WorldWideScience

Sample records for risk assessment technical

  1. Methodology for technical risk assessment

    International Nuclear Information System (INIS)

    Waganer, L.M.; Zuckerman, D.S.

    1983-01-01

    A methodology has been developed for and applied to the assessment of the technical risks associated with an evolving technology. This methodology, originally developed for fusion by K. W. Billman and F. R. Scott at EPRI, has been applied to assess the technical risk of a fuel system for a fusion reactor. Technical risk is defined as the risk that a particular technology or component which is currently under development will not achieve a set of required technical specifications (i.e. probability of failure). The individual steps in the technical risk assessment are summarized. The first step in this methodology is to clearly and completely quantify the technical requirements for the particular system being examined. The next step is to identify and define subsystems and various options which appear capable of achieving the required technical performance. The subsystem options are then characterized regarding subsystem functions, interface requirements with the subsystems and systems, important components, developmental obstacles and technical limitations. Key technical subsystem performance parameters are identified which directly or indirectly relate to the system technical specifications. Past, existing and future technical performance data from subsystem experts are obtained by using a Bayesian Interrogation technique. The input data is solicited in the form of probability functions. Thus the output performance of the system is expressed as probability functions

  2. Feasibility assessment of a risk-based approach to technical specifications

    International Nuclear Information System (INIS)

    Atefi, B.; Gallagher, D.W.

    1991-05-01

    The first phase of the assessment concentrates on (1) identification of selected risk-based approaches for improving current technical specifications, (2) appraisal of characteristics of each approach, including advantages and disadvantages, and (3) recommendation of one or more approaches that might result in improving current technical specification requirements. The second phase of the work concentrates on assessment of the feasibility of implementation of a pilot program to study detailed characteristics of the preferred approach. The real time risk-based approach was identified as the preferred approach to technical specifications for controlling plant operational risk. There do not appear to be any technical or institutional obstacles to prevent initiation of a pilot program to assess the characteristics and effectiveness of such an approach. 2 tabs

  3. Feasibility assessment of a risk-based approach to technical specifications

    International Nuclear Information System (INIS)

    Atefi, B.; Gallagher, D.W.

    1991-05-01

    To assess the potential use of risk and reliability techniques for improving the effectiveness of the technical specifications to control plant operational risk, the Technical Specifications Branch of the Nuclear Regulatory Commission initiated an effort to identify and evaluate alternative risk-based approaches that could bring greater risk perspective to these requirements. In the first phase four alternative approaches were identified and their characteristics were analyzed. Among these, the risk-based approach to technical specifications is the most promising approach for controlling plant operational risk using technical specifications. The second phase of the study concentrated on detailed characteristics of the real time risk-based approach. It is concluded that a real time risk-based approach to technical specifications has the potential to improve both plant safety and availability. 33 figs., 5 figs., 6 tabs

  4. Impact of shutdown risk on risk-based assessment of technical specifications

    International Nuclear Information System (INIS)

    Deriot, S.

    1992-10-01

    This paper describes the current work performed by the Research and Development Division of EDF concerning risk-based assessment of Operating Technical Specifications (OTS). The current risk-based assessment of OTS at EDF is presented. Then, the level 1 Probabilistic Safety Assessment of unit 3 of the Paluel nuclear power station (called PSA 1300) is described. It is fully computerized and takes into account the risk in shutdown states. A case study is presented. It shows that the fact of considering shutdown risk suggests that the current OTS should be modified

  5. Assessment of technical risks

    Energy Technology Data Exchange (ETDEWEB)

    Jaeger, T A [Bundesanstalt fuer Materialpruefung, Berlin (Germany, F.R.)

    1978-01-01

    The safety of technical systems is so difficult to assess because the concept 'risk' contains technical-scientific factors as well as components of individual and social psychology. Immediate or short-term hazards of human life as i.e. caused by the operation of industrial plants and mediate and thus long-term hazards have to be distinguished. Characteristic for the second hazard groups is the great time-lag before the effect takes place. Thus a causal relationship can be recognized only late and not definitely. Even when the causes have been obviated the effects still show. The development of a systems-analytical model as a basis of decisive processes for the introduction of highly endangered large-scale technologies seems particularly difficult. A starting point for the quantification of the risk can still be seen in the product of the probability of realization and the extent of the damage. Public opinion, however, does not base its evaluations on an objective concept of risk but tends to have an attitude of aversion against great and disastrous accidents. On the other hand, plenty of slight accidents are accepted much more easily, even when the amount of deadly victims from accidents reaches dimensions beyond those of the rare large-scale accidents. Here, mostly the damage possible but not the probability of its occurence is seen, let alone the general use of the new technology. The value of the mathematical models for estimating risks is mainly due to the fact that they are able to clear up decisions.

  6. The assessment of technical risks

    International Nuclear Information System (INIS)

    Jaeger, T.A.

    1978-01-01

    The safety of technical systems is so difficult to assess because the concept 'risk' contains technical-scientific factors as well as components of individual and social psychology. Immediate or short-term hazards of human life as i.e. caused by the operation of industrial plants and mediate and thus long-term hazards have to be distinguished. Characteristic for the second hazard groups is the great time-lag before the effect takes place. Thus a causal relationship can be recognized only late and not definitely. Even when the causes have been obviated the effects still show. The development of a systems-analytical model as a basis of decisive processes for the introduction of highly endangered large-scale technologies seems particularly difficult. A starting point for the quantification of the risk can still be seen in the product of the probability of realization and the extent of the damage. Public opinion, however, does not base its evaluations on an objective concept of risk but tends to have an attitude of aversion against great and disastrous accidents. On the other hand, plenty of slight accidents are accepted much more easily, even when the amount of deadly victims from accidents reaches dimensions beyond those of the rare large-scale accidents. Here, mostly the damage possible but not the probability of its occurence is seen, let alone the general use of the new technology. The value of the mathematical models for estimating risks is mainly due to the fact that they are able to clear up decisions. (orig./HP) [de

  7. Tool-based Risk Assessment of Cloud Infrastructures as Socio-Technical Systems

    DEFF Research Database (Denmark)

    Nidd, Michael; Ivanova, Marieta Georgieva; Probst, Christian W.

    2015-01-01

    Assessing risk in cloud infrastructures is difficult. Typical cloud infrastructures contain potentially thousands of nodes that are highly interconnected and dynamic. Another important component is the set of human actors who get access to data and computing infrastructure. The cloud infrastructure...... exercise for cloud infrastructures using the socio-technical model developed in the TRESPASS project; after showing how to model typical components of a cloud infrastructure, we show how attacks are identified on this model and discuss their connection to risk assessment. The technical part of the model...... is extracted automatically from the configuration of the cloud infrastructure, which is especially important for systems so dynamic and complex....

  8. Assessment of technical risks and R and D requirements for a magnetic confinement fusion fuel system. Final report

    International Nuclear Information System (INIS)

    DeFreece, D.A.

    1983-11-01

    This report documents a specific use and results of a novel technique for assessing the technical risks associated with the hardware development of a possible future commercial fusion power plant fuel system. Technical risk is defined as the risk that a particular technology or component which is currently under development will not achieve a set of required technical specifications. A technical risk assessment is the quantification of this risk. This Technical Risk Assessment (TRA) methodology was applied to a deuterium-tritium fuel system for a magnetic-confinement fusion power plant. The fuel system is defined to support a generic commercial reactor with at least two viable options for each critical subsystem. Each subsystem option is defined in detail including nominal performance requirements and subsystem interfaces. Subsystem experts were canvassed to obtain values for past, present and future technical performance parameters for each of the subsystem options. These forecasts are presented as probabilities of achieving given levels of performance in specific time periods for assumed funding scenarios. Several funding scenarios were examined to discern whether performance limitations are caused by funding or technology. A computerized Fuel System simulation is described which uses these subsystem performance parameter forecasts as inputs

  9. Risk management through dynamic technical specifications

    International Nuclear Information System (INIS)

    Klopp, George T.; Petersen, Thomas A.

    2004-01-01

    The wide deployment of plant specific probabilistic risk assessments for nuclear power plants has provided the means to effect a fresh risk management perspective and a fresh, risk based, regulatory outlook on nuclear power. There has been a great deal of conversation on risk based regulation within the U. S. nuclear power industry but, curiously, very little on effective risk management. This paper proposes a means to link the two subjects through the plant Technical Specifications. A revised concept for Technical Specifications is suggested which is based on deterministic analyses and probabilistic risk assessments for each plant. The revised Technical Specifications would consider, on a real-time basis, the exact state of the plant in terms of the status of key components and systems. It would depict current plant risk levels and compare those levels to the desired and limiting (alert/action) levels. It would advise the plant operator on the risk impact of proposed actions through a simple query system and illustrate the impact of such actions on plant status relative to designated risk values. The basis for the proposed approach lies in realistic deterministic plant analyses and probabilistic risk assessment (PRA) deployment tools being developed, in parallel, by a number of parties in the U.S. today. These PRAs are based primarily on the existing plant responses to Generic Letter 88-20, 'Individual Plant Examinations' (IPEs). Each of these tools allows the plant operator to input, on a real-time basis, the status of key equipment and systems. The tools then provide explicit illustrations of dependency effects; updated, 'real-time' risk status indications such as core damage frequency; and, in some cases, allow the operator to assess the risk impact of removing from service selected components for maintenance or testing. These systems generally operate on personal computers and provide nearly instantaneous responses to plant queries. Moving from these tools to

  10. Technical challenges in the qualitative ecological risk assessments performed on the Hanford Site operable units

    International Nuclear Information System (INIS)

    Probasco, K.M.

    1994-01-01

    Qualitative Risk Assessments (QRAS) have been selected as the method for providing the risk-driver indications for interim, remedial, and cleanup actions for the Hanford Site operable units' ecological risk assessments. This expedited response action path has been developed for the Hanford Site to facilitate time-critical decisions and generate immediate emergency cleanup actions. Tight budgets and aggressive time schedules are a major factor in the development of the QRA process. The QRA is a quick way to find immediate threats and a good precursor to a full risk assessment. However, numerous technical challenges have been identified with the QRA approach. The QRA approach differs from a baseline risk assessment in several ways. The main differences involve the use of data that have previously been gathered from the site, and the development of a ''bias-for-action'' document that would reveal qualitative risks from the contaminants identified at the operable units. Technical challenges concerning the ecological portion of these QRAs have raised questions about using the ORA for decision-making and may have weakened the validity of its use in the established procedural framework. Challenges involving such issues as the extrapolation of the contaminant data, data validation and screening techniques, receptor selections, and the final risk characterization outcome threaten the feasibility of the QRA as a decision-making tool. This discussion provides insight into resolving technical challenges and may be a ''lessons-learned'' device for those interested in the QRA approach. Ultimately, these challenges are proving to be learning tools for scientists, regulators, and ecologists and are identifying the data gaps and research direction for future ecological baseline risk assessments

  11. Challenges in Risk Assessment: Quantitative Risk Assessment

    OpenAIRE

    Jacxsens, Liesbeth; Uyttendaele, Mieke; De Meulenaer, Bruno

    2016-01-01

    The process of risk analysis consists out of three components, risk assessment, risk management and risk communication. These components are internationally well spread by Codex Alimentarius Commission as being the basis for setting science based standards, criteria on food safety hazards, e.g. setting maximum limits of mycotoxins in foodstuffs. However, the technical component risk assessment is hard to elaborate and to understand. Key in a risk assessment is the translation of biological or...

  12. Risk assessments for mixtures: technical methods commonly used in the United States

    Science.gov (United States)

    A brief (20 minute) talk on the technical approaches used by EPA and other US agencies to assess risks posed by combined exposures to one or more chemicals. The talk systemically reviews the methodologies (whole-mixtures and component-based approaches) that are or have been used ...

  13. Concept of risk: risk assessment and nuclear safety

    International Nuclear Information System (INIS)

    Thompson, P.B.

    1980-01-01

    The dissertation is a critical examination of risk assessment and its role in public policy. Nuclear power safety safety issues are selected as the primary source of illustrations and examples. The dissertation examines how risk assessment studies develop a concept of risk which becomes decisive for policy choices. Risk-assessment techniques are interpreted as instruments which secure an evaluation of risk which, in turn, figures prominently in technical reports on nuclear power. The philosophical critique is mounted on two levels. First, an epistemological critique surveys distinctions between the technical concept of risk and more familiar senses of risk. The critique shows that utilization of risk assessment re-structures the concept of risk. The technical concept is contrasted to the function of risk within a decision-maker's conceptual agenda and hierarchy of values. Second, an ethical critique exposes the value commitments of risk assessment recommendations. Although some of these values might be defended for policy decisions, the technical character of risk assessment obfuscates normative issues. Risk assessment is shown to be a form of factual enquiry which, nonetheless, represents a commitment to a specific selection of ethical and social values. Risk assessment should not be interpreted as a primary guide to decision unless the specific values incorporated into its concept of risk are stated explicitly and justified philosophically. Such a statement would allow value questions which have been sublimated by the factual tone of the analytic techniques to be debated on clear, social and ethical grounds

  14. Social risk assessment of large technical systems

    NARCIS (Netherlands)

    Pasman, H.J.; Vrijling, J.K.

    2003-01-01

    A probabilistic approach to engineering advances. Since risk adhering to a technical structure can be determined quantitatively easier and more accurately than before, criteria for decision making are becoming more important. If the structure is in the public domain, and benefits are not felt, the

  15. Ethical dimensions in assessing technical risks

    International Nuclear Information System (INIS)

    Birnbacher, D.

    1991-01-01

    Contrary to the present tendency of partially impact-independent technology assessment, the author does not see a difference between a risk-benefit analysis and an ethical technology assessment. As long as the risk-benefit analysis is truly comprehensive, both fall together. This does not mean that convictions of those who have their doubts about some new technologies, independently of impact assessments, may be disregarded in purely consequential risk evaluations. On the contrary, qualms of representatives of these principles, just as any other stable non-acceptance, have to be included as aggravating negative elements in technology assessments. (orig./HSCH) [de

  16. Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

    International Nuclear Information System (INIS)

    Vierow, Karen; Aldemir, Tunc

    2009-01-01

    The project entitled, 'Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors', was conducted as a DOE NERI project collaboration between Texas A and M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

  17. Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Vierow, Karen; Aldemir, Tunc

    2009-09-10

    The project entitled, “Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors”, was conducted as a DOE NERI project collaboration between Texas A&M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

  18. Risk assessment analysis of the future technical unit dedicated to the evaluation and treatment of motor disabilities.

    Science.gov (United States)

    Grelier, S; Thetio, M; Quentin, V; Achache, V; Sanchez, N; Leroux, V; Durand, E; Pequignot, R

    2011-03-01

    The National Hospital of Saint Maurice (HNSM) for Physical Medicine and Rehabilitation aims at strengthening its position as a pivot rehabilitation and physical therapy center. The opening in 2011 of a new unit for the evaluation and treatment of motor disabilities meets this objective. This project includes several parts: clinical, financial, architectural, organizational, applied clinical research as well as dealing with medical equipments and information system. This study focuses on the risk assessment of this future technical unit. This study was conducted by a group of professionals working for the hospital. It started with the design of a functional model to better comprehend the system to be analyzed. Risk assessment consists in confronting this functional model to a list of dangers in order to determine the vulnerable areas of the system. Then the team designed some scenarios to identify the causes, securities barriers and consequences in order to rank the risks. The analysis targeted various dangers, e.g. political, strategic, financial, economical, marketing, clinical and operational. The team identified more than 70 risky scenarios. For 75% of them the criticality level was deemed initially tolerable and under control or unacceptable. The implementation of an action plan for reducing the level of risks before opening this technical unit brought the system down to an acceptable level at 66%. A year prior to opening this technical unit for the evaluation and treatment of motor disabilities, conducting this preliminary risk assessment, with its exhaustive and rigorous methodology, enabled the concerned professionals to work together around an action plan for reducing the risks. 2011 Elsevier Masson SAS. All rights reserved.

  19. Case studies: Risk-based analysis of technical specifications

    International Nuclear Information System (INIS)

    Wagner, D.P.; Minton, L.A.; Gaertner, J.P.

    1987-01-01

    The SOCRATES computer program uses the results of a Probabilistic Risk Assessment (PRA) or a system level risk analysis to calculate changes in risk due to changes in the surveillance test interval and/or the allowed outage time stated in the technical specification. The computer program can accommodate various testing strategies (such as staggered or simultaneous testing) to allow modeling of component testing as it is carried out at a plant. The methods and computer program are an integral part of a larger decision process aimed at determining benefits from technical specification changes. These benefits can include cost savings to the utilities by reducing forced shutdowns with no adverse impacts on risk. Three summaries of case study applications are included to demonstrate the types of results that can be achieved through risk-based evaluation of technical specifications. (orig.)

  20. Advanced Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) Technical Exchange Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Curtis [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-09-01

    During FY13, the INL developed an advanced SMR PRA framework which has been described in the report Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) Detailed Technical Framework Specification, INL/EXT-13-28974 (April 2013). In this framework, the various areas are considered: Probabilistic models to provide information specific to advanced SMRs Representation of specific SMR design issues such as having co-located modules and passive safety features Use of modern open-source and readily available analysis methods Internal and external events resulting in impacts to safety All-hazards considerations Methods to support the identification of design vulnerabilities Mechanistic and probabilistic data needs to support modeling and tools In order to describe this framework more fully and obtain feedback on the proposed approaches, the INL hosted a technical exchange meeting during August 2013. This report describes the outcomes of that meeting.

  1. Probabilistic risk assessment for the Sandia National Laboratories Technical Area V Liquid Waste Disposal System surface impoundments

    International Nuclear Information System (INIS)

    Dawson, L.A.; Eidson, A.F.

    1996-01-01

    A probabilistic risk assessment was completed for a former radioactive waste disposal site. The site, two unlined surface impoundment, was designed as part of the Liquid Waste Disposal System (LWDS) to receive radioactive effluent from nuclear reactors in Technical Area-V (TA-V) at Sandia National Laboratories/New Mexico (SNL/NM). First, a statistical comparison of site sampling results to natural background, using EPA methods, and a spatial distribution analysis were performed. Risk assessment was conducted with SNL/NM's Probabilistic Risk Evaluation and Characterization Investigation System model. The risk assessment indicated that contamination from several constituents might have been high enough to require remediation. However, further analysis based on expected site closure activities and recent EPA guidance indicated that No Further Action was acceptable

  2. Hybrid causal methodology and software platform for probabilistic risk assessment and safety monitoring of socio-technical systems

    Energy Technology Data Exchange (ETDEWEB)

    Groth, Katrina, E-mail: kgroth@umd.ed [Center for Risk and Reliability, 0151 Glenn L. Martin Hall, University of Maryland, College Park, MD 20742 (United States); Wang Chengdong; Mosleh, Ali [Center for Risk and Reliability, 0151 Glenn L. Martin Hall, University of Maryland, College Park, MD 20742 (United States)

    2010-12-15

    This paper introduces an integrated framework and software platform for probabilistic risk assessment (PRA) and safety monitoring of complex socio-technical systems. An overview of the three-layer hybrid causal logic (HCL) modeling approach and corresponding algorithms, implemented in the Trilith software platform, are provided. The HCL approach enhances typical PRA methods by quantitatively including the influence of soft causal factors introduced by human and organizational aspects of a system. The framework allows different modeling techniques to be used for different aspects of the socio-technical system. The HCL approach combines the power of traditional event sequence diagram (ESD)event tree (ET) and fault tree (FT) techniques for modeling deterministic causal paths, with the flexibility of Bayesian belief networks for modeling non-deterministic cause-effect relationships among system elements (suitable for modeling human and organizational influences). Trilith enables analysts to construct HCL models and perform quantitative risk assessment and management of complex systems. The risk management capabilities included are HCL-based risk importance measures, hazard identification and ranking, precursor analysis, safety indicator monitoring, and root cause analysis. This paper describes the capabilities of the Trilith platform and power of the HCL algorithm by use of example risk models for a type of aviation accident (aircraft taking off from the wrong runway).

  3. Hybrid causal methodology and software platform for probabilistic risk assessment and safety monitoring of socio-technical systems

    International Nuclear Information System (INIS)

    Groth, Katrina; Wang Chengdong; Mosleh, Ali

    2010-01-01

    This paper introduces an integrated framework and software platform for probabilistic risk assessment (PRA) and safety monitoring of complex socio-technical systems. An overview of the three-layer hybrid causal logic (HCL) modeling approach and corresponding algorithms, implemented in the Trilith software platform, are provided. The HCL approach enhances typical PRA methods by quantitatively including the influence of soft causal factors introduced by human and organizational aspects of a system. The framework allows different modeling techniques to be used for different aspects of the socio-technical system. The HCL approach combines the power of traditional event sequence diagram (ESD)event tree (ET) and fault tree (FT) techniques for modeling deterministic causal paths, with the flexibility of Bayesian belief networks for modeling non-deterministic cause-effect relationships among system elements (suitable for modeling human and organizational influences). Trilith enables analysts to construct HCL models and perform quantitative risk assessment and management of complex systems. The risk management capabilities included are HCL-based risk importance measures, hazard identification and ranking, precursor analysis, safety indicator monitoring, and root cause analysis. This paper describes the capabilities of the Trilith platform and power of the HCL algorithm by use of example risk models for a type of aviation accident (aircraft taking off from the wrong runway).

  4. Probabilistic risk assessment as an aid to risk management

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1982-01-01

    Probabilistic risk assessments are providing important insights into nuclear power plant safety. Their value is two-fold: first as a means of quantifying nuclear plant risk including contributors to risk, and second as an aid to risk management. A risk assessment provides an analytical plant model that can be the basis for performing meaningful decision analyses for controlling safety. It is the aspect of quantitative risk management that makes probabilistic risk assessment an important technical discipline of the future

  5. Methodology for risk-based analysis of technical specifications

    International Nuclear Information System (INIS)

    Vesely, W.E.; Gaertner, J.P.; Wagner, D.P.

    1985-01-01

    Part of the effort by EPRI to apply probabilistic risk assessment methods and results to the solution of utility problems involves the investigation of methods for risk-based analysis of technical specifications. The culmination of this investigation is the SOCRATES computer code developed by Battelle's Columbus Laboratories to assist in the evaluation of technical specifications of nuclear power plants. The program is designed to use information found in PRAs to re-evaluate risk for changes in component allowed outage times (AOTs) and surveillance test intervals (STIs). The SOCRATES program is a unique and important tool for technical specification evaluations. The detailed component unavailability model allows a detailed analysis of AOT and STI contributions to risk. Explicit equations allow fast and inexpensive calculations. Because the code is designed to accept ranges of parameters and to save results of calculations that do not change during the analysis, sensitivity studies are efficiently performed and results are clearly displayed

  6. Ethical aspects of the assessment of technical risks

    International Nuclear Information System (INIS)

    Birnbacher, D.

    1991-01-01

    When technology assessment goes over into technology politics, then questions arise which can only be answered in an ethical way. Questions like, which risk strategy has to be the basis for decision-making, and is a decision for or against the development, introduction or maintenance of a certain technology to be based at all on risk assessments? The author considers pure consequentialistic ethics the most plausible option, and does not see a basic difference in a risk-benefit analysis and ethical technology assessment. (DG) [de

  7. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  8. Laboratory Biosafety and Biosecurity Risk Assessment Technical Guidance Document

    Energy Technology Data Exchange (ETDEWEB)

    Astuto-Gribble, Lisa M; Caskey, Susan Adele

    2014-07-01

    The purpose of this document is threefold: 1) to describe the laboratory bio safety and biosecurity risk assessment process and its conceptual framework; 2) provide detailed guidance and suggested methodologies on how to conduct a risk assessment; and 3) present some practical risk assessment process strategies using realistic laboratory scenarios.

  9. An Assessment of Technical and Production Risks of Candidate Low-Cost Attitude/Heading Reference Systems(AHRS)

    Science.gov (United States)

    Yuchnovicz, Daniel; Burgess, Malcolm; Hammers, William

    1999-01-01

    This report provides an assessment of technical and production risks of candidate low-cost attitude/heading reference systems (AHRS) for use in the Advanced General Aviation Transport Experiments (AGATE) airplanes. A low-cost AHRS is a key component of modem "glass cockpit" flight displays for General Aviation (GA) aircraft. The technical capabilities of several candidate low-cost AHRS were examined and described along with the technical issues involved with using all solid-state components for attitude measurement. An economic model was developed which describes the expected profit, rate of return, and volume requirements for the manufacture of low-cost AHRS for GA aircraft in the 2000 to 2020 time frame. The model is the result of interviews with GA airframe manufacturers, avionics manufacturers and historical analysis of avionics of similar complexity. The model shows that a manufacturer will break even after three years of AHRS production, realizing an 18 percent rate of return (23 percent profit) on an investment of $3.5M over the 20 year period. A start-up production estimate showed costs of $6-12M for a new company to build and certify an AHRS from scratch, considered to be a high-risk proposition, versus $0.25-0.75M for an experienced avionics manufacturer to manufacture a design under license, a low-risk proposition.

  10. GAR Global Risk Assessment

    Science.gov (United States)

    Maskrey, Andrew; Safaie, Sahar

    2015-04-01

    Disaster risk management strategies, policies and actions need to be based on evidence of current disaster loss and risk patterns, past trends and future projections, and underlying risk factors. Faced with competing demands for resources, at any level it is only possible to priorities a range of disaster risk management strategies and investments with adequate understanding of realised losses, current and future risk levels and impacts on economic growth and social wellbeing as well as cost and impact of the strategy. The mapping and understanding of the global risk landscape has been greatly enhanced by the latest iteration of the GAR Global Risk Assessment and the objective of this submission is to present the GAR global risk assessment which contributed to Global Assessment Report (GAR) 2015. This initiative which has been led by UNISDR, was conducted by a consortium of technical institutions from around the world and has covered earthquake, cyclone, riverine flood, and tsunami probabilistic risk for all countries of the world. In addition, the risks associated with volcanic ash in the Asia-Pacific region, drought in various countries in sub-Saharan Africa and climate change in a number of countries have been calculated. The presentation will share thee results as well as the experience including the challenges faced in technical elements as well as the process and recommendations for the future of such endeavour.

  11. Risk-based analysis methods applied to nuclear power plant technical specifications

    International Nuclear Information System (INIS)

    Wagner, D.P.; Minton, L.A.; Gaertner, J.P.

    1989-01-01

    A computer-aided methodology and practical applications of risk-based evaluation of technical specifications are described. The methodology, developed for use by the utility industry, is a part of the overall process of improving nuclear power plant technical specifications. The SOCRATES computer program uses the results of a probabilistic risk assessment or a system-level risk analysis to calculate changes in risk due to changes in the surveillance test interval and/or the allowed outage time stated in the technical specification. The computer program can accommodate various testing strategies (such as staggered or simultaneous testing) to allow modeling of component testing as it is carried out at the plant. The methods and computer program are an integral part of a larger decision process aimed at determining benefits from technical specification changes. These benefits can include cost savings to the utilities by reducing forced shutdowns and decreasing labor requirements for test and maintenance activities, with no adverse impacts on risk. The methodology and the SOCRATES computer program have been used extensively toe valuate several actual technical specifications in case studies demonstrating the methods. Summaries of these applications demonstrate the types of results achieved and the usefulness of the risk-based evaluation in improving the technical specifications

  12. Risk management: integration of social and technical risk variables into safety assessments of LWR'S

    International Nuclear Information System (INIS)

    Turnage, J.J.; Husseiny, A.A.

    1980-01-01

    A risk management methodology is developed here to formalize the acceptability levels of commercial LWR power plants via the estimation of risk levels acceptable to the public and the integration of such estimates into risk-benefit analysis. Utility theory is used for developing preference models based on value trade-offs among multiple objectives and uncertainties about the impact of alternatives. The method involves reducing the various variables affecting safety acceptability decisions to a single function that provides a metric for acceptability levels. The function accomondates for technical criteria related to design and licensing decisions, as well as public reactions to certain choices

  13. Risk based technique for improving technical specifications

    International Nuclear Information System (INIS)

    Kim, I. S.; Jae, M. S.; Kim, B. S.; Hwang, S. W.; Kang, K. M.; Park, S. S.; Yu, Y. S.

    2001-03-01

    The objective of this study is to develop the systematic guidance for reviewing the documents associated with the changes of technical specifications. The work done in this fiscal year is the following : surveys in TS requirements, TS improvements and TS regulations in foreign countries as well as Korea, surveys on the state-of-the-art of RITSs and their use in Korea, development of a decision-making framework for both the licensee and the regulation agency, description of risk measures, assessment methodology on STI/AOT, and adverse effects caused by periodic maintenance, which are explained in appendix. The results of this study might contribute to enhancing the quality of the current technical specifications and contribute to preparing the risk informed regulation program using the decision-making framework developed in this study

  14. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  15. Overview of risk assessment

    International Nuclear Information System (INIS)

    Rimington, J.D.

    1992-01-01

    The paper begins by defining some terms, and then refer to a number of technical and other difficulties. Finally it attempts to set out why risk assessment is important and what its purposes are. 2) First, risk and risk assessment - what are they?. 3) Risk is a subject of universal significance. Life is very uncertain, and we can achieve no object or benefit in it except by approaching nearer to particular hazards which lie between us and our objects. That approach represents acceptance of risk. 4) Risk assessment is a way of systematising our approach to hazard with a view to determining what is more and what is less risky. It helps us in the end to diminish our exposure while obtaining whatever benefits we have in mind, or to optimise the risks and the benefits

  16. Overview of risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Rimington, J D [Health and Safety Executive (United Kingdom)

    1992-07-01

    The paper begins by defining some terms, and then refer to a number of technical and other difficulties. Finally it attempts to set out why risk assessment is important and what its purposes are. 2) First, risk and risk assessment - what are they?. 3) Risk is a subject of universal significance. Life is very uncertain, and we can achieve no object or benefit in it except by approaching nearer to particular hazards which lie between us and our objects. That approach represents acceptance of risk. 4) Risk assessment is a way of systematising our approach to hazard with a view to determining what is more and what is less risky. It helps us in the end to diminish our exposure while obtaining whatever benefits we have in mind, or to optimise the risks and the benefits.

  17. Excipient Usage Technical Risk Assessment for Generic Solid Dose Products

    Directory of Open Access Journals (Sweden)

    Ajay Babu Pazhayattil

    2017-09-01

    Full Text Available This paper proposes an assessment methodology for solid dose generic small molecule drug products. It addresses the ‘usage of the excipient’ portion of the trinomial by utilizing the systematic approach of Risk Identification, Risk Analysis and Risk Evaluation as per ICH Q9 Quality Risk Management outlined for developing risk control strategies. The assessment and maintenance of excipient risk profile is essential to minimize any potential risk associated to excipients impacting patients.

  18. Implications of probabilistic risk assessment

    International Nuclear Information System (INIS)

    Cullingford, M.C.; Shah, S.M.; Gittus, J.H.

    1987-01-01

    Probabilistic risk assessment (PRA) is an analytical process that quantifies the likelihoods, consequences and associated uncertainties of the potential outcomes of postulated events. Starting with planned or normal operation, probabilistic risk assessment covers a wide range of potential accidents and considers the whole plant and the interactions of systems and human actions. Probabilistic risk assessment can be applied in safety decisions in design, licensing and operation of industrial facilities, particularly nuclear power plants. The proceedings include a review of PRA procedures, methods and technical issues in treating uncertainties, operating and licensing issues and future trends. Risk assessment for specific reactor types or components and specific risks (eg aircraft crashing onto a reactor) are used to illustrate the points raised. All 52 articles are indexed separately. (U.K.)

  19. Model-Driven Information Security Risk Assessment of Socio-Technical Systems

    NARCIS (Netherlands)

    Ionita, Dan

    2018-01-01

    As more aspects of life transition to the digital domain, computer systems become increasingly complex but also more social. But assessing a socio-technical system is no trivial task: it often requires intimate knowledge of the system, awareness of the social dynamics and trust relationships of its

  20. Preliminary risk assessment for nuclear waste disposal in space. Volume I. Executive summary of technical report

    International Nuclear Information System (INIS)

    Rice, E.E.; Denning, R.S.; Friedlander, A.L.

    1982-01-01

    Three major conclusions come from this preliminary risk assessment of nuclear waste disposal in space. Preliminary estimates of space disposal risk are low, even with the estimated uncertainty bounds. If calculated mined geologic repository (MGR) release risks remain low, and the EPA requirements continue to be met, then no additional space disposal study effort is warranted. If risks perceived by the public are significant in the acceptance of mined geologic repositories, then consideration of space disposal as an MGR complement is warranted. As a result of this study, the following recommendations are made to NASA and the US DOE: During the continued evaluation of the mined geologic repository risk over the years ahead by DOE, if any significant increase in the calculated health risk is predicted for the MGR, then space disposal should be reevaluated at that time. The risks perceived by the public for the MGR should be evaluated on a broad basis by an independent organization to evaluate acceptance. If, in the future, MGR risks are found to be significant due to some presently unknown technical or social factor, and space disposal is selected as an alternative that may be useful in mitigating the risks, then the following space disposal study activities are recommended: improvement in chemical processing technology for wastes; payload accident response analysis; risk uncertainty analysis for both MGR and space disposal; health risk modeling that includes pathway and dose estimates; space disposal cost modeling; assessment of space disposal perceived (by public) risk benefit; and space systems analysis supporting risk and cost modeling

  1. A study on decision-making framework for developing risk-informed technical specifications

    International Nuclear Information System (INIS)

    Kim, Beom Seock

    2002-02-01

    The utility and the nuclear research institutes in Korea have conduct research for improving inefficient requirements in technical specifications using the results of probability risk assessments and information associated with risk. However, the guidance for reviewing the improved technical specifications has not been developed. Thus, the objective of this study is to develop a decision-making framework for investigating and reviewing the documents associated with the changes of technical specifications. This work has been done for helping the regulation agency to review the improved technical specifications as well as to make decisions whether the remedy is accepted or not. The contents of this study include: 1. Surveys on Technical Specification regulations in foreign countries as well as those in Korea 2. Surveys on the state- of- the- art methodology for Risk Informed Technical Specifications and their uses in Korea 3. Development of a decision-making framework in both the licensee and the regulation agency position 4. Development and applications of a decision-making framework using Influence Diagrams. The decision-making framework for RITS using Influence Diagrams are developed and applied to an example problem in this study. This work might contribute to developing the risk informed regulation guidance for improving the quality of the current technical specifications

  2. Incorporating organizational factors into Probabilistic Risk Assessment (PRA) of complex socio-technical systems: A hybrid technique formalization

    International Nuclear Information System (INIS)

    Mohaghegh, Zahra; Kazemi, Reza; Mosleh, Ali

    2009-01-01

    This paper is a result of a research with the primary purpose of extending Probabilistic Risk Assessment (PRA) modeling frameworks to include the effects of organizational factors as the deeper, more fundamental causes of accidents and incidents. There have been significant improvements in the sophistication of quantitative methods of safety and risk assessment, but the progress on techniques most suitable for organizational safety risk frameworks has been limited. The focus of this paper is on the choice of 'representational schemes' and 'techniques.' A methodology for selecting appropriate candidate techniques and their integration in the form of a 'hybrid' approach is proposed. Then an example is given through an integration of System Dynamics (SD), Bayesian Belief Network (BBN), Event Sequence Diagram (ESD), and Fault Tree (FT) in order to demonstrate the feasibility and value of hybrid techniques. The proposed hybrid approach integrates deterministic and probabilistic modeling perspectives, and provides a flexible risk management tool for complex socio-technical systems. An application of the hybrid technique is provided in the aviation safety domain, focusing on airline maintenance systems. The example demonstrates how the hybrid method can be used to analyze the dynamic effects of organizational factors on system risk

  3. Nuclear insurance risk assessment using risk-based methodology

    International Nuclear Information System (INIS)

    Wendland, W.G.

    1992-01-01

    This paper presents American Nuclear Insurers' (ANI's) and Mutual Atomic Energy Liability Underwriters' (MAELU's) process and experience for conducting nuclear insurance risk assessments using a risk-based methodology. The process is primarily qualitative and uses traditional insurance risk assessment methods and an approach developed under the auspices of the American Society of Mechanical Engineers (ASME) in which ANI/MAELU is an active sponsor. This process assists ANI's technical resources in identifying where to look for insurance risk in an industry in which insurance exposure tends to be dynamic and nonactuarial. The process is an evolving one that also seeks to minimize the impact on insureds while maintaining a mutually agreeable risk tolerance

  4. Technical Overview of Ecological Risk Assessment - Analysis Phase: Exposure Characterization

    Science.gov (United States)

    Exposure Characterization is the second major component of the analysis phase of a risk assessment. For a pesticide risk assessment, the exposure characterization describes the potential or actual contact of a pesticide with a plant, animal, or media.

  5. Modern biogeochemistry environmental risk assessment

    CERN Document Server

    Bashkin, Vladimir N

    2006-01-01

    Most books deal mainly with various technical aspects of ERA description and calculationsAims at generalizing the modern ideas of both biogeochemical and environmental risk assessment during recent yearsAims at supplementing the existing books by providing a modern understanding of mechanisms that are responsible for the ecological risk for human beings and ecosystem

  6. Building better environmental risk assessments

    Directory of Open Access Journals (Sweden)

    Raymond eLayton

    2015-08-01

    Full Text Available Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERA for genetically modified (GM crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems – examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data, and adapting advances in risk analysis from other relevant disciplines.

  7. Building Better Environmental Risk Assessments

    Science.gov (United States)

    Layton, Raymond; Smith, Joe; Macdonald, Phil; Letchumanan, Ramatha; Keese, Paul; Lema, Martin

    2015-01-01

    Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision-making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERAs) for genetically modified (GM) crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems – examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data), and adapting advances in risk analysis from other relevant disciplines. PMID:26301217

  8. Building Better Environmental Risk Assessments.

    Science.gov (United States)

    Layton, Raymond; Smith, Joe; Macdonald, Phil; Letchumanan, Ramatha; Keese, Paul; Lema, Martin

    2015-01-01

    Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision-making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERAs) for genetically modified (GM) crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems - examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data), and adapting advances in risk analysis from other relevant disciplines.

  9. Incorporating organizational factors into Probabilistic Risk Assessment (PRA) of complex socio-technical systems: A hybrid technique formalization

    Energy Technology Data Exchange (ETDEWEB)

    Mohaghegh, Zahra [Center for Risk and Reliability, University of Maryland, College Park, MD 20742 (United States)], E-mail: mohagheg@umd.edu; Kazemi, Reza; Mosleh, Ali [Center for Risk and Reliability, University of Maryland, College Park, MD 20742 (United States)

    2009-05-15

    This paper is a result of a research with the primary purpose of extending Probabilistic Risk Assessment (PRA) modeling frameworks to include the effects of organizational factors as the deeper, more fundamental causes of accidents and incidents. There have been significant improvements in the sophistication of quantitative methods of safety and risk assessment, but the progress on techniques most suitable for organizational safety risk frameworks has been limited. The focus of this paper is on the choice of 'representational schemes' and 'techniques.' A methodology for selecting appropriate candidate techniques and their integration in the form of a 'hybrid' approach is proposed. Then an example is given through an integration of System Dynamics (SD), Bayesian Belief Network (BBN), Event Sequence Diagram (ESD), and Fault Tree (FT) in order to demonstrate the feasibility and value of hybrid techniques. The proposed hybrid approach integrates deterministic and probabilistic modeling perspectives, and provides a flexible risk management tool for complex socio-technical systems. An application of the hybrid technique is provided in the aviation safety domain, focusing on airline maintenance systems. The example demonstrates how the hybrid method can be used to analyze the dynamic effects of organizational factors on system risk.

  10. Incorporating the Technology Roadmap Uncertainties into the Project Risk Assessment

    International Nuclear Information System (INIS)

    Bonnema, B.E.

    2002-01-01

    This paper describes two methods, Technology Roadmapping and Project Risk Assessment, which were used to identify and manage the technical risks relating to the treatment of sodium bearing waste at the Idaho National Engineering and Environmental Laboratory. The waste treatment technology under consideration was Direct Vitrification. The primary objective of the Technology Roadmap is to identify technical data uncertainties for the technologies involved and to prioritize the testing or development studies to fill the data gaps. Similarly, project management's objective for a multi-million dollar construction project includes managing all the key risks in accordance to DOE O 413.3 - ''Program and Project Management for the Acquisition of Capital Assets.'' In the early stages, the Project Risk Assessment is based upon a qualitative analysis for each risk's probability and consequence. In order to clearly prioritize the work to resolve the technical issues identified in the Technology Roadmap, the issues must be cross- referenced to the project's Risk Assessment. This will enable the project to get the best value for the cost to mitigate the risks

  11. Explaining probalistic risk assessment in common language

    International Nuclear Information System (INIS)

    Wong, J.W.

    1994-01-01

    Probabilistic human health risk assessment is explained in ordinary language using a hypothetical example and the ingestion equation from EPA's Risk Assessment Guidance for Superfund. A section on understanding probabilities and probability distributions used in a Monte Carlo simulation is included as well as an appendix showing the computer run and the technical assumptions behind it

  12. Risk-informed approach in US-APWR technical specifications

    International Nuclear Information System (INIS)

    Saji, Etsuro; Tanaka, Futoshi; Kuroiwa, Katsuya; Kawai, Katsunori

    2009-01-01

    The Risk-Managed Technical Specifications and the Surveillance Frequency Control Program have been adopted in the US-APWR Technical Specifications. These risk-informed approaches are unique among the technical specifications for the advanced light water reactor designs adopted by planned nuclear power stations in the United States. (author)

  13. Risk in technical and scientific studies: general introduction to uncertainty management and the concept of risk

    International Nuclear Information System (INIS)

    Apostolakis, G.E.

    2004-01-01

    George Apostolakis (MIT) presented an introduction to the concept of risk and uncertainty management and their use in technical and scientific studies. He noted that Quantitative Risk Assessment (QRA) provides support to the overall treatment of a system as an integrated socio-technical system. Specifically, QRA aims to answer the questions: - What can go wrong (e.g., accident sequences or scenarios)? - How likely are these sequences or scenarios? - What are the consequences of these sequences or scenarios? The Quantitative Risk Assessment deals with two major types of uncertainty. An assessment requires a 'model of the world', and this preferably would be a deterministic model based on underlying processes. In practice, there are uncertainties in this model of the world relating to variability or randomness that cannot be accounted for directly in a deterministic model and that may require a probabilistic or aleatory model. Both deterministic and aleatory models of the world have assumptions and parameters, and there are 'state-of-knowledge' or epistemic uncertainties associated with these. Sensitivity studies or eliciting expert opinion can be used to address the uncertainties in assumptions, and the level of confidence in parameter values can be characterised using probability distributions (pdfs). Overall, the distinction between aleatory and epistemic uncertainties is not always clear, and both can be treated mathematically in the same way. Lessons on safety assessments that can be learnt from experience at nuclear power plants are that beliefs about what is important can be wrong if a risk assessment is not performed. Also, precautionary approaches are not always conservative if failure modes are not identified. Nevertheless, it is important to recognize that uncertainties will remain despite a quantitative risk assessment: e.g., is the scenario list complete, are the models accepted as reasonable, and are parameter probability distributions representative of

  14. A socio-technical, probabilistic risk assessment model for surgical site infections in ambulatory surgery centers.

    Science.gov (United States)

    Bish, Ebru K; El-Amine, Hadi; Steighner, Laura A; Slonim, Anthony D

    2014-10-01

    To understand how structural and process elements may affect the risk for surgical site infections (SSIs) in the ambulatory surgery center (ASC) environment, the researchers employed a tool known as socio-technical probabilistic risk assessment (ST-PRA). ST-PRA is particularly helpful for estimating risks in outcomes that are very rare, such as the risk of SSI in ASCs. Study objectives were to (1) identify the risk factors associated with SSIs resulting from procedures performed at ASCs and (2) design an intervention to mitigate the likelihood of SSIs for the most common risk factors that were identified by the ST-PRA for a particular surgical procedure. ST-PRA was used to study the SSI risk in the ASC setting. Both quantitative and qualitative data sources were utilized, and sensitivity analysis was performed to ensure the robustness of the results. The event entitled "fail to protect the patient effectively" accounted for 51.9% of SSIs in the ambulatory care setting. Critical components of this event included several failure risk points related to skin preparation, antibiotic administration, staff training, proper response to glove punctures during surgery, and adherence to surgical preparation rules related to the wearing of jewelry, watches, and artificial nails. Assuming a 75% reduction in noncompliance on any combination of 2 of these 5 components, the risk for an SSI decreased from 0.0044 to between 0.0027 and 0.0035. An intervention that targeted the 5 major components of the major risk point was proposed, and its implications were discussed.

  15. Hanford waste vitrification systems risk assessment

    International Nuclear Information System (INIS)

    Miller, W.C.; Hamilton, D.W.; Holton, L.K.; Bailey, J.W.

    1991-09-01

    A systematic Risk Assessment was performed to identify the technical, regulatory, and programmatic uncertainties and to quantify the risks to the Hanford Site double-shell tank waste vitrification program baseline (as defined in December 1990). Mitigating strategies to reduce the overall program risk were proposed. All major program elements were evaluated, including double-shell tank waste characterization, Tank Farms, retrieval, pretreatment, vitrification, and grouting. Computer-based techniques were used to quantify risks to proceeding with construction of the Hanford Waste Vitrification Plant on the present baseline schedule. Risks to the potential vitrification of single-shell tank wastes and cesium and strontium capsules were also assessed. 62 refs., 38 figs., 26 tabs

  16. Business managers turn to risk assessment

    International Nuclear Information System (INIS)

    Allen, Frank

    1993-01-01

    Risk assessments have evolved to help technical managers in nuclear and other industries to design and operate plant with safety in mind. However, they are now developing into the area of business management. (author)

  17. ILO activities in the field of risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Pinnagoda, C [Occupational Safety and Health Branch, Working Conditions and Environment Department, International Labor Organization, Geneva (Switzerland)

    1992-07-01

    Control of chemical risks has become a matter of increasing concern for the occupational safety and health activities of the ILO. Its chemical safety programme focuses attention on a series of comprehensive measures to promote national level action for effective control of chemical risks aimed at the protection of workers and consequently of the general public. The supply and use of information based on risk assessment for exposure control and the application of practical improvement measures through improved risk management and training continue to receive increasing importance. The important and direct role of employers and workers in the assessment of risks and planning and implementation of workplace improvements is an identified need. Risk assessment is a component of the chemical safety programme of the ILO that places significant emphasis on: the setting of international standards that lay down basic principles in chemical risk assessment and control; national level action to promote coherent policies and programmes on safety in the use of chemicals and prevention of industrial disasters (major hazard control); technical advisory services through the development of guides and training programmes that focus on workplace participatory approaches; collection and dissemination of practical information; and technical co-operation assistance to developing countries.

  18. ILO activities in the field of risk assessment

    International Nuclear Information System (INIS)

    Pinnagoda, C.

    1992-01-01

    Control of chemical risks has become a matter of increasing concern for the occupational safety and health activities of the ILO. Its chemical safety programme focuses attention on a series of comprehensive measures to promote national level action for effective control of chemical risks aimed at the protection of workers and consequently of the general public. The supply and use of information based on risk assessment for exposure control and the application of practical improvement measures through improved risk management and training continue to receive increasing importance. The important and direct role of employers and workers in the assessment of risks and planning and implementation of workplace improvements is an identified need. Risk assessment is a component of the chemical safety programme of the ILO that places significant emphasis on: the setting of international standards that lay down basic principles in chemical risk assessment and control; national level action to promote coherent policies and programmes on safety in the use of chemicals and prevention of industrial disasters (major hazard control); technical advisory services through the development of guides and training programmes that focus on workplace participatory approaches; collection and dissemination of practical information; and technical co-operation assistance to developing countries

  19. TRManager – Technical Risk Manager

    Directory of Open Access Journals (Sweden)

    Mark A. Gregory

    2009-06-01

    Full Text Available This paper presents research into the development of a new information management technique called Technical Risk Manager. Project management involves the use of processes and information management techniques to aid decision making in the pursuit of project success. Project success may be achieved by meeting time, cost or performance criteria. Current project management practices focus on achieving time and cost project success criteria by using three information management techniques developed in the 1950s: Gantt, PERT and Critical Path Method. Technical Risk Manager has been developed to provide an information management technique that may be used to aid project management decision making in the pursuit of achieving the performance project success criteria.

  20. Assessing Students' Technical Skill Attainment

    Science.gov (United States)

    Jorgensen, Haley

    2010-01-01

    The Wisconsin Technical College System (WTCS) is working to comply with the Carl D. Perkins Career and Technical Education Improvement Act of 2006 (Perkins) to ensure that its graduates have mastered the technical skills needed by business and industry. The legislation requires that each state identify and approve program assessment strategies…

  1. Operationalization Of The Professional Risks Assessment Activity

    Science.gov (United States)

    Ivascu, Victoria Larisa; Cirjaliu, Bianca; Draghici, Anca

    2015-07-01

    Professional risks assessment approach (integration of analysis and evaluation processes) is linked with the general concerns of nowadays companies for their employees' health and safety assurances, in the context of organizations sustainable development. The paper presents an approach for the operationalization of the professional risk assessment activity in companies through the implementation and use of the OnRisk platform (this have been tested in some industrial companies). The short presentation of the relevant technical reports and statistics on OSH management at the European Union level underlines the need for the development of a professional risks assessment. Finally, there have been described the designed and developed OnRisk platform as a web platform together with some case studies that have validate the created tool.

  2. A survey of ecological risk assessment at DOE facilities

    International Nuclear Information System (INIS)

    Barnthouse, L.W.; Bascietto, J.; Joseph, T.; Bilyard, G.

    1992-01-01

    The US Department of Energy (DOE) Risk-Based Standards Working Group is studying standard-setting and remedial action based on realistic estimates of human health and ecological risks. Federal and state regulations require DOE to assess ecological risks due to present and past operation of DOE facilities and ecological damage caused by remedial actions. Unfortunately, little technical guidance has been provided by regulatory agencies about how these assessments should be performed or what constitutes an adequate assessment. Active ecological research, environmental characterization, and ecological risk assessment programs are already underway at many locations. Some of these programs were established more than 30 years ago. Because of the strength of its existing programs and the depth of expertise available within the DOE complex, the agency is in a position to lead in developing ecological risk assessment procedures that are fully consistent with the general principles defined by EPA and that will ensure environmentally sound and cost-effective restoration of its sites. As a prelude to guidance development, the working group conducted a survey of ecological risk assessment activities at a subset of major DOE facilities. The survey was intended to (1) identify approaches now being used in ecological risk assessments performed by DOE staff and contractors at each site, (2) record successes and failures of these approaches, (3) identify new technical developments with potential for general application to many DOE facilities, and (4) identify major data needs, data resources, and methodological deficiencies

  3. Hazard waste risk assessment

    International Nuclear Information System (INIS)

    Hawley, K.A.; Napier, B.A.

    1986-01-01

    Pacific Northwest Laboratory continued to provide technical assistance to the Department of Energy (DOE) Office of Operational Safety (OOS) in the area of risk assessment for hazardous and radioactive-mixed waste management. The overall objective is to provide technical assistance to OOS in developing cost-effective risk assessment tools and strategies for bringing DOE facilities into compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA or Superfund) and the Resource Conservation and Recovery Act (RCRA). Major efforts during FY 1985 included (1) completing the modification of the Environmental Protection Agency (EPA) Hazard Ranking System (HRS) and developing training manuals and courses to assist in field office implementation of the modified Hazard Ranking System (mHRS); (2) initiating the development of a system for reviewing field office HRS/mHRS evaluations for appropriate use of data and appropriate application of the methodology; (3) initiating the development of a data base management system to maintain all field office HRS/mHRS scoring sheets and to support the master OOS environmental data base system; (4) developing implementation guidance for Phase I of the DOE CERCLA Program, Installation Assessment; (5) continuing to develop an objective, scientifically based methodology for DOE management to use in establishing priorities for conducting site assessments under Phase II of the DOE CERCLA Program, Confirmation; and (6) participating in developing the DOE response to EPA on the proposed listing of three sites on the National Priorities List

  4. Technical Needs for Enhancing Risk Monitors with Equipment Condition Assessment for Advanced Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Coble, Jamie B.; Coles, Garill A.; Ramuhalli, Pradeep; Meyer, Ryan M.; Berglin, Eric J.; Wootan, David W.; Mitchell, Mark R.

    2013-04-04

    Advanced small modular reactors (aSMRs) can provide the United States with a safe, sustainable, and carbon-neutral energy source. The controllable day-to-day costs of aSMRs are expected to be dominated by operation and maintenance costs. Health and condition assessment coupled with online risk monitors can potentially enhance affordability of aSMRs through optimized operational planning and maintenance scheduling. Currently deployed risk monitors are an extension of probabilistic risk assessment (PRA). For complex engineered systems like nuclear power plants, PRA systematically combines event likelihoods and the probability of failure (POF) of key components, so that when combined with the magnitude of possible adverse consequences to determine risk. Traditional PRA uses population-based POF information to estimate the average plant risk over time. Currently, most nuclear power plants have a PRA that reflects the as-operated, as-modified plant; this model is updated periodically, typically once a year. Risk monitors expand on living PRA by incorporating changes in the day-by-day plant operation and configuration (e.g., changes in equipment availability, operating regime, environmental conditions). However, population-based POF (or population- and time-based POF) is still used to populate fault trees. Health monitoring techniques can be used to establish condition indicators and monitoring capabilities that indicate the component-specific POF at a desired point in time (or over a desired period), which can then be incorporated in the risk monitor to provide a more accurate estimate of the plant risk in different configurations. This is particularly important for active systems, structures, and components (SSCs) proposed for use in aSMR designs. These SSCs may differ significantly from those used in the operating fleet of light-water reactors (or even in LWR-based SMR designs). Additionally, the operating characteristics of aSMRs can present significantly different

  5. Technical specifications review of nuclear power plants: a risk-informed evaluation

    International Nuclear Information System (INIS)

    Saldanha, Pedro Luiz da Cruz; Sousa, Anna Leticia; Frutuoso e Melo, Paulo Fernando Ferreira; Duarte, Juliana Pacheco

    2012-01-01

    The use of risk information by a regulatory body as part of an integrated decision making process addresses the way in which risk information is being used as part of an integrated process in making decisions about safety issues at nuclear plants – commonly referred to as risk-informed decision making. The risk-informed approach aims to integrate in a systematic manner quantitative and qualitative, deterministic and probabilistic safety considerations to obtain a balanced decision. Probabilistic Safety Assessment (PSA) is a methodology that can be applied to provide a structured analysis process to evaluate the frequency and consequences of accidents scenarios in nuclear power plants. Technical Specifications (TS) are specifications regarding the characteristics of nuclear power plants (variables, systems or components) of overriding importance to nuclear safety and radiation protection, which is an integral part of plant operation authorization. Limiting Conditions of Operation (LCO) are the minimum levels of performance or capacity or operating system components required for the safe operation of nuclear plants, as defined in technical specifications. The Maintenance Rule (MR) is a requirement established by the U. S. Nuclear Regulatory Commission (NRC) to check the effectiveness of maintenance carried out in nuclear plants, and plant configuration control. The control of plant configuration is necessary to verify the impact of the maintenance of a safety device out of service on plant safety. The Electric Power Research Institute (EPRI) has assessed the role of probabilistic safety analysis in the regulation of nuclear power plants with the following objectives: a) to provide utilities with an approach for developing and implementing nuclear power station risk-managed technical specification programs; and b) to complement and supplement existing successful configuration risk management applications such as MR. This paper focuses on the evaluation of EPRI

  6. Technical Assistance Needs Assessments (TANAs)

    Science.gov (United States)

    The Technical Assistance Needs Assessment (TANA) is a process to identify whether a community requires additional support from EPA in order to understand technical information and have meaningful participation in the Superfund decision-making process.

  7. Advanced Test Reactor outage risk assessment

    International Nuclear Information System (INIS)

    Thatcher, T.A.; Atkinson, S.A.

    1997-01-01

    Beginning in 1997, risk assessment was performed for each Advanced Test Reactor (ATR) outage aiding the coordination of plant configuration and work activities (maintenance, construction projects, etc.) to minimize the risk of reactor fuel damage and to improve defense-in-depth. The risk assessment activities move beyond simply meeting Technical Safety Requirements to increase the awareness of risk sensitive configurations, to focus increased attention on the higher risk activities, and to seek cost-effective design or operational changes that reduce risk. A detailed probabilistic risk assessment (PRA) had been performed to assess the risk of fuel damage during shutdown operations including heavy load handling. This resulted in several design changes to improve safety; however, evaluation of individual outages had not been performed previously and many risk insights were not being utilized in outage planning. The shutdown PRA provided the necessary framework for assessing relative and absolute risk levels and assessing defense-in-depth. Guidelines were written identifying combinations of equipment outages to avoid. Screening criteria were developed for the selection of work activities to receive review. Tabulation of inherent and work-related initiating events and their relative risk level versus plant mode has aided identification of the risk level the scheduled work involves. Preoutage reviews are conducted and post-outage risk assessment is documented to summarize the positive and negative aspects of the outage with regard to risk. The risk for the outage is compared to the risk level that would result from optimal scheduling of the work to be performed and to baseline or average past performance

  8. Risk assessment for biodiversity conservation planning in Pacific Northwest forests

    Science.gov (United States)

    Becky K. Kerns; Alan Ager

    2007-01-01

    Risk assessment can provide a robust strategy for landscape-scale planning challenges associated with species conservation and habitat protection in Pacific Northwest forests. We provide an overview of quantitative and probabilistic ecological risk assessment with focus on the application of approaches and influences from the actuarial, financial, and technical...

  9. Risk assessment of the retrieval of transuranic waste: Pads 1, 2, and 4, Technical Area-54, Area G Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Wilbert, K.A.; Lyon, B.F.; Hutchison, J.; Holmes, J.A.; Legg, J.L.; Simek, M.P.; Travis, C.C.; Wollert, D.A.

    1995-05-01

    The Risk Assessment for the Retrieval of Transuranic Waste is a comparative risk assessment of the potential adverse human health effects resulting from exposure to contaminants during retrieval and post-retrieval aboveground storage operations of post-1970 earthen-covered transuranic waste. Two alternatives are compared: (1) Immediate Retrieval and (2) Delayed Retrieval. Under the Immediate Retrieval Alternative, retrieval of the waste is assumed to begin immediately, Under the Delayed Retrieval Alternative, retrieval is delayed 10 years. The current risk assessment is on Pads 1, 2, and 4, at Technical Area-54, Area-G, Los Alamos National Laboratory (LANL). Risks are assessed independently for three scenarios: (1) incident-free retrieval operations, (2) incident-free storage operations, and (3) a drum failure analysis. The drum failure analysis evaluates container integrity under both alternatives and assesses the impacts of potential drum failures during retrieval operations. Risks associated with a series of drum failures are potentially severe for workers, off-site receptors, and general on-site employees if retrieval is delayed 10 years and administrative and engineering controls remain constant. Under the Delayed Retrieval Alternative, an average of 300 drums out of 16,647 are estimated to fail during retrieval operations due to general corrosion, while minimal drums are predicted to fail under the Immediate Retrieval Alternative. The results of the current study suggest that, based on risk, remediation of Pads 1, 2, and 4 at LANL should not be delayed. Although risks from incident-free operations in the Delayed Retrieval Alternative are low, risks due to corrosion and drum failures are potentially severe

  10. Self vs expert assessment of technical and non-technical skills in high fidelity simulation.

    Science.gov (United States)

    Arora, Sonal; Miskovic, Danilo; Hull, Louise; Moorthy, Krishna; Aggarwal, Rajesh; Johannsson, Helgi; Gautama, Sanjay; Kneebone, Roger; Sevdalis, Nick

    2011-10-01

    Accurate assessment is imperative for learning, feedback and progression. The aim of this study was to examine whether surgeons can accurately self-assess their technical and nontechnical skills compared with expert faculty members' assessments. Twenty-five surgeons performed a laparoscopic cholecystectomy (LC) in a simulated operating room. Technical and nontechnical performance was assessed by participants and faculty members using the validated Objective Structured Assessment of Technical Skills (OSATS) and the Non-Technical Skills for Surgeons scale (NOTSS). Assessment of technical performance correlated between self and faculty members' ratings for experienced (median score, 30.0 vs 31.0; ρ = .831; P = .001) and inexperienced (median score, 22.0 vs 28.0; ρ = .761; P = .003) surgeons. Assessment of nontechnical skills between self and faculty members did not correlate for experienced surgeons (median score, 8.0 vs 10.5; ρ = -.375; P = .229) or their more inexperienced counterparts (median score, 9.0 vs 7.0; ρ = -.018; P = .953). Surgeons can accurately self-assess their technical skills in virtual reality LC. Conversely, formal assessment with faculty members' input is required for nontechnical skills, for which surgeons lack insight into their behaviours. Copyright © 2011 Elsevier Inc. All rights reserved.

  11. Risk-based technical specifications program: Site interview results

    International Nuclear Information System (INIS)

    Andre, G.R.; Baker, A.J.; Johnson, R.L.

    1991-08-01

    The Electric Power Research Institute and Pacific Gas and Electric Company are sponsoring a program directed at improving Technical Specifications using risk-based methods. The major objectives of the program are to develop risk-based approaches to improve Technical Specifications and to develop an Interactive Risk Advisor (IRA) prototype. The IRA is envisioned as an interactive system that is available to plant personnel to assist in controlling plant operation. Use of an IRA is viewed as a method to improve plant availability while maintaining or improving plant safety. In support of the program, interviews were conducted at several PWR and BWR plant sites, to elicit opinions and information concerning risk-based approaches to Technical Specifications and IRA requirements. This report presents the results of these interviews, including the functional requirements of an IRA. 2 refs., 6 figs., 2 tabs

  12. Risk Assessment for an Unmanned Merchant Ship

    Directory of Open Access Journals (Sweden)

    Ø.J. Rødseth

    2015-09-01

    Full Text Available The MUNIN project is doing a feasibility study on an unmanned bulk carrier on an intercontinental voyage. To develop the technical and operational concepts, MUNIN has used a risk-based design method, based on the Formal Safety Analysis method which is also recommended by the International Mari-time Organization. Scenario analysis has been used to identify risks and to simplify operational scope. Systematic hazard identification has been used to find critical safety and security risks and how to address these. Technology and operational concept testing is using a hypothesis-based test method, where the hypotheses have been created as a result of the risk assessment. Finally, the cost-benefit assessment will also use results from the risk assessment. This paper describes the risk assessment method, some of the most important results and also describes how the results have been or will be used in the different parts of the project.

  13. 2011 PERFORMANCE ASSESSMENT COMMUNITY OF PRACTICE TECHNICAL EXCHANGE - SUMMARY

    Energy Technology Data Exchange (ETDEWEB)

    Seitz, R.

    2011-12-30

    The Performance Assessment Community of Practice (PA CoP) was developed in 2008 to improve consistency and quality in the preparation of performance assessments (PAs) and risk assessments across the Department of Energy (DOE) Complex. The term, PA, is used to represent all of these modeling applications in this report. The PA CoP goals are to foster the exchange of information among PA practitioners and to share lessons learned from PAs conducted for DOE, commercial disposal facilities, and international entities. Technical exchanges and workshops are a cornerstone of PA CoP activities. Previous technical exchanges have addressed Engineered Barriers (2009 - http://www.cresp.org/education/workshops/pacop/), the Advanced Simulation Capability for Environmental Management and the Cementitious Barriers Partnership (2010 - http://srnl.doe.gov/copexchange/links.htm). Each technical exchange also includes summary presentations regarding activities at DOE, the Nuclear Regulatory Commission (NRC) and other organizations (e.g., International Atomic Energy Agency (IAEA)) as well as a number of presentations from selected sites to provide insight and perspective from on-going modeling activities. Through the deployment of PA Assistance Teams, the PA CoP has also been engaged in the development of new PAs across the DOE Complex. As a way of improving consistency in the preparation of new PAs, the teams provide technical advice and share experiences, noteworthy practices, and lessons learned from previous Low-Level Waste Disposal Facility Federal Review Group (LFRG) reviews. Teams have provided support for PAs at Hanford, Idaho, Paducah and Portsmouth. The third annual PA CoP Technical Exchange was held on May 25-26, 2011 in Atlanta, GA. The PA CoP Steering Committee Meeting held its first meeting on May 24 prior to the Technical Exchange. Decision making using models and software quality assurance were the topical emphasis for the exchange. A new feature at the 2011 technical

  14. Proposals to overcome limitations in the EU chemical risk assessment scheme

    DEFF Research Database (Denmark)

    Trapp, Stefan; Schwartz, S.

    2000-01-01

    The noti®cation of new chemicals in the European Union requires a risk assessment. A Technical Guidance Document (TGD) was prepared for assistance. The TGD proposes QSARs, regressions and models from various sources. Each method has its own range of applicability and its own restrictions. Regress......The noti®cation of new chemicals in the European Union requires a risk assessment. A Technical Guidance Document (TGD) was prepared for assistance. The TGD proposes QSARs, regressions and models from various sources. Each method has its own range of applicability and its own restrictions...

  15. Guam Initial Technical Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.; Conrad, M.; Haase, S.; Hotchkiss, E.; McNutt, P.

    2011-04-01

    Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conduct future analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

  16. US EPA's Ecological Risk Assessment Support Center ...

    Science.gov (United States)

    BackgroundThe ERASC provides technical information and addresses scientific questions of concern or interest on topics relevant to ecological risk assessment at hazardous waste sites for EPA's Office of Solid Waste and Emergency Response (OSWER) personnel and the Office of Resource Conservation and Recovery (ORCR) staff. Requests are channeled to ERASC through the Ecological Risk Assessment Forum (ERAF). To assess emerging and complex scientific issues that require expert judgment, the ERASC relies on the expertise of scientists and engineers located throughout EPA's Office of Research and Development (ORD) labs and centers.ResponseERASC develops responses that reflect the state of the science for ecological risk assessment and also provides a communication point for the distribution of the responses to other interested parties. For further information, contact Ecology_ERASC@epa.gov or call 513-569-7940.

  17. Risk assessment for transportation of radioactive materials and nuclear explosives

    International Nuclear Information System (INIS)

    Clauss, D.B.; Wilson, R.K.; Hartman, W.F.

    1991-01-01

    Sandia National Laboratories has the lead technical role for probabilistic risk assessments of transportation of nuclear weapons, components, and special nuclear material in support of the US Department of Energy. The emphasis of the risk assessments is on evaluating the probability of inadvertent disposal of radioactive material and the consequences of such a release. This paper will provide an overview of the methodology being developed for the risk assessment and will discuss the interpretation and use of the results. The advantages and disadvantages of using risk assessment as an alternative to performance-based criteria for packaging will be described. 2 refs., 1 fig

  18. Objective assessment of technical skills in surgery

    OpenAIRE

    Moorthy, Krishna; Munz, Yaron; Sarker, Sudip K; Darzi, Ara

    2003-01-01

    In the past few years, considerable developments have been made in the objective assessment of technical proficiency of surgeons. Technical skills should be assessed during training, and various methods have been developed for this purpose

  19. Selection of technical risk responses for efficient contingencies

    Energy Technology Data Exchange (ETDEWEB)

    Kujawski, Edouard

    2002-02-28

    The primary goal of good project risk management should be to successfully deliver projects for the lowest cost at an acceptable level of risk. This requires the systematic development and implementation of a set of Risk Response Actions (RRA) that achieves the lowest total project cost for a given probability of success while meeting technical performance and schedule. We refer to this set as the ''efficient RRA set''. This work presents a practical and mathematically sound approach for determining the efficient RRA set. It builds on some of Markowitz's portfolio selection principles and introduces several conceptual and modeling differences to properly treat project technical risks. The set of RRAs is treated as whole and not just individual risks. The efficient RRA set is determined based on ''Outcome Cost Vs Probability of Success''. The risks and RRAs are characterized using scenarios, decision trees, and cumulative probability distributions. The analysis provides information that enables decision-makers to select the efficient RRA set that explicitly takes their attitude toward project risk into account. Decision-makers should find it both useful and practical for sound decision-making under uncertainty/risk and efficiently optimizing project success. The computations are readily performed using commercially available Monte Carlo simulation tools. The approach is detailed using a realistic but simplified case of a project with two technical risks.

  20. Aspects regarding explosion risk assessment

    Directory of Open Access Journals (Sweden)

    Părăian Mihaela

    2017-01-01

    Full Text Available Explosive risk occurs in all activities involving flammable substances in the form of gases, vapors, mists or dusts which, in mixture with air, can generate an explosive atmosphere. As explosions can cause human losses and huge material damage, the assessment of the explosion risk and the establishment of appropriate measures to reduce it to acceptable levels according to the standards and standards in force is of particular importance for the safety and health of people and goods.There is no yet a recognized method of assessing the explosion risk, but regardless of the applied method, the likelihood of an explosive atmosphere occurrence has to be determined, together with the occurrence of an efficient ignition source and the magnitude of foreseeable consequences. In assessment processes, consequences analysis has a secondary importance since it’s likely that explosions would always involve considerable damage, starting from important material damages and up to human damages that could lead to death.The purpose of the work is to highlight the important principles and elements to be taken into account for a specific risk assessment. An essential element in assessing the risk of explosion in workplaces where explosive atmospheres may occur is technical installations and personal protective equipment (PPE that must be designed, manufactured, installed and maintained so that they cannot generate a source of ignition. Explosion prevention and protection requirements are governed by specific norms and standards, and a main part of the explosion risk assessment is related to the assessment of the compliance of the equipment / installation with these requirements.

  1. Concerning ethical risk assessment

    International Nuclear Information System (INIS)

    Boeckle, F.

    1991-01-01

    After a fundamental consideration of the concept of responsibility and 'long-term responsibility' for late sequelae, the problems of an ehtical assessment of risks were illustrated: The concept of risk itself poses three problems - predicting the probability of occurrence, assessing the damage = subjective classification of the degree of damage, determining whether the advantages outweigh the risks. It is not possible to weigh the advantages and risks against each other without assessing the goals and the priorities which have been set. Here ethics is called for, because it concerns itself with the reasonableness of evaluative decisions. Its task is to enable us to become aware of and comprehend our system of values in all of its complexity in reference to real life. Ethics can only fulfill its task if it helps us to adopt an integral perspective, i.e. if it centers on the human being. 'One must assess all technical and economic innovations in terms of whether they are beneficial to the development of mankind on a long-term basis. They are only to be legitimized insofar as they prove themselves to be a means of liberating mankind and contributing to his sense of dignity and identity, as a means of bringing human beings together and encouraging them to care for one another, and as a means of protecting the natural basis of our existence. (orig./HSCH) [de

  2. Alternative approaches to risk-based technical specifications

    International Nuclear Information System (INIS)

    Atefi, B.; Gallagher, D.W.; Liner, R.T.; Lofgren, E.V.

    1987-01-01

    Four alternative risk-based approaches to Technical Specifications are identified. These are: a Probabilistic Risk Assessment (PRA) oriented approach; a reliability goal-oriented approach; an approach based on configuration control; a data-oriented approach. Based on preliminary results, the PRA-oriented approach, which has been developed further than the other approaches, seems to offer a logical, quantitative basis for setting Allowed Outage Times (AOTs) and Surveillance Test Intervals (STIs) for some plant components and systems. The most attractive feature of this approach is that it directly links the AOTs and STIs with the risk associated with the operation of the plant. This would focus the plant operator's and the regulatory agency's attention on the most risk-significant components of the plant. A series of practical issues related to the level of detail and content of the plant PRAs, requirements for the review of these PRAs, and monitoring cf the plant's performance by the regulatory agency must be resolved before the approach could be implemented. Future efforts will examine the other three approaches and their practicality before firm conclusions are drawn regarding the viability of any of these approaches

  3. Non-technical skills assessment in surgery.

    Science.gov (United States)

    Sharma, Bharat; Mishra, Amit; Aggarwal, Rajesh; Grantcharov, Teodor P

    2011-09-01

    Adverse events in surgery have highlighted the importance of non-technical skills, such as communication, decision-making, teamwork, situational awareness and leadership, to effective organizational performance. These skills carry particular importance to surgical oncology, as members of a multidisciplinary team must work cohesively to formulate effective patient care plans. Several non-technical skills evaluation tools have been developed for use in surgery, without adequate comparison and consensus on which should be standard for training. Eleven articles describing the use of three non-technical evaluation tools related to surgery: NOTSS (Non Technical Skills for Surgeons), NOTECHS (Non Technical Skills) and OTAS (Observational Teamwork Assessment for Surgery) were analyzed with respect to scale formulation, validity, reliability and feasibility. Furthermore, their use in training thus far and the future of non-technical rating scales in surgical curricula was discussed. Future work should focus on incorporating these assessment tools into training and into a real operating room setting to provide formative evaluations for surgical residents. Copyright © 2010 Elsevier Ltd. All rights reserved.

  4. Handbook of methods for risk-based analysis of technical specifications

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Mankamo, T.; Vesely, W.E.

    1996-01-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operations (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements are based on deterministic analyses and engineering judgments. Improvements in these requirements are facilitated by the availability of plant-specific Probabilistic Risk Assessments (PRAs). The US Nuclear Regulatory Commission (USNRC) Office of Research sponsored research to develop systematic, risk-based methods to improve various aspects of TS requirements. A handbook of methods summarizing such risk-based approaches has been completed in 1994. It is expected that this handbook will provide valuable input to NRC's present work in developing guidance for using PRA in risk-informed regulation. The handbook addresses reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), managing plant configurations, and scheduling maintenance

  5. Perspectives and reconciliation of viewpoints on risk assessment issues

    International Nuclear Information System (INIS)

    Smith, C.F.; Cohen, J.J.

    1980-01-01

    It is important to recognize the distinction between risk assessment and its components which include risk analysis, perspectives study, and decision analysis. Divergence of opinion within the scientific community as well as the public at large is a characteristic of issues related to nuclear power. The divergent opinions can largely be characterized as either optimistic or pessimistic in nature. Reconciliation of divergent viewpoints presents some difficult challenges. It is doubtful that issues which have an emotional or philosophical basis can be resolved through technical efforts. Public education on the technical issues might prove helpful

  6. Risk assessment of Short and Medium Chain Chlorinated Paraffin’s (SCCP and MCCP)

    DEFF Research Database (Denmark)

    Christensen, Frans Møller; Olsen, Stig Irving

    2002-01-01

    findings of the Short Chain Chlorinated Paraffin (SCCP) and the draft Medium Chain Chlorinated Paraffin (MCCP) risk assessments. The political actions taken as a consequence of the assessments are also described. The risk assessments have been prepared according to the EU Technical Guidance Document (TGD...

  7. Risk-based configuration control: Application of PSA in improving technical specifications and operational safety

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Vesely, W.E.

    1992-01-01

    Risk-based configuration control is the management of component configurations using a risk perspective to control risk and assure safety. A configuration, as used here, is a set of component operability statuses that define the state of a nuclear power plant. If the component configurations that have high risk implications do not occur, then the risk from the operation of nuclear power plants would be minimal. The control of component configurations, i.e., the management of component statuses, to minimize the risk from components being unavailable, becomes difficult, because the status of a standby safety system component is often not apparent unless it is tested. Controlling plant configuration from a risk-perspective can provide more direct risk control and also more operational flexibility by allowing looser controls in areas unimportant to risk. Risk-based configuration control approaches can be used to replace parts of nuclear power plant Technical Specifications. With the advances in probabilistic safety assessment (PSA) technology, such approaches to improve Technical Specifications and operational safety are feasible. In this paper, we present an analysis of configuration risks, and a framework for risk-based configuration control to achieve the desired control of risk-significant configurations during plant operation

  8. Multicriteria Decision Framework for Cybersecurity Risk Assessment and Management.

    Science.gov (United States)

    Ganin, Alexander A; Quach, Phuoc; Panwar, Mahesh; Collier, Zachary A; Keisler, Jeffrey M; Marchese, Dayton; Linkov, Igor

    2017-09-05

    Risk assessors and managers face many difficult challenges related to novel cyber systems. Among these challenges are the constantly changing nature of cyber systems caused by technical advances, their distribution across the physical, information, and sociocognitive domains, and the complex network structures often including thousands of nodes. Here, we review probabilistic and risk-based decision-making techniques applied to cyber systems and conclude that existing approaches typically do not address all components of the risk assessment triplet (threat, vulnerability, consequence) and lack the ability to integrate across multiple domains of cyber systems to provide guidance for enhancing cybersecurity. We present a decision-analysis-based approach that quantifies threat, vulnerability, and consequences through a set of criteria designed to assess the overall utility of cybersecurity management alternatives. The proposed framework bridges the gap between risk assessment and risk management, allowing an analyst to ensure a structured and transparent process of selecting risk management alternatives. The use of this technique is illustrated for a hypothetical, but realistic, case study exemplifying the process of evaluating and ranking five cybersecurity enhancement strategies. The approach presented does not necessarily eliminate biases and subjectivity necessary for selecting countermeasures, but provides justifiable methods for selecting risk management actions consistent with stakeholder and decisionmaker values and technical data. Published 2017. This article is a U.S. Government work and is in the public domain in the U.S.A.

  9. A Single Conjunction Risk Assessment Metric: the F-Value

    Science.gov (United States)

    Frigm, Ryan Clayton; Newman, Lauri K.

    2009-01-01

    The Conjunction Assessment Team at NASA Goddard Space Flight Center provides conjunction risk assessment for many NASA robotic missions. These risk assessments are based on several figures of merit, such as miss distance, probability of collision, and orbit determination solution quality. However, these individual metrics do not singly capture the overall risk associated with a conjunction, making it difficult for someone without this complete understanding to take action, such as an avoidance maneuver. The goal of this analysis is to introduce a single risk index metric that can easily convey the level of risk without all of the technical details. The proposed index is called the conjunction "F-value." This paper presents the concept of the F-value and the tuning of the metric for use in routine Conjunction Assessment operations.

  10. Risks and risk assessment according to British legislation

    International Nuclear Information System (INIS)

    Vieweg, K.

    1980-01-01

    The most important rules of the large number of legal regulations and other norms relating to risk control of technical installations discussed as far as their approach is quantitative: the regulations of the Health and Safety at Work Act of 1974, of the Factories Act of 1961, the Hazardous Installations (Notification and Survey) Regulation, the Canvey-Island Study, regulations referring to Atomic Energy Law and the administrative practice, legal regulations in the field of navigation, regulations concerning planning legislation including the Windscale-Study. In Great Britain, the power of decision in the field of technical safety has been clearly assigned to the administrative authorities. The legislature refrained from going into details in the stipulation of legal regulations, judicial control has not been provided for, or has only little relevance in practice. The prevailing goal is to reach decisions by consensus, taking every effort to solve conflicts of interest by mutual agreements. Methods and criteria in risk assessment have been modified according to technological knowledge and developments. (orig./HSCH) [de

  11. Technical and Technological Skills Assessment in Laparoscopic Surgery

    Science.gov (United States)

    Chang, Avril; Vincent, Charles

    2006-01-01

    Objectives: Surgical appraisal and revalidation are key components of good surgical practice and training. Assessing technical skills in a structured manner is still not widely used. Laparoscopic surgery also requires the surgeon to be competent in technological aspects of the operation. Methods: Checklists for generic, specific technical, and technological skills for laparoscopic cholecystectomies were constructed. Two surgeons with >12 years postgraduate surgical experience assessed each operation blindly and independently on DVD. The technological skills were assessed in the operating room. Results: One hundred operations were analyzed. Eight trainees and 10 consultant surgeons were recruited. No adverse events occurred due to technical or technological skills. Mean interrater reliability was kappa=0.88, P=technical and technological skills between trainee and consultant surgeons were significant, Mann-Whitney P=technical and technological skills can be measured to assess performance of laparoscopic surgeons. This technical and technological assessment tool for laparoscopic surgery seems to have face, content, concurrent, and construct validities and could be modified and applied to any laparoscopic operation. The tool has the possibility of being used in surgical training and appraisal. We aim to modify and apply this tool to advanced laparoscopic operations. PMID:17212881

  12. Risk, surprises and black swans fundamental ideas and concepts in risk assessment and risk management

    CERN Document Server

    Aven, Terje

    2014-01-01

    Risk, Surprises and Black Swans provides an in depth analysis of the risk concept with a focus on the critical link to knowledge; and the lack of knowledge, that risk and probability judgements are based on.Based on technical scientific research, this book presents a new perspective to help you understand how to assess and manage surprising, extreme events, known as 'Black Swans'. This approach looks beyond the traditional probability-based principles to offer a broader insight into the important aspects of uncertain events and in doing so explores the ways to manage them.

  13. A technical review and assessment of the BEIR V [Biological Effects of Ionizing Radiation V] report

    International Nuclear Information System (INIS)

    1990-03-01

    This report was prepared by the DOE BEIR V Technical Review Committee (TRC) to provide a technical review and assessment of the National Research Council's Bilogical Effects of Ionizing Radiation (BEIR) Committee's Report entitled ''Health Effects of Exposure to Low Levels of Ionizing Radiation'' (BEIR V). This report contains seven sections. The first section serves as an introduction and reviews the charge to the TRC. The second section is a chapter-by- chapter summary of the BEIR V Report. The third section is a summary of the risk estimates and conclusions of the BEIR V Committee for genetic effects, cancer induction, and in utero effects. The fourth section is a summary and analysis of the new scientific information used by the BEIR V Committee in developing its risk recommendations and conclusions. The fifth section is an assessment of the scientific information and methods used by the BEIR V Committee in developing their risk estimates and conclusions and an analysis of the key assumptions underlying the use of these risk estimates in risk assessment. The sixth section is the TRC'S assessment of the regulatory implications of the BEIR V risk estimates and conclusions for DOE nuclear operations. The seventh and final section is the TRC'S recommended actions for DOE's consideration concerning the BEIR V Report risk estimates and conclusions. 23 refs., 5 tabs

  14. Risk assessment concept in the new approach directives and its integration in the Enterprise Risk Management (ERM

    Directory of Open Access Journals (Sweden)

    Đapić Mirko

    2012-03-01

    Full Text Available In the nineties years of the previous century, the European Union achieved, through introducing the New and Global Approach to technical harmonization and standardization, a significant improvement in the approach to conformity assessment of products, by integrating the requirements for technical products safety into the process of its designing. This was achieved by preventive analyzing and quantifying of risk levels in the design process with the objective of determining the scope of the needed safety systems. On the other hand, we have witnessed a rapid development and implementation of holistic approaches to risks management in enterprises, unified in the modern business practice by the name of Enterprise Risk Management (ERM. Going along that line, the paper presents, through the basis of the EU New and Global Approach, the concept of risk assessment in the New Approach directives (Machinery, Lifts, ATEX, etc and provides the concept of its integration into the holistic approach of risks management in enterprises, such as ERM.

  15. Resource handbook on transport risk assessment (invited paper)

    International Nuclear Information System (INIS)

    Chen, S.Y.; Biwer, B.M.; Monette, F.A.; Luna, R.; Weiner, R.; Yoshimura, R.; Detrick, C.; Dunn, T.; Maheras, S.; Bhatnager, S.; Kapoor, A.K.

    2003-01-01

    The US Department of Energy's (DOE's) National Transportation Program established the DOE Transportation Risk Assessment Working Group (TRAWG) to develop the Resource Handbook on DOE Transportation Risk Assessment, published in July 2002. The working group is comprised of technical experts representing DOE national laboratories, the DOE Naval Reactors Program, and DOE contractors. The motivation behind preparing this handbook was to document and disseminate lessons learned and information accumulated from more than 20 years of experience by DOE and its contractors in preparing transport risk assessments that address the shipment of virtually all types of radioactive materials and wastes. The handbook is intended to serve as a primary source of information on conducting transport risk assessments for shipments of radioactive materials or wastes under both normal and accident conditions. The paper provides an overview of the information contained in the handbook. It should be recognised that development of radioactive materials transport risk assessment is an ongoing process, and that the analysis methods are regularly improved. The Resource Handbook on DOE Transportation Risk Assessment appears on the Web at www.ntp.doe.gov/transrisk_handbook.pdf. (author)

  16. A risk assessment methodology to evaluate the risk failure of managed aquifer recharge in the Mediterranean Basin

    Science.gov (United States)

    Rodríguez-Escales, Paula; Canelles, Arnau; Sanchez-Vila, Xavier; Folch, Albert; Kurtzman, Daniel; Rossetto, Rudy; Fernández-Escalante, Enrique; Lobo-Ferreira, João-Paulo; Sapiano, Manuel; San-Sebastián, Jon; Schüth, Christoph

    2018-06-01

    Managed aquifer recharge (MAR) can be affected by many risks. Those risks are related to different technical and non-technical aspects of recharge, like water availability, water quality, legislation, social issues, etc. Many other works have acknowledged risks of this nature theoretically; however, their quantification and definition has not been developed. In this study, the risk definition and quantification has been performed by means of fault trees and probabilistic risk assessment (PRA). We defined a fault tree with 65 basic events applicable to the operation phase. After that, we have applied this methodology to six different managed aquifer recharge sites located in the Mediterranean Basin (Portugal, Spain, Italy, Malta, and Israel). The probabilities of the basic events were defined by expert criteria, based on the knowledge of the different managers of the facilities. From that, we conclude that in all sites, the perception of the expert criteria of the non-technical aspects were as much or even more important than the technical aspects. Regarding the risk results, we observe that the total risk in three of the six sites was equal to or above 0.90. That would mean that the MAR facilities have a risk of failure equal to or higher than 90 % in the period of 2-6 years. The other three sites presented lower risks (75, 29, and 18 % for Malta, Menashe, and Serchio, respectively).

  17. Framework for technical assessment in JR Maglev

    Energy Technology Data Exchange (ETDEWEB)

    Seki, Akio [Central Japan Railway Co., Tokyo (Japan); Akahoshi, Toru [Central Japan Railway Co., Tokyo (Japan); Furuki, Tsutomu [Railway Technical Research Inst., Tokyo (Japan)

    1995-12-31

    In the course of development of JR Maglev, various technical assessments are carried out at each stage of development by a system management group of a project team in order to achieve goals of development. For the purpose, guidelines for practicality assessment were prepared at design stage. It is now striven to make test plans necessary for the practicality assessment. This assessment will serve for those to be ultimately implemented by Ministry of Transport (MOT). This paper presents an overview of concepts, methods and procedures of the technical assessments especially focused on the practicality assessment in the development of JR Maglev. (orig.)

  18. Pollution prevention opportunity assessment for Technical Art

    International Nuclear Information System (INIS)

    Torres, H.M.

    1995-09-01

    This pollution prevention opportunity assessment was conducted to evaluate Technical Art, which is part of the Technical Communications Department at Sandia National Laboratories/California. It is located in Building 912, Room 138. This assessment documents the processes, identifies the hazardous chemical waste streams generated by these processes, and recommends possible ways to minimize waste

  19. Military Ecological Risk Assessment Framework (MERAF) for Assessment of Risks of Military Training and Testing to Natural Resources

    Energy Technology Data Exchange (ETDEWEB)

    Suter II, G.W.

    2003-06-18

    The objective of this research is to provide the DoD with a framework based on a systematic, risk-based approach to assess impacts for management of natural resources in an ecosystem context. This risk assessment framework is consistent with, but extends beyond, the EPA's ecological risk assessment framework, and specifically addresses DoD activities and management needs. MERAF is intended to be consistent with existing procedures for environmental assessment and planning with DoD testing and training. The intention is to supplement these procedures rather than creating new procedural requirements. MERAF is suitable for use for training and testing area assessment and management. It does not include human health risks nor does it address specific permitting or compliance requirements, although it may be useful in some of these cases. Use of MERAF fits into the National Environmental Policy Act (NEPA) process by providing a consistent and rigorous way of organizing and conducting the technical analysis for Environmental Impact Statements (EISs) (Sigal 1993; Carpenter 1995; Canter and Sadler 1997). It neither conflicts with, nor replaces, procedural requirements within the NEPA process or document management processes already in place within DoD.

  20. Assessing the Environmental Risks of Nanomaterials

    DEFF Research Database (Denmark)

    Grieger, Khara Deanne; Hansen, Steffen Foss; Baun, Anders

    to a wide range of technical limitations. For instance, serious knowledge gaps remain within e.g. the detection of NM in the environment, developing adequate testing equipment and protocols, and toxicity endpoints (Grieger et al., 2009). In the past few years, many scientists and organizations have...... considered. Furthermore, we recommend the use of biomonitoring in some environmental ‘hot spots’ to serve as early warning detectors while the field of NM environmental risk assessment matures, as recommended in our previous work. Ultimately, this analysis may aid the advancement of environmental risk...

  1. Risk assessment of complex accident scenarios

    International Nuclear Information System (INIS)

    Kluegel, Jens-Uwe

    2012-01-01

    The use of methods of risk assessment in accidents in nuclear plants is based on an old tradition. The first consistent systematic study is considered to be the Rasmussen Study of the U.S. Nuclear Regulatory Commission, NRC, WASH-1400. Above and beyond the realm of nuclear technology, there is an extensive range of accident, risk and reliability research into technical-administrative systems. In the past, it has been this area of research which has led to the development of concepts of safety precautions of the type also introduced into nuclear technology (barrier concept, defense in depth, single-failure criterion), where they are now taken for granted as trivial concepts. Also for risk analysis, nuclear technology made use of methods (such as event and fault tree analyses) whose origins were outside the nuclear field. One area in which the use of traditional methods of probabilistic safety analysis is encountering practical problems is risk assessment of complex accident scenarios in nuclear technology. A definition is offered of the term 'complex accident scenarios' in nuclear technology. A number of problems are addressed which arise in the use of traditional PSA procedures in risk assessment of complex accident scenarios. Cases of complex accident scenarios are presented to demonstrate methods of risk assessment which allow robust results to be obtained even when traditional techniques of risk analysis are maintained as a matter of principle. These methods are based on the use of conditional risk metrics. (orig.)

  2. Challenge Course Facilitator Technical Skills Assessment Tool Mark

    Science.gov (United States)

    Wagstaff, William Quinn

    2007-01-01

    A study was conducted to develop a technical skills assessment tool for the training and development of challenge course facilitators. Researchers accessed two professional on-line listserves to collect a sample size of twenty-seven currently used technical skills assessment tools. The assessment tools were critically analysed by three independent…

  3. Technical assessment of continued wet storage of EBR-II fuel

    International Nuclear Information System (INIS)

    Pahl, R.G.; Franklin, E.M.; Ebner, M.A.

    1996-01-01

    A technical assessment of the continued wet storage of EBR-II fuel has been made. Previous experience has shown that in-basin cladding failure occurs by intergranular attack of sensitized cladding, likely assisted by basin water chlorides. Subsequent fuel oxidation is rapid and leads to loss of configuration and release of fission products. The current inventory of EBR-II fuel stored in the ICPP basins is at risk from similar corrosion reactions

  4. A framework for risk assessment on lean production implementation

    Directory of Open Access Journals (Sweden)

    Giuliano Almeida Marodin

    2014-02-01

    Full Text Available The organizational and technical complexity of implementing the lean principles and practices can become an extensively time consuming journey with few benefits. We argue that risk assessment can aid on the understanding and management of the major difficulties on the Lean production implementation (LPI. Thus, this paper proposes a framework for risk assessment on the LPI process. The literature review permitted to adapt the risk assessment steps to the characteristics of the LPI and develop data collection and analysis procedures for each step. The Sociotechnical systems (STS theory was brought in to improve the understanding of the context’s characteristics on the proposed framework because it has a major influence on the LPI. The framework was has five steps: (a defining the unit of analysis; (b describing the context; (c risk identification; (d risk analysis; and (e risk relationships modeling.

  5. Risk based optimization of technical specifications for operation of nuclear power plants

    International Nuclear Information System (INIS)

    1993-12-01

    The objective of the report is to present an overview of the risk and reliability based approaches (using a probabilistic safety assessment (PSA)) for improving nuclear power plant technical specifications (TS). In that case, it will provide an information base to the Member States in seeking PSA based applications to enhance the effectiveness of their technical specifications. To achieve this objective, the report discusses the basic objectives and reasons for seeking TS changes, the methods, data requirements and uses of different types of applications, and an overview of different applications that have been completed, including detailed descriptions of selected applications. Refs, figs and tabs

  6. Technical risk and society

    International Nuclear Information System (INIS)

    Lindackers, K.H.

    1983-01-01

    The report explains the possibilities and limits of risk analysis, risk assessment by the citizen, especially in hearings in the course of licensing procedures, and decisive causes why assessments on the part of the citizens may fail. (HP) [de

  7. Technical risks viewed from a legal point of view

    International Nuclear Information System (INIS)

    Marburger, P.

    1985-01-01

    Law has to impose restrictions to technology to assure its general compatibility. The difficult problems of handling technical risks by legislation are solvable. The scientific-technical knowledge which is a prerequisite of legislation is obtainable from the technical standards worked out by private organisations and from bodies of experts under public law. The system of law must not antagonize technology. (HP) [de

  8. Risk-based systems analysis for emerging technologies: Applications of a technology risk assessment model to public decision making

    International Nuclear Information System (INIS)

    Quadrel, M.J.; Fowler, K.M.; Cameron, R.; Treat, R.J.; McCormack, W.D.; Cruse, J.

    1995-01-01

    The risk-based systems analysis model was designed to establish funding priorities among competing technologies for tank waste remediation. The model addresses a gap in the Department of Energy's (DOE's) ''toolkit'' for establishing funding priorities among emerging technologies by providing disciplined risk and cost assessments of candidate technologies within the context of a complete remediation system. The model is comprised of a risk and cost assessment and a decision interface. The former assesses the potential reductions in risk and cost offered by new technology relative to the baseline risk and cost of an entire system. The latter places this critical information in context of other values articulated by decision makers and stakeholders in the DOE system. The risk assessment portion of the model is demonstrated for two candidate technologies for tank waste retrieval (arm-based mechanical retrieval -- the ''long reach arm'') and subsurface barriers (close-coupled chemical barriers). Relative changes from the base case in cost and risk are presented for these two technologies to illustrate how the model works. The model and associated software build on previous work performed for DOE's Office of Technology Development and the former Underground Storage Tank Integrated Demonstration, and complement a decision making tool presented at Waste Management 1994 for integrating technical judgements and non-technical (stakeholder) values when making technology funding decisions

  9. Social aspects of risk assessment

    International Nuclear Information System (INIS)

    Otway, H.J.; Linnerooth, J.; Niehaus, F.

    1977-01-01

    Plans for technological development have often been met by demands for a closer examination of the associated benefits and risks and the consideration of social values in public planning and decision processes. A theoretical framework for inter-disciplinary risk assessment studies is presented to aid the balancing of technical data with social values in decision making. Methods for obtaining value measures are reviewed and an attitude-based method is developed in detail; this model allows identification of the relative importance of the technical, psychological and social factors which underlie attitudes and indicates which factors differentiate between social groups. Results of a pilot application to nuclear power are summarized. For these subjects, different attitudes between pro and con were primarily due to strongly differing beliefs about the benefits of nuclear power. Preliminary results are reported of an application of this model with a heterogeneous sample drawn from the general public. The cognitive limitations which affect rationality in intuitive decision making are summarized as background to introduce formal decision methodologies for the use of attitude data in public decision making

  10. Twelve tips for assessing surgical performance and use of technical assessment scales

    DEFF Research Database (Denmark)

    Strandbygaard, Jeanett; Scheele, Fedde; Sørensen, Jette Led

    2017-01-01

    Using validated assessment scales for technical competence can help structure and standardize assessment and feedback for both the trainee and the supervisor and thereby avoid bias and drive learning. Correct assessment of operative skills can establish learning curves and allow adequate monitoring....... However, the assessment of surgical performance is not an easy task, since it includes many proxy parameters, which are hard to measure. Although numerous technical assessment scales exist, both within laparoscopic and open surgery, the validity evidence is often sparse, and this can raise doubts about...... reliability and educational outcome. Furthermore, the implementation of technical assessment scales varies due to several obstacles and doubts about accurate use. In this 12-tips article, we aim to give the readers a critical and useful appraisal of some of the common questions and misunderstandings regarding...

  11. Comparison of seismic margin assessment and probabilistic risk assessment in seismic IPE

    International Nuclear Information System (INIS)

    Reed, J.W.; Kassawara, R.P.

    1993-01-01

    A comparison of technical requirements and managerial issues between seismic margin assessment (SMA) and seismic probabilistic risk assessment (SPRA) in a seismic Individual Plant Examination (IPE) is presented and related to requirements for an Unresolved Safety Issue (USI) A-46 review which is required for older nuclear power plants. Advantages and disadvantages are discussed for each approach. Technical requirements reviewed for a seismic IPE include: scope of plants covered, seismic input, scope of review, selection of equipment, required experience and training of engineers, walkdown procedure, evaluation of components, relay review, containment review, quality assurance, products, documentation requirements, and closure procedure. Managerial issues discussed include regulatory acceptability, compatibility with seismic IPE, compliance with seismic IPE requirements, ease of use by utilities, and relative cost

  12. A review of probabilistic risk assessment of contaminated land

    International Nuclear Information System (INIS)

    Oeberg, T.; Bergbaeck, B.

    2005-01-01

    Background, Aims and Scope. The management and decisions concerning restoration of contaminated land often require indepth risk analyses. An environmental risk assessment is generally described as proceeding in four separate steps: hazard identification, dose-response assessment, exposure assessment, and risk characterization. The risk assessment should acknowledge and quantify the uncertainty in risk predictions. This can be achieved by applying probabilistic methods which, although they have been available for many years, are still not generally used. Risk assessment of contaminated land is an area where probabilistic methods have proved particularly useful. Many reports have appeared in the literature, mostly by North American researchers. The aim of this review is to summarize the experience gained so far, provide a number of useful examples, and suggest what may be done to promote probabilistic methods in Europe and the rest of the world. Methods. The available literature has been explored through searches in the major scientific and technical databases, WWW resources, textbooks and direct contacts with active researchers. A calculation example was created using standard simulation software. (orig.)

  13. A Perkins Challenge: Assessing Technical Skills in CTE

    Science.gov (United States)

    Stone, James R., III

    2009-01-01

    Federal law requires state to develop performance measures and data-collection systems for secondary and postsecondary technical-skill attainment. This poses many challenges, such as defining a technical skills, measurement and when to assess students. In this article, the author outlines various assessment models and looks at the challenges…

  14. Assessment of technical risks and energy consumption of processes for regeneration of polluted land; Abschaetzung von technischem Risiko und Energiebedarf bei Sanierungsmassnahmen fuer Altlasten

    Energy Technology Data Exchange (ETDEWEB)

    Trappmann, F.

    1997-04-01

    In case of sensitive use of a site or its surroundings further consideration on pre-elevated remedial action designs should be undertaken. The generated method for the assessment of technical risks and energy consumption intends to enable different users with smaller or broader specialist knowledge to handle the problem. Basic instrument for the variation of intensity of handling is to divide the technical process in a special way into small elements, called module. With regard to the processing line and to the complexity of the process the modules are connected on different levels according to their common function. The levels handled by experts are called detailed risks assessment, the abridged kind of handling is especially for authorities. For some types of contaminations and some technologies are tools and lists available to enable an easier treatment. Generally the method and the tools are employable for other sites too. For the comparative assimilating assessment itself verbal argumentation is used to describe the causes, that modules are identified as weak (in comparison). The result of the consideration is a ranking of the prefered applied technologies rated by energy consumption and technical risks or a demand for special improvements in the case of commissioning. (orig.) [Deutsch] Die vorliegende Dissertation konzentriert sich auf die weitergehende Risiko- und Energiebetrachtung weniger, zuvor mittels strukturierter Auswahlverfahren favorisierter Sanierungsszenarien. Zwecks effizienter Ausnutzung verfuegbarer Finanzmittel erscheint es angemessen, die bislang in ihrer Gesamtheit betrachteten Verfahrensschritte intern eingehender zu untersuchen und potentielle Risiken bewertbar zu machen. Die geschilderte Vorgehensweise basiert auf der Untergliederung komplexer Sanierungsszenarien in einzelne Elemente (Moduln etc.) gemaess dem funktionalen Zusammenwirken und dem Verfahrensablauf. Fuer einzelne Moduln koennen im Rahmen detaillierterer Betrachtungen

  15. Definition of technical risks in terms of law

    International Nuclear Information System (INIS)

    Rossnagel, A.

    1986-01-01

    The legal system has to acknowledge that complete absence of risk is unattainable. The core question of the law governing technological issues therefore is: How safe is safe enough. The law cannot entirely prohibit technical risks; all it can do is aiming at proper control of unavoidable risks, making a distribution between permissible and non-permissible risks, the consequence of this approach being that a permissible risk cannot be termed to be unlawful once it because a real event. It certainly is a difficult task to find legal rules and provisions that are so perfectly geared to the technical facts and problems that they really allow technology to be controlled, supervised and, if necessary, kept in check along the lines set by the law. The article in hand discusses some proposals as to the formulation of technical risks in terms of law in order to improve existing provisions in the body of law. As an example of what needs improvement, the author discusses the acceptance and acceptability of a hazardous activity, which, the author says, is not guaranteed by the procedure alone that is currently available, namely administrative procedure and licensing procedure. The administrative procedures are said to be insufficient and not complex enough to gather all necessary and relevant information for solving the problems involved. The proposal in the article therefore is to put the question 'How safe is safe enough' to the inhabitants of the region concerned, so that the acceptance of a hazardous activity would depend on a licence issued by the competent authority, and on the approval of the population affected, as certained by a non-compulsory administrative referendum. (orig./HSCH) [de

  16. Assessing Technical Competence in Surgical Trainees: A Systematic Review.

    Science.gov (United States)

    Szasz, Peter; Louridas, Marisa; Harris, Kenneth A; Aggarwal, Rajesh; Grantcharov, Teodor P

    2015-06-01

    To systematically examine the literature describing the methods by which technical competence is assessed in surgical trainees. The last decade has witnessed an evolution away from time-based surgical education. In response, governing bodies worldwide have implemented competency-based education paradigms. The definition of competence, however, remains elusive, and the impact of these education initiatives in terms of assessment methods remains unclear. A systematic review examining the methods by which technical competence is assessed was conducted by searching MEDLINE, EMBASE, PsychINFO, and the Cochrane database of systematic reviews. Abstracts of retrieved studies were reviewed and those meeting inclusion criteria were selected for full review. Data were retrieved in a systematic manner, the validity and reliability of the assessment methods was evaluated, and quality was assessed using the Grading of Recommendations Assessment, Development and Evaluation classification. Of the 6814 studies identified, 85 studies involving 2369 surgical residents were included in this review. The methods used to assess technical competence were categorized into 5 groups; Likert scales (37), benchmarks (31), binary outcomes (11), novel tools (4), and surrogate outcomes (2). Their validity and reliability were mostly previously established. The overall Grading of Recommendations Assessment, Development and Evaluation for randomized controlled trials was high and low for the observational studies. The definition of technical competence continues to be debated within the medical literature. The methods used to evaluate technical competence predominantly include instruments that were originally created to assess technical skill. Very few studies identify standard setting approaches that differentiate competent versus noncompetent performers; subsequently, this has been identified as an area with great research potential.

  17. Risk Assessment in Finland: Theory and Practice

    Directory of Open Access Journals (Sweden)

    Hannu Anttonen

    2010-09-01

    Full Text Available The Finnish risk assessment practice is based on the Occupational Safety and Health Act aiming to improve working conditions in order maintain the employees' work ability, and to prevent occupational accidents and diseases. In practice there are hundreds of risk assessment methods in use. A simple method is used in SME's and more complex risk evaluation methods in larger work places. Does the risk management function in the work places in Finland? According to our experience something more is needed. That is, understanding of common and company related benefits of risk management. The wider conclusion is that commitment for risk assessment in Finland is high enough. However, in those enterprises where OSH management was at an acceptable level or above it, there were also more varied and more successfully accomplished actions to remove or reduce the risks than in enterprises, where OSH management was in lower level. In risk assessment it is important to process active technical prevention and exact communication, increase work place attraction and increase job satisfaction and motivation. Investments in occupational safety and health are also good business. Low absenteeism due to illness or accidents increases directly the production results by improved quality and quantity of the product. In general Finnish studies have consistently shown that the return of an invested euro is three to seven-old. In national level, according to our calculations the savings could be even 20% of our gross national product.

  18. Designing Second Language Performance Assessments. Technical Report.

    Science.gov (United States)

    Norris, John M.; Brown, James Dean; Hudson, Thom; Yoshioka, Jim

    This technical report focuses on the decision-making potential provided by second language performance assessments. First, performance assessment is situated within the broader discussion of alternatives in language assessment and in educational assessment in general. Next, issues in performance assessment design, implementation, reliability, and…

  19. American Samoa Initial Technical Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Conrad, M.; Funk, K.; Kandt, A.; McNutt, P.

    2011-09-01

    This document is an initial energy assessment for American Samoa, the first of many steps in developing a comprehensive energy strategy. On March 1, 2010, Assistant Secretary of the Interior Tony Babauta invited governors and their staff from the Interior Insular Areas to meet with senior principals at the National Renewable Energy Laboratory (NREL). Meeting discussions focused on ways to improve energy efficiency and increase the deployment of renewable energy technologies in the U.S. Pacific Territories. In attendance were Governors Felix Camacho (Guam), Benigno Fitial (Commonwealth of the Northern Mariana Islands), and Togiola Tulafono, (American Samoa). This meeting brought together major stakeholders to learn and understand the importance of developing a comprehensive strategic plan for implementing energy efficiency measures and renewable energy technologies. For several decades, dependence on fossil fuels and the burden of high oil prices have been a major concern but never more at the forefront as today. With unstable oil prices, the volatility of fuel supply and the economic instability in American Samoa, energy issues are a high priority. In short, energy security is critical to American Samoa's future economic development and sustainability. Under an interagency agreement, funded by the Department of Interior's Office of Insular Affairs, NREL was tasked to deliver technical assistance to the islands of American Samoa. Technical assistance included conducting an initial technical assessment to define energy consumption and production data, establish an energy consumption baseline, and assist with the development of a strategic plan. The assessment and strategic plan will be used to assist with the transition to a cleaner energy economy. NREL provided an interdisciplinary team to cover each relevant technical area for the initial energy assessments. Experts in the following disciplines traveled to American Samoa for on-island site assessments: (1

  20. Emerging contaminants: Presentations at the 2009 Toxicology and Risk Assessment Conference

    International Nuclear Information System (INIS)

    Murnyak, George; Vandenberg, John; Yaroschak, Paul J.; Williams, Larry; Prabhakaran, Krishnan; Hinz, John

    2011-01-01

    A session entitled 'Emerging Contaminants' was held in April 2009 in Cincinnati, OH at the 2009 Toxicology and Risk Assessment Conference. The purpose of the session was to share information on both programmatic and technical aspects associated with emerging contaminants. Emerging contaminants are chemicals or materials that are characterized by a perceived or real threat to human health or environment, a lack of published health standards or an evolving standard. A contaminant may also be 'emerging' because of the discovery of a new source, a new pathway to humans, or a new detection method or technology. The session included five speakers representing the Department of Defense (DoD), the Environmental Protection Agency (EPA), and each of the military services. The DoD created the Emerging Contaminant Directorate to proactively address environmental, health, and safety concerns associated with emerging contaminants. This session described the scan-watch-action list process, impact assessment methodology, and integrated risk management concept that DoD has implemented to manage emerging contaminants. EPA presented emerging trends in health risk assessment. Researchers made technical presentations on the status of some emerging contaminates in the assessment process (i.e. manganese, RDX, and naphthalene).

  1. The importance of probabilistic evaluations in connection with risk analyses according to technical safety laws

    International Nuclear Information System (INIS)

    Mathiak, E.

    1984-01-01

    The nuclear energy sector exemplifies the essential importance to be attached to the practical application of probabilistic evaluations (e.g. probabilistic reliability analyses) in connection with the legal risk assessment of technical systems and installations. The study is making use of a triad risk analysis and tries to reconcile the natural science and legal points of view. Without changing the definitions of 'risk' and 'hazard' in the legal sense of their meaning the publication discusses their reconcilation with the laws of natural science, their interpretation and application in view of the latter. (HSCH) [de

  2. Contrasting safety assessments of a runway incursion scenario: Event sequence analysis versus multi-agent dynamic risk modelling

    International Nuclear Information System (INIS)

    Stroeve, Sybert H.; Blom, Henk A.P.; Bakker, G.J.

    2013-01-01

    In the safety literature it has been argued, that in a complex socio-technical system safety cannot be well analysed by event sequence based approaches, but requires to capture the complex interactions and performance variability of the socio-technical system. In order to evaluate the quantitative and practical consequences of these arguments, this study compares two approaches to assess accident risk of an example safety critical sociotechnical system. It contrasts an event sequence based assessment with a multi-agent dynamic risk model (MA-DRM) based assessment, both of which are performed for a particular runway incursion scenario. The event sequence analysis uses the well-known event tree modelling formalism and the MA-DRM based approach combines agent based modelling, hybrid Petri nets and rare event Monte Carlo simulation. The comparison addresses qualitative and quantitative differences in the methods, attained risk levels, and in the prime factors influencing the safety of the operation. The assessments show considerable differences in the accident risk implications of the performance of human operators and technical systems in the runway incursion scenario. In contrast with the event sequence based results, the MA-DRM based results show that the accident risk is not manifest from the performance of and relations between individual human operators and technical systems. Instead, the safety risk emerges from the totality of the performance and interactions in the agent based model of the safety critical operation considered, which coincides very well with the argumentation in the safety literature.

  3. Procedures for controlling the risks of reliability, safety, and availability of technical systems

    International Nuclear Information System (INIS)

    1987-01-01

    The reference book covers four sections. Apart from the fundamental aspects of the reliability problem, of risk and safety and the relevant criteria with regard to reliability, the material presented explains reliability in terms of maintenance, logistics and availability, and presents procedures for reliability assessment and determination of factors influencing the reliability, together with suggestions for systems technical integration. The reliability assessment consists of diagnostic and prognostic analyses. The section on factors influencing reliability discusses aspects of organisational structures, programme planning and control, and critical activities. (DG) [de

  4. Occupational health policies on risk assessment in Japan.

    Science.gov (United States)

    Horie, Seichi

    2010-09-01

    Industrial Safety and Health Law (ISH Law) of Japan requires abnormalities identified in evaluations of worker health and working environments are reported to occupational physicians, and employers are advised of measures to ensure appropriate accommodations in working environments and work procedures. Since the 1980s, notions of a risk assessment and occupational safety and health management system were expected to further prevent industrial accidents. In 2005, ISH Law stipulated workplace risk assessment using the wording "employers shall endeavor." Following the amendment, multiple documents and guidelines for risk assessment for different work procedures were developed. They require ISH Laws to be implemented fully and workplaces to plan and execute measures to reduce risks, ranking them from those addressing potential hazards to those requiring workers to wear protective articles. A governmental survey in 2005 found the performance of risk assessment was 20.4% and common reasons for not implementing risk assessments were lack of adequate personnel or knowledge. ISH Law specifies criminal penalties for both individuals and organizations. Moreover, under the Labor Contract Law promulgated in 2007, employers are obliged to make reasonable efforts to ensure employee health for foreseeable and avoidable risks. Therefore, enterprises neglecting even the non-binding provisions of guidelines are likely to suffer significant business impact if judged to be responsible for industrial accidents or occupational disease. To promote risk assessment, we must strengthen technical, financial, and physical support from public-service organizations, encourage the dissemination of good practices to reduce risks, and consider additional employer incentives, including relaxed mandatory regulations.

  5. Occupational Health Policies on Risk Assessment in Japan

    Directory of Open Access Journals (Sweden)

    Seichi Horie

    2010-09-01

    Full Text Available Industrial Safety and Health Law (ISH Law of Japan requires abnormalities identifi ed in evaluations of worker health and working environments are reported to occupational physicians, and employers are advised of measures to ensure appropriate accommodations in working environments and work procedures. Since the 1980s, notions of a risk assessment and occupational safety and health management system were expected to further prevent industrial accidents. In 2005, ISH Law stipulated workplace risk assessment using the wording “employers shall endeavor.” Following the amendment, multiple documents and guidelines for risk assessment for different work procedures were developed. They require ISH Laws to be implemented fully and workplaces to plan and execute measures to reduce risks, ranking them from those addressing potential hazards to those requiring workers to wear protective articles. A governmental survey in 2005 found the performance of risk assessment was 20.4% and common reasons for not implementing risk assessments were lack of adequate personnel or knowledge. ISH Law specifi es criminal penalties for both individuals and organizations. Moreover, under the Labor Contract Law promulgated in 2007, employers are obliged to make reasonable efforts to ensure employee health for foreseeable and avoidable risks. Therefore, enterprises neglecting even the non-binding provisions of guidelines are likely to suffer signifi cant business impact if judged to be responsible for industrial accidents or occupational disease. To promote risk assessment, we must strengthen technical, fi nancial, and physical support from public-service organizations, encourage the dissemination of good practices to reduce risks, and consider additional employer incentives, including relaxed mandatory regulations.

  6. The use of comparative risk assessment in decision making

    International Nuclear Information System (INIS)

    Chicken, J.C.; Hayns, M.R.; Tolley, B.

    1989-01-01

    This paper justifies: 1) Comparative risk assessment provides a way of establishing whether or not the risks associated with a novel proposal are likely to satisfy current norms. 2) Comparative risk assessment is an aid to decision making when for some reason there is inadequate quantitative data about the risks associated with a project. 3) One problem is that there is no single universally acceptable norm. Norms vary both with time and from activity to activity. The spread of acceptable norms spans at least two orders of magnitude. 4) For any comparative risk assessment to be considered more than a suggestion on how acceptable a risk is, the risks that are compared must be similar and located in similar cultural and geographical environments. 5) Ulitmately justification of the acceptability of a project must be based on data generated directly by the project itself and any opinion based on comparative evidence must be iteratively revised as direct hard evidence becomes available. 6) Comparative risk assessment has a useful role in presentations to the lay public about the acceptability of a particular risk. 7) There may be more problems in making a comparative assessment of risk acceptability in socio-political terms than in technical or economic terms. The central requirement that the comparison must be based on data from similar cultural backgrounds is often hard to satisfy in relation to socio-political considerations

  7. Assessment of technical and nontechnical skills in surgical residents.

    Science.gov (United States)

    Ponton-Carss, Alicia; Kortbeek, John B; Ma, Irene W Y

    2016-11-01

    Surgical competence encompasses both technical and nontechnical skills. This study seeks to evaluate the validity evidence for a comprehensive surgical skills examination and to examine the relationship between technical and nontechnical skills. Six examination stations assessing both technical and nontechnical skills, conducted yearly for surgical trainees (n = 120) between 2010 and 2014 are included. The assessment tools demonstrated acceptable internal consistency. Interstation reliability for technical skills was low (alpha = .39). Interstation reliability for the nontechnical skills was lower (alpha range -.05 to .31). Nontechnical skills domains were strongly correlated, ranging from r = .65, P skills were inconsistent, ranging from poor (r = -.06; P = .54) to moderate (r = .45; P skills are necessary to assess overall surgical competency. Copyright © 2016 Elsevier Inc. All rights reserved.

  8. The Development of the easyCBM CCSS Reading Assessments: Grade 3. Technical Report #1221

    Science.gov (United States)

    Alonzo, Julie; Park, Bitnara Jasmine; Tindal, Gerald

    2012-01-01

    In this technical report, we document the development and piloting of easyCBM reading measures aligned to the Common Core State Standards, designed for use in screening students at risk for reading difficulty and monitoring their progress as they develop reading skills. The measures, which assess students' ability to respond to…

  9. Decision-Making for Systemic Water Risks: Insights From a Participatory Risk Assessment Process in Vietnam

    Science.gov (United States)

    Wyrwoll, Paul R.; Grafton, R. Quentin; Daniell, Katherine A.; Chu, Hoang Long; Ringler, Claudia; Lien, Le Thi Ha; Khoi, Dang Kim; Do, Thang Nam; Tuan, Nguyen Do Anh

    2018-03-01

    Systemic threats to food-energy-environment-water systems require national policy responses. Yet complete control of these complex systems is impossible and attempts to mitigate systemic risks can generate unexpected feedback effects. Perverse outcomes from national policy can emerge from the diverse responses of decision-makers across different levels and scales of resource governance. Participatory risk assessment processes can help planners to understand subnational dynamics and ensure that policies do not undermine the resilience of social-ecological systems and infrastructure networks. Researchers can play an important role in participatory processes as both technical specialists and brokers of stakeholder knowledge on the feedbacks generated by systemic risks and policy decisions. Here, we evaluate the use of causal modeling and participatory risk assessment to develop national policy on systemic water risks. We present an application of the Risks and Options Assessment for Decision-Making (ROAD) process to a district of Vietnam where national agricultural water reforms are being piloted. The methods and results of this project provide general insights about how to support resilient decision-making, including the transfer of knowledge across administrative levels, identification of feedback effects, and the effective implementation of risk assessment processes.

  10. Environmental risk assessment of the polycyclic musks AHTN and HHCB according to the EU-TGD

    NARCIS (Netherlands)

    Plassche EJ van de; Balk F; CSR

    1997-01-01

    An environmental risk assessment has been carried out for the polycyclic musks AHTN and HHCB according to the EU Technical Guidance Document for Environmental Risk Assessment for New and Existing Substances. AHTN and HHCB are used in fragrances for cosmetics and detergents. Both substances are high

  11. Identifying Factors Associated with Risk Assessment Competencies of Public Health Emergency Responders.

    Science.gov (United States)

    Hao, Jiejing; Ren, Jiaojiao; Wu, Qunhong; Hao, Yanhua; Sun, Hong; Ning, Ning; Ding, Ding

    2017-06-04

    This study aimed to better understand the current situation of risk assessment and identify the factors associated with competence of emergency responders in public health risk assessment. The participants were selected by a multi-stage, stratified cluster sampling method in Heilongjiang Centers for Disease Control and Prevention (CDC). The questionnaires that measured their perceptions on risk assessment competences were administered through the face-to-face survey. A final sample of 1889 staff was obtained. Of this sample, 78.6% of respondents rated their own risk assessment competences as "relatively low", contrasting with 21.4% rated as "relatively high". Most of the respondents (62.7%) did not participate in any risk assessment work. Only 13.7% and 42.7% of respondents reported participating in risk assessment training and were familiar with risk assessment tools. There existed statistical significance between risk assessment-related characteristics of respondents and their self-rated competences scores. Financial support from the government and administrative attention were regarded as the important factors contributing to risk assessment competences of CDC responders. Higher attention should be given to risk assessment training and enhancing the availability of surveillance data. Continuous efforts should be made to remove the financial and technical obstacles to improve the competences of risk assessment for public health emergency responders.

  12. Risk based regulation: a convenient concept for legislation and regulation in the field of technical risks?

    International Nuclear Information System (INIS)

    Seiler, J.H.

    1998-01-01

    Legislation and regulation concerning risk activities are traditionally based on deterministic safety measures. This may lead to inefficient results: sometimes the law requires safety measures which are - from an economic viewpoint - not justified because of their poor cost-effectiveness; sometimes it does not require safety measures although they would be very efficient. The risk based regulation approach wants to make the law more efficient and to get more safety at less costs. Legislation and regulation should be based on terms of risk rather than on deterministic rules. Risk should be expressed in quantitative terms and risk regulation should be based on the cost-effectiveness of safety measures. Thus a most efficient (in the sense of the economic analysis of the law) strategy for safety and environmental law could be established. The approach is economically reasonable and theoretically convincing. Its practical implementation however raises a lot of technical and legal questions. The project 'Risk Based Regulation' (1996-1999), sponsored by the Swiss National Fund for Scientific Research, intends to evaluate the practical feasibility of the approach from a technical and a legal view. It contains a general part which describes the risk based regulation approach and its legal and technical questions, case studies which try to practically implement the risk based regulation approach; the case studies are: storage and management of explosives in the army, storage and management of explosives for non-military purposes, safety at work, accident prevention in the non-professional field (mainly road accidents), fire protection, transportation of dangerous goods, waste disposal: traditional waste, waste disposal: radioactive waste, nuclear energy (reactor safety), a synthesis with recommendations for the future legislation and regulation in the field of technical risks. The paper presents the project and its preliminary results. (author)

  13. Risk and dose assessment methods in gamma knife QA

    International Nuclear Information System (INIS)

    Banks, W.W.; Jones, E.D.; Rathbun, P.

    1992-10-01

    Traditional methods used in assessing risk in nuclear power plants may be inappropriate to use in assessing medical radiation risks. The typical philosophy used in assessing nuclear reactor risks is machine dominated with only secondary attention paid to the human component, and only after critical machine failure events have been identified. In assessing the risk of a misadministrative radiation dose to patients, the primary source of failures seems to stem overwhelmingly, from the actions of people and only secondarily from machine mode failures. In essence, certain medical misadministrations are dominated by human events not machine failures. Radiological medical devices such as the Leksell Gamma Knife are very simple in design, have few moving parts, and are relatively free from the risks of wear when compared with a nuclear power plant. Since there are major technical differences between a gamma knife and a nuclear power plant, one must select a particular risk assessment method which is sensitive to these system differences and tailored to the unique medical aspects of the phenomena under study. These differences also generate major shifts in the philosophy and assumptions which drive the risk assessment (Machine-centered vs Person-centered) method. We were prompted by these basic differences to develop a person-centered approach to risk assessment which would reflect these basic philosophical and technological differences, have the necessary resolution in its metrics, and be highly reliable (repeatable). The risk approach chosen by the Livermore investigative team has been called the ''Relative Risk Profile Method'' and has been described in detail by Banks and Paramore, (1983)

  14. Participatory Risk Assessment for Environmental Decision-Making

    International Nuclear Information System (INIS)

    Homan, Jacqueline; Petts, Judith

    2001-01-01

    Recent research, discussion and practice in the role environmental decision-making as an integral part of a democratic society have resulted in legislation, policy and guidance that encourage, and indeed may require, greater participation. The focus of this research paper is to explore these participatory ideas in the context of environmental risk assessment. Participation methods have generic application. However, the importance of fitting method to purpose requires that different contexts and issues relative to the objectives be addressed. In relation to environmental risk assessment these issues include: the complexity of risk issues per se; the inherent uncertainty that dominates any risk assessment; the quantitative nature of many risk assessments and the difficulty of dealing with low probability-high consequence outconies; the possibility of controversy in relation to decisions involving risk and thus the careful attention needed to the process and identification of participants; the traditional role and culture of experts in risk decisions and the challenge of reconciling this with the role of lay knowledge and the potential for the public to act as quality assurers in the risk decision process; the tendency for people to need reassurance when confronted with risk, even during a participation process; the need to acknowledge the public's ability to deal with complex technical issues and the need for information and data to respond to their questions, and the fact that 'risk' per se will often not be the only issue of public concern. The contributions to the risk debate from the social sciences are having considerable influence on the practice of environmental decision-making. Calls for increased stakeholder involvement in risk decisions are requiring greater access to and engagement with environmental risk assessments. Mechanisms for this level of involvement, however, are not well defined. For these aspirational calls to be realised in practice, decision

  15. Participatory Risk Assessment for Environmental Decision-Making

    Energy Technology Data Exchange (ETDEWEB)

    Homan, Jacqueline; Petts, Judith [Univ. of Birmingham (United Kingdom). Centre for Environmental Research and Training; Pollard, Simon; Twigger-Ross, Clare [National Centre for Risk Analysis and Options Appraisal, London (United Kingdom)

    2001-07-01

    Recent research, discussion and practice in the role environmental decision-making as an integral part of a democratic society have resulted in legislation, policy and guidance that encourage, and indeed may require, greater participation. The focus of this research paper is to explore these participatory ideas in the context of environmental risk assessment. Participation methods have generic application. However, the importance of fitting method to purpose requires that different contexts and issues relative to the objectives be addressed. In relation to environmental risk assessment these issues include: the complexity of risk issues per se; the inherent uncertainty that dominates any risk assessment; the quantitative nature of many risk assessments and the difficulty of dealing with low probability-high consequence outconies; the possibility of controversy in relation to decisions involving risk and thus the careful attention needed to the process and identification of participants; the traditional role and culture of experts in risk decisions and the challenge of reconciling this with the role of lay knowledge and the potential for the public to act as quality assurers in the risk decision process; the tendency for people to need reassurance when confronted with risk, even during a participation process; the need to acknowledge the public's ability to deal with complex technical issues and the need for information and data to respond to their questions, and the fact that 'risk' per se will often not be the only issue of public concern. The contributions to the risk debate from the social sciences are having considerable influence on the practice of environmental decision-making. Calls for increased stakeholder involvement in risk decisions are requiring greater access to and engagement with environmental risk assessments. Mechanisms for this level of involvement, however, are not well defined. For these aspirational calls to be realised in

  16. Predicting technology operational availability using technical maturity assessment

    International Nuclear Information System (INIS)

    Kenley, C.R.; Creque, T.R.

    1998-01-01

    A technical maturity assessment method was performed by systems engineers in collaboration with an advisory panel composed of team members from different Department of Energy sites and from different engineering and science disciplines. Various stabilization technologies were assessed annually as to their relative maturity and availability for use in stabilizing nuclear materials. After three years of assessments, several of the technologies are now components of operational systems. A regression analysis of the historical assessments was performed, and it was concluded that the numerical technical maturity score produced by a team of experts can provide a powerful predictor of the time remaining until the operational application of technologies

  17. Triggered lightning risk assessment for reusable launch vehicles at four regional spaceports

    Science.gov (United States)

    2010-04-30

    The Aerospace Corporation was tasked by the Volpe National Transportation Systems Center to provide technical support to the Federal Aviation Administration, Office of Commercial Space Transportation, in assessing the risks involved with triggered li...

  18. Risk assessment of major hazards: Hazardous materials transportation in urban areas

    Energy Technology Data Exchange (ETDEWEB)

    Hubert, Ph; Pages, P

    1988-02-01

    There is no doubt that, thanks to the pioneering studies of the late seventies and the early eighties, a methodology has been made available that allows risk management of hazardous transportation in urban areas. This approach can easily be extended to the management of other similar risks (storages and to some extent natural hazards). The methodology is both technically available and affordable. The insertion within the decision making processes deserves still some efforts. It has be seen that the applications are broad and numerous. They range from route selection to emergency preparedness, with some insights into acceptability considerations. One limit to the use of such studies, aiming to an objective assessment of the risk, is the complexity of the decision problems, where many factors are to be considered, the most subtle being the one linked to acceptability. However, as such studies develop, those factors start to be clarified, and decision makers learn how to use risk indices in this context. So at the present time it can be said that risk analyses are a valuable input into the decision making process in most cases. And, as more experience is acquired the uses are broader. As any technical innovation risk assessment modifies the approaches to the questions it is dealing with. It seems impossible now to treat those kinds of risks as was done ten years ago.

  19. Risk assessment of major hazards: Hazardous materials transportation in urban areas

    International Nuclear Information System (INIS)

    Hubert, Ph.; Pages, P.

    1988-02-01

    There is no doubt that, thanks to the pioneering studies of the late seventies and the early eighties, a methodology has been made available that allows risk management of hazardous transportation in urban areas. This approach can easily be extended to the management of other similar risks (storages and to some extent natural hazards). The methodology is both technically available and affordable. The insertion within the decision making processes deserves still some efforts. It has be seen that the applications are broad and numerous. They range from route selection to emergency preparedness, with some insights into acceptability considerations. One limit to the use of such studies, aiming to an objective assessment of the risk, is the complexity of the decision problems, where many factors are to be considered, the most subtle being the one linked to acceptability. However, as such studies develop, those factors start to be clarified, and decision makers learn how to use risk indices in this context. So at the present time it can be said that risk analyses are a valuable input into the decision making process in most cases. And, as more experience is acquired the uses are broader. As any technical innovation risk assessment modifies the approaches to the questions it is dealing with. It seems impossible now to treat those kinds of risks as was done ten years ago

  20. Assessing reservoir performance risk in CO2 storage projects

    International Nuclear Information System (INIS)

    Bowden, A.R.; Rigg, A.

    2005-01-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO 2 ) has been the development of a proper methodology to assess and compare alternative CO 2 injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO 2 , and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO 2 injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO 2 injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs

  1. Branch technical position for performance assessment of low-level radioactive waste disposal facilities

    International Nuclear Information System (INIS)

    Campbell, A.C.; Abramson, L.; Byrne, R.M.

    1994-01-01

    The U.S. Nuclear Regulatory Commission has developed a Draft Branch Technical Position on Performance Assessment of Low-Level Radioactive Waste Disposal Facilities. The draft technical position addresses important issues in performance assessment modeling and provides a framework and technical basis for conducting and evaluating performance assessments in a disposal facility license application. The technical position also addresses specific technical policy issues and augments existing NRC guidance pertaining to LLW performance assessment

  2. Technical methods for a risk-informed, performance-based fire protection program at nuclear power plants

    International Nuclear Information System (INIS)

    Dey, M.K.

    2000-01-01

    This paper presents a technical review and examination of technical methods that are available for developing a risk-informed, performance-based fire protection program at a nuclear plant. The technical methods include 'engineering tools' for examining the fire dynamics of fire protection problems, reliability techniques for establishing an optimal fire protection surveillance program, fire computer codes for analyzing important fire protection safety parameters, and risk-informed approaches that can range from drawing qualitative insights from risk information to quantifying the risk impact of alternative fire protection approaches. Based on this technical review and examination, it is concluded that methods for modeling fires, and reliability and fire probabilistic risk analyses (PRA) are currently available to support the initial implementation of simple risk-informed, performance-based approaches in fire protection programs. (orig.) [de

  3. Mathematical models of cancer and their use in risk assessment. Technical report No. 27

    International Nuclear Information System (INIS)

    Whittemore, A.S.

    1979-08-01

    The sensitivity of risk predictions to certain assumptions in the underlying mathematical model is illustrated. To avoid the misleading and erroneous predictions that can result from the use of models incorporating assumptions whose validity is questionable, the following steps should be taken. First, state the assumptions used in a proposed model in terms that are clear to all who will use the model to assess risk. Second, assess the sensitivity of predictions to changes in model assumptions. Third, scrutinize pivotal assumptions in light of the best available human and animal data. Fourth, stress inconsistencies between model assumptions and experimental or epidemiological observations. The model fitting procedure will yield the most information when the data discriminates between theories because of their inconsistency with one or more assumptions. In this sense, mathematical theories are most successful when they fail. Finally, exclude value judgments from the quantitative procedures used to assess risk; instead include them explicitly in that part of the decision process concerned with cost-benefit analysis

  4. Technical Assessment Of Selection Of A Waste Disposal Site

    International Nuclear Information System (INIS)

    Lee, Bong Hun

    1992-04-01

    This book gives overall descriptions of technical assessment of selection of a waste disposal site, which deals with standard of selection on incinerator of city waste, the method over assessment of selection of incinerator in city waste, prerequisite of technical assessment for selection of incinerator, waste incinerator and related equipment such as form, structure, quality of material, ventilation device, plumbing system and electrical installation, and total plan like plan of construction and a measure taken against environmental pollution.

  5. Critical analysis of frameworks and approaches to assess the environmental risks of nanomaterials

    DEFF Research Database (Denmark)

    Grieger, Khara Deanne; Linkov, Igor; Hansen, Steffen Foss

    and approaches which have been developed or proposed by large organizations or regulatory bodies for NM. These frameworks and approaches were evaluated and assessed based on a select number of criteria which have been previously proposed as important parameters for inclusion in successful risk assessment......7.1.7 Critical analysis of frameworks and approaches to assess the environmental risks of nanomaterials Khara D. Grieger1, Igor Linkov2, Steffen Foss Hansen1, Anders Baun1 1Technical University of Denmark, Kgs. Lyngby, Denmark 2Environmental Laboratory, U.S. Army Corps of Engineers, Brookline, USA...... Email: kdg@env.dtu.dk Scientists, organizations, governments, and policy-makers are currently involved in reviewing, adapting, and formulating risk assessment frameworks and strategies to understand and assess the potential environmental risks of engineered nanomaterials (NM). It is becoming...

  6. A Procedural Skills OSCE: Assessing Technical and Non-Technical Skills of Internal Medicine Residents

    Science.gov (United States)

    Pugh, Debra; Hamstra, Stanley J.; Wood, Timothy J.; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges

    2015-01-01

    Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal…

  7. Risk assessment of nanomaterials and nanoproducts – adaptation of traditional approaches

    International Nuclear Information System (INIS)

    Jahnel, J; Fleischer, T; Seitz, S B

    2013-01-01

    Different approaches have been adopted for assessing the potential risks of conventional chemicals and products for human health. In general, the traditional paradigm is a toxicological-driven chemical-by-chemical approach, focusing on single toxic endpoints. Scope and responsibilities for the development and implementation of a risk assessment concept vary across sectors and areas and depends on the specific regulatory environment and the specific protection goals. Thus, risk assessment implication is a complex task based not only on science based knowledge but also on the regulatory context involving different parties and stakeholders. Questions have been raised whether standard paradigms for conventional chemicals would be applicable and adequate for new materials, products and applications of nanotechnology. Most scientists and stakeholders assume that current standard methods are in principle applicable to nanomaterials, but specific aspects require further development. The paper presents additional technical improvements like the complementary use of the life cycle methodology and the support of risk-based classification systems. But also aspects improving the utility of risk assessment with regard to societal impacts on risk governance are discussed.

  8. Current status and future expectation concerning probabilistic risk assessment of NPPs. 1. Features and issues of probabilistic risk assessment methodology

    International Nuclear Information System (INIS)

    Yamashita, Masahiro

    2012-01-01

    Probabilistic risk assessment (PRA) of Nuclear Power Plants (NPPs) could play an important role in assuring safety of NPPs. However PRA had not always effectively used, which was indicated in Japanese government's report on Fukushima Daiichi NPP accident. At the Risk Technical Committee (RTC) of Standards Committee of Atomic Energy Society of Japan, preparation of standards (implementing criteria) focusing on PRA methodology and investigation on basic philosophy for use of PRA had been in progress. Based on activities of RTC, a serial in three articles including this described current status and future expectation concerning probabilistic risk assessment of NPPs. This article introduced features and issues of PRA methodology related to the use of PRA. Features of PRA methodology could be shown as (1) systematic and comprehensive understanding of risk, (2) support of grading approach, (3) identification of effective safety upgrade measures and (4) quantitative understanding of effects of uncertainty. Issues of PRA methodology were (1) extension of PRA application area, (2) upgrade of PRA methodology, (3) quality assurance of PRA, (4) treatment of uncertainty and (5) quantitative evaluation criteria. (T. Tanaka)

  9. National report of Great Britain. Risks and risk assessment according to British legislation

    International Nuclear Information System (INIS)

    Vieweg, K.

    1980-01-01

    Who has got the competence in Great Britain to decide about criteria to be applied and methods to be taken in the prevention of damage thus ensuring the required safety standards and definine the maximum acceptable risk to be taken due to the operation of industrial and other facilities. The answer is laid down in the legal regulations covering virtually all industrial and technical installations. The author discusses the skeleton regulations of the 'Health and Safety at Work Act 1974', which is to be considered as the basis of British industrial law. Giving numerous examples, the author explains the legal status and administrative practice concerning the wide range of conventional technical facilities. Furthermore, he describes legal status and administrative practice concerning nuclear facilities and aircraft. After discussing methods of environmental pollution control, especially air pollution, the author enters into the regulations governing planning procedures of great relevance in Britain's legal practice, and the administrative procedures, shown by the example of the Windscale Inquiry. Finally, the author describes methods of risk assessment in other fields of law and some possible approaches to use risk analyses in the framework of the legal system. (orig./HSCH) [de

  10. Dynamical systems probabilistic risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Denman, Matthew R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ames, Arlo Leroy [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-03-01

    Probabilistic Risk Assessment (PRA) is the primary tool used to risk-inform nuclear power regulatory and licensing activities. Risk-informed regulations are intended to reduce inherent conservatism in regulatory metrics (e.g., allowable operating conditions and technical specifications) which are built into the regulatory framework by quantifying both the total risk profile as well as the change in the risk profile caused by an event or action (e.g., in-service inspection procedures or power uprates). Dynamical Systems (DS) analysis has been used to understand unintended time-dependent feedbacks in both industrial and organizational settings. In dynamical systems analysis, feedback loops can be characterized and studied as a function of time to describe the changes to the reliability of plant Structures, Systems and Components (SSCs). While DS has been used in many subject areas, some even within the PRA community, it has not been applied toward creating long-time horizon, dynamic PRAs (with time scales ranging between days and decades depending upon the analysis). Understanding slowly developing dynamic effects, such as wear-out, on SSC reliabilities may be instrumental in ensuring a safely and reliably operating nuclear fleet. Improving the estimation of a plant's continuously changing risk profile will allow for more meaningful risk insights, greater stakeholder confidence in risk insights, and increased operational flexibility.

  11. Probabilistic Seismic Risk Assessment in Manizales, Colombia:Quantifying Losses for Insurance Purposes

    Institute of Scientific and Technical Information of China (English)

    Mario A.Salgado-Gálvez; Gabriel A.Bernal; Daniela Zuloaga; Mabel C.Marulanda; Omar-Darío Cardona; Sebastián Henao

    2017-01-01

    A fully probabilistic seismic risk assessment was developed in Manizales,Colombia,considering assets of different types.The first type includes elements that are part of the water and sewage network,and the second type includes public and private buildings.This assessment required the development of a probabilistic seismic hazard analysis that accounts for the dynamic soil response,assembling high resolution exposure databases,and the development of damage models for different types of elements.The economic appraisal of the exposed assets was developed together with specialists of the water utilities company of Manizales and the city administration.The risk assessment was performed using several Comprehensive Approach to Probabilistic Risk Assessment modules as well as the R-System,obtaining results in terms of traditional metrics such as loss exceedance curve,average annual loss,and probable maximum loss.For the case of pipelines,repair rates were also estimated.The results for the water and sewage network were used in activities related to the expansion and maintenance strategies,as well as for the exploration of financial retention and transfer alternatives using insurance schemes based on technical,probabilistic,and prospective damage and loss estimations.In the case of the buildings,the results were used in the update of the technical premium values of the existing collective insurance scheme.

  12. Technical methods for a risk-informed, performance-based fire protection program at nuclear power plants

    International Nuclear Information System (INIS)

    Dey, M.K.

    1998-01-01

    This paper presents a technical review and examination of technical methods that are available for developing a risk-informed, performance-based fire protection program at a nuclear plant. The technical methods include ''engineering tools'' for examining the fire dynamics of fire protection problems, reliability techniques for establishing an optimal fire protection surveillance program, fire computer codes for analyzing important fire protection safety parameters, and risk-informed approaches that can range from drawing qualitative insights from risk information to quantifying the risk impact of alternative fire protection approaches. Based on this technical review and examination, it is concluded that methods for modeling fires, and reliability and fire PRA analyses are currently available to support the initial implementation of simple risk-informed, performance-based approaches in fire protection programs. (author)

  13. A National Needs Assessment to Identify Technical Procedures in Vascular Surgery for Simulation Based Training

    DEFF Research Database (Denmark)

    Nayahangan, L J; Konge, L; Schroeder, T V

    2017-01-01

    to identify technical procedures that vascular surgeons should learn. Round 2 was a survey that used a needs assessment formula to explore the frequency of procedures, the number of surgeons performing each procedure, risk and/or discomfort, and feasibility for simulation based training. Round 3 involved...... eliminated, resulting in a final prioritised list of 19 technical procedures. Conclusion A national needs assessment using a standardised Delphi method identified a list of procedures that are highly suitable and may provide the basis for future simulation based training programs for vascular surgeons......Objectives and background Practical skills training in vascular surgery is facing challenges because of an increased number of endovascular procedures and fewer open procedures, as well as a move away from the traditional principle of “learning by doing.” This change has established simulation...

  14. Survey on the Technology Readiness Level of R and D projects for a Technical Risk Management

    International Nuclear Information System (INIS)

    Song, S. J.; Chang, J.; Lee, K. Y.

    2008-01-01

    The purpose of applying the Technology Readiness Level/Design Readiness Level (TRL/DRL) in technical risk management is to make technology assessments, and improve communication among researchers with a consistent, systematic technology readiness Technical risk management for the Nuclear Hydrogen Production project was adopted of experience assessed with Delphi Method from the Next Generation Nuclear Plant(NGNP)of the DOE to improve the poor contactor management of the major projects which experienced cost increases and/or schedule delays in long-term. In the current phase that is doing key technology research and development projects, the technology readiness level was reviewed and applied to the Nuclear Hydrogen Production project to prepare an input for the next design phases. Based on the previous works, pre-conceptional design and key R and D works for the Nuclear Hydrogen Design and Development(NHDD) projects and the results of key research and development projects, the TRL was applied to assess the levels and compared with the advanced design stages of Westinghouse Electric Co. With this process, several issues were identified to apply the design and technology level to the familiar steps of design process and research and development projects. In order to resolve these issues, it is needed to systematically adjust and modify the current process with TRLs

  15. Risk impact of BWR technical specifications requirements during shutdown

    International Nuclear Information System (INIS)

    Staple, B.D.; Kirk, H.K.; Yakle, J.

    1994-10-01

    This report presents an application of probabilistic models and risk based criteria for determining the risk impact of the Limiting Conditions of Operations (LCOs) in the Technical Specifications (TSs) of a boiling water reactor during shutdown. This analysis studied the risk impact of the current requirements of Allowed Outage Times (AOTs) and Surveillance Test Intervals (STIs) in eight Plant Operational States (POSs) which encompass power operations, shutdown, and refueling. This report also discusses insights concerning TS action statements

  16. 78 FR 27235 - Technical Guidance for Assessing Environmental Justice in Regulatory Analysis

    Science.gov (United States)

    2013-05-09

    ... Justice in Regulatory Analysis.'' The purpose of this guidance is to provide EPA analysts with technical...-566-2363. Mail: Technical Guidance for Assessing Environmental Justice in Regulatory Analysis... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OA-2013-0320; FRL-9810-5] Technical Guidance for Assessing...

  17. A methodology for reviewing Probabilistic Risk Assessments

    International Nuclear Information System (INIS)

    Derby, S.L.

    1983-01-01

    The starting point for peer review of a Probabilistic Risk Assessment (PRA) is a clear understanding of how the risk estimate was prepared and of what contributions dominate the calculation. The problem facing the reviewers is how to cut through the complex details of a PRA to gain this understanding. This paper presents a structured, analytical procedure that solves this problem. The effectiveness of this solution is demonstrated by an application on the Zion Probabilistic Safety Study. The procedure found the three dominant initiating events and provided a simplified reconstruction of the calculation of the risk estimate. Significant assessments of uncertainty were also identified. If peer review disputes the accuracy of these judgments, then the revised risk estimate could significantly increase. The value of this procedure comes from having a systematic framework for the PRA review. Practical constraints limit the time and qualified people needed for an adequate review. Having the established framework from this procedure as a starting point, reviewers can focus most of their attention on the accuracy and the completeness of the calculation. Time wasted at the start of the review is reduced by first using this procedure to sort through the technical details of the PRA and to reconstruct the risk estimate from dominant contributions

  18. Risk assessment of work at height in construction

    Directory of Open Access Journals (Sweden)

    Letice Dalla Lana

    2014-02-01

    Full Text Available The construction presents alarming statistics when it comes to the risks that these workers are subject. Higher risks still present work at a height where the fall is the biggest causal factor of fatal accidents. Thus the managements of companies who seek to reduce these risks and this has going for technical evaluation of operational risks. Three of these techniques are discussed in this article: PHA, FTA and CIT. The goal is to determine which one is most effective in assessing the risks of working at height in construction. The methodology used was case study of three works on three different construction of Santa Maria, RS. For a better understanding of the phenomenon suggests that the techniques are used together, but the CIT has provided a better quantitative analysis of incidents and the PHA contributes towards already establish the possible effects that each risk may have.

  19. Assessment of potential risk of environmental radioactive contamination in northern Europe from terrestrial nuclear units in north-west Russia

    International Nuclear Information System (INIS)

    Lisovsky, I.; Baklanov, A.; Jacovlev, V.; Prutskov, V.; Bergman, R.

    1999-05-01

    This Technical Report, being part of the INTAS project 96-1802, constitutes a comprehensive presentation - covering basic results from separate contributions as specified below - of work performed during the first period (February 1998- February 1999). The aim of the INTAS project 96-1802: 'Assessment of potential risk of environmental radioactive contamination in northern Europe from terrestrial nuclear units in north-west Russia' is to assess the potential risk of environmental radioactive contamination from nuclear units in north-west Russia and resulting impacts on population and terrestrial ecosystems in the north. The work focuses mainly on airborne radioactive contamination, but some case studies also deal with accidental leakage from terrestrial nuclear sites to soil and coastal waters. The present material comprises in more detail the contributions from participants no.4 and no.5 based on the four internal reports referred to below: (1) Assessment of potential risk of environmental radioactive contamination in Northern Europe from terrestrial nuclear units in north-west Russia: 'Determination of the list of typical sources of danger emergency radioactive releases in an environment in connection with military activity in the North of Russia.' Technical report no.1 of the team no.5. St.-Petersburg State Technical University, St.-Petersburg. July 1998. 43 p.; (2) Assessment of potential risk of environmental radioactive contamination in Northern Europe from terrestrial nuclear units in North-west Russia: 'Analysis and description of source-term characteristics for accident linked with airborne radioactive releases from Kola Nuclear Power Plant. Establishing a network facility at INEP for communication among the INTAS Project participants.' Technical report no.1 of the team no.4. Kola Science Centre, Apatity. August 1998. 56 p.; (3) Assessment of potential risk of environmental radioactive contamination in Northern Europe from terrestrial nuclear units in

  20. Assessment of potential risk of environmental radioactive contamination in northern Europe from terrestrial nuclear units in north-west Russia

    Energy Technology Data Exchange (ETDEWEB)

    Lisovsky, I. [St. Petersburg State Technical Univ. (Russian Federation); Baklanov, A. [Inst. of the Northern Ecology Problems (INEP) (Russian Federation); Jacovlev, V. [St. Petersburg State Technical Univ. (Russian Federation); Prutskov, V. [Ministry of Defence (Russian Federation). First Central Research Inst. of Naval Shipbuilding; Tarasov, I. [Ministry of Defence (Russian Federation). 23 State Marine Project Inst.; Blecher, A. [State Unitary Enterprise (Russian Federation). Research Inst. of Industrial and Marine Medicine; Zvonariev, B.; Kuchin, N.; Rubanov, S.; Sergeiev, I. [State Scientific Centre (Russian Federation). Central Research Inst. of A. Krylov; Morozov, S.; Koshkin, V.; Fedorenko, Yu.; Rigina, O. [Inst. of the Northern Ecology Problems (INEP) (Russian Federation); Bergman, R. [ed.] [Defence Research Establishment, Umeaa (Sweden). Div. of NBC Defence

    1999-05-01

    This Technical Report, being part of the INTAS project 96-1802, constitutes a comprehensive presentation - covering basic results from separate contributions as specified below - of work performed during the first period (February 1998- February 1999). The aim of the INTAS project 96-1802: `Assessment of potential risk of environmental radioactive contamination in northern Europe from terrestrial nuclear units in north-west Russia` is to assess the potential risk of environmental radioactive contamination from nuclear units in north-west Russia and resulting impacts on population and terrestrial ecosystems in the north. The work focuses mainly on airborne radioactive contamination, but some case studies also deal with accidental leakage from terrestrial nuclear sites to soil and coastal waters. The present material comprises in more detail the contributions from participants no.4 and no.5 based on the four internal reports referred to below: (1) Assessment of potential risk of environmental radioactive contamination in Northern Europe from terrestrial nuclear units in north-west Russia: `Determination of the list of typical sources of danger emergency radioactive releases in an environment in connection with military activity in the North of Russia.` Technical report no.1 of the team no.5. St.-Petersburg State Technical University, St.-Petersburg. July 1998. 43 p.; (2) Assessment of potential risk of environmental radioactive contamination in Northern Europe from terrestrial nuclear units in North-west Russia: `Analysis and description of source-term characteristics for accident linked with airborne radioactive releases from Kola Nuclear Power Plant. Establishing a network facility at INEP for communication among the INTAS Project participants.` Technical report no.1 of the team no.4. Kola Science Centre, Apatity. August 1998. 56 p.; (3) Assessment of potential risk of environmental radioactive contamination in Northern Europe from terrestrial nuclear units in

  1. Assessing reservoir performance risk in CO{sub 2} storage projects

    Energy Technology Data Exchange (ETDEWEB)

    Bowden, A.R. [URS Corp., San Francisco, CA (United States); Rigg, A. [CRC for Greenhouse Gas Technologies, Canberra (Australia)

    2005-07-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO{sub 2}) has been the development of a proper methodology to assess and compare alternative CO{sub 2} injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO{sub 2}, and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO{sub 2} injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO{sub 2} injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs.

  2. Report on probabilistic safety assessment (PSA) quality assurance in utilization of risk information

    International Nuclear Information System (INIS)

    2006-12-01

    Recently in Japan, introduction of nuclear safety regulations using risk information such as probabilistic safety assessment (PSA) has been considered and utilization of risk information in the rational and practical measures on safety assurance has made a progress to start with the operation or inspection area. The report compiled results of investigation and studies of PSA quality assurance in risk-informed activities in the USA. Relevant regulatory guide and standard review plan as well as issues and recommendations were reviewed for technical adequacy and advancement of probabilistic risk assessment technology in risk-informed decision making. Useful and important information to be referred as issues in PSA quality assurance was identified. (T. Tanaka)

  3. Handbook of methods for risk-based analysis of technical specification requirements

    International Nuclear Information System (INIS)

    Samanta, P.K.; Vesely, W.E.

    1994-01-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements were based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while others may not be conducive to safety. Improvements in these requirements are facilitated by the availability of plant specific Probabilistic Safety Assessments (PSAs). The use of risk and reliability-based methods to improve TS requirements has gained wide interest because these methods can: Quantitatively evaluate the risk and justify changes based on objective risk arguments; Provide a defensible basis for these requirements for regulatory applications. The US NRC Office of Research is sponsoring research to develop systematic risk-based methods to improve various aspects of TS requirements. The handbook of methods, which is being prepared, summarizes such risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), defenses against common-cause failures, managing plant configurations, and scheduling maintenances. For each topic, the handbook summarizes methods of analysis and data needs, outlines the insights to be gained, lists additional references, and presents examples of evaluations

  4. Handbook of methods for risk-based analysis of Technical Specification requirements

    International Nuclear Information System (INIS)

    Samanta, P.K.; Vesely, W.E.

    1993-01-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements were based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while others may not be conducive to safety. Improvements in these requirements are facilitated by the availability of plant specific Probabilistic Safety Assessments (PSAs). The use of risk and reliability-based methods to improve TS requirements has gained wide interest because these methods can: quantitatively evaluate the risk impact and justify changes based on objective risk arguments. Provide a defensible basis for these requirements for regulatory applications. The United States Nuclear Regulatory Commission (USNRC) Office of Research is sponsoring research to develop systematic risk-based methods to improve various aspects of TS requirements. The handbook of methods, which is being prepared, summarizes such risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), defenses against common-cause failures, managing plant configurations, and scheduling maintenances. For each topic, the handbook summarizes methods of analysis and data needs, outlines the insights to be gained, lists additional references, and presents examples of evaluations

  5. Implementing and Evaluating a National Certification Technical Skills Examination: The Colorectal Objective Structured Assessment of Technical Skill.

    Science.gov (United States)

    de Montbrun, Sandra; Roberts, Patricia L; Satterthwaite, Lisa; MacRae, Helen

    2016-07-01

    To implement the Colorectal Objective Structured Assessment of Technical skill (COSATS) into American Board of Colon and Rectal Surgery (ABCRS) certification and build evidence of validity for the interpretation of the scores of this high stakes assessment tool. Currently, technical skill assessment is not a formal component of board certification. With the technical demands of surgical specialties, documenting competence in technical skill at the time of certification with a valid tool is ideal. In September 2014, the COSATS was a mandatory component of ABCRS certification. Seventy candidates took the examination, with their performance evaluated by expert colorectal surgeons using a task-specific checklist, global rating scale, and overall performance scale. Passing scores were set and compared using 2 standard setting methodologies, using a compensatory and conjunctive model. Inter-rater reliability and the reliability of the pass/fail decision were calculated using Cronbach alpha and Subkoviak methodology, respectively. Overall COSATS scores and pass/fail status were compared with results on the ABCRS oral examination. The pass rate ranged from 85.7% to 90%. Inter-rater reliability (0.85) and reliability of the pass/fail decision (0.87 and 0.84) were high. A low positive correlation (r= 0.25) was seen between the COSATS and oral examination. All individuals who failed the COSATS passed the ABCRS oral examination. COSATS is the first technical skill examination used in national surgical board certification. This study suggests that the current certification process may be failing to identify individuals who have demonstrated technical deficiencies on this standardized assessment tool.

  6. Engineering measures and risk assessment against fault displacement

    International Nuclear Information System (INIS)

    Narabayashi, Tadashi; Okamoto, Koji; Dodo, Takashi; Kamiya, Masanobu

    2017-01-01

    A special committee on 'assessment on fault activities and engineering risk' was established at the Japan Atomic Energy Society. With a participation of the Japan Society of Maintenology, a study group on nuclear safety regulations was established at the Japan Society of Maintenology, and this theme has been examined. Among the technics for evaluating the effects of fault displacement on nuclear facilities, the concept of application of the safety margin evaluation method is shown. By applying this method, it is possible to evaluate nuclear safety against fault displacement, and it is also possible to obtain risk information such as the conditions of facilities and safety functions (retention or loss) as well as the safety margin against core damage, including the event exceeding prediction. Thus, it is possible to verify the effectiveness of accident management and to make decisions for further countermeasures to reduce risk through using the obtained risk information. The countermeasures prepared for large scale damage can also be effectively utilized. It is necessary not only the fault displacement targeted in this paper, but also the results of risk assessment obtained by safety margin assessment etc. are reflected on the improvement of accident management at the site, education and training, and assumption of various events and desk training, and are linked to safety improvement. Efforts for encouraging these actions are also required. (A.O.)

  7. Objective assessment of technical surgical skills

    NARCIS (Netherlands)

    van Hove, P. D.; Tuijthof, G. J. M.; Verdaasdonk, E. G. G.; Stassen, L. P. S.; Dankelman, J.

    2010-01-01

    Surgeons are increasingly being scrutinized for their performance and there is growing interest in objective assessment of technical skills. The purpose of this study was to review all evidence for these methods, in order to provide a guideline for use in clinical practice. A systematic search was

  8. Oil spill dispersants. Risk assessment for Swedish waters

    International Nuclear Information System (INIS)

    Lindgren, C.; Lager, H.; Fejes, J.

    2001-12-01

    IVL has compiled a list of the international usage of oil spill dispersants and presents the technical limitations with the use of such agents as well as the biological effects of these chemical products. IVL, has also conducted an analysis of the pros and cons to using dispersants against oil spills in waters and has applied this with a risk assessment of chemical methods to combat oil spills in the Kattegat and Skagerrak and the Baltic Sea

  9. Promise assessment: A corollary to risk assessment for characterizing benefits

    International Nuclear Information System (INIS)

    Sholtis, J.A. Jr.

    1993-01-01

    Decisions involving the use of hazardous technologies are often made based on risk-benefit considerations. This is the case for U.S. space mission use of nuclear power and propulsion systems, where launch decisions are made within the office of the President. A great deal of time and effort is spent characterizing the risk for each nuclear-powered space mission. However, this is not so for benefits, even though they are no less important. To correct this situation, a new technical term--promise--is defined, and a new methodology--promise assessment--is proposed. This paper introduces and advances this concept, addresses its future application, as a tool, can be developed sufficiently and applied to methodically identify and characterized benefits. Further, it can introduce a degree of balance when judgments concerning the use of hazardous technologies are involved

  10. Risk assessment

    International Nuclear Information System (INIS)

    Kinchin, G.H.

    1983-01-01

    After defining risk and introducing the concept of individual and societal risk, the author considers each of these, restricting considerations to risk of death. Some probabilities of death arising from various causes are quoted, and attention drawn to the care necessary in making comparisons between sets of data and to the distinction between voluntary and involuntary categories and between early and delayed deaths. The presentation of information on societal risk is discussed and examples given. The history of quantified risk assessment is outlined, particularly related to the nuclear industry, the process of assessing risk discussed: identification of hazard causes, the development of accident chains and the use of event trees, the evaluation of probability through the collection of data and their use with fault trees, and the assessment of consequences of hazards in terms of fatalities. Reference is made to the human element and common-made failures, and to studies supporting the development of reliability assessment techniques. Acceptance criteria are discussed for individual and societal risk in the nuclear field, and it is shown that proposed criteria lead to risks conservative by comparison with risks from day-to-day accidents and other potentially hazardous industries. (U.K.)

  11. Risk Assessment Overview

    Science.gov (United States)

    Prassinos, Peter G.; Lyver, John W., IV; Bui, Chinh T.

    2011-01-01

    Risk assessment is used in many industries to identify and manage risks. Initially developed for use on aeronautical and nuclear systems, risk assessment has been applied to transportation, chemical, computer, financial, and security systems among others. It is used to gain an understanding of the weaknesses or vulnerabilities in a system so modification can be made to increase operability, efficiency, and safety and to reduce failure and down-time. Risk assessment results are primary inputs to risk-informed decision making; where risk information including uncertainty is used along with other pertinent information to assist management in the decision-making process. Therefore, to be useful, a risk assessment must be directed at specific objectives. As the world embraces the globalization of trade and manufacturing, understanding the associated risk become important to decision making. Applying risk assessment techniques to a global system of development, manufacturing, and transportation can provide insight into how the system can fail, the likelihood of system failure and the consequences of system failure. The risk assessment can identify those elements that contribute most to risk and identify measures to prevent and mitigate failures, disruptions, and damaging outcomes. In addition, risk associated with public and environment impact can be identified. The risk insights gained can be applied to making decisions concerning suitable development and manufacturing locations, supply chains, and transportation strategies. While risk assessment has been mostly applied to mechanical and electrical systems, the concepts and techniques can be applied across other systems and activities. This paper provides a basic overview of the development of a risk assessment.

  12. Ecotoxicological risk assessment linked to infilling quarries with treated dredged seaport sediments.

    Science.gov (United States)

    Perrodin, Yves; Donguy, Gilles; Bazin, Christine; Volatier, Laurence; Durrieu, Claude; Bony, Sylvie; Devaux, Alain; Abdelghafour, Mohammed; Moretto, Robert

    2012-08-01

    The dredged sediments of polluted seaports now raise complex management problems since it is no longer possible to discharge them into the sea. This results in the need to manage them on land, raising other types of technical, economic and environmental problems. Regarding the technical and economic dimensions, traditional waste treatment methods have proved to be poorly adapted, due to very high costs and low absorbable volumes. In this context, filling quarries in coastal areas with treated sediments could represent an interesting alternative for these materials. Nevertheless, for the environmental dimension, it is necessary to demonstrate that this possibility is harmless to inland ecosystems. Consequently, a specific ecotoxicological risk assessment methodology has been formulated and tested on three sediments taken from seaboards of France, in view to providing an operational and usable tool for the prior validation of any operation to fill quarries with treated seaport sediments. This method incorporates the formulation of a global conceptual model of the scenario studied and the definition of protocols for each of its steps: the characterisation of exposures (based on a simulation of sediment deposit), the characterisation of effects (via the study of sediments ecotoxicity), and the final ecotoxicological risk assessment performed as a calculation of a risk quotient. It includes the implementation in parallel of two types of complementary approach: the "substances" approach derived from the European methodology for assessing new substances placed on the market, and the "matrix" approach which is similar to methods developed in France to assess ecological risks in other domains (waste management, polluted site management, …). The application of this dual approach to the three sediments tested led to conclude with reliability that the project to deposit sediments "1" and "2" presented a low risk for the peripheral aquatic ecosystems while sediment "3

  13. Introduction to risk assessment

    International Nuclear Information System (INIS)

    Raina, V.M.

    2002-01-01

    This paper gives an introduction to risk assessment. It discusses the basic concepts of risk assessment, nuclear risk assessment process and products, the role of risk assessment products in nuclear safety assurance, the relationship between risk assessment and other safety analysis and risk assessment and safe operating envelope

  14. Non-technical skills assessment for prelicensure nursing students: An integrative review.

    Science.gov (United States)

    Pires, Sara; Monteiro, Sara; Pereira, Anabela; Chaló, Daniela; Melo, Elsa; Rodrigues, Alexandre

    2017-11-01

    In nursing, non-technical skills are recognized as playing an important role to increase patient safety and successful clinical outcomes (Pearson and McLafferty, 2011). Non-technical skills are cognitive and social resource skills that complement technical skills and contribute to safe and efficient task performance (Flin et al., 2008). In order to effectively provide non-technical skills training, it is essential to have an instrument to measure these skills. An online search was conducted. Articles were selected if they referred to and/or described instruments assessing non-technical skills for nurses and/or prelicensure nursing students in educational, clinical and/or simulated settings with validation evidence (inclusion criteria). Of the 53 articles located, 26 met the inclusion criteria. Those referred to and/or described 16 instruments with validation evidence developed to assess non-technical skills in multidisciplinary teams including nurses. Although articles have shown 16 valid and reliable instruments, to our knowledge, no instrument has been published or developed and validated for the assessment of non-technical skills of only nurses in general, relevant for use in high-fidelity simulation-based training for prelicensure nursing students. Therefore, there is a need for the development of such an instrument. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. Draft CSA standard on environmental risk assessments at class I nuclear facilities and uranium mines and mills

    International Nuclear Information System (INIS)

    Hart, D.; Garisto, N.; Parker, R.; Kovacs, R.; Thompson, B.

    2012-01-01

    The Canadian Standards Association (CSA) is preparing a draft Standard on environmental risk assessments (ERAs) at Class I nuclear facilities and uranium mines and mills (CSA N288.6). It is being prepared by a technical subcommittee of the CSA N288 Technical Committee, including experts from across the nuclear industry, government and regulatory authorities, and environmental service providers, among others. It addresses the design, implementation, and management of environmental risk assessment programs, and is intended to standardize practice across the industry. This paper outlines the scope of the draft Standard and highlights key features. It is under development and subject to change. (author)

  16. Resistance risk assessment within herbicide authorisation--a call for sensitivity data.

    Science.gov (United States)

    Ulber, Lena; Nordmeyer, Henning; Zwerger, Peter

    2013-02-01

    In most European countries, the risk of herbicide resistance is assessed as part of the authorisation of herbicides in accordance with EPPO Standard PP 1/213(2). Because the susceptibility of weed populations to a certain herbicide may vary greatly, one part of resistance risk assessment is the testing for sensitivity variation among different populations of target weed species with a high resistance risk. This paper emphasises the importance of sensitivity data provision with regard to the recent EU Regulation (EC) 1107/2009 concerning the placing of plant protection products on the market and outlines the main technical requirements for sensitivity data. A useful principle is that sensitivity data should be provided for all herbicides with a high resistance risk regardless of whether resistance has already evolved against the herbicidal substance. Methodical details regarding the generation of sensitivity data are discussed, together with remaining questions that will need to be addressed if a harmonised assessment of herbicide resistance risk is to be achieved. Copyright © 2012 Society of Chemical Industry.

  17. A framework for assessing ecological risks of petroleum-derived materials in soil

    International Nuclear Information System (INIS)

    Suter, G.W. II

    1997-05-01

    Ecological risk assessment estimates the nature and likelihood of effects of human actions on nonhuman organisms, populations, and ecosystems. It is intended to be clearer and more rigorous in its approach to estimation of effects and uncertainties than previously employed methods of ecological assessment. Ecological risk assessment is characterized by a standard paradigm that includes problem formulation, analysis of exposure and effects, risk characterization, and communication with a risk manager. This report provides a framework that applies the paradigm to the specific problem of assessing the ecological risks of petroleum in soil. This type of approach requires that assessments be performed in phases: (1) a scoping assessment to determine whether there is a potential route of exposure for potentially significant ecological receptors; (2) a screening assessment to determine whether exposures could potentially reach toxic levels; and (3) a definitive assessment to estimate the nature, magnitude, and extent of risks. The principal technical issue addressed is the chemically complex nature of petroleum--a complexity that may be dealt with by assessing risks on the basis of properties of the whole material, properties of individual chemicals that are representative of chemical classes, distributions of properties of the constituents of chemical classes, properties of chemicals detected in the soil, and properties of indicator chemicals. The advantages and feasibility of these alternatives are discussed. The report concludes with research recommendations for improving each stage in the assessment process

  18. Cumulative Risk Assessment (CRA): transforming the way we assess health risks.

    Science.gov (United States)

    Williams, Pamela R D; Dotson, G Scott; Maier, Andrew

    2012-10-16

    Human health risk assessments continue to evolve and now focus on the need for cumulative risk assessment (CRA). CRA involves assessing the combined risk from coexposure to multiple chemical and nonchemical stressors for varying health effects. CRAs are broader in scope than traditional chemical risk assessments because they allow for a more comprehensive evaluation of the interaction between different stressors and their combined impact on human health. Future directions of CRA include greater emphasis on local-level community-based assessments; integrating environmental, occupational, community, and individual risk factors; and identifying and implementing common frameworks and risk metrics for incorporating multiple stressors.

  19. Obsolescence Risk Assessment Process Best Practice

    Science.gov (United States)

    Romero Rojo, F. J.; Roy, R.; Kelly, S.

    2012-05-01

    A component becomes obsolete when it is no longer available from the original manufacturer to the original specification. In long-lifecycle projects, obsolescence has become a major problem as it prevents the maintenance of the system. This is the reason why obsolescence management is now an essential part of the product support activities in sectors such as defence, aerospace, nuclear and railway; where systems need to be supported for several decades. The obsolescence risk assessment for the bill of materials (BoM) is a paramount activity in order to manage obsolescence proactively and cost-effectively. This is the reason why it was necessary to undertake a benchmarking study to develop best practice in this process. A total of 22 obsolescence experts from 13 different organisations/projects from across UK and USA have participated in this study. Their current processes and experience have been taken into account in the development of the best practice process for obsolescence risk assessment. The key factors that have to be analysed in the risk assessment process for each component in the BoM are: number of manufacturers, years to end of life, stock available, consumption rate and operational impact criticality. For the very high risk components, a more detailed analysis is required to inform the decisions regarding the most suitable mitigation strategies. On the contrary, for the low risk components, a fully proactive approach is neither appropriate nor cost effective. Therefore, it is advised for these components that obsolescence issues are dealt with reactively. This process has been validated using case studies with several experts from industry and is currently being implemented by the UK Ministry of Defence as technical guidance within the JSP 886 Volume 7 Part 8.13 standards.

  20. Obsolescence Risk Assessment Process Best Practice

    International Nuclear Information System (INIS)

    Rojo, F J Romero; Roy, R; Kelly, S

    2012-01-01

    A component becomes obsolete when it is no longer available from the original manufacturer to the original specification. In long-lifecycle projects, obsolescence has become a major problem as it prevents the maintenance of the system. This is the reason why obsolescence management is now an essential part of the product support activities in sectors such as defence, aerospace, nuclear and railway; where systems need to be supported for several decades. The obsolescence risk assessment for the bill of materials (BoM) is a paramount activity in order to manage obsolescence proactively and cost-effectively. This is the reason why it was necessary to undertake a benchmarking study to develop best practice in this process. A total of 22 obsolescence experts from 13 different organisations/projects from across UK and USA have participated in this study. Their current processes and experience have been taken into account in the development of the best practice process for obsolescence risk assessment. The key factors that have to be analysed in the risk assessment process for each component in the BoM are: number of manufacturers, years to end of life, stock available, consumption rate and operational impact criticality. For the very high risk components, a more detailed analysis is required to inform the decisions regarding the most suitable mitigation strategies. On the contrary, for the low risk components, a fully proactive approach is neither appropriate nor cost effective. Therefore, it is advised for these components that obsolescence issues are dealt with reactively. This process has been validated using case studies with several experts from industry and is currently being implemented by the UK Ministry of Defence as technical guidance within the JSP 886 Volume 7 Part 8.13 standards.

  1. Risks from electricity generation systems in the far future. Proceedings of a technical committee meeting on approaches for estimating and comparing risks from energy systems in the far future. Working material

    International Nuclear Information System (INIS)

    1998-01-01

    Comparative risk assessment of the health and environmental impacts of electricity generation systems can be used for providing information for decisions concerning choice of electricity generation systems and regulation of the systems. Since the beginning of 1990s, there have been several major studies of comparative risk assessment that have advanced the methodology and knowledge for the assessment of health and environmental impacts of electricity production systems. In those studies, many methodological issues were identified, and it was found that one of the major issues that influenced the results was the time period included in the risk assessment. In the results of recent studies, the impacts for long time periods are influential because of the accumulation of the impacts for more than 100 years and the large uncertainties in the estimations. Examples of such long term impacts are those from global climate change and potential impacts from radionuclides ad non-radioactive pollutants originating from nuclear and other electricity generation systems. It is generally expected that the estimates for longer term impacts have greater uncertainty. In order to enhance the comparative risk studies and the application of the results, the methodology and key issues for estimating the impacts for future :generations should be investigated, and approaches for the assessments should be established. In this connection, the IAEA Technical Committee Meeting TCM on Approaches for Estimating and Comparing Risks from Energy Systems in the Far Future was held at the IAEA Headquarters in Vienna, Austria, from 6 to 10 October 1997. This material contains the proceedings of the TCM held in October 1997, and the latest draft of the technical report, Long-Term Risks from Electricity Generation Systems

  2. Implantation of Right Kidneys: Is the Risk of Technical Graft Loss Real?

    Science.gov (United States)

    Khan, Taqi T; Ahmad, Nadeem; Siddique, Kashif; Fourtounas, Konstantinos

    2018-05-01

    The left kidney (LK) is preferred by transplant surgeons, because its vein is always of good length and has a thick wall that enables safe suturing. On the other hand, the right renal vein is generally shorter and thinner walled, and well known for its technical difficulty during venous anastomosis, and can result in graft loss. We examined our living (LD) and deceased donor (DD) recipient data and compared the incidence of technical graft loss and early graft function in right and left kidneys. A cohort of 58 adult and pediatric recipients received an LD or DD kidney between January 2015 and December 2016. The donor and recipient data were retrieved and retrospectively analyzed. Technical graft loss was defined as graft thrombosis within the 7 days after transplant. Right kidneys (RKs) were not a risk factor for technical graft loss, and no graft was lost for technical reasons in either LD or DD transplants. Early graft function in LK and RKs was also comparable in the LD cohort, and there were no LKs in the DD cohort. Based on our data, the use of RKs was not a risk factor for technical graft loss and early graft function was comparable to LKs.

  3. Are general surgeons able to accurately self-assess their level of technical skills?

    Science.gov (United States)

    Rizan, C; Ansell, J; Tilston, T W; Warren, N; Torkington, J

    2015-11-01

    Self-assessment is a way of improving technical capabilities without the need for trainer feedback. It can identify areas for improvement and promote professional medical development. The aim of this review was to identify whether self-assessment is an accurate form of technical skills appraisal in general surgery. The PubMed, MEDLINE(®), Embase(™) and Cochrane databases were searched for studies assessing the reliability of self-assessment of technical skills in general surgery. For each study, we recorded the skills assessed and the evaluation methods used. Common endpoints between studies were compared to provide recommendations based on the levels of evidence. Twelve studies met the inclusion criteria from 22,292 initial papers. There was no level 1 evidence published. All papers compared the correlation between self-appraisal versus an expert score but differed in the technical skills assessment and the evaluation tools used. The accuracy of self-assessment improved with increasing experience (level 2 recommendation), age (level 3 recommendation) and the use of video playback (level 3 recommendation). Accuracy was reduced by stressful learning environments (level 2 recommendation), lack of familiarity with assessment tools (level 3 recommendation) and in advanced surgical procedures (level 3 recommendation). Evidence exists to support the reliability of self-assessment of technical skills in general surgery. Several variables have been shown to affect the accuracy of self-assessment of technical skills. Future work should focus on evaluating the reliability of self-assessment during live operating procedures.

  4. McKenzie River Subbasin Assessment, Technical Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Alsea Geospatial, Inc.

    2000-02-01

    This document details the findings of the McKenzie River Subbasin Assessment team. The goal of the subbasin assessment is to provide an ecological assessment of the McKenzie River Floodplain, identification of conservation and restoration opportunities, and discussion of the influence of some upstream actions and processes. This Technical Report can be viewed in conjunction with the McKenzie River Subbasin Summary or as a stand-alone document. The purpose of the technical report is to detail the methodology and findings of the consulting team that the observations and recommendations in the summary document are based on. This part, Part I, provides an introduction to the subbasin and a general overview. Part II details the specific findings of the science team. Part III provides an explanation and examples of how to use the data that has been developed through this assessment to aid in prioritizing restoration activities. Part III also includes the literature cited and appendices.

  5. Promotion of technical harmonisation on risk-based decision making

    International Nuclear Information System (INIS)

    Kirchsteiger, Christian; Cojazzi, Giacomo

    2000-01-01

    The EC-JRC International Workshop on Promotion of Technical Harmonisation on Risk-Based Decision Making, held at Stresa and Ispra, Italy, 22-25 May 2000, was an experts meeting to discuss the possible need of developing an internationally accepted generic 'standard' for risk-based decision making.This paper briefly describes the workshop background, its organisation and summarises its main results and conclusions; it reflects the personal opinions of the authors and in no way commits the European Commission. (author)

  6. Technical monitoring and economical assessment of the micro-financed solar program in Bangladesh

    Energy Technology Data Exchange (ETDEWEB)

    Wiese, Rafael [PSE AG, Freiburg (Germany); Steidl, Michael [Micro Service Consult GmbH, Frankenthal (Germany)

    2011-07-01

    The Solar Home System (SHS) dissemination program in Bangladesh is considered to be one of the most successful programs of its kind worldwide. Between 2005 and 2010 nearly 750,000 SHS have been installed, the vast majority is at 50 Wp. Systems have been implemented in rural areas where grid electricity supply is neither available nor envisaged in the mid-term future. Supported by international grants and soft loans, monthly installation rates have increased to over 30,000 SHS. The program management responsibility lies with the Infrastructure Development Company Limited (IDCOL). Around 20 micro-finance institutions (MFI) are responsible for the technical and financial implementation. They provide micro-financing to enable their customers to purchase the SHS. The authors carried out a technical monitoring of more than 5.000 SHS since 2007. In general it was found that nearly all systems are operational and only 7% had technical problems which required immediate repairs to prevent technical failure of the SHS. The main problems in this category were damages to or bypassing of the charge controller. The authors also assessed the financial performance of the MFIs. As a result, measures for credit risk management were introduced which have strengthen the financial performance. (orig.)

  7. Application and problems of probability methods in technical safety assessment in the field of nuclear engineering and other technologies

    International Nuclear Information System (INIS)

    Heuser, F.W.

    1980-01-01

    On the basis of a deterministic safety concept that has been developed in nuclear engineering, approaches for a probabilistic interpretation of existing safety requirements and for a further risk assessment are described. The procedures in technical reliability analysis and its application in nuclear engineering are discussed. By the example of a reliability analysis for a reactor protection system the author discusses the question as to what extent methods of reliability analysis can be used to interpret deterministically derived safety requirements. The the author gives a survey of the current value and application of probabilistic reliability assessments in non-nuclear technology. The last part of this report deals with methods of risk analysis and its use for safety assessment in nuclear engineering. On the basis of WASH 1,400 the most important phases and tasks of research work in risk assessment are explained, showing the basic criteria and the methods to be applied in risk analysis. (orig./HSCH) [de

  8. Taking risk assessment and management to the next level - 59395

    International Nuclear Information System (INIS)

    Nelson, Jerel; Morton, Russel Lee; Castillo, Carlos; Dyer, George; Johnson, Natalie; McSwain, James T.; Kruskall, Gary Nick

    2012-01-01

    Document available in abstract form only. Full text of publication follows: A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell into two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact

  9. Operational risk assessment.

    Science.gov (United States)

    McKim, Vicky L

    2017-06-01

    In the world of risk management, which encompasses the business continuity disciplines, many types of risk require evaluation. Financial risk is most often the primary focus, followed by product and market risks. Another critical area, which typically lacks a thorough review or may be overlooked, is operational risk. This category encompasses many risk exposure types including those around building structures and systems, environmental issues, nature, neighbours, clients, regulatory compliance, network, data security and so on. At times, insurance carriers will assess internal hazards, but seldom do these assessments include more than a cursory look at other types of operational risk. In heavily regulated environments, risk assessments are required but may not always include thorough assessments of operational exposures. Vulnerabilities may linger or go unnoticed, only to become the catalyst for a business disruption at a later time, some of which are so severe that business recovery becomes nearly impossible. Businesses may suffer loss of clients as the result of a prolonged disruption of services. Comprehensive operational risk assessments can assist in identifying such vulnerabilities, exposures and threats so that the risk can be minimised or removed. This paper lays out how an assessment of this type can be successfully conducted.

  10. Landslide risk assessment and landslide disaster risk management: on the missing link between scientific knowledge, decision making and practice (Sergey Soloviev Medal Lecture)

    Science.gov (United States)

    Alcántara-Ayala, Irasema

    2016-04-01

    Different investigations have been developed to address the uncertainty and quality evaluations leading to improve landslide hazard and risk assessment. With no doubt, and by using a wide range of scientific and technical approaches, they have contributed to a major extent to the understanding of the dynamics of landslide processes at different scales. Nonetheless, in a similar fashion than other hazards, it has been rather difficult to assess in a precise manner the multi-dimensions of their associated vulnerability and what is more, to effectively link risk assessments with disaster risk management. Owing to the double-character of landslide events, as natural and socio-natural hazards, mass movements turn out to be very complex processes, as their occurrence is also enhanced by population growth, socio-economic inequality, urbanization processes, land-degradation, unsustainable practices and mounting hazard exposure. Disaster Risk Management rope in the actions to attain Disaster Risk Reduction. The latter aims at decreasing existing hazard, vulnerability, and exposure, in addition to strengthening resilience, and very importantly, avoiding the construction of future disaster risk (UNISDR, 2015a). More specifically, and along the same line of ideas, the new-fangled Sendai Framework for Disaster Risk Reduction (SFDRR) 2015-2030 (UNISDR, 2015b) points towards reducing disaster risk and losses by engaging in a series of actions at local, national and global levels. Among them and of utterly significance are those initiatives related to the need of moving from risk assessment into disaster risk management. Consequently, and beyond championing scientific and technical capacity to strengthen landslide knowledge to assess vulnerability, hazard exposure and disaster risks, the challenge remains in the realm of promoting and improving permanent communication, dialogue and partnership among the science and technology communities, policymakers and other stakeholders

  11. Opening remarks: regulatory initiatives toward improved technical specifications

    International Nuclear Information System (INIS)

    Edison, G.E.

    1985-01-01

    In order to deal with the numerous problems that have evolved over the years with nuclear power plant technical specifications, the Nuclear Regulatory Commission has undertaken some initiatives for improvement: 1) new operating licenses, 2) change to existing operating reactor technical specifications, 3) a broad-scoped reconsideration of the content of technical specifications, and 4) rule changes. It is believed that reliability and risk assessment techniques can be used in conjunction with manufacturer's recommendations and engineering judgment to better define the appropriate scope and depth for technical specification resulting in focusing attention on high risk-worth systems and avoidance of plant shutdown transients both intentionally and unintentionally through provisions of technical specifications

  12. Final report on a study of coherence in acceptability criteria for the technical aspects of risks associated with potentially hazardous installations

    International Nuclear Information System (INIS)

    Chicken, J.C.

    1988-01-01

    This report describes the results of the study that was made, under Contract No ECI-1390-B7221-85D, for the European Atomic Energy Community. The aim of the study was to examine and assess the feasibility of developing coherent and uniform criteria for judging the acceptability of the technical aspects of the risks associated with potentially hazardous installations. The report is arranged in five main parts. First the nature of hazardous installations is considered and this provides the basis for examination of the currently-used technical risk acceptability criteria. Next, the possible forms of criteria are explored and then universally consistent partial and overall technical risk acceptability criteria are proposed. Following this the implications of using the criteria proposed at the design, regulatory and operating levels are examined. Then, by testing the criteria against some real decisions, the practical problems of using the proposed criteria are explored. This leads to consideration of possible alternatives to the proposed criteria. Finally the conclusions that appear to be justified are summarized and the need for further work is identified

  13. Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jeffrey C. JOe; Ronald L. Boring

    2014-06-01

    Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understand from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.

  14. Evaluating structured assessment of anaesthesiologists' non-technical skills

    DEFF Research Database (Denmark)

    Jepsen, R M H G; Dieckmann, P; Spanager, L

    2016-01-01

    BACKGROUND: Non-technical skills (NTS) are essential for safe and efficient anaesthesia. Assessment instruments with appropriate validity evidence can be used to ensure that anaesthesiologists possess the NTS necessary to deliver high-standard patient care. The aims were to collect validity...... evidence using a contemporary validity framework for the assessment instrument Anaesthesiologists' Non-Technical Skills in Denmark (ANTSdk) regarding response process and internal structure (including reliability), and to investigate the effect of rater training on these properties. METHODS: An explorative...... study was undertaken at the Danish Institute for Medical Simulation, Copenhagen, Denmark. In a 1-day session, using ANTSdk, a convenience sample of 19 anaesthesiologists rated trainee anaesthesiologists' NTS in nine video-recorded simulation scenarios before and after a 3-h training session. RESULTS...

  15. Hepatitis Risk Assessment

    Science.gov (United States)

    ... please visit this page: About CDC.gov . Hepatitis Risk Assessment Recommend on Facebook Tweet Share Compartir Viral Hepatitis. Are you at risk? Take this 5 minute Hepatitis Risk Assessment developed ...

  16. The responsibility of technology. Weighting goods - risk assessment - codes of conduct

    International Nuclear Information System (INIS)

    Lenk, H.; Maring, M.

    1991-01-01

    Under the heading 'The responsibility of technology' nineteen authors contribute to the following topics: Basic questions of weighting 'goods' relating to resources, the relationship of technical possibilities and (self)restraint of individuals and collectives, striving for knowledge and appropriate limits, possibilities of directing and influencing technology and questions concerning (the limits of) individual and collective responsibility. Dealt with in more detail are: The assessment of technical risks and uncertainties from an ethical and legal point of view, problems in nuclear research and technology illustrated by the example of Chernobyl, information technology, and the influence of the press when presenting technology matters. (orig./HSCH) [de

  17. GM Risk Assessment

    Science.gov (United States)

    Sparrow, Penny A. C.

    GM risk assessments play an important role in the decision-making process surrounding the regulation, notification and permission to handle Genetically Modified Organisms (GMOs). Ultimately the role of a GM risk assessment will be to ensure the safe handling and containment of the GMO; and to assess any potential impacts on the environment and human health. A risk assessment should answer all ‘what if’ scenarios, based on scientific evidence.

  18. Environmental carcinogenic agents and cancer prevention. Risk assessment and management

    International Nuclear Information System (INIS)

    Tsugane, Shoichiro

    2013-01-01

    Many agents in our environment have been established as being carcinogenic, and in most cases, the carcinogenic properties of these agents were identified because of high-dose occupational or accidental exposure. Risk characterization, taking into account the dose-response relationship, and exposure assessment are essential for risk assessment and subsequent cancer prevention. Based on scientific risk assessment, risk management should be conducted practically by considering the economic, social, political, and other technical issues and by balancing the risks and benefits. Asbestos and environmental tobacco smoke are typical examples of established carcinogenic agents in the general environment, contributing to low-dose exposure. Further epidemiological studies are required to investigate the carcinogenicity of low-dose exposure to known carcinogenic agents such as arsenic and cadmium through dietary intake, radiation via medical and natural exposure, and air pollution due to diesel exhaust. In contrast, occupational chemical exposure to 1,2-dichloropropane and/or dichloromethane, whose carcinogenicity had not been established, was suggested to cause cholangiocarcinoma among workers involved in offset color proof-printing only after a rare situation of high-dose exposure was unveiled. Continuous monitoring of unusual cancer occurrences in target populations such as workers in occupational and regional settings as well as exposure reduction to suspected carcinogenic agents to levels as low as reasonably achievable is essential for reducing the risk of cancer due to environmental carcinogens. (author)

  19. Geology and assessment of the undiscovered, technically recoverable petroleum resources of Armenia, 2013

    Science.gov (United States)

    Klett, T.R.

    2016-02-23

    The U.S. Geological Survey (USGS) assessed the undiscovered, technically recoverable oil and gas resources of Armenia in 2013. A Paleozoic and a Cenozoic total petroleum system (TPS) were identified within the country of Armenia. The postulated petroleum system elements are uncertain, resulting in low geologic probabilities for significant oil an gas resources. Two assessment units (AU) were delineated in each TPS—a Paleozoic-Sourced Conventional Reservoirs AU and a Permian Shale Gas AU in the Paleozoic Composite TPS and a Paleogene-Sourced Conventional Reservoirs AU and a Cenozoic Coalbed Gas AU in the Cenozoic Composite TPS. The TPS elements are largely uncertain and risked, and so only the Paleogene-Sourced Conventional Reservoirs AU was quantitatively assessed because the geologic probability is more than the threshold of 10 percent (that is, the probability of at least one conventional oil or gas accumulation of 5 million barrels of oil equivalent or greater based on postulated petroleum-system elements). The USGS estimated fully risked mean volumes of about 1 million barrels of oil (MMBO), about 6 billion cubic feet of natural gas (BCFG), and less than 1 million barrels of natural gas liquids (MMBNGL).

  20. Seismic assessment of Technical Area V (TA-V).

    Energy Technology Data Exchange (ETDEWEB)

    Medrano, Carlos S.

    2014-03-01

    The Technical Area V (TA-V) Seismic Assessment Report was commissioned as part of Sandia National Laboratories (SNL) Self Assessment Requirement per DOE O 414.1, Quality Assurance, for seismic impact on existing facilities at Technical Area-V (TA-V). SNL TA-V facilities are located on an existing Uniform Building Code (UBC) Seismic Zone IIB Site within the physical boundary of the Kirtland Air Force Base (KAFB). The document delineates a summary of the existing facilities with their safety-significant structure, system and components, identifies DOE Guidance, conceptual framework, past assessments and the present Geological and Seismic conditions. Building upon the past information and the evolution of the new seismic design criteria, the document discusses the potential impact of the new standards and provides recommendations based upon the current International Building Code (IBC) per DOE O 420.1B, Facility Safety and DOE G 420.1-2, Guide for the Mitigation of Natural Phenomena Hazards for DOE Nuclear Facilities and Non-Nuclear Facilities.

  1. Assessment of major technical hazards in the insurance business

    International Nuclear Information System (INIS)

    Huppmann, H.

    1981-01-01

    Major technical hazards are covered by means of demand premium rates and subjective corrections according to the degree of innovation and different environmental impacts. The insurer compensates remaining risks by compensatory payments or he moderates them at least in their effects. (DG) [de

  2. Annual Report: National Risk Assessment Partnership (30 September 2012)

    Energy Technology Data Exchange (ETDEWEB)

    Bromhal, Grant [National Energy Technology Lab. (NETL), Morgantown, WV (United States); Guthrie, George [National Energy Technology Lab. (NETL), Morgantown, WV (United States)

    2012-09-30

    The U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) is conducting research to advance the science and engineering knowledge base for technologies that will accelerate the business case for CO2 capture and storage, including prediction and quantification of risks that may relate to potential liabilities. As part of this effort, NETL, through its Office of Research and Development (ORD), is leading a multi-laboratory effort that leverages broad technical capabilities across the DOE complex: the National Risk Assessment Partnership (NRAP). NRAP involves five DOE national laboratories: NETL, Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), and Pacific Northwest National Laboratory (PNNL). This team is working together to develop a science-based method for quantifying the likelihood of risks (and associated potential liabilities) for CO2 storage sites. NRAP is an effort that harnesses the breadth of capabilities across the DOE National Laboratory (NL) system into a mission-focused platform that will develop the integrated science base that can be applied to risk assessment for long-term storage of CO2.

  3. Uncertainty characterization approaches for risk assessment of DBPs in drinking water: a review.

    Science.gov (United States)

    Chowdhury, Shakhawat; Champagne, Pascale; McLellan, P James

    2009-04-01

    The management of risk from disinfection by-products (DBPs) in drinking water has become a critical issue over the last three decades. The areas of concern for risk management studies include (i) human health risk from DBPs, (ii) disinfection performance, (iii) technical feasibility (maintenance, management and operation) of treatment and disinfection approaches, and (iv) cost. Human health risk assessment is typically considered to be the most important phase of the risk-based decision-making or risk management studies. The factors associated with health risk assessment and other attributes are generally prone to considerable uncertainty. Probabilistic and non-probabilistic approaches have both been employed to characterize uncertainties associated with risk assessment. The probabilistic approaches include sampling-based methods (typically Monte Carlo simulation and stratified sampling) and asymptotic (approximate) reliability analysis (first- and second-order reliability methods). Non-probabilistic approaches include interval analysis, fuzzy set theory and possibility theory. However, it is generally accepted that no single method is suitable for the entire spectrum of problems encountered in uncertainty analyses for risk assessment. Each method has its own set of advantages and limitations. In this paper, the feasibility and limitations of different uncertainty analysis approaches are outlined for risk management studies of drinking water supply systems. The findings assist in the selection of suitable approaches for uncertainty analysis in risk management studies associated with DBPs and human health risk.

  4. Assessment of Technogenic Accident Risk of Industrial Building Structures

    Science.gov (United States)

    Baiburin, D. A.; Baiburin, A. Kh

    2017-11-01

    A methodology for assessing the risk of an industrial building accident was developed taking into account the damage caused by various localization of collapse. Before the beginning of the survey of a facility technical condition, groups including the same type of building structures are selected. Further, assessment is made for the reduction in their load-carrying capacity from the strength and stability conditions taking into account defects. The characteristics of the influence of defects and structural damage on a building safety is the degree of compliance with the standards expressed by the reliability level. Reliability levels assignment is carried out on the basis of calculations, operating experience and inspection of a particular type of structure according to the formalized rules. The risk of collapse according to a separate scenario is calculated for structures that are capable and incapable of causing a progressive ossification. The results of the technique application are based on the analysis of the accident risk at the welding shop “Vysota (Height) 239” of the Chelyabinsk Pipe Rolling Plant.

  5. Ecotoxicological risk assessment linked to infilling quarries with treated dredged seaport sediments

    Energy Technology Data Exchange (ETDEWEB)

    Perrodin, Yves, E-mail: perrodin@entpe.fr [Universite de Lyon, ENTPE, CNRS, UMR 5023 LEHNA, 2 rue Maurice Audin, 69518 Vaulx-en-Velin (France); Donguy, Gilles [Universite de Lyon, ENTPE, CNRS, UMR 5023 LEHNA, 2 rue Maurice Audin, 69518 Vaulx-en-Velin (France); Bazin, Christine [INSAVALOR, 20 avenue Albert Einstein, 69621 Villeurbanne Cedex (France); Volatier, Laurence; Durrieu, Claude [Universite de Lyon, ENTPE, CNRS, UMR 5023 LEHNA, 2 rue Maurice Audin, 69518 Vaulx-en-Velin (France); Bony, Sylvie; Devaux, Alain [Universite de Lyon, ENTPE, CNRS, UMR 5023 LEHNA, 2 rue Maurice Audin, 69518 Vaulx-en-Velin (France); INRA, USC IGH, UMR LEHNA, 2, rue Maurice Audin, 69518 Vaulx-en-Velin (France); Abdelghafour, Mohammed; Moretto, Robert [INSAVALOR, 20 avenue Albert Einstein, 69621 Villeurbanne Cedex (France)

    2012-08-01

    The dredged sediments of polluted seaports now raise complex management problems since it is no longer possible to discharge them into the sea. This results in the need to manage them on land, raising other types of technical, economic and environmental problems. Regarding the technical and economic dimensions, traditional waste treatment methods have proved to be poorly adapted, due to very high costs and low absorbable volumes. In this context, filling quarries in coastal areas with treated sediments could represent an interesting alternative for these materials. Nevertheless, for the environmental dimension, it is necessary to demonstrate that this possibility is harmless to inland ecosystems. Consequently, a specific ecotoxicological risk assessment methodology has been formulated and tested on three sediments taken from seaboards of France, in view to providing an operational and usable tool for the prior validation of any operation to fill quarries with treated seaport sediments. This method incorporates the formulation of a global conceptual model of the scenario studied and the definition of protocols for each of its steps: the characterisation of exposures (based on a simulation of sediment deposit), the characterisation of effects (via the study of sediments ecotoxicity), and the final ecotoxicological risk assessment performed as a calculation of a risk quotient. It includes the implementation in parallel of two types of complementary approach: the 'substances' approach derived from the European methodology for assessing new substances placed on the market, and the 'matrix' approach which is similar to methods developed in France to assess ecological risks in other domains (waste management, polluted site management, Horizontal-Ellipsis ). The application of this dual approach to the three sediments tested led to conclude with reliability that the project to deposit sediments '1' and '2' presented a low risk for

  6. Ecotoxicological risk assessment linked to infilling quarries with treated dredged seaport sediments

    International Nuclear Information System (INIS)

    Perrodin, Yves; Donguy, Gilles; Bazin, Christine; Volatier, Laurence; Durrieu, Claude; Bony, Sylvie; Devaux, Alain; Abdelghafour, Mohammed; Moretto, Robert

    2012-01-01

    The dredged sediments of polluted seaports now raise complex management problems since it is no longer possible to discharge them into the sea. This results in the need to manage them on land, raising other types of technical, economic and environmental problems. Regarding the technical and economic dimensions, traditional waste treatment methods have proved to be poorly adapted, due to very high costs and low absorbable volumes. In this context, filling quarries in coastal areas with treated sediments could represent an interesting alternative for these materials. Nevertheless, for the environmental dimension, it is necessary to demonstrate that this possibility is harmless to inland ecosystems. Consequently, a specific ecotoxicological risk assessment methodology has been formulated and tested on three sediments taken from seaboards of France, in view to providing an operational and usable tool for the prior validation of any operation to fill quarries with treated seaport sediments. This method incorporates the formulation of a global conceptual model of the scenario studied and the definition of protocols for each of its steps: the characterisation of exposures (based on a simulation of sediment deposit), the characterisation of effects (via the study of sediments ecotoxicity), and the final ecotoxicological risk assessment performed as a calculation of a risk quotient. It includes the implementation in parallel of two types of complementary approach: the “substances” approach derived from the European methodology for assessing new substances placed on the market, and the “matrix” approach which is similar to methods developed in France to assess ecological risks in other domains (waste management, polluted site management, …). The application of this dual approach to the three sediments tested led to conclude with reliability that the project to deposit sediments “1” and “2” presented a low risk for the peripheral aquatic ecosystems while

  7. Legal precedents regarding use and defensibility of risk assessment in Federal transportation of SNF and HLW

    International Nuclear Information System (INIS)

    Bentz, E.J. Jr.; Bentz, C.B.; O'Hora, T.D.; Chen, S.Y.

    1997-01-01

    Risk assessment has become an increasingly important and essential tool in support of Federal decision-making regarding the handling, storage, disposal, and transportation of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). This paper analyzes the current statutory and regulatory framework and related legal precedents with regard to SNF and HLW transportation. The authors identify key scientific and technical issues regarding the use and defensibility of risk assessment in Federal decision-making regarding anticipated shipments

  8. Offshore risk assessment

    CERN Document Server

    Vinnem, Jan-Erik

    2014-01-01

      Offshore Risk Assessment was the first book to deal with quantified risk assessment (QRA) as applied specifically to offshore installations and operations. Risk assessment techniques have been used for more than three decades in the offshore oil and gas industry, and their use is set to expand increasingly as the industry moves into new areas and faces new challenges in older regions.   This updated and expanded third edition has been informed by a major R&D program on offshore risk assessment in Norway and summarizes research from 2006 to the present day. Rooted with a thorough discussion of risk metrics and risk analysis methodology,  subsequent chapters are devoted to analytical approaches to escalation, escape, evacuation and rescue analysis of safety and emergency systems.   Separate chapters analyze the main hazards of offshore structures: fire, explosion, collision, and falling objects as well as structural and marine hazards. Risk mitigation and control are discussed, as well as an illustrat...

  9. Defining the role of risk assessment in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) remedial investigation process at the DOE-OR

    International Nuclear Information System (INIS)

    Miller, P.D.; McGinn, C.W.; Purucker, S.T.; White, R.K.

    1994-08-01

    The risk assessment strategy that will be implemented on the Oak Ridge Reservation has been standardized to ensure consistency and technical defensibility in all risk assessment activities and is presented within this document. The strategy emphasizes using existing environmental data in screening risk analyses to aid in identifying chemicals of potential concern, operable units that could pursue a no further investigation determination, and operable units that may warrant early response actions. The screening risk analyses include a comparison of measured chemical concentrations to preliminary remediation goals, performing a most likely exposure and integration point assessment, and performing a screening ecological risk assessment. This document focuses heavily on the screening risk analyses and relies on existing U.S. Environmental Protection Agency risk assessment guidance to provide specific details on conducting baseline risk assessments. However, the document does contain a section on the baseline risk assessment process that details the exposure pathways to be evaluated on the Oak Ridge Reservation. This document will be used in conjunction with existing Martin Marietta Energy Systems, Inc. Environmental Restoration risk assessment standards, policies, procedures, and technical memoranda. The material contained herein will be periodically updated as the strategy is tried and tested and as the risk assessment methodology is revised. The primary purpose for this document is to present the proposed strategy to the Tennessee Department of Environment and Conservation and the U.S. Environmental Protection Agency, Region IV and receive concurrence or additional comments on the material presented herein

  10. The role of risk perception for risk management

    International Nuclear Information System (INIS)

    Renn, Ortwin

    1998-01-01

    Are risks social constructions of different societal actors that can be checked at best against standards of consistency, cohesion and internal conventions of deduction, but cannot claim any validity outside of the actor's logical framework? Or are technical estimates of risk representations of real hazards that can and will affect people as predicted by the statistical values, regardless of the beliefs or convictions of those who conduct the assessments? Which of the two sides one takes determines the legitimate function of risk perception for management purposes. The paper argues that both extremes, the constructivist and the realist perspective, miss the point, as risks are always mental representations of threats that are capable of claiming real losses. Over the last two decades, risk analysts have dealt with both sides of risk in an additive fashion. In times in which risk management has been under serious pressure to demonstrate effectiveness and cost-efficiency, the parallel approach of pleasing the technical elite and the public alike has lost legitimacy. In order to integrate risk assessment and perception, the paper analyses the strengths and weaknesses of each approach to risk analysis and highlights the potential contributions that the technical sciences and the social sciences can offer to risk management. Technical assessments provide the best estimate for judging the average probability of an adverse effect linked to an object or activity. First, public perception should govern the selection of criteria on which acceptability or tolerability are to be judged. Second, public input is needed to determine the trade-offs between criteria. Third, public preferences are needed to design resilient strategies for coping with remaining uncertainties. A public participation model is introduced that promises an integration of analytic knowledge and deliberative process involving those who will be affected by the respective risk

  11. Assessment of the technical viability of reactor options for plutonium disposition

    International Nuclear Information System (INIS)

    Primm, R.T. III.

    1996-01-01

    Various reactor concepts for the disposition of surplus Pu have been proposed by reactor vendors; not all have attained the same level of technical viability. Studies were performed to differentiate between reactor concepts by devising a quantitative index for technical viability. For a quantitative assessment, three issues required resolution: the definition of a technical maturity scale, the treatment of ''subjective'' factors which cannot be easily represented in a quantitative format, and the protocol for producing a single technical viability figure-of-merit for each alternative. Alternatives involving the use of foreign facilities were found to be the most technically viable

  12. Uncertainty studies and risk assessment for CO2 storage in geological formations

    International Nuclear Information System (INIS)

    Walter, Lena Sophie

    2013-01-01

    aquifers. The uncertainties on all three levels are investigated in three approaches with different focus. The concept can also be applied to CO 2 leakage or hazards related to other technologies in the subsurface such as methane storage or atomic waste disposal. In the second part of this thesis, uncertainty studies for two realistic storage formations (the pilot site Ketzin (Germany) and a realistic storage formation in the North German Basin) are performed to investigate the related uncertainties and to reduce them as much as possible. For the Ketzin site, history matching of the measurement data, is an important task for dynamic modeling and essential for future risk assessment. A systematic approach to fit the data set using inverse modeling is presented in this work. For future risk assessment for realistic sites, e.g. for the Ketzin site, the uncertainty studies and the history matching approach provide important information. Finally, CCS is discussed in the context of risk perception and the possible input of the risk assessment concept presented in this work is discussed. This work is a first attempt to connect the technical risk assessment for CO 2 storage to the social science approach for risk assessment. It is bridging the gap between engineering and social sciences by integrating the technical quantification of risk into the wider context of a comprehensive risk governance model.

  13. Nuclear risk, psychological impact and public attitudes

    International Nuclear Information System (INIS)

    Ghita, Carmen

    1998-01-01

    Research shows that the images of potential nuclear disasters that have been formed in the mind of antinuclear on public are remarkable different from the assessments put forth by many technical experts. In communicating risk, it is important for authorities to add information about risk assessments approach and its inherent scientific uncertainties. Presenting the benefits as well as the risks also can help the audience balance the issues involved in making decisions about technical risk. The paper describes the public perceptions related to nuclear risk and the risk assessment techniques valuable as communication tools. (author)

  14. Development of Risk Assessment Technology for Low Power, Shutdown and Digital I and C Systems

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Seung Cheol; Kang, Hyung Gook; Lim, Ho Gon; Park, Jin Hee; Eom, Heung Sub; Kim, Tae Woon; Ha, Jae Joo

    2005-04-15

    There are two technical areas to deal with in the project; the low power and shutdown probabilistic safety assessment (PSA), and the digital I and C PSA. The scope and contents of each area could be summarized as follows: Quality assessment of a LPSD PSA model for a Korean Standard Nuclear Power Plant (KSNP), Quality improvement of the KSNP LPSD PSA model in the following four technical areas; plant operating status (POS), initiating event analysis, determination of success criteria, accident sequence analysis, Development of the LPSD risk management technologies, Unavailability analysis of Digital safety systems such as Digital Plant Protection System (DPPS) and Digital Engineered Safety Feature Actuation System (DESFAS), Impact analysis of the digital safety systems on plant risks throughout of the digital plant risk models for evaluating core damage frequency (CDF) and large early release frequency (LERF), Study on the methodologies for treating digital-specific problems in the digital I and C PSA such as reliability of safety-critical software, common cause failure (CCF) of digital components, fault coverage, etc.

  15. Development of Risk Assessment Technology for Low Power, Shutdown and Digital I and C Systems

    International Nuclear Information System (INIS)

    Jang, Seung Cheol; Kang, Hyung Gook; Lim, Ho Gon; Park, Jin Hee; Eom, Heung Sub; Kim, Tae Woon; Ha, Jae Joo

    2005-04-01

    There are two technical areas to deal with in the project; the low power and shutdown probabilistic safety assessment (PSA), and the digital I and C PSA. The scope and contents of each area could be summarized as follows: Quality assessment of a LPSD PSA model for a Korean Standard Nuclear Power Plant (KSNP), Quality improvement of the KSNP LPSD PSA model in the following four technical areas; plant operating status (POS), initiating event analysis, determination of success criteria, accident sequence analysis, Development of the LPSD risk management technologies, Unavailability analysis of Digital safety systems such as Digital Plant Protection System (DPPS) and Digital Engineered Safety Feature Actuation System (DESFAS), Impact analysis of the digital safety systems on plant risks throughout of the digital plant risk models for evaluating core damage frequency (CDF) and large early release frequency (LERF), Study on the methodologies for treating digital-specific problems in the digital I and C PSA such as reliability of safety-critical software, common cause failure (CCF) of digital components, fault coverage, etc

  16. Technical risk and social perception

    Energy Technology Data Exchange (ETDEWEB)

    Muench, E; Renn, O

    1982-09-01

    In insurance science and natural science risks are defined as the expected extent of damages per time unit, i.e. risks are determined by empirical data representing the average number of people who incur damages in one year or one decade. In the social sciences the concept of risk is understood as the paragon of all unforeseeable consequences of an event or an action, or even plainly as the sum of things threatening our life and environment. Of course, the intuitive understanding of the concept is also of interest: what do people consider risky, how do they assess risks and how do they cope with risky situations. It is a chief task of interdisciplinary research to investigate the tension between the scientific and intuitive perception of risks and to develop political recommendations for those responsible for decision-making.

  17. Technical risk and social perception

    International Nuclear Information System (INIS)

    Muench, E.; Renn, O.

    1982-01-01

    In insurance science and natural science risks are defined as the expected extent of damages per time unit, i.e. risks are determined by empirical data representing the average number of people who incur damages in one year or one decade. In the social sciences the concept of risk is understood as the paragon of all unforeseeable consequences of an event or an action, or even plainly as the sum of things threatening our life and environment. Of course, the intuitive understanding of the concept is also of interest: what do people consider risky, how do they assess risks and how do they cope with risky situations. It is a chief task of interdisciplinary research to investigate the tension between the scientific and intuitive perception of risks and to develop political recommendations for those responsible for decision-making. (orig./UA) [de

  18. Risk-based evaluation of technical specification problems at the La Salle County Nuclear Station: Final report

    International Nuclear Information System (INIS)

    Bizzak, D.J.; Trainer, J.E.; McClymont, A.S.

    1987-06-01

    Probabilistic risk assessment (PRA) methods are used to evaluate alternatives to existing requirements for three operationally burdensome technical specifications at La Salle Nuclear Station. The study employs a decision logic to minimize the detailed analysis necessary to show compliance with given acceptance criteria; in this case, no risk increase resulting from a proposed change. The analyses provide insights to choose from among alternative options. The SOCRATES computer code was used for the probabilistic analysis. Results support a change to less frequent diesel generator testing, eliminations of one reactor scram setpoint, and establishing an allowed out-of-service time for valves in a reactor scram system. In each case, the change would result in a safety improvement

  19. NWMO transportation technical work program

    International Nuclear Information System (INIS)

    Hatton, C.

    2015-01-01

    This paper describes technical work program for the transportation nuclear waste by the Nuclear Waste Management Organization (NWMO). Transportation work program involves risk assessment which under normal conditions involves dose assessment to the worker and the public as well as consideration of transportation system routing and operations. It also involves possible accident scenarios using forensic modelling and probability analysis.

  20. NWMO transportation technical work program

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, C. [Nuclear Waste Management Organization, Toronto, ON (Canada)

    2015-07-01

    This paper describes technical work program for the transportation nuclear waste by the Nuclear Waste Management Organization (NWMO). Transportation work program involves risk assessment which under normal conditions involves dose assessment to the worker and the public as well as consideration of transportation system routing and operations. It also involves possible accident scenarios using forensic modelling and probability analysis.

  1. Track 6: safety and risk management. Plant operational risk management. Plant Configuration Risk Assessment Methodology Development for Periodic Maintenance

    International Nuclear Information System (INIS)

    Yang, Huichang; Chung, Chang Hyun; Sung, Key Yong

    2001-01-01

    the foregoing steps, the plant configuration risks should be calculated and plotted along with the time period of analysis issued. Based on the results of the effects of human factors, common cause failures, and calculation truncation levels, the sensitivity study can be performed. 6. Development of configuration risk profile: The developed risk profiles along with the time axis for the selected time period could provide insightful information on plant operation performance and the risk effectiveness of maintenance activities. From this analysis, the specific risk patterns of plant performance by the basis of operation such as technical specifications and the limiting conditions of operations might be derived, and that information can be utilized during the activities to improve plant operation. During the application of these developed methods to the Korean NPP Younggwang Unit 3, the schedules of periodic surveillance and maintenance and the reports of trouble issued between January 2000 and October 2000 were collected. Through the review of these plant operation records, the configurations that occurred during that period were derived, and the technical specifications and the in-service test procedures were considered. The risk profile is now under development. This plant configuration risk assessment methodology can be utilized in the fields of technical specification improvement, risk-informed in-service inspection and testing, and optimization of surveillance requirements such as surveillance test intervals and allowed outage times by providing risk insights for the normal plant operation. This methodology also can provide supplementary information of on-line risk monitoring and performance monitoring for maintenance rule implementation. (authors)

  2. Dutch Risk Assessment tools

    NARCIS (Netherlands)

    Venema, A.

    2015-01-01

    The ‘Risico- Inventarisatie- en Evaluatie-instrumenten’ is the name for the Dutch risk assessment (RA) tools. A RA tool can be used to perform a risk assessment including an evaluation of the identified risks. These tools were among the first online risk assessment tools developed in Europe. The

  3. Health Risk Assessment of Harmful Chemicals: Case Study in a Petrochemical Industry

    Directory of Open Access Journals (Sweden)

    M. Motovagheh

    2011-01-01

    Full Text Available Background and aims In the most chemical process industries, workers are exposed to various chemicals and working with these chemicals without considering safety and health considerations can lead to different harmful symptoms. For deciding about control measures and reducing risk to acceptable level , it is necessary to assess the health risk of exposing to harmful chemicals by aid of specific risk assessment techniques in the process industries. The purpose of this study was to assess the health risks arising from the exposures to chemicals in a petrochemical industry.  methods A simple and applied method was used for health risk assessment of chemicals in a petrochemical industry. Firstly job tasks and work process were determined and then different chemicals in each tasks identified and risk ranking was calculated in each job task by aid of hazard and exposure rate.   Results The result showed that workers are exposed to 10 chemicals including Methyl ethyl ketone, Epichlorohydrin, Sulfuric acid, Phenol, Chlorobenzene, Toluene, Isopropanol, Methylene chloride, Chlorideric Acid and Acetone during their work in plant. From these chemicals, the highest risk level was for Epichlorohydrin in the jobs of tank and utility operations and maintenance workers. The next high risk level was for Epichlorohydrin in technical inspecting and Methyl ethyl ketone in Tank and utility operations operator.     Conclusion Hazard information and monitoring data of chemical agents in the chemical industries can be used for assessing health risks from exposures to chemicals and ranking jobs by their risk level. These data can be used for resource allocation for control measures and reducing risk level to acceptable level.    

  4. Health risk assessment of dichloromethane (methylene chloride) in California ground water

    International Nuclear Information System (INIS)

    Bogen, K.T.; Hall, L.C.; Wright, K.; McKone, T.E.

    1992-01-01

    This document presents an assessment of potential health risks associated with exposure to dichloromethane (DCM) dissolved in California drinking water, focusing primarily on information relevant to a determination of potential cancer risk that may be associated with such exposures to DCM. This assessment is being provided to the California Environmental Protection Agency for the development of drinking-water standards to manage the health risks of DCM exposures. Other assessments required in the risk-management process include analyses of the technical and economic feasibilities of treating water supplies contaminated with DCM. The primary goal of this health-risk assessment is to evaluate scientifically plausible dose-response relationships for observed and potential DCM-induced cancer in order to define dose rates that can be used to establish standards that win protect members of the general public from this chronic toxicity endpoint resulting solely from groundwater-based exposures to DCM, based on information obtained from the scientific literature. The document consists of seven sections, plus one supporting appendix. Each section provides information that can be used to develop DCM drinking-water standards that will safeguard human health. Evaluation of this information in support of specific groundwater safety standards for DCM was not conducted in this report; rather, the basis for selection of alternative standards, along with a narrative description of certain key sources of underlying uncertainty, are presented for evaluation through the regulatory risk-management process

  5. State of risk assessment

    International Nuclear Information System (INIS)

    Conrad, J.

    1978-03-01

    In view of the growing importance assumed in recent years by scientific work on the calculation, quantification, evaluation and acceptance as well as behavior in the face of risks in general and more specifically, the risks of large industrial plants, the report attempts to provide a survey of the current situation, results and evaluation of this new branch of research, risk assessment. The emphasis of the report is on the basic discussion and criticism of the theoretical and methodological approaches used in the field of risk assessment (section 3). It is concerned above all with - methodical problems of determining and quantifying risks (3.1) - questions of the possibility of risk evaluation and comp arison (3.1, 3.2) - the premises of normative and empirical studies on decision making under risk (3.2, 3.3) - investigations into society's acceptance of risks involved in the introduction of new technologies (3.4) - attempts to combine various aspects of the field of risk assessment in a unified concept (3.5, 3.6, 3.7). Because risk assessment is embedded in the framework of decision theory and technology assessment, it can be implicitly evaluated at a more general level within this framework, as far as its possibilities and weaknesses of method and application are concerned (section 4). Sections 2 and 5 deal with the social context of origin and utilization of risk assessment. Finally, an attempt is made at a summary indicating the possible future development of risk assessment. (orig./HP) [de

  6. RADTRAN 6 Technical Manual

    Energy Technology Data Exchange (ETDEWEB)

    Weiner, Ruth F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Neuhauser, Karen Sieglinde [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Heames, Terence John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); O' Donnell, Brandon M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Dennis, Matthew L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-01-01

    This Technical Manual contains descriptions of the calculation models and mathematical and numerical methods used in the RADTRAN 6 computer code for transportation risk and consequence assessment. The RADTRAN 6 code combines user-supplied input data with values from an internal library of physical and radiological data to calculate the expected radiological consequences and risks associated with the transportation of radioactive material. Radiological consequences and risks are estimated with numerical models of exposure pathways, receptor populations, package behavior in accidents, and accident severity and probability.

  7. RADTRAN 6 technical manual.

    Energy Technology Data Exchange (ETDEWEB)

    Weiner, Ruth F.; Neuhauser, Karen Sieglinde; Heames, Terence John; O' Donnell, Brandon M.; Dennis, Matthew L.

    2014-01-01

    This Technical Manual contains descriptions of the calculation models and mathematical and numerical methods used in the RADTRAN 6 computer code for transportation risk and consequence assessment. The RADTRAN 6 code combines user-supplied input data with values from an internal library of physical and radiological data to calculate the expected radiological consequences and risks associated with the transportation of radioactive material. Radiological consequences and risks are estimated with numerical models of exposure pathways, receptor populations, package behavior in accidents, and accident severity and probability.

  8. Risk assessment and risk management of mycotoxins.

    Science.gov (United States)

    2012-01-01

    Risk assessment is the process of quantifying the magnitude and exposure, or probability, of a harmful effect to individuals or populations from certain agents or activities. Here, we summarize the four steps of risk assessment: hazard identification, dose-response assessment, exposure assessment, and risk characterization. Risk assessments using these principles have been conducted on the major mycotoxins (aflatoxins, fumonisins, ochratoxin A, deoxynivalenol, and zearalenone) by various regulatory agencies for the purpose of setting food safety guidelines. We critically evaluate the impact of these risk assessment parameters on the estimated global burden of the associated diseases as well as the impact of regulatory measures on food supply and international trade. Apart from the well-established risk posed by aflatoxins, many uncertainties still exist about risk assessments for the other major mycotoxins, often reflecting a lack of epidemiological data. Differences exist in the risk management strategies and in the ways different governments impose regulations and technologies to reduce levels of mycotoxins in the food-chain. Regulatory measures have very little impact on remote rural and subsistence farming communities in developing countries, in contrast to developed countries, where regulations are strictly enforced to reduce and/or remove mycotoxin contamination. However, in the absence of the relevant technologies or the necessary infrastructure, we highlight simple intervention practices to reduce mycotoxin contamination in the field and/or prevent mycotoxin formation during storage.

  9. Sustainable hydropower in Lower Mekong Countries: Technical assessment and training travel report

    Energy Technology Data Exchange (ETDEWEB)

    Hadjerioua, Boualem [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Witt, Adam M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-08-01

    The U.S. Agency for International Development (USAID), through their partnership with the U.S. Department of the Interior (DOI), requested the support of Oak Ridge National Laboratory (ORNL) to provide specialized technical assistance as part of the Smart Infrastructure for the Mekong (SIM) Program in Thailand. Introduced in July 2013 by U.S. Secretary of State John Kerry, SIM is a U.S. Government Inter-Agency program that provides Lower Mekong partner countries with targeted, demand-driven technical and scientific assistance to support environmentally sound, climate conscious and socially equitable infrastructure, clean energy development, and water resources optimization. The U.S. Government is committed to supporting sustainable economic development within the region by providing tools, best practices, technical assistance, and lessons learned for the benefit of partner countries. In response to a request from the Electricity Generating Authority of Thailand (EGAT), a SIM project was developed with two main activities: 1) to promote hydropower sustainability and efficiency through technical assessment training at two existing hydropower assets in Thailand, and 2) the design and implementation of one national and two or three regional science and policy workshops, to be co-hosted with EGAT, to build common understanding of and commitment to environmental and social safeguards for Mekong Basin hydropower projects. The U.S. Department of Energy (DOE) is leading the technical assessment (Activity 1), and has contracted ORNL to provide expert technical assistance focused on increasing efficiency at existing projects, with the goal of increasing renewable energy generation at little to no capital cost. ORNL is the leading national laboratory in hydropower analysis, with a nationally recognized and highly qualified team of scientists addressing small to large-scale systems (basin-, regional-, and national-scale) energy generation optimization analysis for DOE. The

  10. Biosafety Risk Assessment Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Caskey, Susan Adele [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Gaudioso, Jennifer M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Salerno, Reynolds Mathewson [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Wagner, Stefan M. [Public Health Agency of Canada, Winnipeg, MB (Canada). Canadian Science Centre for Human and Animal Health (CSCHAH); Shigematsu, Mika [National Inst. of Infectious Diseases (NIID), Tokyo (Japan); Risi, George [Infectious Disease Specialists, P.C, Missoula, MT (United States); Kozlovac, Joe [US Dept. of Agriculture (USDA)., Beltsville, MD (United States); Halkjaer-Knudsen, Vibeke [Statens Serum Inst., Copenhagen (Denmark); Prat, Esmeralda [Bayer CropScience, Monheim am Rhein (Germany)

    2010-10-01

    Laboratories that work with biological agents need to manage their safety risks to persons working the laboratories and the human and animal community in the surrounding areas. Biosafety guidance defines a wide variety of biosafety risk mitigation measures, which include measures which fall under the following categories: engineering controls, procedural and administrative controls, and the use of personal protective equipment; the determination of which mitigation measures should be used to address the specific laboratory risks are dependent upon a risk assessment. Ideally, a risk assessment should be conducted in a manner which is standardized and systematic which allows it to be repeatable and comparable. A risk assessment should clearly define the risk being assessed and avoid over complication.

  11. A Simplified Approach to Risk Assessment Based on System Dynamics: An Industrial Case Study.

    Science.gov (United States)

    Garbolino, Emmanuel; Chery, Jean-Pierre; Guarnieri, Franck

    2016-01-01

    Seveso plants are complex sociotechnical systems, which makes it appropriate to support any risk assessment with a model of the system. However, more often than not, this step is only partially addressed, simplified, or avoided in safety reports. At the same time, investigations have shown that the complexity of industrial systems is frequently a factor in accidents, due to interactions between their technical, human, and organizational dimensions. In order to handle both this complexity and changes in the system over time, this article proposes an original and simplified qualitative risk evaluation method based on the system dynamics theory developed by Forrester in the early 1960s. The methodology supports the development of a dynamic risk assessment framework dedicated to industrial activities. It consists of 10 complementary steps grouped into two main activities: system dynamics modeling of the sociotechnical system and risk analysis. This system dynamics risk analysis is applied to a case study of a chemical plant and provides a way to assess the technological and organizational components of safety. © 2016 Society for Risk Analysis.

  12. Outage Risk Assessment and Management (ORAM) technology to improve outage safety and economics

    International Nuclear Information System (INIS)

    Kalra, S.P.

    2004-01-01

    The Electric Power Research Institute (EPRI) has undertaken an aggressive program, called ORAM (Outage Risk Assessment and Management), to provide utilities with tools and technology to assist in managing risk during the planning and conduct of outages. The ORAM program consists of the following 6 steps: i) Perform utility surveys and visits on shutdown risk management needs, ii) Perform probabilistic shutdown safety assessments (PSSAs) to identify generic insights that can be incorporated into risk management guidelines and identify selected areas for the development of contingency actions, iii) Develop risk management guidelines (RMG's) that provide a systematic approach to the planning and conduct of outages from a safety perspective. Incorporate insights from the shutdown safety assessments and other operating experience into the RMG's. iv) Develop selected contingency actions including a thermalhydraulic tool kit to address higher risk time periods and activities identified in the shutdown safety assessments, v) Develop computer software that integrates all of the above capability into an easy to use tool for effective shutdown operation management for utilities, vi) Provide assistance in the transfer of this technology and the application of these tools. This paper briefly describes the technical approach and tools developed under EPRI's ORAM program and its applications for improving outage safety and economics. (author)

  13. Supplementary guidance for the investigation and risk-assessment of potentially contaminated sediments

    Energy Technology Data Exchange (ETDEWEB)

    Baker, K.; Spadaro, P.; Starr, J.; Thomas, J. [Arcadis, Arnhem (Netherlands); Hildenbrand, B. [Energy Institute, London (United Kingdom); Smith, J.W.N.; Dunk, M.; Grosjean, T.; De Ibarra, M.; Medve, A.; Den Haan, K.

    2013-11-15

    This report provides guidance on the investigation and assessment of potentially contaminated sediments, focusing on the inland, estuarine and coastal environments. It is designed as a complementary, technical companion document to Energy Institute and CONCAWE (2013) report 'Guidance on characterising, assessing and managing risks associated with potentially contaminated sediments' (Report E1001). It highlights a number of significant challenges associated with assessing the aquatic and water bottom environment, which means that a sediment assessment should not be undertaken lightly. Where a decision is taken to undertake a site assessment, this report promotes the use of an iterative process of Conceptual Site Model (CSM) development, data collection, data evaluation and a continuous CSM refinement, taking into account the results obtained. Risk-based assessment is described throughout the report, entailing four tiers of assessment, which progress from a qualitative assessment (Tier 0) through to a detailed cause-attribution assessment (Tier 3), in which the decrease in uncertainty in the assessment process is balanced against the increased costs and timescales with progress to a higher tier assessment. The application of this evidence-driven risk-based approach to sediment site management, including remedial control measures, should help to overcome at least some of the challenges associated with contaminants in sediment sites in Europe, and promote a sustainable approach to sediment management on a case-by-case basis.

  14. Risks, doubt, scientific and technical expert appraisement

    International Nuclear Information System (INIS)

    Decrop, G.

    1993-01-01

    In complex systems which compose modern societies, expert report is going to take an increasing place. In its usual definition, expert is justified by a superior authority, his knowledge comes from experience, he is present as a third party where he has to work. It is often forgotten two other important points, connected with the situation: it is a tangling of technical or natural systems with a social system and above all there is a risk of uncertainty. Then, the job of expert is different from scientific work done in laboratories and different from operational work done by engineers

  15. Crowd-sourced assessment of technical skills: an opportunity for improvement in the assessment of laparoscopic surgical skills.

    Science.gov (United States)

    Deal, Shanley B; Lendvay, Thomas S; Haque, Mohamad I; Brand, Timothy; Comstock, Bryan; Warren, Justin; Alseidi, Adnan

    2016-02-01

    Objective, unbiased assessment of surgical skills remains a challenge in surgical education. We sought to evaluate the feasibility and reliability of Crowd-Sourced Assessment of Technical Skills. Seven volunteer general surgery interns were given time for training and then testing, on laparoscopic peg transfer, precision cutting, and intracorporeal knot-tying. Six faculty experts (FEs) and 203 Amazon.com Mechanical Turk crowd workers (CWs) evaluated 21 deidentified video clips using the Global Objective Assessment of Laparoscopic Skills validated rating instrument. Within 19 hours and 15 minutes we received 662 eligible ratings from 203 CWs and 126 ratings from 6 FEs over 10 days. FE video ratings were of borderline internal consistency (Krippendorff's alpha = .55). FE ratings were highly correlated with CW ratings (Pearson's correlation coefficient = .78, P Assessment of Technical Skills as a reliable, basic tool to standardize the evaluation of technical skills in general surgery. Copyright © 2016 Elsevier Inc. All rights reserved.

  16. 2007 TOXICOLOGY AND RISK ASSESSMENT ...

    Science.gov (United States)

    EPA has announced The 2007 Toxicology and Risk Assessment Conference Cincinnati Marriott North, West Chester (Cincinnati), OHApril 23- 26, 2007 - Click to register!The Annual Toxicology and Risk Assessment Conference is a unique meeting where several Government Agencies come together to discuss toxicology and risk assessment issues that are not only of concern to the government, but also to a broader audience including academia and industry. The theme of this year's conference is Emerging Issues and Challenges in Risk Assessment and the preliminary agenda includes: Plenary Sessions and prominent speakers (tentative) include: Issues of Emerging Chemical ContaminantsUncertainty and Variability in Risk Assessment Use of Mechanistic data in IARC evaluationsParallel Sessions:Uncertainty and Variability in Dose-Response Assessment Recent Advances in Toxicity and Risk Assessment of RDX The Use of Epidemiologic Data for Risk Assessment Applications Cumulative Health Risk Assessment:

  17. Risk Assessment

    Science.gov (United States)

    How the EPA conducts risk assessment to protect human health and the environment. Several assessments are included with the guidelines, models, databases, state-based RSL Tables, local contacts and framework documents used to perform these assessments.

  18. ATEX explosive atmospheres : risk assessment, control and compliance

    CERN Document Server

    Jespen, Torben

    2016-01-01

    This book details how safety (i.e. the absence of unacceptable risks) is ensured in areas where potentially explosive atmospheres (ATEX) can arise. The book also offers readers essential information on how to comply with the newest (April 2016) EU legislation when the presence of ATEX cannot be avoided. By presenting general guidance on issues arising out of the EU ATEX legislation – especially on zone classification, explosion risk assessment, equipment categorization, Ex-marking and related technical/chemical aspects – the book provides equipment manufacturers, responsible employers, and others with the essential knowledge they need to be able to understand the different – and often complicated – aspects of ATEX and to implement the necessary safety precautions. As such, it represents a valuable resource for all those concerned with maintaining high levels of safety in ATEX environments.

  19. Exploration Health Risks: Probabilistic Risk Assessment

    Science.gov (United States)

    Rhatigan, Jennifer; Charles, John; Hayes, Judith; Wren, Kiley

    2006-01-01

    Maintenance of human health on long-duration exploration missions is a primary challenge to mission designers. Indeed, human health risks are currently the largest risk contributors to the risks of evacuation or loss of the crew on long-duration International Space Station missions. We describe a quantitative assessment of the relative probabilities of occurrence of the individual risks to human safety and efficiency during space flight to augment qualitative assessments used in this field to date. Quantitative probabilistic risk assessments will allow program managers to focus resources on those human health risks most likely to occur with undesirable consequences. Truly quantitative assessments are common, even expected, in the engineering and actuarial spheres, but that capability is just emerging in some arenas of life sciences research, such as identifying and minimize the hazards to astronauts during future space exploration missions. Our expectation is that these results can be used to inform NASA mission design trade studies in the near future with the objective of preventing the higher among the human health risks. We identify and discuss statistical techniques to provide this risk quantification based on relevant sets of astronaut biomedical data from short and long duration space flights as well as relevant analog populations. We outline critical assumptions made in the calculations and discuss the rationale for these. Our efforts to date have focussed on quantifying the probabilities of medical risks that are qualitatively perceived as relatively high risks of radiation sickness, cardiac dysrhythmias, medically significant renal stone formation due to increased calcium mobilization, decompression sickness as a result of EVA (extravehicular activity), and bone fracture due to loss of bone mineral density. We present these quantitative probabilities in order-of-magnitude comparison format so that relative risk can be gauged. We address the effects of

  20. Use of product databases for risk assessment purposes

    International Nuclear Information System (INIS)

    Heinemeyer, Gerhard; Hahn, Axel

    2005-01-01

    Product information databases are important prerequisites for providing data to poison centers (PC) to give adequate advice in cases of poisonings and for preparation of statistics as annual reports. For risk assessment measures, they can help for exposure assessments and for priority setting. A product database is a set of information of product and substance names, compositions, and uses of products. Data are provided due to national regulations as well as to national and international agreements between industry, international associations, e.g. the European Association of Poison Centres and Clinical Toxicologists (EAPCCT), and clinical toxicology institutions. They have different contents, i.e. complete formulations, frame formulations, and material safety data sheets. For definite identification of products, the product name should be readily taken from the labels and must be similar to the names provided by electronic media as databases. Products should be classified according to their use. The first system that has been prepared for that purpose is the ATC classification for pharmaceuticals. For chemicals, several systems e.g. the WHO-IPCS classification code, exist; the EU technical guidance document for risk assessment of chemicals is mentioning use categories, and they are used on national levels as well. For risk assessment purposes, statistics of poisonings and other health hazards are important as well as information about exposure. Linking cases of poisonings with product data enables risk assessors to perform statistical evaluations about health effects due to product use categories which can be compared to product compositions. If products are categorized by their use, information about use characteristics, such as frequencies and durations, can be derived. Hence, product categories can be taken to characterize scenarios and thus help for model estimations of exposure and respective doses

  1. Information Security Risk Assessment in Hospitals.

    Science.gov (United States)

    Ayatollahi, Haleh; Shagerdi, Ghazal

    2017-01-01

    To date, many efforts have been made to classify information security threats, especially in the healthcare area. However, there are still many unknown risks which may threat the security of health information and their resources especially in the hospitals. The aim of this study was to assess the risks threatening information security in the hospitals located in one of the northwest cities of Iran. This study was completed in 2014. The participants were information technology managers who worked in the hospitals (n=27). The research instrument was a questionnaire composed of a number of open and closed questions. The content validity of the questionnaire was confirmed, and the reliability of the closed questions was measured by using the test-retest method (r =0.78). The results showed that among the information security risks, fire found to be a high probability/high impact risk factor. Human and physical/environmental threats were among the low probability risk factors. Regarding the information security safeguards used in the hospitals, the results showed that the use of the technical safeguards was the most frequent one (n =22, 91.7%) compared to the administrative (n =21, 87.5%) and the physical safeguards (n =16, 66.7%). The high probability risk factors require quick corrective actions to be taken. Therefore, the underlying causes of such threats should be identified and controlled before experiencing adverse effects. It is also important to note that information security in health care systems needs to be considered at a macro level with respect to the national interests and policies.

  2. Uncertainty studies and risk assessment for CO{sub 2} storage in geological formations

    Energy Technology Data Exchange (ETDEWEB)

    Walter, Lena Sophie

    2013-07-01

    drinking water aquifers. The uncertainties on all three levels are investigated in three approaches with different focus. The concept can also be applied to CO{sub 2} leakage or hazards related to other technologies in the subsurface such as methane storage or atomic waste disposal. In the second part of this thesis, uncertainty studies for two realistic storage formations (the pilot site Ketzin (Germany) and a realistic storage formation in the North German Basin) are performed to investigate the related uncertainties and to reduce them as much as possible. For the Ketzin site, history matching of the measurement data, is an important task for dynamic modeling and essential for future risk assessment. A systematic approach to fit the data set using inverse modeling is presented in this work. For future risk assessment for realistic sites, e.g. for the Ketzin site, the uncertainty studies and the history matching approach provide important information. Finally, CCS is discussed in the context of risk perception and the possible input of the risk assessment concept presented in this work is discussed. This work is a first attempt to connect the technical risk assessment for CO{sub 2} storage to the social science approach for risk assessment. It is bridging the gap between engineering and social sciences by integrating the technical quantification of risk into the wider context of a comprehensive risk governance model.

  3. Pollutant Assessments Group procedures manual: Volume 2, Technical procedures

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    This is volume 2 of the manuals that describes the technical procedures currently in use by the Pollution Assessments Group. This manual incorporates new developments in hazardous waste assessment technology and administrative policy. Descriptions of the equipment, procedures and operations of such things as radiation detection, soil sampling, radionuclide monitoring, and equipment decontamination are included in this manual. (MB)

  4. Assessment of the Use of AutoCAD in Mechanical Engineering Technical Drawing Education

    OpenAIRE

    Akyürek, Turgut

    2018-01-01

    AutoCAD is one of the widely used software tools in engineering education. In this study, ageneral assessment of AutoCAD for the usage in the mechanical engineering technical drawing educationis made. AutoCAD is assessed in terms of the fulfilment of the requirements defined for the main twotechnical drawing courses. AutoCAD is assessed in terms of its capability in meeting the requirements ofthe technical drawing courses.

  5. Regulatory Forum commentary: alternative mouse models for future cancer risk assessment.

    Science.gov (United States)

    Morton, Daniel; Sistare, Frank D; Nambiar, Prashant R; Turner, Oliver C; Radi, Zaher; Bower, Nancy

    2014-07-01

    International regulatory and pharmaceutical industry scientists are discussing revision of the International Conference on Harmonisation of Technical Requirements for Registration of Pharmaceuticals for Human Use (ICH) S1 guidance on rodent carcinogenicity assessment of small molecule pharmaceuticals. A weight-of-evidence approach is proposed to determine the need for rodent carcinogenicity studies. For compounds with high human cancer risk, the product may be labeled appropriately without conducting rodent carcinogenicity studies. For compounds with minimal cancer risk, only a 6-month transgenic mouse study (rasH2 mouse or p53+/- mouse) or a 2-year mouse study would be needed. If rodent carcinogenicity testing may add significant value to cancer risk assessment, a 2-year rat study and either a 6-month transgenic mouse or a 2-year mouse study is appropriate. In many cases, therefore, one rodent carcinogenicity study could be sufficient. The rasH2 model predicts neoplastic findings relevant to human cancer risk assessment as well as 2-year rodent models, produces fewer irrelevant neoplastic outcomes, and often will be preferable to a 2-year rodent study. Before revising ICH S1 guidance, a prospective evaluation will be conducted to test the proposed weight-of-evidence approach. This evaluation offers an opportunity for a secondary analysis comparing the value of alternative mouse models and 2-year rodent studies in the proposed ICH S1 weight-of-evidence approach for human cancer risk assessment. © 2014 by The Author(s).

  6. Comparative Analysis of Fuzzy Set Defuzzification Methods in the Context of Ecological Risk Assessment

    Directory of Open Access Journals (Sweden)

    Užga-Rebrovs Oļegs

    2017-12-01

    Full Text Available Fuzzy inference systems are widely used in various areas of human activity. Their most widespread use lies in the field of fuzzy control of technical devices of different kind. Another direction of using fuzzy inference systems is modelling and assessment of different kind of risks under insufficient or missing objective initial data. Fuzzy inference is concluded by the procedure of defuzzification of the resulting fuzzy sets. A large number of techniques for implementing the defuzzification procedure are available nowadays. The paper presents a comparative analysis of some widespread methods of fuzzy set defuzzification, and proposes the most appropriate methods in the context of ecological risk assessment.

  7. Risk-based technical specifications: Development and application of an approach to the generation of a plant specific real-time risk model

    International Nuclear Information System (INIS)

    Puglia, B.; Gallagher, D.; Amico, P.; Atefi, B.

    1992-10-01

    This report describes a process developed to convert an existing PRA into a model amenable to real time, risk-based technical specification calculations. In earlier studies (culminating in NUREG/CR-5742), several risk-based approaches to technical specification were evaluated. A real-time approach using a plant specific PRA capable of modeling plant configurations as they change was identified as the most comprehensive approach to control plant risk. A master fault tree logic model representative of-all of the core damage sequences was developed. Portions of the system fault trees were modularized and supercomponents comprised of component failures with similar effects were developed to reduce the size of the model and, quantification times. Modifications to the master fault tree logic were made to properly model the effect of maintenance and recovery actions. Fault trees representing several actuation systems not modeled in detail in the existing PRA were added to the master fault tree logic. This process was applied to the Surry NUREG-1150 Level 1 PRA. The master logic mode was confirmed. The model was then used to evaluate frequency associated with several plant configurations using the IRRAS code. For all cases analyzed computational time was less than three minutes. This document Volume 2, contains appendices A, B, and C. These provide, respectively: Surry Technical Specifications Model Database, Surry Technical Specifications Model, and a list of supercomponents used in the Surry Technical Specifications Model

  8. Hanford Site's Integrated Risk Assessment Program: No-intervention risk assessment

    International Nuclear Information System (INIS)

    Mahaffey, J.A.; Dukelow, J.S. Jr.; Stenner, R.D.

    1994-08-01

    The long-term goal of the Integrated Risk Assessment program (IRAP) is to estimate risks to workers, the public, organizations, and groups with reserved rights to Site access, the ecosystem, and natural resources to aid in managing environmental restoration and waste management at the Hanford Site. For each of these, information is needed about current risks, risks during cleanup, and endstate risks. The objective is three-fold: to determine if and when to remediate, and to what extent; to identify information unavailable but needed to make better cleanup decisions; to establish technology performance criteria for achieving desired cleanup levels; to understand costs and benefits of activities from a Site-wide perspective. The no-intervention risk, assessment is the initial evaluation of public health risks conducted under IRAP. The objective is to identify types of activities that the US Department of Energy (DOE) must accomplish for closure of the Hanford Site, defined as no further DOE intervention. There are two primary conclusions from the no-intervention risk assessment. First, some maintenance and operations activities at Hanford must be continued to protect the public from grave risks. However, when large Hanford expenditures are compared to cleanup progress, funds expended for maintenance and operations must be put in proper perspective. Second, stakeholder's emphasis on public risks at Hanford, as indicated by remediation priorities, are not in line with those estimated. The focus currently is on compliance with regulations, and on dealing with issues which are visible to stakeholders

  9. A National Needs Assessment to Identify Technical Procedures in Vascular Surgery for Simulation Based Training.

    Science.gov (United States)

    Nayahangan, L J; Konge, L; Schroeder, T V; Paltved, C; Lindorff-Larsen, K G; Nielsen, B U; Eiberg, J P

    2017-04-01

    Practical skills training in vascular surgery is facing challenges because of an increased number of endovascular procedures and fewer open procedures, as well as a move away from the traditional principle of "learning by doing." This change has established simulation as a cornerstone in providing trainees with the necessary skills and competences. However, the development of simulation based programs often evolves based on available resources and equipment, reflecting convenience rather than a systematic educational plan. The objective of the present study was to perform a national needs assessment to identify the technical procedures that should be integrated in a simulation based curriculum. A national needs assessment using a Delphi process was initiated by engaging 33 predefined key persons in vascular surgery. Round 1 was a brainstorming phase to identify technical procedures that vascular surgeons should learn. Round 2 was a survey that used a needs assessment formula to explore the frequency of procedures, the number of surgeons performing each procedure, risk and/or discomfort, and feasibility for simulation based training. Round 3 involved elimination and ranking of procedures. The response rate for round 1 was 70%, with 36 procedures identified. Round 2 had a 76% response rate and resulted in a preliminary prioritised list after exploring the need for simulation based training. Round 3 had an 85% response rate; 17 procedures were eliminated, resulting in a final prioritised list of 19 technical procedures. A national needs assessment using a standardised Delphi method identified a list of procedures that are highly suitable and may provide the basis for future simulation based training programs for vascular surgeons in training. Copyright © 2017 European Society for Vascular Surgery. Published by Elsevier Ltd. All rights reserved.

  10. Assessing innovation in emerging energy technologies: Socio-technical dynamics of carbon capture and storage (CCS) and enhanced geothermal systems (EGS) in the USA

    International Nuclear Information System (INIS)

    Stephens, Jennie C.; Jiusto, Scott

    2010-01-01

    This study applies a socio-technical systems perspective to explore innovation dynamics of two emerging energy technologies with potential to reduce greenhouse gas emissions from electrical power generation in the United States: carbon capture and storage (CCS) and enhanced geothermal systems (EGS). The goal of the study is to inform sustainability science theory and energy policy deliberations by examining how social and political dynamics are shaping the struggle for resources by these two emerging, not-yet-widely commercializable socio-technical systems. This characterization of socio-technical dynamics of CCS and EGS innovation includes examining the perceived technical, environmental, and financial risks and benefits of each system, as well as the discourses and actor networks through which the competition for resources - particularly public resources - is being waged. CCS and EGS were selected for the study because they vary considerably with respect to their social, technical, and environmental implications and risks, are unproven at scale and uncertain with respect to cost, feasibility, and life-cycle environmental impacts. By assessing the two technologies in parallel, the study highlights important social and political dimensions of energy technology innovation in order to inform theory and suggest new approaches to policy analysis.

  11. Subjective Risk Assessment and Perception in the Greek and English Bakery Industries

    Directory of Open Access Journals (Sweden)

    Evangelos C. Alexopoulos

    2009-01-01

    Full Text Available Several factors influencing risk perception in the area of occupational health and safety are known, but there is still lack of a full understanding of the ways in which people characterize risk. This study aimed to provide an insight of employee risk assessment and perception in the bakery industry. 87 British and 64 Greek employees in two comparable bakery companies were asked to estimate and evaluate hazards at their workplace. The participants' judgments of 12 hazards—according to 7 risk aspects—were collected and analyzed. Subjective assessment on important occupational hazards included handling heavy loads, repetitiveness, high temperatures, high rate of work, stressful deadlines, and noise. Although limited in the population involved, our findings revealed strong cross-national differences in employee risk perception of specific groups of hazards in the bakery industry. Additional interviews revealed evidence that Greek employees' risk perception depends mostly on work experience while British employees were aware of risks due to company health and safety policy, recognizing that safety is the responsibility of both the management and the worker. Cross-national (cultural factors that influence workforce risk perception and attitudes towards safety have to be taken into account by technical experts and policy makers in the designing of prevention strategies and risk communication.

  12. Subjective Risk Assessment and Perception in the Greek and English Bakery Industries

    International Nuclear Information System (INIS)

    Alexopoulos, E.C.; Kavadi, Z.; Bakoyannis, G.; Papantonopoulos, S.

    2010-01-01

    Several factors influencing risk perception in the area of occupational health and safety are known, but there is still lack of a full understanding of the ways in which people characterize risk. This study aimed to provide an insight of employee risk assessment and perception in the bakery industry. 87 British and 64 Greek employees in two comparable bakery companies were asked to estimate and evaluate hazards at their workplace. The participants judgments of 12 hazards according to 7 risk aspects were collected and analyzed. Subjective assessment on important occupational hazards included handling heavy loads, repetitiveness, high temperatures, high rate of work, stressful deadlines, and noise. Although limited in the population involved, our findings revealed strong cross-national differences in employee risk perception of specific groups of hazards in the bakery industry. Additional interviews revealed evidence that Greek employees risk perception depends mostly on work experience while British employees were aware of risks due to company health and safety policy, recognizing that safety is the responsibility of both the management and the worker. Cross-national (cultural) factors that influence workforce risk perception and attitudes towards safety have to be taken into account by technical experts and policy makers in the designing of prevention strategies and risk communication.

  13. Chemical Risk Assessment

    Science.gov (United States)

    This course is aimed at providing an overview of the fundamental guiding principles and general methods used in chemical risk assessment. Chemical risk assessment is a complex and ever-evolving process. These principles and methods have been organized by the National Research Cou...

  14. Assessing Risk in Costing High-energy Accelerators: from Existing Projects to the Future Linear Collider

    CERN Document Server

    Lebrun, Philippe

    2010-01-01

    High-energy accelerators are large projects funded by public money, developed over the years and constructed via major industrial contracts both in advanced technology and in more conventional domains such as civil engineering and infrastructure, for which they often constitute one-of markets. Assessing their cost, as well as the risk and uncertainty associated with this assessment is therefore an essential part of project preparation and a justified requirement by the funding agencies. Stemming from the experience with large circular colliders at CERN, LEP and LHC, as well as with the Main Injector, the Tevatron Collider Experiments and Accelerator Upgrades, and the NOvA Experiment at Fermilab, we discuss sources of cost variance and derive cost risk assessment methods applicable to the future linear collider, through its two technical approaches for ILC and CLIC. We also address disparities in cost risk assessment imposed by regional differences in regulations, procedures and practices.

  15. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    International Nuclear Information System (INIS)

    Collins, John W.

    2011-01-01

    Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap

  16. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    Energy Technology Data Exchange (ETDEWEB)

    John W. Collins

    2011-09-01

    Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap

  17. An integrated risk assessment approach: Risk assessment in the programmatic environmental impact statement

    International Nuclear Information System (INIS)

    Morris, J.M.

    1994-01-01

    The following paper is an informal summary of salient points made in the presentation entitled open-quotes An Integrated Risk Assessment Approach: Risk Assessment in the Programmatic Environmental Impact Statement (PEIS).close quotes. This presentation was given at the U.S. DOE Integrated Planning Workshop in Denver, Colorado on June 2, 1994. Integrated decision analysis is very important in environmental restoration and waste management in the evaluation of such things as land use planning, waste load forecasting, cost analyses, and technology development activities. Integrated risk assessment is an approach that addresses multiple components of risk, including: risks from surplus facilities as well as typical environmental restoration sites, risks to the public, risks to workers, ecological risk, risks before, during and after remediation activities, and others

  18. Assessing the feasibility of the Healthy Life in Suriname Study: using advanced hemodynamics to evaluate cardiovascular risk

    NARCIS (Netherlands)

    Aartman, Jet Q.; Diemer, Frederieke S.; Karamat, Fares A.; Bohte, Evelien; Baldew, Sergio M.; Jarbandhan, Ameerani V.; van Montfrans, Gert A.; Oehlers, Glenn P.; Brewster, Lizzy M.

    2017-01-01

    Objectives. To determine the feasibility of assessing population cardiovascular risk with advanced hemodynamics in the Healthy Life in Suriname (HELISUR) study. Methods. This was a preliminary study conducted in May - June 2012 using the Technical-Economic-Legal-Operational-Scheduling (TELOS) method

  19. 78 FR 39284 - Technical Guidance for Assessing Environmental Justice in Regulatory Analysis

    Science.gov (United States)

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OA-2013-0320; FRL-9830-1] Technical Guidance for Assessing Environmental Justice in Regulatory Analysis AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... Environmental Protection Agency (EPA) issued for public comment a document entitled, ``Technical Guidance for...

  20. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  1. Risk-informed decision making a keystone in advanced safety assessment

    International Nuclear Information System (INIS)

    Reinhart, M.

    2007-01-01

    Probabilistic Safety Assessment (PSA) has provided extremely valuable complementary insight, perspective, comprehension, and balance to deterministic nuclear reactor safety assessment. This integrated approach of risk-informed management and decision making has been called Risk-Informed Decision Making (RIDM). RIDM provides enhanced safety, reliability, operational flexibility, reduced radiological exposure, and improved fiscal economy. Applications of RIDM continuously increase. Current applications are in the areas of design, construction, licensing, operations, and security. Operational phase safety applications include the following: technical specifications improvement, risk-monitors and configuration control, maintenance planning, outage planning and management, in-service inspection, inservice testing, graded quality assurance, reactor oversight and inspection, inspection finding significance determination, operational events assessment, and rulemaking. Interestingly there is a significant spectrum of approaches, methods, programs, controls, data bases, and standards. The quest of many is to assimilate the full compliment of PSA and RIDM information and to achieve a balanced international harmony. The goal is to focus the best of the best, so to speak, for the benefit of all. Accordingly, this presentation will address the principles, benefits, and applications of RIDM. It will also address some of the challenges and areas to improve. Finally it will highlight efforts by the IAEA and others to capture the international thinking, experience, successes, challenges, and lessons in RIDM. (authors)

  2. The examination assessment of technical competence in vascular surgery.

    Science.gov (United States)

    Pandey, V A; Wolfe, J H N; Liapis, C D; Bergqvist, D

    2006-09-01

    The European Board of Surgery Qualification in Vascular Surgery is a pan-European examination for vascular surgeons who have attained a national certificate of completion of specialist training. A 2-year study was conducted before the introduction of a technical skills assessment in the examination. The study included 30 surgeons: 22 candidates and eight examiners. They were tested on dissection (on a synthetic saphenofemoral junction model), anastomosis (on to anterior tibial artery of a synthetic leg model) and dexterity (a knot-tying simulator with electromagnetic motion analysis). Validated rating scales were used by two independent examiners. Composite knot-tying scores were calculated for the computerized station. The stations were weighted 35, 45 and 20 percent, respectively. Examiners performed better than candidates in the dissection (P<0.001), anastomosis (P=0.002) and dexterity (P=0.005) stations. Participants performed consistently in the examination (dissection versus anastomosis: r=0.79, P<0.001; dexterity versus total operative score: r=-0.73, P<0.001). Interobserver reliability was high (alpha=0.91). No correlation was seen between a candidate's technical skill and oral examination performance or logbook-accredited scores. Current surgical examinations do not address technical competence. This model appears to be a valid assessment of technical skills in an examination setting. The standards are set at a level appropriate for a specialist vascular surgeon. Copyright (c) 2006 British Journal of Surgery Society Ltd.

  3. The relation of risk assessment and health impact assessment

    DEFF Research Database (Denmark)

    Ádám, Balázs; Gulis, Gabriel

    2013-01-01

    than assessing a present situation. As part of this process, however, methods applied in risk assessment are used. Risk assessment typically characterises relation of a well-defined risk factor to a well-defined health outcome. Within HIA usually several individual risk assessments are needed...... of the causal chain from the proposal through related health determinants and risk factors to health outcomes. The stepwise analysis, systematic prioritization and consideration of horizontal interactions between the causal pathways make it feasible to use widely recognized risk assessment methods in the HIA......The level and distribution of health risks in a society is substantially influenced by measures of various policies, programmes or projects. Risk assessment can evaluate the nature, likelihood and severity of an adverse effect. Health impact assessment (HIA) provides similar function when used...

  4. Assessment of cardiovascular risk.

    LENUS (Irish Health Repository)

    Cooney, Marie Therese

    2010-10-01

    Atherosclerotic cardiovascular disease (CVD) is the most common cause of death worldwide. Usually atherosclerosis is caused by the combined effects of multiple risk factors. For this reason, most guidelines on the prevention of CVD stress the assessment of total CVD risk. The most intensive risk factor modification can then be directed towards the individuals who will derive the greatest benefit. To assist the clinician in calculating the effects of these multiple interacting risk factors, a number of risk estimation systems have been developed. This review address several issues regarding total CVD risk assessment: Why should total CVD risk be assessed? What risk estimation systems are available? How well do these systems estimate risk? What are the advantages and disadvantages of the current systems? What are the current limitations of risk estimation systems and how can they be resolved? What new developments have occurred in CVD risk estimation?

  5. LAVA: A conceptual framework for automated risk assessment

    International Nuclear Information System (INIS)

    Smith, S.T.; Brown, D.C.; Erkkila, T.H.; FitzGerald, P.D.; Lim, J.J.; Massagli, L.; Phillips, J.R.; Tisinger, R.M.

    1986-01-01

    At the Los Alamos National Laboratory the authors are developing the framework for generating knowledge-based systems that perform automated risk analyses on an organizations's assets. An organization's assets can be subdivided into tangible and intangible assets. Tangible assets include facilities, material, personnel, and time, while intangible assets include such factors as reputation, employee morale, and technical knowledge. The potential loss exposure of an asset is dependent upon the threats (both static and dynamic), the vulnerabilities in the mechanisms protecting the assets from the threats, and the consequences of the threats successfully exploiting the protective systems vulnerabilities. The methodology is based upon decision analysis, fuzzy set theory, natural language processing, and event tree structures. The Los Alamos Vulnerability and Risk Assessment (LAVA) methodology has been applied to computer security. The program generates both summary reports for use by both management personnel and detailed reports for use by operations staff

  6. Assessing the feasibility of the Healthy Life in Suriname Study: using advanced hemodynamics to evaluate cardiovascular risk

    Directory of Open Access Journals (Sweden)

    Jet Q. Aartman

    2017-06-01

    Full Text Available ABSTRACT Objectives To determine the feasibility of assessing population cardiovascular risk with advanced hemodynamics in the Healthy Life in Suriname (HELISUR study. Methods This was a preliminary study conducted in May – June 2012 using the Technical-Economic-Legal-Operational-Scheduling (TELOS method to assess the feasibility of the HELISUR—a large-scale, cross-sectional population study of cardiovascular risk factors and disease in Suriname. Suriname, a middle-income country in South America with a population of mostly African and Asian ethnicity, has a high risk of cardiovascular disease. A total of 135 volunteers 18 – 70 years of age participated. A health questionnaire was tested in a primary health care center, and non-invasive cardiovascular evaluations were performed in an academic health center. The cardiovascular evaluation included sitting, supine, and standing blood pressure, and intermediate endpoints, such as cardiac output, peripheral vascular resistance, pulse wave velocity, and augmentation index. Results The TELOS testing found that communicating by cellular phone was most effective for appointment adherence, and that completion of the questionnaire often required assistance from a trained interviewer; modifications to improve the clarity of the questions are recommended. Regarding the extended cardiovascular assessments of peripheral and central hemodynamics, the findings showed these to be technically and operationally feasible and well tolerated by participants, in terms of burden and duration. Conclusions Findings of this feasibility assessment indicate that large-scale, detailed evaluations of cardiovascular risk, including a questionnaire and advanced central and peripheral hemodynamics, are feasible in a high-risk population in a middle-income setting.

  7. Advances in multi-unit nuclear power plant probabilistic risk assessment

    International Nuclear Information System (INIS)

    Modarres, Mohammad; Zhou, Taotao; Massoud, Mahmoud

    2017-01-01

    The Fukushima Dai-ichi accident highlighted the importance of risks from multiple nuclear reactor unit accidents at a site. As a result, there has been considerable interest in Multi-Unit Probabilistic Risk Assessment (MUPRA) in the past few years. For considerations in nuclear safety, the MUPRA estimates measures of risk and identifies contributors to risk representing the entire site rather than the individual units in the site. In doing so, possible unit-to-unit interactions and dependencies should be modeled and accounted for in the MUPRA. In order to effectively account for these risks, six main commonality classifications—initiating events, shared connections, identical components, proximity dependencies, human dependencies, and organizational dependencies—may be used. This paper examines advances in MUPRA, offers formal definitions of multi-unit site risk measures and proposes quantitative approaches and data to account for unit-to-unit dependencies. Finally, a parametric approach for the multi-unit dependencies has been discussed and a simple example illustrates application of the proposed methodology. - Highlights: • This paper will discuss the technical aspects of an integrated MUPRA, including consideration of dependencies and assessment of the multi-unit dependency data and models for quantifying such dependencies. • The paper also provides discussions on formal definitions and metrics for multi-unit site risks. • The parametric methods are used to address multi-unit dependency situations. • A conceptual two-unit logic example is used to demonstrate the application of proposed methodology.

  8. A root cause analysis approach to risk assessment of a pipeline network for Kuwait Oil Company

    Energy Technology Data Exchange (ETDEWEB)

    Davies, Ray J.; Alfano, Tony D. [Det Norske Veritas (DNV), Rio de Janeiro, RJ (Brazil); Waheed, Farrukh [Kuwait Oil Company, Ahmadi (Kuwait); Komulainen, Tiina [Kongsberg Oil and Gas Technologies, Sandvika (Norway)

    2009-07-01

    A large scale risk assessment was performed by Det Norske Veritas (DNV) for the entire Kuwait Oil Company (KOC) pipeline network. This risk assessment was unique in that it incorporated the assessment of all major sources of process related risk faced by KOC and included root cause management system related risks in addition to technical risks related to more immediate causes. The assessment was conducted across the entire pipeline network with the scope divided into three major categories:1. Integrity Management 2. Operations 3. Management Systems Aspects of integrity management were ranked and prioritized using a custom algorithm based on critical data sets. A detailed quantitative risk assessment was then used to further evaluate those issues deemed unacceptable, and finally a cost benefit analysis approach was used to compare and select improvement options. The operations assessment involved computer modeling of the entire pipeline network to assess for bottlenecks, surge and erosion analysis, and to identify opportunities within the network that could potentially lead to increased production. The management system assessment was performed by conducting a gap analysis on the existing system and by prioritizing those improvement actions that best aligned with KOC's strategic goals for pipelines. Using a broad and three-pronged approach to their overall risk assessment, KOC achieved a thorough, root cause analysis-based understanding of risks to their system as well as a detailed list of recommended remediation measures that were merged into a 5-year improvement plan. (author)

  9. Bioavailability in ecological risk. Assessment for radionuclides

    International Nuclear Information System (INIS)

    Garnier-Laplace, J.; Gilbin, R.; Della-Vedova, C.; Adam, C.; Simon, O.; Denison, F.; Beaugelin, K.

    2005-01-01

    The guidance for performing Ecological Risk Assessments (ERA) in Europe has been published in 2003 in the EC's Technical Guidance Document. This document constitutes the official reference in which current water quality standards and risk assessment approach for metals/metalloids are still mainly based on total or dissolved concentrations. However, it has been recognized that accurate assessment of the bio-available metal fraction is crucial, even if the way to incorporate bioavailability into these procedures is still under discussion. The speciation of a pollutant in the exposure medium is the first factor that regulates its bioavailability and consequently its bioaccumulation and the induced biological effects. Therefore, within any ecological risk assessment, bioavailability has obvious implications: firstly in exposure analysis which aim is to determine Predicted Exposure Concentration (PEC); secondly in effect analysis while deriving the so-called Predicted No-Effect Concentrations (PNEC) as toxicity is often linked to the amount of the contaminant incorporated into the tissues of biota. Similarities between metals/metalloids and radionuclides are limited to the biogeochemical behaviour of the element considered and to the need to use bioavailability models. In addition, for radionuclides, emitted ionising radiations (type and energy) need to be taken into account for both exposure and effect analyses whilst performing dosimetric calculations appropriate to the exposure scenarios. A methodology for properly implementing bioavailability models is explained and illustrated for aqueous U(VI), starting from a comprehensive review of the thermodynamic data relevant to environmentally-realistic physico-chemical conditions. Then, the use of thermodynamic equilibrium modelling as a tool for interpreting the bioavailability of U(VI) is presented. Using a systematic approach, different bioavailability models of increasing complexity were tested to model U bio

  10. Developing Technical Skill Assessments

    Science.gov (United States)

    Hyslop, Alisha

    2009-01-01

    One of the biggest challenges facing the career and technical education (CTE) community as it works to implement the 2006 Perkins Act is responding to more rigorous requirements for reporting on CTE students' technical skill attainment. The U.S. Department of Education suggested in non-regulatory guidance that states and locals use the number of…

  11. Information needs for risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

    1990-12-31

    Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

  12. Shale oil and gas: technical and environmental files

    International Nuclear Information System (INIS)

    Schilansky, Jean-Louis; Quehen, Audrey; Appert, Olivier; Aurengo, Andre; Candel, Sebastien; Chanin, Marie-Lise; Geoffron, Patrice; Goffe, Bruno; Marsily, Ghislain de; Pouzet, Andre; Schnapper, Dominique; Tardieu, Bernard

    2016-01-01

    This publication proposes information regarding technical and environmental issues related to shale oil and gas extraction and exploitation. It addresses various topics: hydraulic fracturing (techniques, quantity assessment, regulation), water consumption and management (problematic, quantity assessment, regulation), additives and management of production fluids (a necessary taking into account, quantity assessment, regulation), surface aquifers (surface sheets and exploration activity, quantity assessment, regulation), activity footprint (ground footprint and impact on landscape, quantity assessment, regulation), end of activity and site future (return to the initial condition, quantity assessment, regulation), seismicity (manageable seismic risks, quantity assessment, regulations), greenhouse gas emissions (development, quantity assessment, regulation), issues related to health aspects (general and specific risks, epidemiological studies)

  13. Waste Isolation Pilot Plant Technical Assessment Team Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-03-17

    This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL).

  14. Technical and governance considerations for advanced metering infrastructure/smart meters: Technology, security, uncertainty, costs, benefits, and risks

    International Nuclear Information System (INIS)

    McHenry, Mark P.

    2013-01-01

    The fundamental role of policymakers when considering Advanced Metering Infrastructure (AMI), or ‘smart meters for energy and water infrastructure is to investigate a broad range of complex interrelated issues. These include alternative technical and non-technical options and deployment needs, the cost and benefits of the infrastructure (risks and mitigation measures), and the impact of a number of stakeholders: consumers, distributors, retailers, competitive market operators, competing technology companies, etc. The scale and number of potential variables in the AMI space is an almost unprecedented challenge to policymakers, with the anticipation of new ancillary products and services, associated market contestability, related regulatory and policy amendments, and the adequacy of consumer protection, education, and safety considerations requiring utmost due-diligence. Embarking on AMI investment entails significant technical, implementation, and strategic risk for governments and administering bodies, and an active effort is required to ensure AMI governance and planning maximises the potential benefits, and minimise uncertainties, costs, and risks to stakeholders. This work seeks to clarify AMI fundamentals and discusses the technical and related governance considerations from a dispassionate perspective, yet acknowledges many stakeholders tend to dichotomise debate, and obfuscate both advantages and benefits, and the converse. - Highlights: • AMI presents an almost unprecedented technical and governance policy challenge. • AMI enables vertical integration of electricity, gas, water, IT, and telco entities • AMI investments involve major technical, implementation, and strategic decisions. • Adequacy of consumer education, safety, privacy, and protection is paramount. • Policy must maximise AMI benefits and minimise uncertainties, costs, and risks

  15. Scientific basis for risk assessment and management of uranium mill tailings

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    A National Research Council study panel, convened by the Board on Radioactive Waste Management, has examined the scientific basis for risk assessment and management of uranium mill tailings and issued this final report containing a number of recommendations. Chapter 1 provides a brief introduction to the problem. Chapter 2 examines the processes of uranium extraction and the mechanisms by which radionuclides and toxic chemicals contained in the ore can enter the environment. Chapter 3 is devoted to a review of the evidence on health risks associated with radon and its decay products. Chapter 4 provides a consideration of conventional and possible new technical alternatives for tailings management. Chapter 5 explores a number of issues of comparative risk, provides a brief history of uranium mill tailings regulation, and concludes with a discussion of choices that must be made in mill tailing risk management. 211 refs., 30 figs., 27 tabs.

  16. Scientific basis for risk assessment and management of uranium mill tailings

    International Nuclear Information System (INIS)

    1986-01-01

    A National Research Council study panel, convened by the Board on Radioactive Waste Management, has examined the scientific basis for risk assessment and management of uranium mill tailings and issued this final report containing a number of recommendations. Chapter 1 provides a brief introduction to the problem. Chapter 2 examines the processes of uranium extraction and the mechanisms by which radionuclides and toxic chemicals contained in the ore can enter the environment. Chapter 3 is devoted to a review of the evidence on health risks associated with radon and its decay products. Chapter 4 provides a consideration of conventional and possible new technical alternatives for tailings management. Chapter 5 explores a number of issues of comparative risk, provides a brief history of uranium mill tailings regulation, and concludes with a discussion of choices that must be made in mill tailing risk management. 211 refs., 30 figs., 27 tabs

  17. Technical and economic assessment of energy conversion technologies for MSW

    Energy Technology Data Exchange (ETDEWEB)

    Livingston, W.R.

    2002-07-01

    Thermal processes for municipal solid wastes (MSW) based on pyrolysis and/or gasification that have relevance to the emerging UK market are described in this report, and the results of the technical and economical assessment of these processes are presented. The Mitsui R21 Technology, the Thermoselect Process, the Nippon Steel Waste Melting Process, the Pyropleq Process, and the Compact Power Process are selected for detailed comparison on the basis of the overall technical concept, the energy balance and the requirements for consumables, environmental performance, and the technical and commercial status of the technology. Details are also given of a comparison of the novel thermal technologies with conventional mass burn incineration for MSW.

  18. Technical and economic assessment of energy conversion technologies for MSW

    International Nuclear Information System (INIS)

    Livingston, W.R.

    2002-01-01

    Thermal processes for municipal solid wastes (MSW) based on pyrolysis and/or gasification that have relevance to the emerging UK market are described in this report, and the results of the technical and economical assessment of these processes are presented. The Mitsui R21 Technology, the Thermoselect Process, the Nippon Steel Waste Melting Process, the Pyropleq Process, and the Compact Power Process are selected for detailed comparison on the basis of the overall technical concept, the energy balance and the requirements for consumables, environmental performance, and the technical and commercial status of the technology. Details are also given of a comparison of the novel thermal technologies with conventional mass burn incineration for MSW

  19. Methodology of environmental risk assessment management

    Directory of Open Access Journals (Sweden)

    Saša T. Bakrač

    2012-04-01

    Full Text Available Successful protection of environment is mostly based on high-quality assessment of potential and present risks. Environmental risk management is a complex process which includes: identification, assessment and control of risk, namely taking measures in order to minimize the risk to an acceptable level. Environmental risk management methodology: In addition to these phases in the management of environmental risk, appropriate measures that affect the reduction of risk occurrence should be implemented: - normative and legal regulations (laws and regulations, - appropriate organizational structures in society, and - establishing quality monitoring of environment. The emphasis is placed on the application of assessment methodologies (three-model concept, as the most important aspect of successful management of environmental risk. Risk assessment methodology - European concept: The first concept of ecological risk assessment methodology is based on the so-called European model-concept. In order to better understand this ecological risk assessment methodology, two concepts - hazard and risk - are introduced. The European concept of environmental risk assessment has the following phases in its implementation: identification of hazard (danger, identification of consequences (if there is hazard, estimate of the scale of consequences, estimate of consequence probability and risk assessment (also called risk characterization. The European concept is often used to assess risk in the environment as a model for addressing the distribution of stressors along the source - path - receptor line. Risk assessment methodology - Canadian concept: The second concept of the methodology of environmental risk assessment is based on the so-called Canadian model-concept. The assessment of ecological risk includes risk arising from natural events (floods, extreme weather conditions, etc., technological processes and products, agents (chemical, biological, radiological, etc

  20. Integral risk assessment. Technical, ethical and social aspects. Ganzheitliche Risikobetrachtungen. Technische, ethische und soziale Aspekte

    Energy Technology Data Exchange (ETDEWEB)

    Chakraborty, S; Yadigaroglu, G [eds.

    1991-01-01

    The series of lectures which forms the basis of this book and took place in the winter of 1989/90 at the ETH in Zuerich were held for the purpose of discussing the stage of development of our system of ethics in view of the extremely fast pace of technological progress and the risks which accompany it. Legal, psychological and political aspects of the problem were examined, but the emphasis was placed on ethical aspects. The effects which are examined in conventional risk analyses can be considered as a part of the ethical and social aspects involved, and in turn, the consideration of ethical and social aspects can be viewed as an extension of the conventional form of risk analysis. In any case, among risk experts, the significance of ethical and social factors is uncontested, especially as regards activities which can have far-reaching repurcussions. Some objective difficulties interfere with this goal, however: - No generally acknowledged set of ethical values exists. - Cultural influences and personal motives can interfere. - Normally a risk assessment is carried out in reference to individual facilities and within a small, clearly defined framework. Under certain circumstances, generalizations which are made for complete technological systems can lead to completely different conclusions. One contribution deals with integral views of the risks of atomic energy from an ethical and social perspective. (orig.).

  1. Waste management project’s alternatives: A risk-based multi-criteria assessment (RBMCA) approach

    International Nuclear Information System (INIS)

    Karmperis, Athanasios C.; Sotirchos, Anastasios; Aravossis, Konstantinos; Tatsiopoulos, Ilias P.

    2012-01-01

    Highlights: ► We examine the evaluation of a waste management project’s alternatives. ► We present a novel risk-based multi-criteria assessment (RBMCA) approach. ► In the RBMCA the evaluation criteria are based on the quantitative risk analysis of the project’s alternatives. ► Correlation between the criteria weight values and the decision makers’ risk preferences is examined. ► Preference to the multi-criteria against the one-criterion evaluation process is discussed. - Abstract: This paper examines the evaluation of a waste management project’s alternatives through a quantitative risk analysis. Cost benefit analysis is a widely used method, in which the investments are mainly assessed through the calculation of their evaluation indicators, namely benefit/cost (B/C) ratios, as well as the quantification of their financial, technical, environmental and social risks. Herein, a novel approach in the form of risk-based multi-criteria assessment (RBMCA) is introduced, which can be used by decision makers, in order to select the optimum alternative of a waste management project. Specifically, decision makers use multiple criteria, which are based on the cumulative probability distribution functions of the alternatives’ B/C ratios. The RBMCA system is used for the evaluation of a waste incineration project’s alternatives, where the correlation between the criteria weight values and the decision makers’ risk preferences is analyzed and useful conclusions are discussed.

  2. Strategic Risk Assessment

    Science.gov (United States)

    Derleth, Jason; Lobia, Marcus

    2009-01-01

    This slide presentation provides an overview of the attempt to develop and demonstrate a methodology for the comparative assessment of risks across the entire portfolio of NASA projects and assets. It includes information about strategic risk identification, normalizing strategic risks, calculation of relative risk score, and implementation options.

  3. Transcriptomic resources for environmental risk assessment: a case study in the Venice lagoon

    International Nuclear Information System (INIS)

    Milan, M.; Pauletto, M.; Boffo, L.; Carrer, C.; Sorrentino, F.; Ferrari, G.; Pavan, L.; Patarnello, T.; Bargelloni, L.

    2015-01-01

    The development of new resources to evaluate the environmental status is becoming increasingly important representing a key challenge for ocean and coastal management. Recently, the employment of transcriptomics in aquatic toxicology has led to increasing initiatives proposing to integrate eco-toxicogenomics in the evaluation of marine ecosystem health. However, several technical issues need to be addressed before introducing genomics as a reliable tool in regulatory ecotoxicology. The Venice lagoon constitutes an excellent case, in which the assessment of environmental risks derived from the nearby industrial activities represents a crucial task. In this context, the potential role of genomics to assist environmental monitoring was investigated through the definition of reliable gene expression markers associated to chemical contamination in Manila clams, and their subsequent employment for the classification of Venice lagoon areas. Overall, the present study addresses key issues to evaluate the future outlooks of genomics in the environmental monitoring and risk assessment. - Highlights: • Growing need to develop new resources for the evaluation of the environmental status. • Identification of gene expression markers associated to chemical contamination. • Employment of genomics to evaluate the environmental status of Venice lagoon areas. • Hurdles and future outlooks of genomic tools in environmental risk assessment. - Genomics in risk assessment of Venice lagoon

  4. [Urban ecological risk assessment: a review].

    Science.gov (United States)

    Wang, Mei-E; Chen, Wei-Ping; Peng, Chi

    2014-03-01

    With the development of urbanization and the degradation of urban living environment, urban ecological risks caused by urbanization have attracted more and more attentions. Based on urban ecology principles and ecological risk assessment frameworks, contents of urban ecological risk assessment were reviewed in terms of driven forces, risk resources, risk receptors, endpoints and integrated approaches for risk assessment. It was suggested that types and degrees of urban economical and social activities were the driven forces for urban ecological risks. Ecological functional components at different levels in urban ecosystems as well as the urban system as a whole were the risk receptors. Assessment endpoints involved in changes of urban ecological structures, processes, functional components and the integrity of characteristic and function. Social-ecological models should be the major approaches for urban ecological risk assessment. Trends for urban ecological risk assessment study should focus on setting a definite protection target and criteria corresponding to assessment endpoints, establishing a multiple-parameter assessment system and integrative assessment approaches.

  5. A Risk Assessment Model for Water Resources: releases of dangerous and hazardous substances.

    Science.gov (United States)

    Rebelo, Anabela; Ferra, Isabel; Gonçalves, Isolina; Marques, Albertina M

    2014-07-01

    Many dangerous and hazardous substances are used, transported and handled daily in diverse situations, from domestic use to industrial processing, and during those operations, spills or other anomalous situations may occur that can lead to contaminant releases followed by contamination of surface water or groundwater through direct or indirect pathways. When dealing with this problem, rapid, technically sound decisions are desirable, and the use of complex methods may not be able to deliver information quickly. This work describes a simple conceptual model established on multi-criteria based analysis involving a strategic appraisal for contamination risk assessment to support local authorities on rapid technical decisions. The model involves a screening for environmental risk sources, focussing on persistent, bioaccumulative and toxic (PBT) substances that may be discharged into water resources. It is a simple tool that can be used to follow-up actual accident scenarios in real time and to support daily activities, such as site-inspections. Copyright © 2014 Elsevier Ltd. All rights reserved.

  6. Data development technical support document for the aircraft crash risk analysis methodology (ACRAM) standard

    International Nuclear Information System (INIS)

    Kimura, C.Y.; Glaser, R.E.; Mensing, R.W.; Lin, T.; Haley, T.A.; Barto, A.B.; Stutzke, M.A.

    1996-01-01

    The Aircraft Crash Risk Analysis Methodology (ACRAM) Panel has been formed by the US Department of Energy Office of Defense Programs (DOE/DP) for the purpose of developing a standard methodology for determining the risk from aircraft crashes onto DOE ground facilities. In order to accomplish this goal, the ACRAM panel has been divided into four teams, the data development team, the model evaluation team, the structural analysis team, and the consequence team. Each team, consisting of at least one member of the ACRAM plus additional DOE and DOE contractor personnel, specializes in the development of the methodology assigned to that team. This report documents the work performed by the data development team and provides the technical basis for the data used by the ACRAM Standard for determining the aircraft crash frequency. This report should be used to provide the generic data needed to calculate the aircraft crash frequency into the facility under consideration as part of the process for determining the aircraft crash risk to ground facilities as given by the DOE Standard Aircraft Crash Risk Assessment Methodology (ACRAM). Some broad guidance is presented on how to obtain the needed site-specific and facility specific data but this data is not provided by this document

  7. Guidelines on the scope, content, and use of comprehensive risk assessment in the management of high-level nuclear waste transportation

    International Nuclear Information System (INIS)

    Golding, D.; White, A.

    1990-12-01

    This report discusses the scope of risk assessment strategies in the management of the transport of high-level radioactive wastes. In spite of the shortcomings of probabilistic risk assessment(PRA), the Transportation Needs Assessment recommended this as the preferred methodology to assess the risks of high level nuclear waste (HLNW) transportation. A PRA also will need to heed the lessons learned from the development and application of PRA elsewhere, such as in the nuclear power industry. A set of guidelines will aid this endeavor by outlining the appropriate scope, content, and use of a risk assessment which is more responsive to the uncertainties, human-technical interactions, social forces, and iterative relationship with risk management strategies, than traditional PRAS. This more expansive definition, which encompasses but is not totally reliant on rigorous data requirements and quantitative probability estimates, we term Comprehensive Risk Assessment (CRA) Guidelines will be developed in three areas: the limitations of existing methodologies and suggested modifications; CRA as part of a flexible, effective, adaptive risk management system for HLNW transportation; and, the use of CRA in risk communication

  8. [Forensic assessment of violence risk].

    Science.gov (United States)

    Pujol Robinat, Amadeo; Mohíno Justes, Susana; Gómez-Durán, Esperanza L

    2014-03-01

    Over the last 20 years there have been steps forward in the field of scientific research on prediction and handling different violent behaviors. In this work we go over the classic concept of "criminal dangerousness" and the more current of "violence risk assessment". We analyze the evolution of such assessment from the practice of non-structured clinical expert opinion to current actuarial methods and structured clinical expert opinion. Next we approach the problem of assessing physical violence risk analyzing the HCR-20 (Assessing Risk for Violence) and we also review the classic and complex subject of the relation between mental disease and violence. One of the most problematic types of violence, difficult to assess and predict, is sexual violence. We study the different actuarial and sexual violence risk prediction instruments and in the end we advise an integral approach to the problem. We also go through partner violence risk assessment, describing the most frequently used scales, especially SARA (Spouse Assault Risk Assessment) and EPV-R. Finally we give practical advice on risk assessment, emphasizing the importance of having maximum information about the case, carrying out a clinical examination, psychopathologic exploration and the application of one of the described risk assessment scales. We'll have to express an opinion about the dangerousness/risk of future violence from the subject and some recommendations on the conduct to follow and the most advisable treatment. Copyright © 2014 Elsevier España, S.L. All rights reserved.

  9. Risk assessment of nonhazardous oil-field waste disposal in salt caverns.

    Energy Technology Data Exchange (ETDEWEB)

    Elcock, D.

    1998-03-10

    that if caverns are sited and designed well, operated carefully, closed properly, and monitored routinely, they could, from technical and legal perspectives, be suitable for disposing of oil-field wastes. On the basis of these findings, ANL subsequently conducted a preliminary risk assessment on the possibility that adverse human health effects (carcinogenic and noncarcinogenic) could result from exposure to contaminants released from the NOW disposed of in salt caverns. The methodology for the risk assessment included the following steps: identifying potential contaminants of concern; determining how humans could be exposed to these contaminants; assessing contaminant toxicities; estimating contaminant intakes; and estimating human cancer and noncancer risks. To estimate exposure routes and pathways, four postclosure cavern release scenarios were assessed. These were inadvertent cavern intrusion, failure of the cavern seal, failure of the cavern through cracks, failure of the cavern through leaky interbeds, and partial collapse of the cavern roof. Assuming a single, generic, salt cavern and generic oil-field wastes, potential human health effects associated with constituent hazardous substances (arsenic, benzene, cadmium, and chromium) were assessed under each of these scenarios. Preliminary results provided excess cancer risk and hazard index (for noncancer health effects) estimates that were well within the EPA target range for acceptable exposure risk levels. These results lead to the preliminary conclusion that from a human health perspective, salt caverns can provide an acceptable disposal method for nonhazardous oil-field wastes.

  10. Risk assessment of nonhazardous oil-field waste disposal in salt caverns

    International Nuclear Information System (INIS)

    Elcock, D.

    1998-01-01

    that if caverns are sited and designed well, operated carefully, closed properly, and monitored routinely, they could, from technical and legal perspectives, be suitable for disposing of oil-field wastes. On the basis of these findings, ANL subsequently conducted a preliminary risk assessment on the possibility that adverse human health effects (carcinogenic and noncarcinogenic) could result from exposure to contaminants released from the NOW disposed of in salt caverns. The methodology for the risk assessment included the following steps: identifying potential contaminants of concern; determining how humans could be exposed to these contaminants; assessing contaminant toxicities; estimating contaminant intakes; and estimating human cancer and noncancer risks. To estimate exposure routes and pathways, four postclosure cavern release scenarios were assessed. These were inadvertent cavern intrusion, failure of the cavern seal, failure of the cavern through cracks, failure of the cavern through leaky interbeds, and partial collapse of the cavern roof. Assuming a single, generic, salt cavern and generic oil-field wastes, potential human health effects associated with constituent hazardous substances (arsenic, benzene, cadmium, and chromium) were assessed under each of these scenarios. Preliminary results provided excess cancer risk and hazard index (for noncancer health effects) estimates that were well within the EPA target range for acceptable exposure risk levels. These results lead to the preliminary conclusion that from a human health perspective, salt caverns can provide an acceptable disposal method for nonhazardous oil-field wastes

  11. Risk factors for technical failure of endoscopic double self-expandable metallic stent placement by partial stent-in-stent method.

    Science.gov (United States)

    Kawakubo, Kazumichi; Kawakami, Hiroshi; Toyokawa, Yoshihide; Otani, Koichi; Kuwatani, Masaki; Abe, Yoko; Kawahata, Shuhei; Kubo, Kimitoshi; Kubota, Yoshimasa; Sakamoto, Naoya

    2015-01-01

    Endoscopic double self-expandable metallic stent (SEMS) placement by the partial stent-in-stent (PSIS) method has been reported to be useful for the management of unresectable hilar malignant biliary obstruction. However, it is technically challenging, and the optimal SEMS for the procedure remains unknown. The aim of this study was to identify the risk factors for technical failure of endoscopic double SEMS placement for unresectable malignant hilar biliary obstruction (MHBO). Between December 2009 and May 2013, 50 consecutive patients with MHBO underwent endoscopic double SEMS placement by the PSIS method. We retrospectively evaluated the rate of successful double SEMS placement and identified the risk factors for technical failure. The technical success rate for double SEMS placement was 82.0% (95% confidence interval [CI]: 69.2-90.2). On univariate analysis, the rate of technical failure was high in patients with metastatic disease and unilateral placement. Multivariate analysis revealed that metastatic disease was a significant risk factor for technical failure (odds ratio: 9.63, 95% CI: 1.11-105.5). The subgroup analysis after double guidewire insertion showed that the rate of technical success was higher in the laser-cut type SEMS with a large mesh and thick delivery system than in the braided type SEMS with a small mesh and thick delivery system. Metastatic disease was a significant risk factor for technical failure of double SEMS placement for unresectable MHBO. The laser-cut type SEMS with a large mesh and thin delivery system might be preferable for the PSIS procedure. © 2014 Japanese Society of Hepato-Biliary-Pancreatic Surgery.

  12. Risk Assessment and Integration Team (RAIT) Portfolio Risk Analysis Strategy

    Science.gov (United States)

    Edwards, Michelle

    2010-01-01

    Impact at management level: Qualitative assessment of risk criticality in conjunction with risk consequence, likelihood, and severity enable development of an "investment policy" towards managing a portfolio of risks. Impact at research level: Quantitative risk assessments enable researchers to develop risk mitigation strategies with meaningful risk reduction results. Quantitative assessment approach provides useful risk mitigation information.

  13. An assessment of individualized technical ear training for audio production.

    Science.gov (United States)

    Kim, Sungyoung

    2015-07-01

    An individualized technical ear training method is compared to a non-individualized method. The efficacy of the individualized method is assessed using a standardized test conducted before and after the training period. Participants who received individualized training improved better than the control group on the test. Results indicate the importance of individualized training for acquisition of spectrum-identification and spectrum-matching skills. Individualized training, therefore, should be implemented by default into technical ear training programs used in audio production industry and education.

  14. [Risk Assessment and Risk Management of Chemicals in China].

    Science.gov (United States)

    Wang, Tie-yu; Zhou, Yun-qiao; Li, Qi-feng; Lü, Yong-long

    2016-02-15

    Risk assessment and risk management have been increasingly approved as an effective approach for appropriate disposal and scientific management of chemicals. This study systematically analyzed the risk assessment methods of chemicals from three aspects including health risk, ecological risk and regional risk. Based on the current situation of classification and management towards chemicals in China, a specific framework of risk management on chemicals was proposed by selecting target chemicals, predominant industries and related stakeholders as the objects. The results of the present study will provide scientific support for improving risk assessment and reasonable management of chemicals in China.

  15. Recent developments in the external hazard risk assessment in Ukraine

    International Nuclear Information System (INIS)

    2000-01-01

    Ukrainian legislation prescribes safety analysis reports for all operating and future NPPs. Apart from main report they must include: safety analysis supplement; design basis accident analysis; beyond design basis accident analysis; probabilistic safety assessment (PSA); technical; substantiation of safety. Regulatory requirements to PSA contents cover the criteria for core damage frequency and large radioactive release frequency. Initiating events taken into account are internal events; internal hazards and external hazards. External hazards to be considered are seismic events, external fires, external floods, extreme ambient temperatures, aircraft crashes, etc. Current status of PSA development is related to operating WWER-440 and WWER-1000 NPPs and NPPs under construction. This presentation describes in detail the external hazard risk assessment for South Ukraine including methodology applied and expected future activities

  16. Strategic Risk Assessment: A Decision Tool for Complex Decisions

    Energy Technology Data Exchange (ETDEWEB)

    Pollard, Simon; Duarte-Davidson, Raquel; Yearsley, Roger [Environment Agency, London (United Kingdom). National Centre for Risk Analysis and Options Appraisal; Kemp, Ray; Crawford, Mark [Galson Sciences Limited, Oakham (United Kingdom)

    2001-07-01

    Reporting on the state of the environment often requires policy makers and regulators to prioritise a range of diverse environmental issues for the purpose of directing future action on environmental protection and improvement. Information on environmental issues to inform this type of analysis can be disparate, it may be too voluminous or even absent. Data on a range of issues are rarely presented in a common format that allows easy comparison. Nevertheless, strategic judgements are required on the significance of impacts from various environmental pressures and on the inherent uncertainties. Prioritising issues forces a discussion among stakeholders of the relative significance of 'environmental harm' from pressures acting on various receptors in the environment. Discussions of this sort rapidly evolve into a discourse on risks and values. In an attempt to help systematise these discussions and provide practical tools for the analysis of environmental risks at a strategic level, the Environment Agency of England and Wales has initiated developmental research on strategic risk assessment. The tools developed under this research use the concept of 'environmental harm' as a common currency, viewed from technical, social and economic perspectives, to analyse impacts from a range of environmental pressures. Critical to an informed debate is an understanding and analysis both of the various characteristics of harm (spatial and temporal extent, reversibility, latency, etc.) and of the social response to the actual or potential environmental harm. Recent developments in this approach allow a presentation of the analysis in a structured fashion so as to better inform risk management decisions. Here, we present recent developments in the strategic risk assessment research tool, as tested by case studies from state of the environment reporting and the analysis of a regional environmental plan. We discuss its relative advantages and limitations and its

  17. Strategic Risk Assessment: A Decision Tool for Complex Decisions

    International Nuclear Information System (INIS)

    Pollard, Simon; Duarte-Davidson, Raquel; Yearsley, Roger

    2001-01-01

    Reporting on the state of the environment often requires policy makers and regulators to prioritise a range of diverse environmental issues for the purpose of directing future action on environmental protection and improvement. Information on environmental issues to inform this type of analysis can be disparate, it may be too voluminous or even absent. Data on a range of issues are rarely presented in a common format that allows easy comparison. Nevertheless, strategic judgements are required on the significance of impacts from various environmental pressures and on the inherent uncertainties. Prioritising issues forces a discussion among stakeholders of the relative significance of 'environmental harm' from pressures acting on various receptors in the environment. Discussions of this sort rapidly evolve into a discourse on risks and values. In an attempt to help systematise these discussions and provide practical tools for the analysis of environmental risks at a strategic level, the Environment Agency of England and Wales has initiated developmental research on strategic risk assessment. The tools developed under this research use the concept of 'environmental harm' as a common currency, viewed from technical, social and economic perspectives, to analyse impacts from a range of environmental pressures. Critical to an informed debate is an understanding and analysis both of the various characteristics of harm (spatial and temporal extent, reversibility, latency, etc.) and of the social response to the actual or potential environmental harm. Recent developments in this approach allow a presentation of the analysis in a structured fashion so as to better inform risk management decisions. Here, we present recent developments in the strategic risk assessment research tool, as tested by case studies from state of the environment reporting and the analysis of a regional environmental plan. We discuss its relative advantages and limitations and its wider potential role

  18. Assessing Technical Writing in Institutional Contexts: Using Outcomes-Based Assessment for Programmatic Thinking.

    Science.gov (United States)

    Carter, Michael; Anson, Chris M.; Miller, Carolyn R.

    2003-01-01

    Notes that technical writing instruction often operates in isolation from other components of students' communication education. Argues for altering this isolation by moving writing instruction to a place of increased programmatic perspective, which may be attained through a means of assessment based on educational outcomes. Discusses two models…

  19. Life cycle assessment of waste management systems: Assessing technical externalities

    DEFF Research Database (Denmark)

    Brogaard, Line Kai-Sørensen

    The life cycle assessment (LCA) of a waste management system relies on many internal characteristics such as pollution control systems and recovery efficiencies. It also relies on technical externalities supporting the waste management system in terms of capital goods and energy and material...... for the primary and secondary production of materials, 366 datasets were gathered. The materials in focus were: paper, newsprint, cardboard, corrugated board, glass, aluminium, steel and plastics (HDPE, LDPE, LLDPE, PET, PS, PVC). Only one quarter of these data concerned secondary production, thus underlining...

  20. Risk Control of Offshore Installations. A Framework for the Establishment of Risk Indicators

    Energy Technology Data Exchange (ETDEWEB)

    Oeien, Knut

    2001-07-01

    Currently quantitative risk assessments are carried out to analyze the risk level of offshore installations and to evaluate whether or not the risk level is acceptable. By way of the quantitative risk analysis the risk status of a given installation is obtained. However, the risk status is obtained so infrequently that it is inadequate for risk control. It can be compared to economic control having the economic status presented about each fifth year, which is obviously inadequate. It is important to know the risk status because this may provide an early warning about the need for remedial actions. Without frequent information about the risk status, control of risk cannot be claimed. The main objective of this thesis has been the development of a framework for the establishment of risk indicators. These risk indicators provide a status of the risk level through measuring of changes in technical, operational and organizational factors important to risk, and is thus a means to control risk during operation of offshore petroleum installations. The framework consists of a technical methodology using the quantitative risk assessment as a basis, an organizational model, and an organizational quantification methodology. Technical risk indicators are established from the technical methodology covering the risk factors explicitly included in the quantitative risk assessment. Organizational risk indicators measure changes in the organizational risk factors included in the organizational model, but not included in the quantitative risk assessment. The organizational model is an extension to the risk model in the quantitative risk assessment. The organizational quantification methodology calculates the effect of the changes measured by the organizational risk indicators. The organizational model may also be applied as a qualitative tool for root cause analysis of incidents (process leaks). Other results are an intermediate-level expert judgment procedure applicable for

  1. C-Band Airport Surface Communications System Engineering-Initial High-Level Safety Risk Assessment and Mitigation

    Science.gov (United States)

    Zelkin, Natalie; Henriksen, Stephen

    2011-01-01

    This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed C-band (5091- to 5150-MHz) airport surface communication system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents an initial high-level safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the C-band communication system after the profile is finalized and system rollout timing is determined. A security risk assessment has been performed by NASA as a parallel activity. While safety analysis is concerned with a prevention of accidental errors and failures, the security threat analysis focuses on deliberate attacks. Both processes identify the events that affect operation of the system; and from a safety perspective the security threats may present safety risks.

  2. The Symbiose project: an integrated framework for performing environmental radiological risk assessment

    International Nuclear Information System (INIS)

    Gonze, M.A.; Mourlon, C.; Garcia-Sanchez, L.; Beaugelin, K.; Chen, T.; Le Dizes, S.

    2004-01-01

    Human health and ecological risk assessments usually require the integration of a wide range of environmental data and modelling approaches, with a varying level of detail dependent on the management objectives, the complexity of the site and the level of ignorance about the pollutant behaviour/toxicity. Like most scientists and assessors did it recently, we recognized the need for developing comprehensive, integrated and flexible approaches to risk assessment. To meet these needs, IRSN launched the Symbiose project (2002-2006) which aims first, at designing a framework for integrating and managing data, methods and knowledge of some relevance in radiological risk to humans/biota assessment studies, and second, at implementing this framework in an information management, modelling and calculation platform. Feasibility developments (currently completed) led to the specification of a fully integrated, object-oriented and hierarchical approach for describing the fate, transport and effect of radionuclides in spatially-distributed environmental systems. This innovative approach has then been implemented in a platform prototype, main components of which are a user-friendly and modular simulation environment (e.g. using GoldSim toolbox), and a hierarchical object-oriented biosphere database. Both conceptual and technical developments will be presented here. (author)

  3. Risk assessment in long-term storage of spent nuclear fuel

    International Nuclear Information System (INIS)

    Ahn, T.; Guttmann, J.; Mohseni, A.

    2013-01-01

    This paper presents probabilistic risk-informed approaches that the Nuclear Regulatory Commission (NRC) staff is planning to consider in preparing regulatory bases for long-term storage of spent nuclear fuel (SNF) for up to 300 years. Due to uncertainties associated with long-term SNF storage, the NRC is considering a probabilistic risk-informed approach as well as a deterministic design-based approach. The uncertainties considered here are primarily associated with materials aging of the canister and SNF in the cask system during long-term storage of SNF. This paper discusses some potential risk contributors involved in long-term SNF storage. Methods of performance evaluation are presented that assess the various types of risks involved. They include deterministic evaluation, probabilistic evaluation, and consequence assessment under normal conditions and the conditions of accidents and natural hazards. Some potentially important technical issues resulting from the consideration of a probabilistic risk-informed evaluation of the cask system performance are discussed for the canister and SNF integrity. These issues are also discussed in comparison with the deterministic approach for comparison purposes, as appropriate. Probabilistic risk-informed methods can provide insights that deterministic methods may not capture. Two specific examples include stress corrosion cracking of the canister and hydrogen-induced cladding failure. These examples are discussed in more detail, in terms of their effects on radionuclide release and nuclear subcriticality associated with the failure. The plan to consider the probabilistic risk-informed approaches is anticipated to provide helpful regulatory insights for long-term storage of SNF that provide reasonable assurance for public health and safety. (authors)

  4. Air Risk Information Support Center

    Energy Technology Data Exchange (ETDEWEB)

    Shoaf, C.R.; Guth, D.J. [Environmental Protection Agency, Washington, DC (United States)

    1990-12-31

    The Air Risk Information Support Center (Air RISC) was initiated in early 1988 by the US Environmental Protection Agency`s (EPA) Office of Health and Environmental Assessment (OHEA) and the Office of Air Quality Planning and Standards (OAQPS) as a technology transfer effort that would focus on providing information to state and local environmental agencies and to EPA Regional Offices in the areas of health, risk, and exposure assessment for toxic air pollutants. Technical information is fostered and disseminated by Air RISCs three primary activities: (1) a {open_quotes}hotline{close_quotes}, (2) quick turn-around technical assistance projects, and (3) general technical guidance projects. 1 ref., 2 figs.

  5. Trust, emotion, sex, politics, and science: surveying the risk-assessment battlefield.

    Science.gov (United States)

    Slovic, P

    1999-08-01

    Risk management has become increasingly politicized and contentious. Polarized views, controversy, and conflict have become pervasive. Research has begun to provide a new perspective on this problem by demonstrating the complexity of the concept "risk" and the inadequacies of the traditional view of risk assessment as a purely scientific enterprise. This paper argues that danger is real, but risk is socially constructed. Risk assessment is inherently subjective and represents a blending of science and judgment with important psychological, social, cultural, and political factors. In addition, our social and democratic institutions, remarkable as they are in many respects, breed distrust in the risk arena. Whoever controls the definition of risk controls the rational solution to the problem at hand. If risk is defined one way, then one option will rise to the top as the most cost-effective or the safest or the best. If it is defined another way, perhaps incorporating qualitative characteristics and other contextual factors, one will likely get a different ordering of action solutions. Defining risk is thus an exercise in power. Scientific literacy and public education are important, but they are not central to risk controversies. The public is not irrational. Their judgments about risk are influenced by emotion and affect in a way that is both simple and sophisticated. The same holds true for scientists. Public views are also influenced by worldviews, ideologies, and values; so are scientists' views, particularly when they are working at the limits of their expertise. The limitations of risk science, the importance and difficulty of maintaining trust, and the complex, sociopolitical nature of risk point to the need for a new approach--one that focuses upon introducing more public participation into both risk assessment and risk decision making in order to make the decision process more democratic, improve the relevance and quality of technical analysis, and increase

  6. Trust, Emotion, Sex, Politics, and Science: Surveying the Risk-Assessment Battlefield

    Energy Technology Data Exchange (ETDEWEB)

    Slovic, Paul [Decision Research, Eugene, OR (United States)

    2001-07-01

    Risk management has become increasingly politicized and contentious. Polarized views, controversy, and conflict have become pervasive. Research has begun to provide a new perspective on this problem by demonstrating the complexity of the concept 'risk' and the inadequacies of the traditional view of risk assessment as a purely scientific enterprise. This paper argues that danger is real, but risk is socially constructed. Risk assessment is inherently subjective and represents a blending of science and judgment with important psychological, social, cultural, and political factors. In addition, our social and democratic institutions, remarkable as they are in many respects, breed distrust in the risk arena. Whoever controls the definition of risk controls the rational solution to the problem at hand. If risk is defined one way, then one option will rise to the top as the most cost-effective or the safest or the best. If it is defined another way, perhaps incorporating qualitative characteristics and other contextual factors, one will likely get a different ordering of action solutions. Defining risk is thus an exercise in power. Scientific literacy and public education are important, but they are not central to risk controversies. The public is not irrational. Their judgments about risk are influenced by emotion and affect in a way that is both simple and sophisticated. The same holds true for scientists. Public views are also influenced by world views, ideologies, and values; so are scientists' views, particularly when they are working at the limits of their expertise. The limitations of risk science, the importance and difficulty of maintaining trust, and the complex, sociopolitical nature of risk point to the need for a new approach-one that focuses upon introducing more public participation into both risk assessment and risk decision making in order to make the decision process more democratic, improve the relevance and quality of technical

  7. Trust, Emotion, Sex, Politics, and Science: Surveying the Risk-Assessment Battlefield

    International Nuclear Information System (INIS)

    Slovic, Paul

    2001-01-01

    Risk management has become increasingly politicized and contentious. Polarized views, controversy, and conflict have become pervasive. Research has begun to provide a new perspective on this problem by demonstrating the complexity of the concept 'risk' and the inadequacies of the traditional view of risk assessment as a purely scientific enterprise. This paper argues that danger is real, but risk is socially constructed. Risk assessment is inherently subjective and represents a blending of science and judgment with important psychological, social, cultural, and political factors. In addition, our social and democratic institutions, remarkable as they are in many respects, breed distrust in the risk arena. Whoever controls the definition of risk controls the rational solution to the problem at hand. If risk is defined one way, then one option will rise to the top as the most cost-effective or the safest or the best. If it is defined another way, perhaps incorporating qualitative characteristics and other contextual factors, one will likely get a different ordering of action solutions. Defining risk is thus an exercise in power. Scientific literacy and public education are important, but they are not central to risk controversies. The public is not irrational. Their judgments about risk are influenced by emotion and affect in a way that is both simple and sophisticated. The same holds true for scientists. Public views are also influenced by world views, ideologies, and values; so are scientists' views, particularly when they are working at the limits of their expertise. The limitations of risk science, the importance and difficulty of maintaining trust, and the complex, sociopolitical nature of risk point to the need for a new approach-one that focuses upon introducing more public participation into both risk assessment and risk decision making in order to make the decision process more democratic, improve the relevance and quality of technical analysis, and increase

  8. Patient caries risk assessment

    DEFF Research Database (Denmark)

    Twetman, Svante; Fontana, Margherita

    2009-01-01

    Risk assessment is an essential component in the decision-making process for the correct prevention and management of dental caries. Multiple risk factors and indicators have been proposed as targets in the assessment of risk of future disease, varying sometimes based on the age group at which...... they are targeted. Multiple reviews and systematic reviews are available in the literature on this topic. This chapter focusses primarily on results of reviews based on longitudinal studies required to establish the accuracy of caries risk assessment. These findings demonstrate that there is a strong body...... of evidence to support that caries experience is still, unfortunately, the single best predictor for future caries development. In young children, prediction models which include a variety of risk factors seem to increase the accuracy of the prediction, while the usefulness of additional risk factors...

  9. Geographic patterns of at-risk species: A technical document supporting the USDA Forest Service Interim Update of the 2000 RPA Assessment

    Science.gov (United States)

    Curtis H. Flather; Michael S. Knowles; Jason McNees

    2008-01-01

    This technical document supports the Forest Service's requirement to assess the status of renewable natural resources as mandated by the Forest and Rangeland Renewable Resources Planning Act of 1974. It updates past reports on the trends and geographic patterns of species formally listed as threatened or endangered under the Endangered Species Act of 1973. We...

  10. Risk Assessment Stability: A Revalidation Study of the Arizona Risk/Needs Assessment Instrument

    Science.gov (United States)

    Schwalbe, Craig S.

    2009-01-01

    The actuarial method is the gold standard for risk assessment in child welfare, juvenile justice, and criminal justice. It produces risk classifications that are highly predictive and that may be robust to sampling error. This article reports a revalidation study of the Arizona Risk/Needs Assessment instrument, an actuarial instrument for juvenile…

  11. Development of Risk Assessment Matrix for NASA Engineering and Safety Center

    Science.gov (United States)

    Malone, Roy W., Jr.; Moses, Kelly

    2004-01-01

    This paper describes a study, which had as its principal goal the development of a sufficiently detailed 5 x 5 Risk Matrix Scorecard. The purpose of this scorecard is to outline the criteria by which technical issues can be qualitatively and initially prioritized. The tool using this score card has been proposed to be one of the information resources the NASA Engineering and Safety Center (NESC) takes into consideration when making decisions with respect to incoming information on safety concerns across the entire NASA agency. The contents of this paper discuss in detail each element of the risk matrix scorecard, definitions for those elements and the rationale behind the development of those definitions. This scorecard development was performed in parallel with the tailoring of the existing Futron Corporation Integrated Risk Management Application (IRMA) software tool. IRMA was tailored to fit NESC needs for evaluating incoming safety concerns and was renamed NESC Assessment Risk Management Application (NAFMA) which is still in developmental phase.

  12. Application of non-dose/risk indicators for confidence-building in the H12 safety assessment

    International Nuclear Information System (INIS)

    Miyahara, K.; Makino, H.; Takasu, A.; Naito, M.; Umeke, H.; Wakasugi, K.; Ishiguro, K.

    2002-01-01

    In the H12 study, non-dose/risk safety indicators have also been considered with a view to increasing confidence in the safety assessment. The H12 safety assessment considers system evolution for a range of scenarios; not only normal groundwater scenarios but also isolation failure scenarios due to unlikely natural disruptive events. The calculated nuclide concentrations and fluxes in the surface environment for the reference groundwater scenario were compared with measurements of naturally occurring nuclides. This comparison indicated that the concentration and fluxes of radionuclides released from the repository would be several orders of magnitude lower than those of natural radionuclides. There may exist cases, such as some natural disruptive events, where the likelihood of occurrence is extremely low and the 'Reference Biosphere' approach is difficult to be applied for biosphere modelling. The use of qualitative assessment to allow comparison with naturally occurring nuclides based on observations of natural systems may play a role in supporting the robustness of the system concept. These examples suggest that relevant application of these non-dose/risk indicators supports a more robust case. An advantage to applying such indicators is that both technical and non-technical audiences can judge the relative, long-term impact of a deep geological repository. (author)

  13. Sudbury soils study : human health and ecological risk assessment : a case study in science, process and perception

    International Nuclear Information System (INIS)

    Wren, C.

    2009-01-01

    This presentation discussed the public relations and public opinion strategies used as part of a soils study conducted to assess the risk of mining activities in the Sudbury region to human health and the environment. The human health risk assessment (HHRA) study was conducted and administered by a multi-stakeholder technical committee attended by the public. The study was comprised of extensive soil collection and analysis; a review of historical soils data; and extensive human health and ecological risk assessments. Extensive sampling was also conducted on air, dust, and locally-produced foods. A public advisory committee was formed to disseminate scientific information to the community. Scientific data obtained in the study were reviewed by experts in various fields. Results of the study were also peer-reviewed by an independent expert review panel comprised of leading specialists in human health, toxicology, speciation, and risk assessment. The study showed that the identified risks were over-estimated in the interest of protecting human health. It was concluded that the HHRA's findings were generally accepted by the public. tabs., figs

  14. Induced seismicity and carbon storage: Risk assessment and mitigation strategies

    Energy Technology Data Exchange (ETDEWEB)

    White, Joshua A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Foxall, William [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Bachmann, Corinne [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Chiaramonte, Laura [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Daley, Thomas M. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-01-28

    Geologic carbon storage (GCS) is widely recognized as an important strategy to reduce atmospheric carbon dioxide (CO2) emissions. Like all technologies, however, sequestration projects create a number of potential environmental and safety hazards that must be addressed. These include earthquakes—from microseismicity to large, damaging events—that can be triggered by altering pore-pressure conditions in the subsurface. To date, measured seismicity due to CO2 injection has been limited to a few modest events, but the hazard exists and must be considered. There are important similarities between CO2 injection and fluid injection from other applications that have induced significant events—e.g. geothermal systems, waste-fluid injection, hydrocarbon extraction, and others. There are also important distinctions among these technologies that should be considered in a discussion of seismic hazard. This report focuses on strategies for assessing and mitigating risk during each phase of a CO2 storage project. Four key risks related to fault reactivation and induced seismicity were considered. Induced slip on faults could potentially lead to: (1) infrastructure damage, (2) a public nuisance, (3) brine-contaminated drinking water, and (4) CO2-contaminated drinking water. These scenarios lead to different types of damage—to property, to drinking water quality, or to the public welfare. Given these four risks, this report focuses on strategies for assessing (and altering) their likelihoods of occurrence and the damage that may result. This report begins with an overview of the basic physical mechanisms behind induced seismicity. This science basis—and its gaps—is crucial because it forms the foundation for risk assessment and mitigation. Available techniques for characterizing and monitoring seismic behavior are also described. Again, this technical basis—and its limitations—must be factored into the risk

  15. A mechanism to assess the relationship between socio-technical ...

    African Journals Online (AJOL)

    A mechanism to assess the relationship between socio-technical congruence and project performance in incremental model. W.A.W.M. Sobri, S.S.M. Fauzi, M.H.N.M. Nasir, R Ahmad, A.J. Suali. Abstract. No Abstract. Keywords: coordination; software development; software project; software engineering project; ...

  16. Handbook of methods for risk-based analyses of technical specifications

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Mankamo, T.; Vesely, W.E.

    1994-12-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements are based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while a few may not be conducive to safety. The US Nuclear Regulatory Commission (USNRC) Office of Research has sponsored research to develop systematic risk-based methods to improve various aspects of TS requirements. This handbook summarizes these risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), scheduled or preventive maintenance, action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), and management of plant configurations resulting from outages of systems, or components. For each topic, the handbook summarizes analytic methods with data needs, outlines the insights to be gained, lists additional references, and gives examples of evaluations

  17. Handbook of methods for risk-based analyses of technical specifications

    Energy Technology Data Exchange (ETDEWEB)

    Samanta, P.K.; Kim, I.S. [Brookhaven National Lab., Upton, NY (United States); Mankamo, T. [Avaplan Oy, Espoo (Finland); Vesely, W.E. [Science Applications International Corp., Dublin, OH (United States)

    1994-12-01

    Technical Specifications (TS) requirements for nuclear power plants define the Limiting Conditions for Operation (LCOs) and Surveillance Requirements (SRs) to assure safety during operation. In general, these requirements are based on deterministic analysis and engineering judgments. Experiences with plant operation indicate that some elements of the requirements are unnecessarily restrictive, while a few may not be conducive to safety. The US Nuclear Regulatory Commission (USNRC) Office of Research has sponsored research to develop systematic risk-based methods to improve various aspects of TS requirements. This handbook summarizes these risk-based methods. The scope of the handbook includes reliability and risk-based methods for evaluating allowed outage times (AOTs), scheduled or preventive maintenance, action statements requiring shutdown where shutdown risk may be substantial, surveillance test intervals (STIs), and management of plant configurations resulting from outages of systems, or components. For each topic, the handbook summarizes analytic methods with data needs, outlines the insights to be gained, lists additional references, and gives examples of evaluations.

  18. NanoSafer vs. 1.1 - Nanomaterial risk assessment using first order modeling

    DEFF Research Database (Denmark)

    Jensen, Keld A.; Saber, Anne T.; Kristensen, Henrik V.

    2013-01-01

    for safe use of MN based on first order modeling. The hazard and case specific exposure as sessments are combined for an integrated risk evaluation and final control banding. Requested material da ta are typically available from the producers’ technical information sheets. The hazard data are given...... using the work room dimensions , ventilation rate, powder use rate, duration, and calculated or given emission rates. The hazard sc aling is based on direct assessment. The exposure band is derived from estimated acute and work day expo sure levels divided by a nano OEL calculated from the OEL...... to construct user specific work scenarios for exposure assessment is considered a highly versatile approach....

  19. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  20. Electromagnetic fields: risk assessment and occupational diseases in Italy

    Energy Technology Data Exchange (ETDEWEB)

    Filosa, L.; Frusteri, L. [Risk Assessment and Prevention, Technical Advisory Dept., Italian Workers Compensation Authority, Rome (Italy)

    2006-07-01

    Every year about 8000 occupational diseases are accepted in Italy by I.N.A.I.L., the Italian Workers' Compensation Authority. The occupational diseases are caused by different agents (chemical, biological, physical) but only a very little percentage resulted to be caused by non ionizing radiations. In this paper the Authors report an analysis of occupational diseases caused by non ionising radiations denounced to I.N.A.I.L. and compensated. It is discussed the Italian situation in light of the controversial studies related to the link between exposure and health effects. Because of the uncertainty about an E.M.F. - health link, the main effort is to determine the probability and seriousness of E.M.F. hazard and to realize an accurate risk assessment at workplace, which is one of the main objectives pursued by I.N.A.I.L. Technical Advisory Department for Risk Assessment and Prevention. Moreover, in this paper it is also reported the state of advancement of Italian legislation on health protection against non ionizing radiations at workplace in view of the new European Directive (2004/40/C.E.). (authors)

  1. Electromagnetic fields: risk assessment and occupational diseases in Italy

    International Nuclear Information System (INIS)

    Filosa, L.; Frusteri, L.

    2006-01-01

    Every year about 8000 occupational diseases are accepted in Italy by I.N.A.I.L., the Italian Workers' Compensation Authority. The occupational diseases are caused by different agents (chemical, biological, physical) but only a very little percentage resulted to be caused by non ionizing radiations. In this paper the Authors report an analysis of occupational diseases caused by non ionising radiations denounced to I.N.A.I.L. and compensated. It is discussed the Italian situation in light of the controversial studies related to the link between exposure and health effects. Because of the uncertainty about an E.M.F. - health link, the main effort is to determine the probability and seriousness of E.M.F. hazard and to realize an accurate risk assessment at workplace, which is one of the main objectives pursued by I.N.A.I.L. Technical Advisory Department for Risk Assessment and Prevention. Moreover, in this paper it is also reported the state of advancement of Italian legislation on health protection against non ionizing radiations at workplace in view of the new European Directive (2004/40/C.E.). (authors)

  2. Technical Standards on the Safety Assessment of a HLW Repository in Other Countries

    International Nuclear Information System (INIS)

    Lee, Sung Ho; Hwang, Yong Soo

    2009-01-01

    The basic function of HLW disposal system is to prevent excessive radio-nuclides being leaked from the repository in a short time. To do this, many technical standards should be developed and established on the components of disposal system. Safety assessment of a repository is considered as one of technical standards, because it produces quantitative results of the future evolution of a repository based on a reasonably simplified model. In this paper, we investigated other countries' regulations related to safely assessment focused on the assessment period, radiation dose limits and uncertainties of the assessment. Especially, in the investigation process of the USA regulations, the USA regulatory bodies' approach to assessment period and peak dose is worth taking into account in case of a conflict between peak dose from safety assessment and limited value in regulation.

  3. Cost, Time, and Risk Assessment of Different Wave Energy Converter Technology Development Trajectories: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Weber, Jochem W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Laird, Daniel [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Costello, Ronan [Wave Venture; Roberts, Jesse [Sandia National Laboratories; Bull, Diana [Sandia National Laboratories; Babarit, Aurelien [Ecole Centrale de Nantes; Nielsen, Kim [Ramboll; Ferreira, Claudio Bittencourt [DNV-GL; Kennedy, Ben [Wave Venture

    2017-09-14

    This paper presents a comparative assessment of three fundamentally different wave energy converter technology development trajectories. The three technology development trajectories are expressed and visualised as a function of technology readiness levels and technology performance levels. The assessment shows that development trajectories that initially prioritize technology readiness over technology performance are likely to require twice the development time, consume a threefold of the development cost, and are prone to a risk of technical or commercial failure of one order of magnitude higher than those development trajectories that initially prioritize technology performance over technology readiness.

  4. Risk assessment: 'A consumer's perspective'

    International Nuclear Information System (INIS)

    Waterhouse, Rachel

    1992-01-01

    The paper assesses the concept of risk, risk assessment and tolerability of risk from consumer point of view. Review of existing UK and EC directives on certain products and appliances is also covered

  5. Risk assessment: 'A consumer's perspective'

    Energy Technology Data Exchange (ETDEWEB)

    Waterhouse, Rachel [Consumer' s Association, Health and Safety Commission (United Kingdom)

    1992-07-01

    The paper assesses the concept of risk, risk assessment and tolerability of risk from consumer point of view. Review of existing UK and EC directives on certain products and appliances is also covered.

  6. Technical skills assessment toolbox: a review using the unitary framework of validity.

    Science.gov (United States)

    Ghaderi, Iman; Manji, Farouq; Park, Yoon Soo; Juul, Dorthea; Ott, Michael; Harris, Ilene; Farrell, Timothy M

    2015-02-01

    The purpose of this study was to create a technical skills assessment toolbox for 35 basic and advanced skills/procedures that comprise the American College of Surgeons (ACS)/Association of Program Directors in Surgery (APDS) surgical skills curriculum and to provide a critical appraisal of the included tools, using contemporary framework of validity. Competency-based training has become the predominant model in surgical education and assessment of performance is an essential component. Assessment methods must produce valid results to accurately determine the level of competency. A search was performed, using PubMed and Google Scholar, to identify tools that have been developed for assessment of the targeted technical skills. A total of 23 assessment tools for the 35 ACS/APDS skills modules were identified. Some tools, such as Operative Performance Rating System (OSATS) and Objective Structured Assessment of Technical Skill (OPRS), have been tested for more than 1 procedure. Therefore, 30 modules had at least 1 assessment tool, with some common surgical procedures being addressed by several tools. Five modules had none. Only 3 studies used Messick's framework to design their validity studies. The remaining studies used an outdated framework on the basis of "types of validity." When analyzed using the contemporary framework, few of these studies demonstrated validity for content, internal structure, and relationship to other variables. This study provides an assessment toolbox for common surgical skills/procedures. Our review shows that few authors have used the contemporary unitary concept of validity for development of their assessment tools. As we progress toward competency-based training, future studies should provide evidence for various sources of validity using the contemporary framework.

  7. Using risk assessment in periodontics.

    Science.gov (United States)

    Woodman, Alan J

    2014-08-01

    Risk assessment has become a regular feature in both dental practice and society as a whole, and principles used to assess risk in society are similar to those used in a clinical setting. Although the concept of risk assessment as a prognostic indicator for periodontal disease incidence and activity is well established in the management of periodontitis, the use of risk assessment to manage the practical treatment of periodontitis and its sequelae appears to have less foundation. A simple system of initial risk assessment - building on the use of the Basic Periodontal Examination (BPE), clinical, medical and social factors - is described, linked to protocols for delivering care suited to general dental practice and stressing the role of long-term supportive care. The risks of not treating the patient are considered, together with the possible causes of failure, and the problems of successful treatment are illustrated by the practical management of post-treatment recession.

  8. A total risk assessment methodology for security assessment

    International Nuclear Information System (INIS)

    Auilar, Richard; Pless, Daniel J.; Kaplan, Paul Garry; Silva, Consuelo Juanita; Rhea, Ronald Edward; Wyss, Gregory Dane; Conrad, Stephen Hamilton

    2009-01-01

    Sandia National Laboratories performed a two-year Laboratory Directed Research and Development project to develop a new collaborative risk assessment method to enable decision makers to fully consider the interrelationships between threat, vulnerability, and consequence. A five-step Total Risk Assessment Methodology was developed to enable interdisciplinary collaborative risk assessment by experts from these disciplines. The objective of this process is promote effective risk management by enabling analysts to identify scenarios that are simultaneously achievable by an adversary, desirable to the adversary, and of concern to the system owner or to society. The basic steps are risk identification, collaborative scenario refinement and evaluation, scenario cohort identification and risk ranking, threat chain mitigation analysis, and residual risk assessment. The method is highly iterative, especially with regard to scenario refinement and evaluation. The Total Risk Assessment Methodology includes objective consideration of relative attack likelihood instead of subjective expert judgment. The 'probability of attack' is not computed, but the relative likelihood for each scenario is assessed through identifying and analyzing scenario cohort groups, which are groups of scenarios with comparable qualities to the scenario being analyzed at both this and other targets. Scenarios for the target under consideration and other targets are placed into cohort groups under an established ranking process that reflects the following three factors: known targeting, achievable consequences, and the resources required for an adversary to have a high likelihood of success. The development of these target cohort groups implements, mathematically, the idea that adversaries are actively choosing among possible attack scenarios and avoiding scenarios that would be significantly suboptimal to their objectives. An adversary who can choose among only a few comparable targets and scenarios (a

  9. Risk assessment in a foundry unit by energy trace and barrier analysis method (ETBA

    Directory of Open Access Journals (Sweden)

    S.A. Ayati

    2010-01-01

    Full Text Available Background and aimsAs a Development of Industrial process, human, environment,equipment, material and validity of system has been exposed to hazardous conditions. Regards of32.3 percent of occupations in industries, this study focused on risk assessment of foundry unit byenergy trace and barrier analysis (ETBA method and presented approaches to control of accident.Methodsthe recent study is as a case study one to risk assessment in a foundry unit in Qazvinindustrial city in1387. In this study risks were founded by ETBA method and evaluated by MILSTD-882B. Data were collected by direct observations, interview with workers and supervisorand engineers, walking-talking through method, documents investigation of operationalprocessors, preventive maintenances, equipment technical properties, accidental and medicaldocuments. Finally ETBA worksheets completed.Findingstotally 154 risks has been found. 40 from total are been unacceptable risk, 68unfavorable and also 46 acceptable but with remediation action. Casting workshop had risks morethan other workshops (with 74 identified risks.Potential and heat energies were founded as mosthazardous energies, with respectively 51 and 38 risk cases.ConclusionThis study recommended to be done actions for identification and control risk,such as: safety training, occupation training, preventive maintenance, contract safety, safetycommunication and safety audit group.

  10. Introduction to insurance mathematics technical and financial features of risk transfers

    CERN Document Server

    Olivieri, Annamaria

    2015-01-01

    This second edition expands the first chapters, which focus on the approach to risk management issues discussed in the first edition, to offer readers a better understanding of the risk management process and the relevant quantitative phases. In the following chapters the book examines life insurance, non-life insurance and pension plans, presenting the technical and financial aspects of risk transfers and insurance without the use of complex mathematical tools.   The book is written in a comprehensible style making it easily accessible to advanced undergraduate and graduate students in Economics, Business and Finance, as well as undergraduate students in Mathematics who intend starting on an actuarial qualification path. With the systematic inclusion of practical topics, professionals will find this text useful when working in insurance and pension related areas, where investments, risk analysis and financial reporting play a major role.

  11. Supporting Risk Assessment: Accounting for Indirect Risk to Ecosystem Components.

    Directory of Open Access Journals (Sweden)

    Cathryn Clarke Murray

    Full Text Available The multi-scalar complexity of social-ecological systems makes it challenging to quantify impacts from human activities on ecosystems, inspiring risk-based approaches to assessments of potential effects of human activities on valued ecosystem components. Risk assessments do not commonly include the risk from indirect effects as mediated via habitat and prey. In this case study from British Columbia, Canada, we illustrate how such "indirect risks" can be incorporated into risk assessments for seventeen ecosystem components. We ask whether (i the addition of indirect risk changes the at-risk ranking of the seventeen ecosystem components and if (ii risk scores correlate with trophic prey and habitat linkages in the food web. Even with conservative assumptions about the transfer of impacts or risks from prey species and habitats, the addition of indirect risks in the cumulative risk score changes the ranking of priorities for management. In particular, resident orca, Steller sea lion, and Pacific herring all increase in relative risk, more closely aligning these species with their "at-risk status" designations. Risk assessments are not a replacement for impact assessments, but-by considering the potential for indirect risks as we demonstrate here-they offer a crucial complementary perspective for the management of ecosystems and the organisms within.

  12. 24 CFR 35.315 - Risk assessment.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Risk assessment. 35.315 Section 35... Provided by a Federal Agency Other Than HUD § 35.315 Risk assessment. Each owner shall complete a risk assessment in accordance with 40 CFR 745.227(d). Each risk assessment shall be completed in accordance with...

  13. Exploring the uncertainties in cancer risk assessment using the integrated probabilistic risk assessment (IPRA) approach.

    Science.gov (United States)

    Slob, Wout; Bakker, Martine I; Biesebeek, Jan Dirk Te; Bokkers, Bas G H

    2014-08-01

    Current methods for cancer risk assessment result in single values, without any quantitative information on the uncertainties in these values. Therefore, single risk values could easily be overinterpreted. In this study, we discuss a full probabilistic cancer risk assessment approach in which all the generally recognized uncertainties in both exposure and hazard assessment are quantitatively characterized and probabilistically evaluated, resulting in a confidence interval for the final risk estimate. The methodology is applied to three example chemicals (aflatoxin, N-nitrosodimethylamine, and methyleugenol). These examples illustrate that the uncertainty in a cancer risk estimate may be huge, making single value estimates of cancer risk meaningless. Further, a risk based on linear extrapolation tends to be lower than the upper 95% confidence limit of a probabilistic risk estimate, and in that sense it is not conservative. Our conceptual analysis showed that there are two possible basic approaches for cancer risk assessment, depending on the interpretation of the dose-incidence data measured in animals. However, it remains unclear which of the two interpretations is the more adequate one, adding an additional uncertainty to the already huge confidence intervals for cancer risk estimates. © 2014 Society for Risk Analysis.

  14. Assessing neurosurgical non-technical skills: an exploratory study of a new behavioural marker system.

    Science.gov (United States)

    Michinov, Estelle; Jamet, Eric; Dodeler, Virginie; Haegelen, Claire; Jannin, Pierre

    2014-10-01

    The management of non-technical skills is a major factor affecting teamwork quality and patient safety. This article presents a behavioural marker system for assessing neurosurgical non-technical skills (BMS-NNTS). We tested the BMS during deep brain stimulation surgery. We developed the BMS in three stages. First, we drew up a provisional assessment tool based on the literature and observation tools developed for other surgical specialties. We then analysed videos made in an operating room (OR) during deep brain stimulation operations in order to ensure there were no significant omissions from the skills list. Finally, we used five videos of operations to identify the behavioural markers of non-technical skills in verbal communications. Analyses of more than six hours of observations revealed 3515 behaviours from which we determined the neurosurgeon's non-technical skills behaviour pattern. The neurosurgeon frequently engaged in explicit coordination, situation awareness and leadership behaviours. In addition, the neurosurgeon's behaviours differed according to the stage of the operation and the OR staff members with whom she was communicating. Our behavioural marker system provides a structured approach to assessing non-technical skills in the field of neurosurgery. It can also be transferred to other surgical specialties and used in surgeon training curricula. © 2014 John Wiley & Sons, Ltd.

  15. Customisation of an instrument to assess anaesthesiologists' non-technical skills.

    Science.gov (United States)

    Jepsen, Rikke M H G; Spanager, Lene; Lyk-Jensen, Helle T; Dieckmann, Peter; Østergaard, Doris

    2015-02-22

    The objectives of the study were to identify Danish anaesthesiologists' non-technical skills and to customise the Scottish-developed Anaesthetists' Non-Technical Skills instrument for Danish anaesthesiologists. Six semi-structured group interviews were conducted with 31 operating room team members: anaes-thesiologists, nurse anaesthetists, surgeons, and scrub nurses. Interviews were transcribed verbatim and analysed using directed content analysis. Anaesthesiologists' non-technical skills were identified, coded, and sorted using the original instrument as a basis. The resulting prototype instrument was discussed with anaesthesiologists from 17 centres to ensure face validity. Interviews lasted 46-67 minutes. Identified examples of anaesthesiologists' good or poor non-technical skills fit the four categories in the original instrument: situation awareness; decision making; team working; and task management. Anaesthesiologists' leadership role in the operating room was emphasised: the original 'Task Management' category was named 'Leadership'. One new element, 'Demonstrating self-awareness' was added under the category 'Situation Awareness'. Compared with the original instrument, half of the behavioural markers were new, which reflected that being aware of and communicating one's own abilities to the team; working systematically; and speaking up to avoid adverse events were important skills. The Anaesthetists' Non-Technical Skills instrument was customised to a Danish setting using the identified non-technical skills for anaesthesiologists and the original instrument as basis. The customised instrument comprises four categories and 16 underpinning elements supported by multiple behavioural markers. Identifying non-technical skills through semi-structured group interviews and analysing them using direct content analysis proved a useful method for customising an assessment instrument to another setting.

  16. Supporting Risk Assessment: Accounting for Indirect Risk to Ecosystem Components

    Science.gov (United States)

    Mach, Megan E.; Martone, Rebecca G.; Singh, Gerald G.; O, Miriam; Chan, Kai M. A.

    2016-01-01

    The multi-scalar complexity of social-ecological systems makes it challenging to quantify impacts from human activities on ecosystems, inspiring risk-based approaches to assessments of potential effects of human activities on valued ecosystem components. Risk assessments do not commonly include the risk from indirect effects as mediated via habitat and prey. In this case study from British Columbia, Canada, we illustrate how such “indirect risks” can be incorporated into risk assessments for seventeen ecosystem components. We ask whether (i) the addition of indirect risk changes the at-risk ranking of the seventeen ecosystem components and if (ii) risk scores correlate with trophic prey and habitat linkages in the food web. Even with conservative assumptions about the transfer of impacts or risks from prey species and habitats, the addition of indirect risks in the cumulative risk score changes the ranking of priorities for management. In particular, resident orca, Steller sea lion, and Pacific herring all increase in relative risk, more closely aligning these species with their “at-risk status” designations. Risk assessments are not a replacement for impact assessments, but—by considering the potential for indirect risks as we demonstrate here—they offer a crucial complementary perspective for the management of ecosystems and the organisms within. PMID:27632287

  17. Avalanche risk assessment in Russia

    Science.gov (United States)

    Komarov, Anton; Seliverstov, Yury; Sokratov, Sergey; Glazovskaya, Tatiana; Turchaniniva, Alla

    2017-04-01

    The avalanche prone area covers about 3 million square kilometers or 18% of total area of Russia and pose a significant problem in most mountain regions of the country. The constant growth of economic activity, especially in the North Caucasus region and therefore the increased avalanche hazard lead to the demand of the large-scale avalanche risk assessment methods development. Such methods are needed for the determination of appropriate avalanche protection measures as well as for economic assessments during all stages of spatial planning of the territory. The requirement of natural hazard risk assessments is determined by the Federal Law of Russian Federation. However, Russian Guidelines (SP 11-103-97; SP 47.13330.2012) are not clearly presented concerning avalanche risk assessment calculations. A great size of Russia territory, vast diversity of natural conditions and large variations in type and level of economic development of different regions cause significant variations in avalanche risk values. At the first stage of research the small scale avalanche risk assessment was performed in order to identify the most common patterns of risk situations and to calculate full social risk and individual risk. The full social avalanche risk for the territory of country was estimated at 91 victims. The area of territory with individual risk values lesser then 1×10(-6) covers more than 92 % of mountain areas of the country. Within these territories the safety of population can be achieved mainly by organizational activities. Approximately 7% of mountain areas have 1×10(-6) - 1×10(-4) individual risk values and require specific mitigation measures to protect people and infrastructure. Territories with individual risk values 1×10(-4) and above covers about 0,1 % of the territory and include the most severe and hazardous mountain areas. The whole specter of mitigation measures is required in order to minimize risk. The future development of such areas is not recommended

  18. Risk assessment in international operations

    International Nuclear Information System (INIS)

    Stricklin, Daniela L.

    2008-01-01

    During international peace-keeping missions, a diverse number of non-battle hazards may be encountered, which range from heavily polluted areas, endemic disease, toxic industrial materials, local violence, traffic, and even psychological factors. Hence, elevated risk levels from a variety of sources are encountered during deployments. With the emphasis within the Swedish military moving from national defense towards prioritization of international missions in atypical environments, the risk of health consequences, including long term health effects, has received greater consideration. The Swedish military is interested in designing an optimal approach for assessment of health threats during deployments. The Medical Intelligence group at FOI CBRN Security and Defence in Umea has, on request from and in collaboration with the Swedish Armed Forces, reviewed a variety of international health threat and risk assessment models for military operations. Application of risk assessment methods used in different phases of military operations will be reviewed. An overview of different international approaches used in operational risk management (ORM) will be presented as well as a discussion of the specific needs and constraints for health risk assessment in military operations. This work highlights the specific challenges of risk assessment that are unique to the deployment setting such as the assessment of exposures to a variety of diverse hazards concurrently

  19. Outage Risk Assessment and Management (ORAM) thermal-hydraulics toolkit

    International Nuclear Information System (INIS)

    Denny, V.E.; Wassel, A.T.; Issacci, F.; Pal Kalra, S.

    2004-01-01

    A PC-based thermal-hydraulic toolkit for use in support of outage optimization, management and risk assessment has been developed. This mechanistic toolkit incorporates simple models of key thermal-hydraulic processes which occur during an outage, such as recovery from or mitigation of outage upsets; this includes heat-up of water pools following loss of shutdown cooling, inadvertent drain down of the RCS, boiloff of coolant inventory, heatup of the uncovered core, and reflux cooling. This paper provides a list of key toolkit elements, briefly describes the technical basis and presents illustrative results for RCS transient behavior during reflux cooling, peak clad temperatures for an uncovered core and RCS response to loss of shutdown cooling. (author)

  20. Uncertainties in risk assessment at USDOE facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

    1994-01-01

    The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms{open_quote} risk assessment{close_quote} and{open_quote} risk management{close_quote} are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of {open_quotes}... the most significant data and uncertainties...{close_quotes} in an assessment. Significant data and uncertainties are {open_quotes}...those that define and explain the main risk conclusions{close_quotes}. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation.

  1. Uncertainties in risk assessment at USDOE facilities

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

    1994-01-01

    The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms open-quote risk assessment close-quote and open-quote risk management close-quote are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of open-quotes... the most significant data and uncertainties...close quotes in an assessment. Significant data and uncertainties are open-quotes...those that define and explain the main risk conclusionsclose quotes. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation

  2. Economic and Technical Assessment of Wood Biomass Fuel Gasification for Industrial Gas Production

    Energy Technology Data Exchange (ETDEWEB)

    Anastasia M. Gribik; Ronald E. Mizia; Harry Gatley; Benjamin Phillips

    2007-09-01

    This project addresses both the technical and economic feasibility of replacing industrial gas in lime kilns with synthesis gas from the gasification of hog fuel. The technical assessment includes a materials evaluation, processing equipment needs, and suitability of the heat content of the synthesis gas as a replacement for industrial gas. The economic assessment includes estimations for capital, construction, operating, maintenance, and management costs for the reference plant. To perform these assessments, detailed models of the gasification and lime kiln processes were developed using Aspen Plus. The material and energy balance outputs from the Aspen Plus model were used as inputs to both the material and economic evaluations.

  3. Deterministic quantitative risk assessment development

    Energy Technology Data Exchange (ETDEWEB)

    Dawson, Jane; Colquhoun, Iain [PII Pipeline Solutions Business of GE Oil and Gas, Cramlington Northumberland (United Kingdom)

    2009-07-01

    Current risk assessment practice in pipeline integrity management is to use a semi-quantitative index-based or model based methodology. This approach has been found to be very flexible and provide useful results for identifying high risk areas and for prioritizing physical integrity assessments. However, as pipeline operators progressively adopt an operating strategy of continual risk reduction with a view to minimizing total expenditures within safety, environmental, and reliability constraints, the need for quantitative assessments of risk levels is becoming evident. Whereas reliability based quantitative risk assessments can be and are routinely carried out on a site-specific basis, they require significant amounts of quantitative data for the results to be meaningful. This need for detailed and reliable data tends to make these methods unwieldy for system-wide risk k assessment applications. This paper describes methods for estimating risk quantitatively through the calibration of semi-quantitative estimates to failure rates for peer pipeline systems. The methods involve the analysis of the failure rate distribution, and techniques for mapping the rate to the distribution of likelihoods available from currently available semi-quantitative programs. By applying point value probabilities to the failure rates, deterministic quantitative risk assessment (QRA) provides greater rigor and objectivity than can usually be achieved through the implementation of semi-quantitative risk assessment results. The method permits a fully quantitative approach or a mixture of QRA and semi-QRA to suit the operator's data availability and quality, and analysis needs. For example, consequence analysis can be quantitative or can address qualitative ranges for consequence categories. Likewise, failure likelihoods can be output as classical probabilities or as expected failure frequencies as required. (author)

  4. Evaluation of thermal risk assessment

    International Nuclear Information System (INIS)

    Loos, J.J.; Perry, E.S.

    1993-01-01

    Risk assessment was done in 1983 to estimate the ecological hazard of increasing the generating load and thermal output of an electric generating station. Subsequently, long-term monitoring in the vicinity of the station allowed verification of the predictions made in the risk assessment. This presentation will review the efficacy of early risk assessment methods in producing useful predictions from a resource management point of view. In 1984, the Chalk Point Generating facility of the Potomac Electric Power Company increased it's median generating load by 100%. Prior to this operational change, the Academy of Natural Sciences of Philadelphia synthesized site specific data, model predictions, and results from literature to assess the risk of additional waste heat to the Patuxent River subestuary of Chesapeake Bay. Risk was expressed as the number of days per year that various species of fish and the blue crab would be expected to avoid the discharge vicinity. Accuracy of these predictions is assessed by comparing observed fish and crab distributions and their observed frequencies of avoidance to those predicted. It is concluded that the predictions of this early risk assessment were sufficiently accurate to produce a reliable resource management decision

  5. Technical and economic assessment of solar hybrid repowering. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    Public Service Company of New Mexico (PNM) has performed a Technical and Economic Assessment of Solar Hybrid Repowering under funding by the Department of Energy (DOE), the Electric Power Research Institute (EPRI), Western Energy Supply and Transmission (WEST) Associates, and a number of southwestern utilities. Solar hybrid repowering involves placement of solar hardware adjacent to and connected to existing gas- and oil-fueled electric generation units to displace some of or all the fossil fuel normally used during daylight hours. The subject study assesses the technical economic viability of the solar hybrid repowering concept within the southwestern United States and the PNM system. This document is a final report on the study and its results. The study was divided into the six primary tasks to allow a systematic investigation of the concept: (1) market survey and cost/benefit analysis, (2) study unit selection, (3) conceptual design and cost estimates, (4) unit economic analysis, (5) program planning, future phases, and (6) program management. Reeves Station No. 2 at Albuquerque, New Mexico, was selected for repowering with a design goal of 50 percent (25 MWe). The solar system design is based on the 10 MW solar central receiver pilot plant preliminary design for Barstow, California. SAN--1608-4-2 contains the technical drawings. (WHK)

  6. Baseline development, economic risk, and schedule risk: An integrated approach

    International Nuclear Information System (INIS)

    Tonkinson, J.A.

    1994-01-01

    The economic and schedule risks of Environmental Restoration (ER) projects are commonly analyzed toward the end of the baseline development process. Risk analysis is usually performed as the final element of the scheduling or estimating processes for the purpose of establishing cost and schedule contingency. However, there is an opportunity for earlier assessment of risks, during development of the technical scope and Work Breakdown Structure (WBS). Integrating the processes of risk management and baselining provides for early incorporation of feedback regarding schedule and cost risk into the proposed scope of work. Much of the information necessary to perform risk analysis becomes available during development of the technical baseline, as the scope of work and WBS are being defined. The analysis of risk can actually be initiated early on during development of the technical baseline and continue throughout development of the complete project baseline. Indeed, best business practices suggest that information crucial to the success of a project be analyzed and incorporated into project planning as soon as it is available and usable

  7. Management of Radioactive Spills in Nuclear Medicine; Teaching and Assessing with Objectively Structured Assessment of Technical Skills

    International Nuclear Information System (INIS)

    Hussain, Riffat Parveen

    2015-01-01

    Routine work in nuclear medicine requires the careful elution of radioactivity and its subsequent, storage and handling. Though all effort is maintained to prevent any “spill” of this radioactivity, accidents are bound to happen. The response to this spill is a methodically worked out a plan that is written and adopted as a “standard operating procedure.” This protocol is taught to all involved in the area of working as a mock drill/apprenticeship model. No formal evaluation of learning is in place except for the mock drills. The objectively structured assessment of technical skills (OSATS) is a variation on the Objective Structured Clinical Examination, which is a form of workplace based assessment. The OSATS is cited in the Accreditation Council of Graduate Medical Education evaluation toolbox on the website as the most desirable evaluation tool for the patient care topics. It is the objective of this paper is to introduce the “OSATS” for teaching, and assessment of the learning, of the protocol for the management of radioactive spill. As a review of the literature on the subject failed to reveal any such teaching protocol/material/document for this important technical skill, we hope that it may act as a landmark for the development of teaching and assessment of other technical skills also

  8. On risk assessment of energy production

    International Nuclear Information System (INIS)

    Kunii, Katsuhiko

    2005-07-01

    Today we cannot ignore the risk of health and/or environment by energy production such as power generation since the risk has been made large enough. In this report an information survey has been done in order to know the outline and points of risk assessment. Based on the information of reports and literature about risk assessment, have been surveyed mainly the external cost assessment of power generation (in which quantification of health and/or environment risk has been done), in addition, risks of disasters, accidents, investments, finance etc. and impacts of those risks on social activities. The remarks obtained by the survey are as follows: 1) Some of external cost assessment of power generation show different results even if the assessment conditions of technology, site, etc. are mostly the same. It is necessary to remark on the information such as basic data, model, background, application limit of assessment considering the reliability. 2) Especially it is considered that the reliability of risk assessment is not enough at present because of the lack of basic data. (author)

  9. Risk communication: Translating technically complex information to facilitate informed decision-making

    International Nuclear Information System (INIS)

    Sprecher, W.M.; Turner, E.

    1991-01-01

    Based on a review of risk communication and related literature, including policy material, this paper describes the newly revamped risk management program of the DOE's Office of Civilian Radioactive Waste Management (OCRWM), and some of the risk-related issues being confronted as the high-level waste management program moves forward. It also describes preliminary activities underway in which the OCRWM is developing strategies for risk communication. The authors offer a definition of risk management as comprised by the components of risk assessment and risk communication. The paper explores the discrepant views that experts and nonexperts have with respect to what constitutes a valid risk assessment model. By illustrating differences in the assessment of risk by experts and lay people, the paper demonstrates how these differences can create challenges in communicating risk and making decisions about risk. Finally, the paper discusses ways in which risk communication could be enhance, and elaborates on the OCRWM's commitment to improve its overall risk management efforts

  10. Application of objective clinical human reliability analysis (OCHRA) in assessment of technical performance in laparoscopic rectal cancer surgery.

    Science.gov (United States)

    Foster, J D; Miskovic, D; Allison, A S; Conti, J A; Ockrim, J; Cooper, E J; Hanna, G B; Francis, N K

    2016-06-01

    Laparoscopic rectal resection is technically challenging, with outcomes dependent upon technical performance. No robust objective assessment tool exists for laparoscopic rectal resection surgery. This study aimed to investigate the application of the objective clinical human reliability analysis (OCHRA) technique for assessing technical performance of laparoscopic rectal surgery and explore the validity and reliability of this technique. Laparoscopic rectal cancer resection operations were described in the format of a hierarchical task analysis. Potential technical errors were defined. The OCHRA technique was used to identify technical errors enacted in videos of twenty consecutive laparoscopic rectal cancer resection operations from a single site. The procedural task, spatial location, and circumstances of all identified errors were logged. Clinical validity was assessed through correlation with clinical outcomes; reliability was assessed by test-retest. A total of 335 execution errors identified, with a median 15 per operation. More errors were observed during pelvic tasks compared with abdominal tasks (p technical performance of laparoscopic rectal surgery.

  11. Defense Programs Transportation Risk Assessment

    International Nuclear Information System (INIS)

    Clauss, D.B.

    1994-01-01

    This paper provides an overview of the methodology used in a probabilistic transportation risk assessment conducted to assess the probabilities and consequences of inadvertent dispersal of radioactive materials arising from severe transportation accidents. The model was developed for the Defense Program Transportation Risk Assessment (DPTRA) study. The analysis incorporates several enhancements relative to previous risk assessments of hazardous materials transportation including newly-developed statistics on the frequencies and severities of tractor semitrailer accidents and detailed route characterization using the 1990 Census data

  12. NDT technical assessment for ISO 17025 and ISO 17020 certification

    International Nuclear Information System (INIS)

    Mohamad Pauzi Ismail

    2011-01-01

    ISO 17025 is an international standard that states the requirement criteria for testing and calibration laboratory, while ISO 17020 is for inspection body. Standard Malaysia is the accreditation body for both standards. The author involved in the technical assessment for both standards both in Nuclear Malaysia and outside. The experience in performing NDT assessment activity is explained and discussed. The comparison between both standards is also discussed. (author)

  13. Risk Factor Assessment Branch (RFAB)

    Science.gov (United States)

    The Risk Factor Assessment Branch (RFAB) focuses on the development, evaluation, and dissemination of high-quality risk factor metrics, methods, tools, technologies, and resources for use across the cancer research continuum, and the assessment of cancer-related risk factors in the population.

  14. Risk assessments ensure safer power

    Energy Technology Data Exchange (ETDEWEB)

    1982-02-19

    A growth industry is emerging devoted to the study and comparison of the economic, social and health risks posed by large industrial installations. Electricity generation is one area coming under particularly close scrutiny. Types of risk, ways of assessing risk and the difference between experts' analyses and the public perception of risk are given. An example of improved risk assessment helping to reduce deaths and injuries in coal mining is included.

  15. Light Water Reactor Sustainability Program Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Smith; James Knudsen; Bentley Harwood

    2013-08-01

    The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

  16. Assessing Nurse Anaesthetists' Non-Technical Skills in the operating room.

    Science.gov (United States)

    Lyk-Jensen, H T; Jepsen, R M H G; Spanager, L; Dieckmann, P; Østergaard, D

    2014-08-01

    Incident reporting and fieldwork in operating rooms have shown that some of the errors that arise in anaesthesia relate to inadequate use of non-technical skills. To provide a tool for training and feedback on nurse anaesthetists' non-technical skills, this study aimed to adapt the Anaesthetists' Non-Technical Skills (ANTS) as a behavioural marker system for the formative assessment of nurse anaesthetists' non-technical skills in the operating room. A qualitative approach with focus group interviews was used to identify the non-technical skills of nurse anaesthetists in the operating room. The interview data were transcribed verbatim. Directed content analysis was used to code and sort data deductively into the ANTS categories: task management, team working, situation awareness and decision making. The prototype named Nurse Anaesthetists' Non-Technical Skills (N-ANTS) was presented and discussed in a group of subject matter experts to ensure face validity. The N-ANTS system consists of the same four categories as ANTS and 15 underlying elements. Three to five good and poor behavioural markers for each element were identified. The headings and definitions of the categories and elements were adjusted to encompass the behavioural markers in N-ANTS. The differences that emerged mainly reflected statements regarding the establishment of role, competence, and task delegation. A behavioural marker system, N-ANTS, for nurse anaesthetists was adapted from a behavioural marker system, ANTS, for anaesthesiologists. © 2014 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  17. Integrating risk management and safety culture in a framework for risk informed decision making

    International Nuclear Information System (INIS)

    Nelson, W.R.

    2009-01-01

    Operators and regulators of nuclear power plants agree on the importance of maintaining safety and controlling accident risks. Effective safety and risk management requires treatment of both technical and organizational components. Probabilistic Risk Assessment (PRA) provides tools for technical risk management. However, organizational factors are not treated in PRA, but are addressed using different approaches. To bring both components together, a framework of Risk Informed Decision Making (RIDM) is needed. The objective tree structure of the International Atomic Energy Agency (IAEA) is a promising approach to combine both elements. Effective collaboration involving regulatory and industry groups is needed to accomplish the integration. (author)

  18. German data for risk based fire safety assessment

    International Nuclear Information System (INIS)

    Roewekamp, M.; Berg, H.P.

    1998-01-01

    Different types of data are necessary to perform risk based fire safety assessments and, in particular, to quantify the fire event tree considering the plant specific conditions. Data on fire barriers, fire detection and extinguishing, including also data on secondary effects of a fire, have to be used for quantifying the potential hazard and damage states. The existing German database on fires in nuclear power plants (NPPs) is very small. Therefore, in general generic data, mainly from US databases, are used for risk based safety assessments. Due to several differences in the plant design and conditions generic data can only be used as conservative assumptions. World-wide existing generic data on personnel failures in case of fire fighting have only to be adapted to the plant specific conditions inside the NPP to be investigated. In contrary, unavailabilities of fire barrier elements may differ strongly depending on different standards, testing requirements, etc. In addition, the operational behaviour of active fire protection equipment may vary depending on type and manufacturer. The necessity for more detailed and for additional plant specific data was the main reason for generating updated German data on the operational behaviour of active fire protection equipment/features in NPPs to support risk based fire safety analyses being recommended to be carried out as an additional tool to deterministic fire hazard analyses in the frame of safety reviews. The results of these investigations revealed a broader and more realistic database for technical reliability of active fire protection means, but improvements as well as collection of further data are still necessary. (author)

  19. Man, technology and risk: a study on intuitive risk assessment and attitudes towards nuclear energy

    Energy Technology Data Exchange (ETDEWEB)

    Renn, O

    1981-06-01

    Using the instruments of empirical social sciences, a cross-section study was conducted comprising experiments on qualitative risk characteristics, in-depth interviews on mechanisms of risk perception and representative surveys of the public on technical risk sources, in particular with regard to nuclear energy. The results of these studies show that person-related expectations in respect of risk consequences, the possibility of personal influencing control, the severeness of risk consequences and one's own risk propensity play a significant role in the evaluation of risks.

  20. A probabilistic seismic risk assessment procedure for nuclear power plants: (I) Methodology

    Science.gov (United States)

    Huang, Y.-N.; Whittaker, A.S.; Luco, N.

    2011-01-01

    A new procedure for probabilistic seismic risk assessment of nuclear power plants (NPPs) is proposed. This procedure modifies the current procedures using tools developed recently for performance-based earthquake engineering of buildings. The proposed procedure uses (a) response-based fragility curves to represent the capacity of structural and nonstructural components of NPPs, (b) nonlinear response-history analysis to characterize the demands on those components, and (c) Monte Carlo simulations to determine the damage state of the components. The use of response-rather than ground-motion-based fragility curves enables the curves to be independent of seismic hazard and closely related to component capacity. The use of Monte Carlo procedure enables the correlation in the responses of components to be directly included in the risk assessment. An example of the methodology is presented in a companion paper to demonstrate its use and provide the technical basis for aspects of the methodology. ?? 2011 Published by Elsevier B.V.

  1. Risk assessment

    DEFF Research Database (Denmark)

    Pedersen, Liselotte; Rasmussen, Kirsten; Elsass, Peter

    2010-01-01

    International research suggests that using formalized risk assessment methods may improve the predictive validity of professionals' predictions of risk of future violence. This study presents data on forensic psychiatric patients discharged from a forensic unit in Denmark in year 2001-2002 (n=107...... and the individual dynamic items strengthen the use of this scheme in clinical practice. (PsycINFO Database Record (c) 2010 APA, all rights reserved) (journal abstract)...

  2. Corrosion Assessment by Using Risk-Based Inspection Method for Petrochemical Plant - Practical Experience

    International Nuclear Information System (INIS)

    Choi, Song Chun; Song, Ki Hun

    2009-01-01

    Corrosion assessment has a number of uses but the use considered here is as a precursor to Risk-Based Inspection (RBI) planning. Systematic methods consisting of technical modules of RBI program were used to assess the effect of specific corrosion mechanism on the probability of failure in equipment of petrochemical plants. Especially in part of the damage and corrosion assessment, screening step involved evaluating the combinations of process conditions and construction materials for each equipment item in order to determine which damage mechanisms are potentially active. For general internal corrosion, either API 510 or API 570 was applied as the damage rate in the calculation to determine the remaining life and inspection frequency. In some cases, a measured rate of corrosion may not be available. The technical modules of RBI program employ default values for corrosion, typically derived from published data or from experience with similar processes, for use until inspection results are available. This paper describes the case study of corrosion and damage assessment by using RBI methodology in petrochemical plant. Specifically, this paper reports the methodology and the results of its application to the petrochemical units using the KGS-RBI TM program, developed by the Korea Gas Safety Corporation to suit Korean situation in conformity with API 581 Codes

  3. Sudden Cardiac Arrest (SCA) Risk Assessment

    Science.gov (United States)

    ... HRS Find a Specialist Share Twitter Facebook SCA Risk Assessment Sudden Cardiac Arrest (SCA) occurs abruptly and without ... people of all ages and health conditions. Start Risk Assessment The Sudden Cardiac Arrest (SCA) Risk Assessment Tool ...

  4. Integrated climate change risk assessment:

    DEFF Research Database (Denmark)

    Kaspersen, Per Skougaard; Halsnæs, Kirsten

    2017-01-01

    Risk assessments of flooding in urban areas during extreme precipitation for use in, for example, decision-making regarding climate adaptation, are surrounded by great uncertainties stemming from climate model projections, methods of downscaling and the assumptions of socioeconomic impact models...... to address the complex linkages between the different kinds of data required in assessing climate adaptation. It emphasizes that the availability of spatially explicit data can reduce the overall uncertainty of the risk assessment and assist in identifying key vulnerable assets. The usefulness...... of such a framework is demonstrated by means of a risk assessment of flooding from extreme precipitation for the city of Odense, Denmark. A sensitivity analysis shows how the presence of particularly important assets, such as cultural and historical heritage, may be addressed in assessing such risks. The output...

  5. Cognitive and Technical Skill Assessment in Surgical Education: a Changing Horizon.

    Science.gov (United States)

    Vergis, Ashley; Hardy, Krista

    2017-04-01

    Assessment is an integral component of training and credentialing surgeons for practice. Traditional methods of cognitive and technical appraisal are well established but have clear shortcomings. This review outlines the components of the surgical care assessment model, identifies the deficits of current evaluation techniques, and discusses novel and emerging technologies that attempt to ameliorate this educational void.

  6. Are engineered nano iron oxide particles safe? an environmental risk assessment by probabilistic exposure, effects and risk modeling.

    Science.gov (United States)

    Wang, Yan; Deng, Lei; Caballero-Guzman, Alejandro; Nowack, Bernd

    2016-12-01

    Nano iron oxide particles are beneficial to our daily lives through their use in paints, construction materials, biomedical imaging and other industrial fields. However, little is known about the possible risks associated with the current exposure level of engineered nano iron oxides (nano-FeOX) to organisms in the environment. The goal of this study was to predict the release of nano-FeOX to the environment and assess their risks for surface waters in the EU and Switzerland. The material flows of nano-FeOX to technical compartments (waste incineration and waste water treatment plants) and to the environment were calculated with a probabilistic modeling approach. The mean value of the predicted environmental concentrations (PECs) of nano-FeOX in surface waters in the EU for a worst-case scenario (no particle sedimentation) was estimated to be 28 ng/l. Using a probabilistic species sensitivity distribution, the predicted no-effect concentration (PNEC) was determined from ecotoxicological data. The risk characterization ratio, calculated by dividing the PEC by PNEC values, was used to characterize the risks. The mean risk characterization ratio was predicted to be several orders of magnitude smaller than 1 (1.4 × 10 - 4 ). Therefore, this modeling effort indicates that only a very limited risk is posed by the current release level of nano-FeOX to organisms in surface waters. However, a better understanding of the hazards of nano-FeOX to the organisms in other ecosystems (such as sediment) needs to be assessed to determine the overall risk of these particles to the environment.

  7. High-resolution assessment of global technical and economic hydropower potential

    NARCIS (Netherlands)

    Gernaat, David E.H.J.; Bogaart, Patrick W.; Vuuren, van Detlef P.; Biemans, Hester; Niessink, Robin

    2017-01-01

    Hydropower is the most important renewable energy source to date, providing over 72% of all renewable electricity globally. Yet, only limited information is available on the global potential supply of hydropower and the associated costs. Here we provide a high-resolution assessment of the technical

  8. Important Non-Technical Skills in Video-Assisted Thoracoscopic Surgery Lobectomy: Team Perspectives.

    Science.gov (United States)

    Gjeraa, Kirsten; Mundt, Anna S; Spanager, Lene; Hansen, Henrik J; Konge, Lars; Petersen, René H; Østergaard, Doris

    2017-07-01

    Safety in the operating room is dependent on the team's non-technical skills. The importance of non-technical skills appears to be different for minimally invasive surgery as compared with open surgery. The aim of this study was to identify which non-technical skills are perceived by team members to be most important for patient safety, in the setting of video-assisted thoracoscopic surgery (VATS) lobectomy. This was an explorative, semistructured interview-based study with 21 participants from all four thoracic surgery centers in Denmark that perform VATS lobectomy. Data analysis was deductive, and directed content analysis was used to code the text into the Oxford Non-Technical Skills system for evaluating operating teams' non-technical skills. The most important non-technical skills described by the VATS teams were planning and preparation, situation awareness, problem solving, leadership, risk assessment, and teamwork. These non-technical skills enabled the team to achieve shared mental models, which in turn facilitated their efforts to anticipate next steps. This was viewed as important by the participants as they saw VATS lobectomy as a high-risk procedure with complementary and overlapping scopes of practice between surgical and anesthesia subteams. This study identified six non-technical skills that serve as the foundation for shared mental models of the patient, the current situation, and team resources. These findings contribute three important additions to the shared mental model construct: planning and preparation, risk assessment, and leadership. Shared mental models are crucial for patient safety because they enable VATS teams to anticipate problems through adaptive patterns of both implicit and explicit coordination. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  9. Risk assessment of chemicals: A central European perspective

    Energy Technology Data Exchange (ETDEWEB)

    Bencko, Vladimir [Institute of Hygiene, 1st Medical Faculty, Charles University, Prague (Czech Republic); Ungvary, Gyoergy [National Institute of Occupational Health, Budapest (Hungary)

    1992-07-01

    Toxicometric Methodology held in Moscow in November 1985 and IPCS organized a Technical Review Meeting to compare CMEA and OECD Approaches to Toxicity Testing and Risk Assessment in Geneva, May 1987. A part of this effort was the publication of a Collection of Training Materials in Preventive Toxicology in the USSR within the UNEP/IRPTC project, Control of Hazards Posed by Chemicals to Human Health and the Environment (UNEP/IRPTC 1984)

  10. Risk assessment of chemicals: A central European perspective

    International Nuclear Information System (INIS)

    Bencko, Vladimir; Gyoergy Ungvary

    1992-01-01

    Toxicometric Methodology held in Moscow in November 1985 and IPCS organized a Technical Review Meeting to compare CMEA and OECD Approaches to Toxicity Testing and Risk Assessment in Geneva, May 1987. A part of this effort was the publication of a Collection of Training Materials in Preventive Toxicology in the USSR within the UNEP/IRPTC project, Control of Hazards Posed by Chemicals to Human Health and the Environment (UNEP/IRPTC 1984)

  11. Toward an objective assessment of technical skills: a national survey of surgical program directors in Saudi Arabia.

    Science.gov (United States)

    Alkhayal, Abdullah; Aldhukair, Shahla; Alselaim, Nahar; Aldekhayel, Salah; Alhabdan, Sultan; Altaweel, Waleed; Magzoub, Mohi Elden; Zamakhshary, Mohammed

    2012-01-01

    After almost a decade of implementing competency-based programs in postgraduate training programs, the assessment of technical skills remains more subjective than objective. National data on the assessment of technical skills during surgical training are lacking. We conducted this study to document the assessment tools for technical skills currently used in different surgical specialties, their relationship with remediation, the recommended tools from the program directors' perspective, and program directors' attitudes toward the available objective tools to assess technical skills. This study was a cross-sectional survey of surgical program directors (PDs). The survey was initially developed using a focus group and was then sent to 116 PDs. The survey contains demographic information about the program, the objective assessment tools used, and the reason for not using assessment tools. The last section discusses the recommended tools to be used from the PDs' perspective and the PDs' attitude and motivation to apply these tools in each program. The associations between the responses to the assessment questions and remediation were statistically evaluated. Seventy-one (61%) participants responded. Of the respondents, 59% mentioned using only nonstandardized, subjective, direct observation for technical skills assessment. Sixty percent use only summative evaluation, whereas 15% perform only formative evaluations of their residents, and the remaining 22% conduct both summative and formative evaluations of their residents' technical skills. Operative portfolios are kept by 53% of programs. The percentage of programs with mechanisms for remediation is 29% (19 of 65). The survey showed that surgical training programs use different tools to assess surgical skills competency. Having a clear remediation mechanism was highly associated with reporting remediation, which reflects the capability to detect struggling residents. Surgical training leadership should invest more in

  12. Reduce the risk of stock trading by using technical analysis in iran's ...

    African Journals Online (AJOL)

    Reduce the risk of stock trading by using technical analysis in iran's stock market. ... In this research, efficiency of 50 active companies of Tehran Stock ... With this observation, this research suggest forming a portfolio with zero cost by purchasing ... FAQ's · More about AJOL · AJOL's Partners · Terms and Conditions of Use ...

  13. Pedagogical characteristics of the systems for assessing the technical and tactical skills of qualified volleyball players

    Directory of Open Access Journals (Sweden)

    Мykhailo Oliinyk

    2017-12-01

    Full Text Available Purpose: on the basis of the analysis of the special literature and their own experimental studies, to determine the characteristics of the systems for assessing the technical and tactical skills of qualified volleyball players. Material & Methods: study was conducted on the basis of the material of the national team of Zaporozhye State Medical University on volleyball. Analysis and generalization of the data of scientific and methodical literature are used; registration, analysis and interpretation of indicators of technical and tactical actions of qualified volleyball players in training and competitive processes; pedagogical observations; algorithms for calculating the quantitative and qualitative indicators of technical and tactical skill in volleyball; methods of mathematical statistics. Results: data on the existence of a strong statistical relationship between the systems of assessment of technical and tactical skills of qualified volleyball players, taking into account the specificity of the game role. Conclusion: shows the specifics of the application of various systems for assessing the technical and tactical skills of qualified volleyball players, taking into account the factors of the game role, noted the methodological features of special analysis and interpretation of indicators of technical and tactical actions in the adversarial process.

  14. Risk Assessment During the Final Phase of an Uncontrolled Re-Entry

    Science.gov (United States)

    Gaudel, A.; Hourtolle, C.; Goester, J. F.; Fuentes, N.

    2013-09-01

    As French National Space Agency, CNES is empowered to monitor compliance with technical regulations of the French Space Operation Act, FSOA, and to take all necessary measures to ensure the safety of people, property, public health and environment for all space operations involving French responsibility at international level.Therefore, CNES developed ELECTRA that calculates the risk for ground population involved in three types of events: rocket launching, controlled re-entry and uncontrolled re-entry. For the first two cases, ELECTRA takes into account degraded cases due to a premature stop of propulsion.Major evolutions were implemented recently on ELECTRA to meet new users' requirements, like the risk assessment during the final phase of uncontrolled re-entry, that can be combined with the computed risk for each country involved by impacts.The purpose of this paper is to provide an overview of the ELECTRA method and main functionalities, and then to highlight these recent improvements.

  15. Insights into location dependent loss-of-coolant-accident (LOCA) frequency assessment for GSI-191 risk-informed applications

    Energy Technology Data Exchange (ETDEWEB)

    Fleming, K.N., E-mail: KarlFleming@comcast.net [KNF Consulting LLC, Spokane, WA (United States); Lydell, B.O.Y. [SIGMA-PHASE INC., Vail, AZ (United States)

    2016-08-15

    Highlights: • Role of operating experience in loss-of-coolant-accident (LOCA) frequency assessment. • Plant-to-plant variability in calculated LOCA frequency. • Frequency of double-ended-guillotine-break (DEGB). • Uncertainties in LOCA frequencies. • Risk management insights. - Abstract: As a tribute to the published work by S.H. Bush, S. Beliczey and H. Schulz, this paper assesses the progress with methods and techniques for quantifying the reliability of piping systems in commercial nuclear power plants on the basis of failure rate estimates derived from field experience data in combination with insights and results from probabilistic fracture mechanics analyses and expert elicitation exercises. This status assessment is made from a technical perspective obtained through development of location-specific loss-of-coolant-accident (LOCA) frequencies for input to risk-informed resolution of the generic safety issue (GSI) 191. The methods and techniques on which these GSI-191 applications are based build on a body of work developed by the authors during a period spanning more than two decades. The insights that are presented and discussed in this paper cover today’s knowledge base concerning how to utilize a risk-informed approach to the assessment of piping reliability in the context of probabilistic risk assessment (PRA) in general and the resolution of GSI-191 in particular. Specifically the paper addresses the extent to which LOCA frequencies vary from location to location within a reactor coolant system pressure boundary (RCPB) for a given plant as well as vary from plant to plant, and the reasons for these variabilities. Furthermore, the paper provides the authors’ perspectives on interpretations and applications of information extracted from an expert elicitation process to obtain LOCA frequencies as documented in NUREG-1829 and how to apply this information to GSI-191. Finally, this paper documents technical insights relative to mitigation of

  16. Insights into location dependent loss-of-coolant-accident (LOCA) frequency assessment for GSI-191 risk-informed applications

    International Nuclear Information System (INIS)

    Fleming, K.N.; Lydell, B.O.Y.

    2016-01-01

    Highlights: • Role of operating experience in loss-of-coolant-accident (LOCA) frequency assessment. • Plant-to-plant variability in calculated LOCA frequency. • Frequency of double-ended-guillotine-break (DEGB). • Uncertainties in LOCA frequencies. • Risk management insights. - Abstract: As a tribute to the published work by S.H. Bush, S. Beliczey and H. Schulz, this paper assesses the progress with methods and techniques for quantifying the reliability of piping systems in commercial nuclear power plants on the basis of failure rate estimates derived from field experience data in combination with insights and results from probabilistic fracture mechanics analyses and expert elicitation exercises. This status assessment is made from a technical perspective obtained through development of location-specific loss-of-coolant-accident (LOCA) frequencies for input to risk-informed resolution of the generic safety issue (GSI) 191. The methods and techniques on which these GSI-191 applications are based build on a body of work developed by the authors during a period spanning more than two decades. The insights that are presented and discussed in this paper cover today’s knowledge base concerning how to utilize a risk-informed approach to the assessment of piping reliability in the context of probabilistic risk assessment (PRA) in general and the resolution of GSI-191 in particular. Specifically the paper addresses the extent to which LOCA frequencies vary from location to location within a reactor coolant system pressure boundary (RCPB) for a given plant as well as vary from plant to plant, and the reasons for these variabilities. Furthermore, the paper provides the authors’ perspectives on interpretations and applications of information extracted from an expert elicitation process to obtain LOCA frequencies as documented in NUREG-1829 and how to apply this information to GSI-191. Finally, this paper documents technical insights relative to mitigation of

  17. Technical Assessment of Cryo-Compressed Hydrogen Storage Tank Systems for Automotive Applications

    Energy Technology Data Exchange (ETDEWEB)

    Ahluwalia, Rajesh [Argonne National Lab. (ANL), Argonne, IL (United States); Hua, T. Q. [Argonne National Lab. (ANL), Argonne, IL (United States); Peng, J. -K. [Argonne National Lab. (ANL), Argonne, IL (United States); Lasher, S. [TIAX LLC, Lexington, MA (United States); McKenney, Kurtis [TIAX LLC, Lexington, MA (United States); Sinha, J. [TIAX LLC, Lexington, MA (United States)

    2009-12-01

    Technical report describing DOE's second assessment report on a third generation (Gen3) system capable of storing hydrogen at cryogenic temperatures within a pressure vessel on-board a vehicle. The report includes an overview of technical progress to date, including the potential to meet DOE onboard storage targets, as well as independent reviews of system cost and energy analyses of the technology paired with delivery costs.

  18. Toward feasible, valid, and reliable video-based assessments of technical surgical skills in the operating room

    DEFF Research Database (Denmark)

    Aggarwal, R.; Grantcharov, T.; Moorthy, K.

    2008-01-01

    .72). Conclusions: Video-based technical skills evaluation in the operating room is feasible, valid and reliable. Global rating scales hold promise for summative assessment, though further work is necessary to elucidate the value of procedural rating scales Udgivelsesdato: 2008/2......Objective: To determine the feasibility, validity, inter-rater, and intertest reliability of 4 previously published video-based rating scales, for technical skills assessment on a benchmark laparoscopic procedure. Summary Background Data: Assessment of technical skills is crucial...... to the demonstration and maintenance of competent healthcare practitioners. Traditional assessment methods are prone to subjectivity through a lack of proven validity and reliability. Methods: Nineteen surgeons (6 novice and 13 experienced) performed a median of 2 laparoscopic cholecystectomies each (range 1-5) on 53...

  19. Assessing Your Weight and Health Risk

    Science.gov (United States)

    ... Health Professional Resources Assessing Your Weight and Health Risk Assessment of weight and health risk involves using ... risk for developing obesity-associated diseases or conditions. Risk Factors for Health Topics Associated With Obesity Along ...

  20. Integrated risk - healthy technical conscience

    Energy Technology Data Exchange (ETDEWEB)

    Freeman, P. [Institute of Nuclear Power Operations, Atlanta, GA (United States)

    2015-07-01

    The personal obligation leaders and individuals internalize and exercise to ensure plant operation, maintenance, and engineering activities are conducted in a manner consistent with plant design, emergency response strategies, technical requirements and that preserve operating, design and safety margins. Technical errors are increasing, both in number and significance. Causes are common at many utilities. The majority of these engineering human performance weaknesses have not had immediate impact on station reliability and safety (not self-revealing). In some recent projects, the same weaknesses affected a station's viability.

  1. Methodology for quantitative assessment of technical condition in industrial systems

    Energy Technology Data Exchange (ETDEWEB)

    Steinbach, C [Marintek AS (Norway); Soerli, A [Statoil (Norway)

    1999-12-31

    As part of the Eureka project Ageing Management a methodology has been developed to assess the technical condition of industrial systems. The first part of the presentation argues for the use of technical condition parameters in the context of maintenance strategies. Thereafter the term `technical condition` is defined more thoroughly as it is used within the project. It is claimed that the technical condition of a system - such as a feed water system of a nuclear power plant, or a water injection system on an oil platform - may be determined by aggregating the condition of its smaller components using a hierarchic approach. The hierarchy has to be defined in co-operation with experienced personnel and reflects the impact of degradation of elements on a lower level to nodes higher in the hierarchy. The impact is divided into five categories with respect to safety, environment, availability, costs and man-hours. To determine the technical condition of the bottom elements of the hierarchy, available data is used from both an on-line condition monitoring system and maintenance history. The second part of the presentation introduces the prototype software tool TeCoMan which utilises the theory and applies it to installations of the participating companies. First results and gained experiences with the method and tool are discussed. (orig.)

  2. Methodology for quantitative assessment of technical condition in industrial systems

    Energy Technology Data Exchange (ETDEWEB)

    Steinbach, C. [Marintek AS (Norway); Soerli, A. [Statoil (Norway)

    1998-12-31

    As part of the Eureka project Ageing Management a methodology has been developed to assess the technical condition of industrial systems. The first part of the presentation argues for the use of technical condition parameters in the context of maintenance strategies. Thereafter the term `technical condition` is defined more thoroughly as it is used within the project. It is claimed that the technical condition of a system - such as a feed water system of a nuclear power plant, or a water injection system on an oil platform - may be determined by aggregating the condition of its smaller components using a hierarchic approach. The hierarchy has to be defined in co-operation with experienced personnel and reflects the impact of degradation of elements on a lower level to nodes higher in the hierarchy. The impact is divided into five categories with respect to safety, environment, availability, costs and man-hours. To determine the technical condition of the bottom elements of the hierarchy, available data is used from both an on-line condition monitoring system and maintenance history. The second part of the presentation introduces the prototype software tool TeCoMan which utilises the theory and applies it to installations of the participating companies. First results and gained experiences with the method and tool are discussed. (orig.)

  3. Risk assessment theory, methods, and applications

    CERN Document Server

    Rausand, Marvin

    2011-01-01

    With its balanced coverage of theory and applications along with standards and regulations, Risk Assessment: Theory, Methods, and Applications serves as a comprehensive introduction to the topic. The book serves as a practical guide to current risk analysis and risk assessment, emphasizing the possibility of sudden, major accidents across various areas of practice from machinery and manufacturing processes to nuclear power plants and transportation systems. The author applies a uniform framework to the discussion of each method, setting forth clear objectives and descriptions, while also shedding light on applications, essential resources, and advantages and disadvantages. Following an introduction that provides an overview of risk assessment, the book is organized into two sections that outline key theory, methods, and applications. * Introduction to Risk Assessment defines key concepts and details the steps of a thorough risk assessment along with the necessary quantitative risk measures. Chapters outline...

  4. The issue of risk dilution in risk assessments

    International Nuclear Information System (INIS)

    Wilmot, R.; Robinson, P.

    2004-01-01

    This paper explores an issue that was first highlighted more than 20 years ago during an inquiry concerning the Sizeweli B nuclear power station in the UK. In the probabilistic safety assessment for this plant, the proponent had apparently reduced its estimates of risk by admitting to increased uncertainty about the timing of certain events. This situation is counter-intuitive, since an increase in uncertainty about the factors contributing to safety would be expected to lead to less confidence and hence to greater risk. This paradoxical situation was termed 'risk dilution' and it has been a topic of interest to reviewers of safety cases since. The recent international peer review of the Yucca Mountain performance assessments concluded that there was a potential for risk dilution in the assumptions and calculations presented. The next section describes how assumptions about the timing of events and other aspects of an assessment may lead to risk dilution, and this is followed by two examples based on recent performance assessments. The final section discusses how potential problems can be identified in safety cases, and the types of response that a regulator might adopt as a result. (authors)

  5. Technical Assessments of Future European Space Transportation Options

    OpenAIRE

    Sippel, Martin; van Foreest, Arnold; Dutheil, Jean-Philippe; Philip, Peter

    2007-01-01

    The paper describes some of the most recent activities in Germany in the technical assessment of future European launcher architecture. In focus is a joint effort of DLR-SART with German launcher industry in the definition of a next generation upper-medium class expendable TSTO with an initial operational capability after 2020. Involved companies are EADS astrium and MT Aerospace. This DLR-agency funded study WOTAN investigates fully cryogenic launchers as well as those with a com...

  6. L-Band Digital Aeronautical Communications System Engineering - Initial Safety and Security Risk Assessment and Mitigation

    Science.gov (United States)

    Zelkin, Natalie; Henriksen, Stephen

    2011-01-01

    This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed L-band (960 to 1164 MHz) terrestrial en route communications system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents a preliminary safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the L-band communication system after the technology is chosen and system rollout timing is determined. The security risk analysis resulted in identifying main security threats to the proposed system as well as noting additional threats recommended for a future security analysis conducted at a later stage in the system development process. The document discusses various security controls, including those suggested in the COCR Version 2.0.

  7. Risk-assessment methodology development for waste isolation in geologic media

    International Nuclear Information System (INIS)

    Stevens, C.A.; Fullwood, R.R.; Amirijafari, B.; Basin, S.L.; Cohen, J.

    1982-12-01

    A review of three documents prepared for the USNRC by Sandia National Laboratories (SNL) is presented. These are NUREG/CR-1634, Volume 4 concerned with the effects of variable hydrology on waste migration; NUREG/CR-2324, a user's manual for SWIFT; and NUREG/2343, a user's manual for DNET. This review completes Task 4 of the detailed technical review of the SNL program for Risk Assessment Methodology Development for Waste Isolation in Geologic Media. In general, these reports exhibit high technical quality that characterizes the SNL work. They are tersely written with little condescension to the non-expert reader for understanding the physical situation being modeled. Indeed, the emphasis is on the mathematical procedures rather than the repository physics, leaving the adequacy of the results presented in many computer plots, pretty much to the interpretation of the reader. Other general comments have been presented previously, such as the data conservatisms, need for data that cannot be measured without disturbing the geometry, and the overall plan for use of the many codes developed in the program

  8. Risk Assessment in the Maritime Industry

    Directory of Open Access Journals (Sweden)

    M. Mousavi

    2017-02-01

    Full Text Available Risk assessment is a well-developed field which many operators are currently applying to improve their operations and reduce their risk exposure. This paper is intended to provide an overview of the risk assessment for mariners in the Maritime transportation. The risks addressed are primarily those affecting the safety of a vessel, facility or operation. The concept of risk is defined, and the methods available to assess the risks associated with an operation are described. Regulatory requirements that have prompted the development of modern risk assessment practices are described, and future regulatory trends are discussed. There are many different analysis techniques and models that have been developed to aid in conducting risk assessments. A key to any successful risk analysis is choosing the right method (or combination of methods for the situation at hand. This is achieved through critical analysis of the available data concerning marine crises. This paper provides a brief introduction to some of the analysis methods available and suggests risk analysis approaches to support different types of decision making within the maritime transportation to cope with crises. Finally, as awareness of risk assessment increases, the benefits which can be realized through its application will continue to increase. Organizations in both the public and the private sector are becoming more and more familiar with the benefits associated with risk-based approaches to managing safety and consequently reducing crisis in maritime transportation.

  9. The MARINA Risk Assessment Strategy: A Flexible Strategy for Efficient Information Collection and Risk Assessment of Nanomaterials.

    Science.gov (United States)

    Bos, Peter M J; Gottardo, Stefania; Scott-Fordsmand, Janeck J; van Tongeren, Martie; Semenzin, Elena; Fernandes, Teresa F; Hristozov, Danail; Hund-Rinke, Kerstin; Hunt, Neil; Irfan, Muhammad-Adeel; Landsiedel, Robert; Peijnenburg, Willie J G M; Sánchez Jiménez, Araceli; van Kesteren, Petra C E; Oomen, Agnes G

    2015-11-27

    An engineered nanomaterial (ENM) may actually consist of a population of primary particles, aggregates and agglomerates of various sizes. Furthermore, their physico-chemical characteristics may change during the various life-cycle stages. It will probably not be feasible to test all varieties of all ENMs for possible health and environmental risks. There is therefore a need to further develop the approaches for risk assessment of ENMs. Within the EU FP7 project Managing Risks of Nanoparticles (MARINA) a two-phase risk assessment strategy has been developed. In Phase 1 (Problem framing) a base set of information is considered, relevant exposure scenarios (RESs) are identified and the scope for Phase 2 (Risk assessment) is established. The relevance of an RES is indicated by information on exposure, fate/kinetics and/or hazard; these three domains are included as separate pillars that contain specific tools. Phase 2 consists of an iterative process of risk characterization, identification of data needs and integrated collection and evaluation of data on the three domains, until sufficient information is obtained to conclude on possible risks in a RES. Only data are generated that are considered to be needed for the purpose of risk assessment. A fourth pillar, risk characterization, is defined and it contains risk assessment tools. This strategy describes a flexible and efficient approach for data collection and risk assessment which is essential to ensure safety of ENMs. Further developments are needed to provide guidance and make the MARINA Risk Assessment Strategy operational. Case studies will be needed to refine the strategy.

  10. The MARINA Risk Assessment Strategy: A Flexible Strategy for Efficient Information Collection and Risk Assessment of Nanomaterials

    Directory of Open Access Journals (Sweden)

    Peter M. J. Bos

    2015-11-01

    Full Text Available An engineered nanomaterial (ENM may actually consist of a population of primary particles, aggregates and agglomerates of various sizes. Furthermore, their physico-chemical characteristics may change during the various life-cycle stages. It will probably not be feasible to test all varieties of all ENMs for possible health and environmental risks. There is therefore a need to further develop the approaches for risk assessment of ENMs. Within the EU FP7 project Managing Risks of Nanoparticles (MARINA a two-phase risk assessment strategy has been developed. In Phase 1 (Problem framing a base set of information is considered, relevant exposure scenarios (RESs are identified and the scope for Phase 2 (Risk assessment is established. The relevance of an RES is indicated by information on exposure, fate/kinetics and/or hazard; these three domains are included as separate pillars that contain specific tools. Phase 2 consists of an iterative process of risk characterization, identification of data needs and integrated collection and evaluation of data on the three domains, until sufficient information is obtained to conclude on possible risks in a RES. Only data are generated that are considered to be needed for the purpose of risk assessment. A fourth pillar, risk characterization, is defined and it contains risk assessment tools. This strategy describes a flexible and efficient approach for data collection and risk assessment which is essential to ensure safety of ENMs. Further developments are needed to provide guidance and make the MARINA Risk Assessment Strategy operational. Case studies will be needed to refine the strategy.

  11. Business risks, functions, methods of assessment and ways to reduce risk

    Directory of Open Access Journals (Sweden)

    A.V. Mihalchuk

    2015-06-01

    Full Text Available For successful existence in a market economy entrepreneur have to take bold actions, and this increases the risk. The article describes the concept of entrepreneurship and business risk, positive and negative aspects of functions of risk in business. Therefore, it is necessary to assess the risk properly and be able to manage it to achieve the most effective results in the market. In market conditions the problem of assessing and accounting market becomes independent theoretical and practical significance as an important component of the theory and practice of management. Risk - a key element of business activities. Development of risk situations can lead to both the occurrence of adverse effects (losses, lost profits, and positive results for a company in the form of increased profit. This article describes: the concept of entrepreneurship, risk and business risks, characteristic of positive and negative aspects of risk functions in business, methods of assessment and risk reduction, shows formulae and examples you can use to assess risk in an enterprise. Analyzing already established methods of risk assessment a number of rules were proposed in order to reduce business risk.

  12. Risk Assessment

    OpenAIRE

    Hrdová, Edita

    2012-01-01

    This diploma thesis is focused on companies risk evaluation before endorsement of Loan deriving from business relationships. The aim of this thesis is not only to describe individual steps of risk assessment, but also perfom analysis of particular companies based on available data, i.e. Balance sheet, Profit and Loss statement and external rating and after that propose solution for each company. My analysis will be based on theoretical knowledge, further on experience related to my job role a...

  13. HTGR accident and risk assessment

    International Nuclear Information System (INIS)

    Silady, F.A.; Everline, C.J.; Houghton, W.J.

    1982-01-01

    This paper is a synopsis of the high-temperature gas-cooled reactor probabilistic risk assessments (PRAs) performed by General Atomic Company. Principal topics presented include: HTGR safety assessments, peer interfaces, safety research, process gas explosions, quantitative safety goals, licensing applications of PRA, enhanced safety, investment risk assessments, and PRA design integration

  14. Exploring the use of internal and externalcontrols for assessing microarray technical performance

    Directory of Open Access Journals (Sweden)

    Game Laurence

    2010-12-01

    Full Text Available Abstract Background The maturing of gene expression microarray technology and interest in the use of microarray-based applications for clinical and diagnostic applications calls for quantitative measures of quality. This manuscript presents a retrospective study characterizing several approaches to assess technical performance of microarray data measured on the Affymetrix GeneChip platform, including whole-array metrics and information from a standard mixture of external spike-in and endogenous internal controls. Spike-in controls were found to carry the same information about technical performance as whole-array metrics and endogenous "housekeeping" genes. These results support the use of spike-in controls as general tools for performance assessment across time, experimenters and array batches, suggesting that they have potential for comparison of microarray data generated across species using different technologies. Results A layered PCA modeling methodology that uses data from a number of classes of controls (spike-in hybridization, spike-in polyA+, internal RNA degradation, endogenous or "housekeeping genes" was used for the assessment of microarray data quality. The controls provide information on multiple stages of the experimental protocol (e.g., hybridization, RNA amplification. External spike-in, hybridization and RNA labeling controls provide information related to both assay and hybridization performance whereas internal endogenous controls provide quality information on the biological sample. We find that the variance of the data generated from the external and internal controls carries critical information about technical performance; the PCA dissection of this variance is consistent with whole-array quality assessment based on a number of quality assurance/quality control (QA/QC metrics. Conclusions These results provide support for the use of both external and internal RNA control data to assess the technical quality of microarray

  15. Anthropic Risk Assessment on Biodiversity

    Science.gov (United States)

    Piragnolo, M.; Pirotti, F.; Vettore, A.; Salogni, G.

    2013-01-01

    This paper presents a methodology for risk assessment of anthropic activities on habitats and species. The method has been developed for Veneto Region, in order to simplify and improve the quality of EIA procedure (VINCA). Habitats and species, animals and plants, are protected by European Directive 92/43/EEC and 2009/147/EC but they are subject at hazard due to pollution produced by human activities. Biodiversity risks may conduct to deterioration and disturbance in ecological niches, with consequence of loss of biodiversity. Ecological risk assessment applied on Natura 2000 network, is needed to best practice of management and monitoring of environment and natural resources. Threats, pressure and activities, stress and indicators may be managed by geodatabase and analysed using GIS technology. The method used is the classic risk assessment in ecological context, and it defines the natural hazard as influence, element of risk as interference and vulnerability. Also it defines a new parameter called pressure. It uses risk matrix for the risk analysis on spatial and temporal scale. The methodology is qualitative and applies the precautionary principle in environmental assessment. The final product is a matrix which excludes the risk and could find application in the development of a territorial information system.

  16. Risk assessment and the environment

    International Nuclear Information System (INIS)

    Fisk, D.J.

    1992-01-01

    This paper reviews the use of risk assessment techniques in the field of environment protection. I will argue that in some important instances the development of environment policy has been a source of fruitful development of a risk based methodologies. In other cases the importation of risk assessment techniques has proved much more problematic. As the scope of environmental regulation increases so does the possibility of inconsistent and arbitrary solutions to problems. The need for a more systematic approach to the development of environmental regulation has never been stronger, so it is important to understand the reasons for the mixed success of risk assessment. This applies equally to those nations with long traditions of the regulation of private sector industry and those just beginning on this course. The way ahead may be to extend our ideas of how to express risk and uncertainty. Some of the recent cause celebres of environment policy show this challenge very clearly. As an example, this paper will look at the problem of assessing the risk of man-made climate change

  17. Risk assessment and the environment

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, D J [Department of the Environment (United Kingdom)

    1992-07-01

    This paper reviews the use of risk assessment techniques in the field of environment protection. I will argue that in some important instances the development of environment policy has been a source of fruitful development of a risk based methodologies. In other cases the importation of risk assessment techniques has proved much more problematic. As the scope of environmental regulation increases so does the possibility of inconsistent and arbitrary solutions to problems. The need for a more systematic approach to the development of environmental regulation has never been stronger, so it is important to understand the reasons for the mixed success of risk assessment. This applies equally to those nations with long traditions of the regulation of private sector industry and those just beginning on this course. The way ahead may be to extend our ideas of how to express risk and uncertainty. Some of the recent cause celebres of environment policy show this challenge very clearly. As an example, this paper will look at the problem of assessing the risk of man-made climate change.

  18. Assuring PSA technical adequacy for new advanced light water reactor designs

    International Nuclear Information System (INIS)

    Lutz, R.J.; Detar, H.L.; Schneider, R.E.

    2012-01-01

    The Probabilistic Safety Assessment (PSA) for an Advanced Light Water Reactor (ALWR) must exhibit a high level of technical adequacy, or technical quality, in order to be used as a reliable tool for making risk informed decisions concerning design and eventual operation of the plant. During the design phase, decisions on some design features may use the PSA as an input. Also, the PSA may be used as input to other operational decisions during plant design and construction including the development of procedures, development of technical specification limiting conditions for operation and scheduling of preventive maintenance activities. For the existing fleet of light water reactors (LWRs), PSA technical adequacy can be judged from wide ranging acceptance criteria such as the PRA (Probabilistic Risk Assessment) Standard in the United States of America that was developed jointly by the American Society of Mechanical Engineers (ASME) and the American Nuclear Society (ANS). However, the requirements for PRA technical adequacy in this PRA Standard assumes that the plant is built and has operation experience. Some of the requirements cannot be met for ALWRs in the design or construction phase and with no operational history. Key elements of a high level of technical adequacy include procedures, operator interviews, plant walk-downs and equipment reliability histories. The ability to include these key elements into the ALWR PSA to improve technical adequacy will progress as the ALWR progresses from the design stage through the construction stage and finally to the fuel load / pre-operational stage. As the technical adequacy becomes more robust, more confidence can be placed on risk-informed decisions that are made with the PSA. To assist in using the PSA as input to design and operational decisions in the design and construction stages of an ALWR, an addition to the ASME/ANS PRA Standard is being developed. The intent of this addition to the Standard is to provide

  19. Probabilistic risk analysis in chemical engineering

    International Nuclear Information System (INIS)

    Schmalz, F.

    1991-01-01

    In risk analysis in the chemical industry, recognising potential risks is considered more important than assessing their quantitative extent. Even in assessing risks, emphasis is not on the probability involved but on the possible extent. Qualitative assessment has proved valuable here. Probabilistic methods are used in individual cases where the wide implications make it essential to be able to assess the reliability of safety precautions. In this case, assessment therefore centres on the reliability of technical systems and not on the extent of a chemical risk. 7 figs

  20. A simple framework for assessing technical skills in a resident observed structured clinical examination (OSCE): vaginal laceration repair.

    Science.gov (United States)

    Winkel, Abigail Ford; Lerner, Veronica; Zabar, Sondra R; Szyld, Demian

    2013-01-01

    Educators of trainees in procedure-based specialties need focused assessment tools that are valid, objective, and assess technical skills in a realistic context. A framework for hybrid assessment using standardized patient scenarios and bench skills testing might facilitate evaluation of competency. Seven PGY-1 obstetrics and gynecology residents participated in a hybrid assessment that used observed structured clinical examination (OSCE) by a standardized patient who had sustained a vaginal laceration during vaginal delivery. The residents elicited a history and counseled the patient, and then completed a laceration repair on a pelvic model. The residents were rated on their performance in the scenario, which included issues of cultural competency, rapport-building, patient counseling. The technical skills were videotaped and rated using a modified global assessment form by 2 faculty members on a 3-point scale from "not done" to "partly done" to "well-done." Residents also completed a subjective assessment of the station. Mean technical performance of the residents on the technical skills was 55% "well-done," with a range of 20%-90%. The assessment identified 3 residents as below the mean, and 1 resident with areas of deficiency. Subjective assessment by the residents was that juggling the technical, cognitive, and affective components of the examination was challenging. Technical skills can be included in a case-based assessment using scenarios that address a range of cognitive and affective skills required of physicians. Results may help training programs assess individuals' abilities as well as identify program needs for curricular improvement. This framework might be useful in setting standards for competency and identifying poor performers. Copyright © 2012 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  1. Risk assessment for halogenated solvents

    International Nuclear Information System (INIS)

    Travis, C.C.

    1988-01-01

    A recent development in the cancer risk area is the advent of biologically based pharmacokinetic and pharmacodynamic models. These models allow for the incorporation of biological and mechanistic data into the risk assessment process. These advances will not only improve the risk assessment process for halogenated solvents but will stimulate and guide basic research in the biological area

  2. RESIDUAL RISK ASSESSMENT: ETHYLENE OXIDE ...

    Science.gov (United States)

    This document describes the residual risk assessment for the Ethylene Oxide Commercial Sterilization source category. For stationary sources, section 112 (f) of the Clean Air Act requires EPA to assess risks to human health and the environment following implementation of technology-based control standards. If these technology-based control standards do not provide an ample margin of safety, then EPA is required to promulgate addtional standards. This document describes the methodology and results of the residual risk assessment performed for the Ethylene Oxide Commercial Sterilization source category. The results of this analyiss will assist EPA in determining whether a residual risk rule for this source category is appropriate.

  3. Tropical Airborne LiDAR for Landslide Assessment in Malaysia: a technical perspective

    Science.gov (United States)

    Abd Manap, Mohamad; Azhari Razak, Khamarrul; Mohamad, Zakaria; Ahmad, Azhari; Ahmad, Ferdaus; Mohamad Zin, Mazlan; A'zad Rosle, Qalam

    2015-04-01

    results of the study produced 4 point/m2 density of LiDAR data point cloud, very detailed DEM and DSM of 0.5 m grid and high resolution digital aerial photograph of 7 cm grid, as well as an inventory of the landslide. A reliable landslide inventory has been critically developed with the input of LIDAR derivatives data and field investigation emphasizing on its crucial attributes, e.g., the landslide types, depth, style-, states and distribution of landslide activity. As a result of this study, guidelines and recommendation on the technical aspect of LIDAR-derived landslide assessment are explicitly presented and critically discussed. The finding of this project will be very useful for future planning of slope management, sustainable land use planning and development by related government agencies and local authorities in Malaysia. Keywords: Airborne LiDAR; landslide assessment; hazard and risk analysis; 3D point cloud density; slope failures; Malaysia

  4. Risk assessment: An employer's perspective

    International Nuclear Information System (INIS)

    Williams, K.C.

    1992-01-01

    There is no question that a careful assessment of risk is essential for safe industrial operations. For that reason, a thoughtful analysis of the effectiveness of available risk assessment technologies is prerequisite for responsible corporate decision making. An 'employer's' perspective on risk assessment cannot be constrained by any artificial restrictions which that term may imply. In reality, all those who are involved in the execution of an industrial enterprise: managers, regulators, the affected public, and especially those employees exposed to hazards, are necessarily partners in assessment of risk. The perspective of this paper is that of the oil and gas industry, in which the author's organization, Exxon Company, International, participates. The paper addresses what Exxon requires to assess and manage risk in its worldwide operations. The author is aware, however, through contacts with industry colleagues, that some of Exxon's initiatives are representative of similar actions being taken by others. 1992 is the European Year of Safety, Health and Hygiene, coinciding with the United Kingdom's Presidency of the European Council. It is also the year in which new 'goal-setting' regulations covering safety in the U.K. offshore oil industry were put forward by the Health and Safety Commission. These regulations, based largely on Lord Cullen's recommendations following the Piper Alpha tragedy, set the pace for safety in the British North Sea and will significantly impact the safety of offshore oil installations worldwide. The requirement for risk assessment, using a systematic process of analysing and evaluating risk, is a key component of this safety regime

  5. Risk assessment: An employer's perspective

    Energy Technology Data Exchange (ETDEWEB)

    Williams, K C [Exxon International (United States)

    1992-07-01

    There is no question that a careful assessment of risk is essential for safe industrial operations. For that reason, a thoughtful analysis of the effectiveness of available risk assessment technologies is prerequisite for responsible corporate decision making. An 'employer's' perspective on risk assessment cannot be constrained by any artificial restrictions which that term may imply. In reality, all those who are involved in the execution of an industrial enterprise: managers, regulators, the affected public, and especially those employees exposed to hazards, are necessarily partners in assessment of risk. The perspective of this paper is that of the oil and gas industry, in which the author's organization, Exxon Company, International, participates. The paper addresses what Exxon requires to assess and manage risk in its worldwide operations. The author is aware, however, through contacts with industry colleagues, that some of Exxon's initiatives are representative of similar actions being taken by others. 1992 is the European Year of Safety, Health and Hygiene, coinciding with the United Kingdom's Presidency of the European Council. It is also the year in which new 'goal-setting' regulations covering safety in the U.K. offshore oil industry were put forward by the Health and Safety Commission. These regulations, based largely on Lord Cullen's recommendations following the Piper Alpha tragedy, set the pace for safety in the British North Sea and will significantly impact the safety of offshore oil installations worldwide. The requirement for risk assessment, using a systematic process of analysing and evaluating risk, is a key component of this safety regime.

  6. Key outcomes from risk based assessment of pressure equipment in refineries

    International Nuclear Information System (INIS)

    Firth, D.; Lichti, K.; Hill, T.; Thomas, C.; Widrig, J.; Simmonds, G.; Karstensen, A.

    2012-01-01

    Risk based assessment (RBA) has become the best industry practice for management of pressure equipment reliability. Application of RBA programs significantly reduces risk and gives opportunity to optimize inspection programs and produce long term financial benefits. Quest Integrity Group have implemented risk based inspection programs n a variety of industries including ammonia, methanol, geothermal power, :combined cycle power, gas turbines, gas production facilities and refineries. This paper outlines the semi quantitative RBA procedures that have been followed and lists some of the specific technical outcomes. Advanced inspection and life assessment methods used in support of RBI in refineries ire discussed. Piping in refineries is a key risk issue and it is not uncommon for piping failures to result in major incidents. Specific inspection programs are available to monitor differing damage processes such as flow assisted corrosion, hydrogen damage and corrosion under insulation. During assessment it s often found that numerous pipes have never been inspected especially underground smaller diameter pipes which are frequently considered to be un-piggable using conventional technologies and difficult to inspect. Advanced high accuracy flexible miniaturized ultrasonic intelligent pigging combined with fitness for service assessment such as Invista TM is recommended for inspection of critical pipelines which previously have been un-piggable. The processing of crude oil from a range of sources can result in significant variations in the levels of contaminants such as chlorides and sulfides. Major failures have occurred as a result of very rapid increases in corrosion rates in hydrotreating processes due to rapid changes in chemistry. The outcome of the assessment of plants that have potentially high and variable levels of contaminants often results in a review the process chemistry, how it is monitored and development of a detailed corrosion monitoring program. Fired

  7. Customization of a tool to assess Danish surgeons´ non-technical skills in the operating room

    DEFF Research Database (Denmark)

    Spanager, Lene; Lyk-Jensen, Helle Teglgaard; Dieckmann, Peter

    2012-01-01

    Errors in surgery often stem from failure related to non-technical skills such as communication and teamwork. Tools for training and assessment of non-technical skills are needed to ensure safe surgery. The aim of this study was to customize the Non-Technical Skills for Surgeons (NOTSS) rating...

  8. Perspectives and strategies of alternative methods used in the risk assessment of personal care products.

    Science.gov (United States)

    Quantin, P; Thélu, A; Catoire, S; Ficheux, H

    2015-11-01

    Risk assessment for personal care products requires the use of alternative methods since animal testing is now totally banned. Some of these methods are effective and have been validated by the "European Union Reference Laboratory for alternatives to animal testing"; but there is still a need for development and implementation of methods for specific endpoints. In this review, we have focused on dermal risk assessment because it is the prime route of absorption and main target organ for personal care products. Within this field, various areas must be assessed: irritation, sensitisation and toxicokinetic. Personal care product behaviour after use by the consumer and potential effects on the environment are also discussed. The purpose of this review is to show evolution and the prospects of alternative methods for safety dermal assessment. Assessment strategies must be adapted to the different chemical classes of substances studied but also to the way in which they are used. Finally, experimental and theoretical technical parameters that may impact on measured effects have been identified and discussed. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  9. Technical and economic assessment of process of treatment of coated bituminous sludge by combustion/vitrification (report PNGMDR 2013-2015)

    International Nuclear Information System (INIS)

    2015-01-01

    This note reports the assessment of a processing by combustion/vitrification of about 60.000 parcels of coated bituminous sludge belonging to intermediate-level long-lived and low-level long-lived category, and warehoused on the Marcoule CEA site. This assessment identifies the front-end cost of an exploratory R and D which would be required to undo technological locks, the cost of design, realisation and exploitation of the associated installation, and the negative features dues to the lack of technological maturity and to the management of environmental risks and impacts in comparison with the reference industrial solution (geological storage). As a conclusion, the authors state that the process is still not technically feasible

  10. RELEVANCE OF PROCESS RISK ASSESSMENT IN AIRLINES

    OpenAIRE

    Oksana G. Feoktistova; Igor K. Turkin; Sergey V. Barinov

    2017-01-01

    The notion of “the concept on assumed risk” that took over from the outdated concept of absolute security is analyzed, the increasing significance of operating risk assessment at the present stage is noted. Some basic risk assessment techniques are considered. Matrix technique of risk assessment is considered more thoroughly, and it may be used in risk assessment of airlines in the context of labour protection management system.The ability to correctly assess risks and develop appropriate pre...

  11. An abuse of risk assessment: how regulatory agencies improperly adopted LNT for cancer risk assessment.

    Science.gov (United States)

    Calabrese, Edward J

    2015-04-01

    The Genetics Panel of the National Academy of Sciences' Committee on Biological Effects of Atomic Radiation (BEAR) recommended the adoption of the linear dose-response model in 1956, abandoning the threshold dose-response for genetic risk assessments. This recommendation was quickly generalized to include somatic cells for cancer risk assessment and later was instrumental in the adoption of linearity for carcinogen risk assessment by the Environmental Protection Agency. The Genetics Panel failed to provide any scientific assessment to support this recommendation and refused to do so when later challenged by other leading scientists. Thus, the linearity model used in cancer risk assessment was based on ideology rather than science and originated with the recommendation of the NAS BEAR Committee Genetics Panel. Historical documentation in support of these conclusions is provided in the transcripts of the Panel meetings and in previously unexamined correspondence among Panel members.

  12. A framework for combining social impact assessment and risk assessment

    NARCIS (Netherlands)

    Mahmoudi, Hossein; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify

  13. A framework for combining social impact assessment and risk assessment

    NARCIS (Netherlands)

    Mahmoudi, Hossein; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    2013-01-01

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify

  14. Risk indices in comparative risk assessment studies

    International Nuclear Information System (INIS)

    Hubert, P.

    1984-01-01

    More than a decade ago the development of comparative risk assessment studies aroused overwhelming interest. There was no doubt that data on the health and safety aspects of energy systems would greatly benefit, or even end, the debate on nuclear energy. Although such attempts are still strongly supported, the rose-coloured expectations of the early days have faded. The high uncertainties, and the contradictory aspect, of the first results might explain this evolution. The loose connection between the range of computed risk indices and the questions on which the debate was focused is another reason for this decline in interest. Important research work is being carried out aiming at reducing the different kinds of uncertainties. Rather than the uncertainties, the paper considers the meaning of available risk indices and proposes more significant indices with respect to the goals of risk assessment. First, the indices which are of frequent use in comparative studies are listed. The stress is put on a French comparative study from which most examples are drawn. Secondly, the increase in magnitude of the indices and the decrease in the attributability of the risk to a given system is shown to be a consequence of the trend towards more comprehensive analyses. Thirdly, the ambiguity of such indices as the collective occupational risk is underlined, and a possible solution is suggested. Whenever risk assessments are related to pragmatic decision making problems it is possible to find satisfactory risk indices. The development of cost-effectiveness analyses and the proposals for quantitative safety goals clearly demonstrate this point. In the field of comparison of social impacts some proposals are made, but there remain some gaps still to be filled. (author)

  15. Risk investigation for safety assessment of nuclear power stations

    International Nuclear Information System (INIS)

    Heuser, F.W.; Hoertner, H.; Kersting, E.

    1987-01-01

    The most important results of the technical system investigations for Phase B of the German Risk Study and the insight gained from them are discussed in connection with the risk analyses in judging the safety-related design. The results of the German Precursor Study for the Biblis A and B plants are given. There is also a comparison of the German with more recent American risk analyses. (DG) [de

  16. Underground Economics for Vulnerability Risk

    NARCIS (Netherlands)

    Allodi, L.

    The estimation of vulnerability risk is at the core of any IT security management strategy. Among technical and infrastructural metrics of risk, attacker economics represent an emerging new aspect that several risk assessment methodologies propose to consider (e.g., based on game theory). Yet the

  17. Does radiation risk exist?

    International Nuclear Information System (INIS)

    Passchier, W.

    1996-01-01

    Risk assessment and risk management are parts of a dynamic process with the objective to decide on the tolerability of risk and on measures to keep risk within accepted limits. It enables all relevant parties to express their concerns and preferences regarding the different options for the human action involved and regarding the relative importance of criteria to decide on the tolerability of risk. Risk assessment has three phases; problem definition, risk analysis and risk characterization. Risk analysis is primarily a technical and scientific endeavour. With regard to problem definition and ride characterization consultation between risk assessors and risk managers (and other parties concerned) is a must. (author)

  18. Insights from Guideline for Performance of Internal Flooding Probabilistic Risk Assessment (IFPRA)

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Yang, Joo Eon

    2009-01-01

    An internal flooding (IF) risk assessment refers to the quantitative probabilistic safety assessment (PSA) treatment of flooding as a result of pipe and tank breaks inside the plants, as well as from other recognized flood sources. The industry consensus standard for Internal Events Probabilistic Risk Assessment (ASME-RA-Sb-2005) includes high-level and supporting technical requirements for developing internal flooding probabilistic risk assessment (IFPRA). This industry standard is endorsed in Regulatory Guide 1.200, Revision 1 as an acceptable approach for addressing the risk contribution from IF events for risk informed applications that require U.S. Nuclear Regulatory commission (NRC) approval. In 2006, EPRI published a draft report for IFPRA that addresses the requirements of the ASME PRA consensus standard and have made efforts to refine and update the final EPRI IFPRA guideline. Westinghouse has performed an IFPRA analysis for several nuclear power plants (NPPs), such as Watts Bar and Fort Calhoun, using the draft EPRI guidelines for development of an IFPRA. Proprietary methodologies have been developed to apply the EPRI guidelines. The objectives of the draft report for IFPRA guideline are to: · Provide guidance for PSA practitioners in the performance of the elements of a PRA associated with internal flooding events consistent with the current state of the art for internal flooding PRA · Provide guidance regarding acceptable approaches that is sufficient to meeting the requirements of the ASME PRA Standard associated with internal flooding · Incorporate lessons learned in the performance of internal flooding PRAs including those identified as pilot applications of earlier drafts of this procedures guide The purpose of this paper is to present a vision for domestic nuclear power plants' IFPRA by comparing the method of the draft EPRI guidelines with the existing IFPRA method for domestic NPPs

  19. Insights from Guideline for Performance of Internal Flooding Probabilistic Risk Assessment (IFPRA)

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Sun Yeong; Yang, Joo Eon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2009-10-15

    An internal flooding (IF) risk assessment refers to the quantitative probabilistic safety assessment (PSA) treatment of flooding as a result of pipe and tank breaks inside the plants, as well as from other recognized flood sources. The industry consensus standard for Internal Events Probabilistic Risk Assessment (ASME-RA-Sb-2005) includes high-level and supporting technical requirements for developing internal flooding probabilistic risk assessment (IFPRA). This industry standard is endorsed in Regulatory Guide 1.200, Revision 1 as an acceptable approach for addressing the risk contribution from IF events for risk informed applications that require U.S. Nuclear Regulatory commission (NRC) approval. In 2006, EPRI published a draft report for IFPRA that addresses the requirements of the ASME PRA consensus standard and have made efforts to refine and update the final EPRI IFPRA guideline. Westinghouse has performed an IFPRA analysis for several nuclear power plants (NPPs), such as Watts Bar and Fort Calhoun, using the draft EPRI guidelines for development of an IFPRA. Proprietary methodologies have been developed to apply the EPRI guidelines. The objectives of the draft report for IFPRA guideline are to: {center_dot} Provide guidance for PSA practitioners in the performance of the elements of a PRA associated with internal flooding events consistent with the current state of the art for internal flooding PRA {center_dot} Provide guidance regarding acceptable approaches that is sufficient to meeting the requirements of the ASME PRA Standard associated with internal flooding {center_dot} Incorporate lessons learned in the performance of internal flooding PRAs including those identified as pilot applications of earlier drafts of this procedures guide The purpose of this paper is to present a vision for domestic nuclear power plants' IFPRA by comparing the method of the draft EPRI guidelines with the existing IFPRA method for domestic NPPs.

  20. Permafrost Degradation Risk Zone Assessment using Simulation Models

    DEFF Research Database (Denmark)

    Daanen, R.P.; Ingeman-Nielsen, Thomas; Marchenko, S.

    2011-01-01

    In this proof-of-concept study we focus on linking large scale climate and permafrost simulations to small scale engineering projects by bridging the gap between climate and permafrost sciences on the one hand and on the other technical recommendation for adaptation of planned infrastructures...... to climate change in a region generally underlain by permafrost. We present the current and future state of permafrost in Greenland as modelled numerically with the GIPL model driven by HIRHAM climate projections up to 2080. We develop a concept called Permafrost Thaw Potential (PTP), defined...... as the potential active layer increase due to climate warming and surface alterations. PTP is then used in a simple risk assessment procedure useful for engineering applications. The modelling shows that climate warming will result in continuing wide-spread permafrost warming and degradation in Greenland...

  1. Validation of a novel duplex ultrasound objective structured assessment of technical skills (DUOSATS) for arterial stenosis detection.

    Science.gov (United States)

    Jaffer, U; Singh, P; Pandey, V A; Aslam, M; Standfield, N J

    2014-01-01

    Duplex ultrasound facilitates bedside diagnosis and hence timely patient care. Its uptake has been hampered by training and accreditation issues. We have developed an assessment tool for Duplex arterial stenosis measurement for both simulator and patient based training. A novel assessment tool: duplex ultrasound assessment of technical skills was developed. A modified duplex ultrasound assessment of technical skills was used for simulator training. Novice, intermediate experience and expert users of duplex ultrasound were invited to participate. Participants viewed an instructional video and were allowed ample time to familiarize with the equipment. Participants' attempts were recorded and independently assessed by four experts using the modified duplex ultrasound assessment of technical skills. 'Global' assessment was also done on a four point Likert scale. Content, construct and concurrent validity as well as reliability were evaluated. Content and construct validity as well as reliability were demonstrated. The simulator had good satisfaction rating from participants: median 4; range 3-5. Receiver operator characteristic analysis has established a cut point of 22/ 34 and 25/ 40 were most appropriate for simulator and patient based assessment respectively. We have validated a novel assessment tool for duplex arterial stenosis detection. Further work is underway to establish transference validity of simulator training to improved skill in scanning patients. We have developed and validated duplex ultrasound assessment of technical skills for simulator training.

  2. Development of the JNC geological disposal technical information integration system subjected for repository design and safety assessment

    International Nuclear Information System (INIS)

    Ishihara, Yoshinao; Ito, Takashi; Kobayashi, Shigeki; Neyama, Atsushi

    2004-02-01

    On this work, system manufacture about disposal technology and safety assessment field was performed towards construction of the JNC Geological Disposal Technical Information Integration System which systematized three fields of technical information acquired in investigation (site characteristic investigation) of geology environmental conditions, disposal technology (design of deep repository), and performance/safety assessment. The technical information database managed focusing on the technical information concerning individual research of an examination, analysis, etc. and the parameter set database managed focusing on the set up data set used in case of comprehensive evaluation are examined. In order to support and promote share and use of the technical information registered and managed by the database, utility functions, such as a technical information registration function, technical information search/browse function, analysis support function, and visualization function, are considered, and the system realized in these functions is built. The built system is installed in the server of JNC, and the functional check examination is carried out. (author)

  3. Chlorine transportation risk assessment

    International Nuclear Information System (INIS)

    Lautkaski, Risto; Mankamo, Tuomas.

    1977-02-01

    An assessment has been made on the toxication risk of the population due to the bulk rail transportation of liquid chlorine in Finland. Fourteen typical rail accidents were selected and their probability was estimated using the accident file of the Finnish State Railways. The probability of a chlorine leak was assessed for each type of accident separately using four leak size categories. The assessed leakage probability was dominated by station accidents, especially by collisions of a chlorine tanker and a locomotive. Toxication hazard areas were estimated for the leak categories. A simple model was constructed to describe the centring of the densely populated areas along the railway line. A comparison was made between the obtained risk and some other risks including those due to nuclear reactor accidents. (author)

  4. Probabilistic risk assessment, Volume I

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    This book contains 158 papers presented at the International Topical Meeting on Probabilistic Risk Assessment held by the American Nuclear Society (ANS) and the European Nuclear Society (ENS) in Port Chester, New York in 1981. The meeting was second in a series of three. The main focus of the meeting was on the safety of light water reactors. The papers discuss safety goals and risk assessment. Quantitative safety goals, risk assessment in non-nuclear technologies, and operational experience and data base are also covered. Included is an address by Dr. Chauncey Starr

  5. Risk assessment in maritime transportation

    International Nuclear Information System (INIS)

    Soares, C. Guedes; Teixeira, A.P.

    2001-01-01

    A review is presented of different approaches to quantify the risk in maritime transportation. The discussion of several accident statistics provides a global assessment of the risk levels and its differentiation in ship types and main types of ship losses. Early studies in the probability of ship loss by foundering and capsizing are reviewed. The approaches used to assess the risk of structural design are addressed. Finally a brief account is given of recent development of using formal safety assessments to support decision making on legislation applicable internationally to maritime transportation

  6. Framework for ecological risk assessment

    International Nuclear Information System (INIS)

    Rodier, D.; Norton, S.

    1992-02-01

    Increased interest in ecological issues such as global climate change, habitat loss, acid deposition, reduced biological diversity, and the ecological impacts of pesticides and toxic chemicals prompts this U.S. Environmental Protection Agency (EPA) report, A Framework for Ecological Risk Assessment ('Framework Report'). The report describes basic elements, or a framework, for evaluating scientific information on the adverse effects of physical and chemical stressors on the environment. The framework offers starting principles and a simple structure as guidance for current ecological risk assessments and as a foundation for future EPA proposals for risk assessment guidelines

  7. Transcriptomic resources for environmental risk assessment: a case study in the Venice lagoon.

    Science.gov (United States)

    Milan, M; Pauletto, M; Boffo, L; Carrer, C; Sorrentino, F; Ferrari, G; Pavan, L; Patarnello, T; Bargelloni, L

    2015-02-01

    The development of new resources to evaluate the environmental status is becoming increasingly important representing a key challenge for ocean and coastal management. Recently, the employment of transcriptomics in aquatic toxicology has led to increasing initiatives proposing to integrate eco-toxicogenomics in the evaluation of marine ecosystem health. However, several technical issues need to be addressed before introducing genomics as a reliable tool in regulatory ecotoxicology. The Venice lagoon constitutes an excellent case, in which the assessment of environmental risks derived from the nearby industrial activities represents a crucial task. In this context, the potential role of genomics to assist environmental monitoring was investigated through the definition of reliable gene expression markers associated to chemical contamination in Manila clams, and their subsequent employment for the classification of Venice lagoon areas. Overall, the present study addresses key issues to evaluate the future outlooks of genomics in the environmental monitoring and risk assessment. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. Comparative Assessment Of Natural Gas Accident Risks

    International Nuclear Information System (INIS)

    Burgherr, P.; Hirschberg, S.

    2005-01-01

    The study utilizes a hierarchical approach including (1) comparative analyses of different energy chains, (2) specific evaluations for the natural gas chain, and (3) a detailed overview of the German situation, based on an extensive data set provided by Deutsche Vereinigung des Gas- und Wasserfaches (DVGW). According to SVGW-expertise DVGW-data can be regarded as fully representative for Swiss conditions due to very similar technologies, management, regulations and safety culture, but has a substantially stronger statistical basis because the German gas grid is about 30 times larger compared to Switzerland. Specifically, the following tasks were carried out by PSI to accomplish the objectives of this project: (1) Consolidation of existing ENSAD data, (2) identification and evaluation of additional sources, (3) comparative assessment of accident risks, and (4) detailed evaluations of specific issues and technical aspects for severe and smaller accidents in the natural gas chain that are relevant under Swiss conditions. (author)

  9. Non-technical issues in safety assessments for nuclear disposal facilities

    International Nuclear Information System (INIS)

    Kallenbach-Herbert, Beate; Brohmann, Bettina

    2010-09-01

    The paper highlights that a comprehensive approach to safety affords the consideration of technology, organisation, personnel and social environment. In several safety relevant contexts of nuclear waste disposal these fields are closely interrelated. The approach for the consideration of socio-scientific aspects which is sketched in this paper supports the systematic treatment of safety relevant non-technical issues in the safety case or in safety assessments for a disposal project. Furthermore it may foster the dialogue among specialists from the technical, the natural- and the socio-scientific field on questions of disposal safety. In this way it may contribute to a better understanding among the affected scientific disciplines in nuclear waste disposal.

  10. Risk assessment instruments in clinical practice.

    Science.gov (United States)

    Côté, Gilles; Crocker, Anne G; Nicholls, Tonia L; Seto, Michael C

    2012-04-01

    To determine whether the items in one of the most widely validated instruments of violence risk assessment, the Historical-Clinical-Risk Management-20 (HCR-20), are used in review board hearings to assess the risk of violence by people found Not Criminally Responsible on account of Mental Disorder (NCRMD). This study was conducted from October 2004 to August 2006 in Quebec's sole forensic psychiatric hospital and 2 large civil psychiatric hospitals designated for the care of people declared NCRMD in the Montreal metropolitan area. The risk assessments presented by clinicians at annual review board hearings and the boards' rationale for the release or detention of people found NCRMD were contrasted with the risk assessments conducted by the research team using the HCR-20. The final sample was comprised of 96 men. Very few of the risk factors identified by prior research (HCR-20 items) were mentioned in the hearing process, whether in clinical reports, discussions during the hearing, or in the disposition justification. The findings confirm that there remains a significant gap between research evidence and risk assessment practice.

  11. Study of the technical specifications for the diesels generator of Juragua NPP

    International Nuclear Information System (INIS)

    Vilaragut Llanes, J.J.

    1996-01-01

    The Technical Specifications of a nuclear power plant specify the limits for plant operation from the safety point of view. These operational safety rules were originally defined on the basis of deterministic analysis and engineering judgement. The Probabilistic safety Assessment, constitutes a tool to analyze of the risk effect in the Technical Specifications Rules, and makes possible a relative comparison of the rules from the risk point of view. This paper studies the technical specifications for the diesels generators of Juragua Nuclear Power Plant and for that was used the probabilistic methodology . It is presented the evaluation of the some parameters as surveillance testing, test interval, repairs time, diesel degradation and AOT

  12. CAPRA - Comprehensive Approach to Probabilistic Risk Assessment: international initiative for risk management effectiveness

    OpenAIRE

    Cardona, Omar Darío; Ordaz, Mario G.; Reinoso, Eduardo; Yamín, Luis; Barbat Barbat, Horia Alejandro

    2012-01-01

    Understanding disaster risk due to hazard events, such as earthquakes, creates powerful incentives for countries to develop planning options and tools to reduce potential damages. This has been the reason why CAPRA, the risk evaluation model described in this paper, was developed with the technical and financial support of the World Bank, the Inter-American Development Bank (IDB) and the International Strategy of United Nations for Disaster Reduction (ISDR). CAPRA is a techno-scientific metho...

  13. The role of risk perception and technical information in scientific debates over nuclear waste storage

    International Nuclear Information System (INIS)

    Jenkins-Smith, Hank C.; Silva, Carol L.

    1998-01-01

    This article examines how members of the lay public factor risk perceptions, trust and technical information from differing scientific sources into policy judgements about potentially hazardous facilities. Focusing on radwaste storage repositories, we examine how members of the public filter new information about potential hazards through risk perceptions, and adjust their own beliefs about risks in light of that information. Scientists play a large (and increasing) role in public policy debates concerning nuclear waste issues, in which public perceptions of human health and environmental risks often differ substantially from scientific consensus about those risks. Public concerns and uncertainties are compounded when scientists from competing groups (government agencies, scientific institutions, industries, and interest groups) make different claims about the likely health and environmental consequences of different policy options. We show the processes by which the public receive and process scientific information about nuclear waste management risks using data taken from interviews with 1800 randomly selected individuals (1200 in New Mexico, and 600 nationwide). Among the more important findings are: (1) members of the public are able to make quite reasonable estimates about what kinds of positions on the risks of nuclear waste disposal will be taken by scientists from differing organizations (e.g. scientists from environmental groups, government agencies, or the nuclear industry); (2) in assessing the credibility of scientific claims, members of the public place great emphasis on the independence of the scientists from those who fund the research; and (3) prior expectations about the positions (or expected biases) of scientists from different organizations substantially affects the ways in which members of the public weigh (and utilize) information that comes from these scientists

  14. A systems approach to risk assessment: Application to methylmercury from coal combustion

    Energy Technology Data Exchange (ETDEWEB)

    Saroff, L. [Dept. of Energy, Washington, DC (United States); Lipfert, F.W.; Moskowitz, P.D. [Brookhaven National Lab., Upton, NY (United States)

    1995-01-01

    The Department of Energy (DOE) asked Brookhaven National Laboratory (BNL) to perform a probabilistic assessment of the health risks associated with Hg from coal-fired power plants. The objective of the assessment is to estimate the incremental health risks that might ensue from a typical coal-fired power plant, together with their uncertainties, taking into account existing background levels and the actual adverse health effects that have previously been associated with exposure to various Hg species. Mercury has a long history of association with adverse neurological effects at high exposure levels. The most important current exposure pathway has been found to be ingestion of fish containing methylmercury (MeHg), which is the end product of bioconcentration moving up the aquatic food chain. Mercury can enter natural waters from either industrial discharges or from atmospheric deposition of various inorganic Ho. compounds. Because of the worldwide background and the existence of local emissions sources, Hg deposition must be considered on local, regional and global scales. The regulatory technical challenge presented by methy1mercury is to protect public health without foreclosing an appreciable a portion of the food supply or impacting on the lifestyles of North American native populations. This paper presents an abbreviated account of the DOE/BNL risk assessment, as viewed from a systems perspective. We review the structure of the model, the sources of data used, the assumptions that were made, and the interpretation of the findings. Since publication of the first risk assessment report, we have refined our estimates of local atmospheric dispersion and deposition and {open_quotes}calibrated{close_quotes} the pharmacokinetic portion of the model against observations.

  15. Reevaluating Interrater Reliability in Offender Risk Assessment

    NARCIS (Netherlands)

    van der Knaap, L.M.; Leenarts, L.E.W.; Born, M.P.; Oosterveld, P.

    2012-01-01

    Offender risk and needs assessment, one of the pillars of the risk-need-responsivity model of offender rehabilitation, usually depends on raters assessing offender risk and needs. The few available studies of interrater reliability in offender risk assessment are, however, limited in the

  16. LAVA: a conceptual framework for automated risk assessment

    International Nuclear Information System (INIS)

    Smith, S.T.; Brown, D.C.; Erkkila, T.H.; FitzGerald, P.D.; Lim, J.J.; Massagli, L.; Phillips, J.R.; Tisinger, R.M.

    1986-01-01

    At the Los Alamos National Laboratory we are developing the framework for generating knowledge-based systems that perform automated risk analyses on an organization's assets. An organization's assets can be subdivided into tangible and intangible assets. Tangible assets include facilities, materiel, personnel, and time, while intangible assets include such factors as reputation, employee morale, and technical knowledge. The potential loss exposure of an asset is dependent upon the threats (both static and dynamic), the vulnerabilities in the mechanisms protecting the assets from the threats, and the consequences of the threats successfully exploiting the protective systems vulnerabilities. The methodology is based upon decision analysis, fuzzy set theory, natural-language processing, and event-tree structures. The Los Alamos Vulnerability and Risk Assessment (LAVA) methodology has been applied to computer security. LAVA is modeled using an interactive questionnaire in natural language and is fully automated on a personal computer. The program generates both summary reports for use by both management personnel and detailed reports for use by operations staff. LAVA has been in use by the Nuclear Regulatory Commission and the National Bureau of Standards for nearly two years and is presently under evaluation by other governmental agencies. 7 refs

  17. Quantitative risk assessment system (QRAS)

    Science.gov (United States)

    Weinstock, Robert M (Inventor); Smidts, Carol S (Inventor); Mosleh, Ali (Inventor); Chang, Yung-Hsien (Inventor); Swaminathan, Sankaran (Inventor); Groen, Francisco J (Inventor); Tan, Zhibin (Inventor)

    2001-01-01

    A quantitative risk assessment system (QRAS) builds a risk model of a system for which risk of failure is being assessed, then analyzes the risk of the system corresponding to the risk model. The QRAS performs sensitivity analysis of the risk model by altering fundamental components and quantifications built into the risk model, then re-analyzes the risk of the system using the modifications. More particularly, the risk model is built by building a hierarchy, creating a mission timeline, quantifying failure modes, and building/editing event sequence diagrams. Multiplicities, dependencies, and redundancies of the system are included in the risk model. For analysis runs, a fixed baseline is first constructed and stored. This baseline contains the lowest level scenarios, preserved in event tree structure. The analysis runs, at any level of the hierarchy and below, access this baseline for risk quantitative computation as well as ranking of particular risks. A standalone Tool Box capability exists, allowing the user to store application programs within QRAS.

  18. Methods of assessing nuclear power plant risks

    International Nuclear Information System (INIS)

    Skvarka, P.; Kovacz, Z.

    1985-01-01

    The concept of safety evalution is based on safety criteria -standards or set qualitative values of parameters and indices used in designing nuclear power plants, incorporating demands on the quality of equipment and operation of the plant, its siting and technical means for achieving nuclear safety. The concepts are presented of basic and optimal risk values. Factors are summed up indispensable for the evaluation of the nuclear power plant risk and the present world trend of evaluation based on probability is discussed. (J.C.)

  19. Ecosystem services as assessment endpoints for ecological risk assessment.

    Science.gov (United States)

    Munns, Wayne R; Rea, Anne W; Suter, Glenn W; Martin, Lawrence; Blake-Hedges, Lynne; Crk, Tanja; Davis, Christine; Ferreira, Gina; Jordan, Steve; Mahoney, Michele; Barron, Mace G

    2016-07-01

    Ecosystem services are defined as the outputs of ecological processes that contribute to human welfare or have the potential to do so in the future. Those outputs include food and drinking water, clean air and water, and pollinated crops. The need to protect the services provided by natural systems has been recognized previously, but ecosystem services have not been formally incorporated into ecological risk assessment practice in a general way in the United States. Endpoints used conventionally in ecological risk assessment, derived directly from the state of the ecosystem (e.g., biophysical structure and processes), and endpoints based on ecosystem services serve different purposes. Conventional endpoints are ecologically important and susceptible entities and attributes that are protected under US laws and regulations. Ecosystem service endpoints are a conceptual and analytical step beyond conventional endpoints and are intended to complement conventional endpoints by linking and extending endpoints to goods and services with more obvious benefit to humans. Conventional endpoints can be related to ecosystem services even when the latter are not considered explicitly during problem formulation. To advance the use of ecosystem service endpoints in ecological risk assessment, the US Environmental Protection Agency's Risk Assessment Forum has added generic endpoints based on ecosystem services (ES-GEAE) to the original 2003 set of generic ecological assessment endpoints (GEAEs). Like conventional GEAEs, ES-GEAEs are defined by an entity and an attribute. Also like conventional GEAEs, ES-GEAEs are broadly described and will need to be made specific when applied to individual assessments. Adoption of ecosystem services as a type of assessment endpoint is intended to improve the value of risk assessment to environmental decision making, linking ecological risk to human well-being, and providing an improved means of communicating those risks. Integr Environ Assess Manag

  20. Methodology for assessing the safety of Hydrogen Systems: HyRAM 1.1 technical reference manual

    Energy Technology Data Exchange (ETDEWEB)

    Groth, Katrina; Hecht, Ethan; Reynolds, John Thomas; Blaylock, Myra L.; Erin E. Carrier

    2017-03-01

    The HyRAM software toolkit provides a basis for conducting quantitative risk assessment and consequence modeling for hydrogen infrastructure and transportation systems. HyRAM is designed to facilitate the use of state-of-the-art science and engineering models to conduct robust, repeatable assessments of hydrogen safety, hazards, and risk. HyRAM is envisioned as a unifying platform combining validated, analytical models of hydrogen behavior, a stan- dardized, transparent QRA approach, and engineering models and generic data for hydrogen installations. HyRAM is being developed at Sandia National Laboratories for the U. S. De- partment of Energy to increase access to technical data about hydrogen safety and to enable the use of that data to support development and revision of national and international codes and standards. This document provides a description of the methodology and models contained in the HyRAM version 1.1. HyRAM 1.1 includes generic probabilities for hydrogen equipment fail- ures, probabilistic models for the impact of heat flux on humans and structures, and computa- tionally and experimentally validated analytical and first order models of hydrogen release and flame physics. HyRAM 1.1 integrates deterministic and probabilistic models for quantifying accident scenarios, predicting physical effects, and characterizing hydrogen hazards (thermal effects from jet fires, overpressure effects from deflagrations), and assessing impact on people and structures. HyRAM is a prototype software in active development and thus the models and data may change. This report will be updated at appropriate developmental intervals.

  1. Using toxicokinetic-toxicodynamic modeling as an acute risk assessment refinement approach in vertebrate ecological risk assessment.

    Science.gov (United States)

    Ducrot, Virginie; Ashauer, Roman; Bednarska, Agnieszka J; Hinarejos, Silvia; Thorbek, Pernille; Weyman, Gabriel

    2016-01-01

    Recent guidance identified toxicokinetic-toxicodynamic (TK-TD) modeling as a relevant approach for risk assessment refinement. Yet, its added value compared to other refinement options is not detailed, and how to conduct the modeling appropriately is not explained. This case study addresses these issues through 2 examples of individual-level risk assessment for 2 hypothetical plant protection products: 1) evaluating the risk for small granivorous birds and small omnivorous mammals of a single application, as a seed treatment in winter cereals, and 2) evaluating the risk for fish after a pulsed treatment in the edge-of-field zone. Using acute test data, we conducted the first tier risk assessment as defined in the European Food Safety Authority (EFSA) guidance. When first tier risk assessment highlighted a concern, refinement options were discussed. Cases where the use of models should be preferred over other existing refinement approaches were highlighted. We then practically conducted the risk assessment refinement by using 2 different models as examples. In example 1, a TK model accounting for toxicokinetics and relevant feeding patterns in the skylark and in the wood mouse was used to predict internal doses of the hypothetical active ingredient in individuals, based on relevant feeding patterns in an in-crop situation, and identify the residue levels leading to mortality. In example 2, a TK-TD model accounting for toxicokinetics, toxicodynamics, and relevant exposure patterns in the fathead minnow was used to predict the time-course of fish survival for relevant FOCUS SW exposure scenarios and identify which scenarios might lead to mortality. Models were calibrated using available standard data and implemented to simulate the time-course of internal dose of active ingredient or survival for different exposure scenarios. Simulation results were discussed and used to derive the risk assessment refinement endpoints used for decision. Finally, we compared the

  2. Hanford Site baseline risk assessment methodology

    International Nuclear Information System (INIS)

    1993-03-01

    This methodology has been developed to prepare human health and environmental evaluations of risk as part of the Comprehensive Environmental Response, Compensation, and Liability Act remedial investigations (RIs) and the Resource Conservation and Recovery Act facility investigations (FIs) performed at the Hanford Site pursuant to the Hanford Federal Facility Agreement and Consent Order referred to as the Tri-Party Agreement. Development of the methodology has been undertaken so that Hanford Site risk assessments are consistent with current regulations and guidance, while providing direction on flexible, ambiguous, or undefined aspects of the guidance. The methodology identifies Site-specific risk assessment considerations and integrates them with approaches for evaluating human and environmental risk that can be factored into the risk assessment program supporting the Hanford Site cleanup mission. Consequently, the methodology will enhance the preparation and review of individual risk assessments at the Hanford Site

  3. Methodological guide for risk assessment and management of industrial sites contaminated with radionuclides

    International Nuclear Information System (INIS)

    Oudiz, A.; Brenot, J.; Cessac, B.; Charbonneau, P.; Maigne, J.P.; Santucci, P.

    2000-01-01

    At the request of the French ministries of health and environment, IPSN was asked to elaborate a methodological guide for risk assessment and management of industrial sites contaminated with radionuclides. This guide is devoted to local administration, technical organisms and more generally to all the relevant stakeholders involved with the choice of a rehabilitation strategy, according to the future use of the site. The methodology to be presented is designed to fit with the different types of 'risk governance', according to circumstances: - when an industrial site is relatively small, with rather restricted zones of contamination, and no specific social concern, management may rely essentially upon radiological expertise, using generic reference levels, - when the site is larger, with spread out contamination, risk assessment and management of the site may become more controversial, namely because uncertainties remain about the effective magnitude of the contamination and no low cost solution appears to exist in view of rehabilitation. In this case, an open procedure is required, which combines technical expertise and involvement of stakeholders, in view of improving the risk assessment process as well as trying to get a better understanding of the benefits and drawbacks of different rehabilitation strategies. The methodology consists of six main steps : - Initiating the process, Pre-diagnosis, Initial diagnosis, Simplified risk assessment, Detailed risk assessment, Decision aiding in view of letting the stakeholders defining the solution appropriate to the local context. The paper will present how the risk assessment and management process can be aportionated to the importance of the problem to be solved. As far as possible, simplified risk assessment should provide information allowing the definition of the appropriate strategy. In this case, stakeholders involvement is mainly devoted to determine: - whether the site can be affected to a given use without

  4. Social amplification of risk: a conceptual framework

    International Nuclear Information System (INIS)

    Kasperson, R.E.; Renn, O.; Slovic, P.; Brown, H.S.; Emel, J.; Goble, R.; Kasperson, J.X.; Ratick, S.

    1988-01-01

    One of the most perplexing problems in risk analysis is why some relatively minor risks or risk events, as assessed by technical experts, often elicit strong public concerns and result in substantial impacts upon society and economy. This article sets forth a conceptual framework that seeks to link systematically the technical assessment of risk with psychological, sociological, and cultural perspectives of risk perception and risk-related behavior. The main thesis is that hazards interact with psychological, social, institutional, and cultural processes in ways that may amplify or attenuate public responses to the risk or risk event. A structural description of the social amplification of risk is now possible. Amplification occurs at two stages: in the transfer of information about the risk, and in the response mechanisms of society. Signals about risk are processed by individual and social amplification stations, including the scientist who communicates the risk assessment, the news media, cultural groups, interpersonal networks, and others. Key steps of amplifications can be identified at each stage. The amplified risk leads to behavioral responses, which, in turn, result in secondary impacts. Models are presented that portray the elements and linkages in the proposed conceptual framework

  5. Risk based knowledge assessments: towards a toolbox for managing key knowledge assets

    International Nuclear Information System (INIS)

    Bright, Clive

    2008-01-01

    Full text: It is now well acknowledged that considerable Knowledge Management (KM) issues are faced by national and international nuclear communities. Much of these problems relate to issues of an ageing workforce and the significantly reduced influx of new generation of nuclear engineers and scientists. The management discipline of KM contains a broad spectrum of methods and techniques. However, the effective implementation of a KM strategy requires the selection and deployment of appropriate and targeted approaches that are pertinent to the particular issues of the technical or business area within an organisation. A clear strategy is contingent upon an assessment of what are the knowledge areas and what are the key (knowledge) risk areas. In particular the following issues have to be addressed: 'what knowledge exists?', 'what is the nature and format of that knowledge?' and 'what knowledge is key to our continued, safe, and effective operation?'. Answers to such questions will enable an organisation to prioritise KM effort and employ subsequent KM approaches that are appropriate. Subsequent approaches ranging from the utilisation of information technologies, such as databases; knowledge retention methods; and the setting up of Community of Practices to share knowledge and experience. This paper considers a risk assessment based approach to KM. In so doing the paper extends work previously reported on an approach to conducting knowledge audits by considering the integration of that approach with approaches to (knowledge) risk assessment. The paper also provides a brief review of the various KM approaches that can act to reduce the level of risk faced by an organisation. The paper concludes by reflecting upon the role, value of deploying such a risk based approach. (author)

  6. An integrated method for assessing climate-related risks and adaptation alternatives in urban areas

    Directory of Open Access Journals (Sweden)

    Yvonne Andersson-Sköld

    2015-01-01

    Full Text Available The urban environment is a complex structure with interlinked social, ecological and technical structures. Global warming is expected to have a broad variety of impacts, which will add to the complexity. Climate changes will force adaptation, to reduce climate-related risks. Adaptation measures can address one aspect at the time, or aim for a holistic approach to avoid maladaptation. This paper presents a systematic, integrated approach for assessing alternatives for reducing the risks of heat waves, flooding and air pollution in urban settings, with the aim of reducing the risk of maladaptation. The study includes strategies covering different spatial scales, and both the current climate situation and the climate predicted under climate change scenarios. The adaptation strategies investigated included increasing vegetation; selecting density, height and colour of buildings; and retreat or resist (defend against sea-level rise. Their effectiveness was assessed with regard to not only flooding, heat stress and air quality but also with regard to resource use, emissions to air (incl. GHG, soil and water, and people’s perceptions and vulnerability. The effectiveness of the strategies were ranked on a common scale (from −3 to 3 in an integrated assessment. Integrated assessments are recommended, as they help identify the most sustainable solutions, but to reduce the risk of maladaptation they require experts from a variety of disciplines. The most generally applicable recommendation, derived from the integrated assessment here, taking into account both expertise from different municipal departments, literature surveys, life cycle assessments and publics perceptions, is to increase the urban greenery, as it contributes to several positive aspects such as heat stress mitigation, air quality improvement, effective storm-water and flood-risk management, and it has several positive social impacts. The most favourable alternative was compact, mid

  7. Technical evaluation report on the 120 Vac vital instrument buses and inverter Technical Specifications Issue B71

    International Nuclear Information System (INIS)

    St Leger-Barter, G.; White, R.L.

    1982-01-01

    The operation of a Pressurized Water Reactor (PWR) with one of its 120 Vac vital buses energized in an off-normal mode was analyzed. A Probabilistic Risk Assessment was made to determine the increment of risk by energizing a vital bus from an off-site source directly vs energizing it from its normal, uninterruptible source (i.e., a battery/inverter arrangement). The calculations were made based on uninterruptible source energized vital buses as the normal mode. The analysis indicated that a reduction in the incremental risk increase (caused by plant operation with a vital bus being energized in an off-normal mode) can be accomplished by limiting the time permitted in that condition. Currently, the time that a vital bus can be energized in the off-normal mode is not universally time-limited by plant Technical Specifications. Several alternatives for the reduction in incremental risk were examined and their value/impacts were derived. These data indicate that a recommendation be made for a Technical Specification time limitation of 72 hours per year for off-normal energizing a vital bus during operation of a PWR

  8. Review of the Oconee-3 probabilistic risk assessment: external events, core damage frequency. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Hanan, N.A.; Ilberg, D.; Xue, D.; Youngblood, R.; Reed, J.W.; McCann, M.; Talwani, T.; Wreathall, J.; Kurth, P.D.; Bandyopadhyay, K.

    1986-03-01

    A review of the Oconee-3 Probabilistic Risk Assessment (OPRA) was conducted with the broad objective of evaluating qualitatively and quantitatively (as much as possible) the OPRA assessment of the important sequences that are ''externally'' generated and lead to core damage. The review included a technical assessment of the assumptions and methods used in the OPRA within its stated objective and with the limited information available. Within this scope, BNL performed a detailed reevaluation of the accident sequences generated by internal floods and earthquakes and a less detailed review (in some cases a scoping review) for the accident sequences generated by fires, tornadoes, external floods, and aircraft impact. 12 refs., 24 figs., 31 tabs.

  9. Review of the Oconee-3 probabilistic risk assessment: external events, core damage frequency. Volume 2

    International Nuclear Information System (INIS)

    Hanan, N.A.; Ilberg, D.; Xue, D.

    1986-03-01

    A review of the Oconee-3 Probabilistic Risk Assessment (OPRA) was conducted with the broad objective of evaluating qualitatively and quantitatively (as much as possible) the OPRA assessment of the important sequences that are ''externally'' generated and lead to core damage. The review included a technical assessment of the assumptions and methods used in the OPRA within its stated objective and with the limited information available. Within this scope, BNL performed a detailed reevaluation of the accident sequences generated by internal floods and earthquakes and a less detailed review (in some cases a scoping review) for the accident sequences generated by fires, tornadoes, external floods, and aircraft impact. 12 refs., 24 figs., 31 tabs

  10. RELEVANCE OF PROCESS RISK ASSESSMENT IN AIRLINES

    Directory of Open Access Journals (Sweden)

    Oksana G. Feoktistova

    2017-01-01

    Full Text Available The notion of “the concept on assumed risk” that took over from the outdated concept of absolute security is analyzed, the increasing significance of operating risk assessment at the present stage is noted. Some basic risk assessment techniques are considered. Matrix technique of risk assessment is considered more thoroughly, and it may be used in risk assessment of airlines in the context of labour protection management system.The ability to correctly assess risks and develop appropriate precautionary measures will allow airlines to avoid incidents leading to drastic consequences for staff, as well as to direct and indirect costs for the enterprise among which there could be singled out both direct property damage and loss of profit and expenses connected to incident investigation, penalty and compensation payment, loss of business reputation and so on. To reduce the rate of accidents and to develop safe activities skills for airlines staff a risk assessment chart is supposed to be implemented, which will be an efficient accidents prevention involving the staff in the process and making them follow safe working conditions.Process risk assessment is an integral part of assessment of the whole enterprise activity and work efficiency of a department and particular workers evaluation system. Labour protection activity should be based on risk identification and its control. Risk assessment is a keystone of labour protection activity planning.

  11. The use of a checklist improves anaesthesiologists' technical and non-technical performance for simulated malignant hyperthermia management.

    Science.gov (United States)

    Hardy, Jean-Baptiste; Gouin, Antoine; Damm, Cédric; Compère, Vincent; Veber, Benoît; Dureuil, Bertrand

    2018-02-01

    Anaesthesiologists may occasionally manage life-threatening operating room (OR) emergencies. Managing OR emergencies implies real-time analysis of often complicated situations, prompt medical knowledge retrieval, coordinated teamwork and effective decision making in stressful settings. Checklists are recommended to improve performance and reduce the risk of medical errors. This study aimed to assess the usefulness of the French Society of Anaesthesia and Intensive Care's (SFAR) "Malignant Hyperthermia" (MH) checklist on a simulated episode of MH crisis and management thereof by registered anesthesiologists. Twenty-four anaesthesiologists were allocated to 2 groups (checklist and control). Their technical performance in adherence with the SFAR guidelines was assessed by a 30-point score and their non-technical performance was assessed by the Anaesthetists' Non-Technical Skills (ANTS) score. Every task completion was assessed independently. Data are shown as median (first-third quartiles). Anaesthesiologists in the checklist group had higher technical performance scores (24/30 (21.5-25) vs 18/30 (15.5-19.5), P=0.002) and ANTS scores (56.5/60 (47.5-58) vs 48.5/60 (41-50.5), P=0.024). They administered the complete initial dose of dantrolene (2mg/kg) more quickly (15.7 minutes [13.9-18.3] vs 22.4 minutes [18.6-25]) than the control group (P=0.017). However, anaesthesiologists deemed the usability of the checklist to be perfectible. Registered anaesthesiologists' use of the MH checklist during a simulation session widely improved their adherence to guidelines and non-technical skills. This study strongly suggests the benefit of checklist tools for emergency management. Notwithstanding, better awareness and training for anaesthesiologists could further improve the use of this tool. Copyright © 2017 Société française d'anesthésie et de réanimation (Sfar). Published by Elsevier Masson SAS. All rights reserved.

  12. Risk Assessment Strategy for Decommissioning of Fukushima Daiichi Nuclear Power Station

    Directory of Open Access Journals (Sweden)

    Akira Yamaguchi

    2017-03-01

    Full Text Available Risk management of the Fukushima Daiichi Nuclear Power Station decommissioning is a great challenge. In the present study, a risk management framework has been developed for the decommissioning work. It is applied to fuel assembly retrieval from Unit 3 spent fuel pool. Whole retrieval work is divided into three phases: preparation, retrieval, and transportation and storage. First of all, the end point has been established and the success path has been developed. Then, possible threats, which are internal/external and technical/societal/management, are identified and selected. “What can go wrong?” is a question about the failure scenario. The likelihoods and consequences for each scenario are roughly estimated. The whole decommissioning project will continue for several decades, i.e., long-term perspective is important. What should be emphasized is that we do not always have enough knowledge and experience of this kind. It is expected that the decommissioning can make steady and good progress in support of the proposed risk management framework. Thus, risk assessment and management are required, and the process needs to be updated in accordance with the most recent information and knowledge on the decommissioning works.

  13. Risk assessment strategy for decommissioning of Fukushima Daiichi Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Yamaguchi, Akira; Jang, Sung Hoon [The University of Tokyo, Tokyo (Japan); Hida, Kazuki [Nuclear Damage Compensation and Decommissioning Facilitation Corporation, Tokyo (Japan); Yamanaka, Yasunori [Tokyo Electric Power Company Holdings, Tokyo (Japan); Narumiya, Yoshiyuki [The Kansai Electric Power Co., Inc., Osaka (Japan)

    2017-03-15

    Risk management of the Fukushima Daiichi Nuclear Power Station decommissioning is a great challenge. In the present study, a risk management framework has been developed for the decommissioning work. It is applied to fuel assembly retrieval from Unit 3 spent fuel pool. Whole retrieval work is divided into three phases: preparation, retrieval, and transportation and storage. First of all, the end point has been established and the success path has been developed. Then, possible threats, which are internal/external and technical/societal/management, are identified and selected. “What can go wrong?” is a question about the failure scenario. The likelihoods and consequences for each scenario are roughly estimated. The whole decommissioning project will continue for several decades, i.e., long-term perspective is important. What should be emphasized is that we do not always have enough knowledge and experience of this kind. It is expected that the decommissioning can make steady and good progress in support of the proposed risk management framework. Thus, risk assessment and management are required, and the process needs to be updated in accordance with the most recent information and knowledge on the decommissioning works.

  14. Uncertainty quantification in flood risk assessment

    Science.gov (United States)

    Blöschl, Günter; Hall, Julia; Kiss, Andrea; Parajka, Juraj; Perdigão, Rui A. P.; Rogger, Magdalena; Salinas, José Luis; Viglione, Alberto

    2017-04-01

    Uncertainty is inherent to flood risk assessments because of the complexity of the human-water system, which is characterised by nonlinearities and interdependencies, because of limited knowledge about system properties and because of cognitive biases in human perception and decision-making. On top of the uncertainty associated with the assessment of the existing risk to extreme events, additional uncertainty arises because of temporal changes in the system due to climate change, modifications of the environment, population growth and the associated increase in assets. Novel risk assessment concepts are needed that take into account all these sources of uncertainty. They should be based on the understanding of how flood extremes are generated and how they change over time. They should also account for the dynamics of risk perception of decision makers and population in the floodplains. In this talk we discuss these novel risk assessment concepts through examples from Flood Frequency Hydrology, Socio-Hydrology and Predictions Under Change. We believe that uncertainty quantification in flood risk assessment should lead to a robust approach of integrated flood risk management aiming at enhancing resilience rather than searching for optimal defense strategies.

  15. New Metrics for Evaluating Technical Benefits and Risks of DGs Increasing Penetration

    DEFF Research Database (Denmark)

    Akbari, Mohammad Amin; Aghaei, Jamshid; Barani, Mostafa

    2017-01-01

    and risks should be qualified and quantified. This paper introduces several probabilistic indices to evaluate the potential operational effects of increasing penetration of renewable DG units such as wind power and photovoltaic on rural distribution network with the aid of evaluating technical benefits...... and risks trade-offs. A probabilistic generation-load model is suggested to calculate these indices which combine a large number of possible operating conditions of renewable DG units with their probabilities. Temporal and annual indices of voltage profile and line flow related attributes such as Interest...... Voltage Rise (IVR), Risky Voltage Rise (RVR), Risky Voltage Down (RVD), Line Loss Reduction (LLR), Line Loss Increment (LLI) and Line overload flow (LOF) are introduced using probability and expected values of their occurrence. Also, to measure the overall interests and risks of installing DG, composite...

  16. Fundamentals of defining and evaluating technical risks and hazards

    International Nuclear Information System (INIS)

    Schoen, G.

    1982-01-01

    This contribution is concerned with discussions of undefined judicial concepts in the area of Safety engineering from the point of view of science and technology. Concepts like risk assessments, including accident probibility predictions are discussed and condensed in the demand: ''Risk must be acceptably low.'' Acceptability of risk is and remains a question of judgement. This judgement must be based on the specific plant involved, and in the final analysis; should be made on the basis of value judgements of all concerned. Measures and criteria for the acceptability of risk have been developed over the years. They will be determined by safety-related of security maximum acceptable values as stated in the appropriate regulations, as well as through licensing, permits, etc. Experience shows that a continuous expansion, based on safety-related research that would include extensive accident analysis, is needed. Should the status of science and technology change, it could become necessary that the measures or criteria for risk assessment would have to change also. (orig./HSCH) [de

  17. Reevaluating Interrater Reliability in Offender Risk Assessment

    Science.gov (United States)

    van der Knaap, Leontien M.; Leenarts, Laura E. W.; Born, Marise Ph.; Oosterveld, Paul

    2012-01-01

    Offender risk and needs assessment, one of the pillars of the risk-need-responsivity model of offender rehabilitation, usually depends on raters assessing offender risk and needs. The few available studies of interrater reliability in offender risk assessment are, however, limited in the generalizability of their results. The present study…

  18. Nuclear risk assessment for the Mars 2020 mission environmental impact statement.

    Energy Technology Data Exchange (ETDEWEB)

    Clayton, Daniel James; Bignell, John L.; Jones, Christopher Andrew; Rohe, Daniel Peter; Flores, Gregg J.; Bartel, Timothy James; Gelbard, Fred; Le, San; Morrow, Charles.; Potter, Donald L.; Young, Larry W.; Bixler, Nathan E.; Lipinski, Ronald J.

    2014-01-01

    In the summer of 2020, the National Aeronautics and Space Administration (NASA) plans to launch a spacecraft as part of the Mars 2020 mission. One option for the rover on the proposed spacecraft uses a Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) to provide continuous electrical and thermal power for the mission. An alternative option being considered is a set of solar panels for electrical power with up to 80 Light-Weight Radioisotope Heater Units (LWRHUs) for local component heating. Both the MMRTG and the LWRHUs use radioactive plutonium dioxide. NASA is preparing an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act. The EIS will include information on the risks of mission accidents to the general public and on-site workers at the launch complex. This Nuclear Risk Assessment (NRA) addresses the responses of the MMRTG or LWRHU options to potential accident and abort conditions during the launch opportunity for the Mars 2020 mission and the associated consequences. This information provides the technical basis for the radiological risks of both options for the EIS.

  19. Enhancing the ecological risk assessment process.

    Science.gov (United States)

    Dale, Virginia H; Biddinger, Gregory R; Newman, Michael C; Oris, James T; Suter, Glenn W; Thompson, Timothy; Armitage, Thomas M; Meyer, Judith L; Allen-King, Richelle M; Burton, G Allen; Chapman, Peter M; Conquest, Loveday L; Fernandez, Ivan J; Landis, Wayne G; Master, Lawrence L; Mitsch, William J; Mueller, Thomas C; Rabeni, Charles F; Rodewald, Amanda D; Sanders, James G; van Heerden, Ivor L

    2008-07-01

    The Ecological Processes and Effects Committee of the US Environmental Protection Agency Science Advisory Board conducted a self-initiated study and convened a public workshop to characterize the state of the ecological risk assessment (ERA), with a view toward advancing the science and application of the process. That survey and analysis of ERA in decision making shows that such assessments have been most effective when clear management goals were included in the problem formulation; translated into information needs; and developed in collaboration with decision makers, assessors, scientists, and stakeholders. This process is best facilitated when risk managers, risk assessors, and stakeholders are engaged in an ongoing dialogue about problem formulation. Identification and acknowledgment of uncertainties that have the potential to profoundly affect the results and outcome of risk assessments also improves assessment effectiveness. Thus we suggest 1) through peer review of ERAs be conducted at the problem formulation stage and 2) the predictive power of risk-based decision making be expanded to reduce uncertainties through analytical and methodological approaches like life cycle analysis. Risk assessment and monitoring programs need better integration to reduce uncertainty and to evaluate risk management decision outcomes. Postdecision audit programs should be initiated to evaluate the environmental outcomes of risk-based decisions. In addition, a process should be developed to demonstrate how monitoring data can be used to reduce uncertainties. Ecological risk assessments should include the effects of chemical and nonchemical stressors at multiple levels of biological organization and spatial scale, and the extent and resolution of the pertinent scales and levels of organization should be explicitly considered during problem formulation. An approach to interpreting lines of evidence and weight of evidence is critically needed for complex assessments, and it would

  20. Influence of the human reliability in the assessment of the impact on the risk of changes of CLO

    International Nuclear Information System (INIS)

    Martorell, P.; Martorell, S.; Marton, I.; Saiz, M.

    2014-01-01

    Treatment and study of epistemic uncertainties is of special importance in the application of the analysis of probabilistic security to informed decision-making in risk, as points out the guide regulatory 1,174 [1] (Regulatory Guide 1,174, RG1.174). Specifically, the RG 1.177 [2] details of the impact on risk assessment concerning changes in the technical operating specifications (ETF). Based on the framework defined by such regulatory guides, will be assessed the effect of uncertainties epistemic associated with the analysis of human reliability in the context of the limit conditions of operation. As an example of application, will be held a sensitivity study of the time of inoperability Completion Time, the Residual heat removal system. (Author)

  1. ASTARTE: Assessment Strategy and Risk Reduction for Tsunamis in Europe

    Science.gov (United States)

    Baptista, M. A.; Yalciner, A. C.; Canals, M.

    2014-12-01

    Tsunamis are low frequency but high impact natural disasters. In 2004, the Boxing Day tsunami killed hundreds of thousands of people from many nations along the coastlines of the Indian Ocean. Tsunami run-up exceeded 35 m. Seven years later, and in spite of some of the best warning technologies and levels of preparedness in the world, the Tohoku-Oki tsunami in Japan dramatically showed the limitations of scientific knowledge on tsunami sources, coastal impacts and mitigation measures. The experience from Japan raised serious questions on how to improve the resilience of coastal communities, to upgrade the performance of coastal defenses, to adopt a better risk management, and also on the strategies and priorities for the reconstruction of damaged coastal areas. Societal resilience requires the reinforcement of capabilities to manage and reduce risk at national and local scales.ASTARTE (Assessment STrategy And Risk for Tsunami in Europe), a 36-month FP7 project, aims to develop a comprehensive strategy to mitigate tsunami impact in this region. To achieve this goal, an interdisciplinary consortium has been assembled. It includes all CTWPs of NEAM and expert institutions across Europe and worldwide. ASTARTE will improve i) basic knowledge of tsunami generation and recurrence going beyond simple catalogues, with novel empirical data and new statistical analyses for assessing long-term recurrence and hazards of large events in sensitive areas of NEAM, ii) numerical techniques for tsunami simulation, with focus on real-time codes and novel statistical emulation approaches, and iii) methods for assessment of hazard, vulnerability, and risk. ASTARTE will also provide i) guidelines for tsunami Eurocodes, ii) better tools for forecast and warning for CTWPs and NTWCs, and iii) guidelines for decision makers to increase sustainability and resilience of coastal communities. In summary, ASTARTE will develop basic scientific and technical elements allowing for a significant

  2. Pandora - a simulation tool for safety assessments. Technical description and user's guide

    International Nuclear Information System (INIS)

    Ekstroem, Per-Anders

    2010-12-01

    This report documents a flexible simulation tool, Pandora, used in several post closure safety assessments in both Sweden and Finland to assess the radiological dose to man due to releases from radioactive waste repositories. Pandora allows the user to build compartment models to represent the migration and fate of radionuclides in the environment. The tool simplifies the implementation and simulation of radioecological biosphere models in which there exist a large set of radionuclides and input variables. Based on the well-known technical computing software MATLAB and especially its interactive graphical environment Simulink, Pandora receives many benefits. MATLAB/Simulink is a highly flexible tool used for simulations of practically any type of dynamic system; it is widely used, continuously maintained, and often upgraded. By basing the tool on this commercial software package, we gain both the graphical interface provided by Simulink, as well as the ability to access the advanced numerical equation solving routines in MATLAB. Since these numerical methods are well established and quality assured in their MATLAB implementation, the solution methods used in Pandora can be considered to have high level of quality assurance. The structure of Pandora provides clarity in the model format, which means the model itself assists its own documentation, since the model can be understood by inspecting its structure. With the introduction of the external tool Pandas (Pandora assessment tool), version handling and an integrated way of performing the entire calculation chain has been added. Instead of being dependent on other commercial statistical software as Risk for performing probabilistic assessments, they can now be performed within the tool

  3. Availability and use of medical isotopes in Canada : performed as part of a radiological terrorism risk assessment. Technical memorandum

    International Nuclear Information System (INIS)

    Larsson, C.L.

    2004-12-01

    An assessment of the availability of radioactive material used for medical applications in Canada has been performed as part of the CBRN Research and Technology Initiative (CRTI) Project CRTI-02-0024RD (Probabilistic Risk Assessment Tool for Radiological Dispersal Devices). A general list of medical radioisotopes used worldwide was compiled via literature searches and Internet investigations. This list was then compared to all isotopes licenced to healthcare facilities in Canada. Sources of lesser concern for this study, such as noble gases, short-lived isotopes, and radioisotopes not licenced for medical applications in Canada, were eliminated. The remaining sources were then analysed for frequency of use and maximum licenced activity to assess which materials would be of highest concern in relation to radiological terrorism. A detailed description of the application, typical administered activity, and other relevant information for these most common and highest licenced activity medical sources was assembled to feed directly into the risk assessment database. A general discussion of security in healthcare facilities is also given. Due to the constant advances made in medicine, the information relating to licenced isotopes is dynamic and thus requires updating to ensure the database is kept current. (author)

  4. CNSC EOC technical assessment and evaluation initiatives

    International Nuclear Information System (INIS)

    Cole, Christopher

    2014-01-01

    In Canada, multiple layers of government respond to a nuclear emergency. Although the licensee is responsible for all on-site mitigating actions, the Provincial and Municipal governments take responsibility for all off-site decisions such evacuation and the distribution of Potassium Iodide pills. The Federal Government provides support for the Provincial Government as required or requested. The CNSC forms part of the Federal Government and has the unique capability of fully understanding the phenomena of a nuclear accident. As such, the CNSC plays a key role at the federal level, the provincial level, and with the licensee if a nuclear emergency were to unfold. The Emergency Operations Centre (EOC) at the Canadian Nuclear Safety Commission (CNSC) in Ottawa is activated for all events which are leading or could lead to significant on-site or off-site consequences, and where the consequences of the event will be strongly affected by the operator's actions. During a nuclear emergency the CNSC's regulatory role is to provide assurance that appropriate actions are taken to limit the risk to health, safety, security and the environment. A key component to the EOC is the Technical Assessment Section (TAS). The TAS is primarily responsible for diagnosing the state of the accident and providing a prognosis for the accident progression. The section provides a predictive source term and dispersion calculation for both the diagnosis and the prognosis. The associated dose to public and site staff is assessed. The potential dose to safety workers, on-site staff and the public is compared against assessments made by the provincial authorities to confirm that adequate protective measures are implemented. In order to meet this mandate, steps have been taken to put in place both procedures and tools for the TAS. These include in-house developed codes such as the NPP Accident Handbook and VETA as well as the industry standard dispersion and dose code Emergency Response Projection

  5. Phytase application in chewing gum - A technical assessment

    DEFF Research Database (Denmark)

    Nielsen, Anne Veller Friis; Meyer, Anne S.

    2016-01-01

    either prior to ingestion, i.e. in the food, or post ingestion, i.e. in the human gastrointestinal tract. We have assessed the technical aspects of formulation and release of phytase added to chewing gum as a delivery vehicle. Phytases from Aspergillus niger and Escherichia coli incorporated into chewing...... gum were released quantitatively upon chewing and retained phytase activity (50-80% of the enzyme activity added was released within 10 minutes). Initial evaluations of phytase chewing gum shelf life showed good stability after 48 days of storage of the chewing gum at ambient conditions....

  6. Assessing the useability of technical manuals: a successful case history

    International Nuclear Information System (INIS)

    Robbins, J.C.; Johnson, L.M.

    1979-01-01

    The Software Documentation Group of the Computer Science and Services Division of Los Alamos Scientific Laboratory (LASL) conducted a computer documentation user study in 1978. The study was designed to assess the useability of LASL computer documentation. This paper describes the study, reviews the results, and discusses the study's implications for document development. The study itself provides a valuable model that is readily adaptable by anyone interested in assessing document useability. It was done in a short time, at reasonable cost, with substantial payoff in information and improved technical communication

  7. MODELING OF TECHNICAL CHANNELS OF INFORMATION LEAKAGE AT DISTRIBUTED CONTROL OBJECTS

    Directory of Open Access Journals (Sweden)

    Aleksander Vladimirovich Karpov

    2018-05-01

    Full Text Available The significant increase in requirements for distributed control objects’ functioning can’t be realized only at the expense of the widening and strengthening of security control measures. The first step in ensuring the information security at such objects is the analysis of the conditions of their functioning and modeling of technical channels of information leakage. The development of models of such channels is essentially the only method of complete study of their opportunities and it is pointed toward receiving quantitative assessments of the safe operation of compound objects. The evaluation data are necessary to make a decision on the degree of the information security from a leak according to the current criterion. The existing models are developed for the standard concentrated objects and allow to evaluate the level of information security from a leak on each of channels separately, what involves the significant increase in the required protective resource and time of assessment of information security on an object in general. The article deals with a logical-and-probabilistic method of a security assessment of structurally-compound objects. The model of a security leak on the distributed control objects is cited as an example. It is recommended to use a software package of an automated structurally-logistical modeling of compound systems, which allows to evaluate risk of information leakage in the loudspeaker. A possibility of information leakage by technical channels is evaluated and such differential characteristics of the safe operation of the distributed control objects as positive and negative contributions of the initiating events and conditions, which cause a leak are calculated. Purpose. The aim is a quantitative assessment of data risk, which is necessary for justifying the rational composition of organizational and technical protection measures, as well as a variant of the structure of the information security system from a

  8. Methodologies to assess paediatric adiposity.

    LENUS (Irish Health Repository)

    Horan, M

    2014-05-04

    Childhood obesity is associated with increased risk of adult obesity, cardiovascular disease, diabetes and cancer. Appropriate techniques for assessment of childhood adiposity are required to identify children at risk. The aim of this review was to examine core clinical measurements and more technical tools to assess paediatric adiposity.

  9. A framework for combining social impact assessment and risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Mahmoudi, Hossein, E-mail: mahmoudi@uni-hohenheim.de [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Environmental Sciences Research Institute, Shahid Beheshti University, G.C. (Iran, Islamic Republic of); Renn, Ortwin [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany); Vanclay, Frank [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands); Hoffmann, Volker [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Karami, Ezatollah [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)

    2013-11-15

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, ‘risk and social impact assessment’ (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: • A hybrid model to combine SIA and SRA namely RSIA is proposed. • RSIA can provide the proper mechanism to assess social impacts of natural hazards. • RSIA can play the role of ex-post as well as ex-ante assessment. • For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary.

  10. A framework for combining social impact assessment and risk assessment

    International Nuclear Information System (INIS)

    Mahmoudi, Hossein; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    2013-01-01

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, ‘risk and social impact assessment’ (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: • A hybrid model to combine SIA and SRA namely RSIA is proposed. • RSIA can provide the proper mechanism to assess social impacts of natural hazards. • RSIA can play the role of ex-post as well as ex-ante assessment. • For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary

  11. Risk assessment [Chapter 9

    Science.gov (United States)

    Dennis S. Ojima; Louis R. Iverson; Brent L. Sohngen; James M. Vose; Christopher W. Woodall; Grant M. Domke; David L. Peterson; Jeremy S. Littell; Stephen N. Matthews; Anantha M. Prasad; Matthew P. Peters; Gary W. Yohe; Megan M. Friggens

    2014-01-01

    What is "risk" in the context of climate change? How can a "risk-based framework" help assess the effects of climate change and develop adaptation priorities? Risk can be described by the likelihood of an impact occurring and the magnitude of the consequences of the impact (Yohe 2010) (Fig. 9.1). High-magnitude impacts are always...

  12. Risk assessment - black art or science?

    International Nuclear Information System (INIS)

    Moore, G.

    1988-01-01

    Measures of risk can be divided into two categories, those that observe or calculate the risk of a process or project, and those that rely on the level of risk as perceived by the people during the assessment. Collection of data of accidents (where cause and effect are obvious) and experiments on animals which can then be extrapolated to humans, are two ways of risk assessment. Mathematical models and computerized simulations, using either fault tree analysis or Monte Carlo methods are explained simply. Using these methods, experts are able to perceive risk fairly realistically. However, the general public's perception of risk is often quite different, as potential risk is assessed in different ways. The concept of tolerable risk is considered, particularly with reference to nuclear reactors such as Sizewell-B. The need to inform the public of safeguards and safety procedures so they have a better understanding of the risks of nuclear power is stressed. (U.K.)

  13. Severe accident risks: An assessment for five US nuclear power plants: Appendices A, B, and C

    International Nuclear Information System (INIS)

    1990-12-01

    This report summarizes an assessment of the risks from severe accidents in five commercial nuclear power plants in the United States. These risks are measured in a number of ways, including: the estimated frequencies of core damage accidents from internally initiated accidents and externally initiated accidents for two or the plants; the performance of containment structures under severe accident loadings; the potential magnitude of radionuclide release and offsite consequences of such accidents; and the overall risk (the product of accident frequencies and consequences). Supporting this summary report are a large number of reports written under contract to NRC that provide the detailed discussion of the methods used and results obtained in these risk studies. Volume 2 of this report contains three appendices, providing greater detail on the methods used, an example risk calculation, and more detailed discussion of particular technical issues found important in the risk studies

  14. Risk assessment in gas activities according to legislative decree No. 626/94

    International Nuclear Information System (INIS)

    Del Gaudio, P.; Andreani, A.; Brindani, A.; Capizzi, F.; Cervi, G.; Gandausio, C.; Savio, S.; Rossi, G.P.; Viola, M.

    1998-01-01

    Among the latest measures on health and safety (H and S) at work, Legislative Decree 626/94 is the most important step ever taken until now. Following the implementation of a long series of European Directives, the Decree gives the guidelines to be followed in order to safeguard the workers' H and S. Since gas distribution companies are deeply involved in these activities, the Italian Technical Gas Association (ATIG) has issued a paper on D and S focused on the activities of construction, maintenance and management of gas distribution networks. In a series of tables, the article summarizes a long list of the possible actions to be taken during various interventions, detects the sources of potential risks and suggests the main operational precautions. Besides, criteria for risk assessment, a scale of occurrence probabilities and a scale for damage evaluation are given [it

  15. Ecological risk assessment

    National Research Council Canada - National Science Library

    Suter, Glenn W; Barnthouse, L. W. (Lawrence W)

    2007-01-01

    Ecological risk assessment is commonly applied to the regulation of chemicals, the remediation of contaminated sites, the monitoring of importation of exotic organisms, the management of watersheds...

  16. Risk assessment of nonhazardous oil-field waste disposal in salt caverns.

    Energy Technology Data Exchange (ETDEWEB)

    Elcock, D.

    1998-03-05

    In 1996, Argonne National Laboratory (ANL) conducted a preliminary technical and legal evaluation of disposing of nonhazardous oil-field wastes (NOW) into salt caverns. Argonne determined that if caverns are sited and designed well, operated carefully, closed properly, and monitored routinely, they could be suitable for disposing of oil-field wastes. On the basis of these findings, Argonne subsequently conducted a preliminary evaluation of the possibility that adverse human health effects (carcinogenic and noncarcinogenic) could result from exposure to contaminants released from the NOW disposed of in domal salt caverns. Steps used in this evaluation included the following: identifying potential contaminants of concern, determining how humans could be exposed to these contaminants, assessing contaminant toxicities, estimating contaminant intakes, and calculating human cancer and noncancer risk estimates. Five postclosure cavern release scenarios were assessed. These were inadvertent cavern intrusion, failure of the cavern seal, failure of the cavern through cracks, failure of the cavern through leaky interbeds, and a partial collapse of the cavern roof. Assuming a single, generic, salt cavern and generic oil-field wastes, potential human health effects associated with constituent hazardous substances (arsenic, benzene, cadmium, and chromium) were assessed under each of these scenarios. Preliminary results provided excess cancer risk and hazard index (referring to noncancer health effects) estimates that were well within the US Environmental Protection Agency (EPA) target range for acceptable exposure risk levels. These results led to the preliminary conclusion that from a human health perspective, salt caverns can provide an acceptable disposal method for nonhazardous oil-field wastes.

  17. Risk assessment of nonhazardous oil-field waste disposal in salt caverns

    International Nuclear Information System (INIS)

    Elcock, D.

    1998-01-01

    In 1996, Argonne National Laboratory (ANL) conducted a preliminary technical and legal evaluation of disposing of nonhazardous oil-field wastes (NOW) into salt caverns. Argonne determined that if caverns are sited and designed well, operated carefully, closed properly, and monitored routinely, they could be suitable for disposing of oil-field wastes. On the basis of these findings, Argonne subsequently conducted a preliminary evaluation of the possibility that adverse human health effects (carcinogenic and noncarcinogenic) could result from exposure to contaminants released from the NOW disposed of in domal salt caverns. Steps used in this evaluation included the following: identifying potential contaminants of concern, determining how humans could be exposed to these contaminants, assessing contaminant toxicities, estimating contaminant intakes, and calculating human cancer and noncancer risk estimates. Five postclosure cavern release scenarios were assessed. These were inadvertent cavern intrusion, failure of the cavern seal, failure of the cavern through cracks, failure of the cavern through leaky interbeds, and a partial collapse of the cavern roof. Assuming a single, generic, salt cavern and generic oil-field wastes, potential human health effects associated with constituent hazardous substances (arsenic, benzene, cadmium, and chromium) were assessed under each of these scenarios. Preliminary results provided excess cancer risk and hazard index (referring to noncancer health effects) estimates that were well within the US Environmental Protection Agency (EPA) target range for acceptable exposure risk levels. These results led to the preliminary conclusion that from a human health perspective, salt caverns can provide an acceptable disposal method for nonhazardous oil-field wastes

  18. A Wide Area Risk Assessment Framework for Underwater Military Munitions Response

    Science.gov (United States)

    Holland, K. T.; Calantoni, J.

    2017-12-01

    Our objective was to develop a prototype statistical framework supporting Wide Area Assessment and Remedial Investigation decisions relating to the risk of unexploded ordnance and other military munitions concentrated in underwater environments. Decision making involving underwater munitions is inherently complex due to the high degree of uncertainty in the environmental conditions that force munitions responses (burial, decay, migration, etc.) and associated risks to the public. The prototype framework provides a consistent approach to accurately delineating contaminated areas at underwater munitions sites through the estimation of most probable concentrations. We adapted existing deterministic models and environmental data services for use within statistical modules that allowed the estimation of munition concentration given historic site information and environmental attributes. Ultimately this risk surface can be used to evaluate costs associated with various remediation approaches (e.g. removal, monitoring, etc.). Unfortunately, evaluation of the assessment framework was limited due to the lack of enduser data services from munition site managers. Of the 450 U.S. sites identified as having potential contamination with underwater munitions, assessment of available munitions information (including historic firing or disposal records, and recent ground-truth munitions samples) indicated very limited information in the databases. Example data types include the most probable munition types, approximate firing / disposal dates and locations, and any supportive munition survey or sampling results. However the overall technical goal to integrate trained statistical belief networks with detailed geophysical knowledge of sites, of sensors and of the underwater environment was demonstrated and should allow probabilistic estimates of the most likely outcomes and tradeoffs while managing uncertainty associated with military munitions response.

  19. Execution of a self-directed risk assessment methodology to address HIPAA data security requirements

    Science.gov (United States)

    Coleman, Johnathan

    2003-05-01

    This paper analyzes the method and training of a self directed risk assessment methodology entitled OCTAVE (Operationally Critical Threat Asset and Vulnerability Evaluation) at over 170 DOD medical treatment facilities. It focuses specifically on how OCTAVE built interdisciplinary, inter-hierarchical consensus and enhanced local capabilities to perform Health Information Assurance. The Risk Assessment Methodology was developed by the Software Engineering Institute at Carnegie Mellon University as part of the Defense Health Information Assurance Program (DHIAP). The basis for its success is the combination of analysis of organizational practices and technological vulnerabilities. Together, these areas address the core implications behind the HIPAA Security Rule and can be used to develop Organizational Protection Strategies and Technological Mitigation Plans. A key component of OCTAVE is the inter-disciplinary composition of the analysis team (Patient Administration, IT staff and Clinician). It is this unique composition of analysis team members, along with organizational and technical analysis of business practices, assets and threats, which enables facilities to create sound and effective security policies. The Risk Assessment is conducted in-house, and therefore the process, results and knowledge remain within the organization, helping to build consensus in an environment of differing organizational and disciplinary perspectives on Health Information Assurance.

  20. Method for assessment of the technical potential of the plant agricultural waste suitable for energy purposes in Bulgaria

    International Nuclear Information System (INIS)

    Georgiev, V.

    2004-01-01

    A method for assessment of technical potential of quantitatively important plant agriculture waste; straw from wheat and barley; corn stalks; sunflower stalks and heads; tobacco stalks; orchard prunings and vineyard prunings suitable for energy purposes for Bulgarian conditions is developed. Data for assessment of the technical potential for 2002 using this method are presented. A comparison between technical potential of mentioned wastes, final energy consumption in agriculture and all branches of Bulgarian economy for 2002 is made. (author)

  1. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    Hechanova, A.E.

    2001-01-01

    The Nevada Risk Assessment/Management Program is part of a national effort by the U.S. Department of Energy (Grant DE-FG01-96EW56093) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the Nevada Risk Assessment/Management Program and presents a synopsis of the effort that began in 1995 and will officially conclude on April 30, 2000. (author)

  2. Testing REACH draft technical guidance notes for conducting chemical safety assessments-the experience of a downstream user of a preparation.

    Science.gov (United States)

    Gade, Anne Lill; Ovrebø, Steinar; Hylland, Ketil

    2008-07-01

    The goal of REACH is the safe use of chemicals. This study examines the efficiency and usefulness of two draft technical guidance notes in the REACH Interim Project 3.2-2 for the development of the chemical safety report and exposure scenarios. A case study was carried out for a paint system for protection of structural steel. The focuses of the study were risk assessment of preparations based on Derived No Effect Level (DNEL) and Predicted No Effect Concentrations (PNEC) and on effective and accurate communication in the supply chain. Exposure scenarios and generic descriptions of uses, risk management measures, and exposure determinants were developed. The study showed that communication formats, software tools, and guidelines for chemical risk assessment need further adjustment to preparations and real-life situations. Web platforms may simplify such communication. The downstream formulator needs basic substance data from the substance manufacturer during the pre-registration phase to develop exposure scenarios for preparations. Default values need to be communicated in the supply chain because these were critical for the derivation of applicable risk management demands. The current guidelines which rely on the available toxicological knowledge are insufficient to advise downstream users on how to develop exposure scenarios for preparations.

  3. Development of Risk Assessment Technology for Low Power, Shutdown and Digital I and C System

    International Nuclear Information System (INIS)

    Jang, Seung Cheol; Kang, Hyun Gook; Lim, Ho Gon; Park, Jin Hee; Kang, Dae Il; Eom, Heung Sub; Kim, Man Cheol; Lee, Ho Joong; Kim, Jae Whan; Ha, Jae Joo

    2007-06-01

    There are two technical areas to deal with in the project: the low power and shutdown probabilistic safety assessment (PSA), and the digital I and C PSA. The scope and contents of each area could be summarized as follows: The LPSD PSA Area Ο Quality improvement of the KSNP LPSD PSA model in the following four technical areas; human reliability analysis (HR), system analysis (SY), data analysis (DA) and accident sequence quantification (QU) Ο Development of the LPSD configuration risk management(CRM) model - Study on the methodology for developing a CRM model, so-called ASLOC (Autonomous Shutdown LOgic Creation) - Development of the LPSD CRM model for the units of Ulchin 3 and 4 The Digital I and C PSA Area Ο Development of impact model of ESF-CCS on plant risks - Unavailability analysis of ESF-CCS for APR-1400 - Digital plant risk models for evaluating core damage frequency (CDF) Ο Study on the methodologies for treating digital-specific problems in the digital I and C PSA - Study on the methodology for evaluating safety-critical SW reliability by BBN techniques, including a feasibility study of reliability growth model - Study on the methodology for the safety-critical network system by Markov chain

  4. Caries risk assessment in children

    DEFF Research Database (Denmark)

    Twetman, S

    2016-01-01

    PURPOSE: To summarise the findings of recent systematic reviews (SR) covering caries risk assessment in children, updated with recent primary studies. METHODS: A search for relevant papers published 2012-2014 was conducted in electronic databases. The systematic reviews were quality assessed...... displayed a high risk of bias. CONCLUSIONS: Based on the present summary of literature, it may be concluded: (1) a caries risk assessment should be carried out at the child's first dental visit and reassessments should be done during childhood (D); (2) multivariate models display a better accuracy than...... the use of single predictors and this is especially true for preschool children (C); (3) there is no clearly superior method to predict future caries and no evidence to support the use of one model, program, or technology before the other (C); and (4) the risk category should be linked to appropriate...

  5. [Regional atmospheric environment risk source identification and assessment].

    Science.gov (United States)

    Zhang, Xiao-Chun; Chen, Wei-Ping; Ma, Chun; Zhan, Shui-Fen; Jiao, Wen-Tao

    2012-12-01

    Identification and assessment for atmospheric environment risk source plays an important role in regional atmospheric risk assessment and regional atmospheric pollution prevention and control. The likelihood exposure and consequence assessment method (LEC method) and the Delphi method were employed to build a fast and effective method for identification and assessment of regional atmospheric environment risk sources. This method was applied to the case study of a large coal transportation port in North China. The assessment results showed that the risk characteristics and the harm degree of regional atmospheric environment risk source were in line with the actual situation. Fast and effective identification and assessment of risk source has laid an important foundation for the regional atmospheric environmental risk assessment and regional atmospheric pollution prevention and control.

  6. OPPT workplan risk assessment for Trichloroethylene ...

    Science.gov (United States)

    The assessment will focus on uses of TCE as a degreaser and in consumer products used by individuals in the arts/crafts field. Given the range of endpoints (cancer, non-cancer; the latter includes potential effects on the developing fetus), it is expected that susceptible populations would be children (as bystanders physically near the actual consumer use of the products) and adults of all ages (including pregnant women). Thus, the assessment will focus on all human/lifestages. EPA anticipates issuing draft risk assessments for public review and comment as they are completed. At the conclusion of the review process, if an assessment of specific uses indicates significant risk, EPA will evaluate and pursue appropriate risk reduction actions, as warranted. If an assessment indicates no significant risk, EPA will conclude its current work on assessment of those specified targeted uses of that chemical. Over time, additional chemicals will be added to the work plan as more data are developed and more chemicals screened.

  7. Team Emergency Assessment Measure (TEAM) for the assessment of non-technical skills during resuscitation: Validation of the French version.

    Science.gov (United States)

    Maignan, Maxime; Koch, François-Xavier; Chaix, Jordane; Phellouzat, Pierre; Binauld, Gery; Collomb Muret, Roselyne; Cooper, Simon J; Labarère, José; Danel, Vincent; Viglino, Damien; Debaty, Guillaume

    2016-04-01

    Evaluation of team performances during medical simulation must rely on validated and reproducible tools. Our aim was to build and validate a French version of the Team Emergency Assessment Measure (TEAM) score, which was developed for the assessment of team performance and non-technical skills during resuscitation. A forward and backward translation of the initial TEAM score was made, with the agreement and the final validation by the original author. Ten medical teams were recruited and performed a standardized cardiac arrest simulation scenario. Teams were videotaped and nine raters evaluate non-technical skills for each team thanks to the French TEAM Score. Psychometric properties of the score were then evaluated. French TEAM score showed an excellent reliability with a Cronbach coefficient of 0.95. Mean correlation coefficient between each item and the global score range was 0.78. The inter-rater reliability measured by intraclass correlation coefficient of the global score was 0.93. Finally, expert teams had higher French TEAM score than intermediate and novice teams. The French TEAM score shows good psychometric properties to evaluate team performance during cardiac arrest simulation. Its utilization could help in the assessment of non-technical skills during simulation. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  8. Comprehensive approach for probabilistic risk assessment (CAPRA): international initiative for disaster risk management effectiveness

    OpenAIRE

    Cardona, Omar D.; Ordaz Schroder, Mario Gustavo; Reinoso, Eduardo; Yamín, Luis; Barbat Barbat, Horia Alejandro

    2010-01-01

    Understanding disaster risk due to hazard events, such as earthquakes, creates powerful incentives for countries to develop planning options and tools to reduce potential damages. This has been the reason why CAPRA, the risk evaluation model described in this paper, was developed with the technical and financial support of the World Bank, the Inter-American Development Bank (IDB) and the International Strategy of United Nations for Disaster Reduction (ISDR). CAPRA is a techno-scientific metho...

  9. Tools for Microbiological risk assessment

    DEFF Research Database (Denmark)

    Bassett, john; Nauta, Maarten; Lindqvist, Roland

    can increase the understanding of microbiological risks in foods. It is timely to inform food safety professionals about the availability and utility of MRA tools. Therefore, the focus of this report is to aid the food safety manager by providing a concise summary of the tools available for the MRA......Microbiological Risk Assessment (MRA) has emerged as a comprehensive and systematic approach for addressing the risk of pathogens in specific foods and/or processes. At government level, MRA is increasingly recognised as a structured and objective approach to understand the level of risk in a given...... food/pathogen scenario. Tools developed so far support qualitative and quantitative assessments of the risk that a food pathogen poses to a particular population. Risk can be expressed as absolute numbers or as relative (ranked) risks. The food industry is beginning to appreciate that the tools for MRA...

  10. Modeling for operational event risk assessment

    International Nuclear Information System (INIS)

    Sattison, M.B.

    1997-01-01

    The U.S. Nuclear Regulatory Commission has been using risk models to evaluate the risk significance of operational events in U.S. commercial nuclear power plants for more seventeen years. During that time, the models have evolved in response to the advances in risk assessment technology and insights gained with experience. Evaluation techniques fall into two categories, initiating event assessments and condition assessments. The models used for these analyses have become uniquely specialized for just this purpose

  11. Country risk analysis

    International Nuclear Information System (INIS)

    David, A.

    1992-01-01

    This paper reports that the oil industry has been an internationally based industry that has been heavily dependent on outside financing sources. Historically, financing came from investment houses that, in most cases, participated in the projects as equity investors. However, investment companies can no longer satisfy the capital requirements of the current high level of exploration and development activities. The current trend is to involve commercial banks on a purely lending basis. Commercial banks, by their nature, are risk averse. In the case of oil and gas exploration and production they are asked to take not only technical risk and price risk but geopolitical risk as well. Methods have been developed by commercial banks to reduce technical and price risks to point which enables them to be comfortable with a loan. However, geopolitical risks are more difficult to assess. The risk associated with many countries are the nationalization of the investment, new tax restrictions, restriction of currency movements, and/or revisions to the production sharing agreements

  12. Sandia Transportation Technical Environmental Information Center and its application to transportation risk analyses

    International Nuclear Information System (INIS)

    Foley, J.T.; Davidson, C.A.; McClure, J.D.

    1978-01-01

    Purpose of this paper is to describe an applied research activity which is fundamental to the conduct of transportation analyses: the collection, analysis, storage, and retrieval of information on the intensities of technical environments. This paper describes the collection system which provides such a service to official researchers in transportation analysis and the applications of this information in the area of risk analysis

  13. Transportation radiological risk assessment for the programmatic environmental impact statement: An overview of methodologies, assumptions, and input parameters

    International Nuclear Information System (INIS)

    Monette, F.; Biwer, B.; LePoire, D.; Chen, S.Y.

    1994-01-01

    The U.S. Department of Energy is considering a broad range of alternatives for the future configuration of radioactive waste management at its network of facilities. Because the transportation of radioactive waste is an integral component of the management alternatives being considered, the estimated human health risks associated with both routine and accident transportation conditions must be assessed to allow a complete appraisal of the alternatives. This paper provides an overview of the technical approach being used to assess the radiological risks from the transportation of radioactive wastes. The approach presented employs the RADTRAN 4 computer code to estimate the collective population risk during routine and accident transportation conditions. Supplemental analyses are conducted using the RISKIND computer code to address areas of specific concern to individuals or population subgroups. RISKIND is used for estimating routine doses to maximally exposed individuals and for assessing the consequences of the most severe credible transportation accidents. The transportation risk assessment is designed to ensure -- through uniform and judicious selection of models, data, and assumptions -- that relative comparisons of risk among the various alternatives are meaningful. This is accomplished by uniformly applying common input parameters and assumptions to each waste type for all alternatives. The approach presented can be applied to all radioactive waste types and provides a consistent and comprehensive evaluation of transportation-related risk

  14. Toward an objective assessment of technical skills: a national survey of surgical program directors in Saudi Arabia

    Directory of Open Access Journals (Sweden)

    Alkhayal A

    2012-10-01

    Full Text Available Abdullah Alkhayal,1 Shahla Aldhukair,2 Nahar Alselaim,1 Salah Aldekhayel,1 Sultan Alhabdan,1 Waleed Altaweel,3 Mohi Elden Magzoub,4 Mohammed Zamakhshary1,21Department of Surgery, King Saud bin Abdulaziz University for Health Sciences, Riyadh, Saudi Arabia; 2Public Health Section, King Abdullah International Medical Research Center, Riyadh, Saudi Arabia; 3Urology Department, King Faisal Specialist Hospital and Research Center, Riyadh, Saudi Arabia; 4Department of Medical Education, King Saud bin Abdulaziz University for Health Sciences, Riyadh, Saudi ArabiaBackground: After almost a decade of implementing competency-based programs in postgraduate training programs, the assessment of technical skills remains more subjective than objective. National data on the assessment of technical skills during surgical training are lacking. We conducted this study to document the assessment tools for technical skills currently used in different surgical specialties, their relationship with remediation, the recommended tools from the program directors’ perspective, and program directors’ attitudes toward the available objective tools to assess technical skills.Methods: This study was a cross-sectional survey of surgical program directors (PDs. The survey was initially developed using a focus group and was then sent to 116 PDs. The survey contains demographic information about the program, the objective assessment tools used, and the reason for not using assessment tools. The last section discusses the recommended tools to be used from the PDs’ perspective and the PDs’ attitude and motivation to apply these tools in each program. The associations between the responses to the assessment questions and remediation were statistically evaluated.Results: Seventy-one (61% participants responded. Of the respondents, 59% mentioned using only nonstandardized, subjective, direct observation for technical skills assessment. Sixty percent use only summative

  15. Risk assessment of forensic patients: nurses' role.

    Science.gov (United States)

    Encinares, Maxima; McMaster, Jeff James; McNamee, Jim

    2005-03-01

    One of the unique roles of forensic nurses is to conduct risk assessments. Establishing a therapeutic nurse-patient relationship helps forensic nurses perform accurate and useful risk assessments. Accurate risk assessments can facilitate formulation of individualized risk management plans, designed to meet patients' needs and ensure public safety. The importance of forensic nurses' knowledge and application of appropriate communication and proper documentation cannot be overemphasized.

  16. Total cardiovascular disease risk assessment: a review.

    LENUS (Irish Health Repository)

    Cooney, Marie Therese

    2011-09-01

    The high risk strategy for the prevention of cardiovascular disease (CVD) requires an assessment of an individual\\'s total CVD risk so that the most intensive risk factor management can be directed towards those at highest risk. Here we review developments in the assessment and estimation of total CVD risk.

  17. Risk assessment of carcinogens in food

    International Nuclear Information System (INIS)

    Barlow, Susan; Schlatter, Josef

    2010-01-01

    Approaches for the risk assessment of carcinogens in food have evolved as scientific knowledge has advanced. Early methods allowed little more than hazard identification and an indication of carcinogenic potency. Evaluation of the modes of action of carcinogens and their broad division into genotoxic and epigenetic (non-genotoxic, non-DNA reactive) carcinogens have played an increasing role in determining the approach followed and provide possibilities for more detailed risk characterisation, including provision of quantitative estimates of risk. Reliance on experimental animal data for the majority of risk assessments and the fact that human exposures to dietary carcinogens are often orders of magnitude below doses used in experimental studies has provided a fertile ground for discussion and diverging views on the most appropriate way to offer risk assessment advice. Approaches used by national and international bodies differ, with some offering numerical estimates of potential risks to human health, while others express considerable reservations about the validity of quantitative approaches requiring extrapolation of dose-response data below the observed range and instead offer qualitative advice. Recognising that qualitative advice alone does not provide risk managers with information on which to prioritise the need for risk management actions, a 'margin of exposure' approach for substances that are both genotoxic and carcinogenic has been developed, which is now being used by the World Health Organization and the European Food Safety Authority. This review describes the evolution of risk assessment advice on carcinogens and discusses examples of ways in which carcinogens in food have been assessed in Europe.

  18. Risk assessment of carcinogens in food.

    Science.gov (United States)

    Barlow, Susan; Schlatter, Josef

    2010-03-01

    Approaches for the risk assessment of carcinogens in food have evolved as scientific knowledge has advanced. Early methods allowed little more than hazard identification and an indication of carcinogenic potency. Evaluation of the modes of action of carcinogens and their broad division into genotoxic and epigenetic (non-genotoxic, non-DNA reactive) carcinogens have played an increasing role in determining the approach followed and provide possibilities for more detailed risk characterisation, including provision of quantitative estimates of risk. Reliance on experimental animal data for the majority of risk assessments and the fact that human exposures to dietary carcinogens are often orders of magnitude below doses used in experimental studies has provided a fertile ground for discussion and diverging views on the most appropriate way to offer risk assessment advice. Approaches used by national and international bodies differ, with some offering numerical estimates of potential risks to human health, while others express considerable reservations about the validity of quantitative approaches requiring extrapolation of dose-response data below the observed range and instead offer qualitative advice. Recognising that qualitative advice alone does not provide risk managers with information on which to prioritise the need for risk management actions, a "margin of exposure" approach for substances that are both genotoxic and carcinogenic has been developed, which is now being used by the World Health Organization and the European Food Safety Authority. This review describes the evolution of risk assessment advice on carcinogens and discusses examples of ways in which carcinogens in food have been assessed in Europe.

  19. Risk Assessment Uncertainties in Cybersecurity Investments

    Directory of Open Access Journals (Sweden)

    Andrew Fielder

    2018-06-01

    Full Text Available When undertaking cybersecurity risk assessments, it is important to be able to assign numeric values to metrics to compute the final expected loss that represents the risk that an organization is exposed to due to cyber threats. Even if risk assessment is motivated by real-world observations and data, there is always a high chance of assigning inaccurate values due to different uncertainties involved (e.g., evolving threat landscape, human errors and the natural difficulty of quantifying risk. Existing models empower organizations to compute optimal cybersecurity strategies given their financial constraints, i.e., available cybersecurity budget. Further, a general game-theoretic model with uncertain payoffs (probability-distribution-valued payoffs shows that such uncertainty can be incorporated in the game-theoretic model by allowing payoffs to be random. This paper extends previous work in the field to tackle uncertainties in risk assessment that affect cybersecurity investments. The findings from simulated examples indicate that although uncertainties in cybersecurity risk assessment lead, on average, to different cybersecurity strategies, they do not play a significant role in the final expected loss of the organization when utilising a game-theoretic model and methodology to derive these strategies. The model determines robust defending strategies even when knowledge regarding risk assessment values is not accurate. As a result, it is possible to show that the cybersecurity investments’ tool is capable of providing effective decision support.

  20. Engineering aspects of probabilistic risk assessment

    International Nuclear Information System (INIS)

    vonHerrmann, J.L.; Wood, P.J.

    1984-01-01

    Over the last decade, the use of probabilistic risk assessment (PRA) in the nuclear industry has expanded significantly. In these analyses the probabilities of experiencing certain undesired events (for example, a plant accident which results in damage to the nuclear fuel) are estimated and the consequences of these events are evaluated in terms of some common measure. These probabilities and consequences are then combined to form a representation of the risk associated with the plant studied. In the relatively short history of probabilistic risk assessment of nuclear power plants, the primary motivation for these studies has been the quantitative assessment of public risk associated with a single plant or group of plants. Accordingly, the primary product of most PRAs performed to date has been a 'risk curve' in which the probability (or expected frequency) of exceeding a certain consequence level is plotted against that consequence. The most common goal of these assessments has been to demonstrate the 'acceptability' of the calculated risk by comparison of the resultant risk curve to risk curves associated with other plants or with other societal risks. Presented here are brief descriptions of some alternate applications of PRAs, a discussion of how these other applications compare or contrast with the currently popular uses of PRA, and a discussion of the relative benefits of each