WorldWideScience

Sample records for risk assessment project

  1. Risk assessment and management in IOR projects

    International Nuclear Information System (INIS)

    Goodyear, S.G.; Gregory, A.T.

    1994-01-01

    The application of IOR techniques is one of the investment opportunities open to Exploration and Production companies. A project will only go forward if the perceived balance between the rewards and the risks is acceptable. IOR projects may be ruled out because they are considered to involve significantly higher risks than conventional developments. Therefore, some means of evaluating the actual level of risk may be required if the full economic benefits from IOR techniques are to be realized. Risk assessment is a key element in safety cases, where a well-established methodology for quantifying risk exists. This paper discusses the extension of these methods to IOR project risk assessment. Combining reservoir and IOR technique uncertainties with their impact on project performance allows project risk to be better quantified. The results of the risk assessment are presented in terms of a risk-reward diagram that plots the probability surface for possible project outcomes as a function of NPV (reward) and exposure (risk)

  2. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  3. Risk assessment for construction projects of transport infrastructure objects

    Science.gov (United States)

    Titarenko, Boris

    2017-10-01

    The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.

  4. Rapid Response Risk Assessment in New Project Development

    Science.gov (United States)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  5. Incorporating the Technology Roadmap Uncertainties into the Project Risk Assessment

    International Nuclear Information System (INIS)

    Bonnema, B.E.

    2002-01-01

    This paper describes two methods, Technology Roadmapping and Project Risk Assessment, which were used to identify and manage the technical risks relating to the treatment of sodium bearing waste at the Idaho National Engineering and Environmental Laboratory. The waste treatment technology under consideration was Direct Vitrification. The primary objective of the Technology Roadmap is to identify technical data uncertainties for the technologies involved and to prioritize the testing or development studies to fill the data gaps. Similarly, project management's objective for a multi-million dollar construction project includes managing all the key risks in accordance to DOE O 413.3 - ''Program and Project Management for the Acquisition of Capital Assets.'' In the early stages, the Project Risk Assessment is based upon a qualitative analysis for each risk's probability and consequence. In order to clearly prioritize the work to resolve the technical issues identified in the Technology Roadmap, the issues must be cross- referenced to the project's Risk Assessment. This will enable the project to get the best value for the cost to mitigate the risks

  6. Research into specific risk assessment in project financing

    Directory of Open Access Journals (Sweden)

    Ivana Bestvina Bukvić

    2013-12-01

    Full Text Available An assessment of investment justification in terms of risk enables the decision maker (investor to select, among available alternatives, the one with the most favourable correlation between the expected profit and assumed risk. At the micro level, the uncertainty of business success is extremely high in production activities, which is an additional incentive for taking a comprehensive approach to the issue of investment decision-making and the development of risk assessment techniques applicable in this particular segment of industry. Given the complexity of the manufacturing process, the length of the production cycle, market conditions, and entity-specific risks (which are difficult to measure, projects in manufacturing industry require a detailed and comprehensive assessment of specific risk factors and their cost-effectiveness. Ne - vertheless, since specific risks can be diversified, investment proposal assessments in practice usually do not cover their quantification and analysis. However, the majority of business entities do not have enough active projects in various industries to be able to fully diversify their business and thus minimize the level of specific risks. The impact of specific factors becomes one of the most important elements for business success. This paper analyses how far risk assessment methods regarding specific risks are used in practice. Furthermore, it analyses the significance of specific risks for total investment risk. This study gives new insi - ghts into the significance of specific risks to the overall investment assessment and the need for permanent development of traditionally used investment assessment models.

  7. Transport project evaluation: feasibility risk assessment and scenario forecasting

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2017-01-01

    This paper presents a new approach to transport project assessment in terms of feasibility risk assessment and reference class forecasting. Conventionally, transport project assessment is based upon a Cost-Benefit Analysis (CBA) where evaluation criteria such as Benefit Cost Ratios (BCR...... on the preliminary construction cost estimates. Hereafter, a quantitative risk analysis is provided making use of Monte Carlo simulation. This approach facilitates random input parameters based upon reference class forecasting, hence, a parameter data fit has been performed in order to obtain validated probability...... Scenario Forecasting (RSF) frame. The RSF is anchored in the cost-benefit analysis; thus, it provides decision-makers with a quantitative mean of assessing the transport infrastructure project. First, the RSF method introduces uncertainties within the CBA by applying Optimism Bias uplifts...

  8. Assessing reservoir performance risk in CO2 storage projects

    International Nuclear Information System (INIS)

    Bowden, A.R.; Rigg, A.

    2005-01-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO 2 ) has been the development of a proper methodology to assess and compare alternative CO 2 injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO 2 , and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO 2 injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO 2 injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs

  9. Risk Assessment of Engineering Project Financing Based on PPP Model

    Directory of Open Access Journals (Sweden)

    Ma Qiuli

    2017-01-01

    Full Text Available At present, the project financing channel is single, and the urban facilities are in short supply, and the risk assessment and prevention mechanism of financing should be further improved to reduce the risk of project financing. In view of this, the fuzzy comprehensive evaluation model of project financing risk which combined the method of fuzzy comprehensive evaluation and analytic hierarchy process is established. The scientificalness and effectiveness of the model are verified by the example of the world port project in Luohe city, and it provides basis and reference for engineering project financing based on PPP mode.

  10. Assessing reservoir performance risk in CO{sub 2} storage projects

    Energy Technology Data Exchange (ETDEWEB)

    Bowden, A.R. [URS Corp., San Francisco, CA (United States); Rigg, A. [CRC for Greenhouse Gas Technologies, Canberra (Australia)

    2005-07-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO{sub 2}) has been the development of a proper methodology to assess and compare alternative CO{sub 2} injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO{sub 2}, and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO{sub 2} injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO{sub 2} injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs.

  11. Assessment of Transport Projects: Risk Analysis and Decision Support

    DEFF Research Database (Denmark)

    Salling, Kim Bang

    2008-01-01

    functions. New research proved that specifically two impacts stood out in transport project assessment, namely, travel time savings and construction costs. The final concern of this study has been the fitting of distributions, e.g. by the use of data from major databases developed in which Optimism Bias...... choosing probability distributions and performing real term data fits. The perspective of this Ph.D. study presents newer and better understanding of assigning risks within assessment of transport projects....

  12. The impact of the human genome project on risk assessment

    International Nuclear Information System (INIS)

    Katarzyna Doerffer; Paul Unrau.

    1996-01-01

    The radiation protection approach to risk assessment assumes that cancer induction following radiation exposure is purely random. Present risk assessment methods derive risk from cancer incidence frequencies in exposed populations and associate disease outcomes totally with the level of exposure to ionizing red aeon. Exposure defines a risk factor that affects the probability of the disease outcome. But cancer risk can be affected by other risk factors such as underlying genetic factors (predisposition) of the exposed organism. These genetic risk factors are now becoming available for incorporation into ionizing radiation risk assessment Progress in the Human Genome Project (HOP) will lead to direct assays to measure the effects of genetic risk determinants in disease outcomes. When all genetic risk determinants are known and incorporated into risk assessment it will be possible to reevaluate the role of ionizing radiation in the causation of cancer. (author)

  13. Revenue Risk Modelling and Assessment on BOT Highway Project

    Science.gov (United States)

    Novianti, T.; Setyawan, H. Y.

    2018-01-01

    The infrastructure project which is considered as a public-private partnership approach under BOT (Build-Operate-Transfer) arrangement, such as a highway, is risky. Therefore, assessment on risk factors is essential as the project have a concession period and is influenced by macroeconomic factors and consensus period. In this study, pre-construction risks of a highway were examined by using a Delphi method to create a space for offline expert discussions; a fault tree analysis to map intuition of experts and to create a model from the underlying risk events; a fuzzy logic to interpret the linguistic data of risk models. The loss of revenue for risk tariff, traffic volume, force majeure, and income were then measured. The results showed that the loss of revenue caused by the risk tariff was 10.5% of the normal total revenue. The loss of revenue caused by the risk of traffic volume was 21.0% of total revenue. The loss of revenue caused by the force majeure was 12.2% of the normal income. The loss of income caused by the non-revenue events was 6.9% of the normal revenue. It was also found that the volume of traffic was the major risk of a highway project because it related to customer preferences.

  14. Risk assessment framework on time impact: Infrastructure projects in soft soil during construction stage

    Science.gov (United States)

    Low, W. W.; Wong, K. S.; Lee, J. L.

    2018-04-01

    With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.

  15. Risk variables in evaluation of transport projects

    Science.gov (United States)

    Vařbuchta, Petr; Kovářová, Hana; Hromádka, Vít; Vítková, Eva

    2017-09-01

    Depending on the constantly increasing demands on assessment of investment projects, especially assessment of large-scale projects in transport and important European projects with wide impacts, there is constantly increasing focus on risk management, whether to find mitigations, creating corrective measures or their implementation in assessment, especially in the context of Cost-Benefit analysis. To project assessment is often used implementation of certain risk variables, which can generate negative impacts of project outputs in framework of assess. Especially in case of transportation infrastructure projects is taken much emphasis on the influence of risk variables. However, currently in case of assessment of transportation projects is in Czech Republic used a few risk variables, which occur in the most projects. This leads to certain limitation in framework of impact assessment of risk variables. This papers aims to specify a new risk variables and process of applying them to already executed project assessment. Based on changes generated by new risk variables will be evaluated differences between original and adapted assessment.

  16. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    Science.gov (United States)

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  17. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  18. Risk Assessment in Financial Feasibility of Tanker Project Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Muhammad Badrus Zaman

    2017-09-01

    Full Text Available Every ship project would not be apart from risk and uncertainty issues. The inappropriate risk assessment process would have long-term impact, such as financial loss. Thus, risk and uncertainties analysis would be a very important process in financial feasibility determination of the project. This study analyzes the financial feasibility of 17,500 LTDW tanker project. Risk and uncertainty are two differentiated terminologies in this study, where risk focuses on operational risk due to shipbuilding process nonconformity to shipowner finance, while uncertainty focuses on variable costs that affect project cash flows. There are three funding scenarios in this study, where the percentage of funding with own capital and bank loan in scenario 1 is 100% : 0%, scenario 2 is 75% : 25%, and scenario 3 is 50% : 50%. Monte Carlo simulation method was applied to simulate the acceptance criteria, such as net present value (NPV, internal rate of return (IRR, payback period (PP, and profitability index (PI. The results of simulation show that 17,500 LTDW tanker project funding by scenario 1, 2 and 3 are feasible to run, where probability of each acceptance criteria was greater than 50%. Charter rate being the most sensitive uncertainty over project's financial feasibility parameters.

  19. Security Risk Assessment in Software Development Projects

    OpenAIRE

    Svendsen, Heidi

    2017-01-01

    Software security is increasing in importance, linearly with vulnerabilities caused by software flaws. It is not possible to spend all the project s resources on software security. To spend the resources given to security in an effective way, one should know what is most important to protect. By performing a risk analysis the project know which vulnerabilities they face. A risk analysis will prioritise the vulnerabilities, and when the vulnerabilities are prioritised the project know where th...

  20. PECULIARITIES OF ASSESSMENT AND RISK MANAGEMENT IN INNOVATIVE PROJECTS

    Directory of Open Access Journals (Sweden)

    Victor V. Guzhov

    2014-01-01

    Full Text Available The methodological and methodicalbases of risk management in innovativeprojects. Classification of risks. Types of risks depending on the stage of realizationof the innovative project. Investigated thefactors contributing to the emergence ofrisk situations. The basic techniques of risk management of innovation projects.Proposed criteria for the choice of the innovative project to implement in the realsector of the economy.

  1. Risk Identification and Assessment in PPP Infrastructure Projects using Fuzzy Analytical Hierarchy Process and Life-Cycle Methodology

    Directory of Open Access Journals (Sweden)

    Jie Li

    2012-11-01

    Full Text Available To fulfil the increasing demands of the public,Public Private Partnership (PPP has beenincreasingly used to procure infrastructureprojects, such as motor ways, bridges, tunnelsand railways. However, the risks involved inPPP projects are unique and dynamic due tolarge amount of investment and longconcession period. This paper aims to developa risk identification framework from theperspectives of project life cycle, and anassessment framework for risks associatedwith PPP project using fuzzy analyticalhierarchy process (AHP. First the paperreviews the current literature to identifycommon risks in PPP infrastructure projectsand classification methods used. The risksidentified from the literature were classifiedusing project life cycle perspectives. Followingthat, the paper presents the advantages offuzzy AHP. Furthermore, the paper provides aframework for assessment of risks in PPPprojects followed by an illustrative examplewhere the data was obtained from surveyquestionnaires. The paper concludes that risksassociated in PPP infrastructure projects areunique and therefore it is beneficial to classifythem from project life cycle perspectives, andthe proposed fuzzy AHP method is suitable forthe assessment of these risks.

  2. Engineering risk assessment for emergency disposal projects of sudden water pollution incidents.

    Science.gov (United States)

    Shi, Bin; Jiang, Jiping; Liu, Rentao; Khan, Afed Ullah; Wang, Peng

    2017-06-01

    Without an engineering risk assessment for emergency disposal in response to sudden water pollution incidents, responders are prone to be challenged during emergency decision making. To address this gap, the concept and framework of emergency disposal engineering risks are reported in this paper. The proposed risk index system covers three stages consistent with the progress of an emergency disposal project. Fuzzy fault tree analysis (FFTA), a logical and diagrammatic method, was developed to evaluate the potential failure during the process of emergency disposal. The probability of basic events and their combination, which caused the failure of an emergency disposal project, were calculated based on the case of an emergency disposal project of an aniline pollution incident in the Zhuozhang River, Changzhi, China, in 2014. The critical events that can cause the occurrence of a top event (TE) were identified according to their contribution. Finally, advices on how to take measures using limited resources to prevent the failure of a TE are given according to the quantified results of risk magnitude. The proposed approach could be a potential useful safeguard for the implementation of an emergency disposal project during the process of emergency response.

  3. An Assessment of risk response strategies practiced in software projects

    Directory of Open Access Journals (Sweden)

    Vanita Bhoola

    2014-11-01

    Full Text Available Risk management and success in projects are highly intertwined – better approaches to project risk management tend to increase chances of project success in terms of achieving scope & quality, schedule and cost targets. The process of responding to risk factors during a project’s life cycle is a crucial aspect of risk management referred to as risk response strategies, in this paper. The current research explores the status of risk response strategies applied in the software development projects in India. India provides a young IT-savvy English-speaking population, which is also cost effective. Other than the workforce, the environment for implementation of software projects in India is different from the matured economies. Risk management process is a commonly discussed theme, though its implementation in practice has a huge scope for improvement in India. The paper talks about four fundamental treatments to risk response – Avoidance, Transference, Mitigation and Acceptance (ATMA. From a primary data of 302 project managers, the paper attempts to address the risk response factors that lead to successful achievement of project scope & quality, schedule and cost targets, by using a series of regressions followed with Seemingly Unrelated Regression Equations (SURE modelling. Mitigation emerged as the most significant risk response strategy to achieve project targets. Acceptance, transference, and avoidance of risk were mostly manifested in the forms of transparency in communication across stakeholders, careful study of the nature of risks and close coordination between project team, customers/end-users and top management.

  4. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    International Nuclear Information System (INIS)

    Klos, Richard; Wilmot, Roger

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference between

  5. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  6. Leakage Risk Assessment for a Potential CO2 Storage Project in Saskatchewan, Canada

    Energy Technology Data Exchange (ETDEWEB)

    Houseworth, J.E.; Oldenburg, C.M.; Mazzoldi, A.; Gupta, A.K.; Nicot, J.-P.; Bryant, S.L.

    2011-05-01

    A CO{sub 2} sequestration project is being considered to (1) capture CO{sub 2} emissions from the Consumers Cooperative Refineries Limited at Regina, Saskatchewan and (2) geologically sequester the captured CO{sub 2} locally in a deep saline aquifer. This project is a collaboration of several industrial and governmental organizations, including the Petroleum Technology Research Centre (PTRC), Sustainable Development Technology Canada (SDTC), SaskEnvironment Go Green Fund, SaskPower, CCRL, Schlumberger Carbon Services, and Enbridge. The project objective is to sequester 600 tonnes CO{sub 2}/day. Injection is planned to start in 2012 or 2013 for a period of 25 years for a total storage of approximately 5.5 million tonnes CO{sub 2}. This report presents an assessment of the leakage risk of the proposed project using a methodology known as the Certification Framework (CF). The CF is used for evaluating CO{sub 2} leakage risk associated with geologic carbon sequestration (GCS), as well as brine leakage risk owing to displacement and pressurization of brine by the injected CO{sub 2}. We follow the CF methodology by defining the entities (so-called Compartments) that could be impacted by CO{sub 2} leakage, the CO{sub 2} storage region, the potential for leakage along well and fault pathways, and the consequences of such leakage. An understanding of the likelihood and consequences of leakage forms the basis for understanding CO{sub 2} leakage risk, and forms the basis for recommendations of additional data collection and analysis to increase confidence in the risk assessment.

  7. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  8. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  9. Assessing Risk in Costing High-energy Accelerators: from Existing Projects to the Future Linear Collider

    CERN Document Server

    Lebrun, Philippe

    2010-01-01

    High-energy accelerators are large projects funded by public money, developed over the years and constructed via major industrial contracts both in advanced technology and in more conventional domains such as civil engineering and infrastructure, for which they often constitute one-of markets. Assessing their cost, as well as the risk and uncertainty associated with this assessment is therefore an essential part of project preparation and a justified requirement by the funding agencies. Stemming from the experience with large circular colliders at CERN, LEP and LHC, as well as with the Main Injector, the Tevatron Collider Experiments and Accelerator Upgrades, and the NOvA Experiment at Fermilab, we discuss sources of cost variance and derive cost risk assessment methods applicable to the future linear collider, through its two technical approaches for ILC and CLIC. We also address disparities in cost risk assessment imposed by regional differences in regulations, procedures and practices.

  10. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  11. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    Energy Technology Data Exchange (ETDEWEB)

    Klos, Richard; Wilmot, Roger [Galson Sciences Ltd (United Kingdom)

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference

  12. Risk assessment by integrating interpretive structural modeling and Bayesian network, case of offshore pipeline project

    International Nuclear Information System (INIS)

    Wu, Wei-Shing; Yang, Chen-Feng; Chang, Jung-Chuan; Château, Pierre-Alexandre; Chang, Yang-Chi

    2015-01-01

    The sound development of marine resource usage relies on a strong maritime engineering industry. The perilous marine environment poses the highest risk to all maritime work. It is therefore imperative to reduce the risk associated with maritime work by using some analytical methods other than engineering techniques. This study addresses this issue by using an integrated interpretive structure modeling (ISM) and Bayesian network (BN) approach in a risk assessment context. Mitigating or managing maritime risk relies primarily on domain expert experience and knowledge. ISM can be used to incorporate expert knowledge in a systematic manner and helps to impose order and direction on complex relationships that exist among system elements. Working with experts, this research used ISM to clearly specify an engineering risk factor relationship represented by a cause–effect diagram, which forms the structure of the BN. The expert subjective judgments were further transformed into a prior and conditional probability set to be embedded in the BN. We used the BN to evaluate the risks of two offshore pipeline projects in Taiwan. The results indicated that the BN can provide explicit risk information to support better project management. - Highlights: • We adopt an integrated method for risk assessment of offshore pipeline projects. • We conduct semi-structural interview with the experts for risk factor identification. • Interpretive structural modeling helps to form the digraph of Bayesian network (BN) • We perform the risk analysis with the experts by building a BN. • Risk evaluations of two case studies using the BN show effectiveness of the methods

  13. Risk assessment of underpass infrastructure project based on IS0 31000 and ISO 21500 using fishbone diagram and RFMEA (project risk failure mode and effects analysis) method

    Science.gov (United States)

    Purwanggono, Bambang; Margarette, Anastasia

    2017-12-01

    Completion time of highway construction is very meaningful for smooth transportation, moreover expected number of ownership motor vehicle will increase each year. Therefore, this study was conducted with to analyze the constraints that contained in an infrastructure development project. This research was conducted on Jatingaleh Underpass Project, Semarang. This research was carried out while the project is running, on the implementation, this project is experiencing delays. This research is done to find out what are the constraints that occur in execution of a road infrastructure project, in particular that causes delays. The method that used to find the root cause is fishbone diagram to obtain a possible means of mitigation. Coupled with the RFMEA method used to determine the critical risks that must be addressed immediately on road infrastructure project. The result of data tabulation in this study indicates that the most possible mitigation tool to make a Standard Operating Procedure (SOP) recommendations to disrupt utilities that interfere project implementation. Process of risk assessment has been carried out systematically based on ISO 31000:2009 on risk management and for determination of delayed variables, the requirements of process groups according to ISO 21500:2013 on project management were used.

  14. Natural risks assessment and management (project of monograph)

    International Nuclear Information System (INIS)

    Ragozin, A.L.

    1998-01-01

    Full text of publication follows: large-scale theoretic and practical works on the issue of natural risk assessment and management started in Russia in the end of the 80's. By now there has been made a considerable progress, which allowed for the preparation of a collective monograph on the subject mentioned in the title of this abstract. It is supposed to be published in 1999 in order to become a Russian contribution to the International Decade of Natural Disasters Reduction. The monograph included 6 chapters with the following titles: 1. Methodological foundations of natural risk analysis and assessment. 2. Investigating and forecasting natural hazards for the purpose of risk assessment. 3. Assessment of economic, social and ecological damage from natural hazards. 4, Theory of natural risk assessment. 5. Examples of natural risk assessment and mapping. 6. Natural risk management. In the report there is described the content of the monograph and unsolved questions are discussed. Executive editor offers all international experts to cooperate in the compilation of this monograph, which is to be completed by the end of 1998, especially of chapter 5 and 6. (author)

  15. Strategic Risk Assessment

    Science.gov (United States)

    Derleth, Jason; Lobia, Marcus

    2009-01-01

    This slide presentation provides an overview of the attempt to develop and demonstrate a methodology for the comparative assessment of risks across the entire portfolio of NASA projects and assets. It includes information about strategic risk identification, normalizing strategic risks, calculation of relative risk score, and implementation options.

  16. COORDINATES OF A RISK MANAGEMENT PROJECT

    OpenAIRE

    ALEXANDRU OLTEANU; MĂDĂLINA ANTOANETA RĂDOI

    2013-01-01

    High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by movi...

  17. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  18. The Symbiose project: an integrated framework for performing environmental radiological risk assessment

    International Nuclear Information System (INIS)

    Gonze, M.A.; Mourlon, C.; Garcia-Sanchez, L.; Beaugelin, K.; Chen, T.; Le Dizes, S.

    2004-01-01

    Human health and ecological risk assessments usually require the integration of a wide range of environmental data and modelling approaches, with a varying level of detail dependent on the management objectives, the complexity of the site and the level of ignorance about the pollutant behaviour/toxicity. Like most scientists and assessors did it recently, we recognized the need for developing comprehensive, integrated and flexible approaches to risk assessment. To meet these needs, IRSN launched the Symbiose project (2002-2006) which aims first, at designing a framework for integrating and managing data, methods and knowledge of some relevance in radiological risk to humans/biota assessment studies, and second, at implementing this framework in an information management, modelling and calculation platform. Feasibility developments (currently completed) led to the specification of a fully integrated, object-oriented and hierarchical approach for describing the fate, transport and effect of radionuclides in spatially-distributed environmental systems. This innovative approach has then been implemented in a platform prototype, main components of which are a user-friendly and modular simulation environment (e.g. using GoldSim toolbox), and a hierarchical object-oriented biosphere database. Both conceptual and technical developments will be presented here. (author)

  19. Sound transit climate risk reduction project.

    Science.gov (United States)

    2013-09-01

    The Climate Risk Reduction Project assessed how climate change may affect Sound Transit commuter rail, light rail, and express bus : services. The project identified potential climate change impacts on agency operations, assets, and long-term plannin...

  20. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Science.gov (United States)

    Nicol, Sam; Chadès, Iadine

    2017-01-01

    Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  1. General risks for tunnelling projects: An overview

    Science.gov (United States)

    Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda

    2017-10-01

    Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.

  2. Health risk assessment for a MWC ash utilization demonstration project

    International Nuclear Information System (INIS)

    Roffman, H.K.

    1992-01-01

    A Health Risk Assessment (HRA) was conducted for the proposed joint Hennepin County/Municipal Services Corporation (MSC) MSW Ash Utilization Demonstration Project, in which combined HERC ash was shipped to the MSC Pilot Plan near Atlanta, Georgia and used in the production of a synthetic aggregate. The synthetic aggregate, or TAP, will serve as a partial replacement for natural aggregates in a section of bituminous pavement that is proposed to be constructed on Pioneer Trail in the City of Corcoran, Minnesota. In this paper, the assessment compares the following three scenarios: a section of roadway paved using the MSC synthetic aggregate product (TAP) as a replacement for 30 percent of the natural aggregates used in bituminous pavement; a section of regular bituminous (asphalt) pavement; and a section of unpaved road currently in place at the site

  3. Project finance risks - getting it right first time

    International Nuclear Information System (INIS)

    Bain, F.

    1996-01-01

    Bankers seeking to invest in the construction of new power stations by independent power producers, face greater risks than those lending to companies. Independent risk and insurance advisers are used to assess project risk. ''Project finance'' has become increasingly popular as it allows projects to go ahead that could not be supported from sponsors' own resources. In addition, project finance means that various equity partners can join together in a joint venture company and limit their individual risk. Project finance can be delayed by differences between the needs of sponsors, financiers and insurers. The process can be speeded up by foreknowledge of bankers' requirements. (UK)

  4. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Directory of Open Access Journals (Sweden)

    Sam Nicol

    Full Text Available Environmental impact assessment (EIA is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  5. Analysis of existing risk assessments, and list of suggestions

    CERN Document Server

    Heimsch, Laura

    2016-01-01

    The scope of this project was to analyse risk assessments made at CERN and extracting some crucial information about the different methodologies used, profiles of people who make the risk assessments, and gathering information of whether the risk matrix was used and if the acceptable level of risk was defined. Second step of the project was to trigger discussion inside HSE about risk assessment by suggesting a risk matrix and a risk assessment template.

  6. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  7. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  8. Dose and risk assessment approach for the Fernald CERCLA D ampersand D Project

    International Nuclear Information System (INIS)

    Throckmorton, J.D.; Clark, T.R.; Waligora, S.J. Jr.; Haaker, R.F.

    1994-01-01

    At the Fernald Environmental Management Project (FEMP) the uranium processing facilities used from the 1952 through 1989 are near or beyond their intended design life. These current conditions present an increasing probability for future releases of hazardous substances to the environment. To support a decision by the U.S. Department of Energy (DOE) and the Environmental Protection Agency (EPA) to remediate the buildings, a dose and risk assessment was performed to determine the extent of exposure that would be associated with the controlled decontamination and dismantlement (D ampersand D) of the Fernald facilities. A conceptual risk assessment model was developed, with exposure mechanisms and associated pathways for each potential receptor. The three receptor groups were defined as: the remediation workers, other on-site workers (those not performing D ampersand D), and off-site residents. For use in the conceptual model, an airborne source term was developed through process knowledge, other historical information and data, and air sample data from within the facilities. Individual and collective doses and risks were developed for each receptor and for each population group. The risk assessment demonstrated that all exposures resulting from the action would be within the acceptable DOE administrative control level of 2.0 rem per year for occupational workers and the acceptable EPA risk range from 10 -6 to 10 -4 for the general public

  9. Optimization of the cumulative risk assessment of pesticides and biocides using computational techniques: Pilot project

    DEFF Research Database (Denmark)

    Jonsdottir, Svava Osk; Reffstrup, Trine Klein; Petersen, Annette

    This pilot project is intended as the first step in developing a computational strategy to assist in refining methods for higher tier cumulative and aggregate risk assessment of exposure to mixture of pesticides and biocides. For this purpose, physiologically based toxicokinetic (PBTK) models were...

  10. RISK ASSESSMENT IN PROJECT PLANNING USING FMEA AND CRITICAL PATH METHOD

    Directory of Open Access Journals (Sweden)

    Sandra Milena CHOLES ARVILLA

    2014-10-01

    Full Text Available This paper is based upon the research undertaken for the development of the doctoral thesis “Management of software projects based on object-oriented technology”. The study examines the existing risk management practices commonly used for classic software development. The goal is to integrate the elements of the traditional risk management methodologies to create a new agile risk management methodology. The thesis focuses on techniques that can be easily implemented in extreme programming (XP and SCRUM. This study is motivated by the following research questions: What are the elements of existing quality assurance tools that could meet the principles of agile development? And is it possible to use risk estimation for improving quality in agile projects? The thesis presents a synthesis of the most common risk management techniques, as well as an introduction to agile methods XP and SCRUM. The proposal integrates the concepts of Failure Mode and Effect Analysis into the iterative life cycle of an agile software project. The thesis presents a metamodel which integrates the concepts of agile development methodologies: SCRUM and XP with the FMEA concepts for risk quantification. The model was partly implemented into a real development project. Partial results show the improvement in early identification of failures and allowed to reconsider the Sprint plan.

  11. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  12. The relation of risk assessment and health impact assessment

    DEFF Research Database (Denmark)

    Ádám, Balázs; Gulis, Gabriel

    2013-01-01

    than assessing a present situation. As part of this process, however, methods applied in risk assessment are used. Risk assessment typically characterises relation of a well-defined risk factor to a well-defined health outcome. Within HIA usually several individual risk assessments are needed...... of the causal chain from the proposal through related health determinants and risk factors to health outcomes. The stepwise analysis, systematic prioritization and consideration of horizontal interactions between the causal pathways make it feasible to use widely recognized risk assessment methods in the HIA......The level and distribution of health risks in a society is substantially influenced by measures of various policies, programmes or projects. Risk assessment can evaluate the nature, likelihood and severity of an adverse effect. Health impact assessment (HIA) provides similar function when used...

  13. [Application of risk grading and classification for occupational hazards in risk management for a shipbuilding project].

    Science.gov (United States)

    Zeng, Wenfeng; Tan, Qiang; Wu, Shihua; Deng, Yingcong; Liu, Lifen; Wang, Zhi; Liu, Yimin

    2015-12-01

    To investigate the application of risk grading and classification for occupational hazards in risk management for a shipbuilding project. The risk management for this shipbuilding project was performed by a comprehensive application of MES evaluation, quality assessment of occupational health management, and risk grading and classification for occupational hazards, through the methods of occupational health survey, occupational health testing, and occupational health examinations. The results of MES evaluation showed that the risk of occupational hazards in this project was grade 3, which was considered as significant risk; Q value calculated by quality assessment of occupational health management was 0.52, which was considered to be unqualified; the comprehensive evaluation with these two methods showed that the integrated risk rating for this shipbuilding project was class D, and follow- up and rectification were needed with a focus on the improvement in health management. The application of MES evaluation and quality assessment of occupational health management in risk management for occupational hazards can achieve objective and reasonable conclusions and has good applicability.

  14. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  15. RISK MANAGEMENT APPROACHES AND PRACTICES IN IT PROJECTS

    Directory of Open Access Journals (Sweden)

    BRANDAS Claudiu

    2012-07-01

    Full Text Available Risk is identified in project management literature as an important factor influencing IT projects success, and it is relevant for both academic and practitionersn#8217; communities. The paper presents the past and current approaches to risk management in IT projects. The objective of this paper is to compare the different approaches and relate them to existing practices. Project management literature and practice have brought different approaches to risk management, and as a result, many projects ended in failure. We present how risk management is considered in the literature, and we compare the main two approaches: the evaluation approach and the management approach. The contingency approach does not consider risk management to be a specific process as it is an embedded process in the other project management processes. Then, we present the main practices in risk management. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2011 from the main journals for IT project management and found out that the essence of project management is risk management. The risk management practices have a considerable influence on stakeholdersn#8217; perception of project success. But, regardless of the chosen approach, a standard method for identifying, assessing, and responding to risks should be included in any project as this influences the outcome of the project.

  16. Risk-informed ranking of engineering projects

    International Nuclear Information System (INIS)

    Jyrkama, M.; Pandey, M.

    2011-01-01

    Refurbishment planning requires prudent investment decisions with respect to the various systems and components at the station. These decisions are influenced by many factors, including engineering, safety, regulatory, economic, and political constraints. From an engineering perspective, the concept of cost-benefit analysis is a common way to allocate capital among various projects. Naturally, the 'best' or optimal project should have the lowest cost and the highest benefit. In the context of risk-informed decision making (RIDM), a process that has been widely embraced by the global nuclear community, the costs and benefits must further be 'weighted' by probabilities to estimate the underlying risk associated with the various planning alternatives. The main purpose of this study is to illustrate how risk and reliability information can be integrated into the refurbishment planning process to facilitate more objective and transparent investment decisions. The methodology is based on the concept of generation risk assessment (GRA) which provides a systematic approach for balancing investment costs with the reduction in overall financial risk. In addition to reliability predictions, the model provides estimates for the level of risk reduction associated with each system/project and also the break-even point for investment. This information is vital for project ranking, and helps to address the key question of whether capital investment should be made in the most risk critical systems, or in systems that reduce the overall risk the most. The application of the proposed methodology requires only basic information regarding the current reliability of each engineering system, which should be readily available from plant records and routine condition assessments. Because the methodology can be readily implemented in a Microsoft Excel spreadsheet, all plausible (e.g., bounding) planning scenarios, with or without investment, can also be generated quickly and easily, while

  17. Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process

    Science.gov (United States)

    Ray, Paul S.

    2002-01-01

    Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.

  18. Consideration of Risk in PPP-Projects

    Directory of Open Access Journals (Sweden)

    Josef Zimmermann

    2014-06-01

    Full Text Available Risk management has become a core competence for companies operating in construction services. In particular regarding Real Estate Development and Construction Management the fundamental knowledge and the dedicated ap- plication of risk assessment turn out to be critical. Construction Management deals with a multitude of local and temporal issues which are unknown or only given by statistical evaluation while conducting a unique construction project within a very tight frame of budget and time. Real Estate projects focus on the predictability of profitable operation for a fairly long period in advance and are therefore subject to many more and more voluminous uncertainties. With PPP-projects a more or less complete federal task is awarded to a private company. Its extent varies but com- prises at least design, construction and operation of a real estate project, e.g. a toll road, bridge, tunnel or other infrastructural object. Durations of such contracts of- ten extend to some 20 to 30 years. In this article the applicability of traditional means of risk management is inves- tigated for the use on PPP-projects and limits of risk consequences are pointed out. Finally we come to the conclusion, that the resulting unavertable risks tend to exceed every surcharge that could be successfully placed on a market.

  19. Assessing reservoir operations risk under climate change

    Science.gov (United States)

    Brekke, L.D.; Maurer, E.P.; Anderson, J.D.; Dettinger, M.D.; Townsley, E.S.; Harrison, A.; Pruitt, T.

    2009-01-01

    Risk-based planning offers a robust way to identify strategies that permit adaptive water resources management under climate change. This paper presents a flexible methodology for conducting climate change risk assessments involving reservoir operations. Decision makers can apply this methodology to their systems by selecting future periods and risk metrics relevant to their planning questions and by collectively evaluating system impacts relative to an ensemble of climate projection scenarios (weighted or not). This paper shows multiple applications of this methodology in a case study involving California's Central Valley Project and State Water Project systems. Multiple applications were conducted to show how choices made in conducting the risk assessment, choices known as analytical design decisions, can affect assessed risk. Specifically, risk was reanalyzed for every choice combination of two design decisions: (1) whether to assume climate change will influence flood-control constraints on water supply operations (and how), and (2) whether to weight climate change scenarios (and how). Results show that assessed risk would motivate different planning pathways depending on decision-maker attitudes toward risk (e.g., risk neutral versus risk averse). Results also show that assessed risk at a given risk attitude is sensitive to the analytical design choices listed above, with the choice of whether to adjust flood-control rules under climate change having considerably more influence than the choice on whether to weight climate scenarios. Copyright 2009 by the American Geophysical Union.

  20. PRA (Probabilistic Risk Assessments) Participation versus Validation

    Science.gov (United States)

    DeMott, Diana; Banke, Richard

    2013-01-01

    Probabilistic Risk Assessments (PRAs) are performed for projects or programs where the consequences of failure are highly undesirable. PRAs primarily address the level of risk those projects or programs posed during operations. PRAs are often developed after the design has been completed. Design and operational details used to develop models include approved and accepted design information regarding equipment, components, systems and failure data. This methodology basically validates the risk parameters of the project or system design. For high risk or high dollar projects, using PRA methodologies during the design process provides new opportunities to influence the design early in the project life cycle to identify, eliminate or mitigate potential risks. Identifying risk drivers before the design has been set allows the design engineers to understand the inherent risk of their current design and consider potential risk mitigation changes. This can become an iterative process where the PRA model can be used to determine if the mitigation technique is effective in reducing risk. This can result in more efficient and cost effective design changes. PRA methodology can be used to assess the risk of design alternatives and can demonstrate how major design changes or program modifications impact the overall program or project risk. PRA has been used for the last two decades to validate risk predictions and acceptability. Providing risk information which can positively influence final system and equipment design the PRA tool can also participate in design development, providing a safe and cost effective product.

  1. Risk Management on the National Compact Stellarator Project (NCSX)

    International Nuclear Information System (INIS)

    Simmons, Robert T.; Heitzenroeder, Philip J.; Reiersen, Wayne T.; Neilson, George H.; Strykowsky, Ronald L.; Rej, Donald; Gruber, Christopher O.

    2009-01-01

    In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a 'first-of-a-kind' fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project

  2. Evaluation of a constipation risk assessment scale.

    Science.gov (United States)

    Zernike, W; Henderson, A

    1999-06-01

    This project was undertaken in order to evaluate the utility of a constipation risk assessment scale and the accompanying bowel management protocol. The risk assessment scale was primarily introduced to teach and guide staff in managing constipation when caring for patients. The intention of the project was to reduce the incidence of constipation in patients during their admission to hospital.

  3. Project assessment for construction of new nuclear facility

    International Nuclear Information System (INIS)

    2013-01-01

    Project risk management is an important and integral part of project and quality management. It is also a key part of the due diligence process in making informed project decisions where in addition to the qualitative assessments quantitative ones shall be used to the extend practical. As part of the risk management process, risk identification, evaluation and mitigation must be an on-going activity at senior management levels throughout the planning, design, construction and commissioning phases of a new NPP

  4. On Best Practices for Risk Management in Complex Projects

    Directory of Open Access Journals (Sweden)

    Dan BENTA

    2011-01-01

    Full Text Available Risk management shall be proactive. This is one of the key preliminaries to cope with the challenges of complex projects. An overarching and consistent view on project risks and uncertainties is necessary to follow a holistic approach in project risk management. Uncertainty is inevitable since projects are unique and temporary undertakings based on assumptions and constraints, delivering project results to multiple stakeholders with different requirements. Project management can be seen as an attempt to control this uncertain environment, through the use of structured and disciplined techniques such as estimating, planning, cost control, task allocation, earned value analysis, monitoring, and review meetings. Each of these elements of project management has a role in defining or controlling inherent variability in projects. Project risk management provides approaches by which uncertainty can be understood, assessed, and managed within projects. A number of associations (e.g., Project Management Institute – PMI®, International Project Management Association – IPMA,or Network of Nordic Project Management Associations - NORDNET work constantly in acquiring, improving, and standardizing best practices in project management.Based on the industrial practice, this paper outlines strategies to identify, prioritize, and mitigate risks for achievement of project’ or organizational objectives.

  5. Construction scheduled delay risk assessment by using combined AHP-RII methodology for an international NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Hossen, Mufazal Muhammed; Kang, Sun Koo; Kim, Jong Hyun [KEPCO International Nuclear Graduate School (KINGS), Ulsan (Korea, Republic of)

    2015-04-15

    In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

  6. Construction scheduled delay risk assessment by using combined AHP-RII methodology for an international NPP project

    International Nuclear Information System (INIS)

    Hossen, Mufazal Muhammed; Kang, Sun Koo; Kim, Jong Hyun

    2015-01-01

    In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs

  7. Risk assessment and risk management in managed aquifer recharge

    CSIR Research Space (South Africa)

    Page, D

    2012-06-01

    Full Text Available This chapter presents the methodologies used for risk assessment and risk management in MAR in Australia and the European Union, qualitative and quantitative approaches adopted within the RECLAIM Water project and case studies where the outcomes...

  8. Risk Assessment for an Unmanned Merchant Ship

    Directory of Open Access Journals (Sweden)

    Ø.J. Rødseth

    2015-09-01

    Full Text Available The MUNIN project is doing a feasibility study on an unmanned bulk carrier on an intercontinental voyage. To develop the technical and operational concepts, MUNIN has used a risk-based design method, based on the Formal Safety Analysis method which is also recommended by the International Mari-time Organization. Scenario analysis has been used to identify risks and to simplify operational scope. Systematic hazard identification has been used to find critical safety and security risks and how to address these. Technology and operational concept testing is using a hypothesis-based test method, where the hypotheses have been created as a result of the risk assessment. Finally, the cost-benefit assessment will also use results from the risk assessment. This paper describes the risk assessment method, some of the most important results and also describes how the results have been or will be used in the different parts of the project.

  9. Integrated climate change risk assessment:

    DEFF Research Database (Denmark)

    Kaspersen, Per Skougaard; Halsnæs, Kirsten

    2017-01-01

    Risk assessments of flooding in urban areas during extreme precipitation for use in, for example, decision-making regarding climate adaptation, are surrounded by great uncertainties stemming from climate model projections, methods of downscaling and the assumptions of socioeconomic impact models...... to address the complex linkages between the different kinds of data required in assessing climate adaptation. It emphasizes that the availability of spatially explicit data can reduce the overall uncertainty of the risk assessment and assist in identifying key vulnerable assets. The usefulness...... of such a framework is demonstrated by means of a risk assessment of flooding from extreme precipitation for the city of Odense, Denmark. A sensitivity analysis shows how the presence of particularly important assets, such as cultural and historical heritage, may be addressed in assessing such risks. The output...

  10. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  11. [Risk assessment and risk control for occupational exposure to chemical toxicants from an isophorone nitrile device].

    Science.gov (United States)

    Wang, Dejun; Fu, Xiaokuan; Kong, Fanling; Sui, Shaofeng; Jiang, Yuanyuan; Du, Yinglin; Zhou, Jingyang

    2014-06-01

    Risk assessment and risk control for occupational exposure to chemical toxicants were performed on an isophorone nitrile device with an annual production of 5,000 tons, based on improved Singaporean semi-quantitative risk assessment method, with consideration of actual situation in China and in the present project. With the use of engineering analysis and identification of occupational hazards in the improved Singaporean semi-quantitative risk assessment method, hazard rating (HR) and risk assessment were performed on chemical toxicants from an isophorone nitrile device with an annual production of 5,000 tons. The chemical toxicants in the isophorone nitrile device were mainly isophorone, hydrocyanic acid, methanol, phosphoric acid, sodium hydroxide, and sodium cyanide; the HR values were mild hazard (2), extreme hazard (5), mild hazard (2), mild hazard (2), moderate hazard (3), and extreme hazard (5), respectively, and the corresponding exposure rating (ER) values were 2.09, 2.72, 2.76, 1.68, 2.0, and 1.59, respectively. The risk of chemical toxicants in this project was assessed according to the formula Risk = [HR×ER](1/2). Hydrocyanic acid was determined as high risk, sodium hydroxide and sodium cyanide as medium risk, and isophorone, methanol, and phosphoric acid as low risk. Priority in handling of risks was determined by risk rating. The table of risk control measure was established for pre-assessment of occupational hazards. With risk assessment in this study, we concluded that the isophorone nitrile device with 5,000 ton annual production was a high-occupational hazard device. This device is a project of extreme occupational hazard. The improved Singaporean semi-quantitative risk assessment method is a scientific and applicable method, and is especially suitable for pre-evaluation of on-site project with no analogy.

  12. Colon Cancer Risk Assessment - Gauss Program

    Science.gov (United States)

    An executable file (in GAUSS) that projects absolute colon cancer risk (with confidence intervals) according to NCI’s Colorectal Cancer Risk Assessment Tool (CCRAT) algorithm. GAUSS is not needed to run the program.

  13. Risk assessment guidance document for the UMTRA project groundwater remediation phase

    International Nuclear Information System (INIS)

    1992-05-01

    The purpose of the groundwater remedial activities at the Uranium Mill Tailings Remedial Action (UMTRA) sites is to reduce, control, or eliminate risks to human health and the environment. This is in accordance with Subpart B of 40 CFR 192. According to this regulation, the need for groundwater restoration is based upon US Environmental Protection Agency (EPA)-defined groundwater cleanup standards and must be consistent with the National Environmental Policy Act (NEPA) process. Risk assessments will be used in the UMTRA Groundwater Program to aid in the evaluation of sites. Risk assessments are conducted for four purposes: (1) Preliminary risk assessments are used to aid in prioritizing sites, scope data collection, end determine if a site presents immediate health risks. (2) Baseline risk assessments provide a comprehensive integration and interpretation of demographic, geographic, physical, chemical, and biological factors at a site to determine the extent of actual or potential harm. This information Is used to determine the need for remedial action. (3) Risk evaluation of remedial alternatives is performed to evaluate risks to humans or the environment associated with the various remedial strategies. (4) After remediation, an evaluation of residual risks is conducted. The information gathered for each of these risk evaluations is used to determine the need for subsequent evaluation. Several sites may be eliminated after a preliminary risk assessment if there is no current or future threat to humans or the environment. Likewise, much of the data from a baseline risk assessment can be used to support alternate concentration limits or supplemental standards demonstrations, or identify sensitive habitats or receptors that may be of concern in selecting a remedy

  14. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  15. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  16. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C. (Brookhaven National Lab., Upton, NY (United States)); Anspaugh, L.; Layton, D. (Lawrence Livermore National Lab., CA (United States))

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.

  17. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C.; Anspaugh, L.; Layton, D.

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated

  18. ANALYSIS OF ECONOMIC RISK IN EUROPEAN INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Margareta Stela FLORESCU

    2012-06-01

    Full Text Available Risk is a reality of the economic environment, with consequences which cannot always be foreseen or anticipated. Risk management becomes more stringent as potential exo/endogenous vulnerability factors are rapidly increasing. Identifying risk areas, structuring risk factors and defining their probability, optimal management of resources in order to reduce risk factors, creating alternatives for each high-probability risk factor are part of project risk management. Risk is quantified through probability and incidence and is assessed using quantitative and qualitative methods.

  19. The use of comparative risk assessment in decision making

    International Nuclear Information System (INIS)

    Chicken, J.C.; Hayns, M.R.; Tolley, B.

    1989-01-01

    This paper justifies: 1) Comparative risk assessment provides a way of establishing whether or not the risks associated with a novel proposal are likely to satisfy current norms. 2) Comparative risk assessment is an aid to decision making when for some reason there is inadequate quantitative data about the risks associated with a project. 3) One problem is that there is no single universally acceptable norm. Norms vary both with time and from activity to activity. The spread of acceptable norms spans at least two orders of magnitude. 4) For any comparative risk assessment to be considered more than a suggestion on how acceptable a risk is, the risks that are compared must be similar and located in similar cultural and geographical environments. 5) Ulitmately justification of the acceptability of a project must be based on data generated directly by the project itself and any opinion based on comparative evidence must be iteratively revised as direct hard evidence becomes available. 6) Comparative risk assessment has a useful role in presentations to the lay public about the acceptability of a particular risk. 7) There may be more problems in making a comparative assessment of risk acceptability in socio-political terms than in technical or economic terms. The central requirement that the comparison must be based on data from similar cultural backgrounds is often hard to satisfy in relation to socio-political considerations

  20. A Successful ED Fall Risk Program Using the KINDER 1 Fall RiskAssessment Tool.

    Science.gov (United States)

    Townsend, Ann B; Valle-Ortiz, Marisol; Sansweet, Tracy

    2016-11-01

    Emergency nurses did not perform falls risk assessments routinely on our ED patients; the instrument used was aimed at inpatients. We identified a need to revise fall assessment practices specific to our emergency department. The purpose of the performance improvement project was to reduce ED falls and evaluate the use of an ED-specific fall risk tool, the KINDER 1 Fall Risk Assessment. The plan was to establish fall risk assessment practices at point of ED entry and to decrease total falls. We retrospectively reviewed ED fall data for each quarter of 2013, which included risk assessments scores, the total number of falls, and the circumstances of each fall. Using Kotter's framework to guide a successful change process, we implemented the KINDER 1 to assess fall risk. During the first 4 weeks of the project, 937 patients (27%) were identified as high risk for falls using the KINDER 1. During the subsequent 3 quarters, the total number of falls decreased; reported falls without injuries dropped from 0.21 to 0.07 per 1000 patients, and falls with injuries were reduced from 0.21 to 0.0 per 1000 patients. The results of this project represented a valuable step toward achieving our goal to keep ED patients safe from injuries as a result of falls. The findings add to the body of nursing knowledge on the application of clinical-based performance improvement projects to improve patient outcomes and to provide data on the use of the KINDER 1 tool, which has not been extensively tested. Copyright © 2016 Emergency Nurses Association. Published by Elsevier Inc. All rights reserved.

  1. The ChimERA project: Coupling mechanistic exposure and effect models into an integrated platform for ecological risk assessment

    NARCIS (Netherlands)

    Laender, de F.; Brink, van den P.J.; Janssen, C.R.; Guardo, Di A.

    2014-01-01

    Current techniques for the ecological risk assessment of chemical substances are often criticised for their lack of environmental realism, ecological relevance and methodological accuracy. ChimERA is a 3-year project (2013-2016), funded by Cefic's Long Range Initiative (LRI) that aims to address

  2. THE RISKS’ ASSESSMENT IN INNOVATIVE PROJECTS BY THE METHOD OF VERIFIED EQUIVALENTS

    Directory of Open Access Journals (Sweden)

    Анатолій Валентинович ШАХОВ

    2017-03-01

    Full Text Available The article describes the concept of "risk of innovation", identified the causes of the risk and the methods of eliminating of negative manifestations of the risk situations in innovative projects. The advantages and disadvantages of the method of correction of the discount rate and the method of equivalent annuities are considered. The methodical approach in assessing the expected effect of the innovative project based on the concept of probability-interval uncertainty is proposed in the article. It was established that the analyzed approaches can be used for the accounting of the risk of innovative projects. Project manager makes his choice using any method of risk assessment individually, depending on the extent and characteristics of the project, the degree of novelty and scale introduction of innovative products, the number of participants and the level of requirements of the foundation of project efficiency and other factors.

  3. Assessing forest influences on torrential hazards and risks: IRSTEA mission within the European H2020 project NAIAD

    Science.gov (United States)

    Piton, Guillaume; Tacnet, Jean Marc; Berger, Frédéric; Curt, Corinne; Curt, Thomas; Arnaud, Patrick

    2017-04-01

    NAIAD (NAture Insurance value: Assessment and Demonstration) is a H2020 European project gathering 23 partners interested in ecosystems services related to water. The project more specifically links nature services to the assurance world and aims to operationalise "Natural Assurance Schemes", defined as a range of schemes to internalise the value of ecosystems services, e.g., the buffering role of river systems against water risks, in insurance policies. It is based on an assessment methodology that includes the physical, socio-cultural and valuation aspects of ecosystems services in relation to water, adapted to the institutional frame to align economic incentives and financial flows. Within the NAIAD projet, IRSTEA will more specifically try to highlight the role of mountain forests in torrential flood hazards and risks. The forest eventually acts on hydrology by buffering part of the rainwater. Vegetation has also a key role in soil conservation by curtailing primary sediment production in the hillslopes. Conversely, woody debris dramatically aggravate hazards by clogging bridges and key protections structures as open check dams. Finally this dual role may change in time due to the forest vulnerability to climatic, biologic or physical changes, e.g. after a wildfire. The first project step will be an extensive literature review on all these effects. Secondly indicators describing the torrential systems will be proposed and link to variably pronounced influence of forest. In a third time, case studies will be undertaken. The dramatic flood that occur in the region of Nice in summer 2015 (20 fatalities) will probably be used as a benchmark test. Several scenarios of alternative forest and river managements under varying climate forcing will be tested later. Complete torrential risk assessment studies will be performed on several sites within this project, with and without the forest influences in order to highlight its role. Numerous check dams have been built in

  4. Risk assessment in energy efficiency projects; Gerenciamento de riscos em projetos de eficiencia energetica

    Energy Technology Data Exchange (ETDEWEB)

    Aragao Neto, Raymundo Moniz de

    2003-08-15

    This paper aims to present processes related to risk management in energy efficiency projects, delivered in a performance contracting basis. Introductory comments will be presented about the considered project model, emphasizing the necessity of proper processes of risk management and evaluation and their treatment according methodology developed by PMI - Project Management Institute, grouped in its publication PMBOK - Project Management Body of Knowledge. A hypothetical project will be demonstrated, but similar to the Brazilian Body of Knowledge. A hypothetical project will be demonstrated, but similar to the Brazilian market reality, as a form of illustrating the considered methodology.

  5. The Ohio River Valley CO2 Storage Project AEP Mountaineer Plant, West Virginia Numerical Simulation and Risk Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    Neeraj Gupta

    2008-03-31

    A series of numerical simulations of carbon dioxide (CO{sub 2}) injection were conducted as part of a program to assess the potential for geologic sequestration in deep geologic reservoirs (the Rose Run and Copper Ridge formations), at the American Electric Power (AEP) Mountaineer Power Plant outside of New Haven, West Virginia. The simulations were executed using the H{sub 2}O-CO{sub 2}-NaCl operational mode of the Subsurface Transport Over Multiple Phases (STOMP) simulator (White and Oostrom, 2006). The objective of the Rose Run formation modeling was to predict CO{sub 2} injection rates using data from the core analysis conducted on the samples. A systematic screening procedure was applied to the Ohio River Valley CO{sub 2} storage site utilizing the Features, Elements, and Processes (FEP) database for geological storage of CO{sub 2} (Savage et al., 2004). The objective of the screening was to identify potential risk categories for the long-term geological storage of CO{sub 2} at the Mountaineer Power Plant in New Haven, West Virginia. Over 130 FEPs in seven main classes were assessed for the project based on site characterization information gathered in a geological background study, testing in a deep well drilled on the site, and general site conditions. In evaluating the database, it was apparent that many of the items were not applicable to the Mountaineer site based its geologic framework and environmental setting. Nine FEPs were identified for further consideration for the site. These FEPs generally fell into categories related to variations in subsurface geology, well completion materials, and the behavior of CO{sub 2} in the subsurface. Results from the screening were used to provide guidance on injection system design, developing a monitoring program, performing reservoir simulations, and other risk assessment efforts. Initial work indicates that the significant FEPs may be accounted for by focusing the storage program on these potential issues. The

  6. Hanford Waste Vitrification Project Building limited scope risk assessment

    International Nuclear Information System (INIS)

    Braun, D.J.; Lindberg, S.E.; Reardon, M.F.; Wilson, G.P.

    1992-10-01

    A limited scope risk assessment was performed on the preliminary design of a high-level waste interim storage facility. The Canister Storage Building (CSB) facility will be built to support remediation at the US Department of Energy Hanford Site in Washington State. The CSB will be part of the support facilities for a high level Hanford Waste Vitrification Plant (HWVP). The limited scope risk assessment is based on a preliminary design which uses forced air circulation systems to move air through the building vault. The current building design calls for natural circulation to move air through the building vault

  7. Reference Scenario Forecasting: A New Approach to Transport Project Assessment

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen; Skougaard, Britt Zoëga

    2010-01-01

    This paper presents a new approach to transport project assessment in terms of feasibility risk assessment and reference class forecasting. Normally, transport project assessment is based upon a cost-benefit approach where evaluation criteria such as net present values are obtained. Recent research...... construction cost estimates. Hereafter, a quantitative risk analysis is provided making use of Monte Carlo simulation. This stochastic approach facilitates random input parameters based upon reference class forecasting, hence, a parameter data fit has been performed in order to obtain validated probability...... forecasting (RSF) frame. The RSF is anchored in the cost-benefit analysis (CBA), thus, it provides decision-makers with a quantitative mean of assessing the transport infrastructure project. First, the RSF method introduces uncertainties within the CBA by applying Optimism Bias uplifts on the preliminary...

  8. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    International Nuclear Information System (INIS)

    Collins, John W.

    2011-01-01

    Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap

  9. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    Energy Technology Data Exchange (ETDEWEB)

    John W. Collins

    2011-09-01

    Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap

  10. GAR Global Risk Assessment

    Science.gov (United States)

    Maskrey, Andrew; Safaie, Sahar

    2015-04-01

    Disaster risk management strategies, policies and actions need to be based on evidence of current disaster loss and risk patterns, past trends and future projections, and underlying risk factors. Faced with competing demands for resources, at any level it is only possible to priorities a range of disaster risk management strategies and investments with adequate understanding of realised losses, current and future risk levels and impacts on economic growth and social wellbeing as well as cost and impact of the strategy. The mapping and understanding of the global risk landscape has been greatly enhanced by the latest iteration of the GAR Global Risk Assessment and the objective of this submission is to present the GAR global risk assessment which contributed to Global Assessment Report (GAR) 2015. This initiative which has been led by UNISDR, was conducted by a consortium of technical institutions from around the world and has covered earthquake, cyclone, riverine flood, and tsunami probabilistic risk for all countries of the world. In addition, the risks associated with volcanic ash in the Asia-Pacific region, drought in various countries in sub-Saharan Africa and climate change in a number of countries have been calculated. The presentation will share thee results as well as the experience including the challenges faced in technical elements as well as the process and recommendations for the future of such endeavour.

  11. Assessment of health risks of policies

    International Nuclear Information System (INIS)

    Ádám, Balázs; Molnár, Ágnes; Ádány, Róza; Bianchi, Fabrizio; Bitenc, Katarina; Chereches, Razvan; Cori, Liliana; Fehr, Rainer; Kobza, Joanna; Kollarova, Jana

    2014-01-01

    The assessment of health risks of policies is an inevitable, although challenging prerequisite for the inclusion of health considerations in political decision making. The aim of our project was to develop a so far missing methodological guide for the assessment of the complex impact structure of policies. The guide was developed in a consensual way based on experiences gathered during the assessment of specific national policies selected by the partners of an EU project. Methodological considerations were discussed and summarized in workshops and pilot tested on the EU Health Strategy for finalization. The combined tool, which includes a textual guidance and a checklist, follows the top-down approach, that is, it guides the analysis of causal chains from the policy through related health determinants and risk factors to health outcomes. The tool discusses the most important practical issues of assessment by impact level. It emphasises the transparent identification and prioritisation of factors, the consideration of the feasibility of exposure and outcome assessment with special focus on quantification. The developed guide provides useful methodological instructions for the comprehensive assessment of health risks of policies that can be effectively used in the health impact assessment of policy proposals. - Highlights: • Methodological guide for the assessment of health risks of policies is introduced. • The tool is developed based on the experiences from several case studies. • The combined tool consists of a textual guidance and a checklist. • The top-down approach is followed through the levels of the full impact chain. • The guide provides assistance for the health impact assessment of policy proposals

  12. Assessment of health risks of policies

    Energy Technology Data Exchange (ETDEWEB)

    Ádám, Balázs, E-mail: badam@cmss.sdu.dk [Unit for Health Promotion Research, Faculty of Health Sciences, University of Southern Denmark, Niels Bohrs Vej 9, DK-6700 Esbjerg (Denmark); Department of Preventive Medicine, Faculty of Public Health, University of Debrecen, P.O. Box 9, H-4012 Debrecen (Hungary); Molnár, Ágnes, E-mail: MolnarAg@smh.ca [Department of Preventive Medicine, Faculty of Public Health, University of Debrecen, P.O. Box 9, H-4012 Debrecen (Hungary); Centre for Research on Inner City Health, Keenan Research Centre, Li Ka Shing Knowledge Institute, St Michael' s Hospital, Victoria 209, Rm. 3-26.22, M5B 1C6 Toronto, Ontario (Canada); Ádány, Róza, E-mail: adany.roza@sph.unideb.hu [Department of Preventive Medicine, Faculty of Public Health, University of Debrecen, P.O. Box 9, H-4012 Debrecen (Hungary); Bianchi, Fabrizio, E-mail: Fabriepi@ifc.cnr.it [Unit of Environmental Epidemiology, Institute of Clinical Physiology, National Council of Research, Moruzzi 1, 56124 Pisa (Italy); Bitenc, Katarina, E-mail: katarina.bitenc@ivz-rs.si [National Institute of Public Health, Trubarjeva 2, SI-1000 Ljubljana (Slovenia); Chereches, Razvan, E-mail: razvan.m.chereches@gmail.com [Faculty of Political, Administrative and Communication Sciences, Babes-Bolyai University, Strada Mihail Kogalniceanu 1, 3400 Cluj (Romania); Cori, Liliana, E-mail: liliana.cori@ifc.cnr.it [Unit of Environmental Epidemiology, Institute of Clinical Physiology, National Council of Research, Moruzzi 1, 56124 Pisa (Italy); Fehr, Rainer, E-mail: rainer.fehr@uni-bielefeld.de [NRW Centre for Health, Westerfeldstr. 35-37, 33611 Bielefeld (Germany); Kobza, Joanna, E-mail: koga1@poczta.onet.pl [Public Health Department, Silesian Medical University, 18 Medykow Street, 40-752 Katowice (Poland); Kollarova, Jana, E-mail: janakollarova@yahoo.com [Department of Health Promotion, Regional Public Health Authority, Ipelska 1, 04011 Kosice (Slovakia); and others

    2014-09-15

    The assessment of health risks of policies is an inevitable, although challenging prerequisite for the inclusion of health considerations in political decision making. The aim of our project was to develop a so far missing methodological guide for the assessment of the complex impact structure of policies. The guide was developed in a consensual way based on experiences gathered during the assessment of specific national policies selected by the partners of an EU project. Methodological considerations were discussed and summarized in workshops and pilot tested on the EU Health Strategy for finalization. The combined tool, which includes a textual guidance and a checklist, follows the top-down approach, that is, it guides the analysis of causal chains from the policy through related health determinants and risk factors to health outcomes. The tool discusses the most important practical issues of assessment by impact level. It emphasises the transparent identification and prioritisation of factors, the consideration of the feasibility of exposure and outcome assessment with special focus on quantification. The developed guide provides useful methodological instructions for the comprehensive assessment of health risks of policies that can be effectively used in the health impact assessment of policy proposals. - Highlights: • Methodological guide for the assessment of health risks of policies is introduced. • The tool is developed based on the experiences from several case studies. • The combined tool consists of a textual guidance and a checklist. • The top-down approach is followed through the levels of the full impact chain. • The guide provides assistance for the health impact assessment of policy proposals.

  13. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  14. Assessing drought risk under climate change in the US Great Plains via evaporative demand from downscaled GCM projections

    Science.gov (United States)

    Dewes, C.; Rangwala, I.; Hobbins, M.; Barsugli, J. J.

    2016-12-01

    Drought conditions in the US Great Plains occur primarily in response to periods of low precipitation, but they can be exacerbated by enhanced evaporative demand (E0) during periods of elevated temperatures, radiation, advection, and/or decreased humidity. A number of studies project severe to unprecedented drought conditions for this region later in the 21st century. Yet, we have found that methodological choices in the estimation of E0 and the selection of global climate model (GCM) output account for large uncertainties in projections of drought risk. Furthermore, the coarse resolution of GCMs offers little usability for drought risk assessments applied to socio-ecological systems, and users of climate data for that purpose tend to prefer existing downscaled products. Here we derive a physically based estimation of E0 - the FAO56 Penman-Monteith reference evapotranspiration - using driving variables from the Multivariate Adaptive Constructed Analogs (MACA) dataset, which have a spatial resolution of approximately 4 km. We select downscaled outputs from five CMIP5 GCMs, whereby we aim to represent different scenarios for the future of the Great Plains region (e.g. warm/wet, hot/dry, etc.). While this downscaling methodology removes GCM bias relative to a gridded product for historical data (METDATA), we first examine the remaining bias relative to ground (point) estimates of E0. Next we assess whether the downscaled products preserve the variability of their parent GCMs, in both historical and future (RCP8.5) projections. We then use the E0 estimates to compute multi-scale time series of drought indices such as the Evaporative Demand Drought Index (EDDI) and the Standardized Precipitation-Evaporation Index (SPEI) over the Great Plains region. We also attribute variability and drought anomalies to each of the driving parameters, to tease out the influence of specific model biases and evaluate geographical nuances of E0 drivers. Aside from improved understanding of

  15. Environmental Risk Assessment of Genetically Modified Organisms (GMOs)

    DEFF Research Database (Denmark)

    Strandberg, B.; Kjær, C.; Hindar, K.

    It was the aim of this NordTest project to propose improvements that prepare us to assess ecological risks to the environment associated with releases of existing and coming GMO cases. The report is separated into three sections. The first describes the frames of ecological risk assessment...

  16. The ARGO Project: assessing NA-TECH risks on off-shore oil platforms

    Science.gov (United States)

    Capuano, Paolo; Basco, Anna; Di Ruocco, Angela; Esposito, Simona; Fusco, Giannetta; Garcia-Aristizabal, Alexander; Mercogliano, Paola; Salzano, Ernesto; Solaro, Giuseppe; Teofilo, Gianvito; Scandone, Paolo; Gasparini, Paolo

    2017-04-01

    ARGO (Analysis of natural and anthropogenic risks on off-shore oil platforms) is a 2 years project, funded by the DGS-UNMIG (Directorate General for Safety of Mining and Energy Activities - National Mining Office for Hydrocarbons and Georesources) of Italian Ministry of Economic Development. The project, coordinated by AMRA (Center for the Analysis and Monitoring of Environmental Risk), aims at providing technical support for the analysis of natural and anthropogenic risks on offshore oil platforms. In order to achieve this challenging objective, ARGO brings together climate experts, risk management experts, seismologists, geologists, chemical engineers, earth and coastal observation experts. ARGO has developed methodologies for the probabilistic analysis of industrial accidents triggered by natural events (NA-TECH) on offshore oil platforms in the Italian seas, including extreme events related to climate changes. Furthermore the environmental effect of offshore activities has been investigated, including: changes on seismicity and on the evolution of coastal areas close to offshore platforms. Then a probabilistic multi-risk framework has been developed for the analysis of NA-TECH events on offshore installations for hydrocarbon extraction.

  17. Risk assessment - black art or science?

    International Nuclear Information System (INIS)

    Moore, G.

    1988-01-01

    Measures of risk can be divided into two categories, those that observe or calculate the risk of a process or project, and those that rely on the level of risk as perceived by the people during the assessment. Collection of data of accidents (where cause and effect are obvious) and experiments on animals which can then be extrapolated to humans, are two ways of risk assessment. Mathematical models and computerized simulations, using either fault tree analysis or Monte Carlo methods are explained simply. Using these methods, experts are able to perceive risk fairly realistically. However, the general public's perception of risk is often quite different, as potential risk is assessed in different ways. The concept of tolerable risk is considered, particularly with reference to nuclear reactors such as Sizewell-B. The need to inform the public of safeguards and safety procedures so they have a better understanding of the risks of nuclear power is stressed. (U.K.)

  18. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  19. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  20. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  1. Screening Assessment of Potential Human-Health Risk from Future Natural-Gas Drilling Near Project Rulison in Western Colorado

    Energy Technology Data Exchange (ETDEWEB)

    Daniels Jeffrey I.,Chapman Jenny B.

    2012-01-01

    The Project Rulison underground nuclear test was conducted in 1969 at a depth of 8,400 ft in the Williams Fork Formation of the Piceance Basin, west-central Colorado (Figure 1). The U.S. Department of Energy Office of Legacy Management (LM) is the steward of the site. Their management is guided by data collected from past site investigations and current monitoring, and by the results of calculations of expected behavior of contaminants remaining in the deep subsurface. The purpose of this screening risk assessment is to evaluate possible health risks from current and future exposure to Rulison contaminants so the information can be factored into LM's stewardship decisions. For example, these risk assessment results can inform decisions regarding institutional controls at the site and appropriate monitoring of nearby natural-gas extraction activities. Specifically, the screening risk analysis can provide guidance for setting appropriate action levels for contaminant monitoring to ensure protection of human health.

  2. Screening Assessment of Potential Human-Health Risk from Future Natural-Gas Drilling Near Project Rulison in Western Colorado

    International Nuclear Information System (INIS)

    Daniels, Jeffrey I.; Chapman, Jenny B.

    2012-01-01

    The Project Rulison underground nuclear test was conducted in 1969 at a depth of 8,400 ft in the Williams Fork Formation of the Piceance Basin, west-central Colorado (Figure 1). The U.S. Department of Energy Office of Legacy Management (LM) is the steward of the site. Their management is guided by data collected from past site investigations and current monitoring, and by the results of calculations of expected behavior of contaminants remaining in the deep subsurface. The purpose of this screening risk assessment is to evaluate possible health risks from current and future exposure to Rulison contaminants so the information can be factored into LM's stewardship decisions. For example, these risk assessment results can inform decisions regarding institutional controls at the site and appropriate monitoring of nearby natural-gas extraction activities. Specifically, the screening risk analysis can provide guidance for setting appropriate action levels for contaminant monitoring to ensure protection of human health.

  3. Comparison of additive (absolute) risk projection models and multiplicative (relative) risk projection models in estimating radiation-induced lifetime cancer risk

    International Nuclear Information System (INIS)

    Kai, Michiaki; Kusama, Tomoko

    1990-01-01

    Lifetime cancer risk estimates depend on risk projection models. While the increasing lengths of follow-up observation periods of atomic bomb survivors in Hiroshima and Nagasaki bring about changes in cancer risk estimates, the validity of the two risk projection models, the additive risk projection model (AR) and multiplicative risk projection model (MR), comes into question. This paper compares the lifetime risk or loss of life-expectancy between the two projection models on the basis of BEIR-III report or recently published RERF report. With Japanese cancer statistics the estimates of MR were greater than those of AR, but a reversal of these results was seen when the cancer hazard function for India was used. When we investigated the validity of the two projection models using epidemiological human data and animal data, the results suggested that MR was superior to AR with respect to temporal change, but there was little evidence to support its validity. (author)

  4. Advanced Test Reactor outage risk assessment

    International Nuclear Information System (INIS)

    Thatcher, T.A.; Atkinson, S.A.

    1997-01-01

    Beginning in 1997, risk assessment was performed for each Advanced Test Reactor (ATR) outage aiding the coordination of plant configuration and work activities (maintenance, construction projects, etc.) to minimize the risk of reactor fuel damage and to improve defense-in-depth. The risk assessment activities move beyond simply meeting Technical Safety Requirements to increase the awareness of risk sensitive configurations, to focus increased attention on the higher risk activities, and to seek cost-effective design or operational changes that reduce risk. A detailed probabilistic risk assessment (PRA) had been performed to assess the risk of fuel damage during shutdown operations including heavy load handling. This resulted in several design changes to improve safety; however, evaluation of individual outages had not been performed previously and many risk insights were not being utilized in outage planning. The shutdown PRA provided the necessary framework for assessing relative and absolute risk levels and assessing defense-in-depth. Guidelines were written identifying combinations of equipment outages to avoid. Screening criteria were developed for the selection of work activities to receive review. Tabulation of inherent and work-related initiating events and their relative risk level versus plant mode has aided identification of the risk level the scheduled work involves. Preoutage reviews are conducted and post-outage risk assessment is documented to summarize the positive and negative aspects of the outage with regard to risk. The risk for the outage is compared to the risk level that would result from optimal scheduling of the work to be performed and to baseline or average past performance

  5. Assessment of the Appalachian Basin Geothermal Field: Combining Risk Factors to Inform Development of Low Temperature Projects

    Science.gov (United States)

    Smith, J. D.; Whealton, C.; Camp, E. R.; Horowitz, F.; Frone, Z. S.; Jordan, T. E.; Stedinger, J. R.

    2015-12-01

    Exploration methods for deep geothermal energy projects must primarily consider whether or not a location has favorable thermal resources. Even where the thermal field is favorable, other factors may impede project development and success. A combined analysis of these factors and their uncertainty is a strategy for moving geothermal energy proposals forward from the exploration phase at the scale of a basin to the scale of a project, and further to design of geothermal systems. For a Department of Energy Geothermal Play Fairway Analysis we assessed quality metrics, which we call risk factors, in the Appalachian Basin of New York, Pennsylvania, and West Virginia. These included 1) thermal field variability, 2) productivity of natural reservoirs from which to extract heat, 3) potential for induced seismicity, and 4) presence of thermal utilization centers. The thermal field was determined using a 1D heat flow model for 13,400 bottomhole temperatures (BHT) from oil and gas wells. Steps included the development of i) a set of corrections to BHT data and ii) depth models of conductivity stratigraphy at each borehole based on generalized stratigraphy that was verified for a select set of wells. Wells are control points in a spatial statistical analysis that resulted in maps of the predicted mean thermal field properties and of the standard error of the predicted mean. Seismic risk was analyzed by comparing earthquakes and stress orientations in the basin to gravity and magnetic potential field edges at depth. Major edges in the potential fields served as interpolation boundaries for the thermal maps (Figure 1). Natural reservoirs were identified from published studies, and productivity was determined based on the expected permeability and dimensions of each reservoir. Visualizing the natural reservoirs and population centers on a map of the thermal field communicates options for viable pilot sites and project designs (Figure 1). Furthermore, combining the four risk

  6. Development of Improved Caprock Integrity and Risk Assessment Techniques

    Energy Technology Data Exchange (ETDEWEB)

    Bruno, Michael [Geomechanics Technologies, Incorporated, Monrovia, CA (United States)

    2014-09-30

    GeoMechanics Technologies has completed a geomechanical caprock integrity analysis and risk assessment study funded through the US Department of Energy. The project included: a detailed review of historical caprock integrity problems experienced in the natural gas storage industry; a theoretical description and documentation of caprock integrity issues; advanced coupled transport flow modelling and geomechanical simulation of three large-scale potential geologic sequestration sites to estimate geomechanical effects from CO₂ injection; development of a quantitative risk and decision analysis tool to assess caprock integrity risks; and, ultimately the development of recommendations and guidelines for caprock characterization and CO₂ injection operating practices. Historical data from gas storage operations and CO₂ sequestration projects suggest that leakage and containment incident risks are on the order of 10-1 to 10-2, which is higher risk than some previous studies have suggested for CO₂. Geomechanical analysis, as described herein, can be applied to quantify risks and to provide operating guidelines to reduce risks. The risk assessment tool developed for this project has been applied to five areas: The Wilmington Graben offshore Southern California, Kevin Dome in Montana, the Louden Field in Illinois, the Sleipner CO₂ sequestration operation in the North Sea, and the In Salah CO₂ sequestration operation in North Africa. Of these five, the Wilmington Graben area represents the highest relative risk while the Kevin Dome area represents the lowest relative risk.

  7. Fuzzy net present valuation based on risk assessment of Malaysian infrastructure

    Science.gov (United States)

    Shaffie, Siti Salihah; Jaaman, Saiful Hafizah; Mohamad, Daud

    2017-04-01

    In recent years, built-operate-transfer (BOT) projects have profoundly been accepted under project financing for infrastructure developments in many countries. It requires high financing and involves complex mutual risk. The assessment of the risks is vital to avert huge financial loss. Net present value is widely applied to BOT project where the uncertainties in cash flows are deemed to be deterministic values. This study proposed a fuzzy net present value model taking consideration the assessment of risks from the BOT project. The proposed model is adopted to provide more flexible net present valuation of the project. It is shown and proven that the improved fuzzy cash flow model will provide a valuation that is closed to the real value of the project.

  8. Project Portfolio Risk Identification and Analysis, Considering Project Risk Interactions and Using Bayesian Networks

    Directory of Open Access Journals (Sweden)

    Foroogh Ghasemi

    2018-05-01

    Full Text Available An organization’s strategic objectives are accomplished through portfolios. However, the materialization of portfolio risks may affect a portfolio’s sustainable success and the achievement of those objectives. Moreover, project interdependencies and cause–effect relationships between risks create complexity for portfolio risk analysis. This paper presents a model using Bayesian network (BN methodology for modeling and analyzing portfolio risks. To develop this model, first, portfolio-level risks and risks caused by project interdependencies are identified. Then, based on their cause–effect relationships all portfolio risks are organized in a BN. Conditional probability distributions for this network are specified and the Bayesian networks method is used to estimate the probability of portfolio risk. This model was applied to a portfolio of a construction company located in Iran and proved effective in analyzing portfolio risk probability. Furthermore, the model provided valuable information for selecting a portfolio’s projects and making strategic decisions.

  9. A framework for combining social impact assessment and risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Mahmoudi, Hossein, E-mail: mahmoudi@uni-hohenheim.de [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Environmental Sciences Research Institute, Shahid Beheshti University, G.C. (Iran, Islamic Republic of); Renn, Ortwin [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany); Vanclay, Frank [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands); Hoffmann, Volker [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Karami, Ezatollah [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)

    2013-11-15

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, ‘risk and social impact assessment’ (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: • A hybrid model to combine SIA and SRA namely RSIA is proposed. • RSIA can provide the proper mechanism to assess social impacts of natural hazards. • RSIA can play the role of ex-post as well as ex-ante assessment. • For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary.

  10. A framework for combining social impact assessment and risk assessment

    International Nuclear Information System (INIS)

    Mahmoudi, Hossein; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    2013-01-01

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, ‘risk and social impact assessment’ (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: • A hybrid model to combine SIA and SRA namely RSIA is proposed. • RSIA can provide the proper mechanism to assess social impacts of natural hazards. • RSIA can play the role of ex-post as well as ex-ante assessment. • For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary

  11. AHP-based risk analysis of energy performance contracting projects in Russia

    International Nuclear Information System (INIS)

    Garbuzova-Schlifter, Maria; Madlener, Reinhard

    2016-01-01

    Understanding and properly managing risks that could potentially affect the target- and performance-based profits of energy performance contracting (EPC) projects are essential. It is particularly important for the establishment and success of energy service companies (ESCOs) acting in the vulnerable environment of the vast but highly energy-inefficient Russian market. This study systematically explores common risk factors and causes of risk associated with EPC projects executed in three Russian sectors: (1) industrial; (2) housing and communal services; and (3) public. Several interviews with the Russian EPC experts were accomplished and a qualitative risk assessment by using an analytic hierarchy process (AHP) approach. The data were obtained from a web-based questionnaire survey conducted among Russian EPC project executors. For each focus sector, a specific preference-based ranking of the identified risk factors and causes of risk was derived. The AHP results show that causes of risk related to the financial and regulatory aspects contribute most to the riskiness of EPC projects performed in all three focus sectors in Russia, calling for the special attention of EPC policy- and business-makers. Due to sectorial particularities and different actors involved, we conclude that there is a need for elaboration of sector-specific contractual schemes for EPC projects. - Highlights: • AHP- and survey-based study of energy performance contracting (EPC) projects in Russia. • Main risk factors and causes of risk associated with EPC projects are investigated. • In practice, lack of a feasible risk management approach in EPC projects. • Regulatory and financial risks contribute most to the EPC projects’ riskiness. • Elaboration of the sector-specific EPC project contractual scheme is required.

  12. Assessment of risks due to climate change for the Upper Tamakoshi Hydropower Project in Nepal

    Directory of Open Access Journals (Sweden)

    Sangam Shrestha

    2016-01-01

    Full Text Available Climate change poses significant challenges to hydropower development and management in mountainous basins. This study examined the impact of climate change, and the associated risks, on the energy production of the Upper Tamakoshi Hydropower Project, which is located in the Tamakoshi basin of Nepal. The outputs of three GCMs—namely MIROC-ESM, MRI-CGCM3, and MPI-ESM-M—under the Representative Concentration Pathways (RCP scenarios were used for the projection of precipitation and temperature in the future. The minimum and maximum temperatures of the basin are projected to increase by 6.33 °C and 3.82 °C, respectively, by 2100. The projected precipitation varies from −8% to +24.8%, which is expected to alter the streamflow by −37.83% to +47% in the future. Based on the streamflow output, the risk for energy production was calculated with respect to the baseline energy production of 1963 GW h and 2281 GW h. Using the three GCMs, the risk associated with annual hydropower production under altered runoff was analyzed. The risk percentage in the future periods shows a mild risk varying from 0.69% to 6.63%. MPI-ESM-M GCM projects a higher percentage of risk for energy production during the same future periods, as compared to the baseline energy production of 1963 GW h. A mild to moderate risk, ranging from 2.73% to 13.24% can be expected when energy production in the future is compared to the baseline energy production of 2281 GW h.

  13. Risk Management in Future Romanian E-Government 2.0 Projects

    Directory of Open Access Journals (Sweden)

    Didraga Otniel

    2015-08-01

    Full Text Available E-government public services in Romania must follow unitary procedures considering the new requirements of the European Union from the Digital Agenda for Europe Strategy 2020. E-government 2.0 has to be implemented because of the cultural and behavioral transformations in the interaction between governments and users of e-services. E-government 2.0 projects use tools and techniques of social media to accomplish their goals. This article examines the possible risk categories and the risk management procedures needed to mitigate risks in future Romanian e-government projects, according to the strategic lines of development for the Digital Agenda. We propose a risk management plan for the e-government lines of action within the strategic lines of development that includes identifying, assessing, and mitigating the risks. New and modernized government services through e-government 2.0 projects that apply risk management will bring a significant improvement in how citizens and businesses relate to government and will increase the use of e-government services.

  14. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    Hechanova, A.E.

    2000-01-01

    The Nevada Risk Assessment/Management Program (NRAMP) is part of a national effort by the U.S. Department of Energy (DOE) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the NRAMP project and presents a synopsis of the NRAMP effort which occurred from 1995 to 2000. The primary goals of the DOE in awarding the cooperative agreement establishing NRAMP were to (I) use a risk-based approach to evaluate the consequences of alternative actions in DOE's Environmental Remediation Programs at sites in Nevada and (2) use a neutral and credible institution outside the DOE to perform the risk assessments and contribute to public education about environmental management issues at the Nevada Test Site. (author)

  15. Environmental Comparative Risk Assessment: A Case Study

    International Nuclear Information System (INIS)

    Ali, M.M.

    2007-01-01

    Health and environmental impacts associated with energy production and industrial activities as well as food production and agricultural activities have had great concern in the last decades. Early activities emerged in late 80s of the last century through an Inter- Agency project (lAEA, UNDY, WHO, ... ) on the comparative risk assessment from energy systems and industrial complexes. A work-shop on Risk Assessment and Management in large industrial areas was held in Alexandria Egypt on 20-33 Det 1993, sponsored by IAEA. Several conferences, experts work groups and workshops were held there of Recent trends in determining risks are: 1. Use of probabilistic risk assessment approach to identify hazardous activities and accident scenario. 2. development of data base on failure probabilities and appropriate physical models. 3. Development of related directives and regulations and criteria Comparative risk assessment case study as a tool for comparing risk is emphasized Criteria of exposure to human and ecological risks are addressed

  16. The MARINA Risk Assessment Strategy: A Flexible Strategy for Efficient Information Collection and Risk Assessment of Nanomaterials.

    Science.gov (United States)

    Bos, Peter M J; Gottardo, Stefania; Scott-Fordsmand, Janeck J; van Tongeren, Martie; Semenzin, Elena; Fernandes, Teresa F; Hristozov, Danail; Hund-Rinke, Kerstin; Hunt, Neil; Irfan, Muhammad-Adeel; Landsiedel, Robert; Peijnenburg, Willie J G M; Sánchez Jiménez, Araceli; van Kesteren, Petra C E; Oomen, Agnes G

    2015-11-27

    An engineered nanomaterial (ENM) may actually consist of a population of primary particles, aggregates and agglomerates of various sizes. Furthermore, their physico-chemical characteristics may change during the various life-cycle stages. It will probably not be feasible to test all varieties of all ENMs for possible health and environmental risks. There is therefore a need to further develop the approaches for risk assessment of ENMs. Within the EU FP7 project Managing Risks of Nanoparticles (MARINA) a two-phase risk assessment strategy has been developed. In Phase 1 (Problem framing) a base set of information is considered, relevant exposure scenarios (RESs) are identified and the scope for Phase 2 (Risk assessment) is established. The relevance of an RES is indicated by information on exposure, fate/kinetics and/or hazard; these three domains are included as separate pillars that contain specific tools. Phase 2 consists of an iterative process of risk characterization, identification of data needs and integrated collection and evaluation of data on the three domains, until sufficient information is obtained to conclude on possible risks in a RES. Only data are generated that are considered to be needed for the purpose of risk assessment. A fourth pillar, risk characterization, is defined and it contains risk assessment tools. This strategy describes a flexible and efficient approach for data collection and risk assessment which is essential to ensure safety of ENMs. Further developments are needed to provide guidance and make the MARINA Risk Assessment Strategy operational. Case studies will be needed to refine the strategy.

  17. The MARINA Risk Assessment Strategy: A Flexible Strategy for Efficient Information Collection and Risk Assessment of Nanomaterials

    Directory of Open Access Journals (Sweden)

    Peter M. J. Bos

    2015-11-01

    Full Text Available An engineered nanomaterial (ENM may actually consist of a population of primary particles, aggregates and agglomerates of various sizes. Furthermore, their physico-chemical characteristics may change during the various life-cycle stages. It will probably not be feasible to test all varieties of all ENMs for possible health and environmental risks. There is therefore a need to further develop the approaches for risk assessment of ENMs. Within the EU FP7 project Managing Risks of Nanoparticles (MARINA a two-phase risk assessment strategy has been developed. In Phase 1 (Problem framing a base set of information is considered, relevant exposure scenarios (RESs are identified and the scope for Phase 2 (Risk assessment is established. The relevance of an RES is indicated by information on exposure, fate/kinetics and/or hazard; these three domains are included as separate pillars that contain specific tools. Phase 2 consists of an iterative process of risk characterization, identification of data needs and integrated collection and evaluation of data on the three domains, until sufficient information is obtained to conclude on possible risks in a RES. Only data are generated that are considered to be needed for the purpose of risk assessment. A fourth pillar, risk characterization, is defined and it contains risk assessment tools. This strategy describes a flexible and efficient approach for data collection and risk assessment which is essential to ensure safety of ENMs. Further developments are needed to provide guidance and make the MARINA Risk Assessment Strategy operational. Case studies will be needed to refine the strategy.

  18. BBN-Based Portfolio Risk Assessment for NASA Technology R&D Outcome

    Science.gov (United States)

    Geuther, Steven C.; Shih, Ann T.

    2016-01-01

    The NASA Aeronautics Research Mission Directorate (ARMD) vision falls into six strategic thrusts that are aimed to support the challenges of the Next Generation Air Transportation System (NextGen). In order to achieve the goals of the ARMD vision, the Airspace Operations and Safety Program (AOSP) is committed to developing and delivering new technologies. To meet the dual challenges of constrained resources and timely technology delivery, program portfolio risk assessment is critical for communication and decision-making. This paper describes how Bayesian Belief Network (BBN) is applied to assess the probability of a technology meeting the expected outcome. The network takes into account the different risk factors of technology development and implementation phases. The use of BBNs allows for all technologies of projects in a program portfolio to be separately examined and compared. In addition, the technology interaction effects are modeled through the application of object-oriented BBNs. The paper discusses the development of simplified project risk BBNs and presents various risk results. The results presented include the probability of project risks not meeting success criteria, the risk drivers under uncertainty via sensitivity analysis, and what-if analysis. Finally, the paper shows how program portfolio risk can be assessed using risk results from BBNs of projects in the portfolio.

  19. Modern Risk Assessment for Nuclear Power Plants High-Voltage Substations

    International Nuclear Information System (INIS)

    Ioan, S.; Hurdubetiu, S.; Marza, F.; Mocanu, M.; Stefan, M.

    2002-01-01

    The paper describes a first Romanian attempt to set up the methodology for risk assessment and control within high-voltage substations, developed for the Nuclear power plant in Cernavoda (Romania). Considering the present risk assessment methods the MENER Project will develop a new methodology, in line with the European Community legislation and with the specific regional needs. In order to correctly shape the necessary resources required by a risk analysis a large size enterprise (a nuclear power plant) is selected and the following five indicators will be estimated: the economic profit, environmental risk, indirect (future) risk, technology improvement and physic and psychological risk. The results are expected to considerably facilitate risk assessment, by: evaluating project acceptability; evaluating equipment compliance to regulatory criteria; estimating excluding clearances; easing the design of emergency programmes; identifying the equipment use restrictions; identifying the risk sources; selecting the maintenance and risk reduction methods; testing the procedures leading to future regulatory norms; suitability of the risk management system modification. The immediate result of employing modern risk assessment methods could be the decrease by one third of the expenses required by environment protection, staff health and labor safety and quality management. (author)

  20. A total risk assessment methodology for security assessment

    International Nuclear Information System (INIS)

    Auilar, Richard; Pless, Daniel J.; Kaplan, Paul Garry; Silva, Consuelo Juanita; Rhea, Ronald Edward; Wyss, Gregory Dane; Conrad, Stephen Hamilton

    2009-01-01

    Sandia National Laboratories performed a two-year Laboratory Directed Research and Development project to develop a new collaborative risk assessment method to enable decision makers to fully consider the interrelationships between threat, vulnerability, and consequence. A five-step Total Risk Assessment Methodology was developed to enable interdisciplinary collaborative risk assessment by experts from these disciplines. The objective of this process is promote effective risk management by enabling analysts to identify scenarios that are simultaneously achievable by an adversary, desirable to the adversary, and of concern to the system owner or to society. The basic steps are risk identification, collaborative scenario refinement and evaluation, scenario cohort identification and risk ranking, threat chain mitigation analysis, and residual risk assessment. The method is highly iterative, especially with regard to scenario refinement and evaluation. The Total Risk Assessment Methodology includes objective consideration of relative attack likelihood instead of subjective expert judgment. The 'probability of attack' is not computed, but the relative likelihood for each scenario is assessed through identifying and analyzing scenario cohort groups, which are groups of scenarios with comparable qualities to the scenario being analyzed at both this and other targets. Scenarios for the target under consideration and other targets are placed into cohort groups under an established ranking process that reflects the following three factors: known targeting, achievable consequences, and the resources required for an adversary to have a high likelihood of success. The development of these target cohort groups implements, mathematically, the idea that adversaries are actively choosing among possible attack scenarios and avoiding scenarios that would be significantly suboptimal to their objectives. An adversary who can choose among only a few comparable targets and scenarios (a

  1. Challenges in Risk Assessment: Quantitative Risk Assessment

    OpenAIRE

    Jacxsens, Liesbeth; Uyttendaele, Mieke; De Meulenaer, Bruno

    2016-01-01

    The process of risk analysis consists out of three components, risk assessment, risk management and risk communication. These components are internationally well spread by Codex Alimentarius Commission as being the basis for setting science based standards, criteria on food safety hazards, e.g. setting maximum limits of mycotoxins in foodstuffs. However, the technical component risk assessment is hard to elaborate and to understand. Key in a risk assessment is the translation of biological or...

  2. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  3. A prospective radiological risk assessment for a phosphate industry project

    Energy Technology Data Exchange (ETDEWEB)

    Lauria, Dejanira C.; Reis, Rocio G., E-mail: dejanira@ird.gov.br, E-mail: rocio@ird.gov.br

    2012-07-01

    The Santa Quiteria Project is the major Brazilian uranium mine project, nowadays. A peculiarity of this project is the association of uranium with phosphate and the mining and processing of both by two different enterprises. A private company will be responsible for the production of phosphoric acid and a state owned company will be responsible for the production of yellow cake. At full capacity, the facility will generate 10% of Brazil's total annual phosphoric acid production and 1,500 tons of yellow cake per year. The processing by which phosphoric acid is produced generates phosphogypsum (PG) as a by-product. The ratio of phosphogypsum to phosphoric acid is around 5 to 1. After all the phosphate has been extracted and processed, it is expected that some 37 million tons of phosphogypsum with 13 Bq/g of {sup 226}Ra will be produced. A prospective generic assessment was carried out for evaluating the potential radioactive impact of this PG stack on the workers and surrounding inhabitants. Two hypothetical farmer scenarios were designed to estimate the potential dose out of the project boundary and over the stack piles, after the shutdown of the project. The annual exposure dose of workers was also evaluated. As a result, the potential public and worker doses exceeded the adopted level of doses of 1mSv.y{sup -1} and 6 mSv.y{sup -1}, respectively. The simulation spotlighted the importance of the rainfall erosion index, and consequently the stack shape for the environmental contamination. The importance of planning the decommissioning of the facility still in the planning phase of the project to give support for the feasibility studies was also highlighter. Although quite conservative, the prospective assessing of dose herein is useful to aware and guide the decision makers on information and data survey and taking avoiding action to protect the health, by changing the project in some way. (author)

  4. Assessment of the implementation risks for ALFRED demonstrator

    International Nuclear Information System (INIS)

    Constantin, M.; Diaconu, D.

    2016-01-01

    The risks related to the implementation of ALFRED demonstrator in Romania are discussed. The assessment is based on the risk matrix approach. Two groups of experts were used in the investigation: participants in FP7 ARCADIA projects and members of the FALCON consortium. The results consist of the hierarchy of the risks obtained based on the appreciations of the two groups. They are comparatively presented and discussed in terms of the identified critical risks and possible measures for prevention and mitigation. Additionally, some elements derived from the experience of similar project such as SUSEN and ELI-NP are discussed. (authors)

  5. Investment Decision Support for Engineering Projects Based on Risk Correlation Analysis

    Directory of Open Access Journals (Sweden)

    Yan Liu

    2012-01-01

    Full Text Available Investment decisions are usually made on the basis of the subjective judgments of experts subjected to the information gap during the preliminary stages of a project. As a consequence, a series of errors in risk prediction and/or decision-making will be generated leading to out of control investment and project failure. In this paper, the variable fuzzy set theory and intelligent algorithms integrated with case-based reasoning are presented. The proposed algorithm manages the numerous fuzzy concepts and variable factors of a project and also sets up the decision-making process in accordance with past cases and experiences. Furthermore, it decreases the calculation difficulty and reduces the decision-making reaction time. Three types of risk correlations combined with different characteristics of engineering projects are summarized, and each of these correlations is expounded at the project investment decision-making stage. Quantitative and qualitative change theories of variable fuzzy sets are also addressed for investment risk warning. The approach presented in this paper enables the risk analysis in a simple and intuitive manner and realizes the integration of objective and subjective risk assessments within the decision-makers' risk expectation.

  6. Feasibility Risk Assessment of Transport Infrastructure Projects: The CBA-DK Decision Support Model

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Banister, David

    2010-01-01

    informed decision support towards decision-makers and stakeholders in terms of accumulated descending graphs. The decision support method developed in this paper aims to provide assistance in the analysis and ultimately the choice of action, while accounting for the uncertainties surrounding any transport......This paper presents the final version of the CBA-DK decision support model for assessment of transport projects. The model makes use of conventional cost-benefit analysis resulting in aggregated single point estimates and quantitative risk analysis using Monte Carlo simulation resulting in interval...... result, and the determination of suitable probability distributions. Use is made of the reference class forecasting information, such as that developed in Optimism Bias for adjustments to investment decisions that relate to all modes of transport. The CBA-DK decision support model results in more...

  7. A Quantitative Measure For Evaluating Project Uncertainty Under Variation And Risk Effects

    Directory of Open Access Journals (Sweden)

    A. Chenarani

    2017-10-01

    Full Text Available The effects of uncertainty on a project and the risk event as the consequence of uncertainty are analyzed. The uncertainty index is proposed as a quantitative measure for evaluating the uncertainty of a project. This is done by employing entropy as the indicator of system disorder and lack of information. By employing this index, the uncertainty of each activity and its increase due to risk effects as well as project uncertainty changes as a function of time can be assessed. The results are implemented and analyzed for a small turbojet engine development project as the case study. The results of this study can be useful for project managers and other stakeholders for selecting the most effective risk management and uncertainty controlling method.

  8. Understanding Pre-Quantitative Risk in Projects

    Science.gov (United States)

    Cooper, Lynne P.

    2011-01-01

    Standard approaches to risk management in projects depend on the ability of teams to identify risks and quantify the probabilities and consequences of these risks (e.g., the 5 x 5 risk matrix). However, long before quantification does - or even can - occur, and long after, teams make decisions based on their pre-quantitative understanding of risk. These decisions can have long-lasting impacts on the project. While significant research has looked at the process of how to quantify risk, our understanding of how teams conceive of and manage pre-quantitative risk is lacking. This paper introduces the concept of pre-quantitative risk and discusses the implications of addressing pre-quantitative risk in projects.

  9. Risk Assessment of Pollution Emergencies in Water Source Areas of the Hanjiang-to-Weihe River Diversion Project

    Science.gov (United States)

    Liu, Luyao; Feng, Minquan

    2018-03-01

    [Objective] This study quantitatively evaluated risk probabilities of sudden water pollution accidents under the influence of risk sources, thus providing an important guarantee for risk source identification during water diversion from the Hanjiang River to the Weihe River. [Methods] The research used Bayesian networks to represent the correlation between accidental risk sources. It also adopted the sequential Monte Carlo algorithm to combine water quality simulation with state simulation of risk sources, thereby determining standard-exceeding probabilities of sudden water pollution accidents. [Results] When the upstream inflow was 138.15 m3/s and the average accident duration was 48 h, the probabilities were 0.0416 and 0.0056 separately. When the upstream inflow was 55.29 m3/s and the average accident duration was 48 h, the probabilities were 0.0225 and 0.0028 separately. [Conclusions] The research conducted a risk assessment on sudden water pollution accidents, thereby providing an important guarantee for the smooth implementation, operation, and water quality of the Hanjiang-to-Weihe River Diversion Project.

  10. Risk analysis for renewable energy projects due to constraints arising

    Science.gov (United States)

    Prostean, G.; Vasar, C.; Prostean, O.; Vartosu, A.

    2016-02-01

    Starting from the target of the European Union (EU) to use renewable energy in the area that aims a binding target of 20% renewable energy in final energy consumption by 2020, this article illustrates the identification of risks for implementation of wind energy projects in Romania, which could lead to complex technical implications, social and administrative. In specific projects analyzed in this paper were identified critical bottlenecks in the future wind power supply chain and reasonable time periods that may arise. Renewable energy technologies have to face a number of constraints that delayed scaling-up their production process, their transport process, the equipment reliability, etc. so implementing these types of projects requiring complex specialized team, the coordination of which also involve specific risks. The research team applied an analytical risk approach to identify major risks encountered within a wind farm project developed in Romania in isolated regions with different particularities, configured for different geographical areas (hill and mountain locations in Romania). Identification of major risks was based on the conceptual model set up for the entire project implementation process. Throughout this conceptual model there were identified specific constraints of such process. Integration risks were examined by an empirical study based on the method HAZOP (Hazard and Operability). The discussion describes the analysis of our results implementation context of renewable energy projects in Romania and creates a framework for assessing energy supply to any entity from renewable sources.

  11. Model based risk assessment - the CORAS framework

    Energy Technology Data Exchange (ETDEWEB)

    Gran, Bjoern Axel; Fredriksen, Rune; Thunem, Atoosa P-J.

    2004-04-15

    Traditional risk analysis and assessment is based on failure-oriented models of the system. In contrast to this, model-based risk assessment (MBRA) utilizes success-oriented models describing all intended system aspects, including functional, operational and organizational aspects of the target. The target models are then used as input sources for complementary risk analysis and assessment techniques, as well as a basis for the documentation of the assessment results. The EU-funded CORAS project developed a tool-supported methodology for the application of MBRA in security-critical systems. The methodology has been tested with successful outcome through a series of seven trial within the telemedicine and ecommerce areas. The CORAS project in general and the CORAS application of MBRA in particular have contributed positively to the visibility of model-based risk assessment and thus to the disclosure of several potentials for further exploitation of various aspects within this important research field. In that connection, the CORAS methodology's possibilities for further improvement towards utilization in more complex architectures and also in other application domains such as the nuclear field can be addressed. The latter calls for adapting the framework to address nuclear standards such as IEC 60880 and IEC 61513. For this development we recommend applying a trial driven approach within the nuclear field. The tool supported approach for combining risk analysis and system development also fits well with the HRP proposal for developing an Integrated Design Environment (IDE) providing efficient methods and tools to support control room systems design. (Author)

  12. Assessment and uncertainty analysis of groundwater risk.

    Science.gov (United States)

    Li, Fawen; Zhu, Jingzhao; Deng, Xiyuan; Zhao, Yong; Li, Shaofei

    2018-01-01

    Groundwater with relatively stable quantity and quality is commonly used by human being. However, as the over-mining of groundwater, problems such as groundwater funnel, land subsidence and salt water intrusion have emerged. In order to avoid further deterioration of hydrogeological problems in over-mining regions, it is necessary to conduct the assessment of groundwater risk. In this paper, risks of shallow and deep groundwater in the water intake area of the South-to-North Water Transfer Project in Tianjin, China, were evaluated. Firstly, two sets of four-level evaluation index system were constructed based on the different characteristics of shallow and deep groundwater. Secondly, based on the normalized factor values and the synthetic weights, the risk values of shallow and deep groundwater were calculated. Lastly, the uncertainty of groundwater risk assessment was analyzed by indicator kriging method. The results meet the decision maker's demand for risk information, and overcome previous risk assessment results expressed in the form of deterministic point estimations, which ignore the uncertainty of risk assessment. Copyright © 2017 Elsevier Inc. All rights reserved.

  13. Highlight report: Launch of a large integrated European in vitro toxicology project: EU-ToxRisk.

    Science.gov (United States)

    Daneshian, Mardas; Kamp, Hennicke; Hengstler, Jan; Leist, Marcel; van de Water, Bob

    2016-05-01

    The integrated European project, EU-ToxRisk, proudly sees itself as "flagship" exploring new alternative-to-animal approaches to chemical safety evaluation. It promotes mechanism-based toxicity testing and risk assessment according to the principles laid down for toxicology for the twenty-first century. The project was officially launched in January 2016 with a kickoff meeting in Egmond aan Zee, the Netherlands. Over 100 scientists representing academia and industry as well as regulatory authorities attended the inaugural meeting. The project will integrate advances in in vitro and in silico toxicology, read-across methods, and adverse outcome pathways. EU-ToxRisk will continue to make use of the case study strategy deployed in SEURAT-1, a FP7 initiative ended in December 2015. Even though the development of new non-animal methods is one target of EU-ToxRisk, the project puts special emphasis on their acceptance and implementation in regulatory contexts. This €30 million Horizon 2020 project involves 38 European partners and one from the USA. EU-ToxRisk aims at the "development of a new way of risk assessment."

  14. Ethics of Risk. Kristin Shrader-Frechette's Philosophical Critique of Risk Assessment

    International Nuclear Information System (INIS)

    Heikkeroe, Topi

    2006-01-01

    This paper addresses risk assessment from a philosophical point of view. It presents and critically reviews the work of Kristin Shrader-Frechette. It introduces the ethical, epistemological, and methodological issues related to risk assessment. The paper focuses on the ethical questions of justice in risk decisions. It opens by framing the relationship between ethics and technology in the modern world. Then the paper turns to a brief description of risk assessment as a central method in technological decision making. It proceeds to show how Shrader-Frechette analyzes ethical and political aspects of risk assessment. The central argumentation In her critique follows RawIsian lines: distributive and participatory inequalities in creating technological constructions need to be justified. To clarify this requirement she formulates the Principle of Prima Facie Political Equity (PPFPE), which is her central tool in most of her ethical criticism, for instance, in relation to the future generations: prima facie. all generations should be treated equally. Brief critical remarks conclude the paper. They touch upon placing Shrader-Frechette's project on the academic chart and her liberal individualist anthropology

  15. Risk assessment handbook

    International Nuclear Information System (INIS)

    Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

    1990-09-01

    The Probabilistic Risk Assessment Unit at EG ampersand G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers' needs and the product have been established

  16. Ecological Risk Assessment of Genetically Modified Higher Plants (GMHP)

    DEFF Research Database (Denmark)

    Kjær, C.; Damgaard, C.; Kjellsson, G.

    Preface This publication is a first version of a manual identifying the data needs for ecological risk assessment of genetically modified higher plants (GMHP). It is the intention of the authors to stimulate further discussion of what data are needed in order to conduct a proper ecological risk...... of the project Biotechnology: elements in environmental risk assessment of genetically modified plants. December 1999 Christian Kjær Introduction In ecological risk assessment of transgenic plants, information on a wide range of subjects is needed for an effective and reliable assessment procedure...... in the amendment to the directive. This report suggests a structured way to identify the type of data needed to perform a sound ecological risk assessment for genetically modified higher plants (GMHP). The identified data types are intended to support the evaluation of the following risks: risk of invasion...

  17. The Fee Sensitive Risk Exposures of Project Authorized Person in Hong Kong

    Directory of Open Access Journals (Sweden)

    Sai-On Cheung

    2012-11-01

    Full Text Available Authorized Persons (AP play a critical role in the design and construction of building works in Hong Kong. Under the Building Ordinance, design and construction of building works need to be coordinated and monitored by an AP registered with the Buildings Department. Professionally qualified Architects, Engineers and Surveyors are eligible to register as AP after completing the prescribed assessment. In addition, the project AP is often appointed by the project owner to be the project team leader. In these capacities, a project AP is exposed to various risks. This paper seeks to identify the fee sensitive risk exposures of project APs. Through an ANOVA study, these risks exposures are those due to liabilities under the Building Ordinance at the construction stage, those towards the third parties and the clients.

  18. Introduction to Toxicity and Risk Assessment for Project Chemists

    Science.gov (United States)

    2012-03-27

    Toxicity of Hexavalent Chromium  External review complete  EPA will wait until studies underway on carcinogenic mode of action are complete to...finalize the assessment  NJ and Cal values for hex chrome 16 Risk-Based Screening Levels Resident Soil (mg/kg) Resident Water Use (µg/L) DRAFT 0.04

  19. Assessing Inter-Sectoral Climate Change Risks: The Role of ISIMIP

    Science.gov (United States)

    Rosenzweig, Cynthia; Arnell, Nigel W.; Ebi, Kristie L.; Lotze-Campen, Hermann; Raes, Frank; Rapley, Chris; Smith, Mark Stafford; Cramer, Wolfgang; Frieler, Katja; Reyer, Christopher P. O.; hide

    2017-01-01

    The aims of the Inter-Sectoral Impact Model Intercomparison Project (ISIMIP) are to provide a framework for the intercomparison of global and regional-scale risk models within and across multiple sectors and to enable coordinated multi-sectoral assessments of different risks and their aggregated effects. The overarching goal is to use the knowledge gained to support adaptation and mitigation decisions that require regional or global perspectives within the context of facilitating transformations to enable sustainable development, despite inevitable climate shifts and disruptions. ISIMIP uses community-agreed sets of scenarios with standardized climate variables and socioeconomic projections as inputs for projecting future risks and associated uncertainties, within and across sectors. The results are consistent multi-model assessments of sectoral risks and opportunities that enable studies that integrate across sectors, providing support for implementation of the Paris Agreement under the United Nations Framework Convention on Climate Change.

  20. Assessment report on NRP sub-theme 'Risk Analysis'

    International Nuclear Information System (INIS)

    Biesiot, W.; Hendrickx, L.; Olsthoorn, A.A.

    1995-01-01

    An overview and assessment are presented of the three research projects carried out under NRP funding that concern risk-related topics: (1) The risks of nonlinear climate changes, (2) Socio-economic and policy aspects of changes in incidence and intensity of extreme (weather) events, and (3) Characterizing the risks: a comparative analysis of the risks of global warming and of relevant policy strategies. 1 tab., 6 refs

  1. A Practical Risk Assessment Methodology for Safety-Critical Train Control Systems

    Science.gov (United States)

    2009-07-01

    This project proposes a Practical Risk Assessment Methodology (PRAM) for analyzing railroad accident data and assessing the risk and benefit of safety-critical train control systems. This report documents in simple steps the algorithms and data input...

  2. IV&V Project Assessment Process Validation

    Science.gov (United States)

    Driskell, Stephen

    2012-01-01

    The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.

  3. International Arctic Seas Assessment Project (IASAP)

    International Nuclear Information System (INIS)

    Sjoeblom, K.L.; Linsley, G.S.

    1995-01-01

    The purpose of this paper was to give an overall view of the International Arctic Seas Assessment Project (IASAP). The IASAP project was initiated in 1993 to address concerns about the possible health and environmental impacts of radioactive wastes dumped in the shallow waters of the Arctic seas by the former Soviet Union. The project is being executed as a part of the IAEA's responsibilities under the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter (London Convention 1972). The results and conclusions of the project are expected to be reported to the London Convention in late 1996. The objectives of the project are: 1) to assess the risks to human health and to the environment associated with the radioactive waste dumped in the Kara and Barents Seas; and 2) to examine possible remedial actions related to the dumped wastes and to advise on whether they are necessary and justified. The project is organized in five working areas: source terms, existing environmental concentrations, transfer mechanisms and models, impact assessment and remedial measures. Progress made in all working areas of IASAP is reviewed each year by a group of senior scientists (IASAP Advisory Group Meeting). During the first two years of the IASAP project, a considerable amount of new information has been produced and published as IASAP working documents. Experts from 15 countries and several international organizations are involved in the different Working Groups and Advisory Group Meetings of the project. It is planned that in addition to the report to the London Convention, which will be prepared by the Advisory Group, detailed technical reports covering the work of all areas of the IASAP will be produced. 12 refs., 3 figs., 1 tab

  4. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  5. World-wide risk assessment of the transportation of radioactive materials

    International Nuclear Information System (INIS)

    Ericsson, A.M.; Elert, M.

    1983-01-01

    The aim of the project reported in this paper is to develop the means and methods for a risk analysis of the transportation of radioactive materials throughout the world. The project was initiated by the Standing Advisory Group on the Safe Transport of Radioactive Materials (SAGSTRAM) of the IAEA. In 1979 the Swedish Nuclear Power Inspectorate and the IAEA signed an agreement on the development of a model for calculation of the transport risk. Member States of the IAEA are invited to use the model for a risk assessment of the transportation of radioactive materials in their own country. These assessments will be collected and analyzed and a world-wide risk assessment performed. The IAEA has the overall responsibility for the project and administers it. Sweden manages the project and has performed the applied research with the assistance of research support groups which have supplied data and analyses and performed some other parts of the project. An Oversight Committee with participants from eight Member States has reviewed the progress and has given valuable recommendations. It was important that the model had the sophistication and flexibility required for its use by all Member States but still was easy to handle. The risk calculations are performed by the computer code INTERTRAN which is based on the American computer code RADTRAN II developed by Sandia National Laboratories, Albuquerque, NM. The methodology of the RADTRAN II as well as data and format of the input and output was changed to make the code more internationally oriented. 2 references

  6. An Integrated Assessment Framework of Offshore Wind Power Projects Applying Equator Principles and Social Life Cycle Assessment

    Directory of Open Access Journals (Sweden)

    Yu-Che Tseng

    2017-10-01

    Full Text Available This paper reviews offshore wind power project finance and provides an integrated assessment that employs Equator Principles, life cycle assessment, risk assessment, materiality analysis, credit assessment, and ISAE 3000 assurance. We have not seen any comprehensive review papers or book chapters that covers the entire offshore wind power project finance process. We also conducted an SWancor Formosa Phase 1 case study to illustrate the application of integrated assessment to better assist policymakers, wind farm developers, practitioners, potential investors and observers, and stakeholders in their decisions. We believe that this paper can form part of the effort to reduce information asymmetry and the transaction costs of wind power project finance, as well as mobilize green finance investments from the financial sector to renewable energy projects to achieve a national renewable energy policy.

  7. A Corrosion Risk Assessment Model for Underground Piping

    Science.gov (United States)

    Datta, Koushik; Fraser, Douglas R.

    2009-01-01

    The Pressure Systems Manager at NASA Ames Research Center (ARC) has embarked on a project to collect data and develop risk assessment models to support risk-informed decision making regarding future inspections of underground pipes at ARC. This paper shows progress in one area of this project - a corrosion risk assessment model for the underground high-pressure air distribution piping system at ARC. It consists of a Corrosion Model of pipe-segments, a Pipe Wrap Protection Model; and a Pipe Stress Model for a pipe segment. A Monte Carlo simulation of the combined models provides a distribution of the failure probabilities. Sensitivity study results show that the model uncertainty, or lack of knowledge, is the dominant contributor to the calculated unreliability of the underground piping system. As a result, the Pressure Systems Manager may consider investing resources specifically focused on reducing these uncertainties. Future work includes completing the data collection effort for the existing ground based pressure systems and applying the risk models to risk-based inspection strategies of the underground pipes at ARC.

  8. Strategy for integrated CERCLA/NEPA risk assessments

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Haroun, L.A.; Peterson, J.M.; Blunt, D.A.; Fingleton, D.J.; Picel, M.H.

    1991-01-01

    The US Department of Energy (DOE) has established a policy whereby, for remedial actions, the procedural and documentational requirements of the National Environmental Policy Act (NEPA) are integrated with those of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. However, the objectives of risk assessment under NEPA and CERCLA differ somewhat. Until its recent application at contaminated sites, NEPA analysis has typically been applied to impacts from taking actions at clean sites (e.g., for construction activities), and a somewhat loosely structured process has historically been used to estimate relative risks for NEPA analyses. Decisions such as cleanup levels were not made on the basis of the risk estimates, and they therefore tended to be conservative and were not discussed in detail. In contrast, risks estimated for Superfund (CERCLA) sites are used to focus the decision-making process for those sites and support national prioritization for cleanup, and the US Environmental Protection Agency (EPA) has developed a detailed framework for preparing baseline health risk assessments for these sites. The purpose of this paper is to discuss issues related to intergrating the CERCLA and NEPA approaches into the risk assessments that have been prepared for a DOE remedial action project at the Weldon Spring site near St. Charles, Missouri. These issues are grouped into three basic categories: general assumptions for the impact evaluation, data management, and presentation of the methodology and results. This paper is not intended to represent DOE policy and guidance, nor does it represent the only approach that can be used for integrated risk assessments. It merely discusses the process that was used for the Weldon Spring project, articulating the issues that were encountered and how they were addressed

  9. MANAGEMENT OF TRANSURANIC (TRU) WASTE RETRIEVAL PROJECT RISKS SUCCESSES IN THE STARTUP OF THE HANFORD 200 AREA TRU WASTE RETRIEVAL PROJECT

    International Nuclear Information System (INIS)

    GREENWLL, R.D.

    2005-01-01

    A risk identification and mitigation method applied to the Transuranic (TRU) Waste Retrieval Project performed at the Hanford 200 Area burial grounds is described. Retrieval operations are analyzed using process flow diagramming. and the anticipated project contingencies are included in the Authorization Basis and operational plans. Examples of uncertainties assessed include degraded container integrity, bulged drums, unknown containers, and releases to the environment. Identification and mitigation of project risks contributed to the safe retrieval of over 1700 cubic meters of waste without significant work stoppage and below the targeted cost per cubic meter retrieved. This paper will be of interest to managers, project engineers, regulators, and others who are responsible for successful performance of waste retrieval and other projects with high safety and performance risks

  10. Risk management for engineering projects procedures, methods and tools

    CERN Document Server

    Munier, Nolberto

    2014-01-01

    Many people see risk in engineering projects as an imprecise and nebulous problem - something that exists, is feared and is impossible to deal with. Nothing could be further from the truth. While risk is certainly ubiquitous, sometimes difficult to detect, and cannot always be completely avoided, it can generally be mitigated, reduced or prevented through timely analysis and action.   This book covers the entire process of risk management by providing methodologies for determining the sources of project risk, and once threats have been identified, managing them through:   ·         identification and assessment (probability, relative importance, variables, risk breakdown structure, etc.) ·         implementation of measures for their prevention, reduction or mitigation ·         evaluation of impacts and quantification of risks ·         establishment of control measures   It also considers sensitivity analysis to determine the influence of uncertain parameters values ...

  11. Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

    International Nuclear Information System (INIS)

    Vierow, Karen; Aldemir, Tunc

    2009-01-01

    The project entitled, 'Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors', was conducted as a DOE NERI project collaboration between Texas A and M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

  12. Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Vierow, Karen; Aldemir, Tunc

    2009-09-10

    The project entitled, “Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors”, was conducted as a DOE NERI project collaboration between Texas A&M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

  13. Deep Uncertainty Surrounding Coastal Flood Risk Projections: A Case Study for New Orleans

    Science.gov (United States)

    Wong, Tony E.; Keller, Klaus

    2017-10-01

    Future sea-level rise drives severe risks for many coastal communities. Strategies to manage these risks hinge on a sound characterization of the uncertainties. For example, recent studies suggest that large fractions of the Antarctic ice sheet (AIS) may rapidly disintegrate in response to rising global temperatures, leading to potentially several meters of sea-level rise during the next few centuries. It is deeply uncertain, for example, whether such an AIS disintegration will be triggered, how much this would increase sea-level rise, whether extreme storm surges intensify in a warming climate, or which emissions pathway future societies will choose. Here, we assess the impacts of these deep uncertainties on projected flooding probabilities for a levee ring in New Orleans, LA. We use 18 scenarios, presenting probabilistic projections within each one, to sample key deeply uncertain future projections of sea-level rise, radiative forcing pathways, storm surge characterization, and contributions from rapid AIS mass loss. The implications of these deep uncertainties for projected flood risk are thus characterized by a set of 18 probability distribution functions. We use a global sensitivity analysis to assess which mechanisms contribute to uncertainty in projected flood risk over the course of a 50-year design life. In line with previous work, we find that the uncertain storm surge drives the most substantial risk, followed by general AIS dynamics, in our simple model for future flood risk for New Orleans.

  14. Assessment of Students Projects

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; Stachowicz, Marian S.

    2012-01-01

    The evaluation and assessment of engineering programmes is a big issue, and there exist many concepts and methods. This paper deals with the assessment methods which can be used when assessing the knowledge, skills and competences developed in projects using PBL (problem based and project organized...... learning) pedagogical approaches. The experience of assessing first year projects from the Medialogy education at Aalborg University and third year projects from the Electrical and Computer Engineering Department at University of Minnesota, Duluth are presented, and the different methods discussed....... The conclusion is that process as well as product has to be assessed in a way which evaluates all aspects of students’ learning outcomes....

  15. Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project

    NARCIS (Netherlands)

    van Os, A.; van Berkel, F.J.F.W.; de Gilder, T.C.; van Dyck, C.; Groenewegen, P.

    2015-01-01

    This paper explores the role of social identity threat in risk discourse in an infrastructure project, and the consequences risk discourse has for cooperation between stakeholders. We show that risks posed a threat to the identity of the project team, resulting in a discourse focused on attributing

  16. Methodology evaluation of innovative projects under risk and uncertainty

    Directory of Open Access Journals (Sweden)

    2012-09-01

    Full Text Available This article deals with problems connected with the assessment of innovative projects in the context of risk and uncertainty, topical issues of evaluation of innovative projects at the present stage of development of the Russian economy. By the example of the solution of the "crossing the river" is considering the possibility of using hierarchical models to address it. In what follows, and compares the priorities of different groups of factors are given by calculating the overall costs and benefits. The paper provides a rationale for combined use of four aspects: the beneficial aspects of the decision (the benefits and opportunities and negative (costs and risks that may lead to the decision in question.

  17. Assessing social and economic effects of perceived risk: Workshop summary: Draft: BWIP Repository Project

    International Nuclear Information System (INIS)

    Nealey, S.M.; Liebow, E.B.

    1988-03-01

    The US Department of Energy sponsored a one-day workshop to discuss the complex dimensions of risk judgment formation and the assessment of social and economic effects of risk perceptions related to the permanent underground storage of highly radioactive waste from commercial nuclear power plants. Affected parties have publicly expressed concerns about potentially significant risk-related effects of this approach to waste management. A selective review of relevant literature in psychology, decision analysis, economics, sociology, and anthropology was completed, along with an examination of decision analysis techniques that might assist in developing suitable responses to public risk-related concerns. The workshop was organized as a forum in which a set of distinguished experts could exchange ideas and observations about the problems of characterizing the effects of risk judgments. Out of the exchange emerged the issues or themes of problems with probabilistic risk assessment techniques are evident; differences exist in the way experts and laypersons view risk, and this leads to higher levels of public concern than experts feel are justified; experts, risk managers, and decision-makers sometimes err in assessing risk and in dealing with the public; credibility and trust are important contributing factors in the formation of risk judgments; social and economic consequences of perceived risk should be properly anticipated; improvements can be made in informing the public about risk; the role of the public in risk assessment, risk management and decisions about risk should be reconsidered; and mitigation and compensation are central to resolving conflicts arising from divergent risk judgments. 1 tab

  18. IAEA Nuclear Security Assessment Methodologies (NUSAM) Project for Regulated Facilities

    International Nuclear Information System (INIS)

    Jang, Sung Soon

    2016-01-01

    Nuclear Security Assessment Methodologies (NUSAM) is a coordinate research project. The objectives of the NUSAM project is to establish a risk informed, performance-based methodological framework in a systematic, structured, comprehensive and appropriately transparent manner; to provide an environment for the sharing and transfer of knowledge and experience; and to provide guidance on, and practical examples of good practices in assessing the security of nuclear and other radioactive materials, as well as associated facilities and activities. The author worked as an IAEA scientific secretary of the NUAM project from 2013 to 2015. IAEA launched this project in 2013 and performed many activities: meetings, document development, table-top exercises and computer simulations. Now the project is in the final stage and will be concluded in the late 2016. The project will produce documents on NUSAM assessment methods and case study documents on NPP, Irradiator Facility and Transport. South Korea as a main contributor to this project will get benefits from the NUSAM. In 2014, South Korea introduced force-on-force exercises, which could be used as the assessment of physical protection system by the methods of NUSAM

  19. IAEA Nuclear Security Assessment Methodologies (NUSAM) Project for Regulated Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Sung Soon [Korea Nuclear Non-proliferation and Control, Daejeon (Korea, Republic of)

    2016-05-15

    Nuclear Security Assessment Methodologies (NUSAM) is a coordinate research project. The objectives of the NUSAM project is to establish a risk informed, performance-based methodological framework in a systematic, structured, comprehensive and appropriately transparent manner; to provide an environment for the sharing and transfer of knowledge and experience; and to provide guidance on, and practical examples of good practices in assessing the security of nuclear and other radioactive materials, as well as associated facilities and activities. The author worked as an IAEA scientific secretary of the NUAM project from 2013 to 2015. IAEA launched this project in 2013 and performed many activities: meetings, document development, table-top exercises and computer simulations. Now the project is in the final stage and will be concluded in the late 2016. The project will produce documents on NUSAM assessment methods and case study documents on NPP, Irradiator Facility and Transport. South Korea as a main contributor to this project will get benefits from the NUSAM. In 2014, South Korea introduced force-on-force exercises, which could be used as the assessment of physical protection system by the methods of NUSAM.

  20. A comparison of radiological risk assessment models: Risk assessment models used by the BEIR V Committee, UNSCEAR, ICRP, and EPA (for NESHAP)

    International Nuclear Information System (INIS)

    Wahl, L.E.

    1994-03-01

    Radiological risk assessments and resulting risk estimates have been developed by numerous national and international organizations, including the National Research Council's fifth Committee on the Biological Effects of Ionizing Radiations (BEIR V), the United Nations Scientific Committee on the Effects of Atomic Radiation (UNSCEAR), and the International Commission on Radiological Protection (ICRP). A fourth organization, the Environmental Protection Agency (EPA), has also performed a risk assessment as a basis for the National Emission Standards for Hazardous Air Pollutants (NESHAP). This paper compares the EPA's model of risk assessment with the models used by the BEIR V Committee, UNSCEAR, and ICRP. Comparison is made of the values chosen by each organization for several model parameters: populations used in studies and population transfer coefficients, dose-response curves and dose-rate effects, risk projection methods, and risk estimates. This comparison suggests that the EPA has based its risk assessment on outdated information and that the organization should consider adopting the method used by the BEIR V Committee, UNSCEAR, or ICRP

  1. 基于风险矩阵的BOT-TOT-PPP项目融资风险评估%The Risk Assessment of BOT-TOT-PPP Project Financing Based on Risk Matrix

    Institute of Scientific and Technical Information of China (English)

    李力

    2012-01-01

    风险评估在BOT-TOT-PPP项目中至关重要。本文通过大量案例调研指出,现阶段BOT-TOT-PPP项目融资的风险因素来源于项目外部的政治、经济、文化、社会(环保)以及内部的合同制订、工程技术能力、管理能力和投融资能力方面。风险矩阵和Borda序值对风险的量化评估表明,此类项目现阶段的关键风险集中在政府项目融资管理的专业化水平较低、合同双方对关键指标的确定不合理、投融资管理和工程实施存在问题等方面。%Risk assessment is paramount in BOT-TOT-PPP project.It is indicated through a great deal of cases that risk factors of BOT-TOT-PPP project financing currently derive from politics,economy,culture,society(environmental protection) beyond project,and contract establishment,engineering technology ability,management ability,investment financing ability within project.Quantitative evaluation of risk matrix and Borda counting on risk shows that today major risk of such project concentrates on low management level of governmental project financing,irrational key index in mutual contract,problems involved in financing management and engineering implementation.

  2. A New Approach to Feasibility Risk Assessment within Transport Infrastructure Appraisal

    DEFF Research Database (Denmark)

    Salling, Kim Bang

    2013-01-01

    This paper introduces a new approach of applying feasibility risk assessment within transport project infrastructure appraisal. The procedure is based upon quantitative risk analysis and Monte Carlo simulation in combination with conventional cost-benefit analysis converting deterministic benefit...... are, hereby, often basing their decisions on wrongful material. The presented approach to transport infrastructure appraisal is to include uncertainties and risks in the evaluation. Correspondingly, the handling of uncertainties and risk within transport project assessment are often made up...... by sensitivity tests producing deterministically based output values. Research has proven that traditional sensitivity analysis seldomnly captures the total variability especially as concerns the costs and demands estimated in the pre-stage of the evaluation. Therefore, this paper introduces an approach...

  3. Data quality objectives for two risk assessments at Hanford

    International Nuclear Information System (INIS)

    Lane, N.K.; Clark, S.W.; Tranbarger, R.K.; Roeck, F.V.

    1996-01-01

    The opportunity for innovative thinking prevails at the US Department of Energy's Hanford Site in southeastern Washington state. Two projects, in particular, challenged risk assessment staff. They are: (1) a combined Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)/Resource Conservation and Recovery Act (RCRA) risk assessment, and (2) developing a risk assessment for a mixed-waste disposal facility. The combined CERCLA/RCRA risk assessment involved establishing data quality objectives (DQO) either to meet clean closure for a RCRA treatment, storage and/or disposal facility (TSD) or (if the former was not possible) to conform to goals established for industrial land use for Hanford Past-Practice Strategy (HPPS) sites. Radionuclide analysis was reduced by 60 percent through the DQO process

  4. Including Health in Environmental Assessments of Major Transport Infrastructure Projects: A Documentary Analysis.

    Science.gov (United States)

    Riley, Emily; Harris, Patrick; Kent, Jennifer; Sainsbury, Peter; Lane, Anna; Baum, Fran

    2018-05-10

    Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considered in EAs of four major transport projects in Australia. We developed a comprehensive coding framework to analyse the Environmental Impact Statements (EISs) of four transport infrastructure projects: three road and one light rail. The coding framework was designed to capture how health was directly and indirectly included. We found that health was partially considered in all four EISs. In the three New South Wales (NSW) projects, but not the one South Australian project, this was influenced by the requirements issued to proponents by the government which directed the content of the EIS. Health was assessed using human health risk assessment (HHRA). We found this to be narrow in focus and revealed a need for a broader social determinants of health approach, using multiple methods. The road assessments emphasised air quality and noise risks, concluding these were minimal or predicted to improve. The South Australian project was the only road project not to include health data explicitly. The light rail EIS considered the health benefits of the project whereas the others focused on risk. Only one project considered mental health, although in less detail than air quality or noise. Our findings suggest EIAs lag behind the known evidence linking transport infrastructure to health. If health is to be comprehensively included, a more complete model of health is required, as well as a shift away from health risk assessment as the main method used. This needs to be mandatory for all significant developments. We also found that considering health only at the EIA stage may be a significant

  5. Risk assessment and societal choices

    Energy Technology Data Exchange (ETDEWEB)

    Otway, H J

    1975-02-15

    Many countries are experiencing a period in which traditional values are being questioned; plans for further technological progress are being met by a variety of demands for a closer examination of the benefits and risks of large-scale technologies. In this paper the concepts of risk assessment are presented and a model is proposed which illustrates the importance of socio-psychological mechanisms in the acceptance of technological risks. The research plan of the Joint IAEA/IIASA Research Project is outlined: this work is directed toward gaining an improved understanding of how societies judge the acceptability of technologies and how societal attitudes and anticipated responses may be better integrated into the decision-making process. Some preliminary results are reported. (author)

  6. Risk assessment and societal choices

    International Nuclear Information System (INIS)

    Otway, H.J.

    1975-01-01

    Many countries are experiencing a period in which traditional values are being questioned; plans for further technological progress are being met by a variety of demands for a closer examination of the benefits and risks of large-scale technologies. In this paper the concepts of risk assessment are presented and a model is proposed which illustrates the importance of socio-psychological mechanisms in the acceptance of technological risks. The research plan of the Joint IAEA/IIASA Research Project is outlined: this work is directed toward gaining an improved understanding of how societies judge the acceptability of technologies and how societal attitudes and anticipated responses may be better integrated into the decision-making process. Some preliminary results are reported. (author)

  7. Effects of Risk Management Practices on IT Project Success

    Directory of Open Access Journals (Sweden)

    Pimchangthong Daranee

    2017-03-01

    Full Text Available Successful management of an information technology (IT project is the most desirable for all organisations and stakeholders. Many researchers elaborated that risk management is a key part of project management for any project size. Risk management is so critical because it provides project managers with a forward-looking view of both threats and opportunities to improve the project success. The objectives of this research are to explore organisational factors affecting IT project success and risk management practices influencing IT project success. Risk management practices include risk identification, risk analysis, risk response planning, and risk monitoring and control. The IT project success is measured by process performance and product performance. Data are collected from 200 project managers, IT managers, and IT analysts in IT firms through questionnaires and analysed using Independent Sample t-test, One-way ANOVA, and Multiple Linear Regression at the statistical significance level of 0.05. The results show that the differences in organisational types affect IT project success in all aspects, while the differences on organisational sizes affect IT project success in the aspect of product performance and total aspects. Risk identification and risk response planning influence the process performance and the total aspects of IT project success. Risk identification has the highest positive influence on product performance, followed closely by risk response, while risk analysis negatively influences product performance.

  8. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  9. Acute Radiation Risk and BRYNTRN Organ Dose Projection Graphical User Interface

    Science.gov (United States)

    Cucinotta, Francis A.; Hu, Shaowen; Nounu, Hateni N.; Kim, Myung-Hee

    2011-01-01

    The integration of human space applications risk projection models of organ dose and acute radiation risk has been a key problem. NASA has developed an organ dose projection model using the BRYNTRN with SUM DOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUM DOSE are a Baryon transport code and an output data processing code, respectively. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN. A GUI for the ARR and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. BRYNTRN code operation requires extensive input preparation. Only a graphical user interface (GUI) can handle input and output for BRYNTRN to the response models easily and correctly. The purpose of the GUI development for ARRBOD is to provide seamless integration of input and output manipulations for the operations of projection modules (BRYNTRN, SLMDOSE, and the ARR probabilistic response model) in assessing the acute risk and the organ doses of significant Solar Particle Events (SPEs). The assessment of astronauts radiation risk from SPE is in support of mission design and operational planning to manage radiation risks in future space missions. The ARRBOD GUI can identify the proper shielding solutions using the gender-specific organ dose assessments in order to avoid ARR symptoms, and to stay within the current NASA short-term dose limits. The quantified evaluation of ARR severities based on any given shielding configuration and a specified EVA or other mission

  10. Study on Risk Approaches in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Claudiu BRANDAS

    2012-01-01

    Full Text Available Risk approaches in project development led to the integration in the IT project management methodologies and software development of activities and processes of risk management. The diversity and the advanced level of the used technologies in IT projects with increasing com-plexity leads to an exponential diversification of risk factors.The purpose of this research is to identify the level of the risk approach in IT projects both at the IT project management and software development methodologies level and the level of the perception of IT project man-agers, IT managers and IT analysts in Romanian IT companies. Thus, we want to determine the correlation between the use of a project management or software development methodology and the overall level of risk perceived by the project managers using these methodologies.

  11. Changing pattern of landslide risk in Europe - The SafeLand project

    Science.gov (United States)

    Nadim, F.; Kalsnes, B.

    2012-04-01

    The need to protect people and property with a changing pattern of landslide hazard and risk caused by climate change and changes in demography, and the reality for societies in Europe to live with the risk associated with natural hazards, were the motives for the project SafeLand: "Living with landslide risk in Europe: Assessment, effects of global change, and risk management strategies." SafeLand is a large, integrating research project under the European Commission's 7th Framework Programme (FP7). The project started on 1 May 2009 and will end on 30 April 2012. It involves 27 partners from 12 European countries, and has international collaborators and advisers from China, India, USA, Japan and Hong Kong. SafeLand also involves 25 End-Users from 11 countries. SafeLand is coordinated by the International Centre for Geohazards (ICG) at Norwegian Geotechnical Institute in Norway. Further information on the SafeLand project can be found at its web site http://safeland-fp7.eu/. Main results achieved in SafeLand include: - Various guidelines related to landslide triggering processes and run-out modelling. - Development and testing of several empirical methods for predicting the characteristics of threshold rainfall events for triggering of precipitation-induced landslides, and development of an empirical model for assessing the changes in landslide frequency (hazard) as a function of changes in the demography and population density. - Guideline for landslide susceptibility, hazard and risk assessment and zoning. - New methodologies for physical and societal vulnerability assessment. - Identification of landslide hazard and risk hotspots for Europe. The results show clearly where areas with the largest landslide risk are located in Europe and the objective approach allows a ranking of the countries by exposed area and population. - Different regional and local climate model simulations over selected regions of Europe at spatial resolutions of 10x10 km and 2.8x2.8 km

  12. Streamlining project delivery through risk analysis.

    Science.gov (United States)

    2015-08-01

    Project delivery is a significant area of concern and is subject to several risks throughout Plan Development : Process (PDP). These risks are attributed to major areas of project development, such as environmental : analysis, right-of-way (ROW) acqu...

  13. Risks Associated with Unconventional Gas Extraction Projects. Induced Seismicity, NORM and Ecological Risks

    International Nuclear Information System (INIS)

    Rodrigo-Naharro, J.; Hurtado, A.; Eguilior, S.; Recreo, F.

    2015-01-01

    The latest technological advances in hydraulic fracturing (fracking) and horizontal drilling are globally driving the commercial extraction of unconventional resources. Although there is still no commercial exploitation of these resources within the EU, the fact that there are potential reserves in some countries, such as Spain, stimulates the need of performing preliminary studies to define the characteristics that an unconventional gas extraction project should consider. The object of these features are the safety of the project, thus minimizing the probabilities of negative environmental impacts, and especially since there is not any EU Framework Directive focusing on the regulation of the operation of such fossil fuels. A project of this nature, involving natural systems, must start from the knowledge of these systems and from an assessment of its features in order to reach the environmental safety of the operations. Moreover, the implementation of risk management systems, along with the existence of an appropriate legislation and supervision are key elements in the development of unconventional gas extraction projects that are environmentally friendly. The present report includes, among the overall risks associated with such projects, those related to: i) the induced seismicity; ii) the Naturally-Occurring Radioactive Materials (NORM); and iii) the ecology.

  14. Can statistical data qualify assessments of children at risk?

    DEFF Research Database (Denmark)

    Søbjerg, Lene Mosegaard; Villumsen, Anne Marie Anker; Klitbjerg-Nielsen, Christina

    and parents that are already registered in the municipality such as home address and school records. A similar tool is being developed in a social work research project in Denmark. The idea is to include risk and protection factors such as information about health, school absenteeism and family circumstances......Every day municipalities across Europe (and beyond) receive notifications about children at risk. The notifications come from teachers, health professionals, social workers, neighbors, or anyone else who sees a child, which appears not to thrive. The assessment and validation of whether the child...... significantly from case to case. Third, the relative importance of the different risk and protection factors is complex and difficult to assess – especially when the social worker has to assess both immediate danger as well as risk of long term failure-to-thrive. Internationally, different risk assessment tools...

  15. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  16. Assessing corporate project impacts in changeable contexts: A human rights perspective

    Energy Technology Data Exchange (ETDEWEB)

    Salcito, Kendyl, E-mail: kendyl.salcito@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland); NomoGaia, 1900 Wazee Street, Suite 303, Denver, CO 80202 (United States); NewFields, LLC, Denver, CO 80202 (United States); Singer, Burton H., E-mail: bhsinger@epi.ufl.edu [Emerging Pathogens Institute, University of Florida, Gainesville, FL 32610 (United States); Krieger, Gary R., E-mail: gkrieger@newfields.com [NewFields, LLC, Denver, CO 80202 (United States); Weiss, Mitchell G., E-mail: mitchell-g.weiss@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland); Wielga, Mark, E-mail: wielga@nomogaia.org [NomoGaia, 1900 Wazee Street, Suite 303, Denver, CO 80202 (United States); NewFields, LLC, Denver, CO 80202 (United States); Utzinger, Jürg, E-mail: juerg.utzinger@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland)

    2014-07-01

    Project-level impact assessment was originally conceived as a snapshot taken in advance of project implementation, contrasting current conditions with a likely future scenario involving a variety of predicted impacts. Current best practice guidance has encouraged a shift towards longitudinal assessments from the pre-project stage through the implementation and operating phases. Experience and study show, however, that assessment of infrastructure-intensive projects rarely endures past the project's construction phase. Negative consequences for environmental, social and health outcomes have been documented. Such consequences clarify the pressing need for longitudinal assessment in each of these domains, with human rights impact assessment (HRIA) as an umbrella over, and critical augmentation of, environmental, social and health assessments. Project impacts on human rights are more closely linked to political, economic and other factors beyond immediate effects of a company's policy and action throughout the project lifecycle. Delineating these processes requires an adequate framework, with strategies for collecting longitudinal data, protocols that provide core information for impact assessment and guidance for adaptive mitigation strategies as project-related effects change over time. This article presents general principles for the design and implementation of sustained, longitudinal HRIA, based on experience assessing and responding to human rights impact in a uranium mining project in Malawi. The case study demonstrates the value of longitudinal assessment both for limiting corporate risk and improving human welfare. - Graphical abstract: Assessing changes in human rights condition as affected by both project and context, over time. - Highlights: • Corporate capital projects affect human rights in myriad ways. • Ongoing, longitudinal impact assessment techniques are needed. • We present an approach for conducting longitudinal human rights impact

  17. Assessing corporate project impacts in changeable contexts: A human rights perspective

    International Nuclear Information System (INIS)

    Salcito, Kendyl; Singer, Burton H.; Krieger, Gary R.; Weiss, Mitchell G.; Wielga, Mark; Utzinger, Jürg

    2014-01-01

    Project-level impact assessment was originally conceived as a snapshot taken in advance of project implementation, contrasting current conditions with a likely future scenario involving a variety of predicted impacts. Current best practice guidance has encouraged a shift towards longitudinal assessments from the pre-project stage through the implementation and operating phases. Experience and study show, however, that assessment of infrastructure-intensive projects rarely endures past the project's construction phase. Negative consequences for environmental, social and health outcomes have been documented. Such consequences clarify the pressing need for longitudinal assessment in each of these domains, with human rights impact assessment (HRIA) as an umbrella over, and critical augmentation of, environmental, social and health assessments. Project impacts on human rights are more closely linked to political, economic and other factors beyond immediate effects of a company's policy and action throughout the project lifecycle. Delineating these processes requires an adequate framework, with strategies for collecting longitudinal data, protocols that provide core information for impact assessment and guidance for adaptive mitigation strategies as project-related effects change over time. This article presents general principles for the design and implementation of sustained, longitudinal HRIA, based on experience assessing and responding to human rights impact in a uranium mining project in Malawi. The case study demonstrates the value of longitudinal assessment both for limiting corporate risk and improving human welfare. - Graphical abstract: Assessing changes in human rights condition as affected by both project and context, over time. - Highlights: • Corporate capital projects affect human rights in myriad ways. • Ongoing, longitudinal impact assessment techniques are needed. • We present an approach for conducting longitudinal human rights impact assessment

  18. Alpha-risk: a European project on the quantification of risks associated with multiple radiation exposures

    International Nuclear Information System (INIS)

    Laurier, D.; Monchaux, G.; Tirmarche, M.; Darby, S.; Cardis, E.; Binks, K.; Hofmann, W.; Muirhead, C.

    2006-01-01

    The Alpha-Risk research project is being conducted within the Sixth European Framework Programme (EC-FP6, 2005 -2008). It aims to improve the quantification of risks associated with multiple exposures, taking into account the contribution of different radionuclides and external exposure using specific organ dose calculations. The Alpha-Risk Consortium involves 18 partners from 9 countries, and is coordinated by the IRSN. Its composition allows a multidisciplinary collaboration between researchers in epidemiology, dosimetry, statistics, modelling and risk assessment. Alpha-Risk brings together major epidemiological studies in Europe, which are able to evaluate long-term health effects of internal exposure from radionuclides. It includes large size cohort and case-control studies, with accurate registration of individual annual exposures: uranium miner studies, studies on lung cancer and indoor radon exposure, and studies of lung cancer and leukaemia among nuclear workers exposed to transuranic nuclides (mainly uranium and plutonium), for whom organ doses will be reconstructed individually. The contribution of experts in dosimetry will allow the calculation of organ doses in presence of multiple exposures (radon decay products, uranium dust and external gamma exposure). Expression of the risk per unit organ dose will make it possible to compare results with those from other populations exposed to external radiation. The multidisciplinary approach of Alpha-Risk promotes the development of coherent and improved methodological approaches regarding risk modelling. A specific work - package is dedicated to the integration of results and their use for risk assessment, especially for radon. Alpha-Risk will contribute to a better understanding of long-term health risks following chronic low doses from internal exposures. The project also has the great potential to help resolve major public health concerns about the effects of low and/or protracted exposures, especially

  19. Obsolescence Risk Assessment Process Best Practice

    Science.gov (United States)

    Romero Rojo, F. J.; Roy, R.; Kelly, S.

    2012-05-01

    A component becomes obsolete when it is no longer available from the original manufacturer to the original specification. In long-lifecycle projects, obsolescence has become a major problem as it prevents the maintenance of the system. This is the reason why obsolescence management is now an essential part of the product support activities in sectors such as defence, aerospace, nuclear and railway; where systems need to be supported for several decades. The obsolescence risk assessment for the bill of materials (BoM) is a paramount activity in order to manage obsolescence proactively and cost-effectively. This is the reason why it was necessary to undertake a benchmarking study to develop best practice in this process. A total of 22 obsolescence experts from 13 different organisations/projects from across UK and USA have participated in this study. Their current processes and experience have been taken into account in the development of the best practice process for obsolescence risk assessment. The key factors that have to be analysed in the risk assessment process for each component in the BoM are: number of manufacturers, years to end of life, stock available, consumption rate and operational impact criticality. For the very high risk components, a more detailed analysis is required to inform the decisions regarding the most suitable mitigation strategies. On the contrary, for the low risk components, a fully proactive approach is neither appropriate nor cost effective. Therefore, it is advised for these components that obsolescence issues are dealt with reactively. This process has been validated using case studies with several experts from industry and is currently being implemented by the UK Ministry of Defence as technical guidance within the JSP 886 Volume 7 Part 8.13 standards.

  20. Obsolescence Risk Assessment Process Best Practice

    International Nuclear Information System (INIS)

    Rojo, F J Romero; Roy, R; Kelly, S

    2012-01-01

    A component becomes obsolete when it is no longer available from the original manufacturer to the original specification. In long-lifecycle projects, obsolescence has become a major problem as it prevents the maintenance of the system. This is the reason why obsolescence management is now an essential part of the product support activities in sectors such as defence, aerospace, nuclear and railway; where systems need to be supported for several decades. The obsolescence risk assessment for the bill of materials (BoM) is a paramount activity in order to manage obsolescence proactively and cost-effectively. This is the reason why it was necessary to undertake a benchmarking study to develop best practice in this process. A total of 22 obsolescence experts from 13 different organisations/projects from across UK and USA have participated in this study. Their current processes and experience have been taken into account in the development of the best practice process for obsolescence risk assessment. The key factors that have to be analysed in the risk assessment process for each component in the BoM are: number of manufacturers, years to end of life, stock available, consumption rate and operational impact criticality. For the very high risk components, a more detailed analysis is required to inform the decisions regarding the most suitable mitigation strategies. On the contrary, for the low risk components, a fully proactive approach is neither appropriate nor cost effective. Therefore, it is advised for these components that obsolescence issues are dealt with reactively. This process has been validated using case studies with several experts from industry and is currently being implemented by the UK Ministry of Defence as technical guidance within the JSP 886 Volume 7 Part 8.13 standards.

  1. Risk Management in Information Technology Project: An Empirical Study

    Directory of Open Access Journals (Sweden)

    Kornelius Irfandhi

    2016-09-01

    Full Text Available The companies are facing some risks due to changes in a dynamic environment. If risks are not managed properly, it will have some negative impacts on the companies at the present and the future. One important function of the Information Technology (IT governance is risk management. Risk management in IT project aims to provide a safe environment for IT projects undertaken. Risk management becomes an important process for the success of IT projects. This article discussed the risk of IT project and whether there was a relationship between risk management and the success of the project. The method used was performing a literature review of several scientific articles which published between 2010 and 2014. The results of this study are the presence of risk management and risk manager influence the success of the project. Risk analysis and risk monitoring and control also have a relationship with the subjective performance of IT projects. If risk management is applied properly, the chance of the success of the projects undertaken can be increased. 

  2. Probabilistic risk assessment of earthquakes at the Rocky Flats Plant and subsequent upgrade to reduce risk

    International Nuclear Information System (INIS)

    Day, S.A.

    1989-01-01

    An analysis to determine the risk associated with earthquakes at the Rocky Flats Plant was performed. Seismic analyses and structural evaluations were used to postulate building and equipment damage and radiological releases to the environment from various magnitudes of earthquakes. Dispersion modeling and dose assessment to the public were then calculated. The frequency of occurrence of various magnitudes of earthquakes were determined from the Department of Energy natural Phenomena Hazards Modeling Project. Risk to the public was probabilistically assessed for each magnitude of earthquake and for overall seismic risk. Based on the results of this Probabilistic Risk Assessment and a cost/benefit analysis, seismic upgrades are being implemented for several plutonium-handling facilities for the purpose of risk reduction

  3. Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach

    Science.gov (United States)

    Lee, Lydia L.; Ingegneri, Antonino J.; Djam, Melody

    2006-01-01

    The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor

  4. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, Johannes I.M.; Keizer, J.A.

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  5. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1994-01-01

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  6. Performance Risks Allocation in Bot Infrastructure in Nigeria: A Case Study of Lagos Infrastructure Project

    Directory of Open Access Journals (Sweden)

    Sanni Gabriel A.

    2017-08-01

    Full Text Available The study assessed allocation, criteria and allotment effectiveness of performance risks in Build- Operate-Transfer (BOT transportation infrastructure in Nigeria using Lagos Infrastructure Project (LIP as a case study. LIP is the only BOT-procured tolled road that has attained ‘operate’ stage of BOT cycle in Nigeria. It revealed that more operating risks were actually allocated to the concessionaire than the grantor and most of the risks were preferred retained by the allottee. Significant fraction of the risks was effectively allocated between the concessionaire and grantor except those that involve close interface between participants. While grantor rated nine risks high and seven risks very high; the concessionaire assessed nine risks to be high and five risks to be very high; the grantor rated the effectiveness level to be seventy three per cent and the concessionaire assessed it to be sixty four per cent. The study recommended that the evolving knowledge from Lagos Infrastructure Project (LIP should be documented to guide future BOT transactions in Nigeria.

  7. Ethics of Risk. Kristin Shrader-Frechette's Philosophical Critique of Risk Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Heikkeroe, Topi [Univ. of Helsinki (Finland). Centre for Social Ethics

    2006-09-15

    This paper addresses risk assessment from a philosophical point of view. It presents and critically reviews the work of Kristin Shrader-Frechette. It introduces the ethical, epistemological, and methodological issues related to risk assessment. The paper focuses on the ethical questions of justice in risk decisions. It opens by framing the relationship between ethics and technology in the modern world. Then the paper turns to a brief description of risk assessment as a central method in technological decision making. It proceeds to show how Shrader-Frechette analyzes ethical and political aspects of risk assessment. The central argumentation In her critique follows RawIsian lines: distributive and participatory inequalities in creating technological constructions need to be justified. To clarify this requirement she formulates the Principle of Prima Facie Political Equity (PPFPE), which is her central tool in most of her ethical criticism, for instance, in relation to the future generations: prima facie. all generations should be treated equally. Brief critical remarks conclude the paper. They touch upon placing Shrader-Frechette's project on the academic chart and her liberal individualist anthropology.

  8. A Hybrid MCDM Technique for Risk Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Kajal Chatterjee

    2018-02-01

    Full Text Available Multi-stakeholder based construction projects are subject to potential risk factors due to dynamic business environment and stakeholders’ lack of knowledge. When solving project management tasks, it is necessary to quantify the main risk indicators of the projects. Managing these requires suitable risk mitigation strategies to evaluate and analyse their severity. The existence of information asymmetry also causes difficulties with achieving Pareto efficiency. Hence, to ensure balanced satisfaction of all participants, risk evaluation of these projects can be considered as an important part of the multi-criteria decision-making (MCDM process. In real-life problems, evaluation of project risks is often uncertain and even incomplete, and the prevailing methodologies fail to handle such situations. To address the problem, this paper extends the analytical network process (ANP methodology in the D numbers domain to handle three types of ambiguous information’s, viz. complete, uncertain, and incomplete, and assesses the weight of risk criteria. The D numbers based approach overcomes the deficiencies of the exclusiveness hypothesis and completeness constraint of Dempster–Shafer (D–S theory. Here, preference ratings of the decision matrix for each decision-maker are determined using a D numbers extended consistent fuzzy preference relation (D-CFPR. An extended multi-attributive border approximation area comparison (MABAC method in D numbers is then developed to rank and select the best alternative risk response strategy. Finally, an illustrative example from construction sector is presented to check the feasibility of the proposed approach. For checking the reliability of alternative ranking, a comparative analysis is performed with different MCDM approaches in D numbers domain. Based on different criteria weights, a sensitivity analysis of obtained ranking of the hybrid D-ANP-MABAC model is performed to verify the robustness of the proposed

  9. Seismic Risk Assessment of Italian Seaports Using GIS

    International Nuclear Information System (INIS)

    Bartolomei, Anna; Corigliano, Mirko; Lai, Carlo G.

    2008-01-01

    Seaports are crucial elements in the export and import of goods and/or on the flow of travellers in the tourism industry of many industrialised nations included Italy. Experience gained from recent earthquakes (e.g. 1989 Loma Prieta in USA, 1995 Hyogoken-Nanbu and 2003 Tokachi-Oki in Japan) have dramatically demonstrated the seismic vulnerability of seaport structures and the severe damage that can be caused by ground shaking. In Italy, the Department of Civil Protection has funded a research project to develop a methodology for the seismic design of new marginal wharves and assessment of existing structures at seaports located in areas of medium or high seismicity. This paper shows part of the results of this research project, currently underway, with particular reference to the seismic risk assessment through an interactive, geographically referenced database (GIS). Standard risk assessment have been carried out for the Gioia Tauro port in Calabria (Italy) using the empirical curves implemented by the National Institute of Building Sciences (NIBS, 2004)

  10. Seismic Risk Assessment of Italian Seaports Using GIS

    Science.gov (United States)

    Bartolomei, Anna; Corigliano, Mirko; Lai, Carlo G.

    2008-07-01

    Seaports are crucial elements in the export and import of goods and/or on the flow of travellers in the tourism industry of many industrialised nations included Italy. Experience gained from recent earthquakes (e.g. 1989 Loma Prieta in USA, 1995 Hyogoken-Nanbu and 2003 Tokachi-Oki in Japan) have dramatically demonstrated the seismic vulnerability of seaport structures and the severe damage that can be caused by ground shaking. In Italy, the Department of Civil Protection has funded a research project to develop a methodology for the seismic design of new marginal wharves and assessment of existing structures at seaports located in areas of medium or high seismicity. This paper shows part of the results of this research project, currently underway, with particular reference to the seismic risk assessment through an interactive, geographically referenced database (GIS). Standard risk assessment have been carried out for the Gioia Tauro port in Calabria (Italy) using the empirical curves implemented by the National Institute of Building Sciences (NIBS, 2004).

  11. Default risk in project finance

    NARCIS (Netherlands)

    Klompjan, R.; Wouters, Marc

    2002-01-01

    Understanding default risk in project finance is relevant to investors. This article investigates which factors are most strongly associated with the occurrence of project finance default, using data from 210 projects, of which 37 were in default. The authors found that the use of proven technology,

  12. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  13. Use of OECD/NEA Data Project Products in Probabilistic Safety Assessment

    International Nuclear Information System (INIS)

    Cherkas, G.; Raducu, Gheorghe; Riznic, J.; Yalaoui, S.; Huang, Hui-Wen; Holy, Jaroslav; Holmberg, Jan-Erik; Sandberg, Jorma; Balmain, Michel; Bonnevialle, Anne-Marie; Curnier, Florence; Georgescu, Gabriel; Lanore, Jeanne-Marie; Lindner, Arndt; Fujimoto, Haruo; Ahn, Kwang-Il; Hwang, Taesuk; Jang, Seung-Cheol; Husarcek, Jan; Kovacs, Zoltan; Vazquez, Teresa; Johanson, Gunnar; Liwaang, Bo; Nyman, Ralph; Dang, Vinh; Schoen, Gerhard; Brook, Kevin; Hamblen, David; Siu, Nathan; Sturzebecher, Karl; Tobin, Margaret; Wood, Jeff; Amri, Abdallah; Breest, Axel

    2014-01-01

    The Nuclear Energy Agency (NEA)/Committee for the Safety of Nuclear Installations' (CSNI) Working Group on Risk Assessment (WGRISK) is tasked with supporting the improved use of Probabilistic Safety Assessment (PSA) in risk informed regulation and safety management through the analysis of results and the development of perspectives regarding potentially important risk contributors and associated risk reduction strategies. The task consists of the following major activities: Development, distribution, and completion of survey questionnaires; Analysis of survey questionnaire results at a task workshop; Preparation of the final task report. The main objectives of this task, as proposed by WGRISK and approved by CSNI, are the following: - Identification and characterization of the current uses of OECD data project products and data in support of PSA. In this context, the term 'products' refers to data analysis results, technical reports, and other project outputs. - Identification and characterization of technical and programmatic characteristics that either support or impede use of data project products in PSA. This includes an assessment of which PSA parameters could be potentially estimated from the various data project products and gaps between available product information and PSA data needs. - Identification of recommendations for enhancing the usefulness of data project products and the coordination between WGRISK and the data projects. This task report consists of the following sections: - Chapter 1 Provides a general overview of motivation and approach used for this task. - Chapter 2 Describes scope and objectives of the task. - Chapter 3 Provides an overview of the ICDE, FIRE, OPDE/CODAP, and COMPSIS data projects. For each project, the project objectives, project history, data collection methodology and quality assurance, project status, example PSA Applications, and information related to project participation is provided. - Chapter 4 Describes the

  14. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  15. Risk assessment of climate systems for national security.

    Energy Technology Data Exchange (ETDEWEB)

    Backus, George A.; Boslough, Mark Bruce Elrick; Brown, Theresa Jean; Cai, Ximing; Conrad, Stephen Hamilton; Constantine, Paul G; Dalbey, Keith R.; Debusschere, Bert J.; Fields, Richard; Hart, David Blaine; Kalinina, Elena Arkadievna; Kerstein, Alan R.; Levy, Michael; Lowry, Thomas Stephen; Malczynski, Leonard A.; Najm, Habib N.; Overfelt, James Robert; Parks, Mancel Jordan; Peplinski, William J.; Safta, Cosmin; Sargsyan, Khachik; Stubblefield, William Anthony; Taylor, Mark A.; Tidwell, Vincent Carroll; Trucano, Timothy Guy; Villa, Daniel L.

    2012-10-01

    Climate change, through drought, flooding, storms, heat waves, and melting Arctic ice, affects the production and flow of resource within and among geographical regions. The interactions among governments, populations, and sectors of the economy require integrated assessment based on risk, through uncertainty quantification (UQ). This project evaluated the capabilities with Sandia National Laboratories to perform such integrated analyses, as they relate to (inter)national security. The combining of the UQ results from climate models with hydrological and economic/infrastructure impact modeling appears to offer the best capability for national security risk assessments.

  16. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  17. RISK MANAGEMENT AUTOMATION OF SOFTWARE PROJECTS BASED ОN FUZZY INFERENCE

    Directory of Open Access Journals (Sweden)

    T. M. Zubkova

    2015-09-01

    Full Text Available Application suitability for one of the intelligent methods for risk management of software projects has been shown based on the review of existing algorithms for fuzzy inference in the field of applied problems. Information sources in the management of software projects are analyzed; major and minor risks are highlighted. The most critical parameters have been singled out giving the possibility to estimate the occurrence of an adverse situations (project duration, the frequency of customer’s requirements changing, work deadlines, experience of developers’ participation in such projects and others.. The method of qualitative fuzzy description based on fuzzy logic has been developed for analysis of these parameters. Evaluation of possible situations and knowledge base formation rely on a survey of experts. The main limitations of existing automated systems have been identified in relation to their applicability to risk management in the software design. Theoretical research set the stage for software system that makes it possible to automate the risk management process for software projects. The developed software system automates the process of fuzzy inference in the following stages: rule base formation of the fuzzy inference systems, fuzzification of input variables, aggregation of sub-conditions, activation and accumulation of conclusions for fuzzy production rules, variables defuzzification. The result of risk management automation process in the software design is their quantitative and qualitative assessment and expert advice for their minimization. Practical significance of the work lies in the fact that implementation of the developed automated system gives the possibility for performance improvement of software projects.

  18. Risk analysis using AS/NZS 4360:2004, Bow-Tie diagram and ALARP on construction projects of Banyumanik Hospital

    Science.gov (United States)

    Sari, Diana Puspita; Pujotomo, Darminto; Wardani, Nadira Kusuma

    2017-11-01

    The Determination of risk is an uncertain event. Risks can have negative or positive impacts on project objectives. A project was defined as a series of activities and tasks that have a purpose, specifications, and limits of cost. Banyumanik Hospital Development Project is one of the construction projects in Semarang which have experienced some problems. The first problem is project delays on building stake. The second problem is delay of material supply. Finally, the problem that occurs is less management attention to health safety as evidenced by the unavailability of PPE for the workers. These problems will pose a risk to be a very important risk management performed by contractors at the Banyumanik Hospital Development Project to reduce the impact that would be caused by the risk borne by the provider of construction services. This research aim to risk identification, risk assessment and risk mitigation. Project risk management begins with the identification of risks based on the project life cycle. The risk assessment carried out by AS I NZS 4360: 2004 to the impacts of cost, time and quality. The results obtained from the method of AS I NZS 4360: 2004 is the risk that requires the handling of mitigation. Mitigated risk is the risk that had significant and high level. There are four risks that require risk mitigation with Bow-Tie diagrams which is work accidents, contract delays, material delays and design changes. Bow-Tie diagram method is a method for identifying causal and preventive action and recovery of a risk. Results obtained from Bow-Tie diagram method is a preventive action and recovery. This action is used as input to the ALARP method. ALARP method is used to determine the priority of the strategy proposed in the category broadly acceptable, tolerable, and unacceptable.

  19. Risk managements' communicative effects influencing IT project success

    NARCIS (Netherlands)

    de Bakker, Karel; Boonstra, Albert; Wortmann, Hans

    The central question of this research is if, and how, risk management contributes to the success of IS/IT projects. Risk management is used regularly in IT projects, despite indications in literature that risk management only occasionally contributes to IT project success. Drawing on Habermas we

  20. Dealing with project complexity by matrix-based propagation modelling for project risk analysis

    OpenAIRE

    Fang , Chao; Marle , Franck

    2012-01-01

    International audience; Engineering projects are facing a growing complexity and are thus exposed to numerous and interdependent risks. In this paper, we present a quantitative method for modelling propagation behaviour in the project risk network. The construction of the network requires the involvement of the project manager and related experts using the Design Structure Matrix (DSM) method. A matrix-based risk propagation model is introduced to calculate risk propagation and thus to re-eva...

  1. Addressing dependability by applying an approach for model-based risk assessment

    International Nuclear Information System (INIS)

    Gran, Bjorn Axel; Fredriksen, Rune; Thunem, Atoosa P.-J.

    2007-01-01

    This paper describes how an approach for model-based risk assessment (MBRA) can be applied for addressing different dependability factors in a critical application. Dependability factors, such as availability, reliability, safety and security, are important when assessing the dependability degree of total systems involving digital instrumentation and control (I and C) sub-systems. In order to identify risk sources their roles with regard to intentional system aspects such as system functions, component behaviours and intercommunications must be clarified. Traditional risk assessment is based on fault or risk models of the system. In contrast to this, MBRA utilizes success-oriented models describing all intended system aspects, including functional, operational and organizational aspects of the target. The EU-funded CORAS project developed a tool-supported methodology for the application of MBRA in security-critical systems. The methodology has been tried out within the telemedicine and e-commerce areas, and provided through a series of seven trials a sound basis for risk assessments. In this paper the results from the CORAS project are presented, and it is discussed how the approach for applying MBRA meets the needs of a risk-informed Man-Technology-Organization (MTO) model, and how methodology can be applied as a part of a trust case development

  2. Addressing dependability by applying an approach for model-based risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Gran, Bjorn Axel [Institutt for energiteknikk, OECD Halden Reactor Project, NO-1751 Halden (Norway)]. E-mail: bjorn.axel.gran@hrp.no; Fredriksen, Rune [Institutt for energiteknikk, OECD Halden Reactor Project, NO-1751 Halden (Norway)]. E-mail: rune.fredriksen@hrp.no; Thunem, Atoosa P.-J. [Institutt for energiteknikk, OECD Halden Reactor Project, NO-1751 Halden (Norway)]. E-mail: atoosa.p-j.thunem@hrp.no

    2007-11-15

    This paper describes how an approach for model-based risk assessment (MBRA) can be applied for addressing different dependability factors in a critical application. Dependability factors, such as availability, reliability, safety and security, are important when assessing the dependability degree of total systems involving digital instrumentation and control (I and C) sub-systems. In order to identify risk sources their roles with regard to intentional system aspects such as system functions, component behaviours and intercommunications must be clarified. Traditional risk assessment is based on fault or risk models of the system. In contrast to this, MBRA utilizes success-oriented models describing all intended system aspects, including functional, operational and organizational aspects of the target. The EU-funded CORAS project developed a tool-supported methodology for the application of MBRA in security-critical systems. The methodology has been tried out within the telemedicine and e-commerce areas, and provided through a series of seven trials a sound basis for risk assessments. In this paper the results from the CORAS project are presented, and it is discussed how the approach for applying MBRA meets the needs of a risk-informed Man-Technology-Organization (MTO) model, and how methodology can be applied as a part of a trust case development.

  3. Risk assessment

    International Nuclear Information System (INIS)

    Kinchin, G.H.

    1983-01-01

    After defining risk and introducing the concept of individual and societal risk, the author considers each of these, restricting considerations to risk of death. Some probabilities of death arising from various causes are quoted, and attention drawn to the care necessary in making comparisons between sets of data and to the distinction between voluntary and involuntary categories and between early and delayed deaths. The presentation of information on societal risk is discussed and examples given. The history of quantified risk assessment is outlined, particularly related to the nuclear industry, the process of assessing risk discussed: identification of hazard causes, the development of accident chains and the use of event trees, the evaluation of probability through the collection of data and their use with fault trees, and the assessment of consequences of hazards in terms of fatalities. Reference is made to the human element and common-made failures, and to studies supporting the development of reliability assessment techniques. Acceptance criteria are discussed for individual and societal risk in the nuclear field, and it is shown that proposed criteria lead to risks conservative by comparison with risks from day-to-day accidents and other potentially hazardous industries. (U.K.)

  4. Social assessment of energy projects. How?

    International Nuclear Information System (INIS)

    Munksgaard, J.; Larsen, A.

    1997-08-01

    This is the final report of the project: Social assessment of Energy Projects. The aim of the project is to improve the basis of working out social assessments of energy projects in practice. The report raises the question: How should social assessments of energy projects be made? A social assessment is using a national perspective, i.e. it accounts the effects of the project for individuals and institutions in Denmark. The assessment is based on economics which means that effects generated by the project are valuated in DKK - as far as possible. The aim of the social assessment is to support a more effective use of the resources in Denmark. A social assessment should include an analysis of the distributional effects. The analysis can be made as an account including a social cash flow analysis. The distribution analysis will illustrate the gains and losses for the different groups of individuals affected carrying out the project. In that way the analysis will show who potentially will support the project and who will be against the project. (EG) EFP-92. 37 refs

  5. A perspective of PC-based probabilistic risk assessment

    International Nuclear Information System (INIS)

    Sattison, M.B.; Rasmuson, D.M.; Robinson, R.C.; Russell, K.D.; Van Siclen, V.S.

    1987-01-01

    Probabilistic risk assessment (PRA) information has been under-utilized in the past due to the large effort required to input the PRA data and the large expense of the computers needed to run PRA codes. The microcomputer-based Integrated Reliability and Risk Analysis System (IRRAS) and the System Analysis and Risk Assessment (SARA) System, under development at the Idaho National Engineering Laboratory, have greatly enhanced the ability of managers to use PRA techniques in their decision-making. IRRAS is a tool that allows an analyst to create, modify, update, and reanalyze a plant PRA to keep the risk assessment current with the plant's configuration and operation. The SARA system is used to perform sensitivity studies on the results of a PRA. This type of analysis can be used to evaluate proposed changes to a plant or its operation. The success of these two software projects demonstrate that risk information can be made readily available to those that need it. This is the first step in the development of a true risk management capability

  6. Risk Assessment Overview

    Science.gov (United States)

    Prassinos, Peter G.; Lyver, John W., IV; Bui, Chinh T.

    2011-01-01

    Risk assessment is used in many industries to identify and manage risks. Initially developed for use on aeronautical and nuclear systems, risk assessment has been applied to transportation, chemical, computer, financial, and security systems among others. It is used to gain an understanding of the weaknesses or vulnerabilities in a system so modification can be made to increase operability, efficiency, and safety and to reduce failure and down-time. Risk assessment results are primary inputs to risk-informed decision making; where risk information including uncertainty is used along with other pertinent information to assist management in the decision-making process. Therefore, to be useful, a risk assessment must be directed at specific objectives. As the world embraces the globalization of trade and manufacturing, understanding the associated risk become important to decision making. Applying risk assessment techniques to a global system of development, manufacturing, and transportation can provide insight into how the system can fail, the likelihood of system failure and the consequences of system failure. The risk assessment can identify those elements that contribute most to risk and identify measures to prevent and mitigate failures, disruptions, and damaging outcomes. In addition, risk associated with public and environment impact can be identified. The risk insights gained can be applied to making decisions concerning suitable development and manufacturing locations, supply chains, and transportation strategies. While risk assessment has been mostly applied to mechanical and electrical systems, the concepts and techniques can be applied across other systems and activities. This paper provides a basic overview of the development of a risk assessment.

  7. Analysis of interactions among barriers in project risk management

    Science.gov (United States)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  8. Non-animal approaches for consumer safety risk assessments: Unilever's scientific research programme.

    Science.gov (United States)

    Carmichael, Paul; Davies, Michael; Dent, Matt; Fentem, Julia; Fletcher, Samantha; Gilmour, Nicola; MacKay, Cameron; Maxwell, Gavin; Merolla, Leona; Pease, Camilla; Reynolds, Fiona; Westmoreland, Carl

    2009-12-01

    Non-animal based approaches to risk assessment are now routinely used for assuring consumer safety for some endpoints (such as skin irritation) following considerable investment in developing and applying new methods over the past 20 years. Unilever's research programme into non-animal approaches for safety assessment is currently focused on the application of new technologies to risk assessments in the areas of skin allergy, cancer and general toxicity (including inhalation toxicity). In all of these areas, a long-term investment is essential to increase the scientific understanding of the underlying biological and chemical processes that we believe will ultimately form a sound basis for novel risk assessment approaches. Our research programme in these priority areas consists of in-house research as well as Unilever-sponsored academic research, involvement with EU-funded projects (e.g. Sens-it-iv, carcinoGENOMICS), participation in cross-industry collaborative research (e.g. COLIPA, EPAA) and ongoing involvement with other scientific initiatives on non-animal approaches to risk assessment (e.g. UK NC3Rs, US 'Human Toxicology Project' consortium). 2009 FRAME.

  9. Principal elements of the Basalt Waste Isolation Project performance assessment studies

    International Nuclear Information System (INIS)

    Baca, R.G.; Wilde, R.T.

    1983-12-01

    In this paper, three of the principal elements of the Basalt Waste Isolation Project (BWIP) performance assessment studies are focused on: (1) development of a methodology for probabilistic risk assessment, (2) performance analyses of repository subsystems, and (3) selection and ranking of disruptive event scenarios. Other elements of the BWIP performance assessment studies are briefly outlined. 12 references, 5 figures

  10. Introduction to risk assessment

    International Nuclear Information System (INIS)

    Raina, V.M.

    2002-01-01

    This paper gives an introduction to risk assessment. It discusses the basic concepts of risk assessment, nuclear risk assessment process and products, the role of risk assessment products in nuclear safety assurance, the relationship between risk assessment and other safety analysis and risk assessment and safe operating envelope

  11. Risk-Informed Assessment Methodology Development and Application

    International Nuclear Information System (INIS)

    Sung Goo Chi; Seok Jeong Park; Chul Jin Choi; Ritterbusch, S.E.; Jacob, M.C.

    2002-01-01

    Westinghouse Electric Company (WEC) has been working with Korea Power Engineering Company (KOPEC) on a US Department of Energy (DOE) sponsored Nuclear Energy Research Initiative (NERI) project through a collaborative agreement established for the domestic NERI program. The project deals with Risk-Informed Assessment (RIA) of regulatory and design requirements of future nuclear power plants. An objective of the RIA project is to develop a risk-informed design process, which focuses on identifying and incorporating advanced features into future nuclear power plants (NPPs) that would meet risk goals in a cost-effective manner. The RIA design methodology is proposed to accomplish this objective. This paper discusses the development of this methodology and demonstrates its application in the design of plant systems for future NPPs. Advanced conceptual plant systems consisting of an advanced Emergency Core Cooling System (ECCS) and Emergency Feedwater System (EFWS) for a NPP were developed and the risk-informed design process was exercised to demonstrate the viability and feasibility of the RIA design methodology. Best estimate Loss-of-Coolant Accident (LOCA) analyses were performed to validate the PSA success criteria for the NPP. The results of the analyses show that the PSA success criteria can be met using the advanced conceptual systems and that the RIA design methodology is a viable and appropriate means of designing key features of risk-significant NPP systems. (authors)

  12. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  13. Cumulative Risk Assessment (CRA): transforming the way we assess health risks.

    Science.gov (United States)

    Williams, Pamela R D; Dotson, G Scott; Maier, Andrew

    2012-10-16

    Human health risk assessments continue to evolve and now focus on the need for cumulative risk assessment (CRA). CRA involves assessing the combined risk from coexposure to multiple chemical and nonchemical stressors for varying health effects. CRAs are broader in scope than traditional chemical risk assessments because they allow for a more comprehensive evaluation of the interaction between different stressors and their combined impact on human health. Future directions of CRA include greater emphasis on local-level community-based assessments; integrating environmental, occupational, community, and individual risk factors; and identifying and implementing common frameworks and risk metrics for incorporating multiple stressors.

  14. Ecological risk assessment of hydropower dam construction based on ecological network analysis

    OpenAIRE

    Chen, Shaoqing; Fath, Brian D.; Chen, Bin

    2010-01-01

    Dam construction is regarded as one of the major factors contributing to significant modifications of the river ecosystems, and the ecological risk (ER) assessment of dam construction has received growing attention in recent years. In the present study, we explored the potential ecological risk caused by dam project based on the general principles of the ecological risk assessment. Ecological network analysis was proposed as the usable analytic method for the implement of ecological risk asse...

  15. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  16. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  17. Risk assessment for SAGD well blowouts

    Energy Technology Data Exchange (ETDEWEB)

    Worth, D.; Alhanati, F.; Lastiwka, M. [C-FER Technologies, Edmonton, AB (Canada); Crepin, S. [Petrocedeno, Caracas (Venezuela)

    2008-10-15

    This paper discussed a steam assisted gravity drainage (SAGD) pilot project currently being conducted in Venezuela's Orinoco Belt. A risk assessment was conducted as part of the pilot program in order to evaluate the use of single barrier completions in conjunction with a blowout response plan. The study considered 3 options: (1) an isolated double barrier completion with a downhole safety valve (DHSV) in the production tubing string and a packer in the production casing annulus; (2) a partially isolated completion with no DHSV and a packer in the production casing annulus; and (3) an open single barrier completion with no additional downhole barriers. A reservoir model was used to assess the blowout flowing potential of SAGD well pairs. The probability of a blowout was estimated using fault tree analysis techniques. Risk was determined for various blowout scenarios, including blowouts during normal and workover operations, as well as blowouts through various flow paths. Total risk for each completion scenario was also determined at 3 different time periods within the production life of the well pair. The possible consequences of a blowout were assessed using quantitative consequence models. Results of the study showed that environmental and economic risks were much higher for the open completion technique. Higher risks were also associated with the earlier life of the completion strings. 20 refs., 3 tabs., 19 figs.

  18. Caries risk assessment in young adults

    DEFF Research Database (Denmark)

    Petersson, Gunnel Hänsel; Twetman, Svante

    2015-01-01

    BACKGROUND: To validate baseline caries risk classifications according to the Cariogram model with the actual caries development over a 3-year period in a group of young adults living in Sweden. METHODS: The study group consisted of 1,295 19-year-old patients that completed a comprehensive clinical...... baseline examination, including radiographs and salivary tests. An individual caries risk profile was computed and the patient was placed in one of five risk categories. After 3 years, 982 patients (75.8%) were re-examined and caries increment for each patient was calculated. The outcome was expressed...... as sensitivity, specificity and predictive values and compared with a risk assessment scheme used in Public Dental Service. RESULTS: The drop-outs displayed more risk factors and a significantly higher caries burden at baseline compared with those that remained in the project (p 

  19. Risk assessment of hazardous waste transport - perspectives of GIS application

    International Nuclear Information System (INIS)

    Lazar, R.E.; Dumitrescu, M.; Stefanescu, I.

    2001-01-01

    Due to the increasing public awareness of the potential risks associated with waste transport, the environmental impact assessment of this activity has become an issue of major importance. This paper presents a project proposal, which can establish a national action plan for waste transport evaluation. Such a programme is sustained by the necessity to obtain an adequate method for the rapid and efficient estimation of individual and social risks due to the transport of hazardous substances in Romania. The main objective is to develop regional strategies for risk assessment in comprising: establishing the areas that must be investigated and their particular characteristics; identifying the transport activities in the areas; determining hazards; establishing the analysis criteria and prioritizing the study areas; evaluating continuous emissions; studying major accidents; studying population health; classifying the risks; establishing regional strategies; implementing political and regulatory measures. The project expectation is to provide a decision tool for risk managers and authorities in order to control or limit transportation and the storage of hazardous substances.(author)

  20. Risk Management for New Product Development Projects in Food Industry

    Directory of Open Access Journals (Sweden)

    Porananond, D.

    2014-07-01

    Full Text Available Project risk management provides a guideline for decision making in new product development (NPD projects, reducing uncertainty and increasing success rate. However, the acceptance of formal risk management applications in industry, especially for NPD projects is still in question. A study of a food conglomerate in Thailand found that only 9% of NPD projects used a systematic approach for managing risk. 61% of the projects realised the importance of risk management, while the remaining 30% did not involve risk management at all. This study aims to develop a risk management model for NPD projects in the food industry. The first section of this paper reviews the literature on risk management theory, including international standards for risk and project management (ISO31000 and ISO21500, publications for the Project Management Body of Knowledge (PMBOK, by a professional organisation the Project Management Institute (PMI, and also academic research. 182 academic papers, published between January 2002 and August 2012 were selected. The second part interviews conducted with eight NPD experts from five of the major food manufacturers in Thailand to examine their risk management practices and problems. Conclusions are made on five topics : classification of research method, project type and industrial segment, distribution of articles by region, tools & techniques for risk management and risk factors in projects. Specific requirements of risk management for NPD projects in the food industry are identified. A risk management model and the concept of risk management applications for the food industry are proposed.

  1. Risk assessment of river-type hydropower plants using fuzzy logic approach

    Energy Technology Data Exchange (ETDEWEB)

    Kucukali, Serhat, E-mail: kucukali@cankaya.edu.tr [Civil Engineering Department, Cankaya University, Balgat 06530, Ankara (Turkey)

    2011-10-15

    In this paper, a fuzzy rating tool was developed for river-type hydropower plant projects, and risk assessment and expert judgments were utilized instead of probabilistic reasoning. The methodology is a multi-criteria decision analysis, which provides a flexible and easily understood way to analyze project risks. The external risks, which are partly under the control of companies, were considered in the model. A total of eleven classes of risk factors were determined based on the expert interviews, field studies and literature review as follows: site geology, land use, environmental issues, grid connection, social acceptance, macroeconomic, natural hazards, change of laws and regulations, terrorism, access to infrastructure and revenue. The relative importance of risk factors was determined from the survey results. The survey was conducted with the experts that have experience in the construction of river-type hydropower schemes. The survey results revealed that the site geology and environmental issues were considered as the most important risks. The new risk assessment method enabled a Risk Index (R) value to be calculated, establishing a 4-grade evaluation system. The proposed risk analysis will give investors a more rational basis to make decisions and it can prevent cost and schedule overruns. - Highlights: > A new methodology is proposed for risk rating of river-type hydropower plant projects. > The relative importance of the risk factors was determined from the expert judgments. > The most concerned risks have been found as environmental issues and site geology. > The proposed methodology was tested on a real case. > The proposed risk analysis will give investors a more rational basis.

  2. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  3. The longevity risk of the Dutch Actuarial Association’s projection model

    NARCIS (Netherlands)

    F. Peters (Frederick); W.J. Nusselder (Wilma); J.P. Mackenbach (Johan)

    2012-01-01

    markdownabstractAccurate assessment of the risk that arises from further increases in life expectancy is crucial for the financial sector, in particular for pension funds and life insurance companies. The Dutch Actuarial Association presented a revised projection model in 2010, while in the same

  4. Clean development mechanism projects and portfolio risks

    International Nuclear Information System (INIS)

    Matsuhashi, Ryuji; Fujisawa, Sei; Mitamura, Wataru; Momobayashi, Yutaka; Yoshida, Yoshikuni

    2004-01-01

    Clean development mechanism (CDM) is expected to facilitate technology transfer from developed to developing countries as well as to economically reduce greenhouse gas emissions. In this article, we explore effective institutions to activate CDM projects. For this purpose, we have estimated internal rate of return (IRR) and other indicators on profitability for 42 CDM or JI projects, taking account of volatilities in the price of certified emission reductions (CER). As a result of Monte Carlo simulations, expected values and standard deviations in the IRR of the projects were quantitatively shown. Then we evaluated various risks in CDM, concluding that diversification of investment is an effective way to suppress these risks. Therefore securitization of CDM finance is proposed as a means of facilitating the diversification of investment. Namely, we present the concept of a CDM bond, which is a project bond with CER. We also investigated the role of governments to suppress risks in CDM. Referring to CERUPT, initiated by the Netherlands' government, the institution of 'insured CERUPT' is proposed to suppress downside risks in the IRR of the projects. We concluded that it is possible to make CDM projects viable by the 'insured CERUPT' and CDM bond

  5. A risk assessment tool applied to the study of shale gas resources

    Energy Technology Data Exchange (ETDEWEB)

    Veiguela, Miguel [Mining, Energy and Materials Engineering School, University of Oviedo (Spain); Hurtado, Antonio; Eguilior, Sonsoles; Recreo, Fernando [Environment Department, CIEMAT, Madrid (Spain); Roqueñi, Nieves [Mining, Energy and Materials Engineering School, University of Oviedo (Spain); Loredo, Jorge, E-mail: jloredo@uniovi.es [Mining, Energy and Materials Engineering School, University of Oviedo (Spain)

    2016-11-15

    The implementation of a risk assessment tool with the capacity to evaluate the risks for health, safety and the environment (HSE) from extraction of non-conventional fossil fuel resources by the hydraulic fracturing (fracking) technique can be a useful tool to boost development and progress of the technology and winning public trust and acceptance of this. At the early project stages, the lack of data related the selection of non-conventional gas deposits makes it difficult the use of existing approaches to risk assessment of fluids injected into geologic formations. The qualitative risk assessment tool developed in this work is based on the approach that shale gas exploitation risk is dependent on both the geologic site and the technological aspects. It follows from the Oldenburg's ‘Screening and Ranking Framework (SRF)’ developed to evaluate potential geologic carbon dioxide (CO{sub 2}) storage sites. These two global characteristics: (1) characteristics centered on the natural aspects of the site and (2) characteristics centered on the technological aspects of the Project, have been evaluated through user input of Property values, which define Attributes, which define the Characteristics. In order to carry out an individual evaluation of each of the characteristics and the elements of the model, the tool has been implemented in a spreadsheet. The proposed model has been applied to a site with potential for the exploitation of shale gas in Asturias (northwestern Spain) with tree different technological options to test the approach. - Highlights: • The proposed methodology is a risk assessment useful tool for shale gas projects. • The tool is addressed to the early stages of decision making processes. • The risk assessment of a site is made through a qualitative estimation. • Different weights are assigned to each specific natural and technological property. • The uncertainty associated to the current knowledge is considered.

  6. A risk assessment tool applied to the study of shale gas resources

    International Nuclear Information System (INIS)

    Veiguela, Miguel; Hurtado, Antonio; Eguilior, Sonsoles; Recreo, Fernando; Roqueñi, Nieves; Loredo, Jorge

    2016-01-01

    The implementation of a risk assessment tool with the capacity to evaluate the risks for health, safety and the environment (HSE) from extraction of non-conventional fossil fuel resources by the hydraulic fracturing (fracking) technique can be a useful tool to boost development and progress of the technology and winning public trust and acceptance of this. At the early project stages, the lack of data related the selection of non-conventional gas deposits makes it difficult the use of existing approaches to risk assessment of fluids injected into geologic formations. The qualitative risk assessment tool developed in this work is based on the approach that shale gas exploitation risk is dependent on both the geologic site and the technological aspects. It follows from the Oldenburg's ‘Screening and Ranking Framework (SRF)’ developed to evaluate potential geologic carbon dioxide (CO_2) storage sites. These two global characteristics: (1) characteristics centered on the natural aspects of the site and (2) characteristics centered on the technological aspects of the Project, have been evaluated through user input of Property values, which define Attributes, which define the Characteristics. In order to carry out an individual evaluation of each of the characteristics and the elements of the model, the tool has been implemented in a spreadsheet. The proposed model has been applied to a site with potential for the exploitation of shale gas in Asturias (northwestern Spain) with tree different technological options to test the approach. - Highlights: • The proposed methodology is a risk assessment useful tool for shale gas projects. • The tool is addressed to the early stages of decision making processes. • The risk assessment of a site is made through a qualitative estimation. • Different weights are assigned to each specific natural and technological property. • The uncertainty associated to the current knowledge is considered.

  7. Induced seismicity and carbon storage: Risk assessment and mitigation strategies

    Energy Technology Data Exchange (ETDEWEB)

    White, Joshua A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Foxall, William [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Bachmann, Corinne [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Chiaramonte, Laura [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Daley, Thomas M. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-01-28

    Geologic carbon storage (GCS) is widely recognized as an important strategy to reduce atmospheric carbon dioxide (CO2) emissions. Like all technologies, however, sequestration projects create a number of potential environmental and safety hazards that must be addressed. These include earthquakes—from microseismicity to large, damaging events—that can be triggered by altering pore-pressure conditions in the subsurface. To date, measured seismicity due to CO2 injection has been limited to a few modest events, but the hazard exists and must be considered. There are important similarities between CO2 injection and fluid injection from other applications that have induced significant events—e.g. geothermal systems, waste-fluid injection, hydrocarbon extraction, and others. There are also important distinctions among these technologies that should be considered in a discussion of seismic hazard. This report focuses on strategies for assessing and mitigating risk during each phase of a CO2 storage project. Four key risks related to fault reactivation and induced seismicity were considered. Induced slip on faults could potentially lead to: (1) infrastructure damage, (2) a public nuisance, (3) brine-contaminated drinking water, and (4) CO2-contaminated drinking water. These scenarios lead to different types of damage—to property, to drinking water quality, or to the public welfare. Given these four risks, this report focuses on strategies for assessing (and altering) their likelihoods of occurrence and the damage that may result. This report begins with an overview of the basic physical mechanisms behind induced seismicity. This science basis—and its gaps—is crucial because it forms the foundation for risk assessment and mitigation. Available techniques for characterizing and monitoring seismic behavior are also described. Again, this technical basis—and its limitations—must be factored into the risk

  8. New approaches in human health risk assessment.

    Science.gov (United States)

    Abass, Khaled; Carlsen, Anders; Rautio, Arja

    2016-01-01

    Studies on the precise impact of environmental pollutants on human health are difficult to undertake and interpret, because many genetic and environmental factors influence health at the same time and to varying degrees. Our chapter in the AMAP report was based on new approaches to describe risks and future needs. In this paper, we will introduce the issues associated with risk assessment of single chemicals, and present suggestions for future studies as well as a summary of lessons learned during the health-related parts of the European Union-funded FP7 project ArcRisk (Arctic Health Risks: Impacts on health in the Arctic and Europe owing to climate-induced changes in contaminant cycling, 2009-2014; www.arcrisk.eu).

  9. Weighted normalized risk factor for floods risk assessment

    Directory of Open Access Journals (Sweden)

    Ashraf Mohamed Elmoustafa

    2012-12-01

    Full Text Available Multi Criteria Analysis (MCA describes any structured approach used to determine overall preferences among alternative options, where options accomplish certain or several objectives. The flood protection of properties is a highly important issue due to the damage, danger and other hazards associated to it to human life, properties, and environment. To determine the priority of execution of protection works for any project, many aspects should be considered in order to decide the areas to start the data collection and analysis with. Multi criteria analysis techniques were tested and evaluated for the purpose of flood risk assessment, hydro-morphological parameters were used in this analysis. Finally a suitable technique was chosen and tested to be adopted as a mark of flood risk level and results were presented.

  10. Decision-Making for Systemic Water Risks: Insights From a Participatory Risk Assessment Process in Vietnam

    Science.gov (United States)

    Wyrwoll, Paul R.; Grafton, R. Quentin; Daniell, Katherine A.; Chu, Hoang Long; Ringler, Claudia; Lien, Le Thi Ha; Khoi, Dang Kim; Do, Thang Nam; Tuan, Nguyen Do Anh

    2018-03-01

    Systemic threats to food-energy-environment-water systems require national policy responses. Yet complete control of these complex systems is impossible and attempts to mitigate systemic risks can generate unexpected feedback effects. Perverse outcomes from national policy can emerge from the diverse responses of decision-makers across different levels and scales of resource governance. Participatory risk assessment processes can help planners to understand subnational dynamics and ensure that policies do not undermine the resilience of social-ecological systems and infrastructure networks. Researchers can play an important role in participatory processes as both technical specialists and brokers of stakeholder knowledge on the feedbacks generated by systemic risks and policy decisions. Here, we evaluate the use of causal modeling and participatory risk assessment to develop national policy on systemic water risks. We present an application of the Risks and Options Assessment for Decision-Making (ROAD) process to a district of Vietnam where national agricultural water reforms are being piloted. The methods and results of this project provide general insights about how to support resilient decision-making, including the transfer of knowledge across administrative levels, identification of feedback effects, and the effective implementation of risk assessment processes.

  11. Integrated health and environmental risk assessment and risk management in large industrial areas. Case study Zagreb (CSZ). Final report for 1992

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-07-01

    This report is the result of the Phase 1 of the research within the Case Study Zagreb co-financed by the IAEA according to the project YUG/9/029. The basic long term aim of the project is the reduction in hazards to human health and to the environment in the area of Zagreb. This project is about risk assessment and risk management to achieve the environment protection goals.

  12. Integrated health and environmental risk assessment and risk management in large industrial areas. Case study Zagreb (CSZ). Final report for 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report is the result of the Phase 1 of the research within the Case Study Zagreb co-financed by the IAEA according to the project YUG/9/029. The basic long term aim of the project is the reduction in hazards to human health and to the environment in the area of Zagreb. This project is about risk assessment and risk management to achieve the environment protection goals

  13. Operational risk assessment.

    Science.gov (United States)

    McKim, Vicky L

    2017-06-01

    In the world of risk management, which encompasses the business continuity disciplines, many types of risk require evaluation. Financial risk is most often the primary focus, followed by product and market risks. Another critical area, which typically lacks a thorough review or may be overlooked, is operational risk. This category encompasses many risk exposure types including those around building structures and systems, environmental issues, nature, neighbours, clients, regulatory compliance, network, data security and so on. At times, insurance carriers will assess internal hazards, but seldom do these assessments include more than a cursory look at other types of operational risk. In heavily regulated environments, risk assessments are required but may not always include thorough assessments of operational exposures. Vulnerabilities may linger or go unnoticed, only to become the catalyst for a business disruption at a later time, some of which are so severe that business recovery becomes nearly impossible. Businesses may suffer loss of clients as the result of a prolonged disruption of services. Comprehensive operational risk assessments can assist in identifying such vulnerabilities, exposures and threats so that the risk can be minimised or removed. This paper lays out how an assessment of this type can be successfully conducted.

  14. Risk Management in Complex Construction Projects that Apply Renewable Energy Sources: A Case Study of the Realization Phase of the Energis Educational and Research Intelligent Building

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.

  15. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  16. A systematic risk management approach employed on the CloudSat project

    Science.gov (United States)

    Basilio, R. R.; Plourde, K. S.; Lam, T.

    2000-01-01

    The CloudSat Project has developed a simplified approach for fault tree analysis and probabilistic risk assessment. A system-level fault tree has been constructed to identify credible fault scenarios and failure modes leading up to a potential failure to meet the nominal mission success criteria.

  17. Presentation and analysis of a general algorithm for risk-assessment on secondary poisoning

    NARCIS (Netherlands)

    Romijn CAFM; Luttik R; van de Meent D; Slooff W; Canton JH

    1991-01-01

    The study in this report was carried out in the frame of the project "Evaluation system for new chemical substances". The aim of the study was to present a general algorithm for risk-assessment on secondary poisoning of birds and mammals. Risk-assessment on secondary poisoning can be an

  18. Merging Remote Sensing and Socioeconomic Data to Improve Disaster Risk Assessment

    Science.gov (United States)

    Yetman, G.; Chen, R. S.; Huyck, C. K.

    2015-12-01

    Natural disasters disproportionately impact developing country economies while also impacting business operations for multi-national corporations that rely on supplies and manufacturing in affected areas. Understanding natural hazard risk is only a first step towards preparedness and mitigation—data on facilities, transportation, critical infrastructure, and populations that may be exposed to disasters is required to plan for events and properly assess risks. Detailed exposure data can be used in models to predict casualty rates, aggregate estimates of building damage or destruction, impacts on business operations, and the scale of recovery efforts required. These model outputs are useful for disaster preparedness planning by national and international organizations, as well as for corporations and the reinsurance industry seeking to better understand their risk exposure. Many of these data are lacking for developing countries. Rapid assessment in areas with minimal data for disaster modeling is possible by combing remote sensing data, sample data on construction methods, facility and critical infrastructure data, and economic and demographic census information. This presentation focuses on the methods used to fuse the physical and socioeconomic data by presenting the results from two projects. The first project seeks to improve earthquake risk assessments in Asia using for the reinsurance industry, while the second project builds an integrated exposure database across five countries in Africa for use by international development organizations.

  19. Guidance for addressing the Australian Weed Risk Assessment questions

    Czech Academy of Sciences Publication Activity Database

    Gordon, D. R.; Mitterdorfer, B.; Pheloung, P. C.; Ansari, S.; Buddehagen, C.; Chimera, C.; Daehler, C. C.; Dawson, G.; Denslow, J. S.; La Rosa, A. M.; Nishida, T.; Onderdonk, D. A.; Panetta, F. D.; Pyšek, Petr; Randall, R. P.; Richardson, D. M.; Tshidada, N. J.; Virtue, J. G.; Williams, P. A.

    2010-01-01

    Roč. 25, č. 2 (2010), s. 56-74 ISSN 0815-2195 R&D Projects: GA MŠk 7E09053 Institutional research plan: CEZ:AV0Z60050516 Keywords : plant invasions * risk assessment * prevention Subject RIV: EF - Botanics

  20. NASA Human System Risk Assessment Process

    Science.gov (United States)

    Francisco, D.; Romero, E.

    2016-01-01

    NASA utilizes an evidence based system to perform risk assessments for the human system for spaceflight missions. The center of this process is the multi-disciplinary Human System Risk Board (HSRB). The HSRB is chartered from the Chief Health and Medical Officer (OCHMO) at NASA Headquarters. The HSRB reviews all human system risks via an established comprehensive risk and configuration management plan based on a project management approach. The HSRB facilitates the integration of human research (terrestrial and spaceflight), medical operations, occupational surveillance, systems engineering and many other disciplines in a comprehensive review of human system risks. The HSRB considers all factors that influence human risk. These factors include pre-mission considerations such as screening criteria, training, age, sex, and physiological condition. In mission factors such as available countermeasures, mission duration and location and post mission factors such as time to return to baseline (reconditioning), post mission health screening, and available treatments. All of the factors influence the total risk assessment for each human risk. The HSRB performed a comprehensive review of all potential inflight medical conditions and events and over the course of several reviews consolidated the number of human system risks to 30, where the greatest emphasis is placed for investing program dollars for risk mitigation. The HSRB considers all available evidence from human research and, medical operations and occupational surveillance in assessing the risks for appropriate mitigation and future work. All applicable DRMs (low earth orbit for 6 and 12 months, deep space for 30 days and 1 year, a lunar mission for 1 year, and a planetary mission for 3 years) are considered as human system risks are modified by the hazards associated with space flight such as microgravity, exposure to radiation, distance from the earth, isolation and a closed environment. Each risk has a summary

  1. Risk assessment of river-type hydropower plants using fuzzy logic approach

    International Nuclear Information System (INIS)

    Kucukali, Serhat

    2011-01-01

    In this paper, a fuzzy rating tool was developed for river-type hydropower plant projects, and risk assessment and expert judgments were utilized instead of probabilistic reasoning. The methodology is a multi-criteria decision analysis, which provides a flexible and easily understood way to analyze project risks. The external risks, which are partly under the control of companies, were considered in the model. A total of eleven classes of risk factors were determined based on the expert interviews, field studies and literature review as follows: site geology, land use, environmental issues, grid connection, social acceptance, macroeconomic, natural hazards, change of laws and regulations, terrorism, access to infrastructure and revenue. The relative importance of risk factors was determined from the survey results. The survey was conducted with the experts that have experience in the construction of river-type hydropower schemes. The survey results revealed that the site geology and environmental issues were considered as the most important risks. The new risk assessment method enabled a Risk Index (R) value to be calculated, establishing a 4-grade evaluation system. The proposed risk analysis will give investors a more rational basis to make decisions and it can prevent cost and schedule overruns. - Highlights: → A new methodology is proposed for risk rating of river-type hydropower plant projects. → The relative importance of the risk factors was determined from the expert judgments. → The most concerned risks have been found as environmental issues and site geology. → The proposed methodology was tested on a real case. → The proposed risk analysis will give investors a more rational basis.

  2. Hepatitis Risk Assessment

    Science.gov (United States)

    ... please visit this page: About CDC.gov . Hepatitis Risk Assessment Recommend on Facebook Tweet Share Compartir Viral Hepatitis. Are you at risk? Take this 5 minute Hepatitis Risk Assessment developed ...

  3. Stored CO2 and Methane Leakage Risk Assessment and Monitoring Tool Development: CO2 Capture Project Phase 2 (CCP2)

    Energy Technology Data Exchange (ETDEWEB)

    Dan Kieki

    2008-09-30

    The primary project goal is to develop and test tools for optimization of ECBM recovery and geologic storage of CO{sub 2} in coalbeds, in addition to tools for monitoring CO{sub 2} sequestration in coalbeds to support risk assessment. Three critical topics identified are (1) the integrity of coal bed methane geologic and engineered systems, (2) the optimization of the coal bed storage process, and (3) reliable monitoring and verification systems appropriate to the special conditions of CO{sub 2} storage and flow in coals.

  4. Estimation of Uncertainty in Risk Assessment of Hydrogen Applications

    DEFF Research Database (Denmark)

    Markert, Frank; Krymsky, V.; Kozine, Igor

    2011-01-01

    Hydrogen technologies such as hydrogen fuelled vehicles and refuelling stations are being tested in practice in a number of projects (e.g. HyFleet-Cute and Whistler project) giving valuable information on the reliability and maintenance requirements. In order to establish refuelling stations the ...... probability and the NUSAP concept to quantify uncertainties of new not fully qualified hydrogen technologies and implications to risk management.......Hydrogen technologies such as hydrogen fuelled vehicles and refuelling stations are being tested in practice in a number of projects (e.g. HyFleet-Cute and Whistler project) giving valuable information on the reliability and maintenance requirements. In order to establish refuelling stations...... the permitting authorities request qualitative and quantitative risk assessments (QRA) to show the safety and acceptability in terms of failure frequencies and respective consequences. For new technologies not all statistical data might be established or are available in good quality causing assumptions...

  5. Network theory-based analysis of risk interactions in large engineering projects

    International Nuclear Information System (INIS)

    Fang, Chao; Marle, Franck; Zio, Enrico; Bocquet, Jean-Claude

    2012-01-01

    This paper presents an approach based on network theory to deal with risk interactions in large engineering projects. Indeed, such projects are exposed to numerous and interdependent risks of various nature, which makes their management more difficult. In this paper, a topological analysis based on network theory is presented, which aims at identifying key elements in the structure of interrelated risks potentially affecting a large engineering project. This analysis serves as a powerful complement to classical project risk analysis. Its originality lies in the application of some network theory indicators to the project risk management field. The construction of the risk network requires the involvement of the project manager and other team members assigned to the risk management process. Its interpretation improves their understanding of risks and their potential interactions. The outcomes of the analysis provide a support for decision-making regarding project risk management. An example of application to a real large engineering project is presented. The conclusion is that some new insights can be found about risks, about their interactions and about the global potential behavior of the project. - Highlights: ► The method addresses the modeling of complexity in project risk analysis. ► Network theory indicators enable other risks than classical criticality analysis to be highlighted. ► This topological analysis improves project manager's understanding of risks and risk interactions. ► This helps project manager to make decisions considering the position in the risk network. ► An application to a real tramway implementation project in a city is provided.

  6. Research on Risk Evaluation of Transnational Power Networking Projects Based on the Matter-Element Extension Theory and Granular Computing

    Directory of Open Access Journals (Sweden)

    Jinying Li

    2017-10-01

    Full Text Available In project management, risk assessment is crucial for stakeholders to identify the risk factors during the whole life cycle of the project. A risk evaluation index system of a transnational networking project, which provides an effective way for the grid integration of clean electricity and the sustainable development of the power industry, is constructed in this paper. Meanwhile, a combination of granular computing and order relation analysis (G1 method is applied to determine the weight of each indicator and the matter-element extension evaluation model is also employed to seek the global optimal decision during the risk assessment. Finally, a case study is given to validate the index system and evaluation model established in this paper by assessing two different investment schemes of a transnational high voltage direct current (HVDC transmission project. The result shows that the comprehensive risk level of Scheme 1 is “Low” and the level of Scheme 2 is “General”, which means Scheme 1 is better for the stakeholders from the angle of risk control. The main practical significance of this paper lies in that it can provide a reference and decision support for the government’s power sectors, investment companies and other stakeholders when carrying out related activities.

  7. New approaches in human health risk assessment

    Directory of Open Access Journals (Sweden)

    Khaled Abass

    2016-12-01

    Full Text Available Studies on the precise impact of environmental pollutants on human health are difficult to undertake and interpret, because many genetic and environmental factors influence health at the same time and to varying degrees. Our chapter in the AMAP report was based on new approaches to describe risks and future needs. In this paper, we will introduce the issues associated with risk assessment of single chemicals, and present suggestions for future studies as well as a summary of lessons learned during the health-related parts of the European Union-funded FP7 project ArcRisk (Arctic Health Risks: Impacts on health in the Arctic and Europe owing to climate-induced changes in contaminant cycling, 2009–2014; www.arcrisk.eu.

  8. A risk assessment methodology for incorporating uncertainties using fuzzy concepts

    International Nuclear Information System (INIS)

    Cho, Hyo-Nam; Choi, Hyun-Ho; Kim, Yoon-Bae

    2002-01-01

    This paper proposes a new methodology for incorporating uncertainties using fuzzy concepts into conventional risk assessment frameworks. This paper also introduces new forms of fuzzy membership curves, designed to consider the uncertainty range that represents the degree of uncertainties involved in both probabilistic parameter estimates and subjective judgments, since it is often difficult or even impossible to precisely estimate the occurrence rate of an event in terms of one single crisp probability. It is to be noted that simple linguistic variables such as 'High/Low' and 'Good/Bad' have the limitations in quantifying the various risks inherent in construction projects, but only represent subjective mental cognition adequately. Therefore, in this paper, the statements that include some quantification with giving specific value or scale, such as 'Close to any value' or 'Higher/Lower than analyzed value', are used in order to get over the limitations. It may be stated that the proposed methodology will be very useful for the systematic and rational risk assessment of construction projects

  9. GM Risk Assessment

    Science.gov (United States)

    Sparrow, Penny A. C.

    GM risk assessments play an important role in the decision-making process surrounding the regulation, notification and permission to handle Genetically Modified Organisms (GMOs). Ultimately the role of a GM risk assessment will be to ensure the safe handling and containment of the GMO; and to assess any potential impacts on the environment and human health. A risk assessment should answer all ‘what if’ scenarios, based on scientific evidence.

  10. Patient safety in external beam radiotherapy, results of the ACCIRAD project: Current status of proactive risk assessment, reactive analysis of events, and reporting and learning systems in Europe.

    Science.gov (United States)

    Malicki, Julian; Bly, Ritva; Bulot, Mireille; Godet, Jean-Luc; Jahnen, Andreas; Krengli, Marco; Maingon, Philippe; Prieto Martin, Carlos; Przybylska, Kamila; Skrobała, Agnieszka; Valero, Marc; Jarvinen, Hannu

    2017-04-01

    To describe the current status of implementation of European directives for risk management in radiotherapy and to assess variability in risk management in the following areas: 1) in-country regulatory framework; 2) proactive risk assessment; (3) reactive analysis of events; and (4) reporting and learning systems. The original data were collected as part of the ACCIRAD project through two online surveys. Risk assessment criteria are closely associated with quality assurance programs. Only 9/32 responding countries (28%) with national regulations reported clear "requirements" for proactive risk assessment and/or reactive risk analysis, with wide variability in assessment methods. Reporting of adverse error events is mandatory in most (70%) but not all surveyed countries. Most European countries have taken steps to implement European directives designed to reduce the probability and magnitude of accidents in radiotherapy. Variability between countries is substantial in terms of legal frameworks, tools used to conduct proactive risk assessment and reactive analysis of events, and in the reporting and learning systems utilized. These findings underscore the need for greater harmonisation in common terminology, classification and reporting practices across Europe to improve patient safety and to enable more reliable inter-country comparisons. Copyright © 2017 Elsevier B.V. All rights reserved.

  11. The Risks of Investments in Transport Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    O. Pokorná

    2002-01-01

    Full Text Available Investment decisions should not be taken without an in-depth analysis of the risks. This is an important stage in project preparation and should be performed simultaneously with the planning of the financial operations. Infrastructure development requires that project risks and responsibilities be assigned to the public or private entity that is best able to manage them. The risks and their financial impacts are usually not quantified equally by all parties. Each party views the given risks according to the guarantees provided. These guarantees are related to the form of participation in the project.

  12. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  13. Comprehensive, Quantitative Risk Assessment of CO{sub 2} Geologic Sequestration

    Energy Technology Data Exchange (ETDEWEB)

    Lepinski, James

    2013-09-30

    A Quantitative Failure Modes and Effects Analysis (QFMEA) was developed to conduct comprehensive, quantitative risk assessments on CO{sub 2} capture, transportation, and sequestration or use in deep saline aquifers, enhanced oil recovery operations, or enhanced coal bed methane operations. The model identifies and characterizes potential risks; identifies the likely failure modes, causes, effects and methods of detection; lists possible risk prevention and risk mitigation steps; estimates potential damage recovery costs, mitigation costs and costs savings resulting from mitigation; and ranks (prioritizes) risks according to the probability of failure, the severity of failure, the difficulty of early failure detection and the potential for fatalities. The QFMEA model generates the necessary information needed for effective project risk management. Diverse project information can be integrated into a concise, common format that allows comprehensive, quantitative analysis, by a cross-functional team of experts, to determine: What can possibly go wrong? How much will damage recovery cost? How can it be prevented or mitigated? What is the cost savings or benefit of prevention or mitigation? Which risks should be given highest priority for resolution? The QFMEA model can be tailored to specific projects and is applicable to new projects as well as mature projects. The model can be revised and updated as new information comes available. It accepts input from multiple sources, such as literature searches, site characterization, field data, computer simulations, analogues, process influence diagrams, probability density functions, financial analysis models, cost factors, and heuristic best practices manuals, and converts the information into a standardized format in an Excel spreadsheet. Process influence diagrams, geologic models, financial models, cost factors and an insurance schedule were developed to support the QFMEA model. Comprehensive, quantitative risk assessments

  14. Survey on the Technology Readiness Level of R and D projects for a Technical Risk Management

    International Nuclear Information System (INIS)

    Song, S. J.; Chang, J.; Lee, K. Y.

    2008-01-01

    The purpose of applying the Technology Readiness Level/Design Readiness Level (TRL/DRL) in technical risk management is to make technology assessments, and improve communication among researchers with a consistent, systematic technology readiness Technical risk management for the Nuclear Hydrogen Production project was adopted of experience assessed with Delphi Method from the Next Generation Nuclear Plant(NGNP)of the DOE to improve the poor contactor management of the major projects which experienced cost increases and/or schedule delays in long-term. In the current phase that is doing key technology research and development projects, the technology readiness level was reviewed and applied to the Nuclear Hydrogen Production project to prepare an input for the next design phases. Based on the previous works, pre-conceptional design and key R and D works for the Nuclear Hydrogen Design and Development(NHDD) projects and the results of key research and development projects, the TRL was applied to assess the levels and compared with the advanced design stages of Westinghouse Electric Co. With this process, several issues were identified to apply the design and technology level to the familiar steps of design process and research and development projects. In order to resolve these issues, it is needed to systematically adjust and modify the current process with TRLs

  15. Flood Risk Assessment Based On Security Deficit Analysis

    Science.gov (United States)

    Beck, J.; Metzger, R.; Hingray, B.; Musy, A.

    Risk is a human perception: a given risk may be considered as acceptable or unac- ceptable depending on the group that has to face that risk. Flood risk analysis of- ten estimates economic losses from damages, but neglects the question of accept- able/unacceptable risk. With input from land use managers, politicians and other stakeholders, risk assessment based on security deficit analysis determines objects with unacceptable risk and their degree of security deficit. Such a risk assessment methodology, initially developed by the Swiss federal authorities, is illustrated by its application on a reach of the Alzette River (Luxembourg) in the framework of the IRMA-SPONGE FRHYMAP project. Flood risk assessment always involves a flood hazard analysis, an exposed object vulnerability analysis, and an analysis combing the results of these two previous analyses. The flood hazard analysis was done with the quasi-2D hydraulic model FldPln to produce flood intensity maps. Flood intensity was determined by the water height and velocity. Object data for the vulnerability analysis, provided by the Luxembourg government, were classified according to their potential damage. Potential damage is expressed in terms of direct, human life and secondary losses. A thematic map was produced to show the object classification. Protection goals were then attributed to the object classes. Protection goals are assigned in terms of an acceptable flood intensity for a certain flood frequency. This is where input from land use managers and politicians comes into play. The perception of risk in the re- gion or country influences the protection goal assignment. Protection goals as used in Switzerland were used in this project. Thematic maps showing the protection goals of each object in the case study area for a given flood frequency were produced. Com- parison between an object's protection goal and the intensity of the flood that touched the object determine the acceptability of the risk and the

  16. Toward a Stakeholder Perspective on Social Stability Risk of Large Hydraulic Engineering Projects in China: A Social Network Analysis

    Directory of Open Access Journals (Sweden)

    Zhengqi He

    2018-04-01

    Full Text Available In China, large hydraulic engineering projects have made a great contribution to social economic development; at the same time, they also lead to social risks that affect social stability. The pluralism of stakeholders in large hydraulic engineering projects and the complex interrelationship among stakeholders are the important factors affecting social stability risk. Previous studies of social stability risk have mainly focused on risk identification and risk assessment, without considering the relationships among stakeholders and their linkages of risks. For large hydraulic engineering projects, this paper investigated the relevant risk factors and their interrelationships through a literature review and interviews that represented stakeholder perspectives. The key social stability risk factors were identified based on social network analysis. A multi-channel project financial system, a perfect interest compensation mechanism, an efficient prevention mechanism of group events, and a complete project schedule control system were proposed to mitigate the social stability risks. This study combined stakeholder management with risk management by using social network analysis, providing reference for the social stability risk management of large engineering projects in China.

  17. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  18. Balancing risk in regulatory decision making: the Port Granby Project case study

    International Nuclear Information System (INIS)

    Benitez, L.; Kleb, H.

    2011-01-01

    The purpose of this paper is to review the trade-offs that are routinely considered in regulatory decision making, and the policy basis and methods for making those trade-offs. Regulatory decisions under the Canadian Environmental Assessment Act (CEAA) and the Nuclear Safety and Control Act (NSCA) normally consider potential risks to the environment, human health and safety, if a project were to proceed. There is only limited consideration, under such circumstances, of the risks to the environment, human health and safety if the project were not to proceed. The focus is on the potential adverse effects of the project, except in the event of an emergency, where the focus shifts to the economic and other beneficial effects. The Port Granby long-term low-level radioactive waste management project is a project to clean up and provide appropriate local, long-term management of historic low-level radioactive waste (LLRW) in the Port Granby, Ontario area. Approximately 0.4 M m 3 of LLRW, presently located at the Port Granby Waste Management Facility, is to be transported to a newly constructed long-term waste management facility ~700 m north of the bluff face where the facility is located. Accordingly, the project is subject to environmental assessment and licensing processes under the CEAA and the NSCA, respectively. While the Port Granby Project does not represent an emergency situation, it does represent a situation that could result in a significant degree of environmental risk if the project were not to proceed. Over the course of the various studies that have been undertaken at the Waste Management Facility, it has become apparent that the facility is subject to erosion and gullying along the bluff face. The potential for the leaching of contaminants from the existing facility and the erosion of the Lake Ontario bluffs are recognized as ongoing risks that will continue and potentially worsen if the project does not proceed. The economic and other considerations that

  19. The VeTOOLS Project: an example of how to strengthen collaboration between scientists and Civil Protections in disaster risk reduction

    Science.gov (United States)

    Marti, Joan; Bartolini, Stefania; Becerril, Laura

    2016-04-01

    VeTOOLS is a project funded by the European Commission's Humanitarian Aid and Civil Protection department (ECHO), and aims at creating an integrated software platform specially designed to assess and manage volcanic risk. The project facilitates interaction and cooperation between scientists and Civil Protection Agencies in order to share, unify, and exchange procedures, methodologies and technologies to effectively reduce the impacts of volcanic disasters. The project aims at 1) improving and developing volcanic risk assessment and management capacities in active volcanic regions; 2) developing universal methodologies, scenario definitions, response strategies and alert protocols to cope with the full range of volcanic threats; 4) improving quantitative methods and tools for vulnerability and risk assessment; and 5) defining thresholds and protocols for civil protection. With these objectives, the VeTOOLS project points to two of the Sendai Framework resolutions for implementing it: i) Provide guidance on methodologies and standards for risk assessments, disaster risk modelling and the use of data; ii) Promote and support the availability and application of science and technology to decision-making, and offers a good example on how a close collaboration between science and civil protection is an effective way to contribute to DRR. European Commission ECHO Grant SI2.695524

  20. A new approach to criteria for health risk assessment

    International Nuclear Information System (INIS)

    Spickett, Jeffery; Katscherian, Dianne; Goh, Yang Miang

    2012-01-01

    Health Impact Assessment (HIA) is a developing component of the overall impact assessment process and as such needs access to procedures that can enable more consistent approaches to the stepwise process that is now generally accepted in both EIA and HIA. The guidelines developed during this project provide a structured process, based on risk assessment procedures which use consequences and likelihood, as a way of ranking risks to adverse health outcomes from activities subjected to HIA or HIA as part of EIA. The aim is to assess the potential for both acute and chronic health outcomes. The consequences component also identifies a series of consequences for the health care system, depicted as expressions of financial expenditure and the capacity of the health system. These more specific health risk assessment characteristics should provide for a broader consideration of health consequences and a more consistent estimation of the adverse health risks of a proposed development at both the scoping and risk assessment stages of the HIA process. - Highlights: ► A more objective approach to health risk assessment is provided. ► An objective set of criteria for the consequences for chronic and acute impacts. ► An objective set of criteria for the consequences on the health care system. ► An objective set of criteria for event frequency that could impact on health. ► The approach presented is currently being trialled in Australia.

  1. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  2. Data banks for risk assessment at the Savannah River Site

    International Nuclear Information System (INIS)

    Durant, W.S.; Townsend, C.S.; Baughman, D.F.; Hang, P.

    1992-01-01

    One of the lessons learned from many years of risk assessment experience is that mistakes of the past are soon forgotten if no method is available to retrieve and review these events. Savannah River Site has maintained a computerized data bank system for recording, retrieving and reviewing its incident history. The system is based on a series of compilations developed primarily for risk assessment but has been found to be invaluable for many other uses such as equipment reliability, project justification, and incident investigations

  3. Evaluation and financial risk management of urban renewal projects in partnership with public and private

    Directory of Open Access Journals (Sweden)

    Ehsan Hassani

    2011-10-01

    Full Text Available Financing plays an important role for renewal of old city building is find suitable financing plan. A proper financial management in one hand has a direct relationship with project main factors such as: time, cost and quality of the project, and on the other hand, achieving project goals requires a comprehensive insight of project, stockholders as well as other relative situation in regard with the project. Considering the complication of execution such projects and the number of shareholders, one of the best attitudes towards the project management is risk management. This research is a qualitative and practical, which reviews the effects of project management factors on financial return of urban renewal sachem. The required information gained through a survey and via questionnaire and interviews with specialists. This article first describes the public private financial partnership and then, based on the results gained from a case study done on one of the renewal schemes in Mashhad metropolitan areas. Next, it identifies and evaluates of positive and negative risks, which lead to threats and opportunities will be performed and will attempt to respond the existent risks. Finally, we provide a framework for the risk assessment of the housing units.

  4. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  5. Offshore risk assessment

    CERN Document Server

    Vinnem, Jan-Erik

    2014-01-01

      Offshore Risk Assessment was the first book to deal with quantified risk assessment (QRA) as applied specifically to offshore installations and operations. Risk assessment techniques have been used for more than three decades in the offshore oil and gas industry, and their use is set to expand increasingly as the industry moves into new areas and faces new challenges in older regions.   This updated and expanded third edition has been informed by a major R&D program on offshore risk assessment in Norway and summarizes research from 2006 to the present day. Rooted with a thorough discussion of risk metrics and risk analysis methodology,  subsequent chapters are devoted to analytical approaches to escalation, escape, evacuation and rescue analysis of safety and emergency systems.   Separate chapters analyze the main hazards of offshore structures: fire, explosion, collision, and falling objects as well as structural and marine hazards. Risk mitigation and control are discussed, as well as an illustrat...

  6. Task-based dermal exposure models for regulatory risk assessment

    NARCIS (Netherlands)

    Warren, N.D.; Marquart, H.; Christopher, Y.; Laitinen, J.; Hemmen, J.J. van

    2006-01-01

    The regulatory risk assessment of chemicals requires the estimation of occupational dermal exposure. Until recently, the models used were either based on limited data or were specific to a particular class of chemical or application. The EU project RISKOFDERM has gathered a considerable number of

  7. Modeling Research Project Risks with Fuzzy Maps

    Science.gov (United States)

    Bodea, Constanta Nicoleta; Dascalu, Mariana Iuliana

    2009-01-01

    The authors propose a risks evaluation model for research projects. The model is based on fuzzy inference. The knowledge base for fuzzy process is built with a causal and cognitive map of risks. The map was especially developed for research projects, taken into account their typical lifecycle. The model was applied to an e-testing research…

  8. Multi-Model Projections of River Flood Risk in Europe under Global Warming

    Directory of Open Access Journals (Sweden)

    Lorenzo Alfieri

    2018-01-01

    Full Text Available Knowledge on the costs of natural disasters under climate change is key information for planning adaptation and mitigation strategies of future climate policies. Impact models for large scale flood risk assessment have made leaps forward in the past few years, thanks to the increased availability of high resolution climate projections and of information on local exposure and vulnerability to river floods. Yet, state-of-the-art flood impact models rely on a number of input data and techniques that can substantially influence their results. This work compares estimates of river flood risk in Europe from three recent case studies, assuming global warming scenarios of 1.5, 2, and 3 degrees Celsius from pre-industrial levels. The assessment is based on comparing ensemble projections of expected damage and population affected at country level. Differences and common points between the three cases are shown, to point out main sources of uncertainty, strengths, and limitations. In addition, the multi-model comparison helps identify regions with the largest agreement on specific changes in flood risk. Results show that global warming is linked to substantial increase in flood risk over most countries in Central and Western Europe at all warming levels. In Eastern Europe, the average change in flood risk is smaller and the multi-model agreement is poorer.

  9. Method ranks competing projects by priorities, risk

    International Nuclear Information System (INIS)

    Moeckel, D.R.

    1993-01-01

    A practical, objective guide for ranking projects based on risk-based priorities has been developed by Sun Pipe Line Co. The deliberately simple system guides decisions on how to allocate scarce company resources because all managers employ the same criteria in weighing potential risks to the company versus benefits. Managers at all levels are continuously having to comply with an ever growing amount of legislative and regulatory requirements while at the same time trying to run their businesses effectively. The system primarily is designed for use as a compliance oversight and tracking process to document, categorize, and follow-up on work concerning various issues or projects. That is, the system consists of an electronic database which is updated periodically, and is used by various levels of management to monitor progress of health, safety, environmental and compliance-related projects. Criteria used in determining a risk factor and assigning a priority also have been adapted and found useful for evaluating other types of projects. The process enables management to better define potential risks and/or loss of benefits that are being accepted when a project is rejected from an immediate work plan or budget. In times of financial austerity, it is extremely important that the right decisions are made at the right time

  10. Seismic Risk Assessment for the Kyrgyz Republic

    Science.gov (United States)

    Pittore, Massimiliano; Sousa, Luis; Grant, Damian; Fleming, Kevin; Parolai, Stefano; Fourniadis, Yannis; Free, Matthew; Moldobekov, Bolot; Takeuchi, Ko

    2017-04-01

    The Kyrgyz Republic is one of the most socially and economically dynamic countries in Central Asia, and one of the most endangered by earthquake hazard in the region. In order to support the government of the Kyrgyz Republic in the development of a country-level Disaster Risk Reduction strategy, a comprehensive seismic risk study has been developed with the support of the World Bank. As part of this project, state-of-the-art hazard, exposure and vulnerability models have been developed and combined into the assessment of direct physical and economic risk on residential, educational and transportation infrastructure. The seismic hazard has been modelled with three different approaches, in order to provide a comprehensive overview of the possible consequences. A probabilistic seismic hazard assessment (PSHA) approach has been used to quantitatively evaluate the distribution of expected ground shaking intensity, as constrained by the compiled earthquake catalogue and associated seismic source model. A set of specific seismic scenarios based on events generated from known fault systems have been also considered, in order to provide insight on the expected consequences in case of strong events in proximity of densely inhabited areas. Furthermore, long-span catalogues of events have been generated stochastically and employed in the probabilistic analysis of expected losses over the territory of the Kyrgyz Republic. Damage and risk estimates have been computed by using an exposure model recently developed for the country, combined with the assignment of suitable fragility/vulnerability models. The risk estimation has been carried out with spatial aggregation at the district (rayon) level. The obtained results confirm the high level of seismic risk throughout the country, also pinpointing the location of several risk hotspots, particularly in the southern districts, in correspondence with the Ferghana valley. The outcome of this project will further support the local

  11. Obsolescence Risk Assessment Process Best Practice

    OpenAIRE

    Romero Rojo, Francisco Javier; Roy, Rajkumar; Kelly, S.

    2013-01-01

    A component becomes obsolete when it is no longer available from the original manufacturer to the original specification. In long-lifecycle projects, obsolescence has become a major problem as it prevents the maintenance of the system. This is the reason why obsolescence management is now an essential part of the product support activities in sectors such as defence, aerospace, nuclear and railway; where systems need to be supported for several decades. The obsolescence risk assessment for th...

  12. In prospect: role of safety assessment and risk regulation

    International Nuclear Information System (INIS)

    Novegno, A.; Askulaj, Eh.

    1987-01-01

    Problems of accident prevention in industry and power engineering are considered for the sake of environment and human health protection. Investigations into comparison of power system risks are conducted; based on the data obtained a possibility to control the risk has appeared. The IAEA provides an active assistance in realization of a program of coordinated investigations on the risk assessment using the cost-benefit method. For each NPP investigation into all types of its effect on the environment (risk for personnel and population under normal radioactivity releases and in case of accidents), is conducted. Two approaches to calculating the impacts of accidents at NPPs-'determination' one, based on the designed accident and safety probability evaluation exist. Regional approach appears to be the best one when solving the problems of risk control. Attention is paid to a joint project of the IAEA-UNO and WHO related to risk assessment and control for human health and environment protection at power and other complex commercial systems

  13. Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLJM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk

  14. Model project for the pollution investigation of a lake. The use of nuclear techniques for environmental risk assessment

    International Nuclear Information System (INIS)

    Goektepe, B. G.; Borak, F.; Fowler, S.; Yilmaz Erkol, A.

    2002-01-01

    Environmental pollution monitoring and the protection of water resources are vital in terms of public health and economical consequences for many of the countries. The use of nuclear and isotopic techniques for pollution investigation of water resources on the other hand has been gaining more importance during the recent years. In recognition of the serious pollution problems of the surface water resources; a large scope multidisciplinary environmental management project with short title 'Lake Project' which is designed and developed by the group of scientists at the Cekmece Nuclear Research and Training Center of the Turkish Atomic Energy Authority is presented. This multidisciplinary project has various important aspects; scientific, social, economic, educational, cultural and political. Specific problem a dressed was the serious pollution of Kucukcekmece Lake due to high population and industrial growth in the region as well as creation of public awareness on the peaceful activities of the Cekmece Nuclear Research Center. The main objective was to promote the use of nuclear and isotopic techniques in the assessment of local, national and regional environmental pollution control and management. The project implementation was carried out in two phases and supported by the International Atomic Energy Agency. Water, biota and sediment samples were collected from several sampling stations seasonally. Some of the results are presented in tables for natural radioactivity, chemical and physical parameters. The first phases of the project has provided tools and methods for identifying types and magnitudes of contaminants in the Kucukcekmece Lake. Results obtained from the model project show that the radioactivity pollution levels have no significance in terms of human health and ecosystem. However, major problem regarding lake and marine environmental management is identified as eutrophication. This is a process of water quality degradation caused by mainly by domestic

  15. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  16. Managing risks in the project pipeline.

    Science.gov (United States)

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  17. The MCRA model for probabilistic single-compound and cumulative risk assessment of pesticides.

    Science.gov (United States)

    van der Voet, Hilko; de Boer, Waldo J; Kruisselbrink, Johannes W; Goedhart, Paul W; van der Heijden, Gerie W A M; Kennedy, Marc C; Boon, Polly E; van Klaveren, Jacob D

    2015-05-01

    Pesticide risk assessment is hampered by worst-case assumptions leading to overly pessimistic assessments. On the other hand, cumulative health effects of similar pesticides are often not taken into account. This paper describes models and a web-based software system developed in the European research project ACROPOLIS. The models are appropriate for both acute and chronic exposure assessments of single compounds and of multiple compounds in cumulative assessment groups. The software system MCRA (Monte Carlo Risk Assessment) is available for stakeholders in pesticide risk assessment at mcra.rivm.nl. We describe the MCRA implementation of the methods as advised in the 2012 EFSA Guidance on probabilistic modelling, as well as more refined methods developed in the ACROPOLIS project. The emphasis is on cumulative assessments. Two approaches, sample-based and compound-based, are contrasted. It is shown that additional data on agricultural use of pesticides may give more realistic risk assessments. Examples are given of model and software validation of acute and chronic assessments, using both simulated data and comparisons against the previous release of MCRA and against the standard software DEEM-FCID used by the Environmental Protection Agency in the USA. It is shown that the EFSA Guidance pessimistic model may not always give an appropriate modelling of exposure. Crown Copyright © 2014. Published by Elsevier Ltd. All rights reserved.

  18. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  19. Assessing and managing health and environmental risks from energy and other complex industrial systems

    International Nuclear Information System (INIS)

    1988-03-01

    There is a growing awareness that it is necessary to identify, assess, and manage the risks of energy and other complex industrial activities in order to minimize their potential to harm public health and the environment. Therefore, quantitative risk analysis with emphasis on risk management has become an important aspect in high level decision making for regulation in developed and developing countries. The International Atomic Energy Agency (IAEA), the United Nations Environment Programme (UNEP) and the World Health Organization (WHO) have initiated a project to promote the use of risk assessment and risk management in environmental health and safety decision making throughout the world. A meeting was held in Paris, France on October 13-17, 1986. The purpose of the meeting was to: a) Discuss the state of the art of national and international experience in conducting case studies in the field of assessing and managing industrial risks from energy and other complex industrial systems either at the plant level or in highly industrialized areas within a country; b) Present and discuss planned regional risk management case studies within a country or international research projects on risk management to be implemented in the future; and c) Review the Project Document on ''Assessing, Controlling, and Managing Health and Environmental Risks from Energy and Other Complex Industrial Systems''. The full texts, together with abstracts, of the papers given at the meeting are presented. The summary reviews briefly some of the major points that arose in papers or in the ensuing discussions. Where a consensus view resulted, conclusions were drawn. Major differences of opinion are also noted

  20. An approach to assessing risk in coalbed methane prospect evaluation

    International Nuclear Information System (INIS)

    Vanorsdale, C.R.

    1991-01-01

    The economic evaluation of drilling prospects requires assessing the degree of risk involved and its impact on reserve estimates. In developed areas, risk can be determined in a fairly straightforward manner. In remote wildcat areas, risk can almost never be adequately identified or quantified. Between these extremes lie complex reservoirs -- reservoirs to heterogeneous that each well drilled could exhibit production characteristics unlike those of its neighbors. This paper illustrates the use of a risk assessment methodology in a case study of Fruitland coal prospects in the San Juan Basin of New Mexico. This approach could be applied to coalbed methane prospects or any unconventional or highly heterogeneous reservoir with appropriate modification. The utility of this approach is made apparent in a graphical analysis that relates reserves, rate of return and payout time for managerial or financial presentation. This graphical technique and the underlying risk assessment were used to aid a conservative management team in evaluating participation in a multi-well coalbed project

  1. Including threat actor capability and motivation in risk assessment for Smart GRIDs

    NARCIS (Netherlands)

    Rossebo, J.E.Y.; Fransen, F.; Luiijf, H.A.M.

    2016-01-01

    The SEGRID (Security for Smart Electricity GRIDs) collaboration project, funded by the EU under the FP7 program investigates risk assessment methodologies and their possible need for enhancement. In this paper we discuss the need to include threat actor analysis in threat, vulnerability and risk

  2. Using prior risk-related knowledge to support risk management decisions: lessons learnt from a tunneling project.

    Science.gov (United States)

    Cárdenas, Ibsen Chivatá; Al-Jibouri, Saad S H; Halman, Johannes I M; van de Linde, Wim; Kaalberg, Frank

    2014-10-01

    The authors of this article have developed six probabilistic causal models for critical risks in tunnel works. The details of the models' development and evaluation were reported in two earlier publications of this journal. Accordingly, as a remaining step, this article is focused on the investigation into the use of these models in a real case study project. The use of the models is challenging given the need to provide information on risks that usually are both project and context dependent. The latter is of particular concern in underground construction projects. Tunnel risks are the consequences of interactions between site- and project-specific factors. Large variations and uncertainties in ground conditions as well as project singularities give rise to particular risk factors with very specific impacts. These circumstances mean that existing risk information, gathered from previous projects, is extremely difficult to use in other projects. This article considers these issues and addresses the extent to which prior risk-related knowledge, in the form of causal models, as the models developed for the investigation, can be used to provide useful risk information for the case study project. The identification and characterization of the causes and conditions that lead to failures and their interactions as well as their associated probabilistic information is assumed to be risk-related knowledge in this article. It is shown that, irrespective of existing constraints on using information and knowledge from past experiences, construction risk-related knowledge can be transferred and used from project to project in the form of comprehensive models based on probabilistic-causal relationships. The article also shows that the developed models provide guidance as to the use of specific remedial measures by means of the identification of critical risk factors, and therefore they support risk management decisions. Similarly, a number of limitations of the models are

  3. Concept of risk: risk assessment and nuclear safety

    International Nuclear Information System (INIS)

    Thompson, P.B.

    1980-01-01

    The dissertation is a critical examination of risk assessment and its role in public policy. Nuclear power safety safety issues are selected as the primary source of illustrations and examples. The dissertation examines how risk assessment studies develop a concept of risk which becomes decisive for policy choices. Risk-assessment techniques are interpreted as instruments which secure an evaluation of risk which, in turn, figures prominently in technical reports on nuclear power. The philosophical critique is mounted on two levels. First, an epistemological critique surveys distinctions between the technical concept of risk and more familiar senses of risk. The critique shows that utilization of risk assessment re-structures the concept of risk. The technical concept is contrasted to the function of risk within a decision-maker's conceptual agenda and hierarchy of values. Second, an ethical critique exposes the value commitments of risk assessment recommendations. Although some of these values might be defended for policy decisions, the technical character of risk assessment obfuscates normative issues. Risk assessment is shown to be a form of factual enquiry which, nonetheless, represents a commitment to a specific selection of ethical and social values. Risk assessment should not be interpreted as a primary guide to decision unless the specific values incorporated into its concept of risk are stated explicitly and justified philosophically. Such a statement would allow value questions which have been sublimated by the factual tone of the analytic techniques to be debated on clear, social and ethical grounds

  4. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado

    International Nuclear Information System (INIS)

    1995-02-01

    This risk assessment evaluates the possibility of health and environmental risks from contaminated ground water at the uranium mill tailings site near Durango, Colorado. The former uranium processing site's contaminated soil and material were removed and placed at a disposal site located in Body Canyon, Colorado, during 1986--1991 by the US Departments of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating the nature and extent of ground water contamination at the site. This risk assessment follows an approach similar to that used by the US Environmental Protection Agency. The first step is to determine what site-related contaminants are found in ground water samples. The next step in the risk assessment is to determine how much of these contaminants people might ingest if they got their drinking water from a well on the site. In accordance with standard practice for this type of risk assessment, the highest contaminant concentrations from the most contaminated wells are used. The risk assessment then explains the possible health problems that could result from this amount of contamination

  5. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1995-02-01

    This risk assessment evaluates the possibility of health and environmental risks from contaminated ground water at the uranium mill tailings site near Durango, Colorado. The former uranium processing site`s contaminated soil and material were removed and placed at a disposal site located in Body Canyon, Colorado, during 1986--1991 by the US Departments of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating the nature and extent of ground water contamination at the site. This risk assessment follows an approach similar to that used by the US Environmental Protection Agency. The first step is to determine what site-related contaminants are found in ground water samples. The next step in the risk assessment is to determine how much of these contaminants people might ingest if they got their drinking water from a well on the site. In accordance with standard practice for this type of risk assessment, the highest contaminant concentrations from the most contaminated wells are used. The risk assessment then explains the possible health problems that could result from this amount of contamination.

  6. Multi-hazard risk assessment applied to hydraulic fracturing operations

    Science.gov (United States)

    Garcia-Aristizabal, Alexander; Gasparini, Paolo; Russo, Raffaella; Capuano, Paolo

    2017-04-01

    Without exception, the exploitation of any energy resource produces impacts and intrinsically bears risks. Therefore, to make sound decisions about future energy resource exploitation, it is important to clearly understand the potential environmental impacts in the full life-cycle of an energy development project, distinguishing between the specific impacts intrinsically related to exploiting a given energy resource and those shared with the exploitation of other energy resources. Technological advances as directional drilling and hydraulic fracturing have led to a rapid expansion of unconventional resources (UR) exploration and exploitation; as a consequence, both public health and environmental concerns have risen. The main objective of a multi-hazard risk assessment applied to the development of UR is to assess the rate (or the likelihood) of occurrence of incidents and the relative potential impacts on surrounding environment, considering different hazards and their interactions. Such analyses have to be performed considering the different stages of development of a project; however, the discussion in this paper is mainly focused on the analysis applied to the hydraulic fracturing stage of a UR development project. The multi-hazard risk assessment applied to the development of UR poses a number of challenges, making of this one a particularly complex problem. First, a number of external hazards might be considered as potential triggering mechanisms. Such hazards can be either of natural origin or anthropogenic events caused by the same industrial activities. Second, failures might propagate through the industrial elements, leading to complex scenarios according to the layout of the industrial site. Third, there is a number of potential risk receptors, ranging from environmental elements (as the air, soil, surface water, or groundwater) to local communities and ecosystems. The multi-hazard risk approach for this problem is set by considering multiple hazards

  7. Dutch Risk Assessment tools

    NARCIS (Netherlands)

    Venema, A.

    2015-01-01

    The ‘Risico- Inventarisatie- en Evaluatie-instrumenten’ is the name for the Dutch risk assessment (RA) tools. A RA tool can be used to perform a risk assessment including an evaluation of the identified risks. These tools were among the first online risk assessment tools developed in Europe. The

  8. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Riverton, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Risk Assessment evaluated potential impacts to public health or the environment caused by ground water contamination at the former uranium mill processing site. In the first phase of the U.S. Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project, the tailing and other contaminated material at this site were placed in a disposal cell near the Gas Hills Plant in 1990. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first site-specific document to evaluate potential health and environmental risks for the Riverton site under the Ground Water Project; it will help determine whether remedial actions are needed for contaminated ground water at the site.

  9. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Riverton, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    This Risk Assessment evaluated potential impacts to public health or the environment caused by ground water contamination at the former uranium mill processing site. In the first phase of the U.S. Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project, the tailing and other contaminated material at this site were placed in a disposal cell near the Gas Hills Plant in 1990. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first site-specific document to evaluate potential health and environmental risks for the Riverton site under the Ground Water Project; it will help determine whether remedial actions are needed for contaminated ground water at the site

  10. Visual Impairment/Intracranial Pressure Risk Assessment

    Science.gov (United States)

    Fogarty, Jennifer A.; Durham, T.; Otto, C.; Grounds, D.; Davis, J. R.

    2010-01-01

    Since 2006 there have been 6 reported cases of altered visual acuity and intracranial pressure (ICP) in long duration astronauts. In order to document this risk and develop an integrated approach to its mitigation, the NASA Space Life Sciences Directorate (SLSD) and Human Research Program (HRP) have chosen to use the Human System Risk Board (HSRB) and the risk management analysis tool (RMAT). The HSRB is the venue in which the stakeholders and customers discuss and vet the evidence and the RMAT is the tool that facilitates documentation and comparison of the evidence across mission profiles as well as identification of risk factors, and documentation of mitigation strategies. This process allows for information to be brought forward and dispositioned so that it may be properly incorporated into the RMAT and contribute to the design of the research and mitigation plans. The evidence thus far has resulted in the identification of a visual impairment/intracranial pressure (VIIP) project team, updating of both short and long duration medical requirements designed to assess visual acuity, and a research plan to characterize this issue further. In order to understand this issue more completely, a plan to develop an Accelerated Research Collaboration (ARC) has been approved by the HSRB. The ARC is a novel research model pioneered by the Myelin Repair Foundation. It is a patient centered research model that brings together researchers and clinicians, under the guidance of a scientific advisory panel, to collaborate and produce results much quickly than accomplished through traditional research models. The data and evidence from the updated medical requirements and the VIIP ARC will be reviewed at the HSRB on a regular basis. Each review package presented to the HSRB will include an assessment and recommendation with respect to continuation of research, countermeasure development, occupational surveillance modalities, selection criteria, etc. This process will determine the

  11. Risk assessments of regional climate change over Europe: generation of probabilistic ensemble and uncertainty assessment for EURO-CODEX

    Science.gov (United States)

    Yuan, J.; Kopp, R. E.

    2017-12-01

    Quantitative risk analysis of regional climate change is crucial for risk management and impact assessment of climate change. Two major challenges to assessing the risks of climate change are: CMIP5 model runs, which drive EURO-CODEX downscaling runs, do not cover the full range of uncertainty of future projections; Climate models may underestimate the probability of tail risks (i.e. extreme events). To overcome the difficulties, this study offers a viable avenue, where a set of probabilistic climate ensemble is generated using the Surrogate/Model Mixed Ensemble (SMME) method. The probabilistic ensembles for temperature and precipitation are used to assess the range of uncertainty covered by five bias-corrected simulations from the high-resolution (0.11º) EURO-CODEX database, which are selected by the PESETA (The Projection of Economic impacts of climate change in Sectors of the European Union based on bottom-up Analysis) III project. Results show that the distribution of SMME ensemble is notably wider than both distribution of raw ensemble of GCMs and the spread of the five EURO-CORDEX in RCP8.5. Tail risks are well presented by the SMME ensemble. Both SMME ensemble and EURO-CORDEX projections are aggregated to administrative level, and are integrated into impact functions of PESETA III to assess climate risks in Europe. To further evaluate the uncertainties introduced by the downscaling process, we compare the 5 runs from EURO-CORDEX with runs from the corresponding GCMs. Time series of regional mean, spatial patterns, and climate indices are examined for the future climate (2080-2099) deviating from the present climate (1981-2010). The downscaling processes do not appear to be trend-preserving, e.g. the increase in regional mean temperature from EURO-CORDEX is slower than that from the corresponding GCM. The spatial pattern comparison reveals that the differences between each pair of GCM and EURO-CORDEX are small in winter. In summer, the temperatures of EURO

  12. State of risk assessment

    International Nuclear Information System (INIS)

    Conrad, J.

    1978-03-01

    In view of the growing importance assumed in recent years by scientific work on the calculation, quantification, evaluation and acceptance as well as behavior in the face of risks in general and more specifically, the risks of large industrial plants, the report attempts to provide a survey of the current situation, results and evaluation of this new branch of research, risk assessment. The emphasis of the report is on the basic discussion and criticism of the theoretical and methodological approaches used in the field of risk assessment (section 3). It is concerned above all with - methodical problems of determining and quantifying risks (3.1) - questions of the possibility of risk evaluation and comp arison (3.1, 3.2) - the premises of normative and empirical studies on decision making under risk (3.2, 3.3) - investigations into society's acceptance of risks involved in the introduction of new technologies (3.4) - attempts to combine various aspects of the field of risk assessment in a unified concept (3.5, 3.6, 3.7). Because risk assessment is embedded in the framework of decision theory and technology assessment, it can be implicitly evaluated at a more general level within this framework, as far as its possibilities and weaknesses of method and application are concerned (section 4). Sections 2 and 5 deal with the social context of origin and utilization of risk assessment. Finally, an attempt is made at a summary indicating the possible future development of risk assessment. (orig./HP) [de

  13. Risk Scan: A Review of Risk Assessment Capability and Maturity within the Canadian Safety and Security Program

    Science.gov (United States)

    2014-06-01

    SCADA / ICS Cyber Test Lab initiated in 2013 Psychosocial – academic research exists,; opportunity for sharing and developing impact assessment...ecosystems and species at risk), accidents / system failure (rail; pipelines ; ferries CSSP strategy for the North Focus on regional l(and local) problem...Guidance; business planning; environmental scan; proposal evaluation; and performance measurement Program Risk Management – Guidelines for project

  14. Risk assessment and risk management of mycotoxins.

    Science.gov (United States)

    2012-01-01

    Risk assessment is the process of quantifying the magnitude and exposure, or probability, of a harmful effect to individuals or populations from certain agents or activities. Here, we summarize the four steps of risk assessment: hazard identification, dose-response assessment, exposure assessment, and risk characterization. Risk assessments using these principles have been conducted on the major mycotoxins (aflatoxins, fumonisins, ochratoxin A, deoxynivalenol, and zearalenone) by various regulatory agencies for the purpose of setting food safety guidelines. We critically evaluate the impact of these risk assessment parameters on the estimated global burden of the associated diseases as well as the impact of regulatory measures on food supply and international trade. Apart from the well-established risk posed by aflatoxins, many uncertainties still exist about risk assessments for the other major mycotoxins, often reflecting a lack of epidemiological data. Differences exist in the risk management strategies and in the ways different governments impose regulations and technologies to reduce levels of mycotoxins in the food-chain. Regulatory measures have very little impact on remote rural and subsistence farming communities in developing countries, in contrast to developed countries, where regulations are strictly enforced to reduce and/or remove mycotoxin contamination. However, in the absence of the relevant technologies or the necessary infrastructure, we highlight simple intervention practices to reduce mycotoxin contamination in the field and/or prevent mycotoxin formation during storage.

  15. Site remediation guided by risk assessment

    International Nuclear Information System (INIS)

    McBean, E.A.; Gowing, A.; Pieczonka, G.

    2002-01-01

    'Full text:' Risk assessment (RA) provides an effective tool for identifying hazards with respect to human health and ecological receptors, hazards that arise from contaminants in the environment. Risk assessment relies upon: hazard identification/problem formulation; toxicity assessment; exposure assessment; and risk characterization. Hence, risk assessment provides an effective guide for site remediation through the identification of the associated risks arising from pre- and potential post-remediation activities. As a demonstration of this decision-making process, a site-specific risk assessment (SSRA) was performed on a chemical producing facility. Historical waste practices during the production of DDT compounds resulted in impacted site soils and sediment and soils of the creek passing through the facility. The purpose of the SSRA was to derive site-specific cleanup values for the impacted on-site soils, creek sediments, and embankment soils, incorporating human and ecological receptors associated with the environmental media. The human exposure pathways considered were dermal contact, incidental ingestion, and inhalation of the various soils. The potential human receptors were industrial workers, construction workers, trespassers, and off-site residents. Ingestion of fish from the creek by residents was also evaluated in the human health risk assessment (HHRA). Food web analyses were used to evaluate the impact of exposure to chemical compounds in aquatic sediments and related soils by ecological receptors such as the great blue heron, raccoon, and mink. The SSRA involved modelling the daily chemical intake by receptors and the transfer of chemicals to identified secondary media (e.g., ambient air or animal tissues) that are also potential exposure media. These models, while using the site-specific chemical data in the source media, possess uncertainties associated with default parameters that are only approximations and not site-specific (e.g., soil

  16. Risks and chances of combined forestry and biomass projects under the Clean Development Mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Dutschke, Michael; Kapp, Gerald; Lehmann, Anna; Schaefer, Volkmar (Hamburg Inst. International Economics (Germany))

    2006-06-15

    The Clean Development Mechanism (CDM) aims at reducing greenhouse gas (GHG) emissions, while at the same time taking up CO{sub 2} from the atmosphere in vegetation by means of afforestation and reforestation. In spite of these options being complementary, rules and modalities for both project classes are being treated separately in the relevant decisions by the Conference of the Parties to the UN Framework Convention on Climate Change. The present study reviews the state of bioenergy use in developing countries, modalities and procedures under the CDM, and the potential for transaction cost reduction in climate mitigation projects. There are four potential types of combinations in the matrix between small-scale - large-scale / afforestation and reforestation - bioenergy activities. We develop criteria for assessing sustainable development benefits and present an example project for each of the potential project types. We find that the individual risks of single-category projects do not increase when combining project categories and that each combination holds potential for integrated sustainability benefits. Risks for local livelihoods do increase with project size, but a transparent, participatory planning phase is able to counterbalance smallholders' lack of negotiation power. Further research will have to develop concrete project examples and blueprints with approved CDM methodologies, thereby decreasing transaction costs and risk for all potential project partners. (au)

  17. Biosafety Risk Assessment Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Caskey, Susan Adele [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Gaudioso, Jennifer M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Salerno, Reynolds Mathewson [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). International Biological Threat Reduction Program; Wagner, Stefan M. [Public Health Agency of Canada, Winnipeg, MB (Canada). Canadian Science Centre for Human and Animal Health (CSCHAH); Shigematsu, Mika [National Inst. of Infectious Diseases (NIID), Tokyo (Japan); Risi, George [Infectious Disease Specialists, P.C, Missoula, MT (United States); Kozlovac, Joe [US Dept. of Agriculture (USDA)., Beltsville, MD (United States); Halkjaer-Knudsen, Vibeke [Statens Serum Inst., Copenhagen (Denmark); Prat, Esmeralda [Bayer CropScience, Monheim am Rhein (Germany)

    2010-10-01

    Laboratories that work with biological agents need to manage their safety risks to persons working the laboratories and the human and animal community in the surrounding areas. Biosafety guidance defines a wide variety of biosafety risk mitigation measures, which include measures which fall under the following categories: engineering controls, procedural and administrative controls, and the use of personal protective equipment; the determination of which mitigation measures should be used to address the specific laboratory risks are dependent upon a risk assessment. Ideally, a risk assessment should be conducted in a manner which is standardized and systematic which allows it to be repeatable and comparable. A risk assessment should clearly define the risk being assessed and avoid over complication.

  18. Information resources used in health risk assessment by the New Jersey Department of Environmental Protection

    Energy Technology Data Exchange (ETDEWEB)

    Post, G.B.; Baratta, M.; Wolfson, S.; McGeorge, L. [New Jersey Department of Environmental Protection, Trenton (United States)

    1990-12-31

    The New Jersey Department of Environmental Protection`s responsibilities related to health-based risk assessment are described, including its research projects and its development of health based compound specific standards and guidance levels. The resources used by the agency to support health risk assessment work are outlined.

  19. WAYS TO IMPROVE RISK MANAGEMENT IN COMPLEX PROJECTS

    Directory of Open Access Journals (Sweden)

    Emilia IORDACHE

    2012-01-01

    Full Text Available Risk is present in all human activities; it can be associated with health, security, economy or environment. The goal of risk management is to control, prevent or decrease potential damages. Technically speaking, risk management means all the activities coordinated so as to orient and monitor an organization from the risk perspective. Risk management helps formulate the most adequate decisions by taking account of uncertainties and their effects upon the accomplishment of proposed goals, and argues the need to lay down and implement coercive, preventive actions typical of the management of a company. The benefits of good risk management and also the consequences of bad management shall undoubtedly be felt by an organization’s board, employees, shareholders, customers as well as by all other entities concerned with organizational performance. Projects generally include a number of risks in common with those in business as well as certain typical ones. In complex projects, it is this very feature – complexity – which generates the need to implement risk management for the purpose to diminish, remove, and monitor the risks which can influence the development of a project.

  20. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    Science.gov (United States)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  1. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  2. Wuskwatim generation project : Canadian Environmental Assessment Act comprehensive study report

    International Nuclear Information System (INIS)

    2005-10-01

    This study report described the plan by Manitoba Hydro and the Nisichawayasihk Cree Nation (NCN) to construct a new 200- megawatt (MW) generating station at Taskinigup Falls on the Burntwood River, near the outlet of Wuskwatim Lake. This hydroelectric power project will allow Manitoba Hydro to meet its projected energy needs within the next two decades as identified in its 2002/03 Power Resource Plan. It will also allow Manitoba Hydro and NCN to obtain additional export revenues and profits by advancing the in-service date of the Project from 2020 to 2009. A formal environmental assessment is required under the Canadian Environmental Assessment Act (CEAA) because Fisheries and Oceans Canada (DFO) has determined that the Project would cause fish habitat losses requiring an authorization under the Fisheries Act. Many of the structures to be built in navigable waters would also require formal approval under the Navigable Waters Protection Act (NWPA), which has prompted this application of the CEAA. This environmental assessment report has been prepared by DFO in consultation with Transport Canada and other federal authorities concerned. It provides a summary of the Wuskwatim Generation Project and the environment in which it will be built and operated. In addition, the results of public consultations are discussed. It presents an assessment of the Project's influence on fish and fish habitat, birds, species at risk, human health (local air quality, quality of drinking water and consumption of fishery products), navigation, use of renewable resources, and current use of lands and resources for traditional purposes by Aboriginal persons (hunting, trapping, gathering, subsistence fishing and heritage sites). It was concluded that the proposed Project, as defined by the scope of the study, is not likely to cause significant adverse environmental effects. 45 refs., 5 tabs., 13 figs., 3 appendices

  3. Assessment of uncertainties in risk analysis of chemical establishments. The ASSURANCE project. Final summary report

    DEFF Research Database (Denmark)

    Lauridsen, K.; Kozine, Igor; Markert, Frank

    2002-01-01

    and led the comparison of results in order to reveal the causes for differences between the partners' results. The results of the project point to an increased awareness of the potential uncertainties in riskanalyses and highlight a number of important sources of such uncertainties. In the hazard......This report summarises the results obtained in the ASSURANCE project (EU contract number ENV4-CT97-0627). Seven teams have performed risk analyses for the same chemical facility, an ammonia storage. The EC's Joint Research Centre at Ispra and RisøNational Laboratory co-ordinated the exercise...

  4. Foundation stones for a real socio-environmental integration in projects' impact assessments

    Science.gov (United States)

    Andres Dominguez-Gomez, J.

    2015-04-01

    In the last twenty years, both the increase in academic production and the expansion of professional involvement in Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA), have evidenced growing scientific and business interest in risk and impact analysis. However, this growth has not brought with it a parallel progress in addressing their main shortcomings: insufficient integration of environmental and social features into development project analyses and, in cases where the social aspects are considered, technical-methodological failings in their diagnosis and assessment. It is clear that these weaknesses carry with them substantial threats to the sustainability (social, environmental and economic) of schemes which impact on the environment, and in consequence, to the local contexts where they are carried out and to the delicate balance of the global ecosystem. This paper argue that, in a sociological context of growing complexity, four foundation-stones are required to underpin research methodologies (for both diagnosis and assessment) in the socio-environmental risks of development projects: a theoretical foundation in actor-network theory; an ethical grounding in values which are internationally recognized though not always carried through into practice; a (new) epistemological-scientific base; and a methodological foundation in social participation.

  5. Longitudinal Impact of the Project PATHS on Adolescent Risk Behavior: What Happened after Five Years?

    Directory of Open Access Journals (Sweden)

    Daniel T. L. Shek

    2012-01-01

    Full Text Available The present study investigated the longitudinal impact of the Project PATHS, a large-scale curriculum-based positive youth development program in Hong Kong, on the development of adolescents’ risk behavior over a period of five years. Using a longitudinal randomized controlled design, eight waves of data were collected from 19 experimental schools in which students participated in the Project PATHS (=2,850 at Wave 8 and 24 control schools without joining the Project PATHS (=3,640 at Wave 8. At each wave, students responded to measures assessing their current risk behaviors, including delinquency, use of different types of drug, and their intentions of participating in risk behaviors in the future. Results demonstrated that adolescents receiving the program exhibited significantly slower increases in delinquent behaviors and substance use as compared to the control participants. During two years after the completion of the program, differences in youth risk behaviors in the two groups still existed. These results suggest that the Project PATHS has long-term effect in preventing adolescent problem behavior through promoting positive youth development.

  6. 2007 TOXICOLOGY AND RISK ASSESSMENT ...

    Science.gov (United States)

    EPA has announced The 2007 Toxicology and Risk Assessment Conference Cincinnati Marriott North, West Chester (Cincinnati), OHApril 23- 26, 2007 - Click to register!The Annual Toxicology and Risk Assessment Conference is a unique meeting where several Government Agencies come together to discuss toxicology and risk assessment issues that are not only of concern to the government, but also to a broader audience including academia and industry. The theme of this year's conference is Emerging Issues and Challenges in Risk Assessment and the preliminary agenda includes: Plenary Sessions and prominent speakers (tentative) include: Issues of Emerging Chemical ContaminantsUncertainty and Variability in Risk Assessment Use of Mechanistic data in IARC evaluationsParallel Sessions:Uncertainty and Variability in Dose-Response Assessment Recent Advances in Toxicity and Risk Assessment of RDX The Use of Epidemiologic Data for Risk Assessment Applications Cumulative Health Risk Assessment:

  7. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  8. Knowledge Management (KM) Risk Assessment of Critical Knowledge Loss in an Organization with Expanding Nuclear Power Program

    International Nuclear Information System (INIS)

    Mohsin, M.

    2014-01-01

    Risk and KM risk assessment of critical knowledge loss: • Risk is defined in the Project Management Body of Knowledge (PMBOK,2004) as an event or unclear situation that will influence the timing, cost and quality of a project. • This study considers attrition due to retirements of its workforce -- A risk for the organization as it has implications of loss of knowledge for the organization and thereby on its quality and output. • This study assesses the magnitude of the anticipated Risk of Knowledge Loss in three Operational NPPs namely CNPGS (C-1 and C-2) and K-1 based on the factor of Time until Retirement

  9. Effect of risk aversion on prioritizing conservation projects.

    Science.gov (United States)

    Tulloch, Ayesha I T; Maloney, Richard F; Joseph, Liana N; Bennett, Joseph R; Di Fonzo, Martina M I; Probert, William J M; O'Connor, Shaun M; Densem, Jodie P; Possingham, Hugh P

    2015-04-01

    Conservation outcomes are uncertain. Agencies making decisions about what threat mitigation actions to take to save which species frequently face the dilemma of whether to invest in actions with high probability of success and guaranteed benefits or to choose projects with a greater risk of failure that might provide higher benefits if they succeed. The answer to this dilemma lies in the decision maker's aversion to risk--their unwillingness to accept uncertain outcomes. Little guidance exists on how risk preferences affect conservation investment priorities. Using a prioritization approach based on cost effectiveness, we compared 2 approaches: a conservative probability threshold approach that excludes investment in projects with a risk of management failure greater than a fixed level, and a variance-discounting heuristic used in economics that explicitly accounts for risk tolerance and the probabilities of management success and failure. We applied both approaches to prioritizing projects for 700 of New Zealand's threatened species across 8303 management actions. Both decision makers' risk tolerance and our choice of approach to dealing with risk preferences drove the prioritization solution (i.e., the species selected for management). Use of a probability threshold minimized uncertainty, but more expensive projects were selected than with variance discounting, which maximized expected benefits by selecting the management of species with higher extinction risk and higher conservation value. Explicitly incorporating risk preferences within the decision making process reduced the number of species expected to be safe from extinction because lower risk tolerance resulted in more species being excluded from management, but the approach allowed decision makers to choose a level of acceptable risk that fit with their ability to accommodate failure. We argue for transparency in risk tolerance and recommend that decision makers accept risk in an adaptive management

  10. Risk Assessment

    Science.gov (United States)

    How the EPA conducts risk assessment to protect human health and the environment. Several assessments are included with the guidelines, models, databases, state-based RSL Tables, local contacts and framework documents used to perform these assessments.

  11. Exploration Health Risks: Probabilistic Risk Assessment

    Science.gov (United States)

    Rhatigan, Jennifer; Charles, John; Hayes, Judith; Wren, Kiley

    2006-01-01

    Maintenance of human health on long-duration exploration missions is a primary challenge to mission designers. Indeed, human health risks are currently the largest risk contributors to the risks of evacuation or loss of the crew on long-duration International Space Station missions. We describe a quantitative assessment of the relative probabilities of occurrence of the individual risks to human safety and efficiency during space flight to augment qualitative assessments used in this field to date. Quantitative probabilistic risk assessments will allow program managers to focus resources on those human health risks most likely to occur with undesirable consequences. Truly quantitative assessments are common, even expected, in the engineering and actuarial spheres, but that capability is just emerging in some arenas of life sciences research, such as identifying and minimize the hazards to astronauts during future space exploration missions. Our expectation is that these results can be used to inform NASA mission design trade studies in the near future with the objective of preventing the higher among the human health risks. We identify and discuss statistical techniques to provide this risk quantification based on relevant sets of astronaut biomedical data from short and long duration space flights as well as relevant analog populations. We outline critical assumptions made in the calculations and discuss the rationale for these. Our efforts to date have focussed on quantifying the probabilities of medical risks that are qualitatively perceived as relatively high risks of radiation sickness, cardiac dysrhythmias, medically significant renal stone formation due to increased calcium mobilization, decompression sickness as a result of EVA (extravehicular activity), and bone fracture due to loss of bone mineral density. We present these quantitative probabilities in order-of-magnitude comparison format so that relative risk can be gauged. We address the effects of

  12. Slope Hazard and Risk Assessment in the Tropics: Malaysia' Experience

    Science.gov (United States)

    Mohamad, Zakaria; Azahari Razak, Khamarrul; Ahmad, Ferdaus; Manap, Mohamad Abdul; Ramli, Zamri; Ahmad, Azhari; Mohamed, Zainab

    2015-04-01

    The increasing number of geological hazards in Malaysia has often resulted in casualties and extensive devastation with high mitigation cost. Given the destructive capacity and high frequency of disaster, Malaysia has taken a step forward to address the multi-scale landslide risk reduction emphasizing pre-disaster action rather than post-disaster reaction. Slope hazard and risk assessment in a quantitative manner at regional and national scales remains challenging in Malaysia. This paper presents the comprehensive methodology framework and operational needs driven by modern and advanced geospatial technology to address the aforementioned issues in the tropics. The Slope Hazard and Risk Mapping, the first national project in Malaysia utilizing the multi-sensor LIDAR has been critically implemented with the support of multi- and trans-disciplinary partners. The methodological model has been formulated and evaluated given the complexity of risk scenarios in this knowledge driven project. Instability slope problems in the urban, mountainous and tectonic landscape are amongst them, and their spatial information is of crucial for regional landslide assessment. We develop standard procedures with optimal parameterization for susceptibility, hazard and risk assessment in the selected regions. Remarkably, we are aiming at producing an utmost complete landslide inventory in both space and time. With the updated reliable terrain and landscape models, the landslide conditioning factor maps can be accurately derived depending on the landslide types and failure mechanisms which crucial for hazard and risk assessment. We also aim to improve the generation of elements at risk for landslide and promote integrated approaches for a better disaster risk analysis. As a result, a new tool, notably multi-sensor LIDAR technology is a very promising tool for an old geological problem and its derivative data for hazard and risk analysis is an effective preventive measure in Malaysia

  13. Baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Belfield, North Dakota. Revision 1

    International Nuclear Information System (INIS)

    1994-09-01

    This risk assessment evaluates the potential for impacts to public health or the environment from contaminated ground water at this site caused by the burning of coal containing uranium to produce uranium. Potential risk is quantified for constituents introduced from the processing activities and not for those constituents naturally occurring in background ground water in the site vicinity. Because background ground water quality has the potential to cause adverse health effects from exposure through drinking, any risks associated with contaminants attributable to site activities are incremental to these risks from background. The incremental risk from site-related contaminants is quantified in this risk assessment. The baseline risk from background water quality is incorporated only into the assessment of potential chemical interactions and the definition of the overall site condition. The US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is developing plans to remedy soil and ground water contamination at the site. The UMTRA Surface Project consists of determining the extent of soil contamination and disposing of the contaminated soils in an engineered disposal cell. The UMTRA Ground Water Project consists of evaluating ground water contamination. Under the UMTRA Ground Water Project, results of this risk assessment will help determine what ground water compliance strategy may be applied at the site

  14. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This Baseline Risk Assessment of Groundwater Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells. This risk assessment evaluates the most contaminated monitor wells at the processing site. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium.

  15. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado

    International Nuclear Information System (INIS)

    1993-12-01

    This Baseline Risk Assessment of Groundwater Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells. This risk assessment evaluates the most contaminated monitor wells at the processing site. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium

  16. Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

    Science.gov (United States)

    Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.

    2014-01-01

    Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

  17. Social impact assessment in energy projects

    International Nuclear Information System (INIS)

    Koivujaervi, S.; Kantola, I.; Maekinen, P.

    1998-01-01

    The research report is based on literature and interviews on the social impact assessment (SIA) in energy projects in Finland, both before and after the EIA Act has been in force in Finland. The concept and content of SIA, the requirements set by the legislation, its relation with other environmental impacts, the assessment process and the used methods have been studied on the basis of the literature analysis. A total of 26 persons representing the coordination authorities, persons issuing statements, researchers, civil servants, consultants and project developers were interviewed for the research. The interviews were made by the University of Turku in the form of theme interviews, investigating the present status, practices and expectations of the SIA. The unestablished status was seen to be the problem in the SIA, which was reflected in the interviewers' varying views about the content of the SIA. Among the operators, the general character of the SIA criticism in the statements concerning the assessment programmes or reports was seen as a problem as well; the assessment of social impact has been considered to be insufficient, however, without any identification of the effects or how the effects should have been assessed. For the time preceding the EIA Act, the assessment of the social impact of hydraulic work, power plant and transmission line projects and the project of the fifth nuclear power plant have been studied. As to the power plant and transmission line projects after the validity of the EIA Act, all the 20 projects were gone through which had progressed during the spring 1998 at least to the assessment report stage. Of these projects, the assessment of the social impact of one transmission line and one power plant project was studied in detail. The report also studies the assessment of the social impact of the repository for nuclear waste on the basis of the experience gained in Finland and in other countries. On the basis of the literature study

  18. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  19. Managing Risks in Distributed Software Projects: An Integrative Framework

    DEFF Research Database (Denmark)

    Persson, John Stouby; Mathiassen, Lars; Boeg, Jesper

    2009-01-01

    techniques into an integrative framework for managing risks in distributed contexts. Subsequent implementation of a Web-based tool helped us refine the framework based on empirical evaluation of its practical usefulness.We conclude by discussing implications for both research and practice.......Software projects are increasingly geographically distributed with limited face-to-face interaction between participants. These projects face particular challenges that need carefulmanagerial attention. While risk management has been adopted with success to address other challenges within software...... development, there are currently no frameworks available for managing risks related to geographical distribution. On this background, we systematically review the literature on geographically distributed software projects. Based on the review, we synthesize what we know about risks and risk resolution...

  20. Risk-profile modification of energy projects

    International Nuclear Information System (INIS)

    Larson, B.O.

    1992-01-01

    The commodity futures and swaps markets are thought to be the invention of speculators, the bane of the oil business, or possibly something confined to finance departments of major corporations. In actuality, they should be considered more as an insurance vehicle and can be used at the project level to modify the risk profile of a property. In this context, an increased familiarity with them can be useful for an engineer. Either futures of swaps can be used to guarantee or modify product prices. While this does not necessarily maximize cash flow or present worth, it can protect a project or company for several years from downside price risk, thereby reducing the risk of the venture. This can be particularly important if lower product prices would cause unacceptable cash flows or net incomes. This paper reports that reducing risk by limiting downside price exposure could alter budgeting decisions, allow continued or expanded operations of a particular property, or increase debt capacity

  1. Assessment of Medical Risks and Optimization of their Management using Integrated Medical Model

    Science.gov (United States)

    Fitts, Mary A.; Madurai, Siram; Butler, Doug; Kerstman, Eric; Risin, Diana

    2008-01-01

    The Integrated Medical Model (IMM) Project is a software-based technique that will identify and quantify the medical needs and health risks of exploration crew members during space flight and evaluate the effectiveness of potential mitigation strategies. The IMM Project employs an evidence-based approach that will quantify probability and consequences of defined in-flight medical risks, mitigation strategies, and tactics to optimize crew member health. Using stochastic techniques, the IMM will ultimately inform decision makers at both programmatic and institutional levels and will enable objective assessment of crew health and optimization of mission success using data from relevant cohort populations and from the astronaut population. The objectives of the project include: 1) identification and documentation of conditions that may occur during exploration missions (Baseline Medical Conditions List [BMCL), 2) assessment of the likelihood of conditions in the BMCL occurring during exploration missions (incidence rate), 3) determination of the risk associated with these conditions and quantify in terms of end states (Loss of Crew, Loss of Mission, Evacuation), 4) optimization of in-flight hardware mass, volume, power, bandwidth and cost for a given level of risk or uncertainty, and .. validation of the methodologies used.

  2. Assessing the impact of the heart of New Ulm Project on cardiovascular disease risk factors: A population-based program to reduce cardiovascular disease.

    Science.gov (United States)

    Sidebottom, Abbey C; Sillah, Arthur; Vock, David M; Miedema, Michael D; Pereira, Raquel; Benson, Gretchen; Lindberg, Rebecca; Boucher, Jackie L; Knickelbine, Thomas; VanWormer, Jeffrey J

    2018-04-07

    The Heart of New Ulm Project (HONU), is a population-based project designed to reduce modifiable cardiovascular disease (CVD) risk factors in the rural community of New Ulm, MN. HONU interventions address multiple levels of the social-ecological model. The community is served by one health system, enabling the use of electronic health record (EHR) data for surveillance. The purpose of this study was to assess if trends in CVD risk factors and healthcare utilization differed between a cohort of New Ulm residents age 40-79 and matched controls selected from a similar community, using EHR data from baseline (2008-2009) through three follow up time periods (2010-2011, 2012-2013, 2014-2015). Matching, using covariate balance sparse technique, yielded a sample of 4077 New Ulm residents and 4077 controls. We used mixed effects longitudinal models to examine trends over time between the two groups. Blood pressure, total cholesterol, low-density lipoprotein-cholesterol, and triglycerides showed better management in New Ulm over time compared to the controls. The proportion of residents in New Ulm with controlled blood pressure increased by 6.2 percentage points compared to an increase of 2 points in controls (p risk scores increased less in New Ulm (5.1) than the comparison community (5.9). The intervention and control community did not differ with regard to inpatient stays, smoking, or glucose. Findings suggest efficacy for the HONU project interventions for some outcomes. Copyright © 2017. Published by Elsevier Inc.

  3. Fuzzy hierarchical model for risk assessment principles, concepts, and practical applications

    CERN Document Server

    Chan, Hing Kai

    2013-01-01

    Risk management is often complicated by situational uncertainties and the subjective preferences of decision makers. Fuzzy Hierarchical Model for Risk Assessment introduces a fuzzy-based hierarchical approach to solve risk management problems considering both qualitative and quantitative criteria to tackle imprecise information.   This approach is illustrated through number of case studies using examples from the food, fashion and electronics sectors to cover a range of applications including supply chain management, green product design and green initiatives. These practical examples explore how this method can be adapted and fine tuned to fit other industries as well.   Supported by an extensive literature review, Fuzzy Hierarchical Model for Risk Assessment  comprehensively introduces a new method for project managers across all industries as well as researchers in risk management.

  4. The KnowRISK project: Tools and strategies for risk communication and learning

    Science.gov (United States)

    Musacchio, Gemma; Amaral Ferreira, Mónica; Falsaperla, Susanna; Piangiamore, Giovanna Lucia; Pino, Nicola Alessandro; Solarino, Stefano; Crescimbene, Massimo; Eva, Elena; Reitano, Danilo; Þorvaldsdottir, Solveig; Sousa Silva, Delta; Rupakhety, Rajesh; Sousa Oliveira, Carlos

    2016-04-01

    Damage of non-structural elements of buildings (i.e. partitions, ceilings, cladding, electrical and mechanical systems and furniture) is known to cause injuries and human losses. Also it has a significant impact on earthquake resilience and is yet being worldwide underestimated. The project KnowRISK (Know your city, Reduce seISmic risK through non-structural elements) is financed by the European Commission to develop prevention measures that may reduce non-structural damage in urban areas. Pilot areas of the project are within the three European participating countries, namely Portugal, Iceland and Italy. They were chosen because they are prone to damage level 2 and 3 (EMS-98, European Macroseismic Scale) that typically affects non-structural elements. We will develop and test a risk communication strategy taking into account the needs of households and schools, putting into practice a portfolio of best practice to reduce the most common non-structural vulnerabilities. We will target our actions to different societal groups, considering their cultural background and social vulnerabilities, and implement a participatory approach that will promote engagement and interaction between the scientific community, practitioners and citizens to foster knowledge on everyone's own neighborhoods, resilience and vulnerability. A Practical Guide for citizens will highlight that low-cost actions can be implemented to increase safety of households, meant as being the places where the most vulnerable societal groups, including children and elderly people, spend much of their time. Since our actions towards communication will include education, we will define tools that allow a clear and direct understanding of elements exposed to risk. Schools will be one of our target societal groups and their central role played at the community level will ensure spreading and strengthening of the communication process. Schools are often located in old or re-adapted buildings, formerly used for

  5. Hanford Site's Integrated Risk Assessment Program: No-intervention risk assessment

    International Nuclear Information System (INIS)

    Mahaffey, J.A.; Dukelow, J.S. Jr.; Stenner, R.D.

    1994-08-01

    The long-term goal of the Integrated Risk Assessment program (IRAP) is to estimate risks to workers, the public, organizations, and groups with reserved rights to Site access, the ecosystem, and natural resources to aid in managing environmental restoration and waste management at the Hanford Site. For each of these, information is needed about current risks, risks during cleanup, and endstate risks. The objective is three-fold: to determine if and when to remediate, and to what extent; to identify information unavailable but needed to make better cleanup decisions; to establish technology performance criteria for achieving desired cleanup levels; to understand costs and benefits of activities from a Site-wide perspective. The no-intervention risk, assessment is the initial evaluation of public health risks conducted under IRAP. The objective is to identify types of activities that the US Department of Energy (DOE) must accomplish for closure of the Hanford Site, defined as no further DOE intervention. There are two primary conclusions from the no-intervention risk assessment. First, some maintenance and operations activities at Hanford must be continued to protect the public from grave risks. However, when large Hanford expenditures are compared to cleanup progress, funds expended for maintenance and operations must be put in proper perspective. Second, stakeholder's emphasis on public risks at Hanford, as indicated by remediation priorities, are not in line with those estimated. The focus currently is on compliance with regulations, and on dealing with issues which are visible to stakeholders

  6. A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2017-10-01

    Full Text Available Evaluating the sustainability risk level of public–private partnership (PPP projects can reduce project risk incidents and achieve the sustainable development of the organization. However, the existing studies about PPP projects risk management mainly focus on exploring the impact of financial and revenue risks but ignore the sustainability risks, causing the concept of “sustainability” to be missing while evaluating the risk level of PPP projects. To evaluate the sustainability risk level and achieve the most important objective of providing a reference for the public and private sectors when making decisions on PPP project management, this paper constructs a factor system of sustainability risk of PPP projects based on an extensive literature review and develops a mathematical model based on the methods of fuzzy comprehensive evaluation model (FCEM and failure mode, effects and criticality analysis (FMECA for evaluating the sustainability risk level of PPP projects. In addition, this paper conducts computational experiment based on a questionnaire survey to verify the effectiveness and feasibility of this proposed model. The results suggest that this model is reasonable for evaluating the sustainability risk level of PPP projects. To our knowledge, this paper is the first study to evaluate the sustainability risk of PPP projects, which would not only enrich the theories of project risk management, but also serve as a reference for the public and private sectors for the sustainable planning and development. Keywords: sustainability risk eva

  7. Managing a complex project using a risk-risk multiple domain matrix

    International Nuclear Information System (INIS)

    Pointurier, C.; Marle, F.; Jaber, H.

    2014-01-01

    This communication aims at presenting a clustering methodology applied to a complex project consisting of the delivery of three interdependent subsystems. This enables small and complementary task forces to be constituted, enhancing the communication and coordination on transverse issues related to the complexity of the whole system. The problem is to gather and exploit data for such systems, with numerous and heterogeneous risks of different domains (product, process, organization). The method consists in regrouping actors through the clustering of the risks they own. The result is a highlight on important and transverse risk interdependencies, within and between projects. These should not be neglected in order to avoid potential severe issues, whether during the project or during the exploitation of its deliverable. An application on a real program of plant implementation in the CEA-DAM is presented, with a sensitivity analysis of the clustering results to the inputs and chosen configurations of the problem. (authors)

  8. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado

    International Nuclear Information System (INIS)

    1994-04-01

    This report evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells to determine the potential for immediate human health and environmental impacts. This risk assessment evaluates the most contaminated groundwater that flows beneath the processing site towards the Gunnison River. The monitor wells that have consistently shown the highest concentration of most contaminants are used in this risk assessment. This risk assessment will be used in conjunction with additional activities and documents to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium

  9. Chemical Risk Assessment

    Science.gov (United States)

    This course is aimed at providing an overview of the fundamental guiding principles and general methods used in chemical risk assessment. Chemical risk assessment is a complex and ever-evolving process. These principles and methods have been organized by the National Research Cou...

  10. Comparisons on International Approaches of Business and Project Risk Management

    OpenAIRE

    Nadia Carmen ENE

    2005-01-01

    In this article we intend to present a comparative approach between three recognized international methodologies for risk management: RISKMAN, Project Management Institute Methodology-PMBoK and Project Risk Analysis and Management Guide (produced by Association for Project Management).

  11. Assessment of Large Transport Infrastructure Projects: the CBA-DK model

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Banister, David

    2008-01-01

    The scope of this paper is to present a newly developed decision support model to assess transport infrastructure projects: CBA-DK. The model makes use of conventional cost-benefit analysis resulting in aggregated single point estimates and quantitative risk analysis using Monte Carlo simulation...... resulting in interval results. The embedded uncertainties within traditional CBA such as ex-ante based investment costs and travel time savings are of particular concern. The methodological approach has been to apply suitable probability distribution functions on the uncertain parameters, thus resulting...... in feasibility risk assessment moving from point to interval results. Decision support as illustrated in this paper aims to provide assistance in the development and ultimately the choice of action while accounting for the uncertainties surrounding transport appraisal schemes. The modelling framework...

  12. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  13. A 21st century roadmap for human health risk assessment.

    Science.gov (United States)

    Pastoor, Timothy P; Bachman, Ammie N; Bell, David R; Cohen, Samuel M; Dellarco, Michael; Dewhurst, Ian C; Doe, John E; Doerrer, Nancy G; Embry, Michelle R; Hines, Ronald N; Moretto, Angelo; Phillips, Richard D; Rowlands, J Craig; Tanir, Jennifer Y; Wolf, Douglas C; Boobis, Alan R

    2014-08-01

    The Health and Environmental Sciences Institute (HESI)-coordinated Risk Assessment in the 21st Century (RISK21) project was initiated to develop a scientific, transparent, and efficient approach to the evolving world of human health risk assessment, and involved over 120 participants from 12 countries, 15 government institutions, 20 universities, 2 non-governmental organizations, and 12 corporations. This paper provides a brief overview of the tiered RISK21 framework called the roadmap and risk visualization matrix, and articulates the core principles derived by RISK21 participants that guided its development. Subsequent papers describe the roadmap and matrix in greater detail. RISK21 principles include focusing on problem formulation, utilizing existing information, starting with exposure assessment (rather than toxicity), and using a tiered process for data development. Bringing estimates of exposure and toxicity together on a two-dimensional matrix provides a clear rendition of human safety and risk. The value of the roadmap is its capacity to chronicle the stepwise acquisition of scientific information and display it in a clear and concise fashion. Furthermore, the tiered approach and transparent display of information will contribute to greater efficiencies by calling for data only as needed (enough precision to make a decision), thus conserving animals and other resources.

  14. Risk assessment in the DOE Assurance Program for Remedial Action

    International Nuclear Information System (INIS)

    Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

    1985-08-01

    This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly

  15. An integrated risk assessment approach: Risk assessment in the programmatic environmental impact statement

    International Nuclear Information System (INIS)

    Morris, J.M.

    1994-01-01

    The following paper is an informal summary of salient points made in the presentation entitled open-quotes An Integrated Risk Assessment Approach: Risk Assessment in the Programmatic Environmental Impact Statement (PEIS).close quotes. This presentation was given at the U.S. DOE Integrated Planning Workshop in Denver, Colorado on June 2, 1994. Integrated decision analysis is very important in environmental restoration and waste management in the evaluation of such things as land use planning, waste load forecasting, cost analyses, and technology development activities. Integrated risk assessment is an approach that addresses multiple components of risk, including: risks from surplus facilities as well as typical environmental restoration sites, risks to the public, risks to workers, ecological risk, risks before, during and after remediation activities, and others

  16. Fuzzy model for risk assessment of persistent organic pollutants in aquatic ecosystems

    International Nuclear Information System (INIS)

    Seguí, X.; Pujolasus, E.; Betrò, S.; Àgueda, A.; Casal, J.; Ocampo-Duque, W.; Rudolph, I.; Barra, R.; Páez, M.; Barón, E.; Eljarrat, E.; Barceló, D.; Darbra, R.M.

    2013-01-01

    We developed a model for evaluating the environmental risk of persistent organic pollutants (POPs) to aquatic organisms. The model is based on fuzzy theory and uses information provided by international experts through a questionnaire. It has been tested in two case studies for a particular type of POPs: brominated flame retardants (BFRs). The first case study is related to the EU-funded AQUATERRA project, with sampling campaigns carried out in two Ebro tributaries in Spain (the Cinca and Vero Rivers). The second one, named the BROMACUA project, assessed different aquatic ecosystems in Chile (San Vicente Bay) and Colombia (Santa Marta Marsh). In both projects, the BFRs under study were polybrominated diphenyl ethers (PBDEs) and hexabromocyclododecane (HBCD). However, the model can be extrapolated to other POPs and to different aquatic ecosystems to provide useful results for decision-makers. -- The risk of POPs for aquatic organisms was assessed at several sites around the world, using a fuzzy-based model to provide useful results for decision-makers

  17. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  18. Korean risk assessment model for breast cancer risk prediction.

    Science.gov (United States)

    Park, Boyoung; Ma, Seung Hyun; Shin, Aesun; Chang, Myung-Chul; Choi, Ji-Yeob; Kim, Sungwan; Han, Wonshik; Noh, Dong-Young; Ahn, Sei-Hyun; Kang, Daehee; Yoo, Keun-Young; Park, Sue K

    2013-01-01

    We evaluated the performance of the Gail model for a Korean population and developed a Korean breast cancer risk assessment tool (KoBCRAT) based upon equations developed for the Gail model for predicting breast cancer risk. Using 3,789 sets of cases and controls, risk factors for breast cancer among Koreans were identified. Individual probabilities were projected using Gail's equations and Korean hazard data. We compared the 5-year and lifetime risk produced using the modified Gail model which applied Korean incidence and mortality data and the parameter estimators from the original Gail model with those produced using the KoBCRAT. We validated the KoBCRAT based on the expected/observed breast cancer incidence and area under the curve (AUC) using two Korean cohorts: the Korean Multicenter Cancer Cohort (KMCC) and National Cancer Center (NCC) cohort. The major risk factors under the age of 50 were family history, age at menarche, age at first full-term pregnancy, menopausal status, breastfeeding duration, oral contraceptive usage, and exercise, while those at and over the age of 50 were family history, age at menarche, age at menopause, pregnancy experience, body mass index, oral contraceptive usage, and exercise. The modified Gail model produced lower 5-year risk for the cases than for the controls (p = 0.017), while the KoBCRAT produced higher 5-year and lifetime risk for the cases than for the controls (pKorean women, especially urban women.

  19. Tsunami hazard and risk assessment in El Salvador

    Science.gov (United States)

    González, M.; González-Riancho, P.; Gutiérrez, O. Q.; García-Aguilar, O.; Aniel-Quiroga, I.; Aguirre, I.; Alvarez, J. A.; Gavidia, F.; Jaimes, I.; Larreynaga, J. A.

    2012-04-01

    Tsunamis are relatively infrequent phenomena representing a greater threat than earthquakes, hurricanes and tornadoes, causing the loss of thousands of human lives and extensive damage to coastal infrastructure around the world. Several works have attempted to study these phenomena in order to understand their origin, causes, evolution, consequences, and magnitude of their damages, to finally propose mechanisms to protect coastal societies. Advances in the understanding and prediction of tsunami impacts allow the development of adaptation and mitigation strategies to reduce risk on coastal areas. This work -Tsunami Hazard and Risk Assessment in El Salvador-, funded by AECID during the period 2009-12, examines the state of the art and presents a comprehensive methodology for assessing the risk of tsunamis at any coastal area worldwide and applying it to the coast of El Salvador. The conceptual framework is based on the definition of Risk as the probability of harmful consequences or expected losses resulting from a given hazard to a given element at danger or peril, over a specified time period (European Commission, Schneiderbauer et al., 2004). The HAZARD assessment (Phase I of the project) is based on propagation models for earthquake-generated tsunamis, developed through the characterization of tsunamigenic sources -sismotectonic faults- and other dynamics under study -tsunami waves, sea level, etc.-. The study area is located in a high seismic activity area and has been hit by 11 tsunamis between 1859 and 1997, nine of them recorded in the twentieth century and all generated by earthquakes. Simulations of historical and potential tsunamis with greater or lesser affection to the country's coast have been performed, including distant sources, intermediate and close. Deterministic analyses of the threats under study -coastal flooding- have been carried out, resulting in different hazard maps (maximum wave height elevation, maximum water depth, minimum tsunami

  20. Assessment of cardiovascular risk.

    LENUS (Irish Health Repository)

    Cooney, Marie Therese

    2010-10-01

    Atherosclerotic cardiovascular disease (CVD) is the most common cause of death worldwide. Usually atherosclerosis is caused by the combined effects of multiple risk factors. For this reason, most guidelines on the prevention of CVD stress the assessment of total CVD risk. The most intensive risk factor modification can then be directed towards the individuals who will derive the greatest benefit. To assist the clinician in calculating the effects of these multiple interacting risk factors, a number of risk estimation systems have been developed. This review address several issues regarding total CVD risk assessment: Why should total CVD risk be assessed? What risk estimation systems are available? How well do these systems estimate risk? What are the advantages and disadvantages of the current systems? What are the current limitations of risk estimation systems and how can they be resolved? What new developments have occurred in CVD risk estimation?

  1. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Grand Junction, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Grand Junction, Colorado evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site. This risk assessment follows an approach outlined by the EPA. the first step is to evaluate ground water data collected from monitor wells at the site. Evaluation of these data showed that the contaminants of potential concern in the ground water are arsenic, cadmium, cobalt, fluoride, iron, manganese, molybdenum, nickel, sulfate, uranium, vanadium, zinc, and radium-226. The next step in the risk assessment is to estimate how much of these contaminants people would be exposed to if they drank from a well installed in the contaminated ground water at the former processing site.

  2. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1994-06-01

    This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Grand Junction, Colorado evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site. This risk assessment follows an approach outlined by the EPA. the first step is to evaluate ground water data collected from monitor wells at the site. Evaluation of these data showed that the contaminants of potential concern in the ground water are arsenic, cadmium, cobalt, fluoride, iron, manganese, molybdenum, nickel, sulfate, uranium, vanadium, zinc, and radium-226. The next step in the risk assessment is to estimate how much of these contaminants people would be exposed to if they drank from a well installed in the contaminated ground water at the former processing site

  3. Risk Management and Uncertainty in Large Complex Public Projects

    DEFF Research Database (Denmark)

    Neerup Themsen, Tim; Harty, Chris; Tryggestad, Kjell

    Governmental actors worldwide are promoting risk management as a rational approach to man-age uncertainty and improve the abilities to deliver large complex projects according to budget, time plans, and pre-set project specifications: But what do we know about the effects of risk management...... on the abilities to meet such objectives? Using Callon’s (1998) twin notions of framing and overflowing we examine the implementation of risk management within the Dan-ish public sector and the effects this generated for the management of two large complex pro-jects. We show how the rational framing of risk...... management have generated unexpected costly outcomes such as: the undermining of the longer-term value and societal relevance of the built asset, the negligence of the wider range of uncertainties emerging during project processes, and constraining forms of knowledge. We also show how expert accountants play...

  4. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  5. San Luis Valley - Taos Plateau Landscape-Level Cultural Heritage Values and Risk Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Wescott, Konstance L. [Argonne National Lab. (ANL), Argonne, IL (United States); Abplanalp, Jennifer M. [Argonne National Lab. (ANL), Argonne, IL (United States); Brown, Jeff [Bureau of Land Management, Monte Vista, CO (United States); Cantwell, Brian [Argonne National Lab. (ANL), Argonne, IL (United States); Dicks, Merrill [Bureau of Land Management, Taos, NM (United States); Fredericks, Brian [Bureau of Land Management, Monte Vista, CO (United States); Krall, Angie [US Forest Service, Creede, CO (United States); Rollins, Katherine E. [Argonne National Lab. (ANL), Argonne, IL (United States); Sullivan, Robert [Argonne National Lab. (ANL), Argonne, IL (United States); Valdez, Arnie [Univ. of New Mexico, Albuquerque, NM (United States); Verhaaren, Bruce [Argonne National Lab. (ANL), Argonne, IL (United States); Vieira, Joseph [Bureau of Land Management, Monte Vista, CO (United States); Walston, Lee [Argonne National Lab. (ANL), Argonne, IL (United States); Zvolanek, Emily A. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-10-01

    The San Luis Valley – Taos Plateau Landscape-Level Cultural Heritage Values and Risk Assessment (hereafter referred to as cultural assessment) is a BLM pilot project designed to see whether the Rapid Ecoregional Assessment (REA) framework (already established and implemented throughout many ecoregions in the West) can be applied to the cultural environment.

  6. Regional Assessment of Supplementation Project

    International Nuclear Information System (INIS)

    1991-10-01

    The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) prescribes several approaches to achieve its goal of doubling the salmon and steelhead runs of the Columbia River. Among those approaches are habitat restoration, improvements in adult and juvenile passage at dams and artificial propagation. Supplementation will be a major part of the new hatchery programs. The purpose of the Regional Assessment of Supplementation Project (RASP) is to provide an overview of ongoing and planned supplementation activities, to construct a conceptual framework and model for evaluating the potential benefits and risks of supplementation and to develop a plan for better regional coordination of research and monitoring and evaluation of supplementation. RASP has completed its first year of work. Progress toward meeting the first year's objectives and recommendations for future tasks are contained in this report

  7. Statistically based uncertainty assessments in nuclear risk analysis

    International Nuclear Information System (INIS)

    Spencer, F.W.; Diegert, K.V.; Easterling, R.G.

    1987-01-01

    Over the last decade, the problems of estimation and uncertainty assessment in probabilistics risk assessment (PRAs) have been addressed in a variety of NRC and industry-sponsored projects. These problems have received attention because of a recognition that major uncertainties in risk estimation exist, which can be reduced by collecting more and better data and other information, and because of a recognition that better methods for assessing these uncertainties are needed. In particular, a clear understanding of the nature and magnitude of various sources of uncertainty is needed to facilitate descision-making on possible plant changes and research options. Recent PRAs have employed methods of probability propagation, sometimes involving the use of Bayes Theorem, and intended to formalize the use of ''engineering judgment'' or ''expert opinion.'' All sources, or feelings, of uncertainty are expressed probabilistically, so that uncertainty analysis becomes simply a matter of probability propagation. Alternatives to forcing a probabilistic framework at all stages of a PRA are a major concern in this paper, however

  8. Assessing social and economic effects of perceived risk: Workshop summary: Draft: BWIP Repository Project. [Basalt Waste Isolation Program

    Energy Technology Data Exchange (ETDEWEB)

    Nealey, S.M.; Liebow, E.B. (eds.)

    1988-03-01

    The US Department of Energy sponsored a one-day workshop to discuss the complex dimensions of risk judgment formation and the assessment of social and economic effects of risk perceptions related to the permanent underground storage of highly radioactive waste from commercial nuclear power plants. Affected parties have publicly expressed concerns about potentially significant risk-related effects of this approach to waste management. A selective review of relevant literature in psychology, decision analysis, economics, sociology, and anthropology was completed, along with an examination of decision analysis techniques that might assist in developing suitable responses to public risk-related concerns. The workshop was organized as a forum in which a set of distinguished experts could exchange ideas and observations about the problems of characterizing the effects of risk judgments. Out of the exchange emerged the issues or themes of problems with probabilistic risk assessment techniques are evident; differences exist in the way experts and laypersons view risk, and this leads to higher levels of public concern than experts feel are justified; experts, risk managers, and decision-makers sometimes err in assessing risk and in dealing with the public; credibility and trust are important contributing factors in the formation of risk judgments; social and economic consequences of perceived risk should be properly anticipated; improvements can be made in informing the public about risk; the role of the public in risk assessment, risk management and decisions about risk should be reconsidered; and mitigation and compensation are central to resolving conflicts arising from divergent risk judgments. 1 tab.

  9. Adapting social impact assessment to address a project's human rights impacts and risks

    NARCIS (Netherlands)

    Esteves, Ana Maria; Factor, Gabriela; Vanclay, Frank; Gotzmann, Nora; Moreira, Sergio

    2017-01-01

    We address the weaknesses inherent in the social risk assessments undertaken for business, especially hi the extractive industries. In contrast to the conventional approach that considers consequence to the company rather than to impacted communities, conformance with the United Nations Guiding

  10. Baseline risk assessment of ground water contamination at the inactive uriniferous lignite ashing site near Belfield, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-08-01

    This Baseline Risk Assessment of Ground Water Contamination at the Inactive Uraniferous Lignite Ashing Site Near Belfield, North Dakota, evaluates potential impacts to public health or the environment resulting from ground water contamination at the site where coal containing uranium was burned to produce uranium. The US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project is evaluating plans to remedy soil and ground water contamination at the site. Phase I of the UMTRA Project consists of determining the extent of soil contamination. Phase II of the UMTRA Project consists of evaluating ground water contamination. Under Phase II, results of this risk assessment will help determine what remedial actions may be necessary for contaminated ground water at the site. This risk assessment evaluates the potential risks to human health and the environment resulting from exposure to contaminated ground water as it relates to historic processing activities at the site. Potential risk is quantified for constituents introduced from the processing activities, and not for those constituents naturally occurring in water quality in the site vicinity. Background ground water quality has the potential to cause adverse health effects from exposure through drinking. Any risks associated with contaminants attributable to site activities are incremental to these risks from background ground water quality. This incremental risk from site-related contaminants is quantified in this risk assessment. The baseline risk from background water quality is incorporated only into the assessment of potential chemical interactions and the definition of the overall site condition.

  11. Baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Belfield, North Dakota

    International Nuclear Information System (INIS)

    1994-08-01

    This Baseline Risk Assessment of Ground Water Contamination at the Inactive Uraniferous Lignite Ashing Site Near Belfield, North Dakota, evaluates potential impacts to public health or the environment resulting from ground water contamination at the site where coal containing uranium was burned to produce uranium. The US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project is evaluating plans to remedy soil and ground water contamination at the site. Phase I of the UMTRA Project consists of determining the extent of soil contamination. Phase II of the UMTRA Project consists of evaluating ground water contamination. Under Phase II, results of this risk assessment will help determine what remedial actions may be necessary for contaminated ground water at the site. This risk assessment evaluates the potential risks to human health and the environment resulting from exposure to contaminated ground water as it relates to historic processing activities at the site. Potential risk is quantified for constituents introduced from the processing activities, and not for those constituents naturally occurring in water quality in the site vicinity. Background ground water quality has the potential to cause adverse health effects from exposure through drinking. Any risks associated with contaminants attributable to site activities are incremental to these risks from background ground water quality. This incremental risk from site-related contaminants is quantified in this risk assessment. The baseline risk from background water quality is incorporated only into the assessment of potential chemical interactions and the definition of the overall site condition

  12. Evaluation of indicators for desertification risk assessment in part of ...

    Indian Academy of Sciences (India)

    47

    The proposed methodology provides a series of effective indicators that would .... was made in the context of the 'MEDALUS' research project (Kosmas et al. 1999). ... The district experiences arid to semi-arid type of climate with average annual rainfall ..... In the present study qualitative desertification risk assessment has.

  13. Surging Seas Risk Finder: A Tool for Local-Scale Flood Risk Assessments in Coastal Cities

    Science.gov (United States)

    Kulp, S. A.; Strauss, B.

    2015-12-01

    Local decision makers in coastal cities require accurate, accessible, and thorough assessments of flood exposure risk within their individual municipality, in their efforts to mitigate against damage due to future sea level rise. To fill this need, we have developed Climate Central's Surging Seas Risk Finder, an interactive data toolkit which presents our sea level rise and storm surge analysis for every coastal town, city, county, and state within the USA. Using this tool, policy makers can easily zoom in on their local place of interest to receive a detailed flood risk assessment, which synthesizes a wide range of features including total population, socially vulnerable population, housing, property value, road miles, power plants, schools, hospitals, and many other critical facilities. Risk Finder can also be used to identify specific points of interest in danger of exposure at different flood levels. Additionally, this tool provides localized storm surge probabilities and sea level rise projections at tidal gauges along the coast, so that users can quickly understand the risk of flooding in their area over the coming decades.

  14. Risk assessment for produced water discharges to Louisiana open bays. Final report

    International Nuclear Information System (INIS)

    Meinhold, A.F.; DePhillips, M.P.; Holtzman, S.

    1996-01-01

    The US Department of Energy (USDOE) has a program of research in the environmental aspects of oil and gas extraction. This sampling project will characterize the environmental impacts associated with the discharge of naturally occurring radioactive materials (NORM), metals and organics in produced water. This report is part of a series of studies of the health and ecological risks from discharges of produced water to the Gulf of Mexico, supported by the USDOE. These assessments are being coordinated with the field study, using the collected data to perform human health and ecological risk assessments. These assessments will provide input to regulators in the development of guidelines and permits, and to industry in the development and use of appropriate discharge practices. The initial human health and ecological risk assessments consist of conservative screening analyses meant to identify potentially important contaminants, and to eliminate others from further consideration. More quantitative assessments were done for contaminants identified, in the screening analysis, as being of potential concern. Section 2 gives an overview of human health and ecological risk assessment to help put the analyses presented here in perspective. Section 3 provides the hazard assessment portion of the risk assessment, and identifies the important receptors and pathways of concern. Section 3 also outlines the approach taken to the risk assessments presented in the rest of the report. The remaining sections (4 through 9) present the human health and ecological risk assessments for discharges of produced water to open bays in Louisiana

  15. Component fragility analysis methodology for seismic risk assessment projects. Proven PSA safety document processing and assessment procedures

    International Nuclear Information System (INIS)

    Kolar, Ladislav

    2013-03-01

    The seismic risk task assessment task should be structured as follows: (i) Define all reactor unit building structures, components and equipment involved in the creation of an initiating event (IE) induced by an seismic event or contributing to the reliability of reactor unit response to an IE; (ii) construct and estimate of the fragility curves for the building and component groups sub (i); (iii) determine the HCLPF for each group of buildings, components or equipment; (iv) determine the nuclear source's seismic resistance (SME) as the minimum HCLPF from the group of equipment in the risk-dominant scenarios; (v) define the risk-limiting group of components, equipment and building structures to the SME value; (vi) based on the fragility levels, identify component groups for which a more detailed fragility analysis is needed; and (vii) recommend groups of equipment or building structures that should be taken into account with respect to the seismic risk, i.e. such groups of equipment or building structures as exhibit a low seismic resistance (HCLPF) and, at the same time, are involved to a significant extent in the reactor unit's seismic risk (are present in the dominant risk scenarios). (P.A.)

  16. Risk management in a large-scale CO2 geosequestration pilot project, Illinois, USA

    Science.gov (United States)

    Hnottavange-Telleen, K.; Chabora, E.; Finley, R.J.; Greenberg, S.E.; Marsteller, S.

    2011-01-01

    Like most large-scale infrastructure projects, carbon dioxide (CO 2) geological sequestration (GS) projects have multiple success criteria and multiple stakeholders. In this context "risk evaluation" encompasses multiple scales. Yet a risk management program aims to maximize the chance of project success by assessing, monitoring, minimizing all risks in a consistent framework. The 150,000-km2 Illinois Basin underlies much of the state of Illinois, USA, and parts of adjacent Kentucky and Indiana. Its potential for CO2 storage is first-rate among basins in North America, an impression that has been strengthened by early testing of the injection well of the Midwest Geological Sequestration Consortium's (MGSC's) Phase III large scale demonstration project, the Illinois Basin - Decatur Project (IBDP). The IBDP, funded by the U.S. Department of Energy's National Energy Technology Laboratory (NETL), represents a key trial of GS technologies and project-management techniques. Though risks are specific to each site and project, IBDP risk management methodologies provide valuable experience for future GS projects. IBDP views risk as the potential for negative impact to any of these five values: health and safety, environment, financial, advancing the viability and public acceptability of a GS industry, and research. Research goals include monitoring one million metric tonnes of injected CO2 in the subsurface. Risk management responds to the ways in which any values are at risk: for example, monitoring is designed to reduce uncertainties in parameter values that are important for research and system control, and is also designed to provide public assurance. Identified risks are the primary basis for risk-reduction measures: risks linked to uncertainty in geologic parameters guide further characterization work and guide simulations applied to performance evaluation. Formally, industry defines risk (more precisely risk criticality) as the product L*S, the Likelihood multiplied

  17. Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability

    Directory of Open Access Journals (Sweden)

    Huiru Zhao

    2015-03-01

    Full Text Available In order to achieve the sustainable development of energy, Ultra High Voltage (UHV power transmission construction projects are being established in China currently. Their high-tech nature, the massive amount of money involved, and the need for multi-agent collaboration as well as complex construction environments bring many challenges and risks. Risk management, therefore, is critical to reduce the risks and realize sustainable development of projects. Unfortunately, many traditional risk assessment methods may not perform well due to the great uncertainty and randomness inherent in UHV power construction projects. This paper, therefore, proposes a risk evaluation index system and a hybrid risk evaluation model to evaluate the risk of UHV projects and find out the key risk factors. This model based on a cloud model and fuzzy comprehensive evaluation (FCE method combines the superiority of the cloud model for reflecting randomness and discreteness with the advantages of the fuzzy comprehensive evaluation method in handling uncertain and vague issues. For the sake of proving our framework, an empirical study of “Zhejiang-Fuzhou” UHV power transmission construction project is presented. As key contributions, we find the risk of this project lies at a “middle” to “high” level and closer to a “middle” level; the “management risk” and “social risk” are identified as the most important risk factors requiring more attention; and some risk control recommendations are proposed. This article demonstrates the value of our approach in risk identification, which seeks to improve the risk control level and the sustainable development of UHV power transmission construction projects.

  18. RISK MANAGEMENT IN A LARGE-SCALE NEW RAILWAY TRANSPORT SYSTEM PROJECT

    Directory of Open Access Journals (Sweden)

    Sunduck D. SUH, Ph.D., P.E.

    2000-01-01

    Full Text Available Risk management experiences of the Korean Seoul-Pusan high-speed railway (KTX project since the planning stage are evaluated. One can clearly see the interplay of engineering and construction risks, financial risks and political risks in the development of the KTX project, which is the peculiarity of large-scale new railway system projects. A brief description on evaluation methodology and overview of the project is followed by detailed evaluations on key differences in risks between conventional railway system and high-speed railway system, social and political risks, engineering and construction risks, and financial risks. Risks involved in system procurement process, such as proposal solicitation, evaluation, selection, and scope of solicitation are separated out and evaluated in depth. Detailed events resulting from these issues are discussed along with their possible impact on system risk. Lessons learned and further possible refinements are also discussed.

  19. 76 FR 31329 - EPA Radiogenic Cancer Risk Models and Projections for the U.S. Population (Blue Book)

    Science.gov (United States)

    2011-05-31

    ... Models and Projections for the U.S. Population (Blue Book) AGENCY: Environmental Protection Agency (EPA...-11-001, April 2011), also known as the Blue Book, which provides radiation risk assessment methodology. EPA will use the scientific information on radiation risks provided in the Blue Book, together...

  20. Information needs for risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

    1990-12-31

    Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

  1. Final report of the project performance assessment and economic evaluation of nuclear waste management

    International Nuclear Information System (INIS)

    Rasilainen, K.; Anttila, M.; Hautojaervi, A.

    1993-05-01

    The publication is the final report of project Performance Assessment and Economic Evaluation of Nuclear Waste Management (TOKA) at the Nuclear Engineering Laboratory of VTT (Technical Research Centre of Finland), forming part of the Publicly Financed Nuclear Waste Management Research Programme (JYT). The project covers safety and cost aspects of all phases of nuclear waste management. The main emphasis has been on developing an integrated system of models for performance assessment of nuclear waste repositories. During the four years the project has so far been in progress, the total amount of work has been around 14 person-years. Computer codes are the main tools in the project, they are either developed by the project team or acquired from abroad. In-house model development has been especially active in groundwater flow, near-field and migration modelling. The quantitative interpretation of Finnish tracer experiments in the laboratory and natural analogue studies at Palmottu support performance assessments via increased confidence in the migration concepts used. The performance assessment philosophy adopted by the team consists of deterministic modelling and pragmatic scenario analysis. This is supported by the long-term experience in practical performance assessment of the team, and in theoretical probabilistic modelling exercises. The radiological risks of spent fuel transportation from the Loviisa nuclear power plant to Russia have been analysed using a probabilistic computer code and Finnish traffic accident statistics. The project assists the authorities in the annual assessment of utility estimates of funding needs for future nuclear waste management operations. The models and methods used within the project are tested in international verification/validation projects

  2. Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)

    Science.gov (United States)

    Thigpen, Eric B.; Boyer, Roger L.; Stewart, Michael A.; Fougere, Pete

    2017-01-01

    The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

  3. Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project

    Directory of Open Access Journals (Sweden)

    Muhammed Mufazzal Hossen

    2015-04-01

    The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

  4. A review of regulatory risk assessment with formaldehyde as an example.

    Science.gov (United States)

    Imbus, H R

    1988-09-01

    Quantitative risk assessment may vary by over a millionfold depending upon the model used. The EPA currently uses models which project the highest potential risk. Furthermore, there is no consideration of the probability that a chemical is a human carcinogen. Such an approach may result in unrealistically high risk at exposures far below current ambient levels. In the case of formaldehyde, three alternative approaches to risk assessment are examined. One uses the maximum likelihood estimate of the multistage model, another uses the no observable adverse effect level divided by a safety factor of 100, and the third uses a probability estimate that the substance is carcinogenic at typical ambient exposures multiplied by EPA's upper bound estimate. The probability estimate is made from considerations of metabolism and pharmacokinetics, toxicology, short-term tests, animal tests, and epidemiology.

  5. Probabilistic risk assessment as an aid to risk management

    International Nuclear Information System (INIS)

    Garrick, B.J.

    1982-01-01

    Probabilistic risk assessments are providing important insights into nuclear power plant safety. Their value is two-fold: first as a means of quantifying nuclear plant risk including contributors to risk, and second as an aid to risk management. A risk assessment provides an analytical plant model that can be the basis for performing meaningful decision analyses for controlling safety. It is the aspect of quantitative risk management that makes probabilistic risk assessment an important technical discipline of the future

  6. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  7. Risk vs. Reward: A Methodology to Assess Investment in Marine Energy

    Directory of Open Access Journals (Sweden)

    John Hutcheson

    2016-08-01

    Full Text Available The majority of WEC (wave energy converter projects are expensive and pose a large risk to a developer. Currently no developers have been successful in commercialising a WEC. So far, many wave energy feasibility studies have only considered the LCOE (levelised cost of electricity, assessing investment in marine energy technologies from a purely financial point of view. No previous studies have, however, explicitly accounted for development risk as well as the LCOE to determine the feasibility of a project. This paper proposes a new methodology that can be used to account for both risk and the LCOE to give a clearer picture of the feasibility of a WEC development. By combining the LCOE and risk score for a particular development, the “value for risk” can be calculated, presented here as the “RR ratio” (“Risk/Reward ratio”. A number of case studies were chosen to test the model, investigating the RR ratio for a number of different WEC technologies and ranking them to suggest an optimal development path for the industry. Results showed that projects that combine many innovative technologies provide the best “value for risk”. These devices overall had the highest risk, suggesting that multiple developers are likely required to collaborate in order to reduce the risk down to acceptable levels for each.

  8. Bayesian-network-based safety risk analysis in construction projects

    International Nuclear Information System (INIS)

    Zhang, Limao; Wu, Xianguo; Skibniewski, Miroslaw J.; Zhong, Jingbing; Lu, Yujie

    2014-01-01

    This paper presents a systemic decision support approach for safety risk analysis under uncertainty in tunnel construction. Fuzzy Bayesian Networks (FBN) is used to investigate causal relationships between tunnel-induced damage and its influential variables based upon the risk/hazard mechanism analysis. Aiming to overcome limitations on the current probability estimation, an expert confidence indicator is proposed to ensure the reliability of the surveyed data for fuzzy probability assessment of basic risk factors. A detailed fuzzy-based inference procedure is developed, which has a capacity of implementing deductive reasoning, sensitivity analysis and abductive reasoning. The “3σ criterion” is adopted to calculate the characteristic values of a triangular fuzzy number in the probability fuzzification process, and the α-weighted valuation method is adopted for defuzzification. The construction safety analysis progress is extended to the entire life cycle of risk-prone events, including the pre-accident, during-construction continuous and post-accident control. A typical hazard concerning the tunnel leakage in the construction of Wuhan Yangtze Metro Tunnel in China is presented as a case study, in order to verify the applicability of the proposed approach. The results demonstrate the feasibility of the proposed approach and its application potential. A comparison of advantages and disadvantages between FBN and fuzzy fault tree analysis (FFTA) as risk analysis tools is also conducted. The proposed approach can be used to provide guidelines for safety analysis and management in construction projects, and thus increase the likelihood of a successful project in a complex environment. - Highlights: • A systemic Bayesian network based approach for safety risk analysis is developed. • An expert confidence indicator for probability fuzzification is proposed. • Safety risk analysis progress is extended to entire life cycle of risk-prone events. • A typical

  9. Projection models for health-effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume I. Introduction to the SPAHR demographic model for health risk

    Energy Technology Data Exchange (ETDEWEB)

    Collins, J.J.; Lundy, R.T.; Grahn, D.; Ginevan, M.E.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projections. The model extends several health risk projection models by making realistic assumptions about the population at risk, and thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. The first volume presents the theory behind the SPAHR health risk projection model and several applications of the model to actual pollution episodes. The elements required for an effective health risk projection model are specified, and the models that have been used to date in health risk projections are outlined. These are compared with the demographic model, whose formulation is described in detail. Examples of the application of air pollution and radiation dose-response functions are included in order to demonstrate the estimation of future mortality and morbidity levels and the range of variation in excess deaths that occurs when populations structure is changed.

  10. Projection models for health-effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume I. Introduction to the SPAHR demographic model for health risk

    International Nuclear Information System (INIS)

    Collins, J.J.; Lundy, R.T.; Grahn, D.; Ginevan, M.E.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projections. The model extends several health risk projection models by making realistic assumptions about the population at risk, and thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. The first volume presents the theory behind the SPAHR health risk projection model and several applications of the model to actual pollution episodes. The elements required for an effective health risk projection model are specified, and the models that have been used to date in health risk projections are outlined. These are compared with the demographic model, whose formulation is described in detail. Examples of the application of air pollution and radiation dose-response functions are included in order to demonstrate the estimation of future mortality and morbidity levels and the range of variation in excess deaths that occurs when populations structure is changed

  11. The role of uncertainty analysis in dose reconstruction and risk assessment

    International Nuclear Information System (INIS)

    Hoffman, F.O.; Simon, S.L.; Thiessen. K.M.

    1996-01-01

    Dose reconstruction and risk assessment rely heavily on the use of mathematical models to extrapolate information beyond the realm of direct observation. Because models are merely approximations of real systems, their predictions are inherently uncertain. As a result, full disclosure of uncertainty in dose and risk estimates is essential to achieve scientific credibility and to build public trust. The need for formal analysis of uncertainty in model predictions was presented during the nineteenth annual meeting of the NCRP. At that time, quantitative uncertainty analysis was considered a relatively new and difficult subject practiced by only a few investigators. Today, uncertainty analysis has become synonymous with the assessment process itself. When an uncertainty analysis is used iteratively within the assessment process, it can guide experimental research to refine dose and risk estimates, deferring potentially high cost or high consequence decisions until uncertainty is either acceptable or irreducible. Uncertainty analysis is now mandated for all ongoing dose reconstruction projects within the United States, a fact that distinguishes dose reconstruction from other types of exposure and risk assessments. 64 refs., 6 figs., 1 tab

  12. Global challenges in the risk assessment of nanomaterials: Relevance to South Africa

    Directory of Open Access Journals (Sweden)

    Mary Gulumian

    2012-09-01

    Full Text Available Internationally, there are efforts to develop standardised toxicity testing and risk assessmentmethods for engineered nanomaterials (ENMs. To this end, health risk assessments need tobe conducted on ENMs synthesised in South Africa. Country-specific risk characterisationrequires specific exposure assessments for those ENMs for which the likelihood exists foroccupational and environmental exposure in that country. A challenge in hazard identificationand risk assessment related to ENMs, regardless of country of origin, is that data on toxicity,carcinogenicity, pharmacokinetics, and occupational or environmental exposure are generallynot available for most ENMs. Although the mechanisms previously identified as importantin the toxicity and carcinogenicity of particles and fibres may be applicable, the possibilityexists that the unusual physicochemical properties of ENMs may give rise to unique, andas yet unidentified, adverse effects. Moreover, generalised exposure scenarios that considerthe life cycle of the agent have not been developed and are needed for the complete riskcharacterisation of ENMs. As health risk assessment is both resource and labour intensive, it isimperative to identify the aims of such an exercise prior to embarking on large-scale projects,to ensure that the data most useful for public health decision-making is provided. Identifyingpriorities in South Africa, in coordination with international efforts, can facilitate the effectiveuse of research efforts for risk assessment and risk management decision-making.

  13. Methodology of environmental risk assessment management

    Directory of Open Access Journals (Sweden)

    Saša T. Bakrač

    2012-04-01

    Full Text Available Successful protection of environment is mostly based on high-quality assessment of potential and present risks. Environmental risk management is a complex process which includes: identification, assessment and control of risk, namely taking measures in order to minimize the risk to an acceptable level. Environmental risk management methodology: In addition to these phases in the management of environmental risk, appropriate measures that affect the reduction of risk occurrence should be implemented: - normative and legal regulations (laws and regulations, - appropriate organizational structures in society, and - establishing quality monitoring of environment. The emphasis is placed on the application of assessment methodologies (three-model concept, as the most important aspect of successful management of environmental risk. Risk assessment methodology - European concept: The first concept of ecological risk assessment methodology is based on the so-called European model-concept. In order to better understand this ecological risk assessment methodology, two concepts - hazard and risk - are introduced. The European concept of environmental risk assessment has the following phases in its implementation: identification of hazard (danger, identification of consequences (if there is hazard, estimate of the scale of consequences, estimate of consequence probability and risk assessment (also called risk characterization. The European concept is often used to assess risk in the environment as a model for addressing the distribution of stressors along the source - path - receptor line. Risk assessment methodology - Canadian concept: The second concept of the methodology of environmental risk assessment is based on the so-called Canadian model-concept. The assessment of ecological risk includes risk arising from natural events (floods, extreme weather conditions, etc., technological processes and products, agents (chemical, biological, radiological, etc

  14. Improving the use of crop models for risk assessment and climate change adaptation.

    Science.gov (United States)

    Challinor, Andrew J; Müller, Christoph; Asseng, Senthold; Deva, Chetan; Nicklin, Kathryn Jane; Wallach, Daniel; Vanuytrecht, Eline; Whitfield, Stephen; Ramirez-Villegas, Julian; Koehler, Ann-Kristin

    2018-01-01

    Crop models are used for an increasingly broad range of applications, with a commensurate proliferation of methods. Careful framing of research questions and development of targeted and appropriate methods are therefore increasingly important. In conjunction with the other authors in this special issue, we have developed a set of criteria for use of crop models in assessments of impacts, adaptation and risk. Our analysis drew on the other papers in this special issue, and on our experience in the UK Climate Change Risk Assessment 2017 and the MACSUR, AgMIP and ISIMIP projects. The criteria were used to assess how improvements could be made to the framing of climate change risks, and to outline the good practice and new developments that are needed to improve risk assessment. Key areas of good practice include: i. the development, running and documentation of crop models, with attention given to issues of spatial scale and complexity; ii. the methods used to form crop-climate ensembles, which can be based on model skill and/or spread; iii. the methods used to assess adaptation, which need broadening to account for technological development and to reflect the full range options available. The analysis highlights the limitations of focussing only on projections of future impacts and adaptation options using pre-determined time slices. Whilst this long-standing approach may remain an essential component of risk assessments, we identify three further key components: 1.Working with stakeholders to identify the timing of risks. What are the key vulnerabilities of food systems and what does crop-climate modelling tell us about when those systems are at risk?2.Use of multiple methods that critically assess the use of climate model output and avoid any presumption that analyses should begin and end with gridded output.3.Increasing transparency and inter-comparability in risk assessments. Whilst studies frequently produce ranges that quantify uncertainty, the assumptions

  15. Risk assessments for the disposal of high level radioactive wastes

    International Nuclear Information System (INIS)

    Smith, C.F.

    1975-01-01

    The risks associated with the disposal of high level wastes derive from the potential for release of radioactive materials into the environment. The assessment of these risks requires a methodology for risk analysis, an identification of the radioactive sources, and a method by which to express the relative hazard of the various radionuclides that comprise the high level waste. The development of a methodology for risk analysis is carried out after a review of previous work in the area of probabilistic risk assessment. The methodology suggested involves the probabilistic analysis of a general accident consequence distribution. In this analysis, the frequency aspect of the distribution is treated separately from the normalized probability function. At the final stage of the analysis, the frequency and probability characteristics of the distribution are recombined to provide an estimate of the risk. The characterization of the radioactive source term is accomplished using the ORIGEN computer code. Calculations are carried out for various reactor types and fuel cycles, and the overall waste hazard for a projected thirty-five year nuclear power program is determined

  16. The use of intelligent systems for risk management in software projects

    Directory of Open Access Journals (Sweden)

    Oksana A. Gushchina

    2017-06-01

    Full Text Available Introduction: The article identifies the main risks of a software project, examines the use of different types of intelligent systems in the risk management process for software projects, discusses the basic methods used for process estimation and forecasting in the field of software engineering, identifies currently used empty expert systems, software systems for analysis and risk management of software projects. Materials and Methods: The author describes the peculiarities of risk management in the field of software engineering with involvement of intelligent systems. The intelligent techniques allow solving the control task with expert precision without the involvement of human experts. Results: The result of this work: – identification of the key risks of a software project (tax, legal, financial and commercial risks, IT risks, personnel risks, risks related to competitors, suppliers, marketing and demand and market; – investigation of the current, applied to risk management of software system projects, artificial intelligence, particularly expert systems and software tools for evaluation of the process results; – identification of the most popular empty expert systems (Clips, G2 and Leonardo and software products of the analysis of large databases (Orange, Weka, Rattle GUI, Apache Mahout, SCaViS, RapidMiner, Databionic ESOM Tools, ELKI, KNIME, Pandas and UIMA; – consideration of the cluster, correlation, regression, factor and dispersion analysis methods for the estimation and prediction of the processes of software engineering. Discussion and Conclusions: The results show the feasibility of the application of various intelligent systems in the risk management process. The analysis of methods of evaluating risks and the tendency of their application in the modern systems of intellectual analysis can serve as a start point for creating a unified system of risk management for software projects of medium and high complexity with a

  17. Transparent Global Seismic Hazard and Risk Assessment

    Science.gov (United States)

    Smolka, Anselm; Schneider, John; Pinho, Rui; Crowley, Helen

    2013-04-01

    Vulnerability to earthquakes is increasing, yet advanced reliable risk assessment tools and data are inaccessible to most, despite being a critical basis for managing risk. Also, there are few, if any, global standards that allow us to compare risk between various locations. The Global Earthquake Model (GEM) is a unique collaborative effort that aims to provide organizations and individuals with tools and resources for transparent assessment of earthquake risk anywhere in the world. By pooling data, knowledge and people, GEM acts as an international forum for collaboration and exchange, and leverages the knowledge of leading experts for the benefit of society. Sharing of data and risk information, best practices, and approaches across the globe is key to assessing risk more effectively. Through global projects, open-source IT development and collaborations with more than 10 regions, leading experts are collaboratively developing unique global datasets, best practice, open tools and models for seismic hazard and risk assessment. Guided by the needs and experiences of governments, companies and citizens at large, they work in continuous interaction with the wider community. A continuously expanding public-private partnership constitutes the GEM Foundation, which drives the collaborative GEM effort. An integrated and holistic approach to risk is key to GEM's risk assessment platform, OpenQuake, that integrates all above-mentioned contributions and will become available towards the end of 2014. Stakeholders worldwide will be able to calculate, visualise and investigate earthquake risk, capture new data and to share their findings for joint learning. Homogenized information on hazard can be combined with data on exposure (buildings, population) and data on their vulnerability, for loss assessment around the globe. Furthermore, for a true integrated view of seismic risk, users can add social vulnerability and resilience indices to maps and estimate the costs and benefits

  18. Assessing the risk of carbon dioxide emissions from blue carbon ecosystems

    KAUST Repository

    Lovelock, Catherine E.; Atwood, Trisha; Baldock, Jeff; Duarte, Carlos M.; Hickey, Sharyn; Lavery, Paul S.; Masque, Pere; Macreadie, Peter I.; Ricart, Aurora M.; Serrano, Oscar; Steven, Andy

    2017-01-01

    to the atmosphere in the form of CO. We present a framework to help assess the relative risk of CO emissions from degraded soils, thereby supporting inclusion of soil C into blue carbon projects and establishing a means to prioritize management for their carbon

  19. Financial risks in major investment projects

    International Nuclear Information System (INIS)

    Segelod, Esbjoern

    2006-01-01

    We have probably all read about large projects which proved far more expensive than anticipated, projects such as the Channel tunnel which cost 80% more than planned, and the oil pipeline between the oil field in Prudhoe Bay in Northern Alaska and the oil terminal in Vadez in the south which overran its budget by 1,000%. The purpose of this paper is to summarise our knowledge of the risk of cost escalation. Which projects are more likely than others to be hit by cost escalation, and why

  20. Risk Management Improvement of Engineering Projects in Woodworking Industry

    Directory of Open Access Journals (Sweden)

    Simona Bartkutė

    2014-02-01

    Full Text Available Risk is a complex phenomenon that has physical, monetary, cultural and social dimensions. Every company wants tosave money, time, increase quality, optimise manufacturing, but each factor may involve different risks with different influenceto company, its reputation. The aim of the research is to find better risk management improvement decisions, using techniquesthat could help to reduce risk impact in wood-based nonstandard production with shorter project time, smoother design process,lower costs, better project coordination, increased ability to manage problems, technical solutions.

  1. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    Science.gov (United States)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  2. Overview of risk assessment

    International Nuclear Information System (INIS)

    Rimington, J.D.

    1992-01-01

    The paper begins by defining some terms, and then refer to a number of technical and other difficulties. Finally it attempts to set out why risk assessment is important and what its purposes are. 2) First, risk and risk assessment - what are they?. 3) Risk is a subject of universal significance. Life is very uncertain, and we can achieve no object or benefit in it except by approaching nearer to particular hazards which lie between us and our objects. That approach represents acceptance of risk. 4) Risk assessment is a way of systematising our approach to hazard with a view to determining what is more and what is less risky. It helps us in the end to diminish our exposure while obtaining whatever benefits we have in mind, or to optimise the risks and the benefits

  3. Overview of risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Rimington, J D [Health and Safety Executive (United Kingdom)

    1992-07-01

    The paper begins by defining some terms, and then refer to a number of technical and other difficulties. Finally it attempts to set out why risk assessment is important and what its purposes are. 2) First, risk and risk assessment - what are they?. 3) Risk is a subject of universal significance. Life is very uncertain, and we can achieve no object or benefit in it except by approaching nearer to particular hazards which lie between us and our objects. That approach represents acceptance of risk. 4) Risk assessment is a way of systematising our approach to hazard with a view to determining what is more and what is less risky. It helps us in the end to diminish our exposure while obtaining whatever benefits we have in mind, or to optimise the risks and the benefits.

  4. Quantitative assessment of exposure and risk for three carcinogenics in long-standing pollution sites

    International Nuclear Information System (INIS)

    Wichmann, H.E.; Wuppertal Univ.; Ihme, W.; Mekel, O.C.L.; Wuppertal Univ.

    1993-01-01

    The project attempts a quantitative assessment of risks for three carcinogenics that are common in sites of long-standing pollution. Benzo(a)pyrene stands for the group of polycyclic aromatic hydrocarbons, cadmium for heavy metals, and benzene for volatile aromatic compounds. The report discusses the general fundamentals of exposure and risk assessment. The exposure model is described in detail and applied to the three test substances. (orig./MG) [de

  5. [Urban ecological risk assessment: a review].

    Science.gov (United States)

    Wang, Mei-E; Chen, Wei-Ping; Peng, Chi

    2014-03-01

    With the development of urbanization and the degradation of urban living environment, urban ecological risks caused by urbanization have attracted more and more attentions. Based on urban ecology principles and ecological risk assessment frameworks, contents of urban ecological risk assessment were reviewed in terms of driven forces, risk resources, risk receptors, endpoints and integrated approaches for risk assessment. It was suggested that types and degrees of urban economical and social activities were the driven forces for urban ecological risks. Ecological functional components at different levels in urban ecosystems as well as the urban system as a whole were the risk receptors. Assessment endpoints involved in changes of urban ecological structures, processes, functional components and the integrity of characteristic and function. Social-ecological models should be the major approaches for urban ecological risk assessment. Trends for urban ecological risk assessment study should focus on setting a definite protection target and criteria corresponding to assessment endpoints, establishing a multiple-parameter assessment system and integrative assessment approaches.

  6. Hazard assessment and risk management of offshore production chemicals

    International Nuclear Information System (INIS)

    Schobben, H.P.M.; Scholten, M.C.T.; Vik, E.A.; Bakke, S.

    1994-01-01

    There is a clear need for harmonization of the regulations with regard to the use and discharge of drilling and production chemicals in the North Sea. Therefore the CHARM (Chemical Hazard Assessment and Risk Management) model was developed. Both government (of several countries) and industry (E and P and chemical suppliers) participated in the project. The CHARM model is discussed and accepted by OSPARCON. The CHARM model consists of several modules. The model starts with a prescreening on the basis of hazardous properties like persistency, accumulation potential and the appearance on black lists. The core of the model.consists of modules for hazard assessment and risk analysis. Hazard assessment covers a general environmental evaluation of a chemical on the basis of intrinsic properties of that chemical. Risk analysis covers a more specific evaluation of the environmental impact from the use of a production chemical, or a combination of chemicals, under actual conditions. In the risk management module the user is guided to reduce the total risk of all chemicals used on a platform by the definition of measures in the most cost-effective way. The model calculates the environmental impact for the marine environment. Thereto three parts are distinguished: pelagic, benthic and food chain. Both hazard assessment and risk analysis are based on a proportional comparison of an estimated PEC with an estimated NEC. The PEC is estimated from the use, release, dilution and fate of the chemical and the NEC is estimated from the available toxicity data of the chemicals

  7. EC FP6 Siberia-focused Enviro-RISKS Project and its Outcomes

    Science.gov (United States)

    Baklanov, A. A.; Gordov, E. P.

    2009-04-01

    The FP6 Project "Man-induced Environmental Risks: Monitoring, Management and Remediation of Man-made Changes in Siberia" (Enviro-RISKS) strategic objective is to facilitate elaboration of solid scientific background and understanding of man-made associated environmental risks, their influence on all aspects of regional environment and optimal ways for it remediation by means of coordinated initiatives of a range of relevant RTD projects as well as to achieve their improved integration thus giving the projects additional synergy in current activities and potential for practical applications. List of Partners includes 3 leading European research organizations, 6 leading Russian research organizations (5 - located in Siberia) and 1 organization from Kazakhstan. Additionally several Russian and European research organizations joined to the Project as Associated Partners. Scientific background and foundation for the project performance is formed by a number of different levels RTD projects carried out by Partners and devoted to near all aspects of the theme. The set comprise coordinated/performed by partners EC funded thematic international projects, Russian national projects and other projects performed by NIS partners. Project outcomes include, in particular, development and support of the bilingual Enviro-RISKS web portal (http://risks.scert.ru/) as the major tool for disseminations of environmental information and project results; achieved level of development of Siberia Integrated Regional Study (SIRS, http://sirs.scert.ru/), which is the Siberia-focused NEESPI Environmental Mega-Project ongoing under the auspices of the Siberian Branch of the Russian Academy of Sciences. The main Project outcome are Memorandum on the state of the art of environmental RTD activity in Siberia and Recommendations on future environmental RTD activity in Siberia elaborated by four Working Experts Groups working in most important for Siberia Thematic Focuses. Three Thematic Focuses

  8. Use of limited data to construct Bayesian networks for probabilistic risk assessment.

    Energy Technology Data Exchange (ETDEWEB)

    Groth, Katrina M.; Swiler, Laura Painton

    2013-03-01

    Probabilistic Risk Assessment (PRA) is a fundamental part of safety/quality assurance for nuclear power and nuclear weapons. Traditional PRA very effectively models complex hardware system risks using binary probabilistic models. However, traditional PRA models are not flexible enough to accommodate non-binary soft-causal factors, such as digital instrumentation&control, passive components, aging, common cause failure, and human errors. Bayesian Networks offer the opportunity to incorporate these risks into the PRA framework. This report describes the results of an early career LDRD project titled %E2%80%9CUse of Limited Data to Construct Bayesian Networks for Probabilistic Risk Assessment%E2%80%9D. The goal of the work was to establish the capability to develop Bayesian Networks from sparse data, and to demonstrate this capability by producing a data-informed Bayesian Network for use in Human Reliability Analysis (HRA) as part of nuclear power plant Probabilistic Risk Assessment (PRA). This report summarizes the research goal and major products of the research.

  9. An assessment of baseline ecological risks at the Fernald Environmental Management Project, Fernald, Ohio

    International Nuclear Information System (INIS)

    Duke, C.S.; Meyers-Schone, L.; Glum, S.R.; Quaider, W.

    1991-01-01

    The Fernald Environmental Management Project (FEMP), formerly the Feed Materials Production Center (FMPC), is a Department of Energy (DOE) facility located near Cincinnati, Ohio, which produced pure uranium metals from the early 1950s until 1989. DOE is currently conducting a Remedial Investigation/Feasibility Study (RI/FS) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), in order to remediate environmental impacts at the site. DOE is also preparing an environmental impact statement under the National Environmental Policy Act (NEPA) to evaluate environmental impacts of proposed remedial actions. Both CERCLA and NEPA require evaluation of ecological risks of baseline conditions and proposed remedial actions. A preliminary assessment of ecological risks examined the potential effects of FEMP contaminants in one operable unit (OU) at the site, OU5, Environmental Media. Radionuclides of potential concern in OU5 soils include uranium, cesium, radium, strontium, technetium, and thorium. Chemicals detected in terrestrial organisms include aluminum, arsenic, barium, cadmium, lead, mercury, vanadium, and zinc, as well as radionuclides. Chemicals of potential concern in surface water include a variety of metals as well as uranium and technetium. Radionuclides in OU5 do not appear to pose a hazard to terrestrial organisms. Estimated radiation doses to aquatic organisms continually exposed to the maximum uranium concentrations observed in on-property drainages ranged from 40 to 4000 rad per year. However, off-property radionuclide concentrations are very low, and it is unlikely that organisms in streams adjacent to the FEMP are exposed to toxic levels. Maximum arsenic levels in vegetation collected from the FEMP are consistent with values reported in the literature to be toxic to certain plants. However, signs of stress have not been observed in vegetation on or adjacent to the FEMP

  10. [Forensic assessment of violence risk].

    Science.gov (United States)

    Pujol Robinat, Amadeo; Mohíno Justes, Susana; Gómez-Durán, Esperanza L

    2014-03-01

    Over the last 20 years there have been steps forward in the field of scientific research on prediction and handling different violent behaviors. In this work we go over the classic concept of "criminal dangerousness" and the more current of "violence risk assessment". We analyze the evolution of such assessment from the practice of non-structured clinical expert opinion to current actuarial methods and structured clinical expert opinion. Next we approach the problem of assessing physical violence risk analyzing the HCR-20 (Assessing Risk for Violence) and we also review the classic and complex subject of the relation between mental disease and violence. One of the most problematic types of violence, difficult to assess and predict, is sexual violence. We study the different actuarial and sexual violence risk prediction instruments and in the end we advise an integral approach to the problem. We also go through partner violence risk assessment, describing the most frequently used scales, especially SARA (Spouse Assault Risk Assessment) and EPV-R. Finally we give practical advice on risk assessment, emphasizing the importance of having maximum information about the case, carrying out a clinical examination, psychopathologic exploration and the application of one of the described risk assessment scales. We'll have to express an opinion about the dangerousness/risk of future violence from the subject and some recommendations on the conduct to follow and the most advisable treatment. Copyright © 2014 Elsevier España, S.L. All rights reserved.

  11. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  12. The Role and the Effects of Risk Management in IT Projects Success

    Directory of Open Access Journals (Sweden)

    Otniel DIDRAGA

    2013-01-01

    Full Text Available The success of IT projects is influenced by risk and risk management according to the existing project management literature. The paper emphasizes the role of risk management and its contribution to projects success in the existing literature. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2012 from the main IT project management journals and publications. The results are that risk management is a very important component of the project management process and it is assumed implicitly to work in favour of project success. We also performed a quantitative analysis of how risk management processes affect the subjective and objective performance of IT projects in Romanian IT companies.

  13. Nuclear Computerized Library for Assessing Reactor Risk (NUCLARR)

    International Nuclear Information System (INIS)

    Gilmore, W.E.; Blackman, H.S.; Ryan, T.G.

    1986-01-01

    The Nuclear Computerized Library for Assessing Reactor Risk (NUCLARR) program is a multiyear effort sponsored by the NRC and is being conducted at the Idaho National Engineering Laboratory (INEL). The goal of this program is to establish and operate computerized data base management tools for the human reliability data bank specification developed by Comer and Donovan. The NRC and the risk analysis community recognized that implementing a fully functional library would not be feasible, or practical, without the aid of computerized tools for management and manipulation of its data sources. The end users of the NUCLARR can be classified into three categories according to specific needs. The first category is those users interested in reviewing individual data sources for a given situation. The second category of users selects multiple data sources for a specific case, summarizing the information, and performing comparative studies. The last category of users interfaces the NUCLARR with other programming applications, such as other data banks, and simulation models of risk assessment. Project status is provided in the paper

  14. Risk Assessment and Integration Team (RAIT) Portfolio Risk Analysis Strategy

    Science.gov (United States)

    Edwards, Michelle

    2010-01-01

    Impact at management level: Qualitative assessment of risk criticality in conjunction with risk consequence, likelihood, and severity enable development of an "investment policy" towards managing a portfolio of risks. Impact at research level: Quantitative risk assessments enable researchers to develop risk mitigation strategies with meaningful risk reduction results. Quantitative assessment approach provides useful risk mitigation information.

  15. Renewable fuels: Policy effectiveness and project risk

    International Nuclear Information System (INIS)

    Leach, Andrew; Doucet, Joseph; Nickel, Trevor

    2011-01-01

    This paper examines the impact of government policy on the risk profile of a small ethanol production facility. We derive four key results from a simulation model. First, we show that commodity price risk may discourage investment in a project, despite a positive expected rate of return. Second, we show that political uncertainty may have significant impacts on the risk profile of a project. Next, we show that using only production subsidies to attract investors is expensive, since the financial assistance is paid regardless of whether the plant is operating under positive or negative financial conditions. Finally, we show that a capital grant provides a valuable complement to a subsidy, because the grant reduces the amount of value investors must put at risk, and increases their leverage thereby enhancing returns, while the subsidy mitigates commodity price risk. Our results show that compared to a subsidy-only approach, a grant and subsidy combination provides an investment environment with similar downside protection and expected returns for less than 60% of the cost. Further, we show that the two policy tools combined yield a superior investment environment to that created by an equivalent or greater total investment deployed entirely in either of the policy tools without the other. - Research highlights: → We find that government policy may increase both project returns and risk. → We find a policy of capital grants combined with an output price support to be preferred. → Price supports alone will tend to reward those plants which need them the least.

  16. Taking risk assessment and management to the next level - 59395

    International Nuclear Information System (INIS)

    Nelson, Jerel; Morton, Russel Lee; Castillo, Carlos; Dyer, George; Johnson, Natalie; McSwain, James T.; Kruskall, Gary Nick

    2012-01-01

    Document available in abstract form only. Full text of publication follows: A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell into two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact

  17. [Risk Assessment and Risk Management of Chemicals in China].

    Science.gov (United States)

    Wang, Tie-yu; Zhou, Yun-qiao; Li, Qi-feng; Lü, Yong-long

    2016-02-15

    Risk assessment and risk management have been increasingly approved as an effective approach for appropriate disposal and scientific management of chemicals. This study systematically analyzed the risk assessment methods of chemicals from three aspects including health risk, ecological risk and regional risk. Based on the current situation of classification and management towards chemicals in China, a specific framework of risk management on chemicals was proposed by selecting target chemicals, predominant industries and related stakeholders as the objects. The results of the present study will provide scientific support for improving risk assessment and reasonable management of chemicals in China.

  18. Ecological risk assessments for the baseline condition for the Port Hope and Port Granby Projects

    International Nuclear Information System (INIS)

    Hart, D.R.; Kleb, H.

    2006-01-01

    Baseline ecological risk assessments were completed in and around the areas where cleanup of low-level radioactive waste (LLRW) and marginally contaminated soil (MCS) is planned under the Port Hope Area Initiative (PHAI). Both aquatic and terrestrial environments were assessed, in the vicinity of the proposed waste management facilities near Welcome and Port Granby, in locations potentially influenced by LLRW and MCS that will be cleaned up in future, and in reference locations that are not potentially influenced. The calculated doses and risk quotients suggest potential radiation effects for pre-cleanup benthic invertebrates in Port Hope Harbour, for any ducks feeding exclusively in this area, and for soil invertebrates in some other waste sites. In addition, risk quotients suggest potential baseline effects from some elements, particularly uranium and arsenic, in localized areas that are influenced by LLRW and MCS. (author)

  19. Conceptual geoinformation model of natural hazards risk assessment

    Science.gov (United States)

    Kulygin, Valerii

    2016-04-01

    Natural hazards are the major threat to safe interactions between nature and society. The assessment of the natural hazards impacts and their consequences is important in spatial planning and resource management. Today there is a challenge to advance our understanding of how socio-economical and climate changes will affect the frequency and magnitude of hydro-meteorological hazards and associated risks. However, the impacts from different types of natural hazards on various marine and coastal economic activities are not of the same type. In this study, the conceptual geomodel of risk assessment is presented to highlight the differentiation by the type of economic activities in extreme events risk assessment. The marine and coastal ecosystems are considered as the objects of management, on the one hand, and as the place of natural hazards' origin, on the other hand. One of the key elements in describing of such systems is the spatial characterization of their components. Assessment of ecosystem state is based on ecosystem indicators (indexes). They are used to identify the changes in time. The scenario approach is utilized to account for the spatio-temporal dynamics and uncertainty factors. Two types of scenarios are considered: scenarios of using ecosystem services by economic activities and scenarios of extreme events and related hazards. The reported study was funded by RFBR, according to the research project No. 16-35-60043 mol_a_dk.

  20. Noxious facility impact projection: Incorporating the effects of risk aversion

    International Nuclear Information System (INIS)

    Nieves, L.A.

    1993-01-01

    Developing new sites for noxious facilities has become a complex process with many potential pitfalls. In addition to the need to negotiate conditions acceptable to the host community, siting success may depend on the facility proposer's ability to identify a candidate site that not only meets technical requirements, but that is located in a community or region whose population is not highly averse to the risks associated with the type of facility being proposed. Success may also depend on the proposer accurately assessing potential impacts of the facility and offering an equitable compensation package to the people affected by it. Facility impact assessments, as typically performed, include only the effects of changes in population, employment and economic activity associated with facility construction and operation. Because of their scope, such assessments usually show a short-run, net economic benefit for the host region, making the intensely negative public reaction to some types and locations of facilities seem unreasonable. The impact component excluded from these assessments is the long-run economic effect of public perceptions of facility risk and nuisance characteristics. Recent developments in psychological and economic measurement techniques have opened the possibility of correcting this flaw by incorporating public perceptions in projections of economic impacts from noxious facilities

  1. A probabilistic risk assessment of Oconee Unit 3. Executive highlights 60

    International Nuclear Information System (INIS)

    1984-04-01

    In 1980 the Nuclear Safety Analysis Center and Duke Power Co. joined in a project to provide the utility industry with a practical, useful example of the application of probabilistic risk assessment (PRA) methods. PRA is a structured analysis technique that accounts for all the failure possibilities that might conceivably lead to core damage. The technique uses probabilities as discriminators to determine which are most significant. The following were project objectives: to provide the host utility with an analytic model of the plant that describes and estimates the likelihood of failure combinations that could lead to core melt; to evaluate the risks to the plant and to the public; to improve utility capabilities in PRA methods and applications

  2. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  3. A systems framework for national assessment of climate risks to infrastructure

    Science.gov (United States)

    Dawson, Richard J.; Thompson, David; Johns, Daniel; Wood, Ruth; Darch, Geoff; Chapman, Lee; Hughes, Paul N.; Watson, Geoff V. R.; Paulson, Kevin; Bell, Sarah; Gosling, Simon N.; Powrie, William; Hall, Jim W.

    2018-06-01

    Extreme weather causes substantial adverse socio-economic impacts by damaging and disrupting the infrastructure services that underpin modern society. Globally, $2.5tn a year is spent on infrastructure which is typically designed to last decades, over which period projected changes in the climate will modify infrastructure performance. A systems approach has been developed to assess risks across all infrastructure sectors to guide national policy making and adaptation investment. The method analyses diverse evidence of climate risks and adaptation actions, to assess the urgency and extent of adaptation required. Application to the UK shows that despite recent adaptation efforts, risks to infrastructure outweigh opportunities. Flooding is the greatest risk to all infrastructure sectors: even if the Paris Agreement to limit global warming to 2°C is achieved, the number of users reliant on electricity infrastructure at risk of flooding would double, while a 4°C rise could triple UK flood damage. Other risks are significant, for example 5% and 20% of river catchments would be unable to meet water demand with 2°C and 4°C global warming respectively. Increased interdependence between infrastructure systems, especially from energy and information and communication technology (ICT), are amplifying risks, but adaptation action is limited by lack of clear responsibilities. A programme to build national capability is urgently required to improve infrastructure risk assessment. This article is part of the theme issue `Advances in risk assessment for climate change adaptation policy'.

  4. A systems framework for national assessment of climate risks to infrastructure

    Science.gov (United States)

    Thompson, David; Johns, Daniel; Darch, Geoff; Paulson, Kevin

    2018-01-01

    Extreme weather causes substantial adverse socio-economic impacts by damaging and disrupting the infrastructure services that underpin modern society. Globally, $2.5tn a year is spent on infrastructure which is typically designed to last decades, over which period projected changes in the climate will modify infrastructure performance. A systems approach has been developed to assess risks across all infrastructure sectors to guide national policy making and adaptation investment. The method analyses diverse evidence of climate risks and adaptation actions, to assess the urgency and extent of adaptation required. Application to the UK shows that despite recent adaptation efforts, risks to infrastructure outweigh opportunities. Flooding is the greatest risk to all infrastructure sectors: even if the Paris Agreement to limit global warming to 2°C is achieved, the number of users reliant on electricity infrastructure at risk of flooding would double, while a 4°C rise could triple UK flood damage. Other risks are significant, for example 5% and 20% of river catchments would be unable to meet water demand with 2°C and 4°C global warming respectively. Increased interdependence between infrastructure systems, especially from energy and information and communication technology (ICT), are amplifying risks, but adaptation action is limited by lack of clear responsibilities. A programme to build national capability is urgently required to improve infrastructure risk assessment. This article is part of the theme issue ‘Advances in risk assessment for climate change adaptation policy’. PMID:29712793

  5. Risk assessment of flavouring substances used in foods

    DEFF Research Database (Denmark)

    Norby, Karin; Beltoft, Vibe Meister; Greve, Krestine

    2006-01-01

    not to present a safety concern, have been specified. In the project a very comprehensive database (the FLAVIS database) has been developed for the evaluation. It compiles information on the about 2800 flavouring substances used in Europe: specifications, structural class, food categories used in, intake data......The aim of the present project, the FLAVIS project, is to perform risk assessment of chemically defined flavouring substances. The evaluations are then presented to the European Food Safety Authority (EFSA) for final adoption in its Scientific Panel on food additives, flavourings, processing aids...... and materials in contact with food. The regulatory background for the work is found in the European Parliament and Council Regulation No. 2232/96 laying down a procedure for the establishment of a list of flavouring substances the use of which will be authorised to the exclusion of all others in the EU...

  6. Probabilistic assessment of roadway departure risk in a curve

    Science.gov (United States)

    Rey, G.; Clair, D.; Fogli, M.; Bernardin, F.

    2011-10-01

    Roadway departure while cornering constitutes a major part of car accidents and casualties in France. Even though drastic policy about overspeeding contributes to reduce accidents, there obviously exist other factors. This article presents the construction of a probabilistic strategy for the roadway departure risk assessment. A specific vehicle dynamic model is developed in which some parameters are modelled by random variables. These parameters are deduced from a sensitivity analysis to ensure an efficient representation of the inherent uncertainties of the system. Then, structural reliability methods are employed to assess the roadway departure risk in function of the initial conditions measured at the entrance of the curve. This study is conducted within the French national road safety project SARI that aims to implement a warning systems alerting the driver in case of dangerous situation.

  7. Patient caries risk assessment

    DEFF Research Database (Denmark)

    Twetman, Svante; Fontana, Margherita

    2009-01-01

    Risk assessment is an essential component in the decision-making process for the correct prevention and management of dental caries. Multiple risk factors and indicators have been proposed as targets in the assessment of risk of future disease, varying sometimes based on the age group at which...... they are targeted. Multiple reviews and systematic reviews are available in the literature on this topic. This chapter focusses primarily on results of reviews based on longitudinal studies required to establish the accuracy of caries risk assessment. These findings demonstrate that there is a strong body...... of evidence to support that caries experience is still, unfortunately, the single best predictor for future caries development. In young children, prediction models which include a variety of risk factors seem to increase the accuracy of the prediction, while the usefulness of additional risk factors...

  8. Risk identification for PPP waste-to-energy incineration projects in China

    International Nuclear Information System (INIS)

    Song, Jinbo; Song, Danrong; Zhang, Xueqing; Sun, Yan

    2013-01-01

    Municipal solid waste (MSW) is regarded as a renewable energy source. In China, the sharp increase of MSW has precipitated the rapid growth of waste-to-energy (WTE) incineration plants. Private capital has been getting into the WTE incineration industry through the public–private partnership (PPP) arrangement. Due to the large construction cost and the long concession period commonly associated with this arrangement, a number of failures have emerged in PPP WTE incineration projects. The aim of this paper is to investigate the key risks of PPP WTE incineration projects in China and study the strategies for managing these risks by drawing experience and learning lessons from these projects. First, we analyzed the MSW management practices, relevant legislations and policies, and the development of PPP WTE incineration projects in China. Second, we identified ten key risks through interviews, surveys and visits to some selected projects, and provided detailed analysis of these risks. Lastly, we developed response strategies for these risks from the perspectives of both public and private sectors. - Highlights: • We analyze MSW management practices, relevant legislations and policies in China. • Through case study on PPP WTE incineration projects, ten key risks are identified. • Response strategies for key risks are developed

  9. Building better environmental risk assessments

    Directory of Open Access Journals (Sweden)

    Raymond eLayton

    2015-08-01

    Full Text Available Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERA for genetically modified (GM crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems – examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data, and adapting advances in risk analysis from other relevant disciplines.

  10. Building Better Environmental Risk Assessments

    Science.gov (United States)

    Layton, Raymond; Smith, Joe; Macdonald, Phil; Letchumanan, Ramatha; Keese, Paul; Lema, Martin

    2015-01-01

    Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision-making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERAs) for genetically modified (GM) crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems – examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data), and adapting advances in risk analysis from other relevant disciplines. PMID:26301217

  11. Building Better Environmental Risk Assessments.

    Science.gov (United States)

    Layton, Raymond; Smith, Joe; Macdonald, Phil; Letchumanan, Ramatha; Keese, Paul; Lema, Martin

    2015-01-01

    Risk assessment is a reasoned, structured approach to address uncertainty based on scientific and technical evidence. It forms the foundation for regulatory decision-making, which is bound by legislative and policy requirements, as well as the need for making timely decisions using available resources. In order to be most useful, environmental risk assessments (ERAs) for genetically modified (GM) crops should provide consistent, reliable, and transparent results across all types of GM crops, traits, and environments. The assessments must also separate essential information from scientific or agronomic data of marginal relevance or value for evaluating risk and complete the assessment in a timely fashion. Challenges in conducting ERAs differ across regulatory systems - examples are presented from Canada, Malaysia, and Argentina. One challenge faced across the globe is the conduct of risk assessments with limited resources. This challenge can be overcome by clarifying risk concepts, placing greater emphasis on data critical to assess environmental risk (for example, phenotypic and plant performance data rather than molecular data), and adapting advances in risk analysis from other relevant disciplines.

  12. Risk Assessment Stability: A Revalidation Study of the Arizona Risk/Needs Assessment Instrument

    Science.gov (United States)

    Schwalbe, Craig S.

    2009-01-01

    The actuarial method is the gold standard for risk assessment in child welfare, juvenile justice, and criminal justice. It produces risk classifications that are highly predictive and that may be robust to sampling error. This article reports a revalidation study of the Arizona Risk/Needs Assessment instrument, an actuarial instrument for juvenile…

  13. Crop modelling for integrated assessment of risk to food production from climate change

    Czech Academy of Sciences Publication Activity Database

    Ewert, F.; Rötter, R. P.; Bindi, M.; Weber, H.; Trnka, Miroslav; Kersebaum, K. C.; Olesen, J. E.; van Ittersum, M. K.; Janssen, S.; Rivingtom, M.; Semenov, M. A.; Wallach, D.; Porter, J. R.; Stewart, D.; Vegahen, J.; Gaiser, T.; Palouso, T.; Tao, F.; Nendel, C.; Roggero, P. P.; Bartošová, Lenka; Asseng, S.

    2015-01-01

    Roč. 72, oct (2015), s. 287-303 ISSN 1364-8152 R&D Projects: GA MZe QJ1310123; GA MŠk(CZ) EE2.3.20.0248 Institutional support: RVO:67179843 Keywords : uncertainty * scaling * integrated assessment * risk assessment * adaptation * crop models Subject RIV: DG - Athmosphere Sciences, Meteorology Impact factor: 4.207, year: 2015

  14. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site at Grand Junction, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This risk assessment evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site.

  15. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site at Grand Junction, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-09-01

    This risk assessment evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site

  16. The MERINOVA project: MEteorological RIsks as drivers of environmental inNOvation in Agro-ecosystem management

    Science.gov (United States)

    Gobin, Anne; Van de vijver, Hans; Zamani, Sepideh; Curnel, Yannick; Planchon, Viviane; Verspecht, Ann; Van Huylenbroeck, Guido

    2014-05-01

    Devastating weather-related events have captured the interest of the general public in Belgium. Extreme weather events such as droughts, heat waves and rain storms are projected to increase both in frequency and magnitude with climate change. Since more than half of the Belgian territory is managed by the agricultural sector, extreme events may have significant impacts on agro-ecosystem services and pose severe limitations to sustainable agricultural land management. The research hypothesis of the MERINOVA project is that meteorological risks act as drivers of environmental innovation in agro-ecosystem management. The major objectives are to characterise extreme meteorological events, assess the impact on Belgian agro-ecosystems, characterise their vulnerability and resilience to these events, and explore innovative adaptation options to agricultural risk management. The project comprises of five major parts that reflect the chain of risks: the hazard, its impact on different agro-ecosystems, vulnerability, risk management and risk communication. Impacts developed from physically based models not only provide information on the state of the damage at any given time, but also assist in understanding the links between different factors causing damage and determining bio-physical vulnerability. Socio-economic impacts enlarge the basis for vulnerability mapping, risk management and adaptation options. The perspective of rising risk-exposure is exacerbated further by more limits to aid received for agricultural damage and an overall reduction of direct income support to farmers. The main findings of each of these project building blocks will be communicated. MERINOVA provides for a robust and flexible framework by demonstrating its performance across Belgian agro-ecosystems, and by ensuring its relevance to policy makers and practitioners. A strong expert and end-user network is established to help disseminating and exploiting project results to meet user needs. The

  17. Fisheries and Oceans Canada climate change risk assessment initiative

    Energy Technology Data Exchange (ETDEWEB)

    Dalpe, R. [Fisheries and Oceans, Ottawa, ON (Canada)

    2005-07-01

    This paper provided an overview of an initiative undertaken by the Department of Fisheries and Oceans (DFO) Canada to assess the risks associated with climate change on Canada's waterways and aquatic resources over the next 10 to 20 years. It discussed the risk associated with changes in water temperature and level in increasing the vulnerability of fish stocks and ecosystems. A decrease in water levels is also an issue as it will render current infrastructure ineffective. Storm surges can also have an impact on coastal community infrastructure. The purpose of the assessment was to provide DFO management with a structured understanding of the major climate change factors that pose risks to DFO's operations and to establish priorities in identifying appropriate risk mitigation responses. The presentation discussed the different stages of the initiative (planning, identification and evaluation of risk, validation, and reporting), its' challenges and benefits, as well as lessons learned from this exercises. Lessons learned from the project are as follows: get senior level buy-in from the outset; engage the right people; make it easy for others to be engaged; validate results and risk management response; be ready for surprises; and build in some flexibility to the process. figs.

  18. Risk assessment of flood disaster and forewarning model at different spatial-temporal scales

    Science.gov (United States)

    Zhao, Jun; Jin, Juliang; Xu, Jinchao; Guo, Qizhong; Hang, Qingfeng; Chen, Yaqian

    2018-05-01

    Aiming at reducing losses from flood disaster, risk assessment of flood disaster and forewarning model is studied. The model is built upon risk indices in flood disaster system, proceeding from the whole structure and its parts at different spatial-temporal scales. In this study, on the one hand, it mainly establishes the long-term forewarning model for the surface area with three levels of prediction, evaluation, and forewarning. The method of structure-adaptive back-propagation neural network on peak identification is used to simulate indices in prediction sub-model. Set pair analysis is employed to calculate the connection degrees of a single index, comprehensive index, and systematic risk through the multivariate connection number, and the comprehensive assessment is made by assessment matrixes in evaluation sub-model. The comparison judging method is adopted to divide warning degree of flood disaster on risk assessment comprehensive index with forewarning standards in forewarning sub-model and then the long-term local conditions for proposing planning schemes. On the other hand, it mainly sets up the real-time forewarning model for the spot, which introduces the real-time correction technique of Kalman filter based on hydrological model with forewarning index, and then the real-time local conditions for presenting an emergency plan. This study takes Tunxi area, Huangshan City of China, as an example. After risk assessment and forewarning model establishment and application for flood disaster at different spatial-temporal scales between the actual and simulated data from 1989 to 2008, forewarning results show that the development trend for flood disaster risk remains a decline on the whole from 2009 to 2013, despite the rise in 2011. At the macroscopic level, project and non-project measures are advanced, while at the microcosmic level, the time, place, and method are listed. It suggests that the proposed model is feasible with theory and application, thus

  19. Tool-based Risk Assessment of Cloud Infrastructures as Socio-Technical Systems

    DEFF Research Database (Denmark)

    Nidd, Michael; Ivanova, Marieta Georgieva; Probst, Christian W.

    2015-01-01

    Assessing risk in cloud infrastructures is difficult. Typical cloud infrastructures contain potentially thousands of nodes that are highly interconnected and dynamic. Another important component is the set of human actors who get access to data and computing infrastructure. The cloud infrastructure...... exercise for cloud infrastructures using the socio-technical model developed in the TRESPASS project; after showing how to model typical components of a cloud infrastructure, we show how attacks are identified on this model and discuss their connection to risk assessment. The technical part of the model...... is extracted automatically from the configuration of the cloud infrastructure, which is especially important for systems so dynamic and complex....

  20. Ocean acidification risk assessment for Alaska's fishery sector

    Science.gov (United States)

    Mathis, J. T.; Cooley, S. R.; Lucey, N.; Colt, S.; Ekstrom, J.; Hurst, T.; Hauri, C.; Evans, W.; Cross, J. N.; Feely, R. A.

    2015-08-01

    The highly productive fisheries of Alaska are located in seas projected to experience strong global change, including rapid transitions in temperature and ocean acidification-driven changes in pH and other chemical parameters. Many of the marine organisms that are most intensely affected by ocean acidification (OA) contribute substantially to the state's commercial fisheries and traditional subsistence way of life. Prior studies of OA's potential impacts on human communities have focused only on possible direct economic losses from specific scenarios of human dependence on commercial harvests and damages to marine species. However, other economic and social impacts, such as changes in food security or livelihoods, are also likely to result from climate change. This study evaluates patterns of dependence on marine resources within Alaska that could be negatively impacted by OA and current community characteristics to assess the potential risk to the fishery sector from OA. Here, we used a risk assessment framework based on one developed by the Intergovernmental Panel on Climate Change to analyze earth-system global ocean model hindcasts and projections of ocean chemistry, fisheries harvest data, and demographic information. The fisheries examined were: shellfish, salmon and other finfish. The final index incorporates all of these data to compare overall risk among Alaska's federally designated census areas. The analysis showed that regions in southeast and southwest Alaska that are highly reliant on fishery harvests and have relatively lower incomes and employment alternatives likely face the highest risk from OA. Although this study is an intermediate step toward our full understanding, the results presented here show that OA merits consideration in policy planning, as it may represent another challenge to Alaskan communities, some of which are already under acute socio-economic strains.

  1. The Impact of Tax Shocks and Oil Price Volatility on Risk - A Study of North Sea Oilfield Projects

    OpenAIRE

    Kretzschmar, Gavin Lee; Moles, Peter

    2006-01-01

    We examine the impact of market volatility and increased fiscal take on risk in strategic natural resource projects. An increase in 2006 UK oilfield taxation is used as a natural experiment for assessing the impact of a fiscal increase on oilfield projects comprising 73% of UK reserves. Stochastic cash flow at risk models combine market volatility and tax-take at the oilfield level to extend earlier North Sea studies. We demonstrate that a 10% Secondary tax increase in a composite UKCS fiscal...

  2. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  3. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This report evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells to determine the potential for immediate human health and environmental impacts. This risk assessment evaluates the most contaminated groundwater that flows beneath the processing site towards the Gunnison River. The monitor wells that have consistently shown the highest concentration of most contaminants are used in this risk assessment. This risk assessment will be used in conjunction with additional activities and documents to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium.

  4. Community-Based Diabetes Screening and Risk Assessment in Rural West Virginia

    Directory of Open Access Journals (Sweden)

    Ranjita Misra

    2016-01-01

    Full Text Available This project utilized a cross-sectional study design to assess diabetes risk among 540 individuals from 12 counties using trained extension agents and community organizations in West Virginia. Individuals were screened for diabetes using (1 the validated 7-item diabetes risk assessment survey and (2 hemoglobin A1c tests. Demographic and lifestyle behaviors were also collected. The average age, body mass index, and A1c were 51.2±16.4, 31.1±7.5, and 5.8±0.74, respectively. The majority were females, Non-Hispanic Whites with no prior diagnosis of diabetes. Screenings showed that 61.8% of participants were at high risk for diabetes. Family history of diabetes (siblings or parents, overweight or obese status, sedentary lifestyle, and older age were commonly prevalent risk factors. Higher risk scores computed from the 7-item questions correlated positively with higher A1c (r=0.221, P<0.001. In multivariate logistic regression analyses, higher diabetes risk was predicted by obesity, older age, family history of hypertension, and gestational diabetes. Females were 4 times at higher risk than males. The findings indicated that community-based screenings were an effective way to assess diabetes risk in rural West Virginia. Linking diabetes screenings with referrals to lifestyle programs for high risk individuals can help reduce the burden of diabetes in the state.

  5. Risk profile modification of energy projects

    International Nuclear Information System (INIS)

    Larson, B.O.

    1992-01-01

    The commodity futures and swaps markets are thought by some to be the invention of speculators, the bane of the oil business, or possibly something confined to finance departments of major corporations. In actuality, they should be considered more as insurance and can be utilized at the project level to modify the risk profile of a property. In this context, an increased familiarity with them can be useful for an engineer. This paper reports that either futures or swaps can be used to guarantee or modify product prices, an accomplishment very difficult or impossible to duplicate through other means, particularly with such integrity. Participation in futures or swaps does not necessarily maximize cashflow or present worth, it can either guarantee the price, put a minimum price in place or offer a combination of the above. A project or company can be protected for several years from downside price risk using swaps. Not being subject to market price swings substantially reduces the risk of the venture. This can be particularly important if lower product prices would cause unacceptable cashflows or net incomes

  6. Sustainability Risk Evaluation for Large-Scale Hydropower Projects with Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Weiyao Tang

    2018-01-01

    Full Text Available As large-scale hydropower projects are influenced by many factors, risk evaluations are complex. This paper considers a hydropower project as a complex system from the perspective of sustainability risk, and divides it into three subsystems: the natural environment subsystem, the eco-environment subsystem and the socioeconomic subsystem. Risk-related factors and quantitative dimensions of each subsystem are comprehensively analyzed considering uncertainty of some quantitative dimensions solved by hybrid uncertainty methods, including fuzzy (e.g., the national health degree, the national happiness degree, the protection of cultural heritage, random (e.g., underground water levels, river width, and fuzzy random uncertainty (e.g., runoff volumes, precipitation. By calculating the sustainability risk-related degree in each of the risk-related factors, a sustainable risk-evaluation model is built. Based on the calculation results, the critical sustainability risk-related factors are identified and targeted to reduce the losses caused by sustainability risk factors of the hydropower project. A case study at the under-construction Baihetan hydropower station is presented to demonstrate the viability of the risk-evaluation model and to provide a reference for the sustainable risk evaluation of other large-scale hydropower projects.

  7. Health risk assessment based on injection of upgraded biogas in natural gas grid

    International Nuclear Information System (INIS)

    Leroux, C.; Modelon, H.; Rousselle, C.; Zdanevitch, I.; Evanno, S.

    2010-01-01

    This document presents the opinion of the French Agency for Environmental and Occupational Health Safety (AFSSET). Results are based on a collective expertise conducted to assess health risks associated with the injection of biogas in the natural gas grid. The complete assessment is published and available on the web site of the Agency; only the major results are presented in this document. Following recommendations issued by AFSSET in 2008, a new study has been initiated to collect and analyze data on the composition of biogas from sewage sludge. The French National Institute for Industrial Environment and Risks (INERIS) is in charge of this project. The data will be used to assess the accidental risks (resulting from the upgrading of biogas, transport by pipeline and utilization for energy purposes) and health risks for users (resulting from the injection in the natural gas grid). (authors)

  8. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  9. Effective Project Risk management in Micro Companies : Case study for Persona Optima Iceland ehf.

    OpenAIRE

    Bražinskaitė, Justina

    2011-01-01

    This study is meant to be a guide for micro companies regarding effective project risk management. The main purpose of this thesis is to introduce project risk management and build a user-friendly managerial model toward effective project risk management in micro companies. The research is based on a case company Persona Optima Iceland ehf. analysis. The study investigates risk management, uncertainties and risks in projects, project risk management, its models and particularities in orde...

  10. Sexual HIV Risk Among Male Parolees and Their Female Partners: The Relate Project.

    Science.gov (United States)

    Comfort, Megan; Reznick, Olga Grinstead; Dilworth, Samantha E; Binson, Diane; Darbes, Lynae A; Neilands, Torsten B

    The massively disproportionate impact of America's prison boom on communities of color has raised questions about how incarceration may affect health disparities, including disparities in HIV. Primary partners are an important source of influence on sexual health. In this paper, we investigate sexual HIV risk among male-female couples following a man's release from prison. We draw upon data from the Relate Project, a novel cross-sectional survey of recently released men and their female partners in Oakland and San Francisco, California (N=344). Inferential analyses use the actor-partner model to explore actor and partner effects on sexual HIV risk outcomes. Dyadic analyses of sexual HIV risk among male parolees and their female partners paint a complex portrait of couples affected by incarceration and of partners' influences on each other. Findings indicate that demographic factors such as education level and employment status, individual psycho-social factors such as perception of risk, and relationship factors such as commitment and power affect sexual HIV risk outcomes. The Relate Project provides a novel dataset for the dyadic analysis of sexual risk among male parolees and their female partners, and results highlight the importance of focusing on the couple as a unit when assessing HIV risk and protective behaviors. Results also indicate potentially fruitful avenues for population-specific interventions that may help to reduce sexual health disparities among couples affected by incarceration.

  11. Design and implementation of a risk assessment module in a spatial decision support system

    Science.gov (United States)

    Zhang, Kaixi; van Westen, Cees; Bakker, Wim

    2014-05-01

    The spatial decision support system named 'Changes SDSS' is currently under development. The goal of this system is to analyze changing hydro-meteorological hazards and the effect of risk reduction alternatives to support decision makers in choosing the best alternatives. The risk assessment module within the system is to assess the current risk, analyze the risk after implementations of risk reduction alternatives, and analyze the risk in different future years when considering scenarios such as climate change, land use change and population growth. The objective of this work is to present the detailed design and implementation plan of the risk assessment module. The main challenges faced consist of how to shift the risk assessment from traditional desktop software to an open source web-based platform, the availability of input data and the inclusion of uncertainties in the risk analysis. The risk assessment module is developed using Ext JS library for the implementation of user interface on the client side, using Python for scripting, as well as PostGIS spatial functions for complex computations on the server side. The comprehensive consideration of the underlying uncertainties in input data can lead to a better quantification of risk assessment and a more reliable Changes SDSS, since the outputs of risk assessment module are the basis for decision making module within the system. The implementation of this module will contribute to the development of open source web-based modules for multi-hazard risk assessment in the future. This work is part of the "CHANGES SDSS" project, funded by the European Community's 7th Framework Program.

  12. Risk assessment: 'A consumer's perspective'

    International Nuclear Information System (INIS)

    Waterhouse, Rachel

    1992-01-01

    The paper assesses the concept of risk, risk assessment and tolerability of risk from consumer point of view. Review of existing UK and EC directives on certain products and appliances is also covered

  13. Risk assessment: 'A consumer's perspective'

    Energy Technology Data Exchange (ETDEWEB)

    Waterhouse, Rachel [Consumer' s Association, Health and Safety Commission (United Kingdom)

    1992-07-01

    The paper assesses the concept of risk, risk assessment and tolerability of risk from consumer point of view. Review of existing UK and EC directives on certain products and appliances is also covered.

  14. Finding the Optimum Scenario in Risk-benefit Assessment: An Example on Vitamin D

    DEFF Research Database (Denmark)

    Berjia, Firew Lemma; Hoekstra, J.; Verhagen, H.

    2014-01-01

    an optimum scenario that provides maximum net health gain in health risk-benefit assessment of dietary exposure as expressed by serum vitamin D level. With regard to the vitamin D assessment, a considerable health gain is observed due to the reduction of risk of other cause mortality, fall and hip fractures......Background: In risk-benefit assessment of food and nutrients, several studies so far have focused on comparison of two scenarios to weigh the health effect against each other. One obvious next step is finding the optimum scenario that provides maximum net health gains. Aim: This paper aims to show...... that provides maximum net health gains. As a common health metric, Disability Adjusted Life Years (DALY) has been used to project the net health effect by using the QALIBRA (Quality of Life for Benefit Risk Assessment) software. Results: The method used in the vitamin D example shows that it is feasible to find...

  15. Development of fire risk assessment method caused by earthquake

    International Nuclear Information System (INIS)

    Mitomo, Nobuo; Matsukura, Hiroshi; Matsuoka, Takeshi; Suzuki, Kazutaka

    2000-01-01

    The purpose of this research is to establish the assessment method of the risk of the multiple fires caused by earthquake, in the framework of PSA. In order to establish this method, we have settled four tasks and started a five years research project in 1999 for five years. These results will be useful for not only nuclear power plants but also chemical plants, traffic systems etc. (author)

  16. Tools and Methods for Risk Management in Multi-Site Engineering Projects

    Science.gov (United States)

    Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman

    In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.

  17. Hydrologic Extremes and Risk Assessment under Non-stationarity

    Science.gov (United States)

    Mondal, A.

    2015-12-01

    In the context of hydrologic designs, robust assessment and communication of risk is crucial to ascertain a sustainable water future. Traditional methods for defining return period, risk or reliability assumes a stationary regime which may no longer be valid because of natural or man-made changes. Reformulations are suggested in recent literature to account for non-stationarity in the definition of hydrologic risk, as time evolves. This study presents a comparative analysis of design levels under non-stationarity based on time varying annual exceedance probabilities, waiting time of a hazardous event, number of hazardous events and probability of failure. A case study application is shown for peak streamflow in the flood-prone delta area of the Krishna River in India where an increasing trend in annual maximum flows are observed owing to persistent silting. Considerable disagreement is found between the design magnitudes of flood obtained by the different definitions of hydrologic risk. Such risk is also found to be highly sensitive to the assumed design life period and projections of trend in that period or beyond. Additionally, some critical points on the assumption of a deterministic non-stationary model for an observed natural process are also discussed. The findings highlight the necessity for a unifying framework for assessment and communication of hydrologic risk under transient hydro-climatic conditions. The concepts can also be extended to other applications such as regional hydrologic frequency analysis or development of precipitation intensity-duration-frequency relationships for infrastructure design.

  18. Using risk assessment in periodontics.

    Science.gov (United States)

    Woodman, Alan J

    2014-08-01

    Risk assessment has become a regular feature in both dental practice and society as a whole, and principles used to assess risk in society are similar to those used in a clinical setting. Although the concept of risk assessment as a prognostic indicator for periodontal disease incidence and activity is well established in the management of periodontitis, the use of risk assessment to manage the practical treatment of periodontitis and its sequelae appears to have less foundation. A simple system of initial risk assessment - building on the use of the Basic Periodontal Examination (BPE), clinical, medical and social factors - is described, linked to protocols for delivering care suited to general dental practice and stressing the role of long-term supportive care. The risks of not treating the patient are considered, together with the possible causes of failure, and the problems of successful treatment are illustrated by the practical management of post-treatment recession.

  19. Project risk definition and measurement in a not-for-profit setting.

    Science.gov (United States)

    Gapenski, L C

    1992-11-01

    The health care finance literature on capital investment decisions generally applies conventional market risk concepts without distinguishing between proprietary and not-for-profit forms of organization. Since proprietary firms have shareholder wealth maximization as their primary goal, a project's relevant risk is its contribution to the riskiness of the equity investors' well diversified stock portfolios, or its market risk. However, not-for-profit organizations do not have shareholder wealth maximization as their primary goal, and thus market risk concepts are not applicable. Rather, the relevant risk in a not-for-profit setting is a project's corporate risk; that is, the project's contribution to the riskiness of the organization. The difference in risk definition and measurement between proprietary and not-for-profit firms has two implications for managerial decisions: (1) in making capital investment decisions, a manager must define and measure a project's riskiness on the basis of the firm's organizational form; and (2) although diversification for the sole purpose of risk reduction is not a valid rationale for proprietary firms because stockholders can achieve the same result at less cost, risk-reducing diversification does make sense for not-for-profit firms.

  20. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  1. The Contribution of Project Environmental Assessment to Assessing and Managing Cumulative Effects: Individually and Collectively Insignificant?

    Science.gov (United States)

    Noble, Bram; Liu, Jialang; Hackett, Paul

    2017-04-01

    This paper explores the opportunities and constraints to project-based environmental assessment as a means to support the assessment and management of cumulative environmental effects. A case study of the hydroelectric sector is used to determine whether sufficient information is available over time through project-by-project assessments to support an adequate understanding of cumulative change. Results show inconsistency from one project to the next in terms of the components and indicators assessed, limited transfer of baseline information between project assessments over time, and the same issues and concerns being raised by review panels-even though the projects reviewed are operating in the same watershed and operated by the same proponent. Project environmental assessments must be managed, and coordinated, as part of a larger system of impact assessment, if project-by-project assessments are to provide a meaningful forum for learning and understanding cumulative change. The paper concludes with recommendations for improved project-based assessment practice in support of cumulative effects assessment and management.

  2. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  3. Baseline risk assessment of ground water contamination at the Monument Valley Uranium Mill Tailings Site, Cane Valley, Arizona. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This baseline risk assessment evaluates potential impact to public health or the environment from ground water contamination at the former uranium mill processing site in Cane Valley near Monument Valley, Arizona. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project has relocated and stabilized this site`s tailings and other contaminated material in a disposal cell at Mexican Hat, Utah. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project that evaluates potential health and environmental risks. It will help determine the approach required to address contaminated ground water at the site.

  4. Baseline risk assessment of ground water contamination at the Monument Valley Uranium Mill Tailings Site, Cane Valley, Arizona. Revision 1

    International Nuclear Information System (INIS)

    1994-08-01

    This baseline risk assessment evaluates potential impact to public health or the environment from ground water contamination at the former uranium mill processing site in Cane Valley near Monument Valley, Arizona. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project has relocated and stabilized this site's tailings and other contaminated material in a disposal cell at Mexican Hat, Utah. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project that evaluates potential health and environmental risks. It will help determine the approach required to address contaminated ground water at the site

  5. Supporting Risk Assessment: Accounting for Indirect Risk to Ecosystem Components.

    Directory of Open Access Journals (Sweden)

    Cathryn Clarke Murray

    Full Text Available The multi-scalar complexity of social-ecological systems makes it challenging to quantify impacts from human activities on ecosystems, inspiring risk-based approaches to assessments of potential effects of human activities on valued ecosystem components. Risk assessments do not commonly include the risk from indirect effects as mediated via habitat and prey. In this case study from British Columbia, Canada, we illustrate how such "indirect risks" can be incorporated into risk assessments for seventeen ecosystem components. We ask whether (i the addition of indirect risk changes the at-risk ranking of the seventeen ecosystem components and if (ii risk scores correlate with trophic prey and habitat linkages in the food web. Even with conservative assumptions about the transfer of impacts or risks from prey species and habitats, the addition of indirect risks in the cumulative risk score changes the ranking of priorities for management. In particular, resident orca, Steller sea lion, and Pacific herring all increase in relative risk, more closely aligning these species with their "at-risk status" designations. Risk assessments are not a replacement for impact assessments, but-by considering the potential for indirect risks as we demonstrate here-they offer a crucial complementary perspective for the management of ecosystems and the organisms within.

  6. Dose related risk and effect assessment model (DREAM) -- A more realistic approach to risk assessment of offshore discharges

    International Nuclear Information System (INIS)

    Johnsen, S.; Furuholt, E.

    1995-01-01

    Risk assessment of discharges from offshore oil and gas production to the marine environment features determination of potential environmental concentration (PEC) levels and no observed effect concentration (NOEC) levels. The PEC values are normally based on dilution of chemical components in the actual discharge source in the recipient, while the NOEC values are determined by applying a safety factor to acute toxic effects from laboratory tests. The DREAM concept focuses on realistic exposure doses as function of contact time and dilution, rather than fixed exposure concentrations of chemicals in long time exposure regimes. In its present state, the DREAM model is based on a number of assumptions with respect to the link between real life exposure doses and effects observed in laboratory tests. A research project has recently been initiated to develop the concept further, with special focus on chronic effects of different chemical compounds on the marine ecosystem. One of the questions that will be addressed is the link between exposure time, dose, concentration and effect. Validation of the safety factors applied for transforming acute toxic data into NOEC values will also be included. The DREAM model has been used by Statoil for risk assessment of discharges from new and existing offshore oil and gas production fields, and has been found to give a much more realistic results than conventional risk assessment tools. The presentation outlines the background for the DREAM approach, describes the model in its present state, discusses further developments and applications, and shows a number of examples on the performance of DREAM

  7. 24 CFR 35.315 - Risk assessment.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Risk assessment. 35.315 Section 35... Provided by a Federal Agency Other Than HUD § 35.315 Risk assessment. Each owner shall complete a risk assessment in accordance with 40 CFR 745.227(d). Each risk assessment shall be completed in accordance with...

  8. Shell’s use of science in de-risking projects

    CSIR Research Space (South Africa)

    Rossouw, N

    2017-10-01

    Full Text Available This presentation discusses Shell’s use of science in de-risking projects. The presentation includes examples of applying science in the De-Risking process, supporting scientific research and De-Risking the Karoo Basin....

  9. Study On Risk Handling Strategy Of Road Contruction Projects In Jayapura City

    Directory of Open Access Journals (Sweden)

    Irianto

    2017-08-01

    Full Text Available Project risk is an event or an uncertain condition which if it appears will have a threat on the project object. Many contractors still do not understand the threats that occur in the project they still assume that risks are always harmful. Based on data from the Papua Public Works procurement service that the implementation of road improvement projects always faces problems. This research is an explorative and descriptive study which explores the risks threats that occur in the project from the contractors perspective in Jayapura Papua Province Indonesia. The object of this research is the company contractor involved in the implementation of road improvement project in Jayapura whereas the respondent is the project manager and the field supervisor involved in the implementation of road improvement project The analysis result shows that the overall level of risk is in very low category and the biggest risks affecting contractors in sequence are 1 material delays from suppliers 2 material inventories 3 design difficulties 4 incorrectly shipped material volumes 5 changes to specifications by the owner 6 difficulty in obtaining materials and equipment 7 material price increases 8 over quality 9 damage to machine tools 10 weakening the bearing capacity of subgrade soil. While the response to risks threats that occur in road improvement projects is to reduce and avoid.

  10. Improved Methods for Fire Risk Assessment in Low-Income and Informal Settlements

    Directory of Open Access Journals (Sweden)

    John Twigg

    2017-02-01

    Full Text Available Fires cause over 300,000 deaths annually worldwide and leave millions more with permanent injuries: some 95% of these deaths are in low- and middle-income countries. Burn injury risk is strongly associated with low-income and informal (or slum settlements, which are growing rapidly in an urbanising world. Fire policy and mitigation strategies in poorer countries are constrained by inadequate data on incidence, impacts, and causes, which is mainly due to a lack of capacity and resources for data collection, analysis, and modelling. As a first step towards overcoming such challenges, this project reviewed the literature on the subject to assess the potential of a range of methods and tools for identifying, assessing, and addressing fire risk in low-income and informal settlements; the process was supported by an expert workshop at University College London in May 2016. We suggest that community-based risk and vulnerability assessment methods, which are widely used in disaster risk reduction, could be adapted to urban fire risk assessment, and could be enhanced by advances in crowdsourcing and citizen science for geospatial data creation and collection. To assist urban planners, emergency managers, and community organisations who are working in resource-constrained settings to identify and assess relevant fire risk factors, we also suggest an improved analytical framework based on the Haddon Matrix.

  11. Improved Methods for Fire Risk Assessment in Low-Income and Informal Settlements.

    Science.gov (United States)

    Twigg, John; Christie, Nicola; Haworth, James; Osuteye, Emmanuel; Skarlatidou, Artemis

    2017-02-01

    Fires cause over 300,000 deaths annually worldwide and leave millions more with permanent injuries: some 95% of these deaths are in low- and middle-income countries. Burn injury risk is strongly associated with low-income and informal (or slum) settlements, which are growing rapidly in an urbanising world. Fire policy and mitigation strategies in poorer countries are constrained by inadequate data on incidence, impacts, and causes, which is mainly due to a lack of capacity and resources for data collection, analysis, and modelling. As a first step towards overcoming such challenges, this project reviewed the literature on the subject to assess the potential of a range of methods and tools for identifying, assessing, and addressing fire risk in low-income and informal settlements; the process was supported by an expert workshop at University College London in May 2016. We suggest that community-based risk and vulnerability assessment methods, which are widely used in disaster risk reduction, could be adapted to urban fire risk assessment, and could be enhanced by advances in crowdsourcing and citizen science for geospatial data creation and collection. To assist urban planners, emergency managers, and community organisations who are working in resource-constrained settings to identify and assess relevant fire risk factors, we also suggest an improved analytical framework based on the Haddon Matrix.

  12. Assessing uncertainty and risk in exploited marine populations

    International Nuclear Information System (INIS)

    Fogarty, M.J.; Mayo, R.K.; O'Brien, L.; Serchuk, F.M.; Rosenberg, A.A.

    1996-01-01

    The assessment and management of exploited fish and invertebrate populations is subject to several types of uncertainty. This uncertainty translates into risk to the population in the development and implementation of fishery management advice. Here, we define risk as the probability that exploitation rates will exceed a threshold level where long term sustainability of the stock is threatened. We distinguish among several sources of error or uncertainty due to (a) stochasticity in demographic rates and processes, particularly in survival rates during the early fife stages; (b) measurement error resulting from sampling variation in the determination of population parameters or in model estimation; and (c) the lack of complete information on population and ecosystem dynamics. The first represents a form of aleatory uncertainty while the latter two factors represent forms of epistemic uncertainty. To illustrate these points, we evaluate the recent status of the Georges Bank cod stock in a risk assessment framework. Short term stochastic projections are made accounting for uncertainty in population size and for random variability in the number of young surviving to enter the fishery. We show that recent declines in this cod stock can be attributed to exploitation rates that have substantially exceeded sustainable levels

  13. Exploring the uncertainties in cancer risk assessment using the integrated probabilistic risk assessment (IPRA) approach.

    Science.gov (United States)

    Slob, Wout; Bakker, Martine I; Biesebeek, Jan Dirk Te; Bokkers, Bas G H

    2014-08-01

    Current methods for cancer risk assessment result in single values, without any quantitative information on the uncertainties in these values. Therefore, single risk values could easily be overinterpreted. In this study, we discuss a full probabilistic cancer risk assessment approach in which all the generally recognized uncertainties in both exposure and hazard assessment are quantitatively characterized and probabilistically evaluated, resulting in a confidence interval for the final risk estimate. The methodology is applied to three example chemicals (aflatoxin, N-nitrosodimethylamine, and methyleugenol). These examples illustrate that the uncertainty in a cancer risk estimate may be huge, making single value estimates of cancer risk meaningless. Further, a risk based on linear extrapolation tends to be lower than the upper 95% confidence limit of a probabilistic risk estimate, and in that sense it is not conservative. Our conceptual analysis showed that there are two possible basic approaches for cancer risk assessment, depending on the interpretation of the dose-incidence data measured in animals. However, it remains unclear which of the two interpretations is the more adequate one, adding an additional uncertainty to the already huge confidence intervals for cancer risk estimates. © 2014 Society for Risk Analysis.

  14. Supporting Risk Assessment: Accounting for Indirect Risk to Ecosystem Components

    Science.gov (United States)

    Mach, Megan E.; Martone, Rebecca G.; Singh, Gerald G.; O, Miriam; Chan, Kai M. A.

    2016-01-01

    The multi-scalar complexity of social-ecological systems makes it challenging to quantify impacts from human activities on ecosystems, inspiring risk-based approaches to assessments of potential effects of human activities on valued ecosystem components. Risk assessments do not commonly include the risk from indirect effects as mediated via habitat and prey. In this case study from British Columbia, Canada, we illustrate how such “indirect risks” can be incorporated into risk assessments for seventeen ecosystem components. We ask whether (i) the addition of indirect risk changes the at-risk ranking of the seventeen ecosystem components and if (ii) risk scores correlate with trophic prey and habitat linkages in the food web. Even with conservative assumptions about the transfer of impacts or risks from prey species and habitats, the addition of indirect risks in the cumulative risk score changes the ranking of priorities for management. In particular, resident orca, Steller sea lion, and Pacific herring all increase in relative risk, more closely aligning these species with their “at-risk status” designations. Risk assessments are not a replacement for impact assessments, but—by considering the potential for indirect risks as we demonstrate here—they offer a crucial complementary perspective for the management of ecosystems and the organisms within. PMID:27632287

  15. Avalanche risk assessment in Russia

    Science.gov (United States)

    Komarov, Anton; Seliverstov, Yury; Sokratov, Sergey; Glazovskaya, Tatiana; Turchaniniva, Alla

    2017-04-01

    The avalanche prone area covers about 3 million square kilometers or 18% of total area of Russia and pose a significant problem in most mountain regions of the country. The constant growth of economic activity, especially in the North Caucasus region and therefore the increased avalanche hazard lead to the demand of the large-scale avalanche risk assessment methods development. Such methods are needed for the determination of appropriate avalanche protection measures as well as for economic assessments during all stages of spatial planning of the territory. The requirement of natural hazard risk assessments is determined by the Federal Law of Russian Federation. However, Russian Guidelines (SP 11-103-97; SP 47.13330.2012) are not clearly presented concerning avalanche risk assessment calculations. A great size of Russia territory, vast diversity of natural conditions and large variations in type and level of economic development of different regions cause significant variations in avalanche risk values. At the first stage of research the small scale avalanche risk assessment was performed in order to identify the most common patterns of risk situations and to calculate full social risk and individual risk. The full social avalanche risk for the territory of country was estimated at 91 victims. The area of territory with individual risk values lesser then 1×10(-6) covers more than 92 % of mountain areas of the country. Within these territories the safety of population can be achieved mainly by organizational activities. Approximately 7% of mountain areas have 1×10(-6) - 1×10(-4) individual risk values and require specific mitigation measures to protect people and infrastructure. Territories with individual risk values 1×10(-4) and above covers about 0,1 % of the territory and include the most severe and hazardous mountain areas. The whole specter of mitigation measures is required in order to minimize risk. The future development of such areas is not recommended

  16. Development of Risk Uncertainty Factors from Historical NASA Projects

    Science.gov (United States)

    Amer, Tahani R.

    2011-01-01

    NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

  17. Risk assessment in international operations

    International Nuclear Information System (INIS)

    Stricklin, Daniela L.

    2008-01-01

    During international peace-keeping missions, a diverse number of non-battle hazards may be encountered, which range from heavily polluted areas, endemic disease, toxic industrial materials, local violence, traffic, and even psychological factors. Hence, elevated risk levels from a variety of sources are encountered during deployments. With the emphasis within the Swedish military moving from national defense towards prioritization of international missions in atypical environments, the risk of health consequences, including long term health effects, has received greater consideration. The Swedish military is interested in designing an optimal approach for assessment of health threats during deployments. The Medical Intelligence group at FOI CBRN Security and Defence in Umea has, on request from and in collaboration with the Swedish Armed Forces, reviewed a variety of international health threat and risk assessment models for military operations. Application of risk assessment methods used in different phases of military operations will be reviewed. An overview of different international approaches used in operational risk management (ORM) will be presented as well as a discussion of the specific needs and constraints for health risk assessment in military operations. This work highlights the specific challenges of risk assessment that are unique to the deployment setting such as the assessment of exposures to a variety of diverse hazards concurrently

  18. Implications of probabilistic risk assessment

    International Nuclear Information System (INIS)

    Cullingford, M.C.; Shah, S.M.; Gittus, J.H.

    1987-01-01

    Probabilistic risk assessment (PRA) is an analytical process that quantifies the likelihoods, consequences and associated uncertainties of the potential outcomes of postulated events. Starting with planned or normal operation, probabilistic risk assessment covers a wide range of potential accidents and considers the whole plant and the interactions of systems and human actions. Probabilistic risk assessment can be applied in safety decisions in design, licensing and operation of industrial facilities, particularly nuclear power plants. The proceedings include a review of PRA procedures, methods and technical issues in treating uncertainties, operating and licensing issues and future trends. Risk assessment for specific reactor types or components and specific risks (eg aircraft crashing onto a reactor) are used to illustrate the points raised. All 52 articles are indexed separately. (U.K.)

  19. A review on disaster risk mitigation in the oil and gas project

    Science.gov (United States)

    Rodhi, N. N.; Anwar, N.; Wiguna, I. P. A.

    2018-01-01

    In addition to the very complex risks, hazards potentially lead to disasters in the oil and gas projects. These risks can certainly be anticipated with the application of risk management, but an unsystematic and ineffective implementation of risk management will still bring adverse impacts. According to the eleven risk management principles in ISO 31000:2009, the application of risk management must pay attention to all aspects, both internal and external factors. Thus, this paper aims to identify variables that could affect the disaster mitigation efforts of oil and gas projects. This research began with literature study to determine the problems of risk management in oil and gas projects, so the affecting variables as the study objectives can be specified subsequently based on the literature review as well. The variables that must be considered in the efforts of disaster risk mitigation of oil and gas project are the risk factors and sustainability aspect.

  20. Uncertainties in risk assessment at USDOE facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

    1994-01-01

    The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms{open_quote} risk assessment{close_quote} and{open_quote} risk management{close_quote} are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of {open_quotes}... the most significant data and uncertainties...{close_quotes} in an assessment. Significant data and uncertainties are {open_quotes}...those that define and explain the main risk conclusions{close_quotes}. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation.

  1. Uncertainties in risk assessment at USDOE facilities

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

    1994-01-01

    The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms open-quote risk assessment close-quote and open-quote risk management close-quote are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of open-quotes... the most significant data and uncertainties...close quotes in an assessment. Significant data and uncertainties are open-quotes...those that define and explain the main risk conclusionsclose quotes. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation

  2. Climate induced changes on the hydrology of Mediterranean basins - assessing uncertainties and quantifying risks

    Science.gov (United States)

    Ludwig, Ralf

    2014-05-01

    According to current climate projections, the Mediterranean area is at high risk for severe changes in the hydrological budget and extremes. With innovative scientific measures, integrated hydrological modeling and novel field geophysical field monitoring techniques, the FP7 project CLIMB (Climate Induced Changes on the Hydrology of Mediterranean Basins; GA: 244151) assessed the impacts of climate change on the hydrology in seven basins in the Mediterranean area, in Italy, France, Turkey, Tunisia, Egypt and the Gaza Strip, and quantified uncertainties and risks for the main stakeholders of each test site. Intensive climate model auditing selected four regional climate models, whose data was bias corrected and downscaled to serve as climate forcing for a set of hydrological models in each site. The results of the multi-model hydro-climatic ensemble and socio-economic factor analysis were applied to develop a risk model building upon spatial vulnerability and risk assessment. Findings generally reveal an increasing risk for water resources management in the test sites, yet at different rates and severity in the investigated sectors, with highest impacts likely to occur in the transition months. Most important elements of this research include the following aspects: • Climate change contributes, yet in strong regional variation, to water scarcity in the Mediterranean; other factors, e.g. pollution or poor management practices, are regionally still dominant pressures on water resources. • Rain-fed agriculture needs to adapt to seasonal changes; stable or increasing productivity likely depends on additional irrigation. • Tourism could benefit in shoulder seasons, but may expect income losses in the summer peak season due to increasing heat stress. • Local & regional water managers and water users, lack, as yet, awareness of climate change induced risks; emerging focus areas are supplies of domestic drinking water, irrigation, hydropower and livestock. • Data

  3. Deterministic quantitative risk assessment development

    Energy Technology Data Exchange (ETDEWEB)

    Dawson, Jane; Colquhoun, Iain [PII Pipeline Solutions Business of GE Oil and Gas, Cramlington Northumberland (United Kingdom)

    2009-07-01

    Current risk assessment practice in pipeline integrity management is to use a semi-quantitative index-based or model based methodology. This approach has been found to be very flexible and provide useful results for identifying high risk areas and for prioritizing physical integrity assessments. However, as pipeline operators progressively adopt an operating strategy of continual risk reduction with a view to minimizing total expenditures within safety, environmental, and reliability constraints, the need for quantitative assessments of risk levels is becoming evident. Whereas reliability based quantitative risk assessments can be and are routinely carried out on a site-specific basis, they require significant amounts of quantitative data for the results to be meaningful. This need for detailed and reliable data tends to make these methods unwieldy for system-wide risk k assessment applications. This paper describes methods for estimating risk quantitatively through the calibration of semi-quantitative estimates to failure rates for peer pipeline systems. The methods involve the analysis of the failure rate distribution, and techniques for mapping the rate to the distribution of likelihoods available from currently available semi-quantitative programs. By applying point value probabilities to the failure rates, deterministic quantitative risk assessment (QRA) provides greater rigor and objectivity than can usually be achieved through the implementation of semi-quantitative risk assessment results. The method permits a fully quantitative approach or a mixture of QRA and semi-QRA to suit the operator's data availability and quality, and analysis needs. For example, consequence analysis can be quantitative or can address qualitative ranges for consequence categories. Likewise, failure likelihoods can be output as classical probabilities or as expected failure frequencies as required. (author)

  4. Evaluation of thermal risk assessment

    International Nuclear Information System (INIS)

    Loos, J.J.; Perry, E.S.

    1993-01-01

    Risk assessment was done in 1983 to estimate the ecological hazard of increasing the generating load and thermal output of an electric generating station. Subsequently, long-term monitoring in the vicinity of the station allowed verification of the predictions made in the risk assessment. This presentation will review the efficacy of early risk assessment methods in producing useful predictions from a resource management point of view. In 1984, the Chalk Point Generating facility of the Potomac Electric Power Company increased it's median generating load by 100%. Prior to this operational change, the Academy of Natural Sciences of Philadelphia synthesized site specific data, model predictions, and results from literature to assess the risk of additional waste heat to the Patuxent River subestuary of Chesapeake Bay. Risk was expressed as the number of days per year that various species of fish and the blue crab would be expected to avoid the discharge vicinity. Accuracy of these predictions is assessed by comparing observed fish and crab distributions and their observed frequencies of avoidance to those predicted. It is concluded that the predictions of this early risk assessment were sufficiently accurate to produce a reliable resource management decision

  5. Assessing the risk of carbon dioxide emissions from blue carbon ecosystems

    KAUST Repository

    Lovelock, Catherine E.

    2017-05-15

    "Blue carbon" ecosystems, which include tidal marshes, mangrove forests, and seagrass meadows, have large stocks of organic carbon (C) in their soils. These carbon stocks are vulnerable to decomposition and - if degraded - can be released to the atmosphere in the form of CO. We present a framework to help assess the relative risk of CO emissions from degraded soils, thereby supporting inclusion of soil C into blue carbon projects and establishing a means to prioritize management for their carbon values. Assessing the risk of CO emissions after various kinds of disturbances can be accomplished through knowledge of both the size of the soil C stock at a site and the likelihood that the soil C will decompose to CO.

  6. Baseline risk assessment of ground water contamination at the uranium mill tailings site Salt Lake City, Utah

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This baseline risk assessment of groundwater contamination at the uranium mill tailings site near Salt Lake City, Utah, evaluates potential public health or environmental impacts resulting from ground water contamination at the former uranium ore processing site. The tailings and other contaminated material at this site were placed in a disposal cell located at Clive, Utah, in 1987 by the US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project is to evaluate residual ground water contamination at the former uranium processing site, known as the Vitro processing site. This risk assessment is the first site-specific document under the Ground Water Project. It will help determine the appropriate remedial action for contaminated ground water at the site.

  7. Baseline risk assessment of ground water contamination at the uranium mill tailings site Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1994-09-01

    This baseline risk assessment of groundwater contamination at the uranium mill tailings site near Salt Lake City, Utah, evaluates potential public health or environmental impacts resulting from ground water contamination at the former uranium ore processing site. The tailings and other contaminated material at this site were placed in a disposal cell located at Clive, Utah, in 1987 by the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project is to evaluate residual ground water contamination at the former uranium processing site, known as the Vitro processing site. This risk assessment is the first site-specific document under the Ground Water Project. It will help determine the appropriate remedial action for contaminated ground water at the site

  8. On risk assessment of energy production

    International Nuclear Information System (INIS)

    Kunii, Katsuhiko

    2005-07-01

    Today we cannot ignore the risk of health and/or environment by energy production such as power generation since the risk has been made large enough. In this report an information survey has been done in order to know the outline and points of risk assessment. Based on the information of reports and literature about risk assessment, have been surveyed mainly the external cost assessment of power generation (in which quantification of health and/or environment risk has been done), in addition, risks of disasters, accidents, investments, finance etc. and impacts of those risks on social activities. The remarks obtained by the survey are as follows: 1) Some of external cost assessment of power generation show different results even if the assessment conditions of technology, site, etc. are mostly the same. It is necessary to remark on the information such as basic data, model, background, application limit of assessment considering the reliability. 2) Especially it is considered that the reliability of risk assessment is not enough at present because of the lack of basic data. (author)

  9. Defense Programs Transportation Risk Assessment

    International Nuclear Information System (INIS)

    Clauss, D.B.

    1994-01-01

    This paper provides an overview of the methodology used in a probabilistic transportation risk assessment conducted to assess the probabilities and consequences of inadvertent dispersal of radioactive materials arising from severe transportation accidents. The model was developed for the Defense Program Transportation Risk Assessment (DPTRA) study. The analysis incorporates several enhancements relative to previous risk assessments of hazardous materials transportation including newly-developed statistics on the frequencies and severities of tractor semitrailer accidents and detailed route characterization using the 1990 Census data

  10. Risk Factor Assessment Branch (RFAB)

    Science.gov (United States)

    The Risk Factor Assessment Branch (RFAB) focuses on the development, evaluation, and dissemination of high-quality risk factor metrics, methods, tools, technologies, and resources for use across the cancer research continuum, and the assessment of cancer-related risk factors in the population.

  11. Risk assessment data banks at the Savannah River Site

    International Nuclear Information System (INIS)

    Townsend, C.S.; Durant, W.S.; Baughman, D.F.

    1993-01-01

    In the risk assessment business, it is a well known fact that past mistakes will not be remembered if nothing is done to record them and make them available for future reference and review. The Savannah River Site maintains a computer database system for nonreactor facilities that contains a compilation of the incidents that have occurred since the start up of the Site in 1953. The nationally recognized data banks are highly valued across the US Department of Energy (DOE) complex for their use in risk-related analyses. They provide data for uses such as failure rate analyses, equipment reliability and breakdown studies, project justification, incident investigations, design studies, Safety Analysis Reports, Process Hazards Reviews, consequence analyses, quality assurance studies, trend analyses, management decision, administrative control effectiveness studies, and process problem solving. Five risk assessment data banks exist in the areas of reprocessing, fuel fabrication, waste management, tritium, and the Savannah River Technology Center. The data banks are comprised of approximately one-third million entries collectively and continue to grow at a rate of about two hundred entries per day

  12. Risk assessments ensure safer power

    Energy Technology Data Exchange (ETDEWEB)

    1982-02-19

    A growth industry is emerging devoted to the study and comparison of the economic, social and health risks posed by large industrial installations. Electricity generation is one area coming under particularly close scrutiny. Types of risk, ways of assessing risk and the difference between experts' analyses and the public perception of risk are given. An example of improved risk assessment helping to reduce deaths and injuries in coal mining is included.

  13. A suite of models to support the quantitative assessment of spread in pest risk analysis

    NARCIS (Netherlands)

    Robinet, C.; Kehlenbeck, H.; Werf, van der W.

    2012-01-01

    In the frame of the EU project PRATIQUE (KBBE-2007-212459 Enhancements of pest risk analysis techniques) a suite of models was developed to support the quantitative assessment of spread in pest risk analysis. This dataset contains the model codes (R language) for the four models in the suite. Three

  14. Shedding New Light on Project Portfolio Risk Management

    Directory of Open Access Journals (Sweden)

    Mariusz Hofman

    2017-10-01

    Full Text Available This paper constitutes an innovative attempt to analyse the risks and negative phenomena dependencies within a project portfolio. Based on the available literature, the risks and negative phenomena (that is, the problems with the availability of resources, interpersonal conflicts, irregularities in the portfolio balance, etc. specific to a project portfolio were identified. Theoretical constructs were then used to connect the identified risks with the negative phenomena. Structural equations were used to confirm the existence and quality of these constructs, as well as models describing connections between phenomena. The determination of the structural equations also provided a setting in which statistical methods (χ2, RMSEA and CFI could be used to investigate the level of fit of the constructs and models to the empirical data.

  15. Assess the flood resilience tools integration in the landuse projects

    Science.gov (United States)

    Moulin, E.; Deroubaix, J.-F.

    2012-04-01

    Despite a severe regulation concerning the building in flooding areas, 80% of these areas are already built in the Greater Paris (Paris, Val-de-Marne, Hauts-de-Seine and Seine-Saint-Denis). The land use in flooding area is presented as one of the main solutions to solve the ongoing real estate pressure. For instance some of the industrial wastelands located along the river are currently in redevelopment and residential buildings are planned. So the landuse in the flooding areas is currently a key issue in the development of the Greater Paris area. To deal with floods there are some resilience tools, whether structural (such as perimeter barriers or building aperture barriers, etc) or non structural (such as warning systems, etc.). The technical solutions are available and most of the time efficient1. Still, we notice that these tools are not much implemented. The people; stakeholders and inhabitants, literally seems to be not interested. This papers focus on the integration of resilience tools in urban projects. Indeed one of the blockages in the implementation of an efficient flood risk prevention policy is the lack of concern of the landuse stakeholders and the inhabitants for the risk2. We conducted an important number of interviews with stakeholders involved in various urban projects and we assess, in this communication, to what extent the improvement of the resilience to floods is considered as a main issue in the execution of an urban project? How this concern is maintained or could be maintained throughout the project. Is there a dilution of this concern? In order to develop this topic we rely on a case study. The "Ardoines" is a project aiming at redeveloping an industrial site (South-East Paris), into a project including residential and office buildings and other amenities. In order to elaborate the master plan, the urban planning authority brought together some flood risk experts. According to the comments of the experts, the architect in charge of the

  16. Risk assessment

    DEFF Research Database (Denmark)

    Pedersen, Liselotte; Rasmussen, Kirsten; Elsass, Peter

    2010-01-01

    International research suggests that using formalized risk assessment methods may improve the predictive validity of professionals' predictions of risk of future violence. This study presents data on forensic psychiatric patients discharged from a forensic unit in Denmark in year 2001-2002 (n=107...... and the individual dynamic items strengthen the use of this scheme in clinical practice. (PsycINFO Database Record (c) 2010 APA, all rights reserved) (journal abstract)...

  17. Current developments in the assessment of petroleum hydrocarbon contaminated sites: Analysis, interpretation, and use of the TPH parameter for quantitative risk assessment

    International Nuclear Information System (INIS)

    Garcia-Surette, M.; Maynard, P.; Lamie, P.O.; Kaslick, C.

    1995-01-01

    In 1994, the Massachusetts Department of Environmental Protection (MDEP) estimated that petroleum-only cases comprised approximately one-half of the state's hazardous waste sites currently under investigation and/or remediation. Because of this significant percentage, it became clear that assessing petroleum sites more efficiently in terms of risk and cleanup alternatives was necessary. One of these key MDEP policies describes an alternative risk assessment approach enabling the quantitative characterization of total petroleum hydrocarbon (TPH)-related health risks. The approach relies on the use of an analytical technique by which the mass of petroleum hydrocarbons within specified carbon ranges is quantified. MDEP's TPH risk assessment approach was successfully employed at a residential site contaminated with No. 2 fuel oil. The combined use of MDEP's suggested analytical methods, alternative reference compounds and toxicity values, as well as chromatograms, standard dose equations, and an EPA-approved box model, facilitated the performance of a more realistic and cost-effective assessment of risk. Such assessment provided key management information to regulatory agencies, and project managers, as well as property owners concerned with potential property value loss

  18. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase I), and the Ground Water Project (phase II). For the UMTRA Project site located near Naturita, Colorado (the Naturita site), phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado, about 13 road miles (mi) (21 kilometers [km]) to the northwest. No uranium mill tailings are involved because the tailings were removed from the Naturita site and placed at Coke Oven, Colorado, during 1977 to 1979. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health or the environment; and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has received contaminated ground water. Therefore, a risk assessment is conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

  19. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1995-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase I), and the Ground Water Project (phase II). For the UMTRA Project site located near Naturita, Colorado (the Naturita site), phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation's Upper Burbank Repository at Uravan, Colorado, about 13 road miles (mi) (21 kilometers [km]) to the northwest. No uranium mill tailings are involved because the tailings were removed from the Naturita site and placed at Coke Oven, Colorado, during 1977 to 1979. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health or the environment; and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has received contaminated ground water. Therefore, a risk assessment is conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment

  20. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  1. Sudden Cardiac Arrest (SCA) Risk Assessment

    Science.gov (United States)

    ... HRS Find a Specialist Share Twitter Facebook SCA Risk Assessment Sudden Cardiac Arrest (SCA) occurs abruptly and without ... people of all ages and health conditions. Start Risk Assessment The Sudden Cardiac Arrest (SCA) Risk Assessment Tool ...

  2. The role of risk assessment in remedial action cleanup programs (RACP): A case history

    International Nuclear Information System (INIS)

    Fessler, R.G.; Bergmann, W.R.; Greenberg, A.J.

    1988-01-01

    A RACP (Remedial Action Cleanup Program) selects site cleanup criteria that protect human health and the environment and are cost effective. They generally use existing environmental standards and/or guidelines which include safe drinking water, RCRA groundwater protection, threshold limit values and air quality standards, and recommended soil cleanup level guidelines. If these are the only criteria used, the RACP may be more stringent and expensive than necessary. Another step, a risk assessment program, should then be considered in the cleanup decision process. A risk assessment uses chemical concentrations observed in soils, groundwater, and air to project their impact on human health and the environment. Toxicological data on human exposure to these concentrations (LD 50s and carcinogenic action levels) are used to assess risks to human health and the environment. The risk assessment also considers the probability of exposure. E.g., remedial programs at Superfund sites consider three criteria in order to assess risks to human health and the environment: (1) pathways of exposure, (2) population at risk, and (3) chemicals of concern. By eliminating or severely limiting the significance of any criteria, the site may no longer represent a significant risk. This paper presents a RACP case history where a risk assessment was needed to select a cost effective and environmentally acceptable cleanup program

  3. The prostate cancer risk stratification (ProCaRS) project: Recursive partitioning risk stratification analysis

    International Nuclear Information System (INIS)

    Rodrigues, George; Lukka, Himu; Warde, Padraig; Brundage, Michael; Souhami, Luis; Crook, Juanita; Cury, Fabio; Catton, Charles; Mok, Gary; Martin, Andre-Guy; Vigneault, Eric; Morris, Jim; Warner, Andrew; Gonzalez Maldonado, Sandra; Pickles, Tom

    2013-01-01

    Background: The Genitourinary Radiation Oncologists of Canada (GUROC) published a three-group risk stratification (RS) system to assist prostate cancer decision-making in 2001. The objective of this project is to use the ProCaRS database to statistically model the predictive accuracy and clinical utility of a proposed new multi-group RS schema. Methods: The RS analyses utilized the ProCaRS database that consists of 7974 patients from four Canadian institutions. Recursive partitioning analysis (RPA) was utilized to explore the sub-stratification of groups defined by the existing three-group GUROC scheme. 10-fold cross-validated C-indices and the Net Reclassification Index were both used to assess multivariable models and compare the predictive accuracy of existing and proposed RS systems, respectively. Results: The recursive partitioning analysis has suggested that the existing GUROC classification system could be altered to accommodate as many as six separate and statistical unique groups based on differences in BFFS (C-index 0.67 and AUC 0.70). GUROC low-risk patients would be divided into new favorable-low and low-risk groups based on PSA ⩽6 and PSA >6. GUROC intermediate-risk patients can be subclassified into low-intermediate and high-intermediate groups. GUROC high-intermediate-risk is defined as existing GUROC intermediate-risk with PSA >=10 AND either T2b/c disease or T1T2a disease with Gleason 7. GUROC high-risk patients would be subclassified into an additional extreme-risk group (GUROC high-risk AND (positive cores ⩾87.5% OR PSA >30). Conclusions: Proposed RS subcategories have been identified by a RPA of the ProCaRS database

  4. ASTARTE: Assessment Strategy and Risk Reduction for Tsunamis in Europe

    Science.gov (United States)

    Baptista, M. A.; Yalciner, A. C.; Canals, M.

    2014-12-01

    Tsunamis are low frequency but high impact natural disasters. In 2004, the Boxing Day tsunami killed hundreds of thousands of people from many nations along the coastlines of the Indian Ocean. Tsunami run-up exceeded 35 m. Seven years later, and in spite of some of the best warning technologies and levels of preparedness in the world, the Tohoku-Oki tsunami in Japan dramatically showed the limitations of scientific knowledge on tsunami sources, coastal impacts and mitigation measures. The experience from Japan raised serious questions on how to improve the resilience of coastal communities, to upgrade the performance of coastal defenses, to adopt a better risk management, and also on the strategies and priorities for the reconstruction of damaged coastal areas. Societal resilience requires the reinforcement of capabilities to manage and reduce risk at national and local scales.ASTARTE (Assessment STrategy And Risk for Tsunami in Europe), a 36-month FP7 project, aims to develop a comprehensive strategy to mitigate tsunami impact in this region. To achieve this goal, an interdisciplinary consortium has been assembled. It includes all CTWPs of NEAM and expert institutions across Europe and worldwide. ASTARTE will improve i) basic knowledge of tsunami generation and recurrence going beyond simple catalogues, with novel empirical data and new statistical analyses for assessing long-term recurrence and hazards of large events in sensitive areas of NEAM, ii) numerical techniques for tsunami simulation, with focus on real-time codes and novel statistical emulation approaches, and iii) methods for assessment of hazard, vulnerability, and risk. ASTARTE will also provide i) guidelines for tsunami Eurocodes, ii) better tools for forecast and warning for CTWPs and NTWCs, and iii) guidelines for decision makers to increase sustainability and resilience of coastal communities. In summary, ASTARTE will develop basic scientific and technical elements allowing for a significant

  5. Risk assessment in the management of newly diagnosed classical Hodgkin lymphoma.

    Science.gov (United States)

    Connors, Joseph M

    2015-03-12

    Treatment of Hodgkin lymphoma is associated with 2 major types of risk: that the treatment may fail to cure the disease or that the treatment will prove unacceptably toxic. Careful assessment of the amount of the lymphoma (tumor burden), its behavior (extent of invasion or specific organ compromise), and host related factors (age; coincident systemic infection; and organ dysfunction, especially hematopoietic, cardiac, or pulmonary) is essential to optimize outcome. Elaborately assembled prognostic scoring systems, such as the International Prognostic Factors Project score, have lost their accuracy and value as increasingly effective chemotherapy and supportive care have been developed. Identification of specific biomarkers derived from sophisticated exploration of Hodgkin lymphoma biology is bringing promise of further improvement in targeted therapy in which effectiveness is increased at the same time off-target toxicity is diminished. Parallel developments in functional imaging are providing additional potential to evaluate the efficacy of treatment while it is being delivered, allowing dynamic assessment of risk during chemotherapy and adaptation of the therapy in real time. Risk assessment in Hodgkin lymphoma is continuously evolving, promising ever greater precision and clinical relevance. This article explores the past usefulness and the emerging potential of risk assessment for this imminently curable malignancy. © 2015 by The American Society of Hematology.

  6. NASA Space Radiation Risk Project: Overview and Recent Results

    Science.gov (United States)

    Blattnig, Steve R.; Chappell, Lori J.; George, Kerry A.; Hada, Megumi; Hu, Shaowen; Kidane, Yared H.; Kim, Myung-Hee Y.; Kovyrshina, Tatiana; Norman, Ryan B.; Nounu, Hatem N.; hide

    2015-01-01

    The NASA Space Radiation Risk project is responsible for integrating new experimental and computational results into models to predict risk of cancer and acute radiation syndrome (ARS) for use in mission planning and systems design, as well as current space operations. The project has several parallel efforts focused on proving NASA's radiation risk projection capability in both the near and long term. This presentation will give an overview, with select results from these efforts including the following topics: verification, validation, and streamlining the transition of models to use in decision making; relative biological effectiveness and dose rate effect estimation using a combination of stochastic track structure simulations, DNA damage model calculations and experimental data; ARS model improvements; pathway analysis from gene expression data sets; solar particle event probabilistic exposure calculation including correlated uncertainties for use in design optimization.

  7. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    Science.gov (United States)

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  8. A Framework for Integrating Knowledge Management with Risk Management for Information Technology Projects (RiskManiT)

    Science.gov (United States)

    Karadsheh, Louay A.

    2010-01-01

    This research focused on the challenges experienced when executing risk management activities for information technology projects. The lack of adequate knowledge management support of risk management activities has caused many project failures in the past. The research objective was to propose a conceptual framework of the Knowledge-Based Risk…

  9. Improvement of the projection models for radiogenic cancer risk

    International Nuclear Information System (INIS)

    Tong Jian

    2005-01-01

    Calculations of radiogenic cancer risk are based on the risk projection models for specific cancer sites. Improvement has been made for the parameters used in the previous models including introductions of mortality and morbidity risk coefficients, and age-/ gender-specific risk coefficients. These coefficients have been applied to calculate the radiogenic cancer risks for specific organs and radionuclides under different exposure scenarios. (authors)

  10. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  11. Identification of risk factors affecting construction of projects: The case of emerging economy

    Directory of Open Access Journals (Sweden)

    Chipo Mellania Maseko

    2017-12-01

    Full Text Available Controlling project risks has become a daunting task in construction and this can be attributed to issues such as the nature of modern projects. The challenge is that risk appears unannounced at any project phase for various reasons and thereby affecting the performance and the success of unprepared projects. The current studies that explored risk matters include Pehlivan and Öztemir (2015, Katre, and Ghaitidak (2016 amongst others. However, there is absence of unanimity from these studies on risk factors in construction. Thus, this article was instigated in order to identify and classify risk factors that affect the chances of project success. The research methodology selected for this article comprised of peer-reviewed articles between the periods of 2007 to 2017. This approach involved a comprehensive scrutiny into scholarly articles to comprehend risks in construction projects. Following a conceptual analysis, eighty factors were identified and classified under the following; technical, construction, financial, socio-political, physical, organisational, and environmental and other risks. From these categories, political instability was, found to be the most influential risk factor in construction projects and this factor was classified within the socio-political category and this category has total of 11 factors. Finding suggests the need for further empirical study.

  12. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  13. Assessing Your Weight and Health Risk

    Science.gov (United States)

    ... Health Professional Resources Assessing Your Weight and Health Risk Assessment of weight and health risk involves using ... risk for developing obesity-associated diseases or conditions. Risk Factors for Health Topics Associated With Obesity Along ...

  14. Flood risk assessment in France: comparison of extreme flood estimation methods (EXTRAFLO project, Task 7)

    Science.gov (United States)

    Garavaglia, F.; Paquet, E.; Lang, M.; Renard, B.; Arnaud, P.; Aubert, Y.; Carre, J.

    2013-12-01

    In flood risk assessment the methods can be divided in two families: deterministic methods and probabilistic methods. In the French hydrologic community the probabilistic methods are historically preferred to the deterministic ones. Presently a French research project named EXTRAFLO (RiskNat Program of the French National Research Agency, https://extraflo.cemagref.fr) deals with the design values for extreme rainfall and floods. The object of this project is to carry out a comparison of the main methods used in France for estimating extreme values of rainfall and floods, to obtain a better grasp of their respective fields of application. In this framework we present the results of Task 7 of EXTRAFLO project. Focusing on French watersheds, we compare the main extreme flood estimation methods used in French background: (i) standard flood frequency analysis (Gumbel and GEV distribution), (ii) regional flood frequency analysis (regional Gumbel and GEV distribution), (iii) local and regional flood frequency analysis improved by historical information (Naulet et al., 2005), (iv) simplify probabilistic method based on rainfall information (i.e. Gradex method (CFGB, 1994), Agregee method (Margoum, 1992) and Speed method (Cayla, 1995)), (v) flood frequency analysis by continuous simulation approach and based on rainfall information (i.e. Schadex method (Paquet et al., 2013, Garavaglia et al., 2010), Shyreg method (Lavabre et al., 2003)) and (vi) multifractal approach. The main result of this comparative study is that probabilistic methods based on additional information (i.e. regional, historical and rainfall information) provide better estimations than the standard flood frequency analysis. Another interesting result is that, the differences between the various extreme flood quantile estimations of compared methods increase with return period, staying relatively moderate up to 100-years return levels. Results and discussions are here illustrated throughout with the example

  15. The Strategic Risk Management at Different Stages of Innovation Project

    Directory of Open Access Journals (Sweden)

    Pysmak Viktoriia O.

    2017-03-01

    Full Text Available This article considers the theoretical principles of the strategic risk management at every stage of innovation project. Relevance of the selected area of research has been substantiated in view of the necessity to provide the theoretical and practical foundations for the strategic risk management of innovation activity. Principles of management of innovation at a contemporary enterprise have been allocated. Analysis of such concepts as «risk», «innovation», «strategic management» was carried out. The concept of «innovation project» has been considered, its features and characteristics have been allocated. The basic tools of the strategic management of enterprise in current conditions have been described. The basic principles of the strategic risk management of innovation activity have been formulated. A scheme with allocating the stages of innovation activity and the risks involved has been elaborated, taking into consideration the factors of occurrence of risks. The main groups of management strategies have been allocated. The tasks facing the managerial board in the process of the strategic risk management at every stage of the innovation project have been formulated.

  16. Risk assessment of the Krsko NPP normal operation on the public in the Zagreb area

    International Nuclear Information System (INIS)

    Skanata, D.; Pevec, D.

    1994-01-01

    In the paper, a very short review of the ICRP recommendations related to effective dose limitation for the workers as well as for the public, is given. Particular attention is paid to the risk coefficients values. In the short manner, description of the applied methodology and achieved result related to the risk assessment of the Krsko NPP normal operation on the public in the Zagreb Area, are given too. The mentioned assessment was performed as an activity within the Case Study Zagreb Project developed under the Inter-Agency Programme on the Assessment and Management of Health and Environmental Risks from Energy and Other Complex Industrial Systems (UNEP, WHO, IAEA and UNIDO). Making comparison between assessment risk of the Krsko NPP normal operation and risks to which inhabitants of the City of Zagreb are normally exposed, it is concluded that living in the vicinity of such nuclear power plant as it is Krsko NPP (PWR, 664 MWe), is not so risky as risky are some everyday activities

  17. Tidd PFBC Demonstration Project, A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2001-08-31

    The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded technology development effort to demonstrate a new generation of innovative coal utilization processes. One goal of the program is to furnish the energy marketplace with a variety of energy efficient, environmentally superior coal-based technologies. Demonstration projects seek to establish the commercial feasibility of the most promising coal technologies that have proceeded beyond the proof-of-concept stage. This report is a post-project assessment of the DOE CCT Demonstration Program, the Tidd PFBC Demonstration Project. A major objective of the CCT Program is to provide the technical data necessary for the private sector to proceed confidently with the commercial replication of the demonstrated technologies. An essential element of meeting this goal is the dissemination of results from the demonstration projects. This post-project assessment (PPA) report is an independent DOE appraisal of the successes that the completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology, as well as an analysis of the commercial market.

  18. Risk assessment theory, methods, and applications

    CERN Document Server

    Rausand, Marvin

    2011-01-01

    With its balanced coverage of theory and applications along with standards and regulations, Risk Assessment: Theory, Methods, and Applications serves as a comprehensive introduction to the topic. The book serves as a practical guide to current risk analysis and risk assessment, emphasizing the possibility of sudden, major accidents across various areas of practice from machinery and manufacturing processes to nuclear power plants and transportation systems. The author applies a uniform framework to the discussion of each method, setting forth clear objectives and descriptions, while also shedding light on applications, essential resources, and advantages and disadvantages. Following an introduction that provides an overview of risk assessment, the book is organized into two sections that outline key theory, methods, and applications. * Introduction to Risk Assessment defines key concepts and details the steps of a thorough risk assessment along with the necessary quantitative risk measures. Chapters outline...

  19. Site-Specific ecological risk assessment. Case-study 2

    DEFF Research Database (Denmark)

    Jensen, John

    “Development of a decision support system for sustainable management of contaminated land by linking bioavailability, ecological risk and ground water pollution of organic pollutants”or in short “LIBERATION”. The presentation includes examples on how to scale and integrate the results from various scientific......The decision supporting and integrating assessment tool, TRIAD, is used site-specific on PAH- and heavy metal contaminated sites in Denmark. The various aspects of the TRIAD approach are used on a set of chemistry-, ecotoxicology- and ecology related data collected among others in the EU project...

  20. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Green River, Utah. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase 1) and the Ground Water Project (phase 2). For the UMTRA Project site located near Green River, Utah, the Surface Project cleanup occurred from 1988 to 1989. The tailings and radioactively contaminated soils and materials were removed from their original locations and placed into a disposal cell on the site. The disposal cell is designed to minimize radiation emissions and minimize further contamination of ground water beneath the site. The UMTRA Project`s second phase, the Ground Water Project, evaluates the nature and extent of ground water contamination resulting from uranium processing and determines a strategy for ground water compliance with the Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. For the Green River site, the risk assessment helps determine whether human health risks result from exposure to ground water contaminated by uranium processing. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Project at the Green River site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine what is necessary, if anything, to protect human health and the environment while complying with EPA standards.