WorldWideScience

Sample records for rising construction costs

  1. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  2. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  3. Construction Costs Assessment of Structural Systems for Low-Rise and Social Welfare Housing

    Directory of Open Access Journals (Sweden)

    Carrillo Julián

    2015-09-01

    Full Text Available A comparative analysis of the costs related to the construction of low-rise, low-cost and social welfare housing was carried out. The study included three of the most commonly used structural systems for low-rise housing in Latin America, such as the traditional system of confined masonry walls, concrete walls conventionally reinforced with welded-wire meshes and concrete walls reinforced with steel fiber. The cost comparison was carried out by budgets analysis, which were performed based on construction quantities, unit prices and particular items for each structural system. It was found in the study that, from an economic point of view, the systems of concrete walls reinforced with welded-wire meshes or steel fibers are more advantageous than confined masonry systems. In addition, the integral comparison of the three structural systems demonstrates that the industrialized system of steel fiber reinforced concrete walls allows obtaining greater advantages of cleaning and sustainability, faster construction, lower cost and a more attractive scenario for builders investing in such projects.

  4. Model of investment appraisal of high-rise construction with account of cost of land resources

    Science.gov (United States)

    Okolelova, Ella; Shibaeva, Marina; Trukhina, Natalya

    2018-03-01

    The article considers problems and potential of high-rise construction as a global urbanization. The results of theoretical and practical studies on the appraisal of investments in high-rise construction are provided. High-rise construction has a number of apparent upsides in modern terms of development of megapolises and primarily it is economically efficient. Amid serious lack of construction sites, skyscrapers successfully deal with the need of manufacturing, office and living premises. Nevertheless, there are plenty issues, which are related with high-rise construction, and only thorough scrutiny of them allow to estimate the real economic efficiency of this branch. The article focuses on the question of economic efficiency of high-rise construction. The suggested model allows adjusting the parameters of a facility under construction, setting the tone for market value as well as the coefficient for appreciation of the construction net cost, that depends on the number of storey's, in the form of function or discrete values.

  5. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  6. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    Science.gov (United States)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  7. Regional approaches in high-rise construction

    Science.gov (United States)

    Iconopisceva, O. G.; Proskurin, G. A.

    2018-03-01

    The evolutionary process of high-rise construction is in the article focus. The aim of the study was to create a retrospective matrix reflecting the tasks of the study such as: structuring the most iconic high-rise objects within historic boundaries. The study is based on contemporary experience of high-rise construction in different countries. The main directions and regional specifics in the field of high-rise construction as well as factors influencing the further evolution process are analyzed. The main changes in architectural stylistics, form-building, constructive solutions that focus on the principles of energy efficiency and bio positivity of "sustainable buildings", as well as the search for a new typology are noted. The most universal constructive methods and solutions that turned out to be particularly popular are generalized. The new typology of high-rises and individual approach to urban context are noted. The results of the study as a graphical scheme made it possible to represent the whole high-rise evolution. The new spatial forms of high-rises lead them to new role within the urban environments. Futuristic hyperscalable concepts take the autonomous urban space functions itself and demonstrate us how high-rises can replace multifunctional urban fabric, developing it inside their shells.

  8. Socioecological Aspects of High-rise Construction

    Science.gov (United States)

    Eichner, Michael; Ivanova, Zinaida

    2018-03-01

    In this article, the authors consider the socioecological problems that arise in the construction and operation of high-rise buildings. They study different points of view on high-rise construction and note that the approaches to this problem are very different. They also analyse projects of modern architects and which attempts are made to overcome negative impacts on nature and mankind. The article contains materials of sociological research, confirming the ambivalent attitude of urban population to high-rise buildings. In addition, one of the author's sociological survey reveals the level of environmental preparedness of the university students, studying in the field of "Construction of unique buildings and structures", raising the question of how future specialists are ready to take into account socioecological problems. Conclusion of the authors: the construction of high-rise buildings is associated with huge social and environmental risks, negative impact on the biosphere and human health. This requires deepened skills about sustainable design methods and environmental friendly construction technologies of future specialists. Professor M. Eichner presents in the article his case study project results on implementation of holistic eco-sustainable construction principles for mixed-use high-rise building in the metropolis of Cairo.

  9. Socioecological Aspects of High-rise Construction

    Directory of Open Access Journals (Sweden)

    Eichner Michael

    2018-01-01

    Full Text Available In this article, the authors consider the socioecological problems that arise in the construction and operation of high-rise buildings. They study different points of view on high-rise construction and note that the approaches to this problem are very different. They also analyse projects of modern architects and which attempts are made to overcome negative impacts on nature and mankind. The article contains materials of sociological research, confirming the ambivalent attitude of urban population to high-rise buildings. In addition, one of the author’s sociological survey reveals the level of environmental preparedness of the university students, studying in the field of "Construction of unique buildings and structures", raising the question of how future specialists are ready to take into account socioecological problems. Conclusion of the authors: the construction of high-rise buildings is associated with huge social and environmental risks, negative impact on the biosphere and human health. This requires deepened skills about sustainable design methods and environmental friendly construction technologies of future specialists. Professor M. Eichner presents in the article his case study project results on implementation of holistic eco-sustainable construction principles for mixed-use high-rise building in the metropolis of Cairo.

  10. Strategic advantages of high-rise construction

    Directory of Open Access Journals (Sweden)

    Yaskova Natalya

    2018-01-01

    Full Text Available Traditional methods to assess the competitiveness of different types of real estate in the context of huge changes of new technological way of life don’t provide building solutions that would be correct from a strategic perspective. There are many challenges due to changes in the consumers’ behavior in the housing area. A multiplicity of life models, a variety of opportunities and priorities, traditions and new trends in construction should be assessed in terms of prospective benefits in the environment of the emerging new world order. At the same time, the mane discourse of high-rise construction mainly relates to its design features, technical innovations, and architectural accents. We need to clarify the criteria for economic evaluation of high-rise construction in order to provide decisions with clear and quantifiable contexts. The suggested approach to assessing the strategic advantage of high-rise construction and the prospects for capitalization of high-rise buildings poses new challenges for the economy to identify adequate quantitative assessment methods of the high-rise buildings economic efficiency, taking into account all stages of their life cycle.

  11. Strategic advantages of high-rise construction

    Science.gov (United States)

    Yaskova, Natalya

    2018-03-01

    Traditional methods to assess the competitiveness of different types of real estate in the context of huge changes of new technological way of life don't provide building solutions that would be correct from a strategic perspective. There are many challenges due to changes in the consumers' behavior in the housing area. A multiplicity of life models, a variety of opportunities and priorities, traditions and new trends in construction should be assessed in terms of prospective benefits in the environment of the emerging new world order. At the same time, the mane discourse of high-rise construction mainly relates to its design features, technical innovations, and architectural accents. We need to clarify the criteria for economic evaluation of high-rise construction in order to provide decisions with clear and quantifiable contexts. The suggested approach to assessing the strategic advantage of high-rise construction and the prospects for capitalization of high-rise buildings poses new challenges for the economy to identify adequate quantitative assessment methods of the high-rise buildings economic efficiency, taking into account all stages of their life cycle.

  12. Economics of high-rise construction: the feasibility of skyscrapers building in the Russian cities

    Science.gov (United States)

    Petrov, Artur; Petrova, Daria

    2018-03-01

    The article considers the economic aspects of constructing high-rise buildings in the world and in Russia. Data on the number of high-rise buildings in Russian cities with a million population are presented. It is proved that interest in high-rise construction in Russia has been formed only in Moscow and partly in St. Petersburg and Yekaterinburg. The analysis showed that the reason for this is the expensiveness of high-rise construction. According to the enlarged macro-calculation, the cost of building 1 m2 of the area of the Federation Towers complex (Moscow City) is about 2710 /m2. Practically a possibility of return on investments in the foreseeable time interval exists only in Moscow. For the regions of Russia this task is rather complicated. Population density in regional Russian cities is quite low, business entities do not have the necessary financial resources for investing in high-rise construction, and investments from abroad absent.

  13. Trend analysis of modern high-rise construction

    Science.gov (United States)

    Radushinsky, Dmitry; Gubankov, Andrey; Mottaeva, Asiiat

    2018-03-01

    The article reviews the main trends of modern high-rise construction considered a number of architectural, engineering and technological, economic and image factors that have influenced the intensification of construction of high-rise buildings in the 21st century. The key factors of modern high-rise construction are identified, which are associated with an attractive image component for businessmen and politicians, with the ability to translate current views on architecture and innovations in construction technologies and the lobbying of relevant structures, as well as the opportunity to serve as an effective driver in the development of a complex of national economy sectors with the achievement of a multiplicative effect. The estimation of the priority nature of participation of foreign architectural bureaus in the design of super-high buildings in Russia at the present stage is given. The issue of economic expediency of construction of high-rise buildings, including those with only a residential function, has been investigated. The connection between the construction of skyscrapers as an important component of the image of cities in the marketing of places and territories, the connection of the availability of a high-rise center, the City, with the possibilities of attracting a "creative class" and the features of creating a large working space for specialists on the basis of territorial proximity and density of high-rise buildings.

  14. Formation of costs of high-rise objects of housing and civil purpose based on enlarged norms

    Science.gov (United States)

    Vorotyntseva, Anna; Ovsiannikov, Andrei; Bolgov, Vladimir

    2018-03-01

    When determining the cost of capital construction objects, for purposes of pre-design workings out and purposes of initial maximum initial price determination on tenders, construction price norms are used (CPNs). Modern CPNs are not designed to determine the value of high-rise buildings. It is necessary to adapt modern CPNs to get opportunity for the possibility to take into account special cost factors in determining the cost of high-rise buildings. The main ways can be: selection of new representative objects or application of additional correction factors.

  15. Leasing instruments of high-rise construction financing

    Science.gov (United States)

    Aleksandrova, Olga; Ivleva, Elena; Sukhacheva, Viktoria; Rumyantseva, Anna

    2018-03-01

    The leasing sector of the business economics is expanding. Leasing instruments for high-rise construction financing allow to determine the best business behaviour in the leasing economy sector, not only in the sphere of transactions with equipment and vehicles. Investments in high-rise construction have a multiplicative effect. It initiates an active search and leasing instruments use in the economic behaviour of construction organizations. The study of the high-rise construction sector in the structure of the leasing market participants significantly expands the leasing system framework. The scheme of internal and external leasing process factors influence on the result formation in the leasing sector of economy is offered.

  16. The advisability of high-rise construction in the city

    Science.gov (United States)

    Sergievskaya, Natalia; Pokrovskaya, Tatyana; Vorontsova, Natalya

    2018-03-01

    In this article there discusses the question of advisability high-rise construction, the reasons for its use, both positive and negative sides of it. On the one hand, a number of authors believe that it is difficult to avoid high-rise construction due to the limited areas in very large cities. On the other hand, a number of other authors draw attention to the problems associated with high-rise construction. The author of the article analyses examples of high-rise construction in several countries (UAE, Dubai "Burj Khalifa"; Japan "Tokyo Sky Tree"; United States of America, "Willis Tower"; Russia "Federation Tower") and proves the advisability of high-rise construction in the city.

  17. Problems of increased transport load as a result of implementation of projects of high-rise constructions

    Science.gov (United States)

    Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda

    2018-03-01

    The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.

  18. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    Directory of Open Access Journals (Sweden)

    Beliakov Sergei

    2018-01-01

    Full Text Available Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  19. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    Science.gov (United States)

    Beliakov, Sergei

    2018-03-01

    Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  20. Model and Algorithm for Substantiating Solutions for Organization of High-Rise Construction Project

    Directory of Open Access Journals (Sweden)

    Anisimov Vladimir

    2018-01-01

    Full Text Available In the paper the models and the algorithm for the optimal plan formation for the organization of the material and logistical processes of the high-rise construction project and their financial support are developed. The model is based on the representation of the optimization procedure in the form of a non-linear problem of discrete programming, which consists in minimizing the execution time of a set of interrelated works by a limited number of partially interchangeable performers while limiting the total cost of performing the work. The proposed model and algorithm are the basis for creating specific organization management methodologies for the high-rise construction project.

  1. Model and Algorithm for Substantiating Solutions for Organization of High-Rise Construction Project

    Science.gov (United States)

    Anisimov, Vladimir; Anisimov, Evgeniy; Chernysh, Anatoliy

    2018-03-01

    In the paper the models and the algorithm for the optimal plan formation for the organization of the material and logistical processes of the high-rise construction project and their financial support are developed. The model is based on the representation of the optimization procedure in the form of a non-linear problem of discrete programming, which consists in minimizing the execution time of a set of interrelated works by a limited number of partially interchangeable performers while limiting the total cost of performing the work. The proposed model and algorithm are the basis for creating specific organization management methodologies for the high-rise construction project.

  2. Construction cost impact analysis of the U.S. Department of Energy mandatory performance standards for new federal commercial and multi-family, high-rise residential buildings

    International Nuclear Information System (INIS)

    Di Massa, F.V.; Hadley, D.L.; Halverson, M.A.

    1993-12-01

    In accordance with federal legislation, the U.S. Department of Energy (DOE) has conducted a project to demonstrate use of its Energy Conservation Voluntary Performance Standards for Commercial and Multi-Family High-Rise Residential Buildings; Mandatory for New Federal Buildings; Interim Rule (referred to in this report as DOE-1993). A key requisite of the legislation requires DOE to develop commercial building energy standards that are cost effective. During the demonstration project, DOE specifically addressed this issue by assessing the impacts of the standards on (1) construction costs, (2) builders (and especially small builders) of multi-family, high-rise buildings, and (3) the ability of low-to moderate-income persons to purchase or rent units in such buildings. This document reports on this project

  3. Application of tuned mass dampers in high-rise construction

    Science.gov (United States)

    Teplyshev, Vyacheslav; Mylnik, Alexey; Pushkareva, Maria; Agakhanov, Murad; Burova, Olga

    2018-03-01

    The article considers the use of tuned mass dampers in high-rise construction for significant acceleration and amplitude of vibrations of the upper floors under dynamic wind influences. The susceptibility of people to accelerations in high-rise buildings and possible means of reducing wind-induced fluctuations in buildings are analyzed. The statistics of application of tuned mass dampers in high-rise construction all over the world is presented. The goal of the study is to identify an economically attractive solution that allows the fullest use of the potential of building structures in high-rise construction, abandoning the need to build massive frames leading to over-consumption of materials.

  4. Specific features of modern multifunctional high-rise building construction

    Science.gov (United States)

    Manukhina, Lyubov; Samosudova, Natal'ja

    2018-03-01

    The article analyzes the main reasons for the development of high-rise building construction the most important of which-is a limitation of the urban areas and, consequently, the high price of land reserved for construction. New engineering and compositional solutions for the creation of new types of buildings are considered - complex technical designs of a large number of storeys completely meet the new requirements for safety and comfort. Some peculiarities of designing high-rise buildings and searching for optimal architectural and planning solutions are revealed since, with external architectural simplicity, high-rise buildings have complex structural and technological and space-planning solutions. We consider the specific features of a high-rise housing in various countries around the world, including Russia, such as the layout of the multi-storey residential buildings, depending on the climatic characteristics of the regions, assessment of the geological risk of the construction site, the choice of parameters and functional purpose of the sections of the territory of high-rise construction, location of the town-planning object for substantiating the overall dimensions of the building, assessment of changes aeration and engineering and hydrological conditions of the site. A special place in the article on the problems of improvement of the territory, the device of courtyards, landscaping, the device of playing and sports grounds. The main conclusion in the article is the following problem - when developing high-rise housing construction, the development of high-rise housing, and an increase in the population density in the territory of large cities of Russia, necessary to create a comfortable and safe level of residents living and not a decrease, but an improvement in the quality of the urban environment.

  5. Accidents Preventive Practice for High-Rise Construction

    Directory of Open Access Journals (Sweden)

    Goh Kai Chen

    2016-01-01

    Full Text Available The demand of high-rise projects continues to grow due to the reducing of usable land area in Klang Valley, Malaysia. The rapidly development of high-rise projects has leaded to the rise of fatalities and accidents. An accident that happened in a construction site can cause serious physical injury. The accidents such as people falling from height and struck by falling object were the most frequent accidents happened in Malaysian construction industry. The continuous growth of high-rise buildings indicates that there is a need of an effective safety and health management. Hence, this research aims to identify the causes of accidents and the ways to prevent accidents that occur at high-rise building construction site. Qualitative method was employed in this research. Interview surveying with safety officers who are involved in highrise building project in Kuala Lumpur were conducted in this research. Accidents were caused by man-made factors, environment factors or machinery factors. The accidents prevention methods were provide sufficient Personal Protective Equipment (PPE, have a good housekeeping, execute safety inspection, provide safety training and execute accidents investigation. In the meanwhile, interviewees have suggested the new prevention methods that were develop a proper site layout planning and de-merit and merit system among sub-contractors, suppliers and even employees regarding safety at workplace matters. This research helps in explaining the causes of accidents and identifying area where prevention action should be implemented, so that workers and top management will increase awareness in preventing site accidents.

  6. Fiber Reinforced Concrete (FRC) for High Rise Construction: Case Studies

    Science.gov (United States)

    Gharehbaghi, Koorosh; Chenery, Rhea

    2017-12-01

    Due to its material element, Fiber Reinforced Concrete (FRC) could be stronger than traditional Concrete. This is due to FRC internal material compounds and elements. Furthermore, FRC can also significantly improve flexural strength when compared to traditional Concrete. This improvement in flexural strength can be varied depending on the actual fibers used. Although not new, FRC is gradually gaining popularity in the construction industry, in particular for high rise structures. This is due to its flexural strength, especially for high seismic zones, as it will provide a better solution then reinforced Concrete. The main aim of this paper is to investigate the structural importance of FRC for the high rise construction. Although there has been numerous studies and literature in justifying the FRC for general construction; this paper will consider its use specifically for high rise construction. Moreover, this paper will closely investigate eight case studies from Australian and United States as a part of the FRC validation for high rise construction. In doing so, this paper will examine their Structural Health Monitoring (SHM) to determine their overall structural performance.

  7. High and rising health care costs.

    Science.gov (United States)

    Ginsburg, Paul B

    2008-10-01

    The U.S. is spending a growing share of the GDP on health care, outpacing other industrialized countries. This synthesis examines why costs are higher in the U.S. and what is driving their growth. Key findings include: health care inefficiency, medical technology and health status (particularly obesity) are the primary drivers of rising U.S. health care costs. Health payer systems that reward inefficiencies and preempt competition have impeded productivity gains in the health care sector. The best evidence indicates medical technology accounts for one-half to two-thirds of spending growth. While medical malpractice insurance and defensive medicine contribute to health costs, they are not large enough factors to significantly contribute to a rise in spending. Research is consistent that demographics will not be a significant factor in driving spending despite the aging baby boomers.

  8. Use of formwork systems in high-rise construction

    Science.gov (United States)

    Kurakova, Oksana

    2018-03-01

    Erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization. The main material used in high-rise construction is insitu reinforced concrete. The technology of its use is directly related to the use of formwork systems. Formwork systems and formwork technologies basically determine the speed of construction and labor intensity of concreting operations. Therefore, it is also possible to achieve the goal of reducing the construction time and labor intensity of works performed by improving the technology of formwork systems use. Currently there are unresolved issues in the area of implementation of monolithic technology projects, and problems related to the selection of a formwork technology, high labor intensity of works, poor quality of materials and structures, etc. are the main ones. The article presents organizational and technological measures, by means of which introduction it is possible to shorten the duration of construction. A comparison of operations performed during formwork installation according to the conventional technology and taking into account the implemented organizational and technological measures is presented. The results of a comparative analysis of economic efficiency assessments are also presented on the example of a specific construction project before and after the implementation of the above mentioned measures. The study showed that introduction of the proposed organizational and technological model taking into account optimization of reinforcing and concreting works significantly improves the efficiency of a high-rise construction project. And further improvement of technologies for the use of insitu reinforced concrete is a promising direction in the construction of high-rise buildings.

  9. Use of formwork systems in high-rise construction

    Directory of Open Access Journals (Sweden)

    Kurakova Oksana

    2018-01-01

    Full Text Available Erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization. The main material used in high-rise construction is insitu reinforced concrete. The technology of its use is directly related to the use of formwork systems. Formwork systems and formwork technologies basically determine the speed of construction and labor intensity of concreting operations. Therefore, it is also possible to achieve the goal of reducing the construction time and labor intensity of works performed by improving the technology of formwork systems use. Currently there are unresolved issues in the area of implementation of monolithic technology projects, and problems related to the selection of a formwork technology, high labor intensity of works, poor quality of materials and structures, etc. are the main ones. The article presents organizational and technological measures, by means of which introduction it is possible to shorten the duration of construction. A comparison of operations performed during formwork installation according to the conventional technology and taking into account the implemented organizational and technological measures is presented. The results of a comparative analysis of economic efficiency assessments are also presented on the example of a specific construction project before and after the implementation of the above mentioned measures. The study showed that introduction of the proposed organizational and technological model taking into account optimization of reinforcing and concreting works significantly improves the efficiency of a high-rise construction project. And further improvement of technologies for the use of insitu reinforced concrete is a promising direction in the construction of high-rise buildings.

  10. Methodology for determining the investment attractiveness of construction of high-rise buildings

    Science.gov (United States)

    Nezhnikova, Ekaterina; Kashirin, Valentin; Davydova, Yana; Kazakova, Svetlana

    2018-03-01

    The article presents the analysis of the existing methods for assessing the investment attractiveness of high-rise construction. The authors determined and justified the primary choice of objects and territories that are the most attractive for the development of high-rise construction. A system of risk indicators has been developed that allow making a quantitative adjustment for a particular project in the evaluation of the efficiency of investment projects. The study is aimed at developing basic methodological concepts for a comparative evaluation of the prospects of construction of high-rise facilities that allow to take into consideration the features of investment in construction and to enable quantitative evaluation of the investment effectiveness in high-rise construction.

  11. The problems and perspectives for the introduction of high-rise construction in Russian cities

    Science.gov (United States)

    Pershina, Anna; Radzhabov, Mehman; Dormidontova, Tatyana

    2018-03-01

    The propose of academic affairs is discovery the principal areas of concern high-rise construction in Russia. Examples of modern Russian and foreign high-rise construction are considered in the work. The most important problems and their solutions for Russia are identified on their basis. The everyone area of concern is considered separately. Ecology problems and influence of high-rise construction for the healthy and psychological effect of people are considered special. High-rise constructions influence negative and positive for urban environment in Moscow and Samara cities. The experience lack, defects in requirements document, which don't include all high-rise constructions specific, system problem of construction and often non-availability of proper control at the existing requirements document result for complexity of designing, construction and operation. At this moment, high-rise constructions temp is increasing in Moscow. Feasibility of high-rise buildings come up in regions of Russia. The reasons include high material inputs, irregularities of requirements network and utility lines and maintenance problems. The researching follow up of conclusions and recommendations for high-rise constructions development in Russia. The reasons of high-rise buildings are urbanization of people and necessary of concentration labor supply. The important tasks for organization are creating compact urban environment, decrease urban area for development, using an innovative technology for construction and properly maintenance. The balance between the preference of high-rise construction, inputs for construction and influence for ecology are resolve for this task.

  12. Partitions for high-rise construction using phosphogypsum

    Science.gov (United States)

    Zolotukhin, Sergey; Kukina, Olga; Abramenko, Anatoly

    2018-03-01

    Gypsum blocks are usually used to make partitions in highrise construction. Reducing the cost of materials used in high-rise construction is an urgent task of modern material science. Phosphogypsum dihydrate, which has binding properties, is one of the large-tonnage waste. The authors have proved that, after years of storage in heaps, water-soluble phosphates, fluorides and other additives included in the structure of fresh phosphogypsum dissolved in water due to weathering (humidification-drying, freezing-thawing in a water-saturated state), and the calcium hydro-and dihydrogen phosphates ingressed in the lattice underwent complete hydrolysis and disintegration, thereby changing the physicochemical properties of phosphogypsum. The data obtained by the authors on the absence of water-soluble compounds of phosphorus, fluorine in stale phosphogypsum indicate its ecological purity and the possibility of application in housing construction. Having analyzed the data of modern methods of differential scanning calorimetry and scanning electron microscopy, the authors predicted and proved by the energy of dehydration of phosphogypsum dihydrate, lime, sandy loam, the possibility of obtaining non-flammable materials with sufficient strength for wall materials. Understanding the processes occurring in water films (the thickness of the water film, the pressure, the temperature and the pH of the aqueous extract of the mixture, the drying of the materials produced), made it possible to develop a technology for obtaining wall products from lime-sandy phosphogypsum material using typical silicate brick production equipment and vibropresses for key-cog blocks production.

  13. Partitions for high-rise construction using phosphogypsum

    Directory of Open Access Journals (Sweden)

    Zolotukhin Sergey

    2018-01-01

    Full Text Available Gypsum blocks are usually used to make partitions in highrise construction. Reducing the cost of materials used in high-rise construction is an urgent task of modern material science. Phosphogypsum dihydrate, which has binding properties, is one of the large-tonnage waste. The authors have proved that, after years of storage in heaps, water-soluble phosphates, fluorides and other additives included in the structure of fresh phosphogypsum dissolved in water due to weathering (humidification-drying, freezing-thawing in a water-saturated state, and the calcium hydro-and dihydrogen phosphates ingressed in the lattice underwent complete hydrolysis and disintegration, thereby changing the physicochemical properties of phosphogypsum. The data obtained by the authors on the absence of water-soluble compounds of phosphorus, fluorine in stale phosphogypsum indicate its ecological purity and the possibility of application in housing construction. Having analyzed the data of modern methods of differential scanning calorimetry and scanning electron microscopy, the authors predicted and proved by the energy of dehydration of phosphogypsum dihydrate, lime, sandy loam, the possibility of obtaining non-flammable materials with sufficient strength for wall materials. Understanding the processes occurring in water films (the thickness of the water film, the pressure, the temperature and the pH of the aqueous extract of the mixture, the drying of the materials produced, made it possible to develop a technology for obtaining wall products from lime-sandy phosphogypsum material using typical silicate brick production equipment and vibropresses for key-cog blocks production.

  14. REGULARITIES OF THE INFLUENCE OF ORGANIZATIONAL AND TECHNOLOGICAL FACTORS ON THE DURATION OF CONSTRUCTION OF HIGH-RISE MULTIFUNCTIONAL COMPLEXES

    Directory of Open Access Journals (Sweden)

    ZAIATS Yi. I.

    2015-10-01

    Full Text Available Problem statement. Technical and economic indexes of projects of construction of high-rise multifunctional complexes, namely: the duration of construction works and the cost of building products depends on the technology of construction works and method of construction organization, and on their choice influence the architectural and design, constructional and engineering made decisions. Purpose. To reveal the regularity of influence of organizational and technological factors on the duration of construction of high-rise multifunctional complexes in the conditions of dense city building. Conclusion. To reveal the regularity of the influence of organizational and technological factors (the height, the factor complexity of design of project and and estimate documentation, factor of complexity of construction works, the factor of complexity of control of investment and construction project, economy factor, comfort factor, factor of technology of projected solutions for the duration of the construction of high-rise multifunctional complexes (depending on their height: from 73,5 m to 100 m inclusively; from 100 m to 200 m inclusively allow us to quantitatively assess their influence and can be used in the development of the methodology of substantiation of the expediency and effectiveness of the realization of projects of high-rise construction in condition of compacted urban development, based on the consideration of the influence of organizational and technological aspects.

  15. High-rise construction in the Russian economy: modeling of management decisions

    Science.gov (United States)

    Miroshnikova, Tatyana; Taskaeva, Natalia

    2018-03-01

    The growth in the building industry, particularly in residential high-rise construction, is having considerable influence on the country's economic development. The scientific hypothesis of the research is that the execution of town-planning programs of high-rise construction depends to a large extent on the management of the provision of material resources for the construction of a millionth city, while the balance model is the most important tool for establishing and determining the ratio between supply and demand for material resources. In order to improve the efficiency of high-rise building management, it is proposed to develop a methodology for managing the provision of construction of large cities with material resources.

  16. IT Requirements Integration in High-Rise Construction Design Projects

    Science.gov (United States)

    Levina, Anastasia; Ilin, Igor; Esedulaev, Rustam

    2018-03-01

    The paper discusses the growing role of IT support for the operation of modern high-rise buildings, due to the complexity of managing engineering systems of buildings and the requirements of consumers for the IT infrastructure. The existing regulatory framework for the development of design documentation for construction, including high-rise buildings, is analyzed, and the lack of coherence in the development of this documentation with the requirements for the creation of an automated management system and the corresponding IT infrastructure is stated. The lack of integration between these areas is the cause of delays and inefficiencies both at the design stage and at the stage of putting the building into operation. The paper proposes an approach to coordinate the requirements of the IT infrastructure of high-rise buildings and design documentation for construction. The solution to this problem is possible within the framework of the enterprise architecture concept by coordinating the requirements of the IT and technological layers at the design stage of the construction.

  17. Field monitoring of column shortenings in a high-rise building during construction.

    Science.gov (United States)

    Choi, Se Woon; Kim, Yousok; Kim, Jong Moon; Park, Hyo Seon

    2013-10-24

    The automatic monitoring of shortenings of vertical members in high-rise buildings under construction is a challenging issue in the high-rise building construction field. In this study, a practical system for monitoring column shortening in a high-rise building under construction is presented. The proposed monitoring system comprises the following components: (1) a wireless sensing system and (2) the corresponding monitoring software. The wireless sensing system comprises the sensors and energy-efficient wireless sensing units (sensor nodes, master nodes, and repeater nodes), which automate the processes for measuring the strains of vertical members and transmitting the measured data to the remote server. The monitoring software enables construction administrators to monitor real-time data collected by the server via an Internet connection. The proposed monitoring system is applied to actual 66-floor and 72-floor high-rise buildings under construction. The system enables automatic and real-time measurements of the shortening of vertical members, which can result in more precise construction.

  18. Methodical approaches to value assessment and determination of the capitalization level of high-rise construction

    Science.gov (United States)

    Smirnov, Vitaly; Dashkov, Leonid; Gorshkov, Roman; Burova, Olga; Romanova, Alina

    2018-03-01

    The article presents the analysis of the methodological approaches to cost estimation and determination of the capitalization level of high-rise construction objects. Factors determining the value of real estate were considered, three main approaches for estimating the value of real estate objects are given. The main methods of capitalization estimation were analyzed, the most reasonable method for determining the level of capitalization of high-rise buildings was proposed. In order to increase the value of real estate objects, the author proposes measures that enable to increase significantly the capitalization of the enterprise through more efficient use of intangible assets and goodwill.

  19. High-rise construction in historical cities through the example of Saint Petersburg

    Science.gov (United States)

    Granstrem, Maria; Zolotareva, Milena; Slavina, Tatyana

    2018-03-01

    The article sets forth results of the landscape visual analysis of the interaction of high-rise construction facilities with the environment of historical urban spaces. A toxic connection of high-rise construction facilities with the established urban landscape was analyzed and recorded. One of the latest stages of the reconstruction of historical cities, which penetrated many European countries at the end of the 20th century, also started in the beginning of the 21st century in Russia, where the reconstruction of historical facilities and territories became one of the leading trends of architectural activity. Therefore, problems of the interaction between the old city and new high-rise construction nearby historical centers are extremely relevant for Russian architects. Specific features of Russian high-rise construction within visual borders of historical cities, developed at the turn of the 20th-21st centuries, repeat past urban-planning mistakes spread in Europe in the second half of the 20th century. High-rise construction in close proximity to historical centers of cities violates an established scale and destroys a historical city silhouette.

  20. Integrating conservation costs into sea level rise adaptive conservation prioritization

    Directory of Open Access Journals (Sweden)

    Mingjian Zhu

    2015-07-01

    Full Text Available Biodiversity conservation requires strategic investment as resources for conservation are often limited. As sea level rises, it is important and necessary to consider both sea level rise and costs in conservation decision making. In this study, we consider costs of conservation in an integrated modeling process that incorporates a geomorphological model (SLAMM, species habitat models, and conservation prioritization (Zonation to identify conservation priorities in the face of landscape dynamics due to sea level rise in the Matanzas River basin of northeast Florida. Compared to conservation priorities that do not consider land costs in the analysis process, conservation priorities that consider costs in the planning process change significantly. The comparison demonstrates that some areas with high conservation values might be identified as lower priorities when integrating economic costs in the planning process and some areas with low conservation values might be identified as high priorities when considering costs in the planning process. This research could help coastal resources managers make informed decisions about where and how to allocate conservation resources more wisely to facilitate biodiversity adaptation to sea level rise.

  1. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  2. Analysis of administrative barriers in the industry of the high-rise construction in Russian Federation

    Science.gov (United States)

    Zaychenko, Irina; Borremans, Alexandra; Gutman, Svetlana

    2018-03-01

    The article describes the concept and types of administrative barriers encountered in various areas of the enterprise. The particularities of the Russian high-rise construction industry are described and a comparative analysis of administrative barriers in this sector is performed. The main stages and administrative procedures when the developers implement investment and construction projects in the field of high-rise construction are determined. The regulatory and legal framework for the implementation of investment and project activities in the high-rise construction industry has been studied and conclusions have been drawn on its low level of precision in the issue of the formation of competitive and efficient high-rise construction markets. The average number of administrative procedures for the implementation of the investment and construction project in the field of high-rise construction is determined. The factors preventing the reduction of administrative barriers in the high-rise construction industry are revealed.

  3. Construction waste rises up the agenda.

    Science.gov (United States)

    Moon, David

    2010-10-01

    Building maintenance and the construction of new healthcare facilities are central to maintaining the NHS's infrastructure, but such work is costly, and subject to intense financial scrutiny. Dr David Moon, programme manager, Clients and Policy, at Government-backed WRAP (the Waste & Resources Action Programme), which works in England, Scotland, Wales, and Northern Ireland, to help businesses and individuals reduce waste, develop sustainable products, and use resources efficiently, outlines the crucial role that NHS Trusts play in securing cost savings through minimising construction waste, as set out in a new WRAP guide.

  4. Construction of high-rise building with underground parking in Moscow

    Directory of Open Access Journals (Sweden)

    Ilyichev Vyacheslav

    2018-01-01

    Full Text Available Paper presents results of scientific support to construction of unique residential building 108 m high with one storey underground part under high-rise section and 3-storey underground parking connected by underground passage. On-site soils included anthropogenic soil, clayey soils soft-stiff, saturated sands of varied grain coarseness. Design of retaining structure and support system for high-rise part excavation was developed. It suggested installation of steel pipes and struts. Construction of adjacent 3-storey underground parking by “Moscow method” is described in the paper. This method involves implementation of retaining wall consisted of prefabricated panels, truss structures (used as struts and reinforced concrete slabs. Also design and construction technology is provided for foundations consisted of bored piles 800 MM in diameter joined by slab with base widening diameter of 1500 MM. Experiment results of static and dynamic load testing (ELDY method are considered. Geotechnical monitoring data of adjacent building and utility systems settlement caused by construction of presented high-rise building were compared to numerical modelling results, predicted and permissible values.

  5. Construction of high-rise building with underground parking in Moscow

    Science.gov (United States)

    Ilyichev, Vyacheslav; Nikiforova, Nadezhda; Konnov, Artem

    2018-03-01

    Paper presents results of scientific support to construction of unique residential building 108 m high with one storey underground part under high-rise section and 3-storey underground parking connected by underground passage. On-site soils included anthropogenic soil, clayey soils soft-stiff, saturated sands of varied grain coarseness. Design of retaining structure and support system for high-rise part excavation was developed. It suggested installation of steel pipes and struts. Construction of adjacent 3-storey underground parking by "Moscow method" is described in the paper. This method involves implementation of retaining wall consisted of prefabricated panels, truss structures (used as struts) and reinforced concrete slabs. Also design and construction technology is provided for foundations consisted of bored piles 800 MM in diameter joined by slab with base widening diameter of 1500 MM. Experiment results of static and dynamic load testing (ELDY method) are considered. Geotechnical monitoring data of adjacent building and utility systems settlement caused by construction of presented high-rise building were compared to numerical modelling results, predicted and permissible values.

  6. 4D modeling in high-rise construction

    Science.gov (United States)

    Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly

    2018-03-01

    High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  7. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  8. Global cost analysis on adaptation to sea level rise based on RCP/SSP scenarios

    Science.gov (United States)

    Kumano, N.; Tamura, M.; Yotsukuri, M.; Kuwahara, Y.; Yokoki, H.

    2017-12-01

    Low-lying areas are the most vulnerable to sea level rise (SLR) due to climate change in the future. In order to adapt to SLR, it is necessary to decide whether to retreat from vulnerable areas or to install dykes to protect them from inundation. Therefore, cost- analysis of adaptation using coastal dykes is one of the most essential issues in the context of climate change and its countermeasures. However, few studies have globally evaluated the future costs of adaptation in coastal areas. This study tries to globally analyze the cost of adaptation in coastal areas. First, global distributions of projected inundation impacts induced by SLR including astronomical high tide were assessed. Economic damage was estimated on the basis of the econometric relationship between past hydrological disasters, affected population, and per capita GDP using CRED's EM-DAT database. Second, the cost of adaptation was also determined using the cost database and future scenarios. The authors have built a cost database for installed coastal dykes worldwide and applied it to estimating the future cost of adaptation. The unit costs of dyke construction will increase with socio-economic scenario (SSP) such as per capita GDP. Length of vulnerable coastline is calculated by identifying inundation areas using ETOPO1. Future cost was obtained by multiplying the length of vulnerable coastline and the unit cost of dyke construction. Third, the effectiveness of dyke construction was estimated by comparing cases with and without adaptation.As a result, it was found that incremental adaptation cost is lower than economic damage in the cases of SSP1 and SSP3 under RCP scenario, while the cost of adaptation depends on the durability of the coastal dykes.

  9. Normative and economic foundations of high-rise construction in the city of Samara

    Science.gov (United States)

    Didkovskaya, Olga V.; Bocharov, Aleksey Y.; Ilyina, Marina V.; Mamaeva, Olga A.

    2018-03-01

    Every year the number of free land plots for construction of buildings is steadily decreasing in cities. In this regard, the participants in the investment and construction process are increasingly seeking to maximize the use of land. A logical way for this is to use high-rise construction. However, until recently, builders encountered serious obstacles in the form of lack of special norms and rules for the design of high-rise buildings. It led to the need for individual coordination of each high-rise facility, the development and approval of special technical conditions, the passage of numerous administrative approvals. Thus, investment activity regarding the construction of high-rise buildings in the Russian Federation is reduced. In 2016, there were regulatory changes that substantially alleviated these difficulties. In this article, the authors analyze the features of the town-planning normative-legal field of high-rise construction and its development, track the interrelations between the regulatory regulation of the construction of similar facilities, with the real need, the technical feasibility and economic feasibility of their construction in the urban district of Samara. Conclusions and suggestions are also based on the analysis of the norms of urban zoning, the residential real estate market and the value of land plots.

  10. Measures to reduce construction time of high-rise buildings

    Science.gov (United States)

    Kolchedantsev, Leonid; Adamtsevich, Aleksey; Stupakova, Olga; Drozdov, Alexander

    2018-03-01

    The organizational and technological solutions for high-rise buildings construction efficiency increase are considered, primarily - decrease of typical floor construction time and improvement of bearing structures concrete quality. The essence of offered technology is: a concrete mixing station and a polygon mainly for load-bearing wall panels with starter bars casting are located on the building site; for reinforced concrete components manufacturing and butt joints grouting the warmed-up concrete mixtures are used. The results of researches and elaborations carried out by the SPSUACE in area of a preliminary warming-up of concrete mixtures are presented. The possibility and feasibility of their usage in high-rise buildings and of excess height buildings construction including cast-in-place and precast execution are shown. The essence of heat-vibro treating of concrete mixture is revealed as a kind of prior electroresistive curing, and the achieved results are: accelerated concrete strength gain, power inputs decrease, concrete quality improvement. It is shown that the location of a concrete mixing station on the building site enables to broaden possibilities of the "thermos" method use and to avoid concrete mixtures warming up in medium-mass structures erection (columns, girders) during the high-rise buildings construction. It is experimentally proved that the splice between precast elements encased with warmed-up concrete mixture is equal with conjugated elements in strength.

  11. Nuclear costs: why do they keep rising?

    International Nuclear Information System (INIS)

    MacKerron, Gordon

    1992-01-01

    Nuclear power has performed badly in recent years as a new investment everywhere except Japan and Korea. This has mainly been for orthodox financial and economic reasons. Among the factors contributing to this loss of competitiveness, persistently rising real capital costs have been particularly important. While the nuclear industry has believed it could control and reduce capital costs, increasing regulatory stringency has made designs more complex and correspondingly more costly. These cost increasing factors have far outweighed traditional cost reducing factors (like learning). The only lasting way to meet increasing stringency in safety at acceptably low cost is likely to be the development of new and simpler reactor designs. (author)

  12. 4D modeling in high-rise construction

    Directory of Open Access Journals (Sweden)

    Balakina Anastasiya

    2018-01-01

    Full Text Available High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  13. Economic justification of costs at inspection of industrial safety of high-rise marine structures

    Science.gov (United States)

    Garibin, Pavel; Ol'khovik, Evgeniy; Rastorguev, Igor

    2018-03-01

    The task of technical and economic regulation within mutual international recognition of testing laboratories are considered. Codes and procedures within requirements of international ISO/IEC standards of a series 17000 for elimination of non-tariff barriers and interlaboratory exchange of experts in the field of high-rise marine construction are considered. In paper, the methods of assessment of formation of economically justified cost of works at inspection and monitoring of technical condition of high-rise marine wharf engineering port structure based on settlement and actual labor input were applied. For the countries of EU, data on the average cost of works of testing laboratory within a week have been taken as a basis. Such approach will be objective as considers only expenses on obligatory actions in the course of inspection of technical condition of port engineering constructions. The analysis of public results of financial activities of the accredited organizations allowed to calculate the main indicators of the size of necessary profit and overheads at observance of all requirements imposed to test laboratories including taking into account their future technical development. The offered practice corresponds to the general direction by mutual international recognition of independent testing laboratories and can be use in the future.

  14. Non-price competition in the regional high-rise construction market

    Directory of Open Access Journals (Sweden)

    Ganebnykh Elena

    2018-01-01

    Full Text Available The article analyzes the market of high-rise residential construction in the city of Kirov (Russia. A minimal significance of price factors has been revealed in the process of the market analysis. This suggests that a lower price does not guarantee an increase in consumer demand. Thus, factors of non-price competition are of great importance in the market in question. The expert survey has identified the factors of non-price competition which influence consumer perceptions. A perceptual map has been constructed on the basis of the identified factors by means of the factor analysis to determine the positioning of each high-rise building relative to the consumer requirements. None of the high-rise residential buildings in the market in question meets the consumers’ expectations of an “ideal facility”.

  15. Non-price competition in the regional high-rise construction market

    Science.gov (United States)

    Ganebnykh, Elena; Burtseva, Tatyana; Gurova, Ekaterina; Polyakova, Irina

    2018-03-01

    The article analyzes the market of high-rise residential construction in the city of Kirov (Russia). A minimal significance of price factors has been revealed in the process of the market analysis. This suggests that a lower price does not guarantee an increase in consumer demand. Thus, factors of non-price competition are of great importance in the market in question. The expert survey has identified the factors of non-price competition which influence consumer perceptions. A perceptual map has been constructed on the basis of the identified factors by means of the factor analysis to determine the positioning of each high-rise building relative to the consumer requirements. None of the high-rise residential buildings in the market in question meets the consumers' expectations of an "ideal facility".

  16. 25 CFR 700.467 - Construction costs.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...

  17. Technological features of installation of transformable low-rise buildings from sandwich panels

    Directory of Open Access Journals (Sweden)

    Pleshivtsev Aleksandr Aleksandrovich

    2018-04-01

    Full Text Available Subject of research: organizational and technological solutions are considered in the construction of transformable low-rise residential buildings using sandwich panels. Aims: rational choice of organizational and technological solutions for the rhythmic construction of the underground and above-ground part of the transformable low-rise buildings in order to reduce labor costs and construction time. Materials and methods: methods of computer modeling of the technological processes are used to determine the duration of the construction of the low-rise buildings. Results: rational methods for erecting a complex of transformable low-rise buildings are defined, parameters of technological processes are established, an analysis of technological operations is provided for the construction of transformable low-rise residential buildings using sandwich panels. Conclusions: now organizational and technological solutions for the construction of transformable low-rise residential buildings with the use of sandwich panels reduce labour costs, increase the construction pace and as well as the using of improved technological processes in the construction of such buildings leads to a reduction in construction time.

  18. Modelling of energy consumption at construction of high-rise buildings

    Directory of Open Access Journals (Sweden)

    Korol Elena

    2018-01-01

    Full Text Available High-rise building structures in the course of its erection suppose primary use of methods provided for erection, concrete and external finishing works. Erection works do not differ significantly from usual ones: traditional equipment, accessories and techniques are used which are based on erection of structures in project position using a crane. Structures to be assembled in building frame include steel columns and beams, wall panels, form elements of columns, walls and floor structures. We can note heightened attention to operational control for quality of erection, but it is attributable to all works in the course of high-rise construction. During high-rise erection by means of cast in-situ reinforced concrete all formworks to be used do not have any special differences except systems specially designed for high-rise erection using sliding formwork or vertical traveling forms. In these systems special attention is paid to safety of elevated works. Working methods of placement and curing of concrete and structures as a whole remain traditional – the requirements for controlling such operations become toughened. The most evident differences in high-rise erection with regard to equipment, machinery and accessories used are in means provided for load transportation and safety of works at heights. Particularity of internal finishing works which are also obligatory during construction of skyscrapers allows not considering them in as technological differences from usual construction as far as the «height» of its execution is limited by height of particular floor and determined by price and building class.

  19. Modelling of energy consumption at construction of high-rise buildings

    Science.gov (United States)

    Korol, Elena; Korol, Oleg

    2018-03-01

    High-rise building structures in the course of its erection suppose primary use of methods provided for erection, concrete and external finishing works. Erection works do not differ significantly from usual ones: traditional equipment, accessories and techniques are used which are based on erection of structures in project position using a crane. Structures to be assembled in building frame include steel columns and beams, wall panels, form elements of columns, walls and floor structures. We can note heightened attention to operational control for quality of erection, but it is attributable to all works in the course of high-rise construction. During high-rise erection by means of cast in-situ reinforced concrete all formworks to be used do not have any special differences except systems specially designed for high-rise erection using sliding formwork or vertical traveling forms. In these systems special attention is paid to safety of elevated works. Working methods of placement and curing of concrete and structures as a whole remain traditional - the requirements for controlling such operations become toughened. The most evident differences in high-rise erection with regard to equipment, machinery and accessories used are in means provided for load transportation and safety of works at heights. Particularity of internal finishing works which are also obligatory during construction of skyscrapers allows not considering them in as technological differences from usual construction as far as the «height» of its execution is limited by height of particular floor and determined by price and building class.

  20. INFORMATION MODELING OF LIFE CYCLE OF HIGH-RISE CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2018-02-01

    Full Text Available To date, many years’ experience in the construction and operation of high-rise buildings has been accumulated. Its analysis reveals not only the engineering and organizational-technological specifics of such projects, but also systemic gaps in the field of management. In the implementation of large-scale and unique projects for high-rise buildings, the problems and tasks of improving approaches to managing the full life cycle of projects and methods, which will improve their competitiveness, become topical. The systems being used have largely exhausted their resource efficiency, which is associated with automation of traditional “inherited” processes and management structures, as well as development of IT-systems focused on digitalization of the activities of construction company, rather than the project. To solve these problems, it is proposed to carry out: reengineering of the schemes of information interaction between the project’s participants; formation of integrated digital environment for the life cycle of the project; development of systems for integrating data management and project management. Subject: problems, approaches and methods of digitalization of project’s life cycle management in relation to the specifics and features of high-rise buildings. Research objectives: substantiation of the most perspective approaches and methods of information modeling of high-rise construction as the basis for managing the full life cycle of the given project. Materials and methods: the experience of digitalization of design, construction, operation and development of high-rise buildings, presented in specialized literature, is analyzed. The methods for integrating information models of various stages of project’s life cycle and for information interaction of project’s participants are considered. Results: the concept of forming a single digital environment for the project is proposed, taking into account the features of the life

  1. Construction costs of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Mandel, H

    1976-03-01

    It is assumed that the demand for electrical energy will continue to rise and that nuclear power will increasingly supply the base-load of electricity generation in the industrialized world. The author identifies areas where techniques and practices to control costs can be improved. Nuclear power offers an alternative to liquid and gaseous fossil fuels and contributes to a relative stability in the price of electric energy. Nuclear power plants can now generate power more cheaply than other thermal power plants down into the upper middle load sector, as indicated in calculations based on a construction time of six years for nuclear plants and four years for others. Special legal provisions, different conditions of financing and taxation, varying methods of power generation cost accounting, and the nonuniform layout of the plant in the various countries make it difficult to compare power generation costs. The author uses mostly experiences gained in the Federal Republic of Germany for some calculations for comparison; he cites lack of standardization and over-long licensing times as major factors in the recent rapid escalation of nuclear power costs and suggests that adoption of standard reactor designs, encouragement of a vigorous and competitive European nuclear industry, and streamlining of licensing procedures to improve the situation. (MCW)

  2. Economic efficiency of application of innovative materials and structures in high-rise construction

    Science.gov (United States)

    Golov, Roman; Dikareva, Varvara; Gorshkov, Roman; Agarkov, Anatoly

    2018-03-01

    The article is devoted to the analysis of technical and economic efficiency of application of tube confined concrete structures in high-rise construction. The study of comparative costs of materials with the use of different supporting columns was carried out. The main design, operational, technological and economic advantages of the tube confined concrete technology were evaluated, conclusions were drawn about the high strength and deformation properties of axial compression of steel tubes filled with high-strength concrete. The efficiency of the tube confined concrete use is substantiated, which depends mainly on the scale factor and percentage of reinforcement affecting its load-bearing capacity.

  3. High-rise construction as a method for architectural development of megapolises

    Science.gov (United States)

    Kankhva, Vadim

    2018-03-01

    The article analyzes the current state of urban development in Moscow, there are revealed the insights into pattern of large investment projects. The regulatory framework as well as the state and the forecast of housing funds are scrutinized. A number of problems, that are related to the implementation of high-rise construction projects at all stages of the life cycles, are highlighted by the example of unique facilities, which are under construction or have already been built. Substantiation of high-rise construction by the transport hubs in megapolises is given. There are also considered main advantages of Moscow renovation project and criticism against it.

  4. Construction and operation costs of constructed wetlands treating wastewater.

    Science.gov (United States)

    Gkika, Dimitra; Gikas, Georgios D; Tsihrintzis, Vassilios A

    2014-01-01

    Design data from nine constructed wetlands (CW) facilities of various capacities (population equivalent (PE)) are used to estimate construction and operation costs, and then to derive empirical equations relating the required facility land area and the construction cost to PE. In addition, comparisons between the costs of CW facilities based on various alternative construction materials, i.e., reinforced concrete and earth structures (covered with either high density polyethylene or clay), are presented in relation to the required area. The results show that earth structures are economically advantageous. The derived equations can be used for providing a preliminary cost estimate of CW facilities for domestic wastewater treatment.

  5. The Global Experience of Deployment of Energy-Efficient Technologies in High-Rise Construction

    Science.gov (United States)

    Potienko, Natalia D.; Kuznetsova, Anna A.; Solyakova, Darya N.; Klyueva, Yulia E.

    2018-03-01

    The objective of this research is to examine issues related to the increasing importance of energy-efficient technologies in high-rise construction. The aim of the paper is to investigate modern approaches to building design that involve implementation of various energy-saving technologies in diverse climates and at different structural levels, including the levels of urban development, functionality, planning, construction and engineering. The research methodology is based on the comprehensive analysis of the advanced global expertise in the design and construction of energy-efficient high-rise buildings, with the examination of their positive and negative features. The research also defines the basic principles of energy-efficient architecture. Besides, it draws parallels between the climate characteristics of countries that lead in the field of energy-efficient high-rise construction, on the one hand, and the climate in Russia, on the other, which makes it possible to use the vast experience of many countries, wholly or partially. The paper also gives an analytical review of the results arrived at by implementing energy efficiency principles into high-rise architecture. The study findings determine the impact of energy-efficient technologies on high-rise architecture and planning solutions. In conclusion, the research states that, apart from aesthetic and compositional interpretation of architectural forms, an architect nowadays has to address the task of finding a synthesis between technological and architectural solutions, which requires knowledge of advanced technologies. The study findings reveal that the implementation of modern energy-efficient technologies into high-rise construction is of immediate interest and is sure to bring long-term benefits.

  6. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  7. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  8. High-rise construction in the Saint Petersburg agglomeration in 1703-1950s

    Science.gov (United States)

    Sementsov, Sergey; Akulova, Nadezhda; Kurakina, Severina

    2018-03-01

    Regularities of high-rise construction (implemented projects and developments) in Saint Petersburg and the Saint Petersburg agglomeration since the foundation of the city in 1703 till the 1950s are considered. Based on these regularities, a single spatially developed system of vertical dominants is formed. High-rise construction in the city and its suburbs started in the 1710s and continues up to the present time. In the considered decades (1703-1950s), high-rise construction mostly performed urban-planning functions (with vertical and symbolic dominants), relying on patterns of the visual perception of man-made landscapes under development. Since the 1710s, the construction of vertical dominants (mainly temples, spires of towers, lighthouses, etc.) of five ranks (depending on the altitude range and in relation to the background development) was conducted in territories of the entire agglomeration. These dominants were arranged in landscapes of the city and suburbs with almost mathematically precise accuracy and according to special regulations. Such dominants obtained particular descriptive and silhouette characteristics in accordance with the conditions of spatial perception. In some periods of city development, attempts were made to create monuments (symbolic dominants) of specific height and include those in the spatial system of high-rise dominants as significant elements of the city silhouette.

  9. Cost Conscious: Incentive and Discount Programs Help Students Meet the Rising Cost of a Community College Education

    Science.gov (United States)

    Ullman, Ellen

    2013-01-01

    Aware that rising costs could force some community colleges to compromise their long-standing open-door policies, administrators have put in place programs and incentives to offset the higher price of the average community college education. This article features ideas and programs to help struggling community colleges cope with rising costs such…

  10. Sequential Construction of Costly Networks

    Energy Technology Data Exchange (ETDEWEB)

    Gutfraind, Alexander [Los Alamos National Laboratory

    2011-01-01

    Natural disasters or attacks often disrupt infrastructure networks requiring a costly recovery. This motivates an optimization problem where the objecitve is to construct the nodes of a graph G(V;E), and the cost of each node is dependent on the number of its neighbors previously constructed, or more generally, any properties of the previously-completed subgraph. In this optimization problem the objective is to find a permutation of the nodes which results in the least construction cost. We prove that in the case where the cost of nodes is a convex function in the number of neighbors, the optimal construction sequence is to start at a single node and move outwards. We also introduce algorithms and heuristics for solving various instances of the problem. Those methods can be applied to help reduce the cost of recovering from disasters as well as to plan the deployment of new network infrastructure.

  11. Insurance of risks as the instrument of protection of investments into high-rise construction

    Science.gov (United States)

    Vasilyeva, Elena; Okrepilov, Vladimir

    2018-03-01

    Insurance now is one of the important sectors for both world, and national financial systems. The mechanism of insurance of risks plays an essential role in the process of construction of high-rise buildings and as well as other unique objects. The author argues that insurance is categorically necessary because of the following reasons: huge scale and complexity of high-rise projects and great expenses, the use of unsafe sites for construction, great possible losses in case of the project, important role for the city infrastructure, numerous organizations, involved into the process of construction and maintenance, multypurpose use of the building. The features of insurance in the field of high-rise construction is also considered in the article. The prerequisites, confirming the loss occurrence are named.

  12. Design, construction and operation features of high-rise structures

    Science.gov (United States)

    Mylnik, Alexey; Mylnik, Vladimir; Zubeeva, Elena; Mukhamedzhanova, Olga

    2018-03-01

    The article considers design, construction and operation features of high-rise facilities. The analysis of various situations, that come from improper designing, construction and operation of unique facilities, is carried out. The integrated approach is suggested, when the problems of choosing acceptable constructional solutions related to the functional purpose, architectural solutions, methods of manufacturing and installation, operating conditions for unique buildings and structures are being tackled. A number of main causes for the emergency destruction of objects under construction and operation is considered. A number of measures are proposed on the basis of factor classification in order to efficiently prevent the situations, when various negative options of design loads and emergency impacts occur.

  13. Economic efficiency of high-rise construction in the Moscow program of renovation of housing stock

    Science.gov (United States)

    Misailovov, Andrey

    2018-03-01

    The article considers a new initiative of the regional authorities of updating the housing stock designated as the renovation of housing. Its main aspects are analyzed, including the nature of program, economic efficiency of its implementation due to high-rise construction and the regulatory and legislative framework, the procedure for implementing the program, and the time frame for its implementation. The role of the program for regions in which high depreciation of the housing stock is combined with a limited number of sites for a new housing construction is disclosed. The high-rise construction in the renovation program is presented as a variant of a successful solution not only of the tasks of renovating the housing stock, but also of filling the regional budget. The social and economic orientation of the high-rise construction and the involvement of residents in the process of making town-planning decisions in the field of high-rise construction at all stages of implementing the program are shown.

  14. CONSTRUCTION COST PREDICTION USING NEURAL NETWORKS

    Directory of Open Access Journals (Sweden)

    Smita K Magdum

    2017-10-01

    Full Text Available Construction cost prediction is important for construction firms to compete and grow in the industry. Accurate construction cost prediction in the early stage of project is important for project feasibility studies and successful completion. There are many factors that affect the cost prediction. This paper presents construction cost prediction as multiple regression model with cost of six materials as independent variables. The objective of this paper is to develop neural networks and multilayer perceptron based model for construction cost prediction. Different models of NN and MLP are developed with varying hidden layer size and hidden nodes. Four artificial neural network models and twelve multilayer perceptron models are compared. MLP and NN give better results than statistical regression method. As compared to NN, MLP works better on training dataset but fails on testing dataset. Five activation functions are tested to identify suitable function for the problem. ‘elu' transfer function gives better results than other transfer function.

  15. The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects

    Science.gov (United States)

    Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa

    2018-03-01

    The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.

  16. High-rise construction in the Saint Petersburg agglomeration in 1703–1950s

    Directory of Open Access Journals (Sweden)

    Sementsov Sergey

    2018-01-01

    Full Text Available Regularities of high-rise construction (implemented projects and developments in Saint Petersburg and the Saint Petersburg agglomeration since the foundation of the city in 1703 till the 1950s are considered. Based on these regularities, a single spatially developed system of vertical dominants is formed. High-rise construction in the city and its suburbs started in the 1710s and continues up to the present time. In the considered decades (1703–1950s, high-rise construction mostly performed urban-planning functions (with vertical and symbolic dominants, relying on patterns of the visual perception of man-made landscapes under development. Since the 1710s, the construction of vertical dominants (mainly temples, spires of towers, lighthouses, etc. of five ranks (depending on the altitude range and in relation to the background development was conducted in territories of the entire agglomeration. These dominants were arranged in landscapes of the city and suburbs with almost mathematically precise accuracy and according to special regulations. Such dominants obtained particular descriptive and silhouette characteristics in accordance with the conditions of spatial perception. In some periods of city development, attempts were made to create monuments (symbolic dominants of specific height and include those in the spatial system of high-rise dominants as significant elements of the city silhouette.

  17. Constructive systems, load-bearing and enclosing structures of high-rise buildings

    Science.gov (United States)

    Anatol'evna Korol', Elena; Olegovna Kustikova, Yuliya

    2018-03-01

    As the height of the building increases, loads on load-carrying structures increase dramatically, and as a result of the development of high-rise construction, several structural systems of such buildings have been developed: frame, frame-frame, cross-wall, barrel, box-type, box-to-wall ("pipe in pipe", "Trumpet in the farm"), etc. In turn, the barrel systems have their own versions: cantilever support of the ceilings on the trunk, suspension of the outer part of the overlap to the upper carrying console "hanging house" or its support by means of the walls on the lower bearing cantilever, intermediate position of the supporting cantilevers in height to the floor, from a part of floors. The object of the study are the structural solutions of high-rise buildings. The subject of the study is the layout of structural schemes of high-rise buildings, taking into account the main parameters - altitude (height), natural climatic conditions of construction, materials of structural elements and their physical and mechanical characteristics. The purpose of the study is to identify the features and systematization of structural systems of high-rise buildings and the corresponding structural elements. The results of the research make it possible, at the stage of making design decisions, to establish rational parameters for the correspondence between the structural systems of high-rise buildings and their individual elements.

  18. Quantity Surveying Undergraduates’ Awareness on Cost Significant of High-Rise Condominium Projects in Malaysia: The Case of a Private University in Malaysia

    OpenAIRE

    Peng Lee Wah; Seng Ng See; Choon Toh Tien; Sim Lim Cheng; Khian Yong Ching; Chen Goh Kai

    2016-01-01

    Recent developments in quantity surveying (QS) emphasised the importance of identifying cost significant elements (CSE). The knowledge on CSE of high-rise condominium projects (HRCP) is essential as high-rise residential multi-unit projects are the next option in building construction due to limited land areas in urban areas. This study aims to determine the levels of awareness among QS undergraduates of a private university in Malaysia on CSE of HRCP in Malaysia. The respondents’ knowledge o...

  19. High-rise housing construction as a way of solving the problem of providing people with comfortable habitation

    Science.gov (United States)

    Misailovov, Andrey

    2018-03-01

    The article analyzes the role of high-rise construction in solving the problem of providing people with comfortable habitation. High-rise construction is considered as a part of urban environment of big cities, a way of effective land use and development of entrepreneurship, including small and medium-sized enterprises. The economic efficiency of high-rise construction, an increase in budgetary financing and the number of introduced innovations are discussed.

  20. New plant construction cost and schedule

    International Nuclear Information System (INIS)

    Akins, M. J.

    2009-01-01

    The presentation covers the following topics: cost structure; capital costs; variation of capital costs; trends in power plant construction; studies of costs completion; periods and risks. Nuclear plant costs have recently risen so rapidly that vendors are not willing to publicly commit to cost estimates: ∼ $2000/Kw overnight costs in 2006 in the US market > $4000/Kw and in 2008 in the US market > $6000/Kw in 2008 in emerging markets. There is vendors pricing uncertainty. Current contract models may not apply. Current construction projects have problems: Olkiluoto-3 is reported to be 50% over budget and two years behind schedule, increasing perceptions that nuclear costs will continue to increase rapidly; Price of materials is a big volatile unknown, which may decrease Labor could become more available due to limited number of new projects; Lack of debt/credit to finance new project may decrease demand of new construction

  1. Construction Cost Management in Resource Based Economy

    OpenAIRE

    Elazzazy, Muhammad

    2017-01-01

    Resource Based Economy tested according to criteria formulated from the construction cost management best practices. A cost management plan modeled to demonstrate the possibility of construction management under a new socio-economic system, which counts the consumed natural resources by construction as the dry cost to the environment.

  2. The method of selecting an integrated development territory for the high-rise unique constructions

    Science.gov (United States)

    Sheina, Svetlana; Shevtsova, Elina; Sukhinin, Alexander; Priss, Elena

    2018-03-01

    On the basis of data provided by the Department of architecture and urban planning of the city of Rostov-on-don, the problem of the choice of the territory for complex development that will be in priority for the construction of high-rise and unique buildings is solved. The objective of the study was the development of a methodology for selection of the area and the implementation of the proposed method on the example of evaluation of four-territories complex development. The developed method along with standard indicators of complex evaluation considers additional indicators that assess the territory from the position of high-rise unique building. The final result of the study is the rankings of the functional priority areas that takes into account the construction of both residential and public and business objects of unique high-rise construction. The use of the developed methodology will allow investors and customers to assess the investment attractiveness of the future unique construction project on the proposed site.

  3. Population Aging in Iran and Rising Health Care Costs

    Directory of Open Access Journals (Sweden)

    Mohammad Mirzaie

    2017-09-01

    Conclusion Based on the results of this research, it can be said that people throughout their life cycle always allocate a percentage of their total spending to health care costs, but the percentage of this allocation is different at different ages. In a way the demand for healthcare costs increases with aging, it rises significantly in the old age. At the macro level, due to an increase in the percentage of elderly in the population over the next decade, there will also be an increase in the share of health care costs.

  4. Conversion of wastelands into state ownership for the needs of high-rise construction

    Science.gov (United States)

    Ganebnykh, Elena

    2018-03-01

    High-rise construction in big cities faces the problem of land shortage in downtown areas. Audit of economic complexes showed a large volume of wastelands. The conversion of wastelands into state and municipal ownership helps in part to solve the problem of the lack of space for high-rise construction in the urban area in the format of infill construction. The article investigates the problem of the conversion of wastelands into state and municipal ownership. The research revealed no clear algorithm for converting wastelands into state and municipal ownership. To form a unified system for identifying such plots, a universal algorithm was developed to identify and convert ownerless immovable property into state or municipal ownership.

  5. The effects of rising energy costs and transportation mode mix on forest fuel procurement costs

    International Nuclear Information System (INIS)

    Rauch, Peter; Gronalt, Manfred

    2011-01-01

    Since fossil fuels have been broadly recognized as a non-renewable energy source that threatens the climate, sustainable and CO 2 neutral energy sources - such as forest fuels - are being promoted in Europe, instead. With the expeditiously growing forest fuel demand, the strategic problem of how to design a cost-efficient distribution network has evolved. This paper presents an MILP model, comprising decisions on modes of transportation and spatial arrangement of terminals, in order to design a forest fuel supply network for Austria. The MILP model is used to evaluate the impacts of rising energy costs on procurement sources, transport mix and procurement costs on a national scale, based on the example of Austria. A 20% increase of energy costs results in a procurement cost increase of 7%, and another 20% increase of energy costs would have similar results. While domestic waterways become more important as a result of the first energy cost increase, rail only does so after the second. One way to decrease procurement costs would be to reduce the share of empty trips with truck and trailer. Reducing this share by 10% decreases the average procurement costs by up to 20%. Routing influences the modal split considerably, and the truck transport share increases from 86% to 97%, accordingly. Increasing forest fuel imports by large CHPs lowers domestic competition and also enables smaller plants to cut their procurement costs. Rising forest fuel imports via ship will not significantly decrease domestic market shares, but they will reduce procurement costs considerably. (author)

  6. Residential construction cost: An Italian survey.

    Science.gov (United States)

    Canesi, Rubina; Marella, Giuliano

    2017-04-01

    This paper reports data describing development projects for new buildings according to construction costs in North-East Italy. A survey was carried out on local companies undertaking new residential development projects in two Italian regions (Veneto and Lombardy). The aim of this survey was to record new real estate construction projects, collecting both technical and socio-economic cost features. It is extremely difficult to collect such data for the Italian real estate construction sector, due to its lack of transparency, so that the novelty for the Italian scenario is the dataset itself. Another interest perspective of this survey is that socio-economic characteristics were also recorded; they are often studied in urban economics, but are usually related to property purchase prices and values, not to construction costs. The data come from an analysis of Canesi and Marella regarding the relationship between the trend of construction costs and the socio-economic conditions of the reference setting, such as the mean years of schooling of the workforce, housing market trends, and average per capita income.

  7. Residential construction cost: An Italian survey

    Directory of Open Access Journals (Sweden)

    Rubina Canesi

    2017-04-01

    Full Text Available This paper reports data describing development projects for new buildings according to construction costs in North-East Italy. A survey was carried out on local companies undertaking new residential development projects in two Italian regions (Veneto and Lombardy. The aim of this survey was to record new real estate construction projects, collecting both technical and socio-economic cost features. It is extremely difficult to collect such data for the Italian real estate construction sector, due to its lack of transparency, so that the novelty for the Italian scenario is the dataset itself. Another interest perspective of this survey is that socio-economic characteristics were also recorded; they are often studied in urban economics, but are usually related to property purchase prices and values, not to construction costs. The data come from an analysis of Canesi and Marella regarding the relationship between the trend of construction costs and the socio-economic conditions of the reference setting, such as the mean years of schooling of the workforce, housing market trends, and average per capita income.

  8. The method of selecting an integrated development territory for the high-rise unique constructions

    Directory of Open Access Journals (Sweden)

    Sheina Svetlana

    2018-01-01

    Full Text Available On the basis of data provided by the Department of architecture and urban planning of the city of Rostov-on-don, the problem of the choice of the territory for complex development that will be in priority for the construction of high-rise and unique buildings is solved. The objective of the study was the development of a methodology for selection of the area and the implementation of the proposed method on the example of evaluation of four-territories complex development. The developed method along with standard indicators of complex evaluation considers additional indicators that assess the territory from the position of high-rise unique building. The final result of the study is the rankings of the functional priority areas that takes into account the construction of both residential and public and business objects of unique high-rise construction. The use of the developed methodology will allow investors and customers to assess the investment attractiveness of the future unique construction project on the proposed site.

  9. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  10. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  11. Comprehensive assessment of the efficiency of high-rise construction projects in the form of urban blocks

    Science.gov (United States)

    Orlov, Alexandr; Chubarkina, Irina

    2018-03-01

    The paper is dedicated to main modern trends in the area of high-rise construction. The classification of buildings and structures by height is given. Functional distribution by the height of buildings is presented. A review of positive and negative aspects of high-rise construction from the economic point of view is given. On the basis of the data obtained, it is proposed to build up residential microdistricts in the form of urban blocks. A plan of microdistricts development is presented. It takes into account urban blocks and includes their main characteristics. An economic and mathematical model was developed to carry out a comprehensive assessment of the effectiveness of high-rise construction projects.

  12. Historical construction costs of global nuclear power reactors

    International Nuclear Information System (INIS)

    Lovering, Jessica R.; Yip, Arthur; Nordhaus, Ted

    2016-01-01

    The existing literature on the construction costs of nuclear power reactors has focused almost exclusively on trends in construction costs in only two countries, the United States and France, and during two decades, the 1970s and 1980s. These analyses, Koomey and Hultman (2007); Grubler (2010), and Escobar-Rangel and Lévêque (2015), study only 26% of reactors built globally between 1960 and 2010, providing an incomplete picture of the economic evolution of nuclear power construction. This study curates historical reactor-specific overnight construction cost (OCC) data that broaden the scope of study substantially, covering the full cost history for 349 reactors in the US, France, Canada, West Germany, Japan, India, and South Korea, encompassing 58% of all reactors built globally. We find that trends in costs have varied significantly in magnitude and in structure by era, country, and experience. In contrast to the rapid cost escalation that characterized nuclear construction in the United States, we find evidence of much milder cost escalation in many countries, including absolute cost declines in some countries and specific eras. Our new findings suggest that there is no inherent cost escalation trend associated with nuclear technology. - Highlights: •Comprehensive analysis of nuclear power construction cost experience. •Coverage for early and recent reactors in seven countries. •International comparisons and re-evaluation of learning. •Cost trends vary by country and era; some experience cost stability or decline.

  13. Analysis of nuclear-power construction costs

    International Nuclear Information System (INIS)

    Jansma, G.L.; Borcherding, J.D.

    1988-01-01

    This paper discusses the use of regression analysis for estimating construction costs. The estimate is based on an historical data base and quantification of key factors considered external to project management. This technique is not intended as a replacement for detailed cost estimates but can provide information useful to the cost-estimating process and to top management interested in evaluating project management. The focus of this paper is the nuclear-power construction industry but the technique is applicable beyond this example. The approach and critical assumptions are also useful in a public-policy situation where utility commissions are evaluating construction in prudence reviews and making comparisons to other nuclear projects. 13 references, 2 figures

  14. Analysis of nuclear power plant construction costs

    International Nuclear Information System (INIS)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs

  15. Analysis of nuclear power plant construction costs

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

  16. 874 CONSTRUCTION COST MODELS FOR HIGHRISE OFFICE ...

    African Journals Online (AJOL)

    USER

    2015-10-28

    Oct 28, 2015 ... will not only reduce the stress on estimators but also enhance the accuracy of cost estimates. The resulting 11 ... cost estimating process to work together to ..... construction estimators in Hong. Kong. Construction Management.

  17. One of the criteria for selecting a contractor for high-rise construction

    Science.gov (United States)

    Tuskaeva, Zalina; Tagirov, Timur

    2018-03-01

    The mechanisms for management of the building complex used and proposed to date do not always provide the required result in the assessment of the construction organization facilities. Therefore, the development of new effective methods for such an assessment is an urgent task especially in questions related to high-rise construction. The article formally sets the task of assessing the technical facilities of a construction organization. Due to the use of expert methods, the weighted values of the coefficients of local indicators for technical facilities are identified

  18. Methodical foundations of the preparation of highly valued personnel for high-rise construction

    Science.gov (United States)

    Belyaeva, Svetlana; Belyantseva, Oksana; Safonova, Nataliya; Vasilyeva, Olga

    2018-03-01

    When carrying out design and survey and construction and installation works for such an innovative type of activity as high-rise construction, the problem of personnel qualification becomes urgent. The article poses a research problem, identifies the main reasons for the need for training highly qualified specialists in construction, and suggests areas for improving training. The expediency of development of mentoring system was proved, the corresponding model of interaction between educational institutions and construction enterprises was offered, key interaction effects were evaluated.

  19. Calculation of high-rise construction limitations for non-resident housing fund in megacities

    Directory of Open Access Journals (Sweden)

    Iliashenko Oksana

    2018-01-01

    Full Text Available The paper is devoted to topical issues of urban planning in terms of high-rise construction of a non-resident housing stock in relation to megacities. We consider this issue taking into account the limitations of natural, communal and social resources. The problem is especially acute for the overwhelming majority of the state capitals, as well as cities with historical heritage that are of great interest due to the rapid development of tourism and the high mobility of the population in the world. The growth of the population of many states capitals led to the use of high-rise buildings as a non-resident housing stock. However, there are a number of restrictions on the high-rise construction of non-resident housing stock in megacities. The authors formalize the problem of determining the optimal ratio of the volume of urban buildings belonging to the high-rise buildings types and intended for non-residents to a common housing fund. We conduct economic calculations to determine the quantitative indicators. It can be used as the basis for administrative measures aimed at limiting the people flow arriving with the intention of temporarily deploying in megacities.

  20. Calculation of high-rise construction limitations for non-resident housing fund in megacities

    Science.gov (United States)

    Iliashenko, Oksana; Krasnov, Sergey; Sergeev, Sergey

    2018-03-01

    The paper is devoted to topical issues of urban planning in terms of high-rise construction of a non-resident housing stock in relation to megacities. We consider this issue taking into account the limitations of natural, communal and social resources. The problem is especially acute for the overwhelming majority of the state capitals, as well as cities with historical heritage that are of great interest due to the rapid development of tourism and the high mobility of the population in the world. The growth of the population of many states capitals led to the use of high-rise buildings as a non-resident housing stock. However, there are a number of restrictions on the high-rise construction of non-resident housing stock in megacities. The authors formalize the problem of determining the optimal ratio of the volume of urban buildings belonging to the high-rise buildings types and intended for non-residents to a common housing fund. We conduct economic calculations to determine the quantitative indicators. It can be used as the basis for administrative measures aimed at limiting the people flow arriving with the intention of temporarily deploying in megacities.

  1. Current-day matters of administration and law in the field of high-rise construction

    Science.gov (United States)

    Voskresenskaya, Elena; Snetkov, Vitaly; Tebryaev, Alexander

    2018-03-01

    The article touches upon main reasons for high-rise construction: increase in energy consumption and limited availability of site in the big cities of Russia. Increase in energy consumption is related with construction, transportation and applying of ventilation and air conditioning systems. Nowadays, there are developed a lot of design and engineer solutions, that include autonomous systems as well as passive methods with low energy consumption rate, which are interrelated with local climate conditions. Certain architectural solutions contribute to energy consumption decrease: building orientation with respect to the cardinal directions, taking into account the prevailing cold wind directions, maximum glazing of the southern facades and minimum glazing of the northern ones, what plays a big role in hard climate conditions. Limited availability of site for construction in the big cities resulted in rapid development of the high-rise construction, which today prevails in terms of quantitative indicators of civil engineering.

  2. Wage and Benefit Changes in Response to Rising Health Insurance Costs

    OpenAIRE

    Dana Goldman; Neeraj Sood; Arleen Leibowitz

    2005-01-01

    Many companies have defined-contribution benefit plans requiring employees to pay the full cost (before taxes) of more generous health insurance choices. Research has shown that employee decisions are quite responsive to these arrangements. What is less clear is how the total compensation package changes when health insurance premiums rise. This paper examines employee compensation decisions during a three-year period when health insurance premiums were rising rapidly. The data come from a si...

  3. Evaluation of construction cost of pyro-partitioning plant

    International Nuclear Information System (INIS)

    Kinoshita, Kensuke; Kurata, Masateru; Inoue, Tadashi

    1999-01-01

    This study was conducted to evaluate the construction cost of a pyro-partitioning plant. The plant capacity was chosen to accommodate processing of the HLLW generated by PUREX reprocessing of 800 ton of spent LWR fuel. The block flow diagram and mass balance obtained from our previous experimental data were used to produce a detailed process-flow diagram and to design the plant. In this evaluation, the plant was estimated to cover an area of about 90 m x 70 m, and to cost $576 million for construction. This study shows that the cost of process equipments, such as reaction vessels, accountability tanks and so on, is just about 13% of total construction cost. On the other hand, the cost of process robots and the equipments for key measurement point (KMP) is major part in the cost of in-cell equipment. So it is clear that the construction cost can be reduced by reducing the number of material balance area (MBA) and KMP. (author)

  4. Vertical cities - the new form of high-rise construction evolution

    Science.gov (United States)

    Akristiniy, Vera A.; Boriskina, Yulia I.

    2018-03-01

    The article considers the basic principles of the vertical cities formation for the creation of a comfortable urban environment in conditions of rapid population growth and limited territories. As urban growth increases, there is a need for new concepts and approaches to urban space planning through the massive introduction of high-rise construction. The authors analyzed and systematized the list of high-tech solutions for arrangement the space of vertical cities, which are an integral part of the creation of the methodology for forming a high-rise buildings. Their concept differs in scale, presence of the big areas of public spaces, tendencies to self-sufficiency and sustainability, opportunity to offer the new unique comfortable environment to the population living in them.

  5. A Fall Protection System for High-Rise Construction

    Directory of Open Access Journals (Sweden)

    Haluk Çeçen

    2013-01-01

    Full Text Available In construction industry, the number of fatal and nonfatal occupational injuries is higher than other industries. Among causes of these accidents, “falls” play a key role. This situation reveals the importance for carrying out research in fall protection systems. In this paper, a practical, economical, and functional fall protection system is introduced. Following determination and evaluation of existing solutions, weekly brainstorming meetings were held among the responsible project staff (general coordinator, project coordinator, project manager, site manager, and health and safety manager. As a result of these meetings, design criteria were developed. Based on these criteria, the fall protection system for high-rise construction (FPSFHC was developed which satisfied all the specified design criteria. Required materials were procured from local dealers. In this paper, criteria used in design and details of the final design are presented. Field performance of the system is evaluated, and recommendations for further development and standardization of the system are added.

  6. The High Rise Low Cost Housing : Sustainable Neighbourhood Elements (Green Elements) in Malaysia

    Science.gov (United States)

    Wahi, Noraziah; Mohamad, Ismail; Mohamad Zin, Rosli; Munikanan, Vikneswaran; Junaini, Syahrizan

    2018-03-01

    The sustainable development is a vital measure to alleviate the greenhouse gas effect, global warming and any other environment issues. The sustainable neighbourhood concept is not new in Malaysia, However, the concept still needs attention and awareness from the stakeholders. This paper discusses on the sustainable neighbourhood elements specifically green elements application on the high rise low cost housing in Malaysia. Malaysia should have focused sustainable neighbourhood planning and design especially on the high rise low cost housing therefore the future generation can be benefited from this type development.

  7. 874 CONSTRUCTION COST MODELS FOR HIGHRISE OFFICE ...

    African Journals Online (AJOL)

    USER

    2015-10-28

    Oct 28, 2015 ... cost-significant items, 15 priced bills of quantities of high rise office building pro ects executed or awarded in Nigeria between 2002 and 2011 were analysed. The study found that11 (29. %) out of 3 bill items were cost-significant accounting for 2.2% of total value of the work. The implication of the finding is ...

  8. Consumerism and wellness: rising tide, falling cost.

    Science.gov (United States)

    Domaszewicz, Alexander

    2008-01-01

    Annual employer-sponsored health plan cost increases have been slowing incrementally due to slowing health care utilization--a phenomenon very likely tied to the proliferation of health management activities, wellness programs and other consumerism strategies. This article describes the sharp rise in recent years of consumer-directed health plans (CDHPs) and explains what developments must happen for genuine consumer-directed health care to realize its full potential. These developments include gathering transparent health care information, increasing consumer demand for that information and creating truly intuitive data solutions that allow consumers to easily access information in order to make better health care decisions.

  9. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  10. Quantity Surveying Undergraduates’ Awareness on Cost Significant of High-Rise Condominium Projects in Malaysia: The Case of a Private University in Malaysia

    Directory of Open Access Journals (Sweden)

    Peng Lee Wah

    2016-01-01

    Full Text Available Recent developments in quantity surveying (QS emphasised the importance of identifying cost significant elements (CSE. The knowledge on CSE of high-rise condominium projects (HRCP is essential as high-rise residential multi-unit projects are the next option in building construction due to limited land areas in urban areas. This study aims to determine the levels of awareness among QS undergraduates of a private university in Malaysia on CSE of HRCP in Malaysia. The respondents’ knowledge on CSE has not achieved a satisfactory level. Both male and female respondents have the same levels of awareness on CSE. Remedial strategies to improve this situation are recommended.

  11. Determining the Supply of Material Resources for High-Rise Construction: Scenario Approach

    Science.gov (United States)

    Minnullina, Anna; Vasiliev, Vladimir

    2018-03-01

    This article presents a multi-criteria approach to determining the supply of material resources for high-rise construction under certain and uncertain conditions, which enables integrating a number of existing models into a fairly compact generalised economic and mathematical model developed for two extreme scenarios.

  12. Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project

    Science.gov (United States)

    Zhou, Yong; Huang, You Zhen

    2018-06-01

    This paper mainly studies the green construction scheme of a high-rise residential building project. From "four sections one environmental protection", saving material, water saving, energy saving, economical use of land and environmental protection conduct analysis and research. Adopting scientific, advanced, reasonable and economical construction technology measures, implementing green construction method. Promoting energy-saving technologies in buildings, ensuring the sustainable use of resources, Maximum savings of resources and energy, increase energy efficiency, to reduce pollution, reducing the adverse environmental impact of construction activities, ensure construction safety, build sustainable buildings.

  13. Conducting experimental investigations of wind influence on high-rise constructions

    Science.gov (United States)

    Poddaeva, Olga I.; Fedosova, Anastasia N.; Churin, Pavel S.; Gribach, Julia S.

    2018-03-01

    The design of buildings with a height of more than 100 meters is accompanied by strict control in determining the external loads and the subsequent calculation of building structures, which is due to the uniqueness of these facilities. An important factor, the impact of which must be carefully studied at the stage of development of project documentation, is the wind. This work is devoted to the problem of studying the wind impact on buildings above 100 meters. In the article the technique of carrying out of experimental researches of wind influence on high-rise buildings and constructions, developed in the Educational-research-and-production laboratory on aerodynamic and aeroacoustic tests of building designs of NRU MGSU is presented. The publication contains a description of the main stages of the implementation of wind tunnel tests. The article presents the approbation of the methodology, based on the presented algorithm, on the example of a high-rise building under construction. This paper reflects the key requirements that are established at different stages of performing wind impact studies, as well as the results obtained, including the average values of the aerodynamic pressure coefficients, total forces and aerodynamic drag coefficients. Based on the results of the work, conclusions are presented.

  14. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  15. Technological aspects of lift-slab method in high-rise-building construction.

    Science.gov (United States)

    Gaidukov, Pavel V.; Pugach, Evgeny M.

    2018-03-01

    The utilization efficiency of slab lifting technology for high-rise-building construction is regarded in the present article. The main problem of the article is organizing technology abilities indication, which proves the method application possibility. There is the comparing of lifting technologies and sequential concrete-frame extension, as follows: the first one: the parameters are defined, and the second one: the organizational model is executed. This model defines borders of the usage methods, as well. There is the mathematic model creating, which describes boundary conditions of the present technologies usage. This model allows to predict construction efficiency for different stored-number buildings.

  16. Development of a simple estimation tool for LMFBR construction cost

    International Nuclear Information System (INIS)

    Yoshida, Kazuo; Kinoshita, Izumi

    1999-01-01

    A simple tool for estimating the construction costs of liquid-metal-cooled fast breeder reactors (LMFBRs), 'Simple Cost' was developed in this study. Simple Cost is based on a new estimation formula that can reduce the amount of design data required to estimate construction costs. Consequently, Simple cost can be used to estimate the construction costs of innovative LMFBR concepts for which detailed design has not been carried out. The results of test calculation show that Simple Cost provides cost estimations equivalent to those obtained with conventional methods within the range of plant power from 325 to 1500 MWe. Sensitivity analyses for typical design parameters were conducted using Simple Cost. The effects of four major parameters - reactor vessel diameter, core outlet temperature, sodium handling area and number of secondary loops - on the construction costs of LMFBRs were evaluated quantitatively. The results show that the reduction of sodium handling area is particularly effective in reducing construction costs. (author)

  17. Modern Methods for Cost Management in Construction Enterprises

    Directory of Open Access Journals (Sweden)

    Mesároš Peter

    2015-06-01

    Full Text Available Cost management should be seen as an essential function of enterprises which perform their activities in current market environment. One of the main factors affecting the level of achieved profit and favourable market position is cost structure. The company's ability to obtain necessary and reliable information on their own cost, subsequent processing and effective cost management is crucial for achieving success. This study focuses on cost management and the use of modern methods of cost management in construction enterprises. The aim of this paper is to identify approaches to cost management in Slovak construction enterprises, based on own empirical research.

  18. Construction Cost Growth for New Department of Energy Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kubic, Jr., William L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-05-25

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facility (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.

  19. Life quality and living standards in big cities under conditions of high-rise construction development

    Science.gov (United States)

    Avdeeva, Elena; Averina, Tatiana; Kochetova, Larisa

    2018-03-01

    Modern urbanization processes occurring on a global scale inevitably lead to an increase in population density in large cities. People assess the state of life quality and living standards of megalopolises under conditions of high-rise construction development ambiguously. Using SWOT analysis, the authors distinguished positive and negative aspects of high-rise construction, highlighted threats to its development and its opportunities. The article considers the model of development of the city's industry and infrastructure, which enables determining the optimal volume of production by sectors and branches of city economy in order to increase its innovative, production and economic potential and business activity.

  20. Theoretical framework of the causes of construction time and cost overruns

    Science.gov (United States)

    Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.

    2017-11-01

    Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.

  1. SUBSTANTIATION OF THE COST OF HOUSING CONSTRUCTION INCLUDING THE FACTOR OF INVESTMENT ATTRACTIVENESS OF TERRITORIES

    Directory of Open Access Journals (Sweden)

    ZAIATS Yi. I.

    2015-11-01

    Full Text Available Problem statement. For planning and organization of urban construction is necessary to analyze the use of areas. Territorial resources of the city, being used for construction and other urban purposes, consists of plots of land: disposable, reserved and undeveloped in previous years of construction in progress; residential districts and blocks of obsolete housing fund; industrial and municipal and warehouse enterprises being used irrationally or stopped to work; the defence department, where the amortized warehouses and other main funds are that are not used by purpose; agricultural enterprises where the obsolete industrial funds, haying, nurseries, greenhouses. The number of free areas suitable for future urban development is extremely limited. However a considerable part of the territories of almost all functional zones is used inefficiently. Purpose. Formalization of a factor of investment attractiveness of territories for the further identification and research of the connection between it and the cost of housing construction is necessary. Conclusion. The identification of regularities of influence of the factor of investment attractiveness of territories on the cost of construction of high-rise buildings allow to obtain a quantitative estimate of this effect and can be used in the development of the methodology of substantiation of the expediency and effectiveness of the implementation of highrise construction projects, based on organizational and technological aspects.

  2. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    Science.gov (United States)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  3. Fast-track, low-cost construction starts with the owner

    International Nuclear Information System (INIS)

    Smock, R.

    1992-01-01

    As we approach the threshold of a new round of ordering of base load generating capacity after a 15-year hiatus, power pant owners are taking a long, hard look at construction. The last round of base load construction was plagued with construction cost overruns and delays. Billions of dollars in cost overruns, many attributable to construction delays, were not allowed to be placed in utilities' rate bases. Those problems will not be tolerated in the next round. During the past few years the construction climate has changed. Non-utility power producers have demonstrated and ability to build small power plants-including many steam plants burning solid fuels-quickly and at surprisingly low costs. In this paper the cost-plus approach traditionally taken by more utilities, who will lead in the base-load construction phase, is being seriously questioned

  4. Construction cost forecast model : model documentation and technical notes.

    Science.gov (United States)

    2013-05-01

    Construction cost indices are generally estimated with Laspeyres, Paasche, or Fisher indices that allow changes : in the quantities of construction bid items, as well as changes in price to change the cost indices of those items. : These cost indices...

  5. Space construction system analysis. Part 2: Cost and programmatics

    Science.gov (United States)

    Vonflue, F. W.; Cooper, W.

    1980-01-01

    Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.

  6. Construction of high-rise buildings in the Far East of Russia

    Science.gov (United States)

    Kudryavtsev, Sergey; Bugunov, Semen; Pogulyaeva, Evgeniya; Peters, Anastasiya; Kotenko, Zhanna; Grigor'yev, Danil

    2018-03-01

    The construction of high-rise buildings on plate foundation in geotechnical conditions of the Russian Far East is a complicated problem. In this respect foundation engineering becomes rather essential. In order to set a firm foundation it is necessary to take into account the pressure distribution at the structure base, in homogeneity of building deformation, which is due to collaborative geotechnical calculations complicated by a number of factors: actual over-placement of soils, the complex geometry of the building under construction, spatial work of the foundation ground with consideration for physical nonlinearity, the influence of the stiffness of the superstructure (reinforced concrete framing) upon the development of foundation deformations, foundation performance (the performance of the bed plate under the building and stairwells), the origination of internal forces in the superstructure with differential settlement. The solution of spatial problems regarding the mutual interaction between buildings and foundations with account of the factors mentioned above is fully achievable via the application of numerical modeling methodology. The work makes a review of the results of high-rise plate building numerical modeling in geotechnical conditions of the Russian Far East by way of the example of Khabarovsk city.

  7. THE FORMATION OF DESIGN AND ORGANIZATIONAL AND TECHNOLOGICAL DECISIONS OF THE CONSTRUCTION OF HIGH-RISE MULTIPURPOSE COMPLEXES

    Directory of Open Access Journals (Sweden)

    BOLSHAKOV V. I.

    2016-05-01

    Full Text Available Purpose. The formation of the many ways the construction of high-rise multipurpose complexes. Methodology. The formation of system implementation variants of creation and functioning of high-rise multipurpose complexes using combinatorial morphological analysis and synthesis. Findings. Many life cycle options of high-rise multipurpose complexes. Originality. The developed method of formation of organizational and technological solutions adapted to the conditions of the construction of high-rise multipurpose complexes, which provides the opportunity for multi-variant conditions, taking into account regulatory requirements for fire safety, insolation of buildings and premises, protection against noise and vibration, energy efficiency, infrastructure and population density of a residential district with a full range of institutions and enterprises of local significance, within existing resource constraints, to ensure the commissioning of objects with specified technical and economic characteristics. Practical value. The proposed model and the methodology allow to determine a rational variant of high-rise building according to specified criteria and constraints.

  8. Nuclear power generation as seen from construction aspect

    International Nuclear Information System (INIS)

    Osaki, Yorihiko

    1984-01-01

    The measures to vitalize atomic energy industry in low economical growth age are grasped from the viewpoint of heightening the quality of technology, and the improvement of the economical efficiency of nuclear power generation as seen from construction aspect is discussed. By 2000, the nuclear power generation in Japan will be increased by about four times to 62 million kW, and the proportion of nuclear power increases steadily. Recently, the nuclear power stations in Japan have been stably operated at high level, and the capacity ratio has exceeded 70 %. However, the power generation cost tends to rise, and it is feared that the economical advantage over thermal power will be lost. Recently, the construction cost of nuclear power plants has continued to rise, which causes the high cost of nuclear power. The reason of the high construction cost is in short too much quantity of materials and long construction period. As the proposal to reduce the construction cost, three stages of the rationalization are discussed, such as the rationalization of simulated earthquake for design and the improvement of reactor building design. The promotion of technical development is indispensable for the cost reduction. (Kako, I.)

  9. Costs of occupational injuries in construction in the United States.

    Science.gov (United States)

    Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong

    2007-11-01

    This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.

  10. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  11. Analysis of Trends in Housing Construction Cost in Nigeria from ...

    African Journals Online (AJOL)

    The upward trends in housing construction costs have been a major issue in the economy as a whole. The research uses typical 3 - bedroom bungalow in Lagos to analyze the trends in housing construction cost from 2000 to 2009. The basic question for this research is whether the inflation in housing construction costs ...

  12. The use of nanomodified concrete in construction of high-rise buildings

    Science.gov (United States)

    Prokhorov, Sergei

    2018-03-01

    Construction is one of the leading economy sectors. Currently, concrete is the basis of most of the structural elements, without which it is impossible to imagine the construction of a single building or facility. Their strength, reinforcement and the period of concrete lifetime are determined at the design stage, taking into account long-term operation. However, in real life, the number of impacts that affects the structural strength is pretty high. In some cases, they are random and do not have standardized values. This is especially true in the construction and exploitation of high-rise buildings and structures. Unlike the multi-storey buildings, they experience significant loads already at the stage of erection, as they support load-lifting mechanisms, formwork systems, workers, etc. The purpose of the presented article is to develop a methodology for estimating the internal fatigue of concrete structures based on changes in their electrical conductivity.

  13. Technology of surface wastewater purification, including high-rise construction areas

    Science.gov (United States)

    Tsyba, Anna; Skolubovich, Yury

    2018-03-01

    Despite on the improvements in the quality of high-rise construction areas and industrial wastewater treatment, the pollution of water bodies continues to increase. This is due to the organized and unorganized surface untreated sewage entry into the reservoirs. The qualitative analysis of some cities' surface sewage composition is carried out in the work. Based on the published literature review, the characteristic contamination present in surface wastewater was identified. The paper proposes a new technology for the treatment of surface sewage and presents the results of preliminary studies.

  14. Construction of a low-cost luximeter

    Science.gov (United States)

    Pedroso, L. S.; de Macedo, J. A.; de Araújo, M. S. T.; Voelzke, M. R.

    2016-04-01

    This paper proposes the construction of an electronic instrument called digital luximeter, combining simplicity and low cost, making it simpler and cheaper than those on the market. Its construction tends to facilitate dissemination and access to this type of measuring instrument between high school teachers and educational institutions, making it ideal to be a science lab.

  15. Belowground advantages in construction cost facilitate a cryptic plant invasion.

    Science.gov (United States)

    Caplan, Joshua S; Wheaton, Christine N; Mozdzer, Thomas J

    2014-04-30

    The energetic cost of plant organ construction is a functional trait that is useful for understanding carbon investment during growth (e.g. the resource acquisition vs. tissue longevity tradeoff), as well as in response to global change factors like elevated CO2 and N. Despite the enormous importance of roots and rhizomes in acquiring soil resources and responding to global change, construction costs have been studied almost exclusively in leaves. We sought to determine how construction costs of aboveground and belowground organs differed between native and introduced lineages of a geographically widely dispersed wetland plant species (Phragmites australis) under varying levels of CO2 and N. We grew plants under ambient and elevated atmospheric CO2, as well as under two levels of soil nitrogen. We determined construction costs for leaves, stems, rhizomes and roots, as well as for whole plants. Across all treatment conditions, the introduced lineage of Phragmites had a 4.3 % lower mean rhizome construction cost than the native. Whole-plant construction costs were also smaller for the introduced lineage, with the largest difference in sample means (3.3 %) occurring under ambient conditions. In having lower rhizome and plant-scale construction costs, the introduced lineage can recoup its investment in tissue construction more quickly, enabling it to generate additional biomass with the same energetic investment. Our results suggest that introduced Phragmites has had an advantageous tissue investment strategy under historic CO2 and N levels, which has facilitated key rhizome processes, such as clonal spread. We recommend that construction costs for multiple organ types be included in future studies of plant carbon economy, especially those investigating global change. Published by Oxford University Press on behalf of the Annals of Botany Company.

  16. Increase in Population Density and Aggravation of Social and Psychological Problems in Areas with High-Rise Construction

    Directory of Open Access Journals (Sweden)

    Romanova Elena

    2018-01-01

    Full Text Available High-rise apartment houses have technical and economic advantages in areas with dense population. Their placement in the central part of the city allows increasing the number of living space in the limited territory, to bring population to the place of employment and reduce pendular migration. But increase in population density leads to psychological problems: level of a stress, fatigue increases, the number of phobias grows, infectious diseases extend quicker. These problems can be solved at resettlement of inhabitants to the suburb. However such decision leads to aggravation of a transport problem and the pulsing increase in population density in the downtown and on its suburb. To solve a transport problem, it is necessary not to increase the square of the cities. Therefore in the suburbs is also used high-rise construction. But high-rise residential districts on the suburb of the city get own social problems which are capable to destroy all advantages of high-rise construction.

  17. Increase in Population Density and Aggravation of Social and Psychological Problems in Areas with High-Rise Construction

    Science.gov (United States)

    Romanova, Elena

    2018-03-01

    High-rise apartment houses have technical and economic advantages in areas with dense population. Their placement in the central part of the city allows increasing the number of living space in the limited territory, to bring population to the place of employment and reduce pendular migration. But increase in population density leads to psychological problems: level of a stress, fatigue increases, the number of phobias grows, infectious diseases extend quicker. These problems can be solved at resettlement of inhabitants to the suburb. However such decision leads to aggravation of a transport problem and the pulsing increase in population density in the downtown and on its suburb. To solve a transport problem, it is necessary not to increase the square of the cities. Therefore in the suburbs is also used high-rise construction. But high-rise residential districts on the suburb of the city get own social problems which are capable to destroy all advantages of high-rise construction.

  18. Evolution of high-rise construction in Leningrad - Saint Petersburg in the middle of the 20th - Early 21st centuries: projects and Implementation

    Science.gov (United States)

    Vaytens, Andrey; Rusanov, Gennadiy; Skryabin, Pavel

    2018-03-01

    One of the most important issues in national urban planning is arrangement of high-rise buildings in the largest cities of Russia. This issue becomes especially acute in such cities as Saint Petersburg, which has unique architectural and urban-planning heritage preserved to a great extent. In this regard, it seems important to trace the evolution of high-rise construction development and arrangement in Leningrad - Saint Petersburg in the middle of the 20th — early 21st centuries. The goal of the article is to consider high-rise construction development regarding both public and residential buildings in comparison of project ideas and results of their implementation in the 1940s-2000s. Prerequisites and issues of high-rise construction of that period are considered. Particular attention is paid to changes in the official urban-planning policy, regulatory framework and attitude of city authorities to high-rise construction. The study was carried out with the consideration of the following historic periods differing in their urban-planning policy: the late 1940s-1950s; 1960s; 1970-1980s; 1990s; 2000s-2010s. Economical prerequisites of high-rise construction and their influence on the modern urban-planning policy during the post-Soviet period are considered. In conclusion, an attempt is made to determine tendencies of high-rise construction development in Saint Petersburg.

  19. Cost-derived indices for building design and construction ...

    African Journals Online (AJOL)

    Also as multiples of gfi, substructure cost index, sci and roofing cost index, rci could predict componental costs of substructure and roofing for phased development purposes. Keywords: Cost Indices, Building Design, Building Construction Journal of Modeling, Design and Management of Engineering Systems, Vol.

  20. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  1. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  2. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  3. 20 CFR 404.272 - Indexes we use to measure the rise in the cost-of-living.

    Science.gov (United States)

    2010-04-01

    ... cost-of-living. 404.272 Section 404.272 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE, SURVIVORS AND DISABILITY INSURANCE (1950- ) Computing Primary Insurance Amounts Cost-Of-Living Increases § 404.272 Indexes we use to measure the rise in the cost-of-living. (a) The bases. To measure...

  4. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  5. Safety cost management in construction companies: A proposal classification.

    Science.gov (United States)

    López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C

    2016-06-16

    Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.

  6. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  7. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  8. Forecasting Canadian nuclear power station construction costs

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequences of the decision as possible. This understanding must be provided by the evaluation of future situations. A key consideration in an evaluation is the financial component. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A brief review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A database is built and indexes are prepared. Based on these indexes, an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of 40 years are generated and applications (such as alternative scenario forecasts and range forecasts) to uncertainty assessment and/or decision-making are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the first for Canadian NGS constructions. (author)

  9. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  10. Justification of directions of technological and price audit systems changes for the purpose of high-rise construction innovating

    Science.gov (United States)

    Rogacheva, Yana; Panenkov, Andrey; Petrikova, Zinaida; Nezhnikova, Ekaterina

    2018-03-01

    Improving the quality of high-rise buildings under modern conditions should be based not only on compliance with the norms of technical regulations, but also on ensuring energy efficiency, environmental friendliness, and intellectuality, which can be achieved only through the introduction of innovations at all stages of the life cycle of the investment project. Authors of this article justified the need for a mechanism of technological and price audit of projects. They also suggested the model of life cycle of organizational and economic changes, connected with implantation of the mechanism of projects audit. They showed innovation character of ecological high-rise construction for the whole life cycle. Authors also made proposals to change the audit system for high-rise construction projects in the focus of its environmental friendliness.

  11. Justification of directions of technological and price audit systems changes for the purpose of high-rise construction innovating

    Directory of Open Access Journals (Sweden)

    Rogacheva Yana

    2018-01-01

    Full Text Available Improving the quality of high-rise buildings under modern conditions should be based not only on compliance with the norms of technical regulations, but also on ensuring energy efficiency, environmental friendliness, and intellectuality, which can be achieved only through the introduction of innovations at all stages of the life cycle of the investment project. Authors of this article justified the need for a mechanism of technological and price audit of projects. They also suggested the model of life cycle of organizational and economic changes, connected with implantation of the mechanism of projects audit. They showed innovation character of ecological high-rise construction for the whole life cycle. Authors also made proposals to change the audit system for high-rise construction projects in the focus of its environmental friendliness.

  12. Designing to target cost: one approach to design/construction integration

    DEFF Research Database (Denmark)

    Jørgensen, Bo

    2005-01-01

    One approach to a more integrated construction delivery process is the concept of ‘designing to target cost’ of which the first examples of application within a lean construction framework have recently been seen. This paper introduces the main principles of the design to target cost method...... and discusses the applicability of this approach to construction. The low degree of organizational and technical continuity from one construction project to the next limits the applicability of the design for target cost approach when compared to its origin in product development of mass manufactured artefacts....... It can be argued that design to target cost may also provide a frame for developing the supply chain towards better coordination and collaboration. Thus methods of design to target cost may serve to facilitate the development of a more integrated supply chain....

  13. Construction engineering inspection direct cost survey.

    Science.gov (United States)

    2014-07-01

    The objective of the study was to provide a rationale to Georgia Department of Transportation : (GDOT) for Direct Costs in terms of salary and wages charged by qualified independent : contractors performing Construction Engineering Inspection (CEI) s...

  14. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  15. South Africa’s rising logistics costs: An uncertain future

    Directory of Open Access Journals (Sweden)

    Jan H. Havenga

    2014-12-01

    Full Text Available A country’s competitiveness can be severely hampered by an uncompetitive freight logistics system. During the first decade of the 21st century, two in-depth models were developed for South Africa which provide a framework for measuring and improving the country’s freight logistics system – the cost of logistics survey and the freight demand model. These models also allow for the development of scenarios for key identified risks. The objectives of this study were to provide an overview of South Africa’s surface freight transport industry,identify key risks to national competitiveness and suggest ways in which these risks could be mitigated. Freight flows were modelled by disaggregating the national input–output model into 372 origin–destination pairs and 71 commodity groups, followed by distance decay gravity-modelling. Logistics costs were calculated by relating commodity-level freight flows to the costs of fulfilling associated logistical functions. South Africa’s economy is highly transport intensive. Excessive dependence on road freight transport exacerbates this situation. Furthermore, the road freight transport’s key cost driver is fuel, driven in turn by the oil price. Scenario analysis indicated the risk posed by this rising and volatile input and should provide impetus for policy instruments to reduce transport intensity. As such, this study concluded that a reduction in freight transport intensity is required to reduce exposure to volatile international oil prices.

  16. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  17. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Science.gov (United States)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  18. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Directory of Open Access Journals (Sweden)

    Burmistrov Andrey

    2018-01-01

    Full Text Available The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  19. 23 CFR 140.907 - Overhead and indirect construction costs.

    Science.gov (United States)

    2010-04-01

    ... accounting principles; (2) The costs included in the distribution are limited to costs actually incurred by...), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations... 23 Highways 1 2010-04-01 2010-04-01 false Overhead and indirect construction costs. 140.907...

  20. Multiple-factor analysis of the net cost of drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Karnaushevskaya, Zh I; Kukhtevich, L I; Lisovskaya, G F; Maguryak, N S; Nasinnik, Z A

    1979-01-01

    Basic factors in the rise in net cost of drilling operations are examined in the association ''Ukrneft''. A mathematical model of their net cost is constructed which takes into consideration the given factors. A number of measures are suggested and their specific influence on the decrease in net cost of well construction is defined.

  1. Low-cost satellite mechanical design and construction

    Science.gov (United States)

    Boisjolie-Gair, Nathaniel; Straub, Jeremy

    2017-05-01

    This paper presents a discussion of techniques for low-cost design and construction of a CubeSat mechanical structure that can serve as a basis for academic programs and a starting point for government, military and commercial large-scale sensing networks, where the cost of each node must be minimized to facilitate system affordability and lower the cost and associated risk of losing any node. Spacecraft Design plays a large role in manufacturability. An intentionally simplified mechanical design is presented which reduces machining costs, as compared to more intricate designs that were considered. Several fabrication approaches are evaluated relative to the low-cost goal.

  2. The assessment of waters ecological state of the Crimea coastal near high-rise construction zones

    Science.gov (United States)

    Vetrova, Natalya; Ivanenko, Tatyana; Mannanov, Emran

    2018-03-01

    The relevance of our study is determined by the significant level of coastal sea waters pollution by sewage near high-rise construction zones, which determines the violation of the sanitary and hygienic of sea waters `characteristics and limits the possibilities for organizing recreational activities. The purpose of this study is to identify the ecological state of the marine aquatic area by the example of the Western Crimea near high-rise construction zones. The studies confirmed that the recreational and coastal area wastewater is intensely mixed with seawater, as a result, the pollution in the coastal strip of the sea in the area of deep water discharges sharply decrease. This happens because of water rapid rise to the surface and under the influence of the continuous movement of sea water huge masses with deep-water discharge, fresh wastewater is actively mixed with sea water. However, with no doubt, it is inadmissible to discharge sewage into the sea directly from the shore, but only at the estimated distance from the coast. The materials of the article can be useful for the management bodies and organizations involved in monitoring the quality of the coastal zone of the sea, teachers and students of higher educational institutions when assessing the ecological situation of the territories.

  3. A Semantics-Based Approach to Construction Cost Estimating

    Science.gov (United States)

    Niknam, Mehrdad

    2015-01-01

    A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…

  4. Our winters of discontent : addressing the problem of rising home heating costs

    International Nuclear Information System (INIS)

    Hughes, L.; Wysocki, A.

    2006-03-01

    The cost of space heating may soon increase due to rising fuel prices in international energy markets and the absence of federal and provincial energy security policies. This report examined the benefits and disadvantages of 2 approaches to assist those with limited incomes to meet heating requirements: (1) offering Low Income Fuel Assistance (LIFA) as a one-time payment during the heating season; and (2) the elimination of taxes for home heating fuels. The cost of home heating fuels and their impacts on consumers and governments were considered. A review of the Nova Scotia government's Keep the Heat program noted that the program was not responsive to increases in the price of home heating fuel, particularly if increases in a year exceeded the level of assistance. It was suggested that the removal of heating sales taxes could provide unnecessary windfalls to households with large homes, as well as windfall profits for landlords if savings were not passed on to tenants. Using Nova Scotia as a case study, an alternative support system was considered that guaranteed a set price for heating fuel for those in need. It was suggested that this approach could cost less than a lump-sum payment or the elimination of taxes on home-heating fuel. In addition, the approach would provide low-income consumers with predictable and affordable prices. It was concluded that as space heating energy costs continue to rise, all government fuel assistance programs run the risk of becoming larger and more costly. Other solutions included reducing Canada's dependence on fossil fuels through the use of solar energy; the reduction of residential energy demand; and the promotion of district heating. 26 refs., 9 tabs., 3 figs

  5. Quality Cost in the Construction Industry ' Preliminary Findings in Malaysia

    Directory of Open Access Journals (Sweden)

    Mukhtar Che Ali

    2010-06-01

    Full Text Available One of the key areas being emphasis in ISO 9001 Quality Management System (QMS is performance measurement towards continual improvement. Among the primary measuring tools is quality cost approach. Quality cost has been well practice in manufacturing sector but slowly gain its importance in construction industry. In fact Project Management Body of Knowledge (PMBOK has reckoned quality cost as one of the tool and technique in few of its management processes. In view of such circumstances that has prompted an effort to undertake a study to ascertain the level of knowledge and practice on quality cost in Malaysian construction landscape. The targeted group of respondents was the personnel in the project management team. Capitalizing Construction Industry Development Board (CIDB National Electronic Tendering Initiatives (NETI road shows which were held in year 2007 throughout the country, the author was able to garner 263 respondents representing the project management team. Subsequently the data gathered from the completed forms were analyzed using Statistical Package for Social Science (SPSS software. General findings indicated that the level of knowledge and practice on quality cost among the project management team were relatively low. One of the main contributing factors was poor knowledge in the area related to quality cost. Despite of such scenario most of the respondents showed their interest in acquiring knowledge in the field of quality cost. Hence quality cost approach is at the infancy stage in Malaysian construction industry.

  6. Prevailing Wage Regulations and School Construction Costs: Evidence from British Columbia.

    Science.gov (United States)

    Bilginsoy, Cihan; Philips, Peter

    2000-01-01

    Examines effects of prevailing wage laws on school construction costs, using final cost data from six British Columbia school districts. When controlling for factors such as construction business cycle, number of competitors, and school type, there was no significant unit cost change following the Skill Development and Fair Wage Policy Act.…

  7. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthélemy, Michel; Escobar Rangel, Lina

    2015-01-01

    This paper provides an econometric analysis of nuclear reactor construction costs in France and the United States based on overnight costs data. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using change in expected electricity demand as instrument. We argue that the construction of nuclear reactors can benefit from standardization gains through two channels. First, short term coordination benefits can arise when the diversity of nuclear reactors' designs under construction is low. Second, long term benefits can occur due to learning spillovers from past constructions of similar reactors. We find that construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect–Engineer. In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. -- Highlights: •This paper analyses the determinants of nuclear reactors construction costs and lead-time. •We study short term (coordination gains) and long term (learning by doing) benefits of standardization in France and the US. •Results show that standardization of nuclear programs is a key factor for reducing construction costs. •We also suggest that technological progress has contributed to construction costs escalation

  8. Analysis of the Key and Difficult Points in the Engineering Construction Technology of the Steel Structures of a Super High-rise Building

    Science.gov (United States)

    Dou, Lijun; Li, Hengxu

    2017-07-01

    In recent years, with the rapid development of the economy of China, the traditional building structure has not been able to meet the current people’s demands and the super high-rise building has become a symbol of a city. In the current period, the research on the super high-rise building in the architectural industry of China is late and the technical blanks exist in some construction difficulties in the super high-rise steel structures. Based on the above, a brief analysis and discussion on the difficult construction technology in the steel structures of a super high-rise building and some measures are presented for reference of the relevant personnel in this paper.

  9. The emergence of rural transport strategies in response to rising fuel costs

    International Nuclear Information System (INIS)

    Shapiro, Dana; Pearlmutter, David; Schwartz, Moshe

    2012-01-01

    Rising and sometimes volatile fuel prices pose a challenge for rural organizations reliant on long distance transport. To understand the coping mechanisms used by such organizations, we survey rural business strategies in Israel, where fuel prices are high and urban development is concentrated in the country's geographic center. The businesses surveyed are operated by kibbutzim, historically collective communities that are now in various stages of privatization. Analysis of the ‘transport strategies’ employed by nearly 100 organizations in three regions of varying remoteness and isolation shows that firms rely on distinct strategies such as localization and high value density. Localization was found to be prevalent in all regions, as it requires little capital investment. Strategies exploiting high value density, including information-based services, were prevalent in remote and isolated regions where sensitivity to transport costs is acute. Non-remote firms were less inclined toward strategic adaptation, preferring non-disruptive changes such as cheaper shipping modes. The development implications of these transport strategies are consistent with rural economic trends observed throughout the developed world. If transport costs continue to rise, rural firms may shrink the radius of their sales and labor pools, or search for more lucrative products to reduce their relative transport costs. - Highlights: ► We survey transport strategies used by rural businesses in Israeli kibbutzim. ► The seven distinct strategies identified include localization and value density. ► Localization is used in all regions and value density in remote and isolated regions. ► Development implications are consistent with economic trends in other rural regions. ► Rural firms will likely respond to high fuel costs by strategic transport adaptation.

  10. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  11. Methodology for modular nuclear plant design and construction

    International Nuclear Information System (INIS)

    Lapp, C.W.; Golay, M.

    1992-01-01

    During the past decade, the rising cost of nuclear power plant construction has caused the cancellation of many projects and has forced some utilities into bankruptcy. Many factors have contributed to capital cost increases, including regulatory changes, the absence of standard designs, and low worker productivity. Low worker productivity can be attributed to the conventional building process, which is not conductive to productive labor. This study presents innovative ways to reduce the capital cost of nuclear plants through more efficient construction processes designed to increase worker productivity. A major portion of the plant capital cost is the interest paid during construction on borrowed capital. Modular fabrication could potentially reduce interest payments by compressing the construction schedule of nuclear facilities. Additional cost savings expected from modular designs arise from improved quality, productivity, and schedule control in fabrication of plant elements within a factory environment

  12. 76 FR 49279 - Energy Efficiency Design Standards for New Federal Commercial and Multi-Family High-Rise...

    Science.gov (United States)

    2011-08-10

    ... construction and substantially rehabilitated multifamily high rise buildings in July 2011. The benchmarking... residential buildings is based on an interpolation of a cost study conducted on several building types that...

  13. Assessment of Cost Variation in Solid and Hollow Floor Construction in Lagos State

    Directory of Open Access Journals (Sweden)

    Oluwaseun Sunday Dosumu

    2013-12-01

    Full Text Available The differences in construction methods between different forms of slabs construction tend to result into variation in the cost of the slabs for any building project. Thus, this study aims at assessing the variation in construction cost among various construction methods available for hollow and solid floors in construction projects within Lagos State. The research design for this study was a survey design approach and the population of the study are active professionals (Architects, Civil Engineers, Builders, Quantity Surveyors, Consultant and contractors because they are the major participants in the construction activities of the construction industry in Lagos State, Nigeria. The research is based on 46 returned questionnaires out of the 60 that was administered. The data from the questionnaires were analyzed using descriptive tools such as frequencies, percentage and mean values. The hypotheses were tested with paired sample t-test and it was found that the system or method of slab construction well known to the respondents is cast in situ, precast and semi-precast. The study also shows that the cost of in-situ solid slabs are higher than that of hollow slab which is an indication that solid slab construction is more expensive than hollow slab construction provided the hollow slab is a one-way hollow floor and not waffle floor. In pre cast solid slab construction the cost of transportation of units to sites, cost of expertise required in the construction process and the cost of fabrication off site are the three highest and most expensive aspects of precast solid slab while cost of erection and placement and the cost of grouting and topping if required are less expensive. Therefore there is difference in the cost of construction between the solid and hollow slabs but the difference is not appreciable. The study's major recommendation is that, adequate and careful analysis must be done in the choice of floor system being adopted for any

  14. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthelemy, Michel; Escobar Rangel, Lina

    2013-01-01

    This paper provides the first comparative analysis of nuclear reactor construction costs in France and the United States. Studying the cost of nuclear power has often been a challenge, owing to the lack of reliable data sources and heterogeneity between countries, as well as the long time horizon which requires controlling for input prices and structural changes. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using expected demand variation as an instrument. We argue that benefits from nuclear reactor program standardization can arise through short term coordination gains, when the diversity of nuclear reactors' technologies under construction is low, or through long term benefits from learning spillovers from past reactor construction experience, if those spillovers are limited to similar reactors. We find that overnight construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect-Engineer (A- E). In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. (authors)

  15. User costs as one of main advantages of precast concrete application in highway construction

    Science.gov (United States)

    Tomek, Radan

    2017-09-01

    Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.

  16. An Environmentally Oriented Constructive Cost Model In Information ...

    African Journals Online (AJOL)

    A model was designed to assist software developers in Nigeria to estimate software effort, duration and cost as a result of the difficulties in understanding the parameters of the traditional Constructive Cost Model II (COCOMO II) , which was designed for a specif ic environment, using Source Lines of Code (SLOC) . Results ...

  17. Improvement of Cost Calculation in Constructions – Application of the Standard Cost Method

    Directory of Open Access Journals (Sweden)

    Adela Breuer

    2010-12-01

    Full Text Available Grace to the analysis of several commercial companies effectively performed “on the field”, we could remark the necessity to change the method of cost calculation, our motivation being related to the simplification of calculations and the reduction of the labour volume, but especially the necessity to know in due time the deviations occurred as well as the causes having led to their apparition. The importance of knowing the deviations in due time results from the very basic characteristics of the constructions execution, i.e. the performance of works during several budgetary years, which leads to the modifications of prices and materials, the introduction of new technologies, and to the performance of open air activities, making the execution of constructions works be influenced by the atmospheric condition. But the most important aspect of knowing the deviations is the correct determination of expenses and their inscribing in the corresponding period, in view of determining the result of the budgetary year. Our proposal for the enhancement of the method of cost calculation in constructions is the application of the standard cost method in the variant “single standard cost”.

  18. 19 CFR 351.407 - Calculation of constructed value and cost of production.

    Science.gov (United States)

    2010-04-01

    ... ANTIDUMPING AND COUNTERVAILING DUTIES Calculation of Export Price, Constructed Export Price, Fair Value, and Normal Value § 351.407 Calculation of constructed value and cost of production. (a) Introduction. This... 19 Customs Duties 3 2010-04-01 2010-04-01 false Calculation of constructed value and cost of...

  19. Possibilities of using aluminate cements in high-rise construction

    Science.gov (United States)

    Kaddo, Maria

    2018-03-01

    The article describes preferable ways of usage of alternative binders for high-rise construction based on aluminate cements. Possible areas of rational use of aluminate cements with the purpose of increasing the service life of materials and the adequacy of the durability of materials with the required durability of the building are analyzed. The results of the structure, shrinkage and physical and mechanical properties of concrete obtained from dry mixes on the base of aluminate cements for self-leveling floors are presented. To study the shrinkage mechanism of curing binders and to evaluate the role of evaporation of water in the development of shrinkage was undertaken experiment with simple unfilled systems: gypsum binder, portland cement and «corrosion resistant high alumina cement + gypsum». Principle possibility of binder with compensated shrinkage based on aluminate cement, gypsum and modern superplasticizers was defined, as well as cracking resistance and corrosion resistance provide durability of the composition.

  20. High-Rise Construction in Densely Dwelled Cities: Requirements for Premises Insolation and Consequences of their Violation in Russian Law and Jurisprudence

    Science.gov (United States)

    Gongalo, Boris; Gudovicheva, Lubov; Gubareva, Anna; Dobrynina, Larisa

    2018-03-01

    The issues of constructing high-rise, primarily residential, buildings have a great social significance. Not every plot of land, acquired in the Russian Federation is suitable for high-rise construction. Therefore, every construction company that plans to erect a multi-apartment building, a high-rise office building, or a skyscraper must take into account not only technical norms but as well sanitary legislation regulations that set obligatory requirements about insolation of apartments. The article includes a short study of several norms in the Russian legislation regarding insolation of dwellings; analises the problems of judicial interpretation of the statutory limitations. In this aspect it researches the debatable questions arising in practice of state arbitration courts dealing with the lawsuits on allocation of land-plots by the local administration. The analysis of the judicial practice is followed by description of the difficulties facing the developers of land-plots, concerning the project and territorial planning documentation.

  1. Rising food costs & global food security: Key issues & relevance for India

    Science.gov (United States)

    Gustafson, Daniel J.

    2013-01-01

    Rising food costs can have major impact on vulnerable households, pushing those least able to cope further into poverty and hunger. On the other hand, provided appropriate policies and infrastructure are in place, higher agricultural prices can also raise farmers’ incomes and rural wages, improve rural economies and stimulate investment for longer-term economic growth. High food prices since 2007 have had both short-term impacts and long-term consequences, both good and bad. This article reviews the evidence of how rising costs have affected global food security since the food price crisis of 2007-2008, and their impact on different categories of households and countries. In light of recent studies, we know more about how households, and countries, cope or not with food price shocks but a number of contentious issues remain. These include the adequacy of current estimates and the interpretation of national and household food and nutrition security indicators. India is a particularly important country in this regard, given the high number of food insecure, the relative weight of India in global estimates of food and nutrition insecurity, and the puzzles that remain concerning the country's reported declining per capita calorie consumption. Competing explanations for what is behind it are not in agreement, but these all point to the importance of policy and programme innovation and greater investment necessary to reach the achievable goal of food and nutrition security for all. PMID:24135190

  2. Rising food costs & global food security: Key issues & relevance for India

    Directory of Open Access Journals (Sweden)

    Daniel J Gustafson

    2013-01-01

    Full Text Available Rising food costs can have major impact on vulnerable households, pushing those least able to cope further into poverty and hunger. On the other hand, provided appropriate policies and infrastructure are in place, higher agricultural prices can also raise farmers′ incomes and rural wages, improve rural economies and stimulate investment for longer-term economic growth. High food prices since 2007 have had both short-term impacts and long-term consequences, both good and bad. This article reviews the evidence of how rising costs have affected global food security since the food price crisis of 2007-2008, and their impact on different categories of households and countries. In light of recent studies, we know more about how households, and countries, cope or not with food price shocks but a number of contentious issues remain. These include the adequacy of current estimates and the interpretation of national and household food and nutrition security indicators. India is a particularly important country in this regard, given the high number of food insecure, the relative weight of India in global estimates of food and nutrition insecurity, and the puzzles that remain concerning the country′s reported declining per capita calorie consumption. Competing explanations for what is behind it are not in agreement, but these all point to the importance of policy and programme innovation and greater investment necessary to reach the achievable goal of food and nutrition security for all.

  3. Rising food costs & global food security: key issues & relevance for India.

    Science.gov (United States)

    Gustafson, Daniel J

    2013-09-01

    Rising food costs can have major impact on vulnerable households, pushing those least able to cope further into poverty and hunger. On the other hand, provided appropriate policies and infrastructure are in place, higher agricultural prices can also raise farmers' incomes and rural wages, improve rural economies and stimulate investment for longer-term economic growth. High food prices since 2007 have had both short-term impacts and long-term consequences, both good and bad. This article reviews the evidence of how rising costs have affected global food security since the food price crisis of 2007-2008, and their impact on different categories of households and countries. In light of recent studies, we know more about how households, and countries, cope or not with food price shocks but a number of contentious issues remain. These include the adequacy of current estimates and the interpretation of national and household food and nutrition security indicators. India is a particularly important country in this regard, given the high number of food insecure, the relative weight of India in global estimates of food and nutrition insecurity, and the puzzles that remain concerning the country's reported declining per capita calorie consumption. Competing explanations for what is behind it are not in agreement, but these all point to the importance of policy and programme innovation and greater investment necessary to reach the achievable goal of food and nutrition security for all.

  4. ANN Based Approach for Estimation of Construction Costs of Sports Fields

    Directory of Open Access Journals (Sweden)

    Michał Juszczyk

    2018-01-01

    Full Text Available Cost estimates are essential for the success of construction projects. Neural networks, as the tools of artificial intelligence, offer a significant potential in this field. Applying neural networks, however, requires respective studies due to the specifics of different kinds of facilities. This paper presents the proposal of an approach to the estimation of construction costs of sports fields which is based on neural networks. The general applicability of artificial neural networks in the formulated problem with cost estimation is investigated. An applicability of multilayer perceptron networks is confirmed by the results of the initial training of a set of various artificial neural networks. Moreover, one network was tailored for mapping a relationship between the total cost of construction works and the selected cost predictors which are characteristic of sports fields. Its prediction quality and accuracy were assessed positively. The research results legitimatize the proposed approach.

  5. Modeling of Construction Cost of Villas in Oman

    Directory of Open Access Journals (Sweden)

    MA Al-Mohsin

    2014-06-01

    Full Text Available In this research, a model for estimating construction cost of villas is presented. The model takes into account four major factors affecting villa's cost, namely: built up area, number of toilets, number of bedrooms and the number of stories. A field survey was conducted to collect information required for such model using data collection form designed by the researchers. Information about 150 villas was collected from six well experienced consultants in the field of villa design and supervision in Oman. Collected data was analyzed to develop suggested model which consists of two main levels of estimate. The first level is at the conceptual design stage where the client presents his/her need of space and basic information about the available plot for construction. The second level of cost estimation is carried out after the preliminary design stage where the client has to decide on the finishes and type of structure. At the second level of estimation, the client should be able to decide whether to precede for construction or not, according to his/her budget. The model is general and can be used anywhere and was validated for accepted degree of confidence using the actual cost of the 112 executed villa projects in Oman. The villas included in this study were owned by clients from both high and low income brackets and had different types of finishing material. The developed equations showed good correlation between the selected variables and the actual cost with R2  = 0.79 in the case of conceptual estimate and R2  = 0.601 for preliminary estimate.

  6. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  7. International comparison of economic and technical indexes of nuclear power plant construction

    International Nuclear Information System (INIS)

    Majer, P.; Fialova, H.

    1988-01-01

    The comparison of capital costs of the construction of nuclear power plants takes into consideration the following aspects: the delineation of the installation, the determination of costs and their break-down, the impact of the time factor, the conversion of the costs to a comparable unit. Power plants are always compared with roughly the same power capacity, this even when conditions for construction are not fully comparable. Construction costs may be divided into, e.g., pre-construction costs, direct capital costs, indirect capital costs, interest during construction. The time factor is manifest in the duration of construction and in the concrete year of construction for which the comparison is being made. The inflationary rise in prices and interests are increasing capital costs by roughly 5 - 8% per annum. The comparison of costs expressed in different currencies is made either by conversion using the rate of exchange or by comparing the time expended for the construction of the power plant. Various methods of comparison are discussed. (J.B.). 7 refs

  8. Canadian nuclear power plant construction cost forecast and analysis

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequence of the decision as possible. This understanding must be provided by the evaluation of the situation to take place in the future. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A data base is built and indexes are prepared. Based on these indexes an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of forty years are generated and applications of alternative scenario forecasts and range forecasts to uncertainty assessment are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the very first ever done for Canadian NGS constructions

  9. Problems of natural lighting for deepened buildings and underground premises under screen effect of high-rise construction

    Directory of Open Access Journals (Sweden)

    Larionova Kira

    2018-01-01

    Full Text Available The main rationale and objective of the submitted research work is to create a quality lighting environment in the premises of deepened buildings and below-ground structures under screen effect of high-rise construction (high-rise buildings. It is noted, that in modern megapolises, a deficiency of vacant urban territories leads to the increased density of urban development with increased amount of high-rise construction and tendency to increase efficiency in the use of underground space. The natural lighting of premises in underground buildings and structures is the most efficient way, but it can be implemented only under use of roof lighting system in the form of roof monitors or skylights. In this case the levels of indoor natural lighting will be affected with serious screening effect of high-rise buildings in surrounding development. Such an situation is not regulated, or even considered by the contemporary building Codes and Regulations on natural lighting of interiors. The authors offered a new formula for a daylight factor calculation with roof lighting system in the described cases. The results of theoretical calculations and experimental studies showed very similar values. This proved the truth of the offered formula and elaborated method of calculation on the basis of an offered hypothesis. It prooves, that it is possible to use some factor and guide points in the daylight factors design under system of side natural lighting in the same design for a system of roof lighting.

  10. Problems of natural lighting for deepened buildings and underground premises under screen effect of high-rise construction

    Science.gov (United States)

    Larionova, Kira; Stetsky, Sergey

    2018-03-01

    The main rationale and objective of the submitted research work is to create a quality lighting environment in the premises of deepened buildings and below-ground structures under screen effect of high-rise construction (high-rise buildings). It is noted, that in modern megapolises, a deficiency of vacant urban territories leads to the increased density of urban development with increased amount of high-rise construction and tendency to increase efficiency in the use of underground space. The natural lighting of premises in underground buildings and structures is the most efficient way, but it can be implemented only under use of roof lighting system in the form of roof monitors or skylights. In this case the levels of indoor natural lighting will be affected with serious screening effect of high-rise buildings in surrounding development. Such an situation is not regulated, or even considered by the contemporary building Codes and Regulations on natural lighting of interiors. The authors offered a new formula for a daylight factor calculation with roof lighting system in the described cases. The results of theoretical calculations and experimental studies showed very similar values. This proved the truth of the offered formula and elaborated method of calculation on the basis of an offered hypothesis. It prooves, that it is possible to use some factor and guide points in the daylight factors design under system of side natural lighting in the same design for a system of roof lighting.

  11. Cost effectiveness of DH-network construction. Final report; Kaukolaempoeverkon rakentamisen kehittaeminen; Loppuraportti

    Energy Technology Data Exchange (ETDEWEB)

    Kivistoe, V.M. [Ekono Energy Ltd, Espoo (Finland)

    1993-12-31

    Construction cost of DH networks were analyzed in the study. Basing on the analysis, those areas of construction activities were selected, where cost effectiveness could be improved. According to the study, the civil works` cost form about half of the total construction cost on small diameter networks and 30..40 % of the cost of larger sizes. The impact of the design on the construction cost should be emphasized. According to the study it is possible to find significant reduction in the construction cost by increased use of twin pipe where the both carrier pipes are included in the same insulation casing. In small network sizes the reduction of cost achievable by the above is about 30..35 % and in larger sizes about 10 % (DN 125..DN 200) when comparing with a design by individual pipes. The use of twin pipe also causes savings in thermal loss. In sizes DN 65 and up, the saving in heat loss is about 90..95 FIM/m which represents about half of the total savings when compared with design by individual pipes. The possibility of prestressing the twin pipe element at factory in order to shorten the installation time at site was also studied and test pipes was also done. By factory prestressing it would be possible to avoid preheating of pipes at construction site. The trench could be backfilled immediately after pipe laying, welding and inspections. Theoretically and based on test pipes done the prestressing of twin pipe element looks very promising. When factory prestressing would be used, the open time of the trench is reduced significantly and for instance the disturbance to traffic is smaller. As well the use of labour and machinery at site could be more effective

  12. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  13. Improving of the monolithic foamconcrete quality for used in the high-rise constructions

    Science.gov (United States)

    Sychova, Anastasia; Solomahin, Andrey; Kotovich, Vitaliy; Svatovskaya, Larisa; Kamenev, Yuriy

    2018-03-01

    The article is devoted to the problem of obtaining the desired rheological characteristics of the foamconcrete when transporting it by the feeding pipelines to the place of installation in high-rise construction. The dependence of the density change of foamconcrete on the height to which it is transported is shown. It is stated that the use of stabilizers for the foam, as well as certain mechanisms of stabilization results in the concrete mix of the required density. To assess the rheological properties of the concrete mix the coefficient of volumetric relaxation is proposed.

  14. Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Gilbert, Alex; Nugent, Daniel

    2014-01-01

    This study investigates the frequency and magnitude of cost and time overruns occurring during the construction of 401 electricity projects built between 1936 and 2014 in 57 countries. In aggregate, these projects required approximately $820 billion in investment, and amounted to 325,515 MW of installed capacity and 8495 km of transmission lines. We use this sample of projects to test six hypotheses about construction cost overruns related to (1) diseconomies of scale, (2) project delays, (3) technological learning, (4) regulation and markets, (5) decentralization and modularity, and (6) normalization of results to scale. We find that nuclear reactors are the riskiest technology in terms of mean cost escalation as a percentage of budget and frequency; that hydroelectric dams stand apart for their mean cost escalation in total dollars; that many of the hypotheses grounded in the literature appear wrong; and that financing, partnerships, modularity, and accountability may have more to do with overruns than technology. - Highlights: • Many hypotheses about construction overruns grounded in the literature appear wrong. • Nuclear reactors are the most prone to cost overruns as a percentage of budget and frequency. • Hydroelectric dams stand apart for their mean cost escalation in total dollars. • Solar and wind energy systems are least at risk to cost overruns

  15. Determining the market value of high-rise residential buildings based on evaluation of consumer properties

    Directory of Open Access Journals (Sweden)

    Kolobova Svetlana

    2018-01-01

    Full Text Available As you know, high-rise construction is an indicator of the practical implementation of advanced innovative technologies in the construction industry of the country. High-rise building inevitably comes to the big cities, in connection with the shortage and value of land. The life cycle of any construction project, including high-rise buildings consists of chains: of engineering survey - design-construction-operation. In the process of operation of a tall building, decisions about major repairs or reconstruction of a building are made for decision-making on further use. This article describes methods of assessing the consumer quality of high-rise residential buildings and the establishment of prices based on consumer characteristics of a tall residential building. It is proposed to assess the premises under their quality characteristics. The study was conducted to establish the influence of individual, comprehensive and integral indicators of comparable quality for effective quality living spaces. Simultaneously, there was established a relationship of quality with the consumer cost of housing, ultimately with the potential needs of owners, tenants of the home, lessor dwelling, or buyers of residential properties and other participants in the residential real estate market. This relationship further creates consumer requirements to quality standard of premises at a certain stage of socio-economic development.

  16. Determining the market value of high-rise residential buildings based on evaluation of consumer properties

    Science.gov (United States)

    Kolobova, Svetlana

    2018-03-01

    As you know, high-rise construction is an indicator of the practical implementation of advanced innovative technologies in the construction industry of the country. High-rise building inevitably comes to the big cities, in connection with the shortage and value of land. The life cycle of any construction project, including high-rise buildings consists of chains: of engineering survey - design-construction-operation. In the process of operation of a tall building, decisions about major repairs or reconstruction of a building are made for decision-making on further use. This article describes methods of assessing the consumer quality of high-rise residential buildings and the establishment of prices based on consumer characteristics of a tall residential building. It is proposed to assess the premises under their quality characteristics. The study was conducted to establish the influence of individual, comprehensive and integral indicators of comparable quality for effective quality living spaces. Simultaneously, there was established a relationship of quality with the consumer cost of housing, ultimately with the potential needs of owners, tenants of the home, lessor dwelling, or buyers of residential properties and other participants in the residential real estate market. This relationship further creates consumer requirements to quality standard of premises at a certain stage of socio-economic development.

  17. Construction of VLCC marine oil storage cost index system

    Science.gov (United States)

    Li, Yuan; Li, Yule; Lu, Jinshu; Wu, Wenfeng; Zhu, Faxin; Chen, Tian; Qin, Beichen

    2018-04-01

    VLCC as the research object, the basic knowledge of VLCC is summarized. According to the phenomenon that VLCC is applied to offshore oil storage gradually, this paper applies the theoretical analysis method to analyze the excess capacity from VLCC, the drop of oil price, the aging VLCC is more suitable for offshore storage The paper analyzes the reason of VLCC offshore oil storage from three aspects, analyzes the cost of VLCC offshore storage from the aspects of manpower cost and shipping cost, and constructs the cost index system of VLCC offshore oil storage.

  18. CONSTRUCTION OF A DIFFERENTIAL ISOTHERMAL CALORIMETER OF HIGH SENSITIVITY AND LOW COST.

    OpenAIRE

    Trinca, RB; Perles, CE; Volpe, PLO

    2009-01-01

    CONSTRUCTION OF A DIFFERENTIAL ISOTHERMAL CALORIMETER OF HIGH SENSITIVITY AND LOW COST The high cost of sensitivity commercial calorimeters may represent an obstacle for many calorimetric research groups. This work describes (fie construction and calibration of a batch differential heat conduction calorimeter with sample cells volumes of about 400 mu L. The calorimeter was built using two small high sensibility square Peltier thermoelectric sensors and the total cost was estimated to be about...

  19. Increased costs to US pavement infrastructure from future temperature rise

    Science.gov (United States)

    Underwood, B. Shane; Guido, Zack; Gudipudi, Padmini; Feinberg, Yarden

    2017-10-01

    Roadway design aims to maximize functionality, safety, and longevity. The materials used for construction, however, are often selected on the assumption of a stationary climate. Anthropogenic climate change may therefore result in rapid infrastructure failure and, consequently, increased maintenance costs, particularly for paved roads where temperature is a key determinant for material selection. Here, we examine the economic costs of projected temperature changes on asphalt roads across the contiguous United States using an ensemble of 19 global climate models forced with RCP 4.5 and 8.5 scenarios. Over the past 20 years, stationary assumptions have resulted in incorrect material selection for 35% of 799 observed locations. With warming temperatures, maintaining the standard practice for material selection is estimated to add approximately US$13.6, US$19.0 and US$21.8 billion to pavement costs by 2010, 2040 and 2070 under RCP4.5, respectively, increasing to US$14.5, US$26.3 and US$35.8 for RCP8.5. These costs will disproportionately affect local municipalities that have fewer resources to mitigate impacts. Failing to update engineering standards of practice in light of climate change therefore significantly threatens pavement infrastructure in the United States.

  20. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  1. Construction and demolition waste generation rates for high-rise buildings in Malaysia.

    Science.gov (United States)

    Mah, Chooi Mei; Fujiwara, Takeshi; Ho, Chin Siong

    2016-12-01

    Construction and demolition waste continues to sharply increase in step with the economic growth of less developed countries. Though the construction industry is large, it is composed of small firms with individual waste management practices, often leading to the deleterious environmental outcomes. Quantifying construction and demolition waste generation allows policy makers and stakeholders to understand the true internal and external costs of construction, providing a necessary foundation for waste management planning that may overcome deleterious environmental outcomes and may be both economically and environmentally optimal. This study offers a theoretical method for estimating the construction and demolition project waste generation rate by utilising available data, including waste disposal truck size and number, and waste volume and composition. This method is proposed as a less burdensome and more broadly applicable alternative, in contrast to waste estimation by on-site hand sorting and weighing. The developed method is applied to 11 projects across Malaysia as the case study. This study quantifies waste generation rate and illustrates the construction method in influencing the waste generation rate, estimating that the conventional construction method has a waste generation rate of 9.88 t 100 m -2 , the mixed-construction method has a waste generation rate of 3.29 t 100 m -2 , and demolition projects have a waste generation rate of 104.28 t 100 m -2 . © The Author(s) 2016.

  2. Dynamic cost control information system for nuclear power plant construction

    International Nuclear Information System (INIS)

    Wang Yongqing; Liu Wei

    1998-01-01

    The authors first introduce the cost control functions of some overseas popular project management software at present and the specific ways of cost control of nuclear power plant construction in China. Then the authors stress the necessity of cost and schedule control integration and present the concept of dynamic cost control, the design scheme of dynamic cost control information system and the data structure modeling. Based on the above, the authors can develop the system which has the functions of dynamic estimate, cash flow management and cost optimization for nuclear engineering

  3. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  4. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    Directory of Open Access Journals (Sweden)

    Iakymchuk Iryna M.

    2017-09-01

    Full Text Available The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiveness of innovation project by providing cost-management services at all stages of investment project, identifying opportunities for reducing them, thereby contributing to sustainable development of construction organization over time. It has been concluded that the more specific the program of activities of construction organization, the more accurate the process of identification of costs becomes, the more efficient is the management of costs, targeted at saving resources, reducing the self cost of construction works.

  5. Construction costs, payback times, and the leaf economics of carnivorous plants.

    Science.gov (United States)

    Karagatzides, Jim D; Ellison, Aaron M

    2009-09-01

    Understanding how different plant species and functional types "invest" carbon and nutrients is a major goal of plant ecologists. Two measures of such investments are "construction costs" (carbon needed to produce each gram of tissue) and associated "payback times" for photosynthesis to recover construction costs. These measurements integrate among traits used to assess leaf-trait scaling relationships. Carnivorous plants are model systems for examining mechanisms of leaf-trait coordination, but no studies have measured simultaneously construction costs of carnivorous traps and their photosynthetic rates to determine payback times of traps. We measured mass-based construction costs (CC(mass)) and photosynthesis (A(mass)) for traps, leaves, roots, and rhizomes of 15 carnivorous plant species grown under greenhouse conditions. There were highly significant differences among species in CC(mass) for each structure. Mean CC(mass) of carnivorous traps (1.14 ± 0.24 g glucose/g dry mass) was significantly lower than CC(mass) of leaves of 267 noncarnivorous plant species (1.47 ± 0.17), but all carnivorous plants examined had very low A(mass) and thus, long payback times (495-1551 h). Our results provide the first clear estimates of the marginal benefits of botanical carnivory and place carnivorous plants at the "slow and tough" end of the universal spectrum of leaf traits.

  6. Preventable Complications Driving Rising Costs in Management of Patients with Critical Limb Ischemia.

    Science.gov (United States)

    Dua, Anahita; Desai, Sapan S; Patel, Bhavin; Seabrook, Gary R; Brown, Kellie R; Lewis, Brian; Rossi, Peter J; Malinowski, Michael; Lee, Cheong J

    2016-05-01

    This study aimed to identify factors that drive increasing health-care costs associated with the management of critical limb ischemia in elective inpatients. Patients with a primary diagnosis code of critical limb ischemia (CLI) were identified from the 2001-2011 Nationwide Inpatient Sample. Demographics, CLI management, comorbidities, complications (bleeding, surgical site infection [SSI]), length of stay, and median in-hospital costs were reviewed. Statistical analysis was completed using Students' t-test and Mann-Kendall trend analysis. Costs are reported in 2011 US dollars corrected using the consumer price index. From 2001 to 2011, there were a total of 451,823 patients who underwent open elective revascularization as inpatients for CLI. Costs to treat CLI increased by 63% ($12,560 in 2001 to $20,517 in 2011, P cost of care. From 2001 to 2011, the number of patient comorbidities (7.56-12.40) and percentage of endovascular cases (13.4% to 27.4%) increased, accounting for a 6% annual increase in total cost despite decreased median length of stay (6 to 5 days). Patients who developed SSI had total costs 83% greater than patients without SSIs ($30,949 vs. $16,939; P costs 41% greater than nonbleeding patients ($23,779 vs. $16,821, P cost of CLI treatment is increasing and driven by rising endovascular use, SSI, and bleeding in the in-patient population. Further efforts to reduce complications in this patient population may contribute to a reduction in health care-associated costs of treating CLI. Copyright © 2016 Elsevier Inc. All rights reserved.

  7. REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Mladen Zelenika

    1998-12-01

    Full Text Available A Contractor usually utilizes the available drilling equipment when constructing just one single well. Drilling cost and time consumption in constructing the well MB-1, using the percussion method, and the well MB-2, using the conventional rotary drilling method, call for a separate analysis in order to justify the investment cost for the acquisition of additional equipment for a single well only. The wells, located in a karst vrtača close to an estavelle near Tomislavgrad, with a diameter of 500 mm and approximately 80 m deep, have been accomplished with a low rate of penetration using the conventional Cable tool and resp. Rotary Drilling Method. In this paper results of analyses for the given circumstances are shown: both the efficiency and cost of the mentioned drilling methods performed by the crews of »Geotehnika d.d.« Zagreb, as well as the justifiability of investments in new equipment are evaluated.

  8. Efficiency and cost effectiveness of retrofitting ventilation in low-rise housing

    International Nuclear Information System (INIS)

    Bowser, D.; Fugler, D.

    2000-01-01

    Effective and inexpensive ventilation systems that can be retrofitted to existing low-rise housing to improve indoor air quality in existing housing stock is discussed. In a project by CMHC ten retrofit ventilation systems in single family residential buildings were tested in an effort to identify homes with specific indoor air quality concerns and to evaluate the performance of these retrofit systems by monitoring air quality before and after installation. Measurements were taken over a two-to-three day period with normal occupancy. In one case radon contamination was also measured directly before and after the retrofit. Cost estimates were based on capital, operating and maintenance expenses. This paper describes the results of three sample case studies. One of these involved a home with high concentration of radon gas. The recommended solution was fan-assisted removal of soil gases as the only way to ensure substantial reductions in concentration. Cost of the system was $2,450, plus $79 annual operating expenses. The second case involved a basement apartment with odour and moisture build-up. To solve the problem, an exhaust-only ventilation system with multiple pick-up points was installed at a cost of $750. Annual operating costs are estimated at $171. The third case study described a dwelling with windows and exhaust ducts showing condensation and mold on the bathroom ceiling. Balanced mechanical ventilation via an HRV was installed to exhaust the moist air from the house and to supply fresh dry air. In this case cost of the system was $1,345 installed, plus annual operating costs of $117. It was stressed that different houses have different requirements. Therefore it is important to be fully aware of the amount of natural ventilation a house has, prior to determining whether the solution demands additional ventilation requirements or simply redistribution. 1 ref., 3 figs

  9. Intumescent coatings with improved properties for high-rise construction

    Science.gov (United States)

    Ustinov, Andrey; Zybina, Olga; Tanklevsky, Leonid; Lebedev, Vasily; Andreev, Andrey

    2018-03-01

    The paper overviews the way of creating intumescent fire-protective compositions with improved properties by adding nano-and micro-sized supplements into them. Intumescent paints are inert at low temperatures, and at higher temperatures they expand and degrade to provide a charred layer of low conductivity materials. The modified intumescent paints are able to form a more stable charred layer than the classical paints. The stability of a charred layer is crucial if the fire safety in high-rise construction must be secured, because a weak charred layer will not provide a required fire endurance for steel bearing structures and they will break down in case of fire. The fire-protective properties of modified intumescent paints were estimated using an electrical furnace. Also the way of thermal decomposition of the paints was studied with thermogravimetric analysis. Results show that modified intumescent paints form a charred layer with improved fire-protective properties; it can serve as a thermal barrier for a longer period of time. Thermogravimetric analysis confirms this fact showing that the temperatures of full thermal decay in case of modified paints are higher than those of non-modified paints.

  10. A Refined Basket of Goods Approach for Comparing Construction Costs between Countries

    Directory of Open Access Journals (Sweden)

    Rick Best

    2012-11-01

    Full Text Available Most comparisons of construction industry performance requirethat construction costs be converted to a common base. Existingmechanisms for such conversions produce unreliable results.A proposed method for producing industry-specifi c conversionfactors was tested using a single building type. A basket ofmaterials and labour was identifi ed and weighted to refl ect the costshare of each item in a completed project. Prices for the basketwere gathered in three cities and simple construction specifi cconversion indices were calculated based on the constructionpurchasing power of each currency. The construction purchasingpower parities (CPPPs showed marked differences from otheravailable conversion mechanisms such as exchange rates andgeneral purchasing power parities (PPPs that have been used inprevious international comparison studies. While the study waslimited in scope, and is only the fi rst stage of a longer process, thesubstantial differences in comparative costs based on purchasingpower illustrate the problems inherent in international costcomparisons. For example, comparing Singapore and Sydney,Singapore costs appear to be only 40% of those in Sydney (basedon exchange rates about two-thirds the cost of Sydney (usinggeneral PPPs or almost the same (using the preliminary CPPPs.These results illustrate the problems of converting costs fromlocal currencies to a single base currency and suggest that furtherdevelopment is needed to improve the reliability of outcomes.

  11. The substantiation of methodical instrumentation to increase the tempo of high-rise construction in region

    Science.gov (United States)

    Belyaeva, Svetlana; Makeeva, Tatyana; Chugunov, Andrei; Andreeva, Peraskovya

    2018-03-01

    One of the important conditions of effective renovation of accommodation in region on the base of realization of high-rise construction projects is attraction of investments by forming favorable investment climate, as well as reduction if administrative barriers in construction and update of main funds of housing and communal services. The article proposes methodological bases for assessing the state of the investment climate in the region, as well as the methodology for the formation and evaluation of the investment program of the housing and communal services enterprise. The proposed methodologies are tested on the example of the Voronezh region. Authors also showed the necessity and expediency of using the consulting mechanism in the development of state and non-state investment projects and programs.

  12. The substantiation of methodical instrumentation to increase the tempo of high-rise construction in region

    Directory of Open Access Journals (Sweden)

    Belyaeva Svetlana

    2018-01-01

    Full Text Available One of the important conditions of effective renovation of accommodation in region on the base of realization of high-rise construction projects is attraction of investments by forming favorable investment climate, as well as reduction if administrative barriers in construction and update of main funds of housing and communal services. The article proposes methodological bases for assessing the state of the investment climate in the region, as well as the methodology for the formation and evaluation of the investment program of the housing and communal services enterprise. The proposed methodologies are tested on the example of the Voronezh region. Authors also showed the necessity and expediency of using the consulting mechanism in the development of state and non-state investment projects and programs.

  13. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  14. Cost viability of 3D printed house in UK

    Science.gov (United States)

    Tobi, A. L. Mohd; Omar, S. A.; Yehia, Z.; Al-Ojaili, S.; Hashim, A.; Orhan, O.

    2018-03-01

    UK has been facing housing crisis due to the rising price of the property on sale. This paper will look into the viability of 3D printing technology as an alternative way for house construction on UK. The analysis will be carried out based on the data until the year of 2014 due to limited resources availability. Details cost breakdown on average size house construction cost in UK were analysed and relate to the cost viability of 3D printing technology in reducing the house price in UK. It is found that the 3D printing generates saving of up to around 35% out of total house price in UK. This cost saving comes from the 3D printed construction of walls and foundations for material and labour cost.

  15. CANDU 9 - reducing capital costs through advanced construction

    International Nuclear Information System (INIS)

    Hedges, K.; Yu, S.; Hopwood, J.

    1996-01-01

    Reducing costs is a clear priority in nuclear markets where capital reaches billions and financing is hard-won. To address that priority, AECL introduced the use of advanced construction techniques. This has been one of the key thrusts behind its development of CANDU 9. (author)

  16. To the problem of ensuring stability of activities of construction companies engaged in high-rise building construction

    Science.gov (United States)

    Ivanov, Nikolay; Safe Aldeen, Ahmed

    2018-03-01

    Recently, more and more attention in scientific literature has been drawn to improving the sustainability of organization. The growth in the volume of high-rise construction in Russia makes the task of assessing and ensuring the sustainability of organizations and enterprises leading this type of construction very relevant. The article considers the approach to assessing the sustainability of the organization's activities in the context of functioning of quality management system (QMS). It puts forward the hypothesis that assessment of sustainability of an organization that has a real and efficient functioning quality management system can be based on the results of assessing the effectiveness of the QMS. The article describes in sufficient detail the sequence of actions to form a list of criteria for assessing the effectiveness of the QMS and sustainability of the organization, and to evaluate both characteristics on the basis of these criteria. For a clear interpretation of the results obtained, the authors use so-called petal diagrams. It suggests an original approach to their creation and analysis. Based on the results of the study, the authors conclude that in order to assess the sustainability of enterprises and organizations analysis of the dynamics of changes in the basic sustainability factors is mandatory.

  17. External risk factors affecting construction costs

    Science.gov (United States)

    Mubarak, Husin, Saiful; Oktaviati, Mutia

    2017-11-01

    Some risk factors can have impacts on the cost, time, and performance. Results of previous studies indicated that the external conditions are among the factors which give effect to the contractor in the completion of the project. The analysis in the study carried out by considering the conditions of the project in the last 15 years in Aceh province, divided into military conflict phase (2000-2004), post tsunami disaster rehabilitation and reconstruction phase (2005-2009), and post-rehabilitation and reconstruction phase (2010-present). This study intended to analyze the impact of external risk factors, primarily related to the impact on project costs and to investigate the influence of the risk factors and construction phases impacted the project cost. Data was collected by using a questionnaire distributed in 15 large companies qualification contractors in Aceh province. Factors analyzed consisted of socio-political, government policies, natural disasters, and monetary conditions. Data were analyzed using statistical application of severity index to measure the level of risk impact. The analysis results presented the tendency of impact on cost can generally be classified as low. There is only one variable classified as high-impact, variable `fuel price increases', which appear on the military conflict and post tsunami disaster rehabilitation and reconstruction periods. The risk impact on costs from the factors and variables classified with high intensity needs a serious attention, especially when the high level impact is followed by the high frequency of occurrences.

  18. Forecasting Construction Cost Index based on visibility graph: A network approach

    Science.gov (United States)

    Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong

    2018-03-01

    Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.

  19. Evaluation of ways and procedures to reduce construction cost and increase competition.

    Science.gov (United States)

    2009-01-01

    Construction cost inflation is affecting many state highway agencies including the Texas Department of : Transportation While some of this increase can be attributed to factors such as soaring cost of energy, : reports of large variations in cost of ...

  20. Planning of Low-rise Urban Housing Areas

    DEFF Research Database (Denmark)

    Svensson, O.

    In many countries industrialization of house building has led to the building of large, monotonous housing areas with high-rise construction. In Denmark, however, smaller, varied housing areas with low-rise construction and urban features have become predominant. This report contains guidelines...... for the planning of such housing areas....

  1. Waste generated in high-rise buildings construction: a quantification model based on statistical multiple regression.

    Science.gov (United States)

    Parisi Kern, Andrea; Ferreira Dias, Michele; Piva Kulakowski, Marlova; Paulo Gomes, Luciana

    2015-05-01

    Reducing construction waste is becoming a key environmental issue in the construction industry. The quantification of waste generation rates in the construction sector is an invaluable management tool in supporting mitigation actions. However, the quantification of waste can be a difficult process because of the specific characteristics and the wide range of materials used in different construction projects. Large variations are observed in the methods used to predict the amount of waste generated because of the range of variables involved in construction processes and the different contexts in which these methods are employed. This paper proposes a statistical model to determine the amount of waste generated in the construction of high-rise buildings by assessing the influence of design process and production system, often mentioned as the major culprits behind the generation of waste in construction. Multiple regression was used to conduct a case study based on multiple sources of data of eighteen residential buildings. The resulting statistical model produced dependent (i.e. amount of waste generated) and independent variables associated with the design and the production system used. The best regression model obtained from the sample data resulted in an adjusted R(2) value of 0.694, which means that it predicts approximately 69% of the factors involved in the generation of waste in similar constructions. Most independent variables showed a low determination coefficient when assessed in isolation, which emphasizes the importance of assessing their joint influence on the response (dependent) variable. Copyright © 2015 Elsevier Ltd. All rights reserved.

  2. LHC Civil Engineering Construction Contracts Cost Monitoring and Budget Forecasting

    CERN Document Server

    Skelton, K

    2000-01-01

    The Civil Engineering project for the LHC is estimated at 350 MCHF, of which about 316 MCHF is for the construction contracts. These contracts are based on a system of remeasurement whereby the consultant estimates the quantities required for the construction of each structure and the contractor commits himself to the unit price, which define the initial tender price. There are many factors that affect the final price for these contracts, from increases or decreases in quantities of the estimated amounts in the original bill of quantities to variations to the contract. This paper will look at how these factors change costs at the individual level of a structure to the overall costs of the contract. It will look at how the Civil Engineering Group monitors these changes to calculate cash flows and final costs and how this information is used as a basis for budget forecasts.

  3. Cost estimates for nuclear power in the UK

    International Nuclear Information System (INIS)

    Harris, Grant; Heptonstall, Phil; Gross, Robert; Handley, David

    2013-01-01

    Current UK Government support for nuclear power has in part been informed by cost estimates that suggest that electricity from new nuclear power stations will be competitive with alternative low carbon generation options. The evidence and analysis presented in this paper suggests that the capital cost estimates for nuclear power that are being used to inform these projections rely on costs escalating over the pre-construction and construction phase of the new build programme at a level significantly below those that have been experienced by past US and European programmes. This paper applies observed construction time and cost escalation rates to the published estimates of capital costs for new nuclear plant in the UK and calculates the potential impact on levelised cost per unit of electricity produced. The results suggest that levelised cost may turn out to be significantly higher than expected which in turn has important implications for policy, both in general terms of the potential costs to consumers and more specifically for negotiations around the level of policy support and contractual arrangements offered to individual projects through the proposed contract for difference strike price. -- Highlights: •Nuclear power projects costs can rise substantially during the construction period. •Pre-construction and construction time can be much longer than anticipated. •Adjusting estimates for observed experience increases levelised costs significantly. •Higher costs suggest that more policy support than envisaged may be required

  4. Use of cost-effective construction technologies in India to mitigate climate change

    Energy Technology Data Exchange (ETDEWEB)

    Sengupta, N. [Forum of Scientists, Engineers and Technologists, Kolkata (India)

    2008-01-10

    Concentration of greenhouse gases plays a major role in raising the earth's temperature. Carbon dioxide, produced from burning of fossil fuels, is the principle greenhouse gas and efforts are being made at international level to reduce its emission through adoption of energy-efficient technologies. The UN Conference on Environment and Development, 1992 made a significant development in this field by initiating the discussion on sustainable development under the Agenda 21. Cost-effective construction technologies can bring down the embodied energy level associated with production of building materials by lowering use of energy-consuming materials. This embodied energy is a crucial factor for sustainable construction practices and effective reduction of the same would contribute in mitigating global warming. The cost-effective construction technologies would emerge as the most acceptable case of sustainable technologies in India both in terms of cost and environment.

  5. Estimation of erosion-accumulative processes at the Inia River's mouth near high-rise construction zones.

    Science.gov (United States)

    Sineeva, Natalya

    2018-03-01

    Our study relevance is due to the increasing man-made impact on water bodies and associated land resources within the urban areas, as a consequence, by a change in the morphology and dynamics of Rivers' canals. This leads to the need to predict the development of erosion-accumulation processes, especially within the built-up urban areas. Purpose of the study is to develop programs on the assessment of erosion-accumulation processes at a water body, a mouth area of the Inia River, in the of perspective high-rise construction zone of a residential microdistrict, the place, where floodplain-channel complex is intensively expected to develop. Results of the study: Within the velocities of the water flow comparing, full-scale measured conditions, and calculated from the model, a slight discrepancy was recorded. This allows us to say that the numerical model reliably describes the physical processes developing in the River. The carried out calculations to assess the direction and intensity of the channel re-formations, made us possible to conclude, there was an insignificant predominance of erosion processes over the accumulative ones on the undeveloped part of the Inia River (the processes activity is noticeable only in certain areas (by the coasts and the island)). Importance of the study: The study on the erosion-accumulation processes evaluation can be used in design decisions for the future high-rise construction of this territory, which will increase their economic efficiency.

  6. Probabilistic prediction of expected ground condition and construction time and costs in road tunnels

    Directory of Open Access Journals (Sweden)

    A. Mahmoodzadeh

    2016-10-01

    Full Text Available Ground condition and construction (excavation and support time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding.

  7. Low cost construction technologies and materials - case study Mozambuique

    CSIR Research Space (South Africa)

    Kuchena, JC

    2009-09-01

    Full Text Available Low cost or affordable construction technologies and materials are often touted as a panacea in meeting the ever growing demand for rapid housing delivery in developing economies. Mozambique as with most of the developing world, from both historical...

  8. Identification of Key Indicators for Sustainable Construction Materials

    Directory of Open Access Journals (Sweden)

    Humphrey Danso

    2018-01-01

    Full Text Available Studies on sustainable construction materials are on the rise with their environmental, social, and economic benefits. This study identifies the key indicators for measuring sustainable construction materials. The design used for the study was that of a survey which relied on a questionnaire with five-point Likert scale to generate data for the analysis. For this purpose, 25 indicators from the three dimensions (environmental, social, and economic identified from the literature were presented to the respondents in a structured questionnaire, and responses were collected and analysed using SPSS. The study identified three key environmental indicators for measuring sustainable construction materials, and these indicators are human toxicity, climate change, and solid waste. Furthermore, adaptability, thermal comfort, local resources, and housing for all were identified as the four key social indicators for sustainable construction materials. In addition, maintenance cost, operational cost, initial cost, long-term savings, and life span were found to be the five key economic indicators for measuring sustainable construction materials. The study therefore suggests that these twelve indicators should be considered in future studies that seek to measure sustainable construction materials.

  9. The rise of low-cost sensing for managing air pollution in cities.

    Science.gov (United States)

    Kumar, Prashant; Morawska, Lidia; Martani, Claudio; Biskos, George; Neophytou, Marina; Di Sabatino, Silvana; Bell, Margaret; Norford, Leslie; Britter, Rex

    2015-02-01

    Ever growing populations in cities are associated with a major increase in road vehicles and air pollution. The overall high levels of urban air pollution have been shown to be of a significant risk to city dwellers. However, the impacts of very high but temporally and spatially restricted pollution, and thus exposure, are still poorly understood. Conventional approaches to air quality monitoring are based on networks of static and sparse measurement stations. However, these are prohibitively expensive to capture tempo-spatial heterogeneity and identify pollution hotspots, which is required for the development of robust real-time strategies for exposure control. Current progress in developing low-cost micro-scale sensing technology is radically changing the conventional approach to allow real-time information in a capillary form. But the question remains whether there is value in the less accurate data they generate. This article illustrates the drivers behind current rises in the use of low-cost sensors for air pollution management in cities, while addressing the major challenges for their effective implementation. Copyright © 2014 Elsevier Ltd. All rights reserved.

  10. The integration of price/cost modelling and construction planning - the automated generation of construc­tion operation

    Directory of Open Access Journals (Sweden)

    P. A. Bowen

    1997-07-01

    Full Text Available The fact that traditional price/cost models are unrelated to the construction process renders them largely unsuited to the provision of meaningful price/cost advice. The nature and lengthiness of the construction planning process has precluded its incorporation into price/cost modelling during the pre-tender phase of the traditional building procurement process. The nub of the modelling problem has been how to integrate the complex process of construction planning into the pre-tender price/cost modelling process. In this paper the authors propose the synthesis of artificial intelligence techniques and construction planning techniques, resulting in a conceptual framework for a network-based cost modelling system for use by quantity surveyors in the cost modelling of buildings.

  11. Formation and maintenance of the territorial balance in the conditions of high-rise construction in the city

    Science.gov (United States)

    Kisel, Tatiana

    2018-03-01

    High-rise construction results in the need of planning of infrastructure facilities, taking into account the increase in loading, as high-rise construction allows to place considerably bigger number of residents in the limited territory. For this purpose it is necessary to estimate the required and actual level of providing the population with each particular type of the facilities of social infrastructure. The compliance of required and actual level of providing can be characterized as the territorial balance, while the discrepancy acts as the territorial imbalance. The article is devoted to the development of such instruments of planning of urban development, which will allow to create the qualitative urban environment, founded on the territorial balances. Namely, it is devoted to the calculation of level of providing the population with the facilities of social infrastructure, to the determination of level of the imbalance in absolute and relative units and also to the ranging of imbalances on urgency of their elimination. The size of the imbalance is of great importance for planning and realization of managerial influences from the executive authorities, operating the city development. In order to determine the urgency of realization of actions for the construction of facilities of social infrastructure it is offered to range the imbalances according to their size, having determined the deviation size from balance, which is so insignificant that it does not demand any managerial influences (it can be characterized as balance) and also the groups of the imbalances, differing in urgency of managerial influences, directed to the decrease and elimination of the revealed imbalance.

  12. Construction of road network vulnerability evaluation index based on general travel cost

    Science.gov (United States)

    Leng, Jun-qiang; Zhai, Jing; Li, Qian-wen; Zhao, Lin

    2018-03-01

    With the development of China's economy and the continuous improvement of her urban road network, the vulnerability of the urban road network has attracted increasing attention. Based on general travel cost, this work constructs the vulnerability evaluation index for the urban road network, and evaluates the vulnerability of the urban road network from the perspective of user generalised travel cost. Firstly, the generalised travel cost model is constructed based on vehicle cost, travel time, and traveller comfort. Then, the network efficiency index is selected as an evaluation index of vulnerability: the network efficiency index is composed of the traffic volume and the generalised travel cost, which are obtained from the equilibrium state of the network. In addition, the research analyses the influence of traffic capacity decrease, road section attribute value, and location of road section, on vulnerability. Finally, the vulnerability index is used to analyse the local area network of Harbin and verify its applicability.

  13. Development of innovative methods for risk assessment in high-rise construction based on clustering of risk factors

    Science.gov (United States)

    Okolelova, Ella; Shibaeva, Marina; Shalnev, Oleg

    2018-03-01

    The article analyses risks in high-rise construction in terms of investment value with account of the maximum probable loss in case of risk event. The authors scrutinized the risks of high-rise construction in regions with various geographic, climatic and socio-economic conditions that may influence the project environment. Risk classification is presented in general terms, that includes aggregated characteristics of risks being common for many regions. Cluster analysis tools, that allow considering generalized groups of risk depending on their qualitative and quantitative features, were used in order to model the influence of the risk factors on the implementation of investment project. For convenience of further calculations, each type of risk is assigned a separate code with the number of the cluster and the subtype of risk. This approach and the coding of risk factors makes it possible to build a risk matrix, which greatly facilitates the task of determining the degree of impact of risks. The authors clarified and expanded the concept of the price risk, which is defined as the expected value of the event, 105 which extends the capabilities of the model, allows estimating an interval of the probability of occurrence and also using other probabilistic methods of calculation.

  14. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  15. Methods of erection of high-rise buildings

    Science.gov (United States)

    Cherednichenko, Nadezhda; Oleinik, Pavel

    2018-03-01

    The article contains the factors determining the choice of methods for organizing the construction and production of construction and installation work for the construction of high-rise buildings. There are also indicated specific features of their underground parts, characterized by powerful slab-pile foundations, large volumes of earthworks, reinforced bases and foundations for assembly cranes. The work cycle is considered when using reinforced concrete, steel and combined skeletons of high-rise buildings; the areas of application of flow, separate and complex methods are being disclosed. The main conditions for the erection of high-rise buildings and their components are singled out: the choice of formwork systems, delivery and lifting of concrete mixes, installation of reinforcement, the formation of lifting and transporting and auxiliary equipment. The article prescribes the reserves of reduction in the duration of construction due to the creation of: complex mechanized technologies for the efficient construction of foundations in various soil conditions, including in the heaving, swelling, hindered, subsidence, bulk, water-saturated forms; complex mechanized technologies for the erection of monolithic reinforced concrete structures, taking into account the winter conditions of production and the use of mobile concrete-laying complexes and new generation machines; modular formwork systems, distinguished by their versatility, ease, simplicity in operation suitable for complex high-rise construction; more perfect methodology and the development of a set of progressive organizational and technological solutions that ensure a rational relationship between the processes of production and their maximum overlap in time and space.

  16. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  17. A cost summary applicable to seismic construction and maintenance of nuclear safety related piping

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1995-01-01

    This paper presents a summary of costs applicable to nuclear power plant piping for an earthquake defined as 0.2 SSE-PGA as a function of three eras of initial construction: 1967--1974, 1974--1981 and 1981--1990. Costs have been presented for both new construction and maintenance in operating plants using both the original PSAR-FSAR design criteria and current SRP requirements. It is recommended that the cost information contained in this report be considered in evaluating the cost benefit relationships associated with current and proposed future changes in seismic design procedures applicable to safety-related piping systems

  18. Modeling work of the dispatching service of high-rise building as queuing system

    Science.gov (United States)

    Dement'eva, Marina; Dement'eva, Anastasiya

    2018-03-01

    The article presents the results of calculating the performance indicators of the dispatcher service of a high-rise building as a queuing system with an unlimited queue. The calculation was carried out for three models: with a single control room and brigade of service, with a single control room and a specialized service, with several dispatch centers and specialized services. The aim of the work was to investigate the influence of the structural scheme of the organization of the dispatcher service of a high-rise building on the amount of operating costs and the time of processing and fulfilling applications. The problems of high-rise construction and their impact on the complication of exploitation are analyzed. The composition of exploitation activities of high-rise buildings is analyzed. The relevance of the study is justified by the need to review the role of dispatch services in the structure of management of the quality of buildings. Dispatching service from the lower level of management of individual engineering systems becomes the main link in the centralized automated management of the exploitation of high-rise buildings. With the transition to market relations, the criterion of profitability at the organization of the dispatching service becomes one of the main parameters of the effectiveness of its work. A mathematical model for assessing the efficiency of the dispatching service on a set of quality of service indicators is proposed. The structure of operating costs is presented. The algorithm of decision-making is given when choosing the optimal structural scheme of the dispatching service of a high-rise building.

  19. Normative regulation of material incentives for workers in the sphere of high-rise construction

    Science.gov (United States)

    Kopytova, Anna; Matys, Elena; Zotkina, Natalia; Reshetnikova, Irina; Meller, Natalia; Nekrasova, Inna

    2018-03-01

    The article is devoted to the problem of normative and legal regulation of incentives for workers of the building companies. The company considered is engaged in high-rise construction. The part of the document "Regulations for the incentives of employees of the enterprise" is presented. This document is introduced into the practical activities of the Tyumen enterprise. The presented part of the document regulates the issues of material incentives for employees of the enterprise. The document "Regulations for the incentives of employees of the enterprise" is developed in accordance with the approach proposed by author. The document was developed, after the authors had carried out an analysis of the scheme of incentives at the enterprise.

  20. AES, Automated Construction Cost Estimation System

    International Nuclear Information System (INIS)

    Holder, D.A.

    1995-01-01

    A - Description of program or function: AES (Automated Estimating System) enters and updates the detailed cost, schedule, contingency, and escalation information contained in a typical construction or other project cost estimates. It combines this information to calculate both un-escalated and escalated and cash flow values for the project. These costs can be reported at varying levels of detail. AES differs from previous versions in at least the following ways: The schedule is entered at the WBS-Participant, Activity level - multiple activities can be assigned to each WBS-Participant combination; the spending curve is defined at the schedule activity level and a weighing factor is defined which determines percentage of cost for the WBS-Participant applied to the schedule activity; Schedule by days instead of Fiscal Year/Quarter; Sales Tax is applied at the Line Item Level- a sales tax codes is selected to indicate Material, Large Single Item, or Professional Services; a 'data filter' has been added to allow user to define data the report is to be generated for. B - Method of solution: Average Escalation Rate: The average escalation for a Bill of is calculated in three steps. 1. A table of quarterly escalation factors is calculated based on the base fiscal year and quarter of the project entered in the estimate record and the annual escalation rates entered in the Standard Value File. 2. The percentage distribution of costs by quarter for the Bill of Material is calculated based on the schedule entered and the curve type. 3. The percent in each fiscal year and quarter in the distribution is multiplied by the escalation factor for the fiscal year and quarter. The sum of these results is the average escalation rate for that Bill of Material. Schedule by curve: The allocation of costs to specific time periods is dependent on three inputs, starting schedule date, ending schedule date, and the percentage of costs allocated to each quarter. Contingency Analysis: The

  1. Estimation of erosion-accumulative processes at the Inia River’s mouth near high-rise construction zones.

    Directory of Open Access Journals (Sweden)

    Sineeva Natalya

    2018-01-01

    Full Text Available Our study relevance is due to the increasing man-made impact on water bodies and associated land resources within the urban areas, as a consequence, by a change in the morphology and dynamics of Rivers’ canals. This leads to the need to predict the development of erosion-accumulation processes, especially within the built-up urban areas. Purpose of the study is to develop programs on the assessment of erosion-accumulation processes at a water body, a mouth area of the Inia River, in the of perspective high-rise construction zone of a residential microdistrict, the place, where floodplain-channel complex is intensively expected to develop. Results of the study: Within the velocities of the water flow comparing, full-scale measured conditions, and calculated from the model, a slight discrepancy was recorded. This allows us to say that the numerical model reliably describes the physical processes developing in the River. The carried out calculations to assess the direction and intensity of the channel re-formations, made us possible to conclude, there was an insignificant predominance of erosion processes over the accumulative ones on the undeveloped part of the Inia River (the processes activity is noticeable only in certain areas (by the coasts and the island. Importance of the study: The study on the erosion-accumulation processes evaluation can be used in design decisions for the future high-rise construction of this territory, which will increase their economic efficiency.

  2. High-rise construction in Russia as one of the objectives of improving the management mechanism for living standards of the population

    Science.gov (United States)

    Sergeeva, Svetlana; Komyshova, Lyudmila; Nagibina, Natalia

    2018-03-01

    The article is aimed at determining the significance of solving the problem of high-rise construction in Russia as one of the tasks of improving the mechanism of managing the living standards of the population. To determine the effectiveness of measures aimed at improving the quality of life management mechanism, the expert evaluation method is used. The paper presents the measures to improve the quality of life and consequently the migration attractiveness of the region. Despite a number of actual difficulties and lack of sufficient experience, there is an interest in the development of high-rise construction. The result of the analysis of the general demographic dynamics for the last fifteen years is shown. Migration is the most mobile tool for managing short-term demographic processes; therefore, great attention should be paid to this component. Moreover, it is necessary to take into account other consequences of migration.

  3. Methods of erection of high-rise buildings

    Directory of Open Access Journals (Sweden)

    Cherednichenko Nadezhda

    2018-01-01

    Full Text Available The article contains the factors determining the choice of methods for organizing the construction and production of construction and installation work for the construction of high-rise buildings. There are also indicated specific features of their underground parts, characterized by powerful slab-pile foundations, large volumes of earthworks, reinforced bases and foundations for assembly cranes. The work cycle is considered when using reinforced concrete, steel and combined skeletons of high-rise buildings; the areas of application of flow, separate and complex methods are being disclosed. The main conditions for the erection of high-rise buildings and their components are singled out: the choice of formwork systems, delivery and lifting of concrete mixes, installation of reinforcement, the formation of lifting and transporting and auxiliary equipment. The article prescribes the reserves of reduction in the duration of construction due to the creation of: complex mechanized technologies for the efficient construction of foundations in various soil conditions, including in the heaving, swelling, hindered, subsidence, bulk, water-saturated forms; complex mechanized technologies for the erection of monolithic reinforced concrete structures, taking into account the winter conditions of production and the use of mobile concrete-laying complexes and new generation machines; modular formwork systems, distinguished by their versatility, ease, simplicity in operation suitable for complex high-rise construction; more perfect methodology and the development of a set of progressive organizational and technological solutions that ensure a rational relationship between the processes of production and their maximum overlap in time and space.

  4. Models of resource planning during formation of calendar construction plans for erection of high-rise buildings

    Science.gov (United States)

    Pocebneva, Irina; Belousov, Vadim; Fateeva, Irina

    2018-03-01

    This article provides a methodical description of resource-time analysis for a wide range of requirements imposed for resource consumption processes in scheduling tasks during the construction of high-rise buildings and facilities. The core of the proposed approach and is the resource models being determined. The generalized network models are the elements of those models, the amount of which can be too large to carry out the analysis of each element. Therefore, the problem is to approximate the original resource model by simpler time models, when their amount is not very large.

  5. Construction of cost effective homebuilt spin coater for coating ...

    African Journals Online (AJOL)

    We report the construction of a cost effective and low power consumption spin coater from a direct current (DC) brushless motor. The DC mechanical component is widdely available in the central processing unit (CPU) cooler. This set up permits simple operation where the DC voltage can be controlled manually in order to ...

  6. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    Science.gov (United States)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  7. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    OpenAIRE

    Iakymchuk Iryna M.

    2017-01-01

    The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiv...

  8. Gardening as vector of a humanization of high-rise building

    Science.gov (United States)

    Lekareva, Nina; Zaslavskaya, Anna

    2018-03-01

    Article is devoted to issue of integration of vertical gardening into structure of high-rise building in the conditions of the constrained town-planning situation. On the basis of the analysis of the existing experience of design and building of "biopositive" high-rise building ecological, town-planning, social and constructive advantages of the organization of gardens on roofs and vertical gardens are considered [1]. As the main mechanism of increase in investment appeal of high-rise building the principle of a humanization due to gardening of high-rise building taking into account requirements of ecology, energy efficiency of buildings and improvement of quality of construction with minimization of expenses and maximizing comfort moves forward. The National Standards of Green construction designed to adapt the international requirements of architecture and construction of the energy efficient, eco-friendly and comfortable building or a complex to local conditions are considered [2,3].

  9. State of offsite construction in India-Drivers and barriers

    Science.gov (United States)

    Arif, M.; Bendi, D.; Sawhney, A.; Iyer, K. C.

    2012-05-01

    The rapid growth of the construction industry in India has influenced key players in the industry to adopt alternative technologies addressing time, cost and quality. The rising demand in housing, infrastructure and other facilities have further highlighted the need for the construction industry to look at adopting alternate building technologies. Offsite construction has evolved as a panacea to dealing with the under-supply and poor quality in the current age construction industry. Several offsite techniques have been adopted by the construction sector. Although, different forms of offsite techniques have been around for a while but their uptake has been low in the Indian context. This paper presents the perceptions about offsite construction in India and highlights some of the barriers and drivers facing the Indian construction industry. The data was gathered through a survey of 17 high level managers from some of the largest stakeholder organizations of the construction sector in India. The influence of time and cost has been highlighted as a major factor fuelling the adoption of offsite construction. However, the influence of current planning systems and the need for a paradigm shift are some of the prominent barriers towards the adoption of offsite techniques.

  10. Effect of construction time, interest rate, and inflation on the capital cost of nuclear power plants

    International Nuclear Information System (INIS)

    Abel, P.S.; Greybeck, E.M.; Omberg, R.P.

    1981-09-01

    Cost estimates for nuclear power plants currently under construction are on the order of four billion dollars. It will be shown, in this paper, that this is a direct consequence of relatively high inflation rates and relatively long construction times. If either inflation rates or construction times, or a combination thereof, should decrease significantly, cost estimates for nuclear power plants could return to approximately two billion dollars

  11. DEVELOPMENT OF HIGH-RISE CONSTRUCTION IN THE CITIES WITH POPULATION FROM 250 TO 500 THOUSAND INHABITANTS (on the example of the cities of the Ural Federal District

    Directory of Open Access Journals (Sweden)

    Olga Mikhaylovna Shentsova

    2017-09-01

    Full Text Available In article history of construction of high-rise buildings, features of perception of high-rise buildings in the urban environment what factors influence the choice of the site of high-rise buildings are considered. Such concepts as “skyscraper”, “a high-rise dominant” reveal. Also, the analysis of existence of high-rise buildings of the large cities with population from 250 to 500 thousand residents of the Ural Federal District is provided: Barrow, Nizhny Tagil, Nizhnevartovsk, Surgut and Magnitogorsk. And also the analysis of a town-planning situation of Magnitogorsk where the possible, most probable and offered places for an arrangement of high-rise buildings on crossing or end of axes of streets are revealed is given. Work purpose – the analysis of high-rise construction in the large cities of the Ural Federal District with population from 250 to 500 thousand inhabitants. Method or methodology of carrying out work: in article methods of the theoretical and visual analysis, observation, and also studying literary and the Internet of sources were used. Results: the systematized theoretical material in the field of architecture and town planning of the cities of the Ural Federal District is received. Scope of results: the received results can be applied in the field of architectural education and practical architectural activities.

  12. Design, construction and testing of a low-cost flat plate solar energy ...

    African Journals Online (AJOL)

    A low-cost flat plate solar energy collector has been designed and constructed with locally available materials such as mild steel and black paint of absorptance 0.94. On testing, an average daily efficiency of 55.6% was obtained. The methods are simple and illustrate the fact that construction of efficient collectors are ...

  13. FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECTS WITHIN KELANTAN STATE IN MALAYSIA

    OpenAIRE

    ABDELNASER OMRAN; SITI NORHYDAYATON BINTI MAMAT

    2011-01-01

    This study investigates the factors affecting cost performance of construction projects in Kelantan State located in the east-coast part of Malaysia. It draws on relevant previous research in the theory of work on cost performance. Thirty-three contractors companies with different working grades in the state of Kelantan were participated in the study. Data were collected from the contractors using a questionnaire survey. The results indicated that the success factors affecting the cost perfor...

  14. Preliminary ITER cost and schedule estimates

    International Nuclear Information System (INIS)

    1990-01-01

    The cost, manpower requirements, and schedule estimates for the realization of the ITER tokamak have been studied during the Conceptual Design Activities, as a result of work by the ITER Management Committee. This work was completed during the January-March, 1990 joint work session, and is presented in this report. A possible schedule shows completion of the engineering design phase in 1995, with 180 professionals, at a cost of about $250M. The construction would be completed in 2004 with a rise in professional staff to 300, and a total cost of $4900M. The machine would be operable over an 18-year period, at an annual operating cost averaging $290M. 2 figs

  15. Space-planning and structural solutions of low-rise buildings: Optimal selection methods

    Science.gov (United States)

    Gusakova, Natalya; Minaev, Nikolay; Filushina, Kristina; Dobrynina, Olga; Gusakov, Alexander

    2017-11-01

    The present study is devoted to elaboration of methodology used to select appropriately the space-planning and structural solutions in low-rise buildings. Objective of the study is working out the system of criteria influencing the selection of space-planning and structural solutions which are most suitable for low-rise buildings and structures. Application of the defined criteria in practice aim to enhance the efficiency of capital investments, energy and resource saving, create comfortable conditions for the population considering climatic zoning of the construction site. Developments of the project can be applied while implementing investment-construction projects of low-rise housing at different kinds of territories based on the local building materials. The system of criteria influencing the optimal selection of space-planning and structural solutions of low-rise buildings has been developed. Methodological basis has been also elaborated to assess optimal selection of space-planning and structural solutions of low-rise buildings satisfying the requirements of energy-efficiency, comfort and safety, and economical efficiency. Elaborated methodology enables to intensify the processes of low-rise construction development for different types of territories taking into account climatic zoning of the construction site. Stimulation of low-rise construction processes should be based on the system of approaches which are scientifically justified; thus it allows enhancing energy efficiency, comfort, safety and economical effectiveness of low-rise buildings.

  16. Rising labor costs, earnings management, and financial performance of health care providers around the world.

    Science.gov (United States)

    Dong, Gang Nathan

    2015-01-01

    Amid increasing interest in how government regulation and market competition affect the cost and financial sustainability in health care sector, it remains unclear whether health care providers behave similarly to their counterparts in other industries. The goal of this chapter is to study the degree to which health care providers manipulate accruals in periods of financial difficulties caused, in part, by the rising costs of labor. We collected the financial information of health care provider in 43 countries from 1984 to 2013 and conducted a pooled cross-sectional study with country and year fixed-effects. The empirical evidence shows that health care providers with higher wage costs are more likely to smooth their earnings in order to maintain financial sustainability. The finding of this study not only informs regulators that earnings management is pervasive in health care organizations around the world, but also contributes to the studies of financial booktax reporting alignment, given the existing empirical evidence linking earnings management to corporate tax avoidance in this very sector.

  17. Construction cost impacts related to manpower, material, and equipment factors in contractor firms perspective

    Science.gov (United States)

    Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad

    2017-11-01

    Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.

  18. Investor's experience with keeping fixed costs during the construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Cecil, P.

    1990-01-01

    The introduction of fixed costs in the construction of the Temelin nuclear power plant should secure stabilization of budget cost and prevent its increase. The differences between the fixed costs method and the procedure used so far are briefly described. The introduction of fixed costs was to be followed by the corresponding legal regulations; however, the legal adjustment has not been carried out in the desired completeness. The reason is the difference in understanding the notion of fixed costs by the investor, the contractor and the designer. Another problem is the difference in the level and the detail of the initial project design and of the Soviet implementation designs. The investor believes that the introduction of fixed costs has not yet met with the desired response by organizations participating in the construction. (J.P.)

  19. Use sulfoferritic cements in construction

    Science.gov (United States)

    Samchenko, Svetlana V.; Zorin, Dmitriy A.

    2018-03-01

    Currently, high-rise construction has received increasing attention around the world. In the big cities under construction is less space and one solution is the high-rise construction. However, high-rise buildings use special requirements, such as strength, thermal insulation, wind load and others. When concrete is exposed to continuous loads by wind or to mechanical loads, it undergoes abrasion. Resistance to this process depends on the characteristics of materials that the concrete and finishing seams are made of. Research on increasing impact and abrasion resistance of calcium sulfoferrite-based cement stone from the perspective of formation of cement stone structure will be instrumental in developing durable materials for application in high-rise construction.

  20. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  1. Cost Consideration and a Possible Construction Timeline of the CEPC-SPPC

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Weiren [Fermilab

    2015-04-01

    This paper discusses the cost consideration and a possible construction timeline of the CEPC-SPPC study based on a preliminary conceptual design that is being carried out at the Institute of High Energy Physics (IHEP) in China.

  2. Payroll costs not identified by phase in construction work done with no third subcontracted

    Directory of Open Access Journals (Sweden)

    Rubén Antonio González Franco

    2012-05-01

    Full Text Available The Social Insurance Regulations applicable to the construction companies with regard to meeting high work requires the owner to generate high for each construction phase and thus to check the amounts of materials, machinery and equipment, as well as labor applied at the same stage, all in order to validate that it complies 100% with the payment of worker-employer contributions by the employer, guidelines in the specific case of SMEs practice becomes more complex, controls as these companies have no proof phased costs in two areas in particular, as are exercised costs of materials and workmanship for housing, which is why this research aims to solve the problem of generating clear guidelines to comply with the verification of payment of contributions in the field of labor when it is exerciseddirectly, and through the application of direct interviews and questionnaires to the units of analysis consists of businessmen, representatives, directors or business accountants SMEs construction, staff of the National Chamber of construction Industry and the Mexican Social Security Institute head of the Department of construction, who will answer questions the same instrument provides, and with this it was determined that in fact the perception of these SMEs is required to leave a standard criterion for testing and would be more appropriate apportionment of costs proportionately based on hire dates and termination dates of the work keeping track of costs identifying overall, leaving an identification number in the working papers for further review by the authority.

  3. New technologies for lower-cost design and construction of new nuclear power plants. Annex 20

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.; Bryan, R.E.; Harmon, D.L.

    2002-01-01

    Electric Power Research Institute studies indicate that in order to be competitive with gas-fired electric power plant capital costs, new nuclear plant capital cost in the USA must be decreased by at least 35% to 40% relative to costs of some Advanced Light Water Reactors designed in the early 1990s. To address this need, the U. S. Department of Energy is sponsoring three separate projects under its Nuclear Energy Research Initiative. These projects are the Risk-Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants, the Smart Equipment Nuclear Power Plant Program, and the Design, Procure, Construct, Install and Test Program. The goal of the Design-Construction program is reduction of the complete nuclear plant design-procure-construct-install-test cycle schedule and cost. A 3D plant model was combined with a construction schedule to produce a 4D visualization of plant construction, which was then used to analyze plant construction methods. Insights include the need for concurrent engineering, a plant-wide central database, and use of the World-Wide WEB. The goal of Smart Equipment program is to design, develop, and evaluate the methods for implementing smart equipment and predictive maintenance technology. 'Smart' equipment means components and systems that are instrumented and monitored to detect incipient failures in order to improve their reliability. The resulting smart equipment methods will be combined with a more risk-informed regulatory approach to allow plant designers to (1) simplify designs without compromising overall reliability and safety and (2) maintain more reliable plants at lower cost. Initial results show that rotating equipment such as charging pumps would benefit most from smart instrumentation and that the technique of Bayesian Belief Networks would be most appropriate for providing input to a health monitoring system. (author)

  4. Construction Performance Optimization toward Green Building Premium Cost Based on Greenship Rating Tools Assessment with Value Engineering Method

    Science.gov (United States)

    Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat

    2017-07-01

    Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.

  5. Nuclear operating costs are rising exponentially - official

    International Nuclear Information System (INIS)

    Thomas, S.

    1988-01-01

    The Energy Information Agency of the United States Department of Energy has collected data on the operations of nuclear power plants in the United States. A statistical regression analysis was made of this data base. This shows that the escalation in annual, real non-fuel operating costs is such that the operating cost savings made by closing down an old nuclear plant would be sufficient to pay the capital and operating costs of replacing it with a brand new coal-fired plant. The main reason for the increasing operating and maintenance costs is the cost of replacement power i.e. the higher the economic penalty of plant breakdown the more the utility has to spend on maintenance. Another reason is time -not the age of the plant - but the year the data was collected. The economic case for nuclear power is seriously challenged. (U.K.)

  6. Revival of nuclear power engineering in the Central-Eastern Europe in response to rising power demand and the problem of CO2 emission

    Energy Technology Data Exchange (ETDEWEB)

    Rozkosz, Grazyna; Kaszowski, Bartosz

    2010-09-15

    Safety and reliability of electric power supply is guarantee for stable development. Necessity of decommissioning of largely depreciated power plants and rising power demands (average ca. 3% per year) may cause energy deficit in CE Europe. Decision on construction new power plants is determined mainly by power energy generation costs. Nuclear power generation cost forecast is significantly lower than cost of energy from fossil fuels. Such factors offer a new view on source of ''clean and safe'' nuclear energy.

  7. Feasibility of perpetual pavement stage construction in China: A life cycle cost analysis

    Directory of Open Access Journals (Sweden)

    Zhongyin Guo

    2016-12-01

    Full Text Available The main objective of pavement design and management is to build sustainable pavement structure with minimum costs during its whole life. There are many uncertainties in the process of pavement design pertaining many of its variables, such as future traffic estimation, long time behavior of materials, future weights and types of traveling vehicles, availability of funds etc. Therefore, it is important to apply pavement stage construction technique during the process of pavement design and management to minimize the risk associated with these uncertainties. From the beginning of 2000, the research and application of perpetual asphalt pavement (PP technology has been deployed in China. The semi rigid base for asphalt pavement has been normally considered as typical component of high class highways in the design according to the Chinese experience since 1997. The research objective is to apply pavement stage construction for the evaluation of life cycle costs of Chinese perpetual and traditional semi rigid pavements using operational pavement management system in addition to examine its suitability for design and construction of more economical and durable flexible pavements. It has been found that the stage construction of asphalt layers in PP over semi rigid pavement foundation will create more sustainable and trusted pavement structures in spite of 2–5% increase in present total cost.

  8. Development of national standards related to the integrated safety and security of high-rise buildings

    Science.gov (United States)

    Voskresenskaya, Elena; Vorona-Slivinskaya, Lubov

    2018-03-01

    The article considers the issues of developing national standards for high-rise construction. The system of standards should provide industrial, operational, economic and terrorist safety of high-rise buildings and facilities. Modern standards of high-rise construction should set the rules for designing engineering systems of high-rise buildings, which will ensure the integrated security of buildings, increase their energy efficiency and reduce the consumption of resources in construction and operation.

  9. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    International Nuclear Information System (INIS)

    El-Alaily, T.M.; El-Nimr, M.K.; Saafan, S.A.; Kamel, M.M.; Meaz, T.M.; Assar, S.T.

    2015-01-01

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability. - Highlights: • A low cost automated vibrating sample magnetometer VSM has been constructed. • The VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. • The VSM has been calibrated and tested by using some measured ferrite samples. • Our VSM lab-built new design proved success and reliability

  10. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    Energy Technology Data Exchange (ETDEWEB)

    El-Alaily, T.M., E-mail: toson_alaily@yahoo.com [Physics Department, Faculty of Science, Tanta University, Tanta (Egypt); El-Nimr, M.K.; Saafan, S.A.; Kamel, M.M.; Meaz, T.M. [Physics Department, Faculty of Science, Tanta University, Tanta (Egypt); Assar, S.T. [Engineering Physics and Mathematics Department, Faculty of Engineering, Tanta University, Tanta (Egypt)

    2015-07-15

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability. - Highlights: • A low cost automated vibrating sample magnetometer VSM has been constructed. • The VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. • The VSM has been calibrated and tested by using some measured ferrite samples. • Our VSM lab-built new design proved success and reliability.

  11. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  12. Research on Chinese Intelligent Guanglianda in High-rise Construction

    Science.gov (United States)

    Romanovich, Marina; Shi, Peiyu; Wang, Ziyue; Zhao, Liang; Gerasimova, Vera

    2018-03-01

    Since the reform and opening up in China, the rapid development of China's construction industry, especially after 2011, BIM technology in China has a rapid development and depth of application. This article mainly discusses the process of development of China's construction industry management and the process of development of BIM technology in China and, the use of software in China, the main use of revit in 3D modeling (design stage), the use of Guanglianda in the whole process of construction management. This article researches on Guanglianda and the applications were described, for example, in the integrated project of management information, labor management information, construction video surveillance, material management, material site acceptance. This paper also elaborates on the cooperation of Revit and Guanglianda in different stages. This paper also elaborates on a construction case in China, and makes a description of the problems of crane, facts and time, and then explores the reasons behind the rapid construction of China. And the feasibility of China's construction management approach to the introduction of Russia.

  13. Research on Chinese Intelligent Guanglianda in High-rise Construction

    Directory of Open Access Journals (Sweden)

    Romanovich Marina

    2018-01-01

    Full Text Available Since the reform and opening up in China, the rapid development of China's construction industry, especially after 2011, BIM technology in China has a rapid development and depth of application. This article mainly discusses the process of development of China's construction industry management and the process of development of BIM technology in China and, the use of software in China, the main use of revit in 3D modeling (design stage, the use of Guanglianda in the whole process of construction management. This article researches on Guanglianda and the applications were described, for example, in the integrated project of management information, labor management information, construction video surveillance, material management, material site acceptance. This paper also elaborates on the cooperation of Revit and Guanglianda in different stages. This paper also elaborates on a construction case in China, and makes a description of the problems of crane, facts and time, and then explores the reasons behind the rapid construction of China. And the feasibility of China's construction management approach to the introduction of Russia.

  14. Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects

    Science.gov (United States)

    Lapidus, Azary; Abramov, Ivan

    2018-03-01

    Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew).

  15. Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects

    Directory of Open Access Journals (Sweden)

    Lapidus Azary

    2018-01-01

    Full Text Available Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew.

  16. Development of national standards related to the integrated safety and security of high-rise buildings

    Directory of Open Access Journals (Sweden)

    Voskresenskaya Elena

    2018-01-01

    Full Text Available The article considers the issues of developing national standards for high-rise construction. The system of standards should provide industrial, operational, economic and terrorist safety of high-rise buildings and facilities. Modern standards of high-rise construction should set the rules for designing engineering systems of high-rise buildings, which will ensure the integrated security of buildings, increase their energy efficiency and reduce the consumption of resources in construction and operation.

  17. Construction Guide to Next-Generation High-Performance Walls in Climate Zones 3-5 - Part 1: 2x6 Walls

    Energy Technology Data Exchange (ETDEWEB)

    Kochkin, V. [Home Innovation Research Labs, Upper Marlboro, MD (United States); Wiehagen, J. [Home Innovation Research Labs, Upper Marlboro, MD (United States)

    2017-08-31

    Part 1 of this Construction Guide to High-Performance Walls in Climate Zones 3-5 provides time-proven, practical, and cost-effective strategies for constructing durable, energy-efficient walls. It addresses walls constructed with 2x6 wood frame studs, wood structural panel (WSP) exterior sheathing, and a cladding system installed over WSP sheathing in low-rise residential buildings up to three stories high.

  18. The Rise and Fall in Out-of-Pocket Costs in Australia: An Analysis of the Strengthening Medicare Reforms.

    Science.gov (United States)

    Wong, Chun Yee; Greene, Jessica; Dolja-Gore, Xenia; van Gool, Kees

    2017-08-01

    After a period of steady decline, out-of-pocket (OOP) costs for general practitioner (GP) consultations in Australia began increasing in the mid-1990s. Following the rising community concerns about the increasing costs, the Australian Government introduced the Strengthening Medicare reforms in 2004 and 2005, which included a targeted incentive for GPs to charge zero OOP costs for consultations provided to children and concession cardholders (older adults and the poor), as well as an increase in the reimbursement for all GP visits. This paper examines the impact of those reforms using longitudinal survey and administrative data from a large national sample of women. The findings suggest that the reforms were effective in reducing OOP costs by an average of $A0.40 per visit. Decreases in OOP costs, however, were not evenly distributed. Those with higher pre-reform OOP costs had the biggest reductions in OOP costs, as did those with concession cards. However, results also reveal increases in OOP costs for most people without a concession card. The analysis suggests that there has been considerable heterogeneity in GP responses to the reforms, which has led to substantial changes in the fees charged by doctors and, as a result, the OOP costs incurred by different population groups. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  19. A comparative analysis of methods to represent uncertainty in estimating the cost of constructing wastewater treatment plants.

    Science.gov (United States)

    Chen, Ho-Wen; Chang, Ni-Bin

    2002-08-01

    Prediction of construction cost of wastewater treatment facilities could be influential for the economic feasibility of various levels of water pollution control programs. However, construction cost estimation is difficult to precisely evaluate in an uncertain environment and measured quantities are always burdened with different types of cost structures. Therefore, an understanding of the previous development of wastewater treatment plants and of the related construction cost structures of those facilities becomes essential for dealing with an effective regional water pollution control program. But deviations between the observed values and the estimated values are supposed to be due to measurement errors only in the conventional regression models. The inherent uncertainties of the underlying cost structure, where the human estimation is influential, are rarely explored. This paper is designed to recast a well-known problem of construction cost estimation for both domestic and industrial wastewater treatment plants via a comparative framework. Comparisons were made for three technologies of regression analyses, including the conventional least squares regression method, the fuzzy linear regression method, and the newly derived fuzzy goal regression method. The case study, incorporating a complete database with 48 domestic wastewater treatment plants and 29 industrial wastewater treatment plants being collected in Taiwan, implements such a cost estimation procedure in an uncertain environment. Given that the fuzzy structure in regression estimation may account for the inherent human complexity in cost estimation, the fuzzy goal regression method does exhibit more robust results in terms of some criteria. Moderate economy of scale exists in constructing both the domestic and industrial wastewater treatment plants. Findings indicate that the optimal size of a domestic wastewater treatment plant is approximately equivalent to 15,000 m3/day (CMD) and higher in Taiwan

  20. Rightsizing HVAC Systems to Reduce Capital Costs and Save Energy

    Science.gov (United States)

    Sebesta, James

    2010-01-01

    Nearly every institution is faced with the situation of having to reduce the cost of a construction project from time to time through a process generally referred to as "value engineering." Just the mention of those words, however, gives rise to all types of connotations, thoughts, and memories (usually negative) for those in the…

  1. Does public insurance provide better financial protection against rising health care costs for families of children with special health care needs?

    Science.gov (United States)

    Yu, Hao; Dick, Andrew W; Szilagyi, Peter G

    2008-10-01

    Health care costs grew rapidly since 2001, generating substantial economic pressures on families, especially those with children with special health care needs (CSHCN). To examine how the growth of health care costs affected financial burden for families of CSHCN between 2001 and 2004 and to determine the extent to which health insurance coverage protected families of CSHCN against financial burden. In 2001-2004, 5196 families of CSHCN were surveyed by the national Medical Expenditure Panel Survey (MEPS). The main outcome was financial burden, defined as the proportion of family income spent on out-of-pocket (OOP) health care expenditures for all family members, including OOP costs and premiums. Family insurance coverage was classified as: (1) all members publicly insured, (2) all members privately insured, (3) all members uninsured, (4) partial coverage, and (5) a mix of public and private with no uninsured periods. An upward trend in financial burden for families of CSHCN occurred and was associated with growth of economy-wide health care costs. A multivariate analysis indicated that, given the economy-wide increase in medical costs between 2001 and 2004, a family with CSHCN was at increased risk in 2004 for having financial burden exceeding 10% of family income [odds ratio (OR) = 1.39; P financial burden exceeding 20% of family income. Over 15% of families with public insurance had financial burden exceeding 10% of family income compared with 20% of families with private insurance (P financial burden of >10% or 20% of family income than privately-insured families. Rising health care costs increased financial burden on families of CSHCN in 2001-2004. Public insurance coverage provided better financial protection than private insurance against the rapidly rising health care costs for families of CSHCN.

  2. Identifying critical success factors (CSFs) of Facilities Management (FM) in non-low cost high-rise residential buildings

    Science.gov (United States)

    Dahlan, F. M.; Zainuddin, A.

    2018-02-01

    Critical success factors (CSFs) are important key areas of activity that must be performed well in any Facilities Management (FM) organisation to achieve its missions, objectives or goals. Before implementing CSFs, an FM organisation must identify the key areas where things must be done properly to enable the business to flourish. Although many performance measurements in FM organisation have been discussed in previous research, not much research has been done on CSFs from the perspective of FM business in non-low cost high-rise residential buildings. The purpose of this study is to develop a methodology in developing the CSFs group and CSFs for FM organisation in non-low cost residential buildings. This research will involve three (3) phases of research strategy to achieve the objective of this research.

  3. Study of the Effectiveness of Outrigger System for High-Rise Composite Buildings for Cyclonic Region

    OpenAIRE

    S. Fawzia; A. Nasir; T. Fatima

    2011-01-01

    The demands of taller structures are becoming imperative almost everywhere in the world in addition to the challenges of material and labor cost, project time line etc. This paper conducted a study keeping in view the challenging nature of high-rise construction with no generic rules for deflection minimizations and frequency control. The effects of cyclonic wind and provision of outriggers on 28-storey, 42-storey and 57-storey are examined in this paper and certain conclusions are made which...

  4. Measuring the environmental costs of tidal power plant construction: A choice experiment study

    International Nuclear Information System (INIS)

    Lee, Joo-Suk; Yoo, Seung-Hoon

    2009-01-01

    Korea is considering the construction of a tidal power plant (TPP) at Garolim Bay. However, as the construction of the Garolim TPP (GTPP) is expected to entail some environmental damage, it has become an increasingly important topic for public debate. Using a choice experiment (CE) approach, this study attempts to measure the economic cost that results from the environmental damage caused by the construction of GTPP. The CE is used to measure the environmental costs of individual attributes, including the reduction in the area of the tidal flat, the degradation of seawater quality, and the destruction of marine life. The results indicate that the annual willingness to pay (WTP) per household for mitigating the environmental damage that results from the worst-possible situation in relation to the present situation is about 96,042 Korean won (USD 101.1) in the seven biggest cities (off-site regions) and 18,584 Korean won (USD 19.6) in Seosan and Taean (on-site regions). This study is expected to provide policy-makers with quantitative information that will be useful to decide whether or not GTPP should be constructed.

  5. A reply to “Historical construction costs of global nuclear power reactors”

    International Nuclear Information System (INIS)

    Koomey, Jonathan; Hultman, Nathan E.; Grubler, Arnulf

    2017-01-01

    present data on the overnight costs of more than half of nuclear reactors built worldwide since the beginning of the nuclear age. The authors claim that this consolidated data set offers more accurate insights than previous country-level assessments. Unfortunately, the authors make analytical choices that mask nuclear power's real construction costs, cherry pick data, and include misleading data on early experimental and demonstration reactors. For those reasons, serious students of such issues should look elsewhere for guidance about understanding the true costs of nuclear power. - Highlights: • claim to accurately assess nuclear plant costs over time. • The authors err by relying on overnight costs, which exclude interest. • The authors cherry pick data (e.g, ignoring problems with French nuclear data). • The article's cherry picked data don’t even support the article's own conclusions. • Lovering et al. is not a reliable source for costs of nuclear power.

  6. Validation of generic cost estimates for construction-related activities at nuclear power plants: Final report

    International Nuclear Information System (INIS)

    Simion, G.; Sciacca, F.; Claiborne, E.; Watlington, B.; Riordan, B.; McLaughlin, M.

    1988-05-01

    This report represents a validation study of the cost methodologies and quantitative factors derived in Labor Productivity Adjustment Factors and Generic Methodology for Estimating the Labor Cost Associated with the Removal of Hardware, Materials, and Structures From Nuclear Power Plants. This cost methodology was developed to support NRC analysts in determining generic estimates of removal, installation, and total labor costs for construction-related activities at nuclear generating stations. In addition to the validation discussion, this report reviews the generic cost analysis methodology employed. It also discusses each of the individual cost factors used in estimating the costs of physical modifications at nuclear power plants. The generic estimating approach presented uses the /open quotes/greenfield/close quotes/ or new plant construction installation costs compiled in the Energy Economic Data Base (EEDB) as a baseline. These baseline costs are then adjusted to account for labor productivity, radiation fields, learning curve effects, and impacts on ancillary systems or components. For comparisons of estimated vs actual labor costs, approximately four dozen actual cost data points (as reported by 14 nuclear utilities) were obtained. Detailed background information was collected on each individual data point to give the best understanding possible so that the labor productivity factors, removal factors, etc., could judiciously be chosen. This study concludes that cost estimates that are typically within 40% of the actual values can be generated by prudently using the methodologies and cost factors investigated herein

  7. E-COCOMO: The Extended COst Constructive MOdel for Cleanroom Software Engineering

    Directory of Open Access Journals (Sweden)

    Hitesh KUMAR SHARMA

    2014-02-01

    Full Text Available Mistakes create rework. Rework takes time and increases costs. The traditional software engineering methodology defines the ratio of Design:Code:Test as 40:20:40. As we can easily see that 40% time and efforts are used in testing phase in traditional approach, that means we have to perform rework again if we found some bugs in testing phase. This rework is being performed after Design and code phase. This rework will increase the cost exponentially. The cleanroom software engineering methodology controls the exponential growth in cost by removing this rework. It says that "do the work correct in first attempt and move to next phase after getting the proof of correctness". This new approach minimized the rework and reduces the cost in the exponential ratio. Due to the removal of testing phase, the COCOMO (COst COnstructive MOdel used for the traditional engineering is not directly applicable in cleanroom software engineering. The traditional cost drivers used for traditional COCOMO needs to be revised. We have proposed the Extended version of COCOMO (i.e. E-COCOMO in which we have incorporated some new cost drivers. This paper explains the proposed E-COCOMO and the detailed description of proposed new cost driver.

  8. Construction cost estimation of spherical storage tanks: artificial neural networks and hybrid regression—GA algorithms

    Science.gov (United States)

    Arabzadeh, Vida; Niaki, S. T. A.; Arabzadeh, Vahid

    2017-10-01

    One of the most important processes in the early stages of construction projects is to estimate the cost involved. This process involves a wide range of uncertainties, which make it a challenging task. Because of unknown issues, using the experience of the experts or looking for similar cases are the conventional methods to deal with cost estimation. The current study presents data-driven methods for cost estimation based on the application of artificial neural network (ANN) and regression models. The learning algorithms of the ANN are the Levenberg-Marquardt and the Bayesian regulated. Moreover, regression models are hybridized with a genetic algorithm to obtain better estimates of the coefficients. The methods are applied in a real case, where the input parameters of the models are assigned based on the key issues involved in a spherical tank construction. The results reveal that while a high correlation between the estimated cost and the real cost exists; both ANNs could perform better than the hybridized regression models. In addition, the ANN with the Levenberg-Marquardt learning algorithm (LMNN) obtains a better estimation than the ANN with the Bayesian-regulated learning algorithm (BRNN). The correlation between real data and estimated values is over 90%, while the mean square error is achieved around 0.4. The proposed LMNN model can be effective to reduce uncertainty and complexity in the early stages of the construction project.

  9. 2007 Effect of Changes in Layout Shape on Unit Construction Cost

    African Journals Online (AJOL)

    ezra

    The shape of a building layout is the spatial attribute that defines the outline of the building. ... The results of this study indicate that perimeter-to-floor ratio, unit construction ... Design variables have been defined as the .... The objective of this paper is to explore the effect ... preparation of cost estimate, changing of design.

  10. Cost of nuclear power generation judged by power rate

    International Nuclear Information System (INIS)

    Hirai, Takaharu

    1981-01-01

    According to estimation guidance, power rates in general are the proper cost plus the specific compensation and adjustment addition. However, the current system of power rates is of power-source development promotion type involving its tax. The structure of power rate determination must be restudied now especially in connection of nuclear power generation. The cost of nuclear power generation as viewed from power rate is discussed as follows: the fear of military application of power plants, rising plant construction costs, the loophole in fuel cost calculation, unreasonable unit power cost, depreciation and repair cost, business compensation, undue business compensation in nuclear power, the costs of nuclear waste management, doubt concerning nuclear power cost, personnel, pumping-up and power transmission costs in nuclear power, energy balance analysis, nuclear power viewed in entropy, the suppression of power consumption. (J.P.N.)

  11. Construction cost prediction model for conventional and sustainable college buildings in North America

    Directory of Open Access Journals (Sweden)

    Othman Subhi Alshamrani

    2017-03-01

    Full Text Available The literature lacks in initial cost prediction models for college buildings, especially comparing costs of sustainable and conventional buildings. A multi-regression model was developed for conceptual initial cost estimation of conventional and sustainable college buildings in North America. RS Means was used to estimate the national average of construction costs for 2014, which was subsequently utilized to develop the model. The model could predict the initial cost per square feet with two structure types made of steel and concrete. The other predictor variables were building area, number of floors and floor height. The model was developed in three major stages, such as preliminary diagnostics on data quality, model development and validation. The developed model was successfully tested and validated with real-time data.

  12. Development of econometric models for cost and time over-runs: an empirical study of major road construction projects in pakistan

    International Nuclear Information System (INIS)

    Khan, A.; Chaudhary, M.A.

    2016-01-01

    The construction industry is flourishing worldwide and contributes about 10% to the GDP of the world i.e. up to the tune of 4.6 Trillion US dollars. It employs almost 7% of the total employee dpersons and, consumes around 40% of the total energy. The Pakistani construction sector has displayed impressive growth in recent past years. The efficient road network is a key part of construction business and plays a significant role in the economic uplift of country. The overruns in costs and delays in completion of projects are very common phenomena and it has also been observed that the projects involving construction of roads also face problems of delays and cost over runs especially in developing countries. The causes of cost overruns and delays in road projects being undertaken by the premier road construction organization of Pakistan National Highway Authority (NHA) have been considered in this study. It has been done specifically in the context of impact of cause(s) determined from project report of a total of one hundred and thirty one (131) projects. The ten causative factors which we recognize as Design, Planning and Scheduling Related problems, Financial Constraint Related reasons, Social Problem Related reasons, Technical Reasons, Administrative Reasons, Scope Increase, Specification Changes, Cost Escalation Related reasons, Non-Availability of Equipment or Material and Force Majeure play a commanding role in determination of the cost and time over runs. It has also been observed that among these identified causes, the factors of Administrative Reason, Design, Planning and Scheduling Related, Technical Reasons and Force Majeure are the most significant reasons in cost and time overruns. Whereas, the Cost Escalation related reasons has the least impact on cost increase and delays. The NHA possesses a financial worth of around Rs. 36 billion and with an annual turn over amounting to Rs. 22 billion is responsible to perform road construction project in entire

  13. Development of high-rise buildings: digitalization of life cycle management

    Directory of Open Access Journals (Sweden)

    Gusakova Elena

    2018-01-01

    Full Text Available The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.

  14. Development of high-rise buildings: digitalization of life cycle management

    Science.gov (United States)

    Gusakova, Elena

    2018-03-01

    The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.

  15. Comparative evaluation of low cost materials as constructed wetland filling media

    Science.gov (United States)

    Pinho, Henrique J. O.; Vaz, Mafalda M.; Mateus, Dina M. R.

    2017-11-01

    Three waste materials from civil construction activities were assessed as low cost alternative filling materials used in Constructed Wetlands (CW). CW are green processes for wastewater treatment, whose design includes an appropriate selection of vegetation and filling material. The sustainability of such processes may be incremented using recovered wastes as filling materials. The abilities of the materials to support plant growth and to contribute to pollutants removal from wastewater were assessed and compared to expanded clay, a filling usually used in CW design. Statistical analysis, using one-way ANOVA and Welch's ANOVA, demonstrate that limestone fragments are a better choice of filling material than brick fragments and basalt gravel.

  16. Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman

    Directory of Open Access Journals (Sweden)

    K. Alzebdeh

    2015-06-01

    Full Text Available Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East.  Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.

  17. Cost-Sharing of Ecological Construction Based on Trapezoidal Intuitionistic Fuzzy Cooperative Games

    Directory of Open Access Journals (Sweden)

    Jiacai Liu

    2016-11-01

    Full Text Available There exist some fuzziness and uncertainty in the process of ecological construction. The aim of this paper is to develop a direct and an effective simplified method for obtaining the cost-sharing scheme when some interested parties form a cooperative coalition to improve the ecological environment of Min River together. Firstly, we propose the solution concept of the least square prenucleolus of cooperative games with coalition values expressed by trapezoidal intuitionistic fuzzy numbers. Then, based on the square of the distance in the numerical value between two trapezoidal intuitionistic fuzzy numbers, we establish a corresponding quadratic programming model to obtain the least square prenucleolus, which can effectively avoid the information distortion and uncertainty enlargement brought about by the subtraction of trapezoidal intuitionistic fuzzy numbers. Finally, we give a numerical example about the cost-sharing of ecological construction in Fujian Province in China to show the validity, applicability, and advantages of the proposed model and method.

  18. Cost-Sharing of Ecological Construction Based on Trapezoidal Intuitionistic Fuzzy Cooperative Games.

    Science.gov (United States)

    Liu, Jiacai; Zhao, Wenjian

    2016-11-08

    There exist some fuzziness and uncertainty in the process of ecological construction. The aim of this paper is to develop a direct and an effective simplified method for obtaining the cost-sharing scheme when some interested parties form a cooperative coalition to improve the ecological environment of Min River together. Firstly, we propose the solution concept of the least square prenucleolus of cooperative games with coalition values expressed by trapezoidal intuitionistic fuzzy numbers. Then, based on the square of the distance in the numerical value between two trapezoidal intuitionistic fuzzy numbers, we establish a corresponding quadratic programming model to obtain the least square prenucleolus, which can effectively avoid the information distortion and uncertainty enlargement brought about by the subtraction of trapezoidal intuitionistic fuzzy numbers. Finally, we give a numerical example about the cost-sharing of ecological construction in Fujian Province in China to show the validity, applicability, and advantages of the proposed model and method.

  19. An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)

    Science.gov (United States)

    2013-03-01

    construction firms ( Molenaar et al. 1999). The design-build+ method is a form of DB which brings the contractor into the planning phase early to help...of firm fixed prices requires the contractor to commit to a set price early in the design process ( Molenaar et al. 1999). Both firm fixed and cost...Research The performance of MILCON projects based on execution method has been investigated in terms of cost, performance, and schedule. Molenaar

  20. Case study of the effects of public safety regulation on the construction costs of coal-fired and nuclear power plants

    International Nuclear Information System (INIS)

    Morris, C.D.

    1987-01-01

    Regulations intended to reduce the number of accidents at nuclear plants and the discharge of sulfur and particulate wastes at coal-fired power plants have become an important cause of construction cost escalation. Measuring the costs of these regulatory interventions is a difficult research task. The three-unit Bruce Mansfield coal-fired plant and the two-unit Beaver Valley nuclear power station located in Shippingport, Pennsylvania, provide a unique opportunity for a case study of the costs of regulation in the construction of both kinds of plants. The units of each plant were built sequentially over a period of intensifying regulation. The method used to measure the costs of public safety regulation in the construction of each kind of plant is to determine the connections between the issuances of the regulatory agencies (EPA and NRC) and cost escalations of succeeding units. The small cost escalations of the Mansfield 3 unit, in comparison to the massive costs of the Beaver Valley 2 unit, suggest that the design and construction of new coal-fired plants are not disrupted by regulatory interventions nearly as extensively as are nuclear units. Certain technical features of Beaver Valley 2, especially its small size and a design that is identical to the first unit's, further contribute to its cost escalations

  1. Preparation and properties of hybrid materials for high-rise constructions

    Directory of Open Access Journals (Sweden)

    Matseevich Tatyana

    2018-01-01

    Full Text Available The theme of the research is important because it allows to use hybrid materials as finishing in the high-rise constructions. The aim of the study was the development of producing coloured hybrid materials based on liquid glass, a polyisocyanate, epoxy resin and 2.4-toluylenediisocyanate. The detailed study of the process of stress relaxation at different temperatures in the range of 20-100°C was provided. The study found that the obtained materials are subject to the simplified technology. The materials easy to turn different colors, and dyes (e.g. Sudan blue G are the catalysts for the curing process of the polymeric precursors. The materials have improved mechanical relaxation properties, possess different color and presentable, can be easily combined with inorganic base (concrete, metal. The limit of compressive strength varies from 32 to 17.5 MPa at a temperature of 20 to 100°C. The values σ∞ are from 20.4 to 7.7 MPa within the temperature range from 20 to 100°C. The physical parameters of materials were evaluated basing on the data of stress relaxation: the initial stress σ0, which occurs at the end of the deformation to a predetermined value; quasi-equilibrium stress σ∞, which persists for a long time relaxation process. Obtained master curves provide prediction relaxation behavior for large durations of relaxation. The study obtained new results. So, the addition of epoxy resin in the composition of the precursor improves the properties of hybrid materials. By the method of IR spectroscopy identified chemical transformations in the course of obtaining the hybrid material. Evaluated mechanical performance of these materials is long-time. Applied modern physically-based memory functions, which perfectly describe the stress relaxation process.

  2. Preparation and properties of hybrid materials for high-rise constructions

    Science.gov (United States)

    Matseevich, Tatyana

    2018-03-01

    The theme of the research is important because it allows to use hybrid materials as finishing in the high-rise constructions. The aim of the study was the development of producing coloured hybrid materials based on liquid glass, a polyisocyanate, epoxy resin and 2.4-toluylenediisocyanate. The detailed study of the process of stress relaxation at different temperatures in the range of 20-100°C was provided. The study found that the obtained materials are subject to the simplified technology. The materials easy to turn different colors, and dyes (e.g. Sudan blue G) are the catalysts for the curing process of the polymeric precursors. The materials have improved mechanical relaxation properties, possess different color and presentable, can be easily combined with inorganic base (concrete, metal). The limit of compressive strength varies from 32 to 17.5 MPa at a temperature of 20 to 100°C. The values σ∞ are from 20.4 to 7.7 MPa within the temperature range from 20 to 100°C. The physical parameters of materials were evaluated basing on the data of stress relaxation: the initial stress σ0, which occurs at the end of the deformation to a predetermined value; quasi-equilibrium stress σ∞, which persists for a long time relaxation process. Obtained master curves provide prediction relaxation behavior for large durations of relaxation. The study obtained new results. So, the addition of epoxy resin in the composition of the precursor improves the properties of hybrid materials. By the method of IR spectroscopy identified chemical transformations in the course of obtaining the hybrid material. Evaluated mechanical performance of these materials is long-time. Applied modern physically-based memory functions, which perfectly describe the stress relaxation process.

  3. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  4. Towards a tipping point in responding to change: rising costs, fewer options for Arctic and global societies.

    Science.gov (United States)

    Huntington, Henry P; Goodstein, Eban; Euskirchen, Eugénie

    2012-02-01

    Climate change incurs costs, but government adaptation budgets are limited. Beyond a certain point, individuals must bear the costs or adapt to new circumstances, creating political-economic tipping points that we explore in three examples. First, many Alaska Native villages are threatened by erosion, but relocation is expensive. To date, critically threatened villages have not yet been relocated, suggesting that we may already have reached a political-economic tipping point. Second, forest fires shape landscape and ecological characteristics in interior Alaska. Climate-driven changes in fire regime require increased fire-fighting resources to maintain current patterns of vegetation and land use, but these resources appear to be less and less available, indicating an approaching tipping point. Third, rapid sea level rise, for example from accelerated melting of the Greenland ice sheet, will create a choice between protection and abandonment for coastal regions throughout the world, a potential global tipping point comparable to those now faced by Arctic communities. The examples illustrate the basic idea that if costs of response increase more quickly than available resources, then society has fewer and fewer options as time passes.

  5. Making Hay When It Rains: The Effect Prevailing Wage Regulations, Scale Economies, Seasonal, Cyclical and Local Business Patterns Have On School Construction Costs.

    Science.gov (United States)

    Azari-Rad, Hamid; Philips, Peter; Prus, Mark

    2002-01-01

    Examines several alternative ways for school districts to reduce the construction costs of new facilities. Finds that spacing out the start of facility construction projects and building during economic downturns in the construction industry offer the best options for construction cost savings. (PKP)

  6. Review of nuclear power costs around the world

    International Nuclear Information System (INIS)

    Bennett, L.L.; Karousakis, P.M.; Moynet, G.

    1983-01-01

    This paper presents highlights of nuclear power costs around the world from studies carried out by the IAEA and by UNIPEDE. Emphasis is placed on trends within each country of key parameters which affect both investment costs and total power generation costs, including construction and project durations, size of units, regulatory environment, scope of project, fuel cycle costs and general economic conditions. A synthesis of these trends, taking into consideration both nuclear and coal-fired plant capital and fuel costs as they are estimated to evolve in the near and medium term, is presented in terms of nuclear-to-coal cost ratios for both plant investment costs and total generating costs. The plant investment costs are expressed as ''overnight'' or ''fore'' costs, in constant money, for plants expected to enter commercial operation in the early 1990s. Pertinent assumptions are based on conditions prevailing in the particular country under review. These studies indicate that in most countries nuclear plant investment costs are rising more rapidly than the costs for coal-fired plants. A major cause for the rapid rise in nuclear plant costs is the drastic lengthening of project duration in most countries. France, as a notable exception, has been able to maintain a stable and reasonably short project time. In spite of the rapidly escalating nuclear plant investment costs, nuclear electricity generation has an economic advantage over coal in Europe and Canada and is competitive with coal in the eastern and midwestern parts of the United States of America (USA). The availability of abundant, low-cost coal gives coal-fired generation an economic advantage in the western USA. (author)

  7. Methodology for reducing energy and resource costs in construction of trenchless crossover of pipelines

    Science.gov (United States)

    Toropov, V. S.

    2018-05-01

    The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.

  8. Labor productivity adjustment factors. A method for estimating labor construction costs associated with physical modifications to nuclear power plants

    International Nuclear Information System (INIS)

    Riordan, B.J.

    1986-03-01

    This report develops quantitative labor productivity adjustment factors for the performance of regulatory impact analyses (RIAs). These factors will allow analysts to modify ''new construction'' labor costs to account for changes in labor productivity due to differing work environments at operating reactors and at reactors with construction in progress. The technique developed in this paper relies on the Energy Economic Data Base (EEDB) for baseline estimates of the direct labor hours and/or labor costs required to perform specific tasks in a new construction environment. The labor productivity cost factors adjust for constraining conditions such as working in a radiation environment, poor access, congestion and interference, etc., which typically occur on construction tasks at operating reactors and can occur under certain circumstances at reactors under construction. While the results do not portray all aspects of labor productivity, they encompass the major work place conditions generally discernible by the NRC analysts and assign values that appear to be reasonable within the context of industry experience. 18 refs

  9. Cost Behavior

    DEFF Research Database (Denmark)

    Hoffmann, Kira

    The objective of this dissertation is to investigate determinants and consequences of asymmetric cost behavior. Asymmetric cost behavior arises if the change in costs is different for increases in activity compared to equivalent decreases in activity. In this case, costs are termed “sticky......” if the change is less when activity falls than when activity rises, whereas costs are termed “anti-sticky” if the change is more when activity falls than when activity rises. Understanding such cost behavior is especially relevant for decision-makers and financial analysts that rely on accurate cost information...... to facilitate resource planning and earnings forecasting. As such, this dissertation relates to the topic of firm profitability and the interpretation of cost variability. The dissertation consists of three parts that are written in the form of separate academic papers. The following section briefly summarizes...

  10. High-rise housing as a factor of the increase in Investment attractiveness of the city

    Science.gov (United States)

    Mottaeva, Angela; Zheltenkov, Alexander

    2018-03-01

    That is obviously for experts, irrespective of status or quality, high-rise housing is here to stay. No country is in a position to ignore or discard this conspicuous legacy of the post-war and mass housing period. Nevertheless, high-rise residential buildings are still less widespread, than offices. According to the author, there are certain problems and reasons for limitation of high-rise construction in the housing sector. The author summarizes successful experience of high-rise housing construction in the world and considers some social-and-economic prerequisites of its development in the modern city. These concrete examples, given in article, prove that the existing problems are being solved. The most effective option of construction is the combination of inhabited and commercial chambers in the high-rise building and also the creation of specific infrastructure. In that case housing high-rise estates will promote the increase in investment attractiveness and investment activity in the district and in the city as whole.

  11. The improvement of thermal characteristics of autoclave aerated concrete for energy efficient high-rise buildings application

    Science.gov (United States)

    Khavanov, Pavel; Fomina, Ekaterina; Kozhukhova, Natalia

    2018-03-01

    Nowadays, the problem of energy saving is very relevant. One of the ways to reduction energy consumption in construction materials production and construction of civil and industrial high-rise buildings is the application of claddings with heat-insulating performance. The concept of energy efficiency of high-rise buildings is closely related to environmental aspect and sustainability of applied construction materials; reducing service costs; energy saving and microclimate comfortability. A complexity of architectural and structural design as well as aesthetic characteristics of construction materials are also should be considered. The high interest focused on materials with combined properties. This work is oriented on the study of energy efficiency of buildings by improving heat-insulation and strength performance of autoclave aerated concrete. The applied method of sulfate activation of lime allows monitoring phase and structure formation in aerated concrete. The optimal mix design of aerated concrete with the compressive strength up to 8.5 MPa and decreased density up to 760 kg/m3 was proposed. Analysis of structure at macro-and microscale was performed as well as the criteria of an optimal porosity formation was considered a number, size, shape of pore and density of interior partition. SEM analysis and BET method were performed in this research work. The research results demonstrated the correlation between structure and vapor permeability resistance, also it was found that the increase of strength can lead to reduction of thermal conductivity.

  12. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    Science.gov (United States)

    El-Alaily, T. M.; El-Nimr, M. K.; Saafan, S. A.; Kamel, M. M.; Meaz, T. M.; Assar, S. T.

    2015-07-01

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability.

  13. An Enterprise Model of Rising Ship Costs: Loss of Learning Due to Time between Ships and Labor Force Instability

    OpenAIRE

    Summerville, Jessica R.; Cullis, Bethia L.; Druker, Eric R.; Rutledge, Gabriel B.; Braxton, Peter J.; Coleman, Richard L.

    2007-01-01

    Proceedings Paper (for Acquisition Research Program) Since the end of the Cold War, the perceived need for Navy ships has dropped, and so the shipbuilding budget has dropped. Seemingly coincidental with this budgetary pressure, and perversely aggravating the problem, ship costs began to rise steeply. We will set aside that ships have grown in weight by about three percent per year since World War II and that ever-more weapon systems are being put into them, and confine ourselves to discu...

  14. Cost Control Strategies for Zero Energy Buildings: High-Performance Design and Construction on a Budget (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2014-09-01

    There is mounting evidence that zero energy can, in many cases, be achieved within typical construction budgets. To ensure that the momentum behind zero energy buildings and other low-energy buildings will continue to grow, this guide assembles recommendations for replicating specific successes of early adopters who have met their energy goals while controlling costs. Contents include: discussion of recommended cost control strategies, which are grouped by project phase (acquisition and delivery, design, and construction) and accompanied by industry examples; recommendations for balancing key decision-making factors; and quick reference tables that can help teams apply strategies to specific projects.

  15. Effect of Rice Husk Ash and Fly Ash on the workability of concrete mixture in the High-Rise Construction

    Science.gov (United States)

    Van Tang, Lam; Bulgakov, Boris; Bazhenova, Sofia; Aleksandrova, Olga; Pham, Anh Ngoc; Dinh Vu, Tho

    2018-03-01

    The dense development of high-rise construction in urban areas requires a creation of new concretes with essential properties and innovative technologies for preparing concrete mixtures. Besides, it is necessary to develop new ways of presenting concrete mixture and keeping their mobility. This research uses the mathematical method of two-factors rotatable central compositional planning to imitate the effect of amount of rice husk (RHA) and fly ash of thermal power plants (FA) on the workability of high-mobility concrete mixtures. The results of this study displays regression equation of the second order dependence of the objective functions - slump cone and loss of concrete mixture mobility due to the input factors - the amounts RHA (x1) and FA (x2), as well as the surface expression image of these regression equations. An analysis of the regression equations also shows that the amount of RHA and FA had a significant influence on the concrete mixtures mobility. In fact, the particles of RHA and FA will play the role as peculiar "sliding bearings" between the grains of cement leading to the dispersion of cement in the concrete mixture. Therefore, it is possible to regulate the concrete mixture mobility when transporting fresh concrete to the formwork during the high-rise buildings construction in the hot and humid climate of Vietnam. Although the average value of slump test of freshly mixed concrete, measured 60 minutes later after the mixing completion, decreased from 18.2 to 10.52 cm, this value still remained within the allowable range to maintain the mixing and and the delivery of concrete mixture by pumping.

  16. Rising Long-term Interest Rates

    DEFF Research Database (Denmark)

    Hallett, Andrew Hughes

    Rather than chronicle recent developments in European long-term interest rates as such, this paper assesses the impact of increases in those interest rates on economic performance and inflation. That puts us in a position to evaluate the economic pressures for further rises in those rates......, the first question posed in this assignment, and the scope for overshooting (the second question), and then make some illustrative predictions of future interest rates in the euro area. We find a wide range of effects from rising interest rates, mostly small and mostly negative, focused on investment...... till the emerging European recovery is on a firmer basis and capable of overcoming increases in the cost of borrowing and shrinking fiscal space. There is also an implication that worries about rising/overshooting interest rates often reflect the fact that inflation risks are unequally distributed...

  17. Two-stage commercial evaluation of engineering systems production projects for high-rise buildings

    Science.gov (United States)

    Bril, Aleksander; Kalinina, Olga; Levina, Anastasia

    2018-03-01

    The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.

  18. Two-stage commercial evaluation of engineering systems production projects for high-rise buildings

    Directory of Open Access Journals (Sweden)

    Bril Aleksander

    2018-01-01

    Full Text Available The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.

  19. Rising energy prices and the economics of water in agriculture

    NARCIS (Netherlands)

    Zilberman, D.; Sproul, T.; Rajagopal, D.; Sexton, S.; Hellegers, P.J.G.J.

    2008-01-01

    Rising energy prices will alter water allocation and distribution. Water extraction and conveyance will become more costly and demand for hydroelectric power will grow. The higher cost of energy will substantially increase the cost of groundwater, whereas increasing demand for hydroelectric power

  20. The use of methods of structural optimization at the stage of designing high-rise buildings with steel construction

    Science.gov (United States)

    Vasilkin, Andrey

    2018-03-01

    The more designing solutions at the search stage for design for high-rise buildings can be synthesized by the engineer, the more likely that the final adopted version will be the most efficient and economical. However, in modern market conditions, taking into account the complexity and responsibility of high-rise buildings the designer does not have the necessary time to develop, analyze and compare any significant number of options. To solve this problem, it is expedient to use the high potential of computer-aided designing. To implement automated search for design solutions, it is proposed to develop the computing facilities, the application of which will significantly increase the productivity of the designer and reduce the complexity of designing. Methods of structural and parametric optimization have been adopted as the basis of the computing facilities. Their efficiency in the synthesis of design solutions is shown, also the schemes, that illustrate and explain the introduction of structural optimization in the traditional design of steel frames, are constructed. To solve the problem of synthesis and comparison of design solutions for steel frames, it is proposed to develop the computing facilities that significantly reduces the complexity of search designing and based on the use of methods of structural and parametric optimization.

  1. Open-source digital technologies for low-cost monitoring of historical constructions

    OpenAIRE

    Basto, Camilo; Pelà, Luca; Chacón Flores, Rolando Antonio

    2017-01-01

    This paper shows new possibilities of using novel, open-source, low-cost platforms for the structural health monitoring of heritage structures. The objective of the study is to present an assessment of increasingly available open-source digital modeling and fabrication technologies in order to identify the suitable counterparts of the typical components of a continuous static monitoring system for a historical construction. The results of the research include a simple case-study, which is pre...

  2. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    Science.gov (United States)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  3. THE EFFECT OF EXCHANGE RATE ON THE CONSTRUCTION PROJECTS AND PROTECTION METHODS

    Directory of Open Access Journals (Sweden)

    Handan AKSUYEK,

    2017-02-01

    Full Text Available As with all sectors, recent extreme changes occurred in the exchange rates have substantially affected the construction operations. While the rise in foreign exchange rates leads to harmful effects in the negative direction at the operations having foreign exchange – based debt or it provides also advantageous effect in the positive direction at the construction companies having foreign exchange – indexed investments. In this context, this sudden change in foreign exchange rates which cannot be predicted beforehand and emerges as a result of speculative events. As with all operations carrying out foreign exchange – based tasks, these fluctuations in the foreign exchange rate head first among the factors which affect the achievement or failure of the cost or profit targets previously determined by the construction companies as well. Therefore, the companies whose costs and profits consist of different units of currency in their construction agreements should apply to the hedging methods in order to be protected against the exchange rate. As for the main tools of protection method are the derivative products such as forward, futures, swap and optional contracts. In this study, the effect of exchange rate fluctuations on the completion costs of construction projects is scrutinized. Moreover, the tools which may be employed by the construction companies in order to get rid of exchange rate which adversely influence the building companies in both directions have been comparatively evaluated.

  4. Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem

    2015-02-01

    Full Text Available This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects. Meanwhile, the research has determined the percentage of project items, in such a remote environment. Estimation equations suitable for remote areas have been formulated. Moreover, a procedure for unite price calculation is concluded.

  5. The rise and fall of V4334 Sagittarii (Sakurai's object)

    NARCIS (Netherlands)

    Duerbeck, HW; Liller, W; Sterken, C; Benetti, S; van Genderen, AM; Arts, J; Kurk, JD; Janson, M; Voskes, T; Brogt, E; Arentoft, T; Dijkstra, R

    CCD UBVRi photometry of the final helium flash object V4334 Sgr (Sakurai's object) carried out during 1997-1999 is presented, and the light curve from its prediscovery rise to the dust obscuration phase is constructed. The optical light curve can be divided into four sections, the rise to maximum,

  6. A construction process model for implementing constructability in construction

    NARCIS (Netherlands)

    Langkemper, J.; Al-Jibouri, S.; Reymen, I.M.M.J.; Maas, G.J.; Gassel, van F.

    2003-01-01

    In construction, failure of design professionals to consider how a builder will implement the design can result in scheduling problems, cost escalation, delays and disputes during the construction process. The integration of construction knowledge and experience during planning and design is termed

  7. The Impact of High-Rise Buildings on the Living Environment

    Directory of Open Access Journals (Sweden)

    Giyasov Botir

    2018-01-01

    Full Text Available Urbanization as a socio-economic process manifested in the concentration of the population in modern big cities contributes to the development of high-rise building construction. With the development of education and culture, changing leisure habits, city residents put forward new architectural and functional requirements to the living environment and urban infrastructure. This calls for the creation of new types and forms of residential buildings, the structure of the city and transport networks. In addition, the need to develop high-rise building construction is justified by the growing demand for residential, public and administrative buildings and the lack of free space.The paper analyzes the development of high-rise building construction in urban areas. The problem of the impact of high-rise building construction in big cities on the living environment is considered. Using analytical methods, causes and sources of pollution, such as transport and engineering infrastructure have been identified. In some urban areas, there are zones with modified thermal conditions and air exchange resulting in the formation of the “urban heat island”The qualitative and quantitative characteristics of variations in temperature and wind speed with respect to the height of the building have been calculated, using the example of the Evolution Tower of the Moscow International Business Center (“Moscow City”. Calculation and comparative analysis for the cities of Moscow, Khanty-Mansiysk and Vladivostok has made it possible to assess the variation in temperature and wind speed and their impact on the living environment under different climatic conditions.

  8. The Impact of High-Rise Buildings on the Living Environment

    Science.gov (United States)

    Giyasov, Botir; Giyasova, Irina

    2018-03-01

    Urbanization as a socio-economic process manifested in the concentration of the population in modern big cities contributes to the development of high-rise building construction. With the development of education and culture, changing leisure habits, city residents put forward new architectural and functional requirements to the living environment and urban infrastructure. This calls for the creation of new types and forms of residential buildings, the structure of the city and transport networks. In addition, the need to develop high-rise building construction is justified by the growing demand for residential, public and administrative buildings and the lack of free space.The paper analyzes the development of high-rise building construction in urban areas. The problem of the impact of high-rise building construction in big cities on the living environment is considered. Using analytical methods, causes and sources of pollution, such as transport and engineering infrastructure have been identified. In some urban areas, there are zones with modified thermal conditions and air exchange resulting in the formation of the "urban heat island"The qualitative and quantitative characteristics of variations in temperature and wind speed with respect to the height of the building have been calculated, using the example of the Evolution Tower of the Moscow International Business Center ("Moscow City"). Calculation and comparative analysis for the cities of Moscow, Khanty-Mansiysk and Vladivostok has made it possible to assess the variation in temperature and wind speed and their impact on the living environment under different climatic conditions.

  9. Greenhouse effect, sea level rise, and coastal drainage systems

    Energy Technology Data Exchange (ETDEWEB)

    Titus, J G; Kuo, C Y; Gibbs, M J; LaRoche, T B; Webb, M K; Waddell, J O

    1987-01-01

    Increasing concentrations of carbon dioxide and other gases are expected to warm the earth several degrees in the next century, which would raise sea level a few feet and alter precipitation patterns. Both of these changes would have major impacts on the operation of coastal drainage systems. However, because sea level rise and climate change resulting from the greenhouse effect are still uncertain, most planners and engineers are ignoring the potential implications. Case studies of the potential impact on watersheds in Charleston, South Carolina, and Fort Walton Beach, Florida, suggest that the cost of designing a new system to accommodate a rise in sea level will sometimes be small compared with the retrofit cost that may ultimately be necessary if new systems are not designed for a rise. Rather than ignore the greenhouse effect until its consequences are firmly established, engineers and planners should evaluate whether it would be worthwhile to insure that new systems are not vulnerable to the risks of climate change and sea level rise.

  10. Application Of The Work Breakdown Structure In Determining Cost Buffers In Construction Schedules

    Directory of Open Access Journals (Sweden)

    Połoński M.

    2015-03-01

    Full Text Available The paper presents methods of determining the location of cost buffers and corresponding contingency costs in the CPM schedule based on its work breakdown structure. Application of correctly located cost buffers with appropriately established reserve costs is justified by the common overrunning of scheduled costs in construction projects. Interpolated cost buffers (CB as separate tasks have been combined with relevant summary tasks by the start–to–start (SS relationship, whereas the time of their execution has been dynamically connected with the time of accomplishment of particular summary tasks using the “paste connection” option. Besides cost buffers linked with the group of tasks assigned to summary tasks, a definition of the cost buffer for the entire project (PCB has been proposed, i.e. as one initial task of the entire project. Contingency costs corresponding to these buffers, depending on the data that the planner has at his disposal, can be determined using different methods, but always depend on the costs of all tasks protected by each buffer. The paper presents an exemplary schedule for a facility and the method of determining locations and cost for buffers CB and PCB, as well as their influence on the course of the curve illustrating the budgeted cost of work scheduled (BCWS. The proposed solution has been adjusted and presented with consideration of the possibilities created by the scheduling software MS Project, though its general assumptions may be implemented with application of other similar specialist tools.

  11. The influence of management and construction methods in the repair costs of Spain’s low-volume road network

    Directory of Open Access Journals (Sweden)

    Eutiquio Gallego

    2016-06-01

    Full Text Available This paper describes the entire process of the implementation of the Spanish low volume road network, including the design criteria, the construction techniques and the management policies during all the periods. The current situation of low volume roads in Spain was analyzed with respect to the legal framework and their actual condition. In addition, the budget required for the repair of 41 low volume roads throughout Spain was calculated in order to statistically analyze the influence of the pavement materials and the period of construction. The main conclusions were that low volume roads constructed during the 1970´s are currently those in the best state of repair and those requiring the lower repair costs, even lower than those constructed after 1980´s. In addition, low volume roads constructed with higher quality materials and using standardized techniques required five times lower repair costs than those made of lower quality materials.

  12. PERSONNEL COSTS IN THE CZECH CONSTRUCTION SECTOR: INVESTIGATING THE EFFECT OF COMPANY SIZE

    Directory of Open Access Journals (Sweden)

    Martina Paulišová

    2017-01-01

    Full Text Available : Managing personnel costs is important in all companies, especially in those whose production is labor intensive. The construction sector therefore qualifies as a suitable area for analyzing issues associated with these costs. The aim of this study is to find out whether company size affects personnel cost management under various circumstances. Four research hypotheses focus on the relationships among and the relative importance of personnel costs, use of standards, range of employee benefits offered, and economic actions taken when faced with an economic crisis. The evaluation of hypotheses is supported by using the chi-square test of independence with the aim of confirming or rejecting the statistical significance of relationships between the examined categorical variables. Results have confirmed a significant effect of company size. Several research implications and suggested future research directions are also presented in the conclusion of this paper.

  13. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms

    Directory of Open Access Journals (Sweden)

    Youngsoo Jung

    2015-01-01

    Full Text Available As the owners expect that the cost and time for nuclear power plant construction would decrease with new entrants into the market, there will be severer competition in the nuclear industry. In order to achieve performance improvement and to attain competitive advantages under the globalized competition, practitioners and researchers in the nuclear industry have recently exerted efforts to develop an advanced and efficient management methodology for the nuclear mega-projects. Among several candidates, integrated cost and schedule control system is of great concern because it can effectively manage the three most important project performances including cost, time, and quality. In this context, the purpose of this paper is to develop a project numbering system (PNS of integrated cost and schedule control system for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first in order to identify influencing variables that characterize real-world implementation of advanced cost and schedule controls. A scenario was then developed and analysed to simulate a case-project. By using this case-project, proposed management requirements, management methods, measurement techniques, data structure, and data collection methods for integrated cost and schedule PNS were illustrated. Finally, findings and implications are outlined, and recommendations for further research are presented.

  14. Cost of and soil loss on "minimum-standard" forest truck roads constructed in the central Appalachians

    Science.gov (United States)

    J. N. Kochenderfer; G. W. Wendel; H. Clay Smith

    1984-01-01

    A "minimum-standard" forest truck road that provides efficient and environmentally acceptable access for several forest activities is described. Cost data are presented for eight of these roads constructed in the central Appalachians. The average cost per mile excluding gravel was $8,119. The range was $5,048 to $14,424. Soil loss was measured from several...

  15. A framework of initiatives for successful application of life cycle costing (LCC in industrialised building system (IBS in Malaysian construction industry

    Directory of Open Access Journals (Sweden)

    Shamsuddin Siti Mazzuana

    2017-01-01

    Full Text Available Industrialised Building System (IBS contributes a great shift in sustainable construction and benefits the society. Previous studies have proven in general that one of the hindrances in promoting sustainable in IBS, is a high cost for any pre-cast material specifically thus effected the overall cost. The introduction of Life Cycle Costing (LCC leads into providing a better and comprehensive cost estimation, including projecting actual cost to operate the building, hence providing a better baseline for decision making. The lacking application of LCC in IBS is still in trivial impact, therefore, this paper presents a framework which produced by expressing the successful initiatives of LCC and IBS in Malaysia construction industry. The framework developed based on findings from the extensive literature reviews, 164 responded questionnaires, and 19 expert opinions, which has three sections: Strategy Development, System Development and the last part is Decision Level. Aspects of objectivity, practicality, reliability, completeness that were likely to be implemented in the Malaysian construction industry were used. There are significant opinions on the usefulness and completeness of the proposed framework in providing a comprehensive cost estimates which helps much in deciding to carry out IBS or remain with a traditional construction method.

  16. Subnanosecond-rise-time, low-impedance pulse generator

    International Nuclear Information System (INIS)

    Druce, R.; Vogtlin, G.

    1983-01-01

    This paper describes a fast rise, low-impedance pulse generator that has been developed at the Lawrence Livermore National Laboratory. The design specifications of this generator are: 50-kV operating voltage, 1-ohm output impedance, subnanosecond rise time, and a 2 to 10 nanosecond pulse length. High repetition rate is not required. The design chosen is a parallel-plate, folded Blumlein generator. A tack switch is utilized for its simple construction and high performance. The primary diagnostic is a capacitive voltage divider with a B probe used to measure the current waveform

  17. Subnanosecond-rise-time, low-impedance pulse generator

    Energy Technology Data Exchange (ETDEWEB)

    Druce, R.; Vogtlin, G.

    1983-06-03

    This paper describes a fast rise, low-impedance pulse generator that has been developed at the Lawrence Livermore National Laboratory. The design specifications of this generator are: 50-kV operating voltage, 1-ohm output impedance, subnanosecond rise time, and a 2 to 10 nanosecond pulse length. High repetition rate is not required. The design chosen is a parallel-plate, folded Blumlein generator. A tack switch is utilized for its simple construction and high performance. The primary diagnostic is a capacitive voltage divider with a B probe used to measure the current waveform.

  18. Subnanosecond-rise-time, low-impedance pulse generator

    Science.gov (United States)

    Druce, R.; Vigtlin, G.

    1983-06-01

    A fast rise, low impedance pulse generator developed at the Lawrence Livermore National Laboratory is described. The design specifications of this generator are: 50-kV operating voltage, 1-ohm output impedance, subnanosecond rise time, and a 2 to 10 nanosecond pulse length. High repetition rate is not required. The design chosen is a parallel plate, folded Blumlein generator. A tack switch is utilized for its simple construction and high performance. The primary diagnostic is a capacitive voltage divider with a B probe used to measure the current waveform.

  19. Sustainable Construction Risk Perceptions in the Kuwaiti Construction Industry

    Directory of Open Access Journals (Sweden)

    Dalya Ismael

    2018-06-01

    Full Text Available Sustainable construction is fundamentally different than traditional construction because it requires whole systems thinking, early collaboration across stakeholders, and core principles like reducing resource consumption, eliminating toxins, and applying life cycle costing. Construction professionals unfamiliar with this mindset and approach may perceive sustainable construction as risky. One of the global regions in need of more sustainable construction is the Middle Eastern and North African (MENA region. The MENA region is one of the fastest developing in the world. However, it is the slowest one in implementing sustainable construction practices. Kuwait, in particular, contributes 53% more carbon emissions per capita than the United States. To understand how the Kuwaiti construction industry perceives risks associated with more sustainable construction, a survey was developed with 52 risk elements in which 131 industry professionals responded. The results indicate that industry professionals perceive a lack of public awareness as the risk element with the highest probability of occurrence. The risk element with the highest possible negative impact on future projects is designers’ and contractors’ inexperience with sustainable construction. Other risks were found to include a high initial cost for materials and overall project costs. Educational interventions, changes in risk allocation, and behavioral science to reframe upfront costs as long-term savings are offered as possible solutions.

  20. Design Optimization and Construction of the Thyratron/PFN Based Cost Model Modulator for the NLC

    International Nuclear Information System (INIS)

    Koontz, Roland F

    1999-01-01

    As design studies and various R and D efforts continue on Next Linear Collider (NLC) systems, much R and D work is being done on X-Band klystron development, and development of pulse modulators to drive these X-Band klystrons. A workshop on this subject was held at SLAC in June of 1998, and a follow-up workshop is scheduled at SLAC June 23-25, 1999. At the 1998 workshop, several avenues of R and D were proposed using solid state switching, induction LINAC principles, high voltage hard tubes, and a few more esoteric ideas. An optimized version of the conventional thyratron-PFN-pulse transformer modulator for which there is extensive operating experience is also a strong candidate for use in the NLC. Such a modulator is currently under construction for base line demonstration purposes. The performance of this ''Cost Model'' modulator will be compared to other developing technologies. Important parameters including initial capital cost, operating maintenance cost, reliability, maintainability, power efficiency, in addition to the usual operating parameters of pulse flatness, timing and pulse height jitter, etc. will be considered in the choice of a modulator design for the NLC. This paper updates the progress on this ''Cost Model'' modulator design and construction

  1. The future cost of cancer in South Africa: An interdisciplinary cost management strategy.

    Science.gov (United States)

    Sartorius, K; Sartorius, B; Govender, P S; Sharma, V; Sherriff, A

    2016-09-06

    The exponential rise in cancer costs in South Africa (SA) was illustrated in a recent Sunday Times article entitled 'The cost of cancer can be a debt sentence'. Our Minister of Health talks of a 'war' against the high costs of cancer drugs, and epidemiologists project a sharply rising incidence. Eminent international medical journals, such as The Lancet, underline the fact that cancer cost is a growing international problem that confronts even the richest countries. If richer countries in the world are battling to cover the costs of cancer, what is the prognosis for SA?

  2. 46 CFR 111.20-5 - Temperature rise.

    Science.gov (United States)

    2010-10-01

    ... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-5 Temperature rise. (a) The... than 40 degrees C, the transformer must be derated so that the total temperature stated in this section...

  3. Modern methods of cost saving of the production activity in construction

    Science.gov (United States)

    Silka, Dmitriy

    2017-10-01

    Every time economy faces recession, cost saving questions acquire increased urgency. This article shows how companies of the construction industry have switched to the new kind of economic relations over recent years. It is specified that the dominant type of economic relations does not allow to quickly reorient on the necessary tools in accordance with new requirements of economic activity. Successful experience in the new environment becomes demanded. Cost saving methods, which were proven in other industries, are offered for achievement of efficiency and competitiveness of the companies. Analysis is performed on the example of the retail sphere, which, according to the authoritative analytical reviews, is extremely innovative on both local and world economic levels. At that, methods, based on the modern unprecedentedly high opportunities of communications and informational exchange took special place among offered methods.

  4. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    Science.gov (United States)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  5. Estimation of resource savings due to fly ash utilization in road construction

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Subodh; Patil, C.B. [Centre for Energy Studies, Indian Institute of Technology, New Delhi 110016 (India)

    2006-08-15

    A methodology for estimation of natural resource savings due to fly ash utilization in road construction in India is presented. Analytical expressions for the savings of various resources namely soil, stone aggregate, stone chips, sand and cement in the embankment, granular sub-base (GSB), water bound macadam (WBM) and pavement quality concrete (PQC) layers of fly ash based road formation with flexible and rigid pavements of a given geometry have been developed. The quantity of fly ash utilized in these layers of different pavements has also been quantified. In the present study, the maximum amount of resource savings is found in GSB followed by WBM and other layers of pavement. The soil quantity saved increases asymptotically with the rise in the embankment height. The results of financial analysis based on Indian fly ash based road construction cost data indicate that the savings in construction cost decrease with the lead and the investment on this alternative is found to be financially attractive only for a lead less than 60 and 90km for flexible and rigid pavements, respectively. (author)

  6. Cost-effectiveness analysis of surface flow constructed wetlands (SFCW) for nutrient reduction in drainage discharge from agricultural fields in Denmark

    DEFF Research Database (Denmark)

    Gachango, Florence Gathoni; Pedersen, Søren Marcus; Kjærgaard, Charlotte

    2015-01-01

    Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies......, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients...... reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW...

  7. Factors Affecting Competitive Strategies in International Construction Companies

    Directory of Open Access Journals (Sweden)

    Tuğçe ERCAN

    2013-02-01

    Full Text Available Due to rising competition in the international construction market, competitive strategies are becoming ever more important. This study aims to identify the level of importance of a variety of competitive strategies in construction companies to create a theoretical framework for competitive strategies in international construction business. In the questionnaire titled: ‘Identifying the Parameters of Strategic Performance Comparison Tool in International Construction Companies’, professionals were asked the level of importance of parameters in acquiring a competitive edge in international markets for construction companies. 82 people who currently work for international construction companies responded the questionnaire. The Relative Importance Index (RII of competitive strategies in construction companies was calculated using the survey results. The construct was redesigned through the Pearson Correlation and principal components analysis (PCA. The results of the PCA denoted that the construct of competitive strategies in construction companies can be explained by three main factors in sync with Porter’s three generic competitive strategy types: F1 Cost Leadership in Construction, F2 Specialization and Focus and F3 Differentiation in Construction and Company Resources. The analysis results show that the competitive strategies related to “Differentiation in Construction and Company Resources” have a greater importance level, while the diversification strategies have a lower importance level. Which means specialization in some type of construction activity and focus on a specific group of customers is more effective than diversification strategies in gaining a competitive advantage in the market.

  8. Construction of low-cost, Mod-OA wood composite wind turbine blades

    Science.gov (United States)

    Lark, R. F.

    1983-01-01

    Two sixty-foot, low-cost, wood composite blades for service on 200 kW Mod-OA wind turbines were constructed. The blades were constructed of epoxy resin-bonded Douglas fir veneers for the leading edge sections, and paper honeycombcored, birch plywood faced panels for the afterbody sections. The blades were joined to the wind turbine hub by epoxy resin-bonded steel load take-off studs embedded into the root end of the blades. The blades were installed on the 200 kW Mod-OA wind turbine facility at Kahuku, Hawaii, The blades completed nearly 8,000 hours of operation over an 18 month period at an average power of 150 kW prior to replacement with another set of wood composite blades. The blades were replaced because of a corrosion failure of the steel shank on one stud. Inspections showed that the wood composite structure remained in excellent condition.

  9. Analysis of noise on construction sites of high-rise buildings.

    Science.gov (United States)

    Barkokébas, Béda; Vasconcelos, Bianca M; Lago, Eliane Maria G; Alcoforador, Aline Fabiana P

    2012-01-01

    In the civil construction industry sector, it has been observed that the increasing use of machines has made tasks noisier and consequently caused hearing loss and had other adverse effects on workers. The objective of this study was to identify and assess the physical risks of noise present in activities undertaken in a construction company in order to propose control measures which will contribute to the management of health and safety within the company's organization. The methodology applied was based on verifying the characteristics of exposure to noise on construction sites, from an observation of sources which generated noise and making measurements of sound pressure levels emitted by these sources. The data was then analyzed and compared with the recommended performance levels established in control measures. As a result, it was found that some machines and equipment used in civil construction often generate noise above the acceptable levels and as such, in these cases, various control measures have been proposed. It is believed that the use of management techniques is the most effective way to assess risk and to implement the preventive and corrective actions proposed, and allows for the analysis of sound pressure levels on an ongoing basis.

  10. Weight and cost analysis of large wind turbine rotors constructed from conventional materials and from advanced composite materials

    Energy Technology Data Exchange (ETDEWEB)

    van Holten, Th

    1982-07-01

    Cost calculations and cost analyses of the blades and the (teetering) hubs of large wind turbines. The blades are of different shapes, construction and materials (aluminium, steel and glass reinforced plastics). Teetering hubs are heavy and complicated steel constructions, necessary to minimize material fatigue. In large wind turbines with a diameter of 60 to 100 m or even more the rotor mass (hubs and blades together) may vary from 46,000 to 216,000 kg. Costs are estimated to be DFL. 16/kg, both for teetering hubs and/or blades made of glass reinforced plastics. Due to lack of experience and of exact knowledge of the loads appearing during operation under field conditions the uncertainty factor may be 10% to 15%.

  11. On information and communication technology and production cost in construction industry: evidence from the Netherlands

    NARCIS (Netherlands)

    van der Vlist, A.J; Vrolijk, M.H.; Dewulf, Geert P.M.R.

    2014-01-01

    The interplay between information and communication technology (ICT) and the competitiveness of construction firms is considered. More specifically, the question is whether firms that invest in information and communication technology have a production cost advantage. The economics literature

  12. Nuclear power and global warming: a first cost-benefit calculation

    International Nuclear Information System (INIS)

    Hope, C.

    1994-01-01

    This paper investigates the costs and benefits of a modest nuclear power programme in the European Union to combat the threat of global warming. The nuclear programme is found to bring a double benefit. The first and more obvious benefit is that the economic impacts of global warming are reduced. The second benefit is counter-intuitive; most people would expect it to be a cost. It comes from the stimulus to the economy from the construction of the nuclear plant, which, with the recycling of carbon tax revenues, offsets its construction and operating costs, and may even cause consumers' expenditure to rise. Calculations in this paper show that over the period to 2100 the mean net present value of the first benefit is 6 billion European Currency Units (ECU; 1 ECU is about Dollars 1), while the second benefit has a mean net present value of 159 billion ECU. However both benefits, particularly the second, are still very uncertain, to the extent that even their sign is not yet definitely established. (author)

  13. Rising costs call for new European refining strategies

    International Nuclear Information System (INIS)

    Sweeney, B.N.C.

    1993-01-01

    The outlook for the global refining industry is for increased spending and reduced margins, largely because of efforts to improve the environment. A look at these trends through the end of the decade is thus in order. Three major industry thrusts are proposed to see refiners through this uncertain period. Three main thrusts are necessary: fixed costs must be reduced by re-engineering business processes and reexamining noncore business units against total and marginal costs. In this respect the best refiners are well ahead of the good ones. New cooperative ways of meeting regulations must be sought, to avoid wasteful over capacity. Joint ventures and alliances with competitors will be needed. The cooperative principle upstream must be extended and new strategies must be sought to meet product demand changes and reduce feedstock costs. The picture that is presented is tough, largely because of the wish to improve the environment. The question that must be continually reviewed is ''Have governments got the right balance in these regulations between the environment and the downstream industry?''

  14. Construction mathematics

    CERN Document Server

    Virdi, Surinder; Virdi, Narinder Kaur

    2014-01-01

    Construction Mathematics is an introductory level mathematics text, written specifically for students of construction and related disciplines. Learn by tackling exercises based on real-life construction maths. Examples include: costing calculations, labour costs, cost of materials and setting out of building components. Suitable for beginners and easy to follow throughout. Learn the essential basic theory along with the practical necessities. The second edition of this popular textbook is fully updated to match new curricula, and expanded to include even more learning exercises. End of chapter exercises cover a range of theoretical as well as practical problems commonly found in construction practice, and three detailed assignments based on practical tasks give students the opportunity to apply all the knowledge they have gained. Construction Mathematics addresses all the mathematical requirements of Level 2 construction NVQs from City & Guilds/CITB and Edexcel courses, including the BTEC First Diploma in...

  15. A Conceptual Cost Benefit Analysis of Tailings Matrices Use in Construction Applications

    OpenAIRE

    Mahmood Ali A.; Elektorowicz Maria

    2016-01-01

    As part of a comprehensive research program, new tailings matrices are formulated of combinations of tailings and binder materials. The research program encompasses experimental and numerical analysis of the tailings matrices to investigate the feasibility of using them as construction materials in cold climates. This paper discusses a conceptual cost benefit analysis for the use of these new materials. It is shown here that the financial benefits of using the proposed new tailings matrices i...

  16. Construction and Characterization of a Compact, Portable, Low-Cost Colorimeter for the Chemistry Lab

    Science.gov (United States)

    Clippard, Carrie M.; Hughes, William; Chohan, Balwant S.; Sykes, Danny G.

    2016-01-01

    A low-cost and portable colorimeter was constructed featuring a low-voltage programmable color light sensor-to-frequency converter, a CMOS 8-bit microcontroller, and an LCD display. The instrument has successfully facilitated the introduction and application of spectroscopy to groups of middle school, high school, and undergraduate students. A…

  17. Ecologically Safe Geothermal Energy Resources in Western Siberia near high-rise construction zones

    Science.gov (United States)

    Shevchenko, Alexandr; Shiganova, Olga

    2018-03-01

    The development of geothermal energy in combination with other renewable energy sources (the sun, the wind) will help to solve the problem of heat supply and electrification in near high-rise construction zones of the country, especially in sparsely populated parts, where centralized energy and heat supply is economically unacceptable, and will improve the ecological situation. The aim of the research is to analyze the geothermal resources of the main aquifers in Western Siberia and to develop recommendations for further study and use of heat and power resources of this territory. The article gives retrospective of state research programs and potential use of hydrothermal resources of administrative units geographically entering the territory under consideration. It is noted that by now such programs have been curtailed for various reasons, although there are examples of their successful and effective use in various fields of industry and agriculture. According to the decision of the Supreme Ecological Council of the State Duma Committee of the Russian Federation adopted in 2014 on the beginning of the development of federal targeted programs for the use of heat power water as a source of electricity and heat supply, the Ministry of Natural Resources and Ecology of the Russian Federation made proposals for further research and use of hydrothermal waters in Western Siberia. Implementation of the programs proposed by the authors, alongside with other positive aspects, will solve the problems of heat supply in remote territories and improve the environmental situation in the region.

  18. U.S. Trade Deficit and the Impact of Rising Oil Prices

    National Research Council Canada - National Science Library

    Jackson, James K

    2008-01-01

    .... The fall in the cost of energy imports combined with the drop in import volumes as a result of the slowdown in economic activity has reversed the trend of rising energy imports costs and will sharply...

  19. Construction Guide to Next-Generation High-Performance Walls in Climate Zones 3-5 - Part 2: 2x4 Walls

    Energy Technology Data Exchange (ETDEWEB)

    Kochkin, V. [Home Innovation Research Labs, Upper Marlboro, MD (United States); Wiehagen, J. [Home Innovation Research Labs, Upper Marlboro, MD (United States)

    2017-06-01

    Part 2 of this Construction Guide to High-Performance Walls in Climate Zones 3-5 provides straightforward and cost-effective strategies to construct durable, energy-efficient walls. It addresses walls constructed with 2x4 wood frame studs, wood structural panel (WSP) sheathing as wall bracing and added backing for foam sheathing, a layer of rigid foam sheathing insulation up to 1.5 inches thick over the WSP, and a cladding system installed over the foam sheathing in low-rise residential buildings up to three stories high. Walls with 2x6 framing are addressed in Part 1 of the Guide.

  20. Construction Guide to Next-Generation High-Performance Walls in Climate Zones 3-5 - Part 2: 2x4 Walls

    Energy Technology Data Exchange (ETDEWEB)

    Kochkin, V. [Home Innovation Research Labs, Upper Marlboro, MD (United States); Wiehagen, J. [Home Innovation Research Labs, Upper Marlboro, MD (United States)

    2017-08-31

    Part 2 of this Construction Guide to High-Performance Walls in Climate Zones 3-5 provides straightforward and cost-effective strategies to construct durable, energy-efficient walls. It addresses walls constructed with 2x4 wood frame studs, wood structural panel (WSP) sheathing as wall bracing and added backing for foam sheathing, a layer of rigid foam sheathing insulation up to 1.5 inches thick over the WSP, and a cladding system installed over the foam sheathing in low-rise residential buildings up to three stories high. Walls with 2x6 framing are addressed in Part 1 of the Guide.

  1. State trends in premiums and deductibles, 2003-2009: how building on the Affordable Care Act will help stem the tide of rising costs and eroding benefits.

    Science.gov (United States)

    Schoen, Cathy; Stremikis, Kristof; How, Sabrina K H; Collins, Sara R

    2010-12-01

    Rapidly rising health insurance costs have strained U.S. families and employers in recent years. This issue brief examines data for all states on changes in private employer premiums and deductibles for 2003 and 2009. The analysis finds that premiums for businesses and their employees increased 41 percent across states from 2003 to 2009, while per-person deductibles jumped 77 percent in large as well as small firms. If these trends continue at the rate prior to enactment of the Affordable Care Act, the average premium for family coverage will rise 79 percent by 2020, to more than $23,000. The authors describe how health reform offers the potential to reduce insurance cost growth while improving value and protection. If reforms succeed in slowing premium growth by 1 percentage point annually in all states, by 2020 employers and families together will save $2,323 annually for family coverage, compared with projected trends.

  2. Development of damage functions for high-rise building components

    International Nuclear Information System (INIS)

    Kustu, O.; Miller, D.D.; Brokken, S.T.

    1982-10-01

    The component approach for predicting the effects that ground motion from underground nuclear explosions will have on structures involves predicting the damage to each structural and nonstructural component of a building on the basis of the expected local deformation that most affects the damage to the component. This study was conducted to provide the basic data necessary to evaluate the component approach. Available published laboratory test data for various high-rise building components were collected. These data were analyzed statistically to determine damage threshold values and their variabilities, which in turn were used to derive component damage functions. The portion of construction costs attributable to various building components was determined statistically. This information was needed because component damage functions define damage as a percentage of the replacement values of the component, and, in order to calculate the overall building damage factor, the relative cost of each component must be estimated. The feasibility of the component approach to damage prediction is demonstrated. It is recommended that further experimental research directed towards developing an adequate data base of component damage thresholds for all significant building components should be encouraged. Parallel to this effort, detailed damage data from specific buildings damaged in earthquakes should be collected to verify the theoretical procedure

  3. Opinion Leaders See Rising College Costs as Major Concern.

    Science.gov (United States)

    Chronicle of Higher Education, 1988

    1988-01-01

    A recent survey of federal government officials, corporate leaders in charge of personnel and research, and journalists found dramatically different views in some areas, but agreement in concern about college costs, financing, and lack of government spending for research. Most felt college is a fair value for the cost. (MSE)

  4. Cost-Effectiveness Analysis of Surface Flow Constructed Wetlands (SFCW) for Nutrient Reduction in Drainage Discharge from Agricultural Fields in Denmark.

    Science.gov (United States)

    Gachango, F G; Pedersen, S M; Kjaergaard, C

    2015-12-01

    Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW could be a better optimal nutrients reduction measure in drainage catchments characterized with higher nutrient loads.

  5. AP1000 construction and operating costs

    International Nuclear Information System (INIS)

    Winters, J.W.; Corletti, M.M.; Thompson, M.

    2001-01-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  6. AP1000 construction and operating costs

    Energy Technology Data Exchange (ETDEWEB)

    Winters, J.W.; Corletti, M.M. [Westinghouse Electric Corp., Pittsburgh, PA (United States); Thompson, M

    2001-07-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  7. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    Science.gov (United States)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average

  8. Use of virtual environments to reduce the construction costs of the next generation nuclear power reactors

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.

    2007-01-01

    The near term deployment of the next generation of reactors will only be successful if they are built on time and without the costly overruns experienced in the previous generation. One critical factor in achieving these goals is to ensure the design is optimized for constructability. In this work the authors explored the effectiveness of full-scale virtual reality simulation in the optimization of the design and construction of the next generation of nuclear reactors. The research tested the suitability of immersive virtual reality display technology in aiding engineers in evaluating potential cost reductions that can be realized by the optimization of design and installation and construction sequences. The intent of this research is to see if this type of technology can be used in capacities similar to those currently filled by full-scale physical mockups and desktop simulations. Using a fully-immersive five sided virtual reality system, known as a CAVE, the authors constructed a series of virtual mockups that represented two next generation nuclear power plants, the Westinghouse AP-1000 and the Pebble Bed Modular Reactor (PBMR). These virtual mockups were then tested as a design tool to help locate and correct problem areas, to optimize the construction sequence, and to assist with familiarizing trades people with the performance of maintenance activities. A series of experiments were performed to assess the usefulness of these virtual mockups in accomplishing these tasks. (authors)

  9. Organizational-economic model of formation of socio-commercial multifunctional complex in the construction of high-rise buildings

    Science.gov (United States)

    Kirillova, Ariadna; Prytkova, Oksana O.

    2018-03-01

    The article is devoted to the features of the formation of the organizational and economic model of the construction of a socio-commercial multifunctional complex for high-rise construction. Authors have given examples of high-altitude multifunctional complexes in Moscow, analyzed the advantages and disadvantages in the implementation of multifunctional complexes, stressed the need for a holistic strategic approach, allowing to take into account the prospects for the development of the city and the creation of a comfortable living environment. Based on the analysis of multifunctional complexes features, a matrix of SWOT analysis was compiled. For the development of cities and improving the quality of life of the population, it is proposed to implement a new type of multifunctional complexes of a joint social and commercial direction, including, along with the implementation of office areas - schools, polyclinics, various sports facilities and cultural and leisure centers (theatrical, dance, studio, etc.). The approach proposed in the article for developing the model is based on a comparative evaluation of the multifunctional complex project of a social and commercial direction implemented at the expense of public-private partnership in the form of a concession agreement and a commercial multifunctional complex being built at the expense of the investor. It has been proved by calculations that the obtained indicators satisfy the conditions of expediency of the proposed organizational-economic model and the project of the social and commercial multifunctional complex is effective.

  10. Organizational-economic model of formation of socio-commercial multifunctional complex in the construction of high-rise buildings

    Directory of Open Access Journals (Sweden)

    Kirillova Ariadna

    2018-01-01

    Full Text Available The article is devoted to the features of the formation of the organizational and economic model of the construction of a socio-commercial multifunctional complex for high-rise construction. Authors have given examples of high-altitude multifunctional complexes in Moscow, analyzed the advantages and disadvantages in the implementation of multifunctional complexes, stressed the need for a holistic strategic approach, allowing to take into account the prospects for the development of the city and the creation of a comfortable living environment. Based on the analysis of multifunctional complexes features, a matrix of SWOT analysis was compiled. For the development of cities and improving the quality of life of the population, it is proposed to implement a new type of multifunctional complexes of a joint social and commercial direction, including, along with the implementation of office areas - schools, polyclinics, various sports facilities and cultural and leisure centers (theatrical, dance, studio, etc.. The approach proposed in the article for developing the model is based on a comparative evaluation of the multifunctional complex project of a social and commercial direction implemented at the expense of public-private partnership in the form of a concession agreement and a commercial multifunctional complex being built at the expense of the investor. It has been proved by calculations that the obtained indicators satisfy the conditions of expediency of the proposed organizational-economic model and the project of the social and commercial multifunctional complex is effective.

  11. The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

    Science.gov (United States)

    Zhadanovsky, Boris; Sinenko, Sergey

    2018-03-01

    Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.

  12. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    International Nuclear Information System (INIS)

    Timothy Shaw; Vaugh Whisker

    2004-01-01

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project

  13. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Vaugh Whisker

    2004-02-28

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project.

  14. Virtual Prototyping for Construction Site Co2 Emissions and Hazard Detection

    Directory of Open Access Journals (Sweden)

    Johnny Kwok Wai Wong

    2014-08-01

    Full Text Available The need for an efficient means of managing emissions and identifying potential hazard black spots in construction processes effectively and at the lowest cost possible has been highlighted in the construction sector. This study illustrates an integrated 5D model developed for quantifying carbon emissions and simulating the pattern of emissions of construction processes as a whole using virtual prototyping technologies. The predicted construction emissions data for each activity is generated and plotted to visually demonstrate the emission rates alongside the integrated four-dimensional VP framework of the construction project. The model also consists of a pro-active construction management system (PCMS, which assist the project team to detect sources of danger to on-site workers and provide pro-active warnings to them so as to avoid fatal accidents that are often caused by falling from heights and being struck by moving objects. A Hong Kong high-rise housing development project is used to exhibit the application of the carbon emission visualisation and potential accident detection system. This tool aims to encourage construction industry practitioners to become more environmentally conscious and pro-active in carbon mitigation and safety performance.

  15. Analysis of coastal protection under rising flood risk

    Directory of Open Access Journals (Sweden)

    Megan J. Lickley

    2014-01-01

    Full Text Available Infrastructure located along the U.S. Atlantic and Gulf coasts is exposed to rising risk of flooding from sea level rise, increasing storm surge, and subsidence. In these circumstances coastal management commonly based on 100-year flood maps assuming current climatology is no longer adequate. A dynamic programming cost–benefit analysis is applied to the adaptation decision, illustrated by application to an energy facility in Galveston Bay. Projections of several global climate models provide inputs to estimates of the change in hurricane and storm surge activity as well as the increase in sea level. The projected rise in physical flood risk is combined with estimates of flood damage and protection costs in an analysis of the multi-period nature of adaptation choice. The result is a planning method, using dynamic programming, which is appropriate for investment and abandonment decisions under rising coastal risk.

  16. Analysis of Correlations between the Level of Partnering Relations and their Influence on the Time, Cost, Quality and Safety of Implementation of Construction Projects

    Directory of Open Access Journals (Sweden)

    Radziszewska-Zielina Elżbieta

    2014-11-01

    Full Text Available The present paper uses the developed model of the influence of partnering relations on the time, cost, quality and safety of implementation of construction projects. On its basis, a questionnaire has been created and a preliminary survey has been conducted. The paper presents an analysis of correlations between the level of partnering relations in the context of the partnering measures indicated in the model and their influence on the time, cost, quality and safety of implementation of construction projects. The analysis was conducted based on the data collected in 52 construction projects. The values of the Spearman rank correlation coefficient and the Pearson product-moment correlation coefficient have been calculated for the examined relations. The analysis allowed for indicating the measures of partnering whose improvement most often brings benefits with regard to the time, cost, quality and safety of implementation of construction projects. Among the 80 analysed correlations, the ones identified as strong were: 15 relations connected with the time, 8 with the cost, 5 with the quality and 1 with the safety of implementation of construction projects.

  17. STUDY OF SHELL FOR ENERGY EFFICIENT OF SUSTAINABLE LOW-RISE BUILDING

    Directory of Open Access Journals (Sweden)

    DANISHEVSKYI V. V.

    2016-03-01

    Full Text Available The article presents the results of study the shell for energy-efficient environmental low-rise residential building, corresponding to the criteria of sustainable development in construction. Purpose. The purpose of the presented research is providing a study of parameters for shell of energy-efficient environmental low-rise buildings. Methodology. Research is carried out on the basis of an improved method for calculating the thermal characteristics of the external walling, as well as physical heat transfer simulation. Conclusion.The ratio between the thickness of external walling and the proportion of heat loss through them was determined, and also the heat loss through thermal "bridges" was studied. Originality. The limits for the optimum thickness of the external walling of ecological materials was analyzed, and it was offered solution for minimization of heat loss through the nodes of shell. Practical value.Recommendations are worked out on constructing of thermal shell at planning of energy-efficient low-rise residential buildings.

  18. The Impact of Rising Temperatures on Aircraft Takeoff Performance

    Science.gov (United States)

    Coffel, E.; Horton, R. M.; Thompson, T. R.

    2017-12-01

    Steadily rising mean and extreme temperatures as a result of climate change will likely impact the air transportation system over the coming decades. As air temperatures rise at constant pressure, air density declines, resulting in less lift generation by an aircraft wing at a given airspeed and potentially imposing a weight restriction on departing aircraft. This study presents a general model to project future weight restrictions across a fleet of aircraft with different takeoff weights operating at a variety of airports. We construct performance models for five common commercial aircraft and 19 major airports around the world and use projections of daily temperatures from the CMIP5 model suite under the RCP 4.5 and RCP 8.5 emissions scenarios to calculate required hourly weight restriction. We find that on average, 10-30% of annual flights departing at the time of daily maximum temperature may require some weight restriction below their maximum takeoff weights, with mean restrictions ranging from 0.5 to 4% of total aircraft payload and fuel capacity by mid- to late century. Both mid-sized and large aircraft are affected, and airports with short runways and high tempera- tures, or those at high elevations, will see the largest impacts. Our results suggest that weight restriction may impose a non-trivial cost on airlines and impact aviation operations around the world and that adaptation may be required in aircraft design, airline schedules, and/or runway lengths.

  19. A Comparative Cradle-to-Gate Life Cycle Assessment of Mid-Rise Office Building Construction Alternatives: Laminated Timber or Reinforced Concrete

    Directory of Open Access Journals (Sweden)

    Raymond J. Cole

    2012-07-01

    Full Text Available The objective of this project was to quantify and compare the environmental impacts associated with alternative designs for a typical North American mid-rise office building. Two scenarios were considered; a traditional cast-in-place, reinforced concrete frame and a laminated timber hybrid design, which utilized engineered wood products (cross-laminated timber (CLT and glulam. The boundary of the quantitative analysis was cradle-to-construction site gate and encompassed the structural support system and the building enclosure. Floor plans, elevations, material quantities, and structural loads associated with a five-storey concrete-framed building design were obtained from issued-for-construction drawings. A functionally equivalent, laminated timber hybrid design was conceived, based on Canadian Building Code requirements. Design values for locally produced CLT panels were established from in-house material testing. Primary data collected from a pilot-scale manufacturing facility was used to develop the life cycle inventory for CLT, whereas secondary sources were referenced for other construction materials. The TRACI characterization methodology was employed to translate inventory flows into impact indicators. The results indicated that the laminated timber building design offered a lower environmental impact in 10 of 11 assessment categories. The cradle-to-gate process energy was found to be nearly identical in both design scenarios (3.5 GJ/m2, whereas the cumulative embodied energy (feedstock plus process of construction materials was estimated to be 8.2 and 4.6 GJ/m2 for the timber and concrete designs, respectively; which indicated an increased availability of readily accessible potential energy stored within the building materials of the timber alternative.

  20. The rise and fall of refineries

    International Nuclear Information System (INIS)

    Chretien, D.

    2002-01-01

    This paper described the rise and fall of refineries in Montreal. Well before Calgary, Montreal was the hub of activity for oil refineries because Montreal was the principle consuming market for petroleum products in Canada. The location was good, particularly since the soil was clay which helped prevent soil infiltration of petroleum. The first refinery in Montreal was constructed in 1916 by Esso, followed by Texaco in 1921 and Gulf in 1931. Initially oil was shipped by boat to the Port of Montreal from Saudi Arabia. Later, the petroleum came mostly from Venezuela. At the beginning of the 1980s many refineries were closed because they became obsolete and upgrading them would have been too costly. Only 3 refineries remain in Quebec, of which 2 are in Montreal. They are owned by Shell and PetroCanada. The third refinery in Quebec is in St-Romuald and is owned by UltraMar. One of the major contributing factors to the decline of the refining industry in Montreal was the decision in 1984 by former Prime Minister Trudeau to force Canadian provinces to purchase their petroleum from Alberta. This caused the petrochemical industry to locate in Sarnia in Ontario, leaving the Montreal refining centre to become obsolete. 3 figs

  1. (Value Stream Costing As A New Costing System)

    OpenAIRE

    Karcıoğlu, Reşar; Nuray, Meral

    2010-01-01

    In recent years, the number of lean company which use lean manufacturing system is rising. This companies use the standard costing while appropriate for traditional bathch manufacturing. But standard costing system fails to support the goals of lean manufacturing system. A different method of costing based upon the characteristics of the value stream is needed to fulfill the needs of the lean company. This systemis Value Stream Costing. When a lean company moves to value stream management, th...

  2. Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects

    Directory of Open Access Journals (Sweden)

    D. Mirzai Matin

    2016-08-01

    Full Text Available Water construction projects in Iran frequently face problems which cause cost overrun and time delay, the two most common issues in construction projects in general. The objective of this survey is to identify and quantify these problems and thus help in avoiding them. This survey represents a collection of the most significant problems found in the literature, classified into 11 groups according to their source. The questionnaire form used contains 84 questions which were answered by random engineers who work in water construction projects. The Relative Importance Weight (RIW method is used to weight the importance of each one of the 84 problems. The focus of this survey is on overall top ten issues which are: bureaucracy in bidding method, inflation, economical condition of the government, not enough information gathered and surveys done before design, monthly payment difficulties, material cost changes, law changes by the government, financial difficulties, mode of financing and payment for completed work and changes made by the owner. A section for each of these issues provides additional information about them. In the full text of this survey the same weighting method is used to classify the main groups, and the results show that issues related to the groups of government, owner and consultant has the most significant impact. The last part of this survey describes the point of view of the engineers who took part in this survey and the recommendations they made.

  3. Cost considerations

    NARCIS (Netherlands)

    Michiel Ras; Debbie Verbeek-Oudijk; Evelien Eggink

    2013-01-01

    Original title: Lasten onder de loep The Dutch government spends almost 7 billion euros  each year on care for people with intellectual disabilities, and these costs are rising steadily. This report analyses what underlies the increase in costs that occurred between 2007 and 2011. Was

  4. Factors affecting construction performance: exploratory factor analysis

    Science.gov (United States)

    Soewin, E.; Chinda, T.

    2018-04-01

    The present work attempts to develop a multidimensional performance evaluation framework for a construction company by considering all relevant measures of performance. Based on the previous studies, this study hypothesizes nine key factors, with a total of 57 associated items. The hypothesized factors, with their associated items, are then used to develop questionnaire survey to gather data. The exploratory factor analysis (EFA) was applied to the collected data which gave rise 10 factors with 57 items affecting construction performance. The findings further reveal that the items constituting ten key performance factors (KPIs) namely; 1) Time, 2) Cost, 3) Quality, 4) Safety & Health, 5) Internal Stakeholder, 6) External Stakeholder, 7) Client Satisfaction, 8) Financial Performance, 9) Environment, and 10) Information, Technology & Innovation. The analysis helps to develop multi-dimensional performance evaluation framework for an effective measurement of the construction performance. The 10 key performance factors can be broadly categorized into economic aspect, social aspect, environmental aspect, and technology aspects. It is important to understand a multi-dimension performance evaluation framework by including all key factors affecting the construction performance of a company, so that the management level can effectively plan to implement an effective performance development plan to match with the mission and vision of the company.

  5. Prevalence and cost of imaging in inpatient falls: the rising cost of falling

    Directory of Open Access Journals (Sweden)

    Fields J

    2015-06-01

    Full Text Available Jessica Fields,1 Tahani Alturkistani,2 Neal Kumar,3 Arjun Kanuri,3 Deeb N Salem,1 Samson Munn,2 Deborah Blazey-Martin1 1Department of Medicine, Tufts Medical Center, Boston, MA, USA; 2Department of Radiology, Tufts Medical Center, Boston, MA, USA; 3Tufts University School of Medicine, Boston, MA, USA Objective: To quantify the type, prevalence, and cost of imaging following inpatient falls, identify factors associated with post-fall imaging, and determine correlates of positive versus negative imaging. Design: Single-center retrospective cohort study of inpatient falls. Data were collected from the hospital's adverse event reporting system, DrQuality. Age, sex, date, time, and location of fall, clinical service, Morse Fall Scale/fall protocol, admitting diagnosis, and fall-related imaging studies were reviewed. Cost included professional and facilities fees for each study. Setting: Four hundred and fifteen bed urban academic hospital over 3 years (2008–2010. Patients: All adult inpatient falls during the study period were included. Falls experienced by patients aged <18 years, outpatient and emergency patients, visitors to the hospital, and staff were excluded. Measurements and main results: Five hundred and thirty inpatient falls occurred during the study period, average patient age 60.7 years (range 20–98. More than half of falls were men (55% and patients considered at risk of falls (56%. Falls were evenly distributed across morning (33%, evening (34%, and night (33% shifts. Of 530 falls, 178 (34% patients were imaged with 262 studies. Twenty percent of patients imaged had at least one positive imaging study attributed to the fall and 82% of studies were negative. Total cost of imaging was $160,897, 63% ($100,700 from head computed tomography (CT. Conclusion: Inpatient falls affect patients of both sexes, all ages, occur at any time of day and lead to expensive imaging, mainly from head CTs. Further study should be targeted toward

  6. A Conceptual Cost Benefit Analysis of Tailings Matrices Use in Construction Applications

    Directory of Open Access Journals (Sweden)

    Mahmood Ali A.

    2016-01-01

    Full Text Available As part of a comprehensive research program, new tailings matrices are formulated of combinations of tailings and binder materials. The research program encompasses experimental and numerical analysis of the tailings matrices to investigate the feasibility of using them as construction materials in cold climates. This paper discusses a conceptual cost benefit analysis for the use of these new materials. It is shown here that the financial benefits of using the proposed new tailings matrices in terms of environmental sustainability are much higher when compared to normal sand matrices.

  7. The 1988 coal outlook: steadily rising consumption

    Energy Technology Data Exchange (ETDEWEB)

    Soras, C.G.; Stodden, J.R.

    1987-12-01

    Total coal use - domestic and foreign - will reach 910 million tons in 1988, an expansion of 1.3% from an estimated 898 million tons in 1987. The overall rise in consumption will add to inventory needs. Moreover, lower interest rates cut effective carrying costs and further encourage the holding of coal stocks by users. The results will be a gain in inventories of 3.5 tons by the end of 1988. As a result of all these factors, coal production is anticipated to rise by 11.6 million tons, or 1.2%, which projects firm markets in a time of relatively soft economic conditions in the USA. 2 tabs.

  8. Well construction team approach creates a new future for one company's operations on the Dutch Continental Shelf

    International Nuclear Information System (INIS)

    Stringer, R.B.; Bakker, T.W.; Mejnertsen, T.

    1994-01-01

    Rising costs and low energy prices were inhibiting the development of marginal fields on the Dutch Continental Shelf, resulting in a major reduction in drilling activity. This triggered a change from traditional operating and contracting strategies to a Well Construction Team approach based on partnering agreements with the principal drilling and service contractors. The change has resulted in major cost reductions coupled to improved well quality that are justifying the re-evaluation of previously sub-economic development prospects. This paper describes the strategies employed and presents the results achieved during the first year of the partnership

  9. COUNTERBALANCING BENEFITS AND DRAWBACKS OF CONTEMPORARY STABLISED EARTH CONSTRUCTION BY CONSTRUCTION PROFESSIONALS

    Directory of Open Access Journals (Sweden)

    Mohammad Sharif Zami

    2011-07-01

    Full Text Available It is debatable among the construction professionals whether contemporary stabilised earth construction is beneficial in urban low cost housing. Existing literature recorded a lot of benefits and drawbacks from construction professionals, which is empirically substantiated. But there are drawbacks found in the literature that seemingly are conflicting, and construction professionals are divided in their opinion. This paper seeks to address these conflicts and division by validating the controversial drawbacks of contemporary stabilised earth construction in urban low cost housing.

  10. Architecture of high-rise buildings as a brand of the modern Kazakhstan

    Science.gov (United States)

    Abdrassilova, Gulnara; Kozbagarova, Nina; Tuyakayeva, Ainagul

    2018-03-01

    Using practical examples article reviews urban-planning and space-planning features of design and construction of high-rise buildings in Kazakhstan conditions; methods are identified that provide for structural stability against wind and seismic loads based on innovative technical and technological solutions. Article authors stress out the fashion function of high-rise buildings in the new capital of Kazakhstan, the Astana city.

  11. On the design of high-rise buildings with a specified level of reliability

    Science.gov (United States)

    Dolganov, Andrey; Kagan, Pavel

    2018-03-01

    High-rise buildings have a specificity, which significantly distinguishes them from traditional buildings of high-rise and multi-storey buildings. Steel structures in high-rise buildings are advisable to be used in earthquake-proof regions, since steel, due to its plasticity, provides damping of the kinetic energy of seismic impacts. These aspects should be taken into account when choosing a structural scheme of a high-rise building and designing load-bearing structures. Currently, modern regulatory documents do not quantify the reliability of structures. Although the problem of assigning an optimal level of reliability has existed for a long time. The article shows the possibility of designing metal structures of high-rise buildings with specified reliability. Currently, modern regulatory documents do not quantify the reliability of high-rise buildings. Although the problem of assigning an optimal level of reliability has existed for a long time. It is proposed to establish the value of reliability 0.99865 (3σ) for constructions of buildings and structures of a normal level of responsibility in calculations for the first group of limiting states. For increased (construction of high-rise buildings) and reduced levels of responsibility for the provision of load-bearing capacity, it is proposed to assign respectively 0.99997 (4σ) and 0.97725 (2σ). The coefficients of the use of the cross section of a metal beam for different levels of security are given.

  12. The Culture of Construction Organisations: the Epitome of Institutionalised Corruption

    Directory of Open Access Journals (Sweden)

    Andrew Oyen Arewa

    2015-08-01

    Full Text Available The culture of an organisation is a vital element of business competency that must align with its strategic goals, and enhance peoples’ perceptions, feelings and behaviour in adapting to the world around them. Organisational culture may also bring about negative practices such as dishonesty and unethical behaviours. Recently the culture of some construction organisations has been called into question. For example, major construction projects around the globe have become involved in allegations of fraud and corruption. The cost is currently estimated at US$860 billion globally; with forecasts that it may rise to US$1.5 trillion by 2025. Hitherto the role of the culture of construction organisations in fraud and corruption activities has been largely hidden. The study aim is to establish whether the culture of construction organisations promotes corrupt practices in the UK construction and infrastructure sector. The study employed mixed research methods with interviews supported by a questionnaire and an examination of five case studies in different countries. Findings show that the culture of construction organisations together with the nature of the industry promotes fraud and corruption. The study subsequently highlights key cultural factors that support fraud and corruption in a way that is almost institutionalised.

  13. Wood and Other Materials Used to Construct Nonresidential Buildings - Canada

    Science.gov (United States)

    David B. McKeever; Joe Elling

    2014-01-01

    Low-rise nonresidential building construction is an important market in Canada for lumber, engineered wood products, structural wood panels, and nonstructural wood panels. This report examines wood products consumption in 2012 for construction of selected low-rise nonresidential buildings types that have six or fewer stories. Buildings with more than six stories are...

  14. Relationship between degree of risk, cost and level of compliance to occupational health and safety regulations in construction

    Directory of Open Access Journals (Sweden)

    Abimbola Olukemi Windapo

    2013-06-01

    Full Text Available This paper investigates the role of statutory health and safety (H&S regulations in managing construction project risks. The study examines whether the decision made by contractors to comply with the regulations, the cost of compliance and savings of H&S regulatory requirements is influenced by the degree or level of risk, which the regulations are trying to prevent. The rationale for the examination stems from previous studies which establish that building designers and contractors perceive the cost of complying with regulations as additional burdens, which they have to conform to, and which are in some cases unnecessary, and also the fact that construction related injuries and fatalities are on the increase. Qualitative and quantitative data obtained from a descriptive survey and H&S site audit by the Master Builder Association of the Western Cape (MBAWC were used as the measurements of risk, level of compliance to regulations, cost of compliance and savings. By correlating the quantitative and qualitative data, there is empirical evidence to support a negative relationship between the degree of risk, level and cost of compliance and cost savings. Based on the study’s findings, this paper concludes that the decision made by contractors to comply with H&S regulatory requirements is influenced by the perceived cost saving on account of compliance and that cost savings are influenced by the probability of accident occurrence which is an element of the degree of risk which the regulation is trying to prevent or control. 

  15. Relationship between degree of risk, cost and level of compliance to occupational health and safety regulations in construction

    Directory of Open Access Journals (Sweden)

    Abimbola Olukemi Windapo

    2013-06-01

    Full Text Available This paper investigates the role of statutory health and safety (H&S regulations in managing construction project risks. The study examines whether the decision made by contractors to comply with the regulations, the cost of compliance and savings of H&S regulatory requirements is influenced by the degree or level of risk, which the regulations are trying to prevent. The rationale for the examination stems from previous studies which establish that building designers and contractors perceive the cost of complying with regulations as additional burdens, which they have to conform to, and which are in some cases unnecessary, and also the fact that construction related injuries and fatalities are on the increase. Qualitative and quantitative data obtained from a descriptive survey and H&S site audit by the Master Builder Association of the Western Cape (MBAWC were used as the measurements of risk, level of compliance to regulations, cost of compliance and savings. By correlating the quantitative and qualitative data, there is empirical evidence to support a negative relationship between the degree of risk, level and cost of compliance and cost savings. Based on the study’s findings, this paper concludes that the decision made by contractors to comply with H&S regulatory requirements is influenced by the perceived cost saving on account of compliance and that cost savings are influenced by the probability of accident occurrence which is an element of the degree of risk which the regulation is trying to prevent or control.

  16. Construction and Operation Costs of Wastewater Treatment and Implications for the Paper Industry in China.

    Science.gov (United States)

    Niu, Kunyu; Wu, Jian; Yu, Fang; Guo, Jingli

    2016-11-15

    This paper aims to develop a construction and operation cost model of wastewater treatment for the paper industry in China and explores the main factors that determine these costs. Previous models mainly involved factors relating to the treatment scale and efficiency of treatment facilities for deriving the cost function. We considered the factors more comprehensively by adding a regional variable to represent the economic development level, a corporate ownership factor to represent the plant characteristics, a subsector variable to capture pollutant characteristics, and a detailed-classification technology variable. We applied a unique data set from a national pollution source census for the model simulation. The major findings include the following: (1) Wastewater treatment costs in the paper industry are determined by scale, technology, degree of treatment, ownership, and regional factors; (2) Wastewater treatment costs show a large decreasing scale effect; (3) The current level of pollutant discharge fees is far lower than the marginal treatment costs for meeting the wastewater discharge standard. Key implications are as follows: (1) Cost characteristics and impact factors should be fully recognized when planning or making policies relating to wastewater treatment projects or technology development; (2) There is potential to reduce treatment costs by centralizing wastewater treatment via industrial parks; (3) Wastewater discharge fee rates should be increased; (4) Energy efficient technology should become the future focus of wastewater treatment.

  17. Dynamical Capillary Rise Photonic Sensor for Testing of Diesel and Biodiesel Fuel

    Directory of Open Access Journals (Sweden)

    Michal BORECKI

    2015-10-01

    Full Text Available There are many fuel quality standards introduced by national organizations and fuel producers. Usual techniques for measuring fuel parameters like cetane number, cetane index, fraction composition, viscosity, density, and flash point, require relatively complex and expensive laboratory equipment. On the fuel user side, fast and low cost sensing of useful state of biodiesel fuel is important. The main parameters of diesel fuel compatibility are: density, viscosity and surface tension. These three parameters define indirectly the quality of the fuel atomization process and the injected portion of energy that affect the quality of the fuel. In the presented paper the purposefulness of fuel testing using measurements of separable parameters is discussed. On this base, a sensor which enables the examination of relation of the mentioned parameters in one arrangement is proposed, analyzed and tested. The sensor uses the dynamic capillary rise method with photonic multichannel data reading in an inclined capillary. The principle of the sensor’s operation, the construction of the sensor head, and the experimental results are presented. The capillary is a disposable element. The sensor testing was performed with freshly prepared biodiesel fuels, and fuels stored for 2 years. We conclude that the proposed construction may be in future the base of low cost commercially marketable instruments for basic fuel classification: fit for use or not. That classification includes initial fuel composition and fuel parameters change during storage. Therefore, the proposed sensor is intended to use in fuel buying/selling point rather than used as part of a diesel engine automated system.

  18. Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM

    Directory of Open Access Journals (Sweden)

    Igor Peško

    2017-01-01

    Full Text Available Offer preparation has always been a specific part of a building process which has significant impact on company business. Due to the fact that income greatly depends on offer’s precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a precise offer within required time and available resources which are always insufficient. The paper presents a research of precision that can be achieved while using artificial intelligence for estimation of cost and duration in construction projects. Both artificial neural networks (ANNs and support vector machines (SVM are analysed and compared. The best SVM has shown higher precision, when estimating costs, with mean absolute percentage error (MAPE of 7.06% compared to the most precise ANNs which has achieved precision of 25.38%. Estimation of works duration has proved to be more difficult. The best MAPEs were 22.77% and 26.26% for SVM and ANN, respectively.

  19. Iliac crest autograft versus alternative constructs for anterior cervical spine surgery: Pros, cons, and costs

    Science.gov (United States)

    Epstein, Nancy E.

    2012-01-01

    Background: Grafting choices available for performing anterior cervical diskectomy/fusion (ACDF) procedures have become a major concern for spinal surgeons, and their institutions. The “gold standard”, iliac crest autograft, may still be the best and least expensive grafting option; it deserves to be reassessed along with the pros, cons, and costs for alternative grafts/spacers. Methods: Although single or multilevel ACDF have utilized iliac crest autograft for decades, the implant industry now offers multiple alternative grafting and spacer devices; (allografts, cages, polyether-etherketone (PEEK) amongst others). While most studies have focused on fusion rates and clinical outcomes following ACDF, few have analyzed the “value-added” of these various constructs (e.g. safety/efficacy, risks/complications, costs). Results: The majority of studies document 95%-100% fusion rates when iliac crest autograft is utilized to perform single level ACDF (X-ray or CT confirmed at 6-12 postoperative months). Although many allograft studies similarly quote 90%-100% fusion rates (X-ray alone confirmed at 6-12 postoperative months), a recent “post hoc analysis of data from a prospective multicenter trial” (Riew KD et. al., CSRS Abstract Dec. 2011; unpublished) revealed a much higher delayed fusion rate using allografts at one year 55.7%, 2 years 87%, and four years 92%. Conclusion: Iliac crest autograft utilized for single or multilevel ACDF is associated with the highest fusion, lowest complication rates, and significantly lower costs compared with allograft, cages, PEEK, or other grafts. As spinal surgeons and institutions become more cost conscious, we will have to account for the “value added” of these increasingly expensive graft constructs. PMID:22905321

  20. A model of water and sediment balance as determinants of relative sea level rise in contemporary and future deltas

    Science.gov (United States)

    Tessler, Zachary D.; Vörösmarty, Charles J.; Overeem, Irina; Syvitski, James P. M.

    2018-03-01

    Modern deltas are dependent on human-mediated freshwater and sediment fluxes. Changes to these fluxes impact delta biogeophysical functioning and affect the long-term sustainability of these landscapes for human and for natural systems. Here we present contemporary estimates of long-term mean sediment balance and relative sea level rise across 46 global deltas. We model scenarios of contemporary and future water resource management schemes and hydropower infrastructure in upstream river basins to explore how changing sediment fluxes impact relative sea level rise in delta systems. Model results show that contemporary sediment fluxes, anthropogenic drivers of land subsidence, and sea level rise result in delta relative sea level rise rates that average 6.8 mm/y. Assessment of impacts of planned and under-construction dams on relative sea level rise rates suggests increases on the order of 1 mm/y in deltas with new upstream construction. Sediment fluxes are estimated to decrease by up to 60% in the Danube and 21% in the Ganges-Brahmaputra-Meghna if all currently planned dams are constructed. Reduced sediment retention on deltas caused by increased river channelization and management has a larger impact, increasing relative sea level rise on average by nearly 2 mm/y. Long-term delta sustainability requires a more complete understanding of how geophysical and anthropogenic change impact delta geomorphology. Local and regional strategies for sustainable delta management that focus on local and regional drivers of change, especially groundwater and hydrocarbon extraction and upstream dam construction, can be highly impactful even in the context of global climate-induced sea level rise.

  1. Costly location in Hotelling duopoly

    NARCIS (Netherlands)

    Hinloopen, J.; Martin, S.

    We introduce a cost of location into Hotelling's (1929) spatial duopoly model. We derive the general conditions on the cost-of-location function under which a pure strategy price-location Nash equilibrium exists. With linear transportation cost and a suitably specified cost of location that rises

  2. Costly location in Hotelling duopoly

    NARCIS (Netherlands)

    Hinloopen, J.; Martin, S.

    2013-01-01

    We introduce a cost of location into Hotelling’s (1929) spatial duopoly. We derive the general conditions on the cost-of-location function under which a pure strategy price-location Nash equilibrium exists. With linear transportation cost and a suitably specified cost of location that rises toward

  3. The Use Potential of Traditional Building Materials for the Realization of Structures by Modern Methods of Construction

    Science.gov (United States)

    Spišáková, Marcela; Mačková, Daniela

    2015-11-01

    The sustainable building has taken off in recent years with many investors looking for new and different methods of construction. The traditional building materials can be made out of natural materials, while others can help to lower energy costs of the occupant once built. Regardless of what the goal of the investor is, traditional building materials and their use is on the rise. The submitted paper provides an overview of natural building materials and possible modern building systems using these construction materials. Based on the questionnaire survey is defined the use potential of traditional building materials for the realization of the construction by methods of modern constructions and then are determined the drivers and barriers of traditional materials through using modern methods of construction. Considering the analysis of the achieved results, we can identify the gaps in the construction market in Slovakia and also to assess the perception of potential investors in the field of traditional building materials use, which is the purpose of submitted paper.

  4. Minimization of Construction Costs for an All Battery-Swapping Electric-Bus Transportation System: Comparison with an All Plug-In System

    Directory of Open Access Journals (Sweden)

    Shyang-Chyuan Fang

    2017-06-01

    Full Text Available The greenhouse gases and air pollution generated by extensive energy use have exacerbated climate change. Electric-bus (e-bus transportation systems help reduce pollution and carbon emissions. This study analyzed the minimization of construction costs for an all battery-swapping public e-bus transportation system. A simulation was conducted according to existing timetables and routes. Daytime charging was incorporated during the hours of operation; the two parameters of the daytime charging scheme were the residual battery capacity and battery-charging energy during various intervals of daytime peak electricity hours. The parameters were optimized using three algorithms: particle swarm optimization (PSO, a genetic algorithm (GA, and a PSO–GA. This study observed the effects of optimization on cost changes (e.g., number of e-buses, on-board battery capacity, number of extra batteries, charging facilities, and energy consumption and compared the plug-in and battery-swapping e-bus systems. The results revealed that daytime charging can reduce the construction costs of both systems. In contrast to the other two algorithms, the PSO–GA yielded the most favorable optimization results for the charging scheme. Finally, according to the cases investigated and the parameters of this study, the construction cost of the plug-in e-bus system was shown to be lower than that of the battery-swapping e-bus system.

  5. Impaired photosynthesis and increased leaf construction costs may induce floral stress during episodes of global warming over macroevolutionary timescales.

    Science.gov (United States)

    Haworth, Matthew; Belcher, Claire M; Killi, Dilek; Dewhirst, Rebecca A; Materassi, Alessandro; Raschi, Antonio; Centritto, Mauro

    2018-04-18

    Global warming events have coincided with turnover of plant species at intervals in Earth history. As mean global temperatures rise, the number, frequency and duration of heat-waves will increase. Ginkgo biloba was grown under controlled climatic conditions at two different day/night temperature regimes (25/20 °C and 35/30 °C) to investigate the impact of heat stress. Photosynthetic CO 2 -uptake and electron transport were reduced at the higher temperature, while rates of respiration were greater; suggesting that the carbon balance of the leaves was adversely affected. Stomatal conductance and the potential for evaporative cooling of the leaves was reduced at the higher temperature. Furthermore, the capacity of the leaves to dissipate excess energy was also reduced at 35/30 °C, indicating that photo-protective mechanisms were no longer functioning effectively. Leaf economics were adversely affected by heat stress, exhibiting an increase in leaf mass per area and leaf construction costs. This may be consistent with the selective pressures experienced by fossil Ginkgoales during intervals of global warming such as the Triassic - Jurassic boundary or Early Eocene Climatic Optimum. The physiological and morphological responses of the G. biloba leaves were closely interrelated; these relationships may be used to infer the leaf economics and photosynthetic/stress physiology of fossil plants.

  6. Design to Cost and Life Cycle Cost.

    Science.gov (United States)

    1980-07-01

    MANAGEMENT TASK ORIENTATED COST STRUCTURE 5. COSTS OF CONSTRUCTION INIFRA 2. COSTS DURING DEVELOPMENT -6. COSTS OF TRAINING 3. COSTS DURING TESi ...de r~duction des coats, ii faut disponer de ?!vyenr. performants d’eetimation des coats en main-d’oeuvre et en applrvininrinesent. Cam moyenm doivent

  7. Factors influencing decisions on delay claims in construction contracts for Indian scenario

    Directory of Open Access Journals (Sweden)

    Nitin Balkrishna Chaphalkar

    2014-03-01

    Full Text Available Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, which gives rise to claims leading to disputes. These disputes if not handled properly tend to consume time and money of all parties to the contract. To resolve the dispute in optimum time, it is essential to understand the root cause of disputes as early as possible. Hence there is a need of analyzing the disputes scientifically.  The present study reveals from the study of arbitration awards that the causes for delay claims can be grouped in domains and the probable decisions to the disputes can be traced through the probing questions considered by decision makers. This paper attempts to identify questions related to disputes for Indian scenario through literature, arbitration awards, court cases and discussions with professionals.

  8. Factors influencing decisions on delay claims in construction contracts for Indian scenario

    Directory of Open Access Journals (Sweden)

    Nitin Balkrishna Chaphalkar

    2014-03-01

    Full Text Available   Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, which gives rise to claims leading to disputes. These disputes if not handled properly tend to consume time and money of all parties to the contract. To resolve the dispute in optimum time, it is essential to understand the root cause of disputes as early as possible. Hence there is a need of analyzing the disputes scientifically.  The present study reveals from the study of arbitration awards that the causes for delay claims can be grouped in domains and the probable decisions to the disputes can be traced through the probing questions considered by decision makers. This paper attempts to identify questions related to disputes for Indian scenario through literature, arbitration awards, court cases and discussions with professionals.

  9. Near-linear cost increase to reduce climate-change risk

    Energy Technology Data Exchange (ETDEWEB)

    Schaeffer, M. [Environmental Systems Analysis Group, Wageningen University and Research Centre, P.O. Box 47, 6700 AA Wageningen (Netherlands); Kram, T.; Van Vuuren, D.P. [Climate and Global Sustainability Group, Netherlands Environmental Assessment Agency, P.O. Box 303, 3720 AH Bilthoven (Netherlands); Meinshausen, M.; Hare, W.L. [Potsdam Institute for Climate Impact Research, P.O. Box 60 12 03, 14412 Potsdam (Germany); Schneider, S.H. (ed.) [Stanford University, Stanford, CA (United States)

    2008-12-30

    One approach in climate-change policy is to set normative long-term targets first and then infer the implied emissions pathways. An important example of a normative target is to limit the global-mean temperature change to a certain maximum. In general, reported cost estimates for limiting global warming often rise rapidly, even exponentially, as the scale of emission reductions from a reference level increases. This rapid rise may suggest that more ambitious policies may be prohibitively expensive. Here, we propose a probabilistic perspective, focused on the relationship between mitigation costs and the likelihood of achieving a climate target. We investigate the qualitative, functional relationship between the likelihood of achieving a normative target and the costs of climate-change mitigation. In contrast to the example of exponentially rising costs for lowering concentration levels, we show that the mitigation costs rise proportionally to the likelihood of meeting a temperature target, across a range of concentration levels. In economic terms investing in climate mitigation to increase the probability of achieving climate targets yields 'constant returns to scale', because of a counterbalancing rapid rise in the probabilities of meeting a temperature target as concentration is lowered.

  10. Rugged calorimeter with a fast rise time

    International Nuclear Information System (INIS)

    McMurtry, W.M.; Dolce, S.R.

    1980-01-01

    An intrinsic 1-mil-thick gold foil calorimeter has been developed which rises to 95% of the energy deposited in less than 2 microseconds. This calorimeter is very rugged, and can withstand rough handling without damage. The time constant is long, in the millisecond range, because of its unique construction. Use of this calorimeter has produced 100% data recovery, and agreement with true deposition to less than 10%

  11. High-voltage isolation transformer for sub-nanosecond rise time pulses constructed with annular parallel-strip transmission lines.

    Science.gov (United States)

    Homma, Akira

    2011-07-01

    A novel annular parallel-strip transmission line was devised to construct high-voltage high-speed pulse isolation transformers. The transmission lines can easily realize stable high-voltage operation and good impedance matching between primary and secondary circuits. The time constant for the step response of the transformer was calculated by introducing a simple low-frequency equivalent circuit model. Results show that the relation between the time constant and low-cut-off frequency of the transformer conforms to the theory of the general first-order linear time-invariant system. Results also show that the test transformer composed of the new transmission lines can transmit about 600 ps rise time pulses across the dc potential difference of more than 150 kV with insertion loss of -2.5 dB. The measured effective time constant of 12 ns agreed exactly with the theoretically predicted value. For practical applications involving the delivery of synchronized trigger signals to a dc high-voltage electron gun station, the transformer described in this paper exhibited advantages over methods using fiber optic cables for the signal transfer system. This transformer has no jitter or breakdown problems that invariably occur in active circuit components.

  12. Large Topographic Rises on Venus: Implications for Mantle Upwelling

    Science.gov (United States)

    Stofan, Ellen R.; Smrekar, Suzanne E.; Bindschandler, Duane L.; Senske, David A.

    1995-01-01

    Topographic rises on Venus have been identified that are interpreted to be the surface manifestation of mantle upwellings. These features are classified into groups based on their dominant morphology. Atla and Beta Regiones are classified as rift-dominated, Dione, western Eistla, Bell, and Imdr Regiones as volcano-dominated, and Themis, eastern Eistla, and central Eistla Regiones as corona-dominated. At several topographic rises, geologic indicators were identified that may provide evidence of uplifted topography (e.g., volcanic flow features trending upslope). We assessed the minimum contribution of volcanic construction to the topography of each rise, which in general represents less than 5% of the volume of the rise, similar to the volumes of edifices at terrestrial hotspot swells. The total melt volume at each rise is approximated to be 10(exp 4) - 10(exp 6) cu km. The variations in morphology, topography, and gravity signatures at topographic rises are not interpreted to indicate variations in stage of evolution of a mantle upwelling. Instead, the morphologic variations between the three classes of topographic rises are interpreted to indicate the varying influences of lithospheric structure, plume characteristics, and regional tectonic environment. Within each class, variations in topography, gravity, and amount of volcanism may be indicative of differing stages of evolution. The similarity between swell and volcanic volumes for terrestrial and Venusian hotspots implies comparable time-integrated plume strengths for individual upwellings on the two planets.

  13. VE of construction industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-10-15

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  14. VE of construction industry

    International Nuclear Information System (INIS)

    1987-10-01

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  15. Calculating utility prudency issue costs

    International Nuclear Information System (INIS)

    Nielsen, K.R.

    1985-01-01

    The nuclear industry, particularly utilities and their construction, engineering and vendor agents, is faced with a surging increase in prudency management audits. What started as primarily a nuclear project-oriented requirement has spread to encompass most significant utility capital construction projects. Such audits are often a precedent condition to commencement of rate hearings. The cost engineer, a primary major capital construction project participant, is required to develop or critique ''prudency issue'' costs as part of such audits. Although utility costs in the broadest sense are potentially at issue, this paper concentrates on the typical project/construction management costs. The costs of design, procurement and construction are all subject to the calculation process

  16. Prefabrication in Building Construction: A Perspective of Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Nafees Ahmed Memon

    2014-07-01

    Full Text Available Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight method as a MCDM approach. The results depict that main advantages of prefabrication are ?Shorter construction time? and ?Less construction site waste?. The top hindrances in adopting prefabrication as identified in this study are: ?Higher initial construction cost? and ?Inflexible for design changes?. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan

  17. Prefabrication in building construction: a perspective of pakistan construction industry

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.; Khehro, S.H.

    2014-01-01

    Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight) method as a MCDM approach. The results depict that main advantages of prefabrication are Shorter construction time and Less construction site waste. The top hindrances in adopting prefabrication as identified in this study are: Higher initial construction cost and Inflexible for design changes. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan. (author)

  18. Humidity Distributions in Multilayered Walls of High-rise Buildings

    Science.gov (United States)

    Gamayunova, Olga; Musorina, Tatiana; Ishkov, Alexander

    2018-03-01

    The limitation of free territories in large cities is the main reason for the active development of high-rise construction. Given the large-scale projects of high-rise buildings in recent years in Russia and abroad and their huge energy consumption, one of the fundamental principles in the design and reconstruction is the use of energy-efficient technologies. The main heat loss in buildings occurs through enclosing structures. However, not always the heat-resistant wall will be energy-efficient and dry at the same time (perhaps waterlogging). Temperature and humidity distributions in multilayer walls were studied in the paper, and the interrelation of other thermophysical characteristics was analyzed.

  19. Solid construction waste management in large civil construction companies through use of specific software - case study

    Directory of Open Access Journals (Sweden)

    Caio Dalla Zanna

    2017-05-01

    Full Text Available In the current construction market there is a high demand for sustainability. In addition to that the Brazilian government is enacting tougher and tougher legislation on the disposal of solid construction waste. These demands increasingly make the construction company responsible for the entire lifecycle of its waste as well as the accompanying cost and environmental impact of solid waste. A software program was used in the research which allows construction companies gather information about waste. This helps the decision makers, at all different levels of the company improving waste management through better decisions. The software program was used during the construction of two residential buildings, constructed by a large construction company in the South of Brazil. Five key performance indicators were used by the construction company team: Generated Waste Height (cm, cost per built area (R$ m-², Waste Segregation Quality Index (WSQI, Effective Waste Management Index (EWMI and Waste Management Quality Index (WMQI. After four months the total cost of waste management was R$ 83,551.71 for site A and R$ 91,668.02 for site B. About 70% of the waste was raw material waste. The software program provided information not previously available, which made it possible to calculate the cost of material loss, indicating corrective actions, all without losing sight of cost reduction opportunities for the management of Solid construction Waste (SCW.

  20. Determination of sustainable values for the parameters of the construction of residential buildings

    Science.gov (United States)

    Grigoreva, Larisa; Grigoryev, Vladimir

    2018-03-01

    For the formation of programs for housing construction and planning of capital investments, when developing the strategic planning companies by construction companies, the norms or calculated indicators of the duration of the construction of high-rise residential buildings and multifunctional complexes are mandatory. Determination of stable values of the parameters for the high-rise construction residential buildings provides an opportunity to establish a reasonable duration of construction at the planning and design stages of residential complexes, taking into account the influence of market conditions factors. The concept of the formation of enlarged models for the high-rise construction residential buildings is based on a real mapping in time and space of the most significant redistribution with their organizational and technological interconnection - the preparatory period, the underground part, the above-ground part, external engineering networks, landscaping. The total duration of the construction of a residential building, depending on the duration of each redistribution and the degree of their overlapping, can be determined by one of the proposed four options. At the same time, a unified approach to determining the overall duration of construction on the basis of the provisions of a streamlined construction organization with the testing of results on the example of high-rise residential buildings of the typical I-155B series was developed, and the coefficients for combining the work and the main redevelopment of the building were determined.

  1. Cost benefit justification of nuclear plant reliability improvement

    International Nuclear Information System (INIS)

    El-Sayed, M.A.H.; Abdelmonem, N.M.

    1985-01-01

    The design of the secondary steam loop of the nuclear power plant has a significant effect on the reliability of the plant. Moreover, the necessity to cool a reactor safely has increased the reliability demanded from the system. The rapidly rising construction costs and fuel prices in recent years have stimulated a great deal in optimizing the productivity of a nuclear power plant through reliability improvement of the secondary steamloop and the reactor cooling system. A method for evaluating the reliability of steam loop and cooling system of a nuclear power plant is presented. The method utilizes the cut-set technique. The developed method can be easily used to show to what extent the overall reliability of the nuclear plant is affected by the possible failures in the steam and cooling subsystem. A model for calculating the increase in the nuclear plant productivity resulting from a proposed improvement in the two subsystems reliability is discussed. The model takes into account the capital cost of spare parts for several components, replacement energy, operating and maintenance costs

  2. High-rise architecture in Ufa, Russia, based on crystallography canons

    Science.gov (United States)

    Narimanovich Sabitov, Ildar; Radikovna Kudasheva, Dilara; Yaroslavovich Vdovin, Denis

    2018-03-01

    The article considers fundamental steps of high-rise architecture forming stylistic tendencies, based on C. Willis and M. A. Korotich's studies. Crystallographic shaping as a direction is assigned on basis of classification by M. A. Korotich's. This direction is particularly examined and the main high-rise architecture forming aspects on basis of natural polycrystals forming principles are assigned. The article describes crystal forms transformation into an architectural composition, analyzes constructive systems within the framework of CTBUH (Council on Tall Buildings and Urban Habitat) classification, and picks out one of its types as the most optimal for using in buildings-crystals. The last stage of our research is the theoretical principles approbation into an experimental project of high-rise building in Ufa with the description of its contextual dislocation aspects.

  3. The costs of nuclear power

    International Nuclear Information System (INIS)

    Vestenhaug, O.; Sauar, T.O.; Nielsen, P.O.

    1979-01-01

    A study has been made by Scandpower A/S of the costs of nuclear power in Sweden. It is based on the known costs of existing Swedish nuclear power plants and forecasts of the expected costs of the Swedish nuclear power programme. special emphasis has been put on the fuel cycle costs and future costs of spent fuel processing, waste disposal and decommissioning. Costs are calculated in 1978 Swedish crowns, using the retail price index. An actual interest rate of 4% is used, with depreciation period of 25 years and a plant lifetime of 30 years. Power production costs are estimated to be about 7.7 oere/kWh in 1978, rising to 10.5 oere/kWh in 2000. The cost is distributed with one third each to capital costs, operating costs and fuel costs, the last rising to 40% of the total at the end of the century. The main single factor in future costs is the price of uranium. If desired, Sweden can probably be self-sufficient in uranium in 2000 at a lower cost than assumed here. National research costs which, in Scandpower's opinion, can be debited to the commercial nuclear power programme are about 0.3 oere/kWh. (JIW)

  4. Prevention program at construction worksites aimed at improving health and work ability is cost-saving to the employer: Results from an RCT

    NARCIS (Netherlands)

    Oude Hengel, K.M.; Bosmans, J.E.; Dongen, J.M. van; Bongers, P.M.; Beek, A.J. van der; Blatter, B.M.

    2014-01-01

    Background: To prolong sustainable healthy working lives of construction workers, a prevention program was developed which aimed to improve the health and work ability of construction workers. The objective of this study was to analyze the cost-effectiveness and financial return from the employers'

  5. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    Science.gov (United States)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  6. Maintenance management balancing performance maintenance and cost balance at reinforced concrete constructions of the fossil-fuel and nuclear power stations

    International Nuclear Information System (INIS)

    Ito, Hiroshi; Benno, Hiroshi; Ozaki, Mitsuhiro

    2003-01-01

    Life elongation of concrete constructions (CCs) is a very important needs for supporting future safe supply of electric power. However, some CCs constructed and used for a long term at fossil-fuel and nuclear power stations had reduction of their required performance by deterioration based on environmental and using conditions represented by salt-damage. As such constructions are anxious to increase in future, it is necessary to keep reliability of their establishments by providing desired rehabilitation to persist supplying effect of their facilities. On the other hand, as it is also essential to progress keeping and reducing cost of power generation together with development of recent liberalization of electric power, it is an important subject how to keep their performance maintenance and cost balance. Therefore, here were outlined on required performance setting method, inspection method, long-term deterioration forecasting and evaluating methods, selection method of countermeasure scenarios minimizing LCC, inspection period setting method, introduction of database and deterioration forecasting system, and so on, to economically maintain and manage already built reinforced concrete constructions at suitable materials and places to elongate their lives. (G.K.)

  7. A Methodology for Constructing Marginal Abatement Cost Curves for Climate Action in Cities

    Directory of Open Access Journals (Sweden)

    Nadine Ibrahim

    2016-03-01

    Full Text Available As drivers of climate action, cities are taking measures to reduce greenhouse gas (GHG emissions, which if left unabated pose a challenge to meeting long-term climate targets. The economics of climate action needs to be at the forefront of climate dialogue to prioritize investments among competing mitigation measures. A marginal abatement cost (MAC curve is an effective visualization of climate action that initiates a technical and economic discussion of the cost-effectiveness and abatement potential of such actions among local leaders, policy makers, and climate experts. More commonly demonstrated for countries, MAC curves need to be developed for cities because of their heterogeneity, which vary in their urban activities, energy supply, infrastructure stock, and commuting patterns. The methodology for constructing bottom-up MAC curves for cities is presented for technologies that offer fuel switching and/or energy efficiencies, while considering technology lifetimes, city-specific electricity and fuel prices, and emission intensities. Resulting MAC curves are unique to every city, and chart the pathway towards low-carbon growth by prioritizing measures based on cost-effectiveness. A case study of Toronto’s climate targets demonstrates the prioritization of select technologies. Leveraging MAC curves to support climate programs enables cities to strategically invest in financing climate action and designing incentives.

  8. International comparison of the economy of constructing nuclear power plants by using the method of referred investment costs in Czechoslovakia and in the USA

    International Nuclear Information System (INIS)

    Majer, P.; Jelen, J.

    1989-01-01

    The method of referred investment costs was applied to a comparison of the economy of constructing the nuclear power plant at Temelin, Czechoslovakia, with that for the hypothetic nuclear power plant at Middletown, USA. For a reasonably adopted Czechoslovak crown/USD rate, the obtained costs for building the Temelin power plant are 50% higher than those for building the reference Middletown power plant. This compares rather favorably with the general level of investment costs in Czechoslovakia under the present economic conditions. The analysis performed shows that savings in investment costs should be sought in the fields of technological modernization of preparatory work and in all construction work, with the aim to reduce particularly live work. (P.A.). 12 tabs., 8 refs

  9. Design, construction and commissioning of a simple, low cost permanent magnet quadrupole doublet

    International Nuclear Information System (INIS)

    Conard, E.M.; Parcell, S.K.; Arnott, D.W.

    1999-01-01

    In the framework of new beam line developments at the Australian National Medical Cyclotron, a permanent magnet quadrupole doublet was designed and built entirely in house. The design proceeded from the classical work by Halbach et al. but emphasised the 'low cost' aspect by using simple rectangular NdFeB blocks and simple assembly techniques. Numerical simulations using the (2-D) Gemini code were performed to check the field strength and homogeneity predictions of analytical calculations. This paper gives the reasons for the selection of a permanent magnet, the design and construction details of the quadrupole doublet and its field measurement results. (authors)

  10. Comparative Study on the Cost of Building Public House Construction Using Red Brick and Interlock Brick Building Material in the City of Banda Aceh

    Science.gov (United States)

    Malahayati, Nurul; Hayati, Yulia; Nursaniah, Cut; Firsa, T.; Fachrurrazi; Munandar, Aris

    2018-05-01

    Red brick and interlocking brick are the building materials that are often used for wall installation work on houses construction. In the development of building materials technology and cost savings, interlocking brick can be alternative to replace red bricks. In Aceh Province, the use of interlocking bricks is less popular compared to other big cities in Indonesia. Interlocking brick is made from a mixture of clay, concrete sand and compacted cement and one of the environmentally friendly materials because it does not burn the process like red brick material. It is named interlocking brick because the installation method is locked together and it serves as a structural and partition wall of residential buildings. The aims of this study are to compare the cost of building a house in Banda Aceh City using red brick and interlock brick building materials. The data were obtained from interviews and questionnaires distributed to respondents who had built houses in Banda Aceh City. The results concluded that the house construction cost using interlock brick offer lower construction cost at comparable quality rather than using red brick.

  11. Construction and cost experience regarding the 2nd pool house for spent fuel storage facility in the Atucha Power Station

    International Nuclear Information System (INIS)

    Barbosa, C.A.

    1980-01-01

    The Atucha I second pool house storage for spent fuel is designed as an extension of the Atucha I power station. The two are linked by civil structure, controlling circuits, electrical and compressed air and water supplies, low level wastes disposal, ventilation under pressure maintenance, and, most important, the ability to transfer spent and new fuel in both directions. Because the second pool house is, by location and design, an extension of the existing installation, and since there is no design departure, regarding storage and transfer of fuel from that of the original installation, the rules and regulations applied for its construction were the same as those valid for the Atucha I construction. The requirement not to exceed a four-year period for construction and commissioning was determined by the need to have storage room for the Atucha I fuel. Argentina will meet the 1982 target by having the installation available during the second half of 1981. The second pool house is a wet storage location with a capacity of 1000 tons metallic uranium. It was designed by the Kraftwerk Union of West Germany along the same lines as the 440-ton storage location originally built with the station. The Atomic Energy Commission of Argentina has managed the construction and participated in project and design stages. As in the original pool, the 6 m long assemblies are stacked in double tiers. The cost figures which are mentioned differ from previously released figures and are not the final ones. With civil construction almost finished and mechanical erection started, the present estimates should not differ by more than 10% from the final figures. The installation has an investment cost of 61 million dollars, (1980), and, depending on the amortization time span considered, a total yearly cost per kg of capacity of metallic uranium, ranging between 5.5 and 9.3 dollars per kg

  12. U.S. Dental School Deans’ Perceptions of the Rising Cost of Dental Education and Borrowing Pressures on Dental Students: Report of Survey Results.

    Science.gov (United States)

    McAllister, Dora Elías; Garrison, Gwen E; Feldman, Cecile A; Anderson, Eugene L; Cook, Bryan J; Valachovic, Richard W

    2015-06-01

    This report presents findings from a survey of U.S. dental school deans designed to capture their perceptions regarding the rising cost of dental education and its impact on borrowing by dental students to finance their education. The survey included questions about factors influencing the cost of dental education, concerns about dental student borrowing, and financial awareness resources for students. The survey was distributed to the deans of all 63 U.S. dental schools in January 2013; 42 deans responded, for a 67% response rate. The results indicate that, according to the responding deans, new clinical technologies, technology costs, and central university taxes are the main factors that contribute to the increasing cost of dental education. Coupled with reduced state appropriations at public dental schools and declines in private giving at all dental schools, dental school deans face a perplexing set of financial management challenges. Tuition and fees are a primary source of revenue for all dental schools; however, many deans do not have total control over the cost of attending their schools since tuition and fees are often tied to mandates and policies from the parent university and the state legislature. The findings of this study indicate that U.S. dental school deans are aware of and concerned about the impact of increases in tuition and fees on dental student debt and that they are using a variety of strategies to address the growth in dental student borrowing.

  13. Profit ability versus construction equipment maintenance

    OpenAIRE

    Clutts, Craig A.

    2010-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited Construction equipment is a high cost of capital investment necessary for the successful existence of a private construction company and essential to the mission success of the Naval Construction Force (NCF). The highest impact cost factor other than the initial purchase investment is the expenses related to maintenance and repair. As the equipment ages, the ownership costs decrease an...

  14. Residential High-Rise Clusters as a Contemporary Planning Challenge in Manama

    Directory of Open Access Journals (Sweden)

    Florian Wiedmann

    2015-08-01

    Full Text Available This paper analyzes the different roots of current residential high-rise clusters emerging in new city districts along the coast of Bahrain’s capital city Manama, and the resulting urban planning and design challenges. Since the local real-estate markets were liberalized in Bahrain in 2003, the population grew rapidly to more than one million inhabitants. Consequently, the housing demand increased rapidly due to extensive immigration. Many residential developments were however constructed for the upper spectrum of the real-estate market, due to speculative tendencies causing a raise in land value. The emerging high-rise clusters are developed along the various waterfronts of Manama on newly reclaimed land. This paper explores the spatial consequences of the recent boom in construction boom and the various challenges for architects and urban planners to enhance urban qualities.

  15. Determination of sustainable values for the parameters of the construction of residential buildings

    Directory of Open Access Journals (Sweden)

    Grigoreva Larisa

    2018-01-01

    Full Text Available For the formation of programs for housing construction and planning of capital investments, when developing the strategic planning companies by construction companies, the norms or calculated indicators of the duration of the construction of high-rise residential buildings and multifunctional complexes are mandatory. Determination of stable values of the parameters for the high-rise construction residential buildings provides an opportunity to establish a reasonable duration of construction at the planning and design stages of residential complexes, taking into account the influence of market conditions factors. The concept of the formation of enlarged models for the high-rise construction residential buildings is based on a real mapping in time and space of the most significant redistribution with their organizational and technological interconnection - the preparatory period, the underground part, the above-ground part, external engineering networks, landscaping. The total duration of the construction of a residential building, depending on the duration of each redistribution and the degree of their overlapping, can be determined by one of the proposed four options. At the same time, a unified approach to determining the overall duration of construction on the basis of the provisions of a streamlined construction organization with the testing of results on the example of high-rise residential buildings of the typical I-155B series was developed, and the coefficients for combining the work and the main redevelopment of the building were determined.

  16. The economic impact of sea-level rise on nonmarket lands in Singapore.

    Science.gov (United States)

    Ng, Wei-Shiuen; Mendelsohn, Robert

    2006-09-01

    Sea-level rise, as a result of climate change, will likely inflict considerable economic consequences on coastal regions, particularly low-lying island states like Singapore. Although the literature has addressed the vulnerability of developed coastal lands, this is the first economic study to address nonmarket lands, such as beaches, marshes and mangrove estuaries. This travel cost and contingent valuation study reveals that consumers in Singapore attach considerable value to beaches. The contingent valuation study also attached high values to marshes and mangroves but this result was not supported by the travel cost study. Although protecting nonmarket land uses from sea-level rise is expensive, the study shows that at least highly valued resources, such as Singapore's popular beaches, should be protected.

  17. Synthesis on construction unit cost development : technical report.

    Science.gov (United States)

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  18. Nuclear power plant construction activity, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors

  19. The Use Potential of Traditional Building Materials for the Realization of Structures by Modern Methods of Construction

    Directory of Open Access Journals (Sweden)

    Spišáková Marcela

    2015-11-01

    Full Text Available The sustainable building has taken off in recent years with many investors looking for new and different methods of construction. The traditional building materials can be made out of natural materials, while others can help to lower energy costs of the occupant once built. Regardless of what the goal of the investor is, traditional building materials and their use is on the rise. The submitted paper provides an overview of natural building materials and possible modern building systems using these construction materials. Based on the questionnaire survey is defined the use potential of traditional building materials for the realization of the construction by methods of modern constructions and then are determined the drivers and barriers of traditional materials through using modern methods of construction. Considering the analysis of the achieved results, we can identify the gaps in the construction market in Slovakia and also to assess the perception of potential investors in the field of traditional building materials use, which is the purpose of submitted paper.

  20. Factors Affecting Competitive Strategies in International Construction Companies

    OpenAIRE

    Tuğçe ERCAN; Almula KÖKSAL

    2013-01-01

    Due to rising competition in the international construction market, competitive strategies are becoming ever more important. This study aims to identify the level of importance of a variety of competitive strategies in construction companies to create a theoretical framework for competitive strategies in international construction business. In the questionnaire titled: ‘Identifying the Parameters of Strategic Performance Comparison Tool in International Construction Companies’, professionals ...

  1. Using Purchasing Power Parity to Assess Construction Productivity

    Directory of Open Access Journals (Sweden)

    Rick Best

    2010-12-01

    Full Text Available For many reasons comparing construction productivity between countries is a difficult task. One key problem is that of converting construction costs to a common currency. This problem can be overcome relatively simply by using a basket of construction materials and labour, termed a BLOC (Basket of Locally Obtained Commodities, as a unit of construction cost. Average BLOC costs in each location are calculated from data obtained from a number of sources (quantity surveyors, estimators. Typical building costs obtained from published construction cost data are expressed in BLOC equivalents. Lower BLOC equivalents represent higher productivity as other inputs (largely materials are constant. The method provides a relatively simple and direct method for comparing productivity between different locations.

  2. Cost reduction and safety design features of new nuclear power plants in India. Annex 13

    International Nuclear Information System (INIS)

    Sharma, V.K.

    2002-01-01

    Indian Nuclear Power Programme is designed to exploit limited reserves of uranium and extensive resource of thorium. Pressurised heavy water reactors are found most suitable and form the main stay of the first stage of the programme. Thorium utilisation is achieved in the second and third stages. Today India has total installed capacity of 2720 MWe of PHWRs which are operating with high plant load factors of over 80%. Rich experience of construction and operation of over 150 reactor years is being utilised in effecting cost reduction and safety improvements. Standardisation and reduction in gestation period by preproject activities, advance procurement and work packages of engineer, procure, construct and commission are some of the techniques being adopted for cost reduction in the new projects. But the cost of safety is rising. Design basis event of double ended guillotine rupture of primary pressure boundary needs a relook based on current knowledge of material behaviour. This event appears improbable. Similarly some of the safety related systems like closed loop cooling water operating at low temperature and pressure, and low usage factors may be designed as per standard codes without invoking special nuclear requirements. The paper will address these issues and highlight the possible areas for cost reduction both in operating and safety systems. Modern construction and project management techniques are being employed. Gestation period of 5 years and cost of less than US $1400 per KWe are the present targets. In Indian environment nuclear power is found to be competitive with thermal power plants at distances of about 800 Kms from the coal mines. (author)

  3. Construction delays causing risks on time and cost - a critical review

    Directory of Open Access Journals (Sweden)

    Chidambaram Ramanathan

    2012-02-01

    Full Text Available There is an increase in the number of construction projects experiencing extensive delays leading to exceeding initial time and cost budget.  This paper reviews 41 studies around the world which surveyed the delay factors and classified them into Groups.  The main purpose of this paper is to review literature, each of which have categorized the causes that are responsible for time delays and cost overrun in projects. The collected list has 113 causes for delays categorized in to 18 different groups.  Most of the researches have analysed the responses from the Questionnaire survey.    The collected data are used to rank the problem.  The data are further used to investigate and analyse Important Index, Frequency Index, Severity Index, Relative Important Index, Relative Importance Weight, Weighted Average, Mean, Standard Deviation and Variance.  The collective comparison has revealed that the ranking given by all the researchers is not the same.  Further each and every study has different rank ratings for the different group of the delays.  This review paper attempts to provide an updated compilation of the earlier studies on ranking of the delay causers, which are never similar and constant for universal projects.  It is concluded that a separate study is required for identifying the factors causing delay for projects operated in Sabah, East Malaysia.

  4. The construction and operation of a low-cost poultry waste digester.

    Science.gov (United States)

    Steinsberger, S C; Shih, J C

    1984-05-01

    A simple and low-cost poultry waste digester (PWD) was constructed to treat the waste from 4000 caged laying hens on University Research Unit No. 2 at North Carolina State University. The system was built basically of a plastic lining with insulation, a heating system, a hot-water tank, and other metering equipment. It was operated at 50 degrees C and pH 7.5-8.0. The initiation of methane production was achieved using the indigenous microflora in the poultry waste. At an optimal loading rate (7.5 kg volatile solids/m(3) day), the PWD produced biogas (55% methane) at a rate of 4.0 m(3)/m(3) day. The PWD was biologically stable and able to tolerate temporary overloads and shutdowns. A higher loading rate failed to maintain a high gas production rate and caused drops in methane content and pH value. Under optimal conditions, a positive energy balance was demonstrated with a net surplus of 50.6% of the gross energy. For methane production, the PWD system was proved to be technically feasible. The simple design and inexpensive materials used for this model could significantly reduce the cost of digestion compared to more conventional systems. More studies are needed to determine the durability, the required maintenance of the system, and the most economical method of biogas and solid residue utilization.

  5. Proprietary hospitals in cost containment.

    Science.gov (United States)

    Jones, D A

    1985-08-23

    Any effort to control the rise in health care costs must start with analyzing the causes, which are really quite simple. Most cost control efforts fail because they do not address the causes. The causes are large subsidies in several forms that send a false message that health care is free and should be used abundantly, and expansive reimbursement programs that reward inefficient providers with higher payments. This combination of demand stimulation and cost-plus reimbursement produced the world's most expensive health care delivery system and strident calls for reform. A long overdue change in public policy took effect October 1, 1983, when Medicare payments moved from cost-plus reimbursement to fixed, prospectively determined prices. Because it addressed one of the causes of medical inflation, this change has been effective in slowing the rise in Medicare expenditures. Sponsorship of a hospital is not a determinant of its cost-effectiveness. There are examples of efficient and inefficient hospitals in both the voluntary and the investor-owned or taxpaying hospitals. The determining factor is the will of management to keep costs under control.

  6. A composition for protection the stylobate in high-rise construction from the harmful effects of car exhaust gases

    Science.gov (United States)

    Sokolova, Irina

    2018-03-01

    In large cities, high-rise buildings are usually located along highways with heavy traffic. The study was carried out with the aim of creating a material for protection the stylobate of a high-rise building from the harmful effects of car exhaust gases. A polymer-silicate composition based on schungite and schungisite components is proposed. The composition has the properties of a wall material resistant to the corrosive environment of car exhaust gases. The results of the composition studies are presented. The possibility of increase the durability of exterior slabs for stylobate walls of high-rise buildings is substantiated, provided the proposed material is applied.

  7. Influence of rising commodity prices on energy policy

    International Nuclear Information System (INIS)

    Keppo, I.J.

    2009-04-01

    During the past few years we have first witnessed a rapid increase in the prices of commodities and then later, as a consequence of the economic downturn, an even more drastic drop. Simultaneously with the commodity price increase, an increase in the investment costs of power plants was experienced. The rise in material costs was often stated as one of the reasons for this increase. In this study the relationship between commodity costs and energy prices is studied. A bottom-up approach is used for estimating what kind of an impact increased commodity prices alone could be expected to have on the investment costs on the one hand, and how increased energy prices may affect commodity production costs on the other. The results indicate that although the commodity production costs usually have a fairly large energy component, even high increases in commodity prices, and therefore raw material costs of power plant investments, can not explain the recently experienced hikes in power plant investment costs; a doubling of the costs of the main raw material flows could explain an investment cost increase of some 5-10%, depending on the power plant type. This would seem to indicate that other contributing factors, such as bottlenecks in the production of power plant components, may play an important role in the recent investment cost increase

  8. Risk management at the stage of design of high-rise construction facilities

    Science.gov (United States)

    Politi, Violetta

    2018-03-01

    This paper describes the assessment of the probabilistic risk of an accident formed in the process of designing a technically complex facility. It considers values of conditional probabilities of the compliance of load-bearing structures with safety requirements, provides an approximate list of significant errors of the designer and analyzes the relationship between the degree of compliance and the level of danger of errors. It describes and proposes for implementation the regulated procedures related to the assessment of the safety level of constructive solutions and the reliability of the construction process participants.

  9. The delivery of low-cost, low-carbon rural energy services

    Energy Technology Data Exchange (ETDEWEB)

    Casillas, Christian E., E-mail: cecasillas@berkeley.edu [Energy and Resources Group, University of California, Berkeley (United States); Kammen, Daniel M. [Energy and Resources Group, University of California, Berkeley (United States); Goldman School of Public Policy, University of California, Berkeley, CA 94720 (United States); The World Bank, Washington, DC 20433 (United States)

    2011-08-15

    The provision of both electrical and mechanical energy services can play a critical role in poverty alleviation for the almost two billion rural users who currently lack access to electricity. Distributed generation using diesel generators remains a common means of electricity provision for rural communities throughout the world. Due to rising fuel costs, the need to address poverty, and consequences of global warming, it is necessary to develop cost efficient means of reducing fossil fuel consumption in isolated diesel microgrids. Based on a case study in Nicaragua, a set of demand and supply side measures are ordered by their annualized costs in order to approximate an energy supply curve. The curve highlights significant opportunities for reducing the costs of delivering energy services while also transitioning to a carbon-free electrical system. In particular, the study demonstrates the significant cost savings resulting from the implementation of conventional metering, efficient residential lighting, and electricity generation using renewable energy sources. - Highlights: > We present a case study of conservation measures implemented in a diesel microgrid. > An energy conservation and supply curve is constructed using additional measures. > Energy efficiency and renewable energy result in cost savings and carbon abatement. > We discuss weaknesses of energy supply and carbon abatement curve calculations

  10. Determination of Temperature Rise and Temperature Differentials of CEMII/B-V Cement for 20MPa Mass Concrete using Adiabatic Temperature Rise Data

    Science.gov (United States)

    Chee Siang, GO

    2017-07-01

    Experimental test was carried out to determine the temperature rise characteristics of Portland-Fly-Ash Cement (CEM II/B-V, 42.5N) of Blaine fineness 418.6m2/kg and 444.6m2/kg respectively for 20MPa mass concrete under adiabatic condition. The estimation on adiabatic temperature rise by way of CIRIA C660 method (Construction Industry Research & Information Information) was adopted to verify and validate the hot-box test results by simulating the heat generation curve of the concrete under semi-adiabatic condition. Test result found that Portland fly-ash cement has exhibited decrease in the peak value of temperature rise and maximum temperature rise rate. The result showed that the temperature development and distribution profile, which is directly contributed from the heat of hydration of cement with time, is affected by the insulation, initial placing temperature, geometry and size of concrete mass. The mock up data showing the measured temperature differential is significantly lower than the technical specifications 20°C temperature differential requirement and the 27.7°C limiting temperature differential for granite aggregate concrete as stipulated in BS8110-2: 1985. The concrete strength test result revealed that the 28 days cubes compressive strength was above the stipulated 20MPa characteristic strength at 90 days. The test demonstrated that with proper concrete mix design, the use of Portland flyash cement, combination of chilled water and flake ice, and good insulation is effective in reducing peak temperature rise, temperature differential, and lower adiabatic temperature rise for mass concrete pours. As far as the determined adiabatic temperature rise result was concern, the established result could be inferred for in-situ thermal properties of 20MPa mass concrete application, as the result could be repeatable on account of similar type of constituent materials and concrete mix design adopted for permanent works at project site.

  11. Comparison of Different Assembling Techniques Regarding Cost, Durability, and Ecology - A Survey of Multi-layer Wooden Panel Assembly Load-Bearing Construction Elements

    Directory of Open Access Journals (Sweden)

    Dietrich Buck

    2015-10-01

    Full Text Available Wood is a pure, sustainable, renewable material. The increasing use of wood for construction can improve its sustainability. There are various techniques to assemble multi-layer wooden panels into prefabricated, load-bearing construction elements. However, comparative market and economy studies are still scarce. In this study, the following assembling techniques were compared: laminating, nailing, stapling, screwing, stress laminating, doweling, dovetailing, and wood welding. The production costs, durability, and ecological considerations were presented. This study was based on reviews of published works and information gathered from 27 leading wood product manufacturing companies in six European countries. The study shows that the various techniques of assembling multi-layer wooden construction panel elements are very different. Cross laminated timber (CLT exhibited the best results in terms of cost and durability. With regard to ecological concerns, dovetailing is the best. Taking into account both durability and ecological considerations, wooden screw-doweling is the best. These alternatives give manufacturers some freedom of choice regarding the visibility of surfaces and the efficient use of lower-quality timber. CLT is the most cost-effective, is not patented, and is a well-established option on the market today.

  12. Progress in resolving construction issues on nuclear projects

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1985-01-01

    The cost of nuclear plant construction in the United States can be drastically reduced. Progress is being made in the reduction of construction costs and with continuing effort much more can be done. The easiest way to attack high costs is to eliminate the unnecessary repairs and rework in construction, along with the time consuming evaluations and dispositions, and to use common sense in design practices. By doing this, millions of dollars could easily be cut from the cost of construction of nuclear powerplants

  13. Adaptation to the Impacts of Sea Level Rise in Egypt

    International Nuclear Information System (INIS)

    El-Raey, M.; Dewidar, K.R.; El-Hattab, M.

    1999-01-01

    Assessment of the vulnerability and expected socioeconomic losses over the Nile delta coast due to the impact of sea level rise is carried out in details. Impacts of sea level rise over the Governorates of Alexandria and Port Said in particular, are evaluated quantitatively. Analysis of the results at Alexandria Governorate indicate that, if no action is taken, an area of about 30% of the city will be lost due to inundation. Almost 2 million people will have to abandon their homeland; 195,000 jobs will be lost and an economic loss of over $3.5 Billion is expected over the next century. At Port Said Governorate results indicate that beach areas are most severely affected (hence tourism), followed by urban areas. The agriculture sector is the least affected sector. It is estimated that the economic loss is over $ 2.0 Billion for 0.50 m SLR and may exceed $ 4.4 Billion for 1.25 m SLR. Options and costs of adaptation are analyzed and presented. Multi-criteria and decision matrix approaches, based on questionnaire surveys are carried out to identify priorities for the two cases. Analysis of these techniques of two options; the current policy (hard protection measures on some vulnerable areas) and no action (stopping these activities) have the lowest scores. Beach nourishment and integrated coastal zone management (ICZM) have the highest scores, however ICZM has high cost measures. The most cost effective option is the land-use change, however with relatively very high cost measure. It is recommended that an ICZM approach be adopted since it provides a reasonable trade off between costs and cost effectiveness. 14 refs

  14. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    Science.gov (United States)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  15. Cost and Price Increases in Higher Education: Evidence of a Cost Disease on Higher Education Costs and Tuition Prices and the Implications for Higher Education Policy

    Science.gov (United States)

    Trombella, Jerry

    2011-01-01

    As concern over rapidly rising college costs and tuition sticker prices have increased, a variety of research has been conducted to determine potential causes. Most of this research has focused on factors unique to higher education. In contrast, cost disease theory attempts to create a comparative context to explain cost increases in higher…

  16. Asset Prices and Trading Volume under Fixed Transactions Costs.

    Science.gov (United States)

    Lo, Andrew W.; Mamaysky, Harry; Wang, Jiang

    2004-01-01

    We propose a dynamic equilibrium model of asset prices and trading volume when agents face fixed transactions costs. We show that even small fixed costs can give rise to large "no-trade" regions for each agent's optimal trading policy. The inability to trade more frequently reduces the agents' asset demand and in equilibrium gives rise to a…

  17. Advanced design and construction technology for ABWR

    International Nuclear Information System (INIS)

    Kawahara, Akira

    2003-01-01

    Recently, many countries start planning to construct nuclear plants, and the electric power companies and the plant suppliers are acutely aware of the importance of the technical infrastructure required for construction planning and execution as this has a significant influence on construction costs. Plant suppliers in Japan have been focusing its attention on the efficiency of construction from earlier, because of its significant role in determining overall construction costs. Through continuous efforts to reduce fieldwork costs, we have developed unique technologies, especially the 3D-CAD system and other advanced construction technologies including modularization. We, plant suppliers are now turning its attention to overseas nuclear plants construction also, and are developing more rational, economical, and global construction based on its vast experience in construction techniques. In this report, the evolution of plant engineering methods and construction technologies, the present level of progress in construction, and technical developments for the future, are described. (author)

  18. Methods and problems in assessing the impacts of accelerated sea-level rise

    Science.gov (United States)

    Nicholls, Robert J.; Dennis, Karen C.; Volonte, Claudio R.; Leatherman, Stephen P.

    1992-06-01

    Accelerated sea-level rise is one of the more certain responses to global warming and presents a major challenge to mankind. However, it is important to note that sea-level rise is only manifest over long timescales (decades to centuries). Coastal scientists are increasingly being called upon to assess the physical, economic and societal impacts of sea-level rise and hence investigate appropriate response strategies. Such assessments are difficult in many developing countries due to a lack of physical, demographic and economic data. In particular, there is a lack of appropriate topographic information for the first (physical) phase of the analysis. To overcome these difficulties we have developed a new rapid and low-cost reconnaissance technique: ``aerial videotape-assisted vulnerability analysis'' (AVA). It involves: 1) videotaping the coastline from a small airplane; 2) limited ground-truth measurements; and 3) archive research. Combining the video record with the ground-truth information characterizes the coastal topography and, with an appropriate land loss model, estimates of the physical impact for different sea-level rise scenarios can be made. However, such land loss estimates raise other important questions such as the appropriate seaward limit of the beach profile. Response options also raise questions such as the long-term costs of seawalls. Therefore, realistic low and high estiimates were developed. To illustrate the method selected results from Senegal, Uruguay and Venezuela are presented.

  19. Analysis of Potential Benefits and Costs of Adopting a Commercial Building Energy Standard in South Dakota

    Energy Technology Data Exchange (ETDEWEB)

    Belzer, David B.; Cort, Katherine A.; Winiarski, David W.; Richman, Eric E.

    2005-03-04

    The state of South Dakota is considering adopting a commercial building energy standard. This report evaluates the potential costs and benefits to South Dakota residents from requiring compliance with the most recent edition of the ANSI/ASHRAE/IESNA 90.1-2001 Energy Standard for Buildings except Low-Rise Residential Buildings. These standards were developed in an effort to set minimum requirements for the energy efficient design and construction of new commercial buildings. The quantitative benefits and costs of adopting a commercial building energy code are modeled by comparing the characteristics of assumed current building practices with the most recent edition of the ASHRAE Standard, 90.1-2001. Both qualitative and quantitative benefits and costs are assessed in this analysis. Energy and economic impacts are estimated using results from a detailed building simulation tool (Building Loads Analysis and System Thermodynamics [BLAST] model) combined with a Life-Cycle Cost (LCC) approach to assess corresponding economic costs and benefits.

  20. Rural demographic change, rising wages and the restructuring of Chinese agriculture

    DEFF Research Database (Denmark)

    Li, Tianxiang; Yu, Wusheng; Baležentis, Tomas

    2017-01-01

    Purpose The purpose of this paper is to identify the effects of recent demographic transition and rising labor costs on agricultural production structure and pattern in China during 1998-2012. Design/methodology/approach The authors, first, theoretically discuss the effects of changing relative...

  1. 20 CFR 404.270 - Cost-of-living increases.

    Science.gov (United States)

    2010-04-01

    ... INSURANCE (1950- ) Computing Primary Insurance Amounts Cost-Of-Living Increases § 404.270 Cost-of-living... rises in the cost of living. These automatic increases also apply to other benefit amounts, as described...

  2. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-01-01

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups

  3. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    Energy Technology Data Exchange (ETDEWEB)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-11-26

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups.

  4. Sustainable construction: construction and demolition waste reconsidered.

    Science.gov (United States)

    del Río Merino, Mercedes; Izquierdo Gracia, Pilar; Weis Azevedo, Isabel Salto

    2010-02-01

    Construction activity in Europe has increased substantially in the past decade. Likewise, there has also been a commensurate rise in the generation of construction and demolition waste (C&DW). This, together with the fact that in many European countries the rate of recycling and reuse of C&DW is still quite low has engendered a serious environmental problem and a motivation to develop strategies and management plans to solve it. Due to its composition, there is a significant potential to reuse and/or recycle C&DW, and thereby, contribute to improving the sustainability of construction and development, but practical procedures are not yet widely known or practiced in the construction industry. This article (a) summarizes the different applications that are presently practiced to optimize the recovery and/or application of C&DW for reuse, and (b) proposes various measures and strategies to improve the processing of this waste. The authors suggest that to enhance environmental effectiveness, a conscious and comprehensive C&DW management plan should be implemented in each jurisdiction. More precisely, this study presents a holistic approach towards C&DW management, through which environmental benefits can be achieved through the application of new construction methods that can contribute to sustainable growth.

  5. Well construction team approach creates a new future for one company's operations on the Dutch Continental Shelf

    International Nuclear Information System (INIS)

    Bakker, T.W.; Stringer, R.B.

    1995-01-01

    Rising costs and low energy prices were inhibiting the development of marginal fields on the Dutch Continental Shelf, resulting in a reduction in drilling activity and a loss of business opportunities. Independent benchmark surveys and critical analysis of total well costs showed the potential for major cost reductions that could turn many of the smaller offshore gas finds into economic development prospects. This triggered a change from traditional operating and contracting strategies to a partnering approach with the principal drilling and service contractors and the institution of a well-construction team (WCT). The WCT proved so successful, with an average well cost reduction of 21% in the first year, that a similar organization has been set up for all the land drilling and workover operations. This paper describes the strategies used and presents a comparison between the traditional performance and the results from the first year of operating as a WCT. The comparison includes the results of an independent benchmark study of 20 North Sea operating companies

  6. A framework to investigate the economic growth impact of sea level rise

    International Nuclear Information System (INIS)

    Hallegatte, Stéphane

    2012-01-01

    This article reviews the channels through which sea level rise can affect economic growth, namely the loss of land, the loss of infrastructure and physical capital, the loss of social capital, the additional cost from extreme events and coastal floods, and the increased expenditure for coastal protection. It discusses how existing studies on the direct impact of sea level rise could be used to investigate the resulting consequences on economic growth, emphasizes research needs on this question, and discusses consequences on migration. (letter)

  7. Construction of a low cost wind energy generator; Construcao de um gerador de energia eolica de baixo custo

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Jonathan Penha de; Almeida, Silvio Carlos Anibal de [Universidade Federal do Rio de Janeiro (DEM/EP/UFRJ), RJ (Brazil). Escola Politecnica. Dept. de Engenharia Mecanica], Emails: jonathan_penha@poli.ufrj.br, silvioa@gmail.com

    2010-07-01

    This project presents a low cost wind electric power generator constituted of cheap and easy access materials. The necessary materials are presented for it construction and the expected efficiency, having as reference the city of Fernando de Noronha, Brazil. The elaboration of the generator was initially developed as alternative energy source during blackout.

  8. Phosphate rock costs, prices and resources interaction.

    Science.gov (United States)

    Mew, M C

    2016-01-15

    This article gives the author's views and opinions as someone who has spent his working life analyzing the international phosphate sector as an independent consultant. His career spanned two price hike events in the mid-1970's and in 2008, both of which sparked considerable popular and academic interest concerning adequacy of phosphate rock resources, the impact of rising mining costs and the ability of mankind to feed future populations. An analysis of phosphate rock production costs derived from two major industry studies performed in 1983 and 2013 shows that in nominal terms, global average cash production costs increased by 27% to $38 per tonne fob mine in the 30 year period. In real terms, the global average cost of production has fallen. Despite the lack of upward pressure from increasing costs, phosphate rock market prices have shown two major spikes in the 30 years to 2013, with periods of less volatility in between. These price spike events can be seen to be related to the escalating investment cost required by new mine capacity, and as such can be expected to be repeated in future. As such, phosphate rock price volatility is likely to have more impact on food prices than rising phosphate rock production costs. However, as mining costs rise, recycling of P will also become increasingly driven by economics rather than legislation. Copyright © 2015 Elsevier B.V. All rights reserved.

  9. A Model for Understanding the Relationship Between Transaction Costs and Acquisition Cost Breaches

    Science.gov (United States)

    2014-04-30

    an assistant professor and received a BA in anthropology and a BA and MA in economics (2004) and a PhD in political economy and public policy (2008...between transaction costs and cost overruns. Biggs (2013) showed that as the EAC SE/PM cost ratio rises there is a statistically significant corresponding...Estimate at Completion ( EAC ) is the sum of the ACWP and the estimate to completion (ETC) for the remaining work. The ETC can be calculated using the cost

  10. A Case Study of Preliminary Cost-Benefit Analysis of Building Levees to Mitigate the Joint Effects of Sea Level Rise and Storm Surge

    Directory of Open Access Journals (Sweden)

    Binbin Peng

    2018-02-01

    Full Text Available Sea-level rise (SLR will magnify the impacts of storm surge; the resulting severe flooding and inundation can cause huge damage to coastal communities. Community leaders are considering implementing adaptation strategies, typically hard engineering projects, to protect coastal assets and resources. It is important to understand the costs and benefits of the proposed project before any decision is made. To mitigate the flooding impact of joint effects of storm surge and SLR, building levee segments is chosen to be a corresponding adaptation strategy to protect the real estate assets in the study area—the City of Miami, FL, USA. This paper uses the classic Cost-Benefit Analysis (CBA to assess the cost efficiency and proposes corresponding improvements in the benefit estimation, by estimating the avoided damages of implementing levee projects. Results show that the city will benefit from implementing levee projects along the Miami River in both a one-time 10 year storm event with SLR and cumulative long-term damage scenarios. This study also suggests that conducting CBA is a critical process before making coastal adaptation planning investment. A more meaningful result of cost effectiveness is estimated by accounting for the appreciation and time value. In addition, a sensitivity analysis is conducted to verify how the choice of discount rate influences the result. Uncertain factors including the rate of SLR, storm intensification, land use changes, and real estate appreciation are further analyzed.

  11. The influence of architectural designers on construction ergonomics ...

    African Journals Online (AJOL)

    , the construction process generates a disproportionate number of fatalities, injuries and disease and both the direct and indirect costs contribute to the cumulative cost of construction. Designers influence construction ergonomics directly and ...

  12. Lateral Load-Resisting System Using Mass Timber Panel for High-Rise Buildings

    Directory of Open Access Journals (Sweden)

    Zhiyong Chen

    2017-07-01

    Full Text Available As global interest in using engineered wood products in tall buildings intensifies due to the “green” credential of wood, it is expected that more tall wood buildings will be designed and constructed in the coming years. This, however, brings new challenges to the designers. One of the major challenges is how to design lateral load-resisting systems (LLRSs with sufficient stiffness, strength, and ductility to resist strong wind and earthquakes. In this study, an LLRS using mass timber panel on a stiff podium was developed for high-rise buildings in accordance with capacity-based design principle. The LLRS comprises eight shear walls with a core in the center of the building, which was constructed with structural composite lumber and connected with dowel-type connections and wood–steel composite system. The main energy dissipating mechanism of the LLRS was detailed to be located at the panel-to-panel interface. This LLRS was implemented in the design of a hypothetical 20-storey building. A finite element (FE model of the building was developed using general-purpose FE software, ABAQUS. The wind-induced and seismic response of the building model was investigated by performing linear static and non-linear dynamic analyses. The analysis results showed that the proposed LLRS using mass timber was suitable for high-rise buildings. This study provided a valuable insight into the structural performance of LLRS constructed with mass timber panels as a viable option to steel and concrete for high-rise buildings.

  13. Low-cost hadron colliders at Fermilab: A discussion paper

    International Nuclear Information System (INIS)

    Foster, G.W.; Malamud, E.

    1996-01-01

    New more economic approaches are required to continue the dramatic exponential rise in collider energies as represented by the well known Livingston plot. The old idea of low cost, low field iron dominated magnets in a small diameter pipe may become feasible in the next decade with dramatic recent advances in technology: (1) advanced tunneling technologies for small diameter, non human accessible tunnels, (2) accurate remote guidance systems for tunnel survey and boring machine steering, (3) high T c superconductors operating at liquid N 2 or liquid H 2 temperatures, (4) industrial applications of remote manipulation and robotics, (5) digitally multiplexed electronics to minimize cables, (6) achievement of high luminosities in p-p and p-anti P colliders. The goal of this paper is to stimulate continuing discussions on approaches to this new collider and to identify critical areas needing calculations, construction of models, proof of principle experiments, and full scale prototypes in order to determine feasibility and arrive at cost estimates

  14. Comparative life cycle assessment and life cycle costing of four disposal scenarios for used polyethylene terephthalate bottles in Mauritius.

    Science.gov (United States)

    Foolmaun, Rajendra Kumar; Ramjeeawon, Toolseeram

    2012-09-01

    The annual rise in population growth coupled with the flourishing tourism industry in Mauritius has lead to a considerable increase in the amount of solid waste generated. In parallel, the disposal of non-biodegradable wastes, especially plastic packaging and plastic bottles, has also shown a steady rise. Improper disposal of used polyethylene terephthalate (PET) bottles constitutes an eyesore to the environmental landscape and is a threat to the flourishing tourism industry. It is of utmost importance, therefore, to determine a suitable disposal method for used PET bottles which is not only environmentally efficient but is also cost effective. This study investigated the environmental impacts and the cost effectiveness of four selected disposal alternatives for used PET bottles in Mauritius. The four disposal routes investigated were: 100% landfilling; 75% incineration with energy recovery and 25% landfilling; 40% flake production (partial recycling) and 60% landfilling; and 75% flake production and 25% landfilling. Environmental impacts of the disposal alternatives were determined using ISO standardized life cycle assessment (LCA) and with the support of SimaPro 7.1 software. Cost effectiveness was determined using life cycle costing (LCC). Collected data were entered into a constructed Excel-based model to calculate the different cost categories, Net present values, damage costs and payback periods. LCA and LCC results indicated that 75% flake production and 25% landfilling was the most environmentally efficient and cost-effective disposal route for used PET bottles in Mauritius.

  15. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  16. High-rise housing in the city of Samara: the first steps on the path to sustainable development

    Science.gov (United States)

    Vavilova, Tatiana Ya.; Makeeva, Elena Yu.

    2018-03-01

    This paper outlines theoretical background of high-rise housing and discusses its design experience. It particularly focuses on environmental, social and economic aspects which are among crucial sustainable development issues. The authors dwell upon the implementation of innovative solutions that meet principles and goals of sustainable development and take construction objects built in Samara (which is one of the largest metropolises in Russia) as an example. The research also investigates the quality of project designs and reveals techniques corresponding to the "green standards". It considers the issues of practicing high-rise building construction in specific urban conditions and identifies unresolved architectural problems.

  17. Modeling Anthropogenic Impact on Sediment Balance and Relative Sea-Level Rise in Contemporary and Future Deltas

    Science.gov (United States)

    Tessler, Z. D.; Vorosmarty, C. J.; Overeem, I.; Syvitski, J. P.

    2017-12-01

    Modern deltas are dependent on human-mediated freshwater and sediment fluxes. Changes to these fluxes impact delta biogeophysical functioning, and affect the long-term sustainability of these landscapes for both human and natural systems. Here we present contemporary estimates of long-term mean sediment balance and relative sea-level rise across 46 global deltas. We model ongoing development and scenarios of future water resource management and hydropower infrastructure in upstream river basins to explore how changing sediment fluxes impact relative sea-level in coastal delta systems. Model results show that contemporary sediment fluxes, anthropogenic drivers of land subsidence, and sea-level rise result in relative sea-level rise rates in deltas that average 6.8 mm/year. Currently planned or under-construction dams can be expected to increase rates of relative sea-level rise on the order of 1 mm/year. Some deltas systems, including the Magdalena, Orinoco, and Indus, are highly sensitive to future impoundment of river basins, with RSLR rates increasing up to 4 mm/year in a high-hydropower-utilization scenario. Sediment fluxes may be reduced by up to 60% in the Danube and 21% in the Ganges-Brahmaputra-Megnha if all currently planned dams are constructed. Reduced sediment retention on deltas due to increased river channelization and local flood controls increases RSLR on average by nearly 2 mm/year. Long-term delta sustainability requires a more complete understanding of how geophysical and anthropogenic change impact delta geomorphology. Strategies for sustainable delta management that focus on local and regional drivers of change, especially groundwater and hydrocarbon extraction and upstream dam construction, can be highly impactful even in the context of global climate-induced sea-level rise.

  18. The effect of economic growth, oil prices, and the benefits of reactor standardization: Duration of nuclear power plant construction revisited

    International Nuclear Information System (INIS)

    Csereklyei, Zsuzsanna; Thurner, Paul W.; Bauer, Alexander; Küchenhoff, Helmut

    2016-01-01

    The profitability of nuclear power plant investment is largely determined by the construction duration, which directly impacts discounted cash flows, debt and interest payments, as well as variable costs, such as labor. This paper analyzes the key drivers of construction duration using survival models. We focus especially on the strategic expectation formation of private and public utilities engaging in such highly risky megaprojects. Using a balanced dataset of explanatory variables and the IAEA/PRIS dataset of reactor construction starts between 1950 and 2013 we find that the expectation of rising oil prices and higher economic growth, along with the higher per capita GDP of a country tend to reduce the time needed to grid connection. We also identify the reactor models with the fastest construction duration. - Highlights: • We find that higher future economic growth speeds up nuclear reactor construction. • Higher national capacity (measured by income per capita) results in faster projects. • Higher oil prices during construction lead to faster construction times. • Reactor standardization may result in faster building times.

  19. FFTF constructibility

    International Nuclear Information System (INIS)

    Weber, S.A.; Hulbert, D.I.

    1975-01-01

    The influence of the design criteria on the constructibility of the Fast Flux Test Facility is described. Specifically, the effects of requirements due to maintenance accessibility, inerting of cells, seismicity, codes, and standards are addressed. The design and construction techniques developed to minimize the impact of the design criteria on cost and schedule are presented with particular emphasis on the cleanliness and humidity controls imposed during construction of the sodium systems. (U.S.)

  20. Reprocessing costs more stable soon

    International Nuclear Information System (INIS)

    Messer, K.P.

    1985-01-01

    The period of steep rises in costs of the fuel circuit seems to be ending. The prospects for a stabilization of the market in the next few years are favourable. This favourable expectation is supported by the analysis of the nuclear fuel circuit costs. (orig.) [de

  1. The Impact of a Suicide Prevention Strategy on Reducing the Economic Cost of Suicide in the New South Wales Construction Industry.

    Science.gov (United States)

    Doran, Christopher M; Ling, Rod; Gullestrup, Jorgen; Swannell, Sarah; Milner, Allison

    2016-03-01

    Little research has been conducted into the cost and prevention of self-harm in the workplace. To quantify the economic cost of self-harm and suicide among New South Wales (NSW) construction industry (CI) workers and to examine the potential economic impact of implementing Mates in Construction (MIC). Direct and indirect costs were estimated. Effectiveness was measured using the relative risk ratio (RRR). In Queensland (QLD), relative suicide risks were estimated for 5-year periods before and after the commencement of MIC. For NSW, the difference between the expected (i.e., using NSW pre-MIC [2008-2012] suicide risk) and counterfactual suicide cases (i.e., applying QLD RRR) provided an estimate of potential suicide cases averted in the post-MIC period (2013-2017). Results were adjusted using the average uptake (i.e., 9.4%) of MIC activities in QLD. Economic savings from averted cases were compared with the cost of implementing MIC. The cost of self-harm and suicide in the NSW CI was AU $527 million in 2010. MIC could potentially avert 0.4 suicides, 1.01 full incapacity cases, and 4.92 short absences, generating annual savings of AU $3.66 million. For every AU $1 invested, the economic return is approximately AU $4.6. MIC represents a positive economic investment in workplace safety.

  2. Single-point reactive power control method on voltage rise mitigation in residential networks with high PV penetration

    DEFF Research Database (Denmark)

    Hasheminamin, Maryam; Agelidis, Vassilios; Ahmadi, Abdollah

    2018-01-01

    Voltage rise (VR) due to reverse power flow is an important obstacle for high integration of Photovoltaic (PV) into residential networks. This paper introduces and elaborates a novel methodology of an index-based single-point-reactive power-control (SPRPC) methodology to mitigate voltage rise by ...... system with high r/x ratio. Efficacy, effectiveness and cost study of SPRPC is compared to droop control to evaluate its advantages.......Voltage rise (VR) due to reverse power flow is an important obstacle for high integration of Photovoltaic (PV) into residential networks. This paper introduces and elaborates a novel methodology of an index-based single-point-reactive power-control (SPRPC) methodology to mitigate voltage rise...... by absorbing adequate reactive power from one selected point. The proposed index utilizes short circuit analysis to select the best point to apply this Volt/Var control method. SPRPC is supported technically and financially by distribution network operator that makes it cost effective, simple and efficient...

  3. Feasibility study tool for semi-rigid joints design of high-rise buildings steel structures

    Science.gov (United States)

    Bagautdinov, Ruslan; Monastireva, Daria; Bodak, Irina; Potapova, Irina

    2018-03-01

    There are many ways to consider the final cost of the high-rise building structures and to define, which of their different variations are the most effective from different points of view. The research of Jaakko Haapio is conducted in Tampere University of Technology, which aims to develop a method that allows determining the manufacturing and installation costs of steel structures already at the tender phase while taking into account their details. This paper is aimed to make the analysis of the Feature-Based Costing Method for skeletal steel structures proposed by Jaakko Haapio. The most appropriate ways to improve the tool and to implement it in the Russian circumstances for high-rise building design are derived. Presented tool can be useful not only for the designers but, also, for the steel structures manufacturing organizations, which can help to utilize BIM technologies in the organization process and controlling on the factory.

  4. International Construction Measurement Standard

    OpenAIRE

    Mitchell, Charles

    2016-01-01

    The International Construction Measurement Standard Coalition (the Coalition) was formed on 17 June 2015 after meeting at the International Monetary Fund in Washington DC, USA. The Coalition, comprising the organisations listed below at the date of publication, aims to bring about consistency in construction cost reporting standards internationally. This is achieved by the creation and adoption of this ICMS, an agreed international standard for the structuring and presentation of cost reports...

  5. Installation of ventilated facades without scaffolding in high-rise buildings

    Science.gov (United States)

    Gnedina, Lyubov; Muchkina, Arina; Labutin, Alexander

    2018-03-01

    This article consider the use of polystyrene concrete blocks during assembling enclosing structure of ventilated facades in high-rise monolithic housing construction. Comparing with traditional technology devices hinged ventilated facade the main advantage of the proposed design is an exception of using scaffold, that leads to a cheapening of the enclosing structure. Proposed solutions are confirmed by patents of the Russian Federation.

  6. Let the bleeding begin: rising costs are starting to crush oilpatch profits

    International Nuclear Information System (INIS)

    Koch, G.

    1997-01-01

    Reasons for the increase in the cost and decrease in profits in the oil industry were investigated. The most likely cause for the cost increase and hence the diminishing profit margin, was identified as a simple supply and demand increase in the cost of exploration and drilling: seismic crews, drilling rigs, well servicing and labour have all increased by an average of some 10 per cent as a result of the heavy demand for these services to support the growth that companies seek. Concentrated ownership in the drilling sector is partially to blame. A severe shortage of skilled labour, and an increase in land prices are some of the other possible causes. While some industry observers expect the worst, others are confident that gradually falling profits will prompt a market correction. The tightening of investment capital will slow down rates of drilling and land acquisition, gradually easing prices downward. Volume contracting ahead of time, booking seismic crews and rigs for an entire season at a fixed cost, and technological improvements also offer hope of forcing costs down. Heavy investment by industry majors in new oilsands and heavy oil developments is yet another promise of maintaining profit margins in the oil patch while reducing the industry''s reliance on conventional light crude

  7. Analysis of selected factors that generate the costs of accidents at work using the Polish construction industry as an example

    Directory of Open Access Journals (Sweden)

    Hoła Anna

    2016-01-01

    Full Text Available The paper presents analysis of selected factors that generate the costs of accidents at work using the Polish construction industry as an example. The individual components of the cost of accidents have been identified. Using the statistical data published by the Central Statistical Office, the impact on the size of the cost of accidents at work of such factors as the lost time of an injured person, the lost time of other people involved in the removal of accident effects and also material losses caused by an accident, was analysed. On the basis of the conducted analysis, conclusions regarding economic losses due to accidents were formulated.

  8. Modelo PEF de costes de la calidad como herramienta de gestión en empresas constructoras: una visión actual Quality costs PEF model as a management tool in construction firms: a present vision

    Directory of Open Access Journals (Sweden)

    Santos Gracia Villar

    2007-04-01

    Full Text Available Los costes de la calidad representan una herramienta de planificación de la calidad, que permite la medición de la mejora continua. Se realizó una revisión bibliográfica y discusión de las publicaciones actuales sobre los modelos genéricos de costes de la calidad. Se observó que el modelo genérico empleado con mayor frecuencia, sigue siendo el enfoque tradicional PEF (prevención, evaluación y fallos. De esta manera, se plantea este modelo en el contexto de las empresas constructoras, como herramienta de gestión de la calidad, destacando la forma en que la gestión eficaz de estos, puede reflejarse en las utilidades y productividad de dicha empresa. De igual manera, se sugiere que los costes de la calidad pueden calcularse y ser expresados en forma contable, proporcionando un parámetro en el que podemos decidir sobre los beneficios que trae su control. El objetivo de un sistema de costes de la calidad es encontrar el nivel de calidad requerido para minimizar los costes de la calidad totales, esto dará la seguridad que dicha empresa constructora esta funcionando de manera óptima con relación a sus procesos y productosThe quality costs are a quality management tool to measure the continual improvement. It was made a bibliographical revision and discussion of present publications on the generic models of quality costs. It was observed that the most frequently used generic model, continues being traditional approach PAF (prevention, appraisal and failures. So, this model was established in a construction firm context as a quality management tool, pointing out the form in that the effective management of these can be reflected in the utilities and productivity of a construction firm. Also, is suggested that quality costs can be calculated and be recorded in a countable form, providing a parameter to decide on the benefits that its control brings. The objective of a quality costs system is to find the level of quality that minimizes

  9. Costing Practices in Healthcare

    DEFF Research Database (Denmark)

    Chapman, Christopher; Kern, Anja; Laguecir, Aziza

    2014-01-01

    .e., Diagnosis Related Group (DRG) systems, and costing practices. DRG-based payment systems strongly influence costing practices in multiple ways. In particular, setting DRG tariffs requires highly standardized costing practices linked with specific skill sets from management accountants and brings other...... jurisdictions (e.g., clinical coding) to bear on costing practice. These factors contribute to the fragmentation of the jurisdiction of management accounting.......The rising cost of healthcare is a globally pressing concern. This makes detailed attention to the way in which costing is carried out of central importance. This article offers a framework for considering the interdependencies between a dominant element of the contemporary healthcare context, i...

  10. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    OpenAIRE

    Ngah Nasaruddin Nur Ain; Abdul Rahman Ismail

    2016-01-01

    Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. ...

  11. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  12. The comparison of properties and cost of material use of natural rubber and sand in manufacturing cement mortar for construction sub-base layer

    Science.gov (United States)

    Rahman, R.; Nemmang, M. S.; Hazurina, Nor; Shahidan, S.; Khairul Tajuddin Jemain, Raden; Abdullah, M. E.; Hassan, M. F.

    2017-11-01

    The main issue related to this research was to examine the feasibility of natural rubber SMR 20 in the manufacturing of cement mortar for sub-base layer construction. Subbase layers have certain functions that need to be fulfilled in order to assure strong and adequate permeability of pavement performance. In a pavement structure, sub-base is below the base and serves as the foundation for the overall pavement structure, transmitting traffic loads to the sub-grade and providing drainage. Based on this research, the natural rubber, SMR 20 was with the percentages of 0%, 5%, 10% and 15% to mix with sand in the manufacture of the cement mortar. This research describes some of the properties and cost of the materials for the natural rubber and sand in cement mortar manufacturing by laboratory testing. Effects of the natural rubber replacement on mechanical properties of mortar were investigated by laboratory testing such as compressive strength test and density. This study obtained the 5% of natural rubber replaced in sand can achieved the strength of normal mortar after 7 days and 28 days. The strength of cement mortar depends on the density of cement mortar. According to the cost of both materials, sand shows the lower cost in material for the cement mortar manufacturing than the uses of natural rubber. Thus, the convectional cement mortar which used sand need lower cost than the modified rubber cement mortar and the most economical to apply in industrial. As conclusion, the percentage of 5% natural rubber in the cement mortar would have the same with normal cement mortar in terms of the strength. However, in terms of the cost of the construction, it will increase higher than cost of normal cement mortar production. So that, this modified cement mortar is not economical for the road sub-base construction.

  13. Labor construction trends

    International Nuclear Information System (INIS)

    McCall, H.W.

    1976-01-01

    The increasing costs and schedule delays being experienced in construction projects have led companies to look for alternatives to their present methods of expansion. One of the facets being evaluated is the construction labor posture. As a result, more companies are employing open shop contractors. Certain benefits can be realized by open shop construction. Productivity, in terms of the time required and overall costs, is definitely improved at no sacrifice in quality. Before an owner decides to build a project open shop, however, he must be fully aware of the pro's and con's of both types of labor posture. He must know to select a capable open shop contractor and he must realize his obligations for a successful open shop program

  14. Nuclear plant construction and investment risk

    International Nuclear Information System (INIS)

    Studness, C.M.

    1984-01-01

    Escalated cost estimations, delays and cancellations in nuclear construction have caused a preoccupation with the risks of nuclear power plant construction that dominates utility stock investment, overshadowing increased earnings per share and recent growth in production. The issue will be resolved when increased power demand requires new construction, but the effect has so far been to erode the economic advantage of nuclear power and threaten the ability of utilities to get rate increases high enough to cover their costs. Projected delays and cost escalations and their effects must go into an economic appraisal of the investment risks

  15. Candidate constructional volcanic edifices on Mercury

    OpenAIRE

    Wright, J.; Rothery, D. A.; Balme, M. R.; Conway, S. J.

    2018-01-01

    [Introduction] Studies using MESSENGER data suggest that Mercury’s crust is predominantly a product of effusive volcanism that occurred in the first billion years following the planet’s formation. Despite this planet-wide effusive volcanism, no constructional volcanic edifices, characterized by a topographic rise, have hitherto been robustly identified on Mercury, whereas constructional volcanoes are common on other planetary bodies in the solar system with volcanic histories. Here, we descri...

  16. Rising sea levels and small island states

    International Nuclear Information System (INIS)

    Leatherman, S.P.

    1994-01-01

    A review is given of the problems small island nations face with respect to sea level rise caused by global warming. Many small island nations are very vulnerable to sea level rise. Particularly at risk are coral reef atolls, which are generally quite small, lie within three metres of current sea levels, and have no land at higher elevations to relocate populations and economic activity. Volcanic islands in the Pacific have high ground, but it is largely rugged, high relief and soil-poor. The most vulnerable islands are those that consist entirely of atolls and reef islands, such as Kirabai, Maldives, Tokelau and Tuvalu. Small island states, which by themselves have little power or influence in world affairs, have banded together to form the Strategic Alliance of Small Island States (AOSIS). This alliance had grown to include 42 states by the time of the 1992 U.N. Earth Summit. Although the greenhouse effect is mainly caused by industrial nations, developing countries will suffer the most from it. Choices of response strategy will depend on environmental, economic and social factors. Most small island nations do not have the resources to fight sea level rise in the way that the Dutch have. Retreat can occur as a gradual process or as catastrophic abandonment. Prohibiting construction close to the water's edge is a good approach. Sea level histories for each island state should be compiled and updated, island geomorphology and settlement patterns should be surveyed to determine risk areas, storm regimes should be determined, and information on coastal impacts of sea level rise should be disseminated to the public

  17. Application research of cost construction on radioactive waste management

    International Nuclear Information System (INIS)

    Gao Yanfeng; Bi Sheng; Liu Zhenhe

    2009-01-01

    This paper summarizes the theoretical basis systems for the cost component on radioactive waste management. Through the decomposition production of various types of project content, analysis of the cost elements of operating activities, study subjects at reason-able cost and expense. On the basis of the formation of radioactive waste management costs of the various operating structure Into, and established a comprehensive system of price system. (authors)

  18. High-rise housing in the city of Samara: the first steps on the path to sustainable development

    Directory of Open Access Journals (Sweden)

    Vavilova Tatiana Ya.

    2018-01-01

    Full Text Available This paper outlines theoretical background of high-rise housing and discusses its design experience. It particularly focuses on environmental, social and economic aspects which are among crucial sustainable development issues. The authors dwell upon the implementation of innovative solutions that meet principles and goals of sustainable development and take construction objects built in Samara (which is one of the largest metropolises in Russia as an example. The research also investigates the quality of project designs and reveals techniques corresponding to the "green standards". It considers the issues of practicing high-rise building construction in specific urban conditions and identifies unresolved architectural problems.

  19. Construction Management Meets Today's Realities.

    Science.gov (United States)

    Day, C. William

    1979-01-01

    Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)

  20. A Nonlinear Multiobjective Bilevel Model for Minimum Cost Network Flow Problem in a Large-Scale Construction Project

    Directory of Open Access Journals (Sweden)

    Jiuping Xu

    2012-01-01

    Full Text Available The aim of this study is to deal with a minimum cost network flow problem (MCNFP in a large-scale construction project using a nonlinear multiobjective bilevel model with birandom variables. The main target of the upper level is to minimize both direct and transportation time costs. The target of the lower level is to minimize transportation costs. After an analysis of the birandom variables, an expectation multiobjective bilevel programming model with chance constraints is formulated to incorporate decision makers’ preferences. To solve the identified special conditions, an equivalent crisp model is proposed with an additional multiobjective bilevel particle swarm optimization (MOBLPSO developed to solve the model. The Shuibuya Hydropower Project is used as a real-world example to verify the proposed approach. Results and analysis are presented to highlight the performances of the MOBLPSO, which is very effective and efficient compared to a genetic algorithm and a simulated annealing algorithm.