WorldWideScience

Sample records for riser integrity management

  1. Flexible riser integrity management: areas of concern and applications

    Energy Technology Data Exchange (ETDEWEB)

    Podskarbi, Mateusz [Schlumberger Servicos de Petroleo Ltda., Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Flexible risers are key enables for both deep water and shallow water offshore production developments. Number of flexible risers installed worldwide is into several thousands with two main concentration areas - offshore Brazil and North Sea. Flexible risers are subject to significant loads including environmental impacts, vessel motions, internal temperature and pressure as well as substantial installation loads. Excessive loads of one type or a combination of various types of loads can cause damage to the flexible that can lead to a catastrophic failure. Industry observed number of failures increasing in recent years. Operators and manufacturing companies are taking various steps to address this issue. One of possible approaches is to use monitoring instrumentation to measure riser response and integrity in real time. This paper reviews various types of flexible riser damage mechanisms caused by impact damage, corrosion, excessive pressure, armor wire rupture, compromising flexible riser minimum bend radius, excessive fatigue loading, etc. Failure mechanisms are reviewed with particular focus on the consequences that it causes in terms of risk to the infrastructure and detectable changes. Further part of the paper is focused on monitoring techniques employed and available to detect particular types of failure mechanisms. Systematic review of the monitoring techniques is provided with specific attention given to ability of these techniques to provide early warnings of riser failure. Evaluation of monitoring techniques versus modes of operation and failure mechanism is key to selecting appropriate system that ensures effectiveness of the integrity management program. (author)

  2. Dalia integrated production bundle (IPB): an innovative riser solution for deep water fields

    Energy Technology Data Exchange (ETDEWEB)

    Reals, Th Boscals de; Gloaguen, M.; Roche, F. [Total E and P (Angola); Marion, A.; Poincheval, A. [Technip, Paris (France)

    2008-07-01

    The Dalia field is located 210 km north west of Luanda (Angola), about 140 km from shore in 1400 meter water-depth. It was the second major discovery out of 15 made in the block 17 operated by Total. The Dalia Umbilical, Flow lines and Risers EPCI Contract was awarded in 2003. The sea-line network to connect and control the 71 wells and 9 manifolds consist of the following: 40 km of insulated pipe in pipe (12 inches into 17 inches) production flow lines; 45 km of 12 inches water and gas injection lines; 6 off 1.7 km flexible water and gas injection risers; 8 off 1.65 km flexible Integrated Production Bundle (IPB) risers; 75 km of control umbilicals. The flow assurance and associated insulation requirement of the production transport system was one of the main challenges of the project. With a crude temperature of 45 deg C at the wellhead and the required minimum temperature of 35 deg C on arrival at the FPSO, this problem was complex. Understanding that, due to the Joule Thompson effect of the riser gas lift, a 'built in' loss of about 5 deg C is induced and together with further losses through the sub sea pipelines, some up to 6 km long, the agreed solution was 'pipe in pipe' for the production flow lines. The innovative flexible IPB riser, incorporating gas lift and heating to keep the fluid temperature above hydrate formation zone, was the selected riser solution. The IPB is new technology for deep water, developed by Technip for Dalia, and consists of a 12 inches nominal central flexible, surrounded by layers of heat tracing cables, small bore gas lift lines, optical fibres and many insulation layers with an Overall Heat Transfer Coefficient of approximately 3,4 W/m{sup 2}K. After an earlier research and development programme, a further extensive qualification programme was conducted during the course of the project, culminating with the deep water testing phase offshore Brazil. The IPB was then approved for fabrication and installation

  3. Advances in riser and pipeline technologies

    Energy Technology Data Exchange (ETDEWEB)

    Kan, Wan C.; Mortazavi, Mehrdad; Weir, Michael S. [ExxonMobil Development Company, Dallas, TX (United States)

    2009-12-19

    As oil and gas production continues to move into new frontier areas, novel applications of the existing riser and pipeline technologies need to be developed to meet the often more stringent requirements encountered in these environments. The challenges include ultra deep water, harsh environments, aggressive fluid conditions, and local content objectives, etc. They will require industry to constantly extend, expand, and enhance the broad range of solution options. Also, the existing design criteria in industry may need to be revised or new criteria may need to be developed to satisfy these needs. Exxon Mobil (Em) employs, and works with others in industry to promote robust design and operating practices. This approach requires in-depth understanding, sound engineering principles, advanced analysis, uncertainty management, and supportive qualification test data. It enables confident selection, extrapolation, and innovation of technologies to address new riser system and pipeline challenges. Focus on fundamental is imperative to ensure integrity of the selected systems during fabrication, installation, and operation phases. Recent and past project experience in deep water Gulf of Mexico and West Africa provides many successful examples of this approach. This paper reviews several examples of the key riser system and pipeline technology enhancements recently achieved by EM to provide confidence in addressing technical and project application challenges. Riser system technology enhancements addressed in this paper include steel catenary riser (SCR) application on turret-moored FPSO with severe motions, pipe-in-pipe (PIP) hybrid production riser to effectively manage gas lift and flow assurance requirements, irregular wave analysis methodology for flexible risers and umbilicals to reduce conservatism, and qualification of riser and pipeline VIV prediction and mitigation methods. Pipeline technology enhancements detailed in this paper include lateral buckling prediction

  4. Identifying and evaluating high risk areas and challenges on marine drilling riser system in relation to deepwater problems

    OpenAIRE

    Iversen, Alexander

    2012-01-01

    Master's thesis in Offshore technology The main concerns during drilling operations are riser integrity and maintaining well control. This thesis has mainly been focusing on the problems and challenges faced with the marine riser system to illuminate high risk areas related to riser integrity. A marine riser system consists generally of four main elements; the upper marine riser package, riser joints, lower marine riser package, and the blowout preventer, each playing an important par...

  5. Inspection and monitoring techniques for un-bonded flexible risers and pipelines

    OpenAIRE

    Simonsen, Anders

    2014-01-01

    Master's thesis in Offshore technology Un-bonded flexible pipelines and risers are an alternative to conventional rigid steel pipes. The use of flexible pipes has enabled development of several offshore fields that seemed unfeasible with the use of rigid pipes due to extensive seabed preparation and large dynamic motions. The lack of knowledge and integrity management tools for flexible pipes is a limiting factor and cause pipelines and risers to be replaced before their service life has ...

  6. Most recent developments for monitoring and controlling the annulus conditions of Marlim-Sul flexible risers

    Energy Technology Data Exchange (ETDEWEB)

    Rabelo, Alexandre S.; Motta, Antonio; Romero, Antonio; Nunes, Joao P.; Zaganelli Junior, Jose L.; Brack, Marcelo [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The main objective of this paper is to present the recent developments for monitoring and controlling the annulus conditions of flexible risers. PETROBRAS has been monitoring the pressure of permeated gas in the annulus region of some risers in order to infer the eventual occurrence of non-conformities as damage on the riser external sheath, for example. Such occurrence would affect the permeated gas flow pattern, the gas pressurization period and the relief valve opening frequencies. Furthermore, the mentioned occurrence would increase the susceptibility of the steel armors to experience the potential failure mechanism of corrosion. In PETROBRAS, the current monitoring method is characterized by visual and periodic manometer readings from a manometer set installed near each riser end-fitting. The data is recorded in a daily report and analyzed by personnel onshore, who are in charge of comparing data and requesting relief valve's actuation, whenever necessary. The paper illustrates Marlim-Sul Asset experience on monitoring and data processing to control the annulus conditions of flexible risers during operation. It presents the in-house developed methodology to data management and processing. This methodology is based on a daily analysis of the permeated gas data worksheet. Some examples are given to illustrate it. The paper also summarizes current developments, in progress, in order to improve riser integrity management. The first development is being done to implement, in the future, automatic data acquisition and control systems. The purpose of automating this process is to improve methods and techniques for data acquisition, transmission and processing. The second development focuses on applications in which riser top end-fittings are submerged. In this particular scenario, a special system - with a quick connection sub sea device - is under development to allow the connection, by divers, after the riser pull-in, of the riser annulus to the platform gas

  7. Riser pipe elevator

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, W.; Jimenez, A.F.

    1987-09-08

    This patent describes a method for storing and retrieving a riser pipe, comprising the steps of: providing an upright annular magazine comprised of an inside annular wall and an outside annular wall, the magazine having an open top; storing the riser pipe in a substantially vertically oriented position within the annular magazine; and moving the riser pipe upwardly through the open top of the annular magazine at an angle to the vertical along at least a portion of the length of the riser pipe.

  8. Continuous composite riser

    Energy Technology Data Exchange (ETDEWEB)

    Slagsvold, L. [ABB Offshore Systems (Norway)

    2002-12-01

    The industry is now looking at developing reserves in waters depths of up to 3000 m (10000 ft). When moving into deeper waters the un-bonded flexible riser becomes very heavy and introduces large hang-off forces on the vessel. We are therefore investigating riser concepts incorporating new materials and with a simpler cross section that can be used for floating production. Advanced composite materials have properties such as, low weight, high strength, good durability and very good fatigue performance. Composite materials are slowly being exploited in the oil industry; they are being prototype tested for drilling risers and small diameter lines. Part of the process for the industry to accept larger diameter production risers made out of composite materials is to understand both the advantages and limitations. A new continuous composite riser system is being developed which capitalizes on the technical benefits of this material while addressing the known constraints. The fully bonded riser is being developed for ultra deep waters and its' characteristics include high temperature (160 deg C), high pressure (500 barg min), light weight, chemical resistant, good insulation, excellent fatigue characteristics and installation by reeling. The concept is based on the use of a thermoplastic liner together with a thermoplastic carbon fibre composite. This paper summarises the ongoing development, which has a goal to manufacture and qualify an 8'' riser, and includes all the steps in a production process from material qualification to the winding process and analytical modelling. (author)

  9. Engineering Task Plan for simulated riser installation by use of rotary drilling

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1995-12-01

    This task is being performed to demonstrate the feasibility of the best riser installation alternative identified in the Engineering Study. This Engineering Task Plan (ETP) will be the WHC project management plan for the riser installation demonstration activities

  10. 1000 meters water depth rigid TLP riser; Riser rigido de plataforma de pernas atirantadas para lamina d'agua de 1000 metros

    Energy Technology Data Exchange (ETDEWEB)

    Braga, Mauro Jacinto Pastor

    1990-07-01

    A procedure to estimate the fatigue life of a TLP riser in 1000 meters water depth based on a hydro-elastic analysis of an integrated riser-TLP model in the time domain is presented . The computational architecture is shown that makes it feasible to process and store the great amount of data involved. The procedure is applied to a 1000 meters water depth TLP with a set of 40 risers 8 inches in diameter equipped with a floatation layer. (author)

  11. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  12. Integrated nursery pest management

    Science.gov (United States)

    R. Kasten Dumroese

    2012-01-01

    What is integrated pest management? Take a look at the definition of each word to better understand the concept. Two of the words (integrated and management) are relatively straightforward. Integrated means to blend pieces or concepts into a unified whole, and management is the wise use of techniques to successfully accomplish a desired outcome. A pest is any biotic (...

  13. Numerical Modeling and Mechanical Analysis of Flexible Risers

    Directory of Open Access Journals (Sweden)

    J. Y. Li

    2015-01-01

    Full Text Available ABAQUS is used to create a detailed finite element model for a 10-layer unbonded flexible riser to simulate the riser’s mechanical behavior under three load conditions: tension force and internal and external pressure. It presents a technique to create detailed finite element model and to analyze flexible risers. In FEM model, all layers are modeled separately with contact interfaces; interaction between steel trips in certain layers has been considered as well. FEM model considering contact interaction, geometric nonlinearity, and friction has been employed to accurately simulate the structural behavior of riser. The model includes the main features of the riser geometry with very little simplifying assumptions. The model was solved using a fully explicit time-integration scheme implemented in a parallel environment on an eight-processor cluster and 24 G memory computer. There is a very good agreement obtained from numerical and analytical comparisons, which validates the use of numerical model here. The results from the numerical simulation show that the numerical model takes into account various details of the riser. It has been shown that the detailed finite element model can be used to predict riser’s mechanics behavior under various load cases and bound conditions.

  14. Pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Guyt, J.; Macara, C.

    1997-12-31

    This paper focuses on some of the issues necessary for pipeline operators to consider when addressing the challenge of managing the integrity of their systems. Topics are: Definition; business justification; creation and safeguarding of technical integrity; control and deviation from technical integrity; pipelines; pipeline failure assessment; pipeline integrity assessment; leak detection; emergency response. 6 figs., 3 tabs.

  15. Monitoring system of depressurization valves of migrated gas in annular space of flexible risers

    Energy Technology Data Exchange (ETDEWEB)

    Mesquita, Luiz A.; Santos, Joilson M.; Carvalho, Antonio L.; Loureiro, Patricia [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    PETROBRAS Research and Development Center - CENPES developed an automatic system for monitoring pressure of annular space due to permeation of gas in flexible risers to inspect continuously integrity of such lines. To help maintaining physical integrity of flexible risers, two PSV's are installed to end fittings on top of riser, so that operation of any valve grants the maximum admissible gas pressure within the riser annular space, as overpressure might cause damages to external polymeric layer of flexible riser. Due to the fact that there is no mechanism allowing operation to verify correct PSV performance and frequency of valve's closings and openings, we felt to be necessary the development and implement an automatic instrumented system, integrated to platform's automation and control infrastructure. The objective of this instrumentation is to monitor and register pressure of annular space in flexible riser, as well as XV's depressurization frequency. Having such information registered and monitored, can infer some riser structural conditions, anticipating repairs and preventive maintenance. In this paper we present developed system details including instruments required, application, operation of associated screens that are used in the ECOS, with events, alarms and industrial automation services required (Application development and system integration). (author)

  16. The Sleipner riser platform experience

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The article discusses briefly the Norwegian Sleipner riser project. The project has provided new insight on how to handle smaller development projects in a time saving and cost effective way. Through active cooperation between the prime contractors, the total project time, which included engineering, fabrication ready to tow, was slashed to a record 11 months. Normally, such a project would take a couple of years to complete. 1 fig

  17. Steel catenary risers supported by subsurface buoy

    OpenAIRE

    Adebayo, Addayo

    2011-01-01

    Master's thesis in Offshore technology Oil and gas exploration and production activities in deep and ultra deep waters in hostile environments necessitates the need to develop innovative riser systems capable of ensuring transfer of fluids from the seabed to a floating vessel and vice versa, with little or no issues with respect to influences of environmental loads and vessel motions. Over the years, studies have shown that the conventional flexible riser and steel catenary riser config...

  18. Managing for Organizational Integrity.

    Science.gov (United States)

    Paine, Lynn Sharp

    1994-01-01

    Compliance-based ethics programs focus on prevention, detection, and punishment. Companies should adopt an integrity-based approach to ethics management that combines a concern for the law with an emphasis on managerial responsibility for ethical behavior. (JOW)

  19. Integrated Health Management Definitions

    Data.gov (United States)

    National Aeronautics and Space Administration — The Joint Army Navy NASA Air Force Modeling and Simulation Subcommittee's Integrated Health Management panel was started about 6 years ago to help foster...

  20. Reliable Radiographic Inspection of Flexible Risers for the Oil Industry

    Science.gov (United States)

    Almeida, Rômulo M.; Rebello, Joao Marcos A.; Vaz, Murilo A.

    2010-02-01

    Flexible risers are composite tubular structures manufactured by the concentric assemblage of cylindrical polymeric and helically wound metallic layers employed to convey pressurized fluids such as oil, gas and water in the ocean environment. The metallic layers account for the flexible risers' structural strength and are dimensioned according to the static and dynamic loads. They are usually installed in a free hanging catenary configuration and are subjected to the direct action of waves and marine currents and wave induced motions from the oil production platform. The fatigue rupture of wire armours in the end fitting or within the riser segment protected by the bend stiffener is an object of major concern. Integrity models have been developed, however inspection techniques are mandatory to ensure that failure is detected. Gammagraphy has been used as a common inspection technique in all regions of the flexible riser, mainly with the single wall-single view method. On the other side, there is not any qualified radiographic procedure to this kind of structure. Radiographic simulation was adopted and its validation with actual gammagraphies and establishment of radiographic parameters to complex radiation geometries were done. Results show the viability of the radiographic inspection analyzing the armour wires' rupture and the displacement between wires.

  1. RELIABLE RADIOGRAPHIC INSPECTION OF FLEXIBLE RISERS FOR THE OIL INDUSTRY

    International Nuclear Information System (INIS)

    Almeida, Romulo M.; Rebello, Joao Marcos A.; Vaz, Murilo A.

    2010-01-01

    Flexible risers are composite tubular structures manufactured by the concentric assemblage of cylindrical polymeric and helically wound metallic layers employed to convey pressurized fluids such as oil, gas and water in the ocean environment. The metallic layers account for the flexible risers' structural strength and are dimensioned according to the static and dynamic loads. They are usually installed in a free hanging catenary configuration and are subjected to the direct action of waves and marine currents and wave induced motions from the oil production platform. The fatigue rupture of wire armours in the end fitting or within the riser segment protected by the bend stiffener is an object of major concern. Integrity models have been developed, however inspection techniques are mandatory to ensure that failure is detected. Gammagraphy has been used as a common inspection technique in all regions of the flexible riser, mainly with the single wall-single view method. On the other side, there is not any qualified radiographic procedure to this kind of structure. Radiographic simulation was adopted and its validation with actual gammagraphies and establishment of radiographic parameters to complex radiation geometries were done. Results show the viability of the radiographic inspection analyzing the armour wires' rupture and the displacement between wires.

  2. Integrated crisis management exercises

    International Nuclear Information System (INIS)

    Callen, R.B.; DeHart, R.E.

    1994-01-01

    This paper describes some of the steps that Mobil has taken to enhance their crisis management capability and to improve their readiness. The approach stretches from the individual plant level to Mobil's Corporate offices in Fairfax, Virginia. Some of the lessons learned from several integrated crisis management exercises are outlined and some areas where additional industry co-operation in crisis management could pay dividends are suggested

  3. The impact of a grain of sand: increasing production speed in flexible risers generates significant savings in gas production

    NARCIS (Netherlands)

    Bokhorst, E. van; Blokland, H.

    2012-01-01

    Deep-sea oil and gas production normally involves the use of flexible risers that comprise a metal carcass with a large number of enveloping layers that safeguard the integrity of the pipe system. The flexible risers are hung from a floating platform and may be supported by several floating buoys to

  4. Prevention of pulsations caused by flexible risers

    NARCIS (Netherlands)

    Belfroid S.P.C; Golliard, J.; Korst, H.J.C.

    2013-01-01

    In the last few decades, flexible risers have increasingly been used in the offshore oil and gas industry. In gas applications these risers can generate high amplitude tonal pressure fluctuations when the gas velocity reaches a threshold value. The resulting pressure fluctuations can then cause high

  5. Integrated management systems

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Remmen, Arne; Mellado, M. Dolores

    2006-01-01

    Different approaches to integration of management systems (ISO 9001, ISO 14001, OHSAS 18001 and SA 8000) with various levels of ambition have emerged. The tendency of increased compatibility between these standards has paved the road for discussions of, how to understand the different aspects of ...

  6. Integrated Pest Management (IPM)

    Science.gov (United States)

    Repellents Rodenticides Other types of pesticides Disponible en español Integrated Pest Management (IPM) IPM Company: IPM is the Key - Oregon State University Extension Service Last updated May 11, 2018 Related Insecticides Natural and Biological Pesticides Repellents Rodenticides Other types of pesticides Disponible en

  7. Magnetic non-destructive evaluation of ruptures of tensile armor in oil risers

    International Nuclear Information System (INIS)

    Pérez-Benitez, J A; Padovese, L R

    2012-01-01

    Risers are flexible multilayered pipes formed by an inner flexible metal structure surrounded by polymer layers and spiral wound steel ligaments, also known as armor wires. Since these risers are used to link subsea pipelines to floating oil and gas production installations, and their failure could produce catastrophic consequences, some methods have been proposed to monitor the armor integrity. However, until now there is no practical method that allows the automatic non-destructive detection of individual armor wire rupture. In this work we show a method using magnetic Barkhausen noise that has shown high efficiency in the detection of armor wire rupture. The results are examined under the cyclic and static load conditions of the riser. This work also analyzes the theory behind the singular dependence of the magnetic Barkhausen noise on the applied tension in riser armor wires. (paper)

  8. Integrated groundwater data management

    Science.gov (United States)

    Fitch, Peter; Brodaric, Boyan; Stenson, Matt; Booth, Nathaniel; Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew

    2016-01-01

    The goal of a data manager is to ensure that data is safely stored, adequately described, discoverable and easily accessible. However, to keep pace with the evolution of groundwater studies in the last decade, the associated data and data management requirements have changed significantly. In particular, there is a growing recognition that management questions cannot be adequately answered by single discipline studies. This has led a push towards the paradigm of integrated modeling, where diverse parts of the hydrological cycle and its human connections are included. This chapter describes groundwater data management practices, and reviews the current state of the art with enterprise groundwater database management systems. It also includes discussion on commonly used data management models, detailing typical data management lifecycles. We discuss the growing use of web services and open standards such as GWML and WaterML2.0 to exchange groundwater information and knowledge, and the need for national data networks. We also discuss cross-jurisdictional interoperability issues, based on our experience sharing groundwater data across the US/Canadian border. Lastly, we present some future trends relating to groundwater data management.

  9. Integrated parasite management

    DEFF Research Database (Denmark)

    Clausen, Jesper Hedegaard; Madsen, Henry; Van, Phan Thi

    2015-01-01

    communities at risk through mass drug administration. However, we argue that treatment alone will not reduce the risk from eating infected fish and that sustainable effective control must adopt an integrated FZT control approach based on education, infrastructure improvements, and management practices...... that target critical control points in the aquaculture production cycle identified from a thorough understanding of FZT and host biology and epidemiology. We present recommendations for an integrated parasite management (IPM) program for aquaculture farms.......Fishborne zoonotic trematodes (FZT) are an emerging problem and there is now a consensus that, in addition to wild-caught fish, fish produced in aquaculture present a major food safety risk, especially in Southeast Asia where aquaculture is important economically. Current control programs target...

  10. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  11. Integral consideration of integrated management systems

    International Nuclear Information System (INIS)

    Frauenknecht, Stefan; Schmitz, Hans

    2010-01-01

    Aim of the project for the NPPs Kruemmel and Brunsbuettel (Vattenfall) is the integral view of the business process as basis for the implementation and operation of management systems in the domains quality, safety and environment. The authors describe the integral view of the business processes in the frame of integrated management systems with the focus nuclear safety, lessons learned in the past, the concept of a process-based controlling system and experiences from the practical realization.

  12. Integrated Financial Management Program

    Science.gov (United States)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  13. Integrated refinery waste management

    Energy Technology Data Exchange (ETDEWEB)

    Shieh, Y -S [ETG Environmental, Inc., Blue Bell, PA (US); Sheehan, W J [Separation and Recovery Systems, Inc., Irvine, CA (US)

    1992-01-01

    In response to the RCRA land ban regulations and TC rule promulgated by the U.S. Federal Environmental Protection Agency (EPA) in 1988-1990, an Integrated Refinery Waste Management (IRWM) program has been developed to provide cost-effective solutions to petroleum industry customers. The goal of IRWM is to provide technology based remediation treatment services to manage sludges and wastewaters generated from the oil refining processes, soils contaminated with petroleum distillates and groundwater contaminated with fuels. Resource recovery, volume reduction and waste minimization are the primary choices to mitigate environmental problems. Oil recovery has been performed through phase separation (such as centrifugation and filtration) and heating of heavy oils. Volume reduction is achieved by dewatering systems such as centrifuges and filter presses, and low temperature thermal treatment. Waste minimization can be accomplished by bioremediation and resource recovery through a cement kiln. (Author).

  14. Composite risers for deep-water offshore technology: Problems and prospects. 1. Metal-composite riser

    Science.gov (United States)

    Beyle, A. I.; Gustafson, C. G.; Kulakov, V. L.; Tarnopol'skii, Yu. M.

    1997-09-01

    Prospects for the application of advanced composites in the offshore technology of oil production are considered. The use of composites in vertical pipelines-risers seems to be the most efficient. The operating loads are studied and the attendant problems are formulated. A comparative analysis of the characteristics of metal, composite, and metal-composite deep-water risers is presented. A technique is developed for designing multilayered risers, taking into account the action of internal and external pressures, gravity, and the axial tensile force created by tensioners, as well as the residual technological stresses due to the difference in coefficients of thermal expansion, physical-chemical shrinkage, and force winding. Numerical estimations are given for a two-layered riser with an inner metal layer of steel, titanium, or aluminum alloys and a composite layer of glass- or carbon-fiber plastics formed by circumferential winding. It is shown that the technological stresses substantially affect the characteristics of the riser.

  15. Integrated Disability Management

    Directory of Open Access Journals (Sweden)

    Silvia Angeloni

    2013-10-01

    Full Text Available This article sets out to increase awareness regarding the wide and universal significance of disability, as well as the important benefits of an Integrated Disability Management (IDM approach. The scientific basis for IDM is explored in the first place through an analysis of its relationship to the International Classification of Functioning, Disability and Health (ICF. The conceptual paradigm of the ICF shares an ideological position with the IDM approach in that they are both underpinned by dynamic and multidimensional constructions of disability, which imply equally holistic and interdisciplinary responses. The IDM approach can be applied across a diversity of human situations to provide solutions that reflect the multifaceted and widespread nature of disability. The IDM approach is intended as a strategy capable of handling: inclusion of people with disabilities, active aging of human resources, health and safety in the workplace, prevention of disabilities and various diseases, return-to-work, absenteeism, and presenteeism.

  16. Evaluation of riser 14 temperature response

    International Nuclear Information System (INIS)

    OGDEN, D.M.

    1999-01-01

    The initial sluicing activities of Project WRSS resulted in a two month increase in temperatures as measured by the Riser 14 thermocouple tree of tank 241-C-106. While this increase was anticipated, the maximum temperature was higher than expected. An evaluation was performed to determine if adequate subcooling exists in the waste to continue sluicing activities. It was determined that a minimum of 10 F subcooling exists in the waste and that the higher Riser 14 temperatures were the result of higher than assumed waste saturation temperature

  17. Girassol, Riser Towers for ultra deep water

    Energy Technology Data Exchange (ETDEWEB)

    Rougier, Regis

    1999-07-01

    This is a brief presentation of the technical concept developed by ALTO MAR GIRASSOL (AMG) for the Girassol umbilical and flowlines system. In 1998 AMG was awarded a contract by Elf Exploration Angola for the engineering, procurement, construction and installation (EPCI) of the umbilical and flowline system. The technical concept is based around the use of sealine bundles and self-supporting hybrid riser towers which carry the production, water injection, gas injection, gas lift and service lines. The items discussed are: (1) selected field layout, (2) seabed flowlines, hybrid riser system, umbilicals, export lines, installation plan and overall project schedule.

  18. Reliability analysis of wake-induced collision of flexible risers

    OpenAIRE

    Fu, Ping; Leira, Bernt Johan; Myrhaug, Dag

    2017-01-01

    Collision between risers is an important design and operational concern, especially in deep water since the probability of collision tends to increase as the riser length increases. Riser collision is due to the joint effects of many processes, i.e. environmental loads, hydrodynamic interference and surface floater motions and the most of them are stochastic processes. This paper provides an approach for estimating the failure probability of riser collision by considering these joint effects ...

  19. Integrated supply chain risk management

    OpenAIRE

    Riaan Bredell; Jackie Walters

    2007-01-01

    Integrated supply chain risk management (ISCRM) has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly ...

  20. Integrated pest management

    International Nuclear Information System (INIS)

    LaBrecque, G.C.

    1981-01-01

    An effective Integrated Pest Management (IPM) programme requires a thorough knowledge of the biology of the target species, namely information on the dispersal, population densities and dynamics as well as the ecology of the natural enemies of the pest. Studies on these can be accomplished by radiolabelling techniques. In the event that conditions prevent the use of radioisotopes the insects can be labelled with either a rare earth or stable isotopes. All insects treated with the rare earths, once captured, are exposed to neutrons which produce radioactivity in the rare earths. There are two other approaches in the practical application of radiation to the problem of insect control: the exposure of insects to lethal doses of radiation and the release of sterile insects. The Insect and Pest Control Section contributes to all aspects of the sterile insect technique (SIT) and it is involved in the Agency's Coordinated Research Programme which permits scientists from the developing countries to meet to discuss agricultural problems and to devise means of solving crop-pest infestation problems by using isotopes and radiation. The success of radiation in insect pest control was underlined and reviewed at the international symposium on the sterile insect technique and the use of radiation in genetic insect control jointly organized by the FAO and the IAEA and held in the FRG in 1981. Another important action is the BICOT programme in Nigeria between the IAEA and the Government of Nigeria on the biological control of tsetse flies by SIT

  1. FCC riser quick separation system: a review

    Directory of Open Access Journals (Sweden)

    Zhi Li

    2016-10-01

    Full Text Available Abstract The riser reactor is the key unit in the fluid catalytic cracking (FCC process. As the FCC feedstocks become heavier, the product mixture of oil, gas and catalysts must be separated immediately at the outlet of the riser to avoid excessive coking. The quick separation system is the core equipment in the FCC unit. China University of Petroleum (Beijing has developed many kinds of separation system including the fender-stripping cyclone and circulating-stripping cyclone systems, which can increase the separation efficiency and reduce the pressure drop remarkably. For the inner riser system, a vortex quick separation system has been developed. It contains a vortex quick separator and an isolated shell. In order to reduce the separation time, a new type of separator called the short residence time separator system was developed. It can further reduce the separation time to less than 1 s. In this paper, the corresponding design principles, structure and industrial application of these different kinds of separation systems are reviewed. A system that can simultaneously realize quick oil gas separation, quick oil gas extraction and quick pre-stripping of catalysts at the end of the riser is the trend in the future.

  2. Integral control for population management.

    Science.gov (United States)

    Guiver, Chris; Logemann, Hartmut; Rebarber, Richard; Bill, Adam; Tenhumberg, Brigitte; Hodgson, Dave; Townley, Stuart

    2015-04-01

    We present a novel management methodology for restocking a declining population. The strategy uses integral control, a concept ubiquitous in control theory which has not been applied to population dynamics. Integral control is based on dynamic feedback-using measurements of the population to inform management strategies and is robust to model uncertainty, an important consideration for ecological models. We demonstrate from first principles why such an approach to population management is suitable via theory and examples.

  3. Integrated Information Management (IIM)

    National Research Council Canada - National Science Library

    McIlvain, Jason

    2007-01-01

    Information Technology is the core capability required to align our resources and increase our effectiveness on the battlefield by integrating and coordinating our preventative measures and responses...

  4. Integrated supply chain risk management

    Directory of Open Access Journals (Sweden)

    Riaan Bredell

    2007-11-01

    Full Text Available Integrated supply chain risk management (ISCRM has become indispensable to the theory and practice of supply chain management. The economic and political realities of the modern world require not only a different approach to supply chain management, but also bold steps to secure supply chain performance and sustainable wealth creation. Integrated supply chain risk management provides supply chain organisations with a level of insight into their supply chains yet to be achieved. If correctly applied, this process may optimise management decision-making and assist in the protection and enhancement of shareholder value.

  5. Integrated data management for RODOS

    International Nuclear Information System (INIS)

    Abramowicz, K.; Koschel, A.; Rafat, M.; Wendelgass, R.

    1995-12-01

    The report presents the results of a feasibility study on an integrated data organisation and management in RODOS, the real-time on-line decision support system for off-site nuclear emergency management. The conceptual design of the functional components of the integrated data management are described taking account of the software components and the operation environment of the RODOS system. In particular, the scheme architecture of a database integration manager for accessing and updating a multi-database system is discussed in detail under a variety of database management aspects. Furthermore, the structural design of both a simple knowledge database and a real-time database are described. Finally, some short comments on the benefits and disadvantages of the proposed concept of data integration in RODOS are given. (orig.) [de

  6. Application of corrosion screening tools for riser inspection

    International Nuclear Information System (INIS)

    Zamir Mohamed Daud; Vijayan, S.

    2003-01-01

    As offshore facilities approach the end of their design life, owners would like to assess the condition and integrity of plant and equipment. Detailed inspection, including non-destructive testing (NDT), are implemented and results are utilised for predictive maintenance and estimating useful remaining life. Except for risk based inspection, the extent of surface coverage required would be more compared to inspection of pre-determined spots. Risers, for example, usually have several layers of coating that prevent use of conventional techniques for inspection of corrosion. Complete coverage requires access (including removal coatings and insulation). Inspection utilising the conventional NDT tools can be very slow and expensive. However, recent advances have forwarded the use of specialised NDT techniques that were developed for inspection of corrosion under insulation (CUI). This paper details two screening inspection tools, LIXI Profiler and RTD-INCOTEST that have been applied to inspection of risers. LIXI Profiler is based on attenuation of penetrating radiation by materials, and RTD-INCOTEST is based on decay of pulsed eddy current in materials. (Author)

  7. Integrated Building Health Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Abstract: Building health management is an important part in running an efficient and cost-effective building. Many problems in a building’s system can go undetected...

  8. Vector form Intrinsic Finite Element Method for the Two-Dimensional Analysis of Marine Risers with Large Deformations

    Science.gov (United States)

    Li, Xiaomin; Guo, Xueli; Guo, Haiyan

    2018-06-01

    Robust numerical models that describe the complex behaviors of risers are needed because these constitute dynamically sensitive systems. This paper presents a simple and efficient algorithm for the nonlinear static and dynamic analyses of marine risers. The proposed approach uses the vector form intrinsic finite element (VFIFE) method, which is based on vector mechanics theory and numerical calculation. In this method, the risers are described by a set of particles directly governed by Newton's second law and are connected by weightless elements that can only resist internal forces. The method does not require the integration of the stiffness matrix, nor does it need iterations to solve the governing equations. Due to these advantages, the method can easily increase or decrease the element and change the boundary conditions, thus representing an innovative concept of solving nonlinear behaviors, such as large deformation and large displacement. To prove the feasibility of the VFIFE method in the analysis of the risers, rigid and flexible risers belonging to two different categories of marine risers, which usually have differences in modeling and solving methods, are employed in the present study. In the analysis, the plane beam element is adopted in the simulation of interaction forces between the particles and the axial force, shear force, and bending moment are also considered. The results are compared with the conventional finite element method (FEM) and those reported in the related literature. The findings revealed that both the rigid and flexible risers could be modeled in a similar unified analysis model and that the VFIFE method is feasible for solving problems related to the complex behaviors of marine risers.

  9. OTEC riser cable model and prototype testing

    Science.gov (United States)

    Kurt, J. P.; Schultz, J. A.; Roblee, L. H. S.

    1981-12-01

    Two different OTEC riser cables have been developed to span the distance between a floating OTEC power plant and the ocean floor. The major design concerns for a riser cable in the dynamic OTEC environment are fatigue, corrosion, and electrical/mechanical aging of the cable components. The basic properties of the cable materials were studied through tests on model cables and on samples of cable materials. Full-scale prototype cables were manufactured and were tested to measure their electrical and mechanical properties and performance. The full-scale testing was culminated by the electrical/mechanical fatigue test, which exposes full-scale cables to simultaneous tension, bending and electrical loads, all in a natural seawater environment.

  10. Riser equipment decontamination engineering task plan; TOPICAL

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  11. Riser equipment decontamination engineering task plan

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  12. Oscillation of a rigid catenary riser due to the internal two-phase flow

    Energy Technology Data Exchange (ETDEWEB)

    Bordalo, Sergio N.; Morooka, Celso K.; Cavalcante, Cesar C.P. [Universidade Estadual de Campinas (UNICAMP), SP (Brazil); Matt, Cyntia G.C.; Franciss, Ricardo [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas

    2008-07-01

    Production of petroleum reservoirs from deep and ultra-deep waters is of paramount importance in Brazil, and several researches are necessary to develop appropriated equipment and risers for those operational conditions. Risers are suspended pipes used to transport the petroleum fluids between the seabed and the floating production unit. The structural flexibility of riser's lines is conferred by its length when compared with the diameter, characterizing it as a slender body. The risers are submitted to large static and dynamic loads originated from its own weight, waves, currents, platform motions and the internal flow. These loadings may threaten, by fatigue, the structural integrity of the system, compromising its useful life, and so they must be considered in the riser's project. There is a large amount of knowledge in the literature about the effects of external loadings on these systems, but the effect of the internal flow remains vastly unexplored. The variation of the flow mass and momentum inside the riser causes a dynamic loading on this system, originating an oscillatory motion. Furthermore, the gas-liquid two-phase flow may assume several flow patterns (bubble, slug, intermittent or annular), each one possessing completely different characteristics. In this work, the influence of the internal flow on the oscillatory motion (whipping motion) of catenary risers is analyzed. To provide a better understanding of this physical phenomenon, a scaled apparatus was designed and built. The material used to manufacture the riser's model was a flexible silicone tube, and air and water were used to simulate the two-phase flow. The instrumentation used to measure the fluids flow rates and the sustaining force at the top of the model was installed in the apparatus. A video acquisition system was used to determine the displacements, and frequency spectrum, of color targets positioned throughout the model, under several flow conditions. The flow patterns

  13. Adaptive and integrated water management

    NARCIS (Netherlands)

    Pahl-Wostl, C.; Kabat, P.; Möltgen, J.

    2007-01-01

    Sustainable water management is a key environmental challenge of the 21st century. Developing and implementing innovative management approaches and how to cope with the increasing complexity and uncertainties was the theme of the first International Conference on Adaptive and Integrated Water

  14. Integrated coastal management in Uruguay

    International Nuclear Information System (INIS)

    2011-01-01

    Integrated coastal management in Uruguay Carmelo includes the following areas-Nueva Palmira challenges and opportunities for local development in a context of large-scale industrial (Conchillas Uruguay), coastal management and stream Arroyo Solis Solis Chico Grande, Punta Colorada and Punta Negra, Maldonado Province Arroyo Valizas and sustainable tourism.

  15. Networking of integrated pest management

    NARCIS (Netherlands)

    Lamichhane, Jay Ram; Aubertot, Jean Noël; Begg, Graham; Birch, Andrew Nicholas E.; Boonekamp, Piet; Dachbrodt-Saaydeh, Silke; Hansen, Jens Grønbech; Hovmøller, Mogens Støvring; Jensen, Jens Erik; Jørgensen, Lise Nistrup; Kiss, Jozsef; Kudsk, Per; Moonen, Anna Camilla; Rasplus, Jean Yves; Sattin, Maurizio; Streito, Jean Claude; Messéan, Antoine

    2016-01-01

    Integrated pest management (IPM) is facing both external and internal challenges. External challenges include increasing needs to manage pests (pathogens, animal pests and weeds) due to climate change, evolution of pesticide resistance as well as virulence matching host resistance. The complexity

  16. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    OpenAIRE

    Tomescu Ada Mirela

    2012-01-01

    The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc). The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and p...

  17. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  18. Natural Frequencies and Mode Shapes of Statically Deformed Inclined Risers

    KAUST Repository

    Alfosail, Feras

    2016-10-15

    We investigate numerically the linear vibrations of inclined risers using the Galerkin approach. The riser is modeled as an Euler-Bernoulli beam accounting for the nonlinear mid-plane stretching and self-weight. After solving for the initial deflection of the riser due to self-weight, we use a Galerkin expansion employing 15 axially loaded beam mode shapes to solve the eigenvalue problem of the riser around the static equilibrium configuration. This yields the riser natural frequencies and corresponding exact mode shapes for various values of inclination angles and tension. The obtained results are validated against a boundary-layer analytical solution and are found to be in good agreement. This constitutes a basis to study the nonlinear forced vibrations of inclined risers.

  19. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  20. An Integrated Knowledge Management System

    Directory of Open Access Journals (Sweden)

    Vasile Mazilescu

    2014-11-01

    Full Text Available The aim of this paper is to present a Knowledge Management System based on Fuzzy Logic (FLKMS, a real-time expert system to meet the challenges of the dynamic environment. The main feature of our integrated shell FLKMS is that it models and integrates the temporal relationships between the dynamic of the evolution of an economic process with some fuzzy inferential methods, using a knowledge model for control, embedded within the expert system’s operational knowledge base.

  1. Integrated Urban Water Quality Management

    DEFF Research Database (Denmark)

    Rauch, W.; Harremoës, Poul

    1995-01-01

    The basic features of integrated urban water quality management by means of deterministic modeling are outlined. Procedures for the assessment of the detrimental effects in the recipient are presented as well as the basic concepts of an integrated model. The analysis of a synthetic urban drainage...... system provides useful information for water quality management. It is possible to identify the system parameters that contain engineering significance. Continuous simulation of the system performance indicates that the combined nitrogen loading is dominated by the wastewater treatment plant during dry...

  2. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  3. Fatigue Strength of Titanium Risers - Defect Sensitivity

    Energy Technology Data Exchange (ETDEWEB)

    Babalola, Olusegun Tunde

    2001-07-01

    This study is centred on assessment of the fatigue strength of titanium fusion welds for deep-water riser's applications. Deep-water risers are subjected to significant fatigue loading. Relevant fatigue data for titanium fusion welds are very scarce. Hence there is a need for fatigue data and life prediction models for such weldments. The study has covered three topics: Fatigue testing, Fractography and defect assessment, and Fracture Mechanics modelling of fatigue crack growth. Two series of welded grade of titanium consisting of 14 specimens in each series were fatigue tested under constant amplitude loading. Prior to fatigue testing, strain gauge measurements of some specimens was conducted to enable the definition of stress range in the fatigue assessment procedure. The results were compared with finite solid element analysis and related to fatigue stresses in a riser pipe wall. Distribution and geometry of internal and surface defects both in the as-welded and in the post-weld machined conditions were assessed using fractography. This served as a tool to determine the fatigue initiation point in the welds. Fracture mechanics was applied to model fatigue strength of titanium welds with initiation from weld defects. Two different stress intensity factor formulations for embedded eccentrically placed cracks were used for analysis of elliptical cracks with the major axis parallel and close to one of the free surfaces. The methods were combined to give a satisfactory model for crack growth analysis. The model analyses crack growth of elliptical and semi-elliptical cracks in two directions, with updating of the crack geometry. Fatigue strength assessment was conducted using two crack growth models, the Paris-Erdogan relation with no threshold and the Donahue et al. relation with an implied threshold. The model was validated against experimental data, with a discussion on the choice of crack growth model. (author)

  4. Integrated Foreign Exchange Risk Management

    DEFF Research Database (Denmark)

    Aabo, Tom; Høg, Esben; Kuhn, Jochen

    Empirical research has focused on export as a proxy for the exchange rate exposure and the use of foreign exchange derivatives as the instrument to deal with this exposure. This empirical study applies an integrated foreign exchange risk management approach with a particular focus on the role...

  5. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  6. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  7. ASPECTS OF INTEGRATION MANAGEMENT METHODS

    Directory of Open Access Journals (Sweden)

    Artemy Varshapetian

    2015-10-01

    Full Text Available For manufacturing companies to succeed in today's unstable economic environment, it is necessary to restructure the main components of its activities: designing innovative product, production using modern reconfigurable manufacturing systems, a business model that takes into account the global strategy and management methods using modern management models and tools. The first three components are discussed in numerous publications, for example, (Koren, 2010 and is therefore not considered in the article. A large number of publications devoted to the methods and tools of production management, for example (Halevi, 2007. On the basis of what was said in the article discusses the possibility of the integration of only three methods have received in recent years, the most widely used, namely: Six Sigma method - SS (George et al., 2005 and supplements its-Design for six sigm? - DFSS (Taguchi, 2003; Lean production transformed with the development to the "Lean management" and further to the "Lean thinking" - Lean (Hirano et al., 2006; Theory of Constraints, developed E.Goldratt - TOC (Dettmer, 2001. The article investigates some aspects of this integration: applications in diverse fields, positive features, changes in management structure, etc.

  8. Design Integration of Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2009-01-01

    One of the problems in the building industry is a limited degree of learning from experiences of use and operation of existing buildings. Development of professional facilities management (FM) can be seen as the missing link to bridge the gap between building operation and building design....... Strategies, methods and barriers for the transfer and integration of operational knowledge into the design process are discussed. Multiple strategies are needed to improve the integration of FM in design. Building clients must take on a leading role in defining and setting up requirements and procedures...... on literature studies and case studies from the Nordic countries in Europe, including research reflections on experiences from a main case study, where the author, before becoming a university researcher, was engaged in the client organization as deputy project director with responsibility for the integration...

  9. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  10. Nuclear Plant Integrated Outage Management

    International Nuclear Information System (INIS)

    Gerstberger, C. R.; Coulehan, R. J.; Tench, W. A.

    1992-01-01

    This paper is a discussion of an emerging concept for improving nuclear plant outage performance - integrated outage management. The paper begins with an explanation of what the concept encompasses, including a scope definition of the service and descriptions of the organization structure, various team functions, and vendor/customer relationships. The evolvement of traditional base scope services to the integrated outage concept is addressed and includes discussions on changing customer needs, shared risks, and a partnership approach to outages. Experiences with concept implementation from a single service in 1984 to the current volume of integrated outage management presented in this paper. We at Westinghouse believe that the operators of nuclear power plants will continue to be aggressively challenged in the next decade to improve the operating and financial performance of their units. More and more customers in the U. S. are looking towards integrated outage as the way to meet these challenges of the 1990s, an arrangement that is best implemented through a long-term partnering with a single-source supplier of high quality nuclear and turbine generator outage services. This availability, and other important parameters

  11. Dynamic response of a riser under excitation of internal waves

    Science.gov (United States)

    Lou, Min; Yu, Chenglong; Chen, Peng

    2015-12-01

    In this paper, the dynamic response of a marine riser under excitation of internal waves is studied. With the linear approximation, the governing equation of internal waves is given. Based on the rigid-lid boundary condition assumption, the equation is solved by Thompson-Haskell method. Thus the velocity field of internal waves is obtained by the continuity equation. Combined with the modified Morison formula, using finite element method, the motion equation of riser is solved in time domain with Newmark-β method. The computation programs are compiled to solve the differential equations in time domain. Then we get the numerical results, including riser displacement and transfiguration. It is observed that the internal wave will result in circular shear flow, and the first two modes have a dominant effect on dynamic response of the marine riser. In the high mode, the response diminishes rapidly. In different modes of internal waves, the deformation of riser has different shapes, and the location of maximum displacement shifts. Studies on wave parameters indicate that the wave amplitude plays a considerable role in response displacement of riser, while the wave frequency contributes little. Nevertheless, the internal waves of high wave frequency will lead to a high-frequency oscillation of riser; it possibly gives rise to fatigue crack extension and partial fatigue failure.

  12. Severe Slugging in Air-Water Hybrid Riser System

    Directory of Open Access Journals (Sweden)

    Jing Gong

    2014-11-01

    Full Text Available In the subsea pipeline gathering system, severe slugging flow is prone to occur. Severe slugging flow brings major threat to production and flow assurance in oil and gas industry due to periodical pressure oscillation and large liquid volume. Currently many researchers pay much more attention on L-shaped riser, catenaries, and S-shaped riser; little research has been made on hybrid riser, which is applied in the Africa West and Gulf of Mexico oil fields. Flow characteristics simulation for hybrid riser is made in this paper, using the one-dimensional and quasi-equilibrium model to simulate not only the riser-base pressure, severe slugging period, and the liquid slug length of the whole system but also base-pressure in the flexible pipe section. The calculated results match well with the experiment data. Besides, the influence of flexible pipe to the severe slugging characteristics of hybrid riser system is analyzed, which are significant for the determination of riser structure.

  13. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  14. The Integrated Mode Management Interface

    Science.gov (United States)

    Hutchins, Edwin

    1996-01-01

    Mode management is the processes of understanding the character and consequences of autoflight modes, planning and selecting the engagement, disengagement and transitions between modes, and anticipating automatic mode transitions made by the autoflight system itself. The state of the art is represented by the latest designs produced by each of the major airframe manufacturers, the Boeing 747-400, the Boeing 777, the McDonnell Douglas MD-11, and the Airbus A320/A340 family of airplanes. In these airplanes autoflight modes are selected by manipulating switches on the control panel. The state of the autoflight system is displayed on the flight mode annunciators. The integrated mode management interface (IMMI) is a graphical interface to autoflight mode management systems for aircraft equipped with flight management computer systems (FMCS). The interface consists of a vertical mode manager and a lateral mode manager. Autoflight modes are depicted by icons on a graphical display. Mode selection is accomplished by touching (or mousing) the appropriate icon. The IMMI provides flight crews with an integrated interface to autoflight systems for aircraft equipped with flight management computer systems (FMCS). The current version is modeled on the Boeing glass-cockpit airplanes (747-400, 757/767). It runs on the SGI Indigo workstation. A working prototype of this graphics-based crew interface to the autoflight mode management tasks of glass cockpit airplanes has been installed in the Advanced Concepts Flight Simulator of the CSSRF of NASA Ames Research Center. This IMMI replaces the devices in FMCS equipped airplanes currently known as mode control panel (Boeing), flight guidance control panel (McDonnell Douglas), and flight control unit (Airbus). It also augments the functions of the flight mode annunciators. All glass cockpit airplanes are sufficiently similar that the IMMI could be tailored to the mode management system of any modern cockpit. The IMMI does not replace the

  15. A state space approach for the eigenvalue problem of marine risers

    KAUST Repository

    Alfosail, Feras

    2017-10-05

    A numerical state-space approach is proposed to examine the natural frequencies and critical buckling limits of marine risers. A large axial tension in the riser model causes numerical limitations. These limitations are overcome by using the modified Gram–Schmidt orthonormalization process as an intermediate step during the numerical integration process with the fourth-order Runge–Kutta scheme. The obtained results are validated against those obtained with other numerical methods, such as the finite-element, Galerkin, and power-series methods, and are found to be in good agreement. The state-space approach is shown to be computationally more efficient than the other methods. Also, we investigate the effect of a high applied tension, a high apparent weight, and higher-order modes on the accuracy of the numerical scheme. We demonstrate that, by applying the orthonormalization process, the stability and convergence of the approach are significantly improved.

  16. Integrated emergency management in KKG

    International Nuclear Information System (INIS)

    Kluegel, J.U.; Plank, H.

    2007-01-01

    The development and introduction of emergency measures in Switzerland was mainly characterized by the evaluation of international experience and by systematic analysis of beyond-design basis accidents within the framework of plant-specific probabilistic safety analyses. As early as in the mid-eighties, the Swiss regulatory authority demanded that measures be taken against severe accidents, and periodically added more detailed requirements, most recently in 2000 when the introduction of Severe Accident Management Guidelines (SMAG) was demanded for power operation as well as operation in the non-power mode. The SMAG were introduced at the Goesgen nuclear power station within a project in the period between 2003 and 2005. For this purpose, a concept of integrated emergency management was developed which is based on updates of the proven emergency manual. One important aspect of this integrative concept is the distinction between preventive and mitigating procedures by defining appropriate criteria. The findings made in the implementation phase of the project include the realization that the introduction of procedures dealing with severe accidents also requires the ability to develop new ways of thinking and acting in accident management. This implies the awareness that procedures covering severe accidents must be applied much more flexibly and in the light of the situation than regulations covering fault conditions. Also possibilities to simulate severe accidents were created within the project both for the development of procedures and for training plant operators and members of the emergency staff. (orig.)

  17. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    OpenAIRE

    Osmo Kauppila; Janne Härkönen; Seppo Väyrynen

    2015-01-01

    The integration of health and safety, environmental and quality (HSEQ) management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS), and a case study of an industry...

  18. Radioactive waste integrated management system

    Energy Technology Data Exchange (ETDEWEB)

    Song, D Y; Choi, S S; Han, B S [Atomic Creative Technology, Taejon (Korea, Republic of)

    2003-10-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication.

  19. Radioactive waste integrated management system

    International Nuclear Information System (INIS)

    Song, D. Y.; Choi, S. S.; Han, B. S.

    2003-01-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication

  20. Distribution Integrity Management Plant (DIMP)

    Energy Technology Data Exchange (ETDEWEB)

    Gonzales, Jerome F. [Los Alamos National Laboratory

    2012-05-07

    This document is the distribution integrity management plan (Plan) for the Los Alamos National Laboratory (LANL) Natural Gas Distribution System. This Plan meets the requirements of 49 CFR Part 192, Subpart P Distribution Integrity Management Programs (DIMP) for the LANL Natural Gas Distribution System. This Plan was developed by reviewing records and interviewing LANL personnel. The records consist of the design, construction, operation and maintenance for the LANL Natural Gas Distribution System. The records system for the LANL Natural Gas Distribution System is limited, so the majority of information is based on the judgment of LANL employees; the maintenance crew, the Corrosion Specialist and the Utilities and Infrastructure (UI) Civil Team Leader. The records used in this report are: Pipeline and Hazardous Materials Safety Administration (PHMSA) 7100.1-1, Report of Main and Service Line Inspection, Natural Gas Leak Survey, Gas Leak Response Report, Gas Leak and Repair Report, and Pipe-to-Soil Recordings. The specific elements of knowledge of the infrastructure used to evaluate each threat and prioritize risks are listed in Sections 6 and 7, Threat Evaluation and Risk Prioritization respectively. This Plan addresses additional information needed and a method for gaining that data over time through normal activities. The processes used for the initial assessment of Threat Evaluation and Risk Prioritization are the methods found in the Simple, Handy Risk-based Integrity Management Plan (SHRIMP{trademark}) software package developed by the American Pipeline and Gas Agency (APGA) Security and Integrity Foundation (SIF). SHRIMP{trademark} uses an index model developed by the consultants and advisors of the SIF. Threat assessment is performed using questions developed by the Gas Piping Technology Company (GPTC) as modified and added to by the SHRIMP{trademark} advisors. This Plan is required to be reviewed every 5 years to be continually refined and improved. Records

  1. Single-shell tank riser resistance to ground test plan

    International Nuclear Information System (INIS)

    Kiewert, L.R.

    1996-01-01

    This Test Procedure provides the general directions for conducting Single-Shell Tank Riser to Earth Measurements which will be used by engineering as a step towards providing closure for the Lightning Hazard Issue

  2. Numerical Modeling and Mechanical Analysis of Flexible Risers

    OpenAIRE

    Li, J. Y.; Qiu, Z. X.; Ju, J. S.

    2015-01-01

    ABAQUS is used to create a detailed finite element model for a 10-layer unbonded flexible riser to simulate the riser’s mechanical behavior under three load conditions: tension force and internal and external pressure. It presents a technique to create detailed finite element model and to analyze flexible risers. In FEM model, all layers are modeled separately with contact interfaces; interaction between steel trips in certain layers has been considered as well. FEM model considering contact ...

  3. INTEGRATED SUSTAINABLE MANGROVE FOREST MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cecep Kusmana

    2015-07-01

    Full Text Available Mangrove forest as a renewable resource must be managed based on sustainable basis in which the benefits of ecological, economic and social from the forest have to equity concern in achieving the optimum forest products and services in fulfill the needs of recent generation without destruction of future generation needs and that does not undesirable effects on the physical and social environment. This Sustainable Forest Management (SFM practices needs the supporting of sustainability in the development of social, economic and environment (ecological sounds simultaneously, it should be run by the proper institutional and regulations. In operational scale, SFM need integration in terms of knowledge, technical, consultative of stakeholders, coordination among sectors and other stakeholders, and considerations of ecological inter-relationship in which mangroves as an integral part of both a coastal ecosystem and a watershed (catchment area. Some tools have been developed to measure the performent of SFM, such as initiated by ITTO at 1992 and followed by Ministry of Forestry of Indonesia (1993, CIFOR (1995, LEI (1999, FSC (1999, etc., however, the true nuance of SFM’s performance is not easy to be measured. 

  4. Integrated Work Management: Overview, Course 31881

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-06-30

    Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes and describes IWM requirements is Procedure (P) 300, Integrated Work Management.

  5. IDMT, Integrated Decommissioning Management Tools

    International Nuclear Information System (INIS)

    Alemberti, A.; Castagna, P.; Marsiletti, M.; Orlandi, S.; Perasso, L.; Susco, M.

    2005-01-01

    Nuclear Power Plant decommissioning requires a number of demolition activities related to civil works and systems as well as the construction of temporary facilities used for treatment and conditioning of the dismantled parts. The presence of a radiological, potentially hazardous, environment due to the specific configuration and history of the plant require a professional, expert and qualified approach approved by the national safety authority. Dismantling activities must be designed, planned and analysed in detail during an evaluation phase taking into account different scenarios generated by possible dismantling sequences and specific waste treatments to be implemented. The optimisation process of the activities becomes very challenging taking into account the requirement of the minimisation of the radiological impact on exposed workers and people during normal and accident conditions. While remote operated equipment, waste treatment and conditioning facilities may be designed taking into account this primary goal also a centralised management system and corresponding software tools have to be designed and operated in order to guarantee the fulfilment of the imposed limits as well as the traceability of wastes. Ansaldo Nuclear Division has been strongly involved in the development of a qualified and certified software environment to manage the most critical activities of a decommissioning project. The IDMT system (Integrated Decommissioning Management Tools) provide a set of stand alone user friendly applications able to work in an integrated configuration to guarantee waste identification, traceability during treatment and conditioning process as well as location and identification at the Final Repository site. Additionally, the system can be used to identify, analyse and compare different specific operating scenarios to be optimised in term of both economical and radiological considerations. The paper provides an overview of the different phases of

  6. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  7. Composite Risers for Deepwater Applications Risers composites pour applications en mer profonde

    Directory of Open Access Journals (Sweden)

    Metivaud G.

    2006-11-01

    Full Text Available This paper is devoted to the high performance composite tubes developed by the Institut Français du Pétrole (IFP and Aerospatiale for deepwater risers applications. The design principles of the tubes are first presented, along with results of preliminary work carried out as part of the initial feasibility study. Applications of composite tubes to drilling riser Kill and Choke lines and to TLP production risers, both of which have been studied in detail, are then described. Technical and operational advantages obtained from such applications are discussed. Cet article présente les travaux réalisés par l'Institut Français du Pétrole et l'Aerospatiale dans le domaine des tubes composites haute performance pour les applications aux liaisons fond-surface de forage et de production en mer profonde. Les matériaux composites avancés sont une classe de matériaux très particulière, présentant à la fois des caractéristiques mécaniques élevées et une densité spécifique faible. Ils sont utilisés principalement par les industries de l'aéronautique et de l'espace, mais l'industrie pétrolière en mer profonde est un secteur où ils peuvent trouver dans l'avenir des applications très intéressantes, notamment les tubes de risers. Les tubes de risers pétroliers en mer présentent en effet une gamme de spécifications élevées (diamètres, pression, traction, fatigue dans un environnement sévère et leur poids suspendu peut pénaliser fortement les systèmes de forage ou de production par grande profondeur d'eau. Un premier concept de tube composite haute performance a été développé par IFP et Aerospatiale au début des années 1980 ; sa partie courante, réalisée par enroulement filamentaire de fibres de verre R ou de fibres de carbone, et son système d'embout ont été soumis à une série d'essais mécaniques (pression interne jusqu'à 105 MPa, traction supérieure à 1 000 kN pour un diamètre nominal de 0,1 m, millions de

  8. New tools for steel catenary risers inspection; Novas ferramentas para inspecao de risers tipo SCR

    Energy Technology Data Exchange (ETDEWEB)

    Camerini, Claudio Soligo; Marinho, Carla Alves; Raphael, Fabiana N.; Maia, Carlos [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Freitas, Miguel [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Lopes, Ricardo Tadeu; Rocha, Henrique [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia

    2005-07-01

    The Research Center of PETROBRAS and two of the Federal Brazilian Universities, PUC-Rio and UFRJ, have been developing two new projects in order to inspect risers of petroleum production. The first tool is an instrumented pig for profiling internal corrosion, having flexibility under diameter variations and independence related to thickness wall pipeline. The second one is a gammagraphy system remotely operated by ROVs, to be employed in alveoli corrosion and fatigue cracks detection in underwater pipelines. This work shows the trajectory of these two tools, describing laboratory and field tests and the future activities. (author)

  9. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  10. Refining fault slip rates using multiple displaced terrace risers-An example from the Honey Lake fault, NE California, USA

    Science.gov (United States)

    Gold, Ryan D.; Briggs, Richard W.; Crone, Anthony J.; DuRoss, Christopher B.

    2017-11-01

    Faulted terrace risers are semi-planar features commonly used to constrain Quaternary slip rates along strike-slip faults. These landforms are difficult to date directly and therefore their ages are commonly bracketed by age estimates of the adjacent upper and lower terrace surfaces. However, substantial differences in the ages of the upper and lower terrace surfaces (a factor of 2.4 difference observed globally) produce large uncertainties in the slip-rate estimate. In this investigation, we explore how the full range of displacements and bounding ages from multiple faulted terrace risers can be combined to yield a more accurate fault slip rate. We use 0.25-m cell size digital terrain models derived from airborne lidar data to analyze three sites where terrace risers are offset right-laterally by the Honey Lake fault in NE California, USA. We use ages for locally extensive subhorizontal surfaces to bracket the time of riser formation: an upper surface is the bed of abandoned Lake Lahontan having an age of 15.8 ± 0.6 ka and a lower surface is a fluvial terrace abandoned at 4.7 ± 0.1 ka. We estimate lateral offsets of the risers ranging between 6.6 and 28.3 m (median values), a greater than fourfold difference in values. The amount of offset corresponds to the riser's position relative to modern stream meanders: the smallest offset is in a meander cutbank position, whereas the larger offsets are in straight channel or meander point-bar positions. Taken in isolation, the individual terrace-riser offsets yield slip rates ranging from 0.3 to 7.1 mm/a. However, when the offset values are collectively assessed in a probabilistic framework, we find that a uniform (linear) slip rate of 1.6 mm/a (1.4-1.9 mm/a at 95% confidence) can satisfy the data, within their respective uncertainties. This investigation demonstrates that integrating observations of multiple offset elements (crest, midpoint, and base) from numerous faulted and dated terrace risers at closely spaced

  11. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  12. A case study on riser analysis of a drilling riser in deep waters; Estudo de caso: analises estruturais e hidrodinamicas de um riser de perfuracao em aguas profundas

    Energy Technology Data Exchange (ETDEWEB)

    Roveri, Francisco E.; Pestana, Rafael G. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil). Centro de Pesquisas

    2008-07-01

    This paper presents a set of structural and hydrodynamic analyses of a connected marine riser, in 1900 meter water depth. Operating windows are determined for one year return period environmental conditions and for a set of drilling fluid weight density values. Parametric analyses are carried out to study the riser response sensitivity to variations in environmental conditions, drilling fluid weight density, upper and lower flex joint rotational stiffness and vessel motion phase angles. Current, drilling fluid weight density and vessel motion phase angle changes affect significantly the system response, whereas the response is not significantly affected by changes in wave height, wave period and flex joint rotational stiffness. (author)

  13. The Architecture and Beyond of Tread and Riser

    Directory of Open Access Journals (Sweden)

    Sai Sanath

    2016-01-01

    The primary constitution of stairs is the arrangement of horizontal and vertical measures known as tread and riser. This is the simplest arrangement that essentially conveys people from one level to the other with required comfort and safety. Steps are a universal symbol with multiple interpretations. They are the most generally used similes in art, philosophy and psychology. Stairs occupy a unique status in the built environment because they not only convey people, but also symbolize the psychological, spiritual and artistic aspects of human nature. The mental significance and symbolic connotations of steps are deeply rooted. Understanding the role of stairs in different spheres of human need and expression is crucial in approaching its design. The pattern of stairs is dependent on the type of materials and other related design considerations. It is one of the unique architectural entities that reflect the various facets of social, psychological, artistic, metaphysical and religious dimensions. The importance of physical activity in the rising sedentary life styles is linked to the design of building elements, especially the staircases. The advancement in technology has displaced the role of stairs into an inconsequential means of emergency escape. But the importance of physical activity in the rising sedentary lifestyle has revitalized the concept of stairs as an active building component. The mono functional approach to staircases in high-rise buildings, especially as the means of escape in emergency situations, indicates that the design of staircases as multi functional element is still under the confines of design explorations. This paper is an attempt to understand the concept of stairs not only from the evolutionary point of view, but also the associated metaphoric meanings and its emerging multi facet identity. The concept of vertical accessibility in the form of tread and riser arrangement makes stairs a timeless phenomenon. The approach to multi utility

  14. Managing IT Integration Risk in Acquisitions

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Kettinger, William J.

    2016-01-01

    The article discusses a framework for evaluating risk of information technology (IT) integration in acquisitions. Topics include the use of the experience of serial acquirer Trelleborg AB to show the merits of the framework for managing the risk and to determine low-risk acquisitions......, the importance of managing IT integration risk, and various risk areas for acquisition IT integration....

  15. Integrated resource management of biomass

    International Nuclear Information System (INIS)

    Goodwin, E.R.

    1992-01-01

    An overview is presented of the use of biomass, with emphasis on peat, as an alternative energy source, from an integrated resource management perspective. Details are provided of the volume of the peat resource, economics of peat harvesting, and constraints to peat resource use, which mainly centre on its high water content. Use of waste heat to dry peat can increase the efficiency of peat burning for electric power generation, and new technologies such as gasification and turbo expanders may also find utilization. The burning or gasification of biomass will release no more carbon dioxide to the atmosphere than other fuels, has less sulfur content than solid fuels. The removal of peat reduces methane emissions and allows use of produced carbon dioxide for horticulture and ash for fertilizer, and creates space that may be used for forestry or agricultural biomass growth. 38 refs

  16. Integrated weed management in wheat

    International Nuclear Information System (INIS)

    Marwat, K.B.; Khan, M.A.; Nawab, K.; Khattak, A.M.

    2011-01-01

    The paper summarizes the results of an experiment conducted on wheat at Kohat, Khyber Pakhtunkhwa, Pakistan during winter 2004-05. Randomized complete block design with split-split-plot arrangement was used where wheat line and broadcast sowing were kept in main plots. Seed rates (100 and 150 kg ha-1) were assigned as sub-plots, while four herbicides (Topik, Isoproturon, Puma super and Buctril super) and weed check were assigned to sub-sub-plots. Results revealed that higher biological yield was recorded in line sowing. However, higher wheat seed rate decreased weed biomass and increased biological yield. Herbicides proved to be effective in decreasing weed biomass and enhancing grain yield and its contributing traits. It was suggested that line sowing in combination with higher seeding rate and Buctril super should be used in an integrated weed management fashion. However further studies are required to investigate various ranges of seeding rate and herbicides doses. (author)

  17. Integrated Computer System of Management in Logistics

    Science.gov (United States)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  18. Considerations on Integrating Risk and Quality Management

    Directory of Open Access Journals (Sweden)

    Maria POPESCU

    2011-03-01

    Full Text Available This paper aims to highlight the links between risk management and quality management and to study the possibility of their integrated approach. The study reviews the evolution of risk approach within organizations and stresses the need to increase the effectiveness of this approach by incorporating risk management methodology in the quality management system. Starting from this idea, the authors present the current state of risk approach into quality management, basic rules of integrated quality-risk management and major difficulties which may arise in the implementation of integrated quality–risk systems.

  19. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  20. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  1. Le comportement mécanique des risers. Influence des principaux paramètres Mechanical Behaviour of Marine Risers Mode of Influence of Principal Parameters

    Directory of Open Access Journals (Sweden)

    Sparks C.

    2006-11-01

    Full Text Available Cet article a pour but de déterminer les principaux paramètres qui gouvernent le comportement mécanique des risers de forage et de production, et d'expliquer pourquoi et comment ils interviennent. Une compréhension claire de ces influences permet d'optimiser rapidement un riser donné sans avoir recours à un grand nombre d'analyses par ordinateur. Celui qui conçoit un riser est principalement préoccupé par les points suivants : - niveaux de contraintes dans la partie courante du riser ; - mouvements angulaires à la base du riser (ou moments, dans le cas d'une liaison rigide ; - mouvements relatifs au niveau de la liaison plate-forme/riser. La méthode utilisée dans cet article consiste à établir des expressions analytiques valables pour des risers simplifiés. Les conclusions tirées de ces expressions ont ensuite été verifiéés à l'aide d'un programme de calcul capable de simuler le comportement dynamique d'un riser dans des configurations variées. This paper attempts to identify the principal parameters, that influence the behavior of drilling and production risers and to explain how and why they do so. Clear understanding of these influences enable particular risers to be optimised rapidly without recourse to an inordinate number of computer analyses. The points of greatest concern, to the riser designer, are: a Stress levels in the main length of riser. (b Angular movement at sea bed (or moment, if the connection is rigid. (c Relative movement at riser/platform connection. The approach, used in the paper, has been ta derive analytical expressions, for simplified riser cases. Conclusions drawn from these expressions have then been checked for validity, by using a dynamic analysis computer program to simulate a wide range of cases.

  2. Integrated management of childhood illness

    Directory of Open Access Journals (Sweden)

    1997-01-01

    Full Text Available Millones de defunciones en niños menores de 5 años se podrían prevenir en países en desarrollo si se aplicaran las medidas de control y los tratamientos eficaces que se usan normalmente en países desarrollados. Conscientes de la necesidad de hacer frente a las principales causas de enfermedad y muerte en la infancia (infecciones respiratorias agudas, enfermedades diarreicas, desnutrición, malaria y enfermedades prevenibles por medio de la vacunación mediante una iniciativa global, la OMS y el UNICEF han desarrollado una estrategia conocida por Atención Integrada de las Enfermedades Prevalentes de la Infancia (Integrated Management of Childhood Illness, IMCI. Sus oficinas regionales para las Américas, que son la OPS y el UNICEF-TACRO, han aceptado los objetivos y actividades descritos en el presente informe a fin de reorientar su labor y dirigirla hacia el mejoramiento del estado de salud infantil en este hemisferio.

  3. An efficient structural finite element for inextensible flexible risers

    Science.gov (United States)

    Papathanasiou, T. K.; Markolefas, S.; Khazaeinejad, P.; Bahai, H.

    2017-12-01

    A core part of all numerical models used for flexible riser analysis is the structural component representing the main body of the riser as a slender beam. Loads acting on this structural element are self-weight, buoyant and hydrodynamic forces, internal pressure and others. A structural finite element for an inextensible riser with a point-wise enforcement of the inextensibility constrain is presented. In particular, the inextensibility constraint is applied only at the nodes of the meshed arc length parameter. Among the virtues of the proposed approach is the flexibility in the application of boundary conditions and the easy incorporation of dissipative forces. Several attributes of the proposed finite element scheme are analysed and computation times for the solution of some simplified examples are discussed. Future developments aim at the appropriate implementation of material and geometric parameters for the beam model, i.e. flexural and torsional rigidity.

  4. Integrated Work Management: Preparer, Course 31883

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-07

    The preparer (also called the “planner”) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: Preparer (COURSE 31883), describes the IWM roles and responsibilities of the preparer. This course also discusses IWM requirements that must be met by the preparer.

  5. A state space approach for the eigenvalue problem of marine risers

    KAUST Repository

    Alfosail, Feras; Nayfeh, Ali H.; Younis, Mohammad I.

    2017-01-01

    A numerical state-space approach is proposed to examine the natural frequencies and critical buckling limits of marine risers. A large axial tension in the riser model causes numerical limitations. These limitations are overcome by using

  6. Integrated Co-management of Lakes through Beach Management Units

    OpenAIRE

    Goverment of Uganda; Department for International Development (DFID) of the UK Government

    2007-01-01

    Metadata only record In 1999, the Integrated Co-management of Lakes through Beach Management Units project was started in an effort to implement a new approach to the management of lake resources in Uganda. The main components of this plan involved decentralization, local community management, and improving the livelihood of the poor. In order to finance the management of these areas, the Beach Management Units (BMU's) are charging user fees to those individuals who obtain benefit from the...

  7. INTEGRATIVE AUGMENTATION OF STANDARDIZED MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav Karapetrovic

    2008-03-01

    Full Text Available The development, features and integrating abilities of different international standards related to management systems are discussed. A group of such standards that augment the performance of quality management systems in organizations is specifically focused on. The concept, characteristics and an illustrative example of one augmenting standard, namely ISO 10001, are addressed. Integration of standardized augmenting systems, both by themselves and within the overall management system, is examined. It is argued that, in research and practice alike, integrative augmentation represents the future of standardized quality and other management systems.

  8. Flexible riser global analysis for very shallow water

    OpenAIRE

    Karegar, Sadjad

    2013-01-01

    Master's thesis in Offshore technology Flexible risers are widely used for a range of water depths and can accommodate large floater motions when using a buoyant system. A wide range of buoyancy solutions have been developed for very shallow water (e.g. 30-50 m), shallow water (e.g. 90-110 m) and semi-deep water (e.g. 300-400 m) and in the ranges between these depths. Flexible risers can have different configurations. These different solutions have different characteristics which influe...

  9. Waste management - an integral part of environmental management systems

    Energy Technology Data Exchange (ETDEWEB)

    Hamm, Ulrich

    1998-12-01

    To consider waste as a resource instead of an annoyance with which the management has to cope with, has become an unavoidable task for modern managers. The task the management has to take to secure competitiveness in an environment of rising complexity of production processes and further increasing legal requirements, is to manage waste as much as other recourses are managed. Waste has to be considered an aspect of planning and decision process just as business plans or logistics are. Main themes discussed in this publication comprise waste management, implementation of waste management as an integral part of environmental management systems, and management approach to waste - the results. 4 figs.

  10. Integrated management of waterbirds: Beyond the conventional

    Science.gov (United States)

    Erwin, R.M.; Parsons, Katharine C.; Brown, Stephen C.; Erwin, R. Michael; Czech, Helen A.; Coulson, John C.

    2002-01-01

    Integrated waterbird management over the past few decades has implicitly referred to methods for managing wetlands that usually attempt to enhance habitat for taxonomic groups such as shorebirds and wading birds, in addition to waterfowl, the traditional focus group. Here I describe five elements of integration in management: taxonomic, spatial, temporal, population and habitat, and multiple-use management objectives. Spatial integration simply expands the scale of management concern. Rather than emphasizing management on a very limited number of impoundments or wetlands in small refuges or wildlife management areas, the vision is beginning to shift to connectivity within larger landscapes on the order of many square kilometers as telemetry data on daily and seasonal movements for many species become available. Temporal integration refers to the potential for either simultaneous management for waterbirds and commercial 'crops' (e.g., crayfish and rice) or for temporally-staggered management such as row crop production in spring-summer growing seasons and waterbird management on fallow fields in the non-growing (winter) season. Integrating population dynamics with habitats has become a major research focus over the past decade. Identifying which wetlands are ?sources? or ?sinks? for specific populations provides managers with critical information about effective management. Further, the applications of spatially explicit population models place heavy demands on researchers to identify use patterns for breeding and dispersing individuals by age, sex, and reproductive class. Population viability analysis models require much the same information. Finally, multiple-use management integration refers to trying to optimize the uses of wetlands, when only one (perhaps secondary) use may include waterbird management. Depending upon the ownership and primary land use of a particular parcel of land containing wetlands and/or water bodies, managing for waterbirds may be an

  11. Export channel pricing management for integrated solutions

    OpenAIRE

    Roine, Henna; Sainio, Liisa-Maija; Saarenketo, Sami

    2012-01-01

    This article studies systems integrators' export channel pricing management for integrated solutions. We find support from our empirical case study for the notion that a systems integrator's export channel pricing strategy is multidimensional and dependent on international pricing environment and partner characteristics and that export partnerships have unique implications on a systems integrator's pricing process. The results show that giving up pricing control in export channel context may ...

  12. Integrated solid waste management in Germany

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report covers Germany`s experience with integrated solid waste management programs. The municipal solid waste practices of four cities include practices and procedures that waste facility managers with local or state governments may consider for managing their own day-to-day operations.

  13. Integrating the autonomous subsystems management process

    Science.gov (United States)

    Ashworth, Barry R.

    1992-01-01

    Ways in which the ranking of the Space Station Module Power Management and Distribution testbed may be achieved and an individual subsystem's internal priorities may be managed within the complete system are examined. The application of these results in the integration and performance leveling of the autonomously managed system is discussed.

  14. Integrated Work Management: PIC, Course 31884

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-08

    The person-in-charge (PIC) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL, or the Laboratory) because the PIC is assigned responsibility and authority by the responsible line manager (RLM) for the overall validation, coordination, release, execution, and closeout of a work activity in accordance with IWM. This course, Integrated Work Management: PIC (Course 31884), describes the PIC’s IWM roles and responsibilities. This course also discusses IWM requirements that the PIC must meet. For a general overview of the IWM process, see self-study Course 31881, Integrated Work Management: Overview. For instruction on the preparer’s role, see self-study Course 31883, Integrated Work Management: Preparer.

  15. Preliminary optimal configuration on free standing hybrid riser

    Directory of Open Access Journals (Sweden)

    Kyoung-Su Kim

    2018-05-01

    Full Text Available Free Standing Hybrid Riser (FSHR is comprised of vertical steel risers and Flexible Jumpers (FJ. They are jointly connected to a submerged Buoyancy Can (BC. There are several factors that have influence on the behavior of FSHR such as the span distance between an offshore platform and a foundation, BC up-lift force, BC submerged location and FJ length.An optimization method through a parametric study is presented. Firstly, descriptions for the overall arrangement and characteristics of FSHR are introduced. Secondly, a flowchart for optimization of FSHR is suggested. Following that, it is described how to select reasonable ranges for a parametric study and determine each of optimal configuration options. Lastly, numerical analysis based on this procedure is performed through a case study. In conclusion, the relation among those parameters is analyzed and non-dimensional parametric ranges on optimal arrangements are suggested. Additionally, strength analysis is performed with variation in the configuration. Keywords: Free standing hybrid riser, Hybrid riser system, Buoyancy can, Flexible jumper, Deepwater, Multi-body dynamics

  16. Spectral fatigue analysis of a tensioned riser compliant tower

    NARCIS (Netherlands)

    Karadeniz, H.; Vrouwenvelder, A.C.W.M.; Shi, C.

    1998-01-01

    In this paper, the conceptual Tensioned Riser Compliant Tower (TRCT) structure of the Shell Oil, which is developed for a region of approximately 600 meter water depth of the West of Shetlands in the North Sea, is analyzed by using the SAPOS program of the Delft University of Technology. The fatigue

  17. modelling and modelling and simulation of coking in the riser

    African Journals Online (AJOL)

    eobe

    into the modeling of FCC riser by predicting catalyst coke content as a function of reaction by predicting ... understanding of the process, hence restricting scale up to within the ... MATLAB (R2009a) on a Compaq HP CQ61 laptop. The following ...

  18. Transaction management with integrity checking

    DEFF Research Database (Denmark)

    Martinenghi, Davide; Christiansen, Henning

    2005-01-01

    Database integrity constraints, understood as logical conditions that must hold for any database state, are not fully supported by current database technology. It is typically up to the database designer and application programmer to enforce integrity via triggers or tests at the application level....... 2.~In concurrent database systems, besides the traditional correctness criterion, the execution schedule must ensure that the different transactions can overlap in time without destroying the consistency requirements tested by other, concurrent transactions....

  19. Global challenges in integrated coastal zone management

    DEFF Research Database (Denmark)

    integration of data and information in policy and management, combining expertise from nature and social science, to reach a balanced and sustainable development of the coastal zone. This important book comprises the proceedings of The International Symposium on Integrated Coastal Zone Management, which took....../mitigation to change in coastal systems Coastal governance Linking science and management Comprising a huge wealth of information, this timely and well-edited volume is essential reading for all those involved in coastal zone management around the globe. All libraries in research establishments and universities where...

  20. Riser configuration, Tank 241-A-105, light duty utility arm

    International Nuclear Information System (INIS)

    Boucher, T.D.

    1994-01-01

    The light-duty utility arm (LDUA) is a seven-joint stainless steel robotic arm with a payload capacity of 75 lb. The robotic arm is deployed vertically with a maximum vertical reach of 63 ft. and a maximum horizontal reach of 13.5 ft. The functional requirements of the LDUA system are mapping and characterization of waste in Hanford single-shell tanks (SST) before and during waste retrieval. The LDUA system consists of a mobile deployment system (MDS), a vertical positioning mast (VPM), a tank riser interface confinement (TRIC), the LDUA, and a controller subsystem or support trailer. Currently, the system is in design and is subject to change; however, the LDUA or robotic arm will be deployed through a 12-in. riser above the tank dome. Field trips were performed to gather specifics for future deployment of the LDUA in Tank 241-A-105. The purpose of this report is to support two previous reports for the investigation of SSTs for deployment of the LDUA system. The first report identified the availability of risers while the second report identified the availability of Tanks 241-A-105, 241-A-S-109, 241-A-T-101, and 241-A-T-109 for deployment of the LDUA system. The second report also identified those 4- and 12-in. risers that could be used for deployment of the LDUA and camera system. This report addresses accessibility to the 241-A Tank Farm and the usability of the Tank 241-A-105 risers. The following information for assisting in the design and deployment of the LDUA will be discussed in this report: radiation survey; flange identification; high resolution video; computer simulated model; and field survey

  1. I-15 integrated corridor management : system requirements.

    Science.gov (United States)

    2011-07-01

    This document is intended as a listing and discussion of the Requirements for the I-15 Integrated Corridor Management System : (ICMS) Demonstration Project in San Diego. This document describes what the system is to do (the functional requirements), ...

  2. Factors influencing implementation of integrated management of ...

    African Journals Online (AJOL)

    intern

    implementation of health facility based Integrated Management of Childhood Illness ... community-owned resource persons (CORPs) to provide health education to care ... differing coverage of basic essential services such safe water supply, ...

  3. AN ASSESSMENT OF THE INTEGRATED PEST MANAGEMENT ...

    African Journals Online (AJOL)

    Integrated Pest Management Collaborative Research Support Program) has been applying a farmer participatory IPM strategy at on-farm research sites in eastern Uganda since 1995. Following five years of project implementation an evaluation ...

  4. Integrated Data for Improved Asset Management

    Science.gov (United States)

    2016-05-26

    The objective of this research is to demonstrate the potential benefits for agency-wide data integration for VDOT asset management. This objective is achieved through an example application that requires information distributed across multiple databa...

  5. Integrated management systems in the nuclear field

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2005-01-01

    In the last years several internationally accepted standards such as the ISO 9000 and ISO 14000 series and other function-specific management systems standards have been developed. At the same time, it has become imperative for organisations to continuously improve their overall quality, environmental and safety performance. Therefore, the need to create integrated management systems is of growing importance to enable an easier handling of the different management systems. This paper has two main objectives. The first one is to address the key issues in the underlying theory of integrated management systems including benefits and limits, the second one is to illustrate the importance of an integrated (in particular safety) management system and the experience feedback providing examples from different areas and different organisations in the nuclear field. (orig.)

  6. Integrated Solution Support System for Water Management

    NARCIS (Netherlands)

    Kassahun, A.; Blind, M.; Krause, A.U.M.; Roosenschoon, O.R.

    2008-01-01

    Solving water management problems involves technical, social, economic, political and legal challenges and thus requires an integrated approach involving people from different backgrounds and roles. The integrated approach has been given a prominent role within the European Union¿s Water Framework

  7. Integrating Sustainable Development into Operations Management Courses

    Science.gov (United States)

    Fredriksson, Peter; Persson, Magnus

    2011-01-01

    Purpose: It is widely acknowledged that aspects of sustainable development (SD) should be integrated into higher level operations management (OM) education. The aim of the paper is to outline the experiences gained at Chalmers University of Technology in Sweden from integrating aspects of SD into OM courses. Design/methodology/approach: The paper…

  8. Business process management and IT management: The missing integration

    DEFF Research Database (Denmark)

    Rahimi, Fatemeh; Møller, Charles; Hvam, Lars

    2016-01-01

    of IT on process innovations, the association between business process management and IT management is under-explored. Drawing on a literature analysis of the capabilities of business process and IT governance frameworks and findings from a case study, we propose the need for horizontal integration between the two......The importance of business processes and the centrality of IT to contemporary organizations' performance calls for a specific focus on business process management and IT management. Despite the wide scope of business process management covering both business and IT domains, and the profound impact...... management functions to enable strategic and operational business - IT alignment. We further argue that the role of IT in an organization influences the direction of integration between the two functions and thus the choice of integration mechanisms. Using case study findings, we propose...

  9. Partnering and integrated supply management

    DEFF Research Database (Denmark)

    Bjarnø, Ole-Christian; Olsen, Anders; Thyssen, Mikael

    2003-01-01

    for strategic management of collaborative relationships on a line with the purchasing perspectives offered by Supply Chain Management. Based on a study of the literature and an in-depth case study carried out within a large Scandinavian contractor, this article gives a proposal for how Partnering can...... be supported by strategic purchasing, with the aim of achieving strategic Partnering. The contribution of this article is thus the development of a new purchasing perspective within Construction Supply Chain Management.......Developments in the construction industry, with a lack of productivity increases compared to manufacturing industry in general, have amongst other things led to the use of Partnering, which is a form of collaboration which attempts to counteract the distrust and the sub-optimisation which...

  10. Managing harvest and habitat as integrated components

    Science.gov (United States)

    Osnas, Erik; Runge, Michael C.; Mattsson, Brady J.; Austin, Jane E.; Boomer, G. S.; Clark, R. G.; Devers, P.; Eadie, J. M.; Lonsdorf, E. V.; Tavernia, Brian G.

    2014-01-01

    In 2007, several important initiatives in the North American waterfowl management community called for an integrated approach to habitat and harvest management. The essence of the call for integration is that harvest and habitat management affect the same resources, yet exist as separate endeavours with very different regulatory contexts. A common modelling framework could help these management streams to better understand their mutual effects. Particularly, how does successful habitat management increase harvest potential? Also, how do regional habitat programmes and large-scale harvest strategies affect continental population sizes (a metric used to express habitat goals)? In the ensuing five years, several projects took on different aspects of these challenges. While all of these projects are still on-going, and are not yet sufficiently developed to produce guidance for management decisions, they have been influential in expanding the dialogue and producing some important emerging lessons. The first lesson has been that one of the more difficult aspects of integration is not the integration across decision contexts, but the integration across spatial and temporal scales. Habitat management occurs at local and regional scales. Harvest management decisions are made at a continental scale. How do these actions, taken at different scales, combine to influence waterfowl population dynamics at all scales? The second lesson has been that consideration of the interface of habitat and harvest management can generate important insights into the objectives underlying the decision context. Often the objectives are very complex and trade-off against one another. The third lesson follows from the second – if an understanding of the fundamental objectives is paramount, there is no escaping the need for a better understanding of human dimensions, specifically the desires of hunters and nonhunters and the role they play in conservation. In the end, the compelling question is

  11. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    Directory of Open Access Journals (Sweden)

    Osmo Kauppila

    2015-06-01

    Full Text Available The integration of health and safety, environmental and quality (HSEQ management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS, and a case study of an industry-led HSEQ cluster in Northern Finland. The results demonstrate that some of the most prominent current trends are the harmonization of the high level structure of management systems by ISO, the evaluation of IMS, accounting for the supply chain in HSEQ issues, and sustainability and risk management. The results of the study can be used by practitioners to get a view of the current state of HSEQ management systems and their integration, and by researchers to seek out potential directions for HSEQ and IMS related research.

  12. Integrated pest management - an overview and update

    Science.gov (United States)

    Thomas D. Landis; R. Kasten Dumroese

    2014-01-01

    Integrated pest management, better known as IPM, is a familiar term for those of us working in forest, conservation, and native plant nurseries. An almost synonymous concept is "holistic pest management" that has been the topic of chapters in recent Agriculture Handbooks that would be useful to growers of native plants (see Landis and others 2009; Landis and...

  13. Integration of operational research and environmental management

    NARCIS (Netherlands)

    Bloemhof - Ruwaard, J.M.

    1996-01-01


    The subject of this thesis is the integration of Operational Research and Environmental Management. Both sciences play an important role in the research of environmental issues. Part I describes a framework for the interactions between Operational Research and Environmental Management.

  14. Integrated Approach to User Account Management

    Science.gov (United States)

    Kesselman, Glenn; Smith, William

    2007-01-01

    IT environments consist of both Windows and other platforms. Providing user account management for this model has become increasingly diffi cult. If Microsoft#s Active Directory could be enhanced to extend a W indows identity for authentication services for Unix, Linux, Java and Macintosh systems, then an integrated approach to user account manag ement could be realized.

  15. Implementing Integrated River Basin Management in China

    Directory of Open Access Journals (Sweden)

    Dorri G. J. te Boekhorst

    2010-06-01

    Full Text Available This paper examines the role of the World Wildlife Fund for Nature China as policy entrepreneur in China. It illustrates the ways in which the World Wildlife Fund for Nature is active in promoting integrated river basin management in the Yangtze River basin and how the efforts at basin level are matched with the advice of the China Council for International Cooperation on Environment and Development task force on integrated river basin management to the national government of China. This article demonstrates that the World Wildlife Fund for Nature uses various strategies of different types to support a transition process towards integrated river basin management. Successful deployment of these strategies for change in environmental policy requires special skills, actions, and attitudes on the part of the policy entrepreneur, especially in China, where the government has a dominant role regarding water management and the position of policy entrepeneurs is delicate.

  16. PENATAAN RUANG LAUT BERDASARKAN INTEGRATED COASTAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Dina Sunyowati

    2008-10-01

    Full Text Available The planning of coastal spatial arrangement must be put in the valid spatial planning system. Law Number 26 of 2007 on Spatial Planning and it is in fact related with land spatial planning, although that ocean and air spatial management will be arranged in separate law. The legal for coastal zone management is determined by using the principles of integrated coastal management by focusing on area or zone authority system. The integrated of coastal zones management regulations should be followed by the planning of coastal spatial arrange­ment. Therefore, certain synchronization at coastal zones governance is very important issue since by integrating and coordinating other related regulations and therefore conflict of norm can be minimized in the spatial planning coastal zone.

  17. Integrated therapy safety management system

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-01-01

    Aims The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an ‘integrated therapy safety management’ is drafted. This concept could serve as a basis to improve resilience. Methods The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for ‘integrated therapy safety management’. The concept is applied by way of example for the ‘medication process’ to demonstrate its practical implementation. Results The ‘integrated therapy safety management’ is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of ‘bridge managers’. ‘Bridge managers’ anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the ‘bridge managers’ and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. Conclusions The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. PMID:24007448

  18. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  19. Knowledge and information management for integrated water resource management

    Science.gov (United States)

    Watershed information systems that integrate data and analytical tools are critical enabling technologies to support Integrated Water Resource Management (IWRM) by converting data into information, and information into knowledge. Many factors bring people to the table to participate in an IWRM fra...

  20. Integrated water and waste management

    DEFF Research Database (Denmark)

    Harremoës, P.

    1997-01-01

    The paper discusses concepts and developments within water quantity, water quality, integrated environmental assessment and wastewater treatment. The historical and the global perspectives are used in the discussion of the role of engineers in today's society. Sustainabilty and ethics are taken...... into the analysis. There is a need for re-evaluation of the resource, society and environment scenarios with a view to the totality of the system and with proper analysis of the flow of water and matter through society. Among the tools are input-output analysis and cradle to grave analysis, in combination...... with compilation of identified sets of values with respect to sustainable use of resources and ultimate fate of the environment and quality of life. The role of the engineer is to make available to society as many technical options as possible - and to put these options into the proper perspective in relation...

  1. Y-12 Integrated Materials Management System

    Energy Technology Data Exchange (ETDEWEB)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-06-03

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.

  2. Integrated solid waste management in megacities

    Directory of Open Access Journals (Sweden)

    M.A. Abdoli

    2016-05-01

    Full Text Available Rapid urbanization and industrialization, population growth and economic growth in developing countries make management of municipal solid waste more complex comparing with developed countries. Furthermore, the conventional municipal solid waste management approach often is reductionists, not tailored to handle complexity. Therefore, the need to a comprehensive and multi-disciplinary approach regarding the municipal solid waste management problems is increasing. The concept of integrated solid waste management is accepted for this aim all over the world. This paper analyzes the current situation as well as opportunities and challenges regarding municipal solid waste management in Isfahan according to the integrated solid waste management framework in six aspects: environmental, political/legal, institutional, socio-cultural, financial/economic, technical and performance aspects. Based on the results obtained in this analysis, the main suggestions for future integrated solid waste management of Isfahan are as i promoting financial sustainability by taking the solid waste fee and reducing the expenses through the promoting source collection of recyclable materials, ii improving compost quality and also marketing the compost products simultaneously, iii promoting the private sector involvements throughout the municipal solid waste management system.

  3. Integrating incident investigation into the management system

    International Nuclear Information System (INIS)

    Peterson, E.E.

    1992-01-01

    In the last 10 yr, the size and frequency of incidents affecting the communities and environment surrounding chemical processing facilities has increased. The chemical process industry, which has always concerned itself with the safety of its facilities, has responded by committing to stricter standards of operation and management. A critical element of these management practices is the use of a structured incident investigation program. Many facilities have implemented and disciplined themselves to perform good investigation of incidents. However, most of these facilities maintain incident investigation as part of their safety management programs. This allows the process to be disconnected from the management system that deals with the day-to-day business of the facility. The first step of integration is understanding the objectives and functions of the management system into which the integration is to occur. To begin, a common definition of management is needed. Management, for the purposes of this discussion, is defined as the system of activities used to control, coordinate, and improve the flow of work within a facility or organization. This definition refers to several concepts that need further development in order to understand how incident investigation can be integrated into a management system, including (a) flow of work, (b) control, and (c) improvement. Application can be made to the nuclear industry

  4. Y-12 Integrated Materials Management System

    International Nuclear Information System (INIS)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-01-01

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system

  5. Integrated management in calcareous soils

    International Nuclear Information System (INIS)

    Castilla, Luis A; Salive, A

    2001-01-01

    Rice growing is developed in different kinds of soils, and some of the have high bases saturation, especially calcium and magnesium, as well as medium to high carbonate contents. This causes negative effects in the development and growth of the rice plant. As a consequence, several researching actions have been under-taken, and they are aimed at becoming this problem in economically manageable. Among the strategies we have, some of them are as follows: evaluating rice varieties presenting tolerance to these soils; using inorganic fertilizers looking for a response to elements, sources, dose and application times; evaluating organic fertilizers, mainly the green ones; using amendments, and physical soil management. According to the results, we have the fertilization response with major and minor elements and with the statistical differences at a 0.05% level. A response was found with elements such as zinc, copper, boron, iron, phosphorus and potassium. However, the efficiency of these elements depends on the addition of amendments as sulfur, the use of green fertilizers and farming systems that eliminate the superficial compaction of these soils, besides the use of varieties which are more tolerant to alkalinity, just like Fedearroz-50

  6. Renewed mer model of integral management

    Directory of Open Access Journals (Sweden)

    Janko Belak

    2015-12-01

    Full Text Available Background: The research work on entrepreneurship, enterprise's policy and management, which started in 1992, successfully continued in the following years. Between 1992 and 2011, more than 400 academics and other researchers have participated in research work (MER research program whose main orientation has been the creation of their own model of integral management. Results: In past years, academics (researchers and authors of published papers from Austria, Belgium, Bosnia and Herzegovina, Bulgaria, Byelorussia, Canada, the Czech Republic, Croatia, Estonia, France, Germany, Hungary, Italy, Poland, Romania, Russia, the Slovak Republic, Slovenia, Switzerland, Ukraine, and the US have cooperated in MER programs, coming from more than fifty institutions. Thus, scientific doctrines of different universities influenced the development of the MER model which is based on both horizontal and vertical integration of the enterprises' governance and management processes, instruments and institutions into a consistently operating unit. Conclusions: The presented MER model is based on the multi-layer integration of governance and management with an enterprise and its environment, considering the fundamental desires for the enterprises' existence and, thus, their quantitative as well as qualitative changes. The process, instrumental, and institutional integrity of the governance and management is also the initial condition for the implementation of all other integration factors.

  7. CFD Simulation of Vortex Induced Vibration for FRP Composite Riser with Different Modeling Methods

    Directory of Open Access Journals (Sweden)

    Chunguang Wang

    2018-04-01

    Full Text Available Steel risers are widely used in offshore oil and gas industry. However, the production capacity and depths are limited due to their extreme weight and poor fatigue and corrosion resistance. Nowadays, it is confirmed that fiber reinforced polymer (FRP composite risers have apparent advantages over steel risers. However, the study of vortex induced vibration (VIV for composite risers is rarely involved. Three different risers (one steel riser and two composite risers were compared for their VIV characteristics. The effects of 2D and 3D models and fluid–structure interaction (FSI were considered. The models of composite risers are established by effective modulus method (EMM and layered-structure method (LSM. It is found that 2D model are only suitable for ideal condition, while, for real situation, 3D model with FSI has to be considered. The results show that the displacements of the FRP composite risers are significantly larger than those of the steel riser, while the stresses are reversed. In addition, the distributions of the displacements and stresses depend on the geometries, material properties, top-tension force, constraints, etc. In addition, it is obvious that EMM are suitable to study the global working condition while LSM can be utilized to obtain the results in every single composite layer.

  8. Mathematics of flexible risers including pressure and internal flow affects

    Energy Technology Data Exchange (ETDEWEB)

    Seyed, F.B. (John Brown Engineers and Constructors Ltd., London (GB)); Patel, M.H. (University Coll., London (GB). Dept. of Mechanical Engineering)

    1992-01-01

    Derivations are presented for calculation of pressure and internal flow induced forces on flexible risers and other curved pipes using a mathematically rigorous approach. Approximate and exact methods are presented for calculation of pressure forces on straight and curved pipes in two dimensions. The mathematical identity of these equations with those for effective tension is illustrated. The force arising from the flow of an internal fluid of constant density is then calculated and combined with those for pressure forces in derivation of the catenary equations including pressure and internal flow terms. It is shown that internal flow contributes a new term to the expression for effective tension. These governing equations are then reduced for the specific cases of simple catenary, steep-S, lazy-S, steep-wave and lazy-wave risers. In each case, the solution method has been presented and the governing equilibrium and geometric compatability conditions cited. (author).

  9. Power management techniques for integrated circuit design

    CERN Document Server

    Chen, Ke-Horng

    2016-01-01

    This book begins with the premise that energy demands are directing scientists towards ever-greener methods of power management, so highly integrated power control ICs (integrated chip/circuit) are increasingly in demand for further reducing power consumption. * A timely and comprehensive reference guide for IC designers dealing with the increasingly widespread demand for integrated low power management * Includes new topics such as LED lighting, fast transient response, DVS-tracking and design with advanced technology nodes * Leading author (Chen) is an active and renowned contributor to the power management IC design field, and has extensive industry experience * Accompanying website includes presentation files with book illustrations, lecture notes, simulation circuits, solution manuals, instructors manuals, and program downloads.

  10. Remote installation of risers on underground nuclear waste storage tanks

    International Nuclear Information System (INIS)

    Jackson, J.P.; Gessner, R.F.

    1988-03-01

    The West Valley Demonstration Project was established to solidify 2120 m 3 (560,000) gallons of high-level nuclear waste generated during six years of commercial nuclear fuel reprocessing. This liquid will be processed to remove radioactive elements which, with the remaining sludge, will be combined with glass formers and be converted into borosilicate glass. Risers were installed on the high-level tank for installation of pumps which will be used to remove the liquid and sludge. The extensive use of remote technology was required to install the risers and to minimize operator exposure to high levels of radiation and contamination. The riser installation required remotely: drilling through two feet of concrete shielding; installing pump access pipes which are welded to the tank top; and cutting holes in tanks located 3658 mm (12) feet below ground. These operations were successfully completed 13 times without exposing personnel to high-level radiation or contamination. Specially designed remote equipment was developed for each step of this operation. Extensive operator training in the use of this equipment was performed on a tank with low radiation prior to work on the high-level tank. This paper discusses the application of remote technology that assured a quality job was safely accomplished. 3 refs., 18 figs., 2 tabs

  11. CANDU plant life management - An integrated approach

    International Nuclear Information System (INIS)

    Hopkins, J.R.

    1998-01-01

    An integrated approach to plant life management has been developed for CANDU reactors. Strategies, methods, and procedures have been developed for assessment of critical systems structures and components and for implementing a reliability centred maintenance program. A Technology Watch program is being implemented to eliminate 'surprises'. Specific work has been identified for 1998. AECL is working on the integrated program with CANDU owners and seeks participation from other CANDU owners

  12. Faulted terrace risers place new constraints on the late Quaternary slip rate for the central Altyn Tagh fault, northwest Tibet

    Science.gov (United States)

    Gold, R.D.; Cowgill, E.; Arrowsmith, J.R.; Chen, X.; Sharp, W.D.; Cooper, K.M.; Wang, X.-F.

    2011-01-01

    The active, left-lateral Altyn Tagh fault defines the northwestern margin of the Tibetan Plateau in western China. To clarify late Quaternary temporal and spatial variations in slip rate along the central portion of this fault system (85??-90??E), we have more than doubled the number of dated offset markers along the central Altyn Tagh fault. In particular, we determined offset-age relations for seven left-laterally faulted terrace risers at three sites (Kelutelage, Yukuang, and Keke Qiapu) spanning a 140-km-long fault reach by integrating surficial geologic mapping, topographic surveys (total station and tripod-light detection and ranging [T-LiDAR]), and geochronology (radiocarbon dating of organic samples, 230Th/U dating of pedogenic carbonate coatings on buried clasts, and terrestrial cosmogenic radionuclide exposure age dating applied to quartz-rich gravels). At Kelutelage, which is the westernmost site (37.72??N, 86.67??E), two faulted terrace risers are offset 58 ?? 3 m and 48 ?? 4 m, and formed at 6.2-6.1 ka and 5.9-3.7 ka, respectively. At the Yukuang site (38.00??N, 87.87??E), four faulted terrace risers are offset 92 ?? 12 m, 68 ?? 6 m, 55 ?? 13 m, and 59 ?? 9 m and formed at 24.2-9.5 ka, 6.4-5.0 ka, 5.1-3.9 ka, and 24.2-6.4 ka, respectively. At the easternmost site, Keke Qiapu (38.08??N, 88.12??E), a faulted terrace riser is offset 33 ?? 6 m and has an age of 17.1-2.2 ka. The displacement-age relationships derived from these markers can be satisfied by an approximately uniform slip rate of 8-12 mm/yr. However, additional analysis is required to test how much temporal variability in slip rate is permitted by this data set. ?? 2011 Geological Society of America.

  13. Integration of Standardized Management Systems: A Dilemma?

    Directory of Open Access Journals (Sweden)

    Manuel Ferreira Rebelo

    2015-06-01

    Full Text Available The growing proliferation of management systems standards (MSSs, and their individualized implementation, is a real problem faced by organizations. On the other hand, MSSs are aimed at improving efficiency and effectiveness of organizational responses in order to satisfy the requirements, needs and expectations of the stakeholders. Each organization has its own identity and this is an issue that cannot be neglected; hence, two possible approaches can be attended. First, continue with the implementation of individualized management systems (MSs; or, integrate the several MSSs versus related MSs into an integrated management system (IMS. Therefore, in this context, organizations are faced with a dilemma, as a result of the increasing proliferation and diversity of MSSs. This paper takes into account the knowledge gained through a case study conducted in the context of a Portuguese company and unveils some of the advantages and disadvantages of integration. A methodology is also proposed and presented to support organizations in developing and structuring the integration process of their individualized MSs, and consequently minimize problems that are generators of inefficiencies, value destruction and loss of competitiveness. The obtained results provide relevant information that can support Top Management decision in solving that dilemma and consequently promote a successful integration, including a better control of business risks associated to MSSs requirements and enhancing sustainable performance, considering the context in which organizations operate.

  14. Development and implementation of integrated management system

    International Nuclear Information System (INIS)

    Tomov, E.; Nenkova, B.

    2013-01-01

    Risk Engineering Ltd is a private Bulgarian company in the field of scientific technical consultancy and engineering services, established in 1990. The aim of this report is to present the experience of Risk Engineering Ltd. in the development, implementation and operation of an integrated management system. The process of implementation of the system was completed at the end of 2011. In January 2012, the Risk Engineering Integrated Management System was certified by Lloyd's Register for compliance with standards ISO 9001:2008, ISO 140001:2004 and BS OHSAS 18001:2007

  15. Integrated economic management. Principal aspects and future

    International Nuclear Information System (INIS)

    2004-01-01

    Now that five years have passed (1999-2003) since the Owner Companies decided to merge the Asco and Vandellos-II nuclear power plants, we believe that, for Integrated Management through a single AIE, it is timely and advisable to describe the key issues of the process implemented to optimize economic results, always in accordance with the Policies of Nuclear Safety, Quality and Environment, Prevention, Human Factors and Availability, and we emphasize the following as essential elements: The Corporate Model; strategic/Operating Plans; integrated Economic Management Model SIE; Rationalization of the organizational structure, Continuous Training; Analysis of Processes and Procedures. (Author)

  16. Economic Exposure and Integrated Risk Management

    OpenAIRE

    Miller, Kent D.

    1994-01-01

    Most corporate risk management research focuses on particular risk exposures to the exclusion of other interrelated exposures. By contrast, this study models corporate risk exposures using a multivariate approach integrating the distinct exposures of interest to finance and strategy researchers. The paper addresses the implications of multivariate modeling for corporate risk management, some key methodological issues arising in empirical estimation of corporate economic exposrues, and direc...

  17. Integrated Management System - Scope, Possibilities And Methodology

    Science.gov (United States)

    Čekanová, Katarína

    2015-06-01

    Organizations are becoming more aware of the importance of integrated management systems (IMS). Interest in this subject indicates that IMS are seen as "management systems of the future". Based on this, the aim of this articles characterizes the possibility of building IMS through the identification of common elements and specific requirements in accordance with the ISO 9001, ISO 14001 and OHSAS 18001 professional references. Part of the article is the methodology of building IMS in the organization.

  18. Toward integrated design of waste management technologies

    International Nuclear Information System (INIS)

    Carnes, S.A.; Wolfe, A.K.

    1994-01-01

    Implementation of waste management technologies has been hindered by the intervention of diverse interests. Relying on a perceived history of inadequate and improper management, operations, and technological design, critics have stymied the implementation of scientifically and governmentally approved technologies and facilities, leading to a critical shortage of hazardous, mixed, and radioactive waste management capacity. The research and development (R ampersand D) required to identify technologies that are simultaneously (1) scientifically valid, (2) economically sound, and (3) publicly acceptable must necessarily address, in an integrated and interdisciplinary manner, these three criteria and how best to achieve the integration of stakeholders early in the technology implementation process (i.e., R ampersand D, demonstration, and commercialization). The goal of this paper is to initiate an identification of factors likely to render radioactive and hazardous waste management technologies publicly acceptable and to provide guidance on how technological R ampersand D might be revised to enhance the acceptability of alternative waste management technologies. Principal among these factors are the equitable distribution of costs, risks, and benefits of waste management policies and technologies, the equitable distribution of authority for making waste management policy and selecting technologies for implementation, and the equitable distribution of responsibility for resolving waste management problems. Stakeholder participation in assessing the likely distribution of these factors and mitigative mechanisms to enhance their equitable distribution, together with stakeholder participation in policy and technology R ampersand D, as informed by stakeholder assessments, should enhance the identification of acceptable policies and technologies

  19. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  20. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  1. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  2. Development and characterization of composite materials for production of composite risers by filament winding

    Energy Technology Data Exchange (ETDEWEB)

    Sobrinho, L.L.; Bastian, F.L. [Federal University of Rio de Janeiro, RJ (Brazil). Dept. of Metallurgical and Materials Engineering], e-mail: ledjane@metalmat.ufrj.br; Calado, V.M.A. [Federal University of Rio de Janeiro, RJ (Brazil). Escola de Quimica

    2008-07-01

    Industry has been challenged to provide riser systems which are more cost effective and which can fill the technology gaps with respect to water depth, riser diameter and high temperatures left open by flexible, steel catenary risers (SCRs) and hybrid risers. Composite materials present advantages over conventional steel risers because composite materials are lighter, more fatigue and corrosion resistant, better thermal insulators and can be designed for improving the structural and mechanical response. Besides, composite materials present some attractive attributes for the offshore service, such as: high specific strength and stiffness. This paper focuses on the development and characterization of a polymer matrix (epoxy) and of material composite (epoxy/fiber glass), which will be used in a development for composites risers by the filament winding process (wet winding). (author)

  3. Integrating cost management and work management concepts for operations

    International Nuclear Information System (INIS)

    Vanditmars, C.

    1995-01-01

    Development of B C Gas Utility Limited's integrated work and cost management system was described, with emphasis on cost management without reliance on the financial systems, and standard costing and operational side benefits. The objectives of the system were identified as dynamic monitoring and control, and local empowerment. The concept underlying the two systems was explained in detail. In the case of the work management system the ability to manage all work in operations areas was stressed, along with its universal availability. Other benefits expected included improved resource utilization, improved productivity, better control of cost, improved revenue generation, superior customer service, a simplified financial system, and improved employee motivation through empowerment

  4. Response prediction of long flexible risers subject to forced harmonic vibration

    OpenAIRE

    Riveros, Carlos Alberto; Utsunomiya, Tomoaki; Maeda, Katsuya; Itoh, Kazuaki

    2010-01-01

    Several research efforts have been directed toward the development of models for response prediction of flexible risers. The main difficulties arise from the fact that the dynamic response of flexible risers involves highly nonlinear behavior and a self-regulated process. This article presents a quasi-steady approach for response prediction of oscillating flexible risers. Amplitude-dependent lift coefficients are considered, as is an increased mean drag coefficient model during synchronizatio...

  5. Plant life management. Progress for structural integrity

    International Nuclear Information System (INIS)

    Solin, J.

    2003-03-01

    A joint project cluster of industry, VTT and other R and D suppliers is dealing with managing of lifetime of critical structures and components in energy and process industry. The research topics include systematic component lifetime management, data management, integrity and lifetime of pressure bearing components, non-destructive inspection, interactions of coolant and materials, environmentally assisted cracking and ageing of reactor internals. This Symposium is a compilation of selected papers describing an intermediate status of the projects after three years of research and development. (orig.)

  6. Integrated Pest Management Research Symposium: The Proceedings

    Science.gov (United States)

    Susan J. Branham; Robert C. Thatcher; [Editors

    1985-01-01

    Thirty-seven papers are presented that summarize the findings from research and development work conducted as a part of the Integrated Pest Management RD&A Program for Bark Beetles of Southern Pines during the 5-year period 1980-85. Presentations cover the areas of sampling and impact assessment, bark beetle biology and ecology, host susceptibility, host/pest...

  7. Integrated Management of Structural Pests in Schools.

    Science.gov (United States)

    Illinois State Dept. of Public Health, Springfield.

    The state of Illinois is encouraging schools to better inspect and evaluate the causes of their pest infestation problems through use of the Integrated Pest Management (IPM) guidelines developed by the Illinois Department of Public Health. This guide reviews the philosophy and organization of an IPM program for structural pests in schools,…

  8. Integrated System Health Management Development Toolkit

    Science.gov (United States)

    Figueroa, Jorge; Smith, Harvey; Morris, Jon

    2009-01-01

    This software toolkit is designed to model complex systems for the implementation of embedded Integrated System Health Management (ISHM) capability, which focuses on determining the condition (health) of every element in a complex system (detect anomalies, diagnose causes, and predict future anomalies), and to provide data, information, and knowledge (DIaK) to control systems for safe and effective operation.

  9. Implementing Integrated River Basin Management in China

    NARCIS (Netherlands)

    Boekhorst, D.G.J. te; Smits, A.J.M.; Yu, X.; Lifeng, L.; Lei, G.; Zhang, C.

    2010-01-01

    This paper examines the role of the World Wildlife Fund for Nature China as policy entrepreneur in China. It illustrates the ways in which the World Wildlife Fund for Nature is active in promoting integrated river basin management in the Yangtze River basin and how the efforts at basin level are

  10. Factors influencing implementation of integrated management of ...

    African Journals Online (AJOL)

    Background: Save the Children Tanzania has been supporting several projects in Lindi Region including implementation of health facility based Integrated Management of Childhood Illness (IMCI) services in Kilwa, Ruangwa and Lindi rural districts. The objective of this study was to assess the IMCI services in a sample of ...

  11. Integrated environment, safety, and health management system description

    International Nuclear Information System (INIS)

    Zoghbi, J. G.

    2000-01-01

    The Integrated Environment, Safety, and Health Management System Description that is presented in this document describes the approach and management systems used to address integrated safety management within the Richland Environmental Restoration Project

  12. Risk Informed Structural Systems Integrity Management

    DEFF Research Database (Denmark)

    Nielsen, Michael Havbro Faber

    2017-01-01

    The present paper is predominantly a conceptual contribution with an appraisal of major developments in risk informed structural integrity management for offshore installations together with a discussion of their merits and the challenges which still lie ahead. Starting point is taken in a selected...... overview of research and development contributions which have formed the basis for Risk Based Inspection Planning (RBI) as we know it today. Thereafter an outline of the methodical basis for risk informed structural systems integrity management, i.e. the Bayesian decision analysis is provided in summary....... The main focus is here directed on RBI for offshore facilities subject to fatigue damages. New ideas and methodical frameworks in the area of robustness and resilience modeling of structural systems are then introduced, and it is outlined how these may adequately be utilized to enhance Structural Integrity...

  13. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  14. Tools for in service monitoring and testing of riser to prevent failure and extend service life

    Energy Technology Data Exchange (ETDEWEB)

    Ward, Haakon; Bondevik, Jon Olav; Skjerve, Haavard; Tveit, Oeyvind [SeaFlex AS, Asker (Norway)

    2005-07-01

    Exploration and development of new oil and gas fields is heavily dependant on use of flexible pipes and many field developments would not have been possible without them. The number of flexible risers in service is constantly increasing since relatively few offshore projects have reached the estimated operational life and the operational lifetime of several fields in-service has been extended due to new and improved technology. Many risers have been in service over a large number of years. Some risers have been operated under demanding conditions such as severe dynamic loads, high pressure and temperatures. One may in some cases find that risers actually have shorter service life than estimated in the design phase due to the severe operational conditions. In order to extend the use of the riser, some risers may have to be modified and re-terminated and prepared for a new and less demanding application. In order to operate risers safely, it is important to re-assess the fatigue life in order to prevent potential riser failure. The operator should implement methods and tools for in-service monitoring and testing. This paper addresses efficient and reliable methods and tools for monitoring of critical operational parameters as well as in-service riser testing. A brief description of structural failure modes will also be given in order to understand how to interpret test results in view of potential failure modes. (author)

  15. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  16. Ontology modeling in physical asset integrity management

    CERN Document Server

    Yacout, Soumaya

    2015-01-01

    This book presents cutting-edge applications of, and up-to-date research on, ontology engineering techniques in the physical asset integrity domain. Though a survey of state-of-the-art theory and methods on ontology engineering, the authors emphasize essential topics including data integration modeling, knowledge representation, and semantic interpretation. The book also reflects novel topics dealing with the advanced problems of physical asset integrity applications such as heterogeneity, data inconsistency, and interoperability existing in design and utilization. With a distinctive focus on applications relevant in heavy industry, Ontology Modeling in Physical Asset Integrity Management is ideal for practicing industrial and mechanical engineers working in the field, as well as researchers and graduate concerned with ontology engineering in physical systems life cycles. This book also: Introduces practicing engineers, research scientists, and graduate students to ontology engineering as a modeling techniqu...

  17. Integrated Simulation Of Supply Chain Management

    Directory of Open Access Journals (Sweden)

    N.Manikandan

    2013-06-01

    Full Text Available Nowadays, manufacturers face the challenge of reducing manufacturing cycle time, delivery lead time and inventory reduction. Every organization has its own objectives and its own way of decision making processes. Because of the conflictions among the objectives of each organization and non-integrated decision making processes, there has been a need for a new mechanism, which help to resolve those conflictions and to integrate processes. In the early 1990s, management is a process of integrating and utilizing suppliers, manufacturers, warehouses and retailers, so that goods are produced and delivered at the right quantities and at the right time while minimizing costs as well as satisfying customer requirements. Managing the entire supply chain becomes a key factor for the successful business. Organizations now realize that non-integrated manufacturing processes, nonintegrated distribution processes and poor relationships with suppliers and customers are in adequate for their success. The supply chain areas are affected by the organization’s plan. The organization plan’s impact on the supply chain areas cannot be predicted before its execution. Simulation paves way to evaluate the performance of plans before the execution of the plan. This paper describes the effort of developing a simulation model for the supply chain management in an industry. This article discusses the requirement of supply chain simulation modeling.

  18. Integrated waste and water management system

    Science.gov (United States)

    Murray, R. W.; Sauer, R. L.

    1986-01-01

    The performance requirements of the NASA Space Station have prompted a reexamination of a previously developed integrated waste and water management system that used distillation and catalytic oxydation to purify waste water, and microbial digestion and incineration for waste solids disposal. This system successfully operated continuously for 206 days, for a 4-man equivalent load of urine, feces, wash water, condensate, and trash. Attention is given to synergisms that could be established with other life support systems, in the cases of thermal integration, design commonality, and novel technologies.

  19. Open Source GIS based integrated watershed management

    Science.gov (United States)

    Byrne, J. M.; Lindsay, J.; Berg, A. A.

    2013-12-01

    Optimal land and water management to address future and current resource stresses and allocation challenges requires the development of state-of-the-art geomatics and hydrological modelling tools. Future hydrological modelling tools should be of high resolution, process based with real-time capability to assess changing resource issues critical to short, medium and long-term enviromental management. The objective here is to merge two renowned, well published resource modeling programs to create an source toolbox for integrated land and water management applications. This work will facilitate a much increased efficiency in land and water resource security, management and planning. Following an 'open-source' philosophy, the tools will be computer platform independent with source code freely available, maximizing knowledge transfer and the global value of the proposed research. The envisioned set of water resource management tools will be housed within 'Whitebox Geospatial Analysis Tools'. Whitebox, is an open-source geographical information system (GIS) developed by Dr. John Lindsay at the University of Guelph. The emphasis of the Whitebox project has been to develop a user-friendly interface for advanced spatial analysis in environmental applications. The plugin architecture of the software is ideal for the tight-integration of spatially distributed models and spatial analysis algorithms such as those contained within the GENESYS suite. Open-source development extends knowledge and technology transfer to a broad range of end-users and builds Canadian capability to address complex resource management problems with better tools and expertise for managers in Canada and around the world. GENESYS (Generate Earth Systems Science input) is an innovative, efficient, high-resolution hydro- and agro-meteorological model for complex terrain watersheds developed under the direction of Dr. James Byrne. GENESYS is an outstanding research and applications tool to address

  20. Anchoring FRP Composite Armor in Flexible Offshore Riser Systems

    DEFF Research Database (Denmark)

    Costache, Andrei

    things, they serve for the transportation of hydrocarbons from the subsea facilities to the production and drilling equipment at the sea surface. Flexible risers are the prime choice for connecting floating production, storage and offloading facilities, because they are specially designed for dynamic...... counterpart. A new double grip design with flat faces is proposed, in which the loads are transferred through friction. The behavior of such grip is studied by means of experimental testing and finite element modeling. Several iterations of the grip system were evaluated over the course of the project...

  1. Integrated solid waste management in Japan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    The Japanese, through a combination of public policy, private market conditions, a geographic necessity, practice integrated municipal solid waste (MSW) management. The approach of MSW management in Japan is as follows: The basic concept of refuse treatment consists of recycling discharged refuse into usable resources, reusing such resources as much as possible, and then treating or disposing of the usable portion into a sanitary condition. Considering the difficulty of procuring land or seaside areas for such purpose as a refuse disposal site, it will be necessary to minimize the volume of refuse collected for treatment or disposal.

  2. Increasing efficiency through integrated energy data management

    International Nuclear Information System (INIS)

    Brack, M.

    2002-01-01

    This article discusses how improved management of energy data can bring about the increase in efficiency that is necessary for an electricity enterprise operating in a liberalised electricity market. The relevant technical and business processes involved for a typical power distribution utility are described. The present situation is reviewed and the various physical, data-logistics and commercial 'domains' involved are examined. Possible solutions for energy data logistics and integrated data management are discussed from the points of view of the operating utility, the power supplier and those responsible for balancing out supply and demand

  3. Integrated Systems Health Management for Intelligent Systems

    Science.gov (United States)

    Figueroa, Fernando; Melcher, Kevin

    2011-01-01

    The implementation of an integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive at an accurate and reliable assessment of its health. In this paper, concepts, procedures, and approaches are presented as a foundation for implementing an intelligent systems ]relevant ISHM capability. The capability stresses integration of DIaK from all elements of a system. Both ground-based (remote) and on-board ISHM capabilities are compared and contrasted. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems.

  4. Asset management -- Integrated software optimizes production performance

    International Nuclear Information System (INIS)

    Polczer, S.

    1998-01-01

    Developments in data collection and retrieval systems to allow timely cost analysis, financial reporting and production management are discussed. One of the most important new OLAP (on-line analytical processing) products is Energy Warehouse which gathers field information from various sources, allows advanced searches, and generates reports previously unavailable in other conventional financial accounting systems. Another OLAP-based system, the Canadian Upstream Energy System (CUES), was developed by the Oracle Corporation and the Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle's universal data server software development tools with ATS's upstream financial, land, geotechnical and production applications. ATS also developed a product called IDPMARS (Integrated Daily Production Management Accounting Reporting System). It interfaces with CUES to link working interests, government royalties, administration, facility charges, lifting costs, transportation tooling, and customers by integrating field data collection systems with financial accounting

  5. Asset management -- Integrated software optimizes production performance

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.

    1998-10-01

    Developments in data collection and retrieval systems to allow timely cost analysis, financial reporting and production management are discussed. One of the most important new OLAP (on-line analytical processing) products is Energy Warehouse which gathers field information from various sources, allows advanced searches, and generates reports previously unavailable in other conventional financial accounting systems. Another OLAP-based system, the Canadian Upstream Energy System (CUES), was developed by the Oracle Corporation and the Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle`s universal data server software development tools with ATS`s upstream financial, land, geotechnical and production applications. ATS also developed a product called IDPMARS (Integrated Daily Production Management Accounting Reporting System). It interfaces with CUES to link working interests, government royalties, administration, facility charges, lifting costs, transportation tooling, and customers by integrating field data collection systems with financial accounting.

  6. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  7. Making Technology Ready: Integrated Systems Health Management

    Science.gov (United States)

    Malin, Jane T.; Oliver, Patrick J.

    2007-01-01

    This paper identifies work needed by developers to make integrated system health management (ISHM) technology ready and by programs to make mission infrastructure ready for this technology. This paper examines perceptions of ISHM technologies and experience in legacy programs. Study methods included literature review and interviews with representatives of stakeholder groups. Recommendations address 1) development of ISHM technology, 2) development of ISHM engineering processes and methods, and 3) program organization and infrastructure for ISHM technology evolution, infusion and migration.

  8. Investigation of Integrated Vehicle Health Management Approaches

    Science.gov (United States)

    Paris, Deidre

    2005-01-01

    This report is to present the work that was performed during the summer in the Advance Computing Application office. The NFFP (NASA Faculty Fellow Program) had ten summer faculty members working on IVHM (Integrated Vehicle Health Management) technologies. The objective of this project was two-fold: 1) to become familiar with IVHM concepts and key demonstrated IVHM technologies; and 2) to integrate the research that has been performed by IVHM faculty members into the MASTLAB (Marshall Avionic Software Test Lab). IVHM is a NASA-wide effort to coordinate, integrate and apply advanced software, sensors and design technologies to increase the level of intelligence, autonomy, and health state of future vehicles. IVHM is an important concept because it is consistent with the current plan for NASA to go to the moon, mars, and beyond. In order for NASA to become more involved in deep exploration, avionic systems will need to be highly adaptable and autonomous.

  9. Management of area-wide integrated pest management programmes that integrate the sterile insect technique

    International Nuclear Information System (INIS)

    Dyck, V.A.; Vreysen, M.J.B.; Reyes Flores, J.; Regidor Fernandez, E.E.; Teruya, T.; Barnes, B.; Gomez Riera, P.; Lindquist, D.; Loosjes, M.

    2005-01-01

    Effective management of area-wide integrated pest management (AW-IPM) programmes that integrate the sterile insect technique (SIT) is key to success. Programme planning includes collection of baseline data and a feasibility assessment. The optimal management structure is where the programme can be implemented effectively and flexibly, independent of government politics, bureaucracy, and even corruption that impede timely goal achievement. Ideally, programmes include both public and private management, and require strong and steady financial support. Governments and donors are the most common sources of funds, but a mixture of public, community, and private funds is now the trend. Interrupted cash flow severely restrains programme performance. Physical support of programme operations must be reliable, and led by a maintenance professional. It is essential to have full-time, well-paid, and motivated staff led by a programme manger with technical and management experience. Programme failure is usually due to poor management and inadequate public support, and not to poor technology. (author)

  10. Singing mitigation in an export riser via liquid injection: a field case study

    NARCIS (Netherlands)

    Belfroid, S.P.C.; Korst, H.J.C.; Beek, P.J.G. van; Lunde, K.; Eidsvik, I.G.; Hansen, F.; Olsen, B.

    2014-01-01

    Flexible Risers are prone to the generation of high amplitude tonal noise, i.e. a so-called singing riser. Recently, severe vibrations and high noise levels were encountered on the turret of an FPSO in the Norwegian Sea, resulting in significantly reduced production. The vibrations could be

  11. Modelling and Simulation of Coking in the Riser of an Industrial ...

    African Journals Online (AJOL)

    Modelling and Simulation of Coking in the Riser of an Industrial Fluid Catalytic Cracking (FCC) Unit. ... Log in or Register to get access to full text downloads. ... The yields of LCO, gasoline, gas and coke that were predicted by the model for industrial risers were ... Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  12. An analytic solution of the static problem of inclined risers conveying fluid

    KAUST Repository

    Alfosail, Feras; Nayfeh, Ali H.; Younis, Mohammad I.

    2016-01-01

    We use the method of matched asymptotic expansion to develop an analytic solution to the static problem of clamped–clamped inclined risers conveying fluid. The inclined riser is modeled as an Euler–Bernoulli beam taking into account its self

  13. A management systems approach to pipeline integrity

    Energy Technology Data Exchange (ETDEWEB)

    Abes, J. [CC Technologies Canada, Calgary, AB (Canada)

    2008-07-01

    A management systems approach to pipeline integrity was discussed in terms of accident causation models, lessons from accidents, and management systems. Accident causation models include the Heinrich domino theory; epidemiological models; event chain models; and system-based models. A review of the Bellingham pipeline accident showed that if the pipeline had not been weakened by external damage, it likely would have been able to withstand the pressure that occurred on the day of the rupture, and the accident would not have happened. It was also determined that there was inadequate inspection of excavation work during the water treatment plant project and consequently, there was a failure to identify and repair the damage done to the pipeline. The presentation also addressed other findings, such as inaccurate evaluation of in-line pipeline inspection data; failure to manage and protect the supervisory control and data acquisition system (SCADA); and ineffective management oversight of construction and activation of products terminal. The Carlsbad pipeline explosion was also presented as another example of an accident. Several violations by El Paso were cited, including failure to ensure that qualified personnel performed internal corrosion control procedures; failure to perform necessary tests for corrosion; and failure to follow procedures for continuing surveillance of its facilities. Last, the presentation provided a definition of management systems and discussed the characteristics and elements of a management system. These elements included policy and leadership commitment; organizational structure and responsibilities; management of resources; communication plan; document and records management; operational controls; management of change; and continual improvement. 1 fig.

  14. Integrating Process Management with Archival Management Systems: Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Gordon Daines, III

    2009-03-01

    Full Text Available The Integrated Digital Special Collections (INDI system is a prototype of a database-driven, Web application designed to automate and manage archival workflow for large institutions and consortia. This article discusses the how the INDI project enabled the successful implementation of a process to manage large technology projects in the Harold B. Lee Library at Brigham Young University. It highlights how the scope of these technology projects is set and how the major deliverables for each project are defined. The article also talks about how the INDI system followed the process and still failed to be completed. It examines why the process itself is successful and why the INDI project failed. It further underscores the importance of process management in archival management systems.

  15. Stochastic dynamic analysis of marine risers considering Gaussian system uncertainties

    Science.gov (United States)

    Ni, Pinghe; Li, Jun; Hao, Hong; Xia, Yong

    2018-03-01

    This paper performs the stochastic dynamic response analysis of marine risers with material uncertainties, i.e. in the mass density and elastic modulus, by using Stochastic Finite Element Method (SFEM) and model reduction technique. These uncertainties are assumed having Gaussian distributions. The random mass density and elastic modulus are represented by using the Karhunen-Loève (KL) expansion. The Polynomial Chaos (PC) expansion is adopted to represent the vibration response because the covariance of the output is unknown. Model reduction based on the Iterated Improved Reduced System (IIRS) technique is applied to eliminate the PC coefficients of the slave degrees of freedom to reduce the dimension of the stochastic system. Monte Carlo Simulation (MCS) is conducted to obtain the reference response statistics. Two numerical examples are studied in this paper. The response statistics from the proposed approach are compared with those from MCS. It is noted that the computational time is significantly reduced while the accuracy is kept. The results demonstrate the efficiency of the proposed approach for stochastic dynamic response analysis of marine risers.

  16. Mesh refinement of simulation with the AID riser transmission gamma

    International Nuclear Information System (INIS)

    Lima Filho, Hilario J.B. de; Benachour, Mohand; Dantas, Carlos C.; Brito, Marcio F.P.; Santos, Valdemir A. dos

    2013-01-01

    Type reactors Circulating Fluidized Bed (CFBR) vertical, in which the particulate and gaseous phases have flows upward (riser) have been widely used in gasification processes, combustion and fluid catalytic cracking (FCC). These biphasic reactors (gas-solid) efficiency depends largely on their hydrodynamic characteristics, and shows different behaviors in the axial and radial directions. The solids axial distribution is observed by the higher concentration in the base, getting more diluted toward the top. Radially, the solids concentration is characterized as core-annular, in which the central region is highly diluted, consisting of dispersed particles and fluid. In the present work developed a two-dimensional geometry (2D) techniques through simulations in computational fluid dynamics (CFD) to predict the gas-solid flow in the riser type CFBR through transient modeling, based on the kinetic theory of granular flow . The refinement of computational meshes provide larger amounts of information on the parameters studied, but may increase the processing time of the simulations. A minimum number of cells applied to the mesh construction was obtained by testing five meshes. The validation of the hydrodynamic parameters was performed using a range of 241Am source and detector NaI (Tl). The numerical results were provided consistent with the experimental data, indicating that the refined computational mesh in a controlled manner, improve the approximation of the expected results. (author)

  17. Reconstruction of Twist Torque in Main Parachute Risers

    Science.gov (United States)

    Day, Joshua D.

    2015-01-01

    The reconstruction of twist torque in the Main Parachute Risers of the Capsule Parachute Assembly System (CPAS) has been successfully used to validate CPAS Model Memo conservative twist torque equations. Reconstruction of basic, one degree of freedom drop tests was used to create a functional process for the evaluation of more complex, rigid body simulation. The roll, pitch, and yaw of the body, the fly-out angles of the parachutes, and the relative location of the parachutes to the body are inputs to the torque simulation. The data collected by the Inertial Measurement Unit (IMU) was used to calculate the true torque. The simulation then used photogrammetric and IMU data as inputs into the Model Memo equations. The results were then compared to the true torque results to validate the Model Memo equations. The Model Memo parameters were based off of steel risers and the parameters will need to be re-evaluated for different materials. Photogrammetric data was found to be more accurate than the inertial data in accounting for the relative rotation between payload and cluster. The Model Memo equations were generally a good match and when not matching were generally conservative.

  18. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    OpenAIRE

    Szabo Alina

    2012-01-01

    Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in ...

  19. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2013-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of management systems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of

  20. Integrated Natural Resource Management in the Highlands of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    1 janv. 2012 ... Integrated Natural Resource Management in the Highlands of Eastern Africa: ... goal of implementing an integrated approach to natural resource ... and the International Water Management Institute in Addis Ababa, Ethiopia.

  1. Integrated Natural Resource Management in the Highlands of ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2012-01-01

    Jan 1, 2012 ... Book cover Integrated Natural Resource Management in the ... with the common goal of implementing an integrated approach to natural resource ... and the International Water Management Institute in Addis Ababa, Ethiopia.

  2. Concept of operations : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-06-01

    This concept of operations (Con Ops) for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US : Department of Transportation Integrated Corridor Management Initiative, which is an innovative research initiative ...

  3. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2011-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of managementsystems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of integrated

  4. Integrated nutrients management for 'desi' cotton

    International Nuclear Information System (INIS)

    Qazi, M.A.; Akram, M.; Ahmad, N.; Khattak, M.A.

    2007-01-01

    Intensive cropping with no return of crop residues and other organic inputs result in the loss of soil organic matter (SOM) and nutrient supply in (Desi) cotton-wheat cropping system in Pakistan. For appraisal of problem and finding solution to sustainability, we evaluated six treatments comprised of two fertilizer doses and three management techniques over a period of three years (2003-05) monitoring their effects on seed cotton yield and soil fertility. The techniques included chemical fertilizers, municipal solid waste manure (MSWM) integrated with chemical fertilizers in 1:4 ratios with, and without pesticides. The results revealed that cotton yields. Were enhanced by 19% due to site-specific fertilizer dose over conventional dose. Ignoring weeds control by means of herbicided application resulted in 5% decrease of seed cotton yield in IPNM technique positive effect of MSWM integration was noted on soil test phosphorus and SOM. Site-specific fertilizer application and integrated plant nutrient management by MSWM proved their suitability as the techniques not only improve soil quality in terms of sustained levels of organic matter and phosphorus but also provide a safe way of waste disposal. (author)

  5. Towards integrated catchment management, Whaingaroa, New Zealand.

    Science.gov (United States)

    van Roon, M; Knight, S

    2001-01-01

    The paper examines progress towards integrated catchment management and sustainable agriculture at Whaingaroa (Raglan), New Zealand. Application of the Canadian "Atlantic Coastal Action Program" model (ACAP) has been only partially successful within New Zealand's bicultural setting. Even before the introduction of the ACAP process there existed strong motivation and leadership by various sectors of the community. A merging of resource management planning and implementation processes of the larger community and that of the Maori community has not occurred. Research carried out by Crown Research Institutes has clearly shown the actions required to make pastoral farming more sustainable. There are difficulties in the transference to, and uptake of, these techniques by farmers. An examination of the socio-economic context is required. There has been a requirement on local government bodies to tighten their focus as part of recent reform. This has occurred concurrently with a widening of vision towards integrated and sustainable forms of management. This (as well as a clear belief in empowerment of local communities) has lead to Council reliance on voluntary labour. There is a need to account for the dynamic interaction between social and political history and the geological and biophysical history of the area. As part of a re-examination of sustainable development, New Zealand needs to reconcile the earning of the bulk of its foreign income from primary production, with the accelerating ecological deficit that it creates. A sustainability strategy is required linking consumer demand, property rights and responsibilities.

  6. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  7. Integrated Global Nuclear Materials Management Preliminary Concepts

    International Nuclear Information System (INIS)

    Jones, E; Dreicer, M.

    2006-01-01

    The world is at a turning point, moving away from the Cold War nuclear legacy towards a future global nuclear enterprise; and this presents a transformational challenge for nuclear materials management. Achieving safety and security during this transition is complicated by the diversified spectrum of threat 'players' that has greatly impacted nonproliferation, counterterrorism, and homeland security requirements. Rogue states and non-state actors no longer need self-contained national nuclear expertise, materials, and equipment due to availability from various sources in the nuclear market, thereby reducing the time, effort and cost for acquiring a nuclear weapon (i.e., manifestations of latency). The terrorist threat has changed the nature of military and national security requirements to protect these materials. An Integrated Global Nuclear Materials Management (IGNMM) approach would address the existing legacy nuclear materials and the evolution towards a nuclear energy future, while strengthening a regime to prevent nuclear weapon proliferation. In this paper, some preliminary concepts and studies of IGNMM will be presented. A systematic analysis of nuclear materials, activities, and controls can lead to a tractable, integrated global nuclear materials management architecture that can help remediate the past and manage the future. A systems approach is best suited to achieve multi-dimensional and interdependent solutions, including comprehensive, end-to-end capabilities; coordinated diverse elements for enhanced functionality with economy; and translation of goals/objectives or standards into locally optimized solutions. A risk-informed basis is excellent for evaluating system alternatives and performances, and it is especially appropriate for the security arena. Risk management strategies--such as defense-in-depth, diversity, and control quality--help to weave together various technologies and practices into a strong and robust security fabric. Effective

  8. Water management as a key component of integrated weed management

    Directory of Open Access Journals (Sweden)

    Antonio Berti

    2010-09-01

    Full Text Available Water management within the cropping system is a key factor for an integrated weed management. Soil moisture affects seed persistence and seed dormancy, thus influencing their germination, the establishment of seedlings as well as the competition at adult stage and the number, vitality and dormancy of the new seeds produced by the weeds. The interactions among water availability and competition are very complex and still not fully understood. A research effort in this sector should the be very relevant for the development of new approaches of weed management, such as “Ecological weed management”, aiming to reduce weed density and competitiveness and, in the medium term, to prevent undesired modifications of the weed flora.

  9. Data integration for management of pipeline system integrity

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Anne A. de; Miranda, Ivan Vicente Janvrot; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil); Guimaraes, Frederico S; Magalhaes, Joao Alfredo P [Minds at Work, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The need to easily access pipeline information and the increasing number of inspections using distinct techniques from different vendors makes the use of systems in the Integrity Management Program indispensable. For this reason, MOPI has been developed by two Brazilian companies, Pipeway Engenharia in partnership with Minds at Work. This tool allows data recording from the design, construction and operation of the pipeline, the storage of documents, the comparison between the results of different inspections, the planning inspections, contracts and maintenance of the pipeline. Furthermore, the information registered in the system can be accessed by a network user without limitation of time or number of users. This work presents the main details and features of MOPI. (author)

  10. Rocket Testing and Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando; Schmalzel, John

    2005-01-01

    Integrated System Health Management (ISHM) describes a set of system capabilities that in aggregate perform: determination of condition for each system element, detection of anomalies, diagnosis of causes for anomalies, and prognostics for future anomalies and system behavior. The ISHM should also provide operators with situational awareness of the system by integrating contextual and timely data, information, and knowledge (DIaK) as needed. ISHM capabilities can be implemented using a variety of technologies and tools. This chapter provides an overview of ISHM contributing technologies and describes in further detail a novel implementation architecture along with associated taxonomy, ontology, and standards. The operational ISHM testbed is based on a subsystem of a rocket engine test stand. Such test stands contain many elements that are common to manufacturing systems, and thereby serve to illustrate the potential benefits and methodologies of the ISHM approach for intelligent manufacturing.

  11. Strategic Environmental Assessment: Integrated environmental management

    CSIR Research Space (South Africa)

    Department of Environmental Affairs and Tourism

    2004-01-01

    Full Text Available stream_source_info Department of Environmental Affairs and Tourism_2004.pdf.txt stream_content_type text/plain stream_size 70155 Content-Encoding ISO-8859-1 stream_name Department of Environmental Affairs and Tourism_2004.pdf... and Tourism Other topics in the series of overview information documents on the concepts of, and approaches to, integrated environmental management are listed below. Further titles in this series are being prepared and will be made available periodically...

  12. FEMA's Integrated Emergency Management Information System (IEMIS)

    International Nuclear Information System (INIS)

    Jaske, R.T.; Meitzler, W.

    1987-01-01

    FEMA is implementing a computerized system for use in optimizing planning, and for supporting exercises of these plans. Called the Integrated Emergency Management Information System (IEMIS), it consists of a base geographic information system upon which analytical models are superimposed in order to load data and report results analytically. At present, it supports FEMA's work in offsite preparedness around nuclear power stations, but is being developed to deal with a full range of natural and technological accident hazards for which emergency evacuation or population movement is required

  13. Integrate offsites management with information systems

    Energy Technology Data Exchange (ETDEWEB)

    Valleur, M. (TECHNIP, Paris (France))

    1993-11-01

    Computerized offsites management systems in oil refineries offer a unique opportunity to integrate advanced technology into a coherent refinery information system that contributes to benefits-driven optimal operations: from long-term, multirefinery linear programming (LP) models to sequential control of transfer lineups in the tank farm. There are strong incentives to automate and optimize the offsites operations, and benefits can be quantified to justify properly sized projects. The paper discusses the following: business opportunities, oil movement and advanced technology, project scoping and sizing, review of functional requirements, transfer automation, blending optimal control, on-line analyzers, oil movement and scheduling, organizational issues, and investment and benefits analysis.

  14. Integrated solid waste management of Seattle, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the City of Seattle, Washington, integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. Actual data from records kept by participants is reported in this document. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may perform manipulation or further analysis of the data. As such, the report is a reference document for MSW management professionals who are interested in the actual costs and energy consumption for a one-year period, of an operating IMSWM systems.

  15. Integrated solid waste management of Minneapolis, Minnesota

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the City of Minneapolis, Minnesota (Hennepin County) integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. Actual data from records kept by participants is reported in this document. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may perform manipulation or further analysis of the data. As such, the report is a reference document for municipal solid waste (MSW) management professionals who are interested in the actual costs and energy consumption for a one-year period, of an operating IMSWM system.

  16. Integrated solid waste management of Sevierville, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the City of Sevierville, Tennessee integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. Actual data from records kept by participants is reported in this document. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may perform manipulation or further analysis of the data. As such, the report is a reference document for MSW management professionals who are interested in the actual costs and energy consumption for a one-year period, of an operating IMSWM systems.

  17. Partnership - the heart of integrated outage management

    International Nuclear Information System (INIS)

    Robinson, F.T.

    1995-01-01

    Changes in the power generating industry continue apace. The effects of privatisation are widely visible: nowhere more so than in the growing national and international competition facing the generators around the world. A successful, long-term marriage between generator and contractor on power station outage management offers significant scope for cost reduction, shortening annual plant downtime and generating more megawatts, all within a safety environment of continuous improvement. Working in close partnership, Nuclear Electric and Rolls-Royce Nuclear Engineering Services have remodelled the whole contractor/client strategy. The new discipline, known as integrated outage management and partnering, is already producing shorter outage periods at Bradwell, a Magnox Station in Essex. (author)

  18. RISK MANAGEMENT: AN INTEGRATED APPROACH TO RISK MANAGEMENT AND ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Szabo Alina

    2012-12-01

    Full Text Available Purpose: The objective of this paper is to offer an overview over risk management cycle by focusing on prioritization and treatment, in order to ensure an integrated approach to risk management and assessment, and establish the ‘top 8-12’ risks report within the organization. The interface with Internal Audit is ensured by the implementation of the scoring method to prioritize risks collected from previous generated risk report. Methodology/approach: Using evidence from other research in the area and the professional expertise, this article outlines an integrated approach to risk assessment and risk management reporting processes, by separating the risk in two main categories: strategic and operational risks. The focus is on risk prioritization and scoring; the final output will comprise a mix of strategic and operational (‘top 8-12’ risks, which should be used to establish the annual Internal Audit plan. Originality/value: By using an integrated approach to risk assessment and risk management will eliminate the need for a separate Internal Audit risk assessment over prevailing risks. It will reduce the level of risk assessment overlap by different functions (Tax, Treasury, Information System over the same risk categories as a single methodology, is used and will align timings of risk assessment exercises. The risk prioritization by usage of risk and control scoring criteria highlights the combination between financial and non-financial impact criteria allowing risks that do not naturally lend themselves to a financial amount to be also assessed consistently. It is emphasized the usage of score method to prioritize the risks included in the annual audit plan in order to increase accuracy and timelines.

  19. Integrated solid waste management in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Cohen, A.S. [CSI Resource Systems, Boston, MA (United States)

    1993-12-31

    The Japanese, through a combination of public policy, private market conditions, and geographic necessity, practice integrated municipal solid waste management as defined by the US Environmental Protection Agency. The Japanese have not defined a specific hierarchical preference for alternative waste management practices, i.e., waste reduction, reuse and recycling, combustion, composting, and landfill disposal. However, in marked contrast to the US approach, the Japanese system relies heavily on waste combustion, with and without energy recovery. {open_quotes}Discards{close_quotes}, as the term is used in this paper, refers to all materials considered used and spent by residential and commercial generators. That which is discarded (whether recyclable or nonrecyclable) by a municipality is referred to as MSW. This paper provides an overview of MSW management practices and private-sector recycling in Japan. Estimates of the total generation of residential and commercial discards and their disposition are also presented. Such an overview of Japanese practices can be used to assess the potential effectiveness of US integrated solid waste management programs. Of the estimated 61.3 to 72.1 million tons of residential and commercial discards generated in Japan during its 1989 fiscal year (April 1, 1989, through March 31, 1990), an estimated 55 to 64 percent was incinerated; 15 to 28 percent was recycled (only 2 to 3 percent through municipal recycling activities); less than 0.1 percent was composted or used as animal feed; and 17 to 20 percent was landfilled. Including ash disposal, 26 to 30 percent, by weight, of the gross discards were landfilled.

  20. Integrated water resources management using engineering measures

    Science.gov (United States)

    Huang, Y.

    2015-04-01

    The management process of Integrated Water Resources Management (IWRM) consists of aspects of policies/strategies, measures (engineering measures and non-engineering measures) and organizational management structures, etc., among which engineering measures such as reservoirs, dikes, canals, etc., play the backbone that enables IWRM through redistribution and reallocation of water in time and space. Engineering measures are usually adopted for different objectives of water utilization and water disaster prevention, such as flood control and drought relief. The paper discusses the planning and implementation of engineering measures in IWRM of the Changjiang River, China. Planning and implementation practices of engineering measures for flood control and water utilization, etc., are presented. Operation practices of the Three Gorges Reservoir, particularly the development and application of regulation rules for flood management, power generation, water supply, ecosystem needs and sediment issues (e.g. erosion and siltation), are also presented. The experience obtained in the implementation of engineering measures in Changjiang River show that engineering measures are vital for IWRM. However, efforts should be made to deal with changes of the river system affected by the operation of engineering measures, in addition to escalatory development of new demands associated with socio-economic development.

  1. Integrated water resources management using engineering measures

    Directory of Open Access Journals (Sweden)

    Y. Huang

    2015-04-01

    Full Text Available The management process of Integrated Water Resources Management (IWRM consists of aspects of policies/strategies, measures (engineering measures and non-engineering measures and organizational management structures, etc., among which engineering measures such as reservoirs, dikes, canals, etc., play the backbone that enables IWRM through redistribution and reallocation of water in time and space. Engineering measures are usually adopted for different objectives of water utilization and water disaster prevention, such as flood control and drought relief. The paper discusses the planning and implementation of engineering measures in IWRM of the Changjiang River, China. Planning and implementation practices of engineering measures for flood control and water utilization, etc., are presented. Operation practices of the Three Gorges Reservoir, particularly the development and application of regulation rules for flood management, power generation, water supply, ecosystem needs and sediment issues (e.g. erosion and siltation, are also presented. The experience obtained in the implementation of engineering measures in Changjiang River show that engineering measures are vital for IWRM. However, efforts should be made to deal with changes of the river system affected by the operation of engineering measures, in addition to escalatory development of new demands associated with socio-economic development.

  2. Managing Uncertainty for an Integrated Fishery

    Directory of Open Access Journals (Sweden)

    MB Hasan

    2012-06-01

    Full Text Available This paper investigates ways to deal with the uncertainties in fishing trawler scheduling and production planning in a quota-based integrated commercial fishery. A commercial fishery faces uncertainty mainly from variation in catch rate, which may be due to weather, and other environmental factors. The firm tries to manage this uncertainty through planning co-ordination of fishing trawler scheduling, catch quota, processing and labour allocation, and inventory control. Scheduling must necessarily be done over some finite planning horizon, and the trawler schedule itself introduces man-made variability, which in turn induces inventory in the processing plant. This induced inventory must be managed, complicated by the inability to plan easily beyond the current planning horizon. We develop a surprisingly simple innovation in inventory, which we have not seen in other papers on production management, which of requiring beginning inventory to equal ending inventory. This tool gives management a way to calculate a profit-maximizing safety stock that counter-acts the man-made variability due to the trawler scheduling. We found that the variability of catch rate had virtually no effects on the profitability with inventory. We report numerical results for several planning horizon models, based on data for a major New Zealand fishery.

  3. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  4. Simplified Model for Evaluation of VIV-induced Fatigue Damage of Deepwater Marine Risers

    Institute of Scientific and Technical Information of China (English)

    XUE Hong-xiang; TANG Wen-yong; ZHANG Sheng-kun

    2009-01-01

    A simplified empirical model for fatigue analysis of deepwater marine risers due to vortex-induced vibration (VIV) in non-uniform current is presented. A simplified modal vibration equation is employed according to the characteristics of deepwater top tensioned risers. The response amplitude of each mode is determined by a balance between the energy feeding into the riser over the lock-in regions and the energy dissipated by the fluid damping over the remainder based on the data from self-excited oscillation and forced oscillation experiments of rigid cylinders. Multi-modal VIV fatigue loading is obtained by the square root of the sum of squares approach.Compared with previous works, this model can take fully account of the main intrinsic natures of VIV for low mass ratio structures on lock-in regions, added mass and nonlinear fluid damping. In addition, a closed form solution of fatigue damage is presented for the case of a riser with uniform mass and cross-section oscillating in a uniform flow. Fatigue analysis of a typical deepwater riser operating in Gulf of Mexico and West Africa shows that the current velocity profiles affect the riser's fatigue life significantly and the most dangerous locations of the riser are also pointed out.

  5. Climate change and integrated water resources management

    International Nuclear Information System (INIS)

    Bhuiyan, Nurul Amin

    2007-01-01

    Full text: Full text: In the Bangladesh Poverty Reduction Strategy (PRSP), Millennium Development Goals and other donor driven initiatives, two vital areas linked with poverty and ecosystem survival seem to be either missing or are being neglected: (a) transboundary water use and (b) coastal area poverty and critical ecosystems vulnerable due to climate change. Since the World Summit on Sustainable Development (WSSD) goals and PRSP are integrated, it is necessary that the countrys WSSD goals and PRSP should also be in harmony. All should give the recognition of Ganges Brahmaputra and Meghna as international basins and the approach should be taken for regional sustainable and integrated water resource management involving all co-riparian countries. The principle of low flow in the international rivers during all seasons should be ensured. All stakeholders should have a say and work towards regional cooperation in the water sector as a top priority. The energy sector should be integrated with water. The Indian River Linking project involving international rivers should be seriously discussed at all levels including the parliament so that voice of Bangladesh is concerted and information shared by all concerned. One of the most critical challenges Bangladesh faces is the management of water resources during periods of water excesses and acute scarcity. It is particularly difficult when only 7% of the catchments areas of the very international rivers, the Ganges, the Brahmaputra and the Meghna are in Bangladesh while 97% is outside Bangladesh where unfortunately, Bangladesh has no control on upstream diversion and water use. The UN Conference on Environment and Development in its Agenda 21 emphasizes the importance of Integrated Water Resource Management (IWRM). The core point of IWRM is that is development of all aspects of entire basin in a basin wide approach, that all relevant agencies of the government and water users must be involved in the planning process and

  6. Multiport riser and flange assemblies acceptance test report

    International Nuclear Information System (INIS)

    Precechtel, D.R.; Schroeder, B.K.

    1994-01-01

    This document presents the results of the acceptance test for the multiport riser (MPR) and multiport flange (MPF) assemblies. The accepted MPR and MPF assemblies will be used in support of the hydrogen mitigation project for double-shell waste tank 241-SY-101 and other related projects. The testing described in this document verifies that the mechanical and interface features are operating as designed and that the unit is ready for field service. The objectives of the acceptance testing were as follows: Basic equipment functions and mechanical interfaces were verified; Installation and removal of equipment were demonstrated to the degree possible; Operation of the decon spray system and all valving was confirmed; and the accumulated leak rate of the MPR and MPF assemblies was determined

  7. Two-riser system improves drilling at Auger prospect

    International Nuclear Information System (INIS)

    Gonzalez, R.; Marsh, G.L.; Ritter, P.B.; Mendel, P.E.

    1992-01-01

    This paper reports on a two-rise system (TRS) for drilling deepwater development wells which eliminates some of the limitations of conventional subsea technology and allows flexibility in well programs. Shell Offshore Inc.'s deep exploratory wells in Garden Banks 426 and 471 have encountered drilling problems that were attributed to limitations in casing sizes imposed by conventional subsea drilling systems. These problems are not uncommon in exploratory deepwater, deep well drilling in the Gulf of Mexico. Reservoir depths of up to 19,500 ft true vertical depth (TVD) and 7-in. production casing requirements led to potentially troublesome and expensive well plans. Because of the constraints placed on the development drilling program by completion requirements and directional drilling, a two-riser system was designed and fabricated. Solving such significant drilling problems has reduced overall development costs

  8. Clashing of risers due to vortex induced vibrations

    Energy Technology Data Exchange (ETDEWEB)

    Teissier, D. [Ecole Superieure d' Ingenieurs de Marseille (ESIM), 13 - Marseille (France)]|[Institut Francais du Petrole (IFP), 92 - Rueil-Malmaison (France); Scolan, Y.M. [Ecole Superieure d' Ingenieurs de Marseille (ESIM), 13 - Marseille (France); Fontaine, E. [Institut Francais du Petrole (IFP), 92 - Rueil-Malmaison (France)

    2004-07-01

    Phenomena such as Vortex Induced Vibrations can potentially damage offshore risers, especially in ar ay configurations. Due to wake interferences, amplification of VIV is observed leading to large displacements which are no more self limited to one di meter as in the case of VIV. In this context, clash ng becomes also an issue. In order to study this problems, Institut Francais du Petrole is developing a Computational Fluid Dynamics code, DeepFlow, devoted to the simulation of two-dimensional flows around risers. The extension to three-dimensional configurations follows from a strip theory for the fluid flow, coupled to a structural model for flexible pipes (DeepLines). The numerical method (Etienne s 1999) developed in DeepFlow allows to solve the two-dimensional Reynolds Averaged Navier-Stokes equations through a mixed representation (Eulerian and Lagrangian) of the flow properties: vorticity and turbulence. The Eulerian method is necessary in the close vicinity of the bodies in order to capture the boundary layer effects with accuracy, whereas the Lagrangian representation, based on a grid-less method is suitable for the flow in the wake. In the present pa-per, this approach is applied to study the flow around two freely moving cylinders. For this test case, there are some numerical results (Sagatum et al, 2002), however instabilities have been experimentally identified (Paidoussis et al, 1998; Zdravkovich, 1985, 2003). The approach has also been improved to solve accurately the interstitial flow when the bodies are very close to each other. Results from a Chimera approach are presented. (authors)

  9. Structural analysis of multiport riser 5A installation on tank 241SY101

    Energy Technology Data Exchange (ETDEWEB)

    Strehlow, J.P.

    1994-09-16

    The Tank 101-SY multiport riser assembly in the 241-SY-101 waste tank will replace the existing 42 inch riser with four smaller ports. Each smaller port can be used independently to access the tank interior with equipment and instruments needed to mitigate the concentration of hydrogen in the tank. This document provides a design report on the structural evaluation of the multiport riser assembly as well as its anchorage. The multiport riser assembly is a steel structure installed directly above the 42-inch riser and sealed at the existing riser flange. The assembly is structurally supported by the concrete pad placed around the 42 inch riser. The multiport riser assembly will provide two 8-inch penetrations, one 12-inch penetration and one 24-inch penetration. Each penetration will have a shielding plate. These penetrations will be used to insert equipment such as a sonic probe into the tank. In addition to normal loads, non-reactor Safety Class 1 structures, systems and components are to withstand the effects of extreme environmental loads including Design Basis Earthquake (DBE), Design Basis Wind (DBW), Design Basis Flood, Volcanic Eruptions and other abnormal loads considered on a case by case basis. Non-reactor Safety Class 2, 3 and 4 structures, systems and components are those that are not Safety Class 1 and are respectively specified as onsite safety related, occupational safety related and non-safety related items. The 241-SY-101 tank is considered as a non-reactor Safety Class 1 structure. The multiport riser assembly is considered as a non-reactor Safety Class 2 structure since it serves to contain the radioactive and toxic materials under normal operating conditions. However, the pressure relief doors provided on the assembly are considered as Safety Class 1 structures.

  10. Integrated Space Asset Management Database and Modeling

    Science.gov (United States)

    MacLeod, Todd; Gagliano, Larry; Percy, Thomas; Mason, Shane

    2015-01-01

    Effective Space Asset Management is one key to addressing the ever-growing issue of space congestion. It is imperative that agencies around the world have access to data regarding the numerous active assets and pieces of space junk currently tracked in orbit around the Earth. At the center of this issues is the effective management of data of many types related to orbiting objects. As the population of tracked objects grows, so too should the data management structure used to catalog technical specifications, orbital information, and metadata related to those populations. Marshall Space Flight Center's Space Asset Management Database (SAM-D) was implemented in order to effectively catalog a broad set of data related to known objects in space by ingesting information from a variety of database and processing that data into useful technical information. Using the universal NORAD number as a unique identifier, the SAM-D processes two-line element data into orbital characteristics and cross-references this technical data with metadata related to functional status, country of ownership, and application category. The SAM-D began as an Excel spreadsheet and was later upgraded to an Access database. While SAM-D performs its task very well, it is limited by its current platform and is not available outside of the local user base. Further, while modeling and simulation can be powerful tools to exploit the information contained in SAM-D, the current system does not allow proper integration options for combining the data with both legacy and new M&S tools. This paper provides a summary of SAM-D development efforts to date and outlines a proposed data management infrastructure that extends SAM-D to support the larger data sets to be generated. A service-oriented architecture model using an information sharing platform named SIMON will allow it to easily expand to incorporate new capabilities, including advanced analytics, M&S tools, fusion techniques and user interface for

  11. An optical sensor for the detection of leaks from subsea pipelines and risers

    International Nuclear Information System (INIS)

    McStay, D; Kerlin, J; Acheson, R

    2007-01-01

    An optical sensor for the rapid detection of detect leaks of oil, hydraulic fluids or leak detection chemicals from underwater pipelines and risers is reported. The sensor is designed to be deployed on ROVs or AUVs for the rapid survey of underwater pipelines and risers. The system employs ultra-bright LEDs to project a sensing light beam into the water to allow real time detection of ppm concentration plumes of material leaking from pipelines or riser in real time. Typically the system is deployed on an ROV which inspects a pipeline at a height of 2-3m

  12. Engineering study - installation of new risers in Single-Shell Tanks

    International Nuclear Information System (INIS)

    Magruder, W.J.

    1994-08-01

    A sampling program is being developed to characterize the 149 underground SSTs on the Hanford Site. The sampling effort will require access to the tank interior in a minimum of two locations per tank. Some of the risers suitable for sampling are either unavailable or are not in locations for proper characterization of the tank contents. Additional risers will be required in the SSTs to support the tank characterization sampling program. The purpose of this engineering study is to review alternatives for installation of new riser in the SSTs

  13. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  14. Integrated Work Management: FOD/RLM, Course 31882

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Lewis Edward [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-07

    The facility operations director (FOD) and responsible line manager (RLM) play leadership and functional roles in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: FOD/RLM (COURSE 31882), describes the IWM roles and responsibilities of the FOD and the RLM; it also discusses IWM requirements that must be met by the FOD and the RLM. Before taking this course, you may want to take COURSE 31881, Integrated Work Management: Overview. This self-study course would be particularly helpful if you are unfamiliar with the IWM process. You should also read Procedure (P) 300, Integrated Work Management. This course briefly covers the roles of the preparer and person in charge (PIC). For more in-depth instruction on the preparer’s role, see COURSE 31883, Integrated Work Management: Preparer. For instruction on the PIC’s role, see COURSE 31884, Integrated Work Management: PIC.

  15. Managing racial integration in South African public schools: In ...

    African Journals Online (AJOL)

    The paper explores what racial integration is. Furthermore, it scrutinises how racial integration is currently managed in South African Public schools. The main argument of the paper defends a deliberative conception of managing racial integration in South African public schools. In light of this, there is some form of hope to ...

  16. Integrated vector management: the Zambian experience.

    Science.gov (United States)

    Chanda, Emmanuel; Masaninga, Fred; Coleman, Michael; Sikaala, Chadwick; Katebe, Cecilia; Macdonald, Michael; Baboo, Kumar S; Govere, John; Manga, Lucien

    2008-08-27

    The Zambian Malaria Control Programme with the Roll Back Malaria (RBM) partners have developed the current National Malaria Strategic Plan (NMSP 2006-2011) which focuses on prevention based on the Integrated Vector Management (IVM) strategy. The introduction and implementation of an IVM strategy was planned in accordance with the World Health Organization (WHO) steps towards IVM implementation namely Introduction Phase, Consolidation Phase and Expansion Phase. IVM has created commitment for Legal and Regulatory policy review, monitoring, Research and a strong stewardship by the chemical suppliers. It has also leveraged additional resources, improved inter-sectoral collaboration, capacity building and enhanced community participation which facilitated a steady scaling up in coverage and utilisation of key preventive interventions. Thus, markedly reducing malaria incidence and case fatalities in the country. Zambia has successfully introduced, consolidated and expanded IVM activities. Resulting in increased coverage and utilization of interventions and markedly reducing malaria-related morbidity and mortality while ensuring a better protection of the environment.

  17. Integrated System Health Management (ISHM) and Autonomy

    Science.gov (United States)

    Figueroa, Fernando; Walker, Mark G.

    2018-01-01

    Systems capabilities on ISHM (Integrated System Health Management) and autonomy have traditionally been addressed separately. This means that ISHM functions, such as anomaly detection, diagnostics, prognostics, and comprehensive system awareness have not been considered traditionally in the context of autonomy functions such as planning, scheduling, and mission execution. One key reason is that although they address systems capabilities, both ISHM and autonomy have traditionally individually been approached as independent strategies and models for analysis. Additionally, to some degree, a unified paradigm for ISHM and autonomy has been difficult to implement due to limitations of hardware and software. This paper explores a unified treatment of ISHM and autonomy in the context of distributed hierarchical autonomous operations.

  18. Integrated pest management of "Golden Delicious" apples.

    Science.gov (United States)

    Simončič, A; Stopar, M; Velikonja Bolta, Š; Bavčar, D; Leskovšek, R; Baša Česnik, H

    2015-01-01

    Monitoring of plant protection product (PPP) residues in "Golden Delicious" apples was performed in 2011-2013, where 216 active substances were analysed with three analytical methods. Integrated pest management (IPM) production and improved IPM production were compared. Results were in favour of improved IPM production. Some active compounds determined in IPM production (boscalid, pyraclostrobin, thiacloprid and thiametoxam) were not found in improved IPM production. Besides that, in 2011 and 2012, captan residues were lower in improved IPM production. Risk assessment was also performed. Chronic exposure of consumers was low in general, but showed no major differences for IPM and improved IPM production for active substances determined in both types of production. Analytical results were compared with the European Union report of 2010 where 1.3% of apple samples exceeded maximum residue levels (MRLs), while MRL exceedances were not observed in this survey.

  19. The Management of Law Firms Using Business Process Management, Document Management and Web Services Integration

    OpenAIRE

    Roxana Maria Petculet

    2012-01-01

    The aim of this paper is to present the technical solution implemented in the present context for the management of law firms. The informational system consists of the automation of business processes using a BPM engine and electronic archiving using a DMS. The communication between the two modules is made by invoking web services. The whole system integrates modules like: project management, contract management, invoice management, collection, CRM, reporting.

  20. Integrated solid waste management of Scottsdale, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the city of Scottsdale, Arizona, integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. The document reports actual data from records kept by participants. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may per-form manipulation or further analysis of the data. As such, the report is a reference document for municipal solid waste (MSW) management professionals who are interested in the actual costs and energy consumption, for a 1-year period, of an operating IMSWM system. The report is organized into two main parts. The first part is the executive summary and case study portion of the report. The executive summary provides a basic description of the study area and selected economic and energy information. Within the case study are detailed descriptions of each component operating during the study period; the quantities of solid waste collected, processed, and marketed within the study boundaries; the cost of MSW in Scottsdale; an energy usage analysis; a review of federal, state, and local environmental requirement compliance; a reference section; and a glossary of terms. The second part of the report focuses on a more detailed discourse on the above topics. In addition, the methodology used to determine the economic costs and energy consumption of the system components is found in the second portion of this report. The methodology created for this project will be helpful for those professionals who wish to break out the costs of their own integrated systems.

  1. Energy efficiency through integrated environmental management.

    Science.gov (United States)

    Benromdhane, Souad Ahmed

    2015-05-01

    Integrated environmental management became an economic necessity after industrial development proved to be unsustainable without consideration of environmental direct and indirect impacts. Energy dependency and air pollution along with climate change grew into major challenges facing developed and developing countries alike. Thus, a new global market structure emerged and changed the way we do trade. The search intensified for alternatives to petroleum. However, scientists, policy makers, and environmental activists agreed to focus on strategic conservation and optimization of energy use. Environmental concerns will remain partially unaddressed with the current pace of consumption because greenhouse gas emissions will continue to rise with economic growth. This paper discusses energy efficiency, steady integration of alternative sources, and increased use of best available technologies. Energy criteria developed for environmental labeling certification are presented. Our intention is to encourage manufacturers and service providers to supply consumers with less polluting and energy-consuming goods and services, inform consumers of the environmental and energy impacts, and thereby instill sustainable and responsible consumption. As several programs were initiated in developed countries, environmental labeling requirements created barriers to many exports manufactured in developing countries, affecting current world trade and putting more pressure on countries to meet those requirements. Defining an institutional and legal framework of environmental labeling is a key challenge in implementing such programs for critical economic sectors like tourism, textiles, and food production where energy needs are the most important aspect to control. A case study of Tunisia and its experience with eco-labeling is presented.

  2. Integrated remotely sensed datasets for disaster management

    Science.gov (United States)

    McCarthy, Timothy; Farrell, Ronan; Curtis, Andrew; Fotheringham, A. Stewart

    2008-10-01

    Video imagery can be acquired from aerial, terrestrial and marine based platforms and has been exploited for a range of remote sensing applications over the past two decades. Examples include coastal surveys using aerial video, routecorridor infrastructures surveys using vehicle mounted video cameras, aerial surveys over forestry and agriculture, underwater habitat mapping and disaster management. Many of these video systems are based on interlaced, television standards such as North America's NTSC and European SECAM and PAL television systems that are then recorded using various video formats. This technology has recently being employed as a front-line, remote sensing technology for damage assessment post-disaster. This paper traces the development of spatial video as a remote sensing tool from the early 1980s to the present day. The background to a new spatial-video research initiative based at National University of Ireland, Maynooth, (NUIM) is described. New improvements are proposed and include; low-cost encoders, easy to use software decoders, timing issues and interoperability. These developments will enable specialists and non-specialists collect, process and integrate these datasets within minimal support. This integrated approach will enable decision makers to access relevant remotely sensed datasets quickly and so, carry out rapid damage assessment during and post-disaster.

  3. MAST's Integrated Data Access Management system: IDAM

    International Nuclear Information System (INIS)

    Muir, D.G.; Appel, L.; Conway, N.J.; Kirk, A.; Martin, R.; Meyer, H.; Storrs, J.; Taylor, D.; Thomas-Davies, N.; Waterhouse, J.

    2008-01-01

    A new Integrated Data Access Management system, IDAM, has been created to address specific data management issues of the MAST spherical Tokamak. For example, this system enables access to numerous file formats, both legacy and modern (IDA, Ufile, netCDF, HDF5, MDSPlus, PPF, JPF). It adds data quality values at the signal level, and automatically corrects for problems in data: in timings, calibrations, and labelling. It also builds new signals from signal components. The IDAM data server uses a hybrid XML-relational database to record how data are accessed, whether locally or remotely, and how alias and generic signal names are mapped to true names. Also, XML documents are used to encode the details of data corrections, as well as definitions of composite signals and error models. The simple, user friendly, API and accessor function library, written in C on Linux, is available for applications in C, C++, IDL and Fortran-90/95/2003 with good performance: a MAST plasma current trace (28 kbytes of data), requested using a generic name and with data corrections applied, is delivered over a 100 Mbit/s network in ∼13 ms

  4. Integrated Traffic Flow Management Decision Making

    Science.gov (United States)

    Grabbe, Shon R.; Sridhar, Banavar; Mukherjee, Avijit

    2009-01-01

    A generalized approach is proposed to support integrated traffic flow management decision making studies at both the U.S. national and regional levels. It can consider tradeoffs between alternative optimization and heuristic based models, strategic versus tactical flight controls, and system versus fleet preferences. Preliminary testing was accomplished by implementing thirteen unique traffic flow management models, which included all of the key components of the system and conducting 85, six-hour fast-time simulation experiments. These experiments considered variations in the strategic planning look-ahead times, the replanning intervals, and the types of traffic flow management control strategies. Initial testing indicates that longer strategic planning look-ahead times and re-planning intervals result in steadily decreasing levels of sector congestion for a fixed delay level. This applies when accurate estimates of the air traffic demand, airport capacities and airspace capacities are available. In general, the distribution of the delays amongst the users was found to be most equitable when scheduling flights using a heuristic scheduling algorithm, such as ration-by-distance. On the other hand, equity was the worst when using scheduling algorithms that took into account the number of seats aboard each flight. Though the scheduling algorithms were effective at alleviating sector congestion, the tactical rerouting algorithm was the primary control for avoiding en route weather hazards. Finally, the modeled levels of sector congestion, the number of weather incursions, and the total system delays, were found to be in fair agreement with the values that were operationally observed on both good and bad weather days.

  5. Pressured drilling riser design for drilling in ultra deep water with surface bop

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, J.; Morrison, D.; Efthymiou, M.; Lo, K.H. [Shell Global Solutions, 78 - Velizy Villacoublay (France); Magne, E.; Leach, C. [Shell Internationale Exploration and Production (Netherlands)

    2002-12-01

    In conventional drilling with a semi-submersible rig valuable rig time is used to run and retrieve the BOP and its accessories on the seabed, and this time increases with water depth. Furthermore, use of the conventional sub-sea BOP requires a large-diameter riser, which requires substantial rig storage and deck load capacity prior to installation. It also requires high riser-tensioning capacity or additional buoyancy. Thus as the water depth increases, it leads to a need for heavy duty 4. and 5. generation rigs with escalation in costs. The high cost of deep-water drill rigs is leading to the development of Surface BOP technology. In this development, the BOP is placed above sea level and the riser is simply a continuation of the casing (typical diameter 13-3/8''). This eliminates the need for a heavy 21'' riser and for running the BOP to the sea bed and retrieving it. Moreover, the reduced tension requirement for the smaller riser extends the water depth capability of 3. generation drilling semi-submersibles, enabling them to drill in deeper waters. A critical success factor for this development is the ability to design the riser/casing to withstand high internal pressures due to well kicks, in addition to environmental loads, and to restrict vessel offsets within certain limits so as not to overload the riser under the prevailing weather conditions. This paper addresses the design considerations of a pressured drilling riser that can be used with a surface BOP in deep-water. Key design issues that are sensitive to ultra-deep-water applications are discussed. The technical aspects of using (disposable) standard casing with threaded connector for the drilling riser are discussed, with a particular emphasis on the connector fatigue-testing program to quantify the stress concentration factor for fatigue design. Emerging composite material offers some alternatives to the steel riser when drilling in ultra-deep water Design issues related to the

  6. Integrated NPP life cycle management - Agency's approach

    International Nuclear Information System (INIS)

    Gueorguiev, B.

    2002-01-01

    Full text: The number of nuclear power plants (NPPs) operating in the world has been roughly constant for the past seven years. There are 438 reactors of 353,489 MW(e) capacity in the world and they generated 2448.9 TWh in 2001 giving a total world operating experience with nuclear power of 10,363 years. About 230 units have reached already over 15 years of operation and significant number of these plants are fully depreciated. Share of nuclear power in electricity production sector in Member States utilising nuclear power plants represents a meaningful amount and in 14 countries it exceeds 30%. Therefore, a loss of this share should be covered by new installed capacities either from conventional or alternative sources of electricity generation. Recent forecasts, for nuclear power use over the next two decades range from ∼350 to ∼500 GW(e) worldwide. While assessing the need for any nuclear power related programmes there are several important factors that must be considered since even 350 GW(e) is a very large programme requiring several hundred thousand highly qualified personnel and a substantial infrastructure to assure its continued safe, reliable and cost-effective operation. It is important to assure reliable, safe and economic beneficial performance of the plant, which requires in turn an appropriated management of any activity connected with any taken period of a plant life starting from design and ending by the decided mode of decommissioning. The period between the first and the last payment for the activities connected with the existence of a plant could be defined as a life cycle of the plant. Such integrated approach requires considering the life cycle of the plant in a much broader sense than just operational life and is characterized by the variety of activities and their management represents in a whole a plant life management programme (PLIM). Therefore PLIM could be defined as an aggregate (totality) of technical, financial, economical and

  7. Integrated vector management for malaria control

    Directory of Open Access Journals (Sweden)

    Impoinvil Daniel E

    2008-12-01

    Full Text Available Abstract Integrated vector management (IVM is defined as "a rational decision-making process for the optimal use of resources for vector control" and includes five key elements: 1 evidence-based decision-making, 2 integrated approaches 3, collaboration within the health sector and with other sectors, 4 advocacy, social mobilization, and legislation, and 5 capacity-building. In 2004, the WHO adopted IVM globally for the control of all vector-borne diseases. Important recent progress has been made in developing and promoting IVM for national malaria control programmes in Africa at a time when successful malaria control programmes are scaling-up with insecticide-treated nets (ITN and/or indoor residual spraying (IRS coverage. While interventions using only ITNs and/or IRS successfully reduce transmission intensity and the burden of malaria in many situations, it is not clear if these interventions alone will achieve those critical low levels that result in malaria elimination. Despite the successful employment of comprehensive integrated malaria control programmes, further strengthening of vector control components through IVM is relevant, especially during the "end-game" where control is successful and further efforts are required to go from low transmission situations to sustained local and country-wide malaria elimination. To meet this need and to ensure sustainability of control efforts, malaria control programmes should strengthen their capacity to use data for decision-making with respect to evaluation of current vector control programmes, employment of additional vector control tools in conjunction with ITN/IRS tactics, case-detection and treatment strategies, and determine how much and what types of vector control and interdisciplinary input are required to achieve malaria elimination. Similarly, on a global scale, there is a need for continued research to identify and evaluate new tools for vector control that can be integrated with

  8. Reliability-based dynamic positioning of floating vessels with riser and mooring system

    DEFF Research Database (Denmark)

    Fang, Shaoji; Leira, Bernt J.; Blanke, Mogens

    2011-01-01

    To maintain safety of a floating vessel with associated slender components such as risers and mooring line, the vessel is normally kept within a limited region. To specify a safe position in that region, this paper suggests a new position chasing algorithm with the consideration of both riser ang...... to their criticality. An optimal position set-point is produced by minimization of the value of the cost function. Numerical simulations show the effectiveness of the proposed algorithm....

  9. An experimental study on the key fretting variables for flexible marine risers

    OpenAIRE

    O’Halloran, S.M.; Harte, A.M.; Shipway, P.H.; Leen, S.B.

    2018-01-01

    This paper presents an experimental investigation into the effects of contact conformity, contact pressure and displacement amplitude on the gross-slip fretting behaviour grease-lubricated cylinder-on-flat contacts in the context of flexible marine riser pressure armour wire, and compares behaviour with that observed in unlubricated conditions. Characterisation of friction and wear is critical to fretting fatigue life prediction in flexible risers since friction directly controls trailing-edg...

  10. Simulation of inlet and outlet riser break sequences in the N Reactor

    International Nuclear Information System (INIS)

    Bolander, M.A.; Fletcher, C.D.

    1988-02-01

    This report documents work performed at the Idaho National Engineering Laboratory (INEL) in support of the Westinghouse Hanford Company safety analyses of the N Reactor. The RELAP5/MOD2 computer code was used in analyzing two hypothetical transients. The computer code was modified specifically to simulate the refill behavior in the N Reactor process tubes. The transients analyzed were a double-ended rupture of an inlet riser column and a double-ended rupture of an outlet riser column

  11. Weather information integration in transportation management center (TMC) operations.

    Science.gov (United States)

    2011-01-02

    This report presents the results of the third phase of an on-going FHWA study on weather integration in Transportation Management Center (TMC) operations. The report briefly describes the earlier phases of the integration study, summarizes the findin...

  12. Features of a time domain simulation tool for rigid riser design

    Energy Technology Data Exchange (ETDEWEB)

    Morooka, Celso K.; Brandt, Dustin M. [Universidade Estadual de Campinas (UNICAMP), SP (Brazil). Faculdade de Engenharia Mecanica. Dept. de Engenharia de Petroleo; Matt, Cyntia G.C.; Franciss, Ricardo [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil). Centro de Pesquisas

    2008-07-01

    This paper present a number of numerical implementations designed for the analysis of rigid riser's static and dynamic behavior that includes the effects of vortex induced vibrations (VIV) and marine hydrodynamic loads in time domain. Features include the ability to consider pipe with a free-span utilizing a soil/riser interaction model. An implementation of a numerical coupling scheme to couple the vertical riser and platform dynamics was developed to allow prediction of the sub sea Blow-Out Preventer (BOP) re-entry into a sub sea petroleum well when drilling different phases of deep and ultra-deep wells. The developments contains support for the consideration of the Self Standing Hybrid Riser (SSHR) configuration which has been shown to be a promising riser configuration in deep and ultra-deep waters. A graphical interface was also created to better grasp the results and aid in the modeling, processing and to help analyze the numerical simulations, contributing to enhance agility and quality of the riser design and analysis processes. (author)

  13. integrated identity and integrated identity and access management

    African Journals Online (AJOL)

    eobe

    Management System (T-IAMS) is a fingerprint biometric database that centrally manages students' identity, course a fingerprint ... registration, library and medical services information. .... based application and a web-based application.

  14. The integrity management cycle as a business process

    Energy Technology Data Exchange (ETDEWEB)

    Ackhurst, Trent B.; Peverelli, Romina P. [PIMS - Pipeline Integrity Management Specialists of London Ltd. (United Kingdom).

    2009-07-01

    It is a best-practice Oil and Gas pipeline integrity and reliability technique to apply integrity management cycles. This is conforms to the business principles of continuous improvement. This paper examines the integrity management cycle - both goals and objectives and subsequent component steps - from a business perspective. Traits that businesses require, to glean maximum benefit from such a cycle, are highlighted. A case study focuses upon an integrity and reliability process developed to apply to pipeline operators. installations. This is compared and contrasted to the pipeline integrity management cycle to underline both cycles. consistency with the principles of continuous improvement. (author)

  15. Integrated Weed Management Strategies for Control of Hydrilla

    National Research Council Canada - National Science Library

    Nelson, Linda S; Shearer, Judy F

    2009-01-01

    ...), and the fungal pathogen Mycoleptodiscus terrestris (Gerd.) Ostazeski, applied alone and in combination with one another, as an integrated weed management strategy against the nuisance aquatic plant, hydrilla...

  16. Integrated waste management - Looking beyond the solid waste horizon

    International Nuclear Information System (INIS)

    Seadon, J.K.

    2006-01-01

    Waste as a management issue has been evident for over four millennia. Disposal of waste to the biosphere has given way to thinking about, and trying to implement, an integrated waste management approach. In 1996 the United Nations Environmental Programme (UNEP) defined 'integrated waste management' as 'a framework of reference for designing and implementing new waste management systems and for analysing and optimising existing systems'. In this paper the concept of integrated waste management as defined by UNEP is considered, along with the parameters that constitute integrated waste management. The examples used are put into four categories: (1) integration within a single medium (solid, aqueous or atmospheric wastes) by considering alternative waste management options (2) multi-media integration (solid, aqueous, atmospheric and energy wastes) by considering waste management options that can be applied to more than one medium (3) tools (regulatory, economic, voluntary and informational) and (4) agents (governmental bodies (local and national), businesses and the community). This evaluation allows guidelines for enhancing success: (1) as experience increases, it is possible to deal with a greater complexity; and (2) integrated waste management requires a holistic approach, which encompasses a life cycle understanding of products and services. This in turn requires different specialisms to be involved in the instigation and analysis of an integrated waste management system. Taken together these advance the path to sustainability

  17. Integrating research with management: The case of Katavi National ...

    African Journals Online (AJOL)

    Integrating research with management: The case of Katavi National Park, Tanzania. ... national park: (i) reduced water flow caused by local damming of the Katuma River, ... to both management and policy makers for tackling these problems.

  18. Training plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-01-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  19. Test report : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  20. Final report : Dallas Integrated Corridor Management (ICM) Demonstration Project.

    Science.gov (United States)

    2015-08-01

    The Dallas Area Rapid Transit (DART) is leading the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  1. Project Management Data Retrieval and Integration (PMDRI) Application

    Data.gov (United States)

    Department of Veterans Affairs — The Project Management Data Retrieval and Integration Database (PMDRI) is a system that presents data from the VA Financial Management System(FMS) in a structured...

  2. Integrated Climate Smart Flood Management for Accra, Ghana ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · What we do ... The research team will use evidence to develop an integrated climate smart flood management framework to support policymaking. ... The Ministry of Environment, Science, Technology, and Innovation will manage the ...

  3. INTEGRATED WATERSHED MANAGEMENT: PRINCIPLES AND PRACTICE. Book Review

    Science.gov (United States)

    Through a wide range of information and topics, Integrated Watershed Management Principles and Practice shows how involved the watershed management planning process can be. The book is informative, and the author obviously has researched the subject thoroughly. The book's case...

  4. Integrated solid waste management: a palliative to existing waste ...

    African Journals Online (AJOL)

    As a concept, Integrated Solid Waste Management (ISWM) is a sustainable ... on the perspective of consumers on waste generation, collection and disposal. ... to effective solid waste management in the case study area; non-sorting and ...

  5. Roots Air Management System with Integrated Expander

    Energy Technology Data Exchange (ETDEWEB)

    Stretch, Dale [Eaton Corporation, Menomonee Falls, WI (United States); Wright, Brad [Eaton Corporation, Menomonee Falls, WI (United States); Fortini, Matt [Eaton Corporation, Menomonee Falls, WI (United States); Fink, Neal [Ballard Power Systems, Burnaby, BC (Canada); Ramadan, Bassem [Kettering Univ., Flint, MI (United States); Eybergen, William [Eaton Corporation, Menomonee Falls, WI (United States)

    2016-07-06

    PEM fuel cells remain an emerging technology in the vehicle market with several cost and reliability challenges that must be overcome in order to increase market penetration and acceptance. The DOE has identified the lack of a cost effective, reliable, and efficient air supply system that meets the operational requirements of a pressurized PEM 80kW fuel cell as one of the major technological barriers that must be overcome. This project leveraged Roots positive displacement development advancements and demonstrated an efficient and low cost fuel cell air management system. Eaton built upon its P-Series Roots positive displacement design and shifted the peak efficiency making it ideal for use on an 80kW PEM stack. Advantages to this solution include: • Lower speed of the Roots device eliminates complex air bearings present on other systems. • Broad efficiency map of Roots based systems provides an overall higher drive cycle fuel economy. • Core Roots technology has been developed and validated for other transportation applications. Eaton modified their novel R340 Twin Vortices Series (TVS) Roots-type supercharger for this application. The TVS delivers more power and better fuel economy in a smaller package as compared to other supercharger technologies. By properly matching the helix angle with the rotor’s physical aspect ratio, the supercharger’s peak efficiency can be moved to the operating range where it is most beneficial for the application. The compressor was designed to meet the 90 g/s flow at a pressure ratio of 2.5, similar in design to the P-Series 340. A net shape plastic expander housing with integrated motor and compressor was developed to significantly reduce the cost of the system. This integrated design reduced part count by incorporating an overhung expander and motor rotors into the design such that only four bearings and two shafts were utilized.

  6. Integrated Systems Health Management for Space Exploration

    Science.gov (United States)

    Uckun, Serdar

    2005-01-01

    Integrated Systems Health Management (ISHM) is a system engineering discipline that addresses the design, development, operation, and lifecycle management of components, subsystems, vehicles, and other operational systems with the purpose of maintaining nominal system behavior and function and assuring mission safety and effectiveness under off-nominal conditions. NASA missions are often conducted in extreme, unfamiliar environments of space, using unique experimental spacecraft. In these environments, off-nominal conditions can develop with the potential to rapidly escalate into mission- or life-threatening situations. Further, the high visibility of NASA missions means they are always characterized by extraordinary attention to safety. ISHM is a critical element of risk mitigation, mission safety, and mission assurance for exploration. ISHM enables: In-space maintenance and repair; a) Autonomous (and automated) launch abort and crew escape capability; b) Efficient testing and checkout of ground and flight systems; c) Monitoring and trending of ground and flight system operations and performance; d) Enhanced situational awareness and control for ground personnel and crew; e) Vehicle autonomy (self-sufficiency) in responding to off-nominal conditions during long-duration and distant exploration missions; f) In-space maintenance and repair; and g) Efficient ground processing of reusable systems. ISHM concepts and technologies may be applied to any complex engineered system such as transportation systems, orbital or planetary habitats, observatories, command and control systems, life support systems, safety-critical software, and even the health of flight crews. As an overarching design and operational principle implemented at the system-of-systems level, ISHM holds substantial promise in terms of affordability, safety, reliability, and effectiveness of space exploration missions.

  7. Integrated Water Resources Management: A Global Review

    Science.gov (United States)

    Srinivasan, V.; Cohen, M.; Akudago, J.; Keith, D.; Palaniappan, M.

    2011-12-01

    The diversity of water resources endowments and the societal arrangements to use, manage, and govern water makes defining a single paradigm or lens through which to define, prioritize and evaluate interventions in the water sector particularly challenging. Integrated Water Resources Management (IWRM) emerged as the dominant intervention paradigm for water sector interventions in the early 1990s. Since then, while many successful implementations of IWRM have been demonstrated at the local, basin, national and trans-national scales, IWRM has also been severely criticized by the global water community as "having a dubious record that has never been comprehensively analyzed", "curiously ambiguous", and "ineffective at best and counterproductive at worst". Does IWRM hold together as a coherent paradigm or is it a convenient buzzword to describe a diverse collection of water sector interventions? We analyzed 184 case study summaries of IWRM interventions on the Global Water Partnership (GWP) website. The case studies were assessed to find the nature, scale, objectives and outcomes of IWRM. The analysis does not suggest any coherence in IWRM as a paradigm - but does indicate distinct regional trends in IWRM. First, IWRM was done at very different scales in different regions. In Africa two-thirds of the IWRM interventions involved creating national or transnational organizations. In contrast, in Asia and South America, almost two-thirds were watershed, basin, or local body initiatives. Second, IWRM interventions involved very different types of activities in different regions. In Africa and Europe, IWRM entailed creation of policy documents, basin plans and institution building. In contrast, in Asia and Latin America the interventions were much more likely to entail new technology, infrastructure or watershed measures. In Australia, economic measures, new laws and enforcement mechanisms were more commonly used than anywhere else.

  8. Improve data integration performance by employing metadata management utility

    Energy Technology Data Exchange (ETDEWEB)

    Wei, M.; Sung, A.H. [New Mexico Petroleum Recovery Research Center, Socorro, NM (United States)

    2005-07-01

    This conference paper explored ways of integrating petroleum and exploration data obtained from different sources in order to provide more comprehensive data for various analysis purposes and to improve the integrity and consistency of integrated data. This paper proposes a methodology to enhance oil and gas industry data integration performance by cooperating data management utilities in Microsoft SQL Server database management system (DBMS) for small scale data integration without support of commercial software. By semi-automatically capturing metadata, data sources are investigated in detail, data quality problems are partially cleansed, and the performance of data integration is improved. 20 refs., 7 tabs., 1 fig.

  9. [Application of supply chain integration management of medical consumables].

    Science.gov (United States)

    Zhang, Jian

    2013-07-01

    This paper introduces the background, the content, the information management system of material supply chain integration management and the consumables management process. The system helps to expand the selection of hospital supplies varieties, to reduce consumables management costs, to improve the efficiency of supplies, to ensure supplies safety, reliability and traceability.

  10. Development of integrated analytical data management system

    International Nuclear Information System (INIS)

    Onishi, Koichi; Wachi, Isamu; Hiroki, Toshio

    1986-01-01

    The Analysis Subsection of Technical Service Section, Tokai Reprocessing Plant, Tokai Works, is engaged in analysis activities required for the management of processes and measurements in the plant. Currently, it has been desired to increase the reliability of analytical data and to perform analyses more rapidly to cope with the increasing number of analysis works. To meet this end, on-line data processing has been promoted and advanced analytical equipment has been introduced in order to enhance automization. In the present study, an integrated analytical data mangement system is developed which serves for improvement of reliability of analytical data as well as for rapid retrieval and automatic compilation of these data. Fabrication of a basic model of the system has been nearly completed and test operation has already been started. In selecting hardware to be used, examinations were made on easiness of system extension, Japanese language processing function for improving man-machine interface, large-capacity auxiliary memory system, and data base processing function. The existing analysis works wer reviewed in establishing the basic design of the system. According to this basic design, the system can perform such works as analysis of application slips received from clients as well as recording, sending, filing and retrieval of analysis results. (Nogami, K.)

  11. Integrated vector management: The Zambian experience

    Directory of Open Access Journals (Sweden)

    Katebe Cecilia

    2008-08-01

    Full Text Available Abstract Background The Zambian Malaria Control Programme with the Roll Back Malaria (RBM partners have developed the current National Malaria Strategic Plan (NMSP 2006–2011 which focuses on prevention based on the Integrated Vector Management (IVM strategy. The introduction and implementation of an IVM strategy was planned in accordance with the World Health Organization (WHO steps towards IVM implementation namely Introduction Phase, Consolidation Phase and Expansion Phase. Achievements IVM has created commitment for Legal and Regulatory policy review, monitoring, Research and a strong stewardship by the chemical suppliers. It has also leveraged additional resources, improved inter-sectoral collaboration, capacity building and enhanced community participation which facilitated a steady scaling up in coverage and utilisation of key preventive interventions. Thus, markedly reducing malaria incidence and case fatalities in the country. Conclusion Zambia has successfully introduced, consolidated and expanded IVM activities. Resulting in increased coverage and utilization of interventions and markedly reducing malaria-related morbidity and mortality while ensuring a better protection of the environment.

  12. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  13. How to inspect platform risers: an effective approach and new challenges

    International Nuclear Information System (INIS)

    Agthoven, Robert van

    2007-01-01

    Ageing risers on offshore platforms, designed and built several decades ago, were until recently hard to inspect or not inspectable at all. This was due to their layout or ID geometry changes prohibiting the use of product propelled intelligent pigs, which are frequently used, on long distance pipelines. Growing concerns about reliability and safety, as well as environmental pressure, are the impetus for operators of offshore platforms to check the condition of the risers, which until now could not be inspected. This paper describes a few solutions to enter these 'non-inspect-able' risers to check their condition by using special small diameter cable operated tools. These new miniature cable tools are spin-offs from the well-known cable (tether, umbilical) tools introduced more than two decades ago by RTD for the inspection of (off)-loading lines. The first generation gravity driven small diameter riser inspection tools were designed to inspect the vertical section of the riser only. On-going development has resulted in a second generation of riser inspection tools which can now enter a few hundred metres into the horizontal connecting pipeline on the sea-floor by using a small, but powerful, crawler. With this ability these tools are the only solution for riser-pipes and relatively short connecting pipelines which terminate at a T-or Y-connection in the vicinity of the platform. All riser inspection tools apply ultrasonics to quantify wall thickness and corrosion. A novel TOFD (Time Of Flight Diffraction) module can be applied as an option to inspect in the circumferential weld area. All cable tools have a reinforced cable, which is used for tool control and retrieval. A strong advantage of these cable tools is that they provide on-line results and allow on-site evaluation. Since the introduction of these new tools considerable experience has been gained. The history of development and several typical cases of applications are given in this paper. In addition

  14. Integrated Data Management Processes Expedite Common Data Management Tasks in Autism Research

    OpenAIRE

    Farach, Frank; Sinanis, Naralys; Hawthorne, Julie; Agnew, Henry; Schantz, Tricia; Jensen, Bill; Rozenblit, Leon

    2013-01-01

    We compare the efficiency of (1) just-in-time data management, in which data are cleaned prior to each analysis, and (2) integrated data management, in which data are centralized, cleaned up front, and made available via a query interface. Integrated data management was associated with faster completion of data management requests.

  15. Integrated, regional approach to risk management of industrial systems

    International Nuclear Information System (INIS)

    Chakraborty, S.

    1992-01-01

    This paper focuses on the following four main issues: (1) necessity for an integrated, regional approach to risk management of industrial systems; (2) principles of risk management; (3) integrated approach and overall methodology; and (4) implementation of risk management strategies on a regional basis. The U.N. Interagency project on risk management for large industrial areas, which is a pioneer type of international initiative for an integrated approach to risk management, is discussed in this context. Another encouraging activity for further development of overall methodologies for risk management is the ongoing project on the risk and safety of technical systems at the Swiss Federal Institute of Technology in Aurich. The concept of integral risk management takes into account multidimensional factors including technical, economic, political, social, and ethical considerations to allow a well-balanced decision-making process

  16. Integrating Medical Supply as Part of the Army's Single Integrated Materiel Manager Concept--Why or why Not?

    National Research Council Canada - National Science Library

    Baxter, Shelia

    1998-01-01

    .... To achieve the goal of seamless logistics integration capabilities, one concept is to establish a Single Integrated Materiel Manager for the Army which envisions integrating all such functions...

  17. Integrated management system: expedience and organizational aspects

    Directory of Open Access Journals (Sweden)

    Trunova Ekaterina Viktorovna

    2011-06-01

    Full Text Available The correctly lined up management system is an important element of intellectual capital of company and promotes growth of its market value. In the article grounded, that realization of strategy is impossible without intercommunication of strategic management and business-process management. Such organizational aspects of administrative activity, as role conception of management, strategic office and process office, are observed.

  18. Analysis of the effects of corrosion probe on riser 241-AN-102-WST-16 during seismic event

    International Nuclear Information System (INIS)

    ZIADA, H.H.

    1998-01-01

    This analysis supports the installation activity of the corrosion probe in Tank 241-AN-102. The probe is scheduled to be installed in Riser 241-AN-102-WST-16 (formerly known as Riser 15B). The purpose of this analysis is to evaluate the potential effect of the corrosion probe on the riser during a credible seismic event. The previous analysis (HNF 1997a) considered only pump jet impingement loading

  19. Law for the Integral Management of Waste No. 8839

    International Nuclear Information System (INIS)

    2010-01-01

    The Law for Integral Waste Management No. 8839 was enacted in Costa Rica in 2010. The purpose of this law has been to regulate the integral management of residues and the efficient use of the resources, through the planning and execution of regulatory actions, operational, financial, administrative, educational, environmental and healthy of monitoring and evaluation [es

  20. Integrated Rural-Urban Water Management for Climate Based ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    There are serious short- and long-term consequences on human health, physical assets, economic ... To work, adaptive climate-proof integrated urban water management must extend throughout the whole catchment, an approach known as integrated water resource management. ... Careers · Contact Us · Site map.

  1. The nexus between integrated natural resources management and integrated water resources management in southern Africa

    Science.gov (United States)

    Twomlow, Stephen; Love, David; Walker, Sue

    The low productivity of smallholder farming systems and enterprises in the drier areas of the developing world can be attributed mainly to the limited resources of farming households and the application of inappropriate skills and practices that can lead to the degradation of the natural resource base. This lack of development, particularly in southern Africa, is of growing concern from both an agricultural and environmental perspective. To address this lack of progress, two development paradigms that improve land and water productivity have evolved, somewhat independently, from different scientific constituencies. One championed by the International Agricultural Research constituency is Integrated Natural Resource Management (INRM), whilst the second championed predominantly by Environmental and Civil Engineering constituencies is Integrated Water Resources Management (IWRM). As a result of similar objectives of working towards the millennium development goals of improved food security and environmental sustainability, there exists a nexus between the constituencies of the two paradigms, particularly in terms of appreciating the lessons learned. In this paper lessons are drawn from past INRM research that may have particular relevance to IWRM scientists as they re-direct their focus from blue water issues to green water issues, and vice-versa. Case studies are drawn from the management of water quality for irrigation, green water productivity and a convergence of INRM and IWRM in the management of gold panning in southern Zimbabwe. One point that is abundantly clear from both constituencies is that ‘one-size-fits-all’ or silver bullet solutions that are generally applicable for the enhancement of blue water management/formal irrigation simply do not exist for the smallholder rainfed systems.

  2. Integrated management system laying a foundation for excellence

    Energy Technology Data Exchange (ETDEWEB)

    Brissette, S.; Vincent, D. [Bruce Power, Tiverton, Ontario (Canada)], E-mail: Derek.VINCENT@brucepower.com

    2009-07-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  3. Integrated management system laying a foundation for excellence

    International Nuclear Information System (INIS)

    Brissette, S.; Vincent, D.

    2009-01-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  4. Basic principles, contents, and benefits of an integrated management system

    International Nuclear Information System (INIS)

    Schwarzin, Juergen

    2010-01-01

    The basic principles and contents of an integrated management system are presented. The report focuses on the benefits and the experience accumulated in using an integrated management system. Integrated management systems are characterized by 2 features in particular: - On the one hand, by a system holistically controlling and describing all processes within a company which are necessary to achieve the company policy and company goals as defined. - On the other hand, it combines in one integrated management system various different aspects (such as quality, environmental protection, and safety) and the resulting requirements. Successful implementation of an integrated management system requires a clear commitment by company management to the integrated management system serving as a management tool. Implementation must be assigned the appropriate importance in the company. It must not be viewed as an instrument preserving 'status quo.' Instead, it must be seen as a tool for long-term improvement of the company. Application of the integrated management system minimizes the probability of occurrence of events, but is not able to reduce it to zero. (orig.)

  5. CANDU plant life management - An integrated approach

    International Nuclear Information System (INIS)

    Charlebois, P.; Hart, R.S.; Hopkins, J.R.

    1998-01-01

    Commercial versions of CANDU reactors were put into service starting more than 25 years ago. The first unit of Ontario Hydro's Pickering A station was put into service in 1971, and Bruce A in 1977. Most CANDU reactors, however, are only now approaching their mid-life of 15 to 20 years of operation. In particular, the first series of CANDU 6 plants which entered service in the early 1980's were designed for a 30 year life and are now approaching mid life. The current CANDU 6 design is based on a 40 year life as a result of advancement in design and materials through research and development. In order to assure safe and economic operation of these reactors, a comprehensive CANDU Plant Life Management (PLIM) program is being developed from the knowledge gained during the operation of Ontario Hydro's Pickering, Bruce, and Darlington stations, worldwide information from CANDU 6 stations, CANDU research and development programs, and other national and international sources. This integration began its first phase in 1994, with the identification of most of the critical systems structures and components in these stations, and a preliminary assessment of degradation and mechanisms that could affect their fitness for service for their planned life. Most of these preliminary assessments are now complete, together with the production of the first iteration of Life Management Plans for several of the systems and components. The Generic CANDU 6 PLIM program is now reaching its maturity, with formal processes to systematically identify and evaluate the major CSSCs in the station, and a plan to ensure that the plant surveillance, operation, and maintenance programs monitor and control component degradation well within the original design specifications essential for the plant life attainment. A Technology Watch program is being established to ensure that degradation mechanisms which could impact on plant life are promptly investigated and mitigating programs established. The

  6. Validation of mathematical models to describe fluid dynamics of a cold riser by gamma ray attenuation

    International Nuclear Information System (INIS)

    Melo, Ana Cristina Bezerra Azedo de

    2004-12-01

    The fluid dynamic behavior of a riser in a cold type FCC model was investigated by means of catalyst concentration distribution measured with gamma attenuation and simulated with a mathematical model. In the riser of the cold model, MEF, 0,032 m in diameter, 2,30 m in length the fluidized bed, whose components are air and FCC catalyst, circulates. The MEF is operated by automatic control and instruments for measuring fluid dynamic variables. An axial catalyst concentration distribution was measured using an Am-241 gamma source and a NaI detector coupled to a multichannel provided with a software for data acquisition and evaluation. The MEF was adapted for a fluid dynamic model validation which describes the flow in the riser, for example, by introducing an injector for controlling the solid flow in circulation. Mathematical models were selected from literature, analyzed and tested to simulate the fluid dynamic of the riser. A methodology for validating fluid dynamic models was studied and implemented. The stages of the work were developed according to the validation methodology, such as data planning experiments, study of the equations which describe the fluidodynamic, computational solvers application and comparison with experimental data. Operational sequences were carried out keeping the MEF conditions for measuring catalyst concentration and simultaneously measuring the fluid dynamic variables, velocity of the components and pressure drop in the riser. Following this, simulated and experimental values were compared and statistical data treatment done, aiming at the required precision to validate the fluid dynamic model. The comparison tests between experimental and simulated data were carried out under validation criteria. The fluid dynamic behavior of the riser was analyzed and the results and the agreement with literature were discussed. The adopt model was validated under the MEF operational conditions, for a 3 to 6 m/s gas velocity in the riser and a slip

  7. Development and characterization of composite materials for production of composite risers by filament winding

    Directory of Open Access Journals (Sweden)

    Ledjane Lima Sobrinho

    2011-09-01

    Full Text Available Industry has been challenged to provide riser systems which are more cost effective and which can fill the technology gaps with respect to water depth, riser diameter and high temperatures left open by flexibles, steel catenary risers (SCRs and hybrid risers. Composite materials present advantages over conventional steel risers because composite materials are lighter, more fatigue and corrosion resistant, better thermal insulators and can be designed for improving the structural and mechanical response. This paper contains a study of the toughening mechanism of an epoxy resin under rubber addition by means of fractographic analysis and its relation with the fracture process and increase of strength of a composite riser employing this polymeric matrix. Initially, an epoxy resin system was toughened by rubber CTBN addition (10 wt. (% as a way of improving the flexibility of future risers. Mechanical and thermal analyses were carried out for characterizing the polymeric systems. Later, composite tubes were prepared and mechanically characterized. The influence of matrix toughening on the mechanical behavior of the tubes was also studied. Split-disk tests were used to determine the hoop tensile strength of these specimens. The results indicate that the matrix plays an important role in composite fracture processes. The adding rubber to the polymeric matrix promoted a simultaneous increase of stress and elongation at fracture of the tubes manufactured herein, which is not often reported. These results, probably, is function of better adhesion between fibers and polymeric matrix observed in the CTBN-modified composite rings, which was evidenced in the fractografic analysis by SEM after the split-disk tests.

  8. IM (Integrity Management) software must show flexibility to local codes

    Energy Technology Data Exchange (ETDEWEB)

    Brors, Markus [ROSEN Technology and Research Center GmbH (Germany); Diggory, Ian [Macaw Engineering Ltd., Northumberland (United Kingdom)

    2009-07-01

    There are many internationally recognized codes and standards, such as API 1160 and ASME B31.8S, which help pipeline operators to manage and maintain the integrity of their pipeline networks. However, operators in many countries still use local codes that often reflect the history of pipeline developments in their region and are based on direct experience and research on their pipelines. As pipeline companies come under increasing regulatory and financial pressures to maintain the integrity of their networks, it is important that operators using regional codes are able to benchmark their integrity management schemes against these international standards. Any comprehensive Pipeline Integrity Management System (PIMS) software package should therefore not only incorporate industry standards for pipeline integrity assessment but also be capable of implementing regional codes for comparison purposes. This paper describes the challenges and benefits of incorporating one such set of regional pipeline standards into ROSEN Asset Integrity Management Software (ROAIMS). (author)

  9. SIRSALE: integrated video database management tools

    Science.gov (United States)

    Brunie, Lionel; Favory, Loic; Gelas, J. P.; Lefevre, Laurent; Mostefaoui, Ahmed; Nait-Abdesselam, F.

    2002-07-01

    Video databases became an active field of research during the last decade. The main objective in such systems is to provide users with capabilities to friendly search, access and playback distributed stored video data in the same way as they do for traditional distributed databases. Hence, such systems need to deal with hard issues : (a) video documents generate huge volumes of data and are time sensitive (streams must be delivered at a specific bitrate), (b) contents of video data are very hard to be automatically extracted and need to be humanly annotated. To cope with these issues, many approaches have been proposed in the literature including data models, query languages, video indexing etc. In this paper, we present SIRSALE : a set of video databases management tools that allow users to manipulate video documents and streams stored in large distributed repositories. All the proposed tools are based on generic models that can be customized for specific applications using ad-hoc adaptation modules. More precisely, SIRSALE allows users to : (a) browse video documents by structures (sequences, scenes, shots) and (b) query the video database content by using a graphical tool, adapted to the nature of the target video documents. This paper also presents an annotating interface which allows archivists to describe the content of video documents. All these tools are coupled to a video player integrating remote VCR functionalities and are based on active network technology. So, we present how dedicated active services allow an optimized video transport for video streams (with Tamanoir active nodes). We then describe experiments of using SIRSALE on an archive of news video and soccer matches. The system has been demonstrated to professionals with a positive feedback. Finally, we discuss open issues and present some perspectives.

  10. Space station operations task force. Panel 4 report: Management integration

    Science.gov (United States)

    1987-01-01

    The Management Integration Panel of the Space Station Operations Task Force was chartered to provide a structure and ground rules for integrating the efforts of the other three panels and to address a number of cross cutting issues that affect all areas of space station operations. Issues addressed include operations concept implementation, alternatives development and integration process, strategic policy issues and options, and program management emphasis areas.

  11. Dynamic management of integrated residential energy systems

    Science.gov (United States)

    Muratori, Matteo

    dissertation presents a bottom-up highly resolved model of a generic residential energy eco-system in the United States. The model is able to capture the entire energy footprint of an individual household, to include all appliances, space conditioning systems, in-home charging of plug-in electric vehicles, and any other energy needs, viewing residential and transportation energy needs as an integrated continuum. The residential energy eco-system model is based on a novel bottom-up approach that quantifies consumer energy use behavior. The incorporation of stochastic consumer behaviors allows capturing the electricity consumption of each residential specific end-use, providing an accurate estimation of the actual amount of available controllable resources, and for a better understanding of the potential of residential demand response programs. A dynamic energy management framework is then proposed to manage electricity consumption inside each residential energy eco-system. Objective of the dynamic energy management framework is to optimize the scheduling of all the controllable appliances and in-home charging of plug-in electric vehicles to minimize cost. Such an automated energy management framework is used to simulate residential demand response programs, and evaluate their impact on the electric power infrastructure. For instance, time-varying electricity pricing might lead to synchronization of the individual residential demands, creating pronounced rebound peaks in the aggregate demand that are higher and steeper than the original demand peaks that the time-varying electricity pricing structure intended to eliminate. The modeling tools developed in this study can serve as a virtual laboratory for investigating fundamental economic and policy-related questions regarding the interplay of individual consumers with energy use. The models developed allow for evaluating the impact of different energy policies, technology adoption, and electricity price structures on the total

  12. CORPORATIVE MOTIVES ON IMPLEMENTATION OF INTEGRATED MANAGEMENT SYSTEM (IMS

    Directory of Open Access Journals (Sweden)

    Dragan Rajkovic

    2009-09-01

    Full Text Available Integration of management systems for quality, environment, health and risk management as well as corporative social responsibilities is workable corporative approach to reduce costs, effective use of resources, higher motivation of employees and better fulfillment of requirements of social engagements and stakeholders. This paper presents contents of literature and review of a company motives on integrated management system (IMS implementation, namely factors affecting the IMS implementation.

  13. Using remote sensing to inform integrated coastal zone management

    CSIR Research Space (South Africa)

    Roberts, W

    2010-06-01

    Full Text Available TO INFORM INTERGRATED COASTAL ZONE MANAGEMENT GISSA Western Cape Regional Meeting Wesley Roberts & Melanie Luck-Vogel 2 June 2010 CSIR NRE Ecosystems Earth Observation Group What is Integrated Coastal Zone Management? Integrated coastal management... D1D1 B a n d 1 Band 2 Quick theory of CVA Magnitude Direction ( ) ( )22 xaxbyaybM ?+?= Quadrant 1 (++) Accretion Quadrant 2 (-+) Quadrant 4 (+-) Quadrant 3 (--) Erosion CVA Results & Conclusions ? Change in image time series...

  14. Ergonomics Integration Omproving Production Process Management in Enterprises of Latvia

    OpenAIRE

    Henrijs Kaļķis

    2013-01-01

    Dotoral thesis ERGONOMICS INTEGRATION IMPROVING PRODUCTION PROCESS MANAGEMENT IN ENTERPRISES OF LATVIA ANNOTATION Ergonomics integration in process management has great significance in organisations` growth of productivity. It is a new approach to entrepreneurship and business strategy, where ergonomic aspects and values are taken into account in ensuring the effective process management and profitability of enterprises. This study is aimed at solution of the problem of e...

  15. Theoretical framework of integrated strategic performance management system

    OpenAIRE

    Mitrović, Zorica; Todorović, Marija; Bjelica, Dragan

    2015-01-01

    The aim of this paper is to present a conceptual model of the integrated strategic performance management system. This model is conceptual framework designed as a result of research that shows significant benefits of integrated application of strategic management and performance management in organizations. The framework consists of five steps: establishing a planning system, establishing of performance measurement system, establishing an accountability system, establishing of the knowledge m...

  16. Developing Tribal Integrated Waste Management Plans

    Science.gov (United States)

    An IWMP outlines how the tribe will reduce, manage, and dispose of its waste. It identifies existing waste systems, assesses needs, and sets forth the ways to design, implement, and monitor a more effective and sustainable waste management program.

  17. Integrated Facilities Management and Fixed Asset Accounting.

    Science.gov (United States)

    Golz, W. C., Jr.

    1984-01-01

    A record of a school district's assets--land, buildings, machinery, and equipment--can be a useful management tool that meets accounting requirements and provides appropriate information for budgeting, forecasting, and facilities management. (MLF)

  18. Pipeline integrity handbook risk management and evaluation

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Based on over 40 years of experience in the field, Ramesh Singh goes beyond corrosion control, providing techniques for addressing present and future integrity issues. Pipeline Integrity Handbook provides pipeline engineers with the tools to evaluate and inspect pipelines, safeguard the life cycle of their pipeline asset and ensure that they are optimizing delivery and capability. Presented in easy-to-use, step-by-step order, Pipeline Integrity Handbook is a quick reference for day-to-day use in identifying key pipeline degradation mechanisms and threats to pipeline integrity. The book begins

  19. Flow Mapping in a Gas-Solid Riser via Computer Automated Radioactive Particle Tracking (CARPT)

    Energy Technology Data Exchange (ETDEWEB)

    Muthanna Al-Dahhan; Milorad P. Dudukovic; Satish Bhusarapu; Timothy J. O' hern; Steven Trujillo; Michael R. Prairie

    2005-06-04

    Statement of the Problem: Developing and disseminating a general and experimentally validated model for turbulent multiphase fluid dynamics suitable for engineering design purposes in industrial scale applications of riser reactors and pneumatic conveying, require collecting reliable data on solids trajectories, velocities ? averaged and instantaneous, solids holdup distribution and solids fluxes in the riser as a function of operating conditions. Such data are currently not available on the same system. Multiphase Fluid Dynamics Research Consortium (MFDRC) was established to address these issues on a chosen example of circulating fluidized bed (CFB) reactor, which is widely used in petroleum and chemical industry including coal combustion. This project addresses the problem of lacking reliable data to advance CFB technology. Project Objectives: The objective of this project is to advance the understanding of the solids flow pattern and mixing in a well-developed flow region of a gas-solid riser, operated at different gas flow rates and solids loading using the state-of-the-art non-intrusive measurements. This work creates an insight and reliable database for local solids fluid-dynamic quantities in a pilot-plant scale CFB, which can then be used to validate/develop phenomenological models for the riser. This study also attempts to provide benchmark data for validation of Computational Fluid Dynamic (CFD) codes and their current closures. Technical Approach: Non-Invasive Computer Automated Radioactive Particle Tracking (CARPT) technique provides complete Eulerian solids flow field (time average velocity map and various turbulence parameters such as the Reynolds stresses, turbulent kinetic energy, and eddy diffusivities). It also gives directly the Lagrangian information of solids flow and yields the true solids residence time distribution (RTD). Another radiation based technique, Computed Tomography (CT) yields detailed time averaged local holdup profiles at

  20. Research on Integration of NPP Operational Safety Management Performance Systems

    International Nuclear Information System (INIS)

    Chi, Miao; Shi, Liping

    2014-01-01

    The operational safety management of Nuclear Power Plants demands systematic planning and integrated control. NPPs are following the well-developed safety indicator systems proposed by IAEA Operational Safety Performance Indicator Programme, NRC Reactor Oversight Process or the other institutions. Integration of the systems is proposed to benefiting from the advantages of both systems and avoiding improper application into the real world. The authors analyzed the possibility and necessity for system integration, and propose an indicator system integrating method

  1. ESG Integration and the Investment Management Process : Fundamental Investing Reinvented

    NARCIS (Netherlands)

    van Duuren, Emiel; Plantinga, Auke; Scholtens, Bert

    2016-01-01

    We investigate how conventional asset managers account for environmental, social and governance factors (ESG) in their investment process. We do so on the basis of an international survey among fund managers. We find that many conventional managers integrate responsible investing in their investment

  2. Evolution of river management: up to integrated and beyond?

    NARCIS (Netherlands)

    Straatsma, M.W.; Nooij, R.J.W. de

    2010-01-01

    Integrated river management is heralded as the new style of river management, but it has been preceded by a number of previous styles, and is unlikely to be the last. This article presents the first analysis of the evolution of river management using Spiral Dynamics (SD). SD provides a growth

  3. INTEGRATED SAFETY MANAGEMENT SYSTEM IN AIR TRAFFIC SERVICES

    Directory of Open Access Journals (Sweden)

    Volodymyr Kharchenko

    2014-06-01

    Full Text Available The article deals with the analysis of the researches conducted in the field of safety management systems.Safety management system framework, methods and tools for safety analysis in Air Traffic Control have been reviewed.Principles of development of Integrated safety management system in Air Traffic Services have been proposed.

  4. Numerical Simulation of the Vortex-Induced Vibration of A Curved Flexible Riser in Shear Flow

    Science.gov (United States)

    Zhu, Hong-jun; Lin, Peng-zhi

    2018-06-01

    A series of fully three-dimensional (3D) numerical simulations of flow past a free-to-oscillate curved flexible riser in shear flow were conducted at Reynolds number of 185-1015. The numerical results obtained by the two-way fluid-structure interaction (FSI) simulations are in good agreement with the experimental results reported in the earlier study. It is further found that the frequency transition is out of phase not only in the inline (IL) and crossflow (CF) directions but also along the span direction. The mode competition leads to the non-zero nodes of the rootmean- square (RMS) amplitude and the relatively chaotic trajectories. The fluid-structure interaction is to some extent reflected by the transverse velocity of the ambient fluid, which reaches the maximum value when the riser reaches the equilibrium position. Moreover, the local maximum transverse velocities occur at the peak CF amplitudes, and the values are relatively large when the vibration is in the resonance regions. The 3D vortex columns are shed nearly parallel to the axis of the curved flexible riser. As the local Reynolds number increases from 0 at the bottom of the riser to the maximum value at the top, the wake undergoes a transition from a two-dimensional structure to a 3D one. More irregular small-scale vortices appeared at the wake region of the riser, undergoing large amplitude responses.

  5. Validation Plan of Turbulence Models for Internal Gas Flow Analysis in a Heated Rectangular Riser Duct

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sin-Yeob; Shin, Dong-Ho; Park, Goon-Cherl; Cho, Hyoung Kyu [Seoul National Univ., Seoul (Korea, Republic of); Kim, Chan-Soo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    VHTR being developed at Korea Atomic Energy Research Institute adopts an air-cooled Reactor Cavity Cooling System (RCCS) incorporating rectangular riser channels to remove the afterheat emitted from the reactor vessel. Because the performance of RCCS is determined by heat removal rate through the RCCS riser, it is important to understand the heat transfer phenomena in the RCCS riser to ensure the safety of the reactor. In the mixed convection, due to the buoyance force induced by temperature and density differences, local flow structure and heat transfer mode near the heated wall have significantly dissimilar characteristics from both forced convection and free convection. In this study, benchmark calculation was conducted to reproduce the previous statements that V2F turbulence model can capture the mixed convection phenomena with the Shehata's experimental data. Then, the necessity of the model validation for the mixed convection phenomena was confirmed with the CFD analyses for the geometry of the prototype RCCS riser. For the purpose of validating the turbulence models for mixed convection phenomena in the heated rectangular riser duct, validation plan with three experimental tests was introduced. Among them, the flow visualization test facility with preserved cross-section geometry was introduced and a preliminary test result was shown.

  6. Fluid dynamics characterization of riser in a FCC cold flow model using gas radiotracer

    International Nuclear Information System (INIS)

    Santos, Valdemir A. dos; Lima, Emerson A.O.

    2013-01-01

    Was carried out the characterization of a diameter small riser of a cold flow model of a circulating fluidized bed (CFB), with aid of a radioactive tracer. Compressed air and catalytic cracking of petroleum flow through solids pneumatic transport regime, made of transparent material (glass, acrylic, PVC, polycarbonate) for study of problems in Fluid Catalytic Cracking (FCC) unit and development of methods of measurement of fluid dynamic parameters. The CFB model consisted of a mixer component solid-gas (compressed air at 25 deg C and 200 kN/m 2 ; cracking catalyst with an average diameter of 72μm and specific mass of 1,500 kg/m 3 ), comprising a riser pipe glass 0.02m internal diameter and 1.8m height, a gas solid separation vessel by flash effect, with the filter in the gas outlet, and a return column (a glass tube with an internal diameter of 0.0254m) to redirect the catalyst for the riser base. Recorded data allowed studies on residence time distribution of the gaseous phase in the riser, with the identification and characterization of the flow of gas-solid components in the CFB riser of small diameter. A plug flow type with deviations due to back mixing of catalyst close to the walls, associated with the density difference between this component was observed. (author)

  7. Damage localization of marine risers using time series of vibration signals

    Science.gov (United States)

    Liu, Hao; Yang, Hezhen; Liu, Fushun

    2014-10-01

    Based on dynamic response signals a damage detection algorithm is developed for marine risers. Damage detection methods based on numerous modal properties have encountered issues in the researches in offshore oil community. For example, significant increase in structure mass due to marine plant/animal growth and changes in modal properties by equipment noise are not the result of damage for riser structures. In an attempt to eliminate the need to determine modal parameters, a data-based method is developed. The implementation of the method requires that vibration data are first standardized to remove the influence of different loading conditions and the autoregressive moving average (ARMA) model is used to fit vibration response signals. In addition, a damage feature factor is introduced based on the autoregressive (AR) parameters. After that, the Euclidean distance between ARMA models is subtracted as a damage indicator for damage detection and localization and a top tensioned riser simulation model with different damage scenarios is analyzed using the proposed method with dynamic acceleration responses of a marine riser as sensor data. Finally, the influence of measured noise is analyzed. According to the damage localization results, the proposed method provides accurate damage locations of risers and is robust to overcome noise effect.

  8. Total Ore Processing Integration and Management

    Energy Technology Data Exchange (ETDEWEB)

    Leslie Gertsch

    2006-05-15

    This report outlines the technical progress achieved for project DE-FC26-03NT41785 (Total Ore Processing Integration and Management) during the period 01 January through 31 March of 2006. (1) Work in Progress: Minntac Mine--Graphical analysis of drill monitor data moved from two-dimensional horizontal patterns to vertical variations in measured and calculated parameters. The rock quality index and the two dimensionless ({pi}) indices developed by Kewen Yin of the University of Minnesota are used by Minntac Mine to design their blasts, but the drill monitor data from any given pattern is obviously not available for the design of that shot. Therefore, the blast results--which are difficult to quantify in a short time--must be back-analyzed for comparison with the drill monitor data to be useful for subsequent blast designs. {pi}{sub 1} indicates the performance of the drill, while {pi}{sub 2} is a measure of the rock resistance to drilling. As would be expected, since a drill tends to perform better in rock that offers little resistance, {pi}{sub 1} and {pi}{sub 2} are strongly inversely correlated; the relationship is a power function rather than simply linear. Low values of each Pi index tend to be quantized, indicating that these two parameters may be most useful above certain minimum magnitudes. (2) Work in Progress: Hibtac Mine--Statistical examination of a data set from Hibtac Mine (Table 1) shows that incorporating information on the size distribution of material feeding from the crusher to the autogenous mills improves the predictive capability of the model somewhat (43% vs. 44% correlation coefficient), but a more important component is production data from preceding days (26% vs. 44% correlation coefficient), determined using exponentially weighted moving average predictive variables. This lag effect likely reflects the long and varied residence times of the different size fragments in the grinding mills. The rock sizes are also correlated with the geologic

  9. Supply chain integration, risk management and manufacturing flexibility

    DEFF Research Database (Denmark)

    Chaudhuri, Atanu; Boer, Harry; Taran, Yariv

    2018-01-01

    , respectively, and manufacturing flexibility. Design/methodology/approach – Using hierarchical regression, data are analyzed from a sample of 343 manufacturing plants in Asia collected in 2013-2014 as part of the International Manufacturing Strategy Survey (IMSS VI). Findings – Internal integration and supply......Purpose – The purpose of this paper is to investigate the impact of internal integration, external integration and supply chain risk management on manufacturing flexibility, and the moderating effect of supply chain risk management on the relationships between internal and external integration...... chain risk management have a direct effect on manufacturing flexibility. Supply chain risk management moderates the relationship between external integration and flexibility. Research limitations/implications – Further research is needed to generalize beyond the flexibility performance of discrete...

  10. QUANTITATIVE СHARACTERISTICS OF COMPLEMENTARY INTEGRATED HEALTH CARE SYSTEM AND INTEGRATED MEDICATION MANAGEMENT INFORMATION SYSTEM

    Directory of Open Access Journals (Sweden)

    L. Yu. Babintseva

    2015-05-01

    i mportant elements of state regulation of the pharmaceutical sector health. For the first time creation of two information systems: integrated medication management infor mation system and integrated health care system in an integrated medical infor mation area, operating based on th e principle of complementarity was justified. Global and technological coefficients of these systems’ functioning were introduced.

  11. Integrated Space Asset Management Database and Modeling

    Science.gov (United States)

    Gagliano, L.; MacLeod, T.; Mason, S.; Percy, T.; Prescott, J.

    The Space Asset Management Database (SAM-D) was implemented in order to effectively track known objects in space by ingesting information from a variety of databases and performing calculations to determine the expected position of the object at a specified time. While SAM-D performs this task very well, it is limited by technology and is not available outside of the local user base. Modeling and simulation can be powerful tools to exploit the information contained in SAM-D. However, the current system does not allow proper integration options for combining the data with both legacy and new M&S tools. A more capable data management infrastructure would extend SAM-D to support the larger data sets to be generated by the COI. A service-oriented architecture model will allow it to easily expand to incorporate new capabilities, including advanced analytics, M&S tools, fusion techniques and user interface for visualizations. Based on a web-centric approach, the entire COI will be able to access the data and related analytics. In addition, tight control of information sharing policy will increase confidence in the system, which would encourage industry partners to provide commercial data. SIMON is a Government off the Shelf information sharing platform in use throughout DoD and DHS information sharing and situation awareness communities. SIMON providing fine grained control to data owners allowing them to determine exactly how and when their data is shared. SIMON supports a micro-service approach to system development, meaning M&S and analytic services can be easily built or adapted. It is uniquely positioned to fill this need as an information-sharing platform with a proven track record of successful situational awareness system deployments. Combined with the integration of new and legacy M&S tools, a SIMON-based architecture will provide a robust SA environment for the NASA SA COI that can be extended and expanded indefinitely. First Results of Coherent Uplink from a

  12. Supply Chain Management and Sustainability: Procrastinating Integration in Mainstream Research

    Directory of Open Access Journals (Sweden)

    Marisa P. de Brito

    2010-03-01

    Full Text Available Research has pointed out opportunities and research agendas to integrate sustainability issues with supply chain and operations management. However, we find that it is still not mainstream practice to systematically take a sustainability approach in tackling supply chain and operations management issues. In this paper, we make use of behavioral theory to explain the current lack of integration. We conclude through abductive reasoning that the reasons for procrastinating integration of sustainability in supply chain and operations management research are the conflicting nature of the task and the inherent context, which is the focus on operations rather than environmental or social issues.

  13. Integrative learning for practicing adaptive resource management

    Directory of Open Access Journals (Sweden)

    Craig A. McLoughlin

    2015-03-01

    Full Text Available Adaptive resource management is a learning-by-doing approach to natural resource management. Its effective practice involves the activation, completion, and regeneration of the "adaptive management cycle" while working toward achieving a flexible set of collaboratively identified objectives. This iterative process requires application of single-, double-, and triple-loop learning, to strategically modify inputs, outputs, assumptions, and hypotheses linked to improving policies, management strategies, and actions, along with transforming governance. Obtaining an appropriate balance between these three modes of learning has been difficult to achieve in practice and building capacity in this area can be achieved through an emphasis on reflexive learning, by employing adaptive feedback systems. A heuristic reflexive learning framework for adaptive resource management is presented in this manuscript. It is built on the conceptual pillars of the following: stakeholder driven adaptive feedback systems; strategic adaptive management (SAM; and hierarchy theory. The SAM Reflexive Learning Framework (SRLF emphasizes the types, roles, and transfer of information within a reflexive learning context. Its adaptive feedback systems enhance the facilitation of single-, double-, and triple-loop learning. Focus on the reflexive learning process is further fostered by streamlining objectives within and across all governance levels; incorporating multiple interlinked adaptive management cycles; having learning as an ongoing, nested process; recognizing when and where to employ the three-modes of learning; distinguishing initiating conditions for this learning; and contemplating practitioner mandates for this learning across governance levels. The SRLF is a key enabler for implementing the "adaptive management cycle," and thereby translating the theory of adaptive resource management into practice. It promotes the heuristics of adaptive management within a cohesive

  14. Managing Quadrennial Defense Review Integration: An Overview

    National Research Council Canada - National Science Library

    Schrader, John

    2001-01-01

    ...). The lessons learned from the 1997 Quadrennial Defense Review (QDR 1997) included the need for leadership guidance and integration of analytic activities to sort through the myriad issues that are always confronting the Department of Defense...

  15. Armenia : Towards Integrated Water Resources Management

    OpenAIRE

    World Bank

    2001-01-01

    The objective of this paper is to examine the challenges in the water sector faced by Armenia today, and outline options for management and allocation of its water resources in the future, considering the need for a stable, transparent apublic sector management framework and sustainable resource use for long-term private investment and job creation, and for appropriate balances among water...

  16. An integrated approach to plant life management

    International Nuclear Information System (INIS)

    Fredlund, L.

    1998-01-01

    Plant life is no longer determined by components, almost everything can be replaced. A plant life management program should aim at actions and replacements being performed at the right time. In order to manage this there is need for experience feedback systems, a plant specific risk study and safety upgrades. (author)

  17. Pesticides and public health: integrated methods of mosquito management.

    OpenAIRE

    Rose, R. I.

    2001-01-01

    Pesticides have a role in public health as part of sustainable integrated mosquito management. Other components of such management include surveillance, source reduction or prevention, biological control, repellents, traps, and pesticide-resistance management. We assess the future use of mosquito control pesticides in view of niche markets, incentives for new product development, Environmental Protection Agency registration, the Food Quality Protection Act, and improved pest management strate...

  18. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  19. Integrated Management System Incorporating Quality Management and Management of Environment, Health and Occupational Safety

    International Nuclear Information System (INIS)

    Manchev, B.; Nenkova, B.; Tomov, E.

    2012-01-01

    Risk Engineering Ltd is a Bulgarian private company founded in 1990 to provide engineering and consulting services applicable to each and every field of the energy sector. Since its establishment Risk Engineering Ltd develops, implement and apply a System for quality assurance, certified for the first time by BVQI (now Bureau Veritas Certification) in 1999 for conformity with the standard ISO 9001:1994. Later on, in connection with the revision of the standards of ISO 9000 series and introduction of the standard ISO 9001:2000 a Quality Management System in conformity with the standard ISO 9001:2000 was developed, introduced and certified. At present, Risk Engineering Ltd has got developed, documented, introduced and certified by Lloyd's Register Quality Assurance (LRQA) Quality Management System in compliance with ISO 9001:2008 on the process approach basis. On this basis and including the requirements of the ISO 14001:2004 (regarding the environment) and OHSAS 18001:2007 (regarding the health and occupational safety), Risk Engineering Ltd has developed and introduced Integrated Management System aim at achieving and demonstrating good results regarding protection of the environment, health and occupational safety. The processes under control by the Integrated Management System and applicable at the company are divided in two general types: A) Management processes: Strategic management and Management of the human resources. B) Processes describing the main activities: design/development process; project management; management of industrial projects and technical infrastructure project; construction, installation, repair and operation of power industry facilities; commercial activities and marketing; investigation of energy efficiency of industrial systems and certification of buildings regarding energy efficiency; consulting activity in the field of industry and energy as well as consultant in accordance with the Law of the Spatial Planning; management of the

  20. Model of a catalytic injection in a riser by means of gamma ray transmission measurements

    Energy Technology Data Exchange (ETDEWEB)

    Moura, Alex E.; Brito, Macio F.P.; Dantas, Carlos C.; Melo, Silvio B., E-mail: alex.emoura@ufpe.br, E-mail: sbm@ufpe.br [Universidade Federal de Pernambuco (DEN/UFPE), Recife, PE (Brazil); Barbosa, Enivaldo S., E-mail: Enivaldo.santos@ufcg.edu.br [Universidade Federal de Campina Grande (UFCG), PB (Brazil). Departamento de Engenharia Mecanica; Lima, Emerson A.O., E-mail: eal@poli.br [Universidade de Pernambuco, Recife, PE (Brazil). Departamento de Matematica

    2015-07-01

    In Gas solid process involving a solid circulation through a closed loop the knowledge of the Solids Circulation Rate (SCR) is fundamental to control and improve the operation of a circulating fluidized bed system. A valve controls the circulation rate of solids in the riser of a fluid catalytic cracking unit. Initially, to control the catalyst injection in the riser, a rotary valve controlled and measured solid flow injection, but with a limited working time. Due to the fine powder catalyst abrasive action on the valve steel axis, this device stop work. A lab made valve were design to avoiding direct contact of the catalyst with mechanical moving parts in while control solid injection in riser, but do not measure the solid flow like the rotary valve. To control the lab made device a fixed pressure measurement at riser bottom is provided by control setup which corresponds to a given mass/time solid injection. In the present work, we proposed a method to evaluate the control valve based on a non-invasive technique. With gamma ray transmission measurements, in a cross section of the pipe, we developed a model that was used in the control system of the Cold Pilot Unit (CPU). Therefore, the interaction of the gamma ray with solid flow in riser should yield the necessary information for the process control system. A first model approximation consider the solid flow rate injection and solid velocity in riser as proposed in literature. In the CPU control system a Programmable Logic Controller-PLC keeps steady state processing the airflow, pressure profile and solid flow inputs. Additionally to preexisting PLC platform, some LabVIEW algorithms were implemented to achieve a good system performance operational condition. (author)

  1. Model of a catalytic injection in a riser by means of gamma ray transmission measurements

    International Nuclear Information System (INIS)

    Moura, Alex E.; Brito, Macio F.P.; Dantas, Carlos C.; Melo, Silvio B.; Barbosa, Enivaldo S.; Lima, Emerson A.O.

    2015-01-01

    In Gas solid process involving a solid circulation through a closed loop the knowledge of the Solids Circulation Rate (SCR) is fundamental to control and improve the operation of a circulating fluidized bed system. A valve controls the circulation rate of solids in the riser of a fluid catalytic cracking unit. Initially, to control the catalyst injection in the riser, a rotary valve controlled and measured solid flow injection, but with a limited working time. Due to the fine powder catalyst abrasive action on the valve steel axis, this device stop work. A lab made valve were design to avoiding direct contact of the catalyst with mechanical moving parts in while control solid injection in riser, but do not measure the solid flow like the rotary valve. To control the lab made device a fixed pressure measurement at riser bottom is provided by control setup which corresponds to a given mass/time solid injection. In the present work, we proposed a method to evaluate the control valve based on a non-invasive technique. With gamma ray transmission measurements, in a cross section of the pipe, we developed a model that was used in the control system of the Cold Pilot Unit (CPU). Therefore, the interaction of the gamma ray with solid flow in riser should yield the necessary information for the process control system. A first model approximation consider the solid flow rate injection and solid velocity in riser as proposed in literature. In the CPU control system a Programmable Logic Controller-PLC keeps steady state processing the airflow, pressure profile and solid flow inputs. Additionally to preexisting PLC platform, some LabVIEW algorithms were implemented to achieve a good system performance operational condition. (author)

  2. Multidimensionality evaluation of supply chain management integration

    Directory of Open Access Journals (Sweden)

    Fernanda Paes Arantes

    2018-03-01

    Full Text Available Integration is constantly reported in the literature as an essential feature of SCM. However, it is as difficult to define as to operationalize it, resulting in a lack of information on how to increase the level of integration among members. Thus, this research aims to evaluate the dimensionality of SCI, to check alignment with the features identified in the literature using multivariate statistical analysis. The methodology used was based on a questionnaire to assess the level of companies integration with suppliers of its supply chain. This instrument consisted of 21 items, with response options: yes, no or not applicable. The questions focused on evaluating the integration with suppliers, so each company consulted could answer a questionnaire for each supplier, since the intensity of relationships varies. Thus, 41 companies participated in the survey, resulting in 205 responses. Full-information item factor analysis and principal component analysis on the correlation matrix tetrachoric were used for the instrument dimensionality analysis. They are appropriate procedures for analysis of dichotomous variables. The results of this analysis enabled grouping the questionnaire items in the following underlying factors: trust, information sharing, partnership, collaboration or cooperation, and coordination. The identification of such factors such as dimensions of SCI enables greater understanding on how to raise the level of integration among the members of a supply chain.

  3. Assessment and management of ecological integrity: Chapter 12

    Science.gov (United States)

    Kwak, Thomas J.; Freeman, Mary C.

    2010-01-01

    Assessing and understanding the impacts of human activities on aquatic ecosystems has long been a focus of ecologists, water resources managers, and fisheries scientists. While traditional fisheries management focused on single-species approaches to enhance fish stocks, there is a growing emphasis on management approaches at community and ecosystem levels. Of course, as fisheries managers shift their attention from narrow (e.g., populations) to broad organizational scales (e.g., communities or ecosystems), ecological processes and management objectives become more complex. At the community level, fisheries managers may strive for a fish assemblage that is complex, persistent, and resilient to disturbance. Aquatic ecosystem level objectives may focus on management for habitat quality and ecological processes, such as nutrient dynamics, productivity, or trophic interactions, but a long-term goal of ecosystem management may be to maintain ecological integrity. However, human users and social, economic, and political demands of fisheries management often result in a reduction of ecological integrity in managed systems, and this conflict presents a principal challenge for the modern fisheries manager. The concepts of biotic integrity and ecological integrity are being applied in fisheries science, natural resource management, and environmental legislation, but explicit definitions of these terms are elusive. Biotic integrity of an ecosystem may be defined as the capability of supporting and maintaining an integrated, adaptive community of organisms having a species composition, diversity, and functional organization comparable to that of a natural habitat of the region (Karr and Dudley 1981). Following that, ecological integrity is the summation of chemical, physical, and biological integrity. Thus, the concept of ecological integrity extends beyond fish and represents a holistic approach for ecosystem management that is especially applicable to aquatic systems. The

  4. Integration and change management for successful mergers; Integration und Change Management bei Fusionen

    Energy Technology Data Exchange (ETDEWEB)

    Wolf, H.G. [Arthur Andersen Business Consulting GmbH, Duesseldorf (Germany)

    2000-05-01

    In the wake of deregulation of the energy markets in Germany, energy companies and electric utilities are confronted with fierce competition on prices and customers. The change of paradigms in the German energy industry calls for new strategies. The article discusses strategic alliances and mergers as one way to cope with the challenges, and explains suitable and proven approaches for corporate integration and change management. (CB) [German] Seit der wettbewerblichen Oeffnung des deutschen Energiemarktes sehen sich die Unternehmen mit einem dramatischen Preis- und Marketingwettbewerb konfrontiert. Aggressive neue Akteure draengen in die lukrativen Maerkte. Aber auch etablierte Teilnehmer suchen neue strategische Positionen und beschleunigen den Paradigmenwechsel in der deutschen Energiewirtschaft. Angesichts dieser Marktentwicklung bestehen massive Anforderungen zur Veraenderung. Unternehmenszusammenschluesse und Kooperationen stellen eine geeignete strategische Reaktion zur Bewaeltigung dieser Herausforderungen dar. Dabei sollten die Risiken von Fusionen nicht unterschaetzt werden. Die meisten Vorhaben scheitern auf Grund fehlender Integrationsprozesse. Ein systematischer Integrationsansatz wird beschrieben. (orig./CB)

  5. Innovation Management in Emerging Technology Ventures – The Concept of an Integrated Idea Management

    DEFF Research Database (Denmark)

    Brem, Alexander; Voigt, K.-I.

    2007-01-01

    , development and sales. Here especially, differentiating potentials are offered for emerging technology ventures. But it is important that idea and innovation management are integrated during the building-up stage while internal and external network structures are still manageable and often consist...... of the managers' and founders' personal contacts. Hence, the earlier an integrated idea management is implemented, the greater is the probability of high numbers of successful innovations.......For decades, suggestion systems have been used to include employees in the innovation process. However, in order to gather superior ideas, integrating external stakeholders is critical to the innovation success. Within this paper, the authors derive a sophisticated model of an integrated idea...

  6. Research on monitoring and management information integration technique in waste treatment and management

    International Nuclear Information System (INIS)

    Kong Jinsong; Yu Ren; Mao Wei

    2013-01-01

    The integration of the waste treatment process and the device status monitoring information and management information is a key problem required to be solved in the information integration of the waste treatment and management. The main content of the monitoring and management information integration is discussed in the paper. The data exchange techniques, which are based on the OPC, FTP and data push technology, are applied to the different monitoring system respectively, according to their development platform, to realize the integration of the waste treatment process and device status monitoring information and management information in a waste treatment center. (authors)

  7. Recreating Riser Slugging Flow Based on an Economic Lab-sized Setup

    DEFF Research Database (Denmark)

    Hansen, Lasse; Pedersen, Simon; Yang, Zhenyu

    2013-01-01

    As a kind of periodic phenomenon, the slugging flow in the offshore oil & gas production addresses a lot of attentions, due to its limitation of production rate, periodic overload processing facilities, and even direct cause of emergent shutdown. This work studies the emulation of the riser...... slugging flow in the offshore oil & gas production, by constructing an economical lab-sized setup in the university campus. Firstly, the construction and used components for the lab setup are illustrated; then, the constructed setup is validated by checking the consistency with some existing typical riser...

  8. promoting integrated water resources management in south west

    African Journals Online (AJOL)

    eobe

    1, 2 SOUTH WEST REGIONAL CENTRE FOR NATIONAL WATER RESOURCES CAPACITY BUILDING NETWORK,. FEDERAL UNIVERSITY OF ... that an integrated approach to water resource development and management offers the best ...

  9. Evaluation of pre-service training on integrated management of ...

    African Journals Online (AJOL)

    Evaluation of pre-service training on integrated management of neonatal and childhood ... and reviews of pediatric course outlines and other teaching/learning materials. ... Of the 34 programs 22 were diploma nursing, 6 Bachelor of Sciences ...

  10. Integrated Measurement of Crew Resource Management and Technical Flying Skills

    Science.gov (United States)

    1993-08-01

    This report presents the findings of a study designed with two objectives: to produce a prototype performance : measurement instrument (PMI) that integrates the assessment of Crew Resource Management (CRM) and technical flying : skills and to investi...

  11. Integrated management of root-knot nematode (Meloidogyne ...

    African Journals Online (AJOL)

    Integrated management of root-knot nematode (Meloidogyne incognita) for tomato production and productivity. Bayuh Belay1* ... important food and cash crop of the farmers and is ...... some part of the research budget without any reservation.

  12. Adoption of Integrated Pest Management among Cocoa Farmers in ...

    African Journals Online (AJOL)

    E M IGBOKWE

    Keywords: Integrated pest management, Cocoa farmers, Farmers Field School ... Total World production has increased in absolute terms from 3.98 million metric ..... and G.C. Rausser, eds Handbook of Agricultural Economics, Vol. 1B,.

  13. Integrating distributed Bayesian inference and reinforcement learning for sensor management

    NARCIS (Netherlands)

    Grappiolo, C.; Whiteson, S.; Pavlin, G.; Bakker, B.

    2009-01-01

    This paper introduces a sensor management approach that integrates distributed Bayesian inference (DBI) and reinforcement learning (RL). DBI is implemented using distributed perception networks (DPNs), a multiagent approach to performing efficient inference, while RL is used to automatically

  14. Some aspects of integrated coastal zone management in India

    Digital Repository Service at National Institute of Oceanography (India)

    Untawale, A.G.

    . This trend has created tremendous pressures and the ecological balance is disturbing. There are various factors which are degrading the coastal waters. The Integrated Coastal Management is relatively a recent concept, which involves multidisciplinary approach...

  15. Sensor Area Network for Integrated Systems Health Management, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The term Integrated Systems Health Management (ISHM) is used to describe a capability that focuses on determining the condition of every element in a complex System...

  16. Integration of structural health monitoring and asset management.

    Science.gov (United States)

    2012-08-01

    This project investigated the feasibility and potential benefits of the integration of infrastructure monitoring systems into enterprise-scale transportation management systems. An infrastructure monitoring system designed for bridges was implemented...

  17. Chip Integrated, Hybrid EHD/Capillary Driven Thermal Management System

    Data.gov (United States)

    National Aeronautics and Space Administration — Chip-Integrated, Hybrid EHD/Capillary-Driven Thermal Management System is a two year that will leverage independently attained yet related prototype hardware...

  18. In-flight Integrated Mission Management System (I-LIMMS)

    National Research Council Canada - National Science Library

    Emmitt, George D; Greco, Steven; Wood, Sidney

    2006-01-01

    The goal of this Phase I SBIR effort was to determine the feasibility and preliminary design of I-LIMMS, an In-flight Lidar Integrated Mission Management System for the processing and visualization...

  19. Sensor Area Network for Integrated Systems Health Management, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The term Integrated Systems Health Management (ISHM) is used to describe a capability that focuses on determining the condition (health) of every element in a...

  20. Privacy Impact Assessment for the Integrated Grants Management System

    Science.gov (United States)

    The Integrated Management System collects contact information and other Personally Identifiable Information (PII). Learn how this data is collected, how it will be used, access to the data, the purpose of data collection, and record retention policies.

  1. Privacy Impact Assessment for the Integrated Contracts Management System

    Science.gov (United States)

    The Integrated Contracts Management System collects contact information and other Personally Identifiable Information (PII). Learn how this data will be collected in the system, how it will be used, access to the data, and the purpose of data collection.

  2. Integrated corridor management : implementation guide and lessons learned.

    Science.gov (United States)

    2012-02-01

    This implementation guide is intended for use by adopters of integrated corridor management (ICM) approaches and strategies to address congestion and travel time reliability issues within specific travel corridors. It introduces the topic of ICM and ...

  3. Development and improvement of the integrated system of management

    Directory of Open Access Journals (Sweden)

    Lukmanova Inessa Galeevna

    2014-07-01

    Full Text Available Integrated management system construction can be considered a way that transforms using business processes and information resources into final construction products. Autonomous system of quality management, environmental, health and safety organizations introduction usually lead to the accumulation of duplicate documents, which increase the time spent on processing and analysis as well as increase the financial costs of maintaining the operation of each of them separately. System integration allows reducing these costs and entailing the most obvious benefits: reduced volumes of documents; reduction of time spent on analysis; reducing the cost of audit and certification; involvement of all the employees of the organization; productivity growth; increasing the attractiveness for consumers; reducing the burden on administrative and executive devices; ensuring a high level of flexibility in the organization's management system in case of internal and external changes. Integration of quality management systems, environmental management and safety management systems, production and safety led to the possibility to establish such integrated management system in developing building companies, which allows establishing a unified management system, as an element of management of organization. The main drawback of the currently used standards and specifications is the lack of flexibility of their application, as well as the basic principles and approaches to their implementation. Thus, knowing about what the system should be, but not knowing how to create it, many organizations have to operate without methodological support. Absence of mandatory standards concerning integration of management systems creates opportunities for the existence of multiple options for interaction systems. Economic effects on the integrated management system is formed from three sources: the reduction of production costs by improving product quality and reducing defects and

  4. Integrated Structural Health Management, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Cornerstone Research Group Inc. (CRG) proposes to advance the state of the art in composite health management through refinement of an existing technology developed...

  5. Integrated sign management system : ADOT maintenance group

    Science.gov (United States)

    2003-12-01

    The Arizona Department of Transportation (ADOT) maintains and manages an inventory of roadway signs. Before the implementation of this project, sign technicians maintained inventory records on individual laptops to track their daily sign maintenance ...

  6. The integration of environmental management standards in ...

    African Journals Online (AJOL)

    Research in Hospitality Management is co-published by NISC (Pty) Ltd and Routledge, .... over a total of 12 categories that can all fit the concept of ... Purchasing strategies and reducing consumption ..... In this case there are three options: 1.

  7. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  8. Integrated Vegetation Management Practices Memorandum of Understanding

    Science.gov (United States)

    Memorandum of Understanding between EPA and the Edison Electric Institute, U.S. Department of Agriculture (Forest Service), and U.S. Department of the Interior (Bureau of Land Management, Fish and Wildlife Service, and National Park Service for IVM.

  9. Smallholder integrated crop management (ICM) research planning ...

    African Journals Online (AJOL)

    Mo

    More women farmers were invited because they do most of the farming. Other participants came from ... smallholders to innovate their land and crop management strategies. This would be ..... Asian Farming Systems Association, 2 (2): 67.

  10. An integration architecture for knowledge management system and business process management system

    NARCIS (Netherlands)

    Jung, J.; Choi, I.; Song, M.S.

    2007-01-01

    Recently, interests in the notion of process-oriented knowledge management (PKM) from academia and industry have been significantly increased. Comprehensive research and development requirements along with a cogent framework, however, have not been proposed for integrating knowledge management (KM)

  11. Management systems for high reliability organizations. Integration and effectiveness; Managementsysteme fuer Hochzuverlaessigkeitsorganisationen. Integration und Wirksamkeit

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, Michael

    2015-03-09

    The scope of the thesis is the development of a method for improvement of efficient integrated management systems for high reliability organizations (HRO). A comprehensive analysis of severe accident prevention is performed. Severe accident management, mitigation measures and business continuity management are not included. High reliability organizations are complex and potentially dynamic organization forms that can be inherently dangerous like nuclear power plants, offshore platforms, chemical facilities, large ships or large aircrafts. A recursive generic management system model (RGM) was development based on the following factors: systemic and cybernetic Asepcts; integration of different management fields, high decision quality, integration of efficient methods of safety and risk analysis, integration of human reliability aspects, effectiveness evaluation and improvement.

  12. Structural Integrity Management for Fixed Offshore Platforms in Malaysia

    OpenAIRE

    Narayanan Sambu Potty; Mohammad Kabir B. Mohd Akram

    2009-01-01

    Structural Integrity Management (SIM) is important for the protection of offshore crew, environment, business assets and company and industry reputation. API RP 2A contained guidelines for assessment of existing platforms mostly for the Gulf of Mexico (GOM). ISO 19902 SIM framework also does not specifically cater for Malaysia. There are about 200 platforms in Malaysia with 90 exceeding their design life. The Petronas Carigali Sdn Bhd (PCSB) uses the Asset Integrity Management ...

  13. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  14. Integrated management systems: survey results from Portuguese companies and experts

    OpenAIRE

    Domingues, Pedro; Sampaio, Paulo; Arezes, P.

    2012-01-01

    The proliferation of several certifiable sub-systems among different type of organizations lead companies to excessive departmentalization. This fact turned out to be, due to several reasons pointed out by numerous authors, disadvantageous. Hence, organizations optioned by integration of their management sub-systems. Academic awareness to this sociological event is mainly related with the fact of integration of management systems (IMS) had been performed empirically, that is, by each organiza...

  15. The tortoise shell Integrated Coastal Management in Galapagos

    OpenAIRE

    Polit Arguello, Victor Manuel

    2013-01-01

    The current work aims to examine the legal framework for Integrated Coastal Management for Archipelago de Galapagos. It examines the content of ICM at the internal level in order to find if there is a standard for appropriate Integrated Management of Coastal Zones. Also it aims to define whether the ratification of UNCLOS by the government of Ecuador should affect the implementation of such framework.

  16. Understanding Organizational Memory from the Integrated Management Systems (ERP)

    OpenAIRE

    Gilberto Perez; Isabel Ramos

    2013-01-01

    With this research, in the form of a theoretical essay addressing the theme of Organizational Memory and Integrated Management Systems (ERP), we tried to present some evidence of how this type of system can contribute to the consolidation of certain features of Organizational Memory. From a theoretical review of the concepts of Human Memory, extending to the Organizational Memory and Information Systems, with emphasis on Integrated Management Systems (ERP) we tried to draw a parallel between ...

  17. DESIGN OF INFORMATION MANAGEMENT SYSTEM OF VERTICALLY INTEGRATED AGRICULTURAL HOLDINGS

    Directory of Open Access Journals (Sweden)

    Александр Витальевич ШМАТКО

    2015-05-01

    Full Text Available The paper deals with an approach to the design and development of information systems for the management and optimization of the organizational structure of vertically integrated agricultural holdings. A review of the problems of building and improving the organizational structure of vertically integrated agricultural holding is made. A method of constructing a discrete model management structure agricultural holding, which minimizes the costs associated with attracting applicants to work, is proposed.

  18. Integrated management system: The integration of ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000

    Science.gov (United States)

    Muzaimi, Hafizzudin; Chew, Boon Cheong; Hamid, Syaiful Rizal

    2017-03-01

    The implementation of integrated management system (IMS) for better quality management has become a preference for many organizations. This can be seen as many organizations used the combination of quality ISO 9001, an environment ISO 14001 and occupational health and safety management system OHSAS 18001 as a core for the IMS that largely implemented. Besides, the linked between quality management with risk management system need to be identified as the management system that enhance the effectiveness of IMS. Therefore, the risk management system ISO 31000 also presented as a part of integration. In nowadays competitive environment, the increasing pressure and needs from customer or stakeholders make it compulsory for the organization to propose the new system and standards. This paper presents and discusses about the benefit of integration, the management system components that can be converged and the implementation approach. A series of interview was conducted through in-depth interviews with 8 experts in this field, while data collected were analyzed qualitatively. The results consist of 16 factors of IMS implementation that have been identified and the use of PDCA approach for an effective implementation of IMS. As a conclusion, the paper proposes the integration of four management systems (ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000) and on how the IMS can be used to structure the process of management for quality management towards sustainability practices in the organization.

  19. Maintaining control while delegating trust: Integrity constraints in trust management

    NARCIS (Netherlands)

    Etalle, S.; Winsborough, W.H.

    2009-01-01

    We introduce the use, monitoring, and enforcement of integrity constraints in trust management-style authorization systems. We consider what portions of the policy state must be monitored to detect violations of integrity constraints. Then, we address the fact that not all participants in a

  20. Integrated Pest Management of the Southern Pine Beetle

    Science.gov (United States)

    Robert N. Coulson; Hannu Saarenmaa

    2011-01-01

    Integrated pest management (IPM) is the maintenance of destructive agents, including insects, at tolerable levels by the planned use of a variety of preventive, suppressive, or regulatory tactics and strategies that are ecologically and economically efficient and socially and politically acceptable. It is explicit that the actions taken are fully integrated into the...

  1. Implementing Integrated Multicultural Instructional Design in Management Education

    Science.gov (United States)

    Schultz, Jennifer L.; Higbee, Jeanne L.

    2011-01-01

    This purpose of this paper is to summarize the principles of integrated multicultural instructional design (IMID; Higbee, Goff, & Schultz, in press; Higbee, Schultz, & Goff, 2010) and present specific strategies for incorporating IMID in management education. The primary goal of IMID is to promote the integration of multicultural content…

  2. Integrating Social Science and Ecosystem Management: A National Challenge

    Science.gov (United States)

    Cordell; H. Ken; Linda Caldwell

    1995-01-01

    These proceedings contain the contributed papers and panel presentations, as well as a paper presented at the National Workshop, of the Conference on Integrating Social Sciences and Ecosystem Management, which was held at Unicoi Lodge and Conference Center, Helen, GA, December 12-14, 1995. The overall purpose of this Conference was to improve understanding, integration...

  3. Integrating an Information Literacy Quiz into the Learning Management System

    Science.gov (United States)

    Lowe, M. Sara; Booth, Char; Tagge, Natalie; Stone, Sean

    2014-01-01

    The Claremont Colleges Library Instruction Services Department developed a quiz that could be integrated into the consortial learning management software to accompany a local online, open-source information literacy tutorial. The quiz is integrated into individual course pages, allowing students to receive a grade for completion and improving…

  4. Management Ethics: Integrity at Work. Sage Series on Business Ethics.

    Science.gov (United States)

    Petrick, Joseph A.; Quinn, John F.

    This book tries to redefine what it means for a manager to function with integrity and competence in the private and public sectors domestically and globally. It integrates theoretical work in both descriptive and normative ethics and incorporates legal, communication, quality, and organizational theories into a conceptual framework designed to…

  5. Thermal Management in Fine-Grained 3-D Integrated Circuits

    OpenAIRE

    Iqbal, Md Arif; Macha, Naveen Kumar; Danesh, Wafi; Hossain, Sehtab; Rahman, Mostafizur

    2018-01-01

    For beyond 2-D CMOS logic, various 3-D integration approaches specially transistor based 3-D integrations such as monolithic 3-D [1], Skybridge [2], SN3D [3] holds most promise. However, such 3D architectures within small form factor increase hotspots and demand careful consideration of thermal management at all levels of integration [4] as stacked transistors are detached from the substrate (i.e., heat sink). Traditional system level approaches such as liquid cooling [5], heat spreader [6], ...

  6. Integrated model for line balancing with workstation inventory management

    OpenAIRE

    Dilip Roy; Debdip khan

    2010-01-01

    In this paper, we address the optimization of an integrated line balancing process with workstation inventory management. While doing so, we have studied the interconnection between line balancing and its conversion process. Almost each and every moderate to large manufacturing industry depends on a long and integrated supply chain, consisting of inbound logistic, conversion process and outbound logistic. In this sense an approach addresses a very general problem of integrated line balancing....

  7. Integrated Management of Residential Energy Resources

    Directory of Open Access Journals (Sweden)

    Antunes C. H.

    2012-10-01

    Full Text Available The increasing deployment of distributed generation systems based on renewables in the residential sector, the development of information and communication technologies and the expected evolution of traditional power systems towards smart grids are inducing changes in the passive role of end-users, namely with stimuli to change residential demand patterns. The residential user should be able to make decisions and efficiently manage his energy resources by taking advantages from his flexibility in load usage with the aim to minimize the electricity bill without depreciating the quality of energy services provided. The aim of this paper is characterizing electricity consumption in the residential sector and categorizing the different loads according to their typical usage, working cycles, technical constraints and possible degree of control. This categorization of end-use loads contributes to ascertain the availability of controllable loads to be managed as well as the different direct management actions that can be implemented. The ability to implement different management actions over diverse end-use load will increase the responsiveness of demand and potentially raises the willingness of end-users to accept such activities. The impacts on the aggregated national demand of large-scale dissemination of management systems that would help the end-user to make decisions regarding electricity consumption are predicted using a simulator that generates the aggregated residential sector electricity consumption under variable prices.

  8. Integrating technologies for effective knowledge management

    Energy Technology Data Exchange (ETDEWEB)

    Beaugrand, F.S.; Curtis, T.A. [Public Petroleum Data Model, PPDM Association, Calgary, AB (Canada)

    2002-06-01

    In order to succeed in today's business environment, effective knowledge management strategies are needed along with effective tools to solve real business problems. Relational databases provide accessible and practical tools that can be used to manage corporate knowledge assets. However, technology is growing so rapidly that it is difficult and too expensive for individual corporations to pursue each line of development independently. Collaborative efforts are needed to improve access to shared knowledge. The PPDM Association is an international not for profit standards body that is working collaboratively with the petroleum exploration and production industry to develop standards for managing data and knowledge, spatially enabling data, standardizing data content and data exchange. The PPDM Association provides a vendor-neutral environment for development, technical support and a methodology for designing, developing and publishing technical deliverables.

  9. Nuclear safety culture and integrated risk management

    International Nuclear Information System (INIS)

    Joksimovich, V.; Orvis, D.D.

    1993-01-01

    A primary focus of nuclear safety is the prevention of large releases of radioactivity in the case of low-probability severe accidents. An analysis of the anatomy of nuclear (Chernobyl, Three Mile Island Unit 2) and nonnuclear (Challenger, Bhopal, Piper Alpha, etc.) severe accidents yields four broad categories of root causes: human (operating crew response), machine (design with its basic flaws), media (natural phenomena, operational considerations, political environment, commercial pressures, etc.)-providing triggering events, and management (basic organizational safety culture flaws). A strong management can minimize the contributions of humans, machines, and media to the risk arising from the operation of hazardous facilities. One way that management can have a powerful positive influence is through the establishment of a proper safety culture. The term safety culture is used as defined by the International Atomic Energy Agency's International Safety Advisory Group

  10. Managed care, vertical integration strategies and hospital performance.

    Science.gov (United States)

    Wang, B B; Wan, T T; Clement, J; Begun, J

    2001-09-01

    The purpose of this study is to examine the association of managed care with hospital vertical integration strategies, as well as to observe the relationships of different types of vertical integration with hospital efficiency and financial performance. The sample consists of 363 California short-term acute care hospitals in 1994. Linear structure equation modeling is used to test six hypotheses derived from the strategic adaptation model. Several organizational and market factors are controlled statistically. Results suggest that managed care is a driving force for hospital vertical integration. In terms of performance, hospitals that are integrated with physician groups and provide outpatient services (backward integration) have better operating margins, returns on assets, and net cash flows (p < 0.01). These hospitals are not, however, likely to show greater productivity. Forward integration with a long-term-care facility, on the other hand, is positively and significantly related to hospital productivity (p < 0.001). Forward integration is negatively related to financial performance (p < 0.05), however, opposite to the direction hypothesized. Health executives should be responsive to the growth of managed care in their local market and should probably consider providing more backward integrated services rather than forward integrated services in order to improve the hospital's financial performance in today's competitive health care market.

  11. THE PLACE OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM IN THE INTEGRATED MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Piotr Kafel

    2016-06-01

    Full Text Available The purpose of this paper is to analyze the place of occupational health and safety management system (OHSMS within the integrated management system. Implementation aspects of management systems are discussed, namely the different management system standards used for registration, for example ISO 14001, ISO 9001, OHSAS 18001, ISO 27001, the order in which they were implemented, the time required for each implementation, as well as the scope of integration of these management system standards into a single Integrated Management System and the level of integration. In order to do so, some of the results of a survey carried out in 81 organizations registered to at least two management systems selected from popular international standards, e.g.: ISO 9001, ISO 14001, OHSAS 18001, ISO/IEC 27001, ISO 22000 were used. OHSMS is not the system that is implemented as a first one. Usually it is implemented after or simultaneously with ISO 9001 and ISO 14001 standards. Time of implementation of MSSs in second and further round of implementation is shorter than during the implementation of first standards. There is a higher level of integration of implemented management standards in organizations where one of the standards in OHSMS, than in a companies without OHSMS. The paper analyses those sequences of management systems implementation of safety management systems with other system, that allow organizations to achieve higher levels of integration and presents a possible pattern for the companies initiating the integration process.

  12. Barriers to Asthma Management for School Nurses: An Integrative Review

    Science.gov (United States)

    Hanley Nadeau, Ellen; Toronto, Coleen E.

    2016-01-01

    Childhood asthma is a growing health concern. Asthma is the most common chronic illness of childhood and a leading cause of emergency room visits, hospitalizations, and school absenteeism. School nurses play a valuable role in asthma management. The purpose of this integrative review is to examine barriers to asthma management for school nurses in…

  13. Integral system of management quality - company quality assurance

    International Nuclear Information System (INIS)

    Dimitrovski, Aleksandar

    1999-01-01

    Integral System of Management Quality is imposed as a solution which in the future will be applied in the companies more frequently, provoked from the needs for solving management quality, working conditions, ecology, safety at work, way of leaving, etc. (Original)

  14. From Knowledge Theory to Management Practice: Towards an Integrated Approach.

    Science.gov (United States)

    Shin, Minsoo; Holden, Tony; Schmidt, Ruth A.

    2001-01-01

    Critically contrasts the three main schools of thought on knowledge and assesses the resulting implications for knowledge management. Presents a conceptual model to integrate theoretical and practical themes to serve as a framework for developing a future research agenda for the development of knowledge management business tools and applications.…

  15. Challenges of Integrated Pest Management in Sub-Saharan Africa

    NARCIS (Netherlands)

    Huis, van A.

    2009-01-01

    a response to the negative side effects of chemical control in the developed world, Integrated Pest Management (IPM) developed with an emphasis on reducing the role of pesticides. Later the role of natural enemies was recognized as being the cornerstone for sustainable pest management strategies.

  16. Integrating the traditional and the modern conflict management ...

    African Journals Online (AJOL)

    The study examines the modalities for integrating traditional and modern conflict management strategies in Nigeria using an analysis of relevant documents as well as Black's Social Control Theory and Thomas-Kilmann's Model of Conflict Management. The successful amalgamation of diverse groups has radically shifted ...

  17. Integration of Women into Management Positions: A Research Review.

    Science.gov (United States)

    Terborg, James R.

    This paper reviews the literature on the psychological and social processes involved in the integration of women into management positions. The author concentrates on two areas. First is the entry of women into management (including women's career choices, choice of organization, and the effects of these choices on the organization. These effects…

  18. Multidisciplinary management--an opportunity for service integration.

    Science.gov (United States)

    Cameron, M

    1997-01-01

    The management team of the future will enter an environment requiring facilitation, participation, clinical, and empowerment skills. Those individuals who possess a clinical orientation as well as business expertise will be sought to manage multidisciplinary units. The rapid changes in the health-care environment have forced organizations to restructure their operations. To achieve quality care, customer satisfaction, cost-effectiveness, and efficiency, service integration across the organization will be required. As we approach the 21st century, this standard will evolve until "all levels are managing patient care." Some of the restructuring trends occurring in the health-care industry have been collaboration service integration, management consolidation, and job elimination. The emphasis for the multidisciplinary manager of the future will include integrating the professional and clinical services, managing information, building community partnerships, promoting physician collaboration, and managing the change process. A model organization in the next century will move toward a people-oriented system with inclusion and empowerment initiatives. Service integration will affect all organizations, but the disciplines within the Clinical Support System will be the most affected. Future opportunities of leadership will exist for pathologists, nurses, or medical technologists as the professional silos of managers and clinicians continue to crumble.

  19. Supply Chain Management and Sustainability : Procrastinating Integration in Mainstream Research

    NARCIS (Netherlands)

    De Brito, M.P.; Van der Laan, E.A.

    2010-01-01

    Research has pointed out opportunities and research agendas to integrate sustainability issues with supply chain and operations management. However, we find that it is still not mainstream practice to systematically take a sustainability approach in tackling supply chain and operations management

  20. Development and Implementation of Integrated Pest Management in ...

    African Journals Online (AJOL)

    Nafiisah

    This paper reviews the status of Integrated Pest Management (IPM) research in. Mauritius and also reports on the successful cases of IPM implementation during ... Tool. Activity. Status. Source. Biological control. Introduce parasitoids .... 10 g sugar in 1 L of water) in plastic bottles as one option to manage fruit flies in.

  1. The integration of quality management functions within a university ...

    African Journals Online (AJOL)

    According to a recent study, institutions of higher learning in South Africa fail to a great extent to integrate the key management functions that are fundamental to effective quality management. This article argues that the effective promotion of quality of a university's core business depends to a large extent on the ability of an ...

  2. A review of Integrated Management of Childhood Illness (IMCI ...

    African Journals Online (AJOL)

    The Integrated Management of Childhood Illness (IMCI) strategy is the primary child-care approach of choice for South Africa.1,2 IMCI training was introduced into ... by nurse practitioner and doctor alike in empowering them to make easy, evidence-based decisions in the management of sick children at first contact level.

  3. The Integrative University: Why University Management Is Different

    Science.gov (United States)

    Temple, Paul

    2008-01-01

    Managing universities "is" different from managing in most other sorts of organisation. In this article, the author shows why this claim is more than just special pleading, and how it relates to the particular form of the organisation. Appreciating their integrative aspects helps people to understand some of the difficulties that they regularly…

  4. Integrating Cybersecurity into the Program Management Organization

    Science.gov (United States)

    2015-05-13

    penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 13 MAY 2015 2...Threat to our National Economy DOD Cybersecurity Gaps Could Be Canary in Federal Acquisition Coal Mine Intangible Assets Create Vulnerabilities...operational approach integrates with current or planned CONOPS, BCP, information architecture, programs or initiatives Development  Approach to

  5. Integrating Total Quality Management (TQM) and hazardous waste management

    Energy Technology Data Exchange (ETDEWEB)

    Kirk, Nancy [Colorado State Univ., Fort Collins, CO (United States)

    1993-11-01

    The Resource Conservation and Recovery Act (RCRA) of 1976 and its subsequent amendments have had a dramatic impact on hazardous waste management for business and industry. The complexity of this law and the penalties for noncompliance have made it one of the most challenging regulatory programs undertaken by the Environmental Protection Agency (EPA). The fundamentals of RCRA include ``cradle to grave`` management of hazardous waste, covering generators, transporters, and treatment, storage, and disposal facilities. The regulations also address extensive definitions and listing/identification mechanisms for hazardous waste along with a tracking system. Treatment is favored over disposal and emphasis is on ``front-end`` treatment such as waste minimization and pollution prevention. A study of large corporations such as Xerox, 3M, and Dow Chemical, as well as the public sector, has shown that well known and successful hazardous waste management programs emphasize pollution prevention and employment of techniques such as proactive environmental management, environmentally conscious manufacturing, and source reduction. Nearly all successful hazardous waste programs include some aspects of Total Quality Management, which begins with a strong commitment from top management. Hazardous waste management at the Rocky Flats Plant is further complicated by the dominance of ``mixed waste`` at the facility. The mixed waste stems from the original mission of the facility, which was production of nuclear weapons components for the Department of Energy (DOE). A Quality Assurance Program based on the criterion in DOE Order 5700.6C has been implemented at Rocky Flats. All of the elements of the Quality Assurance Program play a role in hazardous waste management. Perhaps one of the biggest waste management problems facing the Rocky Flats Plant is cleaning up contamination from a forty year mission which focused on production of nuclear weapon components.

  6. Integrating Total Quality Management (TQM) and hazardous waste management

    International Nuclear Information System (INIS)

    Kirk, N.

    1993-01-01

    The Resource Conservation and Recovery Act (RCRA) of 1976 and its subsequent amendments have had a dramatic impact on hazardous waste management for business and industry. The complexity of this law and the penalties for noncompliance have made it one of the most challenging regulatory programs undertaken by the Environmental Protection Agency (EPA). The fundamentals of RCRA include ''cradle to grave'' management of hazardous waste, covering generators, transporters, and treatment, storage, and disposal facilities. The regulations also address extensive definitions and listing/identification mechanisms for hazardous waste along with a tracking system. Treatment is favored over disposal and emphasis is on ''front-end'' treatment such as waste minimization and pollution prevention. A study of large corporations such as Xerox, 3M, and Dow Chemical, as well as the public sector, has shown that well known and successful hazardous waste management programs emphasize pollution prevention and employment of techniques such as proactive environmental management, environmentally conscious manufacturing, and source reduction. Nearly all successful hazardous waste programs include some aspects of Total Quality Management, which begins with a strong commitment from top management. Hazardous waste management at the Rocky Flats Plant is further complicated by the dominance of ''mixed waste'' at the facility. The mixed waste stems from the original mission of the facility, which was production of nuclear weapons components for the Department of Energy (DOE). A Quality Assurance Program based on the criterion in DOE Order 5700.6C has been implemented at Rocky Flats. All of the elements of the Quality Assurance Program play a role in hazardous waste management. Perhaps one of the biggest waste management problems facing the Rocky Flats Plant is cleaning up contamination from a forty year mission which focused on production of nuclear weapon components

  7. Development of integrated accident management assessment technology

    International Nuclear Information System (INIS)

    Jung, Won Dea; Ha, Jae Joo; Jin, Young Ho

    2002-04-01

    This project aims to develop critical technologies for accident management through securing evaluation frameworks and supporting tools, in order to enhance capabilities coping with severe accidents. For the research goal, firstly under the viewpoint of accident prevention, on-line risk monitoring system and the analysis framework for human error have been developed. Secondly, the training/supporting systems including the training simulator and the off-site risk evaluation system have been developed to enhance capabilities coping with severe accidents. Four kinds of research results have been obtained from this project. Firstly, the framework and taxonomy for human error analysis has been developed for accident management. As the second, the supporting system for accident managements has been developed. Using data that are obtained through the evaluation of off-site risk for Younggwang site, the risk database as well as the methodology for optimizing emergency responses has been constructed. As the third, a training support system, SAMAT, has been developed, which can be used as a training simulator for severe accident management. Finally, on-line risk monitoring system, DynaRM, has been developed for Ulchin 3 and 4 unit

  8. Integrated management of thesis using clustering method

    Science.gov (United States)

    Astuti, Indah Fitri; Cahyadi, Dedy

    2017-02-01

    Thesis is one of major requirements for student in pursuing their bachelor degree. In fact, finishing the thesis involves a long process including consultation, writing manuscript, conducting the chosen method, seminar scheduling, searching for references, and appraisal process by the board of mentors and examiners. Unfortunately, most of students find it hard to match all the lecturers' free time to sit together in a seminar room in order to examine the thesis. Therefore, seminar scheduling process should be on the top of priority to be solved. Manual mechanism for this task no longer fulfills the need. People in campus including students, staffs, and lecturers demand a system in which all the stakeholders can interact each other and manage the thesis process without conflicting their timetable. A branch of computer science named Management Information System (MIS) could be a breakthrough in dealing with thesis management. This research conduct a method called clustering to distinguish certain categories using mathematics formulas. A system then be developed along with the method to create a well-managed tool in providing some main facilities such as seminar scheduling, consultation and review process, thesis approval, assessment process, and also a reliable database of thesis. The database plays an important role in present and future purposes.

  9. INTEGRATION OF PROGRESS STRATEGY IN PROJECT MANAGEMENT

    OpenAIRE

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-01-01

    The methods and tools of the developed project promotion, the planning system of promotion strategy are suggested; the main approaches used in the project promotion have been identified. The conclusions about the importance, necessity and role in the promotion of a holistic project management system have been made.

  10. Management of Uncertain Data - towards unattended integration

    NARCIS (Netherlands)

    de Keijzer, Ander

    2008-01-01

    In recent years, the need to support uncertain data has increased. Sensor applications, for example, are dealing with the inherent uncertainty about the readings of the sensors. Current database management systems are not equipped to deal with this uncertainty, other than as a user defined

  11. Steam generator asset management: integrating technology and asset management

    International Nuclear Information System (INIS)

    Shoemaker, P.; Cislo, D.

    2006-01-01

    Asset Management is an established but often misunderstood discipline that is gaining momentum within the nuclear generation industry. The global impetus behind the movement toward asset management is sustainability. The discipline of asset management is based upon three fundamental aspects; key performance indicators (KPI), activity-based cost accounting, and cost benefits/risk analysis. The technology associated with these three aspects is fairly well-developed, in all but the most critical area; cost benefits/risk analysis. There are software programs that calculate, trend, and display key-performance indicators to ensure high-level visibility. Activity-based costing is a little more difficult; requiring a consensus on the definition of what comprises an activity and then adjusting cost accounting systems to track. In the United States, the Nuclear Energy Institute's Standard Nuclear Process Model (SNPM) serves as the basis for activity-based costing. As a result, the software industry has quickly adapted to develop tracking systems that include the SNPM structure. Both the KPI's and the activity-based cost accounting feed the cost benefits/risk analysis to allow for continuous improvement and task optimization; the goal of asset management. In the case where the benefits and risks are clearly understood and defined, there has been much progress in applying technology for continuous improvement. Within the nuclear generation industry, more specialized and unique software systems have been developed for active components, such as pumps and motors. Active components lend themselves well to the application of asset management techniques because failure rates can be established, which serves as the basis to quantify risk in the cost-benefits/risk analysis. A key issue with respect to asset management technologies is only now being understood and addressed, that is how to manage passive components. Passive components, such as nuclear steam generators, reactor vessels

  12. Multiple sclerosis care: an integrated disease-management model.

    Science.gov (United States)

    Burks, J

    1998-04-01

    A disease-management model must be integrated, comprehensive, individual patient focused and outcome driven. In addition to high quality care, the successful model must reduce variations in care and costs. MS specialists need to be intimately involved in the long-term care of MS patients, while not neglecting primary care issues. A nurse care manager is the "glue" between the managed care company, health care providers and the patient/family. Disease management focuses on education and prevention, and can be cost effective as well as patient specific. To implement a successful program, managed care companies and health care providers must work together.

  13. "INTEGRATED QUALITY MANAGEMENT" AS A SUBJECT IN HIGHER EDUCATION CURRICULUM

    Directory of Open Access Journals (Sweden)

    Stevan Živojinović

    2007-03-01

    Full Text Available The importance of introduction of "Integrated quality management" into higher education curricula arises from the need for students to grasp synergetic application of new and advanced approaches to theoretical and practical management quality and process based management in particular as well as understanding a unified concept which improves conformity and linking of all levels in management hierarchy (normative, strategic and operational toward accomplishment of successful business performance. A curriculum is proposed (as a contribution to a map of necessary knowledge to be expected from prospective quality personnel with appropriate topics in accordance with studies objective and chosen up-to-date options of management concepts and methods.

  14. Managing the physics of the economics of integrated health care.

    Science.gov (United States)

    Zismer, Daniel K; Werner, Mark J

    2012-01-01

    The physics metaphor, as applied to the economics (and financial performance) of the integrated health system, seems appropriate when considered together with the nine principles of management framework provided. The nature of the integrated design enhances leaders' management potential as they consider organizational operations and strategy in the markets ahead. One question begged by this argument for the integrated design is the durability, efficiency and ultimate long-term survivability of the more "traditional" community health care delivery models, which, by design, are fragmented, internally competitive and less capital efficient. They also cannot exploit the leverage of teams, optimal access management or the pursuit of revenues made available in many forms. For those who wish to move from the traditional to the more integrated community health system designs (especially those who have not yet started the journey), the path requires: * Sufficient balance sheet capacity to fund the integration process-especially as the model requires physician practice acquisitions and electronic health record implementations * A well-prepared board13, 14 * A functional, durable and sustainable physician services enterprise design * A redesigned organizational and governance structure * Favorable internal financial incentives alignment design * Effective accountable physician leadership * Awareness that the system is not solely a funding strategy for acquired physicians, rather a fully -.. committed clinical and business model, one in which patient-centered integrated care is the core service (and not acute care hospital-based services) A willingness to create and exploit the implied and inherent potential of an integrated design and unified brand Last, it's important to remember that an integrated health system is a tool that creates a "new potential" (a physics metaphor reference, one last time). The design doesn't operate itself. Application of the management principles

  15. Clarifying the Imperative of Integration Research for Sustainable Environmental Management

    Directory of Open Access Journals (Sweden)

    Stephen Dovers

    2005-01-01

    Full Text Available This paper discusses why integration is important in doing research for developing policy and practice of sustainable environmental management. The imperative of integration includes environmental, social, economic, and other disciplinary considerations, as well as stakeholder interests. However, what is meant by integration is not always clear. While the imperative is being increasingly enunciated, the challenges it presents are difficult and indicate a long term pursuit. This paper clarifies the different dimensions of integration, as an important preliminary step toward advancing mutual understanding and the development of approaches. The paper identifies the driving forces for integration, discusses when integration is required, categorises forms of integration, and proposes principles to inform research programs and projects.

  16. Integrating total quality management in a library setting

    CERN Document Server

    Jurow, Susan

    2013-01-01

    Improve the delivery of library services by implementing total quality management (TQM), a system of continuous improvement employing participative management and centered on the needs of customers. Although TQM was originally designed for and successfully applied in business and manufacturing settings, this groundbreaking volume introduces strategies for translating TQM principles from the profit-based manufacturing sector to the library setting. Integrating Total Quality Management in a Library Setting shows librarians how to improve library services by implementing strategies such as employ

  17. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  18. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  19. Integrated flexible capacity and inventory management under flexible capacity uncertainty

    OpenAIRE

    Paç, Mehmet Fazıl

    2006-01-01

    Cataloged from PDF version of article. In a manufacturing environment with volatile demand, inventory management can be coupled with dynamic capacity adjustments for handling the fluctuations more effectively. In this study we consider the integrated management of inventory and flexible capacity management under seasonal stochastic demand and uncertain labor supply. The capacity planning problem is investigated from the workforce planning perspective. We consider a manufactu...

  20. INTEGRATION MECHANISMS OF IMPROVEMENT OF HUMAN RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vera A. Akimenko

    2013-01-01

    Full Text Available In the current economic conditions, the efficiency of business processes of an organization is determined by the quality of the staff. Therefore, actual is the creation and application of new approaches to the management of human re-sources. The article presents a comparative analysis of management practices and their impact on the effectiveness of personnel management, the mechanism of their integration to improve the efficiency of the process.

  1. Integrated management system implementation strategy for PUSPATI TRIGA Reactor

    International Nuclear Information System (INIS)

    Phongsakorn Prak Tom; Shaharum Ramli; Mohamad Azman Che Mat Isa; Shahirah Abdul Rahman; Mohd Zaid Mohamed; Mat Zin Mat Husin; Nurfazila Husain; Mohamad Puad Abu

    2012-01-01

    Integrated Management System (IMS) designed to fulfil the requirements integrates safety, health, environmental, security, quality and economic elements. PUSPATI TRIGA Reactor (RTP) is currently implementing the Quality Assurance Program (QAP) and looking toward implementation of IMS. This paper discussed the implementation strategy of IMS for RTP. There are nine steps of IMS implementation strategy. In implementation of IMS, Gantt chart is useful project management tool in managing the project frame work. IMS is intended as a tool to enable the continuous development of safety culture and achieve higher safety levels. (author)

  2. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  3. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  4. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  5. Integrated information and logistics management, quality management and firm performance of pork processing industry in China

    NARCIS (Netherlands)

    Han, J.; Trienekens, J.H.; Omta, S.W.F.

    2009-01-01

    Purpose – This paper seeks to discuss the interactions amongst integrated information technology (IT), integrated logistics management, quality management practices and firm performance of pork processors in China. Design/methodology/approach – A conceptual framework was developed by examining the

  6. Integrated remotely sensed datasets for disaster management

    OpenAIRE

    McCarthy, Tim; Farrell, Ronan; Curtis, Andrew; Fotheringham, A. Stewart

    2008-01-01

    Video imagery can be acquired from aerial, terrestrial and marine based platforms and has been exploited for a range of remote sensing applications over the past two decades. Examples include coastal surveys using aerial video, routecorridor infrastructures surveys using vehicle mounted video cameras, aerial surveys over forestry and agriculture, underwater habitat mapping and disaster management. Many of these video systems are based on interlaced, television standards such as North...

  7. Integral management of hazardous materials transport

    International Nuclear Information System (INIS)

    Moran, M.

    2002-01-01

    As a result of outsourcing transport operations and complementary services on the part of the producers and shippers, there is a growing demand for global services that integrate the whole external logistics value chain, the latter being understood to signify the process that includes the storage, transport (monomodal or bi-multi-modal) and delivery to destination. This circumstance has obliged transport firms to undertake a process of internal transformation: from offering an activity purely of transport to becoming logistics operators. Express Truck, S. a. (hereinafter ETSA) could not ignore this market requirement. We will explain the evolutionary process of ETSA in this sense. (Author)

  8. Three-Dimensional Dynamics of a Flexible Marine Riser Undergoing Large Elastic Deformations

    International Nuclear Information System (INIS)

    Raman-Nair, W.; Baddour, R.E.

    2003-01-01

    The equations of the three dimensional motion of a marine riser undergoing large elastic deformations are formulated using Kane's formalism. The riser is modeled using lumped masses connected by extensional and rotational springs including structural damping. Surface waves are described by Stokes? second-order wave theory. Fluid-structure coupling is achieved by application of the hydrodynamic loads via Morison's equation and added-mass coefficients using the instantaneous relative velocities and accelerations between the fluid field and the riser segments. In the same way, a model for incorporating the effects of vortex-induced lift forces is included. The effect of internal flow is included in the model. The detailed algorithm is presented and the equations are solved using a robust implementation of the Runge-Kutta method provided in MATLAB. The mathematical model and associated algorithm are validated by comparing the steady-state equilibrium configuration of the riser with special cases of an elastic catenary mooring line and large deflection statics of a cantilever beam. The results of sample simulations are presented

  9. Tools for Inspecting and Sampling Waste in Underground Radioactive Storage Tanks with Small Access Riser Openings

    International Nuclear Information System (INIS)

    Nance, T.A.

    1998-01-01

    Underground storage tanks with 2 inches to 3 inches diameter access ports at the Department of Energy's Savannah River Site have been used to store radioactive solvents and sludge. In order to close these tanks, the contents of the tanks need to first be quantified in terms of volume and chemical and radioactive characteristics. To provide information on the volume of waste contained within the tanks, a small remote inspection system was needed. This inspection system was designed to provide lighting and provide pan and tilt capabilities in an inexpensive package with zoom abilities and color video. This system also needed to be utilized inside of a plastic tent built over the access port to contain any contamination exiting from the port. This system had to be build to travel into the small port opening, through the riser pipe, into the tank evacuated space, and out of the riser pipe and access port with no possibility of being caught and blocking the access riser. Long thin plates were found in many access riser pipes that blocked the inspection system from penetrating into the tank interiors. Retrieval tools to clear the plates from the tanks using developed sampling devices while providing safe containment for the samples. This paper will discuss the inspection systems, tools for clearing access pipes, and solvent sampling tools developed to evaluate the tank contents of the underground solvent storage tanks

  10. Integrated Data Management for Mobile Services in the Real World

    DEFF Research Database (Denmark)

    Hage, C.; Jensen, Christian Søndergaard; Pedersen, Torben Bach

    2003-01-01

    Market research companies predict a huge market for services to be delivered to mobile users. Services in5 clude route guidance, point-of-interest search, metering services such as road pricing and parking payment, traffic monitoring, etc. We believe that no single such service will be the killer...... service, but that suites of integrated services are called for. Such integrated services reuse integrated content obtained from multiple content providers. This paper describes concepts and techniques underlying the data management system deployed by a Danish mobile content integrator. While geo...

  11. Improving integration for integrated coastal zone management: an eight country study.

    Science.gov (United States)

    Portman, M E; Esteves, L S; Le, X Q; Khan, A Z

    2012-11-15

    Integrated coastal zone management (ICZM) is a widely accepted approach for sustainable management of the coastal environment. ICZM emphasizes integration across sectors, levels of government, uses, stakeholders, and spatial and temporal scales. While improving integration is central to progress in ICZM, the role of and the achievement of integration remain understudied. To further study these two points, our research analyzes the performance of specific mechanisms used to support ICZM in eight countries (Belgium, India, Israel, Italy, Portugal, Sweden, UK, and Vietnam). The assessment is based on a qualitative comparative analysis conducted through the use of two surveys. It focuses on five ICZM mechanisms (environmental impact assessment; planning hierarchy; setback lines; marine spatial planning, and regulatory commission) and their role in improving integration. Our findings indicate that certain mechanisms enhance specific types of integration more effectively than others. Environmental impact assessment enhances science-policy integration and can be useful to integrate knowledge across sectors. Planning hierarchy and regulatory commissions are effective mechanisms to integrate policies across government levels, with the latter also promoting public-government integration. Setback lines can be applied to enhance integration across landscape units. Marine spatial planning is a multi-faceted mechanism with the potential to promote all types of integration. Policy-makers should adopt the mechanisms that are suited to the type of integration needed. Results of this study also contribute to evidence-based coastal management by identifying the most common impediments related to the mechanisms of integration in the eight studied countries. Copyright © 2012 Elsevier B.V. All rights reserved.

  12. Effects of top management involvement in integrated marketing communications

    Directory of Open Access Journals (Sweden)

    Nina Hočevar

    2007-12-01

    Full Text Available There is scarce empirical evidence in the academic literature of how top management involvement influences the degree of integrated marketing communications. At the same time, some authors believe that this relationship should be explored more extensively.In this paper we present one possible approach to investigating the relationship between top management involvement and the degree of integrated marketing communications. Our research established that a greater involvement of top management in marketing communications could be associated with a higher degree of IMC. Investigating the relationship between management and IMC is indeed at a very early stage. We suggest that this study has provided a basis for future research on the relationship between top management involvement in marketing communications and the degree of IMC.

  13. Integrating risk management into the baselining process

    International Nuclear Information System (INIS)

    Jennett, N.; Tonkinson, A.

    1994-01-01

    These processes work together in building the project (comprised of the technical, schedule, and cost baselines) against which performance is measured and changes to the scope, schedule and cost of a project are managed and controlled. Risk analysis is often performed as the final element of the scheduling or estimating processes, a precursor to establishing cost and schedule contingency. However, best business practices dictate that information that may be crucial to the success of a project be analyzed and incorporated into project planning as soon as it is available and usable. The purpose or risk management is not to eliminate risk. Neither is it intended to suggest wholesale re-estimating and re-scheduling of a project. Rather, the intent is to make provisions to reduce and control the schedule and/or cost ramifications of risk by anticipating events and conditions that cannot be reliably planned for and which have the potential to negatively impact accomplishment of the technical objectives and requirements of the project

  14. The innovation and practice of management improved by integration management information system in nuclear enterprise

    International Nuclear Information System (INIS)

    Zhang Fan; Cheng Lihong; Li Qisheng; Ge Zhengfa

    2012-01-01

    This article expounds that Hunan Taohuajiang Nuclear Power Company generally programs the route of company's core business and implements its integration through referencing the experience of informationization construction of other enterprises at the beginning of the foundation of this company, and summarizes the experience of system construction and analyses the innovation and signification of the integrative management information system to the nu- clear power enterprise management from data unified, resources sharing and business electronic and the management improvement of this company. (authors)

  15. A Review of Ocean Management and Integrated Resource Management Programs from Around the World

    OpenAIRE

    , Seaplan

    2018-01-01

    This draft report is one of several prepared under contract to the Massachusetts Ocean Partnership (MOP) to support the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA) in its development of the integrated coastal ocean management plan mandated by the Massachusetts Oceans Act of 2008. The purpose of this report was to inventory and review ocean management and integrated resource management programs from around the world, including the United States, Europe, Australia...

  16. Role of plant pathology in integrated pest management.

    Science.gov (United States)

    Jacobsen, B J

    1997-01-01

    Integrated Pest Management (IPM) is a paradigm that is widely adopted by all pest control disciplines but whose early definitions and philosophical basis belong to entomologists. Plant pathology research and extension work has historically emphasized integration of several control strategies and fits both historical and modern definitions of IPM. While the term IPM has been used only sparingly in the phytopathology literature, the integrated disease management strategies emphasized are now considered to be at the forefront of ecologically based or biointensive pest management. While IPM is broadly endorsed by crop protection disciplines, farmers, other agriculturalists, and consumers, the potential for Integrated Pest Management has not been fully realized. Most IPM programs reflect a package of tools and decision aids for individual crop insect, weed, nematode, and plant disease management. IPM programs that integrate all types of pests with the agroecosystem, crop growth and loss models still await the formation of interdisciplinary teams focusing on growers needs. Lack of funding for both discipline and interdisciplinary developmental research and implementation is responsible for the paucity of comprehensive IPM programs for the majority of the U.S. crop acreage. This review explores the origins and evolution of the IPM paradigm and reviews efforts to achieve the body of knowledge and implementation structure to achieve IPM's full potential.

  17. Toward population management in an integrated care model.

    Science.gov (United States)

    Maddux, Franklin W; McMurray, Stephen; Nissenson, Allen R

    2013-01-01

    Under the Patient Protection and Affordable Care Act of 2010, accountable care organizations (ACOs) will be the primary mechanism for achieving the dual goals of high-quality patient care at managed per capita costs. To achieve these goals in the newly emerging health care environment, the nephrology community must plan for and direct integrated delivery and coordination of renal care, focusing on population management. Even though the ESRD patient population is a complex group with comorbid conditions that may confound integration of care, the nephrology community has unique experience providing integrated care through ACO-like programs. Specifically, the recent ESRD Management Demonstration Project sponsored by the Centers for Medicare & Medicaid Services and the current ESRD Prospective Payment System with it Quality Incentive Program have demonstrated that integrated delivery of renal care can be accomplished in a manner that provides improved clinical outcomes with some financial margin of savings. Moving forward, integrated renal care will probably be linked to provider performance and quality outcomes measures, and clinical integration initiatives will share several common elements, namely performance-based payment models, coordination of communication via health care information technology, and development of best practices for care coordination and resource utilization. Integration initiatives must be designed to be measured and evaluated, and, consistent with principles of continuous quality improvement, each initiative will provide for iterative improvements of the initiative. © 2013 S. Karger AG, Basel.

  18. IODP Expedition 319, NanTroSEIZE Stage 2: First IODP Riser Drilling Operations and Observatory Installation Towards Understanding Subduction Zone Seismogenesis

    Directory of Open Access Journals (Sweden)

    Sean Toczko

    2010-09-01

    Full Text Available The Nankai Trough Seismogenic Zone Experiment (NanTroSEIZE is a major drilling project designed to investigate fault mechanics and the seismogenic behavior of subduction zone plate boundaries. Expedition 319 is the first riser drilling operation within scientific ocean drilling. Operations included riser drilling at Site C0009 in the forearc basin above the plate boundary fault, non-riser drilling at Site C0010 across the shallow part of the megasplay faultsystem—which may slip during plate boundary earthquakes—and initial drilling at Site C0011 (incoming oceanic plate for Expedition 322. At Site C0009, new methods were tested, including analysis of drill mud cuttings and gas, and in situ measurements of stress, pore pressure, and permeability. These results, in conjunction with earlier drilling, will provide a the history of forearc basin development (including links to growth of the megasplay fault system and modern prism, b the first in situ hydrological measurements of the plate boundary hanging wall, and c integration of in situ stress measurements (orientation and magnitude across the forearc and with depth. A vertical seismic profile (VSP experiment provides improved constraints on the deeper structure of the subduction zone. At Site C0010, logging-while-drilling measurements indicate significantchanges in fault zone and hanging wall properties over short (<5 km along-strike distances, suggesting different burial and/or uplift history. The first borehole observatory instruments were installed at Site C0010 to monitor pressure and temperature within the megasplay fault zone, and methods of deployment of more complex observatoryinstruments were tested for future operations.

  19. A SURVEY ON INDIAN EXPERIENCE ON INTEGRATED MANAGEMENT STANDARDS (IMS

    Directory of Open Access Journals (Sweden)

    H. Khanna

    2009-09-01

    Full Text Available Adoption of management systems standards is a key issue in manufacturing industry in India. Following the global trend quality and environmental issues are gaining importance. However the number of ISO 14001 certified companies are much less in India as compared to ISO 9001. The integration of ISO 14001 with ISO 9001 may help companies to sustain competitive advantage and overcome disappointments with quality standards and in turn encourage companies to adopt good environmental practices. The aim of this research is to study the implementation of integrated management standards (IMS by the manufacturing organizations in India. The different aspects of integration and benefits of IMS implementation are analyzed. This r esearch is based on empirical study carried out in Indian manufacturing firms, involving the application of a questionnaire. This questionnaire was tested on 50 manufacturing companies in India. The study reveals that focus on stakeholders; top management commitment and training are critical success factors for implementation of IMS. The main benefits of integration are discussed. The small sample size is one of the major limitations of this study. The paper informs the managers in manufacturing organizations and practitioners of management system standards especially in developing countries about IMS and will enable them to adopt IMS in future so that those organizations may not implement multiple and overlapping MSS(Management System Standards.

  20. Pipeline four-dimension management is the trend of pipeline integrity management in the future

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Feifan; Zhongchen, Han [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    Pipeline integrity management is essential for today's operators to operate their pipelines safety and cost effectively. The latest developments of pipeline integrity management around the world are involved with change of regulation, industry standard and innovation of technology. And who know the trend of PIM in the future, which can be answered in the paper. As a result, the concept of P4DM was set up firstly in the world. The paper analyzed the pipeline HSE management, pipeline integrity management (PIM) and asset integrity management (AIM), the problem of management was produced, and also the Pipeline 4-dimension Management (P4DM) theory was brought forward. According to P4DM, from the hierarchy of P4DM, the management elements, fields, space and time was analyzed. The main content is P4DM integrate the space geography location and time, control and manage the pipeline system in whole process, anywhere and anytime. It includes the pipeline integrity, pipeline operation and emergency, which is integrated by IT system. It come true that the idea, solution, technology, organization, manager alternately intelligently control the process of management. What the paper talks about included the definition of pipeline 4D management, the research develop of P4DM, the theory of P4DM, the relationship between P4DM and PIM, the technology basis of P4DM, how to perform the P4DM and conclusion. The P4DM was produced, which provide the development direction of PIM in the future, and also provide the new ideas for PetroChina in the field of technology and management. (author)

  1. The teaching of nursing management in undergraduate: an integrative review

    Directory of Open Access Journals (Sweden)

    Mara Solange Gomes Dellaroza

    2015-03-01

    Full Text Available The study aims to identify the dynamics of teaching management in nursing degree. It is an integrative literature review with research conducted in the following online database platforms: SciELO, Medline, Lilacs and BDENF. The keywords used in the study were: competency-based education, professional competence, education, nursing, organization and administration, management, nursing, educational assessment, organization of management services, management of professional practice and education. All articles published in the last 10 years which answered the question presented to approach the teaching of nursing management in Brazil, published in any language were included. Those that were not presented in full text were excluded. Of the 1432 studies identified after matching the keywords, only 8 were selected for answering objective of this review. From these results, three related themes emerged: the teaching plans, workload and program content; methodologies of teaching and learning in nursing management; challenges faced in developing the teaching of nursing management.

  2. Integrated forest management to prevent wildfires under Mediterranean environments

    Directory of Open Access Journals (Sweden)

    Piermaria Corona

    2015-02-01

    Full Text Available This review presents a multidisciplinary framework for integrating the ecological, regulatory, procedural and technical aspects of forest management for fires prevention under Mediterranean environments. The aims are to: i provide a foreground of wildfire scenario; ii illustrate the theoretical background of forest fuel management; iii describe the available fuel management techniques and mechanical operations for fire prevention in forest and wildland-urban interfaces, with exemplification of case-studies; iv allocate fire prevention activities under the hierarchy of forest planning. The review is conceived as an outline commentary discussion targeted to professionals, technicians and government personnel involved in forestry and environmental management.

  3. Intellectual capital management as the integral part of enterprise’s management

    OpenAIRE

    Аліна Олександрівна Осаул

    2016-01-01

    The main levels of the enterprise’s intellectual capital management are analyzed in the article. The distinctive peculiarities of the enterprise’s intellectual capital management are mentioned. Goals and benefits of the intellectual management system are determined. The ways of their improvement are pointed out. Implicit and explicit knowledge as an important integral intellectual capital resources are divided and characterized

  4. Integrating fire management into land management planning for west-side forests

    Science.gov (United States)

    Peter D. Teensma

    1996-01-01

    Fire management's integration into land management planning is critical to the successful management of nearly all wildland ecosystems, including westside forests, which lie west of the Cascade crest in Oregon and the northern coastal ranges in California. Restoration and maintenance of fire as an ecosystem process is critical to retention of biological diversity...

  5. Total Quality Management and Organizational Behavior Management: An Integration for Continual Improvement.

    Science.gov (United States)

    Mawhinney, Thomas C.

    1992-01-01

    The history and main features of organizational behavior management (OBM) are compared and integrated with those of total quality management (TQM), with emphasis on W.E. Deming's 14 points and OBM's operant-based approach to performance management. Interventions combining OBM, TQM, and statistical process control are recommended. (DB)

  6. Asset management: integrated software optimizes production performance

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.

    1998-06-01

    Two new multi-dimensional databases, which expand the `row and column` concept of spreadsheets into multiple categories of data called dimensions, are described. These integrated software packages provide the foundation for industry players such as Poco Petroleum Ltd and Numac Energy Inc to gain a competitive advantage, by overhauling their respective data collection and retrieval systems to allow for timely cost analysis and financial reporting. Energy Warehouse, an on-line analytical processing product marketed by SysGold Ltd, is one of the software products described. It gathers various sources of information, allows advanced searches and generates reports previously unavailable in other conventional financial accounting systems. The second product discussed - the Canadian Upstream Energy System (CUES) - is an on-line analytical processing system developed by Oracle Corporation and Calgary-based Applied Terravision Systems (ATS) Inc. CUES combines Oracle`s universal data server and software development tools with ATS`s upstream financial, land, geotechnical and production applications. The software also allows for optimization of facilities, analysis of production efficiencies and comparison of performance against industry standards.

  7. SYSTEMS FOR IMPROVEMENT OF BUSINESS INTEGRATED MANAGEMENT PROCESSES IN PORTS

    Directory of Open Access Journals (Sweden)

    Pavle Popovic

    2017-03-01

    Full Text Available Based on test results obtained so far, the objective relating to modern scientific methods and approaches has been defined with the intention to develop model which defines new management system integration model, by adopting necessary practical terms of real systems that most frequently circulate in maritime practice in the field of integrated management systems (IMS in terms of safety and security of vessels and ports. The subject of research is maritime, particularly port services, by way of defining internal and external advantages through adopting integrated management systems. The research will be conducted through theoretical and applied assessments of case study analyses using example of the Port of Kotor H.Co.

  8. THE MANAGEMENT ACCOUNTING TOOLS AND THE INTEGRATED REPORTING

    Directory of Open Access Journals (Sweden)

    Gabriel JINGA

    2015-04-01

    Full Text Available During the recent years the stakeholders are asking for other pieces of information to be published along with the financial one, such as risk reporting, intangibles, social and environmental accounting. The type of corporate reporting which incorporates the elements enumerated above is the integrated reporting. In this article, we argue that the information disclosed in the integrated reports is prepared by the management accounting, not only by the financial accounting. Thus, we search for the management accounting tools which are used by the companies which prepare integrated reports. In order to do this, we analytically reviewed all the reports available on the website of a selected company. Our results show that the company is using most of the management accounting tools mentioned in the literature review part.

  9. Managing Key Risks in Post-Merger IS Integration

    DEFF Research Database (Denmark)

    Alaranta, Mar; Mathiassen, L

    2014-01-01

    Mergers and acquisitions (M&A) require organizations to blend together different information system (IS) configurations. Unfortunately, less than 50 percent of M&A's achieve their goals, with IS integration being a major problem. Here, the authors offer a framework to help managers prepare for......, analyze, and mitigate risks during post-merger IS integration. They identify key risks relating to IS integration content, process, and context, and present five strategies for mitigating those risks. Their framework aims to help managers proactively reduce the impact of adverse events. Adopting...... the framework supported by their templates is straightforward and the time and resources required are minimal. When properly executed, adoption increases the likelihood of successful merger outcomes; the framework is thus a valuable addition to the management tool box and can be applied in collaboration...

  10. IMPLEMENTATION OF INTEGRAL SYSTEM OF QUALITY MANAGEMENT IN TOURISM

    Directory of Open Access Journals (Sweden)

    Vidoje Vujic

    2007-12-01

    Full Text Available Theory and practice have corroborated the need and usefulness of an integral approach to quality management in tourist destinations, since the destination and its touristic offer define a number of disparate participants and interested parties. An integral system of quality management is one of the models of touristic management that with the implementation of contemporary principles strives to achieve business excellence and competitory advantage. The paper determines and projects the need and importance of implementing an integral system and accordingly seeks to form a model for its development. By studying the oneness of the whole we have established the dependence and firm connections between particular norms and elements, and by analyzing them in this paper we describe the structure and associated characteristics of the whole.

  11. Integrated Constructed Wetlands (ICW) for livestock wastewater management.

    Science.gov (United States)

    Harrington, Rory; McInnes, Robert

    2009-11-01

    Social, economic and environmental coherence is sought in the management of livestock wastewater. Wetlands facilitate the biogeochemical processes that exploit livestock wastewater and provide opportunities to achieve such coherence and also to deliver on a range of ecosystem services. The Integrated Constructed Wetland (ICW) concept integrates three inextricably linked objectives: water quantity and quality management, landscape-fit to improve aesthetic site values and enhanced biodiversity. The synergies derived from this explicit integration allow one of the key challenges for livestock management to be addressed. An example utilizing twelve ICW systems from a catchment on the south coast of Ireland demonstrates that over an eight year period mean reduction of total and soluble phosphorus (molybdate reactive phosphorus) exceeded 95% and the mean removal of ammonium-N exceeded 98%. This paper reviews evidence regarding the capacity of ICWs to provide a coherent and sustainable alternative to conventional systems.

  12. Environmental Management Integration Project/Mixed Waste Focus Area Partnership

    International Nuclear Information System (INIS)

    Gombert, D.; Kristofferson, K.; Cole, L.

    1999-01-01

    On January 16, 1998, the Assistant Secretary for the Environmental Management (EM) Program at the Department of Energy, issued DOE-Idaho the Program Integration and Systems Engineering Guidance for Fiscal Year 1998, herein called Guidance, which directed that program integration tasks be performed for all EM program areas. This guidance directed the EM Integration team, as part of the Task 1, to develop baseline waste and material disposition maps which are owned by the site Project Baseline Summary (PBS) manager. With these baselines in place Task 2 gave direction to link Science and Technology activities to the waste and material stream supported by that technology. This linkage of EM Program needs with the OST activities supports the DOE goal of maximizing cleanup at DOE sites by 2006 and provides a defensible science and technology program. Additionally, this linkage is a valuable tool in the integration of the waste and material disposition efforts for the DOE complex

  13. Integrating environment health and safety management at Petro-Canada

    International Nuclear Information System (INIS)

    Raymond, G.

    1993-01-01

    Petro-Canada has developed a tool to integrate, measure, and improve its management systems of environment, health, and safety (EH ampersand S). This tool, called the Total Loss Management System, is described in the areas of general management issues, policies and procedures, evaluations, organization, stewardship, issue management, and performance measures. Petro-Canada's policies on occupational health and safety are consistent with its environmental policy, being structured in the same way. An integrated audit system is used to cover health, safety, industrial hygiene, reliability, environment, and risk management. EH ampersand S matters are integrated at the corporate level in a separate department. Regional divisions review EH ampersand S performance every month, incidents are discussed, and preventive measures are taken as necessary. Regional performances are combined every quarter for ultimate presentation to the Petro-Canada board. New or emerging issues that may affect divisions are assigned an issue sponsor, a member of divisional management who makes sure the issue receives the resources necessary to study and define its impact. Examples of issues include soil contamination, process hazard management, and benzene exposure limits. Performance measures flow from the corporate environment and occupational health and safety policies, and come in two types: those that measure activities to improve performance and those that measure the outcome of the activities

  14. Integrated risk management for business survival

    International Nuclear Information System (INIS)

    Piatt, J.A.

    1992-06-01

    During the recent recession, many businesses have had to take severe measures to cut costs. The Department of Defense has also been faced with the need to cut costs to offset the expense of the Gulf War and a shrinking budget due to the fall of communism around the world. With the collapse of the Warsaw Pact and dissolution of the Soviet Union, there has been an increasing demand to reduce the defense budget to provide the so-called ''peace dividend'' to deal with social and economic problems at home. President Bush's State of the Union Message in February 1992 called for deeper cuts than the 25% previously anticipated. It also called for these cuts to occur sooner than expected with $50 billion in defense cuts anticipated over the fiscal 1992--1997 period. The Department of Defense plan for force resizing calls for 25-30% reductions over time. This report discusses how the department of defense is trying to deal with the management of this crisis

  15. Integration of Biosafety into Core Facility Management

    Science.gov (United States)

    Fontes, Benjamin

    2013-01-01

    This presentation will discuss the implementation of biosafety policies for small, medium and large core laboratories with primary shared objectives of ensuring the control of biohazards to protect core facility operators and assure conformity with applicable state and federal policies, standards and guidelines. Of paramount importance is the educational process to inform core laboratories of biosafety principles and policies and to illustrate the technology and process pathways of the core laboratory for biosafety professionals. Elevating awareness of biohazards and the biosafety regulatory landscape among core facility operators is essential for the establishment of a framework for both project and material risk assessment. The goal of the biohazard risk assessment process is to identify the biohazard risk management parameters to conduct the procedure safely and in compliance with applicable regulations. An evaluation of the containment, protective equipment and work practices for the procedure for the level of risk identified is facilitated by the establishment of a core facility registration form for work with biohazards and other biological materials with potential risk. The final step in the biocontainment process is the assumption of Principal Investigator role with full responsibility for the structure of the site-specific biosafety program plan by core facility leadership. The presentation will provide example biohazard protocol reviews and accompanying containment measures for core laboratories at Yale University.

  16. Commercial Aircraft Integrated Vehicle Health Management Study

    Science.gov (United States)

    Reveley, Mary S.; Briggs, Jeffrey L.; Evans, Joni K.; Jones, Sharon Monica; Kurtoglu, Tolga; Leone, Karen M.; Sandifer, Carl E.; Thomas, Megan A.

    2010-01-01

    Statistical data and literature from academia, industry, and other government agencies were reviewed and analyzed to establish requirements for fixture work in detection, diagnosis, prognosis, and mitigation for IVHM related hardware and software. Around 15 to 20 percent of commercial aircraft accidents between 1988 and 2003 involved inalftfnctions or failures of some aircraft system or component. Engine and landing gear failures/malfunctions dominate both accidents and incidents. The IVI vl Project research technologies were found to map to the Joint Planning and Development Office's National Research and Development Plan (RDP) as well as the Safety Working Group's National Aviation Safety Strategic. Plan (NASSP). Future directions in Aviation Technology as related to IVHlvl were identified by reviewing papers from three conferences across a five year time span. A total of twenty-one trend groups in propulsion, aeronautics and aircraft categories were compiled. Current and ftiture directions of IVHM related technologies were gathered and classified according to eight categories: measurement and inspection, sensors, sensor management, detection, component and subsystem monitoring, diagnosis, prognosis, and mitigation.

  17. Integrated risk management for business survival

    Energy Technology Data Exchange (ETDEWEB)

    Piatt, J.A.

    1992-06-01

    During the recent recession, many businesses have had to take severe measures to cut costs. The Department of Defense has also been faced with the need to cut costs to offset the expense of the Gulf War and a shrinking budget due to the fall of communism around the world. With the collapse of the Warsaw Pact and dissolution of the Soviet Union, there has been an increasing demand to reduce the defense budget to provide the so-called peace dividend'' to deal with social and economic problems at home. President Bush's State of the Union Message in February 1992 called for deeper cuts than the 25% previously anticipated. It also called for these cuts to occur sooner than expected with $50 billion in defense cuts anticipated over the fiscal 1992--1997 period. The Department of Defense plan for force resizing calls for 25-30% reductions over time. This report discusses how the department of defense is trying to deal with the management of this crisis.

  18. Integrated risk management for business survival

    Energy Technology Data Exchange (ETDEWEB)

    Piatt, J.A.

    1992-06-01

    During the recent recession, many businesses have had to take severe measures to cut costs. The Department of Defense has also been faced with the need to cut costs to offset the expense of the Gulf War and a shrinking budget due to the fall of communism around the world. With the collapse of the Warsaw Pact and dissolution of the Soviet Union, there has been an increasing demand to reduce the defense budget to provide the so-called ``peace dividend`` to deal with social and economic problems at home. President Bush`s State of the Union Message in February 1992 called for deeper cuts than the 25% previously anticipated. It also called for these cuts to occur sooner than expected with $50 billion in defense cuts anticipated over the fiscal 1992--1997 period. The Department of Defense plan for force resizing calls for 25-30% reductions over time. This report discusses how the department of defense is trying to deal with the management of this crisis.

  19. Regional Integrated Silvopastoral Approaches to Ecosystem Management Project

    OpenAIRE

    CIPAV (Centre For Research on Sustainable Agricultural Production Systems); CATIE (Centro Agronomico Tropical de Investigacion y Ensenanza); NITLAPAN

    2007-01-01

    Metadata only record The Regional Integrated Silvopastoral Approaches to Ecosystem Management Project introduces the payment for environmental services approach to silvopastoral farmers in Colombia, Costa Rica, and Nicaragua. The objectives of the project are to "demonstrate and measure a) the effects the introduction of payment incentives for environmental services to farmers on their adoption of integrated silvopastoral farming systems in degraded pasture lands; and b) the resulting impr...

  20. Science of Integrated Approaches to Natural Resources Management

    Science.gov (United States)

    Tengberg, Anna; Valencia, Sandra

    2017-04-01

    To meet multiple environmental objectives, integrated programming is becoming increasingly important for the Global Environmental Facility (GEF), the financial mechanism of the multilateral environmental agreements, including the United Nations Convention to Combat Desertification (UNCCD). Integration of multiple environmental, social and economic objectives also contributes to the achievement of the Sustainable Development Goals (SDGs) in a timely and cost-effective way. However, integration is often not well defined. This paper therefore focuses on identifying key aspects of integration and assessing their implementation in natural resources management (NRM) projects. To that end, we draw on systems thinking literature, and carry out an analysis of a random sample of GEF integrated projects and in-depth case studies demonstrating lessons learned and good practices in addressing land degradation and other NRM challenges. We identify numerous challenges and opportunities of integrated approaches that need to be addressed in order to maximise the catalytic impact of the GEF during problem diagnosis, project design, implementation and governance. We highlight the need for projects to identify clearer system boundaries and main feedback mechanisms within those boundaries, in order to effectively address drivers of environmental change. We propose a theory of change for Integrated Natural Resources Management (INRM) projects, where short-term environmental and socio-economic benefits will first accrue at the local level. Implementation of improved INRM technologies and practices at the local level can be extended through spatial planning, strengthening of innovation systems, and financing and incentive mechanisms at the watershed and/or landscape/seascape level to sustain and enhance ecosystem services at larger scales and longer time spans. We conclude that the evolving scientific understanding of factors influencing social, technical and institutional innovations and

  1. An integrated reliability management system for nuclear power plants

    International Nuclear Information System (INIS)

    Kimura, T.; Shimokawa, H.; Matsushima, H.

    1998-01-01

    The responsibility in the nuclear field of the Government, utilities and manufactures has increased in the past years due to the need of stable operation and great reliability of nuclear power plants. The need to improve the reliability is not only for the new plants but also for those now running. So, several measures have been taken to improve reliability. In particular, the plant manufactures have developed a reliability management system for each phase (planning, construction, maintenance and operation) and these have been integrated as a unified system. This integrated reliability management system for nuclear power plants contains information about plant performance, failures and incidents which have occurred in the plants. (author)

  2. Integrating Environmental and Information Systems Management: An Enterprise Architecture Approach

    Science.gov (United States)

    Noran, Ovidiu

    Environmental responsibility is fast becoming an important aspect of strategic management as the reality of climate change settles in and relevant regulations are expected to tighten significantly in the near future. Many businesses react to this challenge by implementing environmental reporting and management systems. However, the environmental initiative is often not properly integrated in the overall business strategy and its information system (IS) and as a result the management does not have timely access to (appropriately aggregated) environmental information. This chapter argues for the benefit of integrating the environmental management (EM) project into the ongoing enterprise architecture (EA) initiative present in all successful companies. This is done by demonstrating how a reference architecture framework and a meta-methodology using EA artefacts can be used to co-design the EM system, the organisation and its IS in order to achieve a much needed synergy.

  3. Integrated tracking, classification, and sensor management theory and applications

    CERN Document Server

    Krishnamurthy, Vikram; Vo, Ba-Ngu

    2012-01-01

    A unique guide to the state of the art of tracking, classification, and sensor management. This book addresses the tremendous progress made over the last few decades in algorithm development and mathematical analysis for filtering, multi-target multi-sensor tracking, sensor management and control, and target classification. It provides for the first time an integrated treatment of these advanced topics, complete with careful mathematical formulation, clear description of the theory, and real-world applications. Written by experts in the field, Integrated Tracking, Classification, and Sensor Management provides readers with easy access to key Bayesian modeling and filtering methods, multi-target tracking approaches, target classification procedures, and large scale sensor management problem-solving techniques.

  4. Integrated Management System – Scope, Possibilities And Methodology

    Directory of Open Access Journals (Sweden)

    Čekanová Katarína

    2015-06-01

    Full Text Available Organizations are becoming more aware of the importance of integrated management systems (IMS. Interest in this subject indicates that IMS are seen as “management systems of the future”. Based on this, the aim of this articles characterizes the possibility of building IMS through the identification of common elements and specific requirements in accordance with the ISO 9001, ISO 14001 and OHSAS 18001 professional references. Part of the article is the methodology of building IMS in the organization.

  5. Technology and diabetes self-management: An integrative review

    OpenAIRE

    Hunt, Caralise W

    2015-01-01

    Technology can be used to supplement healthcare provider diabetes care by providing both educational and motivational support. Education can be provided using technology allowing patients to learn new practices and routines related to diabetes management. Technology can support daily diabetes self-management activities including blood glucose monitoring, exercising, healthy eating, taking medication, monitoring for complications, and problem-solving. This article describes an integrative revi...

  6. ACCOUNTANT'S WARNING REGARDING THE LACK OF MANAGEMENT INTEGRITY

    Directory of Open Access Journals (Sweden)

    SORIN ADRIAN ACHIM

    2011-04-01

    Full Text Available This article highlights the challenges faced by accountants when they find that the integrity of company management is poor. The main problem is in relation with the accountants’ fear, mostly: suffering some repercussions from the disclosure of such information. Also, this article aims to emphasize the danger brought by covering and concealing incriminating information against the management; but also, how accountants could expose this information in such a way that they would not suffer, under no circumstances from such disclosures.

  7. Integration mockup and process material management system

    Science.gov (United States)

    Verble, Adas James, Jr.

    1992-01-01

    Work to define and develop a full scale Space Station Freedom (SSF) mockup with the flexibility to evolve into future designs, to validate techniques for maintenance and logistics and verify human task allocations and support trade studies is described. This work began in early 1985 and ended in August, 1991. The mockups are presently being used at MSFC in Building 4755 as a technology and design testbed, as well as for public display. Micro Craft also began work on the Process Material Management System (PMMS) under this contract. The PMMS simulator was a sealed enclosure for testing to identify liquids, gaseous, particulate samples, and specimen including, urine, waste water, condensate, hazardous gases, surrogate gasses, liquids, and solids. The SSF would require many trade studies to validate techniques for maintenance and logistics and verify system task allocations; it was necessary to develop a full scale mockup which would be representative of current SSF design with the ease of changing those designs as the SSF design evolved and changed. The tasks defined for Micro Craft were to provide the personnel, services, tools, and materials for the SSF mockup which would consist of four modules, nodes, interior components, and part task mockups of MSFC responsible engineering systems. This included the Engineering Control and Life Support Systems (ECLSS) testbed. For the initial study, the mockups were low fidelity, soft mockups of graphics art bottle, and other low cost materials, which evolved into higher fidelity mockups as the R&D design evolved, by modifying or rebuilding, an important cost saving factor in the design process. We designed, fabricated, and maintained the full size mockup shells and support stands. The shells consisted of cylinders, end cones, rings, longerons, docking ports, crew airlocks, and windows. The ECLSS required a heavier cylinder to support the ECLSS systems test program. Details of this activity will be covered. Support stands were

  8. 3D simulation of the catalyst density radial distribution in a riser of the FCC unit; Simulacao 3D da distribuicao radial de densidade do catalisador num riser de uma unidade de FCC

    Energy Technology Data Exchange (ETDEWEB)

    Apolonio, Adelia M.; Santos, Valdemir A. dos; Finkler, Christine L.L. [Universidade Catolica de Pernambuco (UNICAP), Recife, PE (Brazil); Dantas, Carlos C. [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil). Dept. de Energia Nuclear

    2008-07-01

    Local variations in the catalyst/vacuum gas oils mixing can lead to low conversions in some parts of a fluid cracking catalytic riser, while in other parts, high conversions will produce undesirable fuel gas and coke quantities. Knowledge of the apparent solid concentration in a cross-section of the riser is then essential. A computational program to generate tri dimensional graphics and level curves of the radial catalyst density in FCC risers was elaborated. The algorithm is based on determinations of the polynomial coefficients with aid of least square method and was tested with literature data, obtained by applications of nuclear technique of gamma radiation attenuation. The simulation results showed convergence with the experimental data. The precision of the mapping depends on the number of measurements and promote better conditions of diagnostic of the distribution catalyst type in the riser. (author)

  9. A system and approach for total pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd; Neidhardt, Dietmar [Tuboscope Pipeline Services, Houston, TX (United States); Gonzalez, Oscar [Tuboscope Mexico S.A. de C.V., Mexico, D.F. (Mexico)

    2005-07-01

    Pipeline rehabilitation and maintenance decisions are made using a wide variety of data, criteria, and expertise. The goal is to arrive at an optimal plan that considers risk and best return on Repair and Maintenance (R and M) expenditures for aging pipeline systems in both regulated and non-regulated environments. In order to achieve these goals, historical, operations, and assessment data is gathered, aligned and integrated as part of a baseline assessment. Integrity threats are identified based on operations and industry experience, and combined with potential consequences to public safety, the environment, and business to clearly delineate high risk exposure segments in the system. Integrity assessments are conducted in a prioritized manner, using the most appropriate technology and methods to address the threats. These include In Line Inspection technologies: MFL, Deformation, UT, INS (combinations thereof), Direct Assessment for EC and SCC threats, Hydro testing, and other indirect methods. From these results, decisions are made and R and M plans developed. To arrive at an optimal R and M plan, proper use of existing data, new integrity assessment data, and decision risk models is required. This paper presentation will detail the tactical aspect of an effective integrity management platform. Experience in decision support, operations priorities and execution of a rehabilitation plan using LinaView Pro{sup TM} integrity management system with risk-based integrity tools and maintenance planning will be presented. A process overview, results, and benefits will be given using these examples from operating oil and gas transmission pipelines. (author)

  10. Effects of Integrated Health Management Intervention on Overweight and Obesity

    Directory of Open Access Journals (Sweden)

    Yiting Yang

    2017-01-01

    Full Text Available Overweight or obese adults aged 20~55 years and living in Beijing more than one year were randomly divided into different management groups. A one-year integrated health management intervention was applied in the health management groups. The physical indicators and metabolic indicators changed after one-year intervention on the overweight and obese adults. The annual reduction of the physical indicators was significant in all groups (p<0.05 except the weight loss in the placebo + general management group. The health management and the dietary supplement have statistically significant (p<0.001, p<0.001 effects on the annual reduction of these indicators and interactive effect between them was found on some of these indicators such as bodyweight, body mass index (BMI, body fat ratio (BFR, and hipline (p<0.05. The dietary supplement + health management group had the best annual reduction effects for the indicators among the groups. Integrated health management interventions including both dietary supplements intervention and health management could improve metabolic indicators in overweight and obese adults together with the physical indicators, suggesting the intermediated role of metabolic indictors in controlling obesity.

  11. Integrated software system for low level waste management

    International Nuclear Information System (INIS)

    Worku, G.

    1995-01-01

    In the continually changing and uncertain world of low level waste management, many generators in the US are faced with the prospect of having to store their waste on site for the indefinite future. This consequently increases the set of tasks performed by the generators in the areas of packaging, characterizing, classifying, screening (if a set of acceptance criteria applies), and managing the inventory for the duration of onsite storage. When disposal sites become available, it is expected that the work will require re-evaluating the waste packages, including possible re-processing, re-packaging, or re-classifying in preparation for shipment for disposal under the regulatory requirements of the time. In this day and age, when there is wide use of computers and computer literacy is at high levels, an important waste management tool would be an integrated software system that aids waste management personnel in conducting these tasks quickly and accurately. It has become evident that such an integrated radwaste management software system offers great benefits to radwaste generators both in the US and other countries. This paper discusses one such approach to integrated radwaste management utilizing some globally accepted radiological assessment software applications

  12. Continuous improvement of the BNFL transport integrated management system

    International Nuclear Information System (INIS)

    Hale, J.A.

    1998-01-01

    The integrated Management System of BNFL Transport and Pacific Nuclear Transport Limited (PNTL) is subject to continuous improvement by the application of established improvement techniques adopted by BNFL. The technique currently being used is the application of a Total Quality Management (TQM) philosophy, involving the identification of key processes, benchmarking against existing measures, initiating various improvement projects and applying process changes within the Company. The measurement technique being used is based upon the European Foundation for Quality Management Model (EFQM). A major initiative was started in 1996 to include the requirements of the Environmental Management Systems standard ISO 14001 within the existing integrated management system. This resulted in additional activities added to the system, modification to some existing activities and additional training for personnel. The system was audited by a third party certification organisation, Lloyds Register Quality Assurance (LRQA), during 1997. This paper describes the arrangements to review and update the integrated management system of BNFL Transport and PNTL to include the requirements of the environmental standard ISO 14001 and it also discusses the continuous improvement process adopted by BNFL Transport. (authors)

  13. Nuclear power plant Angra integrated enterprise management system

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2009-01-01

    The characteristics and peculiarities of the Nuclear Power Plant ANGRA 3 enterprise, amongst which its technical complexity, the size of the project and of the supplies of goods and services contracted for for the Brazilian and foreign scopes, the variety of contractors and participants involved in the implementation, associated with the need of integrated management of all the activities of the enterprise, requires the setting of standardized criteria and procedures to be adopted by the enterprise Project Management Team and by all involved ELETRONUCLEAR (ETN) Units, Suppliers and Contractors for Brazilian and foreign goods and services for the execution of the activities related to overall enterprise planning. These criteria and procedures aim at covering the five Project Management Process Groups: Initiating Process Group, Planning Process Group, Execution Process Group, Monitoring and Controlling Process Group and Closing Process Group. For the ANGRA 3 enterprise, ETN developed the Integrated Enterprise Management System - INTEGRA, being the software 'Primavera Enterprise Project Management' a fundamental part of this system. The aim of this paper is to describe the main concepts involving the ANGRA 3 enterprise management, and the integration between the processes, including all disciplines in all phases of the enterprise life cycle, such as: Nuclear and Environmental Licensing, Infrastructure, National and Foreign Engineering, National and Import Supplies, Civil Works, Electromechanical Erection, Commissioning. (author)

  14. INNOVATION DEVELOPMENT MANAGEMENT IN VERTICALLY INTEGRATED HOLDING COMPANY

    Directory of Open Access Journals (Sweden)

    Natalya T. Uspenskaja

    2015-01-01

    Full Text Available The trend towards production consolidation and integration processes taking place both in the Russian and global economies leads to development of business associations, with a holding company being the most common form inRussiaand around the globe. The evidence in favor of the formation of holding companies is that they can benefit from the scale (bulk purchasing, centralized stuff training; in the global capital and exports markets they can be more effective than smaller businesses and, if non-profitable, a loss-making structure is easier to liquidate than the entire company; holding companies and associations can be an effective defender from political interference. As the importance of the well-functioning and harmonized procedure for the companies’ integration will increase (especially in the context of Russian business, where specific features of many areas of the production system imply the use of holding oligopolies as the most effective form of market structures, there is a need in their more profound study and, in particular, in the analysis of the most important technologies of the general integration procedure. The article outlines the relevance of innovative development management of vertically integrated holding systems, lists principles of innovative activity management and considers the features of innovation management of a vertically integrated holding company. The objective of the research is to study theoretical and practical aspects of innovative development management in vertically integrated holding systems. The object of research is management structures in innovative holding companies. While working on the article, the following methods of economic research were used: abstract and logical method, empirical method, method of expert evaluations, as well as methods of structural and functional and statistical analysis. 

  15. Integrating science and resource management in Tampa Bay, Florida

    Science.gov (United States)

    Yates, Kimberly K.; Greening, Holly; Morrison, Gerold

    2011-01-01

    Tampa Bay is recognized internationally for its remarkable progress towards recovery since it was pronounced "dead" in the late 1970s. Due to significant efforts by local governments, industries and private citizens throughout the watershed, water clarity in Tampa Bay is now equal to what it was in 1950, when population in the watershed was less than one-quarter of what it is today. Seagrass extent has increased by more than 8,000 acres since the mid-1980s, and fish and wildlife populations are increasing. Central to this successful turn-around has been the Tampa Bay resource management community's long-term commitment to development and implementation of strong science-based management strategies. Research institutions and agencies, including Eckerd College, the Florida Wildlife Commission Fish and Wildlife Research Institute, Mote Marine Laboratory, National Oceanic and Atmospheric Administration, the Southwest Florida Water Management District, University of South Florida, U.S. Environmental Protection Agency, U.S. Geological Survey, local and State governments, and private companies contribute significantly to the scientific basis of our understanding of Tampa Bay's structure and ecological function. Resource management agencies, including the Tampa Bay Regional Planning Council's Agency on Bay Management, the Southwest Florida Water Management District's Surface Water Improvement and Management Program, and the Tampa Bay Estuary Program, depend upon this scientific basis to develop and implement regional adaptive management programs. The importance of integrating science with management has become fully recognized by scientists and managers throughout the region, State and Nation. Scientific studies conducted in Tampa Bay over the past 10–15 years are increasingly diverse and complex, and resource management programs reflect our increased knowledge of geology, hydrology and hydrodynamics, ecology and restoration techniques. However, a synthesis of this

  16. Integrating environmental monitoring with cumulative effects management and decision making.

    Science.gov (United States)

    Cronmiller, Joshua G; Noble, Bram F

    2018-05-01

    Cumulative effects (CE) monitoring is foundational to emerging regional and watershed CE management frameworks, yet monitoring is often poorly integrated with CE management and decision-making processes. The challenges are largely institutional and organizational, more so than scientific or technical. Calls for improved integration of monitoring with CE management and decision making are not new, but there has been limited research on how best to integrate environmental monitoring programs to ensure credible CE science and to deliver results that respond to the more immediate questions and needs of regulatory decision makers. This paper examines options for the integration of environmental monitoring with CE frameworks. Based on semistructured interviews with practitioners, regulators, and other experts in the Lower Athabasca, Alberta, Canada, 3 approaches to monitoring system design are presented. First, a distributed monitoring system, reflecting the current approach in the Lower Athabasca, where monitoring is delegated to different external programs and organizations; second, a 1-window system in which monitoring is undertaken by a single, in-house agency for the purpose of informing management and regulatory decision making; third, an independent system driven primarily by CE science and understanding causal relationships, with knowledge adopted for decision support where relevant to specific management questions. The strengths and limitations of each approach are presented. A hybrid approach may be optimal-an independent, nongovernment, 1-window model for CE science, monitoring, and information delivery-capitalizing on the strengths of distributed, 1-window, and independent monitoring systems while mitigating their weaknesses. If governments are committed to solving CE problems, they must invest in the long-term science needed to do so; at the same time, if science-based monitoring programs are to be sustainable over the long term, they must be responsive to

  17. Integrated logistics management system for operation of machinery and equipment

    Directory of Open Access Journals (Sweden)

    Józef Frąś

    2014-09-01

    Full Text Available Background: The main issue in the operations of machinery and equipment, which is the subject of theoretical and empirical research is to provide high reliability and durability with qualitative post-trade services of machinery and equipment. Quality of service can be achieved through planned maintenance activities supported by computer technology. The article presents the concept of an integrated system of logistics management operation of machinery and equipment, especially special one for stationary transport equipment. At the outset, it emphasized the importance and essence of technological transport and storage systems storage in modern manufacturing enterprise. Then the objective and the method of research have been set. An essential part of deliberations in the article is the concept of integrated logistics management system operation for stationary transport equipment. Authors of this article have presented the results the implementation and operation of the system. The results are presented in a descriptive and graphic form. Methods: The purpose of this article is to present the concept of implementing an integrated logistics management system for operation of stationary transport equipment. It goes through combination of planning, event logging service, warehouse management in the field of spare parts, account and records of the cost of service activities. The paper presents an analysis and evaluation method of brainstorming a new approach to logistics management operation stationary transport equipment. Authors takes into account the specific conditions of use of transport equipment and conduct the service, which have a significant impact on the time and place of cost and service as well. It should be noted that the developed system has been implemented. It was also carried out an assessment of its functionality and efficiency as the new IT tool for logistics management operation. Results and conclusions: The paper presents a new

  18. Integrated Hydrographical Basin Management. Study Case - Crasna River Basin

    Science.gov (United States)

    Visescu, Mircea; Beilicci, Erika; Beilicci, Robert

    2017-10-01

    Hydrographical basins are important from hydrological, economic and ecological points of view. They receive and channel the runoff from rainfall and snowmelt which, when adequate managed, can provide fresh water necessary for water supply, irrigation, food industry, animal husbandry, hydrotechnical arrangements and recreation. Hydrographical basin planning and management follows the efficient use of available water resources in order to satisfy environmental, economic and social necessities and constraints. This can be facilitated by a decision support system that links hydrological, meteorological, engineering, water quality, agriculture, environmental, and other information in an integrated framework. In the last few decades different modelling tools for resolving problems regarding water quantity and quality were developed, respectively water resources management. Watershed models have been developed to the understanding of water cycle and pollution dynamics, and used to evaluate the impacts of hydrotechnical arrangements and land use management options on water quantity, quality, mitigation measures and possible global changes. Models have been used for planning monitoring network and to develop plans for intervention in case of hydrological disasters: floods, flash floods, drought and pollution. MIKE HYDRO Basin is a multi-purpose, map-centric decision support tool for integrated hydrographical basin analysis, planning and management. MIKE HYDRO Basin is designed for analyzing water sharing issues at international, national and local hydrographical basin level. MIKE HYDRO Basin uses a simplified mathematical representation of the hydrographical basin including the configuration of river and reservoir systems, catchment hydrology and existing and potential water user schemes with their various demands including a rigorous irrigation scheme module. This paper analyzes the importance and principles of integrated hydrographical basin management and develop a case

  19. The integration of intrapreneurship into a performance management model

    Directory of Open Access Journals (Sweden)

    Thabo WL Foba

    2007-02-01

    Full Text Available This study aimed to investigate the feasibility of using the dynamics of intrapreneurship to develop a new generation performance management model based on the structural dynamics of the Balanced Score Card approach. The literature survey covered entrepreneurship, from which the construct, intrapreneurship, was synthesized. Reconstructive logic and Hermeneutic methodology were used in studying the performance management systems and the Balanced Score Card approach. The dynamics were then integrated into a new approach for the management of performance of intrapreneurial employees in the corporate environment. An unstructured opinion survey followed: a sample of intrapreneurship students evaluated and validated the model’s conceptual feasibility and probable practical value.

  20. Integrated Management System, Configuration and Document Control for Research Reactors

    International Nuclear Information System (INIS)

    Steynberg, B.J.; Bruyn, J.F. du

    2017-01-01

    An integrated management system is a single management framework establishing all the processes necessary for the organisation to address all its goals and objectives. Very often only quality, environment and health & safety goals are included when referred to an integrated management system. However, within the research reactor environment such system should include goals pertinent to economic, environmental, health, operational, quality, safeguards, safety, security, and social considerations. One of the important objectives of an integrated management is to create the environment for a healthy safety culture. Configuration management is a disciplined process that involves both management and technical direction to establish and document the design requirements and the physical configuration of the research reactor and to ensure that they remain consistent with each other and the documentation. Configuration is the combination of the physical, functional, and operational characteristics of the structures, systems, and components (SSCs) or parts of the research reactor, operation, or activity. The basic objectives and general principles of configuration management are the same for all research reactors. The objectives of configuration management are to: a) Establish consistency among design requirements, physical configuration, and documentation (including analyses, drawings, and procedures) for the research reactor; b) Maintain this consistency throughout the life of the research reactor, particularly as changes are being made; and c) Retain confidence in the safety of the research reactor. The key elements needed to manage the configuration of research reactors are design requirements, work control, change control, document control, and configuration management assessments. The objective of document control is to ensure that only the most recently approved versions of documents are used in the process of operating, maintaining, and modifying the research reactor

  1. An integrative model of knowledge management and team work

    Directory of Open Access Journals (Sweden)

    Juan A. Marin-Garcia

    2008-10-01

    Full Text Available Human Resource Management relevance in Knowledge Management has been studied in academic literature mostly from the point of view of recruitment, selection, wages and salaries and career development processes. We have found few publications that are focused in the behaviour of the group of people who generate, share and transfer that knowledge while working in a team. The aim of this paper is to propose a framework that describes the relation between knowledge management and team work,, integrating Nonaka and Takeuchi, Leonard- Barton and Heisig framework proposals, as well as to outline some reflexions for further researches.

  2. Integrated groundwater management: An overview of concepts and challenges

    Science.gov (United States)

    Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew; Jakeman, Anthony J.; Barreteau, Olivier; Hunt, Randall J.; Rinaudo, Jean-Daniel; Ross, Andrew

    2016-01-01

    Managing water is a grand challenge problem and has become one of humanity’s foremost priorities. Surface water resources are typically societally managed and relatively well understood; groundwater resources, however, are often hidden and more difficult to conceptualize. Replenishment rates of groundwater cannot match past and current rates of depletion in many parts of the world. In addition, declining quality of the remaining groundwater commonly cannot support all agricultural, industrial and urban demands and ecosystem functioning, especially in the developed world. In the developing world, it can fail to even meet essential human needs. The issue is: how do we manage this crucial resource in an acceptable way, one that considers the sustainability of the resource for future generations and the socioeconomic and environmental impacts? In many cases this means restoring aquifers of concern to some sustainable equilibrium over a negotiated period of time, and seeking opportunities for better managing groundwater conjunctively with surface water and other resource uses. However, there are many, often-interrelated, dimensions to managing groundwater effectively. Effective groundwater management is underpinned by sound science (biophysical and social) that actively engages the wider community and relevant stakeholders in the decision making process. Generally, an integrated approach will mean “thinking beyond the aquifer”, a view which considers the wider context of surface water links, catchment management and cross-sectoral issues with economics, energy, climate, agriculture and the environment. The aim of the book is to document for the first time the dimensions and requirements of sound integrated groundwater management (IGM). The primary focus is on groundwater management within its system, but integrates linkages beyond the aquifer. The book provides an encompassing synthesis for researchers, practitioners and water resource managers on the concepts and

  3. Improving environmental impact assessmentfor better integrated coastal zone management

    NARCIS (Netherlands)

    Tiwi, D.A.

    2004-01-01

    How to make use of coastal and marine resources in a sustainable manner is an increasing concern among coastal stakeholders all over the world. Integrated Coastal Zone Management (ICZM) is a well-known concept nowadays, but its implementation is often hampered. This is also the case in Indonesia.

  4. Emergence of Integrated Water Resources Management : Measuring implementation in Vietnam

    NARCIS (Netherlands)

    Akkerman, M.; Khanh, N.T.; Witter, M.; Rutten, M.M.

    2015-01-01

    Recently, the changes in laws and regulations, such as the revised Law on Water Resources in 2012, have sought to provide a legal framework for the internationally recognized practices of Integrated Water Resources Management (IWRM) in Vietnam. With IWRM being a novel approach for Vietnam, it would

  5. An Integrated Model for Effective Knowledge Management in Chinese Organizations

    Science.gov (United States)

    An, Xiaomi; Deng, Hepu; Wang, Yiwen; Chao, Lemen

    2013-01-01

    Purpose: The purpose of this paper is to provide organizations in the Chinese cultural context with a conceptual model for an integrated adoption of existing knowledge management (KM) methods and to improve the effectiveness of their KM activities. Design/methodology/approaches: A comparative analysis is conducted between China and the western…

  6. Challenges of communicating integrated water resource management in Zimbabwe

    NARCIS (Netherlands)

    Marimbe, S.; Manzungu, E.

    2003-01-01

    With the promulgation of the 1998 Water Act the Government of Zimbabwe took a decisive step to reform the country's water sector, to bring it in line with contemporary socio-political realities obtaining in the country, and in tune with the philosophy of integrated water resources management.

  7. An Integrated Pest Management Tool for Evaluating Schools

    Science.gov (United States)

    Bennett, Blake; Hurley, Janet; Merchant, Mike

    2016-01-01

    Having the ability to assess pest problems in schools is essential for a successful integrated pest management (IPM) program. However, such expertise can be costly and is not available to all school districts across the United States. The web-based IPM Calculator was developed to address this problem. By answering questions about the condition of…

  8. Building an Integrative Model for Managing Exploratory Innovation

    DEFF Research Database (Denmark)

    Zarmeen, Parisha; Turri, Vanessa Gina; Sanchez, Ron

    2014-01-01

    central problems” organizations face when trying to manage innovation processes (Van de Ven, 1986). We develop an enhanced version of O’Connor’s (2008) Discovery, Incubation and Acceleration (DIA) model by integrating elements of Sanchez’ (2012) theory of architectural isomorphism as well as Markides...

  9. Transgenic plants as vital components of integrated pest management

    NARCIS (Netherlands)

    Kos, Martine; van Loon, J.J.A.; Dicke, M.; Vet, L.E.M.

    2009-01-01

    Although integrated pest management (IPM) strategies have been developed worldwide, further improvement of IPM effectiveness is required. The use of transgenic technology to create insect-resistant plants can offer a solution to the limited availability of highly insect-resistant cultivars.

  10. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    Science.gov (United States)

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  11. Effect of integrated pest management farmer field school (IPMFFS ...

    African Journals Online (AJOL)

    This research aimed to explore the effect of the Integrated Pest Management Farmer Field School (IPMFFS), on farmer knowledge, farmer group's ability, process of adoption and diffusion of IPM in Jember district. The population of the research was 556 farmer groups consisting of 22.240 farmers engaged in the IPMFFS in ...

  12. Supply Chain Management and Sustainability: Procrastinating Integration in Mainstream Research

    NARCIS (Netherlands)

    M.P. de Brito (Marisa); E.A. van der Laan (Erwin)

    2010-01-01

    textabstractResearch has pointed out opportunities and research agendas to integrate sustainability issues with supply chain and operations management. However, we find that it is still not mainstream practice to systematically take a sustainability approach in tackling supply chain and operations

  13. Software for the occupational health and safety integrated management system

    International Nuclear Information System (INIS)

    Vătăsescu, Mihaela

    2015-01-01

    This paper intends to present the design and the production of a software for the Occupational Health and Safety Integrated Management System with the view to a rapid drawing up of the system documents in the field of occupational health and safety

  14. Optimal control for integrated emission management in diesel engines

    NARCIS (Netherlands)

    Donkers, M.C.F.; van Schijndel, J.; Heemels, W.P.M.H.; Willems, F.

    2017-01-01

    Integrated Emission Management (IEM) is a supervisory control strategy that minimises operational costs (consisting of fuel and AdBlue) for diesel engines with an aftertreatment system, while satisfying emission constraints imposed by legislation. In most work on IEM, a suboptimal heuristic

  15. Optimal control for integrated emission management in diesel engines

    NARCIS (Netherlands)

    Donkers, M.C.F.; Schijndel, J. van; Heemels, W.P.M.H.; Willems, F.P.T.

    2016-01-01

    Integrated Emission Management (IEM) is a supervisory control strategy that minimises operational costs (consisting of fuel and AdBlue) for diesel engines with an aftertreatment system, while satisfying emission constraints imposed by legislation. In most work on IEM, a suboptimal heuristic

  16. Dynamic programming for Integrated Emission Management in diesel engines

    NARCIS (Netherlands)

    Schijndel, J. van; Donkers, M.C.F.; Willems, F.P.T.; Heemels, W.P.M.H.

    2014-01-01

    Integrated Emission Management (IEM) is a supervisory control strategy that aims at minimizing the operational costs of diesel engines with an aftertreatment system, while satisfying emission constraints imposed by legislation. In previous work on IEM, a suboptimal real-time implementable solution

  17. Integrated Communications at America's Leading Total Quality Management Corporations.

    Science.gov (United States)

    Gronstedt, Anders

    1996-01-01

    Examines how to create organizational processes that allow communication professionals with a variety of expertise to support each other through coordination and integration. Studies eight of America's leading total quality management corporations, including AT&T, Federal Express, Saturn, and Xerox. Explores how various total quality…

  18. The Integrated Management Of An Emerging Insect Pest Of Cashew ...

    African Journals Online (AJOL)

    Sudden death of mature cashew trees at the Cocoa Research Institute of Nigeria (CRIN), Ibadan, southwestern Nigeria, a tropical humid ecology, necessitated an urgent study to unravel the cause and evolve an integrated management strategy for the control of the problem. Morphometric examination of the adult insect ...

  19. Multiobjective decision-making in integrated water management

    NARCIS (Netherlands)

    Wind, H.G.; Pouwels, I.H.M.; Pouwels, I.H.M.; Witter, V.J.

    1995-01-01

    Traditionally, decision-making by water authorities in the Netherlands is largely based on intuition. Their tasks were, after all, relatively few and straight-forward. The growing number of tasks, together with the new integrated approach on water management issues, however, induces water

  20. Integrated fish management improves food security in the Bolivian ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2013-09-17

    Sep 17, 2013 ... An integrated approach to fish management can create a win–win solution to these issues. ... This was the first time a public event in Bolivia recognized the important role ... Download a PDF version of this article (245KB) ...

  1. Integrating Sustainability into Management Education: A Dean's Perspective

    Science.gov (United States)

    Walck, Christa

    2009-01-01

    The integration of sustainability and environmental ethics into management education has improved in the past decade. This is partly a response to external pressure, as societal concerns about sustainability grow and businesses have made greater efforts to green their processes and products. But it is also a response to internal pressure from…

  2. Integrated Nutrient and Water Management for Sustainable Food ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Integrated Nutrient and Water Management for Sustainable Food Production in the Sahel (CIFSRF). In the Sahel, agricultural production is strictly limited by drought and low soil fertility. In 2005 and 2010, these two factors led to food scarcity in Niger. However, innovative technologies such as microdose fertilization ...

  3. An integrated management systems approach to corporate social responsibility.

    NARCIS (Netherlands)

    Asif, M.; Searcy, C.; Zutshi, A.; Fisscher, O.A.M.

    2011-01-01

    A great deal of research has emphasized the strategic management of corporate social responsibility (CSR). However, gaps remain on how CSR can be effectively integrated with existing business processes. One key question remaining is how to design business processes so that they accommodate

  4. Integrating Indigenous Knowledge in Climate Risk Management in ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    27 mars 2008 ... Integrating Indigenous Knowledge in Climate Risk Management in support of Community Based Adaptation. Traditionally, African farmers have used indigenous knowledge to understand weather and climate patterns and make decisions about crop and irrigation cycles. However, increased variability ...

  5. Towards Integrated Pest Management in East Africa : a feasibility study

    NARCIS (Netherlands)

    Dijkxhoorn, Y.; Bremmer, J.; Kerklaan, E.

    2013-01-01

    Pesticide risk reduction through registration of less hazardous pesticides and the promotion of nonchemical pest and disease control approaches such as Integrated Pest Management (IPM) is essential for a more sustainable plant production in East Africa in order to enhance both export market access

  6. Thailand Environment Monitor : Integrated Water Resources Management - A Way Forward

    OpenAIRE

    World Bank

    2011-01-01

    Water is everyone's business. Beside a necessity for living, water has implications on public health and, most importantly, can cause social conflicts. This is because water is limited, is difficult to control, and can easily be polluted. The Integrated Water Resource Management (IWRM) process is considered worldwide as a means to reduce social conflicts from competing water needs as well ...

  7. Software for the occupational health and safety integrated management system

    Energy Technology Data Exchange (ETDEWEB)

    Vătăsescu, Mihaela [University Politehnica Timisoara, Department of Engineering and Management, 5 Revolutiei street, 331128 Hunedoara (Romania)

    2015-03-10

    This paper intends to present the design and the production of a software for the Occupational Health and Safety Integrated Management System with the view to a rapid drawing up of the system documents in the field of occupational health and safety.

  8. Technical Evaluation Report 29: Integrated Learning Management Systems

    Directory of Open Access Journals (Sweden)

    Linda Schwartz

    2004-04-01

    Full Text Available Four integrated learning management packages were reviewed: CentraOne, IntraLearn, Lyceum, and Silicon Chalk. These products provide different combinations of synchronous and asynchronous tools. The current report examines the products in relation to their specific value for distance educators and students.

  9. Advances in integrated fire management in central Mexico

    Science.gov (United States)

    Dante Arturo Rodríguez Trejo; Arturo Cruz Reyes

    2013-01-01

    This paper reports on the research and operational results of efforts made by some rural communities, the National Forestry Commission (CONAFOR), the Universidad Autónoma Chapingo (UACH) and other organizations to achieve integrated fire management in central Mexico. The research includes the latest results obtained by UACH's Ajusco Project on the subject, in both...

  10. Integrated management software files action in case of fire

    International Nuclear Information System (INIS)

    Moreno-Ventas Garcia, V.; Gimeno Serrano, F.

    2010-01-01

    The proper management of emergencies, is a challenge for which it is essential to be prepared. Integrated Software Performance Chips In case of fire and rapid access to information, make this application a must to effectively drive any emergency due to fire at any nuclear facility.

  11. Integrated management of Fusarium wilt of chickpea (Cicer ...

    African Journals Online (AJOL)

    user

    2013-07-17

    Jul 17, 2013 ... Key words: Integrated management, Fusarium wilt, Fusarium oxysporum f. sp. ciceris, chickpea (Cicer arietinum L.), antagonists, botanicals, fungicides. INTRODUCTION. Chickpea (Cicer arietinum L.) is a vital source of plant- derived edible protein in many countries. Chickpea also has advantages in the ...

  12. Integrated management of Fusarium wilt of chickpea ( Cicer ...

    African Journals Online (AJOL)

    The present study was carried out to assess the efficacy of an integrated management strategy for Fusarium wilt of chickpea that combined the use of microbial antagonist, botanical extract and fungicide. Before setting the experiment in field micro plots, a series of in vitro and in vivo experiments were conducted to select a ...

  13. A socioeconomic analysis of biocontrol in integrated pest management

    NARCIS (Netherlands)

    Benjamin, Emmanuel O.; Wesseler, Justus H.H.

    2016-01-01

    European regulations on the sustainable use of pesticides aim to promote integrated pest management (IPM) strategy and the use of biological control agents. However, uncertainty over benefits and costs, irreversibility effects as well as flexibility in adoption of this technology needs to be

  14. Using Student Managed Businesses to Integrate the Business Curriculum

    Science.gov (United States)

    Massad, Victor J.; Tucker, Joanne M.

    2009-01-01

    To teach business today requires that we go beyond classroom learning and encourage real world, cross-functional experiences and applied management decision-making. This paper describes an innovative approach that requires students to apply their function-specific knowledge of business, integrated with other functional areas, to an authentic…

  15. Integrating Records Management (RM) and Information Technology (IT)

    Energy Technology Data Exchange (ETDEWEB)

    NUSBAUM,ANNA W.; CUSIMANO,LINDA J.

    2000-03-02

    Records Managers are continually exploring ways to integrate their services with those offered by Information Technology-related professions to capitalize on the advantages of providing customers a total solution to managing their records and information. In this day and age, where technology abounds, there often exists a fear on the part of records management that this integration will result in a loss of identity and the focus of one's own mission - a fear that records management may become subordinated to the fast-paced technology fields. They need to remember there is strength in numbers and it benefits RM, IT, and the customer when they can bring together the unique offerings each possess to reach synergy for the benefit of all the corporations. Records Managers, need to continually strive to move ''outside the records management box'', network, expand their knowledge, and influence the IT disciplines to incorporate the concept of ''management'' into their customer solutions.

  16. Integrating geographically isolated wetlands into land management decisions

    Science.gov (United States)

    Golden, Heather E.; Creed, Irena F.; Ali, Genevieve; Basu, Nandita; Neff, Brian; Rains, Mark C.; McLaughlin, Daniel L.; Alexander, Laurie C.; Ameli, Ali A.; Christensen, Jay R.; Evenson, Grey R.; Jones, Charles N.; Lane, Charles R.; Lang, Megan

    2017-01-01

    Wetlands across the globe provide extensive ecosystem services. However, many wetlands – especially those surrounded by uplands, often referred to as geographically isolated wetlands (GIWs) – remain poorly protected. Protection and restoration of wetlands frequently requires information on their hydrologic connectivity to other surface waters, and their cumulative watershed‐scale effects. The integration of measurements and models can supply this information. However, the types of measurements and models that should be integrated are dependent on management questions and information compatibility. We summarize the importance of GIWs in watersheds and discuss what wetland connectivity means in both science and management contexts. We then describe the latest tools available to quantify GIW connectivity and explore crucial next steps to enhancing and integrating such tools. These advancements will ensure that appropriate tools are used in GIW decision making and maintaining the important ecosystem services that these wetlands support.

  17. Integrating Identity Management With Federated Healthcare Data Models

    Science.gov (United States)

    Hu, Jun; Peyton, Liam

    In order to manage performance and provide integrated services, health care data needs to be linked and aggregated across data sources from different organizations. The Internet and secure B2B networks offer the possibility of providing near real-time integration. However, there are three major stumbling blocks. One is to standardize and agree upon a common data model across organizations. The second is to match identities between different locations in order to link and aggregate records. The third is to protect identity and ensure compliance with privacy laws. In this paper, we analyze three main approaches to the problem and use a healthcare scenario to illustrate how each one addresses different aspects of the problem while failing to address others. We then present a systematic framework in which the different approaches can be flexibly combined for a more comprehensive approach to integrate identity management with federated healthcare data models.

  18. The role of business information management in advanced integrated environmental management systems

    DEFF Research Database (Denmark)

    Ulhøi, John Parm

    2000-01-01

    investments in the individual company. Secondly, based on the above, to calculate and assess some typical quantifiable savings, e.g. on energy and raw materials, over a period of four years (after the implementation of the integrated environmental management system). In line with other similar investigations......, the study shows that the implementation of systematic and integrated environmental management systems results in significant savings. This supports the general, albeit rarely tested, hypothesis that it pays to be an environmentally responsible enterprise....

  19. Barriers to Asthma Management for School Nurses: An Integrative Review.

    Science.gov (United States)

    Hanley Nadeau, Ellen; Toronto, Coleen E

    2016-04-01

    Childhood asthma is a growing health concern. Asthma is the most common chronic illness of childhood and a leading cause of emergency room visits, hospitalizations, and school absenteeism. School nurses play a valuable role in asthma management. The purpose of this integrative review is to examine barriers to asthma management for school nurses in the school setting. Findings revealed multiple barriers school nurses encounter in managing asthma. Six themes emerged that included lack of resources and support, insufficient time, communication challenges, limited knowledge, and lack of awareness of school nurses' expertise. Students, parents, primary care physicians, school administration, staff, and school nurses themselves all play a role in constructing barriers to asthma management. There is a need for school nurses and school nurse leaders to focus efforts to develop strategies to overcome barriers to ensure evidence-based, best practice management of asthma in the school setting. © The Author(s) 2015.

  20. Hanford Site waste management and environmental restoration integration plan

    International Nuclear Information System (INIS)

    Merrick, D.L.

    1990-01-01

    The ''Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs