WorldWideScience

Sample records for ringsail parachute deployed

  1. Estimates for the Aerodynamic Coefficients of Ringsail and Disk-Gap-Band Parachutes Operating on Mars

    Science.gov (United States)

    Cruz, Juan R.; Snyder, Miranda L.

    2017-01-01

    Models are presented for the aerodynamic coefficients of Supersonic Ringsail and Disk-Gap-Band parachutes as functions of total porosity, Lambda(sub t), Mach number, M, and total angle of attack, Alpha(sub t) (when necessary). The source aerodynamic coefficients data used for creating these models were obtained from a wind tunnel test of subscale parachutes. In this wind tunnel test, subscale parachutes of both parachute types were fabricated from two different fabrics with very different permeabilities. By varying the fabric permeability, while maintaining the parachute geometry constant, it was possible to vary Alpha(sub t). The fabric permeability test data necessary for the calculation of Alpha(sub t) were obtained from samples of the same fabrics used to fabricate the subscale parachutes. Although the models for the aerodynamic coefficients are simple polynomial functions of Alpha(sub t) and M, they are capable of producing good reproductions of the source data. The (Alpha(sub t), M) domains over which these models are applicable are clearly defined. The models are applicable to flight operations on Mars.

  2. Solid Rocket Booster Large Main and Drogue Parachute Reliability Analysis

    Science.gov (United States)

    Clifford, Courtenay B.; Hengel, John E.

    2009-01-01

    The parachutes on the Space Transportation System (STS) Solid Rocket Booster (SRB) are the means for decelerating the SRB and allowing it to impact the water at a nominal vertical velocity of 75 feet per second. Each SRB has one pilot, one drogue, and three main parachutes. About four minutes after SRB separation, the SRB nose cap is jettisoned, deploying the pilot parachute. The pilot chute then deploys the drogue parachute. The drogue chute provides initial deceleration and proper SRB orientation prior to frustum separation. At frustum separation, the drogue pulls the frustum from the SRB and allows the main parachutes that are mounted in the frustum to unpack and inflate. These chutes are retrieved, inspected, cleaned, repaired as needed, and returned to the flight inventory and reused. Over the course of the Shuttle Program, several improvements have been introduced to the SRB main parachutes. A major change was the replacement of the small (115 ft. diameter) main parachutes with the larger (136 ft. diameter) main parachutes. Other modifications were made to the main parachutes, main parachute support structure, and SRB frustum to eliminate failure mechanisms, improve damage tolerance, and improve deployment and inflation characteristics. This reliability analysis is limited to the examination of the SRB Large Main Parachute (LMP) and drogue parachute failure history to assess the reliability of these chutes. From the inventory analysis, 68 Large Main Parachutes were used in 651 deployments, and 7 chute failures occurred in the 651 deployments. Logistic regression was used to analyze the LMP failure history, and it showed that reliability growth has occurred over the period of use resulting in a current chute reliability of R = .9983. This result was then used to determine the reliability of the 3 LMPs on the SRB, when all must function. There are 29 drogue parachutes that were used in 244 deployments, and no in-flight failures have occurred. Since there are no

  3. Parachute systems for the atmospheric reentry of launcher upper stages

    Directory of Open Access Journals (Sweden)

    Bogdan DOBRESCU

    2017-03-01

    Full Text Available Parachute systems can be used to control the reentry trajectory of launcher upper stages, in order to lower the risks to the population or facilitate the retrieval of the stage. Several types of parachutes deployed at subsonic, supersonic and hypersonic speeds are analyzed, modeled as single and multistage systems. The performance of deceleration parachutes depends on their drag area and deployment conditions, while gliding parachutes are configured to achieve stable flight with a high glide ratio. Gliding parachutes can be autonomously guided to a low risk landing area. Sizing the canopy is shown to be an effective method to reduce parachute sensitivity to wind. The reentry trajectory of a launcher upper stage is simulated for each parachute system configuration and the results are compared to the nominal reentry case.

  4. A Review of the MLAS Parachute Systems

    Science.gov (United States)

    Taylor, Anthony P.; Kelley, Christopher; Magner, Eldred; Peterson, David; Hahn, Jeffrey; Yuchnovicz, Daniel E.

    2009-01-01

    The NASA Engineering and Safety Center (NESC) is developing the Max Launch Abort System (MLAS) as a risk-mitigation design should problems arise with the baseline Orion spacecraft launch abort design. The Max in MLAS is dedicated to Max Faget, the renowned NASA spacecraft designer. The MLAS flight test vehicle consists of boost skirt, coast skirt and the MLAS fairing which houses a full scale boilerplate Orion Crew Module (CM). The objective of the flight test is to prove that the CM can be released from the MLAS fairing during pad abort conditions without detrimental recontact between the CM and fairing, achieving performance similar to the Orion launch abort system. The boost and coast skirts provide the necessary thrust and stability to achieve the flight test conditions and are released prior to the test -- much like the Little Joe booster was used in the Apollo Launch Escape System tests. To achieve the test objective, two parachutes are deployed from the fairing to reorient the CM/fairing to a heatshield first orientation. The parachutes then provide the force necessary to reduce the total angle of attack and body angular rates required for safe release of the CM from the fairing. A secondary test objective after CM release from the fairing is to investigate the removal of the CM forward bay cover (FBC) with CM drogue parachutes for the purpose of attempting to synchronously deploying a set of CM main parachutes. Although multiple parachute deployments are used in the MLAS flight test vehicle to complete its objective, there are only two parachute types employed in the flight test. Five of the nine parachutes used for MLAS are 27.6 ft D(sub 0) ribbon parachutes, and the remaining four are standard G-12 cargo parachutes. This paper presents an overview of the 27.6 ft D(sub 0) ribbon parachute system employed on the MLAS flight test vehicle for coast skirt separation, fairing reorientation, and as drogue parachutes for the CM after separation from the fairing

  5. Application of Stereo PIV on a Supersonic Parachute Model

    Science.gov (United States)

    Wernet, Mark P.; Locke, Randy J.; Wroblewski, Adam; Sengupta, Anita

    2009-01-01

    The Mars Science Laboratory (MSL) is the next step in NASA's Mars Exploration Program, currently scheduled for 2011. The spacecraft's descent into the Martian atmosphere will be slowed from Mach 2 to subsonic speeds via a large parachute system with final landing under propulsive control. A Disk-Band-Gap (DBG) parachute will be used on MSL similar to the designs that have been used on previous missions, however; the DBG parachute used by MSL will be larger (21.5 m) than in any of the previous missions due to the weight of the payload and landing site requirements. The MSL parachute will also deploy at higher Mach number (M 2) than previous parachutes, which can lead to instabilities in canopy performance. Both the increased size of the DBG above previous demonstrated configurations and deployment at higher Mach numbers add uncertainty to the deployment, structural integrity and performance of the parachute. In order to verify the performance of the DBG on MSL, experimental testing, including acquisition of Stereo Particle Imaging Velocimetry (PIV) measurements were required for validating CFD predictions of the parachute performance. A rigid model of the DBG parachute was tested in the 10x10 foot wind tunnel at GRC. Prior to the MSL tests, a PIV system had never been used in the 10x10 wind tunnel. In this paper we discuss some of the technical challenges overcome in implementing a Stereo PIV system with a 750x400 mm field-of-view in the 10x10 wind tunnel facility and results from the MSL hardshell canopy tests.

  6. An Airborne Parachute Compartment Test Bed for the Orion Parachute Test Program

    Science.gov (United States)

    Moore, James W.; Romero, Leah M.

    2013-01-01

    The test program developing parachutes for the Orion/MPCV includes drop tests with parachutes deployed from an Orion-like parachute compartment at a wide range of dynamic pressures. Aircraft and altitude constraints precluded the use of an Orion boilerplate capsule for several test points. Therefore, a dart-shaped test vehicle with a hi-fidelity mock-up of the Orion parachute compartment has been developed. The available aircraft options imposed constraints on the test vehicle development and concept of operations. Delivery of this test vehicle to the desired velocity, altitude, and orientation required for the test is a di cult problem involving multiple engineering disciplines. This paper describes the development of the test technique. The engineering challenges include extraction from an aircraft, reposition of the extraction parachute, and mid-air separation of two vehicles, neither of which has an active attitude control system. The desired separation behavior is achieved by precisely controlling the release point using on-board monitoring of the motion. The design of the test vehicle is also described. The trajectory simulations and other analyses used to develop this technique and predict the behavior of the test vehicle are reviewed in detail. The application of the technique on several successful drop tests is summarized.

  7. Rocket-Powered Parachutes Rescue Entire Planes

    Science.gov (United States)

    2010-01-01

    Small Business Innovation Research (SBIR) contracts with Langley Research Center helped BRS Aerospace, of Saint Paul, Minnesota, to develop technology that has saved 246 lives to date. The company s whole aircraft parachute systems deploy in less than 1 second thanks to solid rocket motors and are capable of arresting the descent of a small aircraft, lowering it safely to the ground. BRS has sold more than 30,000 systems worldwide, and the technology is now standard equipment on many of the world s top-selling aircraft. Parachutes for larger airplanes are in the works.

  8. Damping Effects of Drogue Parachutes on Orion Crew Module Dynamics

    Science.gov (United States)

    Aubuchon, Vanessa V.; Owens, D. Bruce

    2016-01-01

    Because simulations of the Orion Crew Module (CM) dynamics with drogue parachutes deployed were under-predicting the amount of damping seen in free-flight tests, an attach-point damping model was applied to the Orion system. A key hypothesis in this model is that the drogue parachutes' net load vector aligns with the CM drogue attachment point velocity vector. This assumption seems reasonable and has historically produced good results, but has never been experimentally verified. The wake of the CM influences the drogue parachutes, which makes performance predictions of the parachutes difficult. Many of these effects are not currently modeled in the simulations. A forced oscillation test of the CM with parachutes was conducted in the NASA LaRC 20-Ft Vertical Spin Tunnel (VST) to gather additional data to validate and refine the attach-point damping model. A second loads balance was added to the original Orion VST model to measure the drogue parachute loads independently of the CM. The objective of the test was to identify the contribution of the drogues to CM damping and provide additional information to quantify wake effects and the interactions between the CM and parachutes. The drogue parachute force vector was shown to be highly dependent on the CM wake characteristics. Based on these wind tunnel test data, the attach-point damping model was determined to be a sufficient approximation of the parachute dynamics in relationship to the CM dynamics for preliminary entry vehicle system design. More wake effects should be included to better model the system.

  9. Aerodynamic Reconstruction Applied to Parachute Test Vehicle Flight Data Analysis

    Science.gov (United States)

    Cassady, Leonard D.; Ray, Eric S.; Truong, Tuan H.

    2013-01-01

    The aerodynamics, both static and dynamic, of a test vehicle are critical to determining the performance of the parachute cluster in a drop test and for conducting a successful test. The Capsule Parachute Assembly System (CPAS) project is conducting tests of NASA's Orion Multi-Purpose Crew Vehicle (MPCV) parachutes at the Army Yuma Proving Ground utilizing the Parachute Test Vehicle (PTV). The PTV shape is based on the MPCV, but the height has been reduced in order to fit within the C-17 aircraft for extraction. Therefore, the aerodynamics of the PTV are similar, but not the same as, the MPCV. A small series of wind tunnel tests and computational fluid dynamics cases were run to modify the MPCV aerodynamic database for the PTV, but aerodynamic reconstruction of the flights has proven an effective source for further improvements to the database. The acceleration and rotational rates measured during free flight, before parachute inflation but during deployment, were used to con rm vehicle static aerodynamics. A multibody simulation is utilized to reconstruct the parachute portions of the flight. Aerodynamic or parachute parameters are adjusted in the simulation until the prediction reasonably matches the flight trajectory. Knowledge of the static aerodynamics is critical in the CPAS project because the parachute riser load measurements are scaled based on forebody drag. PTV dynamic damping is critical because the vehicle has no reaction control system to maintain attitude - the vehicle dynamics must be understood and modeled correctly before flight. It will be shown here that aerodynamic reconstruction has successfully contributed to the CPAS project.

  10. Parachuting from fixed objects: descriptive study of 106 fatal events in BASE jumping 1981-2006.

    Science.gov (United States)

    Westman, A; Rosén, M; Berggren, P; Björnstig, U

    2008-06-01

    To analyse the characteristics of fatal incidents in fixed object sport parachuting (building, antenna, span, earth (BASE) jumping) and create a basis for prevention. Descriptive epidemiological study. Data on reported fatal injury events (n = 106) worldwide in 1981-2006 retrieved from the BASE fatality list. Human, equipment and environmental factors. Identification of typical fatal incident and injury mechanisms for each of the four fixed object types of BASE jumping (building, antenna, span, earth). Human factors included parachutist free fall instability (loss of body control before parachute deployment), free fall acrobatics and deployment failure by the parachutist. Equipment factors included pilot chute malfunction and parachute malfunction. In cliff jumping (BASE object type E), parachute opening towards the object jumped was the most frequent equipment factor. Environmental factors included poor visibility, strong or turbulent winds, cold and water. The overall annual fatality risk for all object types during the year 2002 was estimated at about one fatality per 60 participants. Participants in BASE jumping should target risk factors with training and technical interventions. The mechanisms described in this study should be used by rescue units to improve the management of incidents.

  11. Cirrus Airframe Parachute System and Odds of a Fatal Accident in Cirrus Aircraft Crashes.

    Science.gov (United States)

    Alaziz, Mustafa; Stolfi, Adrienne; Olson, Dean M

    2017-06-01

    General aviation (GA) accidents have continued to demonstrate high fatality rates. Recently, ballistic parachute recovery systems (BPRS) have been introduced as a safety feature in some GA aircraft. This study evaluates the effectiveness and associated factors of the Cirrus Airframe Parachute System (CAPS) at reducing the odds of a fatal accident in Cirrus aircraft crashes. Publicly available Cirrus aircraft crash reports were obtained from the National Transportation Safety Board (NTSB) database for the period of January 1, 2001-December 31, 2016. Accident metrics were evaluated through univariate and multivariate analyses regarding odds of a fatal accident and use of the parachute system. Included in the study were 268 accidents. For CAPS nondeployed accidents, 82 of 211 (38.9%) were fatal as compared to 8 of 57 (14.0%) for CAPS deployed accidents. After controlling for all other factors, the adjusted odds ratio for a fatal accident when CAPS was not deployed was 13.1. The substantial increased odds of a fatal accident when CAPS was not deployed demonstrated the effectiveness of CAPS at providing protection of occupants during an accident. Injuries were shifted from fatal to serious or minor with the use of CAPS and postcrash fires were significantly reduced. These results suggest that BPRS could play a significant role in the next major advance in improving GA accident survival.Alaziz M, Stolfi A, Olson DM. Cirrus Airframe Parachute System and odds of a fatal accident in Cirrus aircraft crashes. Aerosp Med Hum Perform. 2017; 88(6):556-564.

  12. Aerial Deployment and Inflation System for Mars Helium Balloons

    Science.gov (United States)

    Lachenmeler, Tim; Fairbrother, Debora; Shreves, Chris; Hall, Jeffery, L.; Kerzhanovich, Viktor V.; Pauken, Michael T.; Walsh, Gerald J.; White, Christopher V.

    2009-01-01

    A method is examined for safely deploying and inflating helium balloons for missions at Mars. The key for making it possible to deploy balloons that are light enough to be buoyant in the thin, Martian atmosphere is to mitigate the transient forces on the balloon that might tear it. A fully inflated Mars balloon has a diameter of 10 m, so it must be folded up for the trip to Mars, unfolded upon arrival, and then inflated with helium gas in the atmosphere. Safe entry into the Martian atmosphere requires the use of an aeroshell vehicle, which protects against severe heating and pressure loads associated with the hypersonic entry flight. Drag decelerates the aeroshell to supersonic speeds, then two parachutes deploy to slow the vehicle down to the needed safe speed of 25 to 35 m/s for balloon deployment. The parachute system descent dynamic pressure must be approximately 5 Pa or lower at an altitude of 4 km or more above the surface.

  13. Load Asymmetry Observed During Orion Main Parachute Inflation

    Science.gov (United States)

    Morris, Aaron L.; Taylor, Thomas; Olson, Leah

    2011-01-01

    The Crew Exploration Vehicle Parachute Assembly System (CPAS) has flight tested the first two generations of the Orion parachute program. Three of the second generation tests instrumented the dispersion bridles of the Main parachute with a Tension Measuring System. The goal of this load measurement was to better understand load asymmetry during the inflation process of a cluster of Main parachutes. The CPAS Main parachutes exhibit inflations that are much less symmetric than current parachute literature and design guides would indicate. This paper will examine loads data gathered on three cluster tests, quantify the degree of asymmetry observed, and contrast the results with published design guides. Additionally, the measured loads data will be correlated with videos of the parachute inflation to make inferences about the shape of the parachute and the relative load asymmetry. The goal of this inquiry and test program is to open a dialogue regarding asymmetrical parachute inflation load factors.

  14. Effect of hand paddles and parachute on butterfly coordination.

    Science.gov (United States)

    Telles, Thiago; Barroso, Renato; Barbosa, Augusto Carvalho; Salgueiro, Diego Fortes de Souza; Colantonio, Emilson; Andries Júnior, Orival

    2015-01-01

    This study investigated the effects of hand paddles, parachute and hand paddles plus parachute on the inter-limb coordination of butterfly swimming. Thirteen male swimmers were evaluated in four random maximal intensity conditions: without equipment, with hand paddles, with parachute and with hand paddles + parachute. Arm and leg stroke phases were identified by 2D video analysis to calculate the total time gap (T1: time between hands' entry in the water and high break-even point of the first undulation; T2: time between the beginning of the hand's backward movement and low break-even point of the first undulation; T3: time between the hand's arrival in a vertical plane to the shoulders and high break-even point of the second undulation; T4: time between the hand's release from the water and low break-even point of the second undulation). The swimming velocity was reduced and T1, T2 and T3 increased in parachute and hand paddles + parachute. No changes were observed in T4. Total time gap decreased in parachute and hand paddles + parachute. It is concluded that hand paddles do not influence the arm-to-leg coordination in butterfly, while parachute and hand paddles + parachute do change it, providing a greater propulsive continuity.

  15. FEAR AND ENTHUSIASM IN SPORT PARACHUTING,

    Science.gov (United States)

    Replies to a mail questionnaire by 825 sport parachutists affiliated with 103 parachute clubs are the data of this study. Questionnaires were...parachutists, attitudes relevant to sport parachuting, and included the Ma and Hy scales from the MMP1, a Draw-A-Person Test, and four story stimulus pictures

  16. Supersonic Testing of 0.8 m Disk Gap Band Parachutes in the Wake of a 70 Deg Sphere Cone Entry Vehicle

    Science.gov (United States)

    Sengupta, Anita; Wernet, Mark; Roeder, James; Kelsch, Richard; Witkowski, Al; Jones, Thomas

    2009-01-01

    Supersonic wind tunnel testing of Viking-type 0.8 m Disk-Gap-Band (DGB) parachutes was conducted in the NASA Glenn Research Center 10'x10' wind-tunnel. The tests were conducted in support of the Mars Science Laboratory Parachute Decelerator System development and qualification program. The aerodynamic coupling of the entry-vehicle wake to parachute flow-field is under investigation to determine the cause and functional dependence of a supersonic canopy breathing phenomenon referred to as area oscillations, characteristic of DGB's above Mach 1.5 operation. Four percent of full-scale parachutes (0.8 m) were constructed similar to the flight-article in material and construction techniques. The parachutes were attached to a 70-deg sphere-cone entry-vehicle to simulate the Mars flight configuration. The parachutes were tested in the wind-tunnel from Mach 2 to 2.5 in a Reynolds number range of 2x105 to 1x106, representative of a Mars deployment. Three different test configurations were investigated. In the first two configurations, the parachutes were constrained horizontally through the vent region to measure canopy breathing and wake interaction for fixed trim angles of 0 and 10 degrees from the free-stream. In the third configuration the parachute was unconstrained, permitted to trim and cone, similar to free-flight (but capsule motion is constrained), varying its alignment relative to the entry-vehicle wake. Non-intrusive test diagnostics were chosen to quantify parachute performance and provide insight into the flow field structure. An in-line loadcell provided measurement of unsteady and mean drag. Shadowgraph of the upstream parachute flow field was used to capture bow-shock motion and wake coupling. Particle image velocimetry provided first and second order flow field statistics over a planar region of the flow field, just upstream of the parachute. A photogrammetric technique was used to quantify fabric motion using multiple high speed video cameras to record

  17. Fluid-Structure Interaction Analysis of Parachute Finite Mass Inflation

    Directory of Open Access Journals (Sweden)

    Xinglong Gao

    2016-01-01

    Full Text Available Parachute inflation is coupled with sophisticated fluid-structure interaction (FSI and flight mechanic behaviors in a finite mass situation. During opening, the canopy often experiences the largest deformation and loading. To predict the opening phase of a parachute, a computational FSI model for the inflation of a parachute, with slots on its canopy fabric, is developed using the arbitrary Lagrangian-Euler coupling penalty method. In a finite mass situation, the fluid around the parachute typically has an unsteady flow; therefore, a more complex opening phase and FSI dynamics of a parachute are investigated. Navier-Stokes (N-S equations for uncompressible flow are solved using an explicit central difference method. The three-dimensional visualization of canopy deformation as well as the evolution of dropping velocity and overload is obtained and compared with the experimental results. This technique could be further applied in the airdrop test of a parachute for true prediction of the inflation characteristics.

  18. Reverse Launch Abort System Parachute Architecture Trade Study

    Science.gov (United States)

    Litton, Daniel K.; O'Keefe, Stephen A.; Winski, Richard G.

    2011-01-01

    This study investigated a potential Launch Abort System (LAS) Concept of Operations and abort parachute architecture. The purpose of the study was to look at the concept of jettisoning the LAS tower forward (Reverse LAS or RLAS) into the free-stream flow rather than after reorienting to a heatshield forward orientation. A hypothesized benefit was that due to the compressed timeline the dynamic pressure at main line stretch would be substantially less. This would enable the entry parachutes to be designed and sized based on entry loading conditions rather than the current stressing case of a Pad Abort. Ultimately, concerns about the highly dynamic reorientation of the CM via parachutes, and the additional requirement of a triple bridle attachment for the RLAS parachute system, overshadowed the potential benefits and ended this effort.

  19. 75 FR 47236 - Golden Parachute and Indemnification Payments

    Science.gov (United States)

    2010-08-05

    ... golden parachute, severance, indemnification or other agreement. Claims for employee welfare benefits or... legitimate employee severance payments and improper golden parachute payments. DATES: Comments must be... FICUs with greater clarity on the distinction between legitimate employee severance payments and...

  20. Parachute and lateral propping reactions in preterm children

    Directory of Open Access Journals (Sweden)

    Ohlweiler Lygia

    2002-01-01

    Full Text Available A non-controlled, prognostic cohort study was performed with the aim of establishing markers of neurological development and defining a clinical and epidemiological profile of preterm newborns at 3, 6, 9, and 12 months of gestation-corrected age in terms of parachute and lateral propping reactions. Newborns with gestational age of up to 36 weeks and 6 days, weighing 2,000 g or less at birth, were included in the study At 6 months of age, parachute and lateral propping reactions were present in 8.1% of the patients. At 9 months, the parachute reaction was present in 87.5%, and the lateral propping reaction was present in 90% of the children. It was possible to assess parachute and lateral propping reactions in preterm children in the first year of life. Alterations in trunk-limb coordination may be evidenced in the 1st year of life through postural reactions, which are maintained as prematurity markers until school age.

  1. Parachute Cord Tension Sensor

    Data.gov (United States)

    National Aeronautics and Space Administration — To design and fabricate a light weight (few oz), very small (~2 inch length) parachute cord tension sensor demonstrator device.A major challenge for the CPAS (The...

  2. Study of Pressure Oscillations in Supersonic Parachute

    Science.gov (United States)

    Dahal, Nimesh; Fukiba, Katsuyoshi; Mizuta, Kazuki; Maru, Yusuke

    2018-04-01

    Supersonic parachutes are a critical element of planetary mission whose simple structure, light-weight characteristics together with high ratio of aerodynamic drag makes them the most suitable aerodynamic decelerators. The use of parachute in supersonic flow produces complex shock/shock and wake/shock interaction giving rise to dynamic pressure oscillations. The study of supersonic parachute is difficult, because parachute has very flexible structure which makes obtaining experimental pressure data difficult. In this study, a supersonic wind tunnel test using two rigid bodies is done. The wind tunnel test was done at Mach number 3 by varying the distance between the front and rear objects, and the distance of a bundle point which divides suspension lines and a riser. The analysis of Schlieren movies revealed shock wave oscillation which was repetitive and had large pressure variation. The pressure variation differed in each case of change in distance between the front and rear objects, and the change in distance between riser and the rear object. The causes of pressure oscillation are: interaction of wake caused by front object with the shock wave, fundamental harmonic vibration of suspension lines, interference between shock waves, and the boundary layer of suspension lines.

  3. 14 CFR 65.115 - Senior parachute rigger certificate: Experience, knowledge, and skill requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Senior parachute rigger certificate... CREWMEMBERS Parachute Riggers § 65.115 Senior parachute rigger certificate: Experience, knowledge, and skill requirements. Except as provided in § 65.117, an applicant for a senior parachute rigger certificate must— (a...

  4. Risk Factors for Parachute Injuries and Airborne Student Observations on the Parachute Ankle Brace

    National Research Council Canada - National Science Library

    Knapik, Joseph J; Spiess, Anita; Darakjy, Salima; Grier, Tyson; Manning, Fred; Livingston, Elaine; Swedler, David; Amoroso, Paul; Jones, Bruce H

    2007-01-01

    ...) of the Defense Safety Oversight Council (DSOC) to evaluate the parachute ankle brace (PAB). Information provided by the questionnaire identified potential injury risk factors and comments on the PAB...

  5. Inflation of Unreefed and Reefed Extraction Parachutes

    Science.gov (United States)

    Ray, Eric S.; Varela, Jose G.

    2015-01-01

    Data from the Orion and several other test programs have been used to reconstruct inflation parameters for 28 ft Do extraction parachutes as well as the parent aircraft pitch response during extraction. The inflation force generated by extraction parachutes is recorded directly during tow tests but is usually inferred from the payload accelerometer during Low Velocity Airdrop Delivery (LVAD) flight test extractions. Inflation parameters are dependent on the type of parent aircraft, number of canopies, and standard vs. high altitude extraction conditions. For standard altitudes, single canopy inflations are modeled as infinite mass, but the non-symmetric inflations in a cluster are modeled as finite mass. High altitude extractions have necessitated reefing the extraction parachutes, which are best modeled as infinite mass for those conditions. Distributions of aircraft pitch profiles and inflation parameters have been generated for use in Monte Carlo simulations of payload extractions.

  6. Reconstruction of Twist Torque in Main Parachute Risers

    Science.gov (United States)

    Day, Joshua D.

    2015-01-01

    The reconstruction of twist torque in the Main Parachute Risers of the Capsule Parachute Assembly System (CPAS) has been successfully used to validate CPAS Model Memo conservative twist torque equations. Reconstruction of basic, one degree of freedom drop tests was used to create a functional process for the evaluation of more complex, rigid body simulation. The roll, pitch, and yaw of the body, the fly-out angles of the parachutes, and the relative location of the parachutes to the body are inputs to the torque simulation. The data collected by the Inertial Measurement Unit (IMU) was used to calculate the true torque. The simulation then used photogrammetric and IMU data as inputs into the Model Memo equations. The results were then compared to the true torque results to validate the Model Memo equations. The Model Memo parameters were based off of steel risers and the parameters will need to be re-evaluated for different materials. Photogrammetric data was found to be more accurate than the inertial data in accounting for the relative rotation between payload and cluster. The Model Memo equations were generally a good match and when not matching were generally conservative.

  7. Psychophysiological response in parachute jumps, the effect of experience and type of jump.

    Science.gov (United States)

    Clemente-Suárez, Vicente Javier; Robles-Pérez, José Juan; Fernández-Lucas, Jesús

    2017-10-01

    We aimed to analyse the effect of experience and type of parachute jump on the psychophysiological responses of jumpers. We analysed blood oxygen saturation, heart rate, blood glucose, lactate and creatinkinase, leg strength, isometric hand strength, cortical arousal, specific fine motor skills, self-confidence and cognition, and somatic and state anxiety, before and after four different parachute jumps: a sport parachute jump, a manual tactical parachute jump, tandem pilots, and tandem passengers. Independently of the parachute jump, the psychophysiological responses of experienced paratroopers were not affected by the jumps, except for an increase in anaerobic metabolism. Novice parachute jumpers presented a higher psychophysiological stress response than the experienced jumpers, together with a large anticipatory anxiety response before the jump; however, this decreased after the jump, although the high physiological activation was maintained. This information could be used by civil and military paratroopers' instructors to improve their training programmes. Copyright © 2017 Elsevier Inc. All rights reserved.

  8. Flight test of a spin parachute for use with a Super Arcas sounding rocket

    Science.gov (United States)

    Silbert, M. N.

    1975-01-01

    The development and flight testing of a specially configured 16.6 ft Disc Band Gap (DBG) Spin Parachute is discussed. The parachute is integrated with a modified Super Arcas launch vehicle. Total payload weight was 17.6 lbs including the Spin Parachute and a scientific payload, and lift-off weight was 100.3 lbs. The Super Arcas vehicle was despun from 18.4 cps. After payload separation at 244,170 ft the Spin Parachute and its payload attained a maximum spin rate of 2.4 cps. Total suspended weight of the Spin Parachute and its payload was 14.64 lbs.

  9. Study of parachute inflation process using fluid–structure interaction method

    Directory of Open Access Journals (Sweden)

    Yu Li

    2014-04-01

    Full Text Available A direct numerical modeling method for parachute is proposed firstly, and a model for the star-shaped folded parachute with detailed structures is established. The simplified arbitrary Lagrangian–Eulerian fluid–structure interaction (SALE/FSI method is used to simulate the inflation process of a folded parachute, and the flow field calculation is mainly based on operator splitting technique. By using this method, the dynamic variations of related parameters such as flow field and structure are obtained, and the load jump appearing at the end of initial inflation stage is captured. Numerical results including opening load, drag characteristics, swinging angle, etc. are well consistent with wind tunnel tests. In addition, this coupled method can get more space–time detailed information such as geometry shape, structure, motion, and flow field. Compared with previous inflation time method, this method is a completely theoretical analysis approach without relying on empirical coefficients, which can provide a reference for material selection, performance optimization during parachute design.

  10. Development of a Smart Release Algorithm for Mid-Air Separation of Parachute Test Articles

    Science.gov (United States)

    Moore, James W.

    2011-01-01

    The Crew Exploration Vehicle Parachute Assembly System (CPAS) project is currently developing an autonomous method to separate a capsule-shaped parachute test vehicle from an air-drop platform for use in the test program to develop and validate the parachute system for the Orion spacecraft. The CPAS project seeks to perform air-drop tests of an Orion-like boilerplate capsule. Delivery of the boilerplate capsule to the test condition has proven to be a critical and complicated task. In the current concept, the boilerplate vehicle is extracted from an aircraft on top of a Type V pallet and then separated from the pallet in mid-air. The attitude of the vehicles at separation is critical to avoiding re-contact and successfully deploying the boilerplate into a heatshield-down orientation. Neither the pallet nor the boilerplate has an active control system. However, the attitude of the mated vehicle as a function of time is somewhat predictable. CPAS engineers have designed an avionics system to monitor the attitude of the mated vehicle as it is extracted from the aircraft and command a release when the desired conditions are met. The algorithm includes contingency capabilities designed to release the test vehicle before undesirable orientations occur. The algorithm was verified with simulation and ground testing. The pre-flight development and testing is discussed and limitations of ground testing are noted. The CPAS project performed a series of three drop tests as a proof-of-concept of the release technique. These tests helped to refine the attitude instrumentation and software algorithm to be used on future tests. The drop tests are described in detail and the evolution of the release system with each test is described.

  11. Determination of Parachute Joint Factors using Seam and Joint Testing

    Science.gov (United States)

    Mollmann, Catherine

    2015-01-01

    This paper details the methodology for determining the joint factor for all parachute components. This method has been successfully implemented on the Capsule Parachute Assembly System (CPAS) for the NASA Orion crew module for use in determining the margin of safety for each component under peak loads. Also discussed are concepts behind the joint factor and what drives the loss of material strength at joints. The joint factor is defined as a "loss in joint strength...relative to the basic material strength" that occurs when "textiles are connected to each other or to metals." During the CPAS engineering development phase, a conservative joint factor of 0.80 was assumed for each parachute component. In order to refine this factor and eliminate excess conservatism, a seam and joint testing program was implemented as part of the structural validation. This method split each of the parachute structural joints into discrete tensile tests designed to duplicate the loading of each joint. Breaking strength data collected from destructive pull testing was then used to calculate the joint factor in the form of an efficiency. Joint efficiency is the percentage of the base material strength that remains after degradation due to sewing or interaction with other components; it is used interchangeably with joint factor in this paper. Parachute materials vary in type-mainly cord, tape, webbing, and cloth -which require different test fixtures and joint sample construction methods. This paper defines guidelines for designing and testing samples based on materials and test goals. Using the test methodology and analysis approach detailed in this paper, the minimum joint factor for each parachute component can be formulated. The joint factors can then be used to calculate the design factor and margin of safety for that component, a critical part of the design verification process.

  12. Parachuting behavior and predation by ants in the nettle caterpillar, Scopelodes contracta.

    Science.gov (United States)

    Yamazaki, Kazuo

    2010-01-01

    This paper documents the bizarre descending behavior from the tree crown to the ground of the larvae of the moth, Scopelodes contracta Walker (Lepidoptera: Limacodidae) and the interaction of the larva with predatory ants. S. contracta larvae infest leaves of many tree species in urban areas and orchards in Japan. Mature larvae and leaves without basal leaf parts were found under trees of four species infested with S. contracta larvae in Osaka, Japan. Individual larvae riding on leaves were observed falling from tree crowns to the ground. Many S. contracta cocoons were found in the soil below the trees two weeks after the observed parachuting. These observations indicate that S. contracta larvae parachuted to the ground where they spin their cocoons in the soil. When a larva that had just parachuted down was returned to an arboreal twig, the larva repeated the parachuting behavior. This parachuting behavior appears to be adaptive, because larvae can descend to the ground safely and with low energy cost. Worker ants of Tetramorium tsushimae Emery (Hymenoptera: Formicidae) and Pristomyrmex punctatus Mayr (Hymenoptera: Formicidae) occasionally attacked larvae on the ground before they had a chance to burrow in the soil.

  13. A Survey of Parachute Ankle Brace Breakages

    National Research Council Canada - National Science Library

    Knapik, Joseph J; Spiess, Anita; Darakjy, Salima; Grier, Tyson; Manning, Fred; Livingston, Elaine; Swedler, David; Amoroso, Paul; Jones, Bruce H

    2008-01-01

    ...) of the Defense Safety Oversight Council (DSOC) to evaluate the parachute ankle brace (PAB). Information provided by the questionnaire identified potential injury risk factors and comments on the PAB...

  14. Effect of Parachute Jump in the Psychophysiological Response of Soldiers in Urban Combat.

    Science.gov (United States)

    Sánchez-Molina, Joaquín; Robles-Pérez, José J; Clemente-Suárez, Vicente J

    2017-06-01

    The study of organic and psychological response during combat situations has been poorly reported despite its importance for soldiers training and specific instruction, so it was proposed as aim of the present investigation to analyze the effect of a tactical parachute simulated jump in psycho-physiological response of paratroopers' warfighters during an urban combat simulation. 19 male paratroopers (31.9 ± 6.2 year old; 173.6 ± 5.3 cm; 73.8 ± 8.3 Kg) of the Spanish Army were divided in two groups: parachute jump group (n:11) that conducted a simulated parachute jump and a urban combat maneuver and a non-parachute jump group (n:8) that only conducted an urban combat maneuver. We analyzed before and after the maneuver the rated perceived exertion, legs strength manifestation, blood lactate, cortical activation, heart rate variability, blood oxygen saturation and pressure, skin temperature, fine motor skills, and anxiety state. A tactical parachute simulated jump prior to an urban combat maneuver produce significantly (p jump situation in professional Army paratroopers. Independently of the parachute jump, an urban combat maneuver produces a significant increase in rated perceived exertion, blood lactate, heart rate, legs strength, sympathetic modulation and anxiety response as well as a significant decrease in blood oxygen saturation and parasympathetic modulation.

  15. Prolactin, thyrotropin, and growth hormone release during stress associated with parachute jumping.

    Science.gov (United States)

    Noel, G L; Dimond, R C; Earll, J M; Frantz, A G

    1976-05-01

    Prolactin, growth hormone, and thyrotropin (TSH) release during the stress of parachute jumping has been evaluated in 14 male subjects. Subjects were studied at several times before and immediately after their first military parachute jump. All three hormones had risen significantly 1 to 14 min after the jump, compared to mean levels measured immediately beforehand. Earlier studies of physical exercise by ourselves and others would suggest that emotional stress played a role in producing changes of this magnitude. We conclude that prolactin, TSH, and growth hormone are released in physiologically significant amounts in association with the stress of parachute jumping.

  16. Parachute-Payload System Flight Dynamics and Trajectory Simulation

    Directory of Open Access Journals (Sweden)

    Giorgio Guglieri

    2012-01-01

    Full Text Available The work traces a general procedure for the design of a flight simulation tool still representative of the major flight physics of a parachute-payload system along decelerated trajectories. An example of limited complexity simulation models for a payload decelerated by one or more parachutes is given, including details and implementation features usually omitted as the focus of the research in this field is typically on the investigation of mission design issues, rather than addressing general implementation guidelines for the development of a reconfigurable simulation tool. The dynamics of the system are modeled through a simple multibody model that represents the expected behavior of an entry vehicle during the terminal deceleration phase. The simulators are designed according to a comprehensive vision that enforces the simplification of the coupling mechanism between the payload and the parachute, with an adequate level of physical insight still available. The results presented for a realistic case study define the sensitivity of the simulation outputs to the functional complexity of the mathematical model. Far from being an absolute address for the software designer, this paper tries to contribute to the area of interest with some technical considerations and clarifications.

  17. Mechanically-Deployed Hypersonic Decelerator and Conformal Ablator Technologies for Mars Missions

    Science.gov (United States)

    Venkatapathy, Ethiraj; Wercinski, Paul F.; Beck, Robin A. S.; Hamm, Kenneth R.; Yount, Bryan C.; Makino, A.; Smith, B.; Gage, P.; Prabhu, D.

    2012-01-01

    The concept of a mechanically deployable hypersonic decelerator, developed initially for high mass (40 MT) human Mars missions, is currently funded by OCT for technology maturation. The ADEPT (Adaptive, Deployable Entry and Placement Technology) project has broad, game-changing applicability to in situ science missions to Venus, Mars, and the Outer Planets. Combined with maturation of conformal ablator technology (another current OCT investment), the two technologies provide unique low mass mission enabling capabilities otherwise not achievable by current rigid aeroshell or by inflatables. If this abstract is accepted, we will present results that illustrate the mission enabling capabilities of the mechanically deployable architecture for: (1) robotic Mars (Discovery or New Frontiers class) in the near term; (2) alternate approaches to landing MSL-class payloads, without the need for supersonic parachute or lifting entry, in the mid-term; and (3) Heavy mass and human missions to Mars in the long term.

  18. Dynamic Mesh CFD Simulations of Orion Parachute Pendulum Motion During Atmospheric Entry

    Science.gov (United States)

    Halstrom, Logan D.; Schwing, Alan M.; Robinson, Stephen K.

    2016-01-01

    This paper demonstrates the usage of computational fluid dynamics to study the effects of pendulum motion dynamics of the NASAs Orion Multi-Purpose Crew Vehicle parachute system on the stability of the vehicles atmospheric entry and decent. Significant computational fluid dynamics testing has already been performed at NASAs Johnson Space Center, but this study sought to investigate the effect of bulk motion of the parachute, such as pitching, on the induced aerodynamic forces. Simulations were performed with a moving grid geometry oscillating according to the parameters observed in flight tests. As with the previous simulations, OVERFLOW computational fluid dynamics tool is used with the assumption of rigid, non-permeable geometry. Comparison to parachute wind tunnel tests is included for a preliminary validation of the dynamic mesh model. Results show qualitative differences in the flow fields of the static and dynamic simulations and quantitative differences in the induced aerodynamic forces, suggesting that dynamic mesh modeling of the parachute pendulum motion may uncover additional dynamic effects.

  19. Reconstruction of Orion Engineering Development Unit (EDU) Parachute Inflation Loads

    Science.gov (United States)

    Ray, Eric S.

    2013-01-01

    The process of reconstructing inflation loads of Capsule Parachute Assembly System (CPAS) has been updated as the program transitioned to testing Engineering Development Unit (EDU) hardware. The equations used to reduce the test data have been re-derived based on the same physical assumptions made by simulations. Due to instrumentation challenges, individual parachute loads are determined from complementary accelerometer and load cell measurements. Cluster inflations are now simulated by modeling each parachute individually to better represent different inflation times and non-synchronous disreefing. The reconstruction procedure is tailored to either infinite mass or finite mass events based on measurable characteristics from the test data. Inflation parameters are determined from an automated optimization routine to reduce subjectivity. Infinite mass inflation parameters have been re-defined to avoid unrealistic interactions in Monte Carlo simulations. Sample cases demonstrate how best-fit inflation parameters are used to generate simulated drag areas and loads which favorably agree with test data.

  20. Parachuting plasmapheresis into the Ebola crisis | Zacharias | Africa ...

    African Journals Online (AJOL)

    Parachuting plasmapheresis into the Ebola crisis. ... A vehicle was pre-fitted with sophisticated equipment and airlifted to the study site (ELWA). ... Training included plasmapheresis, donor management, testing and pathogen inactivation.

  1. Computational fluid dynamic (CFD) analysis on ALUDRA SR-10 UAV with parachute recovery system

    Science.gov (United States)

    Saim, R.; Mohd, S.; Shamsudin, S. S.; Zulkifli, M. F.; Omar, Z.; Subari@Rahmat, Z.; Masrom, M. F. Mohd; Zaki, Y.

    2017-09-01

    In an operation, belly landing is mostly applied as recovery method especially on research Unmanned Aerial Vehicle (UAV) such as Aludra SR-10. This type of landing method may encounter tough landing on hard soil and gravel which create high impact load on the aircraft. The impact may cause structural or system damage which costly to be repaired. Nowadays, Parachute Recovery System (PRS) recently used in numerous different tasks such as landing purpose to replace belly landing technique. Parachute use in this system to slow down flying or falling UAV to a safe landing by opening the canopy to increase aerodynamic drag. This paper was described the Computational Fluid Dynamic (CFD) analysis on ALUDRA SR-10 model with two different conditions i.e. the UAV equipped with and without parachute in order to identify the changes of aerodynamic characteristics. This simulation studies using solid models of aircraft and hemisphere parachute and was carried out by using ANSYS 16.0 Fluent under steady and turbulent flow and was modelled using the k-epsilon (k-ε) turbulence model. This simulation was limited to determine the drag force and drag coefficient. The obtained result showed that implementation of parachute increase 0.25 drag coefficient of the aircraft that is from 0.93 to 1.18. Subsequent to the reduction of descent rate caused by the parachute, the drag force of the aircraft increase by 0.76N. These increasing of drag force of the aircraft will produce lower terminal velocity which is expected to reduce the impact force on the aircraft during landing.

  2. Pilot ejection, parachute, and helicopter crash injuries.

    Science.gov (United States)

    McBratney, Colleen M; Rush, Stephen; Kharod, Chetan U

    2014-01-01

    USAF Pararescuemen (PJs) respond to downed aircrew as a fundamental mission for personnel recovery (PR), one of the Air Force's core functions. In addition to responding to these in Military settings, the PJs from the 212 Rescue Squadron routinely respond to small plane crashes in remote regions of Alaska. While there is a paucity of information on the latter, there have been articles detailing injuries sustained from helicopter crashes and while ejecting or parachuting from fixed wing aircraft. The following represents a new chapter added to the Pararescue Medical Operations Handbook, Sixth Edition (2014, editors Matt Wolf, MD, and Stephen Rush, MD, in press). It was designed to be a quick reference for PJs and their Special Operations flight surgeons to help with understanding of mechanism of injury with regard to pilot ejection, parachute, and helicopter accident injuries. It outlines the nature of the injuries sustained in such mishaps and provides an epidemiologic framework from which to approach the problem. 2014.

  3. Validation of Multibody Program to Optimize Simulated Trajectories II Parachute Simulation with Interacting Forces

    Science.gov (United States)

    Raiszadeh, Behzad; Queen, Eric M.; Hotchko, Nathaniel J.

    2009-01-01

    A capability to simulate trajectories of multiple interacting rigid bodies has been developed, tested and validated. This capability uses the Program to Optimize Simulated Trajectories II (POST 2). The standard version of POST 2 allows trajectory simulation of multiple bodies without force interaction. In the current implementation, the force interaction between the parachute and the suspended bodies has been modeled using flexible lines, allowing accurate trajectory simulation of the individual bodies in flight. The POST 2 multibody capability is intended to be general purpose and applicable to any parachute entry trajectory simulation. This research paper explains the motivation for multibody parachute simulation, discusses implementation methods, and presents validation of this capability.

  4. Improved control system power unit for large parachutes

    Science.gov (United States)

    Chandler, J. A.; Grubbs, T. M.

    1968-01-01

    Improved control system power unit drives the control surfaces of very large controllable parachutes. The design features subassemblies for determining control surface position and cable loading, and protection of the load sensor against the possibility of damage during manipulation.

  5. Parachute diverts ventilation fast

    Energy Technology Data Exchange (ETDEWEB)

    Chironis, N.P.

    1990-02-01

    The USBM Pittsburgh Research Center is developing a simple, inexpensive and highly effective new technique for keeping smoke and toxic gases out of intake escapeways during mine fires. The technique involves the use of a special parachute which fixes onto a roof bolt plate or strap, and is automatically inflated by incoming air. The chute thus becomes a quick-erect check curtain which leaks much less than conventional curtains. The air pressure in the intake quickly climbs, making it unlikely that any smoke from an adjacent entry would be able to migrate into the intake. 2 figs.

  6. Ribbon and gliding type parachutes evaluated in the 7 by 10 foot transonic wind tunnel

    Energy Technology Data Exchange (ETDEWEB)

    Ottensoser, J.

    1975-09-01

    An experiment has been conducted in the NSRDC 7- x 10-foot transonic tunnel for the Sandia Corporation to evaluate various parachute parameters. The experiment consisted of three main parts: the first phase evaluated the disreefing characteristics of the various parachutes as well as the drag forces before, during, and after disreefing; the second phase measured the pressure distribution around the chute as well as the drag forces; and the final phase evaluated the disreefing and drag characteristics of gliding type parachutes. The free stream dynamic pressure varied from 65 to 500 psf. 12 figures, 1 table. (auth)

  7. Percutaneous Implantation of A Parachute Device For Treatment of Ischemic Heart Failure

    Energy Technology Data Exchange (ETDEWEB)

    Cilingiroglu, Mehmet, E-mail: mcilingiroglu@yahoo.com; Rollefson, William A.; Mego, David

    2013-07-15

    Congestive heart failure (CHF) secondary to ischemic cardiomyopathy is associated with significant morbidity and mortality despite currently available medical therapy. The Parachute{sup TM} device is a novel left ventricular partitioning device that is delivered percutaneously in the left ventricle (LV) in patients with anteroapical regional wall motion abnormalities, dilated LV and systolic dysfunction after anterior myocardial infarction with favorable clinical and LV hemodynamic improvements post-implantation. Here, we do review the current literature and present a case of the Parachute device implantation.

  8. Percutaneous Implantation of A Parachute Device For Treatment of Ischemic Heart Failure

    International Nuclear Information System (INIS)

    Cilingiroglu, Mehmet; Rollefson, William A.; Mego, David

    2013-01-01

    Congestive heart failure (CHF) secondary to ischemic cardiomyopathy is associated with significant morbidity and mortality despite currently available medical therapy. The Parachute TM device is a novel left ventricular partitioning device that is delivered percutaneously in the left ventricle (LV) in patients with anteroapical regional wall motion abnormalities, dilated LV and systolic dysfunction after anterior myocardial infarction with favorable clinical and LV hemodynamic improvements post-implantation. Here, we do review the current literature and present a case of the Parachute device implantation

  9. Parachute technique for partial penectomy

    Directory of Open Access Journals (Sweden)

    Fernando Korkes

    2010-04-01

    Full Text Available PURPOSE: Penile carcinoma is a rare but mutilating malignancy. In this context, partial penectomy is the most commonly applied approach for best oncological results. We herein propose a simple modification of the classic technique of partial penectomy, for better cosmetic and functional results. TECHNIQUE: If partial penectomy is indicated, the present technique can bring additional benefits. Different from classical technique, the urethra is spatulated only ventrally. An inverted "V" skin flap with 0.5 cm of extension is sectioned ventrally. The suture is performed with vicryl 4-0 in a "parachute" fashion, beginning from the ventral portion of the urethra and the "V" flap, followed by the "V" flap angles and than by the dorsal portion of the penis. After completion of the suture, a Foley catheter and light dressing are placed for 24 hours. CONCLUSIONS: Several complex reconstructive techniques have been previously proposed, but normally require specific surgical abilities, adequate patient selection and staged procedures. We believe that these reconstructive techniques are very useful in some specific subsets of patients. However, the technique herein proposed is a simple alternative that can be applied to all men after a partial penectomy, and takes the same amount of time as that in the classic technique. In conclusion, the "parachute" technique for penile reconstruction after partial amputation not only improves the appearance of the penis, but also maintains an adequate function.

  10. Innovations in Air Insertion (Involving Parachutes)

    Science.gov (United States)

    2008-03-01

    loadings and different trim. .........48 Figure 16. Thermal being radiated from a ploughed field.50 Figure 17. A series of ridges can amplify a wave and...Crews," MHQ: The Quarterly Journal of Military History 10, no. Autumn 1998 (1998), 99. 5 Niedermeyer was killed in March of 1922 did parachutes...was killed on a 1998 wing suit jump, the cause was not wing suit related but rather the result of an easily preventable rigging

  11. Packing and deploying Soft Origami to and from cylindrical volumes with application to automotive airbags.

    Science.gov (United States)

    Bruton, Jared T; Nelson, Todd G; Zimmerman, Trent K; Fernelius, Janette D; Magleby, Spencer P; Howell, Larry L

    2016-09-01

    Packing soft-sheet materials of approximately zero bending stiffness using Soft Origami (origami patterns applied to soft-sheet materials) into cylindrical volumes and their deployment via mechanisms or internal pressure (inflation) is of interest in fields including automobile airbags, deployable heart stents, inflatable space habitats, and dirigible and parachute packing. This paper explores twofold patterns, the 'flasher' and the 'inverted-cone fold', for packing soft-sheet materials into cylindrical volumes. Two initial packing methods and mechanisms are examined for each of the flasher and inverted-cone fold patterns. An application to driver's side automobile airbags is performed, and deployment tests are completed to compare the influence of packing method and origami pattern on deployment performance. Following deployment tests, two additional packing methods for the inverted-cone fold pattern are explored and applied to automobile airbags. It is shown that modifying the packing method (using different methods to impose the same base pattern on the soft-sheet material) can lead to different deployment performance. In total, two origami patterns and six packing methods are examined, and the benefits of using Soft Origami patterns and packing methods are discussed. Soft Origami is presented as a viable method for efficiently packing soft-sheet materials into cylindrical volumes.

  12. Asymptotic Parachute Performance Sensitivity

    Science.gov (United States)

    Way, David W.; Powell, Richard W.; Chen, Allen; Steltzner, Adam D.

    2006-01-01

    In 2010, the Mars Science Laboratory mission will pioneer the next generation of robotic Entry, Descent, and Landing systems by delivering the largest and most capable rover to date to the surface of Mars. In addition to landing more mass than any other mission to Mars, Mars Science Laboratory will also provide scientists with unprecedented access to regions of Mars that have been previously unreachable. By providing an Entry, Descent, and Landing system capable of landing at altitudes as high as 2 km above the reference gravitational equipotential surface, or areoid, as defined by the Mars Orbiting Laser Altimeter program, Mars Science Laboratory will demonstrate sufficient performance to land on 83% of the planet s surface. By contrast, the highest altitude landing to date on Mars has been the Mars Exploration Rover at 1.3 km below the areoid. The coupling of this improved altitude performance with latitude limits as large as 60 degrees off of the equator and a precise delivery to within 10 km of a surface target, will allow the science community to select the Mars Science Laboratory landing site from thousands of scientifically interesting possibilities. In meeting these requirements, Mars Science Laboratory is extending the limits of the Entry, Descent, and Landing technologies qualified by the Mars Viking, Mars Pathfinder, and Mars Exploration Rover missions. Specifically, the drag deceleration provided by a Viking-heritage 16.15 m supersonic Disk-Gap-Band parachute in the thin atmosphere of Mars is insufficient, at the altitudes and ballistic coefficients under consideration by the Mars Science Laboratory project, to maintain necessary altitude performance and timeline margin. This paper defines and discusses the asymptotic parachute performance observed in Monte Carlo simulation and performance analysis and its effect on the Mars Science Laboratory Entry, Descent, and Landing architecture.

  13. Verification and Validation of the Spring Model Parachute Air Delivery System in Subsonic Flow

    Science.gov (United States)

    2015-02-27

    permeability [5]. Thus the coupling of the vertical flow with the permeable and flexible fabric may have significant difference with rigid bluff bodies...Vorticity, from left to right: γ = 0, 0.25, 0.5, 0.75 of the canopies and risers . Among these parachutes, the T-10 parachute is used by the Army as a...G. F. Homicz, and A. A. Gossler, Fluid- structure coupling for lightweight flexible bodies, 17th AIAA Aerodynamic Decelerator Systems Technology

  14. Structures and Mechanisms Design Concepts for Adaptive Deployable Entry Placement Technology

    Science.gov (United States)

    Yount, Bryan C.; Arnold, James O.; Gage, Peter J.; Mockelman, Jeffrey; Venkatapathy, Ethiraj

    2012-01-01

    System studies have shown that large deployable aerodynamic decelerators such as the Adaptive Deployable Entry and Placement Technology (ADEPT) concept can revolutionize future robotic and human exploration missions involving atmospheric entry, descent and landing by significantly reducing the maximum heating rate, total heat load, and deceleration loads experienced by the spacecraft during entry [1-3]. ADEPT and the Hypersonic Inflatable Aerodynamic Decelerator (HIAD) [4] share the approach of stowing the entry system in the shroud of the launch vehicle and deploying it to a much larger diameter prior to entry. The ADEPT concept provides a low ballistic coefficient for planetary entry by employing an umbrella-like deployable structure consisting of ribs, struts and a fabric cover that form an aerodynamic decelerator capable of undergoing hypersonic flight. The ADEPT "skin" is a 3-D woven carbon cloth that serves as a thermal protection system (TPS) and as a structural surface that transfers aerodynamic forces to the underlying ribs [5]. This paper focuses on design activities associated with integrating ADEPT components (cloth, ribs, struts and mechanisms) into a system that can function across all configurations and environments of a typical mission concept: stowed during launch, in-space deployment, entry, descent, parachute deployment and separation from the landing payload. The baseline structures and mechanisms were selected via trade studies conducted during the summer and fall of 2012. They are now being incorporated into the design of a ground test article (GTA) that will be fabricated in 2013. It will be used to evaluate retention of the stowed configuration in a launch environment, mechanism operation for release, deployment and locking, and static strength of the deployed decelerator. Of particular interest are the carbon cloth interfaces, underlying hot structure, (Advanced Carbon- Carbon ribs) and other structural components (nose cap, struts, and

  15. The parachute morphology as equilibrium morphology of vesicle-polymer hybrids?

    NARCIS (Netherlands)

    Jung, M.; Hubert, D.H.W.; Herk, van A.M.; German, A.L.

    2000-01-01

    Polymerisation in vesicles leads to novel polymer colloid morphologies. Two morphologies are currently reported: the triple-shell and the parachute morphology. The termodynamic analysis of these two morphologies, presented here, stresses the importance of considering interfacial energies between

  16. 32 CFR 705.32 - Aviation events and parachute demonstrations.

    Science.gov (United States)

    2010-07-01

    ... performing. What type of crowd control is planned? 5. Flight and Parachute Team demonstrations require that... the public domain is to support the recruiting aspects of the all-volunteer force concept. The... member of the public might wish to have clarified, contact Chief, Aerial Events Branch, OASD(PA), Room...

  17. The influence of parachute-resisted sprinting on running mechanics in collegiate track athletes.

    Science.gov (United States)

    Paulson, Sally; Braun, William A

    2011-06-01

    The influence of parachute-resisted sprinting on running mechanics in collegiate track athletes. The aim of this investigation was to compare the acute effects of parachute-resisted (PR) sprinting on selected kinematic variables. Twelve collegiate sprinters (mean age 19.58 ± 1.44 years, mass 69.32 ± 14.38 kg, height 1.71 ± 9.86 m) ran a 40-yd dash under 2 conditions: PR sprint and sprint without a parachute (NC) that were recorded on a video computer system (60 Hz). Sagittal plane kinematics of the right side of the body was digitized to calculate joint angles at initial ground contact (IGC) and end ground contact (EGC), ground contact (GC) time, stride rate (SR), stride length (SL), and the times of the 40-yd dashes. The NC 40-yd dash time was significantly faster than the PR trial (p 0.05). This study suggests that PR sprinting does not acutely affect GC time, SR, SL and upper extremity or lower extremity joint angles during weight acceptance (IGC) in collegiate sprinters. However, PR sprinting increased shoulder flexion by 23.5% at push-off and decreased speed by 4.4%. While sprinting with the parachute, the athlete's movement patterns resembled their mechanics during the unloaded condition. This indicates the external load caused by PR did not substantially overload the runner, and only caused a minor change in the shoulder during push-off. This sports-specific training apparatus may provide coaches with another method for training athletes in a sports-specific manner without causing acute changes to running mechanics.

  18. Simulation of 3D parachute fluid–structure interaction based on nonlinear finite element method and preconditioning finite volume method

    Directory of Open Access Journals (Sweden)

    Fan Yuxin

    2014-12-01

    Full Text Available A fluid–structure interaction method combining a nonlinear finite element algorithm with a preconditioning finite volume method is proposed in this paper to simulate parachute transient dynamics. This method uses a three-dimensional membrane–cable fabric model to represent a parachute system at a highly folded configuration. The large shape change during parachute inflation is computed by the nonlinear Newton–Raphson iteration and the linear system equation is solved by the generalized minimal residual (GMRES method. A membrane wrinkling algorithm is also utilized to evaluate the special uniaxial tension state of membrane elements on the parachute canopy. In order to avoid large time expenses during structural nonlinear iteration, the implicit Hilber–Hughes–Taylor (HHT time integration method is employed. For the fluid dynamic simulations, the Roe and HLLC (Harten–Lax–van Leer contact scheme has been modified and extended to compute flow problems at all speeds. The lower–upper symmetric Gauss–Seidel (LU-SGS approximate factorization is applied to accelerate the numerical convergence speed. Finally, the test model of a highly folded C-9 parachute is simulated at a prescribed speed and the results show similar characteristics compared with experimental results and previous literature.

  19. An Innovative High Fidelity Multidisciplinary Computational Framework for Parachute Inflation Dynamics

    Data.gov (United States)

    National Aeronautics and Space Administration — Current technology for decelerating a spacecraft from the high speed of atmospheric entry to the final stages of landing on Mars is based on parachute systems. It...

  20. Sub-Scale Orion Parachute Test Results from the National Full-Scale Aerodynamics Complex 80- By 120-ft Wind Tunnel

    Science.gov (United States)

    Anderson, Brian P.; Greathouse, James S.; Powell, Jessica M.; Ross, James C.; Schairer, Edward T.; Kushner, Laura; Porter, Barry J.; Goulding, Patrick W., II; Zwicker, Matthew L.; Mollmann, Catherine

    2017-01-01

    A two-week test campaign was conducted in the National Full-Scale Aerodynamics Complex 80 x 120-ft Wind Tunnel in support of Orion parachute pendulum mitigation activities. The test gathered static aerodynamic data using an instrumented, 3-tether system attached to the parachute vent in combination with an instrumented parachute riser. Dynamic data was also gathered by releasing the tether system and measuring canopy performance using photogrammetry. Several canopy configurations were tested and compared against the current Orion parachute design to understand changes in drag performance and aerodynamic stability. These configurations included canopies with varying levels and locations of geometric porosity as well as sails with increased levels of fullness. In total, 37 runs were completed for a total of 392 data points. Immediately after the end of the testing campaign a down-select decision was made based on preliminary data to support follow-on sub-scale air drop testing. A summary of a more rigorous analysis of the test data is also presented.

  1. Airborne Priapism: A Case of Nonischemic Priapism After Military Static-Line Parachute Injury.

    Science.gov (United States)

    Charny, Grigory; Booms, Zachary; McDonough, Patrick; Schauer, Steven

    2015-07-01

    We report the case of a 21-year-old active duty U.S. Army soldier with painful and nonresolving priapism following blunt pelvic and lower extremity trauma from military static-line parachute injury during training. The patient's condition was initially managed with corporal aspiration and intracavernosal injections of phenylephrine that provided temporary relief but recurrence soon after. Referral to Urology at the site of the patient's injury yielded a diagnosis of penile hematoma. On subsequent evaluation by Urology on return to the patient's home duty station (over 96 hours after injury, with symptoms persisting), the corpora cavernosa were rigid, the corpus spongiosum was soft, and corporal blood gas drawn by the emergency department consistent with arterial blood. Penile duplex ultrasound revealed an isolated arterial-cavernosal fistula within the proximal left corporal body. The patient underwent percutaneous embolization of the fistula with successful resolution of his condition and return of normal erectile function. We discuss this unique case of high-flow priapism occurring after blunt trauma from military parachute injury and review suggested management in a stepwise fashion. The case is significant in that extensive literature review yields no previously described case of priapism following trauma from military parachute injury. Reprint & Copyright © 2015 Association of Military Surgeons of the U.S.

  2. PROCESSING AND ANALYSIS OF Fligh experiment DATA FOR DETERMINING THE CHARACTERISTICS OF THE MOTION OF A ROUND PARACHUTE on a spiral trajectory AT HIGH ALTITUDES

    Directory of Open Access Journals (Sweden)

    S. V. Zhurin

    2015-01-01

    Full Text Available The article is addressed to the analysis of the trajectory parameters and videos obtained during the flight experiment at the launch of meteo-rocket MMP-06 with the purpose to determine major parameters of motion of a round parachute at subsonic speeds in the range of altitudes from 0 to 40 km. The data analysis showed that the trajectory of the parachute represents spiral "stretched" by the wind in the horizontal direction and disturbed by random factors of a non-stationary flow around the parachute. The main parameters of the trajectory are obtained according to the experimental data. Only qualitative analysis of spiral motion paths for round parachutes may be found in the publications on parachute subjects. This article presents the quantitative characteristics of this process.

  3. PROCESSING AND ANALYSIS OF DATA OF natural experiment FOR DETERMINING THE tragectory CHARACTERISTICS OF A ROUND PARACHUTE AT HIGH ALTITUDES

    Directory of Open Access Journals (Sweden)

    S. V. Zhurin

    2015-01-01

    Full Text Available The article is devoted to the analysis of the trajectory parameters obtained during the flight experiment at the start of meteo-rocket MMP-06, to determine major parameters of motion of a round parachute at subsonic speeds in the range of altitudes from 0 to 60 km. The Reynolds number is changed in the range from 104 to1,5·106.The main parameters of the trajectory were obtained according to the experimental data. Only laboratory research on a model parachute systems in such a wide range of Reynolds numbers are found in the literature on parachute subjects. This article obtained results of flight experiment.

  4. SUSI 62 A ROBUST AND SAFE PARACHUTE UAV WITH LONG FLIGHT TIME AND GOOD PAYLOAD

    Directory of Open Access Journals (Sweden)

    H. P. Thamm

    2012-09-01

    Full Text Available In many research areas in the geo-sciences (erosion, land use, land cover change, etc. or applications (e.g. forest management, mining, land management etc. there is a demand for remote sensing images of a very high spatial and temporal resolution. Due to the high costs of classic aerial photo campaigns, the use of a UAV is a promising option for obtaining the desired remote sensed information at the time it is needed. However, the UAV must be easy to operate, safe, robust and should have a high payload and long flight time. For that purpose, the parachute UAV SUSI 62 was developed. It consists of a steel frame with a powerful 62 cm3 2- stroke engine and a parachute wing. The frame can be easily disassembled for transportation or to replace parts. On the frame there is a gimbal mounted sensor carrier where different sensors, standard SLR cameras and/or multi-spectral and thermal sensors can be mounted. Due to the design of the parachute, the SUSI 62 is very easy to control. Two different parachute sizes are available for different wind speed conditions. The SUSI 62 has a payload of up to 8 kg providing options to use different sensors at the same time or to extend flight duration. The SUSI 62 needs a runway of between 10 m and 50 m, depending on the wind conditions. The maximum flight speed is approximately 50 km/h. It can be operated in a wind speed of up to 6 m/s. The design of the system utilising a parachute UAV makes it comparatively safe as a failure of the electronics or the remote control only results in the UAV coming to the ground at a slow speed. The video signal from the camera, the GPS coordinates and other flight parameters are transmitted to the ground station in real time. An autopilot is available, which guarantees that the area of investigation is covered at the desired resolution and overlap. The robustly designed SUSI 62 has been used successfully in Europe, Africa and Australia for scientific projects and also for

  5. Factors Affecting Planting Depth and Standing of Rice Seedling in Parachute Rice Transplanting

    Science.gov (United States)

    Astika, I. W.; Subrata, I. D. M.; Pramuhadi, G.

    2018-05-01

    Parachute rice transplanting is a simple and practical rice transplanting method. It can be done manually or mechanically, with various possible designs of machines or tools. This research aimed at quantitatively formulating related factors to the planting depth and standing of rice seedling. Parachute seedlings of rice were grown at several sizes of parachute soil bulb sizes. The trays were specially designed with a 3D printer having bulb sizes 7, 8, 9, 10 mm in square sides and 15 mm depth. At seedling ages of 8-12 days after sowing the seedling bulbs were drops into puddled soil. Soil hardness was set at 3 levels of hardness, measured in hardness index using golf ball test. Angle of dropping was set at 3 levels: 0°, 30°and 45° from the vertical axis. The height of droppings was set at 100 cm, 75 cm, and 50 cm. The relationship between bulb size, height of dropping, soil hardness, dropping angle and planting depth was formulated with ANN. Most of input variables did not significantly affect the planting depth, except that hard soil significantly differs from mild soil and soft soil. The dropping also resulted in various positions of the planted seedlings: vertical standing, sloped, and falling. However, at any position of the planted seedlings, the seedlings would recover themselves into normally vertical position. With this result, the design of planting machinery, as well as the manual planting operation, can be made easier.

  6. Extrapolating the Trends of Test Drop Data with Opening Shock Factor Calculations: the Case of the Orion Main and Drogue Parachutes Inflating to 1st Reefed Stage

    Science.gov (United States)

    Potvin, Jean; Ray, Eric

    2017-01-01

    We describe a new calculation of the opening shock factor C (sub k) characterizing the inflation performance of NASA's Orion spacecraft main and drogue parachutes opening under a reefing constraint (1st stage reefing), as currently tested in the Capsule Parachute Assembly System (CPAS) program. This calculation is based on an application of the Momentum-Impulse Theorem at low mass ratio (R (sub m) is less than 10 (sup -1)) and on an earlier analysis of the opening performance of drogues decelerating point masses and inflating along horizontal trajectories. Herein we extend the reach of the Theorem to include the effects of payload drag and gravitational impulse during near-vertical motion - both important pre-requisites for CPAS parachute analysis. The result is a family of C (sub k) versus R (sub m) curves which can be used for extrapolating beyond the drop-tested envelope. The paper proves this claim in the case of the CPAS Mains and Drogues opening while trailing either a Parachute Compartment Drop Test Vehicle or a Parachute Test Vehicle (an Orion capsule boiler plate). It is seen that in all cases the values of the opening shock factor can be extrapolated over a range in mass ratio that is at least twice that of the test drop data.

  7. Wind tunnel tests of modified cross, hemisflo, and disk-gap-band parachutes with emphasis in the transonic range

    Science.gov (United States)

    Foughner, J. T., Jr.; Alexander, W. C.

    1974-01-01

    Transonic wind-tunnel studies were conducted with modified cross, hemisflo, and disk-gap-band parachute models in the wake of a cone-cylinder shape forebody. The basic cross design was modified with the addition of a circumferential constraining band at the lower edge of the canopy panels. The tests covered a Mach number range of 0.3 to 1.2 and a dynamic pressure range from 479 Newtons per square meter to 5746 Newtons per square meter. The parachute models were flexible textile-type structures and were tethered to a rigid forebody with a single flexible riser. Different size models of the modified cross and disk-gap-band canopies were tested to evaluate scale effects. Model reference diameters were 0.30, 0.61, and 1.07 meters (1.0, 2.0, and 3.5 ft) for the modified cross; and nominal diameters of 0.25 and 0.52 meter (0.83 and 1.7 ft) for the disk-gap-band; and 0.55 meter (1.8 ft) for the hemisflo. Reefing information is presented for the 0.61-meter-diameter cross and the 0.52-meter-diameter disk-gap-band. Results are presented in the form of the variation of steady-state average drag coefficient with Mach number. General stability characteristics of each parachute are discussed. Included are comments on canopy coning, spinning, and fluttering motions.

  8. Go-Scufy: Redesain Produk Sepatu Wanita Berbahan Karung Goni Menggunakan Metode Quality Function Deployment

    Directory of Open Access Journals (Sweden)

    Catur Endah Sulistiyoningrum

    2017-07-01

    Full Text Available Creative industry is a cycle of creation, production, and distribution of goods / services using creativity and intellectual capital as the main input. The creative industry can improve the welfare and create new jobs for the community. The object of this research is a shoe manufacturer. In general, shoes made using synthetic raw materials so that shoes products tend not environmentally friendly. Many alternative natural materials are more environmentally friendly to replace this synthetic product, one of which is a burlap sack. This research is doing redesign of women's shoe sack with Quality Function Deployment method. The results of the house of quality matrix are design targets including: good quality and durable materials, shoe prices, concept of sneaker shoe, external sole material and insole, combination of dark and bright colors, batik inner/outer appearance is different, display design can be replaced, shoe fin section can be removed pairs, the main material of burlap sack, there is a waterproof parachute; and multifunctional shoes.

  9. Parachuting and pregnancy: what do we know about pregnant skydivers and the risks they are taking?

    Science.gov (United States)

    Ebner, Florian; Wöckel, Achim; Janni, Wolfgang; Paterson, Helen

    2014-11-01

    There is little medical knowledge about the risks of skydiving during pregnancy. Some national parachuting associations ask for a doctor's permission; others recommend not jumping at all during pregnancy. This article provides survey data and a literature review of pregnancy and parachuting/skydiving related issues to help the pregnant skydiver and her obstetrician make an informed decision. Survey data presented include pregnancy, delivery, and parachuting information from skydivers who jumped during pregnancy. International retrospective anonymous online questionnaire considering the Checklist for Reporting Results of Internet E-Surveys (CHERRIE). The PubMed database was searched with using the terms "skydive," "pregnancy," and "parachute" (query April 2013). Web page questionnaire on skydivers' epidemiology, experience, and pregnancy-related information. Fifty-seven parous female skydivers. Information on athletes' experience, weather conditions, obstetric history (gravida, gestational week), delivery mode was obtained. Epidemiology of pregnant skydivers and literature review to provide information on skydiving risks. Women do actively decide to skydive while pregnant. The majority of our participants were between 25-year-old and 35-year-old primips with 100 to 1000 jumps experience, answering the questionnaire from a European IP address. Precautions are taken in terms of weather conditions, gear, or sports partner. The literature review found no relevant literature regarding the question. Literature is searched for risk factors that come close to the ones in skydiving (ie, oxygen saturation, shock forces, and others). Further studies are needed to show the long-term effect of stress or low O2 saturation on antenatal programming, or short-term hypoxia and pregnancy outcome in pregnant skydiving women and their offspring. Pregnancy itself is a risk factor for injuries. Injuries in pregnancy are clearly associated with an unfavorable pregnancy outcome. The

  10. Mars Exploration Rover Terminal Descent Mission Modeling and Simulation

    Science.gov (United States)

    Raiszadeh, Behzad; Queen, Eric M.

    2004-01-01

    Because of NASA's added reliance on simulation for successful interplanetary missions, the MER mission has developed a detailed EDL trajectory modeling and simulation. This paper summarizes how the MER EDL sequence of events are modeled, verification of the methods used, and the inputs. This simulation is built upon a multibody parachute trajectory simulation tool that has been developed in POST I1 that accurately simulates the trajectory of multiple vehicles in flight with interacting forces. In this model the parachute and the suspended bodies are treated as 6 Degree-of-Freedom (6 DOF) bodies. The terminal descent phase of the mission consists of several Entry, Descent, Landing (EDL) events, such as parachute deployment, heatshield separation, deployment of the lander from the backshell, deployment of the airbags, RAD firings, TIRS firings, etc. For an accurate, reliable simulation these events need to be modeled seamlessly and robustly so that the simulations will remain numerically stable during Monte-Carlo simulations. This paper also summarizes how the events have been modeled, the numerical issues, and modeling challenges.

  11. X-Ray Micro-Tomography Applied to Nasa's Materials Research: Heat Shields, Parachutes and Asteroids

    Science.gov (United States)

    Panerai, Francesco; Borner, Arnaud; Ferguson, Joseph C.; Mansour, Nagi N.; Stern, Eric C.; Barnard, Harold S.; Macdowell, Alastair A.; Parkinson, Dilworth Y.

    2017-01-01

    X-ray micro-tomography is used to support the research on materials carried out at NASA Ames Research Center. The technique is applied to a variety of applications, including the ability to characterize heat shield materials for planetary entry, to study the Earth- impacting asteroids, and to improve broadcloths of spacecraft parachutes. From micro-tomography images, relevant morphological and transport properties are determined and validated against experimental data.

  12. Self-socialization: a case study of a parachute child.

    Science.gov (United States)

    Newman, Philip R; Newman, Barbara M

    2009-01-01

    The theoretical concept of self-socialization suggests that an individual is able to reflect on the self, formulate a vision of a future self, set goals, and take actions that create or alter the developmental trajectory. This case study of a parachute child illustrates how a person constructs her life from a very young age, drawing on a profound capacity for personal agency to overcome obstacles, identify resources, and internalize values to build a life structure. A model of the psychosocial process of self-socialization emerges from this case. Following the disruption of a well-defined trajectory, self-socialization is observed as a sequence of actions, reflection, correction, and new actions. Self-socialization is possible when a strong sense of self-efficacy is applied to attaining internalized values and goals.

  13. An Alternative Flight Software Trigger Paradigm: Applying Multivariate Logistic Regression to Sense Trigger Conditions Using Inaccurate or Scarce Information

    Science.gov (United States)

    Smith, Kelly M.; Gay, Robert S.; Stachowiak, Susan J.

    2013-01-01

    In late 2014, NASA will fly the Orion capsule on a Delta IV-Heavy rocket for the Exploration Flight Test-1 (EFT-1) mission. For EFT-1, the Orion capsule will be flying with a new GPS receiver and new navigation software. Given the experimental nature of the flight, the flight software must be robust to the loss of GPS measurements. Once the high-speed entry is complete, the drogue parachutes must be deployed within the proper conditions to stabilize the vehicle prior to deploying the main parachutes. When GPS is available in nominal operations, the vehicle will deploy the drogue parachutes based on an altitude trigger. However, when GPS is unavailable, the navigated altitude errors become excessively large, driving the need for a backup barometric altimeter to improve altitude knowledge. In order to increase overall robustness, the vehicle also has an alternate method of triggering the parachute deployment sequence based on planet-relative velocity if both the GPS and the barometric altimeter fail. However, this backup trigger results in large altitude errors relative to the targeted altitude. Motivated by this challenge, this paper demonstrates how logistic regression may be employed to semi-automatically generate robust triggers based on statistical analysis. Logistic regression is used as a ground processor pre-flight to develop a statistical classifier. The classifier would then be implemented in flight software and executed in real-time. This technique offers improved performance even in the face of highly inaccurate measurements. Although the logistic regression-based trigger approach will not be implemented within EFT-1 flight software, the methodology can be carried forward for future missions and vehicles.

  14. An Alternative Flight Software Paradigm: Applying Multivariate Logistic Regression to Sense Trigger Conditions using Inaccurate or Scarce Information

    Science.gov (United States)

    Smith, Kelly; Gay, Robert; Stachowiak, Susan

    2013-01-01

    In late 2014, NASA will fly the Orion capsule on a Delta IV-Heavy rocket for the Exploration Flight Test-1 (EFT-1) mission. For EFT-1, the Orion capsule will be flying with a new GPS receiver and new navigation software. Given the experimental nature of the flight, the flight software must be robust to the loss of GPS measurements. Once the high-speed entry is complete, the drogue parachutes must be deployed within the proper conditions to stabilize the vehicle prior to deploying the main parachutes. When GPS is available in nominal operations, the vehicle will deploy the drogue parachutes based on an altitude trigger. However, when GPS is unavailable, the navigated altitude errors become excessively large, driving the need for a backup barometric altimeter to improve altitude knowledge. In order to increase overall robustness, the vehicle also has an alternate method of triggering the parachute deployment sequence based on planet-relative velocity if both the GPS and the barometric altimeter fail. However, this backup trigger results in large altitude errors relative to the targeted altitude. Motivated by this challenge, this paper demonstrates how logistic regression may be employed to semi-automatically generate robust triggers based on statistical analysis. Logistic regression is used as a ground processor pre-flight to develop a statistical classifier. The classifier would then be implemented in flight software and executed in real-time. This technique offers improved performance even in the face of highly inaccurate measurements. Although the logistic regression-based trigger approach will not be implemented within EFT-1 flight software, the methodology can be carried forward for future missions and vehicles

  15. Quality function deployment

    International Nuclear Information System (INIS)

    1981-10-01

    This book indicates quality function deployment with quality and deployment of quality function, process and prospect of quality function deployment and development, product process and conception of quality table, deployment of quality demand, design of quality table and application of concurrent multi design, progress design and quality development, main safe part and management of important function part, quality development and deployment of method of construction, quality deployment and economics, total system of quality function deployment and task of quality function deployment in the present and future.

  16. A Dropsonde UAV for Atmospheric Sensing in a Turbulent Environment, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Dropsondes are one of the primary atmospheric measurement tools available to researchers. Current dropsondes are deployed with a free fall parachute trajectory,...

  17. A Dropsonde Glider with Adaptive Trajectory Planning, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Dropsondes are one of the primary atmospheric measurement tools available to researchers. Current dropsondes are deployed with a free fall parachute trajectory,...

  18. A influência de palmares e parachute na coordenação dos nados

    OpenAIRE

    Thiago Telles

    2012-01-01

    Resumo: A natação é uma modalidade esportiva que, ao longo dos anos, sofreu modificações, atingindo um alto nível de exigência, o que é refletido nas sessões de treinamentos e nas pesquisas sobre a modalidade. Sendo assim, para otimizar o deslocamento nos nadadores pode-se otimizar a força propulsora. Para isso, pode-se utilizar palmares e parachute. Os palmares tem como função promover o aumento artificial da área da mão, desta maneira, aumenta-se a área frontal da mão do sujeito em contato ...

  19. Freestyle swimming technique variations using a parachute Variaciones en la técnica de crol durante el nado resistido con paracaídas

    Directory of Open Access Journals (Sweden)

    J.M. García

    2010-09-01

    Full Text Available

    The appearance of new assistance materials like the parachute make it necessary for coaches to know about the impact that such devices have in swimming. To study this theme 16 national and international swimmers between 19 and 24 years old have been selected. The swimmers participated in four tests that consisted in freestyle (crawl stroke swimming for 10 and 45 seconds at maximum intensity, both with and without the parachute. These tests analysed stroke frequency and stroke length. A within-subjects design has been applied and a study of the facts has been made with an AVAR with repeat measures. The results indicate that the stroke frequency decreases (p<0.05 in the parachute swim during the 10 and 45 second tests, compared with the normal swim. It was also observed that the stroke frequency is higher (p<0.01 in the 10 second test than in the 45 second test. The stroke length is higher (p<0.01 in the normal swim test than in the parachute test. With respect to the swim periods of time, the stroke length is higher (p<0.01 in the 45 second test than in the 10 second test. The parachute swim produces important changes in stroke frequency and stroke length in both the 10 and 45 second tests in subjects swimming the freestyle at maximum intensity.
    KEY WORDS: swimming, swim resistance, parachute, crawl, freestyle,. stroke frequency, stroke length.

    La aparición de nuevos materiales auxiliares, como el paracaídas, hace necesario que los entrenadores conozcan las modificaciones que estos producen durante el nado. Para conseguir este objetivo se seleccionaron a 16 nadadores de nivel nacional e internacional comprendidos entre los 19 y 24 años. Éstos realizaron cuatro pruebas que consistieron en nadar a crol durante 10 y 45 segundos a máxima intensidad, utilizando el nado normal (NN y el nado resistido con paracaídas (NRCP. En estas pruebas se analizaron las variables

  20. Deployment Repeatability

    Science.gov (United States)

    2016-04-01

    evaluating the deployment repeatability builds upon the testing or analysis of deployment kinematics (Chapter 6) and adds repetition. Introduction...material yield or failure during a test. For the purposes of this chapter, zero shift will refer to permanent changes in the structure, while reversible ...the content of other chapters in this book: Gravity Compensation (Chapter 4) and Deployment Kinematics and Dynamics (Chapter 6). Repeating the

  1. Efeitos do treinamento de força específico no desempenho de nadadores velocistas treinados com parachute

    Directory of Open Access Journals (Sweden)

    Danilo Sales Bocalini

    2010-09-01

    Full Text Available OBJETIVO: verificar os efeitos do treinamento de força específico no desempenho de nadadores velocistas. METODOLOGIA: dois grupos de nadadores randomizados em treinados sem (TSP, n: 8 e com parachute (TCP, n: 12 foram submetidos a treinamento de 12 semanas (6 x semana; 1 sessão de 2 h/dia, sendo avaliados a força muscular (FMMI; a força específica (FE e o tempo de sustentação de força (TSF; o número de braçadas em 50m (NB 50m; o tempo e a velocidade de nado em 15 (V 15m e 50m (V 50m, antes e após o protocolo. RESULTADOS: após o programa de treinamento, não ocorreram modificações na FMMI e V 15m para ambos os grupos. Nas demais variáveis houve melhora significante (p 18%; FE (> 30%; TSF (> 35%; NB 50m ( 16%. O grupo TSP apresentou melhora no TSF (> 9%. CONCLUSÃO: o emprego do parachute foi eficiente em melhorar os parâmetros de força e no desempenho no teste de 50m

  2. Critical Spacecraft-to-Earth Communications for Mars Exploration Rover (MER) entry, descent and landing

    Science.gov (United States)

    Hurd, William J.; Estabrook, Polly; Racho, Caroline S.; Satorius, Edgar H.

    2002-01-01

    For planetary lander missions, the most challenging phase of the spacecraft to ground communications is during the entry, descent, and landing (EDL). As each 2003 Mars Exploration Rover (MER) enters the Martian atmosphere, it slows dramatically. The extreme acceleration and jerk cause extreme Doppler dynamics on the X-band signal received on Earth. When the vehicle slows sufficiently, the parachute is deployed, causing almost a step in deceleration. After parachute deployment, the lander is lowered beneath the parachute on a bridle. The swinging motion of the lander imparts high Doppler dynamics on the signal and causes the received signal strength to vary widely, due to changing antenna pointing angles. All this time, the vehicle transmits important health and status information that is especially critical if the landing is not successful. Even using the largest Deep Space Network antennas, the weak signal and high dynamics render it impossible to conduct reliable phase coherent communications. Therefore, a specialized form of frequency-shift-keying will be used. This paper describes the EDL scenario, the signal conditions, the methods used to detect and frequency-track the carrier and to detect the data modulation, and the resulting performance estimates.

  3. Mastering Windows 7 Deployment

    CERN Document Server

    Finn, Aidan; van Surksum, Kenneth

    2011-01-01

    Get professional-level instruction on Windows 7 deployment tools Enterprise-level operating system deployment is challenging and requires knowledge of specific tools. It is expected that Windows 7 will be extensively deployed in businesses worldwide. This comprehensive Sybex guide provides thorough coverage of the Microsoft deployment tools that were specifically created for Windows 7, preparing system administrators, MIS professionals, and corporate programmers to tackle the task effectively.Companies worldwide are expected to deploy Windows 7 as their enterprise operating system; system admi

  4. The PARAChute Project: Remote Monitoring of Posture and Gait for Fall Prevention

    Science.gov (United States)

    Hewson, David J.; Duchêne, Jacques; Charpillet, François; Saboune, Jamal; Michel-Pellegrino, Valérie; Amoud, Hassan; Doussot, Michel; Paysant, Jean; Boyer, Anne; Hogrel, Jean-Yves

    2007-12-01

    Falls in the elderly are a major public health problem due to both their frequency and their medical and social consequences. In France alone, more than two million people aged over 65 years old fall each year, leading to more than 9 000 deaths, in particular in those over 75 years old (more than 8 000 deaths). This paper describes the PARAChute project, which aims to develop a methodology that will enable the detection of an increased risk of falling in community-dwelling elderly. The methods used for a remote noninvasive assessment for static and dynamic balance assessments and gait analysis are described. The final result of the project has been the development of an algorithm for movement detection during gait and a balance signature extracted from a force plate. A multicentre longitudinal evaluation of balance has commenced in order to validate the methodologies and technologies developed in the project.

  5. Mars Science Laboratory Entry Guidance Improvements for Mars 2018 (DRAFT)

    Science.gov (United States)

    Garcia-Llama, Eduardo; Winski, Richard G.; Shidner, Jeremy D.; Ivanov, Mark C.; Grover, Myron R.; Prakash, Ravi

    2011-01-01

    In 2011, the Mars Science Laboratory (MSL) will be launched in a mission to deliver the largest and most capable rover to date to the surface of Mars. A follow on MSL-derived mission, referred to as Mars 2018, is planned for 2018. Mars 2018 goals include performance enhancements of the Entry, Descent and Landing over that of its predecessor MSL mission of 2011. This paper will discuss the main elements of the modified 2018 EDL preliminary design that will increase performance on the entry phase of the mission. In particular, these elements will increase the parachute deploy altitude to allow for more time margin during the subsequent descent and landing phases and reduce the delivery ellipse size at parachute deploy through modifications in the entry reference trajectory design, guidance trigger logic design, and the effect of additional navigation hardware.

  6. Pre-deployment dissociation and personality as risk factors for post-deployment post-traumatic stress disorder in Danish soldiers deployed to Afghanistan

    DEFF Research Database (Denmark)

    Ponce de León, Beatriz; Andersen, Søren; Karstoft, Karen Inge

    2018-01-01

    Objective: This study investigated whether pre-deployment dissociation was associated with previously identified post-traumatic stress disorder (PTSD) symptom trajectories from before to 2.5 years after military deployment. Furthermore, it examined whether the tendency to dissociate, pre-deployme......Objective: This study investigated whether pre-deployment dissociation was associated with previously identified post-traumatic stress disorder (PTSD) symptom trajectories from before to 2.5 years after military deployment. Furthermore, it examined whether the tendency to dissociate, pre...

  7. The PARAChute Project: Remote Monitoring of Posture and Gait for Fall Prevention

    Directory of Open Access Journals (Sweden)

    Anne Boyer

    2007-01-01

    Full Text Available Falls in the elderly are a major public health problem due to both their frequency and their medical and social consequences. In France alone, more than two million people aged over 65 years old fall each year, leading to more than 9 000 deaths, in particular in those over 75 years old (more than 8 000 deaths. This paper describes the PARAChute project, which aims to develop a methodology that will enable the detection of an increased risk of falling in community-dwelling elderly. The methods used for a remote noninvasive assessment for static and dynamic balance assessments and gait analysis are described. The final result of the project has been the development of an algorithm for movement detection during gait and a balance signature extracted from a force plate. A multicentre longitudinal evaluation of balance has commenced in order to validate the methodologies and technologies developed in the project.

  8. Low Density Supersonic Decelerator Flight Dynamics Test-1 Flight Design and Targeting

    Science.gov (United States)

    Ivanov, Mark

    2015-01-01

    NASA's Low Density Supersonic Decelerator (LDSD) program was established to identify, develop, and eventually qualify to Test [i.e. Technology] Readiness Level (TRL) - 6 aerodynamic decelerators for eventual use on Mars. Through comprehensive Mars application studies, two distinct Supersonic Inflatable Aerodynamic Decelerator (SIAD) designs were chosen that afforded the optimum balance of benefit, cost, and development risk. In addition, a Supersonic Disk Sail (SSDS) parachute design was chosen that satisfied the same criteria. The final phase of the multi-tiered qualification process involves Earth Supersonic Flight Dynamics Tests (SFDTs) within environmental conditions similar to those that would be experienced during a Mars Entry, Descent, and Landing (EDL) mission. The first of these flight tests (i.e. SFDT-1) was completed on June 28, 2014 with two more tests scheduled for the summer of 2015 and 2016, respectively. The basic flight design for all the SFDT flights is for the SFDT test vehicle to be ferried to a float altitude of 120 kilo-feet by a 34 thousand cubic feet (Mcf) heavy lift helium balloon. Once float altitude is reached, the test vehicle is released from the balloon, spun-up for stability, and accelerated to supersonic speeds using a Star48 solid rocket motor. After burnout of the Star48 motor the vehicle decelerates to pre-flight selected test conditions for the deployment of the SIAD system. After further deceleration with the SIAD deployed, the SSDS parachute is then deployed stressing the performance of the parachute in the wake of the SIAD augmented blunt body. The test vehicle/SIAD/parachute system then descends to splashdown in the Pacific Ocean for eventual recovery. This paper will discuss the development of both the test vehicle and the trajectory sequence including design trade-offs resulting from the interaction of both engineering efforts. In addition, the SFDT-1 nominal trajectory design and associated sensitivities will be discussed

  9. Mastering Hyper-V Deployment

    CERN Document Server

    Finn, Aidan

    2010-01-01

    The only book to take an in-depth look at deploying Hyper-V. Now in its second generation, the popular Hyper-V boasts technical advances that create even more dynamic systems than ever before. This unique resource serves an authoritative guide to deploying Windows Server 2008 R2 Hyper-V comprehensively. Step-by-step instructions demonstrate how to design a Hyper-V deployment, build a Hyper-V host environment, and design a management system with System Center Virtual Machine Manager 2008 R2.: Features real-world examples that show you how to design a Hyper-V deployment, build a Hyper-V host env

  10. 50 CFR 600.506 - Observers.

    Science.gov (United States)

    2010-10-01

    ...-held, rocket-propelled, parachute, red-flare distress signals, and three orange-smoke distress signals...) of this section. (iii) The costs of travel, transportation, and per diem associated with deploying supplementary observers to foreign fishing vessels including the cost of travel, transportation, and per diem...

  11. Solar sail deployment experiment

    OpenAIRE

    Shimose, Shigeru; 下瀬 滋

    2006-01-01

    Solar Sail move by receiving momentum of photons in sunlight. This paper presents results of some Spin-Stabilized Solar Sail deployment experiment. ISAS has successfully deployed, for the first time in the world, the polyimide Solar Sail taking advantage of centrifugal force in space. Based on this result, the new deployment mechanism is being developed which retracts the 50 m diameter sail.

  12. CMS software deployment on OSG

    International Nuclear Information System (INIS)

    Kim, B; Avery, P; Thomas, M; Wuerthwein, F

    2008-01-01

    A set of software deployment tools has been developed for the installation, verification, and removal of a CMS software release. The tools that are mainly targeted for the deployment on the OSG have the features of instant release deployment, corrective resubmission of the initial installation job, and an independent web-based deployment portal with Grid security infrastructure login mechanism. We have been deploying over 500 installations and found the tools are reliable and adaptable to cope with problems with changes in the Grid computing environment and the software releases. We present the design of the tools, statistics that we gathered during the operation of the tools, and our experience with the CMS software deployment on the OSG Grid computing environment

  13. CMS software deployment on OSG

    Energy Technology Data Exchange (ETDEWEB)

    Kim, B; Avery, P [University of Florida, Gainesville, FL 32611 (United States); Thomas, M [California Institute of Technology, Pasadena, CA 91125 (United States); Wuerthwein, F [University of California at San Diego, La Jolla, CA 92093 (United States)], E-mail: bockjoo@phys.ufl.edu, E-mail: thomas@hep.caltech.edu, E-mail: avery@phys.ufl.edu, E-mail: fkw@fnal.gov

    2008-07-15

    A set of software deployment tools has been developed for the installation, verification, and removal of a CMS software release. The tools that are mainly targeted for the deployment on the OSG have the features of instant release deployment, corrective resubmission of the initial installation job, and an independent web-based deployment portal with Grid security infrastructure login mechanism. We have been deploying over 500 installations and found the tools are reliable and adaptable to cope with problems with changes in the Grid computing environment and the software releases. We present the design of the tools, statistics that we gathered during the operation of the tools, and our experience with the CMS software deployment on the OSG Grid computing environment.

  14. Gender differences in the effects of deployment-related stressors and pre-deployment risk factors on the development of PTSD symptoms in National Guard Soldiers deployed to Iraq and Afghanistan.

    Science.gov (United States)

    Polusny, Melissa A; Kumpula, Mandy J; Meis, Laura A; Erbes, Christopher R; Arbisi, Paul A; Murdoch, Maureen; Thuras, Paul; Kehle-Forbes, Shannon M; Johnson, Alexandria K

    2014-02-01

    Although women in the military are exposed to combat and its aftermath, little is known about whether combat as well as pre-deployment risk/protective factors differentially predict post-deployment PTSD symptoms among women compared to men. The current study assesses the influence of combat-related stressors and pre-deployment risk/protective factors on women's risk of developing PTSD symptoms following deployment relative to men's risk. Participants were 801 US National Guard Soldiers (712 men, 89 women) deployed to Iraq or Afghanistan who completed measures of potential risk/protective factors and PTSD symptoms one month before deployment (Time 1) and measures of deployment-related stressors and PTSD symptoms about 2-3 months after returning from deployment (Time 2). Men reported greater exposure to combat situations than women, while women reported greater sexual stressors during deployment than men. Exposure to the aftermath of combat (e.g., witnessing injured/dying people) did not differ by gender. At Time 2, women reported more severe PTSD symptoms and higher rates of probable PTSD than did men. Gender remained a predictor of higher PTSD symptoms after accounting for pre-deployment symptoms, prior interpersonal victimization, and combat related stressors. Gender moderated the association between several risk factors (combat-related stressors, prior interpersonal victimization, lack of unit support and pre-deployment concerns about life/family disruptions) and post-deployment PTSD symptoms. Elevated PTSD symptoms among female service members were not explained simply by gender differences in pre-deployment or deployment-related risk factors. Combat related stressors, prior interpersonal victimization, and pre-deployment concerns about life and family disruptions during deployment were differentially associated with greater post-deployment PTSD symptoms for women than men. Copyright © 2013 The Authors. Published by Elsevier Ltd.. All rights reserved.

  15. Apollo Soyuz mission, toxic gas entered cabin during earth landing sequence

    Science.gov (United States)

    1975-01-01

    A postflight analysis is presented of the sequence which caused toxic gas to enter the cabin during repressurization for 30 seconds from manual deployment of the drogue parachutes at 18,550 feet to disabling of the reaction control system at 9600 feet. Results and conclusions are discussed.

  16. Tether Deployer And Brake

    Science.gov (United States)

    Carroll, Joseph A.; Alexander, Charles M.

    1993-01-01

    Design concept promises speed, control, and reliability. Scheme for deploying tether provides for fast, free, and snagless payout and fast, dependable braking. Developed for small, expendable tethers in outer space, scheme also useful in laying transoceanic cables, deploying guidance wires to torpedoes and missiles, paying out rescue lines from ship to ship via rockets, deploying antenna wires, releasing communication and power cables to sonobuoys and expendable bathythermographs, and in reeling out lines from fishing rods.

  17. Fusion Power Deployment

    International Nuclear Information System (INIS)

    Schmidt, J.A.; Ogden, J.M.

    2002-01-01

    Fusion power plants could be part of a future portfolio of non-carbon dioxide producing energy supplies such as wind, solar, biomass, advanced fission power, and fossil energy with carbon dioxide sequestration. In this paper, we discuss key issues that could impact fusion energy deployment during the last half of this century. These include geographic issues such as resource availability, scale issues, energy storage requirements, and waste issues. The resource needs and waste production associated with fusion deployment in the U.S. should not pose serious problems. One important feature of fusion power is the fact that a fusion power plant should be locatable within most local or regional electrical distribution systems. For this reason, fusion power plants should not increase the burden of long distance power transmission to our distribution system. In contrast to fusion power, regional factors could play an important role in the deployment of renewable resources such as wind, solar and biomass or fossil energy with CO2 sequestration. We examine the role of these regional factors and their implications for fusion power deployment

  18. Part 8. Deployment considerations

    International Nuclear Information System (INIS)

    Dance, K.D.; Chang, Y.I.; Daly, T.A.

    1980-01-01

    This report addresses considerations of fast breeder reactor development and deployment from a national perspective. Nations vary greatly in their expertise and interest relative to nuclear power, and hence a single set of steps to be taken by a nation in decision-making on breeder development and deployment cannot be presented. The approach taken in this report is to present discussions on key factors influencing the breeder development and deployment decisions, especially in non-breeder nations, by drawing upon historical perspectives of the Light Water Reactor for comparison

  19. Comparing post-deployment mental health services utilization in soldiers deployed to Balkan, Iraq and Afghanistan

    DEFF Research Database (Denmark)

    Madsen, T; Sadowa Vedtofte, M; Nordentoft, M

    2017-01-01

    OBJECTIVE: Insight on how different missions have impacted rates of mental health service (MHS) utilization is unexplored. We compared postdeployment MHS utilization in a national cohort of first-time deployed to missions in Balkan, Iraq, and Afghanistan respectively. METHODS: A prospective...... national cohort study of 13 246 first-time deployed in the period 1996 through 2012 to missions in Balkan area, Iraq, or Afghanistan respectively. Soldiers 'MHS utilization was also compared with a 5:1 sex-, age-, and calendar year-matched never-deployed background population. Postdeployment utilization...... of psychotropics. RESULTS: Utilizing of psychiatric outpatient services and psychotropics was significantly higher in first-time deployed to Iraq and Afghanistan compared with deployed to Balkan. However, the rate of postdeployment admission to psychiatric hospital did not differ between missions. Postdeployment...

  20. What pre-deployment and early post-deployment factors predict health function after combat deployment?: a prospective longitudinal study of Operation Enduring Freedom (OEF)/Operation Iraqi Freedom (OIF) soldiers.

    Science.gov (United States)

    McAndrew, Lisa M; D'Andrea, Elizabeth; Lu, Shou-En; Abbi, Bhavna; Yan, Grace W; Engel, Charles; Quigley, Karen S

    2013-04-30

    Physical and mental function are strong indicators of disability and mortality. OEF/OIF Veterans returning from deployment have been found to have poorer function than soldiers who have not deployed; however the reasons for this are unknown. A prospective cohort of 790 soldiers was assessed both pre- and immediately after deployment to determine predictors of physical and mental function after war. On average, OEF/OIF Veterans showed significant declines in both physical (t=6.65, pfunction (t=7.11, pdeployment function, poorer physical function after deployment was associated with older age, more physical symptoms, blunted systolic blood pressure reactivity and being injured. After controlling for pre-deployment function, poorer mental function after deployment was associated with younger age, lower social desirability, lower social support, greater physical symptoms and greater PTSD symptoms. Combat deployment was associated with an immediate decline in both mental and physical function. The relationship of combat deployment to function is complex and influenced by demographic, psychosocial, physiological and experiential factors. Social support and physical symptoms emerged as potentially modifiable factors.

  1. EDITORIAL Wireless sensor networks: design for real-life deployment and deployment experiences Wireless sensor networks: design for real-life deployment and deployment experiences

    Science.gov (United States)

    Gaura, Elena; Roedig, Utz; Brusey, James

    2010-12-01

    Wireless sensor networks (WSNs) are among the most promising technologies of the new millennium. The opportunities afforded by being able to program networks of small, lightweight, low-power, computation- and bandwidth-limited nodes have attracted a large community of researchers and developers. However, the unique set of capabilities offered by the technology produces an exciting but complex design space, which is often difficult to negotiate in an application context. Deploying sensing physical environments produces its own set of challenges, and can push systems into failure modes, thus revealing problems that can be difficult to discover or reproduce in simulation or the laboratory. Sustained efforts in the area of wireless networked sensing over the last 15 years have resulted in a large number of theoretical developments, substantial practical achievements, and a wealth of lessons for the future. It is clear that in order to bridge the gap between (on the one hand) visions of very large scale, autonomous, randomly deployed networks and (on the other) the actual performance of fielded systems, we need to view deployment as an essential component in the process of developing sensor networks: a process that includes hardware and software solutions that serve specific applications and end-user needs. Incorporating deployment into the design process reveals a new and different set of requirements and considerations, whose solutions require innovative thinking, multidisciplinary teams and strong involvement from end-user communities. This special feature uncovers and documents some of the hurdles encountered and solutions offered by experimental scientists when deploying and evaluating wireless sensor networks in situ, in a variety of well specified application scenarios. The papers specifically address issues of generic importance for WSN system designers: (i) data quality, (ii) communications availability and quality, (iii) alternative, low-energy sensing

  2. The impact of antecedent trauma exposure and mental health symptoms on the post-deployment mental health of Afghanistan-deployed Australian troops.

    Science.gov (United States)

    Searle, Amelia K; Van Hooff, Miranda; Lawrence-Wood, Ellie R; Grace, Blair S; Saccone, Elizabeth J; Davy, Carol P; Lorimer, Michelle; McFarlane, Alexander C

    2017-10-01

    Both traumatic deployment experiences and antecedent traumas increase personnel's risk of developing PTSD and depression. However, only cross-sectional studies have assessed whether antecedent trauma moderates stress reactions to deployment experiences. This study prospectively examines whether antecedent trauma moderates the association between deployment trauma and post-deployment PTSD and depressive symptoms after accounting for antecedent mental health problems, in a large Australian Defence Force (ADF) sample. In the ADF Middle East Area of Operations Prospective Study, currently-serving military personnel deployed to Afghanistan across 2010-2012 (n = 1122) completed self-reported measures at pre-deployment and post-deployment. Within multivariable regressions, associations between deployment trauma and PTSD and depressive symptoms at post-deployment were stronger for personnel with greater antecedent trauma. However, once adjusting for antecedent mental health problems, these significant interaction effects disappeared. Instead, deployment-related trauma and antecedent mental health problems showed direct associations with post-deployment mental health problems. Antecedent trauma was also indirectly associated with post-deployment mental health problems through antecedent mental health problems. Similar associations were seen with prior combat exposure as a moderator. Antecedent and deployment trauma were reported retrospectively. Self-reports may also suffer from social desirability bias, especially at pre-deployment. Our main effects results support the pervasive and cumulative negative effect of trauma on military personnel, regardless of its source. While antecedent trauma does not amplify personnel's psychological response to deployment trauma, it is indirectly associated with increased post-deployment mental health problems. Antecedent mental health should be considered within pre-deployment prevention programs, and deployment-trauma within post

  3. 5-Beam ADCP Deployment Strategy Considerations

    Science.gov (United States)

    Moore, T.; Savidge, D. K.; Gargett, A.

    2016-02-01

    With the increasing availability of 5 beam ADCPs and expanding opportunities for their deployment within both observatory and dedicated process study settings, refinements in deployment strategies are needed.Measuring vertical velocities directly with a vertically oriented acoustic beam requires that the instrument be stably mounted and leveled within fractions of a degree. Leveled shallow water deployments to date have utilized divers to jet pipes into the sand for stability, manually mount the instruments on the pipes, and level them. Leveling has been guided by the deployed instrument's pitch and roll output, available in real-time because of the observatory settings in which the deployments occurred. To expand the range of feasible deployments to deeper, perhaps non-real-time capable settings, alternatives to diver deployment and leveling must be considered. To determine stability requirements, mooring motion (heading, pitch and roll) has been sampled at 1Hz by gimballed ADCPs at a range of instrument deployment depths, and in shrouded and unshrouded cages. Conditions under which ADCP cages resting on the bottom experience significant shifts in tilt, roll or heading are assessed using co-located wind and wave measurements. The accuracy of estimating vertical velocities using all five beams relative to a well leveled vertical single beam is assessed from archived high frequency five beam data, to explore whether easing the leveling requirement is feasible.

  4. Rapid deployment intrusion detection system

    International Nuclear Information System (INIS)

    Graham, R.H.

    1997-01-01

    A rapidly deployable security system is one that provides intrusion detection, assessment, communications, and annunciation capabilities; is easy to install and configure; can be rapidly deployed, and is reusable. A rapidly deployable intrusion detection system (RADIDS) has many potential applications within the DOE Complex: back-up protection for failed zones in a perimeter intrusion detection and assessment system, intrusion detection and assessment capabilities in temporary locations, protection of assets during Complex reconfiguration, and protection in hazardous locations, protection of assets during Complex reconfiguration, and protection in hazardous locations. Many DOE user-need documents have indicated an interest in a rapidly deployable intrusion detection system. The purpose of the RADIDS project is to design, develop, and implement such a system. 2 figs

  5. Development and modeling of self-deployable structures

    Science.gov (United States)

    Neogi, Depankar

    Deployable space structures are prefabricated structures which can be transformed from a closed, compact configuration to a predetermined expanded form in which they are stable and can bear loads. The present research effort investigates a new family of deployable structures, called the Self-Deployable Structures (SDS). Unlike other deployable structures, which have rigid members, the SDS members are flexible while the connecting joints are rigid. The joints store the predefined geometry of the deployed structure in the collapsed state. The SDS is stress-free in both deployed and collapsed configurations and results in a self-standing structure which acquires its structural properties after a chemical reaction. Reliability of deployment is one of the most important features of the SDS, since it does not rely on mechanisms that can lock during deployment. The unit building block of these structures is the self-deployable structural element (SDSE). Several SDSE members can be linked to generate a complex building block such as a triangular or a tetrahedral structure. Different SDSE and SDS concepts are investigated in the research work, and the performance of SDS's are experimentally and theoretically explored. Triangular and tetrahedral prototype SDS have been developed and presented. Theoretical efforts include modeling the behavior of 2-dimensional SDSs. Using this design tool, engineers can study the effects of different packing configurations and deployment sequence; and perform optimization on the collapsed state of a structure with different external constraints. The model also predicts if any lockup or entanglement occurs during deployment.

  6. Modeling EERE Deployment Programs

    Energy Technology Data Exchange (ETDEWEB)

    Cort, K. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hostick, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Belzer, D. B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Livingston, O. V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-11-01

    This report compiles information and conclusions gathered as part of the “Modeling EERE Deployment Programs” project. The purpose of the project was to identify and characterize the modeling of deployment programs within the EERE Technology Development (TD) programs, address possible improvements to the modeling process, and note gaps in knowledge in which future research is needed.

  7. Advanced Deployable Structural Systems for Small Satellites

    Science.gov (United States)

    Belvin, W. Keith; Straubel, Marco; Wilkie, W. Keats; Zander, Martin E.; Fernandez, Juan M.; Hillebrandt, Martin F.

    2016-01-01

    One of the key challenges for small satellites is packaging and reliable deployment of structural booms and arrays used for power, communication, and scientific instruments. The lack of reliable and efficient boom and membrane deployment concepts for small satellites is addressed in this work through a collaborative project between NASA and DLR. The paper provides a state of the art overview on existing spacecraft deployable appendages, the special requirements for small satellites, and initial concepts for deployable booms and arrays needed for various small satellite applications. The goal is to enhance deployable boom predictability and ground testability, develop designs that are tolerant of manufacturing imperfections, and incorporate simple and reliable deployment systems.

  8. Influencing Factors of the Initiation Point in the Parachute-Bomb Dynamic Detonation System

    Science.gov (United States)

    Qizhong, Li; Ye, Wang; Zhongqi, Wang; Chunhua, Bai

    2017-12-01

    The parachute system has been widely applied in modern armament design, especially for the fuel-air explosives. Because detonation of fuel-air explosives occurs during flight, it is necessary to investigate the influences of the initiation point to ensure successful dynamic detonation. In fact, the initiating position exist the falling area in the fuels, due to the error of influencing factors. In this paper, the major influencing factors of initiation point were explored with airdrop and the regularity between initiation point area and factors were obtained. Based on the regularity, the volume equation of initiation point area was established to predict the range of initiation point in the fuel. The analysis results showed that the initiation point appeared area, scattered on account of the error of attitude angle, secondary initiation charge velocity, and delay time. The attitude angle was the major influencing factors on a horizontal axis. On the contrary, secondary initiation charge velocity and delay time were the major influencing factors on a horizontal axis. Overall, the geometries of initiation point area were sector coupled with the errors of the attitude angle, secondary initiation charge velocity, and delay time.

  9. Non-traditional Infrasound Deployment

    Science.gov (United States)

    McKenna, M. H.; McComas, S.; Simpson, C. P.; Diaz-Alvarez, H.; Costley, R. D.; Hayward, C.; Golden, P.; Endress, A.

    2017-12-01

    Historically, infrasound arrays have been deployed in rural environments where anthropological noise sources are limited. As interest in monitoring low energy sources at local distances grows in the infrasound community, it will be vital to understand how to monitor infrasound sources in an urban environment. Arrays deployed in urban centers have to overcome the decreased signal-to-noise ratio and reduced amount of real estate available to deploy an array. To advance the understanding of monitoring infrasound sources in urban environments, local and regional infrasound arrays were deployed on building rooftops on the campus at Southern Methodist University (SMU), and data were collected for one seasonal cycle. The data were evaluated for structural source signals (continuous-wave packets), and when a signal was identified, the back azimuth to the source was determined through frequency-wavenumber analysis. This information was used to identify hypothesized structural sources; these sources were verified through direct measurement and dynamic structural analysis modeling. In addition to the rooftop arrays, a camouflaged infrasound sensor was installed on the SMU campus and evaluated to determine its effectiveness for wind noise reduction. Permission to publish was granted by Director, Geotechnical and Structures Laboratory.

  10. Deployable Brake for Spacecraft

    Science.gov (United States)

    Rausch, J. R.; Maloney, J. W.

    1987-01-01

    Aerodynamic shield that could be opened and closed proposed. Report presents concepts for deployable aerodynamic brake. Brake used by spacecraft returning from high orbit to low orbit around Earth. Spacecraft makes grazing passes through atmosphere to slow down by drag of brake. Brake flexible shield made of woven metal or ceramic withstanding high temperatures created by air friction. Stored until needed, then deployed by set of struts.

  11. Accommodating Thickness in Origami-Based Deployable Arrays

    Science.gov (United States)

    Zirbel, Shannon A.; Magleby, Spencer P.; Howell, Larry L.; Lang, Robert J.; Thomson, Mark W.; Sigel, Deborah A.; Walkemeyer, Phillip E.; Trease, Brian P.

    2013-01-01

    The purpose of this work is to create deployment systems with a large ratio of stowed-to-deployed diameter. Deployment from a compact form to a final flat state can be achieved through origami-inspired folding of panels. There are many models capable of this motion when folded in a material with negligible thickness; however, when the application requires the folding of thick, rigid panels, attention must be paid to the effect of material thickness not only on the final folded state, but also during the folding motion (i.e., the panels must not be required to flex to attain the final folded form). The objective is to develop new methods for deployment from a compact folded form to a large circular array (or other final form). This paper describes a mathematical model for modifying the pattern to accommodate material thickness in the context of the design, modeling, and testing of a deployable system inspired by an origami six-sided flasher model. The model is demonstrated in hardware as a 1/20th scale prototype of a deployable solar array for space applications. The resulting prototype has a ratio of stowed-to-deployed diameter of 9.2 (or 1.25 m deployed outer diameter to 0.136 m stowed outer diameter).

  12. Parachute Creek Shale Oil Program Environmental Monitoring Program. Quarterly report, fourth quarter, October 1-December 31, 1991

    International Nuclear Information System (INIS)

    1992-01-01

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The Program agreed to comply with existing environmental monitoring regulations and to develop an Environmental Monitoring Plan (EMP) incorporating supplemental monitoring in the areas of water, air, solid waste, and worker health and safety during the period 1985-1992. These activities are described in a series of quarterly and annual reports. The document contains environmental compliance data collected in the fourth quarter of 1991, contents of reports on compliance data submitted to regulatory agencies, and supplemental analytical results from retorted shale pile runoff water collected following a storm event during the third quarter of 1991

  13. Supporting Knowledge Transfer in IS Deployment Projects

    Science.gov (United States)

    Schönström, Mikael

    To deploy new information systems is an expensive and complex task, and does seldom result in successful usage where the system adds strategic value to the firm (e.g. Sharma et al. 2003). It has been argued that innovation diffusion is a knowledge integration problem (Newell et al. 2000). Knowledge about business processes, deployment processes, information systems and technology are needed in a large-scale deployment of a corporate IS. These deployments can therefore to a large extent be argued to be a knowledge management (KM) problem. An effective deployment requires that knowledge about the system is effectively transferred to the target organization (Ko et al. 2005).

  14. Smart nanogrid systems for disaster mitigation employing deployable renewable energy harvesting devices

    Science.gov (United States)

    Ghasemi-Nejhad, Mehrdad N.; Menendez, Michael; Minei, Brenden; Wong, Kyle; Gabrick, Caton; Thornton, Matsu; Ghorbani, Reza

    2016-04-01

    in a variety of extreme environments and can be parachuted into the needed locations. The Smart Nanogrid Systems will have sensors that will sense the environmental conditions for the wind turbines and solar panels for maximum energy harvesting as well as identifying the appliances in use. These signal will be sent to a control system to send signal to the energy harvester actuators to maximize the power generation as well as regulating the power, i.e., either send the power to the appliances and consumer devices or send the power to the batteries and capacitors for energy storage, if the power is being generated but there are no consumer appliances in use, making it a "smart nanogrid deployable renewable energy harvesting system."

  15. The effect of military deployment on mental health

    DEFF Research Database (Denmark)

    Lyk-Jensen, Stéphanie; Weatherall, Cecilie Dohlmann; W. Jepsen, Peter

    for the non-deployed eligible men, and our results hold to various robustness checks. Our administrative records provide objective measures of mental health service use in the form of psychiatric diagnoses and purchase of mental health-related medication. The very rich data makes it possible to control......In this paper we estimate the causal effect of military deployment on soldiers’ mental health. To handle the selection bias problem, we use longitudinal data for deployed and non-deployed eligible men in a difference-in-differences setting. Using pair-wise matching, we impute deployment dates...... for important variables like intelligence tests and family background. We find significant adverse effects of military deployment on soldiers’ mental health service use. Highlights: - Causal effect of military deployment on soldiers’ use of mental health service - Using a difference-in-differences approach...

  16. Rover deployment system for lunar landing mission

    Science.gov (United States)

    Sutoh, Masataku; Hoshino, Takeshi; Wakabayashi, Sachiko

    2017-09-01

    For lunar surface exploration, a deployment system is necessary to allow a rover to leave the lander. The system should be as lightweight as possible and stored retracted when launched. In this paper, two types of retractable deployment systems for lunar landing missions, telescopic- and fold-type ramps, are discussed. In the telescopic-type system, a ramp is stored with the sections overlapping and slides out during deployment. In the fold-type system, it is stored folded and unfolds for the deployment. For the development of these ramps, a design concept study and structural analysis were conducted first. Subsequently, ramp deployment and rover release tests were performed using the developed ramp prototypes. Through these tests, the validity of their design concepts and functions have been confirmed. In the rover release test, it was observed that the developed lightweight ramp was sufficiently strong for a 50-kg rover to descend. This result suggests that this ramp system is suitable for the deployment of a 300-kg-class rover on the Moon, where the gravity is about one-sixth that on Earth. The lightweight and sturdy ramp developed in this study will contribute to both safe rover deployment and increase of lander/rover payload.

  17. Unocal Parachute Creek Shale Oil Program Environmental Monitoring Program. Annual report, October 1, 1990-December 31, 1991

    International Nuclear Information System (INIS)

    1992-01-01

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The Program agreed to comply with existing environmental monitoring regulations and to develop an Environmental Monitoring Plan (EMP) incorporating supplemental monitoring in the areas of water, air, solid waste, and worker health and safety during the period 1985-1992. These activities are described in a series of quarterly and annual reports. The report contains summaries of compliance and supplemental environmental and industrial hygiene and health surveillance monitoring conducted during the period; compliance permits, permit changes, and Notices of Violations discussions; statistical significance of Employee General Health information, medical histories, physical exams, pulmonary functions, clinical tests and demographics; independent audit reports; and a description of retorted shale disposal activities

  18. Security Support in Continuous Deployment Pipeline

    DEFF Research Database (Denmark)

    Ullah, Faheem; Raft, Adam Johannes; Shahin, Mojtaba

    2017-01-01

    Continuous Deployment (CD) has emerged as a new practice in the software industry to continuously and automatically deploy software changes into production. Continuous Deployment Pipeline (CDP) supports CD practice by transferring the changes from the repository to production. Since most of the CDP...... penetration tools. Our findings indicate that the applied tactics improve the security of the major components (i.e., repository, continuous integration server, main server) of a CDP by controlling access to the components and establishing secure connections....

  19. Advanced OS deployment system

    OpenAIRE

    Galiano Molina, Sebastián

    2007-01-01

    The main project’s objective is to design and build an OS deployment system taking advantage of the Linux OS and the Open Source community developments. This means to use existing technologies that modularize the system. With this philosophy in mind, the number of developed code lines within the project is keeping as small as possible. As REMBO, the OS deployment system to develop has to be transparent to the user. This means a system with a friendly user interface and no te...

  20. Renewable Energy: Policy Considerations for Deploying Renewables

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This information paper accompanies the IEA publication Deploying Renewables 2011: Best and Future Policy Practice (IEA, 2011a). It provides more detailed data and analysis on policies for Deploying Renewables, and is intended to complement the main publication. It provides an account of the strategic drivers underpinning renewable energy (RE) technology deployment (energy security, economic development and environment protection) and assesses RE technologies with respect to these drivers, including an estimate of GHG emissions reductions due to RE technologies. The paper also explores the different barriers to deploying renewables at a given stage of market maturity and discusses what tools policy makers can avail of to succeed in removing deployment barriers. An additional topical highlight explores the challenges associated with accelerating the diffusion of RE technologies in developing countries.

  1. Deployment Health Surveillance

    National Research Council Canada - National Science Library

    DeNicola, Anthony D

    2004-01-01

    .... Gulf War health questions have resulted in controversy over potentially hazardous exposures during the deployment, the possibility of adverse affects from preventive health measures, and the role...

  2. Early identification of posttraumatic stress following military deployment

    DEFF Research Database (Denmark)

    Karstoft, Karen-Inge; Statnikov, Alexander; Andersen, Søren B

    2015-01-01

    BACKGROUND: Pre-deployment identification of soldiers at risk for long-term posttraumatic stress psychopathology after home coming is important to guide decisions about deployment. Early post-deployment identification can direct early interventions to those in need and thereby prevents...... the development of chronic psychopathology. Both hold significant public health benefits given large numbers of deployed soldiers, but has so far not been achieved. Here, we aim to assess the potential for pre- and early post-deployment prediction of resilience or posttraumatic stress development in soldiers...... by application of machine learning (ML) methods. METHODS: ML feature selection and prediction algorithms were applied to a prospective cohort of 561 Danish soldiers deployed to Afghanistan in 2009 to identify unique risk indicators and forecast long-term posttraumatic stress responses. RESULTS: Robust pre...

  3. Deploying Renewables - Best and Future Policy Practice

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-11-23

    The global energy system faces urgent challenges. Concerns about energy security are growing, as highlighted by the recent political turmoil in Northern Africa and the nuclear incident in Fukushima. At the same time, the need to respond to climate change is more critical than ever. Against this background, many governments have increased efforts to promote deployment of renewable energy -- low-carbon sources that can strengthen energy security. This has stimulated unprecedented rise in deployment, and renewables are now the fastest growing sector of the energy mix. This 'coming of age' of renewable energy also brings challenges. Growth is focused on a few of the available technologies, and rapid deployment is confined to a relatively small number of countries. In more advanced markets, managing support costs and system integration of large shares of renewable energy in a time of economic weakness and budget austerity has sparked vigorous political debate. The IEA's new report, Deploying Renewables 2011: Best and Future Policy Practice: - Provides a comprehensive review and analysis of renewable energy policy and market trends; - Analyses in detail the dynamics of deployment and provides best-practice policy principles for different stages of market maturity; - Assesses the impact and cost-effectiveness of support policies using new methodological tools and indicators; - Investigates the strategic reasons underpinning the pursuit of RE deployment by different countries and the prospects for globalisation of RE. This new book builds on and extends a 2008 IEA publication, drawing on recent policy and deployment experience world-wide. It provides guidance for policy makers and other stakeholders to avoid past mistakes, overcome new challenges and reap the benefits of deploying renewables -- today and tomorrow.

  4. Modeling EERE Deployment Programs

    Energy Technology Data Exchange (ETDEWEB)

    Cort, Katherine A.; Hostick, Donna J.; Belzer, David B.; Livingston, Olga V.

    2007-11-08

    The purpose of this report is to compile information and conclusions gathered as part of three separate tasks undertaken as part of the overall project, “Modeling EERE Deployment Programs,” sponsored by the Planning, Analysis, and Evaluation office within the Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE). The purpose of the project was to identify and characterize the modeling of deployment programs within the EERE Technology Development (TD) programs, address improvements to modeling in the near term, and note gaps in knowledge where future research is needed.

  5. Remote Systems Design & Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, Sharon A.; Baker, Carl P.; Valdez, Patrick LJ

    2009-08-28

    The Pacific Northwest National Laboratory (PNNL) was tasked by Washington River Protection Solutions, LLC (WRPS) to provide information and lessons learned relating to the design, development and deployment of remote systems, particularly remote arm/manipulator systems. This report reflects PNNL’s experience with remote systems and lays out the most important activities that need to be completed to successfully design, build, deploy and operate remote systems in radioactive and chemically contaminated environments. It also contains lessons learned from PNNL’s work experiences, and the work of others in the national laboratory complex.

  6. Deployment Health Surveillance

    National Research Council Canada - National Science Library

    DeNicola, Anthony D

    2004-01-01

    ... of stress in causing chronic illness. The lack of comprehensive deployment health surveillance has made it difficult to determine possible causes of adverse health effects reported by Gulf War veterans...

  7. Deployment-related risk factors of low back pain

    DEFF Research Database (Denmark)

    Nissen, Lars Ravnborg; Marott, Jacob Louis; Gyntelberg, Finn

    2014-01-01

    Where much is known about the consequences of spinal and low back pain (LBP) during military deployments, there is lesser knowledge of risk factors for LBP among the deployed forces. The objective of this study was to identify deployment-related exposures associated with LBP. The study was a ques...... their subordinates and involve medical personnel, especially deployed physiotherapists, by giving advice to soldiers of different military occupational specialties on how to optimize ergonomics at work....

  8. Family Reintegration Following Guard Deployment

    Science.gov (United States)

    2010-09-20

    Somalia Peacekeepers. Journal of Consulting and Clinical Psychology, 72(5), 909-913. Haas DM . Pazdernik LA. Olsen CH. A cross-sectional survey of the...relationship between partner deployment and stress in pregnancy during wartime. Haas DM . Pazdernik LA. Partner deployment and stress in pregnant...Identify 3-5 key words relating to the proposal. (Required) I used MESH Headings instead of the CRISP Thesaurus for key

  9. Heterogeneous Deployment Analysis for Cost-Effective Mobile Network Evolution

    DEFF Research Database (Denmark)

    Coletti, Claudio

    2013-01-01

    network coverage and boosting network capacity in traffic hot-spot areas. The thesis deals with the deployment of both outdoor small cells and indoor femto cells. Amongst the outdoor solution, particular emphasis is put on relay base stations as backhaul costs can be reduced by utilizing LTE spectrum...... statistical models of deployment areas, the performance analysis is carried out in the form of operator case studies for large-scale deployment scenarios, including realistic macro network layouts and inhomogeneous spatial traffic distributions. Deployment of small cells is performed by means of proposed...... heuristic deployment algorithms, which combine network coverage and spatial user density information. As a secondary aspect, deployment solutions achieving the same coverage performance are compared in terms of Total Cost of Ownership (TCO), in order to investigate the viability of different deployment...

  10. Home front: post-deployment mental health and divorces.

    Science.gov (United States)

    Negrusa, Brighita; Negrusa, Sebastian

    2014-06-01

    Since 2003, about 14 % of U.S. Army soldiers have reported symptoms of posttraumatic stress disorder (PTSD) following deployments. In this article, we examine how post-deployment symptoms of PTSD and of other mental health conditions are related to the probability of divorce among married active-duty U.S. Army soldiers. For this purpose, we combine Army administrative individual-level longitudinal data on soldiers' deployments, marital history, and sociodemographic characteristics with their self-reported post-deployment health information. Our estimates indicate that time spent in deployment increases the divorce risk among Army enlisted personnel and that PTSD symptoms are associated with further increases in the odds of divorce. Although officers are generally less likely to screen positive for PTSD than enlisted personnel, we find a stronger relationship between PTSD symptoms and divorces among Army officers who are PTSD-symptomatic than among enlisted personnel. We estimate a larger impact of deployments on the divorce risk among female soldiers, but we do not find a differential impact of PTSD symptoms by gender. Also, we find that most of the effect of PTSD symptoms occurs early in the career of soldiers who deploy multiple times.

  11. Do soldiers seek more mental health care after deployment? Analysis of mental health consultations in the Netherlands Armed Forces following deployment to Afghanistan

    Directory of Open Access Journals (Sweden)

    Elisabeth (Liesbeth M. Taal

    2014-08-01

    Full Text Available Background: Military deployment to combat zones puts military personnel to a number of physical and mental challenges that may adversely affect mental health. Until now, few studies have been performed in Europe on mental health utilization after military deployment. Objective: We compared the incidence of mental health consultations with the Military Mental Health Service (MMHS of military deployed to Afghanistan to that of non-deployed military personnel. Method: We assessed utilization of the MMHS by the full cohort of the Netherlands Armed Forces enlisted between 2008 and 2010 through linkage of mental health and human resource information systems. Results: The total population consisted of 50,508 military (18,233 deployed, 32,275 non-deployed, who accounted for 1,906 new consultations with the MMHS. The follow-up was limited to the first 2 years following deployment. We observed higher mental health care utilization in deployed vs. non-deployed military personnel; hazard ratio (HR, adjusted for sex, military branch and time in service, 1.84 [95% CI 1.61–2.11] in the first and 1.28 [1.09–1.49] in the second year after deployment. An increased risk of adjustment disorders (HR 2.59 [2.02–3.32] and 1.74 [1.30–2.32] and of anxiety disorders (2.22 [1.52–3.25] and 2.28 [1.50–3.45] including posttraumatic stress disorder (5.15 [2.55–10.40] and 5.28 [2.42–11.50], but not of mood disorders (1.33 [0.90–1.97] and 1.11 [0.68–1.82], was observed in deployed personnel in the first- and second-year post-deployment, respectively. Military personnel deployed in a unit with a higher risk of confrontation with potentially traumatic events had a higher HR (2.13 [1.84–2.47] and 1.40 [1.18–1.67]. Conclusions: Though absolute risk was low, in the first and second year following deployment to Afghanistan there was an 80 and 30% higher risk for mental health problems resulting in a consultation with the Dutch MMHS compared to military never

  12. Do soldiers seek more mental health care after deployment? Analysis of mental health consultations in the Netherlands Armed Forces following deployment to Afghanistan

    Science.gov (United States)

    Taal, Elisabeth (Liesbeth) M.; Vermetten, Eric; van Schaik, Digna (Anneke) J. F.; Leenstra, Tjalling

    2014-01-01

    Background Military deployment to combat zones puts military personnel to a number of physical and mental challenges that may adversely affect mental health. Until now, few studies have been performed in Europe on mental health utilization after military deployment. Objective We compared the incidence of mental health consultations with the Military Mental Health Service (MMHS) of military deployed to Afghanistan to that of non-deployed military personnel. Method We assessed utilization of the MMHS by the full cohort of the Netherlands Armed Forces enlisted between 2008 and 2010 through linkage of mental health and human resource information systems. Results The total population consisted of 50,508 military (18,233 deployed, 32,275 non-deployed), who accounted for 1,906 new consultations with the MMHS. The follow-up was limited to the first 2 years following deployment. We observed higher mental health care utilization in deployed vs. non-deployed military personnel; hazard ratio (HR), adjusted for sex, military branch and time in service, 1.84 [95% CI 1.61–2.11] in the first and 1.28 [1.09–1.49] in the second year after deployment. An increased risk of adjustment disorders (HR 2.59 [2.02–3.32] and 1.74 [1.30–2.32]) and of anxiety disorders (2.22 [1.52–3.25] and 2.28 [1.50–3.45]) including posttraumatic stress disorder (5.15 [2.55–10.40] and 5.28 [2.42–11.50]), but not of mood disorders (1.33 [0.90–1.97] and 1.11 [0.68–1.82]), was observed in deployed personnel in the first- and second-year post-deployment, respectively. Military personnel deployed in a unit with a higher risk of confrontation with potentially traumatic events had a higher HR (2.13 [1.84–2.47] and 1.40 [1.18–1.67]). Conclusions Though absolute risk was low, in the first and second year following deployment to Afghanistan there was an 80 and 30% higher risk for mental health problems resulting in a consultation with the Dutch MMHS compared to military never deployed to

  13. Supporting deployed operations: are military nurses gaining the relevant experience from MDHUs to be competent in deployed operations?

    Science.gov (United States)

    Beaumont, Steven P; Allan, Helen T

    2014-01-01

    To explore how peacetime employment of military nurses in the UK National Health Service Medical Defence Hospital Units prepares them to be competent to practise in their role on deployment. Military secondary care nurses are employed within UK National Health Service Trusts to gain clinical experience that will be relevant to their military nursing role. A two-stage grounded theory study using mixed methods: postal questionnaire survey and in-depth interviews. In stage one a postal questionnaire was distributed to all serving military nurses. Stage two involved 12 semi-structured interviews. The data from both parts of the study were analysed using grounded theory. Four categories and one core category were identified, which suggested that participants did not feel fully prepared for deployment. Their feelings of preparedness increased with deployment experience and decreased when the nature of injuries seen on deployment changed. Respondents argued that even when unprepared, they did not feel incompetent. The findings suggest that the peacetime clinical experience gained in the National Health Service did not always develop the necessary competencies to carry out roles as military nurses on deployment. This study highlights the unique role of military nurses. We discuss these findings in the light of the literature on competency and expertise. The military nurses in this study did not feel fully prepared for deployed operations. We propose a new model for how military nurses could gain relevant experience from their National Health Service placements. National Health Service clinical placements need to be reassessed regularly to ensure that they are meeting military nurses' clinical requirements. Experiences of nurses returning from deployment could be shared and used as a basis for reflection and learning within National Health Service Trusts and also inform decisions regarding the appropriateness of clinical placements for qualified military nurses. © 2012

  14. Rupture of the pectoralis major muscle in a paratrooper.

    Science.gov (United States)

    Komurcu, Mahmut; Yildiz, Yavuz; Ozdemir, M Taner; Erler, Kaan

    2004-01-01

    Rupture of the pectoralis major muscle is a very rare injury. Excessive contraction of muscle fibers during certain forms of sports, such as weightlifting and bench pressing, is the most common cause. Among the 150 reported cases in the literature, in only 1 case did the injury happen during the landing phase of parachuting. Here we report a case of pectoralis major muscle rupture caused by a different mechanism than published previously. A paratrooper was injured during a tactical jump out of an aircraft after becoming entangled with the risers. The mechanism of injury was excessive traction and malpositioning of his shoulder when the parachute deployed. A three-phase conservative treatment regimen was performed and results were assessed by dynamometry. The patient was satisfied with the treatment and the dynamometric results were good at 9 mo after injury and at the end of a 20-mo follow-up period. We suggest that three-phase rehabilitation can be an effective treatment option for pectoralis major muscle rupture in selected patients. Prevention of this type of altitude injury would be possible by applying the fundamentals of parachuting.

  15. Reintegration Difficulty of Military Couples Following Deployment

    Science.gov (United States)

    2016-07-01

    Response rate for Wave 8 = 88% Our final sample contained 554 men and 556 women (n = 554 cross- sex couples, 1 same- sex couple). Individuals were...story in the Killeen Daily Herald (10 April 2016) http://kdhnews.com/news/local/ kids -deployments-when-a-parent-deploys-children-face- tough...years old), and (c) “Me getting sick and having to go to sick call.” (deployed Army husband, 25 years old). Sex and fidelity. Comments fell into

  16. Market and Policy Barriers to Energy Storage Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Bhatnagar, Dhruv [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Currier, Aileen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hernandez, Jacquelynne [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ma, Ookie [Dept. of Energy (DOE), Washington DC (United States) Office of Energy Efficiency and Renewable Energy; Kirby, Brendan [Consultant

    2013-09-01

    Electric energy storage technologies can provide numerous grid services; there are a number of factors that restrict their current deployment. The most significant barrier to deployment is high capital costs, though several recent deployments indicate that capital costs are decreasing and energy storage may be the preferred economic alternative in certain situations. However, a number of other market and regulatory barriers persist, limiting further deployment. These barriers can be categorized into regulatory barriers, market (economic) barriers, utility and developer business model barriers, cross-cutting barriers and technology barriers.

  17. Unocal Parachute Creek Shale Oil Program. Environmental Monitoring Plan quarterly report. Fourth quarter, 1989. Rept. for 1 Oct-31 Dec 89

    International Nuclear Information System (INIS)

    1990-01-01

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commerical-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The Program agreed to comply with existing environmental monitoring regulations and to develop an Environmental Monitoring Plan incorporating supplemental monitoring in the areas of water, air, solid waste, and worker health and safety during the period 1985-1992. These activities are described in a series of quarterly and annual reports. The report contains environmental compliance data reports, results of industrial hygiene compliance monitoring, and independent audits. Table 2-1 shows 14 of the 20 supplemental monitoring sites sampled during the quarter

  18. A Remotely Deployable Wind Sonic Anemometer

    Directory of Open Access Journals (Sweden)

    Muhammad Awais

    2017-12-01

    Full Text Available Communication and computing shape up base for explosion of Internet of Things (IoT era. Humans can efficiently control the devices around their environment as per requirements because of IoT, the communication between different devices brings more flexibility in surrounding. Useful data is also gathered from some of these devices to create Big Data; where, further analysis assist in making life easier by developing good business models corresponding to user needs, enhance scientific research, formulating weather prediction or monitoring systems and contributing in other relative fields as well. Thus, in this research a remotely deployable IoT enabled Wind Sonic Anemometer has been designed and deployed to calculate average wind speed, direction, and gust. The proposed design is remotely deployable, user-friendly, power efficient and cost-effective because of opted modules i.e., ultrasonic sensors, GSM module, and solar panel. The testbed was also deployed at the roof of Computer & Information Systems Engineering (CIS department, NED UET. Further, its calibration has been carried out by using long short-term memory (LSTM, a deep learning technique; where ground truth data has been gathered from mechanical wind speed sensor (NRG-40 H deployed at top of Industrial & Manufacturing (IM department of NED UET. The obtained results are satisfactory and the performance of designed sensor is also good under various weather conditions.

  19. Environmental issues affecting clean coal technology deployment

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.J. [Electric Power Research Inst., Palo Alto, CA (United States)

    1997-12-31

    The author outlines what he considers to be the key environmental issues affecting Clean Coal Technology (CCT) deployment both in the US and internationally. Since the international issues are difficult to characterize given different environmental drivers in various countries and regions, the primary focus of his remarks is on US deployment. However, he makes some general remarks, particularly regarding the environmental issues in developing vs. developed countries and how these issues may affect CCT deployment. Further, how environment affects deployment depends on which particular type of clean coal technology one is addressing. It is not the author`s intention to mention many specific technologies other than to use them for the purposes of example. He generally categorizes CCTs into four groups since environment is likely to affect deployment for each category somewhat differently. These four categories are: Precombustion technologies such as coal cleaning; Combustion technologies such as low NOx burners; Postcombustion technologies such as FGD systems and postcombustion NOx control; and New generation technologies such as gasification and fluidized bed combustion.

  20. An innovative deployable solar panel system for Cubesats

    Science.gov (United States)

    Santoni, Fabio; Piergentili, Fabrizio; Donati, Serena; Perelli, Massimo; Negri, Andrea; Marino, Michele

    2014-02-01

    One of the main Cubesat bus limitations is the available on-board power. The maximum power obtained using body mounted solar panels and advanced triple junction solar cells on a triple unit Cubesat is typically less than 10 W. The Cubesat performance and the mission scenario opened to these small satellite systems could be greatly enhanced by an increase of the available power. This paper describes the design and realization of a modular deployable solar panel system for Cubesats, consisting of a modular hinge and spring system that can be potentially used on-board single (1U), double(2U), triple (3U) and six units (6U) Cubesats. The size of each solar panels is the size of a lateral Cubesat surface. The system developed is the basis for a SADA (Solar Array Drive Assembly), in which a maneuvering capability is added to the deployed solar array in order to follow the apparent motion of the sun. The system design trade-off is discussed, comparing different deployment concepts and architectures, leading to the final selection for the modular design. A prototype of the system has been realized for a 3U Cubesat, consisting of two deployable solar panel systems, made of three solar panels each, for a total of six deployed solar panels. The deployment system is based on a plastic fiber wire and thermal cutters, guaranteeing a suitable level of reliability. A test-bed for the solar panel deployment testing has been developed, supporting the solar array during deployment reproducing the dynamical situation in orbit. The results of the deployment system testing are discussed, including the design and realization of the test-bed, the mechanical stress given to the solar cells by the deployment accelerations and the overall system performance. The maximum power delivered by the system is about 50.4 W BOL, greatly enhancing the present Cubesat solar array performance.

  1. Testing the Deployment Repeatability of a Precision Deployable Boom Prototype for the Proposed SWOT Karin Instrument

    Science.gov (United States)

    Agnes, Gregory S.; Waldman, Jeff; Hughes, Richard; Peterson, Lee D.

    2015-01-01

    NASA's proposed Surface Water Ocean Topography (SWOT) mission, scheduled to launch in 2020, would provide critical information about Earth's oceans, ocean circulation, fresh water storage, and river discharge. The mission concept calls for a dual-antenna Ka-band radar interferometer instrument, known as KaRIn, that would map the height of water globally along two 50 km wide swaths. The KaRIn antennas, which would be separated by 10 meters on either side of the spacecraft, would need to be precisely deployable in order to meet demanding pointing requirements. Consequently, an effort was undertaken to design build and prototype a precision deployable Mast for the KaRIn instrument. Each mast was 4.5-m long with a required dilitation stability of 2.5 microns over 3 minutes. It required a minimum first mode of 7 Hz. Deployment repeatability was less than +/- 7 arcsec in all three rotation directions. Overall mass could not exceed 41.5 Kg including any actuators and thermal blanketing. This set of requirements meant the boom had to be three times lighter and two orders of magnitude more precise than the existing state of the art for deployable booms.

  2. Review of deployment technology for tethered satellite systems

    Science.gov (United States)

    Yu, B. S.; Wen, H.; Jin, D. P.

    2018-03-01

    Tethered satellite systems (TSSs) have attracted significant attention due to their potential and valuable applications for scientific research. With the development of various launched on-orbit missions, the deployment of tethers is considered a crucial technology for operation of a TSS. Both past orbiting experiments and numerical results have shown that oscillations of the deployed tether due to the Coriolis force and environmental perturbations are inevitable and that the impact between the space tether and end-body at the end of the deployment process leads to complicated nonlinear phenomena. Hence, a set of suitable control methods plays a fundamental role in tether deployment. This review article summarizes previous work on aspects of the dynamics, control, and ground-based experiments of tether deployment. The relevant basic principles, analytical expressions, simulation cases, and experimental results are presented as well.

  3. An Annotated Bibliography of MANPRINT-Related Assessments and Evaluations Conducted by the U.S. Army, 2nd Edition: 1953 to 2009. Volume 2 - MANPRINT Assessment and Evaluations

    Science.gov (United States)

    2010-02-01

    capability to detect low metallic AT and AP mines, an improved capability to detect mines in soils with high electrical conductivity, and a capability...deliver the paratrooper to the ground during airborne operations. The main parachute consists of a Universal Static Line ( USL ), deployment bag, pilot...fragmentation protection by supporting a soil cover of approximately 18 inches. SFCs will be dropped off at unit locations within the theater of

  4. Differential Child Maltreatment Risk Across Deployment Periods of US Army Soldiers.

    Science.gov (United States)

    Taylor, Christine M; Ross, Michelle E; Wood, Joanne N; Griffis, Heather M; Harb, Gerlinde C; Mi, Lanyu; Song, Lihai; Strane, Douglas; Lynch, Kevin G; Rubin, David M

    2016-01-01

    We described the risk for maltreatment among toddlers of US Army soldiers over different deployment cycles to develop a systematic response within the US Army to provide families appropriate supports. We conducted a person-time analysis of substantiated maltreatment reports and medical diagnoses among children of 112,325 deployed US Army soldiers between 2001 and 2007. Risk of maltreatment was elevated after deployment for children of soldiers deployed once but not for children of soldiers deployed twice. During the 6 months after deployment, children of soldiers deployed once had 4.43 substantiated maltreatment reports and 4.96 medical diagnoses per 10,000 child-months. The highest maltreatment rate among children of soldiers deployed twice occurred during the second deployment for substantiated maltreatment (4.83 episodes per 10,000 child-months) and before the first deployment for medical diagnoses of maltreatment (3.78 episodes per 10,000 child-months). We confirmed an elevated risk for child maltreatment during deployment but also found a previously unidentified high-risk period during the 6 months following deployment, indicating elevated stress within families of deployed and returning soldiers. These findings can inform efforts by the military to initiate and standardize support and preparation to families during periods of elevated risk.

  5. Deployable structures for a human lunar base

    Science.gov (United States)

    Gruber, Petra; Häuplik, Sandra; Imhof, Barbara; Özdemir, Kürsad; Waclavicek, Rene; Perino, Maria Antoinetta

    2007-06-01

    The study Lunar exploration architecture—deployable structures for a lunar base was performed within the Alcatel Alenia Space “Lunar Exploration Architecture” study for the European Space Agency. The purpose of the study was to investigate bionic concepts applicable to deployable structures and to interpret the findings for possible implementation concepts. The study aimed at finding innovative solutions for deployment possibilities. Translating folding/unfolding principles from nature, candidate geometries were developed and researched using models, drawings and visualisations. The use of materials, joints between structural elements and construction details were investigated for these conceptual approaches. Reference scenarios were used to identify the technical and environmental conditions, which served as design drivers. Mechanical issues and the investigation of deployment processes narrowed the selection down to six chosen concepts. Their applicability was evaluated at a conceptual stage in relation to the timescale of the mission.

  6. Psychiatric Effects of Military Deployment on Children and Families

    Science.gov (United States)

    James, Trenton

    2012-01-01

    Deployments in the United States military have increased greatly in the past 10 years. Families and children are psychiatrically affected by these deployments, and recent studies are clarifying these effects. This article focuses on the psychiatric effects of deployment on children and uses a composite case example to review the use of play therapy to treat children who are having psychiatric issues related to the deployment of one or both parents. PMID:22468239

  7. Design aspects of a deployable tensegrity-hollow-rope footbridge

    OpenAIRE

    Rhode-Barbarigos , Landolf; Bel Hadj Ali , Nizar; Motro , René; Smith , Ian F.C.

    2012-01-01

    International audience; Tensegrity structures are composed of cables and struts in a pre-stressed self-equilibrium. Although tensegrity first appeared in the 1950s, it is seldom used in civil engineering. This paper focuses on the design aspects of a deployable tensegrity-hollow-rope footbridge. Deployment is usually not a critical design case for traditional deployable structures. However, for tensegrity systems deployment may be critical due to the actuation required. In this paper, deploym...

  8. Shape memory alloy fracture as a deployment actuator

    International Nuclear Information System (INIS)

    Buban, Darrick M; Frantziskonis, George N

    2013-01-01

    The paper reports an experimental investigation into using shape memory alloy (SMA) as a deployment actuator. SMA specimens were heated and pulled to failure or pulled and heated to failure, thus developing an environmental and structural operating envelope for application as deployment mechanisms. The experimental results strongly suggest that SMAs can be implemented as deployment actuators. Recorded data shows that SMA fracture is possible over a wide range of temperatures and strains, filling a material performance gap not found in the literature. The obtained information allows design engineers to appropriately size SMAs given the design requirements for achieving the desired deployment effects. The major conclusion of the reported work is that SMAs as actuators are strong competitors to typical existing deployment efforts that use explosive or non-explosive actuators having implementation drawbacks such as the expense associated with special handling and the volume encountered in mounting the devices. (paper)

  9. Garden State Parkway Corridor : ITS early deployment planning study : strategic deployment plan

    Science.gov (United States)

    1997-12-01

    This Strategic Deployment Plan describes ways of improving travel within the Garden : State Parkway Corridor using intelligent transportation systems (ITS) and without : constructing additional roadway lanes. Travel improvements will be possible with...

  10. Deployment Instabilities of Lobed-Pumpkin Balloon

    Science.gov (United States)

    Nakashino, Kyoichi

    A lobed-pumpkin balloon, currently being developed in ISAS/JAXA as well as in NASA, is a promising vehicle for long duration scientific observations in the stratosphere. Recent ground and flight experiments, however, have revealed that the balloon has deployment instabilities under certain conditions. In order to overcome the instability problems, a next generation SPB called 'tawara' type balloon has been proposed, in which an additional cylindrical part is appended to the standard lobed-pumpkin balloon. The present study investigates the deployment stability of tawara type SPB in comparison to that of standard lobed-pumpkin SPB through eigenvalue analysis on the basis of finite element methods. Our numerical results show that tawara type SPB enjoys excellent deployment performance over the standard lobed-pumpkin SPBs.

  11. Large Deployable Reflector (LDR)

    Science.gov (United States)

    Alff, W. H.

    1980-01-01

    The feasibility and costs were determined for a 1 m to 30 m diameter ambient temperature, infrared to submillimeter orbiting astronomical telescope which is to be shuttle-deployed, free-flying, and have a 10 year orbital life. Baseline concepts, constraints on delivery and deployment, and the sunshield required are examined. Reflector concepts, the optical configuration, alignment and pointing, and materials are also discussed. Technology studies show that a 10 m to 30 m diameter system which is background and diffraction limited at 30 micron m is feasible within the stated time frame. A 10 m system is feasible with current mirror technology, while a 30 m system requires technology still in development.

  12. Cooperative Technolgy Deployed

    NARCIS (Netherlands)

    Koenders, E.; Velt, R. in 't

    2011-01-01

    After the successful demonstrations of cooperative technology by the CVIS and Safespot projects the question remains how this technology can be successfully deployed. This question is explored by the Field Operational Test project FREILOT, which aims to provide fuel economy applications that must be

  13. Swarm Deployable Boom Assembly (DBA) Development of a Deployable Magnetometer Boom for the Swarm Spacecraft

    Science.gov (United States)

    McMahon, Paul; Jung, Hans-Juergen; Edwards, Jeff

    2013-09-01

    The Swarm programme consists of 3 magnetically clean satellites flying in close formation designed to measure the Earth's magnetic field using 2 Magnetometers mounted on a 4.3m long deployable boom.Deployment is initiated by releasing 3 HDRMs, once released the boom oscillates back and forth on a pair of pivots, similar to a restaurant kitchen door hinge, for around 120 seconds before coming to rest on 3 kinematic mounts which are used to provide an accurate reference location in the deployed position. Motion of the boom is damped through a combination of friction, spring hysteresis and flexing of the 120+ cables crossing the hinge. Considerable development work and accurate numerical modelling of the hinge motion was required to predict performance across a wide temperature range and ensure that during the 1st overshoot the boom did not damage itself, the harness or the spacecraft.Due to the magnetic cleanliness requirements of the spacecraft no magnetic materials could be used in the design of the hardware.

  14. Center for Deployment Psychology

    Data.gov (United States)

    Federal Laboratory Consortium — The Center for Deployment Psychology was developed to promote the education of psychologists and other behavioral health specialists about issues pertaining to the...

  15. UNOCAL Parachute Creek Shale Oil Program. Environmental Monitoring Plan - supplemental environmental. Volume 1. Trip 2 report. Rept. for 1988-90

    International Nuclear Information System (INIS)

    1991-01-01

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The Program agreed to comply with existing environmental monitoring regulations and to develop an Environmental Monitoring Plan (EMP) incorporating supplemental monitoring in the areas of water, air, solid waste, and worker health and safety during the period 1985-1992. These activities are described in a series of quarterly and annual reports. The report contains results of three years of supplemental environmental sampling (Trial Trip, 1988; Trip 1, 1989; and Trip 2, 1990); Trip 2 sampling and analytical methods; quality assurance and quality control procedures; sampling and analytical methods; and corrected data from 1988 and 1989 gas and particulate concentrations

  16. Finding Their Way Back In: Family Reintegration Following Guard Deployment.

    Science.gov (United States)

    Messecar, Deborah C

    2017-03-01

    The aim of this study was to describe deployed National Guard members' and their families' perceptions of their experience with family reintegration, and the causes and conditions of challenges reintegration presents after deployment. A total of 26 National Guard members and 19 family members participated in individual (n = 22), couples (n = 6), or focus group (n = 17) interviews. In-depth interviews were used to assess needs and maximize input from military families regarding deployment-related experiences and reintegration issues. Qualitative coding and analysis of data were completed using NVivo. Finding their way back in is the key process that the military members must complete to successfully reestablish their desired social connections with the family and reclaim their place within the family. Several conditions shape the degree of challenges with reintegration that veterans and their family will encounter. These include preparation for deployment, length and type of deployment, communication during deployment, and finally, awareness of how deployment changes the military member and the family. Support resources dedicated to providing National Guard members and their families with assistance in preparing for deployments and educating them about the importance of communication during deployment should be maintained and expanded. Broader educational efforts that increase awareness of what to expect regarding how deployment changes the military member and the family are needed. Reprint & Copyright © 2017 Association of Military Surgeons of the U.S.

  17. Small cell networks deployment, management, and optimization

    CERN Document Server

    Claussen, Holger; Ho, Lester; Razavi, Rouzbeh; Kucera, Stepan

    2018-01-01

    Small Cell Networks: Deployment, Management, and Optimization addresses key problems of the cellular network evolution towards HetNets. It focuses on the latest developments in heterogeneous and small cell networks, as well as their deployment, operation, and maintenance. It also covers the full spectrum of the topic, from academic, research, and business to the practice of HetNets in a coherent manner. Additionally, it provides complete and practical guidelines to vendors and operators interested in deploying small cells. The first comprehensive book written by well-known researchers and engineers from Nokia Bell Labs, Small Cell Networks begins with an introduction to the subject--offering chapters on capacity scaling and key requirements of future networks. It then moves on to sections on coverage and capacity optimization, and interference management. From there, the book covers mobility management, energy efficiency, and small cell deployment, ending with a section devoted to future trends and applicat...

  18. RSOI: Force Deployment Bottleneck

    National Research Council Canada - National Science Library

    D'Amato, Mark

    1998-01-01

    This study uses The Theory Of Constraints (TOC) management methodology and recent military missions to show that RSOI operations are generally the limiting constraint to force deployment operations...

  19. Verification Test for Ultra-Light Deployment Mechanism for Sectioned Deployable Antenna Reflectors

    Science.gov (United States)

    Zajac, Kai; Schmidt, Tilo; Schiller, Marko; Seifart, Klaus; Schmalbach, Matthias; Scolamiero, Lucio

    2013-09-01

    The ultra-light deployment mechanism (UDM) is based on three carbon fibre reinforced plastics (CFRP) curved tape springs made of carbon fibre / cyanate ester prepregs.In the frame of the activity its space application suitability for the deployment of solid reflector antenna sections was investigated. A projected diameter of the full reflector of 4 m to 7 m and specific mass in the order of magnitude of 2.6kg/m2 was focused for requirement derivation.Extensive verification tests including health checks, environmental and functional tests were carried out with an engineering model to enable representative characterizing of the UDM unit.This paper presents the design and a technical description of the UDM as well as a summary of achieved development status with respect to test results and possible design improvements.

  20. Deployment Testing of the De-Orbit Sail Flight Hardware

    OpenAIRE

    Hillebrandt, Martin; Meyer, Sebastian; Zander, Martin; Hühne, Christian

    2015-01-01

    The paper describes the results of the deployment testing of the De-Orbit Sail flight hardware, a drag sail for de-orbiting applications, performed by DLR. It addresses in particular the deployment tests of the fullscale sail subsystem and deployment force tests performed on the boom deployment module. For the fullscale sail testing a gravity compensation device is used which is described in detail. It allows observations of the in-plane interaction of the booms with the sail membrane and the...

  1. IPv6 deployment and management

    CERN Document Server

    Dooley, Michael

    2013-01-01

    A guide for understanding, deploying, and managing Internet Protocol version 6 The growth of the Internet has created a need for more addresses than are available with Internet Protocol version 4 (IPv4)-the protocol currently used to direct almost all Internet traffic. Internet Protocol version 6 (IPv6)-the new IP version intended to ultimately succeed IPv4-will expand the addressing capacity of the Internet to support the explosive growth of users and devices on the Internet as well as add flexibility to allocating addresses and efficiency for routing traffic. IPv6 Deploy

  2. Deploying Node.js

    CERN Document Server

    Pasquali, Sandro

    2015-01-01

    If you are an intermediate or advanced developer deploying your Node.js applications, then this book is for you. If you have already built a Node application or module and want to take your knowledge to the next level, this book will help you find your way.

  3. Accounting for variation in wind deployment between Canadian provinces

    International Nuclear Information System (INIS)

    Ferguson-Martin, Christopher J.; Hill, Stephen D.

    2011-01-01

    Wind energy deployment varies widely across regions and this variation cannot be explained by differences in natural wind resources alone. Evidence suggests that institutional factors beyond physical wind resources can influence the deployment of wind energy systems. Building on the work of , this study takes a historical institutionalist approach to examine the main factors influencing wind energy deployment across four Canadian provinces Canada: Alberta, Manitoba, Ontario and Nova Scotia. Our case studies suggest that wind energy deployment depends upon a combination of indirect causal factors-landscape values, political and social movements, government electricity policy, provincial electricity market structure and incumbent generation technologies and direct causal factors-grid architecture, ownership patterns, renewable incentive programs, planning and approvals processes and stakeholder support and opposition. - Research highlights: → Examines the reasons for variations in wind deployment between Canadian provinces. → Employs a historical institutional approach to the analysis. → Discusses social factors that affect wind deployment across Canadian jurisdictions.

  4. Deployable reflector configurations

    Science.gov (United States)

    Meinel, A. B.; Meinel, M. P.; Woolf, N. J.

    Both the theoretical reasons for considering a non-circular format for the Large Deployable Reflector, and a potentially realizable concept for such a device, are discussed. The optimum systems for diffraction limited telescopes with incoherent detection have either a single filled aperture, or two such apertures as an interferometer to synthesize a larger aperture. For a single aperture of limited area, a reflector in the form of a slot can be used to give increased angular resolution. It is shown how a 20 x 8 meter telescope can be configured to fit the Space Shuttle bay, and deployed with relatively simple operations. The relationship between the sunshield design and the inclination of the orbit is discussed. The possible use of the LDR as a basic module to permit the construction of supergiant space telescopes and interferometers both for IR/submm studies and for the entire ultraviolet through mm wave spectral region is discussed.

  5. Simulating CubeSat Structure Deployment Dynamics, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — There is high value in simulating the nonlinear dynamics of stowing, deploying, and performance of deployable space structures, especially given the profound...

  6. The risk for marital infidelity across a year-long deployment.

    Science.gov (United States)

    Balderrama-Durbin, Christina; Stanton, Kimberley; Snyder, Douglas K; Cigrang, Jeffrey A; Talcott, G Wayne; Smith Slep, Amy M; Heyman, Richard E; Cassidy, Daniel G

    2017-08-01

    Military deployment can create significant relationship strain. Although most couples navigate the challenges of deployment successfully, this period may render some couples more vulnerable to adverse relationship outcomes such as infidelity due to a convergence of factors including geographic separation and reduced emotional and physical intimacy. Despite anecdotal reports of increased rates of infidelity during deployment, empirical findings are lacking. This study used a prospective design to examine the prevalence and risk factors of infidelity across the deployment cycle including a year-long deployment to Iraq. A total of 63 married male Airmen were assessed both pre- and 6-9 months postdeployment. The rate of sexual infidelity prior to deployment (21%) was commensurate with the lifetime rate of sexual involvement outside the marriage in representative community samples of men. Across the deployment period, the prevalence of sexual infidelity was strikingly high (22.6%) compared with annual community estimates (1.5-4%; Allen et al., 2005). Findings demonstrated that service members with a prior history of separation, steps toward divorce, and relationship distress prior to deployment had elevated risk for infidelity over the deployment cycle. Moreover, roughly 75% of Airmen who experienced infidelity over the deployment cycle divorced by 6-9 months postdeployment whereas only 5% of service members without infidelity divorced during this same time period. Considering well-documented adverse impacts of infidelity and divorce, the current findings may assist in identifying military couples at risk for infidelity and informing targeted prevention or early intervention strategies for these couples prior to or immediately following deployment. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  7. Multiobjective Shape Optimization for Deployment and Adjustment Properties of Cable-Net of Deployable Antenna

    Directory of Open Access Journals (Sweden)

    Guoqiang You

    2015-01-01

    Full Text Available Based on structural features of cable-net of deployable antenna, a multiobjective shape optimization method is proposed to help to engineer antenna’s cable-net structure that has better deployment and adjustment properties. In this method, the multiobjective optimum mathematical model is built with lower nodes’ locations of cable-net as variables, the average stress ratio of cable elements and strain energy as objectives, and surface precision and natural frequency of cable-net as constraints. Sequential quadratic programming method is used to solve this nonlinear mathematical model in conditions with different weighting coefficients, and the results show the validity and effectiveness of the proposed method and model.

  8. Deployment Repeatability

    Science.gov (United States)

    2016-08-31

    large cohort of trials to spot unusual cases. However, deployment repeatability is inherently a nonlinear phenomenon, which makes modeling difficult...and GEMS tip position were both tracked during ground testing by a laser target tracking system. Earlier SAILMAST testing in 2005 [8] used...recalls the strategy used by SRTM, where a constellation of lights was installed at the tip of the boom and a modified star tracker was used to track tip

  9. Spacecraft-to-Earth Communications for Juno and Mars Science Laboratory Critical Events

    Science.gov (United States)

    Soriano, Melissa; Finley, Susan; Jongeling, Andre; Fort, David; Goodhart, Charles; Rogstad, David; Navarro, Robert

    2012-01-01

    Deep Space communications typically utilize closed loop receivers and Binary Phase Shift Keying (BPSK) or Quadrature Phase Shift Keying (QPSK). Critical spacecraft events include orbit insertion and entry, descent, and landing.---Low gain antennas--> low signal -to-noise-ratio.---High dynamics such as parachute deployment or spin --> Doppler shift. During critical events, open loop receivers and Multiple Frequency Shift Keying (MFSK) used. Entry, Descent, Landing (EDL) Data Analysis (EDA) system detects tones in real-time.

  10. Experiences and career intentions of combat-deployed UK military personnel.

    Science.gov (United States)

    Morris-Butler, R; Jones, N; Greenberg, N; Campion, B; Wessely, S

    2018-05-17

    Most studies of the psychological impact of military deployment focus on the negative and traumatic aspects. Less is known about the full range of deployment experiences nor how these may impact on career intentions. To examine subjective operational experiences and career intentions in deployed UK military personnel using data gathered toward the end of an operational deployment. Data were gathered during deployment in Iraq and Afghanistan. A self-report survey collected data on sociodemographic, operational and military factors. Respondents provided their strength of agreement or disagreement with six potentially positive deployment experiences and their endorsement or rejection of six possible career intentions. Two mental health measures assessed symptoms of common mental disorder and post-traumatic stress disorder. Responses were 681 in Iran 2009 (100% response rate); 1421 in Afghanistan in 2010 (100%), 1362 in 2011 (96%) and 860 in 2015 (91%). Five of the potentially positive outcomes were endorsed by >50% of the sample: confidence about remaining healthy after returning home, pride in accomplishments, increased confidence in abilities, improved unit cohesion and experiencing a positive life effect. Ninety per cent of respondents planned to continue in service after returning home. Fewer positive deployment experiences, poorer mental health, lesser unit cohesion and more negative impressions of leadership were significantly associated with intention to leave service. Contrary to the popular belief that UK military personnel deployed to Iraq or Afghanistan experience negative outcomes, this paper shows that deployment can be a positive experience for a substantial majority of deployed personnel.

  11. Applications of Dynamic Deployment of Services in Industrial Automation

    Science.gov (United States)

    Candido, Gonçalo; Barata, José; Jammes, François; Colombo, Armando W.

    Service-oriented Architecture (SOA) is becoming a de facto paradigm for business and enterprise integration. SOA is expanding into several domains of application envisioning a unified solution suitable across all different layers of an enterprise infrastructure. The application of SOA based on open web standards can significantly enhance the interoperability and openness of those devices. By embedding a dynamical deployment service even into small field de- vices, it would be either possible to allow machine builders to place built- in services and still allow the integrator to deploy on-the-run the services that best fit his current application. This approach allows the developer to keep his own preferred development language, but still deliver a SOA- compliant application. A dynamic deployment service is envisaged as a fundamental framework to support more complex applications, reducing deployment delays, while increasing overall system agility. As use-case scenario, a dynamic deployment service was implemented over DPWS and WS-Management specifications allowing designing and programming an automation application using IEC61131 languages, and deploying these components as web services into devices.

  12. Using Deduplicating Storage for Efficient Disk Image Deployment

    Directory of Open Access Journals (Sweden)

    Xing Lin

    2015-08-01

    Full Text Available Many clouds and network testbeds use disk images to initialize local storage on their compute devices. Large facilities must manage thousands or more images, requiring significant amounts of storage. At the same time, to provide a good user experience, they must be able to deploy those images quickly. Driven by our experience in operating the Emulab site at the University of Utah---a long-lived and heavily-used testbed---we have created a new service for efficiently storing and deploying disk images. This service exploits the redundant data found in similar images, using deduplication to greatly reduce the amount of physical storage required. In addition to space savings, our system is also designed for highly efficient image deployment---it integrates with an existing highly-optimized disk image deployment system, Frisbee, without significantly increasing the time required to distribute and install images. In this paper, we explain the design of our system and discuss the trade-offs we made to strike a balance between efficient storage and fast disk image deployment. We also propose a new chunking algorithm, called AFC, which enables fixed-size chunking for deduplicating allocated disk sectors. Experimental results show that our system reduces storage requirements by up to 3x while imposing only a negligible runtime overhead on the end-to-end disk-deployment process.

  13. Autonomous Deployment and Restoration of Sensor Network using Mobile Robots

    Directory of Open Access Journals (Sweden)

    Tsuyoshi Suzuki

    2010-09-01

    Full Text Available This paper describes an autonomous deployment and restoration of a Wireless Sensor Network (WSN using mobile robots. The authors have been developing an information-gathering system using mobile robots and WSNs in underground spaces in post-disaster environments. In our system, mobile robots carry wireless sensor nodes (SN and deploy them into the environment while measuring Received Signal Strength Indication (RSSI values to ensure communication, thereby enabling the WSN to be deployed and restored autonomously. If the WSN is disrupted, mobile robots restore the communication route by deploying additional or alternate SNs to suitable positions. Utilizing the proposed method, a mobile robot can deploy a WSN and gather environmental information via the WSN. Experimental results using a verification system equipped with a SN deployment and retrieval mechanism are presented.

  14. Autonomous Deployment and Restoration of Sensor Network using Mobile Robots

    Directory of Open Access Journals (Sweden)

    Tsuyoshi Suzuki

    2010-06-01

    Full Text Available This paper describes an autonomous deployment and restoration of a Wireless Sensor Network (WSN using mobile robots. The authors have been developing an information-gathering system using mobile robots and WSNs in underground spaces in post-disaster environments. In our system, mobile robots carry wireless sensor nodes (SN and deploy them into the environment while measuring Received Signal Strength Indication (RSSI values to ensure communication, thereby enabling the WSN to be deployed and restored autonomously. If the WSN is disrupted, mobile robots restore the communication route by deploying additional or alternate SNs to suitable positions. Utilizing the proposed method, a mobile robot can deploy a WSN and gather environmental information via the WSN. Experimental results using a verification system equipped with a SN deployment and retrieval mechanism are presented.

  15. Fundamentals of 3D Deployable Mechanisms in Space

    Data.gov (United States)

    National Aeronautics and Space Administration — Fundamentals of 3D Deployable Origami Structures in Space The primary objectives of my research are to study the application of 3D deployable origami structures in...

  16. Medical support to military airborne training and operations.

    Science.gov (United States)

    Starkey, Kerry J; Lyon, J; Sigman, E; Pynn, H J; Nordmann, G

    2018-05-01

    Airborne operations enable large numbers of military forces to deploy on the ground in the shortest possible time. This however must be balanced by an increased risk of injury. The aim of this paper is to review the current UK military drop zone medical estimate process, which may help to predict the risk of potential injury and assist in planning appropriate levels of medical support. In spring 2015, a British Airborne Battlegroup (UKBG) deployed on a 7-week overseas interoperability training exercise in the USA with their American counterparts (USBG). This culminated in a 7-day Combined Joint Operations Access Exercise, which began with an airborne Joint Forcible Entry (JFE) of approximately 2100 paratroopers.The predicted number of jump-related injuries was estimated using Parachute Order Number 8 (PO No 8). Such injuries were defined as injuries occurring from the time the paratrooper exited the aircraft until they released their parachute harness on the ground. Overall, a total of 53 (2.5%) casualties occurred in the JFE phase of the exercise, lower than the predicted number of 168 (8%) using the PO No 8 tool. There was a higher incidence of back (30% actual vs 20% estimated) and head injuries (21% actual vs 5% estimated) than predicted with PO No 8. The current method for predicting the incidence of medical injuries after a parachute drop using the PO No 8 tool is potentially not accurate enough for current requirements. Further research into injury rate, influencing factors and injury type are urgently required in order to provide an evidence base to ensure optimal medical logistical and clinical planning for airborne training and operations in the future. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  17. Deploying HEP applications using Xen and Globus Virtual Workspaces

    International Nuclear Information System (INIS)

    Agarwal, A; Desmarais, R; Gable, I; Grundy, D; P-Brown, D; Seuster, R; Vanderster, D C; Sobie, R; Charbonneau, A; Enge, R

    2008-01-01

    The deployment of HEP applications in heterogeneous grid environments can be challenging because many of the applications are dependent on specific OS versions and have a large number of complex software dependencies. Virtual machine monitors such as Xen could be used to package HEP applications, complete with their execution environments, to run on resources that do not meet their operating system requirements. Our previous work has shown HEP applications running within Xen suffer little or no performance penalty as a result of virtualization. However, a practical strategy is required for remotely deploying, booting, and controlling virtual machines on a remote cluster. One tool that promises to overcome the deployment hurdles using standard grid technology is the Globus Virtual Workspaces project. We describe strategies for the deployment of Xen virtual machines using Globus Virtual Workspace middleware that simplify the deployment of HEP applications

  18. Design of the De-Orbit Sail Boom Deployment Unit

    Science.gov (United States)

    Meyer, Sebastian; Hillebrandt, Martin; Straubel, Marco; Huhne, Christian

    2014-06-01

    The design of the De-Orbit Sail boom deployment unit is strongly driven by volume constraints, which are given by the cubesat container. Four CFRP (carbon fiber reinforced polymer) booms [4] with a cross-sectional shape of a double-omega and a length of 3.6 m are reeled on one spool in the center of the unit. The deployment of the four booms are controlled by an electric motor, which acts on the boom spool. Due to the volume limitation caused by the dimensions of the cubesat deployer the deployment unit has little room for the mechanisms components. With the aim to achieve a robust design, the deployment concept of the unit has greatly changed during the development process. The history of the design as well as the mechanisms are described. Additionally the results of the flight model testing are presented.

  19. Perceived effect of deployment on families of UK military personnel.

    Science.gov (United States)

    Thandi, G; Greenberg, N; Fear, N T; Jones, N

    2017-10-01

    In the UK, little is known about the perceived effects of deployment, on military families, from military personnel in theatre. To investigate military personnel's perceptions of the impact of deployment on intimate relationships and children. Deployed service personnel who were in a relationship, and who had children, completed a survey while deployed on combat operations. Data were taken from four mental health surveys carried out in Iraq in 2009 and Afghanistan in 2010, 2011 and 2014. Among 4265 participants, after adjusting for military and social-demographic covariates, perceiving that deployment had a negative impact on intimate relationships and children was associated with psychological distress, and traumatic stress symptoms. Military personnel who reported being in danger of being injured or killed during deployment, were more likely to report a perceived negative effect of deployment on their intimate relationships. Reservists were less likely to report a perceived negative impact of deployment on their children compared with regulars. Military personnel who themselves planned to separate from their partner were more likely to report psychological distress, and stressors at home. Perceived insufficient support from the Ministry of Defence was associated with poor mental health, and holding a junior rank. Deployed UK military personnel with symptoms of psychological distress, who experienced stressors at home, were especially likely to perceive that their family were inadequately supported by the military. Those planning to separate from their partner were at increased risk of suffering with mental health problems while deployed. © The Author 2017. Published by Oxford University Press on behalf of the Society of Occupational Medicine. All rights reserved. For Permissions, please email: journals.permissions@oup.com

  20. Deployment of Mobile Learning Course Materials to Android Powered Mobile Devices

    Science.gov (United States)

    Chao, Lee

    2012-01-01

    The objective of this article is to facilitate mobile teaching and learning by providing an alternative course material deployment method. This article suggests a course material deployment platform for small universities or individual instructors. Different from traditional course material deployment methods, the method discussed deploys course…

  1. The financial impact of deployments on reserve health care providers.

    Science.gov (United States)

    Petinaux, Bruno

    2008-08-01

    This study retrospectively surveyed the financial impact of deployments on 17 U.S. Army Reserve health care providers. Due to multiple mobilizations, 29 separate deployments were reported. The deployments, mostly between 2001 and 2005, typically lasted 3 months during which 86% reported no civilian income and 76% reported no civilian benefits. Solo practice providers reported the greatest financial losses due to continuing financial responsibility related to their civilian practice despite being deployed. Overall, 2 deployments did not change, 9 increased, and 16 decreased the medical officer's income. Two were not reported. In this small retrospective convenience sample study, solo practice U.S. Army Reserve health care providers were found to be at highest risk of financial losses during military deployments. This being said, no price can be put on the privilege of serving our men and women in uniform.

  2. Deployment Testing of Flexible Composite Hinges in Bi-Material Beams

    Science.gov (United States)

    Sauder, Jonathan F.; Trease, Brian

    2016-01-01

    Composites have excellent properties for strength, thermal stability, and weight. However, they are traditionally highly rigid, and when used in deployable structures require hinges bonded to the composite material, which increases complexity and opportunities for failure. Recent research in composites has found by adding an elastomeric soft matrix, often silicone instead of an epoxy, the composite becomes flexible. This work explores the deployment repeatability of silicone matrix composite hinges which join rigid composite beams. The hinges were found to have sub-millimeter linear deployment repeatability, and sub-degree angular deployment repeatability. Also, an interesting relaxation effect was discovered, as a hinges deployment error would decrease with time.

  3. DRAGON - 8U Nanosatellite Orbital Deployer

    Science.gov (United States)

    Dobrowolski, Marcin; Grygorczuk, Jerzy; Kedziora, Bartosz; Tokarz, Marta; Borys, Maciej

    2014-01-01

    The Space Research Centre of the Polish Academy of Sciences (SRC PAS) together with Astronika company have developed an Orbital Deployer called DRAGON for ejection of the Polish scientific nanosatellite BRITE-PL Heweliusz (Fig. 1). The device has three unique mechanisms including an adopted and scaled lock and release mechanism from the ESA Rosetta mission MUPUS instrument. This paper discusses major design restrictions of the deployer, unique design features, and lessons learned from development through testing.

  4. RSOI: Force Deployment Bottleneck

    National Research Council Canada - National Science Library

    D'Amato, Mark

    1998-01-01

    .... This runs counter to the popular belief that strategic lift is the limiting constraint. The study begins by highlighting the genesis of the military's current force projection strategy and the resulting importance of rapid force deployments...

  5. Deploying Embodied AI into Virtual Worlds

    Science.gov (United States)

    Burden, David J. H.

    The last two years have seen the start of commercial activity within virtual worlds. Unlike computer games where Non-Player-Character avatars are common, in most virtual worlds they are the exception — and until recently in Second Life they were non-existent. However there is real commercial scope for Als in these worlds — in roles from virtual sales staff and tutors to personal assistants. Deploying an embodied AI into a virtual world offers a unique opportunity to evaluate embodied Als, and to develop them within an environment where human and computer are on almost equal terms. This paper presents an architecture being used for the deployment of chatbot driven avatars within the Second Life virtual world, looks at the challenges of deploying an AI within such a virtual world, the possible implications for the Turing Test, and identifies research directions for the future.

  6. Abstracting application deployment on Cloud infrastructures

    Science.gov (United States)

    Aiftimiei, D. C.; Fattibene, E.; Gargana, R.; Panella, M.; Salomoni, D.

    2017-10-01

    Deploying a complex application on a Cloud-based infrastructure can be a challenging task. In this contribution we present an approach for Cloud-based deployment of applications and its present or future implementation in the framework of several projects, such as “!CHAOS: a cloud of controls” [1], a project funded by MIUR (Italian Ministry of Research and Education) to create a Cloud-based deployment of a control system and data acquisition framework, “INDIGO-DataCloud” [2], an EC H2020 project targeting among other things high-level deployment of applications on hybrid Clouds, and “Open City Platform”[3], an Italian project aiming to provide open Cloud solutions for Italian Public Administrations. We considered to use an orchestration service to hide the complex deployment of the application components, and to build an abstraction layer on top of the orchestration one. Through Heat [4] orchestration service, we prototyped a dynamic, on-demand, scalable platform of software components, based on OpenStack infrastructures. On top of the orchestration service we developed a prototype of a web interface exploiting the Heat APIs. The user can start an instance of the application without having knowledge about the underlying Cloud infrastructure and services. Moreover, the platform instance can be customized by choosing parameters related to the application such as the size of a File System or the number of instances of a NoSQL DB cluster. As soon as the desired platform is running, the web interface offers the possibility to scale some infrastructure components. In this contribution we describe the solution design and implementation, based on the application requirements, the details of the development of both the Heat templates and of the web interface, together with possible exploitation strategies of this work in Cloud data centers.

  7. 49 CFR 268.3 - Different phases of the Maglev Deployment Program.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Different phases of the Maglev Deployment Program... DEPLOYMENT PROGRAM Overview § 268.3 Different phases of the Maglev Deployment Program. (a) The Maglev... deadlines—based on the progress of the Maglev Deployment Program; grantees will be notified accordingly. (b...

  8. An ARM Mobile Facility Designed for Marine Deployments

    Science.gov (United States)

    Wiscombe, W. J.

    2007-05-01

    The U.S. Dept. of Energy's ARM (Atmospheric Radiation Measurements) Program is designing a Mobile Facility exclusively for marine deployments. This marine facility is patterned after ARM's land Mobile Facility, which had its inaugural deployment at Point Reyes, California, in 2005, followed by deployments to Niger in 2006 and Germany in 2007 (ongoing), and a planned deployment to China in 2008. These facilities are primarily intended for the study of clouds, radiation, aerosols, and surface processes with a goal to include these processes accurately in climate models. They are preferably embedded within larger field campaigns which provide context. They carry extensive instrumentation (in several large containers) including: cloud radar, lidar, microwave radiometers, infrared spectrometers, broadband and narrowband radiometers, sonde-launching facilities, extensive surface aerosol measurements, sky imagers, and surface latent and sensible heat flux devices. ARM's Mobile Facilities are designed for 6-10 month deployments in order to capture climatically-relevant datasets. They are available to any scientist, U.S. or international, who wishes to submit a proposal during the annual Spring call. The marine facility will be adapted to, and ruggedized for, the harsh marine environment and will add a scanning two-frequency radar, a boundary-layer wind profiler, a shortwave spectrometer, and aerosol instrumentation adapted to typical marine aerosols like sea salt. Plans also include the use of roving small UAVs, automated small boats, and undersea autonomous vehicles in order to address the point-to-area-average problem which is so crucial for informing climate models. Initial deployments are planned for small islands in climatically- interesting cloud regimes, followed by deployments on oceanic platforms (like decommissioned oil rigs and the quasi-permanent platform of this session's title) and eventually on large ships like car carriers plying routine routes.

  9. Modeling EERE deployment programs

    Energy Technology Data Exchange (ETDEWEB)

    Cort, K. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hostick, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Belzer, D. B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Livingston, O. V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-11-01

    The purpose of the project was to identify and characterize the modeling of deployment programs within the EERE Technology Development (TD) programs, address possible improvements to the modeling process, and note gaps in knowledge for future research.

  10. Keys to successful D and D technology deployments at the INEEL

    International Nuclear Information System (INIS)

    Smith, A.M.; Meservey, R. H.; Shoemaker, H.

    2000-01-01

    Seven improved decontamination and decommissioning (DandD) technologies were successfully deployed at the Idaho National Engineering and Environmental Laboratory (INEEL) during the Accelerated Site Technology Deployment (ASTD) Integrated Decontamination and Decommissioning (IDandD) project. The use of these improved technologies saved the INEEL $462K in fiscal year 1999, and is projected to save about $14M over the next ten years. Since deploying new technologies on DandD projects shows great potential for cost-savings, factors that led to successful deployment have been documented. These factors are described here as they apply to the seven deployments at the INEEL to assist with deployments at other DOE sites

  11. Origami-inspired, on-demand deployable and collapsible mechanical metamaterials with tunable stiffness

    Science.gov (United States)

    Zhai, Zirui; Wang, Yong; Jiang, Hanqing

    2018-03-01

    Origami has been employed to build deployable mechanical metamaterials through folding and unfolding along the crease lines. Deployable metamaterials are usually flexible, particularly along their deploying and collapsing directions, which unfortunately in many cases leads to an unstable deployed state, i.e., small perturbations may collapse the structure along the same deployment path. Here we create an origami-inspired mechanical metamaterial with on-demand deployability and selective collapsibility through energy analysis. This metamaterial has autonomous deployability from the collapsed state and can be selectively collapsed along two different paths, embodying low stiffness for one path and substantially high stiffness for another path. The created mechanical metamaterial yields load-bearing capability in the deployed direction while possessing great deployability and collapsibility. The principle in this work can be utilized to design and create versatile origami-inspired mechanical metamaterials that can find many applications.

  12. Infrastructure Engineering and Deployment Division

    Data.gov (United States)

    Federal Laboratory Consortium — Volpe's Infrastructure Engineering and Deployment Division advances transportation innovation by being leaders in infrastructure technology, including vehicles and...

  13. STEP flight experiments Large Deployable Reflector (LDR) telescope

    Science.gov (United States)

    Runge, F. C.

    1984-01-01

    Flight testing plans for a large deployable infrared reflector telescope to be tested on a space platform are discussed. Subsystem parts, subassemblies, and whole assemblies are discussed. Assurance of operational deployability, rigidization, alignment, and serviceability will be sought.

  14. Pneumothorax, without chest wall fracture, following airbag deployment

    Directory of Open Access Journals (Sweden)

    Samuel Parsons

    2010-12-01

    Full Text Available Air bags are an automatic crash protection system. They have been shown to reduce mortality from motor vehicle accidents by 31% following direct head-on impacts, by 19% following any frontal impact and by 11% overall. Despite obvious benefits there has been a corresponding increase in the number of injuries resulting from their deployment. We describe a case of a pneumothorax in the absence of chest wall pathology associated with airbag deployment, in a belted driver. There has been one previous description of pneumothorax associated with airbag deployment, in an unbelted driver.

  15. Treatment Deployment Evaluation Tool

    International Nuclear Information System (INIS)

    M. A. Rynearson; M. M. Plum

    1999-01-01

    The U.S. Department of Energy (DOE) is responsible for the final disposition of legacy spent nuclear fuel (SNF). As a response, DOE's National Spent Nuclear Fuel Program (NSNFP) has been given the responsibility for the disposition of DOE-owned SNF. Many treatment technologies have been identified to treat some forms of SNF so that the resulting treated product is acceptable by the disposition site. One of these promising treatment processes is the electrometallurgical treatment (EMT) currently in development; a second is an Acid Wash Decladding process. The NSNFP has been tasked with identifying possible strategies for the deployment of these treatment processes in the event that a treatment path is deemed necessary. To support the siting studies of these strategies, economic evaluations are being performed to identify the least-cost deployment path. This model (tool) was developed to consider the full scope of costs, technical feasibility, process material disposition, and schedule attributes over the life of each deployment alternative. Using standard personal computer (PC) software, the model was developed as a comprehensive technology economic assessment tool using a Life-Cycle Cost (LCC) analysis methodology. Model development was planned as a systematic, iterative process of identifying and bounding the required activities to dispose of SNF. To support the evaluation process, activities are decomposed into lower level, easier to estimate activities. Sensitivity studies can then be performed on these activities, defining cost issues and testing results against the originally stated problem

  16. Reactor power system deployment and startup

    International Nuclear Information System (INIS)

    Wetch, J.R.; Nelin, C.J.; Britt, E.J.; Klein, G.; Rasor Associates, Inc., Sunnyvale, CA; California Institute of Technology, Pasadena)

    1985-01-01

    This paper addresses issues that should receive further examination in the near-term as concept selection for development of a U.S. space reactor power system is approached. The issues include: the economics, practicality and system reliability associated with transfer of nuclear spacecraft from low earth shuttle orbits to operational orbits, via chemical propulsion versus nuclear electric propulsion; possible astronaut supervised reactor and nuclear electric propulsion startup in low altitude Shuttle orbit; potential deployment methods for nuclear powered spacecraft from Shuttle; the general public safety of low altitude startup and nuclear safe and disposal orbits; the question of preferred reactor power level; and the question of frozen versus molten alkali metal coolant during launch and deployment. These issues must be considered now because they impact the SP-100 concept selection, power level selection, weight and size limits, use of deployable radiators, reliability requirements, and economics, as well as the degree of need for and the urgency of developing space reactor power systems. 5 references

  17. High Gain Antenna System Deployment Mechanism Integration, Characterization, and Lessons Learned

    Science.gov (United States)

    Parong, Fil; Russell, Blair; Garcen, Walter; Rose, Chris; Johnson, Chris; Huber, Craig

    2014-01-01

    The integration and deployment testing of the High Gain Antenna System for the Global Precipitation Measurement mission is summarized. The HGAS deployment mechanism is described. The gravity negation system configuration and its influence on vertical, ground-based, deployment tests are presented with test data and model predictions. A focus is made on the late discovery and resolution of a potentially mission degrading deployment interference condition. The interaction of the flight deployment mechanism, gravity negation mechanism, and use of dynamic modeling is described and lessons learned presented.

  18. Reintegration Difficulty of Military Couples Following Deployment

    Science.gov (United States)

    2017-07-01

    reintegration. Communication and Generalized Anxiety The emotional cycle of deployment model provides a descrip- tive framework for understanding the...counseling. Thus, communication can have a reciprocal influence on the very appraisals and emotions that motivate interaction in the first place. Communication...of service members back into family life after deployment can be extremely challenging for military couples. Understanding the factors that

  19. A space release/deployment system actuated by shape memory wires

    Science.gov (United States)

    Fragnito, Marino; Vetrella and, Sergio

    2002-11-01

    In this paper, the design of an innovative hold down/release and deployment device actuated by shape memory wires, to be used for the first time for the S MA RT microsatellite solar wings is shown. The release and deployment mechanisms are actuated by a Shape Memory wire (Nitinol), which allows a complete symmetrical and synchronous release, in a very short time, of the four wings in pairs. The hold down kinematic mechanism is preloaded to avoid vibration nonlinearities and unwanted deployment at launch. The deployment mechanism is a simple pulley system. The stiffness of the deployed panel-hinge system needs to be dimensioned in order to meet the on-orbit requirement for attitude control. One-way roller clutches are used to keep the panel at the desired angle during the mission. An ad hoc software has been developed to simulate both the release and deployment operations, coupling the SMA wire behavior with the system mechanics.

  20. Fixed-axis electric sail deployment dynamics analysis using hub-mounted momentum control

    Science.gov (United States)

    Fulton, JoAnna; Schaub, Hanspeter

    2018-03-01

    The deployment dynamics of a spin stabilized electric sail (E-sail) with a hub-mounted control actuator are investigated. Both radial and tangential deployment mechanisms are considered to take the electric sail from a post-launch stowed configuration to a fully deployed configuration. The tangential configuration assumes the multi-kilometer tethers are wound up on the exterior of the spacecraft hub, similar to yo-yo despinner configurations. The deployment speed is controlled through the hub rate. The radial deployment configuration assumes each tether is on its own spool. Here both the hub and spool rate are control variables. The sensitivity of the deployment behavior to E-sail length, maximum rate and tension parameters is investigated. A constant hub rate deployment is compared to a time varying hub rate that maintains a constant tether tension condition. The deployment time can be reduced by a factor of 2 or more by using a tension controlled deployment configuration.

  1. Industrial deployment of system engineering methods

    CERN Document Server

    Romanovsky, Alexander

    2013-01-01

    A formal method is not the main engine of a development process, its contribution is to improve system dependability by motivating formalisation where useful. This book summarizes the results of the DEPLOY research project on engineering methods for dependable systems through the industrial deployment of formal methods in software development. The applications considered were in automotive, aerospace, railway, and enterprise information systems, and microprocessor design.  The project introduced a formal method, Event-B, into several industrial organisations and built on the lessons learned to

  2. Post-deployment usability evaluation of a radiology workstation

    NARCIS (Netherlands)

    Jorritsma, Wiard; Cnossen, Fokie; Dierckx, Rudi; Oudkerk, Matthijs; van Ooijen, Peter

    2015-01-01

    Objective To evaluate the usability of a radiology workstation after deployment in a hospital. Significance In radiology, it is difficult to perform valid pre-deployment usability evaluations due to the heterogeneity of the user group, the complexity of the radiological workflow, and the complexity

  3. Hitting the ground running: Healthgrid deployment and adoption

    NARCIS (Netherlands)

    Gwadry-Sridhar, Femida; Olabarriaga, Silvia D.; van Kampen, Antoine; Bauer, Michael; Solomonides, Tony

    2010-01-01

    We consider the issues of healthgrid development, deployment and adoption in health care and research environments. While healthgrid technology could be deployed to support advanced medical research, we are not seeing its wide adoption. Understanding why this technology is not being exploited is one

  4. Elastic Deployable Composite Tubular Roll-Out Boom, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Deployable Space Systems (DSS) has developed an affordable and ultra-lightweight elastically self-deployable Roll-Out Boom technology that provides affordability and...

  5. Deployment Strategies and Clustering Protocols Efficiency

    Directory of Open Access Journals (Sweden)

    Chérif Diallo

    2017-06-01

    Full Text Available Wireless sensor networks face significant design challenges due to limited computing and storage capacities and, most importantly, dependence on limited battery power. Energy is a critical resource and is often an important issue to the deployment of sensor applications that claim to be omnipresent in the world of future. Thus optimizing the deployment of sensors becomes a major constraint in the design and implementation of a WSN in order to ensure better network operations. In wireless networking, clustering techniques add scalability, reduce the computation complexity of routing protocols, allow data aggregation and then enhance the network performance. The well-known MaxMin clustering algorithm was previously generalized, corrected and validated. Then, in a previous work we have improved MaxMin by proposing a Single- node Cluster Reduction (SNCR mechanism which eliminates single-node clusters and then improve energy efficiency. In this paper, we show that MaxMin, because of its original pathological case, does not support the grid deployment topology, which is frequently used in WSN architectures. The unreliability feature of the wireless links could have negative impacts on Link Quality Indicator (LQI based clustering protocols. So, in the second part of this paper we show how our distributed Link Quality based d- Clustering Protocol (LQI-DCP has good performance in both stable and high unreliable link environments. Finally, performance evaluation results also show that LQI-DCP fully supports the grid deployment topology and is more energy efficient than MaxMin.

  6. Very Low Head Turbine Deployment in Canada

    International Nuclear Information System (INIS)

    Kemp, P; Williams, C; Sasseville, Remi; Anderson, N

    2014-01-01

    The Very Low Head (VLH) turbine is a recent turbine technology developed in Europe for low head sites in the 1.4 - 4.2 m range. The VLH turbine is primarily targeted for installation at existing hydraulic structures to provide a low impact, low cost, yet highly efficient solution. Over 35 VLH turbines have been successfully installed in Europe and the first VLH deployment for North America is underway at Wasdell Falls in Ontario, Canada. Deployment opportunities abound in Canada with an estimated 80,000 existing structures within North America for possible low-head hydro development. There are several new considerations and challenges for the deployment of the VLH turbine technology in Canada in adapting to the hydraulic, environmental, electrical and social requirements. Several studies were completed to determine suitable approaches and design modifications to mitigate risk and confirm turbine performance. Diverse types of existing weirs and spillways pose certain hydraulic design challenges. Physical and numerical modelling of the VLH deployment alternatives provided for performance optimization. For this application, studies characterizing the influence of upstream obstacles using water tunnel model testing as well as full-scale prototype flow dynamics testing were completed. A Cold Climate Adaptation Package (CCA) was developed to allow year-round turbine operation in ice covered rivers. The CCA package facilitates turbine extraction and accommodates ice forces, frazil ice, ad-freezing and cold temperatures that are not present at the European sites. The Permanent Magnet Generator (PMG) presents some unique challenges in meeting Canadian utility interconnection requirements. Specific attention to the frequency driver control and protection requirements resulted in a driver design with greater over-voltage capability for the PMG as well as other key attributes. Environmental studies in Europe included fish friendliness testing comprised of multiple in

  7. Very Low Head Turbine Deployment in Canada

    Science.gov (United States)

    Kemp, P.; Williams, C.; Sasseville, Remi; Anderson, N.

    2014-03-01

    The Very Low Head (VLH) turbine is a recent turbine technology developed in Europe for low head sites in the 1.4 - 4.2 m range. The VLH turbine is primarily targeted for installation at existing hydraulic structures to provide a low impact, low cost, yet highly efficient solution. Over 35 VLH turbines have been successfully installed in Europe and the first VLH deployment for North America is underway at Wasdell Falls in Ontario, Canada. Deployment opportunities abound in Canada with an estimated 80,000 existing structures within North America for possible low-head hydro development. There are several new considerations and challenges for the deployment of the VLH turbine technology in Canada in adapting to the hydraulic, environmental, electrical and social requirements. Several studies were completed to determine suitable approaches and design modifications to mitigate risk and confirm turbine performance. Diverse types of existing weirs and spillways pose certain hydraulic design challenges. Physical and numerical modelling of the VLH deployment alternatives provided for performance optimization. For this application, studies characterizing the influence of upstream obstacles using water tunnel model testing as well as full-scale prototype flow dynamics testing were completed. A Cold Climate Adaptation Package (CCA) was developed to allow year-round turbine operation in ice covered rivers. The CCA package facilitates turbine extraction and accommodates ice forces, frazil ice, ad-freezing and cold temperatures that are not present at the European sites. The Permanent Magnet Generator (PMG) presents some unique challenges in meeting Canadian utility interconnection requirements. Specific attention to the frequency driver control and protection requirements resulted in a driver design with greater over-voltage capability for the PMG as well as other key attributes. Environmental studies in Europe included fish friendliness testing comprised of multiple in

  8. Service Creation and Deployment in Converged Networks

    DEFF Research Database (Denmark)

    Soler, José

    for these experiences is the transition of telecommunication (telephony) networks from circuit switched based systems towards packet based ones. The text of this monograph proceeds, unaltered for the most, from the author’s PhD thesis “Framework for Deployment of Advanced Telecommunication Services in Current......This monograph (Early Experiences related to Service Creation & Deployment in Converged Networks) presents different experiences related to architectures and mechanisms for deployment of telephony services, understood as especial features complementing the basic voice service. The context...... and Future Converged Networks”, carried out at the Technical University of Denmark in the period [April 2002-April 2005]. Even though the technologies presented in the text have evolved from that period until now, the presented scenarios and setups are still valid as interesting initial steps in the realm....

  9. Features of the Calculation Deployment Large Transformable Structures of Different Configurations

    Directory of Open Access Journals (Sweden)

    V. N. Zimin

    2014-01-01

    Full Text Available Despite the significant progress achieved in the design of space transformable structures to ensure a smooth and reliable deployment remains an important task. This type of construction can consist of dozens, hundreds or even thousands of interconnected elements. Deployment transformable space structures in orbit to test their performance in orbital conditions are associated with high material costs. Full deploy: experimental development process transformable structures involve a number of fundamental difficulties: It is impossible to eliminate the influence of gravity and resistance forces conditions. Thus, to calculate deploy of large transformable structures of various configurations is an important stage of their creation. Simulation provides an opportunity to analyze various schemes of deploy, to reveal their advantages and possible disadvantages. For numerical analysis of deploy of such structures is necessary to use modern software modeling of the dynamics of multi-component of mechanical systems such as EULER and Adams. Simulation of deployment space transformable structures was performed taking as example folding flat antenna contours diameter of 5 m and 20 m, foldable spatial calibration reflector diameter of 3 m, deployable antenna reflector truss-type aperture 3×6 m.The results of the calculations represent following characteristics: the time of adoption of the working position structures; form intermediate positions structures during deployment; dependence of opening angles and angular velocities of the design links on the time. The parameters of these calculations can be used as input in the development of structural elements providing deployment. They can also be used to prepare stands for experimental testing of disclosure designs in ground conditions. It should be noted that the theoretical models are the only way to analyze the deployment of such structures for possible emergency situations.

  10. Morphing structures using soft polymers for active deployment

    International Nuclear Information System (INIS)

    Daynes, Stephen; Grisdale, Amy; Trask, Richard; Seddon, Annela

    2014-01-01

    In this study, we take inspiration from morphing strategies observed in nature, origami design and stiffness tailoring principles in engineering, to develop a thin walled, low cost, bistable cell geometry capable of reversibly unfolding from a flat configuration to a highly textured configuration. Finite element analysis was used to model the cell deployment and capture the experimentally observed bistability of the reinforced silicone elastomer. Through the combination of flexible elastomers with locally reinforced regions enables a highly tailorable and controllable deployment response. These cells are bistable allowing them to maintain their shape when either deployed or retracted without sustained actuation. It is proposed that such deployable cells with reversible surfaces and texture change can be used as a means of adaptive camouflage. (fast track communication)

  11. EarthScope's Transportable Array: Status of the Alaska Deployment and Guide to Resources for Lower48 Deployment

    Science.gov (United States)

    Busby, R. W.; Woodward, R.; Aderhold, K.; Frassetto, A.

    2017-12-01

    The Alaska Transportable Array deployment is completely installed, totaling 280 stations, with 194 new stations and 86 existing stations, 28 of those upgraded with new sensor emplacement. We briefly summarize the deployment of this seismic network, describe the added meteorological instruments and soil temperature gauges, and review our expectations for operation and demobilization. Curation of data from the contiguous Lower-48 States deployment of Transportable Array (>1800 stations, 2004-2015) has continued with the few gaps in real-time data replaced by locally archived files as well as minor adjustments in metadata. We highlight station digests that provide more detail on the components and settings of individual stations, documentation of standard procedures used throughout the deployment and other resources available online. In cooperation with IRIS DMC, a copy of the complete TA archive for the Lower-48 period has been transferred to a local disk to experiment with data access and software workflows that utilize most or all of the seismic timeseries, in contrast to event segments. Assembling such large datasets reliably - from field stations to a well managed data archive to a user's workspace - is complex. Sharing a curated and defined data volume with researchers is a potentially straightforward way to make data intensive analyses less difficult. We note that data collection within the Lower-48 continues with 160 stations of the N4 network operating at increased sample rates (100 sps) as part of the CEUSN, as operational support transitions from NSF to USGS.

  12. Cognitive ability and risk of post-traumatic stress disorder after military deployment

    DEFF Research Database (Denmark)

    Nissen, Lars R.; Karstoft, Karen-Inge; Vedtofte, Mia S.

    2017-01-01

    Background: Studies of the association between pre-deployment cognitive ability and post-deployment post-traumatic stress disorder (PTSD) have shown mixed results. Aims: To study the influence of pre-deployment cognitive ability on PTSD symptoms 6-8 months post-deployment in a large population...

  13. Paving the Way for Small Satellite Access to Orbit: Cyclops' Deployment of SpinSat, the Largest Satellite Ever Deployed from the International Space Station

    Science.gov (United States)

    Hershey, Matthew P.; Newswander, Daniel R.; Smith, James P.; Lamb, Craig R.; Ballard, Perry G.

    2015-01-01

    The Space Station Integrated Kinetic Launcher for Orbital Payload Systems (SSIKLOPS), known as "Cyclops" to the International Space Station (ISS) community, successfully deployed the largest satellite ever (SpinSat) from the ISS on November 28, 2014. Cyclops, a collaboration between the NASA ISS Program, NASA Johnson Space Center Engineering, and Department of Defense Space Test Program (DoD STP) communities, is a dedicated 10-100 kg class ISS small satellite deployment system. This paper will showcase the successful deployment of SpinSat from the ISS. It will also outline the concept of operations, interfaces, requirements, and processes for satellites to utilize the Cyclops satellite deployment system.

  14. 15 CFR 270.102 - Conditions for establishment and deployment of a Team.

    Science.gov (United States)

    2010-01-01

    ... deployment of a Team. 270.102 Section 270.102 Commerce and Foreign Trade Regulations Relating to Commerce and... SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.102 Conditions for establishment and deployment of a Team. (a) The Director may establish a Team for deployment...

  15. ALMR deployment economic analysis

    International Nuclear Information System (INIS)

    Delene, J.G.; Fuller, L.C.; Hudson, C.R.

    1993-06-01

    This analysis seeks to model and evaluate the economics of the use of Advanced Liquid Metal Reactors (ALMR) as a component of this country's future electricity generation mix. The ALMR concept has the ability to utilize as fuel the fissile material contained in previously irradiated nuclear fuel (i.e., spent fuel). While not a requirement for the successful deployment of ALMR power plant technology, the reprocessing of spent fuel from light water reactors (LWR) is necessary for any rapid introduction of ALMR power plants. In addition, the reprocessing of LWR spent fuel may reduce the number of high level waste repositories needed in the future by burning the long-lived actinides produced in the fission process. With this study, the relative economics of a number of potential scenarios related to these issues are evaluated. While not encompassing the full range of all possibilities, the cases reported here provide an indication of the potential costs, timings, and relative economic attractiveness of ALMR deployment

  16. Automated scheme to determine design parameters for a recoverable reentry vehicle

    International Nuclear Information System (INIS)

    Williamson, W.E.

    1976-01-01

    The NRV (Nosetip Recovery Vehicle) program at Sandia Laboratories is designed to recover the nose section from a sphere cone reentry vehicle after it has flown a near ICBM reentry trajectory. Both mass jettison and parachutes are used to reduce the velocity of the RV near the end of the trajectory to a sufficiently low level that the vehicle may land intact. The design problem of determining mass jettison time and parachute deployment time in order to ensure that the vehicle does land intact is considered. The problem is formulated as a min-max optimization problem where the design parameters are to be selected to minimize the maximum possible deviation in the design criteria due to uncertainties in the system. The results of the study indicate that the optimal choice of the design parameters ensures that the maximum deviation in the design criteria is within acceptable bounds. This analytically ensures the feasibility of recovery for NRV

  17. Mars Exploration Rover Heat Shield Recontact Analysis

    Science.gov (United States)

    Raiszadeh, Behzad; Desai, Prasun N.; Michelltree, Robert

    2011-01-01

    The twin Mars Exploration Rover missions landed successfully on Mars surface in January of 2004. Both missions used a parachute system to slow the rover s descent rate from supersonic to subsonic speeds. Shortly after parachute deployment, the heat shield, which protected the rover during the hypersonic entry phase of the mission, was jettisoned using push-off springs. Mission designers were concerned about the heat shield recontacting the lander after separation, so a separation analysis was conducted to quantify risks. This analysis was used to choose a proper heat shield ballast mass to ensure successful separation with low probability of recontact. This paper presents the details of such an analysis, its assumptions, and the results. During both landings, the radar was able to lock on to the heat shield, measuring its distance, as it descended away from the lander. This data is presented and is used to validate the heat shield separation/recontact analysis.

  18. 49 CFR 268.5 - Federal funding sources for the Maglev Deployment Program.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Federal funding sources for the Maglev Deployment... TECHNOLOGY DEPLOYMENT PROGRAM Overview § 268.5 Federal funding sources for the Maglev Deployment Program. (a) Federal Maglev Funds. Section 322 of Title 23 provides for the following funds for the Maglev Deployment...

  19. Supporting Military Families with Young Children throughout the Deployment Lifecycle

    Science.gov (United States)

    2016-10-01

    Group, Family Advocacy, Child and Family Behavioral Health, Soldier Readiness Program (SRP), Family Life Chaplain Training Center, Fort Hood Housing ...resilience and child well-being, Soldier and non-deploying parents must successfully meet the challenges of caregiving throughout the deployment cycle ...reintegration program to reduce parenting stress and promote family resilience in Active Duty military families through all phases of the deployment cycle

  20. Deployment Effects of Marin Renewable Energy Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Brian Polagye; Mirko Previsic

    2010-06-17

    Given proper care in siting, design, deployment, operation and maintenance, marine and hydrokinetic technologies could become one of the more environmentally benign sources of electricity generation. In order to accelerate the adoption of these emerging hydrokinetic and marine energy technologies, navigational and environmental concerns must be identified and addressed. All developing hydrokinetic projects involve a wide variety of stakeholders. One of the key issues that site developers face as they engage with this range of stakeholders is that many of the possible conflicts (e.g., shipping and fishing) and environmental issues are not well-understood, due to a lack of technical certainty. In September 2008, re vision consulting, LLC was selected by the Department of Energy (DoE) to apply a scenario-based approach to the emerging wave and tidal technology sectors in order to evaluate the impact of these technologies on the marine environment and potentially conflicting uses. The project’s scope of work includes the establishment of baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios will capture variations in technical approaches and deployment scales to properly identify and characterize environmental impacts and navigational effects. The goal of the project is to provide all stakeholders with an improved understanding of the potential effects of these emerging technologies and focus all stakeholders onto the critical issues that need to be addressed. This groundwork will also help in streamlining siting and associated permitting processes, which are considered key hurdles for the industry’s development in the U.S. today. Re vision is coordinating its efforts with two other project teams funded by DoE which are focused on regulatory and navigational issues. The results of this study are structured into three reports: 1. Wave power scenario description 2. Tidal power scenario description 3. Framework for

  1. On the Integration of Automatic Deployment into the ABS Modeling Language

    NARCIS (Netherlands)

    C.P.T. de Gouw (Stijn); M. Lienhardt; J. Mauro (Jacopo); B. Nobakht (Behrooz); G. Zavattaro (Gianluigi); S. Dustdar; F. Leymann; M. Villari

    2015-01-01

    htmlabstractIn modern software systems, deployment is an integral and critical part of application development (see, e.g., the DevOps approach to software development). Nevertheless, deployment is usually overlooked at the modeling level, thus losing the possibility to perform deployment conscious

  2. LWR Spent Fuel Management for the Smooth Deployment of FBR

    International Nuclear Information System (INIS)

    Fukasawa, T.; Yamashita, J.; Hoshino, K.; Sasahira, A.; Inoue, T.; Minato, K.; Sato, S.

    2015-01-01

    Fast breeder reactors (FBR) and FBR fuel cycle are indispensable to prevent the global warming and to secure the long-term energy supply. Commercial FBR expects to be deployed from around 2050 until around 2110 in Japan by the replacement of light water reactors (LWR) after their 60 years life. The FBR deployment needs Pu (MOX) from the LWR-spent fuel (SF) reprocessing. As Japan can posses little excess Pu, its balance control is necessary between LWR-SF management (reprocessing) and FBR deployment. The fuel cycle systems were investigated for the smooth FBR deployment and the effectiveness of proposed flexible system was clarified in this work. (author)

  3. Accelerating the deployment of offshore renewable energy technologies. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    MacDonald, Mott

    2011-02-15

    Offshore wind energy and ocean energy (i.e. wave and tidal) are at different stages of technology development and deployment, and, as such, they require different approaches for successful deployment. However, regardless of their deployment stage, these technologies may face common hurdles in their way to market competitiveness. IEA-RETD has completed a study with the overall objective to assist policy makers and project developers in a better understanding of these barriers and the specifics of offshore renewable energy and to give them practical guidelines. These include an offshore energy deployment framework, substantiated by evidence-based analyses, and recommendations for future policies design, including best practices for allocation of seafloor rights.

  4. IEA Wind Task 23 Offshore Wind Technology and Deployment. Subtask 1 Experience with Critical Deployment Issues. Final Technical Report

    OpenAIRE

    Lemming, Jørgen Kjærgaard

    2010-01-01

    The final report for IEA Wind Task 23, Offshore Wind Energy Technology and Deployment, is made up of two separate reports: Subtask 1: Experience with Critical Deployment Issues and Subtask 2: Offshore Code Comparison Collaborative (OC3). The Subtask 1 report included here provides background information and objectives of Task 23. It specifically discusses ecological issues and regulation, electrical system integration and offshore wind, external conditions, and key conclusions for Subtask 1. ...

  5. In-Flight Suppressant Deployment Temperatures

    National Research Council Canada - National Science Library

    Bein, Donald

    2006-01-01

    .... An assessment is made of the model output versus some aircraft measurement data, fire suppressant boiling point criterion, as well as the history of altitude/temperature at which fire suppressants have been deployed...

  6. A Comparison of Dependent Primary Care Utilization Rates Based on Deployments

    Science.gov (United States)

    2009-03-09

    analysis to obtain the deployment data was completed by ASMR , another contractor used to Health Care Utilization and Deployments 15 complete...2007. The deployment dataset was created by ASMR using all encounter data for active duty Soldiers and running the Social Security numbers of these

  7. White Paper on Dish Stirling Technology: Path Toward Commercial Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Andraka, Charles E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Concentrating Solar Power Dept.; Stechel, Ellen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Concentrating Solar Power Dept.; Becker, Peter [Stirling Energy Systems, Scottsdale, AZ (United States); Messick, Brian [Stirling Energy Systems, Scottsdale, AZ (United States)

    2016-07-01

    Dish Stirling energy systems have been developed for distributed and large-scale utility deployment. This report summarizes the state of the technology in a joint project between Stirling Energy Systems, Sandia National Laboratories, and the Department of Energy in 2011. It then lays out a feasible path to large scale deployment, including development needs and anticipated cost reduction paths that will make a viable deployment product.

  8. Standardization of transportation classes for object-oriented deployment simulations.

    Energy Technology Data Exchange (ETDEWEB)

    Burke, J. F., Jr.; Howard, D. L.; Jackson, J.; Macal, C. M.; Nevins, M. R.; Van Groningen, C. N.

    1999-07-30

    Many recent efforts to integrate transportation and deployment simulations, although beneficial, have lacked a feature vital for seamless integration: a common data class representation. It is an objective of the Department of Defense (DoD) to standardize all classes used in object-oriented deployment simulations by developing a standard class attribute representation and behavior for all deployment simulations that rely on an underlying class representation. The Extensive Hierarchy and Object Representation for Transportation Simulations (EXHORT) is a collection of three hierarchies that together will constitute a standard and consistent class attribute representation and behavior that could be used directly by a large set of deployment simulations. The first hierarchy is the Transportation Class Hierarchy (TCH), which describes a significant portion of the defense transportation system; the other two deal with infrastructure and resource classes. EXHORT will allow deployment simulations to use the same set of underlying class data, ensure transparent exchanges, reduce the effort needed to integrate simulations, and permit a detailed analysis of the defense transportation system. This paper describes EXHORT's first hierarchy, the TCH, and provides a rationale for why it is a helpful tool for modeling major portions of the defense transportation system.

  9. Solar array deployment analysis considering path-dependent behavior of a tape spring hinge

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kyung Won; Park, Young Jin [KAIST, Daejeon (Korea, Republic of)

    2015-05-15

    Solar array deployment analysis is conducted considering the path-dependent nonlinear behavior of tape spring hinge. Such hinges offer many advantages over rigid hinges; they are self-deployable, self-locking, lightweight, and simple. However, they show strongly nonlinear behavior with respect to rotation angle, making deployment analysis difficult. To accurately consider the characteristics of tape spring hinges for deployment analysis, a path-dependent path identification (PI) method for tracing the previous path of the moment is introduced. To analyze the deployment motion, the governing equation for solar array deployment is derived within the framework of Kane's dynamic equation for three deployable solar panels. The numerical solution is compared with the Recurdyn's multi-body dynamics analysis solution using experimentally measured moment-rotation profiles. Solar array deployment analysis is conducted by considering and not considering the path-dependent PI method. This simulation example shows that the proposed path-dependent PI method is very effective for accurately predicting the deployment motion.

  10. FY2000 Hanford Technology Deployment Accomplishments Fact Sheets

    International Nuclear Information System (INIS)

    WIBLE, R.A.

    2001-01-01

    Cleaning up the Hanford Site is one of the top priorities for the U. S. Department of Energy. The department is continually looking for ways to expedite cleanup and reduce costs. During Fiscal Year (FY) 2000. Hanford Site staff deployed 24 new technologies, which produced an estimated lifecycle cost savings of 479 million dollars. This is a clear indicator of the impacts new technology has had and will have on the cleanup efforts. The Hanford Site cleanup is focused on the following: Restoring the Columbia River Corridor; Building and operating the tank waste treatment complex to complete the cleanup of highly radioactive tank waste at Hanford; and Transitioning the Central Plateau. Applying innovative science and technology from national laboratories, universities, and private industry is critical to our complex cleanup mission. The 24 new technologies deployed in FY 2000 are significantly higher than our goal of 14 technological deployments. Eleven of these technologies supported restoring the Columbia River Corridor, and seven were involved with the remediation of radioactive tank waste. These deployments produced valuable information to determine the effectiveness of the new technologies in the field and the efficiencies gained over existing cleanup methods. In several cases, the technology deployed presented a solution to a problem where a clear path of remediation had not yet been determined. New and innovative technologies will play a significant role in the cleanup of the Hanford Site and enable remediation to be done more efficiently. Technology is being developed at a staggering pace. This requires excellent communication throughout the scientific and industry arenas. To effect this communication, we have implemented a technology needs process in conjunction with the multi-year work planning process. Through the combination of these two processes, technology developments and deployments address the near-term technology needs and enable us to plan for the

  11. State perspectives on clean coal technology deployment

    Energy Technology Data Exchange (ETDEWEB)

    Moreland, T. [State of Illinois Washington Office, Washington, DC (United States)

    1997-12-31

    State governments have been funding partners in the Clean Coal Technology program since its beginnings. Today, regulatory and market uncertainties and tight budgets have reduced state investment in energy R and D, but states have developed program initiatives in support of deployment. State officials think that the federal government must continue to support these technologies in the deployment phase. Discussions of national energy policy must include attention to the Clean Coal Technology program and its accomplishments.

  12. Post-deployment family violence among UK military personnel.

    Science.gov (United States)

    Kwan, Jamie; Jones, Margaret; Somaini, Greta; Hull, Lisa; Wessely, Simon; Fear, Nicola T; MacManus, Deirdre

    2017-12-19

    Research into violence among military personnel has not differentiated between stranger- and family-directed violence. While military factors (combat exposure and post-deployment mental health problems) are risk factors for general violence, there has been limited research on their impact on violence within the family environment. This study aims to compare the prevalence of family-directed and stranger-directed violence among a deployed sample of UK military personnel and to explore risk factors associated with both family- and stranger-directed violence. This study utilised data from a large cohort study which collected information by questionnaire from a representative sample of randomly selected deployed UK military personnel (n = 6711). The prevalence of family violence immediately following return from deployment was 3.6% and 7.8% for stranger violence. Family violence was significantly associated with having left service, while stranger violence was associated with younger age, male gender, being single, having a history of antisocial behaviour as well as having left service. Deployment in a combat role was significantly associated with both family and stranger violence after adjustment for confounders [adjusted odds ratio (aOR) = 1.92 (1.25-2.94), p = 0.003 and aOR = 1.77 (1.31-2.40), p violence both inside and outside the family environment and should be considered in violence reduction programmes for military personnel. Further research using a validated measurement tool for family violence would improve comparability with other research.

  13. Military deployment and reintegration: a systematic review of child coping.

    Science.gov (United States)

    Bello-Utu, Cindy F; DeSocio, Janiece E

    2015-02-01

    Child coping with parent military deployment and family reintegration. A systematic review of research literature was conducted to examine the effects of deployment and family reintegration on children in military families. A search of CINAHL, PubMed, Psyc-INFO, and SocINDEX databases was performed using the terms "military family," "military child," "child coping," "deployment," and "reintegration." The search was limited to publications between 2001 and 2014 to focus on the effects of Operation Enduring Freedom (OEF), Operation Iraqi Freedom (OIF), and Operation New Dawn (OND). Twenty-seven research reports met inclusion criteria. Three themes were extracted: A child's coping is influenced by (a) the child's age and development, (b) the mental health and coping of the non-deployed parent during deployment, and the mental health of both parents during family reintegration, and (c) the pre-existing resilience/vulnerability, cumulative risks, and resources of the child and family. © 2015 Wiley Periodicals, Inc.

  14. Clinical Predictive Modeling Development and Deployment through FHIR Web Services.

    Science.gov (United States)

    Khalilia, Mohammed; Choi, Myung; Henderson, Amelia; Iyengar, Sneha; Braunstein, Mark; Sun, Jimeng

    2015-01-01

    Clinical predictive modeling involves two challenging tasks: model development and model deployment. In this paper we demonstrate a software architecture for developing and deploying clinical predictive models using web services via the Health Level 7 (HL7) Fast Healthcare Interoperability Resources (FHIR) standard. The services enable model development using electronic health records (EHRs) stored in OMOP CDM databases and model deployment for scoring individual patients through FHIR resources. The MIMIC2 ICU dataset and a synthetic outpatient dataset were transformed into OMOP CDM databases for predictive model development. The resulting predictive models are deployed as FHIR resources, which receive requests of patient information, perform prediction against the deployed predictive model and respond with prediction scores. To assess the practicality of this approach we evaluated the response and prediction time of the FHIR modeling web services. We found the system to be reasonably fast with one second total response time per patient prediction.

  15. The Deployment of Product-Related Environmental Legislation into Product Requirements

    Directory of Open Access Journals (Sweden)

    Daniela C. A. Pigosso

    2016-04-01

    Full Text Available Environmental legislation is increasingly changing its focus from manufacturing-oriented to product-oriented instruments. Compliance with product-related environmental legislation is achieved by the incorporation of environmental requirements into the early phases of the product development process (PDP. Nevertheless, the deployment of product-related environmental legislation into product requirements is still a challenge. This study followed an inductive approach to propose a guideline to support the identification, analysis and deployment of product requirements based on product-related environmental legislation. The guideline is composed of nine steps, clustered into three groups according to their main objective: (A identification of environmental product-related legislation; (B identification of legislative topics to be considered for the deployment of requirements; and (C creation and validation of product requirements. The product requirements deployed are to be considered during the PDP. The guideline was evaluated in an expert consultation in a large manufacturing company, suggesting that it can be used to support the systematization and deployment of product-related environmental requirements.

  16. Structural analysis of ITER multi-purpose deployer

    International Nuclear Information System (INIS)

    Manuelraj, Manoah Stephen; Dutta, Pramit; Gotewal, Krishan Kumar; Rastogi, Naveen; Tesini, Alessandro; Choi, Chang-Hwan

    2016-01-01

    Highlights: • System modelling for structural analysis of the Multi-Purpose Deployer (MPD). • Finite element modeling of the Multi-Purpose Deployer (MPD). • Static, modal and seismic response analysis of the Multi-Purpose Deployer (MPD). • Iterative structural analysis and design update to satisfy the structural criteria. • Modal analysis for various kinematic configurations. • Reaction force calculations on the interfacing systems. - Abstract: The Multi-Purpose Deployer (MPD) is a general purpose ITER in-vessel remote handling (RH) system. The main handling equipment, known as the MPD Transporter, consists of a series of linked bodies, which provide anchoring to the vacuum vessel port and an articulated multi-degree of freedom motion to perform various in-vessel maintenance tasks. During the in-vessel operations, the structural integrity of the system should be guaranteed against various operational and seismic loads. This paper presents the structural analysis results of the concept design of the MPD Transporter considering the seismic events. Static structural, modal and frequency response spectrum analyses have been performed to verify the structural integrity of the system, and to provide reaction forces to the interfacing systems such as vacuum vessel and cask. Iterative analyses and design updates are carried out based on the reference design of the system to improve the structural behavior of the system. The frequency responses of the system in various kinematics and payloads are assessed.

  17. Connected Vehicle Pilot Deployment Program phase 1 : comprehensive deployment plan : New York City : volume 1 : technical application : part I : technical and management approach.

    Science.gov (United States)

    2016-08-01

    This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...

  18. Hard is Normal: Military Families' Transitions Within the Process of Deployment.

    Science.gov (United States)

    Yablonsky, Abigail M; Barbero, Edie Devers; Richardson, Jeanita W

    2016-02-01

    US military deployments have become more frequent and lengthier in duration since 2003. Over half of US military members are married, and many also have children. The authors sought to understand the process of deployment from the perspective of the military family. After a thorough search of the literature, 21 primary research reports of 19 studies with an aggregate sample of 874 were analyzed using qualitative metasynthesis. The deployment process was experienced in four temporal domains. The military family as a whole shared the pre-deployment transition: all family members felt uncertain about the future, needed to complete tasks to "get ready" for deployment, and experienced a sense of distancing in preparation for the upcoming separation. The AD member went through the deployment transition independently, needing to "stay engaged" with the military mission, building a surrogate family and simultaneously trying to maintain connection with the family at home. In parallel, the home front family was going through a transposement transition, moving forward as an altered family unit, taking on new roles and responsibilities, and trying to simultaneously connect with the deployed member and find support from other military families. In post-deployment, the family went through the "reintegration" transition together, managing expectations, and readjusting family roles, all needing understanding and appreciation for their sacrifices during the recent separation. Effective family communication was important for military family well-being after deployment but unexpectedly challenging for many. Clinical, research, and policy recommendations are discussed. © 2015 Wiley Periodicals, Inc. This article has been contributed to by a US Government employee and her work is in the public domain in the USA.

  19. Realization and testing of a deployable space telescope based on tape springs

    Science.gov (United States)

    Lei, Wang; Li, Chuang; Zhong, Peifeng; Chong, Yaqin; Jing, Nan

    2017-08-01

    For its compact size and light weight, space telescope with deployable support structure for its secondary mirror is very suitable as an optical payload for a nanosatellite or a cubesat. Firstly the realization of a prototype deployable space telescope based on tape springs is introduced in this paper. The deployable telescope is composed of primary mirror assembly, secondary mirror assembly, 6 foldable tape springs to support the secondary mirror assembly, deployable baffle, aft optic components, and a set of lock-released devices based on shape memory alloy, etc. Then the deployment errors of the secondary mirror are measured with three-coordinate measuring machine to examine the alignment accuracy between the primary mirror and the deployed secondary mirror. Finally modal identification is completed for the telescope in deployment state to investigate its dynamic behavior with impact hammer testing. The results of the experimental modal identification agree with those from finite element analysis well.

  20. A Novel Methodology for Charging Station Deployment

    Science.gov (United States)

    Sun, Zhonghao; Zhao, Yunwei; He, Yueying; Li, Mingzhe

    2018-02-01

    Lack of charging stations has been a main obstacle to the promotion of electric vehicles. This paper studies deploying charging stations in traffic networks considering grid constraints to balance the charging demand and grid stability. First, we propose a statistical model for charging demand. Then we combine the charging demand model with power grid constraints and give the formulation of the charging station deployment problem. Finally, we propose a theoretical solution for the problem by transforming it to a Markov Decision Process.

  1. Design and analysis of a deployable truss for the large modular mesh antenna

    Science.gov (United States)

    Meguro, Akira

    This paper describes the design and deployment analysis for large deployable modular mesh antennas. Key design criteria are deployability, and the driving force and latching moment requirements. Reaction forces and moments due to mesh and cable network seriously influence the driving force. These forces and moments can be precisely estimated by means of analyzing the cable network using Cable Structure Analyzer (CASA). Deployment analysis is carried out using Dynamic Analysis and Design System (DADS). The influence of alignment errors on the driving reaction force can be eliminated by replacing the joint element with a spring element. The joint slop is also modeled using a discontinuous spring elements. Their design approach for three types of deployable modules and the deployment characterstics of three Bread-Board Models based on those designs are also presented. In order to study gravity effects on the deployment characteristics and the effects of the gravity compensation method, ground deployment analysis is carried out. A planned deployment test that will use aircraft parabolic flight to simulate a micro-gravity environment is also described.

  2. Pulmonary Function and Respiratory Health of Military Personnel Before Southwest Asia Deployment.

    Science.gov (United States)

    Skabelund, Andrew J; Rawlins, Frederic A; McCann, Edward T; Lospinoso, Joshua A; Burroughs, Lorraine; Gallup, Roger A; Morris, Michael J

    2017-09-01

    Significant concern exists regarding the respiratory health of military personnel deployed to Southwest Asia, given their exposures to numerous environmental hazards. Although the deployed military force is generally assumed to be fit, the pre-deployment respiratory health of these individuals is largely unknown. Soldiers deploying to Southwest Asia were recruited from the pre-deployment processing center at Fort Hood, Texas. Participants completed a general and respiratory health questionnaire and performed baseline spirometry. One thousand six hundred ninety-three pre-deployment evaluations were completed. The average age of the participants was 32.2 y, and 83.1% were male. More than one third of surveyed solders had a smoking history, 73% were overweight or obese, and 6.2% reported a history of asthma. Abnormal spirometry was found in 22.3% of participants. Soldiers with abnormal spirometry reported more asthma (10.1% vs 5.1%, P military personnel that delineates factors potentially associated with the development of pulmonary symptoms and/or disease. This study suggests that deploying soldiers are older, heavier, frequently smoke, and may have undiagnosed pre-deployment lung disease. Abnormal spirometry is common but may not represent underlying disease. Self-reported asthma, wheezing, and slower 2-mile run times were predictive of abnormal spirometry. Pre-deployment evaluation of military personnel identified numerous soldiers with active pulmonary symptoms and abnormal spirometry. When combined with questions regarding asthma history, wheezing and exercise intolerance, spirometry may identify individuals at risk for deployment-related respiratory complaints. Copyright © 2017 by Daedalus Enterprises.

  3. Optimizing Cloud-RAN Deployments in Real-life Scenarios Using Microwave Radio

    DEFF Research Database (Denmark)

    Al-obaidi, Rami; Checko, Aleksandra; Holm, Henrik

    2015-01-01

    Cloud Radio Access Network (C-RAN) is a new architecture designed to be the candidate for enabling future mobile networks. However, it will be deployed only if it is economically viable. In this paper we investigate the technological options of C-RAN deployments. By using analytical methods we...... derive engineering guidelines for minimizing the CAPital EXpenditure (CAPEX) of C-RAN deployment. We show for which population density and span of BBU Pool coverage usage of Microwave Radio (MWR) links is viable. For larger scale deployment we recommend to divide the area into multiple BBU Pools....

  4. Assessing the PACE of California residential solar deployment: Impacts of Property Assessed Clean Energy programs on residential solar photovoltaic deployment in California, 2010-2015

    Energy Technology Data Exchange (ETDEWEB)

    Deason, Jeff; Murphy, Sean

    2018-04-04

    A new study by Berkeley Lab found that residential Property Assessed Clean Energy (R-PACE) programs increased deployment of residential solar photovoltaic (PV) systems in California, raising it by about 7-12% in cities that adopt these programs. R-PACE is a financing mechanism that uses a voluntary property tax assessment, paid off over time, to facilitate energy improvements and, in some jurisdictions, water and resilience measures. While previous studies demonstrated that early, regional R-PACE programs increased solar PV deployment, this new analysis is the first to demonstrate these impacts from the large, statewide R-PACE programs dominating the California market today, which use private capital to fund the upfront costs of the improvements. Berkeley Lab estimated the impacts using econometric techniques on two samples: -Large cities only, allowing annual demographic and economic data as control variables -All California cities, without these annual data Analysis of both samples controls for several factors other than R-PACE that would be expected to drive solar PV deployment. We infer that on average, cities with R-PACE programs were associated with greater solar PV deployment in our study period (2010-2015). In the large cities sample, solar PV deployment in jurisdictions with R-PACE programs was higher by 1.1 watts per owner-occupied household per month, or 12%. Across all cities, solar PV deployment in jurisdictions with R-PACE programs was higher by 0.6 watts per owner-occupied household per month, or 7%. The large cities results are statistically significant at conventional levels; the all-cities results are not. The estimates imply that the majority of solar PV deployment financed by R-PACE programs would likely not have occurred in their absence. Results suggest that R-PACE programs have increased PV deployment in California even in relatively recent years, as R-PACE programs have grown in market share and as alternate approaches for financing solar PV

  5. Self managing monitoring for highly elastic large scale Cloud deployments

    OpenAIRE

    Ward, Jonathan Stuart; Barker, Adam David

    2014-01-01

    Infrastructure as a Service computing exhibits a number of properties, which are not found in conventional server deployments. Elasticity is among the most significant of these properties which has wide reaching implications for applications deployed in cloud hosted VMs. Among the applications affected by elasticity is monitoring. In this paper we investigate the challenges of monitoring large cloud deployments and how these challenges differ from previous monitoring problems. In order to mee...

  6. Deployment Methods for an Origami-Inspired Rigid-Foldable Array

    Science.gov (United States)

    Zirbel, Shannon A.; Trease, Brian P.; Magleby, Spencer P.; Howell, Larry L.

    2014-01-01

    The purpose of this work is to evaluate several deployment methods for an origami-inspired solar array at two size scales: 25-meter array and CubeSat array. The array enables rigid panel deployment and introduces new concepts for actuating CubeSat deployables. The design for the array was inspired by the origami flasher model (Lang, 1997; Shafer, 2001). Figure 1 shows the array prototyped from Garolite and Kapton film at the CubeSat scale. Prior work demonstrated that rigid panels like solar cells could successfully be folded into the final stowed configuration without requiring the panels to flex (Zirbel, Lang, Thomson, & al., 2013). The design of the array is novel and enables efficient use of space. The array can be wrapped around the central bus of the spacecraft in the case of the large array, or can accommodate storage of a small instrument payload in the case of the CubeSat array. The radial symmetry of this array around the spacecraft is ideally suited for spacecraft that need to spin. This work focuses on several actuation methods for a one-time deployment of the array. The array is launched in its stowed configuration and it will be deployed when it is in space. Concepts for both passive and active actuation were considered.

  7. Biomarkers of post-deployment resilience among military service members

    Directory of Open Access Journals (Sweden)

    Krista B. Highland

    2015-01-01

    Full Text Available The development of PTSD after military deployment is influenced by a combination of biopsychosocial risk and resilience factors. In particular, physiological factors may mark risk for symptom progression or resiliency. Research in civilian populations suggests elevated catecholamines after trauma are associated with PTSD months following the trauma. However, less is known regarding physiological markers of PTSD resilience among post-deployment service members (SM. We therefore assessed whether catecholamines obtained shortly after deployment were associated with combat-related PTSD symptoms three months later. Eighty-seven SMs completed the Clinician-Administered PTSD Scale for DSM-IV and blood draws within two months after return from deployment to Iraq or Afghanistan (“Time 1” or “T1” and three months later (“Time 2” or “T2”. Linear regression analyses demonstrated that lower norepinephrine at T1 was associated with lower PTSD symptoms at T2. In particular, T1 norepinephrine was positively associated with T2 symptom intensity and avoidance symptoms. The present findings represent a biologically-informed method of assessing PTSD resilience after deployment, which may aid clinicians in providing tailored treatments for those in the greatest need. Further research is needed to validate these findings and incorporate physiological measures within an assessment battery.

  8. Packaging, deployment, and panel design concepts for a truss-stiffened 7-panel precision deployable reflector with feed boom

    Science.gov (United States)

    Heard, Walter L., Jr.; Collins, Timothy J.; Dyess, James W.; Kenner, Scott; Bush, Harold G.

    1993-01-01

    A concept is presented for achieving a remotely deployable truss-stiffened reflector consisting of seven integrated sandwich panels that form the reflective surface, and an integrated feed boom. The concept has potential for meeting aperture size and surface precision requirements for some high-frequency microwave remote sensing applications. The packaged reflector/feed boom configuration is a self-contained unit that can be conveniently attached to a spacecraft bus. The package has a cylindrical envelope compatible with typical launch vehicle shrouds. Dynamic behavior of a deployed configuration having a 216-inch focal length and consisting of 80-inch-diameter, two-inch-thick panels is examined through finite-element analysis. Results show that the feed boom and spacecraft bus can have a large impact on the fundamental frequency of the deployed configuration. Two candidate rib-stiffened sandwich panel configurations for this application are described, and analytical results for panel mass and stiffness are presented. Results show that the addition of only a few rib stiffeners, if sufficiently deep, can efficiently improve sandwich panel stiffness.

  9. Reduction of environmental impact by FR cycle deployment

    International Nuclear Information System (INIS)

    Katoh, Atsushi; Nakai, Ryodai

    2005-03-01

    In this report radioactive waste generations in terms of disposal volume or disposal field equivalent, and the radioactive toxicity of HLW are evaluated to clarify the promising nuclear scenario for the sake of realization of sustainable society in 21st century. This analysis was conducted based on the outcomes of the mass flow evaluation tool 'FAMILY-21' which calculates a material balance for TRU in the following scenarios. 1) LWR once-through scenario, 2) Pu partly recycling in LWR scenario, 3) Pu full recycling in LWR scenario, 4) FBR deployment scenario, 5) Interim storage scenario. The result shows that the cumulative area of low level radioactive waste (LLW) disposal field at 2150 in the FR cycle deployment scenario is 1.8 times larger than that in the LWR once-through scenario. The area of LLW disposal field at 2150 is a few km 2 in all the scenarios. In contrast, the cumulative area of high level radioactive waste (HLW) disposal field at 2150 in the FR cycle deployment scenario is less than half of that in the LWR once-through scenario. The area of HLW disposal field at 2150 is about 10 times of the area of LLW disposal field. Moreover, the FR deployment reduces the radioactive toxicity of HLW by U/TRU recycling, and shortens the period to decay under the natural Uranium toxicity level. Considering the area of radioactive waste disposal field and the radioactive toxicity of HLW, the advantage of the FR cycle deployment is indicated quantitatively from the viewpoint of the environmental burden reduction. (author)

  10. TQM and lean strategy deployment in Italian hospitals.

    Science.gov (United States)

    Chiarini, Andrea; Baccarani, Claudio

    2016-10-03

    Purpose This paper aims to contribute to the debate concerning total quality management (TQM)-Lean strategy in public healthcare by analyzing the deployment path for implementation, the possible benefits that can be achieved and the encountered pitfalls. Design/methodology/approach Three case studies are drawn from three large Italian hospitals with more than 500 beds each and structured with many departments. The hospitals are located in Tuscany, Italy. These three hospitals have embraced TQM and Lean, starting from strategic objectives and their deployment. At the same time, they have also implemented many TQM-Lean tools. The case studies are based on interviews held with four managers in each of these three public hospitals. Findings Results from the interviews show that there is a specific deployment path for TQM-Lean implementation. The hospitals have also achieved benefits linked to patient satisfaction and improved organizational performances. Problems related to organizational and cultural issues, such as senior managers' commitment, staff management, manufacturing culture and tools adaptation, could affect the benefits. Research limitations/implications The research has been carried out in just three Italian public hospitals. Hence, similar investigations could be managed in other countries. Researchers could also use a larger sample and investigate these issues by means of quantitative inquiry. Practical implications Practitioners could try to apply the deployment path revealed by these case studies in other public and private hospitals. Originality/value The results of this research show that there is a specific, new deployment path for implementing TQM-Lean strategy in some public hospitals.

  11. University of Cambridge deploys Procket Networks' PRO/8801

    CERN Multimedia

    2003-01-01

    Procket Networks, a provider of high performance Internet Protocol (IP) technology and products has announced that the University of Cambridge has deployed the PRO/8801(TM) router into its research network to develop industry-leading deep packet inspection applications. The major application for this deployment is to identify and understand new traffic patterns created by large scale scientific computations and downloads such as the GRID (1 page).

  12. Cloud Environment Automation: from infrastructure deployment to application monitoring

    Science.gov (United States)

    Aiftimiei, C.; Costantini, A.; Bucchi, R.; Italiano, A.; Michelotto, D.; Panella, M.; Pergolesi, M.; Saletta, M.; Traldi, S.; Vistoli, C.; Zizzi, G.; Salomoni, D.

    2017-10-01

    The potential offered by the cloud paradigm is often limited by technical issues, rules and regulations. In particular, the activities related to the design and deployment of the Infrastructure as a Service (IaaS) cloud layer can be difficult to apply and time-consuming for the infrastructure maintainers. In this paper the research activity, carried out during the Open City Platform (OCP) research project [1], aimed at designing and developing an automatic tool for cloud-based IaaS deployment is presented. Open City Platform is an industrial research project funded by the Italian Ministry of University and Research (MIUR), started in 2014. It intends to research, develop and test new technological solutions open, interoperable and usable on-demand in the field of Cloud Computing, along with new sustainable organizational models that can be deployed for and adopted by the Public Administrations (PA). The presented work and the related outcomes are aimed at simplifying the deployment and maintenance of a complete IaaS cloud-based infrastructure.

  13. Spacecraft on-orbit deployment anomalies - What can be done?

    Science.gov (United States)

    Freeman, Michael T.

    1993-04-01

    Modern communications satellites rely heavily upon deployable appendage (i.e. solar arrays, communications antennas, etc.) to perform vital functions that enable the spacecraft to effectively conduct mission objectives. Communications and telemetry antennas provide the radiofrequency link between the spacecraft and the earth ground station, permitting data to be transmitted and received from the satellite. Solar arrays serve as the principle source of electrical energy to the satellite, and recharge internal batteries during operation. However, since satellites cannot carry backup systems, if a solar array fails to deploy, the mission is lost. This article examines the subject of on-orbit anomalies related to the deployment of spacecraft appendage, and possible causes of such failures. Topics discussed shall include mechanical launch loading, on-orbit thermal and solar concerns, reliability of spacecraft pyrotechnics, and practical limitations of ground-based deployment testing. Of particular significance, the article will feature an in-depth look at the lessons learned from the successful recovery of the Telesat Canada Anik-E2 satellite in 1991.

  14. Perceptions of Individual and Family Functioning Among Deployed Female National Guard Members.

    Science.gov (United States)

    Kelly, Patricia J; Cheng, An-Lin; Berkel, LaVerne A; Nilsson, Johanna

    2016-08-01

    Females currently make up 15% of U.S. military service members. Minimal attention has been paid to families of female National Guard members who have been deployed and their subsequent reintegration challenges. This cross-sectional Internet-based survey of female members of four National Guard units compared those who were and were not deployed. Instruments, guided by the variables of the Family Resilience Model, measured individual, family, and deployment-related factors. Bivariate analysis and ordinal logistic regression were done to assess differences between the groups. Of the 239 National Guard members surveyed, deployed women (n = 164) had significantly higher levels of posttraumatic stress disorder (PTSD; p family functioning were higher among deployed when compared with never deployed women. Results indicate community interventions that focus on strengthening coping skills of female Guard members would be useful for this population. © The Author(s) 2016.

  15. Deployment of SIP in MANET: challenges and circumvention

    Directory of Open Access Journals (Sweden)

    Abdelhamid Salma R.

    2017-01-01

    Full Text Available The immense growth in wireless network applications has encouraged the researchers to enhance and propose new approaches that facilitate the deployment of the widely used services, protocols, and applications of the wired networking area in the wireless networks. Among which, the Session Initiation Protocol (SIP is a signaling protocol that allows the establishment of multimedia sessions and calls between different parties. SIP functionality totally depends on a centralized infrastructure, and complexity arises when deploying such a protocol in a special type of wireless networks, namely Mobile Ad-hoc Networks (MANET, due to the absence of a centralized infrastructure, and the dynamic topology of the later. This paper highlights the the challenges arising when deploying SIP in MANETs and presents an overview of different proposed approaches to overcome these challenges.

  16. Effects of Long-Term Stowage on the Deployment of Bistable Tape Springs

    OpenAIRE

    Brinkmeyer, Alex; Pellegrino, Sergio; Weaver, Paul M.

    2016-01-01

    In the context of strain-energy-deployed space structures, material relaxation effects play a significant role in structures that are stowed for long durations, for example, in a space vehicle prior to launch. Here, the deployment of an ultrathin carbon fiber reinforced plastic (CFRP) tape spring is studied, with the aim of understanding how long-duration stowage affects its deployment behavior. Analytical modeling and experiments show that the deployment time increases predictably with stowa...

  17. Mars entry-to-landing trajectory optimization and closed loop guidance

    Science.gov (United States)

    Ilgen, Marc R.; Manning, Raymund A.; Cruz, Manuel I.

    1991-01-01

    The guidance strategy of the Mars Rover Sample Return mission is presented in detail. Aeromaneuver versus aerobrake trades are examined, and an aerobrake analysis is presented which takes into account targeting, guidance, flight control, trajectory profile, delivery accuracy. An aeromaneuver analysis is given which includes the entry corridor, maneuver footprint, guidance, preentry phase, constant drag phase, equilibrium guide phase, variable drag phase, influence of trajectory profile on the entry flight loads, parachute deployment conditions and strategies, and landing accuracy. The Mars terminal descent phase is analyzed.

  18. Deployment of a pentagonal hollow-rope tensegrity module

    OpenAIRE

    Rhode-Barbarigos , Landolf; Bel Hadj Ali , Nizar; Motro , René; Smith , Ian F.C.

    2011-01-01

    International audience; Tensegrity structures are spatial reticulated structures composed of cables and struts. Tensegrity systems are good candidates for adaptive and deployable structures and thus have applications in various engineering fields. A "hollow-rope" tensegrity system composed of tensegrity-ring modules has been demonstrated by the authors to be a viable system for a pedestrian bridge. This paper focuses on the deployment of pentagonal ring modules. A geometric study is performed...

  19. 50 CFR 635.21 - Gear operation and deployment restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Gear operation and deployment restrictions....21 Gear operation and deployment restrictions. Link to an amendment published at 75 FR 57701, Sept. 22, 2010. The green-stick gear authorization requirements under paragraphs (c)(2)(v)(A), (c)(2)(v)(B...

  20. FBR/VHTR deployment scenarios in Japan

    International Nuclear Information System (INIS)

    Richards, Matt; Kunitomi, Kazuhiko

    2008-01-01

    Co-deployment of Fast Breeder Reactors (FBRs) and Very High Temperature Reactors (VHTRs) can be used as the nuclear technologies to meet a significant portion of Japan's future energy demands. The FBR provides the fissile fuel for energy security and sustainability, and can be used to provide a significant portion of the electricity demand. The VHTR can provide flexible energy outputs (electricity, hydrogen, and high-temperature heat) with high efficiency, can operate with a wide variety of fuel cycles, and can be sited at locations that have limited availability of cooling water. These features, combined with its passive safety and high degree of proliferation resistance, make the VHTR an ideal complement for co-deployment with the FBR in Japan and also a very low-risk technology of export to foreign countries. In addition to hydrogen production, the high-temperature thermal energy produced by the VHTR fleet can be used for a wide variety of process-heat applications, and the VHTR can play a key role for significantly reducing greenhouse-gas emissions. This paper describes assessments for deploying FBRs and VHTRs in Japan using a closed fuel cycle, with the FBRs supplying the fissile material to sustain the combined FBR/VHTR fleet. (author)

  1. Logistics analysis to Improve Deployability (LOG-AID): Field Experiment/Results

    National Research Council Canada - National Science Library

    Evers, Kenneth

    2000-01-01

    .... Under sponsorship of the Air Force Research Laboratory Logistics Readiness Branch (AFRL/HESR), the Synergy team analyzed the current wing-level deployment process as part of the Logistics Analysis to Improve Deployability (LOG-AID) program...

  2. Histological Diagnoses of Military Personnel Undergoing Lung Biopsy After Deployment to Southwest Asia.

    Science.gov (United States)

    Madar, Cristian S; Lewin-Smith, Michael R; Franks, Teri J; Harley, Russell A; Klaric, John S; Morris, Michael J

    2017-08-01

    The current understanding of associations between lung disease and military deployment to Southwest Asia, including Iraq and Afghanistan, is both controversial and limited. We sought to clarify the relation between military deployment and biopsy-proven lung disease. Retrospective data were analyzed for military personnel with non-neoplastic lung biopsies evaluated at the Armed Forces Institute of Pathology or Joint Pathology Center (January 2005 to December 2012). Of 391 subjects, 137 (35.0%) had deployed to Southwest Asia prior to biopsy. Compared to non-deployed subjects, those deployed were younger (median age 37 vs. 51 years) with higher representation of African Americans (30.0 vs. 16.9%). Deployed patients were more likely diagnosed with non-necrotizing granulomas (OR 2.4). Non-deployed subjects had higher frequency of idiopathic interstitial pneumonias, particularly organizing pneumonia. Prevalence of small airways diseases including constrictive bronchiolitis was low. This study provides a broader understanding of diversity of biopsy-proven non-neoplastic lung disease as it relates to military deployment to Southwest Asia and importantly did not show an increased prevalence of small airway disease to include constrictive bronchiolitis.

  3. Self-Deploying, Composite Habitats, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Cornerstone Research Group, Inc. (CRG), proposes to develop self-deploying, composite structures for lunar habitats, based on CRG's VeritexTM materials. These...

  4. Effects of combat deployment on risky and self-destructive behavior among active duty military personnel.

    Science.gov (United States)

    Thomsen, Cynthia J; Stander, Valerie A; McWhorter, Stephanie K; Rabenhorst, Mandy M; Milner, Joel S

    2011-10-01

    Although research has documented negative effects of combat deployment on mental health, few studies have examined whether deployment increases risky or self-destructive behavior. The present study addressed this issue. In addition, we examined whether deployment effects on risky behavior varied depending on history of pre-deployment risky behavior, and assessed whether psychiatric conditions mediated effects of deployment on risky behavior. In an anonymous survey, active duty members of the U.S. Marine Corps and U.S. Navy (N = 2116) described their deployment experiences and their participation in risky recreational activities, unprotected sex, illegal drug use, self-injurious behavior, and suicide attempts during three time frames (civilian, military pre-deployment, and military post-deployment). Respondents also reported whether they had problems with depression, anxiety, or PTSD during the same three time frames. Results revealed that risky behavior was much more common in civilian than in military life, with personnel who had not deployed, compared to those who had deployed, reporting more risky behavior and more psychiatric problems as civilians. For the current time period, in contrast, personnel who had deployed (versus never deployed) were significantly more likely to report both risky behavior and psychiatric problems. Importantly, deployment was associated with increases in risky behavior only for personnel with a pre-deployment history of engaging in risky behavior. Although psychiatric conditions were associated with higher levels of risky behavior, psychiatric problems did not mediate associations between deployment and risky behavior. Implications for understanding effects of combat deployment on active duty personnel and directions for future research are discussed. Published by Elsevier Ltd.

  5. Development of the Aquarius Antenna Deployment Mechanisms and Spring/Damper Actuator

    Science.gov (United States)

    Johnson, Joel A.

    2008-01-01

    The Aquarius Instrument s large radar reflector dish needed to be stowed for launch, and then deployed on-orbit. The Deployment Subsystem consisted of a cantilevered boom structure and two single-axis hinge mechanisms to accurately deploy and position the reflector dish relative to the radar feed horns. The cantilevered design demanded high stiffness and accuracy from the deployment mechanism at the root of the boom. A preload-generating end-of-travel latch was also required. To largely eliminate the need for control systems, each deployment mechanism was actuated by a passive spring motor with viscous-fluid damping. Tough requirements and adaptation of a heritage actuator to the new application resulted in numerous challenges. Fabrication, assembly, and testing encountered additional problems, though ultimately the system was demonstrated very successfully. This paper revisits the development to highlight which design concepts worked and the many important lessons learned.

  6. Structural realism versus deployment realism: A comparative evaluation.

    Science.gov (United States)

    Lyons, Timothy D

    2016-10-01

    In this paper I challenge and adjudicate between the two positions that have come to prominence in the scientific realism debate: deployment realism and structural realism. I discuss a set of cases from the history of celestial mechanics, including some of the most important successes in the history of science. To the surprise of the deployment realist, these are novel predictive successes toward which theoretical constituents that are now seen to be patently false were genuinely deployed. Exploring the implications for structural realism, I show that the need to accommodate these cases forces our notion of "structure" toward a dramatic depletion of logical content, threatening to render it explanatorily vacuous: the better structuralism fares against these historical examples, in terms of retention, the worse it fares in content and explanatory strength. I conclude by considering recent restrictions that serve to make "structure" more specific. I show however that these refinements will not suffice: the better structuralism fares in specificity and explanatory strength, the worse it fares against history. In light of these case studies, both deployment realism and structural realism are significantly threatened by the very historical challenge they were introduced to answer. Copyright © 2016 Elsevier Ltd. All rights reserved.

  7. Calibration procedure for Slocum glider deployed optical instruments.

    Science.gov (United States)

    Cetinić, Ivona; Toro-Farmer, Gerardo; Ragan, Matthew; Oberg, Carl; Jones, Burton H

    2009-08-31

    Recent developments in the field of the autonomous underwater vehicles allow the wide usage of these platforms as part of scientific experiments, monitoring campaigns and more. The vehicles are often equipped with sensors measuring temperature, conductivity, chlorophyll a fluorescence (Chl a), colored dissolved organic matter (CDOM) fluorescence, phycoerithrin (PE) fluorescence and spectral volume scattering function at 117 degrees, providing users with high resolution, real time data. However, calibration of these instruments can be problematic. Most in situ calibrations are performed by deploying complementary instrument packages or water samplers in the proximity of the glider. Laboratory calibrations of the mounted sensors are difficult due to the placement of the instruments within the body of the vehicle. For the laboratory calibrations of the Slocum glider instruments we developed a small calibration chamber where we can perform precise calibrations of the optical instruments aboard our glider, as well as sensors from other deployment platforms. These procedures enable us to obtain pre- and post-deployment calibrations for optical fluorescence instruments, which may differ due to the biofouling and other physical damage that can occur during long-term glider deployments. We found that biofouling caused significant changes in the calibration scaling factors of fluorescent sensors, suggesting the need for consistent and repetitive calibrations for gliders as proposed in this paper.

  8. Gossamer-1: Mission concept and technology for a controlled deployment of gossamer spacecraft

    Science.gov (United States)

    Seefeldt, Patric; Spietz, Peter; Sproewitz, Tom; Grundmann, Jan Thimo; Hillebrandt, Martin; Hobbie, Catherin; Ruffer, Michael; Straubel, Marco; Tóth, Norbert; Zander, Martin

    2017-01-01

    Gossamer structures for innovative space applications, such as solar sails, require technology that allows their controlled and thereby safe deployment. Before employing such technology for a dedicated science mission, it is desirable, if not necessary, to demonstrate its reliability with a Technology Readiness Level (TRL) of six or higher. The aim of the work presented here is to provide reliable technology that enables the controlled deployment and verification of its functionality with various laboratory tests, thereby qualifying the hardware for a first demonstration in low Earth orbit (LEO). The development was made in the Gossamer-1 project of the German Aerospace Center (DLR). This paper provides an overview of the Gossamer-1 mission and hardware development. The system is designed based on the requirements of a technology demonstration mission. The design rests on a crossed boom configuration with triangular sail segments. Employing engineering models, all aspects of the deployment were tested under ambient environment. Several components were also subjected to environmental qualification testing. An innovative stowing and deployment strategy for a controlled deployment, as well as the designs of the bus system, mechanisms and electronics are described. The tests conducted provide insights into the deployment process and allow a mechanical characterization of that deployment process, in particular the measurement of the deployment forces. Deployment on system level could be successfully demonstrated to be robust and controllable. The deployment technology is on TRL four approaching level five, with a qualification model for environmental testing currently being built.

  9. Remotely deployable aerial inspection using tactile sensors

    Science.gov (United States)

    MacLeod, C. N.; Cao, J.; Pierce, S. G.; Sullivan, J. C.; Pipe, A. G.; Dobie, G.; Summan, R.

    2014-02-01

    For structural monitoring applications, the use of remotely deployable Non-Destructive Evaluation (NDE) inspection platforms offer many advantages, including improved accessibility, greater safety and reduced cost, when compared to traditional manual inspection techniques. The use of such platforms, previously reported by researchers at the University Strathclyde facilitates the potential for rapid scanning of large areas and volumes in hazardous locations. A common problem for both manual and remote deployment approaches lies in the intrinsic stand-off and surface coupling issues of typical NDE probes. The associated complications of these requirements are obviously significantly exacerbated when considering aerial based remote inspection and deployment, resulting in simple visual techniques being the preferred sensor payload. Researchers at Bristol Robotics Laboratory have developed biomimetic tactile sensors modelled on the facial whiskers (vibrissae) of animals such as rats and mice, with the latest sensors actively sweeping their tips across the surface in a back and forth motion. The current work reports on the design and performance of an aerial inspection platform and the suitability of tactile whisking sensors to aerial based surface monitoring applications.

  10. A scope of the problem: Post-deployment reintegration challenges in a National Guard Unit.

    Science.gov (United States)

    Wilcox, Sherrie L; Oh, Hyunsung; Redmond, Sarah A; Chicas, Joseph; Hassan, Anthony M; Lee, Pey-Jiuan; Ell, Kathleen

    2015-01-01

    More Reserve and Guard members have been activated in the past few years than in any other time in history. In addition to the high rates of psychological and behavioral challenges among military personnel, there are other equally important post-deployment reintegration challenges. Post-deployment reintegration challenges are particularly important to Reserve and Guard members, who transition rapidly from civilian-military-civilian. This study aims to describe the scope of challenges that a battalion of National Guard members (NGM) report experiencing after returning from a one-year deployment to Iraq. This article reports data from a sample of 126 NGM who recently returned from a one-year deployment to Iraq. The scope of post-deployment problems at baseline, 3- and 6-month post-deployment are presented. Overall, the rates of post-deployment psychological and behavioral problems were elevated upon returning from deployment and remained fairly constant for up to 6 months post-deployment. Approximately 30% of respondents were unsatisfied with their relationship and upwards of 30% reported family reintegration challenges. Comparisons with similar research and implications for prevention and improvement of post-deployment quality of life are addressed.

  11. Mechanism Design and Testing of a Self-Deploying Structure Using Flexible Composite Tape Springs

    Science.gov (United States)

    Footdale, Joseph N.; Murphey, Thomas W.

    2014-01-01

    The detailed mechanical design of a novel deployable support structure that positions and tensions a membrane optic for space imagining applications is presented. This is a complex three-dimensional deployment using freely deploying rollable composite tape spring booms that become load bearing structural members at full deployment. The deployment tests successfully demonstrate a new architecture based on rolled and freely deployed composite tape spring members that achieve simultaneous deployment without mechanical synchronization. Proper design of the flexible component mounting interface and constraint systems, which were critical in achieving a functioning unit, are described. These flexible composite components have much potential for advancing the state of the art in deployable structures, but have yet to be widely adopted. This paper demonstrates the feasibility and advantages of implementing flexible composite components, including the design details on how to integrate with required traditional mechanisms.

  12. Deployment, Design, and Commercialization of Carbon-Negative Energy Systems

    Science.gov (United States)

    Sanchez, Daniel Lucio

    Climate change mitigation requires gigaton-scale carbon dioxide removal technologies, yet few examples exist beyond niche markets. This dissertation informs large-scale implementation of bioenergy with carbon capture and sequestration (BECCS), a carbon-negative energy technology. It builds on existing literature with a novel focus on deployment, design, commercialization, and communication of BECCS. BECCS, combined with aggressive renewable deployment and fossil emission reductions, can enable a carbon-negative power system in Western North America by 2050, with up to 145% emissions reduction from 1990 levels. BECCS complements other sources of renewable energy, and can be deployed in a manner consistent with regional policies and design considerations. The amount of biomass resource available limits the level of fossil CO2 emissions that can still satisfy carbon emissions caps. Offsets produced by BECCS are more valuable to the power system than the electricity it provides. Implied costs of carbon for BECCS are relatively low ( 75/ton CO2 at scale) for a capital-intensive technology. Optimal scales for BECCS are an order of magnitude larger than proposed scales found in existing literature. Deviations from optimal scaled size have little effect on overall systems costs - suggesting that other factors, including regulatory, political, or logistical considerations, may ultimately have a greater influence on plant size than the techno-economic factors considered. The flexibility of thermochemical conversion enables a viable transition pathway for firms, utilities and governments to achieve net-negative CO 2 emissions in production of electricity and fuels given increasingly stringent climate policy. Primary research, development (R&D), and deployment needs are in large-scale biomass logistics, gasification, gas cleaning, and geological CO2 storage. R&D programs, subsidies, and policy that recognize co-conversion processes can support this pathway to commercialization

  13. The impact of state financial incentives on market deployment of solar technology

    International Nuclear Information System (INIS)

    Sarzynski, Andrea; Larrieu, Jeremy; Shrimali, Gireesh

    2012-01-01

    Many states have adopted financial incentives to encourage market deployment of solar energy technology. This paper employs a cross-sectional time-series approach to evaluate the extent to which state solar financial incentives systematically encouraged market deployment of solar photovoltaic (PV) technology from 1997 to 2009. The results demonstrate that states offering cash incentives such as rebates and grants experienced more extensive and rapid deployment of grid-tied PV technology than states without cash incentives over the study period. The analysis also finds that the presence of state renewable energy portfolio standards and specific solar carve-out provisions within them heavily influenced the market deployment of grid-tied solar PV technology through 2009. - Highlights: ► We evaluate the impact of state financial incentives on solar technology adoption. ► Cash incentives and renewable portfolio standards strongly influenced deployment. ► The impact of cash incentives and RPS grew significantly over time. ► Tax incentives had little systematic effect on solar market deployment.

  14. RadNet Air Quality (Deployable) Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — RadNet Deployable Monitoring is designed to collect radiological and meteorological information and data asset needed to establish the impact of radiation levels on...

  15. Vibration characteristics of a deployable controllable-geometry truss boom

    Science.gov (United States)

    Dorsey, J. T.

    1983-01-01

    An analytical study was made to evaluate changes in the fundamental frequency of a two dimensional cantilevered truss boom at various stages of deployment. The truss could be axially deployed or retracted and undergo a variety of controlled geometry changes by shortening or lengthening the telescoping diagonal members in each bay. Both untapered and tapered versions of the truss boom were modeled and analyzed by using the finite element method. Large reductions in fundamental frequency occurred for both the untapered and tapered trusses when they were uniformly retracted or maneuvered laterally from their fully deployed position. These frequency reductions can be minimized, however, if truss geometries are selected which maintain cantilever root stiffness during truss maneuvers.

  16. 'Post-deployment appraisal' and the relationship with stress and psychological health in Australian veterans.

    Science.gov (United States)

    Wright, Breanna; Forbes, Andrew; Kelsall, Helen; Clarke, David; Ikin, Jill; Sim, Malcolm

    2015-12-01

    Understanding how veterans appraise their post-deployment experiences could provide insight into better assisting their deployment transitions. We aimed to assess the factor structure of positive and negative post-deployment appraisals in Australian veterans and to examine the resultant factors in their relationship with military stress and psychological health. Questions capturing post-deployment attitudes were developed by the researchers in collaboration with veterans. The questions were administered to 1938 veterans and the results factor analysed. The relationships between post-deployment appraisal, military stress and psychological health were examined using Structural Equation Modelling. A three-factor solution was found for the post-deployment appraisal questions; representing personal development, lack of recognition, and appreciation of life and country. Military stress was associated with the three factors and psychological health. The three factors were weakly to moderately associated with psychological health. Mediation between military stress and psychological health by any post-deployment appraisal factor was minimal. Post-deployment appraisal measures three important attitudes and concerns of veterans after deployment. Military stress is associated with the post-deployment appraisal factors. However, the factors did not mediate the relationship between military stress and psychological health. These factors provide insight into how veterans appraise their complex array of post-deployment experiences, and may provide useful in regard to transitions and integration into civilian life.

  17. The Design and Implementation of a Novel Open Source Massive Deployment System

    Directory of Open Access Journals (Sweden)

    Steven J. H. Shiau

    2018-06-01

    Full Text Available The hypervisor and container are emerging cloud computing and fog computing technologies, which enable rapid system deployment. However, both of the technologies depend on the operating system (OS and applications that are installed on the host machines. System deployment is the activity to deliver and install OSs and applications onto computers. Such deployment activities are widely required in the infrastructure of cloud computing, fog computing, high-performance computing clusters, and classrooms of computer education. Albeit the concept of system deployment is not new, traditional solutions cannot support the rapid evolution of open source file systems. Furthermore, existing solutions cannot support the massive deployment of disks in a computer as well as the massive deployment in large-scale computers. To resolve the issue, the authors proposed novel system architecture as well as software that is openly available. The experiments are undertaken by deploying a Linux system to 1 to 30 Universal Serial Bus (USB flash drives in a single machine and to 1 to 32 machines in a network using the software that is being developed in this work. The results have demonstrated the feasibility and efficiency of the proposed work. The relationships between the bus bandwidth, the writing rate of the USB flash drive, and the number of flash drives were also formulated as a govern equation. Performance evaluation and cost savings in comparing to the deployment cases adopting commercial software were also provided for demonstrating the performance enhancement and cost reduction by using the novel deployment system. In general, the proposed architecture and the developed software are highly effective from the aspects of both performance and cost.

  18. High-frequency field-deployable isotope analyzer for hydrological applications

    Science.gov (United States)

    Elena S.F. Berman; Manish Gupta; Chris Gabrielli; Tina Garland; Jeffrey J. McDonnell

    2009-01-01

    A high-frequency, field-deployable liquid water isotope analyzer was developed. The instrument was deployed for 4 contiguous weeks in the H. J. Andrews Experimental Forest Long-term Ecological Research site in western Oregon, where it was used for real-time measurement of the isotope ratios of precipitation and stream water during three large storm events. We were able...

  19. Challenges to Deploy Service Design in Organizations

    DEFF Research Database (Denmark)

    Akasaka, Fumiya; Ohno, Takehiko; Jensen, Mika Yasuoka

    2016-01-01

    More and more companies are applying service design approaches to develop services and products. Not every project, however, has achieved its goals. In many cases, difficulties arise from organizational issues such as organization structure and evaluation system. In this research, we held workshops...... where success and failure factors of service design projects in organization are presented. By analysing the results, we construct a model that explains the “difficulties of deploying the service design approach in organization.” On the basis of the model, this paper discusses the challenges...... to the deployment of the service design approach in organizations....

  20. When Loved Ones Get Deployed

    Science.gov (United States)

    ... different from hearing about conflicts and violence that break out in the world during our own time. If someone you care about is in the military and is deployed for duty, it's natural to worry about their safety. That's especially true if the person is going ...

  1. Automated Deployment of Advanced Controls and Analytics in Buildings

    Science.gov (United States)

    Pritoni, Marco

    Buildings use 40% of primary energy in the US. Recent studies show that developing energy analytics and enhancing control strategies can significantly improve their energy performance. However, the deployment of advanced control software applications has been mostly limited to academic studies. Larger-scale implementations are prevented by the significant engineering time and customization required, due to significant differences among buildings. This study demonstrates how physics-inspired data-driven models can be used to develop portable analytics and control applications for buildings. Specifically, I demonstrate application of these models in all phases of the deployment of advanced controls and analytics in buildings: in the first phase, "Site Preparation and Interface with Legacy Systems" I used models to discover or map relationships among building components, automatically gathering metadata (information about data points) necessary to run the applications. During the second phase: "Application Deployment and Commissioning", models automatically learn system parameters, used for advanced controls and analytics. In the third phase: "Continuous Monitoring and Verification" I utilized models to automatically measure the energy performance of a building that has implemented advanced control strategies. In the conclusions, I discuss future challenges and suggest potential strategies for these innovative control systems to be widely deployed in the market. This dissertation provides useful new tools in terms of procedures, algorithms, and models to facilitate the automation of deployment of advanced controls and analytics and accelerate their wide adoption in buildings.

  2. Deploying Missile Defense: Major Operational Challenges

    National Research Council Canada - National Science Library

    Bunn, M

    2004-01-01

    By October 2004, the United States will have begun initial deployment of a missile defense capability albeit a modest, limited, and not completely proven one to defend the homeland against a limited...

  3. Deployment Analysis of a Simple Tape-Spring Hinge Using Probabilistic Methods

    Science.gov (United States)

    Lyle, Karen H.; Horta, Lucas G.

    2012-01-01

    Acceptance of new deployable structures architectures and concepts requires validated design methods to minimize the expense involved with technology validation flight testing. Deployable concepts for large lightweight spacecraft include booms, antennae, and masts. This paper explores the implementation of probabilistic methods in the design process for the deployment of a strain-energy mechanism, specifically a simple tape-spring hinge. Strain-energy mechanisms are attractive for deployment in very lightweight systems because they do not require the added mass and complexity associated with motors and controllers. However, designers are hesitant to include free deployment, strain-energy mechanisms because of the potential for uncontrolled behavior. In the example presented here, the tapespring cross-sectional dimensions have been varied and a target displacement during deployment has been selected as the design metric. Specifically, the tape-spring should reach the final position in the shortest time with the minimal amount of overshoot and oscillations. Surrogate models have been used to reduce computational expense. Parameter values to achieve the target response have been computed and used to demonstrate the approach. Based on these results, the application of probabilistic methods for design of a tape-spring hinge has shown promise as a means of designing strain-energy components for more complex space concepts.

  4. Deployable and Conformal Planar Micro-Devices: Design and Model Validation

    Directory of Open Access Journals (Sweden)

    Jinda Zhuang

    2014-08-01

    Full Text Available We report a design concept for a deployable planar microdevice and the modeling and experimental validation of its mechanical behavior. The device consists of foldable membranes that are suspended between flexible stems and actuated by push-pull wires. Such a deployable device can be introduced into a region of interest in its compact “collapsed” state and then deployed to conformally cover a large two-dimensional surface area for minimally invasive biomedical operations and other engineering applications. We develop and experimentally validate theoretical models based on the energy minimization approach to examine the conformality and figures of merit of the device. The experimental results obtained using model contact surfaces agree well with the prediction and quantitatively highlight the importance of the membrane bending modulus in controlling surface conformality. The present study establishes an early foundation for the mechanical design of this and related deployable planar microdevice concepts.

  5. Demonstration and Deployment Strategy Workshop: Summary

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-05-01

    This report is based on the proceedings of the U.S. Department of Energy Bioenergy Technologies Office Demonstration and Deployment Strategy Workshop, held on March 12–13, 2014, at Argonne National Laboratory.

  6. A Tabu Search WSN Deployment Method for Monitoring Geographically Irregular Distributed Events

    Directory of Open Access Journals (Sweden)

    2009-03-01

    Full Text Available In this paper, we address the Wireless Sensor Network (WSN deployment issue. We assume that the observed area is characterized by the geographical irregularity of the sensed events. Formally, we consider that each point in the deployment area is associated a differentiated detection probability threshold, which must be satisfied by our deployment method. Our resulting WSN deployment problem is formulated as a Multi-Objectives Optimization problem, which seeks to reduce the gap between the generated events detection probabilities and the required thresholds while minimizing the number of deployed sensors. To overcome the computational complexity of an exact resolution, we propose an original pseudo-random approach based on the Tabu Search heuristic. Simulations show that our proposal achieves better performances than several other approaches proposed in the literature. In the last part of this paper, we generalize the deployment problem by including the wireless communication network connectivity constraint. Thus, we extend our proposal to ensure that the resulting WSN topology is connected even if a sensor communication range takes small values.

  7. A Tabu Search WSN Deployment Method for Monitoring Geographically Irregular Distributed Events.

    Science.gov (United States)

    Aitsaadi, Nadjib; Achir, Nadjib; Boussetta, Khaled; Pujolle, Guy

    2009-01-01

    In this paper, we address the Wireless Sensor Network (WSN) deployment issue. We assume that the observed area is characterized by the geographical irregularity of the sensed events. Formally, we consider that each point in the deployment area is associated a differentiated detection probability threshold, which must be satisfied by our deployment method. Our resulting WSN deployment problem is formulated as a Multi-Objectives Optimization problem, which seeks to reduce the gap between the generated events detection probabilities and the required thresholds while minimizing the number of deployed sensors. To overcome the computational complexity of an exact resolution, we propose an original pseudo-random approach based on the Tabu Search heuristic. Simulations show that our proposal achieves better performances than several other approaches proposed in the literature. In the last part of this paper, we generalize the deployment problem by including the wireless communication network connectivity constraint. Thus, we extend our proposal to ensure that the resulting WSN topology is connected even if a sensor communication range takes small values.

  8. Shape accuracy optimization for cable-rib tension deployable antenna structure with tensioned cables

    Science.gov (United States)

    Liu, Ruiwei; Guo, Hongwei; Liu, Rongqiang; Wang, Hongxiang; Tang, Dewei; Song, Xiaoke

    2017-11-01

    Shape accuracy is of substantial importance in deployable structures as the demand for large-scale deployable structures in various fields, especially in aerospace engineering, increases. The main purpose of this paper is to present a shape accuracy optimization method to find the optimal pretensions for the desired shape of cable-rib tension deployable antenna structure with tensioned cables. First, an analysis model of the deployable structure is established by using finite element method. In this model, geometrical nonlinearity is considered for the cable element and beam element. Flexible deformations of the deployable structure under the action of cable network and tensioned cables are subsequently analyzed separately. Moreover, the influence of pretension of tensioned cables on natural frequencies is studied. Based on the results, a genetic algorithm is used to find a set of reasonable pretension and thus minimize structural deformation under the first natural frequency constraint. Finally, numerical simulations are presented to analyze the deployable structure under two kinds of constraints. Results show that the shape accuracy and natural frequencies of deployable structure can be effectively improved by pretension optimization.

  9. Software, component, and service deployment in computational Grids

    International Nuclear Information System (INIS)

    von Laszewski, G.; Blau, E.; Bletzinger, M.; Gawor, J.; Lane, P.; Martin, S.; Russell, M.

    2002-01-01

    Grids comprise an infrastructure that enables scientists to use a diverse set of distributed remote services and resources as part of complex scientific problem-solving processes. We analyze some of the challenges involved in deploying software and components transparently in Grids. We report on three practical solutions used by the Globus Project. Lessons learned from this experience lead us to believe that it is necessary to support a variety of software and component deployment strategies. These strategies are based on the hosting environment

  10. IRIS. Progress in licensing and toward deployment

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.D.; Kling, C.L.; Cavlina, N.; Grgic, D.

    2006-01-01

    The International Reactor Innovative and Secure (IRIS) is an advanced, integral, light water cooled, pressurized reactor of smaller generating capacity (1000 MWt, or 335 MWe). It is being developed through a strong international partnership by a team lead by Westinghouse and including organizations from 10 countries. The main objective of the project is to offer a simple nuclear power plant with outstanding safety, attractive economics and enhanced proliferation resistance characteristics ready for deployment within the next decade. IRIS embodies the requirements set forth by the recently announced US DOE Global Nuclear Energy Partnership (GNEP) program for worldwide deployment of a smaller-scale reactors and provides a viable bridge to Generation IV reactors. IRIS is designed to address the needs of both developed and emerging markets. Its smaller power level provides deployment flexibility in larger developed markets, and makes it in particular well suited for markets with limited grids or where the annual energy demand growth is moderate. Due to its short construction time and the staggered build option, IRIS significantly reduces the required financing, improves cash flow, and provides a viable solution for economies with limited resources. While based on proven and worldwide accepted LWR technology, IRIS introduces a number of innovative solutions to simplify its design and improve safety and operational characteristics, including the integral primary system and its components, as well as the safety-by-design approach. These features will be tested and demonstrated in a testing program that has been initiated. As its centerpiece, the program will include the integral test facility. Results of this program will support licensing with the US NRC. A multinational licensing is considered to facilitate worldwide deployment. (author)

  11. Nuclear Power Learning and Deployment Rates; Disruption and Global Benefits Forgone

    OpenAIRE

    Peter A. Lang

    2017-01-01

    This paper presents evidence of the disruption of a transition from fossil fuels to nuclear power, and finds the benefits forgone as a consequence are substantial. Learning rates are presented for nuclear power in seven countries, comprising 58% of all power reactors ever built globally. Learning rates and deployment rates changed in the late-1960s and 1970s from rapidly falling costs and accelerating deployment to rapidly rising costs and stalled deployment. Historical nuclear global capacit...

  12. Guam: U.S. Defense Deployments

    Science.gov (United States)

    2013-11-15

    August 8, 2013; Ta Kung Pao, August 12, 2013. 22 Sam Kim, “N. Korea Deploys Medium-Range Missiles, Bolsters Special Forces,” Yonhap, Seoul, February 23...building up its submarine force (both nuclear-powered and diesel-electric). In November 2004, the PLA Navy sent a Han -class nuclear attack submarine

  13. Light Duty Utility Arm deployment in Tank WM-188

    Energy Technology Data Exchange (ETDEWEB)

    Patterson, M.W.

    1999-12-01

    The Light Duty Utility Arm (LDUA) was successfully deployed in Tank WM-188 during February and March of 1999 at the Idaho Nuclear Technology and Engineering Center (INTEC) tank farm at the Idaho National Engineering and Environmental Laboratory. Some equipment problems were identified, but most were indicative of any first time activity. Deployment during cold weather imposed additional equipment risks, but in general, equipment response to the winter conditions was better than expected. Three end effectors were demonstrated during the deployment. All performed as expected, although the limited resolution of the Alternating Current Field Measurement end effector cannot absolutely confirm tank integrity, which is necessary for future tank inspections. Four heel samples were taken with the sampler end effector and a broad spectrum of analyses were performed. A detailed inspection of the tank interior was performed with the High Resolution Stereo Video System end effector. The sample information is proving invaluable to the development of new treatment flowsheets and waste forms. It is expected that the LDUA will be deployed for tank inspections through the next several years to support other Notice of Non-Compliance (NON) Consent Order requirements and several other ongoing initiatives.

  14. Light Duty Utility Arm Deployment in Tank WM-188

    Energy Technology Data Exchange (ETDEWEB)

    Patterson, Michael W

    2000-01-01

    The Light Duty Utility Arm (LDUA) was successfully deployed in Tank WM-188 during February and March of 1999 at the Idaho Nuclear Technology and Engineering Center (INTEC) tank farm at the Idaho National Engineering and Environmental Laboratory. Some equipment problems were identified, but most were indicative of any first time activity. Deployment during cold weather imposed additional equipment risks, but in general, equipment response to the winter conditions was better than expected. Three end effectors were demonstrated during the deployment. All performed as expected, although the limited resolution of the Alternating Current Field Measurement end effector cannot absolutely confirm tank integrity, which is necessary for future tank inspections. Four heel samples were taken with the sampler end effector and a broad spectrum of analyses were performed. A detailed inspection of the tank interior was performed with the High Resolution Stereo Video System end effector. The sample information is proving invaluable to the development of new treatment flowsheets and waste forms. It is expected that the LDUA will be deployed for tank inspections through the next several years to support other Notice of NonCompliance (NON) Consent Order requirements and several other ongoing initiatives.

  15. Modeling and analysis of a large deployable antenna structure

    Science.gov (United States)

    Chu, Zhengrong; Deng, Zongquan; Qi, Xiaozhi; Li, Bing

    2014-02-01

    One kind of large deployable antenna (LDA) structure is proposed by combining a number of basic deployable units in this paper. In order to avoid vibration caused by fast deployment speed of the mechanism, a braking system is used to control the spring-actuated system. Comparisons between the LDA structure and a similar structure used by the large deployable reflector (LDR) indicate that the former has potential for use in antennas with up to 30 m aperture due to its lighter weight. The LDA structure is designed to form a spherical surface found by the least square fitting method so that it can be symmetrical. In this case, the positions of the terminal points in the structure are determined by two principles. A method to calculate the cable network stretched on the LDA structure is developed, which combines the original force density method and the parabolic surface constraint. Genetic algorithm is applied to ensure that each cable reaches a desired tension, which avoids the non-convergence issue effectively. We find that the pattern for the front and rear cable net must be the same when finding the shape of the rear cable net, otherwise anticlastic surface would generate.

  16. Light Duty Utility Arm deployment in Tank WM-188

    International Nuclear Information System (INIS)

    Patterson, M.

    1999-01-01

    The Light Duty Utility Arm (LDUA) was successfully deployed in Tank WM-188 during February and March of 1999 at the Idaho Nuclear Technology and Engineering Center (INTEC) tank farm at the Idaho National Engineering and Environmental Laboratory. Some equipment problems were identified, but most were indicative of any first time activity. Deployment during cold weather imposed additional equipment risks, but in general, equipment response to the winter conditions was better than expected. Three end effectors were demonstrated during the deployment. All performed as expected, although the limited resolution of the Alternating Current Field Measurement end effector cannot absolutely confirm tank integrity, which is necessary for future tank inspections. Four heel samples were taken with the sampler end effector and a broad spectrum of analyses were performed. A detailed inspection of the tank interior was performed with the High Resolution Stereo Video System end effector. The sample information is proving invaluable to the development of new treatment flowsheets and waste forms. It is expected that the LDUA will be deployed for tank inspections through the next several years to support other Notice of Non-Compliance (NON) Consent Order requirements and several other ongoing initiatives

  17. How Have Deployments During the War on Terrorism Affected Reenlistment?

    Science.gov (United States)

    2009-01-01

    Ethiopia, certain areas of Greece, Haiti, Indonesia, Iran, Iraq, Israel, Jordan, Kenya, Kosovo, Kuwait, Kyrgyzstan, Lebanon, Liberia, Malaysia ...deployment is a direct source of utility, as modeled in Chapter Three. Deployment is not simply another form of “work” that takes time away from “ leisure

  18. Implications of a PTC Extension on U.S. Wind Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.; Steinberg, D.; Mendelsohn, M.; Zinaman, O.; James, T.; Porro, G.; Hand, M.; Mai, T.; Logan, J.; Heeter, J.; Bird, L.

    2014-04-01

    This analysis explores the potential effects of wind production tax credit expiration and various extension scenarios on future wind deployment with the Regional Energy Deployment System (ReEDS), a model of the U.S. electricity sector. The analysis does not estimate the potential implications on government tax revenue associated with the PTC. Key findings include: Under a scenario in which the PTC is not extended and all other policies remain unchanged, wind capacity additions are expected to be between 3 and 5 GW per year from 2013-2020; PTC extension options that ramp-down from the current level to zero-credit by year-end 2022 appear to be insufficient to support deployment at the recent historical average; Extending the PTC at its historical level may provide the best opportunity to support deployment consistent with recent levels across a range of potential market conditions; it therefore may also provide the best opportunity to sustain wind power installation and manufacturing sector at current levels.

  19. Optimization Techniques for 3D Graphics Deployment on Mobile Devices

    Science.gov (United States)

    Koskela, Timo; Vatjus-Anttila, Jarkko

    2015-03-01

    3D Internet technologies are becoming essential enablers in many application areas including games, education, collaboration, navigation and social networking. The use of 3D Internet applications with mobile devices provides location-independent access and richer use context, but also performance issues. Therefore, one of the important challenges facing 3D Internet applications is the deployment of 3D graphics on mobile devices. In this article, we present an extensive survey on optimization techniques for 3D graphics deployment on mobile devices and qualitatively analyze the applicability of each technique from the standpoints of visual quality, performance and energy consumption. The analysis focuses on optimization techniques related to data-driven 3D graphics deployment, because it supports off-line use, multi-user interaction, user-created 3D graphics and creation of arbitrary 3D graphics. The outcome of the analysis facilitates the development and deployment of 3D Internet applications on mobile devices and provides guidelines for future research.

  20. Relationships between soldiers' PTSD symptoms and spousal communication during deployment.

    Science.gov (United States)

    Carter, Sarah; Loew, Benjamin; Allen, Elizabeth; Stanley, Scott; Rhoades, Galena; Markman, Howard

    2011-06-01

    Social support, including support from spouses, may buffer against posttraumatic stress disorder (PTSD) symptoms. The current study assessed whether the frequency of spousal communication during a recent deployment, a potentially important source of support for soldiers, was related to postdeployment PTSD symptoms. Data came from 193 married male Army soldiers who returned from military deployment within the past year. For communication modalities conceptualized as delayed (i.e., letters, care packages, and e-mails), greater spousal communication frequency during deployment was associated with lower postdeployment PTSD symptom scores, but only at higher levels of marital satisfaction (p = .009). At lower marital satisfaction, more delayed spousal communication during deployment was associated with more PTSD symptoms (p = .042). For communication modalities conceptualized as interactive (i.e., phone calls, instant messaging, instant messaging with video), the same general direction of effects was seen, but the interaction between communication frequency and marital satisfaction predicting PTSD symptoms did not reach significance. Copyright © 2011 International Society for Traumatic Stress Studies.

  1. The deployment of new energy technologies and the need for local learning

    International Nuclear Information System (INIS)

    Neij, Lena; Heiskanen, Eva; Strupeit, Lars

    2017-01-01

    The objective of this paper is to identify local aspects of technological learning in the deployment of solar photovoltaic (PV), a globally important form of distributed energy technology. We review literature in the economics of innovation and economic geography to identify the need for local learning when adopting new technologies and seek evidence on the local aspects of learning processes in the deployment of new (energy) technologies. The analysis focuses on the empirical evidence of learning processes in PV deployment. Our findings show that learning for PV deployment exhibits characteristics of local learning identified in the innovation literature (tacit knowledge, shared narratives, user relations and learning in interorganizational networks). In addition, we show that competencies in the deployment of PV rely on learning processes that are closely connected to the historically and geographically distinctive characteristics of the built environment. We also find evidence of the significance of proximity in (local) learning, as well as examples of knowledge being codified over time into national and global knowledge flows. We conclude with policy implications that acknowledge the importance of local learning for deployment. - Highlights: • PV deployment exhibits characteristics of local learning. • Some processes of local learning have become codified on a national level. • Based on a proximity in local learning we stress the importance of local policy.

  2. Economics of ALMR deployment

    International Nuclear Information System (INIS)

    Delene, J.G.; Fuller, L.C.; Hudson, C.R.

    1994-01-01

    The Advanced Liquid Metal Reactor (ALMR) has the potential to extend the economic life of the nuclear option and of reducing the number of high level waste repositories which will eventually be needed in an expanding nuclear economy. This paper reports on an analysis which models and evaluates the economics of the use of ALMRs as a component of this country's future electricity generation mix. The ALMR concept has the ability to utilize as fuel the fissile material contained in previously irradiated nuclear fuel (i.e., spent fuel) or from surplus weapons grade material. While not a requirement for the successful deployment of ALMR power plant technology, the reprocessing of spent fuel from light water reactors (LWR) is necessary for any rapid introduction of ALMR power plants. In addition, the reprocessing of LWR spent fuel may reduce the number of high level waste repositories needed in the future by burning the long-lived actinides produced in the fission process. With this study, the relative economics of a number of potential scenarios related to these issues are evaluated. While not encompassing the full range of all possibilities, the cases reported here provide an indication of the potential costs, timings, and relative economic attractiveness of ALMR deployment

  3. Market deployment strategies for photovoltaics: an international review

    International Nuclear Information System (INIS)

    Haas, R.

    2003-01-01

    In the last decade of the 20th century a wide variety of deployment strategies and dissemination programmes for grid-connected PV systems in the built environment has been launched by quite different organizations and institutions. Governmental bodies on national and local levels have launched strategies, as have electric utilities and NGOs. The core objective of this paper is to document and evaluate the most important past and current market deployment strategies for the broader dissemination of grid-connected PV systems in the built environment. (author)

  4. The Deployment Life Study: Longitudinal Analysis of Military Families Across the Deployment Cycle

    Science.gov (United States)

    2016-01-01

    deployment. The 11 events, grouped by type of trauma, are as follows: • combat – engaging in hand-to-hand combat – being physically knocked over...leaving home; missing classes at school because you don’t like your school; missing after-school activities (such as school activities, sports ) because...you don’t feel like participating; missing after-school activities (such as school activi- ties, sports ) because of transportation problems/issues

  5. SATWG networked quality function deployment

    Science.gov (United States)

    Brown, Don

    1992-01-01

    The initiative of this work is to develop a cooperative process for continual evolution of an integrated, time phased avionics technology plan that involves customers, technologists, developers, and managers. This will be accomplished by demonstrating a computer network technology to augment the Quality Function Deployment (QFD). All results are presented in viewgraph format.

  6. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  7. Is Military Deployment a Risk Factor for Maternal Depression?

    Science.gov (United States)

    2013-01-01

    679–684. 39. Quevedo LA, Silva RA, Godoy R, et al. The impact of ma- ternal post - partum depression on the language development of children at 12 months...Naval Health Research Center Is Military Deployment A Risk Factor for Maternal Depression ? Stacie Nguyen Cynthia A. LeardMann Besa Smith...Sylvester Road San Diego, California 92106-3521 Original Articles Is Military Deployment a Risk Factor for Maternal Depression ? Stacie Nguyen, MPH

  8. Daddy's Days Away. A Deployment Activity Book for Parents & Children.

    Science.gov (United States)

    Marine Corps, Washington, DC.

    This booklet grew from an idea that the children of Marines might appreciate some special discussion of their family's separation during deployment. Information is provided for parents to help them express their feelings with their children about the deployment. Outlines of activities to do before leaving are included. Suggestions are given for…

  9. G20 Clean Energy, and Energy Efficiency Deployment and Policy Progress

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    G-20 Clean Energy, and Energy Efficiency Deployment and Policy Progress, a report prepared by the International Energy Agency (IEA) in collaboration with the G-20 Clean Energy and Energy Efficiency Working Group, provides an overview of clean energy and energy efficiency technology deployment and summarises support policies in place across G-20 countries. The report highlights that while clean energy technology deployment has made steady progress and energy efficiency improvements have been made, continued reliance on fossil fuels to meet growth in global energy demand presents a significant challenge. Scaling-up the deployment of renewable energy, in addition to improving end-use efficiency, enhancing the efficiency of fossil fuel based power generation, and supporting the widespread deployment of CCS will, therefore, also be crucial aspects of the transition to a cleaner energy future. Because the G-20 group of countries represent close to 80% of energy-related CO2 emissions, by developing and deploying energy efficiency and clean energy technologies, they are presented with a unique opportunity to make collective progress in transitioning the global energy system. IEA Deputy Executive Director Richard Jones emphasised the importance of G-20 efforts, saying, 'The IEA welcomes this important collaboration with the G-20. Enhanced deployment of clean energy technologies and of energy efficiency improvements offers energy security and environmental benefits. It will also enable cost savings over the medium and long term -- an aspect that is particularly relevant at a time of economic uncertainty. We believe that enhanced policy assessment and analysis, building on this initial report, will enable governments to take more cost effective and efficient policy decisions.' This report was issued on the authority of the IEA Executive Director, it does not necessarily represent the views of IEA Member countries or the G20.

  10. G20 Clean Energy, and Energy Efficiency Deployment and Policy Progress

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    G-20 Clean Energy, and Energy Efficiency Deployment and Policy Progress, a report prepared by the International Energy Agency (IEA) in collaboration with the G-20 Clean Energy and Energy Efficiency Working Group, provides an overview of clean energy and energy efficiency technology deployment and summarises support policies in place across G-20 countries. The report highlights that while clean energy technology deployment has made steady progress and energy efficiency improvements have been made, continued reliance on fossil fuels to meet growth in global energy demand presents a significant challenge. Scaling-up the deployment of renewable energy, in addition to improving end-use efficiency, enhancing the efficiency of fossil fuel based power generation, and supporting the widespread deployment of CCS will, therefore, also be crucial aspects of the transition to a cleaner energy future. Because the G-20 group of countries represent close to 80% of energy-related CO2 emissions, by developing and deploying energy efficiency and clean energy technologies, they are presented with a unique opportunity to make collective progress in transitioning the global energy system. IEA Deputy Executive Director Richard Jones emphasised the importance of G-20 efforts, saying, 'The IEA welcomes this important collaboration with the G-20. Enhanced deployment of clean energy technologies and of energy efficiency improvements offers energy security and environmental benefits. It will also enable cost savings over the medium and long term -- an aspect that is particularly relevant at a time of economic uncertainty. We believe that enhanced policy assessment and analysis, building on this initial report, will enable governments to take more cost effective and efficient policy decisions.' This report was issued on the authority of the IEA Executive Director, it does not necessarily represent the views of IEA Member countries or the G20.

  11. Characterizing spouse/partner depression and alcohol problems over the course of military deployment.

    Science.gov (United States)

    Erbes, Christopher R; Kramer, Mark; Arbisi, Paul A; DeGarmo, David; Polusny, Melissa A

    2017-04-01

    Spouse/partners of military personnel demonstrate elevated levels of distress during military deployments, yet there is insufficient information about courses of adjustment over time. The current study identified trajectories of depression and alcohol use problems and predictors of those trajectories across the deployment cycle. National Guard soldiers (N = 1973) and spouses/intimate partners (N = 1020) completed assessments of risk/protective factors and baseline measures of mental health functioning 2 to 5 months prior to soldiers' 1-year deployments (Time 1) to Kuwait/Iraq in support of Operation New Dawn or Afghanistan in support of Operation Enduring Freedom. Partners' mental health was reassessed at 4 months (Time 2) and 8 months (Time 3) after soldiers deployed, and both spouses/partners and soldiers were reassessed 2-3 months postdeployment (Time 4). Latent class growth modeling of partner depression symptoms over time revealed 4 groups: Resilience (79.9%), Deployment Distress (8.9%), Anticipatory Distress (8.4%), and Post-Deployment Distress (2.7%). Three alcohol misuse trajectories were identified: Resilience (91.3%), Deployment Onset (5.4%), and Deployment Desistance (3.3%). Predeployment predictors of partners' depression symptom trajectories varied by group and included soldier reports of stressors and social support and partner levels of neuroticism, introversion, disconstraint, and reported stressors. Predeployment predictors of alcohol misuse trajectories varied by group, and included soldier levels of alcohol misuse as well as partner neuroticism, disconstraint, and family readiness. Delineating and predicting trajectories of partner adjustment can allow for better targeted interventions toward those most at risk for heightened distress or alcohol problems over the deployment cycle. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  12. Non-deployment factors affecting psychological wellbeing in military personnel: literature review.

    Science.gov (United States)

    Brooks, Samantha K; Greenberg, Neil

    2018-02-01

    Most military mental health research focuses on the impact of deployment-related stress; less is known about how everyday work-related factors affect wellbeing. This systematic narrative literature review aimed to identify non-deployment-related factors contributing to the wellbeing of military personnel. Electronic literature databases were searched and the findings of relevant studies were used to explore non-deployment-related risk and resilience factors. Fifty publications met the inclusion criteria. Determinants of non-deployment stress were identified as: relationships with others (including leadership/supervisory support; social support/cohesion; harassment/discrimination) and role-related stressors (role conflict; commitment and effort-reward imbalance; work overload/job demands; family-related issues/work-life balance; and other factors including control/autonomy, physical work environment and financial strain). Factors positively impacting wellbeing (such as exercise) were also identified. The literature suggests that non-deployment stressors present a significant occupational health hazard in routine military environments and interpersonal relationships at work are of fundamental importance. Findings suggest that in order to protect the wellbeing of personnel and improve performance, military organisations should prioritise strengthening relationships between employees and their supervisors/colleagues. Recommendations for addressing these stressors in British military personnel were developed.

  13. Iron Status of Deployed Military Members

    Science.gov (United States)

    2017-01-04

    ready force Deploy with and care for the warrior Care for all entrusted to our care Nursing Competencies and Practice: Patient outcomes...duties, physical activities, iron intake through diet ). This additional information would improve the ability to determine factors associated with

  14. Community integration after deployment to Afghanistan

    DEFF Research Database (Denmark)

    Karstoft, Karen-Inge; Armour, Cherie; Andersen, Søren B.

    2015-01-01

    OBJECTIVE: In the years following military deployment, soldiers may experience problems integrating into the community. However, little is known about the nature and prevalence of these problems and if they relate to posttraumatic symptomatology. METHODS: In a prospective, longitudinal study...

  15. Assessing Health Outcomes After Environmental Exposures Associated With Open Pit Burning in Deployed US Service Members.

    Science.gov (United States)

    Rohrbeck, Patricia; Hu, Zheng; Mallon, Col Timothy M

    2016-08-01

    This study assessed the long-term health impact of environmental exposures associated with open pit burning in deployed US service members. Two hundred individuals deployed to Balad, Iraq, and Bagram, Afghanistan, with known exposure to open pits, were matched to 200 non-deployed service members. Both cohorts were observed for adverse health outcomes after returning from deployment. Slight increased risks were observed for respiratory diseases in the Bagram cohort (adj RR: 1.259), and for cardiovascular disease in the Balad cohort (adj RR: 1.072), but the findings were not significant. The combined deployed cohort showed lower risks for adverse health outcomes, suggesting a healthy deployer effect. In conclusion, this study did not find significantly increased risks for selected health outcomes after burn pit exposure during deployment among two deployed cohorts compared with a non-deployed cohort.

  16. Dedicated Carrier Deployment in Heterogeneous Networks with Inter-site Carrier Aggregation

    DEFF Research Database (Denmark)

    Wang, Hua; Rosa, Claudio; Pedersen, Klaus I.

    2013-01-01

    the macrocell or the picocell using simple cell range expansion (RE). Extensive system-level simulations have been conducted to investigate the performance gains that can be achieved with inter-site CA under different traffic models and user distributions. Results show that using inter-site CA between......) or picos with dedicated carrier deployment. Collaborative inter-site carrier aggregation (CA) is proposed in scenarios with macro+RRH deployment to make an efficient use of the fragmented spectrum from multiple cells. While in scenarios with macro+pico deployment, UEs can only connect to either...

  17. Energy storage deployment and innovation for the clean energy transition

    Science.gov (United States)

    Kittner, Noah; Lill, Felix; Kammen, Daniel M.

    2017-09-01

    The clean energy transition requires a co-evolution of innovation, investment, and deployment strategies for emerging energy storage technologies. A deeply decarbonized energy system research platform needs materials science advances in battery technology to overcome the intermittency challenges of wind and solar electricity. Simultaneously, policies designed to build market growth and innovation in battery storage may complement cost reductions across a suite of clean energy technologies. Further integration of R&D and deployment of new storage technologies paves a clear route toward cost-effective low-carbon electricity. Here we analyse deployment and innovation using a two-factor model that integrates the value of investment in materials innovation and technology deployment over time from an empirical dataset covering battery storage technology. Complementary advances in battery storage are of utmost importance to decarbonization alongside improvements in renewable electricity sources. We find and chart a viable path to dispatchable US$1 W-1 solar with US$100 kWh-1 battery storage that enables combinations of solar, wind, and storage to compete directly with fossil-based electricity options.

  18. Deployment Models: Towards Eliminating Security Concerns From Cloud Computing

    OpenAIRE

    Zhao, Gansen; Chunming, Rong; Jaatun, Martin Gilje; Sandnes, Frode Eika

    2010-01-01

    Cloud computing has become a popular choice as an alternative to investing new IT systems. When making decisions on adopting cloud computing related solutions, security has always been a major concern. This article summarizes security concerns in cloud computing and proposes five service deployment models to ease these concerns. The proposed models provide different security related features to address different requirements and scenarios and can serve as reference models for deployment. D...

  19. Kundenorientierte Produktentwicklung mit Hilfe von Quality Function Deployment (QFD)

    OpenAIRE

    Schloske, Alexander

    2011-01-01

    Die Produktentwicklung von heute muss in immer kürzeren Zeiträumen kunden- und kostenorientierte Produkte entwickeln. Zur systematischen Unterstützung dieser Aufgabe im Rahmen der Produktentwicklung wird die Methode Quality Function Deployment (QFD) eingesetzt. Die konsequente Umsetzung der Stimme des Kunden in die Sprache des Unternehmens gelingt mit Quality Function Deployment (QFD). Die Methode wertet systematisch Kundenanforderungen an Produkte aus und führt zu innovativen Lösungen, die s...

  20. Moving out of the Laboratory: Deploying Pervasive Technologies in a Hospital

    DEFF Research Database (Denmark)

    Hansen, Thomas Riisgaard; Bardram, Jakob; Søgaard, Mads

    2006-01-01

    The authors deployed a distributed system containing a location-tracking system, a context-awareness system, wall-sized displays, and mobile phones in a Danish hospital's operating ward. This article presents the lessons they learned from deploying these pervasive computing technologies...

  1. Deployment Plan for Small Roving Annulus Inspection Vehicle

    International Nuclear Information System (INIS)

    Minichan, R.

    2002-01-01

    The Small Roving Annulus Inspection Vehicle (SRAIV) is a modified commercially available wall crawler designed to supplement the In-Service Inspection (ISI) of Savannah River Site (SRS) Waste tanks. The SRAIV provides an improved capability to achieve a more complete inspection of the tank walls than existing methods. The SRAIV will be deployed through annulus risers in the tank to gain access to tank walls requiring inspection. The SRAIV will be deployed using a manually operated deployment pole and will be coupled to the wall using permanent magnet wheels. Navigation will be performed from the remote console where pictorial views can be displayed from the on-board cameras. The unit will incorporate multiple UT transducers for traditional weld examination. In addition, a specially developed Tandem Synthetic Aperture Focusing Technique (TSAFT) UT scanning bridge can be attached to provide further investigation of the knuckle region while the vehicle remains on the vertical surface of the tank wall. In summary, the SRAIV will provide features that enhance and expand the capability of the SRS ISI program

  2. Military youth and the deployment cycle: emotional health consequences and recommendations for intervention.

    Science.gov (United States)

    Esposito-Smythers, Christianne; Wolff, Jennifer; Lemmon, Keith M; Bodzy, Mary; Swenson, Rebecca R; Spirito, Anthony

    2011-08-01

    The United States military force includes over 2.2 million volunteer service members. Three out of five service members who are deployed or are preparing for deployment have spouses and/or children. Stressors associated with the deployment cycle can lead to depression, anxiety, and behavior problems in children, as well as psychological distress in the military spouse. Further, the emotional and behavioral health of family members can affect the psychological functioning of the military service member during the deployment and reintegration periods. Despite widespread acknowledgment of the need for emotional and behavioral health services for youth from military families, many professionals in a position to serve them struggle with how to best respond and select appropriate interventions. The purpose of this paper is to provide an empirically based and theoretically informed review to guide service provision and the development of evidence based treatments for military youth in particular. This review includes an overview of stressors associated with the deployment cycle, emotional and behavioral health consequences of deployment on youth and their caretaking parent, and existing preventative and treatment services for youth from military families. It concludes with treatment recommendations for older children and adolescents experiencing emotional and behavioral health symptoms associated with the deployment cycle.

  3. IEA Wind Task 23 Offshore Wind Technology and Deployment. Subtask 1 Experience with Critical Deployment Issues. Final Technical Report

    DEFF Research Database (Denmark)

    Lemming, Jørgen Kjærgaard

    The final report for IEA Wind Task 23, Offshore Wind Energy Technology and Deployment, is made up of two separate reports: Subtask 1: Experience with Critical Deployment Issues and Subtask 2: Offshore Code Comparison Collaborative (OC3). The Subtask 1 report included here provides background...... information and objectives of Task 23. It specifically discusses ecological issues and regulation, electrical system integration and offshore wind, external conditions, and key conclusions for Subtask 1. The Subtask 2 report covers OC3 background information and objectives of the task, OC3 benchmark exercises...... of aero-elastic offshore wind turbine codes, monopile foundation modeling, tripod support structure modeling, and Phase IV results regarding floating wind turbine modeling....

  4. Low Mass Aeroshell Deployment Mechanism, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Cornerstone Research Group Inc. (CRG) will develop new shape memory polymer (SMP) deployment mechanisms for actuating thermal protective systems (TPS) panels to...

  5. Low Mass Aeroshell Deployment Mechanism, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Cornerstone Research Group Inc. (CRG) will develop new shape memory polymer (SMP) deployment mechanisms for actuating thermal protection system (TPS) panels to...

  6. Singular point analysis during rail deployment into vacuum vessel for ITER blanket maintenance

    International Nuclear Information System (INIS)

    Kakudate, Satoshi; Shibanuma, Kiyoshi

    2007-05-01

    Remote maintenance of the ITER blanket composed of about 400 modules in the vessel is required by a maintenance robot due to high gamma radiation of ∼500Gy/h in the vessel. A concept of rail-mounted vehicle manipulator system has been developed to apply to the maintenance of the ITER blanket. The most critical issue of the vehicle manipulator system is the feasibility of the deployment of the articulated rail composed of eight rail links into the donut-shaped vessel without any driving mechanism in the rail. To solve this issue, a new driving mechanism and procedure for the rail deployment has been proposed, taking account of a repeated operation of the multi-rail links deployed in the same kinematical manner. The new driving mechanism, which is deferent from those of a usual 'articulated arm' equipped with actuator in the every joint for movement, is composed of three mechanisms. To assess the feasibility of the kinematics of the articulated rail for rail deployment, a kinematical model composed of three rail links related to a cycle of the repeated operation for rail deployment was considered. The determinant det J' of the Jacobian matrix J' was solved so as to estimate the existence of a singular point of the transformation during rail deployment. As a result, it is found that there is a singular point due to det J'=0. To avoid the singular point of the rail links, a new location of the second driving mechanism and the related rail deployment procedure are proposed. As a result of the rail deployment test based on the new proposal using a full-scale vehicle manipulator system, the respective rail links have been successfully deployed within 6 h less than the target of 8 h in the same manner of the repeated operation under a synchronized cooperation among the three driving mechanisms. It is therefore concluded that the feasibility of the rail deployment of the articulated rail composed of simple structures without any driving mechanism has been demonstrated

  7. Photovoltaic deployment strategy in Japan and the USA-an institutional appraisal

    International Nuclear Information System (INIS)

    Shum, Kwok L.; Watanabe, Chihiro

    2007-01-01

    Photovoltaic (PV) is a renewable energy technology, along side with other modular energy generation technologies such as micro-turbines, fuel cells, etc., which will enable the alternative distributed generation paradigm compared to the incumbent fossil fuel based centralized generation paradigm. Distributed generation utilizing renewable energy resources offers opportunities for significant carbon dioxide and emissions reductions thus contributing solutions to broader climate change issues. Yet, renewable energy technologies like PV face various barriers for their widespread adoption. Aside from technical and cost issues, renewable technologies have to overcome the so-called carbon lock-in effects. This refers to the techno-institutional complex associated with the fossil-fuel based centralized generation regime that currently dominates energy production and use. Governmental interventions to address these issues usually can be seen as composed of research, development, demonstration and deployment or RD3 [PCAST, 1999. Panel on International Cooperation in Energy Research, Development, Demonstration, and Deployment]. This paper focused on comparing the deployment aspect of PV technology in Japan and the USA. While both governments promoted PV as part of their larger strategies to address various environmental and energy security issues, Japan has built a PV installation capacity three times that of the USA as of December 2003 with over 90% of PV installation in the grid-connected small residential system category. This is in marked contrast to the case in the USA in which the cumulative installation is spilt among different types of applications involving the grid and off the grid. We put forward two models to explain these differences in deployment strategies and their possible consequences. The first deployment model leverages upon PV as a manufactured technology with minimal customization to achieve massive deployment. The second deployment model leverages upon

  8. Non-Power Purchase Agreement (PPA) Options for Financing Solar Deployment at Universities

    Energy Technology Data Exchange (ETDEWEB)

    2016-10-01

    Financing solar using power purchase agreements (PPAs) has facilitated solar deployment of more than 100 megawatts (MW) at universities--as compared to 50 MW facilitated by financing models not using PPAs. This brochure, which overviews existing financing models and funding mechanisms available for solar procurement, focuses on non-PPA financing models. For more information on solar deployment at universities using PPAs, refer to Using Power Purchase Agreements for Solar Deployment at Universities.

  9. Market and policy barriers to energy storage deployment :

    Energy Technology Data Exchange (ETDEWEB)

    Bhatnagar, Dhruv; Currier, Aileen B.; Hernandez, Jacquelynne; Ma, Ookie; Kirby, Brendan

    2013-09-01

    Electric energy storage technologies have recently been in the spotlight, discussed as essential grid assets that can provide services to increase the reliability and resiliency of the grid, including furthering the integration of variable renewable energy resources. Though they can provide numerous grid services, there are a number of factors that restrict their current deployment. The most significant barrier to deployment is high capital costs, though several recent deployments indicate that capital costs are decreasing and energy storage may be the preferred economic alternative in certain situations. However, a number of other market and regulatory barriers persist, limiting further deployment. These barriers can be categorized into regulatory barriers, market (economic) barriers, utility and developer business model barriers, crosscutting barriers and technology barriers. This report, through interviews with stakeholders and review of regulatory filings in four regions roughly representative of the United States, identifies the key barriers restricting further energy storage development in the country. The report also includes a discussion of possible solutions to address these barriers and a review of initiatives around the country at the federal, regional and state levels that are addressing some of these issues. Energy storage could have a key role to play in the future grid, but market and regulatory issues have to be addressed to allow storage resources open market access and compensation for the services they are capable of providing. Progress has been made in this effort, but much remains to be done and will require continued engagement from regulators, policy makers, market operators, utilities, developers and manufacturers.

  10. The mental health of deployed UK maritime forces.

    Science.gov (United States)

    Whybrow, Dean; Jones, Norman; Evans, Charlotte; Minshall, Darren; Smith, Darren; Greenberg, Neil

    2016-02-01

    To establish the level of psychological symptoms and the risk factors for possible decreased mental health among deployed UK maritime forces. A survey was completed by deployed Royal Navy (RN) personnel which measured the prevalence of common mental disorder (CMD), post-traumatic stress disorder (PTSD) and potential alcohol misuse. Military and operational characteristics were also measured including exposure to potentially traumatic events, problems occurring at home during the deployment, unit cohesion, leadership and morale. Associations between variables of interest were identified using binary logistic regression to generate ORs and 95% CIs adjusted for a range of potential confounding variables. In total, 41.2% (n=572/1387) of respondents reported probable CMD, 7.8% (n=109/1389) probable PTSD and 17.4% (n=242/1387) potentially harmful alcohol use. Lower morale, cohesion, leadership and problems at home were associated with CMD; lower morale, leadership, problems at home and exposure to potentially traumatic events were associated with probable PTSD; working in ships with a smaller crew size was associated with potentially harmful alcohol use. CMD and PTSD were more frequently reported in the maritime environment than during recent land-based deployments. Rates of potentially harmful alcohol use have reduced but remain higher than the wider military. Experiencing problems at home and exposure to potentially traumatic events were associated with experiencing poorer mental health; higher morale, cohesion and better leadership with fewer psychological symptoms. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  11. Smart Brix—a continuous evolution framework for container application deployments

    Directory of Open Access Journals (Sweden)

    Johannes M. Schleicher

    2016-06-01

    Full Text Available Container-based application deployments have received significant attention in recent years. Operating system virtualization based on containers as a mechanism to deploy and manage complex, large-scale software systems has become a popular mechanism for application deployment and operation. Packaging application components into self-contained artifacts has brought substantial flexibility to developers and operation teams alike. However, this flexibility comes at a price. Practitioners need to respect numerous constraints ranging from security and compliance requirements, to specific regulatory conditions. Fulfilling these requirements is especially challenging in specialized domains with large numbers of stakeholders. Moreover, the rapidly growing number of container images to be managed due to the introduction of new or updated applications and respective components, leads to significant challenges for container management and adaptation. In this paper, we introduce Smart Brix, a framework for continuous evolution of container application deployments that tackles these challenges. Smart Brix integrates and unifies concepts of continuous integration, runtime monitoring, and operational analytics. Furthermore, it allows practitioners to define generic analytics and compensation pipelines composed of self-assembling processing components to autonomously validate and verify containers to be deployed. We illustrate the feasibility of our approach by evaluating our framework using a case study from the smart city domain. We show that Smart Brix is horizontally scalable and runtime of the implemented analysis and compensation pipelines scales linearly with the number of container application packages.

  12. Deployment, Mental Health Problems, Suicidality, and Use of Mental Health Services Among Military Personnel.

    Science.gov (United States)

    Chu, Carol; Stanley, Ian H; Hom, Melanie A; Lim, Ingrid C; Joiner, Thomas E

    2016-01-01

    Following deployment, soldiers may struggle to cope with the after-effects of combat service and experience increased suicidality. Therefore, connection to mental health services is vital. Research regarding the relationship between deployment, suicidality, and mental health connections has been equivocal, with some studies finding a link between deployment history and mental health outcomes, and others not. The purpose of this study was to examine the effects of military deployment on mental health and service utilization outcomes using a longitudinal design. Deployment history, mental health visits, symptoms of suicidality, and various mental health outcomes were assessed in a sample of 1,566 Army recruiters at study entry and 18-months follow-up. Deployment history was positively associated with mental health visits, number of major depressive episodes, and acquired capability for suicide at baseline; however, no significant relationship between deployment, mental health visits, and any other suicide or mental health-related outcomes emerged at baseline or follow-up. Findings suggest a disconnection from mental health services among military personnel. Implications for treatment and suicide prevention efforts among military personnel are discussed.

  13. Computational modeling of interventions and protective thresholds to prevent disease transmission in deploying populations.

    Science.gov (United States)

    Burgess, Colleen; Peace, Angela; Everett, Rebecca; Allegri, Buena; Garman, Patrick

    2014-01-01

    Military personnel are deployed abroad for missions ranging from humanitarian relief efforts to combat actions; delay or interruption in these activities due to disease transmission can cause operational disruptions, significant economic loss, and stressed or exceeded military medical resources. Deployed troops function in environments favorable to the rapid and efficient transmission of many viruses particularly when levels of protection are suboptimal. When immunity among deployed military populations is low, the risk of vaccine-preventable disease outbreaks increases, impacting troop readiness and achievement of mission objectives. However, targeted vaccination and the optimization of preexisting immunity among deployed populations can decrease the threat of outbreaks among deployed troops. Here we describe methods for the computational modeling of disease transmission to explore how preexisting immunity compares with vaccination at the time of deployment as a means of preventing outbreaks and protecting troops and mission objectives during extended military deployment actions. These methods are illustrated with five modeling case studies for separate diseases common in many parts of the world, to show different approaches required in varying epidemiological settings.

  14. Computational Modeling of Interventions and Protective Thresholds to Prevent Disease Transmission in Deploying Populations

    Directory of Open Access Journals (Sweden)

    Colleen Burgess

    2014-01-01

    Full Text Available Military personnel are deployed abroad for missions ranging from humanitarian relief efforts to combat actions; delay or interruption in these activities due to disease transmission can cause operational disruptions, significant economic loss, and stressed or exceeded military medical resources. Deployed troops function in environments favorable to the rapid and efficient transmission of many viruses particularly when levels of protection are suboptimal. When immunity among deployed military populations is low, the risk of vaccine-preventable disease outbreaks increases, impacting troop readiness and achievement of mission objectives. However, targeted vaccination and the optimization of preexisting immunity among deployed populations can decrease the threat of outbreaks among deployed troops. Here we describe methods for the computational modeling of disease transmission to explore how preexisting immunity compares with vaccination at the time of deployment as a means of preventing outbreaks and protecting troops and mission objectives during extended military deployment actions. These methods are illustrated with five modeling case studies for separate diseases common in many parts of the world, to show different approaches required in varying epidemiological settings.

  15. The Impact of Deployment on Parental, Family and Child Adjustment in Military Families.

    Science.gov (United States)

    Lester, Patricia; Aralis, Hilary; Sinclair, Maegan; Kiff, Cara; Lee, Kyung-Hee; Mustillo, Sarah; Wadsworth, Shelley MacDermid

    2016-12-01

    Since 9/11, military service in the United States has been characterized by wartime deployments and reintegration challenges that contribute to a context of stress for military families. Research indicates the negative impact of wartime deployment on the well being of service members, military spouses, and children. Yet, few studies have considered how parental deployments may affect adjustment in young children and their families. Using deployment records and parent-reported measures from primary caregiving (N = 680) and military (n = 310) parents, we examined the influence of deployment on adjustment in military families with children ages 0-10 years. Greater deployment exposure was related to impaired family functioning and marital instability. Parental depressive and posttraumatic stress symptoms were associated with impairments in social emotional adjustment in young children, increased anxiety in early childhood, and adjustment problems in school-age children. Conversely, parental sensitivity was associated with improved social and emotional outcomes across childhood. These findings provide guidance to developing preventive approaches for military families with young children.

  16. The impact of parental deployment to war on children: the crucial role of parenting.

    Science.gov (United States)

    Gewirtz, Abigail H; Zamirt, Osnat

    2014-01-01

    It is estimated that approximately 2 million children have been affected by military deployment, yet much of what is known about the adjustment of children experiencing a parent's combat deployment has emerged only within the past 5-10 years. The extant literature on associations of parental deployment and children's adjustment is briefly reviewed by child's developmental stage. Applying a family stress model to the literature, we propose that the impact of parental deployment and reintegration on children's adjustment is largely mediated by parenting practices. Extensive developmental literature has demonstrated the importance of parenting for children's resilience in adverse contexts more generally, but not specifically in deployment contexts. We review the sparse literature on parenting in deployed families as well as emerging data on empirically supported parenting interventions for military families. An agenda for future research in this area is proffered.

  17. The Inter-Cell Interference Dilemma in Dense Outdoor Small Cell Deployment

    DEFF Research Database (Denmark)

    Polignano, Michele; Mogensen, Preben; Fotiadis, Panagiotis

    2014-01-01

    The deployment of low-power small cells is envisaged as the main driver to accommodate the mobile broadband traffic growth in cellular networks. Depending on the spatial distribution of the user traffic, a densification of the small cells may be required in confined areas. However, deploying more...... and more cells in given areas may imply an increase of the inter-cell interference among the small cells. This study aims at investigating if the inter-cell interference among outdoor small cells may represent an impairment to the user experience, and evaluates if and in what conditions the interference...... coordination is worthwhile compared to the universal frequency reuse. Results show that the inter-cell interference depends on the small cell deployment in the urban environment (e.g. streets and squares) and on the network load condition. In case of deployment along urban streets, the inter-cell interference...

  18. High-Performance Elastically Self-Deployed Roll-Out Solar Array (ROSA), Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Deployable Space Systems (DSS) has developed an ultra-lightweight elastically self-deployable roll-out solar array (ROSA) structural platform that when combined with...

  19. Office of Civilian Response Deployment Tracking System

    Data.gov (United States)

    US Agency for International Development — The purpose of OCR DTS is to establish, manage and track relevant Civilian Response Corps teams for deployment by sector experience, training, education etc.

  20. Concept of Deployable Network Operations Center (DNOC)

    National Research Council Canada - National Science Library

    Bordetsky, Alex; Thiry, Jeff; Johnson, Shawn

    2005-01-01

    .... The increasing use of expeditionary and special operations forces in ad hoc, dynamic, and tactical environments poses a need for an adaptable, flexible, and responsive deployable network operations center (DNOC...

  1. Deployment of a Grid-based Medical Imaging Application

    CERN Document Server

    Amendolia, S R; Frate, C; Gálvez, J; Hassan, W; Hauer, T; Manset, D; McClatchey, R; Odeh, M; Rogulin, D; Solomonides, T; Warren, R

    2005-01-01

    The MammoGrid project has deployed its Service-Oriented Architecture (SOA)-based Grid application in a real environment comprising actual participating hospitals. The resultant setup is currently being exploited to conduct rigorous in-house tests in the first phase before handing over the setup to the actual clinicians to get their feedback. This paper elaborates the deployment details and the experiences acquired during this phase of the project. Finally the strategy regarding migration to an upcoming middleware from EGEE project will be described. This paper concludes by highlighting some of the potential areas of future work.

  2. Self-deployable mobile sensor networks for on-demand surveillance

    Science.gov (United States)

    Miao, Lidan; Qi, Hairong; Wang, Feiyi

    2005-05-01

    This paper studies two interconnected problems in mobile sensor network deployment, the optimal placement of heterogeneous mobile sensor platforms for cost-efficient and reliable coverage purposes, and the self-organizable deployment. We first develop an optimal placement algorithm based on a "mosaicked technology" such that different types of mobile sensors form a mosaicked pattern uniquely determined by the popularity of different types of sensor nodes. The initial state is assumed to be random. In order to converge to the optimal state, we investigate the swarm intelligence (SI)-based sensor movement strategy, through which the randomly deployed sensors can self-organize themselves to reach the optimal placement state. The proposed algorithm is compared with the random movement and the centralized method using performance metrics such as network coverage, convergence time, and energy consumption. Simulation results are presented to demonstrate the effectiveness of the mosaic placement and the SI-based movement.

  3. Design and end-to-end modelling of a deployable telescope

    Science.gov (United States)

    Dolkens, Dennis; Kuiper, Hans

    2017-09-01

    Deployable optics have the potential of revolutionizing the field of high resolution Earth Observation. By offering the same resolutions as a conventional telescope, while using a much smaller launch volume and mass, the costs of high resolution image data can be brought down drastically. In addition, the technology will ultimately enable resolutions that are currently unattainable due to limitations imposed by the size of launcher fairings. To explore the possibilities and system complexities of a deployable telescope, a concept study was done to design a competitive deployable imager. A deployable telescope was designed for a ground sampling distance of 25 cm from an orbital altitude of 550 km. It offers an angular field of view of 0.6° and has a panchromatic channel as well as four multispectral bands in the visible and near infrared spectrum. The optical design of the telescope is based on an off-axis Korsch Three Mirror Anastigmat. A freeform tertiary mirror is used to ensure a diffraction limited image quality for all channels, while maintaining a compact design. The segmented primary mirror consists of four tapered aperture segments, which can be folded down during launch, while the secondary mirror is mounted on a deployable boom. In its stowed configuration, the telescope fits within a quarter of the volume of a conventional telescope reaching the same resolution. To reach a diffraction limited performance while operating in orbit, the relative position of each individual mirror segment must be controlled to a fraction of a wavelength. Reaching such tolerances with deployable telescope challenging, due to inherent uncertainties in the deployment mechanisms. Adding to the complexity is the fact that the telescope will be operating in a Low Earth Orbit (LEO) where it will be exposed to very dynamic thermal conditions. Therefore, the telescope will be equipped with a robust calibration system. Actuators underneath the primary mirror will be controlled using

  4. Outcomes of AV Fistulas and AV Grafts after Interventional Stent-Graft Deployment in Haemodialysis Patients

    Energy Technology Data Exchange (ETDEWEB)

    Schmelter, Christopher, E-mail: christopher.schmelter@klinikum-ingolstadt.de; Raab, Udo, E-mail: udo.raab@klinikum-ingolstadt.de [Klinikum Ingolstadt, Department of Diagnostic and Interventional Radiology (Germany); Lazarus, Friedrich, E-mail: friedrich.lazarus@klinikum-ingolstadt.de [Klinikum Ingolstadt, Department of Nephrology (Germany); Ruppert, Volker, E-mail: volker.ruppert@klinikum-ingolstadt.de [Klinikum Ingolstadt, Department of Vascular Surgery (Germany); Vorwerk, Dierk, E-mail: dierk.vorwerk@klinikum-ingolstadt.de [Klinikum Ingolstadt, Department of Diagnostic and Interventional Radiology (Germany)

    2015-08-15

    PurposeThe study was designed to assess outcomes of arteriovenous (AV) accesses after interventional stent-graft deployment in haemodialysis patients.Materials and Methods63 haemodialysis patients with 66 AV fistulas and AV grafts were treated by interventional stent-graft deployment from 2006 to 2012 at our hospital. Data of these patients were retrospectively analysed for location of deployed stent-grafts, occurrence and location of (re-)stenosis and (re-)thrombosis. Complex stenosis was the most frequent indication for stent-graft deployment (45.5 %), followed by complications of angioplasty with vessel rupture or dissection (31.8 %).ResultsA high rate of procedural success was achieved (98.5 %). The most frequent location of the deployed stent-graft was the draining vein (66.7 %). Stent-graft deployment was more frequent in AV grafts than in AV fistulas. Primary patency was 45.5 % at 6 month, 31.3 % at 12 month and 19.2 % at 24 month. Primary patency was significantly better for AV fistulas than for AV grafts with deployed stent-grafts. Patency of the deployed stent-graft was much better than overall AV access primary patency with deployed stent-graft. Re-stenosis with thrombosis was the most frequent indication for re-intervention. Most frequent location of re-stenosis was the draining vein (37.1 %), followed by stenosis at the AV access (29.5 %) and the deployed stent-graft (23.5 %).ConclusionRe-stenosis and re-thrombosis remain frequent in AV fistulas and AV grafts in haemodialysis patients despite stent-graft deployment. Re-stenosis of the deployed stent-graft is, only in the minority of the cases, responsible for AV access dysfunction.

  5. Wind-Driven Montgolfiere Balloons for Mars

    Science.gov (United States)

    Jones, Jack A.; Fairbrother, Debora; Lemieux, Aimee; Lachenmeier, Tim; Zubrin, Robert

    2005-01-01

    Solar Montgolfiere balloons, or solar-heated hot air balloons have been evaluated by use on Mars for about 5 years. In the past, JPL has developed thermal models that have been confirmed, as well as developed altitude control systems to allow the balloons to float over the landscape or carry ground sampling instrumentation. Pioneer Astronautics has developed and tested a landing system for Montgolfieres. JPL, together with GSSL. have successfully deployed small Montgolfieres (<15-m diameter) in the earth's stratosphere, where conditions are similar to a Mars deployment. Two larger Montgolfieres failed, however, and a series of larger scale Montgolfieres is now planned using stronger, more uniform polyethylene bilaminate, combined with stress-reducing ripstitch and reduced parachute deceleration velocities. This program, which is presently under way, is a joint effort between JPL, WFF, and GSSL, and is planned for completion in three years.

  6. Towards a theory of PACS deployment: an integrative PACS maturity framework.

    NARCIS (Netherlands)

    Wetering, R. van de; Batenburg, R.

    2014-01-01

    Owing to large financial investments that go along with the picture archiving and communication system (PACS) deployments and inconsistent PACS performance evaluations, there is a pressing need for a better understanding of the implications of PACS deployment in hospitals. We claim that there is a

  7. From a Real Deployment to a Downscaled Testbed : A Methodological Approach

    NARCIS (Netherlands)

    Stajkic, Andrea; Abrignani, Melchiorre Danilo; Buratti, Chiara; Bettinelli, Andrea; Vigo, Daniele; Verdone, Roberto

    2016-01-01

    This paper proposes a novel methodology for the spatial downscaling of real-world deployments of wireless networks, running protocols, and/or applications for the Internet of Things (IoT). These networks are often deployed in environments not easily accessible and highly unpredictable, where doing

  8. Wind deployment in the United States: states, resources, policy, and discourse.

    Science.gov (United States)

    Wilson, Elizabeth J; Stephens, Jennie C

    2009-12-15

    A transformation in the way the United States produces and uses energy is needed to achieve greenhouse gas reduction targets for climate change mitigation. Wind power is an important low-carbon technology and the most rapidly growing renewable energy technology in the U.S. Despite recent advances in wind deployment, significant state-by-state variation in wind power distribution cannot be explained solely by wind resource patterns nor by state policy. Other factors embedded within the state-level socio-political context also contribute to wind deployment patterns. We explore this socio-political context in four U.S. states by integrating multiple research methods. Through comparative state-level analysis of the energy system, energy policy, and public discourse as represented in the media, we examine variation in the context for wind deployment in Massachusetts, Minnesota, Montana, and Texas. Our results demonstrate that these states have different patterns of wind deployment, are engaged in different debates about wind power, and appear to frame the risks and benefits of wind power in different ways. This comparative assessment highlights the complex variation of the state-level socio-political context and contributes depth to our understanding of energy technology deployment processes, decision-making, and outcomes.

  9. The Association Between Suicide and OIF/OEF Deployment History. Addendum

    Science.gov (United States)

    2015-03-01

    Gulliver SB, Morissette SB. Combined PTSD and depressive symptoms interact with post-deployment social support to predict suicidal ideation in Operation... media interest. The fundamental finding that deployment, overall, is not associated with suicide is an important fact that contradicts general... suicide attempts [35], and suicidal ideation [19]. However, there are other studies that do not support an association between PTSD and increased

  10. The role of perceived threat in the emergence of PTSD and depression symptoms during warzone deployment.

    Science.gov (United States)

    Lancaster, Cynthia L; Cobb, Adam R; Lee, Han-Joo; Telch, Michael J

    2016-07-01

    Numerous studies have shown that level of exposure to combat-related stressors is a robust risk factor for posttraumatic stress disorder (PTSD) and depression among military personnel deployed to a warzone. Threat perception of warzone experiences assessed retrospectively has been consistently linked to increased risk for PTSD and depression months or even years after returning from deployment. However, little is known about concurrent relations between perceived threat, deployment stress, and stress-related symptoms during deployment. Using a novel in-theater web-based assessment system, we investigated the unique and joint contribution of threat perception and deployment stressors in predicting the emergence of PTSD and depression symptoms during deployment. Soldiers (N = 150) completed assessments of deployment stressors, perceived threat, PTSD symptoms, and depression symptoms throughout deployment to Iraq. Results revealed that perceived threat potentiated the increase in PTSD symptoms as a result of increases in deployment stressors. In contrast, perceived threat, but not warzone stressors, uniquely predicted depression symptoms. Results highlight the important role of threat perception as a risk marker for the acute experience of depression and PTSD symptoms during deployment. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  11. Keeping engaged during deployment : The interplay between self-efficacy, family support, and threat exposure

    NARCIS (Netherlands)

    Delahaij, R.; Kamphuis, W.; Berg, C.E. van den

    2016-01-01

    This study investigated the importance of 2 resilience resources for service members’ ability to deal with threat during deployment. Military self-efficacy and family support were measured before deployment and related to work engagement and burnout levels of service members during deployment. We

  12. Strategies for Power Line Communications Smart Metering Network Deployment

    Directory of Open Access Journals (Sweden)

    Alberto Sendin

    2014-04-01

    Full Text Available Smart Grids are becoming a reality all over the world. Nowadays, the research efforts for the introduction and deployment of these grids are mainly focused on the development of the field of Smart Metering. This emerging application requires the use of technologies to access the significant number of points of supply (PoS existing in the grid, covering the Low Voltage (LV segment with the lowest possible costs. Power Line Communications (PLC have been extensively used in electricity grids for a variety of purposes and, of late, have been the focus of renewed interest. PLC are really well suited for quick and inexpensive pervasive deployments. However, no LV grid is the same in any electricity company (utility, and the particularities of each grid evolution, architecture, circumstances and materials, makes it a challenge to deploy Smart Metering networks with PLC technologies, with the Smart Grid as an ultimate goal. This paper covers the evolution of Smart Metering networks, together with the evolution of PLC technologies until both worlds have converged to project PLC-enabled Smart Metering networks towards Smart Grid. This paper develops guidelines over a set of strategic aspects of PLC Smart Metering network deployment based on the knowledge gathered on real field; and introduces the future challenges of these networks in their evolution towards the Smart Grid.

  13. Color impact in visual attention deployment considering emotional images

    Science.gov (United States)

    Chamaret, C.

    2012-03-01

    Color is a predominant factor in the human visual attention system. Even if it cannot be sufficient to the global or complete understanding of a scene, it may impact the visual attention deployment. We propose to study the color impact as well as the emotion aspect of pictures regarding the visual attention deployment. An eye-tracking campaign has been conducted involving twenty people watching half pictures of database in full color and the other half of database in grey color. The eye fixations of color and black and white images were highly correlated leading to the question of the integration of such cues in the design of visual attention model. Indeed, the prediction of two state-of-the-art computational models shows similar results for the two color categories. Similarly, the study of saccade amplitude and fixation duration versus time viewing did not bring any significant differences between the two mentioned categories. In addition, spatial coordinates of eye fixations reveal an interesting indicator for investigating the differences of visual attention deployment over time and fixation number. The second factor related to emotion categories shows evidences of emotional inter-categories differences between color and grey eye fixations for passive and positive emotion. The particular aspect associated to this category induces a specific behavior, rather based on high frequencies, where the color components influence the visual attention deployment.

  14. Longitudinal changes in glucocorticoid receptor exon 1F methylation and psychopathology after military deployment.

    Science.gov (United States)

    Schür, R R; Boks, M P; Rutten, B P F; Daskalakis, N P; de Nijs, L; van Zuiden, M; Kavelaars, A; Heijnen, C J; Joëls, M; Kahn, R S; Geuze, E; Vermetten, E; Vinkers, C H

    2017-07-25

    Several cross-sectional studies have demonstrated the relevance of DNA methylation of the glucocorticoid receptor exon 1 F region (GR-1 F ) for trauma-related psychopathology. We conducted a longitudinal study to examine GR-1 F methylation changes over time in relation to trauma exposure and the development of post-deployment psychopathology. GR-1 F methylation (52 loci) was quantified using pyrosequencing in whole blood of 92 military men 1 month before and 6 months after a 4-month deployment period to Afghanistan. GR-1 F methylation overall (mean methylation and the number of methylated loci) and functional methylation (methylation at loci associated with GR exon 1 F expression) measures were examined. We first investigated the effect of exposure to potentially traumatic events during deployment on these measures. Subsequently, changes in GR-1 F methylation were related to changes in mental health problems (total Symptom Checklist-90 score) and posttraumatic stress disorder (PTSD) symptoms (Self-Report Inventory for PTSD). Trauma exposure during deployment was associated with an increase in all methylation measures, but development of mental health problems 6 months after deployment was only significantly associated with an increased functional methylation. Emergence of post-deployment PTSD symptoms was not related to increased functional methylation over time. Pre-deployment methylation levels did not predict post-deployment psychopathology. To our knowledge, this is the first study to prospectively demonstrate trauma-related increases in GR-1 F methylation, and it shows that only increases at specific functionally relevant sites predispose for post-deployment psychopathology.

  15. Organizational Culture and the Deployment of Agile Methods: The Competing Values Model View

    Science.gov (United States)

    Iivari, Juhani; Iivari, Netta

    A number of researchers have identified organizational culture as a factor that potentially affects the deployment of agile systems development methods. Inspired by the study of Iivari and Huisman (2007), which focused on the deployment of traditional systems development methods, the present paper proposes a number of hypotheses about the influence of organizational culture on the deployment of agile methods.

  16. An efficient genetic algorithm for maximum coverage deployment in wireless sensor networks.

    Science.gov (United States)

    Yoon, Yourim; Kim, Yong-Hyuk

    2013-10-01

    Sensor networks have a lot of applications such as battlefield surveillance, environmental monitoring, and industrial diagnostics. Coverage is one of the most important performance metrics for sensor networks since it reflects how well a sensor field is monitored. In this paper, we introduce the maximum coverage deployment problem in wireless sensor networks and analyze the properties of the problem and its solution space. Random deployment is the simplest way to deploy sensor nodes but may cause unbalanced deployment and therefore, we need a more intelligent way for sensor deployment. We found that the phenotype space of the problem is a quotient space of the genotype space in a mathematical view. Based on this property, we propose an efficient genetic algorithm using a novel normalization method. A Monte Carlo method is adopted to design an efficient evaluation function, and its computation time is decreased without loss of solution quality using a method that starts from a small number of random samples and gradually increases the number for subsequent generations. The proposed genetic algorithms could be further improved by combining with a well-designed local search. The performance of the proposed genetic algorithm is shown by a comparative experimental study. When compared with random deployment and existing methods, our genetic algorithm was not only about twice faster, but also showed significant performance improvement in quality.

  17. Weight-Aware Sensor Deployment in Wireless Sensor Networks for Smart Cities

    Directory of Open Access Journals (Sweden)

    Mingshan Xie

    2018-01-01

    Full Text Available During the construction of wireless sensor networks (WSNs for smart cities, a preliminary survey of the relative criticalness within the monitored area can be performed. It is a challenge for deterministic sensor deployment to balance the tradeoff of sensing reliability and cost. In this paper, based on the sensing accuracy of the sensor, we establish a reliability model of the sensing area which is divided into sensing grids, and different weights are allocated to those grids. We employ a practical evaluation criterion using seesaw mapping for determining the weights of sensing grids. We further formulate and solve an optimization problem for maximizing the trust degree of the WSNs. With our proposed method, the efficient deployment of sensors can be realized. Simulation results show that our proposed deployment strategy can achieve higher trust degree with reduced sensor deployment cost and lower number of sensors at a certain miss probability threshold.

  18. Scientific Cluster Deployment and Recovery - Using puppet to simplify cluster management

    Science.gov (United States)

    Hendrix, Val; Benjamin, Doug; Yao, Yushu

    2012-12-01

    Deployment, maintenance and recovery of a scientific cluster, which has complex, specialized services, can be a time consuming task requiring the assistance of Linux system administrators, network engineers as well as domain experts. Universities and small institutions that have a part-time FTE with limited time for and knowledge of the administration of such clusters can be strained by such maintenance tasks. This current work is the result of an effort to maintain a data analysis cluster (DAC) with minimal effort by a local system administrator. The realized benefit is the scientist, who is the local system administrator, is able to focus on the data analysis instead of the intricacies of managing a cluster. Our work provides a cluster deployment and recovery process (CDRP) based on the puppet configuration engine allowing a part-time FTE to easily deploy and recover entire clusters with minimal effort. Puppet is a configuration management system (CMS) used widely in computing centers for the automatic management of resources. Domain experts use Puppet's declarative language to define reusable modules for service configuration and deployment. Our CDRP has three actors: domain experts, a cluster designer and a cluster manager. The domain experts first write the puppet modules for the cluster services. A cluster designer would then define a cluster. This includes the creation of cluster roles, mapping the services to those roles and determining the relationships between the services. Finally, a cluster manager would acquire the resources (machines, networking), enter the cluster input parameters (hostnames, IP addresses) and automatically generate deployment scripts used by puppet to configure it to act as a designated role. In the event of a machine failure, the originally generated deployment scripts along with puppet can be used to easily reconfigure a new machine. The cluster definition produced in our CDRP is an integral part of automating cluster deployment

  19. Role of ENT Surgeon in Managing Battle Trauma During Deployment.

    Science.gov (United States)

    Rajguru, Renu

    2013-01-01

    With technological improvements in body armour and increasing use of improvised explosive devices, it is the injuries to head, face and neck are the cause for maximum fatalities as military personnel are surviving wounds that would have otherwise been fatal. The priorities of battlefield surgical treatment are to save life, eyesight and limbs and then to give the best functional and aesthetic outcome for other wounds. Modern day battlefields pose unique demands on the deployed surgical teams and management of head and neck wounds demands multispecialty approach. Optimal result will depend on teamwork of head and neck trauma management team, which should also include otolaryngologist. Data collected by various deployed HFN surgical teams is studied and quoted in the article to give factual figures. Otorhinolaryngology becomes a crucial sub-speciality in the care of the injured and military otorhinolaryngologists need to be trained and deployed accordingly. The otolaryngologist's clinical knowledge base and surgical domain allows the ENT surgeon to uniquely contribute in response to mass casualty incident. Military planners need to recognize the felt need and respond by deploying teams of specialist head and neck surgeons which should also include otorhinolaryngologists.

  20. Deployable reflector configurations. [for space telescope

    Science.gov (United States)

    Meinel, A. B.; Meinel, M. P.; Woolf, N. J.

    1983-01-01

    Both the theoretical reasons for considering a non-circular format for the Large Deployable Reflector, and a potentially realizable concept for such a device, are discussed. The optimum systems for diffraction limited telescopes with incoherent detection have either a single filled aperture, or two such apertures as an interferometer to synthesize a larger aperture. For a single aperture of limited area, a reflector in the form of a slot can be used to give increased angular resolution. It is shown how a 20 x 8 meter telescope can be configured to fit the Space Shuttle bay, and deployed with relatively simple operations. The relationship between the sunshield design and the inclination of the orbit is discussed. The possible use of the LDR as a basic module to permit the construction of supergiant space telescopes and interferometers both for IR/submm studies and for the entire ultraviolet through mm wave spectral region is discussed.

  1. Hybrid deployable support truss designs for LDR

    Science.gov (United States)

    Hedgepeth, J.

    1988-01-01

    Concepts for a 20-meter diameter Large Deployable Reflector (LDR) deployable truss backup structure, and analytical predictions of its structural characteristics are discussed. The concept shown is referred to as the SIXPAC; It is a combination of the PACTRUSS concept and a single-fold beam, which would make up the desired backup structure. One advantage of retaining the PACTRUSS concept is its packaging density and its capability for synchronous deployment. Various 2-meter hexagonal panel arrangements are possible for this Hybrid PACTRUSS structure depending on the panel-to-structure attachment strategies used. Static analyses of the SIXPAC using various assumptions for truss designs and panel masses of 10 kg sq meters were performed to predict the tip displacement of the structure when supported at the center. The tip displacement ranged from 0.20 to 0.44 mm without the panel mass, and from 0.9 to 3.9 mm with the panel mass (in a 1-g field). The data indicate that the structure can be adequately ground tested to validate its required performance in space, assuming the required performance in space is approximately 100 microns. The static displacement at the tip of the structure when subjected to an angular acceleration of 0.001 rad/sec squared were estimated to range from 0.8 to 7.5 microns, depending on the type of truss elements.

  2. Space Situational Awareness of Large Numbers of Payloads From a Single Deployment

    Science.gov (United States)

    Segerman, A.; Byers, J.; Emmert, J.; Nicholas, A.

    2014-09-01

    The nearly simultaneous deployment of a large number of payloads from a single vehicle presents a new challenge for space object catalog maintenance and space situational awareness (SSA). Following two cubesat deployments last November, it took five weeks to catalog the resulting 64 orbits. The upcoming Kicksat mission will present an even greater SSA challenge, with its deployment of 128 chip-sized picosats. Although all of these deployments are in short-lived orbits, future deployments will inevitably occur at higher altitudes, with a longer term threat of collision with active spacecraft. With such deployments, individual scientific payload operators require rapid precise knowledge of their satellites' locations. Following the first November launch, the cataloguing did not initially associate a payload with each orbit, leaving this to the satellite operators. For short duration missions, the time required to identify an experiment's specific orbit may easily be a large fraction of the spacecraft's lifetime. For a Kicksat-type deployment, present tracking cannot collect enough observations to catalog each small object. The current approach is to treat the chip cloud as a single catalog object. However, the cloud dissipates into multiple subclouds and, ultimately, tiny groups of untrackable chips. One response to this challenge may be to mandate installation of a transponder on each spacecraft. Directional transponder transmission detections could be used as angle observations for orbit cataloguing. Of course, such an approach would only be employable with cooperative spacecraft. In other cases, a probabilistic association approach may be useful, with the goal being to establish the probability of an element being at a given point in space. This would permit more reliable assessment of the probability of collision of active spacecraft with any cloud element. This paper surveys the cataloguing challenges presented by large scale deployments of small spacecraft

  3. Security-by-Experiment: Lessons from Responsible Deployment in Cyberspace.

    Science.gov (United States)

    Pieters, Wolter; Hadžiosmanović, Dina; Dechesne, Francien

    2016-06-01

    Conceiving new technologies as social experiments is a means to discuss responsible deployment of technologies that may have unknown and potentially harmful side-effects. Thus far, the uncertain outcomes addressed in the paradigm of new technologies as social experiments have been mostly safety-related, meaning that potential harm is caused by the design plus accidental events in the environment. In some domains, such as cyberspace, adversarial agents (attackers) may be at least as important when it comes to undesirable effects of deployed technologies. In such cases, conditions for responsible experimentation may need to be implemented differently, as attackers behave strategically rather than probabilistically. In this contribution, we outline how adversarial aspects are already taken into account in technology deployment in the field of cyber security, and what the paradigm of new technologies as social experiments can learn from this. In particular, we show the importance of adversarial roles in social experiments with new technologies.

  4. Supporting Military Families with Young Children throughout the Deployment Lifecycle

    Science.gov (United States)

    2017-10-01

    Traumatic Stress Studies (ISTSS) Conference. Chicago, IL. 2. Kritikos*, T.K. & DeVoe, E.R. Relationship quality of recently deployed military...prevention and family orientation of the study . We continue to have impact on multiple disciplinary areas, including social work, psychology , and public...resilience in Active Duty military families through all phases of the deployment cycle. The study will be conducted in three phases. In phase 1

  5. Problems With Deployment of Multi-Domained, Multi-Homed Mobile Networks

    Science.gov (United States)

    Ivancic, William D.

    2008-01-01

    This document describes numerous problems associated with deployment of multi-homed mobile platforms consisting of multiple networks and traversing large geographical areas. The purpose of this document is to provide insight to real-world deployment issues and provide information to groups that are addressing many issues related to multi-homing, policy-base routing, route optimization and mobile security - particularly those groups within the Internet Engineering Task Force.

  6. Multi-purpose deployer for ITER in-vessel maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang-Hwan, E-mail: Chang-Hwan.CHOI@iter.org [ITER Organization, Route de Vinon-sur-Verdon, 13115 St Paul lez Durance (France); Tesini, Alessandro; Subramanian, Rajendran [ITER Organization, Route de Vinon-sur-Verdon, 13115 St Paul lez Durance (France); Rolfe, Alan; Mills, Simon; Scott, Robin; Froud, Tim; Haist, Bernhard; McCarron, Eddie [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon, OXON (United Kingdom)

    2015-10-15

    Highlights: • ITER RH system called as the multi-purpose deployer (MPD) is introduced. • The MPD performs dust and tritium inventory control, in-service inspection. • The MPD performs leak localization, in-vessel diagnostics maintenance. • The MPD has nine degrees of freedom with a payload capacity up to 2 tons. - Abstract: The multi-purpose deployer (MPD) is a general purpose in-vessel remote handling (RH) system in the ITER RH system. The MPD provides the means for deployment and handling of in-vessel tools or components inside the vacuum vessel (VV) for dust and tritium inventory control, in-service inspection, leak localization, and in-vessel diagnostics. It also supports the operation of blanket first wall maintenance and neutral beam duct liner module maintenance operations. This paper describes the concept design of the MPD. The MPD is a cask based system, i.e. it stays in the hot cell building during the machine operation, and is deployed to the VV using the cask system for the in-vessel operations. The main part of the MPD is the articulated transporter which provides transportation and positioning of the in-vessel tools or components. The articulated transporter has nine degrees of freedom with a payload capacity up to 2 tons. The articulated transporter can cover the whole internal surface of the VV by switching between the four equatorial RH ports. Additionally it can use two non-RH equatorial ports to transfer large tools or components. A concept for in-cask tool exchange is developed which minimizes the cask transportation by allowing the MPD to stay in the VV during the tool exchange.

  7. Connected vehicle pilot deployment program phase 1, safety management plan - Tampa (THEA).

    Science.gov (United States)

    2016-04-01

    This document presents the Safety Management Plan for the THEA Connected Vehicle (CV) Pilot Deployment. The THEA CV Pilot : Deployment goal is to advance and enable safe, interoperable, networked wireless communications among vehicles, the : infrastr...

  8. Sleep quality of German soldiers before, during and after deployment in Afghanistan-a prospective study.

    Science.gov (United States)

    Danker-Hopfe, Heidi; Sauter, Cornelia; Kowalski, Jens T; Kropp, Stefan; Ströhle, Andreas; Wesemann, Ulrich; Zimmermann, Peter L

    2017-06-01

    In this prospective study, subjective sleep quality and excessive daytime sleepiness prior to, during and after deployment of German soldiers in Afghanistan were examined. Sleep quality (Pittsburgh Sleep Quality Index; PSQI) and daytime sleepiness (Epworth Sleepiness Scale; ESS) were assessed in 118 soldiers of the German army, who were deployed in Afghanistan for 6 months (deployment group: DG) and in 146 soldiers of a non-deployed control group (CG) at baseline. Results of the longitudinal analysis are reported, based on assessments conducted prior to, during the deployment and afterwards in the DG, and in the CG in parallel. Sleep quality and daytime sleepiness in the DG were already impaired during the predeployment training phase and remained at that level during the deployment phase, which clearly indicates the need for more attention on sleep in young soldiers, already at this early stage. The percentage of impaired sleepers decreased significantly after deployment. Programmes to teach techniques to improve sleep and reduce stress should be implemented prior to deployment to reduce sleep difficulties and excessive daytime sleepiness and subsequent psychiatric disorders. © 2017 European Sleep Research Society.

  9. CCT deployment considerations

    International Nuclear Information System (INIS)

    Yamagata, B.

    1993-01-01

    The deployment of Clean Coal Technologies (CCT) is discussed by asserting that in the case of commercializing CCT, the government's involvement should not stop at the demonstration gate. Two areas in this regard are described. First, the need for the domestic DOE CCT Program to focus on the domestic deployment of demonstrated technologies, and second, the need to recognize that to participate in the phenomenal growth of international power markets through use of clean coal or advanced coal technologies an aggressive partnering between the government and industry to demonstrate technologies abroad will be required. The Clean Coal Technology Coalition's (CCT) primary mission has been to promote the development and use of CCTs. The CCT is a strong advocate for the DOE CCT Program and applauds the Department's and industry's success at developing many coal-based technologies. By current design, the DOE program is said to go no further than the initial demonstration of a technology. Since the inception of CCT in 1986, the Coalition has advocated the need to pursue a partnership with government in which more than one demonstration of the same or similar technology is supported by the clean coal program. Only in this way can one be assured of widespread acceptance of any given technology. There exists a gap (call it a open-quotes risk gapclose quotes) between CCTs that have been successfully demonstrated (and presumably available for commercial use) and their widespread commercial use. A technology matrix has been developed in which the developmental status of a variety of clean coal technologies is demonstrated. While still too early to pass judgment, it appears that while success is being achieved in demonstrating advanced coal technologies, the market place - for several reasons - is not, indeed may have no plans, to adopt these technologies

  10. Key factors affecting the deployment of electricity generation technologies in energy technology scenarios

    International Nuclear Information System (INIS)

    Ruoss, F.; Turton, H.; Hirschberg, S.

    2009-12-01

    This report presents the findings of a survey of key factors affecting the deployment of electricity generation technologies in selected energy scenarios. The assumptions and results of scenarios, and the different models used in their construction, are compared. Particular attention is given to technology assumptions, such as investment cost or capacity factors, and their impact on technology deployment. We conclude that the deployment of available technologies, i.e. their market shares, can only be explained from a holistic perspective, and that there are strong interactions between driving forces and competing technology options within a certain scenario. Already the design of a scenario analysis has important impacts on the deployment of technologies: the choice of the set of available technologies, the modeling approach and the definition of the storylines determine the outcome. Furthermore, the quantification of these storylines into input parameters and cost assumptions drives technology deployment, even though differences across the scenarios in cost assumptions are not observed to account for many of the observed differences in electricity technology deployment. The deployment can only be understood after a consideration of the interplay of technology options and the scale of technology deployment, which is determined by economic growth, end-use efficiency, and electrification. Some input parameters are of particular importance for certain technologies: CO 2 prices, fuel prices and the availability of carbon capture and storage appear to be crucial for the deployment of fossil-fueled power plants; maximum construction rates and safety concerns determine the market share of nuclear power; the availability of suitable sites represents the most important factor for electricity generation from hydro and wind power plants; and technology breakthroughs are needed for solar photovoltaics to become cost-competitive. Finally, this analysis concludes with a review

  11. Key factors affecting the deployment of electricity generation technologies in energy technology scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Ruoss, F.; Turton, H.; Hirschberg, S.

    2009-12-15

    This report presents the findings of a survey of key factors affecting the deployment of electricity generation technologies in selected energy scenarios. The assumptions and results of scenarios, and the different models used in their construction, are compared. Particular attention is given to technology assumptions, such as investment cost or capacity factors, and their impact on technology deployment. We conclude that the deployment of available technologies, i.e. their market shares, can only be explained from a holistic perspective, and that there are strong interactions between driving forces and competing technology options within a certain scenario. Already the design of a scenario analysis has important impacts on the deployment of technologies: the choice of the set of available technologies, the modeling approach and the definition of the storylines determine the outcome. Furthermore, the quantification of these storylines into input parameters and cost assumptions drives technology deployment, even though differences across the scenarios in cost assumptions are not observed to account for many of the observed differences in electricity technology deployment. The deployment can only be understood after a consideration of the interplay of technology options and the scale of technology deployment, which is determined by economic growth, end-use efficiency, and electrification. Some input parameters are of particular importance for certain technologies: CO{sub 2} prices, fuel prices and the availability of carbon capture and storage appear to be crucial for the deployment of fossil-fueled power plants; maximum construction rates and safety concerns determine the market share of nuclear power; the availability of suitable sites represents the most important factor for electricity generation from hydro and wind power plants; and technology breakthroughs are needed for solar photovoltaics to become cost-competitive. Finally, this analysis concludes with a

  12. Modular VO oriented Java EE service deployer

    Science.gov (United States)

    Molinaro, Marco; Cepparo, Francesco; De Marco, Marco; Knapic, Cristina; Apollo, Pietro; Smareglia, Riccardo

    2014-07-01

    The International Virtual Observatory Alliance (IVOA) has produced many standards and recommendations whose aim is to generate an architecture that starts from astrophysical resources, in a general sense, and ends up in deployed consumable services (that are themselves astrophysical resources). Focusing on the Data Access Layer (DAL) system architecture, that these standards define, in the last years a web based application has been developed and maintained at INAF-OATs IA2 (Italian National institute for Astrophysics - Astronomical Observatory of Trieste, Italian center of Astronomical Archives) to try to deploy and manage multiple VO (Virtual Observatory) services in a uniform way: VO-Dance. However a set of criticalities have arisen since when the VO-Dance idea has been produced, plus some major changes underwent and are undergoing at the IVOA DAL layer (and related standards): this urged IA2 to identify a new solution for its own service layer. Keeping on the basic ideas from VO-Dance (simple service configuration, service instantiation at call time and modularity) while switching to different software technologies (e.g. dismissing Java Reflection in favour of Enterprise Java Bean, EJB, based solution), the new solution has been sketched out and tested for feasibility. Here we present the results originating from this test study. The main constraints for this new project come from various fields. A better homogenized solution rising from IVOA DAL standards: for example the new DALI (Data Access Layer Interface) specification that acts as a common interface system for previous and oncoming access protocols. The need for a modular system where each component is based upon a single VO specification allowing services to rely on common capabilities instead of homogenizing them inside service components directly. The search for a scalable system that takes advantage from distributed systems. The constraints find answer in the adopted solutions hereafter sketched. The

  13. Deployment of the MARSIS Radar Antennas On-Board Mars Express

    Science.gov (United States)

    Denis, Michel; Moorhouse, A.; Smith, A.; McKay, Mike; Fischer, J.; Jayaraman, P.; Mounzer, Z.; Schmidt, R.; Reddy, J.; Ecale, E.; hide

    2006-01-01

    On the first European planetary mission, the deployment of the two 20-meter long MARSIS antennas onboard the ESA Mars Express spacecraft has represented an unprecedented technological challenge, in the middle of a successful science mission. While Mars Express was already performing regular observations at Mars, a complex process has been performed on Earth, involving the ESA Project, coordination between ESA, NASA and ASI, the Mars Science community, the spacecraft manufacturer EADS Astrium and the Mission Control Centre at ESOC. This paper describes the steps that led from an initial nogo in 2004 to deployment one year later, as well as the conditions and difficulties encountered during the actual deployment. It provides insights in the technical and managerial processes that made it a success, and analyses the rationale behind the decisions.

  14. Optimizing small cell deployment by the use of C-RANs

    DEFF Research Database (Denmark)

    Checko, Aleksandra; Holm, Henrik Laumand; Christiansen, Henrik Lehrmann

    2014-01-01

    A Cloud Radio Access Network (C-RAN) is a novel mobile network architecture that has the potential to support extremely dense mobile network deployments enhancing the network capacity while offering cost savings on baseband resources. In this work we analyze cell traffic profiles and evaluate...... the conditions that impact the statistical multiplexing gain in the Baseband Unit (BBU) Pool. We conclude on the set of parameters that maximize the statistical multiplexing gain, leading to the highest potential cost savings. We then propose a packet based architecture that can adapt to changing traffic...... conditions. Furthermore, based on theoretical calculations and Network simulations we present considerations on deployment scenarios to optimize green field deployments in terms of Total Cost of Ownership (TCO). This involves optimizing the mix of cells with different traffic profiles and the BBU Pool...

  15. What explains post-traumatic stress disorder (PTSD) in UK service personnel: deployment or something else?

    Science.gov (United States)

    Jones, M; Sundin, J; Goodwin, L; Hull, L; Fear, N T; Wessely, S; Rona, R J

    2013-08-01

    In previous studies an association between deployment to Iraq or Afghanistan and an overall increased risk for post-traumatic stress disorder (PTSD) in UK armed forces has not been found. The lack of a deployment effect might be explained by including, in the comparison group, personnel deployed on other operations or who have experienced traumatic stressors unrelated to deployment. The sample comprised 8261 regular UK armed forces personnel who deployed to Iraq, Afghanistan or other operational areas or were not deployed. Participants completed the PTSD CheckList-Civilian Version (PCL-C) and provided information about deployment history, demographic and service factors, serious accidents and childhood experiences. Deployment to Iraq or Afghanistan [odds ratio (OR) 1.2, 95% confidence interval (CI) 0.6-2.2] or elsewhere (OR 1.1, 95% CI 0.6-2.0) was unrelated to PTSD although holding a combat role was associated with PTSD if deployed to Iraq or Afghanistan (OR 2.7, 95% CI 1.9-3.9). Childhood adversity (OR 3.3, 95% CI 2.1-5.0), having left service (OR 2.7, 95% CI 1.9-4.0) and serious accident (OR 2.1, 95% CI 1.4-3.0) were associated with PTSD whereas higher rank was protective (OR 0.3, 95% CI 0.12-0.76). For the majority of UK armed forces personnel, deployment whether to Iraq, Afghanistan or elsewhere confers no greater risk for PTSD than service in the armed forces per se but holding a combat role in those deployed to Iraq or Afghanistan is associated with PTSD. Vulnerability factors such as lower rank, childhood adversity and leaving service, and having had a serious accident, may be at least as important as holding a combat role in predicting PTSD in UK armed forces personnel.

  16. Persistent Identifiers for Field Deployments: A Missing Link in the Provenance Chain

    Science.gov (United States)

    Arko, R. A.; Ji, P.; Fils, D.; Shepherd, A.; Chandler, C. L.; Lehnert, K.

    2016-12-01

    Research in the geosciences is characterized by a wide range of complex and costly field deployments including oceanographic cruises, submersible dives, drilling expeditions, seismic networks, geodetic campaigns, moored arrays, aircraft flights, and satellite missions. Each deployment typically produces a mix of sensor and sample data, spanning a period from hours to decades, that ultimately yields a long tail of post-field products and publications. Publishing persistent, citable identifiers for field deployments will facilitate 1) preservation and reuse of the original field data, 2) reproducibility of the resulting publications, and 3) recognition for both the facilities that operate the platforms and the investigators who secure funding for the experiments. In the ocean domain, sharing unique identifiers for field deployments is a familiar practice. For example, the Biological and Chemical Oceanography Data Management Office (BCO-DMO) routinely links datasets to cruise identifiers published by the Rolling Deck to Repository (R2R) program. In recent years, facilities have started to publish formal/persistent identifiers, typically Digital Object Identifiers (DOIs), for field deployments including seismic networks, oceanographic cruises, and moored arrays. For example, the EarthChem Library (ECL) publishes a DOI for each dataset which, if it derived from an oceanographic research cruise on a US vessel, is linked to a DOI for the cruise published by R2R. Work is underway to create similar links for the IODP JOIDES Resolution Science Operator (JRSO) and the Continental Scientific Drilling Coordination Office (CSDCO). We present results and lessons learned including a draft schema for publishing field deployments as DataCite DOI records; current practice for linking these DOIs with related identifiers such as Open Researcher and Contributor IDs (ORCIDs), Open Funder Registry (OFR) codes, and International Geo Sample Numbers (IGSNs); and consideration of other

  17. Military Deployment and Elementary Student Achievement

    Science.gov (United States)

    Phelps, Terri; Dunham, Mardis; Lyons, Robert

    2010-01-01

    This study investigated the impact that military deployment has upon academic achievement of elementary school students. TerraNova test scores of 137 fourth and fifth grade students in two elementary schools with a high proportion of military dependent children were examined for two consecutive years. Although the academic test performance fell…

  18. Promoting parenting to support reintegrating military families: after deployment, adaptive parenting tools.

    Science.gov (United States)

    Gewirtz, Abigail H; Pinna, Keri L M; Hanson, Sheila K; Brockberg, Dustin

    2014-02-01

    The high operational tempo of the current conflicts and the unprecedented reliance on National Guard and Reserve forces highlights the need for services to promote reintegration efforts for those transitioning back to civilian family life. Despite evidence that parenting has significant influence on children's functioning, and that parenting may be impaired during stressful family transitions, there is a dearth of empirically supported psychological interventions tailored for military families reintegrating after deployment. This article reports on the modification of an empirically supported parenting intervention for families in which a parent has deployed to war. A theoretical rationale for addressing parenting during reintegration after deployment is discussed. We describe the intervention, After Deployment, Adaptive Parenting Tools (ADAPT), and report early feasibility and acceptability data from a randomized controlled effectiveness trial of ADAPT, a 14-week group-based, Web-enhanced parenting training program. Among the first 42 families assigned to the intervention group, participation rates were high, and equal among mothers and fathers. Satisfaction was high across all 14 sessions. Implications for psychological services to military families dealing with the deployment process are discussed. PsycINFO Database Record (c) 2014 APA, all rights reserved.

  19. A Multiobjective Fuzzy Inference System based Deployment Strategy for a Distributed Mobile Sensor Network

    Directory of Open Access Journals (Sweden)

    Amol P. Bhondekar

    2010-03-01

    Full Text Available Sensor deployment scheme highly governs the effectiveness of distributed wireless sensor network. Issues such as energy conservation and clustering make the deployment problem much more complex. A multiobjective Fuzzy Inference System based strategy for mobile sensor deployment is presented in this paper. This strategy gives a synergistic combination of energy capacity, clustering and peer-to-peer deployment. Performance of our strategy is evaluated in terms of coverage, uniformity, speed and clustering. Our algorithm is compared against a modified distributed self-spreading algorithm to exhibit better performance.

  20. Military Families: Child Care Support During Deployments

    Science.gov (United States)

    ... temporary caregiver far in advance will make your children feel more secure. Try to have the caregiver connect prior to deployment through visits, phone calls, or social media. If you will be relocating to a family ...

  1. Performance Analysis of Relays in LTE for a Realistic Suburban Deployment Scenario

    DEFF Research Database (Denmark)

    Coletti, Claudio; Mogensen, Preben; Irmer, Ralf

    2011-01-01

    Relays are likely to play an important role in the deployment of Beyond 3G networks, such as LTE-Advanced, thanks to the possibility of effectively extending Macro network coverage and fulfilling the expected high data-rate requirements. Up until now, the relay technology potential and its cost......-effectiveness have been widely investigated in the literature, considering mainly statistical deployment scenarios, like regular networks with uniform traffic distribution. This paper is envisaged to illustrate the performances of different relay technologies (In-Band/Out-band) in a realistic suburban network...... scenario with real Macro site positions, user density map and spectrum band availability. Based on a proposed heuristic deployment algorithm, results show that deploying In-band relays can significantly reduce the user outage if high backhaul link quality is ensured, whereas Out-band relaying and the usage...

  2. Rule-Based vs. Behavior-Based Self-Deployment for Mobile Wireless Sensor Networks.

    Science.gov (United States)

    Urdiales, Cristina; Aguilera, Francisco; González-Parada, Eva; Cano-García, Jose; Sandoval, Francisco

    2016-07-07

    In mobile wireless sensor networks (MWSN), nodes are allowed to move autonomously for deployment. This process is meant: (i) to achieve good coverage; and (ii) to distribute the communication load as homogeneously as possible. Rather than optimizing deployment, reactive algorithms are based on a set of rules or behaviors, so nodes can determine when to move. This paper presents an experimental evaluation of both reactive deployment approaches: rule-based and behavior-based ones. Specifically, we compare a backbone dispersion algorithm with a social potential fields algorithm. Most tests are done under simulation for a large number of nodes in environments with and without obstacles. Results are validated using a small robot network in the real world. Our results show that behavior-based deployment tends to provide better coverage and communication balance, especially for a large number of nodes in areas with obstacles.

  3. Optimal Assignment of Cells in C-RAN Deployments with Multiple BBU Pools

    DEFF Research Database (Denmark)

    Holm, Henrik; Checko, Aleksandra; Al-obaidi, Rami

    2015-01-01

    Cloud Radio Access Network (C-RAN) is receiving increasing attention not only within the research community but also from operators and standardization bodies. However, even a good technology will be deployed only if it is economically viable. In our previous work, for larger scale deployment we...... recommend to divide the area into multiple BBU Pools. In this paper we show how to optimally assign cells to different BBU Pools in such a scenario. By using Integer Linear Programming (ILP) method we derive engineering guidelines for minimizing the CAPital EXpenditure (CAPEX) of C-RAN deployment....

  4. Deployment strategies of managed lanes on arterials.

    Science.gov (United States)

    2015-02-01

    This report investigates issues related to planning, financing, deployment, and operation of managed : lanes on arterials. In this report, a strategy for managed lanes refers to a combination of the managed : lane type, the design and implementation,...

  5. Intelligent quality function deployment system in concurrent engineering environment

    Science.gov (United States)

    Lin, Zhihang; Che, Ada

    1998-10-01

    This paper describes work being undertaken in the development of an intelligent distributed quality function deployment (IDQFD) system, which supports product design team to transfer and deployment the `Voice of Customer' through `House of Quality' into the various stages of product planning, engineering and manufacturing. The requirement modeling of products, the optimization in QFD are indicated. The framework of the system, including QFD tools and platform for distributed collaborative work in QFD, is described. The strategy and methods for the collaboration processing in QFD process are presented. It shows promise for application in practice.

  6. Non-Economic Obstacles to Wind Deployment: Issues and Regional Differences (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.

    2014-05-01

    This presentation provides an overview of national obstacles to wind deployment, with regional assessments. A special mention of offshore projects and distributed wind projects is provided. Detailed maps examine baseline capacity, military and flight radar, golden and bald eagle habitat, bat habitat, whooping crane habitat, and public lands. Regional deployment challenges are also discussed.

  7. Policies to Support Wind Power Deployment: Key Considerations and Good Practices

    Energy Technology Data Exchange (ETDEWEB)

    Cox, Sadie [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tegen, Suzanne [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baring-Gould, Ian [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Oteri, Frank A. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Esterly, Sean [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Forsyth, Trudy [Wind Advisors Team, Golden, CO (United States); Baranowski, Ruth [High Desert Technical Communications LLC, Crestone, CO (United States)

    2015-05-19

    Policies have played an important role in scaling up wind deployment and increasing its economic viability while also supporting country-specific economic, social, and environmental development goals. Although wind power has become cost-competitive in several contexts, challenges to wind power deployment remain. Within the context of country-specific goals and challenges, policymakers are seeking

  8. Task 9. PV deployment in developing countries. Institutional framework and financial instruments for PV deployment in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-15

    This report for the International Energy Agency (IEA) made by Task 9 of the Photovoltaic Power Systems (PVPS) programme takes a look at the institutional framework and financial instruments necessary for PV deployment in developing countries. This guide describes the institutional and financial aspects that need to be addressed to ensure that a long term sustainable (and profitable) PV market is established in developing countries. The guide details main fundamental functions that need to be performed such as the agents needed to perform the functions and their differing roles within the framework, the relationships between these agents and the financial instruments available. It is stated that the majority of the aspects recommended in this guide can be adopted to two main PV deployment models: direct sales and rural electrification and development programmes. It is noted that both approaches will have to be tailored and adapted to local conditions.

  9. Real-life C-RAN deployment considerations

    DEFF Research Database (Denmark)

    Hansen, Line Maria Pyndt; Ruepp, Sarah Renée; Christiansen, Henrik Lehrmann

    2017-01-01

    procedures and best practices for roll out are yet to be established. This work provides a case study, where a small but densely populated part of the network owned by the Danish mobile network operator, TDC, is evaluated for C-RAN deployment. A roadmap is provided which uses traffic data as input...

  10. Optimal and Approximate Approaches for Deployment of Heterogeneous Sensing Devices

    Directory of Open Access Journals (Sweden)

    Rabie Ramadan

    2007-04-01

    Full Text Available A modeling framework for the problem of deploying a set of heterogeneous sensors in a field with time-varying differential surveillance requirements is presented. The problem is formulated as mixed integer mathematical program with the objective to maximize coverage of a given field. Two metaheuristics are used to solve this problem. The first heuristic adopts a genetic algorithm (GA approach while the second heuristic implements a simulated annealing (SA algorithm. A set of experiments is used to illustrate the capabilities of the developed models and to compare their performance. The experiments investigate the effect of parameters related to the size of the sensor deployment problem including number of deployed sensors, size of the monitored field, and length of the monitoring horizon. They also examine several endogenous parameters related to the developed GA and SA algorithms.

  11. Novel large deployable antenna backing structure concepts for foldable reflectors

    Science.gov (United States)

    Fraux, V.; Lawton, M.; Reveles, J. R.; You, Z.

    2013-12-01

    This paper describes a number of large deployable antenna (LDA) reflector structure concepts developed at EnerSys-ABSL. Furthermore, EnerSys-ABSL has confirmed the desire to build a breadboard demonstrator of a backing deployable structure for a foldable reflector in the diameter range of 4-9 m. As part of this project EnerSys-ABSL has explored five novel deployable structure concepts. This paper presents the top level definition of these concepts together with the requirements considered in the design and selection of the preferred candidate. These new concepts are described and then compared through a trade-off analysis to identify the most suitable concept that EnerSys-ABSL would like to consider for the breadboard demonstrator. Finally, the kinematics of the chosen concept is described in more detail and future steps in the development process are highlighted.

  12. Turbo-machine deployment of HTR-10 GT

    International Nuclear Information System (INIS)

    Zhu Shutang; Wang Jie; Zhang Zhengming; Yu Suyuan

    2005-01-01

    As a testing project of gas turbine modular High Temperature Gas-cooled Reactor (HTGR), HTR-10GT has been studied and developed by Institute of Nuclear and New Energy Technology (INET) of Tsinghua University after the success of HTR-10 with steam turbine cycle. The main purposes of this project are to demonstrate the gas turbine modular HTGR, to optimize the deployment of Power Conversion Unit (PCU) and to verify the techniques of turbo-machine, operating modes and controlling measures. HTR-10GT is concentrated on the PCU design and the turbo-machine deployment. Possible turbo-machine deployments have been investigated and two of them are introduced in this paper. The preliminary design for the turbo-machine of HTR-10GT is single-shaft of vertical layout, arranged by the side of the reactor and the turbo-compressor rotary speed was selected to be 250 s -1 (15000 r/min) by considering the efficiency of turbo-compressor blade systems, the strength conditions and the mass and size characteristics of the turbo-compressor. The rotor system will be supported by electromagnetic bearings (EMBs) to curb the possible pollutions of the primary loop. Of all the components in this design, the high speed turbo-generator seems to be a world-wide technical nut. As an alternative design, a gearbox complex is used to reduce the rotary speed from the turbo-compressor 250 s -1 to 50 s -1 so that the ordinary generator can be used. (authors)

  13. View of the deployed INSAT/PAM-D

    Science.gov (United States)

    1983-01-01

    View of the deployed Indian National Satellite (INSAT) attached to Payload Assist Module (PAM) D drifts above the earth's surface. A faint shadow of the open payload bay can be seen in the top left of the frame.

  14. Human Metabolism and Interactions of Deployment-Related Chemicals

    National Research Council Canada - National Science Library

    Hodgson, Ernest

    2003-01-01

    This study examines the human-metabolism and metabolic interactions of a subset of deployment-related chemicals, including chlorpyrifos, DEET, permethrin, pyridostigmine bromide, and sulfur mustard metabolites...

  15. Link Between Deployment Factors and Parenting Stress in Navy Families

    Science.gov (United States)

    2016-04-11

    5a. CONTRACT NUMBER N/A Families 5b. GRANT NUMBER HT9404-13-1-TS05 5c. PROGRAM ELEMENT NUMBER N/A 6. AUTHOR(S) 5d...Purpose: Many service members today are married, and many also have children; deployments affect all members of the military family . The purpose of this...conducted. Findings: As deployment factors increased, parenting stress increased for fathers in the reintegration period, with a potential mediation

  16. Development of corotational formulated FEM for application to 30m class large deployable reflector

    International Nuclear Information System (INIS)

    Ozawa, Satoru; Fujiwara, Yuuichi; Tsujihata, Akio

    2010-01-01

    JAXA, Japan Aerospace Exploration Agency, is now developing a corotational formulated finite element analysis method and its software 'Origami/ETS' for the development of 30m class large deployable reflectors. For the reason that the deployable reflector is composed of beams, cables and mesh, this analysis method is generalized for finite elements with multiple nodes, which are commonly used in linear finite element analyses. The large displacement and rotation are taken into account by the corotational formulation. The tangent stiffness matrix for finite elements with multiple nodes is obtained as follows; the geometric stiffness matrix of two node elements is derived by taking variation of the element's corotational matrix from the virtual work of finite elements with large displacement; similarly the geometric stiffness matrix for three node elements is derived; as the extension of two and three node element theories, the geometric stiffness matrix for multiple node elements is derived; with the geometric stiffness matrix for multiple node elements, the tangent stiffness matrix is obtained. The analysis method is applied for the deployment analysis and static structural analysis of the 30m class large deployable reflector. In the deployment analysis, it is confirmed that this method stably analyzes the deployment motion from the deployment configuration to the stowed configuration of the reflector. In the static analysis, it is confirmed that the mesh structure is analyzed successfully. The 30m class large deployable reflector is now still being developed and is about to undergo several tests with its prototypes. This analysis method will be used in the tests and verifications of the reflector.

  17. Final Technical Report: Commercial Advanced Lighting Control (ALC) Demonstration and Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, Gabe [Efficiency Forward, Inc. / DesignLights Consortium

    2018-02-05

    This three-year demonstration and deployment project sought to address market barriers to accelerating the adoption of Advanced Lighting Controls (ALCs), an underutilized technology with low market penetration. ALCs are defined as networked, addressable lighting control systems that utilize software or intelligent controllers to combine multiple energy-saving lighting control strategies in a single space (e.g., smart-time scheduling, daylight harvesting, task tuning, occupancy control, personal control, variable load-shedding, and plug-load control). The networked intelligent aspect of these systems allows applicable lighting control strategies to be combined in a single space, layered over one another, maximizing overall energy-savings. The project included five real building demonstrations of ALCs across the Northeast US region. The demonstrations provided valuable data and experience to support deployment tasks that are necessary to overcome market barriers. These deployment tasks included development of training resources for building designers, installers, and trades, as well as development of new energy efficiency rebates for the technology from Efficiency Forward’s utility partners. Educating designers, installers, and trades on ALCs is a critical task for reducing the cost of the technology that is currently inflated due to perceived complexity and unfamiliarity with how to design and install the systems. Further, utility and non-utility energy efficiency programs continue to relegate the technology to custom or ill-suited prescriptive program designs that do not effectively deploy the technology at scale. This project developed new, scalable rebate approaches for the technology. Efficiency Forward utilized their DesignLights Consortium® (DLC) brand and network of 81 DLC member utilities to develop and deploy the results of the project. The outputs of the project have included five published case studies, a six-hour ALC technology training curriculum

  18. The role of stress sensitization in progression of posttraumatic distress following deployment

    NARCIS (Netherlands)

    Smid, Geert E.; Kleber, Rolf J.; Rademaker, Arthur R.; van Zuiden, Mirjam; Vermetten, Eric

    2013-01-01

    Military personnel exposed to combat are at risk for experiencing post-traumatic distress that can progress over time following deployment. We hypothesized that progression of post-traumatic distress may be related to enhanced susceptibility to post-deployment stressors. This study aimed at

  19. Hezbollah Rockets and Missiles: Deployment and Defence Programme

    Directory of Open Access Journals (Sweden)

    Ladislav Kulhánek

    2018-01-01

    Full Text Available The paper addresses the issue of the proliferation of the rocket technology deployed in guerrilla warfare throughout the Near East. It evaluates assumptions and identifies potential regressions with respect to the most recent hot phase in the violent conflict between Hezbollah and Israel, with a focus on primary methods based on rocket shelling and resistance efforts. In comparing the two military forces, Israel emerges as the stronger, even if artillery and tactical ballistic missiles with warheads containing substances defined as weapons of mass destruction were to be deployed as an extreme first measure by Hezbollah, in which case an Israeli or American response would destroy at least parts of Lebanon.

  20. A stowing and deployment strategy for large membrane space systems on the example of Gossamer-1

    Science.gov (United States)

    Seefeldt, Patric

    2017-09-01

    Deployment systems for innovative space applications such as solar sails require a technique for a controlled and autonomous deployment in space. The deployment process has a strong impact on the mechanism and structural design and sizing. On the example of the design implemented in the Gossamer-1 project of the German Aerospace Center (DLR), such a stowing and deployment process is analyzed. It is based on a combination of zig-zag folding and coiling of triangular sail segments spanned between crossed booms. The deployment geometry and forces introduced by the mechanism considered are explored in order to reveal how the loads are transferred through the membranes to structural components such as the booms. The folding geometry and force progressions are described by function compositions of an inverse trigonometric function with the considered trigonometric function itself. If these functions are evaluated over several periods of the trigonometric function, a non-smooth oscillating curve occurs. Depending on the trigonometric function, these are often vividly described as zig-zag or sawtooth functions. The developed functions are applied to the Gossamer-1 design. The deployment geometry reveals a tendency that the loads are transferred along the catheti of the sail segments and therefore mainly along the boom axes. The load introduced by the spool deployment mechanism is described. By combining the deployment geometry with that load, a prediction of the deployment load progression is achieved. The mathematical description of the stowing and deployment geometry, as well as the forces inflicted by the mechanism provides an understanding of how exactly the membrane deploys and through which edges the deployment forces are transferred. The mathematical analysis also gives an impression of sensitive parameters that could be influenced by manufacturing tolerances or unsymmetrical deployment of the sail segments. While the mathematical model was applied on the design of

  1. Integrated Model to Assess Cloud Deployment Effectiveness When Developing an IT-strategy

    Science.gov (United States)

    Razumnikov, S.; Prankevich, D.

    2016-04-01

    Developing an IT-strategy of cloud deployment is a complex issue since even the stage of its formation necessitates revealing what applications will be the best possible to meet the requirements of a company business-strategy, evaluate reliability and safety of cloud providers and analyze staff satisfaction. A system of criteria, as well an integrated model to assess cloud deployment effectiveness is offered. The model makes it possible to identify what applications being at the disposal of a company, as well as new tools to be deployed are reliable and safe enough for implementation in the cloud environment. The data on practical use of the procedure to assess cloud deployment effectiveness by a provider of telecommunication services is presented. The model was used to calculate values of integral indexes of services to be assessed, then, ones, meeting the criteria and answering the business-strategy of a company, were selected.

  2. Wireless Sensor Network Deployment for Monitoring Wildlife Passages

    Science.gov (United States)

    Garcia-Sanchez, Antonio-Javier; Garcia-Sanchez, Felipe; Losilla, Fernando; Kulakowski, Pawel; Garcia-Haro, Joan; Rodríguez, Alejandro; López-Bao, José-Vicente; Palomares, Francisco

    2010-01-01

    Wireless Sensor Networks (WSNs) are being deployed in very diverse application scenarios, including rural and forest environments. In these particular contexts, specimen protection and conservation is a challenge, especially in natural reserves, dangerous locations or hot spots of these reserves (i.e., roads, railways, and other civil infrastructures). This paper proposes and studies a WSN based system for generic target (animal) tracking in the surrounding area of wildlife passages built to establish safe ways for animals to cross transportation infrastructures. In addition, it allows target identification through the use of video sensors connected to strategically deployed nodes. This deployment is designed on the basis of the IEEE 802.15.4 standard, but it increases the lifetime of the nodes through an appropriate scheduling. The system has been evaluated for the particular scenario of wildlife monitoring in passages across roads. For this purpose, different schemes have been simulated in order to find the most appropriate network operational parameters. Moreover, a novel prototype, provided with motion detector sensors, has also been developed and its design feasibility demonstrated. Original software modules providing new functionalities have been implemented and included in this prototype. Finally, main performance evaluation results of the whole system are presented and discussed in depth. PMID:22163601

  3. Wireless Sensor Network Deployment for Monitoring Wildlife Passages

    Directory of Open Access Journals (Sweden)

    José-Vicente López-Bao

    2010-08-01

    Full Text Available Wireless Sensor Networks (WSNs are being deployed in very diverse application scenarios, including rural and forest environments. In these particular contexts, specimen protection and conservation is a challenge, especially in natural reserves, dangerous locations or hot spots of these reserves (i.e., roads, railways, and other civil infrastructures. This paper proposes and studies a WSN based system for generic target (animal tracking in the surrounding area of wildlife passages built to establish safe ways for animals to cross transportation infrastructures. In addition, it allows target identification through the use of video sensors connected to strategically deployed nodes. This deployment is designed on the basis of the IEEE 802.15.4 standard, but it increases the lifetime of the nodes through an appropriate scheduling. The system has been evaluated for the particular scenario of wildlife monitoring in passages across roads. For this purpose, different schemes have been simulated in order to find the most appropriate network operational parameters. Moreover, a novel prototype, provided with motion detector sensors, has also been developed and its design feasibility demonstrated. Original software modules providing new functionalities have been implemented and included in this prototype. Finally, main performance evaluation results of the whole system are presented and discussed in depth.

  4. Regional Energy Deployment System (ReEDS)

    Energy Technology Data Exchange (ETDEWEB)

    Short, W.; Sullivan, P.; Mai, T.; Mowers, M.; Uriarte, C.; Blair, N.; Heimiller, D.; Martinez, A.

    2011-12-01

    The Regional Energy Deployment System (ReEDS) is a deterministic optimization model of the deployment of electric power generation technologies and transmission infrastructure throughout the contiguous United States into the future. The model, developed by the National Renewable Energy Laboratory's Strategic Energy Analysis Center, is designed to analyze the critical energy issues in the electric sector, especially with respect to potential energy policies, such as clean energy and renewable energy standards or carbon restrictions. ReEDS provides a detailed treatment of electricity-generating and electrical storage technologies and specifically addresses a variety of issues related to renewable energy technologies, including accessibility and cost of transmission, regional quality of renewable resources, seasonal and diurnal generation profiles, variability of wind and solar power, and the influence of variability on the reliability of the electrical grid. ReEDS addresses these issues through a highly discretized regional structure, explicit statistical treatment of the variability in wind and solar output over time, and consideration of ancillary services' requirements and costs.

  5. The medical software quality deployment method.

    Science.gov (United States)

    Hallberg, N; Timpka, T; Eriksson, H

    1999-03-01

    The objective of this study was to develop a Quality Function Deployment (QFD) model for design of information systems in health-care environments. Consecutive blocked-subject case studies were conducted, based on action research methods. Starting with a QFD model for software development, a model for information system design, the Medical Software Quality Deployment (MSQD) model, was developed. The MSQD model was divided into the pre-study phase, in which the customer categories and their power to influence the design are determined; the data collection phase, in which the voice of customers (VoC) is identified by observations and interviews and quantified by Critical. Incident questionnaires; the need specification phase, where the VoC is specified into ranked customer needs; and the design phase where the customer needs are transformed stepwise to technical requirements and design attributes. QFD showed to be useful for integrating the values of different customer categories in software development for health-care settings. In the later design phases, other quality methods should be used for software implementation and testing.

  6. A Polygon Model for Wireless Sensor Network Deployment with Directional Sensing Areas

    Science.gov (United States)

    Wu, Chun-Hsien; Chung, Yeh-Ching

    2009-01-01

    The modeling of the sensing area of a sensor node is essential for the deployment algorithm of wireless sensor networks (WSNs). In this paper, a polygon model is proposed for the sensor node with directional sensing area. In addition, a WSN deployment algorithm is presented with topology control and scoring mechanisms to maintain network connectivity and improve sensing coverage rate. To evaluate the proposed polygon model and WSN deployment algorithm, a simulation is conducted. The simulation results show that the proposed polygon model outperforms the existed disk model and circular sector model in terms of the maximum sensing coverage rate. PMID:22303159

  7. A Nonlinear Dynamic Model and Free Vibration Analysis of Deployable Mesh Reflectors

    Science.gov (United States)

    Shi, H.; Yang, B.; Thomson, M.; Fang, H.

    2011-01-01

    This paper presents a dynamic model of deployable mesh reflectors, in which geometric and material nonlinearities of such a space structure are fully described. Then, by linearization around an equilibrium configuration of the reflector structure, a linearized model is obtained. With this linearized model, the natural frequencies and mode shapes of a reflector can be computed. The nonlinear dynamic model of deployable mesh reflectors is verified by using commercial finite element software in numerical simulation. As shall be seen, the proposed nonlinear model is useful for shape (surface) control of deployable mesh reflectors under thermal loads.

  8. Food and drinking water hygiene and intestinal protozoa in deployed German soldiers.

    Science.gov (United States)

    Frickmann, Hagen; Schwarz, Norbert G; Wiemer, Dorothea F; Fischer, Marcellus; Tannich, Egbert; Scheid, Patrick L; Müller, Martin; Schotte, Ulrich; Bock, Wolfgang; Hagen, Ralf M

    2013-03-01

    This report analyzes the occurrence of Cryptosporidium spp., E. histolytica, and G. intestinalis in stool of returnees from military deployments and the impact of hygiene precautions. Between 2007 and 2010, stool samples of 830 returnees that were obtained 8-12 weeks after military deployments in Afghanistan, Uzbekistan, the Balkans, Democratic Republic of the Congo/Gabonese Republic, and Sudan and 292 control samples from non-deployed soldiers were analyzed by PCR for Cryptosporidium spp., E. histolytica, G. intestinalis, and the commensal indicator of fecal contamination E. dispar. Data on hygiene precautions were available. The soldiers were questioned regarding gastrointestinal and general symptoms. Among 1122 stool samples, 18 were positive for G. intestinalis, 10 for E. dispar, and no-one for Cryptosporidium spp. and E. histolytica. An increased risk of acquiring chronic parasitic infections in comparison with non-deployed controls was demonstrated only for G. intestinalis in Sudan, where standardized food and drinking water hygiene precautions could not be implemented. Standard food and drinking water hygiene precautions in the context of screened military field camps proved to be highly reliable in preventing food-borne and water-borne chronic infections and colonization by intestinal protozoa, leading to detection proportions similar to those in non-deployed controls.

  9. Community integration after deployment to Afghanistan: a longitudinal investigation of Danish soldiers.

    Science.gov (United States)

    Karstoft, Karen-Inge; Armour, Cherie; Andersen, Søren B; Bertelsen, Mette; Madsen, Trine

    2015-04-01

    In the years following military deployment, soldiers may experience problems integrating into the community. However, little is known about the nature and prevalence of these problems and if they relate to posttraumatic symptomatology. In a prospective, longitudinal study of Danish soldiers deployed to Afghanistan in 2009 (N = 743), we assessed community reintegration difficulties 2.5 years after home coming (study sample: N = 454). Furthermore, symptoms of posttraumatic stress disorder (PTSD) were assessed before, during, and after deployment. Trajectories of PTSD symptoms from a previously published latent growth mixture modeling analysis were used to address whether community reintegration difficulties differ as a result of course and level of PTSD symptoms. Between 3.6 and 18.0% reported to have some, a lot, or extreme difficulties in reintegration domains such as interpersonal functioning, productivity, community involvement, and self-care. Mean level of reintegration difficulties differed significantly across six PTSD symptom trajectories (range 6.35-36.00); with more symptomatic trajectories experiencing greater community reintegration difficulties. Reintegration difficulties after deployment are present in less than 20% of Danish soldiers who return from Afghanistan. Difficulties are greater in individuals who follow symptomatic PTSD trajectories in the first years following deployment than in those who follow a low-stable trajectory with no or few symptoms.

  10. Should solar photovoltaics be deployed sooner because of long operating life at low, predictable cost?

    International Nuclear Information System (INIS)

    Zweibel, Ken

    2010-01-01

    Governments subsidize the deployment of solar photovoltaics (PV) because PV is deployed for societal purposes. About seven thousand megawatts were deployed in 2009 and over 10,000 are expected in 2010. Yet this is too slow to strongly affect energy and environmental challenges. Faster societal deployment is slowed because PV is perceived to be too costly. Classic economic evaluations would put PV electricity in the range of 15-50 c/kWh, depending on local sunlight and system size. But PV has an unusual, overlooked value: systems can last for a very long time with almost no operating costs, much like, e.g., the Hoover Dam. This long life is rarely taken into account. The private sector cannot use it because far-future cash flow does not add to asset value. But we should not be evaluating PV by business metrics. Governments already make up the difference in return on investment needed to deploy PV. PV deployment is government infrastructure development or direct purchases. Thus the question is: Does the usually unevaluated aspect of long life at predictably low operating costs further motivate governments to deploy more PV, sooner?

  11. The effect of deployment frequencies on the military divorce rate

    OpenAIRE

    Arenstein, Stacy J.

    2011-01-01

    Approved for public release; distribution is unlimited. The primary goal of this research is to investigate whether the length and frequency of deployments affect the likelihood of divorce. The study uses data from the Contingency Tracking System (CTS) and the Active Duty Military Personnel file. The sample includes all active duty Navy and Marine Corps members from 2000 to 2009. Three models of divorce are estimated, each with a different control for the stress of deployment on the f...

  12. The "Parachute" Technique: A Simple and Effective Single-Row Procedure to Achieve an Increased Contact Area Between the Cuff-Tendon and Its Footprint.

    Science.gov (United States)

    Natera, Luis; Consigliere, Paolo; Witney-Lagen, Caroline; Brugera, Juan; Sforza, Giuseppe; Atoun, Ehud; Levy, Ofer

    2017-10-01

    Many techniques of arthroscopic rotator cuff repair have been described. No significant differences in clinical outcomes or rerupture rates have been observed when comparing single-row with double-row methods. Not all single- and double-row repairs are the same. The details of the technique used are crucial. It has been shown that the suture-tendon interface is the weakest point of the reconstruction. Therefore, the biomechanical properties of rotator cuff repairs might be influenced more by the suture configuration than by the number of anchors or by the number of rows involved. Techniques that secure less amount of tendon over a smaller area of the healing zone might be expected to have higher failure rates. The way the sutures of the "parachute technique" are configured represents a quadruple mattress that increases the contact and pressure between the tendon and its footprint and increases the primary load to failure of the repair. We present a simple and effective single-row technique that involves the biomechanical and biological advantages related to the increased contact area and pressure between the cuff and its footprint.

  13. Surface Optimization Techniques for Deployable Reflectors, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Under this and several other programs, CTD has developed TEMBOREG deployable solid-surface reflectors (TEMBOREG Reflectors) to provide future NASA and Air Force...

  14. Combining tariffs, investment subsidies and soft loans in a renewable electricity deployment policy

    International Nuclear Information System (INIS)

    Mir-Artigues, Pere; Río, Pablo del

    2014-01-01

    Policy combinations and interactions have received a considerable attention in the climate and energy policy realm. However, virtually no attention has been paid to the analysis of the combination of different deployment instruments for the same renewable energy technology. This neglect is all the more striking given the existence in current policy practice of combinations of deployment instruments either across technologies or for the same technology, both in the EU and elsewhere. What renewable electricity support policies to use and, therefore, how to combine them in order to promote the deployment of renewable energy technologies cost-effectively is a main concern of governments. The aim of this paper is to provide insight on the cost-effectiveness of combinations of deployment instruments for the same technology. A financial model is developed for this purpose, whereby feed-in tariffs (FITs) are combined with investment subsidies and soft loans. The results show that the policy costs of combinations are the same as for the FITs-only option. Therefore, combining deployment instruments is not a cost-containment strategy. However, combinations may lead to different inter-temporal distributions of the same amount of policy costs and, thus, differently affect the social acceptability and political feasibility of renewable energy support. - Highlights: • Insight on the cost-effectiveness of combinations of deployment instruments for the same technology. • A financial model is developed. • Feed-in tariffs (FITs) are combined with investment subsidies and soft loans. • The policy costs of combinations are the same as for the FITs-only option. • Therefore, combining deployment measures is not a cost-containment strategy

  15. Rich: Region-based Intelligent Cluster-Head Selection and Node Deployment Strategy in Concentric-based WSNs

    Directory of Open Access Journals (Sweden)

    FAN, C.-S.

    2013-11-01

    Full Text Available In a random deployment, sensor nodes are scattered randomly in the sensing field. Hence, the coverage can not be guaranteed. In contrast, the coverage of uniformly deployment is in general larger than the random deployment. However, uniformly deployment strategy may cause unbalanced traffic pattern in wireless sensor networks (WSNs. In this situation, larger load may be imposed to CHs (cluster heads around the sink. Therefore, CHs close to the sink use up their energy earlier than those farther away from the sink. To overcome this problem, we propose a novel node deployment strategy in the concentric model, namely, Region-based Intelligent Cluster-Head selection and node deployment strategy (called Rich. The coverage, energy consumption and data routing issues are well investigated and taken into consideration in the proposed Rich scheme. The simulation results show that the proposed Rich alleviates the unbalanced traffic pattern significantly, prolongs network lifetime and achieves satisfactory coverage ratio.

  16. Design, deployment and performance of 4G-LTE networks a practical approach

    CERN Document Server

    ElNashar, Ayman; Sherif, Mahmoud

    2014-01-01

    This book provides an insight into the key practical aspects and best practice of 4G-LTE network design, performance, and deployment Design, Deployment and Performance of 4G-LTE Networks addresses the key practical aspects and best practice of 4G networks design, performance, and deployment. In addition, the book focuses on the end-to-end aspects of the LTE network architecture and different deployment scenarios of commercial LTE networks. It describes the air interface of LTE focusing on the access stratum protocol layers: PDCP, RLC, MAC, and Physical Layer. The air interface described in this book covers the concepts of LTE frame structure, downlink and uplink scheduling, and detailed illustrations of the data flow across the protocol layers. It describes the details of the optimization process including performance measurements and troubleshooting mechanisms in addition to demonstrating common issues and case studies based on actual field results. The book provides detailed performance analysis of key fe...

  17. Level-2 Milestone 6007: Sierra Early Delivery System Deployed to Secret Restricted Network

    Energy Technology Data Exchange (ETDEWEB)

    Bertsch, A. D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-06

    This report documents the delivery and installation of Shark, a CORAL Sierra early delivery system deployed on the LLNL SRD network. Early ASC program users have run codes on the machine in support of application porting for the final Sierra system which will be deployed at LLNL in CY2018. In addition to the SRD resource, Shark, unclassified resources, Rzmanta and Ray, have been deployed on the LLNL Restricted Zone and Collaboration Zone networks in support of application readiness for the Sierra platform.

  18. Scientific Cluster Deployment and Recovery – Using puppet to simplify cluster management

    International Nuclear Information System (INIS)

    Hendrix, Val; Yao Yushu; Benjamin, Doug

    2012-01-01

    Deployment, maintenance and recovery of a scientific cluster, which has complex, specialized services, can be a time consuming task requiring the assistance of Linux system administrators, network engineers as well as domain experts. Universities and small institutions that have a part-time FTE with limited time for and knowledge of the administration of such clusters can be strained by such maintenance tasks. This current work is the result of an effort to maintain a data analysis cluster (DAC) with minimal effort by a local system administrator. The realized benefit is the scientist, who is the local system administrator, is able to focus on the data analysis instead of the intricacies of managing a cluster. Our work provides a cluster deployment and recovery process (CDRP) based on the puppet configuration engine allowing a part-time FTE to easily deploy and recover entire clusters with minimal effort. Puppet is a configuration management system (CMS) used widely in computing centers for the automatic management of resources. Domain experts use Puppet's declarative language to define reusable modules for service configuration and deployment. Our CDRP has three actors: domain experts, a cluster designer and a cluster manager. The domain experts first write the puppet modules for the cluster services. A cluster designer would then define a cluster. This includes the creation of cluster roles, mapping the services to those roles and determining the relationships between the services. Finally, a cluster manager would acquire the resources (machines, networking), enter the cluster input parameters (hostnames, IP addresses) and automatically generate deployment scripts used by puppet to configure it to act as a designated role. In the event of a machine failure, the originally generated deployment scripts along with puppet can be used to easily reconfigure a new machine. The cluster definition produced in our CDRP is an integral part of automating cluster deployment

  19. Soldier Dimensions and Operational Readiness in U.S. Army Forces Deployed to Kosovo

    National Research Council Canada - National Science Library

    Castro, Carl

    1999-01-01

    .... In a recent study of U.S. Army units deployed to Kosovo in support of a multinational peacekeeping mission, soldier attitudes and health were surveyed on site, mid-way during a 6-month deployment...

  20. Development of psychopathology in deployed armed forces in relation to plasma GABA levels.

    Science.gov (United States)

    Schür, Remmelt R; Boks, Marco P; Geuze, Elbert; Prinsen, Hubertus C; Verhoeven-Duif, Nanda M; Joëls, Marian; Kahn, René S; Vermetten, Eric; Vinkers, Christiaan H

    2016-11-01

    The GABA system is pivotal for an adequate response to a stressful environment but has remained largely unexplored in this context. The present study investigated the relationship of prospectively measured plasma GABA levels with psychopathology symptoms in military deployed to Afghanistan at risk for developing psychopathology following trauma exposure during deployment, including posttraumatic stress disorder (PTSD) and major depressive disorder (MDD). Plasma GABA levels were measured in military personnel (N=731) one month prior to deployment (T0), and one (T1) and six months (T2) after deployment using ultra-performance liquid chromatography coupled to tandem mass spectrometry (UPLC-MS/MS). Mental health problems and depressive symptoms were measured with the Dutch revised Symptom Checklist (SCL-90) and PTSD symptoms with the Dutch Self-Rating Inventory for PTSD (SRIP). Six months after deployment increases in GABA concentrations were present in individuals who had developed mental health problems (T2: β=0.06, p=1.6×10 -2 , T1: β=4.7×10 -2 , p=0.13), depressive symptoms (T2: β=0.29, p=7.9×10 -3 , T1: β=0.23, p=0.072) and PTSD symptoms at T2 (T2: β=0.12, p=4.3×10 -2 , T1: β=0.11, p=0.13). Plasma GABA levels prior to and one month after deployment poorly predicted a high level of psychopathology symptoms either one or six months after deployment. The number of previous deployments, trauma experienced during deployment, childhood trauma, age and sex were not significantly associated with plasma GABA levels over time. Exclusion of subjects who either started or stopped smoking, alcohol or medication use between the three time points rendered the association of increasing GABA levels with the emergence of psychopathology symptoms more pronounced (mental health problems at T2: β=0.09, p=4.2×10 -3 ; depressive symptoms at T2: β=0.35, p=3.5×10 -3 , PTSD symptoms at T2: β=0.17, p=1.7×10 -2 ). To our knowledge, this is the first study to provide

  1. Planning and Management of Technology Deployment Center

    International Nuclear Information System (INIS)

    Park, Jae Won; Joo, Po Kook; Kim, Jun Yeon and others

    2005-08-01

    The R and D contents are summarized as follows ; Models were set-up for transferring the developed technologies to the industry and managing technology deployment center to vitalize the commercialization and then the set-up model was tried to apply for transferring technologies for commercialization and to define interfaces between the R and D and industrial applications In this project, new products and processes were developed for promoting the commercialization. Infra-structures were firmly set-up for the venture company promotion and technology deployment developed during executing the proton Engineering frontier Project. Commercialization methodology connection with industrial companies were studied by outside specializing institute. Development of gem-stone coloring and new photo catalyst producing techniques are very high value-adding technologies, therefore, experimental and theoretical R and D were transacted simultaneously to obtain the originality of the technology. The theoretical R and D was committed to a specialist outside

  2. Extreme Environment Sampling System Deployment Mechanism, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Future Venus or Comet mission architectures may feature robotic sampling systems comprised of a Sampling Tool and Deployment Mechanism. Since 2005, Honeybee has been...

  3. Scarab III Remote Vehicle Deployment for Waste Retrieval and Tank Inspection

    International Nuclear Information System (INIS)

    Burks, B.L.; Falter, D.D.; Noakes, M.; Vesco, D.

    1999-01-01

    The Robotics Technology Development Program now known as the Robotics Crosscut Program, funded the development and deployment of a small remotely operated vehicle for inspection and cleanout of small horizontal waste storage tanks that have limited access. Besides the advantage of access through tank risers as small as 18-in. diameter, the small robotic system is also significantly less expensive to procure and to operate than larger remotely operated vehicle (ROV) systems. The vehicle specified to support this activity was the ROV Technologies, Inc., Scarab. The Scarab is a tracked vehicle with an independently actuated front and rear ''toe'' degree-of-freedom which allows the stand-off and angle of the vehicle platform with respect to the floor to be changed. The Scarab is a flexible remote tool that can be used for a variety of tasks with its primary uses targeted for inspection and small scale waste retrieval. The vehicle and any necessary process equipment are mounted in a deployment and containment enclosure to simplify deployment and movement of the system from tank to tank. This paper outlines the technical issues related to the Scarab vehicle and its deployment for use in tank inspection and waste retrieval operation

  4. Sensor Deployment for Air Pollution Monitoring Using Public Transportation System

    OpenAIRE

    Yu, James J. Q.; Li, Victor O. K.; Lam, Albert Y. S.

    2015-01-01

    Air pollution monitoring is a very popular research topic and many monitoring systems have been developed. In this paper, we formulate the Bus Sensor Deployment Problem (BSDP) to select the bus routes on which sensors are deployed, and we use Chemical Reaction Optimization (CRO) to solve BSDP. CRO is a recently proposed metaheuristic designed to solve a wide range of optimization problems. Using the real world data, namely Hong Kong Island bus route data, we perform a series of simulations an...

  5. Study on the three-station typical network deployments of workspace Measurement and Positioning System

    Science.gov (United States)

    Xiong, Zhi; Zhu, J. G.; Xue, B.; Ye, Sh. H.; Xiong, Y.

    2013-10-01

    As a novel network coordinate measurement system based on multi-directional positioning, workspace Measurement and Positioning System (wMPS) has outstanding advantages of good parallelism, wide measurement range and high measurement accuracy, which makes it to be the research hotspots and important development direction in the field of large-scale measurement. Since station deployment has a significant impact on the measurement range and accuracy, and also restricts the use-cost, the optimization method of station deployment was researched in this paper. Firstly, positioning error model was established. Then focusing on the small network consisted of three stations, the typical deployments and error distribution characteristics were studied. Finally, through measuring the simulated fuselage using typical deployments at the industrial spot and comparing the results with Laser Tracker, some conclusions are obtained. The comparison results show that under existing prototype conditions, I_3 typical deployment of which three stations are distributed in a straight line has an average error of 0.30 mm and the maximum error is 0.50 mm in the range of 12 m. Meanwhile, C_3 typical deployment of which three stations are uniformly distributed in the half-circumference of an circle has an average error of 0.17 mm and the maximum error is 0.28 mm. Obviously, C_3 typical deployment has a higher control effect on precision than I_3 type. The research work provides effective theoretical support for global measurement network optimization in the future work.

  6. Oral health survey of the military personnel deployed to the southernmost provinces of Thailand.

    Science.gov (United States)

    Sutthavong, Sirikarn; Ukritchon, Supak; Rangsin, Ram

    2014-02-01

    Dental problems are some of the major health problems of deployed miilitaly personnel. There have been no systematically reports of oral health information survey among the deployed military personnel in Thailand. The present study was to determine the oral health problems of the deployed military personnel and effects on personnel fitness. A cross-sectional study and a cluster sampling were conducted during April 2011 and March 2013. The Royal Thai Army (RTA) personnel 12 out of21 task forces in southern most provinces were invited to participate in the study. A standardized questionnaire was used. In total, 2,884 RTA deployed personnel voluntarily participated and completed the questionnaire infonnrmation. Their mean age was 27.8 +/- 9.4 years old. Fifty percent admitted that they had oral problems during the past six months and the most common ones were toothache/hypersensitivity (32.4%), and dental caries (21.5%). The majority of the participants (60.7%) reported that they experienced oral health problems less than 3 times and 2.8% reported sick leave during deployment because of oral conditions. 64.4% reported that their oral problems affected their quality of life and disturbed their duties. A relatively high prevalence oforal health problems was reported by the deployed RTA personnel. The problems affected their quality of life and assigned duties. Most ofthe problems were neglected. In order to keep the RTApersonnel fit for deployment, an effective dental health program should be developed.

  7. DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187

    Energy Technology Data Exchange (ETDEWEB)

    BURKE CA; LANDON MR; HANSON CE

    2011-11-08

    Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are beinglhave been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan [1]. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

  8. DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187

    Energy Technology Data Exchange (ETDEWEB)

    BURKE CA; LANDON MR; HANSON CE

    2012-01-30

    Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are being/have been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

  9. Delta XTE Spacecraft Solar Panel Deployment, Hangar AO at Cape Canaveral Air Station

    Science.gov (United States)

    1995-01-01

    The footage shows technicians in the clean room checking and adjusting the deployment mechanism of the solar panel for XTE spacecraft. Other scenes show several technicians making adjustments to software for deployment of the solar panels.

  10. 77 FR 36903 - Accelerating Broadband Infrastructure Deployment

    Science.gov (United States)

    2012-06-20

    ... the Nation's global competitiveness in the 21st century, driving job creation, promoting innovation, and expanding markets for American businesses. Broadband access also affords public safety agencies... infrastructure has been deployed in a vast majority of communities across the country, today too many areas still...

  11. Heterogeneous Deployment to Meet Traffic Demand in a Realistic LTE Urban Scenario

    DEFF Research Database (Denmark)

    Coletti, Claudio; Hu, Liang; Nguyen, Huan Cong

    2012-01-01

    growth of mo-bile broadband traffic. Emphasis is put on how to optimally as-sign the spectrum for the different networks layers in an evolved HetNet including outdoor and indoor small cells. The study is conducted for a “Hot-Zone” scenario, i.e. a high-traffic area within a realistic dense urban...... performance with a minimum user data rate of 1 Mbps is achieved when deploying small cells on dedicated channels rather than co-channel deployment. Fur-thermore, the joint pico and femto deployment turns out to be the right trade-off between increased base station density and en-hanced network capacity....

  12. Deployment Experiences of British Army Wives Before, During and After Deployment: Satisfaction with Military Life and Use of Support Networks

    National Research Council Canada - National Science Library

    Dandeker, Christopher; French, Claire; Birtles, Catherine; Wessely, S

    2006-01-01

    Introduction and Aims: During deployments, Service wives have to adapt to being alone and taking sole responsibility for their families and house-holds whilst dealing with the additional stress about whether their loved ones will return...

  13. Deployment Technology of a Heliogyro Solar Sail for Long Duration Propulsion

    Science.gov (United States)

    Peerawan, Wiwattananon; Bryant, Robert G.; Edmonson, William W.; Moore, William B.; Bell, Jared M.

    2015-01-01

    Interplanetary, multi-mission, station-keeping capabilities will require that a spacecraft employ a highly efficient propulsion-navigation system. The majority of space propulsion systems are fuel-based and require the vehicle to carry and consume fuel as part of the mission. Once the fuel is consumed, the mission is set, thereby limiting the potential capability. Alternatively, a method that derives its acceleration and direction from solar photon pressure using a solar sail would eliminate the requirement of onboard fuel to meet mission objectives. MacNeal theorized that the heliogyro-configured solar sail architecture would be lighter, less complex, cheaper, and less risky to deploy a large sail area versus a masted sail. As sail size increases, the masted sail requires longer booms resulting in increased mass, and chaotic uncontrollable deployment. With a heliogyro, the sail membrane is stowed as a roll of thin film forming a blade when deployed that can extend up to kilometers. Thus, a benefit of using a heliogyro-configured solar sail propulsion technology is the mission scalability as compared to masted versions, which are size constrained. Studies have shown that interplanetary travel is achievable by the heliogyro solar sail concept. Heliogyro solar sail concept also enables multi-mission missions such as sample returns, and supply transportation from Earth to Mars as well as station-keeping missions to provide enhanced warning of solar storm. This paper describes deployment technology being developed at NASA Langley Research Center to deploy and control the center-of-mass/center-of-pressure using a twin bladed heliogyro solar sail 6-unit (6U) CubeSat. The 6U comprises 2x2U blade deployers and 2U for payload. The 2U blade deployers can be mounted to 6U or larger scaled systems to serve as a non-chemical in-space propulsion system. A single solar sail blade length is estimated to be 2.4 km with a total area from two blades of 720 m2; total allowable weight

  14. Performance of full-sib families of Douglas-fir in pure-family and mixed-family deployments

    Science.gov (United States)

    Peter J. Gould; J. Bradley St.Clair; Paul D. Anderson

    2011-01-01

    A major objective of tree improvement programs is to identify genotypes that will perform well in operational deployments. Relatively little is known, however, about how the competitive environment affects performance in different types of deployments. We tested whether the genetic composition and density of deployments affect the performance of full-sib families of...

  15. The Deployment Experience: Organizational Climate and Work Life

    National Research Council Canada - National Science Library

    Wilcove, Gerry L

    2006-01-01

    ...) and shore personnel (n = 5,032). Results for 2005 showed that deployed personnel had significantly more negative attitudes than shore personnel on several indices, including job satisfaction, quality of command leadership, available...

  16. Severe Neuropsychiatric Reaction in a Deployed Military Member after Prophylactic Mefloquine

    Directory of Open Access Journals (Sweden)

    Alan L. Peterson

    2011-01-01

    Full Text Available Recent studies of military personnel who have deployed to Iraq and Afghanistan have reported a number of combat-related psychiatric disorders such as posttraumatic stress disorder, depression, and traumatic brain injury. This case report involves a 27-year-old male active-duty US military service member who developed severe depression, psychotic hallucinations, and neuropsychological sequelae following the prophylactic use of the antimalarial medication mefloquine hydrochloride. The patient had a recent history of depression and was taking antidepressant medications at the time of his deployment to the Middle East. Psychiatrists and other health care providers should be aware of the possible neuropsychiatric side effects of mefloquine in deployed military personnel and should consider the use of other medications for malaria prophylaxis in those individuals who may be at increased risk for side effects.

  17. A Modular Approach To Developing A Large Deployable Reflector

    Science.gov (United States)

    Pittman, R.; Leidich, C.; Mascy, F.; Swenson, B.

    1984-01-01

    NASA is currently studying the feasibility of developing a Large Deployable Reflector (LDR) astronomical facility to perform astrophysical studies of the infrared and submillimeter portion of the spectrum in the mid 1990's. The LDR concept was recommended by the Astronomy Survey Committee of the National Academy of Sciences as one of two space based projects to be started this decade. The current baseline calls for a 20 m (65.6 ft) aperture telescope diffraction limited at 30 μm and automatically deployed from a single Shuttle launch. The volume, performance, and single launch constraints place great demands on the technology and place LDR beyond the state-of-the-art in certain areas such as lightweight reflector segments. The advent of the Shuttle is opening up many new options and capabilities for producing large space systems. Until now, LDR has always been conceived as an integrated system, deployed autonomously in a single launch. This paper will look at a combination of automatic deployment and on-orbit assembly that may reduce the technological complexity and cost of the LDR system. Many technological tools are now in use or under study that will greatly enhance our capabilities to do assembly in space. Two Shuttle volume budget scenarios will be examined to assess the potential of these tools to reduce the LDR system complexity. Further study will be required to reach the full optimal combination of deployment and assembly, since in most cases the capabilities of these new tools have not been demonstrated. In order to take maximum advantage of these concepts, the design of LDR must be flexible and allow one subsystem to be modified without adversely affecting the entire system. One method of achieving this flexibility is to use a modular design approach in which the major subsystems are physically separated during launch and assembled on orbit. A modular design approach facilitates this flexibility but requires that the subsystems be interfaced in a simple

  18. Review of Large Spacecraft Deployable Membrane Antenna Structures

    Science.gov (United States)

    Liu, Zhi-Quan; Qiu, Hui; Li, Xiao; Yang, Shu-Li

    2017-11-01

    The demand for large antennas in future space missions has increasingly stimulated the development of deployable membrane antenna structures owing to their light weight and small stowage volume. However, there is little literature providing a comprehensive review and comparison of different membrane antenna structures. Space-borne membrane antenna structures are mainly classified as either parabolic or planar membrane antenna structures. For parabolic membrane antenna structures, there are five deploying and forming methods, including inflation, inflation-rigidization, elastic ribs driven, Shape Memory Polymer (SMP)-inflation, and electrostatic forming. The development and detailed comparison of these five methods are presented. Then, properties of membrane materials (including polyester film and polyimide film) for parabolic membrane antennas are compared. Additionally, for planar membrane antenna structures, frame shapes have changed from circular to rectangular, and different tensioning systems have emerged successively, including single Miura-Natori, double, and multi-layer tensioning systems. Recent advances in structural configurations, tensioning system design, and dynamic analysis for planar membrane antenna structures are investigated. Finally, future trends for large space membrane antenna structures are pointed out and technical problems are proposed, including design and analysis of membrane structures, materials and processes, membrane packing, surface accuracy stability, and test and verification technology. Through a review of large deployable membrane antenna structures, guidance for space membrane-antenna research and applications is provided.

  19. Information Analysis Methodology for Border Security Deployment Prioritization and Post Deployment Evaluation

    International Nuclear Information System (INIS)

    Booker, Paul M.; Maple, Scott A.

    2010-01-01

    Due to international commerce, cross-border conflicts, and corruption, a holistic, information driven, approach to border security is required to best understand how resources should be applied to affect sustainable improvements in border security. The ability to transport goods and people by land, sea, and air across international borders with relative ease for legitimate commercial purposes creates a challenging environment to detect illicit smuggling activities that destabilize national level border security. Smuggling activities operated for profit or smuggling operations driven by cross border conflicts where militant or terrorist organizations facilitate the transport of materials and or extremists to advance a cause add complexity to smuggling interdiction efforts. Border security efforts are further hampered when corruption thwarts interdiction efforts or reduces the effectiveness of technology deployed to enhance border security. These issues necessitate the implementation of a holistic approach to border security that leverages all available data. Large amounts of information found in hundreds of thousands of documents can be compiled to assess national or regional borders to identify variables that influence border security. Location data associated with border topics of interest may be extracted and plotted to better characterize the current border security environment for a given country or region. This baseline assessment enables further analysis, but also documents the initial state of border security that can be used to evaluate progress after border security improvements are made. Then, border security threats are prioritized via a systems analysis approach. Mitigation factors to address risks can be developed and evaluated against inhibiting factor such as corruption. This holistic approach to border security helps address the dynamic smuggling interdiction environment where illicit activities divert to a new location that provides less resistance

  20. Deployment of the CMS software on the WLCG Grid

    International Nuclear Information System (INIS)

    Behrenhoff, W; Wissing, C; Kim, B; Blyweert, S; D'Hondt, J; Maes, J; Maes, M; Mulders, P Van; Villella, I; Vanelderen, L

    2011-01-01

    The CMS Experiment is taking high energy collision data at CERN. The computing infrastructure used to analyse the data is distributed round the world in a tiered structure. In order to use the 7 Tier-1 sites, the 50 Tier-2 sites and a still growing number of about 30 Tier-3 sites, the CMS software has to be available at those sites. Except for a very few sites the deployment and the removal of CMS software is managed centrally. Since the deployment team has no local accounts at the remote sites all installation jobs have to be sent via Grid jobs. Via a VOMS role the job has a high priority in the batch system and gains write privileges to the software area. Due to the lack of interactive access the installation jobs must be very robust against possible failures, in order not to leave a broken software installation. The CMS software is packaged in RPMs that are installed in the software area independent of the host OS. The apt-get tool is used to resolve package dependencies. This paper reports about the recent deployment experiences and the achieved performance.

  1. Creating a Comprehensive Solar Water Heating Deployment Strategy

    International Nuclear Information System (INIS)

    Focus Marketing Services

    1999-01-01

    This report details the results of a research conducted in 1998 and 1999 and outlines a marketing deployment plan designed for businesses interested in marketing solar water heaters in the new home industry

  2. Creating a Comprehensive Solar Water Heating Deployment Strategy

    Energy Technology Data Exchange (ETDEWEB)

    Focus Marketing Services

    1999-08-18

    This report details the results of a research conducted in 1998 and 1999 and outlines a marketing deployment plan designed for businesses interested in marketing solar water heaters in the new home industry.

  3. Deployment of Intelligent Transportation Systems: A Summary of the 2016 National Survey Results

    Science.gov (United States)

    2018-03-01

    This report presents summary results of the 2016 ITS Deployment Tracking survey, the most recent survey conducted through the ITS Deployment Tracking Project. The U.S. Department of Transportation and the ITS Joint Program Office have pursued a resea...

  4. Book Review: Deployment Psychology: Evidence-based strategies ...

    African Journals Online (AJOL)

    Book Review: Deployment Psychology: Evidence-based strategies to promote mental health in the Military. AB Adler, PD Bliese, CA Castro. Abstract. Washington, DC: American Psychological Association 2011 294 pages ISBN-13: 978-1-4338-0881-4. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  5. Microsoft System Center Configuration Manager advanced deployment

    CERN Document Server

    Coupland, Martyn

    2014-01-01

    If you are an experienced Configuration Manager administrator looking to advance your career or get more from your current environment, then this book is ideal for you. Prior experience of deploying and managing a Configuration Manager site would be helpful in following the examples throughout this book.

  6. Improvements for rotary viscous dampers used in spacecraft deployment mechanisms

    Science.gov (United States)

    Stewart, Alphonso; Powers, Charles; Lyons, Ron

    1998-01-01

    During component level thermal-vacuum deployment testing of eight rotary viscous dampers for the Tropical Rainfall Measuring Mission (TRMM) satellite, all the dampers failed to provide damping during a region of the deployment. Radiographic examination showed that air in the damping fluid caused the undamped motion when the dampers were operated in a vacuum environment. Improvements in the procedure used to fill the dampers with damping fluid, the installation of a Viton vacuum seal in the damper cover, and improved screening techniques eliminated the problem.

  7. Six policy actions for accelerated deployment of renewable energy. READy Renewable Energy Action on Deployment. Summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-03-15

    The READy book presents a kaleidoscope of policy options that have proven to accelerate the deployment of renewable energy technologies, based on experiences around the world at the local and national levels. Lessons learned from successful cases are distilled into six essential action points. Together these categories of policy actions compose the ACTION Star, a guide for taking action now while preparing for growth over the long term.

  8. Supply strategy for SMR deployment

    International Nuclear Information System (INIS)

    Coccagna, A.F.

    2013-01-01

    This document provides a description of Babcock and Wilcox's deployment strategy for the mPower™ Small Modular Reactor from the perspective of Supply Chain and Manufacturing. A desirable future state of readiness is described as one which leverages and revitalizes an existing supply chain and manufacturing infrastructure, as well as leveraging an existing workforce of engineering, construction, and project management employees. B and W's mPower™ SMR value proposition offers many desired design and operating advantages to the SMR market. (author)

  9. Influence of military component and deployment-related experiences on mental disorders among Canadian military personnel who deployed to Afghanistan: a cross-sectional survey

    Science.gov (United States)

    Boulos, David; Fikretoglu, Deniz

    2018-01-01

    Objective The primary objective was to explore differences in mental health problems (MHP) between serving Canadian Armed Forces (CAF) components (Regular Force (RegF); Reserve Force (ResF)) with an Afghanistan deployment and to assess the contribution of both component and deployment experiences to MHP using covariate-adjusted prevalence difference estimates. Additionally, mental health services use (MHSU) was descriptively assessed among those with a mental disorder. Design Data came from the 2013 CAF Mental Health Survey, a cross-sectional survey of serving personnel (n=72 629). Analyses were limited to those with an Afghanistan deployment (population n=35 311; sampled n=4854). Logistic regression compared MHP between RegF and ResF members. Covariate-adjusted prevalence differences were computed. Primary outcome measure The primary outcomes were MHP, past-year mental disorders, identified using the WHO’s Composite International Diagnostic Interview, and past-year suicide ideation. Results ResF personnel were less likely to be identified with a past-year anxiety disorder (adjusted OR (AOR)=0.72 (95% CI 0.58 to 0.90)), specifically both generalised anxiety disorder and panic disorder, but more likely to be identified with a past-year alcohol abuse disorder (AOR=1.63 (95% CI 1.04 to 2.58)). The magnitude of the covariate-adjusted disorder prevalence differences for component was highest for the any anxiety disorder outcome, 2.8% (95% CI 1.0 to 4.6); lower for ResF. All but one deployment-related experience variable had some association with MHP. The ‘ever felt responsible for the death of a Canadian or ally personnel’ experience had the strongest association with MHP; its estimated covariate-adjusted disorder prevalence difference was highest for the any (of the six measured) mental disorder outcome (11.2% (95% CI 6.6 to 15.9)). Additionally, ResF reported less past-year MHSU and more past-year civilian MHSU. Conclusions Past-year MHP differences were

  10. Hadoop Cluster Deployment: A Methodological Approach

    Directory of Open Access Journals (Sweden)

    Ronaldo Celso Messias Correia

    2018-05-01

    Full Text Available For a long time, data has been treated as a general problem because it just represents fractions of an event without any relevant purpose. However, the last decade has been just about information and how to get it. Seeking meaning in data and trying to solve scalability problems, many frameworks have been developed to improve data storage and its analysis. As a framework, Hadoop was presented as a powerful tool to deal with large amounts of data. However, it still causes doubts about how to deal with its deployment and if there is any reliable method to compare the performance of distinct Hadoop clusters. This paper presents a methodology based on benchmark analysis to guide the Hadoop cluster deployment. The experiments employed The Apache Hadoop and the Hadoop distributions of Cloudera, Hortonworks, and MapR, analyzing the architectures on local and on clouding—using centralized and geographically distributed servers. The results show the methodology can be dynamically applied on a reliable comparison among different architectures. Additionally, the study suggests that the knowledge acquired can be used to improve the data analysis process by understanding the Hadoop architecture.

  11. Scenario study on the FBR deployment

    International Nuclear Information System (INIS)

    Ono, Kiyoshi; Kofuji, Hirohide; Otaki, Akira; Yonezawa, Shigeaki; Shinoda, Yoshihiko; Hirao, Kazunori; Ikegami, Tetsuo

    2000-12-01

    This study on success scenarios for the Fast Breeder Reactor (FBR) deployment was performed taking account of future situation of fossil, renewable and nuclear energies in Japan as well as the world from the viewpoints of the following four items; economics, environment, energy security and restriction of natural uranium resources. In the economics scenario, if carbon tax is added to generating cost of LNG, coal and oil and the economics of FBR cycle is competitive with LWR cycle in the future, FBR cycle will be expected to introduce as the middle and base load power plant. In the environment scenario, there is also any possibility that FBR cycle which can burn and transmute minor actinide and fission product elements will be introduced in order to reduce the burden of deposit facility and the toxicity of high-level waste. In the uranium resources restriction scenario, FBR cycle needs to be deployed at the latest in the middle of 21st century from the viewpoint of the restriction of natural uranium resources. This study was carried out in a part of JNC's feasibility study on commercialized FBR cycle system. (author)

  12. Rail deployment and storage procedure and test for ITER blanket remote maintenance

    International Nuclear Information System (INIS)

    Kakudate, S.; Shibanuma, K.

    2003-01-01

    A concept of rail-mounted vehicle manipulator system has been developed to apply to the maintenance of the ITER blanket composed of ∼400 modules in the vacuum vessel. The most critical issue of the vehicle manipulator system is the feasibility of the deployment and storage of the articulated rail, composed of eight rail links without any driving mechanism in the joints. To solve this issue, a new driving mechanism and procedure for the rail deployment and storage has been proposed, taking account of the repeated operation of the multi-rail links deployed and stored in the same kinematical manner. The new driving mechanism, which is different from those of a usual articulated manipulator or 'articulated boom' equipped with actuators in every joint for movement, is composed of three external mechanisms installed outside the articulated rail, i.e. a vehicle traveling mechanism as main driver and two auxiliary driving mechanisms. A simplified synchronized control of three driving mechanisms has also been proposed, including 'torque-limit control' for suppression of the overload of the mechanisms. These proposals have been tested using a full-scale vehicle manipulator system, in order to demonstrate the proof of principle for rail deployment and storage. As a result, the articulated rail has been successfully deployed and stored within 6 h each, less than the target of 8 h, by means of the three external driving mechanisms and the proposed synchronized control. In addition, the overload caused by an unexpected mismatch of the synchronized control of three driving mechanisms has also been successfully suppressed less than the rated torque by the proposed 'torque-limit control'. It is therefore concluded that the feasibility of the rail deployment and storage of the vehicle manipulator system has been demonstrated

  13. A late and failure of airbag deployment case study for drivers of passenger cars in rear-end collisions

    Science.gov (United States)

    Toganel, George-Radu; Ovidiu Soica, Adrian

    2017-10-01

    The presented study was directed at two types of airbag miss-deployments: late deployment and non-deployment. Late deployment can be a product of override or underride road traffic accidents. Non-deployment can be a product of technical failure or trigger algorithm’s inability to correctly assume the state of the accident to happen. In order to analyse the phenomena through physical tests, a specialized test device was used for a series of 8 non-deployment tests and a series of 4 airbag firing tests, totalling 12 tests. Acceleration based data was recorded and analysed for the movement of the device part simulating the driver head. High speed video recording was used to analyse the mechanics of airbag deployment and correlate with the acceleration based data. It has been determined, in the limitations of the laboratory testing environment, a significant variation of the time frame for the airbag deployments, despite using similar testing conditions and identical tested products. Also, the initial time frame for airbag deployment delay was overshadowed by other factors such as time to impact.

  14. Deploying wildland fire suppression resources with a scenario-based standard response model

    Science.gov (United States)

    Robert G. Haight; Jeremy S. Fried

    2007-01-01

    Wildland fire managers deploy suppression resources to bases and dispatch them to fires to maximize the percentage of fires that are successfully contained before unacceptable costs and losses occur. Deployment is made with budget constraints and uncertainty about the daily number, location, and intensity of fires, all of which affect initial-attack success. To address...

  15. Method of Geometric Connected Disk Cover Problem for UAV realy network deployment

    Directory of Open Access Journals (Sweden)

    Chuang Liu

    2017-01-01

    Full Text Available Aiming at the problem of the effective connectivity of a large number of mobile combat units in the future aeronautic swarm operation, this paper proposes an idea of using UAV(Unmanned Aerial Vehicle to build, and studies the deployment of the network. User coverage and network connectivity are important for a relay network planning which are studied separately in traditional ways. In order to effectively combine these two factors while the network’s survivability is taken into account. Firstly, the concept of node aggregation degree is proposed. Secondly, a performance evaluation parameter for UAV relay network is proposed based on node aggregation degree, then analyzes the lack of deterministic deployment and presents one a PSO (VFA-PSO deployment algorithm based on virtual force. Finally, compared with the existing algorithms, the validity and stability of the algorithm are verified. The experimental results show that the VFA-PSO algorithm can effectively improve the network coverage and the survivability of the network under the premise of ensuring the network connectivity, and has better deployment effect.

  16. Risk and protective factors for suicidal ideation and suicide attempts among deployed Danish soldiers from 1990 to 2009.

    Science.gov (United States)

    Ejdesgaard, Bo Andersen; Zøllner, Lilian; Jensen, Børge Frank; Jørgensen, Hans-Ole; Kähler, Henrik

    2015-01-01

    The study was undertaken to identify risk and protective factors for suicidal ideation and suicide attempts among deployed Danish soldiers. Research on suicide among Danish veterans has only been conducted to a limited degree. The method applied was a questionnaire survey administered to a population of 1,264 Danish soldiers deployed from 1990 to 2009. The data were analyzed using backward logistic regression modeling in SAS 9.2. In the logistic regression analysis, the following were significant risk factors for suicidal ideation: drug abuse, a poor financial situation before deployment, a heavy workload and/or repatriation during deployment, and attending a poor athletic and recreation program after deployment. Significant protective factors against suicidal ideation were support from friends at home during deployment and appreciation by the general population after deployment. Significant risk factors for suicide attempts were an unhappy childhood and pointless tasks during deployment. No significant protective factors against suicide attempts were identified. On the basis of the results presented in this study, intervention against suicidal behavior would benefit from screening for certain childhood issues, drug abuse, and poor financial situation before deployment. During deployment, measures should be taken to minimize the amount of meaningless tasks and heavy workloads. At the same time, efficient ways of communicating with home should be ensured. After deployment, good athletic and recreation programs should be warranted for all military personnel-including repatriated soldiers. Finally, priority should be given to ensure public appreciation of what deployed soldiers accomplish. Reprint & Copyright © 2015 Association of Military Surgeons of the U.S.

  17. Deployment Effects of Marine Renewable Energy Technologies: Wave Energy Scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Mirko Previsic

    2010-06-17

    Given proper care in siting, design, deployment, operation and maintenance, wave energy conversion could become one of the more environmentally benign sources of electricity generation. In order to accelerate the adoption of these emerging hydrokinetic and marine energy technologies, navigational and environmental concerns must be identified and addressed. All developing hydrokinetic projects involve a wide variety of stakeholders. One of the key issues that site developers face as they engage with this range of stakeholders is that, due to a lack of technical certainty, many of the possible conflicts (e.g., shipping and fishing) and environmental issues are not well-understood,. In September 2008, re vision consulting, LLC was selected by the Department of Energy (DoE) to apply a scenario-based assessment to the emerging hydrokinetic technology sector in order to evaluate the potential impact of these technologies on the marine environment and navigation constraints. The project’s scope of work includes the establishment of baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios capture variations in technical approaches and deployment scales to properly identify and characterize environmental effects and navigational effects. The goal of the project is to provide all stakeholders with an improved understanding of the potential range of technical attributes and potential effects of these emerging technologies and focus all stakeholders on the critical issues that need to be addressed. By identifying and addressing navigational and environmental concerns in the early stages of the industry’s development, serious mistakes that could potentially derail industry-wide development can be avoided. This groundwork will also help in streamlining siting and associated permitting processes, which are considered key hurdles for the industry’s development in the U.S. today. Re vision is coordinating its efforts with two

  18. Molten salt reactors and possible scenarios for future nuclear power deployment

    International Nuclear Information System (INIS)

    Merle-Lucotte, E.; Mathieu, L.; Heuer, D.; Loiseaux, J. M.; Billebaud, A.; Brissot, R.; David, S.; Garzenne, C.; Laulan, O.; Le Brun, C.; Lecarpentier, D.; Liatard, E.; Meplan, O.; Michel-Sendis, F.; Nuttin, A.; Perdu, F.

    2004-01-01

    An important fraction of the nature energy demand may be satisfied by nuclear power. In this context, the possibilities of worldwide nuclear deployment are studied. We are convinced that the Molten Salt Reactors may play a central role in this deployment. The Molten Salt Reactor needs to be coupled to a reprocessing unit in order to extract the Fission Products which poison the core. The efficiency of this reprocessing has a crucial influence on reactor behavior especially for the breeding ratio. The Molten Salt Breeder Reactor project was based on an intensive reprocessing for high breeding purposes. A new concept of Thorium Molten Salt Reactor is presented here. Including this new concept in the worldwide nuclear deployment, to satisfy these power needs, we consider three typical scenarios, based on three reactor types: Pressurized Water Reactor, Fast Neutron Reactor and Thorium Molten Salt Reactor. The aim of this paper is to demonstrate, in a first hand that a Thorium Molten Salt Reactor can be realistic, with correct temperature coefficients and at least iso-breeder with slow reprocessing and new geometry; on the other hand that such Molten Salt Reactors enable a successful nuclear deployment, while minimizing fuel and waste management problems. (authors)

  19. Experimental and Analytical Evaluation of a Composite Honeycomb Deployable Energy Absorber

    Science.gov (United States)

    Jackson, Karen E.; Kellas, Sotiris; Horta, Lucas G.; Annett, Martin S.; Polanco, Michael A.; Littell, Justin D.; Fasanella, Edwin L.

    2011-01-01

    In 2006, the NASA Subsonic Rotary Wing Aeronautics Program sponsored the experimental and analytical evaluation of an externally deployable composite honeycomb structure that is designed to attenuate impact energy during helicopter crashes. The concept, which is designated the Deployable Energy Absorber (DEA), utilizes an expandable Kevlar honeycomb structure to dissipate kinetic energy through crushing. The DEA incorporates a unique flexible hinge design that allows the honeycomb to be packaged and stowed flat until needed for deployment. A variety of deployment options such as linear, radial, and/or hybrid methods can be used. Experimental evaluation of the DEA utilized a building block approach that included material characterization testing of its constituent, Kevlar -129 fabric/epoxy, and flexural testing of single hexagonal cells. In addition, the energy attenuation capabilities of the DEA were demonstrated through multi-cell component dynamic crush tests, and vertical drop tests of a composite fuselage section, retrofitted with DEA blocks, onto concrete, water, and soft soil. During each stage of the DEA evaluation process, finite element models of the test articles were developed and simulations were performed using the explicit, nonlinear transient dynamic finite element code, LS-DYNA. This report documents the results of the experimental evaluation that was conducted to assess the energy absorption capabilities of the DEA.

  20. Charges Assessed the Army by the Defense Logistics Agency for Deployable Medical Systems

    National Research Council Canada - National Science Library

    1995-01-01

    .... Deployable medical systems are standardized modular field hospitals that can be prepositioned in the event of a contingency, national emergency, or war operations. In FY 1994, the Defense Personnel Support Center billed the Army $25 million for acquiring and assembling deployable medical systems.

  1. Base Station Antenna Pattern Distortion in Practical Urban Deployment Scenarios

    DEFF Research Database (Denmark)

    Rodriguez Larrad, Ignacio; Nguyen, Huan Cong; Sørensen, Troels Bundgaard

    2014-01-01

    In real urban deployments, base station antennas are typically not placed in free space conditions. Therefore, the radiation pattern can be affected by mounting structures and nearby obstacles located in the proximity of the antenna (near-field), which are often not taken into consideration. Also...... presents a combination of near-field and far-field simulations aimed to provide an overview of the distortion experienced by the base station antenna pattern in two different urban deployment scenarios: rooftop and telecommunications tower. The study illustrates how, in comparison with the near...

  2. Electricity network limitations on large-scale deployment of wind energy

    Energy Technology Data Exchange (ETDEWEB)

    Fairbairn, R.J.

    1999-07-01

    This report sought to identify limitation on large scale deployment of wind energy in the UK. A description of the existing electricity supply system in England, Scotland and Wales is given, and operational aspects of the integrated electricity networks, licence conditions, types of wind turbine generators, and the scope for deployment of wind energy in the UK are addressed. A review of technical limitations and technical criteria stipulated by the Distribution and Grid Codes, the effects of system losses, and commercial issues are examined. Potential solutions to technical limitations are proposed, and recommendations are outlined.

  3. Gender differences among veterans deployed in support of the wars in Afghanistan and Iraq.

    Science.gov (United States)

    Street, Amy E; Gradus, Jaimie L; Giasson, Hannah L; Vogt, Dawne; Resick, Patricia A

    2013-07-01

    The changing scope of women's roles in combat operations has led to growing interest in women's deployment experiences and post-deployment adjustment. To quantify the gender-specific frequency of deployment stressors, including sexual and non-sexual harassment, lack of social support and combat exposure. To quantify gender-specific post-deployment mental health conditions and associations between deployment stressors and posttraumatic stress disorder (PTSD), to inform the care of Veterans returning from the current conflicts. National mail survey of OEF/OIF Veterans randomly sampled within gender, with women oversampled. The community. In total, 1,207 female and 1,137 male Veterans from a roster of all Operation Enduring Freedom/Operation Iraqi Freedom (OEF/OIF) Veterans. Response rate was 48.6 %. Deployment stressors (including combat and harassment stress), PTSD, depression, anxiety and alcohol use, all measured via self-report. Women were more likely to report sexual harassment (OR = 8.7, 95% CI: 6.9, 11) but less likely to report combat (OR = 0.62, 95 % CI: 0.50, 0.76). Women and men were equally likely to report symptoms consistent with probable PTSD (OR = 0.87, 95 % CI: 0.70, 1.1) and symptomatic anxiety (OR = 1.1, 9 5% CI: 0.86, 1.3). Women were more likely to report probable depression (OR = 1.3, 95 % CI: 1.1, 1.6) and less likely to report problematic alcohol use (OR = 0.59, 9 5% CI: 0.47, 0.72). With a five-point change in harassment stress, adjusted odds ratios for PTSD were 1.36 (95 % CI: 1.23, 1.52) for women and 1.38 (95 % CI: 1.19, 1.61) for men. The analogous associations between combat stress and PTSD were 1.31 (95 % CI: 1.24, 1.39) and 1.31 (95 % CI: 1.26, 1.36), respectively. Although there are important gender differences in deployment stressors-including women's increased risk of interpersonal stressors-and post-deployment adjustment, there are also significant similarities. The post-deployment adjustment of our nation's growing population of

  4. Military Children’s Perceptions of Parents’ Frequent Missile Base Deployments

    Science.gov (United States)

    2017-04-26

    Tri-Service Nursing Research Program (TSNRP); Defense Medical Research & Development Program (DMRDP): NIH; Congressionally Directed Medical Research ...Medics - Mission Ready- Patient Focused +Past and Current Research +Parent Reported + Quantitative vs. Qualitative +Combat vs. Peacetime Deployments...Base Deployments presented at/published to TSNRP Research /EBP Dissemination Course, Ellicott City, MD, 25-26 April 2017 in accordance with MDWI 41

  5. Associations of contextual risk and protective factors with fathers’ parenting practices in the post-deployment environment

    Science.gov (United States)

    Davis, Laurel; Hanson, Sheila K.; Zamir, Osnat; Gewirtz, Abigail H.; DeGarmo, David S.

    2015-01-01

    Deployment separation and reunifications are salient contexts that directly impact effective family functioning and parenting for military fathers. Yet, we know very little about determinants of post-deployed father involvement and effective parenting. The present study examined hypothesized risk and protective factors of observed parenting for 282 post-deployed fathers who served in the Army National Guard/Reserves. Pre-intervention data were employed from fathers participating in the After Deployment, Adaptive Parenting Tools (ADAPT) randomized control trial. Parenting practices were obtained from direct observation of father-child interaction and included measures of problem solving, harsh discipline, positive involvement, encouragement, and monitoring. Risk factors included combat exposure, negative life events, months deployed, and PTSD symptoms. Protective factors included education, income, dyadic adjustment, and social support. Results of a structural equation model predicting an effective parenting construct indicated that months deployed, income, and father age were most related to observed parenting, explaining 16% of the variance. We are aware of no other study utilizing direct parent-child observations of father’s parenting skills following overseas deployment. Implications for practice and preventive intervention are discussed. PMID:26213794

  6. Evaluating PTSD on Reproductive Outcomes: Women Deployed in Iraq and Afghanistan

    Science.gov (United States)

    2009-10-01

    Center attacks and its effect on pregnancy outcome . Paediatric and Perinatal Epidemiology, 2005. 19(5): p. 334-41. 6. Xiong, X., et al., Exposure ...health system. Thus, the effect of women’s military service on reproductive outcomes is a key concern. Due to the unique situation of women in the... exposure to PTSD as a consequence of deployment is one example of recent concern. A recent study found women who had deployed to Iraq/Afghanistan

  7. The Long Tail Issue in Large Scale Deployment of Personal Informatics

    DEFF Research Database (Denmark)

    Cuttone, Andrea; Larsen, Jakob Eg

    2014-01-01

    We describe the challenges and the open questions arising during the design and deployment of SensibleJournal, a mobile personal informatics system with interactive visualizations of mobility and social interactions based on data acquired from embedded smartphone sensors. The SensibleJournal system...... was evaluated in a large scale (N=136) mobile sensing field study. We report issues in deployment, limitations in user engagement and uptake, and the challenges in measuring the effect of the system....

  8. Design and Deployment of Mobile FSO Communication System

    KAUST Repository

    Alheadary, Wael Ghazy

    2017-05-08

    As a potential solution to many applications, we developed a mobile free-space optical (FSO) system that achieves 1Gbps with transmission distance of 70 m. This system needs minimal preparation to be deployed within an hour.

  9. Design and Deployment of Mobile FSO Communication System

    KAUST Repository

    Alheadary, Wael Ghazy; Guo, Yong; Stegenburgs, Edgars; Park, Kihong; Ng, Tien Khee; Ooi, Boon S.; Alouini, Mohamed-Slim

    2017-01-01

    As a potential solution to many applications, we developed a mobile free-space optical (FSO) system that achieves 1Gbps with transmission distance of 70 m. This system needs minimal preparation to be deployed within an hour.

  10. Software as a service approach to sensor simulation software deployment

    Science.gov (United States)

    Webster, Steven; Miller, Gordon; Mayott, Gregory

    2012-05-01

    Traditionally, military simulation has been problem domain specific. Executing an exercise currently requires multiple simulation software providers to specialize, deploy, and configure their respective implementations, integrate the collection of software to achieve a specific system behavior, and then execute for the purpose at hand. This approach leads to rigid system integrations which require simulation expertise for each deployment due to changes in location, hardware, and software. Our alternative is Software as a Service (SaaS) predicated on the virtualization of Night Vision Electronic Sensors (NVESD) sensor simulations as an exemplary case. Management middleware elements layer self provisioning, configuration, and integration services onto the virtualized sensors to present a system of services at run time. Given an Infrastructure as a Service (IaaS) environment, enabled and managed system of simulations yields a durable SaaS delivery without requiring user simulation expertise. Persistent SaaS simulations would provide on demand availability to connected users, decrease integration costs and timelines, and benefit the domain community from immediate deployment of lessons learned.

  11. Interpersonal conflict and referrals to counseling among married soldiers following return from deployment.

    Science.gov (United States)

    Gibbs, Deborah A; Clinton-Sherrod, A Monique; Johnson, Ruby E

    2012-10-01

    Deployment represents a significant potential strain on military families. The impact of postdeployment stresses may be increased if family coping resources are diminished by returning service members' physical injuries, mental health issues, or substance abuse. This article examines the health and mental health correlates of self-reported concerns regarding interpersonal conflict among married soldiers following return from deployment and the likelihood that soldiers acknowledging such concerns are referred to counseling services. Among 20,166 married Army soldiers completing Post-Deployment Health Reassessments, 18% reported having experienced serious interpersonal conflict with their spouse, family members, close friends, or coworkers. Results indicate that interpersonal conflict was more common among those who reported health problems, depression, post-traumatic stress disorder, and alcohol abuse. Among soldiers reporting interpersonal conflict and not already receiving services, 11% were referred to service. Findings support the need to communicate with soldiers and their spouses about the availability of services following return from deployment and to continue efforts to reduce stigma associated with seeking treatment.

  12. Photodegradation of polyaromatic hydrocarbons in passive air samplers: Field testing different deployment chambers

    International Nuclear Information System (INIS)

    Bartkow, Michael E.; Kennedy, Karen E.; Huckins, James N.; Holling, Neil; Komarova, Tatiana; Mueller, Jochen F.

    2006-01-01

    Semi-permeable membrane devices (SPMDs) were loaded with deuterated anthracene and pyrene as performance reference compounds (PRCs) and deployed at a test site in four different chambers (open and closed box chamber, bowl chamber and cage chamber) for 29 days. The losses of PRCs and the uptake of polyaromatic hydrocarbons (PAHs) from the ambient air were quantified. UV-B levels measured in each deployment chamber indicated that SPMDs would be exposed to the most UV-B in the cage chamber and open box chamber. Significantly less PAHs were quantified in SPMDs deployed in the cage chamber and open box chamber compared to samplers from the other two chambers, suggesting that photodegradation of PAHs had occurred. The loss of PRCs confirmed these results but also showed that photodegradation was occurring in the closed box chamber. The bowl chamber appears to provide the best protection from the influence of direct photodegradation. - Photodegradation/loss of PAHs occurs from passive air samplers (SPMDs) deployed in various sampler chambers

  13. Deployment of military mothers: supportive and nonsupportive military programs, processes, and policies.

    Science.gov (United States)

    Goodman, Petra; Turner, Annette; Agazio, Janice; Throop, Meryia; Padden, Diane; Greiner, Shawna; Hillier, Shannon L

    2013-07-01

    Military mothers and their children cope with unique issues when mothers are deployed. In this article, we present mothers' perspectives on how military resources affected them, their children, and their caregivers during deployment. Mothers described beneficial features of military programs such as family readiness groups and behavioral health care, processes such as unit support, and policies on length and timing of deployments. Aspects that were not supportive included inflexibility in family care plans, using personal leave time and funds for transporting children, denial of release to resolve caretaker issues, and limited time for reintegration. We offer recommendations for enhanced support to these families that the military could provide. Reprint & Copyright © 2013 Association of Military Surgeons of the U.S.

  14. Towards the Ubiquitous Deployment of DNSSEC

    Science.gov (United States)

    2016-01-01

    and Session Initiation Protocol ( SIP ). However, it remains to be seen how quickly these enhancements are picked up and deployed. The second...Security RDI Resources for the DNSSEC Initiative System (the C&A system) RFC Request For Comments SIP Session Initiation Protocol SMTP Simple Mail...DISTRIBUTION UNLIMITED 1 Summary The Secure Extensions to the Domain Name System (DNSSEC) comprise of a set of protocol extensions that fix a

  15. Working paper : national costs of the metropolitan ITS infrastructure : updated with 2004 deployment data

    Science.gov (United States)

    The purpose of this report, "Working Paper National Costs of the Metropolitan ITS infrastructure: Updated with 2004 Deployment Data," is to update the estimates of the costs remaining to deploy Intelligent Transportation Systems (ITS) infrastructure ...

  16. An economic evaluation of alternative biofuel deployment scenarios in the USA

    Directory of Open Access Journals (Sweden)

    Gbadebo Oladosu

    2017-05-01

    Full Text Available Energy market conditions have shifted dramatically since the USA renewable fuel standards (RFS1 in 2005; RFS2 in 2007 were enacted. The USA has transitioned from an increasing dependence on oil imports to abundant domestic oil production. In addition, increases in the use of ethanol, the main biofuel currently produced in the USA, is now limited by the blend wall constraint. Given this, the current study evaluates alternative biofuel deployment scenarios in the USA, accounting for changes in market conditions. The analysis is performed with a general equilibrium model that reflects the structure of the USA biofuel market as the transition to advanced biofuels begins. Results suggest that ethanol consumption would increase, albeit slowly, if current biofuel deployment rates of about 10% are maintained as persistently lower oil prices lead to a gradual increase in the consumption of liquid transportation fuels. Without the blend wall constraint, this study finds that the overall economic impact of a full implementation of the USA RFS2 policy is largely neutral before 2022. However, the economic impacts become slightly negative under the blend wall constraint since more expensive bio-hydrocarbons are needed to meet the RFS2 mandates. Results for a scenario with reduced advanced biofuel deployment based on current policy plans show near neutral economic impacts up to 2027. This scenario is also consistent with another scenario where the volume of bio-hydrocarbons deployed is reduced to adjust for its higher cost and energy content relative to deploying the mandated RFS2 advanced biofuel volumes as ethanol. The important role of technological change is demonstrated under pioneer and accelerated technology scenarios, with the latter leading to neutral or positive economic effects up to 2023 under most blend wall scenarios. All scenarios evaluated in this study are found to have positive long-term benefits for the USA economy.

  17. An early deployment strategy for carbon capture, utilisation, and storage

    Energy Technology Data Exchange (ETDEWEB)

    Carter, L.D.

    2012-11-01

    This report describes the current use of CO2 for EOR, and discusses potential expansion of EOR using CO2 from power plants. Analysis of potential EOR development in the USA, where most current CO2-based EOR production takes place, indicates that relatively low cost, traditional sources of CO2 for EOR (CO2 domes and CO2 from natural gas processing plants) are insufficient to exploit the full potential of EOR. To achieve that full potential will require use of CO2 from combustion and gasification systems, such as fossil fuel power plants, where capture of CO2 is more costly. The cost of current CCUS systems, even with the revenue stream for sale of the CO2 for EOR, is too high to result in broad deployment of the technology in the near term. In the longer term, research and development may be sufficient to reduce CO2 capture costs to a point where CCUS would be broadly deployed. This report describes a case study of conditions in the USA to explore a financial incentive to promote early deployment of CCUS, providing a range of immediate benefits to society, greater likelihood of reducing the long-term cost of CCUS, and greater likelihood of broad deployment of CCUS and CCS in the long term. Additionally, it may be possible to craft such an incentive in a manner that its cost is more than offset by taxes flowing from increased domestic oil production. An example of such an incentive is included in this report.

  18. A Power Balance Aware Wireless Charger Deployment Method for Complete Coverage in Wireless Rechargeable Sensor Networks

    Directory of Open Access Journals (Sweden)

    Tu-Liang Lin

    2016-08-01

    Full Text Available Traditional sensor nodes are usually battery powered, and the limited battery power constrains the overall lifespan of the sensors. Recently, wireless power transmission technology has been applied in wireless sensor networks (WSNs to transmit wireless power from the chargers to the sensor nodes and solve the limited battery power problem. The combination of wireless sensors and wireless chargers forms a new type of network called wireless rechargeable sensor networks (WRSNs. In this research, we focus on how to effectively deploy chargers to maximize the lifespan of a network. In WSNs, the sensor nodes near the sink consume more power than nodes far away from the sink because of frequent data forwarding. This important power unbalanced factor has not been considered, however, in previous charger deployment research. In this research, a power balance aware deployment (PBAD method is proposed to address the power unbalance in WRSNs and to design the charger deployment with maximum charging efficiency. The proposed deployment method is effectively aware of the existence of the sink node that would cause unbalanced power consumption in WRSNs. The simulation results show that the proposed PBAD algorithm performs better than other deployment methods, and fewer chargers are deployed as a result.

  19. Childhood adversity and traumatic exposures during deployment as predictors of mental health in Australian military veterans.

    Science.gov (United States)

    Zheng, Wu Yi; Kanesarajah, Jeeva; Waller, Michael; McGuire, Annabel C; Treloar, Susan A; Dobson, Annette J

    2016-02-01

    To examine whether the relationship between traumatic exposure on deployment and poor mental health varies by the reported level of childhood adversity experienced in Australian military veterans deployed to the Bougainville or East Timor military operations. Cross-sectional self-reported survey data were collected in 2008 from 3,564 Australian military veterans who deployed to East Timor or Bougainville on their deployment experiences, health and recall of childhood events. Multivariable logistic regression was used to investigate the association between childhood adversity, deployment exposures and mental health. The most common childhood adversity reported was 'not having a special teacher, youth worker or family friend who looked out for them while growing up'. On average, responders reported experiencing 3.5 adverse childhood experiences (SD 2.7) and averaged 5.3 (SD 4.9) traumatic exposures on deployment. Both childhood adversity and traumatic exposures on deployment were associated with higher odds of poorer mental health. However, there was no evidence that level of childhood adversity modified the association between traumatic exposure and mental health. These findings suggest that military personnel who recalled a higher level of childhood adversity may need to be monitored for poor mental health and, if required, provided with appropriate support. © 2015 Public Health Association of Australia.

  20. Rapidly Evolving Distributed Systems by Bridging the Deployment Gap

    National Research Council Canada - National Science Library

    Wolf, Alexander

    2000-01-01

    .... The University of Colorado EDCS project has been successful in achieving its objective: producing innovative, useful, and interesting research results in the areas of software configuration and deployment...

  1. Rapidly Evolving Distributed Systems by Bridging the Deployment Gap

    National Research Council Canada - National Science Library

    Wolf, Alexander

    2001-01-01

    .... The University of Colorado EDCS project has been successful in achieving its objective; producing innovative, useful and interesting research results in the areas of software configuration and deployment...

  2. Investigating The Factors Impacting On The Development & Deployment Of ITS Solutions In Developing Countries

    DEFF Research Database (Denmark)

    Adjin, Daniel Michael Okwabi; Tadayoni, Reza; Tsivor, Kenneth

    2013-01-01

    . There are bundles of drivers for developing and deploying ITS solutions for technological advancement and societal modernization, as well as economic growth and sustainability for developing countries. Ironically, there also exit a number of barriers mitigating the development and deployment of ITS technologies...... in these countries. The main bottlenecks to deploying ITS applications in developing countries include: insufficient understanding of the potentials of ITS and its benefits due to lack of education and awareness, lack of financial resources, lack of technical support, difficulties in integrating ITS applications...

  3. Deployment-based lifetime optimization model for homogeneous Wireless Sensor Network under retransmission.

    Science.gov (United States)

    Li, Ruiying; Liu, Xiaoxi; Xie, Wei; Huang, Ning

    2014-12-10

    Sensor-deployment-based lifetime optimization is one of the most effective methods used to prolong the lifetime of Wireless Sensor Network (WSN) by reducing the distance-sensitive energy consumption. In this paper, data retransmission, a major consumption factor that is usually neglected in the previous work, is considered. For a homogeneous WSN, monitoring a circular target area with a centered base station, a sensor deployment model based on regular hexagonal grids is analyzed. To maximize the WSN lifetime, optimization models for both uniform and non-uniform deployment schemes are proposed by constraining on coverage, connectivity and success transmission rate. Based on the data transmission analysis in a data gathering cycle, the WSN lifetime in the model can be obtained through quantifying the energy consumption at each sensor location. The results of case studies show that it is meaningful to consider data retransmission in the lifetime optimization. In particular, our investigations indicate that, with the same lifetime requirement, the number of sensors needed in a non-uniform topology is much less than that in a uniform one. Finally, compared with a random scheme, simulation results further verify the advantage of our deployment model.

  4. Complex Deployed Responsive Service

    Science.gov (United States)

    Parry, Glenn; McLening, Marc; Caldwell, Nigel; Thompson, Rob

    A pizza restaurant must provide product, in the form of the food and drink, and service in the way this is delivered to the customer. Providing this has distinct operational challenges, but what if the restaurant also provides a home delivery service? The service becomes deployed as the customer is no-longer co-located with the production area. The business challenge is complicated as service needs to be delivered within a geographic region, to time or the pizza will be cold, and within a cost that is not ­prohibitive. It must also be responsive to short term demand; needing to balance the number of staff it has available to undertake deliveries against a forecast of demand.

  5. Improving Roadside Unit Deployment in Vehicular Networks by Exploiting Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Manuel Fogue

    2018-01-01

    Full Text Available Vehicular networks make use of the Roadside Units (RSUs to enhance the communication capabilities of the vehicles in order to forward control messages and/or to provide Internet access to vehicles, drivers and passengers. Unfortunately, within vehicular networks, the wireless signal propagation is mostly affected by buildings and other obstacles (e.g., urban fixtures, in particular when considering the IEEE 802.11p standard. Therefore, a crowded RSU deployment may be required to ensure vehicular communications within urban environments. Furthermore, some applications, notably those applications related to safety, require a fast and reliable warning data transmission to the emergency services and traffic authorities. However, communication is not always possible in vehicular environments due to the lack of connectivity even employing multiple hops. To overcome the signal propagation problem and delayed warning notification time issues, an effective, smart, cost-effective and all-purpose RSU deployment policy should be put into place. In this paper, we propose the genetic algorithm for roadside unit deployment (GARSUD system, which uses a genetic algorithm that is capable of automatically providing an RSU deployment suitable for any given road map layout. Our simulation results show that GARSUD is able to reduce the warning notification time (the time required to inform emergency authorities in traffic danger situations and to improve vehicular communication capabilities within different density scenarios and complexity layouts.

  6. iPad in the Enterprise Developing and Deploying Business Applications

    CERN Document Server

    Clevenger, Nathan

    2011-01-01

    Discover how to plan, design, develop, and deploy iPad apps for the enterprise Having taken the enterprise by storm, iPads are now in the hands of workers in virtually every level of companies in almost every industry. But using iPad apps in the enterprise is more complex than simply clicking an icon from the App Store. It presents unique challenges around software development, system integration, information security, application deployment, and device management. That's where this book comes in. iPhone Life Enterprise Editor and veteran mobile consultant Nathan Clevenger presents a guide for

  7. Deployment and Implementation Strategies for Massive MIMO in 5G

    DEFF Research Database (Denmark)

    Panzner, Berthold; Zirwas, Wolfgang; Dierks, Stefan

    2015-01-01

    for 5G is a successful and cost-efficient integration in the overall network concept. This work highlights deployment and implementation strategies for massive MIMO in the context of 5G indoor small cell scenarios. Different massive MIMO deployment scenarios are analyzed for a standard 3GPP indoor...... to spatial streams is varied stepwise from equality to a factor of ten. For implementation of massive MIMO in 5G networks trends in beamforming techniques, mutually coupled subarrays, over the calibration procedure and estimated ADC performance in 2020 time-frame are discussed. Based on the debate the paper...

  8. Flexible, Phase Change Fabric for Deployable Decelerators, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — SDMA proposes to develop a flexible fabric containing Phase Change Materials that is suitable for use on Deployable Decelerators. This technology will make...

  9. Deploying ICT with Entrepreneurship Culture can Fight Cyber-Crime ...

    African Journals Online (AJOL)

    Deploying ICT with Entrepreneurship Culture can Fight Cyber-Crime Menace ... Again he innovates, introducing new products & technologies by the ... Keywords: Cyber-crimes, entrepreneurs, compupreneur, firewalls, computer forensics, ICT, ...

  10. A pilot survey of post-deployment health care needs in small community-based primary care clinics

    Directory of Open Access Journals (Sweden)

    Pugh Mary J

    2011-07-01

    Full Text Available Abstract Background Relatively little is known regarding to what extent community-based primary care physicians are encountering post-deployment health care needs among veterans of the Afghanistan or Iraq conflicts and their family members. Methods This pilot study conducted a cross-sectional survey of 37 primary care physicians working at small urban and suburban clinics belonging to a practice-based research network in the south central region of Texas. Results Approximately 80% of the responding physicians reported caring for patients who have been deployed to the Afghanistan or Iraq war zones, or had a family member deployed. Although these physicians noted a variety of conditions related to physical trauma, mental illnesses and psychosocial disruptions such as marital, family, financial, and legal problems appeared to be even more prevalent among their previously deployed patients and were also noted among family members of deployed veterans. Conclusions Community-based primary care physicians should be aware of common post-deployment health conditions and the resources that are available to meet these needs.

  11. Integrated assessment of dispersed energy resources deployment

    Energy Technology Data Exchange (ETDEWEB)

    Marnay, Chris; Blanco, Raquel; Hamachi, Kristina S.; Kawaan, Cornelia P.; Osborn, Julie G.; Rubio, F. Javier

    2000-06-01

    The goal of this work is to create an integrated framework for forecasting the adoption of distributed energy resources (DER), both by electricity customers and by the various institutions within the industry itself, and for evaluating the effect of this adoption on the power system, particularly on the overall reliability and quality of electrical service to the end user. This effort and follow on contributions are intended to anticipate and explore possible patterns of DER deployment, thereby guiding technical work on microgrids towards the key technical problems. An early example of this process addressed is the question of possible DER adopting customer disconnection. A deployment scenario in which many customers disconnect from their distribution company (disco) entirely leads to a quite different set of technical problems than a scenario in which customers self generate a significant share or all of their on-site electricity requirements and additionally buy and sell energy and ancillary services (AS) locally and/or into wider markets. The exploratory work in this study suggests that the economics under which customers disconnect entirely are unlikely.

  12. Influence of military component and deployment-related experiences on mental disorders among Canadian military personnel who deployed to Afghanistan: a cross-sectional survey.

    Science.gov (United States)

    Boulos, David; Fikretoglu, Deniz

    2018-03-12

    The primary objective was to explore differences in mental health problems (MHP) between serving Canadian Armed Forces (CAF) components (Regular Force (RegF); Reserve Force (ResF)) with an Afghanistan deployment and to assess the contribution of both component and deployment experiences to MHP using covariate-adjusted prevalence difference estimates. Additionally, mental health services use (MHSU) was descriptively assessed among those with a mental disorder. Data came from the 2013 CAF Mental Health Survey, a cross-sectional survey of serving personnel (n=72 629). Analyses were limited to those with an Afghanistan deployment (population n=35 311; sampled n=4854). Logistic regression compared MHP between RegF and ResF members. Covariate-adjusted prevalence differences were computed. The primary outcomes were MHP, past-year mental disorders, identified using the WHO's Composite International Diagnostic Interview, and past-year suicide ideation. ResF personnel were less likely to be identified with a past-year anxiety disorder (adjusted OR (AOR)=0.72 (95% CI 0.58 to 0.90)), specifically both generalised anxiety disorder and panic disorder, but more likely to be identified with a past-year alcohol abuse disorder (AOR=1.63 (95% CI 1.04 to 2.58)). The magnitude of the covariate-adjusted disorder prevalence differences for component was highest for the any anxiety disorder outcome, 2.8% (95% CI 1.0 to 4.6); lower for ResF. All but one deployment-related experience variable had some association with MHP. The 'ever felt responsible for the death of a Canadian or ally personnel' experience had the strongest association with MHP; its estimated covariate-adjusted disorder prevalence difference was highest for the any (of the six measured) mental disorder outcome (11.2% (95% CI 6.6 to 15.9)). Additionally, ResF reported less past-year MHSU and more past-year civilian MHSU. Past-year MHP differences were identified between components. Our findings suggest that although

  13. The Impact of Military Deployment and Reintegration on Children and Parenting: A Systematic Review

    Science.gov (United States)

    Creech, Suzannah K.; Hadley, Wendy; Borsari, Brian

    2015-01-01

    Hundreds of thousands of children have had at least 1 parent deploy as part of military operations in Iraq (Operation Iraqi Freedom; OIF; Operation New Dawn; OND) and Afghanistan (Operation Enduring Freedom; OEF). However, there is little knowledge of the impact of deployment on the relationship of parents and their children. This systematic review examines findings from 3 areas of relevant research: the impact of deployment separation on parenting, and children's emotional, behavioral, and health outcomes; the impact of parental mental health symptoms during and after reintegration; and current treatment approaches in veteran and military families. Several trends emerged. First, across all age groups, deployment of a parent may be related to increased emotional and behavioral difficulties for children, including higher rates of health-care visits for psychological problems during deployment. Second, symptoms of PTSD and depression may be related to increased symptomatology in children and problems with parenting during and well after reintegration. Third, although several treatments have been developed to address the needs of military families, most are untested or in the early stages of implementation and evaluation. This body of research suggests several promising avenues for future research. PMID:25844014

  14. iPhone with Microsoft Exchange Server 2010 Business Integration and Deployment

    CERN Document Server

    Goodman, Steve

    2012-01-01

    iPhone with Microsoft Exchange Server 2010 - Business Integration and Deployment is a practical, step-by-step tutorial on planning, installing and configuring Exchange Server to deploy iPhones into your business. This book is aimed at system administrators who don't necessarily know about Exchange Server 2010 or ActiveSync-based mobile devices. A basic level of knowledge around Windows Servers is expected, and knowledge of smartphones and email systems in general will make some topics a little easier.

  15. On Efficient Deployment of Wireless Sensors for Coverage and Connectivity in Constrained 3D Space.

    Science.gov (United States)

    Wu, Chase Q; Wang, Li

    2017-10-10

    Sensor networks have been used in a rapidly increasing number of applications in many fields. This work generalizes a sensor deployment problem to place a minimum set of wireless sensors at candidate locations in constrained 3D space to k -cover a given set of target objects. By exhausting the combinations of discreteness/continuousness constraints on either sensor locations or target objects, we formulate four classes of sensor deployment problems in 3D space: deploy sensors at Discrete/Continuous Locations (D/CL) to cover Discrete/Continuous Targets (D/CT). We begin with the design of an approximate algorithm for DLDT and then reduce DLCT, CLDT, and CLCT to DLDT by discretizing continuous sensor locations or target objects into a set of divisions without sacrificing sensing precision. Furthermore, we consider a connected version of each problem where the deployed sensors must form a connected network, and design an approximation algorithm to minimize the number of deployed sensors with connectivity guarantee. For performance comparison, we design and implement an optimal solution and a genetic algorithm (GA)-based approach. Extensive simulation results show that the proposed deployment algorithms consistently outperform the GA-based heuristic and achieve a close-to-optimal performance in small-scale problem instances and a significantly superior overall performance than the theoretical upper bound.

  16. Modeling deployment of Pierce’s disease resistant grapevines

    Science.gov (United States)

    Deployment of Pierce’s disease resistant grapevines is a key solution to mitigating economic losses caused by Xylella fastidiosa. While Pierce’s disease resistant grapevines under development display mild symptoms and have lower bacterial populations than susceptible varieties, all appear to remain ...

  17. DEPLOYMENT OF VOIP ON WIRELINE NETWORK USING OPNET

    African Journals Online (AJOL)

    EKPAH

    study of VoIP traffic and other major devices. These results will ... pre-deployment analysis, planning and lack of ... given network under VoIP and data load traffic. OPNET contains a vast amount of models of .... There are a number of tools.

  18. Post-deployment usability evaluation of a radiology workstation

    NARCIS (Netherlands)

    Jorritsma, Wiard; Cnossen, Fokie; Dierckx, Rudi A.; Oudkerk, Matthijs; Van Ooijen, Peter M. A.

    Objectives: To determine the number, nature and severity of usability issues radiologists encounter while using a commercially available radiology workstation in clinical practice, and to assess how well the results of a pre-deployment usability evaluation of this workstation generalize to clinical

  19. Towards robot-assisted anchor deployment in beating-heart mitral valve surgery.

    Science.gov (United States)

    Cheng, Lingbo; Sharifi, Mojtaba; Tavakoli, Mahdi

    2018-06-01

    Beating-heart intracardiac surgery promises significant benefits for patients compared with cardiopulmonary bypass based procedures. However, the fast motions of the heart introduce serious challenges for surgeons. In this work, a new impedance-controlled master-slave telerobotic system is developed to help perform anchor deployment for mitral valve annuloplasty under the guidance of live ultrasound images of the heart. The proposed bilateral teleoperation system can both reflect the non-oscillatory portion of slave-heart tissue interaction force on the surgeon's hand as haptic feedback and implement rapid compensation for the beating heart's motion. The surgical task involves performing anchor deployment on a simulated moving heart tissue to evaluate the effectiveness of the proposed strategy for safely interacting with a moving organ. The results obtained show that the telerobotic system increases the success rate of anchor deployment by 100% and reduces the excess force application rate by 70% compared with manual attempts. Copyright © 2018 John Wiley & Sons, Ltd.

  20. Wheeling and Banking Strategies for Optimal Renewable Energy Deployment. International Experiences

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, Jenny [National Renewable Energy Lab. (NREL), Golden, CO (United States); Vora, Ravi [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mathur, Shivani [National Renewable Energy Lab. (NREL), Golden, CO (United States); Madrigal, Paola [Energy Regulatory Commission (Mexico); Chatterjee, Sushanta K. [Central Electricity Regulatory Commission (India); Shah, Rakesh [SunEdison, Mumbai (India)

    2016-03-01

    This paper defines the principles of wheeling (i.e., transmission) tariffs and renewable energy (RE) banking provisions and their role in RE deployment in countries with plans for large-scale RE. It reviews experiences to date in the United States, Mexico, and India and discusses key policy and regulatory considerations for devising more effective wheeling and/or banking provisions for countries with ambitious RE deployment targets. The paper addresses the challenges of competing needs of stakeholders, especially those of RE generators, distribution utilities, and transmission network owners and operators. The importance of wheeling and banking and their effectiveness for financial viability of RE deployment is also explored. This paper aims to benefit policymakers and regulators as well as key renewable energy stakeholders. Key lessons for regulators include: creating long-term wheeling and banking policy certainty, considering incentivizing RE through discounted transmission access, and assessing the cost implications of such discounts, as well as expanding access to renewable energy customers.