WorldWideScience

Sample records for rights management systems

  1. An Introduction to Digital Rights Management Systems

    NARCIS (Netherlands)

    Jonker, Willem

    2007-01-01

    This chapter gives a concise introduction to digital rights management (DRM) systems by first presenting the basic ingredients of the architecture of DRM systems for (audio and/or video) content delivery, followed by an introduction to two open-standard DRM systems, one developed in the mobile world

  2. Choosing the right system to manage electricity derivatives

    International Nuclear Information System (INIS)

    Vasey, G.

    1998-01-01

    The alternatives available and the considerations entering into the choice of the right system to manage electricity derivatives are reviewed. The choice of system will be influenced by a variety of factors, among them : (1) business issues, (2) business processes, (3) functionality, (4) technology, (5) integration into the enterprise, and (6) internal and external competition. The system chosen will need to be integrated into the enterprise. Beyond that,it will need executive commitment, dedicated internal resources, qualified assistance from the vendor, willingness to revisit the business processes and make changes when needed, and training and more training. Some factors to take into account when choosing a system vendor are also discussed. Among these good fit to business, system performance, flexibility, reliability, and customization capacity are the most important

  3. RBAC-Matrix-based EMR right management system to improve HIPAA compliance.

    Science.gov (United States)

    Lee, Hung-Chang; Chang, Shih-Hsin

    2012-10-01

    Security control of Electronic Medical Record (EMR) is a mechanism used to manage electronic medical records files and protect sensitive medical records document from information leakage. Researches proposed the Role-Based Access Control(RBAC). However, with the increasing scale of medical institutions, the access control behavior is difficult to have a detailed declaration among roles in RBAC. Furthermore, with the stringent specifications such as the U.S. HIPAA and Canada PIPEDA etc., patients are encouraged to have the right in regulating the access control of his EMR. In response to these problems, we propose an EMR digital rights management system, which is a RBAC-based extension to a matrix organization of medical institutions, known as RBAC-Matrix. With the aim of authorizing the EMR among roles in the organization, RBAC-Matrix also allow patients to be involved in defining access rights of his records. RBAC-Matrix authorizes access control declaration among matrix organizations of medical institutions by using XrML file in association with each EMR. It processes XrML rights declaration file-based authorization of behavior in the two-stage design, called master & servant stage, thus makes the associated EMR to be better protected. RBAC-Matrix will also make medical record file and its associated XrML declaration to two different EMRA(EMR Authorization)roles, namely, the medical records Document Creator (DC) and the medical records Document Right Setting (DRS). Access right setting, determined by the DRS, is cosigned by the patient, thus make the declaration of rights and the use of EMR to comply with HIPAA specifications.

  4. Pervasive Application Rights Management Architecture

    OpenAIRE

    Dusparic, Ivana

    2005-01-01

    This dissertation describes an application rights management architecture that combines license management with digital rights management to provide an integrated platform for the specification, generation, delivery and management of application usage rights for pervasive computing environments. A new rights expression language is developed, extended from the existing language, ODRL, which allows the expression of mobile application usage rights and supports fine-grained usage ...

  5. Security Attributes Based Digital Rights Management

    NARCIS (Netherlands)

    Chong, C.N.; van Buuren, R.; van Buuren, R.F.; Hartel, Pieter H.; Kleinhuis, Geert; Boavida, F.; Monteiro, E.; Orvalho, J.

    2002-01-01

    Most real-life systems delegate responsibilities to different authorities. We apply this model to a digital rights management system, to achieve flexible security. In our model a hierarchy of authorities issues certificates that are linked by cryptographic means. This linkage establishes a chain of

  6. Security Attributes Based Digital Rights Management

    NARCIS (Netherlands)

    Chong, C.N.; van Buuren, R.; Hartel, Pieter H.; Kleinhuis, Geert

    ost real-life systems delegate responsibilities to di�erent authorities. We apply this model to a dig- ital rights management system, to achieve exible security. In our model a hierarchy of authorities issues certi�cates that are linked by cryptographic means. This linkage establishes a chain of

  7. Design principles and issues of rights expression languages for digital rights management

    Science.gov (United States)

    Wang, Xin

    2005-07-01

    Digital rights management (DRM) provides a unified approach to specifying, interpreting, enforcing and managing digital rights throughout the entire life cycle of digital assets. Using a declarative rights expression language (REL) for specifying rights and conditions in the form of licenses, as opposite to some other approaches (such as data structures and imperative languages), has been considered and adopted as a superior technology for implementing effective, interoperable and scalable DRM systems. This paper discusses some principles and issues for designing RELs, based on the experiences of developing a family of REL"s (DPRL, XrML 1.x, XrML 2.0 and MPEG REL). It starts with an overview of a family tree of the past and current REL"s, and their development history, followed by an analysis of their data models and a comparison with access-control oriented models. It then presents a number of primary design principles such as syntactic and semantic un-ambiguity, system interoperability, expressiveness in supporting business models and future extensibility, and discusses a number of key design issues such as maintaining stateful information, multi-tier issuance of rights, meta rights, identification of individual and aggregate objects, late-binding of to-beidentified entities, as well as some advanced ones on revocation and delegation of rights. The paper concludes with some remarks on REL profiling and extension for specific application domains.

  8. Effective Rights Exporting Process - Towards system interoperability of digital rights management

    OpenAIRE

    Lu, Wenhui

    2016-01-01

    Digitaalisten käyttöoikeuksien tehokas hallinta Digitaalisten käyttöoikeuksien hallinta (Digital Rights Management, DRM) on joukko menetelmiä, joilla hallitaan digitaalisen sisällön käyttöä ja jakelua. Eri menetelmien yhteen toimivuuden puute on hyvin todettu liiketoiminnallisesta, laillisesta ja teknologisesta näkökulmasta. Työn aihe, käyttöoikeuksien siirto, on keskinen DRM-järjestelmien järjestelmätason yhteen toimivuuden osa. Työssä kehitetään menetelmiä sellaisiin digitaaliste...

  9. Collective management of copyright and related rights

    CERN Document Server

    2010-01-01

    In the course of the last decade, collective management organizations (CMOs) have become the nerve centres of copyright licensing in virtually every country. Their expertise and knowledge of copyright law and management have proven essential to make copyright work in the digital age. This book, an extensively revised and updated edition of the only major work on the legal status of CMOs, offers an indepth analysis of the various operating CMO models, their rights and obligations vis-a-vis both users and members, acquisition of legal authority to license, and (most important) the rights to license digital uses of protected material and build (or improve current) information systems to deal with ever more complex rights management and licensing tasks. All the chapters have been updated since the 2005 edition, and a new chapter on multiterritorial licensing has been added. Factors considered include the following: * role of 'families' such as the International Confederation of Societies of Authors and Composers ...

  10. Controlled sharing of personal content using digital rights management

    NARCIS (Netherlands)

    Conrado, C.; Petkovic, M.; Veen, van der M.; Velde, van der W.H.

    2006-01-01

    This paper describes a system which allows controlled distribution of personal digital content by users. The system extends an existing Digital Rights Management system for the protection of commercial copyrighted content by essentially allowing users to become content providers. This fact, however,

  11. Intellectual Property Rights Management

    DEFF Research Database (Denmark)

    Alkærsig, Lars; Beukel, Karin; Reichstein, Toke

    Intellectual Property Rights Management explores how the entire toolbox of intellectual property (IP) protection and management are successfully combined and how firms generate value from IP. In particular, this book provides a framework of archetypes which firms will be able to self...

  12. Digital Rights Management

    NARCIS (Netherlands)

    Koster, P.; Jonker, Willem; Blanken, Henk; de Vries, A.P.; Blok, H.E.; Feng, L.

    2007-01-01

    Digital Rights Management, or DRM for short, is a much-discussed topic nowadays. The main reason for this is that DRM technology is often mentioned in the context of protection of digital audio and video content, for example to avoid large scale copying of CDs and DVDs via peer-to-peer networks in

  13. Defect and Innovation of Water Rights System

    Institute of Scientific and Technical Information of China (English)

    Zhou Bin

    2008-01-01

    The rare deposition of water resources conflicts with its limitless demand. This determined the existence of the water rights transaction system. The implementation of the water rights transaction system requires clarifying the definition of water re-source fight above all distinctly. At present, it is a kind of common right system arrangement which needs the Chinese government to dispose of water resources. Though a series of management sys-tems guaranteed the government's supply of water resource, it hindered the development of the water market seriously and caused the utilization of water resources to stay in the inefficient or low efficient state for a long time. Thus, we should change the government's leading role in the resource distribution and really rely on the market to carry on the water rights trade and transac-tion. In this way, the water rights could become a kind of private property right relatively, and circulate freely in the market. As a result of this, we should overcome the defects of common right, make its external performance internalized maximally and achieve the optimized water resource disposition and use it more effec-tively.

  14. Pain management: a fundamental human right.

    Science.gov (United States)

    Brennan, Frank; Carr, Daniel B; Cousins, Michael

    2007-07-01

    This article surveys worldwide medical, ethical, and legal trends and initiatives related to the concept of pain management as a human right. This concept recently gained momentum with the 2004 European Federation of International Association for the Study of Pain (IASP) Chapters-, International Association for the Study of Pain- and World Health Organization-sponsored "Global Day Against Pain," where it was adopted as a central theme. We survey the scope of the problem of unrelieved pain in three areas, acute pain, chronic noncancer pain, and cancer pain, and outline the adverse physical and psychological effects and social and economic costs of untreated pain. Reasons for deficiencies in pain management include cultural, societal, religious, and political attitudes, including acceptance of torture. The biomedical model of disease, focused on pathophysiology rather than quality of life, reinforces entrenched attitudes that marginalize pain management as a priority. Strategies currently applied for improvement include framing pain management as an ethical issue; promoting pain management as a legal right, providing constitutional guarantees and statutory regulations that span negligence law, criminal law, and elder abuse; defining pain management as a fundamental human right, categorizing failure to provide pain management as professional misconduct, and issuing guidelines and standards of practice by professional bodies. The role of the World Health Organization is discussed, particularly with respect to opioid availability for pain management. We conclude that, because pain management is the subject of many initiatives within the disciplines of medicine, ethics and law, we are at an "inflection point" in which unreasonable failure to treat pain is viewed worldwide as poor medicine, unethical practice, and an abrogation of a fundamental human right.

  15. Effort rights-based management

    DEFF Research Database (Denmark)

    Squires, Dale; Maunder, Mark; Allen, Robin

    2017-01-01

    Effort rights-based fisheries management (RBM) is less widely used than catch rights, whether for groups or individuals. Because RBM on catch or effort necessarily requires a total allowable catch (TAC) or total allowable effort (TAE), RBM is discussed in conjunction with issues in assessing fish...... populations and providing TACs or TAEs. Both approaches have advantages and disadvantages, and there are trade-offs between the two approaches. In a narrow economic sense, catch rights are superior because of the type of incentives created, but once the costs of research to improve stock assessments...

  16. Coupling biophysical processes and water rights to simulate spatially distributed water use in an intensively managed hydrologic system

    Science.gov (United States)

    Han, Bangshuai; Benner, Shawn G.; Bolte, John P.; Vache, Kellie B.; Flores, Alejandro N.

    2017-07-01

    Humans have significantly altered the redistribution of water in intensively managed hydrologic systems, shifting the spatiotemporal patterns of surface water. Evaluating water availability requires integration of hydrologic processes and associated human influences. In this study, we summarize the development and evaluation of an extensible hydrologic model that explicitly integrates water rights to spatially distribute irrigation waters in a semi-arid agricultural region in the western US, using the Envision integrated modeling platform. The model captures both human and biophysical systems, particularly the diversion of water from the Boise River, which is the main water source that supports irrigated agriculture in this region. In agricultural areas, water demand is estimated as a function of crop type and local environmental conditions. Surface water to meet crop demand is diverted from the stream reaches, constrained by the amount of water available in the stream, the water-rights-appropriated amount, and the priority dates associated with particular places of use. Results, measured by flow rates at gaged stream and canal locations within the study area, suggest that the impacts of irrigation activities on the magnitude and timing of flows through this intensively managed system are well captured. The multi-year averaged diverted water from the Boise River matches observations well, reflecting the appropriation of water according to the water rights database. Because of the spatially explicit implementation of surface water diversion, the model can help diagnose places and times where water resources are likely insufficient to meet agricultural water demands, and inform future water management decisions.

  17. User rights management of the CSNS control system client

    International Nuclear Information System (INIS)

    Zhang Zhuoyu; Liu Minqian; Chu Yuanping; Zhuang Jian; Hu Lei; Jin Dapeng

    2012-01-01

    The China Spallation Neutron Source (CSNS) will become the first pulsed spallation neutron source owned by China, CSS (Control System Studio), used as the the target station and spectrometer control system client, is mainly responsible for equipment controlling and parameter monitoring. In order to ensure the safety of the control system, the advanced GUI and important operating parameters must be restricted to ordinary users, only senior experts have the rights to view and modify them, so we must divide CSS users into different groups and give different rights to different groups. Based on user roles, CSS can implicit workbench contents and widgets, to ensure that users can seamlessly log into different clients. This article mainly talk about the JAAS authentication and authorization services in CSS, and deploy user information and master-slave synchronization information on the LDAP server, and use the Eclipse activity extension points to accomplish GUI explicit-implicit control according to the logged in user. (authors)

  18. Juvenile justice: "continent" institucional management a guarantor proposal of human rights

    Directory of Open Access Journals (Sweden)

    Ana Paula Motta Costa

    2016-12-01

    Full Text Available This article addresses the issue of management in socio-educative institutions for adolescents involved in the juvenile criminal system. This is one of the main challenges encountered in the field of protection of children and adolescents’ rights in Brazil. To make institutional management possible in the Socio-Educational System in a way which possibilitates the achievement of the system’s goals, the establishment of a management model that time mobilizes all personnel around common guidelines, in a democratic and participatory manner which enables “institutional continence” is necessary. Considering the historical reality of the institutions responsible for implementing socio-educative measures in Brazil, institutional management of these entities requires a working methodology that stipulates instances of decision and participation. Therefore, this article seeks to provide information that will enable its readers to reflect on the socio-educative institutions, establishing mechanisms for a management methodology that guarantees the effectiveness of the rights of adolescents and considers the specificity of each institution, as well as local circumstances by which it is surrounded.

  19. An Incomplete Cryptography based Digital Rights Management with DCFF

    OpenAIRE

    Thanh, Ta Minh; Iwakiri, Munetoshi

    2014-01-01

    In general, DRM (Digital Rights Management) system is responsible for the safe distribution of digital content, however, DRM system is achieved with individual function modules of cryptography, watermarking and so on. In this typical system flow, it has a problem that all original digital contents are temporarily disclosed with perfect condition via decryption process. In this paper, we propose the combination of the differential codes and fragile fingerprinting (DCFF) method based on incompl...

  20. Choosing a Digital Asset Management System That's Right for You

    Science.gov (United States)

    Kaplan, Deborah

    2009-01-01

    Planning is necessary in selecting the appropriate digital asset management system for your institution. Key issues one should consider in planning: the objects to be stored, where they come from, and how they will be accessed; the end users; and the needed staffing levels for system maintenance. During the development of the system requirements,…

  1. Rights & Responsibilities. Personnel Management Module.

    Science.gov (United States)

    Barker, Gale; And Others

    This module on rights and responsibilities is intended to introduce the hospitality manager or supervisor to sound personnel management practices that comply with the law. The material is presented in a self-instructional format in seven sections. At the beginning of each section is a statement of the objectives that will be achieved as a result…

  2. Intellectual Property Rights Management

    DEFF Research Database (Denmark)

    Alkærsig, Lars; Beukel, Karin; Reichstein, Toke

    -identify with and which will allow companies to focus on the IP and IP Management issues most relevant to them. By doing so, the authors offer further insights as to the use of IP and IP management practices across firms. By looking at empirical data covering the population of firms, the findings not only pertain......Intellectual Property Rights Management explores how the entire toolbox of intellectual property (IP) protection and management are successfully combined and how firms generate value from IP. In particular, this book provides a framework of archetypes which firms will be able to self...... to large organization but also reflect the practices and operations that reside in SMEs. This volume also utilizes labor market and firm data to determine whether there is a definitive relationship between IP and economic performance on the firm level....

  3. Marlin: Towards Seamless Content Sharing and Rights Management

    NARCIS (Netherlands)

    Keoh, S.L.

    2011-01-01

    Digital Rights Management (DRM) is used to protect copyrighted content from unauthorized use. However, it is still remains challenging to strike a balance between content sharing and rights management. Marlin is developing open standards for interoperable DRM technology.The Octopus and Nemo

  4. A comprehensive Software Copy Protection and Digital Rights Management platform

    Directory of Open Access Journals (Sweden)

    Ayman Mohammad Bahaa-Eldin

    2014-09-01

    Full Text Available This article proposes a Powerful and Flexible System for Software Copy Protection (SCP and Digital Rights Management (DRM based on Public Key Infrastructure (PKI standards. Software protection is achieved through a multi-phase methodology with both static and dynamic processing of the executable file. The system defeats most of the attacks and cracking techniques and makes sure that the protected software is never in a flat form, with a suitable portion of it always being encrypted during execution. A novel performance-tuning algorithm is proposed to lower the overhead of the protection process to its minimum depending on the software dynamic execution behavior. All system calls to access resources and objects such as files, and input/output devices are intercepted and encapsulated with secure rights management code to enforce the required license model. The system can be integrated with hardware authentication techniques (like dongles, and to Internet based activation and DRM servers over the cloud. The system is flexible to apply any model of licensing including state-based license such as expiration dates and number of trials. The usage of a standard markup language (XrML to describe the license makes it easier to apply new licensing operations like re-sale and content rental.

  5. Managing organizational culture within a management system

    International Nuclear Information System (INIS)

    Comeau, L.; Watts, G.

    2009-01-01

    The Point Lepreau Generating Station (PLGS) is currently undergoing a major refurbishment of its nuclear reactor. At the same time, a small team is designing the organization that will operate the plant after refurbishment. This paper offers a high level overview of the Post-Refurbishment Organization (PRO) project and will focus primarily on the approach used to address organizational culture and human system dynamics. We will describe how various tools, used to assess organization culture, team performance, and individual self-understanding, are used collectively to place the right person in the right position. We will explain how the career system, Pathfinder, is used to integrate these tools to support a comprehensive model for organization design and development. Finally, we demonstrate how the management of organizational cultural and human system dynamics are integrated into the PLGS Integrated Management System. (author)

  6. Systemic Right Ventricle in Adults With Congenital Heart Disease: Anatomic and Phenotypic Spectrum and Current Approach to Management.

    Science.gov (United States)

    Brida, Margarita; Diller, Gerhard-Paul; Gatzoulis, Michael A

    2018-01-30

    The systemic right ventricle (SRV) is commonly encountered in congenital heart disease representing a distinctly different model in terms of its anatomic spectrum, adaptation, clinical phenotype, and variable, but overall guarded prognosis. The most common clinical scenarios where an SRV is encountered are complete transposition of the great arteries with previous atrial switch repair, congenitally corrected transposition of the great arteries, double inlet right ventricle mostly with previous Fontan palliation, and hypoplastic left heart syndrome palliated with the Norwood-Fontan protocol. The reasons for the guarded prognosis of the SRV in comparison with the systemic left ventricle are multifactorial, including distinct fibromuscular architecture, shape and function, coronary artery supply mismatch, intrinsic abnormalities of the tricuspid valve, intrinsic or acquired conduction abnormalities, and varied SRV adaptation to pressure or volume overload. Management of the SRV remains an ongoing challenge because SRV dysfunction has implications on short- and long-term outcomes for all patients irrespective of underlying cardiac morphology. SRV dysfunction can be subclinical, underscoring the need for tertiary follow-up and timely management of target hemodynamic lesions. Catheter interventions and surgery have an established role in selected patients. Cardiac resynchronization therapy is increasingly used, whereas pharmacological therapy is largely empirical. Mechanical assist device and heart transplantation remain options in end-stage heart failure when other management strategies have been exhausted. The present report focuses on the SRV with its pathological subtypes, pathophysiology, clinical features, current management strategies, and long-term sequelae. Although our article touches on issues applicable to neonates and children, its main focus is on adults with SRV. © 2018 American Heart Association, Inc.

  7. Using Private Rights to Manage Natural Resources: Is Stewardship Linked to Ownership?

    Directory of Open Access Journals (Sweden)

    Patrick W. Gilmour

    2012-09-01

    Full Text Available There is increasing interest in privatizing natural resource systems to promote sustainability and conservation goals. Though economic theory suggests owners of private property rights have an incentive to act as resource stewards, few studies have tested this empirically. This paper asks whether private rights-owners were more conservative with respect to their management opinions than nonrights-owners in five Australian abalone (Haliotis spp. fisheries. Multiple regression analyses were used to link opinions to demographic, economic, and attitudinal variables. In contrast to standard economic assumptions, nonrights-owners suggested more conservative catch limits than did rights-owners, confirming qualitative observations of behavior in management workshops. Differing views about the condition of the resource and differing levels of experience contributed to these results. The first of its kind, this study directly demonstrates that private rights do not necessarily promote the greatest level of stewardship. This has substantial implications for how natural resources are governed globally, but also warns against applying simplistic behavioral assumptions to complex social-ecological systems.

  8. Water-right and water-allocation procedures of farmers' managed perennial spate irrigation systems of mithawan watershed, D.G. Khan, Pakistan

    International Nuclear Information System (INIS)

    Ahmad, M.; Ahmad, S.

    2007-01-01

    A study was conducted on water rights, water allocation and local institutions prevailing in the perennial spate irrigation systems of Mithawan watershed o D.G. Khan District of Punjab. The Study Area was selected is the Mthawan watershed on the D.G. Khan-Quetta Road almost 70 kms from D.G. Khan and 10 km away from the road, representing real-life operating systems. Small-scale isolated and large-scale contiguous perennial spate irrigation systems were selected for study. A three-prong methodology was designed covering (a) interactive dialogue of the focus groups to document the community-perceptions regarding systems water-rights, water allocation and local institution prevailing in the area; (b) structured interviews to document systematic data regarding some of the study-aspects; and (c) diagnostic surveys to document some of the measured data regarding scheme performance. Water rights and allocation procedures both in small-scale isolated and large-scale Contiguous perennial spate irrigation-system are very clearly defined and do not change with time and space. Local institutions like Biradri and Muchi take care of just allocation of water. An irrigator is deputed who takes care of allocated time among various tribes. At the same time, the community is bringing more area under irrigation. Obviously it has increased water-requirements and in turn management of irrigation system. Previously they were reconstructing the diversion structure only. Present expansion in irrigated area has increased the necessity of maintaining the water-conveyance network more frequently, particularly at critical sections. However, the realization regarding water-losses still needs to be promoted. The linkages of resource-management with water-productivity are going to be the future area of consideration in theses systems, due to expansion of the system largely because of increased population and urge to increase their livelihood. (author)

  9. 5 CFR 9701.511 - Management rights.

    Science.gov (United States)

    2010-01-01

    ... candidates for promotion or from any other appropriate source. (b) Management is prohibited from bargaining... authority as appropriate. Further, nothing in paragraph (d) of this section establishes an independent right...

  10. Farmers' laws and irrigation : water rights and dispute management in the hills of Nepal

    NARCIS (Netherlands)

    Poudel, R.

    2000-01-01

    The title of my Thesis is "Farmers' Laws and Irrigation: Water Rights and Dispute Management in the Hills of Nepal". This is based on a research I conducted in the Thulotar Kulo irrigation system in Nepal, during 1997 and 1998. Thulotar Kulo is a farmer-managed irrigation

  11. Acute right ventricular dysfunction: real-time management with echocardiography.

    Science.gov (United States)

    Krishnan, Sundar; Schmidt, Gregory A

    2015-03-01

    In critically ill patients, the right ventricle is susceptible to dysfunction due to increased afterload, decreased contractility, or alterations in preload. With the increased use of point-of-care ultrasonography and a decline in the use of pulmonary artery catheters, echocardiography can be the ideal tool for evaluation and to guide hemodynamic and respiratory therapy. We review the epidemiology of right ventricular failure in critically ill patients; echocardiographic parameters for evaluating the right ventricle; and the impact of mechanical ventilation, fluid therapy, and vasoactive infusions on the right ventricle. Finally, we summarize the principles of management in the context of right ventricular dysfunction and provide recommendations for echocardiography-guided management.

  12. Media rights and media security

    Science.gov (United States)

    Baugher, Mark

    2005-03-01

    Digital Rights Management (DRM) systems typically do not treat rights management as a security problem. DRM uses cryptographic techniques but not security relationships. Instead, DRM systems use "tamper-resistant mechanisms" to discourage unauthorized access to rights-managed content. Although proven ineffective in practice, tamper-resistant mechanisms penalize legitimate customers with added complexity and costs that arise from tamper-resisting data or program code. This paper explores how a security relationship between provider and consumer might be more effective for managing rights to content works on two-way networks.

  13. Right of way real property asset management : prototype data architecture.

    Science.gov (United States)

    2009-02-01

    The Texas Department of Transportation (TxDOT) is responsible for managing 1.1 million acres of land that : provide right of way for approximately 80,000 centerline miles of state-maintained roads. Management of : the huge right of way asset involves...

  14. 10 CFR 851.20 - Management responsibilities and worker rights and responsibilities.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Management responsibilities and worker rights and... Program Requirements § 851.20 Management responsibilities and worker rights and responsibilities. (a... workers of their rights and responsibility by appropriate means, including posting the DOE-designated...

  15. Role of methods and technology of management in the sphere of protecting the rights and freedoms of the imprisoned

    Directory of Open Access Journals (Sweden)

    Pavel A. Matyukhov

    2016-01-01

    Full Text Available Objective to form the sciencebased knowledge about the place and the role of technology and methods of management system in solving the problems of the penal system in the sphere of protection of the rights and freedoms of the imprisoned. Methods universal dialectic method of cognition analysis analogy and systemicstructural and abstractlogical methods. Results it was found that the combination of structural elements of the Federal Execution Service of Russia whose activities are in one way or another aimed at enabling prisoners to use their rights and freedoms has a systemic character. It was determined that the efficiency of functioning of any system including the criminalexecutive is provided by managing it its elements. The crucial role of the used methods and technologies is shown. The opinion is formed and justified that their skilled application in the management of the criminalexecutive system will improve the efficiency of solving its tasks including in the sphere of protection of the rights and freedoms of the imprisoned. Scientific novelty the attempt to examine the role of technology and management practices in the functioning of the system ensuring protection of the rights and freedoms of the imprisoned. Practical significance the main provisions and conclusions of the article can be used both in scientific and practical activities of managers of different levels and units of the penal system to address the challenges they face including on the protection of the rights and freedoms of the imprisoned. nbsp

  16. Auctionable fixed transmission rights for congestion management

    Science.gov (United States)

    Alomoush, Muwaffaq Irsheid

    the transaction by the ISO, take a decision to expand the existing system, or retain the original structure of the system. Also, the thesis investigates the impact of wheeling transactions on congestion management, where we present a generalized mathematical model for the Fixed Transmission Right (FTR) auction. The auction guarantees FTR availability to all participants on a non-discriminatory basis, in which system users are permitted to buy, sell and trade FTRs through an auction. When FTRs are utilized with LMPs, they increase the efficient use of the transmission system and let a transmission customer gain advantageous features such as acquiring a mechanism to offset the extra cost due to congestion charges, providing financial and operational certainty and making system users pay for the actual use of the congested paths. The thesis also highlighted FTR trading in secondary markets to self-arrange access across different paths, create long-term transmission rights and provide more commercial certainty.

  17. Right place of human resource management in the reform of health sector.

    Science.gov (United States)

    Hassani, Seyed Abas; Mobaraki, Hossein; Bayat, Maboubeh; Mafimoradi, Shiva

    2013-01-01

    In this paper the real role and place of human resource (HR) in health system reform will be discussed and determined within the whole system through the comprehensive Human Resource Management (HRM) model. Delphi survey and a questionnaire were used to 1) collect HR manager ideas and comments and 2) identify the main challenges of HRM. Then the results were discussed in an expert panel after being analyzed by content analysis method. Also, a deep focus study of recorded documents related to Health Human Resource Management was done. Then based on all achieved results, a rich picture was drawn to illustrate the right place of HRM in health sector. Finally, the authors revitalize the missed function of HRM within the health sector by drawing a holistic conceptual model. The most percentage of frequency about HR belongs to "Lack of reliable HR information system" (91%) and the least percentage of frequency belongs to "Low responsibility of HR" (28%). The most percentage of frequency about HR manager belongs to "Inattention to HR managers as key managers and consider them in background" (80%) and the least percentage of frequency belongs to "Lack of coordination between universities' policies" (30%). According to the conceptual framework, human resources employed in health system are viewed from two comprehensive approaches: instrumental approach and institutional. Unlike the common belief that looks HRM through the supportive approach, it is discussed that HRM not only has an instrumental role, but also do have a driver role.

  18. 48 CFR 970.5227-10 - Patent rights-management and operating contracts, nonprofit organization or small business firm...

    Science.gov (United States)

    2010-10-01

    ... exceptional circumstance subject inventions. (3) Treaties and international agreements. Any rights acquired by..., or public use. The Contractor will file patent applications in additional countries or international... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent rights-management...

  19. The Fundamental Right to a Decent Work as a Resizing Factor of Company Managers Liability

    Directory of Open Access Journals (Sweden)

    Carla Eugenia Caldas Barros

    2016-11-01

    Full Text Available The present paper aims to point out the human labor value, based on the ideia of decent work as a fundamental right, and yet analyzes the impact of this influence on the company managers liability. Initially, based on the theoretical and descriptive method, describing the rise of human dignity as the center of the legal system and its connection to the labor fundamental rights, as a limiting factor on business activity. Finally, through the deductive method, showing how the resizing of the company managers liability is conditioned by the principles and values consolidated in the constitutional economic order.

  20. 36 CFR 64.12 - Standards for grantee financial management systems.

    Science.gov (United States)

    2010-07-01

    ... financial management systems. 64.12 Section 64.12 Parks, Forests, and Public Property NATIONAL PARK SERVICE... RIGHTS-OF-WAY § 64.12 Standards for grantee financial management systems. The grantees' Financial Management Systems shall meet the minimum standards set forth in OMB Circular A-102, Attachment G. ...

  1. Managing RPM-Based Systems with Kickstart and Yum

    CERN Document Server

    McCallum, Ethan

    2007-01-01

    Managing multiple Red Hat-based systems can be easy--with the right tools. The yum package manager and the Kickstart installation utility are full of power and potential for automatic installation, customization, and updates. Here's what you need to know to take control of your systems.

  2. LicenseScript: A Logical Language for Digital Rights Management

    NARCIS (Netherlands)

    Chong, C.N.; Corin, R.J.; Doumen, J.M.; Etalle, Sandro; Hartel, Pieter H.; Law, Y.W.; Tokmakoff, Andrew

    We propose LicenseScript, a language for digital rights management (DRM) based on multiset rewriting and logic programming. LicenseScript enjoys a precise syntax and semantics, and it is rich enough to embed other rights expression languages (REL). We show that LicenseScript is expressive and

  3. Investing in health information management: The right people, in the right place, at the right time.

    Science.gov (United States)

    Ayodeji Makinde, Olusesan; Mami, Mohammed Ibrahim; Oweghoro, Benson Macaulay; Oyediran, Kolawole Azeez; Mullen, Stephanie

    2016-08-01

    To describe the process adopted to review the academic curriculum for training health information management professionals in Nigeria. Health information management professionals are responsible for managing patients' health service records and hospital information systems across health facilities in Nigeria. An assessment found many are inadequately skilled in information and communications technology (ICT) skills believed to be needed for them to play leadership roles in hospital information systems and function effectively. This was traced to a dearth of relevant ICT courses in their academic training curriculum. A review of the curriculum for training health information management professionals was instituted following an agreed need to address these issues. Health records management is evolving across the world including the developing countries. This advancement requires evolution of training programs to meet the increasing application of ICT in this sector. After several sessions, a new curriculum that addresses all the identified educational deficiencies has been developed. It is believed that this step will help improve the quality of training programs. © The Author(s) 2016.

  4. Governance of private forests in Eastern and Central Europe: An analysis of forest harvesting and management rights

    Directory of Open Access Journals (Sweden)

    Laura Bouriaud

    2013-05-01

    Full Text Available A property rights-based approach is proposed in the paper to underlinethe common characteristics of the forest property rights specificationin ten ECE countries, the specific patterns governing the harvesting of timber in private forestry and the role of the forest management planning in determining the content of the property rights. The analysis deals with the private forests of the individuals (non industrial ownership from ten countries, covering 7.3 million ha and producing yearly some 25 million timber. The study shows that the forest management rights in private forests belong to the State and that the withdrawal rights on timber, yet recognized in the forest management plans, are in reality strongly restricted from aneconomic viewpoint. The forest management planning is the key instrument of the current forest governance system, based on top-down, hierarchically imposed and enforced set of compulsory rules on timber harvesting. With few exceptions, the forest owners’ have little influence in the forest planning and harvesting. The rational and State-lead approach of the private forest management has serious implications not only on the economic content of the property rights, but also on the learning and adaptive capacity of private forestry to cope with current challenges such the climate change, the increased industry needs for wood as raw material, or the marketingof innovative non wood forest products and services. The study highlights that understanding and comparing the regime of the forest ownership require a special analysis of the economic rights attached to each forest attribute; and that the evolution towards more participatory decision-making in the local forest governance can not be accurately assessed in ECE region without a proper understanding of the forest management planning process.

  5. Governance of private forests in Eastern and Central Europe: An analysis of forest harvesting and management rights

    Directory of Open Access Journals (Sweden)

    Laura Bouriaud

    2013-07-01

    Full Text Available A property rights-based approach is proposed in the paper to underline the common characteristics of the forest property rights specification in ten ECE countries, the specific patterns governing the harvesting of timber in private forestry and the role of the forest management planning in determining the content of the property rights. The analysis deals with the private forests of the individuals (non industrial ownership from ten countries, covering 7.3 million ha and producing yearly some 25 million m3 timber. The study shows that the forest management rights in private forests belong to the State and that the withdrawal rights on timber, yet recognised in the forest management plans, are in reality strongly restricted from an economic viewpoint. The forest management planning is the key instrument of the current forest governance system, based on top-down, hierarchically imposed and enforced set of compulsory rules on timber harvesting. With few exceptions, the forest owners’ have little influence in the forest planning and harvesting. The rational and State-lead approach of the private forest management has serious implications not only on the economic content of the property rights, but also on the learning and adaptive capacity of private forestry to cope with current challenges such the climate change, the increased industry needs for wood as raw material, or the marketing of innovative non wood forest products and services. The study highlights that understanding and comparing the regime of the forest ownership require a special analysis of the economic rights attached to each forest attribute; and that the evolution towards more participatory decision-making in the local forest governance can not be accurately assessed in ECE region without a proper understanding of the forest management planning process. 

  6. Multinational corporations and infectious disease: Embracing human rights management techniques.

    Science.gov (United States)

    Salcito, Kendyl; Singer, Burton H; Weiss, Mitchell G; Winkler, Mirko S; Krieger, Gary R; Wielga, Mark; Utzinger, Jürg

    2014-01-01

    Global health institutions have called for governments, international organisations and health practitioners to employ a human rights-based approach to infectious diseases. The motivation for a human rights approach is clear: poverty and inequality create conditions for infectious diseases to thrive, and the diseases, in turn, interact with social-ecological systems to promulgate poverty, inequity and indignity. Governments and intergovernmental organisations should be concerned with the control and elimination of these diseases, as widespread infections delay economic growth and contribute to higher healthcare costs and slower processes for realising universal human rights. These social determinants and economic outcomes associated with infectious diseases should interest multinational companies, partly because they have bearing on corporate productivity and, increasingly, because new global norms impose on companies a responsibility to respect human rights, including the right to health. We reviewed historical and recent developments at the interface of infectious diseases, human rights and multinational corporations. Our investigation was supplemented with field-level insights at corporate capital projects that were developed in areas of high endemicity of infectious diseases, which embraced rights-based disease control strategies. Experience and literature provide a longstanding business case and an emerging social responsibility case for corporations to apply a human rights approach to health programmes at global operations. Indeed, in an increasingly globalised and interconnected world, multinational corporations have an interest, and an important role to play, in advancing rights-based control strategies for infectious diseases. There are new opportunities for governments and international health agencies to enlist corporate business actors in disease control and elimination strategies. Guidance offered by the United Nations in 2011 that is widely embraced

  7. [Experts consensus on the management of the right heart function in critically ill patients].

    Science.gov (United States)

    Wang, X T; Liu, D W; Zhang, H M; Long, Y; Guan, X D; Qiu, H B; Yu, K J; Yan, J; Zhao, H; Tang, Y Q; Ding, X; Ma, X C; Du, W; Kang, Y; Tang, B; Ai, Y H; He, H W; Chen, D C; Chen, H; Chai, W Z; Zhou, X; Cui, N; Wang, H; Rui, X; Hu, Z J; Li, J G; Xu, Y; Yang, Y; Ouyan, B; Lin, H Y; Li, Y M; Wan, X Y; Yang, R L; Qin, Y Z; Chao, Y G; Xie, Z Y; Sun, R H; He, Z Y; Wang, D F; Huang, Q Q; Jiang, D P; Cao, X Y; Yu, R G; Wang, X; Chen, X K; Wu, J F; Zhang, L N; Yin, M G; Liu, L X; Li, S W; Chen, Z J; Luo, Z

    2017-12-01

    not be considered as a routine excuse for maintaining higher central venous pressure. (24) When left ventricular dilation, attention should be paid to the effect of left ventricle on right ventricular diastolic function. (25) The impact of left ventricular function should be excluded when the contractility of the right ventricle is decreased. (26) When the right heart load increases acutely, the shunt between the left and right heart should be monitored. (27) Attention should be paid to the increase of central venous pressure caused by right ventricular dysfunction and its influence on microcirculation blood flow. (28) When the vasoactive drugs was used to reduce the pressure of pulmonary circulation, different effects on pulmonary and systemic circulation should be evaluated. (29) Right atrial pressure is an important factor affecting venous return. Attention should be paid to the influence of the pressure composition of the right atrium on the venous return. (30) Attention should be paid to the role of the right ventricle in the acute pulmonary edema. (31) Monitoring the difference between the mean systemic filling pressure and the right atrial pressure is helpful to determine whether the infusion increases the venous return. (32) Venous return resistance is often considered to be a insignificant factor that affects venous return, but attention should be paid to the effect of the specific pathophysiological status, such as intrathoracic hypertension, intra-abdominal hypertension and so on. Consensus can promote right heart function management in critically ill patients, optimize hemodynamic therapy, and even affect prognosis.

  8. Managing Intellectual Property Rights Protection in the System of Comprehensive Seconday Education

    Directory of Open Access Journals (Sweden)

    Vadim Lunyachek

    2018-05-01

    Full Text Available This paper provides the results of the survey conducted among the teachers and principals of comprehensive secondary schools of Kharkiv as to their awareness of how to abide by, draw up and defend intellectual property rights. The paper suggests implementing a system of actions to further the qualifications of educators in this area by introducing relevant special courses, delivering lectures and workshops, or obtaining a second higher education degree.

  9. Knowledge management systems success in healthcare: Leadership matters.

    Science.gov (United States)

    Ali, Nor'ashikin; Tretiakov, Alexei; Whiddett, Dick; Hunter, Inga

    2017-01-01

    To deliver high-quality healthcare doctors need to access, interpret, and share appropriate and localised medical knowledge. Information technology is widely used to facilitate the management of this knowledge in healthcare organisations. The purpose of this study is to develop a knowledge management systems success model for healthcare organisations. A model was formulated by extending an existing generic knowledge management systems success model by including organisational and system factors relevant to healthcare. It was tested by using data obtained from 263 doctors working within two district health boards in New Zealand. Of the system factors, knowledge content quality was found to be particularly important for knowledge management systems success. Of the organisational factors, leadership was the most important, and more important than incentives. Leadership promoted knowledge management systems success primarily by positively affecting knowledge content quality. Leadership also promoted knowledge management use for retrieval, which should lead to the use of that better quality knowledge by the doctors, ultimately resulting in better outcomes for patients. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  10. Use of electronic information systems in nursing management.

    Science.gov (United States)

    Lammintakanen, Johanna; Saranto, Kaija; Kivinen, Tuula

    2010-05-01

    The purpose of this study is to describe nurse managers' perceptions of the use of electronic information systems in their daily work. Several kinds of software are used for administrative and information management purposes in health care organizations, but the issue has been studied less from nurse managers' perspective. The material for this qualitative study was acquired according to the principles of focus group interview. Altogether eight focus groups were held with 48 nurse managers from both primary and specialized health care organizations. The nurse managers were asked in focus groups to describe the use of information systems in their daily work in addition to some other themes. The material was analyzed by inductive content analysis using ATLAS.ti computer program. The main category "pros and cons of using information systems in nursing management" summarized the nurse managers' perceptions of using electronic information systems. The main category consisted of three sub-categories: (1) nurse managers' perceptions of the use of information technology; (2) usability of management information systems; (3) development of personnel competencies and work processes. The nurse managers made several comments on the implementation of immature electronic information systems which caused inefficiencies in working processes. However, they considered electronic information systems to be essential elements of their daily work. Furthermore, the nurse managers' descriptions of the pros and cons of using information systems reflected partly the shortcomings of strategic management and lack of coordination in health care organizations. Copyright 2010 Elsevier Ireland Ltd. All rights reserved.

  11. Bank Customers Management System

    Directory of Open Access Journals (Sweden)

    Ebubeogu Amarachukwu Felix

    2015-08-01

    Full Text Available ABSTRACT The purpose of this project is in partial fulfilment of the requirements of Bachelor of Science Hon in Information Technology. The Design and development of this Bank customers Management system provides a more secured approach in managing bank customers information which strengthens the relationships between banks and their customers by providing the right solutions that uses a multi-level security to improve customer satisfaction. The technology used in developing this project is ASP.NET and the programming language used to develop this project is C and the IDE used is Microsoft Visual Studio 2013 professional in designing the front end while the back end uses Microsoft SQL Server 2012.

  12. Laboratory Information Systems Management and Operations.

    Science.gov (United States)

    Cucoranu, Ioan C

    2015-06-01

    The main mission of a laboratory information system (LIS) is to manage workflow and deliver accurate results for clinical management. Successful selection and implementation of an anatomic pathology LIS is not complete unless it is complemented by specialized information technology support and maintenance. LIS is required to remain continuously operational with minimal or no downtime and the LIS team has to ensure that all operations are compliant with the mandated rules and regulations. Copyright © 2015 Elsevier Inc. All rights reserved.

  13. Quality management system

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Mu Sung

    2009-08-15

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  14. Quality management system

    International Nuclear Information System (INIS)

    Lee, Mu Sung

    2009-08-01

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  15. Enterprise Digital Asset Management System Pilot: Lessons Learned

    Directory of Open Access Journals (Sweden)

    Yong-Mi Kim

    2007-12-01

    Full Text Available Enterprise digital asset management (DAM systems are beginning to be explored in higher education, but little information about their implementation issues is available. This article describes the University of Michigan’s investigation of managing and retrieving rich media assets in an enterprise DAM system. It includes the background of the pilot project and descriptions of its infrastructure and metadata schema. Two case studies are summarized—one in healthcare education, and one in teacher education and research. Experiences with five significant issues are summarized: privacy, intellectual ownership, digital rights management, uncataloged materials backlog, and user interface and integration with other systems.

  16. 48 CFR 970.2703 - Patent rights.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent rights. 970.2703 Section 970.2703 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2703 Patent rights. ...

  17. 100 years of California’s water rights system: patterns, trends and uncertainty

    Science.gov (United States)

    Grantham, Theodore E.; Viers, Joshua H.

    2014-08-01

    For 100 years, California’s State Water Resources Control Board and its predecessors have been responsible for allocating available water supplies to beneficial uses, but inaccurate and incomplete accounting of water rights has made the state ill-equipped to satisfy growing societal demands for water supply reliability and healthy ecosystems. Here, we present the first comprehensive evaluation of appropriative water rights to identify where, and to what extent, water has been dedicated to human uses relative to natural supplies. The results show that water right allocations total 400 billion cubic meters, approximately five times the state’s mean annual runoff. In the state’s major river basins, water rights account for up to 1000% of natural surface water supplies, with the greatest degree of appropriation observed in tributaries to the Sacramento and San Joaquin Rivers and in coastal streams in southern California. Comparisons with water supplies and estimates of actual use indicate substantial uncertainty in how water rights are exercised. In arid regions such as California, over-allocation of surface water coupled with trends of decreasing supply suggest that new water demands will be met by re-allocation from existing uses. Without improvements to the water rights system, growing human and environmental demands portend an intensification of regional water scarcity and social conflict. California’s legal framework for managing its water resources is largely compatible with needed reforms, but additional public investment is required to enhance the capacity of the state’s water management institutions to effectively track and regulate water rights.

  18. 'Allowing the right' and its currency in managing drug stigma in Greece.

    Science.gov (United States)

    Fotopoulou, Maria; Munro, Alison; Taylor, Avril

    2015-08-01

    Evidence suggests that problem drug users are still subject to high levels of stigmatization. In countries, like Greece, where families occupy a central position and honour is collectively attained, secondary drug stigma is also highly prevalent. However, little is known about how drug users and their families manage drug stigma in the specific cultural milieu that makes up Greece. This article presents findings from a qualitative study exploring how drug stigma both manifests itself and is managed by drug users and parents in the context of Greek familial culture. The study was conducted in two state drug agencies in Thessaloniki - Greece and involved the participation of 40 problem drug users (PDU) (23 male/17 female) and 8 parents of PDU. Qualitative, in-depth, interviews were used to collect narrative accounts about experiences of managing addiction, drug stigma and secondary stigma in the Greek parental home. 'Allowing the right' - broadly understood as referring to passing to others information which might devalue a person and consequently that person's family - is discussed in terms of drug stigma management in Greece. We highlight how this culturally specific notion can be viewed as an active strategy adopted by both individual drug users and parents of PDU to manage stigmatization by illustrating the various way in which not 'allowing the right' was described by participants, including drug problem discovery or disclosure and subsequent management of drug using careers and drug stigma within the Greek family context. Given the significance of the cultural notion of 'allowing the right' in the trajectory of drug use amongst PDU and more particularly in stigma management and secondary stigma management, the paper highlights the need for further research into the field in Greece. The need for targeted culturally specific and culturally relevant interventions aimed at reducing drug stigma is also highlighted in relation to both policy and practice. Copyright

  19. Digital Rights Management Sebagai Solusi Keamanan Dokumen Elektronik

    OpenAIRE

    Kurniawan, Agus

    2008-01-01

    Perkembangan dokumen elektronik yang pesat dan mudah diakses berdampak semakin sulitnya dalam membatasi informasi ketika ingin membatasi akses terhadap informasi pada dokumen elektronik. Oleh karena itu, diperlukan mekanisme untuk menjaga informasi pada dokumen elektronik hanya dapat diakses oleh yang berhak dan tersimpan dengan aman. Pendekatan solusi dapat menerapkan Digital Rights Management pada dokumen elektronik sehingga pemilik dokumen elektronik aka lebih aman menyimpannya ataupun mel...

  20. The right to quality education and their decorences for school management

    Directory of Open Access Journals (Sweden)

    Jardelino Menegat

    2018-03-01

    Full Text Available The article is the result of a theoretical research, of documentary nature, which focuses on the right to quality education and its modes of implementation in different contexts. In this text, a contour is made in the indicatives of quality education in the documents disseminated by UNESCO (World Declaration on Education for All: meeting basic learning needs; the Dakar Framework for Action - Education for All: Taking on board our commitments Incheon Declaration and Framework for Action: Towards Inclusive and Equitable Quality Education and Lifelong Education for All and those specific to the Brazilian scenario (National Human Rights Education Plan, National Guideline Education in Human Rights, National Curricular Guidelines for Basic Education and the National Education Plan 2014-2024, analyzing the consequences of these indicatives for school management, the documents were analyzed through the Content Analysis Technique. Among the challenges facing school management for the provision of quality education, the following stand out: Democratic management, the development of a human rights culture; the structuring of safe and healthy learning environments; the existence of a political-pedagogical project based on humanistic values; the articulation between educating and caring; a pedagogical practice based on the principles of freedom, equality, equity and diversity; the development of skills; the promotion of learning; the evaluation of educational quality; academic formation, professional qualification and enhancement of education professionals.

  1. Property Rights for Natural Resources Management in Indonesia: Have They Been Ruled Unconstitutional?

    Directory of Open Access Journals (Sweden)

    Sarah Waddell

    2012-05-01

    Full Text Available A new property right known as the coastal waters commercial use right (Hak Pengusahaan Pengairan Pesisir (HP-3 introduced by Law No. 27 of 2007 regarding the Management of Coastal and Small Island Areas has been ruled inoperative by the Constitutional Court. The decision raises a question as to whether the door has been closed to marketbased instruments that rely on property rights as a policy tool in natural resources management. This concern is relevant as legal developments in natural resources law internationally have moved away from traditional forms of regulation to focus on the creation of new statutory property rights such as fisheries rights, water use rights and rights associated with carbon sequestration. An exploration of theConstitutional Court’s decisionsuggests that a similar line of reasoning would not, and should not,arise in relation to other forms of property rights that the Government of Indonesia may seek to introduce in the future.

  2. Fit for purpose quality management system for military forensic exploitation.

    Science.gov (United States)

    Wilson, Lauren Elizabeth; Gahan, Michelle Elizabeth; Robertson, James; Lennard, Chris

    2018-03-01

    In a previous publication we described a systems approach to forensic science applied in the military domain. The forensic science 'system of systems' describes forensic science as a sub-system in the larger criminal justice, law enforcement, intelligence, and military systems, with quality management being an important supporting system. Quality management systems help to ensure that organisations achieve their objective and continually improve their capability. Components of forensic science quality management systems can include standardisation of processes, accreditation of facilities to national/international standards, and certification of personnel. A fit for purpose quality management system should be balanced to allow organisations to meet objectives, provide continuous improvement; mitigate risk; and impart a positive quality culture. Considerable attention over the last decades has been given to the need for forensic science quality management systems to meet criminal justice and law enforcement objectives. More recently, the need for the forensic quality management systems to meet forensic intelligence objectives has been considered. This paper, for the first time, discusses the need for a fit for purpose quality management system for military forensic exploitation. Crown Copyright © 2018. Published by Elsevier B.V. All rights reserved.

  3. Evaluation of Water Rights to Reveal Hidden Patterns and Trends in Water Resources Management

    Science.gov (United States)

    Grantham, T.; Viers, J. H.

    2013-12-01

    California's current water management challenges are strongly influenced by the legacy of 19th century legal doctrines, which aim to maximize the appropriation of available water for human uses and benefits. As a consequence and over time, most of the water flowing through the state's rivers and streams has been dedicated through water rights to human uses, limiting potential for sustainable water management and climate change adaptation. This history is recorded in a database of water rights, which contains approximately 50,000 records of diversion and storage projects dating from the early 19th century to the present day. Although water rights records are rarely considered in regional water budgeting, information on the location, age, purpose, and face values of water rights offer insight into the spatial and temporal dimensions of water-use pressures and can be used to identify opportunities for management interventions. Using the state water rights database, we calculated cumulative face-value rights at the HUC12-watershed scale and compared water appropriation volumes with modeled predictions of surface water availability. Total annual allocations of current water rights exceed 340 million-acre feet (4 x 1011 m3), approximately five times the state's mean annual runoff. The total volume of face-value water rights is 25 to 1,000% of annual water availability in major river basins (greater than 400 km2), with the greatest degree of appropriation observed in tributaries to the Sacramento and San Joaquin Rivers and coastal streams in southern California. Trends in water rights appropriation since 1900 indicate periods of rapid demand growth between 1925-1940, 1950-1960, and 1975-1985, which mirror major dam building eras. We illustrate how information on the spatial distribution of water rights, appropriation volumes, and priority of use, can guide strategic planning for re-allocating water for environmental benefits and other management objectives. We also

  4. System and methods of resource usage using an interoperable management framework

    Science.gov (United States)

    Heileman, Gregory L.; Jamkhedkar, Pramod A.; Lamb, Christopher C.

    2017-10-31

    Generic rights expression language allowing interoperability across different computing environments including resource usage of different applications. A formal framework for usage management provides scaffolding upon which interoperable usage management systems can be built. Certain features of the framework are standardized, such as the operational semantics, including areas free of standards that necessitate choice and innovation to achieve a balance of flexibility and usability for interoperability in usage management systems.

  5. Assessing the role of informal sector in WEEE management systems: A System Dynamics approach.

    Science.gov (United States)

    Ardi, Romadhani; Leisten, Rainer

    2016-11-01

    Generally being ignored by academia and regulators, the informal sector plays important roles in Waste Electrical and Electronic Equipment (WEEE) management systems, especially in developing countries. This study aims: (1) to capture and model the variety of informal operations in WEEE management systems, (2) to capture the dynamics existing within the informal sector, and (3) to assess the role of the informal sector as the key player in the WEEE management systems, influencing both its future operations and its counterpart, the formal sector. By using System Dynamics as the methodology and India as the reference system, this study is able to explain the reasons behind, on the one hand, the superiority of the informal sector in WEEE management systems and, on the other hand, the failure of the formal systems. Additionally, this study reveals the important role of the second-hand market as the determinant of the rise and fall of the informal sector in the future. Copyright © 2015 Elsevier Ltd. All rights reserved.

  6. A Web-Based Information System for Field Data Management

    Science.gov (United States)

    Weng, Y. H.; Sun, F. S.

    2014-12-01

    A web-based field data management system has been designed and developed to allow field geologists to store, organize, manage, and share field data online. System requirements were analyzed and clearly defined first regarding what data are to be stored, who the potential users are, and what system functions are needed in order to deliver the right data in the right way to the right user. A 3-tiered architecture was adopted to create this secure, scalable system that consists of a web browser at the front end while a database at the back end and a functional logic server in the middle. Specifically, HTML, CSS, and JavaScript were used to implement the user interface in the front-end tier, the Apache web server runs PHP scripts, and MySQL to server is used for the back-end database. The system accepts various types of field information, including image, audio, video, numeric, and text. It allows users to select data and populate them on either Google Earth or Google Maps for the examination of the spatial relations. It also makes the sharing of field data easy by converting them into XML format that is both human-readable and machine-readable, and thus ready for reuse.

  7. Mastering the management system.

    Science.gov (United States)

    Kaplan, Robert S; Norton, David P

    2008-01-01

    Companies have always found it hard to balance pressing operational concerns with long-term strategic priorities. The tension is critical: World-class processes won't lead to success without the right strategic direction, and the best strategy in the world will get nowhere without strong operations to execute it. In this article, Kaplan, of Harvard Business School, and Norton, founder and director of the Palladium Group, explain how to effectively manage both strategy and operations by linking them tightly in a closed-loop management system. The system comprises five stages, beginning with strategy development, which springs from a company's mission, vision, and value statements, and from an analysis of its strengths, weaknesses, and competitive environment. In the next stage, managers translate the strategy into objectives and initiatives with strategy maps, which organize objectives by themes, and balanced scorecards, which link objectives to performance metrics. Stage three involves creating an operational plan to accomplish the objectives and initiatives; it includes targeting process improvements and preparing sales, resource, and capacity plans and dynamic budgets. Managers then put plans into action, monitoring their effectiveness in stage four. They review operational, environmental, and competitive data; assess progress; and identify barriers to execution. In the final stage, they test the strategy, analyzing cost, profitability, and correlations between strategy and performance. If their underlying assumptions appear faulty, they update the strategy, beginning another loop. The authors present not only a comprehensive blueprint for successful strategy execution but also a managerial tool kit, illustrated with examples from HSBC Rail, Cigna Property and Casualty, and Store 24. The kit incorporates leading management experts' frameworks, outlining where they fit into the management cycle.

  8. Environmental Management System

    Science.gov (United States)

    Goals Recycling Green Purchasing Pollution Prevention Reusing Water Resources Environmental Management Stewardship » Environmental Protection » Environmental Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the

  9. An electronic regulatory document management system for a clinical trial network.

    Science.gov (United States)

    Zhao, Wenle; Durkalski, Valerie; Pauls, Keith; Dillon, Catherine; Kim, Jaemyung; Kolk, Deneil; Silbergleit, Robert; Stevenson, Valerie; Palesch, Yuko

    2010-01-01

    A computerized regulatory document management system has been developed as a module in a comprehensive Clinical Trial Management System (CTMS) designed for an NIH-funded clinical trial network in order to more efficiently manage and track regulatory compliance. Within the network, several institutions and investigators are involved in multiple trials, and each trial has regulatory document requirements. Some of these documents are trial specific while others apply across multiple trials. The latter causes a possible redundancy in document collection and management. To address these and other related challenges, a central regulatory document management system was designed. This manuscript shares the design of the system as well as examples of it use in current studies. Copyright (c) 2009 Elsevier Inc. All rights reserved.

  10. The Resource Manager the ATLAS Trigger and Data Acquisition System

    CERN Document Server

    Aleksandrov, Igor; The ATLAS collaboration; Lehmann Miotto, Giovanna; Soloviev, Igor

    2016-01-01

    The Resource Manager of the ATLAS Trigger and Data Acquisition system The Resource Manager is one of the core components of the Data Acquisition system of the ATLAS experiment at the LHC. The Resource Manager marshals the right for applications to access resources which may exist in multiple but limited copies, in order to avoid conflicts due to program faults or operator errors. The access to resources is managed in a manner similar to what a lock manager would do in other software systems. All the available resources and their association to software processes are described in the Data Acquisition configuration database. The Resource Manager is queried about the availability of resources every time an application needs to be started. The Resource Manager’s design is based on a client-server model, hence it consists of two components: the Resource Manager "server" application and the "client" shared library. The Resource Manager server implements all the needed functionalities, while the Resource Manager c...

  11. Managing adaptively for multifunctionality in agricultural systems.

    Science.gov (United States)

    Hodbod, Jennifer; Barreteau, Olivier; Allen, Craig; Magda, Danièle

    2016-12-01

    The critical importance of agricultural systems for food security and as a dominant global landcover requires management that considers the full dimensions of system functions at appropriate scales, i.e. multifunctionality. We propose that adaptive management is the most suitable management approach for such goals, given its ability to reduce uncertainty over time and support multiple objectives within a system, for multiple actors. As such, adaptive management may be the most appropriate method for sustainably intensifying production whilst increasing the quantity and quality of ecosystem services. However, the current assessment of performance of agricultural systems doesn't reward ecosystem service provision. Therefore, we present an overview of the ecosystem functions agricultural systems should and could provide, coupled with a revised definition for assessing the performance of agricultural systems from a multifunctional perspective that, when all satisfied, would create adaptive agricultural systems that can increase production whilst ensuring food security and the quantity and quality of ecosystem services. The outcome of this high level of performance is the capacity to respond to multiple shocks without collapse, equity and triple bottom line sustainability. Through the assessment of case studies, we find that alternatives to industrialized agricultural systems incorporate more functional goals, but that there are mixed findings as to whether these goals translate into positive measurable outcomes. We suggest that an adaptive management perspective would support the implementation of a systematic analysis of the social, ecological and economic trade-offs occurring within such systems, particularly between ecosystem services and functions, in order to provide suitable and comparable assessments. We also identify indicators to monitor performance at multiple scales in agricultural systems which can be used within an adaptive management framework to increase

  12. Water Information Management & Analysis System (WIMAS) v 4.0

    Data.gov (United States)

    Kansas Data Access and Support Center — The Water Information Management and Analysis System (WIMAS) is an ArcView based GIS application that allows users to query Kansas water right data maintained by the...

  13. Using Electronic Systems for Document Management in Economic Entities

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Document workflow and management, be them scanned documents, computer-generated e-documents or complex file formats, are critical elements for the success of an organization. Delivering the correct information to the right person, at the right moment is a fundamental element of daily activity. In the Internet era, documents have a new format; and what is more important: completely new functions. Paper is replaced by electronic formats such as .html, .xms, .pdf or .doc. The price for this progress is the increasing technological complexity, and with this complexity comes the need for more efficient techniques of management and organization such as a document management electronic system. This paper aims to present document management not as a separate software category on the IT market, but as an element integrated with any software solution, maximizing its capacity of making business more efficient.

  14. Crisis planning to manage risks posed by animal rights extremists.

    Science.gov (United States)

    Bailey, Matthew R; Rich, Barbara A; Bennett, B Taylor

    2010-01-01

    Among the multitude of crises that US research institutions may face are those caused by animal rights activists. While most activists opposed to animal research use peaceful and lawful means of expressing their opinions, some extremists resort to illegal methods. Arson, break-ins, and theft with significant property damage at US animal research facilities began in the 1980s. The most troubling trend to develop in the past decade is the targeting of individuals associated with animal research, whether directly or indirectly, and the use of violent scare tactics to intimidate researchers and their families. The National Association for Biomedical Research has a 30-year history of monitoring the animal rights movement and assisting member institutions with crisis situations. In this article we discuss attacks on researchers at their homes, cyber crimes, exploitation of new media formats, infiltration of research facilities, and the targeting of external research stakeholders and business partners. We describe the need for a well-conceived crisis management plan and strong leadership to mitigate crisis situations. Institutions with well-informed leaders and crisis management teams ready to take timely action are best equipped to protect staff, laboratory animals, and research programs. They act on early warnings, provide support for targeted staff, seek legal remedies, thoughtfully control access to research facilities, and identify and enlist new research supporters. We underscore the importance of up-to-date crisis planning so that institutions are not only aware of ongoing risks posed by animal rights extremists but also better prepared to take preemptive action and able to manage those risks successfully.

  15. Managing a chest tube and drainage system.

    Science.gov (United States)

    Durai, Rajaraman; Hoque, Happy; Davies, Tony W

    2010-02-01

    Intercostal drainage tubes (ie, chest tubes) are inserted to drain the pleural cavity of air, blood, pus, or lymph. The water-seal container connected to the chest tube allows one-way movement of air and liquid from the pleural cavity. The container should not be changed unless it is full, and the chest tube should not be clamped unnecessarily. After a chest tube is inserted, a nurse trained in chest-tube management is responsible for managing the chest tube and drainage system. This entails monitoring the chest-tube position, controlling fluid evacuation, identifying when to change or empty the containers, and caring for the tube and drainage system during patient transport. This article provides an overview of indications, insertion techniques, and management of chest tubes. Copyright 2010 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  16. INFORMATION-ANALYTICAL SYSTEM OF EDUCATIONAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Y. Tryus

    2011-05-01

    Full Text Available The conceptual approaches to create the information-analytical system of educational management, which used modern methods of decision-making and simulation, web-technology are considered. The main criteria for selection of system development are: openness, free of charge, easy of use and independence of system software and hardware. The technology and the system itself meets the requirements as: focus on national and international standards in higher education, compliance with service-oriented architecture, ensure stable operation for a large number of users, support a clear division of users rights to obtain and change information resources, modularity of final product and its ability to integrate into the university corporate information system.

  17. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  18. Bridge Management Systems

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper bridge management systems are discussed with special emphasis on management systems for reinforced concrete bridges. Management systems for prestressed concrete bridges, steel bridges, or composite bridges can be developed in a similar way....

  19. Information management of the geoinformation systems

    Directory of Open Access Journals (Sweden)

    Trifković Milan

    2010-01-01

    Full Text Available Importance of information management procedures and practice based on of defined and accepted frame within an organization, is discussed. It is a common presumption that transformation of data into information brings the level of knowledge to support right decision making. However, these efforts and investments often do not result in increased efficiency, due to absence of well defined and designed transactional and informational systems. As a consequence, many organizations are 'rich' in data, but still 'poor' in information. Difference between transactional (or operational and informational systems are highlighted, too.

  20. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  1. SME's Implementing a Quality Management System- Risks and Opportunities

    Directory of Open Access Journals (Sweden)

    Luise ZEININGER

    2017-12-01

    Full Text Available Part of our daily lives, risk ceased to be just something that managers are desperate to alleviate if not eliminate. It is now rightfully considered a path to explore new opportunities. The last version of the ISO 9001, the 2015 edition, is asking from organization implementing it to determine the risk and opportunities associated with their main processes, the impact over relevant third parties and the context, both internal and external. With this duality as starting point, we have investigated among SME's implementing a quality management system what would they consider to be the risk and opportunities associated to this action. Our paper presents hereinafter the partial results of a wider study on Romanian SME's management, especially the findings related to what managers consider as risk or opportunity when implementing a quality management system.

  2. Small supermarket management system

    Institute of Scientific and Technical Information of China (English)

    曹正

    2016-01-01

    This system USES the Java language in the MyEclipse platform development tool, SQL2005 as the database platform for data and data, the SQL2005 required for the user operating system. It mainly implements the daily management of goods, including purchase management, inventory management, sales management, personnel management and supplier management. The system can also complete the functions of browsing, querying, adding, deleting and modifying relevant information. This topic is the core of the stock management, inventory management and sales management, at the same time, the system also has the full user management and permissions management function..

  3. INFORMATION-ANALYTICAL LEARNING MANAGEMENT SYSTEM UNIVERSITIES

    Directory of Open Access Journals (Sweden)

    Yu. Tryus

    2016-12-01

    Full Text Available We consider conceptual approaches to creation of information systems, learning management school, which uses modern methods of decision-making and simulational modeling, web-technologies. The main criteria for the selection of development tools of the system are: openness, free of charge, easy to use and independence from system software and hardware. The chosen technology and the system itself satisfies such requirements as: focus on national and international standards in the field of higher education, adherence to service-oriented architecture, ensuring stable operation with a large number of users, support for a clear division of user rights to obtain and change information resources, software modularity the final product and its ability to integrate into the corporate information system of the university

  4. 50 CFR 35.12 - Water rights.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Water rights. 35.12 Section 35.12 Wildlife... NATIONAL WILDLIFE REFUGE SYSTEM WILDERNESS PRESERVATION AND MANAGEMENT General Rules § 35.12 Water rights... the Department of the Interior as to exemption from State water laws. ...

  5. A Designed Framework for Delivering Systems Thinking Skills to Small Business Managers

    Directory of Open Access Journals (Sweden)

    Daowei Sun

    2014-06-01

    Full Text Available Many small businesses suffer from inadequate management skills which can lead to poor business performance and unsustainable businesses. Research to date has focused on traditional skills such as communication, time management and people skills, yet critically many business managers have no systems thinking skills. This paper presents a framework targeted at delivering systems thinking skills to managers of small businesses utilizing some key characteristic of small business managers. The design is also based on a systems analysis and guided by both adult learning theory and teaching theory. The quality of a training framework depends on the quality of the content design and the right training delivery methods. The systems thinking skills training framework structured systems thinking knowledge into three modules in order to meet the needs of different levels of managers. The framework advocates blended training delivery methods and it also presents possible pitfalls based on training experiences. Additionally, the framework incorporates a continuous improvement process for ongoing systemic improvement.

  6. Competency development information system - Knowledge management based competency development management tool

    International Nuclear Information System (INIS)

    Aminuddin, R.; Zainuddin, Z.; Taib, Z.; Hamid, A.H.Ab.; Hamdan, S.N.

    2007-01-01

    Full text: Knowledge identification, acquisition, sharing, preservation and measurement are some of the desired habits and processes necessary for knowledge management to be effective and contributes to increased innovation, organizational value, competitiveness and sustainability. The knowledge workers in the K-economic era are expected to be an innovative knowledge professional who are capable of managing their own work as well as their own competency development. Organizations however need to provide an environment, tools and policies to support and encourage learning and knowledge acquisition in all forms, methods and approaches beyond what is traditionally done. For an ordinary knowledge professional, he is only interested in developing the necessary competency to complete his assigned tasks and progress in his career. He would not be interested to learn and be lectured on knowledge management or learning principles and concepts. But for the organization it is not only important that its staff members understand and able to go through the process of acquiring the necessary skills to carry out their current and future tasks at the right time, but it has to ensure that what they learn or their individual knowledge is converted into organizational knowledge, utilised, shared and preserved. Hence it is important that tools are provided and policies are set in place to ensure that staff identify, acquire, utilise, share and preserve knowledge necessary for organizational sustainability and growth. A Competency Development Information System was recently developed to address the issue of inculcating the habit of identifying, acquiring, utilising, sharing, preserving and measuring knowledge among staff members hands-on by doing and repeating without having to learn the theory first. Besides that it helps organization manage competency development processes from analysis to planning, implementing and right through to evaluation. The process starts from capturing

  7. New Management Tools – From Video Management Systems to Business Decision Systems

    Directory of Open Access Journals (Sweden)

    Emilian Cristian IRIMESCU

    2015-06-01

    Full Text Available In the last decades management was characterized by the increased use of Business Decision Systems, also called Decision Support Systems. More than that, systems that were until now used in a traditional way, for some simple activities (like security, migrated to the decision area of management. Some examples are the Video Management Systems from the physical security activity. This article will underline the way Video Management Systems passed to Business Decision Systems, which are the advantages of use thereof and which are the trends in this industry. The article will also analyze if at this moment Video Management Systems are real Business Decision Systems or if there are some functions missing to rank them at this level.

  8. The Resource Manager the ATLAS Trigger and Data Acquisition System

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00210579; The ATLAS collaboration; Avolio, Giuseppe; Lehmann Miotto, Giovanna; Soloviev, Igor

    2017-01-01

    The Resource Manager is one of the core components of the Data Acquisition system of the ATLAS experiment at the LHC. The Resource Manager marshals the right for applications to access resources which may exist in multiple but limited copies, in order to avoid conflicts due to program faults or operator errors. The access to resources is managed in a manner similar to what a lock manager would do in other software systems. All the available resources and their association to software processes are described in the Data Acquisition configuration database. The Resource Manager is queried about the availability of resources every time an application needs to be started. The Resource Manager’s design is based on a client-server model, hence it consists of two components: the Resource Manager “server” application and the “client” shared library. The Resource Manager server implements all the needed functionalities, while the Resource Manager client library provides remote access to the “server” (i.e....

  9. The right place. Solid waste management in the Republic of Maldives: between infrastructural measures and local practices

    Directory of Open Access Journals (Sweden)

    Malatesta Stefano

    2015-06-01

    Full Text Available The 2010 UNPD’s Assessment of Development Results defined the Maldives “a vulnerable Small Island Developing State” by pointing out the influence of both external and local human factors on their fragile ecosystems. This impact is deeply related to a main geographical feature: the high dispersion of land mass and population, both of them spread over a distance of 860 km. Above all, this dispersion has an effect on two environmental issues: energy distribution and solid waste management. The latter is particularly interesting for the geographical analysis of Small Island Countries. Due to centre-periphery distance and cost benefits analysis, in the Maldives public and private actors have developed different solid waste management models: central and regional waste management dumpsites, hybrid systems implemented by resorts and “informal” practices still followed by local communities. In this paper, we discuss these systems stressing on the relevance of combining infrastructural measures with “informal” practices at local level. Furthermore, we report the outcomes of The Right Place, a participatory waste management action carried out by MaRHE Center (a Milano- Bicocca Research Center in Faafu Magoodhoo Island.

  10. Role-based Rights in Artificial Social Systems

    NARCIS (Netherlands)

    G. Boella (Guido); L.W.N. van der Torre (Leon)

    2005-01-01

    htmlabstract In this paper we use normative systems to introduce roles and rights in the game-theoretic artificial social systems developed by Shoham and Tennenholtz. We model normative systems as socially constructed agents whose behavior is determined by a set of role playing agents. Roles are

  11. Operations management system

    Science.gov (United States)

    Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.

    1990-01-01

    The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

  12. Right Whale Sightings Advisory System (RWSAS)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Right Whale Sighting Advisory System (RWSAS) is a NOAA Fisheries program which was designed to reduce collisions between ships and the critically endangered...

  13. Choosing the Right Systems Integration

    Directory of Open Access Journals (Sweden)

    Péči Matúš

    2014-12-01

    Full Text Available The paper examines systems integration and its main levels at higher levels of control. At present, the systems integration is one of the main aspects participating in the consolidation processes and financial flows of a company. Systems Integration is a complicated emotionconsuming process and it is often a problem to choose the right approach and level of integration. The research focused on four levels of integration, while each of them is characterized by specific conditions. At each level, there is a summary of recommendations and practical experience. The paper also discusses systems integration between the information and MES levels. The main part includes user-level integration where we describe an example of such integration. Finally, we list recommendations and also possible predictions of the systems integration as one of the important factors in the future.

  14. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  15. THE ROLE OF THE VILLAGE IN FOREST MANAGEMENT: HUMAN RIGHTS PERSPECTIVES

    Directory of Open Access Journals (Sweden)

    Mohamad Rif'an

    2016-06-01

    Full Text Available 1945 opening noble nation Indonesia is an agreement to live together (modus vivendi in bonding the plural nation. The Modus Vivendi, has given birth to the state's objective, which is the nation's identity and guidelines in their stride. Thus, the constitution has mandated the State to be responsible for the welfare of the people. Indonesia has the second largest tropical forest in the world with high economic value that can be managed by the state and society. This allows for the utilization of various types of plants and economic aspects of the utilization of forest products. In preparation result is a pity forests is not optimal either with intensive and with many requests deforestation or forest land conversion. Deforestation well planned and unplanned forest. On the other hand, Indonesia which acknowledges the existence of the village government and the empowerment of the rural community empowerment which is a process for making the community to improve the quality of life for the better is weak then the need for the existence of the role of government in the village of Village forest management as one of the rights of the villagers. The type of research is normative juridical. Hence this paper initiated a grand design Village forest management to complete the processing and utilization of forest products that are integrated with the role of the village government as a system intended to pengoptimalam supply chain production as one of the important indicators of development and resilience of economies in each region using variable results income forests as principal.

  16. Problems of assessment of efficiency of managing corporate rights in joint stock companies

    Directory of Open Access Journals (Sweden)

    Kurinnyy Oleksandr V.

    2013-03-01

    Full Text Available The goal of the article lies in identification of specific features of formation, implementation and practical use of the balanced scorecard of efficiency of managing corporate rights in domestic joint stock companies. Complexity of formation of the balanced scorecard of efficiency of managing property of shareholders is due to a necessity of ensuring deliberateness of the combination of financial and non-financial indicators for formalisation of managerial goals, establishment of a connection between financial parameters and operation indicators of enterprise activity and also attempt to determine the whole cost of an enterprise, which would be adequate to the market value of its assets. Taking into account the above, the article defines efficiency of managing shares of the joint stock as the degree of correlation between the goal, regulatory set functions, managerial actions and results of execution of managerial duties by managers. Prospect of further studies in this direction is development of methodical basis of formation and functioning of the balanced scorecard of efficiency of the use of shares of corporate rights in a joint stock company.

  17. Decision-making process related to treatment and management in Korean women with breast cancer: Finding the right individualized healthcare trajectory.

    Science.gov (United States)

    Kim, Kkotbong; Yang, Jinhyang

    2017-06-01

    After being diagnosed with breast cancer, women must make a number of decisions about their treatment and management. When the decision-making process among breast cancer patients is ineffective, it results in harm to their health. Little is known about the decision-making process of breast cancer patients during the entire course of treatment and management. We investigated women with breast cancer to explore the decision-making processes related to treatment and management. Eleven women participated, all of whom were receiving treatment or management in Korea. The average participant age was 43.5years. For data collection and analysis, a grounded theory methodology was used. Through constant comparative analyses, a core category emerged that we referred to as "finding the right individualized healthcare trajectory." The decision-making process occurred in four phases: turmoil, exploration, balance, and control. The turmoil phase included weighing the credibility of information and lowering the anxiety level. The exploration phase included assessing the expertise/promptness of medical treatment and evaluating the effectiveness of follow-up management. The balance phase included performing analyses from multiple angles and rediscovering value as a human being. The control phase included constructing an individualized management system and following prescribed and other management options. It is important to provide patients with accurate information related to the treatment and management of breast cancer so that they can make effective decisions. Healthcare providers should engage with patients on issues related to their disease, understand the burden placed on patients because of issues related to their sex, and ensure that the patient has a sufficient support system. The results of this study can be used to develop phase-specific, patient-centered, and tailored interventions for breast cancer patients. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. An Integrated Web-based Decision Support System in Disaster Risk Management

    Science.gov (United States)

    Aye, Z. C.; Jaboyedoff, M.; Derron, M. H.

    2012-04-01

    Nowadays, web based decision support systems (DSS) play an essential role in disaster risk management because of their supporting abilities which help the decision makers to improve their performances and make better decisions without needing to solve complex problems while reducing human resources and time. Since the decision making process is one of the main factors which highly influence the damages and losses of society, it is extremely important to make right decisions at right time by combining available risk information with advanced web technology of Geographic Information System (GIS) and Decision Support System (DSS). This paper presents an integrated web-based decision support system (DSS) of how to use risk information in risk management efficiently and effectively while highlighting the importance of a decision support system in the field of risk reduction. Beyond the conventional systems, it provides the users to define their own strategies starting from risk identification to the risk reduction, which leads to an integrated approach in risk management. In addition, it also considers the complexity of changing environment from different perspectives and sectors with diverse stakeholders' involvement in the development process. The aim of this platform is to contribute a part towards the natural hazards and geosciences society by developing an open-source web platform where the users can analyze risk profiles and make decisions by performing cost benefit analysis, Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) with the support of others tools and resources provided. There are different access rights to the system depending on the user profiles and their responsibilities. The system is still under development and the current version provides maps viewing, basic GIS functionality, assessment of important infrastructures (e.g. bridge, hospital, etc.) affected by landslides and visualization of the impact

  19. Monitoring overloaded vehicles: Improving traffic control centre performance by using management information systems

    CSIR Research Space (South Africa)

    Muronga, K

    2016-07-01

    Full Text Available Decision making is an important function of management and to facilitate decision making that is relevant to any organisation, it is imperative that managers have the correct information at the right time. Since the 1990’s, the Transport Systems...

  20. Construct on Digital Rights Management for Historical Newspaper Archives

    Directory of Open Access Journals (Sweden)

    Shien-chiang Yu

    2004-06-01

    Full Text Available Newspaper is one of the most important media as it contains the records that input the cultural data and social events, progress of national and international economical and political developments, the world’s circumstances of the time, so as transmitting information and sharing knowledge of particular regions or around the globe. However, the copyright is limited to cover the transformed entity to digital contents. In order to protect the rights of digitized-contents and restrict the scope of on-line grant of historical newspaper, it is necessary to clarify the concepts and practices. This study reveals the concepts of digital rights management via literature review that will work on both mentioned issues, so as to identify the fair use to assure the profit of digitized archive of historical newspaper. [Article content in Chinese

  1. Improving nuclear plant management effectiveness: Aligning strategy, systems, and people

    International Nuclear Information System (INIS)

    Price, K.F.

    1991-01-01

    The effectiveness of any organization requires alignment of the appropriate financial, physical, and human resources. The manager's role is to efficiently utilize the right combination of these resources to achieve organizational objectives. In-depth studies of the nuclear programs of three major investor-owned utilities using a culture assessment process called the communication, values, and rewards (CVR) assessment have shown significant misalignments in those organizations' strategies, systems and people management. The CVR assessment related employees' perceptions of what drives their company's culture with the stated company strategic direction and management philosophies. Specifically, CVR provides a comparison of employee-held work-related values with those desired by management. Data obtained by a CVR assessment can be used to understand organizational misalignment and make changes to bring systems into alignment with corporate strategy and culture

  2. Anatomy of an anesthesia information management system.

    Science.gov (United States)

    Shah, Nirav J; Tremper, Kevin K; Kheterpal, Sachin

    2011-09-01

    Anesthesia information management systems (AIMS) have become more prevalent as more sophisticated hardware and software have increased usability and reliability. National mandates and incentives have driven adoption as well. AIMS can be developed in one of several software models (Web based, client/server, or incorporated into a medical device). Irrespective of the development model, the best AIMS have a feature set that allows for comprehensive management of workflow for an anesthesiologist. Key features include preoperative, intraoperative, and postoperative documentation; quality assurance; billing; compliance and operational reporting; patient and operating room tracking; and integration with hospital electronic medical records. Copyright © 2011 Elsevier Inc. All rights reserved.

  3. There is more to IT portfolio management than top-management making the right decisions: A review of the literature

    DEFF Research Database (Denmark)

    Hansen, Lars; Kræmmergaard, Pernille

    2011-01-01

    There is more to IT portfolio management than top-management making the right decisions: A review of the IT PPM literature. Organizations experience ongoing challenges in managing their portfolio of InformationTechnology (IT) as IT expenses are becoming a major part of the budget. Hence......, organizations implement a wide range of IT portfolio management (IT PPM) arrangements to increase value from IT. The literature vastly emphasizes the organizational benefits of establishing IT PPM, but only a minor part of the literature emphasizes the unintended and negative consequences of IT PPM....

  4. [How management teams use information and control systems to manage hospitals].

    Science.gov (United States)

    Naranjo-Gil, David

    2016-01-01

    To analyze the relationship between the characteristics of top management teams and the different use of management information and control systems (MICS) to implement policies that encourage cooperation and activity coordination in public hospitals. Data were collected through a questionnaire sent to each member of the top management teams of 231 Spanish public hospitals (chief executive director, medical director, nursing director and director for financial and social issues). A total of 457 valid questionnaires were returned, composing 86 full top management teams (37.23%). Top management team diversity was positively related to the interactive use of MICS. Management teams composed of younger members and members with longer service used MICS interactively. Top management teams with a predominantly clinical education and experience used MICS interactively, while top teams with a predominantly administrative education and experience used MICS diagnostically. The results also showed that cooperation and coordination in hospitals were positively related to the interactive use of MICS and were negatively related to the diagnostic use of MICS. The interactive use of MICS is an important mediator in the relationship between top team diversity and policies focused on hospital decentralization. Top management teams with diverse characteristics (e.g. age, length of service, education and experience) use management information interactively to enhance activity coordination and resource allocation in hospitals. Copyright © 2016 SESPAS. Published by Elsevier Espana. All rights reserved.

  5. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  6. Route planning module as a part of Supply Chain Management system

    Directory of Open Access Journals (Sweden)

    Michal Košíček

    2012-01-01

    Full Text Available Today, the demand for creating a systematic approach for managing sales, ordering, and logistics has increased. Supply Chain Management (SCM is one of the responses to problems that have arose with the need for managing complex supply chains. Nowadays, most of the activities of Supply Chain Management is realized or supported with computing technologies. Route planning is an important part of Supply Chain Management related to both procurement and distribution. Route planning systems specify the sequences in which the selected transport vehicles should supply the demand points by requested quantities of goods at the right time. The paper is focused on the analysis of a route planning system which could be used as a part of Supply Chain Management information system or as a standalone application. It describes basic techniques and frameworks of transportation problems as well as important functional requirements, considering recent trends in the field of distribution planning. As a result, functional specification of basic features and other components of system are provided. The paper is a result of a joint initiative of the authors and a vendor of business information systems.

  7. Mental models of a water management system in a green building.

    Science.gov (United States)

    Kalantzis, Anastasia; Thatcher, Andrew; Sheridan, Craig

    2016-11-01

    This intergroup case study compared users' mental models with an expert design model of a water management system in a green building. The system incorporates a constructed wetland component and a rainwater collection pond that together recycle water for re-use in the building and its surroundings. The sample consisted of five building occupants and the cleaner (6 users) and two experts who were involved with the design of the water management system. Users' mental model descriptions and the experts' design model were derived from in-depth interviews combined with self-constructed (and verified) diagrams. Findings from the study suggest that there is considerable variability in the user mental models that could impact the efficient functioning of the water management system. Recommendations for improvements are discussed. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. Learning Content Management Systems

    Directory of Open Access Journals (Sweden)

    Tache JURUBESCU

    2008-01-01

    Full Text Available The paper explains the evolution of e-Learning and related concepts and tools and its connection with other concepts such as Knowledge Management, Human Resources Management, Enterprise Resource Planning, and Information Technology. The paper also distinguished Learning Content Management Systems from Learning Management Systems and Content Management Systems used for general web-based content. The newest Learning Content Management System, very expensive and yet very little implemented is one of the best tools that helps us to cope with the realities of the 21st Century in what learning concerns. The debates over how beneficial one or another system is for an organization, can be driven by costs involved, efficiency envisaged, and availability of the product on the market.

  9. Lighting system with thermal management system

    Science.gov (United States)

    Arik, Mehmet; Weaver, Stanton; Stecher, Thomas; Seeley, Charles; Kuenzler, Glenn; Wolfe, Jr., Charles; Utturkar, Yogen; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2013-05-07

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  10. Electric vehicle energy management system

    Science.gov (United States)

    Alaoui, Chakib

    This thesis investigates and analyzes novel strategies for the optimum energy management of electric vehicles (EVs). These are aimed to maximize the useful life of the EV batteries and make the EV more practical in order to increase its acceptability to market. The first strategy concerns the right choice of the batteries for the EV according to the user's driving habits, which may vary. Tests conducted at the University of Massachusetts Lowell battery lab show that the batteries perform differently from one manufacturer to the other. The second strategy was to investigate the fast chargeability of different batteries, which leads to reduce the time needed to recharge the EV battery pack. Tests were conducted again to prove that only few battery types could be fast charged. Test data were used to design a fast battery charger that could be installed in an EV charging station. The third strategy was the design, fabrication and application of an Electric Vehicle Diagnostic and Rejuvenation System (EVDRS). This system is based on Mosfet Controlled Thyristors (MCTs). It is capable of quickly identifying any failing battery(s) within the EV pack and rejuvenating the whole battery pack without dismantling them and unloading them. A novel algorithm to rejuvenate Electric Vehicle Sealed Lead Acid Batteries is described. This rejuvenation extends the useful life of the batteries and makes the EV more competitive. The fourth strategy was to design a thermal management system for EV, which is crucial to the safe operation, and the achievement of normal/optimal performance of, electric vehicle (EV) batteries. A novel approach for EV thermal management, based on Pettier-Effect heat pumps, was designed, fabricated and tested in EV. It shows the application of this type of technology for thermal management of EVs.

  11. Managing hybrid marketing systems.

    Science.gov (United States)

    Moriarty, R T; Moran, U

    1990-01-01

    As competition increases and costs become critical, companies that once went to market only one way are adding new channels and using new methods - creating hybrid marketing systems. These hybrid marketing systems hold the promise of greater coverage and reduced costs. But they are also hard to manage; they inevitably raise questions of conflict and control: conflict because marketing units compete for customers; control because new indirect channels are less subject to management authority. Hard as they are to manage, however, hybrid marketing systems promise to become the dominant design, replacing the "purebred" channel strategy in all kinds of businesses. The trick to managing the hybrid is to analyze tasks and channels within and across a marketing system. A map - the hybrid grid - can help managers make sense of their hybrid system. What the chart reveals is that channels are not the basic building blocks of a marketing system; marketing tasks are. The hybrid grid forces managers to consider various combinations of channels and tasks that will optimize both cost and coverage. Managing conflict is also an important element of a successful hybrid system. Managers should first acknowledge the inevitability of conflict. Then they should move to bound it by creating guidelines that spell out which customers to serve through which methods. Finally, a marketing and sales productivity (MSP) system, consisting of a central marketing database, can act as the central nervous system of a hybrid marketing system, helping managers create customized channels and service for specific customer segments.

  12. Strategic plan to optimize the management of right-of-way parcel and utility information at FDOT.

    Science.gov (United States)

    2013-05-01

    The Florida Department of Transportation (FDOT) manages a huge right-of-way asset. Examples of core : processes related to this asset include determining right-of-way boundaries; inventorying roadside features; : preparing right-of-way maps; acquirin...

  13. 48 CFR 49.402-1 - The Government's right.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false The Government's right. 49... MANAGEMENT TERMINATION OF CONTRACTS Termination for Default 49.402-1 The Government's right. Under contracts containing the Default clause at 52.249-8, the Government has the right, subject to the notice requirements...

  14. Digital rights management for digital cinema

    Science.gov (United States)

    Kirovski, Darko; Peinado, Marcus; Petitcolas, Fabien A. P.

    2001-12-01

    There is a wide consensus among the feature film production studios that the Internet era brings a new paradigm for film distribution to cinemas worldwide. The benefits of digital cinema to both producers and cinemas are numerous: significantly lower distribution and maintenance costs, immediate access to film libraries, higher presentation quality, and strong potential for developing new business models. Despite these advantages, the studios are still reluctant to jump into the digital age. The main showstopper for digital cinema is the danger of widespread piracy. Piracy already costs Hollywood an estimated two billion dollars annually and digital cinema without proper copyright enforcement could increase this number. In this paper, we present a copyright management system that aims at providing the set of necessary security tools: standard cryptographic primitives and copyright protection mechanisms that enable a reliable and secure feature film delivery system.

  15. EDUCATION AND EDUCATIONAL SYSTEM MANAGEMENT: STATUS, TRENDS, PROBLEMS AND PROSPECTS

    Directory of Open Access Journals (Sweden)

    V. P. Panasyuk

    2017-01-01

    Full Text Available Introduction. The current stage of development of education in Russia, characterized by the continuation of reforms and intense innovation processes, require essential changes in management. It takes not only a revision of the paradigmatic foundations of such management, but also the adoption of complex measures for improving its efficiency, and reducing excessive centralization.The aim of the present publication is to study the status and prospects of education management in the Russian Federation.Methodology and research methods. The author used the methodology of an interdisciplinary and system-based approaches to the analysis of the considered phenomenon; methods of theoretical analysis, synthesis and generalization.Results. Negative tendencies and contradictions in modern management of education and educational systems, including problems of differentiation of the rights, competences and powers of bodies of various levels of management are revealed. The condition of education management is considered in the context of common problems of its modernization and key innovative vectors of development of the society. Detailed analysis of paradigmatic foundations of management is carried out; its systemacity and balance are presented from the positions of management members and a specific variety of the functions realized by them. System-genetic foundations of management, its recurrence, compliance with the principles of system inheritance are analysed; effectiveness, equifinality, management efficiency in its social, economic, pedagogical and organizational measurements are studied.Scientific novelty concludes in the reasons identification of a gap between the proper and existing management of an educational system. The perspective directions of improvement of this field are singled out.Practical significance. The author provides the recommendations on the use of the proposed ideas concerning the revision of the current approaches to the

  16. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  17. Litigating the right to health: what can we learn from a comparative law and health care systems approach.

    Science.gov (United States)

    Flood, Colleen; Gross, Aeyal

    2014-12-11

    This article presents research demonstrating that the right to health plays different roles in different types of health systems. In high-income countries with tax-funded health systems, we usually encounter a lack of an enforceable right to heath. In contrast, rights play a more significant role in social health insurance/managed competition systems (which are present in a mixture of high-income and middle-income countries). There is concern, for example in Colombia, that a high volume of rights litigation can challenge the very sustainability of a public health care system and distort resources away from those most in need. Finally, in middle-income countries with big gaps between a poor public health system and a rich private one, we are more likely to find an express constitutional right to health care (or one is inferred from, for example, the right to life). In some of these countries, constitutional rights were included as part of the transition to democracy and an attempt to address huge inequities within society. Here the scale of health inequities suggests that courts need to be bolder in their interpretation of health care rights. We conclude that in adjudicating health rights, courts should scrutinize decision-making through the lens of health equity and equality to better achieve the inherent values of health human rights. Copyright © 2014 Gross and Flood. This is an open access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/by-nc/3.0/), which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original author and source are credited.

  18. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  19. New type radiation management system

    International Nuclear Information System (INIS)

    Mogi, Kenichi; Uranaka, Yasuo; Fujita, Kazuhiko

    2001-01-01

    The radiation management system is a system to carry out entrance and leaving room management of peoples into radiation management area, information management on radiation obtained from a radiation testing apparatus, and so on. New type radiation management system developed by the Mitsubishi Electric Corp. is designed by concepts of superior maintenance and system practice by using apparatus and its interface with standard specification, upgrading of processing response by separating exposure management processing from radiation monitoring processing on a computer, and a backup system not so as to lose its function by a single accident of the constructed computer. Therefore, the system is applied by the newest hardware, package software, and general use LAN, and can carry out a total system filled with requirements and functions for various radiation management of customers by preparing a basic system from radiation testing apparatus to entrance and leaving room management system. Here were described on outline of the new type management system, concept of the system, and functions of every testing apparatus. (G.K.)

  20. THE PLACE OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM IN THE INTEGRATED MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Piotr Kafel

    2016-06-01

    Full Text Available The purpose of this paper is to analyze the place of occupational health and safety management system (OHSMS within the integrated management system. Implementation aspects of management systems are discussed, namely the different management system standards used for registration, for example ISO 14001, ISO 9001, OHSAS 18001, ISO 27001, the order in which they were implemented, the time required for each implementation, as well as the scope of integration of these management system standards into a single Integrated Management System and the level of integration. In order to do so, some of the results of a survey carried out in 81 organizations registered to at least two management systems selected from popular international standards, e.g.: ISO 9001, ISO 14001, OHSAS 18001, ISO/IEC 27001, ISO 22000 were used. OHSMS is not the system that is implemented as a first one. Usually it is implemented after or simultaneously with ISO 9001 and ISO 14001 standards. Time of implementation of MSSs in second and further round of implementation is shorter than during the implementation of first standards. There is a higher level of integration of implemented management standards in organizations where one of the standards in OHSMS, than in a companies without OHSMS. The paper analyses those sequences of management systems implementation of safety management systems with other system, that allow organizations to achieve higher levels of integration and presents a possible pattern for the companies initiating the integration process.

  1. BlogForever D3.3: Development of the Digital Rights Management Policy

    OpenAIRE

    Farrell, Tracie; Kim, Yunhyong; Pinsent, Ed; Kopidaki, Stella; Rynning, Morten; Manolopoulos, Ioanis; Papadopoulou, Olympia; Arampatzis, Stratos; Trochidis, Ilias; Zioga, Despoina

    2013-01-01

    This report presents a set of recommended practices and approaches that a future BlogForever repository can use to develop a digital rights management policy. The report outlines core legal aspects of digital rights that might need consideration in developing policies, and what the challenges are, in particular, in relation to web archives and blog archives. These issues are discussed in the context of the digital information life cycle and steps that might be taken within the workflow of the...

  2. Autonomic Cluster Management System (ACMS): A Demonstration of Autonomic Principles at Work

    Science.gov (United States)

    Baldassari, James D.; Kopec, Christopher L.; Leshay, Eric S.; Truszkowski, Walt; Finkel, David

    2005-01-01

    Cluster computing, whereby a large number of simple processors or nodes are combined together to apparently function as a single powerful computer, has emerged as a research area in its own right. The approach offers a relatively inexpensive means of achieving significant computational capabilities for high-performance computing applications, while simultaneously affording the ability to. increase that capability simply by adding more (inexpensive) processors. However, the task of manually managing and con.guring a cluster quickly becomes impossible as the cluster grows in size. Autonomic computing is a relatively new approach to managing complex systems that can potentially solve many of the problems inherent in cluster management. We describe the development of a prototype Automatic Cluster Management System (ACMS) that exploits autonomic properties in automating cluster management.

  3. A systems engineering management approach to resource management applications

    Science.gov (United States)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  4. Scale development of safety management system evaluation for the airline industry.

    Science.gov (United States)

    Chen, Ching-Fu; Chen, Shu-Chuan

    2012-07-01

    The airline industry relies on the implementation of Safety Management System (SMS) to integrate safety policies and augment safety performance at both organizational and individual levels. Although there are various degrees of SMS implementation in practice, a comprehensive scale measuring the essential dimensions of SMS is still lacking. This paper thus aims to develop an SMS measurement scale from the perspective of aviation experts and airline managers to evaluate the performance of company's safety management system, by adopting Schwab's (1980) three-stage scale development procedure. The results reveal a five-factor structure consisting of 23 items. The five factors include documentation and commands, safety promotion and training, executive management commitment, emergency preparedness and response plan and safety management policy. The implications of this SMS evaluation scale for practitioners and future research are discussed. Copyright © 2012 Elsevier Ltd. All rights reserved.

  5. Europe's Shifting Response to HIV/AIDS: From Human Rights to Risk Management.

    Science.gov (United States)

    Smith, Julia

    2016-12-01

    Despite a history of championing HIV/AIDS as a human rights issue, and a rhetorical commitment to health as a human right, European states and institutions have shifted from a rights-based response to a risk management approach to HIV/AIDS since the economic recession of 2008. An interdisciplinary perspective is applied to analyze health policy changes at the national, regional, and global levels by drawing on data from key informant interviews, and institutional and civil society documents. It is demonstrated that, in the context of austerity measures, member states such as the UK and Greece reduced commitments to rights associated with HIV/AIDS; at the regional level, the EU failed to develop rights-based approaches to address the vulnerabilities and health care needs of key populations affected by HIV/AIDS, particularly migrants and sex workers; and at the global level, the EU backtracked on commitments to global health and is prioritizing the intellectual property rights of pharmaceutical companies over the human rights of people living with HIV/AIDS. The focus within and from the EU is on containment, efficiency, and cost reduction. The rights of those most affected are no longer prioritized.

  6. Get It Right First Time: A Beginner's Guide to Document Management.

    Science.gov (United States)

    Hayes, Mike

    1997-01-01

    Document management (DM) systems capture, store, index, retrieve, route, distribute, and archive information in organizations. Discusses "passive" electronic libraries and "active" systems; characteristics of effective systems; implementing a system; fitting a new system to an existing infrastructure; budgets; system…

  7. Incorporating co-management within your environmental management system

    International Nuclear Information System (INIS)

    Melton, D.A.; Maher, S.

    1998-01-01

    The meaning of co-management in the renewable resource sector in terms of government and First Nations relations was explained. Co-management is a short term for co-operative management and has a formative history in the Northwest Territories, particularly in wildlife management. For example, co-management bridged the gap between the aboriginal way of hunting with those of the government. The aboriginal system was associated by self regulation based on traditional knowledge whereas the government system emphasized science, laws and regulations. At present, there are few examples of co-management in the oil and gas sector. This paper described the lessons that could be learned from previous examples of co-management and how those lessons might apply to an Environmental Management System (EMS) for the private oil and gas sector. 3 refs

  8. Informal Justice Systems: Charting a Course for Human Rights-Based Engagement

    DEFF Research Database (Denmark)

    Kerrigan, Fergus; McKay, Anne Louise; Kristiansen, Annali

    engagement with informal justice systems can build greater respect and protection for human rights. It highlights the considerations that development partners should have when assessing whether to implement programmes involving informal justice systems, the primary consideration being that engagement......Providing accessible justice is a state obligation under international human rights standards, but this obligation does not require that all justice be provided through formal justice systems. If done in ways to respect and uphold human rights, the provision of justice through informal justice...... systems is not against human rights standards and can be a mechanism to enhance the fulfilment of human rights obligations by delivering accessible justice to individuals and communities where the formal justice system does not have the capacity or geographical reach. This study seeks to identify how...

  9. Integrated management systems and workflow-based electronic document management: An empirical study

    Directory of Open Access Journals (Sweden)

    Hang Thu Pho

    2014-01-01

    Full Text Available Purpose: Many global organizations have aligned their strategy and operation via the ISO-based framework of integrated management system (IMS that allows them to merge quality, environment, health and safety management systems. In such context, having a robust electronic document management system (EDMS is essential, especially at global enterprises where a large amount of documents generated by processes flows through different work cultures. However, there is no "one-size-fits-all" design for EDMS because it depends on organizations' needs, size and resource allocation. This article discusses the interrelation between EDMS and IMS in order to suggest a best practice. Design/methodology/approach: This article methodologically based upon a qualitative, interpretivistic, longitudinal empirical study in a wind turbine factory. Findings and Originality/value: IMS improvement and effectiveness has been overlooking EDMS as a key factor in establishing appropriate technological support of the IMS processes. Rightful application of EDMS can further contribute to organizational learning, precision of documentation and cross-organisational collaboration. Research limitations/implications: Theorising on IMS needs a stronger perspective of the technological limitations and potentials of basing IMS on EDMS. Practical implications: IMS are complex systems involving a large number of administrative functions. EDMS provides a formal representation with automation potentials both heightening and securing document trustworthiness. Social implications: IMS has a tendency to stay with professionals, e.g. line managers and QA/QC/QMS professionals. The EDMS line of discussion suggests a broader inclusion. Originality/value: Researching IMS as a technological implementation is giving a better platform of aligning the IMS with other business processes and is bringing IMS closer to the operational activities within the enterprise.

  10. Diagnosis and management of right colonic diverticular disease: A review.

    Science.gov (United States)

    Ferrara, Francesco; Bollo, Jesús; Vanni, Letizia V; Targarona, Eduardo M

    2016-12-01

    The aim of this narrative review is to define the clinical-pathological characteristics and to clarify the management of right colonic diverticular disease. It is rare in Europe, USA and Australia and more common in Asia. In the recent years its incidence has increased in the West, with various distributions among populations. Many studies have reported that it is difficult to differentiate the presenting symptoms of this disease from those of appendicitis before surgery, because the signs and symptoms are similar, so misdiagnosis is not infrequent. With accurate imaging studies it is possible to reach a precise preoperative diagnosis, in order to assess an accurate treatment strategy. Currently the management of this disease is not well defined, no clear guidelines have been proposed and it is not known whether the guidelines for left colonic diverticular disease can also be applied for it. Several authors have stated that conservative management is the best approach, even in case of recurrence, and surgery should be indicated in selected cases. Copyright © 2016. Publicado por Elsevier España, S.L.U.

  11. Integration of QR codes into an anesthesia information management system for resident case log management.

    Science.gov (United States)

    Avidan, Alexander; Weissman, Charles; Levin, Phillip D

    2015-04-01

    Quick response (QR) codes containing anesthesia syllabus data were introduced into an anesthesia information management system. The code was generated automatically at the conclusion of each case and available for resident case logging using a smartphone or tablet. The goal of this study was to evaluate the use and usability/user-friendliness of such system. Resident case logging practices were assessed prior to introducing the QR codes. QR code use and satisfactions amongst residents was reassessed at three and six months. Before QR code introduction only 12/23 (52.2%) residents maintained a case log. Most of the remaining residents (9/23, 39.1%) expected to receive a case list from the anesthesia information management system database at the end of their residency. At three months and six months 17/26 (65.4%) and 15/25 (60.0%) residents, respectively, were using the QR codes. Satisfaction was rated as very good or good. QR codes for residents' case logging with smartphones or tablets were successfully introduced in an anesthesia information management system and used by most residents. QR codes can be successfully implemented into medical practice to support data transfer. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  12. Data management and data enrichment for systems biology projects.

    Science.gov (United States)

    Wittig, Ulrike; Rey, Maja; Weidemann, Andreas; Müller, Wolfgang

    2017-11-10

    Collecting, curating, interlinking, and sharing high quality data are central to de.NBI-SysBio, the systems biology data management service center within the de.NBI network (German Network for Bioinformatics Infrastructure). The work of the center is guided by the FAIR principles for scientific data management and stewardship. FAIR stands for the four foundational principles Findability, Accessibility, Interoperability, and Reusability which were established to enhance the ability of machines to automatically find, access, exchange and use data. Within this overview paper we describe three tools (SABIO-RK, Excemplify, SEEK) that exemplify the contribution of de.NBI-SysBio services to FAIR data, models, and experimental methods storage and exchange. The interconnectivity of the tools and the data workflow within systems biology projects will be explained. For many years we are the German partner in the FAIRDOM initiative (http://fair-dom.org) to establish a European data and model management service facility for systems biology. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  13. Management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Crump, K.

    1978-01-01

    An Australian university architect studying management information systems programs at academic institutions in the United States visited 26 universities and colleges and nine educational and professional associations, including extended visits at the University of Wisconsin and the National Center of Higher Education Management Systems. During these visits, he investigated university and college space utilization programs, gained operational and developmental experience at institutions with education philosophies similar to those in Australia, and examined trends in low cost student housing. This report of his observations focusses on management information systems projects throughout the academic community, resource accountability, energy conservation, facilities planning for the handicapped, student housing, and interdisciplinary approaches to education.

  14. Development of Quality Management Systems: How Have Disruptive Technological Innovations in Quality Management Affected Organizations?

    Directory of Open Access Journals (Sweden)

    Pasi Hellman

    2013-07-01

    Full Text Available This research investigates the history of quality and development of quality management systems. History of quality is investigated from Hammurabi’s law all the way to today’s reigning quality initiatives including ISO, Six Sigma and Lean manufacturing. In the last chapters the current state of quality management is being examined. The foresight method is also opened up and examined. The Innovator’s dilemma concept, originally presented by Clayton Christensen, is used to analyse how quality management systems have been evolved in the last 100 years. Special emphasis is placed on the US manufacturing in the 1970s and 1980s. Based on the literature, the concept of Innovator’s dilemma and the fall of US manufacturing are merged. The result is a prime example that the Innovator’s Dilemma is a universal phenomenon. The industry leader is trying to maintain its position and do everything right but still it is destined to fail. The causes and effects are being discussed in later chapters.

  15. Managing Conflict in Temporary Management Systems

    Science.gov (United States)

    Wilemon, David L.

    1973-01-01

    As organizational tasks have grown more complex, several innovative temporary management systems such as matrix management have been developed. The Apollo space program has been an important contribution to the development of matrix management techniques. Discusses the role of conflict within the matrix, its determinants, and the process of…

  16. Endoscopic Management of Perforation of Right Hepatic Duct Following Non-Surgical Abdominal Trauma

    OpenAIRE

    Sharma, B. C.; Maini, A.; Saraswat, V. A.

    1997-01-01

    Isolated bile duct injuries after blunt abdominal trauma are rare. Surgery is the usual mode of treatment. We report a patient with a right hepatic duct injury following blunt abdominal trauma who was managed successfully by endoscopic papillotomy.

  17. Management systems in production operations

    International Nuclear Information System (INIS)

    Walters, K.B.; Henderson, G.

    1993-01-01

    The Cullen Enquiry into the Piper Alpha disaster in the U.K. North Sea recommended that an operator should formally present it's company Management System and demonstrate how safety is achieved throughout the life cycle of a platform, from design through operation to abandonment. Brunei Shell Petroleum has prepared a corporate level Safety Management System. As part of Safety Case work, the corporate system is being extended to include the development of specific Management Systems with particular emphasis on offshore production operations involving integrated oil and gas facilities. This paper will describe the development of Management Systems, which includes an intensive Business Process Analysis and will comment upon it's applicability and relationship to ISO 9000. The paper will further describe the applicability and benefits of Management Systems and offer guidance on required effort. The paper will conclude that development of structured Management Systems for safety critical business processes is worthwhile but prioritization of effort will be necessary. As such the full adoption of Management Systems will be directional in nature

  18. Management Information Systems Research.

    Science.gov (United States)

    Research on management information systems is illusive in many respects. Part of the basic research problem in MIS stems from the absence of standard...decision making. But the transition from these results to the realization of ’satisfactory’ management information systems remains difficult indeed. The...paper discusses several aspects of research on management information systems and reviews a selection of efforts that appear significant for future progress. (Author)

  19. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  20. A Model-Driven Development Method for Management Information Systems

    Science.gov (United States)

    Mizuno, Tomoki; Matsumoto, Keinosuke; Mori, Naoki

    Traditionally, a Management Information System (MIS) has been developed without using formal methods. By the informal methods, the MIS is developed on its lifecycle without having any models. It causes many problems such as lack of the reliability of system design specifications. In order to overcome these problems, a model theory approach was proposed. The approach is based on an idea that a system can be modeled by automata and set theory. However, it is very difficult to generate automata of the system to be developed right from the start. On the other hand, there is a model-driven development method that can flexibly correspond to changes of business logics or implementing technologies. In the model-driven development, a system is modeled using a modeling language such as UML. This paper proposes a new development method for management information systems applying the model-driven development method to a component of the model theory approach. The experiment has shown that a reduced amount of efforts is more than 30% of all the efforts.

  1. Development of Information Management System for Plant Life Cycle Management

    International Nuclear Information System (INIS)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong

    2015-01-01

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system

  2. Development of Information Management System for Plant Life Cycle Management

    Energy Technology Data Exchange (ETDEWEB)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong [KOREA HYDRO and NUCLEAR POWER CO. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system.

  3. An inexact reverse logistics model for municipal solid waste management systems.

    Science.gov (United States)

    Zhang, Yi Mei; Huang, Guo He; He, Li

    2011-03-01

    This paper proposed an inexact reverse logistics model for municipal solid waste management systems (IRWM). Waste managers, suppliers, industries and distributors were involved in strategic planning and operational execution through reverse logistics management. All the parameters were assumed to be intervals to quantify the uncertainties in the optimization process and solutions in IRWM. To solve this model, a piecewise interval programming was developed to deal with Min-Min functions in both objectives and constraints. The application of the model was illustrated through a classical municipal solid waste management case. With different cost parameters for landfill and the WTE, two scenarios were analyzed. The IRWM could reflect the dynamic and uncertain characteristics of MSW management systems, and could facilitate the generation of desired management plans. The model could be further advanced through incorporating methods of stochastic or fuzzy parameters into its framework. Design of multi-waste, multi-echelon, multi-uncertainty reverse logistics model for waste management network would also be preferred. Copyright © 2010 Elsevier Ltd. All rights reserved.

  4. ROW (Right-of-Way) interfering construction activities management program

    Energy Technology Data Exchange (ETDEWEB)

    Rosito, Roberta; Oliveira, Marisa; Lima, Shirley [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    A significant portion of pipeline failures occurs due to external damage. This includes third party right of way (ROW) encroachment, which shall be identified and avoided. However, injuries caused by known and planned activities do happen. Construction of crossing or sharing ROW pipelines, crossing roads and bridges, neighboring buildings and excavations of any kind might put existing pipelines in risk. This paper presents how the TRANSPETRO ROW Interfering Construction Activities Management Program is implemented by a regional ROW maintenance department responsible for more than 3,000 km of pipelines, mostly in Rio de Janeiro and Minas Gerais states. This program is based on a TRANSPETRO procedure that was written after the publication of the Official Order number 125 of ANP (Oil, Gas and Biofuel Brazilian National Agency). Tasks from design review and approval to field construction supervision are performed by the staff responsible for the routine patrols and maintenance management. The ability of foreseeing risky activities is improved by expertise gained from day-to-day work on site. (author)

  5. Strategic management of health care information systems: nurse managers' perceptions.

    Science.gov (United States)

    Lammintakanen, Johanna; Kivinen, Tuula; Saranto, Kaija; Kinnunen, Juha

    2009-01-01

    The aim of this study is to describe nurse managers' perceptions of the strategic management of information systems in health care. Lack of strategic thinking is a typical feature in health care and this may also concern information systems. The data for this study was collected by eight focus group interviews including altogether 48 nurse managers from primary and specialised health care. Five main categories described the strategic management of information systems in health care; IT as an emphasis of strategy; lack of strategic management of information systems; the importance of management; problems in privacy protection; and costs of IT. Although IT was emphasised in the strategies of many health care organisations, a typical feature was a lack of strategic management of information systems. This was seen both as an underutilisation of IT opportunities in health care organisations and as increased workload from nurse managers' perspective. Furthermore, the nurse managers reported that implementation of IT strengthened their managerial roles but also required stronger management. In conclusion, strategic management of information systems needs to be strengthened in health care and nurse managers should be more involved in this process.

  6. Comparative Pedagogical Studies on Models of Education Systems Management in the EU and Ukraine

    Science.gov (United States)

    Desiatov, Tymofii

    2017-01-01

    The article highlights the peculiarities of models of education systems management in the EU and Ukraine. It has been proved that effectiveness of the education process is determined by managerial culture, which characterizes a manager's professional image. Special attention has been paid to finding the right balance between centralization and…

  7. Medical-Information-Management System

    Science.gov (United States)

    Alterescu, Sidney; Friedman, Carl A.; Frankowski, James W.

    1989-01-01

    Medical Information Management System (MIMS) computer program interactive, general-purpose software system for storage and retrieval of information. Offers immediate assistance where manipulation of large data bases required. User quickly and efficiently extracts, displays, and analyzes data. Used in management of medical data and handling all aspects of data related to care of patients. Other applications include management of data on occupational safety in public and private sectors, handling judicial information, systemizing purchasing and procurement systems, and analyses of cost structures of organizations. Written in Microsoft FORTRAN 77.

  8. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  9. Management Information System (MIS: Tool for Monitoring the Waste Management Health Service (RSS and Cost of Treatment

    Directory of Open Access Journals (Sweden)

    Vania Elisabete Schneider

    2013-06-01

    Full Text Available One of the major challenges of solid waste management has been improve and deploy systems that perform monitoring and control of management processes of health service’s waste (HSW. This study aims to evaluate the total cost per category of HSW/day and active bed/day with the handling of HSW in a teaching hospital in northeastern area of Brazil`s Rio Grande do Sul state and identify contributions of a management information system (MIS in the management process, especially considering the generation and segregation of waste. Utilized methodology was developed in two stages: data collection about the management of the HSW and proposition, implementation and feed of a MIS for recording and processing of data related to waste characterization. Results show that whether the management system of the hospital in this study were 100% right, the monthly savings for the treatment of infectious waste would be 18.4% of the costs and 5.83% of costs of chemical waste. The implementation of MIS becomes an essential tool in the evaluation of the management process of HSW since it makes possible to raise issues of fundamental importance to the implementation and evaluation of strategies contained in the HSW management plan. The MIS also represents a tool of easy reference and of great importance to evaluate generation of HSW as it helps to promote the surveillance, identification of sectors that have the biggest problems with segregation, as well as ways to minimize costs and impacts.

  10. Valuing flexibilities in the design of urban water management systems.

    Science.gov (United States)

    Deng, Yinghan; Cardin, Michel-Alexandre; Babovic, Vladan; Santhanakrishnan, Deepak; Schmitter, Petra; Meshgi, Ali

    2013-12-15

    Climate change and rapid urbanization requires decision-makers to develop a long-term forward assessment on sustainable urban water management projects. This is further complicated by the difficulties of assessing sustainable designs and various design scenarios from an economic standpoint. A conventional valuation approach for urban water management projects, like Discounted Cash Flow (DCF) analysis, fails to incorporate uncertainties, such as amount of rainfall, unit cost of water, and other uncertainties associated with future changes in technological domains. Such approach also fails to include the value of flexibility, which enables managers to adapt and reconfigure systems over time as uncertainty unfolds. This work describes an integrated framework to value investments in urban water management systems under uncertainty. It also extends the conventional DCF analysis through explicit considerations of flexibility in systems design and management. The approach incorporates flexibility as intelligent decision-making mechanisms that enable systems to avoid future downside risks and increase opportunities for upside gains over a range of possible futures. A water catchment area in Singapore was chosen to assess the value of a flexible extension of standard drainage canals and a flexible deployment of a novel water catchment technology based on green roofs and porous pavements. Results show that integrating uncertainty and flexibility explicitly into the decision-making process can reduce initial capital expenditure, improve value for investment, and enable decision-makers to learn more about system requirements during the lifetime of the project. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Business advertisements management system

    OpenAIRE

    Rekel, Ernest

    2017-01-01

    Business Advertisements Management System The main goal of the project was to create a business advertisements management system, where users could easily create and find business advertisements. To accomplish this goal exist- ing systems were analyzed as well as their limitations. The end result is a working system which is able to store and proccess huge amount of data.

  12. Pembangunan Model Restaurant Management System

    OpenAIRE

    Fredy Jingga; Natalia Limantara

    2014-01-01

    Model design for Restaurant Management System aims to help in restaurant business process, where Restaurant Management System (RMS) help the waitress and chef could interact each other without paper limitation.  This Restaurant Management System Model develop using Agile Methodology and developed based on PHP Programming Langguage. The database management system is using MySQL. This web-based application model will enable the waitress and the chef to interact in realtime, from the time they a...

  13. Empirical Analysis on Transfer and Limitation of Land Contractual Management Right

    Institute of Scientific and Technical Information of China (English)

    Xiuqing; ZOU

    2013-01-01

    Existing laws have three limitations on transfer of land contractual management right. The survey of 506 farmer households in Zhejiang,Jiangxi and Guangxi provinces indicates that most farmers have the consistent knowledge of limitation on " transfer being approved by the party giving out the contract in advance" with legislative requirements,but it is not effectively implemented in actual operation. As to limitation on transferee,no matter in cognition of farmers,or in real transfer process,the transferee is not totally limited to farmers engaged in agricultural production and management. For the constraint that the transferor should have stable non-agricultural occupation or stable income source, most farmers agree,but more than half of the farmers have not confirmed the transfer action in practice.

  14. Senior Management Use of Management Control Systems in Large Companies

    DEFF Research Database (Denmark)

    Willert, Jeanette; Israelsen, Poul; Rohde, Carsten

    2017-01-01

    Ferreira and Otley’s (2009) conceptual and holistic framework for performance management systems, supplemented by elements of contextual factors and organisational culture. Further, selected researchers’ perceptions of the purpose of using management control systems are related to practitioners’ ideas......The use of management control systems in large companies remains relatively unexplored. Indeed, only a few studies of senior managers’ use of management control systems consider multiple controls in companies. This paper explores data from a comprehensive survey of the use of management control...... systems in 120 strategic business units at some of the largest companies in Denmark. The paper identifies how senior management guides and controls their subordinates to meet their companies’ objectives. The presentation and discussion of the results, including citations from executive managers, use...

  15. Materials management information systems.

    Science.gov (United States)

    1996-01-01

    The hospital materials management function--ensuring that goods and services get from a source to an end user--encompasses many areas of the hospital and can significantly affect hospital costs. Performing this function in a manner that will keep costs down and ensure adequate cash flow requires effective management of a large amount of information from a variety of sources. To effectively coordinate such information, most hospitals have implemented some form of materials management information system (MMIS). These systems can be used to automate or facilitate functions such as purchasing, accounting, inventory management, and patient supply charges. In this study, we evaluated seven MMISs from seven vendors, focusing on the functional capabilities of each system and the quality of the service and support provided by the vendor. This Evaluation is intended to (1) assist hospitals purchasing an MMIS by educating materials managers about the capabilities, benefits, and limitations of MMISs and (2) educate clinical engineers and information system managers about the scope of materials management within a healthcare facility. Because software products cannot be evaluated in the same manner as most devices typically included in Health Devices Evaluations, our standard Evaluation protocol was not applicable for this technology. Instead, we based our ratings on our observations (e.g., during site visits), interviews we conducted with current users of each system, and information provided by the vendor (e.g., in response to a request for information [RFI]). We divided the Evaluation into the following sections: Section 1. Responsibilities and Information Requirements of Materials Management: Provides an overview of typical materials management functions and describes the capabilities, benefits, and limitations of MMISs. Also includes the supplementary article, "Inventory Cost and Reimbursement Issues" and the glossary, "Materials Management Terminology." Section 2. The

  16. The Stress Management in the Enterprise Management System

    Directory of Open Access Journals (Sweden)

    Kuzmin Oleh Ye.

    2017-05-01

    Full Text Available The article systematizes the classification of the type of management by a number of attributes: horizon of ambition, priority style of interaction between management and managed systems, level of centralization, orientation, consideration of environmental impact, contents, type of activity, and response to deviation. Within terms of the attribute of response to deviations, place of the stress management is allocated near to the harmonic and the risk management. It has been substantiated that the stress management is the enterprise management system aimed at overcoming unwanted deviations that are significant, extreme, and have a significant negative impact on the operation of enterprise. In the structure of the stress management, the following integral components have been allocated and characterized: crisis, adaptive, reactive, fears, and anticipative.

  17. Mobile Identity Management

    NARCIS (Netherlands)

    Hoepman, J.J.

    2011-01-01

    Identity management consists of the processes and all underlying technologies for the creation, management, and usage of digital identities. Business rely on identity management systems to simplify the management of access rights to their systems and services for both their employees and their

  18. Management systems for regulatory authorities

    International Nuclear Information System (INIS)

    Mpandanyama, Rujeko Lynette

    2015-02-01

    For a regulatory body to fulfil its statutory obligations, there is need to develop and implement a regulatory management system that has the necessary arrangements for achieving and maintaining high quality performance in regulating the safety of nuclear and radiation facilities under its authority. Hence, the regulatory management system needs to fully integrate the human resources, processes and physical resources of the organization. This study sought to provide an understanding of the concept, principles, policies and fundamentals of management systems as they relate to regulatory systems in the field of radiation protection and to make appropriate recommendations to ensure that an effective management system exists for the control of ionizing radiation and radiation sources and addresses all relevant stakeholders in Zimbabwe. A comparative analysis was done on the current management status and the ideal management system, which led to the identification of the gaps existing. The main key that was found to be of significance was lack of linkages between processes and management tools within the institution. (au)

  19. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  20. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  1. Systemic hypertension and the right-sided cardiovascular system: a review of the available evidence.

    Science.gov (United States)

    Pedrinelli, Roberto; Dell'Omo, Giulia; Talini, Enrica; Canale, Maria Laura; Di Bello, Vitantonio

    2009-02-01

    Abnormal vasoconstriction of the lesser circulation characterizes a subset of patients with essential hypertension, a possible effect of mechanisms, such as enhanced sympathetic tone, increased delivery of blood-borne vasoconstrictor substances or abnormal local release of vasoactive factors, acting on both sides of the circulation or to backward transmission of increased pressure due to stiffer left ventricles with more advanced diastolic dysfunction. Elevated systemic pressure also associates with thickening of the right ventricle, a central element of the low-pressure system. Right ventricular remodelling develops in parallel with a similar process occurring at the left side, likely as a result of ventricular interdependence under the influence of trophic factors targeting both ventricles, though other mechanisms, including increased pulmonary afterload, may also be operative. By and large independent of the extent of structural remodelling of both ventricles, systemic hypertension also conditions an impaired filling rate of the right ventricle that accompanies a similar phenomenon at the left side. Thus, quite in contrast with the common and simplistic assumption of a separate behaviour of the two ventricles, the right-sided cardiovascular system is not immune to the effect of systemic hypertension, a concept whose clinical and pathophysiological implications require further studies.

  2. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  3. 14 CFR 1212.704 - System manager.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false System manager. 1212.704 Section 1212.704... Authority and Responsibilities § 1212.704 System manager. (a) Each system manager is responsible for the following with regard to the system of records over which the system manager has cognizance: (1) Overall...

  4. Using automated environmental management information systems to enable compliance: Ten questions to answer before selecting a software system

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, J.B.

    1999-07-01

    As technology invades the arena of environmental information management, hundreds of software packages have become available in the marketplace. How does the already overwhelmed environmental manager or IT professional decide what's right for the organization? Is there a software package that meets the needs of the organization, and is there a successful way to implement the system? Does this require abandoning existing systems with which users are comfortable? Can the system really save time and/or money? This paper discusses three topics: What drives the need for a system; Ten questions to aid in selecting a system that is right for your organization; and enabling technology and software systems available today, and the future application of technology to environmental data management. Motivating factors for EMIS include regulatory, business and IT drivers. Because of the ever-increasing regulatory burden, the need to demonstrate compliance often is the strongest driver. But they cannot ignore business and IT drivers from the discussion, especially with issues such as Enterprise Resource Planning and The Year 2000 impacting many systems projects. Before selecting a system, the organization should address, at a minimum, the following ten issues: (1) Organization objectives; (2) Organization readiness; (3) High-level processes to be automated; (4) Integration and interfaces; (5) User community and needs; (6) Technical requirements; (7) Degree of customization; (8) Project timing; (9) Implementation resource needs; and (10) System justification. Today, there are hundreds of EH and S software packages available too help automate daily business processes. Only a few are multimedia packages, and all require significant implementation efforts. The EMIS market is still evolving, and software vendors continue to enhance product features and usability.

  5. Greening MSW management systems by saving footprint: The contribution of the waste transportation.

    Science.gov (United States)

    Peri, G; Ferrante, P; La Gennusa, M; Pianello, C; Rizzo, G

    2018-05-03

    Municipal solid waste (MSW) management constitutes a highly challenging issue to cope with in order of moving towards more sustainable urban policies. Despite new Standards call for recycling and reusing materials contained in the urban waste, several municipalities still use landfilling as a waste disposal method. Other than the environmental pressure exerted by these plants, waste transportation from the collection points to the landfill needs a specific attention to correctly assess the whole burden of the waste management systems. In this paper, the Ecological Footprint (EF) indicator is applied to the actual MSW of the city of Palermo (Sicily). Results show that the effects produced by the involved transportation vehicles are not negligible, compared to those generated by the other segments of the waste management system. This issue is further deepened by analysing the role of transportation in an upgraded waste management system that is represented by the newly designed waste management plan of Palermo. The computed saved ecological footprint is used here for suitably comparing the environmental performances of the MSW system in both scenarios. Finally, the suitability of the EF method to address not only complete waste management plans but also single segments of the waste management system, is also discussed. Copyright © 2018 Elsevier Ltd. All rights reserved.

  6. Program management system manual

    International Nuclear Information System (INIS)

    1989-08-01

    OCRWM has developed a program management system (PMS) to assist in organizing, planning, directing and controlling the Civilian Radioactive Waste Management Program. A well defined management system is necessary because: (1) the Program is a complex technical undertaking with a large number of participants, (2) the disposal and storage facilities to be developed by the Program must be licensed by the Nuclear Regulatory Commission (NRC) and hence are subject to rigorous quality assurance (QA) requirements, (3) the legislation mandating the Program creates a dichotomy between demanding schedules of performance and a requirement for close and continuous consultation and cooperation with external entities, (4) the various elements of the Program must be managed as parts of an integrated waste management system, (5) the Program has an estimated total system life cycle cost of over $30 billion, and (6) the Program has a unique fiduciary responsibility to the owners and generators of the nuclear waste for controlling costs and minimizing the user fees paid into the Nuclear Waste Fund. This PMS Manual is designed and structured to facilitate strong, effective Program management by providing policies and requirements for organizing, planning, directing and controlling the major Program functions

  7. Coordinated management of combined sewer overflows by means of environmental decision support systems.

    Science.gov (United States)

    Murla, Damian; Gutierrez, Oriol; Martinez, Montse; Suñer, David; Malgrat, Pere; Poch, Manel

    2016-04-15

    During heavy rainfall, the capacity of sewer systems and wastewater treatment plants may be surcharged producing uncontrolled wastewater discharges and a depletion of the environmental quality. Therefore there is a need of advanced management tools to tackle with these complex problems. In this paper an environmental decision support system (EDSS), based on the integration of mathematical modeling and knowledge-based systems, has been developed for the coordinated management of urban wastewater systems (UWS) to control and minimize uncontrolled wastewater spills. Effectiveness of the EDSS has been tested in a specially designed virtual UWS, including two sewers systems, two WWTP and one river subjected to typical Mediterranean rain conditions. Results show that sewer systems, retention tanks and wastewater treatment plants improve their performance under wet weather conditions and that EDSS can be very effective tools to improve the management and prevent the system from possible uncontrolled wastewater discharges. Copyright © 2016 Elsevier B.V. All rights reserved.

  8. Ways to integrate document management systems with industrial plant configuration management systems

    International Nuclear Information System (INIS)

    Munoz, M.

    1995-01-01

    Based on experience gained from tasks carried out for Almaraz Nuclear Power Plant, this paper describes computer platforms used both at the power plant and in the main offices of the engineering company. Subsequently, a description is given of the procedure followed for the continuous up-dating of plant documentation, in order to maintain consistency with other information stored in data bases in the Operation Management System, Maintenance System, Modification Management System, etc. The work method used for the unitary updating of all information (document images and attributes corresponding to the different data bases), following refuelling procedures is also described. Lastly, the paper describes the functions and the user interface of the system used in the power plant for document management. (Author)

  9. Management Information Systems at CERN

    CERN Document Server

    Ferguson, J

    1986-01-01

    The specific areas addressed in the study are 1.Management decision support (data presentation, data base management systems â" DBMS, modeling) 2.Text processing, 3.Electronic communication for management purposes, 4.Office automation, 5.Administrative use of Management Information Systems (MIS) and in particular Administrative Data Processing (ADP).

  10. Disaster Management: AN Integral Part of Science & Technology System and Land Administration-Management System

    Science.gov (United States)

    Ghawana, T.; Zlatanova, S.

    2016-06-01

    Disaster management is a multidisciplinary field, which requires a general coordination approach as well as specialist approaches. Science and Technology system of a country allows to create policies and execution of technical inputs required which provide services for the specific types of disasters management. Land administration and management agencies, as the administrative and management bodies, focus more on the coordination of designated tasks to various agencies responsible for their dedicated roles. They get help from Scientific and technical inputs & policies which require to be implemented in a professional manner. The paper provides an example of such integration from India where these two systems complement each other with their dedicated services. Delhi, the Capital of India, has such a disaster management system which has lot of technical departments of government which are mandated to provide their services as Emergency Service Functionaries. Thus, it is shown that disaster management is a job which is an integral part of Science & Technology system of a country while being implemented primarily with the help of land administration and management agencies. It is required that new policies or mandates for the Science and technology organizations of government should give a primary space to disaster management

  11. Integration of project management and systems engineering: Tools for a total-cycle environmental management system

    International Nuclear Information System (INIS)

    Blacker, P.B.; Winston, R.

    1997-01-01

    An expedited environmental management process has been developed at the Idaho National Engineering and Environmental Laboratory (INEEL). This process is one result of the Lockheed Martin commitment to the US Department of Energy to incorporate proven systems engineering practices with project management and program controls practices at the INEEL. Lockheed Martin uses a graded approach of its management, operations, and systems activities to tailor the level of control to the needs of the individual projects. The Lockheed Martin definition of systems engineering is: ''''Systems Engineering is a proven discipline that defines and manages program requirements, controls risk, ensures program efficiency, supports informed decision making, and verifies that products and services meet customer needs.'''' This paper discusses: the need for an expedited environmental management process; how the system was developed; what the system is; what the system does; and an overview of key components of the process

  12. CIMS: The Cartographic Information Management System,

    Science.gov (United States)

    1981-01-01

    use. Large-scale information systems may cover large amounts of information such as the Land Identification and Information Management System (LIMS...small computer in managing the information holdings of a mapping institute. The result is the Cartographic Information Management System (CIMS), a...American countrie.s. 1 .- - _ _ _ _. = _ m m m THE CARTOGRAPHIC INFORMATION MANAGEMENT SYSTEM System Rationale Interactive computer-assisted cartography

  13. Requirements for VICTORIA Class Fire Control System: Contact Management Function

    Science.gov (United States)

    2014-07-01

    Requirements for VICTORIA Class Fire Control System Contact Management Function Tab Lamoureux CAE Integrated Enterprise Solutions...Contract Report DRDC-RDDC-2014-C190 July 2014 © Her Majesty the Queen in Right of Canada, as represented by the...i Abstract …….. The VICTORIA Class Submarines (VCS) are subject to a continuing program of technical upgrades. One such program is

  14. Lithium battery management system

    Science.gov (United States)

    Dougherty, Thomas J [Waukesha, WI

    2012-05-08

    Provided is a system for managing a lithium battery system having a plurality of cells. The battery system comprises a variable-resistance element electrically connected to a cell and located proximate a portion of the cell; and a device for determining, utilizing the variable-resistance element, whether the temperature of the cell has exceeded a predetermined threshold. A method of managing the temperature of a lithium battery system is also included.

  15. Finding the right answer: an information retrieval approach supporting knowledge sharing

    NARCIS (Netherlands)

    Gomes Ludermir, P.; Guizzardi-Silva Souza, R.; Sona, D.; Dignum, F.; Dignum, V.; Koenig, S.; Kraus, S.; Singh, M.P.; Wooldridge, M.

    Knowledge Management can be defined as the effective strategies to get the right piece of knowledge to the right person in the right time. Having the main purpose of providing users with information items of their interest, recommender systems seem to be quite valuable for organizational knowledge

  16. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  17. Archival Information Management System.

    Science.gov (United States)

    1995-02-01

    management system named Archival Information Management System (AIMS), designed to meet the audit trail requirement for studies completed under the...are to be archived to the extent that future reproducibility and interrogation of results will exist. This report presents a prototype information

  18. Synergy with HST and JWST Data Management Systems

    Science.gov (United States)

    Greene, Gretchen; Space Telescope Data Management Team

    2014-01-01

    The data processing and archive systems for the JWST will contain a petabyte of science data and the best news is that users will have fast access to the latest calibrations through a variety of new services. With a synergistic approach currently underway with the STScI science operations between the Hubble Space Telescope and James Webb Space Telescope data management subsystems (DMS), operational verification is right around the corner. Next year the HST archive will provide scientists on-demand fully calibrated data products via the Mikulski Archive for Space Telescopes (MAST), which takes advantage of an upgraded DMS. This enhanced system, developed jointly with the JWST DMS is based on a new CONDOR distributed processing system capable of reprocessing data using a prioritization queue which runs in the background. A Calibration Reference Data System manages the latest optimal configuration for each scientific instrument pipeline. Science users will be able to search and discover the growing MAST archive calibrated datasets from these missions along with the other multiple mission holdings both local to MAST and available through the Virtual Observatory. JWST data systems will build upon the successes and lessons learned from the HST legacy and move us forward into the next generation of multi-wavelength archive research.

  19. System Security Management in SNMP

    OpenAIRE

    P. Deivendran; Dr. R. Dhanapal Ph.D

    2010-01-01

    We present a framework for managing system security, based on a SNMP Management Information Base (MIB), namely the System Security MIB (SSEC MIB), We have defined managed objects and completed the ASN.1 description of the MIB that embeds them. The related security management functions are mainly focused on monitoring external script execution for system security scanning and access control. The main goal of this work is to introduce the semantics and a standard interface that will allow the r...

  20. Electrical Power System Design and Station Blackout (SBO) Management in Indian Fast Breeder Reactors

    International Nuclear Information System (INIS)

    Vijaya, N. M.; Theivarajan, N.; Madhusoodanan, K.

    2015-01-01

    In the nuclear new builds and projects in design stage SBO management measures have significant role. Depending on the onsite and offsite power supply configurations, deterministic SBO duration is established. Design of systems with adequately sized battery capacities for SBO duration, special SBO Diesel Generator Sets, structured load shedding strategy to conserve battery availability to cope with SBO and to monitor the plant safety beyond SBO duration are considered as part of electrical system design now. In the design of PFBR, SBO is given due importance right from conceptual design stage. Both deterministic SBO duration and probabilistic SBO duration versus frequency were established by detailed analysis. Dedicated DC power supply systems and additional SBO DG back-up systems are in place to cope with normal and extended SBO. After the Fukushima event, there is greater requirement to demonstrate plant safety during SBO for a long duration extended over several days. In light of this accident, thermal hydraulic synthesis of PFBR has been carried out to ascertain the capability of the plant to manage a prolonged station blackout event. This has brought out the robustness of the design. Safety design features of PFBR ensure comfortable management of extended SBO. In the design of future FBR projects, current trends in the new nuclear builds and recommendations of international bodies considering Fukushima are duly considered. SBO measures by means of alternate AC power sources, redundant emergency power supply sources with less dependence on other auxiliary systems and dedicated DC power systems are considered to cope with normal and extended SBO beyond design basis. Right from the conceptual design, the system robustness to manage normal and extended SBO will be taken care with the related thermal hydraulic and associated analysis. The paper highlights these SBO management strategies in PFBR and future FBRs. (author)

  1. MAINTENANCE MANAGEMENT ACCOUNTING SYSTEM OF WASTE WATER DISPOSAL SYSTEMS

    Science.gov (United States)

    Hori, Michihiro; Tsuruta, Takashi; Kaito, Kiyoyuki; Kobayashi, Kiyoshi

    Sewage works facilities consist of various assets groups. And there are many kinds of financial resources. In order to optimize the maintenance plan, and to secure the stability and sustainability of sewage works management, it is necessary to carry out financial simulation based on the life-cycle cost analysis. Furthermore, it is important to develop management accounting system that is interlinked with the financial accounting system, because many sewage administration bodies have their financial accounting systems as public enterprises. In this paper, a management accounting system, which is designed to provide basic information for asset management of sewage works facilities, is presented. Also the applicability of the management accounting system presented in this paper is examined through financial simulations.

  2. Program Management System manual

    International Nuclear Information System (INIS)

    1986-01-01

    The Program Management System (PMS), as detailed in this manual, consists of all the plans, policies, procedure, systems, and processes that, taken together, serve as a mechanism for managing the various subprograms and program elements in a cohesive, cost-effective manner. The PMS is consistent with the requirements of the Nuclear Waste Policy Act of 1982 and the ''Mission Plan for the Civilian Radioactive Waste Management Program'' (DOE/RW-0005). It is based on, but goes beyond, the Department of Energy (DOE) management policies and procedures applicable to all DOE programs by adapting these directives to the specific needs of the Civilian Radioactive Waste Management program. This PMS Manual describes the hierarchy of plans required to develop and maintain the cost, schedule, and technical baselines at the various organizational levels of the Civilian Radioactive Waste Management Program. It also establishes the management policies and procedures used in the implementation of the Program. These include requirements for internal reports, data, and other information; systems engineering management; regulatory compliance; safety; quality assurance; and institutional affairs. Although expanded versions of many of these plans, policies, and procedures are found in separate documents, they are an integral part of this manual. The PMS provides the basis for the effective management that is needed to ensure that the Civilian Radioactive Waste Management Program fulfills the mandate of the Nuclear Waste Policy Act of 1982. 5 figs., 2 tabs

  3. The Resource Manager the ATLAS Trigger and Data Acquisition System

    Science.gov (United States)

    Aleksandrov, I.; Avolio, G.; Lehmann Miotto, G.; Soloviev, I.

    2017-10-01

    The Resource Manager is one of the core components of the Data Acquisition system of the ATLAS experiment at the LHC. The Resource Manager marshals the right for applications to access resources which may exist in multiple but limited copies, in order to avoid conflicts due to program faults or operator errors. The access to resources is managed in a manner similar to what a lock manager would do in other software systems. All the available resources and their association to software processes are described in the Data Acquisition configuration database. The Resource Manager is queried about the availability of resources every time an application needs to be started. The Resource Manager’s design is based on a client-server model, hence it consists of two components: the Resource Manager “server” application and the “client” shared library. The Resource Manager server implements all the needed functionalities, while the Resource Manager client library provides remote access to the “server” (i.e., to allocate and free resources, to query about the status of resources). During the LHC’s Long Shutdown period, the Resource Manager’s requirements have been reviewed at the light of the experience gained during the LHC’s Run 1. As a consequence, the Resource Manager has undergone a full re-design and re-implementation cycle with the result of a reduction of the code base by 40% with respect to the previous implementation. This contribution will focus on the way the design and the implementation of the Resource Manager could leverage the new features available in the C++11 standard, and how the introduction of external libraries (like Boost multi-container) led to a more maintainable system. Additionally, particular attention will be given to the technical solutions adopted to ensure the Resource Manager could effort the typical requests rates of the Data Acquisition system, which is about 30000 requests in a time window of few seconds coming from more

  4. Building Prevention to Protect: The Inter-American Human Rights System

    Directory of Open Access Journals (Sweden)

    Carlos Portales

    2017-03-01

    Full Text Available The article explores the way that the Inter-American human rights system assumes the “responsibility to protect” in the context of serious violations of human rights that can be characterized as war crimes, crimes against humanity, genocide, and ethnic cleansing. The essay describes  how the Inter-American Commission on Human Rights and the Inter-American Court of Human Rights have responded to such situations by using the ample powers granted to them by the OAS member states. The authors consider that these organs have been some of the most effective tools with which this region has confronted such situations by seeking system has contributed to building democratic regimes in the majority of the countries of the hemisphere. This has been crucial to avoiding serious violations of human rights such as those mentioned above, which would have required urgent international intervention to overcome.

  5. Managing Temporal Knowledge in Port Management Systems

    Directory of Open Access Journals (Sweden)

    Anita Gudelj

    2006-05-01

    Full Text Available Large ports need to deal with a number of disparate activities:the movement of ships, containers and other cargo, theloading and unloading of ships and containers, customs activities.As well as human resources, anchorages, channels, lighters,tugs, berths, warehouse and other storage spaces have to beallocated and released. The efficient management of a port involvesmanaging these activities and resources, managing theflows of money involved between the agents providing and usingthese resources, and providing management information.Many information systems will be involved.Many applications have to deal with a large amount of datawhich not only represent the perceived state of the real world atpresent, but also past and/or future states. These applicationsare not served adequately by today's computer managementand database systems. In particular, deletions and updates insuch systems have destructive semantics. This means that previousdatabase contents (representing previous perceived statesof the real world cannot be accessed anymore.A review of how define temporal data models, based ongeneralizing a non-temporal data model in to a temporal one toimprove port management is presented. This paper describes apractical experiment which supports managing temporal dataalong with the corresponding prototype implementations.

  6. A site specific approach to life cycle managment of labour rights issues

    DEFF Research Database (Denmark)

    Dreyer, Louise Camilla

    not beyond dismissing suppliers and sub-contractors located in high risk environments. Balancing feasibility on one hand and reliability and relevance of results on the other hand is the challenge for a Social LCA method supporting life cycle management. This presentation offers a toolbox for prioritisation...... issues in the product chain through dialogue and partnership. The presented work is based on 5 years of research and practical CSR work in a globally operating Danish Corporation.......It can be observed from companies’ public sustainability commitments and increasing participation in voluntary social responsibility or accountability initiatives like Global Compact and ISO26000 or certification schemes like SA8000 that management of labour rights issues in the product chain...

  7. Renegotiating property rights in the Florida golden crab fishery

    Directory of Open Access Journals (Sweden)

    Scott Crosson

    2013-08-01

    Full Text Available The golden crab (Chaceon fenneri supports a small, economically healthy fishery in south Florida. Crabbers in the fishery have successfully protected themselves against larger outside fishing interests in the past, and management has been stable for over fifteen years.  Why, then, did a portion of the fleet propose shifting to individual transferable quotas (ITQs?  Our findings suggest that proponents sought ITQ management because they believed it would further limit the ability of other crabbers to enter the fishery and act as a mechanism to legally preserve the informal and formal property rights that they have previously negotiated among themselves. Opponents believed that a shift to an ITQ regime would destroy those same property rights.  We explore the implications of these findings to a broader understanding of property rights and natural resource management institutions, noting that the currently existing system closely resembles a territorial use rights fishery (TURF.

  8. Environmental asset management: Risk management systems

    CSIR Research Space (South Africa)

    Naudé, Brian

    2017-07-01

    Full Text Available bnaude@csir.co.za Charl Petzer Council for Scientific and Industrial Research PO Box 395 Pretoria 0001 South Africa +2712 841 4292 CPetzer1@csir.co.za Copyright © 2017 by B Naudé, C Petzer. Published and used by INCOSE with permission.... Charl Petzer is registered professional engineer with 30 years of programme/project management as well as systems engineering experience in military and other environments. He has been the lead systems engineer, as well as programme manager on several...

  9. Water management - management actions applied to water resources system

    International Nuclear Information System (INIS)

    Petkovski, Ljupcho; Tanchev, Ljubomir

    2001-01-01

    In this paper are presented a general description of water resource systems, a systematisation of the management tasks and the approaches for solution, including a review of methods used for solution of water management tasks and the fundamental postulates in the management. The management of water resources is a synonym for the management actions applied to water resource systems. It is a general term that unites planning and exploitation of the systems. The modern planning assumes separating the water racecourse part from the hydro technical part of the project. The water resource study is concerned with the solution for the resource problem. This means the parameters of the system are determined in parallel with the definition of the water utilisation regime. The hydro-technical part of the project is the design of structures necessary for the water resource solution. (Original)

  10. The development of KAERI management information system (II) -The development of Time Sheet Management System-

    International Nuclear Information System (INIS)

    Kang, Sin Bok; Kim, Yeong Taek; Park, Soo Jin; Ko, Yeong Cheol; Lee, Jong Bok; Han, Eun Sook; Kim, Hyeon Jeong

    1994-01-01

    The purpose of this report is to describe the work done for the development, operation and maintenance of Time Sheet Management System. This work is a part of the development KAERI management information system. Manpower management is essential to cope with the external circumstances promptly and to maximize the productivity of the organization. This work aims at setting up a basis for the manpower management system. It is widely recognized that neither timely decision making nor competitive edge can be secured with the traditional management technology in so a rapidly changing situations home and abroad, which can be characterized by openness and informality. The necessity of efficient and scientific man-power management by time-study has emerged on the reorganization of KAERI by expanding matrix system in order to enhance the R and D productivity. (Author)

  11. The success of a management information system in health care - a case study from Finland.

    Science.gov (United States)

    Kivinen, Tuula; Lammintakanen, Johanna

    2013-02-01

    The purpose of this article is to describe perspectives on information availability and information use among users of a management information system in one specialized health care organization. The management information system (MIS) is defined as the information system that provides management with information about financial and operational aspects of hospital management. The material for this qualitative case study was gathered by semi-structured interviews. The interviewees were purposefully selected from one specialized health care organization. The organization has developed its management information system in recent years. Altogether 13 front-line, middle and top-level managers were interviewed. The two themes discussed were information availability and information use. The data were analyzed using inductive content analysis using ATLAS.ti computer program. The main category "usage of management information system" consisted of four sub-categories: (1) system quality, (2) information quality, (3) use and user satisfaction and (4) development of information culture. There were many organizational and cultural aspects which influence the use of MIS in addition to factors concerning system usability and users. The connection between information culture and information use was recognized and the managers proposed numerous ways to increase the use of information in management work. The implementation and use of management information system did not seem to be planned as an essential tool in strategic information management in the health care organization studied. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  12. Credit Management System

    Data.gov (United States)

    US Agency for International Development — Credit Management System. Outsourced Internet-based application. CMS stores and processes data related to USAID credit programs. The system provides information...

  13. Medical Information Management System

    Science.gov (United States)

    Alterescu, S.; Hipkins, K. R.; Friedman, C. A.

    1979-01-01

    On-line interactive information processing system easily and rapidly handles all aspects of data management related to patient care. General purpose system is flexible enough to be applied to other data management situations found in areas such as occupational safety data, judicial information, or personnel records.

  14. Systems management of facilities agreements

    International Nuclear Information System (INIS)

    Blundell, A.

    1998-01-01

    The various types of facilities agreements, the historical obstacles to implementation of agreement management systems and the new opportunities emerging as industry is beginning to make an effort to overcome these obstacles, are reviewed. Barriers to computerized agreement management systems (lack of consistency, lack of standards, scarcity of appropriate computer software) are discussed. Characteristic features of a model facilities agreement management system and the forces driving the changing attitudes towards such systems (e.g. mergers) are also described

  15. Senior Management Use of Management Control Systems in Large Companies

    DEFF Research Database (Denmark)

    Willert, Jeanette; Israelsen, Poul; Rohde, Carsten

    2017-01-01

    The use of management control systems in large companies remains relatively unexplored. Indeed, only a few studies of senior managers’ use of management control systems consider multiple controls in companies. This paper explores data from a comprehensive survey of the use of management control...... systems in 120 strategic business units at some of the largest companies in Denmark. The paper identifies how senior management guides and controls their subordinates to meet their companies’ objectives. The presentation and discussion of the results, including citations from executive managers, use...

  16. THE RESALE RIGHT

    Directory of Open Access Journals (Sweden)

    Ana-Maria MARINESCU

    2017-05-01

    Full Text Available The article analyses one of the most important rights of the authors of original works of art namely: the resale right. It will be analyzed the subject matter of the resale right, the works of art to which the resale right relates, the rates applicable to the resale right, the persons entitled to receive royalties, the term of protection of the resale right, third-country nationals entitled to receive royalties and the right to obtain information. Also, the article will refer to the EU Directive in the field: Directive 2001/84/EC of the European Parliament and of the Council of 27 September 2001 on the resale right for the benefit of the author of an original work of art. It will be the subject of the article, also, the European Court of Justice jurisprudence related to the resale right, for example the judgment in the case C-518/08 (VEGAP vs. ADAGP, underlying that, in the light of the objectives pursued by Directive 2001/84, Member States may make their own legislative choice in determining the categories of persons capable of benefiting from the resale right after the death of the author of a work of art. One of parts of the article, will analyses the collective management for the resale right, especially: the terms of the collective management, forms of the collective management and examples. For all the above mentioned reasons, the article will refer to the main aspects of the resale right in a comprehensive manner and will analyses in a scientifically manner this very important right of the authors of original works of art.

  17. Forest rights

    DEFF Research Database (Denmark)

    Balooni, Kulbhushan; Lund, Jens Friis

    2014-01-01

    One of the proposed strategies for implementation of reducing emissions from deforestation and forest degradation plus (REDD+) is to incentivize conservation of forests managed by communities under decentralized forest management. Yet, we argue that this is a challenging road to REDD+ because...... conservation of forests under existing decentralized management arrangements toward a push for extending the coverage of forests under decentralized management, making forest rights the hard currency of REDD+....

  18. The Evolution of Human Rights Protection within the EU Legal System

    OpenAIRE

    Tăbușcă Silvia

    2012-01-01

    Having in mind the EU’s policy to rebuild the democratic systems within the former Europeancommunist countries and its involvement in international actions regarding human rights enforcement, thereis no doubt about the importance of individuals rights protection in the European Union’s legal system. In thisrespect, the present paper analyzes the evolution of the principle of EU’s human rights protection. Theresearch done on the EU legislation and courts’ jurisprudence shows that there are thr...

  19. Networked inventory management systems: materializing supply chain management

    NARCIS (Netherlands)

    Verwijmeren, M.A.A.P.; Vlist, van der P.; Donselaar, van K.H.

    1996-01-01

    Aims to explain the driving forces for networked inventory management. Discusses major developments with respect to customer requirements, networked organizations and networked inventory management. Presents high level specifications of networked inventory management information systems (NIMISs).

  20. System analysis for radwaste management

    International Nuclear Information System (INIS)

    Lennemann, W.L.

    1987-01-01

    The most logical approach to evaluating radioactive waste management processes and their options is to consider radioactive waste management, handling, and disposal as a complete and complex system from the waste arisings to their disposition. The principal elements that should be considered or taken into account when making a decision involving one or more components of a radwaste management system essentially concern radiation doses or detriments- both radiological and industrial safety and both capital investments and operating costs. This paper discusses the system analysis of the low- and medium-level radioactive waste management

  1. Electrical distribution system management

    International Nuclear Information System (INIS)

    Hajos, L.; Mortarulo, M.; Chang, K.; Sparks, T.

    1990-01-01

    This paper reports that maintenance of electrical system data is essential to the operation, maintenance, and modification of a nuclear station. Load and equipment changes affect equipment sizing, available short-circuit currents and protection coordination. System parameters must be maintained in a controlled manner to enable evaluation of proposed modifications and provide adequate verification and traceability. For this purpose, Public Service Electric and Gas Company has implemented a Verified and Validated Electric Distribution System Management (EDSM) program at the Hope Creek and Salem Nuclear Power Stations. EDSM program integrates computerized configuration management of electrical systems with calculational software the Technical Standard procedures. The software platform is PC-based. The Database Manager and Calculational programs have been linked together through a user friendly menu system. The database management nodule enable s assembly and maintenance of databases for individual loads, buses, and branches within the electrical systems with system access and approval controlled through electronic security incorporated within the database manger. Reports drawn from the database serve as the as-built and/or as-designed record of the system configurations. This module also creates input data files of network parameters in a format readable by the calculational modules. Calculations modules provide load flow, voltage drop, motor starting, and short-circuit analyses, as well as dynamic analyses of bus transfers

  2. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  3. Environmental management system in companies

    International Nuclear Information System (INIS)

    Bonanno, C.

    1995-01-01

    The environmental management system, as the whole coordinated initiatives 'environmental oriented' introduced by companies in their organization, is discussed. Strategic weight that companies have to be present at the environmental management system is enlisted. Finally, the new professional figures of environmental technicians and environmental manager is discussed

  4. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Verho, P.; Jaerventausta, P.; Kaerenlampi, M.; Paulasaari, H. [Tampere Univ. of Technology (Finland); Partanen, J. [Lappeenranta Univ. of Technology (Finland)

    1996-12-31

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion of the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the vendors of the other systems. In the research project this alternative is preferred and used in developing an independent distribution management system

  5. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Verho, P; Jaerventausta, P; Kaerenlampi, M; Paulasaari, H [Tampere Univ. of Technology (Finland); Partanen, J [Lappeenranta Univ. of Technology (Finland)

    1997-12-31

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion of the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the vendors of the other systems. In the research project this alternative is preferred and used in developing an independent distribution management system

  6. Integrated System Health Management: Foundational Concepts, Approach, and Implementation.

    Science.gov (United States)

    Figueroa, Fernando; Schmalzel, John; Walker, Mark; Venkatesh, Meera; Kapadia, Ravi; Morris, Jon; Turowski, Mark; Smith, Harvey

    2009-01-01

    Implementation of integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive to an accurate and reliable assessment of its health. We present concepts, procedures, and a specific approach as a foundation for implementing a credible ISHM capability. The capability stresses integration of DIaK from all elements of a system. The intent is also to make possible implementation of on-board ISHM capability, in contrast to a remote capability. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems (rocket engine test facilities). The paper will address the following topics: 1. ISHM Model of a system 2. Detection of anomaly indicators. 3. Determination and confirmation of anomalies. 4. Diagnostic of causes and determination of effects. 5. Consistency checking cycle. 6. Management of health information 7. User Interfaces 8. Example implementation ISHM has been defined from many perspectives. We define it as a capability that might be achieved by various approaches. We describe a specific approach that has been matured throughout many years of development, and pilot implementations. ISHM is a capability that is achieved by integrating data, information, and knowledge (DIaK) that might be distributed throughout the system elements (which inherently implies capability to manage DIaK associated with distributed sub-systems). DIaK must be available to any element of a system at the right time and in accordance with a meaningful context. ISHM Functional Capability Level (FCL) is measured by how well a system performs the following

  7. Management analysis for special competitions based on ISO 9001:2008 Quality management systems, ISO 1400:2004 Environmental management systems and OHSAS 18001:2007 Occupational health and safety management systems

    OpenAIRE

    Alcalá Ortiz, Gabriela José

    2015-01-01

    ABSTRACT: This paper aims to analyze the managing condition of the participating projects in the competition Solar Decathlon Europe 2014, depart from that, a suitable integrated management system is proposed. The analysis was accomplished due to the design and application of a questionnaire based in ISO standards, concerning quality, environmental and health and safety management. The results showed the weakness regarding management system, this means the lack of integrated policy, inte...

  8. Design of distributed systems of hydrolithosphere processes management. A synthesis of distributed management systems

    Science.gov (United States)

    Pershin, I. M.; Pervukhin, D. A.; Ilyushin, Y. V.; Afanaseva, O. V.

    2017-10-01

    The paper considers an important problem of designing distributed systems of hydrolithosphere processes management. The control actions on the hydrolithosphere processes under consideration are implemented by a set of extractive wells. The article shows the method of defining the approximation links for description of the dynamic characteristics of hydrolithosphere processes. The structure of distributed regulators, used in the management systems by the considered processes, is presented. The paper analyses the results of the synthesis of the distributed management system and the results of modelling the closed-loop control system by the parameters of the hydrolithosphere process.

  9. Efficiency audit for IT-systems of state management strategic objects

    Directory of Open Access Journals (Sweden)

    Abasov V.A.

    2017-06-01

    Full Text Available Hackers’ attacks at the end of 2016 and at the beginning of 2017 р. on governmental information and telecommunication systems, including Ministry of Finance in Ukraine, and State Treasury Department, caused vast delays in budgetary payments. They showed «sensitiveness» and insecurity of governmental institutions for cyber-attacks because of control absence of three main security measures, such as technical limitations for downloading programs, limited use of rights for local administrators, systematical software renewals. International experience shows these security measures of governmental IT-systems have to be the audit subject of state financial control authorities. The base of information technology audit was initiated in the studies of І.К. Drozd, S.V. Іvachnenkova, М.М. Benko, Ju.А. Кuxminskiy, А.V. Мamyshev. Simultaneously, the issue of IT-system state audit was examined in theoretical researches partially because there is no practice of such audit in Ukraine. That is why it is necessary to learn international practice of efficiency audit for IT-systems and world standards for establishments of state management sector. The research allowed to propose the methodology of efficiency audit for IT-systems for state institutions; the methodology provides planning and conducting the main procedures on the base of risk estimation of security threats for information systems. The author determines the peculiarities in security risk management for IT-systems by means of risk estimation of security components of IT-systems while conducting efficiency audit. The author sets the method of descending step-by-step detailing for audit estimation of IT-system risk management efficiency at strategic enterprises belonging to state management sector by means of adaptation of ISSAI standard norms. The paper proposes three possible options of management solution concerning IT-system risk management efficiency on the base of information about the

  10. E-Books and DRM: Rights Management Solutions, Extant Automation Systems, and Institutional Owners/Lenders. (SIGs LAN, PUB: Library Automation, Networks and Information Generation and Publication).

    Science.gov (United States)

    Little, John R.

    2000-01-01

    Outlines a planned panel discussion on electronic books and DRM (Digital Rights Management). Highlights include publisher's choice of format to protect content; institutional needs; circulating library materials to authorized users; integrating the electronic collection with the rest of the collection; integrating DRM with current library…

  11. Nova laser assurance-management system

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    In a well managed project, Quality Assurance is an integral part of the management activities performed on a daily basis. Management assures successful performance within budget and on schedule by using all the good business, scientific, engineering, quality assurance, and safety practices available. Quality assurance and safety practices employed on Nova are put in perspective by integrating them into the overall function of good project management. The Nova assurance management system was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management system. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  12. Pembangunan Model Restaurant Management System

    Directory of Open Access Journals (Sweden)

    Fredy Jingga

    2014-12-01

    Full Text Available Model design for Restaurant Management System aims to help in restaurant business process, where Restaurant Management System (RMS help the waitress and chef could interact each other without paper limitation.  This Restaurant Management System Model develop using Agile Methodology and developed based on PHP Programming Langguage. The database management system is using MySQL. This web-based application model will enable the waitress and the chef to interact in realtime, from the time they accept the customer order until the chef could know what to cook and checklist for the waitress wheter the order is fullfill or not, until the cahsier that will calculate the bill and the payment that they accep from the customer.

  13. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  14. Analysis of Knowledge Management Effectiveness on Business Excellence Using System Dynamics

    Directory of Open Access Journals (Sweden)

    mohammad dehghani saryazdi

    2014-05-01

    Full Text Available It can be claimed that an organization is approaching excellence when it achieves acceptable results besides providing appropriate infrastructures and following right processes. Excellence models, such as European Foundation of Quality Management (EFQM, try to establish a tradeoff between enablers and outcomes in evaluating organizational performance. One of those enablers is Knowledge Management (KM, which is gaining increasing attentions nowadays regarding the soaring significance of knowledge resources. In order to evaluate the KM processes, a comprehensive model is required, which should be able to capture all aspects of KM. One of such models is Knowledge Management Assessment Tool (KMAT. This research is an effort to find the relationship between knowledge and business excellence through system dynamics tool. In other words, this research exploits system dynamics in order to measure the effects of KM on business excellence using a dynamic model based upon a combination of KMAT and EFQM.

  15. Integrated Management System Incorporating Quality Management and Management of Environment, Health and Occupational Safety

    International Nuclear Information System (INIS)

    Manchev, B.; Nenkova, B.; Tomov, E.

    2012-01-01

    Risk Engineering Ltd is a Bulgarian private company founded in 1990 to provide engineering and consulting services applicable to each and every field of the energy sector. Since its establishment Risk Engineering Ltd develops, implement and apply a System for quality assurance, certified for the first time by BVQI (now Bureau Veritas Certification) in 1999 for conformity with the standard ISO 9001:1994. Later on, in connection with the revision of the standards of ISO 9000 series and introduction of the standard ISO 9001:2000 a Quality Management System in conformity with the standard ISO 9001:2000 was developed, introduced and certified. At present, Risk Engineering Ltd has got developed, documented, introduced and certified by Lloyd's Register Quality Assurance (LRQA) Quality Management System in compliance with ISO 9001:2008 on the process approach basis. On this basis and including the requirements of the ISO 14001:2004 (regarding the environment) and OHSAS 18001:2007 (regarding the health and occupational safety), Risk Engineering Ltd has developed and introduced Integrated Management System aim at achieving and demonstrating good results regarding protection of the environment, health and occupational safety. The processes under control by the Integrated Management System and applicable at the company are divided in two general types: A) Management processes: Strategic management and Management of the human resources. B) Processes describing the main activities: design/development process; project management; management of industrial projects and technical infrastructure project; construction, installation, repair and operation of power industry facilities; commercial activities and marketing; investigation of energy efficiency of industrial systems and certification of buildings regarding energy efficiency; consulting activity in the field of industry and energy as well as consultant in accordance with the Law of the Spatial Planning; management of the

  16. Knowledge-based systems for power management

    Science.gov (United States)

    Lollar, L. F.

    1992-01-01

    NASA-Marshall's Electrical Power Branch has undertaken the development of expert systems in support of further advancements in electrical power system automation. Attention is given to the features (1) of the Fault Recovery and Management Expert System, (2) a resource scheduler or Master of Automated Expert Scheduling Through Resource Orchestration, and (3) an adaptive load-priority manager, or Load Priority List Management System. The characteristics of an advisory battery manager for the Hubble Space Telescope, designated the 'nickel-hydrogen expert system', are also noted.

  17. CEFR information management system solution

    International Nuclear Information System (INIS)

    Lu Fei; Zhao Jia'ning

    2011-01-01

    Based on finished information resources planning scheme for China sodium cooled experimental fast breeder reactor and the advanced information resources management solution concepts were applied, we got the building solution of CEFR information management systems. At the same time, the technical solutions of systems structures, logic structures, physical structures, development platforms and operation platforms for information resources management system in fast breeder reactors were developed, which provided programmatic introductions for development works in future. (authors)

  18. Management control system description

    Energy Technology Data Exchange (ETDEWEB)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  19. OCRWM [Office of Civilian Radioactive Waste Management] System Engineering Management Plant (SEMP)

    International Nuclear Information System (INIS)

    1990-02-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM (1) to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, (2) to develop the waste-management system, can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  20. DOE Office of Civilian Radioactive Waste Management (OCRWM) system studies digest

    International Nuclear Information System (INIS)

    McLeod, N.B.; Nguyen, T.D.; Drexelius, R.; McKee, R.W.

    1992-06-01

    The Department of Energy (DOE) Office of Civilian Radioactive Waste Management (OCRWM) has sponsored system studies to support the evaluation of alternative configurations and operations for the Civilian Radioactive Waste Management System (CRWMS) and the development of system requirements and design specifications. These studies are generally directed toward evaluating the impacts of alternatives to the monitored retrievable storage (MRS) and fuel rod consolidation, waste form and characteristics sequences, cask and canister concepts, allocation of waste acceptance rights, and system throughput rates. The objectives of this document are: To present major system issues and related system element issues in a structured manner; to discuss key results of major system studies and explain the basis for certain current system assumptions; to summarize the scope and results of completed system studies that are still relevant at the time this document is published; and to provide the background needed for identifying and prioritizing system issues to be resolved. Consistent with the objectives, the document does not include low-level subsystem studies addressing system element issues that do not interact with overall system issues. The document is expected to be updated as major new system studies are completed and significant new results are available

  1. Tank waste remediation system systems engineering management plan

    International Nuclear Information System (INIS)

    Peck, L.G.

    1998-01-01

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance

  2. Occupational health management system: A study of expatriate construction professionals.

    Science.gov (United States)

    Chan, I Y S; Leung, M Y; Liu, A M M

    2016-08-01

    systems view of health management. Copyright © 2015 Elsevier Ltd. All rights reserved.

  3. Improvement of management systems for nuclear facilities

    International Nuclear Information System (INIS)

    2005-01-01

    The area of Quality Management/ Quality Assurance has been changed dramatically over the past years. The nuclear facilities moved from the 'traditional' Quality Assurance approach towards Quality Management Systems, and later a new concept of Integrated Management Systems was introduced. The IAEA is developing a new set of Standards on Integrated Management Systems, which will replace the current 50-C-Q/SG-Q1-Q14 Code. The new set of document will require the integration of all management areas into one coherent management system. The new set of standards on Management Systems promotes the concept of the Integrated Management Systems. Based on new set a big number of documents are under preparation. These documents will address the current issues in the management systems area, e.g. Management of Change, Continuous Improvement, Self-assessment, and Attributes of effective management, etc. Currently NPES is providing a number of TC projects and Extra Budgetary Programmes to assist Member States in this area. The new Standards on Management Systems will be published in 2006. A number of Regulatory bodies already indicated that they would take the new Management System Standards as a basis for the national regulation. This fact will motivate a considerable change in the management of nuclear utilities, requiring a new approach. This activity is suitable for all IAEA Members States with large or limited nuclear capabilities. The service is directed to provide assistance for the management of all organizations carrying on or regulating nuclear activities and facilities

  4. Planning and Resource Management in an Intelligent Automated Power Management System

    Science.gov (United States)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  5. Power production operations management : due diligence and emergency planning. The due diligence - management system connection : an operating managers guide

    International Nuclear Information System (INIS)

    Kelly, J.

    1998-01-01

    Steps taken by BC Hydro in implementing a company-wide emergency management system (EMS) were described. The driving force behind the implementation of the EMS were related to the business, namely: (1) to improve business and environmental performance, (2) to provide employees with the skills and tools to make the right decisions, (3) to retain and attract customers, (4) to build relations with regulators, NGOs and the public, and (5) to prove due diligence. This presentation focused on the due diligence component of the EMS. 1 fig

  6. Energy Management of Smart Distribution Systems

    Science.gov (United States)

    Ansari, Bananeh

    Electric power distribution systems interface the end-users of electricity with the power grid. Traditional distribution systems are operated in a centralized fashion with the distribution system owner or operator being the only decision maker. The management and control architecture of distribution systems needs to gradually transform to accommodate the emerging smart grid technologies, distributed energy resources, and active electricity end-users or prosumers. The content of this document concerns with developing multi-task multi-objective energy management schemes for: 1) commercial/large residential prosumers, and 2) distribution system operator of a smart distribution system. The first part of this document describes a method of distributed energy management of multiple commercial/ large residential prosumers. These prosumers not only consume electricity, but also generate electricity using their roof-top solar photovoltaics systems. When photovoltaics generation is larger than local consumption, excess electricity will be fed into the distribution system, creating a voltage rise along the feeder. Distribution system operator cannot tolerate a significant voltage rise. ES can help the prosumers manage their electricity exchanges with the distribution system such that minimal voltage fluctuation occurs. The proposed distributed energy management scheme sizes and schedules each prosumer's ES to reduce the electricity bill and mitigate voltage rise along the feeder. The second part of this document focuses on emergency energy management and resilience assessment of a distribution system. The developed emergency energy management system uses available resources and redundancy to restore the distribution system's functionality fully or partially. The success of the restoration maneuver depends on how resilient the distribution system is. Engineering resilience terminology is used to evaluate the resilience of distribution system. The proposed emergency energy

  7. Illegal fishing and territorial user rights in Chile.

    Science.gov (United States)

    Oyanedel, Rodrigo; Keim, Andres; Castilla, Juan Carlos; Gelcich, Stefan

    2017-11-07

    Illegal fishing poses a major threat to conservation of marine resources worldwide. However, there is still limited empirical research that quantifies illegal catch levels. We used the randomized response technique to estimate the proportion of divers and the quantities of loco (Concholepas concholepas) they extracted illegally. Loco have been managed for the past 17 years through a territorial user rights for fisheries system (TURFs) in Chile. Illegal fishing of loco was widespread within the TURFs system. Official reported landings (i.e., legal landings) accounted for 14-30% of the total loco extraction. Our estimates suggest that ignoring the magnitude of illegal fishing and considering only official landing statistics may lead to false conclusions about the status and trends of a TURFs managed fishery. We found evidence of fisher associations authorizing their members to poach inside TURFs, highlighting the need to design TURFs systems so that government agencies and fishers' incentives and objectives align through continuous adaptation. Government support for enforcement is a key element for the TURFs system to secure the rights that are in place. © 2017 Society for Conservation Biology.

  8. Management information systems. [United Kingdom

    Energy Technology Data Exchange (ETDEWEB)

    Hartley, D.; Spence, A.C.

    1985-02-01

    The successful application in the United Kingdom of the real time monitoring and control systems (MINOS) for underground mining operations, particularly in coal transport and the development of coalface monitoring (FIDO) in 1980 led naturally to the design of an operational data base for management. A User Group of experienced colliery managers produced a Management Information System (MIS) requirements specification and began the evolution of the systems of today. Twenty-four mines operate MIS in different ways from total dependency to a means of checking their manual reporting system. MIS collects useful data from all the major MINOS applications and provides a means of manually inputting other, relevant information. A wide variety of displays and reports are available to management, adjusted to meet individual requirements. The benefits from the use of MIS are difficult to quantify, since they become part of the management process. Further developments are taking place based on operational experience and requirements and taking advantage of the recent advances in computer technology. MIS is the modern management tool in British coal mining, collecting, storing, analysing and presenting accurate information upon which management decision making is based.

  9. Operational Management System for Regulated Water Systems

    Science.gov (United States)

    van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.

    2012-04-01

    Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.

  10. A multi-echelon supply chain model for municipal solid waste management system.

    Science.gov (United States)

    Zhang, Yimei; Huang, Guo He; He, Li

    2014-02-01

    In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. INTEGRATIVE AUGMENTATION OF STANDARDIZED MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav Karapetrovic

    2008-03-01

    Full Text Available The development, features and integrating abilities of different international standards related to management systems are discussed. A group of such standards that augment the performance of quality management systems in organizations is specifically focused on. The concept, characteristics and an illustrative example of one augmenting standard, namely ISO 10001, are addressed. Integration of standardized augmenting systems, both by themselves and within the overall management system, is examined. It is argued that, in research and practice alike, integrative augmentation represents the future of standardized quality and other management systems.

  12. Configuration Management File Manager Developed for Numerical Propulsion System Simulation

    Science.gov (United States)

    Follen, Gregory J.

    1997-01-01

    One of the objectives of the High Performance Computing and Communication Project's (HPCCP) Numerical Propulsion System Simulation (NPSS) is to provide a common and consistent way to manage applications, data, and engine simulations. The NPSS Configuration Management (CM) File Manager integrated with the Common Desktop Environment (CDE) window management system provides a common look and feel for the configuration management of data, applications, and engine simulations for U.S. engine companies. In addition, CM File Manager provides tools to manage a simulation. Features include managing input files, output files, textual notes, and any other material normally associated with simulation. The CM File Manager includes a generic configuration management Application Program Interface (API) that can be adapted for the configuration management repositories of any U.S. engine company.

  13. Right Care for the Right Patient Each and Every Time.

    Science.gov (United States)

    Basavatia, Amar; Fret, Jose; Lukaj, Alex; Kuo, Hsiang; Yaparpalvi, Ravindra; Tome, Wolfgang A; Kalnicki, Shalom

    2016-02-12

    To implement a biometric patient identification system in the field of radiation oncology. A biometric system using palm vein scanning technology has been implemented to ensure the delivery of treatment to the correct patient each and every time. By interfacing a palm vein biometrics system (PVBS) (PatientSecure®, Imprivata, Lexington, Massachusetts) with the radiation oncology patient management system (ROPMS) (ARIA®, Varian Medical Systems, Palo Alto, California) one can integrate patient check-in at the front desk and identify and open the correct treatment record of the patient at the point of care prior to the initiation of the radiation therapy treatment. The learning time for the use of the software and palm scanner was extremely short. The staff at the front desk and treatment machines learned the procedures to use, clean, and care for the device in one hour's time. The first key to the success of the system is to have a policy and procedure in place; such a procedure was created and put in place in the department from the first day. The second key to the success is the actual hand placement on the scanner. Learning the proper placement and gently reminding patients from time to time was found to be efficient and to work well. The use of a biometric patient identification system employing palm vein technology allows one to ensure that the right care is delivered to the right patient each and every time. Documentation through the PVBS database now exists to show that this has taken place.

  14. Managing geometric information with a data base management system

    Science.gov (United States)

    Dube, R. P.

    1984-01-01

    The strategies for managing computer based geometry are described. The computer model of geometry is the basis for communication, manipulation, and analysis of shape information. The research on integrated programs for aerospace-vehicle design (IPAD) focuses on the use of data base management system (DBMS) technology to manage engineering/manufacturing data. The objectives of IPAD is to develop a computer based engineering complex which automates the storage, management, protection, and retrieval of engineering data. In particular, this facility must manage geometry information as well as associated data. The approach taken on the IPAD project to achieve this objective is discussed. Geometry management in current systems and the approach taken in the early IPAD prototypes are examined.

  15. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M ampersand O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [''Program'' refers to the CRWMS-wide activity and ''project'' refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project

  16. FEATURES OF LOGISTIC SYSTEM ADAPTIVE MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Natalya VOZNENKO

    2015-08-01

    Full Text Available The study presents literature survey on enterprise logistic system adaptive management place and structure in the general enterprise management system. The theoretical basics of logistic system functioning, levels of its management and its effectiveness had been investigated. The role of adaptive management and its types had been scrutinized. The necessity of creating company’s adaptive regulator such as its economic mechanism had been proved.

  17. Construction of test-bed system of voltage management system to ...

    African Journals Online (AJOL)

    Construction of test-bed system of voltage management system to apply physical power system. ... Journal of Fundamental and Applied Sciences ... system of voltage management system (VMS) in order to apply physical power system.

  18. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  19. Recording information on protein complexes in an information management system.

    Science.gov (United States)

    Savitsky, Marc; Diprose, Jonathan M; Morris, Chris; Griffiths, Susanne L; Daniel, Edward; Lin, Bill; Daenke, Susan; Bishop, Benjamin; Siebold, Christian; Wilson, Keith S; Blake, Richard; Stuart, David I; Esnouf, Robert M

    2011-08-01

    The Protein Information Management System (PiMS) is a laboratory information management system (LIMS) designed for use with the production of proteins in a research environment. The software is distributed under the CCP4 licence, and so is available free of charge to academic laboratories. Like most LIMS, the underlying PiMS data model originally had no support for protein-protein complexes. To support the SPINE2-Complexes project the developers have extended PiMS to meet these requirements. The modifications to PiMS, described here, include data model changes, additional protocols, some user interface changes and functionality to detect when an experiment may have formed a complex. Example data are shown for the production of a crystal of a protein complex. Integration with SPINE2-Complexes Target Tracker application is also described. Copyright © 2011 Elsevier Inc. All rights reserved.

  20. 23 CFR 972.204 - Management systems requirements.

    Science.gov (United States)

    2010-04-01

    ... to operate and maintain the management systems and their associated databases; and (5) A process for... analyses and coordination of all management system outputs to systematically operate, maintain, and upgrade...) The management systems shall be operated so investment decisions based on management system outputs...

  1. The decommissioning information management system

    International Nuclear Information System (INIS)

    Park, Seung-Kook; Moon, Jei-Kwon

    2015-01-01

    At the Korea Atomic Energy Research Institute (KAERI), the Korea Research Reactor (KRR-2) and one uranium conversion plant (UCP) were decommissioned. A project was launched in 1997, for the decommissioning of KRR-2 reactor with the goal of completion by 2008. Another project for the decommissioning of the UCP was launched in 2001. The physical dismantling works were started in August 2003 and the entire project was completed by the end of 2010. KAERI has developed a computer information system, named DECOMMIS, for an information management with an increased effectiveness for decommissioning projects and for record keeping for the future decommissioning projects. This decommissioning information system consists of three sub-systems; code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites to minimize the time gap between the dismantling activities and the evaluation of the data by the project staff. The DDPS provides useful information to the staff for more effective project management and this information includes several fields, such as project progress management, man power management, waste management, and radiation dose control of workers and so on. The DECOMMIS was applied to the decommissioning projects of the KRR-2 and the UCP, and was utilized to give information to the staff for making decisions regarding the progress of projects. It is also to prepare the reference data for the R and D program which is for the development of the decommissioning engineering system tools and to maintain the decommissioning data for the next projects. In this paper, the overall system will be explained and the several examples of its utilization, focused on waste management and manpower control, will be introduced. (author)

  2. Analysis of a monthly auction for financial transmission rights and flow-gate rights

    International Nuclear Information System (INIS)

    Biskas, P.N.; Ziogos, N.P.; Bakirtzis, A.G.

    2007-01-01

    A monthly transmission rights (TR) auction issuing both point-to-point financial transmission rights (FTRs) and flow-gate rights (FGRs) is studied in this paper. Initially, a locational marginal pricing (LMP) based energy market is presented, in which the linear security constrained optimal power flow (SCOPF) problem is solved for each hour of system operation, determining the nodal prices, the transmission link capacity prices and the transmission congestion charges (TCCs) that should be collected by the ISO in case of congestion. A monthly auction is conducted in the TR market issuing FTR obligations, FTR options and FGRs to market players, building a link between all types of transmission rights under the same market structure. Combining the advantages of financial and physical rights, the market efficiency can be enhanced by offering a variety of choices for risk management to market players. The monthly TR auction is tested on several case studies using the IEEE three-area RTS96 and useful conclusions are drawn concerning the utility of the various types of transmission rights as compared to one another, in terms of the reimbursement they provide to their holders. (author)

  3. LCA of Solid Waste Management Systems

    DEFF Research Database (Denmark)

    Bakas, Ioannis; Laurent, Alexis; Clavreul, Julie

    2018-01-01

    The chapter explores the application of LCA to solid waste management systems through the review of published studies on the subject. The environmental implications of choices involved in the modelling setup of waste management systems are increasingly in the spotlight, due to public health...... concerns and new legislation addressing the impacts from managing our waste. The application of LCA to solid waste management systems, sometimes called “waste LCA”, is distinctive in that system boundaries are rigorously defined to exclude all life cycle stages except from the end-of-life. Moreover...... LCA on solid waste systems....

  4. Audit Information Management System

    Data.gov (United States)

    US Agency for International Development — USAID/OIG has initiated its new Audit Information Management System (AIMS) to track OIG's audit recommendations and USAID's management decisions. OIG's in-house...

  5. FoodCASE: A system to manage food composition, consumption and TDS data.

    Science.gov (United States)

    Presser, Karl; Weber, David; Norrie, Moira

    2018-01-01

    Food and nutrition scientists, nowadays, need to manage an increasing amount of data regarding food composition, food consumption and Total Diet Studies (TDS). The corresponding datasets can contain information about several thousand different foods, in different versions from different studies. FoodCASE is a system that has been developed to manage these different datasets. It also support flexible means of linking between datasets and generally provide support for the different processes involved in the acquisition, management and processing of data. In this paper, the most important concepts to implement existing guidelines and standards for proper food data management are presented, as well as different use cases of data import and proofs of concepts demonstrating the ability to manage data in FoodCASE. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. Access to justice in the Convention on Rights system

    NARCIS (Netherlands)

    Gerards, J.H.; Glas, L.R.

    2017-01-01

    The numerous reforms to the Convention system of the past two decades have unquestionably had an effect on applicants’ means to access justice in the system. It is, however, open to question how these changes should be evaluated: with reference to the individual right to petition, or with reference

  7. JAX Colony Management System (JCMS): an extensible colony and phenotype data management system

    OpenAIRE

    Donnelly, Chuck J.; McFarland, Mike; Ames, Abigail; Sundberg, Beth; Springer, Dave; Blauth, Peter; Bult, Carol J.

    2010-01-01

    The Jackson Laboratory Colony Management System (JCMS) is a software application for managing data and information related to research mouse colonies, associated biospecimens, and experimental protocols. JCMS runs directly on computers that run one of the PC Windows® operating systems, but can be accessed via web browser interfaces from any computer running a Windows, Macintosh®, or Linux® operating system. JCMS can be configured for a single user or multiple users in small- to medium-size wo...

  8. HTML5, DIGITAL RIGHTS MANAGEMENT (DRM, AND THE RHETORIC OF OPENNESS

    Directory of Open Access Journals (Sweden)

    Michael S. Daubs

    2017-01-01

    Full Text Available This paper traces linkages between the commoditisation of the Web and “app-centric media”, an environment composed of a multitude of concrete-but-connected software applications. Within this environment, multiplatform HTML5 apps are often framed as the antithesis of Apple’s iOS and Google/Android “siloed” mobile app platforms, but this rhetoric of openness masks corporate involvement in the development of HTML5 and the commoditisation of the very protocols used to build the Web. To illustrate this process, this paper examines one new element of HTML5 that was hotly debated: the inclusion of digital rights management (DRM protocols. Proponents of DRM in HTML5 argued it would increase overall interoperability while balancing the rights of content creators, providers and users. This paper argues, however, that it instead essentially legitimises U.S.-centric copyright protections on a global scale and allows the future development of the Web to be dominated by a select group of media institutions.

  9. The quality management system applied at PRPN

    International Nuclear Information System (INIS)

    Benar Bukit

    2007-01-01

    The ISO 9001-2000 is an International standard for quality management systems. The application of this quality management system is for guaranteeing that the organizations products will fulfill requirements set by its customers. Here the steps taken to apply the quality management system at PRPN are expounded in five main parts, namely quality management system, responsibilities of the management, resources, product realization, measurement, analysis and repair. (author)

  10. Work flow management systems applied in nuclear power plants management system to a new computer platform

    International Nuclear Information System (INIS)

    Rodriguez Lorite, M.; Martin Lopez-Suevos, C.

    1996-01-01

    Activities performed in most companies are based on the flow of information between their different departments and personnel. Most of this information is on paper (delivery notes, invoices, reports, etc). The percentage of information transmitted electronically (electronic transactions, spread sheets, files from word processors, etc) is usually low. The implementation of systems to control and speed up this work flow is the aim of work flow management systems. This article presents a prototype for applying work flow management systems to a specific area: the basic life cycle of a purchase order in a nuclear power plant, which requires the involvement of various computer applications: purchase order management, warehouse management, accounting, etc. Once implemented, work flow management systems allow optimisation of the execution of different tasks included in the managed life cycles and provide parameters to, if necessary, control work cycles, allowing their temporary or definitive modification. (Author)

  11. Environmental management of pipeline and right-of-way; Gerenciamento ambiental em servicos de manutencao de dutos e faixas de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Torres, Carlos A.R.; Alves, Anibal J.C.; Chaves, Claudia J.M.M.; Campos, Cleber L.S.; Guarda, Juliana G.S.; Magalhaes, Milton P; Neto, Nilo M.C. [TRANSPETRO - PETROBRAS Transporte, Rio de Janeiro, RJ (Brazil); Yogui, Regiane T.T. [Bureau Veritas do Brasil, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    This paper presents the environmental management experience of TRANSPETRO in the State of Sao Paulo, Brazil, in maintenance services on pipelines and pipeline right-of-way areas, focusing on the requirements of these services in order to ensure the integrity of the system and on the limitations in connection with a great number of authorizations and governmental agencies involved and the use of the environmental management as a solution. These services include, basically, replacement of pipeline sections, geotechnical and upgrading services in right-of-way areas in a pipeline network of about 3700 km, implemented in a wide range of environments, from urban areas to environmentally protected areas. In the first place, consideration is given to the complex legal question related to the various laws and the necessity to obtain approvals such as licenses, authorizations, awards and statements of commitment pertaining to the great number of governmental agencies involved. Subsequently, the main environmental impacts pertaining to said services are approached, with presentation of the tools used in Environmental Management, such as analysis of environmental hazards and aspects, contractual requirements, plans, guideline sheets, procedures, training and monitoring. At the end, a description is presented of the difficulties met, of the solutions adopted and of the new attitudes that are required for a continuous improvement of the process. (author)

  12. Management systems for service providers

    International Nuclear Information System (INIS)

    Bolokonya, Herbert Chiwalo

    2015-02-01

    In the field of radiation safety and protection there are a number of institutions that are involved in achieving different goals and strategies. These strategies and objectives are achieved based on a number of tools and systems, one of these tools and systems is the use of a management system. This study aimed at reviewing the management system concept for Technical Service Providers in the field of radiation safety and protection. The main focus was on personal monitoring services provided by personal dosimetry laboratories. A number of key issues were found to be prominent to make the management system efficient. These are laboratory accreditation, approval; having a customer driven operating criteria; and controlling of records and good reporting. (au)

  13. Integrating Process Management with Archival Management Systems: Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Gordon Daines, III

    2009-03-01

    Full Text Available The Integrated Digital Special Collections (INDI system is a prototype of a database-driven, Web application designed to automate and manage archival workflow for large institutions and consortia. This article discusses the how the INDI project enabled the successful implementation of a process to manage large technology projects in the Harold B. Lee Library at Brigham Young University. It highlights how the scope of these technology projects is set and how the major deliverables for each project are defined. The article also talks about how the INDI system followed the process and still failed to be completed. It examines why the process itself is successful and why the INDI project failed. It further underscores the importance of process management in archival management systems.

  14. 15 CFR 995.25 - Quality management system.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Quality management system. 995.25... § 995.25 Quality management system. (a) Quality management system for CEVADs. (1) CEVAD shall operate a quality management system, based on ISO 9001-2000 or equivalent, which embraces all elements of the...

  15. Device configuration-management system

    International Nuclear Information System (INIS)

    Nowell, D.M.

    1981-01-01

    The Fusion Chamber System, a major component of the Magnetic Fusion Test Facility, contains several hundred devices which report status to the Supervisory Control and Diagnostic System for control and monitoring purposes. To manage the large number of diversity of devices represented, a device configuration management system was required and developed. Key components of this software tool include the MFTF Data Base; a configuration editor; and a tree structure defining the relationships between the subsystem devices. This paper will describe how the configuration system easily accomodates recognizing new devices, restructuring existing devices, and modifying device profile information

  16. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Jaerventausta, P; Verho, P; Kaerenlampi, M; Pitkaenen, M [Tampere Univ. of Technology (Finland); Partanen, J [Lappeenranta Univ. of Technology (Finland)

    1998-08-01

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion to the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. Nowadays the SCADA is the main computer system (and often the only) in the control center. However, the information displayed by the SCADA is often inadequate, and several tasks cannot be solved by a conventional SCADA system. A need for new computer applications in control center arises from the insufficiency of the SCADA and some other trends. The latter means that the overall importance of the distribution networks is increasing. The slowing down of load-growth has often made network reinforcements unprofitable. Thus the existing network must be operated more efficiently. At the same time larger distribution areas are for economical reasons being monitored at one control center and the size of the operation staff is decreasing. The quality of supply requirements are also becoming stricter. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the

  17. An Evaluation of Multiple Perceptions of Digital Rights Management

    Science.gov (United States)

    Stott, Allyn D.; Taneja, Aakash

    Digital Rights Management (DRM) solutions have generated much interest because of their influence on the expectations and responsibilities of customers and related organizations. It was created to restrict piracy and enhance digital media sales, however, it is found to be unable to fulfill its objectives. We find the protections by DRM lack an understanding of the end user and the evolving nature of copyright and fair use. The potential motives for pirating appear to increase as DRM becomes more intrusive causing a conflict in the objectives of DRM. Thus, adjustments must be made to the current DRM model in order for it to become beneficial for both the producer and the consumer. Our research identifies the needs, desires, and responsibilities of the various DRM stakeholders so that a successful use of DRM technologies can be modeled: a challenge faced by the media industry.

  18. JAX Colony Management System (JCMS): an extensible colony and phenotype data management system.

    Science.gov (United States)

    Donnelly, Chuck J; McFarland, Mike; Ames, Abigail; Sundberg, Beth; Springer, Dave; Blauth, Peter; Bult, Carol J

    2010-04-01

    The Jackson Laboratory Colony Management System (JCMS) is a software application for managing data and information related to research mouse colonies, associated biospecimens, and experimental protocols. JCMS runs directly on computers that run one of the PC Windows operating systems, but can be accessed via web browser interfaces from any computer running a Windows, Macintosh, or Linux operating system. JCMS can be configured for a single user or multiple users in small- to medium-size work groups. The target audience for JCMS includes laboratory technicians, animal colony managers, and principal investigators. The application provides operational support for colony management and experimental workflows, sample and data tracking through transaction-based data entry forms, and date-driven work reports. Flexible query forms allow researchers to retrieve database records based on user-defined criteria. Recent advances in handheld computers with integrated barcode readers, middleware technologies, web browsers, and wireless networks add to the utility of JCMS by allowing real-time access to the database from any networked computer.

  19. Integrated Computer System of Management in Logistics

    Science.gov (United States)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  20. Y-12 Integrated Materials Management System

    Energy Technology Data Exchange (ETDEWEB)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-06-03

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.

  1. Y-12 Integrated Materials Management System

    International Nuclear Information System (INIS)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-01-01

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclear material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system

  2. Public participation and water use rights | King | Potchefstroom ...

    African Journals Online (AJOL)

    The conservation and protection of water resources is paramount in the ... a result of mining and industrial activities), and poor resource management. To aggravate this situation, the difficulties in effectively implementing the NWA are exacerbated ... rights; integrated environmental authorisations; One Environmental System; ...

  3. Implementing Management Systems-Based Assessments

    International Nuclear Information System (INIS)

    Campisi, John A.; Reese, Robert T.

    1999-01-01

    A management system approach for evaluating environment, safety, health, and quality is in use at Sandia National Laboratories (SNL). Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy under contract DE-AC04-94AL85000. As a multi-program national laboratory, SNL has many diverse operations including research, engineering development and applications, production, and central services supporting all activities and operations. Basic research examples include fusion power generation, nuclear reactor experiments, and investigation of combustion processes. Engineering development examples are design, testing, and prototype developments of micro-mechanical systems for safe'arding computer systems, air bags for automobiles, satellite systems, design of transportation systems for nuclear materials, and systems for use in medical applications such as diagnostics and surgery. Production operations include manufacture of instrumented detection devices, radioisotopes, and replacement parts for previously produced engineered systems. Support services include facilities engineering, construction, and site management, site security, packaging and transportation of hazardous materials wastes, ES ampersand H functional programs to establish requirements and guidance to comply with federal, state, local, and contractual requirements and work safety. In this diverse environment, unlike more traditional single function business units, an integrated consistent management system is not typical. Instead, each type of diverse activity has its own management system designed and distributed around the operations, personnel, customers, and facilities (e.g., hazards involved, security, regulatory requirements, and locations). Laboratory managers are not likely to have experience in the more traditional hierarchical or command and control structures and thus do not share oversight expectations found in

  4. Implementing Management Systems-Based Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Campisi, John A.; Reese, Robert T.

    1999-05-03

    A management system approach for evaluating environment, safety, health, and quality is in use at Sandia National Laboratories (SNL). Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy under contract DE-AC04-94AL85000. As a multi-program national laboratory, SNL has many diverse operations including research, engineering development and applications, production, and central services supporting all activities and operations. Basic research examples include fusion power generation, nuclear reactor experiments, and investigation of combustion processes. Engineering development examples are design, testing, and prototype developments of micro-mechanical systems for safe'~arding computer systems, air bags for automobiles, satellite systems, design of transportation systems for nuclear materials, and systems for use in medical applications such as diagnostics and surgery. Production operations include manufacture of instrumented detection devices, radioisotopes, and replacement parts for previously produced engineered systems. Support services include facilities engineering, construction, and site management, site security, packaging and transportation of hazardous materials wastes, ES&H functional programs to establish requirements and guidance to comply with federal, state, local, and contractual requirements and work safety. In this diverse environment, unlike more traditional single function business units, an integrated consistent management system is not typical. Instead, each type of diverse activity has its own management system designed and distributed around the operations, personnel, customers, and facilities (e.g., hazards involved, security, regulatory requirements, and locations). Laboratory managers are not likely to have experience in the more traditional hierarchical or command and control structures and thus do not share oversight expectations found in

  5. FORMATION OF THE ENTERPRISE COSTS MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Borysiuk Iryna

    2018-01-01

    Full Text Available Introduction. The paper deals with the actual issues of formation of the enterprise management system costs, because in the conditions of an unstable market environment the financial performance depends on the efficiency of the cost management system, competitiveness, financial sustainability and investment attractiveness of any subject of economic activity. Purpose of the article is consolidation of approaches to cost management, theoretical substantiation and development of recommendations regarding the formation of the enterprise cost management system. Results. Development of an enterprise cost management system based on research on the essence and cost management approaches. The goals, tasks, principles, methods, tools, functions and main elements of the cost management system were determined, factors of the external and internal environment of the enterprise, that affect the system of its costs management. Conclusions. Formation of integrated cost management system ensures the successful company operation on the market, production of competitive products based on costs and prices optimization and making a profit, increase of the reasonableness of making managerial decisions.

  6. Predictors of attitude and intention to use knowledge management system among Korean nurses.

    Science.gov (United States)

    Yun, Eun Kyoung

    2013-12-01

    Knowledge sharing using Knowledge Management (KM) systems helps nurses to understand and acquire appropriate knowledge that influences the quality of healthcare service. The purpose of this study was to identify organizational and individual factors influencing attitude and intention to use KM systems among Korean nurses. A cross-sectional survey design was used to study a sample of 245 nurses employed at five hospitals in Seoul. A multiple hierarchical regression was used to examine predictors of nurses' attitude and intention to use. From an individual perspective, nurse's informatics competency was identified as a significant factor influencing attitudes toward knowledge management usage within adhocracy and clan cultures. However, from an organizational perspective, level of hospital information system was identified as a significant factor influencing KM system usage within adhocracy cultures. The findings of this study will be helpful in better understanding and assessing the impact of the factors affecting the implementation of nursing knowledge management systems and in further developing successful managerial strategies using knowledge resources in healthcare settings. Copyright © 2013 Elsevier Ltd. All rights reserved.

  7. Energy management systems in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lush, D. M.

    1979-07-01

    An investigation is made of the range of possibilities available from three types of systems (automatic control devices, building envelope, and the occupants) in buildings. The following subjects are discussed: general (buildings, design and personnel); new buildings (envelope, designers, energy and load calculations, plant design, general design parameters); existing buildings (conservation measures, general energy management, air conditioned buildings, industrial buildings); man and motivation (general, energy management and documentation, maintenance, motivation); automatic energy management systems (thermostatic controls, optimized plant start up, air conditioned and industrial buildings, building automatic systems). (MCW)

  8. The importance of management information systems in a managed care environment.

    Science.gov (United States)

    Porro, M R; Brill, K R

    1995-06-01

    Keys to successful information systems for home care providers are planning and control. With managed care's emphasis on data, agencies need to have information systems that can handle the demands managed care puts on agencies today--planning before hurrying to install a system will ensure control as the managed care contracts add up.

  9. Strategic plan to optimize the management of right-of-way parcel and utility information at FDOT : [research summary].

    Science.gov (United States)

    2013-05-01

    The Florida Department of Transportation (FDOT) manages more than 12,000 centerline-miles of highway that run through hundreds of jurisdictions. The right-of-way (ROW) that these roads are built on is a massive and complex resource in its own right a...

  10. Underground risk management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Matsuyama, S.; Inoue, M.; Sakai, T.

    2006-03-15

    JCOAL has conducted Joint Research on an Underground Communication and Risk Management Information System with CSIRO of Australia under a commissioned study project for the promotion of coal use starting in fiscal 2002. The goal of this research project is the establishment of a new Safety System focusing on the comprehensive risk management information system by the name of Nexsys. The main components of the system are the Ethernet type underground communication system that represents the data communication base, and the risk management information system that permits risk analysis in real-time and provides decision support based on the collected data. The Nexsys is an open system and is a core element of the underground monitoring system. Using a vast amount of underground data, it is capable of accommodating a wide range of functions that were not available in the past. Because of it, it is possible to construct an advanced underground safety system. 14 figs., 4 tabs.

  11. Knowledge management: processes and systems | Igbinovia ...

    African Journals Online (AJOL)

    Knowledge management: processes and systems. ... Information Impact: Journal of Information and Knowledge Management ... observation, role reversal technique, and discussion forums as well as the forms of knowledge representation to include report writing, database management system and institutional repositories.

  12. Environmental management: A system approach

    Science.gov (United States)

    Petak, William J.

    1981-05-01

    This paper presents a system framework whose purpose is to improve understanding of environmental management. By analyzing the links between elements of the environmental management system, it is possible to construct a model that aids thinking systematically about the decision-making subsystem, and other subsystems, of the entire environmental management system. Through a multidisciplinary environmental approach, each of the individual subsystems is able to adapt to threats and opportunities. The fields of government, market economics, social responsibility and ecology, for example, are so complex that it is extremely difficult to develop a framework that gives full consideration to all aspects. This paper, through the application of a highly idealized system framework, attempts to show the general relationships that exist between complex system elements.

  13. Right main bronchial fracture resolution by digital thoracic drainage system.

    Science.gov (United States)

    Cortés Julián, Gildardo; Mier, José M; Iñiguez, Marco A; Guzmán de Alba, Enrique

    2016-03-01

    Tracheobronchial stenosis is common in the thoracic surgery service, and iatrogenic injury of the airway after manipulation is not infrequent. When a digital thoracic drainage system came onto the market, many advantages were evident. A 24-year-old woman with critical right main bronchial stenosis underwent airway dilation that was complicated by a tear with a massive air leak, resulting in a total right pneumothorax. We employed a pleural drain connected to a digital thoracic drainage system. The drain was removed 2 days after successful resolution of the air leak. © The Author(s) 2015.

  14. Right-of-way management: A key to controlling the spread of cogograss (Imperata cylindrica)

    Science.gov (United States)

    W.H. Faircloth; M.G. Patterson; James H. Miller; D.H. Teem

    2004-01-01

    Cogongrass [Imperata cylindrica(L.) Beauv.] is an undesired species on highway rights-of-way (ROWS) due to its displacenent of native and/or more manageable grasses, unsightly growth characteristic, and propensity for fire. Fire not only poses a danger to motorists but could cause property loss to adjoining landowners. Most importantly, ROWS provide...

  15. Integrated Services Management System (ISMS): A management and decision making tool

    Energy Technology Data Exchange (ETDEWEB)

    Barber, D.S.; Brockman, D.L.; Buxton, L.D. [and others

    1995-10-01

    This document provides information concerning the Integrated Services Management System (ISMS) that was developed for the Laboratories Services Division during the period February 1994 through May 1995. ISMS was developed as a formal method for centralized management of programs within the Division. With minor modifications, this system can be adapted for management of all overhead functions at SNL or for sector level program management. Included in this document are the reasons for the creation of this system as well as the resulting benefits. The ISMS consists of six interlinked processes; Issues Management, Task/Activity Planning, Work Decision, Commitment Management, Process/Project Management, and Performance Assessment. Those processes are described in detail within this document. Additionally, lessons learned and suggestions for future improvements are indicated.

  16. Searching your site's management information systems

    International Nuclear Information System (INIS)

    Marquez, W.; Rollin, C.

    1994-01-01

    The Department of Energy's guidelines for the Baseline Environmental Management Report (BEMR) encourage the use of existing data when compiling information. Specific systems mentioned include the Progress Tracking System, the Mixed-Waste Inventory Report, the Waste Management Information System, DOE 4700.1-related systems, Programmatic Environmental Impact Statement (PEIS) data, and existing Work Breakdown Structures. In addition to these DOE-Headquarters tracking and reporting systems, there are a number of site systems that will be relied upon to produce the BEMR, including: (1) site management control and cost tracking systems; (2) commitment/issues tracking systems; (3) program-specific internal tracking systems; (4) Site material/equipment inventory systems. New requirements have often prompted the creation of new, customized tracking systems. This is a very time and money consuming process. As the BEMR Management Plan emphasizes, an effort should be made to use the information in existing tracking systems. Because of the wealth of information currently available from in-place systems, development of a new tracking system should be a last resort

  17. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    OpenAIRE

    Osmo Kauppila; Janne Härkönen; Seppo Väyrynen

    2015-01-01

    The integration of health and safety, environmental and quality (HSEQ) management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS), and a case study of an industry...

  18. INTEGRATED HSEQ MANAGEMENT SYSTEMS: DEVELOPMENTS AND TRENDS

    Directory of Open Access Journals (Sweden)

    Osmo Kauppila

    2015-06-01

    Full Text Available The integration of health and safety, environmental and quality (HSEQ management systems has become a current topic in the 21st century, as the need for systems thinking has grown along with the number of management system standards. This study aims to map current developments and trends in integrated HSEQ management. Three viewpoints are taken: the current state of the main HSEQ management standards, research literature on integrated management systems (IMS, and a case study of an industry-led HSEQ cluster in Northern Finland. The results demonstrate that some of the most prominent current trends are the harmonization of the high level structure of management systems by ISO, the evaluation of IMS, accounting for the supply chain in HSEQ issues, and sustainability and risk management. The results of the study can be used by practitioners to get a view of the current state of HSEQ management systems and their integration, and by researchers to seek out potential directions for HSEQ and IMS related research.

  19. Design of Knowledge Management System for Diabetic Complication Diseases

    Science.gov (United States)

    Fiarni, Cut

    2017-01-01

    This paper examines how to develop a Model for Knowledge Management System (KMS) for diabetes complication diseases. People with diabetes have a higher risk of developing a series of serious health problems. Each patient has different condition that could lead to different disease and health problem. But, with the right information, patient could have early detection so the health risk could be minimized and avoided. Hence, the objective of this research is to propose a conceptual framework that integrates social network model, Knowledge Management activities, and content based reasoning (CBR) for designing such a diabetes health and complication disease KMS. The framework indicates that the critical knowledge management activities are in the process to find similar case and the index table for algorithm to fit the framework for the social media. With this framework, KMS developers can work with healthcare provider to easily identify the suitable IT associated with the CBR process when developing a diabetes KMS.

  20. Software And Systems Engineering Risk Management

    Science.gov (United States)

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  1. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  2. Database management system for large container inspection system

    International Nuclear Information System (INIS)

    Gao Wenhuan; Li Zheng; Kang Kejun; Song Binshan; Liu Fang

    1998-01-01

    Large Container Inspection System (LCIS) based on radiation imaging technology is a powerful tool for the Customs to check the contents inside a large container without opening it. The author has discussed a database application system, as a part of Signal and Image System (SIS), for the LCIS. The basic requirements analysis was done first. Then the selections of computer hardware, operating system, and database management system were made according to the technology and market products circumstance. Based on the above considerations, a database application system with central management and distributed operation features has been implemented

  3. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  4. Car insurance information management system

    OpenAIRE

    Sun, Yu

    2015-01-01

    A customer information system is a typical information management system. It involves three aspects, the backstage database establishment, the application development and the system maintenance. A car insurance information management system is based on browser/server structure. Microsoft SQL Server establishes the backstage database. Active Server Pages, from Microsoft as well is used as the interface layer. The objective of this thesis was to apply ASP to the dynamic storage of a web page...

  5. HTR-10 management information system

    International Nuclear Information System (INIS)

    Liu Ruoxiao; Wu Zhongwang; Xi Shuren

    2000-01-01

    The HTR-10 Management information system (REMIS) strengthens the managerial level and usage of the information of HTR-10, thereby enhances the ability and efficiency of the design and management work. REMIS is designed based on the Client/Server framework. Database management system is SQL Server 6.5 for NT, While the client side is developed by Borland C ++ Builder, and it is based on Windows 95/98. The network protocol is TCP/IP. REMIS collects date of the HTR-10 at four parameters: Reactor properties, Design parameters, Equipment properties Reactor system flow charts. Final discussing extended prospect of REMIS

  6. The CMS workload management system

    Energy Technology Data Exchange (ETDEWEB)

    Cinquilli, M. [CERN; Evans, D. [Fermilab; Foulkes, S. [Fermilab; Hufnagel, D. [Fermilab; Mascheroni, M. [CERN; Norman, M. [UC, San Diego; Maxa, Z. [Caltech; Melo, A. [Vanderbilt U.; Metson, S. [Bristol U.; Riahi, H. [INFN, Perugia; Ryu, S. [Fermilab; Spiga, D. [CERN; Vaandering, E. [Fermilab; Wakefield, Stuart [Imperial Coll., London; Wilkinson, R. [Caltech

    2012-01-01

    CMS has started the process of rolling out a new workload management system. This system is currently used for reprocessing and Monte Carlo production with tests under way using it for user analysis. It was decided to combine, as much as possible, the production/processing, analysis and T0 codebases so as to reduce duplicated functionality and make best use of limited developer and testing resources. This system now includes central request submission and management (Request Manager), a task queue for parcelling up and distributing work (WorkQueue) and agents which process requests by interfacing with disparate batch and storage resources (WMAgent).

  7. The CMS workload management system

    International Nuclear Information System (INIS)

    Cinquilli, M; Mascheroni, M; Spiga, D; Evans, D; Foulkes, S; Hufnagel, D; Ryu, S; Vaandering, E; Norman, M; Maxa, Z; Wilkinson, R; Melo, A; Metson, S; Riahi, H; Wakefield, S

    2012-01-01

    CMS has started the process of rolling out a new workload management system. This system is currently used for reprocessing and Monte Carlo production with tests under way using it for user analysis. It was decided to combine, as much as possible, the production/processing, analysis and T0 codebases so as to reduce duplicated functionality and make best use of limited developer and testing resources. This system now includes central request submission and management (Request Manager); a task queue for parcelling up and distributing work (WorkQueue) and agents which process requests by interfacing with disparate batch and storage resources (WMAgent).

  8. General survey of technology management

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Yong Ha; Jang Dong Hun; Lee, In Woo

    1999-02-15

    The content of this book are technology and management, conception of technology management, feature and model of technology management system, elements of technology management, performance measurement of technology management, connectivity between technology and business function, system management of technology, manpower management, readership and technology management, motivation and technology management, management of technical investment evaluation, new item development and marketing, product liability management, intellectual property rights and transfer of technology.

  9. General survey of technology management

    International Nuclear Information System (INIS)

    Shin, Yong Ha; Jang Dong Hun; Lee, In Woo

    1999-02-01

    The content of this book are technology and management, conception of technology management, feature and model of technology management system, elements of technology management, performance measurement of technology management, connectivity between technology and business function, system management of technology, manpower management, readership and technology management, motivation and technology management, management of technical investment evaluation, new item development and marketing, product liability management, intellectual property rights and transfer of technology.

  10. Radiation management computer system for Monju

    International Nuclear Information System (INIS)

    Aoyama, Kei; Yasutomo, Katsumi; Sudou, Takayuki; Yamashita, Masahiro; Hayata, Kenichi; Ueda, Hajime; Hosokawa, Hideo

    2002-01-01

    Radiation management of nuclear power research institutes, nuclear power stations and other such facilities are strictly managed under Japanese laws and management policies. Recently, the momentous issues of more accurate radiation dose management and increased work efficiency has been discussed. Up to now, Fuji Electric Company has supplied a large number of Radiation Management Systems to nuclear power stations and related nuclear facilities. We introduce the new radiation management computer system with adopted WWW technique for Japan Nuclear Cycle Development Institute, MONJU Fast Breeder Reactor (MONJU). (author)

  11. Transport concept of new waste management system (inner packaging system)

    International Nuclear Information System (INIS)

    Hakozaki, K.; Wada, R.

    2004-01-01

    Kobe Steel, Ltd. (KSL) and Transnuclear Tokyo (TNT) have jointly developed a new waste management system concept (called ''Inner packaging system'') for high dose rate wastes generated from nuclear power plants under cooperation with Tokyo Electric Power Company (TEPCO). The inner packaging system is designed as a total management system dedicated to the wastes from nuclear plants in Japan, covering from the wastes conditioning in power plants up to the disposal in final repository. This paper presents the new waste management system concept

  12. Waste Management System Description Document (WMSD)

    International Nuclear Information System (INIS)

    1992-02-01

    This report is an appendix of the ''Waste Management Description Project, Revision 1''. This appendix is about the interim approach for the technical baseline of the waste management system. It describes the documentation and regulations of the waste management system requirements and description. (MB)

  13. Identification of the recommended waste management systems and system development schedules: Regional Management Plan

    International Nuclear Information System (INIS)

    1986-01-01

    This report describes the evaluations of alternatives for low-level waste treatment and disposal leading to the selection of four disposal methods and two treatment alternatives (including the alternative of only continuing current methods of waste treatment used by the waste generators) that were used to form candidate waste management systems. The subsequent evaluation of waste management systems and schedules for the development of the regional waste management system under four different scenarios are also included. The report also describes the consequences to the member states and their waste generators of the four scenarios and presents insights into preferred courses of action that arise from the scheduling exercise. 13 refs., 14 figs., 2 tabs

  14. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  15. Environmental management systems and organizational change

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg

    2000-01-01

    and environmental management systems. The structure of the organizations has changed, the relationships with external partners have strengthened and the implementation of quality and environmental management systems has trimmed the organizations to manage and develop these areas. The organization analysis is based......The establishment of an environmental management system and its continuous improvements is a process towards a reduction of the companies' and the products' environmental impact. The organizations' ability to change is crucial in order to establish a dynamic environmental management system...... and to achieve continuous environmental improvements. The study of changes gives an insight into how organizations function, as well as their forces and barriers. This article focuses on the organizational changes that two companies have undergone from 1992 up until today in connection with their quality...

  16. A system for managing information at ATLAS

    International Nuclear Information System (INIS)

    Tilbrook, I.R.

    1993-01-01

    In response to a need for better management of maintenance and document information at the Argonne Tandem-Linear Accelerating System (ATLAS), the ATLAS Information Management System (AIMS) has been created. The system is based on the relational database model. The system's applications use the Alpha-4 relational database management system, a commercially available software package. The system's function and design are described

  17. Quality management systems in radiology

    Directory of Open Access Journals (Sweden)

    Geoffrey K. Korir

    2013-08-01

    Objective: To assess the level of quality management systems in X-ray medical facilities in Kenya. Methods: Quality management inspection, quality control performance tests and patient radiation exposure were assessed in 54 representative X-ray medical facilities. Additionally, a survey of X-ray examination frequency was conducted in 140 hospitals across the country. Results: The overall findings placed the country’s X-ray imaging quality management systems at 61±3% out of a possible 100%. The most and the least quality assurance performance indicators were general radiography X-ray equipment quality control tests at 88±4%, and the interventional cardiology adult examinations below diagnostic reference level at 25±1%, respectively. Conclusions: The study used a systematic evidence-based approach for the assessment of national quality management systems in radiological practice in clinical application, technical conduct of the procedure, image quality criteria, and patient characteristics as part of the quality management programme.

  18. Blunt rupture of the right hemidiaphragm with herniation of the right colon and right lobe of the liver

    Directory of Open Access Journals (Sweden)

    Bairagi Anjana

    2010-01-01

    Full Text Available Acute right hemidiaphragm rupture with abdominal visceral herniation is reportedly less common than on the left. We present a complex case of blunt rupture of the right hemidiaphragm with herniation of the right colon and right lobe of the liver in a multiply injured patient. The diagnostic approach, with specific reference to the imaging studies, and surgical management is discussed, followed by a brief literature review highlighting the complexities of the case.

  19. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  20. Assessing waste management systems using reginalt software

    International Nuclear Information System (INIS)

    Meshkov, N.K.; Camasta, S.F.; Gilbert, T.L.

    1988-03-01

    A method for assessing management systems for low-level radioactive waste is being developed for US Department of Energy. The method is based on benefit-cost-risk analysis. Waste management is broken down into its component steps, which are generation, treatment, packaging, storage, transportation, and disposal. Several different alternatives available for each waste management step are described. A particular waste management system consists of a feasible combination of alternatives for each step. Selecting an optimal waste management system would generally proceed as follows: (1) qualitative considerations are used to narrow down the choice of waste management system alternatives to a manageable number; (2) the costs and risks for each of these system alternatives are evaluated; (3) the number of alternatives is further reduced by eliminating alternatives with similar risks but higher costs, or those with similar costs but higher risks; (4) a trade-off factor between cost and risk is chosen and used to compute the objective function (sum of the cost and risk); and (5) the selection of the optimal waste management system among the remaining alternatives is made by choosing the alternative with the smallest value for the objective function. The authors propose that the REGINALT software system, developed by EG and G Idaho, Inc., as an acid for managers of low-level commerical waste, be augmented for application to the managment of DOE-generated waste. Specific recommendations for modification of the REGINALT system are made. 51 refs., 3 figs., 2 tabs

  1. The role of social values in the management of ecological systems.

    Science.gov (United States)

    Ives, Christopher D; Kendal, Dave

    2014-11-01

    The concept of value is central to the practice and science of ecological management and conservation. There is a well-developed body of theory and evidence that explores concepts of value in different ways across different disciplines including philosophy, economics, sociology and psychology. Insight from these disciplines provides a robust and sophisticated platform for considering the role of social values in ecological conservation, management and research. This paper reviews theories of value from these disciplines and discusses practical tools and instruments that can be utilised by researchers and practitioners. A distinction is highlighted between underlying values that shape people's perception of the world (e.g. altruistic or biospheric value orientations), and the values that people assign to things in the world (e.g. natural heritage, money). Evidence from numerous studies has shown that there are multiple pathways between these values and attitudes, beliefs and behaviours relevant to ecological management and conservation. In an age of increasing anthropogenic impacts on natural systems, recognising how and why people value different aspects of ecological systems can allow ecological managers to act to minimise conflict between stakeholders and promote the social acceptability of management activities. A series of practical guidelines are provided to enable social values to be better considered in ecosystem management and research. Copyright © 2014 Elsevier Ltd. All rights reserved.

  2. Employee reactions to the use of management control systems in hospitals: motivation vs. threat.

    Science.gov (United States)

    Lopez-Valeiras, Ernesto; Gomez-Conde, Jacobo; Lunkes, Rogerio Joao

    Management control systems (such as budgets or balanced scorecards) are formal procedures used by managers to promote employee behavior aligned with organisational objectives. Employees may react to these control systems by either becoming more motivated or perceiving them as a threat. The aim of this paper is to determine the extent to which hospital ownership (public or private), professional group (physician, nurse, pharmacist or administrative employee), type of contract (fixed or temporary), gender and tenure can condition employee reaction to management control systems. We conducted the study in the three largest hospitals in the State of Santa Catarina (Brazil), two public (federal and state-owned) and one private (non-profit organisation). Physicians, nurses, pharmacists and administrative employees received a questionnaire between October 2013 and January 2014 concerning their current perceptions. We obtained 100 valid responses and conducted an ANOVA variance analysis. Our results show that the effect of management control systems on employees differs according to hospital ownership, professional group and type of contract. However, no significant evidence was found concerning gender or tenure. The results obtained contribute to creating specific knowledge on the reactions of employees to the use of management control systems in hospitals. This information may be important in adapting management control systems to the characteristics of the hospital and its employees, which may in turn contribute to reducing dysfunctional worker behavior. Copyright © 2017 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  3. System of Enterprise Reputation Management

    Directory of Open Access Journals (Sweden)

    Derevianko Olena. H.

    2014-03-01

    Full Text Available The article offers a system of enterprise reputation management directed at increase of economic benefits from formation and maintenance of high reputation in the result of maximisation of the volume of the incoming cash flows of the enterprise and also their duration and stability. It proves that reputation management, which allows achievement of economic goals of the enterprise, should be directed at key groups of stakeholders: growth of products sales is ensured by consumers, growth of internal stability – by enterprise personnel, growth of external stability – by society, including authority bodies, growth of business value – by investors, owners and partners. The article describes components of the system of enterprise reputation management, the degree of development of which are determined by three vectors: interaction with stakeholders and level of their feedback: messaging, informing, convincing and attracting; activity of the used instruments of reputation management, regularity and intensity, and also quantitative indicators of their application within the framework of directions of the product PR, corporate PR and IR, internal PR, GR and PR-CSR; level of organisational pre-requisites (functional, system and strategic of the system of reputation management.

  4. Auditing of environmental management system

    Directory of Open Access Journals (Sweden)

    Čuchranová Katarína

    2001-12-01

    Full Text Available Environmental auditing has estabilished itself as a valueable instrument to verify and help to improve the environmental performance.Organizations of all kinds may have a need to demonstrate the environmental responsibility. The concept of environmental management systems and the associated practice of environmental auditing have been advanced as one way to satisfy this need.These system are intended to help an organization to establish and continue to meet its environmental policies, objectives, standards and other requirements.Environmental auditing is a systematic and documented verification process of objectively obtaining and evaluating audit evidence to determine whether an organizations environmental management system conforms to the environmental management system audit criteria set by the organization and for the communication of the results of this process to the management.The following article intercepts all parts of preparation environmental auditing.The audit programme and procedures should cover the activities and areas to be considered in audits, the frequency of audits, the responsibilities associated with managing and conducting audits, the communication of audit results, auditor competence, and how audits will be conducted.The International Standard ISO 140011 estabilishes the audit procedures that determine conformance with EMS audit criteria.

  5. 76 FR 8992 - National Trails System Act and Railroad Rights-of-Way

    Science.gov (United States)

    2011-02-16

    ...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION... procedures regarding the use of railroad rights-of-way for railbanking and interim trail use under the National Trails System Act (Trails Act). DATES: Comments are due by April 12, 2011; replies are due by May...

  6. Management Information Systems

    Directory of Open Access Journals (Sweden)

    Furduescu Bogdan-Alexandru

    2017-12-01

    Full Text Available Technology is the science that studies processes, methods and operations run or applied onto raw materials, matters or data, in order to obtain a certain product. Information is the material signal able to launch a material reaction of a dynamic auto-tuning system for which the system is conditioned and finalized. Information Technology is the technology needed for handling (procuring, processing, storing converting and transmitting information, in particular, with the use of computers [Longley, D. & Shain, M. (1985, p. 164]. The importance of IT in the economic growth and development is widely known, taking into account the impact that technology can have on the success and survival, or the failure of the economic activity of enterprises/organizations, IT offering various management information systems (MIS, executive and feedback segments, which all have important and beneficial implications in management and control.

  7. 10 CFR 600.323 - Property management system.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Property management system. 600.323 Section 600.323 Energy....323 Property management system. The recipient's property management system must include the following... existence, current utilization, and continued need for the property. (d) A control system must be in effect...

  8. 23 CFR 973.204 - Management systems requirements.

    Science.gov (United States)

    2010-04-01

    ... system; (2) A process to operate and maintain the management systems and their associated databases; (3... may include consultation with the tribes, as appropriate. (k) The management systems shall be operated... 23 Highways 1 2010-04-01 2010-04-01 false Management systems requirements. 973.204 Section 973.204...

  9. 42 CFR 456.722 - Electronic claims management system.

    Science.gov (United States)

    2010-10-01

    ... Electronic Claims Management System for Outpatient Drug Claims § 456.722 Electronic claims management system...'s Medicaid Management Information System (MMIS) applicable to prescription drugs. (ii) Notifying the... 42 Public Health 4 2010-10-01 2010-10-01 false Electronic claims management system. 456.722...

  10. Activity Management System user reference manual. Revision 1

    International Nuclear Information System (INIS)

    Gates, T.A.; Burdick, M.B.

    1994-01-01

    The Activity Management System (AMS) was developed in response to the need for a simple-to-use, low-cost, user interface system for collecting and logging Hanford Waste Vitrification Plant Project (HWVP) activities. This system needed to run on user workstations and provide common user access to a database stored on a local network file server. Most important, users wanted a system that provided a management tool that supported their individual process for completing activities. Existing system treated the performer as a tool of the system. All AMS data is maintained in encrypted format. Users can feel confident that any activities they have entered into the database are private and that, as the originator, they retain sole control over who can see them. Once entered into the AMS database, the activities cannot be accessed by anyone other than the originator, the designated agent, or by authorized viewers who have been explicitly granted the right to look at specific activities by the originator. This user guide is intended to assist new AMS users in learning how to use the application and, after the initial learning process, will serve as an ongoing reference for experienced users in performing infrequently used functions. Online help screens provide reference to some of the key information in this manual. Additional help screens, encompassing all the applicable material in this manual, will be incorporated into future AMS revisions. A third, and most important, source of help is the AMS administrator(s). This guide describes the initial production version of AMS, which has been designated Revision 1.0

  11. The Air Program Information Management System (APIMS)

    Science.gov (United States)

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  12. Developing an electronic system to manage and track emergency medications.

    Science.gov (United States)

    Hamm, Mark W; Calabrese, Samuel V; Knoer, Scott J; Duty, Ashley M

    2018-03-01

    The development of a Web-based program to track and manage emergency medications with radio frequency identification (RFID) is described. At the Cleveland Clinic, medication kit restocking records and dispense locations were historically documented using a paper record-keeping system. The Cleveland Clinic investigated options to replace the paper-based tracking logs with a Web-based program that could track the real-time location and inventory of emergency medication kits. Vendor collaboration with a board of pharmacy (BOP) compliance inspector and pharmacy personnel resulted in the creation of a dual barcoding system using medication and pocket labels. The Web-based program was integrated with a Cleveland Clinic-developed asset tracking system using active RFID tags to give the real-time location of the medication kit. The Web-based program and the asset tracking system allowed identification of kits nearing expiration or containing recalled medications. Conversion from a paper-based system to a Web-based program began in October 2013. After 119 days, data were evaluated to assess the success of the conversion. Pharmacists spent an average of 27 minutes per day approving medication kits during the postimplementation period versus 102 minutes daily using the paper-based system, representing a 74% decrease in pharmacist time spent on this task. Prospective reports are generated monthly to allow the manager to assess the expected workload and adjust staffing for the next month. Implementation of a BOP-approved Web-based system for managing and tracking emergency medications with RFID integration decreased pharmacist review time, minimized compliance risk, and increased access to real-time data. Copyright © 2018 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  13. Ascites with right heart failure in a dog: diagnosis and management

    Directory of Open Access Journals (Sweden)

    Karlapudi Satish Kumar

    2014-09-01

    Full Text Available A female Labrador dog presented with a history of distended abdomen was subjected for clinical, physical, hemato-biochemical, eletrocardiographic, and ultrasonographic evaluations. Respiratory distress, weakness, fluid thrill on palpation of abdomen, cough, cyanotic tongue, and syncope were the significant manifestations. Elevated levels of creatine kinase, lactate dehydrogenase, alanine amino transferase, and alkaline phosphatase with normal blood urea nitrogen and creatinine were the common serum chemistry findings. Low voltage QRS complexes were the electrocardiographic abnormalities. Classical ground glass appearance of abdomen, and enlarged heart with increased sternal contact were the radiographic findings of abdomen and thorax. Ultrasonography of abdomen revealed floating viscera in the anechoic effusion with engorged and distended hepatic vasculature. 2-dimensional echocardiography revealed dilated right ventricle both on B- and M-mode. Further, insufficiency in mitral and tricuspid valves were recorded on pulsed and color flow Doppler. Hence, right heart failure due to ascites was confirmed, and the condition was successfully managed with losartas, spiranolactone, co-enzyme Q10 and tricholine citrate, and sorbitol.

  14. Management of patients with Arrhythmogenic Right Ventricular Cardiomyopathy in the Nordic countries.

    Science.gov (United States)

    Haugaa, Kristina H; Bundgaard, Henning; Edvardsen, Thor; Eschen, Ole; Gilljam, Thomas; Hansen, Jim; Jensen, Henrik Kjærulf; Platonov, Pyotr G; Svensson, Anneli; Svendsen, Jesper H

    2015-01-01

    Diagnostics of patients with arrhythmogenic right ventricular cardiomyopathy (ARVC) are complex, and based on the 2010 Task Force document including different diagnostic modalities. However, recommendations for clinical management and follow-up of patients with ARVC and their relatives are sparse. This paper aims to give a practical overview of management strategies, risk stratification, and selection of appropriate therapies for patients with ARVC and their family members. This paper summarizes follow-up and treatment strategies in ARVC patients in the Nordic countries. The author group represents cardiologists who are actively involved in the Nordic ARVC Registry which was established in 2009, and contains prospectively collected clinical data from more than 590 ARVC patients from Denmark, Norway, Sweden, and Finland. Different approaches of management and follow-up are required in patients with definite ARVC and in genetic-mutation-positive family members. Furthermore, ARVC patients with and without implantable cardioverter defibrillators (ICDs) require different follow-up strategies. Careful follow-up is required in patients with ARVC diagnosis to evaluate the need of anti-arrhythmic therapy and ICD implantation. Mutation-positive family members should be followed regularly for detection of early disease and risk stratification of ventricular arrhythmias.

  15. A qualitative evaluation of medication management services in six Minnesota health systems.

    Science.gov (United States)

    Sorensen, Todd D; Pestka, Deborah; Sorge, Lindsay A; Wallace, Margaret L; Schommer, Jon

    2016-03-01

    The initiation, establishment, and sustainability of medication management programs in six Minnesota health systems are described. Six Minnesota health systems with well-established medication management programs were invited to participate in this study: Essentia Health, Fairview Health Services, HealthPartners, Hennepin County Medical Center, Mayo Clinic, and Park Nicollet Health Services. Qualitative methods were employed by conducting group interviews with key staff from each institution who were influential in the development of medication management services within their organization. Kotter's theory of eight steps for leading organizational change served as the framework for the question guide. The interviews were audio recorded, transcribed, and analyzed for recurring and emergent themes. A total of 13 distinct themes were associated with the successful integration of medication management services across the six healthcare systems. Identified themes clustered within three stages of Kotter's model for leading organizational change: creating a climate for change, engaging and enabling the whole organization, and implementing and sustaining change. The 13 themes included (1) external influences, (2) pharmacists as an untapped resource, (3) principles and professionalism, (4) organizational culture, (5) momentum champions, (6) collaborative relationships, (7) service promotion, (8) team-based care, (9) implementation strategies, (10) overcoming challenges, (11) supportive care model process, (12) measuring and reporting results, and (13) sustainability strategies. A qualitative survey of six health systems that successfully implemented medication management services in ambulatory care clinics revealed that a supportive culture and team-based collaborative care are among the themes identified as necessary for service sustainability. Copyright © 2016 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  16. 32 CFR 34.23 - Property management system.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Property management system. 34.23 Section 34.23... Requirements Property Standards § 34.23 Property management system. The recipient's property management system... control system shall be in effect to insure adequate safeguards to prevent loss, damage, or theft of the...

  17. Disposal Site Information Management System

    International Nuclear Information System (INIS)

    Larson, R.A.; Jouse, C.A.; Esparza, V.

    1986-01-01

    An information management system for low-level waste shipped for disposal has been developed for the Nuclear Regulatory Commission (NRC). The Disposal Site Information Management System (DSIMS) was developed to provide a user friendly computerized system, accessible through NRC on a nationwide network, for persons needing information to facilitate management decisions. This system has been developed on NOMAD VP/CSS, and the data obtained from the operators of commercial disposal sites are transferred to DSIMS semiannually. Capabilities are provided in DSIMS to allow the user to select and sort data for use in analysis and reporting low-level waste. The system also provides means for describing sources and quantities of low-level waste exceeding the limits of NRC 10 CFR Part 61 Class C. Information contained in DSIMS is intended to aid in future waste projections and economic analysis for new disposal sites

  18. Measurement system as a subsystem of the quality management system

    Directory of Open Access Journals (Sweden)

    Ľubica Floreková

    2006-12-01

    Full Text Available Each measurement system and a control principle must be based on certain facts about the system behaviour (what, operation (how and structure (why. Each system is distributed into subsystems that provide an input for the next subsystem. For each system, start is important the begin, that means system characteristics, collecting of data, its hierarchy and the processes distribution.A measurement system (based on the chapter 8 of the standard ISO 9001:2000 Quality management system, requirements defines the measurement, analysis and improvement for each organization in order to present the products conformity, the quality management system conformity guarantee and for the continuously permanent improvement of effectivity, efficiency and economy of quality management system.

  19. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  20. Evaluating a Skills Management System

    International Nuclear Information System (INIS)

    Largier, A.

    2013-01-01

    In order to anticipate the large number of people due to retire in the next few years, and to optimize the workforce contribution, IRSN (Institute for radiation protection and nuclear safety) is setting up skill management. This poster presents the IRSN's skill management system. The skill management system is based on a 4 step approach: -) identifying and listing the necessary skills, -) assessing the skills available, -) defining and setting up solutions: training, recruitment, out-sourcing), and -) feedback about the efficiency of the system. It appears that it is important to take into account the way the organization considers individual ability in order to favour collective proficiency

  1. Integrated Systems Health Management for Intelligent Systems

    Science.gov (United States)

    Figueroa, Fernando; Melcher, Kevin

    2011-01-01

    The implementation of an integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive at an accurate and reliable assessment of its health. In this paper, concepts, procedures, and approaches are presented as a foundation for implementing an intelligent systems ]relevant ISHM capability. The capability stresses integration of DIaK from all elements of a system. Both ground-based (remote) and on-board ISHM capabilities are compared and contrasted. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems.

  2. Emergency management information system (EMINS)

    International Nuclear Information System (INIS)

    Desonier, L.M.

    1987-01-01

    In a time of crisis or in an emergency, a manager is required to make many decisions to facilitate the proper solution and conclusion to the emergency or crisis. In order to make these decisions, it is necessary for the manager to have correct up-to-date information on the situation, which calls for an automated information display and entry process. The information handling needs are identified in terms of data, video, and voice. Studies of existing Emergency Operations Centers and evaluations of hardware and software have been completed. The result of these studies and investigations is the design and implementation of an automated Emergency Management Information System. Not only is the system useful for Emergency Management but for any information management requirement

  3. Microcomputer Database Management Systems for Bibliographic Data.

    Science.gov (United States)

    Pollard, Richard

    1986-01-01

    Discusses criteria for evaluating microcomputer database management systems (DBMS) used for storage and retrieval of bibliographic data. Two popular types of microcomputer DBMS--file management systems and relational database management systems--are evaluated with respect to these criteria. (Author/MBR)

  4. Computerized map-based information management system for natural resource management

    Energy Technology Data Exchange (ETDEWEB)

    Miller, K.

    1995-12-01

    Federal agencies, states and resource managers have control and stewardship responsibility over a significant inventory of natural resources. A number of federal regulations require the review, protection and preservation of natural resource protection. Examples of such actions include the reauthorization of the Clean Water Act and the modification of the National Contingency Plan to incorporate the requirements of the Oil Pollution Act of 1990. To successfully preserve conserve and restore natural resources on federal reservations, and state and private lands, and to comply with Federal regulations designed to protect natural resources located on their sites, and the type of information on these resources required by environmental regulations. This paper presents an approach using a computerized, graphical information management system to catalogue and track data for the management of natural resources under Federal and state regulations, and for promoting resource conservation, preservation and restoration. The system is designed for use by Federal facility resource managers both for the day-to-day management of resources under their control, and for the longer-term management of larger initiatives, including restoration of significant or endangered resources, participation in regional stewardship efforts, and general ecosystem management. The system will be valuable for conducting natural resource baseline inventories an implementing resource management plans on lands other than those controlled by the Federal government as well. The system can provide a method for coordinating the type of natural resource information required by major federal environmental regulations--thereby providing a cost-effective means for managing natural resource information.

  5. Management Information System

    Science.gov (United States)

    1984-01-01

    New Automated Management Information Center (AMIC) employs innovative microcomputer techniques to create color charts, viewgraphs, or other data displays in a fraction of the time formerly required. Developed under Kennedy Space Center's contract by Boeing Services International Inc., Seattle, WA, AMIC can produce an entirely new informational chart in 30 minutes, or an updated chart in only five minutes. AMIC also has considerable potential as a management system for business firms.

  6. Data Management System

    Science.gov (United States)

    1997-01-01

    CENTRA 2000 Inc., a wholly owned subsidiary of Auto-trol technology, obtained permission to use software originally developed at Johnson Space Center for the Space Shuttle and early Space Station projects. To support their enormous information-handling needs, a product data management, electronic document management and work-flow system was designed. Initially, just 33 database tables comprised the original software, which was later expanded to about 100 tables. This system, now called CENTRA 2000, is designed for quick implementation and supports the engineering process from preliminary design through release-to-production. CENTRA 2000 can also handle audit histories and provides a means to ensure new information is distributed. The product has 30 production sites worldwide.

  7. Federal Emergency Management Information system (FEMIS) data management guide. Version 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, R.A.; Downing, T.R.; Gaustad, K.L.; Johnson, S.M.; Loveall, R.M.; Winters, C.

    1996-05-01

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Chemical and Biological Defense Command. The FEMIS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain the data resources in the system. Database administrators, system administrators, and general users can use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of FEMIS. This document provides a description of the relational and spatial information present in FEMIS. It describes how the data was assembled, how it is loaded, and how it is managed while the system is in operation.

  8. Managers’ Use of Multiple Management Control Systems

    DEFF Research Database (Denmark)

    Willert, Jeanette

    This dissertation addresses the topic Management Control Systems (MCS) as a Package. Many research studies investigate management and control systems individually, whereas fewer research studies take a holistic view and include a larger part of all the MCS managers use to guide and direct...... subordinates behaviour in the best interest of their companies. In the MCS literature, it is stressed that knowledge is particularly lacking about how managers design and use MCS as a package, and the effectiveness of using the MCS. This dissertation responds to this call by carrying out a large survey among...... executive managers in large companies, a survey that investigates the subject: Effective Management and Control Systems. The focus in the survey is to explore how executive management in large companies design and use their management control systems package. Further, this study is supplemented...

  9. Audit Management System

    CERN Document Server

    Alconada, Federico

    2015-01-01

    In the need of renewing their system, the Internal Audit department has given a proposal for building a new one. Taking into consideration the problems of their system they elaborated a requirement's list with the functionalities and features they were expecting from the new management system. This new system would be primarily for the use of the Internal Audit staff but it would also support the follow-up of internal audit recommendations by potentially all CERN staff members.

  10. CLASSIFICATION OF LEARNING MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Yu. B. Popova

    2016-01-01

    Full Text Available Using of information technologies and, in particular, learning management systems, increases opportunities of teachers and students in reaching their goals in education. Such systems provide learning content, help organize and monitor training, collect progress statistics and take into account the individual characteristics of each user. Currently, there is a huge inventory of both paid and free systems are physically located both on college servers and in the cloud, offering different features sets of different licensing scheme and the cost. This creates the problem of choosing the best system. This problem is partly due to the lack of comprehensive classification of such systems. Analysis of more than 30 of the most common now automated learning management systems has shown that a classification of such systems should be carried out according to certain criteria, under which the same type of system can be considered. As classification features offered by the author are: cost, functionality, modularity, keeping the customer’s requirements, the integration of content, the physical location of a system, adaptability training. Considering the learning management system within these classifications and taking into account the current trends of their development, it is possible to identify the main requirements to them: functionality, reliability, ease of use, low cost, support for SCORM standard or Tin Can API, modularity and adaptability. According to the requirements at the Software Department of FITR BNTU under the guidance of the author since 2009 take place the development, the use and continuous improvement of their own learning management system.

  11. Reclaiming deserted corridors: Rights of way as common property resources

    International Nuclear Information System (INIS)

    Brown, D.T.

    1993-01-01

    In Canada, power line transmission corridors are administered and maintained by provincial crown utilities. These corridors have fragmented natural habitats, destroyed biota, and disrupted geological and hydrologic systems. The practices used by utilities to maintain their rights-of-way tend to worsen the environmental and social context of the localities affected by the corridors. If the corridors are considered as common resources, and if co-management of these resources is undertaken involving the utilities and the communities affected by the corridors, public rights-of-way would be created which would have environmental benefits. These corridors would have a recreational potential and could be managed so as to reduce considerably the negative impacts presently generated by current right-of-way management practices. The use of local residents in this management process could ensure that the use of the corridors harmonizes with local needs. Among the obstacles to the co-management of these corridors are the badly defined policies of secondary land use, the restrictions on vegetation maintenance in utility corridors, lengthy approvals processes, and concerns about public liability. To make co-management of these corridors a reality, new policy structures and new procedures have to be developed in cooperation with the utilities and the affected communities. 14 refs., 1 fig

  12. 23 CFR 970.204 - Management systems requirements.

    Science.gov (United States)

    2010-04-01

    ... management system outputs to systematically operate, maintain, and upgrade existing transportation assets cost-effectively; (3) A description of each management system; (4) A process to operate and maintain the management systems and their associated databases; and (5) A process for data collection...

  13. Destination Information Management System for Tourist

    OpenAIRE

    Abdulhamid, Shafii Muhammad; Usman, Gana

    2014-01-01

    The use of information and communication technology in our day to day activities is now unavoidable. In tourism developments, destination information and management systems are used to guide visitors and provide information to both visitors and management of the tour sites. In this paper, information and navigation system was designed for tourists, taking some Niger state of Nigeria tourism destinations into account. The information management system was designed using Java Applet (NetBeans I...

  14. Ongoing right ventricular hemodynamics in heart failure: clinical value of measurements derived from an implantable monitoring system.

    Science.gov (United States)

    Adamson, Philip B; Magalski, Anthony; Braunschweig, Frieder; Böhm, Michael; Reynolds, Dwight; Steinhaus, David; Luby, Allyson; Linde, Cecilia; Ryden, Lars; Cremers, Bodo; Takle, Teri; Bennett, Tom

    2003-02-19

    This study examined the characteristics of continuously measured right ventricular (RV) hemodynamic information derived from an implantable hemodynamic monitor (IHM) in heart failure patients. Hemodynamic monitoring might improve the day-to-day management of patients with chronic heart failure (CHF). Little is known about the characteristics of long-term hemodynamic information in patients with CHF or how such information relates to meaningful clinical events. Thirty-two patients with CHF received a permanent RV IHM system similar to a single-lead pacemaker. Right ventricular systolic and diastolic pressures, heart rate, and pressure derivatives were continuously measured for nine months without using the data for clinical decision-making or management of patients. Data were then made available to clinical providers, and the patients were followed up for 17 months. Pressure characteristics during optimal volume, clinically determined volume-overload exacerbations, and volume depletion events were examined. The effect of IHM on hospitalizations was examined using the patients' historical controls. Long-term RV pressure measurements had either marked variability or minimal time-related changes. During 36 volume-overload events, RV systolic pressures increased by 25 +/- 4% (p < 0.05) and heart rate increased by 11 +/- 2% (p < 0.05). Pressure increases occurred in 9 of 12 events 4 +/- 2 days before the exacerbations requiring hospitalization. Hospitalizations before using IHM data for clinical management averaged 1.08 per patient year and decreased to 0.47 per patient-year (57% reduction, p < 0.01) after hemodynamic data were used. Long-term ambulatory pressure measurements from an IHM may be helpful in guiding day-to-day clinical management, with a potentially favorable impact on CHF hospitalizations.

  15. Are the right actors taking the right action? Climate change management in Finnish urban housing

    Energy Technology Data Exchange (ETDEWEB)

    Kyro, R.

    2013-03-01

    Anthropogenic climate change is one of the most severe environmental challenges facing the planet today, and it is certainly one of the most debated. The built environment is a known major culprit, and cities as consumption centers account for a large share of the world's consumption-based carbon footprint. It may well be argued that urban communities are at the very core of the climate change problem. The five individual studies included in the dissertation provide an understanding of the most significant urban activities generating GHG emissions, and the potential of different actions and actors to mitigate them. The research was conducted on three different scales addressing the issue from the viewpoint of individual city dwellers, urban housing companies, and finally, cities. For an individual city dweller, some 40% of the carbon footprint was found to derive from housing related activities, indicating a need to further study the impact of urban housing. The results on the housing company scale showed that, in the context of multi-family housing, occupant behavior has only limited influence on the overall energy consumption and consequent carbon footprint. Instead, housing managers who are responsible for the most significant source of GHG emissions, the heating system, appeared more influential. It was further discovered that housing managers' attitudes and practices differ, and that the differences affect the carbon footprint. The dissertation argues that the social constructiveness of the climate change issue should be acknowledged and considered in planning for mitigation action. More attention should be paid to the management and motivation of individuals, particularly on the housing manager and individual city dweller level. On the policy maker level, while ensuring prompt action, a vigorous attempt to establish the true effects of the action should be maintained. The research concludes that no single action or actor will suffice in mitigating

  16. Waste management - an integral part of environmental management systems

    Energy Technology Data Exchange (ETDEWEB)

    Hamm, Ulrich

    1998-12-01

    To consider waste as a resource instead of an annoyance with which the management has to cope with, has become an unavoidable task for modern managers. The task the management has to take to secure competitiveness in an environment of rising complexity of production processes and further increasing legal requirements, is to manage waste as much as other recourses are managed. Waste has to be considered an aspect of planning and decision process just as business plans or logistics are. Main themes discussed in this publication comprise waste management, implementation of waste management as an integral part of environmental management systems, and management approach to waste - the results. 4 figs.

  17. Master's Degree in Management Information Systems with a Supply Chain Management Focus

    Science.gov (United States)

    Ramaswamy, Kizhanatham V.; Boyd, Joseph L.; Desai, Mayur

    2007-01-01

    A graduate curriculum in Management Information Systems with a Supply Chain Management focus is presented. The motivation for this endeavor stems from the fact that the global scope of modern business organizations and the competitive environment in which they operate, requires an information system leveraged supply chain management system (SCM)…

  18. 48 CFR 2452.242-71 - Contract management system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract management system... 2452.242-71 Contract management system. As prescribed in 2442.1107, insert the following clause: Contract Management System (FEB 2006) (a) The contractor shall use contract management baseline planning...

  19. 20 CFR 633.311 - Management information systems.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Management information systems. 633.311... AND SEASONAL FARMWORKER PROGRAMS Program Design and Administrative Procedures § 633.311 Management information systems. All grantees shall establish and maintain a program and financial management system which...

  20. 20 CFR 632.32 - Financial management systems.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Financial management systems. 632.32 Section... Financial management systems. (a) Each Native American grantee, subgrantee and contractor shall maintain a financial management system which will provide accurate, current and complete disclosure of the financial...

  1. 23 CFR 971.204 - Management systems requirements.

    Science.gov (United States)

    2010-04-01

    ... of all management systems outputs to systematically operate, maintain, and upgrade existing transportation assets cost-effectively; (3) A description of each management system; (4) A process to operate and maintain the management systems and their associated databases; and (5) A process for data collection...

  2. Management system requirements for small reactors

    Energy Technology Data Exchange (ETDEWEB)

    Jones, K.A., E-mail: kenneth.jones@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Ottawa, Ontario (Canada)

    2013-07-01

    This abstract identifies the management system requirements for the life cycle of small reactors from initial conception through completion of decommissioning. For small reactors, the requirements for management systems remain the same as those for 'large' reactors regardless of the licensee' business model and objectives. The CSA N-Series of standards provides an interlinked set of requirements for the management of nuclear facilities. CSA N286 provides overall direction to management to develop and implement sound management practices and controls, while other CSA nuclear standards provide technical requirements and guidance that support the management system. CSA N286 is based on a set of principles. The principles are then supported by generic requirements that are applicable to the life cycle of nuclear facilities. CNSC regulatory documents provide further technical requirements and guidance. (author)

  3. Column-oriented database management systems

    OpenAIRE

    Možina, David

    2013-01-01

    In the following thesis I will present column-oriented database. Among other things, I will answer on a question why there is a need for a column-oriented database. In recent years there have been a lot of attention regarding a column-oriented database, even if the existence of a columnar database management systems dates back in the early seventies of the last century. I will compare both systems for a database management – a colum-oriented database system and a row-oriented database system ...

  4. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  5. Profitability of Management Systems on German Fenlands

    Directory of Open Access Journals (Sweden)

    Marco Rebhann

    2016-10-01

    Full Text Available Fens are organic sites that require drainage for agricultural use. Lowering the groundwater level leads to trade-offs between economic benefits and environmental impacts (i.e., CO2 and nutrient emissions. To identify management options that are both environmentally and economically sustainable, a propaedeutic systematic analysis of the costs, income and profit of different land use and management systems on fenlands is necessary. This study provides an overview of the profitability, labor demand and comparative advantages of feasible management systems on German fenlands. Twenty management practices in four land use systems are analyzed. The results indicate that most management systems are profitable only with subsidies and payments for ecosystem services. In addition to sales revenue, these payments are indispensable to promote peat-saving agricultural practices on fenlands. Regarding the labor aspect, intensive management systems caused an increase in working hours per hectare, which may positively affect employment in rural areas. The calculations obtained in this study can be used as a basis for estimations of greenhouse gas (GHG mitigation costs when management systems are associated with GHG emission values.

  6. Management issues for high performance storage systems

    Energy Technology Data Exchange (ETDEWEB)

    Louis, S. [Lawrence Livermore National Lab., CA (United States); Burris, R. [Oak Ridge National Lab., TN (United States)

    1995-03-01

    Managing distributed high-performance storage systems is complex and, although sharing common ground with traditional network and systems management, presents unique storage-related issues. Integration technologies and frameworks exist to help manage distributed network and system environments. Industry-driven consortia provide open forums where vendors and users cooperate to leverage solutions. But these new approaches to open management fall short addressing the needs of scalable, distributed storage. We discuss the motivation and requirements for storage system management (SSM) capabilities and describe how SSM manages distributed servers and storage resource objects in the High Performance Storage System (HPSS), a new storage facility for data-intensive applications and large-scale computing. Modem storage systems, such as HPSS, require many SSM capabilities, including server and resource configuration control, performance monitoring, quality of service, flexible policies, file migration, file repacking, accounting, and quotas. We present results of initial HPSS SSM development including design decisions and implementation trade-offs. We conclude with plans for follow-on work and provide storage-related recommendations for vendors and standards groups seeking enterprise-wide management solutions.

  7. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  8. The development of KAERI management information system -First year: The development of manpower information management system-

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Shin Bok; Huh, Young Hwan; Lee, Jong Bok; Park, Soo Jin; Lee, Young Jae; Park, Yeon Sik; Jang, Deok Kyu; Park, Seung Deok; Kim, Jong Myeong [Korea Atomic Energy Res. Inst., Taejon (Korea, Republic of)

    1991-12-01

    The purpose of this report is to describe the implementation of the management information system for manpower. This job is the first year`s for development KAERI management information system. It is important to properly manage a manpower to cope with the external circumstances promptly and to maximize the productivity of the organization. This report aims at basic management of manpower and uses multimedia to keep abreast with the times and introduces the concept of GUI (Graphic User Interface) to user for ease access. (Author).

  9. The development of KAERI management information system -First year: The development of manpower information management system-

    International Nuclear Information System (INIS)

    Kang, Shin Bok; Huh, Young Hwan; Lee, Jong Bok; Park, Soo Jin; Lee, Young Jae; Park, Yeon Sik; Jang, Deok Kyu; Park, Seung Deok; Kim, Jong Myeong

    1991-12-01

    The purpose of this report is to describe the implementation of the management information system for manpower. This job is the first year's for development KAERI management information system. It is important to properly manage a manpower to cope with the external circumstances promptly and to maximize the productivity of the organization. This report aims at basic management of manpower and uses multimedia to keep abreast with the times and introduces the concept of GUI (Graphic User Interface) to user for ease access. (Author)

  10. Environmental management systems: An industry viewpoint

    International Nuclear Information System (INIS)

    Ottenbreit, R.

    1993-01-01

    Imperial Oil is upgrading systems used to ensure protection of health and safety and to facilitate the internalization and integration of environmental considerations into its business. Work in progress related to this upgrading is reported. The upgrading was undertaken partly in response to increased expectations from stakeholders and from the notion that improvement of the environmental, health, and safety (EH ampersand S) aspects of business can have the effect of improving reliability, lowering expenses, and minimizing liabilities. The responsibility for establishing environmental policy and direction as well as the environmental management framework rests with Imperial Oil's management committee and the EH ampersand S committee of the board of directors. Responsibility and accountability for implementation and sustainment of environmental processes and systems resides with line management. One of the management systems, the Operations Integrity Management Framework, is described. Elements of this framework include management leadership, accountability, and commitment; risk assessment and management; management of change; personnel and training; incident investigation and analysis; and facilities design and construction. 2 figs

  11. Correspondence Management System

    Data.gov (United States)

    U.S. Environmental Protection Agency — CMS is EPA's correspondence tracking and workflow management system. It scans, logs, routes, tracks, and stores incoming and outgoing correspondence in all Program...

  12. Holdings Management System

    Data.gov (United States)

    National Archives and Records Administration — This system supports the physical management of permanent, hard-copy archival Records in the custody of National Archives and Records Administration program offices.

  13. Prevention of musculoskeletal disorders within management systems: A scoping review of practices, approaches, and techniques.

    Science.gov (United States)

    Yazdani, Amin; Neumann, W Patrick; Imbeau, Daniel; Bigelow, Philip; Pagell, Mark; Wells, Richard

    2015-11-01

    The purpose of this study was to identify and summarize the current research evidence on approaches to preventing musculoskeletal disorders (MSD) within Occupational Health and Safety Management Systems (OHSMS). Databases in business, engineering, and health and safety were searched and 718 potentially relevant publications were identified and examined for their relevance. Twenty-one papers met the selection criteria and were subjected to thematic analysis. There was very little literature describing the integration of MSD risk assessment and prevention into management systems. This lack of information may isolate MSD prevention, leading to difficulties in preventing these disorders at an organizational level. The findings of this review argue for further research to integrate MSD prevention into management systems and to evaluate the effectiveness of the approach. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  14. 7 CFR 246.13 - Financial management system.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Financial management system. 246.13 Section 246.13... State Agency Provisions § 246.13 Financial management system. (a) Disclosure of expenditures. The State agency shall maintain a financial management system which provides accurate, current and complete...

  15. 14 CFR 152.303 - Financial management system.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Financial management system. 152.303... (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.303 Financial management system. Each sponsor or planning agency shall establish and maintain a financial management system that...

  16. e-Learning Management System (eLMS) -

    Data.gov (United States)

    Department of Transportation — DOT's electronic Learning Management System (eLMS) is a state-of-the-art web-based system that meets the needs of training administrators, learners, and managers and...

  17. Verification Account Management System (VAMS)

    Data.gov (United States)

    Social Security Administration — The Verification Account Management System (VAMS) is the centralized location for maintaining SSA's verification and data exchange accounts. VAMS account management...

  18. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system

  19. Designing an oil spill information management system

    International Nuclear Information System (INIS)

    Douligeris, C.; Collins, J.; Iakovou, E.; Sun, P.; Riggs, K.R.

    1995-01-01

    This paper presents the architectural design of OSIMS, an Oil Spill Information Management System, which is an integrated information management tool that consists of an object-relational database management system, an adaptive decision support system, an advanced visualization system (AVS) and a geographic information system (GIS). OSIMS will handle large and diverse databases of environmental, ecological, geographical, engineering, and regulatory information and will be used for risk analysis and contingency planning

  20. Designing an oil spill information management system

    Energy Technology Data Exchange (ETDEWEB)

    Douligeris, C.; Collins, J.; Iakovou, E.; Sun, P.; Riggs, K.R. [Univ. of Miami, Coral Gables, FL (United States)

    1995-12-31

    This paper presents the architectural design of OSIMS, an Oil Spill Information Management System, which is an integrated information management tool that consists of an object-relational database management system, an adaptive decision support system, an advanced visualization system (AVS) and a geographic information system (GIS). OSIMS will handle large and diverse databases of environmental, ecological, geographical, engineering, and regulatory information and will be used for risk analysis and contingency planning.

  1. Model-based version management system framework

    International Nuclear Information System (INIS)

    Mehmood, W.

    2016-01-01

    In this paper we present a model-based version management system. Version Management System (VMS) a branch of software configuration management (SCM) aims to provide a controlling mechanism for evolution of software artifacts created during software development process. Controlling the evolution requires many activities to perform, such as, construction and creation of versions, identification of differences between versions, conflict detection and merging. Traditional VMS systems are file-based and consider software systems as a set of text files. File based VMS systems are not adequate for performing software configuration management activities such as, version control on software artifacts produced in earlier phases of the software life cycle. New challenges of model differencing, merge, and evolution control arise while using models as central artifact. The goal of this work is to present a generic framework model-based VMS which can be used to overcome the problem of tradition file-based VMS systems and provide model versioning services. (author)

  2. Left-Right Asymmetric Morphogenesis in the Xenopus Digestive System

    Science.gov (United States)

    Muller, Jennifer K.; Prather, D.R.; Nascone-Yoder, N. M.

    2003-01-01

    The morphogenetic mechanisms by which developing organs become left-right asymmetric entities are unknown. To investigate this issue, we compared the roles of the left and right sides of the Xenopus embryo during the development of anatomic asymmetries in the digestive system. Although both sides contribute equivalently to each of the individual digestive organs, during the initial looping of the primitive gut tube, the left side assumes concave topologies where the right side becomes convex. Of interest, the concave surfaces of the gut tube correlate with expression of the LR gene, Pitx2, and ectopic Pitx2 mRNA induces ectopic concavities in a localized manner. A morphometric comparison of the prospective concave and convex surfaces of the gut tube reveals striking disparities in their rate of elongation but no significant differences in cell proliferation. These results provide insight into the nature of symmetry-breaking morphogenetic events during left-right asymmetric organ development. ?? 2003 Wiley-Liss, Inc.

  3. Multiple system modelling of waste management

    International Nuclear Information System (INIS)

    Eriksson, Ola; Bisaillon, Mattias

    2011-01-01

    Highlights: → Linking of models will provide a more complete, correct and credible picture of the systems. → The linking procedure is easy to perform and also leads to activation of project partners. → The simulation procedure is a bit more complicated and calls for the ability to run both models. - Abstract: Due to increased environmental awareness, planning and performance of waste management has become more and more complex. Therefore waste management has early been subject to different types of modelling. Another field with long experience of modelling and systems perspective is energy systems. The two modelling traditions have developed side by side, but so far there are very few attempts to combine them. Waste management systems can be linked together with energy systems through incineration plants. The models for waste management can be modelled on a quite detailed level whereas surrounding systems are modelled in a more simplistic way. This is a problem, as previous studies have shown that assumptions on the surrounding system often tend to be important for the conclusions. In this paper it is shown how two models, one for the district heating system (MARTES) and another one for the waste management system (ORWARE), can be linked together. The strengths and weaknesses with model linking are discussed when compared to simplistic assumptions on effects in the energy and waste management systems. It is concluded that the linking of models will provide a more complete, correct and credible picture of the consequences of different simultaneous changes in the systems. The linking procedure is easy to perform and also leads to activation of project partners. However, the simulation procedure is a bit more complicated and calls for the ability to run both models.

  4. Automated Traffic Management System and Method

    Science.gov (United States)

    Glass, Brian J. (Inventor); Spirkovska, Liljana (Inventor); McDermott, William J. (Inventor); Reisman, Ronald J. (Inventor); Gibson, James (Inventor); Iverson, David L. (Inventor)

    2000-01-01

    A data management system and method that enables acquisition, integration, and management of real-time data generated at different rates, by multiple heterogeneous incompatible data sources. The system achieves this functionality by using an expert system to fuse data from a variety of airline, airport operations, ramp control, and air traffic control tower sources, to establish and update reference data values for every aircraft surface operation. The system may be configured as a real-time airport surface traffic management system (TMS) that electronically interconnects air traffic control, airline data, and airport operations data to facilitate information sharing and improve taxi queuing. In the TMS operational mode, empirical data shows substantial benefits in ramp operations for airlines, reducing departure taxi times by about one minute per aircraft in operational use, translating as $12 to $15 million per year savings to airlines at the Atlanta, Georgia airport. The data management system and method may also be used for scheduling the movement of multiple vehicles in other applications, such as marine vessels in harbors and ports, trucks or railroad cars in ports or shipping yards, and railroad cars in switching yards. Finally, the data management system and method may be used for managing containers at a shipping dock, stock on a factory floor or in a warehouse, or as a training tool for improving situational awareness of FAA tower controllers, ramp and airport operators, or commercial airline personnel in airfield surface operations.

  5. Dual-Use Aspects of System Health Management

    Science.gov (United States)

    Owens, P. R.; Jambor, B. J.; Eger, G. W.; Clark, W. A.

    1994-01-01

    System Health Management functionality is an essential part of any space launch system. Health management functionality is an integral part of mission reliability, since it is needed to verify the reliability before the mission starts. Health Management is also a key factor in life cycle cost reduction and in increasing system availability. The degree of coverage needed by the system and the degree of coverage made available at a reasonable cost are critical parameters of a successful design. These problems are not unique to the launch vehicle world. In particular, the Intelligent Vehicle Highway System, commercial aircraft systems, train systems, and many types of industrial production facilities require various degrees of system health management. In all of these applications, too, the designers must balance the benefits and costs of health management in order to optimize costs. The importance of an integrated system is emphasized. That is, we present the case for considering health management as an integral part of system design, rather than functionality to be added on at the end of the design process. The importance of maintaining the system viewpoint is discussed in making hardware and software tradeoffs and in arriving at design decisions. We describe an approach to determine the parameters to be monitored in any system health management application. This approach is based on Design of Experiments (DOE), prototyping, failure modes and effects analyses, cost modeling and discrete event simulation. The various computer-based tools that facilitate the approach are discussed. The approach described originally was used to develop a fault tolerant avionics architecture for launch vehicles that incorporated health management as an integral part of the system. Finally, we discuss generalizing the technique to apply it to other domains. Several illustrations are presented.

  6. 7 CFR 249.11 - Financial management system.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Financial management system. 249.11 Section 249.11... § 249.11 Financial management system. (a) Disclosure of expenditures. The State agency must maintain a financial management system that provides accurate, current and complete disclosure of the financial status...

  7. 7 CFR 248.11 - Financial management system.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Financial management system. 248.11 Section 248.11... § 248.11 Financial management system. (a) Disclosure of expenditures. The State agency shall maintain a financial management system which provides accurate, current and complete disclosure of the financial status...

  8. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  9. Municipal solid waste management system: decision support through systems analysis

    OpenAIRE

    Pires, Ana Lúcia Lourenço

    2010-01-01

    Thesis submitted to the Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia for the degree of Doctor of Philosophy in Environmental Engineering The present study intends to show the development of systems analysis model applied to solid waste management system, applied into AMARSUL, a solid waste management system responsible for the management of municipal solid waste produced in Setúbal peninsula, Portugal. The model developed intended to promote sustainable decision making, ...

  10. Autonomously managed electrical power systems

    Science.gov (United States)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  11. Automatic management software for large-scale cluster system

    International Nuclear Information System (INIS)

    Weng Yunjian; Chinese Academy of Sciences, Beijing; Sun Gongxing

    2007-01-01

    At present, the large-scale cluster system faces to the difficult management. For example the manager has large work load. It needs to cost much time on the management and the maintenance of large-scale cluster system. The nodes in large-scale cluster system are very easy to be chaotic. Thousands of nodes are put in big rooms so that some managers are very easy to make the confusion with machines. How do effectively carry on accurate management under the large-scale cluster system? The article introduces ELFms in the large-scale cluster system. Furthermore, it is proposed to realize the large-scale cluster system automatic management. (authors)

  12. System management model based on the design SWOT-matrix and quality management system for energy complex enterprise

    OpenAIRE

    Novikov, Vladimir

    2010-01-01

    The article deals with categorical apparatus of information management systems to build a model pairing SWOT-matrix and the quality management system, which is especially important for the energytion industry.

  13. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  14. Autonomously managed high power systems

    International Nuclear Information System (INIS)

    Weeks, D.J.; Bechtel, R.T.

    1985-01-01

    The need for autonomous power management capabilities will increase as the power levels of spacecraft increase into the multi-100 kW range. The quantity of labor intensive ground and crew support consumed by the 9 kW Skylab cannot be afforded in support of a 75-300 kW Space Station or high power earth orbital and interplanetary spacecraft. Marshall Space Flight Center is managing a program to develop necessary technologies for high power system autonomous management. To date a reference electrical power system and automation approaches have been defined. A test facility for evaluation and verification of management algorithms and hardware has been designed with the first of the three power channel capability nearing completion

  15. Information systems for risk management

    OpenAIRE

    Michael S. Gibson

    1997-01-01

    Risk management information systems are designed to overcome the problem of aggregating data across diverse trading units. The design of an information system depends on the risk measurement methodology that a firm chooses. Inherent in the design of both a risk management information system and a risk measurement methodology is a tradeoff between the accuracy of the resulting measures of risk and the burden of computing them. Technical progress will make this tradeoff more favorable over time...

  16. Place of Budget Management in the General System of Trade Enterprise Management

    OpenAIRE

    Kravchenko Olena S.; Brahina Olha S.

    2014-01-01

    The article grounds urgency of identification of the place of budget management in the general system of trade enterprise management. It analyses points of view of economists with respect to definitions of the “budgeting” and “budget management” terms. It considers main functions of budget management. It identifies the place of budget management in the general system of enterprise management. Pursuant to definition of the budget management as a managerial technology, which should meet a numbe...

  17. Hospital managers need management information systems.

    Science.gov (United States)

    Davis, S; Freeman, J R

    1976-01-01

    A new hospital director seeking to bring his institution to the brink of solvency found himself with ten pounds of data but no "information"--at least, not the kind of information he could use as a basis for management decisions. What he needed was a system that would not only present data, but the meaning of the data. Such a system is the integrated MIS.

  18. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  19. Efficiency analysis system of material management

    Directory of Open Access Journals (Sweden)

    Bogusław Śliwczyński

    2012-12-01

    Full Text Available Background: Significant scope of enterprise's efficiency management is improving of material management process both the strategic and operational level. The complexity of material flow processes can lead to a threat such as distraction and disintegration of analysis focusing on many different factors influenced on effective sourcing and procurement management, transport and warehousing processes, inventory management, working capital and cash flow management. Material and methods: The presented article focuses on multidimensional and multi-criteria analysis of material management efficiency that is considered as decision support system. Authors have presented results of the research regarding ineffective material management confirm insufficient analytical supporting in various decisions of procurement operations. Results and conclusions: Based on research results authors presented in the article model of efficiency analysis system of material management.

  20. Development of a change management system

    Science.gov (United States)

    Parks, Cathy Bonifas

    1993-01-01

    The complexity and interdependence of software on a computer system can create a situation where a solution to one problem causes failures in dependent software. In the computer industry, software problems arise and are often solved with 'quick and dirty' solutions. But in implementing these solutions, documentation about the solution or user notification of changes is often overlooked, and new problems are frequently introduced because of insufficient review or testing. These problems increase when numerous heterogeneous systems are involved. Because of this situation, a change management system plays an integral part in the maintenance of any multisystem computing environment. At the NASA Ames Advanced Computational Facility (ACF), the Online Change Management System (OCMS) was designed and developed to manage the changes being applied to its multivendor computing environment. This paper documents the research, design, and modifications that went into the development of this change management system (CMS).

  1. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  2. Deviation Management: Key Management Subsystem Driver of Knowledge-Based Continuous Improvement in the Henry Ford Production System.

    Science.gov (United States)

    Zarbo, Richard J; Copeland, Jacqueline R; Varney, Ruan C

    2017-10-01

    To develop a business subsystem fulfilling International Organization for Standardization 15189 nonconformance management regulatory standard, facilitating employee engagement in problem identification and resolution to effect quality improvement and risk mitigation. From 2012 to 2016, the integrated laboratories of the Henry Ford Health System used a quality technical team to develop and improve a management subsystem designed to identify, track, trend, and summarize nonconformances based on frequency, risk, and root cause for elimination at the level of the work. Programmatic improvements and training resulted in markedly increased documentation culminating in 71,641 deviations in 2016 classified by a taxonomy of 281 defect types into preanalytic (74.8%), analytic (23.6%), and postanalytic (1.6%) testing phases. The top 10 deviations accounted for 55,843 (78%) of the total. Deviation management is a key subsystem of managers' standard work whereby knowledge of nonconformities assists in directing corrective actions and continuous improvements that promote consistent execution and higher levels of performance. © American Society for Clinical Pathology, 2017. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com

  3. An operation management system for golf tournament

    Directory of Open Access Journals (Sweden)

    Yuan Yijun

    2017-02-01

    Full Text Available In this paper,an operation management system for golf tournament is designed to calculate the beginning and finishing dates of the preparation automatically.The efficiency of management work during preparatory period,such as meetings before match and task announcement,is raised by nearly 40% after using our system than using traditional management tools or other software systems.And the probability of occurrence of delay and omission of work are controlled within 5%.It is proved to be helpful for reducing management costs and improving efficiency of tournament management company.

  4. A rural transit asset management system

    Science.gov (United States)

    2005-01-01

    This reports the research undertaken to create an interactive, geographic information system based asset management system for the Alabama Department of Transportation to manage vehicles purchased and operated through Section 5310 and 5311 federal gr...

  5. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  6. Nuclear maintenance and management system

    International Nuclear Information System (INIS)

    Yamaji, Yoshihiro; Abe, Norihiko

    2000-01-01

    The Mitsubishi Electric Co., Ltd. has developed to introduce various computer systems for desk-top business assistance in a power plant such as system isolation assisting system, operation parameter management system, and so on under aiming at business effectiveness since these ten and some years. Recently, by further elapsed years of the plants when required for further cost reduction and together with change of business environment represented by preparation of individual personal computer, further effectiveness, preparation of the business environment, and upgrading of maintenance in power plant business have been required. Among such background, she has carried out various proposals and developments on construction of a maintenance and management system integrated the business assistant know-hows and the plant know-hows both accumulated previously. They are composed of three main points on rationalization of business management and document management in the further effectiveness, preparation of business environment, TBM maintenance, introduction of CBM maintenance and introduction of maintenance assistance in upgrading of maintenance. Here was introduced on system concepts aiming at the further effectiveness of the nuclear power plant business, preparation of business environment, upgrading of maintenance and maintenance, and so on, at a background of environment around maintenance business in the nuclear power plants (cost-down, highly elapsed year of the plant, change of business environment). (G.K)

  7. MANAGEMENT INNOVATIONS IN THE SYSTEM OF THE CRISIS MANAGEMENT OF THE ENTERPRISE

    Directory of Open Access Journals (Sweden)

    O. N. Kiseleva

    2015-01-01

    Full Text Available The problem of the use of the management innovations in the system of crisis management is considered in the article. Domestic enterprises run business in the changing environment and are forced to respond to the impact of environmental factors all the time. The crisis management system is provided this opportunity. The analysis of the practical experience proved that the innovations are the most effective tools of the crisis management at the present time. The management innovations are the primary. These innovations are the base of the "correct" anticrisis program of the enterprise. The possibilities of the budgeting system as the management innovations for each type of the crisis management are presented in the article. The role of the budgeting system for the definition of the priority directions of anticrisis measures is considered on the example of the analysis of cash flow budget. The features of the budgeting as the management innovations for each type of crisis management is presented in the article. The specific example of cash flow budget analysis proved the role of budgeting in determining the priority directions of anti-crisis measures.

  8. Double-button Fixation System for Management of Acute Acromioclavicular Joint Dislocation

    Science.gov (United States)

    Torkaman, Ali; Bagherifard, Abolfazl; Mokhatri, Tahmineh; Haghighi, Mohammad Hossein Shabanpour; Monshizadeh, Siamak; Taraz, Hamid; Hasanvand, Amin

    2016-01-01

    Background: Surgical treatments for acromioclavicular (AC) joint dislocation present with some complications. The present study was designed to evaluate the double-button fixation system in the management of acute acromioclavicular joint dislocation. Methods: This cross sectional study, done between February 2011 to June 2014, consisted of 28 patients who underwent surgical management by the double-button fixation system for acute AC joint dislocation. Age, sex, injury mechanism, dominant hand, side with injury, length of follow up, time before surgery, shoulder and hand (DASH), constant and visual analogue scale (VAS) scores, and all complications of the cases during the follow up were recorded. Results: The mean age of patients was 33.23±6.7 years. Twenty four patients (85.71%) were male and four (14.28%) were female. The significant differences were observed between pre-operation VAS, constant shoulder scores and post-operation measurements. There were not any significant differences between right and left coracoclavicular, but two cases of heterotrophic ossifications were recorded. The mean follow-up time was 16.17±4.38 months. Conclusion: According to the results, the double-button fixation system for management of acute acromioclavicular joint dislocation has suitable results and minimal damage to the soft tissues surrounding the coracoclavicular ligaments. PMID:26894217

  9. X-33/RLV System Health Management/Vehicle Health Management

    Science.gov (United States)

    Mouyos, William; Wangu, Srimal

    1998-01-01

    To reduce operations costs, Reusable Launch Vehicles (RLVS) must include highly reliable robust subsystems which are designed for simple repair access with a simplified servicing infrastructure, and which incorporate expedited decision-making about faults and anomalies. A key component for the Single Stage To Orbit (SSTO) RLV system used to meet these objectives is System Health Management (SHM). SHM incorporates Vehicle Health Management (VHM), ground processing associated with the vehicle fleet (GVHM), and Ground Infrastructure Health Management (GIHM). The primary objective of SHM is to provide an automated and paperless health decision, maintenance, and logistics system. Sanders, a Lockheed Martin Company, is leading the design, development, and integration of the SHM system for RLV and for X-33 (a sub-scale, sub-orbit Advanced Technology Demonstrator). Many critical technologies are necessary to make SHM (and more specifically VHM) practical, reliable, and cost effective. This paper will present the X-33 SHM design which forms the baseline for the RLV SHM, and it will discuss applications of advanced technologies to future RLVs. In addition, this paper will describe a Virtual Design Environment (VDE) which is being developed for RLV. This VDE will allow for system design engineering, as well as program management teams, to accurately and efficiently evaluate system designs, analyze the behavior of current systems, and predict the feasibility of making smooth and cost-efficient transitions from older technologies to newer ones. The RLV SHM design methodology will reduce program costs, decrease total program life-cycle time, and ultimately increase mission success.

  10. Unmanned Aircraft Systems Traffic Management (UTM): Conflict Mitigation Approach

    Science.gov (United States)

    Johnson, Marcus

    2018-01-01

    This is a presentation that describes the UAS Traffic Management Approach to an alternate means of compliance with 91.113 right of way regulations. UTM is an "air traffic management" ecosystem for uncontrolled operations.

  11. Information Management System for the California State Water Resources Control Board (SWRCB)

    Science.gov (United States)

    Heald, T. C.; Redmann, G. H.

    1973-01-01

    A study was made to establish the requirements for an integrated state-wide information management system for water quality control and water quality rights for the State of California. The data sources and end requirements were analyzed for the data collected and used by the numerous agencies, both State and Federal, as well as the nine Regional Boards under the jurisdiction of the State Board. The report details the data interfaces and outlines the system design. A program plan and statement of work for implementation of the project is included.

  12. Integrated management systems in the nuclear field

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.; Karapetrovic, S.V.; Willborn, W.O.

    2005-01-01

    In the last years several internationally accepted standards such as the ISO 9000 and ISO 14000 series and other function-specific management systems standards have been developed. At the same time, it has become imperative for organisations to continuously improve their overall quality, environmental and safety performance. Therefore, the need to create integrated management systems is of growing importance to enable an easier handling of the different management systems. This paper has two main objectives. The first one is to address the key issues in the underlying theory of integrated management systems including benefits and limits, the second one is to illustrate the importance of an integrated (in particular safety) management system and the experience feedback providing examples from different areas and different organisations in the nuclear field. (orig.)

  13. Manpower management information system /MIS/

    Science.gov (United States)

    Gravette, M. C.; King, W. L.

    1971-01-01

    System of programs capable of building and maintaining data bank provides all levels of management with regular manpower evaluation reports and data source for special management exercises on manpower.

  14. 76 FR 76917 - Homeless Management Information Systems Requirements

    Science.gov (United States)

    2011-12-09

    ...-P-01] Homeless Management Information Systems Requirements AGENCY: Office of the Assistant Secretary... for the establishment of regulations for Homeless Management Information Systems (HMIS), which are the... community development, Homeless, Information technology system, Management system, Nonprofit organizations...

  15. Portfolio Management System

    Data.gov (United States)

    US Agency for International Development — PfMS is an implementation of WorkLenz. WorkLenz is USAID's portfolio management system tool. It is a commercially available, off-the-shelf (COTS) package that...

  16. [The future of clinical laboratory database management system].

    Science.gov (United States)

    Kambe, M; Imidy, D; Matsubara, A; Sugimoto, Y

    1999-09-01

    To assess the present status of the clinical laboratory database management system, the difference between the Clinical Laboratory Information System and Clinical Laboratory System was explained in this study. Although three kinds of database management systems (DBMS) were shown including the relational model, tree model and network model, the relational model was found to be the best DBMS for the clinical laboratory database based on our experience and developments of some clinical laboratory expert systems. As a future clinical laboratory database management system, the IC card system connected to an automatic chemical analyzer was proposed for personal health data management and a microscope/video system was proposed for dynamic data management of leukocytes or bacteria.

  17. KNOWLEDGE MANAGEMENT SYSTEM DESIGN AT HUMAN RESOURCES DIVISION

    Directory of Open Access Journals (Sweden)

    Yanti Yanti

    2009-05-01

    Full Text Available The Human Resources Division of a company is a vital division. Most of the time, they perform their work manually, and therefore creating limitations to their capacity. The knowledge contained is very important for human resources development and subsequently for developing the company. In order to manage this knowledge well, the company shall require a knowledge management system. This knowledge management system would be a solution to be used for the company to manage all knowledge contained in that particular division. Phases in designing knowledge managements starts from analyzing knowledge sources of the company, knowledge identification and definition, and determining knowledge goals. Knowledge management systems contain many functions such as collecting, recording and managing the knowledge and sharing this to all related employees easily. The company may also use knowledge management systems to share and inform employees regarding updates of information, news and/or activity regarding the employees themselves. Information from knowledge management systems may also be used by employees to monitor their performance and thereby increasing it. Knowledge management systems may also help employees in their learning activities.Keywords: knowledge management, human resources, employee

  18. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  19. From Right place--Wrong person, to Right place--Right person: dignified care for older people.

    Science.gov (United States)

    Tadd, Win; Hillman, Alex; Calnan, Michael; Calnan, Sian; Read, Simon; Bayer, Antony

    2012-04-01

    To examine: older people's and their relatives' views of dignified care; health care practitioners' behaviours and practices in relation to dignified care; the occupational, organizational and cultural factors that impact on care; and develop evidence-based recommendations for dignified care. An ethnography of four acute trusts in England and Wales involving semi-structured interviews with recently discharged older people (n = 40), their relatives (n = 25), frontline staff (n = 79) and Trust managers (n = 32), complemented by 617 hours of non-participant observation in 16 wards in NHS trusts. 'Right Place - Wrong Person' refers to the staffs' belief that acute wards are not the 'right place' for older people. Wards were poorly-designed, confusing and inaccessible for older people; older people were bored through lack of communal spaces and activities and they expressed concern about the close proximity of patients of the opposite sex; staff were demoralised and ill-equipped with skills and knowledge to care for older people, and organizational priorities caused patients to be frequently moved within the system. In none of the wards studied was care either totally dignified or totally undignified. Variations occurred from ward to ward, in the same ward when different staff were on-duty and at different times of the day. The failure to provide dignified care is often a result of systemic and organizational factors rather than a failure of individual staff and it is these that must be addressed if dignified care is to be ensured.

  20. 48 CFR 970.5232-7 - Financial management system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Financial management... for Management and Operating Contracts 970.5232-7 Financial management system. As prescribed in 970.3270(b)(1), insert the following clause: Financial Management System (DEC 2000) The Contractor shall...

  1. The management of right iliac fossa pain - is timing everything?

    LENUS (Irish Health Repository)

    McCartan, D P

    2012-01-31

    BACKGROUND: Right iliac fossa (RIF) pain remains the commonest clinical dilemma encountered by general surgeons. We prospectively audited the management of acute RIF pain, examining the relationship between symptom duration, use of pre-operative radiological imaging and patient outcome. METHODS: Over a six-month period, 302 patients, median age 18 years, 59% female, were admitted with RIF pain. Symptoms, clinical findings and laboratory results were documented. Patient management, timing of radiological investigations and operations, and outcome were recorded prospectively. RESULTS: Non-specific abdominal pain (26%), gynaecological (22%) and miscellaneous causes (14%) accounted for most admissions. Ultimately, 119 patients (39%) had appendicitis. Anorexia, tachycardia or rebound tenderness in the RIF significantly predicted a final diagnosis of appendicitis. Patients with perforated appendicitis (n = 29) had a longer duration of pre-hospital symptoms (median 50h) compared to those with simple appendicitis (median 17 h) (p<0.001). The use of pre-operative imaging resulted in an increased time to surgery but was not associated with increased post-operative morbidity or perforated appendicitis. CONCLUSION: The majority of patients presenting to hospital with RIF pain did not have appendicitis. Increased duration of pre-hospital symptoms was the main factor associated with perforated appendicitis. However, increased in-hospital time to theatre was not associated with perforated appendicitis or post-operative morbidity.

  2. Introduction to data base management systems

    International Nuclear Information System (INIS)

    Rossiter, B.N.

    1984-01-01

    Data base management systems offer considerable advantages over elementary filing systems under favourable circumstances such as where data structures and applications are continually changing. The architecture of such systems and the manner in which they work is described, with particular attention to data independence. An introduction is made to the classification of data base management systems by the data structuring models that they employ. (orig.)

  3. Higher Mortality in Surgically Managed Diverticulitis is Associated with Asian Ethnicity and Right-Sided Disease.

    Science.gov (United States)

    Choi, Christine S; Koltun, Walter A; Hollenbeak, Christopher S

    2016-03-01

    Although right-sided diverticulitis is perceived to have a higher incidence among Asians and infrequently requires surgical management in comparison with sigmoid diverticulitis, it is unknown whether differences in outcomes are due to ethnic disparity or disease pathophysiology. The aim of this study was to determine the surgical outcomes for Asian and non-Asian patients with diverticulitis who underwent colectomy. Patients identifiable by ethnicity in the Nationwide Inpatient Sample with diverticulitis and colectomy between 2004 and 2010 were included. Univariate comparisons were made between Asian and non-Asian patients by using t tests for continuous variables and χ tests for categorical variables. Propensity score matching analysis was performed to compare Asian patients with otherwise similar non-Asian patients. Included were 58,142 non-Asian and 335 Asian patients with diverticulitis who underwent a colectomy. The primary outcomes were in-hospital mortality, hospital length of stay, and total costs. Asian patients were younger (56.1 vs. 59.2 years, p ethnicity variable was not uniformly collected by all states within the Nationwide Inpatient Sample database. Among patients undergoing a colectomy for diverticulitis, a higher mortality was observed in Asian patients and right-sided disease. Future longitudinal studies comparing the natural history and outcomes of management between right- and left-sided diverticulitis are necessary to investigate whether a true ethnic disparity exists.

  4. Evaluating safety management system implementation

    International Nuclear Information System (INIS)

    Preuss, M.

    2009-01-01

    Canada is committed to not only maintaining, but also improving upon our record of having one of the safest aviation systems in the world. The development, implementation and maintenance of safety management systems is a significant step towards improving safety performance. Canada is considered a world leader in this area and we are fully engaged in implementation. By integrating risk management systems and business practices, the aviation industry stands to gain better safety performance with less regulatory intervention. These are important steps towards improving safety and enhancing the public's confidence in the safety of Canada's aviation system. (author)

  5. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  6. Managing Space System Faults: Coalescing NASA's Views

    Science.gov (United States)

    Muirhead, Brian; Fesq, Lorraine

    2012-01-01

    Managing faults and their resultant failures is a fundamental and critical part of developing and operating aerospace systems. Yet, recent studies have shown that the engineering "discipline" required to manage faults is not widely recognized nor evenly practiced within the NASA community. Attempts to simply name this discipline in recent years has been fraught with controversy among members of the Integrated Systems Health Management (ISHM), Fault Management (FM), Fault Protection (FP), Hazard Analysis (HA), and Aborts communities. Approaches to managing space system faults typically are unique to each organization, with little commonality in the architectures, processes and practices across the industry.

  7. A new "twist" on right heart failure with left ventricular assist systems.

    Science.gov (United States)

    Houston, Brian A; Shah, Keyur B; Mehra, Mandeep R; Tedford, Ryan J

    2017-07-01

    Despite significant efforts to predict and prevent right heart failure, it remains a leading cause of morbidity and mortality after implantation of left ventricular assist systems (LVAS). In this Perspective, we review the underappreciated anatomic and physiologic principles that govern the relationship between left and right heart function and contribute to this phenomenon. This includes the importance of considering the right ventricle (RV) and pulmonary arterial circuit as a coupled system; the contribution of the left ventricle (LV) to RV contractile function and the potential negative impact of acutely unloading the LV; the influence of the pericardium and ventricular twist on septal function; the role of RV deformation in reduced mechanical efficiency after device placement; and the potential of ongoing stressors of an elevated right-sided preload. We believe an appreciation of these complex issues is required to fully understand the expression of the unique phenotypes of right heart failure after LVAS implantation and for developing better prognostic and therapeutic strategies. Copyright © 2017 International Society for the Heart and Lung Transplantation. Published by Elsevier Inc. All rights reserved.

  8. Recommendation System Based On Association Rules For Distributed E-Learning Management Systems

    Science.gov (United States)

    Mihai, Gabroveanu

    2015-09-01

    Traditional Learning Management Systems are installed on a single server where learning materials and user data are kept. To increase its performance, the Learning Management System can be installed on multiple servers; learning materials and user data could be distributed across these servers obtaining a Distributed Learning Management System. In this paper is proposed the prototype of a recommendation system based on association rules for Distributed Learning Management System. Information from LMS databases is analyzed using distributed data mining algorithms in order to extract the association rules. Then the extracted rules are used as inference rules to provide personalized recommendations. The quality of provided recommendations is improved because the rules used to make the inferences are more accurate, since these rules aggregate knowledge from all e-Learning systems included in Distributed Learning Management System.

  9. BWR reactor management system

    International Nuclear Information System (INIS)

    Makino, Kakuji; Kawamura, Atsuo; Yoshioka, Ritsuo; Neda, Toshikatsu.

    1979-01-01

    It is necessary to grasp the delicate state of operation in reactor cores in view of the control of burn-up and power output at the time of the operation management of BWRs. Enormous labor has been required for the collection, processing and evaluation of the data. It is desirable to obtain the safer, more efficient and faster method of operation control by predicting the states in cores including the change of xenon and reflecting them to operation plans as well as by tracing with high accuracy the past burn-up history for a long period. At present, the on-line evaluation of the states in cores is carried out with the process computers attached to respective units, but the amount of data required for core operation management of high degree far exceeds their capacity. From such viewpoints, the research and development on the reactor management system were carried out. The data processing concerning core operation management is performed with newly installed computers utilizing the data from existing process computers, and the operation of reactor cores, the qualitative improvement of management works, labor saving, and fast, efficient operation control are feasible with it. This system was installed in an actual plant in October, 1977. The composition of the system, the prediction of the change in local output distribution accompanying control rod operation, the prediction of the change in the states in cores due to the flow rate of coolant, and the function of collecting plant data are explained. (Kako, I.)

  10. A computerized legal information management system | Ohiagu ...

    African Journals Online (AJOL)

    A computerized legal information management system. ... process through the filling system using the survey research methodology. ... A framework for the design and implementation of a legal information management system was presented.

  11. Environmental Management Systems

    Science.gov (United States)

    This site on Environmental Management Systems (EMS) provides information and resources related to EMS for small businesses and private industry, as well as local, state and federal agencies, including all the EPA offices and laboratories.

  12. TINJUAN YURIDIS PENGATURAN RIGHTS MANAGEMENT INFORMATION DALAM KETENTUAN HAK MORAL PADA UNDANG-UNDANG NO. 19 TAHUN 2002 TENTANG HAK CIPTA DI INDONESIA

    Directory of Open Access Journals (Sweden)

    M. Zairul Alam

    2014-08-01

    Full Text Available Abstract Thedigital technological advancement and internet technology urges the new forms of  works protection against new model of piracy and copyright infringement. Technological Protection Measures (TPM and Rights Management Information (RMI seeks to answer the needs of new forms of technological protection as those provisions are regulated under WIPO Copyright Treaty 1996. This paper suggest that the RMI concept which is regulated under Moral Rights section in Indonesian Copyright Act reveals new obstacles in order to comply with adequate and effective legal remedies requirementsin WCT provision. As a conclusion, the arrangement of RMI under Moral Rights in Indonesian Copyright Act does not fit properly with the main objectives of RMI as one element of double protection of digital works along with TPM. Key words: rights management information, moral rights, technological protection Abstrak Kemajuan teknologi digital dan teknologi internet memunculkan urgensi bentuk perlindungan baru atas model pembajakann karya cipta dan pelanggaran hak cipta. TPM (Technological Protection Measures dan RMI (Rights Management Information mencoba memberikan jawaban atas kebutuhan perlindungan ciptaan dengan penggunaan teknologi sebagaimana diatur dalam WIPO Copyright Treaty 1996. Tulisan ini selanjutnya akan menjelaskan bahwa pengaturan RMI di bawah Ketentuan Hak Moral dalam Undang-Undang Hak Cipta memunculkan kendala dan tantangan baru dalam kaitannya dengan pemenuhan persyaratan akan pengaturan RMI yang memadai dan efektif. Tulisan ini berkesimpulan bahwa pengaturan RMI dalam Ketentuan Hak Moral dalam UUHC di Indonesia tidak secara tepat sesuai dengan apa yang dimaksudkan dalam WCT, bahwa baik RMI dan TPM berfungsi sebagai proteksi ganda perlindungan karya digital. Kata kunci: right management information, hak moral, perlindungan teknologi

  13. The principle of systemic integration in human rights law

    NARCIS (Netherlands)

    Rachovitsa, Adamantia

    International lawyers and courts consider the principle of systemic integration to be a potential answer to difficulties arising from the fragmentation of public international law. This article questions the application of this approach in the context of human rights treaties. It is argued, first,

  14. Searching your site`s management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Marquez, W.; Rollin, C. [S.M. Stoller Corp., Boulder, CO (United States)

    1994-12-31

    The Department of Energy`s guidelines for the Baseline Environmental Management Report (BEMR) encourage the use of existing data when compiling information. Specific systems mentioned include the Progress Tracking System, the Mixed-Waste Inventory Report, the Waste Management Information System, DOE 4700.1-related systems, Programmatic Environmental Impact Statement (PEIS) data, and existing Work Breakdown Structures. In addition to these DOE-Headquarters tracking and reporting systems, there are a number of site systems that will be relied upon to produce the BEMR, including: (1) site management control and cost tracking systems; (2) commitment/issues tracking systems; (3) program-specific internal tracking systems; (4) Site material/equipment inventory systems. New requirements have often prompted the creation of new, customized tracking systems. This is a very time and money consuming process. As the BEMR Management Plan emphasizes, an effort should be made to use the information in existing tracking systems. Because of the wealth of information currently available from in-place systems, development of a new tracking system should be a last resort.

  15. System management and quality assurance

    International Nuclear Information System (INIS)

    Sastry, A.M.

    1989-01-01

    This paper describes the principles of system management and shows the relationship to quality assurance. It discusses the need for balanced attention to all the project management controls required for project success

  16. Environmental management systems in South Africa

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Smink, Carla

    2004-01-01

    The article presents som empirical findings regarding environmental management systems of four companies in the automotive industry in South Africa.......The article presents som empirical findings regarding environmental management systems of four companies in the automotive industry in South Africa....

  17. Implementation of quality management systems: the role of hospital (management) boards.

    NARCIS (Netherlands)

    Botje, D.; Klazinga, N.S.; Suñol, R.; Wagner, C.

    2013-01-01

    Objectives: Hospitals are putting tremendous efforts in implementing evidence-based management systems and organisational innovations for patient-centred care. Having a hospital quality management system is a prerequisite to successfully implement these innovations. Previous studies showed that the

  18. Globalization and localization of Management Control Systems

    DEFF Research Database (Denmark)

    Toldbod, Thomas; Israelsen, Poul

    2014-01-01

    Through an empirical case study this article examines the operation of multiple management control systems as a package in a Danish manufacturing company. The analysis focuses on four different management control systems; cybernetic controls, planning controls, reward controls, and administrative...... have more particular characteristics. Specifically, this study finds that cybernetic controls and administrative controls are designed as global management control systems. Planning controls are glocal systems and reward & compensation controls assume local characteristics. The finding leads...... controls, through the theoretical lens of globalization, localization, and glocalization. The analysis documents that these different management control systems are affected differently by the processes of globalization and localization, whereby some are universal throughout the organization and others...

  19. Rooted Rights Systems in Turbulent Water: The Dynamics of Collective Fishing Rights in La Albufera, Valencia, Spain

    NARCIS (Netherlands)

    Boelens, R.A.; Claudin, V.

    2015-01-01

    Valencia's Albufera Lake is a wetlands area where different sociolegal systems interact. Its El Palmar community is governed by customary laws for fishing and territorial control. These exist alongside, yet in tension with, governmental laws. This article examines the dynamics of fishing rights,

  20. Rooted rights systems in turbulent waters: the dynamics of collective fishing rights in La Albufera, Valencia, Spain

    NARCIS (Netherlands)

    Boelens, R.; Claudin, V.

    2015-01-01

    Valencia's Albufera Lake is a wetlands area where different sociolegal systems interact. Its El Palmar community is governed by customary laws for fishing and territorial control. These exist alongside, yet in tension with, governmental laws. This article examines the dynamics of fishing rights,

  1. Advanced alarm management system

    International Nuclear Information System (INIS)

    Easter, J.R.

    1995-01-01

    The Westinghouse Advanced Alarm Management System (AWARE) is one of the Man-Machine Design Interfaces (MMI) which has great flexibility with regard to hardware type and configuration, alarm system concept, plant scope, engineering scope and installation. The AWARE System provides the capability to better manage the quantity prioritization and presentation of real-time process alarm messages in the control room. The messages are specific, precise and dynamic. The AWARE System can provide a large reduction in the number of messages that the control room staff must address at any one time, thus making the alarm message system a useful tool for the operators during situations that normally produce a high volume of messages as well as improving the clarity of the presentation of process abnormalities during small disturbances. The operating staff is now provided with the basis for a better understanding of the current plant state and for taking the appropriate control actions. (2 refs., 3 figs.)

  2. TFTR data management system

    International Nuclear Information System (INIS)

    Randerson, L.; Chu, J.; Ludescher, C.; Malsbury, J.; Stark, W.

    1986-01-01

    Developments in the tokamak fusion test reactor (TFTR) data management system supporting data management system supporting data acquisition and off-line physics data reduction are described. Data from monitor points, timing channels, and transient recorder channels and other devices are acquired and stored for use by on-line tasks. Files are transferred off-line automatically. A configuration utility determines data acquired and files transferred. An event system driven by file arrival activates off-line reduction processes. A post-run process transfers files not shipped during runs. Files are archived to tape and are retrievable by digraph and shot number. Automatic skimming based on most recent access, file type, shot numbers, and user-set protection maintains the files required for post-run data reduction

  3. The CMS Data Management System

    Science.gov (United States)

    Giffels, M.; Guo, Y.; Kuznetsov, V.; Magini, N.; Wildish, T.

    2014-06-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Data Booking Service (DBS), a metadata catalog; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this contribution we will discuss the use of both Oracle and NoSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  4. The CMS data management system

    International Nuclear Information System (INIS)

    Giffels, M; Magini, N; Guo, Y; Kuznetsov, V; Wildish, T

    2014-01-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Data Booking Service (DBS), a metadata catalog; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this contribution we will discuss the use of both Oracle and NoSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  5. Five paradox on energy system management

    International Nuclear Information System (INIS)

    Frisch, J.R.

    1995-01-01

    Five paradox are detailed on energy management: internationalization of energy questions but always regional management is present, short term problems must be solved but without forgetting long term problems in environment, the third paradox is : we have time but we are in a hurry, we have reserves but ten, twenty or thirty years are necessary to adapt our energy system; the fourth paradox is : we cannot manage energy by managing only energy, for example : finances system development and environment importance. The last and fifth paradox is : the market, yes, but state too, as regulative force

  6. For a Socialist Theoretical System for Human Rights with Chinese Characteristics

    Institute of Scientific and Technical Information of China (English)

    GU CHUNDE

    2011-01-01

    @@ Ⅰ.The Necessity and Feasibility for Developing a Socialist Theoretical System for Human Rights with Chinese Characteristics Development of such a system is needed to ensure success of the social transformation and transition ongoing up in China.

  7. Knowledge Management System in Health & Social Care: Review on 20 Practiced Knowledge Management

    Directory of Open Access Journals (Sweden)

    Muhammad Saiful Ridhwan

    2014-02-01

    Full Text Available The importance of managing medical information has become very critical in the healthcare delivery system. Medical information nowadays are optimized towards serving different areas such as; diagnosing of diseases, planning and administration, treatment and monitoring of patient outcomes, services and costs. This article provides a review into various Health and Social Care systems which encompasses the Knowledge Management value. For analysis, more than 30 systems that are related to Health and Social Care were gathered via Internet research, only 20 of these systems were finally selected based on recent system development and popularity of the system.Keywords: Health Care, Knowledge, Knowledge Management, Social Care, systemdoi:10.12695/ajtm.2013.6.2.4 How to cite this article:Ridhwan, M.S., and Oyefolahan, I.O. (2013. Knowledge Management System in Health & Social Care: Review on 20 Practiced Knowledge Management. The Asian Journal of Technology Management 6 (2: 92-101. Print ISSN: 1978-6956; Online ISSN: 2089-791X. doi:10.12695/ajtm.2013.6.2.4

  8. Integration of the enterprise electronic health record and anesthesia information management systems.

    Science.gov (United States)

    Springman, Scott R

    2011-09-01

    Fewer than 5% of anesthesia departments use an electronic medical record (EMR) that is anesthesia specific. Many anesthesia information management systems (AIMS) have been developed with a focus only on the unique needs of anesthesia providers, without being fully integrated into other electronic health record components of the entire enterprise medical system. To understand why anesthesia providers should embrace health information technology (HIT) on a health system-wide basis, this article reviews recent HIT history and reviews HIT concepts. The author explores current developments in efforts to expand enterprise HIT, and the pros and cons of full enterprise integration with an AIMS. Copyright © 2011 Elsevier Inc. All rights reserved.

  9. Freedom of Expression, Right to Information, Personal Data and the Internet in the view of the Inter-American System of Human Rights

    Directory of Open Access Journals (Sweden)

    Silvia Susana TOSCANO

    2017-03-01

    Full Text Available The Inter-American System of Protection of Human Rights is composed of microsystems, like the freedom of expression, the right to information and the protection of privacy and of personal data, among others. These rights interrelate and form the standards of the Inter-American system, in accordance with the UN system, to develop these liberties, and to keep the constant balance of these rights in conflict. All of this enhanced by a dynamic and growing massiveness, like the internet and by a new paradigm in which the freedom of expression and the right to information is included: a postmodern society characterized by a “democratization” of connectivity, a multidirectional transmission of the information and a dichotomy between what is public or private. Freedom of expression is developed in both of its two dimensions: individual or collective. When we talk about its individual dimension, we mean the right of each person to express his ideas, thoughts and beliefs aiming at unidirectional, bidirectional or multidirectional communication. The collective or social dimension refers to the right of a person to receive any type of information, to know the thoughts, ideas and information of others and have free access to them. Both dimensions are equally important and are interdependent, thus it is important to protect them simultaneously. New communication technologies have altered the previous system, and the individual dimension of freedom of expression breaks into public debate on the democratization of internet access and its social dimension due to the feasibility a multidirectional communication impossible to conceive in any other technological paradigm entails. The protection scheme of freedom of expression of the Inter-American System is particularly strong as it specifically prohibits prior censorship and rules sanctions and very strict restrictions in relation to discrimination, advocacy of war, violence and hatred. This characteristic

  10. Pickering tool management system

    International Nuclear Information System (INIS)

    Wong, E.H.; Green, A.H.

    1997-01-01

    Tools were being deployed in the station with no process in effect to ensure that they are maintained in good repair so as to effectively support the performance of Maintenance activities. Today's legal requirements require that all employers have a process in place to ensure that tools are maintained in a safe condition. This is specified in the Ontario Health and Safety Act. The Pickering Tool Management System has been chosen as the process at Pickering N.D to manage tools. Tools are identified by number etching and bar codes. The system is a Windows application installed on several file servers

  11. The system of management of innovative potential of economic systems

    Directory of Open Access Journals (Sweden)

    Kostyshak Mikhail

    2018-01-01

    Full Text Available The purpose of the research is to develop a mechanism for managing the innovative potential of a development organization, which is capable to ensure the transformation of real estate objects due to the changes in market needs. The main approaches to the development of innovative potential of economic systems are presented. Efficiency criteria of management of innovation potential of development organizations are formed. A model based on joint use of system and resource and potential approaches to the management of innovative potential of a development organization is formed. The analysis of modern tendencies of development of innovative potential of economic systems, based on rationalization of management of innovative potential of a development organization is conducted.

  12. School Management Information Systems in Primary Schools

    Science.gov (United States)

    Demir, Kamile

    2006-01-01

    Developments in information technologies have been impacting upon educational organizations. Principals have been using management information systems to improve the efficiency of administrative services. The aim of this research is to explore principals' perceptions about management information systems and how school management information…

  13. Research and Development Management System (RDMS)

    International Nuclear Information System (INIS)

    Mohd Azidi Abdul Rahman; Abdul Muin Abdul Rahman; Sufian Norazam Mohamed Aris; Saaidi Ismail; Mohamad Safuan Sulaiman; Maizura Ibrahim; Hazizi Omar; Roslan Mohd Ali

    2010-01-01

    Research and Development (R and D) is a main activity carried out at the Malaysian Nuclear Agency particularly in the physical science and nuclear field. The R and D activity that is carried out needs to be managed more efficiently and systematically. Until now all research management activities are carried out manually or semi electronically, beginning from filling in application forms to when the project is completed. Therefore a computerized system is needed in order to manage and monitor R and D projects. The R and D system is capable of giving access information concerning R and D projects which are carried out to users inside and outside the agency. The R and D management system (RDMS) can increase the capability of the Malaysian Nuclear Agency in managing, researching and developing, innovating and inventing technology as well as commercializing the R and D produced. (author)

  14. ENVIRONMENTAL SYSTEMS MANAGEMENT: TOWARDS A NEW SCIENCE OF SUSTAINABLE ENVIRONMENTAL MANAGEMENT

    Science.gov (United States)

    Environmental Systems Management (ESM) is the management of environmental problems at the systems level fully accounting for the multi-dimensional nature of the environment. This includes socio-economic dimensions as well as the usual physical and life science aspects of environm...

  15. XCPU2 process management system

    Energy Technology Data Exchange (ETDEWEB)

    Ionkov, Latchesar [Los Alamos National Laboratory; Van Hensbergen, Eric [IBM AUSTIN RESEARCH LAB

    2009-01-01

    Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

  16. ELAN - expert system supported information and management system for analytical laboratories

    International Nuclear Information System (INIS)

    Jaeschke, A.; Orth, H.; Zilly, G.

    1990-08-01

    The demand for high efficiency and short response time calls for the use of computer support in chemico-analytical laboratories. This is usually achieved by laboratory information and management systems covering the three levels of analytical instrument automation, laboratory operation support and laboratory management. The management component of the systems implemented up to now suffers from a lack of flexibility as far as unforeseen analytical investigations outside the laboratory routine work are concerned. Another drawback is the lack of adaptability with respect to structural changes in laboratory organization. It can be eliminated by the application of expert system structures and methods for the implementation of this system level. The ELAN laboratory information and management system has been developed on the basis of this concept. (orig.) [de

  17. A management systems approach to pipeline integrity

    Energy Technology Data Exchange (ETDEWEB)

    Abes, J. [CC Technologies Canada, Calgary, AB (Canada)

    2008-07-01

    A management systems approach to pipeline integrity was discussed in terms of accident causation models, lessons from accidents, and management systems. Accident causation models include the Heinrich domino theory; epidemiological models; event chain models; and system-based models. A review of the Bellingham pipeline accident showed that if the pipeline had not been weakened by external damage, it likely would have been able to withstand the pressure that occurred on the day of the rupture, and the accident would not have happened. It was also determined that there was inadequate inspection of excavation work during the water treatment plant project and consequently, there was a failure to identify and repair the damage done to the pipeline. The presentation also addressed other findings, such as inaccurate evaluation of in-line pipeline inspection data; failure to manage and protect the supervisory control and data acquisition system (SCADA); and ineffective management oversight of construction and activation of products terminal. The Carlsbad pipeline explosion was also presented as another example of an accident. Several violations by El Paso were cited, including failure to ensure that qualified personnel performed internal corrosion control procedures; failure to perform necessary tests for corrosion; and failure to follow procedures for continuing surveillance of its facilities. Last, the presentation provided a definition of management systems and discussed the characteristics and elements of a management system. These elements included policy and leadership commitment; organizational structure and responsibilities; management of resources; communication plan; document and records management; operational controls; management of change; and continual improvement. 1 fig.

  18. Evaluation and Management of Right-Sided Heart Failure: A Scientific Statement From the American Heart Association.

    Science.gov (United States)

    Konstam, Marvin A; Kiernan, Michael S; Bernstein, Daniel; Bozkurt, Biykem; Jacob, Miriam; Kapur, Navin K; Kociol, Robb D; Lewis, Eldrin F; Mehra, Mandeep R; Pagani, Francis D; Raval, Amish N; Ward, Carey

    2018-05-15

    The diverse causes of right-sided heart failure (RHF) include, among others, primary cardiomyopathies with right ventricular (RV) involvement, RV ischemia and infarction, volume loading caused by cardiac lesions associated with congenital heart disease and valvular pathologies, and pressure loading resulting from pulmonic stenosis or pulmonary hypertension from a variety of causes, including left-sided heart disease. Progressive RV dysfunction in these disease states is associated with increased morbidity and mortality. The purpose of this scientific statement is to provide guidance on the assessment and management of RHF. The writing group used systematic literature reviews, published translational and clinical studies, clinical practice guidelines, and expert opinion/statements to summarize existing evidence and to identify areas of inadequacy requiring future research. The panel reviewed the most relevant adult medical literature excluding routine laboratory tests using MEDLINE, EMBASE, and Web of Science through September 2017. The document is organized and classified according to the American Heart Association to provide specific suggestions, considerations, or reference to contemporary clinical practice recommendations. Chronic RHF is associated with decreased exercise tolerance, poor functional capacity, decreased cardiac output and progressive end-organ damage (caused by a combination of end-organ venous congestion and underperfusion), and cachexia resulting from poor absorption of nutrients, as well as a systemic proinflammatory state. It is the principal cause of death in patients with pulmonary arterial hypertension. Similarly, acute RHF is associated with hemodynamic instability and is the primary cause of death in patients presenting with massive pulmonary embolism, RV myocardial infarction, and postcardiotomy shock associated with cardiac surgery. Functional assessment of the right side of the heart can be hindered by its complex geometry. Multiple

  19. Energy and water quality management systems for water utility's operations: a review.

    Science.gov (United States)

    Cherchi, Carla; Badruzzaman, Mohammad; Oppenheimer, Joan; Bros, Christopher M; Jacangelo, Joseph G

    2015-04-15

    Holistic management of water and energy resources is critical for water utilities facing increasing energy prices, water supply shortage and stringent regulatory requirements. In the early 1990s, the concept of an integrated Energy and Water Quality Management System (EWQMS) was developed as an operational optimization framework for solving water quality, water supply and energy management problems simultaneously. Approximately twenty water utilities have implemented an EWQMS by interfacing commercial or in-house software optimization programs with existing control systems. For utilities with an installed EWQMS, operating cost savings of 8-15% have been reported due to higher use of cheaper tariff periods and better operating efficiencies, resulting in the reduction in energy consumption of ∼6-9%. This review provides the current state-of-knowledge on EWQMS typical structural features and operational strategies and benefits and drawbacks are analyzed. The review also highlights the challenges encountered during installation and implementation of EWQMS and identifies the knowledge gaps that should motivate new research efforts. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. Electronic Resources Management System: Recommendation Report 2017

    KAUST Repository

    Ramli, Rindra M.

    2017-05-01

    This recommendation report provides an overview of the selection process for the new Electronic Resources Management System. The library has decided to move away from Innovative Interfaces Millennium ERM module. The library reviewed 3 system as potential replacements namely: Proquest 360 Resource Manager, Ex Libris Alma and Open Source CORAL ERMS. After comparing and trialling the systems, it was decided to go for Proquest 360 Resource Manager.

  1. Thermal management of EV battery systems

    Energy Technology Data Exchange (ETDEWEB)

    Birch, P.K.

    1984-01-01

    The thermal limitations of the actual design and the benefits of more extensive thermal management of electric vehicle systems are described. During this work a number of practical limitations in vehicle design, which has to be frozen relatively early in the project, made it impossible to take advantage of the benefits of thermal management in connection with the design of the modular battery system. This study, therfore, deals only very briefly with the actual project. The aim has been to show the possibilities of improvement based on traditional electrochemical systems (e.g., all lead-acid) by means of thermal management.

  2. Surgical management of colonic diverticular disease: discrepancy between right- and left-sided diseases.

    Science.gov (United States)

    Oh, Heung-Kwon; Han, Eon Chul; Ha, Heon-Kyun; Choe, Eun Kyung; Moon, Sang Hui; Ryoo, Seung-Bum; Jeong, Seung-Yong; Park, Kyu Joo

    2014-08-07

    To compare the outcome of the surgical management of left-sided and right-sided diverticular disease. The medical records of 77 patients who were surgically treated for diverticular disease between 1999 and 2010 in a tertiary referral hospital were retrospectively reviewed. The study population was limited to cases wherein the surgical specimen was confirmed as diverticulosis by pathology. Right-sided diverticula were classified as those arising from the cecum, ascending colon, and transverse colon, and those from the descending colon, sigmoid colon, and rectum were classified as left-sided diverticulosis. To assess the changing trend of occurrence of diverticulosis, data were compared with two previous studies of 51 patients. The proportion of left-sided disease cases was significantly increased compared to the results of our previous studies in 1994 and 2001, (27.5% vs 48.1%, P disease. However, patients with right-sided disease were significantly younger (50.9 year vs 64.0 year, P disease was significantly associated with a higher incidence of complicated diverticulitis (89.2% vs 57.5%, P diverticular disease, the incidence of left-sided disease in Korea has increased since 2001 and is associated with worse surgical outcomes.

  3. Management information system on radiation protection

    Energy Technology Data Exchange (ETDEWEB)

    Grossi, Pablo Andrade; Souza, Leonardo Soares de; Figueiredo, Geraldo Magela, E-mail: pabloag@cdtn.b, E-mail: lss@cdtn.b, E-mail: gmf@cdtn.b [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2011-07-01

    Considering the flux complexity and the multi source information of all radiation protection activities on nuclear organizations, an effective management information system based on technology, information and people is necessary to improve the safety on all processes and operations subjected to radiation risks. An effective management information system is an essential tool to highlight the strengths and weaknesses and identify behaviors and trends on the activities requiring radiation protection programs. Such kind of distinct knowledge is useful to reach an effective management and support the human decision-making on nuclear organization. This paper presents a management information system based on Brazilian directives and regulations on radiation protection. Due to its generic characteristics, this radiation protection control system can be implemented on any nuclear organization by reediting the non restricted parameters which could differ considering all facilities and laboratories expected on-site with diverse technologies applications. This system can be considered as a powerful tool applied on the continuous management of radiation protection activities on nuclear organizations and research institutes as well as for long term planning, not only indicating how the safety activities are going, but why they are not going as well as planned where that is the case. (author)

  4. Management information system on radiation protection

    International Nuclear Information System (INIS)

    Grossi, Pablo Andrade; Souza, Leonardo Soares de; Figueiredo, Geraldo Magela

    2011-01-01

    Considering the flux complexity and the multi source information of all radiation protection activities on nuclear organizations, an effective management information system based on technology, information and people is necessary to improve the safety on all processes and operations subjected to radiation risks. An effective management information system is an essential tool to highlight the strengths and weaknesses and identify behaviors and trends on the activities requiring radiation protection programs. Such kind of distinct knowledge is useful to reach an effective management and support the human decision-making on nuclear organization. This paper presents a management information system based on Brazilian directives and regulations on radiation protection. Due to its generic characteristics, this radiation protection control system can be implemented on any nuclear organization by reediting the non restricted parameters which could differ considering all facilities and laboratories expected on-site with diverse technologies applications. This system can be considered as a powerful tool applied on the continuous management of radiation protection activities on nuclear organizations and research institutes as well as for long term planning, not only indicating how the safety activities are going, but why they are not going as well as planned where that is the case. (author)

  5. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2)

    Energy Technology Data Exchange (ETDEWEB)

    Barndt, Shawn L. [Bonneville Power Administration, Portland, OR (United States)

    2003-04-04

    Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon #2). Bonneville Power Administration proposes to remove vegetation alongside Transmission Right-of-Ways

  6. Introduction to the Chemical Management System

    International Nuclear Information System (INIS)

    Sawyer, J.G.

    1993-01-01

    The CMS, a Laboratory-wide electronic chemical inventory tracking system, will assist PNL by establishing comprehensive, integrated, Laboratory-wide databases supported by consistent and standardized procedures for chemical inventory management. It will provide PNL with the information needed to meet its current chemical management responsibilities and regulatory requirements. Its objectives are to provide an inventory of all chemicals being held at PNL facilities, to provide a specific location for all chemical containers, to ensure that health and safety regulatory codes are being upheld, and to provide PNL staff and managers with hazardous-chemical information for better inventory management. It is composed of 5 modules: chemical purchasing; chemical inventory; chemical names, properties, and hazardous groups; reporting; and system manager

  7. Experiences with a technically oriented plant management system; Erfahrungen mit einem technisch orientierten Betriebs-Management-System

    Energy Technology Data Exchange (ETDEWEB)

    Haffmann, E. [GiS Gesellschaft fuer integrierte Systemplanung mbH, Erlangen (Germany)

    2000-07-01

    This contribution first deals with the duality of mercantile and technical plant management systems. The following aspects are considered: reasons for and history of this duality; different approaches taken by mercantile and technical plant management systems; differences in the standardisability of mercantile and technical tasks. Dissolution of the duality through coordinated interplay. The author then goes on to explain the most important components of technically oriented maintenance management. These include the collection of technical plant data (with maintenance-relevant data and relations); the establishment of recurring tasks, the commissioning method (involving occupational safety, packaging and evaluation), compilation of manuals, reporting and accompanying plant documentation. The following tools are useful for DP-assisted maintenance: depiction of organisational and operational structures (authorisation system + IBFS application); workflow systems; modelling (data and object models); navigators; form and dialogue generators; integration of external software (project planning, CAD and Office); interface to mercantile systems. Some highlights of the C/S-IBFS were demonstrated in practice at the symposium. [German] Das Referat behandelt zunaechst die Dualitaet von kaufmaennischen und technischen Betriebs-Management-Systemen anhand folgender Aspekte: - Gruende und Historie dieser Dualitaet, - unterschiedliche Loesungsansaetze von kaufmaennischen und technischen Betriebs-Management-Systemen, - unterschiedliche Standardisierbarkeit von kaufmaennischen und technischen Aufgabenstellungen, - Aufloesung der Dualitaet durch koordniertes Zusammenwirken. Sodann werden wichtige Bausteine eines technisch orientierten Instandhaltungs-Managements erlaeutert. Dazu gehoeren die technische Anlagenerfassung (mit instandhaltungsrelevanten Daten und Relationen), die Einrichtung wiederkehrender Aufgaben, das Arbeitsauftragsverfahren (mit Arbeitssicherheit, Paketierung und

  8. Intelligent Automatic Right-Left Sign Lamp Based on Brain Signal Recognition System

    Science.gov (United States)

    Winda, A.; Sofyan; Sthevany; Vincent, R. S.

    2017-12-01

    Comfort as a part of the human factor, plays important roles in nowadays advanced automotive technology. Many of the current technologies go in the direction of automotive driver assistance features. However, many of the driver assistance features still require physical movement by human to enable the features. In this work, the proposed method is used in order to make certain feature to be functioning without any physical movement, instead human just need to think about it in their mind. In this work, brain signal is recorded and processed in order to be used as input to the recognition system. Right-Left sign lamp based on the brain signal recognition system can potentially replace the button or switch of the specific device in order to make the lamp work. The system then will decide whether the signal is ‘Right’ or ‘Left’. The decision of the Right-Left side of brain signal recognition will be sent to a processing board in order to activate the automotive relay, which will be used to activate the sign lamp. Furthermore, the intelligent system approach is used to develop authorized model based on the brain signal. Particularly Support Vector Machines (SVMs)-based classification system is used in the proposed system to recognize the Left-Right of the brain signal. Experimental results confirm the effectiveness of the proposed intelligent Automatic brain signal-based Right-Left sign lamp access control system. The signal is processed by Linear Prediction Coefficient (LPC) and Support Vector Machines (SVMs), and the resulting experiment shows the training and testing accuracy of 100% and 80%, respectively.

  9. KNOWLEDGE MANAGEMENT AND INTELLECTUAL CAPITAL MANAGEMENT COUPLED TO QUALITY MANAGEMENT SYSTEM LEAD TO BUSINESS SUCCESS

    Directory of Open Access Journals (Sweden)

    Stevan Živojinović

    2009-03-01

    Full Text Available From the vantage point of contemporary management paradigm shift and new knowledge-based economy, we underscore the importance of relations and support of quality management system - QMS (according to ISO 9001 standard for management of knowledge and intellectual capital. QMS implementation, documenting, application, maintenance and continuous improvement, as a catalyst of effective organization management, provides a foundation for effective knowledge management and intellectual capital enlargement, via knowledge, skills, management systems, procedures, information and product flow, culture, inovation, relations with customers and other stakeholders. Simultaneous implementation and dynamic interaction of these advanced management concepts intended to attain competitive advantage can result in synergic effects and improved performance. From the perspective of knowledge, as a central unifying notion, organizational behavior based on learning influences long-term business success, process effectiveness and customer satisfaction.

  10. A Management Information System Model for Program Management. Ph.D. Thesis - Oklahoma State Univ.; [Computerized Systems Analysis

    Science.gov (United States)

    Shipman, D. L.

    1972-01-01

    The development of a model to simulate the information system of a program management type of organization is reported. The model statistically determines the following parameters: type of messages, destinations, delivery durations, type processing, processing durations, communication channels, outgoing messages, and priorites. The total management information system of the program management organization is considered, including formal and informal information flows and both facilities and equipment. The model is written in General Purpose System Simulation 2 computer programming language for use on the Univac 1108, Executive 8 computer. The model is simulated on a daily basis and collects queue and resource utilization statistics for each decision point. The statistics are then used by management to evaluate proposed resource allocations, to evaluate proposed changes to the system, and to identify potential problem areas. The model employs both empirical and theoretical distributions which are adjusted to simulate the information flow being studied.

  11. A method and system for power management

    NARCIS (Netherlands)

    Burchard, Arthur Tadeusz; Goossens, Koos Gerard Willen; Milutinovic, A.; Molnos, Anca Mariana; Steffens, Elisabeth Francisca Maria

    2009-01-01

    A method and system for power management is provided. To control power supplied to a second electronic device (106), an electronic system (100) comprises a power management subsystem (110), a first electronic device (102); The power management subsystem (110) monitors the power consumed by the first

  12. A Customary Right to Fish when Fish are Sparse: Managing Conflicting Claims between Customary Rights and Environmental Rights

    Directory of Open Access Journals (Sweden)

    Loretta Feris

    2013-12-01

    Full Text Available This contribution considers the potential conflicts that may arise between customary rights and environmental rights in the face of dwindling marine resources. It sets the scene by reflecting on some of the common themes present in indigenous claims to marine resource by communities who were subjected to colonisation. In doing so it analyses the South African judgment, S v Gongqose Case No. E382/10 (unreported, which alluded to the existence of a customary right to fishing, a concept that has until now remained unexplored in South African law. This discussion is followed by a brief overview of the rapidly declining state of marine resources, worldwide and in South Africa. The note then considers the relationship between customary law and marine resources and some of the challenges in meeting rights-based customary claims to marine resources against the need to conserve a dwindling resource. It concludes by offering possibilities for reconciliation.

  13. Information systems project management: methods, tools, and techniques

    OpenAIRE

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  14. Left-right asymmetries of behaviour and nervous system in invertebrates.

    Science.gov (United States)

    Frasnelli, Elisa; Vallortigara, Giorgio; Rogers, Lesley J

    2012-04-01

    Evidence of left-right asymmetries in invertebrates has begun to emerge, suggesting that lateralization of the nervous system may be a feature of simpler brains as well as more complex ones. A variety of studies have revealed sensory and motor asymmetries in behaviour, as well as asymmetries in the nervous system, in invertebrates. Asymmetries in behaviour are apparent in olfaction (antennal asymmetries) and in vision (preferential use of the left or right visual hemifield during activities such as foraging or escape from predators) in animals as different as bees, fruitflies, cockroaches, octopuses, locusts, ants, spiders, crabs, snails, water bugs and cuttlefish. Asymmetries of the nervous system include lateralized position of specific brain structures (e.g., in fruitflies and snails) and of specific neurons (e.g., in nematodes). As in vertebrates, lateralization can occur both at the individual and at the population-level in invertebrates. Theoretical models have been developed supporting the hypothesis that the alignment of the direction of behavioural and brain asymmetries at the population-level could have arisen as a result of social selective pressures, when individually asymmetrical organisms had to coordinate with each other. The evidence reviewed suggests that lateralization at the population-level may be more likely to occur in social species among invertebrates, as well as vertebrates. Copyright © 2012 Elsevier Ltd. All rights reserved.

  15. Facility information management system; Shisetsu joho kanri system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-10

    A facility management system (FMS) was developed as a tool for efficiently operating and managing building facilities and related equipment. The maintenance management data is designed to be collected through automatic formation of data base by using a work flow function and releasing the daily business from paper work. The data base thus formed can be retrieved and displayed by utilizing a network system. The plan view for construction facilities is made a minute plan comparable to the ground plan by taking in DXF type drawing data such as a completion drawing, making it a colored display for example to create an intuitive expression understandable at first sight. The plan is controlled by the level including equipment classification and is capable of superimposed display. Detailed management data is displayed by mouse clicking of registered icons, allowing required information to be readily taken out. (translated by NEDO)

  16. Smart energy management system

    Science.gov (United States)

    Desai, Aniruddha; Singh, Jugdutt

    2010-04-01

    Peak and average energy usage in domestic and industrial environments is growing rapidly and absence of detailed energy consumption metrics is making systematic reduction of energy usage very difficult. Smart energy management system aims at providing a cost-effective solution for managing soaring energy consumption and its impact on green house gas emissions and climate change. The solution is based on seamless integration of existing wired and wireless communication technologies combined with smart context-aware software which offers a complete solution for automation of energy measurement and device control. The persuasive software presents users with easy-to-assimilate visual cues identifying problem areas and time periods and encourages a behavioural change to conserve energy. The system allows analysis of real-time/statistical consumption data with the ability to drill down into detailed analysis of power consumption, CO2 emissions and cost. The system generates intelligent projections and suggests potential methods (e.g. reducing standby, tuning heating/cooling temperature, etc.) of reducing energy consumption. The user interface is accessible using web enabled devices such as PDAs, PCs, etc. or using SMS, email, and instant messaging. Successful real-world trial of the system has demonstrated the potential to save 20 to 30% energy consumption on an average. Low cost of deployment and the ability to easily manage consumption from various web enabled devices offers gives this system a high penetration and impact capability offering a sustainable solution to act on climate change today.

  17. Air System Information Management

    Science.gov (United States)

    Filman, Robert E.

    2004-01-01

    I flew to Washington last week, a trip rich in distributed information management. Buying tickets, at the gate, in flight, landing and at the baggage claim, myriad messages about my reservation, the weather, our flight plans, gates, bags and so forth flew among a variety of travel agency, airline and Federal Aviation Administration (FAA) computers and personnel. By and large, each kind of information ran on a particular application, often specialized to own data formats and communications network. I went to Washington to attend an FAA meeting on System-Wide Information Management (SWIM) for the National Airspace System (NAS) (http://www.nasarchitecture.faa.gov/Tutorials/NAS101.cfm). NAS (and its information infrastructure, SWIM) is an attempt to bring greater regularity, efficiency and uniformity to the collection of stovepipe applications now used to manage air traffic. Current systems hold information about flight plans, flight trajectories, weather, air turbulence, current and forecast weather, radar summaries, hazardous condition warnings, airport and airspace capacity constraints, temporary flight restrictions, and so forth. Information moving among these stovepipe systems is usually mediated by people (for example, air traffic controllers) or single-purpose applications. People, whose intelligence is critical for difficult tasks and unusual circumstances, are not as efficient as computers for tasks that can be automated. Better information sharing can lead to higher system capacity, more efficient utilization and safer operations. Better information sharing through greater automation is possible though not necessarily easy.

  18. Realizing right to health through universal health coverage

    Directory of Open Access Journals (Sweden)

    ANJALI Singh

    2014-07-01

    Full Text Available Recognition of right to health is an essential step to work towards improvement of public health and to attain highest standard of physical and mental health of the people. Right to health in India is implicit part of right to life under Article 19 mentioned in the Constitution of India but is not recognized per se. Universal Health Coverage adopts rights based approach and principles of universality, equity, empowerment and comprehensiveness of care. The Universal Coverage Report of India makes recommendations in six identified areas to revamp the health systems in order to ensure right to health of Indians. These areas are: health financing and financial protection; health service norms; human resources for health; community participation and citizen engagement; access to medicines, vaccines and techno- logy; management and institutional reforms. This paper attempts to determine the ways inwhich Universal Health Coverage can make a contribution in realizing right to health and thus human rights in developing countries.

  19. The role of NOSA five-star management system for occupational management of nuclear power plants

    International Nuclear Information System (INIS)

    Zhang Qin

    2011-01-01

    The occupational safety management of nuclear power plant is developed towards integrated management, risk management, process management, all-round and full staff participation. Appropriate management method integrated with nuclear power plant safety, health and environmental protection could be organically combined with the nuclear safety operation management system, and could jointly lay a solid foundation for building up good nuclear safety culture. NOSA five-star management system is such a kind of risk management based on safety, health and environmental management system, with an aim to protect the personal safety. The concepts of NOSA management and nuclear safety culture are coincident, with strong workability, and meeting the need of nuclear power plant occupational safety management. Adopting NOSA five-star management system and keeping continuous improvement is one of the effective ways to improve the level of occupational safety management of nuclear power plant. It can be organically combined with nuclear safety operation management system and continuously improved safety culture to play an important role in improving the safety and economics of nuclear power plant. (author)

  20. RIMS: Resource Information Management System

    Science.gov (United States)

    Symes, J.

    1983-01-01

    An overview is given of the capabilities and functions of the resource management system (RIMS). It is a simple interactive DMS tool which allows users to build, modify, and maintain data management applications. The RIMS minimizes programmer support required to develop/maintain small data base applications. The RIMS also assists in bringing the United Information Services (UIS) budget system work inhouse. Information is also given on the relationship between the RIMS and the user community.

  1. System of business-processes management at motor-transport enterprise

    OpenAIRE

    Коgut, Y.

    2010-01-01

    The place of the system of business-processes management at motor-transport enterprise in the general system of management of the enterprise has been substantiated. The subsystems of strategic management, business-processes management of strategic orientation and current activity, processes of enterprise functioning management have been marked out. The system of motor-transport enterprise business-processes management has been formed, which, unlike the existing ones, is based on the system-cy...

  2. Management system, organizational climate and performance relationships

    Science.gov (United States)

    Davis, B. D.

    1979-01-01

    Seven aerospace firms were investigated to determine if a relationship existed among management systems, organizational climate, and organization performance. Positive relationships were found between each of these variables, but a statistically significant relationship existed only between the management system and organizational climate. The direction and amount of communication and the degree of decentralized decision-making, elements of the management system, also had a statistically significant realtionship with organization performance.

  3. A model for international border management systems.

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, Ruth Ann

    2008-09-01

    To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.

  4. 20 CFR 632.76 - Program management systems.

    Science.gov (United States)

    2010-04-01

    ... management and participant tracking systems in accordance with § 632.32 and § 632.77. The principal... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management systems. 632.76 Section... NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Program Design and Management § 632.76 Program...

  5. Development of accounting quality management system

    Directory of Open Access Journals (Sweden)

    Plakhtii T.F.

    2017-08-01

    Full Text Available Accounting organization as one of the types of practical activities at the enterprise involves organization of the process of implementation of various kinds of accounting procedures to ensure meeting needs of the users of accounting information. Therefore, to improve its quality an owner should use tools, methods and procedures that enable to improve the quality of implementation of accounting methods and technology. The necessity of using a quality management system for the improvement of accounting organization at the enterprise is substantiated. The system of accounting quality management is developed and grounded in the context of ISO 9001:2015, which includes such processes as the processes of the accounting system, leadership, planning, and evaluation. On the basis of specification and justification of the set of universal requirements (content requirements, formal requirements the model of the environment of demands for high-quality organization of the computerized accounting system that improves the process of preparing high quality financial statements is developed. In order to improve the system of accounting quality management, to justify the main objectives of its further development, namely elimination of unnecessary characteristics of accounting information, the differences between the current level of accounting information quality and its perfect level are considered; the meeting of new needs of users of accounting information that have not been satisfied yet. The ways of leadership demonstration in the system of accounting quality management of accounting subjects at the enterprise are substantiated. The relationship between the current level of accounting information quality and its perfect level is considered. The possible types of measures aimed at improving the system of accounting quality management are identified. The paper grounds the need to include the principle of proper management in the current set of accounting

  6. Technical Literature Review Concerning Management Information Systems.

    Science.gov (United States)

    interrelationships of the many aspects of management information systems (MIS); that is, with how analysis, design, operation, evaluation, and user considerations affect management information systems . (Author)

  7. Management of complex data flows in the ASDEX Upgrade plasma control system

    Energy Technology Data Exchange (ETDEWEB)

    Treutterer, Wolfgang, E-mail: Wolfgang.Treutterer@ipp.mpg.de [Max-Planck Institut fuer Plasmaphysik, EURATOM Association, Garching (Germany); Neu, Gregor; Raupp, Gerhard; Zasche, Dieter; Zehetbauer, Thomas [Max-Planck Institut fuer Plasmaphysik, EURATOM Association, Garching (Germany); Cole, Richard; Lueddecke, Klaus [Unlimited Computer Systems, Iffeldorf (Germany)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer Control system architectures with data-driven workflows are efficient, flexible and maintainable. Black-Right-Pointing-Pointer Signal groups provide coherence of interrelated signals and increase the efficiency of process synchronisation. Black-Right-Pointing-Pointer Sample tags indicating sample quality form the fundament of a local event handling strategy. Black-Right-Pointing-Pointer A self-organising workflow benefits from sample tags consisting of time stamp and stream activity. - Abstract: Establishing adequate technical and physical boundary conditions for a sustained nuclear fusion reaction is a challenging task. Phased feedback control and monitoring for heating, fuelling and magnetic shaping is mandatory, especially for fusion devices aiming at high performance plasmas. Technical and physical interrelations require close collaboration of many components in sequential as well as in parallel processing flows. Moreover, handling of asynchronous, off-normal events has become a key element of modern plasma performance optimisation and machine protection recipes. The manifoldness of plasma states and events, the variety of plant system operation states and the diversity in diagnostic data sampling rates can hardly be mastered with a rigid control scheme. Rather, an adaptive system topology in combination with sophisticated synchronisation and process scheduling mechanisms is suited for such an environment. Moreover, the system is subject to real-time control constraints: response times must be deterministic and adequately short. Therefore, the experimental tokamak device ASDEX Upgrade employs a discharge control system DCS, whose core has been designed to meet these requirements. In the paper we will compare the scheduling schemes for the parallelised realisation of a control workflow and show the advantage of a data-driven workflow over a managed workflow. The data-driven workflow as used in DCS is based on signals

  8. Respiratory care management information systems.

    Science.gov (United States)

    Ford, Richard M

    2004-04-01

    Hospital-wide computerized information systems evolved from the need to capture patient information and perform billing and other financial functions. These systems, however, have fallen short of meeting the needs of respiratory care departments regarding work load assessment, productivity management, and the level of outcome reporting required to support programs such as patient-driven protocols. The respiratory care management information systems (RCMIS) of today offer many advantages over paper-based systems and hospital-wide computer systems. RCMIS are designed to facilitate functions specific to respiratory care, including assessing work demand, assigning and tracking resources, charting, billing, and reporting results. RCMIS incorporate mobile, point-of-care charting and are highly configurable to meet the specific needs of individual respiratory care departments. Important and substantial benefits can be realized with an RCMIS and mobile, wireless charting devices. The initial and ongoing costs of an RCMIS are justified by increased charge capture and reduced costs, by way of improved productivity and efficiency. It is not unusual to recover the total cost of an RCMIS within the first year of its operation. In addition, such systems can facilitate and monitor patient-care protocols and help to efficiently manage the vast amounts of information encountered during the practitioner's workday. Respiratory care departments that invest in RCMIS have an advantage in the provision of quality care and in reducing expenses. A centralized respiratory therapy department with an RCMIS is the most efficient and cost-effective way to monitor work demand and manage the hospital-wide allocation of respiratory care services.

  9. Region 7 Laboratory Information Management System

    Science.gov (United States)

    This is metadata documentation for the Region 7 Laboratory Information Management System (R7LIMS) which maintains records for the Regional Laboratory. Any Laboratory analytical work performed is stored in this system which replaces LIMS-Lite, and before that LAST. The EPA and its contractors may use this database. The Office of Policy & Management (PLMG) Division at EPA Region 7 is the primary managing entity; contractors can access this database but it is not accessible to the public.

  10. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  11. Distributing radiation management system of nuclear power plants

    International Nuclear Information System (INIS)

    Mihoya, Eiichi; Akashi, Michio

    1999-01-01

    The importance of radiation management for nuclear facilities including nuclear power plants has increased as the general public understanding has progressed, and necessary information for management must be processed exactly and quickly. In nuclear power plants, radiation management is performed by each individual operation, and collected information is managed by the system of each operation. The distributing radiation management system has been developed aiming to use a general-purpose LAN and make quick and efficient use of information managed by individual operations. This paper describes the system configuration and functions. (author)

  12. Study of Intelligent Secure Chemical Inventory Management System

    Science.gov (United States)

    Shukran, Mohd Afizi Mohd; Naim Abdullah, Muhammad; Nazri Ismail, Mohd; Maskat, Kamaruzaman; Isa, Mohd Rizal Mohd; Shahfee Ishak, Muhammad; Adib Khairuddin, Muhamad

    2017-08-01

    Chemical inventory management system has been experiencing a new revolution from traditional inventory system which is manual to an automated inventory management system. In this paper, some review of the classic and modern approaches to chemical inventory management system has been discussed. This paper also describe about both type of inventory management. After a comparative analysis of the traditional method and automated method, it can be said that both methods have some distinctive characteristics. Moreover, the automated inventory management method has higher accuracy of calculation because the calculations are handled by software, eliminating possible errors and saving time. The automated inventory system also allows users and administrators to track the availability, location and consumption of chemicals. The study of this paper can provide forceful review analysis support for the chemical inventory management related research.

  13. Place of Budget Management in the General System of Trade Enterprise Management

    Directory of Open Access Journals (Sweden)

    Kravchenko Olena S.

    2014-01-01

    Full Text Available The article grounds urgency of identification of the place of budget management in the general system of trade enterprise management. It analyses points of view of economists with respect to definitions of the “budgeting” and “budget management” terms. It considers main functions of budget management. It identifies the place of budget management in the general system of enterprise management. Pursuant to definition of the budget management as a managerial technology, which should meet a number of requirements, which would be determined by specific features of enterprise practical activity, the article identifies its main principles. It groups principles of budget management in accordance with the functions it performs.

  14. Forest fire management to avoid unintended consequences: a case study of Portugal using system dynamics.

    Science.gov (United States)

    Collins, Ross D; de Neufville, Richard; Claro, João; Oliveira, Tiago; Pacheco, Abílio P

    2013-11-30

    Forest fires are a serious management challenge in many regions, complicating the appropriate allocation to suppression and prevention efforts. Using a System Dynamics (SD) model, this paper explores how interactions between physical and political systems in forest fire management impact the effectiveness of different allocations. A core issue is that apparently sound management can have unintended consequences. An instinctive management response to periods of worsening fire severity is to increase fire suppression capacity, an approach with immediate appeal as it directly treats the symptom of devastating fires and appeases the public. However, the SD analysis indicates that a policy emphasizing suppression can degrade the long-run effectiveness of forest fire management. By crowding out efforts to preventative fuel removal, it exacerbates fuel loads and leads to greater fires, which further balloon suppression budgets. The business management literature refers to this problem as the firefighting trap, wherein focus on fixing problems diverts attention from preventing them, and thus leads to inferior outcomes. The paper illustrates these phenomena through a case study of Portugal, showing that a balanced approach to suppression and prevention efforts can mitigate the self-reinforcing consequences of this trap, and better manage long-term fire damages. These insights can help policymakers and fire managers better appreciate the interconnected systems in which their authorities reside and the dynamics that may undermine seemingly rational management decisions. Copyright © 2013 Elsevier Ltd. All rights reserved.

  15. APPLICATION OF BUSINESS CONTINUITY MANAGEMENT SYSTEM INTO THE CRISIS MANAGEMENT FIELD

    Directory of Open Access Journals (Sweden)

    Hana MALACHOVÁ

    2016-12-01

    Full Text Available Establishing business continuity management (BCM creates the basis of every organization’s strategy. BCM includes complex procedures that help solving unexpected situations of natural and anthropogenic nature (e.g. fire or flood. Planning of the BCM is a process that helps organizations identify critical processes and implement plans for securing and restoring key processes. The aim of this paper is to demonstrate the application of a systemic approach to BCM known as Business Continuity Management System (BCMS into the military field. This article describes the life cycle of the BCMS, which is based on PDCA cycle. Subsequently it is applied to the activities carried out by the University of Defence during activation of forces and means in the frame of the Integrated Rescue System (IRS in case of emergency – an accident in a nuclear power plant in the Czech Republic. Activities in various stages of deployment of allocated forces and means are managed and evaluated using the Military Continuity Management System (MCMS application.

  16. Creating legal rights for rivers: lessons from Australia, New Zealand, and India

    Directory of Open Access Journals (Sweden)

    Erin L. O'Donnell

    2018-03-01

    Full Text Available As pressures on water resources increase, the demand for innovative institutional arrangements, which address the overuse of water, and underprovision of ecosystem health, is rising. One new and emerging approach is the use of legal personality to protect water systems in law through the granting of legal rights to rivers. This constitutes a significant development in the fields of environmental law and water resources management, yet little analysis is available of how the approach has been used and applied. We critically examine the new legal rights for rivers using three case studies from Australia, New Zealand, and India. We analyze how legal rights have been created in each case, and the complexity of enforcing these legal rights to protect the rivers. We conclude that legal personality could be a useful alternative approach for river management, provided that the new legal rights are given sufficient force and effect.

  17. Building control. Technical building systems: Automation and management; Building Control. Technische Gebaeudesysteme: Automation und Bewirtschaftung

    Energy Technology Data Exchange (ETDEWEB)

    Kranz, H.R.; Baenninger, M.; Bieler, P.; Brettschneider, J.P.; Damnig, A.; Fassbender, H.W.; Friedrichs, K.; Gauchel, J.; Hegewald, B.; Kaelin, W.; Lezius, A.; Markert, H.; Oehler, A.; Otto, J.; Puettmer, M. Jr.; Rohrbacher, H.; Schuerdt, K.; Vogt, D.; Wittling, J.

    1995-12-31

    Cost-optimised management and maintenance of buildings can no longer be carried out without electronic data processing. The present anthology gives a comprehensive overview of the planning and operation of building automation systems. The following topics are discussed: ecological cooling and facade concepts, facility management, jeopardy alarm technology, building automation, communication technology, open communication and networks, building system technology, norms and directives, building right and law. A special abstract has been prepared for each of the 23 chapters. (BWI). 260 figs., 161 refs. [Deutsch] Kostenoptimiertes Management, Bewirtschaftung und Instandhaltung von Gebaeuden sind ohne EDV nicht mehr denkbar. Das vorliegende Buch gibt einen umfassenden Ueberblick ueber Planung und Betrieb von Gebaeudeautomationssystemen. Es wird dabei auf folgende Themenkomplexe eingegangen: Oekologische Kuehl- und Fassadenkonzepte; Facility Management, Gefahrenmeldetechnik, Gebaeudeautomation; Kommunikationstechnik, offenen Kommunikation und Netzwerke; Gebaeudesystemtechnik und Installationsbus; Energiemanagement; Betreibererfahrungen; Normen und Richtlinien; Baurecht und Gesetz. Fuer alle 23 Einzelkapitel wurde eine gesonderte inhaltliche Erschliessung durchgefuehrt. (BWI)

  18. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  19. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2013-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of management systems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of

  20. Real-time multi-function entry / exit management system

    International Nuclear Information System (INIS)

    Hiyama, Kazuhisa; Kurosawa, Akihiko; Asano, Norikazu; Onoue, Ryuji; Eguchi, Shohei; Hanawa, Nobuhiro; Hori, Naohiko; Ueda, Hisao; Kanda, Hiroaki

    2012-01-01

    In order to prevent radiation accident and its expansion, more integrated management system is required to safety management for radiation workers in the nuclear facilities. Therefore, JAEA (Japan Atomic Energy Agency) and HAM (Hitachi Aloka Medical, Ltd) have developed innovative real-time multi-function entry/exit management system which managed worker's exposed dose and position under the joint developed patent. This system is sharing worker's data among workers and server manager who is inside of or outside of building, such as worker's positing, health condition and exposed dose. It consists of mobile equipments, receivers, LAN, and servers system. This report summarizes the system to be installed in the JMTR. (author)

  1. Double-button Fixation System for Management of Acute Acromioclavicular Joint Dislocation

    Directory of Open Access Journals (Sweden)

    Ali Torkaman

    2016-01-01

    Full Text Available Background: Surgical treatments for acromioclavicular (AC joint dislocation present with some complications. The present study was designed to evaluate the double-button fixation system in the management of acute acromioclavicular joint dislocation. Methods: This cross sectional study, done between February 2011 to June 2014, consisted of 28 patients who underwent surgical management by the double-button fixation system for acute AC joint dislocation. Age, sex, injury mechanism, dominant hand, side with injury, length of follow up, time before surgery, shoulder and hand (DASH, constant and visual analogue scale (VAS scores, and all complications of the cases during the follow up were recorded. Results: The mean age of patients was 33.23±6.7 years. Twenty four patients (85.71% were male and four (14.28% were female. The significant differences were observed between pre-operation VAS, constant shoulder scores and post-operation measurements (P=0.001, P=0.0001, P=0.0001, respectively. There were not any significant differences between right and left coracoclavicular (P=0.238, but two cases of heterotrophic ossifications were recorded. The mean follow-up time was 16.17±4.38 months. Conclusion: According to the results, the double-button fixation system for management of acute acromioclavicular joint dislocation has suitable results and minimal damage to the soft tissues surrounding the coracoclavicular ligaments.

  2. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  3. 46 CFR 16.500 - Management Information System requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  4. The Prototype Automated Research Management System (ARMS)

    National Research Council Canada - National Science Library

    Prekop, Paul

    2004-01-01

    Automated Research Management System (ARMS) is a knowledge management application designed to address many of the knowledge management problems identified by SmartWays and FASSP's Knowledge Management Review...

  5. Metrics for border management systems.

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, Ruth Ann

    2009-07-01

    There are as many unique and disparate manifestations of border systems as there are borders to protect. Border Security is a highly complex system analysis problem with global, regional, national, sector, and border element dimensions for land, water, and air domains. The complexity increases with the multiple, and sometimes conflicting, missions for regulating the flow of people and goods across borders, while securing them for national security. These systems include frontier border surveillance, immigration management and customs functions that must operate in a variety of weather, terrain, operational conditions, cultural constraints, and geopolitical contexts. As part of a Laboratory Directed Research and Development Project 08-684 (Year 1), the team developed a reference framework to decompose this complex system into international/regional, national, and border elements levels covering customs, immigration, and border policing functions. This generalized architecture is relevant to both domestic and international borders. As part of year two of this project (09-1204), the team determined relevant relative measures to better understand border management performance. This paper describes those relative metrics and how they can be used to improve border management systems.

  6. INDUSTRIAL ENTERPRISE MANAGEMENT SYSTEM QUALITY ASSESMENT

    Directory of Open Access Journals (Sweden)

    S. V. Pankov

    2012-01-01

    Full Text Available Management systems of small-scale enterprises in Moscow region are of centralized linear type. Misunderstanding of the need for qualitymanagement operational processes is observed in such business structures. Using correct management systems results in reduction of business costs and increase of business economic efficiency and entrepreneurship social role.

  7. Improvements to information management systems simulator

    Science.gov (United States)

    Bilek, R. W.

    1972-01-01

    The performance of personnel in the augmentation and improvement of the interactive IMSIM information management simulation model is summarized. With this augmented model, NASA now has even greater capabilities for the simulation of computer system configurations, data processing loads imposed on these configurations, and executive software to control system operations. Through these simulations, NASA has an extremely cost effective capability for the design and analysis of computer-based data management systems.

  8. Interconnecting heterogeneous database management systems

    Science.gov (United States)

    Gligor, V. D.; Luckenbaugh, G. L.

    1984-01-01

    It is pointed out that there is still a great need for the development of improved communication between remote, heterogeneous database management systems (DBMS). Problems regarding the effective communication between distributed DBMSs are primarily related to significant differences between local data managers, local data models and representations, and local transaction managers. A system of interconnected DBMSs which exhibit such differences is called a network of distributed, heterogeneous DBMSs. In order to achieve effective interconnection of remote, heterogeneous DBMSs, the users must have uniform, integrated access to the different DBMs. The present investigation is mainly concerned with an analysis of the existing approaches to interconnecting heterogeneous DBMSs, taking into account four experimental DBMS projects.

  9. Experimental study of mini SCADA renewable energy management system on microgrid using Raspberry Pi

    Science.gov (United States)

    Tridianto, E.; Permatasari, P. D.; Ali, I. R.

    2018-03-01

    Renewable Energy Management System (REMS) is a device that can be able to monitor power through a microgrid. The purpose of this system is to optimize power usage that produced from renewable energy with the result that reduces power demand from the grid. To reach the goal this device manage the load power needs fully supplied by renewable energy when the power produced from renewable energy is higher than load demand, besides power surplus will be stored in battery in this way energy stored in battery can be used when it needed. When the power produced from renewable energy can not satisfy the power demand, power will supply by renewable energy and grid. This device uses power meters for record any power flow through microgrid. In order to manage power flow in microgrid this system use relay module. The user can find out energy consumption (consumed by the load) and production (produced by renewable energy) in a period of time so that the user can switch on the load in right time.

  10. 48 CFR 52.234-4 - Earned Value Management System.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  11. DIRAC Data Management System

    CERN Document Server

    Smith, A C

    2007-01-01

    The LHCb experiment being built to utilize CERN’s flagship Large Hadron Collider will generate data to be analysed by a community of over 600 physicists worldwide. DIRAC, LHCb’s Workload and Data Management System, facilitates the use of underlying EGEE Grid resources to generate, process and analyse this data in the distributed environment. The Data Management System, presented here, provides real-time, data-driven distribution in accordance with LHCb’s Computing Model. The data volumes produced by the LHC experiments are unprecedented, rendering individual institutes and even countries, unable to provide the computing and storage resources required to make full use of the produced data. EGEE Grid resources allow the processing of LHCb data possible in a distributed fashion and LHCb’s Computing Model is based on this approach. Data Management in this environment requires reliable and high-throughput transfer of data, homogeneous access to storage resources and the cataloguing of data replicas, all of...

  12. Mastering System Center 2012 Configuration Manager

    CERN Document Server

    Rachui, Steve; Martinez, Santos; Daalmans, Peter

    2012-01-01

    Expert coverage of Microsoft's highly anticipated network software deployment tool The latest version of System Center Configuration Manager (SCCM) is a dramatic update of its predecessor Configuration Manager 2007, and this book offers intermediate-to-advanced coverage of how the new SCCM boasts a simplified hierarchy, role-based security, a new console, flexible application deployment, and mobile management. You'll explore planning and installation, migrating from SCCM 2007, deploying software and operating systems, security, monitoring and troubleshooting, and automating and customizing SCC

  13. Information Security Management System toolkit

    OpenAIRE

    Καραμανλής, Μάνος; Karamanlis, Manos

    2016-01-01

    Secure management of information is becoming critical for any organization because information is one of the most valuable assets in organization’s business operations. An Information security management system (ISMS) consists of the policies, procedures, guidelines, and associated resources and activities, collectively managed by an organization, in the pursuit of protecting its information assets. An ISMS is a systematic approach for establishing, implementing, operating, mon...

  14. A SUSTAINABLE HEALTH CARE SYSTEM REQUIRES MANAGEMENT TRANSFORMATION

    Directory of Open Access Journals (Sweden)

    Kanellopoulos Dimitros

    2011-12-01

    Full Text Available In order to be the health care system sustainable , management transformations must be based on very precise diagnostic analysis that includes complete and current information. It is necessary to implement an information system that collects information in real time, that watches the parameters that significantly influence the sustainability of the system. Such an information system should point out a radiography(a scan of the system at some time under following aspects:: 1. An overview of system; 2 An overview of the economic situation; 3 A technical presentation ;4. A legal overview; 5. A social overview ; 6. A management overview .Based on these Xrays of the health system, it outlines a series of conclusions and recommendations together with a SWOT analysis that highlights the potential internal (strengths and weaknesses and external potential (opportunities and threats. Based on this analysis and recommendations, the management is going to redesign the system in order to be adapted to the changing environmental requirements. Management transformation is recommended to be by following steps. :1. The development of a new management system that would make a positive change in the health care system 2. Implementation of the new management system 3. Assessment of the changes

  15. Dynamic simulation for effective workforce management in new product development

    Directory of Open Access Journals (Sweden)

    M. Mutingi

    2012-10-01

    Full Text Available Effective planning and management of workforce for new product development (NPD projects is a great challenge to many organisations, especially in the presence of engineering changes during the product development process. The management objective in effective workforce management is to recruit, develop and deploy the right people at the right place at the right time so as to fulfill organizational objectives. In this paper, we propose a dynamic simulation model to address the workforce management problem in a typical NPD project consisting of design, prototyping, and production phases. We assume that workforce demand is a function of project work remaining and the current available skill pool. System dynamics simulation concepts are used to capture the causality relationships and feedback loops in the workforce system from a systems thinking. The evaluation of system dynamics simulation reveals the dynamic behaviour in NPD workforce management systems and shows how adaptive dynamic recruitment and training decisions can effectively balance the workforce system during the NPD process.

  16. Hemodynamic analysis of sequential graft from right coronary system to left coronary system.

    Science.gov (United States)

    Wang, Wenxin; Mao, Boyan; Wang, Haoran; Geng, Xueying; Zhao, Xi; Zhang, Huixia; Xie, Jinsheng; Zhao, Zhou; Lian, Bo; Liu, Youjun

    2016-12-28

    Sequential and single grafting are two surgical procedures of coronary artery bypass grafting. However, it remains unclear if the sequential graft can be used between the right and left coronary artery system. The purpose of this paper is to clarify the possibility of right coronary artery system anastomosis to left coronary system. A patient-specific 3D model was first reconstructed based on coronary computed tomography angiography (CCTA) images. Two different grafts, the normal multi-graft (Model 1) and the novel multi-graft (Model 2), were then implemented on this patient-specific model using virtual surgery techniques. In Model 1, the single graft was anastomosed to right coronary artery (RCA) and the sequential graft was adopted to anastomose left anterior descending (LAD) and left circumflex artery (LCX). While in Model 2, the single graft was anastomosed to LAD and the sequential graft was adopted to anastomose RCA and LCX. A zero-dimensional/three-dimensional (0D/3D) coupling method was used to realize the multi-scale simulation of both the pre-operative and two post-operative models. Flow rates in the coronary artery and grafts were obtained. The hemodynamic parameters were also showed, including wall shear stress (WSS) and oscillatory shear index (OSI). The area of low WSS and OSI in Model 1 was much less than that in Model 2. Model 1 shows optimistic hemodynamic modifications which may enhance the long-term patency of grafts. The anterior segments of sequential graft have better long-term patency than the posterior segments. With rational spatial position of the heart vessels, the last anastomosis of sequential graft should be connected to the main branch.

  17. Advantages and Limitations of Integrated Management System: the Theoretical Viewpoint

    Directory of Open Access Journals (Sweden)

    Agota Giedrė Raišienė

    2011-08-01

    Full Text Available Purpose. The goal of the paper is to discuss the potential benefits and to highlight the drawbacks of integrated management system for organizations that seek to improve management process.Methodology. Methods of the research were used: analysis of a scientific and special literature that presents the requirements, models and results of integrated management systems studies, and analysis of statistical data to assess actuality of integrated management systems for enterprises in Lithuania.Findings. Summarizing research findings, it should be stated that the implementation of management system integration should be based on provision of social responsibility and holistic approach to the organization. It requires the long-term united efforts of leaders in a strategic hierarchical level and high organizational maturity to ensure the fluency of the running stages of planning management system integration, preparing documentations, implementing and realizing integrated management system. Also it is necessary to purify the conception of integrated management system in organizational context. Theoretical analysis of integrated management systems show, that all of the management systems can not be well integrated in principle. They can only be partly integrated and coordinated. A need to question the level of integration of managementsystems is very important as in scientific discourse as in practice. It is important to mark, that the number of organizations, that seek to optimize management processes by implementing the integrated management systems is rapidly increasing in Lithuania, too. It shows that benefit associated with integration of management systems is apprehensible in Lithuania. Advantages of integrated management systems can certainly become even stronger if scientists and practicians join their forces in search of methods of organizational management development.Research limitations. The research limitations related to a lack of integrated

  18. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  19. System dynamics model of taxi management in metropolises: Economic and environmental implications for Beijing.

    Science.gov (United States)

    Wang, Hao; Zhang, Kai; Chen, Junhua; Wang, Zhifeng; Li, Guijun; Yang, Yuqi

    2018-05-01

    Taxis are an important component of urban passenger transport. Research on the daily dispatching of taxis and the utility of governmental management is important for the improvement of passenger travel, taxi driver income and environmental impacts. However, urban taxi management is a complex and dynamic system that is affected by many factors, and positive/negative feedback relationships and nonlinear interactions exist between each subsystem and variable. Therefore, conventional research methods can hardly depict its characteristics comprehensively. To bridge this gap, this paper develops a system dynamics model of urban taxi management, in which the empty-loaded rate and total demand are selected as key factors affecting taxi dispatching, and the impacts of taxi fares on driver income and travel demand are taken into account. After the validation of the model, taxi operations data derived from a prior analysis of origin-destination data of Beijing taxis are used as input for the model to simulate the taxi market in Beijing. Finally, economic and environmental implications are provided for the government to optimise policies on taxi management. Copyright © 2018 Elsevier Ltd. All rights reserved.

  20. Is variation management included in regional healthcare governance systems? Some proposals from Italy.

    Science.gov (United States)

    Nuti, Sabina; Seghieri, Chiara

    2014-01-01

    The Italian National Health System, which follows a Beveridge model, provides universal healthcare coverage through general taxation. Universal coverage provides uniform healthcare access to citizens and is the characteristic usually considered the added value of a welfare system financed by tax revenues. Nonetheless, wide differences in practice patterns, health outcomes and regional usages of resources that cannot be justified by differences in patient needs have been demonstrated to exist. Beginning with the experience of the health care system of the Tuscany region (Italy), this study describes the first steps of a long-term approach to proactively address the issue of geographic variation in healthcare. In particular, the study highlights how the unwarranted variation management has been addressed in a region with a high degree of managerial control over the delivery of health care and a consolidated performance evaluation system, by first, considering it a high priority objective and then by actively integrating it into the regional planning and control mechanism. The implications of this study can be useful to policy makers, professionals and managers, and will contribute to the understanding of how the management of variation can be implemented with performance measurements and financial incentives. Copyright © 2013 The Authors. Published by Elsevier Ireland Ltd.. All rights reserved.