WorldWideScience

Sample records for rich-1 upgrade project

  1. The COMPASS RICH-1 detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Colantoni, M.L.; Panzieri, D. [Univ E Piemonte, Alessandria (Italy); Joosten, R.; Naehle, O. [Univ Bonn, Helmholtz Inst Strahlen and Kernphys, D-5300 Bonn (Germany); Kolosov, V.N. [CERN, European Org Nucl Res, CH-1211 Geneva (Switzerland); Eyrich, W.; Lehmann, A.; Schroeder, W.; Teufel, A. [Univ Erlangen Nurnberg, Inst Phys, D-8520 Erlangen (Germany); Fischer, H.; Hagemann, R.; Heinsius, F.H.; Konigsmann, K.; Mutter, A.; Nerling, F.; Schill, C.; Wollny, H. [Univ Freiburg, Inst Phys, Freiburg (Germany); Kramer, D.; Polak, J.; Sulc, M.; Svec, M. [Tech Univ Liberec, Liberec (Czech Republic); Silva, L. [LIP, P-1000 Lisbon (Portugal); Von Harrach, D. [Johannes Gutenberg Univ Mainz, Inst Kernphys, D-6500 Mainz (Germany); Angerer, H.; Gerassimov, S.; Ketzer, B.; Konorov, I.; Mann, A.; Paul, S. [Tech Univ Munich, Dept Phys, D-8046 Garching (Germany); Finger, M.; Finger, M. Jr.; Slunecka, M.; Steiger, L. [Joint Inst Nucl Res Dubna, Dubna, (Russian Federation); Finger, M.; Finger, M. Jr.; Slunecka, M.; Steiger, L. [Charles Univ Prague, Prague (Czech Republic); Abbon, P.; Dafni, T.; Delagnes, E.; Deschamps, H.; Kunne, F.; Magnon, A.; Neyret, D.; Panebianco, S.; Rebourgeard, P.; Robinet, F. [CEA Saclay, DSM, DAPNIA, F-91191 Gif Sur Yvette (France); Alekseev, M.; Busso, L.; Chiosso, M.; Costa, S.; Dibiase, N.; Faso, D.; Ferrero, A.; Maggiora, A. [Univ Turin, Turin (Italy); Alekseev, M.; Busso, L.; Chiosso, M.; Costa, S.; Dibiase, N.; Faso, D.; Ferrero, A.; Maggiora, A. [Ist Nazl Fis Nucl, Sez Torino, I-10125 Turin, (Italy); Apollonio, M.; Birsa, R.; Bradamante, F.; Bressan, A.; Ciliberti, P.; Torre, S. Dalla; Diaz, V.; Duic, V.; Giorgi, M.; Gobbo, B.; Levorato, S.; Martin, A.; Menon, G.; Pagano, P.; Pesaro, G.; Rocco, E.; Schiavon, P.; Sozzi, F.; Tessarotto, F. [Univ Trieste, Trieste (Italy); Apollonio, M.; Birsa, R.; Bradamante, F.; Bressan, A.; Ciliberti, P.; Torre, S. Dalla; Diaz, V.; Duic, V.; Giorgi, M.; Gobbo, B.; Levorato, S.; Martin, A. [and others

    2008-07-01

    The COMPASS experiment at CERN provides hadron identification in a wide momentum range employing a large size gaseous Ring Imaging Cherenkov detector (RICH). The presence of large uncorrelated background in the COMPASS environment was limiting the efficiency of COMPASS RICH-1 in the very forward regime. A major upgrade of RICH-1 required a new technique for Cherenkov photon detection at count rates of several 10{sup 6}/s per channel in the central detector part, and a read-out system allowing for trigger rates of up to 100 kHz. To cope with these requirements, the photon detectors of the central region have been replaced with a fast photon detection system described here, while, in the peripheral regions, the existing multi-wire proportional chambers with CsI photo-cathodes have been equipped with a new read-out system based on APV preamplifiers and flash ADC chips. The new system consists of multi-anode photo-multiplier tubes (MAPMTs) coupled to individual fused silica lens telescopes, and fast read-out electronics based on the MAD4 amplifier-discriminator and the dead-time free F1 TDC chip. The project was completely designed and implemented in less than two years: The upgraded detector is in operation since the 2006 CERN SPS run. We present the photon detection design, constructive aspects and test studies to characterise the single photon response of the MAPMTs coupled to the read-out system as well as the detector performance based on the 2006 data. (authors)

  2. The COMPASS RICH-1 detector upgrade

    CERN Document Server

    Abbon, P; Angerer, H; Apollonio, M; Birsa, R; Bordalo, P; Bradamante, F; Bressan, A; Busso, L; Chiosso, M; Ciliberti, P; Colantoni, M L; Costa, S; Dalla Torre, S; Dafni, T; Delagnes, E; Deschamps, H; Díaz, V; Dibiase, N; Duic, V; Eyrich, W; Faso, D; Ferrero, A; Finger, M; Finger, M Jr; Fischer, H; Gerassimov, S; Giorgi, M; Gobbo, B; Hagemann, R; Von Harrach, D; Heinsius, F H; Joosten, R; Ketzer, B; Königsmann, K C; Kolosov, V N; Konorov, I; Kramer, Daniel; Kunne, F; Lehmann, A; Levorato, S; Maggiora, A; Magnon, A; Mann, A; Martin, A; Menon, G; Mutter, A; Nähle, O; Nerling, F; Neyret, D; Pagano, P; Panebianco, S; Panzieri, D; Paul, S; Pesaro, G; Polak, J; Rebourgeard, P; Robinet, F; Rocco, E; Schiavon, P; Schill, C; Schröder, W; Silva, L; Slunecka, M; Sozzi, F; Steiger, L; Sulc, M; Svec, M; Tessarotto, F; Teufel, A; Wollny, H

    2008-01-01

    The COMPASS experiment at CERN provides hadron identification in a wide momentum range employing a large size gaseous Ring Imaging CHerenkov detector (RICH). The presence of large uncorrelated background in the COMPASS environment was limiting the efficiency of COMPASS RICH-1 in the very forward regime. A major upgrade of RICH-1 required a new technique for Cherenkov photon detection at count rates of several 10$^{6}$/s per channel in the central detector part, and a read-out system allowing for trigger rates of up to 100 kHz. To cope with these requirements, the photon detectors of the central region have been replaced with a fast photon detection system described here, while, in the peripheral regions, the existing multi-wire proportional chambers with CsI photo-cathodes have been equipped with a new read-out system based on APV preamplifiers and flash ADC chips. The new system consists of multi-anode photomultiplier tubes (MAPMTs) coupled to individual fused silica lens telescopes, and fast read-out electr...

  3. LHCb Upgraded RICH 1 Engineering Design Review Report

    CERN Document Server

    Adinolfi, Marco; Petridis, Konstantinos; Rademacker, Jonas; Garsed, Philip John; Wotton, Stephen; Cardinale, Roberta; Petrolini, Alessandro; Clark, David Edward; Egede, Ulrik; Mccann, Michael Andrew; Patel, Mitesh; Savidge, Trevor Edward; Websdale, David; Brock, Matthew; Harnew, Neville; Tacon, M; Benettoni, Massimo; Brummitt, Amanda Jayne; Easo, Sajan; Papanestis, Antonis; Ricciardi, Stefania; Wilson, Fergus; D'ambrosio, Carmelo; Frei, Christoph; He, jibo; Piedigrossi, Didier

    2016-01-01

    During the Long Shutdown 2 of the LHC, the LHCb collaboration will replace the upstream Ring Imaging Cherenkov detector (RICH 1). The magnetic shield of the current RICH 1 will be modified, new spherical and plane mirrors will be installed and a new gas enclosure will be manufactured. New photon detectors (multianode photomultiplier tubes) will be used and these, together with their readout electronics, require a new mechanical support system. This document describes the new optical arrangement of RICH 1, its engineering design, installation and alignment. A summary of the project schedule and institute responsibilities is provided.

  4. Optical telescopes for COMPASS RICH1 up-grade

    CERN Document Server

    Sulc, M; Alekseev, M; Angerer, H; Appolonio, M; Birsa, R; Bordalo, P; Bradamante, F; Bressan, A; Busso, L; Chiosso, V M; Ciliberti, P; Colantoni, M L; Costa, S; Dibiase, N; Dafni, T; Dalla Torre, S; Diaz, V; Duic, V; Delagnes, E; Deschamps, H; Eyrich, W; Faso, D; Ferrero, A; Finger, M; Finger, M Jr; Fischer, H; Gerassimov, S; Giorgi, M; Gobbo, B; Hagemann, R; von Harrach, D; Heinsius, F H; Joosten, R; Ketzer, B; Königsmann, K; Kolosov, V N; Konorov, I; Kramer, D; Kunne, F; Levorato, S; Maggiora, A; Magnon, A; Mann, A; Martin, A; Menon, G; Mutter, A; Nähle, O; Neyret, D; Nerling, F; Pagano, P; Paul, S; Panebianco, S; Panzieri, D; Pesaro, G; Pizzolotto, C; Polak, J; Rebourgeard, P; Rocco, E; Robinet, F; Schiavon, P; Schill, C; Schoenmeier, P; Silva, L; Slunecka, M; Steiger, L; Sozzi, F; Svec, M; Tessarotto, F; Teufel, A; Wollny, H

    2006-01-01

    The central photon detection area of the Ring Imaging Cherenkov detector at COMPASS, a particle physics experiment at CERN SPS dedicated to hadron physics, has been upgraded from the previous system formed by wire chambers with CsI layers to a very fast UV extended multi anode photo multiplier tube array (MAPMT), including 576 tubes. The active area covered by the MAPMTs is 7.3 times smaller than the one previously equipped with CsI photocathodes, so 576 optical concentrators transforming the image from the old system focal plane to the new photocathode plane were needed. The telescope system formed by two fused silica lenses was designed, produced and assembled. The first prismatic plano-convex field lens is placed in the focal plane of the RICH mirrors. The second condenser lens is off centered and tilted and has one aspherical surface. All lenses have antireflection coating.

  5. THGEM-based photon detectors for the upgrade of COMPASS RICH-1

    Energy Technology Data Exchange (ETDEWEB)

    Alexeev, M.; Birsa, R. [INFN, Sezione di Trieste, Trieste (Italy); Bradamante, F.; Bressan, A. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Büchele, M. [Universität Freiburg, Physikalisches Institut, Freiburg (Germany); Chiosso, M. [INFN, Sezione di Torino and University of Torino, Torino (Italy); Ciliberti, P. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Dalla Torre, S.; Dasgupta, S. [INFN, Sezione di Trieste, Trieste (Italy); Denisov, O. [INFN, Sezione di Torino, Torino (Italy); Duic, V. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Finger, M.; Finger, M. [Charles University, Prague, Czech Republic and JINR, Dubna (Russian Federation); Fischer, H. [Universität Freiburg, Physikalisches Institut, Freiburg (Germany); Giorgi, M. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Gobbo, B.; Gregori, M. [INFN, Sezione di Trieste, Trieste (Italy); Herrmann, F.; Königsmann, K. [Universität Freiburg, Physikalisches Institut, Freiburg (Germany); Levorato, S. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); and others

    2013-12-21

    New Cherenkov photon detectors are being developed for the upgrade of COMPASS RICH-1. The detectors are based on THGEMs, arranged in a three layer architecture, with a CsI film on the first layer acting as a reflective photocathode. The response of THGEMs with various geometries under different conditions has been studied and photon detector prototypes have been built, tested in laboratory and operated during test beam runs providing a typical gain of 10{sup 5} and a time resolution of better than 10 ns. A photon detector prototype with 300×300 mm{sup 2} active area, operated at the CERN PS T10 test beam in November 2012, has confirmed the validity of this novel technology and has allowed further studies of the detector response. -- Highlights: •The COMPASS THGEM R and D team has performed systematic studies and parameter optimization for THGEMs to be used in RICH applications. •A triple-THGEM photon detector with 300×300 mm{sup 2} active area has been successfully tested at the CERN PS T10 test-beam. •A photon detector prototype based on coupling THGEM and Micromegas has provided encouraging results in laboratory tests. •For the upgrade of COMPASS RICH-1 a set of THGEM-based photon detectors will be produced.

  6. Superhilac upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Feinberg, B.; Brown, I.G.

    1985-05-01

    This project will increase the uranium output of the Bevalac heavy-ion facility from the currently available 10/sup 7/ to 5 x 10/sup 7/ ions/pulse, allowing accurate Lamb shift measurements to be made in U/sup 90 +/ and U/sup 91 +/ with important applications to the testing of quantum electrodynamics and the development of an x-ray laser. The injected beam intensity will be increased to make better use of the 10emA output space-charge limit of the Wideroe linac. Components will include a new high current MEtal Vapor Vacuum Arc (MEVVA) ion source along with an improved high current, high voltage Cockcroft-Walton power supply to handle the increased beam current. The Low Energy Beam Transport (LEBT) line will be upgraded with additional focusing to manage the increased space-charge forces and with an improved vacuum to reduce charge exchange losses. Finally, the phase matching between the 23MHz Wideroe linac and the 70MHz Alvarez linac will be improved by the addition of the appropriate buncher cavities. Physics design is underway and detailed engineering is scheduled to begin in October 1985, with installation slated for the 1986 summer shutdown.

  7. Cyclotron Institute Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Clark, Henry [Texas A& M University; Yennello, Sherry [Texas A& M University; Tribble, Robert [Texas A& M University

    2014-08-26

    The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

  8. PF-AR upgrading project

    CERN Document Server

    Kasuga, T

    2002-01-01

    The upgrading project of the dedicated pulse X-ray source PF-AR has been completed by the end of the 2001 fiscal year. Machine commissioning exclusively using the injector linac was successfully accomplished in the beginning of January 2002. After fine tuning of the machine and cleaning of the vacuum system with the beams from the middle of January to the middle of March, routine operation for users has begun in April. The historical details, commissioning and results of the project are reported. (author)

  9. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  10. Status of the Cyclotron Institute Upgrade Project

    Science.gov (United States)

    Melconian, Dan

    2016-09-01

    The Texas A&M University Re-accelerated EXotics (T-REX) project, an upgrade to the Cyclotron Institute, will provide high-quality re-accelerated secondary beams of a unique energy range and the ability to provide primary beams to two experiments concurrently. The upgrade is nearing completion of its three major tasks: re-commissioning of the existing K150 cyclotron; construction of light- and heavy-ion guide transport systems; and charge-boosting the K150 RIB for re-acceleration using the K500 cyclotron. The light-ion guide transport system will utilize the high intensity (>= 10 μ A) proton beam from the K150 to produce rare ions via fusion-evapouration reactions or proton-induced fission fragments. These ions will be transported to an ECR charge breeder prior to injection in the K500. The heavy-ion guide will use deep inelastic, transfer and fragmentation reactions using the up to 25 MeV/u primary beams from the K150. The products will be separated by a superconducting solenoid and collected in a large gas-catcher, after which a multi-RFQ system will transport the RIB to any of: the charge-breeder and K500; the TAMU Penning Trap beamline; or an MR-TOF for beam analysis. The status of the T-REX upgrade and an overview of its capabilities will be presented Supported by DOE Grant Number DE-FG03-93ER40773 and the Robert A. Welch Foundation Grant Number H-A-0098.

  11. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  12. LHC Injectors Upgrade (LIU) Project at CERN

    CERN Document Server

    Shaposhnikova, Elena; Damerau, Heiko; Funken, Anne; Gilardoni, Simone; Goddard, Brennan; Hanke, Klaus; Kobzeva, Lelyzaveta; Lombardi, Alessandra; Manglunki, Django; Mataguez, Simon; Meddahi, Malika; Mikulec, Bettina; Rumolo, Giovanni; Scrivens, Richard; Vretenar, Maurizio

    2016-01-01

    A massive improvement program of the LHC injector chain is presently being conducted under the LIU project. For the proton chain, this includes the replacement of Linac2 with Linac4 as well as all necessary upgrades to the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS) and Super Proton Synchrotron (SPS), aimed at producing beams with the challenging High Luminosity LHC (HL-LHC) parameters. Regarding the heavy ions, plans to improve the performance of Linac3 and the Low Energy Ion Ring (LEIR) are also pursued under the general LIU program. The full LHC injection chain returned to operation after Long Shutdown 1, with extended beam studies taking place in Run 2. A general project Cost and Schedule Review also took place in March 2015, and several dedicated LIU project reviews were held to address issues awaiting pending decisions. In view of these developments, 2014 and 2015 have been key years to define a number of important aspects of the final LIU path. This paper will describe the reviewed LI...

  13. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  14. Recovery Act. Tapoco project. Cheoah upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tran, Paul [Alcoa Inc., Alcoa Center, PA (United States)

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  15. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  16. UPGRADES

    CERN Multimedia

    Didier Contardo

    2012-01-01

      The CMS Upgrade Programme is making good progress on the LS1 and Phase 1 projects, in the planning for Phase 2. The construction of the ME4/2 muon chambers to be installed during LS1 has started and the two first CSC production chambers have been fully qualified. The three muon groups have recently established a set of milestones towards the completion of their project, that will be integrated in the detailed planning and scheduling for the shutdown work established by Technical Coordination. The project to replace the photo-detectors in the HF and HO calorimeters is also well advanced and at the validation stage. The operation of an HF slice with new multi-anode PMTs and back-end electronics has already been demonstrated in 2012. For the Phase 1 data-taking, as discussed in the Chamonix workshop, it is likely that the LHC performance will exceed the nominal luminosity and pile-up before the second shutdown, still scheduled in 2018. The collaboration is therefore pursuing a strategy to upgrade ...

  17. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  18. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    The three post-LS1 Phase 1 Upgrade projects (the L1-Trigger, Pixel Tracker, and HCAL) are all making excellent progress and are transitioning from the prototype to the execution phase. Meanwhile plans are developing for Phase 2, a major Upgrade programme targeting the third long shutdown, LS3. News on Phase 1 is included under the respective projects; we only provide a brief summary here. Phase 1 The plan for the L1 Trigger relies on the installation during the present shutdown of optical splitting for the Trigger input signals. This will allow the new Trigger system to be brought online and fully commissioned during beam operation in 2015, while CMS relies on the existing legacy Trigger for physics. Once fully commissioned the experiment can switch over to the new Trigger, which will provide greatly improved performance at high event pile-up, by 2016. System tests of the splitter system, and of the new architecture of the calorimeter trigger were very successful, and the work in LS1 is on-track. Prototype ...

  19. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2012-01-01

      Good progress is being made on the projects that will be installed during LS1. CSC chamber production for ME4/2 is progressing at a rate of four chambers per month, with 25 built so far, and the new electronics for ME1/1 is undergoing a pre-production integration testing. For the RPC chambers, gap production is underway with first deliveries to the chamber assembly sites at CERN and Ghent. The third site at Mumbai will begin production next month. For the PMT replacement in the forward hadron calorimeters (HF), the 1728 PMTs are all characterised and ready to be installed. Testing of the electronics boards is going well. Preparations to replace the HPDs in the outer calorimeter (HO) with SiPMs are also on-track. All components are at CERN and burn-in of the new front-end electronics is proceeding. There are three major upgrade projects targeting the period from LS1 through LS2: a new pixel detector, upgraded photo-detectors and electronics for HCAL, and development of a new L1 Trigger. The new ...

  20. The SPEAR3 Upgrade Project at SLAC

    Energy Technology Data Exchange (ETDEWEB)

    LeCocq, C.

    2004-11-01

    A major upgrade of an existing synchrotron light source at SLAC was completed in December 2003. A new machine called SPEAR3 will operate at 3 GeV with a current of 500 mA. Presently it is fully operational at 100 mA. From an alignment perspective the primary goal was to fiducialize and position newly manufactured magnets and vacuum chambers in the ring to better than 250 {micro}m globally. A critical complication was to recreate the old position of the orbital beam path in the new ring so that some existing tangential beamlines could be preserved. This paper will cover the survey and alignment techniques and results of this new ring.

  1. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

      LS1 and Phase 1 The detector projects targeting LS1 are progressing well, and a fully integrated schedule developed by Technical Coordination includes installation milestones and a detailed work-plan. The first chambers of the RPC system were produced and are being qualified. Production will ramp up this year to a rate of 20 chambers per month. 32 chambers of the CSC system have been fabricated for the ME4/2 CSC stations, and production proceeds at a rate of 4 per month. The new ME1/1 Front-End Board is in production and the off-detector electronics integration tests are ongoing. The new Theta Trigger Boards for the DT readout production is started and the relocation of the Sector Collector boards with new Optical Links as been successfully tested. All the components for the upgrade of the Forward Hadron Calorimeter PMTs have been received at CERN and assemblies are being qualified. The situation is similar for the Hadron Outer Calorimeter new SiPMs and readout modules. Three projects are plan...

  2. Guangxi Shanglin Aluminum Plant cross-regional technical upgrade project(phase 1)put into operation

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    <正>The project(Phase 1)of cross-regional techni- cal upgrade of the aluminum plant of Guangxi Shanglin Nannan Industrial Co.was completed and put into operation on June 8,2007.The plant is a cross-regional technical upgrade pro- ject of Nanning Aluminum Plant,featuring the integration of coal,electricity and aluminum.

  3. Updates on Projections of Physics Reach with the Upgraded CMS Detector for High Luminosity LHC

    CERN Document Server

    CMS Collaboration

    2016-01-01

    This document contains updates on projections of physics reach with the upgraded CMS detector for HL-LHC. Selected measurements in Higgs Physics, Top Physics, Heavy Flavor physics, Searches for Dark Matter and new Heavy particles highlighting the performance of the planned upgrades of the CMS detector. The projections take into account the effects of high pileup conditions and detector performance, based on the CMS Phase II Technical Proposal (CMS-TDR-15-002). Some of the studies are performed using the Delphes fast simulation of the upgraded CMS detector.

  4. Upgrades to the LHC Injection and Beam Dumping Systems for the HL-LHC Project

    CERN Document Server

    Uythoven, Jan; Goddard, Brennan; Hrivnak, Jan; Lechner, Anton; Maciariello, Fausto; Mereghetti, Alessio; Perillo Marcone, Antonio; Vittal Shetty, N; Shetty, Nikhil Vittal; Steele, Genevieve

    2014-01-01

    The HL-LHC project will push the performance of the LHC injection and beam dumping systems towards new limits. This paper describes the systems affected and presents the new beam parameters for these systems. It also describes the studies to be performed to determine which sub-components of these systems need to be upgraded to fulfil the new HL-LHC requirements. The results from the preliminary upgrade studies for the injection absorbers TDI are presented.

  5. Fast photon detection for COMPASS RICH-1

    CERN Document Server

    Abbon, P; Angerer, H; Apollonio, M; Birsa, R; Bordalo, P; Bradamante, Franco; Bressan, A; Busso, L; Chiosso, M; Ciliberti, P; Colantoni, M L; Costa, S; Dibiase, N; Dafni, T; Dalla Torre, S; Díaz, V; Duic, V; Delagnes, E; Deschamps, H; Eyrich, W; Faso, D; Ferrero, A; Finger, M; Finger, J M; Fischer, H; Gerassimov, S; Giorgi, M; Gobbo, B; Von Harrach, D; Heinsius, F H; Joosten, R; Ketzer, B; Königsmann, K C; Kolosov, V N; Konorov, I; Kramer, Daniel; Kunne, Fabienne; Levorato, S; Maggiora, A; Magnon, A; Mann, A; Martin, A; Menon, G; Mutter, A; Nähle, O; Neyret, D; Nerling, F; Pagano, P; Paul, S; Panebianco, S; Panzieri, D; Pesaro, G; Pizzolotto, C; Polak, J; Rebourgeard, P; Rocco, E; Robinet, F; Schiavon, Paolo; Schill, C; Schoenmeier, P; Silva, L; Slunecka, M; Steiger, L; Sozzi, F; Sulc, M; Svec, M; Tessarotto, F; Teufel, A; Wollny, H

    2007-01-01

    A fast photon detection system has been built and assembled for the upgrade of COMPASS RICH-1. The system is based on multianode photomultipliers coupled to fused silica lenses to collect the light from a larger surface and to guide it to the photocathode, preserving the position information. The emphasis is on the fast response and high rate capability of the detectors and the associated electronics. The photon detection system is now ready and it will be employed in the 2006 COMPASS data taking. We report about the system design and construction.

  6. Community Organisations, Misiones and Integration of Barrios of Caracas: The Case of the CAMEBA Upgrading Project

    NARCIS (Netherlands)

    A. Ayala Alemán (Alonzo)

    2009-01-01

    textabstractThe paper is an attempt to analyse the likely effects of compensatory social programmes such as Misiones Bolivarianas on community organisations in barrios and their participation in the planning and implementation of barrio upgrading projects, based on the case of the CAMEBA project in

  7. Xinjiang Xinxin Mining Starts to Work on a 10,O00-ton Nickel-smelting Technological Upgrading Project

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>In October,Xinjiang Xinxin Mining Industry Co.,Ltd.started to work on a 10,000-ton nickel-smelting technological upgrading project at the Kalatongke copper nickel ore in Fuyun County.The technological upgrading project for 10,000-ton nickel-smelting operations that

  8. 77 FR 26275 - Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS

    Science.gov (United States)

    2012-05-03

    ... Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS AGENCY...``''sts for long-term transmission service. During the NOS process, utilities and power generators (including wind generators and power marketers) requested the use of BPA's transmission system to...

  9. ATLAS 10 GHz electron cyclotron resonance ion source upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Moehs, D. P. [Argonne National Laboratory, Physics Division, Argonne, Illinois 60439 (United States); Vondrasek, R. [Argonne National Laboratory, Physics Division, Argonne, Illinois 60439 (United States); Pardo, R. C. [Argonne National Laboratory, Physics Division, Argonne, Illinois 60439 (United States); Xie, D. [Berkeley Ion Equipment Inc., Santa Clara, California 95054 (United States)

    2000-02-01

    A major upgrade of the first ATLAS 10 GHz electron cyclotron resonance (ECR) ion source, which began operations in 1987, is in the planning and procurement phase. The new design will convert the old two-stage source into a single-stage source with an electron donor disk and high gradient magnetic field that preserves radial access for solid material feeds and pumping of the plasma chamber. The new magnetic-field profile allows for the possibility of a second ECR zone at a frequency of 14 GHz. An open hexapole configuration, using a high-energy-product Nd-Fe-B magnet material, having an inner diameter of 8.8 cm and pole gaps of 2.4 cm, has been adopted. Models indicate that the field strengths at the chamber wall, 4 cm in radius, will be 9.3 kG along the magnet poles and 5.6 kG along the pole gaps. The individual magnet bars will be housed in austenitic stainless steel, allowing the magnet housing within the aluminum plasma chamber to be used as a water channel for direct cooling of the magnets. Eight solenoid coils from the existing ECR will be enclosed in an iron yoke to produce the axial mirror. Based on a current of 500 A, the final model predicts a minimum B field of 3 kG with injection and extraction mirror ratios of 4.4 and 2.9, respectively. (c) 2000 American Institute of Physics.

  10. ATLAS 10 GHz ECR ions source upgrade project.

    Energy Technology Data Exchange (ETDEWEB)

    Moehs, D. P.; Pardo, R. C.; Vondrasek, R.; Xie, D.

    1999-08-10

    A major upgrade of the first ATLAS 10 GHz ECR ion source, which began operations in 1987, is in the planning and procurement phase. The new design will convert the old two-stage source into a single-stage source with an electron donor disk and high gradient magnetic field that preserves radial access for solid material feeds and pumping of the plasma chamber. The new magnetic field profile allows for the possibility of a second ECR zone at a frequency of 14 GHz. An open hexapole configuration, using a high energy-product Nd-Fe-B magnet material, having an inner diameter of 8.8 cm and pole gaps of 2.4 cm has been adopted. Models indicate that the field strengths at the chamber wall, 4 cm in radius, will be 9.3 kG along the magnet poles and 5.6 kG along the pole gaps. The individual magnet bars will be housed in austenitic stainless steel allowing the magnet housing within the aluminum plasma chamber to be used as a water channel for direct cooling of the magnets. Eight solenoid coils from the existing ECR will be enclosed in an iron yoke to produce the axial mirror. Based on a current of 500 A, the final model predicts a minimum B field of 3 kG with injection and extraction mirror ratios of 4.4 and 2.9 respectively.

  11. ATLAS 10 GHz electron cyclotron resonance ion source upgrade project

    CERN Document Server

    Moehs, D P; Pardo, R C; Xie, D

    2000-01-01

    A major upgrade of the first ATLAS 10 GHz electron cyclotron resonance (ECR) ion source, which began operations in 1987, is in the planning and procurement phase. The new design will convert the old two-stage source into a single-stage source with an electron donor disk and high gradient magnetic field that preserves radial access for solid material feeds and pumping of the plasma chamber. The new magnetic-field profile allows for the possibility of a second ECR zone at a frequency of 14 GHz. An open hexapole configuration, using a high-energy-product Nd-Fe-B magnet material, having an inner diameter of 8.8 cm and pole gaps of 2.4 cm, has been adopted. Models indicate that the field strengths at the chamber wall, 4 cm in radius, will be 9.3 kG along the magnet poles and 5.6 kG along the pole gaps. The individual magnet bars will be housed in austenitic stainless steel, allowing the magnet housing within the aluminum plasma chamber to be used as a water channel for direct cooling of the magnets. Eight solenoid...

  12. Implementation plan for the Operations Center Upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed.

  13. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hays, W.H.

    1998-05-19

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  14. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hays, W.H.

    1998-05-19

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  15. Achievements of the ATLAS Upgrade Planar Pixel Sensors R&D Project

    CERN Document Server

    Nellist, C

    2015-01-01

    In the framework of the HL-LHC upgrade, the ATLAS experiment plans to introduce an all-silicon inner tracker to cope with the elevated occupancy. To investigate the suitability of pixel sensors using the proven planar technology for the upgraded tracker, the ATLAS Planar Pixel Sensor R&D Project (PPS) was established comprising 19 institutes and more than 90 scientists. The paper provides an overview of the research and development project and highlights accomplishments, among them: beam test results with planar sensors up to innermost layer fluences (> 10^16 n_eq cm^2); measurements obtained with irradiated thin edgeless n-in-p pixel assemblies; recent studies of the SCP technique to obtain almost active edges by postprocessing already existing sensors based on scribing, cleaving and edge passivation; an update on prototyping efforts for large areas: sensor design improvements and concepts for low-cost hybridisation; comparison between Secondary Ion Mass Spectrometry results and TCAD simulations. Togethe...

  16. The nuMOIRCS project: detector upgrade overview and early commissioning results

    Science.gov (United States)

    Walawender, Josh; Wung, Matthew; Fabricius, Maximilian; Tanaka, Ichi; Arimoto, Nobuo; Cook, David; Elms, Brian; Hashiba, Yasuhito; Hu, Yen-Sang; Iwata, Ikuru; Nishimura, Tetsuo; Omata, Koji; Takato, Naruhisa; Wang, Shiang-Yu; Weber, Mark

    2016-08-01

    In 2014 and 2015 the Multi-Object InfraRed Camera and Spectrograph (MOIRCS) instrument at the Subaru Telescope on Maunakea is underwent a significant modernization and upgrade project. We upgraded the two Hawaii2 detectors to Hawaii2-RG models, modernized the cryogenic temperature control system, and rewrote much of the instrument control software. The detector upgrade replaced the Hawaii2 detectors which use the Tohoku University Focal Plane Array Controller (TUFPAC) electronics with Hawaii2-RG detectors using SIDECAR ASIC (a fully integrated FPA controller system-on-a-chip) and a SAM interface card. We achieved an improvement in read noise by a factor of about 2 with this detector and electronics upgrade. The cryogenic temperature control upgrade focused on modernizing the components and making the procedures for warm up and cool down of the instrument safer. We have moved PID control loops out of the instrument control software and into Lakeshore model 336 cryogenic temperature controllers and have added interlocks on the warming systems to prevent overheating of the instrument. Much of the instrument control software has also been re-written. This was necessitated by the different interface to the detector electronics (ASIC and SAM vs. TUFPAC) and by the desire to modernize the interface to the telescope control software which has been updated to Subaru's "Gen2" system since the time of MOIRCS construction and first light. The new software is also designed to increase reliability of operation of the instrument, decrease overheads, and be easier for night time operators and support astronomers to use.

  17. Current Lead Design for the Accelerator Project for Upgrade of LHC

    Energy Technology Data Exchange (ETDEWEB)

    Brandt, Jeffrey S.; Cheban, Sergey; Feher, Sandor; Kaducak, Marc; Nobrega, Fred; Peterson, Tom

    2010-01-01

    The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. In collaboration with Brookhaven National Laboratory, Fermilab is developing sub-systems for an upgrade of the LHC final focus magnet systems. A concept of main and auxiliary helium flow was developed that allows the superconductor to remain cold while the lead body warms up to prevent upper section frosting. The auxiliary flow will subsequently cool the thermal shields of the feed box and the transmission line cryostats. A thermal analysis of the current lead central heat exchange section was performed using analytic and FEA techniques. A method of remote soldering was developed that allows the current leads to be field replaceable. The remote solder joint was designed to be made without flux or additional solder, and able to be remade up to ten full cycles. A method of upper section attachment was developed that allows high pressure sealing of the helium volume. Test fixtures for both remote soldering and upper section attachment for the 13 kA lead were produced. The cooling concept, thermal analyses, and test results from both remote soldering and upper section attachment fixtures are presented.

  18. Advanced conceptual design report: T Plant secondary containment and leak detection upgrades. Project W-259

    Energy Technology Data Exchange (ETDEWEB)

    Hookfin, J.D.

    1995-05-12

    The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades.

  19. Progress of projection computed tomography by upgrading of the beamline 37XU of SPring-8

    Science.gov (United States)

    Terada, Yasuko; Suzuki, Yoshio; Uesugi, Kentaro; Miura, Keiko

    2016-01-01

    Beamline 37XU at SPring-8 has been upgraded for nano-focusing applications. The length of the beamline has been extended to 80 m. By utilizing this length, the beamline has advantages for experiments such as X-ray focusing, X-ray microscopic imaging and X-ray computed tomography. Projection computed tomography measurements were carried out at experimental hutch 3 located 80 m from the light source. CT images of a microcapsule have been successfully obtained with a wide X-ray energy range.

  20. Progress of projection computed tomography by upgrading of the beamline 37XU of SPring-8

    Energy Technology Data Exchange (ETDEWEB)

    Terada, Yasuko, E-mail: yterada@spring8.or.jp; Suzuki, Yoshio; Uesugi, Kentaro; Miura, Keiko [Japan Synchrotron Radiation Research Institute, SPring-8, 1-1-1 Koto, Sayo, Hyogo 679-5198 (Japan)

    2016-01-28

    Beamline 37XU at SPring-8 has been upgraded for nano-focusing applications. The length of the beamline has been extended to 80 m. By utilizing this length, the beamline has advantages for experiments such as X-ray focusing, X-ray microscopic imaging and X-ray computed tomography. Projection computed tomography measurements were carried out at experimental hutch 3 located 80 m from the light source. CT images of a microcapsule have been successfully obtained with a wide X-ray energy range.

  1. A project of upgrading the operations control system of the Hungarian electric power system

    Energy Technology Data Exchange (ETDEWEB)

    Oroszki, L.; Kovacs, G.

    1998-07-01

    About 20 years ago an on-line EMS/SCADA system replaced the previously used off-line control system in the Hungarian power system. The system that has met the technological requirements of that time now became obsolete. A project started in 1995 by the Hungarian Power Companies, Ltd. (MVM Rt.), the regional utility companies and the power plant companies, with funding through a World Bank loan to cover international procurement, aims to upgrade that system into a complex, intelligent and state-of-the-art process control system. The new hierarchical system will rely on a distributed computer network structure, universally accepted hardware/software interface standards and communication protocols and use hardware platform independent software. The automatic generation control, performed from the National Dispatch Centre, will have expanded functionality, the most important single item of this will be the inclusion of automatic voltage/var control. The upgrading project includes the replacement of the substation and power plant remote terminal units and the installation of a telecommunication network to provide this telecontrol system with the necessary communications links. The supply contracts for both the master station and the remote terminal unit parts were awarded to the winners of open international bidding processes. In the project implementation MVM has the overall responsibility and works with assistance from international and Hungarian engineering firms.

  2. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    Directory of Open Access Journals (Sweden)

    Leontsinis S.

    2016-01-01

    Full Text Available The ATLAS collaboration has chosen the Micromegas technology along with the small-strip Thin Gap Chambers for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel upgrade project. It will employ eight layers of Micromegas and eight layers of small-strip Thin Gap Chambers per wheel. The New Small Wheel project requires fully efficient Micromegas chambers, able to cope with the maximum expected rate of 15 kHz/cm2 featuring single plane spatial resolution better than 100 μm. The Micromegas detectors will cover a total active area of ~ 1200 m2 and will be operated in a moderate magnetic field (≤ 0.3 T. Moreover, together with their precise tracking capability the New Small Wheel Micromegas chambers will contribute to the ATLAS Level-1 trigger system. Several studies have been performed on small (10 × 10 cm2 and medium (1 × 0.5 m2 size prototypes using medium (1 − 5 GeV/c and high momentum (120 – 150 GeV/c hadron beams at CERN. A brief overview of the results obtained is presented.

  3. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    CERN Document Server

    Ntekas, Konstantinos; The ATLAS collaboration

    2015-01-01

    Micromegas, an abbreviation for Micro MEsh Gaseous Structure (MM), is a robust detector with excellent spatial resolution and high rate capability. An $R\\&D$ activity, called Muon ATLAS MicroMegas Activity (MAMMA), was initiated in 2007 in order to explore the potential of the MM technology for use in the ATLAS experiment. After several years of prototyping and testing, the ATLAS collaboration has chosen the MM technology along with the small-strip Thin Gap Chambers (sTGC) for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel (NSW) upgrade project. It will employ eight layers of MM and eight layers of sTGC detectors per wheel. The NSW project requires fully efficient MM chambers, able to cope with the maximum expected rate of $15\\,\\mathrm{kHz/cm^2}$ featuring single plane spatial resolution better than $100\\,\\mu\\mathrm{m}$. The MM detectors will cover a total active area of $\\sim1200\\,\\mathrm{m^2}$ and will be operated in a moderate magnetic field with intens...

  4. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    Science.gov (United States)

    Leontsinis, S.; Ntekas, K.

    2016-11-01

    The ATLAS collaboration has chosen the Micromegas technology along with the small-strip Thin Gap Chambers for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel upgrade project. It will employ eight layers of Micromegas and eight layers of small-strip Thin Gap Chambers per wheel. The New Small Wheel project requires fully efficient Micromegas chambers, able to cope with the maximum expected rate of 15 kHz/cm2 featuring single plane spatial resolution better than 100 μm. The Micromegas detectors will cover a total active area of 1200 m2 and will be operated in a moderate magnetic field (≤ 0.3 T). Moreover, together with their precise tracking capability the New Small Wheel Micromegas chambers will contribute to the ATLAS Level-1 trigger system. Several studies have been performed on small (10 × 10 cm2) and medium (1 × 0.5 m2) size prototypes using medium (1 - 5 GeV/c) and high momentum (120 - 150 GeV/c) hadron beams at CERN. A brief overview of the results obtained is presented.

  5. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Rhea, T.A.; Rucker, T.L. [Science Applications International Corp., Oak Ridge, TN (United States); Stafford, M.W. [NUS Corp., Aiken, SC (US)

    1990-09-28

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical.

  6. Conceptual design report, 219-S secondary containment upgrade, Project W-178

    Energy Technology Data Exchange (ETDEWEB)

    Beyer, J.J. [Kaiser Engineers Hanford Co., Richland, WA (United States)

    1993-05-01

    The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000.

  7. Research and Development on the Storage Ring Vacuum System for the APS Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Stillwell, B.; Brajuskovic, B.; Carter, J.; Cease, H.; Lill, R.; Navrotski, G.; Noonan, J.; Suthar, K.; Walters, D.; Wiemerslage, G.; Zientek, J.; Sangroula, M.

    2016-01-01

    A number of research and development activities are underway at Argonne National Laboratory to build confidence in the designs for the storage ring vacuum system required for the Advanced Photon Source Up-grade project (APS-U) [1]. The predominant technical risks are: excessive residual gas pressures during operation; insufficient beam position monitor stability; excessive beam impedance; excessive heating by induced electrical surface currents; and insufficient operational reliability. Present efforts to mitigate these risks include: building and evaluating mockup assemblies; performing mechanical testing of chamber weld joints; developing computational tools; investigating design alternatives; and performing electrical bench measurements. Status of these activities and some of what has been learned to date will be shared.

  8. Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Doose, C.; Dejus, R.; Jaski, M.; Jansma, W.; Collins, J.; Donnelly, A.; Liu, J.; Cease, H.; Decker, G.; Jain, A.; DiMarco, J.

    2017-06-01

    Extensive prototyping of storage ring magnets is ongoing at the Advanced Photon Source (APS) in support of the APS Multi-Bend Achromat (MBA) upgrade project (APS-U) [1]. As part of the R&D activities four quadrupole magnets with slightly different geometries and pole tip materials, and one sextupole magnet with vanadium permendur (VP) pole tips were designed, built and tested. Magnets were measured individually using a rotating coil and a Hall probe for detailed mapping of the magnetic field. Magnets were then assembled and aligned relative to each other on a steel support plate and concrete plinth using precision machined surfaces to gain experience with the alignment method chosen for the APS-U storage ring magnets. The required alignment of magnets on a common support structure is 30 μm rms. Measurements of magnetic field quality, strength and magnet alignment after subjecting the magnets and assemblies to different tests are presented.

  9. Recent results of the ATLAS upgrade Planar Pixel Sensors R&D project

    Science.gov (United States)

    Forshaw, Dean

    2013-12-01

    To extend the physics reach of the LHC, upgrades to the accelerator are planned which will increase the integrated annual luminosity by a factor of 5-10. This will increase the occupancy and the radiation damage of the inner trackers. To cope with the elevated occupancy, the ATLAS experiment plans to introduce an all silicon inner tracker for High Luminosity LHC (HL-LHC) operation. With silicon, the occupancy can be adjusted by using the appropriate pitch for the pixels/micro-strips. Constraints due to high radiation damage mean that only sensors with electrode configuration designed to read out the electron signal (n-in-p and n-in-n) are considered. To investigate the suitability of planar pixel sensors (PPS) for the ATLAS tracker upgrade, a dedicated R&D project was established, with 17 institutes and more than 80 scientists. The main focuses of research are the performance of planar pixel sensors after the high fluences expected during HL-LHC operation, the optimisation of the detector and module production technologies for cost reduction to enable the instrumentation of large volumes and the reduction of the inactive areas needed for electrical insulation of the sensitive region from the cut edge of the sensors. An overview of recent accomplishments of the PPS (Planar Pixel Sensors) R&D project is given. The performance in terms of charge collection and tracking efficiency, evaluated with radioactive sources in the laboratory and from beam tests, is presented. Sensors with different thicknesses (ranging from 75 to 300 μm) were irradiated to several fluences up to 2 ×1016neqcm-2 to study the effect of varying thickness on the radiation hardness. The significant progresses made towards the reduction of the edge distance are reported.

  10. Hartmann test of the COMPASS RICH-1 optical telescopes

    CERN Document Server

    Polak, J; Alekseev, M; Angerer, H; Apollonio, M; Birsa, R; Bordalo, P; Bradamante, F; Bressan, A; Busso, L; Chiosso, V M; Ciliberti, P; Colantoni, M L; Costa, S; Dibiase, N; Dafni, T; Dalla Torre, S; Diaz, V; Duic, V; Delagnes, E; Deschamps, H; Eyrich, W; Faso, D; Ferrero, A; Finger, M; Finger, M Jr; Fischer, H; Gerassimov, S; Giorgi, M; Gobbo, B; Hagemann, R; von Harrach, D; Heinsius, F H; Joosten, R; Ketzer, B; Königsmann, K; Kolosov, V N; Konorov, I; Kramer, D; Kunne, F; Levorato, S; Maggiora, A; Magnon, A; Mann, A; Martin, A; Rebourgeard, P; Mutter, A; Nähle, O; Neyret, D; Nerling, F; Pagano, P; Paul, S; Panebianco, S; Panzieri, D; Pesaro, G; Pizzolotto, C; Menon, G; Rocco, E; Robinet, F; Schiavon, P; Schill, C; Schoenmeier, P; Silva, L; Slunecka, M; Steiger, L; Sozzi, F; Sulc, M; Svec, M; Tessarotto, F; Teufel, A; Wollny, H

    2008-01-01

    The central region of COMPASS RICH-1 has been equipped with a new photon detection system based on MultiAnode PhotoMultiplier Tubes (MAPMT). The Cherenkov photons are focused by an array of 576 fused silica telescopes onto 576 MAPMTs. The quality and positioning of all optical components have been tested by Hartmann method. The validation procedures are described. The quality of the optical concentrators was checked and alignment corrections were made. The upgraded detector showed excellent performances during 2006 data taking.

  11. Long term project in ASDEX upgrade: Implementation of ferritic steel as in vessel wall

    Energy Technology Data Exchange (ETDEWEB)

    Zammuto, I., E-mail: irene.zammuto@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, D-85740 Garching (Germany); Giannone, L. [Max-Planck-Institut für Plasmaphysik, D-85740 Garching (Germany); Houben, A. [Institute of Energy and Climate Research, Plasma Physics, Forschungszentrum Jülich GmbH, Trilateral Euregio Cluster, 52425 Jülich (Germany); Herrmann, A.; Kallenbach, A. [Max-Planck-Institut für Plasmaphysik, D-85740 Garching (Germany)

    2015-10-15

    A long term project is started at the ASDEX Upgrade (AUG) tokamak aimed at the exploration of the compatibility of reduced activation ferritic/martensitic steel (RAFM) with fusion devices. The topic is oriented toward the preparation of future experiments such as ITER with its test blanket modules and DEMO with its first wall designed with RAFM. The goal of the project is to gather experience with ferromagnetic materials inside the vacuum vessel, dealing with magnetic perturbations, both in plasma and magnetic probes, and facing up the additional magnetic forces acting on the supporting structures. The project envisages a stepwise replacement of the traditional graphite tiles with ferritic steel. For the time being, the main AUG actor is the inner heat shield (IHS), but further development can be imagined in the future. Since 2013, two of the 15 tile rows of the IHS have been replaced with ferritic steel and since now the experimental campaign has not suffered any particular problem related to the perturbation field induced by the steel tiles, as predicted by the calculation. In the present paper, the preliminary study accomplished for the first phase for the evaluation of the forces and magnetic perturbation is reported, together with the further calculations required for the extension of the steel wall.

  12. The Academic Bilingual and Career Upgrading System (Project ABACUS). Final Evaluation Report, 1992-93. OER Report.

    Science.gov (United States)

    Law, Tim

    The Academic Bilingual and Career Upgrading System (Project ABACUS) was a federally-funded program in its fourth year at two Brooklyn and one Queens (New York) high schools. The program served 475 limited-English-speaking students who were native speakers of Chinese, Korean, and Spanish. Students received instruction in English as a second…

  13. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  14. LHCb RICH1 Engineering Design Review Report

    CERN Document Server

    Brook, N; Metlica, F; Muir, A; Phillips, A; Buckley, A; Gibson, V; Harrison, K; Jones, C R; Katvars, S G; Lazzeroni, C; Storey, J; Ward, CP; Wotton, S; Alemi, M; Arnabaldi, C; Bellunato, T F; Calvi, M; Matteuzzi, C; Musy, M; Negri, P; Perego, D L; Pessina, G; Chamonal, R; Eisenhardt, S; Lawrence, J; McCarron, J; Muheim, F; Playfer, S; Walker, A; Cuneo, S; Fontanelli, F; Gracco, Valerio; Mini, G; Musico, P; Petrolini, A; Sannino, M; Bates, A; MacGregor, A; O'Shea, V; Parkes, C; Paterson, S; Petrie, D; Pickford, A; Rahman, M; Soler, F; Allebone, L; Barber, J H; Cameron, W; Clark, D; Dornan, Peter John; Duane, A; Egede, U; Hallam, R; Howard, A; Plackett, R; Price, D; Savidge, T; Vidal-Sitjes, G; Websdale, D M; Adinolfi, M; Bibby, J H; Cioffi, C; Gligorov, Vladimir V; Harnew, N; Harris, F; McArthur, I A; Newby, C; Ottewell, B; Rademacker, J; Senanayake, R; Somerville, L P; Soroko, A; Smale, N J; Topp-Jørgensen, S; Wilkinson, G; Yang, S; Benayoun, M; Khmelnikov, V A; Obraztsov, V F; Densham, C J; Easo, S; Franek, B; Kuznetsov, G; Loveridge, P W; Morrow, D; Morris, JV; Papanestis, A; Patrick, G N; Woodward, M L; Aglieri-Rinella, G; Albrecht, A; Braem, André; Campbell, M; D'Ambrosio, C; Forty, R W; Frei, C; Gys, Thierry; Jamet, O; Kanaya, N; Losasso, M; Moritz, M; Patel, M; Piedigrossi, D; Snoeys, W; Ullaland, O; Van Lysebetten, A; Wyllie, K

    2005-01-01

    This document describes the concepts of the engineering design to be adopted for the upstream Ring Imaging Cherenkov detector (RICH1) of the reoptimized LHCb detector. Our aim is to ensure that coherent solutions for the engineering design and integration for all components of RICH1 are available, before proceeding with the detailed design of these components.

  15. Fast Photon Detection for Particle Identification with COMPASS RICH-1

    CERN Document Server

    Abbon, P; Angerer, H; Apollonio, M; Birsa, R; Bordalo, P; Bradamante, Franco; Bressan, A; Busso, L; Chiosso, M; Ciliberti, P; Colantoni, M L; Costa, S; Dalla Torre, S; Dafni, T; Delagnes, E; Deschamps, H; Díaz, V; Dibiase, N; Duic, V; Eyrich, W; Faso, D; Ferrero, A; Finger, M; Fischer, H; Gerassimov, S; Giorgi, M; Gobbo, B; Hagemann, R; Von Harrach, D; Heinsius, F H; Horikawa, S; Joosten, R; Ketzer, B; Königsmann, K C; Kolosov, V N; Konorov, I; Kramer, Daniel; Kunne, Fabienne; Lehmann, A; Levorato, S; Maggiora, A; Magnon, A; Mann, A; Martin, A; Menon, G; Mutter, A; Nahle, O; Nerling, F; Neyret, D; Pagano, P; Panebianco, S; Panzieri, D; Paul, S; Pesaro, G; Polak, J; Rebourgeard, P; Robinet, F; Rocco, E; Schiavon, Paolo; Schill, C; Schroder, W; Silva, L; Slunecka, M; Sozzi, F; Steiger, L; Sulc, M; Svec, M; Tessarotto, F; Teufel, A; Wollny, H; COMPASS RICH Upgrade Group

    2007-01-01

    Particle identification at high rates is an important challenge for many current and future high-energy physics experiments. The upgrade of the COMPASS RICH-1 detector requires a new technique for Cherenkov photon detection at count rates of several $10^6$ per channel in the central detector region, and a read-out system allowing for trigger rates of up to 100 kHz. To cope with these requirements, the photon detectors in the central region have been replaced with the detection system described in this paper. In the peripheral regions, the existing multi-wire proportional chambers with CsI photocathode are now read out via a new system employing APV pre-amplifiers and flash ADC chips. The new detection system consists of multi-anode photomultiplier tubes (MAPMT) and fast read-out electronics based on the MAD4 discriminator and the F1-TDC chip. The RICH-1 is in operation in its upgraded version for the 2006 CERN SPS run. We present the photon detection design, constructive aspects and the first Cherenkov light ...

  16. The experience of building and operating COMPASS RICH-1

    CERN Document Server

    Birsa, R; Rocco, E; Schiavon, P; Kramer, D; Schroder, W; Dafni, T; Tessarotto, F; Bressan, A; Schill, C; Deschamps, H; Mann, A; Sozzi, F; Colantoni, M; Dibiase, N; Abbon, P; Svec, M; Delagnes, E; Ketzer, B; Joosten, R; Steiger, L; Ciliberti, P; Konigsmann, K; Maggiora, A; Kolosov, V N; Giorgi, M; Sbrizzai, G; Nahle, O; Kunne, F; Sulc, M; Teufel, A; Paul, S; Neyret, D; Rebourgeard, P; Menon, G; Dalla Torre, S; Hagemann, R; Slunecka, M; Martin, A; Magnon, A; Takekawa, S; Finger, M; Bradamante, F; Heinsius, F H; Nerling, F; Gerassimov, S; Polak, J; Alexeev, M; Pizzolotto, C; Chiosso, M; Gobbo, B; Angerer, H; Denisov, O; Ferrero, A; Baum, G; Franco, C; Lehmann, A; Bordalo, P; Duic, V; Konorov, I; Mutter, A; Levorato, S; Robinet, F; von Harrach, D; Fischer, H; Schoenmeier, P; Pesaro, G; Wollny, H; Panzieri, D

    2011-01-01

    COMPASS RICH-1 is a large size gaseous Imaging Cherenkov Detector providing hadron identification in the range from 3 to 55 GeV/c, in the wide acceptance spectrometer of the COMPASS Experiment at CERN SPS. It uses a 3 m long C(4)F(10) radiator, a 21 m(2) large VUV mirror surface and two kinds of photon detectors: MAPMTs and MWPCs with CsI photocathodes, covering a total of 5.5 m(2). It is in operation since 2002 and its performance has increased in time thanks to progressive optimization and mostly to a major upgrade which was implemented in 2006. The main characteristics of COMPASS RICH-1 components are described and some specific aspects related to the radiator gas system, the mirror alignment, the MWPC electrical stability and the readout electronics are discussed. Some key features of the event reconstruction and the PID analysis are presented together with results from the COMPASS RICH-1 performance characterization study. (C) 2010 Elsevier B.V. All rights reserved.

  17. Recent Results of the ATLAS Upgrade Planar Pixel Sensors R&D Project

    CERN Document Server

    Weigell, Philipp

    2013-01-01

    To cope with the higher occupancy and radiation damage at the HL-LHC also the LHC experiments will be upgraded. The ATLAS Planar Pixel Sensor R&D Project (PPS) is an international collaboration of 17 institutions and more than 80 scientists, exploring the feasibility of employing planar pixel sensors for this scenario. Depending on the radius, different pixel concepts are investigated using laboratory and beam test measurements. At small radii the extreme radiation environment and strong space constraints are addressed with very thin pixel sensors active thickness in the range of (75-150) mum, and the development of slim as well as active edges. At larger radii the main challenge is the cost reduction to allow for instrumenting the large area of (7-10) m^2. To reach this goal the pixel productions are being transferred to 6 inch production lines. Additionally, investigated are more cost-efficient and industrialised interconnection techniques as well as the n-in-p technology, which, being a single-sided pr...

  18. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  19. Prototype application for the control and debugging of CMS upgrade projects

    CERN Document Server

    Mills-Howell, Dominic

    2016-01-01

    Following the high-luminosity upgrades of the LHC, many subsystems of the CMS experiment require upgrading and others are using the LHC shutdowns as an opportunity to improve performance. The upgrades, themselves, have served to highlight the exigency to attack problems that were previously unaddressed. One such problem is the need for a tool that allows the users to easily monitor, debug, and test custom hardware. Such a tool could be abstracted to work, in theory, with various hardware devices. In addition to having the added benefit of being able to support future hardware, and maintaining parallel operations with the remaining control software.

  20. The Los Alamos National Laboratory Chemistry and Metallurgy Research Facility upgrades project - A model for waste minimization

    Energy Technology Data Exchange (ETDEWEB)

    Burns, M.L.; Durrer, R.E.; Kennicott, M.A.

    1996-07-01

    The Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently undergoing a major, multi-year construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D&D) job and are identical to the requirements of any of several upgrades projects anticipated for LANL and other Department of Energy (DOE) sites. For these reasons the CMR Upgrades Project is seen as an ideal model facility - to test the application, and measure the success of - waste minimization techniques which could be brought to bear on any of the similar projects. The purpose of this paper will be to discuss the past, present, and anticipated waste minimization applications at the facility and will focus on the development and execution of the project`s {open_quotes}Waste Minimization/Pollution Prevention Strategic Plan.{close_quotes}

  1. Study of the influence of design parameters of MAPS for the ALICE ITS Upgrade: Project Report

    CERN Document Server

    Munteanu, Laura-Iuliana

    2016-01-01

    This report illustrates the results of measurements performed on various MAPS chips used during the R&D phase for the ALICE ITS Upgrade. It lists the influence that pixel design parameters have on the performance of the chips.

  2. Recent results of the ATLAS Upgrade Planar Pixel Sensors R&D Project

    CERN Document Server

    AUTHOR|(CDS)2073610

    2011-01-01

    The ATLAS detector has to undergo significant updates at the end of the current decade, in order to withstand the increased occupancy and radiation damage that will be produced by the high-luminosity upgrade of the Large Hadron Collider. In this presentation we give an overview of the recent accomplishments of the R&D activity on the planar pixel sensors for the ATLAS Inner Detector upgrade.

  3. Completion of the ATLAS ECR-I ion source upgrade project.

    Energy Technology Data Exchange (ETDEWEB)

    Moehs, D. P.; Vondrasek, R.; Scott, R. H.; Pardo, R. C., Montgomery, J. M.; Physics

    2002-02-01

    A new 10 GHz electron cyclotron resonance ion source (ECRIS) has been constructed and commissioned for the ATLAS accelerator. This new source replaces the original ATLAS ECRIS that has been in operations since 1987. The goal of this upgrade project was to significantly improve the source performance while maintaining maximum operational flexibility for solid material feeds. The new source design includes a large magnetic-field gradient, aluminum plasma chamber, and bias disk following modern ECRIS design concepts. Eight solenoid coils from the original source along with a new iron yoke form the magnetic mirror. Hall Probe measurements showed the axial B field to be within 1% of the POISSON design model calculated at 400 A per coil. The injection and extraction mirror ratios are approximately 4.4 and 2.9, respectively, with a minimum field of 3.0 kG. A new aluminum plasma chamber houses the NdFeB hexapole magnets, which are encased in austenitic stainless steel to allow for direct water cooling. An open hexapole configuration provides six radial access ports, 1.7 cm x 4.1 cm, to the plasma chamber for solid material feeds and vacuum pumping at an estimated rate of 20 l/s per radial port. Measurements of the hexapole field near the plasma chamber wall, 4 cm in radius, were within 13% of the designed B field of 9.3 and 5.7 kG along the poles and pole gaps, respectively. The first plasma in the new source was obtained on October 10, 2000. Already it has exceeded the best {sup 16}O{sup 6+} beam current obtained from the original ECR-I by a factor of roughly 2.3, achieving 140 e {micro}A with a biased disk. The source is back in regular operation and ATLAS experiment runs have been performed with He, O, Ar, Kr, Ni, and Zr.

  4. Fast Photon Detection for COMPASS RICH1

    CERN Document Server

    Abbon, P; Angerer, H; Apollonio, M; Birsa, R; Bordalo, P; Bradamante, F; Bressan, A; Busso, L; Chiosso, M; Ciliberti, P; Colantoni, M L; Costa, S; Dibiase, N; Dafni, T; Dalla Torre, S; Diaz, V; Duic, v; Delagnes, E; Deschamps, H; Eyrich, W; Faso, D; Ferrero, A; Finger, M; Finger, M Jr; Fischer, H; Gerassimov, S; Giorgi, M; Gobbo, B; Hagemann, R; Von Harrach, D; Heinsius, F H; Joosten, R; Ketzer, B; Königsmann, K; Kolosov, V N; Konorov, I; Kramer, D; Kunne, F; Levorato, S; Maggiora, A; Magnon, A; Mann, A; Martin, A; Menon, G; Mutter, A; Nähle, O; Neyret, D; Nerling, F; Pagano, P; Paul, S; Panebianco, S; Panzieri, D; Pesaro, G; Pizzolotto, C; Polak, J; Rebourgeard, P; Rocco, E; Robinet, F; Schiavon, P; Schill, C; Schoenmeier, P; Silva, L; Slunecka, M; Steiger, L; Sozzi, F; Sulc, M; Svec, M; Tessarotto, F; Teufel, A; Wollny, H

    2006-01-01

    The new photon detection system for COMPASS RICH-1 has been designed to cope with the demanding requests of operation at high beam intensity and at high trigger rates. The detection technique in the central region of RICH-1 has been changed with a system based on multianode photomultipliers coupled to individual fused silica lens telescopes and to a fast, almost dead time free readout system based on the MAD-4 amplifier-discriminator and the F1 TDC-chip. The new photon detection system design and construction are described, as well as its first response in the experiment.

  5. Testbeam studies of pre-prototype silicon strip sensors for the LHCb UT upgrade project

    CERN Document Server

    Abba, Andrea; Blusk, Steven; Britton, Thomas; Davis, Adam; Dendek, Adam; Dey, Biplab; Ely, Scott; Evans, T.; Fu, Jinlin; Gandini, Paolo; Lionetto, Federica; Manning, Peter Michael; Meadows, Brian; Mountain, Raymond; Neri, Nicola; Petruzzo, Marco; Pikies, Malgorzata; Skwarnicki, Tomasz; Szumlak, Tomasz; Wang, Jianchun

    2016-01-01

    The LHCb experiment is preparing for a major upgrade in 2018-2019. One of the key components in the upgrade is a new silicon tracker situated upstream of the analysis magnet of the experiment. The Upstream Tracker (UT) will consist of four planes of silicon strip detectors, with each plane covering an area of about 2m$^2$. An important consideration of these detectors is their performance after they have been exposed to a large radiation dose. In this article we present test beam results of pre-prototype n-in-p and p-in-n sensors that have been irradiated with doses up to 23.3 MRad.

  6. Progress on the Design of the Storage Ring Vacuum System for the Advanced Photon Source Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Stillwell, B.; Billett, B.; Brajuskovic, B.; Carter, J.; Kirkus, E.; Lale, M.; Lerch, J.; Noonan, J.; O' Neill, M.; Rocke, B.; Suthar, K.; Walters, D.; Wiemerslage, G.; Zientek, J.

    2017-06-20

    Recent work on the design of the storage ring vacuum system for the Advanced Photon Source Upgrade project (APS-U) includes: revising the vacuum system design to accommodate a new lattice with reverse bend magnets, modifying the designs of vacuum chambers in the FODO sections for more intense incident synchrotron radiation power, modifying the design of rf-shielding bellows liners for better performance and reliability, modifying photon absorber designs to make better use of available space, and integrated planning of components needed in the injection, extraction and rf cavity straight sections. An overview of progress in these areas is presented.

  7. Radiation hardness of two CMOS prototypes for the ATLAS HL-LHC upgrade project

    CERN Document Server

    Huffman, B T; Arndt, K; Bates, R; Benoit, M; Di Bello, F; Blue, A; Bortoletto, D; Buckland, M; Buttar, C; Caragiulo, P; Das, D; Dopke, J; Dragone, A; Ehrler, F; Fadeyev, V; Galloway, Z; Grabas, H; Gregor, I M; Grenier, P; Grillo, A; Hoeferkamp, M; Hommels, L B A; John, J; Kanisauskas, K; Kenney, C; Kramberger, J; Liang, Z; Mandic, I; Maneuski, D; Martinez-McKinney, F; McMahon, S; Meng, L; Mikuž, M; Muenstermann, D; Nickerson, R; Peric, I; Phillips, P; Plackett, R; Rubbo, F; Segal, J; Seidel, S; Seiden, A; Shipsey, I; Song, W; Stanitzki, M; Su, D; Tamma, C; Turchetta, R; Vigani, L; olk, J; Wang, R; Warren, M; Wilson, F; Worm, S; Xiu, Q; Zhang, J; Zhu, H

    2016-01-01

    The LHC luminosity upgrade, known as the High Luminosity LHC (HL-LHC), will require the replacement of the existing silicon strip tracker and the transistion radiation tracker. Although a baseline design for this tracker exists the ATLAS collaboration and other non-ATLAS groups are exploring the feasibility of using CMOS Monolithic Active Pixel Sensors (MAPS) which would be arranged in a strip-like fashion and would take advantage of the service and support structure already being developed for the upgrade. Two test devices made with theAMSH35 process (a High voltage or HV CMOS process) have been subjected to various radiation environments and have performed well. The results of these tests are presented in this paper.

  8. Upgrade of the radio frequency quadrupole cooler and buncher for the HIE-ISOLDE project

    CERN Document Server

    Babcock, Carla

    2013-01-01

    The upgrade to the ISOLDE facility, HIE-ISOLDE, will include an upgrade to the RFQCB (radio frequency quadrupole cooler and buncher), the focus of which will be fixing the problems of alignment with the current machine, improving the integrity of the vacuum system, stabilizing the internal gas pressure, and the changes associated with a new position. The beam passage inside the RFQCB has been simulated with an independent code to highlight the importance of the internal gas pressure, to motivate design changes in the new RFQCB and to explain ways to improve the performance of the current machine. The suspected misalignment of ISCOOL has been quantified, and, using a simulation of ions passing through the external injection electrodes, the effect of the misalignment on machine acceptance has been detailed. Plans for the future RFQCB test stand and HIE-ISOLDE installation have been outlined. (C) 2013 Elsevier B.V. All rights reserved.

  9. ATLAS UPGRADES

    CERN Document Server

    Lacasta, C; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. In parallel the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for ...

  10. Upgrade project and plans for the ATLAS detector and first level trigger.

    CERN Document Server

    della Volpe, D; The ATLAS collaboration

    2012-01-01

    In the coming years, the LHC complex will be upgraded to extend the physics potential of the experiments. The average luminosity will be increased by a factor 5 to 10 above the original design one. The planned upgrades require, among other detector and DAQ system improvements, a significant higher selectivity of the trigger system, to cope with the increased radiation level and particle rates. In this paper we describe the changes to the ATLAS detector and its trigger system currently under study. The calorimetry--‐based trigger detectors will improve their selectivity by benefiting from the increased granularity available at the trigger level, which will allow for a higher energy resolution. In the muon detector, the momentum resolution of the trigger can be improved by using the precision muon tracking detectors, the Monitored Drift Tuber chambers (MDT). An MDT--‐based trigger scheme has been developed and validated, based on new radiation--‐hard readout chips currently under development. The use of t...

  11. Upgrade project and plans for the ATLAS detector and first level trigger

    CERN Document Server

    della Volpe, D; The ATLAS collaboration

    2012-01-01

    In the coming years, the LHC complex will be upgraded to extend the physics potential of the experiments. The average luminosity will be increased by a factor 5 to 10 above the original design one. The planned upgrades require, among other detector and DAQ system improvements, a significant higher selectivity of the trigger system, to cope with the increased radiation level and particle rates. In this paper we describe the changes to the ATLAS detector and its trigger system currently under study. The calorimetry-­‐based trigger detectors will improve their selectivity by benefiting from the increased granularity available at the trigger level, which will allow for a higher energy resolution. In the muon detector, the momentum resolution of the trigger can be improved by using the precision muon tracking detectors, the Monitored Drift Tuber chambers (MDT). An MDT-­‐based trigger scheme has been developed and validated, based on new radiation-­‐hard readout chips currently under development. The use o...

  12. The upgrade of the forward Muon Spectrometer of the ATLAS Experiment: the New Small Wheel project

    CERN Document Server

    Iengo, Paolo; The ATLAS collaboration

    2017-01-01

    The current innermost stations of the ATLAS endcap muon tracking system (the Small Wheel) will be upgraded in 2019 and 2020 to retain the good precision tracking and trigger capabilities in the high background environment expected with the upcoming luminosity increase of the LHC. The upgraded detector will consist of eight layers each of Resistive Micromegas (MM) and small-strip Thin Gap Chambers (sTGC) together forming the ATLAS New Small Wheels. Large area sTGC's up to 2 m2 in size and totaling an active area each of 1200 m2 will be employed for fast and precise triggering. The required spatial resolution of about 100 μm will allow the Level-1 trigger track segments to be reconstructed with an angular resolution of approximately 1mrad. The precision cathode plane has strips with a 3.2mm pitch for precision readout and the cathode plane on the other side has pads to produce a 3-out-of-4 coincidence to identify passage of a track in an sTGC quadruplet, selecting which strips to read-out. The eight layers of ...

  13. Upgrade of the radio frequency quadrupole cooler and buncher for the HIE-ISOLDE project

    Energy Technology Data Exchange (ETDEWEB)

    Babcock, Carla, E-mail: cbabcock@cern.ch; Giles, Tim, E-mail: tgiles@cern.ch

    2013-12-15

    Highlights: • Simulations show pressure inside trap needs to be near 0.1 mbar for optimal emittance. • Misalignment of 0.75 mm measured and corrected for. • Installation in HIE-ISOLDE will require design changes associated with new position -- Abstract: The upgrade to the ISOLDE facility, HIE-ISOLDE, will include an upgrade to the RFQCB (radio frequency quadrupole cooler and buncher), the focus of which will be fixing the problems of alignment with the current machine, improving the integrity of the vacuum system, stabilizing the internal gas pressure, and the changes associated with a new position. The beam passage inside the RFQCB has been simulated with an independent code to highlight the importance of the internal gas pressure, to motivate design changes in the new RFQCB and to explain ways to improve the performance of the current machine. The suspected misalignment of ISCOOL has been quantified, and, using a simulation of ions passing through the external injection electrodes, the effect of the misalignment on machine acceptance has been detailed. Plans for the future RFQCB test stand and HIE-ISOLDE installation have been outlined.

  14. Nb3Sn High Field Magnets for the High Luminosity LHC Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Ambrosio, Giorgio

    2015-06-01

    The High Luminosity upgrade of the Large Hadron Collider at CERN requires a new generation of high field superconducting magnets. High field large aperture quadrupoles (MQXF) are needed for the low-beta triplets close to the ATLAS and CMS detectors, and high field two-in-one dipoles (11 T dipoles) are needed to make room for additional collimation. The MQXF quadrupoles, with a field gradient of 140 T/m in 150 mm aperture, have a peak coil field of 12.1 T at nominal current. The 11 T dipoles, with an aperture of 60 mm, have a peak coil field of 11.6 T at nominal current. Both magnets require Nb3Sn conductor and are the first applications of this superconductor to actual accelerator magnets.

  15. SUPERCONDUCTING LINAC UPGRADE PLAN FOR THE SECOND TARGET STATION PROJECT AT SNS

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sang-Ho [ORNL; Doleans, Marc [ORNL; Galambos, John D [ORNL; Howell, Matthew P [ORNL; Mammosser, John [ORNL

    2015-01-01

    The beam power of the Linac for the Second Target Station (STS) at the Spallation Neutron Source (SNS) will be doubled to 2.8 MW. For the energy upgrade, seven additional cryomodules will be installed in the reserved space at the end of the linac tunnel to produce linac output energy of 1.3 GeV. The cryomodules for STS will have the same physical length but will incorporate some design changes based on the lessons learned from operational experience over the last 10 years and from the high beta spare cryomodule developed in house. The average macro-pulse beam current for the STS will be 38 mA which is about a 40 % increase from the present beam current for 1.4 MW operation. Plans for the new cryomodules and for the existing cryomodules to support higher beam current for the STS are presented in this paper.

  16. Applications of ECH on the DIII-D tokamak and projections for future ECH upgrades

    Directory of Open Access Journals (Sweden)

    Solomon W.M.

    2012-09-01

    Full Text Available Electron Cyclotron Heating and Current Drive plays an important role in the DIII-D program. In high performance discharges EC power contributes greatly to MHD stability, and this is particularly important for discharges with low rotational torque applied, as will be the case for ITER. Off-axis EC current drive also plays a key role in the actualization of steady-state scenarios by supporting the desired current profile. In order to carry out these applications at higher beta and higher field, an upgrade of the EC power to 15 MW is needed, and the best gyrotron frequency for the DIII-D program is 117.5 GHz.

  17. A Simulation of the Front End Signal Digitization for the ATLAS Muon Spectrometer thin RPC trigger upgrade project

    Science.gov (United States)

    Meng, Xiangting; Chapman, John; Levin, Daniel; Dai, Tiesheng; Zhu, Junjie; Zhou, Bing; Um Atlas Group Team

    2016-03-01

    The ATLAS Muon Spectrometer Phase-I (and Phase-II) upgrade includes the BIS78 muon trigger detector project: two sets of eight very thin Resistive Place Chambers (tRPCs) combined with small Monitored Drift Tube (MDT) chambers in the pseudorapidity region 1Phase-I operation, a stringent latency requirement of 43 bunch crossings (1075 ns) is imposed. The latency budget for the front end digitization must be kept to a minimal value, ideally less than 350 ns. We conducted detailed HPTDC latency simulations using the Behavioral Verilog code from the CERN group. We will report the results of these simulations run for the anticipated detector operating environment and for various HPTDC configurations.

  18. Electronics/Robotics Displaced Worker Retraining and Technician Upgrade Training. Ohlone College Investment in People Project 1983-84. Evaluation Report.

    Science.gov (United States)

    Moock, Lynn D.

    An evaluator studied the effectiveness of the displaced worker entry-level and the upgrade components of the electronics/robotics training program. Since the program was a pilot project with attendant trials and errors, a user-focused process of evaluation was selected. Entry-level students, administrators, the counselor, and instructors completed…

  19. Position measurements for the isotope production facility and the switchyard kicker upgrade projects

    Energy Technology Data Exchange (ETDEWEB)

    Gilpatrick, J. D. (John Douglas); Barr, D. S. (Dean S.); O' Hara, J. F. (James F.); Shurter, R. B. (Robert B.); Stettler, M. W. (Matthew W.); Martinez, D. G. (Derwin G.)

    2003-01-01

    The Los Alamos Neutron Science Center (LANSCE) is installing two beam lines to both improve operational tuning and provide new capabilities within the facility. The Isotope Production Facility (IPF) will provide isotopes for medical purposes by using the H' beam spur at 100 MeV and the Switchyard Kicker Upgrade (SYK) will allow the LANSCE 800-MeV H beam to be rapidly switched between various beam lines within the facility. The beam position measurements for both of these beam lines uses a standard micro-stripline beam position monitor (BPM) with both a 50-mm and 75-mm radius. The cable plant is unique in that it unambiguously provides a method of verifying the operation of the complete position measurement. The processing electronics module uses a log ratio technique with error corrections such that it has a dynamic range of -12 dBm to -85 dBm with errors less than 0.15 dB within this range. This paper will describe the primary components of these measurement systems and provide initial data of their operation.

  20. Nb$_3$Sn High Field Magnets for the High Luminosity LHC Upgrade Project

    CERN Document Server

    AUTHOR|(CDS)2075881

    2015-01-01

    The high luminosity upgrade of the Large Hadron Collider at CERN requires a new generation of high field superconducting magnets. High field large aperture quadrupoles (MQXF) are needed for the low-beta triplets close to the ATLAS and CMS detectors, and high field two-in-one dipoles (11-T dipoles) are needed to make room for additional collimation. The MQXF quadrupoles, with a field gradient of 140 T/m in 150 mm aperture, have a peak coil field of 12.1 T at nominal current. The 11-T dipoles, with an aperture of 60 mm, have a peak coil field of 11.6 T at nominal current. Both magnets require Nb3Sn conductor and are the first applications of this superconductor to actual accelerator magnets. Collaboration between the US LARP (LHC Accelerator Research Program) and CERN is developing the MQXF magnets, whereas the 11-T dipole magnets are being developed by CERN and Fermilab. This paper reviews the status of Nb3Sn technology for accelerator magnets, discusses its main challenges, and discusses how the MQXF and 11-T...

  1. Performance of Large Area Micromegas Detectors for the ATLAS Muon Spectrometer Upgrade Project

    CERN Document Server

    Losel, Philipp Jonathan; The ATLAS collaboration; Hertenberger, Ralf; Mueller, Ralph Soeren Peter; Bortfeldt, Jonathan; Flierl, Bernhard Matthias; Zibell, Andre

    2016-01-01

    Four German institutes are building the 32 high-rate capable SM2 Micromegas quadruplets, for the upgrade of the Small Wheels of the ATLAS muon spectrometer. The cathodes and strip-anodes of the m$^2$ in size quadruplets consist of stable honeycomb sandwiches with a requested planarity better than 80 $\\mu$m. The qualification of a full-size SM2 quadruplet, foreseen by ATLAS time schedule for August 2015, will be performed in the Munich Cosmic Ray Measurement Facility (CRMF). Two fully working 4 m$\\times$ 2.2 m ATLAS drift-tube chambers provide muon tracking, a RD51 SRS based data acquisition system provides readout of all 12288 electronic channels using 96 APV25 frontend boards. We report on homogeneity of pulse-height and efficiency and will present measurements of the planarity of the sandwich planes and the positions of the readout-strips. This has been pioneered by studying a $102 \\times 92$ cm$^2$ Micromegas chamber with similar readout pitch in the CRMF using the TPC-like analysis method. At trigger rate...

  2. Performance of Large Area Micromegas Detectors for the ATLAS Muon Spectrometer Upgrade Project

    CERN Document Server

    Losel, Philipp Jonathan; The ATLAS collaboration

    2015-01-01

    Four German institutes are building 32 high-rate capable SM2 Micromegas quadruplets, for the upgrade of the Small Wheels of the ATLAS muon spectrometer. The cathodes and strip-anodes of the 2 m$^2$ quadruplets consist of stable honeycomb sandwiches with a requested planarity better than 80 $\\mu$m. The qualification of full-size SM2 quadruplets will be performed in the Munich Cosmic Ray Measurement Facility (CRMF). Two fully working 4 m $\\times$ 2.2 m ATLAS drift-tube chambers provide muon tracking, a RD51 SRS based data acquisition system provides readout of all 12288 electronic channels using 96 APV25 front-end boards. The goal is to measure the homogeneity of pulse-height and efficiency and to determine the planarity of the sandwich planes and the positions of the readout-strips. This has been pioneered by studying a 102 $\\times$ 92 cm$^2$ Micromegas chamber with similar readout pitch in the CRMF using the TPC-like analysis method. At trigger rates above 100 Hz data taking takes only a few days for sufficie...

  3. Improvements made to the Bruce A upgraders and heavy water cleanup system as part of the Bruce A Units 1 and 2 restart project and commissioning results

    Energy Technology Data Exchange (ETDEWEB)

    Davloor, R., E-mail: ram.davloor@brucepower.com [Bruce Power, Tiverton, Ontario (Canada); Steinberg, G.; Boddy, C. [SNC Lavalin Nuclear, Oakville, Ontario (Canada); Rocci, D. [Aecon Nuclear, Cambridge, Ontario (Canada)

    2013-07-01

    As part of the Bruce A Units 1 and 2 Restart Project, major modifications and maintenance were completed on the heat transport and moderator upgraders and the heavy water cleanup system. This represents the first time that major rehabilitation has been done to such systems in a CANDU nuclear station for the purpose of life extension. Prior to shutdown in 1997, the upgraders and cleanup system significantly underperformed against the stated design. The rehabilitation, which included major design changes and implementation of new systems, resulted in the upgraders exceeding design throughput and making product with quality much better than specified. This paper describes the work done, results from inspections and follow-up, and performance data from commissioning. (author)

  4. Royal Military College of Canada SLOWPOKE-2 facility. Integrated regulating and instrumentation system (SIRCIS) upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Corcoran, W.P.; Nielsen, K.S.; Kelly, D.G.; Weir, R.D. [Royal Military College of Canada (RMCC), Kingston, Ontario (Canada)

    2013-07-01

    The SLOWPOKE-2 Facility at the Royal Military College of Canada has operated the only digitally controlled SLOWPOKE reactor since 2001 (Version 1.0). The present work describes ongoing project development to provide a robust digital reactor control system that is consistent with Aging Management as summarized in the Facility's Life Cycle Management and Maintenance Plan. The project has transitioned from a post-graduate research activity to a comprehensively managed project supported by a team of RMCC professional and technical staff who have delivered an update of the V1.1 system software and hardware implementation that is consistent with best Canadian nuclear industry practice. The challenges associated with the implementation of Version 2.0 in February 2012, the lessons learned from this implementation, and the applications of these lessons to a redesign and rewrite of the RMCC SLOWPOKE-2 digital instrumentation and regulating system (Version 3) are discussed. (author)

  5. Electron-cloud simulation studies for the CERN-PS in the framework of the LHC Injectors Upgrade project

    CERN Document Server

    Rioja Fuentelsaz, Sergio

    The present study aims to provide a consistent picture of the electron cloud effect in the CERN Proton Synchrotron (PS) and to investigate possible future limitations due to the requirements foreseen by the LHC Injectors Upgrade (LIU) project. It consists of a complete simulation survey of the electron cloud build-up in the different beam pipe sections of the ring depending on several controllable beam parameters and vacuum chamber surface properties, covering present and future operation parameters. As the combined function magnets of the accelerator constitute almost the $80\\%$ in length of the ring, the implementation of a new feature for the simulation of any external magnetic field on the PyECLOUD code, made it possible to perform this study. All the results of the simulations are given as a function of the vacuum chamber surface properties in order to deduce them, both locally and globally, when compared with experimental data. In a first step, we characterize locally the maximum possible number of ...

  6. GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-09-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

  7. Operating test report for project W-417, T-plant steam removal upgrade, waste transfer portion

    Energy Technology Data Exchange (ETDEWEB)

    Myers, N.K.

    1997-10-21

    This Operating Test Report (OTR) documents the performance results of the Operating Test Procedure HNF-SD-W417-OTP-001 that provides steps to test the waste transfer system installed in the 221-T Canyon under project W-417. Recent modifications have been performed on the T Plant Rail Car Waste Transfer System. This Operating Test Procedure (OTP) will document the satisfactory operation of the 221-T Rail Car Waste Transfer System modified by project W-417. Project W-417 installed a pump in Tank 5-7 to replace the steam jets used for transferring liquid waste. This testing is required to verify that operational requirements of the modified transfer system have been met. Figure 2 and 3 shows the new and existing system to be tested. The scope of this testing includes the submersible air driven pump operation in Tank 5-7, liquid waste transfer operation from Tank 5-7 to rail car (HO-IOH-3663 or HO-IOH-3664), associated line flushing, and the operation of the flow meter. This testing is designed to demonstrate the satisfactory operation-of the transfer line at normal operating conditions and proper functioning of instruments. Favorable results will support continued use of this system for liquid waste transfer. The Functional Design Criteria for this system requires a transfer flow rate of 40 gallons per minute (GPM). To establish these conditions the pump will be supplied up to 90 psi air pressure from the existing air system routed in the canyon. An air regulator valve will regulate the air pressure. Tank capacity and operating ranges are the following: Tank No. Capacity (gal) Operating Range (gal) 5-7 10,046 0 8040 (80%) Rail car (HO-IOH-3663 HO-IOH-3664) 097219,157 Existing Tank level instrumentation, rail car level detection, and pressure indicators will be utilized for acceptance/rejection Criteria. The flow meter will be verified for accuracy against the Tank 5-7 level indicator. The level indicator is accurate to within 2.2 %. This will be for information only

  8. A Time Projection Chamber for High-Rate Experiments: Towards an Upgrade of the ALICE TPC

    CERN Document Server

    Ketzer, Bernhard

    2013-01-01

    A Time Projection Chamber (TPC) is a powerful detector for 3-dimensional tracking and particle identification for ultra-high multiplicity events. It is the central tracking device of many experiments, e.g. the ALICE experiment at CERN. The necessity of a switching electrostatic gate, which prevents ions produced in the amplification region o MWPCs from entering the drift volume, however, restricts its application to trigger rates of the order of 1 kHz. Charge amplification by Gas Electron Multiplier (GEM) foils instead of proportional wires offers an intrinsic suppression of the ion backflow, although not to the same level as a gating grid. Detailed Monte Carlo simulations have shown that the distortions due to residual space charge from back-drifting ions can be limited to a few cm, and thus can be corrected using standard calibration techniques. A prototype GEM-TPC has been built with the largest active volume to date for a detector of this type. It has been commissioned with cosmics and particle beams at t...

  9. The UKIRT Upgrades Programme

    Science.gov (United States)

    Adamson, Andy; Davies, John; Robson, Ian

    Tim Hawarden presented this paper to the 30th anniversary workshop, just a month before his untimely death. The editors have done their best to convert his talk into this paper, and gratefully acknowledge the assistance of Nick Rees (a member of the Upgrades team, now at Diamond Light Source). Tim's discussion concerned the UKIRT Upgrades Project, which ran through the 1990s and transformed the telescope and made it truly competitive on the world stage for operation into the twenty-first century. The reference list at the end of the paper is comprehensive; some of these are referred to in the paper itself and some are included for completeness only.

  10. ATLAS IBL Pixel Upgrade

    CERN Document Server

    La Rosa, A

    2011-01-01

    The upgrade for ATLAS detector will undergo different phase towards super-LHC. The first upgrade for the Pixel detector will consist of the construction of a new pixel layer which will be installed during the first shutdown of the LHC machine (LHC phase-I upgrade). The new detector, called Insertable B-Layer (IBL), will be inserted between the existing pixel detector and a new (smaller radius) beam-pipe at a radius of 3.3 cm. The IBL will require the development of several new technologies to cope with increase of radiation or pixel occupancy and also to improve the physics performance which will be achieved by reducing the pixel size and of the material budget. Three different promising sensor technologies (planar-Si, 3D-Si and diamond) are currently under investigation for the pixel detector. An overview of the project with particular emphasis on pixel module is presented in this paper

  11. Subsidiary Upgrading?

    DEFF Research Database (Denmark)

    Gammelgaard, Jens; Dörrenbächer, Christoph

    2004-01-01

    AbstractThis study reports the results of interviews with 65 managers in 11 Germanheadquarters and in their 13 Hungarian subsidiaries. We focused on the role of thesubsidiary with regard to market, product and value-adding mandates. Further, weinvestigated whether the Hungarian subsidiaries had e......, ethnocentric behaviours emanating from the headquarters should be includedin future upgrading analyses....

  12. Outlook of COMPASS RICH1 data handling algorithms

    CERN Document Server

    Finger, Miroslav H

    2003-01-01

    COMPASS is a fixed target experiment at the CERN SPS designed to study hadron spectroscopy with hadron beams and hadron structure with polarized muon beams. This paper is aiming to outlook the COMPASS RICH1 data handling algorithms in order to discuss some of the data analysis methods proposed for the RICH2 detector. The need for improvement and testing of COMPASS real data acquisition for better performance in realistic COMPASS environment is elaborated. The experience of more than 5 years of RICH1 software development and improvements oriented mainly on taking into account RICH1 constructive specifics, promises a similar hard work for RICH2 algorithmists. Its first stage is Monte Carlo simulation of RICH2 data. (14 refs).

  13. Monitoring of absolute mirror alignment at COMPASS RICH-1 detector

    NARCIS (Netherlands)

    Alexeev, M.; Birsa, R.; Bradamante, F.; Bressan, A.; Chiosso, M.; Ciliberti, P.; Dalla Torre, S.; Denisov, O.; Duic, V.; Ferrero, A.; Finger, M.; Finger, M.; Gayde, J. Ch; Giorgi, M.; Gobbo, B.; Levorato, S.; Maggiora, A.; Martin, A.; Menon, G.; Panzieri, D.; Pesaro, G.; Polak, J.; Rocco, E.; Sbrizzai, G.; Schiavon, P.; Slunecka, M.; Sozzi, F.; Steiger, L.; Sulc, M.; Takekawa, S.; Tessarotto, F.

    2014-01-01

    The gaseous COMPASS RICH-1 detector uses two spherical mirror surfaces, segmented into 116 individual mirrors, to focus the Cherenkov photons onto the detector plane. Any mirror misalignment directly affects the detector resolution. The on-line Continuous Line Alignment and Monitoring (CLAM) photogr

  14. Urban upgrading and its impact on health: a "quasi-experimental" mixed-methods study protocol for the BH-Viva Project.

    Science.gov (United States)

    Friche, Amélia Augusta de Lima; Dias, Maria Angélica de Salles; Reis, Priscila Brandão Dos; Dias, Cláudia Silva; Caiaffa, Waleska Teixeira

    2015-11-01

    There is little scientific evidence that urban upgrading helps improve health or reduce inequities. This article presents the design for the BH-Viva Project, a "quasi-experimental", multiphase, mixed-methods study with quantitative and qualitative components, proposing an analytical model for monitoring the effects that interventions in the urban environment can have on residents' health in slums in Belo Horizonte, Minas Gerais State, Brazil. A preliminary analysis revealed intra-urban differences in age-specific mortality when comparing areas with and without interventions; the mortality rate from 2002 to 2012 was stable in the "formal city", increased in slums without interventions, and decreased in slums with interventions. BH-Viva represents an effort at advancing methodological issues, providing learning and theoretical backing for urban health research and research methods, allowing their application and extension to other urban contexts.

  15. Gemini Instrument Upgrade Program

    Science.gov (United States)

    Diaz, Ruben; Goodsell, Stephen; Kleinman, Scot

    2016-08-01

    The Gemini Observatory* remains committed to keeping its operational instrumentation competitive and serving the needs of its user community. Currently the observatory operates a 4 instruments + 1 AO system at each site. At Gemini North the GMOS-N, GNIRS, NIFS and NIRI instruments are offered supported by the ALTAIR AO system. In the south, GMOS-S, F-2, GPI and GSAOI are offered instrumentation and GeMS is the provided AO System. This paper reviews our strategy to keep our instrumentation suite competitive, examines both our current funded upgrade projects and our potential future enhancements. We summarize the work done and the results so far obtained within the instrument upgrade program.

  16. Design and Construction of Precision Tooling for Construction of Micromegas Detectors for the ATLAS Small Wheel Upgrade Project in Germany

    CERN Document Server

    Losel, Philipp Jonathan; The ATLAS collaboration; Schaile, Otto; Hertenberger, Ralf; Biebel, Otmar; Bortfeldt, Jonathan; Flierl, Bernhard Matthias

    2016-01-01

    Mechanical precision is a key-aspect of the high-rate capable Micromegas detectors for the upgrade of the Small Wheels of the ATLAS muon spectrometer. 32 SM2 quadruplets will be built by four German institutes with cathodes and strip-anodes made of stable honeycomb sandwiches. To achieve a single plane resolution below $100\\mu m$ the deviation from planarity of a single detector plane must not exceed $80\\mu m$ over the whole active area and the global position of the readout strips has to be within $30\\mu m$ for a single readout-plane of 3 PCB's, as well as between all four planes of a quadruplet. Precision tooling is used for the correct positioning of readout PCB's and readout sandwich planes. For quality control of the planarity of the sandwich planes a laser distance sensor combined with a coordinate measurement system has been developed. Deviation from planarity below 10 $\\mu$m can be easily resolved. We will present key features of the challenging construction procedure to achieve this high level of pre...

  17. ATLAS Upgrade Plans

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000/fb by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new...

  18. Upstream, downstream underground upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Roche, P.

    2008-06-15

    Innovation, technology and research and development activities in the upstream oil sands industry were discussed with particular reference to new methods of upgrading bitumen in reservoirs currently being used by Shell Canada. Methods of refining residues and producing tight gas and oil sands were also discussed. Shell Canada's pilot program is currently being conducted to test the electric heat technology at a cyclic steam project that is currently preparing for significant growth. The pilot project will assess the composition of the product, determine recovery efficiency and identify geomechanical issues in order to commercialize the heaters. The project will potentially produce billions of barrels of light oil if it succeeds. It was concluded that Shell is now also using its proprietary gas-to-liquids (GTL) technology to build the world's first GTL plant in Malaysia. 3 figs.

  19. Fast photon-detection for COMPASS RICH-1

    CERN Document Server

    Chiosso, Michela; Alexeev, M; Angerer, H; Birsa, R; Bordalo, P; Bradamante, F; Bressan, A; Ciliberti, P; Colantoni, M L; Dafni, T; Dalla Torre, S; Delagnes, E; Denisov, O; Deschamps, H; Diaz, V; Dibiase, N; Duic, V; Eyrich, W; Ferrero, A; Finger, M; Finger Jr, M; Fisher, H; Gerassimov, S; Giorgi, M; Gobbo, B; Hagemann, R; von Harrac, D; Heinsius, F H; Joosten, R; Ketzer, B; Königsmann, K; Kolosov, V N; Konorov, I; Kramer, D; Kunne, F; Lehmann, A; Levorato, S; Maggiora, A; Magnon, A; Mann, A; Martin, A; Menon, G; Mutter, A; Nähle, O; Neyret, D; Nerling, F; Panebianco, S; Panzieri, D; Paul, S; Pesaro, G; Pizzolotto, C; Polak, J; Rebourgeard, P; Robinet, P; Rocco, E; Schiavon, P; Schill, C; Schoenmaier, W; Schröder, W; Silva, L; Slunecka, M; Sozzi, F; Steiger, L; Sulc, M; Svec, M; Tessarotto, F; Teufel, A; Wollny, H

    2008-01-01

    A fast photon-detection system for the detector RICH-1 of the COMPASS Experiment at CERN SPS is in operation since the 2006 run. It is based on the use of Multi-Anode Photomultipliers (MAPMTs) coupled to individual fused silica lens telescopes and fast read-out electronics. It has been designed taking into account the high photon flux in the central region of the detector and the high rate requirements of the COMPASS Experiment. We present the photon-detection design and construction, together with its characterization and measured performances based on the data collected in 2006.

  20. Mirror alignment control for COMPASS RICH-1 detector

    Energy Technology Data Exchange (ETDEWEB)

    Alexeev, M. [INFN, Sezione di Torino and University of East Piemonte, Alessandria (Italy); Birsa, R. [INFN, Sezione di Trieste, Trieste (Italy); Bradamante, F.; Bressan, A. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Chiosso, M. [INFN, Sezione di Torino and University of Torino, Torino (Italy); Ciliberti, P. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Dalla Torre, S. [INFN, Sezione di Trieste, Trieste (Italy); Denisov, O. [INFN, Sezione di Torino, Torino (Italy); Duic, V. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Ferrero, A. [INFN, Sezione di Torino and University of Torino, Torino (Italy); Finger, M.; Finger, M. [Charles University, Praga (Czech Republic); JINR, Dubna (Russian Federation); Giorgi, M. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Gobbo, B. [INFN, Sezione di Trieste, Trieste (Italy); Levorato, S. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Maggiora, A. [INFN, Sezione di Torino, Torino (Italy); Martin, A. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Menon, G. [INFN, Sezione di Trieste, Trieste (Italy); Panzieri, D. [INFN, Sezione di Torino and University of East Piemonte, Alessandria (Italy); Pesaro, G. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy)

    2011-05-21

    The focusing system of the COMPASS RICH-1 detector consists of two segmented spherical mirror surfaces, formed by 68 hexagonal and 48 pentagonal individual elements. All individual mirrors have two degrees of freedom to adjust the angular alignment in order to obtain a continuous spherical surface. Relative angular misalignments can be monitored on-line by the CLAM method, based on the optical reconstruction of line images. Complementing the CLAM measurements with photogrammetry, the absolute mirror orientation and position in space can be determined too. The method is described, as well as the algorithms used to access the relative and absolute mirror alignment.

  1. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Science.gov (United States)

    2010-06-10

    ... Proposals should be mailed or e-mailed to: Mr. Steven Porter, Assistant General Counsel for Electricity....porter@hq.doe.gov . An additional copy of any Project Proposal involving Southwestern should be mailed or... Porter, Assistant General Counsel for Electricity & Fossil Energy, Department of Energy, 1000...

  2. LHCb DAQ network upgrade tests

    CERN Document Server

    Pisani, Flavio

    2013-01-01

    My project concerned the evaluation of new technologies for the DAQ network upgrade of LHCb. The first part consisted in developing and Open Flow-based Clos network. This new technology is very interesting and powerful but, as shown by the results, it still needs further improvements. The second part consisted in testing and benchmarking 40GbE network equipment: Mellanox MT27500, Chelsio T580 and Huawei Cloud Engine 12804. An event-building simulation is currently been performed in order to check the feasibility of the DAQ network upgrade in LS2. The first results are promising.

  3. Monitoring of absolute mirror alignment at COMPASS RICH-1 detector

    Energy Technology Data Exchange (ETDEWEB)

    Alexeev, M. [INFN, Sezione di Torino and University of East Piemonte, Alessandria (Italy); INFN, Sezione di Trieste and University of Bari, Bari (Italy); Birsa, R. [INFN, Sezione di Trieste, Trieste (Italy); Bradamante, F.; Bressan, A. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Chiosso, M. [INFN, Sezione di Torino and University of Torino, Torino (Italy); Ciliberti, P. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Dalla Torre, S. [INFN, Sezione di Trieste, Trieste (Italy); Denisov, O. [INFN, Sezione di Torino, Torino (Italy); Duic, V. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Ferrero, A. [INFN, Sezione di Torino and University of Torino, Torino (Italy); Finger, M.; Finger, M. [Charles University, Prague (Czech Republic); JINR, Dubna (Russian Federation); Gayde, J.Ch. [CERN, European Organization for Nuclear Research, Geneva (Switzerland); Giorgi, M. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Gobbo, B.; Levorato, S. [INFN, Sezione di Trieste, Trieste (Italy); Maggiora, A. [INFN, Sezione di Torino, Torino (Italy); Martin, A. [INFN, Sezione di Trieste and University of Trieste, Trieste (Italy); Menon, G. [INFN, Sezione di Trieste, Trieste (Italy); Panzieri, D. [INFN, Sezione di Torino and University of East Piemonte, Alessandria (Italy); and others

    2014-12-01

    The gaseous COMPASS RICH-1 detector uses two spherical mirror surfaces, segmented into 116 individual mirrors, to focus the Cherenkov photons onto the detector plane. Any mirror misalignment directly affects the detector resolution. The on-line Continuous Line Alignment and Monitoring (CLAM) photogrammetry-based method has been implemented to measure the alignment of individual mirrors which can be characterized by the center of curvature. The mirror wall reflects a regular grid of retroreflective strips placed inside the detector vessel. Then, the position of each mirror is determined from the image of the grid reflection. The images are collected by four cameras. Any small mirror misalignment results in changes of the grid lines’ positions in the image. The accuracy limits of the CLAM method were checked by laser interferometry and are below 0.1 mrad.

  4. Progress of the Injector Linac Upgrade for the BEPC Ⅱ Project%BEPCⅡ直线注入器重大改进进展

    Institute of Scientific and Technical Information of China (English)

    裴国玺; 孙耀霖; 池云龙; 王书鸿

    2004-01-01

    BEPC Ⅱ-an upgrade project of Beijing Electron Positron Collider (BEPC) is a factory type of e + e- collider. It requires its injector linac to have a higher beam energy (1.89 GeV) for on-energy injection and a higher beam current (40 mA e+300 mA e- beam) and the low beam energy spread ( ± 0.5% ) are also required to meet the storage ring acceptance. Thus the original BEPC injector linac must be upgraded to have a new electron gun with its complete tuning system, a new positron source with a flux concentrator, a new RF power system with its phasing loops and a new beam tuning system with orbit correction and optics tuning devices. These new components have been designed, fabricated, tested and will be installed in their final positions in this spring and summer, which are described in this paper.%BEPCⅡ是"工厂"型的高亮度正负电子对撞机.它要求其直线注入器提供高能(1.89 GeV)和强流(40 mA e+,300 mA e-)的正负电子束以实现全能量注入和高注入速率(50 mA/min.e+),并要求直线注入器出口正负电子束的发射度低(1.6πmm·mrad e+,0.2πmm·mrad e-)、能散小(±0.5%)以满足储存环接受度的要求.因此,必须对现有BEPC的直线注入器作重大改进,包括新电子枪及其束流调整系统、新正电子源及其磁号装置、新微波功率源及其相位控制系统、新的束流轨道和光路调整系统等.这些新系统和装置大多已完成了设计、研制、测试和试组装等,将在今年的春夏安装于隧道,并期望在年底前获得正负电子束.

  5. Upgrading of Intermediate Bio-Oil Produced by Catalytic Pyrolysis

    Energy Technology Data Exchange (ETDEWEB)

    Abdullah, Zia [Battelle Memorial Inst., Columbus, OH (United States); Chadwell, Brad [Battelle Memorial Inst., Columbus, OH (United States); Taha, Rachid [Battelle Memorial Inst., Columbus, OH (United States); Hindin, Barry [Battelle Memorial Inst., Columbus, OH (United States); Ralston, Kevin [Battelle Memorial Inst., Columbus, OH (United States)

    2015-06-30

    The objectives of this project were to (1) develop a process to upgrade catalytic pyrolysis bio-oil, (2) investigate new upgrading catalysts suited for upgrading catalytic pyrolysis bio-oil, (3) demonstrate upgrading system operation for more than 1,000 hours using a single catalyst charge, and (4) produce a final upgraded product that can be blended to 30 percent by weight with petroleum fuels or that is compatible with existing petroleum refining operations. This project has, to the best of our knowledge, for the first time enabled a commercially viable bio-oil hydrotreatment process to produce renewable blend stock for transportation fuels.

  6. 油品质量升级项目财务效益分析方法探讨%Probing into Financial Benefit Analysis Method for Oil Products Quality Upgrading Projects

    Institute of Scientific and Technical Information of China (English)

    王锋先; 许红

    2016-01-01

    针对汽油质量升级的主要措施项目,分析不同措施对炼厂的产品结构、质量的影响,从评价的范围、原料产品的定价、投资分摊、评价指标等方面进行了探讨,有助于合理地论证质量升级项目的真实效益。%Aiming at major measure projects of gasoline quality upgrading, the article analyzes the influence of different measures upon refinery product structure and quality, probing into the range of evaluation, the pricing of raw materials and products, investment allocation and evaluating indexes, contributing to rational demonstration of the actual benefits for quality upgrading projects.

  7. Investigation of the Chromosphere-Corona Interface with the Upgraded Very high angular Resolution ULtraviolet Telescope (VAULT2.0) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose a three-year effort to upgrade our existing sub-arcsecond Lyman-alpha telescope payload to improve the observing cadence by a factor of 2, increase the...

  8. ATLAS Detector Upgrade Prospects

    Science.gov (United States)

    Dobre, M.; ATLAS Collaboration

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC was ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015 and 2016. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, which will deliver of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb ‑1 expected for LHC running by the end of 2018 to 3000 fb ‑1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extensions to larger pseudorapidity, particularly in tracking and muon systems. This report summarizes various improvements to the ATLAS detector required to cope with the anticipated evolution of the LHC luminosity during this decade and the next. A brief overview is also given on physics prospects with a pp centre-of-mass energy of 14 TeV.

  9. ATLAS Detector Upgrade Prospects

    CERN Document Server

    Dobre, Monica; The ATLAS collaboration

    2016-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC is ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred f b −1 expected for LHC running to 3000 f b −1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of ext...

  10. ATLAS Detector Upgrade Prospects

    CERN Document Server

    Dobre, Monica; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is ramped up and successfully took data at the center-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extens...

  11. The COMPASS RICH-1 read-out system

    CERN Document Server

    Baum, G; Bradamante, Franco; Bressan, A; Chapiro, A; Cicuttin, A; Ciliberti, P; Colavita, A A; Costa, S; Crespo, M; Cristaudo, P; Dalla Torre, S; Díaz, V; Fauland, P; Fratnik, F

    2003-01-01

    This paper describes the reconfigurable read-out system for the 82944 RICH-1 channels of the COMPASS experiment (NA58) at CERN. The system is based on 192 identical large front-end boards (BORA board). BORA was designed for acquiring, digitizing, threshold subtracting and transmitting event data. The overall operation of the board is controlled and supervised by a DSP tightly interacting with an FPGA that acts as a parallel co-processor. The DSP allows characterizing each analog channel by locally calculating noise and pedestal. Each BORA communicates with the outside world through two optical fibers and through a dedicated DSP network. One optical fiber is used to receive event triggers, and the other one is used to transmit event data to subsequent processing stages of the acquisition system. The DSP network allows reconfiguring and reprogramming the DSPs and FPGAs as well as acquiring sample events to visualize the overall operation of the system. The whole RICH has eight DSP networks working in parallel. ...

  12. A textual analysis of the upgrading and reconstruction project of a waste incineration power plant%垃圾焚烧发电项目提标改造措施分析

    Institute of Scientific and Technical Information of China (English)

    张艳艳; 张蕊

    2013-01-01

    以某垃圾焚烧发电厂提标改造项目为例,对垃圾焚烧项目焚烧炉烟气污染物以及废水渗滤液提出较先进的治理方案,为总量减排提供一定的技术支持。%With the upgrading and reconstruction project of a waste incineration power plant as an example , Proposing advanced pollu-tion control scheme for the pollutant -leachate and furnace -gas of waste incineration project , which was provide technical support for the to-tal emission reduction .

  13. SuperHILAC Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Feinberg, B.; Brown, I.G.

    1986-06-01

    A high current MEtal Vapor Vacuum Arc (MEVVA) ion source is to be installed in the third injector (Abel) at the SuperHILAC, representing the first accelerator use of this novel ion source. The MEVVA source has produced over 1 A of uranium in all charge states, with typically more than 100 electrical mA (emA) of U/sup 5 +/. A substantial fraction of this high current, heavy ion beam must be successfully transported to the entrance of the Wideroe linac to approach the 10 emA space-charge output limit of the Wideroe. Calculations show that up to 50 emA of U/sup 5 +/ can be transported through the present high voltage column. A bouncer will be added to the Cockcroft-Walton supply to handle the increased beam current. The Low Energy Beam Transport line vacuum will be improved to reduce charge exchange, and the phase matching between the 23 MHz Wideroe and the 70 MHz Alvarez linacs will be improved by the addition of two 70 HMz bunchers. The installation of the MEVVA source along with the modifications described above are expected to result in a five-fold increase in beam delivered to Bevatron experiments, increasing the extracted uranium beam to 5 x 10/sup 7/ ions/pulse.

  14. Read-out electronics for fast photon detection with COMPASS RICH-1

    CERN Document Server

    Abbon, P

    2008-01-01

    A new read-out electronics system has been developed for the fast photon detection of the central region of the COMPASS RICH-1. The project is based on multi-anode photomultipliers read out by the high-sensitivity MAD4 preamplifier-discriminator and the dead-time free F1 TDC chip characterised by high time resolution. The system has been designed taking into account the high photon flux in the central region of the detector and the high rate requirement of the COMPASS experiment. The system is described in detail together with the measured performances. The new electronics system has been installed and used for the 2006 data taking; it entirely fulfils the expected performances.

  15. BEPCII Injector Linac Upgrade and Beam Instabilities

    Institute of Scientific and Technical Information of China (English)

    WANG Shu-Hong; GENG Zhe-Qiao; PEI Shi-Lun; DENG Bing-Lin; CHEN Zhi-Bi; PEI Guo-Xi; CHI Yun-Long; CHEN Yan-Wei; CAO Jian-She; KONG Xiang-Cheng; ZHAO Feng-Li; HOU Mi; LIU Wei-Bin

    2008-01-01

    The upgrade project of the Beijing Electron Positron Collider (BEPCII) and its injector linac is working well.The linac upgrade aims at a higher injection rate of 50 mA/min into the storage ring,which requires an injected beam with low emittance,low energy spread and high beam orbit and energy stabilities. This goal is finally reached recently by upgrading the linac components and by dealing with rich and practical beam physics,which are described in this study.

  16. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  17. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  18. Upgrading uncompetitive products economically

    DEFF Research Database (Denmark)

    Lu, Hua; Jensen, Christian Søndergaard

    2012-01-01

    the k products in T that can be upgraded to not be dominated by any products in P at the lowest cost. This problem is non-trivial due to not only the large data set sizes, but also to the many possibilities for upgrading a product. We identify and provide solutions for the different options...... by the join approach to prune upgrade candidates with uncompetitive upgrade costs. Empirical studies with synthetic and real data show that the join approach is efficient and scalable....

  19. MAST Upgrade – Construction Status

    Energy Technology Data Exchange (ETDEWEB)

    Milnes, Joe, E-mail: Joe.Milnes@ccfe.ac.uk; Ayed, Nizar Ben; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O’Gorman, Tom; Scannell, Rory

    2015-10-15

    Highlights: • Outlines unique capability of MAST-U, including divertor and diagnostic capability. • Describes progress made in the manufacture and assembly of key MAST-U components. • Highlights the design challenges that have been overcome. • Lists the key lessons learned thus far in the project. - Abstract: The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: (1) testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); (2) adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and (3) exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progress in delivering the upgraded diagnostic capability, the modification and upgrading of the NBI heating systems and the complete overhaul of the machine control infrastructure, including a new control room with full remote participation facilities.

  20. ATLAS-IBL Pixel Upgrade

    CERN Document Server

    LaRosa, A; The ATLAS collaboration

    2010-01-01

    The upgrade for the ATLAS detector will undergo different phase towards Super-LHC. The first upgrade for the Pixel Detector will consist in the construction of a new pixel layer which will be installed during the first shutdown of the LHC machine (SLHC Phase I). The new detector, called Insertable B-Layer (IBL), will be inserted between the existing pixel detector and a new (smaller radius) beam-pipe at a radius of 3.2 cm. The IBL will require the development of several new technologies to cope with increase of radiation or pixel occupancy and also to improve the physics performance which will be achieved by reduction of the pixel size and of the material budget. Three different promising sensor technologies (Planar-Si, 3D-Si and Diamond) are currently under investigation for the pixel detector. An overview of the project with particular emphasis on pixel module studies, irradiation and beam test plans will be presented.

  1. Upgrading across Organisational and Geographical Configurations : Analysis of the Chinese Automotive Industry

    NARCIS (Netherlands)

    E. van Tuijl (Erwin)

    2015-01-01

    markdownabstract__Abstract__ This thesis deals with upgrading: a process of learning and knowledge sourcing in order to generate value added. We analyse how upgrading takes place across various organisational configurations: formal collaboration, clusters, projects, and events. Moreover, we investi

  2. Upgrading across Organisational and Geographical Configurations : Analysis of the Chinese Automotive Industry

    NARCIS (Netherlands)

    E. van Tuijl (Erwin)

    2015-01-01

    markdownabstract__Abstract__ This thesis deals with upgrading: a process of learning and knowledge sourcing in order to generate value added. We analyse how upgrading takes place across various organisational configurations: formal collaboration, clusters, projects, and events. Moreover, we

  3. High temperature ceramic membrane reactors for coal liquid upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-06-19

    In this project we well evaluate the performance of Sel-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated. (VC)

  4. MAST Upgrade - Construction Status

    CERN Document Server

    Milnes, Joe; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O'Gorman, Tom; Scannell, Rory

    2015-01-01

    The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: 1) Testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); 2) Adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and 3) Exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progr...

  5. ATLAS Future Upgrade

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00225024; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is ramped up and successfully took data at the center-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Along with maintenance and consolidation of the detector in the past few years, ATLAS has added inner b-layer to its tracking system. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requir...

  6. The ALICE pixel detector upgrade

    Science.gov (United States)

    Reidt, F.

    2016-12-01

    The ALICE experiment at the CERN LHC is designed to study the physics of strongly interacting matter, and in particular the properties of the Quark-Gluon Plasma, using proton-proton, proton-nucleus and nucleus-nucleus collisions. The ALICE collaboration is preparing a major upgrade of the experimental apparatus to be installed during the second long LHC shutdown in the years 2019-2020. A key element of the ALICE upgrade is the new, ultra-light, high-resolution Inner Tracking System. With respect to the current detector, the new Inner Tracking System will significantly enhance the pointing resolution, the tracking efficiency at low transverse momenta, and the read-out rate capabilities. This will be obtained by seven concentric detector layers based on a Monolithic Active Pixel Sensor with a pixel pitch of about 30×30 μm2. A key feature of the new Inner Tracking System, which is optimised for high tracking accuracy at low transverse momenta, is the very low mass of the three innermost layers, which feature a material budget of 0.3% X0 per layer. This contribution presents the design goals and layout of the upgraded ALICE Inner Tracking System, summarises the R&D activities focussing on the technical implementation of the main detector components, and the projected detector performance.

  7. Scenarios for the LHC Upgrade

    CERN Document Server

    Scandale, Walter

    2008-01-01

    The projected lifetime of the LHC low-beta quadrupoles, the evolution of the statistical error halving time, and the physics potential all call for an LHC luminosity upgrade by the middle of the coming decade. In the framework of the CARE-HHH network three principal scenarios have been developed for increasing the LHC peak luminosity by more than a factor of 10, to values above 1035 cm−2s−1. All scenarios imply a rebuilding of the high-luminosity interaction regions (IRs) in combination with a consistent change of beam parameters. However, their respective features, bunch structures, IR layouts, merits and challenges, and luminosity variation with β∗ differ substantially. In all scenarios luminosity leveling during a store would be advantageous for the physics experiments. An injector upgrade must complement the upgrade measures in the LHC proper in order to provide the beam intensity and brightness needed as well as to reduce the LHC turnaround time for higher integrated luminosity.

  8. The LHCb Muon Upgrade

    CERN Multimedia

    Cardini, A

    2013-01-01

    The LHCb collaboration is currently working on the upgrade of the experiment to allow, after 2018, an efficient data collection while running at an instantaneous luminosity of 2x10$^{33}$/cm$^{-2}$s$^{-1}$. The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. The muon system will be upgraded in two phases. In the first phase, the off-detector readout electronics will be redesigned to allow complete event readout at 40 MHz. Also, part of the channel logical-ORs, used to reduce the total readout channel count, will be removed to reduce dead-time in critical regions. In a second phase, higher-granularity detectors will replace the ones installed in highly irradiated regions, to guarantee efficient muon system performances in the upgrade data taking conditions.

  9. LEP is upgraded

    CERN Multimedia

    1995-01-01

    A superconducting radio-frequency cavity is installed on the Large Electron-Positron (LEP) collider. This upgrade, known as LEP-2, allowed the accelerator to reach new, higher energies and so investigate new areas of physics.

  10. Trajectory for Industrial Upgrade

    Institute of Scientific and Technical Information of China (English)

    LIU YUNYUN

    2010-01-01

    @@ The Ministry of Industry and Information Technology (MIIT) ordered the closure of outdated production lines in 18 industries as part of the country's plan to upgrade its industrial structure and move up the value chain.

  11. Quality control of a 2 m{sup 2} Micromegas detector for the ATLAS muon spectrometer upgrade project using contact CCDs

    Energy Technology Data Exchange (ETDEWEB)

    Biebel, Otmar; Hertenberger, Ralf; Wagner-Kuhr, Jeannine [LMU, Munich (Germany); Wellenstein, Hermann [Brandeis University, Waltham (United States)

    2016-07-01

    The inner endcap region of the ATLAS muon spectrometer, the Small Wheel, will be upgraded in 2019 using Micromegas detectors to retain the tracking performance after the LHC luminosity upgrade. In the new Small Wheel Micromegas detectors will be arranged in trapezoidal quadruplets of four active layers each and 2-3 m{sup 2} in size. Guaranteeing the design spatial resolution of 100 μm poses a huge challenge for the mechanical precision of each readout plane and the alignment between the 4 planes. We report about a novel optical alignment tool based on Contact CCDs and coded masks which will be used for the quality control during the construction of the Micromegas detectors. Using pictures of an arbitrary cutout of a coded mask on a readout board taken by a Contact CCD the relative position of the mask with respect to the center of the Contact-CCD can be determined on sub μm accuracy. Together with a calibrated reference device the position of masks within a single plane but also within a quadruplet can be measured with high precision allowing to monitor the relative position of the 3 PowerCircuitBoards within a single plane and the relative alignment between the different planes in a quadruplet. In this presentation the ideas of this new optical alignment tool are shown as well as first quality control studies using a Contact-CCD.

  12. Optics upgrade for switchyard

    Energy Technology Data Exchange (ETDEWEB)

    Kobilarcik, Thomas R.; /Fermilab

    2005-08-01

    An upgrade of the Switchyard optics is proposed. This upgrade extends the P3 (old Main Ring) lattice through enclosure C. The septa for the 3-way Meson Area split is moved from enclosure F1 to enclosure M01. The functionality of the Meson Target Train is preserved. Finally, for the purpose of demonstrating that the resulting split can be transported, a straw-man lattice is proposed for enclosure M02 and beyond.

  13. LHC Upgrade Scenarios

    CERN Document Server

    Zimmermann, F

    2007-01-01

    The EU CARE-HHH and US-LARP studies for an LHC luminosity upgrade aim at increasing the peak luminosity by a factor of 10, to 1035 cm-2s-1. The luminosity can be raised by rebuilding the interaction regions (IRs) in combination with a consistent change of beam parameters. In addition to advanced low-beta quadrupoles, the upgraded IRs may accommodate other new elements such as slim s.c. dipoles or quadrupoles embedded deep inside the detectors, global low-angle crab cavities, and wire compensators of long-range beam-beam effects. Important constraints on the upgrade path are the maximum acceptable number of detector pile-up events, favoring many closely spaced bunches, and the heat load on the cold-magnet beam screens, pointing towards fewer and more intense bunches. In order to translate the increased peak luminosity into a correspondingly higher integrated luminosity, the upgrade of the LHC ring should be complemented by an upgrade of the injector complex. I will present preferred upgrade scenarios for the L...

  14. VISIR upgrade overview and status

    Science.gov (United States)

    Kerber, Florian; Käufl, Hans-Ulrich; Baksai, Pedro; Di Lieto, Nicola; Dobrzycka, Danuta; Duhoux, Philippe; Finger, Gert; Heikamp, Stephanie; Ives, Derek; Jakob, Gerd; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Sandrock, Stefan; Siebenmorgen, Ralf; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Valdes, Guillermo; Venema, Lars; Weilenmann, Ueli

    2014-07-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As AQUARIUS detector array (Raytheon) which has been carefully characterized in ESO's IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a user-defined constraint on water vapour. During the commissioning in 2012 it was found that the on-sky sensitivity of the AQUARIUS detector was significantly below expectations and that VISIR was not ready to go back to science operations. Extensive testing of the detector arrays in the laboratory and on-sky enabled us to diagnose the cause for the shortcoming of the detector as excess low frequency noise (ELFN). It is inherent to the design chosen for this detector and can't be remedied by changing the detector set-up. Since this is a form of correlated noise its impact can be limited by modulating the scene recorded by the detector. We have studied several mitigation options and found that faster chopping using the secondary mirror (M2) of the VLT offers the most promising way forward. Faster M2 chopping has been tested and is scheduled for implementation before the end of 2014

  15. The upstream tracker for the LHCb upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Steinkamp, Olaf, E-mail: olafs@physik.uzh.ch

    2016-09-21

    The LHCb collaboration is planning a comprehensive upgrade of the experiment for the long shutdown of the LHC in 2019/20. As part of this upgrade, the tracking station in front of the LHCb dipole magnet will be replaced by a new planar four-layer silicon micro-strip detector with 40 MHz readout and silicon sensors with finer granularity and improved radiation hardness. Key design aspects of this new Upstream Tracker are described and a brief overview of the status of the project is given.

  16. Seamounts, Direct Blast and Volume Reverberation Upgrades

    Science.gov (United States)

    1988-11-30

    Highway. Suits 1204. Arlington, VA 22202-4302. "n to the Office of Management and Budget. Peperworik Reduction Project (0704-0188). Washington. DC 2050M. 1...Subtitle. 5. Funding Numbers. Seamounts, Direct Blast And Volume Reverberation Upgrades proram Eemen No 3 7 85N Project No R02017 6. Author(s). L...Section Pae 1 INTRODUCTION ................................. 1-1 2 ASERT: DATA PREPARATION FOR ASTRAL ........... 2-1 2.1 Overview and Purpose of

  17. Thes - Website for Thermal Shields Upgrade Management

    CERN Document Server

    Micula, Adina

    2013-01-01

    There are a total of 1695 thermal shields (TS) in the interconnections between the superconducting magnets. During LHC Long Shutdown 1 (LS1) all of these TS are being upgraded with a new fixation design. This procedure involves the transport of all the TS from LHC to a workshop on the surface where they are being modified and the subsequent transport of the upgraded TS back to the tunnel where they are laid on the cryostats and await the closure of the interconnection. These operations have to be carefully coordinated in order to ensure that there are always enough modified TS to satisfy the demand in the tunnel and respect the time constraint imposed by the schedule of LS1. As part of my summer project, I developed a database driven website whose aim is to enable the TS upgrade monitoring.

  18. The LHCb Detector Upgrade

    CERN Document Server

    Schindler, H

    2013-01-01

    The LHCb collaboration presented a Letter of Intent (LOI) to the LHCC in March 2011 for a major upgrading of the detector during Long Shutdown 2 (2018) and intends to collect a data sample of 50/fb in the LHC and High-Luminosity-LHC eras. The aim is to operate the experiment at an instantaneous luminosity 2.5 times above the present operational luminosity, which has already been pushed to twice the design value. Reading out the detector at 40MHz allows to increase the trigger efficiencies especially for the hadronic decay modes. The physics case and the strategy for the upgrade have been endorsed by the LHCC. This paper presents briefly the physics motivations for the LHCb upgrade and the proposed changes to the detector and trigger.

  19. The LHCb VELO upgrade

    CERN Document Server

    Collins, P; Poikela, T; Crossley, M; Kucharczyk, M; Whitehead, M; Dumps, R; Mountain, R; Artuso, M; Rodrigues, E; Tlustos, L; Papadelis, A; Buytaert, J; Blusk, S; Parkes, C; Xing, Z; Eklund, L; Coco, V; Michel, T; Campbell, M; Bowcock, T J V; Wang, J C; Akiba, K; Gligorov, V; Huse, T; Llin, L F; Gandelman, M; Plackett, R; Esperante, D; Maneuski, D; Bayer, F; Llopart, X; Alexander, M; Gallas, A; Nichols, M; van Beuzekom, M G; John, M

    2011-01-01

    The LHCb experiment at the LHC plans to massively increase its data taking capabilities by running at a higher luminosity with a fully upgraded detector around 2016. This scheme is independent of (but compatible with) the plans for the SLHC upgrades. The silicon detector will be upgraded to provide a 40 MHz readout and to be able to cope with the increased radiation environment. This paper describes the options currently under consideration. A highlight of the R\\&D so far undertaken is a beam test during summer 2009 using the Timepix chip to track charged particles. Preliminary results are presented, including a measurement of the resolution achieved by the 55 mu m pitch pixel array of better than 9.5 mu m for perpendicular tracks and 55 mu m for angled tracks. (C) 2010 Elsevier B.V. All rights reserved.

  20. 农村公路提档升级工程实践研究%Practice on the Upgrading of Rural Roads Project

    Institute of Scientific and Technical Information of China (English)

    孟磊

    2016-01-01

    Due to low return on investment in county roads and rural roads, construction funds are very scarce, and investment and financing is particularly difficult, and construction materials and equipment of county, township, and rural roads have no room for cost reduction. Therefore, it is necessary to carry out the upgrading of rural roads on the existing basis, and reducing construction costs, reducing maintenance, simplifying the process, improving quality and extending the life of the road are the issues at stake. Technical characteristics and inherent characteristics of the soil firming agent can meet the requirements above, and the successful tests of township road in several provinces make it widely used. This paper, based on experience of the soil firming agent used in the upgrading of rural roads, provides references for the other road, in order to make a contribution to engineering cost savings and reducing waste.%县乡道路和农村公路的投资回报率低,建设资金十分匮乏,投、融资又特别困难,且目前县乡道路和农村公路施工所用的材料和设备,已经没有降低造价的空间.因此,农村公路在现有基础上进行必要的提档升级,降低工程造价、减少维护、简化工艺、提高质量、延长道路使用寿命是目前县乡道路和农村道路迫在眉睫的问题.土壤固化剂的技术特点和其固有的特性能满足上述的要求,并成功在我国部分省份的县乡道路中修建试验并取得成功,进而大规模使用.本文根据土壤固化剂在农村公路提档升级中的成功应用经验以期为其他公路提档升级工作作为参考,为工程节约成本、减少浪费做更大贡献.

  1. HIRFL Operation and Upgrade

    Institute of Scientific and Technical Information of China (English)

    ZhaoHongwei; WangYifang; ZhanWenlong; WeiBaowen; HIRFLTeam

    2003-01-01

    After almost one year shutdown for upgrading the vacuum chamber of the iniector SFC,SFC has been in operation separately since May 2003. The SFC operation statistics and accelerated heams from May to December 2003 are shown in Table 1 and 2. The main cyclotron SSC has beenfor still shut down in 2003 for upgrading the SSC power supply system, control and diagnostic system, and themain experimental area, LECR3, an ECR ion source dedicated for atomic physics and surface physics research, has provided 2488 hours beams for experiments of atomic physics research.

  2. ATLAS/CMS Upgrades

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00370685; The ATLAS collaboration

    2016-01-01

    Precision studies of the Standard Model (SM) and the searches of the physics beyond the SM are ongoing at the ATLAS and CMS experiments at the Large Hadron Collider (LHC). A luminosity upgrade of LHC is planned, which provides a significant challenge for the experiments. In this report, the plans of the ATLAS and CMS upgrades are introduced. Physics prospects for selected topics, including Higgs coupling measurements, Bs,d -> mumu decays, and top quark decays through flavor changing neutral current, are also shown.

  3. Design and Construction of Precision Tooling for the Construction of Resistive Strip Micromegas Detectors for the ATLAS Small Wheel Upgrade Project

    CERN Document Server

    Mueller, Ralph Soeren Peter; The ATLAS collaboration

    2015-01-01

    Mechanical precision is a key-aspect of the $2~m^2$ high-rate capable Micromegas detectors for the upgrade of the Small Wheels of the ATLAS muon spectrometer. 32 SM2 quadruplets will be built by four German sites with cathodes and strip-anodes made of stable honeycomb sandwiches.\\\\ To achieve the required single plane resolution below $100\\mu m$ the deviation from planarity of a single detector plane must not exceed $80\\mu m$ in direction perpendicular to the precision coordinate. The global position of the readout strips has to be within $30\\mu m$ for a single readout-plane of three PCBs, as well as between all four planes of a quadruplet.\\\\ Precision tooling is used for the correct positioning of readout PCBs and readout sandwich planes. For quality control of the planarity of the sandwich planes a laser distance sensor combined with a coordinate measurement system has been developed. Deviation from planarity below 10 $\\mu$m can be easily resolved.\\\\ We will present key features of the challenging construct...

  4. Upgrading of Boundary Dam spillway

    Energy Technology Data Exchange (ETDEWEB)

    McPhail, Gordon; MacMillan, Dave; Smith, Bert [KGS Group, Winnipeg, (Canada); Lacelle, Justin [SaskPower, Regina, (Canada)

    2010-07-01

    An initial dam safety review was performed in 2005 and identified a number of concerns; the most critical were insufficient spillway capacity and deficiencies in the condition of the existing spillways. This paper described the challenges faced by the upgrading operation on the 50 year old Boundary Dam spillway started in 2008. SaskPower retained the KGS Group to increase the design spillway capacity to 1200 m3/s and remedy observed defects. The construction project involved maintaining the reservoir at full supply level while the 20m long spillway chute and stilling basin below were completely replaced. The difficulties came from the need to complete each year's construction such that the spillway could potentially pass spring flood flows. This paper showed that the upgrade measures selected for implementation were developed through close dialogue between the owner and the designer, with valuable input provided by a panel of external experts as well as from contractors participating in the design process.

  5. Lightweight incremental application upgrade

    NARCIS (Netherlands)

    T. van der Storm (Tijs)

    2006-01-01

    textabstractI present a lightweight approach to incremental application upgrade in the context of component-based software development. The approach can be used to efficiently implement an automated update feature in a platform and programming language agnostic way. A formal release model is present

  6. LHCb VELO upgrade

    Science.gov (United States)

    Hennessy, Karol

    2017-02-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of 2×1033 cm-2 s-1. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have 55×55 μm2 pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The foil will be manufactured through milling and possibly thinned further by chemical etching. The material budget will be minimised by the use of evaporative CO2 coolant circulating in microchannels within 400 μm thick silicon substrates. The current status of the VELO upgrade is described and latest results from operation of irradiated sensor assemblies are presented.

  7. Upgrade of telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, work will be carried out on the CERN switching centre between Monday 23 October 8.00 p.m. and Tuesday 24 October 2.00 a.m. Telephone services may be disrupted and possibly even interrupted during this operation. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  8. 关于提高本科毕业设计(论文)水平的探讨%How to Upgrade the Quality of Graduation Project Design (Thesis) for the Undergraduate

    Institute of Scientific and Technical Information of China (English)

    董云会; 孙文宵

    2011-01-01

    In this paper,writing document review and holding periodically academic seminar during implementing the graduation project(Thesis) are proposed for the purpose of improving the scientific research ability and writing skill of the undergraduates.It is suggested that the tutors should encourage the student to complete the task independently.In order to upgrade the graduation pro-ject quality,the paper schematically presents the various aspects concerned in the completion of the task,such as choosing a re-search topic,reviewing the literature documents,determining a research scheme and a research plan as well as paper-writing and organizing.It is also summarized that how to improve students' independent analysis and problem-solving ability via the graduation project training.All these measures are of significance to upgrade the teaching quality for the graduation project.%本文提出在毕业设计(论文)的完成过程中采用写文献综述和定期举行讨论会的方法,提高学生科研和写作能力的经验和看法。建议指导教师在毕业设计(论文)中鼓励学生独立完成题目,文章从如何选题、文献综述、研究方案制定、研究计划制定和论文撰写注意事项等方面,详细介绍了本科设计(论文)写作的各个环节。总结了如何通过毕业设计(论文)环节提高学生独立分析问题和解决问题的能力,这对提高本科毕业设计(论文)环节的教学质量具有现实意义。

  9. Biogas upgrading to biomethane. Proceedings; Biogasaufbereitung zu Biomethan. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-05

    Within the 6th Hanauer Dialogue 'Biogas upgrading to biomethane' at 21st February, 2008, the following lectures were held: (a) Processing of biogas - an introduction (Michael Beil); (b) The climate protecting targets of the Federal Republic of Germany: Which role will play the upgrading of biogas, and which legal boundary conditions are created by the Federal Government? (Uwe Holzhammer); (c) Future strategy: CH{sub 4} grids (Juergen Schmid); (d) Biogas upgrading and biomethane utilization in Sweden (Anneli Petersson); (e) Biogas upgrading and utilization of bio methane in Switzerland (Arthur Wellinger); (f) Biogas upgrading by means of pressure swing adsorption (Alfons Schulte-Schulze Berndt); (g) Biogas upgrading by means of pressurized water washing (Ulf Richter); (h) Biogas upgrading for feeding in public grids. The case of biogas plant Bruck a.d. Leitha (Michael Harasek); (i) Biogas upgrading by means of chemical absorption according to the LP Cooab process (Jerome van Beek); (j) Practical experiences in unpressurized amine washing MT bio methane (Karsten Wuensche); (k) Biogas upgrading by means of organic physical washing with HAASE biogas amplifiers (Roland Kahn); (l) Upgrading using cryogenic technology; the GPP registered -system (Jeroen de Pater); (m) Micro Gas Distribution Systems: Alternatives to biogas upgrading and grid injection (Michael Beil, Bernd Krautkremer); (n) Feeding of exchange gas. The case of project Straelen and Kerpen (Frank Schaefer); (o) Feeding of biogas from the view of grid operators (Norbert Nordmeyer); BIOGASMAX: Biogas as Vehicle Fuel - Market Expansion to 2020 Air Quality (Michael Beil, Uwe Hoffstede); (p) Study: Feeding of biogas into the natural gas distribution system (Fachagentur Nachwachsende Rohstoffe).

  10. Energy Efficiency Through Lighting Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Berst, Kara [Chickasaw Nation, Ada, OK (United States); Howeth, Maria [Chickasaw Nation, Ada, OK (United States)

    2013-02-26

    Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year's average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

  11. The Magnetic Distortion Calibration System of the LHCb RICH1 Detector

    CERN Document Server

    Borgia, A; Contu, A; D'Ambrosio, C; Frei, C; Harnew, N; John, M; Lefeuvre, G; Mountain, R; Stone, S; Websdale, D; Xing, F

    2014-01-01

    The LHCb RICH1 detector uses hybrid photon detectors (HPDs) as its optical sensors. A calibration system has been constructed to provide corrections for distortions that are primarily due to external magnetic fields. We describe here the system design, construction, operation and performance.

  12. Aligning component upgrades

    Directory of Open Access Journals (Sweden)

    Roberto Di Cosmo

    2011-08-01

    Full Text Available Modern software systems, like GNU/Linux distributions or Eclipse-based development environment, are often deployed by selecting components out of large component repositories. Maintaining such software systems by performing component upgrades is a complex task, and the users need to have an expressive preferences language at their disposal to specify the kind of upgrades they are interested in. Recent research has shown that it is possible to develop solvers that handle preferences expressed as a combination of a few basic criteria used in the MISC competition, ranging from the number of new components to the freshness of the final configuration. In this work we introduce a set of new criteria that allow the users to specify their preferences for solutions with components aligned to the same upstream sources, provide an efficient encoding and report on the experimental results that prove that optimising these alignment criteria is a tractable problem in practice.

  13. Aligning component upgrades

    CERN Document Server

    Di Cosmo, Roberto; Michel, Claude; 10.4204/EPTCS.65.1

    2011-01-01

    Modern software systems, like GNU/Linux distributions or Eclipse-based development environment, are often deployed by selecting components out of large component repositories. Maintaining such software systems by performing component upgrades is a complex task, and the users need to have an expressive preferences language at their disposal to specify the kind of upgrades they are interested in. Recent research has shown that it is possible to develop solvers that handle preferences expressed as a combination of a few basic criteria used in the MISC competition, ranging from the number of new components to the freshness of the final configuration. In this work we introduce a set of new criteria that allow the users to specify their preferences for solutions with components aligned to the same upstream sources, provide an efficient encoding and report on the experimental results that prove that optimising these alignment criteria is a tractable problem in practice.

  14. Computer codes used during upgrading activities at MINT TRIGA reactor

    Energy Technology Data Exchange (ETDEWEB)

    Mohammad Suhaimi Kassim; Adnan Bokhari; Mohd. Idris Taib [Malaysian Institute for Nuclear Technology Research, Kajang (Malaysia)

    1999-10-01

    MINT TRIGA Reactor is a 1-MW swimming pool nuclear research reactor commissioned in 1982. In 1993, a project was initiated to upgrade the thermal power to 2 MW. The IAEA assistance was sought to assist the various activities relevant to an upgrading exercise. For neutronics calculations, the IAEA has provided expert assistance to introduce the WIMS code, TRIGAP, and EXTERMINATOR2. For thermal-hydraulics calculations, PARET and RELAP5 were introduced. Shielding codes include ANISN and MERCURE. However, in the middle of 1997, MINT has decided to change the scope of the project to safety upgrading of the MINT Reactor. This paper describes some of the activities carried out during the upgrading process. (author)

  15. Small-scale upgrading and refinement of biogas; Smaaskalig uppgradering och foeraedling av biogas

    Energy Technology Data Exchange (ETDEWEB)

    Blom, Helena; Mccann, Michael; Westman, Johan (Poeyry SwedPower AB, Stockholm (Sweden))

    2012-02-15

    Small-scale upgrading and refinement of biogas is a report which aims to compile the state of knowledge in small-scale biogas upgrading. The project have been a collaboration with Agrovaest and Energy Farm and was funded by the Foundation for Agricultural Research, Western Goetaland and the Agriculture Department. The technology available for small scale upgrade has been examined from the technical and economic standpoint. An economic comparison has been made and the production of upgraded biogas has been estimated for different raw gas flows. The work also contains information related to biogas production, upgrading and a comparison of liquid biogas, DME and Ecopar-diesel

  16. CMS upgrades for SLHC

    CERN Document Server

    Palla, Fabrizio

    2006-01-01

    I will discuss the impact of the LHC luminosity upgrade on CMS detector. While most of the CMS can possibly cope with the increased luminosity, the Tracker must undergo a major redesign in technology both in terms of detector substrates as well as in the data transfer links. I will show the impact on CMS of reduced bunch length and machine elements close to the interaction point.

  17. The VELO Upgrade

    CERN Document Server

    Jans, Eddy

    2015-01-01

    A significant upgrade of the LHCb detector is scheduled to be installed in 2018-2019. Afterwards all sub-detectors will be read out at the LHC bunch crossing frequency of 40 MHz and the trigger will be fully implemented in software. The silicon strip vertex detector will be replaced by a hybrid pixel detector. In these proceedings the following items are discussed: frontend ASIC, data rates, data transmission, cooling, radiation hard sensors, module design and simulated performance.

  18. The LHCb VELO Upgrade

    CERN Document Server

    de Capua, Stefano

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-3, will transform the experiment to a triggerless system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm, enabling the detector to run at luminosities of 2×1033 cm−2 s −1 . The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current strip detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will allow for fast pattern recognition and track reconstruction in the software trigger. The silicon pixel sensors have 55×55 µm2 pitch, and are read out by the VeloPix ASIC. The VeloPix builds on the currently available Timepix3, modified to deliver a radiation hard design capable of an order of magnitude increase in output rate. The hottest regions will have pixel hit rates of 900 Mhits/s, yielding a total data rate more than 3 Tbit/s for the upgraded VELO...

  19. LHCb VELO Upgrade

    CERN Document Server

    Hennessy, Karol

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of $2\\times10^{33} \\mathrm{cm}^{-2}\\mathrm{s}^{-1}$. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have $55\\times55 \\mu m^{2}$ pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separate...

  20. The LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Dosil Suárez, Álvaro, E-mail: alvaro.dosil@usc.es

    2016-07-11

    The upgrade of the LHCb experiment, planned for 2019, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm. The upgraded detector will run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1} and probe physics beyond the Standard Model in the heavy flavour sector with unprecedented precision. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The detector comprises silicon pixel sensors with 55×55 μm{sup 2} pitch, read out by the VeloPix ASIC, based on the TimePix/MediPix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The detector halves are retracted when the beams are injected and closed at stable beams, positioning the first sensitive pixel at 5.1 mm from the beams. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates.

  1. ATLAS Upgrades Towards the High Luminosity LHC

    CERN Document Server

    Zhu, H; The ATLAS collaboration

    2012-01-01

    After successful LHC operation at the center-of-mass energy of 7 TeV in 2011, the LHC is scheduled to deliver even more data in 2012 at 8 TeV. Meanwhile, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about 300fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon ...

  2. ATLAS Upgrades Towards the High Luminosity LHC

    CERN Document Server

    Cinca, D; The ATLAS collaboration

    2014-01-01

    After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data a...

  3. ATLAS Upgrades Towards the High Luminosity LHC

    CERN Document Server

    Elsing, M; The ATLAS collaboration

    2012-01-01

    After successful LHC operation at 7 TeV in 2011, the LHC is scheduled to deliver even more data in 2012. Meanwhile, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about 300 fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers...

  4. Hardware upgrade for A2 data acquisition

    Energy Technology Data Exchange (ETDEWEB)

    Ostrick, Michael; Gradl, Wolfgang; Otte, Peter-Bernd; Neiser, Andreas; Steffen, Oliver; Wolfes, Martin; Koerner, Tito [Institut fuer Kernphysik, Mainz (Germany); Collaboration: A2-Collaboration

    2014-07-01

    The A2 Collaboration uses an energy tagged photon beam which is produced via bremsstrahlung off the MAMI electron beam. The detector system consists of Crystal Ball and TAPS and covers almost the whole solid angle. A frozen-spin polarized target allows to perform high precision measurements of polarization observables in meson photo-production. During the last summer, a major upgrade of the data acquisition system was performed, both on the hardware and the software side. The goal of this upgrade was increased reliability of the system and an improvement in the data rate to disk. By doubling the number of readout CPUs and employing special VME crates with a split backplane, the number of bus accesses per readout cycle and crate was cut by a factor of two, giving almost a factor of two gain in the readout rate. In the course of the upgrade, we also switched most of the detector control system to using the distributed control system EPICS. For the upgraded control system, some new tools were developed to make full use of the capabilities of this decentralised slow control and monitoring system. The poster presents some of the major contributions to this project.

  5. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators.

  6. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators.

  7. Plans for the upgrade of the LHC injectors

    CERN Document Server

    Garoby, R; Goddard, B; Hanke, K; Meddahi, M; Vretenar, M

    2011-01-01

    The LHC injectors upgrade (LIU) project has been launched at the end of 2010 to prepare the CERN accelerator complex for reliably providing beam with the challenging characteristics required by the high luminosity LHC until at least 2030. Based on the work already started on Linac4, PS Booster, PS and SPS, the LIU project coordinates studies and implementation, and interfaces with the high luminosity LHC (HL-LHC) project which looks after the upgrade of the LHC itself, expected by the end of the present decade. The anticipated beam characteristics are described, as well as the status of the studies and the solutions envisaged for improving the injector performances.

  8. Environmental Assessment and Finding of No Significant Impact: Wastewater Treatment Capability Upgrade, Project NO. 96-D-122 Pantex Plant Amarillo, Texas

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-05-27

    This Environmental Assessment (EA) addresses the U.S. Department of Energy (DOE) proposed action regarding an upgrade of the Pantex Plant Wastewater Treatment Facility (WWTF). Potential environmental consequences associated with the proposed action and alternative actions are provided. DOE proposes to design, build, and operate a new WWTF, consistent with the requirements of Title 30 of the Texas Administrative Code (TAC), Chapter 317, ''Design Criteria for Sewage Systems,'' capable of supporting current and future wastewater treatment requirements of the Plant. Wastewater treatment at Pantex must provide sufficient operational flexibility to meet Pantex Plant's anticipated future needs, including potential Plant mission changes, alternative effluent uses, and wastewater discharge permit requirements. Treated wastewater effluent and non-regulated water maybe used for irrigation on DOE-owned agricultural land. Five factors support the need for DOE action: (1) The current WWTF operation has the potential for inconsistent permit compliance. (2) The existing WWTF lies completely within the 100-year floodplain. (3) The Pantex Plant mission has the potential to change, requiring infrastructure changes to the facility. (4) The life expectancy of the existing facility would be nearing its end by the time a new facility is constructed. (5) The treated wastewater effluent and non-regulated water would have a beneficial agricultural use through irrigation. Evaluation during the internal scoping led to the conclusion that the following factors are present and of concern at the proposed action site on Pantex Plant: (1) Periodic wastewater effluent permit exceedances; (2) Wetlands protection and floodplain management; (3) Capability of the existing facility to meet anticipated future needs of Pantex (4) Existing facility design life; and (5) Use of treated wastewater effluent and non-regulated water for irrigation. Evaluation during the internal scoping

  9. 核电站仪控全数字化改造项目规划和策略%Planning and Strategy of I & C Systems Upgrade Project in Nuclear Power Plant

    Institute of Scientific and Technical Information of China (English)

    蔡俊东

    2015-01-01

    Existing I&C systems for nuclear power plants designed and built in accordance with technologies in the 1 980s in China,is based either on relays or on analog components etc.Much is approaching or has exceeded its original life expectancy.The nuclear power plants have been faced with problems regarding obsolescence, burden on maintenance and testing activities, inaccuracy, and unreliability.In addition,it has been difficult to adopt new technologies to improve plant availability.So the power plant has decided to upgrade the existing I&C systems as one of the most significant parts of a larger scale modernization project.In this paper,by analyzing the necessity and complexity of the I&C systems upgrade and learning from foreign experience,we proposed some feasible methods and suggestions in terms of the project planning and technical preparation from a manufacture management point of view.The purpose is to improve the risk control in the process of project implementation,and strengthen the quality control in the design and implementation phase of the project,and ensure the safe and stable operation of the unit within the lifetime.%国内早期核电机组仪控系统主要采用80年代的主流设计,以模拟仪表和继电器控制回路为主。这些设备的设计寿命至少已超过20年,硬件的老化,人员知识结构的老化和电站对机组安全性、可靠性和操作/维护需求的提高,促使电站管理者将仪控数字化改造作为电站整体战略的一部分。通过分析核电站仪控系统改造的必要性和复杂性,借鉴国内外核电站改造项目经验,从电站生产和维修管理角度,对核电站全数字化改造的项目规划和技术准备提出可行的方法和意见。从需求角度加强电站主体对项目设计和实施过程的质量管理,强化改造项目的闭环控制,以提高改造项目在生产和维修活动中的风险控制,确保机组寿期内能安全稳定运行。

  10. 开发区工业废水处理厂提标改造工程实例%An example of upgrading and reconstruction project of industrial wastewater treatment plant in development area

    Institute of Scientific and Technical Information of China (English)

    童君

    2016-01-01

    针对开发区工业废水水质复杂, 可生化性较差的特点, 通过采取增加水解酸化段, 将传统AO工艺改造为MBBR工艺, 增建臭氧氧化-BAF深度处理工艺等措施对园区污水厂进行提标改造. 改造后运行结果显示,出水CODCr、 NH3-N、 TN质量浓度分别为38~45、 0.5~7.5、 10~14 mg/L, 稳定达到GB 18918-2002《城镇污水处理厂污染物排放标准》一级A标准的要求. 主要介绍了改造后的工艺流程, 给出了主要构筑物的设计参数及设备配置.%As industrial wastewater from development area has complicated component and is hard-biodegradable, an upgrading and reconstruction project of industrial wastewater plant in the said area was carried out through adding hydrolytic acidification unit, replacing traditional AO process with MBBR process, building out ozone oxidation-BAF advanced treatment process and some other countermeasures. The running effect of the plant after the reconstruction showed that, the mass concentrations of CODCr, NH3-N and TN in the effluent water were 38-45, 0.5-7.5 and 10-14 mg/L respectively, which met the specification for level A grade 1 in GB 18918-2002 Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant. The process flow of the recon-structed project was introduced with the design parameters and devices layout of the main structures provided also.

  11. Upgrading Enterprise Search

    Energy Technology Data Exchange (ETDEWEB)

    McDunn, R

    2005-04-28

    This presentation will describe the process we went through this past year to upgrade our enterprise search tool from a very old version of Inktomi to the latest version of Verity Ultraseek. We started with requirements gathering and then compared requirements against several available products to determine which product to choose. After purchasing the product, we worked through several defined phases of implementation and customization, with initial rollout late January 2004. Finally, we will show you where we are today and describe future search plans.

  12. Upgraded Coal Interest Group

    Energy Technology Data Exchange (ETDEWEB)

    Evan Hughes

    2009-01-08

    The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

  13. Repairing and Upgrading Your PC

    CERN Document Server

    Thompson, Robert

    2009-01-01

    Repairing and Upgrading Your PC delivers start-to-finish instructions, simple enough for even the most inexperienced PC owner, for troubleshooting, repairing, and upgrading your computer. Written by hardware experts Robert Bruce Thompson and Barbara Fritchman Thompson, this book covers it all: how to troubleshoot a troublesome PC, how to identify which components make sense for an upgrade, and how to tear it all down and put it back together. This book shows how to repair and upgrade all of your PC's essential components.

  14. Upgrading of Trichlorfon Wastewater Treatment Project%敌百虫生产废水处理工程的升级改造

    Institute of Scientific and Technical Information of China (English)

    解彦刚; 蔡凤; 张益平

    2012-01-01

    The trichlorfon wastewater from a pesticide plant is difficult to treat due to its strong a-cidity, high concentration of organic substances and low biodegradability. The combined process of iron carbon reduction and A /O technology was used in the original treatment project, which required a large amount of dilution water, and the treatment effect was unstable. The pretreatment effect was enhanced by recycling wastewater pesticide ingredients and pulse electrolysis, some treatment structures were reconstructed , and the regulation and control of the system were strengthened. These measures could generate significant emission reductions and economic benefits.%某农药厂的敌百虫生产废水酸性强,有机物浓度高,可生化性差,属难处理废水.原处理工程采用铁碳还原与A2/O相结合的工艺,但需要大量的稀释水,且处理效果不稳定.通过敌百虫转化回收系统和脉冲电解增强了预处理效果,对某些处理构筑物进行适当改造,强化了系统调控,减排效果明显,且能产生经济效益.

  15. Particle combinations in the LHCb Upgrade trigger

    CERN Document Server

    Zhao, Fanyi

    2017-01-01

    The LHCb experiment will be upgraded during long shutdown II (2018-2020) to process inelastic proton-proton collisions at 30MHz in a software application and run at a higher instantaneous luminosity of $2\\times 10^{33}cm^{−2}s^{−1}$. Each of these collisions will contain substantially more proton-proton interactions and charged particles. It is important to identify the decay vertices of heavy-flavour hadrons produced by the primary proton-proton interaction in an efficient, CPU-performant manner. In this project, I will learn about the LHCb trigger and experimental programme and investigate alternative models for reconstructing these vertices, which may scale more efficiently to the upgraded trigger conditions than the current model.

  16. LHCb VELO Upgrade

    CERN Multimedia

    van Beuzekom, Martin; Ketel, Tjeerd; Gershon, Timothy; Parkes, Christopher; Reid, Matthew

    2011-01-01

    The VErtex LOcator (VELO) is a vital piece of apparatus for allowing precision measurements in hadronic physics. It provides not only superb impact parameter resolutions but also excellent momentum resolution, both important discriminating tools for precision high energy physics. This poster focuses on the R&D going into the future LHCb VELO detector. At present there are two proposed options for the upgrade; pixel chips or strip detectors. The LHCb upgrade is designed with higher luminosities and increased yields in mind. In order to get more out of the LHCb detector changes to the front end electronics will have to be made. At present, the first level hardware trigger is sets a limiting factor on the maximum efficiency for hadronic channels. As the VELO is positioned so close the proton-proton interaction region, whatever the choice of sensor, we will require efficient cooling and some proposed solutions are outlined. The LHCb TimePix telescope has had a very successful years running, with various devic...

  17. High temperature ceramic membrane reactors for coal liquid upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-01-01

    In this project we intend to study a novel process concept, i.e.,the use of ceramic membranes reactors in upgrading of coal derived liquids. Membrane reactors have been used in a number of catalytic reaction processes in order to overcome the limitations on conversion imposed by thermodynamic equilibrium. They have, furthermore, the inherent capability for combining reaction and separation in a single step. Thus they offer promise for improving and optimizing yield, selectivity and performance of processes involving complex liquids, as those typically found in coal liquid upgrading. Ceramic membranes are a new class of materials, which have shown promise in a variety of industrial applications. Their mechanical and chemical stability coupled with a wide range of operating temperatures and pressures make them suitable for environments found in coal liquid upgrading. In this project we wig evaluate the performance of Sel-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated.

  18. High temperature ceramic membrane reactors for coal liquid upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-01-01

    In this project we intend to study a novel process concept, i.e, the use of ceramic membranes reactors in upgrading of coal derived liquids. Membrane reactors have been used in a number of catalytic reaction processes in order to overcome the limitations on conversion imposed by thermodynamic equilibrium. They have, furthermore, the inherent capability for combining reaction and separation in a single step. Thus they offer promise for improving and optimizing yield, selectivity and performance of processes involving complex liquids, as those typically found in coal liquid upgrading. Ceramic membranes are a new class of materials, which have shown promise in a variety of industrial applications. Their mechanical and chemical stability coupled with a wide range of operating temperatures and pressures make them suitable for environments found in coal liquid upgrading. In this project we will evaluate the performance of Sol-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated.

  19. Future of the CMS Muon System Upgrades and Aging

    CERN Document Server

    Pilot, Justin Robert

    2016-01-01

    The CMS detector currently includes three different muon detector types drift tubes (DT) in the central region, cathode strip chambers (CSC) in the forward regions, and resistive plate chambers (RPC) in both the forward and central regions. Several upgrade projects are planned to maintain high data-taking efficiency with the planned running conditions for the high-luminosity upgrade of the LHC. These upgrades are designed to ensure detector longevity and increase redundancy, while mitigating rate increases and retaining sensitivity to phyics processes. This involves changes to electronics and infrastructure of existing detectors, and adding new detectors in the forward region of the CMS experiment. Plans for each of the muon subsystems are described here in the context of the Phase-II upgrade schedule of the CMS experiment.

  20. High temperature ceramic membrane reactors for coal liquid upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-06-19

    Ceramic membranes are a new class of materials, which have shown promise in a variety of industrial applications. Their mechanical and chemical stability coupled with a wide range of operating temperatures and pressures make them suitable for environments found in coal liquid upgrading. In this project we will evaluate the performance of Sel-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated.

  1. High temperature ceramic membrane reactors for coal liquid upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-06-19

    Ceramic membranes are a new class of materials, which have shown promise in a variety of industrial applications. Their mechanical and chemical stability coupled with a wide range of operating temperatures and pressures make them suitable for environments found in coal liquid upgrading. In this project we will evaluate the performance of Sel-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will also be investigated.

  2. Upgrade trigger: Biannual performance update

    CERN Document Server

    Aaij, Roel; Couturier, Ben; Esen, Sevda; De Cian, Michel; De Vries, Jacco Andreas; Dziurda, Agnieszka; Fitzpatrick, Conor; Fontana, Marianna; Grillo, Lucia; Hasse, Christoph; Jones, Christopher Rob; Le Gac, Renaud; Matev, Rosen; Neufeld, Niko; Nikodem, Thomas; Polci, Francesco; Del Buono, Luigi; Quagliani, Renato; Schwemmer, Rainer; Seyfert, Paul; Stahl, Sascha; Szumlak, Tomasz; Vesterinen, Mika Anton; Wanczyk, Joanna; Williams, Mark Richard James; Yin, Hang; Zacharjasz, Emilia Anna

    2017-01-01

    This document presents the performance of the LHCb Upgrade trigger reconstruction sequence, incorporating changes to the underlying reconstruction algorithms and detector description since the Trigger and Online Upgrade TDR. An updated extrapolation is presented using the most recent example of an Event Filter Farm node.

  3. 12 GeV Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-01-01

    To expand the opportunity for discovery, Jefferson Lab is upgrading its facility by doubling the maximum energy of CEBAF's electron beam from 6 billion electron volts (GeV) to 12 billion electron volts (GeV), constructing a new experimental hall and upgrading its three existing experimental halls.

  4. Slum Upgrading and Health Equity.

    Science.gov (United States)

    Corburn, Jason; Sverdlik, Alice

    2017-03-24

    Informal settlement upgrading is widely recognized for enhancing shelter and promoting economic development, yet its potential to improve health equity is usually overlooked. Almost one in seven people on the planet are expected to reside in urban informal settlements, or slums, by 2030. Slum upgrading is the process of delivering place-based environmental and social improvements to the urban poor, including land tenure, housing, infrastructure, employment, health services and political and social inclusion. The processes and products of slum upgrading can address multiple environmental determinants of health. This paper reviewed urban slum upgrading evaluations from cities across Asia, Africa and Latin America and found that few captured the multiple health benefits of upgrading. With the Sustainable Development Goals (SDGs) focused on improving well-being for billions of city-dwellers, slum upgrading should be viewed as a key strategy to promote health, equitable development and reduce climate change vulnerabilities. We conclude with suggestions for how slum upgrading might more explicitly capture its health benefits, such as through the use of health impact assessment (HIA) and adopting an urban health in all policies (HiAP) framework. Urban slum upgrading must be more explicitly designed, implemented and evaluated to capture its multiple global environmental health benefits.

  5. ISTTOK control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Ivo S., E-mail: ivoc@ipfn.ist.utl.pt; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-10-15

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel{sup ®} Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators.

  6. ATLAS Upgrades for the next Decades

    CERN Document Server

    Gregor, I M; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly fo...

  7. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, Walter

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb$^{-1}$ to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be kept lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tr...

  8. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred \\ifb\\ expected for LHC running to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for...

  9. Proposal to upgrade the MIPP Experiment

    CERN Document Server

    Isenhower, D; Towell, R; Watson, S; Peterson, R J; Baker, W; Carey, D; Christian, D; Demarteau, M; Jensen, D; Johnstone, C; Meyer, H; Raja, R; Ronzhin, A; Solomey, Nickolas; Wester, W; Gutbrod, H H; Peters, K; Feldman, G; Torun, Y; Messier, M D; Paley, J; Akgun, U; Aydin, G; Duru, F; Gülmez, E; Gunaydin, Y; Onel, Y; Penzo, Aldo L; Avdeichikov, V; Leitner, R; Manjavidze, J; Nikitin, V; Rufanov, I; Sisakian, A; Topuria, T; Manley, D M; Löhner, H; Messchendorpfl, J; Gustafson, H R; Longo, M; Nigmanov, T; Rajaram, D; Kruglov, S P; Lopatin, I V; Kozlenko, N G; Kulbardis, A A; Nowinsky, D V; Radkov, A K; Sumachev, V V; Bujak, A; Gutay, L; Godley, A; Mishra, S R; Rosenfeld, C; Dukes, C; Materniak, C; Nelson, K; Norman, A; Desiati, P; Halzen, F; Montaruli, T

    2006-01-01

    The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interctions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and ~20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematic...

  10. Proposal to upgrade the MIPP experiment

    Energy Technology Data Exchange (ETDEWEB)

    Isenhower, D.; Sadler, M.; Towell, R.; Watson, S. [Abilene Christian Univ., TX (United States); Peterson, R. J. [Univ. of Colorado, Boulder, CO (United States); Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Gutbrod, H.; Peters, K. [GSI-Darmstadt (Germany); Feldman, G. [Harvard Univ., Cambridge, MA (United States); Torun, Y. [Illinois Inst. of Technology, Chicago, IL (United States); Messier, M. D.; Paley, J. [Indiana Univ., Bloomington, IN (United States)

    2006-09-01

    The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

  11. Upgrade of the CMS hadron calorimeter for an upgraded LHC

    Science.gov (United States)

    Anderson, Jacob; CMS Hcal Collaboration

    2012-12-01

    The CMS barrel and endcap hadron calorimeters (Hcal) upgrading the current photo-sensors are hybrid photodiodes (HPDs) to meet the demands of the upgraded luminosity of the LHC. A key aspect of the Hcal upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at L1 trigger. The increased segmentation can be achieved by replacing the HPD's with multi-pixel Geiger-mode avalanche photodiodes. The upgraded electronics are required to operate in a harsh environment and are constrained by the existing infrastructure. The proposed solutions span from chip level to system level. They include the development of a new ADC ASIC, the design and testing of higher speed transmitters to handle the increased data volume, the evaluation and use of circuits from other developments, evaluation of commercial FPGAs, better thermal design and improvements in the overall architecture.

  12. The RHIC polarized source upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Zelenski, A.; Atoian, G.; Davydenko, V.; Ivanov, A.; Kolmogorov, A.; Ritter, J.; Steski, D.; Zubets, V.

    2010-09-27

    The RHIC polarized H{sup -} ion source is being upgraded to higher intensity (5-10 mA) and polarization for use in the RHIC polarization physics program at enhanced luminosity RHIC operation. The higher beam peak intensity will allow reduction of the transverse beam emittance at injection to AGS to reduce polarization losses in AGS. There is also a planned RHIC luminosity upgrade by using the electron beam lens to compensate the beam-beam interaction at collision points. This upgrade is also essential for future BNL plans for a high-luminosity electron - proton (ion) Collider eRHIC.

  13. AC-130H Gunship Armor Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Shell, T.E.; Landingham, R.L.

    1990-09-19

    This report covers the test methods and equipment for testing aircraft armor both hard and soft. The hard armor are the typical ceramic type while the soft armor are various types of layered composite materials. 10 figs. (JEF)

  14. The LHCb Upgrade

    CERN Document Server

    Gallas, A

    2012-01-01

    The LHCb experiment is designed to perform high-precision measurements of CP violation and search for New Physics using the enormous flux of beauty and charmed hadrons produced at the LHC. The LHCb detector is a single-arm spectrometer with excellent tracking and particle identification capabilities. The operation and the results obtained from the data collected in 2010 and 2011 demonstrate that the detector is robust and functioning very well. In the next years, LHCb will measure a large number of interesting channels in heavy flavor decays. However, the limit of 1 fb−1 of data per year cannot be overcome without improving the detector. An upgraded spectrometer with a 40MHz readout and a much more flexible software-based triggering system will increase the data rate as well as the efficiency specially in the hadronic channels, widening our physics scope beyond that of heavy flavor. Here, the different possibilities under study for the different detectors are reviewed as well as the ongoing R&D activiti...

  15. Upgrade of the MAGIC telescopes

    CERN Document Server

    Mazin, Daniel; Garczarczyk, Markus; Giavitto, Gianluca; Sitarek, Julian

    2014-01-01

    The MAGIC telescopes are two Imaging Atmospheric Cherenkov Telescopes (IACTs) located on the Canary island of La Palma. With 17m diameter mirror dishes and ultra-fast electronics, they provide an energy threshold as low as 50 GeV for observations at low zenith angles. The first MAGIC telescope was taken in operation in 2004 whereas the second one joined in 2009. In 2011 we started a major upgrade program to improve and to unify the stereoscopic system of the two similar but at that time different telescopes. Here we report on the upgrade of the readout electronics and digital trigger of the two telescopes, the upgrade of the camera of the MAGIC I telescope as well as the commissioning of the system after this major upgrade.

  16. D0 Upgrade for RUN II

    CERN Document Server

    Petroff, P

    1999-01-01

    The D0 detector at The Fermilab Tevatron is undergoing a major upgrade to prepare for data taking with luminosities reaching 2 x 10^{32} cm^{-2} s^{-1}. The upgrade includes a new central tracking array, new muon detector components and electronic upgrades to many subsystems. The D0 upgraded detector will be operational for RUN II in spring 2000.

  17. Participatory slum upgrading as a disjunctive process in Recife, Brazil

    NARCIS (Netherlands)

    Vries, de Pieter

    2016-01-01

    This article engages with the coproduction of urban space by focusing on a slum upgrading project in Recife, Brazil. It argues that the urban situation is essentially inconsistent, unpredictable and unstable. It documents the history of urban planning in Recife, paying special attention to the co

  18. User and Performance Impacts from Franklin Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    He, Yun (Helen)

    2009-05-10

    The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

  19. IPNS upgrade: A feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  20. The CDF and D-zero B physics upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Maciel, A.K.A.

    1997-06-01

    The CDF and D0 detector upgrades are reviewed with an emphasis on their B physics capabilities. Projections for the observability of CP- violation and for the resolution of rapid B{sub s} oscillations are made, based on upgrade simulations and on CDF performance from the last run. It is shown that measurements of sin(2{beta}) and sin(2{alpha}) can be achieved with uncertainties less than 0.15. For fully reconstructed (non-leptonic) B{sub s} decays, both detectors have vertexing and momentum determination able to resolve x{sub s}{approximately}20.

  1. The upgraded MAGIC Cherenkov telescopes

    Energy Technology Data Exchange (ETDEWEB)

    Tescaro, D., E-mail: dtescaro@iac.es [Instituto de Astrofísica de Canarias (IAC), E-38205 La Laguna, Tenerife (Spain); Universidad de La Laguna (ULL), Dept. Astrofísica, E-38206 La Laguna, Tenerife (Spain)

    2014-12-01

    The MAGIC Cherenkov telescopes underwent a major upgrade in 2011 and 2012. A new 1039-pixel camera and a larger area digital trigger system were installed in MAGIC-I, making it essentially identical to the newer MAGIC-II telescope. The readout systems of both telescopes were also upgraded, with fully programmable receiver boards and DRS4-chip-based digitization systems. The upgrade eased the operation and maintenance of the telescopes and also improved significantly their performance. The system has now an integral sensitivity as good as 0.6% of the Crab Nebula flux (for E>400GeV), with an effective analysis threshold at 70 GeV. This allows MAGIC to secure one of the leading roles among the current major ground-based Imaging Atmospheric Cherenkov telescopes for the next 5–10 years. - Highlights: • In 2011 and 2012 the MAGIC telescopes underwent a two-stage major upgrade. • The new camera of MAGIC-I allows us to exploit a 1.4 larger trigger area. • The novel DRS4-based readout systems allow a cost-effective ultra-fast digitization. • The upgrade greatly improved the maintainability of the system. • MAGIC has now an optimal integral sensitivity of 0.6% of the Crab Nebula flux.

  2. Status of the CMS Phase I pixel detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Spannagel, S., E-mail: simon.spannagel@desy.de

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  3. Status of the CMS Phase I Pixel Detector Upgrade

    CERN Document Server

    AUTHOR|(CDS)2083994

    2016-01-01

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  4. High temperature ceramic membrane reactors for coal liquid upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-01-01

    Membrane reactors have been used in a number of catalytic reaction processes in order to overcome the limitations on conversion imposed by thermodynamic equilibrium. Having the inherent capability for combining reaction and separation in a single step, they offer promise for improving and optimizing yield, selectivity and performance of processes involving complex liquids, such as these typically found in coal liquid upgrading. Ceramic membranes are a new class of materials, which have shown promise in a variety of industrial applications. Their mechanical and chemical stability coupled with a wide range of operating temperatures and pressures make them suitable for environments found in coal liquid upgrading. This project will evaluate the performance of Sol-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. Development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated.

  5. AliPDU Upgrade

    CERN Document Server

    Mhlanga, Sibaliso

    2014-01-01

    A power distribution unit (PDU) is a device used in data centres to distribute AC power to multiple servers and other equipment. Power distribution units (PDUs) can be managed remotely via the Web browser or other management console, causing outlets to be turned on and off at prescribed times and in a proper sequence for shutting down and powering up equipment. The task in this project was to create as many PDUs on one click and customize them.

  6. Upgrade trigger: Bandwidth strategy proposal

    CERN Document Server

    Boettcher, Thomas Julian; Meloni, Simone; Whitehead, Mark Peter; Williams, Mark Richard James

    2017-01-01

    This document describes a proposed selection strategy for the upgrade trigger using charm signals as a benchmark. The Upgrade trigger uses a 'Run2-like' sequence consisting of a first and second stage, in between which the calibration and alignment is performed. The first stage, HLT1, uses an inclusive strategy to select beauty and charm, while the second stage uses offline-quality exclusive selections. A novel genetic algorithm-based bandwidth division is performed at the second stage to maximise the output of useful physics events, and a range of possible signal efficiencies are presented as a function of the available bandwidth.

  7. Upgrade trigger: Bandwidth strategy proposal

    CERN Document Server

    Fitzpatrick, Conor; Meloni, Simone; Boettcher, Thomas Julian; Whitehead, Mark Peter; Dziurda, Agnieszka; Vesterinen, Mika Anton

    2017-01-01

    This document describes a selection strategy for the upgrade trigger using charm signals as a benchmark. The Upgrade trigger uses a 'Run 2-like' sequence consisting of a first and second stage, in between which the calibration and alignment is performed. The first stage, HLT1, uses an inclusive strategy to select beauty and charm decays, while the second stage uses offline-quality exclusive selections. A novel genetic algorithm-based bandwidth division is performed at the second stage to distribute the output bandwidth among different physics channels, maximising the efficiency for useful physics events. The performance is then studied as a function of the available output bandwidth.

  8. Lhasa Airport Gets Upgrade

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    On November 12, Gonggar Airport in Lhasa, capital of southwest China’s Tibet Autonomous Region, ended its 43-year history of not being able to handle night flights with a passenger jet bound for Chengdu City in neighboring Sichuan Province, taking off at 7:50 p.m.The progress is the result of a $150-million navigation lighting project that the airport completed in June.Gonggar Airport, situated 3,600 meters above sea level, is one of the world’shighest airports. It began operation in March 1956. After an expansion projectin 2001 -03, the airport can now handle 1.1 million passengers every year.

  9. High temperature ceramic membrane reactors for coal liquid upgrading. Quarterly report No. 1, September 21, 1989--December 20, 1989

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-06-19

    In this project we well evaluate the performance of Sel-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated. (VC)

  10. ATLAS detector upgrade plans and perspectives

    CERN Document Server

    Salzburger, A; The ATLAS collaboration

    2011-01-01

    With the LHC collecting first data at 7 TeV, plans are already advancing for a series of upgrades leading eventually to about five times the LHC design-luminosity some 10 years from now in the high luminosity LHC (HL-LHC) project. The goal is to extend the data set from about 300 fb-1 proposed for LHC running to 3000 fb-1 by around 2030. Coping with the high instantaneous and integrated luminosity will require many changes to the ATLAS detector. ATLAS is planning a multi-phase detector upgrade procedure, starting with initial modifications of the existing detector setup as early as 2013 towards large scale replacements of detector components during later shut down periods. The designs are developing rapidly for an all-new inner-tracker, big changes in the calorimeter and muon systems, as well as improved triggers. This talk summarises the environment expected at the HL-LHC and the status of the improvements to the ATLAS detector.

  11. CEBAF Upgrade: Cryomodule Performance And Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

    2014-02-01

    The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

  12. CMS Phase II Upgrade Scope Document

    CERN Document Server

    Butler, J; Klute, M; Mans, J; Silvestris, L; on behalf of the CMS, Collaboration; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    The High-Luminosity LHC (HL-LHC) has been identified as the highest priority program in High Energy Physics by both the European Strategy Group and the US Particle Physics Project Prioritization Panel. To fulfil the full potential of this program, which includes the study of the nature of the Higgs boson, the investigation of the properties of any newly discovered particles in the upcoming LHC runs, and the extension of the mass reach for further discoveries, an integrated luminosity of 3000 fb-1 will have to be accumulated by the end of the program. In preparation for operation at the HL-LHC , CMS has documented the necessary upgrades and their expected costs in a Technical Proposal submitted to the CERN LHC Committee (LHCC) in mid-2015. The material presented in the current “Scope Document” provides additional information to assist the LHCC and the CERN Resource Review Board (RRB) in their review of the CMS upgrade. The document commences with a summary of the process followed to develop the scope of t...

  13. Upgrading of the West Area

    CERN Multimedia

    1983-01-01

    The rejigged main hall (EHW1) in the West Area: on background, below the crane, is the brown yoke of the Omega magnet which had been resited. The upgrading was completed by the time in July when 400 GeV protons arrived. See Annual Report 1983 p. 107.

  14. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Zohm, H.; Adamek, J.; Angioni, C.

    2009-01-01

    ASDEX Upgrade was operated with a fully W-covered wall in 2007 and 2008. Stationary H-modes at the ITER target values and improved H-modes with H up to 1.2 were run without any boronization. The boundary conditions set by the full W wall (high enough ELM frequency, high enough central heating and...

  15. ATLAS Detector : Performance and Upgrades

    CERN Document Server

    Oliveira Damazio, Denis; The ATLAS collaboration

    2016-01-01

    Describe the ATLAS detector and summarize most relevant and recent information about the detector performance in 2016 with LHC colliding bunches at sqrt(s)=13 TeV with luminosity above the nominal value. Describe the different upgrade phases previewed for the detector and main activities already ongoing.

  16. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Amdor, C.; Angioni, C.; Balden, M.; Bardin, S.; L. Barrera Orte,; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Birkenmeier, G.; Bobkov, V.; Boom, J.; Bottereau, C.; Bottino, A.; Braun, F.; Brezinsek, S.; Brochard, T.; M. Brüdgam,; Buhler, A.; Burckhart, A.; Casson, F. J.; Chankin, A.; Chapman, I.; Clairet, F.; Classen, I.G.J.; Coenen, J. W.; Conway, G. D.; Coster, D. P.; Curran, D.; da Silva, F.; P. de Marné,; D' Inca, R.; Douai, D.; Drube, R.; Dunne, M.; Dux, R.; Eich, T.; Eixenberger, H.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fischer, R.; H. Fünfgelder,; Fuchs, J. C.; K. Gál,; M. García Muñoz,; Geiger, B.; Giannone, L.; T. Görler,; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Guimarais, L.; S. Günter,; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; T. Härtl,; Hauff, T.; Heinemann, B.; Herrmann, A.; Hobirk, J.; H. Höhnle,; M. Hölzl,; Hopf, C.; Houben, A.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kantor, M.; C.-P. Käsemann,; Kallenbach, A.; S. Kálvin,; Kantor, M.; Kappatou, A.; Kardaun, O.; Kasparek, W.; Kaufmann, M.; Kirk, A.; H.-J. Klingshirn,; Kocan, M.; Kocsis, G.; Konz, C.; Koslowski, R.; Krieger, K.; Kubic, M.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Lazaros, A.; Leipold, F.; Leuterer, F.; Lindig, S.; Lisgo, S.; Lohs, A.; Lunt, T.; Maier, H.; Makkonen, T.; Mank, K.; M.-E. Manso,; Maraschek, M.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Mehlmann, F.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Müller, S.; H.W. Müller,; M. Münich,; Neu, G.; Neu, R.; Neuwirth, D.; Nocente, M.; Nold, B.; Noterdaeme, J. M.; Pautasso, G.; Pereverzev, G.; B. Plöckl,; Podoba, Y.; Pompon, F.; Poli, E.; Polozhiy, K.; Potzel, S.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reimold, F.; Ribeiro, T.; Riedl, R.; Rohde, V.; van Rooij, G. J.; Roth, J.; Rott, M.; Ryter, F.; Salewski, M.; Santos, J.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schrittwieser, R.; Schubert, M.; Schweinzer, J.; Scott, B.; Sempf, M.; Sertoli, M.; Siccinio, M.; Sieglin, B.; Sigalov, A.; Silva, A.; Sommer, F.; A. Stäbler,; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Tala, T.; Tardini, G.; Teschke, M.; Tichmann, C.; Told, D.; Treutterer, W.; Tsalas, M.; VanZeeland, M. A.; Varela, P.; Veres, G.; Vicente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Viola, B.; Vorpahl, C.; Wachowski, M.; Wagner, D.; Wauters, T.; Weller, A.; Wenninger, R.; Wieland, B.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; E. Würsching,; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron reso

  17. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Kallenbach, A.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Angioni, C.; Atanasiu, C. V.; Balden, M.; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Bobkov, V.; Boom, J.; Bottino, A.; Braun, F.; Brudgam, M.; Buhler, A.; Burckhart, A.; Chankin, A.; Classen, I.G.J.; Conway, G. D.; Coster, D. P.; de Marne, P.; D' Inca, R.; Drube, R.; Dux, R.; Eich, T.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fahrbach, H. U.; Fattorini, L.; Fischer, R.; Flaws, A.; Funfgelder, H.; Fuchs, J. C.; Gal, K.; Munoz, M. G.; Geiger, B.; Adamov, M. G.; Giannone, L.; Giroud, C.; Gorler, T.; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Gunter, S.; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; Hauff, T.; Heinemann, B.; Herrmann, A.; Hicks, N.; Hobirk, J.; Hohnle, H.; Holzl, M.; Hopf, C.; Horton, L.; Huart, M.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kasemann, C. P.; Kalvin, S.; Kardaun, O.; Kaufmann, M.; Kirk, A.; Klingshirn, H. J.; Kocan, M.; Kocsis, G.; Kollotzek, H.; Konz, C.; Koslowski, R.; Krieger, K.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Leipold, F.; Leuterer, F.; Lohs, A.; N C Luhmann Jr.,; Lunt, T.; Lyssoivan, A.; Maier, H.; Maggi, C.; Mank, K.; Manso, M. E.; Maraschek, M.; Martin, P.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Muller, H. W.; Munich, M.; Murmann, H.; Neu, G.; Neu, R.; Nold, B.; Noterdaeme, J. M.; Park, H. K.; Pautasso, G.; Pereverzev, G.; Podoba, Y.; Pompon, F.; Poli, E.; Polochiy, K.; Potzel, S.; Prechtl, M.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reiter, B.; Ribeiro, T.; Riedl, R.; Rohde, V.; Roth, J.; Rott, M.; Ryter, F.; Sandmann, W.; Santos, J.; Sassenberg, K.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schramm, G.; Schrittwieser, R.; Schweinzer, J.; Scott, B.; Sempf, M.; Serra, F.; Sertoli, M.; Siccinio, M.; Sigalov, A.; Silva, A.; Sips, A.C.C.; Sommer, F.; Stabler, A.; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Szepesi, T.; Tardini, G.; Tichmann, C.; Told, D.; Treutterer, W.; Urso, L.; Varela, P.; Vincente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Vorpahl, C.; Wagner, D.; Weller, A.; Wenninger, R.; Wieland, B.; Wigger, C.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; Wursching, E.; Yadikin, D.; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2011-01-01

    The ASDEX Upgrade programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. After the finalization of the tungsten coating of the plasma facing components, the re-availabil

  18. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Amdor, C.; Angioni, C.; Balden, M.; Bardin, S.; L. Barrera Orte,; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Birkenmeier, G.; Bobkov, V.; Boom, J.; Bottereau, C.; Bottino, A.; Braun, F.; Brezinsek, S.; Brochard, T.; M. Brüdgam,; Buhler, A.; Burckhart, A.; Casson, F. J.; Chankin, A.; Chapman, I.; Clairet, F.; Classen, I.G.J.; Coenen, J. W.; Conway, G. D.; Coster, D. P.; Curran, D.; da Silva, F.; P. de Marné,; D' Inca, R.; Douai, D.; Drube, R.; Dunne, M.; Dux, R.; Eich, T.; Eixenberger, H.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fischer, R.; H. Fünfgelder,; Fuchs, J. C.; K. Gál,; M. García Muñoz,; Geiger, B.; Giannone, L.; T. Görler,; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Guimarais, L.; S. Günter,; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; T. Härtl,; Hauff, T.; Heinemann, B.; Herrmann, A.; Hobirk, J.; H. Höhnle,; M. Hölzl,; Hopf, C.; Houben, A.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kantor, M.; C.-P. Käsemann,; Kallenbach, A.; S. Kálvin,; Kantor, M.; Kappatou, A.; Kardaun, O.; Kasparek, W.; Kaufmann, M.; Kirk, A.; H.-J. Klingshirn,; Kocan, M.; Kocsis, G.; Konz, C.; Koslowski, R.; Krieger, K.; Kubic, M.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Lazaros, A.; Leipold, F.; Leuterer, F.; Lindig, S.; Lisgo, S.; Lohs, A.; Lunt, T.; Maier, H.; Makkonen, T.; Mank, K.; M.-E. Manso,; Maraschek, M.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Mehlmann, F.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Müller, S.; H.W. Müller,; M. Münich,; Neu, G.; Neu, R.; Neuwirth, D.; Nocente, M.; Nold, B.; Noterdaeme, J. M.; Pautasso, G.; Pereverzev, G.; B. Plöckl,; Podoba, Y.; Pompon, F.; Poli, E.; Polozhiy, K.; Potzel, S.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reimold, F.; Ribeiro, T.; Riedl, R.; Rohde, V.; van Rooij, G. J.; Roth, J.; Rott, M.; Ryter, F.; Salewski, M.; Santos, J.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schrittwieser, R.; Schubert, M.; Schweinzer, J.; Scott, B.; Sempf, M.; Sertoli, M.; Siccinio, M.; Sieglin, B.; Sigalov, A.; Silva, A.; Sommer, F.; A. Stäbler,; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Tala, T.; Tardini, G.; Teschke, M.; Tichmann, C.; Told, D.; Treutterer, W.; Tsalas, M.; VanZeeland, M. A.; Varela, P.; Veres, G.; Vicente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Viola, B.; Vorpahl, C.; Wachowski, M.; Wagner, D.; Wauters, T.; Weller, A.; Wenninger, R.; Wieland, B.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; E. Würsching,; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron reso

  19. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Kallenbach, A.; Adamek, J.; Aho-Mantila, L.

    2011-01-01

    The ASDEX Upgrade programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. After the finalization of the tungsten coating of the plasma facing components, the re-availa...

  20. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron r...

  1. The fast readout system for the MAPMTs of COMPASS RICH-1

    CERN Document Server

    Abbon, P; Angerer, H; Birsa, R; Bordalo, P; Bradamante, Franco; Bressan, A; Chiosso, M; Ciliberti, P; Colantoni, M L; Dafni, T; Dalla Torre, S; Delagnes, E; Denisov, O; Deschamps, H; Díaz, V; Dibiase, N; Duic, V; Eyrich, W; Ferrero, A; Finger, M; Finger, M Jr; Fischer, H; Gerassimov, S; Giorgi, M; Gobbo, B; Hagemann, R; Von Harrach, D; Heinsius, F H; Joosten, R; Ketzer, B; Kolosov, V N; Königsmann, K C; Konorov, I; Kramer, Daniel; Kunne, F; Lehmann, A; Levorato, S; Maggiora, A; Magnon, A; Mann, A; Martin, A; Menon, G; Mutter, A; Nähle, O; Nerling, F; Neyret, D; Panzieri, D; Paul, S; Pesaro, G; Pizzolotto, C; Polak, J; Rebourgeard, P; Robinet, F; Rocco, E; Schiavon, P; Schill, C; Schoenmeier, P; Schröder, W; Silva, L; Slunecka, M; Sozzi, F; Steiger, L; Sulc, M; Svec, M; Takekawa, S; Tessarotto, F; Teufel, A; Wollny, H

    2008-01-01

    A fast readout system for the upgrade of the COMPASS RICH detector has been developed and successfully used for data taking in 2006 and 2007. The new readout system for the multi-anode PMTs in the central part of the photon detector of the RICH is based on the high-sensitivity MAD4 preamplifier-discriminator and the dead-time free F1-TDC chip characterized by high-resolution. The readout electronics has been designed taking into account the high photon flux in the central part of the detector and the requirement to run at high trigger rates up to 100 kHz with negligible dead-time. The system is designed in a very compact setup and mounted directly in front of the multi-anode photomultipliers. The data are digitized on the frontend boards and transferred via optical links to the readout system. The read-out electronics system is described in detail together with its measured performances.

  2. High temperature ceramic membrane reactors for coal liquid upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-01-01

    In this project we will study a novel process concept, i.e., the use of ceramic membrane reactors in upgrading of coal model compounds and coal derived liquids. In general terms, the USC research team is responsible for constructing and operating the membrane reactor apparatus and for testing various inorganic membranes for the upgrading of coal derived asphaltenes and coal model compounds. The USC effort will involve the principal investigator of this project and two graduate research assistants. The ALCOA team is responsible for the preparation of the inorganic membranes, for construction and testing of the ceramic membrane modules, and for measurement of their transport properties. The ALCOA research effort will involve Dr. Paul K. T. Liu, who is the project manager of the ALCOA research team, an engineer and a technician. UNOCAL's contribution will be limited to overall technical assistance in catalyst preparation and the operation of the laboratory upgrading membrane reactor and for analytical back-up and expertise in oil analysis and materials characterization. UNOCAL is a no-cost contractor but will be involved in all aspects of the project, as deemed appropriate.

  3. ATLAS Upgrade for the HL-LHC

    CERN Document Server

    Oakham, F G; The ATLAS collaboration

    2012-01-01

    With the LHC successfully collecting data at 7 TeV, plans are actively advancing for a series of upgrades leading eventually to about five times the LHC design-luminosity some 10 years from now in the high luminosity LHC (HL-LHC) project. The goal is to extend the data set from about 300 fb-1 proposed for LHC running to 3000 fb-1 by around 2030. Coping with the high instantaneous and integrated luminosity will require many changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, big changes in the calorimeter and muon systems, as well as improved triggers. This talk summarises the environment expected at the HL-LHC and the status of various improvements to the ATLAS detector.

  4. ACAB software upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Sanz, J.; Balmisa, J.M.

    1997-10-01

    This report address two issues, namely the ``Selection of the most current nuclear data libraries available`` and the ``User`s manual of the updated ACAB code``. A general summary of the major features of ACAB is provides in Section 1 which highlights the new capabilities included in the present version of ACAB. We address the issue of the nuclear data libraries selected as starting point in preparing the libraries to be used directly by ACAB. Section II describes the main features of the selected libraries. In Section IV, the impact of using these libraries in Inertial Fusion Energy, IFE, applications is assessed by comparing activation results obtained using different activation cross-sections data libraries. The points considered are the processing of libraries and libraries adapted to be directly read by ACAB. The ``processing`` efforts made within the frame of this project have been focused on the COLLAPSE code. Important modifications have been made, and in Section IV we provide an overall description of the new version. The content of the data bases employed by the updated ACAB code are described in Section V. The input data file for running ACAB is dealt with in Section VI, and some example problems are discussed in Section VII. Finally, regarding analysis of activation results we described in Section VIII the updated version of the CHAINS code.

  5. Take control of upgrading to Leopard

    CERN Document Server

    Kissell, Joe

    2009-01-01

    Start on the right foot with Mac OS X 10.5 Leopard! Little is more exciting and unnerving than a major operating system upgrade for your Mac, but thousands of people have upgraded to Panther and Tiger calmly and successfully with the advice in Joe Kissell's previous hit Take Control of Upgrading... titles. Joe's expert guidance, developed over innumerable test installations, walks you through the six steps necessary before upgrading, which of Leopard's three installation options is right for you, how to perform the actual upgrade, and post-installation checking and cleanup.

  6. Upgraded fuel from reed canary grass

    Energy Technology Data Exchange (ETDEWEB)

    Heiskanen, V.P.

    1995-12-31

    The feasibility of RCG for commercial utilization depends primarily on its applicability for pulp production and its use in energy production will be based on the residue that will be available after extracting the pulp fraction of the RCG. Roughly 20 ..30% of the material will be available for energy production purposes. However, the percentage may be higher/lower depending on the quality standards of the pulp fiber material. The harvesting period has a significant effect on the fuel characteristics of RCG. For instance the contents of N, S, Cl, K are clearly lower if the RCG is harvested in the spring (delayed) instead of summer/autumn. These elements affect significantly overall emission formation and ash behaviour and its melting temperature. The combustion related research in this project has been focused on the spring-harvested RCG. The project aims to evaluate the feasibility of delayed harvested RCG for energy production. In order to reach this goal, the following combustion methods will be tested and studied: combustion of pelletized RCG; gasification; combustion of pulverized RCG. In addition, pelletizing, reactivity and NO conversion of pulverized RCG will be studied. The research described here is a part of `Reed Canary Grass` project (in AIR programme). The contractors of the project are Swedish University of Agricultural Sciences (coordinator), United Milling Systems from Denmark, Jaakko Poeyry Oy and VTT Energy. In addition, there are partners from several countries participating in the project. The project has been divided in five tasks, VTT Energy being responsible for combustion related task `Upgraded fuel` that includes the research topics discussed in this paper

  7. Injection Protection Upgrade for the HL-LHC

    CERN Document Server

    AUTHOR|(CDS)2067108; Biancacci, Nicolo; Bracco, Chiara; Frasciello, Oscar; Gentini, Luca; Goddard, Brennan; Lechner, Anton; Maciariello, Fausto; Perillo Marcone, Antonio; Salvant, Benoit; Shetty, Nikhil Vittal; Steele, Genevieve; Velotti, Francesco; Zobov, Mikhail

    2015-01-01

    The injector complex of the LHC is undergoing important changes in the light of the LIU project to provide brighter beams to the LHC. For this reason and as part of the High Luminosity LHC project the injection protection system of the LHC will be upgraded in the Long Shutdown 2 (2018 - 2019) to be able to protect downstream elements against injection failures with the high brightness, high intensity HL-LHC beams. The upgraded LHC injection protection system will consist of a segmented injection protection absorber TDIS, and auxiliary collimators and masks. The layout modifications are described, and the machine element protection and absorber jaw robustness studies are presented for the new systems.

  8. Hangout with CERN: Upgrading with TALENT (S03E08)

    CERN Multimedia

    Kahle, Kate

    2013-01-01

    The world's largest particle accelerator, CERN's Large Hadron Collider (LHC), is preparing to run at higher energies. With collisions on hold, engineers and physicists are busy consolidating and upgrading the accelerator, the experiments and more.In this week's hangout, researchers from the TALENT project give us an insight into their work to help upgrade the ATLAS detector. Find out how cutting-edge engineering, software and physics analysis are working together to make a gigantic detector even greater!Host ATLAS physicist Steven Goldfarb is joined by fellow ATLAS physicist Mar Capeans Garrido, as well as TALENT project Marie Curie fellows: software engineer Rafael Tedin Alvarez from Atostek Oy and physicists Laura Franconi from the University of Oslo and Arno E. Kompatscher from CiS, with Marzena Lapka from the CMS Experiment monitoring social media.TALENT is an Initial Training Network funded by the European Commission's Seventh Framework Programme, with 17 researchers at the start of their careers working...

  9. Lattice and emittance optimization techniques and the ALS brightness upgrade

    Science.gov (United States)

    Steier, C.; Madur, A.; Nishimura, H.; Robin, D.; Sannibale, F.; Sun, C.; Wan, W.; Yang, L.

    2011-09-01

    An upgrade project is under way to further improve the brightness of the Advanced Light Source at Berkeley Lab by reducing its horizontal emittance from 6.3 to 2.2 nm (effective emittance in the straights from 6.4 to 2.5 nm). This will result in a brightness increase by a factor of three for bend magnet beamlines and at least a factor of two for insertion device beamlines and will keep the ALS competitive with newer sources. This paper presents an overview of the upgrade project with emphasis on the nonlinear beam dynamics simulations. It also discusses in a more general way the techniques used at LBNL for finding optimum lattices (e.g. the ones with maximum brightness) and optimizing the particle dynamics, thereby increasing beam lifetime and stability.

  10. Tevatron Beam Position Monitor Upgrade

    CERN Document Server

    Wolbers, Stephen; Barker, B; Bledsoe, S; Boes, T; Bowden, Mark; Cancelo, Gugstavo I; Dürling, G; Forster, B; Haynes, B; Hendricks, B; Kasza, T; Kutschke, Robert K; Mahlum, R; Martens, Michael A; Mengel, M; Olsen, M; Pavlicek, V; Pham, T; Piccoli, Luciano; Steimel, Jim; Treptow, K; Votava, Margaret; Webber, Robert C; West, B; Zhang, D

    2005-01-01

    The Tevatron Beam Position Monitor (BPM) readout electronics and software have been upgraded to improve measurement precision, functionality and reliability. The original system, designed and built in the early 1980s, became inadequate for current and future operations of the Tevatron. The upgraded system consists of 960 channels of new electronics to process analog signals from 240 BPMs, new front-end software, new online and controls software, and modified applications to take advantage of the improved measurements and support the new functionality. The new system reads signals from both ends of the existing directional stripline pickups to provide simultaneous proton and antiproton position measurements. Measurements using the new system are presented that demonstrate its improved resolution and overall performance.

  11. Hydrogen assisted biological biogas upgrading

    DEFF Research Database (Denmark)

    Bassani, Ilaria

    , produced by water electrolysis, using excess of electricity from wind mills, is coupled with the CO2 contained in the biogas to convert them to CH4. This process is defined as biological biogas upgrading and is carried out by hydrogenotrophic methanogenic archaea that couples CO2 with H2 to produce...... of several recurrent microbial groups, including resilient methanogenic archaea such as Methanoculleus and Methanotermobacter and bacteria belonging to phylum Proteobacteria and genus Synthrophomonas. Moreover, upon H2 addition, the concomitant proliferation of hydrogenotrophic methanogens and syntrophic...... bacteria, such as Desulfovibrio, and some Thermoanaerobacteraceae and Syntrophomonadaceae, and the reduction of aceticlastic methanogens and fermentative bacteria state the role of the H2 moving biomethanation process toward the final steps stimulating CO2 consumption and therefore biogas upgrading....

  12. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Lee, Dong Young; Cha, Kyung Ho; Park, Won Man; Song, Soon Ja; Lee, Jung Woon; Oh, In Seok; Moon, Byung Sou; Ham, Chang Shik; Seh, Kyung Won; Joo, Young Chang; Lee, Eui Jin

    1999-12-01

    We developed techniques for upgrading nuclear power plant simulators that lost some function due to aging and obsolescence of parts. This project will provide a guidance for resolving the problems with aged simulators. We transplanted the simulation code operated in Macro-VAX II into the HP workstation with operating system version 10.20. If further research is proceeded, it will be possible to build simulator system on PCs. (author)

  13. Single-shell tank ventilation upgrades needs analysis report

    Energy Technology Data Exchange (ETDEWEB)

    Kriskovich, J.R., Fluor Daniel Hanford

    1997-02-03

    This report was written to comply with the objectives of the Hanford Federal Facility Agreement and Consent Order, Tri-Party Agreement Milestone M-43-03 Provide to the Washington State Department of Ecology and Department of Health the Results of the Single-Shell Tank Ventilation Upgrades Needs Analysis. The needs analysis consists of identifying the current type and status of each single-shell tank ventilation system, identifying current and projected authorization basis requirements, and identifying ventilation system compliance deficiencies.

  14. The Pegasus-Upgrade Experiment

    Science.gov (United States)

    Fonck, R. J.; Bongard, M. W.; Barr, J. L.; Frerichs, H. G.; Lewicki, B. T.; Reusch, J. A.; Schmitz, O.; Winz, G. R.

    2015-11-01

    Tokamak operation at near-unity aspect ratio provides access to advanced tokamak physics at modest parameters. High plasma current is accessible at very low toroidal field. This offers H-mode performance at Te levels that allow use of electrostatic and magnetic probe arrays through the edge pedestal region into the plasma core. An upgrade to the Pegasus ST is planned to exploit these features and pursue unique studies in three areas: local measurements of pedestal and ELM dynamics at Alfvenic timescales; direct measurement of the local plasma response to application of 3D magnetic perturbations with high spectral flexibility; and extension of Local Helicity Injection for nonsolenoidal startup to NSTX-U-relevant confinement and stability regimes. Significant but relatively low-cost upgrades to the facility are proposed: a new centerstack with larger solenoid and 2x the number of toroidal field conductors; a new TF power supply and conversion of the 200 MVA OH power supply to a cascaded multilevel inverter configuration; and installation of an extensive 3D-magnetic perturbation coil system for ELM mitigation and suppression studies. The upgraded facility will provide 0.3 MA plasmas with pulse lengths of 50-100 msec flattop, aspect ratio <1.25, and toroidal field up to 0.4 T. These research activities will be integrated into related efforts on DIII-D and NSTX-U. Work supported by US DOE grant DE-FG02-96ER54375.

  15. UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION

    Energy Technology Data Exchange (ETDEWEB)

    Anna Lee Tonkovich

    2004-01-01

    The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

  16. ATLAS Phase II for the High Luminosity Upgrade

    CERN Document Server

    Huffman, B T; The ATLAS collaboration

    2013-01-01

    After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data acqui...

  17. Recent Upgrade of the Klystron Modulator at SLAC

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

    2011-11-04

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  18. Towards novel biogas upgrading processes

    Energy Technology Data Exchange (ETDEWEB)

    Privalova, E.

    2013-06-01

    Biogas production has considerable development possibilities not only in Finland but all over the world since it it the easiest way of creating value out of various waste fractions and represents an alternative source of renewable energy. Development of efficient biogas upgrading technology has become an important issue since it improves the quality of biogas and for example facilitating its injection into the natural gas pipelines. Moreover, such upgrading contributes to resolving the issue of increasing CO{sub 2} emissions and addresses the increasing climate change concerns. Together with traditional CO{sub 2} capturing technologies a new class of recently emerged sorbents such as ionic liquids is claimed as promising media for gas separations. In this thesis, an extensive comparison of the performance of different solvents in terms of CO{sub 2} capture has been performed. The focus of the present study was on aqueous amine solutions and their mixtures, traditional ionic liquids, 'switchable' ionic liquids and poly(ionic liquid)s in order to reveal the best option for biogas upgrading. The CO{sub 2} capturing efficiency for the most promising solvents achieved values around 50-60 L CO{sub 2}/L absorbent. These values are superior to currently widely applied water wash biogas upgrading system. Regeneration of the solvent mixtures appeared to be challenging since the loss of initial efficiency upon CO{sub 2} release was in excess of 20-40 vol %, especially in the case of aqueous amine solutions. In contrast, some of the ionic liquids displayed reversible behavior. Thus, for selected 'switchable' ionic and poly(ionic liquid)s the CO{sub 2} absorption/regeneration cycles were performed 3-4 times without any notable efficiency decrease. The viscosity issue, typical for ionic liquids upon CO{sub 2} saturation, was addressed and the information obtained was evaluated and related to the ionic interactions. The occurrence of volatile organic compounds

  19. Invensys solution for a complete digital I and C system upgrade for a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Meter, L. [Invensys Process Systems, M/S C42-2A, 33 Commercial Street, Foxboro, MA 02035 (United States)

    2006-07-01

    Currently, Invensys is executing a number of digital I and C upgrade projects (both safety and non-safety related) at a number of US and overseas Nuclear Power Plants (NPP). In addition Invensys is in the final shipment stage of Lungmen, NPP project, where its scope consisted of Balance of Plant Distributed Control Information System (DCIS), including Plant Computer System (PCS). This article describes the approach and details of Invensys DCIS architecture, which is used in parts throughout various upgrade projects as well as in its entirety for a complete NPP DCIS. (authors)

  20. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    Science.gov (United States)

    2015-12-01

    Nautical Miles R&M - Reliability and Maintainability RM - Reference Model TV-1 - Technical Standards Profile Univ . - Universal H-1 Upgrades December 2015...Speed (kts) 165 165 135 139 139 Payload (Hot Day) (lbs) 3500 lbs 3500 lbs 2500 lbs 6 Wing Stations 4 Universal Under Wing Stations 3429 3429 Weapon...Stations Universal Mounts 6 6 4 4 4 Precision Guided Munitions 16 16 12 16 16 Maneuverability/Agility (G’s) -0.5 to +2.5 -0.5 to +2.5 -0.5 to +2.5 -0.5 to

  1. Advanced Accelerator Magnets for Upgrading the LHC

    CERN Document Server

    Rossi, L; de Rijk, G; Todesco, E

    2012-01-01

    The Large Hadron Collider is working at about half its design value, limited by the defective splices of the magnet interconnections. While the full energy will be attained after the splice consolidation in 2014, CERN is preparing a plan for a Luminosity upgrade (High Luminosity LHC) around 2020 and has launched a pre-study for exploring an Energy upgrade (High Energy LHC) around 2030. Both upgrades strongly rely on advanced accelerator magnet technology, requiring dipoles and quadrupoles of accelerator quality and operating fields in the 11-13 T range for the luminosity upgrade and 16-20 T range for the energy upgrade. The paper will review the last ten year of Nb3Sn accelerator magnet R&D and compare it to the needs of the upgrades and will critically assess the results of the Nb3Sn and HTS technology and the planned R&D programs also based on the inputs of first year of LHC operation.

  2. Emission system upgrades for older vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, R.R.; Finkenbiner, K.; Sommerville, R.J.

    1996-09-01

    Thirteen 1975--1980 model year vehicles were equipped with a set of components to upgrade their emission control systems. Each vehicle was tested before maintenance (as-received), after tune-up and correction of original equipment emission system defects (baseline), and after installation of the emission upgrade system (upgrade). Average emissions of non-methane hydrocarbons (NHMC), carbon monoxide (CO), and nitrogen oxides (NOx) with the emission upgrade system installed were reduced more than 60% from the baseline immediately after upgrade. Six of the vehicles accumulated 48,000 kilometers with the upgrade system. After 48,000 kilometers, average emissions of NMHC and NOx were still reduced approximately 50% compared to the baseline and average emissions of CO were reduced approximately 20%.

  3. Upgrade of the LHCb VELO detector

    Science.gov (United States)

    Williams, Mark

    2017-01-01

    The LHCb experiment is a single-arm forward spectrometer optimised for performing heavy-flavour physics analyses, using proton-proton collisions provided by the LHC machine. A major upgrade of the LHCb experiment will take place prior to the start of Run 3 operations in 2021. The upgraded Vertex Locator (VELO) is an essential component of this upgrade. Its main role is to enable high precision track and vertex reconstruction, with data-driven readout to the software trigger at 40 MHz, in the higher-luminosity environment of Run 3. To achieve this goal, significant improvements are planned with respect to the current detector, including a switch from microstrips to pixels, upgraded electronics, and a new cooling system. I will briefly motiviate the need for an upgrade, describe the main aspects of the VELO upgrade design, and show highlights of recent sensor characterisation studies using the CERN SPS test beam.

  4. South Ukraine NPP: Safety improvements through Plant Computer upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Brenman, O. [Westinghouse Electric Company, 4350 Northern Pike, Monroeville, PA 15146 (United States); Chernyshov, M. A. [Westron, LLC, 1 Acad. Proskura St., Kharkiv 61070 (Ukraine); Denning, R. S. [Battelle, 505 King Ave, Columbus, OH 43201 (United States); Kolesov, S. A. [NAEK Energoatom, 3 Vetrov Str., Kiev, 01032 (Ukraine); Balakan, H. H.; Bilyk, B. I.; Kuznetsov, V. I. [PO South Ukraine NPP, NAEK Energoatom, Mylolayv Region, 55000 (Ukraine); Trosman, G. [US Dept. of Energy, International Nuclear Safety Program, Washington, DC 20585 (United States)

    2006-07-01

    This paper summarizes some results of the Plant Computer upgrade at the Units 2 and 3 of South Ukraine Nuclear Power Plant (NPP). A Plant Computer, which is also called the Computer Information System (CIS), is one of the key safety-related systems at VVER-1000 nuclear plants. The main function of the CIS is information support for the plant operators during normal and emergency operational modes. Before this upgrade, South Ukraine NPP operated out-of-date and obsolete systems. This upgrade project wax founded by the U.S. DOE in the framework of the International Nuclear Safety Program (INSP). The most efficient way to improve the quality and reliability of information provided to the plant operator is to upgrade the Human-System Interface (HSI), which is the Upper Level (UL) CIS. The upgrade of the CIS data-acquisition system (DAS), which is the Lower Level (LL) CIS, would have less effect on the unit safety. Generally speaking, the lifetime of the LL CIS is much higher than one of the UL CIS. Unlike Plant Computers at the Western-designed plants, the functionality of the WER-1000 CISs includes a control function (Centralized Protection Testing) and a number of the plant equipment monitoring functions, for example, Protection and Interlock Monitoring and Turbo-Generator Temperature Monitoring. The new system is consistent with a historical migration of the format by which information is presented to the operator away from the traditional graphic displays, for example, Piping and Instrument Diagrams (P and ID's), toward Integral Data displays. The cognitive approach to information presentation is currently limited by some licensing issues, but is adapted to a greater degree with each new system. The paper provides some lessons learned on the management of the international team. (authors)

  5. Superbend upgrade on the Advanced Light Source

    Science.gov (United States)

    Robin, D.; Krupnick, J.; Schlueter, R.; Steier, C.; Marks, S.; Wang, B.; Zbasnik, J.; Benjegerdes, R.; Biocca, A.; Bish, P.; Brown, W.; Byrne, W.; Chen, J.; Decking, W.; DeVries, J.; DeMarco, W. R.; Fahmie, M.; Geyer, A.; Harkins, J.; Henderson, T.; Hinkson, J.; Hoyer, E.; Hull, D.; Jacobson, S.; McDonald, J.; Molinari, P.; Mueller, R.; Nadolski, L.; Nishimura, H.; Nishimura, K.; Ottens, F.; Paterson, J. A.; Pipersky, P.; Portmann, G.; Ritchie, A.; Rossi, S.; Salvant, B.; Scarvie, T.; Schmidt, A.; Spring, J.; Taylor, C.; Thur, W.; Timossi, C.; Wandesforde, A.

    2005-02-01

    The Advanced Light Source (ALS) is a third generation synchrotron light source at Lawrence Berkeley National Laboratory (LBNL). There was an increasing demand for additional high brightness hard X-ray beamlines in the 7-40 keV range, so in August 2001, three 1.3 T normal conducting bending magnets were removed from the storage ring and replaced with 5 T superconducting magnets (Superbends). The radiation produced by these Superbends is an order of magnitude higher in photon brightness and flux at 12 keV, making them excellent sources of hard X-rays for protein crystallography and other hard X-ray applications. The Superbends did not compromise the performance of the facility in the VUV and soft X-ray regions of the spectrum. The Superbends will eventually feed 12 new beam lines, greatly enhancing the facility's capability and capacity in the hard X-ray region. The Superbend project is the biggest upgrade since the ALS storage ring was commissioned in 1993. In this paper we present an overview of the Superbend project, its challenges and the resulting impact on the ALS.

  6. LHC Status and Upgrade Challenges

    Science.gov (United States)

    Smith, Jeffrey

    2009-11-01

    The Large Hadron Collider has had a trying start-up and a challenging operational future lays ahead. Critical to the machine's performance is controlling a beam of particles whose stored energy is equivalent to 80 kg of TNT. Unavoidable beam losses result in energy deposition throughout the machine and without adequate protection this power would result in quenching of the superconducting magnets. A brief overview of the machine layout and principles of operation will be reviewed including a summary of the September 2008 accident. The current status of the LHC, startup schedule and upgrade options to achieve the target luminosity will be presented.

  7. The Upgraded D0 Detector

    CERN Document Server

    Abazov, V M; Abolins, M; Acharya, B S; Adams, D L; Adams, M; Adams, T; Agelou, M; Agram, J L; Ahmed, S N; Ahn, S H; Ahsan, M; Alexeev, G D; Alkhazov, G; Alton, A; Alverson, G; Alves, G A; Anastasoaie, M; Andeen, T; Anderson, J T; Anderson, S; Andrieu, B; Angstadt, R; Anosov, V; Arnoud, Y; Arov, M; Askew, A; Åsman, B; Assis-Jesus, A C S; Atramentov, O; Autermann, C; Avila, C; Babukhadia, L; Bacon, Trevor C; Badaud, F; Baden, A; Baffioni, S; Bagby, L; Baldin, B; Balm, P W; Banerjee, P; Banerjee, S; Barberis, E; Bardon, O; Barg, W; Bargassa, P; Baringer, P; Barnes, C; Barreto, J; Bartlett, J F; Bassler, U; Bhattacharjee, M; Baturitsky, M A; Bauer, D; Bean, A; Baumbaugh, B; Beauceron, S; Begalli, M; Beaudette, F; Begel, M; Bellavance, A; Beri, S B; Bernardi, G; Bernhard, R; Bertram, I; Besançon, M; Besson, A; Beuselinck, R; Beutel, D; Bezzubov, V A; Bhat, P C; Bhatnagar, V; Binder, M; Biscarat, C; Bishoff, A; Black, K M; Blackler, I; Blazey, G; Blekman, F; Blessing, S; Bloch, D; Blumenschein, U; Bockenthein, E; Bodyagin, V; Böhnlein, A; Boeriu, O; Bolton, T A; Bonamy, P; Bonifas, D; Borcherding, F; Borissov, G; Bos, K; Bose, T; Boswell, C; Bowden, M; Brandt, A; Briskin, G; Brock, R; Brooijmans, G; Bross, A; Buchanan, N J; Buchholz, D; Bühler, M; Büscher, V; Burdin, S; Burke, S; Burnett, T H; Busato, E; Buszello, C P; Butler, D; Butler, J M; Cammin, J; Caron, S; Bystrický, J; Canal, L; Canelli, F; Carvalho, W; Casey, B C K; Casey, D; Cason, N M; Castilla-Valdez, H; Chakrabarti, S; Chakraborty, D; Chan, K M; Chandra, A; Chapin, D; Charles, F; Cheu, E; Chevalier, L; Chi, E; Chiche, R; Cho, D K; Choate, R; Choi, S; Choudhary, B; Chopra, S; Christenson, J H; Christiansen, T; Christofek, L; Churin, I; Cisko, G; Claes, D; Clark, A R; Clement, B; Clément, C; Coadou, Y; Colling, D J; Coney, L; Connolly, B; Cooke, M; Cooper, W E; Coppage, D; Corcoran, M; Coss, J; Cothenet, A; Cousinou, M C; Cox, B; Crepe-Renaudin, S; Cristetiu, M; Cummings, M A C; Cutts, D; Da Motta, H; Das, M; Davies, B; Davies, G; Davis, G A; Davis, W; De, K; de Jong, P; De Jong, S J; De La Cruz-Burelo, E; de La Taille, C; De Oliveira Martins, C; Dean, S; Degenhardt, J D; Déliot, F; Delsart, P A; Del Signore, K; De Maat, R; Demarteau, M; Demina, R; Demine, P; Denisov, D; Denisov, S P; Desai, S; Diehl, H T; Diesburg, M; Doets, M; Doidge, M; Dong, H; Doulas, S; Dudko, L V; Duflot, L; Dugad, S R; Duperrin, A; Dvornikov, O; Dyer, J; Dyshkant, A; Eads, M; Edmunds, D; Edwards, T; Ellison, J; Elmsheuser, J; Eltzroth, J T; Elvira, V D; Eno, S; Ermolov, P; Eroshin, O V; Estrada, J; Evans, D; Evans, H; Evdokimov, A; Evdokimov, V N; Fagan, J; Fast, J; Fatakia, S N; Fein, D; Feligioni, L; Ferapontov, A V; Ferbel, T; Ferreira, M J; Fiedler, F; Filthaut, F; Fisher, W; Fisk, H E; Fleck, I; Fitzpatrick, T; Flattum, E; Fleuret, F; Flores, R; Foglesong, J; Fortner, M; Fox, H; Franklin, C; Freeman, W; Fu, S; Fuess, S; Gadfort, T; Galea, C F; Gallas, E; Galyaev, E; Gao, M; García, C; García-Bellido, A; Gardner, J; Gavrilov, V; Gay, A; Gay, P; Gelé, D; Gelhaus, R; Genser, K; Gerber, C E; Gershtein, Yu; Gillberg, D; Geurkov, G; Ginther, G; Gobbi, B; Goldmann, K; Golling, T; Gollub, N; Golovtsov, V L; Gómez, B; Gómez, G; Gómez, R; Goodwin, R W; Gornushkin, Y; Gounder, K; Goussiou, A; Graham, D; Graham, G; Grannis, P D; Gray, K; Greder, S; Green, D R; Green, J; Green, J A; Greenlee, H; Greenwood, Z D; Gregores, E M; Grinstein, S; Gris, P; Grivaz, J F; Groer, L; Grünendahl, S; Grünewald, M W; Gu, W; Guglielmo, J; Sen-Gupta, A; Gurzhev, S N; Gutíerrez, G; Gutíerrez, P; Haas, A; Hadley, N J; Haggard, E; Haggerty, H; Hagopian, S; Hall, I; Hall, R E; Han, C; Han, L; Hance, R; Hanagaki, K; Hanlet, P; Hansen, S; Harder, K; Harel, A; Harrington, R; Hauptman, J M; Hauser, R; Hays, C; Hays, J; Hazen, E; Hebbeker, T; Hebert, C; Hedin, D; Heinmiller, J M; Heinson, A P; Heintz, U; Hensel, C; Hesketh, G; Hildreth, M D; Hirosky, R; Hobbs, J D; Hoeneisen, B; Hohlfeld, M; Hong, S J; Hooper, R; Hou, S; Houben, P; Hu, Y; Huang, J; Huang, Y; Hynek, V; Huffman, D; Iashvili, I; Illingworth, R; Ito, A S; Jabeen, S; Jacquier, Y; Jaffré, M; Jain, S; Jain, V; Jakobs, K; Jayanti, R; Jenkins, A; Jesik, R; Jiang, Y; Johns, K; Johnson, M; Johnson, P; Jonckheere, A; Jonsson, P; Jöstlein, H; Jouravlev, N I; Juárez, M; Juste, A; Kaan, A P; Kado, M; Käfer, D; Kahl, W; Kahn, S; Kajfasz, E; Kalinin, A M; Kalk, J; Kalmani, S D; Karmanov, D; Kasper, J; Katsanos, I; Kau, D; Kaur, R; Ke, Z; Kehoe, R; Kermiche, S; Kesisoglou, S; Khanov, A; Kharchilava, A I; Kharzheev, Yu M; Kim, H; Kim, K H; Kim, T J; Kirsch, N; Klima, B; Klute, M; Kohli, J M; Konrath, J P; Komissarov, E V; Kopal, M; Korablev, V M; Kostritskii, A V; Kotcher, J; Kothari, B; Kotwal, A V; Koubarovsky, A; Kozelov, A V; Kozminski, J; Kryemadhi, A; Kuznetsov, O; Krane, J; Kravchuk, N; Krempetz, K; Krider, J; Krishnaswamy, M R; Krzywdzinski, S; Kubantsev, M A; Kubinski, R; Kuchinsky, N; Kuleshov, S; Kulik, Y; Kumar, A; Kunori, S; Kupco, A; Kurca, T; Kvita, J; Kuznetsov, V E; Kwarciany, R; Lager, S; Lahrichi, N; Landsberg, G L; Larwill, M; Laurens, P; Lavigne, B; Lazoflores, J; Le Bihan, A C; Le Meur, G; Lebrun, P; Lee, S W; Lee, W M; Leflat, A; Leggett, C; Lehner, F; Leitner, R; Leonidopoulos, C; Lévêque, J; Lewis, P; Li, J; Li, Q Z; Li, X; Lima, J G R; Lincoln, D; Lindenmeyer, C; Linn, S L; Linnemann, J; Lipaev, V V; Lipton, R; Litmaath, M; Lizarazo, J; Lobo, L; Lobodenko, A; Lokajícek, M; Lounis, A; Love, P; Lü, J; Lubatti, H J; Lucotte, A; Lueking, L; Luo, C; Lynker, M; Lyon, A L; Machado, E; Maciel, A K A; Madaras, R J; Mättig, P; Magass, C; Magerkurth, A; Magnan, A M; Maity, M; Makovec, N; Mal, P K; Malbouisson, H B; Malik, S; Malyshev, V L; Manakov, V; Mao, H S; Maravin, Y; Markley, D; Markus, M; Marshall, T; Martens, M; Martin, M; Martin-Chassard, G; Mattingly, S E K; Matulik, M; Mayorov, A A; McCarthy, R; McCroskey, R; McKenna, M; McMahon, T; Meder, D; Melanson, H L; Melnitchouk, A S; Mendes, A; Mendoza, D; Mendoza, L; Meng, X; Merekov, Y P; Merkin, M; Merritt, K W; Meyer, A; Meyer, J; Michaut, M; Miao, C; Miettinen, H; Mihalcea, D; Mikhailov, V; Miller, D; Mitrevski, J; Mokhov, N; Molina, J; Mondal, N K; Montgomery, H E; Moore, R W; Moulik, T; Muanza, G S; Mostafa, M; Moua, S; Mulders, M; Mundim, L; Mutaf, Y D; Nagaraj, P; Nagy, E; Naimuddin, M; Nang, F; Narain, M; Narasimhan, V S; Narayanan, A; Naumann, N A; Neal, H A; Negret, J P; Nelson, S; Neuenschwander, R T; Neustroev, P; Nöding, C; Nomerotski, A; Novaes, S F; Nozdrin, A; Nunnemann, T; Nurczyk, A; Nurse, E; O'Dell, V; O'Neil, D C; Oguri, V; Olis, D; Oliveira, N; Olivier, B; Olsen, J; Oshima, N; Oshinowo, B O; Oteroy-Garzon, G J; Padley, P; Papageorgiou, K; Parashar, N; Park, J; Park, S K; Parsons, J; Partridge, R; Parua, N; Patwa, A; Pawloski, G; Perea, P M; Pérez, E; Peters, O; Petroff, P; Petteni, M; Phaf, L; Piegaia, R; Pleier, M A; Podesta-Lerma, P L M; Podstavkov, V M; Pogorelov, Y; Pol, M E; Pompos, A; Polosov, P; Pope, B G; Popkov, E; Porokhovoy, S; Prado da Silva, W L; Pritchard, W; Prokhorov, I; Prosper, H B; Protopopescu, S D; Przybycien, M B; Qian, J; Quadt, A; Quinn, B; Ramberg, E; Ramirez-Gomez, R; Rani, K J; Ranjan, K; Rao, M V S; Rapidis, P A; Rapisarda, S; Raskowski, J; Ratoff, P N; Ray, R E; Reay, N W; Rechenmacher, R; Reddy, L V; Regan, T; Renardy, J F; Reucroft, S; Rha, J; Ridel, M; Rijssenbeek, M; Ripp-Baudot, I; Rizatdinova, F K; Robinson, S; Rodrigues, R F; Roco, M T; Rotolo, C; Royon, C; Rubinov, P; Ruchti, R; Rucinski, R; Rud, V I; Rusakovich, N; Russo, P; Sabirov, B; Sajot, G; Sánchez-Hernández, A; Sanders, M P; Santoro, A; Satyanarayana, B; Savage, G; Sawyer, L; Scanlon, T; Schaile, A D; Schamberger, R D; Scheglov, Y; Schellman, H; Schieferdecker, P; Schmitt, C; Schwanenberger, C; Schukin, A A; Schwartzman, A; Schwienhorst, R; Sen-Gupta, S; Severini, H; Shabalina, E; Shamim, M; Shankar, H C; Shary, V; Shchukin, A A; Sheahan, P; Shephard, W D; Shivpuri, R K; Shishkin, A A; Shpakov, D; Shupe, M; Sidwell, R A; Simák, V; Sirotenko, V I; Skow, D; Skubic, P L; Slattery, P F; Smith, D E; Smith, R P; Smolek, K; Snow, G R; Snow, J; Snyder, S; Söldner-Rembold, S; Song, X; Song, Y; Sonnenschein, L; Sopczak, A; Sorin, V; Sosebee, M; Soustruznik, K; Souza, M; Spartana, N; Spurlock, B; Stanton, N R; Stark, J; Steele, J; Stefanik, A; Steinberg, J L; Steinbruck, G; Stevenson, K; Stolin, V; Stone, A; Stoyanova, D A; Strandberg, J; Strang, M A; Strauss, M; Ströhmer, R; Strom, D; Strovink, M; Stutte, L; Sumowidagdo, S; Sznajder, A; Talby, M; Tentindo-Repond, S; Tamburello, P; Taylor, W; Telford, P; Temple, J; Terentyev, N K; Teterin, V; Thomas, E; Thompson, J; Thooris, B; Titov, M; Toback, D; Tokmenin, V V; Tolian, C; Tomoto, M; Tompkins, D; Toole, T; Torborg, J; Touze, F; Towers, S; Trefzger, T; Trincaz-Duvoid, S; Trippe, T G; Tsybychev, D; Tuchming, B; Tully, C; Turcot, A S; Tuts, P M; Utes, M; Uvarov, L; Uvarov, S; Uzunyan, S; Vachon, B; Van den Berg, P J; Van Gemmeren, P; Van Kooten, R; Van Leeuwen, W M; Varelas, N; Varnes, E W; Vartapetian, A H; Vasilyev, I A; Vaupel, M; Vaz, M; Verdier, P; Vertogradov, L S; Verzocchi, M; Vigneault, M; Villeneuve-Séguier, F; Vishwanath, P R; Vlimant, J R; Von Törne, E; Vorobyov, A; Vreeswijk, M; Vu-Anh, T; Vysotsky, V S; Wahl, H D; Walker, R; Wallace, N; Wang, L; Wang, Z M; Warchol, J; Warsinsky, M; Watts, G; Wayne, M; Weber, M; Weerts, H; Wegner, M; Wermes, N; Wetstein, M; White, A; White, V; Whiteson, D; Wicke, D; Wijnen, T A M; Wijngaarden, D A; Wilcer, N; Willutzki, H; Wilson, G W; Wimpenny, S J; Wittlin, J; Wlodek, T; Wobisch, M; Womersley, J; Wood, D R; Wyatt, T R; Wu, Z; Xie, Y; Xu, Q; Xuan, N; Yacoob, S; Yamada, R; Yan, M; Yarema, R J; Yasuda, T; Yatsunenko, Y A; Yen, Y; Yip, K; Yoo, H D; Yoffe, F; Youn, S W; Yu, J; Yurkewicz, A; Zabi, A; Zanabria, M; Zatserklyaniy, A; Zdrazil, M; Zeitnitz, C; Zhang, B; Zhang, D; Zhang, X; Zhao, T; Zhao, Z; Zheng, H; Zhou, B; Zhu, J; Zielinski, M; Zieminska, D; Zieminski, A; Zitoun, R; Zmuda, T; Zutshi, V; Zviagintsev, S; Zverev, E G; Zylberstejn, A

    2005-01-01

    The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

  8. CMS upgrade and future plans

    Directory of Open Access Journals (Sweden)

    Hoepfner Kerstin

    2015-01-01

    Full Text Available CMS plans for operation at the LHC phase-II unprecedented in terms of luminosity thus resulting in serious consequences for detector performance. To achieve the goal to maintain the present excellent performance of the CMS detector, several upgrades are necessary. To handle the high phase-II data rates, the readout and trigger systems are redesigned using recent technology developments. The high particle rates will accelerate detector aging and require replacement of the tracker and forward calorimeters. In addition, the muon system will be extended.

  9. The Upgraded D0 detector

    Energy Technology Data Exchange (ETDEWEB)

    Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; /Buenos Aires U. /Rio de Janeiro, CBPF /Sao Paulo, IFT /Alberta U.

    2005-07-01

    The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

  10. Upgrading existing evaporators to reduce energy consumption

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    This manual is intended to assist the evaporator engineer who will be performing the technical and economic analyses to determine the most suitable evaporator upgrading technique for his particular plant. Information is included on potentials for upgrading evaporators; correctable operating factors; heat recovery and other improvements in energy use with minor capital investments; upgrading through major capital investments; guidelines for formulating an upgrading program; and new technologies encompassing advanced designs, use of solar and low-grade heat sources, and heat transfer enhancement. A 36 item bibliography is included. (LCL)

  11. A VLBA Upgrade Conforming to VSOP-2 Specifications

    Science.gov (United States)

    Romney, J. D.

    2009-08-01

    The VLBA was a major participant in the original VSOP mission. NRAO hopes to play a similar role in the VSOP-2 mission, if commensurate support can be obtained for VLBA operations in such a collaboration. While the VLBA's original data system is not compatible with the planned VSOP-2 specifications, the current VLBA Sensitivity Upgrade project will produce a new system that is well-matched to VSOP-2. This upgrade involves replacement of the entire data path downstream from the IFs, and includes a digital sub-band processor, a wideband recording system, and a software correlator. The project's goal is to achieve sustained 4-Gbps operation by 2011, with wideband operation available much earlier for the most scientifically compelling observations. These goals appear to be well matched to the VSOP-2 timeline. This paper presents an overview of the new systems under development, and compares the capabilities of each to the requirements for VSOP-2. Further topics include adaptation of the entire system, and the correlator in particular, to Space VLBI operations, and upgrade aspects that should minimize the data-format incompatibilities that were a substantial difficulty in the first VSOP mission.

  12. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A. [IVO Power Engineering Ltd., Vantaa (Finland)

    1997-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  13. ALICE upgrades its powerful eyes

    CERN Multimedia

    Yuri Kharlov, ALICE Collaboration

    2013-01-01

    The ALICE Photon Spectrometer (PHOS) is a high-resolution photon detector that measures the photons coming out of the extremely hot plasma created in the lead-lead collisions at the LHC. Taking advantage of the long accelerator shut-down, the ALICE teams are now repairing and upgrading the existing modules and getting ready to install the brand-new module in time for the next run. The upgraded PHOS detector will be faster and more stable with wider acceptance and improved photon identification.   PHOS crystal matrix during repair. The key feature and the main complexity of the ALICE PHOS detector is that it operates at a temperature of -25°C, which makes it the second-coldest equipment element at the LHC after the cryogenic superconducting magnets. Since 2009 when it was installed, the PHOS detector, with its cold and warm volumes, has been immersed in airtight boxes to avoid condensation in the cold volumes. The 10,752 lead tungstate crystals of the PHOS were completely insulated fr...

  14. ALICE Upgrades: Plans and Potentials

    CERN Document Server

    Tieulent, Raphael

    2015-01-01

    The ALICE collaboration consolidated and completed the installation of current detectors during LS1 with the aim to accumulate 1 nb$^{-1}$ of Pb-Pb collisions during Run 2 corresponding to about 10 times the Run 1 integrated luminosity. In parallel, the ALICE experiment has a rich detector upgrade programme scheduled during the second LHC long shutdown (LS2, 2018-2019) in order to fully exploit the LHC Runs 3 and 4. The main objectives of this programme are: improving the tracking precision and enabling the read-out of all Pb-Pb interactions at a rate of up to 50 kHz, with the goal to record an integrated luminosity of 10 nb$^{-1}$ after LS2 in minimum-bias trigger mode. This sample would represent an increase by a factor of one hundred with respect to the minimum-bias sample expected during Run 2. The implementation of this upgrade programme, foreseen in LS2, includes: a new low-material Inner Tracking System at central rapidity with a forward rapidity extension to add vertexing capabilities to the current M...

  15. Muon Physics at Run-I and its upgrade plan

    Directory of Open Access Journals (Sweden)

    Benekos Nektarios Chr.

    2015-01-01

    Full Text Available The Large Hadron Collider (LHC and its multi-purpose Detector, ATLAS, has been operated successfully at record centre-of-mass energies of 7 and TeV. After this successful LHC Run-1, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the data set from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2030. To cope with the corresponding rate increase, the ATLAS detector needs to be upgraded. The upgrade will proceed in two steps: Phase I in the LHC shutdown 2018/19 and Phase II in 2023-25. The largest of the ATLAS Phase-1 upgrades concerns the replacement of the first muon station of the highrapidity region, the so called New Small Wheel. This configuration copes with the highest rates expected in Phase II and considerably enhances the performance of the forward muon system by adding triggering functionality to the first muon station. Prospects for the ongoing and future data taking are presented. This article presents the main muon physics results from LHC Run-1 based on a total luminosity of 30 fb^-1. Prospects for the ongoing and future data taking are also presented. We will conclude with an update of the status of the project and the steps towards a complete operational system, ready to be installed in ATLAS in 2018/19.

  16. ATLAS Phase-II trigger upgrade

    CERN Document Server

    Sankey, Dave; The ATLAS collaboration

    2016-01-01

    This talk for ACES summarises the current status of the ATLAS Phase-II trigger upgrade, describing and comparing the two architectures under consideration, namely the two hardware level system described in the Phase-II Upgrade Scoping Document and the more recent single hardware level system.

  17. How Can China Achieve Industrial Upgrade?

    Institute of Scientific and Technical Information of China (English)

    汪建成; 毛蕴诗

    2008-01-01

    Traditional OEM enterprises are facing increasing upgrading pressure due to tighten export environment. This paper carries out a comparative case study on two bathroom hardware manufacturers,by analyzing enterprises upgrading process from OEM to ODM and OBM,this article will be a good reference for other Chinese OEM manufacturers who pursue an independent road of innovation.

  18. Alberta oil sands crudes : upgrading and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Ashar, M. [Suncor Energy, Fort McMurray, AB (Canada)

    2008-05-15

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs.

  19. FTU bolometer electronic system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Pollastrone, Fabio, E-mail: fabio.pollastrone@enea.it [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy); Neri, Carlo; Florean, Marco; Ciccone, Giovanni [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy)

    2013-10-15

    Highlights: ► Design and realization of a new bolometer electronic system. ► Many improvements over the actual commercial system. ► Architecture based on digital electronic hardware with minimal analog front end. ► Auto off-set correction, real time visualization features and small system size. ► Test results for the electronic system. -- Abstract: The FTU (Frascati Tokamak Upgrade) requires a bolometer diagnostic in order to measure the total plasma radiation. The current diagnostic architecture is based on a full analog multichannel AC bolometer system, which uses a carrier frequency amplifier with a synchronous demodulation. Taking into account the technological upgrades in the field of electronics, it was decided to realize an upgrade for the bolometric electronic system by using a hybrid analog/digital implementation. The new system developed at the ENEA Frascati laboratories has many improvements, and mainly a massive system volume reduction, a good measurement linearity and a simplified use. The new hardware system consists of two subsystems: the Bolometer Digital Control and the Bolometer Analog System. The Bolometer Digital Control can control 16 bolometer bridges through the Bolometer Analog System. The Bolometer Digital Control, based on the FPGA architecture, is connected via Ethernet with a PC; therefore, it can receive commands settings from the PC and send the stream of bolometric measurements in real time to the PC. In order to solve the cross-talk between the bridges and the cables, each of the four bridges in the bolometer head receives a different synthesized excitation frequency. Since the system is fully controlled by a PC GUI (Graphic User Interface), it is very user friendly. Moreover, some useful features have been developed, such as: auto off-set correction, bridge amplitude regulation, software gain setting, real time visualization, frequency excitation selection and noise spectrum analyzer embedded function. In this paper, the

  20. Upgradable Software Product Customization by Code Query

    DEFF Research Database (Denmark)

    Vaucouleur, Sebastien

    of a subset of software systems that we call software products: software that needs special support for customization. Through customization, external companies can modify part of the original product to better t the needs of a niche market. Upon the release of a new version of the original software product......, external companies must port their customizations to the latest version of the base software product, a process called an upgrade. Companies typically consider upgrades as mandatory, and hence must bear their high cost on a regular basis. The objectives of customizability and upgradability are conicting...... this constitutes the upgrade problem. We study the upgrade problem in the eld of enterprise systems from a technical point of view, and consider the large spectrum of existing software engineering techniques for customization. We ground our work in an empirical study, that shows that customizations cannot...

  1. LHCb Upgrade: Scintillating Fibre Tracker

    Science.gov (United States)

    Tobin, Mark

    2016-07-01

    The LHCb detector will be upgraded during the Long Shutdown 2 (LS2) of the LHC in order to cope with higher instantaneous luminosities and to read out the data at 40 MHz using a trigger-less read-out system. All front-end electronics will be replaced and several sub-detectors must be redesigned to cope with higher occupancy. The current tracking detectors downstream of the LHCb dipole magnet will be replaced by the Scintillating Fibre (SciFi) Tracker. The SciFi Tracker will use scintillating fibres read out by Silicon Photomultipliers (SiPMs). State-of-the-art multi-channel SiPM arrays are being developed to read out the fibres and a custom ASIC will be used to digitise the signals from the SiPMs. The evolution of the design since the Technical Design Report in 2014 and the latest R & D results are presented.

  2. LHCb Upgrade: Scintillating Fibre Tracker

    Energy Technology Data Exchange (ETDEWEB)

    Tobin, Mark, E-mail: Mark.Tobin@epfl.ch

    2016-07-11

    The LHCb detector will be upgraded during the Long Shutdown 2 (LS2) of the LHC in order to cope with higher instantaneous luminosities and to read out the data at 40 MHz using a trigger-less read-out system. All front-end electronics will be replaced and several sub-detectors must be redesigned to cope with higher occupancy. The current tracking detectors downstream of the LHCb dipole magnet will be replaced by the Scintillating Fibre (SciFi) Tracker. The SciFi Tracker will use scintillating fibres read out by Silicon Photomultipliers (SiPMs). State-of-the-art multi-channel SiPM arrays are being developed to read out the fibres and a custom ASIC will be used to digitise the signals from the SiPMs. The evolution of the design since the Technical Design Report in 2014 and the latest R & D results are presented.

  3. Biological upgrading of coal liquids

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    Culture screening and performance studies were performed with a variety of cultures in removing nitrogen compounds from coal liquid. Two cultures were shown to be effective in removing 17 and 26 percent of the nitrogen in coal liquid as determined by elemental analysis. Experiments will continue in an effort to find additional cultures and isolates able to degrade nitrogen, as well as oxygen and sulfur as heteroatom compounds, from coal liquids. A biological process for upgrading of coal liquids would offer significant advantages, such as operation at ordinary temperature and pressure with better energy efficiency. Of greater importance is the fact that microorganisms do not require an external supply of hydrogen for heteroatom removal, obtaining required hydrogen from water. Furthermore, the biocatalysts are continuously regenerated by growth on the heteroatom compounds. Ring structures are degraded as the heteroatoms are removed. The heteroatoms are in an inocuous form, such as NH[sub 3], SO[sub 4][sup 2[minus

  4. ATLAS Nightly Build System Upgrade

    CERN Document Server

    Dimitrov, G; The ATLAS collaboration; Simmons, B; Undrus, A

    2014-01-01

    The ATLAS Nightly Build System is a facility for automatic production of software releases. Being the major component of ATLAS software infrastructure, it supports more than 50 multi-platform branches of nightly releases and provides ample opportunities for testing new packages, for verifying patches to existing software, and for migrating to new platforms and compilers. The Nightly System testing framework runs several hundred integration tests of different granularity and purpose. The nightly releases are distributed and validated, and some are transformed into stable releases used for data processing worldwide. The first LHC long shutdown (2013-2015) activities will elicit increased load on the Nightly System as additional releases and builds are needed to exploit new programming techniques, languages, and profiling tools. This paper describes the plan of the ATLAS Nightly Build System Long Shutdown upgrade. It brings modern database and web technologies into the Nightly System, improves monitoring of nigh...

  5. ATLAS Nightly Build System Upgrade

    CERN Document Server

    Dimitrov, G; The ATLAS collaboration; Simmons, B; Undrus, A

    2013-01-01

    The ATLAS Nightly Build System is a facility for automatic production of software releases. Being the major component of ATLAS software infrastructure, it supports more than 50 multi-platform branches of nightly releases and provides ample opportunities for testing new packages, for verifying patches to existing software, and for migrating to new platforms and compilers. The Nightly System testing framework runs several hundred integration tests of different granularity and purpose. The nightly releases are distributed and validated, and some are transformed into stable releases used for data processing worldwide. The first LHC long shutdown (2013-2015) activities will elicit increased load on the Nightly System as additional releases and builds are needed to exploit new programming techniques, languages, and profiling tools. This paper describes the plan of the ATLAS Nightly Build System Long Shutdown upgrade. It brings modern database and web technologies into the Nightly System, improves monitoring of nigh...

  6. Beam intensity upgrade at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Marchionni, A.; /Fermilab

    2006-07-01

    The performance of the Fermilab proton accelerator complex is reviewed. The coming into operation of the NuMI neutrino line and the implementation of slip-stacking to increase the anti-proton production rate has pushed the total beam intensity in the Main Injector up to {approx} 3 x 10{sup 13} protons/pulse. A maximum beam power of 270 kW has been delivered on the NuMI target during the first year of operation. A plan is in place to increase it to 350 kW, in parallel with the operation of the Collider program. As more machines of the Fermilab complex become available with the termination of the Collider operation, a set of upgrades are being planned to reach first 700 kW and then 1.2 MW by reducing the Main Injector cycle time and by implementing proton stacking.

  7. Upgrade of CERN OP Webtools IRRAD Page

    CERN Document Server

    Vik, Magnus Bjerke

    2017-01-01

    CERN Beams Department maintains a website with various tools for the Operations Group, with one of them being specific for the Proton Irradiation Facility (IRRAD). The IRRAD team use the tool to follow up and optimize the operation of the facility. The original version of the tool was difficult to maintain and adding new features to the page was challenging. Thus this summer student project is aimed to upgrade the web page by rewriting the web page with maintainability and flexibility in mind. The new application uses a server--client architecture with a REST API on the back end which is used by the front end to request data for visualization. PHP is used on the back end to implement the API's and Swagger is used to document them. Vue, Semantic UI, Webpack, Node and ECMAScript 5 is used on the fronted to visualize and administrate the data. The result is a new IRRAD operations web application with extended functionality, improved structure and an improved user interface. It includes a new Status Panel page th...

  8. Lebedev Physical Institute Racetrack Microtron Upgrade

    CERN Document Server

    Kurakin, V G; Busygin, V P; Koltsov, A V; Kurakin, P V

    2004-01-01

    Lebedev Physical Institute racetrack microtron is in use since the mid of eightieth of the last century. Currently it serves as free electron laser driver at the Lebedev Physical Institute Radiation Complex. Flexibility of the design and high pulse intensity of accelerated beam are the features of this machine. The experience that had been acquired during long period of accelerator use has brought us to decision to upgrade the machine in order to bring it to modest level of operation with precise beam parameters and prepare it for new tasks as well. New configuration assembling will be combined with non steady beam dynamics exploration. The latter assumes also high current instabilities study, first of all beam intensity auto modulation. The project includes two stages. The final one assumes electron beam energy increase up to the level of 50 MeV, and this requires three additional orbits assembling. We plan to replace existing monitoring and control system with modern computer based system, and together with...

  9. ATLAS Upgrades for the next Decades

    CERN Document Server

    Volpi, Guido; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is ramped up and successfully took data at the center-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Along with maintenance and consolidation of the detector in the past few years, ATLAS has added inner b-layer to its tracking system. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requir...

  10. Upgrades to the Polarized Neutron Reflectometer Asterix at LANSCE

    Energy Technology Data Exchange (ETDEWEB)

    Pynn, Roger

    2015-03-16

    We have upgraded the polarized neutron reflectometer, Asterix, at the Lujan Neutron Scattering Center at Los Alamos for the benefit of the research communities that study magnetic and complex-fluid films, both of which play important roles in support of the DOE’s energy mission. The upgrades to the instrument include: • A secondary spectrometer that was integrated with a Huber sample goniometer purchased with other funds just prior to the start of our project. The secondary spectrometer provides a flexible length for the scattered flight path, includes a mechanism to select among 3 alternative polarization analyzers as well as a support for new neutron detectors. Also included is an optic rail for reproducible positioning of components for Spin Echo Scattering Angle Measurement (SESAME). The entire secondary spectrometer is now non-magnetic, as required for neutron Larmor labeling. • A broad-band neutron polarizer for the incident neutron beam based on the V geometry. • A wide-angle neutron polarization analyzer • A 2d position-sensitive neutron detector • Electromagnetic coils (Wollaston prisms) for SESAME plus the associated power supplies, cooling, safety systems and integration into the data acquisition system. The upgrades allowed a nearly effortless transition between configurations required to serve the polarized neutron reflectometry community, users of the 11 T cryomagnet and users of SESAME.

  11. Harmonic sextupoles for the Advanced Light Source low emittance upgrade

    Science.gov (United States)

    Madur, A.; Arbelaez, D.; Marks, S.; Prestemon, S.; Robin, D.; Schlueter, R.; Steier, C.; Wan, W.

    2011-09-01

    The Advanced Light Source is a 3rd generation light source in operation since 1993. This light source is providing state of the art performance to more than 40 beamlines and their users thanks to the upgrades that have been completed over the last few years. Higher photon beam brightness is expected to become available to users in the near future through a new upgrade with the introduction of 48 sextupoles in the ALS lattice. Introducing new combined function magnets in an existing storage ring is a challenge due to the limited space available and a balance had to be found between magnet performance and spatial constraints. Moreover, the existing steering magnets will be replaced by the harmonic sextupoles. Therefore predicting the hysteresis behavior of the harmonic sextupole steering functions became critical for those included in the fast-orbit feedback loop (22 of them). After a brief introduction to the motivation for the upgrade and the scope of the project, we develop in this paper the different constraints driving the three required combined function magnet designs as well as their expected performance.

  12. Diagnostic Systems Plan for the Advanced Light Source Top-OffUpgrade

    Energy Technology Data Exchange (ETDEWEB)

    Barry, Walter; Chin, Mike; Robin, David; Sannibale, Fernando; Scarvie, Tom; Steier, Christoph

    2005-05-10

    The Advanced Light Source (ALS) will soon be upgraded to enable top-off operations [1], in which electrons are quasi-continuously injected to produce constant stored beam current. The upgrade is structured in two phases. First, we will upgrade our injector from 1.5 GeV to 1.9 GeV to allow full energy injection and will start top-off operations. In the second phase, we will upgrade the Booster Ring (BR) with a bunch cleaning system to allow high bunch purity top-off injection. A diagnostics upgrade will be crucial for success in both phases of the top-off project, and our plan for it is described in this paper. New booster ring diagnostics will include updated beam position monitor (BPM) electronics, a tune monitoring system, and a new scraper. Two new synchrotron light monitors and a beam stop will be added to the booster-to-storage ring transfer line (BTS), and all the existing beam current monitors along the accelerator chain will be integrated into a single injection efficiency monitoring application. A dedicated bunch purity monitor will be installed in the storage ring (SR). Together, these diagnostic upgrades will enable smooth commissioning of the full energy injector and a quick transition to high quality top-off operation at the ALS.

  13. Evolution of informal settlements upgrading strategies in Egypt: From negligence to participatory development

    Directory of Open Access Journals (Sweden)

    Marwa A. Khalifa

    2015-12-01

    Full Text Available The issue of informal settlements represents a key challenge not only in Egypt, but also worldwide. A review of informal settlements upgrading policies shows that governments have moved away from eradication policies to provision, enabling and participatory policies. This shift was motivated by the recognition that informal settlements were not a problem but a solution stimulated by the society when the formal housing markets cannot fulfill its demand. In Egypt, despite all efforts to contain the growth of informal settlements, they are steadily growing. This paper aims at mapping the change of informal settlements upgrading strategies in Egypt starting from negligence to contemporary participatory development approaches and housing policies aimed at providing affordable shelter to the urban poor. Additionally, it examines some best practices of informal settlements upgrading projects to find out the influential driving forces affecting the success of these projects that are suitable for scaling up and replication.

  14. Upgrading messaging system on faculty systems

    OpenAIRE

    Farkaš, Aleš

    2014-01-01

    The graduation thesis provides a solution for the transition a part of mail servers of University of Ljubljana. The transition was carried out from the Microsoft Exchange Server 2003 to Microsoft Exchange Server 2010. Next to upgrade of messaging system, the upgrade of the Active Directory carriers has been needed. For this purpose the upgrade to Windows Server 2008 R2 has been performed. In the first part of the work, the overview of the process of the MS Exchange server and Outlook clie...

  15. LHCb Upgraded RICH 2 Engineering Design Review Report

    CERN Document Server

    Garsed, Philip John; Cardinale, Roberta; Petrolini, Alessandro; Benettoni, Massimo; Simi, Gabriele; Zago, M; Easo, Sajan; D'Ambrosio, Carmelo; Frei, Christoph; He, Jibo; Piedigrossi, Didier

    2016-01-01

    During the Long Shutdown 2 of the LHC, the LHCb experiment and, specifically, its two Ring Imaging Cherenkov (RICH) detectors will undergo a major upgrade. RICH 2 will be refurbished with new photon detectors and their associated electronics, with the capability of up to 40 MHz sustained acquisition rate. A new support and cooling system has been developed for the two photodetector arrays, retaining the vessel, gas and optical systems unchanged. This document describes their new mechanical arrangement, its engineering design, installation and alignment. A summary of the project schedule and Institute responsibilities is provided.

  16. Technology research and development, and project finding of alternative energies. Part 3. Up-grading technology of middle and low class coal; Sekiyu daitai energy shigen ni kakawaru gijutsu kaihatsu to project finding. 3. Chutei hin`itan katsuyo no tame no kaishitsu gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    Takemoto, K.

    1994-09-05

    The up-grading technology of middle and low class coal is outlined reviewing its future. The up-grading process composed of a main fluidized-bed drying furnace removes water content from coal by heating rapidly at more than 300{degree}C, and transforms decomposed carboxyl group and phenolic hydroxyl group into hydrophobic ether group. It also prevents coal from reabsorption of water by hydrophobic coal surface covered with generated tar, and from spontaneous ignition through deactivation of coal by removing lower volatile oils. The fundamental design data for commercial plants were obtained by fabricating a mini-pilot plant of 1 t/h. The production cost of the up-graded coal was estimated to be 16.7 $/t in 1986, and as the result of a feasibility study, such a cost was reasonable enough in specific consuming regions even if a transportation cost was added. However, construction of the demonstration plant whose fundamental design was completed in 1989 remains stopping unfortunately today because of a sluggish coal market. 11 refs., 1 fig., 2 tabs.

  17. Upgrades to MINERVA control software

    Science.gov (United States)

    Wilson, Maurice; Eastman, Jason D.

    2017-01-01

    The MINiature Exoplanet Radial Velocity Array (MINERVA) is an array of four robotic telescopes located on Mt. Hopkins in Arizona that will find and characterize rocky planets around our nearest stars. We discuss the latest upgrades to the MINERVA robotic control software. Previously, our robotic control software was only capable of taking radial velocities or photometry for the entire night, but not both. We have recently increased the speed and ease of transitioning between photometry and radial velocity (RV) observations. We can now arbitrarily assign a subset of the telescopes to either photometric or spectroscopic observations. This capability enables us to monitor stellar activity while measuring the star’s RV, gather photometry on one star while continuing our RV survey of other targets and provide education and public outreach opportunities where others can observe with one or more telescopes while we continue using the remaining telescopes for research. This material is based upon work supported by the National Science Foundation Graduate Research Fellowship Program under Grant No. 1144152.

  18. Upgrade of the CMS Tracker

    CERN Document Server

    Klein, Katja

    2013-01-01

    The performance of the Tracker of the CMS experiment, comprising of a pixel and a strip detector, has so far been excellent, as reflected in the wealth of beautiful physics results from CMS. However, the foreseen increases of both the instantaneous and the integrated luminosity by the LHC during the next ten years will necessitate a stepwise upgrade of the CMS tracking detector. \\\\ In the extended end-of-year shutdown 2016/17 the pixel detector will be exchanged. The new device is designed for an instantaneous luminosity of $2\\cdot 10^{34}$\\,cm$^{-2}$s$^{-1}$ and an integrated luminosity of 500\\,fb$^{-1}$. The number of layers will be increased from three to four in the barrel part and from two to three in the end caps, thus providing four-hit coverage over the full pseudorapidity range. A smaller beampipe allows the reduction of the radius of the innermost layer, improving the tracking performance. Further improvements include a new readout chip, reduction of material, and the installation of more effi...

  19. The upgrade of the LHCb Vertex Locator

    CERN Document Server

    Bird, T

    2014-01-01

    The LHCb experiment is set for a significant upgrade, which will be ready for Run~3 of the LHC in 2020. This upgrade will allow LHCb to run at a significantly higher instantaneous luminosity and collect an integrated luminosity of $50\\,\\text{fb}^{-1}$ by the end of Run~4. In this process the Vertex locator (VELO) detector will be upgraded to a pixel-based silicon detector. The upgraded VELO will improve upon the current detector by being closer to the beam and having lower material modules with microchannel cooling and a thinner RF-foil. Simulations have shown that it will maintain its excellent performance, even after the radiation damage caused by collecting an integrated luminosity of $50\\,\\text{fb}^{-1}$.

  20. System and process for upgrading hydrocarbons

    Energy Technology Data Exchange (ETDEWEB)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  1. Physics benchmarks of the VELO upgrade

    CERN Document Server

    Eklund, Lars

    2017-01-01

    The LHCb Experiment at the LHC is successfully performing precision measurements primarily in the area of flavour physics. The collaboration is preparing an upgrade that will start taking data in 2021 with a trigger-less readout at five times the current luminosity. The vertex locator has been crucial in the success of the experiment and will continue to be so for the upgrade. It will be replaced by a hybrid pixel detector and this paper discusses the performance benchmarks of the upgraded detector. Despite the challenging experimental environment, the vertex locator will maintain or improve upon its benchmark figures compared to the current detector. Finally the long term plans for LHCb, beyond those of the upgrade currently in preparation, are discussed.

  2. Technology to Upgrade Magneto-Materials

    Institute of Scientific and Technical Information of China (English)

    2003-01-01

    @@ CAS scientists have developed a new surface-coating technology to upgrade the product quality of China's permanent magnet materials. The success is appraised by an evaluation penal of the CAS Shenyang Branch in northeastern China' s Liaoning Province.

  3. Readout scheme of the upgraded ALICE TPC

    CERN Document Server

    Appelshaeuser, Harald; Ivanov, Marian; Lippmann, Christian; Wiechula, Jens

    2016-01-01

    In this document, we present the updated readout scheme for the ALICE TPC Upgrade. Two major design changes are implemented with respect to the concept that was presented in the TPC Upgrade Technical Design Report: – The SAMPA front-end ASIC will be used in direct readout mode. – The ADC sampling frequency will be reduced from 10 to 5 MHz. The main results from simulations and a description of the new readout scheme is outlined.

  4. Lower Hybrid System upgrade on Tore Supra

    Science.gov (United States)

    Beaumont, B.; Beunas, A.; Bibet, P.; Kazarian, F.

    2003-12-01

    An upgrade of the heating systems is in progress on Tore Supra. It is focused on the manufacturing of a new coupler, using the PAM concept as foreseen for ITER launcher, and the upgrade of the existing transmitter by replacing the 16 existing 500 kW, 210 s klystrons with new 750 kW, 1000s klystrons. Main features of the launcher and klystron are presented.

  5. Neue Anwendungsgebiete der Elektronzyklotronresonanzheizung an ASDEX Upgrade

    OpenAIRE

    Höhnle, Hendrik

    2012-01-01

    In dieser Arbeit wurden Heizszenarien der Elektronzyklotronresonanzheizung (ECRH) für neue Parametergebiete am Tokamak ASDEX Upgrade im Hinblick auf ITER entwickelt. Die ECRH wird seit dem Umbau des Materials der ersten Wand von Kohlenstoff zu Wolfram auch für die Kontrolle der Wolframkonzentration im Plasmazentrum gebraucht. In ITER-relevanten Entladungen an ASDEX Upgrade wird der Einsatz der ECRH in der üblich verwendeten außerordentlichen Mode an der zweiten Harmonischen (X2-Mode) jedoch b...

  6. Upgrades of the ATLAS trigger system

    CERN Document Server

    Pastore, Francesca; The ATLAS collaboration

    2017-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. \\\\ By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions ...

  7. The ALICE Inner Tracking System Upgrade

    CERN Document Server

    Siddhanta, Sabyasachi

    2015-01-01

    The long term plan of ALICE (A Large Ion Collider Experiment) at the CERN Large Hadron Collider (LHC) is a detailed investigation and characterisation of the Quark-Gluon Plasma (QGP). ALICE has devised a comprehensive upgrade strategy to enhance its physics capabilities and to exploit the LHC running conditions after the second long shutdown of the LHC scheduled in 2019-20. The upgraded ALICE will focus on high precision measurements of rare probes over a wide range of momenta, which will significantly improve the performance with respect to the present experimental set up. The upgrade strategy is based on the fact that after LS2 LHC will progressively increase its luminosity with Pb beams eventually reaching an interaction rate of about 50 kHz. To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for...

  8. Soft ware upgrade for Mobile Laboratories in Estonia, Latvia and Lithuania

    DEFF Research Database (Denmark)

    Bargholz, Kim; Andersen, Frank

    1998-01-01

    In July-August 1998 the soft ware for controlling the measurements in the mobile laboratories have been upgraded. The mobile laboratories are sponsored by Danish east aid projects in cooperation with Rotaray Denmark.The equipment used is 4 L NaI(Tl) detectors mounted on the roof of the cars...

  9. Quality Control of CMS - GE1/1 Muon Detector Upgrade

    CERN Document Server

    Salem, Safaa

    2016-01-01

    This report summarizes the project I get assigned to as a CERN summer student from 27th of June 2016 to 19th of August 2016. It is mainly focused on Quality Control of CMS GE1/1 muon detector upgrade.

  10. Does the Use of Cuisenaire Rods in Kindergarten, First and Second Grades Upgrade Arithmetic Achievement?

    Science.gov (United States)

    Dairy, Lorna

    This study is the final report of a three year project to find out if the use of Cuisenaire rods in kindergarten, first, and second grades upgrades arithmetic achievement. Both experimental and control schools enrolled children with average ability who came from lower middle class homes. Children in the experimental kindergarten classes were…

  11. Success for Learning Disabled Students. Sources to Upgrade Career Counseling and Employment of Special Students.

    Science.gov (United States)

    Lombana, Judy H.

    As one of the publications of the Florida Sources to Upgrade the Career Counseling and Employment of Special Students (SUCCESS) Project, this guide is designed to provide school counselors, occupational specialists, and other guidance personnel with basic information and listings of resources concerning the career guidance needs of handicapped…

  12. Boosting Bandwidth: Colleges Are Upgrading Their Network Infrastructure to Support Next-Generation Technologies

    Science.gov (United States)

    Wong, Wylie

    2014-01-01

    In October 2013, nearly half of U.S. community colleges--46.2 percent-- said upgrading their campus networks is a "very important priority" within the next three years, according to The Campus Computing Project, a survey of 94 community colleges. More robust networks are needed to support a host of new wireless access points and the…

  13. Taking Forestry Upgrading Form College Student to University Student in Applicaion of Project Teaching Method in Correspondence Teaching%函授教学中项目教学法的应用--以林学专升本为例

    Institute of Scientific and Technical Information of China (English)

    阮淑明

    2014-01-01

    Traditional teaching method in forestry correspondence is the teachers' teaching and student’s passive listening to, which proves bad effect. Project teaching method is based on the characteristics of adult higher education, changing teaching mode, taking students as the main body, the teaching process is that teacher helps and guides project operation process to improve the comprehensive quality of students.%林学函授传统的教学方法就是教师讲授为主,学生被动听课,学习效果不佳。项目教学法是根据成人高等教育的特点,转变教学模式,以学生为主体,课程教学过程就是教师帮助与引导一个个项目的技能操作过程,提高学生的综合素质。

  14. Overview of modelling activities for Plasma Control Upgrade in JET

    Energy Technology Data Exchange (ETDEWEB)

    Albanese, R., E-mail: raffaele.albanese@unina.it [Consorzio CREATE, Euratom-ENEA Association, DIEL, Univ. Napoli Federico II, Via Claudio 21, 80125 Napoli (Italy); JET-EFDA, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); Ambrosino, G.; Ariola, M.; Artaserse, G.; Bellizio, T. [Consorzio CREATE, Euratom-ENEA Association, DIEL, Univ. Napoli Federico II, Via Claudio 21, 80125 Napoli (Italy); JET-EFDA, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); Coccorese, V. [Consorzio CREATE, Euratom-ENEA Association, DIEL, Univ. Napoli Federico II, Via Claudio 21, 80125 Napoli (Italy); EFDA Close Support Unit, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); JET-EFDA, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); Crisanti, F. [ENEA Fus, EURATOM Assoc, 00040 Frascati (Italy); JET-EFDA, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); De Tommasi, G.; Fresa, R. [Consorzio CREATE, Euratom-ENEA Association, DIEL, Univ. Napoli Federico II, Via Claudio 21, 80125 Napoli (Italy); JET-EFDA, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); Lomas, P.J. [CCFE, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); JET-EFDA, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); Mattei, M.; Maviglia, F. [Consorzio CREATE, Euratom-ENEA Association, DIEL, Univ. Napoli Federico II, Via Claudio 21, 80125 Napoli (Italy); JET-EFDA, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); Neto, A. [Associacao Euratom-IST, Instituto de Plasmas e Fusao Nuclear, Av. Rovisco Pais, 1049-001 Lisboa (Portugal); JET-EFDA, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); Piccolo, F. [CCFE, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); JET-EFDA, Culham Science Centre, OX14 3DB Abingdon (United Kingdom); Pironti, A. [Consorzio CREATE, Euratom-ENEA Association, DIEL, Univ. Napoli Federico II, Via Claudio 21, 80125 Napoli (Italy); JET-EFDA, Culham Science Centre, OX14 3DB Abingdon (United Kingdom)

    2011-10-15

    The JET enhancement project Plasma Control Upgrade (PCU) aimed at increasing the capabilities of the plasma vertical stabilization (VS) system. One of the activities of this project was devoted to the development of simple but sufficiently accurate models of the VS system so as to address the main design choices, use the simulation tools as reliable test-beds, and provide an adequate support to the engineering design and commissioning of the new Enhanced Radial Field Amplifier (ERFA). This paper illustrates some of the main achievements of the modelling activity, which gave rise to a closed loop model of the VS system, including plasma, PF coils and passive structures. In particular the paper deals with the selection of the set of turns to be used in the control coils and with the estimation of the eddy current effects on the VS system. The latter analysis addressed an upgrade of the converter units of ERFA, successfully implemented during its commissioning on plasma in August 2009.

  15. Regimes of spatial ordering in Brazil: neoliberalism, leftist populism and modernist aesthetics in slum upgrading in Recife

    NARCIS (Netherlands)

    Nuijten, M.C.M.; Koster, M.; Vries, de P.A.

    2012-01-01

    This paper shows how regimes of spatial ordering in Brazil are produced by the entangling of neoliberalism, leftist populism and modernist visions. The paper focuses on Prometrópole, a slum upgrading project in Recife funded by the World Bank, which commenced in 2007. In this project, the neoliberal

  16. Regimes of spatial ordering in Brazil: neoliberalism, leftist populism and modernist aesthetics in slum upgrading in Recife

    NARCIS (Netherlands)

    Nuijten, M.C.M.; Koster, M.; Vries, de P.A.

    2012-01-01

    This paper shows how regimes of spatial ordering in Brazil are produced by the entangling of neoliberalism, leftist populism and modernist visions. The paper focuses on Prometrópole, a slum upgrading project in Recife funded by the World Bank, which commenced in 2007. In this project, the neoliberal

  17. Canandaigua Wines: Compressed Air System Upgrade Saves Energy and Improves Performance at a Winery

    Energy Technology Data Exchange (ETDEWEB)

    None

    2005-03-01

    In June 2004, Canandaigua Wine Company (CWC) completed an upgrade project on the compressed air system at its winery in Lodi, California. Before the project, the winery depended on two compressors to satisfy its production requirements. Anticipating an expansion of its production capacity, the winery commissioned a review of the compressed air system by a U.S. Department of Energy (DOE) Qualifi ed AIRMaster+ Specialist at Atlas Copco Compressors, Inc.

  18. Overview of ASDEX Upgrade results

    Science.gov (United States)

    A. Kallenbachthe ASDEX Upgrade Team; the EUROfusion MST1 Team

    2017-10-01

    The ASDEX Upgrade (AUG) programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. Since 2015, AUG is equipped with a new pair of 3-strap ICRF antennas, which were designed for a reduction of tungsten release during ICRF operation. As predicted, a factor two reduction on the ICRF-induced W plasma content could be achieved by the reduction of the sheath voltage at the antenna limiters via the compensation of the image currents of the central and side straps in the antenna frame. There are two main operational scenario lines in AUG. Experiments with low collisionality, which comprise current drive, ELM mitigation/suppression and fast ion physics, are mainly done with freshly boronized walls to reduce the tungsten influx at these high edge temperature conditions. Full ELM suppression and non-inductive operation up to a plasma current of {{I}\\text{p}}=0.8 MA could be obtained at low plasma density. Plasma exhaust is studied under conditions of high neutral divertor pressure and separatrix electron density, where a fresh boronization is not required. Substantial progress could be achieved for the understanding of the confinement degradation by strong D puffing and the improvement with nitrogen or carbon seeding. Inward/outward shifts of the electron density profile relative to the temperature profile effect the edge stability via the pressure profile changes and lead to improved/decreased pedestal performance. Seeding and D gas puffing are found to effect the core fueling via changes in a region of high density on the high field side (HFSHD). The integration of all above mentioned operational scenarios will be feasible and naturally obtained in a large device where the edge is more opaque for neutrals and higher plasma temperatures provide a lower collisionality. The combination of exhaust control with pellet fueling has been successfully

  19. Upgrading of Gasification Gases by means of a Catalytic Membrane Reactor: WGS Catalysts and Inorganic Palladium Membranes HENRECA Project (ENE2004-07758-CO2-01). Final Report; Estudios de Enriquecimiento en H{sub 2} de Gases de Gasificacion mediante el Uso Reactor Catalitico de Membranas: Catalizadores WGS y Membranas Inorganicas de Paladio. Informe Final Proyecto HENRECA (ENE2004-07758-C02-01)

    Energy Technology Data Exchange (ETDEWEB)

    Maranon Bujan, M.; Sanchez Hervas, J. M.; Barreiro Carou, M. del

    2008-07-01

    The combination of a CO catalytic converter with a highly hydrogen selective membrane out stands as a very promising technology for the upgrading of biomass gasification gases. The advantages of this combined system over the traditional two stages WGS technology has been investigated within the HENRECA project, financed under the Spanish PN 2004-2007 of the Ministry of Science and Technology. This project started in September 2004 and had a duration of three years. The Division of Combustion and Gasification of CIEMAT participates in this project in three main activities: the study of the catalytic activity of WGS catalysts synthesised by the other partner of the project (University Rey Juan Carlos), the design of the reaction-separation system and the design and construction of a bench-scale pilot plant where the performance of the membranes prepared by URJC and the catalytic membrane system were investigated. This report describes the activities carried out within the project and the main results obtained. (Author) 14 ref.

  20. Reducing CO2 emission from bitumen upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, John

    2011-07-15

    The treatment of sand oil can result in significant CO2 emission. Ceramatec Inc. has developed a technology to reduce the emission of CO2 during the upgrading of feedstocks bearing heteroatoms. This technology can be applied to kerogen derived oil (shale oil) and heavy oil as well as to bitumen from oil sands. Metallic sodium is used as the reducing and heteroatom scavenging agent. Hydrogen, methane or other hydrocarbons may be used to cap radicals formed in the process. But using methane can lead to lower material and capital costs, greater product yield, and lower CO2 emission. During the upgrading process, the aromatic constituents remain in the product, after treatment with sodium and removal of sulphur, nitrogen and metals. Aromatic saturation is not required with sodium, so less hydrogen is needed which leads to reduced CO2 emission. The reason is that CO2 is emitted in the steam methane reforming (SMR) process where hydrogen is produced. An example is introduced to demonstrate the reduction of CO2 emission from hydrogen production. Another advantage of the sodium/methane upgrading process is the incorporation of methane into the fuel. In addition, the total acid number, TAN, becomes negligible in the sodium upgrading processes. Ceramatec has also developed a process for the recovery of sodium from the sodium salts generated in the sodium/methane upgrading process.

  1. The sROD Demonstrator for the ATLAS Tile Calorimeter Upgrade

    CERN Document Server

    Carrio, F; The ATLAS collaboration

    2012-01-01

    The Tile Calorimeter (TileCal) program for the phase-2 upgrade of the ATLAS detector at the LHC aims at a complete replacement of the read-out electronics. The new architecture is planned in order to provide digitized information for the first-level trigger with improved precision and detail. The demonstrator project for TileCal phase-2 upgrade consists of the installation of the new system with the upgrade architecture in a small part of the TileCal in order to evaluate its performance. The part of the demonstrator described here, the sROD demonstrator, is an ATCA-based module, designed to process data from 48 channels of this new system. The sROD demonstrator uses pipeline memories with programmable latency and provide level-1 digital trigger signals. It will also be interfaced to the front-end in order to transmit detector and trigger control as well as timing information.

  2. Laser performance upgrade for precise ICF experiment in SG-Ⅲ laser facility

    Directory of Open Access Journals (Sweden)

    Wanguo Zheng

    2017-09-01

    Full Text Available The SG-Ⅲ laser facility (SG-Ⅲ is the largest laser driver for inertial confinement fusion (ICF researches in China, which has 48 beamlines and can deliver 180 kJ ultraviolet laser energy in 3 ns. In order to meet the requirements of precise physics experiments, some new functionalities need to be added to SG-Ⅲ and some intrinsic laser performances need upgrade. So at the end of SG-Ⅲ's engineering construction, the 2-year laser performance upgrade project started. This paper will introduce the newly added functionalities and the latest laser performance of SG-Ⅲ. With these function extensions and performance upgrade, SG-Ⅲ is now fully prepared for precise ICF experiments and solidly paves the way towards fusion ignition.

  3. Design and delivery of beam monitors for the energy-upgraded linac in J-PARC

    Science.gov (United States)

    Miura, Akihiko; Ouchi, Nobuo; Oguri, Hidetomo; Hasegawa, Kazuo; Miyao, Tomoaki; Ikegami, Masanori

    2015-02-01

    In the J-PARC (Japan Proton Accelerator Research Complex) linac, an energy-upgrade project has started to achieve a design beam power of 1 MW at the exit of the downstream synchrotron. To account for the significant beam parameter upgrades, we will use the newly-fabricated beam monitors for the beam commissioning. This paper discusses the design and assembly of the beam position monitor, phase monitor, current monitor, transverse profile monitor, and beam loss monitor for the energy-upgraded linac. We periodically installed the newly-fabricated monitors for the upgraded beam line, as well as for longitudinal matching, because of the frequency jump between the original RF cavity and the newly-developed cavity. We employed two debunchers to correct for momentum spread and jitter. To account for the new debunchers, we fabricated and installed additional pairs of phase monitors in order to tune the debunchers to the adequate RF set point. Finally, we propose commissioning plans to support the beam monitor check. We will begin to establish the 181-MeV operation to confirm the proper functioning of beam monitors. Herein, we will examine the response to changes of the knobs that control the quadrupole magnets after the energy upgrade. After proper functioning of the beam monitors is confirmed, we will use the new beam monitors to establish the 400-MeV acceleration operation.

  4. Tracking triggers for the upgraded DOe detector

    Energy Technology Data Exchange (ETDEWEB)

    Glenn, S. [California Univ., Davis (United States); Bloom, P. [California Univ., Davis (United States); Mani, S. [California Univ., Davis (United States); Pellett, D. [California Univ., Davis (United States); Costa, J. [CBPF/LAFEX, Rio de Janeiro (Brazil); Moreira, L. [CBPF/LAFEX, Rio de Janeiro (Brazil); Baumbaugh, A. [Fermi National Accelerator Laboratory, Batavia, IL (United States); Blazey, G. [Fermi National Accelerator Laboratory, Batavia, IL (United States); Borcherding, F. [Fermi National Accelerator Laboratory, Batavia, IL (United States); Johnson, M. [Fermi National Accelerator Laboratory, Batavia, IL (United States); Wilcox, J. [Northeastern University, Boston, MA (United States)

    1995-06-01

    The high luminosity environment of the upgraded Tevatron will require not only the upgrade of various DOe subdetectors, but the trigger system as well. With respect to the present system, the upgraded trigger system must operate faster and provide a higher degree of background rejection while extending the physics acceptance beyond that of the current system. This will be accomplished in part by incorporating the scintillating fiber tracker and the preshower detector into the Level 1 trigger. Track logic, implemented in commercial FPGAs, will be used to identify tracks in the scintillating fiber tracker with P{sub T}>1.5 GeV/c and electron candidates in the preshower detector. Integration of the trigger logic and readout electronics permits the identification of all tracks in a few hundred nanoseconds. Here, preliminary designs for the readout and trigger electronics are presented along with simulation results for trigger efficiencies and rejection factors. (orig.).

  5. Upgrade of the ALICE Inner Tracking System

    CERN Document Server

    Belikov, Iouri

    2016-01-01

    A Large Ion Collider Experiment (ALICE) is built to study the properties of the strongly interacting matter created in heavy-ion collisions at the LHC. With the upgrade of its Inner Tracking System (ITS), the ALICE experiment is going to increase the rate of data taking by almost two orders of magnitude. At the same time, the precision of secondary vertex reconstruction will become by at least a factor 3 better than it currently is. In this talk, we briefly show some selected physics results motivating the upgrade of the ITS, describe the design goals and the layout of the new detector, and highlight a few important measurements that will be realized after the completion of this upgrade.

  6. Microbial biocatalyst developments to upgrade fossil fuels.

    Science.gov (United States)

    Kilbane, John J

    2006-06-01

    Steady increases in the average sulfur content of petroleum and stricter environmental regulations concerning the sulfur content have promoted studies of bioprocessing to upgrade fossil fuels. Bioprocesses can potentially provide a solution to the need for improved and expanded fuel upgrading worldwide, because bioprocesses for fuel upgrading do not require hydrogen and produce far less carbon dioxide than thermochemical processes. Recent advances have demonstrated that biodesulfurization is capable of removing sulfur from hydrotreated diesel to yield a product with an ultra-low sulfur concentration that meets current environmental regulations. However, the technology has not yet progressed beyond laboratory-scale testing, as more efficient biocatalysts are needed. Genetic studies to obtain improved biocatalysts for the selective removal of sulfur and nitrogen from petroleum provide the focus of current research efforts.

  7. Environmental upgrading of a landfill; Ricomposizione ambientale di una discarica

    Energy Technology Data Exchange (ETDEWEB)

    Agostinetto, V.; Vendrame, G.

    1999-01-01

    This article refers to an experimental study concerning the vegetative upgrading of a closed-down landfill (once used for industrial waste disposal). The aim was to check the possibility of reconstructing or aiding the natural growth of a vegetation in keeping with the surrounding area, in a tried environment such as that of landfills. The original idea contained in the approved project - which meant to generically upgrade the territory by planting species belonging to the grassy layer, shrubs and trees - has, with time, undergone some changes. On the basis of both the knowledge acquired during management and of a more accurate analysis of the territory, the experiment was preferred to aim at finding out which were the species, both continental and Mediterranean, able to gradually adjust to the surrounding landscape, leaving to natural selection the task to decide which species were more suitable to the upgrading of closed-down landfills, and which planting technique was more effective. [Italiano] L`articolo ha per oggetto uno studio sperimentale inerente la ricomposizione vegetativa di una discarica esaurita (un tempo utilizzata per lo smaltimento dei rifiuti industriali), finalizzato a verificare la possibilita` di ricostruire o favorire il naturale insediarsi della vegetazione in sintonia con il territorio circostante in un ambiente provato quale quello di discarica. L`idea originaria contenuta nel progetto approvato che prevedeva una ricomposizione generica mediante l`insediamento di specie relative agli strati erbacei, arbustivi, arborei, si e` nel tempo modificata. Sulla base delle esperienze maturate nella fase gestionale e di una piu` approfondita analisi del contesto territoriale si e` preferito impostare la sperimentazione mirando ad individuare quali fossero le specie sia continentali sia mediterranee in grado di entrare progressivamente in equilibrio con il paesaggio circostante, lasciando alla selezione naturale il compito di decidere quali specie

  8. High temperature ceramic membrane reactors for coal liquid upgrading. Quarterly report No. 12, June 21, 1992--September 20, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-12-31

    In this project we intend to study a novel process concept, i.e.,the use of ceramic membranes reactors in upgrading of coal derived liquids. Membrane reactors have been used in a number of catalytic reaction processes in order to overcome the limitations on conversion imposed by thermodynamic equilibrium. They have, furthermore, the inherent capability for combining reaction and separation in a single step. Thus they offer promise for improving and optimizing yield, selectivity and performance of processes involving complex liquids, as those typically found in coal liquid upgrading. Ceramic membranes are a new class of materials, which have shown promise in a variety of industrial applications. Their mechanical and chemical stability coupled with a wide range of operating temperatures and pressures make them suitable for environments found in coal liquid upgrading. In this project we wig evaluate the performance of Sel-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated.

  9. High temperature ceramic membrane reactors for coal liquid upgrading. Quarter report No. 9, September 21, 1991--December 20, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-07-01

    In this project we intend to study a novel process concept, i.e, the use of ceramic membranes reactors in upgrading of coal derived liquids. Membrane reactors have been used in a number of catalytic reaction processes in order to overcome the limitations on conversion imposed by thermodynamic equilibrium. They have, furthermore, the inherent capability for combining reaction and separation in a single step. Thus they offer promise for improving and optimizing yield, selectivity and performance of processes involving complex liquids, as those typically found in coal liquid upgrading. Ceramic membranes are a new class of materials, which have shown promise in a variety of industrial applications. Their mechanical and chemical stability coupled with a wide range of operating temperatures and pressures make them suitable for environments found in coal liquid upgrading. In this project we will evaluate the performance of Sol-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated.

  10. High temperature ceramic membrane reactors for coal liquid upgrading. Quarterly report No. 2, December 21, 1989--March 20, 1990

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-06-19

    Ceramic membranes are a new class of materials, which have shown promise in a variety of industrial applications. Their mechanical and chemical stability coupled with a wide range of operating temperatures and pressures make them suitable for environments found in coal liquid upgrading. In this project we will evaluate the performance of Sel-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated.

  11. High temperature ceramic membrane reactors for coal liquid upgrading. Quarterly report No. 8, June 21, 1991--September 20, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-06-19

    Ceramic membranes are a new class of materials, which have shown promise in a variety of industrial applications. Their mechanical and chemical stability coupled with a wide range of operating temperatures and pressures make them suitable for environments found in coal liquid upgrading. In this project we will evaluate the performance of Sel-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will also be investigated.

  12. High temperature ceramic membrane reactors for coal liquid upgrading. Quarterly report No. 7, March 21, 1991--June 20, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-06-19

    Ceramic membranes are a new class of materials, which have shown promise in a variety of industrial applications. Their mechanical and chemical stability coupled with a wide range of operating temperatures and pressures make them suitable for environments found in coal liquid upgrading. In this project we will evaluate the performance of Sel-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. In addition, the development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated.

  13. CMS DT Upgrade The Sector Collector Relocation

    CERN Document Server

    Navarro Tobar, Alvaro

    2015-01-01

    The Sector Collector relocation is the first stage of the upgrade program for the Drift Tubes subdetector of the CMS experiment. It was accomplished during Long Shutdown 2013-2014, and consisted in the relocation of the second-level trigger and readout electronics from the experimental to the service cavern, relieving the environmental constraints and improving accessibility for maintenance and upgrade. Extending the electrical links would degrade reliability, so the information is converted to optical with a custom system capable of dealing with the DC-unbalanced data. Initially, present electronics are used, so optical-to-copper conversion has also been installed.

  14. Take control of upgrading to Snow Leopard

    CERN Document Server

    Kissell, Joe

    2009-01-01

    Installing a major new version of Mac OS X should be exciting and fun, but without proper guidance you may find it nerve-wracking or even risk losing valuable files. Fortunately, many thousands of people have upgraded Mac OS X calmly and successfully with Joe Kissell's previous best-selling Take Control of Upgrading... titles. Joe's friendly, expert steps-developed over innumerable test installations-help you to avoid trouble, understand what's going on when you install Snow Leopard, and easily recover from problem

  15. VISIR upgrade overview: all's well that ends well

    Science.gov (United States)

    Kerber, Florian; Käufl, Hans Ulrich; Tristram, Konrad; Asmus, Daniel; Baksai, Pedro; Di Lieto, Nicola; Dobrzycka, Danuta; Duhoux, Philippe; Finger, Gert; Hummel, Christian; Ives, Derek; Jakob, Gerd; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Pantin, Eric; Riquelme, Miguel; Sanchez, Joel; Sandrock, Stefan; Siebenmorgen, Ralf; Stegmeier, Jörg; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Valdes, Guillermo; Venema, Lars

    2016-08-01

    We present an overview of the VISIR instrument after its upgrade and return to science operations. VISIR is the midinfrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan was based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As AQUARIUS detector array manufactured by Raytheon. In addition, a new prism spectroscopic mode covers the whole N-band in a single observation. Finally, new scientific capabilities for high resolution and high-contrast imaging are offered by sub-aperture mask and coronagraphic modes. In order to make optimal use of favourable atmospheric conditions, a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a user-defined constraint on water vapour. During the commissioning in 2012, it was found that the on-sky sensitivity of the AQUARIUS detector was significantly below expectations. Extensive testing of the detector arrays in the laboratory and on-sky enabled us to diagnose the cause for the shortcoming of the detector as excess low frequency noise. It is inherent to the design chosen for this detector and cannot be remedied by changing the detector set-up. Since this is a form of correlated noise, its impact can be limited by modulating the scene recorded by the detector. After careful analysis, we have implemented fast (up to 4 Hz) chopping with field stabilization using the secondary mirror of the VLT. During commissioning, the upgraded VISIR has been confirmed to be more sensitive than the old instrument, and in particular for low-resolution spectroscopy in the N-band, a gain of a factor 6 is realized in observing efficiency

  16. CNES super pressure balloons upgrade for Strateole-2 campaign

    Science.gov (United States)

    Venel, Stephanie; Cocquerez, Philippe; Hertzog, Albert

    2016-07-01

    The French Space Agency, CNES, has developed, since about twelve years ago, super pressure balloons (SPB) that float on constant density (isopycnic) surfaces in the lowermost stratosphere, carrying 40 to 50 kg payloads, during typically three months. These SPB have been successfully deployed in flotilla of about 20 balloons for different scientific campaigns all over the world in different configuration sizes from 8,5 to 12 m diameter, mainly to document the chemistry and dynamics of the atmosphere, to study gravity waves, and to provide in-situ atmospheric profiles thanks to the NCAR driftsonde payload. The SPB housekeeping gondola used from 2005 to 2011 now needs to be upgraded in order to increase the flights' safety and to improve its performance with up to date equipment's. The control center will also be redesigned. These modifications take into account the experience acquired during the last SPB campaigns, mainly during CONCORDIASI, with 19 flights over Antarctica from September 2010 to January 2011. After a successful preliminary design review, the project is now conducting the detailed conception phase. This new system is developed for STRATEOLE-2, a project dedicated to the coupling processes between the troposphere and the stratosphere in the deep tropics, using several types of instruments, both for in situ and remote measurements in the atmosphere. STRATEOLE -2 includes two measurement campaigns, three years spaced to study the quasi biennial oscillation. Since the scientific payloads are fully self-standing, some technical solutions will be common with the CNES housekeeping gondola, such as the renewable power system. This paper will describe the STRATEOLE-2 project and the developments in progress for the SPB system upgrade.

  17. GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING

    Energy Technology Data Exchange (ETDEWEB)

    Howard S. Meyer

    2003-04-01

    Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbing liquid. These resilient membranes provide much greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting in equipment 50-70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. KPS and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project. Efforts this quarter have concentrated on field site selection. ChevronTexaco has nominated their Headlee Gas Plant in Odessa, TX for a commercial-scale dehydration test. Potting and module materials testing were initiated. Preliminary design

  18. A continuous read-out TPC for the ALICE upgrade

    Science.gov (United States)

    Lippmann, C.

    2016-07-01

    The largest gaseous Time Projection Chamber (TPC) in the world, the ALICE TPC, will be upgraded based on Micro Pattern Gas Detector technology during the second long shutdown of the CERN Large Hadron Collider in 2018/19. The upgraded detector will operate continuously without the use of a triggered gating grid. It will thus be able to read all minimum bias Pb-Pb events that the LHC will deliver at the anticipated peak interaction rate of 50 kHz for the high luminosity heavy-ion era. New read-out electronics will send the continuous data stream to a new online farm at rates up to 1 TByte/s. A fractional ion feedback of below 1% is required to keep distortions due to space charge in the TPC drift volume at a tolerable level. The new read-out chambers will consist of quadruple stacks of Gas Electron Multipliers (GEM), combining GEM foils with a different hole pitch. Other key requirements such as energy resolution and operational stability have to be met as well. A careful optimisation of the performance in terms of all these parameters was achieved during an extensive R&D program. A working point well within the design specifications was identified with an ion backflow of 0.63%, a local energy resolution of 11.3% (sigma) and a discharge probability comparable to that of standard triple GEM detectors.

  19. ATLAS Calorimeters: Run-2 performance and Phase-II upgrade

    CERN Document Server

    Boumediene, Djamel Eddine; The ATLAS collaboration

    2017-01-01

    The ATLAS detector was designed and built to study proton-proton collisions produced at the LHC at centre-of-mass energies up to 14 TeV and instantaneous luminosities up to 10^{34} cm^{−2} s^{−1}. A liquid argon (LAr)-lead sampling calorimeter is employed as electromagnetic calorimeter and hadronic calorimter, except in the barrel region, where a scintillator-steel sampling calorimeter (TileCal) is used as hadronic calorimter. This presentation will give first an overview of the detector operation and data quality, as well as the achieved performance of the ATLAS calorimetry system. Additionally, the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC) will be presented. For the HL-LHC, the instantaneous luminosity is expected to increase up to L ≃ 7.5 × 10^{34} cm^{−2} s^{−1} and the average pile-up up to 200 interactions per bunch crossing. The major R&D item is the upgrade of the electronics for both LAr and Tile calorimeters in order to cope wit...

  20. LHCB : The upgraded LHCb RICH detector: status and perspectives

    CERN Multimedia

    Cardinale, Roberta

    2015-01-01

    The LHCb experiment is designed to perform high-precision measurements of CP violation and search for New Physics using the enormous flux of beauty and charmed hadrons produced at the Large Hadron Collider (LHC). The two RICH detectors installed in LHCb have performed successfully during the 2010-2012 data taking period. The data from these detectors were essential to most of the physics results published by LHCb. In order to extend its potential for discovery and study of new phenomena it is planned to upgrade the LHCb experiment in 2018 with a 40MHz readout and a much more flexible software-based triggering system. This would increase the readout rate and occupancies for the RICH detectors. The RICH detector will require new photon detectors and modifications of the optics of the upstream RICH detector. Tests of the complete opto-electronic chain have been performed during testbeam sessions in autumn 2014. The status and perspectives of the RICH upgrade project will be presented.

  1. STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Tiffany Bass, G. Davis, Christiana Wilson, Mircea Stirbet

    2012-07-01

    CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

  2. The Phase II Upgrade of the ATLAS Calorimeter

    CERN Document Server

    Tartarelli, Giuseppe Francesco; The ATLAS collaboration

    2017-01-01

    This presentation will show the status of the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC). For the HL-LHC, the instantaneous luminosity is expected to increase up to L ≃ 7.5 × 1034 cm−2 s−1 and the average pile-up up to 200 interactions per bunch crossing. The Liquid Argon (LAr) calorimeter electronics will need to be replaced to cope with these challenging conditions: the expected radiation doses will indeed exceed the qualification range of the current readout system, and the upgraded trigger system will require much longer data storage in the electronics (up to 60 us), that the current system cannot sustain. The status of the R&D of the low-power ASICs (pre-amplifier, shaper, ADC, serializer and transmitters) and of the readout electronics design will be discussed. Moreover, a High Granularity Timing Detector (HGTD) is proposed to be added in front of the LAr calorimeters in the end-cap region (2.4 <|eta|< 4.2) for pile-up mitigation a...

  3. ATLAS calorimeters: Run-2 performances and Phase-II upgrades

    CERN Document Server

    Boumediene, Djamel Eddine; The ATLAS collaboration

    2017-01-01

    The ATLAS detector was designed and built to study proton-proton collisions produced at the LHC at centre-of-mass energies up to 14 TeV and instantaneous luminosities up to $10^{34} cm^{-2} s^{-1}$. A Liquid Argon-lead sampling (LAr) calorimeter is employed as electromagnetic and hadronic calorimeters, except in the barrel region, where a scintillator-steel sampling calorimeter (TileCal) is used as hadronic calorimeter. This presentation gives first an overview of the detector operation and data quality, as well as of the achieved performances of the ATLAS calorimetry system. Additionally the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC) are presented. For the HL-LHC, the instantaneous luminosity is expected to increase up to $L \\simeq 7.5 × 10^{34} cm^{-2} s^{-1}$ and the average pile-up up to 200 interactions per bunch crossing. The major R&D item is the upgrade of the electronics for both LAr and Tile calorimeters in order to cope with longer latenc...

  4. Studies on BEPC upgrade from pretzel to double-ring

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    Physics opportunity in the charm and τ energy region calls for higher luminosity of the Beijing Electron-Positron Collider (BEPC).The BEPC has experienced continuous improvement since its completion in 1988.BEPCII,as a major upgrading project of the BEPC,aims at enhancing its luminosity of factor 30–100,following the principle of "one machine,two purposes" as adopted in BEPC,so that both high energy physics and synchrotron radiation experiments can be carried out with BEPCII.From the BEPC to BEPCII,the double-ring scheme with multi-bunch e +-e-collision in the large crossing angle was studied in comparison with the single-ring pretzel scheme.For the dedicated synchrotron radiation operation,artful "bridges" are designed to connect two halves of the outer ring in both the southern and the northern crossing regions.This paper reviews the studies on the BEPC upgrade from pretzel to double-ring structure of BEPCII.

  5. Green technologies for the environmental upgrading of infrastructures

    Directory of Open Access Journals (Sweden)

    Alessandra Battisti

    2013-05-01

    Full Text Available Over the last few decades, the globalization phenomenon has determined the exponential development - from an economic, cultural and political standpoint - of traffic flows, the number of means and infrastructures involved in communication and exchange. At the same time, these represent one of the most complicated environmental issues of contemporary times, but perhaps also one of the most outstanding opportunities for setting up processes aimed at upgrading the territory and its constructions, towards environmental regeneration and social reorganization. These, in turn, would produce and spread (as in some already established examples of infrastructure upgrading innovative and more sustainable forms of urban lifestyles. The present contribution aims at illustrating the former, beginning with research and experiments involving the development of eco-friendly meta-design models for the correct employment of “green technologies” in: meta-project research for small mobility facilities; expansion and redevelopment works for the Stazione Termini; experiments in design for some energy-efficient underground metro stops in Rome.

  6. Colorado River Sewer System Joint Venture to Upgrade Wastewater System

    Science.gov (United States)

    SAN FRANCISCO -Today, the Colorado River Sewer System Joint Venture, located in Parker, Ariz. entered into an agreement with the EPA to upgrade their wastewater treatment system to meet stringent water quality standards. The cost of the upgrade is ap

  7. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Lingemann, Joschka; Sakulin, Hannes; Jeitler, Manfred; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run 2 of the Large Hadron Collider pose new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run 1, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new microTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (GMT) which combines information from the muon trigger sub-systems and assigns the isolation variable. The upgraded GMT will be implemented using a Master Processor 7 card, built by Imperial College, that features a large Xilinx Virtex 7 FPGA. Up to 72 optical links at...

  8. Academic Training - LHC luminosity upgrade: detector challenges

    CERN Multimedia

    Françoise Benz

    2006-01-01

    ACADEMIC TRAINING LECTURE SERIES 13, 14, 15, March, from 11:00 to 12:00 - 16 March from 10:00 to 12:00 Main Auditorium, bldg. 500 on 14, 15 March, Council Room on 13, 16 March LHC luminosity upgrade: detector challenges A. De Roeck / CERN-PH, D. Bortoletto / Purdue Univ. USA, R. Wigmans / Texas, Tech Univ. USA, W. Riegler / CERN-PH, W. Smith / Wisconsin Univ. USA The upgrade of the LHC machine towards higher luminosity (1035 cm-2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector ...

  9. PC Made Easy: Upgrading Computer Collections.

    Science.gov (United States)

    Hannigan, Matt

    1997-01-01

    Provides guidelines for ordering the best computer books, geared to the library's size. Covers series, articles, subjects, and publishers most useful to a broad audience, as well as the best places to seek information on new titles and where to find reviews. Offers time savers for upgrading a computer book collection and discusses weeding…

  10. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5x compared to the design luminosity (10^34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade is expected to happen around 2023. The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 ...

  11. Energy upgrading measures improve also indoor climate

    DEFF Research Database (Denmark)

    Foldbjerg, Peter; Knudsen, Henrik Nellemose

    2014-01-01

    to increase the number of homeowners who venture into a major energy upgrading of their house, the demonstrated positive side effects, more than energy savings, should be included in the communication to motivate homeowners. The barriers should be reduced by “taking the homeowners by the hand” and helping...

  12. Academic Training - LHC luminosity upgrade: detector challenges

    CERN Multimedia

    Françoise Benz

    2006-01-01

    ACADEMIC TRAINING LECTURE SERIES 13, 14, 15, March, from 11:00 to 12:00 - 16 March from 10:00 to 12:00 Main Auditorium, bldg. 500 on 14, 15 March, Council Room on 13, 16 March LHC luminosity upgrade: detector challenges A. De Roeck / CERN-PH, D. Bortoletto / Purdue Univ. USA, R. Wigmans / Texas, Tech Univ. USA, W. Riegler / CERN-PH, W. Smith / Wisconsin Univ. USA The upgrade of the LHC machine towards higher luminosity (1035 cm-2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector ...

  13. UPGRADES TO Monteburns, VERSION 3.0

    Energy Technology Data Exchange (ETDEWEB)

    Galloway, Jack D [Los Alamos National Laboratory; Trellue, Holly R [Los Alamos National Laboratory

    2012-06-22

    Monteburns VERSION 3.0 is an upgrade of the existing Monteburns code available through RSICC. The new version includes modern programming style, increased parallel computing, more accurate capture gamma calculations and an automated input generator. This capability was demonstrated through a small PWR core simulation.

  14. Upgrade of the CERN telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, maintenance work will be carried out on the CERN switching centre between 8.00 p.m. and 10.00 p.m. on Monday 9 October. Telephone services may be disrupted and possibly even interrupted during this time. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  15. ISOLDE Off-line Gas Leak Upgrade

    CERN Document Server

    Nielsen, Kristoffer Bested

    2017-01-01

    This study investigates gas injection system of the ISOLDE Off-line separator. A quadrupole mass spectrometer is used to analysis the composition of the gas. Based on these measurements a contamination of the injected gas is found and a system upgrade is purposed. Furthermore a calibration of the leak rate of the leak valve is made.

  16. The BABAR detector: Upgrades, operation and performance

    Science.gov (United States)

    Aubert, B.; Barate, R.; Boutigny, D.; Couderc, F.; del Amo Sanchez, P.; Gaillard, J.-M.; Hicheur, A.; Karyotakis, Y.; Lees, J. P.; Poireau, V.; Prudent, X.; Robbe, P.; Tisserand, V.; Zghiche, A.; Grauges, E.; Garra Tico, J.; Lopez, L.; Martinelli, M.; Palano, A.; Pappagallo, M.; Pompili, A.; Chen, G. P.; Chen, J. C.; Qi, N. D.; Rong, G.; Wang, P.; Zhu, Y. S.; Eigen, G.; Stugu, B.; Sun, L.; Abrams, G. S.; Battaglia, M.; Borgland, A. W.; Breon, A. B.; Brown, D. N.; Button-Shafer, J.; Cahn, R. N.; Charles, E.; Clark, A. R.; Day, C. T.; Furman, M.; Gill, M. S.; Groysman, Y.; Jacobsen, R. G.; Kadel, R. W.; Kadyk, J. A.; Kerth, L. T.; Kolomensky, Yu. G.; Kral, J. F.; Kukartsev, G.; LeClerc, C.; Levi, M. E.; Lynch, G.; Merchant, A. M.; Mir, L. M.; Oddone, P. J.; Orimoto, T. J.; Osipenkov, I. L.; Pripstein, M.; Roe, N. A.; Romosan, A.; Ronan, M. T.; Shelkov, V. G.; Suzuki, A.; Tackmann, K.; Tanabe, T.; Wenzel, W. A.; Zisman, M.; Barrett, M.; Bright-Thomas, P. G.; Ford, K. E.; Harrison, T. J.; Hart, A. J.; Hawkes, C. M.; Knowles, D. J.; Morgan, S. E.; O'Neale, S. W.; Penny, R. C.; Smith, D.; Soni, N.; Watson, A. T.; Watson, N. K.; Goetzen, K.; Held, T.; Koch, H.; Kunze, M.; Lewandowski, B.; Pelizaeus, M.; Peters, K.; Schmuecker, H.; Schroeder, T.; Steinke, M.; Fella, A.; Antonioli, E.; Boyd, J. T.; Chevalier, N.; Cottingham, W. N.; Foster, B.; Mackay, C.; Walker, D.; Abe, K.; Asgeirsson, D. J.; Cuhadar-Donszelmann, T.; Fulsom, B. G.; Hearty, C.; Knecht, N. S.; Mattison, T. S.; McKenna, J. A.; Thiessen, D.; Khan, A.; Kyberd, P.; McKemey, A. K.; Randle-Conde, A.; Saleem, M.; Sherwood, D. J.; Teodorescu, L.; Blinov, V. E.; Bukin, A. D.; Buzykaev, A. R.; Druzhinin, V. P.; Golubev, V. B.; Korol, A. A.; Kravchenko, E. A.; Onuchin, A. P.; Serednyakov, S. I.; Skovpen, Yu. I.; Solodov, E. P.; Telnov, V. I.; Todyshev, K. Yu.; Yushkov, A. N.; Best, D. S.; Bondioli, M.; Bruinsma, M.; Chao, M.; Curry, S.; Eschrich, I.; Kirkby, D.; Lankford, A. J.; Mandelkern, M.; Martin, E. C.; McMahon, S.; Mommsen, R. K.; Stoker, D. P.; Abachi, S.; Buchanan, C.; Hartfiel, B. L.; Weinstein, A. J. R.; Atmacan, H.; Foulkes, S. D.; Gary, J. W.; Layter, J.; Liu, F.; Long, O.; Shen, B. C.; Vitug, G. M.; Wang, K.; Yasin, Z.; Zhang, L.; Hadavand, H. K.; Hill, E. J.; Paar, H. P.; Rahatlou, S.; Schwanke, U.; Sharma, V.; Berryhill, J. W.; Campagnari, C.; Cunha, A.; Dahmes, B.; Hong, T. M.; Kovalskyi, D.; Kuznetsova, N.; Levy, S. L.; Lu, A.; Mazur, M. A.; Richman, J. D.; Verkerke, W.; Beck, T. W.; Beringer, J.; Eisner, A. M.; Flacco, C. J.; Grillo, A. A.; Grothe, M.; Heusch, C. A.; Kroseberg, J.; Lockman, W. S.; Martinez, A. J.; Nesom, G.; Schalk, T.; Schmitz, R. E.; Schumm, B. A.; Seiden, A.; Spencer, E.; Spradlin, P.; Turri, M.; Walkowiak, W.; Wang, L.; Wilder, M.; Williams, D. C.; Wilson, M. G.; Winstrom, L. O.; Chen, E.; Cheng, C. H.; Doll, D. A.; Dorsten, M. P.; Dvoretskii, A.; Echenard, B.; Erwin, R. J.; Fang, F.; Flood, K.; Hitlin, D. G.; Metzler, S.; Narsky, I.; Oyang, J.; Piatenko, T.; Porter, F. C.; Ryd, A.; Samuel, A.; Yang, S.; Zhu, R. Y.; Andreassen, R.; Devmal, S.; Geld, T. L.; Jayatilleke, S.; Mancinelli, G.; Meadows, B. T.; Mishra, K.; Sokoloff, M. D.; Abe, T.; Antillon, E. A.; Barillari, T.; Becker, J.; Blanc, F.; Bloom, P. C.; Chen, S.; Clifton, Z. C.; Derrington, I. M.; Destree, J.; Dima, M. O.; Ford, W. T.; Gaz, A.; Gilman, J. D.; Hachtel, J.; Hirschauer, J. F.; Johnson, D. R.; Kreisel, A.; Nagel, M.; Nauenberg, U.; Olivas, A.; Rankin, P.; Roy, J.; Ruddick, W. O.; Smith, J. G.; Ulmer, K. A.; van Hoek, W. C.; Wagner, S. R.; West, C. G.; Zhang, J.; Ayad, R.; Blouw, J.; Chen, A.; Eckhart, E. A.; Harton, J. L.; Hu, T.; Toki, W. H.; Wilson, R. J.; Winklmeier, F.; Zeng, Q. L.; Altenburg, D.; Feltresi, E.; Hauke, A.; Jasper, H.; Karbach, M.; Merkel, J.; Petzold, A.; Spaan, B.; Wacker, K.; Brandt, T.; Brose, J.; Colberg, T.; Dahlinger, G.; Dickopp, M.; Eckstein, P.; Futterschneider, H.; Kaiser, S.; Kobel, M. J.; Krause, R.; Müller-Pfefferkorn, R.; Mader, W. F.; Maly, E.; Nogowski, R.; Otto, S.; Schubert, J.; Schubert, K. R.; Schwierz, R.; Sundermann, J. E.; Volk, A.; Wilden, L.; Bernard, D.; Brochard, F.; Cohen-Tanugi, J.; Dohou, F.; Ferrag, S.; Latour, E.; Mathieu, A.; Renard, C.; Schrenk, S.; T'Jampens, S.; Thiebaux, Ch.; Vasileiadis, G.; Verderi, M.; Anjomshoaa, A.; Bernet, R.; Clark, P. J.; Lavin, D. R.; Muheim, F.; Playfer, S.; Robertson, A. I.; Swain, J. E.; Watson, J. E.; Xie, Y.; Andreotti, D.; Andreotti, M.; Bettoni, D.; Bozzi, C.; Calabrese, R.; Carassiti, V.; Cecchi, A.; Cibinetto, G.; Cotta Ramusino, A.; Evangelisti, F.; Fioravanti, E.; Franchini, P.; Garzia, I.; Landi, L.; Luppi, E.; Malaguti, R.; Negrini, M.; Padoan, C.; Petrella, A.; Piemontese, L.; Santoro, V.; Sarti, A.; Anulli, F.; Baldini-Ferroli, R.; Calcaterra, A.; Finocchiaro, G.; Pacetti, S.; Patteri, P.; Peruzzi, I. M.; Piccolo, M.; Rama, M.; de Sangro, R.; Santoni, M.; Zallo, A.; Bagnasco, S.; Buzzo, A.; Capra, R.; Contri, R.; Crosetti, G.; Lo Vetere, M.; Macri, M. M.; Minutoli, S.; Monge, M. R.; Musico, P.; Passaggio, S.; Pastore, F. C.; Patrignani, C.; Pia, M. G.; Robutti, E.; Santroni, A.; Tosi, S.; Bhuyan, B.; Prasad, V.; Bailey, S.; Brandenburg, G.; Chaisanguanthum, K. S.; Lee, C. L.; Morii, M.; Won, E.; Wu, J.; Adametz, A.; Dubitzky, R. S.; Marks, J.; Schenk, S.; Uwer, U.; Klose, V.; Lacker, H. M.; Aspinwall, M. L.; Bhimji, W.; Bowerman, D. A.; Dauncey, P. D.; Egede, U.; Flack, R. L.; Gaillard, J. R.; Gunawardane, N. J. W.; Morton, G. W.; Nash, J. A.; Nikolich, M. B.; Panduro Vazquez, W.; Sanders, P.; Smith, D.; Taylor, G. P.; Tibbetts, M.; Behera, P. K.; Chai, X.; Charles, M. J.; Grenier, G. J.; Hamilton, R.; Lee, S.-J.; Mallik, U.; Meyer, N. T.; Chen, C.; Cochran, J.; Crawley, H. B.; Dong, L.; Eyges, V.; Fischer, P.-A.; Lamsa, J.; Meyer, W. T.; Prell, S.; Rosenberg, E. I.; Rubin, A. E.; Gao, Y. Y.; Gritsan, A. V.; Guo, Z. J.; Lae, C. K.; Schott, G.; Albert, J. N.; Arnaud, N.; Beigbeder, C.; Breton, D.; Davier, M.; Derkach, D.; Dû, S.; Firmino da Costa, J.; Grosdidier, G.; Höcker, A.; Laplace, S.; Le Diberder, F.; Lepeltier, V.; Lutz, A. M.; Malaescu, B.; Nief, J. Y.; Petersen, T. C.; Plaszczynski, S.; Pruvot, S.; Roudeau, P.; Schune, M. H.; Serrano, J.; Sordini, V.; Stocchi, A.; Tocut, V.; Trincaz-Duvoid, S.; Wang, L. L.; Wormser, G.; Bionta, R. M.; Brigljević, V.; Lange, D. J.; Simani, M. C.; Wright, D. M.; Bingham, I.; Burke, J. P.; Chavez, C. A.; Coleman, J. P.; Forster, I. J.; Fry, J. R.; Gabathuler, E.; Gamet, R.; George, M.; Hutchcroft, D. E.; Kay, M.; Parry, R. J.; Payne, D. J.; Schofield, K. C.; Sloane, R. J.; Touramanis, C.; Azzopardi, D. E.; Bellodi, G.; Bevan, A. J.; Clarke, C. K.; Cormack, C. M.; Di Lodovico, F.; Dixon, P.; George, K. A.; Menges, W.; Potter, R. J. L.; Sacco, R.; Shorthouse, H. W.; Sigamani, M.; Strother, P.; Vidal, P. B.; Brown, C. L.; Cowan, G.; Flaecher, H. U.; George, S.; Green, M. G.; Hopkins, D. A.; Jackson, P. S.; Kurup, A.; Marker, C. E.; McGrath, P.; McMahon, T. R.; Paramesvaran, S.; Salvatore, F.; Vaitsas, G.; Winter, M. A.; Wren, A. C.; Brown, D. N.; Davis, C. L.; Denig, A. G.; Fritsch, M.; Gradl, W.; Griessinger, K.; Hafner, A.; Prencipe, E.; Allison, J.; Alwyn, K. E.; Bailey, D. S.; Barlow, N. R.; Barlow, R. J.; Chia, Y. M.; Edgar, C. L.; Forti, A. C.; Fullwood, J.; Hart, P. A.; Hodgkinson, M. C.; Jackson, F.; Jackson, G.; Kelly, M. P.; Kolya, S. D.; Lafferty, G. D.; Lyon, A. J.; Naisbit, M. T.; Savvas, N.; Weatherall, J. H.; West, T. J.; Williams, J. C.; Yi, J. I.; Anderson, J.; Farbin, A.; Hulsbergen, W. D.; Jawahery, A.; Lillard, V.; Roberts, D. A.; Schieck, J. R.; Simi, G.; Tuggle, J. M.; Blaylock, G.; Dallapiccola, C.; Hertzbach, S. S.; Kofler, R.; Koptchev, V. B.; Li, X.; Moore, T. B.; Salvati, E.; Saremi, S.; Staengle, H.; Willocq, S. Y.; Cowan, R.; Dujmic, D.; Fisher, P. H.; Henderson, S. W.; Koeneke, K.; Lang, M. I.; Sciolla, G.; Spitznagel, M.; Taylor, F.; Yamamoto, R. K.; Yi, M.; Zhao, M.; Zheng, Y.; Klemetti, M.; Lindemann, D.; Mangeol, D. J. J.; Mclachlin, S. E.; Milek, M.; Patel, P. M.; Robertson, S. H.; Biassoni, P.; Cerizza, G.; Lazzaro, A.; Lombardo, V.; Neri, N.; Palombo, F.; Pellegrini, R.; Stracka, S.; Bauer, J. M.; Cremaldi, L.; Eschenburg, V.; Kroeger, R.; Reidy, J.; Sanders, D. A.; Summers, D. J.; Zhao, H. W.; Godang, R.; Brunet, S.; Cote, D.; Nguyen, X.; Simard, M.; Taras, P.; Viaud, B.; Nicholson, H.; Cavallo, N.; De Nardo, G.; Fabozzi, F.; Gatto, C.; Lista, L.; Monorchio, D.; Onorato, G.; Paolucci, P.; Piccolo, D.; Sciacca, C.; Baak, M. A.; Raven, G.; Snoek, H. L.; Jessop, C. P.; Knoepfel, K. J.; LoSecco, J. M.; Wang, W. F.; Allmendinger, T.; Benelli, G.; Brau, B.; Corwin, L. A.; Gan, K. K.; Honscheid, K.; Hufnagel, D.; Kagan, H.; Kass, R.; Morris, J. P.; Rahimi, A. M.; Regensburger, J. J.; Smith, D. S.; Ter-Antonyan, R.; Wong, Q. K.; Blount, N. L.; Brau, J.; Frey, R.; Igonkina, O.; Iwasaki, M.; Kolb, J. A.; Lu, M.; Potter, C. T.; Rahmat, R.; Sinev, N. B.; Strom, D.; Strube, J.; Torrence, E.; Borsato, E.; Castelli, G.; Colecchia, F.; Crescente, A.; Dal Corso, F.; Dorigo, A.; Fanin, C.; Furano, F.; Gagliardi, N.; Galeazzi, F.; Margoni, M.; Marzolla, M.; Michelon, G.; Morandin, M.; Posocco, M.; Rotondo, M.; Simonetto, F.; Solagna, P.; Stevanato, E.; Stroili, R.; Tiozzo, G.; Voci, C.; Akar, S.; Bailly, P.; Ben-Haim, E.; Bonneaud, G.; Briand, H.; Chauveau, J.; Hamon, O.; John, M. J. J.; Lebbolo, H.; Leruste, Ph.; Malclès, J.; Marchiori, G.; Martin, L.; Ocariz, J.; Perez, A.; Pivk, M.; Prendki, J.; Roos, L.; Sitt, S.; Stark, J.; Thérin, G.; Vallereau, A.; Biasini, M.; Covarelli, R.; Manoni, E.; Pennazzi, S.; Pioppi, M.; Angelini, C.; Batignani, G.; Bettarini, S.; Bosi, F.; Bucci, F.; Calderini, G.; Carpinelli, M.; Cenci, R.; Cervelli, A.; Forti, F.; Giorgi, M. A.; Lusiani, A.; Marchiori, G.; Morganti, M.; Morsani, F.; Paoloni, E.; Raffaelli, F.; Rizzo, G.; Sandrelli, F.; Triggiani, G.; Walsh, J. J.; Haire, M.; Judd, D.; Biesiada, J.; Danielson, N.; Elmer, P.; Fernholz, R. E.; Lau, Y. P.; Lu, C.; Miftakov, V.; Olsen, J.; Lopes Pegna, D.; Sands, W. R.; Smith, A. J. S.; Telnov, A. V.; Tumanov, A.; Varnes, E. W.; Baracchini, E.; Bellini, F.; Bulfon, C.; Buccheri, E.; Cavoto, G.; D'Orazio, A.; Di Marco, E.; Faccini, R.; Ferrarotto, F.; Ferroni, F.; Gaspero, M.; Jackson, P. D.; Lamanna, E.; Leonardi, E.; Li Gioi, L.; Lunadei, R.; Mazzoni, M. A.; Morganti, S.; Piredda, G.; Polci, F.; del Re, D.; Renga, F.; Safai Tehrani, F.; Serra, M.; Voena, C.; Bünger, C.; Christ, S.; Hartmann, T.; Leddig, T.; Schröder, H.; Wagner, G.; Waldi, R.; Adye, T.; Bly, M.; Brew, C.; Condurache, C.; De Groot, N.; Franek, B.; Geddes, N. I.; Gopal, G. P.; Olaiya, E. O.; Ricciardi, S.; Roethel, W.; Wilson, F. F.; Xella, S. M.; Aleksan, R.; Bourgeois, P.; Emery, S.; Escalier, M.; Esteve, L.; Gaidot, A.; Ganzhur, S. F.; Giraud, P.-F.; Georgette, Z.; Graziani, G.; Hamel de Monchenault, G.; Kozanecki, W.; Langer, M.; Legendre, M.; London, G. W.; Mayer, B.; Micout, P.; Serfass, B.; Vasseur, G.; Yèche, Ch.; Zito, M.; Allen, M. T.; Akre, R.; Aston, D.; Azemoon, T.; Bard, D. J.; Bartelt, J.; Bartoldus, R.; Bechtle, P.; Becla, J.; Benitez, J. F.; Berger, N.; Bertsche, K.; Boeheim, C. T.; Bouldin, K.; Boyarski, A. M.; Boyce, R. F.; Browne, M.; Buchmueller, O. L.; Burgess, W.; Cai, Y.; Cartaro, C.; Ceseracciu, A.; Claus, R.; Convery, M. R.; Coupal, D. P.; Craddock, W. W.; Crane, G.; Cristinziani, M.; DeBarger, S.; Decker, F. J.; Dingfelder, J. C.; Donald, M.; Dorfan, J.; Dubois-Felsmann, G. P.; Dunwoodie, W.; Ebert, M.; Ecklund, S.; Erickson, R.; Fan, S.; Field, R. C.; Fisher, A.; Fox, J.; Franco Sevilla, M.; Fulsom, B. G.; Gabareen, A. M.; Gaponenko, I.; Glanzman, T.; Gowdy, S. J.; Graham, M. T.; Grenier, P.; Hadig, T.; Halyo, V.; Haller, G.; Hamilton, J.; Hanushevsky, A.; Hasan, A.; Hast, C.; Hee, C.; Himel, T.; Hryn'ova, T.; Huffer, M. E.; Hung, T.; Innes, W. R.; Iverson, R.; Kaminski, J.; Kelsey, M. H.; Kim, H.; Kim, P.; Kharakh, D.; Kocian, M. L.; Krasnykh, A.; Krebs, J.; Kroeger, W.; Kulikov, A.; Kurita, N.; Langenegger, U.; Leith, D. W. G. S.; Lewis, P.; Li, S.; Libby, J.; Lindquist, B.; Luitz, S.; Lüth, V.; Lynch, H. L.; MacFarlane, D. B.; Marsiske, H.; McCulloch, M.; McDonald, J.; Melen, R.; Menke, S.; Metcalfe, S.; Messner, R.; Moss, L. J.; Mount, R.; Muller, D. R.; Neal, H.; Nelson, D.; Nelson, S.; Nordby, M.; Nosochkov, Y.; Novokhatski, A.; O'Grady, C. P.; O'Neill, F. G.; Ofte, I.; Ozcan, V. E.; Perazzo, A.; Perl, M.; Petrak, S.; Piemontese, M.; Pierson, S.; Pulliam, T.; Ratcliff, B. N.; Ratkovsky, S.; Reif, R.; Rivetta, C.; Rodriguez, R.; Roodman, A.; Salnikov, A. A.; Schietinger, T.; Schindler, R. H.; Schwarz, H.; Schwiening, J.; Seeman, J.; Smith, D.; Snyder, A.; Soha, A.; Stanek, M.; Stelzer, J.; Su, D.; Sullivan, M. K.; Suzuki, K.; Swain, S. K.; Tanaka, H. A.; Teytelman, D.; Thompson, J. M.; Tinslay, J. S.; Trunov, A.; Turner, J.; van Bakel, N.; van Winkle, D.; Va'vra, J.; Wagner, A. P.; Weaver, M.; Weinstein, A. J. R.; Weber, T.; West, C. A.; Wienands, U.; Wisniewski, W. J.; Wittgen, M.; Wittmer, W.; Wright, D. H.; Wulsin, H. W.; Yan, Y.; Yarritu, A. K.; Yi, K.; Yocky, G.; Young, C. C.; Ziegler, V.; Chen, X. R.; Liu, H.; Park, W.; Purohit, M. V.; Singh, H.; Weidemann, A. W.; White, R. M.; Wilson, J. R.; Yumiceva, F. X.; Sekula, S. J.; Bellis, M.; Burchat, P. R.; Edwards, A. J.; Majewski, S. A.; Meyer, T. I.; Miyashita, T. S.; Petersen, B. A.; Roat, C.; Ahmed, M.; Ahmed, S.; Alam, M. S.; Bula, R.; Ernst, J. A.; Jain, V.; Liu, J.; Pan, B.; Saeed, M. A.; Wappler, F. R.; Zain, S. B.; Gorodeisky, R.; Guttman, N.; Peimer, D.; Soffer, A.; De Silva, A.; Lund, P.; Krishnamurthy, M.; Ragghianti, G.; Spanier, S. M.; Wogsland, B. J.; Eckmann, R.; Ritchie, J. L.; Ruland, A. M.; Satpathy, A.; Schilling, C. J.; Schwitters, R. F.; Wray, B. C.; Drummond, B. W.; Izen, J. M.; Kitayama, I.; Lou, X. C.; Ye, S.; Bianchi, F.; Bona, M.; Gallo, F.; Gamba, D.; Pelliccioni, M.; Bomben, M.; Borean, C.; Bosisio, L.; Cossutti, F.; Della Ricca, G.; Dittongo, S.; Grancagnolo, S.; Lanceri, L.; Poropat, P.; Rashevskaya, I.; Vitale, L.; Vuagnin, G.; Manfredi, P. F.; Re, V.; Speziali, V.; Frank, E. D.; Gladney, L.; Guo, Q. H.; Panetta, J.; Azzolini, V.; Lopez-March, N.; Martinez-Vidal, F.; Milanes, D. A.; Oyanguren, A.; Agarwal, A.; Albert, J.; Banerjee, Sw.; Bernlochner, F. U.; Brown, C. M.; Choi, H. H. F.; Fortin, D.; Fransham, K. B.; Hamano, K.; Kowalewski, R.; Lewczuk, M. J.; Nugent, I. M.; Roney, J. M.; Sobie, R. J.; Back, J. J.; Gershon, T. J.; Harrison, P. F.; Ilic, J.; Latham, T. E.; Mohanty, G. B.; Puccio, E.; Band, H. R.; Chen, X.; Cheng, B.; Dasu, S.; Datta, M.; Eichenbaum, A. M.; Hollar, J. J.; Hu, H.; Johnson, J. R.; Kutter, P. E.; Li, H.; Liu, R.; Mellado, B.; Mihalyi, A.; Mohapatra, A. K.; Pan, Y.; Pierini, M.; Prepost, R.; Scott, I. J.; Tan, P.; Vuosalo, C. O.; von Wimmersperg-Toeller, J. H.; Wu, S. L.; Yu, Z.; Greene, M. G.; Kordich, T. M. B.

    2013-11-01

    The BABAR detector operated successfully at the PEP-II asymmetric e+e- collider at the SLAC National Accelerator Laboratory from 1999 to 2008. This report covers upgrades, operation, and performance of the collider and the detector systems, as well as the trigger, online and offline computing, and aspects of event reconstruction since the beginning of data taking.

  17. The JLAB 12 GeV Energy Upgrade of CEBAF

    Energy Technology Data Exchange (ETDEWEB)

    Harwood, Leigh H. [JLAB

    2013-12-01

    This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, procurement, installation and commissioning of the magnet and SRF components of the upgrade.

  18. Project Design Concept for Monitoring and Control System

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-10-02

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations.

  19. ATLAS Upgrade: meeting the challenges of the sLHC

    CERN Document Server

    Loginov, A; The ATLAS collaboration

    2011-01-01

    With the Large Hadron Collider (LHC) providing pp collisions data at sqrt(s)=7 TeV, plans are already advancing for a series of upgrades leading eventually to about 5 x 10^{34} cm-2 s-1 some ten years from now in the super-LHC (sLHC) project. The goal is to extend the dataset from about few hundreds fb-1 expected by 2020 to few thousands fb-1 by around 2030. High instantaneous and integrated luminosities are the challenge that will require many changes to the ATLAS detector. The designs are developing rapidly for a new tracking detector, significant changes in the calorimeter and muon systems, as well as improved triggers and data acquisition system. These proceedings summarise the environment expected at the sLHC and the status of the improvements to the ATLAS detector.

  20. Electron Cloud Studies for the Upgrade of the CERN PS

    CERN Document Server

    Iadarola, G; Gilardoni, S; Rumolo, G; Sterbini, G; Yin Vallgren, C; Pivi, M; Rioja-Fuentelsaz, S

    2013-01-01

    The observation of a significant dynamic pressure rise as well as measurements with dedicated detectors indicate that an electron cloud develops in the CERN PS during the last stages of the RF manipulations for the production of LHC type beams, especially with 25 ns bunch spacing. Although presently these beams are not degraded by the interaction with the electron cloud, which develops only during few milliseconds before extraction, the question if this effect could degrade the future high intensity and high brightness beams foreseen by the LHC Injectors Upgrade project is still open. Therefore several studies are being carried out employing both simulations and measurements with the electron cloud detectors in the machine. The aim is to develop a reliable electron cloud model of the PS vacuum chambers in order to identify possible future limitations and find suitable countermeasures.

  1. Upgrade of the ALICE-TPC read-out electronics

    Energy Technology Data Exchange (ETDEWEB)

    Junique, A; Mager, M; Musa, L; Rehman, A Ur, E-mail: Magnus.Mager@cern.ch [CERN, Geneva (Switzerland)

    2010-12-15

    The ALICE experiment at CERN LHC employs a large volume time projection chamber (TPC) as its main tracking device. Instigated by analyses indicating that the high level trigger is capable of sifting events with rare physics probes, it is endeavoured to read out the TPC an order of magnitude faster then was reckoned during the design of its read-out electronics. Based on an analysis of the read-out performance of the current system, an upgrade of the front-end read-out network is proposed. The performance of the foreseen architecture is simulated with raw data from real 7 TeV pp collisions. Events are superimposed in order to emulate the future ALICE running conditions: high multiplicity events generated either by PbPb collisions or by the superposition (pile-up) of a large number of pp collisions. The first prototype of the main building block has been produced and characterised, demonstrating the feasibility of the approach.

  2. Upgradation of MOT and its Relevance to WET Campaigns

    Indian Academy of Sciences (India)

    Alisher S. Hojaev

    2005-06-01

    The Maidanak One-meter Telescope (MOT) is a Ritchey-Chretien telescope by Carl Zeiss, located atop Maidanak in Uzbekistan, where site parameters indicate excellent atmospheric seeing conditions. An effort to computerize the MOT, jointly made by an Uzbek, Taiwanese and Baltic consortium, is expected to complete in 2005. Monitoring the variability of star clusters will be among the first scientific projects to be carried out. Equipped with sensitive CCD cameras, the MOT, with its middle-Asia geographic location, will be a desirable addition to the Whole Earth Telescope (WET) network.We describe the upgrade engineering and instrumentation of the telescope and how the system can be used in future campaigns.

  3. Upgrade of the ALICE-TPC read-out electronics

    CERN Document Server

    Junique, A; Musa , L; Rehman , A U

    2010-01-01

    The ALICE experiment at CERN LHC employs a large volume time projection chamber (TPC) as its main tracking device. Instigated by analyses indicating that the high level trigger is capable of sifting events with rare physics probes, it is endeavoured to read out the TPC an order of magnitude faster then was reckoned during the design of its read-out electronics. Based on an analysis of the read-out performance of the current system, an upgrade of the front-end read-out network is proposed. The performance of the foreseen architecture is simulated with raw data from real 7 TeV pp collisions. Events are superimposed in order to emulate the future ALICE running conditions: high multiplicity events generated either by PbPb collisions or by the superposition (pile-up) of a large number of pp collisions. The first prototype of the main building block has been produced and characterised, demonstrating the feasibility of the approach

  4. Successful upgrading under pressure of time; Unter Zeitdruck erfolgreich modernisiert

    Energy Technology Data Exchange (ETDEWEB)

    Haas, M. [Sulzer Hydro AG, Zurich (Switzerland); Gislason, G. [Landsvirkjun (Iceland)

    1998-07-01

    Burfell power station in Iceland is an excellent example of comprehensive upgrading thanks to partnerly relations between customer and supplier. This project has proved that runner replacement should not be treated individually in hydroelectric power plant modernizations, but as part of an overall refurbishing concept. To shorten delivery times, some innovative development and manufacturing methods were introduced. (orig.) [Deutsch] Das Kraftwerk Burfell in Island ist ein Beispiel fuer einen Umbau mit gesamtheitlicher Betrachtung und einer partnerschaftlichen Beziehung zwischen Kunde und Lieferant. Das Projekt hat bewiesen, dass beim Umbau von Wasserkraftwerken ein Laufradersatz nicht isoliert betrachtet werden darf, sondern in ein Gesamtkonzept innerhalb der bestehenden Anlage einzubinden ist. Zur Verkuerzung der Lieferzeiten wurden neue Wege in der Entwicklung und Fertigung der Komponenten beschritten. (orig.)

  5. Fast control latency uncertainty elimination for the BESIII ETOF upgrade

    Science.gov (United States)

    Wang, Yun; Cao, Ping; Liu, Shu-bin; An, Qi

    2016-09-01

    A new fanning topology is proposed to precisely fan out fast control signals in the Beijing Spectrometer (BESIII) end-cap time-of-flight (ETOF) electronics. However, uncertainty in transfer latency is introduced by the new fanning channel, which will degrade the precision of fast control. In this paper, latency uncertainty elimination for the BESIII ETOF upgrade is introduced. The latency uncertainty is determined by a Time-Digital-Converter (TDC) embedded in a Field-Programmable Gate Array (FPGA) and is eliminated by re-capturing at synchronous and determinate time. Compared with the existing method of Barrel-cap TOF (BTOF), it has advantages of flexible structure, easy calibration and good adaptability. Field tests on the BESIII ETOF system show that this method effectively eliminates transfer latency uncertainty. Supported by CAS Maintenance Project for Major Scientific and Technological Infrastructure (IHEP-SW-953/2013)

  6. Micromegas detectors for the upgrade of the ATLAS muon spectrometer

    Science.gov (United States)

    Zibell, A.

    2014-08-01

    The upcoming luminosity upgrades of the LHC accelerator up to an ultimate value of 5 × 1034 cm-2s-1 require a replacement of the innermost forward muon tracking stations (Small Wheels) of the ATLAS detector in 2018 and 2019. These New Small Wheels (NSW) will contain resistive strip micromegas and small-strip Thin Gap Chamber detectors. The resistive strip micromegas detector concept is presented, together with the μTPC (micro Time Projection Chamber) track reconstruction technique for a single plane track angle measurement. The mechanical layout of the NSW micromegas chambers is discussed as well, as the features of the specially designed front-end electronics. A pre-series micromegas chamber will be installed within ATLAS already in 2014. It will be integrated into the ATLAS data acquisition system with help of a custom micromegas Read Out Driver (ROD), based on the Scalable Readout System (SRS).

  7. Pressure Safety of JLAB 12GeV Upgrade Cryomodule

    Energy Technology Data Exchange (ETDEWEB)

    Cheng, Gary [JLAB; Wiseman, Mark A. [JLAB; Daly, Ed [JLAB

    2009-11-01

    This paper reviews pressure safety considerations, per the US Department of Energy (DOE) 10CFR851 Final Rule [1], which are being implemented during construction of the 100 Megavolt Cryomodule (C100 CM) for Jefferson Lab’s 12 GeV Upgrade Project. The C100 CM contains several essential subsystems that require pressure safety measures: piping in the supply and return end cans, piping in the thermal shield and the helium headers, the helium vessel assembly which includes high RRR niobium cavities, the end cans, and the vacuum vessel. Due to the vessel sizes and pressure ranges, applicable national consensus code rules are applied. When national consensus codes are not applicable, equivalent design and fabrication approaches are identified and implemented. Considerations for design, material qualification, fabrication, inspection and examination are summarized. In addition, JLAB’s methodologies for implementation of the 10 CFR 851 requirements are described.

  8. Design study of an upgraded charge breeder for ISOLDE

    CERN Document Server

    Shornikov, A; Wenander, F; Pikin, A

    2013-01-01

    In this work we present our progress in the design study of a new Electron Beam Ion Source (EBIS) to be installed as a charge breeder for reacceleration of rare ions at ISOLDE. The work is triggered by the HIE-ISOLDE upgrade {[}1] and the planned TSR@ISOLDE project {[}2]. To fulfill the requests of the user community the new EBIS should reach an electron beam density of 10(4) A/cm(2) at electron energies up to 150 key and, provide UHV environment and ion cooling in the breeding region to ensure confinement of the ions long enough to reach the requested charge states. We report on the established design parameters and first prototyping steps towards production and testing of suitable equipment. (C) 2013 Elsevier B.V. All rights reserved.

  9. Upgrading Preschool Environment in a Swedish Municipality: Evaluation of an Implementation Process.

    Science.gov (United States)

    Altin, Carolina; Kvist Lindholm, Sofia; Wejdmark, Mats; Lättman-Masch, Robert; Boldemann, Cecilia

    2015-07-01

    Redesigning outdoor preschool environment may favorably affect multiple factors relevant to health and reach many children. Cross-sectional studies in various landscapes at different latitudes have explored the characteristics of preschool outdoor environment considering the play potential triggering combined physical activity and sun-protective behavior due to space, vegetation, and topography. Criteria were pinpointed to upgrade preschool outdoor environment for multiple health outcomes to be applied in local government in charge of public preschools. Purposeful land use policies and administrative management of outdoor land use may serve to monitor the quality of preschool outdoor environments (upgrading and planning). This study evaluates the process of implementing routines for upgrading outdoor preschool environments in a medium-sized municipality, Sweden, 2008-2011, using qualitative and quantitative analysis. Recorded written material (logs and protocols) related to the project was processed using thematic analysis. Quantitative data (m(2) flat/multileveled, overgrown/naked surface, and fraction of free visible sky) were analyzed to assess the impact of implementation (surface, topography, greenery integrated in play). The preschool outdoor environments were upgraded accordingly. The quality of implementation was assessed using the theory of policy streams approach. Though long-term impact remains to be confirmed the process seems to have changed work routines in the interior management for purposeful upgrading of preschool outdoor environments. The aptitude and applicability of inexpensive methods for assessing, selecting, and upgrading preschool land at various latitudes, climates, and outdoor play policies (including gender aspects and staff policies) should be further discussed, as well as the compilation of data for monitoring and evaluation.

  10. Completion of the Brightness Upgrade of the ALS

    Science.gov (United States)

    Steier, C.; Madur, A.; Bailey, B.; Berg, K.; Biocca, A.; Black, A.; Casey, P.; Colomb, D.; Gunion, B.; Li, N.; Marks, S.; Nishimura, H.; Pappas, C.; Petermann, K.; Portmann, G.; Prestemon, S.; Rawlins, A.; Robin, D.; Rossi, S.; Scarvie, T.; Schlueter, R.; Sun, C.; Tarawneh, H.; Wan, W.; Williams, E.; Yin, L.; Zhou, Q.; Jin, J.; Zhang, J.; Chen, C.; Wen, Y.; Wu, J.

    2014-03-01

    The Advanced Light Source (ALS) at Berkeley Lab remains one of the brightest sources for soft x-rays worldwide. A multiyear upgrade of the ALS is underway, which includes new and replacement x-ray beamlines, a replacement of many of the original insertion devices and many upgrades to the accelerator. The accelerator upgrade that affects the ALS performance most directly is the ALS brightness upgrade [1], which reduces the horizontal emittance from 6.3 to 2.0 nm (2.5 nm effective). Magnets for this upgrade were installed in late 2012 and early 2013 followed by user operation with the reduced emittance.

  11. Performance of HT-WGS Catalysts for Upgrading of Syngas Obtained from Biomass Gasification

    Energy Technology Data Exchange (ETDEWEB)

    Marano Bujan, M.; Sanchez Hervas, J. M.

    2009-05-21

    Oxygen pressurized gasification of biomass out stands as a very promising approach to obtain energy or hydrogen from renewable sources. The technical feasibility of this technology is being investigated under the scope of the VI FP CHRISGAS project, which has started in September 2004 and has a duration of five years. The Division of Combustion and Gasification of CIEMAT participates in this project in Work Package 13: Ancillary and novel processes, studying innovative gas separation and gas upgrading systems. Such systems include novel or available high temperature water gas shift catalysts and commercially available membranes not yet tried in this type of atmosphere. This report describes the activities carried out during the period 2005-2007 regarding the performance of high temperature water gas shift catalysts for upgrading of synthesis gas obtained from biomass gasification. (Author) 28 refs.

  12. The sROD module for the ATLAS Tile Calorimeter upgrade demonstrator

    CERN Document Server

    Carrio Argos, Fernando; The ATLAS collaboration

    2014-01-01

    This work presents the first prototype of the super Read-Out Driver (sROD) demonstrator board for the Tile Calorimeter Demonstrator project. This project aims to test the new readout electronics architecture for the Phase 2 Upgrade of the ATLAS Tile Calorimeter, replacing the front-end electronics of one complete drawer with the new electronics during the Long Shutdown 1 (2013-2014), in order to evaluate its performance. The sROD demonstrator board will receive and process data from a complete module. Moreover the sROD demonstrator board will send preprocessed data to the present trigger system, and will transmit trigger control and timing information (TTC) and Detector Control System (DCS) commands to the front-end. A detailed description of the sROD board design, firmware and control and data acquisition software. We also will present the first results of this module during the commissioning of the upgraded TileCal module.

  13. CMS Forward Calorimeters Phase II Upgrade

    CERN Document Server

    Bilki, Burak

    2014-01-01

    The Phase II Upgrade of the CMS forward calorimeters (electromagnetic and hadronic) originates from the fact that these calorimeters will not be sufficiently performant with the expected High Luminosity LHC conditions, planned to be started in 2025. The major challenge is to preserve/improve the high performance of the current forward detectors with new devices that can withstand the unprecedented radiation levels and disentangle the very large event pileup. CMS elected two design concepts to be presented in the Phase II Upgrade Technical Proposal Shashlik electromagnetic calorimeter + Hadronic Endcap Rebuild, and High Granularity Calorimeter. The former concept is based on reconstructing the endcap electromagnetic calorimeter with a shashlik design and replacing the active media of the endcap hadron calorimeter with radiation tolerant active media with a possibility to extend the coverage. The latter concept is concentrating on constructing a high granularity (both longitudinally and laterally) calorimeter ...

  14. Phase 2 Upgrade of the CMS Tracker

    CERN Document Server

    Mersi, Stefano

    2014-01-01

    An upgrade program is planned for the LHC which will smoothly bring the luminosity up to or above ${5\\times10^{34}\\,\\mathrm{cm^{-2}}\\mathrm{s^{-1}}}$ sometimes after 2020, to possibly reach an integrated luminosity of ${3000\\,\\mathrm{fb^{-1}}}$ at the end of that decade. In this ultimate scenario, called Phase-2, when LHC will reach the High Luminosity phase (HL-LHC), CMS will need a completely new Tracker detector, in order to fully exploit the highly-demanding operating conditions and the delivered luminosity. The new Tracker should have also trigger capabilities. To achieve such goals, R\\&D activities are ongoing to explore options and develop solutions that would allow including tracking information at Level-1. The design choices for the CMS pixel and outer tracker upgrades are discussed along with some highlights of the R\\&D activities and expected detector performance.

  15. ECE Imaging Bandwidth Upgrade for TEXTOR

    Science.gov (United States)

    Domier, C. W.; Zhang, P.; Luhmann, N. C., Jr.; Park, H. K.; van de Pol, M. J.; Spakman, G. W.; Jaspers, R.; Donne, A. J. H.

    2007-11-01

    The 128 channel 2-D Electron Cyclotron Emission (ECE) Imaging system collects time-resolved 16x8 images of electron temperature profiles and fluctuations on the TEXTOR tokamak. This instrument was upgraded in February 2007 with new wideband ECE electronics which increased the instantaneous frequency coverage by >50% to 6.4 GHz with a corresponding increase in horizontal plasma coverage. Frequency extenders have been developed to combine modules together to double the instantaneous coverage to 12.8 GHz. Technical details regarding both the electronics upgrade and the frequency extenders as well as the preliminary physics results will be presented. Implementation of a similar but new ECEI instrument on the DIII-D tokamak will be extensively discussed.

  16. Biorefining compounds and organocatalytic upgrading methods

    Science.gov (United States)

    Chen, Eugene Y.; Liu, Dajiang

    2016-10-18

    The invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate into 5,5'-di(hydroxymethyl)furoin (DHMF). While many efficient catalyst systems have been developed for conversion of plant biomass resources into HMF, the invention now provides methods to convert such nonfood biomass directly into DHMF by a simple process as described herein. The invention also provides highly effective new methods for upgrading other biomass furaldehydes and related compound to liquid fuels. The methods include the organocatalytic self-condensation (umpolung) of biomass furaldehydes into (C.sub.8-C.sub.12)furoin intermediates, followed by hydrogenation, etherification or esterification into oxygenated biodiesel, or hydrodeoxygenation by metal-acid tandem catalysis into premium hydrocarbon fuels.

  17. Biorefining compounds and organocatalytic upgrading methods

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Eugene Y.; Liu, Dajiang

    2016-10-18

    The invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate into 5,5'-di(hydroxymethyl)furoin (DHMF). While many efficient catalyst systems have been developed for conversion of plant biomass resources into HMF, the invention now provides methods to convert such nonfood biomass directly into DHMF by a simple process as described herein. The invention also provides highly effective new methods for upgrading other biomass furaldehydes and related compound to liquid fuels. The methods include the organocatalytic self-condensation (umpolung) of biomass furaldehydes into (C.sub.8-C.sub.12)furoin intermediates, followed by hydrogenation, etherification or esterification into oxygenated biodiesel, or hydrodeoxygenation by metal-acid tandem catalysis into premium hydrocarbon fuels.

  18. ALFA detector upgrade before LHC Run 2

    CERN Document Server

    Vorobel, Vit; The ATLAS collaboration

    2016-01-01

    The operation experience with ATLAS ALFA detectors in the LHC environment during the Run1 period has shown significant beam-induced heating. Subsequent comprehensive studies revealed that heating effects could be disastrous in the case of the larger beam intensities foreseen for higher luminosities in the LHC Run2. During the first LHC long shutdown (LS1) all ALFA detectors have been removed from the LHC tunnel and their covers - Roman Pots - underwent a geometry upgrade to minimize the impedance losses. It will be shown that this modification together with a system improving the internal heat transfer and an air cooling system, significantly shifted the temperatures of ALFA detectors away from the critical limits throughout the LHC Run2. Also ALFA trigger system was considerably upgraded to keep measured data safely inside the Run2 ATLAS latency budget and to minimize dead time. The needed hardware changes of the trigger system will be presented in the second part of the talk.

  19. Upgrade of ATLAS ITk Pixel Detector

    CERN Document Server

    Huegging, Fabian; The ATLAS collaboration

    2017-01-01

    The high luminosity upgrade of the LHC (HL-LHC) in 2026 will provide new challenges to the ATLAS tracker. The current inner detector will be replaced with an entirely-silicon inner tracker (ITk) which will consist of a five barrel layer Pixel detector surrounded by a four barrel layer Strip detector. The expected high radiation levels are requiring the development of upgraded silicon sensors as well as new a front-end chip. The dense tracking environment will require finer granularity detectors and low mass global and local support structures. The data rates will require new technologies for high bandwidth data transmission and handling. The current status of the ITk ATLAS Pixel detector developments as well as different layout options will be reviewed.

  20. An Upgrade Proposal from the PHENIX Collaboration

    CERN Document Server

    Adare, A; Aidala, C; Ajitanand, N N; Akiba, Y; Akimoto, R; Alexander, J; Aoki, K; Apadula, N; Asano, H; Atomssa, E T; Awes, T C; Azmoun, B; Babintsev, V; Bai, M; Bai, X; Bandara, N; Bannier, B; Barish, K N; Baron, O; Bassalleck, B; Bathe, S; Baublis, V; Baumgart, S; Bazilevsky, A; Beaumier, M; Beckman, S; Belmont, R; Benjamin, G; Berdnikov, A; Berdnikov, Y; Blackburn, J; Blau, D S; Bobrek, M; Bok, J; Boose, S; Boyle, K; Britton,, C L; Brooks, M L; Bryslawskyj, J; Bumazhnov, V; Butler, C; Butsyk, S; Campbell, S; Carollo, A; Chai, J -S; Chen, C -H; Chernichenko, S; Chi, C Y; Chiu, M; Choi, I J; Choi, J B; Choi, S; Chollet, S; Christiansen, P; Chujo, T; Cianciolo, V; Citron, Z; Cole, B A; Cronin, N; Crossett, N; Csanád, M; D'Orazio, L; Dairaku, S; Danley, D; Datta, A; Daugherity, M S; David, G; DeBlasio, K; Debraine, A; Dehmelt, K; Denisov, A; Deshpande, A; Desmond, E J; Dietzsch, O; Ding, L; Dion, A; Diss, P B; Do, J H; Donadelli, M; Drapier, O; Drees, A; Drees, K A; Durham, J M; Durum, A; Eberle, L; Efremenko, Y V; Engelmore, T; Enokizono, A; Esumi, S; Eyser, K O; Fadem, B; Feege, N; Fields, D E; Finger, M; FingerJr., M; Fleuret, F; Fokin, S L; Frantz, J E; Franz, A; Frawley, A D; Fukao, Y; Fusayasu, T; Gainey, K; Gal, C; Gallus, P; Garg, P; Garishvili, A; Garishvili, I; Gastaldi, F; Ge, H; Giannotti, P; Giordarno, F; Glenn, A; Gong, X; Gonin, M; Goto, Y; de Cassagnac, R Granier; Grau, N; Greene, S V; Perdekamp, M Grosse; Gu, Y; Gunji, T; Guragain, H; Hachiya, T; Haggerty, J S; Hahn, K I; Hamagaki, H; Hamilton, H F; Han, S Y; Hanks, J; Hasegawa, S; Haseler, T O S; Hashimoto, K; Hayano, R; Hayashi, S; He, X; Hemmick, T K; Hester, T; Hill, J C; Hoefferkamp, M; Hollis, R S; Homma, K; Hong, B; Hori, Y; Hoshino, T; Huang, J; Huang, S; Hutchins, J R; Ichihara, T; Ikeda, Y; Imai, K; Imazu, Y; Imrek, J; Inaba, M; Iordanova, A; Isenhower, D; Isinhue, A; Isupov, A; Ivanischev, D; Ivanov, V; Jacak, B V; Jeon, S J; Jezghani, M; Jia, J; Jiang, X; Johnson, B M; Joo, K S; Jouan, D; Jumper, D S; Kamin, J; Kanda, S; Kang, B H; Kang, J H; Kang, J S; Kapustinsky, J; Karatsu, K; Kawall, D; Kazantsev, A V; Kehayias, H -J; Key, J A; Khachatryan, V; Khandai, P K; Khanzadeev, A; Kijima, K M; Kim, C; Kim, D H; Kim, D J; Kim, E -J; Kim, H J; Kim, K -B; Kim, M; Kim, Y -J; Kim, Y K; Kimelman, B; Kiss, Á; Kistenev, E; Kitamura, R; Klatsky, J; Kleinjan, D; Kline, P; Koblesky, T; Kochenda, L; Kofarago, M; Komatsu, Y; Komkov, B; Koster, J; Kotchetkov, D; Kotov, D; Kravtsov, P; Krizek, F; Kurita, K; Kuriyama, M; Kurosawa, M; Kwon, Y; Lacey, R; Lai, Y S; Lajoie, J G; Lebedev, A; Lee, G H; Lee, J; Lee, K B; Lee, K S; Lee, S; Lee, S H; Lefferts, R; Leitch, M J; Leite, M A L; Leitgab, M; Lewis, B; Li, X; Lim, S H; Lipski, A; Litvinenko, A; Liu, M X; Love, B; Lynch, D; Lynch, M; Maguire, C F; Makdisi, Y I; Makek, M; Malakhov, A; Manion, A; Manko, V I; Mannel, E; Maruyama, T; Masumoto, S; McCumber, M; McGaughey, P L; McGlinchey, D; McKay, R; McKinney, C; Meles, A; Mendoza, M; Menegasso, R; Meredith, B; Miake, Y; Mibe, T; Mignerey, A C; Milov, A; Mishra, D K; Mitchell, J T; Miyasaka, S; Mizuno, S; Mohanty, A K; Montuenga, P; Moon, T; Morrison, D P; Moskowitz, M; Motschwiller, S; Moukhanova, T V; Murakami, T; Murata, J; Mwai, A; Nagae, T; Nagamiya, S; Nagashima, K; Nagle, J L; Nagy, M I; Nakagawa, I; Nakagomi, H; Nakamiya, Y; Nakamura, K R; Nakamura, T; Nakano, K; Nattrass, C; Nederlof, A; Netrakanti, P K; Nihashi, M; Niida, T; Ninomiya, K; Nishimura, S; Northacker, D; Nouicer, R; Novak, T; Novitzky, N; Nukariya, A; Nyanin, A S; O'Brien, E; Ogilvie, C A; Oide, H; Okada, K; Koop, J D Orjuela; Osborn, J D; Oskarsson, A; Österman, L; Ozawa, K; Pancake, C; Pantuev, V; Papavassiliou, V; Park, I H; Park, J S; Park, S; Park, S K; Pate, S F; Patel, L; Patel, M; Peng, J -C; Perepelitsa, D; Perera, G D N; Peresedov, V; Peressounko, D Yu; Perry, J; Petti, R; Pinkenburg, C; Pinson, R; Pisani, R P; Popule, J; Purschke, M L; Qu, H; Radhakrishnan, S; Rak, J; Ramson, B J; Ravinovich, I; Read, K F; Reynolds, D; Reynolds, R; Riabov, V; Riabov, Y; Richardson, E; Rinn, T; Riveli, N; Roach, D; Rolnick, S D; Rosati, M; Roschin, E; Rowan, Z; Rubin, J G; Rukoyatkin, P; Ryu, M S; Safonov, A; Sahlmueller, B; Saito, N; Sakaguchi, T; Sako, H; Samsonov, V; Sano, M; Sarsour, M; Sato, S; Sawada, S; Schaefer, B; Schmoll, B K; Sedgwick, K; Seele, J; Seidl, R; Sekiguchi, Y; Sen, A; Seto, R; Sett, P; Sexton, A; Shafto, E; Sharma, D; Shaver, A; Shein, I; Shibata, T -A; Shigaki, K; Shimomura, M; Shoji, K; Shukla, P; Sicho, P; Sickles, A; Silva, C L; Silvermyr, D; Singh, B K; Singh, C P; Singh, V; Sippach, F W; Skolnik, M; Snowball, M; Solano, S; Soldatov, A; Soltz, R A; Sondheim, W E; Sorensen, S P; Soumya, M; Sourikova, I V; Stankus, P W; Steinberg, P; Stenlund, E; Stepanov, M; Ster, A; Stevens, L; Stoll, S P; Stone, M R; Sugitate, T; Sukhanov, A; Sumita, T; Sun, J; Sziklai, J; Takagui, E M

    2015-01-01

    In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

  1. LHCb: Upgrade of the LHCb calorimeter electronics

    CERN Multimedia

    Mauricio Ferre, J

    2013-01-01

    The LHCb collaboration foresees a major upgrade of the detector for the high luminosity run that should take place after 2018. Apart from the increase of the instantaneous luminosity at the interaction point of the experiment, one of the major ingredients of this upgrade is a full readout at 40MHz of the sub-detectors and the acquisition of the data by a large farm of PC. The trigger will be done by this farm and should increase the overall trigger efficiency with respect to the current detector, especially in hadronic B meson decays. A general overview of the modifications foreseen to the calorimeter system and the integration of the electromagnetic and hadronic calorimeters in this new scheme will be described.

  2. Social Upgrading in Developing Country Industrial Clusters

    DEFF Research Database (Denmark)

    Pyke, Frank; Lund-Thomsen, Peter

    2016-01-01

    In this article, we examine the role of social upgrading in developing country industrial clusters. We argue that while economic growth and productivity enhancement matter, social conditions within clusters are influenced by state monetary, fiscal, and labour policies and regulations, as well...... as by dynamic processes of agency among cluster governance actors. We find that the state's policies and regulations might enable or constrain cluster actors to behave in ways that affect social upgrading or downgrading. These policies and regulations may also be used by the state to directly change social...... conditions in national contexts, including in cluster settings, in order to further the government's overall economic strategy. The conclusion outlines our main findings, and the research and policy implications of our analysis....

  3. Primary Vertex Reconstruction for Upgrade at LHCb

    CERN Document Server

    Wanczyk, Joanna

    2016-01-01

    The aim of the LHCb experiment is the study of beauty and charm hadron decays with the main focus on CP violating phenomena and searches for physics beyond the Standard Model through rare decays. At the present, the second data taking period is ongoing, which is called Run II. After 2018 during the long shutdown, the replacement of signicant parts of the LHCb detector is planned. One of main changes is upgrade of the present software and hardware trigger to a more rapid full software trigger. Primary Vertex (PV) is a basis for the further tracking and it is sensitive to the LHC running conditions, which are going to change for the Upgrade. In particular, the center-of-mass collision energy should reach the maximum value of 14 TeV. As a result the quality of the reconstruction has to be studied and the reconstruction algorithms have to be optimized.

  4. Enhancement of the Logistics Battle Command Model: Architecture Upgrades and Attrition Module Development

    Science.gov (United States)

    2017-01-05

    DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. TRAC-M-TM-17-010 January 2017 Enhancement of the Logistics ...17-010 January 2017 Enhancement of the Logistics Battle Command Model Architecture Upgrades and Attrition Module Development Nathan Parker... cost the Department of Defense approximately $191,000 expended by TRAC in Fiscal Years 15-17. Prepared on 20170106 TRAC Project Code # 060119 iii

  5. SCAMPI Upgrade Team: Scoping and Sampling in SCAMPI Version 1.3

    Science.gov (United States)

    2016-06-07

    2010 Carnegie Mellon University SCAMPI Upgrade Team: Scoping and Sampling in SCAMPI Version 1.3 Software Engineering Institute Carnegie Mellon...PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Carnegie Mellon University , Software ... University Pittsburgh, PA 15213 Webinar - May 25, 2010 Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the

  6. Kicker pulsers for recycler NOVA upgrades

    CERN Document Server

    Jensen, Chris C

    2015-01-01

    An upgrade of the Recycler injection kicker system required a faster rise time pulser. This system required a field rise and fall time of < 57 ns and a field flattop of 1.6 {\\mu}s. This paper describes the variety of improvements made over the years that have resulted in this latest thyratron pulser. The effects of the trigger, the reservoir and the load impedance on delay and rise time will be discussed.

  7. Upgrading the dosimetry at Ontario Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Hirning, C.R. [Ontario Hydro, Whitby, ON (Canada). Health Physics Dept.

    1996-12-01

    Ontario Hydro has embarked upon a major programme to replace and upgrade its external dosimetry systems. In two year`s time, the utility expects to have two state-of-the-art dosimetry systems in place: a new TLD dosimetry of legal record that was designed nearly 30 years ago; and an electronic dosimetry system which could eventually replace the TLD as the primary system. (Author).

  8. LHCb upgraded Muon System performance studies

    CERN Document Server

    Cogoni, V

    2016-01-01

    After the second Long Shutdown of the LHC scheduled for 2018–2020, LHCb will operate at an istantaneous luminosity of 2 · 10$^{33}$ cm$^{−2}$s$^{−1}$ and at a centre-of-mass energy of 14TeV. An overview of the LHCb Muon System Monte Carlo-based performance studies in upgrade conditions is presented.

  9. Upgrading hydro-electric generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    Coulson, D.M.; Villalon, M.

    1987-11-01

    Approximately 1,720,000 kW of installed hydro-electric generating capacity is either owned directly by pulp and paper companies in Canada or is operated principally in their service. The 216 units involved were commissioned between 1902 and 1982. This paper suggests an approach to upgrading the generating units themselves as well as the related electrical and mechanical equipment and civil structures, giving approximate durations and costs. A complete system study is recommended. 2 refs., 2 figs., 3 tabs.

  10. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F

    2015-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (P hase - II ) where the pea k luminosity will increase 5 times compared to the design luminosity (10 34 cm −2 s −1 ) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity levelling. This upgrade is expe cted to happen around 202 4 . The TileCal upgrade aims at replacing the majority of the on - and off - detector electronics to the extent that all calorimeter signals will be digitized and sent to the off - detector electronics in the counting room. To achieve th e required reliability, redundancy has been introduced at different levels. Three different options are presently being investiga...

  11. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Souza, J; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5-fold compared to the design luminosity (10exp34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2023. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. The smallest independent on-detector electronics module has been reduced from 45 channels to 6, greatly reducing the consequences of a failure in the on-detector electronics. The size of t...

  12. The APS control system network upgrade.

    Energy Technology Data Exchange (ETDEWEB)

    Sidorowicz, K. v.; Leibfritz, D.; McDowell, W. P.

    1999-10-22

    When it was installed,the Advanced Photon Source (APS) control system network was at the state-of-the-art. Different aspects of the system have been reported at previous meetings [1,2]. As loads on the controls network have increased due to newer and faster workstations and front-end computers, we have found performance of the system declining and have implemented an upgraded network. There have been dramatic advances in networking hardware in the last several years. The upgraded APS controls network replaces the original FDDI backbone and shared Ethernet hubs with redundant gigabit uplinks and fully switched 10/100 Ethernet switches with backplane fabrics in excess of 20 Gbits/s (Gbps). The central collapsed backbone FDDI concentrator has been replaced with a Gigabit Ethernet switch with greater than 30 Gbps backplane fabric. Full redundancy of the system has been maintained. This paper will discuss this upgrade and include performance data and performance comparisons with the original network.

  13. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Reed, Robert; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the main hadronic calorimeter covering the central region of the ATLAS experiment at LHC. TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC operation (Phase 2 around 2023) where the peak luminosity will increase 5x compared to the design luminosity (10^{34} cm^{-2}s^{-1}) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims to replace the majority of the on- and off-detector electronics so that all calorimeter signals can be digitized and directly sent to the off-detector electronics in the counting room. This will reduce pile-up problems and allow more complex trigger algorithms. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to t...

  14. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase 2) where the peak luminosity will increase 5$\\times$ compared to the design luminosity ($10^{34} cm^{-2}s^{-1}$) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to the counting room while 5 Gbps down-links are used for synchronization, c...

  15. LHCb; DAQ Architecture for the LHCb Upgrade

    CERN Multimedia

    Neufeld, N

    2013-01-01

    LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run at a high luminosity of 2x 10$^{33}$ cm$^{-2}$ . s$^{-1}$. The upgraded detector will be read out at 40 MHz with a highly flexible software-based triggering strategy. The Data Acquisition (DAQ) system of HCb reads out the data fragments from the Front-End Electronics and transports them to the High-Lever Trigger farm at an aggregate throughput of 32 Tbit/s. The DAQ system will be based on high speed network technologies such as InfiniBand and/or 10/40/100 Gigabit Ethernet. Independent of the network technology, there are different possible architectures for the DAQ system. In this paper, we present our studies on the DAQ architecture, where we analyze size, complexity and (relative) cost. We evaluate and compare several data-flow schemes for a network-based DAQ: push, pull and push with barrel-shifter traffic shaping. We also discuss the requirements and overall implications of the data-flow schemes on the DAQ ...

  16. Geotechnical assessments of upgrading power transmission lines

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Andrew [Coffey Geotechnics Ltd., Harrogate (United Kingdom)

    2012-11-01

    One of the consequences of increasing demand for energy is a corresponding requirement for increased energy distribution. This trend is likely to be magnified by the current tendency to generate power in locations remote from centres of population. New power transmission routes are expensive and awkward to develop, and there are therefore benefits to be gained by upgrading existing routes. However, this in turn raises problems of a different nature. The re-use of any structure must necessarily imply the acceptance of unknowns. The upgrading of transmission lines is no exception to this, particularly when assessing foundations, which in their nature are not visible. A risk-based approach is therefore used. This paper describes some of the geotechnical aspects of the assessment of electric power transmission lines for upgrading. It briefly describes the background, then discusses some of the problems encountered and the methods used to address them. These methods are based mainly on information obtained from desk studies and walkover surveys, with a limited amount of intrusive investigation. (orig.)

  17. DAQ Architecture for the LHCb Upgrade

    Science.gov (United States)

    Liu, Guoming; Neufeld, Niko

    2014-06-01

    LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run at a high luminosity of 2 × 1033 cm-2s-1. The upgraded detector will be read out at 40 MHz with a highly flexible software-based triggering strategy. The Data Acquisition (DAQ) system of LHCb reads out the data fragments from the Front-End Electronics and transports them to the High-Lever Trigger farm at an aggregate throughput of ~ 32 Tbit/s. The DAQ system will be based on high speed network technologies such as InfiniBand and/or 10/40/100 Gigabit Ethernet. Independent of the network technology, there are different possible architectures for the DAQ system. In this paper, we present our studies on the DAQ architecture, where we analyze size, complexity and relative cost. We evaluate and compare several data-flow schemes for a network-based DAQ: push, pull and push with barrel-shifter traffic shaping. We also discuss the requirements and overall implications of the data-flow schemes on the DAQ system.

  18. Upgrades of the ATLAS Pixel Detector

    CERN Document Server

    Hügging, F; The ATLAS collaboration

    2013-01-01

    The upgrade for the ATLAS detector will undergo different phases towards HL-LHC. The first upgrade for the Pixel Detector (Phase 1) consists in the construction of a new pixel layer, which will be installed during the 1st long shutdown of the LHC machine (LS1) in 2013/14. The new detector, called Insertable B-Layer (IBL), will be inserted between the existing pixel detector and a new (smaller radius) beam-pipe at a radius of about 3.2 cm. The IBL requires the development of several new technologies to cope with the increase of radiation and pixel occupancy as well as to improve the physics performance of the existing pixel detector. The pixel size is reduced and the material budget is minimized by using new lightweight mechanical support materials and a CO2 based cooling system. For Phase 2 upgrade of LHC a complete new 4-layer pixel system is planned as part of a new all silicon Inner Detector. The increase in luminosity to about $5\\cdot 10^{34}$cm$^{-2}$s$^{-1}$ together with a total expected lifetime of ab...

  19. FDI and industrial upgrade of Albania

    Directory of Open Access Journals (Sweden)

    Aurel Koroci

    2017-03-01

    Full Text Available Foreign direct investment (FDI in developing countries brings economic development and enhances the international competitiveness of domestic enterprises. The entrance of FDI would normally be considered as a prerequisite for the success of the introduction of foreign capital. FDI accounts for the largest and most important proportion of foreign capital in Albania, which undoubtedly plays an important role in the Albania's economic development growth and country. However, as the country continues to taking various preferential policies to promote foreign investment and the good momentum of Albania's economic development, FDI increases, and in this paper we want to evaluate how the FDI has influenced the technological progress of the country. In general, multinational companies have advantages of capital, technology or management-intensive elements, if there is no foreign direct investment, for the host country producing new industries or upgrading of the structure of traditional industries shall be more difficult. The promoted technological progress and management level can lead labor force, labor tools to have productivity growth and can lead directly to changes in the structure of industrial technology. FDI inflows give the "package" of resources, technology and management skills needed not only to help the host country to establish new industries, but also to help host country to promote inter-industry structure within a structural optimization and industrial upgrading. Based on the theory of FDI, this paper through a theoretical analysis and an analysis on data on country's data reaches conclusion that FDI has positive eff ects on industrial upgrade in Albania.

  20. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Jeitler, Manfred; Rabady, Dinyar; Sakulin, Hannes; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run-II of the Large Hadron Collider poses new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run-I, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new μTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (μGMT) which sorts and removes duplicates from boundaries of the muon trigger sub-systems. Furthermore, it determines how isolated the muon candidates are based on calorimetric energy deposits. The μGMT will be implemented using a processing board that features a larg...

  1. GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING

    Energy Technology Data Exchange (ETDEWEB)

    Howard S. Meyer

    2003-10-01

    Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbing liquid. These resilient membranes provide much greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting in equipment 50-70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. Kvaerner and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project. Efforts this quarter have concentrated on field site selection. ChevronTexaco has nominated their Headlee Gas Plant in Odessa, TX for a commercial-scale dehydration test. Design and cost estimation for this new site are underway. A Haz

  2. I{sup Y}Q upgrading at a 1 bbl/d scale

    Energy Technology Data Exchange (ETDEWEB)

    Brown, W. [ETX Systems, Calgary, AB (Canada)

    2009-07-01

    The complex relationships between the many chemical and physical processes involved in heavy oil thermal upgrading have inhibited technology development in heavy oil because these underlying processes have been difficult to quantify. This paper presented a model which provides focus for the development of new upgrading technology. It is based on the understanding that product yields and qualities are influenced by the balance between mass transfer and reaction kinetics. ETX Systems developed the I{sup Y}Q upgrading technology which exceeds benchmarks in terms of liquid yields, product qualities and economics. The attributes of the technology result in a smaller environmental footprint associated with heavy oil development. A pilot plant has been built at a 1 bbl/day scale. The fluidized bed process complete with circulation of hot solids was commissioned in the fall of 2007. The unit has since provided field support for the original yield and quality claims assigned to the I{sup Y}Q upgrading technology. The results have exceeded original expectations. ETX Systems has also launched a project to prove commercial operability at a scale of 2000 bbl/day. This presentation focused on the challenges faced during the pilot exercise. The results have shown the advantage of lowering operating temperatures with respect to both yield and quality. tabs., figs.

  3. Physics Program for the STAR/CBM eTOF Upgrade

    CERN Document Server

    ,

    2016-01-01

    The STAR Collaboration and the CBM Collaboration institutions: Heidelberg, Darmstadt, CCNU, Tsinghua, and USTC propose to install an end-cap time-of-flight upgrade (eTOF) to the STAR detector for the RHIC beam energy scan phase II (BES-II) program in 2019 and 2020. BES-II will cover the collision energy range 3.0 to 19.6 GeV. This is the region of interest in the search for a critical point and first-order phase transition, identified by the results from BES-I and by model calculations. For the collider-mode portion of the energy scan, 7.7 to 19.6 GeV, eTOF will extend particle identification (PID) for pions, kaons, and protons to a rapidity of 1.2, complementing the inner Time Projection Chamber (iTPC) upgrade to the forward tracking. The rapidity coverage for PID would extend to only 0.8 without the eTOF upgrade. The eTOF upgrade will enable precision studies of the key bulk property observables, essential to the BES-II search. An internal fixed-target program will allow the energy scan to cover 3.0 to 7.7 ...

  4. ATLAS Upgrades Towards the High Luminosity LHC: Extending the Discovery Potential

    CERN Document Server

    Vankov, P; The ATLAS collaboration

    2013-01-01

    After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data a...

  5. ATLAS Upgrades Towards the High Luminosity LHC: extending the discovery potential

    CERN Document Server

    Valero, A; The ATLAS collaboration

    2013-01-01

    After successful LHC operation at the center-of-mass energy of 7 and 8TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the data set from about few hundred fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data acquisi...

  6. ATLAS Upgrades Towards the High Luminosity LHC: extending the discovery potential

    CERN Document Server

    Loginov, A; The ATLAS collaboration

    2012-01-01

    After successful LHC operation at the center-of-mass energy of 7 TeV in 2011, the LHC is scheduled to deliver even more data in 2012 at 8 TeV. Meanwhile, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about 300 fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon...

  7. ATLAS Upgrade Towards the High-Luminosity LHC: Extending the Discovery Potential

    CERN Document Server

    Gregor, IM; The ATLAS collaboration

    2013-01-01

    After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data acqui...

  8. ATLAS Upgrades Towards the High Luminosity LHC:extending the discovery potential

    CERN Document Server

    Vankov, P; The ATLAS collaboration

    2013-01-01

    After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data a...

  9. ATLAS Upgrades Towards the High Luminosity LHC: extending the discovery potential

    CERN Document Server

    Valero, A; The ATLAS collaboration

    2014-01-01

    After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, cul- minating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous lumi- nosity along with luminosity leveling. The final goal is to extend the data set from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and inte- grated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and d...

  10. ATLAS Upgrades Towards the High Luminosity LHC: extending the discovery potential

    CERN Document Server

    Parzefall, U; The ATLAS collaboration

    2012-01-01

    After successful LHC operation at the center-of-mass energy of 7 TeV in 2011, the LHC is scheduled to deliver even more data in 2012 at 8 TeV. Meanwhile, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about 300fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon ...

  11. ATLAS Upgrades Towards the High Luminosity LHC: extending the discovery potential

    CERN Document Server

    Cinca, D; The ATLAS collaboration

    2014-01-01

    After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data acqui...

  12. The sROD Module for the ATLAS Tile Calorimeter Phase-II Upgrade Demonstrator

    CERN Document Server

    Carrio, F; Ferrer, A; Fiorini, L; Hernandez, Y; Higon, E; Mellado, B; March, L; Moreno, P; Reed, R; Solans, C; Valero, A; Valls, J A

    2014-01-01

    TileCal is the central hadronic calorimeter of the ATLAS experiment at the Large Hadron Collider (LHC) at CERN. The main upgrade of the LHC to increase the instantaneous luminosity is scheduled for 2022. The High Luminosity LHC, also called upgrade Phase-II, will imply a complete redesign of the read-out electronics in TileCal. In the new read-out architecture, the front-end electronics aims to transmit full digitized information to the back-end system in the counting rooms. Thus, the back-end system will provide digital calibrated information with en- hanced precision and granularity to the first level trigger to improve the trigger efficiencies. The demonstrator project is envisaged to qualify this new proposed architecture. A reduced part of the detector, 1/256 of the total, will be upgraded with the new electronics during 2014 to evaluate the proposed architecture in real conditions. The upgraded Read-Out Driver (sROD) will be the core element of the back-end electronics in Phase-II The sROD module is des...

  13. On optimal strategies for upgrading networks

    Energy Technology Data Exchange (ETDEWEB)

    Krumke, S.O.; Noltemeier, H. [Wuerzburg Univ. (Germany). Dept. of Computer Science; Marathe, M.V. [Los Alamos National Lab., NM (United States); Ravi, S.S. [State Univ. of New York, Albany, NY (United States). Dept. of Computer Science; Ravi, R. [Carnegie-Mellon Univ., Pittsburgh, PA (United States). Graduate School of Industrial Administration; Sundaram, R. [Massachusetts Inst. of Tech., Cambridge, MA (United States)

    1996-07-02

    We study {ital budget constrained optimal network upgrading problems}. Such problems aim at finding optimal strategies for improving a network under some cost measure subject to certain budget constraints. Given an edge weighted graph {ital G(V,E)}, in the {ital edge based upgrading model}, it is assumed that each edge {ital e} of the given network has an associated function {ital c(e)} that specifies for each edge {ital e} the amount by which the length {ital l(e)} is to be reduced. In the {ital node based upgrading model} a node {ital v} can be upgraded at an expense of cost {ital (v)}. Such an upgrade reduces the cost of each edge incident on {ital v} by a fixed factor {rho}, where 0 < {rho} < 1. For a given budget, {ital B}, the goal is to find an improvement strategy such that the total cost of reduction is a most the given budget {ital B} and the cost of a subgraph (e.g. minimum spanning tree) under the modified edge lengths is the best over all possible strategies which obey the budget constraint. Define an ({alpha},{beta})-approximation algorithm as a polynomial-time algorithm that produces a solution within {alpha} times the optimal function value, violating the budget constraint by a factor of at most {Beta}. The results obtained in this paper include the following 1. We show that in general the problem of computing optimal reduction strategy for modifying the network as above is {bold NP}-hard. 2. In the node based model, we show how to devise a near optimal strategy for improving the bottleneck spanning tree. The algorithms have a performance guarantee of (2 ln {ital n}, 1). 3. for the edge based improvement problems we present improved (in terms of performance and time) approximation algorithms. 4. We also present pseudo-polynomial time algorithms (extendible to polynomial time approximation schemes) for a number of edge/node based improvement problems when restricted to the class of treewidth-bounded graphs.

  14. Panoramic projection avionics displays

    Science.gov (United States)

    Kalmanash, Michael H.

    2003-09-01

    Avionics projection displays are entering production in advanced tactical aircraft. Early adopters of this technology in the avionics community used projection displays to replace or upgrade earlier units incorporating direct-view CRT or AMLCD devices. Typical motivation for these upgrades were the alleviation of performance, cost and display device availability concerns. In these systems, the upgraded (projection) displays were one-for-one form / fit replacements for the earlier units. As projection technology has matured, this situation has begun to evolve. The Lockheed-Martin F-35 is the first program in which the cockpit has been specifically designed to take advantage of one of the more unique capabilities of rear projection display technology, namely the ability to replace multiple small screens with a single large conformal viewing surface in the form of a panoramic display. Other programs are expected to follow, since the panoramic formats enable increased mission effectiveness, reduced cost and greater information transfer to the pilot. Some of the advantages and technical challenges associated with panoramic projection displays for avionics applications are described below.

  15. Overview of NSTX Upgrade initial results and modelling highlights

    Science.gov (United States)

    Menard, J. E.; Allain, J. P.; Battaglia, D. J.; Bedoya, F.; Bell, R. E.; Belova, E.; Berkery, J. W.; Boyer, M. D.; Crocker, N.; Diallo, A.; Ebrahimi, F.; Ferraro, N.; Fredrickson, E.; Frerichs, H.; Gerhardt, S.; Gorelenkov, N.; Guttenfelder, W.; Heidbrink, W.; Kaita, R.; Kaye, S. M.; Kriete, D. M.; Kubota, S.; LeBlanc, B. P.; Liu, D.; Lunsford, R.; Mueller, D.; Myers, C. E.; Ono, M.; Park, J.-K.; Podesta, M.; Raman, R.; Reinke, M.; Ren, Y.; Sabbagh, S. A.; Schmitz, O.; Scotti, F.; Sechrest, Y.; Skinner, C. H.; Smith, D. R.; Soukhanovskii, V.; Stoltzfus-Dueck, T.; Yuh, H.; Wang, Z.; Waters, I.; Ahn, J.-W.; Andre, R.; Barchfeld, R.; Beiersdorfer, P.; Bertelli, N.; Bhattacharjee, A.; Brennan, D.; Buttery, R.; Capece, A.; Canal, G.; Canik, J.; Chang, C. S.; Darrow, D.; Delgado-Aparicio, L.; Domier, C.; Ethier, S.; Evans, T.; Ferron, J.; Finkenthal, M.; Fonck, R.; Gan, K.; Gates, D.; Goumiri, I.; Gray, T.; Hosea, J.; Humphreys, D.; Jarboe, T.; Jardin, S.; Jaworski, M. A.; Koel, B.; Kolemen, E.; Ku, S.; La Haye, R. J.; Levinton, F.; Luhmann, N.; Maingi, R.; Maqueda, R.; McKee, G.; Meier, E.; Myra, J.; Perkins, R.; Poli, F.; Rhodes, T.; Riquezes, J.; Rowley, C.; Russell, D.; Schuster, E.; Stratton, B.; Stutman, D.; Taylor, G.; Tritz, K.; Wang, W.; Wirth, B.; Zweben, S. J.

    2017-10-01

    The National Spherical Torus Experiment (NSTX) has undergone a major upgrade, and the NSTX Upgrade (NSTX-U) Project was completed in the summer of 2015. NSTX-U first plasma was subsequently achieved, diagnostic and control systems have been commissioned, the H-mode accessed, magnetic error fields identified and mitigated, and the first physics research campaign carried out. During ten run weeks of operation, NSTX-U surpassed NSTX record pulse-durations and toroidal fields (TF), and high-performance ~1 MA H-mode plasmas comparable to the best of NSTX have been sustained near and slightly above the n  =  1 no-wall stability limit and with H-mode confinement multiplier H98y,2 above 1. Transport and turbulence studies in L-mode plasmas have identified the coexistence of at least two ion-gyro-scale turbulent micro-instabilities near the same radial location but propagating in opposite (i.e. ion and electron diamagnetic) directions. These modes have the characteristics of ion-temperature gradient and micro-tearing modes, respectively, and the role of these modes in contributing to thermal transport is under active investigation. The new second more tangential neutral beam injection was observed to significantly modify the stability of two types of Alfven eigenmodes. Improvements in offline disruption forecasting were made in the areas of identification of rotating MHD modes and other macroscopic instabilities using the disruption event characterization and forecasting code. Lastly, the materials analysis and particle probe was utilized on NSTX-U for the first time and enabled assessments of the correlation between boronized wall conditions and plasma performance. These and other highlights from the first run campaign of NSTX-U are described.

  16. RANT Building Upgrade Pre-Proposal Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Melinda Ann [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Meadows, Darren W. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Rodriguez, Roger R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); MacFarlane, Eric Robert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Ortega, Adan Eduardo [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Lopez Escobedo, Gabriela Maria [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-07-31

    This presentation is designed to provide an overview of the project scope and RFP; discuss interfaces for the construction project; highlight key expectations and deliverables from the subcontractor; and address questions and provide clarification of the project scope.

  17. Architecture of the upgraded BCM1F Backend Electronics for Beam Conditions and Luminosity measurement - hardware and firmware

    CERN Document Server

    Zagozdzinska, Agnieszka Anna

    2014-01-01

    The Beam Radiation Instrumentation and Luminosity Project of the CMS experiment, consists of several beam monitoring systems. One system, the upgraded Fast Beams Condition Monitor, is based on 24 single crystal CVD diamonds with a double-pad sensor metallization and a custom designed readout. Signals for real time monitoring are transmitted to the counting room, where they are received and processed by new back-end electronics designed to extract information on LHC collision, beam induced background and activation products. The Slow Control Driver is designed for the front-end electronics configuration and control. The system architecture and the upgrade status will be presented.

  18. Development of a methodology for selecting office building upgrading solutions based on a test survey in European buildings

    Energy Technology Data Exchange (ETDEWEB)

    Wittchen, K.B.; Brandt, E. [Danish Building and Urban Research, Horsholm (Denmark)

    2001-07-01

    The potential for using the TOBUS methodology to select office building upgrading solutions have been investigated during field tests in 15 European office buildings in 5 European countries. The 15 office buildings represent a variety of building traditions, architectural designs, construction periods and energy and indoor performance. The buildings were audited following the TOBUS methodology developed within the project. The results of the test surveys were primarily used to improve the TOBUS methodology and secondly to suggest general upgrading solutions and energy retrofit measures for the surveyed buildings. This paper describes the development of the TOBUS methodology based on the 15 test surveys. (author)

  19. GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING

    Energy Technology Data Exchange (ETDEWEB)

    Howard S. Meyer

    2003-07-01

    Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbing liquid. These resilient membranes provide much greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting in equipment 50-70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. Kvaerner and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project. Efforts this quarter have concentrated on field site selection. ChevronTexaco has nominated their Headlee Gas Plant in Odessa, TX for a commercial-scale dehydration test. Design and cost estimation for this new site are underway. Potting

  20. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade is being performed during the Extended Year End Technical Stop of 2016 â?? 2017. In the framework of the upgrade, the PMT boxes are being reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics is also being upgraded to QIE10-based electronics which will implement larger dynamic range and a 6-bit TDC to eliminate the background to have an effect on the trigger. Following this major upgrade, the Hadron Forward Calorimeters will be commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  1. Magnetohydrodynamic projects at the CDIF

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This quarterly technical progress report presents the tasks accomplished at the Component Development and Integration Facility (CDIF) during the second quarter of FY91. Areas of technical progress this quarter included: coal system development; seed system development; test bay modification; channel power dissipation and distribution system development; oxygen system storage upgrade; iron-core magnet thermal protection system checkout; TRW slag rejector/CDIF slag removal project; stack gas/environmental compliance upgrade; coal-fired combustor support; 1A channels fabrication and assembly; support of Mississippi State University diagnostic testing; test operations and results; data analysis and modeling; technical papers; and projected activities. 2 tabs.

  2. Methods and apparatuses for preparing upgraded pyrolysis oil

    Science.gov (United States)

    Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

    2013-10-01

    Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

  3. CMS Hadron Forward Calorimeter Phase I Upgrade Status

    CERN Document Server

    Onel, Yasar

    2015-01-01

    The Hadron Forward Calorimeter of CMS is going through a complete Phase I upgrade. The current photomultiplier tubes (PMTs) are being replaced with thinner window, higher quantum efficiency, four-anode photomultiplier tubes. The new PMTs will provide better light detection performance, a significantly reduced background and unique handles to recover the signal in the presence of background. This report will describe the nature of the essential upgrade elements with supporting beam test results and the status of the upgrade progression.

  4. Physics potential and the status of DOE upgrade at Fermilab

    CERN Document Server

    Jaehoon, Yu

    2001-01-01

    The DOE experiment is one of the two collider experiments at Fermilab. The DOE detector is a multipurpose detector and took its data during Fermilab TeVatron collider run in 1992-1996. Both the DO detector and the Tevatron accelerator at Fermilab are currently undergoing significant upgrade to extend the reach to new physics and to further probe Standard Model. In this paper, physics potential of the upgraded DOE detector and the upgrade status are discussed.

  5. CMS Hadron Forward Calorimeter Phase I Upgrade Status

    CERN Document Server

    Bilki, Burak

    2014-01-01

    The Hadron Forward Calorimeter of CMS is going through a complete Phase I upgrade. The current photomultiplier tubes (PMTs) are being replaced with thinner window, higher quantum efficiency, four-anode photomultiplier tubes. The new PMTs will provide better light detection performance, a significantly reduced background and unique handles to recover the signal in the presence of background. This report will describe the nature of the essential upgrade elements with supporting beam test results and the status of the upgrade progression.

  6. Successful Strategies for Rapidly Upgrading PTC Windchill 9.1 to Windchill 10.1 on a Light Budget

    Science.gov (United States)

    Shearrow, Charles A.

    2013-01-01

    Topics covered include: The Frugal Times Historical Upgrade Process; Planning for Possible Constraints; PTC Compatibility Matrix; In-Place Upgrade Process; Pre-Upgrade Activities; Upgrade Activities; Post Upgrade Activities; Results of the Upgrade; Tips for an Upgrade On a Shoestring Budget.

  7. Trigger tracking for the LHCb upgrade

    CERN Multimedia

    Dungs, K

    2014-01-01

    This poster presents a trigger system for the upgraded LHCb detector, scheduled to begin operation in 2020. The proposed trigger system is implemented entirely in software. We show that track reconstruction of a similar quality to that available in the offline algorithms can be performed on the full inelastic pp-collision rate. A track finding efficiency of 98.8% relative to offline can be achieved for good trigger tracks. The CPU time required for this reconstruction is less than 60% of the available budget.

  8. DA{phi}NE Upgrade Status

    Energy Technology Data Exchange (ETDEWEB)

    Alesini, David; Biagini, Maria Enrica; Biscari, Caterina; Boni, Roberto; Boscolo, Manuela; Bossi, Fabio; Buonomo, Bruno; Clozza, Alberto; Delle Monache, Giovanni; Demma, Theo; Di Pasquale, Enrico; Di Pirro, Giampiero; Drago, Alessandro; Gallo, Alessandro; Ghigo, Andrea; Guiducci, Susanna; Ligi, Carlo; Marcellini, Fabio; Mazzitelli, Giovanni; Milardi, Catia [INFN Laboratori Nazionali di Frascati, Frascati, Rome (Italy)] (and others)

    2008-09-15

    The DA{phi}NE {phi}-factory at INFN-LNF has been upgraded in the second half of 2007 with the scope of testing a recently proposed scheme of crab waist collisions. New vacuum chambers and permanent quadrupole magnets have been designed, fabricated and installed to realize the new configuration. The ring injection systems have been also modified with the installation of new stripline fast injection kickers. Moreover the old bellows have been substituted by the new ones and all ion clearing electrodes in the electron ring have been removed. In the talk we describe the new layout as well as several experimental results obtained during the new run.

  9. Upgrading Longitudinal Beam Behavior In Ihep Booster

    CERN Document Server

    Gurevich, A; Ivanov, S; Lebedev, O; Simonov, A; Sytov, S

    2004-01-01

    Operation of 1.5 GeV fast-cycling Booster proton syn chrotron of IHEP has been long hampered by unwanted oscillations in bunch length. To identify the reason of such beam behavior, a dedicated beam-dynamics research program has been initiated. The scope of this activity has covered a variety of the might-be mechanisms behind-coherent instabilities, malfunction of voltage amplitude feedbacks, quality of the voltage program, etc. Ultimately, phase loop encircling the VCO has been upgraded, which resulted in a noticeably suppressed scale of both, dipole and quadrupole oscillations of beam.

  10. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

    Energy Technology Data Exchange (ETDEWEB)

    Talmadge, M.; Biddy, M.; Dutta, A.; Jones, S.; Meyer, A.

    2013-03-01

    This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

  11. HEAVY OIL UPGRADING WITH MINIMAL INVESTMENT COST

    Institute of Scientific and Technical Information of China (English)

    2000-01-01

    By making best use of the low value by-products and maximum utilization of the existed processing units to minimize the investment cost,several heavy oil upgrading processes have been developed and put into practice in China.For domestic sweet crudes,RFCC combined with decanted oil coking or deasphalting has been selected.By RFCC-coking or deasphalting synergy,inferior quality feedstock can be accepted and needle coke and paving asphalt are produced.For imported sulfur crudes,high vacuum distillation combined with asphalt production and combined coking with the use of coke in cement industry and Fluidized Bed Combustion are recommend.

  12. The Upgrade to Hybrid Incubators in China

    DEFF Research Database (Denmark)

    Hu, Yimei; Gao, Yuchen

    with the integration of the advantages of non-for-profit and for-profit TBIs at same time. However, research on specific paths or key factors for integration of non-for- and for-profit TBIs to be one hybrid incubator are in sufficient. In addition, there are few relevant investigations about incubators in developing...... countries and emerging economics. Based on a single in-depth case-study of Tuspark Incubator, this study explores key factors and specific ways for the upgrade to hybrid incubators in the context of China. By using categorical analysis, three factors, i.e. incubation subdivision, intermediary platform...... TBIs in China requires further study....

  13. Upgrade of the area II spectrograph

    Energy Technology Data Exchange (ETDEWEB)

    Rehm, K.E.; Bolduc, C.

    1995-08-01

    Because of the low beam energies required for experiments of astrophysical interest, the first test experiments with radioactive {sup 18}F beams can be performed in Area II. Because of the shorter distances between ion source and detector this also results in higher transmission efficiencies. The Enge split-pole spectrograph, which was not used during the last 8 years, was equipped with a new cryopump system, upgrades to the magnet power supply and the NMR system were performed. A rotating target system was built which should alleviate target deterioration effects that were observed in first test experiments.

  14. Alaska Seismic Network Upgrade and Expansion

    Science.gov (United States)

    Sandru, J. M.; Hansen, R. A.; Estes, S. A.; Fowler, M.

    2009-12-01

    AEIC (Alaska Earthquake Information Center) has begun the task of upgrading the older regional seismic monitoring sites that have been in place for a number of years. Many of the original sites (some dating to the 1960's) are still single component analog technology. This was a very reasonable and ultra low power reliable system for its day. However with the advanced needs of today's research community, AEIC has begun upgrading to Broadband and Strong Motion Seismometers, 24 bit digitizers and high-speed two-way communications, while still trying to maintain the utmost reliability and maintaining low power consumption. Many sites have been upgraded or will be upgraded from single component to triaxial broad bands and triaxial accerometers. This provided much greater dynamic range over the older antiquated technology. The challenge is compounded by rapidly changing digital technology. Digitizersand data communications based on analog phone lines utilizing 9600 baud modems and RS232 are becoming increasingly difficult to maintain and increasingly expensive compared to current methods that use Ethernet, TCP/IP and UDP connections. Gaining a reliable Internet connection can be as easy as calling up an ISP and having a DSL connection installed or may require installing our own satellite uplink, where other options don't exist. LANs are accomplished with a variety of communications devices such as spread spectrum 900 MHz radios or VHF radios for long troublesome shots. WANs are accomplished with a much wider variety of equipment. Traditional analog phone lines are being used in some instances, however 56K lines are much more desirable. Cellular data links have become a convenient option in semiurban environments where digital cellular coverage is available. Alaska is slightly behind the curve on cellular technology due to its low population density and vast unpopulated areas but has emerged into this new technology in the last few years. Partnerships with organizations

  15. VELO aperture considerations for the LHCb Upgrade

    CERN Document Server

    Appleby, R B; Giovannozzi, M; Holzer, B; Neat, M

    2012-01-01

    In Long Shutdown 2 the VELO detectors will be replaced by new modules compatible with the LHCb Upgrade 40 MHz read-out system. A smaller inner radius of the VELO RF foil and of the silicon sensor active area will allow LHCb to considerably improve the impact parameter resolution. Here, a limit of the minimum VELO aperture during physics (Stable Beams) is discussed. A value of 3.5 mm for the nominal radius of the inner edge fo the RF foil seems acceptable.

  16. Upgrade and yields of the IGISOL facility

    Energy Technology Data Exchange (ETDEWEB)

    Karvonen, P. [Department of Physics, P.O. Box 35 (YFL), University of Jyvaeskylae, FI-40014 (Finland)], E-mail: Pasi.Karvonen@phys.jyu.fi; Penttilae, H.; Aystoe, J. [Department of Physics, P.O. Box 35 (YFL), University of Jyvaeskylae, FI-40014 (Finland); Billowes, J.; Campbell, P. [Schuster Laboratory, University of Manchester, Manchester M13 9PL (United Kingdom); Elomaa, V-V. [Department of Physics, P.O. Box 35 (YFL), University of Jyvaeskylae, FI-40014 (Finland); Hager, U. [Department of Physics, P.O. Box 35 (YFL), University of Jyvaeskylae, FI-40014 (Finland); TRIUMF, 4004 Wesbrook Mall, Vancouver, British Columbia, V6T 2A3 (Canada); Hakala, J.; Jokinen, A.; Kessler, T.; Kankainen, A.; Moore, I.D. [Department of Physics, P.O. Box 35 (YFL), University of Jyvaeskylae, FI-40014 (Finland); Peraejaervi, K. [Department of Physics, P.O. Box 35 (YFL), University of Jyvaeskylae, FI-40014 (Finland); STUK, Radiation and Nuclear Safety Authority, P.O. Box 14, FI-00881 (Finland); Rahaman, S. [Department of Physics, P.O. Box 35 (YFL), University of Jyvaeskylae, FI-40014 (Finland); Rinta-Antila, S. [Department of Physics, P.O. Box 35 (YFL), University of Jyvaeskylae, FI-40014 (Finland); Department of Physics, University of Liverpool, Liverpool L69 7ZE (United Kingdom); Rissanen, J.; Ronkainen, J.; Saastamoinen, A. [Department of Physics, P.O. Box 35 (YFL), University of Jyvaeskylae, FI-40014 (Finland); Sonoda, T. [Department of Physics, P.O. Box 35 (YFL), University of Jyvaeskylae, FI-40014 (Finland); K. U. Leuven, Instituut voor Kern- en Stralingsfysica, University of Leuven, Celestijnenlaan 200D, B-3001 Leuven (Belgium); Tordoff, B. [Department of Physics, P.O. Box 35 (YFL), University of Jyvaeskylae, FI-40014 (Finland); Schuster Laboratory, University of Manchester, Manchester M13 9PL (United Kingdom)] (and others)

    2008-10-15

    The front end of the Jyvaeskylae IGISOL facility was upgraded in 2003 by increasing its pumping capacity and by improving the radiation shielding. In late 2005, the skimmer electrode of the mass separator was replaced by a sextupole ion guide, which improved the mass separator efficiency up to an order of magnitude. The current design of the facility is described. The updated yield data, achieved with and without the additional JYFLTRAP purification, using both fusion evaporation reactions and particle induced fission is presented to give an overview of the capability of the facility. These data have been determined either by radioactivity measurements or by direct ion counting after the Penning trap system.

  17. The BABAR detector: Upgrades, operation and performance

    OpenAIRE

    Barate, R.; Boutigny, D.; Couderc, F; Sanchez, PDA; Gaillard, J-M; Hicheur, A.; Karyotakis, Y; Lees, JP; Poireau, V.; Prudent, X.; Wogsland, BJ; Haller, G.; Hamilton, J.; Hanushevsky, A.; Hasan, A.

    2013-01-01

    This article is the Preprint version of the final published article which can be accessed at the link below. The BaBar detector operated successfully at the PEP-II asymmetric e+e− collider at the SLAC National Accelerator Laboratory from 1999 to 2008. This report covers upgrades, operation, and performance of the collider and the detector systems, as well as the trigger, online and offline computing, and aspects of event reconstruction since the beginning of data taking. This work has b...

  18. MCNPX graphics and arithmetic tally upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Durkee, Joe W [Los Alamos National Laboratory; James, Michael R [Los Alamos National Laboratory; Waters, Laurie S [Los Alamos National Laboratory

    2008-01-01

    The MCNPX MCPLOT package is the tool used to plot tallies and cross-sections. We report on an assortment of upgrades to MCPLOT that are intended to improve the appearance of two-dimensional tally and cross-section plots. We have also expanded the content and versatility of the MCPLOT 'help' command. Finally, we describe the initial phase of capability implementation to post-process tally data using arithmetic operations. These improvements will enable users to better display and manipulate simulation results.

  19. Upgrade of the ALICE inner tracking system

    Science.gov (United States)

    Rossegger, Stefan

    2013-12-01

    The Inner Tracking System (ITS) is the key ALICE detector for the study of heavy flavor production at LHC. Heavy flavor can be studied via the identification of short-lived hadrons containing heavy quarks which have a mean proper decay length in the order of 100-300 μm. To accomplish this task, the ITS is composed of six cylindrical layers of silicon detectors (two pixel, two drift and two strip) with a radial coverage from 3.9 to 43 cm and an average material budget of 1.1% X0 per layer. In order to enhance the ALICE physics capabilities, and, in particular, the tracking performance for heavy-flavor detection, the possibility of an ITS upgrade has been studied in great detail. It will make use of the spectacular progress made in the field of imaging sensors over the last 10 years as well as the possibility to install a smaller radius beampipe. The upgraded detector will have greatly improved features in terms of the impact parameter resolution, standalone tracking efficiency at low pt, momentum resolution and readout capabilities. The usage of the most recent monolithic and/or hybrid pixel detector technologies allows the improvement of the detector material budget and the intrinsic spatial resolution both by a factor of three with respect to the present ITS. The installation of a smaller beam-pipe reduces the distance between the first detector layer and the interaction vertex. Under these assumptions, simulations show that an overall improvement of the impact parameter resolution by a factor of three is possible. The Conceptual Design Report for the Upgrade of the ALICE ITS, which covers the design and performance requirements, the upgrade options, as well as the necessary R&D efforts, was made public in September 2012. An intensive R&D program has been launched to review the different technological options under consideration. The new detector should be ready to be installed during the long LHC shutdown period scheduled in 2017-2018.

  20. Silicon Sensors for the Upgrades of the CMS Pixel Detector

    CERN Document Server

    Centis Vignali, Matteo; Schleper, Peter

    2015-01-01

    The Compact Muon Solenoid (CMS) is a general purpose detector at the Large Hadron Collider (LHC). The LHC luminosity is constantly increased through upgrades of the accel- erator and its injection chain. Two major upgrades will take place in the next years. The rst upgrade involves the LHC injector chain and allows the collider to achieve a luminosity of about 2 10 34 cm-2 s-1 A further upgrade of the LHC foreseen for 2025 will boost its luminosity to 5 10 34 cm-2 s1. As a consequence of the increased luminosity, the detectors need to be upgraded. In particular, the CMS pixel detector will undergo two upgrades in the next years. The rst upgrade (phase I) consists in the substitution of the current pixel detector in winter 2016/2017. The upgraded pixel detector will implement new readout elec- tronics that allow ecient data taking up to a luminosity of 2 10 34 cm-2s-1,twice as much as the LHC design luminosity. The modules that will constitute the upgraded detector are being produced at dierent institutes. Ham...

  1. In situ upgrading : coupled enhanced oil recovery with in situ upgrading : ultra dispersed catalysts

    Energy Technology Data Exchange (ETDEWEB)

    Almao, P.P. [Calgary Univ., AB (Canada). Schulich School of Engineering]|[Alberta Ingenuity Centre for In Situ Energy, Edmonton, AB (Canada)

    2007-07-01

    This paper presented a research program that demonstrates the use of ultra dispersed (UD) catalysts as a means of improving the economics of oil sands processing. An outline of current processing techniques was provided. In situ upgrading options included the use of solvents, thermal methods, radiation methods, bio-upgrading, and thermo-catalytic methods. Enhanced oil recovery (EOR) is often combined with in situ upgrading to increase the efficiency of energy use in reservoirs where thermal methods are used. The use of diluents often reduces water usage as well as problems related to contamination and emissions. Recent studies have suggested that vis-breaking (VB) is the lowest investment residual conversion process currently available for in situ processing. UD catalyst formulations can be commercially prepared using nano-particle techniques, and can be used in portable configurations. UD catalysts are known to outperform conventional fixed bed types for both hydrogenation, hydrotreating, and hydrocracking. Research is currently being conducted at the Alberta Ingenuity Centre for In Situ Energy to examine issues related to particles recycling, deactivation and losses. Permeability studies are also being conducted to examine permeability rates of emulsions and nanoparticles through oil sands porous media. The short term financial rewards of various in situ upgrading technologies were also considered. refs., tabs, figs.

  2. Least cost energy planning in Thailand:A case of biogas upgrading in palm oil industry

    Directory of Open Access Journals (Sweden)

    Artite Pattanapongchai

    2011-12-01

    Full Text Available Thailand is currently the world’s fourth largest producer of crude palm oil. The palm oil mill effluent is proposed to beused for biogas production. A value added option is then proposed by increasing thermal efficiency of the biogas by removingCO2 content and increasing the percentage of methane, consequently turning the biogas in to green gas. In this study, thebiogas and upgrading process for electricity generation with the subsidy or adder in the long term planning is presented. Thisanalysis uses the MARKAL-based least-cost energy system as an analytical tool. The objective of this study is to investigateupgrading biogas with a selected water scrubbing technique featuring least-cost energy planning. The co-benefit aspect ofbiogas and biogas upgrading project is analyzed by given an adder of 0.3 Baht/kWh. The target of total electricity generationfrom biogas is 60 MW in 2012. The result shows that green gas will account for approximately 44.91 million m3 in 2012 andincrease to 238.89 million m3 in 2030. The cumulative CO2 emission during 2012-2030 is 2,354.92 thousand tonnes of CO2.Results show that under the given adders the upgrading project is competitive with the conventional technologies in electricitygeneration planning.

  3. Using Qualified Energy Conservation Bonds for Public Building Upgrades. Reducing Energy Bills in the City of Philadelphia

    Energy Technology Data Exchange (ETDEWEB)

    Zimring, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-07-18

    Qualified Energy Conservation Bonds (QECBs) are federally-subsidized bonds that enable state, tribal, and local government issuers to borrow money to fund a range of energy conservation projects, including public building upgrades that reduce energy use by at least 20 percent, at very attractive borrowing rates and long terms. As part of the American Recovery and Reinvestment Act (ARRA), the City of Philadelphia received a $15 million QECB award from the U.S. Department of the Treasury (Treasury). The city leveraged $6.25 million of its QECB allocation to finance half of a $12.6 million initiative to upgrade the energy efficiency of City buildings. The upgrades to four city facilities are expected to deliver over $10 million of net savings, and are a major step towards achieving the city’s goal of reducing government energy consumption by 30 percent by 2015.

  4. Upgrade of the SPS Injection Kicker System for the LHC High Luminosity Operation with Heavy Ion Beam

    CERN Document Server

    Kramer, T; Goddard, B; Ducimetière, L; Sermeus, L; Uythoven, J; Velotti, FM

    2014-01-01

    In the context of the LHC High Luminosity Upgrade project a performance upgrade for heavy ions is envisaged. One of the performance limitations is the rise time of the present SPS injection kicker system MKP. A reduction of the rise time for lead ions was studied in line with a modification of the whole injection system. This paper briefly describes the different rise time options studied for an initially proposed dedicated ion kicker system MKP-I, focuses however on a cost effective alternative using the presently installed 12 MKPS magnets connected to a new fast pulse forming line. As only 12 out of the 16 injection kicker magnets would be fast enough to be used in an upgraded system, additional deflection has to be provided by the septa. The beam optics for that variant is highlighted and first requirements for the septum elements are stipulated. The paper concludes with a failure analysis of the proposed scheme.

  5. System Design of HVDC Project

    Institute of Scientific and Technical Information of China (English)

    Ma Weimin; Yin Weiyang

    2011-01-01

    BackgroundHVDC transmission system is flexible,controllable,economic and environmentfriendly,which has compelling advantages in bulk long-distance power transfer and interconnection of power systems.Since the first HVDC project was put into commercial operation in Gotland in 1954,over 100 HVDC projects have been operating in the world.Currently,there are a number of HVDC projects under being upgraded,constructed or planed in Europe,North America,South America,Africa and Asia.

  6. Conceptual Design Report for a Phase 3 upgrade of the National Synchrotron Light Source

    Energy Technology Data Exchange (ETDEWEB)

    Foyt, W.; Krinsky, S.; Hastings, J. [eds.; Finlay, L.

    1994-03-01

    Considerable investment by both the Department of Energy and the facility`s Participating Research teams has permitted the NSLS to offer a national facility to a wide range of scientific pursuits. The purpose of the NSLS Phase III project is to maximize the scientific output of this premier 2nd generation synchrotron radiation facility through a number of distinct projects. Over the years the NSLS has made significant improvements in the area of beam reliability which has resulted in deliverable, reproducible beam during 98% and 97% of scheduled operations on the VUV and X-ray rings respectively. This project will focus on improving beam intensity and stability by upgrading the optics and detector systems on a number of beamlines as well as upgrading radio frequency (rf) and beam position monitoring systems in the storage rings. In addition, the project includes plans for the design and procurement of a utility isolation system that would guard against voltage transients that disrupt the facility`s electrical system. Also a new insertion device will be installed at beamline X25 and a 2nd floor will be constructed over the X6 -- X16 region which will provide sorely needed laboratory and office space for the user community. This project requests funding of 22.5 million dollars over a three year period: FY 1996 ($6.3M), FY 1997 ($13.4M) and FY 1998 ($2.8M).

  7. Upgrades for the Precision Proton Spectrometer at the LHC: Precision Timing and Tracking Detectors

    CERN Document Server

    Gallinaro, Michele

    2017-01-01

    The CMS-TOTEM Precision Proton Spectrometer (CT-PPS) is an approved project to add tracking and timing information at approximately $\\pm$210~m from the interaction point around the CMS detector. It is designed to operate at high luminosity with up to 50 interactions per 25~ns bunch crossing to perform measurements of e.g. the quartic gauge couplings and search for rare exclusive processes. During 2016, CT-PPS took data in normal high-luminosity proton-proton LHC collisions. In the coming years, high radiation doses and large multiple-vertex interactions will represent difficult challenges that resemble those of the high-luminosity LHC program. A coordinated effort of detector upgrades with the goal of reaching the physics goals while mitigating the degradation effects is under way. Upgrades to the tracking and timing detectors are discussed.

  8. Upgrades for the Precision Proton Spectrometer at the LHC: Precision timing and tracking detectors

    Science.gov (United States)

    Gallinaro, Michele

    2017-03-01

    The CMS-TOTEM Precision Proton Spectrometer (CT-PPS) is an approved project to add tracking and timing information at approximately ±210 m from the interaction point around the CMS detector. It is designed to operate at high luminosity with up to 50 interactions per 25 ns bunch crossing to perform measurements of e.g. the quartic gauge couplings and search for rare exclusive processes. During 2016, CT-PPS took data in normal high-luminosity proton-proton LHC collisions. In the coming years, high radiation doses and large multiple-vertex interactions will represent difficult challenges that resemble those of the high-luminosity LHC program. A coordinated effort of detector upgrades with the goal of reaching the physics goals while mitigating the degradation effects is under way. Upgrades to the tracking and timing detectors are discussed.

  9. A stand-alone track reconstruction algorithm for the scintillating fibre tracker at the LHCb upgrade

    CERN Multimedia

    Quagliani, Renato

    2017-01-01

    The LHCb upgrade detector project foresees the presence of a scintillating fiber tracker (SciFi) to be used during the LHC Run III, starting in 2020. The instantaneous luminosity will be increased up to $2\\times10^{33}$, five times larger than in Run II and a full software event reconstruction will be performed at the full bunch crossing rate by the trigger. The new running conditions, and the tighter timing constraints in the software trigger, represent a big challenge for track reconstruction. This poster presents the design and performance of a novel algorithm that has been developed to reconstruct track segments using solely hits from the SciFi. This algorithm is crucial for the reconstruction of tracks originating from long-lived particles such as $K_{S}^{0}$ and $\\Lambda$ and allows to greatly enhance the physics potential and capabilities of the LHCb upgrade when compared to its previous implementation.

  10. Performance of the Tile PreProcessor Demonstrator for the ATLAS Tile Calorimeter Phase II Upgrade

    CERN Document Server

    Carrio Argos, Fernando; The ATLAS collaboration

    2015-01-01

    The Tile Calorimeter PreProcessor (TilePPr) demonstrator is a high performance double AMC board based on FPGA resources and QSFP modules. This board has been designed in the framework of the ATLAS Tile Calorimeter (TileCal) Demonstrator Project for the Phase II Upgrade as the first stage of the back-end electronics. The TilePPr demonstrator has been conceived for receiving and processing the data coming from the front-end electronics of the TileCal Demonstrator module, as well as for configuring it. Moreover, the TilePPr demonstrator handles the communication with the Detector Control System to monitor and control the front-end electronics. The TilePPr demonstrator represents 1/8 of the final TilePPr that will be designed and installed into the detector for the ATLAS Phase II Upgrade.

  11. Space Charge effects and mitigation in the CERN PS Booster, in view of the Upgrade

    CERN Document Server

    Benedetto, Elena; Forte, Vincenzo; Schmidt, Frank

    2016-01-01

    The CERN PS Booster (PSB) is presently running with a space charge tune spread larger than 0.5 at injection. Since the High Luminosity LHC (HL-LHC) will require beams with twice the intensity and brightness of today, the LHC Injector Upgrade (LIU) Project is putting in place an upgrade program for all the injector chain and, in particular, it relies on the important assumption that the PS Booster can successfully produce these beams after the implementation of the 160 MeV H- injection from Linac4. This contribution describes the studies (measure-ments and simulations) that have been carried out to con- firm that the PSB can indeed perform as needed in terms of beam brightness for the future HL-LHC runs. The importance of the mitigation measures already in place, such as the correction of the half-integer line, and the effects of non-linear resonances on the beam are also discussed.

  12. Neural Network for the Prediction of Retrofitting/Reconditioning/Upgradation cost of CNC Machines

    Directory of Open Access Journals (Sweden)

    BHUPENDRA MISHRA

    2011-10-01

    Full Text Available The main objective of this paper is to predict the Retrofitting/Reconditioning/Upgradation cost of used CNC Machines in manufacturing industries so as to optimize the capital investments on these activities. I find that neural network can be used to predict these costs, as there is no known relationship between the cost underconsideration and the factors responsible for the retrofitting/reconditioning/upgradation. Although few replacement model based on depreciation value of the CNC Machine, but this model fails to account the effect of technological obsolescence, mechanical condition of the machine and the substantial change in the productiontechnology and valid only for the capital retirement, but not able to determine the Retrofitting/Reconditioning/Up-gradation projects and their costing.

  13. Upgrades for the Precision Proton Spectrometer at the LHC: Fast Timing and Tracking Detectors

    CERN Document Server

    Gallinaro, Michele

    2016-01-01

    The CMS-TOTEM Precision Proton Spectrometer (CT-PPS) is an approved project to add tracking and timing information at approximately $\\pm$210~m from the interaction point around the CMS detector. It is designed to operate at high luminosity with up to 50 interactions per 25~ns bunch crossing to perform measurements of e.g. the quartic gauge couplings and search for rare exclusive processes. During 2016, CT-PPS took data in normal high-luminosity proton-proton LHC collisions. In the coming years, high radiation doses and large multiple-vertex interactions will represent difficult challenges that resemble those of the high-luminosity LHC program. A coordinated effort of detector upgrades with the goal of reaching the physics goals while mitigating the degradation effects is under way. Upgrades to the tracking and timing detectors are discussed.

  14. Environmental impact assessment as a complement of life cycle assessment. Case study: Upgrading of biogas.

    Science.gov (United States)

    Morero, Betzabet; Rodriguez, María B; Campanella, Enrique A

    2015-08-01

    This work presents a comparison between an environmental impact assessment (EIA) and a life cycle assessment (LCA) using a case study: upgrading of biogas. The upgrading of biogas is studied using three solvents: water, physical solvent and amine. The EIA follows the requirements of the legislation of Santa Fe Province (Argentina), and the LCA follows ISO 14040. The LCA results showed that water produces a minor impact in most of the considered categories whereas the high impact in the process with amines is the result of its high energy consumptions. The positive results obtained in the EIA (mainly associated with the cultural and socioeconomic components) make the project feasible and all the negative impacts can be mitigated by preventive and remedial measures. From the strengths and weaknesses of each tool, it is inferred that the EIA is a procedure that can complement the LCA. Copyright © 2015 Elsevier Ltd. All rights reserved.

  15. High temperature ceramic membrane reactors for coal liquid upgrading. Quarterly report No. 11, March 21, 1992--June 20, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-12-31

    Membrane reactors have been used in a number of catalytic reaction processes in order to overcome the limitations on conversion imposed by thermodynamic equilibrium. Having the inherent capability for combining reaction and separation in a single step, they offer promise for improving and optimizing yield, selectivity and performance of processes involving complex liquids, such as these typically found in coal liquid upgrading. Ceramic membranes are a new class of materials, which have shown promise in a variety of industrial applications. Their mechanical and chemical stability coupled with a wide range of operating temperatures and pressures make them suitable for environments found in coal liquid upgrading. This project will evaluate the performance of Sol-Gel alumina membranes in coal liquid upgrading processes under realistic temperature and pressure conditions and investigate the feasibility of using such membranes in a membrane reactor based coal liquid upgrading process. Development of novel ceramic membranes with enhanced catalytic activity for coal-liquid upgrading applications, such as carbon-coated alumina membranes, will be also investigated.

  16. Upgrade of the ALICE Inner Tracking System

    CERN Document Server

    INSPIRE-00246160

    2015-01-01

    {During the Long Shutdown 2 (LS2) of the LHC in 2018/2019, the ALICE experiment plans the installation of a novel Inner Tracking System (ITS). The upgraded detector will fully replace the current ITS having six layers by seven layers of Monolithic Active Pixel Sensors (MAPS). The upgraded ITS will have significantly improved tracking and vertexing capabilities, as well as readout rate to cope with the expected increased Pb-Pb luminosity in LHC. The choice of MAPS has been driven by the specific requirements of ALICE as a heavy ion experiment dealing with rare probes at low $p_\\mathrm{T}$. This leads to stringent requirements on the material budget of 0.3$\\%~X/X_{0}$ per layer for the three innermost layers. Furthermore, the detector will see large hit densities of $\\sim 19~\\mathrm{cm}^{-2}/\\mathrm{event}$ on average for minimum-bias events in the inner most layer and has to stand moderate radiation loads of 700 kRad TID and $1\\times 10^{13}$ 1 MeV n$_\\mathrm{eq}/\\mathrm{cm}^{2}$ NIEL at maximum. The MAPS dete...

  17. Simulation study supporting wastewater treatment plant upgrading.

    Science.gov (United States)

    Hvala, N; Vrecko, D; Burica, O; Strazar, M; Levstek, M

    2002-01-01

    The paper presents a study where upgrading of an existing wastewater treatment plant was supported by simulation. The aim of the work was to decide between two technologies to improve nitrogen removal: a conventional activated sludge process (ASP) and a moving bed biofilm reactor (MBBR). To perform simulations, the mathematical models of both processes were designed. The models were calibrated based on data from ASP and MBBR pilot plants operating in parallel on the existing plant. Only two kinetic parameters needed to be adjusted to represent the real plant behaviour. Steady-state analyses have shown a similar efficiency of both processes in relation to carbon removal, but improved performance of MBBR in relation to nitrogen removal. Better performance of MBBR can be expected especially at low temperatures. Simulations have not confirmed the expected less volume required for the MBBR process. Finally, the MBBR was chosen for plant upgrading. The developed process model will be further used to evaluate the final plant configuration and to optimise the plant operating parameters.

  18. Silicon sensor technologies for ATLAS IBL upgrade

    CERN Document Server

    Grenier, P; The ATLAS collaboration

    2011-01-01

    New pixel sensors are currently under development for ATLAS Upgrades. The first upgrade stage will consist in the construction of a new pixel layer that will be installed in the detector during the 2013 LHC shutdown. The new layer (Insertable-B-Layer, IBL) will be inserted between the inner most layer of the current pixel detector and the beam pipe at a radius of 3.2cm. The expected high radiation levels require the use of radiation hard technology for both the front-end chip and the sensor. Two different pixel sensor technologies are envisaged for the IBL. The sensor choice will occur in July 2011. One option is developed by the ATLAS Planar Pixel Sensor (PPS) Collaboration and is based on classical n-in-n planar silicon sensors which have been used for the ATLAS Pixel detector. For the IBL, two changes were required: The thickness was reduced from 250 um to 200 um to improve the radiation hardness. In addition, so-called "slim edges" were designed to reduce the inactive edge of the sensors from 1100 um to o...

  19. The enhanced ASDEX Upgrade pellet centrifuge launcher

    Science.gov (United States)

    Plöckl, B.; Lang, P. T.

    2013-10-01

    Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

  20. The Phase1 CMS Pixel detector upgrade

    CERN Document Server

    Tavolaro, Vittorio Raoul

    2016-01-01

    The pixel detector of the CMS experiment will be replaced in an extended end-of-year shutdown during winter 2016/2017 with an upgraded one able to cope with peak instantaneous luminosities beyond the nominal LHC instantaneous luminosity of $1 \\times 10^{34}$ cm$^{-2}$ s$^{-1}$. Under the conditions expected in the coming years, which will see an increase of a factor two in instantaneous luminosity, the present system would experience a dynamic inefficiency caused mainly by data losses due to buffer overflows. The Phase I upgrade of the CMS pixel detector, described in this paper, will operate at full efficiency at an instantaneous luminosity of $2 \\times 10^{34}$ cm$^{-2}$ s$^{-1}$, thanks to a new readout chip. The new detector will feature one additional tracking point both in the barrel and in the forward regions, while reducing the material budget as a result of a new CO$_{2}$ cooling system and optimised layout of the services. In this paper, the design and the technological choices of the Phase I detect...

  1. The Fast Interaction Trigger Upgrade for ALICE

    CERN Document Server

    Garcia-Solis, Edmundo

    2016-01-01

    The ALICE Collaboration is preparing a major detector upgrade for the second LHC long shutdown (2019–20). The LHC heavy-ion luminosity and collision rate from 2021 onwards will considerably exceed the design parameters of the present ALICE forward trigger detectors. Furthermore, the introduction of a new Muon Forward Tracker (MFT) will significantly reduce the space available for the upgraded trigger detectors. To comply with these conditions a Fast Interaction Trigger (FIT) has been designed. FIT will be the primary forward trigger, luminosity, and collision time measurement detector. The FIT will be capable of triggering at an interaction rate of 50 kHz, with a time resolution better than 30 ps, with 99% efficiency. It will also determine multiplicity, centrality, and reaction plane. FIT will consist of two arrays of Cherenkov radiators with MCP-PMT sensors and of a single, large-size scintillator ring. The arrays will be placed on both sides of the interaction point (IP). Because of the presence of the h...

  2. Readout of the upgraded ALICE-ITS

    Science.gov (United States)

    Szczepankiewicz, A.

    2016-07-01

    The ALICE experiment will undergo a major upgrade during the second long shutdown of the CERN LHC. As part of this program, the present Inner Tracking System (ITS), which employs different layers of hybrid pixels, silicon drift and strip detectors, will be replaced by a completely new tracker composed of seven layers of monolithic active pixel sensors. The upgraded ITS will have more than twelve billion pixels in total, producing 300 Gbit/s of data when tracking 50 kHz Pb-Pb events. Two families of pixel chips realized with the TowerJazz CMOS imaging process have been developed as candidate sensors: the ALPIDE, which uses a proprietary readout and sparsification mechanism and the MISTRAL-O, based on a proven rolling shutter architecture. Both chips can operate in continuous mode, with the ALPIDE also supporting triggered operations. As the communication IP blocks are shared among the two chip families, it has been possible to develop a common Readout Electronics. All the sensor components (analog stages, state machines, buffers, FIFOs, etc.) have been modelled in a system level simulation, which has been extensively used to optimize both the sensor and the whole readout chain design in an iterative process. This contribution covers the progress of the R&D efforts and the overall expected performance of the ALICE-ITS readout system.

  3. ATLAS Upgrade Instrumentation in the US

    CERN Document Server

    INSPIRE-00069444; Evans, Hal; Seiden, Abe

    2013-01-01

    Planned upgrades of the LHC over the next decade should allow the machine to operate at a center of mass energy of 14 TeV with instantaneous luminosities in the range 5--7e34 cm^-2 s^-1. With these parameters, ATLAS could collect 3,000 fb^-1 of data in approximately 10 years. However, the conditions under which this data would be acquired are much harsher than those currently encountered at the LHC. For example, the number of proton-proton interactions per bunch crossing will rise from the level of 20--30 per 50 ns crossing observed in 2012 to 140--200 every 25 ns. In order to deepen our understanding of the newly discovered Higgs boson and to extend our searches for physics beyond that new particle, the ATLAS detector, trigger, and readout will have to undergo significant upgrades. In this whitepaper we describe R&D necessary for ATLAS to continue to run effectively at the highest luminosities foreseen from the LHC. Emphasis is placed on those R&D efforts in which US institutions are playing a leadin...

  4. Upgrade of the ALICE Inner Tracking System

    CERN Document Server

    Rossegger, Stefan

    2013-01-01

    The Inner Tracking System (ITS) is the key ALICE detector for the study of heavy flavour production at LHC. Heavy flavor can be studied via the identification of short-lived hadrons containing heavy quarks which have a mean proper decay length in the order of 100-300 $\\mu$m. To accomplish this task, the ITS is composed of six cylindrical layers of silicon detectors (two pixel, two drift and two strip) with a radial coverage from 3.9 to 43 cm and a material budget of 1.1% X0 per layer. %In particular, the properties of the two innermost layers define the ITS performance in measuring the displaced vertex of such short-lived particles. In order to enhance the ALICE physics capabilities, and, in particular, the tracking performance for heavy-flavour detection, the possibility of an ITS upgrade has been studied in great detail. It will make use of the spectacular progress made in the field of imaging sensors over the last ten years as well as the possibility to install a smaller radius beampipe. The upgraded detec...

  5. The CEBAF RF Separator System Upgrade

    CERN Document Server

    Hovater, C; Guerra, A; Nelson, R; Terrel, R A; Wissmann, M

    2004-01-01

    The CEBAF accelerator uses RF deflecting cavities operating at the third sub-harmonic (499 MHz) of the accelerating frequency (1497 MHz) to “kick” the electron beam to the experimental halls. The cavities operate in a TEM dipole mode incorporating mode enhancing rods to increase the cavity’s transverse shunt impedance. As the accelerators energy has increased from 4 GeV to 6 GeV the RF system, specifically the 1 kW solid state amplifiers, have become problematic, operating in saturation because of the increased beam energy demands. Two years ago we began a study to look into replacement for the RF amplifiers and decided to use a commercial broadcast Inductive Output Tube (IOT) capable of 30 kW. The new RF system uses one IOT amplifier on multiple cavities as opposed to one amplifier per cavity originally. In addition the new RF system supports the proposed 12 GeV energy upgrade to CEBAF. Currently we are halfway through the upgrade with two IOTs in operation and two more to be in...

  6. The Upgrade of the ATLAS Inner Detector

    CERN Document Server

    Ferrere, D; The ATLAS collaboration

    2012-01-01

    With the Large Hadron Collider (LHC) successfully collecting data at 7 TeV and even at 8 TeV since April 2012, plans are actively advancing for a series of upgrades in phase with the three long shutdown periods leading to detector improvement. The ATLAS collaboration will upgrade at the next shutdown in 2013-2014 its semiconductor pixel tracking detector with a new Insertable BLayer (IBL) between the existing innermost pixel layer and the vacuum pipe of the LHC. The extreme operating conditions at this location led considering the development of new radiation hard pixel sensor technologies and a new front-end readout chip. The IBL community is currently working for producing modules with silicon planar and 3D technology towards the loading on 14 local stave structures as well as the integration around the beam pipe and in the ATLAS detector. The High-Luminosity LHC (HL-LHC) will eventually increase to about five times the LHC design-luminosity some 10-years from now requiring a complete Inner Detector replace...

  7. HYBRID SULFUR RECOVERY PROCESS FOR NATURAL GAS UPGRADING

    Energy Technology Data Exchange (ETDEWEB)

    Girish Srinivas; Steven C. Gebhard; David W. DeBerry

    2001-05-01

    This first quarter report of 2001 describes progress on a project funded by the U.S. Department of Energy (DOE) to test a hybrid sulfur recovery process for natural gas upgrading. The process concept represents a low cost option for direct treatment of natural gas streams to remove H{sub 2}S in quantities equivalent to 0.2-25 metric tons (LT) of sulfur per day. This process is projected to have lower capital and operating costs than the competing technologies, amine/aqueous iron liquid redox and amine/Claus/tail gas treating, and have a smaller plant footprint, making it well suited to both on-shore and offshore applications. CrystaSulf{trademark} (service mark of Gas Research Institute) is a new nonaqueous sulfur recovery process that removes hydrogen sulfide (H{sub 2}S) from gas streams and converts it into elemental sulfur. CrystaSulf features high sulfur recovery similar to aqueous-iron liquid redox sulfur recovery processes, but differs from the aqueous processes in that CrystaSulf controls the location where elemental sulfur particles are formed. In the hybrid process, approximately 1/3 of the total H{sub 2}S in the natural gas is first oxidized to SO{sub 2} at low temperatures over a heterogeneous catalyst. Low temperature oxidation is done so that the H{sub 2}S can be oxidized in the presence of methane and other hydrocarbons without oxidation of the hydrocarbons. The project involves the development of a catalyst using laboratory/bench-scale catalyst testing, and then demonstration of the catalyst at CrystaTech's pilot plant in west Texas. During this reporting periods new catalyst formulations were tested. The experiments showed that the newest catalyst has slightly better performance, but catalyst TDA No.2 is still superior overall for use with the hybrid CrystaSulf process due to lower costs. Plans for catalyst pelletization and continued testing are described.

  8. Towards Optimum Material Choices for HL-LHC Collimator Upgrade

    CERN Document Server

    Quaranta, E.; Biancacci, N.; Bruce, R.; Carra, F.; Métral, E.; Redaelli, S.; Rossi, A.; Salvant, B.

    2016-01-01

    properties that address different limitations of the present collimation system, solutions have been found to fulfil various upgrade challenges. This paper describes the proposed staged approach to deploy new materials in the upgraded HL-LHC collimation system. Beam tests at the CERN HiRadMat facility were also performed to benchmark simulation methods and constitutive material models.

  9. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway

    Energy Technology Data Exchange (ETDEWEB)

    Davis, R.; Biddy, M.; Jones, S.

    2013-03-01

    This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks.

  10. The CDF II eXtremely fast tracker upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abulencia, A.; Azzurri, P.; Cochran, E.; Dittmann, J.; Donati, S.; Efron, J.; Erbacher, R.; Errede, D.; Fedorko, I.; Flanagan, G.; Forrest, R.; /Illinois U., Urbana

    2006-09-01

    The CDF II Extremely Fast Tracker is the trigger track processor which reconstructs charged particle tracks in the transverse plane of the CDF II central outer tracking chamber. The system is now being upgraded to perform a three dimensional track reconstruction. A review of the upgrade is presented here.

  11. Magnetic switching, final chapter, Book I: the ATA upgrade prototype

    Energy Technology Data Exchange (ETDEWEB)

    Birx, D.; Cook, E.; Hawkins, S.; Poor, S.; Reginato, L.; Schmidt, J.; Smith, M.W.

    1983-03-22

    Efforts directed at finding a 10 kHz switch to replace the current 1 kHz gas blown spark gap have culminated in a prototype for an upgrade of ATA. The design and performance of this prototype as well as possible options and recommendations concerning an eventual upgrade are described. 4 references, 9 figures.

  12. Magnetic switching, final chapter, Book I: the ATA upgrade prototype

    Energy Technology Data Exchange (ETDEWEB)

    Birx, D.; Cook, E.; Hawkins, S.; Poor, S.; Reginato, L.; Schmidt, J.; Smith, M.W.

    1983-03-22

    Efforts directed at finding a 10 kHz switch to replace the current 1 kHz gas blown spark gap have culminated in a prototype for an upgrade of ATA. The design and performance of this prototype as well as possible options and recommendations concerning an eventual upgrade are described. 4 references, 9 figures.

  13. LHCb RICH Upgrade: an overview of the photon detector and electronics system

    CERN Document Server

    Cassina, L

    2016-01-01

    The LHCb experiment is one of the four large detectors operating at the LHC at CERN and it is mainly devoted to CP violation measurements and to the search for new physics in rare decays of beauty and charm hadrons. The data from the two Ring Image Cherenkov (RICH-1 and RICH-2) detectors are essential to identify particles in a wide momentum range. From 2019 onwards 14 TeV collisions with luminosities reaching up to $2\\cdot10^{33}$ cm$^{-2}$ s$^{-1}$ with 25 ns bunch spacing are planned, with the goal of collecting 5 fb$^{-1}$ of data per year. In order to avoid degradation of the PID performance at such high rate (40 MHz), the RICH detector has to be upgraded. New photodetectors (Multi-anode photomultiplier tubes, MaPMTs) have been chosen and will be read out using a 8-channels chip, named CLARO, designed to sustain a photon counting rate up to 40 MHz, while minimizing the power consumption and the cross-talk. A 128-bit digital register allows selection of thresholds and attenuation values and provides featu...

  14. LHCb RICH Upgrade: an overview of the photon detector and electronic system

    Science.gov (United States)

    Cassina, L.

    2016-01-01

    The LHCb experiment is one of the four large detectors operating at the LHC at CERN and it is mainly devoted to CP violation measurements and to the search for new physics in rare decays of beauty and charm hadrons. The data from the two Ring Image Cherenkov (RICH-1 and RICH-2) detectors are essential to identify particles in a wide momentum range. From 2019 onwards 14 TeV collisions with luminosities reaching up to 2 × 1033 cm-2s-1 with 25 ns bunch spacing are planned, with the goal of collecting 5 fb-1 of data per year. In order to avoid degradation of the PID performance at such high rate (40 MHz), the RICH detector has to be upgraded. New photodetectors (Multi-anode photomultiplier tubes, MaPMTs) have been chosen and will be read out using an 8-channel chip, named CLARO, designed to sustain a photon counting rate up to 40 MHz, while minimizing the power consumption and the cross-talk. A 128-bit digital register allows selection of thresholds and attenuation values and provides features useful for testing and debugging. Photosensors and electronics are arranged in basic units, the first prototypes of which have been tested in charged particle beams in autumn 2014. An overview of the CLARO features and of the readout electronics is presented.

  15. LHCb RICH Upgrade: an overview on the photon detector and the electronics system

    CERN Multimedia

    Cassina, Lorenzo

    2015-01-01

    The LHCb experiment is one of the four detectors operating at the LHC at CERN and it is mainly devoted to CP violation measurements and the search for new physics in beauty and charm hadrons rare decays. The data from the two Ring Image Cherenkov (RICH-1 and RICH-2) detectors are essential to identify particles in a wide momentum range. Up to now the luminosity has reached up to 4 . $10^{32}$ cm$^{-2}$s$^{-1}$ with 50 ns bunch spacing and 3 fb$^{-1}$ have been collected since 2010. From 2019 onwards 14 TeV collisions with luminosities reaching up to 2 . $10^{33}$ cm$^{-2}$s$^{-1}$ with 25 ns bunch spacing are planned, with the goal of collecting 5 fb$^{-1}$ of data per year. In order to avoid degradation of the RICH detectors particle identification performance at such high rate (40 MHz), a detector upgrade is necessary. The present photodetectors (HPDs equipped with encapsulated 1 MHz readout chips) will be replaced with flat panel MaPMTs read out by external chips, designed for this purpose. The 25.4x25.4 m...

  16. Using Retrofit Nail Base Panels to Expand the Market for Wall Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Del Bianco, M. [Home Innovation Research Lab., Upper Marlboro, MD (United States); Wiehagen, J. [Home Innovation Research Lab., Upper Marlboro, MD (United States)

    2016-02-01

    This project evaluated the effectiveness and affordability of integrating retrofit insulated panels into a re-siding project. The Partnership for Home Innovation (PHI) teamed with New York State Energy Research and Development Authority (NYSERDA), the Albany Housing Authority (AHA), and the New York State Weatherization Assistance Program (WAP) administered by Albany Community Action Partnership to demonstrate an energy retrofit and siding upgrade on a two-story, seven unit, multifamily building in Albany New York (CZ 5). The project focused on accomplishing three goals - doubling the existing wall thermal resistance (from approximately R-13 to a weighted average of R-27), reduction of building air leakage, and completion of the retrofit within a budget where the additional cost for upgrading wall's thermal resistance is equal to the cost of the standard re-siding effort (i.e., the total cost of the energy efficient re-siding scope of work is not more than double the cost of the standard re-siding effort). Lessons learned from the project strongly indicate that the retrofit panel technology can be installed using common installation practices and with minimal training. Other lessons learned include limitation on the use of standard air sealing materials during cold weather installations and the need to develop better installation guidance for trades working with the level of tolerances that may be present in the existing structure. This technology demonstration showed that exterior retrofit panels provide a viable and reasonable option for the siding trades to increase market opportunities and achieve synergistic benefits for aesthetic upgrades to a building's exterior.

  17. Initital Upgrade of the ATLAS Level-1 Calorimeter Trigger

    CERN Document Server

    Ta, DB; The ATLAS collaboration

    2014-01-01

    The Level-1 calorimeter trigger (L1Calo) of the ATLAS experiment has been operating well since the start of LHC data taking and played a major role in the Higgs boson discovery. To face the new challenges posed by the upcoming increases of the LHC proton beam energy and luminosity, a series of upgrades is planned for L1Calo. This poster presents the L1Calo upgrade program for the initial upgrade phase in 2013-14. The program includes substantial improvements to the analogue and digital signal processing. Two existing digital algorithm processor subsystems will receive hardware and firmware upgrades to increase the real-time data path bandwidth, allowing topological information to be processed at level-1. An entirely new subsystem, the L1 topological processor, will receive real-time data from both the upgraded L1Calo and L1- muon trigger to perform trigger algorithms based on entire event topologies.

  18. The 12 GeV Energy Upgrade at Jefferson Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Pilat, Fulvia C.

    2012-09-01

    Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

  19. Financing Energy Upgrades for K-12 School Districts: A Guide to Tapping into Funding for Energy Efficiency and Renewable Energy Improvements

    Energy Technology Data Exchange (ETDEWEB)

    Goggio Borgeson, Merrian [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Zimring, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division

    2013-04-01

    This guide focuses on clean energy financing options for school administrators, facility managers, and other K-12 school decision makers who are considering investments in high performance school projects. This guide explicitly focuses on comprehensive energy upgrades, those that involve multiple measures and are targeted toward achieving significant energy savings. Successful implementation of clean energy upgrades in schools is a matter of understanding the opportunity, making the commitment, and creatively tapping into available financing. This guide attempts to provide the foundation needed for successful projects in U.S. schools. It walks through the financing options available to K-12 schools and provides case studies of six school districts from around the country.

  20. ATLAS Offline Data Quality System Upgrade

    CERN Document Server

    Farrell, Steve

    2012-01-01

    The ATLAS data quality software infrastructure provides tools for prompt investigation of and feedback on collected data and propagation of these results to analysis users. Both manual and automatic inputs are used in this system. In 2011, we upgraded our framework to record all issues affecting the quality of the data in a manner which allows users to extract as much information (of the data) for their particular analyses as possible. By improved recording of issues, we are allowed the ability to reassess the impact of the quality of the data on different physics measurements and adapt accordingly. We have gained significant experience with collision data operations and analysis; we have used this experience to improve the data quality system, particularly in areas of scaling and user interface. This document describes the experience gained in assessing and recording of the data quality of ATLAS and subsequent benefits to the analysis users.

  1. Moscow Meson Factory DTL RF System Upgrade

    CERN Document Server

    Esin, S K; Kvasha, A I; Serov, V L

    2004-01-01

    The last paper devoted to description of the first part (DTL) RF system of Moscow Meson Factory upgrade was published in the Proceedings of PAC95 Conference in Dallas. Since then some new works directed at improvement of reliability and efficiency of the RF system were carried out. Among them there are a new powerful pulse triode “Katran” installed in the output RF power amplifiers (PA) of three channels, modifications of the anode modulator control circuit and crow-bar system, a new additional RF channel for RF supply of RFQ and some alterations in placing of the anode modulator equipment decreasing a level of interference’s at crow-bar circuits. Some new checked at MMF RF channels ideas concerning of PA tuning are of interest for people working in this sphere of activity.

  2. The LHCb trigger and its upgrade

    Science.gov (United States)

    Dziurda, A.

    2016-07-01

    The current LHCb trigger system consists of a hardware level, which reduces the LHC inelastic collision rate of 30 MHz, at which the entire detector is read out. In a second level, implemented in a farm of 20 k parallel-processing CPUs, the event rate is reduced to about 5 kHz. We review the performance of the LHCb trigger system during Run I of the LHC. Special attention is given to the use of multivariate analyses in the High Level Trigger. The major bottleneck for hadronic decays is the hardware trigger. LHCb plans a major upgrade of the detector and DAQ system in the LHC shutdown of 2018, enabling a purely software based trigger to process the full 30 MHz of inelastic collisions delivered by the LHC. We demonstrate that the planned architecture will be able to meet this challenge.

  3. BESIII ETOF upgrade readout electronics commissioning

    Science.gov (United States)

    Wang, Xiao-Zhuang; Dai, Hong-Liang; Wu, Zhi; Heng, Yue-Kun; Zhang, Jie; Cao, Ping; Ji, Xiao-Lu; Li, Cheng; Sun, Wei-Jia; Wang, Si-Yu; Wang, Yun

    2017-01-01

    It is proposed to upgrade the endcap time-of-flight (ETOF) of the Beijing Spectrometer III (BESIII) with a multi-gap resistive plate chamber (MRPC), aiming at an overall time resolution of about 80 ps. After completing the entire readout electronics system, some experiments, such as heat radiation, radiation hardness and large-current beam tests, have been carried out to confirm the reliability and stability of the readout electronics. An on-detector test of the readout electronics has also been performed with the beam at the BEPCII E3 line. The test results indicate that the readout electronics system fulfills its design requirements. Supported by Chinese Academy of Sciences (1G201331231172010)

  4. Big advance towards the LHC upgrade

    CERN Multimedia

    CERN Bulletin

    2010-01-01

    The LHC is currently the world’s most powerful accelerator. With its technical achievements it has already set world records. However, big science looks very far ahead in time and is already preparing already for the LHC’s magnet upgrade, which should involve a 10-fold increase of the collision rates toward the end of the next decade. The new magnet technology involves the use of an advanced superconducting material that has just started to show its potential.   The first Long Quadrupole Shell (LQS01) model during assembly at Fermilab. The first important step in the qualification of the new technology for use in the LHC was achieved at the beginning of December when the US LHC Accelerator Research Program (LARP) – a consortium of Brookhaven National Laboratory, Fermilab, Lawrence Berkeley National Laboratory and the SLAC National Accelerator Laboratory founded by US Department Of Energy (DOE) in 2003 – successfully tested the first long focussing magnet th...

  5. LLRF System for the CEBAF Separator Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Plawski, Tomasz E. [JLAB; Bachimanchi, Ramakrishna [JLAB; Hovater, J. Curt [JLAB; Seidman, David J. [JLAB; Wissmann, Mark J. [JLAB

    2014-12-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. This system will work together with the existing 499 MHz RF Separator in order to allow simultaneous delivery of the beam to four CEBAF experimental halls. The RF system employs two digital LLRF systems controlling four cavities in a vector sum. Cavity tune information of the individual cavities is also obtained using a multiplexing scheme of the forward and reflected RF signals. In this paper we will present detailed LLRF design and the current status of the CEBAF 748.5/499 MHz beam extraction system.

  6. LS1: electrical engineering upgrades and consolidation

    CERN Document Server

    Duval, F

    2012-01-01

    Compared to past shutdowns, the Engineering Department Electrical Engineering (EN-EL) Group's activity volume will be multiplied by about four during LS1. The Group is experienced in handling such situations and will cope with this by transferring manpower from studies to worksite supervision and thanks to its subcontractors who know how to increase their manpower in such a manner as to maintain a good level of professionalism. EN-EL is substantially increasing its resources to cope with this workload. This increase in resources is, however, limited by the management capacity of EN-EL's core staff. As a consequence, not all of the requested activities will be possible and prioritization will be necessary. This paper details the upgrades and the consolidation to be carried out during LS1 and the measures taken by EN-EL to cope with this heavy workload.

  7. ATLAS Offline Data Quality System Upgrade

    CERN Document Server

    Farrell, S; The ATLAS collaboration

    2012-01-01

    The ATLAS data quality software infrastructure provides tools for prompt investigation of and feedback on collected data and propagation of these results to analysis users. Both manual and automatic inputs are used in this system. In 2011, we upgraded our framework to record all issues affecting the quality of the data in a manner which allows users to extract as much information (of the data) for their particular analyses as possible. By improved recording of issues, we are allowed the ability to reassess the impact of the quality of the data on different physics measurements and adapt accordingly. We have gained significant experience with collision data operations and analysis; we have used this experience to improve the data quality system, particularly in areas of scaling and user interface. This poster describes the experience gained in assessing and recording of the data quality of ATLAS and subsequent benefits to the analysis users.

  8. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F; The ATLAS collaboration

    2014-01-01

    This presentation summarizes the status of the on-detector and off-detector electronics developments for the Phase II Upgrade of the ATLAS Tile Calorimeter at the LHC scheduled around 2024. A demonstrator prototype for a slice of the calorimeter including most of the new electronics is planned to be installed in ATLAS in middle 2014 during the Long Shutdown. For the on-detector readout, three different front-end boards (FEB) alternatives are being studied: a new version of the 3-in-1 card, the QIE chip and a dedicated ASIC called FATALIC. The MainBoard will provide communication and control to the FEBs and the DaughterBoard will transmit the digitized data to the off-detector electronics in the counting room, where the sROD will perform processing tasks on them.

  9. Upgrading the ATLAS Tile Calorimeter Electronics

    Directory of Open Access Journals (Sweden)

    Carrió Fernando

    2013-11-01

    Full Text Available This work summarizes the status of the on-detector and off-detector electronics developments for the Phase 2 Upgrade of the ATLAS Tile Calorimeter at the LHC scheduled around 2022. A demonstrator prototype for a slice of the calorimeter including most of the new electronics is planned to be installed in ATLAS in the middle of 2014 during the first Long Shutdown. For the on-detector readout, three different front-end boards (FEB alternatives are being studied: a new version of the 3-in-1 card, the QIE chip and a dedicated ASIC called FATALIC. The Main Board will provide communication and control to the FEBs and the Daughter Board will transmit the digitized data to the off-detector electronics in the counting room, where the super Read-Out Driver (sROD will perform processing tasks on them and will be the interface to the trigger levels 0, 1 and 2.

  10. RICH upgrade: Current status and future perspectives

    CERN Document Server

    Pistone, A

    2016-01-01

    The LHCb experiment is dedicated to precision measurements of CP violation and rare decays of B hadrons at the Large Hadron Collider (LHC) at CERN (Geneva). The second long shutdown of the LHC is currently scheduled to begin in 2018. During this period the LHCb experiment with all its sub-detectors will be upgraded in order to run at an instantaneous luminosity of 2×10$^{33}$ cm$^{−2}$s$^{−1}$ and to read out data at a rate of 40MHz into a flexible software-based trigger. The Ring Imaging CHerenkov (RICH) system will require new photon detectors and modifications of the optics of the upstream detector. Tests of the prototype of the smallest constituent of the new RICH system have been performed during testbeam sessions at the Test Beam Facility SPS North Area (CERN) in Autumn 2014.

  11. PEP-II Transverse Feedback Electronics Upgrade

    CERN Document Server

    Weber, Jonah; Chin, Michael; Doolittle, Lawrence

    2005-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx® ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  12. The upgraded S18 neutron interferometer

    Energy Technology Data Exchange (ETDEWEB)

    Bruckner, G. [Institut Max von Laue - Paul Langevin (ILL), 38 - Grenoble (France)]|[Atominstitut der Oesterreichischen Universitaeten, Vienna (Austria)

    1999-11-01

    The instrument S18, the perfect-crystal neutron interferometer was reopened in October 1998. The instrument, which was dismantled during the reactor shutdown, has been set up again within the last two years. The upgraded version allows more advanced neutron optics experiments for fundamental, nuclear and condensed-matter physics. The instrument also takes advantage of the new super-mirror guide which provides considerably higher intensities. Several types of large perfect-crystal interferometers are available for different applications. A new multipurpose monochromator allows the use of a wide wavelength range and the configuration of the system as an advanced high-resolution Bonse-Hart small-angle scattering camera. Another instrument option is the use of completely polarised beams which are obtained using permanent magnetic prism deflection. An additional third analyser axis permits novel post-selection experiments concerning momentum distribution and polarisation analysis of the interfering beams. (author) 11 refs., 2 figs.

  13. Upgrade of the LHCb ECAL monitoring system

    CERN Document Server

    Guz, Yu

    2015-01-01

    The LHCb ECAL is a shashlik calorimeter of 6016 cells, covering 7.68 x 6.24 m$^2$ area. To monitor the readout chain of each ECAL cell, the LHCb ECAL is equipped with a LED based monitoring system. During the LHC Run I (2009-2012) it was found that the precision of the monitoring suffers from the radiation degradation of transparency of polystyrene clear fibers used to transport the LED light to the ECAL photomultipliers. In order to improve the performance of the monitoring system, and especially in view of significant increase of LHCb working luminosity foreseen after 2018, the present plastic fibers have been replaced by radiation hard quartzfi bers. The performance of the old LHCb ECAL monitoring system during LHC Run I and the design of the upgraded system are discussed here.

  14. PEP-II Transverse Feedback Electronics Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Weber, J.M.; Chin, M.J.; Doolittle, L.R.; /LBL, Berkeley; Akre, R.; /SLAC

    2006-03-13

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx{reg_sign} ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  15. PEP-II Transverse Feedback Electronics Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Weber, J.; Chin, M.; Doolittle, L.; Akre, R.

    2005-05-09

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(R) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  16. UPGRADING NATURAL GAS VIA MEMBRANE SEPARATION PROCESSES

    Energy Technology Data Exchange (ETDEWEB)

    S.A.Stern; P.A. Rice; J. Hao

    2000-03-01

    The objective of the present study is to assess the potential usefulness of membrane separation processes for removing CO{sub 2} and H{sub 2}S from low-quality natural gas containing substantial amounts of both these ''acid'' gases, e.g., up to 40 mole-% CO{sub 2} and 10 mole-% H{sub 2}S. The membrane processes must be capable of upgrading the crude natural gas to pipeline specifications ({le} 2 mole-% CO{sub 2}, {le} 4 ppm H{sub 2}S). Moreover, these processes must also be economically competitive with the conventional separation techniques, such as gas absorption, utilized for this purpose by the gas industry.

  17. C-2-Upgrade Field Reversed Configuration Experiment

    Science.gov (United States)

    Smirnov, Artem

    2016-10-01

    In the C-2 field-reversed configuration (FRC) experiment, tangential neutral beam injection (20 - 40 keV hydrogen, 4 MW total), coupled with electrically-biased plasma guns at the plasma ends, magnetic end plugs, and advanced surface conditioning, led to dramatic reductions in turbulence-driven losses and greatly improved plasma stability. Under such conditions, highly reproducible FRCs with a significant fast-ion population and total plasma temperature of about 1 keV were achieved. The FRC's were macroscopically stable and decayed on characteristic transport time scales of a few milliseconds. In order to sustain an FRC configuration, the C-2 device was upgraded with a new neutral beam injection (NBI) system, which can deliver a total of 10 + MW of hydrogen beam power, by far the largest ever used in a compact toroid plasma experiment. Compared to C-2, the beam energy was lowered to 15 keV and angled injection geometry was adopted to provide better beam coupling to the FRC. The upgraded neutral beams produce a dominant fast ion population that makes a dramatic beneficial impact on the overall plasma performance. Specifically: (1) high-performance, advanced beam-driven FRCs were produced and sustained for times significantly longer (5 + ms) than all characteristic plasma decay times without the beams, (2) the sustainment is fully correlated with neutral beam injection, (3) confinement of fast ions is close to the classical limit, and (4) new, benign collective fast ion effects were observed. Collectively, these accomplishments represent a dramatic advance towards the scientific validation of the FRC-based approach to fusion. This talk will provide a comprehensive overview of the C-2U device and recent experimental advances.

  18. Life cycle assessment of biogas upgrading technologies.

    Science.gov (United States)

    Starr, Katherine; Gabarrell, Xavier; Villalba, Gara; Talens, Laura; Lombardi, Lidia

    2012-05-01

    This article evaluates the life cycle assessment (LCA) of three biogas upgrading technologies. An in-depth study and evaluation was conducted on high pressure water scrubbing (HPWS), as well as alkaline with regeneration (AwR) and bottom ash upgrading (BABIU), which additionally offer carbon storage. AwR and BABIU are two novel technologies that utilize waste from municipal solid waste incinerators - namely bottom ash (BA) and air pollution control residues (APC) - and are able to store CO(2) from biogas through accelerated carbonation processes. These are compared to high pressure water scrubbing (HPWS) which is a widely used technology in Europe. The AwR uses an alkaline solution to remove the CO(2) and then the solution - rich in carbonate and bicarbonate ions - is regenerated through carbonation of APC. The BABIU process directly exposes the gas to the BA to remove and immediately store the CO(2), again by carbonation. It was determined that the AwR process had an 84% higher impact in all LCA categories largely due to the energy intensive production of the alkaline reactants. The BABIU process had the lowest impact in most categories even when compared to five other CO(2) capture technologies on the market. AwR and BABIU have a particularly low impact in the global warming potential category as a result of the immediate storage of the CO(2). For AwR, it was determined that using NaOH instead of KOH improves its environmental performance by 34%. For the BABIU process the use of renewable energies would improve its impact since accounts for 55% of the impact. Copyright © 2011 Elsevier Ltd. All rights reserved.

  19. A large divertor manipulator for ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Herrmann, Albrecht, E-mail: albrecht.herrmann@ipp.mpg.de; Jaksic, Nikola; Leitenstern, Peter; Greuner, Henri; Krieger, Karl; Marné, Pascal de; Oberkofler, Martin; Rohde, Volker; Schall, Gerd

    2015-10-15

    Highlights: • A large divertor manipulator for ASDEX Upgrade is developed and tested. • It allows replacing a relevant part of the divertor by dedicated targets and probes. • Modified solid standard targets. • Electrical and mechanical probes for dedicated investigations. • Test of actively cooled component. - Abstract: In 2013 a new bulk tungsten divertor, Div-III, was installed in ASDEX Upgrade (AUG). During the concept and design phase of Div-III the option of adaptable divertor instrumentation and divertor modification as contribution for divertor investigations in preparation of ITER was given a high priority. To gain flexibility for the test of divertor modifications without affecting the operational space of AUG, the large divertor manipulator, DIM-II, was designed and installed. DIM-II allows to retract 2 out of 128 outer divertor target tiles including the water cooled support structure into a target exchange box and to replace these targets without breaking the vacuum of the AUG vessel. DIM-II is based on a carriage-rail system with a driving rod pushing a front-end with the target module into the divertor position for plasma operation. Three types of front-ends are foreseen for physics investigations: (i) modified standard targets clamped to the standard cooling structure, (ii) dedicated front-ends making use of the whole available volume of about 230 × 160 × 80 mm{sup 3} and (iii) actively cooled/heated targets for cooling water temperatures up to 230 °C. This paper presents the DIM-II design including the FEM calculations for the modified divertor support structure and the front-end options, as well as the test procedure and operation mode.

  20. ATLAS Upgrades: a challenge for the next Decades

    CERN Document Server

    Aielli, Giulio; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is now running at the center-of-mass energies of 13 TeV. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset for ATLAS and CMS from about few hundred fb-1 expected for LHC running in the next 10 years to 3000 fb-1 by around 2035. In parallel, the experiments need to be kept lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Along with maintenance and consolidation of the detector in the past few years, ATLAS has added inner b-layer to its tracking system. The challenge of coping with the HL-LHC instantaneous and integrated luminosities, along with the associated radiation levels, requires further maj...

  1. Extension - Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption

    Energy Technology Data Exchange (ETDEWEB)

    Anna Lee Tonkovich

    2008-08-11

    The need for cost effective technologies for upgrading coal mine methane to pipeline quality natural gas is becoming ever greater. The current work presents and investigates a new approach to reduce the impact of the most costly step in the conventional technology, nitrogen rejection. The proposed approach is based on the Velocys microchannel platform, which is being developed to commercialize compact and cost efficient chemical processing technology. For this separation, ultra fast thermal swing sorption is enabled by the very high rates of heat and mass transfer inherent in microchannel processing. In a first phase of the project solid adsorbents were explored. Feasibility of ultrafast thermal swing was demonstrated but the available adsorbents had insufficient differential methane capacity to achieve the required commercial economics. In a second phase, ionic liquids were adopted as absorbents of choice, and experimental work and economic analyses, performed to gauge their potential, showed promise for this novel alternative. Final conclusions suggest that a combination of a required cost target for ionic liquids or a methane capacity increase or a combination of both is required for commercialization.

  2. Future Upgrade and Physics Perspectives of the ALICE TPC

    CERN Document Server

    INSPIRE-00033137

    2014-01-01

    The ALICE experiment at the Large Hadron Collider (LHC) proposes major detector upgrades to fully exploit the increase of the luminosity of the LHC in RUN~3 and to extend the physics reach for rare probes at low transverse momentum. The Time Projection Chamber (TPC) is one of the main tracking and PID devices in the central barrel of ALICE. The maximum trigger rate of the TPC is currently limited to about 3.5 kHz by the operation of a gating grid system. In order to make full use of the luminosity in RUN 3, the TPC is foreseen to be operated in an ungated mode with continuous readout. The existing MWPC readout will be replaced by a Micro-Pattern Gaseous Detector (MPGD) based readout, which provides intrinsic ion capture capability without gating. Extensive detector R\\&D employing Gas Electron Multiplier (GEM) and Micro-Mesh Gaseous detector (Micromegas) technologies, and simulation studies to advance the techniques for the corrections of space-charge distortions have been performed since 2012. In this pap...

  3. ALICE TPC upgrade for High-Rate operations

    CERN Document Server

    ,

    2015-01-01

    A new type of Time Projection Chamber (TPC) has been proposed for the upgrade of the ALICE (A Large Ion Collider Experiment at CERN) so as to cater to the high luminosity environment expected at the Large Hadron Collider (LHC) facility in future. This device will rely on the intrinsic ion back flow (IBF) suppression of Micro-Pattern Gas Detectors (MPGD) based technology in particular the Gas Electron Multiplier (GEM). GEM is to minimise the space charge effect in the main drift volume and thus will not require the standard gating grid and the resulting intrinsic dead time. It will thus be possible to read all minimum bias Pb--Pb events that the Large Hadron Collider (LHC) will deliver at the anticipated peak interaction rate of 50 kHz for the high luminosity heavy-ion era in Run 3. New read-out electronics will send the continuous data stream to a new online farm at rates up to 1~TByte/s. The new read-out chambers will consist of stacks of 4 GEM foils combining different hole pitches. In addition to a low ion...

  4. Upgrading NASA/DOSE laser ranging system control computers

    Science.gov (United States)

    Ricklefs, Randall L.; Cheek, Jack; Seery, Paul J.; Emenheiser, Kenneth S.; Hanrahan, William P., III; Mcgarry, Jan F.

    1993-01-01

    Laser ranging systems now managed by the NASA Dynamics of the Solid Earth (DOSE) and operated by the Bendix Field Engineering Corporation, the University of Hawaii, and the University of Texas have produced a wealth on interdisciplinary scientific data over the last three decades. Despite upgrades to the most of the ranging station subsystems, the control computers remain a mix of 1970's vintage minicomputers. These encompass a wide range of vendors, operating systems, and languages, making hardware and software support increasingly difficult. Current technology allows replacement of controller computers at a relatively low cost while maintaining excellent processing power and a friendly operating environment. The new controller systems are now being designed using IBM-PC-compatible 80486-based microcomputers, a real-time Unix operating system (LynxOS), and X-windows/Motif IB, and serial interfaces have been chosen. This design supports minimizing short and long term costs by relying on proven standards for both hardware and software components. Currently, the project is in the design and prototyping stage with the first systems targeted for production in mid-1993.

  5. Upgrade of the Control System of the IFUNAM's Pelletron Accelerator

    CERN Document Server

    Macias, R; Ortiz, M E; López, K; Huerta, A; Verde, M C

    2001-01-01

    In 1995 a 9SDH-2 Pelletron from NEC was installed at IFUNAM (Instituto de Fisica, Universidad Nacional Autonoma de Mexico). Two beam lines have been operational since then and two new lines have been built. In order to perform the planned projects in this grown facility, an upgrading of the original manual control system is required. The proposed new control system takes advantage of the existing devices and incorporates the electronics needed for the newer beam lines. The control software from NEC, has been modified to accommodate the larger requirements. It runs on the same dedicated computer but receives commands from a new installed host. Both computers communicate through a local network sharing the accelerator database. The new host computer also handles all parameters related to the new lines. In the future, the old computer will be replaced in order to expand the possibilities of the system and use a friendlier graphical interface. In this work we present the changes made to the control software, the ...

  6. Sputtering System for QWR Cavity in BRIF Project

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>1 Introduction Four superconducting QWR cavities will be used in HI-13 tandem accelerator upgrade project (BRIF). These niobium coated cavities will be produced by CIAE. Up to now, a niobium sputtering

  7. Characterization of impurities in biogas before and after upgrading to vehicle fuel

    Energy Technology Data Exchange (ETDEWEB)

    Arrhenius, Karine; Johansson, Ulrika [SP Technical Research Institute of Sweden, Boraas (Sweden)

    2012-01-15

    Biogases produced by digesting organic wastes, residual sludge from waste water treatment, energy crops,byproducts from industry or in landfills contain impurities which can be harmful for components that will be in contact with the biogas during its utilization. In this project, the impurities present in biogases have been mapped out depending upon which feedstock is digested. P-cymene och D-limonene, two terpenes, have been found to be characteristics for biogases produced from the digestion of waste including household wastes while an 'oil' fraction containing alkanes with 9 to 13 carbon atoms is characteristic for biogases produced at waste water treatment plants. Ketones and sulfur compounds are found in biogases produced from the digestion of food industry wastes or energy crops. It was not possible to characterize impurities in biogases produced in farm plants digesting manure because not enough samples were analyzed from these plants. In order to understand the relation between the feedstock and the impurities present in the biogas, an extensive study on feedstock characterization must be conducted. One question to be answered is if these impurities only originate from the volatilization from the feedstock and in this case, why only these specific compounds are found at significant concentrations. In this study we have also studied how effective purification/upgrading techniques are to remove impurities that have been identified in biogases. En general comment is that the upgraded gas still contains a part of the characteristic impurities which have been identified for each feedstock at different levels of concentration depending on which technique has been used. The results show that activated carbon filters are more or less effective. Some of them can remove more than 90 % of the impurities while others remove less that 10 %. Results show also that the amine scrubber have very moderate effects on the impurities composition. In that case, the

  8. Prototypes and system test stands for the Phase1 upgrade of the CMS pixel detector

    CERN Document Server

    Hasegawa, Satoshi

    2015-01-01

    The CMS pixel phase-1 upgrade project replaces the current pixel detector with an upgraded system with faster readout electronics during the extended year-end technical stop of 2016/17. New electronics prototypes for the system have been developed, and tests in a realistic environment for a comprehensive evaluation are needed. A full readout test stand with either the same hardware as used in the current CMS pixel detector or the latest prototypes of upgrade electronics has been built. The setup enables the observation and investigation of a jitter increase in the data line as the trigger rate increase. This increase is due to the way in which the clock and trigger distribution is implemented in CMS. A new prototype of the electronics with a PLL based on a voltage controlled quartz crystal oscillator (QPLL), which works as jitter filter, in the clock distribution path was produced. With the test stand, it was confirmed that the jitter increase is not seen with the prototype, and also good performance was conf...

  9. Prototypes and system test stands for the Phase 1 upgrade of the CMS pixel detector

    Energy Technology Data Exchange (ETDEWEB)

    Hasegawa, S., E-mail: satoshi@fnal.gov

    2016-09-21

    The CMS pixel phase-1 upgrade project replaces the current pixel detector with an upgraded system with faster readout electronics during the extended year-end technical stop of 2016/2017. New electronics prototypes for the system have been developed, and tests in a realistic environment for a comprehensive evaluation are needed. A full readout test stand with either the same hardware as used in the current CMS pixel detector or the latest prototypes of upgrade electronics has been built. The setup enables the observation and investigation of a jitter increase in the data line associated with trigger rate increases. This effect is due to the way in which the clock and trigger distribution is implemented in CMS. A new prototype of the electronics with a PLL based on a voltage controlled quartz crystal oscillator (QPLL), which works as jitter filter, in the clock distribution path was produced. With the test stand, it was confirmed that the jitter increase is not seen with the prototype, and also good performance was confirmed at the expected detector operation temperature (−20 °C).

  10. Transforming the ASDEX Upgrade discharge control system to a general-purpose plasma control platform

    Energy Technology Data Exchange (ETDEWEB)

    Treutterer, Wolfgang, E-mail: Wolfgang.Treutterer@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Cole, Richard [Unlimited Computer Systems, Seeshaupter Str. 15, 82393 Iffeldorf (Germany); Gräter, Alexander [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Lüddecke, Klaus [Unlimited Computer Systems, Seeshaupter Str. 15, 82393 Iffeldorf (Germany); Neu, Gregor; Rapson, Christopher; Raupp, Gerhard; Zasche, Dieter; Zehetbauer, Thomas [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany)

    2015-10-15

    Highlights: • Control framework split in core and custom part. • Core framework deployable in other fusion device environments. • Adaptible through customizable modules, plug-in support and generic interfaces. - Abstract: The ASDEX Upgrade Discharge Control System DCS is a modern and mature product, originally designed to regulate and supervise ASDEX Upgrade Tokamak plasma operation. In its core DCS is based on a generic, versatile real-time software framework with a plugin architecture that allows to easily combine, modify and extend control function modules in order to tailor the system to required features and let it continuously evolve with the progress of an experimental fusion device. Due to these properties other fusion experiments like the WEST project have expressed interest in adopting DCS. For this purpose, essential parts of DCS must be unpinned from the ASDEX Upgrade environment by exposure or introduction of generalised interfaces. Re-organisation of DCS modules allows distinguishing between intrinsic framework core functions and device-specific applications. In particular, DCS must be prepared for deployment in different system environments with their own realisations for user interface, pulse schedule preparation, parameter server, time and event distribution, diagnostic and actuator systems, network communication and data archiving. The article explains the principles of the revised DCS structure, derives the necessary interface definitions and describes major steps to achieve the separation between general-purpose framework and fusion device specific components.

  11. TCS and peripheral robotization and upgrade on the ESO 1-meter telescope at La Silla Observatory

    Science.gov (United States)

    Ropert, S.; Suc, V.; Jordán, A.; Tala, M.; Liedtke, P.; Royo, S.

    2016-07-01

    In this work we describe the robotization and upgrade of the ESO 1m telescope located at La Silla Observatory. The ESO 1m telescope was the first telescope installed in La Silla, in 1966. It now hosts as a main instrument the FIber Dual EchellE Optical Spectrograph (FIDEOS), a high resolution spectrograph designed for precise Radial Velocity (RV) measurements on bright stars. In order to meet this project's requirements, the Telescope Control System (TCS) and some of its mechanical peripherals needed to be upgraded. The TCS was also upgraded into a modern and robust software running on a group of single board computers interacting together as a network with the CoolObs TCS developed by ObsTech. One of the particularities of the CoolObs TCS is that it allows to fuse the input signals of 2 encoders per axis in order to achieve high precision and resolution of the tracking with moderate cost encoders. One encoder is installed on axis at the telescope and the other on axis at the motor. The TCS was also integrated with the FIDEOS instrument system so that all the system can be controlled through the same remote user interface. Our modern TCS unit allows the user to run observations remotely through a secured internet web interface, minimizing the need of an on-site observer and opening a new age in robotic astronomy for the ESO 1m telescope.

  12. ATLAS IBL: a challenging first step for ATLAS Upgrade at the sLHC

    CERN Document Server

    La Rosa, Alessandro

    2011-01-01

    With the LHC collecting data at 7 TeV, plans are already advancing for a series of upgrades leading eventually to about five times the LHC design luminosity some 10 years from now in the High Luminosity LHC (HL-LHC) project. The upgrades for ATLAS detector will be staged in preparation for HL-LHC. The first upgrade for the Pixel detector will be the construction of a new pixel layer, which will be installed during the first shutdown of the LHC machine foreseen in 2013-14. The new detector, called the Insertable B-Layer (IBL) will be installed between the existing pixel detector and a new, smaller radius beam-pipe at the radius of 3.2 cm. The IBL will require the development of several new technologies to cope with increased radiation and pixel occupancy and also to improve the physics performance through reduction of the pixel size and more stringent material budget. Two different and promising Silicon sensor technologies (planar n-in-n and 3D) are currently under investigation for the IBL. An overview of the...

  13. ATLAS IBL: a challenging first step for ATLAS Upgrade at the sLHC.

    CERN Document Server

    La Rosa, A; The ATLAS collaboration

    2011-01-01

    With the LHC collecting data at 7 TeV, plans are already advancing for a series of upgrades leading eventually to about five times the LHC design luminosity some 10 years from now in the high luminosity LHC (HL-LHC) project. The upgrades for the ATLAS detector will be staged in preparation for HL-LHC. The first upgrade for the pixel detector will be the construction of a new pixel layer which will be installed during the first shutdown of the LHC machine foreseen in 2013-14. The new detector, called the Insertable B Layer (IBL) will be installed between the existing pixel detector and a new, smaller radius beam-pipe at a radius of 3.2 cm. The IBL will require the development of several new technologies to cope with increased radiation and pixel occupancy and also to improve the physics performance through reduction of the pixel size and a more stringent material budget. Two different and promising Silicon sensor technologies, planar n-in-n and 3D, are currently under investigation for the IBL. An overview of ...

  14. Prototypes and system test stands for the Phase 1 upgrade of the CMS pixel detector

    Science.gov (United States)

    Hasegawa, S.

    2016-09-01

    The CMS pixel phase-1 upgrade project replaces the current pixel detector with an upgraded system with faster readout electronics during the extended year-end technical stop of 2016/2017. New electronics prototypes for the system have been developed, and tests in a realistic environment for a comprehensive evaluation are needed. A full readout test stand with either the same hardware as used in the current CMS pixel detector or the latest prototypes of upgrade electronics has been built. The setup enables the observation and investigation of a jitter increase in the data line associated with trigger rate increases. This effect is due to the way in which the clock and trigger distribution is implemented in CMS. A new prototype of the electronics with a PLL based on a voltage controlled quartz crystal oscillator (QPLL), which works as jitter filter, in the clock distribution path was produced. With the test stand, it was confirmed that the jitter increase is not seen with the prototype, and also good performance was confirmed at the expected detector operation temperature (-20 °C).

  15. High brightness, high current injector design for the ATF upgrade at Brookhaven National Laboratory

    Science.gov (United States)

    Stratakis, Diktys

    2015-04-01

    Brookhaven National Accelerator Test Facility (BNL ATF) is in the process of moving to a new place and upgrading its major capabilities: The electron beam energy and CO2 laser power. Specifically, the maximum electron beam energy will be first projected to 100-150 MeV and then upgraded to 500 MeV while at the same time the laser power will increase 100 fold, thus making the new ATF a powerful tool in advanced accelerator concept research. The bright electron bunch produced by the new state-of-the-art photocathode rf gun will be accelerated and optionally delivered to multiple beamlines. The injector is a key element of this accelerator upgrade. It must deliver a high average current beam with very small transverse and longitudinal emittances, at a sufficiently high energy that space charge effects are under control. We review here the detailed injector design and present first results from beam dynamics simulations. We give emphasis in the production of compressed flat beams which have important applications in novel light-source concepts and could possibly alleviate the need for damping rings in lepton colliders. We present a theoretical model and with the aid of simulation examine the influence of space charge, bunch compression and suggest a operating regime with minimal phase space dilutions.

  16. High temperature ceramic membrane reactors for coal liquid upgrading. Quarterly report No. 10, December 21, 1991--March 20, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-07-01

    In this project we will study a novel process concept, i.e., the use of ceramic membrane reactors in upgrading of coal model compounds and coal derived liquids. In general terms, the USC research team is responsible for constructing and operating the membrane reactor apparatus and for testing various inorganic membranes for the upgrading of coal derived asphaltenes and coal model compounds. The USC effort will involve the principal investigator of this project and two graduate research assistants. The ALCOA team is responsible for the preparation of the inorganic membranes, for construction and testing of the ceramic membrane modules, and for measurement of their transport properties. The ALCOA research effort will involve Dr. Paul K. T. Liu, who is the project manager of the ALCOA research team, an engineer and a technician. UNOCAL`s contribution will be limited to overall technical assistance in catalyst preparation and the operation of the laboratory upgrading membrane reactor and for analytical back-up and expertise in oil analysis and materials characterization. UNOCAL is a no-cost contractor but will be involved in all aspects of the project, as deemed appropriate.

  17. A Critical Assessment of Microbiological Biogas to Biomethane Upgrading Systems.

    Science.gov (United States)

    Rittmann, Simon K-M R

    2015-01-01

    Microbiological biogas upgrading could become a promising technology for production of methane (CH(4)). This is, storage of irregular generated electricity results in a need to store electricity generated at peak times for use at non-peak times, which could be achieved in an intermediate step by electrolysis of water to molecular hydrogen (H(2)). Microbiological biogas upgrading can be performed by contacting carbon dioxide (CO(2)), H(2) and hydrogenotrophic methanogenic Archaea either in situ in an anaerobic digester, or ex situ in a separate bioreactor. In situ microbiological biogas upgrading is indicated to require thorough bioprocess development, because only low volumetric CH(4) production rates and low CH(4) fermentation offgas content have been achieved. Higher volumetric production rates are shown for the ex situ microbiological biogas upgrading compared to in situ microbiological biogas upgrading. However, the ex situ microbiological biogas upgrading currently suffers from H(2) gas liquid mass transfer limitation, which results in low volumetric CH(4) productivity compared to pure H(2)/CO(2) conversion to CH(4). If waste gas utilization from biological and industrial sources can be shown without reduction in volumetric CH(4) productivity, as well as if the aim of a single stage conversion to a CH(4) fermentation offgas content exceeding 95 vol% can be demonstrated, ex situ microbiological biogas upgrading with pure or enrichment cultures of methanogens could become a promising future technology for almost CO(2)-neutral biomethane production.

  18. Design upgrade of the ISOLDE target unit for HIE-ISOLDE

    Energy Technology Data Exchange (ETDEWEB)

    Montaño, J., E-mail: Jacobo.Montano@cern.ch [CERN, ISOLDE, CH-1211 Geneva 23 (Switzerland); Giles, T. [CERN, ISOLDE, CH-1211 Geneva 23 (Switzerland); Gottberg, A. [CERN, ISOLDE, CH-1211 Geneva 23 (Switzerland); Instituto de Estructura de la Materia, CSIC, 28006 Madrid (Spain)

    2013-12-15

    Highlights: • Requirements for a new target-source system for the radioactive facility HIE-ISOLDE. • For the upgraded facility a higher radiation field will be present. • The new design has to take into account the radiation field of the upgraded facility. -- Abstract: The High Intensity and Energy HIE-ISOLDE project is a major upgrade of the existing ISOLDE and REX-ISOLDE facilities with the objective of increasing the energy and the intensity of the delivered radioactive ion beams (RIB) [1]. In order to accommodate the future increase of primary beam intensity delivered by the new LINAC4 H{sup −} driver to the Proton Synchrotron Booster (PSB) [2] and from this to ISOLDE, a major study is being carried out to upgrade the existing designs of the ISOLDE target and its supporting infrastructure. In particular, the extraction optics plays an important role in the initial beam transport and the quality of the beam supplied to the mass separators. Important factors include the emittance of the beam and the beam profile to avoid beam losses. A new double electrode extraction system has been developed for simplifying and improving the interface between the target unit and the frontend (target coupling table). Numerical and experimental studies have been performed in order to define the new extraction geometry, and the coupling table has been adapted to keep the compatibility. An alternative heating system is under study. An electron bombardment heating system is being developed as an option for avoiding the employment of big cross section cables. The results of these studies and the mechanical models developed are presented and discussed.

  19. LHCb: A new Readout Control system for the LHCb Upgrade

    CERN Multimedia

    Alessio, F

    2012-01-01

    The LHCb experiment has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity. The entire readout architecture will be upgraded in order to cope with higher sub-detector occupancies, higher rate and higher network load. In this paper, we describe the architecture, functionalities and the first hardware implementation of a new Readout Control system for the LHCb upgrade. The system is based on FPGAs and bi-directional links for the control of the entire readout architecture. First results on the validation of the system are also given.

  20. Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, John Howard

    2014-09-09

    A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.