WorldWideScience

Sample records for rhic brookhaven national

  1. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  2. Brookhaven: RHIC magnets

    International Nuclear Information System (INIS)

    Heppelman, Steve

    1990-01-01

    Last year, Brookhaven's proposal for a Relativistic Heavy Ion Collider - RHIC - was scrutinized by the US Department of Energy and deemed to be ready for construction funding. The hope is that the money will be voted soon so that construction can get underway at the start of the new US financial year in October. The 3.8 kilometre RHIC tunnel was completed ten years ago for the doomed Isabelle/CBA proton collider project

  3. Brookhaven: Ready for RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Ludlam, Tom

    1990-04-15

    With its RHIC - Relativistic Heavy Ion Collider - project now part of the budget proposed by US President Bush for fiscal year 1991, Brookhaven is about to start construction of a unique kind of high energy collider. At a time when accelerators handling particles - electrons, protons and their antimatter counterparts - are boosting beam energies for microscopes to probe evershorter distances, RHIC is envisioned as a great pressure-cooker for strongly interacting matter.

  4. Brookhaven: Ready for RHIC

    International Nuclear Information System (INIS)

    Ludlam, Tom

    1990-01-01

    With its RHIC - Relativistic Heavy Ion Collider - project now part of the budget proposed by US President Bush for fiscal year 1991, Brookhaven is about to start construction of a unique kind of high energy collider. At a time when accelerators handling particles - electrons, protons and their antimatter counterparts - are boosting beam energies for microscopes to probe evershorter distances, RHIC is envisioned as a great pressure-cooker for strongly interacting matter

  5. RHIC and quark matter: proposal for a relativistic heavy ion collider at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    1984-08-01

    This document describes the Brookhaven National Laboratory Proposal for the construction of a Relativistic Heavy Ion Collider (RHIC). The construction of this facility represents the natural continuation of the laboratory's role as a center for nuclear and high-energy physics research and extends and uses the existing AGS, Tandem Van de Graaff and CBA facilities at BNL in a very cost effective manner. The Administration and Congress have approved a project which will provide a link between the Tandem Van de Graaf and the AGS. Completion of this project in 1986 will provide fixed target capabilities at the AGS for heavy ions of about 14 GeV/amu with masses up to approx. 30 (sulfur). The addition of an AGS booster would extend the mass range to the heaviest ions (A approx. 200, e.g., gold); its construction could start in 1986 and be completed in three years. These two new AGS experimental facilities can be combined with the proposed Relativistic Heavy Ion Collider to extend the energy range to 100 x 100 GeV/amu for the heaviest ions. BNL proposes to start construction of RHIC in FY 86 with completion in FY 90 at a total cost of 134 M$

  6. Heat leak testing of a superconducting RHIC dipole magnet at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    DeLalio, J.T.; Brown, D.P.; Sondericker, J.H.

    1993-01-01

    Brookhaven National Laboratory is currently performing heat load tests on a superconducting dipole magnet. The magnet is a prototype of the 360, 8 cm bore, arc dipole magnets that will be used in the Relativistic Heavy Ion Collider (RMC). An accurate measurement of the heat load is needed to eliminate cumulative errors when determining the REUC cryogenic system load requirements. The test setup consists of a dipole positioned between two quadrupoles in a common vacuum tank and heat shield. Piping and instrumentation are arranged to facilitate measurement of the heat load on the primary 4.6 K magnet load and the secondary 55 K heat shield load. Initial results suggest that the primary heat load is well below design allowances. The secondary load was found to be higher than estimated, but remained close to the budgeted amount. Overall, the dipole performed to specifications

  7. BROOKHAVEN: Major detectors for RHIC under construction

    International Nuclear Information System (INIS)

    Ludlam, Thomas W.

    1994-01-01

    On March 9-10, a cost and schedule review at Brookhaven verified construction readiness for the PHENIX detector (May 1993, page 10). PHENIX thus joins STAR (Solenoidal Tracking at RHIC - November 1991, page 17), whose construction plan was ratified in January 1993, as a major detector to take data when the RHIC heavy ion collider is completed in mid-1999. The goal of both detectors is to search for the transition from ordinary nuclear matter to a new state of matter consisting of (momentarily) unconfined quarks and gluons. This transition to a ''quark-gluon plasma'' (QGP) is predicted to occur under extreme conditions of temperature and energy density, as is likely to be the case in the collision of heavy ions of sufficient energy. RHIC is expected to produce the highest energy densities ever observed on the nuclear scale

  8. The Relativistic Heavy Ion Collider (RHIC) cryogenic system at Brookhaven National Laboratory: Review of the modifications and upgrades since 2002 and planned improvements

    International Nuclear Information System (INIS)

    Than, R.; Tuozzolo, Joseph; Sidi-Yekhlef, Ahmed; Ganni, Venkatarao; Knudsen, Peter; Arenius, Dana

    2008-01-01

    Brookhaven National Laboratory continues its multi-year program to improve the operational efficiency, reliability, and stability of the cryogenic system, which also resulted in an improved beam availability of the Relativistic Heavy Ion Collider (RHIC). This paper summarizes the work and changes made after each phase over the past four years to the present, as well as proposed future improvements. Power usage dropped from an initial 9.4 MW to the present 5.1 MW and is expected to drop below 5 MW after the completion of the remaining proposed improvements. The work proceeded in phases, balancing the Collider's schedule of operation, time required for the modifications and budget constraints. The main changes include process control, compressor oil removal and management, elimination of the use of cold compressors and two liquid-helium storage tanks, insulation of the third liquid-helium storage tank, compressor-bypass flow reduction and the addition of a load turbine (Joule-Thomson)

  9. Brookhaven highlights - Brookhaven National Laboratory 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This report highlights research conducted at Brookhaven National Laboratory in the following areas: alternating gradient synchrotron; physics; biology; national synchrotron light source; department of applied science; medical; chemistry; department of advanced technology; reactor; safety and environmental protection; instrumentation; and computing and communications.

  10. Accelerator timing at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Oerter, B.; Conkling, C.R.

    1995-01-01

    Accelerator timing at Brookhaven National Laboratory has evolved from multiple coaxial cables transmitting individual pulses in the original Alternating Gradient Synchrotron (AGS) design, to serial coded transmission as the AGS Booster was added. With the implementation of this technology, the Super Cycle Generator (SCG) which synchronizes the AGS, Booster, LINAC, and Tandem accelerators was introduced. This paper will describe the timing system being developed for the Relativistic Heavy Ion Collider (RHIC)

  11. Database activities at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Trahern, C.G.

    1995-01-01

    Brookhaven National Laboratory is a multi-disciplinary lab in the DOE system of research laboratories. Database activities are correspondingly diverse within the restrictions imposed by the dominant relational database paradigm. The authors discuss related activities and tools used in RHIC and in the other major projects at BNL. The others are the Protein Data Bank being maintained by the Chemistry department, and a Geographical Information System (GIS)--a Superfund sponsored environmental monitoring project under development in the Office of Environmental Restoration

  12. Brookhaven National Laboratory

    Science.gov (United States)

    ... For Vendors Departments Public Events Newsroom Technology Licensing Stakeholder Relations Students & Educators Sustainability Privacy and security notice Brookhaven Science Associates Brookhaven Science Associates manages ...

  13. RHIC: What We Have Learned So Far (434th Brookhaven Lecture)

    International Nuclear Information System (INIS)

    O'Brien, Edward

    2008-01-01

    One of the world's premiere nuclear research facilities, the Relativistic Heavy Ion Collider (RHIC) at Brookhaven Lab is just completing its eighth year of physics operation. During the past eight years, RHIC's primary physics program has emphasized the creation, observation and explanation of nuclear matter created at temperatures and densities that last existed in the universe some 13.7 billion years ago. RHIC was built to study the strong force, which holds quarks and gluons together within the nucleus of an atom, with the goal of observing a plasma of quarks and gluons freed from the atomic nucleus. The new state of matter that was created, however, was quite different. Dr. O'Brien will discuss what RHIC scientists expected versus what they discovered, and how this finding both challenges existing theory and provides an opportunity to understand the strong force better.

  14. Applied programs at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document overviews the areas of current research at Brookhaven National Laboratory. Technology transfer and the user facilities are discussed. Current topics are presented in the areas of applied physics, chemical science, material science, energy efficiency and conservation, environmental health and mathematics, biosystems and process science, oceanography, and nuclear energy. (GHH)

  15. Brookhaven highlights

    International Nuclear Information System (INIS)

    Rowe, M.S.; Belford, M.; Cohen, A.; Greenberg, D.; Seubert, L.

    1993-01-01

    This report highlights the research activities of Brookhaven National Laboratory during the period dating from October 1, 1992 through September 30, 1993. There are contributions to the report from different programs and departments within the laboratory. These include technology transfer, RHIC, Alternating Gradient Synchrotron, physics, biology, national synchrotron light source, applied science, medical science, advanced technology, chemistry, reactor physics, safety and environmental protection, instrumentation, and computing and communications

  16. The Brookhaven National Laboratory Accelerator Test Facility

    International Nuclear Information System (INIS)

    Batchelor, K.

    1992-01-01

    The Brookhaven National Laboratory Accelerator Test Facility comprises a 50 MeV traveling wave electron linear accelerator utilizing a high gradient, photo-excited, raidofrequency electron gun as an injector and an experimental area for study of new acceleration methods or advanced radiation sources using free electron lasers. Early operation of the linear accelerator system including calculated and measured beam parameters are presented together with the experimental program for accelerator physics and free electron laser studies

  17. Dr. Praveen Chaudhari named director of Brookhaven National Laboratory

    CERN Multimedia

    2003-01-01

    "Brookhaven Science Associates announced today the selection of Dr. Praveen Chaudhari as Director of the U.S. Department of Energy's Brookhaven National Laboratory. Dr. Chaudhari, who will begin his new duties on April 1, joins Brookhaven Lab after 36 years of distinguished service at IBM as a scientist and senior manager of research" (1 page).

  18. Relay testing at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.; Hofmayer, C.

    1989-01-01

    Brookhaven National Laboratory (BNL) is conducting a seismic test program on relays. The purpose of the test program is to investigate the influence of various designs, electrical and vibration parameters on the seismic capacity levels. The first series of testing has been completed and performed at Wyle Laboratories. The major part of the test program consisted of single axis, single frequency sine dwell tests. Random multiaxis, multifrequency tests were also performed. Highlights of the test results as well as a description of the testing methods are presented in this paper. 10 figs

  19. Brookhaven National Laboratory site environmental report for calendar year 1994

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Royce, B.A. [eds.

    1995-05-01

    This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory.

  20. Brookhaven National Laboratory site environmental report for calendar year 1994

    International Nuclear Information System (INIS)

    Naidu, J.R.; Royce, B.A.

    1995-05-01

    This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory's operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory

  1. BROOKHAVEN

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Neutrino physics has been an integral part of the Brookhaven research programme for much of the Laboratory's 46-year history. Milestones have been the determination of the helicity of neutrinos (1958), the establishment of the existence of two kinds of neutrinos (1962) for which Leon Lederman, Mel Schwartz and Jack Steinberger were awarded the 1988 Nobel Physics Prize, the discovery of charmed baryons in the 7' Bubble Chamber in 1975, and the ongoing measurements by Ray Davis and collaborators of solar neutrinos, first reported in 1968. There have also been significant contributions to the understanding of neutral currents in exclusive hadron and electron channels. In addition some of the earliest, and to date best, accelerator limits on electron muon neutrino oscillations are from Brookhaven experiments. The Laboratory is also the 'B' in the IMB underground experiment, built to search for proton decay and which caught neutrinos from the SN 1987a supernova. At present Brookhaven is heavily involved in the Gallex project in the Gran Sasso and recently a new collaboration has received scientific approval for a long baseline experiment to search for muon neutrino oscillations via muon neutrino disappearance

  2. Testing of a cryogenic recooler heat exchanger at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Nicoletti, A.; Wu, K.C.

    1993-01-01

    Brookhaven National Laboratory has tested a recooler heat exchanger intended to be used in the cryogenic system of the Relativistic Heavy Ion Collider. The unit is required to transfer 225 Watts from a supercritical helium stream flowing at 100 g/s to a helium bath boiling at 4.25 K. Measurements made with heat loads of 50 to over 450 Watts on the unit indicate its cooling capacity is greater than 400 Watts, as expected, and it will be suitable for use in the RHIC ring. Presented are the modifications made to BNL's MAGCOOL test facility that were necessary for testing, test procedure, and recooler performance

  3. Laser ion source with solenoid for Brookhaven National Laboratory-electron beam ion source.

    Science.gov (United States)

    Kondo, K; Yamamoto, T; Sekine, M; Okamura, M

    2012-02-01

    The electron beam ion source (EBIS) preinjector at Brookhaven National Laboratory (BNL) is a new heavy ion-preinjector for relativistic heavy ion collider (RHIC) and NASA Space Radiation Laboratory (NSRL). Laser ion source (LIS) is a primary ion source provider for the BNL-EBIS. LIS with solenoid at the plasma drift section can realize the low peak current (∼100 μA) with high charge (∼10 nC) which is the BNL-EBIS requirement. The gap between two solenoids does not cause serious plasma current decay, which helps us to make up the BNL-EBIS beamline.

  4. Laser ion source with solenoid for Brookhaven National Laboratory-electron beam ion source

    International Nuclear Information System (INIS)

    Kondo, K.; Okamura, M.; Yamamoto, T.; Sekine, M.

    2012-01-01

    The electron beam ion source (EBIS) preinjector at Brookhaven National Laboratory (BNL) is a new heavy ion-preinjector for relativistic heavy ion collider (RHIC) and NASA Space Radiation Laboratory (NSRL). Laser ion source (LIS) is a primary ion source provider for the BNL-EBIS. LIS with solenoid at the plasma drift section can realize the low peak current (∼100 μA) with high charge (∼10 nC) which is the BNL-EBIS requirement. The gap between two solenoids does not cause serious plasma current decay, which helps us to make up the BNL-EBIS beamline.

  5. Laser ion source with solenoid for Brookhaven National Laboratory-electron beam ion sourcea)

    Science.gov (United States)

    Kondo, K.; Yamamoto, T.; Sekine, M.; Okamura, M.

    2012-02-01

    The electron beam ion source (EBIS) preinjector at Brookhaven National Laboratory (BNL) is a new heavy ion-preinjector for relativistic heavy ion collider (RHIC) and NASA Space Radiation Laboratory (NSRL). Laser ion source (LIS) is a primary ion source provider for the BNL-EBIS. LIS with solenoid at the plasma drift section can realize the low peak current (˜100 μA) with high charge (˜10 nC) which is the BNL-EBIS requirement. The gap between two solenoids does not cause serious plasma current decay, which helps us to make up the BNL-EBIS beamline.

  6. Brookhaven National Laboratory site environmental report for calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Schroeder, G.L.; Paquette, D.E.; Naidu, J.R.; Lee, R.J.; Briggs, S.L.K.

    1998-01-01

    This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1996. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and non-radiological emissions and effluents to the environment.

  7. Landmarks in particle physics at Brookhaven National Laboratory: Brookhaven Lecture Series, Number 238

    International Nuclear Information System (INIS)

    Adair, R.K.

    1987-01-01

    Robert Adair's lecture on Landmarks in Particle Physics at Brookhaven National Laboratory (BNL) is a commemoration of the 40th Anniversary of Brookhaven National Laboratory. Adair describes ten researches in elementary particle physics at Brookhaven that had a revolutionary impact on the understanding of elementary particles. Two of the discoveries were made in 1952 and 1956 at the Cosmotron, BNL's first proton accelerator. Four were made in 1962 and 1964 at the Alternating Gradient Synchrotron, the Cosmotron's replacement. Two other discoveries in 1954 and 1956 were theoretical, and strong focusing (1952) is the only technical discovery. One discovery (1958) happened in an old barrack. Four of the discoveries were awarded the Nobel prize in Physics. Adair believes that all of the discoveries are worthy of the Nobel prize. 14 figs

  8. Brookhaven National Laboratory electron beam test stand

    International Nuclear Information System (INIS)

    Pikin, A.; Alessi, J.; Beebe, E.; Kponou, A.; Prelec, K.; Snydstrup, L.

    1998-01-01

    The main purpose of the electron beam test stand (EBTS) project at the Brookhaven National Laboratory is to build a versatile device to develop technologies that are relevant for a high intensity electron beam ion source (EBIS) and to study the physics of ion confinement in a trap. The EBTS will have all the main attributes of EBIS: a 1-m-long, 5 T superconducting solenoid, electron gun, drift tube structure, electron collector, vacuum system, ion injection system, appropriate control, and instrumentation. Therefore it can be considered a short prototype of an EBIS for a relativistic heavy ion collider. The drift tube structure will be mounted in a vacuum tube inside a open-quotes warmclose quotes bore of a superconducting solenoid, it will be at room temperature, and its design will employ ultrahigh vacuum technology to reach the 10 -10 Torr level. The first gun to be tested will be a 10 A electron gun with high emission density and magnetic compression of the electron beam. copyright 1998 American Institute of Physics

  9. Nuclear medicine at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Atkins, H.L.

    1976-01-01

    The Nuclear Medicine Program at the Brookhaven National Laboratory seeks to develop new materials and methods for the investigation of human physiology and disease processes. Some aspects of this research are related to basic research of how radiopharmaceuticals work. Other aspects are directed toward direct applications as diagnostic agents. It is likely that cyclotron-produced positron emitting nuclides will assume greater importance in the next few years. This can be attributed to the ability to label biologically important molecules with high specific activity without affecting biological activity, using 11 C, 13 N, and 15 O. Large quantities of these short-lived nuclides can be administered without excessive radiation dose and newer instrumentation will permit reconstructive axial tomography, providing truly quantitative display of distribution of radioactivity. The 122 Xe- 122 I generator has the potential for looking at rapid dynamic processes. Another generator, the 68 Ge- 68 Ga generator produces a positron emitter for the use of those far removed from cyclotrons. The possibilities for 68 Ga radiopharmaceuticals are as numerous as those for /sup 99m/Tc diagnostic agents

  10. Geothermal materials development at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Kukacka, L.E. [Brookhaven National Lab., Upton, NY (United States)

    1997-12-31

    As part of the DOE/OGT response to recommendations and priorities established by industrial review of their overall R&D program, the Geothermal Materials Program at Brookhaven National Laboratory (BNL) is focusing on topics that can reduce O&M costs and increase competitiveness in foreign and domestic markets. Corrosion and scale control, well completion materials, and lost circulation control have high priorities. The first two topics are included in FY 1997 BNL activities, but work on lost circulation materials is constrained by budgetary limitations. The R&D, most of which is performed as cost-shared efforts with U.S. geothermal firms, is rapidly moving into field testing phases. FY 1996 and 1997 accomplishments in the development of lightweight CO{sub 2}-resistant cements for well completions; corrosion resistant, thermally conductive polymer matrix composites for heat exchange applications; and metallic, polymer and ceramic-based corrosion protective coatings are given in this paper. In addition, plans for work that commenced in March 1997 on thermally conductive cementitious grouting materials for use with geothermal heat pumps (GHP), are discussed.

  11. Polarized proton collider at RHIC

    International Nuclear Information System (INIS)

    Alekseev, I.; Allgower, C.; Bai, M.; Batygin, Y.; Bozano, L.; Brown, K.; Bunce, G.; Cameron, P.; Courant, E.; Erin, S.; Escallier, J.; Fischer, W.; Gupta, R.; Hatanaka, K.; Huang, H.; Imai, K.; Ishihara, M.; Jain, A.; Lehrach, A.; Kanavets, V.; Katayama, T.; Kawaguchi, T.; Kelly, E.; Kurita, K.; Lee, S.Y.; Luccio, A.; MacKay, W.W.; Mahler, G.; Makdisi, Y.; Mariam, F.; McGahern, W.; Morgan, G.; Muratore, J.; Okamura, M.; Peggs, S.; Pilat, F.; Ptitsin, V.; Ratner, L.; Roser, T.; Saito, N.; Satoh, H.; Shatunov, Y.; Spinka, H.; Syphers, M.; Tepikian, S.; Tominaka, T.; Tsoupas, N.; Underwood, D.; Vasiliev, A.; Wanderer, P.; Willen, E.; Wu, H.; Yokosawa, A.; Zelenski, A.N.

    2003-01-01

    In addition to heavy ion collisions (RHIC Design Manual, Brookhaven National Laboratory), RHIC will also collide intense beams of polarized protons (I. Alekseev, et al., Design Manual Polarized Proton Collider at RHIC, Brookhaven National Laboratory, 1998, reaching transverse energies where the protons scatter as beams of polarized quarks and gluons. The study of high energy polarized protons beams has been a long term part of the program at BNL with the development of polarized beams in the Booster and AGS rings for fixed target experiments. We have extended this capability to the RHIC machine. In this paper we describe the design and methods for achieving collisions of both longitudinal and transverse polarized protons in RHIC at energies up to √s=500 GeV

  12. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  13. Theoretical Status of the RHIC Program

    International Nuclear Information System (INIS)

    Jalilian-Marian, Jamal

    2006-01-01

    Since the beginning of its operation, the Relativistic Heavy Ion Collider (RHIC) at the Brookhaven National Lab has produced a wealth of exciting and interesting results. I give a brief overview of the theoretical aspects of the main results from the RHIC program

  14. RF Beam control system for the Brookhaven relativistic heavy ion collider, RHIC

    International Nuclear Information System (INIS)

    Brennan, J.M.; Campbell, A.; Delong, J.; Hayes, T.; Onillon, E.; Rose, J.; Vetter, K.

    1998-01-01

    The Relativistic Heavy Ion Collider, RHIC, is two counter-rotating rings with six interaction points. The RF Beam Control system for each ring will control two 28 MHz cavities for acceleration, and five 197 MHz cavities for preserving the 5 ns bunch length during 10 hour beam stores. Digital technology is used extensively in: Direct Digital Synthesis of rf signals and Digital Signal Processing for, the realization of state-variable feedback loops, real-time calculation of rf frequency, and bunch-by-bunch phase measurement of the 120 bunches. DSP technology enables programming the parameters of the feedback loops in order to obtain closed-loop dynamics that are independent of synchrotron frequency

  15. RF beam control system for the Brookhaven Relativistic Heavy Ion Collider, RHIC

    International Nuclear Information System (INIS)

    Brennan, J.M.; Campbell, A.; DeLong, J.; Hayes, T.; Onillon, E.; Rose, J.; Vetter, K.

    1998-01-01

    The Relativistic Heavy Ion Collider, RHIC, is two counter-rotating rings with six interaction points. The RF Beam Control system for each ring will control two 28 MHz cavities for acceleration, and five 197 MHz cavities for preserving the 5 ns bunch length during 10 hour beam stores. Digital technology is used extensively in: Direct Digital Synthesis of rf signals and Digital Signal Processing for, the realization of state-variable feedback loops, real-time calculation of rf frequency, and bunch-by-bunch phase measurement of the 120 bunches. DSP technology enables programming the parameters of the feedback loops in order to obtain closed-loop dynamics that are independent of synchrotron frequency

  16. Exploring new frontiers in nuclear and particle physics with the STAR detector at RHIC

    International Nuclear Information System (INIS)

    Hallman, T.J.

    1996-01-01

    The Solenoidal Tracker At RHIC (STAR) is a large acceptance collider detector scheduled to begin operation at the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory in the fall of 1999. In the sections which follow, details of the STAR detector and physics program, as well as the status of the RHIC construction project will be presented

  17. Physics and experiments at RHIC

    International Nuclear Information System (INIS)

    Young, G.R.

    1995-01-01

    The Relativistic Heavy Ion Collider (RHIC), under construction at Brookhaven National Laboratory, will be the site of a series of experiments seeking to discover the quark-gluon plasma and elucidate its properties. Several observables should exhibit characteristic behaviors if a quark-gluon plasma is indeed created in the laboratory. Four experiments are now under construction for RHIC to measure certain of these observables over kinematic ranges where effects due to quark-gluon plasma formation should be manifest

  18. Brookhaven National Laboratory site environmental report for calendar year 1995

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Paquette, D.E.; Schroeder, G.L. [eds.] [and others

    1996-12-01

    This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1995. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment. Areas of known contamination are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement established by the Department of Energy, Environmental Protection Agency and the New York Department of Environmental Conservation. Except for identified areas of soil and groundwater contamination, the environmental monitoring data has continued to demonstrate that compliance was achieved with the applicable environmental laws and regulations governing emission and discharge of materials to the environment. Also, the data show that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public nor to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

  19. Brookhaven National Laboratory moves to the fast lane

    CERN Multimedia

    2006-01-01

    "The U.S. Department of Energy's energy sciences network (ESnet) continues to roll out its next-generation architecture on schedule with the March 14 completion of the Long Island Metropolitan Area Network, connecting Brookhaven National Laboratory (BNL) to the ESnet point of presente (PO) 60 miles away in New York City." (1 page)

  20. Brookhaven highlights

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, M.S.; Cohen, A.; Greenberg, D.; Seubert, L. (eds.)

    1992-01-01

    This publication provides a broad overview of the research programs and efforts being conducted, built, designed, and planned at Brookhaven National Laboratory. This work covers a broad range of scientific disciplines. Major facilities include the Alternating Gradient Synchrotron (AGS), with its newly completed booster, the National Synchrotron Light Source (NSLS), the High Flux Beam Reactor (HFBR), and the RHIC, which is under construction. Departments within the laboratory include the AGS department, accelerator development, physics, chemistry, biology, NSLS, medical, nuclear energy, and interdepartmental research efforts. Research ranges from the pure sciences, in nuclear physics and high energy physics as one example, to environmental work in applied science to study climatic effects, from efforts in biology which are a component of the human genome project to the study, production, and characterization of new materials. The paper provides an overview of the laboratory operations during 1992, including staffing, research, honors, funding, and general laboratory plans for the future.

  1. Brookhaven highlights

    International Nuclear Information System (INIS)

    Rowe, M.S.; Cohen, A.; Greenberg, D.; Seubert, L.

    1992-01-01

    This publication provides a broad overview of the research programs and efforts being conducted, built, designed, and planned at Brookhaven National Laboratory. This work covers a broad range of scientific disciplines. Major facilities include the Alternating Gradient Synchrotron (AGS), with its newly completed booster, the National Synchrotron Light Source (NSLS), the High Flux Beam Reactor (HFBR), and the RHIC, which is under construction. Departments within the laboratory include the AGS department, accelerator development, physics, chemistry, biology, NSLS, medical, nuclear energy, and interdepartmental research efforts. Research ranges from the pure sciences, in nuclear physics and high energy physics as one example, to environmental work in applied science to study climatic effects, from efforts in biology which are a component of the human genome project to the study, production, and characterization of new materials. The paper provides an overview of the laboratory operations during 1992, including staffing, research, honors, funding, and general laboratory plans for the future

  2. High density matter at RHIC

    Indian Academy of Sciences (India)

    QCD predicts a phase transition between hadronic matter and a quark-gluon plasma at high energy density. The relativistic heavy ion collider (RHIC) at Brookhaven National Laboratory is a new facility dedicated to the experimental study of matter under extreme conditions. Already the first round of experimental results at ...

  3. Brookhaven National Laboratory's multiparticle spectrometer drift chamber system

    International Nuclear Information System (INIS)

    Etkin, A.; Kramer, M.A.

    1979-01-01

    A system of drift chambers is being built to replace the present spark chambers in the Brookhaven National Laboratory's Multiparticle Spectrometer. This system will handle a beam of approx. 3 million particles per second and have a resolution of 200 μm. A summary of the status of the chambers and the custom integrated circuits is presented. The data acquisition system is described. Prototype chambers have been built and tested with results that are consistent with the expected chamber properties

  4. The Fiftieth Anniversary of Brookhaven National Laboratory: A Turbulent Time

    Science.gov (United States)

    Bond, Peter D.

    2018-03-01

    The fiftieth anniversary year of Brookhaven National Laboratory was momentous, but for reasons other than celebrating its scientific accomplishments. Legacy environmental contamination, community unrest, politics, and internal Department of Energy issues dominated the year. It was the early days of perhaps the most turbulent time in the lab's history. The consequences resulted in significant changes at the lab, but in addition they brought a change to contracts to manage the Department of Energy laboratories.

  5. BROOKHAVEN NATIONAL LABORATORY INSTITUTIONAL PLAN FY2003-2007.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-10

    This document presents the vision for Brookhaven National Laboratory (BNL) for the next five years, and a roadmap for implementing that vision. Brookhaven is a multidisciplinary science-based laboratory operated for the U.S. Department of Energy (DOE), supported primarily by programs sponsored by the DOE's Office of Science. As the third-largest funding agency for science in the U.S., one of the DOE's goals is ''to advance basic research and the instruments of science that are the foundations for DOE's applied missions, a base for U.S. technology innovation, and a source of remarkable insights into our physical and biological world, and the nature of matter and energy'' (DOE Office of Science Strategic Plan, 2000 http://www.osti.gov/portfolio/science.htm). BNL shapes its vision according to this plan.

  6. BROOKHAVEN NATIONAL LABORATORY SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1994.

    Energy Technology Data Exchange (ETDEWEB)

    NAIDU,J.R.; ROYCE,B.A.

    1995-05-01

    This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory's operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory. Brookhaven National Laboratory's compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment were evaluated. Among the permitted facilities, two instances of pH exceedances were observed at recharge basins, possibly related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant to the Peconic River exceeded. on ten occasions, one each for fecal coliform and 5-day Biochemical Oxygen Demand (avg.) and eight for ammonia nitrogen. The ammonia and Biochemical Oxygen Demand exceedances were attributed to the cold winter and the routine cultivation of the sand filter beds which resulted in the hydraulic overloading of the filter beds and the possible destruction of nitrifying bacteria. The on-set of warm weather and increased aeration of the filter beds via cultivation helped to alleviate this condition. The discharge of fecal coliform may also be linked to this occurrence, in that the increase in fecal coliform coincided with the increased cultivation of the sand filter beds. The environmental monitoring data has identified site-specific contamination of groundwater and soil. These areas are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement. Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with

  7. ELECTRON COOLING FOR RHIC

    International Nuclear Information System (INIS)

    Ben-Zvi, I.

    2001-01-01

    The Accelerator Collider Department (CAD) at Brookhaven National Laboratory is operating the Relativistic Heavy Ion Collider (RHIC), which includes the dual-ring, 3.834 km circumference superconducting collider and the venerable AGS as the last part of the RHIC injection chain. CAD is planning on a luminosity upgrade of the machine under the designation RHIC II. One important component of the RHIC II upgrade is electron cooling of RHIC gold ion beams. For this purpose, BNL and the Budker Institute of Nuclear Physics in Novosibirsk entered into a collaboration aimed initially at the development of the electron cooling conceptual design, resolution of technical issues, and finally extend the collaboration towards the construction and commissioning of the cooler. Many of the results presented in this paper are derived from the Electron Cooling for RHIC Design Report [1], produced by the, BINP team within the framework of this collaboration. BNL is also collaborating with Fermi National Laboratory, Thomas Jefferson National Accelerator Facility and the University of Indiana on various aspects of electron cooling

  8. ELECTRON COOLING FOR RHIC.

    Energy Technology Data Exchange (ETDEWEB)

    BEN-ZVI,I.

    2001-05-13

    The Accelerator Collider Department (CAD) at Brookhaven National Laboratory is operating the Relativistic Heavy Ion Collider (RHIC), which includes the dual-ring, 3.834 km circumference superconducting collider and the venerable AGS as the last part of the RHIC injection chain. CAD is planning on a luminosity upgrade of the machine under the designation RHIC II. One important component of the RHIC II upgrade is electron cooling of RHIC gold ion beams. For this purpose, BNL and the Budker Institute of Nuclear Physics in Novosibirsk entered into a collaboration aimed initially at the development of the electron cooling conceptual design, resolution of technical issues, and finally extend the collaboration towards the construction and commissioning of the cooler. Many of the results presented in this paper are derived from the Electron Cooling for RHIC Design Report [1], produced by the, BINP team within the framework of this collaboration. BNL is also collaborating with Fermi National Laboratory, Thomas Jefferson National Accelerator Facility and the University of Indiana on various aspects of electron cooling.

  9. Brookhaven National Laboratory Institutional Plan FY2001--FY2005

    Energy Technology Data Exchange (ETDEWEB)

    Davis, S.

    2000-10-01

    Brookhaven National Laboratory is a multidisciplinary laboratory in the Department of Energy National Laboratory system and plays a lead role in the DOE Science and Technology mission. The Laboratory also contributes to the DOE missions in Energy Resources, Environmental Quality, and National Security. Brookhaven strives for excellence in its science research and in facility operations and manages its activities with particular sensitivity to environmental and community issues. The Laboratory's programs are aligned continuously with the goals and objectives of the DOE through an Integrated Planning Process. This Institutional Plan summarizes the portfolio of research and capabilities that will assure success in the Laboratory's mission in the future. It also sets forth BNL strategies for our programs and for management of the Laboratory. The Department of Energy national laboratory system provides extensive capabilities in both world class research expertise and unique facilities that cannot exist without federal support. Through these national resources, which are available to researchers from industry, universities, other government agencies and other nations, the Department advances the energy, environmental, economic and national security well being of the US, provides for the international advancement of science, and educates future scientists and engineers.

  10. Science with multiply-charged ions at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Jones, K.W.; Johnson, B.M.; Meron, M.; Thieberger, P.

    1987-01-01

    The production of multiply-charged heavy ions at Brookhaven National Laboratory and their use in different types of experiments are discussed. The main facilities that are used are the Double MP Tandem Van de Graaff and the National Synchrotron Light Source. The capabilities of a versatile Atomic Physics Facility based on a combination of the two facilities and a possible new heavy-ion storage ring are summarized. It is emphasized that the production of heavy ions and the relevant science necessitates very flexible and diverse apparatus

  11. Proceedings of Brookhaven National Laboratory's fusion/synfuel workshop

    International Nuclear Information System (INIS)

    Fillo, J.A.; Powell, J.R.

    1979-01-01

    The fusion synfuels workshop held at Brookhaven National Laboratory (BNL) on August 27-29, 1979 examined the current status of candidate synfuel processes and the R and D required to develop the capability for fusion synfuel production. Participants divided into five working groups, covering the following areas: (1) economics and applications; (2) high-temperature electrolysis; (3) thermochemical processes (including hybrid thermo-electrochemical); (4) blanket and materials; and (5) high-efficiency power cycles. Each working group presented a summary of their conclusions and recommendations to all participants during the third day of the Workshop. These summaries are given

  12. Brookhaven National Laboratory site report for calendar year 1988

    Energy Technology Data Exchange (ETDEWEB)

    Miltenberger, R.P.; Royce, B.A.; Naidu, J.R.

    1989-06-01

    Brookhaven National Laboratory (BNL) is managed by Associated Universities Inc. (AUI). AUI was formed in 1946 by a group of nine universities whose purpose was to create and manage a laboratory in the Northeast in order to advance scientific research in areas of interest to universities, industry, and government. On January 31, 1947, the contract for BNL was approved by the Manhattan District of the Army Corps of Engineers and BNL was established on the former Camp Upton army camp. 54 refs., 21 figs., 78 tabs.

  13. Brookhaven National Laboratory site environmental report for calendar year 1991

    International Nuclear Information System (INIS)

    Naidu, J.R.; Royce, B.A.; Miltenberger, R.P.

    1992-09-01

    This publication presents the results of BNL's environmental monitoring and compliance effort and provides an assessment of the impact of Brookhaven National Laboratory (BNL) operations on the environment. This document is the responsibility of the Environmental Protection Section of the Safety and Envirorunental Protection Division. Within this Section, the Environmental Monitoring Group (EMG) sample the environment, interpreted the results, performed the impact analysis of the emissions from BNL, and compiled the information presented here. In this effort, other groups of the Section: Compliance; Analytical; Ground Water; and Quality played a key role in addressing the regulatory aspects and the analysis and documentation of the data, respectively

  14. Brookhaven National Laboratory site report for calendar year 1988

    International Nuclear Information System (INIS)

    Miltenberger, R.P.; Royce, B.A.; Naidu, J.R.

    1989-06-01

    Brookhaven National Laboratory (BNL) is managed by Associated Universities Inc. (AUI). AUI was formed in 1946 by a group of nine universities whose purpose was to create and manage a laboratory in the Northeast in order to advance scientific research in areas of interest to universities, industry, and government. On January 31, 1947, the contract for BNL was approved by the Manhattan District of the Army Corps of Engineers and BNL was established on the former Camp Upton army camp. 54 refs., 21 figs., 78 tabs

  15. Brookhaven National Laboratory site environmental report for calendar year 1990

    Energy Technology Data Exchange (ETDEWEB)

    Miltenberger, R.P.; Royce, B.A.; Naidu, J.R.

    1992-01-01

    Brookhaven National Laboratory (BNL) carries out basic and applied research in the following fields: high-energy nuclear and solid state physics; fundamental material and structure properties and the interactions of matter; nuclear medicine, biomedical and environmental sciences; and selected energy technologies. In conducting these research activities, it is Laboratory policy to protect the health and safety of employees and the public, and to minimize the impact of BNL operations on the environment. This document is the BNL environmental report for the calendar year 1990 for the safety and Environmental Protection division and corners topics on effluents, surveillance, regulations, assessments, and compliance.

  16. Brookhaven National Laboratory site environmental report for calendar year 1991

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Royce, B.A.; Miltenberger, R.P.

    1992-09-01

    This publication presents the results of BNL's environmental monitoring and compliance effort and provides an assessment of the impact of Brookhaven National Laboratory (BNL) operations on the environment. This document is the responsibility of the Environmental Protection Section of the Safety and Envirorunental Protection Division. Within this Section, the Environmental Monitoring Group (EMG) sample the environment, interpreted the results, performed the impact analysis of the emissions from BNL, and compiled the information presented here. In this effort, other groups of the Section: Compliance; Analytical; Ground Water; and Quality played a key role in addressing the regulatory aspects and the analysis and documentation of the data, respectively.

  17. Brookhaven National Laboratory site environmental report for calendar year 1991

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Royce, B.A.; Miltenberger, R.P.

    1992-09-01

    This publication presents the results of BNL`s environmental monitoring and compliance effort and provides an assessment of the impact of Brookhaven National Laboratory (BNL) operations on the environment. This document is the responsibility of the Environmental Protection Section of the Safety and Envirorunental Protection Division. Within this Section, the Environmental Monitoring Group (EMG) sample the environment, interpreted the results, performed the impact analysis of the emissions from BNL, and compiled the information presented here. In this effort, other groups of the Section: Compliance; Analytical; Ground Water; and Quality played a key role in addressing the regulatory aspects and the analysis and documentation of the data, respectively.

  18. Brookhaven National Laboratory site environmental report for calendar year 1990

    International Nuclear Information System (INIS)

    Miltenberger, R.P.; Royce, B.A.; Naidu, J.R.

    1992-01-01

    Brookhaven National Laboratory (BNL) carries out basic and applied research in the following fields: high-energy nuclear and solid state physics; fundamental material and structure properties and the interactions of matter; nuclear medicine, biomedical and environmental sciences; and selected energy technologies. In conducting these research activities, it is Laboratory policy to protect the health and safety of employees and the public, and to minimize the impact of BNL operations on the environment. This document is the BNL environmental report for the calendar year 1990 for the safety and Environmental Protection division and corners topics on effluents, surveillance, regulations, assessments, and compliance

  19. 1995 Annual epidemiologic surveillance report for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The US Department of Energy`s (DOE) conduct of epidemiologic surveillance provides an early warning system for health problems among workers. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report summarizes epidemiologic surveillance data collected from Brookhaven National Laboratory (BNL) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at BNL and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  20. The High Flux Beam Reactor at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Shapiro, S.M.

    1994-01-01

    Brookhaven National Laboratory's High Flux Beam Reactor (HFBR) was built because of the need of the scientist to always want 'more'. In the mid-50's the Brookhaven Graphite reactor was churning away producing a number of new results when the current generation of scientists, led by Donald Hughes, realized the need for a high flux reactor and started down the political, scientific and engineering path that led to the BFBR. The effort was joined by a number of engineers and scientists among them, Chemick, Hastings, Kouts, and Hendrie, who came up with the novel design of the HFBR. The two innovative features that have been incorporated in nearly all other research reactors built since are: (i) an under moderated core arrangement which enables the thermal flux to peak outside the core region where beam tubes can be placed, and (ii) beam tubes that are tangential to the core which decrease the fast neutron background without affecting the thermal beam intensity. Construction began in the fall of 1961 and four years later, at a cost of $12 Million, criticality was achieved on Halloween Night, 1965. Thus began 30 years of scientific accomplishments

  1. Monolithic circuit development for RHIC at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Alley, G.T.; Britton, C.L. Jr.; Kennedy, E.J.; Newport, D.F.; Wintenberg, A.L.; Young, G.R. [Oak Ridge National Laboratory, TN (United States)

    1991-12-31

    The work performed for RHIC at Oak Ridge National Laboratory during FY 91 is presented in this paper. The work includes preamplifier, analog memory, and analog-digital converter development for Dimuon Pad Readout, and evaluation and development of preamplifier-shapers for silicon strip readout. The approaches for implementation are considered as well as measured data for the various circuits that have been developed.

  2. Conceptual design of a quadrupole magnet for eRHIC

    Energy Technology Data Exchange (ETDEWEB)

    Witte, H. [Brookhaven National Lab. (BNL), Upton, NY (United States); Berg, J. S. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-05-03

    eRHIC is a proposed upgrade to the existing Relativistic Heavy Ion Collider (RHIC) hadron facility at Brookhaven National Laboratory, which would allow collisions of up to 21 GeV polarized electrons with a variety of species from the existing RHIC accelerator. eRHIC employs an Energy Recovery Linac (ERL) and an FFAG lattice for the arcs. The arcs require open-midplane quadrupole magnets of up to 30 T/m gradient of good field quality. In this paper we explore initial quadrupole magnet design concepts based on permanent magnetic material which allow to modify the gradient during operation.

  3. Deriving cleanup guidelines for radionuclides at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

    1997-01-01

    Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL`s Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory. With the exception of radium, there are no regulations or guidelines to establish cleanup guidelines for radionuclides in soils at BNL. BNL must derive radionuclide soil cleanup guidelines for a number of Operable Units (OUs) and Areas of Concern (AOCs). These guidelines are required by DOE under a proposed regulation for radiation protection of public health and the environment as well as to satisfy the requirements of CERCLA. The objective of this report is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL. Implementation of the approach is briefly discussed.

  4. Summary of failure analysis activities at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Cowgill, M.G.; Czajkowski, C.J.; Franz, E.M.

    1996-10-01

    Brookhaven National Laboratory has for many years conducted examinations related to the failures of nuclear materials and components. These examinations included the confirmation of root cause analyses, the determination of the causes of failure, identification of the species that accelerate corrosion, and comparison of the results of nondestructive examinations with those obtained by destructive examination. The results of those examinations, which had previously appeared in various formats (formal and informal reports, journal articles, etc.), have been collected together and summarized in the present report. The report is divided into sections according to the general subject matter (for example, corrosion, fatigue, etc.). Each section presents summaries of the information contained in specific reports and publications, all of which are fully identified as to title, authors, report number or journal reference, date of publication, and FIN number under which the work was performed

  5. Deriving cleanup guidelines for radionuclides at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

    1997-01-01

    Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL's Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory. With the exception of radium, there are no regulations or guidelines to establish cleanup guidelines for radionuclides in soils at BNL. BNL must derive radionuclide soil cleanup guidelines for a number of Operable Units (OUs) and Areas of Concern (AOCs). These guidelines are required by DOE under a proposed regulation for radiation protection of public health and the environment as well as to satisfy the requirements of CERCLA. The objective of this report is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL. Implementation of the approach is briefly discussed

  6. Development of H- sources at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Prelec, K.

    1977-01-01

    Negative hydrogen ion sources have been developed at Brookhaven National Laboratory for several years, with the initial goal to design a source for accelerator applications and later on to design a large unit for applications in neutral beam injectors of magnetic fusion devices. Three types of sources were investigated, a hollow discharge duoplasmatron yielding H - currents up to 60 mA, a Penning source yielding H - currents up to 440 mA, and a magnetron source yielding H - currents up to 1 A. All sources operate with a mixture of hydrogen gas and cesium vapors, and H - ions are most likely produced on cesium covered electrode surfaces. A larger model of a Penning/magnetron source was constructed and will be tested soon; it incorporates among other new features a system for the cooling of the cathode

  7. Summer school in nuclear and radiochemistry at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Kolsky, K.L.

    2005-01-01

    The U.S. Department of Energy supports 24 fellowships for students to attend six-week programs at either San Jose State University in California, or Brookhaven National Laboratory (BNL) in New York. The American Chemical Society through the Division of Nuclear Science and Technology operates both schools. The twelve students at the BNL program are enrolled in the State University of New York at Stony Brook (SUNYSB) and receive 3 college credits for the lecture course (CHE-361) and 3 additional credits for the laboratory course (CHE-362). In addition to lectures and laboratories, students tour various nuclear facilities offsite, at BNL, and at SUNYSB. Opportunities are given the students to interact with faculty and scientists within the profession through the Guest Lecture Program. Further details are discussed along with results of student surveys for the years 1999 through 2002. (author)

  8. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and

  9. Environmental Survey preliminary report, Brookhaven National Laboratory, Upton, New York

    Energy Technology Data Exchange (ETDEWEB)

    1988-06-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Brookhaven National Laboratory (BNL) conducted April 6 through 17, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with BNL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at BNL, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Oak Ridge National Laboratory. When completed, the results will be incorporated into the BNL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the BNL Survey. 80 refs., 24 figs., 48 tabs.

  10. Environmental Survey preliminary report, Brookhaven National Laboratory, Upton, New York

    International Nuclear Information System (INIS)

    1988-06-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Brookhaven National Laboratory (BNL) conducted April 6 through 17, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with BNL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at BNL, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Oak Ridge National Laboratory. When completed, the results will be incorporated into the BNL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the BNL Survey. 80 refs., 24 figs., 48 tabs

  11. DECOMMISSIONING THE BROOKHAVEN NATIONAL LABORATORY BUILDING 830 GAMMA IRRADIATION FACILITY.

    Energy Technology Data Exchange (ETDEWEB)

    BOWERMAN, B.S.; SULLIVAN, P.T.

    2001-08-13

    The Building 830 Gamma Irradiation Facility (GIF) at Brookhaven National Laboratory (BNL) was decommissioned because its design was not in compliance with current hazardous tank standards and its cobalt-60 sources were approaching the end of their useful life. The facility contained 354 stainless steel encapsulated cobalt-60 sources in a pool, which provided shielding. Total cobalt-60 inventory amounted to 24,000 Curies when the sources were shipped for disposal. The decommissioning project included packaging, transport, and disposal of the sources and dismantling and disposing of all other equipment associated with the facility. Worker exposure was a major concern in planning for the packaging and disposal of the sources. These activities were planned carefully according to ALARA (As Low As Reasonably Achievable) principles. As a result, the actual occupational exposures experienced during the work were within the planned levels. Disposal of the pool water required addressing environmental concerns, since the planned method was to discharge the slightly contaminated water to the BNL sewage treatment plant. After the BNL evaluation procedure for discharge to the sewage treatment plant was revised and reviewed by regulators and BNL's Community Advisory Council, the pool water was discharged to the Building 830 sanitary system. Because the sources were sealed and the pool water contamination levels were low, most of the remaining equipment was not contaminated; therefore disposal was straightforward, as scrap metal and construction debris.

  12. Brookhaven National Laboratory 2008 Site Environment Report Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Brookhaven National Laboratory

    2009-10-01

    Brookhaven National Laboratory (BNL) prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1A, Environment, Safety and Health Reporting of the U.S. Department of Energy. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory's environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all of its environmental history since the Laboratory's inception in 1947. Volume II of the SER, the Groundwater Status Report, also is prepared annually to report on the status of and evaluate the performance of groundwater treatment systems at the Laboratory. Volume II includes detailed technical summaries of groundwater data and its interpretation, and is intended for internal BNL users, regulators, and other technically oriented stakeholders. A brief summary of the information contained in Volume II is included in this volume in Chapter 7, Groundwater Protection. Both reports are available in print and as downloadable files on the BNL web page at http://www.bnl.gov/ewms/ser/. An electronic version on compact disc is distributed with each printed report. In addition, a summary of Volume I is prepared each year to provide a general overview of the report, and is distributed with a compact disc containing the full report.

  13. Tiger Team assessment of the Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1990-06-01

    This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment conducted at Brookhaven National Laboratory (BNL) in Upton, New York, between March 26 and April 27, 1990. The BNL is a multiprogram laboratory operated by the Associated Universities, Inc., (AUI) for DOE. The purpose of the assessment was to provide the status of environment, safety, and health (ES H) programs at the laboratory. The scope of the assessment included a review of management systems and operating procedures and records; observations of facility operations; and interviews at the facilities. Subteams in four areas performed the review: ES H, Occupational Safety and Health, and Management and Organization. The assessment was comprehensive, covering all areas of ES H activities and waste management operations. Compliance with applicable Federal, State, and local regulations; applicable DOE Orders; and internal BNL requirements was assessed. In addition, the assessment included an evaluation of the adequacy and effectiveness of the DOE and the site contractor, Associated Universities, Inc. (AUI), management, organization, and administration of the ES H programs at BNL. This volume contains appendices.

  14. Brookhaven National Laboratory's Accelerator Test Facility: research highlights and plans

    Science.gov (United States)

    Pogorelsky, I. V.; Ben-Zvi, I.

    2014-08-01

    The Accelerator Test Facility (ATF) at Brookhaven National Laboratory has served as a user facility for accelerator science for over a quarter of a century. In fulfilling this mission, the ATF offers the unique combination of a high-brightness 80 MeV electron beam that is synchronized to a 1 TW picosecond CO2 laser. We unveil herein our plan to considerably expand the ATF's floor space with an upgrade of the electron beam's energy to 300 MeV and the CO2 laser's peak power to 100 TW. This upgrade will propel the ATF even further to the forefront of research on advanced accelerators and radiation sources, supporting the most innovative ideas in this field. We discuss emerging opportunities for scientific breakthroughs, including the following: plasma wakefield acceleration studies in research directions already active at the ATF; laser wakefield acceleration (LWFA), where the longer laser wavelengths are expected to engender a proportional increase in the beam's charge while our linac will assure, for the first time, the opportunity to undertake detailed studies of seeding and staging of the LWFA; proton acceleration to the 100-200 MeV level, which is essential for medical applications; and others.

  15. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  16. The program of the ALARA Center at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Khan, T.A.; Baum, J.W.

    1993-01-01

    In 1984 the Brookhaven National Laboratory was asked by the Nuclear Regulatory Commission to set up a Center to monitor dose-reduction efforts in the US and abroad and to focus the industry's attention on ALARA. The paper summarizes the main work of the ALARA Center between 1984 and 1992. The Center maintains nine data bases for the NRC and the Nuclear Power Industry. These databases are constantly updated and access to them is provided through a personal computer and a modem and by periodic publications in the form of a newsletter and NUREG reports. Also described briefly are eight other projects related to dose-reduction at nuclear power plants that the Center has carried out for the NRC. Among these are projects that analyze the cost-effectiveness of engineering modifications, look at worldwide activities at dose reduction and compare US and foreign dose experience, examine high-dose worker groups and high-dose jobs, develop optimum techniques to control contamination at nuclear plants, and look at the doses being received by men and women in all sectors of the nuclear industry

  17. Tiger Team assessment of the Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1990-06-01

    This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment conducted at Brookhaven National Laboratory (BNL) in Upton, New York, between March 26 and April 27, 1990. The BNL is a multiprogram laboratory operated by the Associated Universities, Inc., (AUI) for DOE. The purpose of the assessment was to provide the status of environment, safety, and health (ES H) programs at the Laboratory. The scope of the assessment included a review of management systems and operating procedures and records; observations of facility operations; and interviews at the facilities. Subteams in four areas performed the review: ES H, Occupational Safety and Health, and Management and Organization. The assessment was comprehensive, covering all areas of ES H activities and waste management operations. Compliance with applicable Federal, State, and local regulations; applicable DOE Orders; and internal BNL requirements was assessed. In addition, the assessment included an evaluation of the adequacy and effectiveness of the DOE and the site contractor, Associated Universities, Inc. (AUI), management, organization, and administration of the ES H programs at BNL.

  18. In vivo neutron activation facility at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Ma, R.; Yasumura, Seiichi; Dilmanian, F.A.

    1997-11-01

    Seven important body elements, C, N, Ca, P, K, Na, and Cl, can be measured with great precision and accuracy in the in vivo neutron activation facilities at Brookhaven National Laboratory. The facilities include the delayed-gamma neutron activation, the prompt-gamma neutron activation, and the inelastic neutron scattering systems. In conjunction with measurements of total body water by the tritiated-water dilution method several body compartments can be defined from the contents of these elements, also with high precision. In particular, body fat mass is derived from total body carbon together with total body calcium and nitrogen; body protein mass is derived from total body nitrogen; extracellular fluid volume is derived from total body sodium and chlorine; lean body mass and body cell mass are derived from total body potassium; and, skeletal mass is derived from total body calcium. Thus, we suggest that neutron activation analysis may be valuable for calibrating some of the instruments routinely used in clinical studies of body composition. The instruments that would benefit from absolute calibration against neutron activation analysis are bioelectric impedance analysis, infrared interactance, transmission ultrasound, and dual energy x-ray/photon absorptiometry.

  19. Proto-2, an ALICE detector prototype, part of the STAR experiment at the Brookhaven National Laboratory

    CERN Multimedia

    2002-01-01

    Proto-2, an LAICE detector prototype, overcame its prototype status to become a real part of the SDTAR, epxeriment at the US Brookhaven National Laboratory. After more than two years across the ocean, it has just arrived back at CERN.

  20. PHOBOS at RHIC 2000

    International Nuclear Information System (INIS)

    Garcia, E.; Baum, R.; Bindel, R.; Mignerey, A.; Shea, J.; Back, B.B.; Betts, R.R.; George, N.; Wuosmaa, A.H.; Baker, M.D.; Barton, D.S.; Carroll, A.; Ceglia, M.; Gushue, S.; Heintzelman, G.A.; Kraner, H.; Olszewski, A.; Pak, R.; Remsberg, L.P.; Scaduto, J.; Sinacore, J.; Steinberg, P.; Sukhanov, A.; Bogucki, W.; Budzanowski, A.; Coghen, T.; Dabrowski, B.; Despet, M.; Galuszka, K.; Godlewski, J.; Halik, J.; Holynski, R.; Kita, W.; Kotula, J.; Lemler, M.; Ligocki, J.; Michalowski, J.; Sawicki, P.; Straczek, A.; Stodulski, M.; Strek, M.; Stopa, Z.; Trzupek, A.; Wosiek, B.; Wozniak, K.; Zychowski, P.; Bialas, A.; Czyz, W.; Zalewski, K.; Basilev, S.; Bates, B.D.; Busza, W.; Decowski, M.P.; Fita, P.; Fitch, J.; Friedl, M.; Gomes, C.; Griesmayer, E.; Gulbrandsen, K.; Haridas, P.; Henderson, C.; Kane, J.; Katzy, J.; Kulinich, P.; Law, C.; Mulmenstadt, J.; Neal, M.; Patel, M.; Pernegger, H.; Plesko, M.; Reed, C.; Roland, C.; Roland, G.; Ross, D.; Rosenberg, L.; Ryan, J.; Sarin, P.; Steadman, S.G.; Stephans, G.S.F.; Surowiecka, K.; Vale, C.M.; Van Nieuwenhuizen, G.J.; Verdier, R.; Wadsworth, B.; Wyslouch, B.; Chang, Y.H.; Chen, A.E.; Lin, W.T.; Tang, J.L.; Conner, C.; Ganz, R.; Halliwell, C.; Hollis, R.; Holzman, B.; Kucewicz, W.; McLeod, D.; Nouicer, R.; Reuter, M.; Hayes, A.; Johnson, E.; Manly, S.; Park, I.C.; Skulski, W.; Teng, R.; Wolfs, F.L.H.; Sanzgiri, A.

    2001-01-01

    The relativistic heavy ion collider (RHIC) at Brookhaven national laboratory delivered in June 2000 the first collisions between Au nuclei at the highest center-of-mass energies achieved in a controlled environment to date. PHOBOS is one of the four experiments installed during this phase of RHIC running. This paper will describe the PHOBOS experiment, and discuss the results of the first physics measurement, thc pseudo rapidity densities of primary charged particles near mid rapidity in central Au + Au collisions at two different energies, √ S NN = 56 and 130 GeV. The observed densities are higher than those previously observed in any collisions, and the rate of increase between the two energies is larger than that for nucleon-nucleon collisions at comparable beam energies. This talk will describe the PHOBOS experiment, discuss the first physics measurement, and conclude with the present status of the experiment, the physics analysis and the perspectives fi the future. (Author)

  1. Wildland Fire Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Green,T.

    2009-10-23

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the

  2. Brookhaven National Laboratory site environmental report for calendar year 1993

    International Nuclear Information System (INIS)

    Naidu, J.R.; Royce, B.A.

    1994-05-01

    This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1993. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory's compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, two instances, of pH exceedances were observed at recharge basins, possible related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded on five occasions, three for residual chlorine and one each for iron and ammonia nitrogen. The chlorine exceedances were related to a malfunctioning hypochlorite dosing pump and ceased when the pump was repaired. While the iron and ammonia-nitrogen could be the result of disturbances to the sand filter beds during maintenance. The environmental monitoring data has identified site-specific contamination of ground water and soil. These areas are subject to Remedial Investigation/Feasibility Studies (RI/FS) under the Inter Agency Agreement (IAG). Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484. 1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs

  3. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  4. BROOKHAVEN: Getting a boost

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Some recent scenarios for the future of US high energy physics have glossed over the ongoing high energy physics role of Brookhaven's Alternating Gradient Synchrotron (AGS), seeing it being relegated essentially to a service function as the injector for the RHIC heavy ion collider. However this view is not shared by Brookhaven, now enjoying the benefits of a Booster to inject into the AGS

  5. A woman like you: Women scientists and engineers at Brookhaven National Laboratory. Careers in action

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    This publication by the women in Science and Engineering introduces career possibilities in science and engineering. It introduces what work and home life are like for women who have already entered these fields. Women at Brookhaven National Laboratory work in a variety of challenging research roles -- from biologist and environmental scientist to safety engineer, from patent lawyer to technician. Brookhaven National Laboratory is a multi-program laboratory which carries out basic and applied research in the physical, biomedical and environmental sciences and in selected energy technologies. The Laboratory is managed by Associated University, Inc., under contract with the US Department of Energy. Brookhaven and the other national laboratories, because of their enormous research resources, can play a critical role in a education and training of the workforce.

  6. A woman like you: Women scientists and engineers at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Benkovitz, Carmen; Bernholc, Nicole; Cohen, Anita; Eng, Susan; Enriquez-Leder, Rosario; Franz, Barbara; Gorden, Patricia; Hanson, Louise; Lamble, Geraldine; Martin, Harriet; Mastrangelo, Iris; McLane, Victoria; Villela, Maria-Alicia; Vivirito, Katherine; Woodhead, Avril

    1991-01-01

    This publication by the women in Science and Engineering introduces career possibilities in science and engineering. It introduces what work and home life are like for women who have already entered these fields. Women at Brookhaven National Laboratory work in a variety of challenging research roles -- from biologist and environmental scientist to safety engineer, from patent lawyer to technician. Brookhaven National Laboratory is a multi-program laboratory which carries out basic and applied research in the physical, biomedical and environmental sciences and in selected energy technologies. The Laboratory is managed by Associated University, Inc., under contract with the US Department of Energy. Brookhaven and the other national laboratories, because of their enormous research resources, can play a critical role in a education and training of the workforce.

  7. PHOBOS at RHIC 2000

    Energy Technology Data Exchange (ETDEWEB)

    Back, B. B [Argonne National Laboratory (United States)] (and others)

    2001-12-01

    The relativistic heavy ion collider (RHIC) at Brookhaven national laboratory delivered in June 2000 the first collisions between Au nuclei at the highest center-of-mass energies achieved in a controlled environment to date. PHOBOS is one of the four experiments installed during this phase of RHIC running. This paper will describe the PHOBOS experiment, and discuss the results of the first physics measurement, the pseudo rapidity densities of primary charged particles near mid rapidity in central Au+Au collisions at two different energies, S{sub N}N{sup .}5=56 and 130 GeV. The observed densities are higher than those previously observed in any collisions, and the rate of increase between the two energies is larger than that for nucleon-nucleon collisions at comparable beam energies. This talk will describe the PHOBOS experiment, discuss the first physics measurement, and conclude with the present status of the experiment, the physics analysis and the perspectives for the future. [Spanish] El elativistic heavy ion collider (RHIC) en Brookhaven national laboratory produjo por primera vez colisiones de nucleos de oro (Au) a las energias mas altas alcanzadas en un medio ambiente controlado. PHOBOS es uno de los cuatro experimentos presentes en DIC durante su fase inicial. Este articulo describe en detalle a PHOBOS y discute los primeros resultados publicados acerca de la fisica de DIC, esto es la densidad de particulas primarias a id rapidity en colisiones centrales de Au+Au a dos diferentes energias S{sub N}N{sup .}5 =56 y 130 GeV. Las densidades observadas son mas altas que en cualquier otra experimento anterior, las densidades obtenidas son tambien mas altas que las encontradas en colisiones proton-proton a energias comparables. Este articulo tambien discute el estado actual del experimento asi como los planes para el futuro.

  8. Mechanical support and transport system used for the neutrino horn system at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Walker, J.C.; Carroll, A.S.; Leonhardt, W.

    1987-01-01

    The study of neutrinos at the Alternating Gradient Synchrotron (AGS), Brookhaven National Laboratory (BNL), requires hardware for their initiation and control. The basics consist of a target, two horns and three collimators. This paper describes the installation, support and positioning of these components within a settling concrete blockhouse

  9. The PHENIX experiment at RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Tonse, S.R.; Thomas, J.H.

    1993-12-15

    Later this decade the Relativistic Heavy Ion Collider (RHIC) will be built at Brookhaven National Laboratory. Its goal will be to accelerate and collide Au beams at 100 GeV/c in an attempt to create a Quark Gluon Plasma (QGP). The PHENIX detector aims to detect the QGP through its leptonic and hadronic signatures. We describe here its physics capabilities and the details of the apparatus designed to pick out rare leptonic signatures from among hadronic multiplicities of up to 1500 particles per unit of rapidity.

  10. Beam profile measurements on RHIC

    International Nuclear Information System (INIS)

    Connolly, R.; Michnoff, R.; Moore, T.; Shea, T.; Tepikian, S.

    2000-01-01

    The Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Lab was commissioned during the summer of 1999. Transverse beam profiles on RHIC are measured with ionization profile monitors (IPMs). An IPM measures beam profiles by collecting the electrons liberated by residual gas ionization by the beam. The detector is placed in the gap of a dipole magnet to force the electrons to travel in straight lines from the beamline center to the collector. One IPM was tested and it measured the profiles of a single gold bunch containing 10 8 ions on consecutive turns. We show an example of one of these profiles giving transverse emittance. Also several profiles are combined into a mountain-range plot which shows betatron oscillations at injection

  11. 2003 Brookhaven National Laboratory Annual Illness and Injury Surveillance Report, Revised September 2007

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-02

    Annual Illness and Injury Surveillance Program report for 2003 for Brookhaven National Lab. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  12. Higher-order-mode absorbers for energy recovery linac cryomodules at Brookhaven National Laboratory

    Directory of Open Access Journals (Sweden)

    H. Hahn

    2010-12-01

    Full Text Available Several future accelerator projects at Brookhaven for the Relativistic Heavy Ion Collider (RHIC are based on energy recovery linacs (ERLs with high-charge high-current electron beams. Their stable operation mandates effective higher-order-mode (HOM damping. The development of HOM dampers for these projects is pursued actively at this laboratory. Strong HOM damping was experimentally demonstrated both at room and at superconducting (SC temperatures in a prototype research and development (R&D five-cell niobium superconducting rf (SRF cavity with ferrite dampers. Two room-temperature mock-up five-cell copper cavities were used to study various damper configurations with emphasis on capacitive antenna dampers. An innovative type of ferrite damper over a ceramic break for an R&D SRF electron gun also was developed. For future SRF linacs longer cryomodules comprised of multiple superconducting cavities with reasonably short intercavity transitions are planned. In such a configuration, the dampers, located closer to the cavities, will be at cryogenic temperatures; this will impose additional constraints and complications. This paper presents the results of simulations and measurements of several damper configurations.

  13. Higher-order-mode absorbers for energy recovery linac cryomodules at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Hahn, H.; Ben-Zvi, I.; Calaga, R.; Hammons, L.; Johnson, E.C.; Kewisch, J.; Litvinenko, V.N.; Xu, W.

    2010-01-01

    Several future accelerator projects at Brookhaven for the Relativistic Heavy Ion Collider (RHIC) are based on energy recovery linacs (ERLs) with high-charge high-current electron beams. Their stable operation mandates effective higher-order-mode (HOM) damping. The development of HOM dampers for these projects is pursued actively at this laboratory. Strong HOM damping was experimentally demonstrated both at room and at superconducting (SC) temperatures in a prototype research and development (R and D) five-cell niobium superconducting rf (SRF) cavity with ferrite dampers. Two room-temperature mock-up five-cell copper cavities were used to study various damper configurations with emphasis on capacitive antenna dampers. An innovative type of ferrite damper over a ceramic break for an R and D SRF electron gun also was developed. For future SRF linacs longer cryomodules comprised of multiple superconducting cavities with reasonably short intercavity transitions are planned. In such a configuration, the dampers, located closer to the cavities, will be at cryogenic temperatures; this will impose additional constraints and complications. This paper presents the results of simulations and measurements of several damper configurations.

  14. Higher-order-mode absorbers for energy recovery linac cryomodules at Brookhaven National Laboratory

    Science.gov (United States)

    Hahn, H.; Ben-Zvi, I.; Calaga, R.; Hammons, L.; Johnson, E. C.; Kewisch, J.; Litvinenko, V. N.; Xu, Wencan

    2010-12-01

    Several future accelerator projects at Brookhaven for the Relativistic Heavy Ion Collider (RHIC) are based on energy recovery linacs (ERLs) with high-charge high-current electron beams. Their stable operation mandates effective higher-order-mode (HOM) damping. The development of HOM dampers for these projects is pursued actively at this laboratory. Strong HOM damping was experimentally demonstrated both at room and at superconducting (SC) temperatures in a prototype research and development (R&D) five-cell niobium superconducting rf (SRF) cavity with ferrite dampers. Two room-temperature mock-up five-cell copper cavities were used to study various damper configurations with emphasis on capacitive antenna dampers. An innovative type of ferrite damper over a ceramic break for an R&D SRF electron gun also was developed. For future SRF linacs longer cryomodules comprised of multiple superconducting cavities with reasonably short intercavity transitions are planned. In such a configuration, the dampers, located closer to the cavities, will be at cryogenic temperatures; this will impose additional constraints and complications. This paper presents the results of simulations and measurements of several damper configurations.

  15. Activities of the cross-section compilation and evaluation centers at the Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Chernick, J.

    1967-01-01

    The growth of the compilation and evaluation efforts at the Brookhaven National Laboratory are reviewed. The current work of the Sigma Center is discussed, including the status of the publication of supplements to BNL-325 and the current state of the SCISRS-I tape. Future needs for BNL-325 type publications and SCISRS-II cross-section tapes are outlined. The history of the Cross-Section Evaluation Center at the Brookhaven National Laboratory is similarly reviewed. The status of current work is discussed, including the growth of the ENDF/A tape. The status of US efforts to produce a cross-section tape (ENDF7B) at an early date to satisfy the needs of US reactor designers is discussed. The continued importance of integral experiments and their accurate analysis to provide checks of the cross-section tapes is pointed out. The role of the Brookhaven National Laboratory in collaboration on an international basis is reviewed, including its current relationship to the ENEA Neutron Data Compilation Centre, the International Atomic Energy Agency and other nuclear centres. (author)

  16. BROOKHAVEN: Booster commissioned

    Energy Technology Data Exchange (ETDEWEB)

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  17. Synchrotron radiation applications in medical research at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Thomlinson, W.

    1997-08-01

    In the relatively short time that synchrotrons have been available to the scientific community, their characteristic beams of UV and X-ray radiation have been applied to virtually all areas of medical science which use ionizing radiation. The ability to tune intense monochromatic beams over wide energy ranges clearly differentiates these sources from standard clinical and research tools. The tunable spectrum, high intrinsic collimation of the beams, polarization and intensity of the beams make possible in-vitro and in-vivo research and therapeutic programs not otherwise possible. From the beginning of research operation at the National Synchrotron Light Source (NSLS), many programs have been carrying out basic biomedical research. At first, the research was limited to in-vitro programs such as the x-ray microscope, circular dichroism, XAFS, protein crystallography, micro-tomography and fluorescence analysis. Later, as the coronary angiography program made plans to move its experimental phase from SSRL to the NSLS, it became clear that other in-vivo projects could also be carried out at the synchrotron. The development of SMERF (Synchrotron Medical Research Facility) on beamline X17 became the home not only for angiography but also for the MECT (Multiple Energy Computed Tomography) project for cerebral and vascular imaging. The high energy spectrum on X17 is necessary for the MRT (Microplanar Radiation Therapy) experiments. Experience with these programs and the existence of the Medical Programs Group at the NSLS led to the development of a program in synchrotron based mammography. A recent adaptation of the angiography hardware has made it possible to image human lungs (bronchography). Fig. 1 schematically depicts the broad range of active programs at the NSLS

  18. BROOKHAVEN: Japanese collaboration

    International Nuclear Information System (INIS)

    Thieberger, Peter

    1995-01-01

    Full text: The Japanese RIKEN Laboratory is contributing $20 million to help construct the RHIC Relativistic Heavy Ion Collider now being built at Brookhaven and due to be completed in 1999. In return, RIKEN will participate in research at RHIC. RHIC is being built to collide beams of heavy ions at energies of about 100 GeV per nucleon to explore hot and dense states of nuclear matter, with the ultimate aim of finding the quark-gluon plasma, the medium which existed in the fiery aftermath of the Big Bang before subsequently 'freezing' into nucleons. However another long-time Brookhaven speciality is handling beams of polarized (spin-oriented) protons in the 30 GeV AGS Alternating Gradient Synchrotron, which will act as the injector for RHIC. With the involvement of RIKEN, the RHIC programme now expands to cover polarized protons. Half of the RIKEN support will be used to build and install the special hardware needed to handle the polarized beams in RHIC. This includes 'Siberian Snakes' to negotiate depolarizing resonances which would otherwise mar beam acceleration (September 1994, page 27). The remaining RIKEN funding will go towards additional equipment for the PHENIX detector (May 1992, page 10) to enable it to cover spin physics. This equipment includes a second muon arm, with a magnet and tracking chamber. A multidisciplinary laboratory, RIKEN - Rikagaku Kenkyusho, or the Institute of Physical and Chemical Research - near Tokyo is currently the scene of construction of an 8 GeV synchrotron X-ray source

  19. Seismic hazard studies for the high flux beam reactor at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Costantino, C.J.; Heymsfield, E.; Park, Y.J.; Hofmayer, C.H.

    1991-01-01

    This paper presents the results of a calculation to determine the site specific seismic hazard appropriate for the deep soil site at Brookhaven National Laboratory (BNL) which is to be used in the risk assessment studies being conducted for the High Flux Beam Reactor (HFBR). The calculations use as input the seismic hazard defined for the bedrock outcrop by a study conducted at Lawrence Livermore National Laboratory (LLNL). Variability in site soil properties were included in the calculations to obtain the seismic hazard at the ground surface and compare these results with those using the generic amplification factors from the LLNL study

  20. Assessment of Energy Efficiency Project Financing Alternatives for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, W. D.; Hail, John C.; Sullivan, Gregory P.

    2000-02-14

    This document provides findings and recommendations that resulted from an assessment of the Brookhaven National Laboratory by a team from Pacific Northwest National Laboratory to assess the site's potential for various alternative financing options as a means to implement energy-efficiency improvements. The assessment looked for life-cycle cost-effective energy-efficiency improvement opportunities, and through a series of staff interviews, evaluated the various methods by which these opportunities may be financed, while considering availability of funds, staff, and available financing options. This report summarizes the findings of the visit and the resulting recommendations.

  1. BROOKHAVEN: Looking towards heavy ion physics

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    July 11-22 were busy days at Brookhaven with a two-week Summer Institute on Relativistic Heavy Ion Physics. After an intensive first week designed to introduce young physicists to high energy heavy ion research, the second week was a workshop on detector technology for Brookhaven's proposed Relativistic Heavy Ion Collider (RHIC), attended by some 150 physicists

  2. The Forward GEM Tracker of STAR at RHIC

    OpenAIRE

    Simon, F.; Balewski, J.; Fatemi, R.; Hasell, D.; Kelsey, J.; Majka, R.; Page, B.; Plesko, M.; Underwood, D.; Smirnov, N.; Sowinski, J.; Spinka, H.; Surrow, B.; Visser, G.

    2008-01-01

    The STAR experiment at the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory (BNL) is in the process of designing and constructing a forward tracking system based on triple GEM technology. This upgrade is necessary to give STAR the capability to reconstruct and identify the charge sign of W bosons over an extended rapidity range through their leptonic decay mode into an electron (positron) and a neutrino. This will allow a detailed study of the flavor-separated spin str...

  3. Summary of proposed approach for deriving cleanup guidelines for radionuclides in soil at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

    1996-11-01

    Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL`s Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory, carried out under an Interagency Agreement (IAG) with the United States Department of Energy (DOE), the United States Environmental Protection Agency (EPA) and the New York State Department of Environmental Conservation (NYSDEC). The objective of this paper is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL.

  4. Corrosion analysis of decommissioned carbon steel waste water tanks at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Soo, P.; Roberts, T.C.

    1995-07-01

    A corrosion analysis was carried out on available sections of carbon steels taken from two decommissioned radioactive waste water tanks at Brookhaven National Laboratory. One of the 100,000 gallon tanks suffered from a pinhole failure in the wall which was subsequently patched. From the analysis it was shown that this leak, and two adjacent leaks were initiated by a discarded copper heating coil that had been dropped into the tank during service. The failure mechanism is postulated to have been galvanic attack at points of contact between the tank structure and the coil. Other leaks in the two tanks are also described in this report

  5. Summary of proposed approach for deriving cleanup guidelines for radionuclides in soil at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

    1996-11-01

    Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL's Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory, carried out under an Interagency Agreement (IAG) with the United States Department of Energy (DOE), the United States Environmental Protection Agency (EPA) and the New York State Department of Environmental Conservation (NYSDEC). The objective of this paper is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL

  6. Risk-based priority scoring for Brookhaven National Laboratory environmental restoration programs

    International Nuclear Information System (INIS)

    Morris, S.C.; Meinhold, A.F.

    1995-05-01

    This report describes the process of estimating the risk associated with environmental restoration programs under the Brookhaven National Laboratory Office of Environmental Restoration. The process was part of an effort across all Department of Energy facilities to provide a consistent framework to communicate risk information about the facilities to senior managers in the DOE Office of Environmental Management to foster understanding of risk activities across programs. the risk evaluation was a qualitative exercise. Categories considered included: Public health and safety; site personnel safety and health; compliance; mission impact; cost-effective risk management; environmental protection; inherent worker risk; environmental effects of clean-up; and social, cultural, political, and economic impacts

  7. Applications of nuclear techniques for in vivo body composition studies at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Cohn, S.H.; Ellis, K.J.; Vartsky, D.; Vaswani, A.N.; Wielopolski, L.

    1981-01-01

    A series of technical developments and their clinical applications in various nuclear technologies at Brookhaven National Laboratory is described. These include the development of a portable neutron activation facility for measuring cadmium in vivo in kidney and liver, a technique for the measurement of body iron utilizing nuclear resonant scattering of gamma rays, a non-invasive measure of the skeletal levels of lead by an x-ray fluorescence technique, and the development of a pulsed Van de Graaff generator as a source of pulsed neutrons for the measurement of lung silicon

  8. Applications of nuclear techniques for in vivo body composition studies at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Cohn, S.H.; Ellis, K.J.; Vartsky, D.; Vaswani, A.N.; Wielopolski, L.

    1981-01-01

    A series of technical developments and their clinical applications in various nuclear technologies at Brookhaven National Laboratory is described. These include the development of a portable neutron activation facility for measuring cadmium in vivo in kidney and liver, a technique for the measurement of body iron utilizing nuclear resonant scattering of gamma rays, a non-invasive measure of the skeletal levels of lead by an x-ray fluorescence technique, and the development of a pulsed Van de Graaff generator as a source of pulsed neutrons for the measurement of lung silicon. (ACR)

  9. Recent Results from PHOBOS at Rhic

    Science.gov (United States)

    Garcia, Edmundo; Back, B. B.; Baker, M. D.; Ballintijn, M.; Barton, D. S.; Betts, R. R.; Bickley, A. A.; Bindel, R.; Busza, W.; Carroll, A.; Chai, Z.; Decowski, M. P.; Garcia, E.; Gburek, T.; George, N.; Gulbrandsen, K.; Halliwell, C.; Hamblen, J.; Hauer, M.; Henderson, C.; Hofman, D. J.; Hollis, R. S.; Hołyński, R.; Holzman, B.; Iordanova, A.; Johnson, E.; Kane, J. L.; Khan, N.; Kulinich, P.; Kuo, C. M.; Lin, W. T.; Manly, S.; Mignerey, A. C.; Nouicer, R.; Olszewski, A.; Pak, R.; Reed, C.; Roland, C.; Roland, G.; Sagerer, J.; Seals, H.; Sedykh, I.; Smith, C. E.; Stankiewicz, M. A.; Steinberg, P.; Stephans, G. S. F.; Sukhanov, A.; Tonjes, M. B.; Trzupek, A.; Vale, C.; van Nieuwenhuizen, G. J.; Vaurynovich, S. S.; Verdier, R.; Veres, G. I.; Wenger, E.; Wolfs, F. L. H.; Wosiek, B.; Woźniak, K.; Wysłouch, B.

    The PHOBOS detector is one of four heavy-ion experiments at the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory. In this paper we will review some of the results of PHOBOS from the data collected in p+p, d+Au and Au+Au collisions at nucleon-nucleon center-of-mass energies up to 200 GeV. In the most central Au+Au collisions at the highest energy, evidence is found for the formation of a very high energy density and highly interactive system, which can not be described in terms of hadrons, and which has a relatively low baryon density.

  10. Ferrite HOM Absorber for the RHIC ERL

    Energy Technology Data Exchange (ETDEWEB)

    Hahn,H.; Choi, E.M.; Hammons, L.

    2008-10-01

    A superconducting Energy Recovery Linac is under construction at Brookhaven National Laboratory to serve as test bed for RHIC upgrades. The damping of higher-order modes in the superconducting five-cell cavity for the Energy-Recovery linac at RHIC is performed exclusively by two ferrite absorbers. The ferrite properties have been measured in ferrite-loaded pill box cavities resulting in the permeability values given by a first-order Debye model for the tiled absorber structure and an equivalent permeability value for computer simulations with solid ring dampers. Measured and simulated results for the higher-order modes in the prototype copper cavity are discussed. First room-temperature measurements of the finished niobium cavity are presented which confirm the effective damping of higher-order modes in the ERL. by the ferrite absorbers.

  11. Brookhaven highlights. Report on research, October 1, 1992--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, M.S.; Belford, M.; Cohen, A.; Greenberg, D.; Seubert, L. [eds.

    1993-12-31

    This report highlights the research activities of Brookhaven National Laboratory during the period dating from October 1, 1992 through September 30, 1993. There are contributions to the report from different programs and departments within the laboratory. These include technology transfer, RHIC, Alternating Gradient Synchrotron, physics, biology, national synchrotron light source, applied science, medical science, advanced technology, chemistry, reactor physics, safety and environmental protection, instrumentation, and computing and communications.

  12. Conceptual design of the Relativistic Heavy Ion Collider [RHIC

    International Nuclear Information System (INIS)

    1989-05-01

    In August 1984 Brookhaven National Laboratory submitted a proposal for the construction of a Relativistic Heavy Ion Collider (RHIC) to the US Department of Energy. A Conceptual Design Report for the RHIC facility was completed in May 1986 after detailed reviews of the machine design, and of the requirements of the physics research program. Since that time an extensive R ampersand D program has been initiated and considerable work has been carried out to refine the design and specification of the major accelerator components, as well as the needs for research detectors, and to prepare the project for construction. This document is an update of the Conceptual Design Report, incorporating the results of work carried out since the beginning of Fiscal Year 1987 when a formal R ampersand D program for the RHIC project funded by DOE was initiated

  13. Clinical trials of boron neutron capture therapy [in humans] [at Beth Israel Deaconess Medical Center][at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Wallace, Christine

    2001-01-01

    Assessment of research records of Boron Neutron Capture Therapy was conducted at Brookhaven National Laboratory and Beth Israel Deaconess Medical Center using the Code of Federal Regulations, FDA Regulations and Good Clinical Practice Guidelines. Clinical data were collected FR-om subjects' research charts, and differences in conduct of studies at both centers were examined. Records maintained at Brookhaven National Laboratory were not in compliance with regulatory standards. Beth Israel's records followed federal regulations. Deficiencies discovered at both sites are discussed in the reports

  14. EVENT GENERATOR FOR RHIC SPIN PHYSICS

    International Nuclear Information System (INIS)

    SAITO, N.; SCHAEFER, A.

    1999-01-01

    This volume archives the reports from the RIKEN BNL Research Center workshop on ''Event Generator for RHIC Spin Physics II'' held during the week March 15, 1999 at Brookhaven National Laboratory. It was the second meeting on the subject following a first one in last September. This workshop has been initiated to establish a firm collaboration between theorists and experimentalists involved in RHIC spin physics with the aim of developing a reliable, high-precision event generator for RHIC spin physics. Needless to say, adequate event generators are indispensable tools for high energy physics programs in general, especially in the process of: planning the experimental programs; developing algorithms to extract the physics signals of interest; estimating the background in the extracted results, and connecting the final particle kinematics to the fundamental i.e. partonic level processes. Since RHIC is the first polarized collider, dedicated efforts are required to obtain a full-fledged event generator which describes spin dependent reactions in great detail

  15. Structural biology facilities at Brookhaven National Laboratory`s high flux beam reactor

    Energy Technology Data Exchange (ETDEWEB)

    Korszun, Z.R.; Saxena, A.M.; Schneider, D.K. [Brookhaven National Laboratory, Upton, NY (United States)

    1994-12-31

    The techniques for determining the structure of biological molecules and larger biological assemblies depend on the extent of order in the particular system. At the High Flux Beam Reactor at the Brookhaven National Laboratory, the Biology Department operates three beam lines dedicated to biological structure studies. These beam lines span the resolution range from approximately 700{Angstrom} to approximately 1.5{Angstrom} and are designed to perform structural studies on a wide range of biological systems. Beam line H3A is dedicated to single crystal diffraction studies of macromolecules, while beam line H3B is designed to study diffraction from partially ordered systems such as biological membranes. Beam line H9B is located on the cold source and is designed for small angle scattering experiments on oligomeric biological systems.

  16. Aerial radiological survey of the Brookhaven National Laboratory and surrounding area, May 1980

    International Nuclear Information System (INIS)

    Hobaugh, J.L.; Steiner, P.A.

    1984-01-01

    An aerial radiological survey was performed from 15 to 18 May 1980 over approximately a 21-square-kilometer (8-square-mile) area surrounding the Brookhaven National Laboratory (BNL). BNL is located in the center of Suffolk County, Long Island, New York. All gamma radiation data were collected by flying north-south lines spaced 91 meters (300 feet) apart at an altitude of 61 meters (200 feet) above ground level. A total of 17 anomalous areas were identified. The dominant isotopes found over these areas were cesium-137, manganese-54, and cobalt-60. All anomalies identified by the aerial measurements were correlated to site activities and storage facilities. 4 references, 18 figures, 1 table

  17. Industrial production of RHIC magnets

    International Nuclear Information System (INIS)

    Anerella, M.D.; Fisher, D.H.; Sheedy, E.; McGuire, T.

    1996-01-01

    RHIC 8 cm aperture dipole magnets and quadrupole cold masses are being built for Brookhaven National Laboratory (BNL) by Northrop Grumman Corporation at a production rate of one dipole magnet and two quadrupole cold masses per day. This work was preceded by a lengthy Technology Transfer effort which is described elsewhere. This paper describes the tooling which is being used for the construction effort, the production operations at each workstation, and also the use of trend plots of critical construction parameters as a tool for monitoring performance in production. A report on the improvements to production labor since the start of the programs is also provided. The magnet and cold mass designs, and magnetic test results are described in more detail in a separate paper

  18. In-situ containment of buried waste at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Dwyer, B.P.; Heiser, J.; Stewart, W.; Phillips, S.

    1997-01-01

    The primary objective of this project was to further develop close-coupled barrier technology for the containment of subsurface waste or contaminant migration. A close-coupled barrier is produced by first installing a conventional cement grout curtain followed by a thin inner lining of a polymer grout. The resultant barrier is a cement polymer composite that has economic benefits derived from the cement and performance benefits from the durable and chemically resistant polymer layer. The technology has matured from a regulatory investigation of issues concerning barriers and barrier materials to a pilot-scale, multiple individual column injections at Sandia National Labs (SNL) to full scale demonstration. The feasibility of this barrier concept was successfully proven in a full scale 'cold test' demonstration at Hanford, WA. Consequently, a full scale deployment of the technology was conducted at an actual environmental restoration site at Brookhaven National Lab (BNL), Long Island, NY. This paper discusses the installation and performance of a technology deployment implemented at OU-1 an Environmental Restoration Site located at BNL

  19. Construction and operation of an improved radiation calibration facility at Brookhaven National Laboratory. Environmental assessment

    International Nuclear Information System (INIS)

    1994-10-01

    Calibration of instruments used to detect and measure ionizing radiation has been conducted over the last 20 years at Brookhaven National Laboratory's (BNL) Radiation Calibration Facility, Building 348. Growth of research facilities, projects in progress, and more stringent Department of Energy (DOE) orders which involve exposure to nuclear radiation have placed substantial burdens on the existing radiation calibration facility. The facility currently does not meet the requirements of DOE Order 5480.4 or American National Standards Institute (ANSI) N323-1978, which establish calibration methods for portable radiation protection instruments used in the detection and measurement of levels of ionizing radiation fields or levels of radioactive surface contaminations. Failure to comply with this standard could mean instrumentation is not being calibrated to necessary levels of sensitivity. The Laboratory has also recently obtained a new neutron source and gamma beam irradiator which can not be made operational at existing facilities because of geometry and shielding inadequacies. These sources are needed to perform routine periodic calibrations of radiation detecting instruments used by scientific and technical personnel and to meet BNL's substantial increase in demand for radiation monitoring capabilities. To place these new sources into operation, it is proposed to construct an addition to the existing radiation calibration facility that would house all calibration sources and bring BNL calibration activities into compliance with DOE and ANSI standards. The purpose of this assessment is to identify potential significant environmental impacts associated with the construction and operation of an improved radiation calibration facility at BNL

  20. Viscous liquid barrier demonstration at the Brookhaven National Laboratory Linac Isotope Producer

    International Nuclear Information System (INIS)

    Heiser, J.H.; Sullivan, T.; Ludewig, H.; Brower, J.; North-Abbott, M.; Manchester, K.; Zaluski, M.; Penny, G.

    2000-01-01

    Groundwater monitoring has detected tritium ( 3 H) and 22 Na contamination down gradient from the Brookhaven LINAC Isotope Producer (BLIP), located at Brookhaven National Laboratory (BNL). Site characterization studies indicate that the BLIP is the source of contamination. The highest measured values for 3 H were 52,400 pCi/L recorded less than 100 feet south (down gradient) of the BLIP facility. The BLIP produces radioisotopes that are crucial in nuclear medicine for both research and clinical use. The BLIP also supports research on diagnostic and therapeutic radiopharmaceuticals. During operation a proton beam impinges a target (typically salts encapsulated in stainless steel) to produce the required radioisotopes. The proton beam is completely absorbed prior to reaching the soils surrounding the target shaft. However, secondary neutrons are produced that reach the soil causing activation products to form. Among the longer-lived isotopes of concern are tritium and 22 Na. Both of these isotopes have the potential to negatively impact the groundwater below the BLIP. Several corrective actions have been implemented at the BLIP facility in response to tritium detection in the groundwater. The first actions were to improve surface water management (e.g. storm water down spouts) and the installation of a gunite cap around the BLIP facility. These measures are designed to minimize water flow through the activated soils in the vicinity of BLIP. In conjunction with these improvements, BNL is installing a close-proximity subsurface barrier in the activated soils beneath the BLIP facility. The barrier will prevent water migration through the activated soil zone as well as prevent activation product migration out of the zone. To minimize impacts on the operation of the BLIP requires in-situ barrier installation using low energy techniques that will not disturb the alignment of the BLIP or nearby accelerator beams. BNL chose an innovative barrier technology termed Viscous

  1. Brookhaven FASTBUS ADC's

    International Nuclear Information System (INIS)

    Schmidt, M.P.; Black, J.K.; Blatt, S.R.

    1983-01-01

    A high energy physics experiment has been performed at Brookhaven National Laboratory on k/sub L/ 0 → 2π 0 decays employing a large (> 200 element) lead glass array as an electromagnetic calorimeter. To acquire pulse height information from the detector we have constructed ADC modules in the context of the Brookhaven Fastbus data acquisition system. Digitization (8 bits) and encoding, including pedestal subtraction and data sparsing, is achieved for each 16 channel module in 6 μsec

  2. A survey of the high energy physics program at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Hahn, H.; Rau, R.R.; Wanderer, P.

    1977-01-01

    About fifteen years ago the Alternating Gradient Synchrotron (AGS) at Brookhaven National Laboratory began operating for high energy particle physics experiments. A wealth of important results has been published, capped by four discoveries which have changed the field dramatically. These discoveries are: the muon neutrino, γsub(μ); the strangeness minus three Ω - baryon; CP violation in K 0 decay; and recently the totally unpredicted J/psi particle. The experimental program has broadened, matured and increased in scope following a large improvement program at the AGS. Major developments included: replacement of the original 50 MeV linear accelerator injector by a modern 200 MeV linac; construction of two new experimental areas, one for neutrino experiments and the other for counter-spark chamber electronics experiments, with the philosophy that nearly all circulating protons would be extracted from the machine and directed onto targets external to the machine; raising the circulating proton intensity to a maximum of 10 13 protons, and installation of a new magnet supply allowing a cycle of 2.4 seconds with a 1 second flat-top, or a 40% duty cycle. The paper also describes a crucial function of any particle physics laboratory, the plans and research directed toward new facilities to make available new regions for particle physics research. (Auth.)

  3. Effect of the solenoid in various conditions of the laser ion source at Brookhaven National Laboratory

    Science.gov (United States)

    Ikeda, S.; Kumaki, M.; Kanesue, T.; Okamura, M.

    2016-02-01

    In the laser ion source (LIS) at the Brookhaven National Laboratory (BNL), a solenoid is used to guide the laser ablation plasma and modulate the extracted beam current. Many types of ion species are guided. In some cases, the plasma plume is injected into the solenoid away from the solenoidal axis. To investigate the effects of the solenoid on the beam extracted from the plasma that has different properties, the beam current was measured in the setup of the LIS at the BNL. The beam current of Li, Al, Si, Fe, and Au increased when the magnetic field was applied. For most of the species the peak current and the total charge within a single beam pulse increased around 10 times with a magnetic field less than 100 G. In addition, for some species the rate of increase of the peak currents became smaller when the magnetic flux densities were larger than certain values depending on the species. In this case, the current waveforms were distorted. At the same magnetic field value, the field was more effective on lighter species than on heavier ones. When plasma was injected offset from the axis of the solenoid, peak current and total charge became half of those without offset. The experimental data are useful for the operation of the LIS at the BNL.

  4. Effect of the solenoid in various conditions of the laser ion source at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Ikeda, S.; Kumaki, M.; Kanesue, T.; Okamura, M.

    2016-01-01

    In the laser ion source (LIS) at the Brookhaven National Laboratory (BNL), a solenoid is used to guide the laser ablation plasma and modulate the extracted beam current. Many types of ion species are guided. In some cases, the plasma plume is injected into the solenoid away from the solenoidal axis. To investigate the effects of the solenoid on the beam extracted from the plasma that has different properties, the beam current was measured in the setup of the LIS at the BNL. The beam current of Li, Al, Si, Fe, and Au increased when the magnetic field was applied. For most of the species the peak current and the total charge within a single beam pulse increased around 10 times with a magnetic field less than 100 G. In addition, for some species the rate of increase of the peak currents became smaller when the magnetic flux densities were larger than certain values depending on the species. In this case, the current waveforms were distorted. At the same magnetic field value, the field was more effective on lighter species than on heavier ones. When plasma was injected offset from the axis of the solenoid, peak current and total charge became half of those without offset. The experimental data are useful for the operation of the LIS at the BNL

  5. Effect of the solenoid in various conditions of the laser ion source at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, S., E-mail: ikeda.s.ae@m.titech.ac.jp [Interdisciplinary Graduate School of Science and Engineering, Tokyo Institute of Technology, Yokohama, Kanagawa 216-8502 (Japan); Nishina Center for Accelerator-Based Science, RIKEN, Wako, Saitama 351-0108 (Japan); Kumaki, M. [Nishina Center for Accelerator-Based Science, RIKEN, Wako, Saitama 351-0108 (Japan); Kanesue, T.; Okamura, M. [Collider-Accelerator Department, Brookhaven National Laboratory, Upton, New York 11973-5000 (United States)

    2016-02-15

    In the laser ion source (LIS) at the Brookhaven National Laboratory (BNL), a solenoid is used to guide the laser ablation plasma and modulate the extracted beam current. Many types of ion species are guided. In some cases, the plasma plume is injected into the solenoid away from the solenoidal axis. To investigate the effects of the solenoid on the beam extracted from the plasma that has different properties, the beam current was measured in the setup of the LIS at the BNL. The beam current of Li, Al, Si, Fe, and Au increased when the magnetic field was applied. For most of the species the peak current and the total charge within a single beam pulse increased around 10 times with a magnetic field less than 100 G. In addition, for some species the rate of increase of the peak currents became smaller when the magnetic flux densities were larger than certain values depending on the species. In this case, the current waveforms were distorted. At the same magnetic field value, the field was more effective on lighter species than on heavier ones. When plasma was injected offset from the axis of the solenoid, peak current and total charge became half of those without offset. The experimental data are useful for the operation of the LIS at the BNL.

  6. Decommissioning of the High Flux Beam Reactor at Brookhaven National Laboratory.

    Science.gov (United States)

    Hu, Jih-Perng; Reciniello, Richard N; Holden, Norman E

    2012-08-01

    The High Flux Beam Reactor (HFBR) at the Brookhaven National Laboratory was a heavy-water cooled and moderated reactor that achieved criticality on 31 October 1965. It operated at a power level of 40 mega-watts. An equipment upgrade in 1982 allowed operations at 60 mega-watts. After a 1989 reactor shutdown to reanalyze safety impact of a hypothetical loss of coolant accident, the reactor was restarted in 1991 at 30 mega-watts. The HFBR was shut down in December 1996 for routine maintenance and refueling. At that time, a leak of tritiated water was identified by routine sampling of ground water from wells located adjacent to the reactor's spent fuel pool. The reactor remained shut down for almost 3 y for safety and environmental reviews. In November 1999, the United States Department of Energy decided to permanently shut down the HFBR. The decontamination and decommissioning of the HFBR complex, consisting of multiple structures and systems to operate and maintain the reactor, were complete in 2009 after removing and shipping off all the control rod blades. The emptied and cleaned HFBR dome, which still contains the irradiated reactor vessel is presently under 24/7 surveillance for safety. Details of the HFBR's cleanup performed during 1999-2009, to allow the BNL facilities to be re-accessed by the public, will be described in the paper.

  7. Interactive radiopharmaceutical facility between Yale Medical Center and Brookhaven National Laboratory. Progress report, October 1976-June 1979

    Energy Technology Data Exchange (ETDEWEB)

    Gottschalk, A.

    1979-01-01

    DOE Contract No. EY-76-S-02-4078 was started in October 1976 to set up an investigative radiochemical facility at the Yale Medical Center which would bridge the gap between current investigation with radionuclides at the Yale School of Medicine and the facilities in the Chemistry Department at the Brookhaven National Laboratory. To facilitate these goals, Dr. Mathew L. Thakur was recruited who joined the Yale University faculty in March of 1977. This report briefly summarizes our research accomplishments through the end of June 1979. These can be broadly classified into three categories: (1) research using indium-111 labelled cellular blood components; (2) development of new radiopharmaceuticals; and (3) interaction with Dr. Alfred Wolf and colleagues in the Chemistry Department of Brookhaven National Laboratory.

  8. Interactive radiopharmaceutical facility between Yale Medical Center and Brookhaven National Laboratory. Progress report, October 1976-June 1979

    International Nuclear Information System (INIS)

    Gottschalk, A.

    1979-01-01

    DOE Contract No. EY-76-S-02-4078 was started in October 1976 to set up an investigative radiochemical facility at the Yale Medical Center which would bridge the gap between current investigation with radionuclides at the Yale School of Medicine and the facilities in the Chemistry Department at the Brookhaven National Laboratory. To facilitate these goals, Dr. Mathew L. Thakur was recruited who joined the Yale University faculty in March of 1977. This report briefly summarizes our research accomplishments through the end of June 1979. These can be broadly classified into three categories: (1) research using indium-111 labelled cellular blood components; (2) development of new radiopharmaceuticals; and (3) interaction with Dr. Alfred Wolf and colleagues in the Chemistry Department of Brookhaven National Laboratory

  9. Department of Energy’s ARM Climate Research Facility External Data Center Operations Plan Located At Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Cialella, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Gregory, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Lazar, K. [Brookhaven National Lab. (BNL), Upton, NY (United States); Liang, M. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ma, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tilp, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Wagener, R. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-05-01

    The External Data Center (XDC) Operations Plan describes the activities performed to manage the XDC, located at Brookhaven National Laboratory (BNL), for the Department of Energy’s Atmospheric Radiation Measurement (ARM) Climate Research Facility. It includes all ARM infrastructure activities performed by the Data Management and Software Engineering Group (DMSE) at BNL. This plan establishes a baseline of expectation within the ARM Operations Management for the group managing the XDC.

  10. QCD and Heavy Ions RHIC Overview

    CERN Document Server

    Granier de Cassagnac, Raphael

    2010-01-01

    Nowadays, the most violent heavy ion collisions available to experimental study occur at the Relativistic Heavy Ion Collider (RHIC) of the Brookhaven National Laboratory. There, gold ions collide at psNN = 200 GeV. The early and most striking RHIC results were summarised in 2005 by its four experiments, BRAHMS, PHENIX, PHOBOS and STAR, in their so-called white papers [1, 2, 3, 4] that will be largely referenced thereafter. Beyond and after this, a wealth of data has been collected and analysed, providing additional information about the properties of the matter created at RHIC. It is categorically impossible to give a comprehensive review of these results in a 20 minutes talk or a 7 pages report. Here, I have made a selection of some of the most striking or intriguing signatures: jet quenching in Section 2, quarkonia suppressions in Section 3 and thermal photons in Section 4. A slightly longer and older version of this review can be found in [5]. Some updates are given here, as well as emphasis on new probes ...

  11. Status of superconducting magnet development (SSC, RHIC, LHC)

    International Nuclear Information System (INIS)

    Wanderer, P.

    1993-01-01

    This paper summarize recent superconducting accelerator magnet construction and test activities at the Superconducting Super Collider Laboratory (SSC), the Large Hadron Collider at CERN (LHC), and the Relativistic Heavy Ion Collider at Brookhaven (RHIC). Future plan are also presented

  12. Theoretical perspective on RHIC [relativistic heavy ion collider] physics

    International Nuclear Information System (INIS)

    Dover, C.B.

    1990-10-01

    We discuss the status of the relativistic heavy ion collider (RHIC) project at Brookhaven, and assess some key experiments which propose to detect the signatures of a transient quark-gluon plasma (QGP) phase in such collisions. 24 refs

  13. Status of superconducting magnet development (SSC, RHIC, LHC)

    International Nuclear Information System (INIS)

    Wanderer, P.

    1993-01-01

    This paper summarizes recent superconducting accelerator magnet construction and test activities at the Superconducting Super Collider Laboratory (SSC), the Large Hardon Collider at CERN (LHC), and the Relativistic Heavy Ion Collider at Brookhaven (RHIC). Future plans are also presented

  14. Future management of hazardous wastes generated at Brookhaven National Laboratory, Upton, New York. Environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    This document assesses the potential environmental impacts of a variety of alternatives which could provide a Resource Conservation and Recovery Act (RCRA) permitted waste packaging and storage facility that would handle all hazardous, radioactive, and mixed wastes generated at Brookhaven National Laboratory (BNL) and would operate in full compliance with all federal, state, and local laws and regulations. Location of the existing Hazardous Waste Management Facility (HWMF) with respect to ground water and the site boundary, technical and capacity limitations, inadequate utilities, and required remediation of the area make the existing facility environmentally unacceptable for long term continued use. This Environmental Assessment (EA) describes the need for action by the Department of Energy (DOE). It evaluates the alternatives for fulfilling that need, including the alternative preferred by DOE, a no-action alternative, and other reasonable alternatives. The EA provides a general description of BNL and the existing environment at the current HWMF and alternative locations considered for a new Waste Management Facility (WMF). Finally, the EA describes the potential environmental impacts of the alternatives considered. The preferred alternative, also identified as Alternative D, would be to construct and operate a new WMF on land formerly occupied by barracks during Camp Upton operations, in an area north of Building 830 and the High Flux Beam Reactor/Alternating Gradient Synchrotron (AGS) recharge basins, east of North Railroad Street, and south of East Fifth Avenue. The purpose of this new facility would be to move all storage and transfer activities inside buildings and on paved and curbed areas, consolidate facilities to improve operations management, and provide improved protection of the environment

  15. The neutrino horn 300 kiloampere pulsed power supply at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Sandberg, J.; Smith, G.A.; Carroll, A.S.

    1987-01-01

    A 300 Kiloampere pulsed power system used to energize the Brookhaven focusing neutrino horn is described. The constant current switching section, coaxial power feed and low level control system are presented. Calculations determining system performance are compared with measured values. Plans for future systems are discussed

  16. The RHIC general purpose multiplexed analog to digital converter system

    International Nuclear Information System (INIS)

    Michnoff, R.

    1995-01-01

    A general purpose multiplexed analog to digital converter system is currently under development to support acquisition of analog signals for the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory. The system consists of a custom intelligent VME based controller module (V113) and a 14-bit 64 channel multiplexed A/D converter module (V114). The design features two independent scan groups, where one scan group is capable of acquiring 64 channels at 60 Hz, concurrently with the second scan group acquiring data at an aggregate rate of up to 80 k samples/second. An interface to the RHIC serially encoded event line is used to synchronize acquisition. Data is stored in a circular static RAM buffer on the controller module, then transferred to a commercial VMEbus CPU board and higher level workstations for plotting, report Generation, analysis and storage

  17. HIGH-CURRENT ERL-BASED ELECTRON COOLING FOR RHIC

    International Nuclear Information System (INIS)

    BEN-ZVI, I.

    2005-01-01

    The design of an electron cooler must take into account both electron beam dynamics issues as well as the electron cooling physics. Research towards high-energy electron cooling of RHIC is in its 3rd year at Brookhaven National Laboratory. The luminosity upgrade of RHIC calls for electron cooling of various stored ion beams, such as 100 GeV/A gold ions at collision energies. The necessary electron energy of 54 MeV is clearly out of reach for DC accelerator system of any kind. The high energy also necessitates a bunched beam, with a high electron bunch charge, low emittance and small energy spread. The Collider-Accelerator Department adopted the Energy Recovery Linac (ERL) for generating the high-current, high-energy and high-quality electron beam. The RHIC electron cooler ERL will use four Superconducting RF (SRF) 5-cell cavities, designed to operate at ampere-class average currents with high bunch charges. The electron source will be a superconducting, 705.75 MHz laser-photocathode RF gun, followed up by a superconducting Energy Recovery Linac (ERL). An R and D ERL is under construction to demonstrate the ERL at the unprecedented average current of 0.5 amperes. Beam dynamics performance and luminosity enhancement are described for the case of magnetized and non-magnetized electron cooling of RHIC

  18. Summary of some work on high temperature superconductors at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Strongin, M.

    1987-01-01

    A summary is presented of recent high T/sub c/ superconductivity work by the Brookhaven staff. Significant work done by outside users on the major facilities is not discussed here. Theoretical work on mechanisms of superconductivity, is discussed separately elsewhere in this proceedings. The experimental work can be divided into two major categories; scattering and spectroscopy experiments at the Brookhaven facilities, and measurements of the macroscopic electrical and magnetic properties of the superconductors, as well as an additional contribution on sample preparation. An example of the complimentary nature of these techniques is shown for the case of penetration depth measurements, where the value of λ obtained using mu mesons as a microscopic probe of the internal fields is different than that obtained inductively. This difference leads to some insight into the inter-granular coupling

  19. Risk assessment and optimization (ALARA) analysis for the environmental remediation of Brookhaven National Laboratory's hazardous waste management facility

    International Nuclear Information System (INIS)

    Dionne, B.J.; Morris, S. III; Baum, J.W.

    1998-03-01

    The Department of Energy's (DOE) Office of Environment, Safety, and Health (EH) sought examples of risk-based approaches to environmental restoration to include in their guidance for DOE nuclear facilities. Extensive measurements of radiological contamination in soil and ground water have been made at Brookhaven National Laboratory's Hazardous Waste Management Facility (HWMF) as part of a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation process. This provided an ideal opportunity for a case study. This report provides a risk assessment and an open-quotes As Low as Reasonably Achievableclose quotes (ALARA) analysis for use at other DOE nuclear facilities as an example of a risk-based decision technique

  20. Production of quarkonia at RHIC

    Czech Academy of Sciences Publication Activity Database

    Vértési, Robert

    2016-01-01

    Roč. 31, 28-29 (2016), č. článku 1645036. ISSN 0217-751X R&D Projects: GA ČR GA13-20841S Institutional support: RVO:61389005 Keywords : Brookhaven RHIC Coll * quark onium: heavy * quark onium: production * quark gluon: plasma Subject RIV: BG - Nuclear, Atomic and Molecular Physics, Colliders Impact factor: 1.597, year: 2016

  1. SAFETY ENGINEERING FOR THE RELATIVISTIC HEAVY ION COLLIDER AT THE BROOKHAVEN NATIONAL LABORATORY

    International Nuclear Information System (INIS)

    Musolino, S.V.; Kane, S.F.; Levesque, J.W.

    1999-01-01

    THERE ARE ONLY A FEW OTHER HIGH ENERGY PARTICLE ACCELERATORS LIKE RHIC IN THE WORLD. THEREFORE, THE DESIGNERS OF THE MACHINE DO NOT ALWAYS HAVE CONSENSUS DESIGN STANDARDS AND REGULATORY GUIDANCE AVAILABLE TO ESTABLISH THE ENGINEERING PARAMETERS FOR SAFETY. SOME OF THE AREAS WHERE STANDARDS ARE NOT AVAILABLE RELATE TO THE CRYOGENIC SYSTEM, CONTAINMENT OF LARGE VOLUMES OF FLAMMABLE GAS IN FRAGILE VESSELS IN THE EXPERIMENTAL APPARATUS AND MITIGATION OF A DESIGN BASIS ACCIDENT WITH A STORED PARTICLE BEAM. UNIQUE BUT EQUIVALENT SAFETY ENGINEERING MUST BE DETERMINED. SPECIAL DESIGN CRITERIA FOR PROMPT RADIATION WERE DEVELOPED TO PROVIDE GUIDANCE FOR THE DESIGN OF RADIATION SHIELDING

  2. RHIC spin physics

    International Nuclear Information System (INIS)

    Bunce, G.

    1994-01-01

    The physics potential of colliding beams of protons, polarized either longitudinally or transversely, at RHIC is remarkable. A luminosity of L = 2 x 10 32 cm -2 with 70% polarized beams will be available with up to 250 GeV energy in each beam. The proposal to collide polarized protons in RHIC was submitted in August 1992 and approved in October 1993. We have funding for R ampersand D on Siberian Snakes, so that RHIC will be able to accelerate polarized protons early in its program. The expected date of the first heavy ion collisions is 1999. The spin physics program includes measurement of gluon and sea quark polarization in the longitudinally polarized proton, measurement and then application of parity violation in W and Z production, measurement of hard scattering parton-parton asymmetries, and quark polarization or transversity in transversely polarized protons. Single spin asymmetries allow sensitive searches for parity violation (longitudinal polarization), and correlations between quark spin and gluons (transverse). Probes include direct photons (to P T = 20 GeV/c), jets (to P T > 50 GeV/c), Drell-Yan pairs to M ell ell = 9 GeV, W ± , Z. This program is described in our Particle World paper. Here we will emphasize the new information included in our Update, given to the Brookhaven PAC this September

  3. RHIC spin physics

    International Nuclear Information System (INIS)

    Bunce, G.

    1993-01-01

    The physics potential of colliding beams of protons, polarized either longitudinally or transversely, at RHIC is remarkable. A luminosity of L = 2 x 10 32 cm -2 sec -1 with 70% polarized beams will be available with up to 250 GeV energy in each beam. The proposal to collide polarized protons in RHIC was submitted in August 1992 and approved in October 1993, just after this workshop. The collaboration has been encouraged to complete R ampersand D on Siberian Snakes, so that RHIC will be able to accelerate polarized protons early in its program. The expected date of the first heavy ion collisions is 1999. The spin physics program includes measurement of gluon and sea quark polarization in the longitudinally polarized proton, measurement and then application of parity violation in W and Z production, measurement of hard scattering parton-parton asymmetries, and quark polarization or transversity in transversely polarized protons. Single spin asymmetries allow sensitive searches for parity violation (longitudinal polarization), and correlations between quark spin and gluons (transverse). Probes include direct photons (to p T = 20 GeV/c), jets (to p T > 50 GeV/c), Drell-Yan pairs (to m ll = 9 GeV), W +/- , Z. Here, the collaboration emphasizes the new information included in the Update, given to the Brookhaven PAC this September

  4. RADIATION PROTECTION FOR THE RELATIVISTIC HEAVY ION-COLLIDER AT THE BROOKHAVEN NATIONAL LABORATORY

    International Nuclear Information System (INIS)

    Musolino, S.V.; Stevens, A.J.

    1999-01-01

    The Relativistic Heavy Ion Collider (RHIC) is a high energy particle accelerator built to study basic nuclear physics. It consists of two counter-rotating beams of fully stripped gold ions that are accelerated in two rings to an energy of 100 GeV/nucleon. The rings consist of a circular lattice of superconducting magnets 3.8 km in circumference. The beams can be stored for a period of five to ten hours and brought into collision for experiments during that time. The first major physics objective when the facility goes into operation is to recreate a state of matter, the quark-gluon plasma, that has been predicted to have existed at a short time after the creation of the universe. There are only a few other high energy particle accelerators like RHIC in the world. The rules promulgated in the Code of Federal Regulations under the Atomic Energy Act do not cover prompt radiation from accelerators, nor are there any State regulations that govern the design and operation of a superconducting collider. Special design criteria for prompt radiation were developed to provide guidance for the design of radiation shielding

  5. Corrector/quadrupole/sextupole power leads for the Relativistic Heavy Ion Collider at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Shutt, R.; Hornik, K.; Rehak, M.

    1993-01-01

    In RHIC (Relativistic Heavy Ion Collider), there are 492 CQS (Corrector/Quadrupole/Sextupole) assemblies which require leads to carry the current from the power supply to the magnet. The lead assemblies will contain these leads along with instrumentation voltage taps and current carrying wires that are used only for magnet warm-up. These lead assemblies are analyzed for two cooling schemes: (1) gas flow through the lead tube and (2) heat sinking the lead tube along a 40--70 K heat shield (without gas flow). The analysis was extended to include the modeling of the cold and warm ends and effects of superinsulation shielding the lead assembly against radiation (including heat conduction due to residual gas pressure in the surrounding vacuum). Extensive parametric studies of heat exchange areas, specific copper properties, length of the lead, etc. are also included in the analysis

  6. RHIC spin program

    International Nuclear Information System (INIS)

    Bunce, G.

    1995-01-01

    Colliding beams of high energy polarized protons at RHIC is an excellent way to probe the polarization of gluons, u and d quarks in a polarized proton. RHIC is the Relativistic Heavy Ion Collider being built now at Brookhaven in the ISABELLE tunnel. It is designed to collide gold ions on gold ions at 100 GeV/nucleon. Its goal is to discover the quark-gluon plasma, and the first collisions are expected in March, 1999. RHIC will also make an ideal polarized proton collider with high luminosity and 250 GeV x 250 GeV collisions. The RHIC spin physics program is: (1) Use well-understood perturbative QCD probes to study non-perturbative confining dynamics in QCD. We will measure - gluon and sea quark polarization in a polarized proton, polarization of quarks in a transversely polarized proton. (2) Look for additional surprises using the first high energy polarized proton collider. We will - look for the expected maximal parity violation in W and Z boson production, - search for parity violation in other processes, - test parton models with spin. This lecture is organized around a few of the key ideas: Siberian Snakes--What are they? High energy proton-proton collisions are scatters of quarks and leptons, at high x, a polarized proton beam is a beam of polarized u quarks, quark and gluon collisions are very sensitive to spin. We will discuss two reactions: how direct photon production measures gluon polarization, and how W + boson production measures u and d quark polarization

  7. RHIC spin program

    Energy Technology Data Exchange (ETDEWEB)

    Bunce, G.

    1995-12-31

    Colliding beams of high energy polarized protons at RHIC is an excellent way to probe the polarization of gluons, u and d quarks in a polarized proton. RHIC is the Relativistic Heavy Ion Collider being built now at Brookhaven in the ISABELLE tunnel. It is designed to collide gold ions on gold ions at 100 GeV/nucleon. Its goal is to discover the quark-gluon plasma, and the first collisions are expected in March, 1999. RHIC will also make an ideal polarized proton collider with high luminosity and 250 GeV x 250 GeV collisions. The RHIC spin physics program is: (1) Use well-understood perturbative QCD probes to study non-perturbative confining dynamics in QCD. We will measure - gluon and sea quark polarization in a polarized proton, polarization of quarks in a transversely polarized proton. (2) Look for additional surprises using the first high energy polarized proton collider. We will - look for the expected maximal parity violation in W and Z boson production, - search for parity violation in other processes, - test parton models with spin. This lecture is organized around a few of the key ideas: Siberian Snakes--What are they? High energy proton-proton collisions are scatters of quarks and leptons, at high x, a polarized proton beam is a beam of polarized u quarks, quark and gluon collisions are very sensitive to spin. We will discuss two reactions: how direct photon production measures gluon polarization, and how W{sup +} boson production measures u and d quark polarization.

  8. First results from RHIC-PHENIX

    CERN Document Server

    Ghosh, T K; Adler, S S; Ajitanand, N N; Akiba, Y; Alexander, J; Aphecetche, L; Arai, Y; Aronson, S H; Averbeck, R; Awes, T C; Barish, K N; Barnes, P D; Barrette, J; Bassalleck, B; Bathe, S; Baublis, V; Bazilevsky, A; Belikov, S V; Bellaiche, F G; Belyaev, S T; Bennett, M J; Berdnikov, Yu A; Botelho, S S; Brooks, M L; Brown, D S; Bruner, N L; Bucher, D; Büsching, H; Bunce, G M; Burward-Hoy, J M; Butsyk, S; Carey, T A; Chand, P; Chang, J; Chang, W C; Chavez, L L; Chernichenko, S K; Chi, C Y; Chiba, J; Chiu, M; Choudhury, R K; Christ, T; Chujo, T; Chung, M S; Chung, P; Cianciolo, V; Cole, B A; D'Enterria, D G; Dávid, G; Delagrange, H; Denisov, A; Deshpande, A A; Desmond, E J; Dietzsch, O; Dinesh, B V; Drees, A; Durum, A A; Dutta, D; Ebisu, K; Efremenko, Yu V; Chenawi, K E; En-Yo, H; Esumi, S C; Ewell, L A; Ferdousi, T; Fields, D E; Fokin, S L; Fraenkel, Zeev; Franz, A; Frawley, A D; Fung, S Y; Garpman, S; Ghosh, T K; Glenn, A; Godoi, A L; Goto, Y; Greene, S V; Grosse-Perdekamp, M; Gupta, S K; Guryn, W; Gustafsson, Hans Åke; Haggerty, J S; Hamagaki, H; Hansen, A G; Hara, H; Hartouni, E P; Havano, R; Hayashi, N; He, X; Hemmick, T K; Heuser, J M; Hill, J C; Ho, D S; Homma, K; Hong, B; Hoover, A; Ichihara, T; Imai, K; Ippolitov, M S; Ishihara, M; Jacak, B V; Jang, W Y; Jia, J; Johnson, B M; Johnson, S C; Joo, K S; Kametani, S; Kang, J H; Kann, M; Kapoor, S S; Kelly, S; Khachaturov, B A; Khanzadeev, A V; Kikuchi, J; Kim, D J; Kim, H J; Kim, S Y; Kim, Y G; Kinnison, W W; Kistenev, E P; Kiyomichi, A; Klein-Bösing, C; Klinksiek, S A; Kochenda, L M; Kochetkov, D; Kochetkov, V; Köhler, D; Kohama, T; Kozlov, A; Kroon, P J; Kurita, K; Kweon, M J; Kwon, Y; Kyle, G S; Lacey, R A; Lajoie, J G; Lauret, J; Lebedev, A; Lee, D M; Leitch, M J; Li, X H; Li, Z; Lim, D J; Liu, M X; Liu, X; Liu, Z; Maguire, C F; Mahon, J; Makdisi, Y I; Man'ko, V I; Mao, Y; Mark, S K; Markacs, S; Martínez, G; Marx, M D; Massaike, A; Matathias, F; Matsumoto, T; McGaughey, P L; Melnikov, E A; Merschmeyer, M; Messer, F; Messer, M; Miake, Y; Miller, T E; Milov, A; Mioduszewski, S; Mischke, R E; Mishra, G C; Mitchell, J T; Mohanty, A K; Morrison, D P; Moss, J M; Muhlbacher, F; Muniruzzaman, M; Murata, J; Nagamiya, S; Nagasaka, Y; Nagle, J L; Nakada, Y; Nandi, B K; Newby, J; Nikkinen, L; Nilsson, P O; Nishimura, S; Nyanin, A S; Nystrand, J; O'Brien, E; Ogilvie, C A; Ohnishi, H; Ojha, I D; Ono, M; Onuchin, V A; Oskarsson, A; Österman, L; Otterlund, I; Oyama, K; Paffrath, L; Palounek, A P T; Pantuev, V S; Papavassiliou, V; Pate, S F; Peitzmann, Thomas; Petridis, A N; Pinkenburg, C H; Pisani, R P; Pitukhin, P; Plasil, F; Pollack, M E; Pope, K; Purschke, M L; Ravinovich, I; Read, K F; Reygers, K; Riabov, V; Riabov, Y; Rosati, M; Rose, A A; Ryu, S S; Saitô, N; Sakaguchi, A; Sakaguchi, T; Sako, H; Sakuma, T; Samsonov, V; Sangster, T C; Santo, R; Sato, H D; Sato, S; Sawada, S; Schlei, B R; Schutz, Y; Semenov, V; Seto, R; Shea, T K; Shein, I; Shibata, T A; Shigaki, K; Shiina, T; Shin, Y H; Sibiryak, Yu; Silvermyr, D; Sim, K S; Simon-Gillo, J; Singh, C P; Singh, V; Sivertz, M; Soldatov, A; Soltz, R A; Sørensen, S; Stankus, P W; Starinsky, N; Steinberg, P; Stenlund, E; Ster, A; Stoll, S P; Sugioka, M; Sugitate, T; Sullivan, J P; Sumi, Y; Sun, Z; Suzuki, M; Takagui, E M; Taketani, A; Tamai, M; Tanaka, Y; Taniguchi, E; Tannenbaum, M J; Thomas, J; Thomas, J H; Thomas, T L; Tian, W; Tojo, J; Torii, H A; Towell, R S; Tserruya, Itzhak; Tsuruoke, H; Tsvetkov, A A; Tuli, S K; Tydesjo, H; Tyurin, N; Ushiroda, T; van Hecke, H; Velissaris, C; Velkovska, J; Velkovsky, M; Vingradov, A A; Volkov, M A; Vorobyov, A A; Vznuzdaev, E A; Wang, H; Watanabe, Y; White, S N; Witzig, C; Wohn, F K; Woody, C L; Xie, W; Yagi, K; Yokkaichi, S; Young, G R; Yushmanov, I E; Zajc, W A; Zhang, Z; Zhou, S

    2001-01-01

    The PHENIX experiment consists of a large detector system located at the newly commissioned Relativistic Heavy Ion Collider (RHIC) at the Brookhaven National Laboratory. The primary goal of the PHENIX experiment is to look for signatures of the QCD prediction of a deconfined high-energy-density phase of nuclear matter and the quark gluon plasma. PHENIX started taking data for Au+Au collisions at square root (s/sub NN/)=130 GeV in June 2000. The signals from the beam-beam counter (BBC) and zero degree calorimeter (ZDC) are used to determine the centrality of the collision. A Glauber model reproduces the ZDC spectrum reasonably well to determine the participants in a collision. The charged particle multiplicity distribution from the first PHENIX paper is compared with the other RHIC experiment and the CERN and SPS results. Transverse momentum of photons are measured in the electro-magnetic calorimeter (EMCal) and preliminary results an presented. Particle identification is made by a time-of-flight (TOF) detecto...

  9. A Prototype Ionization Profile Monitor for RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Connolly, R. [Brookhaven National Lab. (BNL), Upton, NY (United States); Cameron, P. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ryan, W. [Brookhaven National Lab. (BNL), Upton, NY (United States); Shea, T. [Brookhaven National Lab. (BNL), Upton, NY (United States); Sikora, R. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tsoupas, N. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    1997-03-17

    The Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Lab will accelerate and store beams of ions ranging from protons to gold nuclei. Transverse beam profiles will be obtained by measuring the distribution of free electrons formed by beam ionization of the residual gas. The electrons are swept from the beamline by a transverse electric field, amplified by a microchannel plate (MCP), and collected on a circuit board with strip anodes oriented parallel to the beam axis. A uniform magnetic field,parallel to the sweep electric field, counters the defocusing effects of space charge and recoil momentum. A single-plane prototype ionization profile montor (IPM) was installed near the end of the AGS-to-RHIC transfer line (ATR) and tested during the sextant commissioning rung. It measured vertical profiles of single bunches of Au nuclei with intensities of 0.6-1.0 x 108 particles. These profiles are compared to profiles on a fluorescent screen (WF3) located 2m downstream from the IPM. This paper describes the detector and gives results from the beam test.

  10. Upgrade of the controls for the Brookhaven linac

    International Nuclear Information System (INIS)

    Buxton, W.E.

    1995-01-01

    The control of the magnets, rf system, and other components at the Brookhaven Linac uses a system that was developed at Brookhaven in the late 1960's. This system will be retired in the summer of 1995. The Linac controls are being upgraded using modem VME-based hardware compatible with RHIC generation controls, and an existing serial field bus. The timing for the Linac will also be upgraded and will use components developed for RHIC. The controls in general, the timing for the Linac, and the modules developed will be described

  11. Risk assessment and optimization (ALARA) analysis for the environmental remediation of Brookhaven National Laboratory's hazardous waste management facility

    International Nuclear Information System (INIS)

    Dionne, B.J.; Morris, S.C. III; Baum, J.W.

    1998-01-01

    The Department of Energy's (DOE) Office of Environment, Safety, and Health (EH) sought examples of risk-based approaches to environmental restoration to include in their guidance for DOE nuclear facilities. Extensive measurements of radiological contamination in soil and ground water have been made at Brookhaven National Laboratory's Hazardous Waste Management Facility (HWMF) as part of a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation process. This provided an ideal opportunity for a case study. This report provides a risk assessment and an open-quotes As Low as Reasonably Achievableclose quotes (ALARA) analysis for use at other DOE nuclear facilities as an example of a risk-based decision technique. This document contains the Appendices for the report

  12. Risk assessment and optimization (ALARA) analysis for the environmental remediation of Brookhaven National Laboratory`s hazardous waste management facility

    Energy Technology Data Exchange (ETDEWEB)

    Dionne, B.J.; Morris, S.C. III; Baum, J.W. [and others

    1998-01-01

    The Department of Energy`s (DOE) Office of Environment, Safety, and Health (EH) sought examples of risk-based approaches to environmental restoration to include in their guidance for DOE nuclear facilities. Extensive measurements of radiological contamination in soil and ground water have been made at Brookhaven National Laboratory`s Hazardous Waste Management Facility (HWMF) as part of a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation process. This provided an ideal opportunity for a case study. This report provides a risk assessment and an {open_quotes}As Low as Reasonably Achievable{close_quotes} (ALARA) analysis for use at other DOE nuclear facilities as an example of a risk-based decision technique. This document contains the Appendices for the report.

  13. Risk assessment and optimization (ALARA) analysis for the environmental remediation of Brookhaven National Laboratory`s hazardous waste management facility

    Energy Technology Data Exchange (ETDEWEB)

    Dionne, B.J.; Morris, S. III; Baum, J.W. [and others

    1998-03-01

    The Department of Energy`s (DOE) Office of Environment, Safety, and Health (EH) sought examples of risk-based approaches to environmental restoration to include in their guidance for DOE nuclear facilities. Extensive measurements of radiological contamination in soil and ground water have been made at Brookhaven National Laboratory`s Hazardous Waste Management Facility (HWMF) as part of a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation process. This provided an ideal opportunity for a case study. This report provides a risk assessment and an {open_quotes}As Low as Reasonably Achievable{close_quotes} (ALARA) analysis for use at other DOE nuclear facilities as an example of a risk-based decision technique.

  14. Relativistic heavy ions from the BNL [Brookhaven National Laboratory] booster medical research and technological applications

    International Nuclear Information System (INIS)

    Thieberger, P.

    1990-05-01

    The BNL Booster, now nearing completion, was designed to inject protons and heavy ions into the Alternating Gradient Synchrotron (AGS) for further acceleration. In the future, ion beams from the AGS will in turn be further accelerated in the Relativistic Heavy Ion Collider (RHIC). Given the wide range of ion masses, energies and beam intensities the Booster will generate, other important applications should be considered. Dedicated use of the Booster for such applications may be possible during limited periods. However shared use would be preferable from the points of view of availability, affordability and efficiency. While heavy ions of a given isotope are injected into the AGS, the same or other ion species from the Booster could be simultaneously delivered to a new irradiation area for treatment of patients, testing of electronic devices or other applications and research. To generate two different beam species, ion sources on both Tandem accelerators would be used; one for AGS injection and the other one for a time-sharing application. Since the beam transport from the Tandems to the Booster can not be rapidly adjusted, it will be necessary to select beams of identical magnetic rigidity. The present study was performed to determine to what extent this compatibility requirement imposes limitations on the available ion species, energies and/or intensities

  15. Construction and operation of a 10 MeV electron accelerator and associated experimental facilities at Brookhaven National Laboratory, Upton, New York. Environmental assessment

    International Nuclear Information System (INIS)

    1994-02-01

    The purpose of this environmental impact statement is to determine whether there would be significant environmental impacts associated with the construction of an experimental facility at Brookhaven National Laboratory for radiation chemistry research and operation of the 10-MeV electron accelerator proposed for it. The document describes the need for action, alternative actions, the affected environment, and potential environmental impacts

  16. Brookhaven Highlights, January 1982-March 1983

    Energy Technology Data Exchange (ETDEWEB)

    Kuper, J.B.H.; Rustad, M.C. (eds.)

    1983-01-01

    Research at Brookhaven National Laboratory is summarized. Major headings are high energy physics, physics and chemistry, life sciences, applied energy science, support activities and administration. (GHT)

  17. Retrospective review of the clinical BNCT trial at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Diaz, A.Z.; Chanana, A.D.; Coderre, J.A.; Ma, R.

    2000-01-01

    The primary objective of the phase I/II dose escalation studies was to evaluate the safety of the boronophenylalanine-fructose (BPA-F) mediated boron neutron capture therapy (BNCT) in subjects with glioblastoma multiforme (GBM). A secondary objective was to retrospectively assess the palliation of GBM by BNCT. Fifty-three subjects with GBM were treated under multiple dose escalation protocols at the Brookhaven Medical Research Reactor (BMRR). Twenty-six subjects were treated using one field, 17 subjects were treated using 2 fields and 10 subjects were treated using 3 fields. BPA-F related toxicity was not observed. The maximum radiation dose to a volume of approximately 1 cc of the normal brain varied from 8.9 to 15.9 gray-equivalent (Gy-Eq). The volume-weighted average radiation dose to normal brain varied from 1.9 to 9.5 Gy-Eq. Six RTOG (Radiation Therapy Oncology Group) grade 3 or 4 toxicities were attributed to BNCT. Four of the 53 subjects are still alive with 3 of them free of recurrent disease with over two years follow-up. The median times to progression and median survival time from diagnosis were 28.4 weeks and 12.8 months respectively. (author)

  18. Advanced R ampersand D for electron and photon beams at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Kirk, H.G.

    1989-08-01

    The Brookhaven Accelerator Test Facility consists of a 50-MeV linear accelerator and a laser system capable of generating short (a few picoseconds) laser pulses at both UV (266 nm) and infrared (10 μm) wavelengths. With these systems in place, the ATF has unique capabilities for the study of fundamental interactions between charged-particle beams and intense electromagnetic radiation. The principal research goals of the Accelerator Test Facility (ATF) axe the following. Laser Acceleration Program: We wig study the principles and techniques of particle acceleration at ultra-high frequencies (up to 30 THz) and with very high acceleration gradients (up to 1 GV/m). Production of Coherent Radiation: We wish to develop the next generation of photon sources with features like (a) short pulses (picoseconds or less), (b) coherence, and (c) high peak power. All of these attributes can be provided by free-electron lasers. High-brightness sources: A common denominator for the above programs is the need for electron beams with very small transverse and longitudinal emittances. We will devote a substantial amount of our resources to the production and understanding of electron beams that have these attributes. We will build advanced electron sources such as switched-power devices and rf guns with photocathodes. Important applications of this line of research include the development of high-luminosity linear colliders and free-electron lasers in the XUV regime

  19. ACCELERATED SITE TECHNOLOGY DEPLOYMENT COST AND PERFORMANCE REPORT COMPARABILITY OF ISOCS INSTRUMENT IN RADIONUCLIDE CHARACTERICATION AT BROOKHAVEN NATIONAL LABORATORY

    Energy Technology Data Exchange (ETDEWEB)

    KALB,P.; LUCKETT,L.; MILLER,K.; GOGOLAK,C.; MILIAN,L.

    2001-03-01

    This report describes a DOE Accelerated Site Technology Deployment project being conducted at Brookhaven National Laboratory to deploy innovative, radiological, in situ analytical techniques. The technologies are being deployed in support of efforts to characterize the Brookhaven Graphite Research Reactor (BGRR) facility, which is currently undergoing decontamination and decommissioning. This report focuses on the deployment of the Canberra Industries In Situ Object Counting System (ISOCS) and assesses its data comparability to baseline methods of sampling and laboratory analysis. The battery-operated, field deployable gamma spectrometer provides traditional spectra of counts as a function of gamma energy. The spectra are then converted to radionuclide concentration by applying innovative efficiency calculations using monte carlo statistical methods and pre-defined geometry templates in the analysis software. Measurement of gamma emitting radionuclides has been accomplished during characterization of several BGRR components including the Pile Fan Sump, Above Ground Ducts, contaminated cooling fans, and graphite pile internals. Cs-137 is the predominant gamma-emitting radionuclide identified, with smaller quantities of Co-60 and Am-241 detected. The Project used the Multi-Agency Radiation Survey and Site Investigation Manual guidance and the Data Quality Objectives process to provide direction for survey planning and data quality assessment. Analytical results have been used to calculate data quality indicators (DQI) for the ISOCS measurements. Among the DQIs assessed in the report are sensitivity, accuracy, precision, bias, and minimum detectable concentration. The assessment of the in situ data quality using the DQIs demonstrates that the ISOCS data quality can be comparable to definitive level laboratory analysis when the field instrument is supported by an appropriate Quality Assurance Project Plan. A discussion of the results obtained by ISOCS analysis of

  20. ACCELERATED SITE TECHNOLOGY DEPLOYMENT COST AND PERFORMANCE REPORT COMPARABILITY OF ISOCS INSTRUMENT IN RADIONUCLIDE CHARACTERICATION AT BROOKHAVEN NATIONAL LABORATORY

    International Nuclear Information System (INIS)

    KALB, P.; LUCKETT, L.; MILLER, K.; GOGOLAK, C.; MILIAN, L.

    2001-01-01

    This report describes a DOE Accelerated Site Technology Deployment project being conducted at Brookhaven National Laboratory to deploy innovative, radiological, in situ analytical techniques. The technologies are being deployed in support of efforts to characterize the Brookhaven Graphite Research Reactor (BGRR) facility, which is currently undergoing decontamination and decommissioning. This report focuses on the deployment of the Canberra Industries In Situ Object Counting System (ISOCS) and assesses its data comparability to baseline methods of sampling and laboratory analysis. The battery-operated, field deployable gamma spectrometer provides traditional spectra of counts as a function of gamma energy. The spectra are then converted to radionuclide concentration by applying innovative efficiency calculations using monte carlo statistical methods and pre-defined geometry templates in the analysis software. Measurement of gamma emitting radionuclides has been accomplished during characterization of several BGRR components including the Pile Fan Sump, Above Ground Ducts, contaminated cooling fans, and graphite pile internals. Cs-137 is the predominant gamma-emitting radionuclide identified, with smaller quantities of Co-60 and Am-241 detected. The Project used the Multi-Agency Radiation Survey and Site Investigation Manual guidance and the Data Quality Objectives process to provide direction for survey planning and data quality assessment. Analytical results have been used to calculate data quality indicators (DQI) for the ISOCS measurements. Among the DQIs assessed in the report are sensitivity, accuracy, precision, bias, and minimum detectable concentration. The assessment of the in situ data quality using the DQIs demonstrates that the ISOCS data quality can be comparable to definitive level laboratory analysis when the field instrument is supported by an appropriate Quality Assurance Project Plan. A discussion of the results obtained by ISOCS analysis of

  1. SDRC I-DEAS and RHIC (Relativistic Heavy Ion Collider)

    International Nuclear Information System (INIS)

    Goggin, C.M.

    1989-01-01

    In August 1984, Brookhaven National Laboratory submitted a proposal to the Department of Energy (DOE) for the construction of a Relativistic Heavy Ion Collider (RHIC). Since then funding has continued for the detailed design of RHIC. The hardware for RHIC consists of two concentric rings of superconducting magnets in a 2.4 mile circumference with six intersections. Bunches of ions will travel in opposite directions in each of the two rings and eventually collide head on at one of the six intersections. The hardware design involves complicated facilities for liquid helium cryogens, cryostat design, and pipe systems. The greatest challenge however is the ion beam position relative to the geometric center of the rings. There are three hundred and seventy-two dipole magnets that are ten meters long and weigh 4300 Kg (4.5 tons) each. Each dipole must be positioned in the ring to ± 0.5 mm. In addition, there are four hundred and ninety-two quadrupole magnets that must be positioned to ± 0.1 mm which is a total position error. This total position error includes all the surveying and part tolerance. To accomplish this task requires detailed planning and design of the cryostats which contain each magnet and the tunnel assembly throughout the 2.4 mile circumference. The IDEAS' software package provides a way to analyze this large scale problem. 11 figs

  2. Brookhaven National Laboratory source water assessment for drinking water supply wells

    International Nuclear Information System (INIS)

    Bennett, D.B.; Paquette, D.E.; Klaus, K.; Dorsch, W.R.

    2000-01-01

    The BNL water supply system meets all water quality standards and has sufficient pumping and storage capacity to meet current and anticipated future operational demands. Because BNL's water supply is drawn from the shallow Upper Glacial aquifer, BNL's source water is susceptible to contamination. The quality of the water supply is being protected through (1) a comprehensive program of engineered and operational controls of existing aquifer contamination and potential sources of new contamination, (2) groundwater monitoring, and (3) potable water treatment. The BNL Source Water Assessment found that the source water for BNL's Western Well Field (comprised of Supply Wells 4, 6, and 7) has relatively few threats of contamination and identified potential sources are already being carefully managed. The source water for BNL's Eastern Well Field (comprised of Supply Wells 10, 11, and 12) has a moderate number of threats to water quality, primarily from several existing volatile organic compound and tritium plumes. The g-2 Tritium Plume and portions of the Operable Unit III VOC plume fall within the delineated source water area for the Eastern Well Field. In addition, portions of the much slower migrating strontium-90 plumes associated with the Brookhaven Graphite Research Reactor, Waste Concentration Facility and Building 650 lie within the Eastern source water area. However, the rate of travel in the aquifer for strontium-90 is about one-twentieth of that for tritium and volatile organic compounds. The Laboratory has been carefully monitoring plume migration, and has made adjustments to water supply operations. Although a number of BNL's water supply wells were impacted by VOC contamination in the late 1980s, recent routine analysis of water samples from BNL's supply wells indicate that no drinking water standards have been reached or exceeded. The high quality of the water supply strongly indicates that the operational and engineered controls implemented over the past

  3. Workshop on the RHIC performance

    Energy Technology Data Exchange (ETDEWEB)

    Khiari, F.; Milutinovic, J.; Ratti, A.; Rhoades-Brown, M.J. (eds.)

    1988-07-01

    The most recent conceptual design manual for the Relativistic Heavy Ion Collider (RHIC) at Brookhaven was published in May 1986 (BNL 51932). The purpose of this workshop was to review the design specifications in this RHIC reference manual, and to discuss in detail possible improvements in machine performance by addressing four main areas. These areas are beam-beam interactions, stochastic cooling, rf and bunch instabilities. The contents of this proceedings are as follows. Following an overview of the workshop, in which the motivation and goals are discussed in detail, transcripts of the first day talks are given. Many of these transcripts are copies of the original transparencies presented at the meeting. The following four sections contain contributed papers, that resulted from discussions at the workshop within each of the four working groups. In addition, there is a group summary for each of the four working groups at the beginning of each section. Finally, a list of participants is given.

  4. PROCEEDINGS OF RIKEN BNL RESEARCH CENTER, VOLUME 37, RHIC SPIN COLLABORATION MEETING VI (PART 2)

    International Nuclear Information System (INIS)

    Bland, L.; Saito, N.

    2001-01-01

    The second part of the sixth RHIC Spin Collaboration (RSC) meeting was held on November 15, 2001 at Brookhaven National Laboratory. Previous meetings have elaborated on the new generation of proton spin-structure studies (e.g. gluon polarization and flavor separation of q and bar q polarizations via real W ± production) enabled by studying polarized proton collisions at energies and momentum transfers where perturbative QCD models are expected to be applicable. The focus of this meeting was on many of the experimental issues that must be resolved to achieve these physics goals. This summary is written with the benefit of hindsight following the completion of the first-ever run of a polarized proton collider. This first run can be considered as a successfully completed milestone of the RHIC Spin Collaboration. Other milestones remain important. Long term machine items were identified in Waldo Mackay's talk, the most important being the completion of the spin rotator magnets that will be installed in 2002 to allow the flexible orientation of the proton beam polarization at the PHENM and STAR experiments. At the meeting Waldo discussed a stronger partial snake magnet for the AGS as a means of producing highly polarized proton beams to inject into RHIC. Developments subsequent to this meeting suggest that a superconducting helical dipole magnet may be feasible for the AGS, and is likely to be needed to achieve the 70% beam polarization in RHIC. Longer term items were also presented, including potential increases in luminosity by the addition of electron cooling to RHIC and the possibility of increasing the collision energy by ∼20% by replacement of the DX magnets. These items could be considered for a second generation of RHIC spin experiments. The other topics covered at the meeting were related to polarimetry and to the absolute calibration of the proton beam polarization in RHIC. These topics were divided into short- and long-term solutions to polarimetry issues

  5. PROCEEDINGS OF RIKEN BNL RESEARCH CENTER, VOLUME 37, RHIC SPIN COLLABORATION MEETING VI (PART 2).

    Energy Technology Data Exchange (ETDEWEB)

    BLAND, L.; SAITO, N.

    2001-11-15

    The second part of the sixth RHIC Spin Collaboration (RSC) meeting was held on November 15, 2001 at Brookhaven National Laboratory. Previous meetings have elaborated on the new generation of proton spin-structure studies (e.g. gluon polarization and flavor separation of q and {bar q} polarizations via real W{sup {+-}} production) enabled by studying polarized proton collisions at energies and momentum transfers where perturbative QCD models are expected to be applicable. The focus of this meeting was on many of the experimental issues that must be resolved to achieve these physics goals. This summary is written with the benefit of hindsight following the completion of the first-ever run of a polarized proton collider. This first run can be considered as a successfully completed milestone of the RHIC Spin Collaboration. Other milestones remain important. Long term machine items were identified in Waldo Mackay's talk, the most important being the completion of the spin rotator magnets that will be installed in 2002 to allow the flexible orientation of the proton beam polarization at the PHENM and STAR experiments. At the meeting Waldo discussed a stronger partial snake magnet for the AGS as a means of producing highly polarized proton beams to inject into RHIC. Developments subsequent to this meeting suggest that a superconducting helical dipole magnet may be feasible for the AGS, and is likely to be needed to achieve the 70% beam polarization in RHIC. Longer term items were also presented, including potential increases in luminosity by the addition of electron cooling to RHIC and the possibility of increasing the collision energy by {approx}20% by replacement of the DX magnets. These items could be considered for a second generation of RHIC spin experiments. The other topics covered at the meeting were related to polarimetry and to the absolute calibration of the proton beam polarization in RHIC. These topics were divided into short- and long-term solutions to

  6. MACHINE PROTECTION SYSTEM FOR CONCURRENT OPERATION OF RHIC AND BLIP

    International Nuclear Information System (INIS)

    WILINSKI, M.; BELLAVIA, S.; GLENN, J.W.; MAUSNER, L.F.; UNGER, K.L.

    2005-01-01

    The Brookhaven 200MeV linac is a multipurpose machine used to inject low intensity polarized protons for RHIC (Relativistic Heavy Ion Collider), as well as to inject high intensity protons to BLIP (Brookhaven Linac Isotope Producer), a medical isotope production facility. If high intensity protons were injected to RHIC by mistake, administrative radiation limits could be exceeded or sensitive electronics could be damaged. In the past, the changeover from polarized proton to high intensity proton operation has been a lengthy process, thereby never allowing the two programs to run simultaneously. To remedy this situation and allow concurrent operation of RHIC and BLIP, an active interlock system has been designed to monitor current levels in the AGS using two current transformers with fail safe circuitry and associated electronics to inhibit beam to RHIC if high intensity currents are detected

  7. sPHENIX: The next generation heavy ion detector at RHIC

    Science.gov (United States)

    Campbell, Sarah; sPHENIX Collaboration

    2017-04-01

    sPHENIX is a new collaboration and future detector project at Brookhaven National Laboratory’s Relativistic Heavy Ion Collider (RHIC). It seeks to answer fundamental questions on the nature of the quark gluon plasma (QGP), including its coupling strength and temperature dependence, by using a suite of precision jet and upsilon measurements that probe different length scales of the QGP. This is possible with a full acceptance, |η| superconducting magnet. With the increased luminosity afforded by accelerator upgrades, sPHENIX is going to perform high statistics measurements extending the kinematic reach at RHIC to overlap the LHC’s. This overlap is going to facilitate a better understanding of the role of temperature, density and parton virtuality in QGP dynamics and, specifically, jet quenching. This paper focuses on key future measurements and the current state of the sPHENIX project.

  8. Heavy ion program at BNL: AGS, RHIC [Relativistic Heavy Ion Collider

    International Nuclear Information System (INIS)

    Barton, D.S.

    1987-01-01

    With the recent commissioning of fixed target, heavy ion physics at the AGS, Brookhaven National Laboratory (BNL) has embarked on a long range program in support of relativistic heavy ion research. Acceleration of low mass heavy ions (up to sulfur) to an energy of about 14.5 GeV/nucleon is possible with the direct connection of the BNL Tandem Van de Graaff and AGS accelerators. When completed, the new booster accelerator will provide heavy ions over the full mass range for injection and subsequent acceleration in the AGS. BNL is now engaged in an active R and D program directed toward the proposed Relativistic Heavy Ion Collider (RHIC). The results of the first operation of the low mass heavy ion program will be reviewed, and future expectations discussed. The expected performance for the heavy ion operation of the booster will be described and finally, the current status and outlook for the RHIC facility will be presented

  9. Capture from pair production as a beam loss mechanism for heavy ions at RHIC

    International Nuclear Information System (INIS)

    Feinberg, B.; Belkacem, A.; Claytor, N.; Dinneen, T.; Gould, H.

    1997-05-01

    Electron capture from electron-positron pair production is predicted to be a major source of beam loss for the heaviest ions at RHIC. Achieving the highest luminosity thus requires an understanding of the capture process. The authors report measurements of this process at Brookhaven National Laboratory's AGS using 10.8 GeV/nucleon Au 79+ projectiles on Au targets. Capture from pair production is a process in which the very high electromagnetic field involved in the collision of two relativistic heavy ions results in the production of an electron-positron pair with the capture of the electron by one of the ions. There are many theoretical papers published on capture from pair production with discrepancies between predicted cross sections. The experimental results are compared to theory and to previous experiments at 1 GeV/nucleon. The implications of extrapolations to RHIC energies are presented

  10. Probing the Big Bang at the Relativistic Heavy Ion Collider (RHIC) (or Probing the Big Bang 13.7 billion years later)

    International Nuclear Information System (INIS)

    Lee, David M

    2010-01-01

    The Relativistic Heavy Ion Collider (RHIC) at the Brookhaven National Laboratory in the USA is a variable energy proton-proton and ion-ion collider that is the first accelerator capable of colliding heavy ions. RHIC was designed to do experiments that provide important information about the Standard Model of particle physics, Quantum Chromodynamics (QCD). QCD predicts that in the early part of the Universe just after the Big Bang the world consisted of a Quark Gluon Plasma, a weakly interacting collection of quarks and gluons. At RHIC we can recreate the conditions of the early Universe by colliding heavy ions at 200 GeV. This paper will give a general overview of the physics motivation for studying the QGP, how our experiments are designed to study the QGP, what we have learned over the last 9 years, and what the future holds.

  11. Heavy ion physics at BNL, the AGS and RHIC

    International Nuclear Information System (INIS)

    Lowenstein, D.I.

    1985-01-01

    The advent of heavy ion acceleration with the AGS at Brookhaven National Laboratory in 1986 and the proposed Relativistic Heavy Ion Collider (RHIC) for 1990 brings us into a temperature and density regime well above anything yet produced and into a time domain of the early universe of 10 -13 -10 -6 seconds. The physics of high energy heavy ions range from the more traditional nuclear physics to the formation of new forms of matter. Quantum Chromodynamics (QCD) is the latest, and as of yet, the most successful theory to describe the interaction of quarks and gluons. The nature of the confinement of the quarks and gluons under extremes of temperature and density is one of the compelling reasons for this new physics program at BNL. There are reasons to believe that with collisions of heavy nuclei at energies in the 10 to 100 GeV/amu range a very large volume of approx. 10 fm 3 would be heated to 200-300 MeV and/or acquire a sufficient quark density (5-10 times normal baryon density) so that the entire contents of the volume would be deconfined and the quarks and gluons would form a plasma. The kinematic region for the extant machines and the proposed RHIC are shown. At AGS energies the baryons in colliding nuclei bring each other to rest, yielding fragmentation regions of high baryon density. These are the regions in which supernorvae and neutrons stars exist. For energies much higher, such as in RHIC, nuclei are transparent to each other and one can form a central region of almost zero baryon density, mostly pions, and very high temperature. This is the region of the early universe and the quark-gluon plasma. Design parameters and cost of the RHIC are discussed

  12. Final environmental impact statement. Proton--Proton Storage Accelerator Facility (ISABELLE), Brookhaven National Laboratory, Upton, New York

    International Nuclear Information System (INIS)

    1978-08-01

    An Environmental Impact Statement for a proposed research facility (ISABELLE) to be built at Brookhaven National Laboratory (BNL) is presented. It was prepared by the Department of Energy (DOE) following guidelines issued for such analyses. In keeping with DOE policy, this statement presents a concise and issues-oriented analysis of the significant environmental effects associated with the proposed action. ISABELLE is a proposed physics research facility where beams of protons collide providing opportunities to study high energy interactions. The facility would provide two interlaced storage ring proton accelerators, each with an energy up to 400 GeV intersecting in six experimental areas. The rings are contained in a tunnel with a circumference of 3.8 km (2.3 mi). The facility will occupy 250 ha (625 acres) in the NW corner of the existing BNL site. A draft Environmental Impact Statement for this proposed facility was issued for public review and comment by DOE on February 21, 1978. The principal areas of concern expressed were in the areas of radiological impacts and preservation of cultural values. After consideration of these comments, appropriate actions were taken and the text of the statement has been amended to reflect the comments. The text was annotated to indicate the origin of the comment. The Appendices contain a glossary of terms and listings of metric prefixes and conversions and symbols and abbreviations

  13. Deadline pressure and human error: a study of human failures on a particle accelerator at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Tiagha, E.A.

    1982-01-01

    The decline in industrial efficiency may be linked to decreased reliability of complex automatic systems. This decline threatens the viability of complex organizations in industrialized economies. Industrial engineering techniques that minimize system failure by increasing the reliability of systems hardware are well developed in comparison with those available to reduce human operator errors. The problem of system reliability and the associated costs of breakdown can be reduced if we understand how highly skilled technical personnel function in complex operations and systems. The purpose of this research is to investigate how human errors are affected by deadline pressures, technical communication and other socio-dynamic factors. Through the analysis of a technologically complex particle accelerator prototype at Brookhaven National Laboratory, two failure mechanisms: (1) physical defects in the production process and (2) human operator errors were identified. Two instruments were used to collect information on human failures: objective laboratory data and a human failure questionnaire. The results of human failures from the objective data were used to test for the deadline hypothesis and also to validate the human failure questionnaire. To explain why the human failures occurred, data were collected from a four-part, closed choice questionnaire administered to two groups of scientists, engineers, and technicians, working together against a deadline to produce an engineering prototype of a particle accelerator

  14. Cathode cooling systems for the magnetron and Penning H- sources: a progress report of work at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    McKenzie-Wilson, R.B.

    1977-01-01

    The magnetron/Penning H - sources being developed at Brookhaven National Laboratory have produced ion currents up to 1 A with pulse lengths of 10 ms. The pulse length is limited by heating of the cathode surface. Cathode thermal conditions were investigated and lead to the conclusion that a cathode cooling system must be capable of handling 3 kW cm -2 of heated cathode surface. A review of cooling fluid requirements coupled with an examination of possible cooling fluids, leads to the conclusion that demineralized water is a suitable cooling fluid when used under pressurized nucleated boiling conditions. A correlation is used to show that heat-flux of 1.25 kW cm -2 could be removed using current technology and that this heat flux may be extended to 3 kW cm -2 by use of the Hyper-Vapotron effect. The temperature of the working surface of the cathode may be varied over a small temperature range by varying the system pressure during operation

  15. Laser ion source with long pulse width for RHIC-EBIS

    International Nuclear Information System (INIS)

    Kondo, K.; Kanesue, T.; Okamura, M.

    2011-01-01

    The Electron Beam Ion Source (EBIS) at Brookhaven National Laboratory is a new heavy ion-projector for RHIC and NASA Space Radiation Laboratory. Laser Ion Source (LIS) with solenoid can supply many kinds of ion from solid targets and is suitable for long pulse length with low current as ion provider for RHIC-EBIS. In order to understand a plasma behavior for fringe field of solenoid, we measure current, pulse width and total ion charges by a new ion probe. The experimental result indicates that the solenoid confines the laser ablation plasma transversely. Laser ion source needs long pulse length with limited current as primary ion provider for RHIC-EBIS. New ion probe can measure current distribution for the radial positions along z axis. The beam pulse length is not effected by magnetic field strength. However, the currents and charges decay with the distance from the end of solenoid. These results indicate that solenoid field has important role for plasma confinement not longitudinally but transversely and solenoid is able to have long pulse length with sufficient total ion charges. Moreover, the results are useful for a design of the extraction system for RHIC-EBIS.

  16. Brookhaven National Laboratory's capabilities for advanced analyses of cyber threats

    Energy Technology Data Exchange (ETDEWEB)

    DePhillips, M. P. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2014-01-01

    BNL has several ongoing, mature, and successful programs and areas of core scientific expertise that readily could be modified to address problems facing national security and efforts by the IC related to securing our nation’s computer networks. In supporting these programs, BNL houses an expansive, scalable infrastructure built exclusively for transporting, storing, and analyzing large disparate data-sets. Our ongoing research projects on various infrastructural issues in computer science undoubtedly would be relevant to national security. Furthermore, BNL frequently partners with researchers in academia and industry worldwide to foster unique and innovative ideas for expanding research opportunities and extending our insights. Because the basic science conducted at BNL is unique, such projects have led to advanced techniques, unlike any others, to support our mission of discovery. Many of them are modular techniques, thus making them ideal for abstraction and retrofitting to other uses including those facing national security, specifically the safety of the nation’s cyber space.

  17. Tests of an environmental and personnel safe cleaning process for Brookhaven National Laboratory accelerator and storage ring components

    International Nuclear Information System (INIS)

    Foerster, C.L.; Lanni, C.; Lee, R.; Mitchell, G.; Quade, W.

    1997-01-01

    A large measure of the successful operation of the National Synchrotron Light Source (NSLS) at Brookhaven National Laboratory (BNL) for over a decade can be attributed to the cleaning of its ultrahigh vacuum (UHV) components during and after construction. A new UHV cleaning process, which has to be environmentally and personnel safe, is needed to replace the harsh, unfriendly process which is still in use. Dow Advanced Cleaning Systems was contracted to develop a replacement process without the use of harsh chemicals and which must clean vacuum surfaces as well as the existing process. Acceptance of the replacement process was primarily based on photon stimulated desorption (PSD) measurements of beam tube samples run on NSLS beam line U10B. One meter long beam tube samples were fabricated from aluminum, 304 stainless steel, and oxygen-free copper. Initially, coupon samples were cleaned and passed preliminary testing for the proposed process. Next, beam tube samples of each material were cleaned, and the PSD measured on beam line U10B using white light with a critical energy of 487 eV. Prior to cleaning, the samples were contaminated with a mixture of cutting oils, lubricants, vacuum oils, and vacuum grease. The contaminated samples were then baked. Samples of each material were also cleaned with the existing process after the same preparation. Beam tube samples were exposed to between 10 22 and 10 23 photons per meter for a PSD measurement. Desorption yields for H 2 , CO, CO 2 , CH 4 , and H 2 O are reported for both the existing cleaning and for the replacement cleaning process. Preliminary data, residual gas scans, and PSD results are given and discussed. The new process is also compared with new cleaning methods developed in other laboratories. After modification, the new UHV cleaning process was accepted by BNL

  18. Proposed ultraviolet free-electron laser at Brookhaven National Laboratory: A source for time-resolved biochemical spectroscopy

    International Nuclear Information System (INIS)

    Johnson, E.D.; Sutherland, J.C.; Laws, W.R.

    1992-01-01

    Brookhaven National Laboratory is designing an ultraviolet free- electron laser (UV-FEL) user facility that will provide pico-second and sub-picosecond pulses of coherent ultraviolet radiation for wavelengths from 300 to 75 nm. Pulse width will be variable from abut 7 ps to ∼ 200 fs, with repetition rates as high as 10 4 Hz, single pulse energies > 1 mJ and hence peak pulse power >200 MW and average beam power > 10 W. The facility will be capable of ''pump-probe'' experiments utilizing the FEL radiation with: (1) synchronized auxiliary lasers, (2) a second, independently tunable FEL beam, or (3) broad-spectrum, high-intensity x-rays from the adjacent National Synchrotron Light Source. The UV-FEL consists of a high repetition rate recirculating superconducting linear accelerator which feeds pulses of electrons to two magnetic wigglers. Within these two devices, photons from tunable ''conventional'' laser would be frequency multiplied and amplified. By synchronously tuning the seed laser and modulating the energy of the electron beam, tuning of as much as 60% in wavelength is possible between alternating pulses supplied to different experimental stations, with Fourier transform limited resolution. Thus, up to four independent experiments may operate at one time, each with independent control of the wavelength and pulse duration. The UV-FEL will make possible new avenues of inquiry in time studies of diverse field including chemical, surface, and solid state physics, biology and materials science. The experimental area is scheduled to include a station dedicated to biological research. The complement of experimental and support facilities required by the biology station will be determined by the interests of the user community. 7 refs., 5 figs

  19. Ultra-high vacuum system of the Brookhaven National Synchrotron Light Source

    International Nuclear Information System (INIS)

    Foerster, C.L.

    1995-01-01

    The rings of the National Synchrotron Light Source (NSLS) have been supplying light to numerous users for approximately a decade and recently a fully conditioned machine vacuum at design currents was obtained. A brief description of the x-ray storage ring, the VUV storage ring and their current supply is given along with some of their features. The ultra-high vacuum system employed for the storage rings and their advantages for the necessary stored beam environments are discussed including, a brief history of time. 15 refs., 2 tabs., 8 figs

  20. Probabilistic risk assessment using event tables and the BNL [Brookhaven National Laboratory] event-tree analyzer

    International Nuclear Information System (INIS)

    Fullwood, R.R.; Shier, W.G.

    1989-01-01

    Probabilistic risk analysis (PRA) is being used to study design alternatives for the advanced neutron source research reactor being designed at Oak Ridge National Laboratory for operation in the 1990s. Major communication paths between the designers and the safety analysts are accident discussions supported by event tables, event-tree graphics, and accident sequence probabilities. The BETA code used in conjunction with a word processor provides this linkage. This paper describes the process, features of the BETA, how it works, and some examples of usage

  1. Programmed improvements of the alternating gradient synchrotron complex at Brookhaven National Laboratory, Upton, New York. Environmental assessment

    International Nuclear Information System (INIS)

    1994-03-01

    The purpose and need for DOE to undertake the actions described in this document are to improve the efficiency of the Alternating Gradient Synchrotron (AGS) complex. Benefits would include optimization of the AGS scientific program, increased high-energy and nuclear physics experimentation, improved health and safety conditions for workers and users, reduced impact on the environment and the general public, energy conservation, decreased generation of hazardous and radioactive wastes, and completion of actions required to permit the AGS to be the injector to the Relativistic Heavy Ion Collider (RHIC)., Improved efficiency is defined as increasing the AGS's capabilities to capture and accelerate the proton intensity transferred to the AGS from the AGS booster. Improved capture of beam intensity would reduce the beam losses which equate to lost scientific opportunity for study and increased potential for radiation doses to workers and the general public. The action would also refurbish magnets used in the transfer tunnel which connects the AGS complex to RHIC to permit smooth injection of beam into the RHIC accelerator. These magnets were previously used to direct beam to fixed targets for high energy physics studies but have hot received proper maintenance to be reliable as injectors to RHIC. The document describes alternative actions, the affected environment, and environmental impacts

  2. Development of an x-ray fluorescence microprobe at the National Synchrotron Light Source, Brookhaven National Laboratory: Early results: Comparison with data from other techniques

    International Nuclear Information System (INIS)

    Smith, J.V.; Rivers, M.L.; Sutton, S.R.; Jones, K.W.; Hanson, A.L.; Gordon, B.M.

    1986-01-01

    Theoretical predictions for the detection levels in x-ray fluorescence analysis with a synchrotron storage ring are being achieved experimentally at several laboratories. This paper is deliberately restricted to the state of development of the Brookhaven National Laboratory/University of Chicago instruments. Analyses at the parts per million (ppM) level are being made using white light apertured to 20 μm and an energy dispersive system. This system is particularly useful for elements with Z > 20 in materials dominated by elements with Z < 20. Diffraction causes an interference for crystalline materials. Development of a focusing microprobe for tunable monochromatic x-rays and a wavelength dispersive spectrometer (WDS) is delayed by problems in shaping an 8:1 focusing mirror to the required accuracy. Reconnaissance analyses with a wiggler source on the CHESS synchrotron have been made in the K spectrum up to Z = 80

  3. High luminosity polarized proton collisions at RHIC

    International Nuclear Information System (INIS)

    Roser, T.

    2001-01-01

    The Brookhaven Relativistic Heavy Ion Collider (RHIC) provides the unique opportunity to collide polarized proton beams at a center-of-mass energy of up to 500 GeV and luminosities of up to 2 x 10 32 cm -2 s -1 . Such high luminosity and high energy polarized proton collisions will open up the possibility of studying spin effects in hard processes. However, the acceleration of polarized beams in circular accelerators is complicated by the numerous depolarizing spin resonances. Using a partial Siberian snake and a rf dipole that ensure stable adiabatic spin motion during acceleration has made it possible to accelerate polarized protons to 25 GeV at the Brookhaven AGS. After successful operation of RHIC with gold beams polarized protons from the AGS have been successfully injected into RHIC and accelerated using a full Siberian snakes built from four superconducting helical dipoles. A new high energy proton polarimeter was also successfully commissioned. Operation with two snakes per RHIC ring is planned for next year

  4. Assessment of energy efficiency project financing alternatives for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    WDM Hunt; JC Hail; GP Sullivan

    2000-03-13

    Energy reduction goals for Federal agencies were first established in the National Energy Conservation Policy Act of 1988, and directed 10{percent} reduction in facility energy use based on a 1985 baseline. Since that time, Federal sites have been actively seeking and implementing a wide variety of energy-efficiency measures in facilities across the Federal sector. In the intervening years this energy reduction goal has been progressively increased to 20{percent} through legislation (Public Law 102-486, The Energy Policy Act of 1992) and a number of Executive Orders. Executive Order 13123, Greening the Government Through Efficient Energy management (signed June 3, 1999), further increased the facility energy-efficiency improvement goal from 30{percent} in 2005 to 35{percent} by 2010 relative to the 1985 baseline.

  5. Multi-MW accelerator target material properties under proton irradiation at Brookhaven National Laboratory linear isotope producer

    Science.gov (United States)

    Simos, N.; Ludewig, H.; Kirk, H.; Dooryhee, E.; Ghose, S.; Zhong, Z.; Zhong, H.; Makimura, S.; Yoshimura, K.; Bennett, J. R. J.; Kotsinas, G.; Kotsina, Z.; McDonald, K. T.

    2018-05-01

    The effects of proton beams irradiating materials considered for targets in high-power accelerator experiments have been studied using the Brookhaven National Laboratory's (BNL) 200 MeV proton linac. A wide array of materials and alloys covering a wide range of the atomic number (Z) are being scoped by the high-power accelerator community prompting the BNL studies to focus on materials representing each distinct range, i.e. low-Z, mid-Z and high-Z. The low range includes materials such as beryllium and graphite, the midrange alloys such as Ti-6Al-4V, gum metal and super-Invar and finally the high-Z range pure tungsten and tantalum. Of interest in assessing proton irradiation effects are (a) changes in physiomechanical properties which are important in maintaining high-power target functionality, (b) identification of possible limits of proton flux or fluence above which certain materials cease to maintain integrity, (c) the role of material operating temperature in inducing or maintaining radiation damage reversal, and (d) phase stability and microstructural changes. The paper presents excerpt results deduced from macroscopic and microscopic post-irradiation evaluation (PIE) following several irradiation campaigns conducted at the BNL 200 MeV linac and specifically at the isotope producer beam-line/target station. The microscopic PIE relied on high energy x-ray diffraction at the BNL NSLS X17B1 and NSLS II XPD beam lines. The studies reveal the dramatic effects of irradiation on phase stability in several of the materials, changes in physical properties and ductility loss as well as thermally induced radiation damage reversal in graphite and alloys such as super-Invar.

  6. Aerial radiological survey of the Brookhaven National Laboratory and surrounding area, Upton, New York. Date of survey: June 1983

    International Nuclear Information System (INIS)

    Hobaugh, J.L.

    1985-02-01

    An aerial radiological survey was performed from 11 to 13 June 1983, over approximately a 64-square-kilometer (25-square-mile) area surrounding the Brookhaven National Laboratory (BNL). BNL is located in the center of Suffolk County, Long Island, New York. All gamma radiation data were collected by flying east-west lines spaced 76 meters (250 feet) apart at an altitude of 46 meters (150 feet) above ground level. Count rates obtained from the aerial platform were converted to exposure rates at 1 meter above the ground. The average background exposure rate in the survey area ranged from 5 to 10 microroentgens per hour (μR/h). The reported exposure rate values include an estimated cosmic ray contribution of 4.0 μR/h. Ground-based measurements made during the same time period were compared to the aerial survey results. Pressurized ion chamber readings and soil samples were taken from two locations within the aerial survey boundaries. Exposure rate values obtained from these measurement techniques were in agreement with those obtained from the aerial data. A total of 23 areas of man-made radioactivity were identified. The dominant isotopes found over these areas were cesium-137, sodium-22, manganese-54, and cobalt-60. A similar survey was conducted in May 1980. The 1983 survey results were similar to the 1980 results. Three areas of low level man-made activity were not reproduced by the 1983 data. Ten new areas were detected. The major difference occurred because of the increased sensitivity and spatial reduction brought on by lowering the altitude and decreasing the line spacing. 8 refs., 28 figs., 4 tabs

  7. CSEWG SYMPOSIUM, A CSWEG RETROSPECTIVE. 35TH ANNIVERSARY CROSS SECTION EVALUATION WORKING GROUP, NOV. 5, 2001, BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    DUNFORD, C.; HOLDEN, N.; PEARLSTEIN, S.

    2001-11-05

    This publication has been prepared to record some of the history of the Cross Section Evaluation Working Group (CSEWG). CSEWG is responsible for creating the evaluated nuclear data file (ENDF/B) which is widely used by scientists and engineers who are involved in the development and maintenance of applied nuclear technologies. This organization has become the model for the development of nuclear data libraries throughout the world. The data format (ENDF) has been adopted as the international standard. On November 5, 2001, a symposium was held at Brookhaven National Laboratory to celebrate the 50 th meeting of the CSEWG organization and the 35 th anniversary of its first meeting in November 1966. The papers presented in this volume were prepared by present and former CSEWG members for presentation at the November 2001 symposium. All but two of the presentations are included. I have included an appendix to list all of the CSEWG members and their affiliations, which has been compiled from the minutes of each of the CSEWG meetings. Minutes exist for all meetings except the 4 th meeting held in January 1968. The list includes 348 individuals from 71 organizations. The dates for each of the 50 CSEWG meetings are listed. The committee structure and chairmen of all committees and subcommittees are also included in the appendix. This volume is dedicated to three individuals whose foresight and talents made CSEWG possible and successful. They are Henry Honeck who lead the effort to develop the ENDF format and the CSEWG system, Ira Zartman, the Atomic Energy Commission program manager who provided the programmatic direction and support, and Sol Pearlstein who led the development of the CESWG organization and the ENDF/B evaluated nuclear data library.

  8. Ultra-high vacuum system of the Brookhaven National Synchrotron Light Source

    Energy Technology Data Exchange (ETDEWEB)

    Foerster, C.L.

    1995-12-31

    The rings of the National Synchrotron Light Source (NSLS) have been supplying light to numerous users for approximately a decade and we recently enjoyed a fully conditioned machine vacuum at design currents. A brief description of the X-Ray storage ring, the VUV storage ring and their current supply is given along with some of their features. The ultra-high vacuum system employed for the storage rings and their advantages for the necessary stored beam environments are discussed including, a brief history of time. After several hundred amp hours of stored beam current operation, very little improvement in machine performance was seen due to conditioning. Sections of the rings were vented, to dry nitrogen and replacement components were pre-baked and pre-argon glow conditioned prior to installation. Very little machine conditioning was needed to return to operation after recovering vacuum due to well established conditioning procedures. All straight sections in the X-Ray ring and the VUV ring have been filled with various insertion devices and most are fully operational. Each storage ring has a computer controlled total pressure and partial pressure monitoring system for the ring and its beam ports, to insure good vacuum.

  9. Unusual dileptions at RHIC a field theoretic approach based on a non-equilibrium chiral phase transition

    International Nuclear Information System (INIS)

    Cooper, F.

    1997-01-01

    This paper contains viewgraphs on unusual dileptons at Brookhaven RHIC. A field theory approach is used based on a non-equilibrium chiral phase transformation utilizing the schroedinger and Heisenberg picture

  10. Unusual dileptions at RHIC a field theoretic approach based on a non-equilibrium chiral phase transition

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, F. [Los Alamos National Labs., NM (United States)

    1997-09-22

    This paper contains viewgraphs on unusual dileptons at Brookhaven RHIC. A field theory approach is used based on a non-equilibrium chiral phase transformation utilizing the schroedinger and Heisenberg picture.

  11. The Brookhaven Accelerator Test Facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Ben-Zvi, I.; Fernow, R.C.; Fischer, J.; Fisher, A.S.; Gallardo, J.; Jialin, Xie; Kirk, H.G.; Parsa, Z.; Palmer, R.B.; Rao, T.; Rogers, J.; Sheehan, J.; Tsang, T.Y.F.; Ulc, S.; Van Steenbergen, A.; Woodle, M.; Zhang, R.S.; McDonald, K.T.; Russell, D.P.; Jiang, Z.Y.; Pellegrini, C.; Wang, X.J.

    1990-01-01

    The Accelerator Test Facility (ATF), presently under construction at Brookhaven National laboratory, is described. It consists of a 50-MeV electron beam synchronizable to a high-peak power CO 2 laser. The interaction of electrons with the laser field will be probed, with some emphasis on exploring laser-based acceleration techniques. 5 refs., 2 figs

  12. Brookhaven highlights, 1986-1987

    International Nuclear Information System (INIS)

    Rowe, M.S.

    1988-01-01

    The highlights of research conducted between October 1985 and September 1987 at Brookhaven National Laboratory are reviewed in this publication. Also covered are the administrative and financial status of the laboratory and a brief mention of meetings held and honors received. (FI)

  13. Proceedings of the symposium on RHIC detector R ampersand D

    International Nuclear Information System (INIS)

    Makdisi, Y.; Stevens, A.J.

    1991-01-01

    This report contains papers on the following topics: Development of Analog Memories for RHIC Detector Front-end Electronic Systems; Monolithic Circuit Development for RHIC at Oak Ridge National Laboratory; Highly Integrated Electronics for the STAR TPC; Monolithic Readout Circuits for RHIC; New Methods for Trigger Electronics Development; Neurocomputing methods for Pattern Recognition in Nuclear Physics; The Development of a Silicon Multiplicity Detector System; A Transition Radiation Detector for RHIC Featuring Accurate

  14. PROCEEDINGS FROM RIKEN-BNL RESEARCH CENTER WORKSHOP: PARITY-VIOLATING SPIN ASYMMETRIES AT RHIC

    International Nuclear Information System (INIS)

    VOGELSANG, W.; PERDEKAMP, M.; SURROW, B.

    2007-01-01

    as jet and W+charrn final states and spin asymmetries in Z production, were proposed and discussed. All of the talks attracted much interest and initiated active discussions. This was a very successful workshop. It stimulated many discussions and new collaborations. We are grateful to all participants and speakers for coming to the Center, and for their excellent work. The support provided for this workshop by Dr. N. Samios and his RIKEN-BNL Research Center has been magnificent, and we are very grateful for it. We thank Brookhaven National Laboratory and the U.S. Department of Energy for providing the facilities to hold the workshop. Finally, sincere thanks go to Jane Lysik for her efficient work on organizing and running the workshop

  15. Proceedings of RIKEN BNL Research Center Workshop: Progress in High-pT Physics at RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Bazilevsky, A.; Bland, L.; Vogelsang, W.

    2010-03-17

    . We had excellent presentations throughout and productive discussions, which showed the importance and unique value of the RHIC high-p{sub T} program. We are grateful to all participants for coming to BNL. The support provided by the RIKEN-BNL Research Center for this workshop has been magnificent, and we are most grateful for it. We also thank Brookhaven National Laboratory and the U.S. Department of Energy for providing additional support and for the facilities to hold this workshop. Finally, sincere thanks go to Pamela Esposito for her most efficient and tireless work in organizing and running the workshop.

  16. Study of thermodynamic and transport properties of strongly interacting matter in a color string percolation model at RHIC

    International Nuclear Information System (INIS)

    Sahoo, Pragati; Tiwari, Swatantra Kumar; De, Sudipan; Sahoo, Raghunath

    2017-01-01

    The main perspectives of Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory are to study the properties of the strongly interacting matter and to explore the conjectured Quantum Chromodynamics (QCD) phase diagram. Lattice QCD (lQCD) predicts a smooth crossover at vanishing baryon chemical potential (μ B ) and other QCD based theoretical models predicts first order phase transition at large μB. Searching of the Critical Point in the QCD phase diagram, finding the evidence and nature of phase transition, studying the properties of the matter formed in nuclear collisions as a function of √sNN are the main goals of RHIC. To investigate the nature of the matter produced at heavy-ion collisions, the thermodynamical and transport quantities like: energy density, shear viscosity etc. are studied. It is expected that the ratio of shear viscosity (η) to entropy density (s) would exhibit a minimum value near the QCD critical point

  17. PROCEEDINGS OF RIKEN BNL RESEARCH CENTER WORKSHOP, RHIC SPIN COLLABORATION MEETING VI, VOLUME 36

    International Nuclear Information System (INIS)

    BLAND, L.; SAITO, N.

    2001-01-01

    The sixth meeting of the RHIC Spin Collaboration (RSC) took place on October 1, 2001 at Brookhaven National Laboratory. RHIC is now in its second year of operation for physics production and the first polarized proton collision run at √s=200 GeV is expected to start in eight weeks. The RSC has developed a plan for this coming run through two previous meetings, RHIC Spin Physics III (August 3, 2000) and IV (October 13-14, 2000). We requested the following: two weeks of polarized proton studies in AGS, three weeks of polarized collider commissioning, and five weeks of polarized proton physics run. As a result, we have obtained all we asked and the above plans are implemented in the current operation schedule. The focus of the present meeting was to bring all involved in the RHIC Spin activities up-to-date on the progress of machine development, theory issues, and experimental issues. This meeting was right after the Program Advisory Committee (PAC) meeting and it started with the comments on the PAC discussion by Gerry Bunce, who was informed about the PAC deliberations by Tom Kirk. The PAC was fully supportive to complete the proposed spin program within the currently available budget for RHIC run 2 operations. Gerry further explained the expected luminosity to be ∫ Ldt = 0.5 pb -1 per week, reflecting the current machine status. The introductory session also had a talk from Werner Vogelsang that reviewed the progress in perturbative QCD theory focused on spin effects

  18. Review of the {sup 60}Co Source. Development Program at Brookhaven National Laboratory; Le Programme de Mise au Point des Sources au {sup 60}Co au Laboratoire National de Brookhaven; Obzor programmy po razrabotke istochnikov {sup 60}Co v brukkhejvenskoj natsional'noj laboratorii; El Programa de Preparacion de Fuentes de {sup 60}Co del Laboratorio Nacional de Brookhaven

    Energy Technology Data Exchange (ETDEWEB)

    Kuhl, O. A. [Brookhaven National Laboratory, Upton, NY (United States)

    1966-11-15

    Early in the 1950's, at the request of the United States Atomic Energy Commission, Brookhaven National Laboratory (BNL) undertook the development of radiation sources. These sources were mainly of two types: large tubes, and flat strips. Initially these were used for research at BNL. Later, other institutions were permitted to use the irradiation facilities designed for these sources. As interest grew, source-irradiator combinations were made available to other researchers. Shipping containers for sources were developed. Small hot cells and water-filled pools were constructed to utilize the sources. Methods of dosimetry, curie evaluation, and irradiator design for these sources are discussed in this paper. During the research stages, economics were not usually important; however, the trend toward large- scale radiation processing in the field of food, chemicals and medical supplies will require careful consideration of the technical and economic aspects of source design. The development of the BNL Standard Mark I and Mark II Sources, already in use in a number of' facilities, is to satisfy these important requirements. The Mark I and Mark II sources are interchangeable. An improvement in the Mark II element design is that the inner cladding is metallurgically bonded to the cobalt core. It is now possible, for the first time, to reactivate these source elements after a period of use. Individual strips are sized for easy arrangement in plaques of various dimensions and shapes. The design philosophy, fabrication techniques, and test procedures, together with source analysis and curie evaluation, are described. Comparisons are made with other source types currently in use and economical and technical advantages are discussed. (author) [French] A la demande de la Commission de l'energie atomique des Etats-Unis, le Laboratoire national de Brookhaven a entrepris des les annees 50 la mise au point de sources de rayonnement. Ces sources etaient principalement de deux types

  19. Type A verification report for the high flux beam reactor stack and grounds, Brookhaven National Laboratory, Upton, New York

    International Nuclear Information System (INIS)

    Harpenau, Evan M.

    2012-01-01

    The U.S. Department of Energy (DOE) Order 458.1 requires independent verification (IV) of DOE cleanup projects (DOE 2011). The Oak Ridge Institute for Science and Education (ORISE) has been designated as the responsible organization for IV of the High Flux Beam Reactor (HFBR) Stack and Grounds area at Brookhaven National Laboratory (BNL) in Upton, New York. The IV evaluation may consist of an in-process inspection with document and data reviews (Type A Verification) or a confirmatory survey of the site (Type B Verification). DOE and ORISE determined that a Type A verification of the documents and data for the HFBR Stack and Grounds: Survey Units (SU) 6, 7, and 8 was appropriate based on the initial survey unit classification, the walkover surveys, and the final analytical results provided by the Brookhaven Science Associates (BSA). The HFBR Stack and Grounds surveys began in June 2011 and were completed in September 2011. Survey activities by BSA included gamma walkover scans and sampling of the as-left soils in accordance with the BSA Work Procedure (BNL 2010a). The Field Sampling Plan - Stack and Remaining HFBR Outside Areas (FSP) stated that gamma walk-over surveys would be conducted with a bare sodium iodide (NaI) detector, and a collimated detector would be used to check areas with elevated count rates to locate the source of the high readings (BNL 2010b). BSA used the Mult- Agency Radiation Survey and Site Investigation Manual (MARSSIM) principles for determining the classifications of each survey unit. Therefore, SUs 6 and 7 were identified as Class 1 and SU 8 was deemed Class 2 (BNL 2010b). Gamma walkover surveys of SUs 6, 7, and 8 were completed using a 2 1/2 2 NaI detector coupled to a data-logger with a global positioning system (GPS). The 100% scan surveys conducted prior to the final status survey (FSS) sampling identified two general soil areas and two isolated soil locations with elevated radioactivity. The general areas of elevated activity

  20. Brookhaven highlights. [Fiscal year 1992, October 1, 1991--September 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, M.S.; Cohen, A.; Greenberg, D.; Seubert, L. [eds.

    1992-12-31

    This publication provides a broad overview of the research programs and efforts being conducted, built, designed, and planned at Brookhaven National Laboratory. This work covers a broad range of scientific disciplines. Major facilities include the Alternating Gradient Synchrotron (AGS), with its newly completed booster, the National Synchrotron Light Source (NSLS), the High Flux Beam Reactor (HFBR), and the RHIC, which is under construction. Departments within the laboratory include the AGS department, accelerator development, physics, chemistry, biology, NSLS, medical, nuclear energy, and interdepartmental research efforts. Research ranges from the pure sciences, in nuclear physics and high energy physics as one example, to environmental work in applied science to study climatic effects, from efforts in biology which are a component of the human genome project to the study, production, and characterization of new materials. The paper provides an overview of the laboratory operations during 1992, including staffing, research, honors, funding, and general laboratory plans for the future.

  1. Machine Protection System for Concurrent Operation of RHIC and BLIP

    CERN Document Server

    Wilinski, Michelle; Glenn, Joseph; Mausner, Leonard; Unger, Kerry

    2005-01-01

    The Brookhaven 200 MeV linac is a multipurpose machine used to inject low intensity polarized protons ultimately ending up in RHIC as well as to inject high intensity protons to BLIP, a medical isotope production facility. If high intensity protons were injected to RHIC by mistake, administrative radiation limits could be exceeded or sensitive electronics could be damaged. In the past, the changeover from polarized proton to high intensity proton operation has been a lengthy process, thereby never allowing the two programs to run simultaneously. To remedy this situation and allow for concurrent operation of RHIC and BLIP, an active interlock system has been designed to monitor current levels in the AGS using two current transformers with fail safe circuitry and associated electronics to inhibit beam to RHIC if high intensity is detected.

  2. Brookhaven highlights, October 1, 1989--September 30, 1990

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, M.S.; Cohen, A.; Greenberg, D.; Seubert, L.; Kuper, J.B.H. (eds.)

    1990-01-01

    This report discusses research being conducted at Brookhaven National Laboratory. Highlights from all the department are illustrated. The main topics are on accelerator development and applications. (LSP)

  3. Brookhaven segment interconnect

    International Nuclear Information System (INIS)

    Morse, W.M.; Benenson, G.; Leipuner, L.B.

    1983-01-01

    We have performed a high energy physics experiment using a multisegment Brookhaven FASTBUS system. The system was composed of three crate segments and two cable segments. We discuss the segment interconnect module which permits communication between the various segments

  4. Brookhaven Linac Isotope Producer

    Data.gov (United States)

    Federal Laboratory Consortium — The Brookhaven Linac Isoptope Producer (BLIP)—positioned at the forefront of research into radioisotopes used in cancer treatment and diagnosis—produces commercially...

  5. PHENIX CDR update: An experiment to be performed at the Brookhaven National Laboratory relativistic heavy ion collider. Revision

    International Nuclear Information System (INIS)

    1994-11-01

    The PHENIX Conceptual Design Report Update (CDR Update) is intended for use together with the Conceptual Design Report (CDR). The CDR Update is a companion document to the CDR, and it describes the collaboration's progress since the CDR was submitted in January 1993. Therefore, this document concentrates on changes, refinements, and decisions that have been made over the past year. These documents together define the baseline PHENIX detector that the collaboration intends to build for operation at RHIC startup. In this chapter the current status of the detector and its motivation are briefly described. In Chapters 2 and 3 the detector and the physics performance are more fully developed. In Chapters 4 through 13 the details of the present design status, the technology choices, and the construction costs and schedules are presented. The physics goals of PHENIX collaboration have remained exactly as they were described in the CDR. Primary among these is the detection of a new phase of matter, the quark-gluon plasma (QGP), and the measurement of its properties. The PHENIX experiment will measure many of the best potential QGP signatures to see if any or all of these physics variables show anomalies simultaneously due to the formation of the QGP

  6. PHENIX Conceptual Design Report. An experiment to be performed at the Brookhaven National Laboratory Relativistic Heavy Ion Collider

    Energy Technology Data Exchange (ETDEWEB)

    Nagamiya, Shoji; Aronson, Samuel H.; Young, Glenn R.; Paffrath, Leo

    1993-01-29

    The PHENIX Conceptual Design Report (CDR) describes the detector design of the PHENIX experiment for Day-1 operation at the Relativistic Heavy Ion Collider (RHIC). The CDR presents the physics capabilities, technical details, cost estimate, construction schedule, funding profile, management structure, and possible upgrade paths of the PHENIX experiment. The primary goals of the PHENIX experiment are to detect the quark-gluon plasma (QGP) and to measure its properties. Many of the potential signatures for the QGP are measured as a function of a well-defined common variable to see if any or all of these signatures show a simultaneous anomaly due to the formation of the QGP. In addition, basic quantum chromodynamics phenomena, collision dynamics, and thermodynamic features of the initial states of the collision are studied. To achieve these goals, the PHENIX experiment measures lepton pairs (dielectrons and dimuons) to study various properties of vector mesons, such as the mass, the width, and the degree of yield suppression due to the formation of the QGP. The effect of thermal radiation on the continuum is studied in different regions of rapidity and mass. The e{mu} coincidence is measured to study charm production, and aids in understanding the shape of the continuum dilepton spectrum. Photons are measured to study direct emission of single photons and to study {pi}{sup 0} and {eta} production. Charged hadrons are identified to study the spectrum shape, production of antinuclei, the {phi} meson (via K{sup +}K{sup {minus}} decay), jets, and two-boson correlations. The measurements are made down to small cross sections to allow the study of high p{sub T} spectra, and J/{psi} and {Upsilon} production. The PHENIX collaboration consists of over 300 scientists, engineers, and graduate students from 43 institutions in 10 countries. This large international collaboration is supported by US resources and significant foreign resources.

  7. Proceedings of RIKEN BNL Resarch Center Workshop: Fluctuations, Correlations and RHIC Low Energy Runs

    Energy Technology Data Exchange (ETDEWEB)

    Karsch, F.; Kojo, T.; Mukherjee, S.; Stephanov, M.; Xu, N.

    2011-10-27

    Most of our visible universe is made up of hadronic matter. Quantum Chromodynamics (QCD) is the theory of strong interaction that describes the hadronic matter. However, QCD predicts that at high enough temperatures and/or densities ordinary hadronic matter ceases to exist and a new form of matter is created, the so-called Quark Gluon Plasma (QGP). Non-perturbative lattice QCD simulations shows that for high temperature and small densities the transition from the hadronic to the QCD matter is not an actual phase transition, rather it takes place via a rapid crossover. On the other hand, it is generally believed that at zero temperature and high densities such a transition is an actual first order phase transition. Thus, in the temperature-density phase diagram of QCD, the first order phase transition line emanating from the zero temperature high density region ends at some higher temperature where the transition becomes a crossover. The point at which the first order transition line turns into a crossover is a second order phase transition point belonging to three dimensional Ising universality class. This point is known as the QCD Critical End Point (CEP). For the last couple of years the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory has been performing experiments at lower energies in search of the elusive QCD CEP. In general critical behaviors are manifested through appearance of long range correlations and increasing fluctuations associated with the presence of mass-less modes in the vicinity of a second order phase transition. Experimental signatures of the CEP are likely to be found in observables related to fluctuations and correlations. Thus, one of the major focuses of the RHIC low energy scan program is to measure various experimental observables connected to fluctuations and correlations. On the other hand, with the start of the RHIC low energy scan program, a flurry of activities are taking place to provide solid theoretical

  8. THE RHIC INJECTION SYSTEM.

    Energy Technology Data Exchange (ETDEWEB)

    FISCHER,W.; GLENN,J.W.; MACKAY,W.W.; PTITSIN,V.; ROBINSON,T.G.; TSOUPAS,N.

    1999-03-29

    The RHIC injection system has to transport beam from the AGS-to-RHIC transfer line onto the closed orbits of the RHIC Blue and Yellow rings. This task can be divided into three problems. First, the beam has to be injected into either ring. Second, once injected the beam needs to be transported around the ring for one turn. Third, the orbit must be closed and coherent beam oscillations around the closed orbit should be minimized. We describe our solutions for these problems and report on system tests conducted during the RHIC Sextant test performed in 1997. The system will be fully commissioned in 1999.

  9. BROOKHAVEN: High energy gold

    International Nuclear Information System (INIS)

    Bleser, Ed

    1992-01-01

    On April 24, Brookhaven's Alternating Gradient Synchrotron (AGS) started to deliver gold ions at 11.4 GeV per nucleon (2,000 GeV per ion) to experimenters who were delighted not only to receive the world's highest energy gold beam but also to receive it on schedule

  10. MEQALAC development at Brookhaven

    International Nuclear Information System (INIS)

    Gammel, G.; Brodowski, J.; Keane, J.; Maschke, A.; Meier, E.; Mobley, R.; Sanders, R.

    1981-01-01

    A novel method of transporting and accelerating high brightness ion beams, called MEQALAC, has been developed at Brookhaven. The concept and its motivation will be described first, with reference to other sources for detail, and then the performance of two operating MEQALAC's will be presented

  11. Derivation of residual radioactive material guidelines for 13 radionuclides present in Operable Unit IV at Brookhaven National Laboratory, Upton, New York

    International Nuclear Information System (INIS)

    Faillace, E.; Nimmagadda, M.; Yu, C.

    1994-12-01

    Residual radioactive material guidelines for 13 radionuclides (americium-241; cobalt-60; cesium-137; europium-152, -154, and -155; plutonium-238, -239, and -240; strontium-90; and uranium-234, -235, and -238) were derived for Operable Unit (OU) IV at Brookhaven National Laboratory. This site has been identified for remedial action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Single-nuclide guidelines were derived on the basis of the requirement that the 50-year committed effective dose equivalent to a hypothetical individual who lives or works in the immediate vicinity of OU IV should not exceed a dose constraint of 30 mrem/yr following remedial action for the current use and plausible future use scenarios or a dose limit of 100 mrem/yr for plausible but less likely future use scenarios. The US Department of Energy (DOE) residual radioactive material guideline computer code, RESRAD, was used in this evaluation; RESRAD implements the methodology described in the DOE manual for determining residual radioactive material guidelines. Four potential scenarios were considered; each assumed that, for a period of 1,000 years following remedial action, the site would be used without radiological restrictions. The four scenarios varied with regard to the type of site use, time spent at the site, and sources of food consumed

  12. Use of the NASA Space Radiation Laboratory at Brookhaven National Laboratory to Conduct Charged Particle Radiobiology Studies Relevant to Ion Therapy.

    Science.gov (United States)

    Held, Kathryn D; Blakely, Eleanor A; Story, Michael D; Lowenstein, Derek I

    2016-06-01

    Although clinical studies with carbon ions have been conducted successfully in Japan and Europe, the limited radiobiological information about charged particles that are heavier than protons remains a significant impediment to exploiting the full potential of particle therapy. There is growing interest in the U.S. to build a cancer treatment facility that utilizes charged particles heavier than protons. Therefore, it is essential that additional radiobiological knowledge be obtained using state-of-the-art technologies and biological models and end points relevant to clinical outcome. Currently, most such ion radiotherapy-related research is being conducted outside the U.S. This article addresses the substantial contributions to that research that are possible at the NASA Space Radiation Laboratory (NSRL) at Brookhaven National Laboratory (BNL), which is the only facility in the U.S. at this time where heavy-ion radiobiology research with the ion species and energies of interest for therapy can be done. Here, we briefly discuss the relevant facilities at NSRL and how selected charged particle biology research gaps could be addressed using those facilities.

  13. Brookhaven highlights, October 1979-September 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Highlights are given for the research areas of the Brookhaven National Laboratory. These areas include high energy physics, physics and chemistry, life sciences, applied energy science (energy and environment, and nuclear energy), and support activities (including mathematics, instrumentation, reactors, and safety). (GHT)

  14. Brookhaven highlights, October 1979-September 1980

    International Nuclear Information System (INIS)

    1980-01-01

    Highlights are given for the research areas of the Brookhaven National Laboratory. These areas include high energy physics, physics and chemistry, life sciences, applied energy science (energy and environment, and nuclear energy), and support activities (including mathematics, instrumentation, reactors, and safety)

  15. Spin Physics at RHIC

    International Nuclear Information System (INIS)

    Bland, L.C.

    2003-01-01

    The physics goals that will be addressed by colliding polarized protons at the Relativistic Heavy Ion Collider (RHIC) are described. The RHIC spin program provides a new generation of experiments that will unfold the quark, anti-quark and gluon contributions to the proton's spin. In addition to these longer term goals, this paper describes what was learned from the first polarized proton collisions at √(s)=200 GeV. These collisions took place in a five-week run during the second year of RHIC operation

  16. Proceedings of RIKEN BNL Research Center Workshop, RHIC Spin Physics V, Volume 32, February 21, 2001

    International Nuclear Information System (INIS)

    BUNCE, G.; SAITO, N.; VIGDOR, S.; ROSER, T.; SPINKA, H.; ENYO, H.; BLAND, L.C.; GURYN, W.

    2001-01-01

    The RIKEN BNL Research Center (RBRC) was established in April 1997 at Brookhaven National Laboratory. It is funded by the ''Rikagaku Kenkysho'' (RIKEN, The Institute of Physical and Chemical Research) of Japan. The Center is dedicated to the study of strong interactions, including spin physics, lattice QCD and RHIC physics through the nurturing of a new generation of young physicists. During the fast year, the Center had only a Theory Group. In the second year, an Experimental Group was also established at the Center. At present, there are seven Fellows and nine post dots in these two groups. During the third year, we started a new Tenure Track Strong Interaction Theory RHIC Physics Fellow Program, with six positions in the academic year 1999-2000; this program will increase to include eleven theorists in the next academic year, and, in the year after, also be extended to experimental physics. In addition, the Center has an active workshop program on strong interaction physics, about ten workshops a year, with each workshop focused on a specific physics problem. Each workshop speaker is encouraged to select few of the most important transparencies from his or her presentation, accompanied by a page of explanation. This material is collected at the end of the workshop by the organizer to form proceedings, which can therefore be available within a short time. The construction of a 0.6 teraflop parallel processor, which was begun at the Center on February 19, 1998, was completed on August 28, 1998

  17. sPHENIX: The next generation heavy ion detector at RHIC

    International Nuclear Information System (INIS)

    Campbell, Sarah

    2017-01-01

    sPHENIX is a new collaboration and future detector project at Brookhaven National Laboratory’s Relativistic Heavy Ion Collider (RHIC). It seeks to answer fundamental questions on the nature of the quark gluon plasma (QGP), including its coupling strength and temperature dependence, by using a suite of precision jet and upsilon measurements that probe different length scales of the QGP. This is possible with a full acceptance, | η | < 1 and 0-2 π in φ , electromagentic and hadronic calorimeters and precision tracking enabled by a 1.5 T superconducting magnet. With the increased luminosity afforded by accelerator upgrades, sPHENIX is going to perform high statistics measurements extending the kinematic reach at RHIC to overlap the LHC’s. This overlap is going to facilitate a better understanding of the role of temperature, density and parton virtuality in QGP dynamics and, specifically, jet quenching. This paper focuses on key future measurements and the current state of the sPHENIX project. (paper)

  18. Proceedings of RIKEN BNL Research Center workwhop on RHIC spin

    Energy Technology Data Exchange (ETDEWEB)

    SOFFER,J.

    1999-10-06

    This RHIC Spin Workshop is the 1999 annual meeting of the RHIC Spin Collaboration, and the second to be hosted at Brookhaven and sponsored by the RIKEN BNL Research Center. The previous meetings were at Brookhaven (1998), Marseille (1996), MIT in 1995, Argonne 1994, Tucson in 1991, and the Polarized Collider Workshop at Penn State in 1990. As noted last year, the Center provides a home for combined work on spin by theorists, experimenters, and accelerator physicists. This proceedings, as last year, is a compilation of 1 page summaries and 5 selected transparencies for each speaker. It is designed to be available soon after the workshop is completed. Speakers are welcome to include web or other references for additional material. The RHIC spin program and RHIC are rapidly becoming reality. RHIC has completed its first commissioning run, as described here by Steve Peggs. The first Siberian Snake for spin has been completed and is being installed in RHIC. A new polarized source from KEK and Triumf with over 1 milliampere of polarized H{sup minus} is being installed, described by Anatoli Zelenski. They have had a successful test of a new polarimeter for RHIC, described by Kazu Kurita and Haixin Huang. Spin commissioning is expected next spring (2000), and the first physics run for spin is anticipated for spring 2001. The purpose of the workshop is to get everyone together about once per year and discuss goals of the spin program, progress, problems, and new ideas. They also have many separate regular forums on spin. There are spin discussion sessions every Tuesday, now organized by Naohito Saito and Werner Vogelsang. The spin discussion schedule and copies of presentations are posted on http://riksg01.rhic.bnl.gov/rsc. Speakers and other spinners are encouraged to come to BNL and to lead a discussion on your favorite idea. They also have regular polarimeter and snake meetings on alternate Thursdays, led by Bill McGahern, the lead engineer for the accelerator spin

  19. Proceedings of RIKEN BNL Research Center workshop on RHIC spin

    International Nuclear Information System (INIS)

    Soffer, J.

    1999-01-01

    This RHIC Spin Workshop is the 1999 annual meeting of the RHIC Spin Collaboration, and the second to be hosted at Brookhaven and sponsored by the RIKEN BNL Research Center. The previous meetings were at Brookhaven (1998), Marseille (1996), MIT in 1995, Argonne 1994, Tucson in 1991, and the Polarized Collider Workshop at Penn State in 1990. As noted last year, the Center provides a home for combined work on spin by theorists, experimenters, and accelerator physicists. This proceedings, as last year, is a compilation of 1 page summaries and 5 selected transparencies for each speaker. It is designed to be available soon after the workshop is completed. Speakers are welcome to include web or other references for additional material. The RHIC spin program and RHIC are rapidly becoming reality. RHIC has completed its first commissioning run, as described here by Steve Peggs. The first Siberian Snake for spin has been completed and is being installed in RHIC. A new polarized source from KEK and Triumf with over 1 milliampere of polarized H minus is being installed, described by Anatoli Zelenski. They have had a successful test of a new polarimeter for RHIC, described by Kazu Kurita and Haixin Huang. Spin commissioning is expected next spring (2000), and the first physics run for spin is anticipated for spring 2001. The purpose of the workshop is to get everyone together about once per year and discuss goals of the spin program, progress, problems, and new ideas. They also have many separate regular forums on spin. There are spin discussion sessions every Tuesday, now organized by Naohito Saito and Werner Vogelsang. The spin discussion schedule and copies of presentations are posted on http://riksg01.rhic.bnl.gov/rsc. Speakers and other spinners are encouraged to come to BNL and to lead a discussion on your favorite idea. They also have regular polarimeter and snake meetings on alternate Thursdays, led by Bill McGahern, the lead engineer for the accelerator spin effort

  20. Proceedings of RIKEN BNL Research Center Workshop: Brookhaven Summer Program on Nucleon Spin Physics

    Energy Technology Data Exchange (ETDEWEB)

    Aschenauer, A.; Qiu, Jianwei; Vogelsang, W.; Yuan, F.

    2011-08-02

    Understanding the structure of the nucleon is of fundamental importance in sub-atomic physics. Already the experimental studies on the electro-magnetic form factors in the 1950s showed that the nucleon has a nontrivial internal structure, and the deep inelastic scattering experiments in the 1970s revealed the partonic substructure of the nucleon. Modern research focuses in particular on the spin and the gluonic structure of the nucleon. Experiments using deep inelastic scattering or polarized p-p collisions are carried out in the US at the CEBAF and RHIC facilities, respectively, and there are other experimental facilities around the world. More than twenty years ago, the European Muon Collaboration published their first experimental results on the proton spin structure as revealed in polarized deep inelastic lepton-nucleon scattering, and concluded that quarks contribute very little to the proton's spin. With additional experimental and theoretical investigations and progress in the following years, it is now established that, contrary to naive quark model expectations, quarks and anti-quarks carry only about 30% of the total spin of the proton. Twenty years later, the discovery from the polarized hadron collider at RHIC was equally surprising. For the phase space probed by existing RHIC experiments, gluons do not seem to contribute any to the proton's spin. To find out what carries the remaining part of proton's spin is a key focus in current hadronic physics and also a major driving force for the new generation of spin experiments at RHIC and Jefferson Lab and at a future Electron Ion Collider. It is therefore very important and timely to organize a series of annual spin physics meetings to summarize the status of proton spin physics, to focus the effort, and to layout the future perspectives. This summer program on 'Nucleon Spin Physics' held at Brookhaven National Laboratory (BNL) on July 14-27, 2010 [http://www.bnl.gov/spnsp/] is the

  1. University-level Non-proliferation and Safeguards Education and Human Capital Development Activities at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Bachner K. M.; Pepper, S.; Gomera, J.; Einwechter, M.; Toler, L. T.

    2016-07-24

    BNL has offered Nuclear Nonproliferation, Safeguards and Security in the 21st Century,? referred to as NNSS, every year since 2009 for graduate students in technical and policy fields related to nuclear safeguards and nonproliferation. The course focuses on relevant policy issues, in addition to technical components, and is part of a larger NGSI short course initiative that includes separate courses that are delivered at three other national laboratories and NNSA headquarters. [SCHOLZ and ROSENTHAL] The course includes lectures from esteemed nonproliferation experts, tours of various BNL facilities and laboratories, and in-field and table-top exercises on both technical and policy subjects. Topics include the history of the Treaty on the Non-proliferation of Nuclear Weapons (NPT) and other relevant treaties, the history of and advances in international nuclear safeguards, current relevant political situations in countries such as Iran, Iraq, and the Democratic Peoples? Republic of Korea (DPRK), nuclear science and technology, instrumentation and techniques used for verification activities, and associated research and development. The students conduct a mock Design Information Verification (DIV) at BNL?s decommissioned Medical Research Reactor. The capstone of the course includes a series of student presentations in which students act as policy advisors and provide recommendations in response to scenarios involving a current nonproliferation related event that are prepared by the course organizers. ?The course is open to domestic and foreign students, and caters to students in, entering, or recently having completed graduate school. Interested students must complete an application and provide a resume and a statement describing their interest in the course. Eighteen to 22 students attend annually; 165 students have completed the course to date. A stipend helps to defray students? travel and subsistence expenses. In 2015, the course was shortened from three weeks to

  2. New Brookhaven chief seeks cross-cutting research

    CERN Multimedia

    Jones, D

    2003-01-01

    Brookhaven National Laboratory will pursue opportunities for promoting commercial development of energy systems and other technologies while focusing on the lab's primary mission of basic science research, according to the incoming BNL director, Praveen Chaudhari (1 page).

  3. PROCEEDINGS OF RIKEN BNL RESEARCH CENTER WORKSHOP, VOLUME 65, RHIC SPIN COLLABORATION MEETINGS XXVII, XXVIII, and XXX

    International Nuclear Information System (INIS)

    OGAWA, A.

    2004-01-01

    The RIKEN BNL Research Center (RSRC) was established in April 1997 at Brookhaven National Laboratory. It is funded by the 'Rikagaku Kenkyusho' (RIKEN, The Institute of Physical and Chemical Research) of Japan. The Center is dedicated to the study of strong interactions, including spin physics, lattice QCD, and RHIC physics through the nurturing of a new generation of young physicists. The RBRC has both a theory and experimental component. At present the theoretical group has 4 Fellows and 3 Research Associates as well as 11 RHIC Physics/University Fellows (academic year 2003-2004). To date there are approximately 30 graduates from the program of which 13 have attained tenure positions at major institutions worldwide. The experimental group is smaller and has 2 Fellows and 3 RHIC Physics/University Fellows and 3 Research Associates, and historically 6 individuals have attained permanent positions. Beginning in 2001 a new RIKEN Spin Program (RSP) category was implemented at RBRC. These appointments are joint positions of RBRC and RIKEN and include the following positions in theory and experiment: RSP Researchers, RSP Research Associates, and Young Researchers, who are mentored by senior RBRC Scientists, A number of RIKEN Jr. Research Associates and Visiting Scientists also contribute to the physics program at the Center. RBRC has an active workshop program on strong interaction physics with each workshop focused on a specific physics problem. Each workshop speaker is encouraged to select a few of the most important transparencies from his or her presentation, accompanied by a page of explanation. This material is collected at the end of the workshop by the organizer to form proceedings, which can therefore be available within a short time. To date there are sixty nine proceedings volumes available. The construction of a 0.6 teraflops parallel processor, dedicated to lattice QCD, begun at the Center on February 19, 1998, was completed on August 28, 1998 and is still

  4. PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 3 TRENCH 5, BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    International Nuclear Information System (INIS)

    Weaver, P.C.

    2010-01-01

    The Oak Ridge Institute for Science and Education (ORISE) has reviewed the project documentation and data for the High Flux Beam Reactor (HFBR) Underground Utilities removal Phase 3; Trench 5 at Brookhaven National Laboratory (BNL) in Upton, New York. The Brookhaven Survey Group (BSG) has completed removal and performed Final Status Survey (FSS) of the concrete duct from Trench 5 from Building 801 to the Stack. Sample results have been submitted as required to demonstrate that the cleanup goal of (le)15 mrem/yr above background to a resident in 50 years has been met. Four rounds of sampling, from pre-excavation to FSS, were performed as specified in the Field Sampling Plan (FSP) (BNL 2010a). It is the policy of the U.S. Department of Energy (DOE) to perform independent verifications of decontamination and decommissioning activities conducted at DOE facilities. ORISE has been designated as the organization responsible for this task for the HFBR Underground Utilities. ORISE, together with DOE, determined that a Type A verification of Trench 5 was appropriate based on recent verification results from Trenches 2, 3, and 4, and the minimal potential for residual radioactivity in the area. The removal of underground utilities is being performed in three stages to decommission the HFBR facility and support structures. Phase 3 of this project included the removal of at least 200 feet of 36-inch to 42-inch pipe from the west side to the south side of Building 801, and the 14-inch diameter Acid Waste Line that spanned from 801 to the Stack within Trench 5. Based on the pre-excavation sample results of the soil overburden the potential for contamination of the soil surrounding the pipe is minimal (BNL 2010a). ORISE reviewed the BNL FSP and identified comments for consideration (ORISE 2010). BNL prepared a revised FSP that resolved each ORISE comment adequately (BNL 2010a). ORISE referred to the revised HFBR Underground Utilities FSP FSS data to conduct the Type A verification

  5. Report of the Panel on Neutron Data Compilation. Brookhaven National Laboratory, USA, 10-14 February 1969

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1969-05-15

    After surveying current world needs for bibliographic and compilation activities in the field of neutron data, the report of this Panel of 31 individual technical experts, considers the immediate and future role of the world's neutron data centres in this task. In Chapter V the Panel's findings are summarized in the form of recommendations directed to the centres and their associated national and international advisory committees together with all users of the centres. The Panel's recommendations can be summarised as follows: a) The need for bibliographic indexing and numerical compilation of neutron data on an international basis has been clearly demonstrated and should continue for the foreseeable future; b) The operation of CINDA has been extremely satisfactory; c) Neutron data should be compiled at all energies by all centres subject to any mutually agreed exceptions and priorities; d) A fine-meshed classification scheme for neutron reactions should be formulated and put into use before the end of 1969 in accordance with the timetable; e) A scheme for associating a detailed statement of the main characteristics of each experiment with compilations of the resulting data should be formulated and put into preliminary operation before the end of 1969; f) The immediate primary tasks of the principal data centres are to complete the compilation of existing numerical data, whilst keeping abreast of new data, and to agree and implement an improved compilation, storage and retrieval system; g) Input of experimental data can be facilitated by specific measures; h) Centres should publish review publications which they believe will serve the user community; i) The centres should provide data to users in a variety of media: printed listings, graphs, paper tape, punched cards and magnetic tape - but should encourage standardization within each medium so as to free effort to meet special requirements of users having limited computer facilities; j) Centres should hold and

  6. Report of the Panel on Neutron Data Compilation. Brookhaven National Laboratory, USA, 10-14 February 1969

    International Nuclear Information System (INIS)

    1969-05-01

    After surveying current world needs for bibliographic and compilation activities in the field of neutron data, the report of this Panel of 31 individual technical experts, considers the immediate and future role of the world's neutron data centres in this task. In Chapter V the Panel's findings are summarized in the form of recommendations directed to the centres and their associated national and international advisory committees together with all users of the centres. The Panel's recommendations can be summarised as follows: a) The need for bibliographic indexing and numerical compilation of neutron data on an international basis has been clearly demonstrated and should continue for the foreseeable future; b) The operation of CINDA has been extremely satisfactory; c) Neutron data should be compiled at all energies by all centres subject to any mutually agreed exceptions and priorities; d) A fine-meshed classification scheme for neutron reactions should be formulated and put into use before the end of 1969 in accordance with the timetable; e) A scheme for associating a detailed statement of the main characteristics of each experiment with compilations of the resulting data should be formulated and put into preliminary operation before the end of 1969; f) The immediate primary tasks of the principal data centres are to complete the compilation of existing numerical data, whilst keeping abreast of new data, and to agree and implement an improved compilation, storage and retrieval system; g) Input of experimental data can be facilitated by specific measures; h) Centres should publish review publications which they believe will serve the user community; i) The centres should provide data to users in a variety of media: printed listings, graphs, paper tape, punched cards and magnetic tape - but should encourage standardization within each medium so as to free effort to meet special requirements of users having limited computer facilities; j) Centres should hold and

  7. Boron neutron capture therapy (BNCT) for glioblastoma multiforme (GBM), using the epithermal neutron beam at the Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Chadha, Manjeet; Capala, Jacek; Coderre, Jeffrey A.; Elowitz, Eric H.; Joel, Darrel D.; Hungyuan, B. Liu; Slatkin, Daniel N.; Chanana, Arjun D.

    1996-01-01

    Objective: BNCT is a binary treatment modality based on the nuclear reactions that occur when boron ( 10 B) is exposed to thermal neutrons. Preclinical studies have demonstrated the therapeutic efficacy of p-boronophenylalanine (BPA)-based BNCT. The objective of the Phase I/II trial was to evaluate BPA-fructose (BPA-F) as a boron delivery agent for GBM and to study the feasibility and safety of a single-fraction of BNCT. Materials and Methods: The trial design required i) a BPA-F biodistribution study performed at the time of craniotomy; and ii) BNCT within 4 weeks of the craniotomy. From September 94 to July 95, 10 patients with biopsy proven GBM were treated. All but 1 patient underwent a biodistribution study receiving IV BPA-F at the time of craniotomy. Multiple tissue samples and concurrent blood and urine samples were collected for evaluation of the boron concentration and clearance kinetics. For BNCT all patients received 250 mg/kgm of BPA-F (IV infusion over 2 hrs) followed by neutron irradiation. The blood 10 B concentration during irradiation was used to calculate the time of neutron exposure. The 3D treatment planning was done using the BNCT treatment planning software developed at the Idaho National Engineering Laboratory. The BNCT dose is expressed as the sum of the physical dose components corrected for both the RBE and the 10 B localization factor with the unit Gy-Eq. The photon-equivalent dose, where the thermal neutron fluence reaches a maximum, is the peak-dose equivalent. A single-fraction of BNCT was delivered prescribing 10.5 Gy-Eq (9 patients) and 13.8 Gy-Eq (1 patient) as the peak dose-equivalent to the normal brain. The peak dose rate was kept below 27 cGy-Eq/min. Results: Biodistribution data: The maximum blood 10 B concentration was observed at the end of the infusion and scaled as a linear function of the administered dose. The 10 B concentration in the scalp and in the GBM tissue was higher than in blood by 1.5 x and at least 3.5 x

  8. Charmonium production in proton-proton collisions and in collisions of lead nuclei at CERN and comparison with Brookhaven data

    International Nuclear Information System (INIS)

    Topilskaya, N. S.

    2013-01-01

    A review of experimental data on charmoniumproduction that were obtained in fixed-target experiments at the SPS synchrotron and in proton-proton collisions and in collisions of lead nuclei in beams of the Large Hadron Collider (LHC) at CERN (Switzerland) is presented. A comparison with data obtained at the Brookhaven National Laboratory (USA) from experiments at the Relativistic Heavy Ion Collider (RHIC) is performed. Measurement of the suppression of J/ψ-meson production as a possible signal of the production of quark-gluon plasmawas proposed back in 1986 by T. Matsui and H. Satz. An anomalous suppression of J/ψ-meson production was discovered by the NA50 Collaboration at SPS (CERN) in central collisions of lead nuclei at the c.m. collision energy of 158 GeV per nucleon. Data obtained at the c.m. energy of 200 GeV per nucleon in the PHENIX experiment at RHIC indicate that, depending on multiplicity, the suppression of J/ψ-meson production at this energy approximately corresponds to the suppression of J/ψ-meson production in collisions of lead nuclei at the SPS accelerator. Theoretical models that take into account the regeneration of J/ψ mesons describe better RHIC experimental data. The measurement of charmonium production in proton-proton collisions and in collisions of lead nuclei in LHC beams revealed the importance of taking into account the regeneration process. At the LHC energies, it is also necessary to take into account the contribution of B-meson decays. Future measurements of charmonium production at the LHC to a higher statistical precision and over an extended energy region would be of importance for obtaining deeper insight into the mechanism of charmonium production and for studying the properties of matter at high energy density and temperature

  9. RHIC Data Correlation Methodology

    International Nuclear Information System (INIS)

    Michnoff, R.; D'Ottavio, T.; Hoff, L.; MacKay, W.; Satogata, T.

    1999-01-01

    A requirement for RHIC data plotting software and physics analysis is the correlation of data from all accelerator data gathering systems. Data correlation provides the capability for a user to request a plot of multiple data channels vs. time, and to make meaningful time-correlated data comparisons. The task of data correlation for RHIC requires careful consideration because data acquisition triggers are generated from various asynchronous sources including events from the RHIC Event Link, events from the two Beam Sync Links, and other unrelated clocks. In order to correlate data from asynchronous acquisition systems a common time reference is required. The RHIC data correlation methodology will allow all RHIC data to be converted to a common wall clock time, while still preserving native acquisition trigger information. A data correlation task force team, composed of the authors of this paper, has been formed to develop data correlation design details and provide guidelines for software developers. The overall data correlation methodology will be presented in this paper

  10. RHIC FY15 pp Run RHIC and AGS polarization analysis

    Energy Technology Data Exchange (ETDEWEB)

    Huang, H. [Brookhaven National Lab. (BNL), Upton, NY (United States); Adams, P. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2016-02-20

    The polarization information is important for the spin physics program in Relativistic Heavy Ion Collider (RHIC). There are discrepancies between AGS and RHIC polarization measurements. First, the face value of AGS polarization is higher than RHIC ones in general. Second, the measured polarization profile (described by the profile ratio R) is stronger in AGS than in RHIC. This note analyzes the polarization data from FY15 pp run period. The results show that the differences between AGS and RHIC polarization measurements are reasonable, but the R value difference is puzzling. The difference between blue and yellow ring is worth of spin simulation to explain.

  11. RHIC STATUS AND PLANS.

    Energy Technology Data Exchange (ETDEWEB)

    PILAT,R.

    2002-06-02

    RHIC ended successfully its second year of operation in January 2002 after a six month run with gold ions and two months of polarized proton collisions. I will review the machine performance and accomplishments, that include reaching design energy (100 GeV/u) and design luminosity during the gold run, and the first high energy (100 GeV) polarized proton collisions. I will also discuss the machine development strategy and the main performance milestones. The goals and plans for the shutdown and the nest run, scheduled to start in November 2002 have been the focus of a RHIC Retreat in March 2002. I will summarize findings and plans for the upcoming run and outline a vision for the nest few years of RHIC operation and upgrades.

  12. The Amtex DAMA Project: The Brookhaven contribution

    Energy Technology Data Exchange (ETDEWEB)

    Peskin, A.M.

    1995-01-01

    The Amtex Partnership organized in 1993 as a Technology Transfer Collaboration among members of the integrated textile industry, the DOE National Laboratories, a number of universities, and several research/education/technology transfer organizations (RETTs). Under the Amtex umbrella organization, a number of technology areas were defined and individual projects were launched addressing various aspects of improving the health and competitiveness of the American textile industry. The first and, to date, the largest of these has been the computer-based Demand Activated Manufacturing Architecture (DAMA) project. Brookhaven National Laboratory became involved in DAMA beginning in March of 1993 and remained an active participant through January of 1995. It was staffed almost exclusively with personnel of the Computing and Communications Division. This document summarizes the activities and accomplishments of the Brookhaven team in working with the larger collaboration. Detailed information about the Amtex Partnership, the DAMA Project, and specific BNL contributions are documented elsewhere.

  13. RHIC prefire protection masks

    International Nuclear Information System (INIS)

    Drees, A.; Biscardi, C.; Curcio, T.; Gassner, D.; DeSanto, L.; Fu, W.; Liaw, C. J.; Montag, C.; Thieberger, P.; Yip, K.

    2015-01-01

    The protection of the RHIC experimental detectors from damage due to beam hitting close upstream elements in cases of abort kicker prefires requires some dedicated precautionary measures with two general options: to bring the beam close to a limiting aperture (i.e. the beam pipe wall), as far upstream of the detector components as possible or, alternatively, to bring a limiting aperture close to the circulating beam. Spontaneous and random prefires of abort kicker modules (Pulse Forming Network, PFN) have a history as long as RHIC is being operated. The abort system consist of 5 kickers in per ring, each of them equipped with its own dedicated PFN.

  14. Brookhaven at 40 - looking forward as well as back

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    In 1947, the famous Camp Upton Army Base on New York's Long Island switched to a new career as Brookhaven National Laboratory. The reputation the Laboratory has established as a world-class research centre and its continued attraction for scientists looking for exciting possibilities were highlighted on 9-11 September at a symposium and celebration marking forty years of Brookhaven and its parent organization, AUI (Associated Universities Inc)

  15. BROOKHAVEN: Booster boost

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    After three months of intensive dedicated machine studies, Brookhaven's new Booster accelerated 5 x 10 13 protons over four cycles, about 85% of the design intensity. This was made possible by careful matching of Linac beam into the Booster and by extensive resonance stop band corrections implemented during Booster acceleration. The best single cycle injection into the AGS Alternating Gradient Synchrotron was 1.14 x 10 13 protons from the Booster. 1.05 x 10 13 protons were kept in the AGS, a 92% combined efficiency of extraction, transfer, and injection. The maximum injected 1994 shutdown period, enabling the 1994 physics run to make use of the full Booster intensity and go for the stated AGS objective of 4x10 13 protons per pulse

  16. RHIC SPIN PROGRAM: MACHINE ASPECTS AND RECENT PROGRESS

    International Nuclear Information System (INIS)

    ROSER, T.

    1999-01-01

    High energy polarized beam collisions will open up the unique physics opportunities of studying spin effects in hard processes. However, the acceleration of polarized beams in circular accelerators is complicated by the numerous depolarizing spin resonances. Using a partial Siberian Snake and a rf dipole that ensure stable adiabatic spin motion during acceleration has made it possible to accelerate polarized protons to 25 GeV at the Brookhaven AGS. Full Siberian Snakes and polarimeters are being developed for RHIC to make the acceleration of polarized protons to 250 GeV possible

  17. Brookhaven highlights for fiscal year 1991, October 1, 1990--September 30, 1991

    International Nuclear Information System (INIS)

    Rowe, M.S.; Cohen, A.; Greenberg, D.; Seubert, L.; Kuper, J.B.H.

    1991-01-01

    This report highlights Brookhaven National Laboratory's activities for fiscal year 1991. Topics from the four research divisions: Computing and Communications, Instrumentation, Reactors, and Safety and Environmental Protection are presented. The research programs at Brookhaven are diverse, as is reflected by the nine different scientific departments: Accelerator Development, Alternating Gradient Synchrotron, Applied Science, Biology, Chemistry, Medical, National Synchrotron Light Source, Nuclear Energy, and Physics. Administrative and managerial information about Brookhaven are also disclosed

  18. Brookhaven highlights for fiscal year 1991, October 1, 1990--September 30, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, M.S.; Cohen, A.; Greenberg, D.; Seubert, L.; Kuper, J.B.H.

    1991-01-01

    This report highlights Brookhaven National Laboratory's activities for fiscal year 1991. Topics from the four research divisions: Computing and Communications, Instrumentation, Reactors, and Safety and Environmental Protection are presented. The research programs at Brookhaven are diverse, as is reflected by the nine different scientific departments: Accelerator Development, Alternating Gradient Synchrotron, Applied Science, Biology, Chemistry, Medical, National Synchrotron Light Source, Nuclear Energy, and Physics. Administrative and managerial information about Brookhaven are also disclosed. (GHH)

  19. Brookhaven highlights for fiscal year 1991, October 1, 1990--September 30, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, M.S.; Cohen, A.; Greenberg, D.; Seubert, L.; Kuper, J.B.H.

    1991-12-31

    This report highlights Brookhaven National Laboratory`s activities for fiscal year 1991. Topics from the four research divisions: Computing and Communications, Instrumentation, Reactors, and Safety and Environmental Protection are presented. The research programs at Brookhaven are diverse, as is reflected by the nine different scientific departments: Accelerator Development, Alternating Gradient Synchrotron, Applied Science, Biology, Chemistry, Medical, National Synchrotron Light Source, Nuclear Energy, and Physics. Administrative and managerial information about Brookhaven are also disclosed. (GHH)

  20. THE RHIC SEQUENCER

    International Nuclear Information System (INIS)

    VAN ZEIJTS, J.; DOTTAVIO, T.; FRAK, B.; MICHNOFF, R.

    2001-01-01

    The Relativistic Heavy Ion Collider (RHIC) has a high level asynchronous time-line driven by a controlling program called the ''Sequencer''. Most high-level magnet and beam related issues are orchestrated by this system. The system also plays an important task in coordinated data acquisition and saving. We present the program, operator interface, operational impact and experience

  1. RHIC injection kicker impedance

    International Nuclear Information System (INIS)

    Mane, V.; Peggs, S.; Trbojevic, D.; Zhang, W.

    1995-01-01

    The longitudinal impedance of the RHIC injection kicker is measured using the wire method up to a frequency of 3 GHz. The mismatch between the 50 ohm cable and the wire and pipe system is calibrated using the TRL calibration algorithm. Various methods of reducing the impedance, such as coated ceramic pipe and copper strips are investigated

  2. PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 3 TRENCH 1, BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    International Nuclear Information System (INIS)

    Harpenau, E.M.

    2010-01-01

    The Oak Ridge Institute for Science and Education (ORISE) has reviewed the project documentation and data for the High Flux Beam Reactor (HFBR) Underground Utilities removal Phase 3; Trench 1 at Brookhaven National Laboratory (BNL) in Upton, New York. The Brookhaven Survey Group (BSG) has completed removal and performed Final Status Survey (FSS) of the 42-inch duct and 14-inch line in Trench 1 from Building 801 to the Stack. Sample results have been submitted as required to demonstrate that the cleanup goal of (le)15 mrem/yr above background to a resident in 50 years has been met. Four rounds of sampling, from pre-excavation to FSS, were performed as specified in the Field Sampling Plan (FSP) (BNL 2010a). It is the policy of the U.S. Department of Energy (DOE) to perform independent verifications of decontamination and decommissioning activities conducted at DOE facilities. ORISE has been designated as the organization responsible for this task for the HFBR Underground Utilities. ORISE, together with DOE, determined that a Type A verification of Trench 1 was appropriate based on recent verification results from Trenches 2, 3, 4, and 5, and the minimal potential for residual radioactivity in the area. The removal of underground utilities has been performed in three stages to decommission the HFBR facility and support structures. Phase 3 of this project included the removal of at least 200 feet of 36-inch to 42-inch duct from the west side to the south side of Building 801, and the 14-inch diameter Acid Waste Line that spanned from 801 to the Stack within Trench 1. Based on the pre-excavation sample results of the soil overburden, the potential for contamination of the soil surrounding the pipe is minimal (BNL 2010a). ORISE reviewed the gamma spectroscopy results for 14 FSS soil samples, four core samples, and one duplicate sample collected from Trench 1. Sample results for the radionuclides of concern were below the established cleanup goals. However, in sample PH-3

  3. BROOKHAVEN: Glueballs, hybrids and exotics

    Energy Technology Data Exchange (ETDEWEB)

    Chung, S. -U.

    1988-12-15

    A workshop at Brookhaven from August 29 to September 1 looked at the current status of hadron spectroscopy beyond the realm of states conventionally built up from quarks and discussed future experimental effort to explore such exotic states.

  4. Polarized Proton Collisions at RHIC

    CERN Document Server

    Bai, Mei; Alekseev, Igor G; Alessi, James; Beebe-Wang, Joanne; Blaskiewicz, Michael; Bravar, Alessandro; Brennan, Joseph M; Bruno, Donald; Bunce, Gerry; Butler, John J; Cameron, Peter; Connolly, Roger; De Long, Joseph; Drees, Angelika; Fischer, Wolfram; Ganetis, George; Gardner, Chris J; Glenn, Joseph; Hayes, Thomas; Hseuh Hsiao Chaun; Huang, Haixin; Ingrassia, Peter; Iriso, Ubaldo; Laster, Jonathan S; Lee, Roger C; Luccio, Alfredo U; Luo, Yun; MacKay, William W; Makdisi, Yousef; Marr, Gregory J; Marusic, Al; McIntyre, Gary; Michnoff, Robert; Montag, Christoph; Morris, John; Nicoletti, Tony; Oddo, Peter; Oerter, Brian; Osamu, Jinnouchi; Pilat, Fulvia Caterina; Ptitsyn, Vadim; Roser, Thomas; Satogata, Todd; Smith, Kevin T; Svirida, Dima; Tepikian, Steven; Tomas, Rogelio; Trbojevic, Dejan; Tsoupas, Nicholaos; Tuozzolo, Joseph; Vetter, Kurt; Wilinski, Michelle; Zaltsman, Alex; Zelenski, Anatoli; Zeno, Keith; Zhang, S Y

    2005-01-01

    The Relativistic Heavy Ion Collider~(RHIC) provides not only collisions of ions but also collisions of polarized protons. In a circular accelerator, the polarization of polarized proton beam can be partially or fully lost when a spin depolarizing resonance is encountered. To preserve the beam polarization during acceleration, two full Siberian snakes were employed in RHIC to avoid depolarizing resonances. In 2003, polarized proton beams were accelerated to 100~GeV and collided in RHIC. Beams were brought into collisions with longitudinal polarization at the experiments STAR and PHENIX by using spin rotators. RHIC polarized proton run experience demonstrates that optimizing polarization transmission efficiency and improving luminosity performance are significant challenges. Currently, the luminosity lifetime in RHIC is limited by the beam-beam effect. The current state of RHIC polarized proton program, including its dedicated physics run in 2005 and efforts to optimize luminosity production in beam-beam limite...

  5. The Brookhaven Radiation Effects Facility

    Energy Technology Data Exchange (ETDEWEB)

    Grand, P.; Snead, C.L.; Ward, T.

    1988-01-01

    The Neutral Particle Beam (NPB) Radiation Effects Facility (REF), funded by the Strategic Defense Initiative Office (SDIO) through the Defense Nuclear Agency (DNA) and the Air Force Weapons Laboratory (AFWL), has been constructed at Brookhaven National Laboratory (BNL). Operation started in October 1986. The facility is capable of delivering pulsed H{sup -}, H{sup o}, and H{sup +} beams of 100 to 200 MeV energy up to 30 mA peak current. Pulses can be adjusted from 5 {mu}s to 500 {mu}s length at a repetition rate of 5 pps. The beam spot on target is adjustable from 3 to 100 cm diameter (2 {sigma}) resulting in a maximum dose of about 10 MRads (Si) per pulse (small beam spot). Experimental use of the REF is being primarily supported by the SDI lethality (LTH-4) program. The program has addressed ionization effects in electronics, both dose rate and total dose dependence, radiation-sensitive components, and dE/dx effects in energetic materials including propellants and high explosives (HE). This paper describes the facility, its capabilities and potential, and the experiments that have been carried out to date or are being planned. 2 refs., 10 figs.

  6. The Brookhaven Radiation Effects Facility

    International Nuclear Information System (INIS)

    Grand, P.; Snead, C.L.; Ward, T.

    1988-01-01

    The Neutral Particle Beam (NPB) Radiation Effects Facility (REF), funded by the Strategic Defense Initiative Office (SDIO) through the Defense Nuclear Agency (DNA) and the Air Force Weapons Laboratory (AFWL), has been constructed at Brookhaven National Laboratory (BNL). Operation started in October 1986. The facility is capable of delivering pulsed H - , H/sup o/, and H + beams of 100 to 200 MeV energy up to 30 mA peak current. Pulses can be adjusted from 5 μs to 500 μs length at a repetition rate of 5 pps. The beam spot on target is adjustable from 3 to 100 cm diameter (2 σ) resulting in a maximum dose of about 10 MRads (Si) per pulse (small beam spot). Experimental use of the REF is being primarily supported by the SDI lethality (LTH-4) program. The program has addressed ionization effects in electronics, both dose rate and total dose dependence, radiation-sensitive components, and dE/dx effects in energetic materials including propellants and high explosives (HE). This paper describes the facility, its capabilities and potential, and the experiments that have been carried out to date or are being planned. 2 refs., 10 figs

  7. ATLAS Overview Week at Brookhaven

    CERN Multimedia

    Pilcher, J

    Over 200 ATLAS participants gathered at Brookhaven National Laboratory during the first week of June for our annual overview week. Some system communities arrived early and held meetings on Saturday and Sunday, and the detector interface group (DIG) and Technical Coordination also took advantage of the time to discuss issues of interest for all detector systems. Sunday was also marked by a workshop on the possibilities for heavy ion physics with ATLAS. Beginning on Monday, and for the rest of the week, sessions were held in common in the well equipped Berkner Hall auditorium complex. Laptop computers became the norm for presentations and a wireless network kept laptop owners well connected. Most lunches and dinners were held on the lawn outside Berkner Hall. The weather was very cooperative and it was an extremely pleasant setting. This picture shows most of the participants from a view on the roof of Berkner Hall. Technical Coordination and Integration issues started the reports on Monday and became a...

  8. QCD and RHIC

    International Nuclear Information System (INIS)

    Kharzeev, D.

    2004-01-01

    In this talk I discuss recent advances in Quantum Chromo-Dynamics, in particular the progress in understanding the collective dynamics of the theory. I emphasise the significance of the RHIC program for establishing the properties of hot and dense QCD matter and for understanding the dynamics of the theory at the high parton density, strong color field frontier. Hopes and expectations for the future are discussed as well

  9. The RHIC status update

    International Nuclear Information System (INIS)

    Ozaki, S.

    1995-01-01

    The construction of the Relativistic Heavy Ion Collider (RHIC) began in 1991, with the completion date originally scheduled for 1997. Significant reduction of the funding levels in FY 1993 and 1994, and the funding level cap for FY 1995 and later years caused a 19-month stretchout of the construction period to the second quarter of FY 1999, and an increase of the total estimated cost (TEC) to $475 M. The Project, therefore, is now at the halfway mark of the construction period with actual cost and schedule performance tracking close to the DOE-approved baseline. Construction funding through FY 1994 reached close to 60% of the TEC. Incidentally, if one adds the current value of preexisting facilities which will be incorporated into RHIC, such as the injection system (Tandem Van de Graaff - the Booster - the AGS), the esixting 3.8 km tunnel, the 24 kW helium refrigerator, etc., the total value of the RHIC facility, when completed, will reach one billion dollars, if not more. The accelerator lattice design was finalized in 1992 after an intensive study was made to optimize the collider design for performance, operational flexibility, and value engineering. The civil construciton, including the collider enclosure, magnet access ports to the ring tunnel, and six service buildings for accelerator power supplies and cryogenic control boxes was completed

  10. [Pion interferometry search for a phase change in hadronic matter in relativistic heavy ion collisions and its application to RHIC: Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Cherney, M.

    1992-05-01

    The purpose of this research is to assist in the investigation of the behavior of hadronic matter under extreme conditions. Specifically, this project intends to actively involve Creighton students and faculty in the search for indications of a phase transition from hadronic to quark matter. It is believed that the conditions necessary for the formation of this quark-gluon plasma include large energy densities over extended volumes. The technique of boson interferometry may prove to be the effective tool in verifying the existence of a quark-gluon plasma. This project continues active collaboration with Department of Energy research centers working on the NA36, NA44, and STAR experiments. It involves the effective development of the hardware, software and analytical skills required for a large relativistic heavy ion facility at Brookhaven National Laboratory (RHIC). Integral to this endeavor are educational opportunities for students at Creighton University.

  11. (Pion interferometry search for a phase change in hadronic matter in relativistic heavy ion collisions and its application to RHIC: Progress report)

    Energy Technology Data Exchange (ETDEWEB)

    Cherney, M.

    1992-01-01

    The purpose of this research is to assist in the investigation of the behavior of hadronic matter under extreme conditions. Specifically, this project intends to actively involve Creighton students and faculty in the search for indications of a phase transition from hadronic to quark matter. It is believed that the conditions necessary for the formation of this quark-gluon plasma include large energy densities over extended volumes. The technique of boson interferometry may prove to be the effective tool in verifying the existence of a quark-gluon plasma. This project continues active collaboration with Department of Energy research centers working on the NA36, NA44, and STAR experiments. It involves the effective development of the hardware, software and analytical skills required for a large relativistic heavy ion facility at Brookhaven National Laboratory (RHIC). Integral to this endeavor are educational opportunities for students at Creighton University.

  12. [Pion interferometry search for a phase change in hadronic matter in relativistic heavy ion collisions and its application to RHIC: Progress report

    International Nuclear Information System (INIS)

    Cherney, M.

    1992-01-01

    The purpose of this research is to assist in the investigation of the behavior of hadronic matter under extreme conditions. Specifically, this project intends to actively involve Creighton students and faculty in the search for indications of a phase transition from hadronic to quark matter. It is believed that the conditions necessary for the formation of this quark-gluon plasma include large energy densities over extended volumes. The technique of boson interferometry may prove to be the effective tool in verifying the existence of a quark-gluon plasma. This project continues active collaboration with Department of Energy research centers working on the NA36, NA44, and STAR experiments. It involves the effective development of the hardware, software and analytical skills required for a large relativistic heavy ion facility at Brookhaven National Laboratory (RHIC). Integral to this endeavor are educational opportunities for students at Creighton University

  13. AGS-2000: Experiments for the 21. Century. Proceedings of the workshop held at Brookhaven National Laboratory, May 13--17, 1996

    International Nuclear Information System (INIS)

    Littenberg, L.; Sandweiss, J.

    1996-01-01

    The AGS has a vital and interesting potential for new research. The reasons for this are a fortunate concomitance of the energy chosen for the AGS and the steady stream of technological advances which have both increased the intensity and flexibility of the AGS beams, and the capability of detectors to use these new beam parameters. The physics potentials of the future AGS program can be roughly divided into three broad areas. (1) fundamental elementary particle studies (based on rare kaon decays, rare muon processes and searches for new particles); (2) non-perturbative QCD; and (3) heavy ion physics. The overriding considerations for the operation of the AGS in the next decade must, of course, be the interest and potential of the scientific program. However, once that has been established, there are other aspects of the AGS program which deserve mention. Although experiments at the AGS are of increasing sophistication, they are smaller, less expensive, and more quickly executed than experiments at newer, larger facilities. Finally, the authors note that since the AGS must be maintained as a viable accelerator to serve as an injector to RHIC, the cost of an AGS fixed target experiment need be only the incremental cost of the experiment itself along with some modest additional operating costs. This means that AGS fixed target experiments are substantially cheaper than they would have been before the RHIC era. The remainder of this document contains brief summaries of the experiments considered by the working groups in the AGS-2000 Workshop. These summaries expand on points discussed here

  14. Charged particle multiplicity distributions in Au-Au collisions at RHIC-BNL energies (BRAHMS Experiment)

    International Nuclear Information System (INIS)

    Argintaru, D.; Bearden, I.G.; Beavis, D.

    2002-01-01

    The BRAHMS Experiment (Broad RAnge Hadronic Magnetic Spectrometers) takes place at the Relativistic Heavy Ion Collider (RHIC) from Brookhaven National Laboratory and searches for a transition of matter into a new phase called quark-gluon plasma (QGP), a phase transition that appears in extreme conditions of nuclear matter densities and temperatures. Important signals for this transition are related to dependencies of the charged particle multiplicity distributions on the pseudorapidity range. The charged particle multiplicity distributions in Au-Au collisions at RHIC energies are obtained from the global detector measurements. These detectors are: - An array of Si strip detectors and scintillation tiles placed around the interaction region; they cover the range η < 2 in pseudorapidity, measuring the majority of charged particles; - Two systems of Cerenkov detectors (Beam-Beam Counters) placed both sides of the nominal interaction point at 220 cm and cover the range 3 < η < 4.3 in pseudorapidity. These detectors are used for vertex determination and supply a level zero trigger for the entire experiment; - Zero Degree Calorimeters placed at zero degree with respect to the beam axis, both sides of the vertex, measuring the spectator neutrons from the nuclear reactions. These detectors supplies information about the reaction centrality and could estimate the interaction vertex. The paper presents some results on charged particle multiplicities in different pseudorapidity ranges at different impact parameters. Interesting dependencies of the average charged particle multiplicities on the pseudorapidity range, impact parameters and total available energy in the centre of mass system. Some comparisons with the simulation codes predictions and theoretical model estimations are included, too. (authors)

  15. Brookhaven Lab and Argonne Lab scientists invent a plasma valve

    CERN Multimedia

    2003-01-01

    Scientists from Brookhaven National Laboratory and Argonne National Laboratory have received U.S. patent number 6,528,948 for a device that shuts off airflow into a vacuum about one million times faster than mechanical valves or shutters that are currently in use (1 page).

  16. LETTER REPORT - INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    International Nuclear Information System (INIS)

    Weaver, P.C.

    2010-01-01

    Oak Ridge Institute for Science and Education (ORISE) personnel visited the Brookhaven National Laboratory (BNL) on August 17 through August 23, 2010 to perform visual inspections and conduct independent measurement and sampling of the 'Outside Areas' at the High Flux Beam Reactor (HFBR) decommissioning project. During this visit, ORISE was also able to evaluate Fan House, Building 704 survey units (SUs) 4 and 5, which are part of the Underground Utilities portion of the HFBR decommissioning project. ORISE performed limited alpha plus beta scans of the remaining Fan House foundation lower walls and remaining pedestals while collecting static measurements. Scans were performed using gas proportional detectors coupled to ratemeter-scalers with audible output and encompassed an area of approximately 1 square meter around the static measurement location. Alpha plus beta scans ranged from 120 to 460 cpm. Twenty smears for gross alpha and beta activity and tritium were collected at judgmentally selected locations on the walls and pedestals of the Fan House foundation. Attention was given to joints, cracks, and penetrations when determining each sample location. Removable concentrations ranged from -0.43 to 1.73 dpm/100 cm2 for alpha and -3.64 to 7.80 dpm/100 cm2 for beta. Tritium results for smears ranged from -1.9 to 9.0 pCi/g. On the concrete pad, 100% of accessible area was scanned using a large area alpha plus beta gas proportional detector coupled to a ratemeter-scaler. Gross scan count rates ranged from 800 to 1500 cpm using the large area detector. Three concrete samples were collected from the pad primarily for tritium analysis. Tritium concentrations in concrete samples ranged from 53.3 to 127.5 pCi/g. Gamma spectroscopy results of radionuclide concentrations in concrete samples ranged from 0.02 to 0.11 pCi/g for Cs-137 and 0.19 to 0.22 pCi/g for Ra-226. High density scans for gamma radiation levels were performed in accessible areas in each SU, Fan House

  17. Fast Automated Decoupling at RHIC

    CERN Document Server

    Beebe-Wang, Joanne

    2005-01-01

    Coupling correction is essential for the operational performance of RHIC. The independence of the transverse degrees of freedom makes diagnostics and tune control easier, and it is advantageous to operate an accelerator close to the coupling resonance to minimize nearby nonlinear sidebands. An automated decoupling application has been developed at RHIC for coupling correction during routine operations. The application decouples RHIC globally by minimizing the tune separation through finding the optimal settings of two orthogonal skew quadrupole families. The program provides options of automatic, semi-automatic and manual decoupling operations. It accesses tune information from all RHIC tune measurement systems: the PLL (Phase Lock Loop), the high frequency Schottky system, and the tune meter. It also supplies tune and skew quadrupole scans, finding the minimum tune separation, display the real time results and interface with the RHIC control system. We summarize the capabilities of the decoupling application...

  18. PROCEEDINGS OF THE 2001 NATIONAL OILHEAT RESEARCH ALLIANCE TECHNOLOGY CONFERENCE HELD AT BROOKHAVEN NATIONAL LABORATORY, UPTON, N.Y., APRIL 30 - MAY 1, 2001.

    Energy Technology Data Exchange (ETDEWEB)

    MCDONALD, R.J.

    2001-04-30

    BNL is proud to acknowledge all of our 2001 sponsors, with their help and support this has correctly become an oilheat industry conference. It is quite gratifying to see an industry come together to help support an activity like the technology conference, for the benefit of the industry as a whole and to celebrate the beginning of the National Oilheat Research Alliance. This meeting is the fourteenth oil heat industry technology conference to be held since 1984 and the first under a new name, NORA, the National Oilheat research Alliance, and the very first in the new century. The conference is a very important part of the effort in technology transfer, which is supported by the Oilheat Research Program. The Oilheat Research Program at BNL is under the newly assigned program management at the Office of Power Technology within the US DOE. The foremost reason for the conference is to provide a platform for the exchange of information and perspectives among international researchers, engineers, manufacturers, service technicians, and marketers of oil-fired space-conditioning equipment. The conference provides a conduit by which information and ideas can be exchanged to examine present technologies, as well as helping to develop the future course for oil heating advancement. These conferences also serve as a stage for unifying government representatives, researchers, fuel oil marketers, and other members of the oil-heat industry in addressing technology advancements in this important energy use sector. The specific objectives of the conference are to: (1) Identify and evaluate the current state-of-the-art and recommend new initiatives for higher efficiency, a cleaner environment, and to satisfy consumer needs cost-effectively, reliably, and safely; (2) Foster cooperative interactions among federal and industrial representatives for the common goal of sustained economic growth and energy security via energy conservation. Seventeen technical presentations will be made

  19. Proceedings of the symposium on RHIC detector R&D

    Energy Technology Data Exchange (ETDEWEB)

    Makdisi, Y.; Stevens, A.J. [eds.

    1991-12-31

    This report contains papers on the following topics: Development of Analog Memories for RHIC Detector Front-end Electronic Systems; Monolithic Circuit Development for RHIC at Oak Ridge National Laboratory; Highly Integrated Electronics for the STAR TPC; Monolithic Readout Circuits for RHIC; New Methods for Trigger Electronics Development; Neurocomputing methods for Pattern Recognition in Nuclear Physics; The Development of a Silicon Multiplicity Detector System; The Vertex Detector for the Lepton/Photon Collaboration; Simulations of Silicon Vertex Tracker for STAR Experiment at RHIC; Calorimeter/Absorber Optimization for a RHIC Dimuon Experiment (RD-10 Project); Applications of the LAHET simulation Code to Relativistic Heavy Ion Detectors; Highly Segmented, High Resolution Time-of-Flight System; Research and Development on a Sub 100 Picosecond Time-of-Flight System Based on Silicon Avalance Diodes; Behavior of TPC`s in a High Particle Flux Environment; Generic R&D on Undoped Cesium Iodide and Lead Fluoride; and A Transition Radiation Detector for RHIC Featuring Accurate Tracking and dE/dx Particle Identification. Selected papers were processed separately for inclusion in the Energy Science and Technology Database.

  20. Ramp Management in RHIC

    International Nuclear Information System (INIS)

    Kewisch, J.; Van Zeijts, J.; Peggs, S.; Satogata, T.

    1999-01-01

    In RHIC, magnets and RF cavities are controlled by Wave Form Generators (WFGs), simple real time computers which generate the set points. The WFGs are programmed to change set points from one state to another in a synchrotronized way. Such transition is called a ''Ramp'' and consists of a sequence of ''stepping stones'' which contain the set point of every WFG controlled device at a point in time. An appropriate interpolation defines the set points between these stepping stones. This report describes the implementation of the ramp system. The user interface, tools to create and modify ramps, interaction with modeling tools and measurements and correction programs are discussed

  1. RHIC electron lenses upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Gu, X. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Altinbas, Z. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Bruno, D. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Binello, S. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Costanzo, M. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Drees, A. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Fischer, W. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Gassner, D. M. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Hock, J. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Hock, K. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Harvey, M. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Luo, Y. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Marusic, A. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Mi, C. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Mernick, K. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Minty, M. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Michnoff, R. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Miller, T. A. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Pikin, A. I. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Robert-Demolaize, G. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Samms, T. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Shrey, T. C. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Schoefer, V. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Tan, Y. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Than, R. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Thieberger, P. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; White, S. M. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.

    2015-05-03

    In the Relativistic Heavy Ion Collider (RHIC) 100 GeV polarized proton run in 2015, two electron lenses were used to partially compensate for the head-on beam-beam effect for the first time. Here, we describe the design of the current electron lens, detailing the hardware modifications made after the 2014 commissioning run with heavy ions. A new electron gun with 15-mm diameter cathode is characterized. The electron beam transverse profile was measured using a YAG screen and fitted with a Gaussian distribution. During operation, the overlap of the electron and proton beams was achieved using the electron backscattering detector in conjunction with an automated orbit control program.

  2. Brookhaven leak reactor to close

    CERN Multimedia

    MacIlwain, C

    1999-01-01

    The DOE has announced that the High Flux Beam Reactor at Brookhaven is to close for good. Though the news was not unexpected researchers were angry the decision had been taken before the review to assess the impact of reopening the reactor had been concluded (1 page).

  3. Brookhaven highlights, October 1978-September 1979

    International Nuclear Information System (INIS)

    1979-01-01

    These highlights present an overview of the major research and development achievements at Brookhaven National Laboratory from October 1978 to September 1979. Specific areas covered include: accelerator and high energy physics programs; high energy physics research; the AGS and improvements to the AGS; neutral beam development; heavy ion fusion; superconducting power cables; ISABELLE storage rings; the BNL Tandem accelerator; heavy ion experiments at the Tandem; the High Flux Beam Reactor; medium energy physics; nuclear theory; atomic and applied physics; solid state physics; neutron scattering studies; x-ray scattering studies; solid state theory; defects and disorder in solids; surface physics; the National Synchrotron Light Source ; Chemistry Department; Biology Department; Medical Department; energy sciences; environmental sciences; energy technology programs; National Center for Analysis of Energy Systems; advanced reactor systems; nuclear safety; National Nuclear Data Center; nuclear materials safeguards; Applied Mathematics Department; and support activities

  4. PROCEEDINGS OF RIKEN BNL RESEARCH CENTER WORKSHOP, VOLUME 72, RHIC SPIN COLLABORATION MEETINGS XXXI, XXXII, XXXIII

    International Nuclear Information System (INIS)

    OGAWA, A.

    2005-01-01

    The RIKEN BNL Research Center (RBRC) was established in April 1997 at Brookhaven National Laboratory. It is funded by the ''Rikagaku Kenkyusho'' (RIKEN, The Institute of Physical and Chemical Research) of Japan. The Center is dedicated to the study of strong interactions, including spin physics, lattice QCD, and RHIC physics through the nurturing of a new generation of young physicists. The RBRC has both a theory and experimental component. At present the theoretical group has 4 Fellows and 3 Research Associates as well as 11 RHIC Physics/University Fellows (academic year 2003-2004). To date there are approximately 30 graduates from the program of which 13 have attained tenure positions at major institutions worldwide. The experimental group is smaller and has 2 Fellows and 3 RHIC Physics/University Fellows and 3 Research Associates, and historically 6 individuals have attained permanent positions. Beginning in 2001 a new RIKEN Spin Program (RSP) category was implemented at RBRC. These appointments are joint positions of RBRC and RIKEN and include the following positions in theory and experiment: RSP Researchers, RSP Research Associates, and Young Researchers, who are mentored by senior RBRC Scientists. A number of RIKEN Jr. Research Associates and Visiting Scientists also contribute to the physics program at the Center. RBRC has an active workshop program on strong interaction physics with each workshop focused on a specific physics problem. Each workshop speaker is encouraged to select a few of the most important transparencies from his or her presentation, accompanied by a page of explanation. This material is collected at the end of the workshop by the organizer to form proceedings, which can therefore be available within a short time. To date there are seventy-two proceeding volumes available. The construction of a 0.6 teraflops parallel processor, dedicated to lattice QCD, begun at the Center on February 19, 1998, was completed on August 28, 1998 and is still

  5. Recombinant Science: The Birth of the Relativistic Heavy Ion Collider (431st Brookhaven Lecture)

    International Nuclear Information System (INIS)

    Crease, Robert P.

    2007-01-01

    As part of the celebration of Brookhaven Lab's 60th anniversary, Robert P. Crease, the Chair of the Philosophy Department at Stony Brook University and BNL's historian, will present the second of two talks on the Lab's history. In 'Recombinant Science: The Birth of the Relativistic Heavy Ion Collider,' Dr. Crease will focus on the creation of the world's most powerful colliding accelerator for nuclear physics. Known as RHIC, the collider, as Dr. Crease will recount, was formally proposed in 1984, received initial construction funding from the U.S. Department of Energy in 1991, and started operating in 2000. In 2005, the discovery at RHIC of the world's most perfect liquid, a state of matter that last existed just moments after the Big Bang, was announced, and, since then, this perfect liquid of quarks and gluons has been the subject of intense study.

  6. How Big Science Came to Long Island: the Birth of Brookhaven Lab (429th Brookhaven Lecture)

    International Nuclear Information System (INIS)

    Crease, Robert P.

    2007-01-01

    Robert P. Crease, historian for the U.S. Department of Energy's Brookhaven National Laboratory and Chair of the Philosophy Department at Stony Brook University, will give two talks on the Laboratory's history on October 31 and December 12. Crease's October 31 talk, titled 'How Big Science Came to Long Island: The Birth of Brookhaven Lab,' will cover the founding of the Laboratory soon after World War II as a peacetime facility to construct and maintain basic research facilities, such as nuclear reactors and particle accelerators, that were too large for single institutions to build and operate. He will discuss the key figures involved in starting the Laboratory, including Nobel laureates I.I. Rabi and Norman Ramsey, as well as Donald Dexter Van Slyke, one of the most renowned medical researchers in American history. Crease also will focus on the many problems that had to be overcome in creating the Laboratory and designing its first big machines, as well as the evolving relations of the Laboratory with the surrounding Long Island community and news media. Throughout his talk, Crease will tell fascinating stories about Brookhaven's scientists and their research.

  7. From heavy ions to light sources at Brookhaven

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    The Brookhaven National Laboratory, recovered from the debacle of the cancelled CBA proton-proton collider project, is now more than busy with an excellent physics programme at the 33 GeV Alternating Gradient Synchrotron and with solid projects for the years to come. (orig.).

  8. ELECTRON COOLING FOR RHIC

    International Nuclear Information System (INIS)

    BEN-ZVI, I.; AHRENS, L.; BRENNAN, M.; HARRISON, M.; KEWISCH, J.; MACKAY, W.; PEGGS, S.; ROSER, T.; SATOGATA, T.; TRBOJEVIC, D.; YAKIMENKO, V.

    2001-01-01

    We introduce plans for electron-cooling of the Relativistic Heavy Ion Collider (RHIC). This project has a number of new features as electron coolers go: It will cool 100 GeV/nucleon ions with 50 MeV electrons; it will be the first attempt to cool a collider at storage-energy; and it will be the first cooler to use a bunched beam and a linear accelerator as the electron source. The linac will be superconducting with energy recovery. The electron source will be based on a photocathode gun. The project is carried out by the Collider-Accelerator Department at BNL in collaboration with the Budker Institute of Nuclear Physics

  9. RHIC control system

    Energy Technology Data Exchange (ETDEWEB)

    Barton, D.S. E-mail: dsbarton@bnl.gov; Binello, S.; Buxton, W.; Clifford, T.; D' Ottavio, T.; Hartmann, H.; Hoff, L.T.; Katz, R.; Kennell, S.; Kerner, T.; Laster, J.; Lee, R.C.; Marusic, A.; Michnoff, R.; Morris, J.; Oerter, B.R.; Olsen, R.; Piacentino, J.; Skelly, J.F

    2003-03-01

    The RHIC control system architecture is hierarchical and consists of two physical layers with a fiber-optic network connection. The Front-End Level systems consist of VME chassis with processors running a real-time operating system and both VME I/O modules and remote bus interfaces. Accelerator device software interfaces are implemented as objects in C++. The network implementation uses high speed, switched Ethernet technology. Specialized hardware modules were built for waveform control of power supplies, multiplexed signal acquisition, and timing services. The Console Level systems are Unix workstations. A strong emphasis has been given to developing highly reusable, standard software tools for use in building physics and diagnostic application software.

  10. RHIC control system

    International Nuclear Information System (INIS)

    Barton, D.S.; Binello, S.; Buxton, W.; Clifford, T.; D'Ottavio, T.; Hartmann, H.; Hoff, L.T.; Katz, R.; Kennell, S.; Kerner, T.; Laster, J.; Lee, R.C.; Marusic, A.; Michnoff, R.; Morris, J.; Oerter, B.R.; Olsen, R.; Piacentino, J.; Skelly, J.F.

    2003-01-01

    The RHIC control system architecture is hierarchical and consists of two physical layers with a fiber-optic network connection. The Front-End Level systems consist of VME chassis with processors running a real-time operating system and both VME I/O modules and remote bus interfaces. Accelerator device software interfaces are implemented as objects in C++. The network implementation uses high speed, switched Ethernet technology. Specialized hardware modules were built for waveform control of power supplies, multiplexed signal acquisition, and timing services. The Console Level systems are Unix workstations. A strong emphasis has been given to developing highly reusable, standard software tools for use in building physics and diagnostic application software

  11. Brookhaven fastbus/unibus interface

    International Nuclear Information System (INIS)

    Benenson, G.; Bauernfeind, J.; Larsen, R.C.

    1983-01-01

    A typical high energy physics experiment requires both a high speed data acquisition and processing system, for data collection and reduction; and a general purpose computer to handle further reduction, bookkeeping and mass storage. Broad differences in architecture, format or technology, will often exist between these two systems, and interface design can become a formidable task. The PDP-11 series minicomputer is widely used in physics research, and the Brookhaven FASTBUS is the only standard high speed data acquisition system which is fully implemented in a current high energy physics experiment. This paper will describe the design and operation of an interface between these two systems. The major issues are elucidated by a preliminary discussion on the basic principles of Bus Systems, and their application to Brookhaven FASTBUS and UNIBUS

  12. Small Modular Reactors (468th Brookhaven Lecture)

    International Nuclear Information System (INIS)

    Bari, Robert

    2011-01-01

    With good reason, much more media attention has focused on nuclear power plants than solar farms, wind farms, or hydroelectric plants during the past month and a half. But as nations around the world demand more energy to power everything from cell phone batteries to drinking water pumps to foundries, nuclear plants are the only non-greenhouse-gas producing option that can be built to operate almost anywhere, and can continue to generate power during droughts, after the sun sets, and when winds die down. To supply this demand for power, designers around the world are competing to develop more affordable nuclear reactors of the future: small modular reactors. Brookhaven Lab is working with DOE to ensure that these reactors are designed to be safe for workers, members of surrounding communities, and the environment and to ensure that the radioactive materials and technology will only be used for peaceful purposes, not weapons. In his talk, Bari will discuss the advantages and challenges of small modular reactors and what drives both international and domestic interest in them. He will also explain how Brookhaven Lab and DOE are working to address the challenges and provide a framework for small modular reactors to be commercialized.

  13. TRISTAN-II at Brookhaven

    International Nuclear Information System (INIS)

    Chrien, R.E.; Stelts, M.L.; Manzella, V.; Gill, R.; Wohn, F.; Hill, J.C.

    1979-01-01

    The mass separator TRISTAN has been moved to Brookhaven HFBR. A flux of up to 10 11 neutrons/cm 2 /sec will be available on target, and improvements in the ion source and beam optics have been made. A computer system with a CAMAC interface allows data collection from eight independent sources, while a PDP-11/34 computer is available for extensive off-line analysis

  14. B factory at RHIC [Relativistic Heavy Ion Collider]?

    International Nuclear Information System (INIS)

    Lockyer, N.S.; Van Berg, R.; Newcomer, F.M.

    1988-01-01

    A dedicated B physics experiment located in the proposed Relativistic Heavy Ion Collider at Brookhaven (RHIC) is considered. The machine may operate in a p-p mode with a luminosity in excess of 10 32 cm/sup /minus/2/ sec/sup /minus/1/ at 250 /times/ 250 GeV. The estimated B/bar B/ cross section at these energies is about 10 μbarns and a run of 10 7 sec would produce roughly 10 10 B/bar B/ pairs. A comparison to similar ideas proposed for the Fermilab Tevatron Upgrade and the SSC are discussed. The most ambitious physics objective of such an experiment would be the study of CP nonconservation. Particular emphasis at this workshop was given to the self tagging mode B → K + π/sup /minus//. Experimental techniques developed during this experiment would be extremely useful for more ambitious projects anticipated at the SSC. 36 refs., 10 figs

  15. High-energy high-luminosity electron-ion collider eRHIC

    International Nuclear Information System (INIS)

    Litvinenko, V.N.; Ben-Zvi, I.; Hammons, L.; Hao, Y.; Webb, S.

    2011-01-01

    In this paper, we describe a future electron-ion collider (EIC), based on the existing Relativistic Heavy Ion Collider (RHIC) hadron facility, with two intersecting superconducting rings, each 3.8 km in circumference. The replacement cost of the RHIC facility is about two billion US dollars, and the eRHIC will fully take advantage and utilize this investment. We plan adding a polarized 5-30 GeV electron beam to collide with variety of species in the existing RHIC accelerator complex, from polarized protons with a top energy of 325 GeV, to heavy fully-striped ions with energies up to 130 GeV/u. Brookhaven's innovative design, is based on one of the RHIC's hadron rings and a multi-pass energy-recovery linac (ERL). Using the ERL as the electron accelerator assures high luminosity in the 10 33 -10 34 cm -2 sec -1 range, and for the natural staging of eRHIC, with the ERL located inside the RHIC tunnel. The eRHIC will provide electron-hadron collisions in up to three interaction regions. We detail the eRHIC's performance in Section 2. Since first paper on eRHIC paper in 2000, its design underwent several iterations. Initially, the main eRHIC option (the so-called ring-ring, RR, design) was based on an electron ring, with the linac-ring (LR) option as a backup. In 2004, we published the detailed 'eRHIC 0th Order Design Report' including a cost-estimate for the RR design. After detailed studies, we found that an LR eRHIC has about a 10-fold higher luminosity than the RR. Since 2007, the LR, with its natural staging strategy and full transparency for polarized electrons, became the main choice for eRHIC. In 2009, we completed technical studies of the design and dynamics for MeRHIC with 3-pass 4 GeV ERL. We learned much from this evaluation, completed a bottom-up cost estimate for this $350M machine, but then shelved the design. In the same year, we turned again to considering the cost-effective, all-in-tunnel six-pass ERL for our design of the high-luminosity eRHIC. In it

  16. Study of the open charm and Drell-Yan production in p + p collisions at 200 GeV with the Phenix detector at RHIC; Etude de la production de charme ouvert et de Drell-Yan dans les collisions p + p a 200 GeV avec le detecteur Phenix a RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Gadrat, S

    2005-09-15

    Ultra-relativistic heavy ions collisions allow the study of nuclear matter under extreme conditions of temperature and pressure and, more specifically, of a new phase of nuclear matter: the quarks and gluons plasma (QGP). The RHIC collider, located at the Brookhaven National Laboratory (Usa), produces such collisions. PHENIX, one of the four operational detectors at the collider, is the only one capable of measuring muons. In this dissertation, we present a dimuon data analysis, which data have been collected by PHENIX in p + p collisions during two data taking runs (3 and 4). p + p collisions provide a requisite reference for the understanding of heavy ions collisions. The aim of the analysis discussed in this dissertation is to extract the cross sections of the main physical components of the dimuon spectrum observed at RHIC for p + p collisions: J/{psi}, open charm and Drell-Yan. This analysis is based on a global line shape fit of the dimuon mass spectrum. This fit has been possible thanks to prior simulation study of the mass distribution shapes of these different components. Production yields were obtained from the fit. Lastly, the response function study for each components and the use of various efficiencies led to the estimate of the different production cross sections. The results have been compared to other existing measurements and show an overall good agreement. The work presented in this dissertation offers a first estimate of the open charm production cross section in the dimuon channel, as well as a first estimate of the Drell-Yan production cross section at RHIC for p + p collisions: {sigma}(J/{psi} {yields} {mu}{mu}) = (2.9 {+-} 0.1) {mu}b; {sigma}(cc-bar {yields} {mu}{mu}) = (0.96 {+-} 0.18) mb; {sigma}(Drell-Yan {yields} {mu}{mu}) = (0.20 {+-} 0.04) {mu}b.

  17. Electron Cooling of RHIC

    CERN Document Server

    Ben-Zvi, Ilan; Barton, Donald; Beavis, Dana; Blaskiewicz, Michael; Bluem, Hans; Brennan, Joseph M; Bruhwiler, David L; Burger, Al; Burov, Alexey; Burrill, Andrew; Calaga, Rama; Cameron, Peter; Chang, Xiangyun; Cole, Michael; Connolly, Roger; Delayen, Jean R; Derbenev, Yaroslav S; Eidelman, Yury I; Favale, Anthony; Fedotov, Alexei V; Fischer, Wolfram; Funk, L W; Gassner, David M; Hahn, Harald; Harrison, Michael; Hershcovitch, Ady; Holmes, Douglas; Hseuh Hsiao Chaun; Johnson, Peter; Kayran, Dmitry; Kewisch, Jorg; Kneisel, Peter; Koop, Ivan; Lambiase, Robert; Litvinenko, Vladimir N; MacKay, William W; Mahler, George; Malitsky, Nikolay; McIntyre, Gary; Meng, Wuzheng; Merminga, Lia; Meshkov, Igor; Mirabella, Kerry; Montag, Christoph; Nagaitsev, Sergei; Nehring, Thomas; Nicoletti, Tony; Oerter, Brian; Parkhomchuk, Vasily; Parzen, George; Pate, David; Phillips, Larry; Preble, Joseph P; Rank, Jim; Rao, Triveni; Rathke, John; Roser, Thomas; Russo, Thomas; Scaduto, Joseph; Schultheiss, Tom; Sekutowicz, Jacek; Shatunov, Yuri; Sidorin, Anatoly O; Skrinsky, Aleksander Nikolayevich; Smirnov, Alexander V; Smith, Kevin T; Todd, Alan M M; Trbojevic, Dejan; Troubnikov, Grigory; Wang, Gang; Wei, Jie; Williams, Neville; Wu, Kuo-Chen; Yakimenko, Vitaly; Zaltsman, Alex; Zhao, Yongxiang; ain, Animesh K

    2005-01-01

    We report progress on the R&D program for electron-cooling of the Relativistic Heavy Ion Collider (RHIC). This electron cooler is designed to cool 100 GeV/nucleon at storage energy using 54 MeV electrons. The electron source will be a superconducting RF photocathode gun. The accelerator will be a superconducting energy recovery linac. The frequency of the accelerator is set at 703.75 MHz. The maximum electron bunch frequency is 9.38 MHz, with bunch charge of 20 nC. The R&D program has the following components: The photoinjector and its photocathode, the superconducting linac cavity, start-to-end beam dynamics with magnetized electrons, electron cooling calculations including benchmarking experiments and development of a large superconducting solenoid. The photoinjector and linac cavity are being incorporated into an energy recovery linac aimed at demonstrating ampere class current at about 20 MeV. A Zeroth Order Design Report is in an advanced draft state, and can be found on the web at http://www.ags...

  18. Polarized protons at RHIC

    International Nuclear Information System (INIS)

    Tannenbaum, M.J.

    1990-12-01

    The Physics case is presented for the use of polarized protons at RHIC for one or two months each year. This would provide a facility with polarizations of approx-gt 50% high luminosity ∼2.0 x 10 32 cm -2 s -1 , the possibility of both longitudinal and transverse polarization at the interaction regions, and frequent polarization reversal for control of systematic errors. The annual integrated luminosity for such running (∼10 6 sec per year) would be ∫ Ldt = 2 x 10 38 cm -2 -- roughly 20 times the total luminosity integrated in ∼ 10 years of operation of the CERN Collider (∼10 inverse picobarns, 10 37 cm -2 ). This facility would be unique in the ability to perform parity-violating measurements and polarization test of QCD. Also, the existence of p-p collisions in a new energy range would permit the study of ''classical'' reactions like the total cross section and elastic scattering, etc., and serve as a complement to measurements from p-bar p colliders. 11 refs

  19. Spin physics at RHIC

    International Nuclear Information System (INIS)

    Tannenbaum, M.J.

    1996-01-01

    Operation of RHIC with two beams of highly polarized protons (70%, either longitudinal or transverse) at high luminosity L = 2 x 10 32 cm -2 sec -1 for two months/year will allow the STAR and PHENIX detectors to perform high statististics studies of polarization phenomena in the perturbative region of hard scattering where both QCD and ElectroWeak theory make detailed predictions for polarization effects. The collision c.m. energy, √s = 200 - 500 GeV, represents a new domain for the study of spin. Direct photon production will be used to measure the gluon polarization in the polarized proton. A new twist comes from W-boson production which is expected to be 100% parity violating and will thus allow measurements of flavor separated Quark and antiquark (u, bar u, d, bar d) polarization distributions. Searches for parity violation in strong interaction processes such as jet and leading particle production will be a sensitive way to look for new physics beyond the standard model, one possibility being quark substructure

  20. FAST AUTOMATED DECOUPLING AT RHIC

    International Nuclear Information System (INIS)

    BEEBE-WANG, J.J.

    2005-01-01

    Coupling correction is essential for the operational performance of RHIC. The independence of the transverse degrees of freedom makes diagnostics and tune control easier, and it is advantageous to operate an accelerator close to the coupling resonance to minimize nearby nonlinear sidebands. An automated coupling correction application iDQmini has been developed for RHIC routine operations. The application decouples RHIC globally by minimizing the tune separation through finding the optimal settings of two orthogonal skew quadrupole families. The program iDQmini provides options of automatic, semi-automatic and manual decoupling operations. It accesses tune information from all RHIC tune measurement systems: the PLL (phase lock loop), the high frequency Schottky system and the tune meter. It also supplies tune and skew quadrupole scans, finding the minimum tune separation, display the real time results and interface with the RHIC control system. We summarize the capabilities of the coupling correction application iDQmini, and discuss the operational protections incorporated in the program

  1. The RHIC injection fast kicker

    International Nuclear Information System (INIS)

    Forsyth, E.B.; Pappas, G.C.; Tuozzolo, J.E.; Zhang, W.

    1995-01-01

    The purpose of the injection kicker is to provide the ultimate deflection to the incoming beam from the Alternating Gradient Synchrotron (AGS) into the Relativistic Heavy Ion Collider (RHIC). The beam is kicked in the vertical direction to place it on the equilibrium orbit of RHIC. Each bunch in the AGS is transferred separately, and stacked box-car fashion in the appropriate RHIC rf bucket. In order to achieve the required deflection angle four magnets powered by four pulsers will be used for each ring of RHIC. When the bunches are stacked in RHIC the last few rf buckets are left unfilled in order to provide a gap in the beam to facilitate the ejection or beam abort process. This also means there is not a severe constraint on the fall-time of the injection kicker. One prototype pulser has been built and tested. Much of the development effort has gone into the magnet design. Although lumped ferrite magnets are simpler to build and require less power to reach full field, a transmission line magnet was developed because of the very fast rise-time requirement and the tolerances imposed on the field variation and ripple

  2. RESEARCH PLAN FOR SPIN PHYSICS AT RHIC.

    Energy Technology Data Exchange (ETDEWEB)

    AIDALA, C.; BUNCE, G.; ET AL.

    2005-02-01

    In this report we present the research plan for the RHIC spin program. The report covers (1) the science of the RHIC spin program in a world-wide context; (2) the collider performance requirements for the RHIC spin program; (3) the detector upgrades required, including timelines; (4) time evolution of the spin program.

  3. PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 2 D/F WASTE LINE REMOVAL, BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    International Nuclear Information System (INIS)

    Weaver, P.C.

    2010-01-01

    Oak Ridge Institute for Science and Education (ORISE) has reviewed the project documentation and data for the High Flux Beam Reactor (HFBR) Underground Utilities removal Phase 2; the D/F Waste Line removal at Brookhaven National Laboratory (BNL) in Upton, New York. The Brookhaven Survey Group (BSG) has completed removal and performed the final status survey (FSS) of the D/F Waste Line that provided the conduit for pumping waste from Building 750 to Building 801. Sample results have been submitted as required to demonstrate that the cleanup goals of 15 mrem/yr above background to a resident in 50 years have been met. Four rounds of sampling, from pre-excavation to final status survey (FSS), were performed as specified in the Field Sampling Plan (FSP) (BNL 2010a). It is the policy of the US Departmental of Energy (DOE) to perform independent verifications of decontamination and decomissioning activities conducted at DOE facilities. ORISE has been designated as the organization responsible for this task at the HFBR. ORISE together with DOE determined that a Type A verification of the D/F Waste Line was appropriate based on its method of construction and upon the minimal potential for residual radioactivity in the area. The removal of underground utilities is being performed in three stages in the process to decommission the HFBR facility and support structures. Phase 2 of this project included the grouting and removal of 1100 feet of 2-inch pipe and 640 feet of 4-inch pipe that served as the D/F Waste Line. Based on the pre-excavation sample results of the soil overburden, the potential for contamination of the soil surrounding the pipe is minimal (BNL 2010a). ORISE reviewed the BNL FSP and identified comments for consideration (ORISE 2010). BNL prepared a revised FSP that addressed each ORISE comment adequately (BNL 2010a). ORISE referred to the revised Phase 2 D/F Waste Line removal FSP FSS data to conduct the Type A verification and determine whether the intent odf

  4. Ion optics of RHIC EBIS

    Energy Technology Data Exchange (ETDEWEB)

    Pikin, A.; Alessi, J.; Beebe, E.; Kponou, A.; Okamura, M.; Raparia, D.; Ritter, J.; Tan, Y.; Kuznetsov, G.

    2011-09-10

    RHIC EBIS has been commissioned to operate as a versatile ion source on RHIC injection facility supplying ion species from He to Au for Booster. Except for light gaseous elements RHIC EBIS employs ion injection from several external primary ion sources. With electrostatic optics fast switching from one ion species to another can be done on a pulse to pulse mode. The design of an ion optical structure and the results of simulations for different ion species are presented. In the choice of optical elements special attention was paid to spherical aberrations for high-current space charge dominated ion beams. The combination of a gridded lens and a magnet lens in LEBT provides flexibility of optical control for a wide range of ion species to satisfy acceptance parameters of RFQ. The results of ion transmission measurements are presented.

  5. RHIC off-line computing

    International Nuclear Information System (INIS)

    Featherly, J.; Gibbard, B.; Gould, J.

    1993-01-01

    A report was prepared in Sept 1992, RHIC/DET Note 8, also known as ROCOCO, which estimated the various computing resources which will be required by the RHIC experimental program. A study has now been undertaken to review technical issues associated with supplying these resources. This study, organized by the HEP/NP Computing Group but including other appropriate participants, addresses questions of technologies, manpower, cost and schedule. The following document is an interim summary of this study both in terms of discussions which have occurred and initial conclusions reached

  6. Parity violation experiments at RHIC

    International Nuclear Information System (INIS)

    Tannenbaum, M.J.

    1993-01-01

    With longitudinally polarized protons at RHIC, even a 1 month dedicated run utilizing both approved major detectors could produce a significant search for new physics in hadron collisions via parity violation. Additionally, in the energy range of RHIC, large ''conventional'' parity violating effects are predicted due to the direct production of the weak bosons W ± and Z 0 . One can even envision measurements of the spin dependent sea-quark structure functions of nucleons using the single-spin parity violating asymmetry of W ± and Z 0

  7. The Quest for High Luminosity in Hadron Colliders (413th Brookhaven Lecture)

    International Nuclear Information System (INIS)

    Fischer, Wolfram

    2006-01-01

    In 1909, by bombarding a gold foil with alpha particles from a radioactive source, Ernest Rutherford and coworkers learned that the atom is made of a nucleus surrounded by an electron cloud. Ever since, scientists have been probing deeper and deeper into the structure of matter using the same technique. With increasingly powerful machines, they accelerate beams of particles to higher and higher energies, to penetrate more forcefully into the matter being investigated and reveal more about the contents and behavior of the unknown particle world. To achieve the highest collision energies, projectile particles must be as heavy as possible, and collide not with a fixed target but another beam traveling in the opposite direction. These experiments are done in machines called hadron colliders, which are some of the largest and most complex research tools in science. Five such machines have been built and operated, with Brookhaven's Relativistic Heavy Ion Collider (RHIC) currently the record holder for the total collision energy. One more such machine is under construction. Colliders have two vital performance parameters on which their success depends: one is their collision energy, and the other, the number of particle collisions they can produce, which is proportional to a quantity known as the luminosity. One of the tremendous achievements in the world's latest collider, RHIC, is the amazing luminosity that it produces in addition to its high energy. To learn about the performance evolution of these colliders and the way almost insurmountable difficulties can be overcome, especially in RHIC, join Wolfram Fischer, a physicist in the Collider-Accelerator (C-A) Department, who will give the next Brookhaven Lecture, on 'The Quest for High Luminosity in Hadron Colliders.'

  8. The Shape and Flow of Heavy Ion Collisions (490th Brookhaven Lecture)

    Energy Technology Data Exchange (ETDEWEB)

    Schenke, Bjoern [BNL Physics Department

    2014-12-18

    The sun can’t do it, but colossal machines like the Relativistic Heavy Ion Collider (RHIC) at Brookhaven Lab and Large Hadron Collider (LHC) in Europe sure can. Quarks and gluons make up protons and neutrons found in the nucleus of every atom in the universe. At heavy ion colliders like RHIC and the LHC, scientists can create matter more than 100,000 times hotter than the center of the sun—so hot that protons and neutrons melt into a plasma of quarks and gluons. The particle collisions and emerging quark-gluon plasma hold keys to understanding how these fundamental particles interact with each other, which helps explain how everything is held together—from atomic nuclei to human beings to the biggest stars—how all matter has mass, and what the universe looked like microseconds after the Big Bang. Dr. Schenke discusses theory that details the shape and structure of heavy ion collisions. He will also explain how this theory and data from experiments at RHIC and the LHC are being used to determine properties of the quark-gluon plasma.

  9. Minutes of the Fourth Annual Meeting of the Panel on Reference Nuclear Data, Brookhaven National Laboratory, November 1-2, 1979

    International Nuclear Information System (INIS)

    Burrows, T.W.; Stewart, L.; Coyne, J.J.

    1980-06-01

    After the welcome and approval of the agenda and of the minutes of the Third Annual Meeting, the participants turned to reactor physics data needs, CTR data needs, status of international and national cooperation, status and availability of data files, election of officers, status of publications, biomedical data needs, and miscellaneous action items from the Third Meeting. A summary of recommendations and action items is given. Eighteen appendixes are included

  10. Minutes of the Fourth Annual Meeting of the Panel on Reference Nuclear Data, Brookhaven National Laboratory, November 1-2, 1979. [BNL, Nov. 1-2, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Burrows, T.W.; Stewart, L.; Coyne, J.J. (eds.)

    1980-06-01

    After the welcome and approval of the agenda and of the minutes of the Third Annual Meeting, the participants turned to reactor physics data needs, CTR data needs, status of international and national cooperation, status and availability of data files, election of officers, status of publications, biomedical data needs, and miscellaneous action items from the Third Meeting. A summary of recommendations and action items is given. Eighteen appendixes are included. (RWR)

  11. SCHOTTKY MEASUREMENTS DURING RHIC 2000

    International Nuclear Information System (INIS)

    CAMERON, P.; CUPOLO, J.; DEGEN, C.; HAMMONS, L.; KESSELMAN, M.; LEE, R.; MEYER, A.; SIKORA, R.

    2001-01-01

    The 2GHz Schottky system was a powerful diagnostic during RHIC 2000 commissioning. A continuous monitor without beam excitation, it provided betatron tune, chromaticity, momentum spread relative emittance, and synchrotron tune. It was particularly useful during transition studies. In addition, a BPM was resonated at 230MHz for Schottky measurements

  12. The superconducting x-ray lithography source program at Brookhaven

    Energy Technology Data Exchange (ETDEWEB)

    Williams, G. P.; Heese, R. N.; Vignola, G.; Murphy, J. B.; Godel, J. B.; Hsieh, H.; Galayda, J.; Seifert, A.; Knotek, M. L.

    1989-07-01

    A compact electron storage ring with superconducting dipole magnets, is being developed at the National Synchrotron Light Source at Brookhaven. The parameters of the source have been optimized for its future use as an x-ray source for lithography. This first ring is a prototype which will be used to study the operating characteristics of machines of this type with particular attention being paid to low-energy injection and long beam lifetime.

  13. Study of ν interactions at Brookhaven using counter techniques

    International Nuclear Information System (INIS)

    Williams, H.H.

    1977-01-01

    A review is presented of neutrino elastic scattering, νp → νp and anti νp → anti νp, as observed by the Harvard-Pennsylvania-Wisconsin (HPW) and Columbia-Illinois-Rockefeller (CIR) experiments at Brookhaven National Laboratory. Results from the CIR experiment on (anti) νN → (anti) νNπsup(o) are also discussed. (orig.) [de

  14. The Brookhaven Accelerator Test Facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Chou, T.S.; Fernow, R.C.; Fischer, J.; Gallardo, J.; Kirk, H.G.; Koul, R.; Palmer, R.B.; Pellegrini, C.; Sheehan, J.; Srinivasan-Rao, T.; Ulc, S.; Woodle, M.; Bigio, I.; Kurnit, N.; McDonald, K.T.

    1989-01-01

    The Brookhaven Accelerator Test Facility ATF will consist of a 50-100 MeV/c electron linac and a 100 GW CO 2 laser system. A high brightness RF-gun operating at 2,856 MHz is to be used as the injector into the linac. The RF-gun contains a Nd:Yag-laser-driven photocathode capable of producing a stream of six ps electron pulses separated by 12.5 ns. The maximum charge in a micropulse will be one nano-Coulomb. The CO 2 laser pulse length will be a few picoseconds and will be synchronized with the electron pulse. The first experimental beam is expected in Fall 89. The design electron beam parameters are given and possible initial experiments are discussed. 9 refs., 1 fig., 3 tabs

  15. The Brookhaven Accelerator Test Facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Chou, T.S.; Fernow, R.C.

    1988-01-01

    The Brookhaven Accelerator Test Facility (ATF) will consist of a 50--100 MeV/c electron linac and a 100 GW CO 2 laser system. A high brightness RF-gun operating at 2856 MHz is to be used as the injector into the linac. The RF-gun contains a Nd:Yag-laser-driven photocathode capable of producing a stream of six ps electron pulses separated by 12.5 ns. The maximum charge in a micropulse will be one nano-Coulomb. The CO 2 laser pulse length will be a few picoseconds and will be synchronized with the electron pulse. The first experimental beam is expected in Fall 89. The design electron beam parameters are given and possible initial experiments are discussed. 9 refs., 1 fig., 3 tabs

  16. Neutron detector development at Brookhaven

    International Nuclear Information System (INIS)

    Yu, B.; Harder, J.A.; Mead, J.A.; Radeka, V.; Schaknowski, N.A.; Smith, G.C.

    2003-01-01

    Two-dimensional thermal neutron detectors have been the subject of research and development at Brookhaven for over 20 years. Based primarily on multi-wire chambers filled with a gas mixture containing 3 He, these detectors have been used in wide-ranging studies of molecular biology and material science samples. At each phase of development, experimenters have sought improvements in key parameters such as position resolution, counting rate, efficiency, solid-angle coverage and stability. A suite of detectors has been developed with sensitive areas ranging from 5x5 to 50x50 cm 2 . These devices incorporate low-noise-position readout and the best position resolution for thermal neutron gas detectors. Recent developments include a 1.5 mx20 cm detector containing multiple segments with continuously sensitive readout, and detectors with unity gain for ultra-high rate capability and long-term stability

  17. Recent results of the STAR high-energy polarized proton-proton program at RHIC at BNL

    International Nuclear Information System (INIS)

    Surrow, Bernd

    2007-01-01

    The STAR experiment at the Relativistic Heavy-Ion Collider (RHIC) at Brookhaven National Laboratory (BNL) is carrying out a spin physics program colliding transverse or longitudinal polarized proton beams at √(s) 200 - 500GeV to gain a deeper insight into the spin structure and dynamics of the proton. These studies provide fundamental tests of Quantum Chromodynamics (QCD).One of the main objectives of the STAR spin physics program is the determination of the polarized gluon distribution function through a measurement of the longitudinal double-spin asymmetry, ALL, for various processes. Recent results will be shown on the measurement of ALL for inclusive jet production, neutral pion production and charged pion production at √(s) = 200GeV. In addition to these measurements involving longitudinal polarized proton beams, the STAR collaboration has performed several important measurements employing transverse polarized proton beams. New results on the measurement of the transverse single-spin asymmetry, AN, for forward neutral pion production and the first measurement of AN for mid-rapidity di-jet production will be discussed

  18. Proceedings of RIKEN BNL Research Center Workshop: Brookhaven Summer Program on Quarkonium Production in Elementary and Heavy Ion Collisions

    Energy Technology Data Exchange (ETDEWEB)

    Dumitru, A.; Lourenco, C.; Petreczky, P.; Qiu, J., Ruan, L.

    2011-08-03

    Understanding the structure of the hadron is of fundamental importance in subatomic physics. Production of heavy quarkonia is arguably one of the most fascinating subjects in strong interaction physics. It offers unique perspectives into the formation of QCD bound states. Heavy quarkonia are among the most studied particles both theoretically and experimentally. They have been, and continue to be, the focus of measurements in all high energy colliders around the world. Because of their distinct multiple mass scales, heavy quarkonia were suggested as a probe of the hot quark-gluon matter produced in heavy-ion collisions; and their production has been one of the main subjects of the experimental heavy-ion programs at the SPS and RHIC. However, since the discovery of J/psi at Brookhaven National Laboratory and SLAC National Accelerator Laboratory over 36 years ago, theorists still have not been able to fully understand the production mechanism of heavy quarkonia, although major progresses have been made in recent years. With this in mind, a two-week program on quarkonium production was organized at BNL on June 6-17, 2011. Many new experimental data from LHC and from RHIC were presented during the program, including results from the LHC heavy ion run. To analyze and correctly interpret these measurements, and in order to quantify properties of the hot matter produced in heavy-ion collisions, it is necessary to improve our theoretical understanding of quarkonium production. Therefore, a wide range of theoretical aspects on the production mechanism in the vacuum as well as in cold nuclear and hot quark-gluon medium were discussed during the program from the controlled calculations in QCD and its effective theories such as NRQCD to various models, and to the first principle lattice calculation. The scientific program was divided into three major scientific parts: basic production mechanism for heavy quarkonium in vacuum or in high energy elementary collisions; the

  19. Proceedings of RIKEN BNL Research Center Workshop: Brookhaven Summer Program on Quarkonium Production in Elementary and Heavy Ion Collisions

    International Nuclear Information System (INIS)

    Dumitru, A.; Lourenco, C.; Petreczky, P.; Qiu, J.; Ruan, L.

    2011-01-01

    Understanding the structure of the hadron is of fundamental importance in subatomic physics. Production of heavy quarkonia is arguably one of the most fascinating subjects in strong interaction physics. It offers unique perspectives into the formation of QCD bound states. Heavy quarkonia are among the most studied particles both theoretically and experimentally. They have been, and continue to be, the focus of measurements in all high energy colliders around the world. Because of their distinct multiple mass scales, heavy quarkonia were suggested as a probe of the hot quark-gluon matter produced in heavy-ion collisions; and their production has been one of the main subjects of the experimental heavy-ion programs at the SPS and RHIC. However, since the discovery of J/psi at Brookhaven National Laboratory and SLAC National Accelerator Laboratory over 36 years ago, theorists still have not been able to fully understand the production mechanism of heavy quarkonia, although major progresses have been made in recent years. With this in mind, a two-week program on quarkonium production was organized at BNL on June 6-17, 2011. Many new experimental data from LHC and from RHIC were presented during the program, including results from the LHC heavy ion run. To analyze and correctly interpret these measurements, and in order to quantify properties of the hot matter produced in heavy-ion collisions, it is necessary to improve our theoretical understanding of quarkonium production. Therefore, a wide range of theoretical aspects on the production mechanism in the vacuum as well as in cold nuclear and hot quark-gluon medium were discussed during the program from the controlled calculations in QCD and its effective theories such as NRQCD to various models, and to the first principle lattice calculation. The scientific program was divided into three major scientific parts: basic production mechanism for heavy quarkonium in vacuum or in high energy elementary collisions; the

  20. Demonstration of In-Situ Stabilization of Buried Waste at Pit G-11 at the Brookhaven National laboratory Glass Pits Disposal Site

    International Nuclear Information System (INIS)

    Dwyer, B.P.; Gilbert, J.; Heiser, J.

    1999-01-01

    In 1989 BNL was added to the EPAs National Priorities List. The site is divided into seven operable units (OU). OU-I includes the former landfill area. The field task site is noted as the AOC 2C Glass Holes location. Beginning in the 1960s and continuing into the 1980s, BNL disposed of laboratory waste (glassware, chemicals and animal carcasses) in numerous shallow pits. The drivers for remediating the pits are; historical records that indicate hazardous materials may have been disposed of in the pits; ground water contamination down gradient of the pits; a test excavation of one of the glass holes that unearthed laboratory glass bottles with unidentified liquids still contained; and the fact that BNL rests atop an EPA designated sole-source aquifer. The specific site chosen for this demonstration was pit G-11. The requirements that lead to choosing this pit were; a well characterized pit and a relatively isolated pit where our construction operations would not impact on adjacent pits. The glass holes area, including pit G-11, was comprehensively surveyed using a suite of geophysical techniques (e.g., EM-31, EM-61, GPR). Prior to stabilizing the waste form a subsurface barrier was constructed to contain the entire waste pit. The pit contents were then stabilized using a cement grout applied via jet grouting. The stabilization was performed to make removal of the waste from the pit easier and safer in terms of worker exposure. The grouting process would mix and masticate the waste and grout and form a single monolithic waste form. This large monolith would then be subdivided into smaller 4 foot by 4 foot by 10-12 foot block using a demolition grout. The smaller blocks would then be easily removed from the site and disposed of in a CERCLA waste site

  1. Barrier Cavities in the Brookhaven AGS

    International Nuclear Information System (INIS)

    Blaskiewicz, M.; Brennan, J. M.; Roser, T.; Smith, K.; Spitz, R.; Zaltsman, A.; Fujieda, M.; Iwashita, Y.; Noda, A.; Yoshii, M.; Mori, Y.; Ohmori, C.; Sato, Y.

    1999-01-01

    In collaboration with KEK two barrier cavities, each generating 40 kV per turn have been installed in the Brookhaven AGS. Machine studies are described and their implications for high intensity operations are discussed

  2. Physics with tagged forward protons at RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Yip,K.

    2009-08-30

    The physics reach of the STAR detector at RHIC has been extended to include elastic and inelastic diffraction measurements with tagged forward protons. This program has started at RHIC in p+p collisions with a special optics run of {beta}* {approx} 21 m at STAR, at the center-of-mass energy {radical}s = 200 GeV during the last week of the RHIC 2009 run.

  3. Prospects for spin physics at RHIC

    International Nuclear Information System (INIS)

    Robinett, R.W.; Pennsylvania State Univ., University Park, PA

    1995-06-01

    The proposal to perform polarized proton-proton collisions at collider energies at RHIC is reviewed. After a brief reminder of the desirability of high energy spin physics measurements, we discuss the machine parameters and detector features which are taken to define a program of spin physics at RHIC. Some of the many physics processes which can provide information on polarized parton distributions and the spin-dependence of QCD and the electroweak model at RHIC energies are discussed

  4. RHIC Sextant Test -- Physics and performance

    International Nuclear Information System (INIS)

    Wei, J.; Fischer, W.; Ahrens, L.

    1997-01-01

    This paper presents beam physics and machine performance results of the Relativistic Heavy Ion Collider (RHIC) Sextant and AGS-to-RHIC (AtR) transfer line during the Sextant Test in early 1997. Techniques used to measure both machine properties (difference orbits, dispersion, and beamline optics) and beam parameters (energy, intensity, transverse and longitudinal emittances) are described. Good agreement was achieved between measured and design lattice optics. The gold ion beam quality was shown to approach RHIC design requirements

  5. Tau electron atoms at RHIC

    International Nuclear Information System (INIS)

    Weiss, M.S.

    1985-01-01

    An amusement ancillary to the proposed quark-gluon plasma production hypothesized from a relativistic heavy ion collider (RHIC is a sufficient quantity of tau electrons to potentially admit the study of its exotic atoms. In this paper the given wealth of nuclear phenomena is derived from muonic atoms assume a tau atom is more forthcoming of information due to the lower orbits entirely contained within the nucleus. It is the purpose of this brief note to discuss the production mechanism at a RHIC and to delineate some of the more obvious properties of the tau atom. As in the case of the mu, more exotic phenomena derived from resonance ''accidents'' with nuclear transitions takes place, but it would be presumptions to discuss them at this time. Given the complete containment in nuclear matter of the tau lepton in its innermost atomic orbits. An experiment performed with such an exotic species results in the measurement of its lifetime

  6. Transverse energy production at RHIC

    International Nuclear Information System (INIS)

    Sahoo, Raghunath

    2006-01-01

    The quest for understanding of the possible formation and existence of the quark-gluon plasma (Qp), the deconfined phase of quarks and gluons, has been a major area of research in high energy nuclear physics. High energy nuclear collisions at the Relativistic Heavy Ion Collider (RHIC) has opened a new domain for the exploration of strongly interacting matter at very high energy density and temperature

  7. Monolithic readout circuits for RHIC

    International Nuclear Information System (INIS)

    O'Connor, P.; Harder, J.; Sippach, W.

    1991-10-01

    Several CMOS ASICs have been developed for a proposed RHIC experiment. This paper discusses why ASIC implementation was chosen for certain functions, circuit specifications and the design techniques used to meet them, and results of simulations and early prototypes. By working closely together from an early stage in the planning process, in-house ASIC designers and detector and data acquisition experimenters can achieve optimal use of this important technology

  8. Monolithic readout circuits for RHIC

    Energy Technology Data Exchange (ETDEWEB)

    O`Connor, P.; Harder, J. [Brookhaven National Laboratory, Upton, NY (United States)

    1991-12-31

    Several CMOS ASICs have been developed for a proposed RHIC experiment. This paper discusses why ASIC implementation was chosen for certain functions, circuit specifications and the design techniques used to meet them, and results of simulations and early prototypes. By working closely together from an early stage in the planning process, in-house ASIC designers and detector and data acquisition experimenters can achieve optimal use of this important technology.

  9. The STAR experiment at RHIC

    International Nuclear Information System (INIS)

    Marx, J.N.

    1994-01-01

    STAR (Solenoidal Tracker at RHIC) will be one of two large, sophisticated experiments ready to take data when the Relativistic Heavy Ion Collider (RHIC) comes on-line in 1999. The design of STAR, its construction and commissioning and the physics program using the detector are the responsibility of a collaboration of over 250 members from 30 institutions, world-wide. The overall approach of the STAR Collaboration to the physics challenge of studying collisions of highly relativistic nuclei is to focus on measurements of the properties of the many hadrons produced in the collisions. The STAR detector is optimized to detect and identify hadrons over a large solid angle so that individual events can be characterized, in detail, based on their hadronic content. The broad capabilities of the STAR detector will permit an examination of a wide variety of proposed signatures for the Quark Gluon Plasma (QGP), using the sample of events which, on an event-by-event basis, appear to come from collisions resulting in a large energy density over a nuclear volume. In order to achieve this goal, the STAR experiment is based on a solenoid geometry with tracking detectors using the time projection chamber approach and covering a large range of pseudo-rapidity so that individual tracks can be seen within the very high track density expected in central collisions at RHIC. STAR also uses particle identification by the dE/dx technique and by time-of-flight. Electromagnetic energy is detected in a large, solid-angle calorimeter. The construction of STAR, which will be located in the Wide Angle Hall at the 6 o'clock position at RHIC, formally began in early 1993

  10. DESIGN ISSUES FOR THE RHIC EBIS

    International Nuclear Information System (INIS)

    Beebe, E.; Alessi, J.; Kponou, A.; Pikin, A.; Prelec, K.; Kuznetzov, G.; Tiunov, M.

    2000-01-01

    Promising results are currently being obtained on the BNL Electron Beam Test Stand (EBTS), which is a prototype for the Relativistic Heavy Ion Collider (RHIC) EBIS. Based on the present-results, a proposal has been made regarding the general design of the RHIC EBIS. During the next year experiments will be made to investigate physics issues and beam properties important to the detailed design of the RHIC EBIS. Below we have outlined some of the physics issues to be explored experimentally, beam diagnostics that will be employed, and hardware modifications that are desired to go from the prototype stage to the RHIC EBIS

  11. Joining the RHIC Online and Offline Models

    CERN Document Server

    Malitsky, Nikolay; Fedotov, Alexei V; Kewisch, Jorg; Luccio, Alfredo U; Pilat, Fulvia Caterina; Ptitsyn, Vadim; Satogata, Todd; Talman, Richard M; Tepikian, Steven; Wei, Jie

    2005-01-01

    The paper presents an interface encompassing the RHIC online ramp model and the UAL offline simulation framework. The resulting consolidated facility aims to minimize the gap between design and operational data, and to facilitate analysis of RHIC performance and future upgrades in an operational context. The interface is based on the Accelerator Description Exchange Format (ADXF), and represents a snapshot of the RHIC online model which is in turn driven by machine setpoints. This approach is also considered as an intermediate step towards integrating the AGS and RHIC modeling environments to produce a unified online and offline AGS model for operations.

  12. Superconducting devices at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Dahl, P.F.

    1978-04-01

    The various ongoing programs in applied superconductivity supported by BNL are summarized, including the development of high field ac and dc superconducting magnets for accelerators and other applications, of microwave deflecting cavities for high energy particle beam separators, and of cables for underground power transmission, and materials research on methods of fabricating new superconductors and on metallurgical properties affecting the performance of superconducting devices

  13. Linear accelerator development at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Batchelor, K.

    1976-01-01

    A description is given of operating experience on the 200 MeV Proton Injector Linace of the A.G.S. emphasizing developments in field phase and amplitude control and beam diagnostics. Developments in auxilliary use of the machine are also described

  14. High energy physics at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Samios, N.P.

    1982-01-01

    The high energy plans at BNL are centered around the AGS and ISABELLE, or a variant thereof. At present the AGS is maintaining a strong and varied program. This last year a total of 4 x 10 19 protons were delivered on target in a period of approximately 20 weeks. Physics interest is very strong, half of the submitted proposals are rejected (thereby maintaining high quality experiments) and the program is full over the next two years. The future colliding beam facility will utilize the AGS as an injector and will be a dedicated facility. It will have six intersection regions, run > 10 7 sec/year, and explore a new domain of energy and luminosity. Common to all the considered alternatives is a large aperture proton ring. These possible choices involve pp, ep, and heavy ion variants. The long term philosophy is to run the AGS as much as possible, continuously to upgrade it in performance and reliability, and then to phase it down as the new collider begins operation

  15. Linear accelerator development at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Batchelor, K.

    1976-01-01

    This paper describes the operating experience on the 200 MeV proton injector linac of the A.G.S. emphasizing developments in field phase and amplitude control and beam diagnostics. Developments in auxilliary use of the machine are also described. (author)

  16. BWR stability analysis at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Wulff, W.; Cheng, H.S.; Mallen, A.N.; Rohatgi, U.S.

    1991-01-01

    Following the unexpected, but safely terminated, power and flow oscillations in the LaSalle-2 Boiling Water Reactor (BWR) on March 9, 1988, the Nuclear Regulatory Commission (NRC) Offices of Nuclear Reactor Regulation (NRR) and of Analysis and Evaluation of Operational Data (AEOD) requested that the Office of Nuclear Regulatory Research (RES) carry out BWR stability analyses, centered around fourteen specific questions. Ten of the fourteen questions address BWR stability issues in general and are dealt with in this paper. The other four questions address local, out-of-phase oscillations and matters of instrumentation; they fall outside the scope of the work reported here. It was the purpose of the work documented in this report to answer ten of the fourteen NRC-stipulated questions. Nine questions are answered by analyzing the LaSalle-2 instability and related BWR transients with the BNL Engineering Plant Analyzer (EPA) and by performing an uncertainty assessment of the EPA predictions. The tenth question is answered on the basis of first principles. The ten answers are summarized

  17. High energy physics at Brookhaven National Lab

    International Nuclear Information System (INIS)

    Samios, N.P.

    1982-01-01

    The AGS is supporting an exciting, vibrant, and vital program. There are at present two modes of operation, Fast Extracted Beam (FEB) with a 1.4 second repetition rate and Slow Extracted Beam (SEB) with a 2 second repetition rate. The average intensity is 8 x 10/sup 12/ protons per pulse with peaks at 10/sup 13/ ppp. The FEB mode is mainly utilized for neutrino physics involving large detectors, 100-200 tons, placed at varying distances from the target, 300 meters and 1 kilometer. In the slow mode there is a one second flat top during which the beam emerges uniformly in time and it is split into four target stations: A, B, C, and D. These four are simultaneously illuminated and the fractions on each can be varied. A listing of the types of approved experiments is presented with their appropriate beam locations. The experimental program ran for 22 weeks. Over 200 users practice their trade at the AGS and the program is sufficiently rich that there is a reasonable chance that one or more experimenters will uncover new results that will change the way we think about particle physics

  18. Reactor operations Brookhaven medical research reactor, Brookhaven high flux beam reactor informal monthly report

    International Nuclear Information System (INIS)

    Hauptman, H.M.; Petro, J.N.; Jacobi, O.

    1995-04-01

    This document is the April 1995 summary report on reactor operations at the Brookhaven Medical Research Reactor and the Brookhaven High Flux Beam Reactor. Ongoing experiments/irradiations in each are listed, and other significant operations functions are also noted. The HFBR surveillance testing schedule is also listed

  19. The e+, e- background at Relativistic Heavy Ion Collider (RHIC) generated by beam crossing

    International Nuclear Information System (INIS)

    Rhoades-Brown, M.J.; Ludlam, T.; Wu, J.; Bottcher, C.; Strayer, M.

    1990-01-01

    At the Brookhaven Relativistic Heavy Ion Collider (RHIC), fully stripped heavy ions will circulate in each of two rings up to beam energies of 250 (Z/A) GeV/u. During the beam crossing, the peripheral electromagnetic interaction between the heavy ions is sufficient to induce copious production of di-lepton pairs. These pairs are a potential source of background for the detectors at RHIC. In this paper we discuss the expected number of e + ,e - pairs, given the accepted initial luminosity value L of the collider. More importantly, we also calculate the differential cross sections for the angle, energy, rapidity and momentum distribution of the leptons. Using the luminosity L of the collider, these differential cross sections are normalized to the expected number of leptons per second. We restrict ourselves to e + ,e - production, a discussion of μ + ,μ - and τ + τ - distributions will be published later. The results are presented for the expected worst case, namely 197 Au 79+ ions at a beam kinetic energy of 100 GeV/u. This is forseen to be the heaviest ion for high luminosity experiments at RHIC. We note for a given energy, the cross section for e + ,e - production scales as Z 4 , where Z is the atomic number of the ions

  20. The heavy ion injection scheme for RHIC [Relativistic Heavy Ion Collider

    International Nuclear Information System (INIS)

    Rhoades-Brown, M.J.

    1989-01-01

    The Relativistic Heavy Ion Collider (RHIC) at Brookhaven has a multi-component injection system. The Collider requires very heavy ions such as 79 197 Au to be injected fully stripped of atomic electrons, at a kinetic energy of approximately 10 GeV/nucleon. However, the heavy ions are produced initially at a negative ion source and accelerated first in a 15 MV Tandem. These partially stripped ions have a kinetic energy of approximately 1 MeV/nucleon on leaving the Tandem. In order to achieve the injection requirements for RHIC, the partially stripped ions are accelerated in the Booster (currently under construction) and pass through a stripping foil on their way to the Alternating Gradient Synchrotron (AGS), where they are further accelerated before injection into RHIC. Recent theoretical calculations have shown quite convincingly that very heavy ions with 2 electrons in the filled K-shell may be accelerated with negligible loss in the AGS. 13 refs., 3 figs., 3 tabs

  1. Advantages of polarization experiments at RHIC

    International Nuclear Information System (INIS)

    Underwood, D.G.

    1991-01-01

    We point out various spin experiments that could be done if the polarized beam option is pursued at RHIC. The advantages of RHIC for investigating several current and future physics problems are discussed. In particular, the gluon spin dependent structure function of the nucleon could be measured cleanly and systematically. Relevant experience developed in conjunction with the Fermilab Polarized Beam program is also presented

  2. Results from STAR experiment at RHIC

    Indian Academy of Sciences (India)

    We present some of the important experimental results from nucleus–nucleus collision studies carried out by the STAR experiment at Relativistic Heavy Ion Collider (RHIC). The results suggests that central Au+Au collisions at RHIC has produced a dense and rapidly thermalizing matter with initial energy densities above the ...

  3. Elastic proton-proton scattering at RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Yip, K.

    2011-09-03

    Here we describe elastic proton+proton (p+p) scattering measurements at RHIC in p+p collisions with a special optics run of {beta}* {approx} 21 m at STAR, at the center-of-mass energy {radical}s = 200 GeV during the last week of the RHIC 2009 run. We present preliminary results of single and double spin asymmetries.

  4. RHIC sextant test: Accelerator systems and performance

    Energy Technology Data Exchange (ETDEWEB)

    Pilat, F.; Trbojevic, D.; Ahrens, L. [and others

    1997-08-01

    One sextant of the RHIC Collider was commissioned in early 1997 with beam. We describe here the performance of the accelerator systems, instrumentation subsystems and application software. We also describe a ramping test without beam that took place after the commissioning with beam. Finally, we analyze the implications of accelerator systems performance and their impact on the planning for RHIC installation and commissioning.

  5. RHIC sextant test: Accelerator systems and performance

    International Nuclear Information System (INIS)

    Pilat, F.; Trbojevic, D.; Ahrens, L.

    1997-01-01

    One sextant of the RHIC Collider was commissioned in early 1997 with beam. We describe here the performance of the accelerator systems, instrumentation subsystems and application software. We also describe a ramping test without beam that took place after the commissioning with beam. Finally, we analyze the implications of accelerator systems performance and their impact on the planning for RHIC installation and commissioning

  6. The color class condensate RHIC and HERA

    CERN Document Server

    McLerran, L

    2002-01-01

    In this talk, I discuss a universal form of matter, the color glass condensate. It is this matter which composes the low x part of all hadronic wavefunctions. The experimental programs at RHIC and HERA, and future programs at LHC and RHIC may allow us to probe and study the properties of this matter. (8 refs).

  7. COMMISSIONING SPIN ROTATORS IN RHIC

    International Nuclear Information System (INIS)

    MACKAY, W.W.; AHRENS, L.; BAI, M.; COURANT, E.D.; FISCHER, W.; HUANG, H.; LUCCIO, A.; MONTAG, C.; PILAT, F.; PTITSYN, V.; ROSER, T.; SATOGATA, T.; TRBOJEVIC, D.; VANZIEJTS, J.

    2003-01-01

    During the summer of 2002, eight superconducting helical spin rotators were installed into RHIC in order to control the polarization directions independently at the STAR and PHENIX experiments. Without the rotators, the orientation of polarization at the interaction points would only be vertical. With four rotators around each of the two experiments, we can rotate either or both beams from vertical into the horizontal plane through the interaction region and then back to vertical on the other side. This allows independent control for each beam with vertical, longitudinal, or radial polarization at the experiment. In this paper, we present results from the first run using the new spin rotators at PHENIX

  8. INTENSITY DEPENDENT EFFECTS IN RHIC

    International Nuclear Information System (INIS)

    WEI, J.

    1999-01-01

    The Relativistic Heavy Ion Collider (RHIC) is currently under commissioning after a seven-year construction cycle. Unlike conventional hadron colliders, this machine accelerates, stores, and collides heavy ion beams of various combinations of species. The dominant intensity dependent effects are intra-beam scattering at both injection and storage, and complications caused by crossing transition at a slow ramp rate. In this paper, the authors present theoretical formalisms that have been used for the study, and discuss mechanisms, impacts, and compensation methods including beam cooling and transition jump schemes. Effects of space charge, beam-beam, and ring impedances are also summarized

  9. Brookhaven highlights, fiscal year 1985, October 1, 1984-September 30, 1985

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    Activities at Brookhaven National Laboratory are briefly discussed. These include work at the National Synchrotron Light Source, the High Flux Beam Reactor, and the Alternating Gradient Synchrotron. Areas of research include heavy ion reactions, neutrino oscillations, low-level waste, nuclear data, medicine, biology, chemistry, parallel computing, optics. Also provided are general and administrative news, a financial report. (LEW)

  10. Brookhaven highlights, fiscal year 1985, October 1, 1984-September 30, 1985

    International Nuclear Information System (INIS)

    1985-01-01

    Activities at Brookhaven National Laboratory are briefly discussed. These include work at the National Synchrotron Light Source, the High Flux Beam Reactor, and the Alternating Gradient Synchrotron. Areas of research include heavy ion reactions, neutrino oscillations, low-level waste, nuclear data, medicine, biology, chemistry, parallel computing, optics. Also provided are general and administrative news, a financial report

  11. MWPC data acquisition in the Brookhaven FASTBUS

    International Nuclear Information System (INIS)

    Black, J.K.; Blatt, S.R.; Campbell, M.C.

    1983-01-01

    For Brookhaven AGS Experiment No. 749, a data acquisition system to accommodate 12, 256 wire multiwire proportional chambers (MWPCs) has been built in the context of the Brookhaven FASTBUS. Information about wires hit or continuous clusters of wires hit is encoded as the centroids of the clusters and number of wires in those clusters. The encoded information is stored in a stack memory in a FASTBUS module where it can be accessed by a FASTBUS Master. Encoding time is less than 4 microseconds. Also, information (in the form of front panel outputs) as to the nature of the data is available in less than 200 nanoseconds

  12. RHIC beam position monitor assemblies

    International Nuclear Information System (INIS)

    Cameron, P.R.; Grau, M.C.; Ryan, W.A.; Shea, T.J.; Sikora, R.E.

    1993-01-01

    Design calculations, design details, and fabrication techniques for the RHIC BPM Assemblies are discussed. The 69 mm aperture single plane detectors are 23 cm long short-circuited 50 ohm strip transmission lines subtending 80 degrees. They are mounted on the sextupole end of the Corrector-Quadrupole-Sextupole package and operate at liquid helium temperature. The 69 cm aperture was selected to be the same as that of the beampipe in the CQS package, the 23 cm length is a compromise between mechanical stability and electrical sensitivity to the long low-intensity proton and heavy ion bunches to be found in RHIC during commissioning, and the 80 degree subtended angle maximizes linear aperture. The striplines are aligned after brazing to maintain electrical-to-mechanical centers within 0.1 mm radius, eliminating the need for individual calibration. Because the cryogenic feedthrus isolate the UHV beam vacuum only from the HV insulating vacuum, and do not see liquid helium, a replaceable mini-ConFlat design was chosen to simplify fabrication, calibration, and maintenance

  13. RHIC Beam Position Monitor Assemblies

    International Nuclear Information System (INIS)

    Cameron, P.R.; Grau, M.C.; Ryan, W.A.; Shea, T.J.; Sikora, R.E.

    1993-01-01

    Design calculations, design details, and fabrication techniques for the RHIC BPM Assemblies are discussed. The 69 mm aperture single plane detectors are 23 cm long short-circuited 50 ohm strip transmission lines subtending 80 degrees. They are mounted on the sextupole end of the Corrector-Quadrupole-Sextupole package and operate at liquid helium temperature. The 69 cm aperture was selected to be the same as that of the beampipe in the CQS package, dc 23 cm length is a compromise between mechanical stability and electrical sensitivity to the long low-intensity proton and heavy ion bunches to be found in RHIC during commissioning, and the 80 degree subtended angle maximizes linear aperture. The striplines are aligned after brazing to maintain electrical-to-mechanical centers within 0.1 mm radius, eliminating the need for individual calibration. Because the cryogenic feedthrus isolate the UHV beam vacuum only from the HV insulating vacuum, and do not see liquid helium, a replaceable mini-ConFlat design was chosen to simplify fabrication, calibration, and maintenance

  14. THE RELATIVISTIC HEAVY ION COLLIDER (RHIC) CRYOGENIC SYSTEM AT BNL: REVIEW OF THE MODIFICATIONS AND UPGRADES SINCE 2002 AND PLANNED IMPROVEMENTS

    International Nuclear Information System (INIS)

    THAN, Y.R.; TUOZZOLO, J.; SIDI-YAKHLEF, A.; GANNI, V.; KNUDSEN, P.; ARENIUS, D.

    2007-01-01

    Brookhaven National Laboratory continues its multi-year program to improve the operational efficiency, reliability, and stability of the cryogenic system which also resulted in improved beam availability of the Relativistic Heavy Ion Collider (RHIC). This paper summarizes the work and changes made after each phase over the past four years to the present, as well as proposed future improvements. Power usage dropped from an initial 9.4 MW to the present 5.1 MW and is expected to drop below 5 MW after the completion of the remaining proposed improvements. The work proceeded in phases by balancing the Collider's schedule of operation, time required for the modifications and budget constraints. The main changes include process control, compressor oil removal and management, elimination of the use of cold compressors and two liquid helium storage tanks, insulation of the third liquid helium storage tank, compressor bypass flow reduction and the addition of a load turbine (Joule-Thompson expander) with associated heat exchangers at the cold end of the plant. Also, liquid helium pumps used for forced circulation of the sub-cooled helium through the magnet loops were eliminated by an accelerator supply flow reconfiguration. Planned future upgrades include the resizing of expanders 5 and 6 to increase their efficiencies

  15. BROOKHAVEN: Spin rotator to boost polarization

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The Alternating Gradient Synchrotron (AGS) at Brookhaven holds the world record energy for spin polarized proton beams at 22 GeV. However this required a complicated two-week commissioning effort to overcome 39 imperfection depolarizing resonances and six intrinsic depolarizing resonances

  16. Video Games - Did They Begin at Brookhaven

    Science.gov (United States)

    dropdown arrow Site Map A-Z Index Menu Synopsis Video Games – Did They Begin at Brookhaven? Additional Web program led to the pioneering development of video games. William Higinbotham William Higinbotham First Pong, now Space Invaders, next Star Castle – video games have mesmerized children of at all ages

  17. HIGH PT MEASUREMENT AT RHIC

    International Nuclear Information System (INIS)

    MIODUSZEWSKI, S.

    2003-01-01

    We present recent high transverse momentum measurements in Au+Au and p+p collisions at the Relativistic Heavy Ion Collider (RHIC). We define and show the nuclear modification factor for neutral pions and charged hadrons and discuss the particle species dependence. By means of the nuclear modification factor, we observe a suppression factor at high p T of 5-6 for neutral pions and 3-4 for charged hadrons in central Au+Au collisions relative to the binary-scaled yields in p+p (or peripheral) collisions. Finally we present strong evidence for the observation of jets in Au+Au collisions and the disappearance of the away-side jet in central Au+Au collisions

  18. RHIC heavy ion operations performance

    CERN Document Server

    Satogata, T; Ferrone, R; Pilat, F

    2006-01-01

    The Relativistic Heavy Ion Collider (RHIC) completed its fifth year of operation in 2005, colliding copper ion beams with ps=200 GeV/u and 62.4 GeV/u[1]. Previous heavy ion runs have collided gold ions at ps=130 GeV/u, 200 GeV/u, and 62.4 GeV/u[2], and deuterons and gold ions at ps=200 GeV/u[3]. This paper discusses operational performance statistics of this facility, including Cu- Cu delivered luminosity, availability, calendar time spent in physics stores, and time between physics stores. We summarize the major factors affecting operations efficiency, and characterize machine activities between physics stores.

  19. ABORT GAP CLEANING IN RHIC

    International Nuclear Information System (INIS)

    DREES, A.; AHRENS, L.; III FLILLER, R.; GASSNER, D.; MCINTYRE, G.T.; MICHNOFF, R.; TRBOJEVIC, D.

    2002-01-01

    During the RHIC Au-run in 2001 the 200 MHz storage cavity system was used for the first time. The rebucketing procedure caused significant beam debunching in addition to amplifying debunching due to other mechanisms. At the end of a four hour store, debunched beam could account for approximately 30%-40% of the total beam intensity. Some of it will be in the abort gap. In order to minimize the risk of magnet quenching due to uncontrolled beam losses at the time of a beam dump, a combination of a fast transverse kicker and copper collimators were used to clean the abort gap. This report gives an overview of the gap cleaning procedure and the achieved performance

  20. Enhanced dilepton radiation at RHIC

    CERN Document Server

    Toia, Alberica

    2009-01-01

    Recently, there is growing evidence that a new state of matter is formed in Au+Au collisions at RHIC: a strongly coupled Quark Gluon Plasma of partonic degrees of freedom which develops a collective motion. Dilepton spectra are not affected by strong interaction and can therefore probe the whole time evolution of the collision. Thus they may be sensitive to the onset of deconfinement, chiral symmetry restoration, as well as the production of thermal photons. The PHENIX experiment measured the production of e+e− pairs in p+p and Au+Au collisions at . An enhanced dilepton yield in the mass range is measured. The excess increases faster with centrality than the number of participating nucleons, and is concentrated at . At higher pT the excess below 300 MeV/c2 has been related to an enhanced production of direct photons, possibly of thermal origin.

  1. Experts dismiss doomsday scenarios for RHIC

    CERN Multimedia

    Levi, B G

    2000-01-01

    A panel of particle physicists examining the possibility that operation of RHIC could generate blackholes or 'strangelets' which would consume ordinary matter, have declared that such scenarios are 'firmly excluded' (1 p).

  2. Advantages of polarization experiments at RHIC

    International Nuclear Information System (INIS)

    Underwood, D.G.

    1990-01-01

    We point out various spin experiments that could be done if the polarized beam option is pursued at RHIC. The advantages of RHIC for investigating several current and future physics problems are discussed. In particular, the gluon spin dependent structure function of the nucleon could be measured cleanly and systematically. Relevant experience developed in conjunction with the Fermilab Polarized Beam program is also presented. 8 refs., 2 tabs

  3. Chasing the unicorn: RHIC and the QGP

    International Nuclear Information System (INIS)

    Pisarski, Robert D.; Niels Bohr Institute, Copenhagen; J. W. Goethe Univ., Frankfurt

    2006-01-01

    At nonzero temperature, it is expected that QCD undergoes a phase transition to a deconfined, chirally symmetric phase, the Quark-Gluon Plasma (QGP). I review what we expect theoretically about this possible transition, and what we have learned from heavy ion experiments at RHIC. I argue that while there are unambiguous signals for qualitatively new behavior at RHIC, versus experiments at lower energies, that in detail, no simple theoretical model can explain all salient features of the data. (author)

  4. A NEW RELATIVE PROTON POLARIMETER FOR RHIC

    International Nuclear Information System (INIS)

    HUANG, H.; ALEKSEEV, I.; BUNCE, G.; BRUNER, N.; DESHPANDE, A.; GOTO, Y.; FIELDS, D.; IMAI, K.

    2001-01-01

    An innovative polarimeter based on proton carbon elastic scattering in the Coulomb Nuclear Interference (CNI) region has been installed and commissioned in the Blue ring of RHIC during the first RHIC polarized proton commissioning in September, 2000. The polarimeter consists of ultra-thin carbon targets and four silicon detectors. All elements are in a 1.6 meter vacuum chamber. This paper summarizes the polarimeter design issues and recent commissioning results

  5. Chasing the unicorn: RHIC and the QGP

    Energy Technology Data Exchange (ETDEWEB)

    Pisarski, Robert D. [Brookhaven National Lab., Upton, NY (United States). Nuclear Theory and High Energy Theory Nuclear Theory Groups; Niels Bohr Institute, Copenhagen (Denmark); J. W. Goethe Univ., Frankfurt (Germany). Frankfurt Institute for Advanced Study

    2006-03-15

    At nonzero temperature, it is expected that QCD undergoes a phase transition to a deconfined, chirally symmetric phase, the Quark-Gluon Plasma (QGP). I review what we expect theoretically about this possible transition, and what we have learned from heavy ion experiments at RHIC. I argue that while there are unambiguous signals for qualitatively new behavior at RHIC, versus experiments at lower energies, that in detail, no simple theoretical model can explain all salient features of the data. (author)

  6. COMMISSIONING CNI PROTON POLARIMETERS IN RHIC

    International Nuclear Information System (INIS)

    HUANG, H.; BRAVAR, A.; LI, Z.; MACKAY, W.W.; MAKDISI, Y.; RESCIA, S.; ROSER, T.; SURROW, B.; BUNCE, G.; DESHPANDE, A.; GOTO, Y.; ET AL

    2002-01-01

    Two polarimeters based on proton carbon elastic scattering in the Coulomb Nuclear Interference (CNI) region have been installed and commissioned in the Blue and Yellow rings of RHIC during the first RHIC polarized proton collider run. Each polarimeter consists of ultra-thin carbon targets and six silicon detectors. With newly developed wave form digitizers, they provide fast and reliable polarization information for both rings

  7. Constraining Anomaly Mediated Supersymmetry Breaking Framework via Ongoing Muon g-2 Experiment at Brookhaven

    CERN Document Server

    Chattopadhyay, U; Roy, S; PH; Chattopadhyay, Utpal; Ghosh, Dilip Kumar; Roy, Sourov

    2000-01-01

    The ongoing high precision E821 Brookhaven National Laboratory experiment on muon g-2 is promising to probe a theory involving supersymmetry. We have studied the constraints on minimal Anomaly Mediated Supersymmetry Breaking (AMSB) model using the current data of muon g-2 from Brookhaven. A scenario of seeing no deviation from the Standard Model is also considered, within $2\\sigma$ limit of the combined error from the Standard Model result and the Brookhaven predicted uncertainty level. The resulting constraint is found to be complementary to what one obtains from $b \\to s+ \\gamma$ bounds within the AMSB scenario, since only a definite sign of $\\mu$ is effectively probed via $b \\to s+ \\gamma$. A few relevant generic features of the model are also described for disallowed regions of the parameter space.

  8. From nuclei to hypernuclei: A retrospective view of medium energy physics at Brookhaven

    International Nuclear Information System (INIS)

    Chrien, R.E.

    2000-01-01

    A new frontier in physics originated with programs at two Brookhaven National Laboratory facilities--the Cosmotron and the Alternating Gradient Synchrotron. The development of this frontier over a half century is described, as it turned from conventional nuclear physics to the hypernuclei and the study of strange matter

  9. Brookhaven Lab physicist William Willis wins the 2003 W.K.H. Panofsky prize

    CERN Multimedia

    2003-01-01

    William Willis, a senior physicist Brookhaven National Laboratory, has won the American Physical Society's 2003 W.K.H. Panofsky Prize in Experimental Particle Physics. He received the prize, which consists of $5,000 and a certificate citing his contributions to physics, at the APS meeting in Philadelphia on April 6 (1 page).

  10. Extraction of the high transverse momentum photons in proton + proton collisions at 200 GeV in the PHENIX experiment at RHIC; Isolation des photons de grande impulsion transverse dans les collisions proton+proton a 200 GeV dans l'experience PHENIX au RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Hadl Henni, Ahmed [Ecole doctorale STIM, Sciences et Technologies de l' Information et des Materiaux, Ecole Centrale de Nantes, Universite de Nantes, Ecole des Mines de Nantes, 1 rue de la Noe, BP 92101, 44321 Nantes Cedex 3 (France)

    2007-02-15

    Ultra-relativistic heavy ions collisions allow to reach a hot and dense matter. This new state, called Quarks and Gluons Plasma (QGP), would exist at the first moment of our universe according to the Big Bang theory. The PHENIX experiment, one of the interaction point of the RHIC collider at Brookhaven National Laboratory (USA), aims to study the QGP's signatures. Photons don't interact strongly with the matter and so are an accurate tool to explore the phase of QGP. Moreover photons are emitted during all the phases of the nuclear collision: from the initial state to the final hadronization. We will present a direct photon, produced by hard scattering process in the beginning of the collision, identification method (SICA, Spectroscopic Isolation Cut Analysis) applied on p + p collisions at 200 GeV. This method allows for a better discrimination between direct photons and the other contribution (mainly the electromagnetic decay of the neutral pion). One could find in this thesis the direct photon rate production obtained by SICA and compared to other analysis. With the p + p collisions we have an important reference for the more heavier collisions (Au + Au) where we assume the QGP formation. (author)

  11. The Brookhaven electron analogue, 1953--1957

    Energy Technology Data Exchange (ETDEWEB)

    Plotkin, M.

    1991-12-18

    The following topics are discussed on the Brookhaven electron analogue: L.J. Haworth and E.L. VanHorn letters; Original G.K. Green outline for report; General description; Parameter list; Mechanical Assembly; Alignment; Degaussing; Vacuum System; Injection System; The pulsed inflector; RF System; Ferrite Cavity; Pick-up electrodes and preamplifiers; Radio Frequency power amplifier; Lens supply; Controls and Power; and RF acceleration summary.

  12. Searching for the H dibaryon at Brookhaven

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, A.J. [Princeton Univ., NJ (United States)

    1994-12-01

    This paper reviews the status of current experiments at Brookhaven, searching for the six-quark H dibaryon postulated by R. Jaffe in 1977. Two experiments, E813 and E888, have recently completed running and two new experiments, E836 and E885, are approved to run. The data recorded so far is under analysis and should have good sensitivity to both short-lived and long-lived Hs.

  13. The Brookhaven electron analogue, 1953--1957

    International Nuclear Information System (INIS)

    Plotkin, M.

    1991-01-01

    The following topics are discussed on the Brookhaven electron analogue: L.J. Haworth and E.L. VanHorn letters; Original G.K. Green outline for report; General description; Parameter list; Mechanical Assembly; Alignment; Degaussing; Vacuum System; Injection System; The pulsed inflector; RF System; Ferrite Cavity; Pick-up electrodes and preamplifiers; Radio Frequency power amplifier; Lens supply; Controls and Power; and RF acceleration summary

  14. Closed orbit analysis for RHIC

    International Nuclear Information System (INIS)

    Milutinovic, J.; Ruggiero, A.G.

    1989-01-01

    We examine the effects of four types of errors in the RHIC dipoles and quadrupoles on the on-momentum closed orbit in the machine. We use PATRIS both to handle statistically the effects of kick-modeled errors and to check the performance of the Fermilab correcting scheme in a framework of a more realistic modeling. On the basis of the accepted rms values of the lattice errors, we conclude that in about 40% of all studied cases the lattice must be to some extent pre-corrected in the framework of the so-called ''first turn around strategy,'' in order to get a closed orbit within the aperture limitations at all and, furthermore, for approximately 2/3 of the remaining cases we find that a single pass algorithm of the Fermilab scheme is not sufficient to bring closed orbit distortions down to acceptable levels. We have modified the scheme and have allowed repeated applications of the otherwise unchanged three bump method and in doing so we have been able to correct the orbit in a satisfactory manner. 4 refs., 2 figs., 3 tabs

  15. Status of the RHIC and BNL/CERN heavy ion programs

    International Nuclear Information System (INIS)

    Ozaki, S.

    1993-01-01

    With the gold beam operation at the Brookhaven AGS started in 1992, and with the lead beam operation at the CERN SPS planned for 1994--1995, investigation of high nucleon density states through high energy heavy ion collisions is becoming a reality. In addition, the Relativistic Heavy Ion Collider (RHIC) at BNL, which is dedicated to the study of ultra-high energy heavy ion collisions, is under construction with a target completion date in 1997. There also is a plan to run the proposed CERN LHC for a few months a year for the heavy ion program. These colliders should provide opportunities to extend our knowledge of nuclear matter to the extraordinary states of extreme high temperature and high density, thus opening the way to the creation and study of quark-gluon plasma. The lattice gauge calculation based on the theory of strong interactions (QCD) predicts that, at such states, quarks and gluons are deconfined from individual nucleons and form a hot plasma. In this paper, the status of heavy ion stationary target programs at the BNL AGS and the CERN SPS, the progress of RHIC construction, and heavy ion research potential at LHC will be presented. The status of the CERN LHC will be covered elsewhere in these Proceedings

  16. Estimation of collective instabilities in RHIC

    International Nuclear Information System (INIS)

    MacKay, W.W.; Blaskiewicz, M.; Deng, D.; Mane, V.; Peggs, S.; Ratti, A.; Rose, J.; Shea, T.J.; Wei, J.

    1995-01-01

    The authors have estimated the broadband impedance in RHIC to be |Z/n| +79 ions at transition with an estimated 10% growth in emittance for Z/n = 1.5 Ω. They summarize the sources of broad and narrow band impedances in RHIC and investigate the multibunch instability limits throughout the machine cycle. The largest contribution to the broadband impedance comes from the abort and injection kickers. Since RHIC is designed to accelerate fully stripped ions from H + up to Au +79 they give results for both protons and gold ions; other ions should give results somewhere between these two extremes. All ion species are expected to be stable during storage. At lower energies damping systems and chromaticity corrections will limit any growth to acceptable levels during the short time it takes to inject and accelerate the beams

  17. RHIC Beam Loss Monitor System Initial Operation

    International Nuclear Information System (INIS)

    Witkover, R. L.; Michnoff, R. J.; Geller, J. M.

    1999-01-01

    The RHIC Beam Loss Monitor (BLM) System is designed to prevent beam loss quenching of the superconducting magnets, and acquire loss data. Four hundred ion chambers are located around the rings to detect losses. The required 8-decade range in signal current is compressed using an RC pre-integrator ahead of a low current amplifier. A beam abort may be triggered if fast or slow losses exceed programmable threshold levels. A micro-controller based VME module sets references and gains and reads trip status for up to 64 channels. Results obtained with the detectors in the RHIC Sextant Test and the prototype electronics in the AGS-to-RHIC (AtR) transfer line are presented along with the present status of the system

  18. RHIC BPM System Modifications and Performance

    CERN Document Server

    Satogata, Todd; Cameron, Peter; Cerniglia, Phil; Cupolo, John; Curcio, Anthony J; Dawson, William C; Degen, Christopher; Gullotta, Justin; Mead, Joe; Michnoff, Robert; Russo, Thomas; Sikora, Robert

    2005-01-01

    The RHIC beam position monitor (BPM) system provides independent average orbit and turn-by-turn (TBT) position measurements. In each ring, there are 162 measurement locations per plane (horizontal and vertical) for a total of 648 BPM planes in the RHIC machine. During 2003 and 2004 shutdowns, BPM processing electronics were moved from the RHIC tunnel to controls alcoves to reduce radiation impact, and the analog signal paths of several dozen modules were modified to eliminate gain-switching relays and improve signal stability. This paper presents results of improved system performance, including stability for interaction region and sextupole beam-based alignment efforts. We also summarize performance of improved million-turn TBT acquisition channels for nonlinear dynamics and echo studies.

  19. Implementation of Ramp Control in RHIC

    International Nuclear Information System (INIS)

    Kewisch, J.

    1999-01-01

    After the injection of beam into RHIC the beam energy is ramped from 10.8 GeV/u to 108 GeV/u and the beta function of the interaction points is reduced from 10 meters to 1 meter. The set points for magnet power supplies and RF cavities is changed during such ramps in concert. A system of Wave Form Generators (WFGs), interconnected by a Real Time Data Link (RTDL) and Event Link is used to control these devices. RHIC ramps use a two level system of WFGs: one transmits the beam energy and a ''pseudo time'' variable as functions of time via RTDL; the other calculates the device set points as functions of these RTDL variables. Energy scaling, saturation correction and the wiring of interaction region quadruples is performed on the second level. This report describes the configuration and implementation of the software, firmware and hardware of the RHIC ramp system

  20. Beam Induced Pressure Rise at RHIC

    CERN Document Server

    Zhang, S Y; Bai, Mei; Blaskiewicz, Michael; Cameron, Peter; Drees, Angelika; Fischer, Wolfram; Gullotta, Justin; He, Ping; Hseuh Hsiao Chaun; Huang, Haixin; Iriso, Ubaldo; Lee, Roger C; Litvinenko, Vladimir N; MacKay, William W; Nicoletti, Tony; Oerter, Brian; Peggs, Steve; Pilat, Fulvia Caterina; Ptitsyn, Vadim; Roser, Thomas; Satogata, Todd; Smart, Loralie; Snydstrup, Louis; Thieberger, Peter; Trbojevic, Dejan; Wang, Lanfa; Wei, Jie; Zeno, Keith

    2005-01-01

    Beam induced pressure rise in RHIC warm sections is currently one of the machine intensity and luminosity limits. This pressure rise is mainly due to electron cloud effects. The RHIC warm section electron cloud is associated with longer bunch spacings compared with other machines, and is distributed non-uniformly around the ring. In addition to the countermeasures for normal electron cloud, such as the NEG coated pipe, solenoids, beam scrubbing, bunch gaps, and larger bunch spacing, other studies and beam tests toward the understanding and counteracting RHIC warm electron cloud are of interest. These include the ion desorption studies and the test of anti-grazing ridges. For high bunch intensities and the shortest bunch spacings, pressure rises at certain locations in the cryogenic region have been observed during the past two runs. Beam studies are planned for the current 2005 run and the results will be reported.

  1. The RHIC real time data link system

    International Nuclear Information System (INIS)

    Hartmann, H.

    1997-01-01

    The RHIC Real Time Data Link (RTDL) System distributes to all locations around the RHIC ring machine parameters of general interest to accelerator systems and users. The system, along with supporting host interface, is centrally located. The RTDL System is comprised of two module types: the Encoder Module (V105) and the Input Module (V106). There is only one V105 module, but many (up to 128) Input Modules. Multiple buffered outputs are provided for use locally or for retransmission to other RHIC equipment locations. Machine parameters are generated from the V115 Waveform Generator Module (WFG) or from machine hardware and coupled directly through a fiber optic serial link to one of the V106 input channels

  2. Design, construction, system integration, and test results of the 1 MW CW RF system for the e-gun cavity in the energy recovery LINAC at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Lenci, S.J.; Eisen, E.L.; Dickey, D.L.; Sainz, J.E.; Utay, P.F.; Zaltsman, A.; Lambiase, R.

    2009-01-01

    Brookhaven's ERL (Energy Recovery LINAC) requires a 1 MW CW RF system for the superconducting electron gun cavity. The system consists primarily of a klystron tube, transmitter, and High-Voltage Power Supply (HVPS). The 703.75 MHz klystron made by CPl, Inc. provides RF power of 1MW CW with efficiency of 65%. It has a single output window, diode-type electron gun, and collector capable of dissipating the entire beam power. It was fully factory tested including 24-hour heat run at 1.1 MW CWo The solid state HVPS designed by Continental Electronics provides up to 100 kV at low ripple and 2.1 MW CW with over 95% efficiency. With minimal stored energy and a fast shut-down mode no crowbar circuit is needed. Continental 's transmitter includes PLC based user interface and monitoring, RF pre-amplifier, magnet and Vac-Ion pump supplies, cooling water instrumentation, and integral safety interlock system. BNL installed the klystron, HVPS, and transmitter along with other items, such as circulator, water load, and waveguide components. The collaboration of BNL, CPI, and Continental in the design, installation, and testing was essential to the successful operation of the 1MW system

  3. Experience with split transition lattices at RHIC

    International Nuclear Information System (INIS)

    Montag, C.; Tepikian, S.; Blaskiewicz, M.; Brennan, J.M.

    2010-01-01

    During the acceleration process, heavy ion beams in RHIC cross the transition energy. When RHIC was colliding deuterons and gold ions during Run-8, lattices with different integer tunes were used for the two rings. This resulted in the two rings crossing transition at different times, which proved beneficial for the 'Yellow' ring, the RF system of which is slaved to the 'Blue' ring. For the symmetric gold-gold run in FY2010, lattices with different transition energies but equal tunes were implemented. We report the optics design concept as well as operational experience with this configuration.

  4. Heavy nuclei, from RHIC to the cosmos

    International Nuclear Information System (INIS)

    Klein, Spencer R.

    2003-01-01

    Ultra-relativistic heavy ion collisions produce a high-temperature, thermalized system that may mimic the conditions present shortly after the big bang. This writeup will given an overview of early results from the Relativistic Heavy Ion Collider (RHIC), and discuss what we have learned about hot, strongly interacting nuclear systems. The thermal and chemical composition of the system will be discussed, along with observables that are sensitive to the early evolution of the system. I will also discuss the implications of the RHIC results for cosmic ray air showers

  5. A prototype ionization profile monitor for RHIC

    International Nuclear Information System (INIS)

    Connolly, R.; Cameron, P.; Ryan, W.

    1997-01-01

    Transverse beam profiles in the Relativistic Heavy-Ion Collider (RHIC) will be measured with ionization profile monitors (IPM's). Each IPM collects and measures the distribution of electrons in the beamline resulting from residual gas ionization during bunch passage. The electrons are swept transversely from the beamline and collected on strip anodes oriented parallel to the beam axis. At each bunch passage the charge pulses are amplified, integrated, and digitized for display as a profile histogram. A prototype detector was tested in the injection line during the RHIC Sextant Test. This paper describes the detector and gives results from the beam tests

  6. ACCELERATION OF POLARIZED PROTONS AT RHIC

    International Nuclear Information System (INIS)

    HUANG, H.

    2002-01-01

    Relativistic Heavy Ion Collider (RHIC) ended its second year of operation in January 2002 with five weeks of polarized proton collisions. Polarized protons were successfully injected in both RHIC rings and maintained polarization during acceleration up to 100 GeV per ring using two Siberian snakes in each ring. This is the first time that polarized protons have been accelerated to 100 GeV. The machine performance and accomplishments during the polarized proton run will be reviewed. The plans for the next polarized proton run will be outlined

  7. The RHIC transfer line cable database

    International Nuclear Information System (INIS)

    Scholl, E.H.; Satogata, T.

    1995-01-01

    A cable database was created to facilitate and document installation of cables and wiring in the RHIC project, as well as to provide a data source to track possible wiring and signal problems. The eight tables of this relational database, currently implemented in Sybase, contain information ranging from cable routing to attenuation of individual wires. This database was created in a hierarchical scheme under the assumption that cables contain wires -- each instance of a cable has one to many wires associated with it. This scheme allows entry of information pertinent to individual wires while only requiring single entries for each cable. Relationships to other RHIC databases are also discussed

  8. Summary of the RHIC Retreat 2008

    Energy Technology Data Exchange (ETDEWEB)

    Pilat,F.; Brennan, M.; Brown, K.; Fischer, W.; Montag, C.

    2008-08-01

    The main goal of the RHIC Retreat is to review last run's performance and prepare for the next. As always though we also discussed the longer term goals and plans for the facility to put the work in perspective and in the right priority. A straw-man plan for the facility was prepared for the DOE that assumes 30 cryoweek and running 2 species per year. The plan outlines RHIC operations for 2008-2012 and integrates well accelerator and detector upgrades to optimize the physics output with high luminosities. The plans includes guidance from the PAC and has been reviewed by DOE.

  9. Global Decoupling on the RHIC Ramp

    CERN Document Server

    Luo, Yun; Della Penna, Al; Fischer, Wolfram; Laster, Jonathan S; Marusic, Al; Pilat, Fulvia Caterina; Roser, Thomas; Trbojevic, Dejan

    2005-01-01

    The global betatron decoupling on the ramp is an important issue for the operation of the Relativistic Heavy Ion Collider (RHIC). In the polarized proton run, the betatron tunes are required to keep almost constant on the ramp to avoid spin resonance line crossing and the beam polarization loss. Some possible correction schemes on the ramp, like three-ramp correction, the coupling amplitude modulation and the coupling phase modulaxtion, have been found. The principles of these schemes are shortly reviewed and compared. Operational results of their applications on the RHIC ramps are given.

  10. Summary of the RHIC Retreat 2008

    International Nuclear Information System (INIS)

    Pilat, F.; Brennan, M.; Brown, K.; Fischer, W.; Montag, C.

    2008-01-01

    The main goal of the RHIC Retreat is to review last run's performance and prepare for the next. As always though we also discussed the longer term goals and plans for the facility to put the work in perspective and in the right priority. A straw-man plan for the facility was prepared for the DOE that assumes 30 cryoweek and running 2 species per year. The plan outlines RHIC operations for 2008-2012 and integrates well accelerator and detector upgrades to optimize the physics output with high luminosities. The plans includes guidance from the PAC and has been reviewed by DOE

  11. Dilepton Production at Fermilab and RHIC

    International Nuclear Information System (INIS)

    Peng, J.C.; McGaughey, P.L.; Moss, J.M.

    1999-01-01

    Some recent results from several fixed-target dimuon production experiments at Fermilab are presented. In particular, we discuss the use of Drell-Yan data to determine the flavor structure of the nucleon sea, as well as to deduce the energy-loss of partons traversing nuclear medium. Future dilepton experiments at RHIC could shed more light on the flavor asymmetry and possible charge-symmetry-violation of the nucleon sea. Clear evidence for scaling violation in the Drell-Yan process could also be revealed at RHIC

  12. RHIC ABORT KICKER WITH REDUCED COUPLING IMPEDANCE

    International Nuclear Information System (INIS)

    HAHN, H.; DAVINO, D.

    2002-01-01

    Kicker magnets typically represent the most important contributors to the transverse impedance budget of accelerators and storage rings. Methods of reducing the impedance value of the SNS extraction kicker presently under construction and, in view of a future performance upgrade, that of the RHIC abort kicker have been thoroughly studied at this laboratory. In this paper, the investigation of a potential improvement from using ferrite different from the BNL standard CMD5005 is reported. Permeability measurements of several ferrite types have been performed. Measurements on two kicker magnets using CMD5005 and C2050 suggest that the impedance of a magnet without external resistive damping, such as the RHIC abort kicker, would benefit

  13. PROPOSAL FOR AN EBIS BASED RHIC PREINJECTOR.

    Energy Technology Data Exchange (ETDEWEB)

    ALESSI,J.G.; BEEBE,E.; KPONOU,A.; PIKIN,A.; PRELEC,K.; RAPARIA,D.; RITTER,J.; ZHANG,S.Y.

    2000-11-06

    A proposed new heavy ion preinjector for RHIC is described. The progress made at BNL on the development of an Electron Beam Ion Source (EBIS) has increased our confidence that one can build a preinjector meeting RHIC requirements using an EBIS producing intermediate charge state heavy ions. A new RFQ and Linac will be required to accelerate beams from this source to an energy sufficient for injection into the AGS Booster. These are both straightforward devices, very similar to ones already in operation at other laboratories. Injection into the Booster will occur at the same location as the existing heavy ion injection from the Tandem Van de Graaff.

  14. SIMULATION OF PARTICLE SPECTRA AT RHIC

    International Nuclear Information System (INIS)

    KAHANA, D.E.; KAHANA, S.H.

    2001-01-01

    A purely hadronic simulation is performed of the recently reported data from PHOBOS at energies of √s = 56, 130 GeV using the relativistic heavy ion cascade LUCIFER which had previously given a good description of the NA49 inclusive spectra at √s = 17.2 GeV/A. The results compare well with these early measurements at RHIC and indeed successfully predict the increase in multiplicity now seen by PHOBOS and the other RHIC detectors at the nominal maximum energy of √s = 200 GeV/A, suggesting that evidence for quark-gluon matter remains elusive

  15. A prototype ionization profile monitor for RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Connolly, R.; Cameron, P.; Ryan, W. [and others

    1997-07-01

    Transverse beam profiles in the Relativistic Heavy-Ion Collider (RHIC) will be measured with ionization profile monitors (IPM`s). Each IPM collects and measures the distribution of electrons in the beamline resulting from residual gas ionization during bunch passage. The electrons are swept transversely from the beamline and collected on strip anodes oriented parallel to the beam axis. At each bunch passage the charge pulses are amplified, integrated, and digitized for display as a profile histogram. A prototype detector was tested in the injection line during the RHIC Sextant Test. This paper describes the detector and gives results from the beam tests.

  16. Polarized proton acceleration at the Brookhaven AGS

    International Nuclear Information System (INIS)

    Ahrens, L.A.

    1986-01-01

    At the conclusion of polarized proton commissioning in February 1986, protons with an average polarization of 45%, momentum of 21.7 GeV/c, and intensity of 2 x 10 10 protons per pulse, were extracted to an external polarimeter at the Brookhaven AGS. In order to maintain this polarization, five intrinsic and nearly forty imperfection depolarizing resonances had to be corrected. An apparent interaction between imperfection and intrinsic resonances occurring at very nearly the same energy was observed and the correction of imperfection resonances using ''beat'' magnetic harmonics discovered in the previous AGS commissioning run was further confirmed

  17. Performance of the Brookhaven photocathode rf gun

    International Nuclear Information System (INIS)

    Batchelor, K.; Ben-Zvi, I.; Fernow, R.C.; Fischer, J.; Fisher, A.S.; Gallardo, J.; Ingold, G.; Kirk, H.G.; Leung, K.P.; Malone, R.; Pogorelsky, I.; Srinivasan-Rao, T.; Rogers, J.; Tsang, T.; Sheehan, J.; Ulc, S.; Woodle, M.; Xie, J.; Zhang, R.S.; Lin, L.Y.; McDonald, K.T.; Russell, D.P.; Hung, C.M.; Wang, X.J.

    1991-01-01

    The Brookhaven Accelerator Test Facility (ATF) uses a photocathode rf gun to provide a high-brightness electron beam intended for FEL and laser-acceleration experiments. The rf gun consists of 1 1/2 cells driven at 2856 MHz in π-mode with a maximum cathode field of 100 MV/m. To achieve long lifetimes, the photocathode development concentrates on robust metals such as copper, yttrium and samarium. We illuminate these cathodes with a 10-ps, frequency-quadrupled Nd:YAG laser. We describe the initial operation of the gun, including measurements of transverse and longitudinal emittance, quantum efficiencies, and peak current. The results are compared to models

  18. The Relativistic Heavy Ion Collider at Brookhaven

    International Nuclear Information System (INIS)

    Hahn, H.

    1989-01-01

    The conceptual design of a collider capable of accelerating and colliding heavy ions and to be constructed in the existing 3.8 km tunnel at Brookhaven has been developed. The collider has been designed to provide collisions of gold ions at six intersection points with a luminosity of about 2 x 10 26 cm -2 sec -1 at an energy per nucleon of 100 GeV in each beam. Collisions with different ion species, including protons, will be possible. The salient design features and the reasons for major design choices of the proposed machine are discussed in this paper. 28 refs., 2 figs., 1 tab

  19. Iron saturation control in RHIC dipole magnets

    International Nuclear Information System (INIS)

    Thompson, P.A.; Gupta, R.C.; Kahn, S.A.; Hahn, H.; Morgan, G.H.; Wanderer, P.J.; Willen, E.

    1991-01-01

    The Relativistic Heavy Ion Collider (RHIC) will require 360 dipoles of 80 mm bore. This paper discusses the field perturbations produced by the saturation of the yoke iron. Changes have been made to the yoke to reduce these perturbations, in particular, decapole -4 . Measurements and calculations for 6 series of dipole magnets are presented. 2 refs., 2 figs., 1 tab

  20. FIRST POLARIZED PROTON COLLISIONS AT RHIC

    International Nuclear Information System (INIS)

    ROSER, T.; AHRENS, L.; ALESSI, J.; BAI, M.; BEEBE-WANG, J.; BRENNAN, J.M.; BROWN, K.A.; BUNCE, G.; CAMERON, P.; COURANT, E.D.; DREES, A.; FISCHER, W.; FLILLER, R. III; GLENN, W.; HUANG, H.; LUCCIO, A.U.; MACKAY, W.W.; MAKDISI, Y.; MONTAG, C.; PILAT, F.; PTITSYN, V.; SATOGATA, T.

    2002-01-01

    We successfully injected polarized protons in both RHIC rings and maintained polarization during acceleration up to 100 GeV per ring using two Siberian snakes in each ring. Each snake consists of four helical superconducting dipoles which rotate the polarization by 180 o about a horizontal axis. This is the first time that polarized protons have been accelerated to 100 GeV

  1. RHIC Proton Luminosity and Polarization Improvement

    International Nuclear Information System (INIS)

    Zhang, S. Y.

    2014-01-01

    The RHIC proton beam polarization can be improved by raising the Booster scraping, which also helps to reduce the RHIC transverse emittance, and therefore to improve the luminosity. By doing this, the beam-beam effect would be enhanced. Currently, the RHIC working point is constrained between 2/3 and 7/10, the 2/3 resonance would affect intensity and luminosity lifetime, and the working point close to 7/10 would enhance polarization decay in store. Run 2013 shows that average polarization decay is merely 1.8% in 8 hours, and most fills have the luminosity lifetime better than 14 hours, which is not a problem. Therefore, even without beam-beam correction, there is room to improve for RHIC polarization and luminosity. The key to push the Booster scraping is to raise the Booster input intensity; for that, two approaches can be used. The first is to extend the LINAC tank 9 pulse width, which has been successfully applied in run 2006. The second is to raise the source temperature, which has been successfully applied in run 2006 and run 2012.

  2. Polarized proton beam for eRHIC

    Energy Technology Data Exchange (ETDEWEB)

    Huang, H. [Brookhaven National Lab. (BNL), Upton, NY (United States); Meot, F. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ptitsyn, V. [Brookhaven National Lab. (BNL), Upton, NY (United States); Roser, T. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-05-03

    RHIC has provided polarized proton collisions from 31 GeV to 255 GeV in the past decade. To preserve polarization through numerous depolarizing resonances through the whole accelerator chain, harmonic orbit correction, partial snakes, horizontal tune jump system and full snakes have been used. In addition, close attentions have been paid to betatron tune control, orbit control and beam line alignment. The polarization of 60% at 255 GeV has been delivered to experiments with 1.8×1011 bunch intensity. For the eRHIC era, the beam brightness has to be maintained to reach the desired luminosity. Since we only have one hadron ring in the eRHIC era, existing spin rotator and snakes can be converted to six snake configuration for one hadron ring. With properly arranged six snakes, the polarization can be maintained at 70% at 250 GeV. This paper summarizes the effort and plan to reach high polarization with small emittance for eRHIC.

  3. A study of RHIC crystal collimation

    International Nuclear Information System (INIS)

    Trbojevic, D.; Harrison, M.; Parker, B.; Thompson, P.; Stevens, A.; Biryukov, V.; Mokhov, N.; Drozhdin, A.

    1998-01-01

    The Relativistic Heavy Ion Collider (RHIC) will experience increasing longitudinal and transverse heavy ion emittances, mostly due to intra-beam scattering (IBS). The experiments in RHIC are expected to not only have reduced luminosities due to IBS but also background caused by beam halo. Primary betatron collimators will be used to remove the large amplitude particles. The efficiency of the primary collimator in RHIC strongly depends on the alignment of the jaws which needs to be within about ten micro-radians for the optimum conditions. As proposed by V. biryukov bent crystals could be used to improve the efficiency of an existing collimation system by installing them upstream of the collimator jaws. Bent crystals have been successfully used in SPS, Protvino and Fermilab for extraction of the beam particles channeled through them. This study examines possible improvements of the primary collimator system for heavy ions at RHIC by use of bent crystals. Bent crystals will reduce the collimator jaws alignment requirement and will increase collimator efficiency thereby reducing detector background

  4. Brahms Experiment at RHIC Day-1 Physics

    International Nuclear Information System (INIS)

    Videbaek, Flemming

    1999-01-01

    The BRAHMS experiment is designed to measure semi-inclusive spectra of charged hadron over a wide range of rapidity. It will yield information on particle production, both at central rapidity and in the baryon rich fragmentation region. The physics plans for measurements in the first year of running at RHIC are discussed

  5. The Linux farm at the RCF

    International Nuclear Information System (INIS)

    Chan, A.W.; Hogue, R.W.; Throwe, T.G.; Yanuklis, T.A.

    2001-01-01

    A description of the Linux Farm at the RHIC Computing Facility (RCF) is presented. The RCF is a dedicated data processing facility for RHIC, which became operational in the summer of 2000 at Brookhaven National Laboratory

  6. A neutronic feasibility study for LEU conversion of the Brookhaven Medical Research Reactor (BMRR).

    Energy Technology Data Exchange (ETDEWEB)

    Hanan, N. A.

    1998-01-14

    A neutronic feasibility study for converting the Brookhaven Medical Research Reactor from HEU to LEU fuel was performed at Argonne National Laboratory in cooperation with Brookhaven National Laboratory. Two possible LEU cores were identified that would provide nearly the same neutron flux and spectrum as the present HEU core at irradiation facilities that are used for Boron Neutron Capture Therapy and for animal research. One core has 17 and the other has 18 LEU MTR-type fuel assemblies with uranium densities of 2.5g U/cm{sup 3} or less in the fuel meat. This LEU fuel is fully-qualified for routine use. Thermal hydraulics and safety analyses need to be performed to complete the feasibility study.

  7. The new Brookhaven $(g-2)_{\\mu}$ experiment

    CERN Document Server

    Hertzog, D W; Bunce, G M; Carey, R M; Cushman, P B; Danby, G T; Debevec, P T; Deng, H; Deninger, W J; Dhawan, S K; Druzhinin, V P; Duong, L; Earle, W; Efstathiadis, E F; Farley, Francis J M; Fedotovich, G V; Giron, S; Gray, F; Grosse-Perdekamp, M; Grossmann, A; Haeberlen, U; Hare, M; Hazen, E S; Hughes, V W; Iwassaki, M; Jungmann, Klaus; Kawall, D; Kawamura, M; Khazin, B I; Kindem, J; Krienen, F; Kronkvist, I J; Larsen, R; Lee, Y Y; Liu, W; Logashenko, I B; McNabb, R; Meng, W; Mi, J L; Miller, J P; Morse, W M; Onderwater, Gerco; Orlov, Yu F; Pai, C; Polly, C; Pretz, J; Prigl, R; zu Putlitz, Gisbert; Redin, S I; Rind, O; Roberts, B L; Ryskulov, N M; Sanders, R; Sedykh, S N; Semertzidis, Y K; Serednyakov, S I; Shatunov, Yu M; Solodov, E P; Sossong, M; Steinmetz, A; Sulak, Lawrence R; Timmermans, C; Trofimov, A V; Urner, D; Warburton, D; Winn, D; Xu, Q; Yamamoto, A; Zimmerman, D

    1999-01-01

    A new assault on the muon's anomalous magnetic moment has begun with a vigorous effort by the Brookhaven E821 collaboration. The present group has refined the design used in a series of successful CERN experiments in order to lower the systematic uncertainties. Consequently it will be possible to take advantage of the greatly increased muon flux provided for at the AGS. Several novel techniques are employed, of which the most significant is a direct muon injection scheme. Upon reaching the goal of the experiment, comparison with theory will offer sensitive teats of both the electroweak corrections and physics beyond the standard model. At the time of this symposium, data from the first engineering run has been analyzed, yielding a result whose precision and value are comparable to those generated by the last CERN effort. (23 refs).

  8. Charm Meson Production in Au-Au Collisions at √ SNN = 200 Gev at Rhic

    Science.gov (United States)

    Vanfossen, Joseph A., Jr.

    This research work is in the field of experimental nuclear physics, more specifically, the analysis of data taken with the Solenoidal Tracker at RHIC (STAR) apparatus at the Relativistic Heavy Ion Collider (RHIC) located at Brookhaven National Laboratory (BNL). There, we accelerate and collide beams of heavy ions (e.g. gold nuclei) at relativistic velocities. The collisions of heavy nuclei in the STAR Experiment compress nuclear matter to high densities, and heat it to extreme temperatures, over one trillion degrees Celsius. Under such conditions, Lattice QCD and other phenomeno- logical models predict a phase transition in nuclear matter, a transition, where quarks and gluons become deconfined, i.e. they freely move throughout the interaction volume and are no longer confined to individual nucleons, forming Quark Gluon Plasma (QGP), a new state of nuclear matter. The study of QGP, its properties and dynamics, will provide a better understanding of QCD, the strong force, and of the history of the early universe. Mesons containing heavy flavor (charm and bottom) quarks can be used in QGP searches. Heavy quarks are produced mainly in the early stages of a collisions via energetic parton-parton interactions; heavy flavor production in QGP or during hadronization is suppressed due to the high masses of the quarks. Heavy quarks can therefore be used to probe the whole evolution of the system and as a calibrated tool to better understand the nature of the early, hot matter formed in the collisions. A key finding by the experiments at RHIC is the anomalously low production of heavy flavor at high transverse momentum values. This was found by measuring the yields of the decay electrons from mesons containing either charm or bottom quarks. These measurements suffer from very large combinatorial backgrounds and conceal the parent's kinematic properties. A suppression of particle production at high transverse momenta is likely caused by their interaction with the hot and

  9. First turn around strategy for RHIC

    International Nuclear Information System (INIS)

    Milutinovic, J.; Ruggiero, A.G.

    1991-01-01

    The authors present a strategy for achieving the so-called first turn around in RHIC. The strategy is based on the same method proposed to correct a distorted closed orbit in RHIC, i.e. on a generalization of the local three-bump method. They found out that the method is very effective in passing the beam through a non-ideal, insufficiently known, machine. The perturbed lattice was generated by the code PATRIS, which was also adapted to control the newly developed software. In ten distributions of errors the software was capable of passing the beam through in 2-3 injection attempts, at full sextupole strength. It was also determined that once the beam makes the first turn around and all the correctors are energized, it stays in the machine for at least several hundred turns

  10. Observations of Snake Resonance in RHIC

    CERN Document Server

    Bai, Mei; Lee, Shyh-Yuan; Lin, Fanglei; MacKay, William; Ptitsyn, Vadim; Roser, Thomas; Tepikian, Steven

    2005-01-01

    Siberian snakes now become essential in the polarized proton acceleration. With proper configuration of Siberian snakes, the spin precession tune of the beam becomes $\\frac{1}{2}$ which avoids all the spin depolarizing resonance. However, the enhancement of the perturbations on the spin motion can still occur when the betatron tune is near some low order fractional numbers, called snake resonances, and the beam can be depolarized when passing through the resonance. The snake resonances have been confirmed in the spin tracking calculations, and observed in RHIC with polarized proton beam. Equipped with two full Siberian snakes in each ring, RHIC provides us a perfect facility for snake resonance studies. This paper presents latest experimental results. New insights are also discussed.

  11. Helical spin rotators and snakes for RHIC

    International Nuclear Information System (INIS)

    Ptitsin, V.I.; Shatunov, Yu.M.; Peggs, S.

    1995-01-01

    The RHIC collider, now under construction at BNL, will have the possibility of polarized proton-proton collisions up to a beam energy of 250 Gev. Polarized proton beams of such high energy can be only obtained with the use of siberian snakes, a special kind of spin rotator that rotates the particle spin by 180 degree around an axis lying in the horizontal plane. Siberian snakes help to preserve the beam polarization while numerous spin depolarizing resonances are crossed, during acceleration. In order to collide longitudinally polarized beams, it is also planned to install spin rotators around two interaction regions. This paper discusses snake and spin rotator designs based on sequences of four helical magnets. The schemes that were chosen to be applied at RHIC are presented

  12. Adjusting the IP $\\beta$ Functions in RHIC

    CERN Document Server

    Wittmer, W; Pilat, F; Ptitsyn, V; Van Zeijts, J

    2004-01-01

    The beta functions at the IP can be adjusted without perturbation of other optics functions via several approaches. In this paper we describe a scheme based on a vector knob, which assigns fixed values to the different tuning quadrupoles and scales them by a common multiplier. The values for the knob vector were calculated for a lattice without any errors using MADX. Previous studies for the LHC [1] have shown that this approach can meet the design goals. A specific feature of the RHIC lattice is the nested power supply system. To cope with the resulting problems a detailed response matrix analysis has been carried out and different sets of knobs were calculated and compared. The knobs were tested at RHIC during the 2004 run and preliminary results are discussed. Simultaneously a new approach to measure the beam sizes of both colliding beams at the IP, based on the tunability provided by the knobs, was developed and tested.

  13. Elliptic flow and incomplete equilibration at RHIC

    CERN Document Server

    Bhalerao, R S; Borghini, N; Ollitrault, Jean Yves

    2005-01-01

    We argue that RHIC data, in particular those on the anisotropic flow coefficients v_2 and v_4, suggest that the matter produced in the early stages of nucleus-nucleus collisions is incompletely thermalized. We interpret the parameter (1/S)(dN/dy), where S is the transverse area of the collision zone and dN/dy the multiplicity density, as an indicator of the number of collisions per particle at the time when elliptic flow is established, and hence as a measure of the degree of equilibration. This number serves as a control parameter which can be varied experimentally by changing the system size, the centrality or the beam energy. We provide predictions for Cu-Cu collisions at RHIC as well as for Pb-Pb collisions at the LHC.

  14. eRHIC ERL modeling in Zgoubi

    International Nuclear Information System (INIS)

    Meot, F.; Brooks, S.; Hao, Y.; Jing, Y.; Ptitsyn, V.; Trbojevic, D.; Tsoupas, N.

    2016-01-01

    This Note discusses on-going work regarding the modeling of eRHIC ERL in the ray-tracing code Zgoubi. The various pieces of the recirculator puzzle, their optical properties and their assemblage into an operational input data file in are addressed. The Note reports in particular on preparatory stages toward extensive end-to-end 6D polarized electron bunch transport simulations, which yield methods, as well a series of preliminary qualitative outcomes, discussed as well.

  15. DESCRIPTION OF THE RHIC SEQUENCER SYSTEM

    International Nuclear Information System (INIS)

    DOTTAVIO, T.; FRAK, B.; MORRIS, J.; SATOGATA, T.; VAN ZEIJTS, J.

    2001-01-01

    The movement of the Relativistic Heavy Ion Collider (RHIC) through its various states (eg. injection, acceleration, storage, collisions) is controlled by an application called the Sequencer. This program orchestrates most magnet and instrumentation systems and is responsible for the coordinated acquisition and saving of data from various systems. The Sequencer system, its software infrastructure, support programs, and the language used to drive it are discussed in this paper. Initial operational experience is also described

  16. Source of second order chromaticity in RHIC

    International Nuclear Information System (INIS)

    Luo, Y.; Gu, X.; Fischer, W.; Trbojevic, D.

    2011-01-01

    In this note we will answer the following questions: (1) what is the source of second order chromaticities in RHIC? (2) what is the dependence of second order chromaticity on the on-momentum β-beat? (3) what is the dependence of second order chromaticity on β* at IP6 and IP8? To answer these questions, we use the perturbation theory to numerically calculate the contributions of each quadrupole and sextupole to the first, second, and third order chromaticities.

  17. ANALYSIS OF AVAILABILITY AND RELIABILITY IN RHIC OPERATIONS

    International Nuclear Information System (INIS)

    PILAT, F.; INGRASSIA, P.; MICHNOFF, R.

    2006-01-01

    RHIC has been successfully operated for 5 years as a collider for different species, ranging from heavy ions including gold and copper, to polarized protons. We present a critical analysis of reliability data for RHIC that not only identifies the principal factors limiting availability but also evaluates critical choices at design times and assess their impact on present machine performance. RHIC availability data are typical when compared to similar high-energy colliders. The critical analysis of operations data is the basis for studies and plans to improve RHIC machine availability beyond the 50-60% typical of high-energy colliders

  18. Analysis of RHIC beam dump pre-fires

    International Nuclear Information System (INIS)

    Zhang, W.; Ahrens, L.; Fischer, W.; Hahn, H.; Mi, J.; Sandberg, J.; Tan, Y.

    2011-01-01

    It has been speculated that the beam may cause instability of the RHIC Beam Abort Kickers. In this study, we explore the available data of past beam operations, the device history of key modulator components, and the radiation patterns to examine the correlations. The RHIC beam abort kicker system was designed and built in the 90's. Over last decade, we have made many improvements to bring the RHIC beam abort kicker system to a stable operational state. However, the challenge continues. We present the analysis of the pre-fire, an unrequested discharge of kicker, issues which relates to the RHIC machine safety and operational stability.

  19. RHIC beam loss monitor system design

    International Nuclear Information System (INIS)

    Witkover, R.; Zitvogel, E.; Michnoff, R.

    1997-01-01

    The Beam Loss Monitor (BLM) System is designed to prevent the quenching of RHIC magnets due to beam loss, provide quantitative loss data, and the loss history in the event of a beam abort. The system uses 400 ion chambers of a modified Tevatron design. To satisfy fast (single turn) and slow (100 msec) loss beam criteria and provide sensitivity for studies measurements, a range of over 8 decades is needed. An RC pre-integrator reduces the dynamic range for a low current amplifier. This is digitized for data logging. The output is also applied to an analog multiplier which compensates the energy dependence, extending the range of the abort comparators. High and low pass filters separate the signal to dual comparators with independent programmable trip levels. Up to 64 channels, on 8 VME boards, are controlled by a micro-controller based VME module, decoupling it from the front-end computer (FEC) for real-time operation. Results with the detectors in the RHIC Sextant Test and the electronics in the AGS-to-RHIC (AtR) transfer line will be presented

  20. RHIC spin flipper AC dipole controller

    Energy Technology Data Exchange (ETDEWEB)

    Oddo, P.; Bai, M.; Dawson, C.; Gassner, D.; Harvey, M.; Hayes, T.; Mernick, K.; Minty, M.; Roser, T.; Severino, F.; Smith, K.

    2011-03-28

    The RHIC Spin Flipper's five high-Q AC dipoles which are driven by a swept frequency waveform require precise control of phase and amplitude during the sweep. This control is achieved using FPGA based feedback controllers. Multiple feedback loops are used to and dynamically tune the magnets. The current implementation and results will be presented. Work on a new spin flipper for RHIC (Relativistic Heavy Ion Collider) incorporating multiple dynamically tuned high-Q AC-dipoles has been developed for RHIC spin-physics experiments. A spin flipper is needed to cancel systematic errors by reversing the spin direction of the two colliding beams multiple times during a store. The spin flipper system consists of four DC-dipole magnets (spin rotators) and five AC-dipole magnets. Multiple AC-dipoles are needed to localize the driven coherent betatron oscillation inside the spin flipper. Operationally the AC-dipoles form two swept frequency bumps that minimize the effect of the AC-dipole dipoles outside of the spin flipper. Both AC bumps operate at the same frequency, but are phase shifted from each other. The AC-dipoles therefore require precise control over amplitude and phase making the implementation of the AC-dipole controller the central challenge.

  1. Description of the intense, low energy, monoenergetic positron beam at Brookhaven

    International Nuclear Information System (INIS)

    Lynn, K.G.; Mills, A.P. Jr.; Roellig, L.O.; Weber, M.

    1985-01-01

    An intense (4 x 10 7 s -1 ), low energy (approx. =1.0 eV), monoenergetic (ΔE approx. = 75 MeV) beam of positrons has been built at the Brookhaven National Laboratory. This flux is more than 10 times greater than any existing beam from radioactive sources. Plans are underway to increase further the flux by more than an order of magnitude. The intense low energy positron beam is made by utilizing the High Flux Beam Reactor at Brookhaven to produce the isotope 64 Cu with an activity of 40 curies of positrons. Source moderation techniques are utilized to produce the low energy positron beam from the high energy positrons emitted from 64 Cu. 31 refs., 7 figs

  2. Simulations to study the static polarization limit for RHIC lattice

    Science.gov (United States)

    Duan, Zhe; Qin, Qing

    2016-01-01

    A study of spin dynamics based on simulations with the Polymorphic Tracking Code (PTC) is reported, exploring the dependence of the static polarization limit on various beam parameters and lattice settings for a practical RHIC lattice. It is shown that the behavior of the static polarization limit is dominantly affected by the vertical motion, while the effect of beam-beam interaction is small. In addition, the “nonresonant beam polarization” observed and studied in the lattice-independent model is also observed in this lattice-dependent model. Therefore, this simulation study gives insights of polarization evolution at fixed beam energies, that are not available in simple spin tracking. Supported by the U.S. Department of Energy (DE-AC02-98CH10886), Hundred-Talent Program (Chinese Academy of Sciences), and National Natural Science Foundation of China (11105164)

  3. Report on the Brookhaven solar neutrino experiment

    International Nuclear Information System (INIS)

    Davis, R. Jr.; Evans, J.C. Jr.

    1976-01-01

    This report is intended as a brief statement of the recent developments and results of the Brookhaven Solar Neutrino Experiment communicated through Professor G. Kocharov to the Leningrad conference on active processes on the sun and the solar neutrino problem. The report summarizes the results of experiments performed over a period of 6 years, from April 1970 to January 1976. Neutrino detection depends upon the neutrino capture reaction 37 Cl(ν,e - ) 37 Ar producing the isotope 37 Ar (half life of 35 days). The detector contains 3.8 x 10 5 liters of C 2 Cl 4 (2.2 x 10 30 atoms of 37 Cl) and is located at a depth of 4400 meters of water equivalent (m.w.e.) in the Homestake Gold Mine at Lead, South Dakota, U.S.A. The procedures for extracting 37 Ar and the counting techniques used were described in previous reports. The entire recovered argon sample was counted in a small gas proportional counter. Argon-37 decay events were characterized by the energy of the Auger electrons emitted following the electron capture decay and by the rise-time of the pulse. Counting measurements were continued for a period sufficiently long to observe the decay of 37 Ar

  4. Increased intensity performance of the Brookhaven AGS

    International Nuclear Information System (INIS)

    Raka, E.; Ahrens, L.; Frey, W.; Gill, E.; Glenn, J.W.; Sanders, R.; Weng, W.

    1985-05-01

    With the advent of H - injection into the Brookhaven AGS, circulating beams of up to 3 x 10 13 protons at 200 MeV have been obtained. Rf capture of 2.2 x 10 13 and acceleration of 1.73 x 10 13 up to the transition energy (approx. = 8 GeV) and 1.64 x 10 13 to full energy (approx. = 29 GeV) has been achieved. This represents a 50% increase over the best performance obtained with H + injection. The increase in circulation beam current is obtained without filling the horizontal aperture. This allows the rf capture process to utilize a larger longitudinal phase space area (approx. = 1 eV sec/bunch vs less than or equal to 0.6 eV sec with H + operation). The resulting reduction in relative longitudinal density partially offsets the increase in space charge effects at higher currents. In order to make the capture process independent of injected beam current, a dynamic beam loading compensation loop was installed on the AGS rf system. This is the only addition to the synchrotron itself that was required to reach the new intensity records. A discussion of injection, the rf capture process, and space charge effects is presented. 9 refs., 5 figs

  5. Proposed Brookhaven accelerator-based neutron generator

    International Nuclear Information System (INIS)

    Grand, P.; Batchelor, K.; Chasman, R.; Rheaume, R.

    1976-01-01

    The d-Li Neutron Source concept, which includes a high-current dueteron linac, is an outgrowth of attempts made to use the BNL, 200-MeV proton linac BLIP facility to do radiation damage studies. It included a 100 mA, 30-MeV deuteron linear accelerator and a fast-flowing liquid lithium jet as the target. The latest design is not very different, except that the current is now 200 mA and the linac energy has been raised to 35 MeV. Both parameters, were changed to optimize the effectiveness of the facility with respect to flux, experimental volume and match to 14 MeV neutron-radiation-damage effects. The proposed Brookhaven Accelerator-based Neutron Generator is described with particular emphasis on the linear accelerator. The proposed facility is a practical and efficient way of producing the intense, high energy neutron beams needed for CTR material studies. The accelerator and liquid-metal technologies are well proven, state-of-the-art technologies. The fact that no new technology is required guarantees the possibility of meeting construction schedules, and more importantly, guarantees a high level of operational reliability

  6. OVERVIEW AND STATUS OF THE STAR DETECTOR AT RHIC

    International Nuclear Information System (INIS)

    CHRISTIE, W.B.

    1999-01-01

    Presented here is the current status of the STAR Detector. STAR is one of the four detectors being constructed at the RHIC collider facility. The STAR detector is scheduled to have its first engineering run with the RHIC beams about six months from the date of this conference. The STAR project is on schedule and expects to recomplete on time

  7. Rebuilding the Brookhaven high flux beam reactor: A feasibility study

    International Nuclear Information System (INIS)

    Brynda, W.J.; Passell, L.; Rorer, D.C.

    1995-01-01

    After nearly thirty years of operation, Brookhaven's High Flux Beam Reactor (HFBR) is still one of the world's premier steady-state neutron sources. A major center for condensed matter studies, it currently supports fifteen separate beamlines conducting research in fields as diverse as crystallography, solid-state, nuclear and surface physics, polymer physics and structural biology and will very likely be able to do so for perhaps another decade. But beyond that point the HFBR will be running on borrowed time. Unless appropriate remedial action is taken, progressive radiation-induced embrittlement problems will eventually shut it down. Recognizing the HFBR's value as a national scientific resource, members of the Laboratory's scientific and reactor operations staffs began earlier this year to consider what could be done both to extend its useful life and to assure that it continues to provide state-of-the-art research facilities for the scientific community. This report summarizes the findings of that study. It addresses two basic issues: (i) identification and replacement of lifetime-limiting components and (ii) modifications and additions that could expand and enhance the reactor's research capabilities

  8. Decommissioning of the High Flux Beam Reactor at Brookhaven Lab

    Energy Technology Data Exchange (ETDEWEB)

    Hu, J. P. [Brookhaven National Lab. (BNL), Upton, NY (United States); Reciniello, R. N. [Brookhaven National Lab. (BNL), Upton, NY (United States); Holden, N. E. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2011-05-27

    The High Flux Beam Reactor at the Brookhaven National Laboratory was a heavy water cooled and moderated reactor that achieved criticality on October 31, 1965. It operated at a power level of 40 mega-watts. An equipment upgrade in 1982 allowed operations at 60 mega-watts. After a 1989 reactor shutdown to reanalyze safety impact of a hypothetical loss of coolant accident, the reactor was restarted in 1991 at 30 mega-watts. The HFBR was shutdown in December 1996 for routine maintenance and refueling. At that time, a leak of tritiated water was identified by routine sampling of ground water from wells located adjacent to the reactor’s spent fuel pool. The reactor remained shutdown for almost three years for safety and environmental reviews. In November 1999 the United States Department of Energy decided to permanently shutdown the HFBR. The decontamination and decommissioning of the HFBR complex, consisting of multiple structures and systems to operate and maintain the reactor, were complete in 2009 after removing and shipping off all the control rod blades. The emptied and cleaned HFBR dome which still contains the irradiated reactor vessel is presently under 24/7 surveillance for safety. Details of the HFBR cleanup conducted during 1999-2009 will be described in the paper.

  9. Seismic upgrading of the Brookhaven High Flux Beam Research Reactor

    International Nuclear Information System (INIS)

    Subudhi, M.

    1985-01-01

    In recent years the High Flux Beam Research (HFBR) reactor facility at Brookhaven National Laboratory (BNL) was upgraded from 40 to 50 MW power level. The reactor plant was built in the early sixties to the seismic design requirements of the period, using the static load approach. While the plant power level was upgraded, the seismic design was also improved according to current design criteria. This included the development of new floor response spectra for the facility and an overall seismic analysis of those systems important to the safe shutdown of the reactor. Items included in the reanalysis are the containment building with its internal structure, the piping systems, tanks, equipment, and heat exchangers. This paper describes the procedure utilized in developing the floor response spectra for the existing facility. Also included in the paper are the findings and recommendations, based on the seismic analysis, regarding the seismic adequacy of structural and mechanical systems vital to achieving the safe shutdown of the reactor. 11 references, 4 figures, 1 table

  10. The magnet system of the Relativistic Heavy Ion Collider (RHIC)

    International Nuclear Information System (INIS)

    Greene, A.; Anerella, M.; Cozzolino, J.

    1995-01-01

    The Relativistic Heavy Ion Collider now under construction at Brookhaven National Laboratory (BNL) is a colliding ring accelerator to be completed in 1999. Through collisions of heavy ions it is hoped to observe the creation of matter at extremely high temperatures and densities, similar to what may have occurred in the original ''Big Bang.'' The collider rings will consist of 1740 superconducting magnet elements. Some of elements are being manufactured by industrial partners (Northrop Grumman and Everson Electric). Others are being constructed or assembled at BNL. A description is given of the magnet designs, the plan for manufacturing and test results. In the manufacturing of the magnets, emphasis has been placed on uniformity of their performance and on quality. Results so far indicate that this emphasis has been very successful

  11. A Model of RHIC Using the Unified Accelerator Libraries

    Energy Technology Data Exchange (ETDEWEB)

    Pilat, F. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tepikian, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Trahern, C. G. [Brookhaven National Lab. (BNL), Upton, NY (United States); Malitsky, N. [Cornell Univ., Ithaca, NY (United States)

    1998-01-01

    The Unified Accelerator Library (UAL) is an object oriented and modular software environment for accelerator physics which comprises an accelerator object model for the description of the machine (SMF, for Standard Machine Format), a collection of Physics Libraries, and a Perl inte,face that provides a homo­geneous shell for integrating and managing these components. Currently available physics libraries include TEAPOT++, a collection of C++ physics modules conceptually derived from TEAPOT, and DNZLIB, a differential algebra package for map generation. This software environment has been used to build a flat model of RHIC which retains the hierarchical lat­tice description while assigning specific characteristics to individual elements, such as measured field har­monics. A first application of the model and of the simulation capabilities of UAL has been the study of RHIC stability in the presence of siberian snakes and spin rotators. The building blocks of RHIC snakes and rotators are helical dipoles, unconventional devices that can not be modeled by traditional accelerator phys­ics codes and have been implemented in UAL as Taylor maps. Section 2 describes the RHIC data stores, Section 3 the RHIC SMF format and Section 4 the RHIC spe­cific Perl interface (RHIC Shell). Section 5 explains how the RHIC SMF and UAL have been used to study the RHIC dynamic behavior and presents detuning and dynamic aperture results. If the reader is not familiar with the motivation and characteristics of UAL, we include in the Appendix an useful overview paper. An example of a complete set of Perl Scripts for RHIC simulation can also be found in the Appendix.

  12. LEPTON AND PHOTON PHYSICS AT RHIC

    International Nuclear Information System (INIS)

    TANNENBAUM, M.J.

    2003-01-01

    Results on physics at RHIC using outgoing leptons and photons will be presented from Au+Au collisions at nucleon-nucleon c.m. energies √(sNN) = 130 GeV and 200 GeV, and from p-p collisions at √(sNN) = 200 GeV. Introduction and motivation will be presented both from the theoretical and experimental perspectives. Topics include open charm production via single e ± , J/Ψ → e + + e - , μ + + μ - and inclusive photon production

  13. RHIC spin physics: Proceedings. Volume 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    This proceedings compiles one-page summaries and five transparencies for each talk, with the intention that the speaker should include a web location for additional information in the summary. Also, email addresses are given with the participant list. The order follows the agenda: gluon, polarimetry, accelerator, W production and quark/antiquark polarization, parity violation searches, transversity, single transverse spin, small angle elastic scattering, and the final talk on ep collisions at RHIC. The authors begin the Proceedings with the full set of transparencies from Bob Jaffe`s colloquium on spin, by popular request.

  14. RHIC spin physics: Proceedings. Volume 7

    International Nuclear Information System (INIS)

    1998-01-01

    This proceedings compiles one-page summaries and five transparencies for each talk, with the intention that the speaker should include a web location for additional information in the summary. Also, email addresses are given with the participant list. The order follows the agenda: gluon, polarimetry, accelerator, W production and quark/antiquark polarization, parity violation searches, transversity, single transverse spin, small angle elastic scattering, and the final talk on ep collisions at RHIC. The authors begin the Proceedings with the full set of transparencies from Bob Jaffe's colloquium on spin, by popular request

  15. Polarization response of RHIC electron lens lattices

    International Nuclear Information System (INIS)

    Ranjbar, V. H.; Méot, F.; Bai, M.; Abell, D. T.; Meiser, D.

    2016-01-01

    Depolarization response for a system of two orthogonal snakes at irrational tunes is studied in depth using lattice independent spin integration. Particularly, we consider the effect of overlapping spin resonances in this system, to understand the impact of phase, tune, relative location and threshold strengths of the spin resonances. Furthermore, these results are benchmarked and compared to two dimensional direct tracking results for the RHIC e-lens lattice and the standard lattice. We then consider the effect of longitudinal motion via chromatic scans using direct six dimensional lattice tracking.

  16. Some calculations for the RHIC kicker

    International Nuclear Information System (INIS)

    Claus, J.

    1996-12-01

    This paper starts with a brief discussion of the design of the RHIC injection kicker magnets which calls for longitudinal and capacitive sections of the same order as the aperture, not much larger nor much smaller. This makes accurate analytical prediction of their behavior very difficult. In order to gain at least some qualitative insight of that behavior, the author preformed calculations which are based on the actual dimensions of the kickers but which neglect the end effects of the individual sections. The effects of the sectionalization are therefore exaggerated relative to reality in the results

  17. Electronics for the RHIC PHENIX detector

    International Nuclear Information System (INIS)

    Young, G.R.

    1992-01-01

    The PHENIX detector for RHIC is being designed to measure lepton pairs, direct photons and hadrons emitted in collisions of heavy nuclei at center of mass energies up to 200 GeV/(nucleon-pair). The physics goal is tests of predictions concerning the existence and nature of a deconfined state of strongly-interacting matter. The relatively large final state multiplicities, which reach 1500 charged particles per unit of rapidity, place strong demands on detector segmentation and control of electronics cost and power consumption. An overview of present ideas concerning signal processing and data rates for PHENIX will be presented

  18. FEASIBILITY OF INCREASING THE ENERGY OF RHIC

    International Nuclear Information System (INIS)

    MACKAY, W.W.; JAIN, A.; LUCCIO, A.U.; PILAT, F.; ROSER, T.; TEPIKIAN, S.; TROBOJEVIC, D.

    2001-01-01

    In this paper we discuss the possibility of increasing the energy of beams in RHIC by as much as 30% with a modest trade-off in luminosity. The arc dipoles and quadrupoles were designed with considerable margin. For higher energies (>100 GeV/nucleon) the minimum β* may be required to increase as the interaction region triplets saturate. The separator magnets (DX) have the least margin for increased field, so we consider three scenarios: allowing for a small crossing angle with the present DX magnets, upgrading the DX magnets to higher strength, and permitting a crossing angle of ∼1degree by removing the DX magnets altogether

  19. Heavy flavour production at RHIC and LHC

    Directory of Open Access Journals (Sweden)

    Innocenti Gian Michele

    2018-01-01

    Full Text Available In this proceedings, I present selected experimental results on heavy-flavour production at RHIC and at the LHC, which were presented at the Strangeness in Quark Matter 2017 conference. I will present a brief introduction to the heavy-flavour physics in heavy ion collisions and I will focus on recents measurements of in-medium energy loss and and collective properties of heavy-flavour particles, which provided important information on the mechanisms of heavy flavour interaction with the hot and dense medium created in ultra-relativistic heavy-ion collisions.

  20. Polarization response of RHIC electron lens lattices

    Directory of Open Access Journals (Sweden)

    V. H. Ranjbar

    2016-10-01

    Full Text Available Depolarization response for a system of two orthogonal snakes at irrational tunes is studied in depth using lattice independent spin integration. In particular we consider the effect of overlapping spin resonances in this system, to understand the impact of phase, tune, relative location and threshold strengths of the spin resonances. These results are benchmarked and compared to two dimensional direct tracking results for the RHIC e-lens lattice and the standard lattice. Finally we consider the effect of longitudinal motion via chromatic scans using direct six dimensional lattice tracking.

  1. TRANSVERSE OPTICS IMPROVEMENTS FOR RHIC RUN 4.

    Energy Technology Data Exchange (ETDEWEB)

    VAN ZEIJTS,J.

    2004-07-05

    The magnetic settings in RHIC are driven by an on-line model, and the quality of the resulting lattice functions depend on the correctness of the settings, and knowledge of the magnet transfer-functions. Here we first present the different inputs into the model, including dipole sextupole components, used to set tunes and chromaticities along the ramp. Based on an analysis of measured tunes along the FY03 polarized proton ramp, we present predictions for quadrupole transfer-function changes which have been implemented for the FY04 Au ramp. We show the improved model agreement for tunes along the ramp, and measured transverse phase-advance at store.

  2. THE RHIC BEAM ABORT KICKER SYSTEM

    International Nuclear Information System (INIS)

    Hahn, H.

    1999-01-01

    THE ENERGY STORED IN THE RHIC BEAM IS ABOUT 200 KJ PER RING AT DESIGN ENERGY AND INTENSITY. TO PREVENT QUENCHING OF THE SUPERCONDUCTING MAGNETS OR MATERIAL DAMAGE, THE BEAM WILL BE SAFELY DISPOSED OF BY AN INTERNAL BEAM ABORT SYSTEM, WHICH INCLUDES THE KICKER MAGNETS, THE PULSED POWER SUPPLIES, AND THE DUMP ABSORBER. DISPOSAL OF HEAVY IONS, SUCH AS GOLD, IMPOSES DESIGN CONSTRAINTS MORE SEVERE THAN THOSE FOR PROTON BEAMS OF EQUAL INTENSITY. IN ORDER TO MINIMIZE THE THERMAL SHOCK IN THE CARBON-FIBER DUMP BLOCK, THE BUNCHES MUST BE LATERALLY DISPERSED

  3. B-physics at RHIC: An opportunity

    International Nuclear Information System (INIS)

    Atiya, M.S.; White, S.; Marx, M.

    1994-01-01

    B physics provides a unique window for investigation and confirmation of our picture of CP violation, as well as an opportunity to explore physics beyond the Standard Model. Because of this richness of physics, programs for the study of the B sector are in progress or under development at most of the major facilities for high energy physics in the world. In this note we suggest that a B program at the RHIC facility at BNL could provide timely and complementary information to our understanding of physics within and beyond the Standard Model

  4. "Upgraded" physics at the LHC and RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Llope, W. J. [Wayne State University, Detroit, MI (United States)

    2017-09-03

    Closeout materials enclosed. This grant supported a postdoctoral scientist (S. Jowzaee) and the tuition for a graduate student (B. Erko), both working under the supervision of Prof. W.J. Llope at Wayne State University. Travel to a STAR Collaboration Meeting and the Quark Matter 2017 conference was also supported. The physics research concentrated on particle-identified two-particle correlations in the Beam Energy Scan data from the STAR experiment at RHIC. S. Jowzaee gave an oral presentation on this research at the Quark Matter 2017 conference.

  5. Proceedings of the third workshop on experiments and detectors for a relativistic heavy ion collider (RHIC)

    International Nuclear Information System (INIS)

    Shivakumar, B.; Vincent, P.

    1988-01-01

    This report contains papers on the following topics: the RHIC Project; summary of the working group on calorimetry; J//Psi/ measurements in heavy ion collisions at CERN; QCD jets at RHIC; tracking and particle identification; a 4π tracking spectrometer for RHIC; Bose-Einstein measurements at RHIC in light of new data; summary of working group on read-out electronics; data acquisition for RHIC; summary of the working group on detector simulation; B-physics at RHIC; and CP violation revisited at BNL, B-physics at RHIC

  6. Current status of PHOBOS at sign RHIC

    International Nuclear Information System (INIS)

    Betts, R.R.; Univ. of Illinois, Chicago, IL

    1996-01-01

    Four experiments are currently approved for the first measurements with colliding heavy ion beams from the Relativistic Heavy Ion Collider (RHIC) which is scheduled to come into operation in Spring 1999. These experiments are named STAR, Phoenix, PHOBOS and Brahms. It is expected that central collisions of 100 GeV/u Au + Au at RHIC will lead to energy densities far above any so far attained in the laboratory and it is suspected and hoped that this situation will lead to qualitatively new physics perhaps associated with the creation of a large volume containing a plasma of deconfined quarks and gluons. All four experiments attempt to search for signatures of new physics through combinations of measurements of quantities such as the multiplicity of produced particles, the average transverse momentum of these particles, fluctuations in their multiplicity distribution, their flavor composition, the size scales of the volume from which they are emitted, mass shifts and changes in the decay widths of resonances which decay inside the high energy density volume etc. The PHOBOS detector addresses these issues with a Multiplicity Array which covers the pseudo-rapidity region -5.3 ≤ η ≤ 5.3 with a coverage of 85% of 4π and also incorporates a Vertex Detector. The Multiplicity Array is complemented by two Multi-Particle Spectrometers, each of which cover the range 0.5 ≤ η ≤ 1.5 and azimuthal angle range Δφ = 11 degree. Various trigger and monitor detectors complete PHOBOS

  7. CONTINUOUS ABORT GAP CLEANING AT RHIC

    International Nuclear Information System (INIS)

    DREES, A.; FLILLER, R.III.; FU, W.; MICHNOFF, R.

    2004-01-01

    Since the RHIC Au-Au run in the year 2001 the 200 MHz cavity system was used at storage and a 28 MHz system during injection and acceleration. The rebucketing procedure potentially causes a higher debunching rate of heavy ion beams in addition to amplifying debunching due to other mechanisms. At the end of a four hour store, debunched beam can easily account for more than 50% of the total beam intensity. This effect is even stronger with the achieved high intensities of the RHIC Au-Au run in 2004. A beam abort at the presence of a lot of debunched beam bears the risk of magnet quenching and experimental detector damage due to uncontrolled beam losses. Thus it is desirable to avoid any accumulation of debunched beam from the beginning of each store, in particular to anticipate cases of unscheduled beam aborts due to a system failure. A combination of a fast transverse kickers and the new 2-stage copper collimator system are used to clean the abort gap continuously throughout the store with a repetition rate of 1 Hz. This report gives. an overview of the new gap cleaning procedure and the achieved performance

  8. UP-GRADED RHIC INJECTION SYSTEM.

    Energy Technology Data Exchange (ETDEWEB)

    HAHN,H.FISCHER,W.SEMERTZIDIS,Y.K.WARBURTON,D.S.

    2003-05-12

    The design of the RHIC injection systems anticipated the possibility of filling and operating the rings with a 120 bunch pattern, corresponding to 110 bunches after allowing for the abort gap. Beam measurements during the 2002 run confirmed the possibility, although at the expense of severe transverse emittance growth and thus not on an operational basis. An improvement program was initiated with the goal of reducing the kicker rise time from 110 to {approx}95 ns and of minimizing pulse timing jitter and drift. The major components of the injection system are 4 kicker magnets and Blmlein pulsers using thyratron switches. The kicker terminating resistor and operating voltage was increased to reduce the rise time. Timing has been stabilized by using commercial trigger units and extremely stable dc supplies for the thyratron reservoir. A fiber optical connection between control room and the thyratron trigger unit has been provided, thereby allowing the operator to adjust timing individually for each kicker unit. The changes were successfully implemented for use in the RHIC operation.

  9. The PHOBOS perspective on discoveries at RHIC

    Science.gov (United States)

    Back, B. B.; Baker, M. D.; Ballintijn, M.; Barton, D. S.; Becker, B.; Betts, R. R.; Bickley, A. A.; Bindel, R.; Budzanowski, A.; Busza, W.; Carroll, A.; Chai, Z.; Decowski, M. P.; García, E.; Gburek, T.; George, N. K.; Gulbrandsen, K.; Gushue, S.; Halliwell, C.; Hamblen, J.; Harrington, A. S.; Hauer, M.; Heintzelman, G. A.; Henderson, C.; Hofman, D. J.; Hollis, R. S.; Hołyński, R.; Holzman, B.; Iordanova, A.; Johnson, E.; Kane, J. L.; Katzy, J.; Khan, N.; Kucewicz, W.; Kulinich, P.; Kuo, C. M.; Lee, J. W.; Lin, W. T.; Manly, S.; McLeod, D.; Mignerey, A. C.; Nouicer, R.; Olszewski, A.; Pak, R.; Park, I. C.; Pernegger, H.; Reed, C.; Remsberg, L. P.; Reuter, M.; Roland, C.; Roland, G.; Rosenberg, L.; Sagerer, J.; Sarin, P.; Sawicki, P.; Seals, H.; Sedykh, I.; Skulski, W.; Smith, C. E.; Stankiewicz, M. A.; Steinberg, P.; Stephans, G. S. F.; Sukhanov, A.; Tang, J.-L.; Tonjes, M. B.; Trzupek, A.; Vale, C. M.; van Nieuwenhuizen, G. J.; Vaurynovich, S. S.; Verdier, R.; Veres, G. I.; Wenger, E.; Wolfs, F. L. H.; Wosiek, B.; Woźniak, K.; Wuosmaa, A. H.; Wysłouch, B.; Zhang, J.; Phobos Collaboration

    2005-08-01

    This paper describes the conclusions that can be drawn from the data taken thus far with the PHOBOS detector at RHIC. In the most central Au + Au collisions at the highest beam energy, evidence is found for the formation of a very high energy density system whose description in terms of simple hadronic degrees of freedom is inappropriate. Furthermore, the constituents of this novel system are found to undergo a significant level of interaction. The properties of particle production at RHIC energies are shown to follow a number of simple scaling behaviors, some of which continue trends found at lower energies or in simpler systems. As a function of centrality, the total number of charged particles scales with the number of participating nucleons. When comparing Au + Au at different centralities, the dependence of the yield on the number of participants at higher p ( ˜4 GeV/c) is very similar to that at low transverse momentum. The measured values of charged particle pseudorapidity density and elliptic flow were found to be independent of energy over a broad range of pseudorapidities when effectively viewed in the rest frame of one of the colliding nuclei, a property we describe as "extended longitudinal scaling". Finally, the centrality and energy dependences of several observables were found to factorize to a surprising degree.

  10. High luminosity electron-hadron collider eRHIC

    Energy Technology Data Exchange (ETDEWEB)

    Ptitsyn, V.; Aschenauer, E.; Bai, M.; Beebe-Wang, J.; Belomestnykh, S.; Ben-Zvi, I.; Blaskiewicz, M..; Calaga, R.; Chang, X.; Fedotov, A.; Gassner, D.; Hammons, L.; Hahn, H.; Hammons, L.; He, P.; Hao, Y.; Jackson, W.; Jain, A.; Johnson, E.C.; Kayran, D.; Kewisch, J.; Litvinenko, V.N.; Luo, Y.; Mahler, G.; McIntyre, G.; Meng, W.; Minty, M.; Parker, B.; Pikin, A.; Rao, T.; Roser, T.; Skaritka, J.; Sheehy, B.; Skaritka, J.; Tepikian, S.; Than, Y.; Trbojevic, D.; Tsoupas, N.; Tuozzolo, J.; Wang, G.; Webb, S.; Wu, Q.; Xu, W.; Pozdeyev, E.; Tsentalovich, E.

    2011-03-28

    We present the design of a future high-energy high-luminosity electron-hadron collider at RHIC called eRHIC. We plan on adding 20 (potentially 30) GeV energy recovery linacs to accelerate and to collide polarized and unpolarized electrons with hadrons in RHIC. The center-of-mass energy of eRHIC will range from 30 to 200 GeV. The luminosity exceeding 10{sup 34} cm{sup -2} s{sup -1} can be achieved in eRHIC using the low-beta interaction region with a 10 mrad crab crossing. We report on the progress of important eRHIC R&D such as the high-current polarized electron source, the coherent electron cooling, ERL test facility and the compact magnets for recirculation passes. A natural staging scenario of step-by-step increases of the electron beam energy by building-up of eRHIC's SRF linacs is presented.

  11. Critical examination of RHIC paradigms - mostly high pT

    International Nuclear Information System (INIS)

    Tannenbaum, M.I.

    2009-01-01

    A critical examination of RHIC paradigms is presented. Topics include: search for a critical point with a low energy scan; the lack of understanding of radiative processes in a medium in QCD compared in detail to examples from QED; the reason why some physicists started to measure particles at large p T in the 1960's; a review of the discovery of hard-scattering in p-p collisions in the 1970's via single-inclusive and two-particle correlations and application of these techniques at RHIC. Several paradigms in both soft and hard physics which are popular at RHIC are discussed and challenged.

  12. Modeling RHIC using the standard machine formal accelerator description

    International Nuclear Information System (INIS)

    Pilat, F.; Trahern, C.G.; Wei, J.

    1997-01-01

    The Standard Machine Format (SMF) is a structured description of accelerator lattices which supports both the hierarchy of beam lines and generic lattice objects as well as those deviations (field errors, alignment efforts, etc.) associated with each component of the as-installed machine. In this paper we discuss the use of SMF to describe the Relativistic Heavy Ion Collider (RHIC) as well as the ancillary data structures (such as field quality measurements) that are necessarily incorporated into the RHIC SMF model. Future applications of SMF are outlined, including its use in the RHIC operational environment

  13. Hypernucleus Production at RHIC and HIRFL-CSR Energy

    International Nuclear Information System (INIS)

    Zhang, S.; Xu, Z.; Chen, J.H.; Ma, Y.G.; Tang, Z.B.

    2010-01-01

    We calculated the hypertriton production at RHIC-STAR and HIRFL-CSR acceptance, with a multi-phase transport model (AMPT) and a relativistic transport model (ART), respectively. In specific, we calculated the Strangeness Population Factor S 3 = Λ 3 H/( 3 H e x Λ/p) at different beam energy. Our results from AGS to RHIC energy indicated that the collision system may change from hadronic phase at AGS energies to partonic phase at RHIC energies. Our calculation at HIRFL-CSR energy supports the proposal to measure hypertriton at HIRFL-CSR.

  14. A microwiggler Free-Electron Laser at the Brookhaven Accelerator Test Facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Ben-Zvi, I.; Fernow, R.; Gallardo, J.; Kirk, H.; Pellegrini, C.; van Steenbergen, A.; Bhowmik, A.; Rockwell International Corp., Canoga Park, CA

    1989-01-01

    We report the design and status of an FEL experiment at the Brookhaven National Laboratory Accelerator Test Facility. A 50 MeV high brightness electron beam will be utilized for an oscillator experiment in the visible wavelength region. The microwiggler to be used is a superferric planar undulator with a 0.88 cm period, 60 cm length and K = 0.35. The optical cavity is a 368 cm long stable resonator with broadband dielectric coated mirrors. 8 refs., 2 figs., 4 tabs

  15. The Grumman/Brookhaven high-brightness, high-duty factor RF gun

    International Nuclear Information System (INIS)

    Lehrman, I.S.; Birnbaum, I.A.; Cole, M.; Fixler, S.Z.; Heuer, R.L.; Siddiqi, S.; Sheedy, E.; Waren, G.D.

    1992-01-01

    Under a joint collaboration between Brookhaven National Laboratory and the Grumman Corporation, a high-duty (>1%) photocathode RF gun is under construction for use at the ATF facility at BNL. The gun will be capable of producing short ( 300 A (after compression) and a total bunch charge in excess of 3 nC. The gun consists of 3-1/2 cells constructed from GlidCop, an alumina dispersion strengthened copper alloy. Two individually phased waveguides are used to power the first two and final two cells. (Author) 10 refs., 8 figs., 2 tabs

  16. First turn around strategy for RHIC

    International Nuclear Information System (INIS)

    Milutinovic, J.; Ruggiero, A.G.

    1991-06-01

    We present a strategy for achieving the so-called first turn around in RHIC. The strategy is based on the same method we had proposed to correct a distorted closed orbit in RHIC, i.e., on a generalization of the local three-bump method. We found out that the method is very effective in passing the beam through a non-ideal, insufficiently known, machine. We tested that software on ten different Gaussian distributions of dominant orbit distorting lattice imperfections. The perturbed lattice was generated by the code PATRIS, which was also adapted to control the newly developed software. In all of the ten distributions the software was capable of passing the beam through in 2--3 injection attempts, at full sextupole strength. It was also determined that once the beam makes the first turn around and all the correctors are energized, it stays in the machine for at least several hundred turns that we had checked. The quality of the orbit, that was established in this way, was also found to be very good, i.e., the residual distortions at the places of large beta function were much less than one millimeter. With one or two monitors/correctors broken, the software established a first turn around without any extra difficulties. The quality of such orbit was, of course, somewhat degraded, especially around the broken devices. It was also observed that, in the process of actual closing, the beam develops free betatron oscillations in the amplitude range of 1--5 mm, which can be reduced either by changing the injection conditions to better match the actual closed orbit or by an appropriate damping device. The hardware proposed for RHIC is more than sufficient to meet the demands of the first turn controlling software. The maximum kick angle to be applied to the beam would require less than 2/3 of the corrector's top strength even at the top magnetic rigidity Bρ = 850 T·m, which means that the correctors will be performing an easy task at injection

  17. How It's Made - Polarized Proton Beam (444th Brookhaven Lecture)

    International Nuclear Information System (INIS)

    Zelenski, Anatoli

    2008-01-01

    Experiments with polarized beams at RHIC will provide fundamental tests of QCD, and the electro-weak interaction reveal the spin structure of the proton. Polarization asymmetries and parity violation are the strong signatures for identification of the fundamental processes, which are otherwise inaccessible. Such experiments require the maximum available luminosity and therefore polarization must be obtained as an extra beam quality without sacrificing intensity. There are proposals to polarize the high-energy proton beam in the storage rings by the Stern-Gerlach effect or spin-filter techniques. But so far, the only practically available option is acceleration of the polarized beam produced in the source and taking care of polarization survival during acceleration and storage. Two major innovations -- the 'Siberian Snake' technique for polarization preservation during acceleration and high current polarized proton sources make spin physics with the high-energy polarized beams feasible. The RHIC is the first high-energy collider, where the 'Siberian Snake' technique allowed of polarized proton beam acceleration up-to 250 GeV energy. The RHIC unique Optically Pumped Polarized Ion Source produces sufficient polarized beam intensity for complete saturation of the RHIC acceptance. This polarization technique is based on spin-transfer collisions between a proton or atomic hydrogen beam of a few keV beam energy and optically pumped alkali metal vapors. From the first proposal and feasibility studies to the operational source this development can be considered as example of successful unification of individual scientists ingenuity, international collaboration and modern technology application for creation of a new polarization technique, which allowed of two-to-three order of magnitude polarized beam intensity increase sufficient for loading the RHIC to its full capacity for polarization studies.

  18. Physics at Relativistic Heavy Ion Collider (RHIC)

    International Nuclear Information System (INIS)

    Shuryak, E.V.

    1990-08-01

    This introductory talk contains a brief discussion of future experiments at RHIC related to physics of superdense matter. In particular, we consider the relation between space-time picture of the collision and spectra of the observed secondaries. We discuss where one should look for QGP signals and for possible manifestation of the phase transition. We pay more attention to a rather new topic: hadron modification in the gas phase, which is interesting by itself as a collective phenomenon, and also as a precursor indicating what happens with hadrons near the phase transition. We briefly review current understanding of the photon physics, dilepton production, charm and strangeness and J/ψ suppression. At the end we try to classify all possible experiments. 47 refs., 3 figs

  19. Code generation of RHIC accelerator device objects

    International Nuclear Information System (INIS)

    Olsen, R.H.; Hoff, L.; Clifford, T.

    1995-01-01

    A RHIC Accelerator Device Object is an abstraction which provides a software view of a collection of collider control points known as parameters. A grammar has been defined which allows these parameters, along with code describing methods for acquiring and modifying them, to be specified efficiently in compact definition files. These definition files are processed to produce C++ source code. This source code is compiled to produce an object file which can be loaded into a front end computer. Each loaded object serves as an Accelerator Device Object class definition. The collider will be controlled by applications which set and get the parameters in instances of these classes using a suite of interface routines. Significant features of the grammar are described with details about the generated C++ code

  20. Inconsistencies in Models for RHIC and LHC

    CERN Document Server

    Werner, K; Ostapchenko, S; Pierog, T

    2002-01-01

    The interpretation of experimental results at RHIC and in the future also at LHC requires very reliable and realistic models. Considerable effort has been devoted to the development of such models during the past decade, many of them being heavily used in order to analyze data. It is the purpose of this paper to point out serious inconsistencies in the above-mentioned approaches. We will demonstrate that requiring theoretical self-consistency reduces the freedom in modeling high energy nuclear scattering enormously. We will introduce a fully self-consistent formulation of the multiple-scattering scheme in the framework of a Gribov-Regge type effective theory. In addition, we develop new computational techniques which allow for the first time a satisfactory solution of the problem in the sense that calculations of observable quantities can be done strictly within a self-consistent formalism.

  1. Hadron spectroscopy and B physics at RHIC

    International Nuclear Information System (INIS)

    Chung, S.U.; Weygand, D.P.; Willutzki, H.J.

    1991-11-01

    A description is given of the physics opportunities at RHIC regarding quark-gluon spectroscopy. The basic idea is to isolate with appropriate triggers the sub-processes pomeron + pomeron → hadrons and γ * + γ * → hadrons with the net effective mass of hadrons in the range of 1.0 to 10.0 GeV, in order to study the hadronic states composed of quarks and gluons. The double-pomeron interactions are expected to produce glueballs and hybrids preferentially, while the two-offshell-photon initial states should couple predominantly to quarkonia and multiquark states. Of particular interest is the possibility of carrying out a CP-violation study in the self-tagging B decays, B d 0 → K + π - and bar B d 0 → K - π + . 20 refs., 4 figs

  2. MEASUREMENT OF TRANSVERSE ECHOES IN RHIC

    International Nuclear Information System (INIS)

    FISCHER, W.; SATOGATA, T.; TOMAS, R.

    2005-01-01

    Beam echoes are a very sensitive method to measure diffusion, and longitudinal echo measurements were performed in a number of machines. In RHIC, for the first time, a transverse beam echo was observed after applying a dipole kick followed by a quadrupole .kick. After application of the dipole kick, the dipole moment decohered completely due to lattice nonlinearities. When a quadrupole kick is applied at time τ after the dipole kick, the beam re-cohered at time 2τ thus showing an echo response. We describe the experimental setup and measurement results. In the measurements the dipole and quadrupole kick amplitudes, amplitude dependent tune shift, and the time between dipole and quadrupole kick were varied. In addition, measurements were taken with gold bunches of different intensities. These should exhibit different transverse diffusion rates due to intra-beam scattering

  3. COUPLING MEASUREMENT AND CORRECTION AT RHIC

    International Nuclear Information System (INIS)

    PILAT, F.; BEEBE-WANG, J.; FISCHER, W.; PTITSYN, V.; SATOGATA, T.

    2002-01-01

    Coupling correction at RHIC has been operationally achieved through a two-step process: using local triplet skew quadrupoles to compensate coupling corn rolled low-beta triplet quadrupoles, and minimizing the tune separation and residual coupling with orthogonal global skew quadrupole families. An application has been developed for global correction that allows skew quadrupole tuning and tune display with a choice of different tune measurement techniques, including tune-meter, Schottky and phase lock loop (PLL). Coupling effects have been analyzed by using 1024-turn (TBT) information from the beam position monitor (BPM) system. These data allow the reconstruction of the off-diagonal terms of the transfer matrix, a measure of global coupling. At both injection and storage energies, coordination of tune meter kicks with TBT acquisition at 322 BPW's in each ring allows the measurement of local coupling at all BPM locations

  4. Wiggler as spin rotators for RHIC

    International Nuclear Information System (INIS)

    Luccio, A.; Conte, M.

    1993-01-01

    The spin of a polarized particle in a circular accelerator can be rotated with an arrangement of dipoles with field mutually perpendicular and perpendicular to the orbit. To achieve spin rotation, a given field integral value is required. The device must be designed in a way that the particle orbit is distorted as little as possible. It is shown that wigglers with many periods are suitable to achieve spin rotation with minimum orbit distortions. Wigglers are also more compact than more established structures and will use less electric power. Additional advantages include their use for non distructive beam diagnostics. Results are given for the Relativistic Heavy Ion Collider (RHIC) in the polarized proton mode

  5. Conceptual Design of the RHIC Dump Core

    Energy Technology Data Exchange (ETDEWEB)

    Stevens, A. J. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    1995-09-26

    Conceptually, the internal dump consists of a "core" whose purpose is to absorb the energy of the beam, and surrounding shielding whose purpose is to attenuate radiation. Design of the core for an internal dump has two problems which must be overcome. The first problem is preserving the integrity of the dump core. The bunches must be dispersed laterally an amount sufficient to keep the energy density from cracking the dump core material. Since the dump kickers in RHIC are only ~25m upstream of the entrance face of the dump, this is i a difficult problem. The second problem, not addressed in this note, is that dumping the beam should not quench downstream magnets. Preliminary calculations related to both of these problems have been presented in earlier notes.

  6. RHIC spin: The first polarized proton collider

    International Nuclear Information System (INIS)

    Roser, T.

    1994-01-01

    The very successful program of QCD and electroweak tests at the high energy hadron colliders have shown that the perturbative QCD has progressed towards becoming a ''precision'' theory. At the same time, it has been shown that with the help of Siberian Snakes it is feasible to accelerate polarized protons to high enough energies where the proven methods of collider physics can be used to probe the spin content of the proton but also where fundamental tests of the spin effects in the standard model are possible. With Siberian Snakes the Relativistic Heavy Ion Collider (RHIC) will be the first collider to allow for 250 GeV on 250 GeV polarized proton collisions

  7. Note on polarized RHIC bunch arrangement

    International Nuclear Information System (INIS)

    Underwood, D.

    1996-01-01

    We discuss what combinations of bunch polarization in the two RHIC rings are necessary to do the physics measurements at various interaction regions. We also consider the bunches for both the pion inclusive and p-p elastic polarization measurements. Important factors to consider are the direction of the polarization with respect to the momentum in each bunch, the beam gas backgrounds, and the simulation of zero - polarization in one beam by averaging + and - helicity, and luminosity monitoring for normalization. These considerations can be addressed by setting the relative number of each of the 9 combinations possible at each of the 6 interaction regions. The combinations are (+ empty -) yellow X (+ empty -)blue, where yellow and blue are the counter-rotating rings

  8. RHIC 10 Hz global orbit feedback system

    International Nuclear Information System (INIS)

    Michnoff, R.; Arnold, L.; Carboni, L.; Cerniglia, P.; Curcio, A.; DeSanto, L.; Folz, C.; Ho, C.; Hoff, L.; Hulsart, R.; Karl, R.; Luo, Y.; Liu, C.; MacKay, W.; Mahler, G.; Meng, W.; Mernick, K.; Minty, M.; Montag, C.; Olsen, R.; Piacentino, J.; Popken, P.; Przybylinski, R.; Ptitsyn, V.; Ritter, J.; Schoenfeld, R.; Thieberger, P.; Tuozzolo, J.; Weston, A.; White, J.; Ziminski, P.; Zimmerman, P.

    2011-01-01

    Vibrations of the cryogenic triplet magnets at the Relativistic Heavy Ion Collider (RHIC) are suspected to be causing the horizontal beam perturbations observed at frequencies around 10 Hz. Several solutions to counteract the effect have been considered in the past, including a local beam feedback system at each of the two experimental areas, reinforcing the magnet base support assembly, and a mechanical servo feedback system. However, the local feedback system was insufficient because perturbation amplitudes outside the experimental areas were still problematic, and the mechanical solutions are very expensive. A global 10 Hz orbit feedback system consisting of 36 beam position monitors (BPMs) and 12 small dedicated dipole corrector magnets in each of the two 3.8 km circumference counter-rotating rings has been developed and commissioned in February 2011. A description of the system architecture and results with beam will be discussed.

  9. Experience with IBS-suppression lattice in RHIC

    International Nuclear Information System (INIS)

    Litvinenko, V.N.; Luo, Y.; Ptitsyn, V.; Satogata, T.; Tepikian, S.; Bai, M.; Bruno, D.; Cameron, P.; Connolly, R.; Della Penna, A.; Drees, A.; Fedotov, A.; Ganetis, G.; Hoff, L.; Louie, W.; Malitsky, N.; Marr, G.; Marusic, A.; Montag, C.; Pilat, F.; Roser, T.; Trbojevic, D.; Tsoupas, N.

    2008-01-01

    An intra-beam scattering (IBS) is the limiting factor of the luminosity lifetime for RHIC operating with heavy ions. In order to suppress the IBS we designed and implemented new lattice with higher betatron tunes. This lattice had been developed during last three years and had been used for gold ions in yellow ring of the RHIC during d-Au part of the RHIC Run-8. The use of this lattice allowed both significant increases in the luminosity lifetime and the luminosity levels via reduction of beta-stars in the IPS. In this paper we report on the development, the tests and the performance of IBS-suppression lattice in RHIC, including the resulting increases in the peak and the average luminosity. We also report on our plans for future steps with the IBS suppression

  10. Thermal and prompt photons at RHIC and the LHC

    Energy Technology Data Exchange (ETDEWEB)

    Paquet, Jean-François [Department of Physics & Astronomy, Stony Brook University, Stony Brook, NY 11794 (United States); Department of Physics, McGill University, 3600 University Street, Montreal, Quebec, H3A2T8 (Canada); Shen, Chun [Department of Physics, McGill University, 3600 University Street, Montreal, Quebec, H3A2T8 (Canada); Denicol, Gabriel [Department of Physics, McGill University, 3600 University Street, Montreal, Quebec, H3A2T8 (Canada); Physics Department, Brookhaven National Laboratory, Upton, NY 11973 (United States); Luzum, Matthew [Universidade de Santiago de Compostela, E-15706 Santiago de Compostela, Galicia-Spain (Spain); Universidade de São Paulo, Rua do Matão Travessa R, no. 187, 05508-090, Cidade Universitária, São Paulo (Brazil); Schenke, Björn [Physics Department, Brookhaven National Laboratory, Upton, NY 11973 (United States); Jeon, Sangyong; Gale, Charles [Department of Physics, McGill University, 3600 University Street, Montreal, Quebec, H3A2T8 (Canada)

    2016-12-15

    Thermal and prompt photon production in heavy ion collisions is evaluated and compared with measurements from both RHIC and the LHC. An event-by-event hydrodynamical model of heavy ion collisions that includes shear and bulk viscosities is used, along with up-to-date photon emission rates. Larger tension with measurements is observed at RHIC than at the LHC. The center-of-mass energy and centrality dependence of thermal and prompt photons is investigated.

  11. Polarized proton acceleration program at the AGS and RHIC

    International Nuclear Information System (INIS)

    Lee, Y.Y.

    1995-01-01

    Presented is an overview of the program for acceleration of polarized protons in the AGS and their injection into the RHIC collider. The problem of depolarizing resonances in strong focusing circulator accelerators is discussed. The intrinsic resonances are jumped over by the fast tune jump, and a partial Siberian Snake is used to compensate for over forty imperfection resonances in the AGS. Two sets of full Siberian Snake and spin rotators will be employed in RHIC

  12. MEASURING LOCAL GRADIENT AND SKEW QUADRUPOLE ERRORS IN RHIC IRS

    International Nuclear Information System (INIS)

    CARDONA, J.; PEGGS, S.; PILAT, R.; PTITSYN, V.

    2004-01-01

    The measurement of local linear errors at RHIC interaction regions using an ''action and phase'' analysis of difference orbits has already been presented [2]. This paper evaluates the accuracy of this technique using difference orbits that were taken when known gradient errors and skew quadrupole errors were intentionally introduced. It also presents action and phase analysis of simulated orbits when controlled errors are intentionally placed in a RHIC simulation model

  13. Polarization simulations in the RHIC run 15 lattice

    Energy Technology Data Exchange (ETDEWEB)

    Meot, F. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Huang, H. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Luo, Y. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Ranjbar, V. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Robert-Demolaize, G. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; White, S. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.

    2015-05-03

    RHIC polarized proton Run 15 uses a new acceleration ramp optics, compared to RHIC Run 13 and earlier runs, in relation with electron-lens beam-beam compensation developments. The new optics induces different strengths in the depolarizing snake resonance sequence, from injection to top energy. As a consequence, polarization transport along the new ramp has been investigated, based on spin tracking simulations. Sample results are reported and discussed.

  14. Tracking studies in eRHIC energy-recovery recirculator

    Energy Technology Data Exchange (ETDEWEB)

    Meot, F. [Brookhaven National Lab. (BNL), Upton, NY (United States); Brooks, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ptitsyn, V. [Brookhaven National Lab. (BNL), Upton, NY (United States); Trbojevic, D. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tsoupas, N. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-07-13

    Beam and polarization tracking studies in eRHIC energy recovery electron recirculator are presented, based on a very preliminary design of the FFAG lattice. These simulations provide examples of some of the beam and spin optics aspects of the linear FFAG lattice concept and its application in eRHIC, they provide code benchmarking for synchrotron radiation and spin diffusion in addition, and pave the way towards end-to-end 6-D(phasespace)+3D(spin) tracking simulations.

  15. SYNTHESIZER CONTROLLED BEAM TRANSFER FROM THE AGS TO RHIC

    International Nuclear Information System (INIS)

    DELONG, J.; BRENNAN, J.M.; FISCHER, W.; HAYES, T.; SMITH, K.; VALENTINO, S.

    2001-01-01

    To ensure minimal losses and to preserve longitudinal emittance, beam is transferred from the AGS to the RHIC bunch to bucket. This requires precision frequency and phase control for synchronization and kicker timing. The required precision is realized with a set of Direct Digital Synthesizers. Each synthesizer can be frequency and phase modulated to align the AGS bunch to the target bucket in the RHIC phase

  16. Tritium toxicity program in the Medical Department, Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Carsten, A.L.

    1983-01-01

    It is possible to detect somatic, cytogenetic and genetic effects resulting from exposures at 33 to 100 times the mpc's for tritiated water (HTO). The reduction in bone marrow cells in animals maintaining normal total cellularity demonstrate both the presence of an effect at the primitive cell level as well as the animal's ability to compensate for this effect by recruiting stem cells from the G 0 resting state. This evidence of damage together with the observed cytogenetic changes leads one to contemplate the possible importance of radiation exposures at these levels for the induction of leukemia or other blood dyscrasias. As predicted on the basis of established principles of radiobiology, exposure to tritium beta rays from HTO ingestion results in measureable effects on several animal systems

  17. Brookhaven National Laboratory technology transfer report, fiscal year 1986

    International Nuclear Information System (INIS)

    1986-01-01

    An increase in the activities of the Office of Research and Technology Applications (ORTA) is reported. Most of the additional effort has been directed to the regional electric utility initiative, but intensive efforts have been applied to the commercialization of a compact synchrotron storage ring for x-ray lithography applications. At least six laboratory technologies are reported as having been transferred or being in the process of transfer. Laboratory accelerator technology is being applied to study radiation effects, and reactor technology is being applied for designing space reactors. Technologies being transferred and emerging technologies are described. The role of the ORTA and the technology transfer process are briefly described, and application assessment records are given for a number of technologies. A mini-incubator facility is also described

  18. 1994 annual report for Brookhaven National Laboratory. Revision 2

    International Nuclear Information System (INIS)

    1994-01-01

    Epidemiologic surveillance at DOE facilities consists of regular and systematic collection, analysis, and interpretation of data on absences due to illness and injury in the work force. Its purpose is to provide an early warning system for health problems occurring among employees at participating sites. Data are collected by coordinators at each site and submitted to the Epidemiologic Surveillance Data Center, located at the Oak Ridge Institute for Science and Education, where quality control procedures and analyses are carried out. Rates of absences and rates of diagnoses associated with absences are analyzed by occupation and other relevant variables. They may be compared with the disease experience of different groups within the DOE work force and with populations that do not work for DOE to identify disease patterns or clusters that may be associated with work activities. This amended annual report corrects errors in the initial release of the BNL report for 1994. In this annual report, the 1994 morbidity data for BNL are summarized

  19. Brookhaven National Laboratory technology transfer report, fiscal year 1986

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    An increase in the activities of the Office of Research and Technology Applications (ORTA) is reported. Most of the additional effort has been directed to the regional electric utility initiative, but intensive efforts have been applied to the commercialization of a compact synchrotron storage ring for x-ray lithography applications. At least six laboratory technologies are reported as having been transferred or being in the process of transfer. Laboratory accelerator technology is being applied to study radiation effects, and reactor technology is being applied for designing space reactors. Technologies being transferred and emerging technologies are described. The role of the ORTA and the technology transfer process are briefly described, and application assessment records are given for a number of technologies. A mini-incubator facility is also described. (LEW)

  20. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Paquette, D.; Lee, R. [and others

    1996-10-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  1. Operational status of the Brookhaven National Laboratory Accelerator Test Facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Ben-Zvi, I.; Fernow, R.C.; Fischer, A.S.; Gallardo, J.; Jialin, Xie; Kirk, H.G.; Malone, R.G.; Parsa, Z.; Palmer, R.B.; Rao, T.; Rogers, J.; Sheehan, J.; Tsang, T.Y.F.; Ulc, S.; van Steenbergen, A.; Woodle, M.; Zhang, R.S.; Bigio, I.; Kurnit, N.; Shimada, T.; McDonald, K.T.; Russel, D.P.; Jiang, Z.Y.; Pellegrini, C.; Wang, X.J.

    1990-01-01

    Initial design parameters and early operational results of a 50 MeV high brightness electron linear accelerator are described. The system utilizes a radio frequency electron gun operating at a frequency of 2.856 GHz and a nominal output energy of 4.5 MeV followed by two, 2π/3 mode, disc loaded, traveling wave accelerating sections. The gun cathode is photo excited with short (6 psec) laser pulses giving design peak currents of a few hundred amperes. The system will be utilized to carry out infra-red FEL studies and investigation of new high gradient accelerating structures

  2. Brookhaven National Laboratory meteorological services instrument calibration plan and procedures

    Energy Technology Data Exchange (ETDEWEB)

    Heiser, John [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2013-02-16

    This document describes the Meteorological Services (Met Services) Calibration and Maintenance Schedule and Procedures, The purpose is to establish the frequency and mechanism for the calibration and maintenance of the network of meteorological instrumentation operated by Met Services. The goal is to maintain the network in a manner that will result in accurate, precise and reliable readings from the instrumentation.

  3. Building Magnets at Brookhaven National Laboratory: A Condensed Account

    Science.gov (United States)

    Willen, Erich

    2017-09-01

    The development of superconducting wire and cable in the late twentieth century enabled high-field magnets and thus much higher beam-collision energies in accelerators. These higher collision energies have allowed experimentalists to probe further into the structure of matter at the most fundamental, subatomic level. The behavior of the early universe, where these high energies prevailed, and its evolution over time are the realm their experiments seek to investigate. The subject has aroused the curiosity of the public as well as scientists and has facilitated the support needed to build and operate such expensive machines and experiments. The path forward has not been easy, however. Success in most projects has been mixed with failure, progress with ineptitude. The building of high energy accelerators is mostly a story of capable people doing their best to develop new and unusual technology toward some defined goal, facing both success and failure along the way. It is also a story of administrative imperatives that had unpredictable effects on a project's success, depending mostly on the people in the administrative roles and the decisions that they made.

  4. Building Magnets at Brookhaven National Laboratory - An Account

    Energy Technology Data Exchange (ETDEWEB)

    Willen, E. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-02-01

    The development of superconducting wire and cable in the late 20th century enabled high field magnets and thus much higher beam collision energies in accelerators. These higher collision energies have allowed experiments to probe further into the structure of matter at the most fundamental, subatomic level. The behavior of the early universe, where these high energies prevailed, and its evolution over time are what these experiments seek to investigate. The subject has aroused the curiosity of not only scientists but of the public as well and has facilitated the support needed to build and operate such expensive machines and experiments. The path forward has not been easy, however. Success in most projects has been mixed with failure, progress with ineptitude. The building of high energy accelerators is mostly a story of capable people doing their best to develop new and unusual technology toward some defined goal, with success and failure in uneven measure along the way. It is also a story of administrative imperatives that have had unpredictable effects on a project’s success, depending mostly on the people in the administrative roles and the decisions that they have made.

  5. Wildland Fire Management Plan for Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Schwager, K.; Green, T. M.

    2014-01-01

    The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildland fire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.

  6. Brookhaven National Laboratory, Upton, New York final environmental impact statement

    International Nuclear Information System (INIS)

    Liverman, J.L.

    1977-07-01

    Generally, data used for the statement were those which had been accumulated through the calendar year 1973. Since 1973, Environmental Monitoring Reports have been published for calendar years 1974 and 1975. A review of these more recent documents reveals that the data contained therein lead to no significant change in the conclusions drawn in this Environmental Impact Statement. Past Laboratory operations were considered only insofar as they contribute to continuing environmental impacts. Environmental effects were considered solely with respect to off-site consequences, the only exception being those cases where on-site effects have had or will have an impact on the long-term productivity of the Laboratory site

  7. Brookhaven National Laboratory site environmental report for calendar year 1989

    International Nuclear Information System (INIS)

    Miltenberger, R.P.; Royce, B.A.; Chalasani, S.S.; Morganelli, D.; Naidu, J.R.

    1990-12-01

    The environmental monitoring program is conducted by the Environmental Protection Section of the Safety and Environmental Protection (S ampersand EP) Division to determine whether operation of BNL facilities have met the applicable environmental standards and effluent control requirements. This program includes monitoring for both radiological and nonradiological parameters. This report summarizes the data for the external radiation levels; radioactivity in air, rain, potable water, surface water, ground water, soil, vegetation, and aquatic biota; water quality, metals, organics and petroleum products in ground water, surface water and potable water. Analytical results are reviewed by the S ampersand EP staff and when required by permit conditions are transmitted to the appropriate regulatory agencies. The data were evaluated using the appropriate environmental regulatory criteria. Detailed data for the calendar year 1989 are presented. 27 figs

  8. 2006 Brookhaven National Laboratory Annual Illness and Injury Surveillance Report

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Health, Office of Health and Safety, Office of Illness and Injury Prevention Programs

    2008-03-06

    The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of illness and injury surveillance activities that provide an early warning system to detect health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence, occupational injuries and illnesses, and disabilities and deaths among current workers.

  9. 2007 Brookhaven National Laboratory Annual Illness and Injury Surveillance Report

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Health, Office of Health and Safety, Office of Illness and Injury Prevention Programs

    2008-07-31

    The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of illness and injury surveillance activities that provide an early warning system to detect health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence, occupational injuries and illnesses, and disabilities and deaths among current workers.

  10. 2009 Brookhaven National Laboratory Annual Illness and Injury Surveillance Report

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Health and Safety, Office of Illness and Injury Prevention Programs

    2010-11-24

    The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  11. 2008 Brookhaven National Laboratory Annual Illness and Injury Surveillance Report

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Health and Safety, Office of Illness and Injury Prevention Programs

    2009-12-10

    The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  12. 2010 Brookhaven National Laboratory Annual Illness and Injury Surveillance Report

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Health, Office of Health and Safety, Office of Illness and Injury Prevention Programs

    2011-08-16

    The U.S. Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of illness and injury surveillance activities that provide an early warning system to detect health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence, occupational injuries and illnesses, and disabilities and deaths among current workers.

  13. Operation of the Brookhaven national laboratory accelerator test facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Ben-Zvi, I.; Botke, I.; Chou, T.S.; Fernow, R.; Fischer, J.; Fisher, A.; Gallardo, J.; Ingold, G.; Malone, R.; Palmer, R.; Parsa, Z.; Pogorelsky, I.; Rogers, J.; Sheehan, J.; Srinivasan-Rao, T.; Tsang, T.; Ulc, S.; Van Steenbergen, A.; Wang, X.J.; Woodle, M.; Yu, L.H.

    1992-01-01

    Early operation of the 50 MeV high brightness electron linac of the Accelerator Test Facility is described along with experimental data. This facility is designed to study new linear acceleration techniques and new radiation sources based on linacs in combination with free electron lasers. The accelerator utilizes a photo-excited, metal cathode, radio frequency electron gun followed by two travelling wave accelerating sections and an Experimental Hall for the study program. (Author) 5 refs., 4 figs., tab

  14. Operation of the Brookhaven National Laboratory Accelerator Test Facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Ben-Zvi, I.; Botke, I.; Chou, T.S.; Fernow, R.; Fischer, J.; Fisher, A.; Gallardo, J.; Ingold, G.; Malone, R.; Palmer, R.; Parsa, Z.; Pogorelsky, I.; Rogers, J.; Sheehan, J.; Srinivasan-Rao, T.; Tsang, T.; Ulc, S.; van Steenbergen, A.; Wang, X.J.; Woodle, M.; Yu, L.H.

    1992-01-01

    Early operation of the 50 MeV high brightness electron linac of the Accelerator Test Facility is described along with experimental data. This facility is designed to study new linear acceleration techniques and new radiation sources based on linacs in combination with free electron lasers. The accelerator utilizes a photo-excited, metal cathode, radio frequency electron gun followed by two travelling wave accelerating sections and an Experimental Hall for the study program

  15. Operational status of the Brookhaven National Laboratory Accelerator Test Facility

    International Nuclear Information System (INIS)

    Batchelor, K.; Ben-Zvi, I.; Chou, T.S.; Los Alamos National Lab., NM; Princeton Univ., NJ

    1989-01-01

    Design and operation of a 50 MeV Electron Linear Accelerator utilizing a low emittance (γ var epsilon = 5 to 10 mm-mrad) radio frequency gun operating at an output energy of 5 MeV and a charge of 1 nC is described. Design calculations and early radio frequency measurements and operational experience with the electron gun utilizing a dummy copper cathode in place of the proposed photocathode emitter are given. 6 refs., 9 figs., 1 tab

  16. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    International Nuclear Information System (INIS)

    Naidu, J.R.; Paquette, D.; Lee, R.

    1996-01-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities

  17. Amended annual report for Brookhaven National Laboratory: Epidemiologic surveillance - 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    Epidemiologic surveillance at DOE facilities consists of regular and systematic collection, analysis, and interpretation of data on absences due to illness and injury in the work force. Its purpose is to provide an early warning system for health problems occurring among employees at participating sites. Data are collected by coordinators at each site and submitted to the Epidemiologic Surveillance Data Center, located at the Oak Ridge Institute for Science and Education, where quality control procedures and analyses are carried out. Rates of absences and rates of diagnoses associated with absences are analyzed by occupation and other relevant variables. They may be compared with the disease experience of different groups within the DOE work force and with populations and do not work for DOE to identify disease patterns or clusters that may be associated work activities. This report provides a final summary for BNL.

  18. Wildland Fire Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K.; Green, T. M.

    2014-10-01

    The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildland fire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.

  19. Vertical velocity variances and Reynold stresses at Brookhaven

    DEFF Research Database (Denmark)

    Busch, Niels E.; Brown, R.M.; Frizzola, J.A.

    1970-01-01

    Results of wind tunnel tests of the Brookhaven annular bivane are presented. The energy transfer functions describing the instrument response and the numerical filter employed in the data reduction process have been used to obtain corrected values of the normalized variance of the vertical wind v...

  20. Brookhaven highlights, October 1978-September 1979. [October 1978 to September 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    These highlights present an overview of the major research and development achievements at Brookhaven National Laboratory from October 1978 to September 1979. Specific areas covered include: accelerator and high energy physics programs; high energy physics research; the AGS and improvements to the AGS; neutral beam development; heavy ion fusion; superconducting power cables; ISABELLE storage rings; the BNL Tandem accelerator; heavy ion experiments at the Tandem; the High Flux Beam Reactor; medium energy physics; nuclear theory; atomic and applied physics; solid state physics; neutron scattering studies; x-ray scattering studies; solid state theory; defects and disorder in solids; surface physics; the National Synchrotron Light Source ; Chemistry Department; Biology Department; Medical Department; energy sciences; environmental sciences; energy technology programs; National Center for Analysis of Energy Systems; advanced reactor systems; nuclear safety; National Nuclear Data Center; nuclear materials safeguards; Applied Mathematics Department; and support activities. (GHT)

  1. Offloading peak processing to virtual farm by STAR experiment at RHIC

    International Nuclear Information System (INIS)

    Balewski, Jan; Walker, Matt; Lauret, Jerome; Arkhipkin, Dmitry; Olson, Doug; Sakrejda, Iwona; Porter, Jeff; Bresnahan, John; Keahey, Kate; Stevens, Justin

    2012-01-01

    The Virtual Machine framework was used to assemble the STAR-computing environment, validated once, deployed on over 100 8-core VMs at NERSC and Argonne National Lab, and used as a homogeneous Virtual Farm processing events acquired in real time by STAR detector located at Brookhaven National Lab. To provide time dependent calibration, a database snapshot scheme was devised. The two high capacity filesystems, localized at the opposite coasts of US and interconnected via Globus-Online protocol, were used in this setup, which resulted with a highly scalable Cloud-based extension of STAR computing resources. The system was in continuous operation for over 3 months.

  2. Exciting first results from deuteron-gold collisions at Brookhaven

    CERN Multimedia

    2003-01-01

    "The latest results from the Relativistic Heavy Ion Collider, the world's most powerful facility for nuclear physics research, strengthen scientists' confidence that RHIC collisions of gold ions have created unusual conditions and that they are on the right path to discover a form of matter called the quark-gluon plasma, believed to have existed in the first microseconds after the birth of the universe" (1 page).

  3. Polarized proton parameters for the 2015 PP-on-Au setup in RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Gardner, C. J. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-08-25

    Values are given for RHIC circumference shifts due to snakes for various situations. Relevant parameters are tabulated for polarized protons (PP) in the booster and in AGS and RHIC for PP-on-Au stores.

  4. Polarized proton parameters for the 2015 PP-on-Aluminum setup in RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Gardner, C. J. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-10-02

    Values are given for RHIC circumference shifts due to snakes for various situations. Relevant parameters are tabulated for polarized protons (PP) in the booster and in AGS and RHIC for PP-on-Aluminum stores.

  5. Prospects for polarization at RHIC and SSC

    International Nuclear Information System (INIS)

    Lee, S.Y.

    1991-01-01

    In low to medium energy accelerators, betatron tune jumps and vertical orbit harmonic correction methods have been used to overcome the intrinsic and imperfection resonances. At high energy accelerators, snakes are needed to preserve polarization. We analyze the effects of snake resonances, snake imperfections overlapping resonances on the spin depolarization. We discuss also results of recent snake experiments at the IUCF Cooler Ring. The snake can overcome various kinds of spin depolarization resonances. These experiments pointed out further that partial snake can be used to cure the imperfection resonances in low to medium energy accelerators. We also examine various snake designs. A new generalized snake concept allows for two possible configurations. The compact configuration offers the advantages of shorter total snake length and smaller horizontal orbit displacement. The split snake configuration allows for dual functions of a snake and a 90 degree spin rotator at the mid-section of the snake, which provides helicity state collisions. The requirements for obtaining high luminosity polarized protons at high energy colliders, such as RHIC and SSC, are reviewed

  6. Strangeness by Thermal Model Simulation at RHIC

    Institute of Scientific and Technical Information of China (English)

    SHI Xing-Hua; MA Yu-Gang; CAI Xiang-Zhou; CHEN Jin-Hui; MA Guo-Liang; ZHONG Chen

    2009-01-01

    The local temperature effect on strangeness enhancement in relativistic heavy ion collisions is discussed in the framework of the thermal model in which the K+ /h+ ratio becomes smaller with increasing freeze-out temperature.Considering that most strangeness particles of final-state particles are from the kaon meson,the temperature effect may play a role in strangeness production in hot dense matter where a slightly different temperature distribution in different areas could be produced by jet energy loss.This phenomenon is predicted by thermal model calculation at RHIC energy.The Ε-/φ ratio in central Au+Au collisions at 200 GeV from the thermal model depends on the freeze-out temperature obviously when γs is different.It should be one of the reasons why strangeness enhancements of Ε and φ are different though they include two strange quarks.These results indicate that thermodynamics is an important factor for strangeness production and the strangeness enhancement phenomenon.

  7. Hadron spectroscopy at RHIC and KAON

    International Nuclear Information System (INIS)

    Chung, S.U.

    1990-01-01

    A description is given of the physics opportunities at RHIC regarding quark-gluon spectroscopy. The basic idea is to isolate with appropriate triggers the sub-processes pomeron + pomeron → hadrons and γ + +γ + → hadrons with the net effective mass of hadrons in the range of 1.0 to 10.0 GeV, in order to study the hadronic states composed of u, d, c, b and gluons. The double-pomeron interactions are expected to produce glueballs and hybrids preferentially, while the two-offshell-photon initial states should couple predominantly to quarkonia and multiquark states. Of particular interest is the possibility of carrying out a CP-violation study in the B decays. The KAON facility, proposed for TRIUMF, Vancouver, Canada, is an intense hadron factory with a proton flux some 25 times higher than that available at the BNL AGS with the Booster. Therefore, a general purpose hadron spectrometer will be able to tackle the problem of studying gluonic and multiquark degrees of freedom in strangeonia. 19 refs., 3 figs

  8. Is Overeating Behavior Similar to Drug Addiction? (427th Brookhaven Lecture)

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Gene-Jack

    2007-09-27

    The increasing number of obese individuals in the U.S. and other countries world-wide adds urgency to the need to understand the mechanisms underlying pathological overeating. Research by the speaker and others at Brookhaven National Laboratory and elsewhere is compiling evidence that the brain circuits disrupted in obesity are similar to those involved in drug addiction. Using positron emission tomography (PET), the speaker and his colleagues have implicated brain dopamine in the normal and the pathological intake of food by humans. During the 427th Brookhaven Lecture, speaker will review the findings and implications of PET studies of obese subjects and then compare them to PET research involving drug-addicted individuals. For example, in pathologically obese subjects, it was found that reductions in striatal dopamine D2 receptors are similar to those observed in drug-addicted subjects. The speaker and his colleagues have postulated that decreased levels of dopamine receptors predisposed subjects to search for strongly rewarding reinforcers, be it drugs for the drug-addicted or food for the obese, as a means to compensate for decreased sensitivity of their dopamine-regulated reward circuits. As the speaker will summarize, multiple but similar brain circuits involved in reward, motivation, learning and inhibitory control are disrupted both in drug addiction and obesity, resulting in the need for a multimodal approach to the treatment of obesity.

  9. Is Overeating Behavior Similar to Drug Addiction? (427th Brookhaven Lecture)

    International Nuclear Information System (INIS)

    Wang, Gene-Jack

    2007-01-01

    The increasing number of obese individuals in the U.S. and other countries world-wide adds urgency to the need to understand the mechanisms underlying pathological overeating. Research by the speaker and others at Brookhaven National Laboratory and elsewhere is compiling evidence that the brain circuits disrupted in obesity are similar to those involved in drug addiction. Using positron emission tomography (PET), the speaker and his colleagues have implicated brain dopamine in the normal and the pathological intake of food by humans. During the 427th Brookhaven Lecture, speaker will review the findings and implications of PET studies of obese subjects and then compare them to PET research involving drug-addicted individuals. For example, in pathologically obese subjects, it was found that reductions in striatal dopamine D2 receptors are similar to those observed in drug-addicted subjects. The speaker and his colleagues have postulated that decreased levels of dopamine receptors predisposed subjects to search for strongly rewarding reinforcers, be it drugs for the drug-addicted or food for the obese, as a means to compensate for decreased sensitivity of their dopamine-regulated reward circuits. As the speaker will summarize, multiple but similar brain circuits involved in reward, motivation, learning and inhibitory control are disrupted both in drug addiction and obesity, resulting in the need for a multimodal approach to the treatment of obesity.

  10. Brookhaven Reactor Experiment Control Facility, a distributed function computer network

    International Nuclear Information System (INIS)

    Dimmler, D.G.; Greenlaw, N.; Kelley, M.A.; Potter, D.W.; Rankowitz, S.; Stubblefield, F.W.

    1975-11-01

    A computer network for real-time data acquisition, monitoring and control of a series of experiments at the Brookhaven High Flux Beam Reactor has been developed and has been set into routine operation. This reactor experiment control facility presently services nine neutron spectrometers and one x-ray diffractometer. Several additional experiment connections are in progress. The architecture of the facility is based on a distributed function network concept. A statement of implementation and results is presented

  11. Brookhaven highlights, July 1976-September 1978

    International Nuclear Information System (INIS)

    1979-11-01

    Some of the most significant research accomplishments during this 27-month period are presented. Although some data are given, this report is primarily descriptive in outlook; detailed information on completed work should be sought from the references cited herein or from the usual sources of physics research information. The report is organized as follows: High-energy Physics (general introduction, physics research, accelerators, ISABELLE); Nuclear and Solid State Physics, and Chemistry; Life Sciences (biology, medicine); Applied Energy Science (energy and the environment, reactor systems and safety, National Nuclear Data Center, nuclear materials safeguards); Support Activities (applied mathematics, instrumentation, reactors, safety and environmental protection); and General and Administrative. 117 figures, 16 tables, 315 references

  12. Illuminating RHIC matter with the multi-purpose direct photon

    International Nuclear Information System (INIS)

    Frantz, Justin

    2007-01-01

    In the RHIC era, the use of direct photon physics to probe heavy ion collisions has developed beyond its original scope. I make evaluations of the current state of several measurements by RHIC experiments and their associated physics implications, with a focus on their current and desired precision. At low p T , thermal photon theory is still not well constrained by the data, but improvements are on the way. At higher p T , we have been able to gain important insights, now with regards to the proposed 'jet-medium' photon sources (Fries, Muller and Srivastava 2003 Phys. Rev. Lett. 90 132301 (Preprint nucl-th/0208001); Zakharov 2004 JETP Lett. 80 617). Such predictions, as they currently exist, seem to be disfavoured by the PHENIX data; however, the idea is probably not ruled out. Finally, direct γ-jet correlations have been measured for the first time at RHIC and already show hints of medium modification

  13. The RHIC/AGS Online Model Environment: Design and Overview

    International Nuclear Information System (INIS)

    Satogata, T.; Brown, K.; Pilat, F.; Tafti Alai, A.; Tepikian, S.; Vanzeijtz

    1999-01-01

    An integrated online modeling environment is currently under development for use by AGS and RHIC physicists and commissioners. This environment combines the modeling efforts of both groups in a CDEV[1] client-server design, providing access to expected machine optics and physics parameters based on live and design machine settings. An abstract modeling interface has been designed as a set of adapters[2] around core computational modeling engines such as MAD and UAL/Teapot++[3]. This approach allows us to leverage existing survey, lattice, and magnet infrastructure, as well as easily incorporate new model engine developments. This paper describes the architecture of the RHIC/AGS modeling environment, including the application interface through CDEV and general tools for graphical interaction with the model using Tcl/Tk. Separate papers at this conference address the specifics of implementation and modeling experience for AGS and RHIC

  14. The RHIC polarized H{sup −} ion source

    Energy Technology Data Exchange (ETDEWEB)

    Zelenski, A., E-mail: zelenski@bnl.gov; Atoian, G.; Raparia, D.; Ritter, J.; Steski, D. [Brookhaven National Laboratory, Upton, New York 11973 (United States)

    2016-02-15

    A novel polarization technique had been successfully implemented for the Relativistic Heavy Ion Collider (RHIC) polarized H{sup −} ion source upgrade to higher intensity and polarization. In this technique, a proton beam inside the high magnetic field solenoid is produced by ionization of the atomic hydrogen beam (from external source) in the He-gaseous ionizer cell. Further proton polarization is produced in the process of polarized electron capture from the optically pumped Rb vapor. The use of high-brightness primary beam and large cross sections of charge-exchange cross sections resulted in production of high intensity H{sup −} ion beam of 85% polarization. The source very reliably delivered polarized beam in the RHIC Run-2013 and Run-2015. High beam current, brightness, and polarization resulted in 75% polarization at 23 GeV out of Alternating Gradient Synchrotron (AGS) and 60%-65% beam polarization at 100-250 GeV colliding beams in RHIC.

  15. Report of the stochastic cooling subgroup of the RHIC workshop

    International Nuclear Information System (INIS)

    Boussard, D.; Claus, J.; DiMassa, G.; Marriner, J.; Milutinovic, J.; Shafer, R.

    1988-01-01

    We have considered the possibility of stochastic cooling of beams for the RHIC collider. Similar studies have been carried out previously for RHIC and other bunched beam proton machines. The major motivation for cooling at RHIC is to stabilize the growth from intrabeam scattering. We find that cooling rates of the order of 500 sec are theoretically possible for beams of gold ions with γ = 100 if a cooling bandwidth of 10 GHz is used. However, the amount of microwave power which is required is large for momentum cooling and probably not practical. Considerably less power is required for slower rates. We believe that cooling times of 5000 sec for momentum cooling and 1000 sec for betatron cooling might be possible. 5 refs

  16. Transverse impedance measurement in RHIC and the AGS

    Energy Technology Data Exchange (ETDEWEB)

    Biancacci, Nicolo [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Blaskiewicz, M. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Dutheil, Y. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Liu, C. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Mernick, M. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Minty, M. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; White, S. M. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.

    2014-05-12

    The RHIC luminosity upgrade program aims for an increase of the polarized proton luminosity by a factor 2. To achieve this goal a significant increase in the beam intensity is foreseen. The beam coupling impedance could therefore represent a source of detrimental effects for beam quality and stability at high bunch intensities. For this reason it is essential to quantify the accelerator impedance budget and the major impedance sources, and possibly cure them. In this MD note we summarize the results of the 2013 transverse impedance measurements in the AGS and RHIC. The studies have been performed measuring the tune shift as a function of bunch intensity and deriving the total accelerator machine transverse impedance. For RHIC, we could obtain first promising results of impedance localization measurements as well.

  17. Spin tune dependence on closed orbit in RHIC

    International Nuclear Information System (INIS)

    Ptitsyn, V.; Bai, M.; Roser, T.

    2010-01-01

    Polarized proton beams are accelerated in RHIC to 250 GeV energy with the help of Siberian Snakes. The pair of Siberian Snakes in each RHIC ring holds the design spin tune at 1/2 to avoid polarization loss during acceleration. However, in the presence of closed orbit errors, the actual spin tune can be shifted away from the exact 1/2 value. It leads to a corresponding shift of locations of higher-order ('snake') resonances and limits the available betatron tune space. The largest closed orbit effect on the spin tune comes from the horizontal orbit angle between the two snakes. During RHIC Run in 2009 dedicated measurements with polarized proton beams were taken to verify the dependence of the spin tune on the local orbits at the Snakes. The experimental results are presented along with the comparison with analytical predictions.

  18. Opportunities for Drell-Yan Physics at RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Aschenauer, E.; Bland, L.; Crawford, H.; Goto, Y.; Eyser, O.; Kang, Z.; Vossen, A.

    2011-05-24

    Drell-Yan (DY) physics gives the unique opportunity to study the parton structure of nucleons in an experimentally and theoretically clean way. With the availability of polarized proton-proton collisions and asymmetric d+Au collisions at the Relativistic Heavy Ion Collider (RHIC), we have the basic (and unique in the world) tools to address several fundamental questions in QCD, including the expected gluon saturation at low partonic momenta and the universality of transverse momentum dependent parton distribution functions. A Drell-Yan program at RHIC is tied closely to the core physics questions of a possible future electron-ion collider, eRHIC. The more than 80 participants of this workshop focused on recent progress in these areas by both theory and experiment, trying to address imminent questions for the near and mid-term future.

  19. RHIC beam permit and quench detection communications system

    International Nuclear Information System (INIS)

    Conkling, C.R. Jr.

    1997-01-01

    A beam permit module has been developed to concentrate RHIC, subsystem sensor outputs, permit beam, and initiate emergency shutdowns. The modules accept inputs from the vacuum, cryogenic, power supply, beam loss, and superconducting magnet quench detection systems. Modules are located at equipment locations around the RHIC ring. The modules are connected by three fiberoptic communications links; a beam permit link, and two magnet power supply interlock links. During operation, carrier presence allows beam. If a RHIC subsystem detects a fault, the beam permit carrier terminates - initiating a beam dump. If the fault was a superconducting magnet quench, a power supply interlock carrier terminates - initiating an emergency magnet power dump. In addition, the master module triggers an event to cause remote sensors to log and hold data at the time-of-failure

  20. Preparing accelerator systems for the RHIC sextant commissioning

    International Nuclear Information System (INIS)

    Trbojevic, D.; Pilat, F.; Ahrens, L.

    1997-01-01

    The Relativistic Heavy Ion Collider (RHIC) construction is progressing steadily towards completion in 1999 when beams will circulate in both collider rings. One of the major tests of the RHIC project was the commissioning of the first sextant with gold ion beams in early 1997. This is a report on preparation of the RHIC accelerator systems for the first sextant test. It includes beam position monitors, timing, injection correction through the magnetic septum and kickers, current transformers, flags and the ionization beam profile monitors, beam loss monitors, beam and quench permit link system, power supply controls, and the configuration database system. The software and hardware development and coordination of the different systems before commissioning were regularly checked during bi-weekly, and (later) weekly, progress report meetings