Sample records for revision environmental restoration

  1. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-20

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D&D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities.

  2. Environmental Restoration

    Energy Technology Data Exchange (ETDEWEB)

    Zeevaert, T.; Vanmarcke, H

    1998-07-01

    The objectives of SCK-CEN's programme on environmental restoration are (1) to optimize and validate models for the impact assessment from environmental, radioactive contaminations, including waste disposal or discharge; (2) to support the policy of national authorities for public health and radioactive waste management. Progress and achievements in 1997 are reported.

  3. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-22

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  4. Draft Waste Management Programmatic Environmental Impact Statement for managing treatment, storage, and disposal of radioactive and hazardous waste. Volume 3, Appendix A: Public response to revised NOI, Appendix B: Environmental restoration, Appendix C, Environmental impact analysis methods, Appendix D, Risk

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    Volume three contains appendices for the following: Public comments do DOE`s proposed revisions to the scope of the waste management programmatic environmental impact statement; Environmental restoration sensitivity analysis; Environmental impacts analysis methods; and Waste management facility human health risk estimates.

  5. Environmental Restoration Program quality system requirements for the Hanford Site. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Cote, R.F.

    1993-11-01

    This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment.

  6. Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

  7. Basic research for environmental restoration

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    The Department of Energy (DOE) is in the midst of a major environmental restoration effort to reduce the health and environmental risks resulting from past waste management and disposal practices at DOE sites. This report describes research needs in environmental restoration and complements a previously published document, DOE/ER-0419, Evaluation of Mid-to-Long Term Basic Research for Environmental Restoration. Basic research needs have been grouped into five major categories patterned after those identified in DOE/ER-0419: (1) environmental transport and transformations; (2) advanced sampling, characterization, and monitoring methods; (3) new remediation technologies; (4) performance assessment; and (5) health and environmental effects. In addition to basic research, this document deals with education and training needs for environmental restoration. 2 figs., 6 tabs.

  8. Environmental, Safety, and Health Plan for the remedial investigation/feasibility study at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Revision 1, Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Davis, C. M.; El-Messidi, O. E.; Cowser, D. K.; Kannard, J. R.; Carvin, R. T.; Will, III, A. S.; Clark, Jr., C.; Garland, S. B.

    1993-05-01

    This Environmental, Safety, and Health (ES&H) Plan presents the concepts and methodologies to be followed during the remedial investigation/feasibility study (RI/FS) for Oak Ridge National Laboratory (ORNL) to protect the health and safety of employees, the public, and the environment. This ES&H Plan acts as a management extension for ORNL and Martin Marietta Energy Systems, Inc. (Energy Systems) to direct and control implementation of the project ES&H program. The subsections that follow describe the program philosophy, requirements, quality assurance measures, and methods for applying the ES&H program to individual waste area grouping (WAG) remedial investigations. Hazardous work permits (HWPs) will be used to provide task-specific health and safety requirements.

  9. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada Test Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-12-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. The Test Cell C (TCC) Facility is located in Area 25 of the Nevada Test Site (NTS) approximately 25 miles northwest of Mercury, Nevada (Figure 1). CAU 116 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) of 1996 (as amended February 2008) and consists of two Corrective Action Sites (CASs): (1) CAS 25-23-20, Nuclear Furnace Piping; and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 is described in the FFACO as the TCC Facility but actually includes Building 3210 and attached concrete shield wall only. CAU 116 will be closed by demolishing Building 3210, the attached concrete shield wall, and the nuclear furnace piping. In addition, as a best management practice (BMP), Building 3211 (moveable shed) will be demolished due to its close proximity to Building 3210. This will aid in demolition and disposal operations. Radiological surveys will be performed on the demolition debris to determine the proper disposal pathway. As much of the demolition debris as space allows will be placed into the Building 3210 basement structure. After filling to capacity with demolition debris, the basement structure will be mounded or capped and closed with administrative controls. Prior to beginning demolition activities and according to an approved Sampling and Analysis Plan (SAP), representative sampling of surface areas that are known, suspected, or have the potential to contain hazardous constituents such as lead or polychlorinated biphenyls (PCBs) will be performed throughout all buildings and structures. Sections 2.3.2, 4.2.2.2, 4.2.2.3, 4.3, and 6.2.6.1 address the methodologies employed that assure the solid debris placed in the basement structure will not contain contaminants of concern (COCs) above hazardous waste levels. The anticipated post

  10. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 124: Storage Tanks, Nevada Test Site, Nevada (Draft), Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2007-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses closure for Corrective Action Unit (CAU) 124, Areas 8, 15, and 16 Storage Tanks, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 124 consists of five Corrective Action Sites (CASs) located in Areas 8, 15, and 16 of the Nevada Test Site as follows: • 08-02-01, Underground Storage Tank • 15-02-01, Irrigation Piping • 16-02-03, Underground Storage Tank • 16-02-04, Fuel Oil Piping • 16-99-04, Fuel Line (Buried) and UST This plan provides the methodology of field activities necessary to gather information to close each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 124 using the SAFER process.

  11. Technology needs for environmental restoration remedial action. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Watson, J.S.

    1992-11-01

    This report summarizes the current view of the most important technology needs for the US Department of Energy (DOE) facilities operated by Martin Marietta Energy Systems, Inc. These facilities are the Oak Ridge National Laboratory, the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, the Paducah Gaseous Diffusion Plant, and the Portsmouth Gaseous Diffusion Plant. The sources of information used in this assessment were a survey of selected representatives of the Environmental Restoration (ER) programs at each facility, results from a questionnaire distributed by Geotech CWM, Inc., for DOE, and associated discussions with individuals from each facility. This is not a final assessment, but a brief look at an ongoing assessment; the needs will change as the plans for restoration change and, it is hoped, as some technical problems are solved through successful development programs.

  12. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 575: Area 15 Miscellaneous Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2014-12-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 575, Area 15 Miscellaneous Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 575 comprises the following four corrective action sites (CASs) located in Area 15 of the Nevada National Security Site: • 15-19-02, Waste Burial Pit • 15-30-01, Surface Features at Borehole Sites • 15-64-01, Decontamination Area • 15-99-03, Aggregate Plant This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 575 using the SAFER process. Additional information will be obtained by conducting a field investigation to document and verify the adequacy of existing information, to affirm the predicted corrective action decisions, and to provide sufficient data to implement the corrective actions. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  13. Streamlined approach for environmental restoration (SAFER) plan for corrective action unit 412: clean slate I plutonium dispersion (TTR) tonopah test range, Nevada, revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K.

    2015-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 412. CAU 412 is located on the Tonopah Test Range and consists of a single corrective action site (CAS), TA-23-01CS, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1997 interim corrective action to recommend closure of CAU 412 using the SAFER process. Based on existing data, the presumed corrective action for CAU 412 is clean closure. However, additional data will be obtained during a field investigation to document and verify the adequacy of existing information and determine whether the CAU 412 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU.The following summarizes the SAFER activities that will support the closure of CAU 412:• Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information.• If no COCs are present, establish clean closure as the corrective action. • If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF).• Confirm the preferred closure option is sufficient to protect human health and the environment.

  14. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 411. Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K. [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2015-03-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigation to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions

  15. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada With Errata Sheets, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Pat Matthews

    2007-09-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.

  16. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 square miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.

  17. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 408: Bomblet Target Area Tonopah Test Range (TTR), Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-03-01

    This Streamlined Approach for Environmental Restoration Plan addresses the actions needed to achieve closure of Corrective Action Unit (CAU) 408, Bomblet Target Area (TTR). Corrective Action Unit 408 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order. Corrective Action Unit 408 comprises Corrective Action Site TA-55-002-TAB2, Bomblet Target Areas. Clean closure of CAU 408 will be accomplished by removal of munitions and explosives of concern within seven target areas and potential disposal pits. The target areas were used to perform submunitions related tests for the U.S. Department of Energy (DOE). The scope of CAU 408 is limited to submunitions released from DOE activities. However, it is recognized that the presence of other types of unexploded ordnance and munitions may be present within the target areas due to the activities of other government organizations. The CAU 408 closure activities consist of: • Clearing bomblet target areas within the study area. • Identifying and remediating disposal pits. • Collecting verification samples. • Performing radiological screening of soil. • Removing soil containing contaminants at concentrations above the action levels. Based on existing information, contaminants of potential concern at CAU 408 include unexploded submunitions, explosives, Resource Conservation Recovery Act metals, and depleted uranium. Contaminants are not expected to be present in the soil at concentrations above the action levels; however, this will be determined by radiological surveys and verification sample results.

  18. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Area 25 and Area 26 Railroad Tracks, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-06-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 539, Areas 25 and 26 Railroad Tracks, as identified in the Federal Facility Agreement and Consent Order (FFACO). A modification to the FFACOwas approved in May 2010 to transfer the two Railroad Tracks corrective action sites (CASs) from CAU 114 into CAU539. The two CASs are located in Areas 25 and 26 of the Nevada Test Site: • 25-99-21, Area 25 Railroad Tracks • 26-99-05, Area 26 Railroad Tracks This plan provides the methodology for field activities needed to gather the necessary information for closing the two CASs. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of the CAU 539 Railroad Tracks CASs using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation should support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place with use restrictions. This will be presented in a closure report that will be prepared and submitted to the NDEP for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on December 14, 2009, by representatives of U.S.Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Navarro Nevada Environmental Services, LLC (NNES); and National Security Technologies

  19. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Burmeister

    2009-08-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada Test Site: • 25-41-03, EMAD Facility • 25-99-20, EMAD Facility Exterior Releases This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. It is anticipated that the results of the field investigation and implementation of a corrective action of clean closure will support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2009, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data

  20. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada (Revision No. 0, August 2001)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2001-08-21

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, as identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site in Nevada, consists of seven Corrective Action Sites (CASs): CAS 03-04-01, Area 3 Change House Septic System; CAS 03-09-01, Mud Pit Spill Over; CAS 03-09-03, Mud Pit; CAS 03-09-04, Mud Pit; CAS 03-09-05, Mud Pit; CAS 20-16-01, Landfill; CAS 20-22-21, Drums. Sufficient information and process knowledge from historical documentation and investigations are the basis for the development of the phased approach chosen to address the data collection activities prior to implementing the preferred closure alternative for each CAS. The Phase I investigation will determine through collection of environmental samples from targeted populations (i.e., mud/soil cuttings above textural discontinuity) if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels (PALs) at each of the CASs. If COPCs are present above PALs, a Phase II investigation will be implemented to determine the extent of contamination to support the appropriate corrective action alternative to complete closure of the site. Groundwater impacts from potentially migrating contaminants are not expected due to the depths to groundwater and limiting hydrologic drivers of low precipitation and high evaporation rates. Future land-use scenarios limit future uses to industrial activities; therefore, future residential uses are not considered. Potential exposure routes to site workers from contaminants of concern in septage and soils include oral ingestion, inhalation, or dermal contact (absorption) through in-advertent disturbance of contaminated structures and/or soils. Diesel within drilling muds is expected to be the primary COPC based on process

  1. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, with ROTC 1, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2011-11-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 465, Hydronuclear, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 465 comprises the following four corrective action sites (CASs) located in Areas 6 and 27 of the Nevada National Security Site: (1) 00-23-01, Hydronuclear Experiment; (2) 00-23-02, Hydronuclear Experiment; (3) 00-23-03, Hydronuclear Experiment; (4) 06-99-01, Hydronuclear. The sites will be investigated based on the data quality objectives (DQOs) developed on July 6, 2011, by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 465. For CAU 465, two potential release components have been identified. The subsurface release component includes potential releases of radiological and nonradiological contaminants from the subsurface hydronuclear experiments and disposal boreholes. The surface release component consists of other potential releases of radiological and nonradiological contaminants to surface soils that may have occurred during the pre- and post-test activities. This plan provides the methodology for collection of the necessary information for closing each CAS component. There is sufficient information and process knowledge from historical documentation, contaminant characteristics, existing regional and site groundwater models, and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 465 using the SAFER process. For potential subsurface releases, flow and transport models will be developed to integrate existing data into a conservative

  2. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-07-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible

  3. Water Awareness Through Environmental Restoration

    Science.gov (United States)

    Davis-Caldwell, K.

    2012-04-01

    This poster will highlight a series of project based activities carried out at Hammond Elementary School in Laurel, Maryland, USA. All of the featured projects revolve around the school's Green School Initiative or an integral part of the science curricula. The Maryland Green School program was developed by a diverse team of educators representing the Maryland Association for Environmental and Outdoor Education (MAEOE), Office of the Governor, the Maryland Association of Student Councils, Maryland Department of Education, Department of Natural Resources and Maryland Department of the Environment. The program is administered through the Maryland Association for Environmental and Outdoor Education. The Maryland Green Schools Award Program recognizes Maryland schools that include environmental education in the curricula, model best management practices at the school and address community environmental issues. Among these numerous projects water is a common thread. Hammond Elementary School lies within the Chesapeake Bay watershed which stretches across 64,000 square miles and encompasses the entire District of Columbia. Educational components address habitats, tributaries and, the estuary system. The projects being highlighted in the poster will include: Trout to Streams Project: This 4th grade project focuses on the natural filtration system that area trout provide to the local and global waterways. As students learn about the importance of various fish to the watershed, they come to understand the effect of changes in the population of fish species due to consumption and pollution. The service learning project highlighted teaches students about water quality as they raise trout eggs and monitor their development into hatching and later stream release. Buffer Streams Tree Planting Projects: This 5th grade science service learning project allows students to investigate the water quality and conditions of local area streams. This project teaches students the positive

  4. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  5. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  6. Environmental Restoration Program Control Management System

    Energy Technology Data Exchange (ETDEWEB)

    Duke, R.T.

    1992-08-13

    Environmental Restoration managers need to demonstrate that their programs are under control. Unlike most industrial programs, the public is heavily involved in Environmental Restoration activities. The public is demanding that the country prove that real progress is being made towards cleaning up the environment. A Program Control Management System can fill this need. It provides a structure for planning, work authorization, data accumulation, data analysis and change control. But it takes time to implement a control system and the public is losing its patience. This paper describes critical items essential to the quick development and implementation of a successful control system.

  7. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  8. Cost Estimating Handbook for Environmental Restoration

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-09-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

  9. Russian: United States Environmental Restoration Workshop

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The Russian - United States Environmental Restoration Workshop, held in Washington, D.C., and Richland, Washington, from April 5 through 18, 1993, was the first extended collaborative information exchange between the US Department of Energy (DOE) and Russian scientists at the site level. In addition to the Russian scientists, workshop participants included scientists and staff from DOE, Pacific Northwest Laboratory (PNL), Westinghouse Hanford Company (WHC), the US Environmental Training Institute (USETI), universities, and the private sector. The first week (April 5 through 10) of the workshop took place in Washington, D.C., where the Russian and US participants were presented with a US perspective on environmental restoration and remediation issues from representatives in DOE and the US Environmental Protection Agency (EPA). The second week (April 11 through 18) occurred in Richland, Washington, where the participants were presented with site-specific environmental restoration and remediation issues related to Hanford Site cleanup. This report is a compilation of the presentations, discussions, and experiences shared during the second week of the workshop in Richland, Washington.

  10. Integrating TQM into environmental restoration projects

    Energy Technology Data Exchange (ETDEWEB)

    Caldwell, J.A. [Jacobs Engineering Group, Inc., Lenexa, KS (United States)

    1992-12-31

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy`s Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review.

  11. Joint line and patellar height restoration after revision total knee arthroplasty

    Directory of Open Access Journals (Sweden)

    Jong-Keun Seon

    2016-01-01

    Conclusions: JL position can be sufficiently restored with appropriate distal femoral augment reconstruction after revision TKA, but the patellar height cannot be well improved, especially in the septic revision with obvious PT contracture. No correlation was found between the JL position and patellar height to the knee function post revision TKA.

  12. Environmental guidance for public participation in environmental restoration activities

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    The US Department of Energy (DOE) is issuing this document, entitled Guidance on Public Participation for US Department of Energy Environmental Restoration Activities, to summarize policy and provide guidance for public participation in environmental restoration activities at DOE Headquarters, Field Offices, facilities, and laboratories. While the Office of Environmental Restoration and Waste Management (EM) has environmental restoration responsibility for the majority of DOE sites and facilities, other DOE Project Offices have similar responsibilities at their sites and facilities. This guidance is applicable to all environment restoration activities conducted by or for DOE under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA); the Resource Conservation and Recovery Act of 1976 (RCRA) as amended by the Hazardous and Solid Waste Amendments of 1984 (HSWA) (corrective actions only); and the National Environmental Policy Act of 1969 (NEPA). This guidance also is applicable to CERCLA remedial action programs under the Uranium Mill Tailings Radiation Control Act of 1978 and the Formerly Utilized Sites Remedial Action Program, where DOE is the designated lead. The primary objectives of this guidance document are as follows: acclimate DOE staff to a changing culture that emphasizes the importance of public participation activities; provide direction on implementing these public participation activities; and, provide consistent guidance for all DOE Field Offices and facilities. The purpose of this document is to provide guidance on conducting effective public participation activities for environmental restoration activities under CERCLA; RCRA corrective actions under sections 3004(u), 3004(v), and 3008(h); and NEPA public participation activities.

  13. 1998 Annual Report - Environmental Restoration Division

    Energy Technology Data Exchange (ETDEWEB)

    Davis, L.B.

    1998-12-30

    This is a 1998 annual report for Environmental Restoration. Environmental Restoration's accomplishments were significant in 1998. The division, including its support organizations, completed one year without a lost time accident. It also met 111 enforceable agreement milestones on time, with more than 80% ahead of schedule. Funds used to meet these milestones were effectively utilized and $9.63 million in regulatory scope was added. Twelve new, innovative technologies were deployed, enabling ER to achieve significant progress on major field remediation projects, including: Remediation of 25 acres of radioactive burial ground; Removal of 1,300 batteries for recycling; Removal and safe storage of a radioactive underground tank; Extraction of 115,000 pounds of solvent; and Installation of 9 new recirculation wells and a second GeoSiphon Cell for additional removal of solvent Final Records of Decision were made for 9 base unit sites. No Further Action decisions were made for 61 additional sites.

  14. Technology needs for environmental restoration remedial action

    Energy Technology Data Exchange (ETDEWEB)

    Watson, J.S.

    1992-11-01

    This report summarizes the current view of the most important technology needs for the US Department of Energy (DOE) facilities operated by Martin Marietta Energy Systems, Inc. These facilities are the Oak Ridge National Laboratory, the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, the Paducah Gaseous Diffusion Plant, and the Portsmouth Gaseous Diffusion Plant. The sources of information used in this assessment were a survey of selected representatives of the Environmental Restoration (ER) programs at each facility, results from a questionnaire distributed by Geotech CWM, Inc., for DOE, and associated discussions with individuals from each facility. This is not a final assessment, but a brief look at an ongoing assessment; the needs will change as the plans for restoration change and, it is hoped, as some technical problems are solved through successful development programs.

  15. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 357: Mud Pits and Waste Dump, Nevada Test Site, Nevada: Revision 0, Including Record of Technical Change No. 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-06-25

    This Streamlined Approach for Environmental Restoration (SAFER) plan was prepared as a characterization and closure report for Corrective Action Unit (CAU) 357, Mud Pits and Waste Dump, in accordance with the Federal Facility Agreement and Consent Order. The CAU consists of 14 Corrective Action Sites (CASs) located in Areas 1, 4, 7, 8, 10, and 25 of the Nevada Test Site (NTS). All of the CASs are found within Yucca Flat except CAS 25-15-01 (Waste Dump). Corrective Action Site 25-15-01 is found in Area 25 in Jackass Flat. Of the 14 CASs in CAU 357, 11 are mud pits, suspected mud pits, or mud processing-related sites, which are by-products of drilling activities in support of the underground nuclear weapons testing done on the NTS. Of the remaining CASs, one CAS is a waste dump, one CAS contains scattered lead bricks, and one CAS has a building associated with Project 31.2. All 14 of the CASs are inactive and abandoned. Clean closure with no further action of CAU 357 will be completed if no contaminants are detected above preliminary action levels. A closure report will be prepared and submitted to the Nevada Division of Environmental Protection for review and approval upon completion of the field activities. Record of Technical Change No. 1 is dated 3/2004.

  16. Introducing Restorative Justice: Re-Visioning Responses to Wrongdoing

    Science.gov (United States)

    Calhoun, Avery

    2013-01-01

    Learning about restorative justice involves examining conventional thinking about crime (or wrongdoing generally), values in relation to how people associated with wrongdoing are treated, and best responses when a wrongdoing occurs. In this introductory article, the author highlights key developments in the restorative movement and main…

  17. Development of decontamination, decommissioning and environmental restoration technology

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung Jik; Kwon, H. S.; Kim, G. N. and others

    1999-03-01

    Through the project of 'Development of decontamination, decommissioning and environmental restoration technology', the followings were studied. 1. Development of decontamination and repair technology for nuclear fuel cycle facilities 2. Development of dismantling technology 3. Development of environmental restoration technology. (author)

  18. Streamlined Approach for Environmental Restoration Plan for Corrective Action Units 530, 531, 532, 533, 534, and 535, Nevada Test Site Mud Pits, Nevada Test Site, Nevada, Revision 0 with ROTC 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Wickline, Alfred

    2005-07-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses closure for the following six corrective action units (CAUs) identified in the ''Federal Facility Agreement and Consent Order'' (1996): (1) CAU 530 - LANL Preshot Mud Pits; (2) CAU 531 - LANL Postshot Mud Pits; (3) CAU 532 - LLNL Preshot Mud Pits; (4) CAU 533 - LLNL Postshot Mud Pits; (5) CAU 534 - Exploratory/Instrumentation Mud Pits; and (6) CAU 535 - Mud Pits/Disposal Areas. Corrective Action Units 530-535 consist of corrective action sites (CASs) located in Areas 1-10, 14, 17, 19, and 20 of the Nevada Test Site (NTS). This plan provides the approach for activities needed to gather the necessary information for closing all the CASs within these CAUs. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of all CASs within CAUs 530-535 using the SAFER process. The Data Quality Objective (DQO) process utilized in this investigation follows the approved risk-based closure strategy outlined in the ''Mud Pit Risk-Based Closure Strategy Report'' (NNSA/NSO, 2004b). The closure strategy was developed based on available information including historical documentation of process knowledge, analytical results from previous sampling activities for contaminants of potential concern at similar mud pits located at the NTS and at off-site locations, future land-use scenarios for each NTS area, and potential exposure scenarios along with the calculated risk for human and ecological receptors.

  19. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Gregory A. Thomas

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  20. Environmental preference and restoration: (How) are they related?

    NARCIS (Netherlands)

    Berg, van den A.E.; Koole, S.L.; Wulp, van der N.Y.

    2003-01-01

    Does the widely documented tendency to prefer natural over built environments owe to the perception of greater restorative potential in natural environments? In the present experimental study we tested the mediating role of restoration in environmental preferences. Participants viewed a frightening

  1. Maumee Bay State Park, Ohio. Shoreline Erosion Beach Restoration Study. Final Feasibility Report and Final Environmental Impact Statement. Interim to Western Lake Erie Shore Study. Volume 2. Appendices. Revised.

    Science.gov (United States)

    1983-12-01

    systems at Presque Isle State Park, Lakeview Park, available research literature and design information on the subject and a revised wave analysis...an important commercial fish to Canada. Most smelt spawning areas are located in Canadian, New York, and Pennsylvania waters of Lake Erie . Smelt will...Water Quality Administration. 1968. Pollution of Lake Erie and its tributaries - Indiana, Michigan, New York, Ohio, Pennsylvania . Progress Evaluation

  2. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  3. DOE model conference on waste management and environmental restoration

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    Reports dealing with current topics in waste management and environmental restoration were presented at this conference in six sessions. Session 1 covered the Hot Topics'' including regulations and risk assessment. Session 2 dealt with waste reduction and minimization; session 3 dealt with waste treatment and disposal. Session 4 covered site characterization and analysis. Environmental restoration and associated technologies wee discussed in session 5 and 6. Individual papers have been cataloged separately.

  4. A revised classification for direct tooth-colored restorative materials.

    Science.gov (United States)

    Mount, Graham J; Tyas, Martin J; Ferracane, Jack L; Nicholson, John W; Berg, Joel H; Simonsen, Richard J; Ngo, Hien C

    2009-09-01

    Composite resins and glass-ionomer cements were introduced to dentistry in the 1960s and 1970s, respectively. Since then, there has been a series of modifications to both materials as well as the development other groups claiming intermediate characteristics between the two. The result is a confusion of materials leading to selection problems. While both materials are tooth-colored, there is a considerable difference in their properties, and it is important that each is used in the appropriate situation. Composite resin materials are esthetic and now show acceptable physical strength and wear resistance. However, they are hydrophobic, and therefore more difficult to handle in the oral environment, and cannot support ion migration. Also, the problems of gaining long-term adhesion to dentin have yet to be overcome. On the other hand, glass ionomers are water-based and therefore have the potential for ion migration, both inward and outward from the restoration, leading to a number of advantages. However, they lack the physical properties required for use in load-bearing areas. A logical classification designed to differentiate the materials was first published by McLean et al in 1994, but in the last 15 years, both types of material have undergone further research and modification. This paper is designed to bring the classification up to date so that the operator can make a suitable, evidence-based, choice when selecting a material for any given situation.

  5. Environment, Environmental Restoration, and Waste Management Field Organization Directory

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    This directory was developed by the Office of Environmental Guidance, RCRA/CERCLA Division (EH-231) from an outgrowth of the Departments efforts to identify and establish the regulatory response lead persons in the Field Organizations. The directory was developed for intemal EH-231 use to identify both the DOE and DOE contractor Field Organizations in the Environment, Environmental Restoration and Waste Management areas. The Field Organization directory is divided into three substantive sections: (1) Environment; (2) Environmental Restoration; and (3) Waste Management which are organized to correspond to the management hierarchy at each Field Organization. The information provided includes the facility name and address, individual managers name, and telephone/fax numbers.

  6. Benefits of On-Site Management of Environmental Restoration Wastes

    Energy Technology Data Exchange (ETDEWEB)

    Irwin, Michael J. ,P.E.; Wood, Craig, R.E.M.; Kwiecinski, Daniel, P.E.; Alanis, Saul

    2003-02-27

    As Sandia National Laboratories/New Mexico (SNL/NM) began assessing options under which to conduct the remediation of environmental restoration sites, it became clear that the standard routes for permanent disposal of waste contaminated with hazardous materials would be difficult. Publicly, local citizens' groups resisted the idea of large volumes of hazardous waste being transported through their communities. Regulations for the off-site disposal are complicated due to the nature of the environmental restoration waste, which included elevated tritium levels. Waste generated from environmental restoration at SNL/NM included debris and soils contaminated with a variety of constituents. Operationally, disposal of environmental restoration waste was difficult because of the everchanging types of waste generated during site remediation. As an alternative to standard hazardous waste disposal, SNL/NM proposed and received regulatory approval to construct a Corrective Action Management Unit (CAMU). By containing the remediation wastes on-site, SNL/NM's Environmental Restoration (ER) Program managed to eliminate transportation concerns from the public, worked with regulatory agencies to develop a safe, permanent disposal, and modified the waste disposal procedures to accommodate operational changes. SNL/NM accomplished the task and saved approximately $200 million over the life of the CAMU project, as compared to off-site disposal options.

  7. Environmental assessment of defense environmental restoration program activities on St. Lawrence Island

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The magnitude and extent of environmental impacts associated with Defense environmental Restoration Program activities at Gambell and Northeast Cape varies. The...

  8. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  9. Maumee Bay State Park, Ohio. Shoreline Erosion Beach Restoration Study. Final Feasibility Report and Final Environmental Impact Statement. Interim to Western Lake Erie Shore Study. Volume 1. Main Report. Revised.

    Science.gov (United States)

    1983-12-01

    Oesirahie Comeb-ty lo loss lone lose loss CS) Caltacai oAss lose lo iopact on signifioant Sam as Alterallee 2a. Uase as Alternativo 2,. Samo...soils are underlain by thick sedimentary 56 rock sequences, including limestones, dolomites, and shales. The soil over- burden is relatively thick, and...However, several environmental features have been incorDorated into the Recommended Plan. All shoreline structures would be constructed of large rock

  10. Matrices to Revise Crop, Soil, and Environmental Sciences Undergraduate Curricula

    Science.gov (United States)

    Savin, Mary C.; Longer, David; Miller, David M.

    2005-01-01

    Undergraduate curricula for natural resource and agronomic programs have been introduced and revised during the past several decades with a desire to stay current with emerging issues and technologies relevant to constituents. For the past decade, the Department of Crop, Soil, and Environmental Sciences (CSES) faculty at the University of Arkansas…

  11. 75 FR 13138 - Grand Ditch Breach Restoration Environmental Impact Statement, Rocky Mountain National Park, CO

    Science.gov (United States)

    2010-03-18

    ... National Park Service Grand Ditch Breach Restoration Environmental Impact Statement, Rocky Mountain... prepare an Environmental Impact Statement for the Grand Ditch Breach Restoration, Rocky Mountain National...), the National Park Service is preparing an Environmental Impact Statement for the Grand Ditch...

  12. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 9

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, D.A. [ed.; Bjornstad, B.N.; Fosmire, C.J. [and others

    1997-08-01

    This ninth revision of the Hanford Site National Environmental Policy Act (NEPA) Characterization presents current environmental data regarding the hanford Site and its immediate environs. This information is intended for use in preparing Chapters 4 and 6 in Hanford Site-related NEPA documents. Chapter 4.0 (Affected Environment) includes information on climate and meteorology, geology, hydrology, ecology, cultural, archaeological and historical resources, socioeconomics, and noise. Chapter 6.0 (Statutory and Regulatory Requirements) provides the preparer with the federal and state regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site. Not all of the sections have been updated for this revision. The following lists the updated sections: climate and meteorology; ecology (threatened and endangered species section only); culture, archaeological, and historical resources; socioeconomics; all of Chapter 6.

  13. Strategic plan for Hanford Site Environmental Restoration Information Management

    Energy Technology Data Exchange (ETDEWEB)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E. [and others

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  14. Revegetation manual for the environmental restoration contractor

    Energy Technology Data Exchange (ETDEWEB)

    McLendon, T.; Redente, E.F.

    1997-02-01

    The purpose of this manual is to provide guidance and general guidelines for the revegetation of remediation waste sites and other disturbed areas on the Hanford Site. Specific revegetation plans will be developed using guidance from this manual. Locations, resources, and funding will dictate the specific revegetation design at each disturbed area. Disturbances have occurred to some of the ecological communities of the Hanford Site. Many of these disturbances are the result of operations of the Hanford Site, including Comprehensive Environmental Response, Compensation, and Liability Act of 1980 waste sites on small portions of the Hanford Site. There were, however, extensive disturbances to the native vegetation prior to operations of the facility. These resulted from cultivation, grazing, fire, and the introduction of exotics. Revegetation planning must take into account these early disturbances, as well as the later ones.

  15. Environmental monitoring plan - environmental monitoring section. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  16. Environmental restoration using plant-microbe bioaugmentation

    Energy Technology Data Exchange (ETDEWEB)

    Kingsley, M.T.; Metting, F.B.; Fredrickson, J.K.; Seidler, R.J.

    1993-04-01

    Land farming, for the purpose of bioremediation, refers traditionally to the spreading of contaminated soil, sediments, or other material over land; mechanically mixing it; incorporating various amendments, such as fertilizer or mulch; and sometimes inoculating with degradative microorganisms. Populations of bacteria added to soils often decline rapidly and become metabolically inactive. To efficiently degrade contaminants, microorganisms must be metabolically active. Thus, a significant obstacle to the successful use of microorganisms for environmental applications is their long-term survival and the expression of their degradative genes in situ. Rhizosphere microorganisms are known to be more metabolically active than those in bulk soil, because they obtain carbon and energy from root exudates and decaying root matter. Rhizosphere populations are also more abundant, often containing 10[sup 8] or more culturable bacteria per gram of soil, and bacterial populations on the rhizoplane can exceed 10[sup 9]/g root. Many of the critical parameters that influence the competitive ability of rhizosphere bacteria have not been identified, but microorganisms have frequently been introduced into soil (bioaugmentation) as part of routine or novel agronomic practices. However, the use of rhizosphere bacteria and their in situ stimulation by plant roots for degrading organic contaminants has received little attention. Published studies have demonstrated the feasibility of using rhizobacteria (Pseudomonas putida) for the rapid removal of chlorinated pesticides from contaminated soil, and to promote germination of radish seeds in the presence of otherwise phytotoxic levels of the herbicide 2,4-dichlorophenoxyacetic acid (2,4-D), and phenoxyacetic acid (PAA). The present investigation was undertaken to determine if these strains (Pseudomonas putida PP0301/pRO101 and PP0301/pRO103) could be used to bioremediate 2,4-D-amended soil via plant-microbe bioaugmentation.

  17. Environmental restoration using plant-microbe bioaugmentation

    Energy Technology Data Exchange (ETDEWEB)

    Kingsley, M.T.; Fredrickson, J.K.; Metting, F.B.; Seidler, R.J.

    1993-04-01

    Land farming, for the purpose of bioremediation, refers traditionally to the spreading of contaminated soil, sediments, or other material over land; mechanically mixing it; incorporating various amendments, such as fertilizer or mulch; and sometimes inoculating with degradative microorganisms. Populations of bacteria added to soils often decline rapidly and become metabolically inactive. To efficiently degrade contaminants, microorganisms must be metabolically active. Thus, a significant obstacle to the successful use of microorganisms for environmental applications is their long-term survival and the expression of their degradative genes in situ. Rhizosphere microorganisms are known to be more metabolically active than those in bulk soil, because they obtain carbon and energy from root exudates and decaying root matter. Rhizosphere populations are also more abundant, often containing 10{sup 8} or more culturable bacteria per gram of soil, and bacterial populations on the rhizoplane can exceed 10{sup 9}/g root. Many of the critical parameters that influence the competitive ability of rhizosphere bacteria have not been identified, but microorganisms have frequently been introduced into soil (bioaugmentation) as part of routine or novel agronomic practices. However, the use of rhizosphere bacteria and their in situ stimulation by plant roots for degrading organic contaminants has received little attention. Published studies have demonstrated the feasibility of using rhizobacteria (Pseudomonas putida) for the rapid removal of chlorinated pesticides from contaminated soil, and to promote germination of radish seeds in the presence of otherwise phytotoxic levels of the herbicide 2,4-dichlorophenoxyacetic acid (2,4-D), and phenoxyacetic acid (PAA). The present investigation was undertaken to determine if these strains (Pseudomonas putida PPO301/pRO101 and PPO301/pRO103) could be used to bioremediate 2,4-D-amended soil via plant-microbe bioaugmentation.

  18. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  19. Environmental Restoration and Waste Management (EM) program: An introduction

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    This booklet introduces the reader to the mission and functions of a major new unit within the US Department of Energy (DOE): the Office of Environmental Restoration and Waste Management (EM). The Secretary of Energy established EM in November 1989, implementing a central purpose of DOE's first annual Environmental Restoration and Waste Management Five-Year Plan, which had appeared three months earlier. The contents of this booklet, and their arrangement, reflect the annual update of the Five-Year Plan. The Five-Year Plan supports DOE's strategy for meeting its 30-year compliance and cleanup goal. This strategy involves: focusing DOE's activities on eliminating or reducing known or recognized potential risks to worker and public health and the environment, containing or isolating, removing, or detoxifying onsite and offsite contamination, and developing technology to achieve DOE's environmental goals.

  20. 75 FR 8045 - National Environmental Policy Act (NEPA) Draft Guidance, Establishing, Applying, and Revising...

    Science.gov (United States)

    2010-02-23

    ... QUALITY National Environmental Policy Act (NEPA) Draft Guidance, Establishing, Applying, and Revising Categorical Exclusions Under the National Environmental Policy Act AGENCY: Council on Environmental Quality... Exclusions Under the National Environmental Policy Act.'' SUMMARY: On February 18, 2010, the Council...

  1. Hanford Site National Environmental Policy Act (NEPA) Characterization, Revision 15

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Bunn, Amoret L.; Burk, Kenneth W.; Cannon, Sandra D.; Duncan, Joanne P.; Fowler, Richard A.; Fritz, Brad G.; Harvey, David W.; Hendrickson, Paul L.; Horton, Duane G.; Last, George V.; Poston, Ted M.; Prendergast-Kennedy, Ellen L.; Reidel, Steve P.; Scott, Michael J.; Thorne, Paul D.; Woody, Dave M.

    2003-09-01

    This document describes the U.S. Department of Energy's (DOE) Hanford Site environment. It is updated each year and is intended to provide a consistent description of the Hanford Site environment for the many National Environmental Policy Act (NEPA) documents being prepared by DOE contractors. No statements of significance or environmental consequences are provided. This year's report is the thirteenth revision of the original document published in 1988 and is (until replaced by the fourteenth revision) the only version that is relevant for use in the preparation of Hanford NEPA, State Environmental Policy Act (SEPA), and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) documents. The two chapters included in this document (Chapters 4 and 6) are numbered to correspond to the chapters where such information is typically presented in environmental impact statements (Weiss) and other Hanford Site NEPA or CERCLA documentation. Chapter 4.0 (Affected Environment) describes Hanford Site climate and meteorology, geology, hydrology, ecology, cultural, archaeological, and historical resources, socioeconomics, occupational safety, and noise. Chapter 6.0 (Statutory and Regulatory Requirements) describes federal and state laws and regulations, DOE directives and permits, and presidential executive orders that are applicable to the NEPA documents prepared for Hanford Site activities.

  2. Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

  3. 78 FR 7450 - Final Environmental Impact Statement for Protecting and Restoring Native Ecosystems by Managing...

    Science.gov (United States)

    2013-02-01

    ... National Park Service Final Environmental Impact Statement for Protecting and Restoring Native Ecosystems... a Final Environmental Impact Statement for Protecting and Restoring Native Ecosystems by Managing... a manner that supports long-term ecosystem protection, supports natural ecosystem recovery and...

  4. Assessment and evaluation of technologies for environmental restoration. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Uzochukwu, G.A.

    1999-01-15

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration objectives of the Department of Energy are being evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objective of the environmental restoration effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites.

  5. Assessment and evaluation of technologies for environmental restoration. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Uzochukwu, G. A. [North Carolina A and T State Univ., Greensboro, NC (United States)

    2000-06-30

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration objectives of the Department of Energy are being evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objective of the environmental restoration effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites.

  6. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 7

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E. [ed.; Baker, D.A.; Chamness, M.A. [and others

    1995-09-01

    This seventh revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Chapter 4.0 summarizes up-to-date information on climate and meteorology, geology, hydrology, environmental monitoring, ecology, history and archaeology, socioeconomics, land use, and noise levels prepared by Pacific Northwest Laboratory (PNL) staff. More detailed data are available from reference sources cited or from the authors. Chapter 5.0 was not updated from the sixth revision (1994). It describes models, including their principal underlying assumptions, that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions. The updated Chapter 6.0 provides the preparer with the federal and state regulations, DOE Orders and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site, following the structure of Chapter 4.0. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be used directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the Hanford Site and its past activities by which to evaluate projected activities and their impacts.

  7. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

  8. A risk computation model for environmental restoration activities

    Energy Technology Data Exchange (ETDEWEB)

    Droppo, J.B. Jr.; Strenge, D.L.; Buck, J.W.

    1991-01-01

    A risk computation model useful in environmental restoration activities was developed for the US Department of Energy (DOE). This model, the Multimedia Environmental Pollutant Assessment System (MEPAS), can be used to evaluate effects of potential exposures over a broad range of regulatory issues including radioactive carcinogenic, nonradioactive carcinogenic, and noncarcinogenic effects. MEPAS integrates risk computation components. Release, transport, dispersion, deposition, exposure, and uptake computations are linked in a single system for evaluation of air, surface water, ground water, and overland flow transport. MEPAS uses standard computation approaches. Whenever available and appropriate, US Environmental Protection Agency guidance and models were used to facilitate compatibility and acceptance. MEPAS is a computational tool that can be used at several phases of an environmental restoration effort. At a preliminary stage in problem characterization, potential problems can be prioritized. As more data become available, MEPAS can provide an estimate of baseline risks or evaluate environmental monitoring data. In the feasibility stage, MEPAS can compute risk from alternative remedies. However, MEPAS is not designed to replace a detailed risk assessment of the selected remedy. For major problems, it will be appropriate to use a more detailed, risk computation tool for a detailed, site-specific evaluation of the selected remedy. 15 refs., 2 figs.

  9. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2010-04-26

    ... National Park Service Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement... Availability of the Draft Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan... Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan for Biscayne National Park, Florida...

  10. 76 FR 28757 - Defense Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense...

    Science.gov (United States)

    2011-05-18

    ... of the Secretary Defense Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense Logistics Agency Actions AGENCY: Defense Logistics Agency, Department of Defense. ACTION: Notice of Availability (NOA) of Revised Defense Logistics Agency Regulation. SUMMARY: The Defense Logistics...

  11. Hanford Site National Environmental Policy Act (NEPA) Characterization. Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E. [ed.

    1992-12-01

    This fifth revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Information is presented on climate and meteorology, geology and hydrology, ecology, history and archaeology, socioeconomics, land use, and noise levels, prepared by Pacific Northwest Laboratory (PNL) staff. Models are described that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions. Federal and state regulations, DOE orders and permits, and environmental standards directly applicable for the NEPA documents at the Hanford Site, are provided.

  12. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E. [ed.; Baker, D.A.; Chamness, M.A. [and others

    1994-08-01

    This sixth revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Chapter 4.0 summarizes up-to-date information on climate and meteorology, geology and hydrology, ecology, history and archaeology, socioeconomics, land use, and noise levels prepared by Pacific Northwest Laboratory (PNL) staff. More detailed data are available from reference sources cited or from the authors; Chapter 5.0 has been significantly updated from the fifth revision. It describes models, including their principal underlying assumptions, that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions; The updated Chapter 6.0 provides the preparer with the federal and state regulations, DOE orders and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site, following the structure of Chapter 4.0. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be utilized directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the Hanford Site and its past activities by which to evaluate projected activities and their impacts.

  13. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 8

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, D.A. [ed.; Bjornstad, B.N.; Fosmire, C.J.; Fowler, R.A. [and others

    1996-08-01

    This eighth revision of the Hanford Site National Environmental Policy Act (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Chapters 4 and 6 in Hanford Site-related NEPA documents. Chapter 4 (Affected Environment) includes information on climate and meteorology, geology, hydrology, ecology, historical, archaeological and cultural resources, socioeconomics, and noise. Chapter 6 (Statutory and Regulatory Requirements) provides the preparer with the federal and state regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site. The following sections were updated in this revision: climate and meteorology; ecology (threatened and endangered species section only); historical; archaeological and cultural resources; and all of chapter 6. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be used directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the hanford Site and its past activities by which to evaluate projected activities and their impacts.

  14. How technology is improving decision making for environmental restoration

    Energy Technology Data Exchange (ETDEWEB)

    Ditmars, J.

    1995-02-01

    Environmental restoration, or the cleanup of contaminants from past activities, at its core depends on a series of decisions about the nature and extent of contamination, the risk to human health and the environment, and the potential effectiveness of remediation techniques and technologies to reduce the risk to acceptable levels. The effectiveness with which these decisions are made has significant impacts on the cost and duration of the cleanup efforts. The decisions must often be made on the basis of incomplete and uncertain data. Emerging environmental information and data acquisition technologies together with appropriate strategies to support decision making are beginning to change the way environmental restoration occurs in the United States. Past environmental restoration activities too often relied on prescriptive data collection activities to generate the information upon which decisions were to be made. Retrospective studies of such activities have shown that, while often data were gathered for the purpose of reducing the risk in decision making, little true reduction in risk was realized and large amounts of resources were consumed. Recent examination of the failures in the United States to achieve many complete cleanups despite the investment of large sums and time points to the inability to have decisions made efficiently. The solution to the problem involves both regulatory change to allow more flexibility in decision-making and the introduction of technology to improve decision making. This paper reviews the recent assessments made of the cleanup process and application of strategies and technologies to enhance decision-making for cleanup. It provides examples of the new decision approaches and the technologies that have been employed to speed up characterization and to optimize the implementation of remediation.

  15. Programme for the Environmental Control at the Swedish Nuclear Facilities, Revision; Omgivningskontrollprogram foer de kaerntekniska anlaeggningarna, revision

    Energy Technology Data Exchange (ETDEWEB)

    Linden, Ann-Marie

    2004-12-01

    This report contains a revised version of the Environmental Monitoring Programme for the Swedish Nuclear Facilities. The revision is based on earlier experiences and evaluations. Some samples have been excluded. Some have been added, for example spruce cone and the food products apple and currant. The sediment samples of 2 cm length have been completed with samples of 10 cm length every fourth year to follow the migration of radio nuclides down the sediment layers over time. The revised Environmental Monitoring Programme is valid from the 1st of January 2005.

  16. Planning and Restoration of Environmental Values in Nigeria Dysfunctional Societies

    Directory of Open Access Journals (Sweden)

    J. O Basorun

    2013-04-01

    Full Text Available Urban centers in Nigeria are becoming dysfunctional – a situation that threatens ourenvironmental values. This study, examines the pattern, process and problems of thesesocieties which experience rapid urban development pressure on account of highpopulation growth and decentralization of governance in the form of states and localgovernment creations. The study adopts extensive review of literature and findings revealthat Nigeria records very high level of urbanization and pollution, lacks effective culturaland physical planning policies, mismanages its urban open spaces, without adequatepersonnel to plan and organize the urban environments. Recommendations were madeon ways of restoring these environmental values through effective planning of urbancenters in Nigeria.

  17. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment.

  18. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2011-04-29

    ... National Park Service Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement... Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan, Biscayne National... Impact Statement for the Coral Reef Restoration Plan (Plan/FEIS) for Biscayne National Park, Florida. The...

  19. 78 FR 32441 - Grand Ditch Breach Restoration, Final Environmental Impact Statement, Rocky Mountain National...

    Science.gov (United States)

    2013-05-30

    ... National Park Service Grand Ditch Breach Restoration, Final Environmental Impact Statement, Rocky Mountain... Availability of the Final Environmental Impact Statement for the Grand Ditch Breach Restoration, Rocky Mountain... Grand Ditch Breach Restoration, Rocky Mountain National Park, Colorado. DATES: The National Park...

  20. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  1. Annual Status Report (FY2016) Performance Assessment for the Environmental Restoration Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Casbon, M. A. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2017-03-15

    DOE O 435.1, Radioactive Waste Management, and DOE M 435.1-1, Radioactive Waste Management Manual, require that a determination of continued adequacy of the performance assessment (PA), composite analysis (CA), and disposal authorization statement (DAS) be made on an annual basis, and it must consider the results of data collection and analysis from research, field studies, and monitoring. Annual summaries of low-level waste (LLW) disposal operations must be prepared with respect to the conclusions and recommendations of the PA and CA, and a determination of the need to revise the PA or CA must be made. The annual summary requirement provides a structured approach for demonstrating the continued adequacy of the PA and CA in demonstrating a reasonable expectation that the performance objectives will be met. This annual summary addresses only the status of the Environmental Restoration Disposal Facility (ERDF) PA (CP-60089, Performance Assessment for the Environmental Restoration Disposal Facility, Hanford Site, Washington, formerly WCH-520 Rev. 1)1. The CA for ERDF is supported by DOE/RL-2016-62, Annual Status Report (FY 2016): Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site. The ERDF PA portion of the CA document is found in Section 3.1.4, and the ERDF operations portion is found in Section 3.3.3.2 of that document.

  2. Ecological risks of DOE`s programmatic environmental restoration alternatives

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This report assesses the ecological risks of the Department of Energy`s (DOE) Environmental Restoration Program. The assessment is programmatic in that it is directed at evaluation of the broad programmatic alternatives outlined in the DOE Implementation Plan. It attempts to (1) characterize the ecological resources present on DOE facilities, (2) describe the occurrence and importance of ecologically significant contamination at major DOE facilities, (3) evaluate the adverse ecological impacts of habitat disturbance caused by remedial activities, and (4) determine whether one or another of the programmatic alternatives is clearly ecologically superior to the others. The assessment focuses on six representative facilities: the Idaho National Engineering Laboratory (INEL); the Fernald Environmental Management Project (FEMP); the Oak Ridge Reservation (ORR), including the Oak Ridge National Laboratory (ORNL), Y-12 plant, and K-25 plant; the Rocky Flats Plant; the Hanford Reservation; and the Portsmouth Gaseous Diffusion Plant.

  3. 75 FR 8997 - National Environmental Policy Act; Wallops Flight Facility Shoreline Restoration and...

    Science.gov (United States)

    2010-02-26

    ... SPACE ADMINISTRATION National Environmental Policy Act; Wallops Flight Facility Shoreline Restoration... Wallops Flight Facility (WFF) Shoreline Restoration and Infrastructure Protection Program (SRIPP). SUMMARY... from the Wallops Island shoreline and the infrastructure behind it. Alternative One, NASA's...

  4. Environmental monitoring, restoration and assessment: What have we learned

    Energy Technology Data Exchange (ETDEWEB)

    Gray, R.H. (ed.)

    1990-01-01

    The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facility operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort How do we decide when enough monitoring is enough Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes Are current regulatory requirements too restrictive or too lenient Can monitoring and assessment be made more cost effective Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases.

  5. A Revised Conceptual Framework for Payments for Environmental Services

    Directory of Open Access Journals (Sweden)

    E. J. Milner-Gulland

    2009-12-01

    Full Text Available Over the past decade, “Payments for Environmental Services” (PES have received a great deal of attention as a natural-resource management approach. We propose a revised definition and framework for PES implementation that focuses on the use of positive incentives as the philosophy behind PES and conditionality as the method for influencing behaviors. We note the importance of additionality of PES interventions to justify their value in a wider context. Finally, we highlight the need to understand the local institutional context in terms of the characteristics of buyers, sellers, and their relationship for implementation to be effective. Our framework acts as a platform to begin examining how the variety of options for structuring PES projects can be adapted to a range of existing institutional contexts.

  6. Restoring biodiversity in the Gwydir Wetlands through environmental flows.

    Science.gov (United States)

    Mawhinney, W A

    2003-01-01

    As part of the Water Reforms process, environmental flow rules have been progressively implemented in New South Wales rivers. The Integrated Monitoring of Environmental Flows (IMEF) is a major project established to better understand how rivers and associated wetlands respond to environmental water allocations. The results presented here represent the vegetation data collected for the testing of the hypothesis that "protecting or restoring a portion of freshes and high flows and otherwise maintaining natural flow variability will replenish anabranches and riverine wetlands, restoring their biodiversity". The study site is the Ramsar listed Gwydir Wetlands, located on the Gingham and Gwydir (Big Leather) Watercourses in the Lower Gwydir Valley, 100 km west of Moree. The expansion of irrigated agriculture in the lower Gwydir valley has severely altered flow regimes in the wetlands. The spread of the weed Phyla canescens (Lippia) is of major concern to landholders in the Gwydir Wetlands. Results indicate that Paspalum distichum (Water couch) and Eleocharis plana (Ribbed spike-rush) can maintain dominance over Phyla canescens if flooding occurs on a semi-regular basis. Conversely, Eichhornia crassipes (Water hyacinth) is a rampant noxious weed of open water in the Gwydir Wetlands, and has quickly spread in areas that are inundated for long periods. Management of this weed requires periodic drying of the wetlands to cause desiccation and death of the plants. The flooding requirement of individual species and plant associations in the Gwydir Wetlands are currently not fully understood. By providing better information on the consequence of different flows, the IMEF project will help to develop better management strategies to shift the dominance from introduced species such as P. canescens and E. crassipes to more desirable native plant species.

  7. 78 FR 46255 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction

    Science.gov (United States)

    2013-07-31

    ... COMMISSION 10 CFR Part 51 RIN 3150-AI42 Revisions to Environmental Review for Renewal of Nuclear Power Plant... environmental effect of renewing the operating license of a nuclear power plant. Compliance with the provisions... nuclear power plant. This document is necessary to clarify and correct the revisions made to the......

  8. Prospective environmental restoration/ restoration up front: a concept for an incentive-based program to increase restoration planning and implementation in the United States.

    Science.gov (United States)

    Stahl, Ralph G; Gouguet, Ron; DeSantis, Amanda; Liu, Jenny; Ammann, Michael

    2008-01-01

    This article describes a concept variously termed prospective environmental restoration, restoration up front, or restoration banking. Briefly, the concept centers on the ability of an entity, public or private, to gain durable credits for undertaking proactive restoration activities. Once obtained, these credits can be applied to an existing liability, held in the event of a future liability, or traded or sold to others that might have need for the credits. In the case of a natural resource damage claim or response action, possessing or applying the credits does not negate the need for responsible entities to clean up spills or releases of hazardous substances or oil or to address their clean-up requirements under applicable federal and state statutes. Concepts similar to prospective environmental restoration/restoration up front include wetlands mitigation banking, conservation habitat banking, and emissions trading. Much of the concept and details provided herein stem from the practice of natural resource damage assessment, although that is not the sole driver for the concept. The concept could also apply where the credits could be used to offset other environmental liabilities, for example, to provide habitat mitigation where development is being planned. The authors believe that the concept, if widely applied, could reduce the time and costs associated with restoration and perhaps lead to an increase in voluntary restoration and conservation nationally. Currently, there are no state or federal regulations or policies that directly provide for this approach.

  9. Environmental Restoration Operations: Consolidated Quarterly Report January -March 2017

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-07-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the January, February, and March 2017 quarterly reporting period. Table I-1 lists the Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active mission sites are located in TA-III. This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent.

  10. 78 FR 26319 - Deepwater Horizon Oil Spill; Proposal of Future Early Restoration Projects and Environmental Reviews

    Science.gov (United States)

    2013-05-06

    ... early restoration projects that will provide meaningful benefits to accelerate restoration in the Gulf... resource services for the public's benefit while the longer-term process of fully assessing injury and... review of a draft, a Phase I Early Restoration Plan/Environmental Assessment (Phase I ERP) in April 2012...

  11. 76 FR 72436 - Draft Environmental Impact Statement for Protecting and Restoring Native Ecosystems by Managing...

    Science.gov (United States)

    2011-11-23

    ...; 2310-0057-422] Draft Environmental Impact Statement for Protecting and Restoring Native Ecosystems by... Restoring Native Ecosystems by Managing Non-Native Ungulates. SUMMARY: The National Park Service (NPS... Restoring Native Ecosystems by Managing Non-Native Ungulates, Hawaii Volcanoes National Park, Hawaii. The...

  12. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-15

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones.

  13. 76 FR 72391 - Defense Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense...

    Science.gov (United States)

    2011-11-23

    ... Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense Logistics Agency Actions AGENCY: Defense Logistics Agency, Department of Defense. ACTION: Revised Defense Logistics Agency Regulation (DLAR) 1000.22. SUMMARY: On May 18, 2011, the Defense Logistics Agency (DLA) published a Notice of...

  14. 76 FR 53119 - Defense Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense...

    Science.gov (United States)

    2011-08-25

    ... Office of the Secretary Defense Logistics Agency Revised Regulation 1000.22, Environmental Considerations in Defense Logistics Agency Actions AGENCY: Defense Logistics Agency, Department of Defense. ACTION: Comment Addressed on Notice of Availability (NOA) of Revised Defense Logistics Agency Regulation (DLAR...

  15. Environmental Restoration Operations Consolidated Quarterly Report: July-September 2016

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the July, August, and September 2016 quarterly reporting period. The Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM are listed in Table I-1. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active sites are located in TA-III.

  16. Pollution prevention in environmental restoration projects: communication, innovation, and implementation

    Energy Technology Data Exchange (ETDEWEB)

    Wilczek, T.A.

    1996-11-01

    With the change in US Department of Energy`s (DOE) primary mission from weapons production to complex clean-up, there is an increased emphasis to utilize proven tools and techniques that, when modified, will assist in this massive remediation effort. Tools and techniques which increase process efficiency while minimizing costs are highly attractive. The introduction of formalized Pollution Prevention (P2) practices into the DOE Environmental Restoration (ER) program should be encouraged to the measurable degree of success that P2 has obtained in DOE process operations. Most notably, the integration of Pollution Prevention Opportunity Assessments (PPOAs) into the ER process is highly recommended for three reasons: waste stream generation volumes will be minimized; the results of P2 implementation will be properly measured, quantified, and documented for use on other projects; and negative impacts to human health and the environment will be lessened. the application of P2 principles is encouraged as a Best Management Practice (BMP), in addition to minimizing waste generation to achieve DOE waste reduction goals. The challenge is how to apply P2 practices to ER projects and obtain quantifiable waster reductions.

  17. 76 FR 76121 - Revised Notice, Draft Environmental Impact Statement, Rosemont Copper Project on the Coronado...

    Science.gov (United States)

    2011-12-06

    ... Environmental Impact Statement and public meetings and commenting options (76 FR 64893). This revised notice...-West Social Center, 1111 Via Arcoiris, Green Valley, AZ 85614. 4. December 10, 2011, 1 p.m. to 5...

  18. Revised Comprehensive Conservation Plan and Environmental Impact Statement: Volumes 1 and 2- Kenai National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Revised Comprehensive Conservation Plan (Plan) and Environmental Impact Statement (EIS) for the Kenai National Wildlife Refuge will guide management of the...

  19. Environmental Assessment Revised Hunting Plan Erie National Wildlife Refuge 1987

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 1984 a serious review of the existing plans led to a decision to completely post the boundary and make the necessary revisions/addendums to the hunting plan that...

  20. Revised

    DEFF Research Database (Denmark)

    Johannsen, Vivian Kvist; Nord-Larsen, Thomas; Riis-Nielsen, Torben;

    This report is a revised analysis of the Danish data on CO2 emissions from forest, afforestation and deforestation for the period 1990 - 2008 and a prognosis for the period until 2020. Revision have included measurements from 2009 in the estimations. The report is funded by the Ministry of Climate...

  1. LANL environmental restoration site ranking system: System description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Merkhofer, L.; Kann, A.; Voth, M. [Applied Decision Analysis, Inc., Menlo Park, CA (United States)

    1992-10-13

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides.

  2. Environmental effect of vegetation restoration on degraded ecosystem in low subtropical China

    Institute of Scientific and Technical Information of China (English)

    2003-01-01

    The environmental effect of degraded ecosystem's vegetation restoration in low subtropical China was studied. Results indicated thatthe vegetation recovery on degraded lands significantly ameliorates surrounding environment, increases species diversity, improves soilstructure, raises soil fertility, enhances productivity, and promotes regional agricultural production and social economic developmentdramatically. Through the combining engineering and biological measures, the restoration of degraded ecosystem in low subtropical area ispossible and economical. The restoration experience in Xiaoliang, Wuhua and other sites are valuable for other degraded subtropical area wasintroduced.

  3. Risk-based priority scoring for Brookhaven National Laboratory environmental restoration programs

    Energy Technology Data Exchange (ETDEWEB)

    Morris, S.C.; Meinhold, A.F.

    1995-05-01

    This report describes the process of estimating the risk associated with environmental restoration programs under the Brookhaven National Laboratory Office of Environmental Restoration. The process was part of an effort across all Department of Energy facilities to provide a consistent framework to communicate risk information about the facilities to senior managers in the DOE Office of Environmental Management to foster understanding of risk activities across programs. the risk evaluation was a qualitative exercise. Categories considered included: Public health and safety; site personnel safety and health; compliance; mission impact; cost-effective risk management; environmental protection; inherent worker risk; environmental effects of clean-up; and social, cultural, political, and economic impacts.

  4. Sage steppe ecosystem restoration strategy : Final environmental impact statement

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Sage Steppe Ecosystem Restoration Strategy EIS focuses on therestoration of sage steppe ecosystems that have come to be dominated by juniper, as the densityof...

  5. Environmental management 1994. Progress and plans of the environmental restoration and waste management program

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Department of Energy currently faces one of the largest environmental challenges in the world. The Department`s Environmental Restoration and Waste Management program is responsible for identifying and reducing risks and managing waste at 137 sites in 34 States and territories where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. The number of sites continues to grow as facilities are transferred to be cleaned up and closed down. The program`s main challenge is to balance technical and financial realities with the public`s expectations and develop a strategy that enables the Department to meet its commitments to the American people. This document provides a closer look at what is being done around the country. Included are detailed discussions of the largest sites in the region, followed by site activities organized by state, and a summary of activities at FUSRAP and UMTRA sites in the region.

  6. Mineral exploitation by surface mining and environmental restoration. Explotacion minera a cielo abierto y restauracion ambiental

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    The subject of environmental restoration of zones affected by the opencast exploitation of coal, is one of the most interesting for mineral zones since at the end of the industrial process the reclaimed land is appropriate for subsequent use. In all, HUNOSA has restored more than 1000 Ha of pasture. 1 fig.

  7. 75 FR 52969 - Final Environmental Impact Statement; Prisoners Harbor Wetland Restoration, Santa Cruz Island...

    Science.gov (United States)

    2010-08-30

    ... National Park Service Final Environmental Impact Statement; Prisoners Harbor Wetland Restoration, Santa... coastal wetland on Santa Cruz Island, Channel Islands National Park. The requisite no-action ``wait period... restoration of palustrine wetlands and deepwater habitat at Prisoners Harbor, as well as remove a...

  8. Environmentally Sensitive Areas Surveys Program threatened and endangered species survey: Progress report. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    King, A.L.; Awl, D.J.; Gabrielsen, C.A.

    1994-09-01

    The Endangered Species Act (originally passed in 1973) is a Federal statute that protects both animal and plant species. The Endangered Species Act identifies species which are, without careful management, in danger of becoming extinct and species that are considered threatened. Along with the designation of threatened or endangered, the Endangered Species Act provides for the identification of appropriate habitat for these species. Since 1993, the United States Department of Energy`s (DOE) Environmental Restoration (ER) Program has supported a program to survey the Oak Ridge Reservation (ORR) for threatened and endangered species. The Environmentally Sensitive Areas Surveys Program initiated vascular plant surveys during fiscal year 1993 and vertebrate animal surveys during fiscal year 1994 to determine the baseline condition of threatened and endangered species on the ORR at the present time. Data collected during these surveys are currently aiding Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Remedial Investigations on the ORR. They also provide data for ER and Waste Management decision documents, ensure that decisions have technical and legal defensibility, provide a baseline for ensuring compliance with principal legal requirements and will increase public confidence in DOE`s adherence to all related environmental resources rules, laws, regulations, and instructions. This report discusses the progress to date of the threatened and endangered species surveys of the ORR.

  9. Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.

    1993-07-01

    A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D&D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities.

  10. Environment, Safety and Health independent evaluation of Fernald Environmental Restoration Management Company`s (FERMCO) Comprehensive Environmental Occupational Safety and Health Program (CEOSHP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The Office of Environmental Management (EM) requested the Office of Environment, Safety and Health (EH) to perform an independent evaluation of Fernald Environmental Restoration Management Corporation`s (FERMCO`s) Comprehensive Environmental occupational Safety and Health Program (CEOSHP) document. In 1992, FERMCO was awarded the Department of Energy`s (DOE) first Environmental Restoration Management Contract and developed the CEOSHP to respond to contract requirements. EH limited its review to the CEOSHP because this document constitutes FERMCO`s written environment, safety and health (ES&H) program document and thus provides the basis for FERMCO`s ES&H program. EH`s independent review identified several major areas of the CEOSHP that need to be revised if it is to function successfully as the program-level document for FERMCO`s environment, safety and health program. The problems identified occur throughout the document and apply across the three CEOSHP sections evaluated by EH: the Occupational Safety and Health program, the Environmental Protection program, and the Radiological Control program. Primary findings of the CEOSHP: (1) Does not fully reflect the occupational safety and health, environmental protection, and radiological control requirements of the Department; (2) Does not convey a strong sense of management leadership of the program or clearly delineate employee rights, responsibilities, and roles in FERMCO`s ES&H program; (3) Is not a program management-level document; (4) Does not describe a ``seamless`` ES&H program; and (5) Does not clearly convey how FERMCO`s ES&H program actually works. EH`s detailed evaluation of FERMCO`s CEOSHP, along with specific recommendations are presented in Sections 2, 3, and 4 of this report. EH believes that EM will find this review and analysis useful in its efforts to assist FERMCO in a comprehensive redrafting of the CEOSHP.

  11. Environmental restoration[1997 Scientific Report of the Belgian Nuclear Research Centre

    Energy Technology Data Exchange (ETDEWEB)

    Zeevaert, T.; Vanmaercke, H.

    1998-07-01

    The objectives of the research activities in the field of environmental restoration are: (1) to optimize and validate models for the impact assessment from environmental, radioactive contaminations, including waste disposal or discharges; (2) to support the policy of national authorities for public health and radioactive waste management. The main achievements for 1997 are given.

  12. US - Former Soviet Union environmental restoration and waste management activities, March 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    The Peaceful Uses of Atomic Energy Agreement was signed between DOE and the Ministry of Atomic Energy for the Russian Federation and provides a mechanism for cooperation in research, development, and safe utilization of nuclear energy. Under the umbrella of this agreement, DOE and the former Ministry of Atomic Power and Industry signed a Memorandum of Cooperation in the areas of environmental restoration and waste management in September 1990. This document discusses the environmental situation, science and technology process, technical projects (separations, contaminant transport, waste treatment, environmental restoration), scientist exchanges, enhanced data transfer, the US-Russia industry partnership (conference, centers), and future actions.

  13. Yakima Fisheries Project : Revised Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  14. Environmental Regulatory Update Table, March/April 1993. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1993-05-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bimonthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  15. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Garrison, R.C.

    1995-02-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ``Tank Waste Remediation System (TWRS) Project Documentation Methodology,`` 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms` instrumentation, ventilation, electrical distribution, and waste transfer systems.

  16. Annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory for FY 1992. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Clapp, R.B. [ed.

    1992-09-01

    This report summarizes the salient features of the annual efforts of the investigations and monitoring, conducted to support the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL). The results presented can be used to develop a conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. Groundwater, soils, sediments, and surface water monitoring results are described.

  17. Method for environmental risk analysis (MIRA) revision 2007; Metode for miljoerettet risikoanalyse (MIRA) revisjon 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-15

    OLF's instruction manual for carrying out environmental risk analyses provides a united approach and a common framework for environmental risk assessments. This is based on the best information available. The manual implies standardizations of a series of parameters, input data and partial analyses that are included in the environmental risk analysis. Environmental risk analyses carried out according to the MIRA method will thus be comparable between fields and between companies. In this revision an update of the text in accordance with today's practice for environmental risk analyses and prevailing regulations is emphasized. Moreover, method adjustments for especially protected beach habitats have been introduced, as well as a general method for estimating environmental risk concerning fish. Emphasis has also been put on improving environmental risk analysis' possibilities to contribute to a better management of environmental risk in the companies (ml)

  18. 77 FR 14414 - Notice of Intent To Revise Resource Management Plans and an Associated Environmental Impact...

    Science.gov (United States)

    2012-03-09

    ... involved in the planning process: Timber, wildlife and fisheries, economics, botany, climate change/carbon... Environmental Impact Statement for Six Western Oregon Districts of the Bureau of Land Management AGENCY: Bureau..., the Bureau of Land Management (BLM) Oregon State Office, Portland, Oregon, intends to revise...

  19. Tire Production and Pollution Control. Environmental Education Curriculum. Revised.

    Science.gov (United States)

    Topeka Public Schools, KS.

    This unit was developed to introduce secondary students to the many facets of a typical, large manufacturing plant - the Topeka Goodyear Tire and Rubber Company - in an effort to increase awareness of sound environmental practices in industry. Its five major foci include the production of tires and quality control procedures; applications of…

  20. Management of the environmental restoration of degraded areas

    Directory of Open Access Journals (Sweden)

    Izabel Cristina Leinig Araujo

    2014-04-01

    Full Text Available The aim of this work was to study ecotechnology for the management of degraded areas originally covered by the Atlantic Rainforest and located at the coordinates 25º31'50''S, 9º09'30''W. The area included 12 islands, each consisting of six jute bags with 20 kg of substrate (cattle manure and soil transposed from forest fragments. In six of these bags, native plants and seeds were also included. Six additional islands were selected randomly in the vicinity as the control. The process of evaluation was monitored through the chemical and granulometric soil analysis and surveys of survival, biometrics, floristic and phytosociological vegetation. An improvement in soil properties was observed where the model was implemented, which could be attributed to the substrate and re-vegetation. In the floristic and phytosociological studies, out of the 118 identified species, 65 were observed in the first floristic inventory and 86 in the second floristic inventory with similarities between the subfields of 27.69% and 11.36%, respectively. The influence of the substrate seed bank in the implemented islands was also observed. Increased diversity was only significant in the subareas with the model. It was concluded that this technology was effective in accelerating the succession and promoting the beginning of the restoration.

  1. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 10

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, D.A. [ed.; Fosmire, C.J.; Fowler, R.A. [and others

    1998-09-01

    This document describes the US Department of Energy`s (DOE) Hanford Site environment and is numbered to correspond to the chapters where such information is presented in Hanford Site NEPA related documents. The document is intended to provide a consistent description of the Hanford Site environment for the many NEPA documents that are being prepared by contractors. The two chapters in this document (Chapters 4 and 6) are numbered this way to correspond to the chapters where such information is presented in environmental impact statements (EISs) and other Site-related NEPA or CERCLA documentation. Chapter 4.0 (Affected Environment) describes the Hanford Site environment, and includes information on climate and meteorology, geology, hydrology, ecology, cultural, archaeological and historical resources, socioeconomics, and noise. Chapter 6.0 (Statutory and Regulatory Requirements) describes applicable federal and state laws and regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site.

  2. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.

    1992-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993.

  3. Restoration of forests: environmental challenges in Central and Eastern Europe

    Energy Technology Data Exchange (ETDEWEB)

    Gutkowski, R.M.; Winnicki, T. [eds.] [Colorado State University, Fort Collins, CO (United States). Dept. of Civil Engineering

    1997-12-01

    The workshop examined the environmental factors contributing to the rapid depletion of the forests of central and eastern Europe with a goal of determining a research action plan to help abate the impact, while sustaining or expanding the forests, the economy and energy sufficiency of the region. The proceedings contain a total of 34 papers, under the headings: opening presentation, report of Joint Study Tour, situation papers, state-of-the art papers, and position papers from working groups 1. `Environmental factors in forest depletion`, 2. `Forest-growth, expansion and management`; 3. `Forest utilization of raw materials and value added products`; 4.`Socio-economic considerations for the forest resource, technical excursion to the Bavarian forests, and reports of Working Groups 1-4. Also included are 6 Joint Working Group reports, a report of the joint meeting of Working Group leaders, a final conference report, summary observations and conclusions and closing remarks. Two papers have been indexed separately for the IEA Coal Research CD-ROM.

  4. 78 FR 16656 - Draft Damage Assessment and Restoration Plan and Environmental Assessment for Natural Resource...

    Science.gov (United States)

    2013-03-18

    ... Environmental Conservation, Department of Fish and Game, Department of Natural Resources and Department of Law. The Trustees act on behalf of the public under OPA and State law to protect and restore natural... natural resource damages under OPA and State law. Dated: March 5, 2013. Christopher C. Cartwright...

  5. 77 FR 14418 - Grand Ditch Breach Restoration Draft Environmental Impact Statement, Rocky Mountain National Park...

    Science.gov (United States)

    2012-03-09

    ... wetland communities; aquatic habitat; visitor experience; and long-term resource productivity. DATES: The... environmental impact statement is to guide management actions in the park to restore the hydrological processes... the extent possible, the natural conditions and processes in park units (NPS Management Policies 2006...

  6. 76 FR 13985 - Gulf Spill Restoration Planning; Public Scoping Meetings for the Programmatic Environmental...

    Science.gov (United States)

    2011-03-15

    ... National Oceanic and Atmospheric Administration RIN 0648-XA222 Gulf Spill Restoration Planning; Public Scoping Meetings for the Programmatic Environmental Impact Statement for the Deepwater Horizon Oil Spill... (NOAA), U.S. Department of Commerce. ACTION: Notice of public scoping meetings; correction. SUMMARY:...

  7. 76 FR 11426 - Gulf Spill Restoration Planning; Public Scoping Meetings for the Programmatic Environmental...

    Science.gov (United States)

    2011-03-02

    ... National Oceanic and Atmospheric Administration RIN 0648-XA222 Gulf Spill Restoration Planning; Public Scoping Meetings for the Programmatic Environmental Impact Statement for the Deepwater Horizon Oil Spill...), U.S. Department of Commerce. ACTION: Notice; public scoping meetings. SUMMARY: In a February...

  8. 78 FR 8184 - DEEPWATER HORIZON Oil Spill; Final Phase II Early Restoration Plan and Environmental Review

    Science.gov (United States)

    2013-02-05

    ... Early Restoration Plan and Environmental Review (Phase II ERP/ER) describing the second set of... availability of the Phase II ERP/ER. ADDRESSES: Obtaining Documents: You may download the Phase II ERP/ER and... the Phase II ERP/ER at any of the public repositories listed at...

  9. Environmental awareness and public support for protecting and restoring Puget sound.

    Science.gov (United States)

    Safford, Thomas G; Norman, Karma C; Henly, Megan; Mills, Katherine E; Levin, Phillip S

    2014-04-01

    In an effort to garner consensus around environmental programs, practitioners have attempted to increase awareness about environmental threats and demonstrate the need for action. Nonetheless, how beliefs about the scope and severity of different types of environmental concerns shape support for management interventions are less clear. Using data from a telephone survey of residents of the Puget Sound region of Washington, we investigate how perceptions of the severity of different coastal environmental problems, along with other social factors, affect attitudes about policy options. We find that self-assessed environmental understanding and views about the seriousness of pollution, habitat loss, and salmon declines are only weakly related. Among survey respondents, women, young people, and those who believe pollution threatens Puget Sound are more likely to support policy measures such as increased enforcement and spending on restoration. Conversely, self-identified Republicans and individuals who view current regulations as ineffective tend to oppose governmental actions aimed at protecting and restoring Puget Sound. Support for one policy measure-tax credits for environmentally-friendly business practices-is not significantly affected by political party affiliation. These findings demonstrate that environmental awareness can influence public support for environmental policy tools. However, the nature of particular management interventions and other social forces can have important mitigating effects and need to be considered by practitioners attempting to develop environment-related social indicators and generate consensus around the need for action to address environmental problems.

  10. Environmental Awareness and Public Support for Protecting and Restoring Puget Sound

    Science.gov (United States)

    Safford, Thomas G.; Norman, Karma C.; Henly, Megan; Mills, Katherine E.; Levin, Phillip S.

    2014-04-01

    In an effort to garner consensus around environmental programs, practitioners have attempted to increase awareness about environmental threats and demonstrate the need for action. Nonetheless, how beliefs about the scope and severity of different types of environmental concerns shape support for management interventions are less clear. Using data from a telephone survey of residents of the Puget Sound region of Washington, we investigate how perceptions of the severity of different coastal environmental problems, along with other social factors, affect attitudes about policy options. We find that self-assessed environmental understanding and views about the seriousness of pollution, habitat loss, and salmon declines are only weakly related. Among survey respondents, women, young people, and those who believe pollution threatens Puget Sound are more likely to support policy measures such as increased enforcement and spending on restoration. Conversely, self-identified Republicans and individuals who view current regulations as ineffective tend to oppose governmental actions aimed at protecting and restoring Puget Sound. Support for one policy measure—tax credits for environmentally-friendly business practices—is not significantly affected by political party affiliation. These findings demonstrate that environmental awareness can influence public support for environmental policy tools. However, the nature of particular management interventions and other social forces can have important mitigating effects and need to be considered by practitioners attempting to develop environment-related social indicators and generate consensus around the need for action to address environmental problems.

  11. Environmental restoration: Integrating hydraulic control of groundwater, innovative contaminant removal technologies and wetlands restoration--A case study at SRS

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, C.M.; Serkiz, S.M.; Adams, J.; Welty, M. (Westinghouse Savannah River Co., Aiken, SC (United States))

    1992-01-01

    The groundwater remediation program at the F and H Seepage Basins, Savannah River Sits (SRS) is a case study of the integration of various environmental restoration technologies at a single waste site. Hydraulic control measures are being designed to mitigate the discharge of groundwater plumes to surface water. One of the primary constituents of the plumes is tritium. An extraction and reinjection scenario is being designed to keep the tritium in circulation in the shallow groundwater, until it can naturally decay. This will be accomplished by extracting groundwater downgradient of the waste sites, treatment, and reinjection of the tritiated water into the water table upgradient of the basins. Innovative in-situ technologies, including electrolytic migration, are being field tested at the site to augment the pump-treat-reinject system. The in-situ technologies target removal of contaminants which are relatively immobile, yet represent long term risks to human health and the environment. Wetland restoration is an integral part of the F and H remediation program. Both in-situ treatment of the groundwater discharging the wetlands to adjust the pH, and replacement of water loss due to the groundwater extraction program ar being considered. Toxicity studies indicate that drought and the effects of low pH groundwater discharge have been factors in observed tree mortality in wetlands near the waste sites.

  12. ITEP: A survey of innovative environmental restoration technologies in the Netherlands and France

    Energy Technology Data Exchange (ETDEWEB)

    Roberds, W.J.; Voss, C.F.; Hitchcock, S.A. [Golder Associates, Inc., Redmond, WA (United States)

    1995-05-01

    The International Technology Exchange Program (ITEP) of the Department of Energy`s (DOE`s) Office of Environmental Management (EM) is responsible for promoting the import of innovative technologies to better address EM`s needs and the export of US services into foreign markets to enhance US competitiveness. Under this program, potentially innovative environmental restoration technologies, either commercially available or under development in the Netherlands and France, were identified, described, and evaluated. It was found that 12 innovative environmental restoration technologies, which are either commercially available or under development in the Netherlands and France, may have some benefit for the DOE EM program and should be considered for transfer to the United States.

  13. Qualitative risk evaluation of environmental restoration programs at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Morris, S.C.

    1996-05-01

    This report documents the evaluation of risks associated with environmental restoration activities at Brookhaven National Laboratory using two tools supplied by DOE to provide a consistent set of risk estimates across the DOE complex: Risk Data Sheets (RDS) and Relative Risk Ranking. The tools are described, the process taken characterized, results provided and discussed. The two approaches are compared and recommendations provided for continuing improvement of the process.

  14. Soil bio-engineering for risk mitigation and environmental restoration in a humid tropical area

    OpenAIRE

    PETRONE, A.; Preti, F.

    2009-01-01

    The use of soil bio-engineering techniques in developing countries is a relevant issue for disaster mitigation, environmental restoration and poverty reduction. Research on authochtonal plants suitable for this kind of works and on economic efficiency is essential for the divulgation of such techniques. The present paper is focused on this two issues related to the realization of various typologies of soil bio-engineering works in the humid tropic of Nicaragua.


    ...

  15. Soil bioengineering for risk mitigation and environmental restoration in a humid tropical area

    OpenAIRE

    PETRONE, A.; Preti, F.

    2010-01-01

    The use of soil bio-engineering techniques in developing countries is a relevant issue for disaster mitigation, environmental restoration and poverty reduction. Research on the autochthonal plants suitable for these kinds of interventions and on the economic efficiency of the interventions is essential for the dissemination of such techniques. The present paper is focused on these two issues as related to the realization of various typologies of soil bioengineering works in the humid tropics ...

  16. Current Changes in Pubertal Timing: Revised Vision in Relation with Environmental Factors Including Endocrine Disruptors.

    Science.gov (United States)

    Parent, Anne-Simone; Franssen, Delphine; Fudvoye, Julie; Pinson, Anneline; Bourguignon, Jean-Pierre

    2016-01-01

    The aim of this chapter is to revise some common views on changes in pubertal timing. This revision is based on recent epidemiological findings on the clinical indicators of pubertal timing and data on environmental factor effects and underlying mechanisms. A current advancement in timing of female puberty is usually emphasized. It appears, however, that timing is also changing in males. Moreover, the changes are towards earliness for initial pubertal stages and towards lateness for final stages in both sexes. Such observations indicate the complexity of environmental influences on pubertal timing. The mechanisms of changes in pubertal timing may involve both the central neuroendocrine control and peripheral effects at tissues targeted by gonadal steroids. While sufficient energy availability is a clue to the mechanism of pubertal development, changes in the control of both energy balance and reproduction may vary under the influence of common determinants such as endocrine-disrupting chemicals (EDCs). These effects can take place right before puberty as well as much earlier, during fetal and neonatal life. Finally, environmental factors can interact with genetic factors in determining changes in pubertal timing. Therefore, the variance in pubertal timing is no longer to be considered under absolutely separate control by environmental and genetic determinants. Some recommendations are provided for evaluation of EDC impact in the management of pubertal disorders and for possible reduction of EDC exposure along the precautionary principle.

  17. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  18. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-15

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

  19. Payments for environmental services in Latin America as a tool for restoration and rural development.

    Science.gov (United States)

    Montagnini, Florencia; Finney, Christopher

    2011-05-01

    Payments for Environmental Services (PES) can encourage projects that enhance restoration, production, and rural development. When projects promote differentiated systems by paying farmers for the provision of services, the application of PES requires evaluation of the environmental services provided by each system. We present evaluations of carbon stocks and biodiversity in pure and mixed native tree plantations in Costa Rica. To illustrate how monetary values can be assigned, we discuss a project that awarded PES to silvopastoral systems in Costa Rica, Nicaragua, and Colombia based on carbon stocks and biodiversity. PES can promote positive environmental attitudes in farmers. Currently this project is being scaled up in Colombia based on their positive experiences with PES as a tool to promote adoption. Compared to PES systems that include only one environmental service, systems that incorporate bundling or layering of multiple services can make sustainable land uses more attractive to farmers and reduce perverse incentives.

  20. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs.

  1. The Department of Energy, Office of Environmental Restoration and Waste Management: Project performance study

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The Office of Environmental Restoration and Waste Management (EM) of the US Department of Energy commissioned Independent Project Analysis, Inc. (IPA) to perform this Project Performance Study to provide a quantitative analysis determining how well EM develops and executes environmental remediation and waste management projects. The approach consisted of collecting detailed data on a sample of 65 completed and ongoing EM projects conducted since 1984. These data were then compared with key project characteristics and outcomes from 233 environmental remediation projects (excluding EM) in IPA`s Environmental Remediation Database and 951 projects In IPA`s Capital Projects Database. The study establishes the standing of the EM system relative to other organizations, and suggests areas and opportunities for improvement.

  2. Preliminary environmental assessment for the Satellite Power System (SPS). Revision 1. Volume 2. Detailed assessment

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    The Department of Energy (DOE) is considering several options for generating electrical power to meet future energy needs. The satellite power system (SPS), one of these options, would collect solar energy through a system of satellites in space and transfer this energy to earth. A reference system has been described that would convert the energy to microwaves and transmit the microwave energy via directive antennas to large receiving/rectifying antennas (rectennas) located on the earth. At the rectennas, the microwave energy would be converted into electricity. The potential environmental impacts of constructing and operating the satellite power system are being assessed as a part of the Department of Energy's SPS Concept Development and Evaluation Program. This report is Revision I of the Preliminary Environmental Assessment for the Satellite Power System published in October 1978. It refines and extends the 1978 assessment and provides a basis for a 1980 revision that will guide and support DOE recommendations regarding future SPS development. This is Volume 2 of two volumes. It contains the technical detail suitable for peer review and integrates information appearing in documents referenced herein. The key environmental issues associated with the SPS concern human health and safety, ecosystems, climate, and electromagnetic systems interactions. In order to address these issues in an organized manner, five tasks are reported: (I) microwave-radiation health and ecological effects; (II) nonmicrowave health and ecological effectss; (III) atmospheric effects; (IV) effects on communication systems due to ionospheric disturbance; and (V) electromagnetic compatibility. (WHK)

  3. Optimizing environmental flows for multiple reaches affected by a multipurpose reservoir system in Taiwan: Restoring natural flow regimes at multiple temporal scales

    Science.gov (United States)

    Shiau, Jenq-Tzong; Wu, Fu-Chun

    2013-01-01

    For reservoirs that are operated for multiple purposes such as water supply, flood control, and power generation, any attempts to incorporate environmental flow targets in the reservoir operation rules need to take into account both the human and ecosystem demands. To date, however, none of the reservoir operation schemes that consider environmental flow requirements includes subdaily flow regimes and is able to optimize for multiple reaches. Here, we address the temporal and spatial issues associated with the optimal environmental flow and operation strategies for a multipurpose reservoir system in Taiwan. We propose an environmental flow proportion strategy and three-period release approach, and multireach operation scenarios that simultaneously optimize reservoir performances and environmental flow objectives at subdaily to interannual timescales for a maximum of three connected reaches. Our results imply that taking into account the environmental flow objectives does not necessarily degrade the overall reservoir performance due to the positive effect on flood control, which in turn would compensate for the adverse effects on domestic water supply and hydropower generation. The three-period release approach benefits mainly the subdaily flow regime, while the environmental flow proportion strategy benefits primarily the daily flow regime. Spatially, a mutual exclusion is observed between the reaches above and below a diversion weir, a fact that revises the conventional perception that restoring the flow regimes of a downstream reach would automatically restore those of upstream reaches. An overall evaluation reveals that the three-reach scenario outperforms the two-reach scenarios, which then outperform the one-reach scenarios. The one- or two-reach scenario that incorporates the midstream reach may be taken as an alternative because such scenario would benefit the upstream or downstream reach in addition to the midstream reach.

  4. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 496: Buried Rocket Site, Antelope Lake, Tonopah Test Range

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    2004-05-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan details the activities necessary to close Corrective Action Unit 496: Buried Rocket Site, Antelope Lake. CAU 496 consists of one site located at the Tonopah Test Range, Nevada.

  5. Oak Ridge Environmental Information System (ORIES) site workstation information packet for OREIS V1.2. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Voorhees, L.D.; McCord, R.A.; Durfee, R.C.; Land, M.L.; Olson, R.J.; Palmer, M.R.; Thomas, J.K.; Tinnel, E.P.; Zygmunt, B.C.

    1993-02-01

    The OREIS site workstation information packet was developed to accompany the OREIS site workstations, which are being delivered to the Environmental Restoration programs at the five DOE-OR sites. The packet is written specifically for the Site ER program staff at each of the five Sites who have been designated the OREIS contact by their ER program manager, and is not intended for general distribution. The packet provides an overview of the components of OREIS, points to more detailed information provided in the accompanying vendor and OREIS developed manuals, and includes information on training opportunities and user support.

  6. Poverty Alleviation and Environmental Restoration Using the Clean Development Mechanism: A Case Study from Humbo, Ethiopia

    Science.gov (United States)

    Brown, Douglas R.; Dettmann, Paul; Rinaudo, Tony; Tefera, Hailu; Tofu, Assefa

    2011-08-01

    Poverty, hunger and demand for agricultural land have driven local communities to overexploit forest resources throughout Ethiopia. Forests surrounding the township of Humbo were largely destroyed by the late 1960s. In 2004, World Vision Australia and World Vision Ethiopia identified forestry-based carbon sequestration as a potential means to stimulate community development while engaging in environmental restoration. After two years of consultation, planning and negotiations, the Humbo Community-based Natural Regeneration Project began implementation—the Ethiopian organization's first carbon sequestration initiative. The Humbo Project assists communities affected by environmental degradation including loss of biodiversity, soil erosion and flooding with an opportunity to benefit from carbon markets while reducing poverty and restoring the local agroecosystem. Involving the regeneration of 2,728 ha of degraded native forests, it brings social, economic and ecological benefits—facilitating adaptation to a changing climate and generating temporary certified emissions reductions (tCERs) under the Clean Development Mechanism. A key feature of the project has been facilitating communities to embrace new techniques and take responsibility for large-scale environmental change, most importantly involving Farmer Managed Natural Regeneration (FMNR). This technique is low-cost, replicable, and provides direct benefits within a short time. Communities were able to harvest fodder and firewood within a year of project initiation and wild fruits and other non-timber forest products within three years. Farmers are using agroforestry for both environmental restoration and income generation. Establishment of user rights and local cooperatives has generated community ownership and enthusiasm for this project—empowering the community to more sustainably manage their communal lands.

  7. Poverty alleviation and environmental restoration using the clean development mechanism: A case study from Humbo, Ethiopia.

    Science.gov (United States)

    Brown, Douglas R; Dettmann, Paul; Rinaudo, Tony; Tefera, Hailu; Tofu, Assefa

    2011-08-01

    Poverty, hunger and demand for agricultural land have driven local communities to overexploit forest resources throughout Ethiopia. Forests surrounding the township of Humbo were largely destroyed by the late 1960s. In 2004, World Vision Australia and World Vision Ethiopia identified forestry-based carbon sequestration as a potential means to stimulate community development while engaging in environmental restoration. After two years of consultation, planning and negotiations, the Humbo Community-based Natural Regeneration Project began implementation--the Ethiopian organization's first carbon sequestration initiative. The Humbo Project assists communities affected by environmental degradation including loss of biodiversity, soil erosion and flooding with an opportunity to benefit from carbon markets while reducing poverty and restoring the local agroecosystem. Involving the regeneration of 2,728 ha of degraded native forests, it brings social, economic and ecological benefits--facilitating adaptation to a changing climate and generating temporary certified emissions reductions (tCERs) under the Clean Development Mechanism. A key feature of the project has been facilitating communities to embrace new techniques and take responsibility for large-scale environmental change, most importantly involving Farmer Managed Natural Regeneration (FMNR). This technique is low-cost, replicable, and provides direct benefits within a short time. Communities were able to harvest fodder and firewood within a year of project initiation and wild fruits and other non-timber forest products within three years. Farmers are using agroforestry for both environmental restoration and income generation. Establishment of user rights and local cooperatives has generated community ownership and enthusiasm for this project--empowering the community to more sustainably manage their communal lands.

  8. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  9. Hanford Site National Environmental Policy Act (NEPA) Characterization Report, Revision 17

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Bunn, Amoret L.; Cannon, Sandra D.; Duncan, Joanne P.; Fowler, Richard A.; Fritz, Brad G.; Harvey, David W.; Hendrickson, Paul L.; Hoitink, Dana J.; Horton, Duane G.; Last, George V.; Poston, Ted M.; Prendergast-Kennedy, Ellen L.; Reidel, Steve P.; Rohay, Alan C.; Sackschewsky, Michael R.; Scott, Michael J.; Thorne, Paul D.

    2005-09-30

    This document describes the U.S. Department of Energy’s (DOE) Hanford Site environment. It is updated each year and is intended to provide a consistent description of the Hanford Site environment for the many environmental documents being prepared by DOE contractors concerning the National Environmental Policy Act (NEPA). No statements about significance or environmental consequences are provided. This year’s report is the seventeenth revision of the original document published in 1988 and is (until replaced by the eighteenth revision) the only version that is relevant for use in the preparation of Hanford NEPA, State Environmental Policy Act (SEPA), and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) documents. The two chapters included in this document (Chapters 4 and 6) are numbered to correspond to the chapters where such information is typically presented in environmental impact statements (EISs) and other Hanford Site NEPA or CERCLA documentation. Chapter 4.0 (Affected Environment) describes Hanford Site climate and meteorology; air quality; geology; hydrology; ecology; cultural, archaeological, and historical resources; socioeconomics; noise; and occupational health and safety. Sources for extensive tabular data related to these topics are provided in the chapter. Most subjects are divided into a general description of the characteristics of the Hanford Site, followed by site-specific information, where available, of the 100, 200, 300, and other areas. This division allows the reader to go directly to those sections of particular interest. When specific information on each of these separate areas is not complete or available, the general Hanford Site description should be used. Chapter 6.0 (Statutory and Regulatory Requirements) describes federal and state laws and regulations, DOE directives and permits, and presidential executive orders that are applicable to the NEPA documents prepared for Hanford Site activities

  10. Proceedings of Workshop on Uranium Production Environmental Restoration: An exchange between the United States and Germany

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    Scientists, engineers, elected officials, and industry regulators from the United, States and Germany met in Albuquerque, New Mexico, August 16--20, 1993, in the first joint international workshop to discuss uranium tailings remediation. Entitled ``Workshop on Uranium Production Environmental Restoration: An Exchange between the US and Germany,`` the meeting was hosted by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The goal of the workshop was to further understanding and communication on the uranium tailings cleanup projects in the US and Germany. Many communities around the world are faced with an environmental legacy -- enormous quantities of hazardous and low-level radioactive materials from the production of uranium used for energy and nuclear weapons. In 1978, the US Congress passed the Uranium Mill Tailings Radiation Control Act. Title I of the law established a program to assess the tailings at inactive uranium processing sites and provide a means for joint federal and state funding of the cleanup efforts at sites where all or substantially all of the uranium was produced for sale to a federal agency. The UMTRA Project is responsible for the cleanup of 24 sites in 10 states. Germany is facing nearly identical uranium cleanup problems and has established a cleanup project. At the workshop, participants had an opportunity to interact with a broad cross section of the environmental restoration and waste disposal community, discuss common concerns and problems, and develop a broader understanding of the issues. Abstracts are catalogued individually for the data base.

  11. Study on Key Problems of a New Environmental Dredging Based on Ecological Protection and Subsequent Ecological Restoration

    Institute of Scientific and Technical Information of China (English)

    HU; Wei

    2012-01-01

    [Objective] The research aimed to study key problems of a new environmental dredging based on ecological protection and subsequent ecological restoration. [Method] People paid more attention to sediment pollutant removal in environmental dredging, without considering coming aquatic eco-restoration work after dredging. Factor affecting aquatic ecosystem existence and growth was screened, and ecological dredging manner was put forward. [Result] On the basis of analyzing dredging objective, effect and influence, started from ecological protection and subsequent ecological restoration, water depth and substrate were screened as priority control factors of the environmental sediment dredging. New manner of combining sediment dredging to reshape underwater terrain was put forward. [Conclusion] The research provided solution for water depth and substrate demands of the subsequent ecological restoration.

  12. Strategic plan strategy of the Oak Ridge National Laboratory Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report provides information about the use of an integrated strategic plan, strategy, and life-cycle baseline in the long range planning and risk process employed by the environmental restoration program at the Oak Ridge National Laboratory (ORNL). Long-range planning is essential because the ER Program encompasses hundreds of sites; will last several decades; and requires complex technology, management, and policy. Long-range planning allows a focused, cost-effective approach to identify and meet Program objectives. This is accomplished through a strategic plan, a strategy, and a life-cycle baseline. This long-range methodology is illustrated below.

  13. Strategic plan strategy of the Oak Ridge National Laboratory Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report provides information about the use of an integrated strategic plan, strategy, and life-cycle baseline in the long range planning and risk process employed by the environmental restoration program at the Oak Ridge National Laboratory (ORNL). Long-range planning is essential because the ER Program encompasses hundreds of sites; will last several decades; and requires complex technology, management, and policy. Long-range planning allows a focused, cost-effective approach to identify and meet Program objectives. This is accomplished through a strategic plan, a strategy, and a life-cycle baseline. This long-range methodology is illustrated below.

  14. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  15. Requirements for quality control of analytical data for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Engels, J.

    1992-12-01

    The Environmental Restoration (ER) Program was established for the investigation and remediation of inactive US Department of Energy (DOE) sites and facilities that have been declared surplus in terms of their previous uses. The purpose of this document is to Specify ER requirements for quality control (QC) of analytical data. Activities throughout all phases of the investigation may affect the quality of the final data product, thus are subject to control specifications. Laboratory control is emphasized in this document, and field concerns will be addressed in a companion document Energy Systems, in its role of technical coordinator and at the request of DOE-OR, extends the application of these requirements to all participants in ER activities. Because every instance and concern may not be addressed in this document, participants are encouraged to discuss any questions with the ER Quality Assurance (QA) Office, the Analytical Environmental Support Group (AESG), or the Analytical Project Office (APO).

  16. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  17. Information management architecture for an integrated computing environment for the Environmental Restoration Program. Environmental Restoration Program, Volume 3, Interim technical architecture

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This third volume of the Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program--the Interim Technical Architecture (TA) (referred to throughout the remainder of this document as the ER TA)--represents a key milestone in establishing a coordinated information management environment in which information initiatives can be pursued with the confidence that redundancy and inconsistencies will be held to a minimum. This architecture is intended to be used as a reference by anyone whose responsibilities include the acquisition or development of information technology for use by the ER Program. The interim ER TA provides technical guidance at three levels. At the highest level, the technical architecture provides an overall computing philosophy or direction. At this level, the guidance does not address specific technologies or products but addresses more general concepts, such as the use of open systems, modular architectures, graphical user interfaces, and architecture-based development. At the next level, the technical architecture provides specific information technology recommendations regarding a wide variety of specific technologies. These technologies include computing hardware, operating systems, communications software, database management software, application development software, and personal productivity software, among others. These recommendations range from the adoption of specific industry or Martin Marietta Energy Systems, Inc. (Energy Systems) standards to the specification of individual products. At the third level, the architecture provides guidance regarding implementation strategies for the recommended technologies that can be applied to individual projects and to the ER Program as a whole.

  18. Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

    1995-11-01

    This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program.

  19. Climate change in the four corners and adjacent regions: Implications for environmental restoration and land-use planning

    Energy Technology Data Exchange (ETDEWEB)

    Waugh, W.J. [ed.

    1995-09-01

    This document contains the workshop proceedings on Climate Change in the Four Corners and Adjacent Regions: Implications for Environmental Restoration and Land-Use Planning which took place September 12-14, 1994 in Grand Junction, Colorado. The workshop addressed three ways we can use paleoenvironmental data to gain a better understanding of climate change and its effects. (1) To serve as a retrospective baseline for interpreting past and projecting future climate-induced environmental change, (2) To differentiate the influences of climate and humans on past environmental change, and (3) To improve ecosystem management and restoration practices in the future. The papers presented at this workshop contained information on the following subjects: Paleoclimatic data from the Pleistocene and Holocene epochs, climate change and past cultures, and ecological resources and environmental restoration. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  20. Environmental assessment of the Environmental Restoration Project at Sandia National Laboratories/New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Sandia National Laboratories/New Mexico (SNL/NM) is managed and operated for the U.S. Department of Energy (DOE) by Sandia Corporation, a subsidiary of the Lockheed Martin Company. SNL/NM is located on land controlled by DOE within the boundaries of Kirtland Air Force Base (KAFB) in Albuquerque, New Mexico. The major responsibilities of SNL/NM are the support of national security and energy projects. This report provides an environmental assessment of proposed remedial action activities at the solid waste management units at SNL/NM. A risk assessment of health hazards is also discussed.

  1. Healing the Earth: Through Programs in Environmental Restoration and Waste Management, the Tribal Colleges Are Working Together to Solve the Nation's Most Pressing Environmental Needs.

    Science.gov (United States)

    Cordero, Carlos

    1992-01-01

    Describes "Promoting Environmental Restoration/Management for American Indians" (PERMA), a joint effort of all Indian controlled colleges to create certificate programs in environmental and waste management. PERMA includes a summer bridge program to build science/math skills; a core academic transfer curriculum; a vocationally oriented two-year…

  2. Planned revision to DOE Order 5820.2A, Radioactive Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, G.J. [Dept. of Energy, Washington, DC (United States); Williams, R.E.; Kudera, D.E. [EG and G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.; Bailey, D.E. [NJG, Inc. (United States)

    1993-03-01

    US Department of Energy Headquarters initiated efforts to revise DOE Order 5820.2A, ``Radioactive Waste Management``. The purpose of the revision is to enhance DOE waste management requirements, reflect new DOE organizational responsibilities, and consolidate requirements for management of all waste, under the responsibility of Environmental Restoration and Waste Management, into a single order. This paper discusses the revision philosophy, objectives of the revision, and strategy for the revision. Issues being considered for inclusion in the revision and recommended methods of resolving each issue are also discussed.

  3. Second annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clapp, R.B.; Watts, J.A. [eds.

    1993-09-01

    This report summarizes the salient features of the annual efforts of environmental monitoring and field investigations conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, striving to provide an ORNL site-wide perspective on types, distribution, and transport of contamination. Results are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) program. WAG 2 is the lower portion of the White Oak Creek (WOC) system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The remedial investigation for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2`s role as an integrator and conduit of contaminants from the ORNL site. This report also includes information from other site-specific remedial investigations and feasibility studies (RI/FS) for contaminated sites at ORNL and data from other ongoing monitoring programs conducted by other organizations [e.g., the National Pollutant Discharge Elimination System (NPDES) compliance monitoring conducted by the Environmental Surveillance and Protection Section]. This information is included to provide an integrated basis to support ER decision making. This report summarizes information gathered through early 1993. Annual data, such as annual discharges of contaminants, are reported for calendar year 1992.

  4. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  5. Multinomial-Regression Modeling of the Environmental Attitudes of Higher Education Students Based on the Revised New Ecological Paradigm Scale

    Science.gov (United States)

    Jowett, Tim; Harraway, John; Lovelock, Brent; Skeaff, Sheila; Slooten, Liz; Strack, Mick; Shephard, Kerry

    2014-01-01

    Higher education is increasingly interested in its impact on the sustainability attributes of its students, so we wanted to explore how our students' environmental concern changed during their higher education experiences. We used the Revised New Ecological Paradigm Scale (NEP) with 505 students and developed and tested a multinomial…

  6. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  7. Stakeholder Interaction in Participatory Land Restoration in Iceland: Environmental Officers' Challenges and Strategies

    Science.gov (United States)

    Berglund, Brita; Hallgren, Lars; Aradóttir, Ása L.

    2015-08-01

    Participatory approaches involve stakeholder interaction but environmental agency employees engaged in participatory undertakings often lack training for interaction tasks. This study explored how district officers at the Soil Conservation Service of Iceland (SCSI) experienced and dealt with stakeholder interaction in participatory land restoration. We made semi-structured interviews with all district officers with at least 1-year experience; seven in total. A thematic content analysis revealed five challenges facing the officers in their interaction activities and seven strategies that they used to deal with these challenges. The core challenge was to establish and maintain contacts with farmers and other stakeholders as it enabled the SCSI to support and influence their land restoration practices. Other challenges were to: accomplish SCSI's objectives; represent the SCSI and the government; have adequate skills, knowledge, and background; and deal with one's own emotions. Four of the strategies seemed to promote collaboration: create win-win scenarios; "go local"; direct and positive communication; and motivation and knowledge sharing. The other strategies: supportive district officer team; self-reliance and personal background; and self-control supported the officers in their interaction tasks. Factors undermining their collaboration efforts included insufficient time and other resources, an unsupportive organizational culture and a legal duty to assess the condition of vegetation cover on farmland. Increased resource allocation to the SCSI's local operations, more attention to emotional issues, and efforts to develop a more flexible and learning organizational culture that supports collaboration could counteract these factors.

  8. Flood protection as a key-component of the environmental restoration of Canal del Dique, Colombia

    Directory of Open Access Journals (Sweden)

    Sokolewicz Marius

    2016-01-01

    Full Text Available Canal del Dique is a man-made distributary of Rio Magdalena. After its widening in 1980’s environmental degradation caused by abundant sediment load and changes to hydrology took a catastrophic form. In 2010, the Canal’s dike breached and 35,000 ha of land were flooded. In 2013 a huge effort to restore the environment in the Canal del Dique system and to flood-proof the villages was started. An integrated approach was adopted to provide an optimal solution for flood control, environment, fresh water supply and navigation. In order to prepare restoration plans, an extensive hydrologic and hydraulic assessment was carried out. 1D, 2D and 3D numerical models were developed to answer different questions, to evaluate different alternatives and to enable selection of optimal solutions. To assess the flood risk, a hindcast of 2010 flood was carried out. A solution was designed in which the inlet of water from the Magdalena River is regulated by a control structure, managed by an automated system based on SCADA and Delft-FEWS flood forecasting software and advanced statistics.

  9. Stakeholder Interaction in Participatory Land Restoration in Iceland: Environmental Officers' Challenges and Strategies.

    Science.gov (United States)

    Berglund, Brita; Hallgren, Lars; Aradóttir, Ása L

    2015-08-01

    Participatory approaches involve stakeholder interaction but environmental agency employees engaged in participatory undertakings often lack training for interaction tasks. This study explored how district officers at the Soil Conservation Service of Iceland (SCSI) experienced and dealt with stakeholder interaction in participatory land restoration. We made semi-structured interviews with all district officers with at least 1-year experience; seven in total. A thematic content analysis revealed five challenges facing the officers in their interaction activities and seven strategies that they used to deal with these challenges. The core challenge was to establish and maintain contacts with farmers and other stakeholders as it enabled the SCSI to support and influence their land restoration practices. Other challenges were to: accomplish SCSI's objectives; represent the SCSI and the government; have adequate skills, knowledge, and background; and deal with one's own emotions. Four of the strategies seemed to promote collaboration: create win-win scenarios; "go local"; direct and positive communication; and motivation and knowledge sharing. The other strategies: supportive district officer team; self-reliance and personal background; and self-control supported the officers in their interaction tasks. Factors undermining their collaboration efforts included insufficient time and other resources, an unsupportive organizational culture and a legal duty to assess the condition of vegetation cover on farmland. Increased resource allocation to the SCSI's local operations, more attention to emotional issues, and efforts to develop a more flexible and learning organizational culture that supports collaboration could counteract these factors.

  10. Integration of Environmental Restoration and Decontamination and Dismantlement Requirements at the INEEL

    Energy Technology Data Exchange (ETDEWEB)

    Kuhns, Douglass Jack; Reese, Craig Lyle

    1999-03-01

    In 1997, the Environmental Restoration Program at the Idaho National Engineering and Environmental Laboratory (INEEL) determined that it was necessary to remediate a Comprehensive Environmental Response and Liability Act (CERCLA) site to address the risk of subsurface petroleum contamination to human health and the environment. This cleanup project was conducted utilizing the Non-time Critical Removal Action process. Due to the close proximity (above the contaminated soil) of a number of above ground storage tanks and a building, the CERCLA project team worked closely with the D&D group to ensure all requirements for each program were met. Lessons learned and regulatory requirements will be discussed in the paper, including the factors unknown to many ER personnel regarding the steps required to be completed prior to the dismantlement of structures. The paper will summarize the background associated with the site, why the removal action was conducted, the scope of the removal action, and the results. The emphasis of the paper will discuss the integration between ER and D&D requirements and processes. In the current environment where ER and D&D activities are commingled, it is imperative that ER and D&D personnel are aware of the requirements imposed upon each program. By working together and building upon the strengths of each program, the INEEL’s 1997 removal action was a tremendous success.

  11. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  12. Survey of subsurface treatment technologies for environmental restoration sites at Sandia National Laboratories, New Mexico.

    Energy Technology Data Exchange (ETDEWEB)

    McGrath, Lucas K.; Ho, Clifford Kuofei; Wright, Jerome L.

    2003-08-01

    This report provides a survey of remediation and treatment technologies for contaminants of concern at environmental restoration (ER) sites at Sandia National Laboratories, New Mexico. The sites that were evaluated include the Tijeras Arroyo Groundwater, Technical Area V, and Canyons sites. The primary contaminants of concern at these sites include trichloroethylene (TCE), tetrachloroethylene (PCE), and nitrate in groundwater. Due to the low contaminant concentrations (close to regulatory limits) and significant depths to groundwater ({approx}500 feet) at these sites, few in-situ remediation technologies are applicable. The most applicable treatment technologies include monitored natural attenuation and enhanced bioremediation/denitrification to reduce the concentrations of TCE, PCE, and nitrate in the groundwater. Stripping technologies to remove chlorinated solvents and other volatile organic compounds from the vadose zone can also be implemented, if needed.

  13. Environmental Restoration and Waste Management manpower needs assessment: US Department of Energy complex

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, C.W.; Lewis, R.E.; Hunt, S.T. (Pacific Northwest Lab., Richland, WA (United States)); Finn, M.G. (Oak Ridge Associated Universities, Inc., TN (United States))

    1992-06-01

    A study was conducted Pacific Northwest Laboratory and Oak Ridge Associated Universities, Inc. to assess the supply and demand for 53 scientific, engineering, and technical occupations relevant to the US Department of Energy's (DOE's) Office of Environmental Restoration and Waste management (EM). These assessments were made by examining budget projections and the input of program/project and human resources managers throughout the DOE complex. Quantitative projections of full-time equivalent employees slots for each occupation have been developed for the 1993--1997 time frame. Qualitative assessments of the factors that affect recruitment, staffing, and retention are also reported. The implications of the study are discussed within the likely skills mix of the future workforce and the education and organization interventions most likely to address the needs of the DOE complex.

  14. Environmental Restoration and Waste Management manpower needs assessment: US Department of Energy complex

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, C.W.; Lewis, R.E.; Hunt, S.T. [Pacific Northwest Lab., Richland, WA (United States); Finn, M.G. [Oak Ridge Associated Universities, Inc., TN (United States)

    1992-06-01

    A study was conducted Pacific Northwest Laboratory and Oak Ridge Associated Universities, Inc. to assess the supply and demand for 53 scientific, engineering, and technical occupations relevant to the US Department of Energy`s (DOE`s) Office of Environmental Restoration and Waste management (EM). These assessments were made by examining budget projections and the input of program/project and human resources managers throughout the DOE complex. Quantitative projections of full-time equivalent employees slots for each occupation have been developed for the 1993--1997 time frame. Qualitative assessments of the factors that affect recruitment, staffing, and retention are also reported. The implications of the study are discussed within the likely skills mix of the future workforce and the education and organization interventions most likely to address the needs of the DOE complex.

  15. Environmental restoration and waste management department independent safety review committee program management plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    This Program Management Plan (PMP) describes and governs the Independent Safety Review Committee (ISRC) established within the Environmental Restoration and Waste Management Department (ER WMD). The ISRC performs independent safety reviews for the ER WMD as required and specified by the governing documents mentioned above. This PMP defines the ISRC organization, work plan, and scope of work. The PMP is organized consistent with the requirements of DOE Order 4700.1, Project Management System. For the purpose of readability, this document shall use the term program'' to include not only the chartered activities of the ISRC, but also the related activities conducted by the chairman and staff. This PMP is subordinate to the ER WMD Implementing Program Management Plan, EGG-WM-10220.

  16. Environmental restoration and waste management department independent safety review committee program management plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    This Program Management Plan (PMP) describes and governs the Independent Safety Review Committee (ISRC) established within the Environmental Restoration and Waste Management Department (ER&WMD). The ISRC performs independent safety reviews for the ER&WMD as required and specified by the governing documents mentioned above. This PMP defines the ISRC organization, work plan, and scope of work. The PMP is organized consistent with the requirements of DOE Order 4700.1, Project Management System. For the purpose of readability, this document shall use the term ``program`` to include not only the chartered activities of the ISRC, but also the related activities conducted by the chairman and staff. This PMP is subordinate to the ER&WMD Implementing Program Management Plan, EGG-WM-10220.

  17. Clinch River - Environmental Restoration Program (CR-ERP) pilot study, ambient water toxicity

    Energy Technology Data Exchange (ETDEWEB)

    Simbeck, D.J.

    1997-06-01

    Clinch River - Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a pilot study during the week of April 22-29, 1993, prior to initiation of CR-ERP Phase II Sampling and Analysis activities as described in the Statement of Work (SOW) document. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected by TVA Field Engineering personnel from Clinch River Mile 9.0 and Poplar Creek Kilometer 1.6 on April 21, 23, and 26. Samples were split and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms to these samples resulted in no toxicity (survival, growth, or reproduction) to either species in testing conducted by TVA.

  18. Clinch River - Environmental Restoration Program (CR-ERP) study, ambient water toxicity

    Energy Technology Data Exchange (ETDEWEB)

    Russell, C.L.

    1997-06-01

    Clinch River - Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a study during the week of July 22-29, 1993, as described in the Statement of Work (SOW) document. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected by TVA Field Engineering personnel from Clinch River Mile 19.0 and Mile 22.0 on July 21, 23, and 26. Samples were split and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms to these samples resulted in no toxicity (survival, growth, or reproduction) to either species in testing conducted by TVA.

  19. Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program Baseline Safety Analysis File (BSAF)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Baseline Safety Analysis File (BSAF) is a facility safety reference document for the Idaho National Engineering Laboratory (INEL) environmental restoration activities. The BSAF contains information and guidance for safety analysis documentation required by the U.S. Department of Energy (DOE) for environmental restoration (ER) activities, including: Characterization of potentially contaminated sites. Remedial investigations to identify and remedial actions to clean up existing and potential releases from inactive waste sites Decontamination and dismantlement of surplus facilities. The information is INEL-specific and is in the format required by DOE-EM-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports. An author of safety analysis documentation need only write information concerning that activity and refer to BSAF for further information or copy applicable chapters and sections. The information and guidance provided are suitable for: {sm_bullet} Nuclear facilities (DOE Order 5480-23, Nuclear Safety Analysis Reports) with hazards that meet the Category 3 threshold (DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) {sm_bullet} Radiological facilities (DOE-EM-STD-5502-94, Hazard Baseline Documentation) Nonnuclear facilities (DOE-EM-STD-5502-94) that are classified as {open_quotes}low{close_quotes} hazard facilities (DOE Order 5481.1B, Safety Analysis and Review System). Additionally, the BSAF could be used as an information source for Health and Safety Plans and for Safety Analysis Reports (SARs) for nuclear facilities with hazards equal to or greater than the Category 2 thresholds, or for nonnuclear facilities with {open_quotes}moderate{close_quotes} or {open_quotes}high{close_quotes} hazard classifications.

  20. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  1. Applications of Remote Sensing and GIS to the Assessment of Riparian Zones for Environmental Restoration in Agricultural Watersheds

    Institute of Scientific and Technical Information of China (English)

    GU Fengxia; LIU Wenbao

    2010-01-01

    Geographical design of riparian buffers with long-term vegetation cover for environmental restoration in agricul turalwatersheds needs to assess how much farmland is located in the buffers of a concerned watershed. Traditionally, this assessment was done by field surveying and manual mapping, which was a time-consuming and costly process for a large region. In this paper,remote sensing (RS) and geographical information system (GIS) as cost-effective techniques were used to develop a catchments-based approach for identifying critical sites of agricultural riparian buffer restoration. The method was explained through a case study of watershed with 11 catchments and results showed that only four of the catchments were eligible in terms of higher priority for riparian buffer restoration. This research has methodological contributions to the spatial assessment of farming intensities in catchments-based riparian buffers across a watershed and to the geographical designs of variable buffering scenarios within catchments. The former makes the catchments-based management strategy possible, and the latter provides alternative restoration scenarios to meet different management purposes, both of which have direct implementations to the environmental restoration of riparian buffers in the real world. This study, thus, highlights the great potential of RS and GIS applications to the planning and management of riparian buffer restoration in agricultural watersheds.

  2. GIS environmental information analysis of the Darro River basin as the key for the management and hydrological forest restoration.

    Science.gov (United States)

    Fernandez, Paz; Delgado, Expectación; Lopez-Alonso, Mónica; Poyatos, José Manuel

    2017-09-23

    This article presents analyses of soil and environmental information for the Darro River basin (Granada-Spain) preliminary to its hydrological and forestry restoration. These analyses were carried out using a geographical information system (GIS) and employing a new procedure that adapts hydrological forest-restoration methods. The complete analysis encompasses morphological conditions, soil and climate characteristics as well as vegetation and land use. The study investigates soil erosion in the basin by using Universal Soil Loss Equation (USLE) and by mapping erosion fragility units. The results are presented in a set of maps and their analysis, providing the starting point for river basin management and the hydrological and forestry-restoration project that was approved at the end of 2015. The presence of soft substrates (e.g. gravel and sand) indicates that the area is susceptible to erosion, particularly the areas that are dominated by human activity and have little soil protection. Finally, land use and vegetation cover were identified as key factors in the soil erosion in the basin. According to the results, river authorities have included several measures in the restoration project aimed at reducing the erosion and helping to recover the environmental value of this river basin and to include it in recreation possibilities for the community of Granada. The presented analytical approach, designed by the authors, would be useful as a tool for environmental restoration in other small Mediterranean river basins. Copyright © 2017 Elsevier B.V. All rights reserved.

  3. Waste management/waste certification plan for the Oak Ridge National Laboratory Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.

    1995-03-01

    This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency`s (EPA`s) guidance. Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created.

  4. Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-04-29

    This report presents the findings of the Interagency Requirements Review of the Department of Energy (DOE) Environmental Restoration and Waste Management (ERWM) Program. The review was requested by Admiral Watkins to help determine the FY 1993 funding levels necessary to meet all legal requirements. The review was undertaken by analysts from the Office of Management and Budget (OMB) and Army Corps of Engineers, reporting to an Interagency Group (IAG) of senior Administration officials concerned with environmental cleanup issues. The purpose of the study was to determine the level of finding needed in FY 1993 for each ERWM Field Office to comply with all Federal, State, and local government legal requirements; all DOE Orders that establish standards for environment, safety and health (ES and H) management; and for prudent investments in other discretionary and management activities such as upgrading administrative buildings, information systems, etc. The study also reviewed the cost estimates supporting the ERWM proposed budget, including direct costs (labor, equipment) and indirect costs (administrative, landlord services, contractor overhead). The study did not analyze whether the Federal/State legal requirements and DOE Orders were necessary or whether the proposed clean-up remedies represent the most cost effective alternatives available.

  5. Idaho National Engineering Laboratory Environmental Restoration Program Schedule Contingency Evaluation Report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This report represents the schedule contingency evaluation done on the FY-93 Major System Acquisition (MSA) Baseline for the Idaho National Engineering Laboratory`s (INEL) Environmental Restoration Program (EPP). A Schedule Contingency Evaluation Team (SCET) was established to evaluate schedule contingency on the MSA Baseline for the INEL ERP associated with completing work within milestones established in the baseline. Baseline schedules had been established considering enforceable deadlines contained in the Federal Facilities Agreement/Consent Order (FFA/CO), the agreement signed in 1992, by the State of Idaho, Department of Health & Welfare, the U.S. Environmental Protection Agency, Region 10, and the U.S. Department of Energy, Idaho Operations Office. The evaluation was based upon the application of standard schedule risk management techniques to the specific problems of the INEL ERP. The schedule contingency evaluation was designed to provided early visibility for potential schedule delays impacting enforceable deadlines. The focus of the analysis was on the duration of time needed to accomplish all required activities to achieve completion of the milestones in the baseline corresponding to the enforceable deadlines. Additionally, the analysis was designed to identify control of high-probability, high-impact schedule risk factors.

  6. Environmental Impact Assessment of reservoir construction: new perspectives for restoration economy, and development: the Belo Monte Power Plant case study

    Directory of Open Access Journals (Sweden)

    JG. Tundisi

    Full Text Available Abstract The Environmental Impact Assessment of reservoir construction can be viewed as a new strategic perspective for the economic development of a region. Based on the principles of a watershed approach a interdisciplinary and multidisciplinary systemic view including biogeophysiographical, economic and socio environmental studies the new vision of a EIA provides a basic substratum for the restoration economy and an advanced model for the true development much well ahead of the modernization aspects of the project of a reservoir construction.

  7. Environmental Impact Assessment of reservoir construction: new perspectives for restoration economy, and development: the Belo Monte Power Plant case study.

    Science.gov (United States)

    Tundisi, J G; Matsumura-Tundisi, T; Tundisi, J E M

    2015-08-01

    The Environmental Impact Assessment of reservoir construction can be viewed as a new strategic perspective for the economic development of a region. Based on the principles of a watershed approach a interdisciplinary and multidisciplinary systemic view including biogeophysiographical, economic and socio environmental studies the new vision of a EIA provides a basic substratum for the restoration economy and an advanced model for the true development much well ahead of the modernization aspects of the project of a reservoir construction.

  8. STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITYNEVADA TEST SITE, NEVADA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada.

  9. Vugraph presentations of the fourth DOE Industry/University/Lab Forum on Robotics for Environmental Restoration and Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This document is a compilation of various presentations from the Fourth DOE Industry/University/Lab Forum on Robotics for Environmental Restoration and Waste Management held in Albuquerque, New Mexico July 19--21, 1993. Separate abstracts were prepared for each presentation of this report.

  10. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    Science.gov (United States)

    2012-04-20

    ... restore 955 acres of tidal marsh; preserve and enhance a 106-acre area of non-tidal seasonal wetland while... Fish and Wildlife Service Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA... Wetland and Watershed Restoration Project is now available. The final EIR/EIS, which we prepared and...

  11. A case study of elementary teachers' conceptions of environmental literacy in relationship to a tall grass prairie restoration project

    Science.gov (United States)

    Shume, Teresa Jayne

    The purpose of this qualitative case study was to describe seven elementary teachers' conceptions of environmental literacy in relationship to a tall grass prairie restoration project and to explore ways in which the tall grass prairie restoration project for third grade contributed to enhancing educational learning experiences. The research questions were: 1. What are teachers' conceptions of environmental literacy for third grade students? 2. How does the prairie restoration trip contribute to teachers' capacity to teach for environmental literacy of third grade students? 3. What is the pedagogical value of the prairie restoration project? The theoretical frameworks underpinning this study were David Sobel's (1996) model for developmental progression in children's relationships with nature, and the North American Environmental Education Association's (2011) framework for environmental literacy. The first assertion derived from thematic data analysis of interviews, field trip observations, classroom observations, and artifacts was, The participating teachers' visions of environmental literacy for third grade students included components that spanned across a developmentally appropriate progression from cultivating empathy for living things, to fueling discovery of nature, to fostering a sense of responsibility toward the natural world . Components of environmental literacy described by teachers included being at ease in the natural environment, appreciation and respect, wonder and curiosity, awareness and interdependence, sense of agency, responsibility and service, and environmental knowledge. The second assertion stemming from thematic data analysis was, The prairie restoration project and related curriculum have pedagogical value that included and exceeded addressing state science standards. In addition to addressing state science standards identified by teachers, the curriculum related to the prairie restoration project served as an agent of curricular

  12. Site descriptions of environmental restoration units at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Kuhaida, A.J. Jr.; Parker, A.F.

    1997-02-01

    This report provides summary information on Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) sites as listed in the Oak Ridge Reservation Federal Facility Agreement (FFA), dated January 1, 1992, Appendix C. The Oak Ridge National Laboratory was built in 1943 as part of the World War II Manhattan Project. The original mission of ORNL was to produce and chemically separate the first gram-quantities of plutonium as part of the national effort to produce the atomic bomb. The current mission of ORNL is to provide applied research and development in support of the U.S. Department of Energy (DOE) programs in nuclear fusion and fission, energy conservation, fossil fuels, and other energy technologies and to perform basic scientific research in selected areas of the physical, life, and environmental sciences. ER is also tasked with clean up or mitigation of environmental impacts resulting from past waste management practices on portions of the approximately 37,000 acres within the Oak Ridge Reservation (ORR). Other installations located within the ORR are the Gaseous Diffusion Plant (K-25) and the Y-12 plant. The remedial action strategy currently integrates state and federal regulations for efficient compliance and approaches for both investigations and remediation efforts on a Waste Area Grouping (WAG) basis. As defined in the ORR FFA Quarterly Report July - September 1995, a WAG is a grouping of potentially contaminated sites based on drainage area and similar waste characteristics. These contaminated sites are further divided into four categories based on existing information concerning whether the data are generated for scoping or remedial investigation (RI) purposes. These areas are as follows: (1) Operable Units (OU); (2) Characterization Areas (CA); (3) Remedial Site Evaluation (RSE) Areas; and (4) Removal Site Evaluation (RmSE) Areas.

  13. Environmental qualification design for NPP refurbishment to comply with revised licensing requirements

    Energy Technology Data Exchange (ETDEWEB)

    MacBeth, M. J.; Hemmings, R. L. [Canatom-NPM, Ontario (Canada)

    2002-04-15

    Recent Canadian Nuclear Regulatory decisions have imposed Environmental Qualification (EQ) requirements for twenty-four Reactor Building (RB) airlocks at the four-unit Pickering Nuclear Generating Station-B (PNGS-B) facility. This paper describes the EQ modification design work completed by CANATOM-NPM for the problematic aspects for such projects. The airlocks allow RB access while providing a containment boundary and are designed to prevent a potential breach of containment for all analysed station conditions. Each PNGS-B unit has three large equipment airlocks and three smaller personnel airlocks. The airlocks must function under postulated worst-case design basis accident(DBA) conditions for assigned mission durations. The design must ensure that accident conditions cannot spuriously initiate an un-requested door opening. CANATOM-NPM reviewed site data to specify the necessary EQ modifications required to satisfy licensing requirements while providing a correct and complete as-found record of the existing airlock installation. The design team assessed the installed airlocks configuration against environmental qualification requirements to finalize the list of necessary modifications. A comprehensive, cross-discipline review of proposed design changes was completed to identify any further changes required to satisfy the final EQ licensing goal. The design team also conducted a design review of the EQ modification installation strategy to integrate the design deliverables with the installation team requirements while attempting to minimize necessary outage time for EQ modification installations. This project was completed on schedule and within the cost limitations required by the client with comprehensive, high quality final design packages. Overall improvements were realized for OPG system drawings and the electronic documentation of design data. The EQ modifications designed by CANATOM-NPM will ensure the continued operation of the PNGS-B NPP past December 31

  14. Lacandon Maya ecosystem management: sustainable design for subsistence and environmental restoration.

    Science.gov (United States)

    Diemont, Stewart A W; Martin, Jay F

    2009-01-01

    Indigenous groups have designed and managed their ecosystems for generations, resulting in biodiversity protection while producing for their family's needs. Here we describe the agroecosystem of the Lacandon Maya, an indigenous group who live in Chiapas, Mexico. The Lacandon practice a form of swidden agriculture that conserves the surrounding rain forest ecosystem while cycling the majority of their land through five successional stages. These stages include an herbaceous stage, two shrub stages, and two forest stages. A portion of their land is kept in primary forest. This study presents the Lacandon traditional ecological knowledge (TEK) for agroforestry and quantitatively describes the plant community and the associated soil ecology of each successional stage. Also documented is the knowledge of the Lacandon regarding the immediate use of plant species and plant species useful for soil fertility enhancement. Woody plant diversity increases during the successional stages of the Lacandon system, and by the beginning of the first forest stage, the diversity is similar to that of the primary forest. In all stages, Lacandon use 60% of the available plant species for food, medicine, and raw materials. Approximately 45% of the woody plant species present in each fallow stage were thought by the Lacandon to enhance soil fertility. Total soil nitrogen and soil organic matter increased with successional stage and with time from intentional burn. Nutrient and soil nematode dynamics in shrub stages related to the presence of introduced and managed plants, indicating engineered soil enhancement by the Lacandon. The effects on biodiversity and soil ecology coupled with productivity for agricultural subsistence indicate that Lacandon TEK may offer tools for environmental conservation that would provide for a family's basic needs while maintaining a biodiverse rain forest ecosystem. Tools such as these may offer options for regional restoration and conservation efforts such as

  15. Proceedings of the US Department of Energy Office of Environmental Restoration and Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    1990-09-01

    The fifth of a series of waste minimization (WMIN)/reduction workshops (Waste Reduction Workshop V) was held at the Little Tree Inn in Idaho Falls, Idaho, on July 24--26, 1990. The workshops are held under the auspices of the US Department of Energy's (DOE's) Office of Environmental Restoration and Waste Management (EM). The purpose of this workshop was to provide a forum for sharing site activities in WMIN/reduction planning. Topics covered were management commitment, organizational structure, goal setting, reporting requirements, data bases and tracking systems, pollution prevention, awareness and incentives, information exchange, process waste assessment (PWA) implementation, and recycling internal and external. The workshops assist DOE waste-generating sites in implementing WMIN/reduction programs, plans, and activities, thus providing for optimal waste reduction within the DOE complex. All wastes are considered within this discipline: liquid, solid, and airborne, within the categories of high-level waste (HLW), transuranic waste (TRU), low-level waste (LLW), hazardous waste, and mixed waste.

  16. A large-scale environmental flow experiment for riparian restoration in the Colorado River delta

    Science.gov (United States)

    Shafroth, Patrick B.; Schlatter, Karen; Gomez-Sapiens, Martha; Lundgren, Erick; Grabau, Matthew R.; Ramirez-Hernandez, Jorge; Rodriguez-Burgeueno, J. Eliana; Flessa, Karl W.

    2017-01-01

    Managing streamflow is a widely-advocated approach to provide conditions necessary for seed germination and seedling establishment of trees in the willow family (Salicaceae). Experimental flow releases to the Colorado River delta in 2014 had a primary objective of promoting seedling establishment of Fremont cottonwood (Populus fremontii) and Goodding's willow (Salix gooddingii). We assessed seed germination and seedling establishment of these taxa as well as the non-native tamarisk (Tamarix spp.) and native seepwillow shrubs (Baccharis spp.) in the context of seedling requirements and active land management (land grading, vegetation removal) at 23 study sites along 87 river km. In the absence of associated active land management, experimental flows to the Colorado River delta were minimally successful at promoting establishment of new woody riparian seedlings, except for non-native Tamarix. Our results suggest that the primary factors contributing to low seedling establishment varied across space, but included low or no seed availability in some locations for some taxa, insufficient soil moisture availability during the growing season indicated by deep groundwater tables, and competition from adjacent vegetation (and, conversely, availability of bare ground). Active land management to create bare ground and favorable land grades contributed to significantly higher rates of Salicaceae seedling establishment in a river reach with high groundwater tables. Our results provide insights that can inform future environmental flow deliveries to the Colorado River delta and its ecosystems and other similar efforts to restore Salicaceae taxa around the world.

  17. Clinch River - Environmental Restoration Program (CR-ERP) study, Ambient water toxicity

    Energy Technology Data Exchange (ETDEWEB)

    Simbeck, D.J.

    1997-06-01

    Clinch River - Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a study during the week of January 25-February 1, 1994, as described in the Statement of Work (SOW) document. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected by TVA Field Engineering personnel from Clinch River Mile 9.0, Poplar Creek Mile 1.0, and Poplar Creek Mile 2.9 on January 24, 26, and 28. Samples were partitioned (split) and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms to these samples resulted in no toxicity (survival or growth) to fathead minnows; however, toxicity to daphnids (significantly reduced reproduction) was demonstrated in undiluted samples from Poplar Creek Mile 1.0 in testing conducted by TVA based on hypothesis testing of data. Point estimation (IC{sub 25}) analysis of the data, however, showed no toxicity in PCM 1.0 samples.

  18. Clinch River - Environmental Restoration Program (CR-ERP) study, ambient water toxicity

    Energy Technology Data Exchange (ETDEWEB)

    Simbeck, D.J.

    1997-06-01

    Clinch River - Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a study during the week of April 14-21, 1994, as described in the Statement of Work (SOW) document. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected by TVA Field Engineering personnel from Poplar Creek Mile 4.3, Poplar Creek Mile 5.1, and Poplar Creek Mile 6.0 on April 13, 15, and 18. Samples were partitioned (split) and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms to these samples resulted in no toxicity (survival or growth) to daphnids in undiluted samples; however, toxicity to fathead minnows (significantly reduced survival) was demonstrated in undiluted samples from Poplar Creek Miles 4.3 and 6.0 in testing conducted by TVA based on hypothesis testing of data. Daphnid reproduction was significantly less than controls in 50 percent dilutions of samples from Poplar Creek Miles 4.3 and 6.0, while no toxicity to fathead minnows was shown in diluted (50 percent) samples.

  19. Development and use of innovative approaches to waste management and environmental restoration: Potential liability and its implications

    Energy Technology Data Exchange (ETDEWEB)

    Owens, W.L.

    1990-12-01

    The US Department of Energy (DOE) has established as its goal to have all of its facilities cleaned up and in compliance with all applicable environmental laws by the year 2019. As part of its plan to achieve that goal, DOE created, in November 1989, an Office of Environmental Restoration and Waste Management (EM) and, within EM, an Office of Technology Development (OTD). Since the achievement of DOE's long-term objective in the area of waste management and environmental restoration is not possible utilizing only existing technology, the importance of OTD's mission is clear. A question has been raised regarding the nature of the potential liability associated with development, testing, and use of new technologies for waste management and environmental restoration; and the impact it may have on the ability or willingness of other parties to participate in DOE's technology development program. This report is intended to provide at least a preliminary answer to the question. Given the range of activities involved in the technology development process, there are many circumstances that could result in liability. Therefore, the discussion here is somewhat general. It may, however, provide a base for more detailed analysis, at a later time, of liability issues raised by specific circumstances.

  20. Development and use of innovative approaches to waste management and environmental restoration: Potential liability and its implications

    Energy Technology Data Exchange (ETDEWEB)

    Owens, W.L.

    1990-12-01

    The US Department of Energy (DOE) has established as its goal to have all of its facilities cleaned up and in compliance with all applicable environmental laws by the year 2019. As part of its plan to achieve that goal, DOE created, in November 1989, an Office of Environmental Restoration and Waste Management (EM) and, within EM, an Office of Technology Development (OTD). Since the achievement of DOE`s long-term objective in the area of waste management and environmental restoration is not possible utilizing only existing technology, the importance of OTD`s mission is clear. A question has been raised regarding the nature of the potential liability associated with development, testing, and use of new technologies for waste management and environmental restoration; and the impact it may have on the ability or willingness of other parties to participate in DOE`s technology development program. This report is intended to provide at least a preliminary answer to the question. Given the range of activities involved in the technology development process, there are many circumstances that could result in liability. Therefore, the discussion here is somewhat general. It may, however, provide a base for more detailed analysis, at a later time, of liability issues raised by specific circumstances.

  1. A systematic review of ecological attributes that confer resilience to climate change in environmental restoration.

    Science.gov (United States)

    Timpane-Padgham, Britta L; Beechie, Tim; Klinger, Terrie

    2017-01-01

    Ecological restoration is widely practiced as a means of rehabilitating ecosystems and habitats that have been degraded or impaired through human use or other causes. Restoration practices now are confronted by climate change, which has the potential to influence long-term restoration outcomes. Concepts and attributes from the resilience literature can help improve restoration and monitoring efforts under changing climate conditions. We systematically examined the published literature on ecological resilience to identify biological, chemical, and physical attributes that confer resilience to climate change. We identified 45 attributes explicitly related to climate change and classified them as individual- (9), population- (6), community- (7), ecosystem- (7), or process-level attributes (16). Individual studies defined resilience as resistance to change or recovery from disturbance, and only a few studies explicitly included both concepts in their definition of resilience. We found that individual and population attributes generally are suited to species- or habitat-specific restoration actions and applicable at the population scale. Community attributes are better suited to habitat-specific restoration at the site scale, or system-wide restoration at the ecosystem scale. Ecosystem and process attributes vary considerably in their type and applicability. We summarize these relationships in a decision support table and provide three example applications to illustrate how these classifications can be used to prioritize climate change resilience attributes for specific restoration actions. We suggest that (1) including resilience as an explicit planning objective could increase the success of restoration projects, (2) considering the ecological context and focal scale of a restoration action is essential in choosing appropriate resilience attributes, and (3) certain ecological attributes, such as diversity and connectivity, are more commonly considered to confer

  2. Environmental conservation and restoration ecology: two facets of the same problem

    Directory of Open Access Journals (Sweden)

    K. M. Urbanska

    2000-03-01

    Full Text Available Restoration ecology has often been regarded as a subordinate component of conservation biology and yet the two disciplines differ from each other. Conservation aims at staving off extinction, i.e. preserving ecological structures and services which still exist, however endangered they may be. On the other hand, the principal objective of restoration is re-building ecological structures and services that have been destroyed. The most distinct focus of conservation is on population response to exploitation, whereas restoration is principally concerned with over-exploited sites and landscapes in which communities/ecosystems are to be re-built. Conservation aims at preserving as many species as possible; on the other hand, the biodiversity approach in restoration may be addressed on three levels viz. 1 initial species diversity, 2 post-restoration increase of diversity via spontaneous species immigration, and 3 age-state diversity of developing plant cover.

    The conceptual framework in conservation biology differs from that in restoration ecology. The two basic paradigms used in conservation biology are 1 small-population paradigm and 2 declining-population paradigm, and one of its useful concepts is population viability assessment (PVA. The two principal paradigms used in restoration ecology are 1 nature-in-balance paradigm and 2 nature-in-flux paradigm. Interfaces between conservation and restoration may be recognized when e.g., recovery strategies for threatened species include habitat/ecosystem restoration, or when population processes in non-threatened species are studied to verify their usefulness as restoration material.

    Integration of species and ecosystem approaches is already recognizable in ecology. It is to be hoped that in future conservation and restoration become integrated components of ecosystem management, but for the time being they remain two different facets of the same problem which is the negative human impact

  3. Development and testing of a sustainable environmental restoration policy on eradicating the poverty trap in China's Changting County.

    Science.gov (United States)

    Cao, Shixiong; Zhong, Binglin; Yue, Hui; Zeng, Heshui; Zeng, Jinhua

    2009-06-30

    It is widely accepted that environmental degradation and poverty are linked and that conservation and poverty reduction should be tackled together. However, success with integrated strategies has been elusive. Here, we present the results of a study that illustrates how development that combines environmental and economic perspectives and that provides appropriate compensation to affected populations can improve both nature and society, thereby eradicating the "poverty trap." The results show that if we cannot improve the livelihood of local residents, we will be unable to restore degraded environments when state-owned property is transferred to private ownership to encourage better management by residents. In contrast, measures to eliminate poverty, combined with the development of green enterprises that improve the livelihoods of private land owners in the long term, is the precondition for successful ecological restoration.

  4. Integrated Safety Management System Phase 1 and 2 Verification for the Environmental Restoration Contractor Volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    CARTER, R.P.

    2000-04-04

    DOE Policy 450.4 mandates that safety be integrated into all aspects of the management and operations of its facilities. The goal of an institutionalized Integrated Safety Management System (ISMS) is to have a single integrated system that includes Environment, Safety, and Health requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and the federal property over the life cycle of the Environmental Restoration (ER) Project. The purpose of this Environmental Restoration Contractor (ERC) ISMS Phase MI Verification was to determine whether ISMS programs and processes were institutionalized within the ER Project, whether these programs and processes were implemented, and whether the system had promoted the development of a safety conscious work culture.

  5. Electronic document management system analysis report and system plan for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Frappaolo, C. [Delphi Consulting Group, Boston, MA (United States)

    1995-09-01

    Lockheed Martin Energy Systems, Inc. (LMES) has established and maintains Document Management Centers (DMCs) to support Environmental Restoration Program (ER) activities undertaken at three Oak Ridge facilities: Oak Ridge National Laboratory, Oak Ridge K-25 Site, Oak Ridge Y-12 Plant; and two sister sites: Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio, and Paducah Gaseous Diffusion Plant in Paducah, Kentucky. The role of the DMCs is to receive, store, retrieve, and properly dispose of records. In an effort to make the DMCs run more efficiently and to more proactively manage the records` life cycles from cradle to grave, ER has decided to investigate ways in which Electronic Document Management System (EDMS) technologies can be used to redefine the DMCs and their related processes. Specific goals of this study are tightening control over the ER documents, establishing and enforcing record creation and retention procedures, speeding up access to information, and increasing the accessibility of information. A working pilot of the solution is desired within the next six months. Based on a series of interviews conducted with personnel from each of the DMCs, key management, and individuals representing related projects, it is recommended that ER utilize document management, full-text retrieval, and workflow technologies to improve and automate records management for the ER program. A phased approach to solution implementation is suggested starting with the deployment of an automated storage and retrieval system at Portsmouth. This should be followed with a roll out of the system to the other DMCs, the deployment of a workflow-enabled authoring system at Portsmouth, and a subsequent roll out of this authoring system to the other sites.

  6. Corrective action management unit application for the Environmental Restoration Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Evans, G.C.

    1994-06-01

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

  7. Annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory for FY 1992

    Energy Technology Data Exchange (ETDEWEB)

    Clapp, R.B. (ed.)

    1992-09-01

    This report summarizes the salient features of the annual efforts of the investigations and monitoring, conducted to support the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL). The results presented can be used to develop a conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. Groundwater, soils, sediments, and surface water monitoring results are described.

  8. Environmental Restoration Program pollution prevention performance measures for FY 1993 and 1994 remedial investigations: Generator training manual

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This computer-based program is designed to help waste generators in the Environmental Restoration (ER) Program prevent pollution at the DOE Oak Ridge Field Office (DOE-OR) facilities in Oak Ridge, Paducah, and Portsmouth. The Numerical Scoring System (NSS) is an interactive system designed to maintain data on ER Program pollution prevention efforts and to measure the success of these efforts through the ER Program life cycle.

  9. Technical Approach and Plan for Transitioning Spent Nuclear Fuel (SNF) Project Facilities to the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    SKELLY, W.A.

    1999-10-06

    This document describes the approach and process in which the 100-K Area Facilities are to be deactivated and transitioned over to the Environmental Restoration Program after spent nuclear fuel has been removed from the K Basins. It describes the Transition Project's scope and objectives, work breakdown structure, activity planning, estimated cost, and schedule. This report will be utilized as a planning document for project management and control and to communicate details of project content and integration.

  10. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments.

  11. Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1993 (first quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  12. Summary of activities of the life cycle costing workshop conducted by the Environmental Restoration Program of Oak Ridge National Laboratory. Enviromental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-01

    A five-day life cycle workshop was conducted by the Environmental Restoration (FR) Program of Oak Ridge National Laboratory (ORNL) to develop appropriate remediation scenarios for each Waste Area Grouping (WAG) at ORNL and to identify associated data needs (e.g., remedial investigations, special studies, and technology demonstrations) and required interfaces. Workshop participants represented the Department of Energy, Martin Marietta Energy Systems, Inc., Bechtel National, Radian Corporation, EBASCO Corporation, and M-K Ferguson. The workshop was used to establish a technical basis for remediation activities at each WAG. The workshop results are documented in this report and provide the baseline for estimating the technical scope for each WAG. The scope and associated budgets and schedules will be summarized in baseline reports for each WAG, which, in turn, will be compiled into an overall strategy document for ORNL ER.

  13. 78 FR 16479 - Revised Notice of Intent To Prepare a joint Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2013-03-15

    .... SUMMARY: This notice is a revision of the Notice of Intent published August 26, 2011 (76 FR 53423... Sacramento City Hall Galleria Room, 1110 W. Capitol Ave., West Sacramento, CA 95691. The presentation will... the U.S., vegetation and wildlife resources, special-status species, aesthetics, cultural...

  14. Forecasting the effects of coastal protection and restoration projects on wetland morphology in coastal Louisiana under multiple environmental uncertainty scenarios

    Science.gov (United States)

    Couvillion, Brady R.; Steyer, Gregory D.; Wang, Hongqing; Beck, Holly J.; Rybczyk, John M.

    2013-01-01

    Few landscape scale models have assessed the effects of coastal protection and restoration projects on wetland morphology while taking into account important uncertainties in environmental factors such as sea-level rise (SLR) and subsidence. In support of Louisiana's 2012 Coastal Master Plan, we developed a spatially explicit wetland morphology model and coupled it with other predictive models. The model is capable of predicting effects of protection and restoration projects on wetland area, landscape configuration, surface elevation, and soil organic carbon (SOC) storage under multiple environmental uncertainty scenarios. These uncertainty scenarios included variability in parameters such as eustatic SLR (ESLR), subsidence rate, and Mississippi River discharge. Models were run for a 2010–2060 simulation period. Model results suggest that under a “future-without-action” condition (FWOA), coastal Louisiana is at risk of losing between 2118 and 4677 km2 of land over the next 50 years, but with protection and restoration projects proposed in the Master Plan, between 40% and 75% of that loss could be mitigated. Moreover, model results indicate that under a FWOA condition, SOC storage (to a depth of 1 m) could decrease by between 108 and 250 million metric tons, a loss of 12% to 30% of the total coastwide SOC, but with the Master Plan implemented, between 35% and 74% of the SOC loss could be offset. Long-term maintenance of project effects was best attained in areas of low SLR and subsidence, with a sediment source to support marsh accretion. Our findings suggest that despite the efficacy of restoration projects in mitigating losses in certain areas, net loss of wetlands in coastal Louisiana is likely to continue. Model results suggest certain areas may eventually be lost regardless of proposed restoration investment, and, as such, other techniques and strategies of adaptation may have to be utilized in these areas.

  15. Final Restoration Plan for Rose Atoll National Wildlife Refuge, including Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Restoration Plan for Rose Atoll NWR consists of removing the metal debris remaining from the grounding of a Taiwanese fishing vessel in 1993, and monitoring the...

  16. 78 FR 60309 - Draft Environmental Impact Statement for the Restoration of Native Species in High Elevation...

    Science.gov (United States)

    2013-10-01

    ... ecological function; (2) to prevent the extinction of two species of mountain yellow-legged frogs (Rana muscosa and Rana sierrae; MYLF) and to restore MYLF populations to many locations in the parks where...

  17. 75 FR 21651 - Final Environmental Impact Statement; Prisoners Harbor Coastal Wetland Restoration Plan, Channel...

    Science.gov (United States)

    2010-04-26

    ... germination and growth after work is completed. Riparian restoration in Canada del Puerto would take place in a two-pronged, step-wise approach. In an area of approximately 20 acres eucalyptus trees would...

  18. 78 FR 20298 - Restoration and Compensation Determination Plan and Environmental Assessment: Aluminum Production...

    Science.gov (United States)

    2013-04-04

    ... Division, 290 Broadway, 20th Floor, New York, NY 10007. Electronic comments may be sent directly to: lisa... identified in the RCDP consisting of ecological restoration projects, human use projects that enhance...

  19. Trends in a satellite-derived vegetation index and environmental variables in a restored brackish lagoon

    Directory of Open Access Journals (Sweden)

    Ji Yoon Kim

    2015-07-01

    Full Text Available We evaluated relative influence of climatic variables on the plant productivity after lagoon restoration. Chilika Lagoon, the largest brackish lake ecosystem in East Asia, experienced severe problems such as excessive dominance of freshwater exotic plants and rapid debasement of biodiversity associated with decreased hydrologic connectivity between the lagoon and the ocean. To halt the degradation of the lagoon ecosystem, the Chilika Development Authority implemented a restoration project, creating a new channel to penetrate the barrier beach of the lagoon. Using a satellite-derived normalized difference vegetation index (NDVI dataset, we compared the trend of vegetation changes after the lagoon restoration, from April 1998 to May 2014. The time series of NDVI data were decomposed into trend, seasonal, and random components using a local regression method. The results were visualized to understand the traits of spatial distribution in the lagoon. The NDVI trend, indicative of primary productivity, decreased rapidly during the restoration period, and gradually increased (slope coefficient: 2.1×10−4, p<0.05 after two years of restoration. Level of seawater exchange had more influences on plant productivity than local precipitation in the restored lagoon. Higher El Niño/Southern Oscillation increased sea level pressure, and caused intrusion of seawater into the lagoon, and the subsequently elevated salinity decreased the annual mean NDVI. Our findings suggest that lagoon restoration plans for enhancing interconnectivity with the ocean should consider oceanographic effects due to meteorological forcing, and long-term NDVI results can be used as a valuable index for adaptive management of the restoration site.

  20. Emergency Doses (ED) - Revision 3: A calculator code for environmental dose computations

    Energy Technology Data Exchange (ETDEWEB)

    Rittmann, P.D.

    1990-12-01

    The calculator program ED (Emergency Doses) was developed from several HP-41CV calculator programs documented in the report Seven Health Physics Calculator Programs for the HP-41CV, RHO-HS-ST-5P (Rittman 1984). The program was developed to enable estimates of offsite impacts more rapidly and reliably than was possible with the software available for emergency response at that time. The ED - Revision 3, documented in this report, revises the inhalation dose model to match that of ICRP 30, and adds the simple estimates for air concentration downwind from a chemical release. In addition, the method for calculating the Pasquill dispersion parameters was revised to match the GENII code within the limitations of a hand-held calculator (e.g., plume rise and building wake effects are not included). The summary report generator for printed output, which had been present in the code from the original version, was eliminated in Revision 3 to make room for the dispersion model, the chemical release portion, and the methods of looping back to an input menu until there is no further no change. This program runs on the Hewlett-Packard programmable calculators known as the HP-41CV and the HP-41CX. The documentation for ED - Revision 3 includes a guide for users, sample problems, detailed verification tests and results, model descriptions, code description (with program listing), and independent peer review. This software is intended to be used by individuals with some training in the use of air transport models. There are some user inputs that require intelligent application of the model to the actual conditions of the accident. The results calculated using ED - Revision 3 are only correct to the extent allowed by the mathematical models. 9 refs., 36 tabs.

  1. Soil bio-engineering for risk mitigation and environmental restoration in a humid tropical area

    Directory of Open Access Journals (Sweden)

    A. Petrone

    2009-07-01

    Full Text Available The use of soil bio-engineering techniques in developing countries is a relevant issue for disaster mitigation, environmental restoration and poverty reduction. Research on authochtonal plants suitable for this kind of works and on economic efficiency is essential for the divulgation of such techniques. The present paper is focused on this two issues related to the realization of various typologies of soil bio-engineering works in the humid tropic of Nicaragua.



    In the area of Río Blanco, located in the Department of Matagalpa, soil bio-engineering installations were built in several sites. The particular structures built were: drainages with live fascine mattress, a live palisade, a vegetated live crib wall for riverbank protection, a vegetative covering made of a metallic net and biotextile coupled with a live palisade made of bamboo. In order to evaluate the suitability of the various plants used in the works, monitorings were performed, one in the live palisade alongside an unpaved road and the other on the live crib wall along a riverbank, collecting survival rate and morphological parameters data. Concerning the economic efficiency we proceed to a financial analysis of the works and once the unit price was obtained, we converted the amount in EPP Dollars (Equal Purchasing Power in order to compare the Nicaraguan context with the Italian one.



    Among the used species we found that Madero negro (Gliricidia sepium and Roble macuelizo (Tabebuia rosea are adequate for soil-bioengineering measure on slopes while Helequeme (Erythrina fusca reported a successful behaviour only in the crib wall for riverbank protection.



    In the comparison of the costs in Nicaragua and in Italy, the unit price reduction for the Central American country ranges between 1.5 times (for the vegetative covering and almost 4 times (for the fascine mattress if it's used the EPP dollar exchange

  2. Soil bioengineering for risk mitigation and environmental restoration in a humid tropical area

    Directory of Open Access Journals (Sweden)

    A. Petrone

    2010-02-01

    Full Text Available The use of soil bio-engineering techniques in developing countries is a relevant issue for disaster mitigation, environmental restoration and poverty reduction. Research on the autochthonal plants suitable for these kinds of interventions and on the economic efficiency of the interventions is essential for the dissemination of such techniques. The present paper is focused on these two issues as related to the realization of various typologies of soil bioengineering works in the humid tropics of Nicaragua.

    In the area of Río Blanco, located in the Department of Matagalpa, soil bioengineering installations were built in several sites. The particular structures built were: drainages with live fascine mattress, a live palisade, a vegetated live crib wall for riverbank protection, a vegetative covering made of a metallic net and biotextile coupled with a live palisade made of bamboo. In order to evaluate the suitability of the various plants used in these works, monitoring was performed, one on the live palisade alongside an unpaved road and the other on the live crib wall along a riverbank, by collecting data on survival rate and morphological parameters. Concerning economic efficiency, we proceeded to a financial analysis of the works. Once the unit price was obtained, we converted the amount into EPP Dollars (Equal Purchasing Power in order to compare the Nicaraguan context with the European one.

    Among the species used we found that Gliricidia sepium (local common name: Madero negro and Tabebuia rosea (local common name: Roble macuelizo are adequate for soil bioengineering measures on slopes, while Erythrina fusca (local common name: Helequeme resulted in successful behaviour only in the crib wall for riverbank protection.

    In comparing costs in Nicaragua and in Italy, the unit price reduction for Nicaragua ranges from 1.5 times (for the vegetative covering to almost 4 times (for the fascine mattress

  3. Soil bio-engineering for risk mitigation and environmental restoration in a humid tropical area

    Science.gov (United States)

    Petrone, A.; Preti, F.

    2009-07-01

    The use of soil bio-engineering techniques in developing countries is a relevant issue for disaster mitigation, environmental restoration and poverty reduction. Research on authochtonal plants suitable for this kind of works and on economic efficiency is essential for the divulgation of such techniques. The present paper is focused on this two issues related to the realization of various typologies of soil bio-engineering works in the humid tropic of Nicaragua. In the area of Río Blanco, located in the Department of Matagalpa, soil bio-engineering installations were built in several sites. The particular structures built were: drainages with live fascine mattress, a live palisade, a vegetated live crib wall for riverbank protection, a vegetative covering made of a metallic net and biotextile coupled with a live palisade made of bamboo. In order to evaluate the suitability of the various plants used in the works, monitorings were performed, one in the live palisade alongside an unpaved road and the other on the live crib wall along a riverbank, collecting survival rate and morphological parameters data. Concerning the economic efficiency we proceed to a financial analysis of the works and once the unit price was obtained, we converted the amount in EPP Dollars (Equal Purchasing Power) in order to compare the Nicaraguan context with the Italian one. Among the used species we found that Madero negro (Gliricidia sepium) and Roble macuelizo (Tabebuia rosea) are adequate for soil-bioengineering measure on slopes while Helequeme (Erythrina fusca) reported a successful behaviour only in the crib wall for riverbank protection. In the comparison of the costs in Nicaragua and in Italy, the unit price reduction for the Central American country ranges between 1.5 times (for the vegetative covering) and almost 4 times (for the fascine mattress) if it's used the EPP dollar exchange rate. Conclusions are reached with regard to hydrological-risk mitigating actions performed on a

  4. Soil bioengineering for risk mitigation and environmental restoration in a humid tropical area

    Science.gov (United States)

    Petrone, A.; Preti, F.

    2010-02-01

    The use of soil bio-engineering techniques in developing countries is a relevant issue for disaster mitigation, environmental restoration and poverty reduction. Research on the autochthonal plants suitable for these kinds of interventions and on the economic efficiency of the interventions is essential for the dissemination of such techniques. The present paper is focused on these two issues as related to the realization of various typologies of soil bioengineering works in the humid tropics of Nicaragua. In the area of Río Blanco, located in the Department of Matagalpa, soil bioengineering installations were built in several sites. The particular structures built were: drainages with live fascine mattress, a live palisade, a vegetated live crib wall for riverbank protection, a vegetative covering made of a metallic net and biotextile coupled with a live palisade made of bamboo. In order to evaluate the suitability of the various plants used in these works, monitoring was performed, one on the live palisade alongside an unpaved road and the other on the live crib wall along a riverbank, by collecting data on survival rate and morphological parameters. Concerning economic efficiency, we proceeded to a financial analysis of the works. Once the unit price was obtained, we converted the amount into EPP Dollars (Equal Purchasing Power) in order to compare the Nicaraguan context with the European one. Among the species used we found that Gliricidia sepium (local common name: Madero negro) and Tabebuia rosea (local common name: Roble macuelizo) are adequate for soil bioengineering measures on slopes, while Erythrina fusca (local common name: Helequeme) resulted in successful behaviour only in the crib wall for riverbank protection. In comparing costs in Nicaragua and in Italy, the unit price reduction for Nicaragua ranges from 1.5 times (for the vegetative covering) to almost 4 times (for the fascine mattress), using the EPP dollar exchange rate. Our conclusions with

  5. A Synthesis of Environmental and Plant Community Data for Tidal Wetland Restoration Planning in the Lower Columbia River and Estuary

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Borde, Amy B.; Cullinan, Valerie I.

    2013-12-01

    This report reanalyzes and synthesizes previously existing environmental and plant community data collected by PNNL at 55 tidal wetlands and 3 newly restored sites in the lower Columbia River and estuary (LCRE) between 2005 and 2011. Whereas data were originally collected for various research or monitoring objectives of five studies, the intent of this report is to provide only information that will have direct utility in planning tidal wetland restoration projects. Therefore, for this report, all tidal wetland data on plants and the physical environment, which were originally developed and reported by separate studies, were tabulated and reanalyzed as a whole. The geographic scope of the data collected in this report is from Bonneville Lock and Dam to the mouth of the Columbia River

  6. Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 2: January--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

  7. Approach and Strategy for Performing Ecological Risk Assessments for the Department of Energy Oak Ridge Field Office Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Suter, G.W. II

    1992-01-01

    This technical memorandum provides guidance for planning and performing ecological risk assessments (ERAs) on the Oak Ridge Reservation (ORR). This work was performed under Work Breakdown Structure 1.4.12.2.3.04.07.02 (Activity Data Sheet 8304) and meets an Environmental Restoration Program milestone for FY 95. The strategy discussed in this report is consistent with the overall strategy for site management and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) compliance developed for the ORR and relevant U.S. Environmental Protection Agency documents and guidance. The general approach and strategy presented herein was developed for the ORR, but it could be applicable to other complex CERCLA sites that possess significant ecological resources.

  8. Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 3: April--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

  9. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 1, Quarterly report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This Oak Ridge Reservation Federal Facility Agreement Quarterly Report for the Environmental Restoration Program was prepared to satisfy requirements for progress reporting on Environmental Restoration Program (ER) activities as specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency, and the Tennessee Department of Environment and Conservation. The reporting period covered in this document is October through December 1995. This work was performed under Work Breakdown Structure 1.4.12.2.3.04 (Activity Data Sheet 8304). Publication of this document meets two FFA milestones. The FFA Quarterly Report meets an FFA milestone defined as 30 days following the end of the applicable reporting period. Appendix A of this report meets the FFA milestone for the Annual Removal Action Report for the period FYs 1991--95. This document provides information about ER Program activities conducted on the Oak Ridge Reservation under the FFA. Specifically, it includes information on milestones scheduled for completion during the reporting period, as well as scheduled for completion during the next reporting period (quarter); accomplishments of the ER Program; concerns related to program work; and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

  10. 78 FR 56153 - National Environmental Policy Act: Categorical Exclusions for Soil and Water Restoration Activities

    Science.gov (United States)

    2013-09-12

    ... events (such as floods, hurricanes, tornados, mechanical/ engineering failures, etc.) to restore uplands... watershed. Roads can also increase sediment routing to streams by creating areas prone to surface runoff... and allowing routes to recover naturally. Project-specific decisions on the appropriate method to...

  11. 77 FR 23741 - DEEPWATER HORIZON Oil Spill; Final Phase I Early Restoration Plan and Environmental Assessment

    Science.gov (United States)

    2012-04-20

    ... Fish and Wildlife Service DEEPWATER HORIZON Oil Spill; Final Phase I Early Restoration Plan and... DEEPWATER HORIZON Oil Spill (Framework Agreement), notice is hereby given that ] the Federal and State... the DEEPWATER HORIZON oil spill, which occurred on or about April 20, 2010, in the Gulf of Mexico....

  12. 77 FR 66626 - Deepwater Horizon Oil Spill; Draft Early Restoration Plan and Environmental Review

    Science.gov (United States)

    2012-11-06

    ... Assessment (Phase I ERP/EA) in April 2012. The Phase I ERP is currently being implemented. In a continuation... to satisfy claims against BP. Overview of the Draft ERP/ER Draft Early Restoration Plan Alternatives, Including Our Proposed Alternative The Draft ERP/ER is being released in accordance with the Oil...

  13. [DOE method for evaluating environmental and waste management samples: Revision 1, Addendum 1

    Energy Technology Data Exchange (ETDEWEB)

    Goheen, S.C.

    1995-04-01

    The US Dapartment of Energy`s (DOE`s) environmental and waste management (EM) sampling and analysis activities require that large numbers of samples be analyzed for materials characterization, environmental surveillance, and site-remediation programs. The present document, DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods), is a supplemental resource for analyzing many of these samples.

  14. Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 2, Interim business systems guidance

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    As part of the Environmental Restoration Program at Martin Marietta, IEM (Information Engineering Methodology) was developed as part of a complete and integrated approach to the progressive development and subsequent maintenance of automated data sharing systems. This approach is centered around the organization`s objectives, inherent data relationships, and business practices. IEM provides the Information Systems community with a tool kit of disciplined techniques supported by automated tools. It includes seven stages: Information Strategy Planning; Business Area Analysis; Business System Design; Technical Design; Construction; Transition; Production. This document focuses on the Business Systems Architecture.

  15. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  16. Savannah River Site Environmental Monitoring Plan. Volume 1, Section 1000 Addendum: Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Jannik, G.T.

    1994-10-01

    This document -- the Savannah River Site Environmental Monitoring Plan (SRS EM Plan) -- has been prepared according to guidance contained in the DOE 5400 Series orders, in 10 CFR 834, and in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and environmental Surveillance [DOE, 1991]. The SRS EM Plan`s purpose is to define the criteria, regulations, and guideline requirements with which SRS will comply. These criteria and requirements are applicable to environmental monitoring activities performed in support of the SRS Environmental Monitoring Program (SRS EM Program), WSRC-3Q1-2, Volume 1, Section 1100. They are not applicable to monitoring activities utilized exclusively for process monitoring/control. The environmental monitoring program requirements documented in the SRS EM Plan incorporate all applicable should requirements of DOE/EH-0173T and expand upon them to include nonradiological environmental monitoring program requirements.

  17. Strategies of environmental restoration of contaminated areas after nuclear accident; Estrategias de restauracion de areas contaminadas tras accidente nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, Jose; Vazquez, Carmen [Centro de Investigaciones Energeticas Medioambientales y Tecnologicas (CIEMAT), Madrid (Spain). Dept. de Impacto Ambiental de la Energia

    2001-07-01

    The paper is framed in the area of restoration of contaminated environments after a nuclear accident. It considers the local specific characteristics of the contaminated scenario as a suitable way to optimize the intervention strategy. In this way, a system of classification of scenarios has been developed according to their potential for transferring radiation and radioactivity to man and their features having influence on the performance of the countermeasures. The established methodology provides the opportunity to jointly consider different types of systems (urban, agricultural, grazing and forest) in the analysis. Also, the consideration in the procedure of factors, not radiological in nature, related to the applicability of the countermeasures, their cost and their secondary effects (including the management and disposal of the wastes generated during the intervention) will improve the management of restoration. As final result a user friendly decision-aiding computerised system has been developed. The system is able to select the best local strategy of restoration when a post-accidental situation with environmental contamination is faced. (author)

  18. 样条磨光的盈亏修正技术与图象反扩散恢复%Comments on Revision Technique in Cubic B-Spline Smoothing An Inverse Diffusion Restoration Understanding

    Institute of Scientific and Technical Information of China (English)

    蔡利栋

    2001-01-01

    The profit-and-loss revision technique may improve the accuracy of approximation to raw image data undergone a cubic B-spline smoothing. Comments are made on this technique from the viewpoint of image smoothing and restoration, giving highlights on the equivalence between spline smoothing and diffusion smoothing, and between profit-and-loss revision and inverse diffusion restoration; formulating the revision operators into a series of renewal recursions together with an estimation to the order of their deviations from the raw data; and exposing the numerical instability of both simple and renewal recursion of the profit and loss revision. Finally, a discussion is further made on the feasibility of applying the profit-and-loss revision to edge detection for images in the presence of noise.%以三阶B-样条作数据磨光时,引入盈亏修正可以在磨光的同时提高逼近原始数据的精度.通过从图象的平滑与恢复处理的角度出发来对盈亏修正技术进行评注,并进一步阐明了样条磨光与扩散平滑、盈亏修正与反扩散恢复在离散条件下的等价关系,给出了用于修正的更新迭代算子序列以及相应的偏差阶数估计,并且指出了盈亏修正的简单迭代和更新迭代都是数值上绝对不稳定的计算;最后讨论了盈亏修正技术在图象边缘探测中的适用性.

  19. Revision of Army regulation (AR) 200-2, environmental effects of Army actions, and the application of total quality mangement (TQM) principles

    Energy Technology Data Exchange (ETDEWEB)

    Merkel, H,K. [Horne Engineering and Environmental Services, Inc., Alexandria, VA (United States); Robitaille, P. [Army Environmental Center (USAEC), Aberdeen Proving Ground, MD (United States)

    1995-12-01

    AR 200-2 is the Army`s implementing regulation to the National Environmental Policy Act (NEPA) and DoD`s NEPA Directive DoDD 6050.1. AR 200-2 was last revised in the late 1980s and since then the scope of Army NEPA compliance activities have significantly increased, and NEPA practice and case law are continually changing. The purpose of revising AR 200-2 is to provide Army personel with clear and Concise guidance on how to meet their NEPA compliance requirements. The revision process included reviewing the current AR 200-2 to identify areas and topics needing clarification or modification; conferring with Army NEPA personnel to obtain views on NEPA compliance practices and procedures; conducting a review and analysis of significant, recent developments in NEPA case law; reviewing other federal NEPA implementing regulations to identify useful, transferrable concepts; preparing a {open_quotes}strawman{close_quotes} version of AR 200-2 to use as a starting point in the revision process; coordinating and consolidating input from the AR 200-2 Revisions Steering Committee; and responding to review comments. A draft version of AR 200-2 has been completed and informal Army-wide comments have been addressed. Some of the issues that the AR 200-2 Revisions Steering Committee considered during the revision effort included expanding the list of categorical exclusions, determining the appropriate length for the public comment period for environmental assessments prior to approval of the finding of no significant impact, determining the appropriate level of analysis for Army actions abroad, and determining whether Comprehensive Environmental Response Compensation Liability Act (CERCLA) or Resource Conservation and Recovery Act (RCRA) actions should be addressed under NEPA. Total Quality Management (TQM) principles were applied during the revision process. GroupSystems{trademark} software was used as a vehicle to enhance total group participation from managers to practitioners.

  20. Sex in an uncertain world: environmental stochasticity helps restore competitive balance between sexually and asexually reproducing populations.

    Science.gov (United States)

    Park, A W; Vandekerkhove, J; Michalakis, Y

    2014-08-01

    Like many organisms, individuals of the freshwater ostracod species Eucypris virens exhibit either obligate sexual or asexual reproductive modes. Both types of individual routinely co-occur, including in the same temporary freshwater pond (their natural habitat in which they undergo seasonal diapause). Given the well-known two-fold cost of sex, this begs the question of how sexually reproducing individuals are able to coexist with their asexual counterparts in spite of such overwhelming costs. Environmental stochasticity in the form of 'false dawn' inundations (where the first hydration is ephemeral and causes loss of early hatching individuals) may provide an advantage to the sexual subpopulation, which shows greater variation in hatching times following inundation. We explore the potential role of environmental stochasticity in this system using life-history data analysis, climate data, and matrix projection models. In the absence of environmental stochasticity, the population growth rate is significantly lower in sexual subpopulations. Climate data reveal that 'false dawn' inundations are common. Using matrix projection modelling with and without environmental stochasticity, we demonstrate that this phenomenon can restore appreciable balance to the system, in terms of population growth rates. This provides support for the role of environmental stochasticity in helping to explain the maintenance of sex and the occurrence of geographical parthenogenesis. © 2014 The Authors. Journal of Evolutionary Biology © 2014 European Society For Evolutionary Biology.

  1. Environmental Restoration - Expedient Methods and Technologies: A User Guide with Case Studies

    Science.gov (United States)

    1998-03-01

    ground water table, creating a depression . For fuel products that float on the ground water table, free product moves into the depression and, in theory...free fuel and/or ground water) and soil gas. Since a cone of depression is not required to remove free product, a bioslurper system can be adjusted to...and dense macro- and microbiota . Besides conservation and restoration of our existing wetlands, construction of carefully designed wetlands can serve

  2. Environmental Assessment for Mill Creek Restoration Project, Eglin Air Force Base, FL

    Science.gov (United States)

    2007-02-28

    Persons Contacted Mr. Chris Metcalf , U.S. Fish and Wildlife Service Mr Bob Miller, 96 CEG/CEVSN, Endangered Species Biologist Mr Mike Nunley, 96 CEG...currents into the center of the channel, and preventing back eddy erosion. In addition, these structures provide excellent fish habitat, maintain...bank protection and limit any back eddy erosion. 05/06 Biological Assessment Page A-13 for Mill Creek Restoration Project Eglin Air Force Base

  3. Final Environmental Assessment: Demolition/Restoration of Ipswich Antenna Test Facility

    Science.gov (United States)

    2012-05-01

    land be renoved by the tenant and that the land be restored to its nacural condition prior to the surrender of the premises . All utilities now S...state archaeological permit (950 CMT 70) issued by the Massachusetts State Archaeologist /MHC. 5. Following demolition and removal activities, the...estimates for the projel.’tlaction ( i.e., construction/ renovation and operational phases a.rc anaehcd 3nd included in the r-.ffiPA documentation). 03te

  4. Oak Ridge Reservation Federal Facility agreement quarterly report for the Environmental Restoration Program, January--March 1994. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is January through March 1994 (second quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments. Section 2 covers significant accomplishments. Section 3 discusses technical status at the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, Oak Ridge K-25 Site, and Clinch River. Technical oversight and technical programs are also covered. Section 4 covers responds action contractor assignments.

  5. Weldon spring site environmental report for calendar year 1996. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-23

    This Site Environmental Report for Calendar Year 1996 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels and regulations, and to summarize trends and/or changes in contaminant concentrations identified through environmental monitoring.

  6. 77 FR 38246 - Revisions to the Arizona State Implementation Plan, Arizona Department of Environmental Quality...

    Science.gov (United States)

    2012-06-27

    ... Deviations,'' EPA, May 25, 1988 (the Bluebook). 2. ``Guidance Document for Correcting Common VOC & Other Rule... environmental effects with practical, appropriate, and legally permissible methods under Executive Order...

  7. Assessment, evaluation, and testing of technologies for environmental restoration, decontamination, and decommissioning and high level waste management. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Uzochukwu, G.A.

    1997-12-31

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration, decontamination and decommissioning, and high-level waste management objectives are being assessed and evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objectives of the environmental restoration, decontamination and decommissioning, and high-level waste management effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites.

  8. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

  9. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement. Summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  10. Hazardous waste database: Waste management policy implications for the US Department of Energy`s Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    Lazaro, M.A.; Policastro, A.J.; Antonopoulos, A.A.; Hartmann, H.M.; Koebnick, B.; Dovel, M. [Argonne National Lab., IL (United States); Stoll, P.W. [COMPASS Environmental Compliance Associates, Boise, ID (United States)

    1994-03-01

    The hazardous waste risk assessment modeling (HaWRAM) database is being developed to analyze the risk from treatment technology operations and potential transportation accidents associated with the hazardous waste management alternatives. These alternatives are being assessed in the Department of Energy`s Environmental Restoration and Waste Management Programmatic Environmental Impact Statement (EM PEIS). To support the risk analysis, the current database contains complexwide detailed information on hazardous waste shipments from 45 Department of Energy installations during FY 1992. The database is currently being supplemented with newly acquired data. This enhancement will improve database information on operational hazardous waste generation rates, and the level and type of current on-site treatment at Department of Energy installations.

  11. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part A

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  12. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  13. 77 FR 9694 - Notice of Availability of the Draft Environmental Impact Statement for the Restoration Design...

    Science.gov (United States)

    2012-02-17

    ... Resource Management Plans (RMPs) to identify lands across Arizona that may be suitable for developing renewable solar and wind energy, and to establish a baseline set of environmental protection measures for... set of environmental protection measures for such projects. The BLM is proposing to identify Renewable...

  14. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  15. Third annual environmental restoration monitoring and assessment report for FY 1994 of the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Clapp, R.B.; Watts, J.A.; Guth, M.A.S. [eds.

    1994-09-01

    This report summarizes the salient features of the annual efforts of environmental monitoring, field investigations, and assessments conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, providing an ORNL site-wide perspective on types, distribution, and transport of contamination. The results presented are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) Project. WAG 2 is the lower portion of the White Oak Creek system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The Remedial Investigation Plan (DOE 1992) for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2`s role as an integrator and the major conduit of contaminants from the ORNL site. During FY 1992, the remedial investigation activities were integrated with a series of environmental monitoring and SI activities at ORNL that address pathways and processes important for contaminant movement to gain a more integrated perspective of contamination movement at the watershed scale.

  16. A fuzzy quality index for the environmental assessment of a restored wetland.

    Science.gov (United States)

    Giusti, E; Marsili-Libelli, S; Mattioli, S

    2011-01-01

    This paper describes the feasibility study for the restoration of agricultural land with a tendency to become waterlogged into a natural wetland, conceived to mitigate floods and to remove nutrients from the water drained from the cultivated plots. The wetland model, developed in aquatox, includes the nutrient dynamics both in the water and in the sediment, and the vegetation that is expected to develop as a consequence of flooding. The model inputs were synthesized from historical time series of rainfall and chemical data collected over the last decade. The model outputs are used to compute a synthetic fuzzy quality index (FQI) to assess the removal efficiency of the wetland. This FQI is based on three main variables describing the ecosystem quality: chlorophyll-a, dissolved oxygen and total suspended solids. This index has the merit of being simple enough to be immediately grasped by non-technical people, like managers and stakeholders, to whom the restoration project is proposed. The simulations, performed under five differing loading scenarios demonstrate the feasibility of this solution, which is robust enough to accommodate a 50% increase in either nitrogen, phosphorous or organic matter.

  17. Environmental Assessment : Proposed construction, restoration and rehabilitative project : Big Lake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document includes the Environmental Assessment (EA), Finding of No Significant Impact (FONSI), Section 7 Evaluation, and Compatibility Determination for the...

  18. Assessing regional environmental quality by integrated use of remote sensing, GIS, and spatial multi-criteria evaluation for prioritization of environmental restoration.

    Science.gov (United States)

    Rahman, Md Rejaur; Shi, Z H; Chongfa, Cai

    2014-11-01

    This study was an attempt to analyse the regional environmental quality with the application of remote sensing, geographical information system, and spatial multiple criteria decision analysis and, to project a quantitative method applicable to identify the status of the regional environment of the study area. Using spatial multi-criteria evaluation (SMCE) approach with expert knowledge in this study, an integrated regional environmental quality index (REQI) was computed and classified into five levels of regional environment quality viz. worse, poor, moderate, good, and very good. During the process, a set of spatial criteria were selected (here, 15 criterions) together with the degree of importance of criteria in sustainability of the regional environment. Integrated remote sensing and GIS technique and models were applied to generate the necessary factors (criterions) maps for the SMCE approach. The ranking, along with expected value method, was used to standardize the factors and on the other hand, an analytical hierarchy process (AHP) was applied for calculating factor weights. The entire process was executed in the integrated land and water information system (ILWIS) software tool that supports SMCE. The analysis showed that the overall regional environmental quality of the area was at moderate level and was partly determined by elevation. Areas under worse and poor quality of environment indicated that the regional environmental status showed decline in these parts of the county. The study also revealed that the human activities, vegetation condition, soil erosion, topography, climate, and soil conditions have serious influence on the regional environment condition of the area. Considering the regional characteristics of environmental quality, priority, and practical needs for environmental restoration, the study area was further regionalized into four priority areas which may serve as base areas of decision making for the recovery, rebuilding, and

  19. Coastal Zone Management Act and related legislation: Revision 3. Environmental Guidance Program Reference Book

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-15

    In recognition of the increasing pressures upon the nation`s coastal resources, Congress enacted the Coastal Zone Management Act in 1972. Its purpose is to encourage states to preserve, protect, develop, and, where possible, restore or enhance such valuable natural resources as wetlands, floodplains, estuaries, beaches, dunes, barrier islands, and coral reefs, as well as the fish and wildlife utilizing those habitats. A unique feature of the Act is that participation by states is voluntary. One key provision for encouraging states to participate is the availability of federal financial assistance to any coastal state or territory, including those on the Great Lakes, which is willing to develop and implement a comprehensive coastal management program. Additionally, the Coastal Barrier Resources Act (CBRA) was passed in 1983. This report contains the legislative history and statues associated with each Act. Regulations for implementation and other guidance are included.

  20. The Western Environmental Technology Office (WETO), Butte, Montana. Technology summary (Revised)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This document has been prepared by the US Department of Energy`s (DOE`s) Office of Environmental Management (EM) Office of Science and Technology (OST) to highlight its research, development, demonstration, testing, and evaluation (RDDT&E) activities funded through the Western environmental Technology Office (WETO) in Butte, Montana. Technologies and processes described in this document have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. The information presented in this document has been assembled from recently produced OST documents that highlight technology development activities within each of the OST program elements and Focus Areas. This document presents one in a series for each of DOE`s Operations Office and Energy Technology Centers.

  1. Data summary for the near-shore sediment characterization task of the Clinch River Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Levine, D.A.; Hargrove, W.W.; Campbell, K.R.; Wood, M.A.; Rash, C.D.

    1994-10-01

    This report presents the results of the Near-Shore Sediment Characterization Task of the Clinch River Environmental Restoration Program (CR-ERP). The goals of the task were to (1) determine the extent to which near-shore surface sediments are contaminated by releases from the Oak Ridge Reservation (ORR) and (2) provide data for the Watts Bar Reservoir Interagency Permitting Group (WBRIPG) to evaluate the human health risks from exposure to sediments during and following dredging operations. The data collected for this task are also to be used in the Remedial Investigation/Feasibility Study (RLTS) for the CR-ERP operable units (Lower Watts Bar and Clinch River) to characterize the human health risk associated with exposure to near-shore sediments throughout the Watts Bar Reservoir.

  2. Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

  3. Integrating environmental restoration management within DOE using an alternative identification and evaluation procedure: A methodology and a case history

    Energy Technology Data Exchange (ETDEWEB)

    Devaurs, M.; Brooks, D.; Kelly, E.; Wagner, S.; Vocke, R.

    1992-03-01

    The process of identifying and evaluating alternative corrective measures is a fundamental integrating part of Environmental Restoration (ER) activities. The process used in the Los Alamos National Laboratory (the Laboratory) ER Program is based on principles and tools from multiattribute decision analysis, a well-developed and proven method for evaluating options in decision situations involving multiple objectives, uncertainty, multiple interested stakeholders in the final decision, and the need for technical input from disparate disciplines. The process provides a methodology that has been extensively developed and reviewed over the past five decades; it provides a methodological structure for incorporating the concepts espoused in the streamlined approach as well as more specific guidelines such as data quality objectives (DQOs). The application of this methodology to the ER Program at Los Alamos is described in this paper.

  4. Summary of activities of the life cycle costing workshop conducted by the Environmental Restoration Program of Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-01

    A five-day life cycle workshop was conducted by the Environmental Restoration (FR) Program of Oak Ridge National Laboratory (ORNL) to develop appropriate remediation scenarios for each Waste Area Grouping (WAG) at ORNL and to identify associated data needs (e.g., remedial investigations, special studies, and technology demonstrations) and required interfaces. Workshop participants represented the Department of Energy, Martin Marietta Energy Systems, Inc., Bechtel National, Radian Corporation, EBASCO Corporation, and M-K Ferguson. The workshop was used to establish a technical basis for remediation activities at each WAG. The workshop results are documented in this report and provide the baseline for estimating the technical scope for each WAG. The scope and associated budgets and schedules will be summarized in baseline reports for each WAG, which, in turn, will be compiled into an overall strategy document for ORNL ER.

  5. ANL Technical Support Program for DOE Environmental Restoration and Waste Management; Annual report, October 1992--September 1993

    Energy Technology Data Exchange (ETDEWEB)

    Bates, J.K.; Bourcier, W.L.; Bradley, C.R. [and others

    1994-06-01

    This report is an overview of the progress during FY 1993 for the Technical Support Program that is part of the ANL Technology Support Activity for DOE Environmental Restoration and Waste Management (EM). The purpose is to evaluate, before hot start-up of the Defense Waste Processing Facility (DWPF) and the West Valley Demonstration Project (WVDP), factors that are anticipated to affect glass reaction in an unsaturated environment typical of what may be expected for the candidate Yucca Mountain repository site. Specific goals for the testing program include the following: reviewing and evaluating available data on parameters that will be important in establishing the long-term performance of glass in a repository environment; performing tests to further quantify the effects of important variables where there are deficiencies in the available data; and initiating long-term tests to determine glass performance under a range of conditions applicable to repository disposal.

  6. ANL Technical Support Program for DOE Environmental Restoration and Waste Management. Annual report, October 1990--September 1991

    Energy Technology Data Exchange (ETDEWEB)

    Bates, J.K.; Bradley, C.R.; Buck, E.C.; Cunnane, J.C.; Dietz, N.L.; Ebert, W.L.; Emery, J.W.; Feng, X.; Gerding, T.J.; Gong, M.; Hoh, J.C.; Mazer, J.J.; Wronkiewicz, D.J. [Argonne National Lab., IL (United States); Bourcier, W.L.; Morgan, L.E.; Nielsen, J.K.; Steward, S.A. [Lawrence Livermore National Lab., CA (United States); Ewing, R.C.; Wang, L.M. [New Mexico Univ., Albuquerque, NM (United States); Han, W.T.; Tomozawa, M. [Rensselaer Polytechnic Inst., Troy, MI (United States)

    1992-03-01

    This report provides an overview of progress during FY 1991 for the Technical Support Program that is part of the ANL Technology Support Activity for DOE, Environmental Restoration and Waste Management (EM). The purpose is to evaluate, before hot start-up of the Defenses Waste Processing Facility (DWPF) and the West Valley Demonstration Project (WVDP), factors that are likely to affect glass reaction in an unsaturated environment typical of what may be expected for the candidate Yucca Mountain repository site. Specific goals for the testing program include the following: (1) to review and evaluate available information on parameters that will be important in establishing the long-term performance of glass in a repository environment; (2) to perform testing to further quantify the effects of important variables where there are deficiencies in the available data; and (3) to initiate long-term testing that will bound glass performance under a range of conditions applicable to repository disposal.

  7. Clinch River - Environmental Restoration Program (CR-ERP) Study, ambient water toxicity. Final report, October 21, 1993--October 28, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Simbeck, D.J.

    1997-06-01

    Clinch River - Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a study during the week of October 21-28, 1993, as described in the Statement of Work (SOW) document. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Due to serious reproduction/embryo abortion problems with the TVA daphnid cultures, TVA conducted tests during this study period using only fathead minnows. A split sample test using daphnids only will be scheduled during 1994 as a substitute for this study period. Surface water samples were collected by TVA Field Engineering personnel from Poplar Creek Mile 2.9, Mile 4.3, and Mile 5.1 on October 20, 22, and 25. Samples were split and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms to these samples resulted in no toxicity (survival or growth) in testing conducted by TVA.

  8. Management approaches for improving environmental restoration at the Savannah River Site: Projectization, performance, and communications; Savannah River Site, Aiken, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Pope, J.M.; Hoffman, W.D. (Westinghouse Savannah River Co., Aiken, SC (United States)); Goidell, L. (USDOE, Washington, DC (United States))

    1993-01-01

    The purpose of this paper is to communicate how new and established management techniques are applied to environmental restoration projects at the Savannah River Site. Specifically, the paper discusses application of four (4) management approaches: Total Quality Principles; Task Team Structure; Cost Time Management; SAFER (Streamlined Approach for Environmental Restoration). The objective is to share Savannah River Site experience and document case studies where certain approaches have enhanced projects at hand. Each management approach is demonstrated by its project application and impact on performance. The visibility given the project is discussed to emphasize communications as avenues for public information, technical exchange, and employee motivation.

  9. Management approaches for improving environmental restoration at the Savannah River Site: Projectization, performance, and communications; Savannah River Site, Aiken, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Pope, J.M.; Hoffman, W.D. [Westinghouse Savannah River Co., Aiken, SC (United States); Goidell, L. [USDOE, Washington, DC (United States)

    1993-02-01

    The purpose of this paper is to communicate how new and established management techniques are applied to environmental restoration projects at the Savannah River Site. Specifically, the paper discusses application of four (4) management approaches: Total Quality Principles; Task Team Structure; Cost Time Management; SAFER (Streamlined Approach for Environmental Restoration). The objective is to share Savannah River Site experience and document case studies where certain approaches have enhanced projects at hand. Each management approach is demonstrated by its project application and impact on performance. The visibility given the project is discussed to emphasize communications as avenues for public information, technical exchange, and employee motivation.

  10. 78 FR 53186 - Revised Notice of Intent To Prepare an Environmental Impact Statement: Milwaukee County, Wisconsin

    Science.gov (United States)

    2013-08-28

    ... is located in Milwaukee County, Wisconsin. FOR FURTHER INFORMATION CONTACT: Bethaney Bacher-Gresock, Environmental Program Manager, FHWA Wisconsin Division Office, City Center West, 525 Junction Road, Suite 8000... necessary east of 25th Street to accommodate alternatives that would tie back into I-94 near 16th Street...

  11. Power politics in the revision of China’s Environmental Protection Law

    NARCIS (Netherlands)

    Zhang, L.; He, G.; Mol, A.P.J.; Zhu, X.

    2013-01-01

    Environmental law making, like other legislative processes in China, used to take place behind closed doors. A major innovation in recent years is that it is now normal to consult the public on draft laws, although it is not yet prescribed in the Law on Legislation. It is tempting to interpret the d

  12. Global Physiographic and Climatic Maps to Support Revision of Environmental Testing Guidelines

    Science.gov (United States)

    2009-07-06

    other words , the attached maps provide multiple views of key global environmental conditions that will enhance identification of the type and the global...Very Low Udox Low Shifting Sand Very High Ustults Moderate Humods Very Low Ustox Moderate Xerults High Orthods Very Low Torrox Very High TABLE  3‐1.    L

  13. 77 FR 1717 - Notice of Availability; Draft Springfield Plateau Regional Restoration Plan and Environmental...

    Science.gov (United States)

    2012-01-11

    ... availability; request for public comments. SUMMARY: The United States Department of the Interior (DOI), acting... National Environmental Policy Act (NEPA). The purpose of this notice is to inform the public of the... ``belonging to, managed by, controlled by or appertaining to the United States'' to act as ``trustees''...

  14. A Preliminary Environmental Assessment for the Preservation and Restoration of Fujian Hakka Tulou Complexes

    Directory of Open Access Journals (Sweden)

    Minoru Ueda

    2012-10-01

    Full Text Available In 2007 and 2009, research trips were taken, mainly in the Fujian province of China, to investigate the construction materials, methods, structures and floor plans of Hakka Tulou. Researchers lived in several Tulou, interviewed residents and experienced traditional Hakka lifestyle. Typically, Tulou are located in remote regions at relatively high elevations in climatic conditions characterized by hot summers, cold winters, and with high incidents of typhoons and earthquakes. The extent of damage and level of preservation were examined with respect to the age of many of these structures, the relatively harsh environment, and changing demographics in the region. The majority of occupants are now elderly. They maintain a traditional and efficient lifestyle utilizing minimum electricity, water, and energy. This study discusses the findings from these two field trips and assesses environmental load and sustainability within the context of current environmental standards using the Japanese Comprehensive Assessment System for Building Environmental Efficiency (CASBEE from data collected at Cheng Qi Lou. The goal was: firstly to undertake a preliminary environmental assessment to determine sustainable elements of Hakka Tulou construction methods; secondly, to identify potential sustainable solutions to preserve existing structure; and finally, to identify appropriate sustainable solutions to repair and retrofit damaged and underutilized structures to modern living standards, while retaining traditional building techniques and lifestyle.

  15. The DoD Environmental Restoration Program: An Air Force Perspective and Status Update

    Science.gov (United States)

    2011-11-01

    interest (Mn in soil/inhalation) Initial stages of evaluation Naphthalene Change in regulatory standards On hold unless environmental issue emerges PAH ...Additional site characterizations (nature and extent) Field dem/val for alternative treatment approaches ( biodegradation ) AF EI/EC Response to PFCs

  16. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada; Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads, drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI.

  17. Cascadia GeoSciences: Community-Based Earth Science Research Focused on Geologic Hazard Assessment and Environmental Restoration.

    Science.gov (United States)

    Williams, T. B.; Patton, J. R.; Leroy, T. H.

    2007-12-01

    Cascadia GeoSciences (CG) is a new non-profit membership governed corporation whose main objectives are to conduct and promote interdisciplinary community based earth science research. The primary focus of CG is on geologic hazard assessment and environmental restoration in the Western U.S. The primary geographic region of interest is Humboldt Bay, NW California, within the southern Cascadia subduction zone (SCSZ). This region is the on-land portion of the accretionary prism to the SCSZ, a unique and exciting setting with numerous hazards in an active, dynamic geologic environment. Humboldt Bay is also a region rich in history. Timber harvesting has been occurring in California's coastal forestlands for approximately 150 years. Timber products transported with ships and railroads from Mendocino and Humboldt Counties helped rebuild San Francisco after the 1906 earthquake. Historic land-use of this type now commonly requires the services of geologists, engineers, and biologists to restore road networks as well as provide safe fish passage. While Humboldt Bay is a focus of some of our individual research goals, we welcome regional scientists to utilize CG to support its mission while achieving their goals. An important function of CG is to provide student opportunities in field research. One of the primary charitable contributions of the organization is a student grant competition. Funds for the student grant will come from member fees and contributions, as well as a percent of all grants awarded to CG. A panel will review and select the student research proposal annually. In addition to supporting student research financially, professional members of CG will donate their time as mentors to the student researchers, promoting a student mentor program. The Humboldt Bay region is well suited to support annual student research. Thorough research like this will help unravel some of the mysteries of regional earthquake-induced land-level changes, as well as possible fault

  18. Basic science and its relationship to environmental restoration: Preparing for the 21. century. Summary report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The Department of Energy (DOE) funded the two day meeting in order to focus on ways to organize and mobilize the scientific community to effectively address the maze of global environmental problems. Using the Office of Energy Research (ER) as a Test Case, the participants were asked to address such questions as: What are the problems ER can effectively address? Is there a hierarchy of issues involved in attacking those problems? Are there new multi-disciplinary constructs that should be encouraged in the university environment, much like the applied science departments that developed at many institutions in the 1970`s and 1980`s; and/or in the national laboratories? What does it take to get the best minds in the university and national laboratory environments actively engaged in investigations of fundamental environmental problems? If such a beginning can be made, how should its significance be communicated to other agencies?

  19. Preliminary environmental assessment for the satellite power system (SPS). Revision 1. Volume 1. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    A preliminary assessment of the environmental impacts of the proposed satellite power system (SPS) is summarized here. In this system, satellites would collect solar energy in space, convert it to microwaves, and transmit the microwaves to receiving antennas (rectennas) on earth. At the rectennas, the microwaves would be converted to electricity. The assessment considers microwave and nonmicrowave effects on the terrestrial environment and human health, atmospheric effects, and disruption of communications and other electromagnetic systems.

  20. 2003 Fernald Environmental Management Project Annual Illness and Injury Surveillance Report, Revised September 2007

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-04

    Annual Illness and Injury Surveillance Program report for 2003 for the Fernald Environmental Management Project. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  1. Environmental Assessment for Restoration and Stabilization of Eastern Shoreline MacDill AFB, Florida

    Science.gov (United States)

    2005-12-01

    1990). Dense seagrasses also serve as shelter or nursery grounds for many invertebrates and fish, including marine snails, clams, scallops, polychaete...989, the U.S. Air Force conducted an assessment of the potential environmental consequences associated with implementation of the following Proposed... associated with implementation of the Proposed Action are summarized below and are discussed in detail in Section 4.0 of the EA. Page 1 of4 Finding of No

  2. United States Air Force Environmental Restoration Program. Guidance on Soil Vapor Extraction Optimization

    Science.gov (United States)

    2001-06-01

    DoD Department of Defense DNAPL Dense non-aqueous phase liquid DPE dual-phase extraction DQO Data quality objective ECD electron capture device...EPA Environmental Protection Agency ER electrical resistance FID flame ionization detector Hg Mercury MCL maximum contaminant level MCLG Maximum...Well Ground Surface Soil (Advection) V a d o s e Z o n e (Diffusion) Massive Clay Sand Sand Vadose Zone Groundwater Zone LNAPL DNAPL Groundwater Table

  3. Recommended environmental dose calculation methods and Hanford-specific parameters. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Schreckhise, R.G.; Rhoads, K.; Napier, B.A.; Ramsdell, J.V. [Pacific Northwest Lab., Richland, WA (United States); Davis, J.S. [Westinghouse Hanford Co., Richland, WA (United States)

    1993-03-01

    This document was developed to support the Hanford Environmental Dose overview Panel (HEDOP). The Panel is responsible for reviewing all assessments of potential doses received by humans and other biota resulting from the actual or possible environmental releases of radioactive and other hazardous materials from facilities and/or operations belonging to the US Department of Energy on the Hanford Site in south-central Washington. This document serves as a guide to be used for developing estimates of potential radiation doses, or other measures of risk or health impacts, to people and other biota in the environs on and around the Hanford Site. It provides information to develop technically sound estimates of exposure (i.e., potential or actual) to humans or other biotic receptors that could result from the environmental transport of potentially harmful materials that have been, or could be, released from Hanford operations or facilities. Parameter values and information that are specific to the Hanford environs as well as other supporting material are included in this document.

  4. Integrating active restoration with environmental flows to improve native riparian tree establishment in the Colorado River Delta

    Science.gov (United States)

    Schlatter, Karen; Grabau, Matthew R.; Shafroth, Patrick B.; Zamora-Arroyo, Francisco

    2017-01-01

    Drastic alterations to river hydrology, land use change, and the spread of the nonnative shrub, tamarisk (Tamarix spp.), have led to the degradation of riparian habitat in the Colorado River Delta in Mexico. Delivery of environmental flows to promote native cottonwood (Populus spp.) and willow (Salix spp.) recruitment in human-impacted riparian systems can be unsuccessful due to flow-magnitude constraints and altered abiotic–biotic feedbacks. In 2014, an experimental pulse flow of water was delivered to the Colorado River in Mexico as part of the U.S.-Mexico binational agreement, Minute 319. We conducted a field experiment to assess the effects of vegetation removal, seed augmentation, and environmental flows, separately and in combination, on germination and first-year seedling establishment of cottonwood, willow, and tamarisk at five replicate sites along 5 river km. The relatively low-magnitude flow deliveries did not substantively restore natural fluvial processes of erosion, sediment deposition, and vegetation scour, but did provide wetted surface soils, shallow groundwater, and low soil salinity. Cottonwood and willow only established in wetted, cleared treatments, and establishment was variable in these treatments due to variable site conditions and inundation duration and timing. Wetted soils, bare surface availability, soil salinity, and seed availability were significant factors contributing to successful cottonwood and willow germination, while soil salinity and texture affected seedling persistence over the growing season. Tamarisk germinated and persisted in a wider range of environmental conditions than cottonwood and willow, including in un-cleared treatment areas. Our results suggest that site management can increase cottonwood and willow recruitment success from low-magnitude environmental flow events, an approach that can be applied in other portions of the Delta and to other human-impacted riparian systems across the world with similar

  5. Environmental tracers for elucidating the weathering process in a phosphogypsum disposal site: Implications for restoration

    Science.gov (United States)

    Pérez-López, Rafael; Nieto, José M.; de la Rosa, Jesús D.; Bolívar, Juan P.

    2015-10-01

    This study provides geochemical data with the aim of identifying and tracing the weathering of phosphogypsum wastes stack-piled directly on salt-marshes of the Tinto River (Estuary of Huelva, SW Spain). With that purpose, different types of highly-polluted acid solutions were collected in the stack. Connection between these solutions and the estuarine environment was studied by geochemical tracers, such as rare earth elements (REE) and their North American Shale Composite (NASC)-normalized patterns and Cl/Br ratios. Phosphogypsum-related wastewaters include process water stored on the surface, pore-water contained in the phosphogypsum profile and edge outflow water emerging from inside the stack. Edge outflow waters are produced by waterlogging at the contact between phosphogypsum and the nearly impermeable marsh surface and discharge directly into the estuary. Process water shows geochemical characteristics typical of phosphate fertilizers, i.e. REE patterns with an evident enrichment of heavy-REE (HREE) with respect to middle-REE (MREE) and light-REE (LREE). By contrast, REE patterns of deeper pore-water and edge outflows are identical to those of Tinto River estuary waters, with a clear enrichment of MREE relative to LREE and HREE denoting influence of acid mine drainage. Cl/Br ratios of these solutions are very close to that of seawater, which also supports its estuarine origin. These findings clearly show that process water is not chemically connected with edge outflows through pore-waters, as was previously believed. Phosphogypsum weathering likely occurs by an upward flow of seawater from the marsh because of overpressure and permeability differences. Several recommendations are put forward in this study to route restoration actions, such as developing treatment systems to improve the quality of the edge outflow waters before discharging to the receiving environment.

  6. Applicable or Relevant and Appropriate Requirements (ARARs) for Remedial Action at the Oak Ridge Reservation: A compendium of major environmental laws. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Etnier, E.L.; McDonald, E.P.; Houlberg, L.M.

    1993-07-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances must comply with applicable or relevant and appropriate requirements (ARARS) or standards under federal and state environmental laws. The US Department of Energy (DOE) Oak Ridge Reservation (ORR) was placed on the National Priorities List by the US Environmental Protection Agency (EPA) on November 21, 1989, effective December 21, 1989. As a result of this listing, DOE, EPA, and the Tennessee Department of Environment and Conservation have signed a Federal Facility Agreement (FFA) for the environmental restoration of the ORR. Section XXI(F) of the FFA calls for the preparation of a draft listing of all ARARs as mandated by CERCLA {section}121. This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at the ORR. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Tennessee are listed in tables. In addition, the major provisions of the Resource Conservation and Recovery Act, the Safe Drinking Water Act, the Clean Water Act, the Clean Air and other acts, as they apply to hazardous waste cleanup, are discussed. In the absence of ARARS, CERCLA {section}121 provides for the use of nonpromulgated federal criteria, guidelines, and advisories in evaluating the human risk associated with remedial action alternatives. Such nonpromulgated standards are classified as ``to-be-considered`` (TBC) guidance. A ion of available guidance is given; summary tables fist the available federal standards and guidance information. In addition, the substantive contents of the DOE orders as they apply to remediation of radioactively contaminated sites are discussed as TBC guidance.

  7. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.

    1992-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993.

  8. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information and process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  9. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action.

  10. 75 FR 41881 - Notice of Intent To Prepare a Shoreline Restoration and Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-07-19

    ... include: Restoration or replication of natural shoreline sand movement; foredune/dune restoration and... Impact Statement (EIS) for Indiana Dunes National Lakeshore, Indiana SUMMARY: Pursuant to Section 102(2... Restoration and Management Plan (SRMP) for Indiana Dunes National Lakeshore (Park), Indiana. The EIS will be...

  11. 75 FR 20826 - Notice of Intent To Prepare a Draft Environmental Impact Statement on Beach and Dune Restoration...

    Science.gov (United States)

    2010-04-21

    ... on Beach and Dune Restoration in St. Lucie County, FL AGENCY: U.S. Army Corps of Engineers... Erosion Control District (County) to construct a beach nourishment and dune restoration project along St... associated with beach nourishment and dune restoration. The primary Federal involvement associated with...

  12. International technology catalogue: Foreign technologies to support the environmental restoration and waste management needs of the DOE complex

    Energy Technology Data Exchange (ETDEWEB)

    Matalucci, R.V. [ed.] [Sandia National Labs., Albuquerque, NM (United States). International Programs Dept.; Jimenez, R.D.; Esparza-Baca, C. [ed.] [Applied Sciences Lab., Inc., Albuquerque, NM (United States)

    1995-07-01

    This document represents a summary of 27 foreign-based environmental restoration and waste management technologies that have been screened and technically evaluated for application to the cleanup problems of the Department of Energy (DOE) nuclear weapons complex. The evaluation of these technologies was initiated in 1992 and completed in 1995 under the DOE`s International Technology Coordination Program of the Office of Technology Development. A methodology was developed for conducting a country-by-country survey of several regions of the world where specific environmental technology capabilities and market potential were investigated. The countries that were selected from a rank-ordering process for the survey included: then West Germany, the Netherlands, France, Japan, Taiwan, the Czech and Slovak Republics, and the Former Soviet Union. The notably innovative foreign technologies included in this document were screened initially from a list of several hundred, and then evaluated based on criteria that examined for level of maturity, suitability to the DOE needs, and for potential cost effective application at a DOE site. Each of the selected foreign technologies that were evaluated in this effort for DOE application were subsequently matched with site-specific environmental problem units across the DOE complex using the Technology Needs Assessment CROSSWALK Report. For ease of tracking these technologies to site problem units, and to facilitate their input into the DOE EnviroTRADE Information System, they were categorized into the following three areas: (1) characterization, monitoring and sensors, (2) waste treatment and separations, and (3) waste containment. Technical data profiles regarding these technologies include title and description, performance information, development status, key regulatory considerations, intellectual property rights, institute and contact personnel, and references.

  13. Bioenergy Watershed Restoration in Regions of the West: What are the Environmental/Community Issues?

    Energy Technology Data Exchange (ETDEWEB)

    Graham, R.L.; Huff, D.D.; Kaufmann, M.R.; Shepperd, W.D.; Sheehan, J.

    1999-07-01

    Throughout the western mountainous regions, wildfire risks are elevated due to both fire suppression activities which have changed the forest structure making it more susceptible to stand-killing fires and the expansion of human structures (houses, light commercial) into these same forests, By providing a market for currently noncommercial but flammable materials (small trees, tops, and branches), new and existing bioenergy industries could be a key factor in reducing the regional forest fuel loads. Although bioenergy would appear to be an ideal answer to the problem in many ways, the situation is complicated and numerous issues need resolution. A public fearful of logging in these regions needs assurance that harvesting for bioenergy is an environmentally and socially responsible solution to the current fuel build up in these forests. This is especially important given that biomass harvesting cannot pay its own way under current energy market conditions and would have to be supported in some fashion.

  14. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

  15. Nuclear Operations Application to Environmental Restoration at Corrective Action Unit 547, Miscellaneous Contaminated Waste Sites, at the Nevada National Security Site

    Energy Technology Data Exchange (ETDEWEB)

    Kevin Cabble (NSO), Mark Krauss and Patrick Matthews (N-I)

    2011-03-03

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office has responsibility for environmental restoration at the Nevada National Security Site (formerly the Nevada Test Site). This includes remediation at locations where past testing activities have resulted in the release of plutonium to the environment. One of the current remediation efforts involves a site where an underground subcritical nuclear safety test was conducted in 1964. The underground test was vented through a steel pipe to the surface in a closed system where gas samples were obtained. The piping downstream of the gas-sampling apparatus was routed belowground to a location where it was allowed to vent into an existing radioactively contaminated borehole. The length of the pipe above the ground surface is approximately 200 meters. This pipe remained in place until remediation efforts began in 2007, at which time internal plutonium contamination was discovered. Following this discovery, an assessment was conducted to determine the quantity of plutonium present in the pipe. This site has been identified as Corrective Action Unit (CAU) 547, Miscellaneous Contaminated Waste Sites. The quantity of plutonium identified at CAU 547 exceeded the Hazard Category 3 threshold but was below the Hazard Category 2 threshold specified in DOE Standard DOE-STD-1027-92. This CAU, therefore, was initially categorized as a Hazard Category 3 environmental restoration site. A contaminated facility or site that is initially categorized as Hazard Category 3, however, may be downgraded to below Hazard Category 3 if it can be demonstrated through further analysis that the form of the material and the energy available for release support reducing the hazard category. This is an important consideration when performing hazard categorization of environmental restoration sites because energy sources available for release of material are generally fewer at an environmental restoration site

  16. Using MODIS-NDVI for the Modeling of Post-Wildfire Vegetation Response as a Function of Environmental Conditions and Pre-Fire Restoration Treatments

    Directory of Open Access Journals (Sweden)

    Grant M. Casady

    2012-03-01

    Full Text Available Post-fire vegetation response is influenced by the interaction of natural and anthropogenic factors such as topography, climate, vegetation type and restoration practices. Previous research has analyzed the relationship of some of these factors to vegetation response, but few have taken into account the effects of pre-fire restoration practices. We selected three wildfires that occurred in Bandelier National Monument (New Mexico, USA between 1999 and 2007 and three adjacent unburned control areas. We used interannual trends in the Normalized Difference Vegetation Index (NDVI time series data derived from the Moderate Resolution Imaging Spectroradiometer (MODIS to assess vegetation response, which we define as the average potential photosynthetic activity through the summer monsoon. Topography, fire severity and restoration treatment were obtained and used to explain post-fire vegetation response. We applied parametric (Multiple Linear Regressions-MLR and non-parametric tests (Classification and Regression Trees-CART to analyze effects of fire severity, terrain and pre-fire restoration treatments (variable used in CART on post-fire vegetation response. MLR results showed strong relationships between vegetation response and environmental factors (p < 0.1, however the explanatory factors changed among treatments. CART results showed that beside fire severity and topography, pre-fire treatments strongly impact post-fire vegetation response. Results for these three fires show that pre-fire restoration conditions along with local environmental factors constitute key processes that modify post-fire vegetation response.

  17. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  18. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  19. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado: Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    Title 1 of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the inactive Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. Title 2 of the UMTRCA authorized the US Nuclear Regulatory Commission (NRC) or agreement state to regulate the operation and eventual reclamation of active uranium processing sites. The uranium mill tailings at the site were removed and reprocessed from 1977 to 1979. The contaminated areas include the former tailings area, the mill yard, the former ore storage area, and adjacent areas that were contaminated by uranium processing activities and wind and water erosion. The Naturita remedial action would result in the loss of 133 acres (ac) of contaminated soils at the processing site. If supplemental standards are approved by the NRC and the state of Colorado, approximately 112 ac of steeply sloped contaminated soils adjacent to the processing site would not be cleaned up. Cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers.

  20. Oak Ridge Reservation site management plan for the environmental restoration program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This report describes the overall approach for addressing environmental contamination on the Oak Ridge Reservation (ORR) National Priorities List site located in east Tennessee. The cleanup strategy reflected in this site management plan (SMP) has been developed to accelerate the transition of areas of concern (AOCs) from characterization to remediation by making decisions at the watershed scale based on recommended land uses. Project scoping involves the use of defined remedial action objectives, which are based in part on the land uses selected for the project sites. To provide a consistent land use approach that accommodates the needs of all stakeholders responsible for the remediation and reutilization of the ORR, a reservation-wide strategy has been developed. The Common Ground process is a stakeholder-driven process to determine preferred land use options for the ORR so that clean-up operations will be based on the most likely and acceptable land uses. DOE utilized the information gathered in the Common Ground process to recommend desired land uses for the ORR. The land uses recommended by DOE as a result of the Common Ground process are being used for planning land and facility use/reuse for the next 25 years. Land uses recommended for the ORR in conducting CERCLA remedial activities are conservation, industrial use, and waste management.

  1. White Oak Creek Embayment site characterization and contaminant screening analysis. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Blaylock, B.G.; Ford, C.J.; Frank, M.L.; Hoffman, F.O.; Hook, L.A.

    1993-01-01

    Analyses of sediment samples collected near the mouth of White Oak Creek during the summer of 1990 revealed {sup 137}Cs concentrations [> 10{sup 6} Bq/kg dry wt (> 10{sup 4} pCi/g dry wt)] near the sediment surface. Available evidence indicates that these relatively high concentrations of {sup 137}Cs now at the sediment surface were released from White Oak Dam in the mid-1950s and had accumulated at depositionalsites in the embayment. These accumulated sediments are being eroded and transported downstream primarily during winter low-water levels by flood events and by a combination of normal downstream flow and the water turbulence created by the release of water from Melton Hill Dam during hydropower generation cycles. This report provides a more thorough characterization of the extent of contamination in WOCE than was previously available. Environmental samples collected from WOCE were analyzed for organic, inorganic, and radiological contaminants in fish, water, and sediment. These results were used to conduct a human health effects screening analysis. Walkover radiation surveys conducted inside the fenced area surrounding the WOCE at summer-pool (741 ft MSL) and at winter-pool (733 ft MSL) level, indicated a maximum exposure rate of 3 mR h{sup 1} 1 m above the soil surface.

  2. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

  3. A Comparison of Space and Ground Based Facility Environmental Effects for FEP Teflon. Revised

    Science.gov (United States)

    Rutledge, Sharon K.; Banks, Bruce A.; Kitral, Michael

    1998-01-01

    Fluorinated Ethylene Propylene (FEP) Teflon is widely used as a thermal control material for spacecraft, however, it is susceptible to erosion, cracking, and subsequent mechanical failure in low Earth orbit. One of the difficulties in determining whether FEP Teflon will survive during a mission is the wide disparity of erosion rates observed for this material in space and in ground based facilities. Each environment contains different levels of atomic oxygen, ions, and vacuum ultraviolet (VUV) radiation in addition to parameters such as the energy of the arriving species and temperature. These variations make it difficult to determine what is causing the observed differences in erosion rates. This paper attempts to narrow down which factors affect the erosion rate of FEP Teflon through attempting to change only one environmental constituent at a time. This was attempted through the use of a single simulation facility (plasma asher) environment with a variety of Faraday cages and VUV transparent windows. Isolating one factor inside of a radio frequency (RF) plasma proved to be very difficult. Two observations could be made. First, it appears that the erosion yield of FEP Teflon with respect to that of polyimide Kapton is not greatly affected by the presence or lack of VUV radiation present in the RF plasma and the relative erosion yield for the FEP Teflon may decrease with increasing fluence. Second, shielding from charged particles appears to lower the relative erosion yield of the FEP to approximately that observed in space, however it is difficult to determine for sure whether ions, electrons, or some other components are causing the enhanced erosion.

  4. Final technology report for D-Area oil seepage basin bioventing optimization test, environmental restoration support

    Energy Technology Data Exchange (ETDEWEB)

    Radway, J.C.; Lombard, K.H.; Hazen, T.C.

    1997-01-24

    One method proposed for the cleanup of the D-Area Oil Seepage Basin was in situ bioremediation (bioventing), involving the introduction of air and gaseous nutrients to stimulate contaminant degradation by naturally occurring microorganisms. To test the feasibility of this approach, a bioventing system was installed at the site for use in optimization testing by the Environmental Biotechnology Section of the Savannah River Technology Center. During the interim action, two horizontal wells for a bioventing remediation system were installed eight feet below average basin grade. Nine piezometers were also installed. In September of 1996, a generator, regenerative blower, gas cylinder station, and associated piping and nutrient injection equipment were installed at the site and testing was begun. After baseline characterization of microbial activity and contaminant degradation at the site was completed, four injection campaigns were carried out. These consisted of (1) air alone, (2) air plus triethylphosphate (TEP), (3) air plus nitrous oxide, and (4) air plus methane. This report describes results of these tests, together with conclusions and recommendations for further remediation of the site. Natural biodegradation rates are high. Oxygen, carbon dioxide, and methane levels in soil gas indicate substantial levels of baseline microbial activity. Oxygen is used by indigenous microbes for biodegradation of organics via respiration and hence is depleted in the soil gas and water from areas with high contamination. Carbon dioxide is elevated in contaminated areas. High concentrations of methane, which is produced by microbes via fermentation once the oxygen has been depleted, are found at the most contaminated areas of this site. Groundwater measurements also indicated that substantial levels of natural contaminant biodegradation occurred prior to air injection.

  5. Technical management plan for sample generation, analysis, and data review for Phase 2 of the Clinch River Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Brandt, C.C.; Benson, S.B. [Oak Ridge National Lab., TN (United States); Beeler, D.A. [Peer Consultants, Inc., Oak Ridge, TN (United States)] [and others

    1994-03-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. The remedial investigation is entering Phase 2, which has the following items as its objectives: define the nature and extent of the contamination in areas downstream from the DOE ORR, evaluate the human health and ecological risks posed by these contaminants, and perform preliminary identification and evaluation of potential remediation alternatives. This plan describes the requirements, responsibilities, and roles of personnel during sampling, analysis, and data review for the Clinch River Environmental Restoration Program (CR-ERP). The purpose of the plan is to formalize the process for obtaining analytical services, tracking sampling and analysis documentation, and assessing the overall quality of the CR-ERP data collection program to ensure that it will provide the necessary building blocks for the program decision-making process.

  6. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  7. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  8. Restoring Detailed Geomagnetic and Environmental Information from Continuous Sediment Paleomagnetic Measurement through Optimised Deconvolution

    Science.gov (United States)

    Xuan, C.; Oda, H.

    2013-12-01

    in UDECON is achieved by searching for the minimum ABIC while shifting the sensor response (to account for possible mispositioning of the sample on the tray) and a smoothness parameter in ranges defined by user. Comparison of deconvolution results using sensor response estimated from integrated point source measurements and other methods suggest that the integrated point source estimate yields better results (smaller ABIC). The noise characteristics of magnetometer measurements and the reliability of the UDECON algorithm were tested using repeated (a total of 400 times) natural remanence measurement of a u-channel sample before and after stepwise alternating field demagnetizations. Using a series of synthetic data constructed based on real paleomagnetic record, we demonstrate that optimized deconvolution using UDECON can greatly help revealing detailed paleomagnetic information such as excursions that may be smoothed out during pass-through measurement. Application of UDECON to the vast amount of existing and future pass-through paleomagnetic and rock magnetic measurements on sediments recovered especially through ocean drilling programs will contribute to our understanding of the geodynamo and paleo-environment by providing more detailed records of geomagnetic and environmental changes.

  9. Strategic Environmental Research and Development Project FY 1994: Assessing national remote sensing technologies for use in US Department of Energy Environmental Restoration Activities, Oak Ridge Solid Waste Storage Area 4 case study

    Energy Technology Data Exchange (ETDEWEB)

    King, A.L.; Smyre, J.L.; Evers, T.K.

    1995-02-01

    During FY 1994, the Oak Ridge Environmental Restoration (ER) Remote Sensing Program teamed with members of the Oak Ridge National Security Program Office (NSPO), the Environmental Research Institute of Michigan (ERIM) under contract to the National Exploitation Laboratory (NEL), the Oak Ridge Waste Area Group 4 (WAG 4) ER Program, and the US Department of Energy (DOE), Offices of Technology Development, Nonproliferation and National Security, and Environmental Restoration, to conduct a test and demonstration of the uses of national remote sensing technologies at DOE hazardous waste sites located in Oak Ridge, Tennessee. Objectives of the Oak Ridge study were to determine if national remote sensing technologies are useful in conducting prescreening, characterization, and/or monitoring activities to expedite the clean-up process at hazardous waste sites and to cut clean-up costs wherever possible. This project was sponsored by the Strategic Environmental Research and Development Project (SERDP).

  10. Development of a zoning-based environmental-ecological-coupled model for lakes to assess lake restoration effect

    Science.gov (United States)

    Xu, Mengjia; Zou, Changxin; Zhao, Yanwei

    2017-04-01

    Environmental/ecological models are widely used for lake management as they provide a means to understand physical, chemical and biological processes in highly complex ecosystems. Most research focused on the development of environmental (water quality) and ecological models, separately. Limited studies were developed to couple the two models, and in these limited coupled models, a lake was regarded as a whole for analysis (i.e., considering the lake to be one well-mixed box), which was appropriate for small-scale lakes and was not sufficient to capture spatial variations within middle-scale or large-scale lakes. This paper seeks to establish a zoning-based environmental-ecological-coupled model for a lake. The Baiyangdian Lake, the largest freshwater lake in Northern China, was adopted as the study case. The coupled lake models including a hydrodynamics and water quality model established by MIKE21 and a compartmental ecological model used STELLA software have been established for middle-sized Baiyangdian Lake to realize the simulation of spatial variations of ecological conditions. On the basis of the flow field distribution results generated by MIKE21 hydrodynamics model, four water area zones were used as an example for compartmental ecological model calibration and validation. The results revealed that the developed coupled lake models can reasonably reflected the changes of the key state variables although there remain some state variables that are not well represented by the model due to the low quality of field monitoring data. Monitoring sites in a compartment may not be representative of the water quality and ecological conditions in the entire compartment even though that is the intention of compartment-based model design. There was only one ecological observation from a single monitoring site for some periods. This single-measurement issue may cause large discrepancies particularly when sampled site is not representative of the whole compartment. The

  11. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-06-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 114 comprises the following corrective action site (CAS) located in Area 25 of the Nevada Test Site: • 25-41-03, EMAD Facility This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 25-41-03. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for CAS 25-41-03. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval. The CAS will be investigated based on the data quality objectives (DQOs) developed on April 30, 2009, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 25-41-03. The following text summarizes the SAFER

  12. Arctic National Wildlife Refuge: Revised Comprehensive Conservation Plan, Final Environmental Impact Statement, Wilderness Review, and Wild and Scenic River Review

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Arctic NWR for the next 15 years. It is a revision of the 1988 plan, and it describes...

  13. Streamlined approach for environmental restoration plan for corrective action unit 430, buried depleted uranium artillery round No. 1, Tonopah test range

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This plan addresses actions necessary for the restoration and closure of Corrective Action Unit (CAU) No. 430, Buried Depleted Uranium (DU) Artillery Round No. 1 (Corrective Action Site No. TA-55-003-0960), a buried and unexploded W-79 Joint Test Assembly (JTA) artillery test projectile with high explosives (HE), at the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Tonopah Test Range (TTR) in south-central Nevada. It describes activities that will occur at the site as well as the steps that will be taken to gather adequate data to obtain a notice of completion from Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented in accordance with the Federal Facility Agreement and Consent Order (FFACO) and the Resource Conservation and Recovery Act (RCRA) Industrial Sites Quality Assurance Project Plan.

  14. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2009-03-31

    This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (1996 [as amended February 2008]). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. {sm_bullet} CAS 01-23-02, Atmospheric Test Site - High Alt{sm_bullet} CAS 02-23-02, Contaminated Areas (2){sm_bullet} CAS 02-23-03, Contaminated Berm{sm_bullet} CAS 02-23-10, Gourd-Amber Contamination Area{sm_bullet} CAS 02-23-11, Sappho Contamination Area{sm_bullet} CAS 02-23-12, Scuttle Contamination Area{sm_bullet} CAS 03-23-24, Seaweed B Contamination Area{sm_bullet} CAS 03-23-27, Adze Contamination Area{sm_bullet} CAS 03-23-28, Manzanas Contamination Area{sm_bullet} CAS 03-23-29, Truchas-Chamisal Contamination Area{sm_bullet} CAS 04-23-02, Atmospheric Test Site T4-a{sm_bullet} CAS 05-23-06, Atmospheric Test Site{sm_bullet} CAS 09-23-06, Mound of Contaminated Soil{sm_bullet} CAS 10-23-04, Atmospheric Test Site M-10{sm_bullet} CAS 18-23-02, U-18d Crater (Sulky) Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107.

  15. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-09-30

    This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (FFACO, 1996 [as amended February 2008]). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (1) CAS 01-23-02, Atmospheric Test Site - High Alt; (2) CAS 02-23-02, Contaminated Areas (2); (3) CAS 02-23-03, Contaminated Berm; (4) CAS 02-23-10, Gourd-Amber Contamination Area; (5) CAS 02-23-11, Sappho Contamination Area; (6) CAS 02-23-12, Scuttle Contamination Area; (7) CAS 03-23-24, Seaweed B Contamination Area; (8) CAS 03-23-27, Adze Contamination Area; (9) CAS 03-23-28, Manzanas Contamination Area; (10) CAS 03-23-29, Truchas-Chamisal Contamination Area; (11) CAS 04-23-02, Atmospheric Test Site T4-a; (12) CAS 05-23-06, Atmospheric Test Site; (13) CAS 09-23-06, Mound of Contaminated Soil; (14) CAS 10-23-04, Atmospheric Test Site M-10; and (15) CAS 18-23-02, U-18d Crater (Sulky). Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107. CAU 107 closure activities will consist of verifying that the current postings required under Title 10 Code of Federal Regulations (CFR) Part 835 are in place and implementing use restrictions (URs) at two sites, CAS 03-23-29 and CAS 18-23-02. The current radiological postings combined with the URs are adequate administrative controls to limit site access and worker dose.

  16. Environmental restoration and waste management: An introduction. Student edition; Restauracion ambiental y administracion de residuos nucleares: Introduccion; Edicion estudiantil

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    For more than 40 years, the United States has produced nuclear weapons. These production activities generated both radioactive and hazardous waste and often contaminated the environment. For many years, the public was unaware of the problem and unable to do anything about it. All of this has changed. In response to recent public outcry, the former Secretary of Energy, Retired Admiral James D. Watkins, established the Office of Environmental Restoration and Waste Management (EM) in November 1989. The creation of EM was the first step toward correcting contamination problems from the past 40 years In this booklet, we at DOE, through the efforts of the students at Oak Hills High School of Cincinnati, Ohio, will introduce you to EM and encourage your involvement in this major program within the Department of Energy. [Espanol] Durante mas de 40 anos, los Estados Unidos fabricaron armamentos nucleares. Esta produccion genero residuos radiactivos y peligrosos y, en muchos casos, contaminaron el medio ambiente. Durante mucho tiempo, el publico norteamericano no tenia conocimiento de este problema y no pudo hacer nada para solucionarlo. Todo esto ha cambiado. Respondiendo a crecientes protestas publicas, el ex Secretario de Energia Almirante James D. Watkins, establecio en noviembre de 1989 la Subsecretaria de Administracion Ambiental. La creacion de esta Subsecretaria fue el primer paso que dio el Departamento de Energia para corregir los problemas de contaminacion ambiental de los ultimos 40 anos. En esta publicacion, los que trabajamos en el Departamento de Energia con la ayuda de los estudiantes de la Escuela Secundaria de Oak Hills, Cincinnati, Ohio, te introduciermos a la administracion ambiental y alentamos tu participacion en este programa de fundamental importancia en el Departamento de Energia.

  17. Addendum to the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 134: Aboveground Storage Tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-09-01

    The following is an addendum to the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 134: Aboveground Storage Tanks, Nevada Test Site, Nevada, DOE/NV--1275, dated May 2008. This addendum expands upon information provided in the May 2008 plan. It provides specific details regarding samples to be collected at Corrective Action Sites 15-01-05 and 29-01-01. It also provides discussion and rationale for establishing the spatial boundaries of Corrective Action Sites.

  18. Regulatory and institutional issues impending cleanup at US Department of Energy sites: Perspectives gained from an office of environmental restoration workshop

    Energy Technology Data Exchange (ETDEWEB)

    Fallon, W E; Gephart, J M; Gephart, R E; Quinn, R D; Stevenson, L A

    1991-05-01

    The US Department of Energy's (DOE) nuclear weapons and energy operations are conducted across a nation-wide industrial complex engaged in a variety of manufacturing, processing, testing, and research and development activities. The overall mission of DOE Office of Environmental Restoration and Waste Management (EM) is to protect workers, the public, and the environment from waste materials generated by past, current, and future DOE activities and to bring the DOE complex into compliance with all applicable laws, regulations, and agreements related to health, safety, and the environment. EM addresses this broad mandate through related and interdependent programs that include corrective actions, waste operations, environmental restoration, and technology development. The EM Office of Environmental Restoration (EM-40) recognizes the importance of implementing a complex-wide process to identify and resolve those issues that may impede progress towards site cleanup. As a first step in this process, FM-40 sponsored an exercise to identify and characterize major regulatory and institutional issues and to formulate integrated action steps towards their resolution. This report is the first product of that exercise. It is intended that the exercise described here will mark the beginning of an ongoing process of issue identification, tracking, and resolution that will benefit cleanup activities across the DOE complex.

  19. U.S. Department of Energy worker health risk evaluation methodology for assessing risks associated with environmental restoration and waste management

    Energy Technology Data Exchange (ETDEWEB)

    Blaylock, B.P.; Legg, J.; Travis, C.C. [Oak Ridge National Lab., TN (United States). Center for Risk Management; Simek, M.A.; Sutherland, J. [Univ. of Tennessee, Knoxville, TN (United States); Scofield, P.A. [Office of Environmental Compliance and Documentation (United States)

    1995-06-01

    This document describes a worker health risk evaluation methodology for assessing risks associated with Environmental Restoration (ER) and Waste Management (WM). The methodology is appropriate for estimating worker risks across the Department of Energy (DOE) Complex at both programmatic and site-specific levels. This document supports the worker health risk methodology used to perform the human health risk assessment portion of the DOE Programmatic Environmental Impact Statement (PEIS) although it has applications beyond the PEIS, such as installation-wide worker risk assessments, screening-level assessments, and site-specific assessments.

  20. Perceptions of environmental change and use of traditional knowledge to plan riparian forest restoration with relocated communities in Alcântara, Eastern Amazon

    Science.gov (United States)

    2014-01-01

    Background Riparian forests provide ecosystem services that are essential for human well-being. The Pepital River is the main water supply for Alcântara (Brazil) and its forests are disappearing. This is affecting water volume and distribution in the region. Promoting forest restoration is imperative. In deprived regions, restoration success depends on the integration of ecology, livelihoods and traditional knowledge (TEK). In this study, an interdisciplinary research framework is proposed to design riparian forest restoration strategies based on ecological data, TEK and social needs. Methods This study takes place in a region presenting a complex history of human relocation and land tenure. Local populations from seven villages were surveyed to document livelihood (including ‘free-listing’ of agricultural crops and homegarden tree species). Additionally, their perceptions toward environmental changes were explored through semi-structured interviews (n = 79). Ethnobotanical information on forest species and their uses were assessed by local-specialists (n = 19). Remnants of conserved forests were surveyed to access ecological information on tree species (three plots of 1,000 m2). Results included descriptive statistics, frequency and Smith’s index of salience of the free-list results. Results The local population depends primarily on slash-and-burn subsistence agriculture to meet their needs. Interviewees showed a strong empirical knowledge about the environmental problems of the river, and of their causes, consequences and potential solutions. Twenty-four tree species (dbh > 10 cm) were found at the reference sites. Tree density averaged 510 individuals per hectare (stdv = 91.6); and 12 species were considered the most abundant (density > 10ind/ha). There was a strong consensus among plant-specialists about the most important trees. The species lists from reference sites and plant-specialists presented an important convergence

  1. Contribution of Chromosomes 1HchS and 6HchS to Fertility Restoration in the Wheat msH1 CMS System under Different Environmental Conditions.

    Directory of Open Access Journals (Sweden)

    Almudena Castillo

    Full Text Available Exploiting hybrid wheat heterosis has been long pursued to increase crop yield, stability and uniformity. Cytoplasmic male sterility (CMS systems based in the nuclear-cytoplasmic incompatible interactions are a classic way for hybrid seed production, but to date, no definitive system is available in wheat. The msH1 CMS system results from the incompatibility between the nuclear genome of wheat and the cytoplasmic genome of the wild barley Hordeum chilense. Fertility restoration of the CMS phenotype was first associated with the disomic addition of the short arm of chromosome 6H from H. chilense. In further studies it was observed that chromosome arm 1HchS was also implicated, and the combination of genes in both chromosome arms restored fertility more efficiently. In this work we aim to dissect the effect of each chromosome in fertility restoration when combined in different genomic backgrounds and under different environmental conditions. We propose a model to explain how restoration behaves in the msH1 system and generate valuable information necessary to develop an efficient system for hybrid wheat production.

  2. Contribution of Chromosomes 1HchS and 6HchS to Fertility Restoration in the Wheat msH1 CMS System under Different Environmental Conditions.

    Science.gov (United States)

    Castillo, Almudena; Rodríguez-Suárez, Cristina; Martín, Azahara C; Pistón, Fernando

    2015-01-01

    Exploiting hybrid wheat heterosis has been long pursued to increase crop yield, stability and uniformity. Cytoplasmic male sterility (CMS) systems based in the nuclear-cytoplasmic incompatible interactions are a classic way for hybrid seed production, but to date, no definitive system is available in wheat. The msH1 CMS system results from the incompatibility between the nuclear genome of wheat and the cytoplasmic genome of the wild barley Hordeum chilense. Fertility restoration of the CMS phenotype was first associated with the disomic addition of the short arm of chromosome 6H from H. chilense. In further studies it was observed that chromosome arm 1HchS was also implicated, and the combination of genes in both chromosome arms restored fertility more efficiently. In this work we aim to dissect the effect of each chromosome in fertility restoration when combined in different genomic backgrounds and under different environmental conditions. We propose a model to explain how restoration behaves in the msH1 system and generate valuable information necessary to develop an efficient system for hybrid wheat production.

  3. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2001-11-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the activities necessary to close Corrective Action Unit (CAU) 398: Area 25 Spill Sites. CAU 398, located in Area 25 of the Nevada Test Site, is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996), and consists of the following 13 Corrective Action Sites (CASs) (Figure 1): (1) CAS 25-44-01 , a fuel spill on soil that covers a concrete pad. The origins and use of the spill material are unknown, but the spill is suspected to be railroad bedding material. (2) CAS 25-44-02, a spill of liquid to the soil from leaking drums. (3) CAS 25-44-03, a spill of oil from two leaking drums onto a concrete pad and surrounding soil. (4) CAS 25-44-04, a spill from two tanks containing sulfuric acid and sodium hydroxide used for a water demineralization process. (5) CAS 25-25-02, a fuel or oil spill from leaking drums that were removed in 1992. (6) CAS 25-25-03, an oil spill adjacent to a tipped-over drum. The source of the drum is not listed, although it is noted that the drum was removed in 1991. (7) CAS 25-25-04, an area on the north side of the Engine-Maintenance, Assembly, and Disassembly (E-MAD) facility, where oils and cooling fluids from metal machining operations were poured directly onto the ground. (8) CAS 25-25-05, an area of oil and/or hydraulic fluid spills beneath the heavy equipment once stored there. (9) CAS 25-25-06, an area of diesel fuel staining beneath two generators that have since been removed. (10) CAS 25-25-07, an area of hydraulic oil spills associated with a tunnel-boring machine abandoned inside X-Tunnel. (11) CAS 25-25-08, an area of hydraulic fluid spills associated with a tunnel-boring machine abandoned inside Y-Tunnel. (12) CAS 25-25-16, a diesel fuel spill from an above-ground storage tank located near Building 3320 at Engine Test Stand-1 (ETS-1) that was removed in 1998. (13) CAS 25-25-17, a hydraulic oil spill

  4. Soil bioengineering measures for disaster mitigation and environmental restoration in Central America: authochtonal cuttings suitability and economic efficiency

    Science.gov (United States)

    Petrone, A.; Preti, F.

    2009-04-01

    The use of Soil Bio-Engineering techniques in Developing countries is a relevant issue for Disaster mitigation, environmental restoration and poverty reduction. Research on authochtonal plants suitable for this kind of works and on economic efficiency is essential for the divulgation of this Discipline. The present paper is focused on this two issues related to the realization of various typologies of Soil Bio-engineering works in the Humid tropic of Nicaragua. In the area of Río Blanco, located in the Department of Matagalpa, Soil bio-engineering installations were built in several sites. The particular structures built were: drainages with live fascine mattress, a live palisade, a vegetated live crib wall for riverbank protection, a vegetative covering made of a metallic net and biotextile coupled with a live palisade made of bamboo. In order to evaluate the suitability of the various plants used in the works, monitorings were performed, one in the live palisade alongside an unpaved road and the other on the live crib wall along a riverbank, collecting survival rate and morphological parameters data. Concerning the economic efficiency we proceed to a financial analysis of the works and once the unit price was obtained, we converted the amount in EPP Dollars (Equal Purchasing Power) in order to compare the Nicaraguan context with the Italian one. Among the used species we found that Madero negro (Gliricidia sepium) and Roble macuelizo (Tabebuia rosea) are adequate for Soil-bioengineering measure on slopes while Helequeme (Erythrina fusca) reported a successful behaviour only in the crib wall for riverbank protection. In the comparison of the costs in Nicaragua and in Italy, the unit price reduction for the central American country ranges between 1.5 times (for the vegetative covering) and almost 4 times (for the fascine mattress) if it's used the EPP dollar exchange rate. Thus, a conclusion can be reached with regard to hydrological-risk mitigating actions

  5. Quality assurance programs developed and implemented by the US Department of Energy`s Analytical Services Program for environmental restoration and waste management activities

    Energy Technology Data Exchange (ETDEWEB)

    Lillian, D.; Bottrell, D. [Dept. of Energy, Germntown, MD (United States)

    1993-12-31

    The U.S. Department of Energy`s (DOE`s) Office of Environmental Restoration and Waste Management (EM) has been tasked with addressing environmental contamination and waste problems facing the Department. A key element of any environmental restoration or waste management program is environmental data. An effective and efficient sampling and analysis program is required to generate credible environmental data. The bases for DOE`s EM Analytical Services Program (ASP) are contained in the charter and commitments in Secretary of Energy Notice SEN-13-89, EM program policies and requirements, and commitments to Congress and the Office of Inspector General (IG). The Congressional commitment by DOE to develop and implement an ASP was in response to concerns raised by the Chairman of the Congressional Environment, Energy, and Natural Resources Subcommittee, and the Chairman of the Congressional Oversight and Investigations Subcommittee of the Committee on Energy and Commerce, regarding the production of analytical data. The development and implementation of an ASP also satisfies the IG`s audit report recommendations on environmental analytical support, including development and implementation of a national strategy for acquisition of quality sampling and analytical services. These recommendations were endorsed in Departmental positions, which further emphasize the importance of the ASP to EM`s programs. In September 1990, EM formed the Laboratory Management Division (LMD) in the Office of Technology Development to provide the programmatic direction needed to establish and operate an EM-wide ASP program. In January 1992, LMD issued the {open_quotes}Analytical Services Program Five-Year Plan.{close_quotes} This document described LMD`s strategy to ensure the production of timely, cost-effective, and credible environmental data. This presentation describes the overall LMD Analytical Services Program and, specifically, the various QA programs.

  6. International Conference on Promotion of the Global Application of Decommissioning and Environmental Restoration Programmes; Conferencia Internacional sobre el Fomento de la Aplicacion global de Programas de Clausura y Restauracion Medioambiental

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-08-01

    The Conference on Promotion of the Global Application of Decommissioning and Environmental Restoration Programmes, organised by the International Atomic Energy Agency (IAEA) with CSN participation, was held in Madrid between May 23rd and 27th. (Author)

  7. 78 FR 15007 - Notice of Open House-Draft Environmental Impact Statement for Revised Water Control Manuals for...

    Science.gov (United States)

    2013-03-08

    ... Revised Water Control Manuals for the Alabama-Coosa-Tallapoosa River Basin AGENCY: Department of the Army... Alabama-Coosa-Tallapoosa River Basin (ACT) Water Control Master Manual (Master Manual). The public comment... CONTACT: Mr. Lewis Sumner at telephone (251) 694-3857. SUPPLEMENTARY INFORMATION: The Master...

  8. Joint Line Reconstruction in Navigated Total Knee Arthroplasty Revision

    Science.gov (United States)

    2012-05-16

    Revision Total Knee Arthroplasty Because of; Loosening; Instability; Impingement; or Other Reasons Accepted as Indications for TKA Exchange.; The Focus is to Determine the Precision of Joint Line Restoration in Navigated vs. Conventional Revision Total Knee Arthroplasty

  9. An archaeological reconnaissance of a 14 mile section of the East Fork Poplar Creek for the Environmental Restoration Project, Anderson and Roane Counties, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    DuVall, G.D. [DuVall and Associates, Inc., Nashville, TN (United States)

    1993-01-01

    At the request of the US Army Corps of Engineers, Nashville District, Nashville, Tennessee, an archaeological reconnaissance of the potential impact areas of the Environmental Restoration Project (ERP) along the East Fork Poplar Creek was conducted during the period December 16, 1991, and March 3, 1992. The reconnaissance was conducted in response to environmental evaluations as a result of the accidental spillage of approximately 293,000 pounds of mercury, radionuclides, heavy metals and other compounds. The reconnaissance to assess adverse impacts to cultural resources located within the boundaries of Federally-licensed, permitted, funded or assisted projects was conducted in compliance with the National Historic Preservation Act of 1966, National Environmental Policy Act of 1969 and Executive Order 11593.

  10. Native plant restoration combats environmental change: development of carbon and nitrogen sequestration capacity using small cordgrass in European salt marshes.

    Science.gov (United States)

    Curado, Guillermo; Rubio-Casal, Alfredo E; Figueroa, Enrique; Grewell, Brenda J; Castillo, Jesús M

    2013-10-01

    Restoration of salt marshes is critical in the context of climate change and eutrophication of coastal waters because their vegetation and sediments may act as carbon and nitrogen sinks. Our primary objectives were to quantify carbon (C) and nitrogen (N) stocks and sequestration rates in restored marshes dominated by Spartina maritima to provide support for restoration and management strategies that may offset negative aspects of eutrophication and climate change in estuarine ecosystems. Sediment C content was between ca. 13 mg C g(-1)and sediment N content was ca. 1.8 mg N g(-1). The highest C content for S. maritima was recorded in leaves and stems (ca. 420 mg C g(-1)) and the lowest in roots (361 ± 4 mg C g(-1)). S. maritima also concentrated more N in its leaves (31 ± 1 mg N g(-1)) than in other organs. C stock in the restored marshes was 29.6 t C ha(-1); ca. 16 % was stored in S. maritima tissues. N stock was 3.6 t N ha(-1), with 8.3 % stored in S. maritima. Our results showed that the S. maritima restored marshes, 2.5 years after planting, were sequestering atmospheric C and, therefore, provide some mitigation for global warming. Stands are also capturing nitrogen and reducing eutrophication. The concentrations of C and N contents in sediments, and cordgrass relative cover of 62 %, and low below-ground biomass (BGB) suggest restored marshes can sequester more C and N. S. maritima plantations in low marshes replace bare sediments and invasive populations of exotic Spartina densiflora and increase the C and N sequestration capacity of the marsh by increasing biomass production and accumulation.

  11. Environmental Regulatory Compliance Plan for Site Characterization; Yucca Mountain Site, Nevada Research and Development Area, Nevada: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    The DOE is committed to conduct its operations in an environmentally safe and sound manner, and will comply with applicable environmental statutes and regulations. These objectives are described in DOE Order 5400.1 (Environmental Protection Program Requirements). This document -- the Environmental Regulatory Compliance Plan (ERCP) -- is one method of implementing the policy set forth in DOE Order 5400.1 and the NWPA. The ERCP describes the plan by which the DOE will comply with applicable Federal environmental statutes and regulations. The ERCP also discusses how DOE will address State and local environmental statutes and regulations. 180 refs., 27 figs., 1 tab.

  12. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  13. Environmental Restoration/Waste Management - applied technology. Semiannual report, July 1992--June 1993, Volume 1, Number 2, and Volume 2, Number 1

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, P.W.; Bruner, J.M.; Price, M.E.; Talaber, C.J. [eds.

    1993-12-31

    The Environmental Restoration/Waste Management-Applied Technology (ER/WM-AT) Program is developing restoration and waste treatment technologies needed for the ongoing environmental cleanup of the Department of Energy (DOE) complex and treatment technologies for wastes generated in the nuclear weapons production complex. These technologies can find application to similar problems nationally and even worldwide. They can be demonstrated at the Livermore site, which mirrors (on a small scale) many of the environmental and waste management problems of the rest of the DOE complex. Their commercialization should speed cleanup, and the scope of the task should make it attractive to US industry. The articles in this semi-annual report cover the following areas: ceramic final forms for residues of mixed waste treatment; treatment of wastes containing sodium nitrate; actinide volatility in thermal oxidation processes; in situ microbial filters for remediating contaminated soils; collaboration with scientists in the former Soviet Union on new ER/WM technologies; and fiber-optic sensors for chlorinated organic solvents.

  14. Environmental Restoration and Waste Management Site-Specific Plan for the Oak Ridge Reservation. [Appendix contains accromyms list and maps of waste management facilities

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance at its waste sites and facilities, while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities, planned and completed, undertaken to implement these FYP goals at the DOE Field Office-Oak Ridge (DOE/OR) installations and programs; specifically, for the Oak Ridge Reservation (ORR), Oak Ridge Associated Universities (ORAU), and Hazardous Waste Remedial Action Program (HAZWRAP). Activities described in this SSP address hazardous, radioactive, mixed, and sanitary wastes, along with treatment, storage, and disposal of current production waste and legacy waste from past operation. The SSP is presented in sections emphasizing Corrective Activities (A), Environmental Restoration (ER), Waste Management (WM), Technology Development (TD), and Transportation; and includes descriptions of activities, resources, and milestones by installation or program. 87 tabs.

  15. Environmental flows and its evaluation of restoration effect based on LEDESS model in Yellow River Delta wetlands

    NARCIS (Netherlands)

    Wang, X.G.; Lian, Y.; Huang, C.; Wang, X.J.; Wang, R.L.; Shan, K.; Pedroli, B.; Eupen, van M.; Elmahdi, A.; Ali, M.

    2012-01-01

    Due to freshwater supplement scarcity and heavy human activities, the fresh water wetland ecosystem in Yellow River Delta is facing disintegrated deterioration, and it is seriously affecting the health of the Yellow River ecosystem. This paper identifies the restoration objectives of wetland aiming

  16. From restoration to adaptation: the changing discourse of invasive species management in coastal New England under global environmental change

    Science.gov (United States)

    Scholars have focused on militaristic metaphors of invasion for more than a decade, but few if any studies look to the on-the-ground language of restoration practitioners to determine how they talk about invasive species. Here we demonstrate the absence of militaristic metaphors ...

  17. From restoration to adaptation: the changing discourse of invasive species management in coastal New England under global environmental change

    Science.gov (United States)

    Scholars have focused on militaristic metaphors of invasion for more than a decade, but few if any studies look to the on-the-ground language of restoration practitioners to determine how they talk about invasive species. Here we demonstrate the absence of militaristic metaphors ...

  18. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 134: Aboveground Storage Tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-05-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 134, Aboveground Storage Tanks. CAU 134 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996; as amended February 2008) and consists of four Corrective Action Sites (CASs) located in Areas 3, 15, and 29 of the Nevada Test Site (NTS) (Figure 1): (1) CAS 03-01-03, Aboveground Storage Tank; (2) CAS 03-01-04, Tank; (3) CAS 15-01-05, Aboveground Storage Tank; and (4) CAS 29-01-01, Hydrocarbon Stain. CAS 03-01-03 consists of a mud tank that is located at the intersection of the 3-07 and the 3-12 Roads in Area 3 of the NTS. The tank and its contents are uncontaminated and will be dispositioned in accordance with applicable federal, state, and local regulations. This CAS will be closed by taking no further action. CAS 03-01-04 consists of a potable water tank that is located at the Core Complex in Area 3 of the NTS. The tank will be closed by taking no further action. CAS 15-01-05 consists of an aboveground storage tank (AST) and associated impacted soil, if any. This CAS is located on a steep slope near the Climax Mine in Area 15 of the NTS. The AST is empty and will be dispositioned in accordance with applicable federal, state, and local regulations. Soil below the AST will be sampled to identify whether it has been impacted by chemicals at concentrations exceeding the action levels. It appears that the tank is not at its original location. Soil will also be sampled at the original tank location, if it can be found. If soil at either location has been impacted at concentrations that exceed the action levels, then the extent of contamination will be identified and a use restriction (UR) will be implemented. The site may be clean closed if contamination is less than one cubic yard in extent and can be readily excavated. If action levels are not exceeded, then no

  19. Lessons learned from US Department of Energy programs on decontamination and demolition, radioactive waste processing and shipping, and environmental restoration of former nuclear technology and production sites

    Energy Technology Data Exchange (ETDEWEB)

    Maloney, M.D. [CH2M Hill Inc., Nuclear Business Group, Englewood, Colorado (United States)

    2006-07-01

    The US Department of Energy has contracted for the cleanup and closure of former weapons sites using turn-key, performance-incentive contracts that comprise the complete range of project management, decontamination and demolition, waste management, and environmental restoration technologies. This paper describes several of the technologies developed and deployed in each of the four technical areas, and also the management strategies and systems employed to integrate the various technologies into the overall cleanup plan. Lessons learned from the approaches taken at the Rocky Flats, Hanford, Mound and Savannah River Sites include contractual, regulatory, and technological aspects of the work. (author)

  20. Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II [IT Corp., (United States); Reneau, M.; Morton, S.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  1. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado: Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  2. Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  3. Revising Translations

    DEFF Research Database (Denmark)

    Rasmussen, Kirsten Wølch; Schjoldager, Anne

    2011-01-01

    out by specialised revisers, but by staff translators, who revise the work of colleagues and freelancers on an ad hoc basis. Corrections are mostly given in a peer-to-peer fashion, though the work of freelancers and inexperienced in-house translators is often revised in an authoritative (nonnegotiable...

  4. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement. Volume 1, Appendix B: Idaho National Engineering Laboratory Spent Nuclear Fuel Management Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The US Department of Energy (DOE) has prepared this report to assist its management in making two decisions. The first decision, which is programmatic, is to determine the management program for DOE spent nuclear fuel. The second decision is on the future direction of environmental restoration, waste management, and spent nuclear fuel management activities at the Idaho National Engineering Laboratory. Volume 1 of the EIS, which supports the programmatic decision, considers the effects of spent nuclear fuel management on the quality of the human and natural environment for planning years 1995 through 2035. DOE has derived the information and analysis results in Volume 1 from several site-specific appendixes. Volume 2 of the EIS, which supports the INEL-specific decision, describes environmental impacts for various environmental restoration, waste management, and spent nuclear fuel management alternatives for planning years 1995 through 2005. This Appendix B to Volume 1 considers the impacts on the INEL environment of the implementation of various DOE-wide spent nuclear fuel management alternatives. The Naval Nuclear Propulsion Program, which is a joint Navy/DOE program, is responsible for spent naval nuclear fuel examination at the INEL. For this appendix, naval fuel that has been examined at the Naval Reactors Facility and turned over to DOE for storage is termed naval-type fuel. This appendix evaluates the management of DOE spent nuclear fuel including naval-type fuel.

  5. Draft Programmatic Environmental Impact Statement for Revision of the Coronado National Forest Land and Resource Management Plan: Cochise, Graham, Pima, Pinal, and Santa Cruz Counties, Arizona; Hidalgo County, New Mexico

    Science.gov (United States)

    Albert Peralta; Andrea Wargo Campbell; Ann Lynch; Cheri Bowen; Christopher Stetson; Craig Wilcox; Daniela Zormeier; Debby Kriegel; Delilah Jaworski; Dustin Walters; Eli Curiel; Erin Boyle; George McKay; Janet Moser; Jennifer Morrissey; Jennifer M. Ruyle; Jeremy Sautter; Judy York; Kenna Schoenle; Larry Jones; Laura White; Linda Peery; Mary Farrell; Mindi Lehew; Mindy Sue Vogel; Nicholas Laluk; Rachael Biggs; Robert Lefevre; Richard Gerhart; Salek Shafiqullah; Sara Dechter; Sarah Davis; Sharon Biedenbender; Tami Emmett; Terry Austin; William Gillespie; Yolynda Begay

    2013-01-01

    The U.S. Department of Agriculture, Forest Service, Coronado National Forest prepared this programmatic environmental impact statement to disclose the potential effects of a proposed action to revise the "Coronado National Forest Land and Resource Management Plan" (1986, as amended). The Coronado comprises 1,783,639 acres, most of which are located in...

  6. Contractor report to the Department of Energy on opportunities for integration of environmental management activities across the complex (predecisional draft). Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The US Department of Energy (DOE) Environmental Management (EM) program faces significant technical and financial challenges in cleaning up the environmental legacy of nuclear weapons production and research and development, while facing an uncertain future in obtaining the needed funding to perform this work. Many of these requirements, including State and Federal regulations and negotiated agreements, continue to be a significant contributor to EM program costs and schedules. Historically, the sites have managed their programs focusing on their individual site`s needs. While this approach maximized successes at individual sites, it has resulted in a more costly program than if more integration across the DOE system occurred. In July 1996, the DOE Assistant Secretary for EM, Al Alm, chartered a contractor led effort to perform complex-wide integration in support of the ten-year plan process to develop a suite of technically defensible, integrated alternatives to meet the EM mission. This report documents opportunities for waste and nuclear materials management integration activities in six areas: transuranic (TRU) waste, mixed low-level waste (MLLW), low-level waste (LLW), environmental restoration (ER), high-level waste (HLW), and spent nuclear fuel (SNF). The opportunities represent technically defensible solutions which reduce cost, accelerate schedules, and result in no significant increase in risk.

  7. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    J. L. Smith

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS).

  8. Static renewal tests using Pimephales promelas (fathead minnows) and Ceriodaphnia dubia (daphnids). Clinch River-Environmental Restoration Program (CR-ERP) study, ambient water toxicity

    Energy Technology Data Exchange (ETDEWEB)

    Russell, C.L.

    1993-12-31

    Clinch River-Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a study during the week of July 22--29, 1993. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected by TVA Field engineering personnel from Clinch River Mile 19.0 and Mile 22.0 on July 21, 23, and 26. Samples were split and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms to these samples resulted in no toxicity (survival, growth, or reproduction) to either species in testing conducted by TVA. Attachments to this report include: Chain of custody forms -- originals; Toxicity test bench sheets and statistical analyses; and Reference toxicant test information.

  9. Static renewal tests using Pimephales promelas (fathead minnows) and Ceriodaphnia dubia (daphnids). Clinch River-Environmental Restoration Program (CR-ERP) pilot study, ambient water toxicity

    Energy Technology Data Exchange (ETDEWEB)

    Simbeck, D.J.

    1993-12-31

    Clinch River-Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a pilot study during the week of April 22--29, 1993, prior to initiation of CR-ERP Phase 2 Sampling and Analysis activities. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected by TVA Field Engineering personnel from Clinch River Mile 9.0 and Poplar Creek Kilometer 1.6 on April 21, 23, and 26. Samples were split and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms to these samples resulted in no toxicity (survival, growth, or reproduction) to either species in testing conducted by TVA. Attachments to this report include: Chain of custody forms -- originals; Toxicity test bench sheets and statistical analyses; Reference toxicant test information; and Personnel training documentation.

  10. Static renewal tests using Pimephales promelas (fathead minnows). Clinch River-Environmental Restoration Program (CR-ERP) study, ambient water toxicity

    Energy Technology Data Exchange (ETDEWEB)

    Simbeck, D.J.

    1993-12-31

    Clinch River-Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a study during the week of October 21--28, 1993. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Due to serious reproduction/embryo abortion problems with the TVA daphnid cultures, TVA conducted tests during this study period using only fathead minnows. Surface water samples were collected by TVA Field Engineering personnel from Poplar Creek Mile 2.9, Mile 4.3, and Mile 5.1 on October 20, 22, and 25. Samples were split and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms to these samples resulted in no toxicity (survival or growth) in testing conducted by TVA. Attachments to this report include: Chain of custody forms -- originals; Toxicity test bench sheets and statistical analyses; and Reference toxicant test information.

  11. Environmental Modeling, The Natural Filter Wetland Priority layers identify priority wetland restoration sites by subwatershed. Land use, hydrology, soil, and landscape characteristics were analyzed to rank opportunities with high nutrient removal potential., Published in 2014, Smaller than 1:100000 scale, Maryland Department of Natural Resources (DNR).

    Data.gov (United States)

    NSGIC Education | GIS Inventory — Environmental Modeling dataset current as of 2014. The Natural Filter Wetland Priority layers identify priority wetland restoration sites by subwatershed. Land use,...

  12. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    Energy Technology Data Exchange (ETDEWEB)

    Survochak, Scott [USDOE Office of Legacy Management, Washington, DC (United States); Daniel, Joe [Navarrao Research and Engineering, Inc., Oak Ridge, TN (United States)

    2017-01-01

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)—trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

  13. The Environmental Scrapbook. A Collection of Articles on Environmental Issues for Use in Secondary Schools. Global Issues Reading Kit #1. Revised.

    Science.gov (United States)

    Gage, Andrew, Ed.; Ockenden, Sandy, Ed.

    This document presents student readings that address a variety of environmental issues. The individual articles present a global perspective that is both alarming and hopeful. Drawing from events and situations in both the northern and southern hemispheres, the articles describe a world in crisis. By critically examining the status quo, the…

  14. Governance and management dynamics of landscape restoration at multiple scales: Learning from successful environmental managers in Sweden.

    Science.gov (United States)

    Dawson, Lucas; Elbakidze, Marine; Angelstam, Per; Gordon, Johanna

    2017-03-14

    Due to a long history of intensive land and water use, habitat networks for biodiversity conservation are generally degraded in Sweden. Landscape restoration (LR) is an important strategy for achieving representative and functional green infrastructures. However, outcomes of LR efforts are poorly studied, particularly the dynamics of LR governance and management. We apply systems thinking methods to a series of LR case studies to analyse the causal structures underlying LR governance and management in Sweden. We show that these structures appear to comprise of an interlinked system of at least three sets of drivers and four core processes. This system exhibits many characteristics of a transformative change towards an integrated, adaptive approach to governance and management. Key challenges for Swedish LR projects relate to institutional and regulatory flexibility, the timely availability of sufficient funds, and the management of learning and knowledge production processes. In response, successful project leaders develop several key strategies to manage complexity and risk, and enhance perceptions of the attractiveness of LR projects.

  15. Screening of contaminants in Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Blaylock, B.G.; Frank, M.L.; Hoffman, F.O.; Hook, L.A.; Suter, G.W.; Watts, J.A.

    1992-09-01

    The purpose of this report is to present the results of a health risk and ecological risk screening analysis for Waste Area Grouping 2 (WAG 2) using available data to identify contaminants and environmental pathways that will require either further investigation or immediate consideration for remediation based on the screening indices. The screening analysis will also identify contaminants that can be assigned a low priority for further investigation and those that require additional data.

  16. Maintaining economic value of ecosystem services whilst reducing environmental cost: a way to achieve freshwater restoration in China.

    Directory of Open Access Journals (Sweden)

    Mingli Lin

    Full Text Available Freshwater fisheries are central to food security in China and this remains one of the most important priorities for the growing human population. Thus, combining ecosystem restoration with economics is pivotal in setting successful conservation in China. Here, we have developed a practical management model that combines fishery improvement with conservation. For six years, a ban on fertilizer and a reduction of planktivorous fish stocking along with the introduction of both mandarin fish Siniperca chuatsi and Chinese mitten crab Eriocheir sinensis was apparent in Wuhu Lake, a highly eutrophic lake located in the middle reaches of the Yangtze River. Annual fish yield decreased slightly after the change in management, whereas fisheries income increased 2.6 times. Mandarin fish and Chinese mitten crab accounted for only 16% of total fisheries production but for 48% of total fisheries income. During this six year period, water clarity increased significantly from 61 cm to 111 cm. Total nitrogen, total phosphorus and chlorophyll decreased significantly from 1.14 to 0.84 mg/L, 0.077 to 0.045 mg/L, and 21.45 to 11.59 μg/L respectively, and macrophyte coverage increased by about 30%. Our results showed that the ecological status of shallow lakes could be rapidly reversed from eutrophic to oligotrophic using simple biomanipulation, whilst maintaining fisheries economic value. It also offers a better approach to shallow fisheries lake management in Asia where traditionally the stocking of Chinese carp and use of fertilizers is still popular.

  17. Environmental, safety, and health plan for the remedial investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This document outlines the environmental, safety, and health (ES&H) approach to be followed for the remedial investigation of Waste Area Grouping (WAG) 10 at Oak at Ridge National Laboratory. This ES&H Plan addresses hazards associated with upcoming Operable Unit 3 field work activities and provides the program elements required to maintain minimal personnel exposures and to reduce the potential for environmental impacts during field operations. The hazards evaluation for WAG 10 is presented in Sect. 3. This section includes the potential radiological, chemical, and physical hazards that may be encountered. Previous sampling results suggest that the primary contaminants of concern will be radiological (cobalt-60, europium-154, americium-241, strontium-90, plutonium-238, plutonium-239, cesium-134, cesium-137, and curium-244). External and internal exposures to radioactive materials will be minimized through engineering controls (e.g., ventilation, containment, isolation) and administrative controls (e.g., procedures, training, postings, protective clothing).

  18. Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Etnier, E.L.; Eaton, L.A. [Oak Ridge National Lab., TN (United States)

    1992-03-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

  19. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 575: Area 15 Miscellaneous Sites, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2014-12-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 575, Area 15 Miscellaneous Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 575 comprises the following four corrective action sites (CASs) located in Area 15 of the Nevada National Security Site: 15-19-02, Waste Burial Pit, 15-30-01, Surface Features at Borehole Sites, 15-64-01, Decontamination Area, 15-99-03, Aggregate Plant This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 575 using the SAFER process. Additional information will be obtained by conducting a field investigation to document and verify the adequacy of existing information, to affirm the predicted corrective action decisions, and to provide sufficient data to implement the corrective actions. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  20. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 538: Spill Sites, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2006-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 538: Spill Sites, Nevada Test Site, Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]). (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk. (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Division of Environmental Protection (NDEP) and where DOE will reach consensus with NDEP before beginning the next phase of work.

  1. Evaluation of various predictive methods for determining OTEC SKSS environmental loads. Revision A, Report No. 79-049-004A

    Energy Technology Data Exchange (ETDEWEB)

    1979-10-31

    The NOAA Office of Engineering is presently managing two contracts for the preliminary design of the OTEC stationkeeping system. Results presented by the contractors thus far (draft report stage in conceptual design) indicate significant differences in the predicted environmental loads. The discrepancies were caused by the use of different prediction methods and variations in the description of the environment. In order to reconcile these discrepancies, a review, comparison, and assessment of the mooring system load prediction methods used by SKSS contractors was presented in Giannotti and Associates, Inc., Report Nos. 78-049-001, 002, and 003. A search for existing model test results and full scale experiments were conducted in an effort to compare results. The present report documents a study on the state of technology for the prediction of environmental loads in general and drift force loads in particular. The outcome of this study should provide: (1) a consistent approach to be taken by SKSS contractors; (2) levels of confidence to be associated with the predicted loads; and (3) a set of recommendations to be used by NOAA to increase confidence in the OTEC SKSS designs and to reduce the risk attributed to those designs. (WHK)

  2. Quality Assurance Project Plan for the Environmental Monitoring Program in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    Waste Area Grouping (WAG) 6 is a hazardous and low-level radioactive waste disposal site at Oak Ridge National Laboratory (ORNL). Extensive site investigations have revealed contaminated surface water, sediments, groundwater, and soils. Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) conducted from 1989--1991 and on recent interactions with the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), a decision was made to defer implementing source control remedial measures at the WAG. The information shows WAG 6 contributes < 2% of the total off-site contaminant risk released over White Oak Dam (WOD). The alternative selected to address hazards at WAG 6 involves maintenance of site access controls to prevent public exposure to on-site contaminants, continued monitoring of contaminant releases to determine if source control measures will be required in the future, and development of technologies to support final remediation of WAG 6. This Quality Assurance Project Plan (QAPjP) has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (DOE/OR/01-1192&D1). Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model. The baseline monitoring phase is expected to begin in 1994 and continue for 12-18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC. The routine annual monitoring phase will continue for {approximately}4 years.

  3. Remote Sensing and GIS Applied to the Landscape for the Environmental Restoration of Urbanizations by Means of 3D Virtual Reconstruction and Visualization (Salamanca, Spain

    Directory of Open Access Journals (Sweden)

    Antonio Miguel Martínez-Graña

    2016-01-01

    Full Text Available The key focus of this paper is to establish a procedure that combines the use of Geographical Information Systems (GIS and remote sensing in order to achieve simulation and modeling of the landscape impact caused by construction. The procedure should be easily and inexpensively developed. With the aid of 3D virtual reconstruction and visualization, this paper proposes that the technologies of remote sensing and GIS can be applied to the landscape for post-urbanization environmental restoration. The goal is to create a rural zone in an urban development sector that integrates the residential areas and local infrastructure into the surrounding natural environment in order to measure the changes to the preliminary urban design. The units of the landscape are determined by means of two cartographic methods: (1 indirect, using the components of the landscape; and (2 direct methods, using the landscape’s elements. The visual basins are calculated for the most transited by the population points, while establishing the zones that present major impacts for the urbanization of their landscape. Based on this, the different construction types are distributed (one-family houses, blocks of houses, etc., selecting the types of plant masses either with ornamentals or integration depending on the zone; integrating water channels, creating a water channel in recirculation and green spaces and leisure time facilities. The techniques of remote sensing and GIS allow for the visualization and modeling of the urbanization in 3D, simulating the virtual reality of the infrastructure as well as the actions that need to be taken for restoration, thereby providing at a low cost an understanding of landscape integration before it takes place.

  4. Restoration of ailing wetlands.

    Directory of Open Access Journals (Sweden)

    Oswald J Schmitz

    2012-01-01

    Full Text Available It is widely held that humankind's destructive tendencies when exploiting natural resources leads to irreparable harm to the environment. Yet, this thinking runs counter to evidence that many ecological systems damaged by severe natural environmental disturbances (e.g., hurricanes can restore themselves via processes of natural recovery. The emerging field of restoration ecology is capitalizing on the natural restorative tendencies of ecological systems to build a science of repairing the harm inflicted by humans on natural environment. Evidence for this, for example, comes from a new meta-analysis of 124 studies that synthesizes recovery of impacted wetlands worldwide. While it may take up to two human generations to see full recovery, there is promise, given human will, to restore many damaged wetlands worldwide.

  5. Data management plan for the Oak Ridge Environmental Information System, Version 1.1. Enviornmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-04

    The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.

  6. Monitoring and evaluation of soil bioengineering interventions for watershed management, disaster mitigation and environmental restoration in Latin America

    Science.gov (United States)

    Petrone, Alessandro; Preti, Federico

    2013-04-01

    In recent decades the institutions responsible for land management and civil protection have showed a great interest in relation to the use of more environmentally friendly techniques to mitigate the risk of landslides and floods. Soil bioengineering has responded to this need and several research groups are carrying out experimentations using the techniques of this discipline in the countries in the developing world. The Deistaf from University of Florence has concentrated its activities in this area over the past decade promoting the use of the techniques of Soil bioengineering in Latin America through the implementation of training and experimentation programmes. Numerous works have been completed both in riverbanks and on slopes in Nicaragua, Guatemala, Ecuador and Colombia. It was decided to make a census of interventions in Latin America from different institutions that may be related to Soil bioengineering in order to obtain an overview of the state of the art in the specific context taking into account also environmental and socio-economic issues. Taking advantage of its network of contacts, DEISTAF has collected dozens of sheets that describe interventions. These sheets describe, among other fields focused on the environment in which the work has been carried out, the materials and techniques used, and the impact of the intervention. In the sheets we present also the monitoring that has been realized for some of these works in the months of October and November 2012; we include the identification of the current condition and functionality of the intervention and, in the case of the presence of some damages, the formulation of instructions to fix them as well as the economic quantification of the repairs to be carried out.

  7. Revising Translations

    DEFF Research Database (Denmark)

    Rasmussen, Kirsten Wølch; Schjoldager, Anne

    2011-01-01

    out by specialised revisers, but by staff translators, who revise the work of colleagues and freelancers on an ad hoc basis. Corrections are mostly given in a peer-to-peer fashion, though the work of freelancers and inexperienced in-house translators is often revised in an authoritative (nonnegotiable......) way. Most respondents and interviewees are worried about increasing pressures on the translation market, which, combined with customers’ general lack of understanding of the translation process, mean that systematic, all-encompassing quality assurance is rarely financially viable....

  8. Revision Notes

    CERN Document Server

    Matthewson, Siobhan; Debbadi, Margaret

    2012-01-01

    Revision Notes: CCEA ICT for GCSE has been written by experienced teachers and examiners so that you can be confident that it covers only the facts and ideas you will be expected to recall and use in the exam. - Essential facts are carefully organised to make revising easier. - Exams tips show you how to avoid losing marks and get the best grade. - Check your understanding questions support you in the run-up to the exams, with answers provided free online at www.hodderplus.co.uk. This book will help you plan and pace your revision to suit your learning needs and can be integrated with other re

  9. Groundwater Quality Sampling and Analysis Plan for Environmental Monitoring Waste Area Grouping 6 at Oak Ridge National Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

  10. Groundwater quality monitoring well installation for Waste Area Grouping at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Mortimore, J.A.; Lee, T.A.

    1994-09-01

    This report documents the drilling and installation of 18 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 11. WAG 11 (White Wing Scrap Yard) is located on the west end of East Fork Ridge between White Wing Road and the Oak Ridge Turnpike. The scrap yard is approximately 25 acres in size. The wells at WAG 11 were drilled and developed between January 1990 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at WAG 11 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. Detailed procedures for well construction were specified by the Engineering Division to ensure that the wells would provide water samples representative of the aquifer. To ensure conformance with the specifications, Energy Systems Construction Engineering and ERCE provided continuous oversight of field activities. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 11. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents.

  11. Ethical Revision.

    Science.gov (United States)

    Jackman, Mary Kathryn

    1994-01-01

    Discusses the dilemma of how to respond to student papers advancing morally repugnant positions. Advocates conceptualizing writing as an ethical act and connecting ethics and revision. Describes briefly how three such student papers were handled. (SR)

  12. Scar revision

    Science.gov (United States)

    ... chap 21. Lorenz P, Bari AS. Scar prevention, treatment, and revision. In: Neligan PC, ed. Plastic Surgery . 3rd ed. Philadelphia, PA: Elsevier; 2013:chap 16. Read More Contracture deformity Keloids Review Date 4/14/2015 Updated ...

  13. Voice restoration

    NARCIS (Netherlands)

    Hilgers, F.J.M.; Balm, A.J.M.; van den Brekel, M.W.M.; Tan, I.B.; Remacle, M.; Eckel, H.E.

    2010-01-01

    Surgical prosthetic voice restoration is the best possible option for patients to regain oral communication after total laryngectomy. It is considered to be the present "gold standard" for voice rehabilitation of laryngectomized individuals. Surgical prosthetic voice restoration, in essence, is alwa

  14. Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017

    Energy Technology Data Exchange (ETDEWEB)

    Surovchak, Scott [USDOE Office of Legacy Management, Washington, DC (United States); Daniel, Joe [Navarro Research and Engineering, Inc., Oak Ridge, TN (United States)

    2017-01-01

    The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at the site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and the Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long-Term Surveillance

  15. Surface water sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of various water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants.

  16. An Evaluation of the Effectiveness of Local Site-Specific Advisory Boards for US Department of Energy Environmental Restoration Programs

    Energy Technology Data Exchange (ETDEWEB)

    Bradbury, J.A.; Branch, K.M.

    1999-03-12

    In the early 1990s, the US Department of Energy (DOE) undertook a major new effort to involve community stakeholders in decisions that would affect them and their communities and interests. An important component of this effort was the establishment of local Site-Specific Advisory Boards (SSABs) at 12 DOE environmental remediation sites. These boards were a formal representation of a change in the way DOE conducts its missions, adding consideration of community concerns and values to the Department's decision-making processes. DOE's purpose in creating the SSAB Initiative was to obtain broadly based, independent, consensus advice and recommendations on issues that have the potential to affect communities surrounding DOE sites, so that it could formulate policies that could be implemented with community consent. Because the boards represented a significant commitment by DOE to change its relationships with community stakeholders, the Department has conducted several assessments of the boards. In 1996 and 1997 a survey was administered to board members and others involved in the work of the boards (DOE/EM 0311, 1996; DOE/EM, 1997). As part of the first survey, DOE and the boards established a set of performance criteria. The surveys provided data that revealed wide variations in board performance and significant change over time. To gain a better understanding of the factors affecting board performance, DOE initiated a more in-depth, qualitative study of nine of the boards across the complex. This study focused on identifying and analyzing the factors affecting board performance and presenting that information in a format that helped the boards and DOE gain insight into their strengths and weaknesses and learn from one another. This report presents the results of this in-depth study. It begins with an overview report that identifies and discusses the six factors that were found to affect board performance. The overview report provides the framework and

  17. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada, Rev. No.: 1

    Energy Technology Data Exchange (ETDEWEB)

    David Strand

    2006-09-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses closure for Corrective Action Unit (CAU) 118, Area 27 Super Kukla Facility, identified in the ''Federal Facility Agreement and Consent Order''. Corrective Action Unit 118 consists of one Corrective Action Site (CAS), 27-41-01, located in Area 27 of the Nevada Test Site. Corrective Action Site 27-41-01 consists of the following four structures: (1) Building 5400A, Reactor High Bay; (2) Building 5400, Reactor Building and access tunnel; (3) Building 5410, Mechanical Building; and (4) Wooden Shed, a.k.a. ''Brock House''. This plan provides the methodology for field activities needed to gather the necessary information for closing the CAS. There is sufficient information and process knowledge from historical documentation and site confirmation data collected in 2005 and 2006 to recommend closure of CAU 118 using the SAFER process. The Data Quality Objective process developed for this CAU identified the following expected closure option: closure in place with use restrictions. This expected closure option was selected based on available information including contaminants of potential concern, future land use, and assumed risks. There are two decisions that need to be answered for closure. Decision I is to determine the nature of contaminants of concern in environmental media or potential source material that could impact human health or the environment. Decision II is to determine whether or not sufficient information has been obtained to confirm that closure objectives were met. This decision includes determining whether the extent of any contamination remaining on site has been defined, and whether actions have been taken to eliminate exposure pathways.

  18. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Lambert, K.A.; Mitchell, M.M. [Brown and Root Environmental, Albuquerque, NM (United States); Jean, D. [MDM/Lamb, Inc., Albuquerque, NM (United States); Brown, C. [Environmental Dimensions, Inc., Albuquerque, NM 87109 (United States); Byrd, C.S. [Sandia National Labs., Albuquerque, NM (United States)

    1997-09-01

    This report describes the survey and removal of radioactive surface contamination at Sandia`s Environmental Restoration (ER) sites. Radiological characterization was performed as a prerequisite to beginning the Resource Conservation and Recovery Act (RCRA) corrective action process. The removal of radioactive surface contamination was performed in order to reduce potential impacts to human health and the environment. The predominant radiological contaminant of concern was depleted uranium (DU). Between October 1993 and November 1996 scanning surface radiation surveys, using gamma scintillometers, were conducted at 65 sites covering approximately 908 acres. A total of 9,518 radiation anomalies were detected at 38 sites. Cleanup activities were conducted between October 1994 and November 1996. A total of 9,122 anomalies were removed and 2,072 waste drums were generated. The majority of anomalies not removed were associated with a site that has subsurface contamination beyond the scope of this project. Verification soil samples (1,008 total samples) were collected from anomalies during cleanup activities and confirm that the soil concentration achieved in the field were far below the target cleanup level of 230 pCi/g of U-238 (the primary constituent of DU) in the soil. Cleanup was completed at 21 sites and no further radiological action is required. Seventeen sites were not completed since cleanup activities wee precluded by ongoing site activity or were beyond the original project scope.

  19. Health and safety plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Cofer, G.H.; Holt, V.L.; Roupe, G.W.

    1993-11-01

    This health and safety plan (HASP) was developed by the members of the Measurement Applications and Development Group of the Health Science Research Division at the Oak Ridge National Laboratory (ORNL). This plan was prepared to ensure that health and safety related items for the Waste Area Grouping (WAG) 2 Remedial Investigation (RI)/Feasibility Study and Site Investigation projects conform with the requirements of 29 CFR 1910.120 (April 18, 1992). The RI Plan calls for the characterization, monitoring, risk assessment, and identification of remedial needs and alternatives that have been structured and staged with short-term and long-term objectives. In early FY 1992, the WAG 2 RI was integrated with the ORNL Environmental Restoration (ER) Site Investigations program in order to achieve the complimentary objectives of the projects more effectively by providing an integrated basis of support. The combined effort was named the WAG 2 Remedial Investigation and Site Investigations Program (WAG 2 RI&SI). The Site Investigation activities are a series of monitoring efforts and directed investigations that support other ER activities by providing information about (1) watershed hydrogeology; (2) contaminants, pathways, and fluxes for groundwater at ORNL; (3) shallow subsurface areas that can act as secondary sources of contaminants; and (4) biological populations and contaminants in biota, in addition to other support and coordination activities.

  20. Static renewal tests using Pimephales promelas (fathead minnows) and Ceriodaphnia dubia (daphnids). Clinch River-Environmental Restoration Program (CR-ERP) study, ambient water toxicity

    Energy Technology Data Exchange (ETDEWEB)

    Simbeck, D.J.

    1994-12-31

    Clinch River-Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a study during the week of January 25--February 1, 1994. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected from Clinch River Mile 9.0, Poplar Creek Mile 1.0, and Poplar Creek Mile 2.9 on January 24, 26, and 28. Samples were partitioned and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms to these samples resulted in no toxicity (survival or growth) to fathead minnows; however, toxicity to daphnids was demonstrated in undiluted samples from Poplar Creek Mile 1.0 in testing conducted by TVA based on hypothesis testing of data. Point estimation (IC{sub 25}) analysis of the data, however, showed no toxicity in PCM 1.0 samples. Attachments to this report include: Chain of custody forms -- originals; Toxicity test bench sheets and statistical analyses; Meter calibrations; and Reference toxicant test information.

  1. Restoring forests

    DEFF Research Database (Denmark)

    Jacobs, Douglass F.; Oliet, Juan A.; Aronson, James

    2015-01-01

    of land requiring restoration implies the need for spatial prioritization of restoration efforts according to cost-benefit analyses that include ecological risks. To design resistant and resilient ecosystems that can adapt to emerging circumstances, an adaptive management approach is needed. Global change......, in particular, imparts a high degree of uncertainty about the future ecological and societal conditions of forest ecosystems to be restored, as well as their desired goods and services. We must also reconsider the suite of species incorporated into restoration with the aim of moving toward more stress resistant...... and competitive combinations in the longer term. Non-native species may serve an important role under some circumstances, e.g., to facilitate reintroduction of native species. Propagation and field establishment techniques must promote survival through seedling stress resistance and site preparation. An improved...

  2. ENVIRONMENTAL ECONOMICS FOR WATERSHED RESTORATION

    Science.gov (United States)

    This book overviews non-market valuation, input-output analysis, cost-benefit analysis, and presents case studies from the Mid Atlantic Highland region, with all but the bare minimum econometrics, statistics, and math excluded or relegated to an appendix. It is a non-market valu...

  3. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 330: Areas 6, 22, and 23 Tanks and Spill Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2001-08-01

    This Streamlined Approach for Environmental restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 330, Areas 6,22, and 23 Tanks and Spill Sites. The CAUs are currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO). This CAU is located at the Nevada Test Site (NTS) (Figure 1). CAU 330 consists of the following Corrective Action Sites (CASs): (1) CAS 06-02-04 - Consists of an underground tank and piping. This CAS is close to an area that was part of the Animal Investigation Program (AIP), conducted under the U.S. Public Health Service. Its purpose was to study and perform tests on the cattle and wild animals in and around the NTS that were exposed to radionuclides. It is unknown if this tank was part of these operations. (2) CAS 22-99-06 - Is a fuel spill that is believed to be a waste oil release which occurred when Camp Desert Rock was an active facility. This CAS was originally identified as being a small depression where liquids were poured onto the ground, located on the west side of Building T-1001. This building has been identified as housing a fire station, radio station, and radio net remote and telephone switchboard. (3) CAS 23-01-02 - Is a large aboveground storage tank (AST) farm that was constructed to provide gasoline and diesel storage in Area 23. The site consists of two ASTs, a concrete foundation, a surrounding earthen berm, associated piping, and unloading stations. (4) CAS 23-25-05 - Consists of an asphalt oil spill/tar release that contains a wash covered with asphalt oil/tar material, a half buried 208-liter (L) (55-gallon [gal]) drum, rebar, and concrete located in the vicinity.

  4. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    A. T. Urbon

    2001-09-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 326, Areas 6 and 27 Release Sites. This CAU is currently listed in the January 2001, Appendix III of the Federal Facilities Agreement and Consent Order (FFACO) (FFACO, 1996). CAU 326 is located on the Nevada Test Site (NTS) and consists of the following four Corrective Action Sites (CASS) (Figure 1): CAS 06-25-01--Is a rupture in an underground pipe that carried heating oil (diesel) from the underground heating oil tank (Tank 6-CP-1) located to the west of Building CP-70 to the boiler in Building CP-1 in the Area 6 Control Point (CP) compound. CAS 06-25-02--A heating oil spill that is a result of overfilling an underground heating oil tank (Tank 6-DAF-5) located at the Area 6 Device Assembly Facility (DAF). CAS 06-25-04--A release of waste oil that occurred while removing used oil to from Tank 6-619-4. Tank 6-619-4 is located northwest of Building 6-619 at the Area 6 Gas Station. CAS 27-25-01--Consists of an excavation that was created in an attempt to remove impacted stained soil from the Site Maintenance Yard in Area 27. Approximately 53.5 cubic meters (m{sup 3}) (70 cubic yards [yd{sup 3}]) of soil impacted by total petroleum hydrocarbons (TPH) and polychlorinated biphenyls (PCBs) was excavated before the excavation activities were halted. The excavation activities were stopped because the volume of impacted soil exceeded estimated quantities and budget.

  5. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Rev. No. 0

    Energy Technology Data Exchange (ETDEWEB)

    Boehlecke, Robert F.

    2006-11-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site (NTS), Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]); (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk; (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Department of Environmental Protection (NDEP), where the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) will reach consensus with the NDEP before beginning the next phase of work. Corrective Action Unit 553 is located in Areas 19 and 20 of the NTS, approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 553 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: 19-99-01, Mud Spill; 19-99-11, Mud Spill; 20-09-09, Mud Spill; and 20-99-03, Mud Spill. There is sufficient

  6. Guidelines for Direct Adhesive Composite Restoration.

    Science.gov (United States)

    Society Of Cariology And Endodontology, Chinese Stomatological Association Csa

    2015-01-01

    Direct adhesive composite restoration, a technique to restore tooth defects by bonding composite resin materials, has been widely used in the restoration of dental caries or other tooth defects. Retention of composite resin restoration mainly relies on bonding strength between the materials and dental tissue. The clinical outcomes rely greatly on the regulated clinical practice of dentists. In 2011, the Society of Cariology and Endodontology of Chinese Stomatological Association (CSA) published the 'Practices and evaluation criteria of composite resin bonded restoration (Discussion Version)'. Since then, opinions and comments regarding the 'Discussion Version' have been widely circulated within the Society. The final version of the guideline was based on systematic reviews of scientific literature and requirements for the edit of technical guidelines, and through several rounds of discussions, revisions and supplements. The society recommends this guideline for clinicians to use in their practices, when conducting direct composite restorations.

  7. ramic restorations

    Directory of Open Access Journals (Sweden)

    Ashish R Jain

    2013-01-01

    Full Text Available Rehabilitation of a patient with severely worn dentition after restoring the vertical dimension is a complex procedure and assessment of the vertical dimension is an important aspect in these cases. This clinical report describes the full mouth rehabilitation of a patient who was clinically monitored to evaluate the adaptation to a removable occlusal splint to restore vertical dimension for a period 1 month and provisional restorations to determine esthetic and functional outcome for a period of 3 months. It is necessary to recognizing that form follows function and that anterior teeth play a vital role in the maintenance of oral health. Confirmation of tolerance to changes in the vertical dimension of occlusion (VDO is of paramount importance. Articulated study casts and a diagnostic wax-up can provide important information for the evaluation of treatment options. Alteration of the VDO should be conservative and should not be changed without careful consideration.

  8. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 177: Mud Pits and Cellars, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2006-06-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses closure for Corrective Action Unit (CAU) 177, Mud Pits and Cellars, identified in the ''Federal Facility Agreement and Consent Order''. Corrective Action Unit 177 consists of the 12 following Corrective Action Sites (CASs) located in Areas 8, 9, 19, and 20 of the Nevada Test Site: (1) 08-23-01, Mud Pit and Cellar; (2) 09-09-41, Unknown No.3 Mud Pit/Disposal Area; (3) 09-09-45, U-9bz PS No.1A Mud Pit (1) and Cellar; (4) 09-23-05, Mud Pit and Cellar; (5) 09-23-08, Mud Pit and Cellar; (6) 09-23-09, U-9itsx20 PS No.1A Cellar; (7) 10-23-02, Mud Pit and Cellar; (8) 10-23-03, Mud Pit and Cellar; (9) 19-23-01, Mud Pit and Cellar; (10) 19-23-02, Cellar and Waste Storage Area; (11) 19-23-03, Cellar with Casing; and (12) 20-23-07, Cellar. This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 177 using the SAFER process. The data quality objective process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the preliminary action levels (PALs), leading to a no further action declaration, or (2) characterization of the nature and extent of contamination, leading to closure in place with use restrictions. The expected closure options were selected based on available information including contaminants of potential concern, future land use, and assumed risks. A decision flow process was developed to outline the collection of data necessary to achieve closure. There are two decisions that need to be answered for closure. Decision I is to determine whether contaminants of potential concern are present in concentrations

  9. Site Restoration

    Energy Technology Data Exchange (ETDEWEB)

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A

    2001-04-01

    The objectives, the programme, and the achievements of the Site Restoration Department of SCK-CEN in 2000 are summarised. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and activities related to the management of decommissioning projects. The department provides consultancy and services to external organisations.

  10. Restorative neuroscience

    DEFF Research Database (Denmark)

    Andres, Robert H; Meyer, Morten; Ducray, Angélique D

    2008-01-01

    There is increasing interest in the search for therapeutic options for diseases and injuries of the central nervous system (CNS), for which currently no effective treatment strategies are available. Replacement of damaged cells and restoration of function can be accomplished by transplantation of...

  11. Maximum entropy signal restoration with linear programming

    Energy Technology Data Exchange (ETDEWEB)

    Mastin, G.A.; Hanson, R.J.

    1988-05-01

    Dantzig's bounded-variable method is used to express the maximum entropy restoration problem as a linear programming problem. This is done by approximating the nonlinear objective function with piecewise linear segments, then bounding the variables as a function of the number of segments used. The use of a linear programming approach allows equality constraints found in the traditional Lagrange multiplier method to be relaxed. A robust revised simplex algorithm is used to implement the restoration. Experimental results from 128- and 512-point signal restorations are presented.

  12. 77 FR 12580 - Public Water System Supervision Program Revision for the State of Colorado

    Science.gov (United States)

    2012-03-01

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Public Water System Supervision Program Revision for the State of Colorado AGENCY: Environmental... the state of Colorado has revised its Public Water System Supervision (PWSS) Program by...

  13. 77 FR 12581 - Public Water System Supervision Program Revision for the State of Montana

    Science.gov (United States)

    2012-03-01

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Public Water System Supervision Program Revision for the State of Montana AGENCY: Environmental... the state of Montana has revised its Public Water System Supervision (PWSS) Program by...

  14. 75 FR 69434 - Public Water System Supervision Program Revision for the State of Montana

    Science.gov (United States)

    2010-11-12

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Public Water System Supervision Program Revision for the State of Montana AGENCY: Environmental... the State of Montana has revised its Public Water System Supervision (PWSS) Primacy Program...

  15. Pollination and Restoration

    National Research Council Canada - National Science Library

    Kingsley W. Dixon

    2009-01-01

    Pollination services underpin sustainability of restored ecosystems. Yet, outside of agri-environments, effective restoration of pollinator services in ecological restoration has received little attention...

  16. Admissible and Restrained Revision

    CERN Document Server

    Booth, R; 10.1613/jair.1874

    2011-01-01

    As partial justification of their framework for iterated belief revision Darwiche and Pearl convincingly argued against Boutiliers natural revision and provided a prototypical revision operator that fits into their scheme. We show that the Darwiche-Pearl arguments lead naturally to the acceptance of a smaller class of operators which we refer to as admissible. Admissible revision ensures that the penultimate input is not ignored completely, thereby eliminating natural revision, but includes the Darwiche-Pearl operator, Nayaks lexicographic revision operator, and a newly introduced operator called restrained revision. We demonstrate that restrained revision is the most conservative of admissible revision operators, effecting as few changes as possible, while lexicographic revision is the least conservative, and point out that restrained revision can also be viewed as a composite operator, consisting of natural revision preceded by an application of a "backwards revision" operator previously studied by Papini. ...

  17. ACL Revision

    Science.gov (United States)

    Costa-Paz, Matias; Dubois, Julieta Puig; Zicaro, Juan Pablo; Rasumoff, Alejandro; Yacuzzi, Carlos

    2017-01-01

    Objectives: The purpose of this study was to evaluate a series of patients one year after an ACL revision with clinical evaluation and MRI, to consider their condition before returning to sports activities. Methods: A descriptive, prospective and longitudinal study was performed. A series of patients who underwent an ACL revision between March 2014 and March 2015 were evaluated after one year post surgery. They were evaluated using the Lysholm score, IKDC, Tegner, artrometry and MRI (3.0 t). A signal pattern and osteointegration was determined in the MRI. Graft signal intensity of the ACL graft using the signal/noise quotient value (SNQ) was also determined to evaluate the ligamentatization process state. Results: A total of 18 male patients were evaluated with a mean age of 31 years old.Average scores were: Lysholm 88 points, IKDC 80 points, Pre-surgical Tegner 9 points and postoperative 4 points. Artrhometry (KT1000) at 20 newtons showed a side to side difference of less than 3 mm in 88%. Only 44% of patients returned to their previous sport activity one year after revision.The MRI showed a heterogeneous signal in neoligaments in 34% of patients. SNQ showed graft integration in only 28%. Synovial fluid was found in bone-graft interphase in 44% of tunnels, inferring partial osteointegration. The heterogeneous signal was present in 50% of patients who did not return to the previous sport level activity. (Fisher statistics: p = 0.043) There were no meaningful differences in patients with auto or allografts. Conclusion: Although the clinical evaluation was satisfactory, only 44% of patients returned to the previous level of sport activity one year after the ACL surgery. The ligamentatization process was found in 28% of knees evaluated with MRI one year later. Partial osteointegration is inferred in 44%. Results showed a meaningful relation between the signal of neoligaments in the MRI and the return to sport activity in said series of patients. MRI is a useful tool

  18. Gallery forest restoration by the attainment of carbon credit: a social-environmental proposal for low-income community; Restauracao de mata ciliar pela viabilizacao de credito de carbono: uma proposta socio-ambiental para comunidade de baixa renda

    Energy Technology Data Exchange (ETDEWEB)

    Coelho, Maria Carolina Crisci

    2007-07-01

    Due to intensification in climate changes by anthropogenic causes, to the recognition of the environmental importance of the Gallery Forest and its intense degradation, this work presents an analysis of the possibilities of carbon credit attainment by low-income community, as part of an incentive program for the restoration of these areas. Two ways are demonstrated: projects of Clean Development Mechanism (CDM), in the scope of the Kyoto Protocol, that generate credits called certified emission reductions; and projects based on voluntary scheme, that generate voluntary emission reductions. Both are difficult to organize and implement. For example: the eligibility of an area, baseline study, monitoring, non-permanence risks of storage carbon, technical and operational structures, operational and business costs, regulated market in consolidation and guarantee of credit acquisition. Nevertheless, this second market presents greater flexibility and acceptance for the forest projects. The social-environmental benefits of these projects are significant and the valuation of their environmental services can revert in financial incentives for low-income community, since that adequately remunerated. The carbon credit can help in the implementation of these projects, contributing for local restoration of the areas and also for carbon capture by the atmosphere, which this is a global subject. (author)

  19. Non-monetary benefit indicators for prioritizing wetlands restoration projects

    Science.gov (United States)

    Ecological restoration of wetlands can reestablish ecosystem services that provide valuable social and environmental benefits. Explicitly characterizing these benefits can help managers better allocate scarce resources among potential restoration projects. Economic valuation stud...

  20. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  1. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  2. Designing regional pattern for ecosystem restoration: A case study

    Institute of Scientific and Technical Information of China (English)

    LI Guoqiang; MA Keming; FU Bojie; LIU Shiling

    2006-01-01

    Designing regional pattern is challenging for ecosystem restoration both in theory and in practice. The present study proposed a new approach to design regional pattern for ecosystem restoration with a case in the arid valley of Upper Minjiang River, SW China. The procedures are: (1) Determine the regional pattern of main environmental factors based on the relationships between the important environmental factors and the main geographical factors generated from DEM data. (2) Overlay the maps of the main environmental factors. (3) Generate a lookup table according to the species selection rule we proposed to link the candidate restoration species to the main environmental factors.(4) Determine the regional pattern of ecosystem restoration by positioning the restoration species in the map of environmental factors according to the lookup table. The regional restoration pattern designed in this way would be applicable not only to restoring a region, but also to predicting the future landscape change.

  3. Site Restoration

    Energy Technology Data Exchange (ETDEWEB)

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A

    2002-04-01

    The objectives, the programme, and the achievements of SCK-CEN's Site Restoration Department for 2001 are described. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and the management of spent fuel and the flow of dismantled materials and the recycling of materials from decommissioning activities based on the smelting of metallic materials in specialised foundries. The department provides consultancy and services to external organisations and performs R and D on new techniques including processes for the treatment of various waste components including the reprocessing of spent fuel, the treatment of tritium, the treatment of liquid alkali metals into cabonates through oxidation, the treatment of radioactive organic waste and the reconditioning of bituminised waste products.

  4. 77 FR 54818 - Polychlorinated Biphenyls (PCBs): Revisions to Manifesting Regulations

    Science.gov (United States)

    2012-09-06

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 761 RIN 2050-AG71 Polychlorinated Biphenyls (PCBs): Revisions to Manifesting Regulations AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY:...

  5. 77 FR 54863 - Polychlorinated Biphenyls (PCBs): Revisions to Manifesting Regulations

    Science.gov (United States)

    2012-09-06

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 761 ] RIN 2050-AG71 Polychlorinated Biphenyls (PCBs): Revisions to Manifesting... CFR Part 761 Environmental protection, Hazardous substances, Manifest, Polychlorinated...

  6. Compensatory Restoration

    Institute of Scientific and Technical Information of China (English)

    Li Li

    2013-01-01

    China needs to reward local environmental protection efforts East China's Anhui Province received 4 million yuan ($635,000) recently as compensation for river pollution found to have originated from neighboring Henan Province more than three months ago. In mid-January, polluted water spread from

  7. Plan-Belief Revision in Jason

    DEFF Research Database (Denmark)

    Jensen, Andreas Schmidt; Villadsen, Jørgen

    2015-01-01

    When information is shared between agents of unknown reliability, it is possible that their belief bases become inconsistent. In such cases, the belief base must be revised to restore consistency, so that the agent is able to reason. In some cases the inconsistent information may be due to use of...... of incorrect plans. We extend work by Alechina et al. to revise belief bases in which plans can be dynamically added and removed. We present an implementation of the algorithm in the AgentSpeak implementation Jason....

  8. Deconvolution of continuous paleomagnetic data from pass-through magnetometer: A new algorithm to restore geomagnetic and environmental information based on realistic optimization

    Science.gov (United States)

    Oda, Hirokuni; Xuan, Chuang

    2014-10-01

    development of pass-through superconducting rock magnetometers (SRM) has greatly promoted collection of paleomagnetic data from continuous long-core samples. The output of pass-through measurement is smoothed and distorted due to convolution of magnetization with the magnetometer sensor response. Although several studies could restore high-resolution paleomagnetic signal through deconvolution of pass-through measurement, difficulties in accurately measuring the magnetometer sensor response have hindered the application of deconvolution. We acquired reliable sensor response of an SRM at the Oregon State University based on repeated measurements of a precisely fabricated magnetic point source. In addition, we present an improved deconvolution algorithm based on Akaike's Bayesian Information Criterion (ABIC) minimization, incorporating new parameters to account for errors in sample measurement position and length. The new algorithm was tested using synthetic data constructed by convolving "true" paleomagnetic signal containing an "excursion" with the sensor response. Realistic noise was added to the synthetic measurement using Monte Carlo method based on measurement noise distribution acquired from 200 repeated measurements of a u-channel sample. Deconvolution of 1000 synthetic measurements with realistic noise closely resembles the "true" magnetization, and successfully restored fine-scale magnetization variations including the "excursion." Our analyses show that inaccuracy in sample measurement position and length significantly affects deconvolution estimation, and can be resolved using the new deconvolution algorithm. Optimized deconvolution of 20 repeated measurements of a u-channel sample yielded highly consistent deconvolution results and estimates of error in sample measurement position and length, demonstrating the reliability of the new deconvolution algorithm for real pass-through measurements.

  9. Developmental variations in environmental influences including endocrine disruptors on pubertal timing and neuroendocrine control: Revision of human observations and mechanistic insight from rodents.

    Science.gov (United States)

    Parent, Anne-Simone; Franssen, Delphine; Fudvoye, Julie; Gérard, Arlette; Bourguignon, Jean-Pierre

    2015-07-01

    Puberty presents remarkable individual differences in timing reaching over 5 years in humans. We put emphasis on the two edges of the age distribution of pubertal signs in humans and point to an extended distribution towards earliness for initial pubertal stages and towards lateness for final pubertal stages. Such distortion of distribution is a recent phenomenon. This suggests changing environmental influences including the possible role of nutrition, stress and endocrine disruptors. Our ability to assess neuroendocrine effects and mechanisms is very limited in humans. Using the rodent as a model, we examine the impact of environmental factors on the individual variations in pubertal timing and the possible underlying mechanisms. The capacity of environmental factors to shape functioning of the neuroendocrine system is thought to be maximal during fetal and early postnatal life and possibly less important when approaching the time of onset of puberty.

  10. Alternatives evaluation for the decontamination and decommissioning of buildings 3506 and 3515 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    this is an alternative evaluation document that records the evaluation process and justification for choosing the alternative recommended for the decontamination and decommissioning (D&D) of the 3506 and 3515 buildings at the Oak Ridge National Laboratory (ORNL). The alternatives for the D&D of the two buildings were: (1) no action (continued surveillance and maintenance), (2) decontamination for free release, (3) entombment in place, (4) partial dismantlement, and (5) complete dismantlement. Soil remediation is not included in any of the alternatives. The recommended alternative for the D&D of Building 3506 is partial dismantlement at an estimated cost of $936, 000 in escalated dollars. The cost estimate for complete dismantlement is $1,384,000. The recommended alternative for the D&D of Building 3515 is complete dismantlement at an estimated cost of $3,733,000 in escalated dollars. This alternative is recommended, because the soils below the foundation of the 3515 building are highly contaminated, and removing the foundation in the D&D project results in lower overall worker risk, costs, and improved post-D&D site conditions. A further recommendation is to revise these cost estimates after the conclusion of the ongoing characterization study. The results of the characterization of the two buildings is expected to change some of the assumptions and resolve some of the uncertainties in the development of these estimates.

  11. 76 FR 67396 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2011-11-01

    ...). These revisions concern oxides of nitrogen (NO X ) emissions from industrial, institutional and... Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and...

  12. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-08-29

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... permitting rules submitted by California as a revision to the Sacramento Metropolitan Air Quality Management...

  13. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... by California as a revision to the Sacramento Metropolitan Air Quality Management District (SMAQMD or...

  14. 78 FR 29096 - Approval and Promulgation of Implementation Plans; Tennessee; Transportation Conformity Revisions

    Science.gov (United States)

    2013-05-17

    ... Conformity Revisions AGENCY: Environmental Protection Agency. ACTION: Proposed rule. SUMMARY: EPA is... Control Division, on July 12, 2012. This revision consists of updates to transportation conformity...-related control and mitigation measures. The intended effect is to update the transportation...

  15. ENVIRONMENTAL FLOW REQUIREMENTS BY MAJOR FISHES IN THE LOWER REACH OF THE YELLOW RIVER DETERMINED BY FLOW RESTORATION%基于流量恢复法的黄河下游鱼类生态需水研究

    Institute of Scientific and Technical Information of China (English)

    蒋晓辉; Angela Arthington; 刘昌明

    2009-01-01

    运用流量恢复(the flow restoration methodology)方法研究黄河下游鱼类生态需水,其基本思路是:首先获得所保护鱼类生态习性相关的流量信息,包括水深、流速、水量等.然后建立概念性模型,确定鱼类和特定流量组分之间的联系.在此基础上,确定流量目标,每一个流量目标被赋予一些水力指标,作为获得满足这个目标的环境流量计算的依据.运用水文学、水力学模型确定满足这些流量目标需要的水流条件,包括数量、持续时间、频率和发生时间,给出满足鱼类生长需要的生态流量.最后给出不同水资源管理情景下可接受的鱼类生态需水.%The Yellow River in China is environmentally degraded severely as a result of anthropogenic changes, most notably the regulation and extraction of surface water resources for irrigated agriculture. Environmental problems include decline of native fish, reduction in total area of riverine wetlands, water quality degradation. There is a growing awareness and understanding for the need to allocate water along a river to maintain ecological processes that provide goods and services. The government is committed to improving the environment on the Yellow River, and to ensure river health. In this paper, flow restoration method was used to calculate environmental flow for fish in the lower Yellow River. Firstly, flow-related information on selected fish in the lower Yellow River was obtained, including fish species composition, abundance and habitat use in relation to flow conditions. Then a model linking selected fish to key aspects of the flow regime was developed. This model provides a means for communicating important linkages between fish and specific flow related processes that must be maintained in order to protect those fish. Thirdly, the environmental flow objectives were identified. Fourthly, hydraulic and hydrologic models were used to determine the magnitude, duration, frequency and

  16. NATURAL REGENERATION STRATUM AS AN INDICATOR OF RESTORATION IN AREA OF ENVIRONMENTAL COMPENSATION FOR MINING LIMESTONE, MUNICIPALITY OF BARROSO, MG, BRAZIL

    Directory of Open Access Journals (Sweden)

    Wanuza Helena Campos

    2016-04-01

    Full Text Available ABSTRACT This study was conducted in a forest under restoration process, which belongs to the company Holcim Brasil S/A, in the municipality of Barroso, state of Minas Gerais (21º00'to 22º00'S and 43º00' to 44º00'W, where 40 plots (2 x 2 m were set, spaced at 10 m, forming eight strata parallel to the watercourse present in the area. Floristic composition and natural regeneration stratum were characterized, and the formed strata allowed evaluating whether the riparian vegetation and watercourse influence on the local regeneration. It was found 162 individuals of 13 families, 18 genera and 22 species, and 10,125 individuals/ha were estimated. Successional classes from pioneer and early secondary and zoochory dispersion syndrome prevailed among species and individuals. The watercourse and riparian vegetation did not exercise significant influence (p> 0.05 on the number of species and regenerating individuals among the different strata of the forest. The diversity index of Shannon-Wiener (H' and equability of Pielou (J' were 2.691 and 0.870, respectively. The species Psidium guajava and Myrtaceae families presented the highest VI (value of importance. Natural regeneration analysis showed the low floristic diversity in the area, suggesting that corrective management actions should be adopted.

  17. Source evaluation report phase 2 investigation: Limited field investigation. Final report: United States Air Force Environmental Restoration Program, Eielson Air Force Base, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This report describes the limited field investigation work done to address issues and answer unresolved questions regarding a collection of potential contaminant sources at Eielson Air Force Base (AFB), near Fairbanks, Alaska. These sources were listed in the Eielson AFB Federal Facility Agreement supporting the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of the base. The limited field investigation began in 1993 to resolve all remaining technical issues and provide the data and analysis required to evaluate the environmental hazard associated with these sites. The objective of the limited field investigation was to allow the remedial project managers to sort each site into one of three categories: requiring remedial investigation/feasibility study, requiring interim removal action, or requiring no further remedial action.

  18. RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2, Sections 4 through 9: Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This report presents compiled information concerning a facility investigation of waste area group 6(WAG-6), of the solid waste management units (SWMU`s) at Oak Ridge National Laboratory (ORNL). The WAG is a shallow ground disposal area for low-level radioactive wastes and chemical wastes. The report contains information on hydrogeological data, contaminant characterization, radionuclide concentrations, risk assessment and baseline human health evaluation including a toxicity assessment, and a baseline environmental evaluation.

  19. Loosening After Acetabular Revision

    DEFF Research Database (Denmark)

    Beckmann, Nicholas A.; Weiss, Stefan; Klotz, Matthias C.M.;

    2014-01-01

    The best method of revision acetabular arthroplasty remains unclear. Consequently, we reviewed the literature on the treatment of revision acetabular arthroplasty using revision rings (1541 cases; mean follow-up (FU) 5.7 years) and Trabecular Metal, or TM, implants (1959 cases; mean FU 3.7 years)...

  20. Restoration of natural capital: a key strategy on the path to sustainability

    NARCIS (Netherlands)

    Blignaut, J.N.; Aronson, J.; Groot, de R.S.

    2014-01-01

    Three intertwining braids or strategies to enable transition towards sustainability can be identified, namely: (i) appropriate sustainable technologies, (ii) revising behaviour including reproduction and consumption patterns, and (iii) investment in the restoration of natural capital (RNC). Less exp

  1. Study on the Ecological Restoration Project of Dalian Lake

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Choosing Dalian Lake as study area to implement ecological restoration project,the existing environmental problems in Dalian Lake were analyzed firstly,and then the project area in Dalian Lake was divided into wetland restoration and reconstruction area,forest wetland cultivation area and shallow wetland restoration and diversity conservation area,finally corresponding restoration measures were put forward according to various function areas,so as to improve the economic output of wetland and operability an...

  2. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1, Appendix C, Savannah River Site Spent Nuclear Fuel Mangement Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The US Department of Energy (DOE) is engaged in two related decision making processes concerning: (1) the transportation, receipt, processing, and storage of spent nuclear fuel (SNF) at the DOE Idaho National Engineering Laboratory (INEL) which will focus on the next 10 years; and (2) programmatic decisions on future spent nuclear fuel management which will emphasize the next 40 years. DOE is analyzing the environmental consequences of these spent nuclear fuel management actions in this two-volume Environmental Impact Statement (EIS). Volume 1 supports broad programmatic decisions that will have applicability across the DOE complex and describes in detail the purpose and need for this DOE action. Volume 2 is specific to actions at the INEL. This document, which limits its discussion to the Savannah River Site (SRS) spent nuclear fuel management program, supports Volume 1 of the EIS. Following the introduction, Chapter 2 contains background information related to the SRS and the framework of environmental regulations pertinent to spent nuclear fuel management. Chapter 3 identifies spent nuclear fuel management alternatives that DOE could implement at the SRS, and summarizes their potential environmental consequences. Chapter 4 describes the existing environmental resources of the SRS that spent nuclear fuel activities could affect. Chapter 5 analyzes in detail the environmental consequences of each spent nuclear fuel management alternative and describes cumulative impacts. The chapter also contains information on unavoidable adverse impacts, commitment of resources, short-term use of the environment and mitigation measures.

  3. Postconstruction report of the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Oakley, L.B.; Siberell, J.K.; Voskuil, T.L.

    1993-06-01

    Remedial actions conducted under the auspices of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) were completed at the Y-12 United Nuclear Corporation (UNC) Disposal Site in August 1992. The purpose of this Postconstruction Report is to summarize numerous technical reports and provide CERCLA documentation for completion of the remedial actions. Other CERCLA reports, such as the Feasibility Study for the UNC Disposal Site, provide documentation leading up to the remedial action decision. The remedial action chosen, placement of a modified RCRA cap, was completed successfully, and performance standards were either met or exceeded. This remedial action provided solutions to two environmentally contaminated areas and achieved the goal of minimizing the potential for contamination of the shallow groundwater downgradient of the site, thereby providing protection of human health and the environment. Surveillance and maintenance of the cap will be accomplished to ensure cap integrity, and groundwater monitoring downgradient of the site will continue to confirm the acceptability of the remedial action chosen.

  4. 76 FR 45780 - Notice of Availability for a Finding of No Significant Impact and Environmental Assessment for...

    Science.gov (United States)

    2011-08-01

    ... Significant Impact and Environmental Assessment for Emergency Restoration of Seagrass Impacts From the... Administrative Trustee (LAT) for this emergency seagrass restoration. Under the National Environmental Policy Act, an Environmental Assessment for Emergency Restoration of Seagrass Impacts from the Deepwater...

  5. 75 FR 16833 - Preliminary Revised 5-Year Outer Continental Shelf (OCS) Oil and Gas Leasing Program for 2007-2012

    Science.gov (United States)

    2010-04-02

    ... Minerals Management Service Preliminary Revised 5-Year Outer Continental Shelf (OCS) Oil and Gas Leasing... Revised 5-Year OCS Oil and Gas Leasing Program for 2007- 2012. This is the Preliminary Revised Program... relative environmental sensitivity analysis and the Secretary's revisions to the leasing schedule...

  6. Environmental impact data for fuels. Part 2: Background information and technical appendix (New revised edition); Miljoefaktabok foer braenslen. Del 2: Bakgrundsinformation och Teknisk bilaga (Ny reviderad upplaga)

    Energy Technology Data Exchange (ETDEWEB)

    Uppenberg, S.; Almemark, M.; Brandel, M.; Lindfors, L.G.; Marcus, H.O.; Stripple, H.; Wachtmeister, A.; Zetterberg, L.

    2001-05-01

    This report is a compilation of data concerning environmental impacts from the utilization of different fuels. The entire life cycle is studied, from the extraction of raw materials to combustion. The fuels under study are gasoline, gasoline with MTBE, diesel, fuel oil, LPG, coal, natural gas, peat, refuse, ethanol, RME, DME, methane and wood fuels (forestry residues, Salix, pellets/briquettes). Utilization areas studied are heating plants, cogeneration plants, power plants, domestic boilers, and light and heavy vehicles. In this new edition, the following changes were made: New life cycle analyses have been included, a few new fuels added, electricity from hydroelectric plants, wind power plants and nuclear power plants have been included and some other minor changes.

  7. Quality Assurance Plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Atwood, G.P.; Miller, D.E. [Automated Sciences Group, Inc., Oak Ridge, TN (United States)

    1992-12-01

    The Oak Ridge National Laboratory (ORNL) Waste Area Grouping (WAG) 2 Site Investigation (SI)includes the lower portion of the White Oak Creek (WOC) drainage and enbayment, and associated floodplain and subsurface environment. The ORNL main plant and the major waste storage and disposal facilities at ORNL are located in the WOC watershed and are drained by the WOC system to the Clinch River, located off-site. Environmental media are contaminated and continue to receive contaminants from hydrologically upgradient WAGS. WAG 2 is important as a conduit from upgradient areas to the Clinch River. The general objectives of the WAG 2 SI Project are to conduct a multimedia monitoring and characterization program to define and monitor the input of contaminants from adjacent WAGS, monitor and gather sufficient information for processes controlling or driving contaminant fluxes to construct an appropriate conceptual model for WAG 2, and prepare for the eventual remediation of WAG 2.

  8. 77 FR 57074 - Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for Fiscal...

    Science.gov (United States)

    2012-09-17

    ... resolved matters for the purpose of applying the revised rates in this policy for these fiscal years. For..., costs will be recalculated using the revised rates in this policy for these fiscal years. Where a..., and Restoration Program for Fiscal Year 2011 AGENCY: National Oceanic and Atmospheric Administration...

  9. (Environmental technology)

    Energy Technology Data Exchange (ETDEWEB)

    Boston, H.L.

    1990-10-12

    The traveler participated in a conference on environmental technology in Paris, sponsored by the US Embassy-Paris, US Environmental Protection Agency (EPA), the French Environmental Ministry, and others. The traveler sat on a panel for environmental aspects of energy technology and made a presentation on the potential contributions of Oak Ridge National Laboratory (ORNL) to a planned French-American Environmental Technologies Institute in Chattanooga, Tennessee, and Evry, France. This institute would provide opportunities for international cooperation on environmental issues and technology transfer related to environmental protection, monitoring, and restoration at US Department of Energy (DOE) facilities. The traveler also attended the Fourth International Conference on Environmental Contamination in Barcelona. Conference topics included environmental chemistry, land disposal of wastes, treatment of toxic wastes, micropollutants, trace organics, artificial radionuclides in the environment, and the use biomonitoring and biosystems for environmental assessment. The traveler presented a paper on The Fate of Radionuclides in Sewage Sludge Applied to Land.'' Those findings corresponded well with results from studies addressing the fate of fallout radionuclides from the Chernobyl nuclear accident. There was an exchange of new information on a number of topics of interest to DOE waste management and environmental restoration needs.

  10. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1, Appendix D, Part B: Naval spent nuclear fuel management

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This volume contains the following attachments: transportation of Naval spent nuclear fuel; description of Naval spent nuclear receipt and handling at the Expended Core Facility at the Idaho National Engineering Laboratory; comparison of storage in new water pools versus dry container storage; description of storage of Naval spent nuclear fuel at servicing locations; description of receipt, handling, and examination of Naval spent nuclear fuel at alternate DOE facilities; analysis of normal operations and accident conditions; and comparison of the Naval spent nuclear fuel storage environmental assessment and this environmental impact statement.

  11. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs, Draft Environmental Impact Statement. Volume 1, Appendix D: Part A, Naval Spent Nuclear Fuel Management

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    Volume 1 to the Department of Energy`s Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Management Programs Environmental Impact Statement evaluates a range of alternatives for managing naval spent nuclear fuel expected to be removed from US Navy nuclear-powered vessels and prototype reactors through the year 2035. The Environmental Impact Statement (EIS) considers a range of alternatives for examining and storing naval spent nuclear fuel, including alternatives that terminate examination and involve storage close to the refueling or defueling site. The EIS covers the potential environmental impacts of each alternative, as well as cost impacts and impacts to the Naval Nuclear Propulsion Program mission. This Appendix covers aspects of the alternatives that involve managing naval spent nuclear fuel at four naval shipyards and the Naval Nuclear Propulsion Program Kesselring Site in West Milton, New York. This Appendix also covers the impacts of alternatives that involve examining naval spent nuclear fuel at the Expended Core Facility in Idaho and the potential impacts of constructing and operating an inspection facility at any of the Department of Energy (DOE) facilities considered in the EIS. This Appendix also considers the impacts of the alternative involving limited spent nuclear fuel examinations at Puget Sound Naval Shipyard. This Appendix does not address the impacts associated with storing naval spent nuclear fuel after it has been inspected and transferred to DOE facilities. These impacts are addressed in separate appendices for each DOE site.

  12. Waste Management Plan for the Remedial Investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This Waste Management Plan (WMP) supplements the Remedial Investigation/Feasibility Study (RI/FS) Project WMP and defines the criteria and methods to be used for managing and characterizing waste generated during activities associated with the RI of 23 wells near the Old Hydrofracture Facility (OHF). These wells are within the Waste Area Grouping (WAG) 5 area of contamination (AOC) at Oak Ridge National Laboratory (ORNL). Field activities for the limited RI of Operable Unit (OU) 3 of WAG 10 will involve sampling and measurement of various environmental media (e.g., liquids and gases). Many of these activities will occur in areas known to be contaminated with radioactive materials or hazardous chemical substances, and it is anticipated that contaminated solid and liquid wastes and noncontaminated wastes will be generated as a result of these activities. On a project-wide basis, handling of these waste materials will be accomplished in accordance with the RI/FS Project WMP and the procedures referenced throughout the plan.

  13. Preliminary report on the ecological assessment of Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Ashwood, T.L.; Suter, G.W. II; Stewart, A.J.

    1992-09-01

    In support of the remedial investigation for Waste Area Grouping (WAG) 5, staff of the Environmental Sciences Division of Oak Ridge National Laboratory have conducted preliminary ecological assessment activities. A screening level ecological risk assessment has been completed, ambient toxicity tests have been conducted on streams and seeps within WAG 5, WAG 5 has been surveyed for rare and endangered species and wetlands, and wild turkeys that may feed on contaminated vegetation and insects in WAG 5 have been screened for beta-emitting isotopes and {sup 137}Cs. The screening-level ecological risk assessment identified some data gaps that were addressed in the ecological assessment plan. These include gaps in data on the toxicity of surface water and soil within WAG 5 and on the status of rare and endangered species. In addition, the screening-level risk assessment identified the need for data on the level of contaminants in wild turkeys that may be consumed by predatory wildlife and humans. Three rounds of ambient toxicity tests on six streams and seeps, using the microcrustacean Ceriodaphnia, have identified potential toxicity in three of the sample sites. Further tests are required to identify the toxicant. No rare or endangered animal species have been identified in the WAG 5 area.

  14. Teatro zandonai in Rovereto, Italy: a case study for restoration

    DEFF Research Database (Denmark)

    Pompoli, Roberto; Prodi, Nicola; Ortega, Irene

    2015-01-01

    Early in 2002 the Municipality of Rovereto, North Italy, planned the theatre restoration works, which were ended in success by reopening of the theatre on October 18th 2014 with the 9th Beethoven Symphony. The most important interventions regarded the raising of the stage tower by 5 m, the revision...

  15. Restorative dentistry for children.

    Science.gov (United States)

    Donly, Kevin J

    2013-01-01

    This article discusses contemporary pediatric restorative dentistry. Indications and contraindications for the choice of different restorative materials in different clinical situations, including the risk assessment of the patient, are presented. The specific use of glass ionomer cement or resin-modified glass ionomer cement, resin-based composite, and stainless steel crowns is discussed so that preparation design and restoration placement is understood.

  16. Global Ecosystem Restoration Index

    DEFF Research Database (Denmark)

    Fernandez, Miguel; Garcia, Monica; Fernandez, Nestor

    2015-01-01

    The Global ecosystem restoration index (GERI) is a composite index that integrates structural and functional aspects of the ecosystem restoration process. These elements are evaluated through a window that looks into a baseline for degraded ecosystems with the objective to assess restoration...

  17. Linking restoration ecology with coastal dune restoration

    Science.gov (United States)

    Lithgow, D.; Martínez, M. L.; Gallego-Fernández, J. B.; Hesp, P. A.; Flores, P.; Gachuz, S.; Rodríguez-Revelo, N.; Jiménez-Orocio, O.; Mendoza-González, G.; Álvarez-Molina, L. L.

    2013-10-01

    Restoration and preservation of coastal dunes is urgently needed because of the increasingly rapid loss and degradation of these ecosystems because of many human activities. These activities alter natural processes and coastal dynamics, eliminate topographic variability, fragment, degrade or eliminate habitats, reduce diversity and threaten endemic species. The actions of coastal dune restoration that are already taking place span contrasting activities that range from revegetating and stabilizing the mobile substrate, to removing plant cover and increasing substrate mobility. Our goal was to review how the relative progress of the actions of coastal dune restoration has been assessed, according to the ecosystem attributes outlined by the Society of Ecological Restoration: namely, integrity, health and sustainability and that are derived from the ecological theory of succession. We reviewed the peer reviewed literature published since 1988 that is listed in the ISI Web of Science journals as well as additional references, such as key books. We exclusively focused on large coastal dune systems (such as transgressive and parabolic dunefields) located on natural or seminatural coasts. We found 150 articles that included "coastal dune", "restoration" and "revegetation" in areas such as title, keywords and abstract. From these, 67 dealt specifically with coastal dune restoration. Most of the studies were performed in the USA, The Netherlands and South Africa, during the last two decades. Restoration success has been assessed directly and indirectly by measuring one or a few ecosystem variables. Some ecosystem attributes have been monitored more frequently (ecosystem integrity) than others (ecosystem health and sustainability). Finally, it is important to consider that ecological succession is a desirable approach in restoration actions. Natural dynamics and disturbances should be considered as part of the restored system, to improve ecosystem integrity, health and

  18. Technologies for lake restoration

    Directory of Open Access Journals (Sweden)

    Helmut KLAPPER

    2003-09-01

    Full Text Available Lakes are suffering from different stress factors and need to be restored using different approaches. The eutrophication remains as the main water quality management problem for inland waters: both lakes and reservoirs. The way to curb the degradation is to stop the nutrient sources and to accelerate the restoration with help of in-lake technologies. Especially lakes with a long retention time need (eco- technological help to decrease the nutrient content in the free water. The microbial and other organic matter from sewage and other autochthonous biomasses, causes oxygen depletion, which has many adverse effects. In less developed countries big reservoirs function as sewage treatment plants. Natural aeration solves problems only partly and many pollutants tend to accumulate in the sediments. The acidification by acid rain and by pyrite oxidation has to be controlled by acid neutralizing technologies. Addition of alkaline chemicals is useful only for soft waters, and technologies for (microbial alkalinization of very acidic hardwater mining lakes are in development. The corrective measures differ from those in use for eutrophication control. The salinization and water shortage mostly occurs if more water is used than available. L. Aral, L. Tschad, the Dead Sea or L. Nasser belong to waters with most severe environmental problems on a global scale. Their hydrologic regime needs to be evaluated. The inflow of salt water at the bottom of some mining lakes adds to stability of stratification, and thus accumulation of hydrogen sulphide in the monimolimnion of the meromictic lakes. Destratification, which is the most used technology, is only restricted applicable because of the dangerous concentrations of the byproducts of biological degradation. The contamination of lakes with hazardous substances from industry and agriculture require different restoration technologies, including subhydric isolation and storage, addition of nutrients for better self

  19. Environmental Quality Information Analysis Center (EQIAC) operating procedures handbook

    Energy Technology Data Exchange (ETDEWEB)

    Walsh, T.E. (Florida Univ., Gainesville, FL (United States)); Das, S. (Oak Ridge National Lab., TN (United States))

    1992-08-01

    The Operating Procedures Handbook of the Environmental Quality Information Analysis Center (EQIAC) is intended to be kept current as EQIAC develops and evolves. Its purpose is to provide a comprehensive guide to the mission, infrastructure, functions, and operational procedures of EQIAC. The handbook is a training tool for new personnel and a reference manual for existing personnel. The handbook will be distributed throughout EQIAC and maintained in binders containing current dated editions of the individual sections. The handbook will be revised at least annually to reflect the current structure and operational procedures of EQIAC. The EQIAC provides information on environmental issues such as compliance, restoration, and environmental monitoring do the Air Force and DOD contractors.

  20. 33 CFR 151.28 - Plan review and revision.

    Science.gov (United States)

    2010-07-01

    ... BALLAST WATER Implementation of MARPOL 73/78 and the Protocol on Environmental Protection to the Antarctic Treaty as it Pertains to Pollution from Ships Oil Pollution § 151.28 Plan review and revision. (a)...

  1. 75 FR 23264 - Public Water System Supervision Program Revision for the State of Alabama

    Science.gov (United States)

    2010-05-03

    ... AGENCY Public Water System Supervision Program Revision for the State of Alabama AGENCY: Environmental... of Alabama is revising its approved Public Water System Supervision Program. Alabama has adopted the..., EPA is tentatively approving this revision to the State of Alabama's Public Water System...

  2. Restoring the incisal edge.

    Science.gov (United States)

    Terry, Douglas A

    2005-01-01

    Restorative dentistry evolves with each development of new material and innovative technique. Selection of improved restorative materials that simulate the physical properties and other characteristics of natural teeth, in combination with restorative techniques such as the proximal adaptation and incremental layering, provide the framework that ensures the optimal development of an esthetic restoration. These advanced placement techniques offer benefits such as enhanced chromatic integration, polychromatism, ideal anatomical form and function, optimal proximal contact, improved marginal integrity and longer lasting directly placed composite restorations. The purpose of this article is to give the reader a better understanding of the complex restorative challenge in achieving true harmonization of the primary parameters in esthetics (that is, color, shape and texture) represented by the replacement of a single anterior tooth. The case presented demonstrates the restoration of a Class IV fracture integrating basic adhesive principles with these placement techniques and a recently developed nanoparticle hybrid composite resin system (Premise, Kerr/Sybron, Orange, CA). The clinical presentation describes preoperative considerations, tooth preparation, development of the body layer, internal characterization with tints, development of the artificial enamel layer, shaping and contouring, and polishing of a Class IV composite restoration. The clinical significance is that anterior tooth fractures can be predictably restored using contemporary small particle hybrid composite resin systems with the aforementioned restorative techniques. These placement techniques when used with proper attention to preparation design, adhesive protocol and finishing and polishing procedures, allow the clinician to successfully restore form, function and esthetics to the single anterior tooth replacement.

  3. Environmental renaissance in Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    Stevens, J.

    2009-07-15

    During centuries of rapid growth of the coal mining industry and expanded development in Pennsylvania, trees were felled, streams were diverted and strip mining caused much environmental damage. All that has now changed. The article gives examples of land and water restoration carried out by organizations such as the Susquehanna River Basin Commission, the West Branch Susquehanna Restoration Coalition and the Anthracite Region Independent Power Producers Association. The Pennsylvania Department of Environmental Protection directs and coordinates environmental projects. 5 photos.

  4. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement; Volume 1, Appendix F, Nevada Test Site and Oak Ridge Reservation Spent Nuclear Fuel Management Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-06-01

    This volume addresses the interim storage of spent nuclear fuel (SNF) at two US Department of Energy sites, the Nevada Test Site (NTS) and the Oak Ridge Reservation (ORR). These sites are being considered to provide a reasonable range of alternative settings at which future SNF management activities could be conducted. These locations are not currently involved in management of large quantities of SNF; NTS has none, and ORR has only small quantities. But NTS and ORR do offer experience and infrastructure for the handling, processing and storage of radioactive materials, and they do exemplify a broad spectrum of environmental parameters. This broad spectrum of environmental parameters will provide, a perspective on whether and how such location attributes may relate to potential environmental impacts. Consideration of these two sites will permit a programmatic decision to be based upon an assessment of the feasible options without bias, to the current storage sites. This volume is divided into four parts. Part One is the volume introduction. Part Two contains chapters one through five for the NTS, as well as references contained in chapter six. Part Three contains chapters one through five for the ORR, as well as references contained in chapter six. Part Four is summary information including the list of preparers, organizations contacted, acronyms, and abbreviations for both the NTS and the ORR. A Table of Contents, List of Figures, and List of Tables are included in parts Two, Three, and Four. This approach permitted the inclusion of both sites in one volume while maintaining consistent chapter numbering.

  5. Solid waste integrated forecast technical (SWIFT) report: FY1997 to FY 2070, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Valero, O.J.; Templeton, K.J.; Morgan, J.

    1997-01-07

    This web site provides an up-to-date report on the radioactive solid waste expected to be managed by Hanford's Waste Management (WM) Project from onsite and offsite generators. It includes: an overview of Hanford-wide solid waste to be managed by the WM Project; program-level and waste class-specific estimates; background information on waste sources; and comparisons with previous forecasts and with other national data sources. This web site does not include: liquid waste (current or future generation); waste to be managed by the Environmental Restoration (EM-40) contractor (i.e., waste that will be disposed of at the Environmental Restoration Disposal Facility (ERDF)); or waste that has been received by the WM Project to date (i.e., inventory waste). The focus of this web site is on low-level mixed waste (LLMW), and transuranic waste (both non-mixed and mixed) (TRU(M)). Some details on low-level waste and hazardous waste are also provided. Currently, this web site is reporting data th at was requested on 10/14/96 and submitted on 10/25/96. The data represent a life cycle forecast covering all reported activities from FY97 through the end of each program's life cycle. Therefore, these data represent revisions from the previous FY97.0 Data Version, due primarily to revised estimates from PNNL. There is some useful information about the structure of this report in the SWIFT Report Web Site Overview.

  6. Phonemic restoration in developmental dyslexia

    Directory of Open Access Journals (Sweden)

    Stephanie N. Del Tufo

    2014-06-01

    Full Text Available The comprehension of fluent speech in one’s native language requires that listeners integrate the detailed acoustic-phonetic information available in the sound signal with linguistic knowledge. This interplay is especially apparent in the phoneme restoration effect, a phenomenon in which a missing phoneme is ‘restored’ via the influence of top-down information from the lexicon and through bottom-up acoustic processing. Developmental dyslexia is a disorder characterized by an inability to read at the level of one’s peers without any clear failure due to environmental influences. In the current study we utilized the phonemic restoration illusion paradigm, to examine individual differences in phonemic restoration across a range of reading ability, from very good to dyslexic readers. Results demonstrate that restoration occurs less in those who have high scores on measures of phonological processing. Based on these results, we suggest that the processing or representation of acoustic detail may not be as reliable in poor and dyslexic readers, with the result that lexical information is more likely to override acoustic properties of the stimuli. This pattern of increased restoration could result from a failure of perceptual tuning, in which unstable representations of speech sounds result in the acceptance of non-speech sounds as speech. An additional or alternative theory is that degraded or impaired phonological processing at the speech sound level may reflect architecture that is overly plastic and consequently fails to stabilize appropriately for speech sound representations. Therefore the inability to separate speech and noise may result as a deficit in separating noise from the acoustic signal.

  7. Estimating the Size and Impact of the Ecological Restoration Economy.

    Directory of Open Access Journals (Sweden)

    Todd BenDor

    Full Text Available Domestic public debate continues over the economic impacts of environmental regulations that require environmental restoration. This debate has occurred in the absence of broad-scale empirical research on economic output and employment resulting from environmental restoration, restoration-related conservation, and mitigation actions - the activities that are part of what we term the "restoration economy." In this article, we provide a high-level accounting of the size and scope of the restoration economy in terms of employment, value added, and overall economic output on a national scale. We conducted a national survey of businesses that participate in restoration work in order to estimate the total sales and number of jobs directly associated with the restoration economy, and to provide a profile of this nascent sector in terms of type of restoration work, industrial classification, workforce needs, and growth potential. We use survey results as inputs into a national input-output model (IMPLAN 3.1 in order to estimate the indirect and induced economic impacts of restoration activities. Based on this analysis we conclude that the domestic ecological restoration sector directly employs ~ 126,000 workers and generates ~ $9.5 billion in economic output (sales annually. This activity supports an additional 95,000 jobs and $15 billion in economic output through indirect (business-to-business linkages and increased household spending.

  8. Estimating the Size and Impact of the Ecological Restoration Economy.

    Science.gov (United States)

    BenDor, Todd; Lester, T William; Livengood, Avery; Davis, Adam; Yonavjak, Logan

    2015-01-01

    Domestic public debate continues over the economic impacts of environmental regulations that require environmental restoration. This debate has occurred in the absence of broad-scale empirical research on economic output and employment resulting from environmental restoration, restoration-related conservation, and mitigation actions - the activities that are part of what we term the "restoration economy." In this article, we provide a high-level accounting of the size and scope of the restoration economy in terms of employment, value added, and overall economic output on a national scale. We conducted a national survey of businesses that participate in restoration work in order to estimate the total sales and number of jobs directly associated with the restoration economy, and to provide a profile of this nascent sector in terms of type of restoration work, industrial classification, workforce needs, and growth potential. We use survey results as inputs into a national input-output model (IMPLAN 3.1) in order to estimate the indirect and induced economic impacts of restoration activities. Based on this analysis we conclude that the domestic ecological restoration sector directly employs ~ 126,000 workers and generates ~ $9.5 billion in economic output (sales) annually. This activity supports an additional 95,000 jobs and $15 billion in economic output through indirect (business-to-business) linkages and increased household spending.

  9. Stripping for Revision.

    Science.gov (United States)

    Smith, Donna

    1996-01-01

    Describes a three-step process by which students are taught to revise their writing by listing each sentence on another paper, combining sentences by eliminating redundancy, reducing information to appositives, and reducing information to participles, as well as revising the reduced number of sentences by including verbals, action verbs,…

  10. Writing as Revision.

    Science.gov (United States)

    Della-Piana, Gabriel M.; Endo, George T.

    This proposal for a longitudinal experimental study with a treatment intervention focuses on the process of writing as revision. Revision refers to the process which occurs prior to and throughout the writing of a work, rather than the final editing. According to this process, the writer goes through five stages: preconceptions concerning style…

  11. EnviroAtlas - Potentially Restorable Wetlands on Agricultural Land - Contiguous United States

    Data.gov (United States)

    U.S. Environmental Protection Agency — The EnviroAtlas Potentially Restorable Wetlands on Agricultural Land (PRW-Ag) dataset shows potentially restorable wetlands at 30-meter resolution. Beginning two...

  12. SUSTAINABLE SOLUTIONS FOR RESTORING DEGRADED WATERSHEDS AND RIPARIAN ECOSYSTEMS: IMPLEMENTATION, EVALUATION, AND AMELIORATION

    Science.gov (United States)

    The objective of the Office of Research and Development (ORD) ecosystem restoration research strategy is to evaluate the effectiveness of restoration and management practices for achieving desired environmental conditions that protect and enhance ecosystem services for society. T...

  13. Restoring the worn dentition.

    Science.gov (United States)

    Ibsen, R L; Ouellet, D F

    1992-01-01

    Strong dental materials and dental porcelains are providing dentists with restorative opportunities that are more conservative because they require less destruction of healthy tooth structure and yield a more esthetic result. In cases of severe wear due to attrition, abrasion, and erosion, this process can be stopped, restoring the esthetics and function by using proper techniques and materials. The case report described in this article demonstrates the conservative restoration of severe wear due to attrition and erosion. Teeth were lengthened, wear was restored, and further wear was ceased by using a combination of bonded porcelain, a heat, light, and self-cure resin system, and a new glass-ionomer restorative material. The result was a strong, durable restoration (that required no anesthesia) with high esthetics.

  14. Watershed Restoration Project

    Energy Technology Data Exchange (ETDEWEB)

    Julie Thompson; Betsy Macfarlan

    2007-09-27

    In 2003, the U.S. Department of Energy issued the Eastern Nevada Landscape Coalition (ENLC) funding to implement ecological restoration in Gleason Creek and Smith Valley Watersheds. This project was made possible by congressionally directed funding that was provided through the US Department of Energy, Energy Efficiency and Renewable Energy, Office of the Biomass Program. The Ely District Bureau of Land Management (Ely BLM) manages these watersheds and considers them priority areas within the Ely BLM district. These three entities collaborated to address the issues and concerns of Gleason Creek and Smith Valley and prepared a restoration plan to improve the watersheds’ ecological health and resiliency. The restoration process began with watershed-scale vegetation assessments and state and transition models to focus on restoration sites. Design and implementation of restoration treatments ensued and were completed in January 2007. This report describes the restoration process ENLC undertook from planning to implementation of two watersheds in semi-arid Eastern Nevada.

  15. Upgrading Marine Ecosystem Restoration Using Ecological-Social Concepts.

    Science.gov (United States)

    Abelson, Avigdor; Halpern, Benjamin S; Reed, Daniel C; Orth, Robert J; Kendrick, Gary A; Beck, Michael W; Belmaker, Jonathan; Krause, Gesche; Edgar, Graham J; Airoldi, Laura; Brokovich, Eran; France, Robert; Shashar, Nadav; de Blaeij, Arianne; Stambler, Noga; Salameh, Pierre; Shechter, Mordechai; Nelson, Peter A

    2016-02-01

    Conservation and environmental management are principal countermeasures to the degradation of marine ecosystems and their services. However, in many cases, current practices are insufficient to reverse ecosystem declines. We suggest that restoration ecology, the science underlying the concepts and tools needed to restore ecosystems, must be recognized as an integral element for marine conservation and environmental management. Marine restoration ecology is a young scientific discipline, often with gaps between its application and the supporting science. Bridging these gaps is essential to using restoration as an effective management tool and reversing the decline of marine ecosystems and their services. Ecological restoration should address objectives that include improved ecosystem services, and it therefore should encompass social-ecological elements rather than focusing solely on ecological parameters. We recommend using existing management frameworks to identify clear restoration targets, to apply quantitative tools for assessment, and to make the re-establishment of ecosystem services a criterion for success.

  16. Upgrading Marine Ecosystem Restoration Using Ecological‐Social Concepts

    Science.gov (United States)

    Abelson, Avigdor; Halpern, Benjamin S.; Reed, Daniel C.; Orth, Robert J.; Kendrick, Gary A.; Beck, Michael W.; Belmaker, Jonathan; Krause, Gesche; Edgar, Graham J.; Airoldi, Laura; Brokovich, Eran; France, Robert; Shashar, Nadav; de Blaeij, Arianne; Stambler, Noga; Salameh, Pierre; Shechter, Mordechai; Nelson, Peter A.

    2015-01-01

    Conservation and environmental management are principal countermeasures to the degradation of marine ecosystems and their services. However, in many cases, current practices are insufficient to reverse ecosystem declines. We suggest that restoration ecology, the science underlying the concepts and tools needed to restore ecosystems, must be recognized as an integral element for marine conservation and environmental management. Marine restoration ecology is a young scientific discipline, often with gaps between its application and the supporting science. Bridging these gaps is essential to using restoration as an effective management tool and reversing the decline of marine ecosystems and their services. Ecological restoration should address objectives that include improved ecosystem services, and it therefore should encompass social–ecological elements rather than focusing solely on ecological parameters. We recommend using existing management frameworks to identify clear restoration targets, to apply quantitative tools for assessment, and to make the re-establishment of ecosystem services a criterion for success. PMID:26977115

  17. The management of femoral bone stock in THA revision: indications and techniques.

    Science.gov (United States)

    Bianchi, Luca; Galante, Claudio; Zagra, Luigi

    2014-10-02

    Following the increasing number of total hip arthroplasties, the amount of hip revision procedures continue to rise. Careful patient selection and bone loss evaluation is crucial for a correct management of femoral revision procedures. The key point in femoral revision is to obtain a reliable primary stability of the stem, with the least invasive implant as possible, to preserve and if possible to restore the bone stock. In this article we present the indications and the techniques for the femoral revisions most commonly used in Europe, referring to the evidence in the literature and our personal experiences.

  18. Importance of including cultural practices in ecological restoration.

    Science.gov (United States)

    Wehi, Priscilla M; Lord, Janice M

    2017-10-01

    Ecosystems worldwide have a long history of use and management by indigenous cultures. However, environmental degradation can reduce the availability of culturally important resources. Ecological restoration aims to repair damage to ecosystems caused by human activity, but it is unclear how often restoration projects incorporate the return of harvesting or traditional life patterns for indigenous communities. We examined the incorporation of cultural use of natural resources into ecological restoration in the context of a culturally important but protected New Zealand bird; among award-winning restoration projects in Australasia and worldwide; and in the peer-reviewed restoration ecology literature. Among New Zealand's culturally important bird species, differences in threat status and availability for hunting were large. These differences indicate the values of a colonizing culture can inhibit harvesting by indigenous people. In Australasia among award-winning ecological restoration projects, <17% involved human use of restored areas beyond aesthetic or recreational use, despite many projects encouraging community participation. Globally, restoration goals differed among regions. For example, in North America, projects were primarily conservation oriented, whereas in Asia and Africa projects frequently focused on restoring cultural harvesting. From 1995 to 2014, the restoration ecology literature contained few references to cultural values or use. We argue that restoration practitioners are missing a vital component for reassembling functional ecosystems. Inclusion of sustainably harvestable areas within restored landscapes may allow for the continuation of traditional practices that shaped ecosystems for millennia, and also aid project success by ensuring community support. © 2017 Society for Conservation Biology.

  19. Planning aquatic ecosystem restoration monitoring programs

    Energy Technology Data Exchange (ETDEWEB)

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  20. Flow Restoration in the Columbia River Basin: An Evaluation of a Flow Restoration Accounting Framework.

    Science.gov (United States)

    McCoy, Amy L; Holmes, S Rankin; Boisjolie, Brett A

    2017-08-30

    Securing environmental flows in support of freshwater biodiversity is an evolving field of practice. An example of a large-scale program dedicated to restoring environmental flows is the Columbia Basin Water Transactions Program in the Pacific Northwest region of North America, which has been restoring flows in dewatered tributary habitats for imperiled salmon species over the past decade. This paper discusses a four-tiered flow restoration accounting framework for tracking the implementation and impacts of water transactions as an effective tool for adaptive management. The flow restoration accounting framework provides compliance and flow accounting information to monitor transaction efficacy. We review the implementation of the flow restoration accounting framework monitoring framework to demonstrate (a) the extent of water transactions that have been implemented over the past decade, (b) the volumes of restored flow in meeting flow targets for restoring habitat for anadromous fish species, and (c) an example of aquatic habitat enhancement that resulted from Columbia Basin Water Transactions Program investments. Project results show that from 2002 to 2015, the Columbia Basin Water Transactions Program has completed more than 450 water rights transactions, restoring approximately 1.59 million megaliters to date, with an additional 10.98 million megaliters of flow protected for use over the next 100 years. This has resulted in the watering of over 2414 stream kilometers within the Columbia Basin. We conclude with a discussion of the insights gained through the implementation of the flow restoration accounting framework. Understanding the approach and efficacy of a monitoring framework applied across a large river basin can be informative to emerging flow-restoration and adaptive management efforts in areas of conservation concern.

  1. Water Pollution. Environmental Education Curriculum. Revised.

    Science.gov (United States)

    Topeka Public Schools, KS.

    Water is one of the most polluted resources in our environment. Since everyone has the same basic need for pure water, it follows that all people should have a basic knowledge of the causes, results and solutions to the water pollution problem. This unit is designed for use with Level II and III educable mentally retarded students to present…

  2. Restoration of optic neuropathy

    Directory of Open Access Journals (Sweden)

    You SW

    2017-03-01

    Full Text Available Si-Wei You,1 Ming-Mei Wu,2 Fang Kuang,2 Kin-Sang Cho,3 Kwok-Fai So4,5 1Department of Ophthalmology, Xijing Hospital, 2Institute of Neurosciences, The Fourth Military Medical University, Xi’an, China; 3Schepens Eye Research Institute, Massachusetts Eye and Ear, Department of Ophthalmology, Harvard Medical School, Boston, MA, USA; 4GHM Institute of CNS Regeneration, Key Laboratory of Brain Function and Diseases, Jinan University, Guangzhou, 5Department of Ophthalmology, The State Key laboratory of Brain and Cognitive Sciences, The University of Hong Kong, Hong Kong SAR, China Abstract: Optic neuropathy refers to disorders involving the optic nerve (ON. Any damage to ON or ON-deriving neurons, the retinal ganglion cells (RGCs, may lead to the breakdown of the optical signal transmission from the eye to the brain, thus resulting in a partial or complete vision loss. The causes of optic neuropathy include trauma, ischemia, inflammation, compression, infiltration, and mitochondrial damages. ON injuries include primary and secondary injuries. During these injury phases, various factors orchestrate injured axons to die back and become unable to regenerate, and these factors could be divided into two categories: extrinsic and intrinsic. Extrinsic inhibitory factors refer to the environmental conditions that influence the regeneration of injured axons. The presence of myelin inhibitors and glial scar, lack of neurotrophic factors, and inflammation mediated by injury are regarded as these extrinsic factors. Extrinsic factors need to trigger the intracellular signals to exert inhibitory effect. Proper regulation of these intracellular signals has been shown to be beneficial to ON regeneration. Intrinsic factors of RGCs are the pivotal reasons that inhibit ON regeneration and are closely linked with extrinsic factors. Intracellular cyclic adenosine monophosphate (cAMP and calcium levels affect axon guidance and growth cone response to guidance molecules

  3. Environmental Restoration Disposal Facility Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Caulfield, R.

    2012-07-12

    The purpose of lessons learned is to identify insight gained during a project – successes or failures – that can be applied on future projects. Lessons learned can contribute to the overall success of a project by building on approaches that have worked well and avoiding previous mistakes. Below are examples of lessons learned during ERDF’s ARRA-funded expansion project.

  4. Risk communication in environmental restoration programs

    Energy Technology Data Exchange (ETDEWEB)

    Bradbury, J.A.

    1993-04-01

    The author advocates adoption of a convergence model in place of the traditional source-receiver model of communication for communicating with members of the public who have a stake in remediation of a nearby site. The source-receiver model conceives of communication as the transmission of a message from a risk management agency (sender) to a target audience of the public (receivers). The underlying theme is that the sender intends to change the perception of the receiver of either the issue or the sender of information. The theme may be appropriate for health campaigns which seek to change public behavior; however, the author draws on her experience at a DOE site undergoing remediation to illustrate why the convergence model is more appropriate in the context of cleanup. This alternative model focuses on the Latin derivation of communication as sharing or making common to many, i.e., as involving a relationship between participants who engage in a process of communication. The focus appears to be consistent with recently issued DOE policy that calls for involving the public in identifying issues and problems and in formulating and evaluating decision alternatives in cleanup. By emphasizing context, process and participants, as opposed to senders and receivers, the model identifies key issues to address in facilitating consensus concerning the risks of cleanup. Similarities between the institutional context of DOE and DOD suggest that a convergence model may also prove to be an appropriate conceptual foundation for risk communication at contaminated DOD sites.

  5. Risk communication in environmental restoration programs

    Energy Technology Data Exchange (ETDEWEB)

    Bradbury, J.A.

    1993-04-01

    The author advocates adoption of a convergence model in place of the traditional source-receiver model of communication for communicating with members of the public who have a stake in remediation of a nearby site. The source-receiver model conceives of communication as the transmission of a message from a risk management agency (sender) to a target audience of the public (receivers). The underlying theme is that the sender intends to change the perception of the receiver of either the issue or the sender of information. The theme may be appropriate for health campaigns which seek to change public behavior; however, the author draws on her experience at a DOE site undergoing remediation to illustrate why the convergence model is more appropriate in the context of cleanup. This alternative model focuses on the Latin derivation of communication as sharing or making common to many, i.e., as involving a relationship between participants who engage in a process of communication. The focus appears to be consistent with recently issued DOE policy that calls for involving the public in identifying issues and problems and in formulating and evaluating decision alternatives in cleanup. By emphasizing context, process and participants, as opposed to senders and receivers, the model identifies key issues to address in facilitating consensus concerning the risks of cleanup. Similarities between the institutional context of DOE and DOD suggest that a convergence model may also prove to be an appropriate conceptual foundation for risk communication at contaminated DOD sites.

  6. Environmental contamination: health risks and ecological restoration

    National Research Council Canada - National Science Library

    Wong, Ming H

    2013-01-01

    "Drawn from presentations made during the Croucher Advanced Study Institute workshop held in 2010, this volume covers all the fundamentals necessary for contaminated site assessment and remediation...

  7. Toxicological benchmarks for wildlife. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Opresko, D.M.; Sample, B.E.; Suter, G.W.

    1993-09-01

    This report presents toxicological benchmarks for assessment of effects of 55 chemicals on six representative mammalian wildlife species (short-tailed shrew, white-footed mouse, cottontail ink, red fox, and whitetail deer) and eight avian wildlife species (American robin, woodcock, wild turkey, belted kingfisher, great blue heron, barred owl, Cooper`s hawk, and redtailed hawk) (scientific names are presented in Appendix C). These species were chosen because they are widely distributed and provide a representative range of body sizes and diets. The chemicals are some of those that occur at United States Department of Energy (DOE) waste sites. The benchmarks presented in this report are values believed to be nonhazardous for the listed wildlife species.

  8. Transforming ecosystems: When, where, and how to restore contaminated sites.

    Science.gov (United States)

    Rohr, Jason R; Farag, Aïda M; Cadotte, Marc W; Clements, William H; Smith, James R; Ulrich, Cheryl P; Woods, Richard

    2016-04-01

    Chemical contamination has impaired ecosystems, reducing biodiversity and the provisioning of functions and services. This has spurred a movement to restore contaminated ecosystems and develop and implement national and international regulations that require it. Nevertheless, ecological restoration remains a young and rapidly growing discipline and its intersection with toxicology is even more nascent and underdeveloped. Consequently, we provide guidance to scientists and practitioners on when, where, and how to restore contaminated ecosystems. Although restoration has many benefits, it also can be expensive, and in many cases systems can recover without human intervention. Hence, the first question we address is: "When should we restore contaminated ecosystems?" Second, we provide suggestions on what to restore-biodiversity, functions, services, all 3, or something else--and where to restore given expected changes to habitats driven by global climate change. Finally, we provide guidance on how to restore contaminated ecosystems. To do this, we analyze critical aspects of the literature dealing with the ecology of restoring contaminated ecosystems. Additionally, we review approaches for translating the science of restoration to on-the-ground actions, which includes discussions of market incentives and the finances of restoration, stakeholder outreach and governance models for ecosystem restoration, and working with contractors to implement restoration plans. By explicitly considering the mechanisms and strategies that maximize the success of the restoration of contaminated sites, we hope that our synthesis serves to increase and improve collaborations between restoration ecologists and ecotoxicologists and set a roadmap for the restoration of contaminated ecosystems. © 2015 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of SETAC.

  9. 78 FR 32223 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-05-29

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... Revisions AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: The State of..., Region 6, Regional Authorization Coordinator, (6PD-O), Multimedia Planning and Permitting Division,...

  10. 76 FR 19004 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-04-06

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... Revisions AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: The State of... 6, Regional Authorization Coordinator, (6PD-O), Multimedia Planning and Permitting Division, at...

  11. 75 FR 65442 - New Mexico: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2010-10-25

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... Revisions AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: The State of New... Patterson, Region 6, Regional Authorization Coordinator, (6PD-O), Multimedia Planning and...

  12. 76 FR 56706 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-09-14

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... Environmental protection, Air pollution control, Intergovernmental relations, Ozone, Reporting and recordkeeping...

  13. 75 FR 13468 - Disapproval of California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution...

    Science.gov (United States)

    2010-03-22

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to disapprove a revision to the Monterey Bay Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations, Nitrogen...

  14. 76 FR 68106 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-11-03

    ... Unified Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference...

  15. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  16. 76 FR 70886 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-11-16

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  17. 77 FR 2228 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-01-17

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  18. 77 FR 25384 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-04-30

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... Environmental protection, Air pollution control, Intergovernmental relations, Ozone, Reporting and...

  19. 76 FR 53640 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-08-29

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  20. 76 FR 47076 - Revision to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-08-04

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of a revision to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  1. 76 FR 69135 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-11-08

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  2. 77 FR 35327 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-06-13

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control,...

  3. 78 FR 6740 - Revisions to the California State Implementation Plan, San Joaquin Valley United Air Pollution...

    Science.gov (United States)

    2013-01-31

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley United Air Pollution Control... CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  4. Letter of Map Revision

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — The National Flood Hazard Layer (NFHL) data incorporates all Digital Flood Insurance Rate Map(DFIRM) databases published by FEMA, and any Letters Of Map Revision...

  5. Katz's revisability paradox dissolved

    NARCIS (Netherlands)

    Tamminga, Allard; Verhaegh, Sander

    2013-01-01

    Quine's holistic empiricist account of scientific inquiry can be characterized by three constitutive principles: noncontradiction, universal revisability and pragmatic ordering. We show that these constitutive principles cannot be regarded as statements within a holistic empiricist's scientific theo

  6. Katz's revisability paradox dissolved

    NARCIS (Netherlands)

    Tamminga, Allard; Verhaegh, Sander

    2013-01-01

    Quine's holistic empiricist account of scientific inquiry can be characterized by three constitutive principles: noncontradiction, universal revisability and pragmatic ordering. We show that these constitutive principles cannot be regarded as statements within a holistic empiricist's scientific

  7. Revised Total Coliform Rule

    Science.gov (United States)

    The Revised Total Coliform Rule (RTCR) aims to increase public health protection through the reduction of potential pathways for fecal contamination in the distribution system of a public water system (PWS).

  8. Toponymic Restoration in Irkutsk

    Directory of Open Access Journals (Sweden)

    Alexander Snarsky

    2016-10-01

    Full Text Available The article analyzes the discussion on restoration of historical names of public spaces in Irkutsk. It also reviews different approaches to the problem that appeared in the historical science and publicism. The author says about the necessity of a strictly historical approach to the toponymic restoration.

  9. Guiding Restoration Principles

    Science.gov (United States)

    2004-12-01

    restoration of important ecosystem functions requires reintegrating landscapes or restorating the func- tional aspects of landscapes ( Risser 1992...51-64. Risser , P. G. 1992. Landscape ecology approach to ecosystem rehabilitation. Pages 37-46 in M. L. Wali (ed.), Ecosystem Rehabilitation

  10. 76 FR 69734 - Public Water System Supervision Program Revision for the State of New Mexico

    Science.gov (United States)

    2011-11-09

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Public Water System Supervision Program Revision for the State of New Mexico AGENCY: Environmental... of New Mexico is revising its approved Public Water System Supervision Program. New Mexico...

  11. 76 FR 7845 - Public Water System Supervision Program Revision for the State of Utah

    Science.gov (United States)

    2011-02-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY Public Water System Supervision Program Revision for the State of Utah AGENCY: Environmental... the State of Utah has revised its Public Water System Supervision (PWSS) Program by adopting...

  12. Mapping Flood Reduction Benefits of Potential Wetlands Restoration

    Science.gov (United States)

    Public officials and environmental managers face difficult decisions when allocating funds to prioritize the most beneficial wetlands conservation or restoration projects, and often face difficulty even characterizing benefits. One benefit of natural and constructed wetlands is t...

  13. A Function-Based Framework for Stream Assessment & Restoration Projects

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Developed by the U.S. Environmental Protection Agency (EPA) and affiliates for approaching stream assessment and restoration from a function-based perspective. May...

  14. Restoring the Savanna to the Savannah River Site.

    Energy Technology Data Exchange (ETDEWEB)

    Harrington, Timothy B.

    2006-07-01

    The Longleaf Pine Ecosystem - Ecology, Silviculture, and Restoration. Shibu Jose, Eric J. Jokela, and Deborah L. Miller, (eds.) Springer Series on Environmental Management. Springer Science and Business Media publisher. Chapter 5. Pp 135-156. Chapter 5 of the book.

  15. Mapping Flood Reduction Benefits of Potential Wetlands Restoration

    Science.gov (United States)

    Public officials and environmental managers face difficult decisions when allocating funds to prioritize the most beneficial wetlands conservation or restoration projects, and often face difficulty even characterizing benefits. One benefit of natural and constructed wetlands is t...

  16. Upgrading Marine Ecosystem Restoration Using Ecological-Social Concepts

    NARCIS (Netherlands)

    Abelson, Avigdor; Halpern, Benjamin S.; Reed, Daniel C.; Orth, Robert J.; Kendrick, Gary A.; Beck, Michael W.; Belmaker, Jonathan; Krause, Gesche; Edgar, Graham J.; Airoldi, Laura; Brokovich, Eran; France, Robert; Shashar, Nadav; Blaeij, De Arianne; Stambler, Noga; Salameh, Pierre; Shechter, Mordechai; Nelson, Peter A.

    2016-01-01

    Conservation and environmental management are principal countermeasures to the degradation of marine ecosystems and their services. However, in many cases, current practices are insufficient to reverse ecosystem declines. We suggest that restoration ecology, the science underlying the concepts

  17. Shifting paradigms in coastal restoration: Six decades' lessons from China.

    Science.gov (United States)

    Liu, Zezheng; Cui, Baoshan; He, Qiang

    2016-10-01

    With accelerating degradation of coastal environment worldwide, restoration has been elevated as a global strategy to enhance the functioning and social services of coastal ecosystems. While many developing countries suffer from intense coastal degradation, current understanding of the science and practice of their coastal restorations is extremely limited. Based on analysis of >1000 restoration projects, we provide the first synthesis of China's coastal restorations. We show that China's coastal restoration has recently entered a rapidly developing stage, with an increasing number of restoration projects carried out in multiple types of coastal ecosystems. While long-term, national-level restorations enforced by the government appear promising for some coastal ecosystems, especially mangroves, restorations of many other coastal ecosystems, such as salt marshes, seagrasses and coral reefs, have been much less implemented, likely due to under-appreciation of their ecosystem services values. Furthermore, the planning, techniques, research/assessment, and participation models underlying current restorations remain largely inadequate for restoration to effectively halt rapid coastal degradation. To promote success, we propose a framework where paradigms in current restorations from planning to implementation and assessment are transformed in multiple ways. Our study has broad implications for coastal environmental management policies and practices, and should inform sustainable development of coupled human-ocean systems in many countries.

  18. What constitutes an ideal dental restorative material?

    Science.gov (United States)

    Rekow, E D; Bayne, S C; Carvalho, R M; Steele, J G

    2013-11-01

    Intense environmental concerns recently have prompted dentistry to evaluate the performance and environmental impact of existing restoration materials. Doing so entices us to explore the 'what if?' innovation in materials science to create more ideal restorative materials. Articulating a specification for our design and evaluation methods is proving to be more complicated than originally anticipated. Challenges exist not only in specifying how the material should be manipulated and perform clinically but also in understanding and incorporating implications of the skill of the operator placing the restoration, economic considerations, expectations patients have for their investment, cost-effectiveness, influences of the health care system on how and for whom restorations are to be placed, and global challenges that limit the types of materials available in different areas of the world. The quandary is to find ways to actively engage multiple stakeholders to agree on priorities and future actions to focus future directions on the creation of more ideal restorative materials that can be available throughout the world.

  19. Ecological Modeling Guide for Ecosystem Restoration and Management

    Science.gov (United States)

    2012-08-01

    bioenergetics model into a spatially explicit water quality model : Application to menhaden in Chesapeake Bay. Ecological Modelling 221: 1922-1933...ER D C/ EL T R -1 2 -1 8 Environmental Benefits Analysis Program Ecological Modeling Guide for Ecosystem Restoration and Management E nv...distribution is unlimited. Environmental Benefits Analysis Program ERDC/EL TR-12-18 August 2012 Ecological Modeling Guide for Ecosystem Restoration and

  20. EnviroAtlas - Candidate Areas for Ecological Restoration for the Conterminous United States

    Data.gov (United States)

    U.S. Environmental Protection Agency — This EnviroAtlas dataset shows the candidate areas for ecological restoration, identified as close but geographically disjunct vegetated regions. Ecological...