WorldWideScience

Sample records for review internal team

  1. Guidelines for IAEA International Regulatory Review Teams (IRRTs)

    International Nuclear Information System (INIS)

    1993-04-01

    This document is intended to be used by International regulatory review teams in reviewing the activities of a regulatory body as applicable to the regulation of nuclear power plants. The mission will, however, take note of any other activities of the regulatory body when drawing up the review report. The document does not specifically deal with the functions of a regulatory body responsible for other types of nuclear facilities or related nuclear activities, but it is intended that the concepts presented in the document could be applied where appropriate. Refs

  2. International Expert Team Concludes IAEA Peer Review of Slovakia's Regulatory Framework for Nuclear Safety

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An international team of senior nuclear safety and radiation protection experts today concluded an 11-day mission to review the regulatory framework for nuclear safety in Slovakia. At the request of the Slovak Government, the IAEA assembled a team of 12 senior regulatory experts from 12 nations to conduct the Integrated Regulatory Review Service (IRRS) mission involving the Nuclear Regulatory Authority of the Slovak Republic (UJD SR). The international experts also met officials from the Public Health Authority of the Slovak Republic (UVZ SR) regarding the regulation of occupational radiation protection in nuclear facilities. The mission is a peer review based on the IAEA Safety Standards. Marta Ziakova, Chairperson of the Nuclear Regulatory Authority of Slovak Republic, declared that ''The IRRS mission has a great value for the future development and orientation of the UJD SR.'' ''Slovakia has established a regulatory framework for nuclear safety which is in line with international standards and practice,'' said Mission Team Leader Andrej Stritar, Director of the Slovenian Nuclear Safety Administration. The main observations of the IRRS Review team included: UJD SR operates with independence and transparency; UJD SR has developed and implemented a systematic training approach to meet its competence needs; and in response to the accident at TEPCO's Fukushima Daiichi Nuclear Power Station, UJD SR has reacted and communicated to interested parties, including the public. The good practices identified by the IRRS Review Team include: UJD SR has a comprehensive and well-formalized strategic approach to informing and consulting interested parties; UJD SR has developed and implemented a structured approach to training and developing its staff; and Detailed legal requirements provide a solid basis for on-site and off-site response in nuclear emergencies coordinated with local authorities. The IRRS Review team identified areas for further improvement and believes

  3. International Expert Team Concludes IAEA Peer Review of Poland's Regulatory Framework for Nuclear and Radiation Safety

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: International safety experts last week concluded a two-week International Atomic Energy Agency (IAEA) mission to review the regulatory framework for nuclear and radiation safety in Poland. In its preliminary report, the Integrated Regulatory Review Service (IRRS) mission team found that Poland's nuclear regulator, Panstwowa Agencja Atomistyki (PAA), has a clear commitment to safety, a high level of transparency, competent staff and leadership, and a good recognition of challenges ahead related to Poland's efforts to develop nuclear power. ''Poland's regulatory framework and the work of PAA give high confidence of strong radiation protection for the Polish people. Further, there has been significant progress in the development of Poland's regulatory framework in preparation for the challenge of regulating nuclear power,'' said team leader Robert Lewis, a senior executive in the US Nuclear Regulatory Commission. The mission was conducted at the request of the Government of Poland from 15-25 April. The team was made up of 11 regulatory experts from Belgium, the Czech Republic, Finland, France, the Republic of Korea, Slovakia, Slovenia, Sweden, the United Arab Emirates, the United Kingdom and the United States, as well as five IAEA staff members. The IRRS review team was very thorough in its review, and we welcome its advice on how to continue to improve our programmes to protect people and the environment , said Janusz Wlodarski, President of PAA. The team interviewed members of PAA and officials from various ministries, as well as key players in the Polish safety framework. Such IRRS missions are peer reviews based on IAEA Safety Standards, not inspections or audits. Among its main observations the IRRS review team identified the following good practices: Applying the considerable experience of PAA's senior management to regulatory issues; The introduction of changes to Poland's laws and regulations following broad public consultation at an early stage in

  4. Uranium Production Safety Assessment Team. UPSAT. An international peer review service for uranium production facilities

    International Nuclear Information System (INIS)

    1996-01-01

    The IAEA Uranium Production Safety Assessment Team (UPSAT) programme is designed to assist Member States to improve the safe operation of uranium production facilities. This programme facilitates the exchange of knowledge and experience between team members and industry personnel. An UPSAT mission is an international expert review, conducted outside of any regulatory framework. The programme is implemented in the spirit of voluntary co-operation to contribute to the enhancement of operational safety and practices where it is most effective, at the facility itself. An UPSAT review supplements other facility and regulatory efforts which may have the same objective

  5. An international peer review of the programme for evaluating sites for near surface disposal of radioactive waste in Lithuania. Report of the IAEA International Review Team

    International Nuclear Information System (INIS)

    2006-12-01

    Lithuania's national Radioactive Waste Management Agency (RATA) is mandated by national legislation to find a disposal solution for radioactive waste arising mainly from the operation and decommissioning of the Ignalina nuclear power plant. A key step in the process of obtaining a disposal solution is to identify potential sites for detailed consideration. The RATA has completed this first step and is now directing a programme for detailed investigation of these sites. In this context, the RATA requested that the IAEA, on the basis of its statutory mandate to establish safety standards and provide for their application, conduct a peer review of the safety of the proposed disposal concept. The objective of the peer review, carried out in December 2005, was to provide an independent assessment of the safety related aspects of the sites under consideration on the basis of international safety standards and applicable national standards. The review also considered the feasibility of the proposed reference design and its suitability for the local conditions. The peer review provides an independent opinion as to whether the RATA's siting and site characterization programme is consistent with international standards and agrees with good practice in other national disposal programmes. Peer reviews are increasingly being acknowledged as an important component in building broader stakeholder confidence in the safety of facilities. For this reason, an increase in their number and frequency is anticipated. The coming into force of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management has also focused attention on the demonstration of the safety of waste management facilities. This report presents the consensus view of the international group of experts convened by the IAEA to carry out the review. The findings and recommendations of the Review Team were grouped under six topics considered to be of fundamental importance

  6. Guidelines for IAEA International Regulatory Review Teams (IRRTs)

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA International Regulatory Review Team (IRRT) programme provides advice and assistance to Member States to strengthen and enhance the effectiveness of the nuclear regulatory body whilst recognizing the ultimate responsibility of each Member State for nuclear safety. The IRRT programme, initiated in 1989, is not restricted to any particular group of Member States, whether developing or industrialized, but is available to all countries with nuclear installations in operation or approaching operation. The basic concepts, purposes and functions of a national regulatory body are well recognized in all Member States having a nuclear power programme. The IAEA Safety Standards Series publication entitled 'Legal and Governmental Infrastructure for Nuclear, Radiation, Radioactive Waste and Transport Safety, Safety: Requirements', No. GS-R-1 (2000), provides a general consensus reference for the practices necessary for a national organization to fulfil the regulatory purposes and discharge the regulatory functions. The Requirements also defines the terms used in these guidelines. The guidance given in the Requirements recognizes that the organizational structure and regulatory processes will vary from country to country depending on their existing constitutional, legal and administrative systems; the size and structure of their nuclear programme; the technical skills and professional and financial resources available to their regulatory body, and social customs and cultural traditions. The objective of this report is to provide guidance on the basic structure of an IRRT mission and provide a common reference both across the various areas covered by an IRRT mission and across all the missions in the programme. As such, it is addressed, principally, to the team members of IRRT missions but it also provides guidance to a host regulatory body receiving a mission. This report identifies the objectives of the IRRT mission and sets out the scope of the topic areas that are

  7. ITER review team takes bullish stance

    International Nuclear Information System (INIS)

    Lawler, A.

    1997-01-01

    A large team of U.S. fusion researchers last week began poring over the latest blueprints for a massive international machine designed to demonstrate fusion power and provide plasma physicists with an exciting new facility. The review of the $10 billion International Thermonuclear Experimental Reactor (ITER) was prompted by controversy over the reactor's design and the shrinking U.S. fusion budget

  8. International virtual teams engineering global success

    CERN Document Server

    Brewer, P

    2015-01-01

    As a complete guide to international virtual team communication with practical problem-solving strategies, this book is a must read for managers and engineers in all stages of their professional development This book provides essential information for creating and maintaining successful international virtual teams for those who manage, participate in, or train others in international virtual teaming. Based on new studies in engineering communication, this book presents processes and principles that can help managers and engineers establish global virtual teams that work, assess the virtual team climate, and maintain the effectiveness of virtual teams across cultural boundaries. It provides knowledge and tools necessary to understand the variable contexts of global virtual teams, so that organizations are able to respond to inevitable changes in technology and the global marketplace.

  9. Team dynamics within quality improvement teams: a scoping review.

    Science.gov (United States)

    Rowland, Paula; Lising, Dean; Sinclair, Lynne; Baker, G Ross

    2018-03-31

    This scoping review examines what is known about the processes of quality improvement (QI) teams, particularly related to how teams impact outcomes. The aim is to provide research-informed guidance for QI leaders and to inform future research questions. Databases searched included: MedLINE, EMBASE, CINAHL, Web of Science and SCOPUS. Eligible publications were written in English, published between 1999 and 2016. Articles were included in the review if they examined processes of the QI team, were related to healthcare QI and were primary research studies. Studies were excluded if they had insufficient detail regarding QI team processes. Descriptive detail extracted included: authors, geographical region and health sector. The Integrated (Health Care) Team Effectiveness Model was used to synthesize findings of studies along domains of team effectiveness: task design, team process, psychosocial traits and organizational context. Over two stages of searching, 4813 citations were reviewed. Of those, 48 full-text articles are included in the synthesis. This review demonstrates that QI teams are not immune from dysfunction. Further, a dysfunctional QI team is not likely to influence practice. However, a functional QI team alone is unlikely to create change. A positive QI team dynamic may be a necessary but insufficient condition for implementing QI strategies. Areas for further research include: interactions between QI teams and clinical microsystems, understanding the role of interprofessional representation on QI teams and exploring interactions between QI team task, composition and process.

  10. Internal safety review team at Comanche Peak SES

    Energy Technology Data Exchange (ETDEWEB)

    Davis, D [Comanche Peak Steam Electric Staion, Texas Utilities, TX (United States)

    1997-09-01

    The presentations describes the following issues: levels of defense in depth; internal safety review organizations; methods used to perform safety assessment; safety committee review; quality verification; root cause analysis; human performance program; industry operating experience.

  11. The work of the Operational Safety Review Team (OSART)

    International Nuclear Information System (INIS)

    Hide, K.W.

    1996-01-01

    The Operational Safety Review Team (OSART) programme was set up by the IAEA in 1982 to assist Member States to enhance the operational safety of nuclear power plants. Each team is staffed by senior experts in the relevant fields. The review team discusses with plant staff the existing operational programmes for plant which may be under construction, being commissioned or already operating. Following a detailed examination of a safety programme, the OSART team lists strengths and weaknesses and makes recommendations on how to overcome the latter. Since their conclusions are based on the best prevailing international practice, they may be more stringent than those based on national criteria. The results of the 77 missions conducted at 62 plants in 28 countries by the end of 1994 are summarised. (UK)

  12. International Expert Team Concludes IAEA Peer Review of Finland's Regulatory Framework for Nuclear and Radiation Safety

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: International safety experts today concluded a two-week International Atomic Energy Agency (IAEA) mission to review the regulatory framework for nuclear and radiation safety in Finland. In its preliminary report, the Integrated Regulatory Review Service (IRRS) mission team found that the Radiation and Nuclear Safety Authority of Finland (STUK) is a competent and highly credible regulator that is open and transparent and derives great strength from the technical competence of its staff. ''Finland's comprehensive regulatory framework allows STUK to operate in practice as an independent regulatory body,'' said team leader Philippe Jamet, a commissioner of the French regulatory body ASN. The mission was conducted at the request of the Government of Finland from 15-26 October. The team interviewed members of STUK and officials from various ministries, as well as key players in the Finnish safety framework. Such IRRS missions are peer reviews based on IAEA Safety Standards, not inspections or audits. The team was made up of 18 members from Bulgaria, Canada, the Czech Republic, France, Germany, Iceland, Ireland, Romania, the Russian Federation, South Africa, Slovakia, Slovenia, Spain, Sweden, the United Arab Emirates, the United Kingdom and the United States, as well as six IAEA staff members. 'The IRRS mission and preparation for it was a unique occasion that involved the whole organization, provided motivation for improvement of the safety framework in Finland and assists STUK review its mission', said Tero Varjoranta, Director General of STUK. The IRRS team identified a number of good practices and achievements, including: - STUK's excellence in its safety assessment of nuclear power plants and waste repositories, in particular its demonstration that long-term political commitment is a necessity to sustain the creation of a waste repository as well as its regulatory oversight of medical applications of radiation sources; and - STUK's excellent record in

  13. IAEA Operational Safety Team Reviews Cattenom Nuclear Power Plant

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts led by the International Atomic Energy Agency (IAEA) has reviewed operational safety at France's Cattenom Nuclear Power Plant (NPP) noting a series of good practices as well as recommendations and suggestions to reinforce them. The IAEA assembled an international team of experts at the request of the Government of France to conduct an Operational Safety Review (OSART) of Cattenom NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 14 November to 1 December 2011. The team was made up of experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Japan, Russia, Slovakia, South Africa, Sweden, Ukraine, the United Kingdom and the IAEA. The team at Cattenom conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; Emergency Planning and Preparedness; and Severe Accident Management. Cattenom is the first plant in Europe to voluntarily undertake a Severe Accident Management review during an OSART review. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: Sheets are displayed in storage areas where combustible material is present - these sheets are updated readily and accurately by the area owner to ensure that the fire limits are complied with; A simple container is attached to the neutron source handling device to ensure ease and safety of operations and reduce possible radiation exposure during use

  14. A Systematic Review of Tools Used to Assess Team Leadership in Health Care Action Teams.

    Science.gov (United States)

    Rosenman, Elizabeth D; Ilgen, Jonathan S; Shandro, Jamie R; Harper, Amy L; Fernandez, Rosemarie

    2015-10-01

    To summarize the characteristics of tools used to assess leadership in health care action (HCA) teams. HCA teams are interdisciplinary teams performing complex, critical tasks under high-pressure conditions. The authors conducted a systematic review of the PubMed/MEDLINE, CINAHL, ERIC, EMBASE, PsycINFO, and Web of Science databases, key journals, and review articles published through March 2012 for English-language articles that applied leadership assessment tools to HCA teams in all specialties. Pairs of reviewers assessed identified articles for inclusion and exclusion criteria and abstracted data on study characteristics, tool characteristics, and validity evidence. Of the 9,913 abstracts screened, 83 studies were included. They described 61 team leadership assessment tools. Forty-nine tools (80%) provided behaviors, skills, or characteristics to define leadership. Forty-four tools (72%) assessed leadership as one component of a larger assessment, 13 tools (21%) identified leadership as the primary focus of the assessment, and 4 (7%) assessed leadership style. Fifty-three studies (64%) assessed leadership at the team level; 29 (35%) did so at the individual level. Assessments of simulated (n = 55) and live (n = 30) patient care events were performed. Validity evidence included content validity (n = 75), internal structure (n = 61), relationship to other variables (n = 44), and response process (n = 15). Leadership assessment tools applied to HCA teams are heterogeneous in content and application. Comparisons between tools are limited by study variability. A systematic approach to team leadership tool development, evaluation, and implementation will strengthen understanding of this important competency.

  15. International Expert Team Concludes IAEA Peer Review of Bulgaria's Regulatory Framework for Nuclear and Radiation Safety

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: An international team of senior nuclear safety and radiation protection experts today concluded a 12-day mission to review the regulatory framework for nuclear and radiation safety in Bulgaria. The Integrated Regulatory Review Service (IRRS) mission, conducted at the request of the Government of Bulgaria, identified a series of good practices and made recommendations to help enhance the overall performance of the regulatory system. IRRS missions, which were initiated in 2006, are peer reviews based on the IAEA Safety Standards; they are not inspections or audits. ''Bulgaria has a clear national policy and strategy for safety, which are well in line with international standards and practices and contribute to a high level of nuclear safety,'' said Mission Team Leader Marta Ziakova, Chairperson of the Nuclear Regulatory Authority of the Slovak Republic. The mission team, which conducted the review from 8 to 19 April, was made up of 16 senior regulatory experts from 16 nations, and six IAEA staff. ''The results of the IRRS mission will be valuable for the future development and reinforcement of the Bulgarian Nuclear Safety Agency (BNRA). The use of international standards and good practices helps to improve global harmonization in all areas of nuclear safety and radiation protection,'' said Sergey Tzotchev, Chairman of the BNRA. Among the main observations in its preliminary report, the IRRS mission team found that BNRA operates as an independent regulatory body and conducts its regulatory processes in an open and transparent manner. In line with the IAEA Action Plan on Nuclear Safety, the mission reviewed the regulatory implications for Bulgaria of the March 2011 accident at TEPCO's Fukushima Daiichi Nuclear Power Station in Japan. It found that the BNRA's response to the lessons learned from that accident was both prompt and effective. Strengths and good practices identified by the IRRS team include the following: A no-blame policy is enshrined in law for

  16. IAEA Operational Safety Team Reviews Saint-Alban Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed safety practices at France's Saint-Alban Nuclear Power Plant (NPP) and has highlighted a set of strong practices as well as a series of recommendations to reinforce them. The IAEA assembled the team at the request of the Government of France to conduct an Operational Safety Review (OSART) of the Saint-Alban NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review from 20 September to 6 October 2010. The team was made up of experts from Belgium, Canada, the Czech Republic, Germany, Lithuania, the Netherlands, Slovakia, Sweden and the USA. An OSART mission is designed to review programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Saint-Alban conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely are under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: A safety guideline for outages; The use of remote video surveillance of fuel inspection and handling activities; A motivational tool for plant staff regarding the benefits of operating experience and associated corrective actions; and Use of a sophisticated key control system

  17. IAEA Operational Safety Team Review Bohunice Nuclear Power Plant, Slovak Republic

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed Slovakia's Bohunice Nuclear Power Plant (BNPP) for its safety practices and has noted a series of good practices as well as recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of Slovak Republic to conduct an Operational Safety Review (OSART) of Bohunice NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the OSART team performed an in-depth operational safety review from 1 to 18 November 2010. The team was made up of experts from Belgium, Canada, China, the Czech Republic, France, Sweden, the United Kingdom and the IAEA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at BNPP conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely is under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. Long Term Operation assessment has been requested by the plant in addition to the standard OSART program. The OSART team has identified good plant practices which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: BNPP has implemented a comprehensive set of technical and organizational measures which have significantly reduced the production of liquid radioactive waste; BNPP has developed an automatic transfer of dosimetry data

  18. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  19. Individual and team performance in team-handball: a review.

    Science.gov (United States)

    Wagner, Herbert; Finkenzeller, Thomas; Würth, Sabine; von Duvillard, Serge P

    2014-12-01

    Team handball is a complex sport game that is determined by the individual performance of each player as well as tactical components and interaction of the team. The aim of this review was to specify the elements of team-handball performance based on scientific studies and practical experience, and to convey perspectives for practical implication. Scientific studies were identified via data bases of PubMed, Web of Knowledge, SPORT Discus, Google Scholar, and Hercules. A total of 56 articles met the inclusion criteria. In addition, we supplemented the review with 13 additional articles, proceedings and book sections. It was found that the specific characteristics of team-handball with frequent intensity changes, team-handball techniques, hard body confrontations, mental skills and social factors specify the determinants of coordination, endurance, strength and cognition. Although we found comprehensive studies examining individual performance in team-handball players of different experience level, sex or age, there is a lack of studies, particularly for team-handball specific training, as well as cognition and social factors. Key PointsThe specific characteristics of team-handball with frequent intensity changes, specific skills, hard body confrontations, mental skills and social factors define the determinants of coordination, endurance, strength and cognition.To increase individual and team performance in team-handball specific training based on these determinants have been suggested.Although there are comprehensive studies examining individual performance in team-handball players of different experience level, sex, or age are published, there is a lack of training studies, particularly for team-handball specific techniques and endurance, as well as cognition and social factors.

  20. Challenges associated with knowledge sharing in international product development teams

    DEFF Research Database (Denmark)

    Sonne, Anne-Mette; Harmsen, Hanne

    on product development teams, knowledge sharing, and international product development management to form a conceptual framework of factors that influence knowledge sharing in international teams. Four in-depth case studies are used to explore and expand the understanding of the challenges associated...... with international product development teams. Results indicate that international product development might not be as international as would be expected and that even if many of the characteristics and problems associated with international product development in the literature are found, there are also a number...

  1. Measuring cognition in teams: a cross-domain review.

    Science.gov (United States)

    Wildman, Jessica L; Salas, Eduardo; Scott, Charles P R

    2014-08-01

    The purpose of this article is twofold: to provide a critical cross-domain evaluation of team cognition measurement options and to provide novice researchers with practical guidance when selecting a measurement method. A vast selection of measurement approaches exist for measuring team cognition constructs including team mental models, transactive memory systems, team situation awareness, strategic consensus, and cognitive processes. Empirical studies and theoretical articles were reviewed to identify all of the existing approaches for measuring team cognition. These approaches were evaluated based on theoretical perspective assumed, constructs studied, resources required, level of obtrusiveness, internal consistency reliability, and predictive validity. The evaluations suggest that all existing methods are viable options from the point of view of reliability and validity, and that there are potential opportunities for cross-domain use. For example, methods traditionally used only to measure mental models may be useful for examining transactive memory and situation awareness. The selection of team cognition measures requires researchers to answer several key questions regarding the theoretical nature of team cognition and the practical feasibility of each method. We provide novice researchers with guidance regarding how to begin the search for a team cognition measure and suggest several new ideas regarding future measurement research. We provide (1) a broad overview and evaluation of existing team cognition measurement methods, (2) suggestions for new uses of those methods across research domains, and (3) critical guidance for novice researchers looking to measure team cognition.

  2. Incorporating Library School Interns on Academic Library Subject Teams

    Science.gov (United States)

    Sargent, Aloha R.; Becker, Bernd W.; Klingberg, Susan

    2011-01-01

    This case study analyzes the use of library school interns on subject-based teams for the social sciences, humanities, and sciences in the San Jose State University Library. Interns worked closely with team librarians on reference, collection development/management, and instruction activities. In a structured focus group, interns reported that the…

  3. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  4. The SKI SITE-94 Project: An International Peer Review Carried out by an OECD/NEA Team of Experts

    International Nuclear Information System (INIS)

    Sagar, Budhi; Devillers, C.; Smith, Paul; Laliuex, P.; Pescatore, C.

    1997-10-01

    The recently completed SITE-94 project is an SKI effort directed at building competence and capacity in the assessment of safety of a spent-fuel geologic repository. Emphasis is given to the assimilation of site-specific data, with its associated uncertainties, into the performance assessment. Specific attention is also given to improving the understanding of mechanisms that might compromise canister integrity. This report represents the common views of an International Review Team (IRT) established by the NEA Secretariat, at the request of SKI, to perform a peer review of SITE-94. The basis for the report is the understanding of SITE-94 and its background obtained by IRT in the course of several months of study of SITE-94 documentation, internal discussions and a meeting with SKI in Stockholm. The report is limited to the main findings of IRT. The intended audience of the report is the staff of SKI and, accordingly, the style of the report is suited to a technical audience familiar with the contents of the SITE-94 project

  5. The impact of team characteristics and context on team communication: An integrative literature review.

    Science.gov (United States)

    Tiferes, Judith; Bisantz, Ann M

    2018-04-01

    Many studies on teams report measures of team communication; however, these studies vary widely in terms of the team characteristics, situations, and tasks studied making it difficult to understand impacts on team communication more generally. The objective of this review is systematically summarize relationships between measures of team communication and team characteristics and situational contexts. A literature review was conducted searching in four electronic databases (PsycINFO, MEDLINE, Ergonomics Abstracts, and SocINDEX). Additional studies were identified by cross-referencing. Articles included for final review had reported at least one team communication measure associated with some team and/or context dimension. Ninety-nine of 727 articles met the inclusion criteria. Data extracted from articles included characteristics of the studies and teams and the nature of each of the reported team and/or context dimensions-team communication properties relationships. Some dimensions (job role, situational stressors, training strategies, cognitive artifacts, and communication media) were found to be consistently linked to changes in team communication. A synthesized diagram that describes the possible associations between eleven team and context dimensions and nine team communication measures is provided along with research needs. Copyright © 2017 Elsevier Ltd. All rights reserved.

  6. IAEA-led Operational Safety Team Reviews Dukovany Nuclear Power Plant, Czech Republic

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has commended the Dukovany Nuclear Power Plant (NPP) in the Czech Republic for its safety practices and has also made a series of recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of the Czech Republic to conduct an Operational Safety Review (OSART) of Dukovany NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 6 to 23 June 2011. The team was made up of experts from Armenia, Germany, Hungary, Romania, Slovenia, Sweden, the UK and the USA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Dukovany conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: The plant uses an integrated approach to recruit, select, psychologically assess and train new employees. This approach has resulted in consistently high success rates for licensed operator examinations and the identification of potential candidates for various plant departments; The performance

  7. Team of experts concludes review of safety issues at Temelin

    International Nuclear Information System (INIS)

    2001-01-01

    Full text: At the request of the Czech Government, the International Atomic Energy Agency (IAEA) assembled a team of national experts from Bulgaria, France, Germany, Spain, and the United Kingdom, with an observer from Austria, to review safety issues at the Temelin power plant that were identified in 1996 as relevant to reactors of the generic Temelin design (WWER-1000/320 type). Following a detailed on-site review from 18 to 23 November 2001, the experts concluded that most identified issues had been addressed and resolved. Work is continuing on the few remaining issues. These issues, however, are not judged by them to be significant and would not from the experts' standpoint preclude the safe operation of the Temelin nuclear power plant. The final report of the team of experts will be available to the Czech Government in one month's time. (author)

  8. NEA international peer reviews of post-accident protection policy

    International Nuclear Information System (INIS)

    Lazo, T.

    2011-01-01

    For many years, the NEA has offered international peer reviews of national, high-level radioactive waste management policies and approaches. Until recently, this service had not been requested in the area of radiological protection. However, the 3. International Nuclear Emergency Exercise (INEX-3, 2005-2006) addressed post-accident consequence management for the first time in a broad, international sense, and helped generate significant national reflections in this area. In particular, in 2005 the French government began an extensive programme of post-emergency consequence management planning, resulting in a draft national policy to address such situations. The Finnish government used the INEX-3 exercise as a vehicle to discuss post-emergency consequence management with a broad group of governmental and private stakeholders, and also began to develop national policy in this area. In order to further refine national efforts, the French Nuclear Safety Authority (ASN) invited the NEA to perform in April 2011 its first international peer review in the radiological protection area focusing on its post-emergency consequence management policy under development. Finnish experts participated in this peer review team, and as a result, subsequently invited the NEA to perform an international peer review of its developing policy in this area in September 2011. These draft national policies and their international peer reviews are briefly presented in this paper. Feedback from both the French ASN and the Finnish STUK suggests that the detailed, external input provided by the international peer review teams have been extremely valuable in refining the content of the guides so that they are more clear, concise, understandable and implementable. It should be recalled that both national policy documents reviewed are far more detailed and extensive than described here. The intent of this article was not to provide a review of the national policies themselves, but rather to give an

  9. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M HILL Hanford's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  10. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M Hill Hanford Group's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  11. International Team Identifies Biomarker for Scleroderma

    Science.gov (United States)

    ... Spotlight on Research International Team Identifies Biomarker for Scleroderma By Kirstie Saltsman, Ph.D. | May 5, 2014 ... molecule correlates with a more severe form of scleroderma, a chronic autoimmune disorder that involves the abnormal ...

  12. Performance factors in women's team handball: physical and physiological aspects--a review.

    Science.gov (United States)

    Manchado, Carmen; Tortosa-Martínez, Juan; Vila, Helena; Ferragut, Carmen; Platen, Petra

    2013-06-01

    Team handball is an Olympic sport played professionally in many European countries. Nevertheless, a scientific knowledge regarding women's elite team handball demands is limited. Thus, the purpose of this article was to review a series of studies (n = 33) on physical characteristics, physiological attributes, physical attributes, throwing velocity, and on-court performances of women's team handball players. Such empirical and practical information is essential to design and implement successful short-term and long-term training programs for women's team handball players. Our review revealed that (a) players that have a higher skill level are taller and have a higher fat-free mass; (b) players who are more aerobically resistant are at an advantage in international level women team handball; (c) strength and power exercises should be emphasized in conditioning programs, because they are associated with both sprint performance and throwing velocity; (d) speed drills should also be implemented in conditioning programs but after a decrease in physical training volume; (e) a time-motion analysis is an effective method of quantifying the demands of team handball and provides a conceptual framework for the specific physical preparation of players. According to our results, there are only few studies on on-court performance and time-motion analysis for women's team handball players, especially concerning acceleration profiles. More studies are needed to examine the effectiveness of different training programs of women's team handball players' physiological and physical attributes.

  13. IAEA Operational Safety Team (OSART) Reviews Progress at Fessenheim Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has evaluated the French Nuclear Power Plant (NPP) at Fessenheim to assess how the facility has followed up on an Operational Safety Review Team (OSART) mission undertaken in 2009. The IAEA assembled a team of experts at the request of the Government of France to conduct the mission. Follow-up missions are standard components of the OSART programme and are conducted 18-24 months after the initial OSART mission. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the team performed its review from 7 to 11 February 2011. The team assessed how the Fessenheim NPP has addressed the recommendations and suggestions made during the 2009 OSART mission. The team was made up of experts from Slovakia, Switzerland and the IAEA. The review covered the areas of Management, Organization and Administration; Training and Qualifications; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. The conclusions of the follow-up review are based on the IAEA's Safety Standards and proven good international practices. There were 21 issues raised by the 2009 mission. During the follow-up mission, the team assessed that six issues had been resolved, thirteen had made satisfactory progress to date and two had made insufficient progress to date. 'Resolved' describes action plans for improvement that have been fully implemented; 'satisfactory progress to date' describes action plans that have been developed but are not yet fully implemented; and 'insufficient progress to date' describes situations where additional consideration or strengthening of improvement plans is necessary. Examples of issues falling into different resolution categories include: The plant has resolved the suggestion to establish a process to review initial training materials on a regular basis

  14. Managing Virtual Product Development team: A Review

    Directory of Open Access Journals (Sweden)

    Amir Mohammad Colabi

    2014-05-01

    Full Text Available Although there are many potential benefits associated with the use of virtual product development teams, exploiting these benefits requires an appropriate management. Managing virtual product development team is a critical issue as many of these teams fail to accomplish their goals. Review of previous literature shows that body of knowledge in managing virtual product development teams is fragmented and inconsistent. The main objective of this paper is to categorize the previous research on the subject of virtual product development team management in order to integrate the research into a thematic model and to enable recommendations for future research. So, this study reviews and summarizes empirical research in the field, also conceptual and qualitative papers, experiences, reports and explorative case studies. Results show that there are three fields of research in this area, including: Virtual production and Virtual team in Product Development, Managing virtual team in R&D[1] and product development, Managing global virtual product development teams. In order to organize previous studies in this area, a thematic map is proposed which shows the structure and sequence of research. Finally, a comprehensive discussion on the future directions in this field is proposed.

  15. High-Intensity Events in International Women's Team Handball Matches.

    Science.gov (United States)

    Luteberget, Live S; Spencer, Matt

    2017-01-01

    International women's team handball is a physically demanding sport and is intermittent in nature. The aim of the study was to profile high-intensity events (HIEs) in international women's team handball matches with regard to playing positions. Twenty female national-team handball players were equipped with inertial movement units (OptimEye S5, Catapult Sports, Australia) in 9 official international matches. Players were categorized in 4 different playing positions: backs, wings, pivots, and goalkeepers (GKs). PlayerLoad™, accelerations (Acc), changes of direction (CoD), decelerations (Dec), and the sum of the latter 3, HIEs, were extracted from raw-data files using the manufacturer's software. All Acc, Dec, CoD, and HIEs >2.5 m/s were included. Data were log-transformed and differences were standardized for interpretation of magnitudes and reported with effect-size statistics. Mean numbers of events were 0.7 ± 0.4 Acc/min, 2.3 ± 0.9 Dec/min, and 1.0 ± 0.4 CoD/min. Substantial differences between playing positions, ranging from small to very large, were found in the 3 parameters. Backs showed a most likely greater frequency for HIE/min (5.0 ± 1.1 HIE/min) than all other playing positions. Differences between playing positions were also apparent in PlayerLoad/min. HIEs in international women's team handball are position specific, and the overall intensity depends on the positional role within a team. Specific HIE and intensity profiles from match play provide useful information for a better understanding of the overall game demands and for each playing position.

  16. Organization of the ITER Co-ordinated Technical Activities International Team

    International Nuclear Information System (INIS)

    2001-01-01

    At its meeting in Toronto on 7 November 2001, the ITER Co-ordinated Technical Activities (CTA) project board took note of the organizational arrangements for the CTA International Team at the Garching and Naka joint work sites. The organization chart of the team remains almost unchanged from that of the ITER Engineering Design Activities (EDA). However, there is no special division responsible for plasma and field control. Activities in plasma control will be taken over by the Physics Unit. This newsletter also includes the ITER CTA International Team structure

  17. The international INTRAVAL project. Summary and conclusions by the TVO/VTT Team

    International Nuclear Information System (INIS)

    Hautojaervi, A.

    1994-12-01

    Teollisuuden Voima Oy (TVO) participated the international cooperation project INTRAVAL and VTT Energy acted as a project team. The Finnish participation focused on flow and transport in crystalline fractured rock and six test cases out of thirteen were tackled. The experimental results were evaluated mainly by means of analytical transport models. The report presents a short review of the experience obtained in the course of the project. It concentrates on the issues revealed in the discussions and analyses of the six test cases in which the TVO/VTT team actively participated but some of the conclusions are even more general in nature. Some suggestions are made for future experimental and theoretical work in the field of geosphere. (15 refs., 2 tabs.)

  18. Team Work in International Programs: Why is it so difficult?

    DEFF Research Database (Denmark)

    Lauridsen, Karen M.; Madsen, Henning

    intercultural collaboration. The issues that arise seem to be grounded in linguistic, cultural and educational factors. This paper reports on and discusses a study of student responses to intercultural collaboration (in English) in two programmes at Aarhus University, Denmark. One conclusion...... is that the international students are more prepared to work in multicultural teams than their Danish peers. Another one tells us that once students have experience with the diversity of these teams, at least some of them become more open towards working in such teams in the future. It is interesting to discuss......Team Work in International Programs: Why is it so difficult? And what can we do about it? It is common knowledge that students often find it difficult to collaborate on assignments, projects, etc., but we require that they do so for a number of reasons, e.g. to learn how to work in teams or take...

  19. Assessing the facilitators and barriers of interdisciplinary team working in primary care using normalisation process theory: An integrative review.

    Science.gov (United States)

    O'Reilly, Pauline; Lee, Siew Hwa; O'Sullivan, Madeleine; Cullen, Walter; Kennedy, Catriona; MacFarlane, Anne

    2017-01-01

    Interdisciplinary team working is of paramount importance in the reform of primary care in order to provide cost-effective and comprehensive care. However, international research shows that it is not routine practice in many healthcare jurisdictions. It is imperative to understand levers and barriers to the implementation process. This review examines interdisciplinary team working in practice, in primary care, from the perspective of service providers and analyses 1 barriers and facilitators to implementation of interdisciplinary teams in primary care and 2 the main research gaps. An integrative review following the PRISMA guidelines was conducted. Following a search of 10 international databases, 8,827 titles were screened for relevance and 49 met the criteria. Quality of evidence was appraised using predetermined criteria. Data were analysed following the principles of framework analysis using Normalisation Process Theory (NPT), which has four constructs: sense making, enrolment, enactment, and appraisal. The literature is dominated by a focus on interdisciplinary working between physicians and nurses. There is a dearth of evidence about all NPT constructs apart from enactment. Physicians play a key role in encouraging the enrolment of others in primary care team working and in enabling effective divisions of labour in the team. The experience of interdisciplinary working emerged as a lever for its implementation, particularly where communication and respect were strong between professionals. A key lever for interdisciplinary team working in primary care is to get professionals working together and to learn from each other in practice. However, the evidence base is limited as it does not reflect the experiences of all primary care professionals and it is primarily about the enactment of team working. We need to know much more about the experiences of the full network of primary care professionals regarding all aspects of implementation work. International

  20. Assessing the facilitators and barriers of interdisciplinary team working in primary care using normalisation process theory: An integrative review

    Science.gov (United States)

    O’Reilly, Pauline; Lee, Siew Hwa; O’Sullivan, Madeleine; Cullen, Walter; Kennedy, Catriona; MacFarlane, Anne

    2017-01-01

    Background Interdisciplinary team working is of paramount importance in the reform of primary care in order to provide cost-effective and comprehensive care. However, international research shows that it is not routine practice in many healthcare jurisdictions. It is imperative to understand levers and barriers to the implementation process. This review examines interdisciplinary team working in practice, in primary care, from the perspective of service providers and analyses 1 barriers and facilitators to implementation of interdisciplinary teams in primary care and 2 the main research gaps. Methods and findings An integrative review following the PRISMA guidelines was conducted. Following a search of 10 international databases, 8,827 titles were screened for relevance and 49 met the criteria. Quality of evidence was appraised using predetermined criteria. Data were analysed following the principles of framework analysis using Normalisation Process Theory (NPT), which has four constructs: sense making, enrolment, enactment, and appraisal. The literature is dominated by a focus on interdisciplinary working between physicians and nurses. There is a dearth of evidence about all NPT constructs apart from enactment. Physicians play a key role in encouraging the enrolment of others in primary care team working and in enabling effective divisions of labour in the team. The experience of interdisciplinary working emerged as a lever for its implementation, particularly where communication and respect were strong between professionals. Conclusion A key lever for interdisciplinary team working in primary care is to get professionals working together and to learn from each other in practice. However, the evidence base is limited as it does not reflect the experiences of all primary care professionals and it is primarily about the enactment of team working. We need to know much more about the experiences of the full network of primary care professionals regarding all aspects

  1. 7 CFR 4290.360 - Initial review of Applicant's management team's qualifications.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Initial review of Applicant's management team's...'s management team's qualifications. The Secretary will review the information submitted by the Applicant concerning the qualifications of the Applicant's management team to determine in his or her sole...

  2. Spanish adaptation of the internal functioning of the Work Teams Scale (QFI-22).

    Science.gov (United States)

    Ficapal-Cusí, Pilar; Boada-Grau, Joan; Torrent-Sellens, Joan; Vigil-Colet, Andreu

    2014-05-01

    The aim of this article is to develop the Spanish adaptation of the internal functioning of Work Teams Scale (QFI-22). The scale was adapted from the French version, and was applied to a sample of 1,055 employees working for firms operating in Spain. The article analyses the internal structure (exploratory and confirmatory factor analysis) and internal consistency, and provides convergent validity evidence of the scale. The QFI-22 scale shows the same internal structure as the original. Factor analysis confirmed the existence of two factors: interpersonal support and team work management, with good internal consistency coefficients (α1 = .93, α2 = .92). Regarding validity evidence, the QFI-22 scale has significant correlations with other correlates and alternative scales used for comparison purposes. The two factors correlated positively with team vision, participation safety, task orientation and support for innovation (Team Climate Inventory, TCI scale), with progressive culture (Organisational Culture, X-Y scale), and with creating change, customer focus and organisational learning (Denison Organizational Culture Survey, DOCS scale). In contrast, the two factors correlated negatively with traditional culture (X-Y scale). The QFI-22 scale is a useful instrument for assessing the internal functioning of work teams.

  3. The Creation and Operation of Internal High Performance Modern Enterprises Team

    Institute of Scientific and Technical Information of China (English)

    Shengyu WANG

    2015-01-01

    The future of enterprises mainly depends on product research and development. For the modern enterprises, high performance project team is the most important means of R & D projects. According to the interviews and survey found of a plurality of enterprise project R & D team. the internal high performance team of modern business is good or bad, its key lies in whether the team managers for the team creation and management is in place, this is the most difficult place for the high performance team management system, especially the team leadership. Based on this, this paper discusses on the creation and management of high performance modern enterprise team, aiming to provide valuable reference for the enterprise team management.

  4. International BBQ Team / Triin-Liis Härma

    Index Scriptorium Estoniae

    Härma, Triin-Liis

    2012-01-01

    Austraalias 2011. aastal loodud International BBQ Team'ist, mis tutvustab austraallastele erinevaid grillimisvõimalusi ning kus oma oskusi ja teadmisi jagab ka Eestis ja Inglismaal tegutsev liha/grilli/BBQ koolitaja, Eesti Grillfesti BBQ ja grillvõistluste korraldaja ning peakohtunik Enn Tobreluts, administratiivse poolega toetab Triin-Liis Härma

  5. Creating Value through Virtual Teams: A Current Literature Review

    Directory of Open Access Journals (Sweden)

    Akemi Takeoka Chatfield

    2014-11-01

    Full Text Available Globally, virtual teams (VT as ICT-enabled emergent network organisation forms have gained international validity by innovative organisations, with a corresponding surge of interest in understanding how organisations can leverage VT to create business value. Despite growing deliberations in VT literature on managing VT, tasks and outcomes, however, creating business value through VT remains an unresolved theoretical and pragmatic conundrum. A review of prior relevant literature is essential to advancing knowledge. The paucity of published review articles seems to have impeded the field’s accumulation of VT knowledge. This research, therefore, reviews the current literature on case studies of VT to address the question: What are organisational challenges in creating business value through VT in the organisation? The key challenges found in the literature are effective communication, knowledge sharing, trust, and interpersonal skills in the new virtual boundary-less environment. Drawing on the IT business value model, we also discuss their resource-based implications.

  6. Review on the administration and effectiveness of team-based learning in medical education.

    Science.gov (United States)

    Hur, Yera; Cho, A Ra; Kim, Sun

    2013-12-01

    Team-based learning (TBL) is an active learning approach. In recent years, medical educators have been increasingly using TBL in their classes. We reviewed the concepts of TBL and discuss examples of international cases. Two types of TBL are administered: classic TBL and adapted TBL. Combining TBL and problem-based learning (PBL) might be a useful strategy for medical schools. TBL is an attainable and efficient educational approach in preparing large classes with regard to PBL. TBL improves student performance, team communication skills, leadership skills, problem solving skills, and cognitive conceptual structures and increases student engagement and satisfaction. This study suggests recommendations for administering TBL effectively in medical education.

  7. Cross-functional Sourcing Teams – A Purchasing and Supply Management Literature Review

    DEFF Research Database (Denmark)

    Hansen, Anders Peder Lysholm

    2014-01-01

    This paper presents a systematic literature review of scientific papers on cross-functional sourcing teams in top journals within Purchasing and Supply Management. The review identifies four common research topics within the field; Determining factors of sourcing team success, Performance...... management/goals of sourcing teams, Behavior and decisions in sourcing teams and Involvement of purchasing in sourcing teams. Further research on Performance Management and how to create a holistic, teams based perspective in cross-functional sourcing teams is suggested....

  8. IAEA Expert Team Completes Mission to Review Japan's Nuclear Power Plant Safety Assessment Process, 31 January 2012, Tokyo, Japan

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: A team of international nuclear safety experts today completed a review of Japan's two-stage process for assessing nuclear safety at the nation's nuclear power plants. The team began its work on 23 January and delivered a Preliminary Summary Report to Japanese officials today and plans to finish the final report by the end of February. National safety assessments and their peer review by the IAEA are a key component of the IAEA's Action Plan on Nuclear Safety, which was approved by the Agency's 152 Member States following last year's nuclear accident at Fukushima Daiichi Nuclear Power Station. At the request of the Government of Japan, the International Atomic Energy Agency (IAEA) organized a 10-person team to review the Japanese Nuclear and Industrial Safety Agency's (NISA) approach to the Comprehensive Assessments for the Safety of Existing Power Reactor Facilities and how NISA examines the results submitted by nuclear operators. The IAEA safety review mission consisted of five IAEA and three international nuclear safety experts. To help its review, the team held meetings in Tokyo with officials from NISA, the Japanese Nuclear Energy Safety (JNES) Organization, and the Kansai Electric Power Company (KEPCO), and the team visited the Ohi Nuclear Power Station to see an example of how Japan's Comprehensive Safety Assessment is being implemented by nuclear operators. 'We concluded that NISA's instructions to power plants and its review process for the Comprehensive Safety Assessments are generally consistent with IAEA Safety Standards', said team leader James Lyons, director of the IAEA's Nuclear Installation Safety Division. In its Preliminary Summary Report delivered today, the team highlighted a number of good practices and identified some improvements that would enhance the overall effectiveness of the Comprehensive Safety Assessment process. Good practices identified by the mission team include: Based on NISA instructions and commitments of the

  9. IAEA Team Reviews Safety Progress at French Nuclear Power Plant 19-23 May 2014

    International Nuclear Information System (INIS)

    2014-01-01

    An international team of nuclear installation safety experts led by the International Atomic Energy Agency (IAEA) has evaluated the Gravelines Nuclear Power Plant (NPP) in France to assess how the station has followed up on an Operational Safety Review Team (OSART) mission undertaken in 2012. The IAEA assembled a team of experts at the request of the Government of France to conduct the follow-up OSART mission at Gravelines NPP from 19 to 23 May 2014. Follow-up missions are standard components of the OSART programme; they are typically conducted 15-24 months after the initial OSART mission. The IAEA mission in 2012 made a number of recommendations and suggestions for consideration by the Gravelines NPP operators. The station thoroughly analyzed the OSART recommendations and suggestions and developed corrective action plans. In 18 months, the Gravelines plant has achieved the level ''resolved;; or ''satisfactory progress'' in almost all of the recommendations and suggestions made by the OSART in November 2012. During the follow-up mission, the team assessed that the operators have resolved the issues in several areas, including: Undertaking initiatives to improve fire prevention; Reinforcing contamination control practices; and Enhancing capabilities to protect emergency workers in the event of a release of radioactivity. The team identified some issues which have achieved satisfactory progress toward resolution, but need further work, including: Further improvement of measures to preventing the ingress of items or chemicals into circuits and equipment; Comprehensive application of the corrective actions programme; and Reinforcement of the containment protection system in the event of an extremely adverse situation. The team identified the following issue as one which has made insufficient progress toward resolution and needs further work: Emergency response arrangements do not follow current IAEA safety standards recommending that the plant should have a person on

  10. Collective (Team) Learning Process Models: A Conceptual Review

    Science.gov (United States)

    Knapp, Randall

    2010-01-01

    Teams have become a key resource for learning and accomplishing work in organizations. The development of collective learning in specific contexts is not well understood, yet has become critical to organizational success. The purpose of this conceptual review is to inform human resource development (HRD) practice about specific team behaviors and…

  11. Team-Based Professional Development Interventions in Higher Education: A Systematic Review.

    Science.gov (United States)

    Gast, Inken; Schildkamp, Kim; van der Veen, Jan T

    2017-08-01

    Most professional development activities focus on individual teachers, such as mentoring or the use of portfolios. However, new developments in higher education require teachers to work together in teams more often. Due to these changes, there is a growing need for professional development activities focusing on teams. Therefore, this review study was conducted to provide an overview of what is known about professional development in teams in the context of higher education. A total of 18 articles were reviewed that describe the effects of professional development in teams on teacher attitudes and teacher learning. Furthermore, several factors that can either hinder or support professional development in teams are identified at the individual teacher level, at the team level, and also at the organizational level.

  12. International experts conclude IAEA peer review of Iran's safety regulation of Bushehr NPP

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear safety experts today completed an IAEA mission to review the effectiveness of Iran's safety regulation of its first nuclear power plant and to identify possible improvements before the plant begins operation. Upon invitation of the Islamic Republic of Iran, the International Atomic Energy Agency (IAEA) assembled a team of senior regulators from seven Member States for an Integrated Regulatory Review Service (IRRS) mission. The scope of the mission was limited to the safety regulation of Bushehr nuclear power plant (BNPP-1). The IRRS review took place from 20 February to 2 March at the INRA offices in Tehran and included a technical visit to the BNPP-1 site. The mission was an objective peer review based on IAEA safety standards, and was neither an inspection, nor an audit. Ms. Olena Mykolaichuk, IRRS Team Leader and Head of the State Nuclear Regulatory Committee of Ukraine, commended her INRA counterparts: 'The regulatory work performed on the Bushehr construction and in preparation for commissioning has demonstrated significant progress of INRA as a nuclear regulatory authority,' she said. Philippe Jamet, Director of the IAEA's Nuclear Installation Safety Division, added: 'Through this IRRS mission, both Iran and the international experts contribute to the enhancement of nuclear safety and worldwide experience sharing.' In the course of its review the IRRS team identified the following strengths: - INRA has a dedicated, conscientious staff, demonstrating clear commitments to further improvements. - INRA clearly recognizes the value of peer reviews and international cooperation regarding nuclear safety. - Despite a shortage of staff, INRA demonstrated strong leadership while performing both review and assessment and inspection tasks during the BNPP-1 construction and pre-commissioning. - INRA has developed an excellent computerized documentation control system. Recommendations and suggestions to improve INRA's regulatory

  13. Japan's Siting Process for the Geological Disposal of High-level Radioactive Waste - An International Peer Review

    International Nuclear Information System (INIS)

    Brassinnes, Stephane; Fabbri, Olivier; Rubenstone, James; Seppaelae, Timo; Siemann, Michael; ); Kwong, Gloria; )

    2016-01-01

    The Nuclear Energy Agency carried out an independent peer review of Japan's siting process and criteria for the geological disposal of high-level radioactive waste in May 2016. The review concluded that Japan's site screening process is generally in accordance with international practices. As the goal of the siting process is to locate a site - that is both appropriate and accepted by the community - to host a geological disposal facility for high-level radioactive waste, the international review team emphasises in this report the importance of maintaining an open dialogue and interaction between the regulator, the implementer and the public. Dialogue should begin in the early phases and continue throughout the siting process. The international review team also underlines the importance of taking into account feasibility aspects when selecting a site for preliminary investigations, but suggests that it would be inappropriate to set detailed scientific criteria for nationwide screening at this stage. The team has provided extensive advisory remarks in the report as opportunities for improvement, including the recommendation to use clear and consistent terminology in defining the site screening criteria as it is a critical factor in a successful siting process. (authors)

  14. International Nuclear Safety Experts Conclude IAEA Peer Review of Korea's Regulatory System

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of senior nuclear safety experts concluded today a two-week mission to review the regulatory framework for nuclear safety in the Republic of Korea. The team identified good practices and gave advice on areas for future improvements. The IAEA has conveyed the team's main conclusions to the Government of Korea, while the final report will be submitted by the end of summer 2011. At the request of the Korean Government, the IAEA assembled a team of 16 senior regulatory experts from 14 nations to conduct the Integrated Regulatory Review Service (IRRS) mission involving the Korean Ministry for Education, Science and Technology (MEST) and the Korean Institute for Nuclear Safety (KINS). The mission is a peer-review based on the IAEA Safety Standards. ''This was the first IRRS mission organized after Japan's Fukushima Daiichi nuclear accident and it included a review of the regulatory implications of that event,' explains Denis Flory, IAEA Deputy Director General and Head of the Department of Nuclear Safety and Security. William Borchardt, Executive Director of Operations from the US Nuclear Regulatory Commission and Team Leader of this mission commended the Korean authorities for their openness and commitment to sharing their experience with the world's nuclear safety community. ''IRRS missions such as the one that was just concluded here in the Republic of Korea are crucial to the enhancement of nuclear safety worldwide,'' he said. The IRRS team reviewed Korea's current regulatory framework while acknowledging the fact that the country's Government has already decided to establish, as of October 2011, a new independent regulatory body to be called Nuclear Safety Commission (NSC). As a consequence, KINS role will be as a regulatory expert organization reporting to the NSC, while MEST's role will be restricted to promoting the utilization of nuclear energy. The IRRS team identified particular strengths in the Korean regulatory system

  15. A scoping review of crisis teams managing dementia in older people.

    Science.gov (United States)

    Streater, Amy; Coleston-Shields, Donna Maria; Yates, Jennifer; Stanyon, Miriam; Orrell, Martin

    2017-01-01

    Research on crisis teams for older adults with dementia is limited. This scoping review aimed to 1) conduct a systematic literature review reporting on the effectiveness of crisis interventions for older people with dementia and 2) conduct a scoping survey with dementia crisis teams mapping services across England to understand operational procedures and identify what is currently occurring in practice. For the systematic literature review, included studies were graded using the Critical Appraisal Skills Programme checklist. For the scoping survey, Trusts across England were contacted and relevant services were identified that work with people with dementia experiencing a mental health crisis. The systematic literature review demonstrated limited evidence in support of crisis teams reducing the rate of hospital admissions, and despite the increase in number of studies, methodological limitations remain. For the scoping review, only half (51.8%) of the teams had a care pathway to manage crises and the primary need for referral was behavioral or psychological factors. Evidence in the literature for the effectiveness of crisis teams for older adults with dementia remains limited. Being mainly cohort designs can make it difficult to evaluate the effectiveness of the intervention. In practice, it appears that the pathway for care managing crisis for people with dementia varies widely across services in England. There was a wide range of names given to the provision of teams managing crisis for people with dementia, which may reflect the differences in the setup and procedures of the service. To provide evidence on crisis intervention teams, a comprehensive protocol is required to deliver a standardized care pathway and measurable intervention as part of a large-scale evaluation of effectiveness.

  16. International nuclear safety experts conclude IAEA peer review of Canada's regulatory system

    International Nuclear Information System (INIS)

    2009-01-01

    Full text: An international team of nuclear safety experts today completed a two-week IAEA review of the regulatory framework and effectiveness of the Canadian Nuclear Safety Commission (CNSC). The team identified good practices within the system and gave advice on some areas for improvement. The IAEA has conveyed initial findings to Canadian authorities; the final report will be submitted by autumn. The International Atomic Energy Agency (IAEA) assembled a team of nuclear, radiation, and waste safety experts at the request of the Government of Canada, to conduct an Integrated Regulatory Review Service (IRRS) mission. The mission from 31 May to 12 June was a peer review based on IAEA Standards, not an inspection, nor an audit. The scope of the mission included sources, facilities and activities regulated by the CNSC: the operation of nuclear power plants (NPPs), research reactors and fuel cycle facilities; the refurbishment or licensing of new NPPs; uranium mining; radiation protection and environmental protection programmes; and the implementation of IAEA Code of Conduct on Safety and Security of Radioactive Sources. The 21-member team from 13 IAEA States and from the IAEA itself reviewed CNSC's work in all relevant areas: legislative and governmental responsibilities; responsibilities and functions; organization; activities of the regulatory body, including the authorization process, review and assessment, inspection and enforcement, the development of regulations, as well as guides and its the management system of CNSC. The basis for the review was a well-prepared self-assessment by the CNSC, including an evolution of its strengths and proposed actions to improve its regulatory effectiveness. Mr. Shojiro Matsuura, IRRS Team Leader and President of the Japanese Nuclear Safety Research Association, said the team 'was impressed by the extensive preparation at all CNSC staff levels.' 'We identified a number of good practices and made recommendations and suggestions

  17. An international peer review of the biosphere modelling programme of the US Department of Energy's Yucca mountain site characterization project. Report of the IAEA International Review Team

    International Nuclear Information System (INIS)

    2001-04-01

    The United States Department of Energy (DOE) has a project for characterizing the site of a facility for disposing of radioactive waste located at Yucca Mountain Nevada, USA (the Yucca Mountain Site Characterization Project). This Project has developed an approach for assessing the future potential impact of any releases of radionuclides to the biosphere from a potential disposal facility sited at Yucca Mountain The DOE requested the International Atomic Energy Agency (IAEA) to organize an independent international expert review of the assessment methodology being used in its biosphere modelling programme. The IAEA accepted the request in the context of its statutory obligation to provide for the application of its established international standards of safety for the protection of health, at the request of a State, to any of that State's activities in the field of atomic energy. The terms of reference of the peer review were to review the biosphere assessment methodology being used for the total system performance assessment of the potential disposal facility. The main purpose was to analyze critically the proposed rationale and methodology and to identify consistencies and inconsistencies between methods being used in the frame of the Project and those established in international standards or in international programmes such as the IAEA's Biosphere Modelling and Assessment Programme (BIOMASS). This report presents the consensus view of the international experts convened by the IAEA for carrying out the review

  18. A systematic review of team-building interventions in non-acute healthcare settings.

    Science.gov (United States)

    Miller, Christopher J; Kim, Bo; Silverman, Allie; Bauer, Mark S

    2018-03-01

    Healthcare is increasingly delivered in a team-based format emphasizing interdisciplinary coordination. While recent reviews have investigated team-building interventions primarily in acute healthcare settings (e.g. emergency or surgery departments), we aimed to systematically review the evidence base for team-building interventions in non-acute settings (e.g. primary care or rehabilitation clinics). We conducted a systematic review in PubMed and Embase to identify team-building interventions, and conducted follow-up literature searches to identify articles describing empirical studies of those interventions. This process identified 14 team-building interventions for non-acute healthcare settings, and 25 manuscripts describing empirical studies of these interventions. We evaluated outcomes in four domains: trainee evaluations, teamwork attitudes/knowledge, team functioning, and patient impact. Trainee evaluations for team-building interventions were generally positive, but only one study associated team-building with statistically significant improvement in teamwork attitudes/knowledge. Similarly mixed results emerged for team functioning and patient impact. The evidence base for healthcare team-building interventions in non-acute healthcare settings is much less developed than the parallel literature for short-term team function in acute care settings. Only one intervention we identified has been tested in multiple non-acute settings by distinct research teams. Positive findings regarding the utility of team-building interventions are tempered by a lack of control conditions, inconsistency in outcome measures, and high probability of bias. Considering these results alongside the well-recognized costs of poor healthcare teamwork suggests that additional research is sorely needed to develop the evidence base for team-building in non-acute settings.

  19. Book Review: Radiological Conditions in the Dnieper River Basin: Assessment by an International Expert Team and Recommendations for an Action Plan

    International Nuclear Information System (INIS)

    Napier, Bruce A.

    2007-01-01

    This article is a book review of a report from the International Atomic Energy Agency that was prepared by a team of scientists from Belarus, the Russian Federation, and Ukraine as an assessment of radiological contamination of the Dnieper River, which flows through these three countries. The topics covered begin with radioactive sources (actual and potential) including areas affected by the Chernobyl nuclear accident, nuclear power plants along the river and its tributaries, uranium mining and ore processing, radioactive waste storage and disposal sites, and non-power sources, such as medicine, industry, and research. The report continues with an assessment of human exposures to radiation from these sources. An additional area of consideration is radiological 'hot spots' in the region. The report finishes with conclusions and recommendations to the regional governments for a strategic action plan and individual government national plans.

  20. A review of simulation-enhanced, team-based cardiopulmonary resuscitation training for undergraduate students.

    Science.gov (United States)

    Onan, Arif; Simsek, Nurettin; Elcin, Melih; Turan, Sevgi; Erbil, Bülent; Deniz, Kaan Zülfikar

    2017-11-01

    Cardiopulmonary resuscitation training is an essential element of clinical skill development for healthcare providers. The International Liaison Committee on Resuscitation has described issues related to cardiopulmonary resuscitation and emergency cardiovascular care education. Educational interventions have been initiated to try to address these issues using a team-based approach and simulation technologies that offer a controlled, safe learning environment. The aim of the study is to review and synthesize published studies that address the primary question "What are the features and effectiveness of educational interventions related to simulation-enhanced, team-based cardiopulmonary resuscitation training?" We conducted a systematic review focused on educational interventions pertaining to cardiac arrest and emergencies that addressed this main question. The findings are presented together with a discussion of the effectiveness of various educational interventions. In conclusion, student attitudes toward interprofessional learning and simulation experiences were more positive. Research reports emphasized the importance of adherence to established guidelines, adopting a holistic approach to training, and that preliminary training, briefing, deliberate practices, and debriefing should help to overcome deficiencies in cardiopulmonary resuscitation training. Copyright © 2017 Elsevier Ltd. All rights reserved.

  1. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  2. Travel medicine advice to UK based international motor sport teams.

    Science.gov (United States)

    Walters, A

    2000-01-01

    International motor sport teams travel extensively. Over the years, the design and build of racing cars has improved so that morbidity and mortality in motor sport has been lessened. Those team members supporting the competitors need to be physically and mentally fit to perform complicated tasks, despite having traveled. This group of travelers has not been studied to any extent previously. An anonymous questionnaire asking some basic travel medicine related questions was distributed to the support team members of a Rally team, and Formula One Grand Prix team. Both teams were based in the UK, and competed in all the rounds of their respective world championships. Ten Rally team members and 18 Formula One team members responded to the questionnaire. The results showed moderate coverage of commonly used vaccinations; appropriate use of antimalarials and insect repellents, but by no means by all team members; little or no problems with traveler's diarrhea; some tendencies to problems related to jet lag, but no real attempt to prevent the problem; and finally some attempt at skin protection against solar damage. Support teams are reasonably well prepared for the combination of, the rigors of frequent travel, and a demanding job. There is a deficit in vaccine coverage, especially of both hepatitis A and B, some education is needed in preventing skin problems later in life due to sun exposure, and further study of jet lag and its implications might be appropriate.

  3. International Nuclear Safety Experts Conclude IAEA Peer Review of Swiss Regulatory Framework

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: A team of international nuclear safety experts today completed a two-week International Atomic Energy Agency (IAEA) review of the regulatory framework for nuclear safety in Switzerland. The Integrated Regulatory Review Service (IRRS) mission noted good practices in the Swiss system and also made recommendations for the nation's nuclear regulatory authority, the Swiss Federal Nuclear Safety Inspectorate (ENSI). ''Our team developed a good impression of the independent Swiss regulator - ENSI - and the team considered that ENSI deserves particular credit for its actions to improve Swiss safety capability following this year's nuclear accident in Japan,'' said IRRS Team Leader Jean-Christophe Niel of France. The mission's scope covered the Swiss nuclear regulatory framework for all types of nuclear-related activities regulated by ENSI. The mission was conducted from 20 November to 2 December, mainly at ENSI headquarters in Brugg. The team held extensive discussions with ENSI staff and visited many Swiss nuclear facilities. IRRS missions are peer reviews, not inspections or audits, and are conducted at the request of host nations. For the Swiss review, the IAEA assembled a team of 19 international experts from 14 countries. The experts came from Belgium, Brazil, the Czech Republic, Finland, France, Germany, Italy, the Republic of Korea, Norway, Russia, Slovakia, Sweden, the United Kingdom, and the United States. ''The findings of the IRRS mission will help us to further improve our work. That is part of our safety culture,'' said ENSI Director General Hans Wanner. ''As Switzerland argued at international nuclear safety meetings this year for a strengthening of the international monitoring of nuclear power, we will take action to fulfil the recommendations.'' The IRRS team highlighted several good practices of the Swiss regulatory system, including the following: ENSI requires Swiss nuclear operators to back-fit their facilities by continuously upgrading

  4. Report of the IPERS (International Peer Review Service) review mission for the Cernavoda nuclear power plant probabilistic safety evaluation (CPSE -PHASE B) in Romania 3 to 14 July 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report presents the results of the IAEA International Peer Review Services review of the internal events Level 1 probabilistic safety assessment (PSA) for the Cernavoda, Unit 1 NPP. The review was based on the PSA documentation available and on intensive communications with the analysis team and representatives from the utility and the plant operator. 7 refs, figs, tabs

  5. International team releases design, cost for next great particle smasher

    CERN Multimedia

    Cho, Adrian

    2007-01-01

    "An internationl team has released a preliminary design and cost estimate for the International Linear Collider (ILC), the hoped-for straight-shot particle smasher that many researchers say is the future of their field."

  6. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  7. The Biosphere International Peer Review

    International Nuclear Information System (INIS)

    Van Luik, Abraham

    2002-01-01

    Abe van Luik (US DOE- YM, USA), ended the presentation by giving feedback from the IAEA peer review on the biosphere modelling strategy developed by the DOE Yucca Mountain Site Characterisation Office (YMSCO). This review was based on available international standards and guidance. The peer review team was constituted of both experts from regulatory and waste management organisations and national advisory committees. The implementation of the review consisted of an examination of biosphere reports mainly regarding the modelling and question and answer exchanges. The final report was submitted in April 2000. It contained twenty-three recommendations within two broad classifications; one concerning the regulatory framework, the other one regarding the framework to increase stakeholders' confidence in modelling. The three main categories of recommendations were outlined, namely (i) the DOE' s Biosphere assessment Approach, (ii) the definition of the biosphere system, and (iii) the model development, data and results. Regarding in particular the treatment of the uncertainties in the biosphere, it was viewed as a key issue during the review and thus it will be re-evaluated in the future performance assessment. The summary highlighted most of the recommendations received are to be acted on, and are to be included in the License Application plan for biosphere modelling

  8. A review of instruments to measure interprofessional team-based primary care.

    Science.gov (United States)

    Shoemaker, Sarah J; Parchman, Michael L; Fuda, Kathleen Kerwin; Schaefer, Judith; Levin, Jessica; Hunt, Meaghan; Ricciardi, Richard

    2016-07-01

    Interprofessional team-based care is increasingly regarded as an important feature of delivery systems redesigned to provide more efficient and higher quality care, including primary care. Measurement of the functioning of such teams might enable improvement of team effectiveness and could facilitate research on team-based primary care. Our aims were to develop a conceptual framework of high-functioning primary care teams to identify and review instruments that measure the constructs identified in the framework, and to create a searchable, web-based atlas of such instruments (available at: http://primarycaremeasures.ahrq.gov/team-based-care/ ). Our conceptual framework was developed from existing frameworks, the teamwork literature, and expert input. The framework is based on an Input-Mediator-Output model and includes 12 constructs to which we mapped both instruments as a whole, and individual instrument items. Instruments were also reviewed for relevance to measuring team-based care, and characterized. Instruments were identified from peer-reviewed and grey literature, measure databases, and expert input. From nearly 200 instruments initially identified, we found 48 to be relevant to measuring team-based primary care. The majority of instruments were surveys (n = 44), and the remainder (n = 4) were observational checklists. Most instruments had been developed/tested in healthcare settings (n = 30) and addressed multiple constructs, most commonly communication (n = 42), heedful interrelating (n = 42), respectful interactions (n = 40), and shared explicit goals (n = 37). The majority of instruments had some reliability testing (n = 39) and over half included validity testing (n = 29). Currently available instruments offer promise to researchers and practitioners to assess teams' performance, but additional work is needed to adapt these instruments for primary care settings.

  9. IAEA Team Concludes Peer Review of Greece's Regulatory Framework for Radiation Safety

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An international team of senior nuclear safety and radiation protection experts yesterday concluded an 11-day mission to review the regulatory framework for nuclear and radiation safety in Greece. The Integrated Regulatory Review Service (IRRS) mission, which was conducted at the request of the Government of the Hellenic Republic, noted good practices in the country's nuclear regulatory system and also identified issues for improvement for the Greek Atomic Energy Commission (GAEC) and the Greek competent authorities. These are aimed at strengthening the effectiveness of the country's regulatory framework and functions in line with IAEA Safety Standards. ''The IRRS team enjoyed excellent cooperation from the GAEC throughout its mission,'' said Tom Ryan, mission leader and Director of Regulations and Information Management at the Radiological Protection Institute of Ireland. ''The GAEC staff were very open and candid in their discussions and provided the fullest practicable assistance.'' The main observations of the IRRS Review team included: While the Greek Government's commitment to safety is being demonstrated through its actions, the development of a comprehensive national policy and strategy expressed in a consolidated statement would provide a valuable framework and guidance for future actions in terms of safety; and GAEC has effective independence. The Greek government has ensured that GAEC is effectively independent in its safety-related decision-making and that it has functional separation from entities having responsibility or interests that could unduly influence its decision making. Strengths and good practices identified by the IRRS team included: Greece actively participates in the global safety regime including all relevant safety conventions; The nation's radiation monitoring system for the detection of illicit trafficking contributes significantly to identifying potential radiation emergencies due to events within or outside the country

  10. IPERS guidelines for the international peer review service. Second edition. Procedures for conducting independent peer reviews of probabilistic safety assessments

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This publication describes the purposes and the objectives of an International Peer Review Service (IPERS) review. The main objective is first to assess whether important technological and methodological issues in the PSA are treated in an adequate manner and, second, whether specific conclusions and applications of the PSA are supported by the underlying technical analysis in an appropriate way. An important aspect for an IPERS review is the communication and exchange of views between the international experts carrying out the review and the members of the PSA team. This TECDOC is intended to give guidance on how an IPERS review is organized and conducted, it describes the steps needed to prepare the review and it highlights the PSA aspects which should be covered in detail. 30 refs, 1 fig., 2 tabs.

  11. IPERS guidelines for the international peer review service. Second edition. Procedures for conducting independent peer reviews of probabilistic safety assessments

    International Nuclear Information System (INIS)

    1995-10-01

    This publication describes the purposes and the objectives of an International Peer Review Service (IPERS) review. The main objective is first to assess whether important technological and methodological issues in the PSA are treated in an adequate manner and, second, whether specific conclusions and applications of the PSA are supported by the underlying technical analysis in an appropriate way. An important aspect for an IPERS review is the communication and exchange of views between the international experts carrying out the review and the members of the PSA team. This TECDOC is intended to give guidance on how an IPERS review is organized and conducted, it describes the steps needed to prepare the review and it highlights the PSA aspects which should be covered in detail. 30 refs, 1 fig., 2 tabs

  12. A scoping review of crisis teams managing dementia in older people

    Directory of Open Access Journals (Sweden)

    Streater A

    2017-10-01

    Full Text Available Amy Streater,1,2 Donna Maria Coleston-Shields,2 Jennifer Yates,2 Miriam Stanyon,2 Martin Orrell2 1Research and Development, North East London NHS Foundation Trust, Ilford, 2Institute of Mental Health, University of Nottingham, Nottingham, UK Background: Research on crisis teams for older adults with dementia is limited. This scoping review aimed to 1 conduct a systematic literature review reporting on the effectiveness of crisis interventions for older people with dementia and 2 conduct a scoping survey with dementia crisis teams mapping services across England to understand operational procedures and identify what is currently occurring in practice.Methods: For the systematic literature review, included studies were graded using the Critical Appraisal Skills Programme checklist. For the scoping survey, Trusts across England were contacted and relevant services were identified that work with people with dementia experiencing a mental health crisis.Results: The systematic literature review demonstrated limited evidence in support of crisis teams reducing the rate of hospital admissions, and despite the increase in number of studies, methodological limitations remain. For the scoping review, only half (51.8% of the teams had a care pathway to manage crises and the primary need for referral was behavioral or psychological factors.Conclusion: Evidence in the literature for the effectiveness of crisis teams for older adults with dementia remains limited. Being mainly cohort designs can make it difficult to evaluate the effectiveness of the intervention. In practice, it appears that the pathway for care managing crisis for people with dementia varies widely across services in England. There was a wide range of names given to the provision of teams managing crisis for people with dementia, which may reflect the differences in the setup and procedures of the service. To provide evidence on crisis intervention teams, a comprehensive protocol is required

  13. What is the value and impact of quality and safety teams? A scoping review

    Directory of Open Access Journals (Sweden)

    Norris Jill M

    2011-08-01

    Full Text Available Abstract Background The purpose of this study was to conduct a scoping review of the literature about the establishment and impact of quality and safety team initiatives in acute care. Methods Studies were identified through electronic searches of Medline, Embase, CINAHL, PsycINFO, ABI Inform, Cochrane databases. Grey literature and bibliographies were also searched. Qualitative or quantitative studies that occurred in acute care, describing how quality and safety teams were established or implemented, the impact of teams, or the barriers and/or facilitators of teams were included. Two reviewers independently extracted data on study design, sample, interventions, and outcomes. Quality assessment of full text articles was done independently by two reviewers. Studies were categorized according to dimensions of quality. Results Of 6,674 articles identified, 99 were included in the study. The heterogeneity of studies and results reported precluded quantitative data analyses. Findings revealed limited information about attributes of successful and unsuccessful team initiatives, barriers and facilitators to team initiatives, unique or combined contribution of selected interventions, or how to effectively establish these teams. Conclusions Not unlike systematic reviews of quality improvement collaboratives, this broad review revealed that while teams reported a number of positive results, there are many methodological issues. This study is unique in utilizing traditional quality assessment and more novel methods of quality assessment and reporting of results (SQUIRE to appraise studies. Rigorous design, evaluation, and reporting of quality and safety team initiatives are required.

  14. Team based learning in nursing and midwifery higher education; a systematic review of the evidence for change.

    Science.gov (United States)

    Dearnley, Chris; Rhodes, Christine; Roberts, Peter; Williams, Pam; Prenton, Sarah

    2018-01-01

    The aim of this study is to review the evidence in relation to the experiences and outcomes of students on nursing and/or midwifery higher education programmes, who experience team based learning. To examine the relationship between team based learning and attainment for nursing and midwifery students in professional higher education. To examine the relationship between team based learning and student satisfaction for nurses and midwifery students in higher education. To identify and report examples of good practice in the implementation of team based learning in Nursing and Midwifery higher education. A systematic Review of the literature was undertaken. The population were nurses and midwives studying on higher education pre and post registration professional programmes. The intervention was learning and teaching activities based on a team-based learning approach. Data sources included CINAHL and MEDLINE. ERIC and Index to Theses were also searched. International research papers published in English between 2011 and 2017 that met the inclusion criteria were included in the study. Papers that met the criteria were subjected to quality appraisal and agreement amongst authors for inclusion in the review. A total of sixteen papers were reviewed and four themes emerged for discussion. These were Student Engagement, Student Satisfaction, Attainment and Practice Development and Transformational Teaching and Learning. There is a tentative, though growing body of evidence to support TBL as a strategy that can impact on student engagement, student satisfaction, attainment, practice development and transformative teaching and learning. The literature indicates that implementing TBL within the curriculum is not without challenge and requires a sustained and structured approach. Staff and students need to understand the processes involved, and why they should be adhered to, in the pursuit of enhanced student experiences and outcomes for nurses and midwives in Higher Education

  15. Ties That Bind International Research Teams: A Network Multilevel Model of Interdisciplinary Collaboration

    Science.gov (United States)

    Kollasch, Aurelia Wiktoria

    2012-01-01

    Today large research projects require substantial involvement of researchers from different organizations, disciplines, or cultures working in groups or teams to accomplish a common goal of producing, sharing, and disseminating scientific knowledge. This study focuses on the international research team that was launched in response to pressing…

  16. History of the Balkan Peace Team. An example of nonviolent international interventions

    Directory of Open Access Journals (Sweden)

    Diego Checa Hidalgo

    2015-06-01

    Full Text Available The Balkan Peace Team was the result of a project designed to make an international nonviolent intervention in some territories of the former Yugoslavia. This project, which was in operation from 1994-2001, generated processes that wanted to contribute to the peaceful resolution of violent conflicts that had erupted in the region in the early 90's. Its methodology consisted of sending international volunteers to collaborate with local peace groups and human rights organizations who may request their help. The Balkan Peace Team was able to strengthen empowerment processes of local organizations in areas of conflict where it was deployed. It also provided lessons to those organizations part of the project in order to increase awareness of the scope and operation of nonviolent international interventions for conflict transformation.

  17. IAEA Team Concludes Peer Review of Sweden's Nuclear Regulatory Framework, 17 February 2012, Stockholm, Sweden

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An international team of senior nuclear safety and radiation protection experts today concluded a 12-day mission to review the regulatory framework for nuclear and radiation safety in Sweden. The Integrated Regulatory Review Service (IRRS) mission, which was conducted at the request of Sweden, noted good practices in the country's nuclear regulatory system and also made recommendations and suggestions for the Swedish Radiation Safety Authority (SSM) and the government. These are aimed at strengthening the effectiveness of the country's regulatory framework and functions in line with IAEA Safety Standards. ''Throughout the mission, the IRRS team received full cooperation from SSM staff in its review of Sweden's regulatory, technical and policy issues,'' said Georg Schwarz, mission leader and Deputy Director General of the Swiss nuclear regulator (ENSI). 'The staff were open and candid in their discussions and provided the fullest practicable assistance', he commented. The main observations of the IRRS Review team included the following: SSM operates as an independent regulator in an open and transparent manner with well-organized regulatory processes; SSM is receptive to feedback and strives to maintain a culture of continuous learning; and Following the TEPCO Fukushima Daiichi accident, SSM responded promptly to public demand for information and communicated effectively with the national government, the public and other interested parties. Good practices identified by the IRRS team included, though they are not limited to, the following: The consolidation of the two previous national regulatory authorities into SSM was successful; Overall, SSM's management system is comprehensive and contributes to staff efficiency and effectiveness; The nuclear power plant refurbishment programme as required by SSM enhanced safety; and Sweden's regulatory framework for high-level waste disposal is comprehensive and technically sound. The IRRS Review team identified

  18. International nuclear safety experts complete IAEA peer review of German regulatory system

    International Nuclear Information System (INIS)

    2008-01-01

    Full text: An international expert team has today completed a two-week IAEA review of Germany's nuclear regulatory system. The team identified good practices within the system and gave advice on some areas for further improvement. The IAEA has conveyed the initial findings to German authorities but the final report will be submitted within two months. At the request of the Government of the Federal Republic of Germany, the International Atomic Energy Agency (IAEA) assembled a team of 14 experts to conduct an Integrated Regulatory Review Service (IRRS) mission. This is a peer review based on IAEA Standards. It is not an inspection, nor an audit. The scope of the mission was limited to the safety regulation of nuclear power plants. Experts from Canada, the Czech Republic, Finland, France, Japan, the Netherlands, Republic of Korea, Spain, Switzerland, the UK, the US and from the IAEA took part in the mission, which was conducted from 7 to 19 September in Bonn, Stuttgart and Berlin. The main basis for the review was a well-prepared self-assessment made by the Federal Ministry of Environment, Nature Conservation and Nuclear Safety (BMU) and the Ministry of Environment of the federal state of Baden-Wuerttemberg (UM BW). 'The team members were impressed by the extensive preparation and dedication of the staff both at BMU and UM BW to excellence in nuclear safety,' said Mike Weightman, IRRS Team Leader and Chief Inspector of the UK nuclear regulatory body, the Nuclear Directorate of the Health and Safety Executive. 'We hope the IRRS mission will facilitate further improvements in the safety regulation of nuclear power in Germany and throughout the world.' 'Germany's invitation to undergo such a detailed review is a clear demonstration of its openness and commitment to continuously improve nuclear safety regulation,' said Philippe Jamet, Director of the IAEA's Nuclear Installation Safety Division. Among the particular strengths of BMU and UM BW associated with their

  19. International Review Team (IRT) Safety Case Recommendations for the Yucca Mountain Total System Performance Assessment (TSPA) Supporting the Site Recommendation

    International Nuclear Information System (INIS)

    Van Luik, Abraham E.

    2004-01-01

    The session started with Abe Van Luik (IGSC Chair, US-DOE-YM, USA) who presented the feedback of the international peer review of the US-DOE Yucca Mountain TSPA (Total System Performance Assessment) supporting the successful designation of the site by the Congress and the President of the U.S. In particular, he listed key implications of the IRT (International Review team) recommendations on the forthcoming US-DOE documentation of its case for safety to be submitted to the regulator, the U.S. Nuclear Regulatory Commission, mainly: - The documentation submitted to the licensing authority should address technical aspects and compliance with regulatory criteria. - That documentation should reflect sound science and good engineering practice; it should present detailed and rigorous modelling. - In addition, it should present both quantitative and qualitative arguments, make a statement on why there can be confidence in the face of uncertainty, acknowledge remaining issues and provide the strategy to resolve them. - Demonstrating understanding is as important as demonstrating compliance. - There is a need to provide a clear explanation of the case made to the regulator for more general audiences to complement the large amount of technical documents that will be produced. The US-DOE response to these recommendations for the License Application, which is under preparation, is that the recommendations will be implemented to the maximum extent possible. In subsequent discussion, with respect to the License Application, it was acknowledged that detailed guidance from the U.S. regulator was very useful, and guidance of this type would be generally useful. At the current time, the words 'safety case' are not mentioned in U.S. regulations, but if one reads both the regulation and guidance documents it becomes evident that all aspects of a safety case need to be provided in the License Application and its accompanying documents

  20. Leadership training in health care action teams: a systematic review.

    Science.gov (United States)

    Rosenman, Elizabeth D; Shandro, Jamie R; Ilgen, Jonathan S; Harper, Amy L; Fernandez, Rosemarie

    2014-09-01

    To identify and describe the design, implementation, and evidence of effectiveness of leadership training interventions for health care action (HCA) teams, defined as interdisciplinary teams whose members coordinate their actions in time-pressured, unstable situations. The authors conducted a systematic search of the PubMed/MEDLINE, CINAHL, ERIC, EMBASE, PsycINFO, and Web of Science databases, key journals, and review articles published through March 2012. They identified peer-reviewed English-language articles describing leadership training interventions targeting HCA teams, at all levels of training and across all health care professions. Reviewers, working in duplicate, abstracted training characteristics and outcome data. Methodological quality was evaluated using the Medical Education Research Study Quality Instrument (MERSQI). Of the 52 included studies, 5 (10%) focused primarily on leadership training, whereas the remainder included leadership training as part of a larger teamwork curriculum. Few studies reported using a team leadership model (2; 4%) or a theoretical framework (9; 17%) to support their curricular design. Only 15 studies (29%) specified the leadership behaviors targeted by training. Forty-five studies (87%) reported an assessment component; of those, 31 (69%) provided objective outcome measures including assessment of knowledge or skills (21; 47%), behavior change (8; 18%), and patient- or system-level metrics (8; 18%). The mean MERSQI score was 11.4 (SD 2.9). Leadership training targeting HCA teams has become more prevalent. Determining best practices in leadership training is confounded by variability in leadership definitions, absence of supporting frameworks, and a paucity of robust assessments.

  1. Systematic review of team Nigeria's performance in olympic games ...

    African Journals Online (AJOL)

    Systematic review of team Nigeria's performance in olympic games: Causes, concerns, and remediation strategies. ... Participation and winning medals in Olympic Games have become a veritable avenue ... AJOL African Journals Online.

  2. Report of the Space Shuttle Management Independent Review Team

    Science.gov (United States)

    1995-02-01

    At the request of the NASA Administrator a team was formed to review the Space Shuttle Program and propose a new management system that could significantly reduce operating costs. Composed of a group of people with broad and extensive experience in spaceflight and related areas, the team received briefings from the NASA organizations and most of the supporting contractors involved in the Shuttle Program. In addition, a number of chief executives from the supporting contractors provided advice and suggestions. The team found that the present management system has functioned reasonably well despite its diffuse structure. The team also determined that the shuttle has become a mature and reliable system, and--in terms of a manned rocket-propelled space launch system--is about as safe as today's technology will provide. In addition, NASA has reduced shuttle operating costs by about 25 percent over the past 3 years. The program, however, remains in a quasi-development mode and yearly costs remain higher than required. Given the current NASA-contractor structure and incentives, it is difficult to establish cost reduction as a primary goal and implement changes to achieve efficiencies. As a result, the team sought to create a management structure and associated environment that enables and motivates the Program to further reduce operational costs. Accordingly, the review team concluded that the NASA Space Shuttle Program should (1) establish a clear set of program goals, placing a greater emphasis on cost-efficient operations and user-friendly payload integration; (2) redefine the management structure, separating development and operations and disengaging NASA from the daily operation of the space shuttle; and (3) provide the necessary environment and conditions within the program to pursue these goals.

  3. Team-Based Care with Pharmacists to Improve Blood Pressure: a Review of Recent Literature.

    Science.gov (United States)

    Kennelty, Korey A; Polgreen, Linnea A; Carter, Barry L

    2018-01-18

    We review studies published since 2014 that examined team-based care strategies and involved pharmacists to improve blood pressure (BP). We then discuss opportunities and challenges to sustainment of team-based care models in primary care clinics. Multiple studies presented in this review have demonstrated that team-based care including pharmacists can improve BP management. Studies highlighted the cost-effectiveness of a team-based pharmacy intervention for BP control in primary care clinics. Little information was found on factors influencing sustainability of team-based care interventions to improve BP control. Future work is needed to determine the best populations to target with team-based BP programs and how to implement team-based approaches utilizing pharmacists in diverse clinical settings. Future studies need to not only identify unmet clinical needs but also address reimbursement issues and stakeholder engagement that may impact sustainment of team-based care interventions.

  4. Interprofessional Teamwork and Collaboration Between Community Health Workers and Healthcare Teams: An Integrative Review.

    Science.gov (United States)

    Franklin, Catherine M; Bernhardt, Jean M; Lopez, Ruth Palan; Long-Middleton, Ellen R; Davis, Sheila

    2015-01-01

    Community Health Workers (CHWs) serve as a means of improving outcomes for underserved populations. However, their relationship within health care teams is not well studied. The purpose of this integrative review was to examine published research reports that demonstrated positive health outcomes as a result of CHW intervention to identify interprofessional teamwork and collaboration between CHWs and health care teams. A total of 47 studies spanning 33 years were reviewed using an integrative literature review methodology for evidence to support the following assumptions of effective interprofessional teamwork between CHWs and health care teams: (1) shared understanding of roles, norms, values, and goals of the team; (2) egalitarianism; (3) cooperation; (4) interdependence; and(5) synergy. Of the 47 studies, 12 reported at least one assumption of effective interprofessional teamwork. Four studies demonstrated all 5 assumptions of interprofessional teamwork. Four studies identified in this integrative review serve as exemplars for effective interprofessional teamwork between CHWs and health care teams. Further study is needed to describe the nature of interprofessional teamwork and collaboration in relation to patient health outcomes.

  5. Export Odyssey: An Exposition and Analytical Review of Literature Concerning an Undergraduate Student Project in International Marketing on Key Teaching-Learning Dimensions.

    Science.gov (United States)

    Williamson, Nicholas C.

    2001-01-01

    Describes Export Odyssey (EO), a structured, Internet-intensive, team-based undergraduate student project in international marketing. Presents an analytical review of articles in the literature that relate to three key teaching-learning dimensions of student projects (experiential versus non-experiential active learning, team-based versus…

  6. International Nuclear and Radiation Safety Experts Conclude IAEA Peer Review of Slovenia's Regulatory System

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of senior nuclear safety experts today concluded a 10-day mission to review the regulatory framework for nuclear and radiation safety in Slovenia. The team identified good practices and gave advice on areas for future improvements. The IAEA has conveyed the team's main conclusions to the Government of Slovenia and a final report will be submitted by the end of 2011. At the request of the Slovenian Government, the IAEA assembled a team of 10 senior regulatory experts from nine nations to conduct the Integrated Regulatory Review Service (IRRS) mission involving the Slovenian Nuclear Safety Administration (SNSA). The mission is a peer review based on the IAEA Safety Standards. Andrej Stritar, Director of Slovenian Nuclear Safety Administration, stressed ''how important it is for a small country like Slovenia to tightly follow international standards in the area of nuclear safety.'' He also expressed his gratitude to the IAEA, and the countries from which team members came, for their support and for their intensive work during the last ten days. Mission Team Leader Colin Patchett, Deputy Chief Inspector from the UK's Office for Nuclear Regulation commended ''the Slovenian authorities for their commitment to nuclear and radiation safety regulation and for sharing their experience.'' The IRRS team reviewed Slovenia's current regulatory framework and all SNSA-regulated facilities and activities, as well as the regulatory implications of the TEPCO Fukushima Daiichi accident. The IRRS team identified particular strengths in the Slovenian regulatory system, including: Through its legal framework, the Slovenian government has appointed SNSA to regulate its nuclear safety program and SNSA has in place an effective process for carrying out this responsibility; and Slovenia's response to the accident at the TEPCO Fukushima Daiichi power plant has been prompt and effective. Communications with the public, development of actions for improvement

  7. Team-Based Professional Development Interventions in Higher Education: A Systematic Review

    Science.gov (United States)

    Gast, Inken; Schildkamp, Kim; van der Veen, Jan T.

    2017-01-01

    Most professional development activities focus on individual teachers, such as mentoring or the use of portfolios. However, new developments in higher education require teachers to work together in teams more often. Due to these changes, there is a growing need for professional development activities focusing on teams. Therefore, this review study…

  8. Teamwork assessment in internal medicine: a systematic review of validity evidence and outcomes.

    Science.gov (United States)

    Havyer, Rachel D A; Wingo, Majken T; Comfere, Nneka I; Nelson, Darlene R; Halvorsen, Andrew J; McDonald, Furman S; Reed, Darcy A

    2014-06-01

    Valid teamwork assessment is imperative to determine physician competency and optimize patient outcomes. We systematically reviewed published instruments assessing teamwork in undergraduate, graduate, and continuing medical education in general internal medicine and all medical subspecialties. We searched MEDLINE, MEDLINE In-process, CINAHL and PsycINFO from January 1979 through October 2012, references of included articles, and abstracts from four professional meetings. Two content experts were queried for additional studies. Included studies described quantitative tools measuring teamwork among medical students, residents, fellows, and practicing physicians on single or multi-professional (interprofessional) teams. Instrument validity and study quality were extracted using established frameworks with existing validity evidence. Two authors independently abstracted 30 % of articles and agreement was calculated. Of 12,922 citations, 178 articles describing 73 unique teamwork assessment tools met inclusion criteria. Interrater agreement was intraclass correlation coefficient 0.73 (95 % CI 0.63-0.81). Studies involved practicing physicians (142, 80 %), residents/fellows (70, 39 %), and medical students (11, 6 %). The majority (152, 85 %) assessed interprofessional teams. Studies were conducted in inpatient (77, 43 %), outpatient (42, 24 %), simulation (37, 21 %), and classroom (13, 7 %) settings. Validity evidence for the 73 tools included content (54, 74 %), internal structure (51, 70 %), relationships to other variables (25, 34 %), and response process (12, 16 %). Attitudes and opinions were the most frequently assessed outcomes. Relationships between teamwork scores and patient outcomes were directly examined for 13 (18 %) of tools. Scores from the Safety Attitudes Questionnaire and Team Climate Inventory have substantial validity evidence and have been associated with improved patient outcomes. Review is limited to quantitative assessments of teamwork in internal

  9. International Energy Agency's Heat Pump Centre (IEA-HPC) Annual National Team Working Group Meeting

    Science.gov (United States)

    Broders, M. A.

    1992-09-01

    The traveler, serving as Delegate from the United States Advanced Heat Pump National Team, participated in the activities of the fourth IEA-HPC National Team Working Group meeting. Highlights of this meeting included review and discussion of 1992 IEA-HPC activities and accomplishments, introduction of the Switzerland National Team, and development of the 1993 IEA-HPC work program. The traveler also gave a formal presentation about the Development and Activities of the IEA Advanced Heat Pump U.S. National Team.

  10. Primary care teams in Ireland: a qualitative mapping review of Irish grey and published literature.

    Science.gov (United States)

    O'Sullivan, M; Cullen, W; MacFarlane, A

    2015-03-01

    The Irish government published its primary care strategy, Primary Care: A New Direction in 2001. Progress with the implementation of Primary care teams is modest. The aim of this paper is to map the Irish grey literature and peer-reviewed publications to determine what research has been carried out in relation to primary care teams, the reform process and interdisciplinary working in primary care in Ireland. This scoping review employed three methods: a review of Web of Science, Medline and Embase databases, an email survey of researchers across academic institutions, the HSE and independent researchers and a review of Lenus and the Health Well repository. N = 123 outputs were identified. N = 14 were selected for inclusion. A thematic analysis was undertaken. Common themes identified were resources, GP participation, leadership, clarity regarding roles in primary care teams, skills and knowledge for primary care team working, communication and community. There is evidence of significant problems that disrupt team formation and functioning that warrants more comprehensive research.

  11. Establishing and maintaining international collaborative research teams: an autobiographical insight

    Directory of Open Access Journals (Sweden)

    T J Carr

    2013-07-01

    Full Text Available Despite the growing impetus for international collaborative research teams (ICRT, there are relatively few resources available to guide and support researchers through the processes of establishing and maintaining ICRTs. In particular, no articles were found that provided researchers’ firsthand accounts of being a member of such a team. Having access to such personal accounts can help both experienced and novice researchers learn more directly about what to expect, as well as the benefits, challenges, pitfalls, and success strategies for establishing and maintaining ICRTs. The authors used phenomenological autobiographical reflective journaling to capture their experiences as members of ICRTs. In this article we provide an overview of key themes that emerged from the analysis of our reflections as members of ICRTs. These themes include: benefits, challenges, and strategies for success. Our aim is to share our first-hand experiences of what it is like to establish and participate in ICRT. It is not our intention to provide readers with prescriptive guidelines on how to set up and maintain ICRTs. Every ICRT is unique and some of these ideas may or may not apply in every case. Instead, we are describing what worked for us, hoping that others may benefit from our experience. Consequently, we suggest that the focus of ICRT should be on the benefits thereof which promote and encourage interaction between disciplines, transfer of knowledge and techniques and personal and professional development. Keywords: international, collaborative, research, teams, interdisciplinary

  12. Report of the IPERS (International Peer Review Service) phase 1 review mission for the Temelin nuclear power plant Level 1 probabilistic safety assessment in the Czech Republic 24 April to 5 May 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report presents the results of the IAEA International Peer Review Services Phase 1 review of the internal events, Level 1 probabilistic safety assessment (PSA) for the Temelin Unit 1 and 2 NPP. The review was based on the PSA documentation available and on intensive communications with the analysis team and representatives from the utility and future plant operator. The results presented herein reflect the views of the international experts carrying out the review. They are provided for consideration by the responsible authorities of the Czech Republic. 2 refs, 1 fig., 5 tabs

  13. Culture and teams.

    Science.gov (United States)

    Kirkman, Bradley L; Shapiro, Debra L; Lu, Shuye; McGurrin, Daniel P

    2016-04-01

    We first review research on culture effects in teams, illustrating that mean levels of team cultural values have main (i.e. direct) effects, indirect effects (i.e. mediated by intervening variables), and moderating influences on team processes and outcomes. Variance in team cultural values or on country of origin (i.e. nationality diversity) also has main effects on team functioning, and we highlight contextual variables that strengthen or weaken these main effects. We next review research examining the effect of variance in team cultural values on global virtual teams, specifically. Finally, we review research on how cultural values shape employees' receptivity to empowering leadership behavior in teams. We conclude by discussing critical areas for future research. Published by Elsevier Ltd.

  14. The Research of Self-Management Team and Superior-Direction Team in Team Learning Influential Factors

    OpenAIRE

    Zhang Wei

    2013-01-01

    Team learning is a cure for bureaucracy; it facilitates team innovation and team performance. But team learning occurs only when necessary conditions were met. This research focused on differences of team learning influential factors between self-management team and superior-direction team. Four variables were chosen as predictors of team learning though literature review and pilot interview. The 4 variables are team motivation, team trust, team conflict and team leadership. Selected 54 self ...

  15. Impact of Diabetes Care by Pharmacists as Part of Health Care Team in Ambulatory Settings: A Systematic Review and Meta-analysis.

    Science.gov (United States)

    Fazel, Maryam T; Bagalagel, Alaa; Lee, Jeannie K; Martin, Jennifer R; Slack, Marion K

    2017-10-01

    To conduct a comprehensive systematic review and meta-analyses examining the impact of pharmacist interventions as part of health care teams on diabetes therapeutic outcomes in ambulatory care settings. PubMed/MEDLINE, EMBASE, Cochrane Library, International Pharmaceutical Abstracts, Web of Science, Scopus, WHO's Global Health Library, ClinicalTrials.gov , and Google Scholar were searched (1995 to February 2017). Search terms included pharmacist, team, and diabetes. Full-text articles published in English with comparative designs, including randomized controlled trials, nonrandomized controlled trials, and pretest-posttest studies evaluating hemoglobin A 1C (A1C), were assessed. Two reviewers independently screened for study inclusion and extracted data. Quality of the studies was assessed using tools developed based on the framework of the Cochrane Collaboration's recommendations. A total of 1908 studies were identified from the literature and reference searches; 42 studies were included in the systematic review (n = 10 860) and 35 in the meta-analyses (n = 7417). Mean age ranged from 42 to 73 years, and 8% to 100% were male. The overall standardized mean difference (SMD) for A1C for pharmacist care versus comparison was 0.57 ( P 83%), indicating functional differences among the studies. No publication bias was detected. Pharmacists' interventions as part of the patient's health care team improved diabetes therapeutic outcomes, substantiating the important role of pharmacists in team-based diabetes management.

  16. Report of the IPERS (International Peer Review Service) review mission for the Bohunice-V2 nuclear power plant Level 1 probabilistic safety assessment in the Slovak Republic 17 to 28 January 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report presents the results of the IAEA International Peer Review Services (IPERS) review of the probabilistic safety assessment (PSA) for the Bohunice-V2 NPP. The review was based on the PSA documentation available and on intensive communications with the analysis team and representatives from the utility and the plant operator. The results presented herein reflect the views of the international experts carrying out the review. They are provided for consideration by the responsible authorities of the Slovak Republic. 12 refs, 4 tabs

  17. International nuclear safety experts conclude IAEA peer review of China's regulatory system

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of senior experts on nuclear safety regulation today completed a two-week International Atomic Energy Agency (IAEA) review of the governmental and regulatory framework for nuclear safety in the People's Republic of China. The team identified good practices within the system and gave advice on areas for future improvements. The IAEA has conveyed the team's main conclusions to the Government of the People's Republic of China. The final report will be submitted to China by Autumn 2010. At the request of Chinese authorities, the IAEA assembled a team of 22 experts to conduct an Integrated Regulatory Review Service (IRRS) mission. This mission is a peer review based on the IAEA Safety Standards . It is not an inspection, nor an audit. The experts came from 15 different countries: Australia, Canada, the Czech Republic, Finland, France, Hungary, Japan, Pakistan, the Republic of Korea, Slovenia, South Africa, Sweden, the United Kingdom, Ukraine and the United States. Mike Weightman, the United Kingdom's Head of Nuclear Directorate, HSE and HM Chief Inspector of Nuclear Installations said: ''I was honoured and pleased to lead such a team of senior regulatory experts from around the world, and I was impressed by their commitment, experience and hard work to provide their best advice possible. We had very constructive interactions with the Chinese authority to maximize the beneficial impact of the mission.'' The scope of the mission included the regulation of nuclear and radiation safety of the facilities and activities regulated by the Ministry of Environmental Protection (MEP) National Nuclear Safety Administration (NNSA). The mission was conducted from 18 to 30 July, mainly in Beijing. To observe Chinese regulatory activities, the IRRS team visited several nuclear facilities, including a nuclear power plant, a manufacturer of safety components for nuclear power plants, a research reactor, a fuel cycle facility, a waste management facility

  18. Entrepreneurial team cognition: A review

    NARCIS (Netherlands)

    de Mol, E.; Khapova, S.N.; Elfring, T.

    2015-01-01

    Entrepreneurial team scholars highlight the importance of studying entrepreneurial team cognition in gaining a better understanding of why some entrepreneurial teams are capable of developing teamwork leading to successful entrepreneurial outcomes while others are not. However, in the absence of a

  19. What benefits does team sport hold for the workplace? A systematic review.

    Science.gov (United States)

    Brinkley, Andrew; McDermott, Hilary; Munir, Fehmidah

    2017-01-01

    Physical inactivity is proven to be a risk factor for non-communicable diseases and all-cost mortality. Public health policy recommends community settings worldwide such as the workplace to promote physical activity. Despite the growing prevalence of workplace team sports, studies have not synthesised their benefits within the workplace. A systematic review was carried out to identify articles related to workplace team sports, including intervention, observational and qualitative studies. Eighteen studies met the inclusion criteria. The findings suggest team sport holds benefits not only for individual health but also for group cohesion and performance and organisational benefits such as the increased work performance. However, it is unclear how sport is most associated with these benefits as most of the studies included poorly described samples and unclear sports activities. Our review highlights the need to explore and empirically understand the benefits of workplace team sport for individual, group and organisational health outcomes. Researches carried out in this field must provide details regarding their respective samples, the sports profile and utilise objective measures (e.g., sickness absence register data, accelerometer data).

  20. Variations in structures, processes and outcomes of community mental health teams for older people: a systematic review of the literature.

    Science.gov (United States)

    Abendstern, M; Harrington, V; Brand, C; Tucker, S; Wilberforce, M; Challis, D

    2012-01-01

    In the UK and elsewhere, specialist community mental health teams (CMHTs) are central to the provision of comprehensive services for older people with mental ill health. Recent guidance documents suggest a core set of attributes that such teams should encompass. This article reports on a systematic literature review undertaken to collate existing evidence regarding the structures and processes of CMHTs for older people and to evaluate evidence linking approaches to effectiveness. Relevant publications were identified via systematic searches, both electronic and manual. Searches were limited to the UK for descriptions of organisation and practice but included international literature where comparisons between different CMHT arrangements were evaluated. Empirical, peer-reviewed studies from 1989 onward were included, extended to non peer-reviewed nationally or regionally representative reports, published after 1998, for the descriptive element. Forty-five studies met inclusion criteria of which seven provided comparative outcome data. All but one were UK based. The most robust evidence related to research conducted in exemplar teams. Limited evidence was found regarding the effectiveness of many of the core attributes recommended in policy directives although their presence was reported in much of the literature. The contrast between presentation and evaluation of attributes is stark. Whilst some gaps can be filled from related fields, further research is required that moves beyond description to evaluation of the impact of team design on service user outcomes in order to inform future policy directives and practice guidance. A framework for an evidence-based model of CMHTs for older people is provided.

  1. Virtual Teams and International Business Teaching and Learning: The Case of the Global Enterprise Experience (GEE)

    Science.gov (United States)

    Gonzalez-Perez, Maria Alejandra; Velez-Calle, Andres; Cathro, Virginia; Caprar, Dan V.; Taras, Vasyl

    2014-01-01

    The increasing importance of global virtual teams in business is reflected in the classroom by the increased adoption of activities that facilitate real-time cross-cultural interaction. This article documents the experience of students from two Colombian universities who participated in a collaborative international project using virtual teams as…

  2. Test-Retest Reliability of an Experienced Global Trigger Tool Review Team

    DEFF Research Database (Denmark)

    Bjørn, Brian; Anhøj, Jacob; Østergaard, Mette

    2018-01-01

    and review 2 and between period 1 and period 2. The increase was solely in category E, minor temporary harm. CONCLUSIONS: The very experienced GTT team could not reproduce harm rates found in earlier reviews. We conclude that GTT in its present form is not a reliable measure of harm rate over time....

  3. Structural contingency theory and individual differences: examination of external and internal person-team fit.

    Science.gov (United States)

    Hollenbeck, John R; Moon, Henry; Ellis, Aleksander P J; West, Bradley J; Ilgen, Daniel R; Sheppard, Lori; Porter, Christopher O L H; Wagner, John A

    2002-06-01

    This article develops and tests a structurally based, integrated theory of person-team fit. The theory developed is an extension of structural contingency theory and considers issues of external fit simultaneously with its examination of internal fit at the team level. Results from 80 teams working on an interdependent team task indicate that divisional structures demand high levels of cognitive ability on the part of teammembers. However, the advantages of high cognitive ability in divisional structures are neutralized when there is poor external fit between the structure and the environment. Instead, emotional stability becomes a critical factor among teammembers when a divisional structure is out of alignment with its environment. Individual differences seem to play little or no role in functional structures, regardless of the degree of external fit.

  4. Learning from nuclear regulatory self-assessment. International peer review of the CSN report on lessons learnt from the essential service water system degradation event at the Vandellos nuclear power plant

    International Nuclear Information System (INIS)

    2006-01-01

    Nuclear regulatory self-assessment together with the benchmarking of regulatory practices against those of other countries operating nuclear power plants are key elements in maintaining a high level of nuclear safety. In that light, the Spanish Consejo de Seguridad Nuclear (CSN) formally asked the OECD Nuclear Energy Agency (NEA) to establish an international peer review team to assess the CSN report on the lessons learnt as a result of the 2004 Vandellos II event involving essential service water system degradation. The International Review Team considers the CSN report prepared in follow-up to the Vandellos event to be a commendable effort in regulatory self-assessment. The report, complemented by this international peer review, should enable the CSN to take appropriate action to ensure that its regulatory supervision is in line with best international practice. (authors)

  5. Outcomes of classroom-based team training interventions for multiprofessional hospital staff. A systematic review

    DEFF Research Database (Denmark)

    Rabøl, Louise Isager; Østergaard, Doris; Mogensen, Torben

    2010-01-01

    Several studies show that communication errors in healthcare teams are frequent and can lead to adverse events. Team training has been suggested as a way to safer communication and has been implemented in healthcare as classroom-based or simulation-based team training or a combination of both. Th....... The objective of this paper is to systematically review studies evaluating the outcomes of classroom-based multiprofessional team training for hospital staff.......Several studies show that communication errors in healthcare teams are frequent and can lead to adverse events. Team training has been suggested as a way to safer communication and has been implemented in healthcare as classroom-based or simulation-based team training or a combination of both...

  6. NASA Physical Sciences - Presentation to Annual Two Phase Heat Transfer International Topical Team Meeting

    Science.gov (United States)

    Chiaramonte, Francis; Motil, Brian; McQuillen, John

    2014-01-01

    The Two-phase Heat Transfer International Topical Team consists of researchers and members from various space agencies including ESA, JAXA, CSA, and RSA. This presentation included descriptions various fluid experiments either being conducted by or planned by NASA for the International Space Station in the areas of two-phase flow, flow boiling, capillary flow, and crygenic fluid storage.

  7. A systematic review of team formulation in clinical psychology practice: Definition, implementation, and outcomes.

    Science.gov (United States)

    Geach, Nicole; Moghaddam, Nima G; De Boos, Danielle

    2017-10-03

    Team formulation is promoted by professional practice guidelines for clinical psychologists. However, it is unclear whether team formulation is understood/implemented in consistent ways - or whether there is outcome evidence to support the promotion of this practice. This systematic review aimed to (1) synthesize how team formulation practice is defined and implemented by practitioner psychologists and (2) analyse the range of team formulation outcomes in the peer-reviewed literature. Seven electronic bibliographic databases were searched in June 2016. Eleven articles met inclusion criteria and were quality assessed. Extracted data were synthesized using content analysis. Descriptions of team formulation revealed three main forms of instantiation: (1) a structured, consultation approach; (2) semi-structured, reflective practice meetings; and (3) unstructured/informal sharing of ideas through routine interactions. Outcome evidence linked team formulation to a range of outcomes for staff teams and service users, including some negative outcomes. Quality appraisal identified significant issues with evaluation methods; such that, overall, outcomes were not well-supported. There is weak evidence to support the claimed beneficial outcomes of team formulation in practice. There is a need for greater specification and standardization of 'team formulation' practices, to enable a clearer understanding of any relationships with outcomes and implications for best-practice implementations. Under the umbrella term of 'team formulation', three types of practice are reported: (1) highly structured consultation; (2) reflective practice meetings; and (3) informal sharing of ideas. Outcomes linked to team formulation, including some negative outcomes, were not well evidenced. Research using robust study designs is required to investigate the process and outcomes of team formulation practice. © 2017 The British Psychological Society.

  8. Nursing team stress in the perioperative period: an integrative review

    Directory of Open Access Journals (Sweden)

    Dafne Eva Corrêa Brandão

    2013-09-01

    Full Text Available This integrative review aimed at analyzing evidences available in literature regarding stress levels in nursing teams during the perioperative period. Primary studies were searched in the following databases: PubMed, CINAHL and LILACS. Included studies were grouped into the following thematic categories: stress level in the workplace and stress factors (n=8 and stress coping strategies used by the nursing staff (n=6. Evidence suggests that stress in the workplace worsens the health of the nursing team, provoking undesirable effects both in the professional and personal lives of these professionals. The assessment of working conditions to identify the main stressing factors and the implementation of individual and organizational measures to reduce nursing teams stress may increase productivity and workers’ satisfaction, improving the assistance quality offered to surgical patients.

  9. Can Team-Based Care Improve Patient Satisfaction? A Systematic Review of Randomized Controlled Trials

    Science.gov (United States)

    Wen, Jin; Schulman, Kevin A.

    2014-01-01

    Background Team-based approaches to patient care are a relatively recent innovation in health care delivery. The effectiveness of these approaches on patient outcomes has not been well documented. This paper reports a systematic review of the relationship between team-based care and patient satisfaction. Methods We searched MEDLINE, EMBASE, Cochrane Library, CINAHL, and PSYCHOINFO for eligible studies dating from inception to October 8, 2012. Eligible studies reported (1) a randomized controlled trial, (2) interventions including both team-based care and non-team-based care (or usual care), and (3) outcomes including an assessment of patient satisfaction. Articles with different settings between intervention and control were excluded, as were trial protocols. The reference lists of retrieved papers were also evaluated for inclusion. Results The literature search yielded 319 citations, of which 77 were screened for further full-text evaluation. Of these, 27 articles were included in the systematic review. The 26 trials with a total of 15,526 participants were included in this systematic review. The pooling result of dichotomous data (number of studies: 10) showed that team-based care had a positive effect on patient satisfaction compared with usual care (odds ratio, 2.09; 95% confidence interval, 1.54 to 2.84); however, combined continuous data (number of studies: 7) demonstrated that there was no significant difference in patient satisfaction between team-based care and usual care (standardized mean difference, −0.02; 95% confidence interval, −0.40 to 0.36). Conclusions Some evidence showed that team-based care is better than usual care in improving patient satisfaction. However, considering the pooling result of continuous data, along with the suboptimal quality of included trials, further large-scale and high-quality randomized controlled trials comparing team-based care and usual care are needed. PMID:25014674

  10. Healthcare team training programs aimed at improving depression management in primary care: A systematic review.

    Science.gov (United States)

    Vöhringer, Paul A; Castro, Ariel; Martínez, Pablo; Tala, Álvaro; Medina, Simón; Rojas, Graciela

    2016-08-01

    Although evidence from Latin America and the Caribbean suggests that depression can be effectively treated in primary care settings, depression management remains unevenly performed. This systematic review evaluates all the international evidence on healthcare team training programs aimed at improving the outcomes of patients with depression. Three databases were searched for articles in English or Spanish indexed up to November 20, 2014. Studies were included if they fulfilled the following conditions: clinical trials, meta-analyses, or systematic reviews; and if they evaluated a training or educational program intended to improve the management of depression by primary healthcare teams, and assessed change in depressive symptoms, diagnosis or response rates, referral rates, patients' satisfaction and/or quality of life, and the effectiveness of treatments. Nine studies were included in this systematic review. Five trials tested the effectiveness of multi-component interventions (training included), and the remaining studies evaluated the effectiveness of specific training programs for depression management. All the studies that implemented multi-component interventions were efficacious, and half of the training trials were shown to be effective. Contribution of training programs alone to the effectiveness of multi-component interventions is yet to be established. The lack of specificity regarding health providers' characteristics might be a confounding factor. The review conducted suggests that stand-alone training programs are less effective than multi-component interventions. In applying the evidence gathered from developed countries to Latin America and the Caribbean, these training programs must consider and address local conditions of mental health systems, and therefore multi-component interventions may be warranted. Copyright © 2016 Elsevier B.V. All rights reserved.

  11. Microdynamics in diverse teams : A review and integration of the diversity and stereotyping literatures

    NARCIS (Netherlands)

    van Dijk, J.; Meyer, B.; van Engen, M.L.; Loyd, D.L.

    2017-01-01

    Research on the consequences of diversity in teams continues to produce inconsistent results. We review the recent developments in diversity research and identify two shortcomings. First, an understanding of the microdynamics affecting processes and outcomes in diverse teams is lacking. Second,

  12. Team player styles, team design variables and team work effectiveness in Egypt

    OpenAIRE

    El-Kot, Ghada Awed Hassan

    2001-01-01

    The literature has revealed few studies of management in Arab countries in general and particularly in Egypt. Many Egyptian organisations implemented the team concept a number of years ago, however, there do not appear to be any studies investicitaýt inc",D team work effectiveness in Egypt. The literature review and the findings of a pilot study emphasised the need for empirical research in team work in Egypt. Team effectiveness models are examined in order to identify the fact...

  13. The systematic review team: contributions of the health sciences librarian.

    Science.gov (United States)

    Dudden, Rosalind F; Protzko, Shandra L

    2011-01-01

    While the role of the librarian as an expert searcher in the systematic review process is widely recognized, librarians also can be enlisted to help systematic review teams with other challenges. This article reviews the contributions of librarians to systematic reviews, including communicating methods of the review process, collaboratively formulating the research question and exclusion criteria, formulating the search strategy on a variety of databases, documenting the searches, record keeping, and writing the search methodology. It also discusses challenges encountered such as irregular timelines, providing education, communication, and learning new technologies for record keeping. Rewards include building relationships with researchers, expanding professional expertise, and receiving recognition for contributions to health care outcomes.

  14. Team climate and quality of care in primary health care: a review of studies using the Team Climate Inventory in the United Kingdom

    OpenAIRE

    Goh, Teik T; Eccles, Martin P

    2009-01-01

    Abstract Background Attributes of teams could affect the quality of care delivered in primary care. The aim of this study was to systematically review studies conducted within the UK NHS primary care that have measured team climate using the Team Climate Inventory (TCI), and to describe, if reported, the relationship between the TCI and measures of quality of care. Findings The databases MEDLINE, EMBASE, and CINAHL were searched. The reference lists of included article were checked and one re...

  15. Fort Hood Army Internal Review Team: Final Report

    Science.gov (United States)

    2010-08-04

    lead to or re- sult in violent acts. 2. Finding 2.3 - DoD standards for denying requests for recognition as an ecclesiastical endorser of chaplains may...review and pos- sible revision to ensure the supporting architecture and capabilities exist to support the mission. No cost estimate is necessary to...enterprise architecture . The goal is to field interoperable installation physi- cal access control systems that can access the Defense Manpower Data

  16. Review of Hanford international activities

    International Nuclear Information System (INIS)

    Panther, D.G.

    1993-01-01

    Hanford initiated a review of international activities to collect, review, and summarize information on international environmental restoration and waste management initiatives considered for use at Hanford. This effort focused on Hanford activities and accomplishments, especially international technical exchanges and/or the implementation of foreign-developed technologies

  17. International Expert Review of Sr-Can: Safety Assessment Methodology - External review contribution in support of SSI's and SKI's review of SR-Can

    International Nuclear Information System (INIS)

    Sagar, Budhi; Egan, Michael; Roehlig, Klaus-Juergen; Chapman, Neil; Wilmot, Roger

    2008-03-01

    In 2006, SKB published a safety assessment (SR-Can) as part of its work to support a licence application for the construction of a final repository for spent nuclear fuel. The purposes of the SR-Can project were stated in the main project report to be: 1. To make a first assessment of the safety of potential KBS-3 repositories at Forsmark and Laxemar to dispose of canisters as specified in the application for the encapsulation plant. 2. To provide feedback to design development, to SKB's research and development (R and D) programme, to further site investigations and to future safety assessments. 3. To foster a dialogue with the authorities that oversee SKB's activities, i.e. the Swedish Nuclear Power Inspectorate, SKI, and the Swedish Radiation Protection Authority, SSI, regarding interpretation of applicable regulations, as a preparation for the SR-Site project. To help inform their review of SKB's proposed approach to development of the longterm safety case, the authorities appointed three international expert review teams to carry out a review of SKB's SR-Can safety assessment report. Comments from one of these teams - the Safety Assessment Methodology (SAM) review team - are presented in this document. The SAM review team's scope of work included an examination of SKB's documentation of the assessment ('Long-term safety for KBS-3 Repositories at Forsmark and Laxemar - a first evaluation' and several supporting reports) and hearings with SKB staff and contractors, held in March 2007. As directed by SKI and SSI, the SAM review team focused on methodological aspects and sought to determine whether SKB's proposed safety assessment methodology is likely to be suitable for use in the future SR-Site and to assess its consistency with the Swedish regulatory framework. No specific evaluation of long-term safety or site acceptability was undertaken by any of the review teams. SKI and SSI's Terms of Reference for the SAM review team requested that consideration be given

  18. Internal Medicine Residents' Perceptions of Team-Based Care and its Educational Value in the Continuity Clinic: A Qualitative Study.

    Science.gov (United States)

    Soones, Tacara N; O'Brien, Bridget C; Julian, Katherine A

    2015-09-01

    In order to teach residents how to work in interprofessional teams, educators in graduate medical education are implementing team-based care models in resident continuity clinics. However, little is known about the impact of interprofessional teams on residents' education in the ambulatory setting. To identify factors affecting residents' experience of team-based care within continuity clinics and the impact of these teams on residents' education. This was a qualitative study of focus groups with internal medicine residents. Seventy-seven internal medicine residents at the University of California San Francisco at three continuity clinic sites participated in the study. Qualitative interviews were audiotaped and transcribed. The authors used a general inductive approach with sensitizing concepts in four frames (structural, human resources, political and symbolic) to develop codes and identify themes. Residents believed that team-based care improves continuity and quality of care. Factors in four frames affected their ability to achieve these goals. Structural factors included communication through the electronic medical record, consistent schedules and regular team meetings. Human resources factors included the presence of stable teams and clear roles. Political and symbolic factors negatively impacted team-based care, and included low staffing ratios and a culture of ultimate resident responsibility, respectively. Regardless of the presence of these factors or resident perceptions of their teams, residents did not see the practice of interprofessional team-based care as intrinsically educational. Residents' experiences practicing team-based care are influenced by many principles described in the interprofessional teamwork literature, including understanding team members' roles, good communication and sufficient staffing. However, these attributes are not correlated with residents' perceptions of the educational value of team-based care. Including residents in

  19. Addressing the paradox of the team innovation process: A review and practical considerations.

    Science.gov (United States)

    Thayer, Amanda L; Petruzzelli, Alexandra; McClurg, Caitlin E

    2018-01-01

    Facilitating team innovation is paramount to promoting progress in the science, technology, engineering, and math fields, as well as advancing national health, safety, prosperity, and welfare. However, innovation teams face a unique set of challenges due to the novelty and uncertainty that is core to the definition of innovation, as well as the paradoxical nature of idea generation and idea implementation processes. These and other challenges must be overcome for innovation teams to realize their full potential for producing change. The purpose of this review is, thus, to provide insight into the unique context that these teams function within and provide an integrative, evidence-based, and practically useful, organizing heuristic that focuses on the most important considerations for facilitating team innovation. Finally, we provide practical guidance for psychologists, organizations, practitioners, scientists, educators, policymakers, and others who employ teams to produce novel, innovative solutions to today's problems. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  20. Performance Assessment of Military Teams in Simulator and Live Exercises

    Science.gov (United States)

    2013-09-01

    Convergence: The future of Command and Control. The International C2 Journal, 1(1), 1–30. Bandura , A. (1977). Self-efficacy: Toward a Unifying Theory of...York: The HK Fly company. Ford, C. M. (1996). A Theory of Individual Creative Action in Multiple Social Domains. The Academy of Management Review...individual alone. Despite the dependence society has on teams, there is still much to be learned about the processes that occur within a team that

  1. Shared Authentic Leadership in Research Teams: Testing a Multiple Mediation Model.

    Science.gov (United States)

    Guenter, Hannes; Gardner, William L; Davis McCauley, Kelly; Randolph-Seng, Brandon; Prabhu, Veena P

    2017-12-01

    Research teams face complex leadership and coordination challenges. We propose shared authentic leadership (SAL) as a timely approach to addressing these challenges. Drawing from authentic and functional leadership theories, we posit a multiple mediation model that suggests three mechanisms whereby SAL influences team effectiveness: shared mental models (SMM), team trust, and team coordination. To test our hypotheses, we collected survey data on leadership and teamwork within 142 research teams that recently published an article in a peer-reviewed management journal. The results indicate team coordination represents the primary mediating mechanism accounting for the relationship between SAL and research team effectiveness. While teams with high trust and SMM felt more successful and were more satisfied, they were less successful in publishing in high-impact journals. We also found the four SAL dimensions (i.e., self-awareness, relational transparency, balanced processing, and internalized moral perspective) to associate differently with team effectiveness.

  2. Multidisciplinary in-hospital teams improve patient outcomes: A review.

    Science.gov (United States)

    Epstein, Nancy E

    2014-01-01

    The use of multidisciplinary in-hospital teams limits adverse events (AE), improves outcomes, and adds to patient and employee satisfaction. Acting like "well-oiled machines," multidisciplinary in-hospital teams include "staff" from different levels of the treatment pyramid (e.g. staff including nurses' aids, surgical technicians, nurses, anesthesiologists, attending physicians, and others). Their enhanced teamwork counters the "silo effect" by enhancing communication between the different levels of healthcare workers and thus reduces AE (e.g. morbidity/mortality) while improving patient and healthcare worker satisfaction. Multiple articles across diverse disciplines incorporate a variety of concepts of "teamwork" for staff covering emergency rooms (ERs), hospital wards, intensive care units (ICUs), and most critically, operating rooms (ORs). Cohesive teamwork improved communication between different levels of healthcare workers, and limited adverse events, improved outcomes, decreased the length of stay (LOS), and yielded greater patient "staff" satisfaction. Within hospitals, delivering the best medical/surgical care is a "team sport." The goals include: Maximizing patient safety (e.g. limiting AE) and satisfaction, decreasing the LOS, and increasing the quality of outcomes. Added benefits include optimizing healthcare workers' performance, reducing hospital costs/complications, and increasing job satisfaction. This review should remind hospital administrators of the critical need to keep multidisciplinary teams together, so that they can continue to operate their "well-oiled machines" enhancing the quality/safety of patient care, while enabling "staff" to optimize their performance and enhance their job satisfaction.

  3. Multidisciplinary team, working with elderly persons living in the community: a systematic literature review.

    Science.gov (United States)

    Johansson, Gudrun; Eklund, Kajsa; Gosman-Hedström, Gunilla

    2010-01-01

    As the number of elderly persons with complex health needs is increasing, teams for their care have been recommended as a means of meeting these needs, particularly in the case of elderly persons with multi-diseases. Occupational therapists, in their role as team members, exert significant influence in guiding team recommendations. However, it has been emphasized that there is a lack of sound research to show the impact of teamwork from the perspective of elderly persons. The aim of this paper was to explore literature concerning multidisciplinary teams that work with elderly persons living in the community. The research method was a systematic literature review and a total of 37 articles was analysed. The result describes team organisation, team intervention and outcome, and factors that influence teamwork. Working in a team is multifaceted and complex. It is important to enhance awareness about factors that influence teamwork. The team process itself is also of great importance. Clinical implications for developing effective and efficient teamwork are also presented and discussed.

  4. International Expert Review of Sr-Can: Safety Assessment Methodology - External review contribution in support of SSI's and SKI's review of SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sagar, Budhi (Center for Nuclear Waste Regulatory Analyses, Southwest Research Inst., San Antonio, TX (US)); Egan, Michael (Quintessa Limited, Henley-on-Thames (GB)); Roehlig, Klaus-Juergen (Gesellschaft fuer Anlagen- und Reaktorsicherheit mbH (DE)); Chapman, Neil (Independent Consultant (XX)); Wilmot, Roger (Galson Sciences Limited, Oakham (GB))

    2008-03-15

    In 2006, SKB published a safety assessment (SR-Can) as part of its work to support a licence application for the construction of a final repository for spent nuclear fuel. The purposes of the SR-Can project were stated in the main project report to be: 1. To make a first assessment of the safety of potential KBS-3 repositories at Forsmark and Laxemar to dispose of canisters as specified in the application for the encapsulation plant. 2. To provide feedback to design development, to SKB's research and development (R and D) programme, to further site investigations and to future safety assessments. 3. To foster a dialogue with the authorities that oversee SKB's activities, i.e. the Swedish Nuclear Power Inspectorate, SKI, and the Swedish Radiation Protection Authority, SSI, regarding interpretation of applicable regulations, as a preparation for the SR-Site project. To help inform their review of SKB's proposed approach to development of the longterm safety case, the authorities appointed three international expert review teams to carry out a review of SKB's SR-Can safety assessment report. Comments from one of these teams - the Safety Assessment Methodology (SAM) review team - are presented in this document. The SAM review team's scope of work included an examination of SKB's documentation of the assessment ('Long-term safety for KBS-3 Repositories at Forsmark and Laxemar - a first evaluation' and several supporting reports) and hearings with SKB staff and contractors, held in March 2007. As directed by SKI and SSI, the SAM review team focused on methodological aspects and sought to determine whether SKB's proposed safety assessment methodology is likely to be suitable for use in the future SR-Site and to assess its consistency with the Swedish regulatory framework. No specific evaluation of long-term safety or site acceptability was undertaken by any of the review teams. SKI and SSI's Terms of Reference for the SAM

  5. The organization of multidisciplinary care teams: modeling internal and external influences on cancer care quality.

    Science.gov (United States)

    Fennell, Mary L; Das, Irene Prabhu; Clauser, Steven; Petrelli, Nicholas; Salner, Andrew

    2010-01-01

    Quality cancer treatment depends upon careful coordination between multiple treatments and treatment providers, the exchange of technical information, and regular communication between all providers and physician disciplines involved in treatment. This article will examine a particular type of organizational structure purported to regularize and streamline the communication between multiple specialists and support services involved in cancer treatment: the multidisciplinary treatment care (MDC) team. We present a targeted review of what is known about various types of MDC team structures and their impact on the quality of treatment care, and we outline a conceptual model of the connections between team context, structure, process, and performance and their subsequent effects on cancer treatment care processes and patient outcomes. Finally, we will discuss future research directions to understand how MDC teams improve patient outcomes and how characteristics of team structure, culture, leadership, and context (organizational setting and local environment) contribute to optimal multidisciplinary cancer care.

  6. Radioactive waste safety appraisal. An international peer review of the licence application for the Australian near surface radioactive waste disposal facility. Report of the IAEA International Review Team

    International Nuclear Information System (INIS)

    2004-05-01

    Radioactive waste has been generated in Australia for a number of decades from the production and use of radioactive materials in medicine and industry, from the processing of various minerals containing natural radionuclides and from various research activities. It has been decided in the overall interest of safety and security to develop a radioactive waste disposal facility to accommodate the low level and short lived intermediate level waste, which make up the bulk of the waste, other than mining and minerals processing residues. A site selection process has been undertaken and environmental impact statement report prepared and approved. A licence application has been submitted to the national nuclear regulatory authority, the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA) for siting, construction and operation of the facility. In order to assist the CEO of ARPANSA with his deliberations in this regard a request was made to the IAEA, in terms of its statutory mandate to establish international safety standards for radioactive waste safety and to provide for their application, to undertake an international peer review of the licence application and to advise the CEO accordingly. The outcome and recommendations of this peer review are presented in the report

  7. Evaluation of an International Disaster Relief Team After Participation in an ASEAN Regional Forum Disaster Relief Exercise.

    Science.gov (United States)

    Lee, Jeong Il; Lee, Kang Hyun; Kim, Oh Hyun; Cha, Yong Sung; Hwang, Sung Oh; Kim, Hyun; Cha, Kyung Chul

    2016-10-01

    Devastating disasters around the world directly contribute to significant increases in human mortality and economic costs. The objective of this study was to examine the current state of the Korea Disaster Relief Team that participated in an international training module. The whole training period was videotaped in order to observe and evaluate the respondents. The survey was carried out after completion of the 3-day training, and the scores were reported by use of a 5-point Likert scale. A total of 43 respondents were interviewed for the survey, and the results showed that the overall preparedness score for international disasters was 3.4±1.6 (mean±SD). The awareness of the Incident Command System for international disasters was shown to be low (3.5±1.1). Higher scores were given to personnel who took on leadership roles in the team and who answered "I knew my duty" (4.4±0.6) in the survey, as well as to the training participants who answered "I clearly knew my duty" (4.5±0.5). The preparedness level of the Korea Disaster Relief Team was shown to be insufficient, whereas understanding of the roles of leaders and training participants in the rescue team was found to be high. It is assumed that the preparedness level for disaster relief must be improved through continued training. (Disaster Med Public Health Preparedness. 2016;1-5).

  8. Optimising the Efficacy of Hybrid Academic Teams: Lessons from a Systematic Review Process

    Science.gov (United States)

    Lake, Warren; Wallin, Margie; Boyd, Bill; Woolcott, Geoff; Markopoulos, Christos; Boyd, Wendy; Foster, Alan

    2018-01-01

    Undertaking a systematic review can have many benefits, beyond any theoretical or conceptual discoveries pertaining to the underlying research question. This paper explores the value of utilising a hybrid academic team when undertaking the systematic review process, and shares a range of practical strategies. The paper also comments on how such a…

  9. Effects of Plyometric Training on Physical Fitness in Team Sport Athletes: A Systematic Review.

    Science.gov (United States)

    Slimani, Maamer; Chamari, Karim; Miarka, Bianca; Del Vecchio, Fabricio B; Chéour, Foued

    2016-12-01

    Plyometric training (PT) is a very popular form of physical conditioning of healthy individuals that has been extensively studied over the last decades. In this article, we critically review the available literature related to PT and its effects on physical fitness in team sport athletes. We also considered studies that combined PT with other popular training modalities (e.g. strength/sprint training). Generally, short-term PT (i.e. 2-3 sessions a week for 4-16 weeks) improves jump height, sprint and agility performances in team sport players. Literature shows that short PT (plyometric exercises and the bilateral and unilateral jumps could improve these performances more than the use of single plyometric drills or traditional PT. Thus, the present review shows a greater effect of PT alone on jump and sprint (30 m sprint performance only) performances than the combination of PT with sprint/strength training. Although many issues related to PT remain to be resolved, the results presented in this review allow recommending the use of well-designed and sport-specific PT as a safe and effective training modality for improving jumping and sprint performance as well as agility in team sport athletes.

  10. Making progress with the automation of systematic reviews: principles of the International Collaboration for the Automation of Systematic Reviews (ICASR).

    Science.gov (United States)

    Beller, Elaine; Clark, Justin; Tsafnat, Guy; Adams, Clive; Diehl, Heinz; Lund, Hans; Ouzzani, Mourad; Thayer, Kristina; Thomas, James; Turner, Tari; Xia, Jun; Robinson, Karen; Glasziou, Paul

    2018-05-19

    Systematic reviews (SR) are vital to health care, but have become complicated and time-consuming, due to the rapid expansion of evidence to be synthesised. Fortunately, many tasks of systematic reviews have the potential to be automated or may be assisted by automation. Recent advances in natural language processing, text mining and machine learning have produced new algorithms that can accurately mimic human endeavour in systematic review activity, faster and more cheaply. Automation tools need to be able to work together, to exchange data and results. Therefore, we initiated the International Collaboration for the Automation of Systematic Reviews (ICASR), to successfully put all the parts of automation of systematic review production together. The first meeting was held in Vienna in October 2015. We established a set of principles to enable tools to be developed and integrated into toolkits.This paper sets out the principles devised at that meeting, which cover the need for improvement in efficiency of SR tasks, automation across the spectrum of SR tasks, continuous improvement, adherence to high quality standards, flexibility of use and combining components, the need for a collaboration and varied skills, the desire for open source, shared code and evaluation, and a requirement for replicability through rigorous and open evaluation.Automation has a great potential to improve the speed of systematic reviews. Considerable work is already being done on many of the steps involved in a review. The 'Vienna Principles' set out in this paper aim to guide a more coordinated effort which will allow the integration of work by separate teams and build on the experience, code and evaluations done by the many teams working across the globe.

  11. Diversity and inequality in management teams : A review and integration of research on vertical and horizontal member differences

    NARCIS (Netherlands)

    Bunderson, J. Stuart; van der Vegt, Gerben S.

    The promise and perils of heterogeneity in team member characteristics has been and continues to be one of the central questions in research on management teams. We review the literature on member heterogeneity within management teams, with a focus on summarizing and integrating research on both

  12. An International Peer Review of the Safety Options Dossier of the Project for Disposal of Radioactive Waste in Deep Geological Formations (Cigéo). Final Report of the IAEA International Review Team November 2016

    International Nuclear Information System (INIS)

    2017-07-01

    The French Nuclear Safety Authority (Autorité de sûreté nucléaire, ASN) is preparing the evaluation of a licence application for the creation of a deep geological disposal facility in 2018, called Cigéo, for intermediate level, high level and long lived radioactive waste. This licence is preceded by the submission of a Safety Options Dossier to ASN, which provides the French National Radioactive Waste Management Agency (Agence nationale pour la gestion des déchets radioactifs, Andra) the possibility to receive advice from ASN on the preparation of the licence application on the safety principles and approach. The Safety Options Dossier sets out the chosen objectives, concepts and principles for ensuring the safety of the facility. ASN requested the IAEA to organize an international peer review of the Safety Options Dossier. This publication presents the consensus view of the international group of experts convened by the IAEA to conduct the review against the relevant IAEA safety standards and proven international practice and experience. The experts acted in a personal capacity and the views expressed do not necessarily reflect those of the IAEA, the governments of the nominating Member States or the nominating organizations. The basis of this peer review is the set of documents provided by Andra, as the agency responsible for the development of the Cigéo project and for its safety. Consequently, the findings of the reviews are addressed directly to Andra. This publication, however, is primarily submitted to ASN to review the outcomes of the Andra project.

  13. Global positioning systems (GPS) and microtechnology sensors in team sports: a systematic review.

    Science.gov (United States)

    Cummins, Cloe; Orr, Rhonda; O'Connor, Helen; West, Cameron

    2013-10-01

    Use of Global positioning system (GPS) technology in team sport permits measurement of player position, velocity, and movement patterns. GPS provides scope for better understanding of the specific and positional physiological demands of team sport and can be used to design training programs that adequately prepare athletes for competition with the aim of optimizing on-field performance. The objective of this study was to conduct a systematic review of the depth and scope of reported GPS and microtechnology measures used within individual sports in order to present the contemporary and emerging themes of GPS application within team sports. A systematic review of the application of GPS technology in team sports was conducted. We systematically searched electronic databases from earliest record to June 2012. Permutations of key words included GPS; male and female; age 12-50 years; able-bodied; and recreational to elite competitive team sports. The 35 manuscripts meeting the eligibility criteria included 1,276 participants (age 11.2-31.5 years; 95 % males; 53.8 % elite adult athletes). The majority of manuscripts reported on GPS use in various football codes: Australian football league (AFL; n = 8), soccer (n = 7), rugby union (n = 6), and rugby league (n = 6), with limited representation in other team sports: cricket (n = 3), hockey (n = 3), lacrosse (n = 1), and netball (n = 1). Of the included manuscripts, 34 (97 %) detailed work rate patterns such as distance, relative distance, speed, and accelerations, with only five (14.3 %) reporting on impact variables. Activity profiles characterizing positional play and competitive levels were also described. Work rate patterns were typically categorized into six speed zones, ranging from 0 to 36.0 km·h⁻¹, with descriptors ranging from walking to sprinting used to identify the type of activity mainly performed in each zone. With the exception of cricket, no standardized speed zones or definitions were observed within or

  14. Team situation awareness in nuclear power plant process control: A literature review, task analysis and future research

    International Nuclear Information System (INIS)

    Ma, R.; Kaber, D. B.; Jones, J. M.; Starkey, R. L.

    2006-01-01

    Operator achievement and maintenance of situation awareness (SA) in nuclear power plant (NPP) process control has emerged as an important concept in defining effective relationships between humans and automation in this complex system. A literature review on factors influencing SA revealed several variables to be important to team SA, including the overall task and team goals, individual tasks, team member roles, and the team members themselves. Team SA can also be adversely affected by a range of factors, including stress, mental over- or under-loading, system design (including human-machine interface design), complexity, human error in perception, and automation. Our research focused on the analysis of 'shared' SA and team SA among an assumed three-person, main-control-room team. Shared SA requirements represent the knowledge that is held in common by NPP operators, and team SA represents the collective, unique knowledge of all operators. The paper describes an approach to goal-directed task analysis (GDTA) applied to NPP main control room operations. In general, the GDTA method reveals critical operator decision and information requirements. It identifies operator SA requirements relevant to performing complex systems control. The GDTA can reveal requirements at various levels of cognitive processing, including perception, comprehension and projection, in NPP process control. Based on the literature review and GDTA approach, a number of potential research issues are proposed with an aim toward understanding and facilitating team SA in NPP process control. (authors)

  15. Effectiveness of team nursing compared with total patient care on staff wellbeing when organizing nursing work in acute care wards: a systematic review.

    Science.gov (United States)

    King, Allana; Long, Lesley; Lisy, Karolina

    2015-11-01

    . There were no statistically significant differences observed in any study in the overall job satisfaction of nurses using a team nursing model compared with a total patient care model. Some differences in job satisfaction were however observed within different subgroups of nurses. There were no statistically significant differences in either stress or job tension. Within the selected studies, the specific outcomes of absenteeism and burnout were not addressed. Due to the limited number of quantitative studies identified for inclusion in this systematic review it is not possible to determine whether organizing nursing work in a team nursing or total patient care model is more effective in terms of staff wellbeing in acute care settings. Neither a team nursing or total patient care model had a significant influence on nurses' overall job satisfaction, stress levels or staff turnover. This review could not ascertain if the type of model of care affects absenteeism or burnout as these were not addressed in any of the identified studies.Caution should be taken when evaluating which model of care is appropriate and the decision needs to incorporate staff experience levels and staff skill mix. There needs to be clear definition of nursing roles.This review demonstrates the need for further quantitative studies of these models of care that are well designed with sufficient sample sizes to allow for attrition of participants, and that explore the impact each model has on nurse's wellbeing, in particular, studies that address burnout and absenteeism. There is a need for consistent terminology to allow for future comparison and research to occur at an international level. Future studies on models of care should include economic analysis to fully inform policy and practice.

  16. External Peer Review Team Report Underground Testing Area Subproject for Frenchman Flat, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Sam Marutzky

    2010-09-01

    An external peer review was conducted to review the groundwater models used in the corrective action investigation stage of the Underground Test Area (UGTA) subproject to forecast zones of potential contamination in 1,000 years for the Frenchman Flat area. The goal of the external peer review was to provide technical evaluation of the studies and to assist in assessing the readiness of the UGTA subproject to progress to monitoring activities for further model evaluation. The external peer review team consisted of six independent technical experts with expertise in geology, hydrogeology,'''groundwater modeling, and radiochemistry. The peer review team was tasked with addressing the following questions: 1. Are the modeling approaches, assumptions, and model results for Frenchman Flat consistent with the use of modeling studies as a decision tool for resolution of environmental and regulatory requirements? 2. Do the modeling results adequately account for uncertainty in models of flow and transport in the Frenchman Flat hydrological setting? a. Are the models of sufficient scale/resolution to adequately predict contaminant transport in the Frenchman Flat setting? b. Have all key processes been included in the model? c. Are the methods used to forecast contaminant boundaries from the transport modeling studies reasonable and appropriate? d. Are the assessments of uncertainty technically sound and consistent with state-of-the-art approaches currently used in the hydrological sciences? 3. Are the datasets and modeling results adequate for a transition to Corrective Action Unit monitoring studies—the next stage in the UGTA strategy for Frenchman Flat? The peer review team is of the opinion that, with some limitations, the modeling approaches, assumptions, and model results are consistent with the use of modeling studies for resolution of environmental and regulatory requirements. The peer review team further finds that the modeling studies have accounted

  17. External Peer Review Team Report Underground Testing Area Subproject for Frenchman Flat, Revision 1

    International Nuclear Information System (INIS)

    Marutzky, Sam

    2010-01-01

    An external peer review was conducted to review the groundwater models used in the corrective action investigation stage of the Underground Test Area (UGTA) subproject to forecast zones of potential contamination in 1,000 years for the Frenchman Flat area. The goal of the external peer review was to provide technical evaluation of the studies and to assist in assessing the readiness of the UGTA subproject to progress to monitoring activities for further model evaluation. The external peer review team consisted of six independent technical experts with expertise in geology, hydrogeology,'groundwater modeling, and radiochemistry. The peer review team was tasked with addressing the following questions: 1. Are the modeling approaches, assumptions, and model results for Frenchman Flat consistent with the use of modeling studies as a decision tool for resolution of environmental and regulatory requirements? 2. Do the modeling results adequately account for uncertainty in models of flow and transport in the Frenchman Flat hydrological setting? a. Are the models of sufficient scale/resolution to adequately predict contaminant transport in the Frenchman Flat setting? b. Have all key processes been included in the model? c. Are the methods used to forecast contaminant boundaries from the transport modeling studies reasonable and appropriate? d. Are the assessments of uncertainty technically sound and consistent with state-of-the-art approaches currently used in the hydrological sciences? 3. Are the datasets and modeling results adequate for a transition to Corrective Action Unit monitoring studies the next stage in the UGTA strategy for Frenchman Flat? The peer review team is of the opinion that, with some limitations, the modeling approaches, assumptions, and model results are consistent with the use of modeling studies for resolution of environmental and regulatory requirements. The peer review team further finds that the modeling studies have accounted for uncertainty in

  18. The Team Climate Inventory: application in hospital teams and methodological considerations.

    Science.gov (United States)

    Ouwens, M; Hulscher, M; Akkermans, R; Hermens, R; Grol, R; Wollersheim, H

    2008-08-01

    To test the validity, reliability and discriminating capacity of an instrument to assess team climate, the Team Climate Inventory (TCI), in a sample of Dutch hospital teams. The TCI is based on a four-factor theory of team climate for innovation. Validation study. Hospital teams in The Netherlands. 424 healthcare professionals; 355 nurses working in 22 nursing teams and 69 nurses and doctors working in 14 quality-improvement teams. Exploratory and confirmatory factor analyses, Pearson's product moment correlations, internal homogeneity of the TCI scales based on Cronbach alpha, and the TCI capability to discriminate between two types of healthcare teams, namely nursing teams and quality-improvement teams. The validity test revealed the TCI's five-factor structure and moderate data fit. The Cronbach alphas of the five scales showed acceptable reliabilities. The TCI discriminated between nursing teams and quality-improvement teams. The mean scores of quality-improvement teams were all significantly higher than those of the nursing teams. Patient care teams are essential for high-quality patient care, and team climate is an important characteristic of successful teams. This study shows that the TCI is a valid, reliable and discriminating self-report measure of team climate in hospital teams. The TCI can be used as a quality-improvement tool or in quality-of-care research.

  19. MEASURING PRODUCTIVITY OF SOFTWARE DEVELOPMENT TEAMS

    Directory of Open Access Journals (Sweden)

    Goparaju Purna Sudhakar

    2012-02-01

    Full Text Available This paper gives an exhaustive literature review of the techniques and models available tomeasure the productivity of software development teams. Definition of productivity, measuringindividual programmer’s productivity, and measuring software development team productivity arediscussed. Based on the literature review it was found that software productivity measurement canbe done using SLOC (Source Lines of Code, function points, use case points, object points, andfeature points. Secondary research findings indicate that the team size, response time, taskcomplexity, team climate and team cohesion have an impact on software development teamproductivity. List of factors affecting the software development team productivity are studied andreviewed.

  20. [Developing team reflexivity as a learning and working tool for medical teams].

    Science.gov (United States)

    Riskin, Arieh; Bamberger, Peter

    2014-01-01

    Team reflexivity is a collective activity in which team members review their previous work, and develop ideas on how to modify their work behavior in order to achieve better future results. It is an important learning tool and a key factor in explaining the varying effectiveness of teams. Team reflexivity encompasses both self-awareness and agency, and includes three main activities: reflection, planning, and adaptation. The model of briefing-debriefing cycles promotes team reflexivity. Its key elements include: Pre-action briefing--setting objectives, roles, and strategies the mission, as well as proposing adaptations based on what was previously learnt from similar procedures; Post-action debriefing--reflecting on the procedure performed and reviewing the extent to which objectives were met, and what can be learnt for future tasks. Given the widespread attention to team-based work systems and organizational learning, efforts should be made toward ntroducing team reflexivity in health administration systems. Implementation could be difficult because most teams in hospitals are short-lived action teams formed for a particular event, with limited time and opportunity to consciously reflect upon their actions. But it is precisely in these contexts that reflexive processes have the most to offer instead of the natural impulsive collective logics. Team reflexivity suggests a potential solution to the major problems of iatorgenesis--avoidable medical errors, as it forces all team members to participate in a reflexive process together. Briefing-debriefing technology was studied mainly in surgical teams and was shown to enhance team-based learning and to improve quality-related outcomes and safety.

  1. SCART guidelines. Reference report for IAEA Safety Culture Assessment Review Team (SCART)

    International Nuclear Information System (INIS)

    2008-01-01

    The IAEA Director General stressed the role of safety culture in his concluding remarks at the Meeting of the Contracting Parties to the Convention on Nuclear Safety in 2002: 'As we have learned in other areas, it is not enough simply to have a structure; it is not enough to say that we have the necessary laws and the appropriate regulatory bodies. All these are important, but equally important is that we have in place a safety culture that gives effect to the structure that we have developed. To me, effectiveness and transparency are keys. So, it is an issue which I am pleased to see, you are giving the attention it deserves and we will continue to work with you in clarifying, developing and applying safety culture through our programmes and through our technical cooperation activities.' The concept of safety culture was initially developed by the International Nuclear Safety Advisory Group (INSAG) after the Chernobyl accident in 1986. Since then the IAEA's perspective of safety culture has expanded with time as its recognition of the complexities of the concept developed. Safety culture is considered to be specific organizational culture in all types of organizations with activities that give rise to radiation risks. The aim is to make safety culture strong and sustainable, so that safety becomes a primary focus for all activities in such organizations, even for those, which might not look safety-related at first. SCART (Safety Culture Assessment Review Team) is a safety review service, which reflects the expressed interest of Members States for methods and tools for safety culture assessment. It is a replacement for the earlier service ASCOT (Assessment of Safety Culture in Organizations Team). The IAEA Safety Fundamentals, Requirements and Guides (Safety Standards) are the basis for the SCART Safety Review Service. The reports of INSAG, identifying important current nuclear safety issues, serve also as references during a SCART mission. SCART missions are based

  2. Teaching nurses teamwork: Integrative review of competency-based team training in nursing education.

    Science.gov (United States)

    Barton, Glenn; Bruce, Anne; Schreiber, Rita

    2017-12-20

    Widespread demands for high reliability healthcare teamwork have given rise to many educational initiatives aimed at building team competence. Most effort has focused on interprofessional team training however; Registered Nursing teams comprise the largest human resource delivering direct patient care in hospitals. Nurses also influence many other health team outcomes, yet little is known about the team training curricula they receive, and furthermore what specific factors help translate teamwork competency to nursing practice. The aim of this review is to critically analyse empirical published work reporting on teamwork education interventions in nursing, and identify key educational considerations enabling teamwork competency in this group. CINAHL, Web of Science, Academic Search Complete, and ERIC databases were searched and detailed inclusion-exclusion criteria applied. Studies (n = 19) were selected and evaluated using established qualitative-quantitative appraisal tools and a systematic constant comparative approach. Nursing teamwork knowledge is rooted in High Reliability Teams theory and Crew or Crisis Resource Management sources. Constructivist pedagogy is used to teach, practice, and refine teamwork competency. Nursing teamwork assessment is complex; involving integrated yet individualized determinations of knowledge, skills, and attitudes. Future initiatives need consider frontline leadership, supportive followership and skilled communication emphasis. Collective stakeholder support is required to translate teamwork competency into nursing practice. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Is Team Sport the Key to Getting Everybody Active, Every Day? A Systematic Review of Physical Activity Interventions Aimed at Increasing Girls' Participation in Team Sport.

    Science.gov (United States)

    Allison, Rosalie; Bird, Emma L; McClean, Stuart

    2017-01-01

    It is estimated that 21% of boys and 16% of girls in England meet recommended physical activity guidelines. Team sport has the potential to increase physical activity levels; however, studies show that gender-based factors can influence girls' participation in team sport. Furthermore, evidence for the effectiveness of interventions promoting team sport among girls is limited. This systematic review aimed to assess the impact of physical activity interventions on secondary school-aged girls' (aged 11-18 years) participation in team sport and to identify potential strategies for increasing participation. Electronic databases and grey literature were systematically searched for studies of interventions targeting team sport participation among girls in the UK. Results were exported to Refworks, duplicates removed and eligible studies identified. Extracted data included: participant details, such as sample size and age; components of the intervention; outcomes assessed; and each study was quality appraised. Due to heterogeneity across studies, results were presented narratively. Four studies sourced from the grey literature met the inclusion criteria. Findings suggest that physical activity interventions can encourage girls to try new sports, but evidence is limited in relation to sustained participation. Potential strategies for promoting participation included: consultation with girls, implementation of appropriate peer-leaders and friendship group strategies, early intervention and consideration of intervention setting. This review highlights the limited availability of evidence on the effectiveness of physical activity interventions for promoting team sport participation among girls in the UK. Findings indicate that future research is needed to improve the methodological quality of complex intervention evaluation. Physical activity interventions may have the potential to encourage girls to try team sport, but their impact on sustained participation, and subsequent

  4. Team climate and quality of care in primary health care: a review of studies using the Team Climate Inventory in the United Kingdom.

    Science.gov (United States)

    Goh, Teik T; Eccles, Martin P

    2009-10-29

    Attributes of teams could affect the quality of care delivered in primary care. The aim of this study was to systematically review studies conducted within the UK NHS primary care that have measured team climate using the Team Climate Inventory (TCI), and to describe, if reported, the relationship between the TCI and measures of quality of care. The databases MEDLINE, EMBASE, and CINAHL were searched. The reference lists of included article were checked and one relevant journal was hand-searched. Eight papers were included. Three studies used a random sample; the remaining five used convenience or purposive samples. Six studies were cross sectional surveys, whilst two were before and after studies. Four studies examined the relationship between team climate and quality of care. Only one study found a positive association between team climate and higher quality care in patients with diabetes, positive patient satisfaction and self-reported effectiveness. While the TCI has been used to measure team attributes in primary care settings in the UK it is difficult to generalise from these data. A small number of studies reported higher TCI scores being associated with only certain aspects of quality of care; reasons for the pattern of association are unclear. There are a number of methodological challenges to conducting such studies in routine service settings. Further research is needed in order to understand how to measure team functioning in relation to quality of care.

  5. Team climate and quality of care in primary health care: a review of studies using the Team Climate Inventory in the United Kingdom

    Directory of Open Access Journals (Sweden)

    Goh Teik T

    2009-10-01

    Full Text Available Abstract Background Attributes of teams could affect the quality of care delivered in primary care. The aim of this study was to systematically review studies conducted within the UK NHS primary care that have measured team climate using the Team Climate Inventory (TCI, and to describe, if reported, the relationship between the TCI and measures of quality of care. Findings The databases MEDLINE, EMBASE, and CINAHL were searched. The reference lists of included article were checked and one relevant journal was hand-searched. Eight papers were included. Three studies used a random sample; the remaining five used convenience or purposive samples. Six studies were cross sectional surveys, whilst two were before and after studies. Four studies examined the relationship between team climate and quality of care. Only one study found a positive association between team climate and higher quality care in patients with diabetes, positive patient satisfaction and self-reported effectiveness. Conclusion While the TCI has been used to measure team attributes in primary care settings in the UK it is difficult to generalise from these data. A small number of studies reported higher TCI scores being associated with only certain aspects of quality of care; reasons for the pattern of association are unclear. There are a number of methodological challenges to conducting such studies in routine service settings. Further research is needed in order to understand how to measure team functioning in relation to quality of care.

  6. International Peer Reviews of Design Basis

    International Nuclear Information System (INIS)

    Hughes, Peter

    2013-01-01

    International peer reviews: Design and safety assessment review service: - Review of design requirements; - Review in support of licensing; - Review in support of severe accident management; - Review in support of modifications; - Review in relation to periodic safety, or life extension; - Reviews take place at any time in NPP lifecycle from concept, through design and operations

  7. Caseload management methods for use within district nursing teams: a literature review.

    Science.gov (United States)

    Roberson, Carole

    2016-05-01

    Effective and efficient caseload management requires extensive skills to ensure that patients receive the right care by the right person at the right time. District nursing caseloads are continually increasing in size and complexity, which requires specialist district nursing knowledge and skills. This article reviews the literature related to caseload management with the aim of identifying the most effective method for district nursing teams. The findings from this review are that there are different styles and methods of caseload management. The literature review was unable to identify a single validated tool or method, but identified themes for implementing effective caseload management, specifically caseload analysis; workload measurement; work allocation; service and practice development and workforce planning. This review also identified some areas for further research.

  8. Introducing embedded indigenous psychological support teams: a suggested addition to psychological first aid in an international context.

    Science.gov (United States)

    Edwards-Stewart, Amanda; Ahmad, Zeba S; Thoburn, John W; Furman, Rich; Lambert, Ashly J; Shelly, Lauren; Gunn, Ginger

    2012-01-01

    The current article introduces Embedded Indigenous Psychological Support Teams (IPST) as a possible addition to current disaster relief efforts. This article highlights psychological first aid in an international context by drawing on mainstream disaster relief models such as The American Red Cross, Critical Incident Stress Management, and Flexible Psychological First Aid. IPST are explained as teams utilizing techniques from both CISM and FPFA with a focus on resiliency. It is currently theorized that in utilizing IPST existing disaster relief models may be more effective in mitigating negative physical or mental health consequences post-disaster.

  9. Nirex methodology for scenario and conceptual model development. An international peer review

    International Nuclear Information System (INIS)

    1999-06-01

    Nirex has responsibilities for nuclear waste management in the UK. The company's top level objectives are to maintain technical credibility on deep disposal, to gain public acceptance for a deep geologic repository, and to provide relevant advice to customers on the safety implications of their waste packaging proposals. Nirex utilizes peer reviews as appropriate to keep its scientific tools up-to-date and to periodically verify the quality of its products. The NEA formed an International Review Team (IRT) consisting of four internationally recognised experts plus a member of the NEA Secretariat. The IRT performed an in-depth analysis of five Nirex scientific reports identified in the terms of reference of the review. The review was to primarily judge whether the Nirex methodology provides an adequate framework to support the building of a future licensing safety case. Another objective was to judge whether the methodology could aid in establishing a better understanding, and, ideally, enhance acceptance of a repository among stakeholders. Methodologies for conducting safety assessments include at a very basic level the identification of features, events, and processes (FEPs) relevant to the system at hand, their convolution in scenarios for analysis, and the formulation of conceptual models to be addressed through numerical modelling. The main conclusion of the IRT is that Nirex has developed a potentially sound methodology for the identification and analysis of FEPs and for the identification of conceptual model needs and model requirements. The work is still in progress and is not yet complete. (R.P.)

  10. The post-closure radiological safety case for a spent fuel repository in Sweden - An international peer review of the SKB license-application study of March 2011

    International Nuclear Information System (INIS)

    2012-01-01

    Sweden is at the forefront among countries developing plans for a deep geological repository of highly radioactive waste. There is no such repository in operation yet worldwide, but Sweden, Finland and France are approaching the licensing stage. At the request of the Swedish government, the NEA organised an international peer review of the post-closure radiological safety case produced by the Swedish Nuclear Fuel and Waste Management Company (SKB) in support of the application for a general licence to construct and operate a spent nuclear fuel geological repository in the municipality of Oesthammar. The purpose of the review was to help the Swedish government, the public and relevant organisations by providing an international reference regarding the maturity of SKB's spent fuel disposal programme vis-a-vis best practices in long-term disposal safety and radiological protection. The International Review Team (IRT) consisted of ten international specialists, who were free of conflict of interest with the SKB and brought complementary expertise to the review. This report provides the background and findings of the international peer review. The review's findings are presented at several levels of detail in order to be accessible to both specialist and non-specialist readers

  11. International Physical Protection Advisory Service

    International Nuclear Information System (INIS)

    Soo Hoo, M.S.; Ek, D.; Hageman, A.; Jenkin, T.; Price, C.; Weiss, B.

    1998-01-01

    Since its inception in 1996, the purpose of the International Physical Protection Advisory Service (IPPAS) has been to provide advice and assistance to International Atomic Energy Agency (IAEA) Member States on strengthening and enhancing the effectiveness of their state system of physical protection of nuclear materials and facilities. Since the protection of nuclear materials and facilities is a Member State's responsibility, participation within the IPPAS program is voluntary. At the request of a Member State, the IAEA forms a multinational IPPAS team consisting of physical protection specialists. These specialists have broad experience in physical protection system design, implementation, and regulatory oversight. The exact make-up of the team depends upon the needs of the requesting state. IPPAS missions to participating states strive to compare the domestic procedures and practices of the state against international physical protection guidelines (IAEA Information Circular 225) and internationally accepted practice. The missions utilize a top to bottom approach and begin by reviewing the legal and regulatory structure and conclude with reviews of the implementation of the state regulations and international guidelines at individual facilities. IPPAS findings are treated as IAEA Safeguards Confidential Information. To date, IPPAS missions have been concluded in Slovenia, Bulgaria, Romania, Hungary, and Poland

  12. Dietetic- nutritional, physical and physiological recovery methods post-competition in team sports. A review.

    Science.gov (United States)

    Terrados, Nicolas; Mielgo-Ayuso, Juan; Delextrat, Anne; Ostojic, Sergej M; Calleja-González, Julio

    2018-03-27

    To a proper recovery, is absolutely necessary to know that athletes with enhanced recovery after maximal exercise are likely to perform better in sports. Recovery strategies are commonly used in team sports despite limited scientific evidence to support their effectiveness in facilitating optimal recovery and the players spend a much greater proportion of their time recovering than they do in training. According to authors, some studies investigated the effect of recovery strategies on physical performance in team sports, lack of experimental studies about the real origin of the fatigue, certify the need for further study this phenomenon. Thus, developing effective methods for helping athletes to recover is deemed essential. Therefore, the aim of this review is provide information for his practical application, based on scientific evidence about recovery in team sports.

  13. Adult congenital heart disease nurse coordination: Essential skills and role in optimizing team-based care a position statement from the International Society for Adult Congenital Heart Disease (ISACHD).

    Science.gov (United States)

    Sillman, Christina; Morin, Joanne; Thomet, Corina; Barber, Deena; Mizuno, Yoshiko; Yang, Hsiao-Ling; Malpas, Theresa; Flocco, Serena Francesca; Finlay, Clare; Chen, Chi-Wen; Balon, Yvonne; Fernandes, Susan M

    2017-02-15

    Founded in 1992, the International Society for Adult Congenital Heart Disease (ISACHD) is the leading global organization of professionals dedicated to pursuing excellence in the care of adults with congenital heart disease (CHD) worldwide. Among ISACHD's objectives is to "promote a holistic team-based approach to the care of the adult with CHD that is comprehensive, patient-centered, and interdisciplinary" (http://www.isachd.org). This emphasis on team-based care reflects the fact that adults with CHD constitute a heterogeneous population with a wide spectrum of disease complexity, frequent association with other organ involvement, and varied co-morbidities and psychosocial issues. Recognizing the vital role of the adult CHD (ACHD) nurse coordinator (ACHD-NC) in optimizing team-based care, ISACHD established a task force to elucidate and provide guidance on the roles and responsibilities of the ACHD-NC. Acknowledging that nursing roles can vary widely from region to region based on factors such as credentials, scopes of practice, regulations, and local culture and tradition, an international panel was assembled with experts from North America, Europe, East Asia, and Oceania. The writing committee was tasked with reviewing key aspects of the ACHD-NC's role in team-based ACHD care. The resulting ISACHD position statement addresses the ACHD-NC's role and skills required in organizing, coordinating, and facilitating the care of adults with CHD, holistic assessment of the ACHD patient, patient education and counseling, and support for self-care management and self-advocacy. Crown Copyright © 2016. Published by Elsevier B.V. All rights reserved.

  14. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  15. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  16. The value of multidisciplinary team meetings for patients with gastrointestinal malignancies : A systematic review

    NARCIS (Netherlands)

    Basta, Y.L.; Bolle, S.; Fockens, P.; Tytgat, K.M.A.J.

    Introduction The incidence of gastrointestinal (GI) cancer is rising and most patients with GI malignancies are discussed by a multidisciplinary team (MDT). We performed a systematic review to assess whether MDTs for patients with GI malignancies can correctly change diagnosis, tumor stage and

  17. The Value of Multidisciplinary Team Meetings for Patients with Gastrointestinal Malignancies: A Systematic Review

    NARCIS (Netherlands)

    Basta, Yara L.; Bolle, Sifra; Fockens, Paul; Tytgat, Kristien M. A. J.

    2017-01-01

    Introduction. The incidence of gastrointestinal (GI) cancer is rising and most patients with GI malignancies are discussed by a multidisciplinary team (MDT). We performed a systematic review to assess whether MDTs for patients with GI malignancies can correctly change diagnosis, tumor stage and

  18. Wound-care teams for preventing and treating pressure ulcers.

    Science.gov (United States)

    Moore, Zena E H; Webster, Joan; Samuriwo, Ray

    2015-09-16

    Pressure ulcers, which are localised injury to the skin or underlying tissue, or both, occur when people are unable to reposition themselves to relieve pressure on bony prominences. Pressure ulcers are often difficult to heal, painful and impact negatively on the individual's quality of life. The cost implications of pressure ulcer treatment are considerable, compounding the challenges in providing cost effective, efficient health service delivery. International guidelines suggest that to prevent and manage pressure ulcers successfully a team approach is required. Therefore, this review has been conducted to clarify the role of wound-care teams in the prevention and management of pressure ulcers. To assess the impact of wound-care teams in preventing and treating pressure ulcers in people of any age, nursed in any healthcare setting. In April 2015 we searched: The Cochrane Wounds Group Specialised Register; The Cochrane Central Register of Controlled Trials (CENTRAL) (The Cochrane Library); Ovid MEDLINE; Ovid MEDLINE (In-Process & Other Non-Indexed Citations); Ovid EMBASE and EBSCO CINAHL. There were no restrictions with respect to language, date of publication or study setting. We considered RCTs that evaluated the effect of any configuration of wound-care teams in the treatment or prevention of pressure ulcers. Two review authors independently assessed titles and, where available, abstracts of the studies identified by the search strategy for their eligibility. We obtained full versions of potentially relevant studies and two review authors independently screened these against the inclusion criteria. We identified no studies that met the inclusion criteria. We set out to evaluate the RCT evidence pertaining to the impact of wound-care teams on the prevention and management of pressure ulcers. However, no studies met the inclusion criteria. There is a lack of evidence concerning whether wound-care teams make a difference to the incidence or healing of pressure

  19. The effectiveness of crisis resolution/home treatment teams for older people with mental health problems: a systematic review and scoping exercise.

    Science.gov (United States)

    Toot, Sandeep; Devine, Mike; Orrell, Martin

    2011-12-01

    To assess the effectiveness of crisis resolution/home treatment services for older people with mental health problems. A systematic review was conducted to report on the effectiveness of crisis resolution/home treatment teams (CRHTTs) for older people with mental health problems. As part of the review, we also carried out a scoping exercise to assess the typologies of older people's CRHTTs in practice, and to review these in the context of policy and research findings. The literature contains Grade C evidence, according to the Oxford Centre of Evidence Based Medicine (CEBM) guidelines, that CRHTTs are effective in reducing numbers of admissions to hospitals. Outcomes such as length of hospital stay and maintenance of community residence were reviewed but evidence was inadequate for drawing conclusions. The scoping exercise defined three types of home treatment service model: generic home treatment teams; specialist older adults home treatment teams; and intermediate care services. These home treatment teams seemed to be effectively managing crises and reducing admissions. This review has shown a lack of evidence for the efficacy of crisis resolution/home treatment teams in supporting older people with mental health problems to remain at home. There is clearly a need for a randomised controlled trial to establish the efficacy of crisis resolution/home treatment services for older people with mental health problems, as well as a more focussed assessment of the different home treatment service models which have developed in the UK. Copyright © 2011 John Wiley & Sons, Ltd.

  20. Final Report of the NASA Technology Readiness Assessment (TRA) Study Team

    Science.gov (United States)

    Hirshorn, Steven; Jefferies, Sharon

    2016-01-01

    The material in this report covers the results on the NASA-wide TRA team, who are responsible for ascertaining the full extent of issues and ambiguities pertaining to TRATRL and to provide recommendations for mitigation. The team worked for approximately 6 months to become knowledgeable on the current TRATRL process and guidance and to derive recommendations for improvement.The team reviewed the TRA processes of other government agencies (OGA), including international agencies, and found that while the high-level processes are similar, the NASA process has a greater level of detail. Finally, NASA’s HQ OCT continues to monitor the GAO’s efforts to produce a TRA Best Practices Guide, a draft of which was received in February 2016. This Guide could impact the recommendations of this report.

  1. 49 CFR 659.27 - Internal safety and security reviews.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Internal safety and security reviews. 659.27... State Oversight Agency § 659.27 Internal safety and security reviews. (a) The oversight agency shall... safety and security reviews in its system safety program plan. (b) The internal safety and security...

  2. The impact of sleep deprivation in military surgical teams: a systematic review.

    Science.gov (United States)

    Parker, Rachael Sv; Parker, P

    2017-06-01

    Fatigue in military operations leads to safety and operational problems due to a decrease in alertness and performance. The primary method of counteracting the effects of sleep deprivation is to increase nightly sleep time, which in operational situations is not always feasible. History has taught us that surgeons and surgical teams are finite resources that cannot operate on patients indefinitely. A systematic review was conducted using the search terms ' sleep ' and ' deprivation ' examining the impact of sleep deprivation on cognitive performance in military surgical teams. Studies examining outcomes on intensive care patients and subjects with comorbidities were not addressed in this review. Sleep deprivation in any ' out-of-hours ' surgery has a significant impact on overall morbidity and mortality. Sleep deprivation in surgeons and surgical trainees negatively impacts cognitive performance and puts their own and patients' health at risk. All published research lacks consensus when defining ' sleep deprivation ' and ' rested ' states. It is recognised that it would be unethical to conduct a well-designed randomised controlled trial, to determine the effects of fatigue on performance in surgery; however, there is a paucity between surrogate markers and applying simulated results to actual clinical performance. This requires further research. Recommended methods of combating fatigue include: prophylactically ' sleep-banking ' prior to known periods of sleep deprivation, napping, use of stimulant or alerting substances such as modafinil, coordinated work schedules to reduce circadian desynchronisation and regular breaks with enforced rest periods. A forward surgical team will become combat-ineffective after 48 hours of continuous operations. This systematic review recommends implementing on-call periods of no more than 12 hours in duration, with adequate rest periods every 24 hours. Drug therapies and sleep banking may, in the short term, prevent negative

  3. Who should lead a trauma team: surgeon or non surgeon? A systematic review and meta-analysis

    Directory of Open Access Journals (Sweden)

    Shahab Hajibandeh

    2017-05-01

    Full Text Available Background: Presence of a trauma team leader (TTL in the trauma team is associated with positive patient outcomes in major trauma. The TTL is traditionally a surgeon who coordinates the resuscitation and ensures adherence to Advanced Trauma Life Support (ATLS guidelines. The necessity of routine surgical leadership in the resuscitative component of trauma care has been questioned by some authors. Therefore, it remains controversial who should lead the trauma team. We aimed to evaluate outcomes associated with surgeon versus non-surgeon TTLs in management of trauma patients. Methods: In accordance with Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA statement standards, we performed a systematic review. Electronic databases MEDLINE, EMBASE, CINAHL and the Cochrane Central Register of Controlled Trials (CENTRAL were searched to identify randomized and non-randomized studies investigating outcomes associated with surgeon versus non-surgeon TTL in management of trauma patients. The Newcastle-Ottawa scale was used to assess the methodological quality and risk of bias of the selected studies. Fixed-effect model was applied to calculate pooled outcome data. Results: Three retrospective cohort studies, enrolling 2,519 adult major trauma patients, were included. Our analysis showed that there was no difference in survival [odds ratio (OR: 0.82, 95% confidence interval (CI 0.61-1.10, P=0.19] and length of stay when trauma team was led by surgeon or non-surgeon TTLs; however, fewer injuries were missed when the trauma team was led by a surgeon (OR: 0.48, 95% CI 0.25-0.92, P=0.03. Conclusions: Despite constant debate, the comparative evidence about outcomes associated with surgeon and non-surgeon trauma team leader is insufficient. The best available evidence suggests that there is no significant difference in outcomes of surgeon or non-surgeon trauma team leaders. High quality randomized controlled trials are required to compare

  4. Evaluation of internal peer-review to train nurses recruiting to a randomized controlled trial--Internal Peer-review for Recruitment Training in Trials (InterPReTiT).

    Science.gov (United States)

    Mann, Cindy; Delgado, Debbie; Horwood, Jeremy

    2014-04-01

    A discussion and qualitative evaluation of the use of peer-review to train nurses and optimize recruitment practice in a randomized controlled trial. Sound recruitment processes are critical to the success of randomized controlled trials. Nurses recruiting to trials must obtain consent for an intervention that is administered for reasons other than anticipated benefit to the patient. This requires not only patients' acquiescence but also evidence that they have weighed the relevant information in reaching their decision. How trial information is explained is vital, but communication and training can be inadequate. A discussion of a new process to train nurses recruiting to a randomized controlled trial. Literature from 1999-2013 about consenting to trials is included. Over 3 months from 2009-2010, recruiting nurses reviewed recruitment interviews recorded during the pilot phase of a single-site randomized controlled trial and noted content, communication style and interactions. They discussed their findings during peer-review meetings, which were audio-recorded and analysed using qualitative methodology. Peer-review can enhance nurses' training in trial recruitment procedures by supporting development of the necessary communication skills, facilitating consistency in information provision and sharing best practice. Nurse-led peer-review can provide a forum to share communication strategies that will elicit and address participant concerns and obtain evidence of participant understanding prior to consent. Comparing practice can improve consistency and accuracy of trial information and facilitate identification of recruitment issues. Internal peer-review was well accepted and promoted team cohesion. Further evaluation is needed. © 2013 John Wiley & Sons Ltd.

  5. Team Training for Dynamic Cross-Functional Teams in Aviation: Behavioral, Cognitive, and Performance Outcomes.

    Science.gov (United States)

    Littlepage, Glenn E; Hein, Michael B; Moffett, Richard G; Craig, Paul A; Georgiou, Andrea M

    2016-12-01

    This study evaluates the effectiveness of a training program designed to improve cross-functional coordination in airline operations. Teamwork across professional specializations is essential for safe and efficient airline operations, but aviation education primarily emphasizes positional knowledge and skill. Although crew resource management training is commonly used to provide some degree of teamwork training, it is generally focused on specific specializations, and little training is provided in coordination across specializations. The current study describes and evaluates a multifaceted training program designed to enhance teamwork and team performance of cross-functional teams within a simulated airline flight operations center. The training included a variety of components: orientation training, position-specific declarative knowledge training, position-specific procedural knowledge training, a series of high-fidelity team simulations, and a series of after-action reviews. Following training, participants demonstrated more effective teamwork, development of transactive memory, and more effective team performance. Multifaceted team training that incorporates positional training and team interaction in complex realistic situations and followed by after-action reviews can facilitate teamwork and team performance. Team training programs, such as the one described here, have potential to improve the training of aviation professionals. These techniques can be applied to other contexts where multidisciplinary teams and multiteam systems work to perform highly interdependent activities. © 2016, Human Factors and Ergonomics Society.

  6. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2005-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards; - Integrated approach to the provision for the application of safety standards; and - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices; on the capability and reliability of the commissioning and operating personnel; on comprehensive instructions; and on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  7. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2007-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  8. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2008-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  9. The innovative rehabilitation team: an experiment in team building.

    Science.gov (United States)

    Halstead, L S; Rintala, D H; Kanellos, M; Griffin, B; Higgins, L; Rheinecker, S; Whiteside, W; Healy, J E

    1986-06-01

    This article describes an effort by one rehabilitation team to create innovative approaches to team care in a medical rehabilitation hospital. The major arena for implementing change was the weekly patient rounds. We worked to increase patient involvement, developed a rounds coordinator role, used a structured format, and tried to integrate research findings into team decision making. Other innovations included use of a preadmission questionnaire, a discharge check list, and a rounds evaluation questionnaire. The impact of these changes was evaluated using the Group Environment Scale and by analyzing participation in rounds based on verbatim transcripts obtained prior to and 20 months after formation of the Innovative Rehabilitation Team (IRT). The results showed decreased participation by medical personnel during rounds, and increased participation by patients. The rounds coordinator role increased participation rates of staff from all disciplines and the group environment improved within the IRT. These data are compared with similar evaluations made of two other groups, which served as control teams. The problems inherent in making effective, lasting changes in interdisciplinary rehabilitation teams are reviewed, and a plea is made for other teams to explore additional ways to use the collective creativity and resources latent in the team membership.

  10. Project team motyvation

    OpenAIRE

    Jasionis, Dominykas

    2016-01-01

    The term paper is to analyze the formation of the team and its - motyvation, and interviews from four different companies and find out the leaders in terms of your team, and what principle he tries to motivate her. The Tasks of this paper is to review the organization formed by a team; investigate the promotion of employees in enterprises; The four firms interviewed; Assess how you can work in different organizations. Methods used To analyze the topic, I decided to interview four different co...

  11. Healthcare management strategies: interdisciplinary team factors.

    Science.gov (United States)

    Andreatta, Pamela; Marzano, David

    2012-12-01

    Interdisciplinary team factors are significant contributors to clinical performance and associated patient outcomes. Quality of care and patient safety initiatives identify human factors associated with team performance as a prime improvement area for clinical patient care. The majority of references to interdisciplinary teams in obstetrics and gynecology in the literature recommends the use of multidisciplinary approaches when managing complex medical cases. The reviewed literature suggests that interdisciplinary team development is important for achieving optimally efficient and effective performance; however, few reports provide specific recommendations for how to optimally achieve these objectives in the process of providing interdisciplinary care to patients. The absence of these recommendations presents a significant challenge for those tasked with improving team performance in the workplace. The prescribed team development programs cited in the review are principally built around communication strategies and simulation-based training mechanisms. Few reports provide descriptions of optimal team-based competencies in the various contexts of obstetric and gynecology teams. However, team-based evaluation strategies and empirical data documenting the transfer of team training to applied clinical care are increasing in number and quality. Our findings suggest that research toward determining team factors that promote optimal performance in applied clinical practice requires definition of specific competencies for the variable teams serving obstetrics and gynecology.

  12. OSART Guidelines. 2015 Edition. Reference Report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2016-01-01

    The IAEA works to provide a global nuclear safety and security framework for the protection of people and the environment from the effects of ionizing radiation, the minimization of the likelihood of accidents that could endanger life and property, and effective mitigation of the effects of any such events, should they occur. The strategic approach to achieving such a framework involves continual improvement in four areas: national and international safety infrastructures; the establishment and global acceptance of IAEA safety standards; an integrated approach to the provision for the application of the safety standards; and a global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. Conservative design, careful manufacture and sound construction are all prerequisites for the safe operation of nuclear power plants. However, the safety of the plant also depends ultimately on: sound management, policies, procedures, processes and practices; the capability and reliability of commissioning and operating personnel; comprehensive instructions; sound accident management and emergency preparedness; and adequate resources. Finally, a positive attitude and conscientiousness on the part of all staff in discharging their responsibilities is important to safety. The OSART programme is based on the safety standards applicable to nuclear power plants. IAEA safety standards reflect the consensus of Member States on nuclear safety matters. The reports of the International Nuclear Safety Group identify important current nuclear safety issues and also serve as references during an OSART review. The publication OSART Guidelines provides overall guidance on the conduct of OSART

  13. Bioadhesives for internal medical applications: A review.

    Science.gov (United States)

    Zhu, Wenzhen; Chuah, Yon Jin; Wang, Dong-An

    2018-04-22

    Bioadhesives such as tissue adhesives, hemostatic agents, and tissue sealants have gained increasing popularity in different areas of clinical operations during the last three decades. Bioadhesives can be categorized into internal and external ones according to their application conditions. External bioadhesives are generally applied in topical medications such as wound closure and epidermal grafting. Internal bioadhesives are mainly used in intracorporal conditions with direct contact to internal environment including tissues, organs and body fluids, such as chronic organ leak repair and bleeding complication reduction. This review focuses on internal bioadhesives that, in contrast with external bioadhesives, emphasize much more on biocompatibility and adhesive ability to wet surfaces rather than on gluing time and intensity. The crosslinking mechanisms of present internal bioadhesives can be generally classified as follows: 1) chemical conjugation between reactive groups; 2) free radical polymerization by light or redox initiation; 3) biological or biochemical coupling with specificity; and 4) biomimetic adhesion inspired from natural phenomena. In this review, bioadhesive products of each class are summarized and discussed by comparing their designs, features, and applications as well as their prospects for future development. Despite the emergence of numerous novel bioadhesive formulations in recent years, thus far, the classification of internal and external bioadhesives has not been well defined and universally acknowledged. Many of the formulations have been proposed for treatment of several diseases even though they are not applicable for such conditions. This is because of the lack of a systematic standard or evaluation protocol during the development of a new adhesive product. In this review, the definition of internal and external bioadhesives is given for the first time, and with a focus on internal bioadhesives, the criteria of an ideal internal

  14. Report of the technical review team on the Catalytic Extraction Process

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The TRT was impressed with the quality and volume of laboratory and pilot scale development work that had been conducted over the past year. Many of the doubts and questions raised by the TRP on technical details had been examined, either by theoretical calculations or in the pilot facility. Moreover, a more open and forthcoming attitude was evident among the MMT staff who either presented briefings or responded to the Team`s questions. Of special note to DOE, the TRP recognized a year ago that the pilot facility at Fall River was not designed for radioactive pilot tests. However, from the dialogue surrounding the TRP review, it was evident that not much thought had been given to the hazards, concerns, and special requirements incumbent with radioactive operations -- everything from doing pours of hot radioactive metal from a vessel to remote-handling equipment and operations. This year the TRT noticed a significant improvement in this respect.

  15. Mapping the rehabilitation interventions of a community stroke team to the extended International Classification of Functioning, Disability and Health Core Set for Stroke.

    Science.gov (United States)

    Evans, Melissa; Hocking, Clare; Kersten, Paula

    2017-12-01

    This study aim was to evaluate whether the Extended International Classification of Functioning, Disability and Health Core Set for Stroke captured the interventions of a community stroke rehabilitation team situated in a large city in New Zealand. It was proposed that the results would identify the contribution of each discipline, and the gaps and differences in service provision to Māori and non-Māori. Applying the Extended International Classification of Functioning, Disability and Health Core Set for Stroke in this way would also inform whether this core set should be adopted in New Zealand. Interventions were retrospectively extracted from 18 medical records and linked to the International Classification of Functioning, Disability and Health and the Extended International Classification of Functioning, Disability and Health Core Set for Stroke. The frequencies of linked interventions and the health discipline providing the intervention were calculated. Analysis revealed that 98.8% of interventions provided by the rehabilitation team could be linked to the Extended International Classification of Functioning, Disability and Health Core Set for Stroke, with more interventions for body function and structure than for activities and participation; no interventions for emotional concerns; and limited interventions for community, social and civic life. Results support previous recommendations for additions to the EICSS. The results support the use of the Extended International Classification of Functioning, Disability and Health Core Set for Stroke in New Zealand and demonstrates its use as a quality assurance tool that can evaluate the scope and practice of a rehabilitation service. Implications for Rehabilitation The Extended International Classification of Functioning Disability and Health Core Set for Stroke appears to represent the stroke interventions of a community stroke rehabilitation team in New Zealand. As a result, researchers and clinicians may have

  16. Sleep and Recovery in Team Sport: Current Sleep-Related Issues Facing Professional Team-Sport Athletes.

    Science.gov (United States)

    Fullagar, Hugh H K; Duffield, Rob; Skorski, Sabrina; Coutts, Aaron J; Julian, Ross; Meyer, Tim

    2015-11-01

    While the effects of sleep loss on performance have previously been reviewed, the effects of disturbed sleep on recovery after exercise are less reported. Specifically, the interaction between sleep and physiological and psychological recovery in team-sport athletes is not well understood. Accordingly, the aim of the current review was to examine the current evidence on the potential role sleep may play in postexercise recovery, with a tailored focus on professional team-sport athletes. Recent studies show that team-sport athletes are at high risk of poor sleep during and after competition. Although limited published data are available, these athletes also appear particularly susceptible to reductions in both sleep quality and sleep duration after night competition and periods of heavy training. However, studies examining the relationship between sleep and recovery in such situations are lacking. Indeed, further observational sleep studies in team-sport athletes are required to confirm these concerns. Naps, sleep extension, and sleep-hygiene practices appear advantageous to performance; however, future proof-of-concept studies are now required to determine the efficacy of these interventions on postexercise recovery. Moreover, more research is required to understand how sleep interacts with numerous recovery responses in team-sport environments. This is pertinent given the regularity with which these teams encounter challenging scenarios during the course of a season. Therefore, this review examines the factors that compromise sleep during a season and after competition and discusses strategies that may help improve sleep in team-sport athletes.

  17. Conceptualizing Interprofessional Teams as Multi-Team Systems-Implications for Assessment and Training.

    Science.gov (United States)

    West, Courtney; Landry, Karen; Graham, Anna; Graham, Lori; Cianciolo, Anna T; Kalet, Adina; Rosen, Michael; Sherman, Deborah Witt

    2015-01-01

    , Communication, Teamwork, and Self-Evaluation, was completed by 188 students including 99 from Nursing, 43 from Medicine, 6 from Pharmacy, and 40 participants who belonged to more than one component, were students at another institution, or did not indicate their institution. The team instrument was designed to assess each team member's perception of how well the team and him- or herself met the competencies. Five of the items on the team perceptions questionnaire mirrored items on the standardized patient evaluation: demonstrated leadership practices that led to effective teamwork, discussed care and decisions about that care with patient, described roles and responsibilities clearly, worked well together to coordinate care, and good/effective communication. Internal consistency reliability of the IPE Team Observation Instrument was 0.80. In 18 of the 20 items, more than 50% of observers indicated the item was demonstrated. Of those, 6 of the items were observed by 50% to 75% of the observers, and the remaining 12 were observed by more than 80% of the observers. Internal consistency reliability of the IPE Team's Perception of Collaborative Care Instrument was 0.95. The mean response score-1 (strongly disagree) to 4 (strongly agree)-was calculated for each section of the instrument. The overall mean score was 3.57 (SD = .11). Internal consistency reliability of the Standardized Patient IPE Team Evaluation Instrument was 0.87. The overall mean score was 3.28 (SD = .17). The ratings for the 5 items shared by the standardized patient and team perception instruments were compared using independent sample t tests. Statistically significant differences (p teamwork; however, challenges remain. Due to the large scale of the simulation exercise, observation-based assessment did not function as well as self- and standardized patient-based assessment. To promote greater variation in observer assessments during future Disaster Day simulations, we plan to adjust the rating scale from "not

  18. Sourcing teams and interdepartmental integration

    DEFF Research Database (Denmark)

    Lidegaard, Nina; Ellegaard, Chris; Møller, Morten Munkgaard

    2015-01-01

    Internal integration is often mentioned as a prerequisite for conducting strategic sourcing, as multiple functional departments must collaborate on creating value-creating activities amongst them. Though it is one of many possibilities, the use of cross-functional teams is often the most commonly...... proposed solution to ensure internal integration. This paper presents an exploratory case study evaluating the use of internal integration mechanisms in a cross-functional sourcing process. Two commodity categories are examined. One is organised in a cross-functional team, while the other is not. Findings...... indicate that informal integration mechanisms not promoted by management or the organizational structure may contribute to the overall level of integration....

  19. Impact of crisis resource management simulation-based training for interprofessional and interdisciplinary teams: A systematic review.

    Science.gov (United States)

    Fung, Lillia; Boet, Sylvain; Bould, M Dylan; Qosa, Haytham; Perrier, Laure; Tricco, Andrea; Tavares, Walter; Reeves, Scott

    2015-01-01

    Crisis resource management (CRM) abilities are important for different healthcare providers to effectively manage critical clinical events. This study aims to review the effectiveness of simulation-based CRM training for interprofessional and interdisciplinary teams compared to other instructional methods (e.g., didactics). Interprofessional teams are composed of several professions (e.g., nurse, physician, midwife) while interdisciplinary teams are composed of several disciplines from the same profession (e.g., cardiologist, anaesthesiologist, orthopaedist). Medline, EMBASE, CINAHL, Cochrane Central Register of Controlled Trials, and ERIC were searched using terms related to CRM, crisis management, crew resource management, teamwork, and simulation. Trials comparing simulation-based CRM team training versus any other methods of education were included. The educational interventions involved interprofessional or interdisciplinary healthcare teams. The initial search identified 7456 publications; 12 studies were included. Simulation-based CRM team training was associated with significant improvements in CRM skill acquisition in all but two studies when compared to didactic case-based CRM training or simulation without CRM training. Of the 12 included studies, one showed significant improvements in team behaviours in the workplace, while two studies demonstrated sustained reductions in adverse patient outcomes after a single simulation-based CRM team intervention. In conclusion, CRM simulation-based training for interprofessional and interdisciplinary teams show promise in teaching CRM in the simulator when compared to didactic case-based CRM education or simulation without CRM teaching. More research, however, is required to demonstrate transfer of learning to workplaces and potential impact on patient outcomes.

  20. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. The Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team's Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team

  1. Standards of resuscitation during inter-hospital transportation: the effects of structured team briefing or guideline review - A randomised, controlled simulation study of two micro-interventions

    Directory of Open Access Journals (Sweden)

    Christensen Erika F

    2011-03-01

    Full Text Available Abstract Background Junior physicians are sometimes sent in ambulances with critically ill patients who require urgent transfer to another hospital. Unfamiliar surroundings and personnel, time pressure, and lack of experience may imply a risk of insufficient treatment during transportation as this can cause the physician to loose the expected overview of the situation. While health care professionals are expected to follow complex algorithms when resuscitating, stress can compromise both solo-performance and teamwork. Aim To examine whether inter-hospital resuscitation improved with a structured team briefing between physician and ambulance crew in preparation for transfer vs. review of resuscitation guidelines. The effect parameters were physician team leadership (requesting help, delegating tasks, time to resuscitation key elements (chest compressions, defibrillation, ventilations, medication, or a combination of these termed "the first meaningful action", and hands-off ratio. Methods Participants: 46 physicians graduated within 5 years. Design: A simulation intervention study with a control group and two interventions (structured team briefing or review of guidelines. Scenario: Cardiac arrest during simulated inter-hospital transfer. Results Forty-six candidates participated: 16 (control, 13 (review, and 17 (team briefing. Reviewing guidelines delayed requesting help to 162 seconds, compared to 21 seconds in control and team briefing groups (p = 0.021. Help was not requested in 15% of cases; never requesting help was associated with an increased hands-off ratio, from 39% if the driver's assistance was requested to 54% if not (p Conclusion Neither review nor team briefing improved the time to resuscitation key elements. Review led to an eight-fold increase in the delay to requesting help. The association between never requesting help and an increased hands-off ratio underpins the importance of prioritising available resources. Other medical

  2. Effects of Plyometric Training on Physical Fitness in Team Sport Athletes: A Systematic Review

    Directory of Open Access Journals (Sweden)

    Slimani Maamer

    2016-12-01

    Full Text Available Plyometric training (PT is a very popular form of physical conditioning of healthy individuals that has been extensively studied over the last decades. In this article, we critically review the available literature related to PT and its effects on physical fitness in team sport athletes. We also considered studies that combined PT with other popular training modalities (e.g. strength/sprint training. Generally, short-term PT (i.e. 2-3 sessions a week for 4-16 weeks improves jump height, sprint and agility performances in team sport players. Literature shows that short PT (<8 weeks has the potential to enhance a wide range of athletic performance (i.e. jumping, sprinting and agility in children and young adult amateur players. Nevertheless, 6 to 7 weeks training appears to be too short to improve physical performance in elite male players. Available evidence suggests that short-term PT on non-rigid surfaces (i.e. aquatic, grass or sand-based PT could elicit similar increases in jumping, sprinting and agility performances as traditional PT. Furthermore, the combination of various plyometric exercises and the bilateral and unilateral jumps could improve these performances more than the use of single plyometric drills or traditional PT. Thus, the present review shows a greater effect of PT alone on jump and sprint (30 m sprint performance only performances than the combination of PT with sprint/strength training. Although many issues related to PT remain to be resolved, the results presented in this review allow recommending the use of well-designed and sport-specific PT as a safe and effective training modality for improving jumping and sprint performance as well as agility in team sport athletes.

  3. Team knowledge research: emerging trends and critical needs.

    Science.gov (United States)

    Wildman, Jessica L; Thayer, Amanda L; Pavlas, Davin; Salas, Eduardo; Stewart, John E; Howse, William R

    2012-02-01

    This article provides a systematic review of the team knowledge literature and guidance for further research. Recent research has called attention to the need for the improved study and understanding of team knowledge. Team knowledge refers to the higher level knowledge structures that emerge from the interactions of individual team members. We conducted a systematic review of the team knowledge literature, focusing on empirical work that involves the measurement of team knowledge constructs. For each study, we extracted author degree area, study design type, study setting, participant type, task type, construct type, elicitation method, aggregation method, measurement timeline, and criterion domain. Our analyses demonstrate that many of the methodological characteristics of team knowledge research can be linked back to the academic training of the primary author and that there are considerable gaps in our knowledge with regard to the relationships between team knowledge constructs, the mediating mechanisms between team knowledge and performance, and relationships with criteria outside of team performance, among others. We also identify categories of team knowledge not yet examined based on an organizing framework derived from a synthesis of the literature. There are clear opportunities for expansion in the study of team knowledge; the science of team knowledge would benefit from a more holistic theoretical approach. Human factors researchers are increasingly involved in the study of teams. This review and the resulting organizing framework provide researchers with a summary of team knowledge research over the past 10 years and directions for improving further research.

  4. How best to structure interdisciplinary primary care teams: the study protocol for a systematic review with narrative framework synthesis.

    Science.gov (United States)

    Wranik, W Dominika; Hayden, Jill A; Price, Sheri; Parker, Robin M N; Haydt, Susan M; Edwards, Jeanette M; Suter, Esther; Katz, Alan; Gambold, Liesl L; Levy, Adrian R

    2016-10-04

    Western publicly funded health care systems increasingly rely on interdisciplinary teams to support primary care delivery and management of chronic conditions. This knowledge synthesis focuses on what is known in the academic and grey literature about optimal structural characteristics of teams. Its goal is to assess which factors contribute to the effective functioning of interdisciplinary primary care teams and improved health system outcomes, with specific focus on (i) team structure contribution to team process, (ii) team process contribution to primary care goals, and (iii) team structure contribution to primary care goals. The systematic search of academic literature focuses on four chronic conditions and co-morbidities. Within this scope, qualitative and quantitative studies that assess the effects of team characteristics (funding, governance, organization) on care process and patient outcomes will be searched. Electronic databases (Ovid MEDLINE, Embase, CINAHL, PAIS, Web of Science) will be searched systematically. Online web-based searches will be supported by the Grey Matters Tool. Studies will be included, if they report on interdisciplinary primary care in publicly funded Western health systems, and address the relationships between team structure, process, and/or patient outcomes. Studies will be selected in a three-stage screening process (title/abstract/full text) by two independent reviewers in each stage. Study quality will be assessed using the Mixed Methods Assessment Tool. An a priori framework will be applied to data extraction, and a narrative framework approach is used for the synthesis. Using an integrated knowledge translation approach, an electronic decision support tool will be developed for decision makers. It will be searchable along two axes of inquiry: (i) what primary care goals are supported by specific team characteristics and (ii) how should teams be structured to support specific primary care goals? The results of this evidence

  5. The effects of team reflexivity on psychological well-being in manufacturing teams.

    Science.gov (United States)

    Chen, Jingqiu; Bamberger, Peter A; Song, Yifan; Vashdi, Dana R

    2018-04-01

    While the impact of team reflexivity (a.k.a. after-event-reviews, team debriefs) on team performance has been widely examined, we know little about its implications on other team outcomes such as member well-being. Drawing from prior team reflexivity research, we propose that reflexivity-related team processes reduce demands, and enhance control and support. Given the centrality of these factors to work-based strain, we posit that team reflexivity, by affecting these factors, may have beneficial implications on 3 core dimensions of employee burnout, namely exhaustion, cynicism, and inefficacy (reduced personal accomplishment). Using a sample of 469 unskilled manufacturing workers employed in 73 production teams in a Southern Chinese factory, we implemented a time lagged, quasi-field experiment, with half of the teams trained in and executing an end-of-shift team debriefing, and the other half assigned to a control condition and undergoing periodic postshift team-building exercises. Our findings largely supported our hypotheses, demonstrating that relative to team members assigned to the control condition, those assigned to the reflexivity condition experienced a significant improvement in all 3 burnout dimensions over time. These effects were mediated by control and support (but not demands) and amplified as a function of team longevity. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  6. How the Entrepreneurial Top Management Team Setup Influences Firm Performance and the Ability to Raise Capital: A Literature Review

    OpenAIRE

    Konstantin Maschke; Dodo zu Knyphausen-Aufseß

    2012-01-01

    This paper reviews research findings on entrepreneurial top management teams within the last 20 years. It concentrates on team-based management factors and their influence on a new venture’s growth and ability to raise capital. This paper integrates recent findings and provides an overview of the current state of research. Moreover, it contributes to the overall topic by proposing five clusters of major team-specific influences, derives determinants of success and failure, and reveals recomme...

  7. Knowledge sharing in international product development teams

    DEFF Research Database (Denmark)

    Sonne, Anne-Mette; Harmsen, Hanne

    Many companies are facing an increasing need to compete on a global scale. But as companies move into multiple markets, the process of developing new products becomes increasingly complex. Coping successfully with the increased internationalization forces companies to excel at collaboration...... company are far from trivial and the problems associated with transfer will increase with geographical and cultural difference (Bresman et al., 1999). Especially tacit knowledge is difficult to transport across national boarders (Kogut & Zander, 1992) and not much research exists on how companies overcome...... development process is by using teams. Teams are considered one of the best tools for exchanging especially tacit knowledge, since this kind of knowledge is transferred best through personal interaction and face-to-face meetings (Madhavan & Grover, 1998; Nonaka, 1994). In accordance with this, more and more...

  8. Systematic review of international evidence on the effectiveness and costs of paediatric home care for children and young people who are ill.

    Science.gov (United States)

    Parker, G; Spiers, G; Gridley, K; Atkin, K; Birks, Y; Lowson, K; Light, K

    2013-01-01

    Promoting 'care closer to home' for ill children is a policy and practice objective internationally. Progress towards this goal is hampered by a perceived lack of evidence on effectiveness and costs. The aim of the work reported here was to establish the strength of current international evidence on the effectiveness and costs of paediatric home care by updating and extending an earlier systematic review. A systematic review following Centre for Reviews and Dissemination guidelines involved updating electronic searches, and extending them to cover paediatric home care for short-term acute conditions. Twenty-one databases were searched from 1990 to April 2007. Hand searching was also carried out. Pairs of team members, guided by an algorithm, selected randomized controlled trials (RCTs), other comparative studies and studies including health economics data. A third reviewer resolved any disagreements. The quality of RCTs was assessed, but a 'best-evidence' approach was taken overall. Data were extracted into specifically designed spreadsheets and a second team member checked all data. Narrative synthesis was used throughout. This paper reports findings from RCTs and studies with health economics data. In total, 16 570 publications were identified after de-duplication. Eleven new RCTs (reported in 17 papers) and 20 papers with health economics data were included and reviewed. Evidence on costs and effectiveness of paediatric home care has not grown substantially since the previous review, but this updated review adds weight to the conclusion that it can deliver equivalent clinical outcomes for children and not impose a greater burden on families. Indeed, in some cases, there is evidence of reduced burden and costs for families compared with hospital care. There is also growing evidence, albeit based on weaker evidence, that paediatric home care may reduce costs for health services, particularly for children with complex and long-term needs. © 2012 Blackwell

  9. Gender diversity in teams

    OpenAIRE

    Ghazala Azmat

    2014-01-01

    Women’s representation on corporate boards, political committees, and other teams is increasing, in part because of legal mandates. Data on team dynamics and gender differences in preferences (risk-taking behavior, taste for competition, prosocial behavior) show how gender composition influences group decision-making and subsequent performance through channels such as investment decisions, internal management, corporate governance, and social responsibility.

  10. A Cross-Disciplinary Literature Review: Examining Trust on Virtual Teams

    Science.gov (United States)

    Berry, Gregory R.

    2011-01-01

    Effective and efficient teams communicate, collaborate, and perform, even if these teams are not co-located. Although much is known about enabling effectiveness on face-to-face teams, considerably less is known about similarly enabling effectiveness on virtual teams. Yet the use of virtual teams is common and will likely become more commonplace as…

  11. How the Entrepreneurial Top Management Team Setup Influences Firm Performance and the Ability to Raise Capital: A Literature Review

    Directory of Open Access Journals (Sweden)

    Konstantin Maschke

    2012-05-01

    Full Text Available This paper reviews research findings on entrepreneurial top management teams within the last 20 years. It concentrates on team-based management factors and their influence on a new venture’s growth and ability to raise capital. This paper integrates recent findings and provides an overview of the current state of research. Moreover, it contributes to the overall topic by proposing five clusters of major team-specific influences, derives determinants of success and failure, and reveals recommendations for further research.

  12. When Is a Sprint a Sprint? A Review of the Analysis of Team-Sport Athlete Activity Profile

    Directory of Open Access Journals (Sweden)

    Alice J. Sweeting

    2017-06-01

    Full Text Available The external load of a team-sport athlete can be measured by tracking technologies, including global positioning systems (GPS, local positioning systems (LPS, and vision-based systems. These technologies allow for the calculation of displacement, velocity and acceleration during a match or training session. The accurate quantification of these variables is critical so that meaningful changes in team-sport athlete external load can be detected. High-velocity running, including sprinting, may be important for specific team-sport match activities, including evading an opponent or creating a shot on goal. Maximal accelerations are energetically demanding and frequently occur from a low velocity during team-sport matches. Despite extensive research, conjecture exists regarding the thresholds by which to classify the high velocity and acceleration activity of a team-sport athlete. There is currently no consensus on the definition of a sprint or acceleration effort, even within a single sport. The aim of this narrative review was to examine the varying velocity and acceleration thresholds reported in athlete activity profiling. The purposes of this review were therefore to (1 identify the various thresholds used to classify high-velocity or -intensity running plus accelerations; (2 examine the impact of individualized thresholds on reported team-sport activity profile; (3 evaluate the use of thresholds for court-based team-sports and; (4 discuss potential areas for future research. The presentation of velocity thresholds as a single value, with equivocal qualitative descriptors, is confusing when data lies between two thresholds. In Australian football, sprint efforts have been defined as activity >4.00 or >4.17 m·s−1. Acceleration thresholds differ across the literature, with >1.11, 2.78, 3.00, and 4.00 m·s−2 utilized across a number of sports. It is difficult to compare literature on field-based sports due to inconsistencies in velocity and

  13. Prof. Samuel ting presents results from AMS experiment at CERN main auditorium. Geneva 3 April 2013. The international team running the Alpha Magnetic Spectrometer (AMS1) today announced the first results in its search for dark matter

    CERN Multimedia

    Samuel Morier-Genoud

    2013-01-01

    Geneva 3 April 2013. The international team running the Alpha Magnetic Spectrometer (AMS) today announced the first results in its search for dark matter. The results, presented by AMS spokesperson Professor Samuel Ting in a seminar at CERN, are to be published in the journal Physical Review Letters. They report the observation of an excess of positrons in the cosmic ray flux

  14. Multidisciplinary team care in rehabilitation

    DEFF Research Database (Denmark)

    Momsen, A.-M.; Nielsen, C.V.; Rasmussen, J.O.

    2012-01-01

    Objectives: To systematically investigate current scientific evidence about the effectiveness of multidisciplinary team rehabilitation for different health problems. Data sources: A comprehensive literature search was conducted in Cochrane, Medline, DARE, Embase, and Cinahl databases, and research...... for adults, without restrictions in terms of study population or outcomes. The most recent reviews examining a study population were selected. Data extraction: Two reviewers independently extracted information about study populations, sample sizes, study designs, rehabilitation settings, the team...

  15. IAEA Fact-Finding Team Completes Visit to Japan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: A team of international nuclear safety experts today completed a preliminary assessment of the safety issues linked with TEPCO's Fukushima Daiichi Nuclear Power Station accident following the Great East Japan Earthquake and Tsunami. The team - created by an agreement of the International Atomic Energy Agency (IAEA) and the Government of Japan - sought to identify lessons learned from the accident that can help improve nuclear safety around the world. To conduct its work, the team held extensive discussions with officials from the full range of Japanese nuclear-related agencies and visited three nuclear sites, including the nuclear power plant at TEPCO's Fukushima Daiichi. These visits gave the team a first-hand appreciation of the scale of devastation wreaked by the earthquake and tsunami on 11 March and of the extraordinary efforts Japanese workers have been applying ever since to stabilize the situation. ''Our entire team was humbled by the enormous damage inflicted by the tsunami on Japan. We are also profoundly impressed by the dedication of Japanese workers working to resolve this unprecedented nuclear accident,'' said team leader Mike Weightman, the United Kingdom's Chief Inspector of Nuclear Installations. The team was comprised of international experts with experience across a range of nuclear specialties. They came from 12 countries: Argentina, China, France, Hungary, India, Indonesia, Russia, South Korea, Spain, Turkey, United Kingdom and the United States. In a draft report summary delivered to Japanese authorities today, the team prepared a set of preliminary conclusions and identified lessons learned in three broad areas: external hazards, severe accident management and emergency preparedness. The final report will be delivered to the Ministerial Conference on Nuclear Safety at IAEA headquarters in Vienna from 20 to 24 June. The expert team made several preliminary findings and lessons learned, including: Japan's response to the nuclear

  16. 8 CFR 287.10 - Expedited internal review process.

    Science.gov (United States)

    2010-01-01

    ... jurisdiction regarding criminal violations of law. [68 FR 35281, June 13, 2003] ... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Expedited internal review process. 287.10... OFFICERS; POWERS AND DUTIES § 287.10 Expedited internal review process. (a) Violations of standards for...

  17. Virtual team collaboration

    DEFF Research Database (Denmark)

    Bjørn, Pernille; Ngwenyama, Ojelanki

    2009-01-01

    Managing international teams with geographically distributed participants is a complex task. The risk of communication breakdowns increases due to cultural and organizational differences grounded in the geographical distribution of the participants. Such breakdowns indicate general misunderstandi...

  18. PPB | Study Team

    Science.gov (United States)

    The Pleuropulmonary Blastoma (PPB) DICER1 Syndrome Study team is made up of researchers from the National Cancer Institute, Children¹s National Medical Center, the International Pleuropulmonary Blastoma Registry, and Washington University in St. Louis.

  19. The long-term radiological safety of a surface disposal facility for low-level waste in Belgium - An international Peer review of key aspects of ONDRAF/NIRAS' safety report of November 2011 in preparation for the license

    International Nuclear Information System (INIS)

    2012-01-01

    An important activity of the OECD Nuclear Energy Agency (NEA) in the field of radioactive waste management is the organisation of independent, international peer reviews of national studies and projects. This report provides an international peer review of the long-term safety strategy and assessment being developed by the Belgian Agency for Radioactive Waste and Enriched Fissile Materials, ONDRAF/NIRAS, as part of the licence application for the construction and operation of a surface disposal facility for short-lived, low- and intermediate-level radioactive waste in the municipality of Dessel, Belgium. The review was carried out by an International Review Team comprised of seven international specialists, all of whom were free of conflict of interest and chosen to bring complementary expertise to the review. To be accessible to both specialist and non-specialist readers, the review findings are provided at several levels of detail

  20. Talent development in adolescent team sports: a review.

    Science.gov (United States)

    Burgess, Darren J; Naughton, Geraldine A

    2010-03-01

    Traditional talent development pathways for adolescents in team sports follow talent identification procedures based on subjective games ratings and isolated athletic assessment. Most talent development models are exclusive rather than inclusive in nature. Subsequently, talent identification may result in discontentment, premature stratification, or dropout from team sports. Understanding the multidimensional differences among the requirements of adolescent and elite adult athletes could provide more realistic goals for potential talented players. Coach education should include adolescent development, and rewards for team success at the adolescent level should reflect the needs of long-term player development. Effective talent development needs to incorporate physical and psychological maturity, the relative age effect, objective measures of game sense, and athletic prowess. The influences of media and culture on the individual, and the competing time demands between various competitions for player training time should be monitored and mediated where appropriate. Despite the complexity, talent development is a worthy investment in professional team sport.

  1. ASCOT guidelines revised 1996 edition. Guidelines for organizational self-assessment of safety culture and for reviews by the assessment of safety culture in organizations team

    International Nuclear Information System (INIS)

    1996-01-01

    In order to properly assess safety culture, it is necessary to consider the contribution of all organizations which have an impact on it. Therefore, while assessing the safety culture in an operating organization it is necessary to address at least its interfaces with the local regulatory agency, utility corporate headquarters and supporting organizations. These guidelines are primarily intended for use by any organization wishing to conduct a self-assessment of safety culture. They should also serve as a basis for conducting an international peer review of the organization's self-assessment carried out by an ASCOT (Assessment of Safety Culture in Organizations Team) mission

  2. Why didn’t you say something? Using after-event reviews to affect voice behavior and hierarchy beliefs in multi-professional action teams

    OpenAIRE

    Weiss Mona; Kolbe Michaela; Grote Gudela; Spahn Donat R.; Grande Bastian

    2016-01-01

    Team decision making can go wrong when individuals fear to voice suggestions or concerns to higher status team members. We investigate how after event reviews (AERs) can be used to promote voice behaviour and hierarchy attenuating beliefs in multi professional action teams. We hypothesized that (1) lower status team members will speak up more following an assertiveness specific AER (ASAER) as compared to a teamwork generic AER (TGAER) and (2) that an ASAER leads to stronger endorsement of hie...

  3. Managing multicultural teams.

    Science.gov (United States)

    Brett, Jeanne; Behfar, Kristin; Kern, Mary C

    2006-11-01

    Multicultural teams offer a number of advantages to international firms, including deep knowledge of different product markets, culturally sensitive customer service, and 24-hour work rotations. But those advantages may be outweighed by problems stemming from cultural differences, which can seriously impair the effectiveness of a team or even bring itto a stalemate. How can managers best cope with culture-based challenges? The authors conducted in-depth interviews with managers and members of multicultural teams from all over the world. Drawing on their extensive research on dispute resolution and teamwork and those interviews, they identify four problem categories that can create barriers to a team's success: direct versus indirect communication, trouble with accents and fluency, differing attitudes toward hierarchy and authority, and conflicting norms for decision making. If a manager--or a team member--can pinpoint the root cause of the problem, he or she is likelier to select an appropriate strategy for solving it. The most successful teams and managers, the authors found, dealt with multicultural challenges in one of four ways: adaptation (acknowledging cultural gaps openly and working around them), structural intervention (changing the shape or makeup of the team), managerial intervention (setting norms early or bringing in a higher-level manager), and exit (removing a team member when other options have failed). Which strategy is best depends on the particular circumstances--and each has potential complications. In general, though, managers who intervene early and set norms; teams and managers who try to engage everyone on the team; and teams that can see challenges as stemming from culture, not personality, succeed in solving culture-based problems with good humor and creativity. They are the likeliest to harvest the benefits inherent in multicultural teams.

  4. Getting research published internationally in English: An ethnographic account of a team of Finance Spanish scholars’ struggles

    Directory of Open Access Journals (Sweden)

    Pilar Mur Dueñas

    2012-10-01

    Full Text Available Intercultural text-based research has shown remarkable differences in the rhetorical structure and devices of research articles (RAs in different linguistic/cultural contexts of publication, including the Spanish local context and the English international context. However, not much attention has been paid to the research article (RA writing process, which can throw light into the publication practices of second language (L2 scholars in particular disciplinary fields and which can help unveil their main writing difficulties. In this paper I focus on the “text histories” of a team of Spanish researchers in the field of Finance who struggle to get their research articles published internationally in English. These text histories correspond to 24 papers drafted and (resubmitted over the past 5-6 years. The analysis focuses on the extent to which they aim to publish their RAs in English, how they cope with writing their texts in English, their success in such a task and the kind of negative comments included in the referee reports they receive. Results show that this team of L2 scholars almost exclusively write their RAs in English and aim at publishing them in English-medium international journals; for this demanding task, they draw on a number of strategies. They are partially successful in that they have managed to publish half of their RAs in the first site where they were submitted. Their manuscripts received a lot of negative comments; especially relevant is the inclusion of a high number of unspecific negative comments related to language or style in major revision reports. Looking into the writing process can be of great help to provide L2 scholars with useful guidelines on drafting their RAs in English for international publication and to gain an insight into the forces driving international publication in this context.

  5. Understanding the Consequences of Newcomer Integration Processes: The Sport Team Socialization Tactics Questionnaire.

    Science.gov (United States)

    Benson, Alex J; Eys, Mark

    2017-02-01

    The ways in which newcomers are integrated into sport teams may have broad consequences for the athletes entering the group, as well as for the existing team members. Drawing from organizational socialization theory, the current research developed a questionnaire to assess athletes' perceptions of how newcomers are socialized into their group. Across four studies, think-aloud interviews (N = 8), an expert panel review (N = 6), cross-sectional tests of the factor structure (N Study 2  = 197; N Study 3  = 460), and a two-wave correlational design (N Study 4  = 194) were used to evaluate the construct validity and the internal consistency of the Sport Team Socialization Tactics Questionnaire (STSTQ). Collectively, these efforts identified a three-factor structure underlying the STSTQ and provided preliminary evidence for its validity. The STSTQ enables researchers to systematically examine the individual- and group-level consequences associated with the socialization tactics implemented in sport teams.

  6. Review Team Focused Modeling Analysis of Radial Collector Well Operation on the Hypersaline Groundwater Plume beneath the Turkey Point Site near Homestead, Florida

    International Nuclear Information System (INIS)

    Oostrom, Martinus; Vail, Lance W.

    2016-01-01

    Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company's application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units-Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction and operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.

  7. Applying established guidelines to team-based learning programs in medical schools: a systematic review.

    Science.gov (United States)

    Burgess, Annette W; McGregor, Deborah M; Mellis, Craig M

    2014-04-01

    Team-based learning (TBL), a structured form of small-group learning, has gained popularity in medical education in recent years. A growing number of medical schools have adopted TBL in a variety of combinations and permutations across a diversity of settings, learners, and content areas. The authors conducted this systematic review to establish the extent, design, and practice of TBL programs within medical schools to inform curriculum planners and education designers. The authors searched the MEDLINE, PubMed, Web of Knowledge, and ERIC databases for articles on TBL in undergraduate medical education published between 2002 and 2012. They selected and reviewed articles that included original research on TBL programs and assessed the articles according to the seven core TBL design elements (team formation, readiness assurance, immediate feedback, sequencing of in-class problem solving, the four S's [significant problem, same problem, specific choice, and simultaneous reporting], incentive structure, and peer review) described in established guidelines. The authors identified 20 articles that satisfied the inclusion criteria. They found significant variability across the articles in terms of the application of the seven core design elements and the depth with which they were described. The majority of the articles, however, reported that TBL provided a positive learning experience for students. In the future, faculty should adhere to a standardized TBL framework to better understand the impact and relative merits of each feature of their program.

  8. The Benefits of Team Teaching.

    Science.gov (United States)

    Morganti, Deena J.; Buckalew, Flora C.

    1991-01-01

    Discussion of team teaching focuses on librarians team teaching a course on information search strategy at the Pennsylvania State Berks Campus Library. Course requirements are described, planning for the course is discussed, grading practices are reviewed, and course and instructor evaluations are described. (two references) (LRW)

  9. External Peer Review Team Report for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nye County, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Marutzky, Sam J. [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States); Andrews, Robert [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2015-01-01

    The peer review team commends the Navarro-Intera, LLC (N-I), team for its efforts in using limited data to model the fate of radionuclides in groundwater at Yucca Flat. Recognizing the key uncertainties and related recommendations discussed in Section 6.0 of this report, the peer review team has concluded that U.S. Department of Energy (DOE) is ready for a transition to model evaluation studies in the corrective action decision document (CADD)/corrective action plan (CAP) stage. The DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) clarified the charge to the peer review team in a letter dated October 9, 2014, from Bill R. Wilborn, NNSA/NFO Underground Test Area (UGTA) Activity Lead, to Sam J. Marutzky, N-I UGTA Project Manager: “The model and supporting information should be sufficiently complete that the key uncertainties can be adequately identified such that they can be addressed by appropriate model evaluation studies. The model evaluation studies may include data collection and model refinements conducted during the CADD/CAP stage. One major input to identifying ‘key uncertainties’ is the detailed peer review provided by independent qualified peers.” The key uncertainties that the peer review team recognized and potential concerns associated with each are outlined in Section 6.0, along with recommendations corresponding to each uncertainty. The uncertainties, concerns, and recommendations are summarized in Table ES-1. The number associated with each concern refers to the section in this report where the concern is discussed in detail.

  10. A systematic review examining the effectiveness of blending technology with team-based learning.

    Science.gov (United States)

    River, Jo; Currie, Jane; Crawford, Tonia; Betihavas, Vasiliki; Randall, Sue

    2016-10-01

    Technological advancements are rapidly changing nursing education in higher education settings. Nursing academics are enthusiastically blending technology with active learning approaches such as Team Based Learning (TBL). While the educational outcomes of TBL are well documented, the value of blending technology with TBL (blended-TBL) remains unclear. This paper presents a systematic review examining the effectiveness of blended-TBL in higher education health disciplines. This paper aimed to identify how technology has been incorporated into TBL in higher education health disciplines. It also sought to evaluate the educational outcomes of blended-TBL in terms of student learning and preference. A review of TBL research in Medline, CINAHL, ERIC and Embase databases was undertaken including the search terms, team based learning, nursing, health science, medical, pharmaceutical, allied health education and allied health education. Papers were appraised using the Critical Appraisal Skills Program (CASP). The final review included 9 papers involving 2094 student participants. A variety of technologies were blended with TBL including interactive eLearning and social media. There is limited evidence that blended-TBL improved student learning outcomes or student preference. Enthusiasm to blend technology with TBL may not be as well founded as initially thought. However, few studies explicitly examined the value of incorporating technology into TBL. There is a clear need for research that can discern the impact of technology into TBL on student preference and learning outcomes, with a particular focus on barriers to student participation with online learning components. Copyright © 2016 Elsevier Ltd. All rights reserved.

  11. COMMUNICATING SUCCESSFULLY WHEN MANAGING MULTICULTURAL TEAMS

    Directory of Open Access Journals (Sweden)

    Alexandra IOANID

    2014-11-01

    Full Text Available Day by day globalization covers new areas of life and calls for continuous learning and adjusting to new cultural dimensions. Managers are expected to display adaptation to new ways of working, cultural sensitivity, cultural intelligence and to posses multicultural competencies communication skills. Understanding the impact of cultural diversity on the communication within the organization is essential for the success of a company. Especially in multinational companies, when departments working on the same projects are located in different countries, the managers rely more and more on cultural- specific country characteristics in order to chose the best negotiation and communication techniques. The aim of this paper is to show how the country specific cultural characteristics impact on the success or failure of a business and the organizations’ challenge with preparing managers for success in international business environment. The paper is based on literature review and on authors’ experience in managing multicultural project teams, in international environment.

  12. Assessing Team Leadership in Emergency Medicine: The Milestones and Beyond.

    Science.gov (United States)

    Rosenman, Elizabeth D; Branzetti, Jeremy B; Fernandez, Rosemarie

    2016-07-01

    Team leadership is a critical skill for emergency medicine physicians that directly affects team performance and the quality of patient care. There exists a robust body of team science research supporting team leadership conceptual models and behavioral skill sets. However, to date, this work has not been widely incorporated into health care team leadership education. This narrative review has 3 aims: (1) to synthesize the team science literature and to translate important concepts and models to health care team leadership; (2) to describe how team leadership is currently represented in the health care literature and in the Accreditation Council for Graduate Medical Education Milestones for emergency medicine; and (3) to propose a novel, evidence-based framework for the assessment of team leadership in emergency medicine. We conducted a narrative review of the team science and health care literature. We summarized our findings and identified a list of team leadership behaviors that were then used to create a framework for team leadership assessment. Current health care team leadership measurement tools do not incorporate evidence-based models of leadership concepts from other established domains. The emergency medicine milestones include several team leadership behaviors as part of a larger resident evaluation program. However, they do not offer a comprehensive or cohesive representation of the team leadership construct. Despite the importance of team leadership to patient care, there is no standardized approach to team leadership assessment in emergency medicine. Based on the results of our review, we propose a novel team leadership assessment framework that is supported by the team science literature.

  13. Immersion research education: students as catalysts in international collaboration research.

    Science.gov (United States)

    Anderson, K H; Friedemann, M L; Bűscher, A; Sansoni, J; Hodnicki, D

    2012-12-01

    This paper describes an international nursing and health research immersion program. Minority students from the USA work with an international faculty mentor in teams conducting collaborative research. The Minority Health International Research Training (MHIRT) program students become catalysts in the conduct of cross-cultural research. To narrow the healthcare gap for disadvantaged families in the USA and partner countries. Faculty from the USA, Germany, Italy, Colombia, England, Austria and Thailand formed an international research and education team to explore and compare family health issues, disparities in chronic illness care, social inequities and healthcare solutions. USA students in the MHIRT program complete two introductory courses followed by a 3-month research practicum in a partner country guided by faculty mentors abroad. The overall program development, student study abroad preparation, research project activities, cultural learning, and student and faculty team outcomes are explored. Cross-fertilization of research, cultural awareness and ideas about improving family health occur through education, international exchange and research immersion. Faculty research and international team collaboration provide opportunities for learning about research, health disparities, cultural influences and healthcare systems. The students are catalysts in the research effort, the dissemination of research findings and other educational endeavours. Five steps of the collaborative activities lead to programmatic success. MHIRT scholars bring creativity, enthusiasm, and gain a genuine desire to conduct health research about families with chronic illness. Their cultural learning stimulates career plans that include international research and attention to vulnerable populations. © 2012 The Authors. International Nursing Review © 2012 International Council of Nurses.

  14. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Pohan, Vivi Gusrini Rahmadani; Ancok, Djamaludin

    2010-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  15. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Vivi Gusrini Rahmadani Pohan; Djamaludin Ancok

    2015-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  16. Use of Team-Based Learning Pedagogy for Internal Medicine Ambulatory Resident Teaching.

    Science.gov (United States)

    Balwan, Sandy; Fornari, Alice; DiMarzio, Paola; Verbsky, Jennifer; Pekmezaris, Renee; Stein, Joanna; Chaudhry, Saima

    2015-12-01

    Team-based learning (TBL) is used in undergraduate medical education to facilitate higher-order content learning, promote learner engagement and collaboration, and foster positive learner attitudes. There is a paucity of data on the use of TBL in graduate medical education. Our aim was to assess resident engagement, learning, and faculty/resident satisfaction with TBL in internal medicine residency ambulatory education. Survey and nominal group technique methodologies were used to assess learner engagement and faculty/resident satisfaction. We assessed medical learning using individual (IRAT) and group (GRAT) readiness assurance tests. Residents (N = 111) involved in TBL sessions reported contributing to group discussions and actively discussing the subject material with other residents. Faculty echoed similar responses, and residents and faculty reported a preference for future teaching sessions to be offered using the TBL pedagogy. The average GRAT score was significantly higher than the average IRAT score by 22%. Feedback from our nominal group technique rank ordered the following TBL strengths by both residents and faculty: (1) interactive format, (2) content of sessions, and (3) competitive nature of sessions. We successfully implemented TBL pedagogy in the internal medicine ambulatory residency curriculum, with learning focused on the care of patients in the ambulatory setting. TBL resulted in active resident engagement, facilitated group learning, and increased satisfaction by residents and faculty. To our knowledge this is the first study that implemented a TBL program in an internal medicine residency curriculum.

  17. Forming Student Online Teams for Maximum Performance

    Science.gov (United States)

    Olson, Joel D.; Ringhand, Darlene G.; Kalinski, Ray C.; Ziegler, James G.

    2015-01-01

    What is the best way to assign graduate business students to online team-based projects? Team assignments are frequently made on the basis of alphabet, time zones or previous performance. This study reviews personality as an indicator of student online team performance. The personality assessment IDE (Insights Discovery Evaluator) was administered…

  18. Review Team Focused Modeling Analysis of Radial Collector Well Operation on the Hypersaline Groundwater Plume beneath the Turkey Point Site near Homestead, Florida

    Energy Technology Data Exchange (ETDEWEB)

    Oostrom, Martinus [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Vail, Lance W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-08-01

    Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company’s application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units—Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction and operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.

  19. A review of salient elements defining team collaboration in paediatric rehabilitation

    NARCIS (Netherlands)

    Nijhuis, B. J. G.; Reinders-Messelink, H. A.; de Blecourt, A. C. E.; Olijve, W. G.; Groothoff, J. W.; Nakken, H.; Postema, K.; Postuma, K.

    Objective: To explicate the complex process of team collaboration and identify salient elements of team collaboration in paediatric rehabilitation. Data sources: After an initial search to define key features of team collaboration a systematic search on team collaboration and the key features was

  20. Assessing Team Leadership in Emergency Medicine: The Milestones and Beyond

    Science.gov (United States)

    Rosenman, Elizabeth D.; Branzetti, Jeremy B.; Fernandez, Rosemarie

    2016-01-01

    Background Team leadership is a critical skill for emergency medicine physicians that directly affects team performance and the quality of patient care. There exists a robust body of team science research supporting team leadership conceptual models and behavioral skill sets. However, to date, this work has not been widely incorporated into health care team leadership education. Objective This narrative review has 3 aims: (1) to synthesize the team science literature and to translate important concepts and models to health care team leadership; (2) to describe how team leadership is currently represented in the health care literature and in the Accreditation Council for Graduate Medical Education Milestones for emergency medicine; and (3) to propose a novel, evidence-based framework for the assessment of team leadership in emergency medicine. Methods We conducted a narrative review of the team science and health care literature. We summarized our findings and identified a list of team leadership behaviors that were then used to create a framework for team leadership assessment. Results Current health care team leadership measurement tools do not incorporate evidence-based models of leadership concepts from other established domains. The emergency medicine milestones include several team leadership behaviors as part of a larger resident evaluation program. However, they do not offer a comprehensive or cohesive representation of the team leadership construct. Conclusions Despite the importance of team leadership to patient care, there is no standardized approach to team leadership assessment in emergency medicine. Based on the results of our review, we propose a novel team leadership assessment framework that is supported by the team science literature. PMID:27413434

  1. A Constrained and Versioned Data Model for TEAM Data

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.

    2009-04-01

    , sampling unit and time range. The operation insertSamplingUnit(sampling unit, site, protocol) saves a new sampling unit into the data model and links it with the site and protocol. The operation updateSampligUnit(sampling_unit_id, attribute, value) changes the attribute (e.g. latitude or longitude) of the sampling unit to the specified value. The operation insertData(observation record, site, protocol, sampling unit, timestamps, data collectors) saves a new observation record into the database and associates it with specified objects. The operation updateData(protocol, data_id, attribute, value) modifies the attribute of an existing observation record to the specified value. All the insert or update operations require: 1) authorization to ensure the user has necessary privileges to perform the operation; 2) timestamp validation to ensure the observation timestamps are in the designated time range specified in the sampling schedule; 3) data validation to check that the data records use correct taxonomy terms and data values. No authorization is performed for get operations, but under some specific condition, a username may be required for the purpose of authentication. Along with the validations above, the TEAM data model also supports human based data validation on observed data through the Data Review subsystem to ensure data quality. The data review is implemented by adding two attributes review_tag and review_comment to each observation data record. The attribute review_tag is used by a reviewer to specify the quality of data, and the attribute review_comment is for reviewers to give more information when a problem is identified. The review_tag attribute can be populated by either the system conducting QA/QC tests or by pre-specified scientific experts. The following is the review operation, which is actually a special case of the operation updateData: The operation updateReview(protocol, data_id, judgment, comment) sets the attribute review_tag and review_comment to

  2. Rapid Response Teams: Is it Time to Reframe the Questions of Rapid Response Team Measurement?

    Science.gov (United States)

    Salvatierra, Gail G; Bindler, Ruth C; Daratha, Kenn B

    2016-11-01

    The purpose of this article is to present an overview of rapid response team (RRT) history in the United States, provide a review of prior RRT effectiveness research, and propose the reframing of four new questions of RRT measurement that are designed to better understand RRTs in the context of contemporary nursing practice as well as patient outcomes. RRTs were adopted in the United States because of their intuitive appeal, and despite a lack of evidence for their effectiveness. Subsequent studies used mortality and cardiac arrest rates to measure whether or not RRTs "work." Few studies have thoroughly examined the effect of RRTs on nurses and on nursing practice. An extensive literature review provided the background. Suppositions and four critical, unanswered questions arising from the literature are suggested. The results of RRT effectiveness, which have focused on patient-oriented outcomes, have been ambiguous, contradictory, and difficult to interpret. Additionally, they have not taken into account the multiple ways in which these teams have impacted nurses and nursing practice as well as patient outcomes. What happens in terms of RRT process and utilization is likely to have a major impact on nurses and nursing care on general medical and surgical wards. What that impact will be depends on what we can learn from measuring with an expanded yardstick, in order to answer the question, "Do RRTs work?" Evidence for the benefits of RRTs depends on proper framing of questions relating to their effectiveness, including the multiple ways RRTs contribute to nursing efficacy. © 2016 Sigma Theta Tau International.

  3. Team building: conceptual, methodological, and applied considerations.

    Science.gov (United States)

    Beauchamp, Mark R; McEwan, Desmond; Waldhauser, Katrina J

    2017-08-01

    Team building has been identified as an important method of improving the psychological climate in which teams operate, as well as overall team functioning. Within the context of sports, team building interventions have consistently been found to result in improvements in team effectiveness. In this paper we review the extant literature on team building in sport, and address a range of conceptual, methodological, and applied considerations that have the potential to advance theory, research, and applied intervention initiatives within the field. This involves expanding the scope of team building strategies that have, to date, primarily focused on developing group cohesion. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. A Review and Annotated Bibliography of the Literature Pertaining to Team and Small Group Performance (1989 to 1999)

    National Research Council Canada - National Science Library

    LaJoie, Andrew

    1999-01-01

    .... Training and military doctrine has been evolving to reflect this emphasis on teamwork. The purpose of this annotated bibliography is to review literature published over the last ten years concerning team and small group performance...

  5. Development and validation of an instrument for measuring the quality of teamwork in teaching teams in postgraduate medical training (TeamQ).

    Science.gov (United States)

    Slootweg, Irene A; Lombarts, Kiki M J M H; Boerebach, Benjamin C M; Heineman, Maas Jan; Scherpbier, Albert J J A; van der Vleuten, Cees P M

    2014-01-01

    Teamwork between clinical teachers is a challenge in postgraduate medical training. Although there are several instruments available for measuring teamwork in health care, none of them are appropriate for teaching teams. The aim of this study is to develop an instrument (TeamQ) for measuring teamwork, to investigate its psychometric properties and to explore how clinical teachers assess their teamwork. To select the items to be included in the TeamQ questionnaire, we conducted a content validation in 2011, using a Delphi procedure in which 40 experts were invited. Next, for pilot testing the preliminary tool, 1446 clinical teachers from 116 teaching teams were requested to complete the TeamQ questionnaire. For data analyses we used statistical strategies: principal component analysis, internal consistency reliability coefficient, and the number of evaluations needed to obtain reliable estimates. Lastly, the median TeamQ scores were calculated for teams to explore the levels of teamwork. In total, 31 experts participated in the Delphi study. In total, 114 teams participated in the TeamQ pilot. The median team response was 7 evaluations per team. The principal component analysis revealed 11 factors; 8 were included. The reliability coefficients of the TeamQ scales ranged from 0.75 to 0.93. The generalizability analysis revealed that 5 to 7 evaluations were needed to obtain internal reliability coefficients of 0.70. In terms of teamwork, the clinical teachers scored residents' empowerment as the highest TeamQ scale and feedback culture as the area that would most benefit from improvement. This study provides initial evidence of the validity of an instrument for measuring teamwork in teaching teams. The high response rates and the low number of evaluations needed for reliably measuring teamwork indicate that TeamQ is feasible for use by teaching teams. Future research could explore the effectiveness of feedback on teamwork in follow up measurements.

  6. Developing Skills in Counselling and Psychotherapy: A Scoping Review of Interpersonal Process Recall and Reflecting Team Methods in Initial Therapist Training

    Science.gov (United States)

    Meekums, Bonnie; Macaskie, Jane; Kapur, Tricia

    2016-01-01

    The authors conducted a scoping review of the peer-reviewed literature associated with Interpersonal Process Recall (IPR) and Reflecting Team (RT) methods in order to find evidence for their use within skills development in therapist trainings. Inclusion criteria were: empirical research, reviews of empirical research, and responses to these; RT…

  7. Integrated Transdisciplinary Teams.

    Science.gov (United States)

    Gallivan-Fenlon, Amanda

    1994-01-01

    This article reviews the use of transdisciplinary teaming and integrated therapy for young children with multiple disabilities. It presents examples and suggestions for implementation, in the areas of flexibility, Individualized Education Program development, and parent participation. (JDD)

  8. Dietary supplements and team-sport performance.

    Science.gov (United States)

    Bishop, David

    2010-12-01

    A well designed diet is the foundation upon which optimal training and performance can be developed. However, as long as competitive sports have existed, athletes have attempted to improve their performance by ingesting a variety of substances. This practice has given rise to a multi-billion-dollar industry that aggressively markets its products as performance enhancing, often without objective, scientific evidence to support such claims. While a number of excellent reviews have evaluated the performance-enhancing effects of most dietary supplements, less attention has been paid to the performance-enhancing claims of dietary supplements in the context of team-sport performance. Dietary supplements that enhance some types of athletic performance may not necessarily enhance team-sport performance (and vice versa). Thus, the first aim of this review is to critically evaluate the ergogenic value of the most common dietary supplements used by team-sport athletes. The term dietary supplements will be used in this review and is defined as any product taken by the mouth, in addition to common foods, that has been proposed to have a performance-enhancing effect; this review will only discuss substances that are not currently banned by the World Anti-Doping Agency. Evidence is emerging to support the performance-enhancing claims of some, but not all, dietary supplements that have been proposed to improve team-sport-related performance. For example, there is good evidence that caffeine can improve single-sprint performance, while caffeine, creatine and sodium bicarbonate ingestion have all been demonstrated to improve multiple-sprint performance. The evidence is not so strong for the performance-enhancing benefits of β-alanine or colostrum. Current evidence does not support the ingestion of ribose, branched-chain amino acids or β-hydroxy-β-methylbutyrate, especially in well trained athletes. More research on the performance-enhancing effects of the dietary supplements

  9. IAEA Completes Nuclear Security Review Mission in Indonesia

    International Nuclear Information System (INIS)

    2014-01-01

    A team of International Atomic Energy Agency (IAEA) experts today completed a two-week mission to review nuclear security practices in Indonesia. At the request of the Indonesian Government, the IAEA conducted an International Physical Protection Advisory Service (IPPAS) mission that reviewed the current status of the State's Physical Protection Regime of nuclear and other radioactive material, as well as associated facilities and activities in Indonesia. This included the country's nuclear security-related legislative and regulatory framework and the physical protection systems at the nuclear research sites in Serpong, Bandung and Yogyakarta, as well as radioactive facilities at Bekasi and Cibitung. The mission also reviewed how the recommendations of previous IPPAS missions in 2001 and 2007 had been implemented. The IPPAS team concluded that, since the last missions, Indonesia has improved its national security regime, especially its legislation and regulations, and had introduced new physical protection equipment. It also found that areas remained that required attention and efforts were needed to reach an overall comprehensive and effective nuclear security regime. The team made a number of new recommendations and suggestions aimed at further strengthening the overall regime

  10. The impact of the multidisciplinary team in the management of individuals with diabetic foot ulcers: a systematic review.

    Science.gov (United States)

    Buggy, A; Moore, Z

    2017-06-02

    To assess the impact of the multidisciplinary team in the management of the diabetic foot compared with those who did not receive multidisciplinary care. A systematic review of the literature was conducted using the following databases: Cumulative Index to Nursing and Allied Health Literature (CINAHL), Medline, Embase and Cochrane Library. The following search terms were used: diabetic foot, multidisciplinary team, patient care team, multidisciplinary care team. Data were extracted using a bespoke data extraction tool and quality appraisal of the studies was undertaken using the EBL Critical Appraisal checklist. Data analysis was undertaken using RevMan with results presented as odds ratio for dichotomous data, or mean difference for continuous data, all with the associated 95% confidence intervals. The search identified 19 eligible studies. Severity of amputation, death rates and length of hospital stay of clients receiving multidisciplinary team care were improved when compared with those who did not receive multidisciplinary team care. Ulcer healing and quality of life showed an improvement but not all studies explored these outcomes. Only 7 of the 19 articles appraised were found to be of acceptable quality, questioning the generalisability of the results. From the currently available evidence a positive impact of the multidisciplinary team on diabetic foot outcomes can be seen, but due to the lack of high-quality evidence and substantial heterogeneity in the studies, these results should be interpreted with caution.

  11. International student mobility literature review

    NARCIS (Netherlands)

    King, R.; Findlay, A.; Ahrens, J.

    2010-01-01

    To bring their understanding of patterns in students' study and work abroad up to date, HEFCE and the British Council, the UK National Agency for Erasmus, commissioned a review of international student mobility. Professor Russell King and Jill Ahrens of the University of Sussex, and Professor Allan

  12. Managing and mitigating conflict in healthcare teams: an integrative review.

    Science.gov (United States)

    Almost, Joan; Wolff, Angela C; Stewart-Pyne, Althea; McCormick, Loretta G; Strachan, Diane; D'Souza, Christine

    2016-07-01

    To review empirical studies examining antecedents (sources, causes, predictors) in the management and mitigation of interpersonal conflict. Providing quality care requires positive, collaborative working relationships among healthcare team members. In today's increasingly stress-laden work environments, such relationships can be threatened by interpersonal conflict. Identifying the underlying causes of conflict and choice of conflict management style will help practitioners, leaders and managers build an organizational culture that fosters collegiality and create the best possible environment to engage in effective conflict management. Integrative literature review. CINAHL, MEDLINE, PsycINFO, Proquest ABI/Inform, Cochrane Library and Joanne Briggs Institute Library were searched for empirical studies published between 2002-May 2014. The review was informed by the approach of Whittemore and Knafl. Findings were extracted, critically examined and grouped into themes. Forty-four papers met the inclusion criteria. Several antecedents influence conflict and choice of conflict management style including individual characteristics, contextual factors and interpersonal conditions. Sources most frequently identified include lack of emotional intelligence, certain personality traits, poor work environment, role ambiguity, lack of support and poor communication. Very few published interventions were found. By synthesizing the knowledge and identifying antecedents, this review offers evidence to support recommendations on managing and mitigating conflict. As inevitable as conflict is, it is the responsibility of everyone to increase their own awareness, accountability and active participation in understanding conflict and minimizing it. Future research should investigate the testing of interventions to minimize these antecedents and, subsequently, reduce conflict. © 2016 John Wiley & Sons Ltd.

  13. SPQR Team Description Paper

    OpenAIRE

    Cherubini , Andrea; Leonetti , M; Marchetti , L; De Luca , A; Iocchi , L; Nardi , D; Oriolo , G; Vendittelli , M

    2008-01-01

    International audience; SPQR is the group of the Faculty of Engineering at Sapienza University of Rome in Italy, that is involved in RoboCup competitions since 1998 in different leagues (Middle-size 1998-2002, Four-legged since 2000, Real-rescue-robots 2003-2006, Virtual-rescue since 2006 and @Home in 2006). In RoboCup 2008, SPQR team will participate in the Standard Platform League with Nao humanoid robots and in the Virtual Rescue League.The team for 2008 is composed by two groups from the C...

  14. Multidisciplinary safety team (MDST) factors of success.

    Science.gov (United States)

    2014-11-01

    This project included a literature review and summary that focused on subjects related to team building, team/committee member : motivational strategies, and tools for effective and efficient committee meetings. It also completed an online survey of ...

  15. Uterine transplantation: Review in human research.

    Science.gov (United States)

    Favre-Inhofer, A; Rafii, A; Carbonnel, M; Revaux, A; Ayoubi, J M

    2018-06-01

    Uterine transplantation is the solution to treat absolute uterine fertility. In this review, we present the historical, medical, technical, psychological and ethical perspectives in human uterine transplantation research. We reviewed the PubMed database following PRISMA guidelines and added data presented by several research teams during the first international congress on uterine transplantation. Copyright © 2018. Published by Elsevier Masson SAS.

  16. KHNP special safety review

    International Nuclear Information System (INIS)

    Lee, Tae-Ho; Lee, Bang-Jin; Lee, Soung-Hee; Park, Goon-Cherl

    2009-01-01

    Commemorating the 30 year anniversary of commercial nuclear power plant operation in KOREA, Korea Hydro and Nuclear Power Co., Ltd. (KHNP) has conducted a Special Safety Review (SSR) of its 20 operating units to understand their safety performance and to identify any areas that need improvement. The SSR reviewed all 20 operating units for 2 weeks per site. Areas that were reviewed are Safety Margins, Plant Performance, Employee Safety, Employee Performance and Performance Improvement Process. Each review team consisted of international and domestic members. The international reviewers were from IAEA, WANO and INPO. The domestic reviewers consisted of professors, Engineering Company, Research Institute and KHNP experts. The review confirmed safe and reliable operations of the 20 nuclear units. The common understanding resulted from the SSR is as follows. Firstly, KHNP corporate and its plants confirmed and shared mutual understanding on recurring areas for improvements, especially in the areas of Organizational Effectiveness, Industrial Safety, Human Performance, Configuration Management, Operations, Equipment Performance and Material Condition. Secondly, KHNP understood that plant and department level performances are directly related to the leadership and competency of the management team including supervisors. Thirdly, the strengths of individual stations that consistently have produced good results need to be shared with the other KHNP stations. Finally, KHNP learned that strong corporate leadership and support are needed to resolve most of the areas for improvement since they are common to all KHNP stations. (author)

  17. Addressing dysfunctional relations among healthcare teams: improving team cooperation through applied organizational theories.

    Science.gov (United States)

    Horwitz, Sujin K; Horwitz, Irwin B; Barshes, Neal R

    2011-01-01

    Previous research has demonstrated that communication failure and interpersonal conflicts are significant impediments among health-care teams to assess complex information and engage in the meaningful collaboration necessary for optimizing patient care. Despite the prolific research on the role of effective teamwork in accomplishing complex tasks, such findings have been traditionally applied to business organizations and not medical contexts. This chapter, therefore, reviews and applies four theories from the fields of organizational behavior (OB) and organization development (OD) as potential means for improving team interaction in health-care contexts. This study is unique in its approach as it addresses the long-standing problems that exist in team communication and cooperation in health-care teams by applying well-established theories from the organizational literature. The utilization and application of the theoretical constructs discussed in this work offer valuable means by which the efficacy of team work can be greatly improved in health-care organizations.

  18. Moving Forward with Computational Red Teaming

    Science.gov (United States)

    2012-07-01

    Red Teaming is used across both public and private sectors and is not the sole domain of the military. Red Team Consulting (2011) notes that “the use...open for review. Consider also the context of application. Oh (2009) explains how globalisation , the rise of emerging powers, environmental

  19. Systematic Review of International Colposcopy Quality Improvement Guidelines.

    Science.gov (United States)

    Mayeaux, Edward J; Novetsky, Akiva P; Chelmow, David; Choma, Kim; Garcia, Francisco; Liu, Angela H; Papasozomenos, Theognosia; Einstein, Mark H

    2017-10-01

    The American Society for Colposcopy and Cervical Pathology Colposcopy Standards Committee organized multiple working groups to draft colposcopy standards for the United States. As part of this project, international quality assurance and improvement measures were examined. The quality improvement working group performed a systematic review of the literature to collate international guidelines related to quality improvement. Source guidelines were collected using searches in Medline, Google Scholar, the International Federation of Cervical Pathology and Colposcopy Web site, other regional colposcopy group's Web sites, and communications with International Federation of Cervical Pathology and Colposcopy board of directors' members and other expert members of various national groups. Once identified, the sources were reviewed by multiple workgroup members for potential guideline materials. Fifty-six unique documents were identified, of which 18 met inclusion criteria and contributed data to the analysis. Information was abstracted and grouped by related subject. Wide variation exists in colposcopy guidance and quality indicators from regional and national colposcopy societies. Abstracted international guidelines are presented.

  20. Web Team Development

    Science.gov (United States)

    Church, Jennifer; Felker, Kyle

    2005-01-01

    The dynamic world of the Web has provided libraries with a wealth of opportunities, including new approaches to the provision of information and varied internal staffing structures. The development of self-managed Web teams, endowed with authority and resources, can create an adaptable and responsive culture within libraries. This new working team…

  1. IAEA Mission Concludes Peer Review of Slovenia's Nuclear Regulatory Framework

    International Nuclear Information System (INIS)

    2014-01-01

    Senior international nuclear safety and radiation protection experts today concluded an eight-day International Atomic Energy Agency (IAEA) mission to review the regulatory framework for nuclear and radiation safety at the Slovenian Nuclear Safety Administration (SNSA). The team reviewed measures taken to address the recommendations and suggestions made during an earlier Integrated Regulatory Review Service (IRRS) mission conducted in 2011. The IRRS team said in its preliminary findings that Slovenia had made significant progress since the review in 2011. The team identified a good practice in the country's nuclear regulatory system additional to those identified in 2011 and made new recommendations and suggestions to SNSA and the Government to strengthen the effectiveness of the country's regulatory framework in line with IAEA Safety Standards. ''By hosting a follow-up mission, Slovenia demonstrated its commitment to enhance its regulatory programmes, including by implementing the recommendations of the 2011 mission,'' said Petr Krs, mission leader and Vice Chairman of the Czech Republic's State Office for Nuclear Safety. SNSA's Director, Andrej Stritar, welcomed the progress noted by the team, while also emphasizing that the mission highlighted important future nuclear safety challenges for Slovenia. The five-member review team, comprising experts from Belgium, the Czech Republic, France and Romania, as well as four IAEA staff members, conducted the mission at the request of the Slovenian Government from 9 to 16 September 2014. The main observations of the IRRS Review team included the following: SNSA has made significant progress in addressing the findings of the 2011 IRRS mission and has demonstrated commitment to effective implementation of the IRRS programme; The economic situation in Slovenia might in the short and long term affect SNSA's ability to maintain its capacity and competence; and A radioactive waste disposal project is stalled and the licensing

  2. Capacity for conducting systematic reviews in low- and middle-income countries: a rapid appraisal.

    Science.gov (United States)

    Oliver, Sandy; Bangpan, Mukdarut; Stansfield, Claire; Stewart, Ruth

    2015-04-26

    Systematic reviews of research are increasingly recognised as important for informing decisions across policy sectors and for setting priorities for research. Although reviews draw on international research, the host institutions and countries can focus attention on their own priorities. The uneven capacity for conducting research around the world raises questions about the capacity for conducting systematic reviews. A rapid appraisal was conducted of current capacity and capacity strengthening activities for conducting systematic reviews in low- and middle-income countries (LMICs). A systems approach to analysis considered the capacity of individuals nested within the larger units of research teams, institutions that fund, support, and/or conduct systematic reviews, and systems that support systematic reviewing internationally. International systematic review networks, and their support organisations, are dominated by members from high-income countries. The largest network comprising a skilled workforce and established centres is the Cochrane Collaboration. Other networks, although smaller, provide support for systematic reviews addressing questions beyond effective clinical practice which require a broader range of methods. Capacity constraints were apparent at the levels of individuals, review teams, organisations, and system wide. Constraints at each level limited the capacity at levels nested within them. Skills training for individuals had limited utility if not allied to opportunities for review teams to practice the skills. Skills development was further constrained by language barriers, lack of support from academic organisations, and the limitations of wider systems for communication and knowledge management. All networks hosted some activities for strengthening the capacities of individuals and teams, although these were usually independent of core academic programmes and traditional career progression. Even rarer were efforts to increase demand for

  3. A cluster-randomized controlled study to evaluate a team coaching concept for improving teamwork and patient-centeredness in rehabilitation teams.

    Directory of Open Access Journals (Sweden)

    Mirjam Körner

    Full Text Available Although the relevance of interprofessional teamwork in the delivery of patient-centered care is well known, there is a lack of interventions for improving team interaction in the context of rehabilitation in Germany. The aim of the present study is to evaluate whether a specially developed team coaching concept (TCC could improve both teamwork and patient-centeredness.A multicenter, cluster-randomized controlled intervention study was conducted with both staff and patient questionnaires. Data was collected at ten German rehabilitation clinics (five clusters of different indication fields before (t1 and after (t2 the intervention. Intervention clinics received the TCC, while control clinics did not receive any treatment. Staff questionnaires were used to measure internal participation and other aspects of teamwork, such as team organization, while patient questionnaires assessed patient-centeredness. A multivariate analysis of variance was applied for data analysis.In order to analyze the effect of TCC on internal participation and teamwork, 305 questionnaires were included for t1 and 213 for t2 in the staff survey. In the patient survey, 523 questionnaires were included for t1 and 545 for t2. The TCC improved team organization, willingness to accept responsibility and knowledge integration according to staff, with small effect sizes (univariate: η2=.010-.017, whereas other parameters including internal participation, team leadership and cohesion did not improve due to the intervention. The patient survey did not show any improvements on the assessed dimensions.The TCC improved dimensions that were addressed directly by the approach and were linked to the clinics' needs, such as restructured team meetings and better exchange of information. The TCC can be used to improve team organization, willingness to accept responsibility, and knowledge integration in rehabilitation practice, but some further evaluation is needed to understand contextual

  4. A cluster-randomized controlled study to evaluate a team coaching concept for improving teamwork and patient-centeredness in rehabilitation teams.

    Science.gov (United States)

    Körner, Mirjam; Luzay, Leonie; Plewnia, Anne; Becker, Sonja; Rundel, Manfred; Zimmermann, Linda; Müller, Christian

    2017-01-01

    Although the relevance of interprofessional teamwork in the delivery of patient-centered care is well known, there is a lack of interventions for improving team interaction in the context of rehabilitation in Germany. The aim of the present study is to evaluate whether a specially developed team coaching concept (TCC) could improve both teamwork and patient-centeredness. A multicenter, cluster-randomized controlled intervention study was conducted with both staff and patient questionnaires. Data was collected at ten German rehabilitation clinics (five clusters) of different indication fields before (t1) and after (t2) the intervention. Intervention clinics received the TCC, while control clinics did not receive any treatment. Staff questionnaires were used to measure internal participation and other aspects of teamwork, such as team organization, while patient questionnaires assessed patient-centeredness. A multivariate analysis of variance was applied for data analysis. In order to analyze the effect of TCC on internal participation and teamwork, 305 questionnaires were included for t1 and 213 for t2 in the staff survey. In the patient survey, 523 questionnaires were included for t1 and 545 for t2. The TCC improved team organization, willingness to accept responsibility and knowledge integration according to staff, with small effect sizes (univariate: η2=.010-.017), whereas other parameters including internal participation, team leadership and cohesion did not improve due to the intervention. The patient survey did not show any improvements on the assessed dimensions. The TCC improved dimensions that were addressed directly by the approach and were linked to the clinics' needs, such as restructured team meetings and better exchange of information. The TCC can be used to improve team organization, willingness to accept responsibility, and knowledge integration in rehabilitation practice, but some further evaluation is needed to understand contextual factors and

  5. Using the Everest Team Simulation to Teach Threshold Concepts

    Science.gov (United States)

    Nichols, Elizabeth; Wright, April L.

    2015-01-01

    This resource review focuses on "Leadership and Team Simulation: Everest V2" released by Harvard Business Publishing. The review describes the simulation's story line of a commercial team expedition climbing to the summit of Mount Everest along with the simulation's architecture and key features. Building on Wright and Gilmore's (2012)…

  6. An International Peer Review of the Programme for the Deep Geological Disposal of High Level Radioactive Waste from Pyro-Processing in the Republic of Korea. Report of an IAEA International Review Team

    International Nuclear Information System (INIS)

    2013-09-01

    The development of a radioactive waste disposal system is indispensable in maintaining the sustainability of nuclear energy. The Korea Atomic Energy Research Institute (KAERI) has studied the direct geological disposal of spent nuclear fuel since 1997. KAERI has also focused on the development of processes suitable for reducing the volume of spent nuclear fuel and the recycling of valuable fissile material. One of the most promising technologies investigated by KAERI is the pyro-processing of spent nuclear fuel followed by the geological disposal of the generated high level waste (HLW). Since 2007, KAERI has been running a research programme focusing on the recycling of spent nuclear fuel, as well as studies aimed at the development of a relevant geological disposal system able to accept the resulting HLW. The core aims of the KAERI study were to characterize the geological media, design a repository system and assess the overall safety of the disposal system. The development of pyro-processing technology is ongoing and has not yet been demonstrated at the commercial level. Thus, the government of the Republic of Korea requested an assessment of the technical feasibility of this technology. The assessment also included the appraisal of a disposal solution for waste generated by pyro-processing. With regard to the latter, KAERI requested that the IAEA review the status of the disposal project within the Waste Management Assessment and Technical Review Programme (WATRP). Peer reviews are increasingly being acknowledged as an important element in building broader stakeholder confidence in the safety and viability of related facilities. This report presents the consensus view of the international group of experts convened by the IAEA to perform the review

  7. The Project Team: Features, Effectiveness and Leadership

    Directory of Open Access Journals (Sweden)

    Ramona-Elena GABREA

    2017-06-01

    Full Text Available The project team that is responsible for providing flexibility and innovation to this structure in order to enable organizations to remain successful (1. The very nature of the project team's work underpins a collective task much more complex than that assumed by other types of work teams. The aim of this paper is to explore the main factors that determine the project team effectiveness. The research methodology was the literature review. The main finding reveals that the organizational structure of projects and the project team should not be considered as a panacea for all problems of organizational effectiveness.

  8. Standards of resuscitation during inter-hospital transportation: the effects of structured team briefing or guideline review - a randomised, controlled simulation study of two micro-interventions.

    Science.gov (United States)

    Høyer, Christian B; Christensen, Erika F; Eika, Berit

    2011-03-03

    Junior physicians are sometimes sent in ambulances with critically ill patients who require urgent transfer to another hospital. Unfamiliar surroundings and personnel, time pressure, and lack of experience may imply a risk of insufficient treatment during transportation as this can cause the physician to loose the expected overview of the situation. While health care professionals are expected to follow complex algorithms when resuscitating, stress can compromise both solo-performance and teamwork. To examine whether inter-hospital resuscitation improved with a structured team briefing between physician and ambulance crew in preparation for transfer vs. review of resuscitation guidelines. The effect parameters were physician team leadership (requesting help, delegating tasks), time to resuscitation key elements (chest compressions, defibrillation, ventilations, medication, or a combination of these termed "the first meaningful action"), and hands-off ratio. 46 physicians graduated within 5 years. A simulation intervention study with a control group and two interventions (structured team briefing or review of guidelines). Scenario: Cardiac arrest during simulated inter-hospital transfer. Forty-six candidates participated: 16 (control), 13 (review), and 17 (team briefing). Reviewing guidelines delayed requesting help to 162 seconds, compared to 21 seconds in control and team briefing groups (p = 0.021). Help was not requested in 15% of cases; never requesting help was associated with an increased hands-off ratio, from 39% if the driver's assistance was requested to 54% if not (p delegating tasks and warrants the need for further studies focusing on how to avoid this cognitive impairment.

  9. Implementation of a team-based learning course: Work required and perceptions of the teaching team.

    Science.gov (United States)

    Morris, Jenny

    2016-11-01

    Team-based learning was selected as a strategy to help engage pre-registration undergraduate nursing students in a second-year evidence-informed decision making course. To detail the preparatory work required to deliver a team-based learning course; and to explore the perceptions of the teaching team of their first experience using team-based learning. Descriptive evaluation. Information was extracted from a checklist and process document developed by the course leader to document the work required prior to and during implementation. Members of the teaching team were interviewed by a research assistant at the end of the course using a structured interview schedule to explore perceptions of first time implementation. There were nine months between the time the decision was made to use team-based learning and the first day of the course. Approximately 60days were needed to reconfigure the course for team-based learning delivery, develop the knowledge and expertise of the teaching team, and develop and review the resources required for the students and the teaching team. This reduced to around 12days for the subsequent delivery. Interview data indicated that the teaching team were positive about team-based learning, felt prepared for the course delivery and did not identify any major problems during this first implementation. Implementation of team-based learning required time and effort to prepare the course materials and the teaching team. The teaching team felt well prepared, were positive about using team-based learning and did not identify any major difficulties. Crown Copyright © 2016. Published by Elsevier Ltd. All rights reserved.

  10. Welding and nondestructive examination issues at Seabrook Nuclear Station: An independent review team report

    International Nuclear Information System (INIS)

    Spessard, R.L.; Coley, J.; Crowley, W.; Walton, G.

    1990-07-01

    In response to congressional concerns about the adequacy of the welding and nondestructive examination (NDE) programs at the Seabrook Nuclear Station, NRC senior management established an independent review team (IRT) to conduct an assessment. The IRT focused on the quality of the finished hardware and associated records, as well as on the adequacy of the overall quality assurance program as applied to the fabrication and NDE programs for pipe welds. This report documents the findings of that investigation

  11. Development and Validation of an Instrument for Measuring the Quality of Teamwork in Teaching Teams in Postgraduate Medical Training (TeamQ)

    Science.gov (United States)

    Slootweg, Irene A.; Lombarts, Kiki M. J. M. H.; Boerebach, Benjamin C. M.; Heineman, Maas Jan; Scherpbier, Albert J. J. A.; van der Vleuten, Cees P. M.

    2014-01-01

    Background Teamwork between clinical teachers is a challenge in postgraduate medical training. Although there are several instruments available for measuring teamwork in health care, none of them are appropriate for teaching teams. The aim of this study is to develop an instrument (TeamQ) for measuring teamwork, to investigate its psychometric properties and to explore how clinical teachers assess their teamwork. Method To select the items to be included in the TeamQ questionnaire, we conducted a content validation in 2011, using a Delphi procedure in which 40 experts were invited. Next, for pilot testing the preliminary tool, 1446 clinical teachers from 116 teaching teams were requested to complete the TeamQ questionnaire. For data analyses we used statistical strategies: principal component analysis, internal consistency reliability coefficient, and the number of evaluations needed to obtain reliable estimates. Lastly, the median TeamQ scores were calculated for teams to explore the levels of teamwork. Results In total, 31 experts participated in the Delphi study. In total, 114 teams participated in the TeamQ pilot. The median team response was 7 evaluations per team. The principal component analysis revealed 11 factors; 8 were included. The reliability coefficients of the TeamQ scales ranged from 0.75 to 0.93. The generalizability analysis revealed that 5 to 7 evaluations were needed to obtain internal reliability coefficients of 0.70. In terms of teamwork, the clinical teachers scored residents' empowerment as the highest TeamQ scale and feedback culture as the area that would most benefit from improvement. Conclusions This study provides initial evidence of the validity of an instrument for measuring teamwork in teaching teams. The high response rates and the low number of evaluations needed for reliably measuring teamwork indicate that TeamQ is feasible for use by teaching teams. Future research could explore the effectiveness of feedback on teamwork in

  12. Creating Teams Increases Extension Educator Productivity

    Science.gov (United States)

    Chalker-Scott, Linda; Daniels, Catherine H.; Martini, Nicole

    2016-01-01

    The Garden Team at Washington State University is a transdisciplinary group of faculty, staff, and students with expertise in applied plant and soil sciences and an interest in Extension education. The team's primary mission is to create current, relevant, and peer-reviewed materials as Extension publications for home gardeners. The average yearly…

  13. Beyond Quality Circles: Self-Managing Teams.

    Science.gov (United States)

    Sims, Henry P., Jr.; Dean, James W., Jr.

    1985-01-01

    This article reviews the quality circle concept, shows why its characteristics appeal to American executives, and examines some of its limitations. It looks at self-managing teams and discusses the reasons that adoptions have been relatively few. It then shows what organizational conditions are necessary for quality circles to evolve into teams.…

  14. Critical care clinician perceptions of factors leading to Medical Emergency Team review.

    Science.gov (United States)

    Currey, Judy; Allen, Josh; Jones, Daryl

    2018-03-01

    The introduction of rapid response systems has reduced the incidence of in-hospital cardiac arrest; however, many instances of clinical deterioration are unrecognised. Afferent limb failure is common and may be associated with unplanned intensive care admissions, heightened mortality and prolonged length of stay. Patients reviewed by a Medical Emergency Team are inherently vulnerable with a high in-hospital mortality. To explore perceptions of intensive care unit (ICU) staff who attend deteriorating acute care ward patients regarding current problems, barriers and potential solutions to recognising and responding to clinical deterioration that culminates in a Medical Emergency Team review. A descriptive exploratory design was used. Registered intensive care nurses and medical staff (N=207) were recruited during a professional conference using purposive sampling for experience in attending deteriorating patients. Written response surveys were used to address the study aim. Data were analysed using content analysis. Four major themes were identified: Governance, Teamwork, Clinical Care Delivery and End of Life Care. Participants perceived there was a lack of sufficient and senior staff with the required theoretical knowledge; and inadequate assessment and critical thinking skills for anticipating, recognising and responding to clinical deterioration. Senior doctors were perceived to inappropriately manage End of Life Care issues and displayed Teamwork behaviours rendering ward clinicians feeling fearful and intimidated. A lack of System and Clinical Governance hindered identification of clinical deterioration. To improve patient safety related to recognising and responding to clinical deterioration, suboptimal care due to professionals' knowledge, skills and behaviours need addressing, along with End of Life Care and Governance. Copyright © 2017 Australian College of Critical Care Nurses Ltd. All rights reserved.

  15. Determinants of team-sport performance: implications for altitude training by team-sport athletes

    Science.gov (United States)

    Bishop, David J; Girard, Olivier

    2013-01-01

    Team sports are increasingly popular, with millions of participants worldwide. Athletes engaged in these sports are required to repeatedly produce skilful actions and maximal or near-maximal efforts (eg, accelerations, changes in pace and direction, sprints, jumps and kicks), interspersed with brief recovery intervals (consisting of rest or low-intensity to moderate-intensity activity), over an extended period of time (1–2 h). While performance in most team sports is dominated by technical and tactical proficiencies, successful team-sport athletes must also have highly-developed, specific, physical capacities. Much effort goes into designing training programmes to improve these physical capacities, with expected benefits for team-sport performance. Recently, some team sports have introduced altitude training in the belief that it can further enhance team-sport physical performance. Until now, however, there is little published evidence showing improved team-sport performance following altitude training, despite the often considerable expense involved. In the absence of such studies, this review will identify important determinants of team-sport physical performance that may be improved by altitude training, with potential benefits for team-sport performance. These determinants can be broadly described as factors that enhance either sprint performance or the ability to recover from maximal or near-maximal efforts. There is some evidence that some of these physical capacities may be enhanced by altitude training, but further research is required to verify that these adaptations occur, that they are greater than what could be achieved by appropriate sea-level training and that they translate to improved team-sport performance. PMID:24282200

  16. Determinants of team-sport performance: implications for altitude training by team-sport athletes.

    Science.gov (United States)

    Bishop, David J; Girard, Olivier

    2013-12-01

    Team sports are increasingly popular, with millions of participants worldwide. Athletes engaged in these sports are required to repeatedly produce skilful actions and maximal or near-maximal efforts (eg, accelerations, changes in pace and direction, sprints, jumps and kicks), interspersed with brief recovery intervals (consisting of rest or low-intensity to moderate-intensity activity), over an extended period of time (1-2 h). While performance in most team sports is dominated by technical and tactical proficiencies, successful team-sport athletes must also have highly-developed, specific, physical capacities. Much effort goes into designing training programmes to improve these physical capacities, with expected benefits for team-sport performance. Recently, some team sports have introduced altitude training in the belief that it can further enhance team-sport physical performance. Until now, however, there is little published evidence showing improved team-sport performance following altitude training, despite the often considerable expense involved. In the absence of such studies, this review will identify important determinants of team-sport physical performance that may be improved by altitude training, with potential benefits for team-sport performance. These determinants can be broadly described as factors that enhance either sprint performance or the ability to recover from maximal or near-maximal efforts. There is some evidence that some of these physical capacities may be enhanced by altitude training, but further research is required to verify that these adaptations occur, that they are greater than what could be achieved by appropriate sea-level training and that they translate to improved team-sport performance.

  17. The Relationships Between Internal and External Measures of Training Load and Intensity in Team Sports: A Meta-Analysis.

    Science.gov (United States)

    McLaren, Shaun J; Macpherson, Tom W; Coutts, Aaron J; Hurst, Christopher; Spears, Iain R; Weston, Matthew

    2018-03-01

    The associations between internal and external measures of training load and intensity are important in understanding the training process and the validity of specific internal measures. We aimed to provide meta-analytic estimates of the relationships, as determined by a correlation coefficient, between internal and external measures of load and intensity during team-sport training and competition. A further aim was to examine the moderating effects of training mode on these relationships. We searched six electronic databases (Scopus, Web of Science, PubMed, MEDLINE, SPORTDiscus, CINAHL) for original research articles published up to September 2017. A Boolean search phrase was created to include search terms relevant to team-sport athletes (population; 37 keywords), internal load (dependent variable; 35 keywords), and external load (independent variable; 81 keywords). Articles were considered for meta-analysis when a correlation coefficient describing the association between at least one internal and one external measure of session load or intensity, measured in the time or frequency domain, was obtained from team-sport athletes during normal training or match-play (i.e., unstructured observational study). The final data sample included 122 estimates from 13 independent studies describing 15 unique relationships between three internal and nine external measures of load and intensity. This sample included 295 athletes and 10,418 individual session observations. Internal measures were session ratings of perceived exertion (sRPE), sRPE training load (sRPE-TL), and heart-rate-derived training impulse (TRIMP). External measures were total distance (TD), the distance covered at high and very high speeds (HSRD ≥ 13.1-15.0 km h -1 and VHSRD ≥ 16.9-19.8 km h -1 , respectively), accelerometer load (AL), and the number of sustained impacts (Impacts > 2-5 G). Distinct training modes were identified as either mixed (reference condition), skills, metabolic, or

  18. IAEA Mission Concludes Peer Review of Jordan's Nuclear Regulatory Framework

    International Nuclear Information System (INIS)

    2014-01-01

    Senior international nuclear safety and radiation protection experts today concluded an 11-day International Atomic Energy Agency (IAEA) Integrated Regulatory Review Service (IRRS) mission to review the regulatory framework for nuclear and radiation safety in Jordan. The mission team said in its preliminary findings that Jordan's nuclear regulator, the Energy and Minerals Regulatory Commission (EMRC), faces challenges because it is a relatively new body that handles a high workload while also working to recruit, train and keep competent staff. The team also noted that a recent merger provided the regulator with more of the resources it needs to perform its duty. The team made recommendations and suggestions to the regulatory body and the Government to help them strengthen the effectiveness of Jordan's regulatory framework and functions in line with IAEA Safety Standards. The main observations of the IRRS Review team comprised the following: The regulatory body, founded in 2007 and merged with other regulators in April 2014 to form EMRC, faces large challenges in terms of its regulatory workload, management system building and staff recruitment and training; The new EMRC structure and revision of the radiation and nuclear safety law represents an important opportunity to strengthen Jordan's radiation and nuclear safety infrastructure; The Government has shown commitment to radiation and nuclear safety through measures including becoming party to international conventions. It could further demonstrate its commitment by adopting a formal national policy and strategy for safety that defines the role of the Minister of Energy in relation to EMRC and protects the independence of regulatory decision-making

  19. From artefact to effect: the organising effects of artefacts on teams.

    Science.gov (United States)

    Berlin, Johan M; Carlström, Eric D

    2010-01-01

    Earlier studies have identified artefacts, but have only to a lesser degree looked at their effects. The purpose of this paper is to investigate how artefacts contribute to organisation. A trauma team at a university hospital has been observed and its members interviewed. The trauma team showed itself to be rich on artefacts since it had strong internal driving forces, high legitimacy, and tried to live up to high expectations from the outside. Its members were motivated to be in the forefront of trauma care. Through renewal, the team succeeded in maintaining demarcation. It also succeeded in systemising internal work tasks and made for itself a position in relation to the outside. The team's capacity, however, came to be limited by internal conflicts and battles for prestige. The study shows that informal logic has a strong influence on teams. Teamwork contributed to the development of organisational structure and motivation for the personnel. Earlier studies advocate the important role of artefacts in order to communicate, collaborate, negotiate or coordinate activities. The conclusion is that artefacts also have an organising and developing effect on teams in a fragmented and differentiated healthcare.

  20. Adaptive heterogeneous multi-robot teams

    Energy Technology Data Exchange (ETDEWEB)

    Parker, L.E.

    1998-11-01

    This research addresses the problem of achieving fault tolerant cooperation within small- to medium-sized teams of heterogeneous mobile robots. The author describes a novel behavior-based, fully distributed architecture, called ALLIANCE, that utilizes adaptive action selection to achieve fault tolerant cooperative control in robot missions involving loosely coupled, largely independent tasks. The robots in this architecture possess a variety of high-level functions that they can perform during a mission, and must at all times select an appropriate action based on the requirements of the mission, the activities of other robots, the current environmental conditions, and their own internal states. Since such cooperative teams often work in dynamic and unpredictable environments, the software architecture allows the team members to respond robustly and reliably to unexpected environmental changes and modifications in the robot team that may occur due to mechanical failure, the learning of new skills, or the addition or removal of robots from the team by human intervention. After presenting ALLIANCE, the author describes in detail the experimental results of an implementation of this architecture on a team of physical mobile robots performing a cooperative box pushing demonstration. These experiments illustrate the ability of ALLIANCE to achieve adaptive, fault-tolerant cooperative control amidst dynamic changes in the capabilities of the robot team.

  1. Study on team evaluation. Team process model for team evaluation

    International Nuclear Information System (INIS)

    Sasou Kunihide; Ebisu, Mitsuhiro; Hirose, Ayako

    2004-01-01

    Several studies have been done to evaluate or improve team performance in nuclear and aviation industries. Crew resource management is the typical example. In addition, team evaluation recently gathers interests in other teams of lawyers, medical staff, accountants, psychiatrics, executive, etc. However, the most evaluation methods focus on the results of team behavior that can be observed through training or actual business situations. What is expected team is not only resolving problems but also training younger members being destined to lead the next generation. Therefore, the authors set the final goal of this study establishing a series of methods to evaluate and improve teams inclusively such as decision making, motivation, staffing, etc. As the first step, this study develops team process model describing viewpoints for the evaluation. The team process is defined as some kinds of power that activate or inactivate competency of individuals that is the components of team's competency. To find the team process, the authors discussed the merits of team behavior with the experienced training instructors and shift supervisors of nuclear/thermal power plants. The discussion finds four team merits and many components to realize those team merits. Classifying those components into eight groups of team processes such as 'Orientation', 'Decision Making', 'Power and Responsibility', 'Workload Management', 'Professional Trust', 'Motivation', 'Training' and 'staffing', the authors propose Team Process Model with two to four sub processes in each team process. In the future, the authors will develop methods to evaluate some of the team processes for nuclear/thermal power plant operation teams. (author)

  2. Are real teams healthy teams?

    NARCIS (Netherlands)

    Buljac, M.; van Woerkom, M.; van Wijngaarden, P.

    2013-01-01

    This study examines the impact of real-team--as opposed to a team in name only--characteristics (i.e., team boundaries, stability of membership, and task interdependence) on team processes (i.e., team learning and emotional support) and team effectiveness in the long-term care sector. We employed a

  3. Team Learning in Teacher Teams: Team Entitativity as a Bridge between Teams-in-Theory and Teams-in-Practice

    Science.gov (United States)

    Vangrieken, Katrien; Dochy, Filip; Raes, Elisabeth

    2016-01-01

    This study aimed to investigate team learning in the context of teacher teams in higher vocational education. As teacher teams often do not meet all criteria included in theoretical team definitions, the construct "team entitativity" was introduced. Defined as the degree to which a group of individuals possesses the quality of being a…

  4. 75 Years of the International Labour Review: A Retrospective.

    Science.gov (United States)

    Thomas, Albert; And Others

    1996-01-01

    Contains 18 articles published in International Labour Review from 1921-1975 that discuss the International Labour Organisation, international labor movement and law, economics and the labor market, family security, full employment, population growth, industrial welfare, trade policy and employment growth, and income expectations and rural-urban…

  5. Teaching Engineering Students Team Work

    Science.gov (United States)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  6. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams.

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-04-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader's verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time.

  7. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-01-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader’s verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time. PMID:28490856

  8. Evaluating the effectiveness of health care teams.

    Science.gov (United States)

    Mickan, Sharon M

    2005-05-01

    While it is recognised that effective health care teams are associated with quality patient care, the literature is comparatively sparse in defining the outcomes of effective teamwork. This literature review of the range of organisational, team and individual benefits of teamwork complements an earlier article which summarised the antecedent conditions for (input) and team processes (throughput) of effective teams. This article summarises the evidence for a range of outcome measures of effective teams. Organisational benefits of teamwork include reduced hospitalisation time and costs, reduced unanticipated admissions, better accessibility for patients, and improved coordination of care. Team benefits include efficient use of health care services, enhanced communication and professional diversity. Patients report benefits of enhanced satisfaction, acceptance of treatment and improved health outcomes. Finally, team members report enhanced job satisfaction, greater role clarity and enhanced well-being. Due to the inherent complexity of teamwork, a constituency model of team evaluation is supported where key stakeholders identify and measure the intended benefits of a team.

  9. The role of attachment styles in team functioning

    OpenAIRE

    Pheiffer, Gary

    2016-01-01

    This research explored the potential influences on team functioning, from the perspective of adult attachment theory. Attachment styles are seen to reflect internal working models of self, others, and relationships, and influence individuals’ motivations, abilities, and perceptions as regards relationships. The research question explored what the role and influence of an individual’s global and team attachment style may have upon an individual’s experience of a work team. It sought to explain...

  10. A Systematic Review of Developing Team Competencies in Information Systems Education

    Science.gov (United States)

    Figl, Kathrin

    2010-01-01

    The ability to work effectively in teams has been a key competence for information systems engineers for a long time. Gradually, more attention is being paid to developing this generic competence as part of academic curricula, resulting in two questions: how to best promote team competencies and how to implement team projects successfully. These…

  11. Guidelines for the review of accident management programmes in nuclear power plants. Reference document for the IAEA safety service missions on review of accident management programmes in nuclear power plants

    International Nuclear Information System (INIS)

    2003-01-01

    Similarly as for other IAEA safety services, the objectives of accident management safety service are to assist the Member States in ensuring and enhancing the safety of NPPs. In particular, the objective is to assist at the utility and NPP (i.e. licensee) level in effective plant specific AMP preparation, development and implementation. However, assistance can also be provided to the regulatory body in its reviewing of AMPs. Objectives of the safety service can be summarized as follows: To explain to licensee personnel principles and possible approaches in effective implementation of AMP based on experience world-wide; To give opportunities to experts from the host plant to broaden their experience and knowledge in the field; To perform an objective assessment of the status in various phases of AMP implementation, compared with international experience and practices; To provide the licensee with suggestions and assistance for improvements in various stages of AMP implementation. The objective of the IAEA safety services is to offer two options to respond to individual requirements. These options include missions to review accident analysis needed for accident management and missions to review the whole AMP. Review of accident analysis for accident management (RAAAM): this review is intended to check completeness and quality of accident analysis covering BDBA and severe accidents. The review should be typically performed prior to use of accident analysis for development of AMP. It is considered that 2 experts and 1 IAEA team leader in one-week mission can perform the review. Detailed guidelines for review of analysis are provided in Section 2. Reference is also made to another IAEA Safety Report (Safety Standards Series No. NS-R-1) which is devoted to guidance for accident analysis of nuclear power plants (NPPs). Review of AMP (RAMP): this review of AMP, which is in particular appropriate prior to its implementation, is intended to check its quality, consistency

  12. Issues for the Traveling Team Physician.

    Science.gov (United States)

    Kaeding, Christopher C; Borchers, James

    2016-07-01

    This article outlines the value of having the team physician traveling with athletes to away venues for competitions or training sessions. At present, this travel presents several issues for the team physician who crosses state lines for taking care of the athletes. In this article, these issues and their possible remedies are discussed. A concern for the travelling team physician is practicing medicine while caring for the team in a state where the physician is not licensed. Another issue can be the transportation of controlled substances in the course of providing optimal care for the team athletes. These two issues are regulatory and legislative issues at both the state and federal levels. On the practical side of being a team physician, the issues of emergency action plans, supplies, and when to transport injured or ill patients are also reviewed. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  13. Different contributions of internal reviewers and external experts to labelling decisions on therapeutic indications in new drug reviews in Japan.

    Science.gov (United States)

    Yokota, M; Kusama, M; Matsuki, N; Ono, S

    2013-12-01

    External experts play an important role in shaping regulatory decisions in the new drug review process in the United States, Europe and Japan. No rigorous study has been performed addressing how and to what extent external experts, in contrast to internal reviewers in the agency, influence the regulatory decisions during new drug reviews. We examined their contributions in Japanese regulatory reviews in contrast to the internal reviewers, focusing on the labelling decision on therapeutic indications. With the data set of 219 new molecular entities (NMEs) approved in Japan from 2000 to 2009, we observed how proposed indications in labelling were modified in a stepwise manner during the review process and conducted multinomial logistic analysis to examine the possible mechanism behind. We found that interim assessment of indications by the internal reviewers was modified substantially by the influence of the external experts in about 20% of the 219 NMEs. Our analysis suggested that internal reviewers provided their opinion mainly based on strict review discipline, whereas external experts added flexibility and reality to their reviews. Our analysis revealed different evaluations between internal reviewers and external experts during regulatory discussions in new drug reviews and how the external panel contributes to changing internal decisions. This study provides a new and quantitative approach to better label setting by emphasizing the contributions of each stakeholder in new drug reviews, which would improve the efficiency, quality and transparency of new drug reviews to enhance public health. © 2013 John Wiley & Sons Ltd.

  14. Strengths and weaknesses of working with the Global Trigger Tool method for retrospective record review: focus group interviews with team members.

    Science.gov (United States)

    Schildmeijer, Kristina; Nilsson, Lena; Perk, Joep; Arestedt, Kristofer; Nilsson, Gunilla

    2013-09-24

    The aim was to describe the strengths and weaknesses, from team member perspectives, of working with the Global Trigger Tool (GTT) method of retrospective record review to identify adverse events causing patient harm. A qualitative, descriptive approach with focus group interviews using content analysis. 5 Swedish hospitals in 2011. 5 GTT teams, with 5 physicians and 11 registered nurses. 5 focus group interviews were carried out with the five teams. Interviews were taped and transcribed verbatim. 8 categories emerged relating to the strengths and weaknesses of the GTT method. The categories found were: Usefulness of the GTT, Application of the GTT, Triggers, Preventability of harm, Team composition, Team tasks, Team members' knowledge development and Documentation. Gradually, changes in the methodology were made by the teams, for example, the teams reported how the registered nurses divided up the charts into two sets, each being read respectively. The teams described the method as important and well functioning. Not only the most important, but also the most difficult, was the task of bringing the results back to the clinic. The teams found it easier to discuss findings at their own clinics. The GTT method functions well for identifying adverse events and is strengthened by its adaptability to different specialties. However, small, gradual methodological changes together with continuingly developed expertise and adaption to looking at harm from a patient's perspective may contribute to large differences in assessment over time.

  15. Challenges faced by international nurses when migrating: an integrative literature review.

    Science.gov (United States)

    Pung, L-X; Goh, Y-S

    2017-03-01

    Results from this literature review were used to identify the challenges faced by international nurses in their host countries following migration. The increasing strain of nursing shortages in the healthcare system has led to the recruitment of international nurses among many countries. However, following migration, international nurses are faced with challenges that may result in poor integration with their host countries. Using Cooper's five stages for integrative research reviews, a literature search was conducted across seven databases using a PRISMA search strategy. Additional manual searches were also conducted on the end-references of the retrieved articles. The authors then independently reviewed the selected articles using the Joanna Briggs Institute appraisal form to extract and generate the themes for the review. Twenty-four articles were selected for the review. The themes generated included: (i) difficulty orientating; (ii) a longing for what is missing; (iii) professional development and devaluing; (iv) communication barriers; (v) discrimination and marginalization; (vi) personal and professional differences; and (vii) a meaningful support system. By identifying the challenges faced by international nurses, interventions that ensure equal treatment (e.g. multifaceted transition programmes and culturally sensitive 'buddy' systems) can be implemented to help international nurses adapt to their new environments. Adequate communication can be achieved by encouraging international nurses to speak English and learn the colloquial language and non-verbal behaviours used by native nurses. With good integration international nurses may be able to reach their full career potential as professional nurses in their host countries. The adaptation process is a dynamic process that requires effort from both international and native nurses. Thus, any strategies that are developed and implemented must be multifaceted. © 2016 International Council of Nurses.

  16. Interprofessional Teamwork and Collaboration Between Community Health Workers and Healthcare Teams

    Science.gov (United States)

    Bernhardt, Jean M.; Lopez, Ruth Palan; Long-Middleton, Ellen R.; Davis, Sheila

    2015-01-01

    Objectives: Community Health Workers (CHWs) serve as a means of improving outcomes for underserved populations. However, their relationship within health care teams is not well studied. The purpose of this integrative review was to examine published research reports that demonstrated positive health outcomes as a result of CHW intervention to identify interprofessional teamwork and collaboration between CHWs and health care teams. Methods: A total of 47 studies spanning 33 years were reviewed using an integrative literature review methodology for evidence to support the following assumptions of effective interprofessional teamwork between CHWs and health care teams: (1) shared understanding of roles, norms, values, and goals of the team; (2) egalitarianism; (3) cooperation; (4) interdependence; and(5) synergy. Results: Of the 47 studies, 12 reported at least one assumption of effective interprofessional teamwork. Four studies demonstrated all 5 assumptions of interprofessional teamwork. Conclusions: Four studies identified in this integrative review serve as exemplars for effective interprofessional teamwork between CHWs and health care teams. Further study is needed to describe the nature of interprofessional teamwork and collaboration in relation to patient health outcomes. PMID:28462254

  17. Information delivery in team communication of MCR operators for an emergency task

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Kwang Sub; Park, Jin Kyun; Jung, Won Dae

    2005-01-01

    Team performance is a major measure to evaluate the ability of team when a lot of people perform a task of common purpose such as the main control room operators in the nuclear power plant. A team performance is affected the collaboration and communication among operators under dynamic situation as well as by the cognitive process of each team member. Specially, under the emergency situation, more clear and apparent communication in a team is a critical key for the appropriate response to emergency situation. As a general human factor analysis accesses the operator's behavior, it leads to a resulting action of planning, decision, problem-solving. In order to access the internal information and background information of his/her behavior, the verbal protocol analysis is applied. The impact factors on the team performance are derived from the state of the art for team performance, and it is found that the communication is a common key for all impact factors. And, in turn, the impact factors for the communication are accesses and the more detailed analysis is performed. The recorded data for the operator training for emergency situation of nuclear power plant training center are analyzed according to the verbal protocol analysis that are being generally utilized in cognitive psychology, educational psychology, and cognitive science. Two aspects, external (syntax) and internal (symantic) aspects of communication are reviewed. From the syntax analysis, it is found that the task of each step in EOP is separated according to each corresponding operator and the ordinary training is important, and the weak-points for a sentence presentation can be found team-by-team. And, from the symantic analysis for the diagnostic procedure of EOP is performed and the communication errors due to different situation awareness by operators could be found, and it lead to a diagnosis failure. The factors for different symantic cognition for a situation are analyzed and the affecting

  18. Perspectives on Asthenia in Astronauts and Cosmonauts: Review of the International Research Literature

    Science.gov (United States)

    Sandoval, Luis; Keeton, Kathryn; Shea, Camille; Otto, Christian; Patterson, Holly; Leveton, Lauren

    2012-01-01

    The Behavioral Health and Performance Element (BHP) is one of the 6 elements in the NASA Human Research Program (HRP) and is responsible for managing 4 of the identified and named risks to human health and performance from human space exploration: a) Risk of Behavioral Conditions (BMed), b) Risk of Psychiatric Disorders (BMed), c) Risk of Performance Decrements due to inadequate Cooperation, Coordination, Communication and Psychological Adaptation within a Team (Team), and d) Risk of Performance Errors due to Sleep Loss, Circadian De-synchronization, Fatigue and Work Overload (Sleep). Each risk is reviewed by a NASA HRP Standing Review Panel (SRP), and recently the Behavioral Medicine Risk of Psychiatric Disorders was reviewed. The aim of this report is to address one of the recommendations made by that panel, specifically the recommendation that the "literature on asthenia should be evaluated (possibly as a psychological or psychosomatic / psycho-physiological analogue of chronic fatigue syndrome)" (SRP p. 4), in addition to General Recommendation 4, which states that "all reviews must include non-English language materials as well as materials appearing in conferences reports, books, and other non-refereed journal outlets" (SRP p. 2).

  19. Multidisciplinary team functioning.

    Science.gov (United States)

    Kovitz, K E; Dougan, P; Riese, R; Brummitt, J R

    1984-01-01

    This paper advocates the need to move beyond interdisciplinary team composition as a minimum criterion for multidisciplinary functioning in child abuse treatment. Recent developments within the field reflect the practice of shared professional responsibility for detection, case management and treatment. Adherence to this particular model for intervention requires cooperative service planning and implementation as task related functions. Implicitly, this model also carries the potential to incorporate the supportive functioning essential to effective group process. However, explicit attention to the dynamics and process of small groups has been neglected in prescriptive accounts of multidisciplinary child abuse team organization. The present paper therefore focuses upon the maintenance and enhancement aspects of multidisciplinary group functioning. First, the development and philosophy of service for the Alberta Children's Hospital Child Abuse Program are reviewed. Second, composition of the team, it's mandate for service, and the population it serves are briefly described. Third, the conceptual framework within which the program functions is outlined. Strategies for effective group functioning are presented and the difficulties encountered with this model are highlighted. Finally, recommendations are offered for planning and implementing a multidisciplinary child abuse team and for maintaining its effective group functioning.

  20. Governing highly performing lean team behaviors : A mixed-methods longitudinal study

    NARCIS (Netherlands)

    Van Dun, Desirée H.; Wilderom, Celeste P.M.

    2015-01-01

    Work teams go through multiple performance cycles; initially highly performing teams may experience a decline in subsequent performance and vice-versa. This inductive study focuses on team-behavioral and contextual predictors of high lean team performance. Rooted in both the IMOI model and reviewing

  1. 75 FR 62366 - Notice of Public Information Collections Being Reviewed by the U.S. Agency for International...

    Science.gov (United States)

    2010-10-08

    ... on the respondents, including the use of automated collection techniques or other forms of... Division, U.S. Agency for International Development, Room 2.07-106, RRB, Washington, DC 20523, (202) 712..., Participant Training Team, United States Agency for International Development, Ronald Reagan Building, 1300...

  2. Tiger Team assessment of the Idaho National Engineering Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    McKenzie, Barbara J.; West, Stephanie G.; Jones, Olga G.; Kerr, Dorothy A.; Bieri, Rita A.; Sanderson, Nancy L.

    1991-08-01

    The purpose of the Safety and Health (S H) Subteam assessment was to determine the effectiveness of representative safety and health programs at the Idaho National Engineering Laboratory (INEL) site. Four Technical Safety Appraisal (TSA) Teams were assembled for this purpose by the US Department of Energy (DOE), Deputy Assistant Secretary for Safety and Quality Assurance, Office of Safety Appraisals (OSA). Team No. 1 reviewed EG G Idaho, Inc. (EG G Idaho) and the Department of Energy Field Office, Idaho (ID) Fire Department. Team No. 2 reviewed Argonne National Laboratory-West (ANL-W). Team No. 3 reviewed selected contractors at the INEL; specifically, Morrison Knudsen-Ferguson of Idaho Company (MK-FIC), Protection Technology of Idaho, Inc. (PTI), Radiological and Environmental Sciences Laboratory (RESL), and Rockwell-INEL. Team No. 4 provided an Occupational Safety and Health Act (OSHA)-type compliance sitewide assessment of INEL. The S H Subteam assessment was performed concurrently with assessments conducted by Environmental and Management Subteams. Performance was appraised in the following technical areas: Organization and Administration, Quality Verification, Operations, Maintenance, Training and Certification, Auxiliary Systems, Emergency Preparedness, Technical Support, Packaging and Transportation, Nuclear Criticality Safety, Security/Safety Interface, Experimental Activities, Site/Facility Safety Review, Radiological Protection, Personnel Protection, Worker Safety and Health (OSHA) Compliance, Fire Protection, Aviation Safety, Medical Services, and Firearms Safety.

  3. Tiger Team assessment of the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1991-08-01

    The purpose of the Safety and Health (S ampersand H) Subteam assessment was to determine the effectiveness of representative safety and health programs at the Idaho National Engineering Laboratory (INEL) site. Four Technical Safety Appraisal (TSA) Teams were assembled for this purpose by the US Department of Energy (DOE), Deputy Assistant Secretary for Safety and Quality Assurance, Office of Safety Appraisals (OSA). Team No. 1 reviewed EG ampersand G Idaho, Inc. (EG ampersand G Idaho) and the Department of Energy Field Office, Idaho (ID) Fire Department. Team No. 2 reviewed Argonne National Laboratory-West (ANL-W). Team No. 3 reviewed selected contractors at the INEL; specifically, Morrison Knudsen-Ferguson of Idaho Company (MK-FIC), Protection Technology of Idaho, Inc. (PTI), Radiological and Environmental Sciences Laboratory (RESL), and Rockwell-INEL. Team No. 4 provided an Occupational Safety and Health Act (OSHA)-type compliance sitewide assessment of INEL. The S ampersand H Subteam assessment was performed concurrently with assessments conducted by Environmental and Management Subteams. Performance was appraised in the following technical areas: Organization and Administration, Quality Verification, Operations, Maintenance, Training and Certification, Auxiliary Systems, Emergency Preparedness, Technical Support, Packaging and Transportation, Nuclear Criticality Safety, Security/Safety Interface, Experimental Activities, Site/Facility Safety Review, Radiological Protection, Personnel Protection, Worker Safety and Health (OSHA) Compliance, Fire Protection, Aviation Safety, Medical Services, and Firearms Safety

  4. Path to 'Stardom' in Globally Distributed Hybrid Teams

    DEFF Research Database (Denmark)

    Sarker, Suprateek; Hove-Kirkeby, Sarah; Sarker, Saonee

    2011-01-01

    recognition that specific individuals within such teams are often critical to the team's performance. Consequently, existing knowledge about such teams may be enhanced by examining the factors that affect the performance of individual team members. This study attempts to address this need by identifying...... individuals who emerge as “stars” in globally distributed teams involved in knowledge work such as information systems development (ISD). Specifically, the study takes a knowledge-centered view in explaining which factors lead to “stardom” in such teams. Further, it adopts a social network approach consistent......Although distributed teams have been researched extensively in information systems and decision science disciplines, a review of the literature suggests that the dominant focus has been on understanding the factors affecting performance at the team level. There has however been an increasing...

  5. A systematic review of the published literature on team-based learning in health professions education.

    Science.gov (United States)

    Reimschisel, Tyler; Herring, Anna L; Huang, Jennifer; Minor, Tara J

    2017-12-01

    Summarize the published literature on team-based learning (TBL) in health professions education (HPE) using the TBL conceptual framework to identify gaps that can guide future research Methods: PubMed, Web of Science, ERIC, and Google Scholar were searched through May 2016 for English-language articles regarding the use of TBL in HPE. Reviewers independently extracted data and coded for the seven elements in Michaelsen's Model of TBL. A total of 118 articles met inclusion criteria. The number of articles published yearly on TBL has grown steadily, more than tripling between 2011 and 2016. Most studies (55; 47%) involved undergraduate medical students and took place in the US (72; 61%). The most commonly studied framework component was Teacher and Learner Attitudes (97; 82%). Other commonly studied elements included Learning Outcomes (85; 72%) and Team Characteristics (25; 21%). Contextual Factors affecting TBL was addressed in one study. A substantial body of literature examines the effect that TBL has on traditional measures of achievement. However, many dimensions of TBL have not been well studied, including Teacher Decisions about TBL, Contextual Factors that affect TBL, Learners' Engagement, and Pattern of Engagement within Teams. Future research in these areas could determine the best use of TBL in HPE.

  6. International Journal of Development and Management Review

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... social Development and Management practices and theories while providing an institutional ... The Igbo care for the elderly in contemporary times: an old testament evaluation ...

  7. Approach to team skills training of nuclear power plant control room crews

    International Nuclear Information System (INIS)

    Davis, L.T.; Gaddy, C.D.; Turney, J.R.

    1985-07-01

    An investigation of current team skills training practices and research was conducted by General Physics Corporation for the Office of Nuclear Reactor Regulation. The methodology used included a review of relevant team skills training literature and a workshop to collect inputs from team training practitioners and researchers from the public and private sectors. The workshop was attended by representatives from nuclear utility training organizations, the commercial airline industry, federal agencies, and defense training and research commands. The literature reviews and workshop results provided the input for a suggested approach to team skills training that can be integrated into existing training programs for control room operating crews. The approach includes five phases: (1) team skills objectives development, (2) basic team skills training, (3) team task training, (4) team skills evaluation, and (5) team training program evaluation. Supporting background information and a user-oriented description of the approach to team skills training are provided. 47 refs

  8. Opening the black box: knowledge creation in data teams

    NARCIS (Netherlands)

    Hubers, Mireille Desirée; Poortman, Cindy Louise; Schildkamp, Kim; Pieters, Julius Marie; Handelzalts, Adam

    2016-01-01

    Purpose – In this study, Nonaka and Takeuchi’s socialization, externalization, combination and internalization (SECI) model of knowledge creation is used to gain insight into the process of knowledge creation in data teams. These teams are composed of school leaders and teachers, who work together

  9. Teams and teamwork at NASA Langley Research Center

    Science.gov (United States)

    Dickinson, Terry L.

    1994-01-01

    The recent reorganization and shift to managing total quality at the NASA Langley Research Center (LaRC) has placed an increasing emphasis on teams and teamwork in accomplishing day-to-day work activities and long-term projects. The purpose of this research was to review the nature of teams and teamwork at LaRC. Models of team performance and teamwork guided the gathering of information. Current and former team members served as participants; their collective experience reflected membership in over 200 teams at LaRC. The participants responded to a survey of open-ended questions which assessed various aspects of teams and teamwork. The participants also met in a workshop to clarify and elaborate on their responses. The work accomplished by the teams ranged from high-level managerial decision making (e.g., developing plans for LaRC reorganization) to creating scientific proposals (e.g., describing spaceflight projects to be designed, sold, and built). Teams typically had nine members who remained together for six months. Member turnover was around 20 percent; this turnover was attributed to heavy loads of other work assignments and little formal recognition and reward for team membership. Team members usually shared a common and valued goal, but there was not a clear standard (except delivery of a document) for knowing when the goal was achieved. However, members viewed their teams as successful. A major factor in team success was the setting of explicit a priori rules for communication. Task interdependencies between members were not complex (e.g., sharing of meeting notes and ideas about issues), except between members of scientific teams (i.e., reliance on the expertise of others). Thus, coordination of activities usually involved scheduling and attendance of team meetings. The team leader was designated by the team's sponsor. This leader usually shared power and responsibilities with other members, such that team members established their own operating

  10. 78 FR 70598 - Submission for Review: Request for External Review (3206-NEW); Model Notice of Final Internal...

    Science.gov (United States)

    2013-11-26

    ... notice to enrollees about the result of any final internal adverse benefit determination, their external... OFFICE OF PERSONNEL MANAGEMENT Submission for Review: Request for External Review (3206-NEW); Model Notice of Final Internal Adverse Benefit Determination and Case Intake Form AGENCY: U.S. Office of...

  11. 32 CFR Appendix B to Part 327 - Internal Management Control Review Checklist

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Internal Management Control Review Checklist B... B to Part 327—Internal Management Control Review Checklist (a) Task: Personnel and/or Organization... See footnote 2 to this Appendix B. (1) I attest that the above listed internal controls provide...

  12. Internal quality assurance reviews: challenges and processes ...

    African Journals Online (AJOL)

    Internal quality assurance reviews: challenges and processes – Walter Sisulu University\\'s Business, Management Sciences and Law Faculty. ... This article examines some of the challenges and processes followed by six of the departments ...

  13. Report on the emergency evacuation review team on emergency response plans for the Perry and Davis-Besse nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    This book is a report by Ohio's Emergency Evacuation Review Team, at the request of Governor Richard Celeste. The Team concludes that the current emergency response plan for Ohio's reactors is inadequate to protect the public and recommends changes in the current emergency plant requirements. The report also includes a summary of the litigation that has occurred since Celeste withdrew his support for the plans, a list of experts consulted, and sources used to prepare the report. An important document, and a study which every state should undertake

  14. IAEA Mission Concludes Peer Review of Pakistan's Nuclear Regulatory Framework

    International Nuclear Information System (INIS)

    2014-01-01

    An international team of senior nuclear safety experts today concluded a nine-day International Atomic Energy Agency (IAEA) mission to review the regulatory framework for the safety of operating nuclear power plants in the United States of America (USA). The Integrated Regulatory Review Service (IRRS) mission was a follow-up to the IRRS mission to the US Nuclear Regulatory Commission (NRC) that was conducted in 2010, with the key additional aim of reviewing whether the response of the US regulatory regime to the implications of the accident at TEPCO's Fukushima Daiichi Plant had been timely and effective. The mission team concluded that the recommendations and suggestions made by the 2010 IRRS mission have been taken into account systematically under the NRC's subsequent action plan, with significant progress in many areas and many improvements carried out. One of two recommendations and 19 out of 20 suggestions made by the 2010 IRRS mission have been effectively addressed and can therefore be considered closed. The outstanding recommendation relates to the NRC's review of its Management System, which is in the process of being finalised. The IRRS team also found that the NRC acted promptly and effectively after the Fukushima accident in the interests of public health and safety, and that the report of its Near-Term Task Force represents a sound and ample basis for taking into account the lessons learned from the accident

  15. A crisis of faith? A review of simulation in teaching team-based, crisis management skills to surgical trainees.

    Science.gov (United States)

    Doumouras, Aristithes G; Keshet, Itay; Nathens, Avery B; Ahmed, Najma; Hicks, Christopher M

    2012-01-01

    Team-based training using crisis resource management (CRM) has gained popularity as a strategy to minimize the impact of medical error during critical events. The purpose of this review was to appraise and summarize the design, implementation, and efficacy of peer-reviewed, simulation-based CRM training programs for postgraduate trainees (residents). Two independent reviewers conducted a structured literature review, querying multiple medical and allied health databases from 1950 to May 2010 (MEDLINE, EMBASE, CINAHL, EBM, and PsycINFO). We included articles that (1) were written in English, (2) were published in peer-reviewed journals, (3) included residents, (4) contained a simulation component, and (5) included a team-based component. Peer-reviewed articles describing the implementation of CRM instruction were critically appraised using the Kirkpatrick framework for evaluating training programs. Fifteen studies involving a total of 404 residents met inclusion criteria; most studies reported high resident satisfaction for CRM training. In several CRM domains, residents demonstrated significant improvements after training, which did not decay over time. With regard to design, oral feedback may be equivalent to video feedback and single-day interventions may be as efficacious as multiple-day interventions for residents. No studies demonstrated a link between simulation-based CRM training and performance during real-life critical events. The findings support the utility of CRM programs for residents. A high degree of satisfaction and perceived value reflect robust resident engagement. The iteration of themes from our review provides the basis for the development of best practices in curricula design. A dearth of well-designed, randomized studies preclude the quantification of impact of simulation-based training in the clinical environment. Copyright © 2012 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  16. Characterizing Distributed Concurrent Engineering Teams: A Descriptive Framework for Aerospace Concurrent Engineering Design Teams

    Science.gov (United States)

    Chattopadhyay, Debarati; Hihn, Jairus; Warfield, Keith

    2011-01-01

    As aerospace missions grow larger and more technically complex in the face of ever tighter budgets, it will become increasingly important to use concurrent engineering methods in the development of early conceptual designs because of their ability to facilitate rapid assessments and trades in a cost-efficient manner. To successfully accomplish these complex missions with limited funding, it is also essential to effectively leverage the strengths of individuals and teams across government, industry, academia, and international agencies by increased cooperation between organizations. As a result, the existing concurrent engineering teams will need to increasingly engage in distributed collaborative concurrent design. This paper is an extension of a recent white paper written by the Concurrent Engineering Working Group, which details the unique challenges of distributed collaborative concurrent engineering. This paper includes a short history of aerospace concurrent engineering, and defines the terms 'concurrent', 'collaborative' and 'distributed' in the context of aerospace concurrent engineering. In addition, a model for the levels of complexity of concurrent engineering teams is presented to provide a way to conceptualize information and data flow within these types of teams.

  17. IAEA Completes Safety Review at Czech Nuclear Power Plant

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An international team of nuclear safety experts, led by the International Atomic Energy Agency (IAEA), today completed a review of safety practices at Temelin Nuclear Power Station in the Czech Republic. The team highlighted the Power Plant's good practices and also recommended improvements to some safety measures. At the request of the Government of the Czech Republic, the IAEA assembled a team of nuclear installation safety experts to send an Operational Safety Review Team (OSART) to the Power Plant, and the mission was conducted from 5 to 22 November 2012. The team was comprised of experts from Brazil, Hungary, Slovakia, South Africa, Sweden, Ukraine and the United Kingdom. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the Plant's overall safety status. The team at Temelin conducted an in-depth review of the functions essential to the safe operation of the Power Plant, which are under the responsibility of the site's management. The review covered the areas of management, organization and administration; operations; maintenance; technical support; operating experience; radiation protection; chemistry; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of potential application elsewhere. Examples include the following: - The Power Plant has adopted effective computer software to improve the efficiency of the plant to prepare and isolate equipment for maintenance; - The Power Plant undertakes measures to control precisely the chemical parameters that limit corrosion in the reactor's coolant system, which in turn reduce radiation exposure to the workforce; and - The Temelin

  18. Ten principles of good interdisciplinary team work.

    Science.gov (United States)

    Nancarrow, Susan A; Booth, Andrew; Ariss, Steven; Smith, Tony; Enderby, Pam; Roots, Alison

    2013-05-10

    Interdisciplinary team work is increasingly prevalent, supported by policies and practices that bring care closer to the patient and challenge traditional professional boundaries. To date, there has been a great deal of emphasis on the processes of team work, and in some cases, outcomes. This study draws on two sources of knowledge to identify the attributes of a good interdisciplinary team; a published systematic review of the literature on interdisciplinary team work, and the perceptions of over 253 staff from 11 community rehabilitation and intermediate care teams in the UK. These data sources were merged using qualitative content analysis to arrive at a framework that identifies characteristics and proposes ten competencies that support effective interdisciplinary team work. Ten characteristics underpinning effective interdisciplinary team work were identified: positive leadership and management attributes; communication strategies and structures; personal rewards, training and development; appropriate resources and procedures; appropriate skill mix; supportive team climate; individual characteristics that support interdisciplinary team work; clarity of vision; quality and outcomes of care; and respecting and understanding roles. We propose competency statements that an effective interdisciplinary team functioning at a high level should demonstrate.

  19. International physical protection self-assessment tool for chemical facilities.

    Energy Technology Data Exchange (ETDEWEB)

    Tewell, Craig R.; Burdick, Brent A.; Stiles, Linda L.; Lindgren, Eric Richard

    2010-09-01

    This report is the final report for Laboratory Directed Research and Development (LDRD) Project No.130746, International Physical Protection Self-Assessment Tool for Chemical Facilities. The goal of the project was to develop an exportable, low-cost, computer-based risk assessment tool for small to medium size chemical facilities. The tool would assist facilities in improving their physical protection posture, while protecting their proprietary information. In FY2009, the project team proposed a comprehensive evaluation of safety and security regulations in the target geographical area, Southeast Asia. This approach was later modified and the team worked instead on developing a methodology for identifying potential targets at chemical facilities. Milestones proposed for FY2010 included characterizing the international/regional regulatory framework, finalizing the target identification and consequence analysis methodology, and developing, reviewing, and piloting the software tool. The project team accomplished the initial goal of developing potential target categories for chemical facilities; however, the additional milestones proposed for FY2010 were not pursued and the LDRD funding therefore was redirected.

  20. Individual motivation and threat indicators of collaboration readiness in scientific knowledge producing teams: a scoping review and domain analysis

    Directory of Open Access Journals (Sweden)

    Gaetano R. Lotrecchiano

    2016-05-01

    Full Text Available This paper identifies a gap in the team science literature that considers intrapersonal indicators of collaboration as motivations and threats to participating in collaborative knowledge producing teams (KPTs. Through a scoping review process, over 150 resources were consulted to organize 6 domains of motivation and threat to collaboration in KPTs: Resource Acquisition, Advancing Science, Building Relationships, Knowledge Transfer, Recognition and Reward, and Maintenance of Beliefs. Findings show how domains vary in their presentation of depth and diversity of motivation and threat indicators as well as their relationship with each other within and across domains. The findings of 51 indicators resulting from the review provide a psychosocial framework for which to establish a hierarchy of collaborative reasoning for individual engagement in KPTs thus allowing for further research into the mechanism of collaborative engagement. The indicators serve as a preliminary step in establishing a protocol for testing of the psychometric properties of intrapersonal measures of collaboration readiness.

  1. Multinational teams in European and American companies

    OpenAIRE

    Numic, Aida

    2007-01-01

    Incorporating team context into research and practice concerning team effectiveness in multinational organizations still remains an ongoing challenge. The purpose of this dissertation was to explore the influence of industry, corporate culture, structure, strategy and task characteristics on MNTs in business organizations and to develop a more comprehensive framework connecting the internal dynamics with contextual aspects of MNTs functioning in companies in Europe and the USA. The study was ...

  2. Results of a Quality Assurance Review of External Beam Radiation Therapy in the International Society of Paediatric Oncology (Europe) Neuroblastoma Group's High-risk Neuroblastoma Trial: A SIOPEN Study

    International Nuclear Information System (INIS)

    Gaze, Mark N.; Boterberg, Tom; Dieckmann, Karin; Hörmann, Marcus; Gains, Jennifer E.; Sullivan, Kevin P.; Ladenstein, Ruth

    2013-01-01

    Purpose: Radiation therapy is important for local control in neuroblastoma. This study reviewed the compliance of plans with the radiation therapy guidelines of the International Society of Paediatric Oncology (Europe) Neuroblastoma Group (SIOPEN) High-Risk Trial protocol. Methods and Materials: The SIOPEN trial central electronic database has sections to record diagnostic imaging and radiation therapy planning data. Individual centers may upload data remotely, but not all centers involved in the trial chose to use this system. A quality scoring system was devised based on how well the radiation therapy plan matched the protocol guidelines, to what extent deviations were justified, and whether adverse effects may result. Central review of radiation therapy planning was undertaken retrospectively in 100 patients for whom complete diagnostic and treatment sets were available. Data were reviewed and compared against protocol guidelines by an international team of radiation oncologists and radiologists. For each patient in the sample, the central review team assigned a quality assurance score. Results: It was found that in 48% of patients there was full compliance with protocol requirements. In 29%, there were deviations for justifiable reasons with no likely long-term adverse effects resulting. In 5%, deviations had occurred for justifiable reasons, but that might result in adverse effects. In 1%, there was a deviation with no discernible justification, which would not lead to long-term adverse events. In 17%, unjustified deviations were noted, with a risk of an adverse outcome resulting. Conclusions: Owing to concern over the proportion of patients in whom unjustified deviations were observed, a protocol amendment has been issued. This offers the opportunity for central review of radiation therapy plans before the start of treatment and the treating clinician a chance to modify plans.

  3. IAEA Issues Report on Mission to Review Japan's Nuclear Power Plant Safety Assessment Process

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: A team of international nuclear safety experts has delivered its report on a mission it conducted from 21-31 January 2012 to review Japan's process for assessing nuclear safety at the nation's nuclear power plants. International Atomic Energy Agency (IAEA) officials delivered the IAEA Mission Report to Japanese officials yesterday and made it publicly available today. Following the 11 March 2011 accident at TEPCO's Fukushima Daiichi Nuclear Power Station, Japan's Nuclear and Industrial Safety Agency (NISA) announced the development of a revised safety assessment process for the nation's nuclear power reactors. At the request of the Government of Japan, the IAEA organized a team of five IAEA and three international nuclear safety experts and visited Japan to review NISA's approach to the Comprehensive Assessments for the Safety of Existing Power Reactor Facilities and how NISA examines the results submitted by nuclear operators. A Preliminary Summary Report was issued on 31 January. 'The mission report provides additional information regarding the team's recommendations and overall finding that NISA's instructions to power plants and its review process for the Comprehensive Safety Assessments are generally consistent with IAEA Safety Standards', said team leader James Lyons, Director of the IAEA's Nuclear Installation Safety Division. National safety assessments and their peer review by the IAEA are a key component of the IAEA Action Plan on Nuclear Safety, which was approved by the Agency's Member States following last year's nuclear accident at Fukushima Daiichi Nuclear Power Station. The IAEA safety review mission held meetings in Tokyo with officials from NISA, the Japanese Nuclear Energy Safety Organization (JNES), and the Kansai Electric Power Company (KEPCO), and the team visited the Ohi Nuclear Power Station to see an example of how Japan's Comprehensive Safety Assessment is being implemented by nuclear operators. In its report delivered today

  4. A Review of Antecedents of International Strategic Alliance Performance

    DEFF Research Database (Denmark)

    Christoffersen, Jeppe

    2013-01-01

    This paper provides a systematic review of 165 empirical studies on the antecedents of performance in international strategic alliances. It provides the most detailed display of definitions, rationales, measures and findings currently available. Hence, this state-of-the art literature review...

  5. Comet 67P/Churyumov-Gerasimenko Surface Composition as a Playground for Radiative Transfer Modeling and Laboratory Measurements: an international ISSI team

    Science.gov (United States)

    Stephan, K.; Ciarniello, M.; Beck, P.; Filacchione, G.; Moroz, L.; Pilorget, C.; Pommerol, A.; Quirico, E.; Raponi, A.; Schröder, S.; Kappel, D.; Vinogradoff, V.; Istiqomah, I.; Rousseau, B.

    2017-12-01

    Remote sensing observations at visible-infrared (VIS-IR) wavelengths of the nucleus of comet 67P/Churyumov-Gerasimenko performed by VIRTIS (Coradini et al., 2007) aboard the Rosetta mission have revealed a surface ubiquitously covered by low-albedo material (Capaccioni et al., 2015; Ciarniello et al., 2015), characterized by the presence of refractory and semi-volatile organics and dark opaque phases (Capaccioni et al., 2015; Quirico et al., 2016). However, a quantitative determination of the physical properties (grain size, porosity) and chemical composition of the surface regolith, from spectrophotometric analysis, is still missing. This subject will be investigated within an international team hosted by ISSI (International Space Science Institute), taking advantage of available and dedicated laboratory reflectance measurements on cometary analogue samples and radiative transfer models (Hapke, 2012; Shkuratov et al., 1999; Monte Carlo ray-tracing), applied to Rosetta spectrophotometric observations of the nucleus. The convergence between models and measurements will allow us to provide a thorough characterization of 67P/Churyumov-Gerasimenko surface. At the same time, the comparison of theoretical predictions with results from laboratory reflectance spectroscopy on powders of analog materials give us the possibility to constrain the capability of the models to characterize their composition (endmember abundances and mixing modalities) and physical properties. We report about the state of the art of laboratory reflectance spectroscopy and spectral modeling applied to 67P/Churyumov-Gerasimenko VIS-IR spectrum as well as preliminary results of the team activity and planned future work. Acknowledgements: the team thanks ISSI-Switzerland for the logistic and financial support.

  6. Role of culture in international business: A synthetic review

    Directory of Open Access Journals (Sweden)

    Krzysztof Wach

    2016-10-01

    Full Text Available The main objective of the paper is to discuss the role of culture in international business and to present main dimensions and typologies of cultural behaviours while doing business internationally. The article is organised in two sections. At first, cultural context of international business and entrepreneurship is discussed, which constitutes a separate research stream within the international entrepreneurship domain. The second passage is dedicated to the various most important classifications and typologies of cultural behaviours in international business. The article is a typical literature review.

  7. Assessment of the effectiveness of the Hungarian nuclear safety regulatory authority by international expert teams

    International Nuclear Information System (INIS)

    Voeroess, L.; Lorand, F.

    2001-01-01

    On the basis of the role nuclear regulatory authorities (NRA) have to fulfil and the new challenges affecting them, in the paper an overview is made on how the Hungarian NRA has evaluated and utilised the results of different international efforts in the enhancement of its effectiveness and efficiency. The reviews have been conducted by different groups of experts organised by highly recognised international organisations (e.g. IAEA, EC) and highly competent foreign regulatory bodies. The different reviews of activities and working conditions of the HAEA NSD have resulted in a generally positive picture, however, it also revealed weaknesses as well. They recognised the developments made in recent years and also appreciated the overall favourable level of nuclear safety in Hungary, identified 'good practices' and made recommendations and suggestions for the most important and most efficient ways for future improvements. These are cited or referenced in the paper. At the end, some recommendations have been formed based on the experiences gained from the review missions and from our self-assessment. (author)

  8. Development of Safety Review Guide for the Periodic Safety Review of Reactor Vessel Internals

    International Nuclear Information System (INIS)

    Park, Jeongsoon; Ko, Hanok; Kim, Seonjae; Jhung, Myungjo

    2013-01-01

    Aging management of the reactor vessel internals (RVIs) is one of the important issues for long-term operation of nuclear power plants (NPPs). Safety review on the assessment and management of the RVI aging is conducted through the process of a periodic safety review (PSR). The regulatory body should check that reactor facilities sustain safety functions in light of degradation due to aging and that the operator of a nuclear power reactor establishes and implements management program to deal with degradation due to aging in order to guarantee the safety functions and the safety margin as a result of PSR. KINS(Korea Institute of Nuclear Safety) has utilized safety review guides (SRG) which provide guidance to KINS staffs in performing safety reviews in order to assure the quality and uniformity of staff safety reviews. The KINS SRGs for the continued operation of pressurized water reactors (PWRs) published in 2006 contain areas of review regarding aging management of RVIs in chapter 2 (III.2.15, Appendix 2.0.1). However unlike the SRGs for the continued operation, KINS has not officially published the SRGs for the PSR of PWRs, but published them as a form of the research report. In addition to that, the report provides almost same review procedures for aging assessment and management of RVIs with the ones provided in the SRGs for the continued operation, it cannot provide review guidance specific to PSRs. Therefore, a PSR safety review guide should be developed for RVIs in PWRs. In this study, a draft PSR safety review guide for reactor vessel internals in PWRs is developed and provided. In this paper, a draft PSR safety review guide for reactor vessel internals (PSR SRG-RVIs) in PWRs is introduced and main contents of the draft are provided. However, since the PSR safety review guides for areas other than RVIs in the pressurized water reactors (PWRs) are expected to be developed in the near future, the draft PSR SRG-RVIs should be revisited to be compatible with

  9. Primary care team working in Ireland: a qualitative exploration of team members' experiences in a new primary care service.

    Science.gov (United States)

    Kennedy, Norelee; Armstrong, Claire; Woodward, Oonagh; Cullen, Walter

    2015-07-01

    Team working is an integral aspect of primary care, but barriers to effective team working can limit the effectiveness of a primary care team (PCT). The establishment of new PCTs in Ireland provides an excellent opportunity to explore team working in action. The aim of this qualitative study was to explore the experiences of team members working in a PCT. Team members (n = 19) from two PCTs were interviewed from May to June 2010 using a semi-structured interview guide. All interviews were audio-recorded and transcribed. Data were analysed using NVivo (version 8). Thematic analysis was used to explore the data. We identified five main themes that described the experiences of the team members. The themes were support for primary care, managing change, communication, evolution of roles and benefits of team working. Team members were generally supportive of primary care and had experienced benefits to their practice and to the care of their patients from participation in the team. Regular team meetings enabled communication and discussion of complex cases. Despite the significant scope for role conflict due to the varied employment arrangements of the team members, neither role nor interpersonal conflict was evident in the teams studied. In addition, despite the unusual team structure in Irish PCTs - where there is no formally appointed team leader or manager - general issues around team working and its benefits and challenges were very similar to those found in other international studies. This suggests, in contrast to some studies, that some aspects of the leadership role may not be as important in successful PCT functioning as previously thought. Nonetheless, team leadership was identified as an important issue in the further development of the teams. © 2014 John Wiley & Sons Ltd.

  10. Perturbed Communication in a Virtual Environment to Train Medical Team Leaders

    OpenAIRE

    Huguet , Lauriane; Lourdeaux , Domitile; Sabouret , Nicolas; Ferrer , Marie-Hélène

    2016-01-01

    International audience; The VICTEAMS project aims at designing a virtual environment for training medical team leaders to non-technical skills. The virtual environment ispopulated with autonomous virtual agents who are able to make mistakes (in action or communication) in order to train rescue team leaders and to make them adaptive with all kinds of situations or teams.

  11. International Experience in Upper Echelon Theory: Literature Review

    Directory of Open Access Journals (Sweden)

    Đerđa Dino

    2017-09-01

    Full Text Available Background: The international experience of top managers is an evolving research within the upper echelon theory; therefore this literature review summarizes everything made so far.

  12. An innovative addition to team-based-learning pedagogy to enhance teaching and learning: Students' perceptions of team exams.

    Science.gov (United States)

    Khansari, Parto S; Coyne, Leanne

    The study investigates students' perceptions of the value of implementing a team exam to enhance learning prior to a summative assessment. Team exams are similar to midterm exams, except that answering questions is a team effort. Data was collected from second year pharmacy students at California Northstate University College of Pharmacy (CNUCOP) through a self-administered online survey. The survey questions included closed-ended questions to evaluate students' perception on preparedness for a summative assessment and to rank advantages and disadvantages of the team exams. Of the 40 students who completed the survey (38% response rate), 100% of participants agreed that having a team exam prior to a major exam made them feel more prepared for a major summative exam. Ninety-seven percent of students believed that the team exam helped them to identify gaps in their knowledge and 85% agreed that taking a team exam reinforced their knowledge by teaching other students. The survey results did not identify any major disadvantages to holding a team exam. Students perceived that taking a team exam prior to a midterm exam is an effective approach to review the course contents and identify areas of improvement. Copyright © 2017. Published by Elsevier Inc.

  13. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams.

    Science.gov (United States)

    Van Hooft, Edwin A J; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team's life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams' composition in terms of individual-level trait procrastination, as well as the teams' motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members' stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams' collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  14. Team-based Service Delivery for Students with Disabilities: Practice Options and Guidelines for Success.

    Science.gov (United States)

    Ogletree, Billy T.; Bull, Jeannette; Drew, Ruby; Lunnen, Karen Y.

    2001-01-01

    This article reviews the assessment procedures, treatment procedures, and the advantages and disadvantages of three professional-family team models: multidisciplinary teams, interdisciplinary teams, and transdisciplinary teams. Guidelines for optimal team participation are provided. The importance of mission statements, communication, trust,…

  15. International Service Learning: Analytical Review of Published Research Literature

    Science.gov (United States)

    Dixon, Brett

    2015-01-01

    International service learning (ISL) is an emerging area of international education. This paper summarizes academic journal articles on ISL programs and organizes the relevant publications by academic disciplines, service learning project areas, and other topics. The basis for this review is relevant literature from full-text scholarly peer…

  16. A Data Scheduling and Management Infrastructure for the TEAM Network

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.; Unwin, R.

    2009-04-01

    The objective of the Tropical Ecology Assessment and Monitoring Network (www.teamnetwork.org) is "To generate real time data for monitoring long-term trends in tropical biodiversity through a global network of TEAM sites (i.e. field stations in tropical forests), providing an early warning system on the status of biodiversity to effectively guide conservation action". To achieve this, the TEAM Network operates by collecting data via standardized protocols at TEAM Sites. The standardized TEAM protocols include the Climate, Vegetation and Terrestrial Vertebrate Protocols. Some sites also implement additional protocols. There are currently 7 TEAM Sites with plans to grow the network to 15 by June 30, 2009 and 50 TEAM Sites by the end of 2010. Climate Protocol The Climate Protocol entails the collection of climate data via meteorological stations located at the TEAM Sites. This includes information such as precipitation, temperature, wind direction and strength and various solar radiation measurements. Vegetation Protocol The Vegetation Protocol collects standardized information on tropical forest trees and lianas. A TEAM Site will have between 6-9 1ha plots where trees and lianas larger than a pre-specified size are mapped, identified and measured. This results in each TEAM Site repeatedly measuring between 3000-5000 trees annually. Terrestrial Vertebrate Protocol The Terrestrial Vertebrate Protocol collects standardized information on mid-sized tropical forest fauna (i.e. birds and mammals). This information is collected via camera traps (i.e. digital cameras with motion sensors housed in weather proof casings). The images taken by the camera trap are reviewed to identify what species are captured in the image by the camera trap. The image and the interpretation of what is in the image are the data for the Terrestrial Vertebrate Protocol. The amount of data collected through the TEAM protocols provides a significant yet exciting IT challenge. The TEAM Network is

  17. International nursing students and what impacts their clinical learning: literature review.

    Science.gov (United States)

    Edgecombe, Kay; Jennings, Michele; Bowden, Margaret

    2013-02-01

    This paper reviews the sparse literature about international nursing students' clinical learning experiences, and also draws on the literature about international higher education students' learning experiences across disciplines as well as nursing students' experiences when undertaking international clinical placements. The paper aims to identify factors that may impact international nursing students' clinical learning with a view to initiating further research into these students' attributes and how to work with these to enhance the students' clinical learning. Issues commonly cited as affecting international students are socialisation, communication, culture, relationships, and unmet expectations and aspirations. International student attributes tend to be included by implication rather than as part of the literature's focus. The review concludes that recognition and valuing of international nursing students' attributes in academic and clinical contexts are needed to facilitate effective strategies to support their clinical practice in new environments. Copyright © 2012. Published by Elsevier Ltd.

  18. Can hospital audit teams identify case management problems, analyse their causes, identify and implement improvements? A cross-sectional process evaluation of obstetric near-miss case reviews in Benin

    Science.gov (United States)

    2012-01-01

    Background Obstetric near-miss case reviews are being promoted as a quality assurance intervention suitable for hospitals in low income countries. We introduced such reviews in five district, regional and national hospitals in Benin, West Africa. In a cross-sectional study we analysed the extent to which the hospital audit teams were able to identify case management problems (CMPs), analyse their causes, agree on solutions and put these solutions into practice. Methods We analysed case summaries, women’s interview transcripts and audit minutes produced by the audit teams for 67 meetings concerning one woman with near-miss complications each. We compared the proportion of CMPs identified by an external assessment team to the number found by the audit teams. For the latter, we described the CMP causes identified, solutions proposed and implemented by the audit teams. Results Audit meetings were conducted regularly and were well attended. Audit teams identified half of the 714 CMPs; they were more likely to find managerial ones (71%) than the ones relating to treatment (30%). Most identified CMPs were valid. Almost all causes of CMPs were plausible, but often too superficial to be of great value for directing remedial action. Audit teams suggested solutions, most of them promising ones, for 38% of the CMPs they had identified, but recorded their implementation only for a minority (8.5%). Conclusions The importance of following-up and documenting the implementation of solutions should be stressed in future audit interventions. Tools facilitating the follow-up should be made available. Near-miss case reviews hold promise, but their effectiveness to improve the quality of care sustainably and on a large scale still needs to be established. PMID:23057707

  19. International spinal cord injury male sexual function and female sexual and reproductive function basic data sets-version 2.0

    DEFF Research Database (Denmark)

    Alexander, Marcalee S; New, Peter W; Biering-Sørensen, Fin

    2017-01-01

    S Scientific and Executive Committees and ASIA board of directors. RESULTS: The data sets were modified to a self-report format. They were reviewed for appropriateness for the pediatric age group and adapted to include a new variable to address the issue of sexual orientation. A clarification of the difference......STUDY DESIGN: Data set review and modification. OBJECTIVE: To describe modifications in the International Spinal Cord Injury (SCI) Male Sexual Function Basic Data Set Version 2.0 and the International SCI Female Sexual and Reproductive Function Basic Data Set Version 2.0. SETTING: International...... expert work group using on line communication. METHODS: An international team of experts was compiled to review and revise the International SCI Male Sexual Function and Female Sexual and Reproductive Function Basic Data Sets Version 1.0. The group adapted Version 1.0 based upon review of published...

  20. Book Review: Current Issues in International Human Resource Management and Strategy Research

    DEFF Research Database (Denmark)

    Gretzinger, Susanne

    2009-01-01

    The article reviews the book "Current Issues in International Human Resource Management and Strategy Research," edited by Marion Festing and Susanne Royer.......The article reviews the book "Current Issues in International Human Resource Management and Strategy Research," edited by Marion Festing and Susanne Royer....

  1. IAEA Completes Nuclear Security Review Mission in Republic of Korea

    International Nuclear Information System (INIS)

    2014-01-01

    Full text: A team of International Atomic Energy Agency (IAEA) experts today completed a mission to review national nuclear security practices in the Republic of Korea. At the request of the Government of the ROK, the IAEA conducted a two-week International Physical Protection Advisory Service (IPPAS) mission that reviewed the nation's nuclear security-related legislative and regulatory framework for nuclear and other radioactive material and associated facilities, as well as security arrangements applied to the transport of nuclear material and radioactive sources, and to computer systems. In addition, the team reviewed physical protection systems at the Hanbit Nuclear Power Plant (NPP), operated by Korea Hydro and Nuclear Power Company (KHNP), and at the High-Flux Advanced Neutron Application Reactor (HANARO), operated by the Korea Atomic Energy Research Institute (KAERI). The IPPAS team concluded that Korea is working well to conduct strong and sustainable nuclear security activities. Moreover, the team identified a number of good practices in the national nuclear security regime, and at the visited facilities. The team also made recommendations and suggestions for continuous improvement in nuclear security. The IAEA team was led by Joseph Sandoval, a staff member at the Sandia National Laboratories in the United States, and it included eight experts from six nations and the IAEA. The team met in Daejeon with officials from the Nuclear Safety and Security Commission (NSSC), representatives of the Korea Institute of Nuclear Non-Proliferation and Control (KINAC), the Korea Institute of Nuclear Safety (KINS), KAERI, and the Korea Electric Power Corporation Nuclear Fuel (KEPCO NF). They conducted site visits to the Hanbit NPP, the HANARO research reactor, the irradiation facility at KAERI's Advanced Radiation Technology Institute (ARTI), and the KHNP Cyber Security Center. ''Successful development of a nuclear power programme necessitates a strong commitment to

  2. UH team expands big-bang theory

    CERN Multimedia

    Creamer, B

    2002-01-01

    After six months of research at a new underground neutrino detector near the central Japan city of Toyama, an international research team announced yesterday that neutrinos have mass and are capable of morphing from one type to another (1 page).

  3. Stable structures of coalitions in competitive and altruistic military teams

    Science.gov (United States)

    Aurangzeb, M.; Mikulski, D.; Hudas, G.; Lewis, F. L.; Gu, Edward

    2013-05-01

    In heterogeneous battlefield teams, the balance between team and individual objectives forms the basis for the internal topological structure of teams. The stability of team structure is studied by presenting a graphical coalitional game (GCG) with Positional Advantage (PA). PA is Shapley value strengthened by the Axioms of value. The notion of team and individual objectives is studied by defining altruistic and competitive contribution made by an individual; altruistic and competitive contributions made by an agent are components of its total or marginal contribution. Moreover, the paper examines dynamic team effects by defining three online sequential decision games based on marginal, competitive and altruistic contributions of the individuals towards team. The stable graphs under these sequential decision games are studied and found to be structurally connected, complete, or tree respectively.

  4. IAEA Completes Nuclear Security Review Mission in United States

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: A team of nuclear security experts led by the International Atomic Energy Agency (IAEA) today completed a mission to review nuclear security practices of civil nuclear facilities licensed by the United States Nuclear Regulatory Commission (NRC). Conducted at the U.S. Government's request, the two-week International Physical Protection Advisory Service (IPPAS) mission reviewed the United States' nuclear security-related legislative and regulatory framework. As part of this work, the IPPAS team, led by John O'Dacre of Canada and comprising nine experts from eight IAEA Member States, met with NRC officials and reviewed the physical protection systems at the Center for Neutron Research (NCNR) at the National Institute of Standards and Technology. The IPPAS team concluded that nuclear security within the U.S. civil nuclear sector is robust and sustainable and has been significantly enhanced in recent years. The team identified a number of good practices in the nation's nuclear security regime and at the NCNR. The IPPAS team also made a recommendation and some suggestions for the continuing improvement of nuclear security overall. The mission in the United States was the 60th IPPAS mission organized by the IAEA. 'Independent international peer reviews such as IAEA IPPAS missions are increasingly being recognized for their value as a key component for exchanges of views and advice on nuclear security measures', said Khammar Mrabit, Director of the IAEA Office of Nuclear Security. 'The good practices identified during this mission will contribute to the continuous improvements of nuclear security in other Member States'. The IPPAS team provided a draft report to the NRC and will submit a final report soon. Because it contains security-related information about a specific nuclear site, IPPAS reports are not made public. 'The IPPAS programme gives us a chance to learn from the experience and perspective of our international partners', said NRC Chairman Allison M

  5. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Science.gov (United States)

    Van Hooft, Edwin A. J.; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination. PMID:29674991

  6. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Directory of Open Access Journals (Sweden)

    Edwin A. J. Van Hooft

    2018-04-01

    Full Text Available Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  7. Motivational needs on team performance of Korean nursing students.

    Science.gov (United States)

    Yi, Y J; Park, K H

    2015-03-01

    The purpose of this study was to examine the effects of an individual's motivational needs on team performance, centering on the needs for affiliation, power and achievement, following the McClelland's Achievement Motivation Theory. Most previous studies related to McClelland's Achievement Motivation Theory have focused on achievement motivation as a predictor of team performance. In contrast, affiliation and power motivations were relatively little known in connection with team performance. This was a descriptive, cross-sectional study using data from 181 junior nursing students in Korea. Data were collected from a questionnaire when the subjects' teamwork task was completed in November 2013. Multiple regression analysis was used to examine the influence of motivational needs on team performance. Each group having high levels of the need for affiliation, or the need for power and/or the need for achievement showed a significantly high level of teamwork skills and team effectiveness. The factors influencing teamwork skills were the need for affiliation and the need for achievement. Additionally, the factors influencing team effectiveness were also the need for affiliation and the need for achievement. The study reconfirmed the positive influence of the need for achievement, which was the focus of most previous research, in regard to personal and organizational growth. Furthermore, it identified that the need for affiliation, another type of internal motive, positively affected team performance as well. Nursing schools and nursing organizations should pay attention to their members' affiliation and achievement needs to enhance organizational efficiencies. Through efforts such as developing diverse continuing education programmes for need training, they could enhance their members' needs for affiliation or achievement and consequently increase nursing team performance. © 2014 International Council of Nurses.

  8. Team Learning and Team Composition in Nursing

    Science.gov (United States)

    Timmermans, Olaf; Van Linge, Roland; Van Petegem, Peter; Elseviers, Monique; Denekens, Joke

    2011-01-01

    Purpose: This study aims to explore team learning activities in nursing teams and to test the effect of team composition on team learning to extend conceptually an initial model of team learning and to examine empirically a new model of ambidextrous team learning in nursing. Design/methodology/approach: Quantitative research utilising exploratory…

  9. Diversity, newcomers and team innovation : The importance of a common identity

    NARCIS (Netherlands)

    Rink, F.A.; Ellemers, N.; Phillips, KW

    2008-01-01

    In this chapter, we introduce a theoretical model to explain under which conditions different insights or approaches within a team do not necessarily undermine team cohesiveness or prevent the development of a common team identity, and can in fact even reinforce each other. We will review a program

  10. The impact of team familiarity and team leader experience on team coordination errors: A panel analysis of professional basketball teams

    NARCIS (Netherlands)

    Sieweke, Jost; Zhao, B.

    2015-01-01

    To explore the dynamics involved in team coordination, we examine the impact of team familiarity and team leader experience on team coordination errors (TCEs). We argue that team familiarity has a U-shaped effect on TCEs. We study the moderating effects of team leader prior experience and team

  11. Interdisciplinary team working in physical and rehabilitation medicine.

    Science.gov (United States)

    Neumann, Vera; Gutenbrunner, Christoph; Fialka-Moser, Veronika; Christodoulou, Nicolas; Varela, Enrique; Giustini, Alessandro; Delarque, Alain

    2010-01-01

    Effective team working plays a crucial role in Physical and Rehabilitation Medicine (PRM). As part of its role of optimizing and harmonizing clinical practice across Europe, the Professional Practice Committee of Union of European Medical Specialists (UEMS) Physical and Rehabilitation Medicine (PRM) Section reviewed patterns of team working and debated recommendations for good practice at a meeting of national UEMS delegates held in Riga, Latvia, in September 2008. This consensus statement is derived from that discussion and from a review of the literature concerning team working. Effective team working produces better patient outcomes (including better survival rates) in a range of disorders, notably following stroke. There is limited published evidence concerning what constitute the key components of successful teams in PRM programmes. However, the theoretical basis for good team working has been well-described in other settings and includes agreed aims, agreement and understanding on how best to achieve these, a multi-professional team with an appropriate range of knowledge and skills, mutual trust and respect, willingness to share knowledge and expertise and to speak openly. UEMS PRM Section strongly recommends this pattern of working. PRM specialists have an essential role to play in interdisciplinary teams; their training and specific expertise enable them to diagnose and assess severity of health problems, a prerequisite for safe intervention. Training spans 4-5 years in Europe, and includes knowledge and critical analysis of evidence-based rehabilitation strategies. PRM physicians are therefore well-placed to coordinate PRM programmes and to develop and evaluate new management strategies. Their broad training also means that they are able to take a holistic view of an individual patient's care.

  12. Challenging the premises of international policy review

    DEFF Research Database (Denmark)

    Feinstein, Noah Weeth; Læssøe, Jeppe; Blum, Nicole

    2013-01-01

    In 2009, a think tank called the International Alliance of Leading Education Institutes (IALEI) announced the results of a study entitled Climate Change and Sustainable Development: The Response from Education. Intended for a policy audience, the study offered a glimpse into the status of Education...... for Sustainable Development (ESD) and an early look at the emergence of Climate Change Education (CCE), in 10 different nations. As with most international reports, the IALEI report provoked many questions, some of which are more broadly relevant to scholarship and practice. This paper introduces a review...

  13. Tiger Team assessment of the Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1990-06-01

    This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment conducted at Brookhaven National Laboratory (BNL) in Upton, New York, between March 26 and April 27, 1990. The BNL is a multiprogram laboratory operated by the Associated Universities, Inc., (AUI) for DOE. The purpose of the assessment was to provide the status of environment, safety, and health (ES H) programs at the laboratory. The scope of the assessment included a review of management systems and operating procedures and records; observations of facility operations; and interviews at the facilities. Subteams in four areas performed the review: ES H, Occupational Safety and Health, and Management and Organization. The assessment was comprehensive, covering all areas of ES H activities and waste management operations. Compliance with applicable Federal, State, and local regulations; applicable DOE Orders; and internal BNL requirements was assessed. In addition, the assessment included an evaluation of the adequacy and effectiveness of the DOE and the site contractor, Associated Universities, Inc. (AUI), management, organization, and administration of the ES H programs at BNL. This volume contains appendices.

  14. Tiger Team assessment of the Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1990-06-01

    This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment conducted at Brookhaven National Laboratory (BNL) in Upton, New York, between March 26 and April 27, 1990. The BNL is a multiprogram laboratory operated by the Associated Universities, Inc., (AUI) for DOE. The purpose of the assessment was to provide the status of environment, safety, and health (ES H) programs at the Laboratory. The scope of the assessment included a review of management systems and operating procedures and records; observations of facility operations; and interviews at the facilities. Subteams in four areas performed the review: ES H, Occupational Safety and Health, and Management and Organization. The assessment was comprehensive, covering all areas of ES H activities and waste management operations. Compliance with applicable Federal, State, and local regulations; applicable DOE Orders; and internal BNL requirements was assessed. In addition, the assessment included an evaluation of the adequacy and effectiveness of the DOE and the site contractor, Associated Universities, Inc. (AUI), management, organization, and administration of the ES H programs at BNL.

  15. Safety Experts Complete IAEA Nuclear Regulatory Review of the United States

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of senior nuclear safety experts today completed a two-week International Atomic Energy Agency (IAEA) review of the governmental and regulatory framework for nuclear safety in the United States. The team identified good practices within the U.S. system and offered suggestions for ways the U.S. Nuclear Regulatory Commission (NRC) could improve. The IAEA has conveyed the team's main conclusions to the NRC, and a final report will be submitted to the NRC in about two months. At the request of the United States, the IAEA assembled a team of 19 international experts to conduct an Integrated Regulatory Review Service (IRRS) mission. This mission was a peer review based on the IAEA Safety Standards. It was not an inspection, nor an audit. The experts came from 14 different countries: Canada, China, the Czech Republic, Finland, France, Italy, Japan, Mexico, the Republic of Korea, Slovenia, Spain, Sweden, Switzerland, and the United Kingdom. Team leader Jukka Laaksonen of Finland said: ''We found a comprehensive, consistent, and mature regulatory system run by the NRC, which has a strong drive for continuous improvement.' The scope of the mission included the U.S. regulatory framework and the regulation of the nuclear plant operation. The mission was conducted from 18 to 29 October, mainly at NRC headquarters outside of Washington, D.C. To study U.S. regulatory activities, the mission conducted a series of interviews and discussions with NRC staff and other organizations to help assess the effectiveness of the regulatory system. In addition, the team observed regulatory activities at two operating nuclear power reactors and an emergency preparedness exercise. The IAEA's IRRS coordinator Gustavo Caruso said, ''This mission represents a milestone for the IRRS program because the U.S. regulatory system is the largest in the world and many nations look to it. The IRRS is a useful tool that allows host nations to gain guidance from experienced

  16. Results of a Quality Assurance Review of External Beam Radiation Therapy in the International Society of Paediatric Oncology (Europe) Neuroblastoma Group's High-risk Neuroblastoma Trial: A SIOPEN Study

    Energy Technology Data Exchange (ETDEWEB)

    Gaze, Mark N., E-mail: mark.gaze@uclh.nhs.uk [Department of Oncology, University College London Hospitals NHS Foundation Trust, London (United Kingdom); Boterberg, Tom [Department of Radiation Oncology, Ghent University Hospital, Ghent (Belgium); Dieckmann, Karin; Hoermann, Marcus [General Hospital Vienna, Medical University Vienna (Austria); Gains, Jennifer E.; Sullivan, Kevin P. [Department of Oncology, University College London Hospitals NHS Foundation Trust, London (United Kingdom); Ladenstein, Ruth [Children' s Cancer Research Institute, St. Anna Children' s Hospital, Vienna (Austria)

    2013-01-01

    Purpose: Radiation therapy is important for local control in neuroblastoma. This study reviewed the compliance of plans with the radiation therapy guidelines of the International Society of Paediatric Oncology (Europe) Neuroblastoma Group (SIOPEN) High-Risk Trial protocol. Methods and Materials: The SIOPEN trial central electronic database has sections to record diagnostic imaging and radiation therapy planning data. Individual centers may upload data remotely, but not all centers involved in the trial chose to use this system. A quality scoring system was devised based on how well the radiation therapy plan matched the protocol guidelines, to what extent deviations were justified, and whether adverse effects may result. Central review of radiation therapy planning was undertaken retrospectively in 100 patients for whom complete diagnostic and treatment sets were available. Data were reviewed and compared against protocol guidelines by an international team of radiation oncologists and radiologists. For each patient in the sample, the central review team assigned a quality assurance score. Results: It was found that in 48% of patients there was full compliance with protocol requirements. In 29%, there were deviations for justifiable reasons with no likely long-term adverse effects resulting. In 5%, deviations had occurred for justifiable reasons, but that might result in adverse effects. In 1%, there was a deviation with no discernible justification, which would not lead to long-term adverse events. In 17%, unjustified deviations were noted, with a risk of an adverse outcome resulting. Conclusions: Owing to concern over the proportion of patients in whom unjustified deviations were observed, a protocol amendment has been issued. This offers the opportunity for central review of radiation therapy plans before the start of treatment and the treating clinician a chance to modify plans.

  17. Creativity and Creative Teams

    Science.gov (United States)

    Wood, Richard M.; Bauer, Steven X. S.; Hunter, Craig A.

    2001-01-01

    A review of the linkage between knowledge, creativity, and design is presented and related to the best practices of multidisciplinary design teams. The discussion related to design and design teams is presented in the context of both the complete aerodynamic design community and specifically the work environment at the NASA Langley Research Center. To explore ways to introduce knowledge and creativity into the research and design environment at NASA Langley Research Center a creative design activity was executed within the context of a national product development activity. The success of the creative design team activity gave rise to a need to communicate the experience in a straightforward and managed approach. As a result the concept of creative potential its formulated and assessed with a survey of a small portion of the aeronautics research staff at NASA Langley Research Center. The final section of the paper provides recommendations for future creative organizations and work environments.

  18. Waste management assessment and technical review programme. WATRP. An international peer review service for radioactive waste management activities

    International Nuclear Information System (INIS)

    1994-09-01

    International Atomic Energy Agency provides international peer review services in radioactive waste management to those Member States that have established radioactive waste management programmes. Such services are provided within Waste Management Assessment and Technical Review Programme (WATRP). The main objective of WATRP is to provide international expertise and information on a requested subject in the field of radioactive waste management and to validate that programmes and activities are sound and performing well. Refs, figs and tabs

  19. Advancing the Science of Team Science

    Science.gov (United States)

    Falk‐Krzesinski, Holly J.; Börner, Katy; Contractor, Noshir; Fiore, Stephen M.; Hall, Kara L.; Keyton, Joann; Spring, Bonnie; Stokols, Daniel; Trochim, William; Uzzi, Brian

    2010-01-01

    Abstract The First Annual International Science of Team Science (SciTS) Conference was held in Chicago, IL April 22–24, 2010. This article presents a summary of the Conference proceedings. Clin Trans Sci 2010; Volume 3: 263–266. PMID:20973925

  20. Lessons Learned from PISA: A Systematic Review of Peer-Reviewed Articles on the Programme for International Student Assessment

    Science.gov (United States)

    Hopfenbeck, Therese N.; Lenkeit, Jenny; El Masri, Yasmine; Cantrell, Kate; Ryan, Jeanne; Baird, Jo-Anne

    2018-01-01

    International large-scale assessments are on the rise, with the Programme for International Student Assessment (PISA) seen by many as having strategic prominence in education policy debates. The present article reviews PISA-related English-language peer-reviewed articles from the programme's first cycle in 2000 to its most current in 2015. Five…

  1. The Interdisciplinary Geriatric/Gerontological Team in the Academic Setting.

    Science.gov (United States)

    Mellor, M Joanna; Solomon, Renee

    1992-01-01

    Geriatric health care requires the services of an interdisciplinary health care team to assess, treat and order the social service needs of the older person, and this concept needs to be included in geriatric social work education. But while the necessity of interdisciplinary team care is recognized, little focus has been placed on the actual process of developing a functional team. The issues that arise-disparate terminologies, organizational and administrative differentials, turf-and the steps needed for a team to become viable are described, using an interdisciplinary team based in academia as a case model. The academic interdisciplinary team may easily become a forum for 'hot air' rather than a catalyst for good practice. This danger is reviewed with reference to stages in the interdisciplinary team development-- goal development group affiliation; team awareness; and goal evaluation. The chapter concludes with a discussion on the impact of the interdisciplinary team on faculty, students and the academic setting.

  2. Report of the technical review team on the Catalytic Extraction Process

    International Nuclear Information System (INIS)

    1996-03-01

    The TRT was impressed with the quality and volume of laboratory and pilot scale development work that had been conducted over the past year. Many of the doubts and questions raised by the TRP on technical details had been examined, either by theoretical calculations or in the pilot facility. Moreover, a more open and forthcoming attitude was evident among the MMT staff who either presented briefings or responded to the Team's questions. Of special note to DOE, the TRP recognized a year ago that the pilot facility at Fall River was not designed for radioactive pilot tests. However, from the dialogue surrounding the TRP review, it was evident that not much thought had been given to the hazards, concerns, and special requirements incumbent with radioactive operations -- everything from doing pours of hot radioactive metal from a vessel to remote-handling equipment and operations. This year the TRT noticed a significant improvement in this respect

  3. Team-training in healthcare: a narrative synthesis of the literature

    Science.gov (United States)

    Weaver, Sallie J; Dy, Sydney M; Rosen, Michael A

    2014-01-01

    Background Patients are safer and receive higher quality care when providers work as a highly effective team. Investment in optimising healthcare teamwork has swelled in the last 10 years. Consequently, evidence regarding the effectiveness for these interventions has also grown rapidly. We provide an updated review concerning the current state of team-training science and practice in acute care settings. Methods A PubMed search for review articles examining team-training interventions in acute care settings published between 2000 and 2012 was conducted. Following identification of relevant reviews with searches terminating in 2008 and 2010, PubMed and PSNet were searched for additional primary studies published in 2011 and 2012. Primary outcomes included patient outcomes and quality indices. Secondary outcomes included teamwork behaviours, knowledge and attitudes. Results Both simulation and classroom-based team-training interventions can improve teamwork processes (eg, communication, coordination and cooperation), and implementation has been associated with improvements in patient safety outcomes. Thirteen studies published between 2011 and 2012 reported statistically significant changes in teamwork behaviours, processes or emergent states and 10 reported significant improvement in clinical care processes or patient outcomes, including mortality and morbidity. Effects were reported across a range of clinical contexts. Larger effect sizes were reported for bundled team-training interventions that included tools and organisational changes to support sustainment and transfer of teamwork competencies into daily practice. Conclusions Overall, moderate-to-high-quality evidence suggests team-training can positively impact healthcare team processes and patient outcomes. Additionally, toolkits are available to support intervention development and implementation. Evidence suggests bundled team-training interventions and implementation strategies that embed effective

  4. Use of integrated technology in team sports: a review of opportunities, challenges, and future directions for athletes.

    Science.gov (United States)

    Dellaserra, Carla L; Gao, Yong; Ransdell, Lynda

    2014-02-01

    Integrated technology (IT), which includes accelerometers, global positioning systems (GPSs), and heart rate monitors, has been used frequently in public health. More recently, IT data have been used in sports settings to assess training and performance demands. However, the impact of IT in sports settings is yet to be evaluated, particularly in field-based team sports. This narrative-qualitative review provides an overview of the emerging impact of IT in sports settings. Twenty electronic databases (e.g., Medline, SPORTdiscus, and ScienceDirect), print publications (e.g., Signal Processing Magazine and Catapult Innovations news releases), and internet resources were searched using different combinations of keywords as follows: accelerometers, heart rate monitors, GPS, sport training, and field-based sports for relevant articles published from 1990 to the present. A total of 114 publications were identified, and 39 that examined a field-based team sport using a form of IT were analyzed. The articles chosen for analysis examined a field-based team sport using a form of IT. The uses of IT can be divided into 4 categories: (a) quantifying movement patterns (n = 22), (b) assessing the differences between demands of training and competition (n = 12), (c) measuring physiological and metabolic responses (n = 16), and (d) determining a valid definition for velocity and a sprint effort (n = 8). Most studies used elite adult male athletes as participants and analyzed the sports of Australian Rules football, field hockey, cricket, and soccer, with sample sizes between 5 and 20 participants. The limitations of IT in a sports setting include scalability issues, cost, and the inability to receive signals within indoor environments. Integrated technology can contribute to significant improvements in the preparation, training, and recovery aspects of field-based team sports. Future research should focus on using IT with female athlete populations and developing resources to use IT

  5. Review of research in internal-wave and internal-tide deposits of China: Discussion

    Directory of Open Access Journals (Sweden)

    G. Shanmugam

    2014-10-01

    Full Text Available This discussion of a review article by [27], published in the Journal of Palaeogeography (2(1: 56– 65, is aimed at illustrating that interpretations of ten ancient examples in China and one in the central Appalachians (USA as deep-water deposits of internal waves and internal tides are unsustainable. This critical assessment is based on an in-depth evaluation of oceanographic and sedimentologic data on internal waves and internal tides derived from 332 print and online published works during 1838–January 2013, which include empirical data on the physical characteristics of modern internal waves and internal tides from 51 regions of the world’s oceans [108]. In addition, core and outcrop descriptions of deep-water strata from 35 case studies worldwide carried out by the author during 1974–2011, and a selected number of case studies published by other researchers are evaluated for identifying the sedimentological challenges associated with distinguishing types of bottom-current reworked sands in the ancient sedimentary record. The emerging conclusion is that any interpretation of ancient strata as deposits of internal waves and internal tides is premature.

  6. Better team management--better team care?

    Science.gov (United States)

    Shelley, P; Powney, B

    1994-01-01

    Team building should not be a 'bolt-on' extra, it should be a well planned, integrated part of developing teams and assisting their leaders. When asked to facilitate team building by a group of NHS managers we developed a framework which enabled individual members of staff to become more effective in the way they communicated with each other, their teams and in turn within the organization. Facing the challenge posed by complex organizational changes, staff were able to use 3 training days to increase and develop their awareness of the principles of teamwork, better team management, and how a process of leadership and team building could help yield better patient care.

  7. Team responsibility structure and team performance

    NARCIS (Netherlands)

    Doorewaard, J.A.C.M.; Hootegem, G. van; Huys, R.

    2002-01-01

    The purpose is to analyse the impact of team responsibility (the division of job regulation tasks between team leader and team members) on team performance. It bases an analysis on 36 case studies in The Netherlands which are known to have implemented team‐based work. The case studies were executed

  8. Simulation-based education for building clinical teams

    Directory of Open Access Journals (Sweden)

    Marshall Stuart

    2010-01-01

    Full Text Available Failure to work as an effective team is commonly cited as a cause of adverse events and errors in emergency medicine. Until recently, individual knowledge and skills in managing emergencies were taught, without reference to the additional skills required to work as part of a team. Team training courses are now becoming commonplace, however their strategies and modes of delivery are varied. Just as different delivery methods of traditional education can result in different levels of retention and transfer to the real world, the same is true in team training of the material in different ways in traditional forms of education may lead to different levels of retention and transfer to the real world, the same is true in team training. As team training becomes more widespread, the effectiveness of different modes of delivery including the role of simulation-based education needs to be clearly understood. This review examines the basis of team working in emergency medicine, and the components of an effective emergency medical team. Lessons from other domains with more experience in team training are discussed, as well as the variations from these settings that can be observed in medical contexts. Methods and strategies for team training are listed, and experiences in other health care settings as well as emergency medicine are assessed. Finally, best practice guidelines for the development of team training programs in emergency medicine are presented.

  9. Are self-directed work teams successful and effective tools for today`s organization?

    Energy Technology Data Exchange (ETDEWEB)

    Arnwine, A.D.

    1995-03-01

    The purpose of this research is to (1) show the effectiveness and success of self-directed work teams within the organization, (2) emphasize the importance of team building in the success of the team, and (3) assist organizations in building self-directed work teams. The researcher used a direct survey and studied the following team building techniques: (1) Is the team`s mission clearly defined to each team member? (2) Are the goals clearly defined and achievable by all team members? (3) Will empowerment (decision-making power) be given equally to all team members? (4) Will open and honest communication be allowed among team members? (5) Will each team member be respected and valued for his/her position on the team? (6) Are self-directed work teams effectively rewarded for accomplishments? (7) Have team members received adequate training to effectively complete their job tasks? Upon completion of the literature review and statistical data, and after analyzing the seven areas of team building techniques, it was determined three of the four teams were successful and effective. The only area of concern to the organization is that the participants felt they did not have true ownership of their teams; that is, team members were not given full empowerment. According to this study and the review of literature, full empowerment must be given to achieve successful and effective teams. If true empowerment is not given, the team will suffer in other areas of team building, and the organization will lose a valuable tool.

  10. Utility and assessment of non-technical skills for rapid response systems and medical emergency teams.

    Science.gov (United States)

    Chalwin, R P; Flabouris, A

    2013-09-01

    Efforts are ongoing to improve outcomes from cardiac arrest and medical emergencies. A promising quality improvement modality is use of non-technical skills (NTS) that aim to address human factors through improvements in performance of leadership, communication, situational awareness and decision-making. Originating in the airline industry, NTS training has been successfully introduced into anaesthesia, surgery, emergency medicine and other acute medical specialities. Some aspects of NTS have already achieved acceptance for cardiac arrest teams. Leadership skills are emphasised in advanced life support training and have shown favourable results when employed in simulated and clinical resuscitation scenarios. The application of NTS in medical emergency teams as part of a rapid response system attending medical emergencies is less certain; however, observations of simulations have also shown promise. This review highlights the potential benefits of NTS competency for cardiac arrest teams and, more importantly, medical emergency teams because of the diversity of clinical scenarios encountered. Discussion covers methods to assess and refine NTS and NTS training to optimise performance in the clinical environment. Increasing attention should be applied to yielding meaningful patient and organisational outcomes from use of NTS. Similarly, implementation of any training course should receive appropriate scrutiny to refine team and institutional performance. © 2013 The Authors; Internal Medicine Journal © 2013 Royal Australasian College of Physicians.

  11. Effect of obstetric team training on team performance and medical technical skills: a randomised controlled trial.

    Science.gov (United States)

    Fransen, A F; van de Ven, J; Merién, A E R; de Wit-Zuurendonk, L D; Houterman, S; Mol, B W; Oei, S G

    2012-10-01

    To determine whether obstetric team training in a medical simulation centre improves the team performance and utilisation of appropriate medical technical skills of healthcare professionals. Cluster randomised controlled trial. The Netherlands. The obstetric departments of 24 Dutch hospitals. The obstetric departments were randomly assigned to a 1-day session of multiprofessional team training in a medical simulation centre or to no such training. Team training was given with high-fidelity mannequins by an obstetrician and a communication expert. More than 6 months following training, two unannounced simulated scenarios were carried out in the delivery rooms of all 24 obstetric departments. The scenarios, comprising a case of shoulder dystocia and a case of amniotic fluid embolism, were videotaped. The team performance and utilisation of appropriate medical skills were evaluated by two independent experts. Team performance evaluated with the validated Clinical Teamwork Scale (CTS) and the employment of two specific obstetric procedures for the two clinical scenarios in the simulation (delivery of the baby with shoulder dystocia in the maternal all-fours position and conducting a perimortem caesarean section within 5 minutes for the scenario of amniotic fluid embolism). Seventy-four obstetric teams from 12 hospitals in the intervention group underwent teamwork training between November 2009 and July 2010. The teamwork performance in the training group was significantly better in comparison to the nontraining group (median CTS score: 7.5 versus 6.0, respectively; P = 0.014). The use of the predefined obstetric procedures for the two clinical scenarios was also significantly more frequent in the training group compared with the nontraining group (83 versus 46%, respectively; P = 0.009). Team performance and medical technical skills may be significantly improved after multiprofessional obstetric team training in a medical simulation centre. © 2012 The Authors BJOG An

  12. Can hospital audit teams identify case management problems, analyse their causes, identify and implement improvements? A cross-sectional process evaluation of obstetric near-miss case reviews in Benin

    Directory of Open Access Journals (Sweden)

    Borchert Matthias

    2012-10-01

    Full Text Available Abstract Background Obstetric near-miss case reviews are being promoted as a quality assurance intervention suitable for hospitals in low income countries. We introduced such reviews in five district, regional and national hospitals in Benin, West Africa. In a cross-sectional study we analysed the extent to which the hospital audit teams were able to identify case management problems (CMPs, analyse their causes, agree on solutions and put these solutions into practice. Methods We analysed case summaries, women’s interview transcripts and audit minutes produced by the audit teams for 67 meetings concerning one woman with near-miss complications each. We compared the proportion of CMPs identified by an external assessment team to the number found by the audit teams. For the latter, we described the CMP causes identified, solutions proposed and implemented by the audit teams. Results Audit meetings were conducted regularly and were well attended. Audit teams identified half of the 714 CMPs; they were more likely to find managerial ones (71% than the ones relating to treatment (30%. Most identified CMPs were valid. Almost all causes of CMPs were plausible, but often too superficial to be of great value for directing remedial action. Audit teams suggested solutions, most of them promising ones, for 38% of the CMPs they had identified, but recorded their implementation only for a minority (8.5%. Conclusions The importance of following-up and documenting the implementation of solutions should be stressed in future audit interventions. Tools facilitating the follow-up should be made available. Near-miss case reviews hold promise, but their effectiveness to improve the quality of care sustainably and on a large scale still needs to be established.

  13. Team cohesion and team success in sport.

    Science.gov (United States)

    Carron, Albert V; Bray, Steven R; Eys, Mark A

    2002-02-01

    The main aim of this study was to examine the relationship between task cohesiveness and team success in elite teams using composite team estimates of cohesion. A secondary aim was to determine statistically the consistency (i.e. 'groupness') present in team members' perceptions of cohesion. Elite university basketball teams (n = 18) and club soccer teams (n = 9) were assessed for cohesiveness and winning percentages. Measures were recorded towards the end of each team's competitive season. Our results indicate that cohesiveness is a shared perception, thereby providing statistical support for the use of composite team scores. Further analyses indicated a strong relationship between cohesion and success (r = 0.55-0.67). Further research using multi-level statistical techniques is recommended.

  14. The Application of Social Network Analysis to Team Sports

    Science.gov (United States)

    Lusher, Dean; Robins, Garry; Kremer, Peter

    2010-01-01

    This article reviews how current social network analysis might be used to investigate individual and group behavior in sporting teams. Social network analysis methods permit researchers to explore social relations between team members and their individual-level qualities simultaneously. As such, social network analysis can be seen as augmenting…

  15. Heart transplant centers with multidisciplinary team show a higher level of chronic illness management - Findings from the International BRIGHT Study.

    Science.gov (United States)

    Cajita, Maan Isabella; Baumgartner, Eva; Berben, Lut; Denhaerynck, Kris; Helmy, Remon; Schönfeld, Sandra; Berger, Gabriele; Vetter, Christine; Dobbels, Fabienne; Russell, Cynthia L; De Geest, Sabina

    The objectives of this study were to: (1) explore the proportion of HTx centers that have a multidisciplinary team and (2) assess the relationship between multidisciplinarity and the level of chronic illness management (CIM). The International Society for Heart and Lung Transplantation (ISHLT) recommends a multidisciplinary approach in heart transplant (HTx) follow-up care but little is known regarding the proportion of HTx centers that meet this recommendation and the impact on patient care. HTx centers with a multidisciplinary team may offer higher levels of CIM, a care model that has the potential to improve outcomes after HTx. We conducted a secondary analysis of the BRIGHT study, a cross-sectional study in 11 countries. Multidisciplinarity in the 36 HTx centers was assessed through HTx director reports and was defined as having a team that was composed of physician(s), nurse(s), and another healthcare professional (either a social worker, psychiatrist, psychologist, pharmacist, dietician, physical therapist, or occupational therapist). CIM was assessed with the Patient Assessment of Chronic Illness Care (PACIC). Multiple linear regression assessed the relationship between multidisciplinarity and the level of CIM. Twenty-nine (80.6%) of the HTx centers had a multidisciplinary team. Furthermore, multidisciplinarity was significantly associated with higher levels of CIM (β = 5.2, P = 0.042). Majority of the HTx centers follows the ISHLT recommendation for a multidisciplinary approach. Multidisciplinarity was associated with CIM and point toward a structural factor that needs to be in place for moving toward CIM. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. Trauma team activation: Not just for trauma patients

    Directory of Open Access Journals (Sweden)

    Phoenix Vuong

    2017-01-01

    Full Text Available Specialized trauma teams have been shown to improve outcomes in critically injured patients. At our institution, an the American College of Surgeons Committee on trauma level I Trauma center, the trauma team activation (TTA criteria includes both physiologic and anatomic criteria, but any attending physician can activate the trauma team at their discretion outside criteria. As a result, the trauma team has been activated for noninjured patients meeting physiologic criteria secondary to nontraumatic hemorrhage. We present two cases in which the trauma team was activated for noninjured patients in hemorrhagic shock. The utilization of the TTA protocol and subsequent management by the trauma team are reviewed as we believe these were critical factors in the successful recovery of both patients. Beyond the primary improved survival outcomes of severely injured patients, trauma center designation has a “halo effect” that encompasses patients with nontraumatic hemorrhage.

  17. IAEA Completes First Ever Corporate Safety Review, at Czech Republic's CEZ

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: An international team of nuclear safety experts led by the International Atomic Energy Agency (IAEA) today completed a review of corporate safety performance at CEZ a.s., the largest national electricity company in the Czech Republic. For the first time since the Agency launched its Operational Safety Review Team (OSART) missions in 1982, the team addressed corporate aspects of a company in relation to nuclear safety. The team noted a series of good practices and proposed recommendations to strengthen some safety measures. Assembled at the request of the Government of the Czech Republic, the first ''Corporate OSART'' review, which ran from 30 September to 9 October 2013, addressed corporate aspects necessary to ensure the safe operation of the Dukovany and Temelin Nuclear Power Plants (NPPs). The mission included experts from Finland, France, Romania, USA and the IAEA. OSART services aim to improve operational safety at nuclear facilities by objectively assessing safety performance using the IAEA's Safety Standards and proposing recommendations for improvement where appropriate. The missions serve as a channel to exchange information and experience and provide Member States with good practices. A ''Corporate OSART'' is an OSART mission organized to review those centralized functions of the corporate organization of a utility with multiple nuclear plant sites and conventional plant sites that affect all the operational safety aspects of the nuclear power plants of this utility. ''OSART missions are one of the most important tools of the Agency to ensure better and wider implementation of the IAEA Safety Standards,'' said Denis Flory, Deputy Director General in the IAEA Department of Nuclear Safety and Security. ''Since 1982, we have conducted close to 200 safety review missions around the globe; however, this mission is the first of its kind because we focused on the corporate performance that is a necessity for a safe operation of NPPs,'' Flory added

  18. Distributed team cohesion – not an oxymoron. The impact of information and communications technologies on teamness in globally distributed IT projects

    Directory of Open Access Journals (Sweden)

    Olga Stawnicza

    2015-01-01

    Full Text Available Globally distributed IT projects are common practice in today’s globalized world. Typically, project team members’ work on interdependent tasks, with a common goal to be achieved as one team. However, being split between multiple locations impedes communication among team members and hampers the development of trust. Information and communications media enable communication between geographically distributed project team members and help to create and maintain trust within project units. Communication and trust are particularly significant for fostering a feeling of oneness among project team members. Oneness, also referred to as “teamness”, is repeatedly mentioned as one of the challenges facing global project teams. However, prior literature on teamness is very scarce and its importance is underrepresented. This research contributes to the field in two ways. First, the theoretical study based on a systematic literature review examines available evidence of teamness in globally distributed projects. Secondly, an empirical study based on interviews conducted with global project managers fills the current gap in literature on the link between use of ICT and establishing a sense of team unity. This paper draws practitioners’ attention to the importance of striving for teamness in spite of the geographical distance that exists between project team members.

  19. Assessing and evaluating multidisciplinary translational teams: a mixed methods approach.

    Science.gov (United States)

    Wooten, Kevin C; Rose, Robert M; Ostir, Glenn V; Calhoun, William J; Ameredes, Bill T; Brasier, Allan R

    2014-03-01

    A case report illustrates how multidisciplinary translational teams can be assessed using outcome, process, and developmental types of evaluation using a mixed-methods approach. Types of evaluation appropriate for teams are considered in relation to relevant research questions and assessment methods. Logic models are applied to scientific projects and team development to inform choices between methods within a mixed-methods design. Use of an expert panel is reviewed, culminating in consensus ratings of 11 multidisciplinary teams and a final evaluation within a team-type taxonomy. Based on team maturation and scientific progress, teams were designated as (a) early in development, (b) traditional, (c) process focused, or (d) exemplary. Lessons learned from data reduction, use of mixed methods, and use of expert panels are explored.

  20. Team spirit makes the difference: the interactive effects of team work engagement and organizational constraints during a military operation on psychological outcomes afterwards.

    Science.gov (United States)

    Boermans, S M; Kamphuis, W; Delahaij, R; van den Berg, C; Euwema, M C

    2014-12-01

    This article prospectively explores the effects of collective team work engagement and organizational constraints during military deployment on individual-level psychological outcomes afterwards. Participants were 971 Dutch peacekeepers within 93 teams who were deployed between the end of 2008 and beginning of 2010, for an average of 4 months, in the International Security Assistance Force. Surveys were administered 2 months into deployment and 6 months afterwards. Multi-level regression analyses demonstrated that team work engagement during deployment moderated the relation between organizational constraints and post-deployment fatigue symptoms. Team members reported less fatigue symptoms after deployment if they were part of highly engaged teams during deployment, particularly when concerns about organizational constraints during deployment were high. In contrast, low team work engagement was related to more fatigue symptoms, particularly when concerns about organizational constraints were high. Contrary to expectations, no effects for team work engagement or organizational constraints were found for post-traumatic growth. The present study highlights that investing in team work engagement is important for those working in highly demanding jobs. © 2014 John Wiley & Sons, Ltd.

  1. Improving Care Teams' Functioning: Recommendations from Team Science.

    Science.gov (United States)

    Fiscella, Kevin; Mauksch, Larry; Bodenheimer, Thomas; Salas, Eduardo

    2017-07-01

    Team science has been applied to many sectors including health care. Yet there has been relatively little attention paid to the application of team science to developing and sustaining primary care teams. Application of team science to primary care requires adaptation of core team elements to different types of primary care teams. Six elements of teams are particularly relevant to primary care: practice conditions that support or hinder effective teamwork; team cognition, including shared understanding of team goals, roles, and how members will work together as a team; leadership and coaching, including mutual feedback among members that promotes teamwork and moves the team closer to achieving its goals; cooperation supported by an emotionally safe climate that supports expression and resolution of conflict and builds team trust and cohesion; coordination, including adoption of processes that optimize efficient performance of interdependent activities among team members; and communication, particularly regular, recursive team cycles involving planning, action, and debriefing. These six core elements are adapted to three prototypical primary care teams: teamlets, health coaching, and complex care coordination. Implementation of effective team-based models in primary care requires adaptation of core team science elements coupled with relevant, practical training and organizational support, including adequate time to train, plan, and debrief. Training should be based on assessment of needs and tasks and the use of simulations and feedback, and it should extend to live action. Teamlets represent a potential launch point for team development and diffusion of teamwork principles within primary care practices. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  2. Improving work control systems: The core team concept

    International Nuclear Information System (INIS)

    Jorgensen, M.D.; Simpson, W.W.

    1996-01-01

    The improved work control system at the Idaho Chemical Processing Plant minimizes review and approval time, maximizes field work time, and maintains full compliance with applicable requirements. The core team method gives ownership and accountability to knowledgeable individuals, and the teams use sophisticated scheduling techniques to improve information sharing and cost control and to establish accurate roll-up master schedules

  3. Theorizing on entrepreneurial orientation in international business: A synthetic review

    Directory of Open Access Journals (Sweden)

    Vijay Narayanan

    2017-02-01

    Full Text Available Both, entrepreneurship and international business have been topics of interest for academicians, businessmen and policy-makers around the world. Now it is obvious that entrepreneurs also do business internationally. International entrepreneurship is still a new research domain within international business studies and current empirical investigations focus on entrepreneurial orientation while internationalizing. The main objective of the paper is to discuss the concept of the international entrepreneurial orientation, by linking entrepreneurial orientation and internationalisation of the firm. The article is based on in-depth literature review and its critics.

  4. Team locus-of-control composition, leadership structure, information acquisition, and financial performance: A business simulation study

    NARCIS (Netherlands)

    Boone, Christophe; Van Olffen, W; van Witteloostuijn, A

    2005-01-01

    We argue that team information acquisition mediates the effect of the relationship of team locus-of-control composition and leadership structure on team financial performance in a decision-making context. Hypotheses were tested on 44 teams participating in an elaborate and lengthy international

  5. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  6. Innovative team approach to seal the water inflow at Cigar Lake mine

    International Nuclear Information System (INIS)

    King, C.; Steele, R.; Dixon, B.; Spence, J.; Bazin, K.; Dent, A.; Carreiro, J.; Goddard, G.

    2010-01-01

    'Full text:' In a world where underground mining is more commonly deeper than 5,000 ft., and 8,000-10,000 ft is becoming less extraordinary, new techniques and technologies are in demand to reverse the trend of increasing costs per ton mined. So when a company using their own internal engineering, project and operating resources achieve a true technical first, and moves from concept, through research and development, to successful implementation at the pace of regular production, this is an important event. While the technological details of how the inflow into the flooded Cigar Lake Mine was identified and sealed are tantalising, the value lies in reviewing the repeatability of how to achieve this kind of extraordinary result, which raises people-in-team related questions like; how were they led? How did the working environment get created and sustained that allowed the team to operate in a consistently innovative mindset? How did they maintain a pace that relegated research, development and testing to a pace which is common in a regular operating function? How was the risk of these new techniques and technologies evaluated in a timely and effective manner that was considered normal rather than abnormal, and did not retard the pace of the team progress? If repeatable in regular team project and operating environs, then challenging and improving accepted mining methods, practice and technologies could become the norm rather than the exception. (author)

  7. DOE handbook: Integrated safety management systems (ISMS) verification. Team leader's handbook

    International Nuclear Information System (INIS)

    1999-06-01

    The primary purpose of this handbook is to provide guidance to the ISMS verification Team Leader and the verification team in conducting ISMS verifications. The handbook describes methods and approaches for the review of the ISMS documentation (Phase I) and ISMS implementation (Phase II) and provides information useful to the Team Leader in preparing the review plan, selecting and training the team, coordinating the conduct of the verification, and documenting the results. The process and techniques described are based on the results of several pilot ISMS verifications that have been conducted across the DOE complex. A secondary purpose of this handbook is to provide information useful in developing DOE personnel to conduct these reviews. Specifically, this handbook describes methods and approaches to: (1) Develop the scope of the Phase 1 and Phase 2 review processes to be consistent with the history, hazards, and complexity of the site, facility, or activity; (2) Develop procedures for the conduct of the Phase 1 review, validating that the ISMS documentation satisfies the DEAR clause as amplified in DOE Policies 450.4, 450.5, 450.6 and associated guidance and that DOE can effectively execute responsibilities as described in the Functions, Responsibilities, and Authorities Manual (FRAM); (3) Develop procedures for the conduct of the Phase 2 review, validating that the description approved by the Approval Authority, following or concurrent with the Phase 1 review, has been implemented; and (4) Describe a methodology by which the DOE ISMS verification teams will be advised, trained, and/or mentored to conduct subsequent ISMS verifications. The handbook provides proven methods and approaches for verifying that commitments related to the DEAR, the FRAM, and associated amplifying guidance are in place and implemented in nuclear and high risk facilities. This handbook also contains useful guidance to line managers when preparing for a review of ISMS for radiological

  8. East Asian International Students and Psychological Well-Being: A Systematic Review

    Science.gov (United States)

    Li, Jiaqi; Wang, Yanlin; Xiao, Feiya

    2014-01-01

    The present article reports a systematic review of the studies related to psychological well-being among East Asian international students. A total of 18 quantitative studies published in peer-reviewed journals from 2000 to 2011 were reviewed. Our review revealed three major results: (1) a majority of researchers (n = 13, 72.2%) tend to choose…

  9. Rapid Response Team activation for pediatric patients on the acute pain service.

    Science.gov (United States)

    Teets, Maxwell; Tumin, Dmitry; Walia, Hina; Stevens, Jenna; Wrona, Sharon; Martin, David; Bhalla, Tarun; Tobias, Joseph D

    2017-11-01

    Untreated pain or overly aggressive pain management may lead to adverse physiologic consequences and activation of the hospital's Rapid Response Team. This study is a quality improvement initiative that attempts to identify patient demographics and patterns associated with Rapid Response Team consultations for patients on the acute pain service. A retrospective review of all patients on the acute pain service from February 2011 until June 2015 was cross-referenced with inpatients requiring consultation from the Rapid Response Team. Two independent practitioners reviewed electronic medical records to determine which events were likely associated with pain management interventions. Over a 4-year period, 4872 patients were admitted to the acute pain service of whom 135 unique patients required Rapid Response Team consults. There were 159 unique Rapid Response Team activations among 6538 unique acute pain service consults. A subset of 27 pain management-related Rapid Response Team consultations was identified. The largest percentage of patients on the acute pain service were adolescents aged 12-17 (36%). Compared to this age group, the odds of Rapid Response Team activation were higher among infants Team consultations may help to identify patients at risk for clinical decompensation. © 2017 John Wiley & Sons Ltd.

  10. Making Teamwork Work: Team Knowledge for Team Effectiveness.

    Science.gov (United States)

    Guchait, Priyanko; Lei, Puiwa; Tews, Michael J

    2016-01-01

    This study examined the impact of two types of team knowledge on team effectiveness. The study assessed the impact of taskwork knowledge and teamwork knowledge on team satisfaction and performance. A longitudinal study was conducted with 27 service-management teams involving 178 students in a real-life restaurant setting. Teamwork knowledge was found to impact both team outcomes. Furthermore, team learning behavior was found to mediate the relationships between teamwork knowledge and team outcomes. Educators and managers should therefore ensure these types of knowledge are developed in teams along with learning behavior for maximum effectiveness.

  11. An implementation study of the crisis resolution team model in Norway: Are the crisis resolution teams fulfilling their role?

    Directory of Open Access Journals (Sweden)

    Johnson Sonia

    2011-05-01

    Full Text Available Abstract Background The establishment of crisis resolution teams (CRTs is part of the national mental health policy in several Western countries. The purpose of the present study is to describe characteristics of CRTs and their patients, explore the differences between CRTs, and examine whether the CRTs in Norway are organized according to the international CRT model. Methods The study was a naturalistic study of eight CRTs and 680 patients referred to these teams in Norway. Mental health problems were assessed using the Health of the Nation Outcome Scales (HoNOS, Global Assessment of Functioning Scales (GAF and the International Statistical Classification of Diseases and Related Health Problems, 10th Revision (ICD-10. Results None of the CRTs operated 24 hours a day, seven days a week (24/7 availability or had gate-keeping functions for acute wards. The CRTs also treated patients who were not considered for hospital admission. Forty per cent of patients waited more than 24 hours for treatment. Fourteen per cent had psychotic symptoms, and 69% had affective symptoms. There were significant variations between teams in patients' total severity of symptoms and social problems, but no variations between teams with respect to patients' aggressive behaviour, non-accidental self-injury, substance abuse or psychotic symptoms. There was a tendency for teams operating extended hours to treat patients with more severe mental illnesses. Conclusions The CRT model has been implemented in Norway without a rapid response, gate-keeping function and 24/7 availability. These findings indicate that the CRTs do not completely fulfil their intended role in the mental health system.

  12. IAEA Expert Team Concludes Mission to Onagawa NPP

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An IAEA team of international experts today delivered its initial report at the end of a two-week mission to gather information about the effects of the Great East Japan Earthquake on the Onagawa Nuclear Power Station (NPS), saying the plant was 'remarkably undamaged'. Findings from the visual investigation will be added to an IAEA data base being compiled by its International Seismic Safety Centre (ISSC) to provide knowledge for Member States about the impact of external hazards on nuclear power plants. The ISSC data bank makes an important contribution to the IAEA's Action Plan on Nuclear Safety, which was unanimously endorsed by the Agency's Member States following last year's nuclear accident at Fukushima Daiichi NPS. Onagawa, facing the Pacific Ocean on Japan's north-east coast, was the nuclear power plant closest to the epicentre of the 11 March 2011 magnitude 9.0 earthquake that struck Japan and resulted in a devastating tsunami. The plant experienced very high levels of ground shaking - among the strongest of any plant affected by the earthquake - and some flooding from the tsunami that followed, but was able to shut down safely. In its draft report the team said that 'the structural elements of the NPS were remarkably undamaged given the magnitude of ground motion experienced and the duration and size of this great earthquake'. The mission's objective was to observe how structures, systems and components with significance to the safety of the plant responded to the earthquake and heavy shaking. At the damaged Fukushima Daiichi NPS, nearly 120 km south of Onagawa NPS, the effects of the earthquake, tsunami and hydrogen explosions make it impossible to single out the impact of external hazards on safety-related parts of the power station. The Government of Japan and the IAEA therefore agreed to deploy a mission to the three-unit Onagawa NPS. The team's 19 members from six countries, including IAEA staff, held discussions with the operators of the

  13. A Different Kind of Physics Competition-the 12th International Young Physicists Tournament

    Science.gov (United States)

    Haskell, Hugh

    1999-11-01

    This May, five seniors from the North Carolina School of Science and Mathematics and their adult leaders, Hugh Haskell and Chuck Britton, were the first US team to compete in the International Young Physicists Tournament (IYPT), which took place in Vienna, Austria. They challenged and were challenged by eighteen similar teams from sixteen other countries. The IYPT differs from the Physics Olympiad, which is an examination, whereas the Tournament is a debate on the solution of seventeen open-ended problems published in October, on the IYPT website . The five students, Adriane Boyd, Dahl Clark, Mark Blevins, Zach Keane, and Adam Simpkins spent from mid-January until our departure on May 20, preparing their responses to the questions. In Vienna, the team was joined by Ron Edge, of the University of South Carolina, who served as jurist for the tournament. Each team pays for transportation, but once there, the host country bears all other costs. For each event, called a "physics fight," three teams are assigned their roles-reporter, opponent and reviewer. First, the opposing team selects a question. The reporters have twelve minutes to present a report. The opposing team then has five minutes to critique the report. After a rebuttal by the reporter, the reviewers discuss effectiveness of both presentations . Finally, the jurors ask questions and score each team. This year's overall winner was Germany. Taking second was the team from the Republic of Georgia. The US team did not make the semifinal round, but did well enough for a first-time competitor. Will there be another United States Team? This is an open question. Efforts are being made to find a school that can send a team to next year's competition which is scheduled for Budapest, Hungary.

  14. The Effectiveness of Teamwork Training on Teamwork Behaviors and Team Performance: A Systematic Review and Meta-Analysis of Controlled Interventions.

    Science.gov (United States)

    McEwan, Desmond; Ruissen, Geralyn R; Eys, Mark A; Zumbo, Bruno D; Beauchamp, Mark R

    2017-01-01

    The objective of this study was to conduct a systematic review and meta-analysis of teamwork interventions that were carried out with the purpose of improving teamwork and team performance, using controlled experimental designs. A literature search returned 16,849 unique articles. The meta-analysis was ultimately conducted on 51 articles, comprising 72 (k) unique interventions, 194 effect sizes, and 8439 participants, using a random effects model. Positive and significant medium-sized effects were found for teamwork interventions on both teamwork and team performance. Moderator analyses were also conducted, which generally revealed positive and significant effects with respect to several sample, intervention, and measurement characteristics. Implications for effective teamwork interventions as well as considerations for future research are discussed.

  15. Study protocol for a framework analysis using video review to identify latent safety threats: trauma resuscitation using in situ simulation team training (TRUST).

    Science.gov (United States)

    Fan, Mark; Petrosoniak, Andrew; Pinkney, Sonia; Hicks, Christopher; White, Kari; Almeida, Ana Paula Siquiera Silva; Campbell, Douglas; McGowan, Melissa; Gray, Alice; Trbovich, Patricia

    2016-11-07

    Errors in trauma resuscitation are common and have been attributed to breakdowns in the coordination of system elements (eg, tools/technology, physical environment and layout, individual skills/knowledge, team interaction). These breakdowns are triggered by unique circumstances and may go unrecognised by trauma team members or hospital administrators; they can be described as latent safety threats (LSTs). Retrospective approaches to identifying LSTs (ie, after they occur) are likely to be incomplete and prone to bias. To date, prospective studies have not used video review as the primary mechanism to identify any and all LSTs in trauma resuscitation. A series of 12 unannounced in situ simulations (ISS) will be conducted to prospectively identify LSTs at a level 1 Canadian trauma centre (over 800 dedicated trauma team activations annually). 4 scenarios have already been designed as part of this protocol based on 5 recurring themes found in the hospital's mortality and morbidity process. The actual trauma team will be activated to participate in the study. Each simulation will be audio/video recorded from 4 different camera angles and transcribed to conduct a framework analysis. Video reviewers will code the videos deductively based on a priori themes of LSTs identified from the literature, and/or inductively based on the events occurring in the simulation. LSTs will be prioritised to target interventions in future work. Institutional research ethics approval has been acquired (SMH REB #15-046). Results will be published in peer-reviewed journals and presented at relevant conferences. Findings will also be presented to key institutional stakeholders to inform mitigation strategies for improved patient safety. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  16. Mentor experiences of international healthcare students' learning in a clinical environment: A systematic review.

    Science.gov (United States)

    Mikkonen, Kristina; Elo, Satu; Tuomikoski, Anna-Maria; Kääriäinen, Maria

    2016-05-01

    Globalisation has brought new possibilities for international growth in education and professional mobility among healthcare professionals. There has been a noticeable increase of international degree programmes in non-English speaking countries in Europe, creating clinical learning challenges for healthcare students. The aim of this systematic review was to describe mentors' experiences of international healthcare students' learning in a clinical environment. The objective of the review was to identify what influences the success or failure of mentoring international healthcare students when learning in the clinical environment, with the ultimate aim being to promote optimal mentoring practice. A systematic review was conducted according to the guidelines of the Centre for Reviews and Dissemination. Seven electronic databases were used to search for the published results of previous research: CINAHL, Medline Ovid, Scopus, the Web of Science, Academic Search Premiere, Eric, and the Cochrane Library. Search inclusion criteria were planned in the PICOS review format by including peer-reviewed articles published in any language between 2000 and 2014. Five peer-reviewed articles remained after the screening process. The results of the original studies were analysed using a thematic synthesis. The results indicate that a positive intercultural mentor enhanced reciprocal learning by improving the experience of international healthcare students and reducing stress in the clinical environment. Integrating international healthcare students into work with domestic students was seen to be important for reciprocal learning and the avoidance of discrimination. Many healthcare students were found to share similar experiences of mentoring and learning irrespective of their cultural background. However, the role of a positive intercultural mentor was found to make a significant difference for international students: such mentors advocated and mediated cultural differences and

  17. The importance of trust in virtual team knowledge mediation

    DEFF Research Database (Denmark)

    Petersen, Nils Braad

    2012-01-01

    For transnational companies, virtual project teams are a means of overcoming temporal, geographical and organizational boundaries between team members. However, because the level of knowledge communication has been shown to be influenced by trust (e.g. Staples & Webster 2008; Quigley, Tesluk, Locke......, and will examine how the corporate context, consisting of embedded cultures, corporate structures and orgamizational communities of practice (CoP) support relationships, identity, trust and knowledge communication. According to the literature review on virtual teams conducted by Martins, Gilson & Maynard (2004...

  18. Internalization of Western Culture's Thin-Ideal: A Literature Review on Internalization and Individuals with Eating Disorders.

    Science.gov (United States)

    Albertson, Nicole K.

    This paper is a review of literature regarding internalization of Western culture's thin-ideal. The media's portrayal of a thin-ideal associates success and beauty with being thin. Research has shown that exposure to the culture's thin-ideal does not necessarily lead to eating pathology, but those who internalize the standard are more likely to…

  19. ORGANIZATIONAL WORK GROUPS AND WORK TEAMS – APPROACHES AND DIFFERENCES

    Directory of Open Access Journals (Sweden)

    Raluca ZOLTAN

    2015-02-01

    Full Text Available Work groups and work teams represents basic structures of traditional and modern organizations, and during the time they have been intensively researched. However, managers often do not always consider the fundamental differences between groups and teams, which will lead to unrealistic goals and results below expectations. Thus, in the present paper we propose a review of the main researching approaches on groups and teams (psychosocial, socio-technical, and behavioral approach, in the third part of the paper being detailed the fundamental differences between groups and teams in the light of these approaches.

  20. [Review of: S. Okazaki Handbook of research on international advertising

    NARCIS (Netherlands)

    Neijens, P.

    2012-01-01

    In this book review, Peter Neijens considers the Handbook of Research on International Advertising edited by Shintaro Okazki to be a seminal work, with contributions by top scholars from all over the world. It covers a wide range of topics relevant to the field of international advertising, in eight

  1. A Bibliometric Review on Risk Management and Building Information Modeling for International Construction

    OpenAIRE

    Ganbat, Tsenguun; Chong, Heap-Yih; Liao, Pin-Chao; Wu, You-Di

    2018-01-01

    International construction is complicated and involves high risks. However, with the development of technological innovation, Building Information Modeling (BIM) emerged and seems to be able to address certain risks. To understand BIM applications in risk management for international construction, a state-of-the-art review is required. Therefore, this paper aims to identify the research trends and opportunities for risk management in BIM-enabled international construction by reviewing 526 pee...

  2. Imagery Integration Team

    Science.gov (United States)

    Calhoun, Tracy; Melendrez, Dave

    2014-01-01

    The Human Exploration Science Office (KX) provides leadership for NASA's Imagery Integration (Integration 2) Team, an affiliation of experts in the use of engineering-class imagery intended to monitor the performance of launch vehicles and crewed spacecraft in flight. Typical engineering imagery assessments include studying and characterizing the liftoff and ascent debris environments; launch vehicle and propulsion element performance; in-flight activities; and entry, landing, and recovery operations. Integration 2 support has been provided not only for U.S. Government spaceflight (e.g., Space Shuttle, Ares I-X) but also for commercial launch providers, such as Space Exploration Technologies Corporation (SpaceX) and Orbital Sciences Corporation, servicing the International Space Station. The NASA Integration 2 Team is composed of imagery integration specialists from JSC, the Marshall Space Flight Center (MSFC), and the Kennedy Space Center (KSC), who have access to a vast pool of experience and capabilities related to program integration, deployment and management of imagery assets, imagery data management, and photogrammetric analysis. The Integration 2 team is currently providing integration services to commercial demonstration flights, Exploration Flight Test-1 (EFT-1), and the Space Launch System (SLS)-based Exploration Missions (EM)-1 and EM-2. EM-2 will be the first attempt to fly a piloted mission with the Orion spacecraft. The Integration 2 Team provides the customer (both commercial and Government) with access to a wide array of imagery options - ground-based, airborne, seaborne, or vehicle-based - that are available through the Government and commercial vendors. The team guides the customer in assembling the appropriate complement of imagery acquisition assets at the customer's facilities, minimizing costs associated with market research and the risk of purchasing inadequate assets. The NASA Integration 2 capability simplifies the process of securing one

  3. Domestic/family violence death reviews: an international comparison.

    Science.gov (United States)

    Bugeja, Lyndal; Dawson, Myrna; McIntyre, Sara-Jane; Walsh, Carolyn

    2015-04-01

    Domestic/Family Violence Death Reviews (D/FVDRs) have been established in a number of high-income countries since 1990 as a mechanism to inform prevention-focused interventions to reduce domestic/family violence. D/FVDRs differ in their structure, governance, case identification processes and inclusion criteria, review measures, and outputs. Outside of the United States, the extent of heterogeneity across and within countries has not been explored. This study comprised an international comparison of D/FVDRs and their core elements to inform the establishment of D/FVDRs in other developed countries, and potentially low- and middle-income countries where violence is a leading cause of death. Such a review is also a necessary foundation for any future evaluation D/FVDRs. The review identified 71 jurisdictions where a D/FVDRs had been established in the past two decades, 25 of which met the inclusion criteria. All D/FVDRs examined stated a reduction in deaths as a goal of the review process; however, none reported an actual reduction. The focus of the D/FVDRs examined was on intimate partner homicides; however, more recently established D/FVDRs include other familial relationships. Almost one third of the D/FVDRs examined reported changes to the domestic/family system that occurred as a result of recommendations made from the review process. While similar in many ways, D/FVDRs differ along a number of important dimensions that make it difficult to identify best practices for jurisdictions considering the establishment of such an initiative. To share knowledge, existing networks should be expanded nationally and internationally to include jurisdictions that may be considering this initiative. © The Author(s) 2013.

  4. Sexual abuse of children in residential care : an international review

    NARCIS (Netherlands)

    Timmerman, Margaretha; Schreuder, Pauline

    2014-01-01

    This paper reports the results of an international review of academic literature on sexual abuse in residential child and youth care, 1945-2011. The review focusses on questions related to the nature and scope of sexual abuse, on personal and institutional factors providing either protection or

  5. The Regional Environmental Emergency Team (REET)

    International Nuclear Information System (INIS)

    Maddock, M.

    2001-01-01

    This paper outlined the approach taken in Ontario to set up the Regional Environmental Emergency Team (REET) teams and the progress made in developing partnerships and coordination in response to environmental emergencies in Ontario. Environment Canada has been involved with the Ontario Regional Environmental Emergency Team (REET) Program for the past decade in order to review emergency response roles and responsibilities. REET is designed to enhance communication between emergency response agencies, foster recognition of the various responsibilities involved in an environmental emergency response and to increase the basic understanding of emergency response techniques and procedures within the emergency response community. During emergency response situations REET operates as a flexible and expandable multi-disciplinary and multi-agency team that provides comprehensive and coordinated environmental advice, information and assistance. The Ontario REET program currently consists of 18 area teams throughout the province with informal partnerships with Environment Canada, the Canadian Coast Guard, the Ontario Ministry of the Environment, Emergency Measures Ontario and the Ontario Ministry of Natural Resources. The program was inspired in 1970 and continues to provide an appropriate forum for environmental emergency planning and response. 6 refs., 1 fig

  6. Empirical research on international environmental migration: a systematic review.

    Science.gov (United States)

    Obokata, Reiko; Veronis, Luisa; McLeman, Robert

    2014-01-01

    This paper presents the findings of a systematic review of scholarly publications that report empirical findings from studies of environmentally-related international migration. There exists a small, but growing accumulation of empirical studies that consider environmentally-linked migration that spans international borders. These studies provide useful evidence for scholars and policymakers in understanding how environmental factors interact with political, economic and social factors to influence migration behavior and outcomes that are specific to international movements of people, in highlighting promising future research directions, and in raising important considerations for international policymaking. Our review identifies countries of migrant origin and destination that have so far been the subject of empirical research, the environmental factors believed to have influenced these migrations, the interactions of environmental and non-environmental factors as well as the role of context in influencing migration behavior, and the types of methods used by researchers. In reporting our findings, we identify the strengths and challenges associated with the main empirical approaches, highlight significant gaps and future opportunities for empirical work, and contribute to advancing understanding of environmental influences on international migration more generally. Specifically, we propose an exploratory framework to take into account the role of context in shaping environmental migration across borders, including the dynamic and complex interactions between environmental and non-environmental factors at a range of scales.

  7. Annotated Bibliography and State-of-the-Art Review of the Field of Team Training as it Relates to Military Teams

    Science.gov (United States)

    1986-02-01

    identified general skills required by small-unit leaders which affect the team process: management , communication, problem-solving, tactical, and...skills such as ccoperation, simulation fidelity, feedback/ knowlede of results, and team structur- qr n c.position were categorized in this two...identified: management skills, communication skills, problem solving skills, tactical skills, and teehnical skills. A more detailed description of these

  8. Book Review: Is Fair Value Fair? Financial Reporting from an International Perspective

    DEFF Research Database (Denmark)

    Thinggaard, Frank

    2005-01-01

    This is a review of Henk Langendijk, Dirk Swagerman and Willem Verhoog (Eds) "Is Fair Value Fair? Financial Reporting from an International Perspective," Chichester: John Wiley, 2003, ISBN 0 470 85028 0.......This is a review of Henk Langendijk, Dirk Swagerman and Willem Verhoog (Eds) "Is Fair Value Fair? Financial Reporting from an International Perspective," Chichester: John Wiley, 2003, ISBN 0 470 85028 0....

  9. IAEA Mission Concludes Peer Review of Viet Nam's Radiation and Nuclear Regulatory Framework

    International Nuclear Information System (INIS)

    2014-01-01

    Senior international nuclear safety and radiation protection experts today concluded a 10-day International Atomic Energy Agency (IAEA) mission to review how Viet Nam's regulatory framework for nuclear and radiation safety has incorporated recommendations and suggestions from an earlier review, conducted in 2009. The Integrated Regulatory Review Service (IRRS) follow-up mission, requested by the Viet Nam Agency for Radiation and Nuclear Safety (VARANS), also reviewed the development of the regulatory safety infrastructure to support Viet Nam's nuclear power programme. The eight-member team comprised senior regulatory experts from Canada, France, Pakistan, Slovenia, United Arab Emirates and the United States of America, as well as three IAEA staff members. The IRRS team said in its preliminary assessment that Viet Nam had made progress since 2009, but that some key recommendations still needed to be addressed. Particular strengths identified by the team included: The commitment of VARANS staff to develop legislation and regulations in the field of nuclear and radiation safety; VARANS' efforts to implement practices that are in line with IAEA Safety Standards and internationally recognized good practices; A willingness to receive feedback regarding the efforts to establish and implement a regulation programme; and Progress made in developing the regulatory framework to support the introduction of nuclear power. The team identified the following areas as high-priority steps to further strengthen radiation and nuclear safety in Viet Nam: The effective independence of the regulatory decision-making process needs to be urgently addressed; Additional resources are needed to regulate existing radiation facilities and activities, as well as the country's research reactor; Efforts to increase the capacity of VARANS to regulate the developing nuclear power programme should continue; The draft Master Plan for the Development of Nuclear Power Infrastructure should be finalized

  10. Openness to language and value diversity fosters multicultural team creativity and performance

    DEFF Research Database (Denmark)

    Lauring, Jakob; Paunova, Minna; Butler, Christina

    2015-01-01

    Multicultural teams are increasingly employed by organizations as a way to achieve international coordination, particularly when creativity and innovation are desired. Unfortunately, studies often fail to demonstrate the purported benefits associated with these teams, reporting difficulties with ...... open to value diversity. We conclude that multicultural teams are in want of a climate that is welcoming to both linguistic and cultural differences and suggest implications for theory and practice....... with communication and social integration, inhibiting creativity and performance. A survey-based study of multicultural academic teams (n = 1085) demonstrates that teams that are open to language diversity are more creative and perform better. We observe that performance is enhanced even further when teams are also...

  11. A Bibliometric Review on Risk Management and Building Information Modeling for International Construction

    Directory of Open Access Journals (Sweden)

    Tsenguun Ganbat

    2018-01-01

    Full Text Available International construction is complicated and involves high risks. However, with the development of technological innovation, Building Information Modeling (BIM emerged and seems to be able to address certain risks. To understand BIM applications in risk management for international construction, a state-of-the-art review is required. Therefore, this paper aims to identify the research trends and opportunities for risk management in BIM-enabled international construction by reviewing 526 peer-reviewed journal articles for the years 2007–2017. Thus five steps of bibliometric analysis were conducted based on the proposed frameworks of BIM risk management in international construction (BIM-RM-INTL. The results show that the popularization of BIM not only attracts all stakeholders’ interests but also brings some risks. For example, financial factors are hard to detect and control through BIM, information loss during transmission stands out, and BIM has no unified standards and regulations for international construction. The research has mapped existing research results and their relationships for future risk management in BIM-enabled international construction.

  12. Construction appraisal team inspection results on welding and nondestructive examination activities

    International Nuclear Information System (INIS)

    Wu, P.C.S.; Shaaban, H.I.

    1987-09-01

    This report summarizes data and findings on deficiencies and discrepancies in welding and nondestructive examination (NDE) activities identified by the US Nuclear Regulatory Commission Construction Appraisal Team (CAT) during its inspection of 11 plants. The CAT reviewed selected welds and NDE packages in its inspection of the following plant areas: piping and pipe supports and/or restraints; modification and installation of reactor internals; electrical installations and electrical supports; instrumentation tubing and supports; heating, ventilation, and air conditioning (HVAC) systems and supports; fabrication and erection of structural steel; fabrication of refueling cavity and spent fuel pool liner; containment liner and containment penetrations; and fire protection systems. The CAT inspected both structural welds and pressure-retaining welds and reviewed welder qualification test records and welding procedure documents for code compliance. The NDE activities that were evaluated included visual examination, magnetic particle examination, liquid penetrant examination, ultrasonic examination, and radiographic examination of welds. 4 refs., 14 figs., 15 tabs

  13. Groups Meet . . . Teams Improve: Building Teams That Learn

    Science.gov (United States)

    Hillier, Janet; Dunn-Jensen, Linda M.

    2013-01-01

    Although most business students participate in team-based projects during undergraduate or graduate course work, the team experience does not always teach team skills or capture the team members' potential: Students complete the task at hand but the explicit process of becoming a team is often not learned. Drawing from organizational learning…

  14. Teams make it work: how team work engagement mediates between social resources and performance in teams.

    Science.gov (United States)

    Torrente, Pedro; Salanova, Marisa; Llorens, Susana; Schaufeli, Wilmar B

    2012-02-01

    In this study we analyze the mediating role of team work engagement between team social resources (i.e., supportive team climate, coordination, teamwork), and team performance (i.e., in-role and extra-role performance) as predicted by the Job Demands-Resources Model. Aggregated data of 533 employees nested within 62 teams and 13 organizations were used, whereas team performance was assessed by supervisor ratings. Structural equation modeling revealed that, as expected, team work engagement plays a mediating role between social resources perceived at the team level and team performance as assessed by the supervisor.

  15. Interview: Mr. Stephen Chee, team leader, UNFPA country support team (CST) for the South Pacific.

    Science.gov (United States)

    1993-09-01

    The UNFPA country support team (CST) for the South Pacific is the action-arm at the regional level of the new Technical Support Services arrangement introduced by the agency. Operational since April 1993, the CST currently covers the following Pacific island countries or territories: the Cook Islands, the Federated States of Micronesia, Fiji, Kiribati, Marshall Islands, Nauru, Niue, Palau, Papua New Guinea, Samoa, Solomon Islands, Tokelau, Tonga, Tuvalu, and Vanuatu. The CST office is located in Suva, Fiji, with the main goal of strengthening national capacity and building self-reliance in the countries of the region. The office in Suva is currently staffed by six highly qualified advisors with extensive experience in the population and related fields; two more advisors are expected to join the Team in early 1994. The Team is well equipped to provide countries and territories of the region with a wide range of technical support services ranging from ad hoc technical advisory services to the conceptualization and development of comprehensive population policies and programs. Services are offered in the areas of basic data collection, processing, and research in population dynamics; population policy formulation, evaluation, and implementation; family planning and maternal-child health; information, education, and communication; women in population and development; and population program management. The team also plays an advocacy role in mainstreaming population concerns into the programs and activities of international, regional, and national organizations. The team leader responds to questions about population problems experienced by the countries served, the scope of UNFPA assistance to country governments in the subregion, the importance of population information in the subregion, and how Asia-Pacific POPIN may help the team and countries served.

  16. Team Learning Beliefs and Behaviours in Response Teams

    Science.gov (United States)

    Boon, Anne; Raes, Elisabeth; Kyndt, Eva; Dochy, Filip

    2013-01-01

    Purpose: Teams, teamwork and team learning have been the subject of many research studies over the last decades. This article aims at investigating and confirming the Team Learning Beliefs and Behaviours (TLB&B) model within a very specific population, i.e. police and firemen teams. Within this context, the paper asks whether the team's…

  17. Personality and community prevention teams: Dimensions of team leader and member personality predicting team functioning.

    Science.gov (United States)

    Feinberg, Mark E; Kim, Ji-Yeon; Greenberg, Mark T

    2008-11-01

    The predictors and correlates of positive functioning among community prevention teams have been examined in a number of research studies; however, the role of personality has been neglected. In this study, we examined whether team member and leader personality dimensions assessed at the time of team formation predicted local prevention team functioning 2.5-3.5 years later. Participants were 159 prevention team members in 14 communities participating in the PROSPER study of prevention program dissemination. Three aspects of personality, aggregated at the team level, were examined as predictors: Openness to Experience, Conscientiousness, and Agreeableness. A series of multivariate regression analyses were performed that accounted for the interdependency of five categories of team functioning. Results showed that average team member Openness was negatively, and Conscientiousness was positively linked to team functioning. The findings have implications for decisions about the level and nature of technical assistance support provided to community prevention teams.

  18. The Effectiveness of Teamwork Training on Teamwork Behaviors and Team Performance: A Systematic Review and Meta-Analysis of Controlled Interventions

    Science.gov (United States)

    McEwan, Desmond; Ruissen, Geralyn R.; Eys, Mark A.; Zumbo, Bruno D.; Beauchamp, Mark R.

    2017-01-01

    The objective of this study was to conduct a systematic review and meta-analysis of teamwork interventions that were carried out with the purpose of improving teamwork and team performance, using controlled experimental designs. A literature search returned 16,849 unique articles. The meta-analysis was ultimately conducted on 51 articles, comprising 72 (k) unique interventions, 194 effect sizes, and 8439 participants, using a random effects model. Positive and significant medium-sized effects were found for teamwork interventions on both teamwork and team performance. Moderator analyses were also conducted, which generally revealed positive and significant effects with respect to several sample, intervention, and measurement characteristics. Implications for effective teamwork interventions as well as considerations for future research are discussed. PMID:28085922

  19. The Effectiveness of Teamwork Training on Teamwork Behaviors and Team Performance: A Systematic Review and Meta-Analysis of Controlled Interventions.

    Directory of Open Access Journals (Sweden)

    Desmond McEwan

    Full Text Available The objective of this study was to conduct a systematic review and meta-analysis of teamwork interventions that were carried out with the purpose of improving teamwork and team performance, using controlled experimental designs. A literature search returned 16,849 unique articles. The meta-analysis was ultimately conducted on 51 articles, comprising 72 (k unique interventions, 194 effect sizes, and 8439 participants, using a random effects model. Positive and significant medium-sized effects were found for teamwork interventions on both teamwork and team performance. Moderator analyses were also conducted, which generally revealed positive and significant effects with respect to several sample, intervention, and measurement characteristics. Implications for effective teamwork interventions as well as considerations for future research are discussed.

  20. Putting the MeaT into TeaM Training: Development, Delivery, and Evaluation of a Surgical Team-Training Workshop.

    Science.gov (United States)

    Seymour, Neal E; Paige, John T; Arora, Sonal; Fernandez, Gladys L; Aggarwal, Rajesh; Tsuda, Shawn T; Powers, Kinga A; Langlois, Gerard; Stefanidis, Dimitrios

    2016-01-01

    Despite importance to patient care, team training is infrequently used in surgical education. To address this, a workshop was developed by the Association for Surgical Education Simulation Committee to teach team training using high-fidelity patient simulators and the American College of Surgeons-Association of Program Directors in Surgery team-training curriculum. Workshops were conducted at 3 national meetings. Participants completed preworkshop and postworkshop questionnaires to define experience, confidence in using simulation, intention to implement, as well as workshop content quality. The course consisted of (A) a didactic review of Preparation, Implementation, and Debriefing and (B) facilitated small group simulation sessions followed by debriefings. Of 78 participants, 51 completed the workshops. Overall, 65% indicated that residents at their institutions used patient simulation, but only 33% used the American College of Surgeons-the Association of Program Directors in Surgery team-training modules. The workshop increased confidence to implement simulation team training (3.4 ± 1.3 vs 4.5 ± 0.9). Quality and importance were rated highly (5.4 ± 00.6, highest score = 6). Preparation for simulation-based team training is possible in this workshop setting, although the effect on actual implementation remains to be determined. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  1. Team knowledge assessment of nursing on international targets patient safety in an intensive care unit

    Directory of Open Access Journals (Sweden)

    Maria Nathália da Silva Souza

    2017-08-01

    Full Text Available Background e Objectives: The quality of hospital care provided to the patient and the safety of their stay at the site triggered discussions around the world after the analysis of epidemiological studies conducted in the USA that concluded the high rate of adverse events in the hospital setting Caused by professional error, with that the theme gained strength and motivated discussions about the care models applied to the patients. Therefore the research was aimed at evaluating the knowledge of the Nursing Team of the Intensive Care Unit sector of a public hospital in Recife-PE on the International Patient Safety Goals. Methods: A cross-sectional study with descriptive quantitative approach was carried out from June to August 2016. Data collection was performed through a semi-structured questionnaire that addressed the social and professional aspects of the respondents. The studied variables: gender, age, professional category and training time. The data were analyzed in epiinfo software version 3.2.2. Results: The sample consisted of 50 professionals, 18% of whom were Nurses and 82% were Nursing technicians. Most respondents scored more than 50% of questions about international patient safety goals and had more than one employment relationship. Conclusion: It was verified that the lack of training, work overload and more of an employment relationship can contribute to a precarious professional assistance. KEYWORDS: Patient Safety. Nursing. Safety Management. Intensive Care Units

  2. Evaluating trauma team performance in a Level I trauma center: Validation of the trauma team communication assessment (TTCA-24).

    Science.gov (United States)

    DeMoor, Stephanie; Abdel-Rehim, Shady; Olmsted, Richard; Myers, John G; Parker-Raley, Jessica

    2017-07-01

    Nontechnical skills (NTS), such as team communication, are well-recognized determinants of trauma team performance and good patient care. Measuring these competencies during trauma resuscitations is essential, yet few valid and reliable tools are available. We aimed to demonstrate that the Trauma Team Communication Assessment (TTCA-24) is a valid and reliable instrument that measures communication effectiveness during activations. Two tools with adequate psychometric strength (Trauma Nontechnical Skills Scale [T-NOTECHS], Team Emergency Assessment Measure [TEAM]) were identified during a systematic review of medical literature and compared with TTCA-24. Three coders used each tool to evaluate 35 stable and 35 unstable patient activations (defined according to Advanced Trauma Life Support criteria). Interrater reliability was calculated between coders using the intraclass correlation coefficient. Spearman rank correlation coefficient was used to establish concurrent validity between TTCA-24 and the other two validated tools. Coders achieved an intraclass correlation coefficient of 0.87 for stable patient activations and 0.78 for unstable activations scoring excellent on the interrater agreement guidelines. The median score for each assessment showed good team communication for all 70 videos (TEAM, 39.8 of 54; T-NOTECHS, 17.4 of 25; and TTCA-24, 87.4 of 96). A significant correlation between TTTC-24 and T-NOTECHS was revealed (p = 0.029), but no significant correlation between TTCA-24 and TEAM (p = 0.77). Team communication was rated slightly better across all assessments for stable versus unstable patient activations, but not statistically significant. TTCA-24 correlated with T-NOTECHS, an instrument measuring nontechnical skills for trauma teams, but not TEAM, a tool that assesses communication in generic emergency settings. TTCA-24 is a reliable and valid assessment that can be a useful adjunct when evaluating interpersonal and team communication during trauma

  3. Building a team through a strategic planning process.

    Science.gov (United States)

    Albert, Debra; Priganc, Dave

    2014-01-01

    Strategic planning is a process often left to senior hospital leadership, with limited input from unit-level, bedside patient care providers. This frequent approach to strategic planning misses the opportunity to engage a wide range of employees, build a shared sense of commitment, produce a collaborative team environment, and to generate greater acceptance of the plan. The Patient Care Services division at the University of Chicago Medicine used a strategic planning process that incorporated 360-degree input from both within the Patient Care Services division and outside of the division. The result is a strategic vision and plan that, shaped by broad-based input from both internal and external constituencies, is strengthened by the team that emerged from the process. Through the process of identifying a common understanding of the group's future direction, a shared purpose was created that transcended traditional professional boundaries and shaped a cohesive team focused on effective and efficient patient care. Now, with a focused strategic plan and a team centered on a shared purpose, the team is beginning to effectively deliver on the plan.

  4. Consequences of team charter quality: Teamwork mental model similarity and team viability in engineering design student teams

    Science.gov (United States)

    Conway Hughston, Veronica

    Since 1996 ABET has mandated that undergraduate engineering degree granting institutions focus on learning outcomes such as professional skills (i.e. solving unstructured problems and working in teams). As a result, engineering curricula were restructured to include team based learning---including team charters. Team charters were diffused into engineering education as one of many instructional activities to meet the ABET accreditation mandates. However, the implementation and execution of team charters into engineering team based classes has been inconsistent and accepted without empirical evidence of the consequences. The purpose of the current study was to investigate team effectiveness, operationalized as team viability, as an outcome of team charter implementation in an undergraduate engineering team based design course. Two research questions were the focus of the study: a) What is the relationship between team charter quality and viability in engineering student teams, and b) What is the relationship among team charter quality, teamwork mental model similarity, and viability in engineering student teams? Thirty-eight intact teams, 23 treatment and 15 comparison, participated in the investigation. Treatment teams attended a team charter lecture, and completed a team charter homework assignment. Each team charter was assessed and assigned a quality score. Comparison teams did not join the lecture, and were not asked to create a team charter. All teams completed each data collection phase: a) similarity rating pretest; b) similarity posttest; and c) team viability survey. Findings indicate that team viability was higher in teams that attended the lecture and completed the charter assignment. Teams with higher quality team charter scores reported higher levels of team viability than teams with lower quality charter scores. Lastly, no evidence was found to support teamwork mental model similarity as a partial mediator of the team charter quality on team viability

  5. Prospective systematic review registration: perspective from the Guidelines International Network (G-I-N).

    Science.gov (United States)

    Van der Wees, Philip; Qaseem, Amir; Kaila, Minna; Ollenschlaeger, Guenter; Rosenfeld, Richard

    2012-02-09

    Clinical practice and public health guidelines are important tools for translating research findings into practice with the aim of assisting health practitioners as well as patients and consumers in health behavior and healthcare decision-making. Numerous programs for guideline development exist around the world, with growing international collaboration to improve their quality. One of the key features in developing trustworthy guidelines is that recommendations should be based on high-quality systematic reviews of the best available evidence. The review process used by guideline developers to identify and grade relevant evidence for developing recommendations should be systematic, transparent and unbiased. In this paper, we provide an overview of current international developments in the field of practice guidelines and methods to develop guidelines, with a specific focus on the role of systematic reviews. The Guidelines International Network (G-I-N) aims to stimulate collaboration between guideline developers and systematic reviewers to optimize the use of available evidence in guideline development and to increase efficiency in the guideline development process. Considering the significant benefit of systematic reviews for the guideline community, the G-I-N Board of Trustees supports the international prospective register of systematic reviews (PROSPERO) initiative. G-I-N also recently launched a Data Extraction Resource (GINDER) to present and share data extracted from individual studies in a standardized template. PROSPERO and GINDER are complementary tools to enhance collaboration between guideline developers and systematic reviewers to allow for alignment of activities and a reduction in duplication of effort.

  6. Team performance measures for abnormal plant operations

    International Nuclear Information System (INIS)

    Montgomery, J.C.; Seaver, D.A.; Holmes, C.W.; Gaddy, C.D.; Toquam, J.L.

    1990-01-01

    In order to work effectively, control room crews need to possess well-developed team skills. Extensive research supports the notion that improved quality and effectiveness are possible when a group works together, rather than as individuals. The Nuclear Regulatory Commission (NRC) has recognized the role of team performance in plant safety and has attempted to evaluate licensee performance as part of audits, inspections, and reviews. However, reliable and valid criteria for team performance have not yet been adequately developed. The purpose of the present research was to develop such reliable and valid measures of team skills. Seven dimensions of team skill performance were developed on the basis of input from NRC operator licensing examiners and from the results of previous research and experience in the area. These dimensions included two-way communications, resource management, inquiry, advocacy, conflict resolution/decision-making, stress management, and team spirit. Several different types of rating formats were developed for use with these dimensions, including a modified Behaviorally Anchored Rating Scale (BARS) format and a Behavioral Frequency format. Following pilot-testing and revision, observer and control room crew ratings of team performance were obtained using 14 control room crews responding to simulator scenarios at a BWR and a PWR reactor. It is concluded, overall, that the Behavioral Frequency ratings appeared quite promising as a measure of team skills but that additional statistical analyses and other follow-up research are needed to refine several of the team skills dimensions and to make the scales fully functional in an applied setting

  7. When teams fail to self-regulate: Predictors and outcomes of team procrastination among debating teams

    NARCIS (Netherlands)

    E.A.J. van Hooft (Edwin); H. van Mierlo (Heleen)

    2018-01-01

    textabstractModels of team development have indicated that teams typically engage in task delay during the first stages of the team's life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The

  8. On teams, teamwork, and team performance: discoveries and developments.

    Science.gov (United States)

    Salas, Eduardo; Cooke, Nancy J; Rosen, Michael A

    2008-06-01

    We highlight some of the key discoveries and developments in the area of team performance over the past 50 years, especially as reflected in the pages of Human Factors. Teams increasingly have become a way of life in many organizations, and research has kept up with the pace. We have characterized progress in the field in terms of eight discoveries and five challenges. Discoveries pertain to the importance of shared cognition, the measurement of shared cognition, advances in team training, the use of synthetic task environments for research, factors influencing team effectiveness, models of team effectiveness, a multidisciplinary perspective, and training and technological interventions designed to improve team effectiveness. Challenges that are faced in the coming decades include an increased emphasis on team cognition; reconfigurable, adaptive teams; multicultural influences; and the need for naturalistic study and better measurement. Work in human factors has contributed significantly to the science and practice of teams, teamwork, and team performance. Future work must keep pace with the increasing use of teams in organizations. The science of teams contributes to team effectiveness in the same way that the science of individual performance contributes to individual effectiveness.

  9. Ambulatory movements, team dynamics and interactions during robot-assisted surgery.

    Science.gov (United States)

    Ahmad, Nabeeha; Hussein, Ahmed A; Cavuoto, Lora; Sharif, Mohamed; Allers, Jenna C; Hinata, Nobuyuki; Ahmad, Basel; Kozlowski, Justen D; Hashmi, Zishan; Bisantz, Ann; Guru, Khurshid A

    2016-07-01

    To analyse ambulatory movements and team dynamics during robot-assisted surgery (RAS), and to investigate whether congestion of the physical space associated with robotic technology led to workflow challenges or predisposed to errors and adverse events. With institutional review board approval, we retrospectively reviewed 10 recorded robot-assisted radical prostatectomies in a single operating room (OR). The OR was divided into eight zones, and all movements were tracked and described in terms of start and end zones, duration, personnel and purpose. Movements were further classified into avoidable (can be eliminated/improved) and unavoidable (necessary for completion of the procedure). The mean operating time was 166 min, of which ambulation constituted 27 min (16%). A total of 2 896 ambulatory movements were identified (mean: 290 ambulatory movements/procedure). Most of the movements were procedure-related (31%), and were performed by the circulating nurse. We identified 11 main pathways in the OR; the heaviest traffic was between the circulating nurse zone, transit zone and supply-1 zone. A total of 50% of ambulatory movements were found to be avoidable. More than half of the movements during RAS can be eliminated with an improved OR setting. More studies are needed to design an evidence-based OR layout that enhances access, workflow and patient safety. © 2016 The Authors BJU International © 2016 BJU International Published by John Wiley & Sons Ltd.

  10. Two national teams train at CERN

    CERN Multimedia

    Alix Marcastel

    2011-01-01

    The Swedish and Czech national orienteering teams trained at CERN on Wednesday, at the invitation of the president of the orienteering club, Lennart Jirdén.   Tove Alexandersson, a junior member if the Swedish team.  Three weeks before she won gold, silver and bronze medals at the Junior World Championship.  The two national teams were training at Aix-les-Bains and were invited to come to CERN by the Laboratory's orienteering club. These top athletes had to find their bearings at CERN in the chilly July rain. CERN has a dynamic orienteering club which earned itself an international reputation by getting actively involved in the orienteering world championships last October, which took place in Geneva and Saint-Cergue and for which it prepared the routes. Having proved its worth on that occasion, the club will be helping to organise the next championships in 2012. CERN Map given to the runners. The triangle marks the starting line, and th...

  11. Children's knowledge of internal anatomy: conceptual orientation and review of research.

    Science.gov (United States)

    Jones, E G; Badger, T A; Moore, I

    1992-08-01

    Children's understanding of health and illness is influenced by their knowledge of internal anatomy and physiological functioning. This article provides a comprehensive review of studies of children's knowledge of internal anatomy, one component of internal body image. Consistencies, controversies, and methodological issues that emerge across the studies are discussed. A conceptual framework for the development of children's internal body image is presented. The framework posits relationships between cognitive development, health status, knowledge of internal body image, and understanding of physiological functioning. Future studies are needed to test and refine the conceptual framework and to develop interventions to facilitate children's internal body image.

  12. Using internal and external reviewers can help to optimise neonatal mortality and morbidity conferences.

    Science.gov (United States)

    Assaad, Michael-Andrew; Janvier, Annie; Lapointe, Anie

    2018-02-01

    This study determined whether there was a difference in the conclusions reached by neonatologists in morbidity and mortality conferences based on their level of involvement in a case. All neonatal deaths occurring between August 2014 and September 2015 at the neonatal intensive care unit of Sainte-Justine Hospital, Montreal, Quebec, Canada, were reviewed by internal physicians involved in the case and external physicians who were not. The reviewers were asked to identify positive and negative clinical practice items and provide written recommendations. These were classified into eight categories and compared for each case. During the study, 55 patients died leading to 110 reviews and a total of 590 positive and negative items. Most items were in the communication (25.2%), ethical decision-making (16.7%) and clinical management (14.8%) categories. Both the internal and external reviewers were in agreement 48.5% of the time for positive items and 44.8% for negative items. There were 242 written recommendations, which differed significantly among the internal and external reviewers. Reviews of neonatal deaths by two independent reviewers, internal physicians and external physicians, led to different positive and negative practice items and recommendations. This could allow for a richer discussion and improve recommendations for patient care. ©2017 Foundation Acta Paediatrica. Published by John Wiley & Sons Ltd.

  13. Enhancing Team Performance for Long-Duration Space Missions

    Science.gov (United States)

    Orasanu, Judith M.

    2009-01-01

    Success of exploration missions will depend on skilled performance by a distributed team that includes both the astronauts in space and Mission Control personnel. Coordinated and collaborative teamwork will be required to cope with challenging complex problems in a hostile environment. While thorough preflight training and procedures will equip creW'S to address technical problems that can be anticipated, preparing them to solve novel problems is much more challenging. This presentation will review components of effective team performance, challenges to effective teamwork, and strategies for ensuring effective team performance. Teamwork skills essential for successful team performance include the behaviors involved in developing shared mental models, team situation awareness, collaborative decision making, adaptive coordination behaviors, effective team communication, and team cohesion. Challenges to teamwork include both chronic and acute stressors. Chronic stressors are associated with the isolated and confined environment and include monotony, noise, temperatures, weightlessness, poor sleep and circadian disruptions. Acute stressors include high workload, time pressure, imminent danger, and specific task-related stressors. Of particular concern are social and organizational stressors that can disrupt individual resilience and effective mission performance. Effective team performance can be developed by training teamwork skills, techniques for coping with team conflict, intracrew and intercrew communication, and working in a multicultural team; leadership and teamwork skills can be fostered through outdoor survival training exercises. The presentation will conclude with an evaluation of the special requirements associated with preparing crews to function autonomously in long-duration missions.

  14. Field Organization and Disaster Medical Assistance Teams

    Directory of Open Access Journals (Sweden)

    Ibrahim ARZIMAN

    2015-10-01

    Full Text Available SUMMARY: Disasters cause an acute deterioration in all stages of life. An area affected by the disaster in which the normal activities of life are disrupted is described as a “Field” in disaster terminology. Although it is not easy to define the borders of this zone, the area where there is normally functioning society is accepted as the boundary. Disaster management is the responsibility of the local government. However, in many large disaster responses many non-governmental and international organizations play a role. A Disaster Medical Team is a trained, mobile, self-contained, self-sufficient, multidisciplinary medical team that can act in the acute phase of a sudden-onset disaster (48 to 72 hours after its occurrence to provide medical treatment in the affected area. The medical team can include physicians, nurses, paramedics and EMTS, technicians, personnel to manage logistics, security and others. Various models of Disaster Medical Teams can be observed around the world. There is paucity of evidence based literature regarding DMTs. There is a need for epidemiological studies with rigorous designs and sampling. In this section of the special edition of the journal, field organizations in health management during disasters will be summarized, with emphasis on preparedness and response phases, and disaster medical teams will be discussed. Keywords: Field organization, disaster, medical team, DMAT

  15. Team reasoning: Solving the puzzle of coordination.

    Science.gov (United States)

    Colman, Andrew M; Gold, Natalie

    2017-11-03

    In many everyday activities, individuals have a common interest in coordinating their actions. Orthodox game theory cannot explain such intuitively obvious forms of coordination as the selection of an outcome that is best for all in a common-interest game. Theories of team reasoning provide a convincing solution by proposing that people are sometimes motivated to maximize the collective payoff of a group and that they adopt a distinctive mode of reasoning from preferences to decisions. This also offers a compelling explanation of cooperation in social dilemmas. A review of team reasoning and related theories suggests how team reasoning could be incorporated into psychological theories of group identification and social value orientation theory to provide a deeper understanding of these phenomena.

  16. Radioactive waste management: International peer reviews

    International Nuclear Information System (INIS)

    Warnecke, E.; Bonne, A.

    1995-01-01

    The Agency's peer review service for radioactive waste management - known as the Waste Management Assessment and Technical Review Programme (WATRP) - started in 1989, building upon earlier types of advisory programmes. WATRP's international experts today provide advice and guidance on proposed or ongoing radioactive waste management programmes; planning, operation, or decommissioning of waste facilities; or on legislative, organizational, and regulatory matters. Specific topics often cover waste conditioning, storage, and disposal concepts or facilities; or technical and other aspects of ongoing or planned research and development programmes. The missions can thus contributed to improving waste management systems and plans, and in raising levels of public confidence in them, as part of IAEA efforts to assist countries in the safe management of radioactive wastes. This article presents a brief overview of recent WATRP missions in Norway, Slovak Republic, Czech Republic and Finland

  17. IAEA Concludes Safety Review at Gravelines Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An IAEA-led international team of nuclear safety experts noted a series of good practices and made recommendations to reinforce some safety measures during a review of operational safety at France's Gravelines Nuclear Power Plant (NPP) that concluded today. The Operational Safety Review Team (OSART) was assembled at the French Government's request. The in-depth review, which began 12 November 2012, focused on aspects essential to the safe operation of the NPP. The team was composed of experts from Bulgaria, China, Germany, Hungary, Japan, Romania, Slovakia, South Africa, Spain, Ukraine and the IAEA. The review covered the areas of management, organization and administration; training and qualification; operations; maintenance; technical support; operating experience; radiation protection; chemistry; emergency planning and preparedness; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their possible use elsewhere. Examples include the following: - The Power Plant uses a staff-skills mapping process that significantly enhances knowledge of the facility's collective and individual skills and provides proactive management to address the loss of such skills; - As a measure to reduce the risk of workers' radiation exposure, the Power Plant uses a system to ensure that dose rate measurements are carried out at a precise distance from the source of radiation; and - Flood protection of the Power Plant is supported by special technical guidance documents and associated arrangements. The team identified a number of proposals for improvements to operational safety at Gravelines NPP. Examples include the following: - The Power Plant should reinforce its measures to prevent foreign objects from entering plant systems; - The Power Plant should ensure the 24-hour presence of an operator

  18. IAEA team to report on Kashiwazaki Kariwa Nuclear Power Plant examination

    International Nuclear Information System (INIS)

    2007-01-01

    Full text: The Kashiwazaki Kariwa Nuclear Power Plant in Japan, affected by a strong earthquake on 16 July, shut down safely and damage appears less than expected, a fact finding mission of international nuclear safety experts has concluded. The six member expert team of the International Atomic Energy Agency was dispatched upon the request of the Japanese authorities. The mission report will be issued within a few days. The Director General of the IAEA, Mohamed ElBaradei, said today that he welcomed the cooperation and transparency the team had received from the Japanese authorities. The mission's findings and the Japanese analyses of the event include important lessons learned - both positive and negative - that will be relevant to other nuclear plants worldwide, he said. The team conducted a three day physical examination covering the complex of seven units, as well as analysis of instrument logs and other records from the time of the event. It has concluded that plant safety features performed as required during the earthquake. The team's review of plant operator records and analyses support the Japanese authorities' conclusion that the very small amount of radioactivity released was well below the authorized limits for public health and environmental safety. Damage from the earthquake appears to be limited to those sections of the plant that would not affect the reactor or systems related to reactor safety. Detailed checks and inspections by the operator and Japanese authorities are ongoing. According to the IAEA team, significant work, such as detailed examination of the reactor vessels, cores and fuel elements, has still to be performed. Physical stresses resulting from the earthquake could affect the long term safe operation of some plant components, the team said. Additional engineering analysis of such components would be an important consideration for future examination, to determine whether they should be replaced earlier than otherwise anticipated. The

  19. Advancing team-based primary health care: a comparative analysis of policies in western Canada.

    Science.gov (United States)

    Suter, Esther; Mallinson, Sara; Misfeldt, Renee; Boakye, Omenaa; Nasmith, Louise; Wong, Sabrina T

    2017-07-17

    We analyzed and compared primary health care (PHC) policies in British Columbia, Alberta and Saskatchewan to understand how they inform the design and implementation of team-based primary health care service delivery. The goal was to develop policy imperatives that can advance team-based PHC in Canada. We conducted comparative case studies (n = 3). The policy analysis included: Context review: We reviewed relevant information (2007 to 2014) from databases and websites. Policy review and comparative analysis: We compared and contrasted publically available PHC policies. Key informant interviews: Key informants (n = 30) validated narratives prepared from the comparative analysis by offering contextual information on potential policy imperatives. Advisory group and roundtable: An expert advisory group guided this work and a key stakeholder roundtable event guided prioritization of policy imperatives. The concept of team-based PHC varies widely across and within the three provinces. We noted policy gaps related to team configuration, leadership, scope of practice, role clarity and financing of team-based care; few policies speak explicitly to monitoring and evaluation of team-based PHC. We prioritized four policy imperatives: (1) alignment of goals and policies at different system levels; (2) investment of resources for system change; (3) compensation models for all members of the team; and (4) accountability through collaborative practice metrics. Policies supporting team-based PHC have been slow to emerge, lacking a systematic and coordinated approach. Greater alignment with specific consideration of financing, reimbursement, implementation mechanisms and performance monitoring could accelerate systemic transformation by removing some well-known barriers to team-based care.

  20. International review on safety requirements for the prototype fast breeder reactor “Monju”

    International Nuclear Information System (INIS)

    2016-01-01

    In response to the lessons learned from the serious nuclear accidents at the TEPCO's Fukushima Daiichi Nuclear Power Stations, an advisory committee, which was set up by the Japan Atomic Energy Agency, issued the report “Safety Requirements Expected to the Prototype Fast Breeder Reactor Monju” taking into account the SFR specific safety characteristics in July 2014. The report was reviewed by the leading international experts on SFR safety from five countries and one international organization in order to obtain independent and objective evaluation. The international review comments on each subsection were collected and compiled, and then a summary of results was derived through the discussion at the review meeting and individual feedbacks. As a result the basic concept for prevention of severe accidents and mitigation of their consequences of Monju is appropriate in consideration of SFR specific safety characteristics, and is in accordance with international common understanding. (author)

  1. Understanding and Modeling Teams As Dynamical Systems

    Science.gov (United States)

    Gorman, Jamie C.; Dunbar, Terri A.; Grimm, David; Gipson, Christina L.

    2017-01-01

    By its very nature, much of teamwork is distributed across, and not stored within, interdependent people working toward a common goal. In this light, we advocate a systems perspective on teamwork that is based on general coordination principles that are not limited to cognitive, motor, and physiological levels of explanation within the individual. In this article, we present a framework for understanding and modeling teams as dynamical systems and review our empirical findings on teams as dynamical systems. We proceed by (a) considering the question of why study teams as dynamical systems, (b) considering the meaning of dynamical systems concepts (attractors; perturbation; synchronization; fractals) in the context of teams, (c) describe empirical studies of team coordination dynamics at the perceptual-motor, cognitive-behavioral, and cognitive-neurophysiological levels of analysis, and (d) consider the theoretical and practical implications of this approach, including new kinds of explanations of human performance and real-time analysis and performance modeling. Throughout our discussion of the topics we consider how to describe teamwork using equations and/or modeling techniques that describe the dynamics. Finally, we consider what dynamical equations and models do and do not tell us about human performance in teams and suggest future research directions in this area. PMID:28744231

  2. The Search for Stability: Provincial Reconstruction Teams in Afghanistan

    National Research Council Canada - National Science Library

    Wardle, Russel

    2004-01-01

    ... and international bodies as well as the military. Provincial Reconstruction Teams (PRTs), as employed in Afghanistan, are used as a vehicle to examine the wide range of activities necessary for Nation Building...

  3. TEAM.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This document presents materials covering the television campaign against drunk driving called "TEAM" (Techniques for Effective Alcohol Management). It is noted that TEAM's purpose is to promote effective alcohol management in public facilities and other establishments that serve alcoholic beverages. TEAM sponsors are listed, including…

  4. Professional Skills in International Financial Surveillance

    DEFF Research Database (Denmark)

    Seabrooke, Leonard; Nilsson, Emelie Rebecca

    2015-01-01

    In 2006, the International Monetary Fund's (IMF) Financial Sector Assessment Program (FSAP) lauded Iceland's capacity to “withstand extreme, but plausible, shocks,” which was clearly an error in judgment. After the international financial crisis hit, IMF officials bemoaned the lack of professional...... use an Optimal Matching analysis of work roles in career histories to identify differences in policy teams and external experts' attributes. The article also draws on interviews with FSAP team members from 2008 to 2013. We demonstrate that changes in professional skills and team composition...

  5. How Diversity Matters in the US Science and Engineering Workforce: A Critical Review Considering Integration in Teams, Fields, and Organizational Contexts

    Directory of Open Access Journals (Sweden)

    Laurel Smith-Doerr

    2017-04-01

    Full Text Available How the race and gender diversity of team members is related to innovative science and technology outcomes is debated in the scholarly literature. Some studies find diversity is linked to creativity and productivity, other studies find that diversity has no effect or even negative effects on team outcomes. Based on a critical review of the literature, this paper explains the seemingly contradictory findings through careful attention to the organizational contexts of team diversity. We distinguish between representational diversity and full integration of minority scientists. Representational diversity, where organizations have workforces that match the pool of degree recipients in relevant fields, is a necessary but not sufficient condition for diversity to yield benefits. Full integration of minority scientists (i.e., including women and people of color in an interaction context that allows for more level information exchange, unimpeded by the asymmetrical power relationships that are common across many scientific organizations, is when the full potential for diversity to have innovative outcomes is realized. Under conditions of equitable and integrated work environments, diversity leads to creativity, innovation, productivity, and positive reputational (status effects. Thus, effective policies for diversity in science and engineering must also address integration in the organizational contexts in which diverse teams are embedded.

  6. SALTO Peer Review Guidelines. Guidelines for Peer Review of Safety Aspects of Long Term Operation of Nuclear Power Plants

    International Nuclear Information System (INIS)

    2014-01-01

    International peer review is a useful tool for Member States to exchange experiences, learn from each other and apply good practices in the long term operation (LTO) of nuclear power plants (NPPs). The peer review is also an important mechanism through which the IAEA supports Member States in enhancing the safety of NPPs. The IAEA has conducted various types of safety review that indirectly address aspects of LTO, including safety reviews for design, engineering, operation and external hazards. Operational Safety Review Team (OSART) services include review of ageing management programmes. In addition, several Member States have requested Ageing Management Assessment Team (AMAT) missions. Through these experiences, it was recognized that a comprehensive peer review on LTO would be very useful to Member States. The Safety Aspects of Long Term Operation (SALTO) peer review addresses strategy and key elements for the safe LTO of NPPs, which includes AMAT objectives and complements OSART reviews. The SALTO peer review is designed to assist operating organizations in adopting a proper approach to LTP including implementing appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review can be tailored to focus on ageing management programmes (AMPs) or on other activities related to LTO to support the Member State in enhancing the safety of its NPPs. The SALTO peer review can also support regulators in establishing or improving regulatory and licensing strategies for the LTO of NPPs. The guidelines in this publication are primarily intended for members of a SALTO review team and provide a basic structure and common reference for peer reviews of LTO. Additionally, the guidelines also provide useful information to the operating organizations of NPPs (or technical support organizations) for carrying out their own self-assessments or comprehensive programme reviews. The guidelines are intended to be generic, as there are

  7. Prospective systematic review registration: perspective from the Guidelines International Network (G-I-N

    Directory of Open Access Journals (Sweden)

    Van der Wees Philip

    2012-02-01

    Full Text Available Abstract Clinical practice and public health guidelines are important tools for translating research findings into practice with the aim of assisting health practitioners as well as patients and consumers in health behavior and healthcare decision-making. Numerous programs for guideline development exist around the world, with growing international collaboration to improve their quality. One of the key features in developing trustworthy guidelines is that recommendations should be based on high-quality systematic reviews of the best available evidence. The review process used by guideline developers to identify and grade relevant evidence for developing recommendations should be systematic, transparent and unbiased. In this paper, we provide an overview of current international developments in the field of practice guidelines and methods to develop guidelines, with a specific focus on the role of systematic reviews. The Guidelines International Network (G-I-N aims to stimulate collaboration between guideline developers and systematic reviewers to optimize the use of available evidence in guideline development and to increase efficiency in the guideline development process. Considering the significant benefit of systematic reviews for the guideline community, the G-I-N Board of Trustees supports the international prospective register of systematic reviews (PROSPERO initiative. G-I-N also recently launched a Data Extraction Resource (GINDER to present and share data extracted from individual studies in a standardized template. PROSPERO and GINDER are complementary tools to enhance collaboration between guideline developers and systematic reviewers to allow for alignment of activities and a reduction in duplication of effort.

  8. Increasing Student-Learning Team Effectiveness with Team Charters

    Science.gov (United States)

    Hunsaker, Phillip; Pavett, Cynthia; Hunsaker, Johanna

    2011-01-01

    Because teams are a ubiquitous part of most organizations today, it is common for business educators to use team assignments to help students experientially learn about course concepts and team process. Unfortunately, students frequently experience a number of problems during team assignments. The authors describe the results of their research and…

  9. Paradoxes in virtual team knowledge communication and trust building

    DEFF Research Database (Denmark)

    Petersen, Nils Braad

    2012-01-01

    This thesis proposal presents paradoxes within current trust and knowledge management literatures as a lens for understanding challenges in virtual teams working across organisational and geographic boundaries. By exposing contradictions within current virtual team research, the author proposes...... a need for a different, multi-level, multi-theoretical approach to virtual team research in order to overcome the paradoxes. A moderate constructionist research position building on Critical Realism is proposed. To situate the project within current literatures, trust, knowledge management and virtual...... team literatures are reviewed. These are used to support the paradoxes used as a lens for understanding. A research design is presented building on interviews, documentary analysis and observations analysed using Social Network Analysis and James Gee’s framework for discourse analysis. Finally...

  10. Effects of team emotional authenticity on virtual team performance

    Directory of Open Access Journals (Sweden)

    Catherine E Connelly

    2016-08-01

    Full Text Available Members of virtual teams lack many of the visual or auditory cues that are usually used as the basis for impressions about fellow team members. We focus on the effects of the impressions formed in this context, and use social exchange theory to understand how these impressions affect team performance. Our pilot study, using content analysis (n = 191 students, suggested that most individuals believe that they can assess others’ emotional authenticity in online settings by focusing on the content and tone of the messages. Our quantitative study examined the effects of these assessments. Structural equation modeling (SEM analysis (n = 81 student teams suggested that team-level trust and teamwork behaviors mediate the relationship between team emotional authenticity and team performance, and illuminate the importance of team emotional authenticity for team processes and outcomes.

  11. IAEA Completes Nuclear Security Review Mission in Hungary

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: A team of International Atomic Energy Agency (IAEA) experts today completed a mission to review nuclear security practices in Hungary. At the request of the Government of Hungary, the IAEA conducted the two-week International Physical Protection Advisory Service (IPPAS) mission that reviewed the nation's nuclear security-related legislative and regulatory framework, physical protection systems at Hungarian nuclear facilities, and security arrangements applied to the transport of nuclear and radioactive materials. The IAEA team was led by Stephen Ortiz of the United States and included nine experts from six nations and the IAEA. The team met in Budapest with officials from the Hungarian Atomic Energy Authority, Hungarian Police Headquarters, National Security Authority and other relevant agencies. They also conducted site visits to the Paks Nuclear Power Plant, the Interim Spent Fuel Storage Facility, the Budapest Research Reactor, the Budapest Training Reactor, the Radioactive Waste Treatment and Disposal Facility and several other locations where high activity radioactive sources are used for different applications. ''At a time where development of a nuclear power programme is more than ever recognised as necessitating a strong commitment to safety, security and sustainability, the example given today by Hungary strengthens the message about the value of applying the IAEA Security Guidance,'' said IAEA Deputy Director General for Nuclear Safety and Security, Denis Flory, who opened the mission. ''Indeed, IPPAS missions, carried out at the appropriate time in the development of a nuclear power programme, provide valuable insights into how best to reach that goal.'' The IPPAS team concluded that nuclear security within Hungary has been significantly enhanced in recent years. The team also identified a number of good practices at the nation's nuclear facilities, and provided some recommendations and suggestions to assist Hungary in the continuing

  12. Impact of communication delays to and from the International Space Station on self-reported individual and team behavior and performance: A mixed-methods study

    Science.gov (United States)

    Kintz, Natalie M.; Chou, Chih-Ping; Vessey, William B.; Leveton, Lauren B.; Palinkas, Lawrence A.

    2016-12-01

    Deep space explorations will involve significant delays in communication to and from Earth that will likely impact individual and team outcomes. However, the extent of these impacts and the appropriate countermeasures for their mitigation remain largely unknown. This study utilized the International Space Station (ISS), a high-fidelity analog for deep space, as a research platform to assess the impact of communication delays on individual and team performance, mood, and behavior. Three astronauts on the ISS and 18 mission support personnel performed tasks with and without communication delays (50-s one-way) during a mission lasting 166 days. Self-reported assessments of individual and team performance and mood were obtained after each task. Secondary outcomes included communication quality and task autonomy. Qualitative data from post-mission interviews with astronauts were used to validate and expand on quantitative data, and to elicit recommendations for countermeasures. Crew well-being and communication quality were significantly reduced in communication delay tasks compared to control. Communication delays were also significantly associated with increased individual stress/frustration. Qualitative data suggest communication delays impacted operational outcomes (i.e. task efficiency), teamwork processes (i.e. team/task coordination) and mood (i.e. stress/frustration), particularly when tasks involved high task-related communication demands, either because of poor communication strategies or low crew autonomy. Training, teamwork, and technology-focused countermeasures were identified to mitigate or prevent adverse impacts.

  13. College of Engineering team to build battlefield robots for 2010 competition

    OpenAIRE

    Mackay, Steven D.

    2010-01-01

    The roving, walking robotic soldiers of the "Terminator" films are becoming less sci-fi, and more certain future every day. Now, a team of robotics researchers from the Virginia Tech College of Engineering will build a team of fully autonomous cooperative battle-ready robots as part of a 2010 international war games challenge that could spur real-life battle bots.

  14. Measuring Team Learning Behaviours through Observing Verbal Team Interaction

    Science.gov (United States)

    Raes, Elisabeth; Boon, Anne; Kyndt, Eva; Dochy, Filip

    2015-01-01

    Purpose: This study aims to explore, as an answer to the observed lack of knowledge about actual team learning behaviours, the characteristics of the actual observed basic team learning behaviours and facilitating team learning behaviours more in-depth of three project teams. Over time, team learning in an organisational context has been…

  15. The Relationship between Management Team Size and Team Performance: The Mediating Effect of Team Psychological Safety

    OpenAIRE

    Midthaug, Mari Bratterud

    2017-01-01

    The purpose of this thesis is to explore the relationship between team size (number of team members) and team performance in management teams. There is a lack of empirical research exploring the potential links between these two elements within management teams. Further, little attention has been paid to potential mechanisms affecting this relationship. In this study, team psychological safety has been examined as a potential mediator in the size-performance relationship, hypothesizing that t...

  16. Wood fuel from early thinning and plantation cleaning. An international review

    International Nuclear Information System (INIS)

    Puttock, D.; Richardsson, J.

    1998-01-01

    Activities 1.2 (Forest management) and 1.2 (Harvesting) of Task XII/IEA Bioenergy Agreement carried out an international review of wood fuel from plantation cleaning and early thinning. The participating countries were Canada, Denmark, Finland, the Netherlands, New Zealand, Sweden and the United Kingdom. The individual country reviews and an international summary are presented in this paper. Each report gives country-related background information on forestry and wood utilization, energy potential from plantation cleaning and early thinning, environmental considerations from the viewpoint of wood fuel recovery, silvicultural systems and methods, cost of wood fuel, and knowledge gaps and problems

  17. Behavioral Design Teams: The Next Frontier in Clinical Delivery Innovation?

    Science.gov (United States)

    Robertson, Ted; Darling, Matthew; Leifer, Jennifer; Footer, Owen; Gordski, Dani

    2017-11-01

    A deep understanding of human behavior is critical to designing effective health care delivery models, tools, and processes. Currently, however, few mechanisms exist to systematically apply insights about human behavior to improve health outcomes. Behavioral design teams (BDTs) are a successful model for applying behavioral insights within an organization. Already operational within government, this model can be adapted to function in a health care setting. To explore how BDTs could be applied to clinical care delivery and review models for integrating these teams within health care organizations. Interviews with experts in clinical delivery innovation and applied behavioral science, as well as leaders of existing government BDTs. BDTs are most effective when they enjoy top-level executive support, are co-led by a domain expert and behavioral scientist, collaborate closely with key staff and departments, have access to data and IT support, and operate a portfolio of projects. BDTs could be embedded in health care organizations in multiple ways, including in or just below the CEO’s office, within a quality improvement unit, or within an internal innovation center. When running a portfolio, BDTs achieve a greater number and diversity of insights at lower costs. They also become a platform for strategic learning and scaling.

  18. Leading Teams of Leaders: What Helps Team Member Learning?

    Science.gov (United States)

    Higgins, Monica; Young, Lissa; Weiner, Jennie; Wlodarczyk, Steven

    2010-01-01

    School districts are moving toward a new form of management in which superintendents need to form and nurture leadership teams. A study of 25 such teams in Connecticut suggests that a team's effectiveness is maximized when the team members are coached by other team members, not the superintendent, and when they are coached on task-related…

  19. Effective International Medical Disaster Relief: A Qualitative Descriptive Study.

    Science.gov (United States)

    Broby, Nicolette; Lassetter, Jane H; Williams, Mary; Winters, Blaine A

    2018-04-01

    Purpose The aim of this study was to assist organizations seeking to develop or improve their medical disaster relief effort by identifying fundamental elements and processes that permeate high-quality, international, medical disaster relief organizations and the teams they deploy. A qualitative descriptive design was used. Data were gathered from interviews with key personnel at five international medical response organizations, as well as during field observations conducted at multiple sites in Jordan and Greece, including three refugee camps. Data were then reviewed by the research team and coded to identify patterns, categories, and themes. The results from this qualitative, descriptive design identified three themes which were key characteristics of success found in effective, well-established, international medical disaster relief organizations. These characteristics were first, ensuring an official invitation had been extended and the need for assistance had been identified. Second, the response to that need was done in an effective and sustainable manner. Third, effective organizations strived to obtain high-quality volunteers. By following the three key characteristics outlined in this research, organizations are more likely to improve the efficiency and quality of their work. In addition, they will be less likely to impede the overall recovery process. Broby N , Lassetter JH , Williams M , Winters BA . Effective international medical disaster relief: a qualitative descriptive study. Prehosp Disaster Med. 2018;33(2):119-126.

  20. Advanced Combustion and Emission Control Technical Team Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    The Advanced Combustion and Emission Control (ACEC) Technical Team is focused on removing technical barriers to the commercialization of advanced, high-efficiency, emission-compliant internal combustion (IC) engines for light-duty vehicle powertrains (i.e., passenger car, minivan, SUV, and pickup trucks).

  1. Motivational differences for participation among championship and non-championship caliber NCAA division III football teams.

    Science.gov (United States)

    Blegen, Mark D; Stenson, Matthew R; Micek, Dani M; Matthews, Tracey D

    2012-11-01

    Reasons for participation in National Collegiate Athletic Association (NCAA) Division III athletics vary greatly. The purpose of this study was to investigate if differences in motivational climate existed between championship and non-championship-level NCAA Division III football teams, and differences in player status (starter vs. nonstarter). Players (N = 224) from 3 NCAA Division III football programs (1 championship level and 2 non-championship level) were recruited as participants. All players completed the Sport Motivation Scale, and the results were analyzed using a 2 × 2 multivariate analysis of variance (MANOVA) to examine differences among the motivation variables for starter vs. nonstarter and championship vs. non-championship teams. A 1-way MANOVA was used to examine differences across year in school. Dependent variables included internal motivation to experience stimulation, internal motivation for accomplishment, internal motivation for knowledge, external motivation for identification regulation, external motivation for introjection regulation, external motivation for external regulation, and amotivation. The interaction between starter status and team was not significant (Λ = 0.996, p > 0.40). Additionally, there were no significant differences in the mean vector scores for starter vs. nonstarter (Λ = 0.965, p = 0.378). For team type, however, differences did exist across dependent variables (Λ = 0.898, p = 0.002). For all variables except amotivation, the championship-level team had significantly higher scores than the non-championship-level teams. Members of NCAA Division III championship-level football teams have higher motivation to participate in their sport compared with members of non-championship teams. These results could have an impact on player morale, coaching strategies, and future success in athletic-related activities.

  2. A Project Team: a Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Kateřina

    2014-06-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part discusses a team and a group with regards to its definition, classification and basic distinction, brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work is to verify the validity of the assumptions that the analyzed team represents a very disparate group as for its composition from the perspective of personality types, types of motivation, team roles and interpersonal relations in terms of the willingness of cooperation and communication. A separate output shall focus on sociometric investigation of those team members where willingness to work together and communicate is based on the authors’ assumption of tight interdependence.

  3. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems

  4. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  5. Team working in intensive care: current evidence and future endeavors.

    Science.gov (United States)

    Richardson, Joanne; West, Michael A; Cuthbertson, Brian H

    2010-12-01

    It has recently been argued that the future of intensive care medicine will rely on high quality management and teamwork. Therefore, this review takes an organizational psychology perspective to examine the most recent research on the relationship between teamwork, care processes, and patient outcomes in intensive care. Interdisciplinary communication within a team is crucial for the development of negotiated shared treatment goals and short-team patient outcomes. Interventions for maximizing team communication have received substantial interest in recent literature. Intensive care coordination is not a linear process, and intensive care teams often fail to discuss how to implement goals, trigger and align activities, or reflect on their performance. Despite a move toward interdisciplinary team working, clinical decision-making is still problematic and continues to be perceived as a top-down and authoritative process. The topic of team leadership in intensive care is underexplored and requires further research. Based on findings from the most recent research evidence in medicine and management, four principles are identified for improving the effectiveness of team working in intensive care: engender professional efficacy, create stable teams and leaders, develop trust and participative safety, and enable frequent team reflexivity.

  6. Assessing Performance and Learning in Interprofessional Health Care Teams.

    Science.gov (United States)

    Ekmekci, Ozgur; Sheingold, Brenda; Plack, Margaret; LeLacheur, Susan; Halvaksz, Jennifer; Lewis, Karen; Schlumpf, Karen; Greenberg, Larrie

    2015-01-01

    Teamwork has become an integral part of health care delivery. Such emphasis on teamwork has generated the need to systematically measure and improve the learning and performance of health care teams. The purpose of this study was to develop a comprehensive assessment instrument, the Interprofessional Education and Practice Inventory (IPEPI), to evaluate learning and performance in interprofessional health care teams. The 12-month study commenced in three 4-month phases: (1) a panel of 25 national and international experts participated in the Delphi process to identify factors influencing team learning and team performance; (2) the research team analyzed the findings from the two Delphi rounds to develop the IPEPI; and (3) a cohort of 27 students at the university engaged in clinical simulations to test and refine the IPEPI. Findings suggest key factors that significantly influence team learning and performance include whether the group is able to foster a climate of mutual respect, adopt effective communication strategies, develop a sense of trust, and invite contributions from others. Additionally, in assessing organizational factors, participants indicated those factors that significantly influence team learning and performance include whether the organization is patient-centered, creates a culture of safety (not blame), and supports individual and team learning. These findings highlight the critical role assessment plays in enhancing not just interprofessional education or interprofessional practice, but in essence advancing interprofessional education and practice--which requires an integrated examination of how health care professionals learn and perform in teams.

  7. Literature review on recent international activity in cooperative vehicle-highway automation systems.

    Science.gov (United States)

    2012-12-01

    This literature review supports the report, Recent International Activity in Cooperative VehicleHighway Automation Systems. It : reviews the published literature in English dating from 2007 or later about non-U.S.-based work on cooperative vehicle...

  8. Team Psychological Safety and Team Learning: A Cultural Perspective

    Science.gov (United States)

    Cauwelier, Peter; Ribière, Vincent M.; Bennet, Alex

    2016-01-01

    Purpose: The purpose of this paper was to evaluate if the concept of team psychological safety, a key driver of team learning and originally studied in the West, can be applied in teams from different national cultures. The model originally validated for teams in the West is applied to teams in Thailand to evaluate its validity, and the views team…

  9. Management Teams

    CERN Document Server

    Belbin, R Meredith Meredith

    2012-01-01

    Meredith Belbin's work on teams has become part of everyday language in organizations all over the world. All kinds of teams and team behaviours are covered. At the end of the book is a self-perception inventory so that readers can match their own personalities to particular team roles. Management Teams is required reading for managers concerned with achieving results by getting the best from their key personnel.

  10. Russian MINATOM nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    1999-03-01

    The 'Safety Research Strategic Plan for Russian Nuclear Power Plants' was published in draft form at the Russian International Nuclear Safety Centre (RINSC) by a working group of fifteen senior Russian experts. The Plan consists of 12 chapters, each addressing a specific technical area and containing a number of proposed research programmes and projects to advance the state-of-knowledge in that area. In part because a strong Recommendation to undertake such a Plan was made by the 1998 OECD/NEA study, the OECD Nuclear Energy Agency was asked by the Director of RINSC and the Director of USINSC to organize an international review of the Plan when the English-language version became available in October, 1998. This report represents the results of that review. (R.P.)

  11. Peer review in design: Understanding the impact of collaboration on the review process and student perception

    Science.gov (United States)

    Mandala, Mahender Arjun

    A cornerstone of design and design education is frequent situated feedback. With increasing class sizes, and shrinking financial and human resources, providing rich feedback to students becomes increasingly difficult. In the field of writing, web-based peer review--the process of utilizing equal status learners within a class to provide feedback to each other on their work using networked computing systems--has been shown to be a reliable and valid source of feedback in addition to improving student learning. Designers communicate in myriad ways, using the many languages of design and combining visual and descriptive information. This complex discourse of design intent makes peer reviews by design students ambiguous and often not helpful to the receivers of this feedback. Furthermore, engaging students in the review process itself is often difficult. Teams can complement individual diversity and may assist novice designers collectively resolve complex task. However, teams often incur production losses and may be impacted by individual biases. In the current work, we look at utilizing a collaborative team of reviewers, working collectively and synchronously, in generating web based peer reviews in a sophomore engineering design class. Students participated in a cross-over design, conducting peer reviews as individuals and collaborative teams in parallel sequences. Raters coded the feedback generated on the basis of their appropriateness and accuracy. Self-report surveys and passive observation of teams conducting reviews captured student opinion on the process, its value, and the contrasting experience they had conducting team and individual reviews. We found team reviews generated better quality feedback in comparison to individual reviews. Furthermore, students preferred conducting reviews in teams, finding the process 'fun' and engaging. We observed several learning benefits of using collaboration in reviewing including improved understanding of the assessment

  12. Virtual Team Governance: Addressing the Governance Mechanisms and Virtual Team Performance

    Science.gov (United States)

    Zhan, Yihong; Bai, Yu; Liu, Ziheng

    As technology has improved and collaborative software has been developed, virtual teams with geographically dispersed members spread across diverse physical locations have become increasingly prominent. Virtual team is supported by advancing communication technologies, which makes virtual teams able to largely transcend time and space. Virtual teams have changed the corporate landscape, which are more complex and dynamic than traditional teams since the members of virtual teams are spread on diverse geographical locations and their roles in the virtual team are different. Therefore, how to realize good governance of virtual team and arrive at good virtual team performance is becoming critical and challenging. Good virtual team governance is essential for a high-performance virtual team. This paper explores the performance and the governance mechanism of virtual team. It establishes a model to explain the relationship between the performance and the governance mechanisms in virtual teams. This paper is focusing on managing virtual teams. It aims to find the strategies to help business organizations to improve the performance of their virtual teams and arrive at the objectives of good virtual team management.

  13. Putting the "Team" in the Fine Arts Team: An Application of Business Management Team Concepts

    Science.gov (United States)

    Fisher, Ryan

    2007-01-01

    In this article, the author discusses current challenges to the idea of teamwork in fine arts teams, redefines the terms team and collaboration using a business management perspective, discusses the success of effective teams in the business world and the characteristics of those teams, and proposes the implementation of the business model of…

  14. A Project Team: A Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Katerina Hrazdilova Bockova

    2013-11-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part which discusses a team and a group with regards to its definition, classification and basic distinction brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work was to determine whether the existing team is not by its nature rather a working group that contributes to the generally perceived stagnation of that field.

  15. Tiger Team assessment of the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1991-08-01

    This report documents the Tiger Team Assessment of the Idaho National Engineering Laboratory (INEL) located in Idaho Falls, Idaho. INEL is a multiprogram, laboratory site of the US Department of Energy (DOE). Overall site management is provided by the DOE Field Office, Idaho; however, the DOE Field Office, Chicago has responsibility for the Argonne National Laboratory-West facilities and operations through the Argonne Area Office. In addition, the Idaho Branch Office of the Pittsburgh Naval Reactors Office has responsibility for the Naval Reactor Facility (NRF) at the INEL. The assessment included all DOE elements having ongoing program activities at the site except for the NRF. In addition, the Safety and Health Subteam did not review the Westinghouse Idaho Nuclear Company, Inc. facilities and operations. The Tiger Team Assessment was conducted from June 17 to August 2, 1991, under the auspices of the Office of Special Projects, Office of the Assistant Secretary for Environment, Safety and Health, Headquarters, DOE. The assessment was comprehensive, encompassing environmental, safety, and health (ES ampersand H) disciplines; management; and contractor and DOE self-assessments. Compliance with applicable federal, state, and local regulations; applicable DOE Orders; best management practices; and internal INEL site requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of the DOE and the site contractors management of ES ampersand H/quality assurance programs was conducted

  16. Tiger Team assessment of the Idaho National Engineering Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This report documents the Tiger Team Assessment of the Idaho National Engineering Laboratory (INEL) located in Idaho Falls, Idaho. INEL is a multiprogram, laboratory site of the US Department of Energy (DOE). Overall site management is provided by the DOE Field Office, Idaho; however, the DOE Field Office, Chicago has responsibility for the Argonne National Laboratory-West facilities and operations through the Argonne Area Office. In addition, the Idaho Branch Office of the Pittsburgh Naval Reactors Office has responsibility for the Naval Reactor Facility (NRF) at the INEL. The assessment included all DOE elements having ongoing program activities at the site except for the NRF. In addition, the Safety and Health Subteam did not review the Westinghouse Idaho Nuclear Company, Inc. facilities and operations. The Tiger Team Assessment was conducted from June 17 to August 2, 1991, under the auspices of the Office of Special Projects, Office of the Assistant Secretary for Environment, Safety and Health, Headquarters, DOE. The assessment was comprehensive, encompassing environmental, safety, and health (ES H) disciplines; management; and contractor and DOE self-assessments. Compliance with applicable federal, state, and local regulations; applicable DOE Orders; best management practices; and internal INEL site requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of the DOE and the site contractors management of ES H/quality assurance programs was conducted.

  17. Status of the Japanese ITER Home Team: January 1993

    International Nuclear Information System (INIS)

    Matsuda, Shinzaburo

    1994-01-01

    In June, 1992, Atomic Energy Commission of Japan determined the Third Phase Basic Program of Fusion Research and Development. It directs national policy for the experimental reactor phase of fusion research and development. As a government committee, the promotion and the planning of the entire fusion program will be continually carried out by the Fusion Council of Atomic Energy Commission. The Fusion Council has recently established an ITER Technical Committee which will give advice on technical matters of the ITER program to the Fusion Council. Thus, the government is ready to be fully supportive of ITER for the execution of this unprecedented international collaboration. There will be some other units to be organized in the fear future, in pace with the evolution of ITER activities. The involvement of other research institutes is open as a future possibility. The number of persons nominated as Home Team members is about 100 at present and will be increased depending upon the tasks assigned to the Japanese Home Team. The participation of industries in the EDA is of significant importance for the success of ITER. Firstly, innovative concepts or proposals owing to the technical expertise in other fields can be expected. Secondly, experience in production, fabrication or assembly is valuable in the integral review of the design. Thirdly, development and integration of production technologies are essential to realize future construction

  18. IAEA Concludes Safety Review at Chooz Nuclear Power Plant in France

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: An IAEA-led international team of nuclear safety experts noted good practices and made recommendations to reinforce safety measures during a review of operational safety at France's Chooz Nuclear Power Plant (NPP) that concluded today. The Operational Safety Review Team (OSART) was assembled at the French Government's request. The in-depth review, which began 17 June, focused on aspects essential to the safe operation of the NPP. The team comprised experts from Switzerland, Belgium, Germany, China, India, United Kingdom, Czech Republic, Canada, Hungary and the IAEA. The review covered the areas of management, organization and administration; training and qualification of personnel; operations; maintenance; technical support; operating experience; radiation protection; chemistry; emergency planning and preparedness; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards. The OSART team identified good plant practices that will be shared with the rest of the nuclear industry for consideration. Examples include: The plant has a professional development programme as part of a joint employment effort shared by the plant and its contractors. This enables trainees to develop professional capability, understand practices and gain experience from other nuclear power plants in terms of work planning and coordination; The plant has built a strong relationship between the on-shift response team of the plant and the local fire brigade to improve firefighting and rescue operations; Self-assessment groups discuss and resolve specific issues within operations, empowering operations personnel to take ownership of improvement programmes; and The plant has improved warnings at entrances to all o range zones , areas of elevated dose rates to which only authorized staff have access. The team identified a number of improvements to operational safety at Chooz NPP. Examples include: The plant should review its process for the

  19. Renewing the International Monetary Fund: A Review of the Issues

    OpenAIRE

    Danielle Lecavalier; Eric Santor

    2007-01-01

    Given the rapid and ongoing integration of the global economy, the International Monetary Fund needs to renew its role, governance structure, and functions if it is to maintain its relevance as the institution charged with promoting global financial stability. Lecavalier and Santor examine the areas of possible reform, including quota, voice, and representation; internal governance; surveillance; lending instruments; finances; and the Fund's role in low-income countries. They also review curr...

  20. APPLICATION OF FUZZY ANALYTIC HIERARCHY PROCESS TO BUILDING RESEARCH TEAMS

    Directory of Open Access Journals (Sweden)

    Karol DĄBROWSKI

    2016-01-01

    Full Text Available Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process and ANFIS (Adaptive Neuro Fuzzy Inference System methods in working groups building for R&D projects on the basis of employees skills.

  1. Application of Fuzzy Analytic Hierarchy Process to Building Research Teams

    Science.gov (United States)

    Dąbrowski, Karol; Skrzypek, Katarzyna

    2016-03-01

    Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process) and ANFIS (Adaptive Neuro Fuzzy Inference System) methods in working groups building for R&D projects on the basis of employees skills.

  2. Employee Knowledge Sharing in Work Teams: Effects of Team Diversity, Emergent States, and Team Leadership

    Science.gov (United States)

    Noh, Jae Hang

    2013-01-01

    Knowledge sharing in work teams is one of the critical team processes. Without sharing of knowledge, work teams and organizations may not be able to fully utilize the diverse knowledge brought into work teams by their members. The purpose of this study was to investigate antecedents and underlying mechanisms influencing the extent to which team…

  3. Conflict in medical teams: opportunity or danger?

    Science.gov (United States)

    Greer, Lindred L; Saygi, Ozum; Aaldering, Hillie; de Dreu, Carsten K W

    2012-10-01

      Intragroup conflicts often occur when people are called upon to collaborate in the accomplishment of a task. For example, when surgeons and nurses work together during an operation, conflicts may emerge because of differences in functional understanding. Whether these conflicts are beneficial or detrimental to team outcomes has been the source of much debate. From one perspective, a conflict that stems from differences in members' functional understanding may enhance team members' understanding and performance of the task at hand. By contrast, such a conflict may cause hostility, emotionality and distraction from actual task accomplishment.   This study reviews findings on the relationships between intragroup conflict and team outcomes, discusses potential conflict resolution strategies for intragroup conflicts and explores how these link to the field of medical education.   Three primary types of conflict have been distinguished, involving, respectively, task-, process- and relationship-associated conflict. Both process conflict, or conflict about the logistics of task accomplishment, and relationship conflict, or conflict about interpersonal incompatibilities, have been shown to detract from effective team functioning. Task conflict, or conflict about the content of the task itself, is also generally negative for team functioning, but under certain conditions its negative effects may be minimised. For example, when teams can clearly separate task issues from relationship issues, task conflicts are less destructive for team outcomes. However, achieving such a separation in practice, and thereby realising the benefits of task conflict, is quite difficult to achieve.   Intragroup conflicts pose a challenge to effective team functioning. In the education of medical professionals, effective training in conflict management skills and their application to specific team conflict dynamics, such as with reference to how to resolve task as opposed to relationship

  4. Learning Team Review 2016-0001: Installing Outlets for Programmatic Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Dunwoody, John Tyler [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Obrey, Kimberly Ann [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Bridgewater, Jon S. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Griego, Frank X. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brenner, Andrew Karl [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Lopez, Ted T. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Henderson, Kevin C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gordon, Lloyd Baumgardner [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Blumberg, Paul A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Wilburn, Dianne Williams [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-08

    The purpose of a Learning Team is to transfer and communicate the information into operational feedback and improvement. We want to pay attention to the small things that go wrong because they are often early warning signals and may provide insight into the health of the whole system. An ESR was placed in the October of 2015 to move/install a number of 120V and 208V outlets in 455-104B to support programmatic furnace needs. Electrical design review was completed for ESR 22217 on February 22, 2016 and a Design Change Form completed describing the modification needed as: demolish 1 existing receptacle and circuit leaving conduit and jbox for use to install new receptacle and 5 new receptacles/circuits are required and one existing receptacle is to be relocated, listed under FSR 149229. The FSR scope of work was written:: Please have the Electricians come out to perform demolition (1ea.), installation (6ea.)& relocation (1ea.) of receptacles / circuits. ESR 22217 & DCF-16-35-0455-1281 is in place for this work. Coordinate final receptacle locations with Laboratory Resident. Contact John Dunwoody or O-MC for this information. WO# 545580-01 was signed on April 20, 2016.: Electricians to perform demolition, installation, & relocation of receptacles / circuits PER attached DCF-16-0455-1281-SK-1.

  5. Towards a Methodology for Managing Competencies in Virtual Teams - A Systemic Approach

    Science.gov (United States)

    Schumacher, Marinita; Stal-Le Cardinal, Julie; Bocquet, Jean-Claude

    Virtual instruments and tools are future trends in Engineering which are a response to the growing complexity of engineering tasks, the facility of communication and strong collaborations on the international market. Outsourcing, off-shoring, and the globalization of organisations’ activities have resulted in the formation of virtual product development teams. Individuals who are working in virtual teams must be equipped with diversified competencies that provide a basis for virtual team building. Thanks to the systemic approach of the functional analysis our paper responds to the need of a methodology of competence management to build virtual teams that are active in virtual design projects in the area of New Product Development (NPD).

  6. [Investigation of team processes that enhance team performance in business organization].

    Science.gov (United States)

    Nawata, Kengo; Yamaguchi, Hiroyuki; Hatano, Toru; Aoshima, Mika

    2015-02-01

    Many researchers have suggested team processes that enhance team performance. However, past team process models were based on crew team, whose all team members perform an indivisible temporary task. These models may be inapplicable business teams, whose individual members perform middle- and long-term tasks assigned to individual members. This study modified the teamwork model of Dickinson and McIntyre (1997) and aimed to demonstrate a whole team process that enhances the performance of business teams. We surveyed five companies (member N = 1,400, team N = 161) and investigated team-level-processes. Results showed that there were two sides of team processes: "communication" and "collaboration to achieve a goal." Team processes in which communication enhanced collaboration improved team performance with regard to all aspects of the quantitative objective index (e.g., current income and number of sales), supervisor rating, and self-rating measurements. On the basis of these results, we discuss the entire process by which teamwork enhances team performance in business organizations.

  7. 17 April 2008 - Head of Internal Audit Network meeting visiting the ATLAS experimental area with CERN ATLAS Team Leader P. Fassnacht, ATLAS Technical Coordinator M. Nessi and ATLAS Resources Manager M. Nordberg.

    CERN Multimedia

    Mona Schweizer

    2008-01-01

    17 April 2008 - Head of Internal Audit Network meeting visiting the ATLAS experimental area with CERN ATLAS Team Leader P. Fassnacht, ATLAS Technical Coordinator M. Nessi and ATLAS Resources Manager M. Nordberg.

  8. The effects on team emotions and team effectiveness of coaching in interprofessional health and social care teams.

    Science.gov (United States)

    Dimas, Isabel Dórdio; Renato Lourenço, Paulo; Rebelo, Teresa

    2016-07-01

    The purpose of this study was to examine the effects of coaching behaviours provided by peers and by the leader on the emotions experienced by interprofessional health and social care teams and on members' satisfaction with the team, as well as on team performance. Data were obtained from a survey among 344 employees working in 52 interprofessional health and social care teams from nine Portuguese organizations. The results show that leader coaching and peer coaching have a positive effect on the level of team members' satisfaction with the team and on positive emotions, and a negative effect on negative emotions. Furthermore, coaching provided by peers presents a positive effect on team performance as assessed by the leader of the team. Our findings put forward the importance of engaging in coaching behaviours to promote quality of the team experience, as well as the achievement of team performance objectives. Further studies should explore how coaching behaviours impact the patient, whose well-being is the ultimate objective of a team in the health and social care system, namely in terms of the patient's perception of quality care or patient outcomes.

  9. Wartime rugby and football: sports elites, French military teams and international meets during the First World War.

    Science.gov (United States)

    Waquet, Arnaud; Vincent, Joris

    2011-01-01

    The First World War is traditionally considered in history as a temporary halt for cultural and sporting activities. If the Olympic Games and the Tour de France were actually cancelled, football and rugby were in fact stimulated by the circumstances of war. Indeed, the gathering of allied nations behind the Western Front emerged as the main factor in the development of these two sports. Reading the sporting press and military archives shows that international sporting exchanges were stimulated during the Great War. To be specific, France benefited from the golden opportunity provided by the presence of the masters of the game to strengthen its practices and affirm its status as a sporting nation. Inter-allied sporting exchanges were primarily characterised by informal encounters between military selections. Then, following the recognition of these sports by the military authorities, the number of exchanges increased. At the end of 1917, the official status acquired by sport within the military forces created the conditions for the structuring of the French sporting elite. From that point, we can witness the birth of the first French military rugby and football teams, as they demonstrate, through their good performances during the demobilisation period, the progressive build-up of the international dimension of French sport during the war years.

  10. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    2016-01-01

    types of team formation: random teacher pre-assigned, student selection, and teacher directed diversity. In each of these modules, ethnographic methods (interviews and observations) were employed. Additionally, we had access to students learning logs, formative and summative assessments, and final exams...... functioning entrepreneurial student teams as most teams lack personal chemistry which makes them anchor their work too much in a pre-defined project. In contrast, we find that students that can form their own teams aim for less diverse teams than what is achieved by random assignment. However, the homophily......Questions we care about (Objectives): When students have to work on challenging tasks, as it is often the case in entrepreneurship classrooms that leverage experiential learning, team success becomes central to the students learning. Yet, the formation of teams is often left up to the students...

  11. Robotics Team Lights Up New Year's Eve

    Science.gov (United States)

    LeBlanc, Cheryl

    2011-01-01

    A robotics team from Muncie, Indiana--the PhyXTGears--is made up of high school students from throughout Delaware County. The group formed as part of the FIRST Robotics program (For Inspiration and Recognition of Science and Technology), an international program founded by inventor Dean Kamen in which students work with professional engineers and…

  12. International Chernobyl project [AEA report

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The IAEA have co-ordinated the first international assessment of the radiological consequences of the Chernobyl accident in the affected areas outside the 30km prohibited zone around the reactor. These areas have a total population of about 1 million people, living in approximately 2700 settlements. The main aim of the project was to answer the question 'Is it safe for the population to go on living in the affected areas?'. The project did not investigate radiological health effects among more than 100 000 people evacuated from the 30 km prohibited zone. Nor did it study effects among the emergency personnel temporarily brought into the region for accident management and recovery work (the so-called 'liquidators'). Project teams reviewed official data on environmental contamination from 500 settlements, data collection practices and reporting and also official information on radiation doses received by people living in seven settlements. Other project teams reviewed official data at key medical centres and institutes. Then they examined people both from surveyed contaminated settlement and from surveyed control settlements. The team concluded that there were significant non-radiation related health disorders in populations of both contaminated and control settlements. None of the disorders could be attributed directly to radiation exposure. In particular, no evidence was found for a significant increase in foetal abnormalities; infant and prenatal mortality rates had fallen since the accident. Children were found to be generally healthy with no abnormalities in either thyroid stimulating or thyroid hormones. The accident had created substantial negative psychological consequences, manifesting themselves in terms of anxiety and stress due to continuing high levels of uncertainty. (author)

  13. The Team to Address Bariatric Care in Canadian Children (Team ABC3): Team Grant Research Proposal.

    Science.gov (United States)

    2017-10-05

    Severe obesity (SO) in Canadian children remains poorly understood. However, based on international data, the prevalence of SO appears to be increasing and is associated with a number of psychosocial, bio-mechanical, and cardiometabolic health risks. The purpose of our national Team to Address Bariatric Care in Canadian Children (Team ABC3) is to develop and lead a series of inter-related studies to enhance the understanding and management of SO in Canadian children and adolescents (0-18 years). From 2015 to 2019, Team ABC3 will conduct a series of projects at the regional, provincial, and national levels using multiple methods and study designs to respond to key knowledge gaps by (i) generating evidence on the prevalence of SO and its impact on health services utilization in children using existing Canadian data sources from primary care settings, (ii) exploring contemporary definitions of SO that link with health outcomes, (iii) comparing and contrasting health risks across the continuum of SO, (iv) understanding potential barriers to and facilitators of treatment success in children with SO, and (v) examining innovative lifestyle and behavioral interventions designed to successfully manage SO in children and their families. Furthermore, to examine the impact of innovative interventions on the management SO, we will (vi) evaluate whether adding a health coach, who provides support via text, email, and/or phone, improves children's ability to adhere to a web-based weight management program and (vii) test the feasibility and impact of a community-based weight management program for pre-school children with SO and their parents that combines group-based parenting sessions with in-home visits. Our research aligns with national priorities in obesity research, brings together leading scientists, clinicians, and stakeholders from across Canada, and will inform health services delivery throughout the country to provide the best care possible for children with SO and

  14. Cheap Talk: “Team Factors and Management Practices Influence on Team Trust”

    OpenAIRE

    Doris Padmini Selvaratnam; Aini Aman; Muhamad Maziz Mahyuddin Bin Kamaludin; Gary Lynn; Richard Reilly

    2016-01-01

    Team trust has been cited as a contributing factor towards team performance. This paper looks at the antecedents of team trust and to what extent they influence team trust. The antecedents of team trust are team factors like team autonomy, team stability and team member experience; and the management practices are top management involvement and management support. The results demonstrated that team factors and management practices influence team trust individually. The key find...

  15. Factors impacting on psychological wellbeing of international students in the health professions: A scoping review.

    Science.gov (United States)

    McKenna, Lisa; Robinson, Eddie; Penman, Joy; Hills, Danny

    2017-09-01

    There are increasing numbers of international students undertaking health professional courses, particularly in Western countries. These courses not only expose students to the usual stresses and strains of academic learning, but also require students to undertake clinical placements and practice-based learning. While much is known about general issues facing international students, less is known about factors that impact on those studying in the health professions. To explore what is known about factors that influence the psychological wellbeing of international students in the health professions. A scoping review. A range of databases were searched, including CINAHL, Medline, Scopus, Proquest and ERIC, as well as grey literature, reference lists and Google Scholar. The review included qualitative or quantitative primary peer reviewed research studies that focused on international undergraduate or postgraduate students in the health professions. The core concept underpinning the review was psychological issues, with the outcome being psychological and/or social wellbeing. Thematic analysis across studies was used to identify key themes emerging. A total of 13 studies were included in the review, from the disciplines of nursing, medicine and speech-language pathology. Four key factor groups emerged from the review: negotiating structures and systems, communication and learning, quality of life and self-care, and facing discrimination and social isolation. International health professional students face similar issues to other international students. The nature of their courses, however, also requires negotiating different health care systems, and managing a range of clinical practice issues including with communication, and isolation and discrimination from clinical staff and patients. Further research is needed to specifically explore factors impacting on student well-being and how international students can be appropriately prepared and supported for their

  16. Educational Activity: A Preliminary Review and Some International Experiences

    Directory of Open Access Journals (Sweden)

    Salem Ali Al Qahtani

    2017-11-01

    Full Text Available This paper reviews the history of the educational activity which was entered through John Dewey’s Experimental School, founded in 1896, the first school to use the activity curriculum. It sheds the light on the stages that activity has gone through till today. The Islamic view and a number of quotes from a number of Islamic thinkers and educators also were reviewed. The importance of the activity, its basics, functions, types and classifications were also discussed. The research concluded with a number of international experiences which gave great importance to the activity in their curricula and educational plans. The most important recommendations are: 1 Offering advanced training programs for teachers on educational activity; 2 Adding educational activity as an independent material in educational colleges; 3 Expanding the scope of study for international experiences in educational activity; and 4 Making use of technology and employing it in the educational activity.

  17. Hayabusa Asteroidal Sample Preliminary Examination Team (HASPET) and the Astromaterial Curation Facility at JAXA/ISAS

    Science.gov (United States)

    Yano, H.; Fujiwara, A.

    After the successful launch in May 2003, the Hayabusa (MUSES-C) mission of JAXA/ISAS will collect surface materials (e.g., regolith) of several hundred mg to several g in total from the S-type near Earth asteroid (25143) Itokawa in late 2005 and bring them back to ground laboratories in the summer of 2007. The retrieved samples will be given initial analysis at the JAXA/ISAS astromaterial curation facility, which is currently in the preparation for its construction, by the Hayabusa Asteroidal Sample Preliminary Examination Team (HASPET). HASPET is consisted of the ISAS Hayabusa team, the international partners from NASA and Australia and all-Japan meteoritic scientists to be selected as outsourcing parts of the initial analyses. The initial analysis to characterize general aspects of returned samples can consume only 15 % of its total mass and must complete the whole analyses including the database building before international AO for detailed analyses within the maximum of 1 year. Confident exercise of non-destructive, micro-analyses whenever possible are thus vital for the HASPET analysis. In the purpose to survey what kinds and levels of micro-analysis techniques in respective fields, from major elements and mineralogy to trace and isotopic elements and organics, are available in Japan at present, ISAS has conducted the HASPET open competitions in 2000-01 and 2004. The initial evaluation was made by multiple domestic peer reviews. Applicants were then provided two kinds of unknown asteroid sample analogs in order to conduct proposed analysis with self-claimed amount of samples in self-claimed duration. After the completion of multiple, international peer reviews, the Selection Committee compiled evaluations and recommended the finalists of each round. The final members of the HASPET will be appointed about 2 years prior to the Earth return. Then they will conduct a test-run of the whole initial analysis procedures at the ISAS astromaterial curation facility and

  18. [Support Team for Investigator-Initiated Clinical Research].

    Science.gov (United States)

    Fujii, Hisako

    2017-07-01

    Investigator-initiated clinical research is that in which investigators plan and carry out their own clinical research in academia. For large-scale clinical research, a team should be organized and implemented. This team should include investigators and supporting staff, who will promote smooth research performance by fulfilling their respective roles. The supporting staff should include project managers, administrative personnel, billing personnel, data managers, and clinical research coordinators. In this article, I will present the current status of clinical research support and introduce the research organization of the Dominantly Inherited Alzheimer Network (DIAN) study, an investigator-initiated international clinical research study, with particular emphasis on the role of the project management staff and clinical research coordinators.

  19. Managing Dynamic Collaborative Action Teams in a Net-Centric Environment

    National Research Council Canada - National Science Library

    Salamacha, Christine O; Briscoe, N. R; Forsythe, Steven L

    2005-01-01

    ...) and collaborative groups. While collaborative groups and teams are not new concepts, new technologies will transform collaborative C2 and how warfighters interact in the same way that the internal combustion engine combined...

  20. Mobile autopsy teams in the investigation of war crimes in Kosovo 1999

    DEFF Research Database (Denmark)

    Sprogøe-Jakobsen, S; Eriksson, A; Hougen, H P

    2001-01-01

    On request of the International Criminal Tribunal for the former Yugoslavia (ICTY), the Danish-Swedish forensic teams worked in Kosovo during the summer and the fall of 1999. The teams worked mainly as "mobile teams" at sites with few graves. Only two larger sites were examined. Most of the bodie....... A total of 308 bodies, mainly males, were examined. The age varied greatly with a mean age of 47 years. The most common cause of death was gun shot wounds and the most common manner of death was homicide....

  1. Processes of international collaboration in management research

    DEFF Research Database (Denmark)

    Jonsen, Karsten; Butler, Christina; Mäkelä, Kristiina

    2013-01-01

    Scientists and academics increasingly work on collaborative projects and write papers in international research teams. This trend is driven by greater publishing demands in terms of the quality and breadth of data and analysis methods, which tend to be difficult to achieve without collaborating...... across institutional and national boundaries. Yet, our understanding of the collaborative processes in an academic setting and the potential tensions associated with them remains limited. We use a reflexive, autoethnographic approach to explicitly investigate our own experiences of international...... collaborative research. We offer systematic insights into the social and intellectual processes of academic collaborative writing, identifying six lessons and two key tensions that influence the success of international research teams. Our findings may benefit the formation of future coauthor teams...

  2. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  3. Workflow Enhancement (WE) Improves Safety in Radiation Oncology: Putting the WE and Team Together

    International Nuclear Information System (INIS)

    Chao, Samuel T.; Meier, Tim; Hugebeck, Brian; Reddy, Chandana A.; Godley, Andrew; Kolar, Matt; Suh, John H.

    2014-01-01

    Purpose: To review the impact of a workflow enhancement (WE) team in reducing treatment errors that reach patients within radiation oncology. Methods and Materials: It was determined that flaws in our workflow and processes resulted in errors reaching the patient. The process improvement team (PIT) was developed in 2010 to reduce errors and was later modified in 2012 into the current WE team. Workflow issues and solutions were discussed in PIT and WE team meetings. Due to tensions within PIT that resulted in employee dissatisfaction, there was a 6-month hiatus between the end of PIT and initiation of the renamed/redesigned WE team. In addition to the PIT/WE team forms, the department had separate incident forms to document treatment errors reaching the patient. These incident forms are rapidly reviewed and monitored by our departmental and institutional quality and safety groups, reflecting how seriously these forms are treated. The number of these incident forms was compared before and after instituting the WE team. Results: When PIT was disbanded, a number of errors seemed to occur in succession, requiring reinstitution and redesign of this team, rebranded the WE team. Interestingly, the number of incident forms per patient visits did not change when comparing 6 months during the PIT, 6 months during the hiatus, and the first 6 months after instituting the WE team (P=.85). However, 6 to 12 months after instituting the WE team, the number of incident forms per patient visits decreased (P=.028). After the WE team, employee satisfaction and commitment to quality increased as demonstrated by Gallup surveys, suggesting a correlation to the WE team. Conclusions: A team focused on addressing workflow and improving processes can reduce the number of errors reaching the patient. Time is necessary before a reduction in errors reaching patients will be seen

  4. Workflow Enhancement (WE) Improves Safety in Radiation Oncology: Putting the WE and Team Together

    Energy Technology Data Exchange (ETDEWEB)

    Chao, Samuel T., E-mail: chaos@ccf.org [Department of Radiation Oncology, Taussig Cancer Institute, Cleveland Clinic, Cleveland, Ohio (United States); Rose Ella Burkhardt Brain Tumor and Neuro-oncology Center, Cleveland Clinic, Cleveland, Ohio (United States); Meier, Tim; Hugebeck, Brian; Reddy, Chandana A.; Godley, Andrew; Kolar, Matt [Department of Radiation Oncology, Taussig Cancer Institute, Cleveland Clinic, Cleveland, Ohio (United States); Suh, John H. [Department of Radiation Oncology, Taussig Cancer Institute, Cleveland Clinic, Cleveland, Ohio (United States); Rose Ella Burkhardt Brain Tumor and Neuro-oncology Center, Cleveland Clinic, Cleveland, Ohio (United States)

    2014-07-15

    Purpose: To review the impact of a workflow enhancement (WE) team in reducing treatment errors that reach patients within radiation oncology. Methods and Materials: It was determined that flaws in our workflow and processes resulted in errors reaching the patient. The process improvement team (PIT) was developed in 2010 to reduce errors and was later modified in 2012 into the current WE team. Workflow issues and solutions were discussed in PIT and WE team meetings. Due to tensions within PIT that resulted in employee dissatisfaction, there was a 6-month hiatus between the end of PIT and initiation of the renamed/redesigned WE team. In addition to the PIT/WE team forms, the department had separate incident forms to document treatment errors reaching the patient. These incident forms are rapidly reviewed and monitored by our departmental and institutional quality and safety groups, reflecting how seriously these forms are treated. The number of these incident forms was compared before and after instituting the WE team. Results: When PIT was disbanded, a number of errors seemed to occur in succession, requiring reinstitution and redesign of this team, rebranded the WE team. Interestingly, the number of incident forms per patient visits did not change when comparing 6 months during the PIT, 6 months during the hiatus, and the first 6 months after instituting the WE team (P=.85). However, 6 to 12 months after instituting the WE team, the number of incident forms per patient visits decreased (P=.028). After the WE team, employee satisfaction and commitment to quality increased as demonstrated by Gallup surveys, suggesting a correlation to the WE team. Conclusions: A team focused on addressing workflow and improving processes can reduce the number of errors reaching the patient. Time is necessary before a reduction in errors reaching patients will be seen.

  5. Audit Oversight: Quality Control Review of the Defense Finance and Accounting Service Office of Internal Review

    National Research Council Canada - National Science Library

    2004-01-01

    .... The Government Auditing Standards (GAS) require that an audit organization performing Government audits have an appropriate internal quality control system and undergo an external quality control review every 3 years by an organization...

  6. The relevance of team characteristics and team directed strategies in the implementation of nursing innovations : A literature review

    NARCIS (Netherlands)

    Theo van Achterberg; Joke Mintjes; G. Holleman; E. Poot

    2009-01-01

    Implementation of innovations is a complex and intensive procedure in which different strategies can be successful. In nursing, strategies often focus on intrinsic motivation, competencies and attitudes of individual nurses while ignoring the social context. Since nurses often work in teams,

  7. The relationship between servant leadership, organisational citizenship behaviour and team effectiveness

    Directory of Open Access Journals (Sweden)

    Bright Mahembe

    2014-02-01

    Research purpose: The goal of the study was to analyse the relationships between servant leadership, OCB and team effectiveness in the South African school system. Motivation for the study: The changing nature of leadership, coupled with the increased use of teams, necessitates a study on how follower-focused leadership practices enhance team member effectiveness. Research approach, design and method: A non-probability sample of 288 teachers was drawn from 38 schools in the Western Cape in South Africa. Item analysis and confirmatory factor analysis were conducted on the data. Main findings: The team effectiveness and refined servant leadership questionnaires displayed high levels of internal consistency. The organisational citizenship behaviour scale exhibited moderate reliability coefficients. Good fit was found for the structural and measurement models of the latent variables through confirmatory factor analysis and structural equation modelling. Positive relationships were found between servant leadership, team effectiveness and OCB. Practical/managerial implications: The findings emphasise the role played by servant leadership behaviours in promoting positive behaviours and outcomes for teams. Future studies should develop the theoretical model further, by identifying other variables that influence team effectiveness positively and testing the model using revenue-oriented teams. Contribution/value-add: Schools today face the challenge of developing strategies for achieving team effectiveness. The servant leadership style recognises and promotes the one-on-one development of followers likely to promote positive outcomes and team effectiveness.

  8. CisLunar Habitat Internal Architecture Design Criteria

    Science.gov (United States)

    Jones, R.; Kennedy, K.; Howard, R.; Whitmore, M.; Martin, C.; Garate, J.

    2017-01-01

    BACKGROUND: In preparation for human exploration to Mars, there is a need to define the development and test program that will validate deep space operations and systems. In that context, a Proving Grounds CisLunar habitat spacecraft is being defined as the next step towards this goal. This spacecraft will operate differently from the ISS or other spacecraft in human history. The performance envelope of this spacecraft (mass, volume, power, specifications, etc.) is being defined by the Future Capabilities Study Team. This team has recognized the need for a human-centered approach for the internal architecture of this spacecraft and has commissioned a CisLunar Phase-1 Habitat Internal Architecture Study Team to develop a NASA reference configuration, providing the Agency with a "smart buyer" approach for future acquisition. THE CISLUNAR HABITAT INTERNAL ARCHITECTURE STUDY: Overall, the CisLunar Habitat Internal Architecture study will address the most significant questions and risks in the current CisLunar architecture, habitation, and operations concept development. This effort is achieved through definition of design criteria, evaluation criteria and process, design of the CisLunar Habitat Phase-1 internal architecture, and the development and fabrication of internal architecture concepts combined with rigorous and methodical Human-in-the-Loop (HITL) evaluations and testing of the conceptual innovations in a controlled test environment. The vision of the CisLunar Habitat Internal Architecture Study is to design, build, and test a CisLunar Phase-1 Habitat Internal Architecture that will be used for habitation (e.g. habitability and human factors) evaluations. The evaluations will mature CisLunar habitat evaluation tools, guidelines, and standards, and will interface with other projects such as the Advanced Exploration Systems (AES) Program integrated Power, Avionics, Software (iPAS), and Logistics for integrated human-in-the-loop testing. The mission of the Cis

  9. Cohesion in Online Student Teams versus Traditional Teams

    Science.gov (United States)

    Hansen, David E.

    2016-01-01

    Researchers have found that the electronic methods in use for online team communication today increase communication quality in project-based work situations. Because communication quality is known to influence group cohesion, the present research examined whether online student project teams are more cohesive than traditional teams. We tested…

  10. “Systemic approach to teamwork - a model for team building”

    OpenAIRE

    Nikolova, Elena; Gogova Samonikov, Marija

    2012-01-01

    Today in the global economy the importance of teamwork in the workplace receives significant attention. Teamwork is not only important, it is essential, especially for the companies that are part of the international business - they produce at one continent at the moment, then a few days later deliver the goods to the customers to another. The focus of this paper is the analysis of the team building process, regardless of the purpose or the task the teams perform. The main objective is t...

  11. New recommendations from the International Commission on Radiological Protection-a review

    International Nuclear Information System (INIS)

    Wrixon, A D

    2008-01-01

    For almost half a century, the International Commission on Radiological Protection (ICRP) has revised its recommendations on radiological protection with an average frequency of about 10 years, building on the experience gained in their implementation. This has ensured that the recommendations remain up to date and fit for purpose and it is this that has led in turn to their wide acceptance internationally. Indeed, the 1990 version of the recommendations forms the basis of the international radiological protection standards and the systems of control of exposure to ionizing radiation in many countries throughout the world. This version introduced new concepts and a more holistic approach to radiological protection but marrying the different exposure situations into one coherent framework has proved not to be straightforward and further reflection seemed necessary in order to satisfy both those who are responsible for the development of the control systems as well as a broader audience. Review of the 1990 recommendations started around 1998 and, since then, many ideas have been explored and avenues followed. Eventually, new recommendations were agreed by the Commission at its meeting in Essen in March 2007. This paper provides a review of these new recommendations and their possible implications. (topical review)

  12. Team Action Imagery and Team Cognition: Imagery of Game Situations and Required Team Actions Promotes a Functional Structure in Players' Representations of Team-Level Tactics.

    Science.gov (United States)

    Frank, Cornelia; Linstromberg, Gian-Luca; Hennig, Linda; Heinen, Thomas; Schack, Thomas

    2018-02-01

    A team's cognitions of interpersonally coordinated actions are a crucial component for successful team performance. Here, we present an approach to practice team action by way of imagery and examine its impact on team cognitions in long-term memory. We investigated the impact of a 4-week team action imagery intervention on futsal players' mental representations of team-level tactics. Skilled futsal players were assigned to either an imagery training group or a no imagery training control group. Participants in the imagery training group practiced four team-level tactics by imagining team actions in specific game situations for three times a week. Results revealed that the imagery training group's representations were more similar to that of an expert representation after the intervention compared with the control group. This study indicates that team action imagery training can have a significant impact on players' tactical skill representations and thus order formation in long-term memory.

  13. Teaming in Two-Year Postsecondary Settings: An Approach to Providing Effective and Efficient Services for Students with Disabilities.

    Science.gov (United States)

    Bigaj, Stephen J.; Bazinet, Gregory P.

    1993-01-01

    Suggests a team approach for effectively and efficiently providing services for postsecondary students with disabilities. Reviews various teaming concepts and presents a framework for a postsecondary disability problem-solving team. (Author/JOW)

  14. Learning Team Review 2016-0002 Parking Lot Event 2016

    Energy Technology Data Exchange (ETDEWEB)

    Wilburn, Dianne Williams [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Bitteker, Leo John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brooks, Melynda Louise [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Romero-Trujillo, Natalie [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Currie, Scott Allister [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Martin, Joanne Skrivan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Sondheim, Walter E. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Tovesson, Fredrik [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Young, Jennifer S. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Crespin, Thomas Joe [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-02

    The purpose of a Learning Team is to transfer and communicate the information into operational feedback and improvement. We want to pay attention to the small things that go wrong because they are often early warning signals and may provide insight into the health of the whole system. The incident involved the collision of a van with a forklift having raised tines in rainy, overcast weather.

  15. The effect of rapid response teams on end-of-life care: A retrospective chart review

    Science.gov (United States)

    Tam, Benjamin; Salib, Mary; Fox-Robichaud, Alison

    2014-01-01

    BACKGROUND: A subset of critically ill patients have end-of-life (EOL) goals that are unclear. Rapid response teams (RRTs) may aid in the identification of these patients and the delivery of their EOL care. OBJECTIVES: To characterize the impact of RRT discussion on EOL care, and to examine how a preprinted order (PPO) set for EOL care influenced EOL discussions and outcomes. METHODS: A single-centre retrospective chart review of all RRT calls (January 2009 to December 2010) was performed. The effect of RRT EOL discussions and the effect of a hospital-wide PPO set on EOL care was examined. Charts were from the Ontario Ministry of Health and Long-Term Care Critical Care Information Systemic database, and were interrogated by two reviewers. RESULTS: In patients whose EOL status changed following RRT EOL discussion, there were fewer intensive care unit (ICU) transfers (8.4% versus 17%; PEOL status following the introduction of an EOL PPO, from 20% (before) to 31% (after) (PEOL status following RRT-led EOL discussion was associated with reduced ICU transfers and enhanced access to palliative care services. Further study is required to identify and deconstruct barriers impairing timely and appropriate EOL discussions. PMID:25299222

  16. Experience of the United States in Hosting and Supporting IAEA Peer Review Missions

    International Nuclear Information System (INIS)

    Mamish, N.

    2016-01-01

    The International Atomic Energy Agency (IAEA) provides a number of peer review services to its Member States. The United States has strongly supported these peer reviews since their inception. In 2010, the United States hosted an Integrated Regulatory Review Service (IRRS) mission, with a follow-up mission completed in 2014. The missions provided valuable recommendations and suggestions, identified a number of best practices, and acknowledged the prompt and effective actions taken by the NRC following the Fukushima Daiichi accident. Through hosting an International Physical Protection Advisory Service (IPPAS) mission in 2013, the United States benefited both from the insights provided by the team, as well as the U.S. Government’s gap analyses and preparatory efforts in advance of the mission. The United States strongly supports the IAEA’s Operational Safety Review Team (OSART) program, inviting a peer review mission to a U.S. nuclear power plant every 3 years. Although OSART is an operational, not regulatory, peer review, the NRC provides funding for the mission and gives inspection credit to operators that host them. The United States also contributes significant technical expertise to IAEA peer review missions hosted by other Member States. With the IRRS and IPPAS reaching their 10th and 20th anniversaries respectively, these programs have improved as they have matured. However, it remains critical for Member States to continue to support these programs, and provide feedback to the IAEA Secretariat on their effectiveness and areas where IAEA might enhance them. Doing so will ensure peer reviews remain an effective tool for strengthening nuclear safety and security worldwide. (author)

  17. Distributed control of multi-robot teams: Cooperative baton passing task

    Energy Technology Data Exchange (ETDEWEB)

    Parker, L.E.

    1998-11-01

    This research addresses the problem of achieving fault tolerant cooperation within small- to medium-sized teams of heterogeneous mobile robots. The author describes a novel behavior-based, fully distributed architecture, called ALLIANCE, that utilizes adaptive action selection to achieve fault tolerant cooperative control. The robots in this architecture possess a variety of high-level functions that they can perform during a mission, and must at all times select an appropriate action based on the requirements of the mission, the activities of other robots, the current environmental conditions, and their own internal states. Since such cooperative teams often work in dynamic and unpredictable environments, the software architecture allows the team members to respond robustly and reliably to unexpected environmental changes and modifications in the robot team that may occur due to mechanical failure, the learning of new skills, or the addition or removal of robots from the team by human intervention. After presenting ALLIANCE, they describe the implementation of this architecture on a team of physical mobile robots performing a cooperative baton passing task. These experiments illustrate the ability of ALLIANCE to achieve adaptive, fault-tolerant cooperative control amidst dynamic changes during the task.

  18. International Nuclear Officials Discuss IAEA Peer Reviews of Nuclear Safety Regulations

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: Senior nuclear regulators today concluded a Workshop on the Lessons Learned from the IAEA Integrated Regulatory Review Service (IRRS) Missions. The U.S. Nuclear Regulatory Commission (NRC) hosted the workshop, in cooperation with the International Atomic Energy Agency, in Washington, DC, from 26 to 28 October 2011. About 60 senior regulators from 22 IAEA Member States took part in this workshop. The IRRS programme is an international peer review service offered by the IAEA to its Member States to provide an objective evaluation of their nuclear safety regulatory framework. The review is based on the internationally recognized IAEA Safety Standards. ''The United States Nuclear Regulatory Commission was pleased to host the IAEA's IRRS meeting this week. The discussions over the past three days have provided an important opportunity for regulators from many countries to come together to strengthen the international peer review process,'' said U.S. NRC Chairman Gregory B. Jaczko. ''Especially after the Fukushima Daiichi accident, the global community recognizes that IRRS missions fill a vital role in strengthening nuclear safety and security programs around the world, and we are proud to be a part of this important effort.'' The IAEA Action Plan on Nuclear Safety includes actions focused towards strengthening the existing IAEA peer reviews, incorporating lessons learned and improving their effectiveness. The workshop provided a platform for the exchange of information, experience and lessons learned from the IRRS missions, as well as expectations for the IRRS programme for the near future. Further improvements in the planning and implementation of the IRRS missions in the longer term were discussed. A strong commitment of all relevant national authorities to the IRRS programme was identified as a key element of an effective regulatory framework. The conclusions of the workshop will be issued in November 2011 and the main results will be reported to the IAEA

  19. DIFFERENT DIMENSIONS OF TEAMS

    OpenAIRE

    Goparaju Purna SUDHAKAR

    2013-01-01

    Popularity of teams is growing in 21st Century. Organizations are getting their work done through different types of teams. Teams have proved that the collective performance is more than the sum of the individual performances. Thus, the teams have got different dimensions such as quantitative dimensions and qualitative dimensions. The Quantitative dimensions of teams such as team performance, team productivity, team innovation, team effectiveness, team efficiency, team decision making and tea...

  20. Impact on diabetes management of General Practice Management Plans, Team Care Arrangements and reviews.

    Science.gov (United States)

    Wickramasinghe, Leelani K; Schattner, Peter; Hibbert, Marienne E; Enticott, Joanne C; Georgeff, Michael P; Russell, Grant M

    2013-08-19

    To investigate whether General Practice Management Plans (GPMPs), Team Care Arrangements (TCAs) and reviews of these improve the management and outcomes of patients with diabetes when supported by cdmNet, a web-based chronic disease management system; and to investigate adherence to the annual cycle of care (ACOC), as recommended in diabetes guidelines. A before-and-after study to analyse prospectively collected data on 577 patients with type 1 or 2 diabetes mellitus who were managed with a GPMP created using cdmNet between June 2008 and November 2012. Completion of the clinical tests in the ACOC (process outcome) and values of six of these clinical measurements (clinical outcomes). Significant improvements were seen after creation of a GPMP in the proportion of ACOC clinical tests completed (57.9% v 74.8%, P < 0.001), total cholesterol level (P < 0.01), low-density lipoprotein (LDL) cholesterol level (P < 0.001) and body mass index (BMI) (P < 0.01). Patients using GPMPs and TCAs also improved their glycated haemoglobin (HbA1c) level (P < 0.05). Patients followed up with irregular reviews had significant improvements in the proportion of ACOC clinical tests completed (59.2% v 77.6%, P < 0.001), total cholesterol level (P < 0.05), and BMI (P < 0.01), but patients with regular reviews had greater improvements in the proportion of ACOC clinical tests completed (58.9% v 85.0%, P < 0.001), HbA(1c) level (57.7 v 53.0 mmol/mol, P < 0.05), total cholesterol level (4.8 v 4.5 mmol/L, P < 0.05), LDL cholesterol level (2.8 v 2.4 mmol/L, P < 0.01) and diastolic blood pressure (76.0 v 74.0 mmHg, P < 0.05). There were significant improvements in process and clinical outcomes for patients on a GPMP or a GPMP and TCA, particularly when these were followed up by regular reviews. Patients using cdmNet were four times more likely to have their GPMP or TCA followed up through regular reviews than the national average.