WorldWideScience

Sample records for restoration study project

  1. How to scientifically assess a restoration project: a case study

    Alvarez de Buergo, M.; Fort, R.; Freire, D. M.; Lopez-Arce, P.; Vazquez-Calvo, C.

    2012-04-01

    Commonly, it is said that there is lack of communication among scientists, conservators, restorers, project managers and architects. But sometimes this communication flows, and we can find enormous benefits from and for all the participating agents. This is the case we present in this work, in which technical agents in charge of the restoration of a building, asked for some scientific advice to perform the restoration of a heritage building. The results were successful and fantastic for both of them, in terms of one part asking for consultation and the other answering to the demands and resolving real problems. This is the case of a marvellous Renaissance building (Medinaceli Dukes palace, 15th-16th centuries) in the central area of Spain (Cogolludo, Guadalajara). Focused on the restoration project, we were asked for consultancy on how to solve matters like the assessment of the already fixed in project cleaning method for the stone façades, the efficacy and durability methods for some conservation products to be applied, the presence or not of a patina on the stone; the viability of using some restoration mortars, and the origin of some efflorescences that came out just after placed in the building a restoration rendering mortar. Responses to these matters were answered by performing tests both in the lab and on site in the building. The efficiency and effects on stone of the blasting cleaning method was assessed by first analysing the nature and thickness of the surface deposits to be removed (SEM-EDS analyses); secondly, roughness and colour measurements were performed, and thirdly, SEM-EDS analyses were carried out again to determine whether the cleaning method was able to remove part of the surface deposits, completely, or even part of the stone substrate. Some conservation products were tested on stone specimens, both their efficacy and their durability, concluding that it was better not to apply any of them. A patina was found on the stone façade under SEM

  2. Revitalisation of Orlík reservoir – case study of a regional restoration project

    Ivana Očásková

    2014-06-01

    Full Text Available This case study describes the bottom-up formation of a regional project for restoring a reservoir. Land use changes in the upper Vltava river basin caused the eutrophication of Orlík reservoir, which resulted in water blooms, which in association with socio-economic changes caused a decline in tourism in this region and serious difficulties for local people. The study examines how public awareness helped in the establishment of a restoration project, its framework and strategy. Regional governance of the project management took into consideration both knowledge-based solutions and the interests of local people and municipalities. The project has the potential for resolving both environmental and socio-economic problems and providing a sustainable win-win strategy for the region, residents, tourists and stakeholders.

  3. Case Study Application of the Biodiversity Security Index to Ranking Feasibility Studies for Ecosystem Restoration Projects of the U.S. Army Corps of Engineers

    2016-04-01

    ER D C/ EL C R- 16 -1 Ecosystem Management and Restoration Research Program Case Study Application of the Biodiversity Security Index... Biodiversity Security Index to Ranking Feasibility Studies for Ecosystem Restoration Projects of the U.S. Army Corps of Engineers Richard A. Cole... Biodiversity Security Index (BSI) was applied to 23 project sites ranked for restoration feasibility study annual funding by the U. S. Army Corps of

  4. Environmental Restoration Program pollution prevention checklist guide for the feasibility study project phase

    1993-09-01

    Feasibility studies (FS) determine what remedial alternatives are presented to regulators for site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best remedial option. The purpose of this checklist guide is to assist the user in incorporating pollution prevention/waste minimization (PP/WM) in all FS phase projects of the Environmental Restoration (ER) Program. This guide will help users document PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  5. Poplar Island Environmental Restoration Project Nekton Data

    National Oceanic and Atmospheric Administration, Department of Commerce — The Poplar Island Environmental Restoration Project (PIERP) is a large scale 1,800 acres restoration project located in mid Chesapeake Bay. Fishery collections are...

  6. Environmental restoration project configuration control

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  7. Phase 1 studies summary of major findings of the South Bay Salt Pond Restoration Project, South San Francisco Bay, California

    Valoppi, Laura

    2018-04-02

    Wildlife, the Santa Clara Valley Water District, the U.S. Army Corps of Engineers, and the U.S. Fish and Wildlife Service.To implement the AMP, the PMT have selected and funded applied studies and monitoring projects to address key uncertainties. This information is used by the PMT to make decisions about current management of the project area and future restoration actions in order to meet project.This document summarizes the major scientific findings from studies conducted from 2009 to 2016, as part of the science program that was conducted in conjunction with Phase 1 restoration and management actions. Additionally, this report summarizes the management response to the study results under the guidance of the AMP framework and provides a list of suggested studies to be conducted in “Phase 2–A scorecard summarizing the Project’s progress toward meeting the AMP goals for a range of Project objectives.” The scoring to date indicates that the Project is meeting or exceeding expectations for sediment accretion and western snowy plover (Charadrius alexandrinus nivosus) recovery. There is uncertainty with respect to objectives for California gulls (Larus californicus), California least tern (Sternula antillarum), steelhead trout (Oncorhynchus mykiss), and regulatory water quality objectives. Water quality and algal blooms, specifically of the managed ponds, is indicated as trending negative. However, the vast majority of objectives are trending positive, including increased abundance for a number of bird guilds, increasing marsh habitat, maintenance of mudflats, visitor experience, estuarine fish numbers, and special-status marsh species numbers.

  8. Lower Red River Meadow Stream Restoration Project

    1996-05-01

    As part of a continuing effort to restore anadromous fish populations in the South Fork Clearwater River basin of Idaho, Bonneville Power Administration (BPA) proposes to fund the Lower Red River Meadow Restoration Project (Project). The Project is a cooperative effort with the Idaho Soil and Water Conservation District, Nez Perce National Forest, Idaho Department of Fish and Game (IDFG), and the Nez Perce Tribe of Idaho. The proposed action would allow the sponsors to perform stream bank stabilization, aquatic and riparian habitat improvement activities on IDFG's Red River Management Area and to secure long-term conservation contracts or agreements for conducting streambank and habitat improvement activities with participating private landowners located in the Idaho County, Idaho, study area. This preliminary Environmental Assessment (EA) examines the potential environmental effects of stabilizing the stream channel, restoring juvenile fish rearing habitat and reestablishing a riparian shrub community along the stream

  9. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  10. Landscaping Considerations for Urban Stream Restoration Projects

    Bailey, Pam

    2004-01-01

    ... after restoration and its functionality for public use. The landscaping component of such stream and riparian restoration projects must be emphasized given its importance of visual success and public perception. The purpose of this technical note is to address landscaping considerations associated with urban stream and riparian restoration projects, and provide ideas to managers for enhancing the visual appeal and aesthetic qualities of urban projects.

  11. Project Rio Blanco: site restoration. Final report

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  12. Deer Island Aquatic Ecosystem Restoration Project

    2015-07-01

    across the U.S. Army Corps of Engineers (USACE) requires that a broad base of EWN understanding and support be built . The Deer Island Aquatic...USACE) requires that a broad base of EWN understanding and support be built . The Deer Island Aquatic Ecosystem Restoration Project (Deer Island AERP...Mississippi Wetlands Restoration Projects). The project received additional funding through several public laws in response to hurricane damages

  13. Integrating ecological restoration into CDM forestry projects

    Ma, Maohua; Haapanen, Toni; Singh, Ram Babu; Hietala, Reija

    2014-01-01

    Highlights: • Concerns and issues in sustainability of CDM forestry projects are reviewed. • Ecological restoration is suggested to be integrated in the CDM framework. • As an ecosystem supporting service, soil restoration on degraded land is of primary importance. • Regenerating forests naturally rather than through monoculture plantations is suggested. • Potential social impacts of ecological restoration are discussed. - Abstract: The Clean Development Mechanism (CDM) is proposed to reduce greenhouse gas emissions and promote sustainable development. CDM forestry projects should contribute to mitigation of climate change through afforestation and reforestation (A/R) activities on degraded land in developing countries. However, like other types of CDM projects, the forestry projects have encountered a number of concerns and critiques. Appropriate approaches and concrete aims to achieve long-term sustainability have been lacking, and reforms have therefore been called for. The aims of this paper are to examine the published information relevant to these concerns, and frame appropriate approaches for a more sustainable CDM. In this review, as a first step to tackle some of these issues, ecological restoration is suggested for integration into the CDM framework. Essentially, this involves the restoration of ecosystem supporting service (soil restoration), upon which forests regenerate naturally rather than establishing monoculture plantations. In this way, forestry projects would bring cost-effective opportunities for multiple ecosystem services. Potential approaches, necessary additions to the monitoring plans, and social impacts of ecological restoration in CDM projects are discussed

  14. Fisheries Restoration Grant Program Projects [ds168

    California Natural Resource Agency — This shapefile (FRGP_All_020209.shp) represents the locations of all ongoing and completed salmonid restoration projects in California with existing records in the...

  15. Uranium mining environmental restoration project (PRAMU)

    Asenjo, A.

    2002-01-01

    The National Atomic Energy Commission (CNEA) started its activities 50 years ago and obtained significant results. At the present time, the CNEA is defined as an Institution of research and development in the nuclear field. It is also responsible for the management of radioactive wastes and the dismantling of nuclear and radioactive facilities. Mining and milling activities have been carried out during the past 40 years and at present the CNEA is undertaking the Uranium Mining Environmental Restoration Project (PRAMU). The aim of this project is to restore the environment as much as is possible in all places where uranium mining and milling activities were developed when taking into consideration both economic and technical reality. First, the characteristics of the problems in each site are determined through appropriate studies which identify the existing or potential impacts, the possible pathways of contamination, etc. The sites being studied are: MALARGUE (Mendoza Province), CORDOBA (Cordoba Province), LOS GIGANTES (Cordoba Province), HUEMUL (Mendoza Province), PICHINAN (Chubut Province), TONCO (Salta Province), LA ESTELA (San Luis Province), LOS COLORADOS (La Rioja Province). PRAMU seeks to improve the current conditions of the tailings deposits and mines and to ensure the long term protection of people and the environment. The CNEA is required to comply with all legislation that is in force and is under the control of various national, provincial and local State institutions. The main objectives of the project for the various sites are: (a) Malargue site: to implement the actions necessary for environmental restoration and management of the tailings derived from the uranium ores processed in the industrial plant; (b) Cordoba and Los Gigantes sites: to design, engineer and execute the activities required for closure of the sites; (c) Other sites (Huemul, Pichinan, Tonco, La Estela, Los Colorados): to develop an environmental evaluation and, on the basis of

  16. Prioritization of Forest Restoration Projects: Tradeoffs between Wildfire Protection, Ecological Restoration and Economic Objectives

    Kevin C. Vogler

    2015-12-01

    Full Text Available The implementation of US federal forest restoration programs on national forests is a complex process that requires balancing diverse socioecological goals with project economics. Despite both the large geographic scope and substantial investments in restoration projects, a quantitative decision support framework to locate optimal project areas and examine tradeoffs among alternative restoration strategies is lacking. We developed and demonstrated a new prioritization approach for restoration projects using optimization and the framework of production possibility frontiers. The study area was a 914,657 ha national forest in eastern Oregon, US that was identified as a national priority for restoration with the goal of increasing fire resiliency and sustaining ecosystem services. The results illustrated sharp tradeoffs among the various restoration goals due to weak spatial correlation of forest stressors and provisional ecosystem services. The sharpest tradeoffs were found in simulated projects that addressed either wildfire risk to the urban interface or wildfire hazard, highlighting the challenges associated with meeting both economic and fire protection goals. Understanding the nature of tradeoffs between restoration objectives and communicating them to forest stakeholders will allow forest managers to more effectively design and implement economically feasible restoration projects.

  17. Restoration of areas disturbed by site studies for a mined commercial radioactive waste repository: The Basalt Waste Isolation Project [BWIP

    Brandt, C.A.; Rickard, W.H. Jr.; Biehert, R.W.; Newell, R.L.; Page, T.L.

    1989-01-01

    The Basalt Waste Isolation Project (BWIP) was undertaken to environmentally characterize a portion of the US Department of Energy's Hanford Site in Washington State as a potential host for the nation's first mined commercial nuclear waste repository. Studies were terminated by Congress in 1987. Between 1976 and 1987, 72 areas located across the Hanford Site were disturbed by the BWIP. These areas include borehole pads, a large Exploratory Shaft Facility, and the Near Surface Test Facility. Most boreholes were cleared of vegetation, leveled, and stabilized with a thick layer of compacted pit-run gravel and sand. The Near Surface Test Facility consists of three mined adits, a rock-spoils bench, and numerous support facilities. Restoration began in 1988 with the objective of returning sites to pre-existing conditions using native species. The Hanford Site retains some of the last remnants of the shrub-steppe ecosystem in Washington. The primary constraints to restoring native vegetation at Hanford are low precipitation and the presence of cheatgrass, an extremely capable alien competitor. 5 figs

  18. South Texas Native Plant Restoration Project

    2012-10-01

    The South Texas Native Plant Restoration Project was a resounding success in that the primary goal of : developing commercial sources of native seed has been substantially met. By the conclusion of the project : on August 31, 2011, 20 native seed sou...

  19. Leadership success within disaster restoration projects.

    Rapp, Randy R; Baroudi, Bassam

    2014-01-01

    Successful project managers draw their performance from essential leadership traits, as guided by their core values.Within disaster recovery, contractors who mitigate, repair, and reconstruct the built environment are often faced with challenges exceeding the norm. The effective leader is commonly expected to consider stakeholder motivations within distressing situations as well as other external and environmental factors when seeking to lead the project team to successful outcomes. This research is most concerned with leadership within the context of disaster restoration of the built environment. Its stimulus comes from the Restoration Industry Association (RIA)'s efforts to highlight leadership traits and core values for its Certified Restorer Body of Knowledge but would be of value to others associated with disaster recovery operations. Among organizations whose membership includes thousands of practitioners who restore and reconstruct the built environment after disasters, the RIA is the only one yet to formally and substantially research which core values and leader traits are deemed critical for the success of efforts to manage the means and methods applied on recovery job sites. Forty-six seasoned disaster restoration industry project professionals voluntarily responded to a survey questionnaire that sought their opinions about the traits and core values that they consider most important for successful disaster restoration project leadership. The most important leader traits were effective communication, professional competence, and leadership by example. The most important restoration industry values were integrity, compassion, and trustworthiness. The recognized imperative of compassion was unexpected in light of stereotypes often associated with construction-related contractors. This and other findings permit disaster response and recovery stakeholders to better understand qualities they should wish to see in leaders of contractor organizations, which

  20. Environmental Restoration Project - Systems Engineering Management Plan

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  1. Evaluating Stream Restoration Projects: What Do We Learn from Monitoring?

    Zan Rubin

    2017-02-01

    Full Text Available Two decades since calls for stream restoration projects to be scientifically assessed, most projects are still unevaluated, and conducted evaluations yield ambiguous results. Even after these decades of investigation, do we know how to define and measure success? We systematically reviewed 26 studies of stream restoration projects that used macroinvertebrate indicators to assess the success of habitat heterogeneity restoration projects. All 26 studies were previously included in two meta-analyses that sought to assess whether restoration programs were succeeding. By contrast, our review focuses on the evaluations themselves, and asks what exactly we are measuring and learning from these evaluations. All 26 studies used taxonomic diversity, richness, or abundance of invertebrates as biological measures of success, but none presented explicit arguments why those metrics were relevant measures of success for the restoration projects. Although changes in biodiversity may reflect overall ecological condition at the regional or global scale, in the context of reach-scale habitat restoration, more abundance and diversity may not necessarily be better. While all 26 studies sought to evaluate the biotic response to habitat heterogeneity enhancement projects, about half of the studies (46% explicitly measured habitat alteration, and 31% used visual estimates of grain size or subjectively judged ‘habitat quality’ from protocols ill-suited for the purpose. Although the goal of all 26 projects was to increase habitat heterogeneity, 31% of the studies either sampled only riffles or did not specify the habitats sampled. One-third of the studies (35% used reference ecosystems to define target conditions. After 20 years of stream restoration evaluation, more work remains for the restoration community to identify appropriate measures of success and to coordinate monitoring so that evaluations are at a scale capable of detecting ecosystem change.

  2. Adaptively Addressing Uncertainty in Estuarine and Near Coastal Restoration Projects

    Thom, Ronald M.; Williams, Greg D.; Borde, Amy B.; Southard, John A.; Sargeant, Susan L.; Woodruff, Dana L.; Laufle, Jeffrey C.; Glasoe, Stuart

    2005-03-01

    Act; CWPPRA) have incorporated very specific and detailed elements in a more active adaptive management effort. In Puget Sound, the Puget Sound Action Team uses site-specific case studies, monitoring, and public involvement to direct actions to reduce microbial contamination of harvestable shellfish. Small-scale projects can also be improved through application of adaptive management. For example, directed research and site assessments resulted in successful restoration of seagrasses near a ferry terminal in Puget Sound. It is recommended that all restoration programs be conducted in an adaptive management framework, and where appropriate, a more active adaptive management approach be applied. The net effect should be less uncertainty, improved project success, advancement of the science of restoration, and cost savings.

  3. Management systems for environmental restoration projects

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  4. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  5. Sears Point Tidal Marsh Restoration Project: Phase I

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase I project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  6. Contrasting the roles of section length and instream habitat enhancement for river restoration success: a field study on 20 European restoration projects

    Hering, D.; Aroviita, J.; Baattrup-Pedersen, A.; Brabec, K.; Buijse, T.; Ecke, F.; Friberg, N.; Gielczewski, Marek; Januschke, K.; Köhler, J.; Kupilas, Benjamin; Lorenz, A.W.; Muhar, S.; Paillex, Amael; Poppe, Michaela; Schmidt, T.; Schmutz, S.; Vermaat, J.; Verdonschot, R.C.M.; Verdonschot, P.F.M.; Wolter, Christian; Kail, J.

    2015-01-01

    1. Restoration of river hydromorphology often has limited detected effects on river biota. One frequently discussed reason is that the restored river length is insufficient to allow populations to develop and give the room for geomorphologic processes to occur. 2. We investigated ten pairs of

  7. The Development of the Comic Spirit in 17th Century England from James Shirley to William Congreve. Curriculum Projects, April 7-June 16, 1992. The Huntington Theatre Company Master Works Study in Restoration Comedy.

    Huntington Theatre Co., Boston, MA.

    Developed by the participants of the Huntington Theatre Company's Master Works Study in Restoration Comedy, this collection presents one-day lesson plans and curriculum projects for teaching Restoration comedy. The collection offers 15 one-day lesson plans and 15 curriculum projects (ranging over several weeks) suitable for secondary school…

  8. Projecting the success of plant restoration with population viability analysis

    Bell, T.J.; Bowles, M.L.; McEachern, A.K.; Brigham, C.A.; Schwartz, M.W.

    2003-01-01

    Conserving viable populations of plant species requires that they have high probabilities of long-term persistence within natural habitats, such as a chance of extinction in 100 years of less than 5% (Menges 1991, 1998; Brown 1994; Pavlik 1994; Chap. 1, this Vol.). For endangered and threatened species that have been severely reduces in range and whose habitats have been fragmented, important species conservation strategies may include augmenting existing populations or restoring new viable populations (Bowles and Whelan 1994; Chap. 2, this Vol.). Restoration objectives may include increasing population numbers to reduce extinction probability, deterministic manipulations to develop a staged cohort structure, or more complex restoration of a desired genetic structure to allow outcrossing or increase effective population size (DeMauro 1993, 1994; Bowles et al. 1993, 1998; Pavlik 1994; Knapp and Dyer 1998; Chap. 2, this Vol.). These efforts may require translocation of propagules from existing (in situ) populations, or from ex situ botanic gardens or seed storage facilities (Falk et al. 1996; Guerrant and Pavlik 1998; Chap. 2, this Vol.). Population viability analysis (PVA) can provide a critical foundation for plant restoration, as it models demographic projections used to evaluate the probability of population persistence and links plant life history with restoration strategies. It is unknown how well artificially created populations will meet demographic modeling requirements (e.g., due to artificial cohort transitions) and few, if any, PVAs have been applied to restorations. To guide application of PVA to restored populations and to illustrate potential difficulties, we examine effects of planting different life stages, model initial population sizes needed to achieve population viability, and compare demographic characteristics between natural and restored populations. We develop and compare plant population restoration viability analysis (PRVA) case studies of

  9. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  10. Sears Point Tidal Marsh Restoration Project: Phase II

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase II, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  11. Emerson Parcel of Dutch Slough Tidal Marsh Restoration Project

    Information about the SFBWQP Emerson Parcel of Dutch Slough Tidal Marsh Restoration Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  12. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    2013-05-03

    ...-100-00-0-0, CUPCA00] Central Utah Project Completion Act; East Hobble Creek Restoration Project Final... Creek Restoration Project. These two agencies have determined that the proposed [[Page 26064

  13. Prioritization of forest restoration projects: Tradeoffs between wildfire protection, ecological restoration and economic objectives

    Kevin C. Vogler; Alan A. Ager; Michelle A. Day; Michael Jennings; John D. Bailey

    2015-01-01

    The implementation of US federal forest restoration programs on national forests is a complex process that requires balancing diverse socioecological goals with project economics. Despite both the large geographic scope and substantial investments in restoration projects, a quantitative decision support framework to locate optimal project areas and examine...

  14. Incorporating climate change projections into riparian restoration planning and design

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  15. 75 FR 6354 - NOAA Great Lakes Habitat Restoration Program Project Grants under the Great Lakes Restoration...

    2010-02-09

    ...-04] RIN 0648-ZC10 NOAA Great Lakes Habitat Restoration Program Project Grants under the Great Lakes... Atmospheric Administration (NOAA), Department of Commerce. ACTION: Notice of funding availability; Date... on January 19, 2010. That notice announced the NOAA Great Lakes Habitat Restoration Program Project...

  16. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  17. Social Science Methods Used in the RESTORE Project

    Lynne M. Westphal; Cristy Watkins; Paul H. Gobster; Liam Heneghan; Kristen Ross; Laurel Ross; Madeleine Tudor; Alaka Wali; David H. Wise; Joanne Vining; Moira. Zellner

    2014-01-01

    The RESTORE (Rethinking Ecological and Social Theories of Restoration Ecology) project is an interdisciplinary, multi-institutional research endeavor funded by the National Science Foundation's Dynamics of Coupled Natural Human Systems program. The goal of the project is to understand the links between organizational type, decision making processes, and...

  18. Richland Environmental Restoration Project management action process document

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  19. Richland Environmental Restoration Project management action process document

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  20. Metro Multnomah Wetlands - Multnomah Channel Wetland Restoration Monitoring Project

    National Oceanic and Atmospheric Administration, Department of Commerce — The Multnomah Channel Wetland Restoration Monitoring Project characterizes wetlands use by juvenile salmonids and other fishes in the Multnomah Channel Marsh Natural...

  1. A Function-Based Framework for Stream Assessment & Restoration Projects

    This report lays out a framework for approaching stream assessment and restoration projects that focuses on understanding the suite of stream functions at a site in the context of what is happening in the watershed.

  2. HBIM for restoration projects: case-study on San Cipriano Church in Castelvecchio Calvisio, Province of L’Aquila, Italy.

    Romolo Continenza

    2016-06-01

    Full Text Available Although there have been significant developments in research into assigning semantic content to 3D models for the purposes of documentation, conservation and architectural and archaeological heritage management, the application of 3D GIS to individual artifacts has remained rare. Where 3D GIS has been used in this context, it has not been done in a consistent or standardised way.As an alternative to the elaborate construction of 3D GIS, the international academic community has embarked on a process of investigating how HBIM (Historical BIM might be used in the fields of historical architecture and archaeology.In this paper, we report on experiments carried out at the San Cipriano Church in Castelvecchio Calvisio, Province of L’Aquila, Italy, on the basis of the integrated survey of the church, before turning to a discussion of the planning of restoration work in a BIM environment.

  3. Managing trade-offs in landscape restoration and revegetation projects.

    Maron, Martine; Cockfield, Geoff

    2008-12-01

    Landscape restoration projects often have multiple and disparate conservation, resource enhancement, and sometimes economic objectives, since projects that seek to meet more than one objective tend to be viewed more positively by funding agencies and the community. The degree to which there are trade-offs among desired objectives is an important variable for decision makers, yet this is rarely explicitly considered. In particular, the existence of ecological thresholds has important implications for decision-making at both the project level and the regional level. We develop a model of the possibilities and choices for an agency seeking to achieve two environmental objectives in a region through revegetation of a number of sites. A graphical model of the production possibilities sets for a single revegetation project is developed, and different trade-off relationships are discussed and illustrated. Then the model is used to demonstrate the possibilities for managing all such projects within a region. We show that, where there are thresholds in the trade-off relationship between two objectives, specialization (single- or dominant-objective projects) should be considered. This is illustrated using a case study in which revegetation is used to meet avian biodiversity and salinity mitigation objectives. We conclude that where there are sufficient scientific data, explicit consideration of different types of trade-offs can assist in making decisions about the most efficient mix and type of projects to better achieve a range of objectives within a region.

  4. Subtidal Bathymetric Changes by Shoreline Armoring Removal and Restoration Projects

    Wallace, J.

    2016-12-01

    The Salish Sea, a region with a diverse coastline, is altered by anthropogenic shoreline modifications such as seawalls. In recent years, local organizations have moved to restore these shorelines. Current research monitors the changes restoration projects have on the upper beach, lower beach, and intertidal, however little research exists to record possible negative effects on the subtidal. The purpose of this research is to utilize multibeam sonar bathymetric data to analyze possible changes to the seafloor structure of the subtidal in response to shoreline modification and to investigate potential ecosystem consequences of shoreline alteration. The subtidal is home to several species including eelgrass (Zostera marina). Eelgrass is an important species in Puget Sound as it provides many key ecosystem functions including providing habitat for a wide variety of organisms, affecting the physics of waves, and sediment transport in the subtidal. Thus bathymetric changes could impact eelgrass growth and reduce its ability to provide crucial ecosystem services. Three Washington state study sites of completed shoreline restoration projects were used to generate data from areas of varied topographic classification, Seahurst Park in Burien, the Snohomish County Nearshore Restoration Project in Everett, and Cornet Bay State Park on Whidbey Island. Multibeam sonar data was acquired using a Konsberg EM 2040 system and post-processed in Caris HIPS to generate a base surface of one-meter resolution. It was then imported into the ArcGIS software suite for the generation of spatial metrics. Measurements of change were calculated through a comparison of historical and generated data. Descriptive metrics generated included, total elevation change, percent area changed, and a transition matrix of positive and negative change. Additionally, pattern metrics such as, surface roughness, and Bathymetric Position Index (BPI), were calculated. The comparison of historical data to new data

  5. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  6. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie, bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.

  7. The passive river restoration approach as an efficient tool to improve the hydromorphological diversity of rivers - Case study from two river restoration projects in the German lower mountain range

    Groll, M.

    2017-09-01

    Intensive use of European rivers during the last hundreds of years has led to profound changes in the physicochemical properties, river morphology, and aquatic faunistic communities. Rectifying these changes and improving the ecological state of all surface water bodies is the central aim of the European Water Frame Directive (WFD), and river restoration measures are the main tool to achieve this goal for many rivers. As the cost-effectiveness of all measures is crucial to the WFD implementation, the approach of the passive river restoration has become very popular over the last decades. But while costs of this approach are minimal, not much is known about the long-term effectiveness of passive river restorations. The research presented here provides essential and in-depth data about the effects of two such restoration measures on the riverbed morphology of a large river of the lower mountain region in Germany (type 9.2). More than 3200 data sets were acquired using the TRiSHa method (Typology of Riverbed Structures and Habitats). The results show a high spatial and temporal diversity and dynamic for all analyzed hydromorphologic parameters - ranging from riverbed sediments, organic structures like dead wood or macrophytes, to the distribution of 32 microhabitat types. The structures and their dynamic depend on the character of the study area (free-flowing or impounded), the location of the study sites within the research area (main channel or restored side channel), and on the occurrence of major flood events (the mapping and sampling were conducted annually from 2006 to 2008 with a 50-year flood event occurring in early 2007). These results show the potential of the passive restoration approach for creating morphologically diverse riverbeds, as habitat diversity and the spatial heterogeneity of the riverbed substrates increased significantly (e.g., more than 40% of all habitat types were only detected in the newly restored side channels). But the results also

  8. The Carolina Bay Restoration Project - Final Report 2000-2006.

    Barton, Christopher

    2007-12-15

    A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report.

  9. Project studies

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  10. Emergency Fish Restoration Project; Final Report 2002.

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  11. Integrated modeling for the restoration project management

    Roberto Mingucci

    2012-11-01

    Full Text Available This paper introduces some possibilities offered by the Information Multimedia Archives (A.I.M., methodology aimed at existing architectures and important historic monuments documentation. The A.I.M.’s generation process and its digital archive structure result from studies on digital modeling and computer vision intended to document informative surveys, produced during two distinct acquiring and compiling phases. The data is collected in the A.I.M. through increasing levels of detail and organized through the use of databases developed in order to be queried by mobile devices too.

  12. Mummy Restoration Project Among the Anga of Papua New Guinea.

    Beckett, Ronald G; Nelson, Andrew J

    2015-06-01

    We report on a unique Mummy restoration project among the anga of papua new guinea. Moimango was a village leader who had gone through the smoked body mummification process about 50 years ago. His smoked body has been displayed, alongside other ancestors, on a cliff niche gallery 308 m (1011 feet) above Koke Village. Although somewhat protected by an overhang, Moimango suffered a great deal of deterioration as he has been unprotected and exposed to the elements. The goals of our 2010 expedition to Koke Village was to assess the efficacy of restoration efforts applied to Moimango initiated by the authors and villagers of Koke in 2008. The restoration process used materials native to the local jungles. We examined Moimango for additional restoration challenges that may have arisen since the 2008 expedition. We discovered that many of the restoration techniques developed and applied in 2008 held up well. We found that the anatomical supports developed from native tapa and kumaka sap were still in place and effective, as well as our lichen eradication method of a suca slurry applied in 2008. Of particular importance was the stability of Moimago's head, which prior to restoration, was held in place by only the mummified muscle and integument of the lateral and posterior neck region. Endoscopic evaluation demonstrated disarticulated C1 and C2 vertebrae. New restoration challenges included construction of a new display chair, realignment and securing of the mandible, replacing and securing a loose tooth, repatching, and recoating with ritualistic red ochre clay. © 2015 Wiley Periodicals, Inc.

  13. Results From a Channel Restoration Project: Hydraulic Design Considerations

    Karle, K.F.; Densmore, R.V.; ,

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  14. Strategic Environmental Research and Development Project FY 1994: Assessing national remote sensing technologies for use in US Department of Energy Environmental Restoration Activities, Oak Ridge Solid Waste Storage Area 4 case study

    King, A.L.; Smyre, J.L.; Evers, T.K.

    1995-02-01

    During FY 1994, the Oak Ridge Environmental Restoration (ER) Remote Sensing Program teamed with members of the Oak Ridge National Security Program Office (NSPO), the Environmental Research Institute of Michigan (ERIM) under contract to the National Exploitation Laboratory (NEL), the Oak Ridge Waste Area Group 4 (WAG 4) ER Program, and the US Department of Energy (DOE), Offices of Technology Development, Nonproliferation and National Security, and Environmental Restoration, to conduct a test and demonstration of the uses of national remote sensing technologies at DOE hazardous waste sites located in Oak Ridge, Tennessee. Objectives of the Oak Ridge study were to determine if national remote sensing technologies are useful in conducting prescreening, characterization, and/or monitoring activities to expedite the clean-up process at hazardous waste sites and to cut clean-up costs wherever possible. This project was sponsored by the Strategic Environmental Research and Development Project (SERDP)

  15. Assessment of restoration measures efficiency for soil contamination in Mediterranean Ecosystem. The case study of Guadiamar Green Corridor in the context of RECARE project

    Anaya-Romero, Maria; José Blanco-Velázquez, Francisco; Muñoz-Vallés, Sara

    2017-04-01

    Restoration of soil ecosystems contaminated by heavy metals requires their characterization and the assessment of measures for risk reduction. Particular soil traits and history define different levels of resilience, so soil contamination assessment needs to take into account a site-by-site approach, which considers both the particular environmental characteristics of soils and the human activities. Nevertheless, current approaches for soil contamination assessment developed as academy and market solutions continue to be rather qualitative, and they do not allow as far the selection of efficient remediation measures to solve soil contamination at the long-term and extensively over larger áreas. In this context, under the framework of RECARE (Preventing and Remediating degradation of Soils in Europe through Land Care) project, we are designing a Decision Support System (DSS) which automatically assess soil contamination values by heavy metals in the topsoil and evaluate the efficiency of soil remediation measures under scenarios of climate and land-use change. The DSS works by simulating the spatio-temporal efficiency of three widely applied remediation measures (compost, sugar beet lime and iron-rich clayey materials). Input variables are divided into: (I) climate variables (mainly precipitation and temperature), (II) site variables (elevation, slope and erodibility), (III) soil (heavy metal content, pH, sand/clay content, soil organic carbon and bulk density), (IV) land use and (V) remediation measures. The predictor variables are related to soil functions expressed by % of change of heavy metal content (Currently the DSS consider cadmium dynamics due to the worldwide distribution in agricultural system and toxicity impact on health and plants), soil carbon and erosion dynamics. The pilot study area is the Guadiamar valley (SW Spain) where the main threat is soil contamination, after a mine spill occurred on April 1998. Since that time, a huge soil databse of

  16. Exxon Valdez Oil Spill Restoration Project final report: Monitoring for evaluation of recovery and restoration of injured nearshore resources

    Ballachey, Brenda E.; Bodkin, James L.; Kloecker, Kim; Dean, Tom; Colettie, Heather A

    2015-01-01

    In 2012, we completed three consecutive years of full field sampling in WPWS for EVOS Restoration Project 10100750. Nearshore monitoring was conducted in collaboration with the NPS SWAN I&M program and, beginning in 2012, as part of the EVOSTC GWA program. Data collection was done in accordance with standard operating procedures set forth to monitor marine water chemistry and quality, marine intertidal invertebrates, kelps and seagrasses, marine birds, black oystercatchers, and sea otters. Summer sampling in 2012 represented the fourth year of sampling in WPWS (an initial year of sampling was done in WPWS in 2007; EVOS Restoration Project 070750). Based on our monitoring of nearshore species in WPWS, and comparisons of data from WPWS and other areas within the Gulf of Alaska, we have no evidence of continued injury to biological resources at the spatial scales we are monitoring. A key finding is that recovery of the sea otter population is no longer constrained by exposure to lingering oil; this is consistent with related EVOSTC studies on harlequin ducks (Restoration Project 12120114-Q). We anticipate continued annual nearshore monitoring in WPWS and at KATM and KEFJ under GWA, with data summaries and analyses including all three areas to provide a larger spatial and temporal context to the understanding of processes and patterns in nearshore ecosystems of the GOA which were impacted by the EVOS of 1989.

  17. Hydrodynamic Modeling Analysis to Support Nearshore Restoration Projects in a Changing Climate

    Zhaoqing Yang

    2014-01-01

    Full Text Available To re-establish the intertidal wetlands with full tidal exchange and improve salmonid rearing habitat in the Skagit River estuary, State of Washington, USA, a diked agriculture farm land along the Skagit Bay front is proposed to be restored to a fully functional tidal wetland. The complex and dynamic Skagit River estuarine system calls for the need of a multi-facet and multi-dimensional analysis using observed data, numerical and analytical methods. To assist the feasibility study of the restoration project, a hydrodynamic modeling analysis was conducted using a high-resolution unstructured-grid coastal ocean model to evaluate the hydrodynamic response to restoration alternatives and to provide guidance to the engineering design of a new levee in the restoration site. A set of parameters were defined to quantify the hydrodynamic response of the nearshore restoration project, such as inundation area, duration of inundation, water depth and salinity of the inundated area. To assist the design of the new levee in the restoration site, the maximum water level near the project site was estimated with consideration of extreme high tide, wind-induced storm surge, significant wave height and future sea-level rise based on numerical model results and coastal engineering calculation.

  18. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005

    Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

    2006-12-20

    This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

  19. From repairing the damaged landscape to restoration project

    Céline Granjou

    2010-10-01

    Full Text Available The study adopts an empirical sociological approach to analyse how the objectives behind the revegetation of ski trails and runs in the French alpine resort of Alpe d’Huez have evolved since the 1970s. A revegetation programme was first introduced to repair the scars left by the works conducted to equip the resort with infrastructures, and then, over time, it became a more complex restoration project. At first, revegetation techniques were developed to fight soil erosion, but soon also became associated with the idea of “turning the mountain green again”. Now, 40 years later, revegetation is aimed at restoring both a natural ecosystem and a cultural landscape. The ski resort’s managers, local farmers, technicians, and those conducting research in the area share a common desire to promote autochthony, which in some cases runs the risk of reproducing folklore. Far from adopting an overriding ethical perspective, the study suggests that the area’s physical characteristics, specific history and configuration of local actors have shaped and continue to shape both the manner in which ecological restoration is implemented, through political choices and technical decisions, and the debates it gives rise to. The study concludes by examining the specificity of the findings for Alpe d’Huez and discussing their validity for other alpine ski resorts.A partir d’une approche sociologique empirique, ce texte propose une analyse de la mise en œuvre de la revégétalisation sur la station de l’Alpe d’Huez depuis les années 1970. Il montre comment la revégétalisation est passée d’un objectif de réparation des cicatrices provoquées par les aménagements à une entreprise plus complexe de restauration. S’il s’agissait au départ de répondre à un objectif technique de lutte contre l’érosion, la revégétalisation a pris rapidement une tournure paysagère (reverdissement ; elle a ensuite été pensée dans une perspective de

  20. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2004

    Diefenderfer, Heida L.; Roegner, Curtis; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Johnson, Gary E.; Sobocinski, Kathryn L.; Anderson, Michael G.; Ebberts, Blaine

    2005-12-15

    The restoration of wetland salmon habitat in the tidal portion of the Columbia River is occurring at an accelerating pace and is anticipated to improve habitat quality and effect hydrological reconnection between existing and restored habitats. Currently multiple groups are applying a variety of restoration strategies in an attempt to emulate historic estuarine processes. However, the region lacks both a standardized means of evaluating the effectiveness of individual projects as well as methods for determining the cumulative effects of all restoration projects on a regional scale. This project is working to establish a framework to evaluate individual and cumulative ecosystem responses to restoration activities in order to validate the effectiveness of habitat restoration activities designed to benefit salmon through improvements to habitat quality and habitat opportunity (i.e. access) in the Columbia River from Bonneville Dam to the ocean. The review and synthesis of approaches to measure the cumulative effects of multiple restoration projects focused on defining methods and metrics of relevance to the CRE, and, in particular, juvenile salmon use of this system. An extensive literature review found no previous study assessing the cumulative effects of multiple restoration projects on the fundamental processes and functions of a large estuarine system, although studies are underway in other large land-margin ecosystems including the Florida Everglades and the Louisiana coastal wetlands. Literature from a variety of scientific disciplines was consulted to identify the ways that effects can accumulate (e.g., delayed effects, cross-boundary effects, compounding effects, indirect effects, triggers and thresholds) as well as standard and innovative tools and methods utilized in cumulative effects analyses: conceptual models, matrices, checklists, modeling, trends analysis, geographic information systems, carrying capacity analysis, and ecosystem analysis. Potential

  1. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment

  2. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment.

  3. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Williams, C.V.; Burford, T.D.

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy's (DOE's) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID's technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID

  4. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

  5. The optimized baseline project: Reinventing environmental restoration at Hanford

    Goodenough, J.D.; Janaskie, M.T.; Kleinen, P.J.

    1994-01-01

    The U.S. Department of Energy Richland Operations Office (DOE-RL) is using a strategic planning effort (termed the Optimized Baseline Project) to develop a new approach to the Hanford Environmental Restoration program. This effort seeks to achieve a quantum leap improvement in performance through results oriented prioritization of activities. This effort was conducted in parallel with the renegotiation of the Tri-Party Agreement and provided DOE with an opportunity to propose innovative initiatives to promote cost effectiveness, accelerate progress in the Hanford Environmental Restoration Program and involve stakeholders in the decision-making process. The Optimized Baseline project is an innovative approach to program planning and decision-making in several respects. First, the process is a top down, value driven effort that responds to values held by DOE, the regulatory community and the public. Second, planning is conducted in a way that reinforces the technical management process at Richland, involves the regulatory community in substantive decisions, and includes the public. Third, the Optimized Baseline Project is being conducted as part of a sitewide Hanford initiative to reinvent Government. The planning process used for the Optimized Baseline Project has many potential applications at other sites and in other programs where there is a need to build consensus among diverse, independent groups of stakeholders and decisionmakers. The project has successfully developed and demonstrated an innovative approach to program planning that accelerates the pace of cleanup, involves the regulators as partners with DOE in priority setting, and builds public understanding and support for the program through meaningful opportunities for involvement

  6. A project to develop restoration methods for buildings and facilities after a terrorist attack

    Fingas, M.F. [Environment Canada, Ottawa, ON (Canada). Emergencies Science and Technology Div]|[Environment Canada, Ottawa, ON (Canada). River Road Environmental Technology Centre; Volchek, K.; Hornof, M.; Boudreau, L.; Punt, M. [SAIC Canada, Ottawa, ON (Canada); Payette, P.; Best, M. [Health Canada, Ottawa, ON (Canada); Garbutt, M.; Krishnan, J.; Wagener, S.; Bernard, K. [Health Canada, Winnipeg, MB (Canada); Cousins, T.; Haslip, D. [Defence Research and Development Canada, Ottawa, ON (Canada)

    2004-07-01

    A multi-agent project was initiated to review site restoration after a terrorist attack. The objective was to acquire and compile information on all known restoration procedures for buildings, exteriors of buildings, their interior contents, and adjacent areas such as parking lots, lawns and vehicles. All procedures were then tested and validated. Restoration procedures included pickup, neutralization, decontamination, removal and final destruction/deposition of the contaminant, cleaning material and contaminated debris resulting from the terrorist act. This research and development project considered chemical, biological and nuclear contamination with the intent to develop methods to decontaminate and restore buildings after a chemical, biological and radiological (CBR) attack. Ideas were collected from work conducted around the world. The efficacy of best candidates was tested along with all selected chemical target items. The project also involved the preparation of procedures for decontamination and restoration. Ultimately, a tradeoff decision basis will be developed to provide information on abandonment and quarantine versus cleanup. The study revealed that there are several technologies that can be used for the decontamination of structures and equipment after acts of terrorism, however, no one technique will work for all contaminants on all surfaces. The selection of a decontamination method depends on the contaminant, the surface being decontaminated and economic, social and health factors. The amount of waste generated by decontamination is a major feasibility factor. 25 refs., 6 tabs.

  7. Digital collection of aerial photographs from the Common Murre Restoration Project, 1997 (NODC Accession 0037159)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Common Murre Restoration Project is a comprehensive seabird restoration effort aimed at enhancing depleted seabird populations in central California,...

  8. Digital collection of aerial photographs from the Common Murre Restoration Project, 2005 (NODC Accession 0057025)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Common Murre Restoration Project is a comprehensive seabird restoration effort aimed at enhancing depleted seabird populations in central California,...

  9. Digital collection of aerial photographs from the Common Murre Restoration Project, 1998 (NODC Accession 0037160)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Common Murre Restoration Project is a comprehensive seabird restoration effort aimed at enhancing depleted seabird populations in central California,...

  10. 77 FR 65167 - Blacksmith Ecological Restoration Project, Eldorado National Forest, Placer and El Dorado...

    2012-10-25

    ... DEPARTMENT OF AGRICULTURE Forest Service Blacksmith Ecological Restoration Project, Eldorado... comments to 7600 Wentworth Springs Rd., Georgetown, CA 95634 Attention: Blacksmith Ecological Restoration... (PSD). In preparation for prescribed fire, perimeter line construction would be needed where roads...

  11. Digital collection of aerial photographs from the Common Murre Restoration Project, 1996 (NODC Accession 0015544)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Common Murre Restoration Project is a comprehensive seabird restoration effort aimed at enhancing depleted seabird populations in central California,...

  12. South Bay Salt Pond Tidal Marsh Restoration at Pond A17 Project

    Information about the SFBWQP South Bay Salt Pond Tidal Marsh Restoration at Pond A17 Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  13. South Bay Salt Pond Restoration Project: Planning Phase at Southern Eden Landing

    This project will complete the design and permits to restore 1,300 acres of tidal wetlands, provide 3.5 miles shoreline protection, and accelerate wetlands restoration at the Eden Landing Ecological Reserve.

  14. Digital collection of aerial photographs from the Common Murre Restoration Project, 2006 (NODC Accession 0058096)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Common Murre Restoration Project is a comprehensive seabird restoration effort aimed at enhancing depleted seabird populations in central California,...

  15. Evaluation of Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2010

    Johnson, Gary E.; Diefenderfer, Heida L.; Thom, Ronald M.; Roegner, G. Curtis; Ebberts, Blaine D.; Skalski, John R.; Borde, Amy B.; Dawley, Earl; Coleman, Andre M.; Woodruff, Dana L.; Breithaupt, Stephen A.; Cameron, April; Corbett, C.; Donley, Erin E.; Jay, D. A.; Ke, Yinghai; Leffler, K.; McNeil, C.; Studebaker, Cindy; Tagestad, Jerry D.

    2012-05-01

    This is the seventh and final annual report of a project (2004–2010) addressing evaluation of the cumulative effects of habitat restoration actions in the 235-km-long lower Columbia River and estuary. The project, called the Cumulative Effects (CE) study, was conducted for the U.S. Army Corps of Engineers Portland District by a collaboration of research agencies led by the Pacific Northwest National Laboratory. We achieved the primary goal of the CE study to develop a methodology to evaluate the cumulative effects of habitat actions in the Columbia Estuary Ecosystem Restoration Program. We delivered 1) standard monitoring protocols and methods to prioritize monitoring activities; 2) the theoretical and empirical basis for a CE methodology using levels-of-evidence; 3) evaluations of cumulative effects using ecological relationships, geo-referenced data, hydrodynamic modeling, and meta-analyses; and 4) an adaptive management process to coordinate and coalesce restoration efforts in the LCRE. A solid foundation has been laid for future comprehensive evaluations of progress made by the Columbia Estuary Ecosystem Restoration Program to understand, conserve, and restore ecosystems in the lower Columbia River and estuary.

  16. Hydrodynamic and Ecological Assessment of Nearshore Restoration: A Modeling Study

    Yang, Zhaoqing; Sobocinski, Kathryn L.; Heatwole, Danelle W.; Khangaonkar, Tarang; Thom, Ronald M.; Fuller, Roger

    2010-01-01

    Along the Pacific Northwest coast, much of the estuarine habitat has been diked over the last century for agricultural land use, residential and commercial development, and transportation corridors. As a result, many of the ecological processes and functions have been disrupted. To protect coastal habitats that are vital to aquatic species, many restoration projects are currently underway to restore the estuarine and coastal ecosystems through dike breaches, setbacks, and removals. Information on physical processes and hydrodynamic conditions are critical for the assessment of the success of restoration actions. Restoration of a 160- acre property at the mouth of the Stillaguamish River in Puget Sound has been proposed. The goal is to restore native tidal habitats and estuary-scale ecological processes by removing the dike. In this study, a three-dimensional hydrodynamic model was developed for the Stillaguamish River estuary to simulate estuarine processes. The model was calibrated to observed tide, current, and salinity data for existing conditions and applied to simulate the hydrodynamic responses to two restoration alternatives. Responses were evaluated at the scale of the restoration footprint. Model data was combined with biophysical data to predict habitat responses at the site. Results showed that the proposed dike removal would result in desired tidal flushing and conditions that would support four habitat types on the restoration footprint. At the estuary scale, restoration would substantially increase the proportion of area flushed with freshwater (< 5 ppt) at flood tide. Potential implications of predicted changes in salinity and flow dynamics are discussed relative to the distribution of tidal marsh habitat.

  17. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2009

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Bryson, Amanda J.; Cameron, April; Coleman, Andre M.; Corbett, C.; Dawley, Earl M.; Ebberts, Blaine D.; Kauffman, Ronald; Roegner, G. Curtis; Russell, Micah T.; Silva, April; Skalski, John R.; Thom, Ronald M.; Vavrinec, John; Woodruff, Dana L.; Zimmerman, Shon A.

    2010-10-26

    This is the sixth annual report of a seven-year project (2004 through 2010) to evaluate the cumulative effects of habitat restoration actions in the lower Columbia River and estuary (LCRE). The project, called the Cumulative Effects Study, is being conducted for the U.S. Army Corps of Engineers Portland District (USACE) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory (PNNL), the Pt. Adams Biological Field Station of the National Marine Fisheries Service (NMFS), the Columbia River Estuary Study Taskforce (CREST), and the University of Washington. The goal of the Cumulative Effects Study is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the 235-km-long LCRE. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. From 2005 through 2009, annual field research involved intensive, comparative studies paired by habitat type (tidal swamp versus marsh), trajectory (restoration versus reference site), and restoration action (tidegate replacement vs. culvert replacement vs. dike breach).

  18. Project No. 10 - Partial restoration of Ignalina NPP territory

    2000-01-01

    At present Ignalina NPP territory makes a total of 2544 ha of land. Due to termination of construction activity development and due to the decision taken to shutdown unit 1 the need in such a territory fell off. For normal and safe operation of Ignalina NPP 1440 ha is enough, including 1237 ha for of Ignalina NPP administrative area and 203 ha for auxiliary objects. Ignalina NPP will have to rearrange territory, forestry that was damaged during the construction activities of the plant and to restore the damaged farmlands and to pass the rearranged forestry that belonged to the Ignalina NPP to the Ministry of Forestry. The total estimated cost of the project is about 1.042 M EURO

  19. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2007

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Dawley, Earl M.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Russell, Micah; Skalski, John R.; Thom, Ronald M.; Vavrinec, John

    2008-10-01

    The goal of this multi-year study (2004-2010) is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the lower Columbia River and estuary. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. Field research in 2005, 2006, and 2007 involved intensive, comparative studies paired by habitat type (tidal swamp vs. marsh), trajectory (restoration vs. reference site), and restoration action (tide gate vs. culvert vs. dike breach). The field work established two kinds of monitoring indicators for eventual cumulative effects analysis: core and higher-order indicators. Management implications of limitations and applications of site-specific effectiveness monitoring and cumulative effects analysis were identified.

  20. Design and Analysis of Salmonid Tagging Studies in the Columbia Basin : Evaluating Wetland Restoration Projects in the Columbia River Estuary using Hydroacoustic Telemetry Arrays to Estimate Movement, Survival, and Residence Times of Juvenile Salmonids, Volume XXII (22).

    Perry, Russell W.; Skalski, John R.

    2008-08-01

    Wetlands in the Columbia River estuary are actively being restored by reconnecting these habitats to the estuary, making more wetland habitats available to rearing and migrating juvenile salmon. Concurrently, thousands of acoustically tagged juvenile salmonids are released into the Columbia River to estimate their survival as they migrate through the estuary. Here, we develop a release-recapture model that makes use of these tagged fish to measure the success of wetland restoration projects in terms of their contribution to populations of juvenile salmon. Specifically, our model estimates the fraction of the population that enter the wetland, survival within the wetland, and the mean residence time of fish within the wetland. Furthermore, survival in mainstem Columbia River downstream of the wetland can be compared between fish that remained the mainstem and entered the wetland. These conditional survival estimates provide a means of testing whether the wetland improves the subsequent survival of juvenile salmon by fostering growth or improving their condition. Implementing such a study requires little additional cost because it takes advantage of fish already released to estimate survival through the estuary. Thus, such a study extracts the maximum information at minimum cost from research projects that typically cost millions of dollars annually.

  1. Science Roles and Interactions in Adaptive Management of Large River Restoration Projects, Midwest United States

    Jacobson, R. B.; Galat, D. L.; Smith, C. B.

    2010-12-01

    Most large-river restoration projects include formal or informal implementations of adaptive management strategies which acknowledge uncertainty and use scientific inquiry to learn and refine management options. Although the central role of science in reducing uncertainty is acknowledged in such projects, specific roles and interactions can vary widely, including how science relates to decision-making within the governance of these projects. Our objective is to present some structured generalizations about science roles and interactions as developed from the authors’ experiences in adaptive management of large river restoration in the Midwest United States. Scientific information may be introduced into decision making by scientists acting in any of the three roles common to adaptive management -- action agency representative, stakeholder, or science provider. We have observed that confusion and gridlock can arise when it is unclear if a scientist is acting as an advocate for a stakeholder or management position, or instead as an independent, “honest broker” of science. Although both advocacy and independence are proper and expected in public decision making, it is useful when scientists unambiguously identify their role. While complete scientific independence may be illusory, transparency and peer review can promote the ideal. Transparency comes from setting clear directions and objectives at the decision-making level and defining at the outset how learning will help assess progress and inform decisions. Independent peer reviews of proposals, study plans, and publications serve as a powerful tool to advance scientific independence, even if funding sources present a potential conflict of interest. Selection of experts for scientific advice and review often requires consideration of the balance between benefits of the “outside” expert (independent, knowledgeable but with little specific understanding of the river system), compared to those provided by the

  2. Looking back on a successful project. The Restoration of the Royal Palace in Amsterdam

    Bert van Bommel

    2013-06-01

    Full Text Available After 1968, few changes were made to the Royal Palace in Amsterdam and eventually the palace was no longer functionally and technically up-to-date. Initially, the most recent restoration was only aimed at remedying that situation. Also, the project was split up and priority was given to fixing up the interior. Gradually, the actual restoration gained prominence. In 2007 it was decided to also restore the 1808 furniture. Until 2006, the government architect had hardly been involved in the restoration of the interior. This architect, Krijn van den Ende, was advised by various committees. Prior restorations (1929-1939 and 1960-1968 had restored the palace to its 17th-century state as best as possible. The most recent restoration respected this, while at the same time it aimed at connecting the 17th century character of the building to the unique collection of Empire furniture. This furniture was restored, as were the chandeliers and candelabras. All the ceilings on the first floor were studied and treated and the paintings between the beams were meticulously restored. A very important aspect was the restoration of the so-called ‘Bataven’ series in the galleries. Much of the work concerned making the building conform to contemporary standards. Once again the palace is now a suitable venue for official occasions. The inevitable addition of a lift did however cause quite a stir. Accessibility was improved and more representative rooms are now open to the public than before. The government architect was involved already in the preparatory stages of the second part of the restoration, which concerned the façades and the roofs. In executing the actual work a support committee provided advice and direction on his behalf. Although the sandstone is generally of a high quality, before 1968 a limited number of deteriorating blocks had been replaced. This time too, a number of blocks needed attention. The heavy scaffolding that needed to be installed for

  3. The Role of Anthropogenic Stratigraphy in River Restoration Projects

    Evans, J. E.; Webb, L. D.

    2012-12-01

    As part of a river restoration project and removal of a low-head dam on the Ottawa River (northwestern Ohio and southeastern Michigan) in 2007, a longer-term project was initiated to assess anthropogenic changes of the Ottawa River fluvial system. A composite stratigraphic section 4.5 m in length was constructed by stratigraphic correlation from three trenches up to 2.5 m in depth and 14 vibracores up to 2.5 m in length, all within a small region (tires, intact or pieces of glass bottles, and one horizon of displaced railroad ties. Age control for the composite section is provided by 4 14C dates, 6 OSL dates, and one bottle with a date stamp. Two prominent flood horizons are indicated in multiple trenches or cores, and identified as the historic floods of 1913 and 1959. The data show the following major changes in the fluvial system over time: (1) prior to approximately 5 Ka, the river system was transporting mineral-rich sediment and formed meandering point-bar sequences approximately 1.5 m thick; (2) between approximately 5 Ka and 200 YBP, the river system was transporting organic-rich sediment (i.e., blackwater stream) bordered by riparian wetlands accumulating peat (part of the regional "Great Black Swamp" discovered by settlers from eastern North America); (3) between approximately 200 YBP and the early 1960s the river system was transporting mineral-rich sediment (i.e., brownwater stream), probably sourced from extensive land clearance for agriculture, which backfilled and overtopped the previous riparian wetlands and produced an series of thin channel fills interpreted as rapidly shifting avulsional channels; (4) since the early 1960s, sediment supply has exceeded sediment conveyance capacity, leading to vertical aggradation of approximately 1.7 m, creating the fill-terrace morphology evident today; and (5) overlapping with the previous stage, channel incision and lateral channel migration has produced a fluvial system dominated by bank erosion, logjams due

  4. 75 FR 5765 - NOAA Coastal and Marine Habitat Restoration Project Supplemental Funding

    2010-02-04

    ...-02] RIN 0648-ZC05 NOAA Coastal and Marine Habitat Restoration Project Supplemental Funding AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of supplemental funding for NOAA Coastal and Marine Habitat Restoration Projects. SUMMARY...

  5. 76 FR 46721 - Salmon-Challis National Forest, ID; Upper North Fork HFRA Ecosystem Restoration Project...

    2011-08-03

    ...-Challis National Forest, ID; Upper North Fork HFRA Ecosystem Restoration Project Environmental Impact... improve the health of the ecosystem and reach the desired future condition. DATES: Comments concerning the... Ecosystem Restoration Project EIS, P.O. Box 180, 11 Casey Rd., North Fork, ID 83466. Comments may also be...

  6. Nuclear criticality safety program for environmental restoration projects

    Marble, R.C.; Brown, T.D.

    1994-05-01

    The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center (FMPC), is located on a 1050 acre site approximately twenty miles northwest of Cincinnati, Ohio. The production area of the site covers approximately 136 acres in the central portion of the site. Surrounding the core production area is a buffer consisting of leased grazing land, reforested land, and unused areas. The uranium processing facility was designed and constructed in the early 1950s. During the period from 1952 to 1989 the site produced uranium feed material and uranium products used in the United States weapons complex. Production at the site ended in 1989, when the site was shut down for what was expected to be a short period of time. However, the FUTC was permanently shut down in 1991, and the site's mission was changed from production to environmental restoration. The objective of this paper is to give an update on activities at the Fernald Site and to describe the Nuclear Criticality Safety issues that are currently being addressed

  7. Weaver Bottoms Wildlife Habitat Restoration: A Case Study

    Davis, Mary M; Damberg, Carol

    1994-01-01

    .... The Weaver Bottoms Rehabilitation Project is a large scale wetland restoration project that is directed at regaining lost habitat by creating hydrological and energy conditions conducive to marsh growth and production. Davis et al. (1993...

  8. South Bay Salt Pond Mercury Studies Project

    Information about the SFBWQP South Bay Salt Pond Mercury Studies Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  9. Use of structured decision-making to explicitly incorporate environmental process understanding in management of coastal restoration projects: Case study on barrier islands of the northern Gulf of Mexico.

    Dalyander, P Soupy; Meyers, Michelle; Mattsson, Brady; Steyer, Gregory; Godsey, Elizabeth; McDonald, Justin; Byrnes, Mark; Ford, Mark

    2016-12-01

    Coastal ecosystem management typically relies on subjective interpretation of scientific understanding, with limited methods for explicitly incorporating process knowledge into decisions that must meet multiple, potentially competing stakeholder objectives. Conversely, the scientific community lacks methods for identifying which advancements in system understanding would have the highest value to decision-makers. A case in point is barrier island restoration, where decision-makers lack tools to objectively use system understanding to determine how to optimally use limited contingency funds when project construction in this dynamic environment does not proceed as expected. In this study, collaborative structured decision-making (SDM) was evaluated as an approach to incorporate process understanding into mid-construction decisions and to identify priority gaps in knowledge from a management perspective. The focus was a barrier island restoration project at Ship Island, Mississippi, where sand will be used to close an extensive breach that currently divides the island. SDM was used to estimate damage that may occur during construction, and guide repair decisions within the confines of limited availability of sand and funding to minimize adverse impacts to project objectives. Sand was identified as more limiting than funds, and unrepaired major breaching would negatively impact objectives. Repairing minor damage immediately was determined to be generally more cost effective (depending on the longshore extent) than risking more damage to a weakened project. Key gaps in process-understanding relative to project management were identified as the relationship of island width to breach formation; the amounts of sand lost during breaching, lowering, or narrowing of the berm; the potential for minor breaches to self-heal versus developing into a major breach; and the relationship between upstream nourishment and resiliency of the berm to storms. This application is a

  10. Use of structured decision-making to explicitly incorporate environmental process understanding in management of coastal restoration projects: Case study on barrier islands of the northern Gulf of Mexico

    Dalyander, P. Soupy; Meyers, Michelle B.; Mattsson, Brady; Steyer, Gregory; Godsey, Elizabeth; McDonald, Justin; Byrnes, Mark R.; Ford, Mark

    2016-01-01

    Coastal ecosystem management typically relies on subjective interpretation of scientific understanding, with limited methods for explicitly incorporating process knowledge into decisions that must meet multiple, potentially competing stakeholder objectives. Conversely, the scientific community lacks methods for identifying which advancements in system understanding would have the highest value to decision-makers. A case in point is barrier island restoration, where decision-makers lack tools to objectively use system understanding to determine how to optimally use limited contingency funds when project construction in this dynamic environment does not proceed as expected. In this study, collaborative structured decision-making (SDM) was evaluated as an approach to incorporate process understanding into mid-construction decisions and to identify priority gaps in knowledge from a management perspective. The focus was a barrier island restoration project at Ship Island, Mississippi, where sand will be used to close an extensive breach that currently divides the island. SDM was used to estimate damage that may occur during construction, and guide repair decisions within the confines of limited availability of sand and funding to minimize adverse impacts to project objectives. Sand was identified as more limiting than funds, and unrepaired major breaching would negatively impact objectives. Repairing minor damage immediately was determined to be generally more cost effective (depending on the longshore extent) than risking more damage to a weakened project. Key gaps in process-understanding relative to project management were identified as the relationship of island width to breach formation; the amounts of sand lost during breaching, lowering, or narrowing of the berm; the potential for minor breaches to self-heal versus developing into a major breach; and the relationship between upstream nourishment and resiliency of the berm to storms. This application is a

  11. A restoration and conservation project of the “Saint Dominic” Monastery in Soriano Calabro, Italy

    Nazzareno Davolos

    2008-04-01

    Full Text Available The article is extracted from the Master Thesis about Restoration of the Monuments at “La Sapienza”, University of the Studies of Rome. The Monastery was one of the most important of the Dominican Order in Europe. The building dates back to year 1510, it broke down almost completely in the earthquake of year 1659. It was rebuilt following the architect B. Presti’s project. At the present time the “Saint Domenic” Monastery largely seems a ruin, mainly as a consequence of the cat- N. Davolos - A restoration and conservation project of the ÒSaint DominicÓ Monastery... 185 astrophic earthquake in 1783. However, with the new look that has acquired, it still preserves an extraordinary charm that continues to astonish. The project followed the trend of the critical and conservative restoration with the safeguard of the artistic and figurative data of the “Saint Domenic” Monastery which has been analysed through an accurate historical-critical work. The idea is to preserve and transmit to the future generations the “Saint Domenic” monument in his authenticity, in its formal and material consistence, with the marks of the passing of time. The abstracts reports only the most important aspects which are representative of the project. Besides the historical analysis, laboratory examination have been executed on the material used in the construction of the ancient facade through the observation of thin sections by optic microscope and with the realization of spectrum of X-ray diffraction, in order to know the nature and composition, the state of preservation and the kinds of deterioration to support an appropriate intervention of restoration.

  12. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  13. [Restoration filtering based on projection power spectrum for single-photon emission computed tomography].

    Kubo, N

    1995-04-01

    To improve the quality of single-photon emission computed tomographic (SPECT) images, a restoration filter has been developed. This filter was designed according to practical "least squares filter" theory. It is necessary to know the object power spectrum and the noise power spectrum. The power spectrum is estimated from the power spectrum of a projection, when the high-frequency power spectrum of a projection is adequately approximated as a polynomial exponential expression. A study of the restoration with the filter based on a projection power spectrum was conducted, and compared with that of the "Butterworth" filtering method (cut-off frequency of 0.15 cycles/pixel), and "Wiener" filtering (signal-to-noise power spectrum ratio was a constant). Normalized mean-squared errors (NMSE) of the phantom, two line sources located in a 99mTc filled cylinder, were used. NMSE of the "Butterworth" filter, "Wiener" filter, and filtering based on a power spectrum were 0.77, 0.83, and 0.76 respectively. Clinically, brain SPECT images utilizing this new restoration filter improved the contrast. Thus, this filter may be useful in diagnosis of SPECT images.

  14. Restoration filtering based on projection power spectrum for single-photon emission computed tomography

    Kubo, Naoki

    1995-01-01

    To improve the quality of single-photon emission computed tomographic (SPECT) images, a restoration filter has been developed. This filter was designed according to practical 'least squares filter' theory. It is necessary to know the object power spectrum and the noise power spectrum. The power spectrum is estimated from the power spectrum of a projection, when the high-frequency power spectrum of a projection is adequately approximated as a polynomial exponential expression. A study of the restoration with the filter based on a projection power spectrum was conducted, and compared with that of the 'Butterworth' filtering method (cut-off frequency of 0.15 cycles/pixel), and 'Wiener' filtering (signal-to-noise power spectrum ratio was a constant). Normalized mean-squared errors (NMSE) of the phantom, two line sources located in a 99m Tc filled cylinder, were used. NMSE of the 'Butterworth' filter, 'Wiener' filter, and filtering based on a power spectrum were 0.77, 0.83, and 0.76 respectively. Clinically, brain SPECT images utilizing this new restoration filter improved the contrast. Thus, this filter may be useful in diagnosis of SPECT images. (author)

  15. Restoration projects for decontamination of facilities from chemical, biological and radiological contamination after terrorist actions

    Fingas, M.; Volchek, K.; Lumley, T.; Thouin, G.; Harrison, S.; Kuang, W. [Environment Canada, Ottawa, ON (Canada). Emergencies Science and Technology Division, Environmental Technology Centre, Science and Technology Branch; Payette, P.; Laframboise, D.; Best, M. [Public Health Agency of Canada, Ottawa, ON (Canada); Krishnan, J.; Wagener, S.; Bernard, K.; Majcher, M. [Public Health Agency of Canada, Winnipeg, MB (Canada); Cousins, T.; Jones, T. [Defence Research and Development Canada, Ottawa, ON (Canada); Velicogna, D.; Hornof, M.; Punt, M. [SAIC Canada, Ottawa, ON (Canada)

    2006-07-01

    This paper reviewed studies that identified better decontamination methods for chemical, biological and radiological/nuclear (CBRN) attacks. In particular, it reviewed aspects of 3 projects in which procedures were tested and validated for site restoration. Cleanup targets or standards for decontaminating buildings and materials after a CBRN attack were also developed. The projects were based on physicochemical and toxicological knowledge of potential terrorist agents and selected surface matrices. The projects also involved modeling and assessing environmental and health risks. The first multi-agent project involved gathering information on known procedures for restoration of areas including interiors and exteriors of buildings, contents, parking lots, lawn, and vehicles. Air inside the building was included. The efficacy of some of the proposed concepts was tested. Results included the determination of appropriate surrogates for anthrax and tests of liquid and gaseous biocides on the surrogates. The development of new contamination procedures using peroxyacetic acid were also discussed. The second project involved decontamination tests on CBRN using specially-constructed buildings at the Counter-terrorism Technology Centre at Defence Research and Development Canada in Suffield. The buildings will be contaminated with chemical and biological agents and with short-lived radionuclides. They will be decontaminated using the best-performing technologies known. Information collected will include fate of the contaminant and decontamination products, effectiveness of the restoration methods, cost and duration of cleanup and logistical problems. The third project is aimed at developing cleanup standards for decontaminating buildings and construction materials after a chemical or biological attack. It will create as many as 12 algorithms for the development of 50 standards which will help cleanup personnel and first-responders to gauge whether proposed methods can achieve

  16. A Systematic Study of Zerbar Lake Restoration

    Hosseini, Reza; Oveis Torabi, Seyed; Forman Asgharzadeh, Deonna

    2017-04-01

    The beautiful lake of Zerbar, located near Marivan City at the west of Iran, is a freshwater lake with an area of 20 km2 and average depth of 5 meters. The lake is created by regional tectonic activities and is mainly fed with natural spring water from bottom. During the past three decades, regional development has caused much disturbance to the natural environment of the lake and its watershed. Rescuing the lake is crucial to the sustainability of the whole region. The study of Zerbar Restoration was performed with the aim to restore its health indicators. Variety of human activities in the watershed, as well as the multidisciplinary nature of lake restoration studies, made it necessary to develop a systematic approach to conduct the study. In Step I of restoration studies, satellite images were investigated to identify the historical changes of watershed during the past 30 years. Meanwhile, documents since 50 years ago were studied. Results indicate that farmland and graze land areas have been relatively constant during the past 50 years. Also, the area of lake, its riparian canes and floating plants have not changed much. In fact, the only significant land use change observed was the significant spread of Marivan City that has stretched toward the lake. The main physical variation to the lake has been elevating the southern edge of the lake by a constructing a landfill dam which was done to control the lake's overflow discharge for irrigation of downstream farmland development. Step II consists of studies performed by disciplines of water resources, hydrogeology, water quality, wetland and watershed ecology, agriculture, animal farming and fishery. Study results indicate that eutrophication (TSL>100), mainly caused by sewage from Marivan City and the surrounding rural areas has been the main reason for lake ecosystem degradation. DPSIR framework, as a novel approach in lake restoration, was applied to synthesize the study results of different disciplines in a

  17. Bridge Creek IMW database - Bridge Creek Restoration and Monitoring Project

    National Oceanic and Atmospheric Administration, Department of Commerce — The incised and degraded habitat of Bridge Creek is thought to be limiting a population of ESA-listed steelhead (Oncorhynchus mykiss). A logical restoration approach...

  18. Restoration of the analytically reconstructed OpenPET images by the method of convex projections

    Tashima, Hideaki; Murayama, Hideo; Yamaya, Taiga [National Institute of Radiological Sciences, Chiba (Japan); Katsunuma, Takayuki; Suga, Mikio [Chiba Univ. (Japan). Graduate School of Engineering; Kinouchi, Shoko [National Institute of Radiological Sciences, Chiba (Japan); Chiba Univ. (Japan). Graduate School of Engineering; Obi, Takashi [Tokyo Institute of Technology (Japan). Interdisciplinary Graduate School of Science and Engineering; Kudo, Hiroyuki [Tsukuba Univ. (Japan). Graduate School of Systems and Information Engineering

    2011-07-01

    We have proposed the OpenPET geometry which has gaps between detector rings and physically opened field-of-view. The image reconstruction of the OpenPET is classified into an incomplete problem because it does not satisfy the Orlov's condition. Even so, the simulation and experimental studies have shown that applying iterative methods such as the maximum likelihood expectation maximization (ML-EM) algorithm successfully reconstruct images in the gap area. However, the imaging process of the iterative methods in the OpenPET imaging is not clear. Therefore, the aim of this study is to analytically analyze the OpenPET imaging and estimate implicit constraints involved in the iterative methods. To apply explicit constraints in the OpenPET imaging, we used the method of convex projections for restoration of the images reconstructed by the analytical way in which low-frequency components are lost. Numerical simulations showed that the similar restoration effects are involved both in the ML-EM and the method of convex projections. Therefore, the iterative methods have advantageous effect of restoring lost frequency components of the OpenPET imaging. (orig.)

  19. The Frari bell tower in Venice: study and restoration

    Ilaria Cavaggioni

    2010-12-01

    Full Text Available The preliminary study, project and restoration process of the bell tower of the Frari church in Venice is an exemplary case of intervention on a historic building. This intervention started within depth research into the documentary data along with a detailed study of the material fabric which has made it possible to compare the verisimilitude and gaps in the historic sources, the evolution of the building, its built reality and the effects of the repair works carried out in the past at the same time as the damages in the fabric were monitored. Thanks to the knowledge thus gleaned, the restoration works proceeded with great caution in order to respect the material history of the building and short and long-term structural compatibility.

  20. A visual progression of the Fort Valley Restoration Project treatments using remotely sensed imagery (P-53)

    Joseph E. Crouse; Peter Z. Fule

    2008-01-01

    The landscape surrounding the Fort Valley Experimental Forest in northern Arizona has changed dramatically in the past decade due to the Fort Valley Restoration Project, a collaboration between the Greater Flagstaff Forest Partnership, Coconino National Forest, and Rocky Mountain Research Station. Severe wildfires in 1996 sparked community concern to start restoration...

  1. Hangman Restoration Project Year-End Report FY2008.

    Coeur d' Alene Tribe Department of Natural Resources.

    2008-11-12

    This report covers the main goals of FY2008 from which the Work Elements were derived. The goals and products are listed by heading and the associated work elements are referenced in the text. A list of the FY2008 Work Elements is included as Appendix A. FY2008 witnessed the completion of the hntkwipn Management Plan and the first substantive efforts to restore the important habitats encompassed by the mitigation properties in the Upper Hangman Watershed. Native grasses were planted and germination was evaluated. Also, drain tiles that greatly altered the hydrologic function of the Sheep and Hangman Creek Flood Plains were removed and/or disrupted. Preparation for future restoration efforts were also made in FY2008. Designs were produced for the realignment of Sheep Creek and the decommissioning of seven drainage ditches within hntkwipn. A prioritization plan was drafted that greatly expands the area of focus for restoring native fish population in Hangman Creek.

  2. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  3. The Carolina Bay Restoration Project - Status Report II 2000-2004.

    Barton, Christopher

    2006-07-13

    A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report. Post restoration monitoring will continue through 2005. A final report to the Mitigation Bank Review Team will be submitted in mid-2006.

  4. Public support for river restoration. A mixed-method study into local residents' support for and framing of river management and ecological restoration in the Dutch floodplains.

    Buijs, Arjen E

    2009-06-01

    In many European countries, accommodating water has become the dominant paradigm in river management. In the Netherlands, extensive river restoration projects are being implemented, many of which draw serious opposition from the public. To investigate the causes of such opposition, a comprehensive study of public attitudes towards river restoration was conducted in three floodplains, both before and after river restoration. The study combined quantitative questionnaires (N=562) with open interviews (N=29). This paper describes how local residents perceive the effects of river restoration on landscape quality and how residents and protest groups use landscape quality in combination with other arguments to strategically frame river management policies. Results show that measurement of the perceived outcomes of nature restoration needs to be complemented by a more dynamic type of research, focusing on the social processes of the framing of restoration plans. Theoretically, the paper aims to contribute to the development of a rigorous research strategy to study framing processes in environmental management, using a mixed-methods approach. In general, local residents are supportive of river restoration projects. Although restoration may diminish feelings of attachment to an area, for most people this negative effect is compensated by the positive effects on scenic beauty and perceived protection from flooding. However, these positive effects may become contested because of the active framing of river restoration by protest groups. Residents use three distinct frames to give meaning to river restoration projects: (i) an attachment frame, focusing on cultural heritage and place attachment (ii) an attractive nature frame, focusing on nature as attractive living space and the intrinsic value of nature (iii) a rurality frame, focusing on rural values, agriculture and cultural heritage. Resistance to river restoration plans stems from the attachment and rurality frames

  5. Great Basin Research and Management Project: Restoring and maintaining riparian ecosystem integrity

    Jeanne C. Chambers

    2000-01-01

    The Great Basin Research and Management Project was initiated in 1994 by the USDA Forest Service, Rocky Mountain Research Station’s Ecology, Paleoecology, and Restoration of Great Basin Watersheds Project to address the problems of stream incision and riparian ecosystem degradation in central Nevada. It is a highly interdisciplinary project that is being conducted in...

  6. Project Gasbuggy well plugging and site restoration plan

    1978-07-01

    The operational plan for conducting the final restoration work at the site of the first U.S. underground nuclear experiment for the stimulation of low-productivity natural gas reservoirs is given. The plan includes well plugging procedures, surface facilities decontamination and removal procedures, radiological guidelines, and environmental considerations

  7. Prairie Restoration Project: Alternatives for Identifying Gifted Students

    Salisbury, Katie E.; Rule, Audrey C.; Vander Zanden, Sarah M.

    2016-01-01

    An authentic, challenging curriculum engaged middle school students from an urban district in exploratory work related to restoring a small prairie at the school. Integrated science-literacy-arts activities were coupled with a system of thinking skills that helped students view issues from different perspectives. Impassioned guest speakers and an…

  8. The Environmental Restoration Project Style and Resources Guide; TOPICAL

    C. J. Forbes

    1999-01-01

    This Style Guide identifies the wide and flexible array of support services/resources that are available to ER project and functional organizations through Publication and Graphic Services. The Style Guide describes how ER Project groups can complete virtually any kind of information project without any costs charged to their budgets. Another purpose of the Style Guide is to provide ER project and functional organizations with the ability to determine when to request capabilities/resources for information projects, and when to complete such projects on their own

  9. Richland Environmental Restoration Project management action process document

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites

  10. Richland Environmental Restoration Project management action process document

    NONE

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  11. Meeting the requirements for a DOE environmental restoration project. The Fernald strategy

    Vanoss, R.L.; Risenhoover, G.M.

    1994-01-01

    Environmental Restoration (ER) of five Operable Units (OU) at Fernald Environmental Management Project (FEMP) includes compliance with the requirements of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation Recovery Act (RCRA), National Environmental Policy Act (NEPA), and DOE Orders. Each regulatory driver has differing procedural requirements for documenting calculations, decisions, and actions involved in site cleanup. Integration of documentation and avoidance of duplication can save time and money. Such savings are being achieved by OU specific application of supporting studies, revised procedures, and guidance documents. Each OU is seeking appropriate opportunities to produce single documents that simultaneously fulfill the important requirements of the other regulations and DOE orders. These opportunities are evaluated at all phases of decision making, remedial design, and remedial action. Three essential processes precede environmental restoration/remedial action at a DOE site/project: 1. Completion of decision-making documents required by governing or applicable statutes. 2. Completion of important scientific and engineering analyses of remedial alternatives, and design and implementation of the remedial solution established in the CERCLA Record of Decision (ROD). 3. Preparation of DOE-mandated documentation to record engineering evaluations and cost estimates required for budgeting, decision making, and project management. Methodology and requirements for each process have developed from long, successful practice, but independently of each other. FERMCO, as new DOE contractor at Fernald and first Environmental Restoration Management Contractor (ERMC), is committed to a process of Continuous Performance Improvement (CPI). A major reevaluation of documentation and processes for support of environmental decision-making and design of cleanup activities to remediate the five OUs at the FEMP is being undertaken

  12. Restoring of offshore wind farm sites. Lillgrund Pilot Project; Aaterstaellande av havsbaserad vindkraft. Lillgrund Pilot Projekt

    Stumle Wikander, Jhenny (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    This report focuses on the legal aspects of decommissioning and restoring of offshore wind farm sites, as part of an extensive report on the Lillgrund Offshore Wind Farm Pilot Project. For this analysis, all permit conditions of the granted permits for the offshore wind parks in Sweden have been collected and studied. According to the Swedish Environmental code 'the validity of a permit, approval or exemption may be made subject to the requirement that the person who intends to pursue the activity must furnish a security for the costs of after-treatment and any other restoration measures that may be necessary as a result. The state, municipalities, county councils and associations of municipalities shall not be required to furnish a security. If there is cause to assume that the security furnished is no longer sufficient, the authority which is considering the application for a permit, approval or exemption may require an additional security to be furnished'. The permits show that different types of securities are being used, with bank warranties and securities being the most common. Securities are either fixed and furnished prior to start of construction or start of operations, or they are obtained gradually over the life of the project. Among the twelve permits studied, a gradual tendency to use a combination of the two alternatives can bee seen. The conditions governing when an offshore wind farm is to be discontinued and which parts need to be partly or fully removed from the site are obviously of future importance. The issue has been addressed to different degrees in the permits, some to a clear legal extent, while others are more general. The Lillgrund Offshore Wind Farm was secured for 60 million SEK. The extent to which the park is to be decommissioned and the site to be restored is decided by the county administrative board once production is terminated

  13. INVENTORY OF ECOSYSTEM RESTORATION PROJECTS - PUBLISHED ON THE OFFICE OF WATER WEB PAGE

    USEPA's National Risk Management Research Laboratory working jointly with the Office of Water, has developed an Internet-accessible database of ecosystem restoration projects within the Mid-Atlantic Integrated Assessment (MAIA) region. This article informs project owners of the i...

  14. Planning risk communication for UMTRA project groundwater restoration

    Hundertmark, Charles [Jacobs Engineering Group Inc. and University of Phoenix (United States); Hoopes, Jack [Jacobs Engineering Group Inc. (United States); Flowers, Len [Roy F. Weston Company (United States); Jackson, David G [U.S. Department of Energy (United States)

    1992-07-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  15. Planning risk communication for UMTRA project groundwater restoration

    Hundertmark, Charles; Hoopes, Jack; Flowers, Len; Jackson, David G.

    1992-01-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  16. Image restoration by the method of convex projections: part 2 applications and numerical results.

    Sezan, M I; Stark, H

    1982-01-01

    The image restoration theory discussed in a previous paper by Youla and Webb [1] is applied to a simulated image and the results compared with the well-known method known as the Gerchberg-Papoulis algorithm. The results show that the method of image restoration by projection onto convex sets, by providing a convenient technique for utilizing a priori information, performs significantly better than the Gerchberg-Papoulis method.

  17. Healthcare for migrants, participatory health research and implementation science--better health policy and practice through inclusion. The RESTORE project.

    MacFarlane, Anne; O'Reilly-de Brún, Mary; de Brún, Tomas; Dowrick, Christopher; O'Donnell, Catherine; Mair, Frances; Spiegel, Wolfgang; van den Muijsenbergh, Maria; van Weel Baumgarten, Evelyn; Lionis, Christos; Clissmann, Ciaran

    2014-06-01

    This is a time of unprecedented mobility across the globe. Healthcare systems need to adapt to ensure that primary care is culturally and linguistically appropriate for migrants. Evidence-based guidelines and training interventions for cultural competence and the use of professional interpreters are available across European healthcare settings. However, in real-world practice migrants and their healthcare providers 'get by' with a range of informal and inadequate strategies. RESTORE is an EU FP7 funded project, which is designed to address this translational gap. The objective of RESTORE is to investigate and support the implementation of guidelines and training initiatives to support communication in cross-cultural consultations in selected European primary care settings. RESTORE is a qualitative, participatory health project running from 2011-2015. It uses a novel combination of normalization process theory and participatory learning and action research to follow and shape the implementation journeys of relevant guidelines and training initiatives. Research teams in Ireland, England, the Netherlands, Austria and Greece are conducting similar parallel qualitative case study fieldwork, with a complementary health policy analysis led by Scotland. In each setting, key stakeholders, including migrants, are involved in participatory data generation and analysis. RESTORE will provide knowledge about the levers and barriers to the implementation of guidelines and training initiatives in European healthcare settings and about successful, transferrable strategies to overcome identified barriers. RESTORE will elucidate the role of policy in shaping these implementation journeys; generate recommendations for European policy driving the development of culturally and linguistically appropriate healthcare systems.

  18. Morphological, hydrological, biogeochemical and ecological changes and challenges in river restoration - the Thur River case study

    Schirmer, M.; Luster, J.; Linde, N.; Perona, P.; Mitchell, E. A. D.; Barry, D. A.; Hollender, J.; Cirpka, O. A.; Schneider, P.; Vogt, T.; Radny, D.; Durisch-Kaiser, E.

    2014-06-01

    River restoration can enhance river dynamics, environmental heterogeneity and biodiversity, but the underlying processes governing the dynamic changes need to be understood to ensure that restoration projects meet their goals, and adverse effects are prevented. In particular, we need to comprehend how hydromorphological variability quantitatively relates to ecosystem functioning and services, biodiversity as well as ground- and surface water quality in restored river corridors. This involves (i) physical processes and structural properties, determining erosion and sedimentation, as well as solute and heat transport behavior in surface water and within the subsurface; (ii) biogeochemical processes and characteristics, including the turnover of nutrients and natural water constituents; and (iii) ecological processes and indicators related to biodiversity and ecological functioning. All these aspects are interlinked, requiring an interdisciplinary investigation approach. Here, we present an overview of the recently completed RECORD (REstored CORridor Dynamics) project in which we combined physical, chemical, and biological observations with modeling at a restored river corridor of the perialpine Thur River in Switzerland. Our results show that river restoration, beyond inducing morphologic changes that reshape the river bed and banks, triggered complex spatial patterns of bank infiltration, and affected habitat type, biotic communities and biogeochemical processes. We adopted an interdisciplinary approach of monitoring the continuing changes due to restoration measures to address the following questions: How stable is the morphological variability established by restoration? Does morphological variability guarantee an improvement in biodiversity? How does morphological variability affect biogeochemical transformations in the river corridor? What are some potential adverse effects of river restoration? How is river restoration influenced by catchment-scale hydraulics

  19. Pacific Lamprey Research and Restoration Project : Annual Report 2000.

    Close, David A.

    2002-11-01

    This report summarizes results of research activities conducted in 1999-2000. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin.

  20. Project management case studies

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  1. Pacific lamprey research and restoration project: annual report 1999; ANNUAL

    Close, David A.

    2001-01-01

    This report summarizes results of research activities conducted from 1996 through 1999. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin. Traditional Ecological Knowledge (TEK) of Pacific lampreys from tribal members within the Confederated Tribes of the Umatilla Indian Reservation was useful in gaining baseline life history information. Tribal members described harvesting two types of lampreys from spring through fall, the short brown type and the long dark type. Lamprey spawning distribution was from the mouth to the headwaters in the Umatilla River. Larval lampreys were observed in the mud and sand areas of the river. Tribal members observed major declines in lampreys within the Columbia River basin. Larval Pacific lampreys were distributed throughout the John Day River basin. Larval distribution in the other subbasins was patchy and limited to the lower reaches of the streams. Larval densities were highly variable in the Middle Fork John Day and North Fork John Day rivers, as opposed to the Main stem John Day River. Larval lengths varied little in the Middle Fork John Day and North Fork John Day rivers, but were highly variable in the Main stem John Day River. Larval abundance decreased as we moved upstream in the Columbia and Snake rivers. In addition, we found strong evidence for lack of larval recruitment as distance increased from the mouth of the Columbia River. We identified clinical indicators of stress in adult Pacific lampreys. Plasma glucose became elevated soon after acute stress and remained elevated for one week. Plasma lactate also became elevated by 30 minutes; however, it decreased to resting levels by one hour after application of the stressor

  2. Pacific Lamprey Research and Restoration Project : Annual Report 1999.

    Close, David A.

    2001-10-01

    This report summarizes results of research activities conducted from 1996 through 1999. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin. Traditional Ecological Knowledge (TEK) of Pacific lampreys from tribal members within the Confederated Tribes of the Umatilla Indian Reservation was useful in gaining baseline life history information. Tribal members described harvesting two types of lampreys from spring through fall, the short brown type and the long dark type. Lamprey spawning distribution was from the mouth to the headwaters in the Umatilla River. Larval lampreys were observed in the mud and sand areas of the river. Tribal members observed major declines in lampreys within the Columbia River basin. Larval Pacific lampreys were distributed throughout the John Day River basin. Larval distribution in the other subbasins was patchy and limited to the lower reaches of the streams. Larval densities were highly variable in the Middle Fork John Day and North Fork John Day rivers, as opposed to the Main stem John Day River. Larval lengths varied little in the Middle Fork John Day and North Fork John Day rivers, but were highly variable in the Main stem John Day River. Larval abundance decreased as we moved upstream in the Columbia and Snake rivers. In addition, we found strong evidence for lack of larval recruitment as distance increased from the mouth of the Columbia River. We identified clinical indicators of stress in adult Pacific lampreys. Plasma glucose became elevated soon after acute stress and remained elevated for one week. Plasma lactate also became elevated by 30 minutes; however, it decreased to resting levels by one hour after application of the stressor

  3. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    Garrison, R.C.

    1995-01-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ''Tank Waste Remediation System (TWRS) Project Documentation Methodology,'' 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms' instrumentation, ventilation, electrical distribution, and waste transfer systems

  4. Do the Principles of Ecological Restoration Cover EU LIFE Nature Cofunded Projects in Denmark?

    Jonas Morsing

    2013-12-01

    Full Text Available Ecological restoration is becoming a main component in nature management; hence, its definitions and interpretations of the underlying principles are widely discussed. In Denmark, restoration has been implemented for decades, and the LIFE Nature program has contributed to several large-scale projects. Our aim was to indicate tendencies in Danish nature policy by analyzing a representative sample of nature management projects. Using qualitative document analyses of official reports, we investigated how well 13 LIFE Nature cofinanced projects undertaken in Denmark fit with the principles of ecological restoration, as formulated in the nine attributes of the Society for Ecological Restoration's Primer on Ecological Restoration, and based on the five myths of ecological restoration. Objectives of the analyzed projects were divided into three categories: conservation of a single or a group of species; restoration of set-aside areas, mainly on abandoned agricultural land; and habitat management of Natura 2000 areas. Despite this grouping, improvement in living conditions for certain species associated with specific nature types was in focus in all projects. No projects considered or fulfilled all nine attributes. It seems that attributes associated with fundamental requirements for the existence of target species or habitats were more often fulfilled than attributes associated with continuity of the ecosystem as a whole, which indicated a focus on ecosystem structures rather than on processes. We found that the two assumptions of a predictable single endpoint (the myth of the Carbon Copy and that nature is controllable (the myth of Command and Control were notably frequent in the Danish projects. Often, the target ecosystem was associated with a semicultural landscape, and management focused on keeping the vegetation low and preventing overgrowth of colonizing trees. The results indicated that nature policy in Denmark and the LIFE Nature program are

  5. The critical role of islands for waterbird breeding and foraging habitat in managed ponds of the South Bay Salt Pond Restoration Project, South San Francisco Bay, California

    Ackerman, Joshua T.; Hartman, C. Alex; Herzog, Mark P.; Smith, Lacy M.; Moskal, Stacy M.; De La Cruz, Susan E. W.; Yee, Julie L.; Takekawa, John Y.

    2014-01-01

    The South Bay Salt Pond Restoration Project aims to restore 50–90 percent of former salt evaporation ponds into tidal marsh in South San Francisco Bay, California. However, large numbers of waterbirds use these ponds annually as nesting and foraging habitat. Islands within ponds are particularly important habitat for nesting, foraging, and roosting waterbirds. To maintain current waterbird populations, the South Bay Salt Pond Restoration Project plans to create new islands within former salt ponds in South San Francisco Bay. In a series of studies, we investigated pond and individual island attributes that are most beneficial to nesting, foraging, and roosting waterbirds.

  6. Lower Red River Meadow Restoration Project : Biennial Report 1996-97.

    LRK Communications; Wildlife Habitat Institute; Pocket Water, Inc.

    2003-07-01

    The Red River has been straightened and the riparian vegetation corridor eliminated in several reaches within the watershed. The river responded by incision resulting in over-steepened banks, increased sedimentation, elevated water temperatures, depressed groundwater levels, reduced floodplain function, and degraded fish habitat. The Lower Red River Meadow Restoration Project is a multi-phase ecosystem enhancement effort that restores natural physical and biological processes and functions to stabilize the stream channel and establish high quality habitats for fish and wildlife. A natural channel restoration philosophy guides the design and on the ground activities, allowing the channel to evolve into a state of dynamic equilibrium. Two years of planning, two years of restoration in Phases I and II, and one year post-restoration monitoring are complete. By excavating new bends and reconnecting historic meanders, Phase I and II channel realignment increased channel length by 3,060 feet, decreased channel gradient by 25 percent, and increased sinuosity from 1.7 to 2.3. Cross-sectional shapes and point bars were modified to maintain deep pool habitat at low flow and to reconnect the meadow floodplain. Improved soil moisture conditions will help sustain the 31,500 native riparian plantings reestablished within these two phases. Overall, short-term restoration performance was successful. Analyses of long-term parameters document either post-restoration baseline conditions or early stages of evolution toward desired conditions. An adaptive management strategy has helped to improve restoration designs, methods, and monitoring. Lessons learned are being transferred to a variety of audiences to advance the knowledge of ecological restoration and wise management of watersheds.

  7. The Whiteside Run restoration project: Wetlands and stream mitigation and restoration of a previously polluted stream

    Bigatel, A.; Hellier, W.W.; Forman, J.G.; Kepler, S.

    1998-01-01

    An 841,000 m 3 coal refuse pile from the operation of a now abandoned Lower Kitanning (B) coal deep mine had been the source of over 95% of the mine drainage pollution in Whiteside Run, a tributary of Moshannon Creek in Gulich and Woodward Townships, Clearfield County, Pennsylvania. Representative water quality upstream of the refuse pile was: pH = 6.9; alkalinity = 31 and acidity = 0 mg/L as CaCO 3 equivalent; [Fe] = 0.85 mg/L; [Mn] = 0.31 mg/L; and [Al] = 0.25 mg/L. Representative water quality downstream of the refuse pile before th project was: pH = 3.0; alkalinity = 0 and acidity = 358 mg/L as CaCO 3 equivalent; [Fe] = 7.08 mg/L; [Mn] = 0.81 mg/L; and [Al] = 46.86 mg/L. Present downstream water quality is: pH = 5.9; alkalinity = 14.3 and acidity = 8.1 mg/L as CaCO 3 equivalent; [Fe] = 1.57 mg/L; [Mn] = 0.92 mg/L; and [Al] = 0.97 mg/L. There has been a significant improvement in the diversity of aquatic life since the project was undertaken. Power Operating Co., Inc., a local coal mining company, applied for authorization to conduct coal mining activities which would affect a wetland with an area of 1.7 ha and 790 m of an unnamed tributary of Moshannon Creek. Although part of this wetland was anthropogenic, having developed because earlier mining activities by others had affected the channel of the unnamed tributary of Moshannon Creek, the major portion of the area was a natural wetland. Power Operating developed 2.6 ha (6.5 ac) of constructed wetlands to replace the wetland disturbed by mining. The refuse pile was removed and placed in the backfilled area of Power's adjacent surface mine permit, and the mitigation wetland was constructed on the area formerly occupied by the refuse pile. As a result, 6.4 km (4 mi) of formerly polluted stream are now capable of supporting fish

  8. Lower Klickitat Riparian and In-channel Habitat Restoration Project, Annual Report 2001-2002.

    Conley, Will

    2003-10-01

    This project focuses on the lower Klickitat River and its tributaries that provide or affect salmonid habitat. The overall goal is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of watersheds supporting anadromous fish production, particularly steelhead (Oncorhyncus mykiss) which are listed as 'Threatened' within the Mid-Columbia ESU. Restoration activities are aimed at restoring stream processes by removing or mitigating watershed perturbances and improving habitat conditions and water quality. In addition to steelhead, habitat improvements benefit Chinook (O. tshawytscha) and coho (O. kisutch) salmon, resident rainbow trout, and enhance habitat for many terrestrial and amphibian wildlife species. Protection activities compliment restoration efforts within the subbasin by securing refugia and preventing degradation. Since 90% of the project area is in private ownership, maximum effectiveness will be accomplished via cooperation with state, federal, tribal, and private entities. The project addresses goals and objectives presented in the Klickitat Subbasin Summary and the 1994 NWPPC Fish and Wildlife Program. Feedback from the 2000 Provincial Review process indicated a need for better information management to aid development of geographic priorities. Thus, an emphasis has been placed on database development and a review of existing information prior to pursuing more extensive implementation. Planning and design was initiated on several restoration projects. These priorities will be refined in future reports as the additional data is collected and analyzed. Tasks listed are for the April 1, 2001 to August 31, 2002 contract cycle, for which work was delayed during the summer of 2001 because the contract was not finalized until mid-August 2001. Accomplishments are provided for the September 1, 2001 to August 31, 2002 reporting period. During this reporting period

  9. The Pen Branch Project: Restoration of a Forested Wetland in South Carolina

    Randall K. Kolka; Eric A. Nelson; Ronald E. Bonar; Neil C. Dulohery; David Gartner

    1998-01-01

    The Pen Branch Project is a program to restore a forested riparian wetland that has been subject to thermal disturbance caused by nuclear reactor operations at the Department of Energy's (DOE) Savannah River Site (SRS), an 80,200-hectare nuclear facility located in South Carolina. Various levels of thermal discharges to streams located across the US. have occurred...

  10. 76 FR 70955 - Helena Nation Forest: Dalton Mountain Forest Restoration & Fuels Reduction Project

    2011-11-16

    ... DEPARTMENT OF AGRICULTURE Forest Service Helena Nation Forest: Dalton Mountain Forest Restoration & Fuels Reduction Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The Helena National Forest (HNF) is proposing on the Lincoln Ranger...

  11. 77 FR 18997 - Rim Lakes Forest Restoration Project; Apache-Sitgreavese National Forest, Black Mesa Ranger...

    2012-03-29

    ... DEPARTMENT OF AGRICULTURE Forest Service Rim Lakes Forest Restoration Project; Apache-Sitgreavese National Forest, Black Mesa Ranger District, Coconino County, AZ AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The U.S. Forest Service (FS) will...

  12. Protocols for Monitoring Habitat Restoration Projects in the Lower Columbia River and Estuary

    Roegner, G. Curtis; Diefenderfer, Heida L.; Borde, Amy B.; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Zimmerman, Shon A.; Johnson, Gary E.

    2008-04-25

    Protocols for monitoring salmon habitat restoration projects are essential for the U.S. Army Corps of Engineers' environmental efforts in the Columbia River estuary. This manual provides state-of-the science data collection and analysis methods for landscape features, water quality, and fish species composition, among others.

  13. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    2012-04-20

    ...-FF08RSFC00] Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental... environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and..., while providing public access and recreational and educational opportunities compatible with ecological...

  14. A demonstration project to test ecological restoration of a pinyon-juniper ecosystem

    David W. Huffman; Michael T. Stoddard; Peter Z. Fule; W. Wallace Covington; H. B. Smith

    2008-01-01

    To test an approach for restoring historical stand densities and increasing plant species diversity of a pinyon-juniper ecosystem, we implemented a demonstration project at two sites (CR and GP) on the Grand Canyon-Parashant National Monument in northern Arizona. Historical records indicated that livestock grazing was intensive on the sites beginning in the late 1800s...

  15. Evaluating the ecological economic success of riparian restoration projects in Arizona (Abstract)

    Gary B. Snider

    2000-01-01

    The past 4 years the Arizona Water Protection Fund provided more than $25 million to individuals and organizations for stream and riparian restoration projects in Arizona. Information which increases the awareness of the value of Arizona's riparian systems is crucial to the incorporation of ecosystem services into decision-making frameworks, which are largely...

  16. A summary of the environmental restoration program retrieval demonstration project at the Idaho National Engineering Laboratory

    McQuary, J.

    1991-02-01

    This report provides a summary of the Environmental Restoration Program's Retrieval Demonstration Project at the Idaho National Engineering Laboratory. This project developed concepts for demonstrating facilities and equipment for the retrieval of buried transuranic mixed waste at the INEL. Included is a brief assessment of the viability, cost effectiveness, and safety of retrieval based on the developed concept. Changes made in Revision 1 reflect editorial changes only. 31 refs., 1 fig

  17. Conceptual design report for tank farm restoration and safe operations, project W-314

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  18. Effects of national ecological restoration projects on carbon sequestration in China from 2001 to 2010.

    Lu, Fei; Hu, Huifeng; Sun, Wenjuan; Zhu, Jiaojun; Liu, Guobin; Zhou, Wangming; Zhang, Quanfa; Shi, Peili; Liu, Xiuping; Wu, Xing; Zhang, Lu; Wei, Xiaohua; Dai, Limin; Zhang, Kerong; Sun, Yirong; Xue, Sha; Zhang, Wanjun; Xiong, Dingpeng; Deng, Lei; Liu, Bojie; Zhou, Li; Zhang, Chao; Zheng, Xiao; Cao, Jiansheng; Huang, Yao; He, Nianpeng; Zhou, Guoyi; Bai, Yongfei; Xie, Zongqiang; Tang, Zhiyao; Wu, Bingfang; Fang, Jingyun; Liu, Guohua; Yu, Guirui

    2018-04-17

    The long-term stressful utilization of forests and grasslands has led to ecosystem degradation and C loss. Since the late 1970s China has launched six key national ecological restoration projects to protect its environment and restore degraded ecosystems. Here, we conducted a large-scale field investigation and a literature survey of biomass and soil C in China's forest, shrubland, and grassland ecosystems across the regions where the six projects were implemented (∼16% of the country's land area). We investigated the changes in the C stocks of these ecosystems to evaluate the contributions of the projects to the country's C sink between 2001 and 2010. Over this decade, we estimated that the total annual C sink in the project region was 132 Tg C per y (1 Tg = 10 12 g), over half of which (74 Tg C per y, 56%) was attributed to the implementation of the projects. Our results demonstrate that these restoration projects have substantially contributed to CO 2 mitigation in China.

  19. Reengineering of Analytical Data Management for the Environmental Restoration Project at Los Alamos National Laboratory

    Bolivar, S.; Dorries, A.; Nasser, K.; Scherma, S.

    2003-01-01

    The Environmental Restoration (ER) Project at Los Alamos National Laboratory (LANL) is responsible for the characterization, clean up, and monitoring of over 2,124 identified potential release sites (PRS). These PRSs have resulted from operations associated with weapons and energy related research which has been conducted at LANL since 1942. To accomplish mission goals, the ER Project conducts field sampling to determine possible types and levels of chemical contamination as well as their geographic extent. Last fiscal year, approximately 4000 samples were collected during ER Project field sampling campaigns. In the past, activities associated with field sampling such as sample campaign planning, paperwork, shipping and analytical laboratory tracking; verification and order fulfillment; validation and data quality assurance were performed by multiple groups working with a variety of software applications, databases and hard copy reports. This resulted in significant management and communication difficulties, data delivery delays, and inconsistent processes; it also represented a potential threat to overall data integrity. Creation of an organization, software applications and a data process that could provide for cost-effective management of the activities and data mentioned above became a management priority, resulting in a development of a reengineering task. This reengineering effort--currently nearing completion--has resulted in personnel reorganization, the development of a centralized data repository, and a powerful web-based sample management system that allows for an appreciably streamlined and more efficient data process. These changes have collectively cut data delivery times, allowed for larger volumes of samples and data to be handled with fewer personnel, and resulted in significant cost savings. This paper will provide a case study of the reengineering effort undertaken by the ER Project of its analytical data management process. It includes

  20. Reengineering of Analytical Data Management for the Environmental Restoration Project at Los Alamos National Laboratory

    Bolivar, S.; Dorries, A.; Nasser, K.; Scherma, S.

    2003-02-27

    The Environmental Restoration (ER) Project at Los Alamos National Laboratory (LANL) is responsible for the characterization, clean up, and monitoring of over 2,124 identified potential release sites (PRS). These PRSs have resulted from operations associated with weapons and energy related research which has been conducted at LANL since 1942. To accomplish mission goals, the ER Project conducts field sampling to determine possible types and levels of chemical contamination as well as their geographic extent. Last fiscal year, approximately 4000 samples were collected during ER Project field sampling campaigns. In the past, activities associated with field sampling such as sample campaign planning, paperwork, shipping and analytical laboratory tracking; verification and order fulfillment; validation and data quality assurance were performed by multiple groups working with a variety of software applications, databases and hard copy reports. This resulted in significant management and communication difficulties, data delivery delays, and inconsistent processes; it also represented a potential threat to overall data integrity. Creation of an organization, software applications and a data process that could provide for cost-effective management of the activities and data mentioned above became a management priority, resulting in a development of a reengineering task. This reengineering effort--currently nearing completion--has resulted in personnel reorganization, the development of a centralized data repository, and a powerful web-based sample management system that allows for an appreciably streamlined and more efficient data process. These changes have collectively cut data delivery times, allowed for larger volumes of samples and data to be handled with fewer personnel, and resulted in significant cost savings. This paper will provide a case study of the reengineering effort undertaken by the ER Project of its analytical data management process. It includes

  1. Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project

    N/A

    2004-08-11

    The Bonneville Power Administration is proposing to fund the restoration of approximately 500 feet of streambank along the Yakima River at river mile 8, upstream of the Van Giesen Bridge on SR 224, in and between Richland and West Richland, Washington. This project will also result in the acquisition of Fox Island, a 12-acre island directly across the river from the restoration area. There is no development planned for the island. The proposed project includes: The installation of a bio-engineered streambank that incorporates barbs to capture silt and deflect flow, roughened rock or log toes, a riparian buffer, soil reinforcement, and bank grading. Long-term photo-point and plot sampling will also be implemented to evaluate the effectiveness and success of the restoration project. The NEPA compliance checklist for this project was completed by Darrel Sunday, a contractor with Sunday and Associates, Inc. (April 4, 2004), and meets the standards and guidelines for the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Endangered Species Act (ESA) listed species that may occur in the general vicinity of the project area are the pygmy rabbit, bald eagle, bull trout, Ute ladies'-tresses, and mid-Columbia Steelhead. The pygmy rabbit, bald eagle, and Ute ladies'Tresses are not known to occur in the immediate project vicinity, and it was determined that the proposed restoration project would have no effect on these species. It is difficult to determine if bull trout occur within the Tapteal project area and Dave Carl of the Washington Department of Fish & Wildlife was contacted and concurred with this assumption. It was determined that the project may affect, but is not likely to adversely affect bull trout, and the U.S. Fish & Wildlife Service has concurred with that determination (July 28, 2004). For the mid-Columbia Steelhead, an anadromous fish species, BPA has determined that if conducted in accordance with

  2. Use of the geometric mean of opposing planar projections in pre-reconstruction restoration of SPECT images

    Boulfelfel, D.; Rangayyan, R.M.; Hahn, L.J.; Kloiber, R.

    1992-01-01

    This paper presents a restoration scheme for single photon emission computed tomography (SPECT) images that performs restoration before reconstruction (pre-reconstruction restoration) from planar (projection) images. In this scheme, the pixel-by-pixel geometric mean of each pair of opposing (conjugate) planar projections is computed prior to the reconstruction process. The averaging process is shown to help in making the degradation phenomenon less dependent on the distance of each point of the object from the camera. The restoration filters investigated are the Wiener and power spectrum equalization filters. (author)

  3. Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project: FY 1994--FY 2001

    1993-12-01

    This Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993

  4. Natural resource risk and cost management in environmental restoration: Demonstration project at the Savannah River Site

    Bascietto, J.J.; Sharples, F.E.

    1995-01-01

    The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff's understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues

  5. Exxon Valdez oil spill restoration project final report: Prince William Sound Herring disease program (HDP), restoration project 070819

    Hershberger, Paul; Elliott, Diane G.; Emmenegger, Eveline J.; Hansen, John D.; Kurath, Gael; Winton, James R.; Kocan, Richard; LaPatra, Scott

    2011-01-01

    Surveys of pathogens in Pacific herring from 2007 – 2010 indicated that Ichthyophonus, viral hemorrhagic septicemia virus, and erythrocytic necrosis virus are endemic in Prince William Sound and throughout the NE Pacific. Laboratory studies with VHSV indicated that multiple herring stocks are equally susceptible to the resulting disease, Pacific herring shed copious levels of VHSV (as high at 5x108 plaque-forming units/day) shortly after exposure, chronic and persistent infections can occur in Pacific herring, susceptibility of Pacific herring to VHS extends to the larval life stages but not the embryonic stages, and the prior exposure history of Pacific herring to VHSV can be determined post hoc. Laboratory studies involving Ichthyophonus indicated that schizonts can be inactivated with chlorine and iodine solutions, the parasite can survive for extended periods in saltwater but not freshwater, a low potential exists for cross contamination between in vitro explant cultures, infectious schizonts are released from the skin surface of infected herring, schizonts are not uniformly distributed throughout the skeletal muscle of infected Pacific herring, multiple types of Ichthyophonus exist with different genotypes and phenotypic traits, and temperature is an important factor influencing the infectivity of Ichthyophonus. Additional field and laboratory studies indicated that Ichthyophonus negatively influences the swimming performance of infected hosts and the negative impacts effects are exacerbated by increasing temperatures, American shad are an important reservoir of Ichthyophonus in the NE Pacific, Pacific herring are not susceptible to infectious hematopoietic necrosis (IHN), and Pacific herring will accept surgically implanted acoustic tags with negligible impacts on survival.

  6. WE-AB-207A-02: John’s Equation Based Consistency Condition and Incomplete Projection Restoration Upon Circular Orbit CBCT

    Ma, J; Qi, H; Wu, S; Xu, Y; Zhou, L; Yan, H

    2016-01-01

    Purpose: In transmitted X-ray tomography imaging, projections are sometimes incomplete due to a variety of reasons, such as geometry inaccuracy, defective detector cells, etc. To address this issue, we have derived a direct consistency condition based on John’s Equation, and proposed a method to effectively restore incomplete projections based on this consistency condition. Methods: Through parameter substitutions, we have derived a direct consistency condition equation from John’s equation, in which the left side is only projection derivative of view and the right side is projection derivative of other geometrical parameters. Based on this consistency condition, a projection restoration method is proposed, which includes five steps: 1) Forward projecting reconstructed image and using linear interpolation to estimate the incomplete projections as the initial result; 2) Performing Fourier transform on the projections; 3) Restoring the incomplete frequency data using the consistency condition equation; 4) Performing inverse Fourier transform; 5) Repeat step 2)∼4) until our criteria is met to terminate the iteration. Results: A beam-blocking-based scatter correction case and a bad-pixel correction case were used to demonstrate the efficacy and robustness of our restoration method. The mean absolute error (MAE), signal noise ratio (SNR) and mean square error (MSE) were employed as our evaluation metrics of the reconstructed images. For the scatter correction case, the MAE is reduced from 63.3% to 71.7% with 4 iterations. Compared with the existing Patch’s method, the MAE of our method is further reduced by 8.72%. For the bad-pixel case, the SNR of the reconstructed image by our method is increased from 13.49% to 21.48%, with the MSE being decreased by 45.95%, compared with linear interpolation method. Conclusion: Our studies have demonstrated that our restoration method based on the new consistency condition could effectively restore the incomplete projections

  7. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final environmental assessment

    1994-01-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities

  8. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  9. Big rock point restoration project BWR major component removal, packaging and shipping - planning and experience

    Milner, T.; Dam, S.; Papp, M.; Slade, J.; Slimp, B.; Nurden, P.

    2001-01-01

    The Big Rock Point boiling water reactor (BWR) at Charlevoix, MI was permanently shut down on August 29th 1997. In 1999 BNFL Inc.'s Reactor Decommissioning Group (RDG) was awarded a contract by Consumers Energy (CECo) for the Big Rock Point (BRP) Major Component Removal (MCR) project. BNFL Inc. RDG has teamed with MOTA, Sargent and Lundy and MDM Services to plan and execute MCR in support of the facility restoration project. The facility restoration project will be completed by 2005. Key to the success of the project has been the integration of best available demonstrated technology into a robust and responsive project management approach, which places emphasis on safety and quality assurance in achieving project milestones linked to time and cost. To support decommissioning of the BRP MCR activities, a reactor vessel (RV) shipping container is required. Discussed in this paper is the design and fabrication of a 10 CFR Part 71 Type B container necessary to ship the BRP RV. The container to be used for transportation of the RV to the burial site was designed as an Exclusive Use Type B package for shipment and burial at the Barnwell, South Carolina (SC) disposal facility. (author)

  10. Sediment cores and chemistry for the Kootenai River White Sturgeon Habitat Restoration Project, Boundary County, Idaho

    Barton, Gary J.; Weakland, Rhonda J.; Fosness, Ryan L.; Cox, Stephen E.; Williams, Marshall L.

    2012-01-01

    The Kootenai Tribe of Idaho, in cooperation with local, State, Federal, and Canadian agency co-managers and scientists, is assessing the feasibility of a Kootenai River habitat restoration project in Boundary County, Idaho. This project is oriented toward recovery of the endangered Kootenai River white sturgeon (Acipenser transmontanus) population, and simultaneously targets habitat-based recovery of other native river biota. Projects currently (2010) under consideration include modifying the channel and flood plain, installing in-stream structures, and creating wetlands to improve the physical and biological functions of the ecosystem. River restoration is a complex undertaking that requires a thorough understanding of the river. To assist in evaluating the feasibility of this endeavor, the U.S. Geological Survey collected and analyzed the physical and chemical nature of sediment cores collected at 24 locations in the river. Core depths ranged from 4.6 to 15.2 meters; 21 cores reached a depth of 15.2 meters. The sediment was screened for the presence of chemical constituents that could have harmful effects if released during restoration activities. The analysis shows that concentrations of harmful chemical constituents do not exceed guideline limits that were published by the U.S. Army Corps of Engineers in 2006.

  11. Assessing the value of the Central Everglades Planning Project (CEPP) in Everglades restoration: an ecosystem service approach

    Richardson, Leslie A.; Keefe, Kelly; Huber, Christopher C.; Racevskis, Laila; Gregg, Reynolds; Thourot, Scott; Miller, Ian

    2014-01-01

    This study identifies a full range of ecosystem services that could be affected by a restoration project in the central Everglades and monetizes the economic value of a subset of these services using existing data. Findings suggest that the project will potentially increase many ecosystem services that have considerable economic value to society. The ecosystem services monetized within the scope of this study are a subset of the difference between the future-with the Central Everglades Planning Project (CEPP) and the future-without CEPP, and they totaled ~ $1.8 billion USD at a 2.5% discount rate. Findings suggest that the use of ecosystem services in project planning and communications may require acknowledgment of the difficulty of monetizing important services and the limitations associated with using only existing data and models. Results of this study highlight the need for additional valuation efforts in this region, focused on those services that are likely to be impacted by restoration activities but were notably challenging to value in this assessment due to shortages of data.

  12. Classifications for Coastal Wetlands Planning, Protection and Restoration Act site-specific projects: 2008 and 2009

    Jones, William R.; Garber, Adrienne

    2012-01-01

    The Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) funds over 100 wetland restoration projects across Louisiana. Integral to the success of CWPPRA is its long-term monitoring program, which enables State and Federal agencies to determine the effectiveness of each restoration effort. One component of this monitoring program is the analysis of high-resolution, color-infrared aerial photography at the U.S. Geological Survey's National Wetlands Research Center in Lafayette, Louisiana. Color-infrared aerial photography (9- by 9-inch) is obtained before project construction and several times after construction. Each frame is scanned on a photogrametric scanner that produces a high-resolution image in Tagged Image File Format (TIFF). By using image-processing software, these TIFF files are then orthorectified and mosaicked to produce a seamless image of a project area and its associated reference area (a control site near the project that has common environmental features, such as marsh type, soil types, and water salinities.) The project and reference areas are then classified according to pixel value into two distinct classes, land and water. After initial land and water ratios have been established by using photography obtained before and after project construction, subsequent comparisons can be made over time to determine land-water change. Several challenges are associated with the land-water interpretation process. Primarily, land-water classifications are often complicated by the presence of floating aquatic vegetation that occurs throughout the freshwater systems of coastal Louisiana and that is sometimes difficult to differentiate from emergent marsh. Other challenges include tidal fluctuations and water movement from strong winds, which may result in flooding and inundation of emergent marsh during certain conditions. Compensating for these events is difficult but possible by using other sources of imagery to verify marsh conditions for other

  13. Urban river design and aesthetics: A river restoration case study from the UK

    Prior, Jonathan

    2016-01-01

    This paper analyses the restoration of an urbanized section of the River Skerne where it flows through a suburb of Darlington, England; a project which was one of the first comprehensive urban river restorations undertaken in the UK. It is shown how aesthetic values were central to the identification of the River Skerne as a site for restoration, the production of restoration objectives, and a design vision of urban river renewal via restoration. Secondly, the means by which these aesthetic v...

  14. Towards a decision support system for stream restoration in the Netherlands: an overview of restoration projects and future needs

    Verdonschot, P.F.M.; Nijboer, R.C.

    2002-01-01

    Stream restoration is one of the answers to the lowland stream deterioration. For making proper choices in stream restoration, one firstly needs to understand the complex spatial and temporal interactions between physical, chemical and biological components in the stream ecosystem. Several

  15. The restoration project : decontamination of facilities from chemical, biological and radiological contamination after terrorist action

    Fingas, M.; Volchek, K.; Thouin, G.; Harrison, S.; Kuang, W. [Environment Canada, Ottawa, ON (Canada). Emergencies Science Div; Velicogna, D.; Hornof, M.; Punt, M. [SAIC Canada, Ottawa, ON (Canada); Payette, P.; Duncan, L.; Best, M.; Krishnan; Wagener, S.; Bernard, K.; Majcher, M. [Public Health Agency of Canada, Ottawa, ON (Canada); Cousins, T.; Jones, T. [Defence Research and Development Canada, Ottawa, ON (Canada)

    2005-07-01

    Bioterrorism poses a real threat to the public health and national security, and the restoration of affected facilities after a chemical, biological or radiological attack is a major concern. This paper reviewed aspects of a project conducted to collect information, test and validate procedures for site restoration after a terrorist attack. The project began with a review of existing technology and then examined new technologies. Restoration included pickup, neutralization, decontamination, removal and final destruction and deposition of contaminants as well as cleaning and neutralization of material and contaminated waste from decontamination. The project was also intended to test existing concepts and develop new ideas. Laboratory scale experiments consisted of testing, using standard laboratory techniques. Radiation decontamination consisted of removal and concentration of the radioisotopes from removal fluid. General restoration guidelines were provided, as well as details of factors considered important in specific applications, including growth conditions and phases of microorganisms in biological decontamination, or the presence of inhibitors or scavengers in chemical decontamination. Various agents were proposed that were considered to have broad spectrum capability. Test surrogates for anthrax were discussed. The feasibility of enhanced oxidation processes was examined in relation to the destruction of organophosphorus, organochlorine and carbamate pesticides. The goal was to identify a process for the treatment of surfaces contaminated with pesticides. Tests included removal from carpet, porous ceiling tile, steel plates, and floor tiles. General radiation contamination procedures and techniques were reviewed, as well as radiological decontamination waste treatment. It was concluded that there is no single decontamination technique applicable for all contaminants, and decontamination methods depend on economic, social and health factors. The amount of

  16. Recommendations for computer modeling codes to support the UMTRA groundwater restoration project

    Tucker, M.D. [Sandia National Labs., Albuquerque, NM (United States); Khan, M.A. [IT Corp., Albuquerque, NM (United States)

    1996-04-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Project is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the US. The surface restoration phase, which includes containment and stabilization of the abandoned uranium mill tailings piles, has a specific termination date and is nearing completion. Therefore, attention has now turned to the groundwater restoration phase, which began in 1991. Regulated constituents in groundwater whose concentrations or activities exceed maximum contaminant levels (MCLs) or background levels at one or more sites include, but are not limited to, uranium, selenium, arsenic, molybdenum, nitrate, gross alpha, radium-226 and radium-228. The purpose of this report is to recommend computer codes that can be used to assist the UMTRA groundwater restoration effort. The report includes a survey of applicable codes in each of the following areas: (1) groundwater flow and contaminant transport modeling codes, (2) hydrogeochemical modeling codes, (3) pump and treat optimization codes, and (4) decision support tools. Following the survey of the applicable codes, specific codes that can best meet the needs of the UMTRA groundwater restoration program in each of the four areas are recommended.

  17. Recommendations for computer modeling codes to support the UMTRA groundwater restoration project

    Tucker, M.D.; Khan, M.A.

    1996-04-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Project is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the US. The surface restoration phase, which includes containment and stabilization of the abandoned uranium mill tailings piles, has a specific termination date and is nearing completion. Therefore, attention has now turned to the groundwater restoration phase, which began in 1991. Regulated constituents in groundwater whose concentrations or activities exceed maximum contaminant levels (MCLs) or background levels at one or more sites include, but are not limited to, uranium, selenium, arsenic, molybdenum, nitrate, gross alpha, radium-226 and radium-228. The purpose of this report is to recommend computer codes that can be used to assist the UMTRA groundwater restoration effort. The report includes a survey of applicable codes in each of the following areas: (1) groundwater flow and contaminant transport modeling codes, (2) hydrogeochemical modeling codes, (3) pump and treat optimization codes, and (4) decision support tools. Following the survey of the applicable codes, specific codes that can best meet the needs of the UMTRA groundwater restoration program in each of the four areas are recommended

  18. Have wet meadow restoration projects in the Southwestern U.S. been effective in restoring geomorphology, hydrology, soils, and plant species composition?

    Ramstead Karissa M

    2012-09-01

    Full Text Available Abstract Background Wet meadows occur in numerous locations throughout the American Southwest, but in many cases have become heavily degraded. Among other things they have frequently been overgrazed and have had roads built through them, which have affected the hydrology of these wetland ecosystems. Because of the important hydrologic and ecological functions they are believed to perform, there is currently significant interest in wet meadow restoration. Several restoration projects have been completed recently or are underway in the region, sometimes at considerable expense and with minimal monitoring. The objective of this review was to evaluate the effects of wet meadow restoration projects in the southwestern United States on geomorphology, hydrology, soils and plant species composition. A secondary objective was to determine the effects of wet meadow restoration projects on wildlife. Methods Electronic databases, internet search engines, websites and personal contacts were used to find articles of relevance to this review. Articles were filtered by title, abstract and full text. Summary information for each of the articles remaining after the filtering process was compiled and used to assess the quality of the evidence presented using two different approaches. Results Our searches yielded 48 articles, of which 25 were published in peer-reviewed journals, 14 were monitoring or project reports, and 9 were published in conference proceedings or are unpublished theses or manuscripts. A total of 26 operational-scale restoration projects were identified. A wide range of restoration techniques were employed, ranging from small-scale manipulations of stream channels (e.g., riffle structures to large scale pond-and-plug projects. Other common restoration techniques included fencing to exclude livestock (and sometimes also native ungulates, other forms of grazing management, seeding, and transplanting seedlings. Most of the articles reported that

  19. Landowner and visitor response to forest landscape restoration: the Chequamegon-Nicolet National Forest Northeast Sands Project

    Kristin Floress; Anna Haines; Emily Usher; Paul Gobster; Mike. Dockry

    2018-01-01

    This report is intended to support the ongoing pine barrens restoration on work in the Lakewood-Laona Ranger District on the Chequamegon-Nicolet National Forest (CNNF). The report provides the results from 2016 surveys and focus groups examining landowner and visitor attitudes toward forest management treatments, communication, and restoration project outcomes; their...

  20. 76 FR 70480 - Otay River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National...

    2011-11-14

    ... River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National Wildlife...), intend to prepare an environmental impact statement (EIS) for the proposed Otay River Estuary Restoration... any one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  1. Environmental restoration program pollution prevention checklist guide for the evaluation of alternatives project phase

    1993-09-01

    Evaluation of alternative studies determine what decontamination and decommissioning (D ampersand D) alternatives are presented to regulators for facility and site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best clean-up option. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Evaluation of Alternatives (EV) phase projects of the Environmental Restoration (ER) Program. This guide will assist users with documenting PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to help users implement and evaluate waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves, eliminating expensive process waste assessments and audit teams

  2. Measures to restore metallurgical mine wasteland using ecological restoration technologies: A case study at Longnan Rare Earth Mine

    Rao, Yunzhang; Gu, Ruizhi; Guo, Ruikai; Zhang, Xueyan

    2017-01-01

    Whereas mining activities produce the raw materials that are crucial to economic growth, such activities leave extensive scarring on the land, contributing to the waste of valuable land resources and upsetting the ecological environment. The aim of this study is therefore to investigate various ecological technologies to restore metallurgical mine wastelands. These technologies include measures such as soil amelioration, vegetation restoration, different vegetation planting patterns, and engineering technologies. The Longnan Rare Earth Mine in the Jiangxi Province of China is used as the case study. The ecological restoration process provides a favourable reference for the restoration of a metallurgical mine wasteland.

  3. Project Management Support and Services for the Environmental Restoration and Waste Management. Final report

    1995-01-01

    The Los Alamos National Laboratory (LANL) Environmental Restoration Technical Support Office (ERTSO) contracted Project Time ampersand Cost, Inc. (PT ampersand C) on 16 November 1992 to provide support services to the US Department of Energy (DOE). ERTSO had traditionally supported the DOE Albuquerque office in the Environmental Restoration and Waste Management Programs and had also supported the Office of Waste Management (EM-30) at DOE Headquarters in Germantown, Maryland. PT ampersand C was requested to provide project management and support services for the DOE as well as liaison and coordination of responses and efforts between various agencies. The primary objective of this work was to continue LANL's technical support role to EM-30 and assist in the development of the COE Cost and Schedule Estimating (CASE) Guide for EM-30. PT ampersand C's objectives, as specified in Section B of the contract, were well met during the duration of the project through the review and comment of various draft documents, trips to DOE sites providing program management support and participating in the training for the EM-30 Cost and Schedule Estimating Guide, drafting memos and scheduling future projects, attending numerous meetings with LANL, DOE and other subcontractors, and providing written observations and recommendations.he results obtained were determined to be satisfactory by both the LANL ERTSO and DOE EM-30 organizations. The objective to further the support from LANL and their associated subcontractor (PT ampersand C) was met. The contract concluded with no outstanding issues

  4. Restoration of groundwater after solution mining at the Highland Uranium Project, Wyoming, USA

    Hunter, J. [Waste Technology Group, British Nuclear Fuels PLC, Risley, Warrington (United Kingdom); Huffman, L. [Power Resources Inc., Highland Uranium Mine, Glenrock, Wyoming (United States)

    2000-07-01

    The Highland Project, located in Converse County, Wyoming, has had a successful 11 year history of in-situ leach mining of Tertiary roll-front uranium deposits. The uranium ore is oxidized and solubilized by circulating native groundwater, containing additional dissolved O{sub 2} and CO{sub 2}, within confined fluvial aquifers at depths of 200 - 250 m. The changing chemistry of this groundwater during leaching is discussed, as are the various treatment techniques that have been used to restore this fluid at the end of mining. Examples are provided which demonstrate the varying effectiveness of each technique for the reduction of elevated concentrations of different groundwater parameters. The complications arising from the proximity of the earliest wellfields to abandoned, conventional mine workings, as well as unexpected side effects from each restoration method, have combined to make an interesting case history from this long established mining operation. (author)

  5. Assessing data quality for a federal environmental restoration project: Rationalizing the requirements of multiple clients

    Kiszka, V.R.; Carlsen, T.M.

    1994-07-01

    Most environmental restoration projects at federal facilities face the difficult task of melding the quality assurance (QA) requirements of multiple clients, as well as dealing with historical data that are often of unknown quality. At Lawrence Livermore National Laboratory (LLNL), we have successfully integrated the requirements of our multiple clients by carefully developing a QA program that efficiently meets our clients' needs. The Site 300 Experimental Test Site is operated by LLNL in support of its national defense program. The responsibility for conducting environmental contaminant investigations and restoration at Site 300 is vested in the Site 300 Environmental Restoration Project (Site 300 ERP) of LLNL's Environmental Restoration Division. LLNL Site 300 ERP must comply with the QA requirements of several clients, which include: the LLNL Environmental Protection Department, the DOE, the US Environmental Protection Agency-Region IX (EPA), the California Regional Water Quality Control Board -- Central Valley Region, and the California Department of Toxic Substances Control. This comprehensive QA program was used to determine the acceptability of historical data. The Site 300 ERP began soil and ground water investigations in 1982. However, we did not begin receiving analytical quality assurance/quality control (QA/QC) data until 1989; therefore, the pre-1989 data that were collected are of unknown quality. The US EPA QAMS-005/80 defines data quality as the totality of features and characteristics of data that bears on its ability to satisfy a given purpose. In the current context, the characteristics of major importance are accuracy, precision, completeness, representativeness, and comparability. Using our established QA program, we determined the quality of this historical data based on its comparability to the post-1989 data. By accepting this historical data, we were able to save a considerable amount of money in recharacterization costs

  6. 10 years after the largest river restoration project in Northern Europe

    Astrup Kristensen, Esben Astrup; Kronvang, B.; Wiberg-Larsen, P.

    2014-01-01

    that erosion and sedimentation have changed the cross-sectional profiles over the last 10 years, resulting in a net input of sediment to the lower reaches of the river. However, the change of channel form was a slow process and predicted bank retreat over a 100 year period was only up to 6.8 m. Hence......The lower river Skjern (Denmark) historically contained a large variation in habitats and the river ran through large areas with wetlands, many backwaters, islands and oxbow lakes. During the 1960s the river was channelized and the wetland drained. A restoration during 2001–2002 transformed 19 km...... of channelized river into 26 km meandering river. The short-term effects of this restoration have previously been reported and for this study we revisited the river and with new data evaluated the long-term (10 years) hydrological effects of the restoration. The evaluation was done on three different scales: (1...

  7. Restoration and construction (buildings). Solar electric power. How to complete a photovoltaic project

    Bareau, Helene; Juniere, Olivier

    2017-10-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic but comprehensive outlook on the way to complete a solar photovoltaic project in the cases of the restoration or the construction of a building. After a presentation of solar energy, its transformation into electric power, and the installation of solar photovoltaic panels and equipment, the brochure exposes the various steps of a photovoltaic project: economic analysis (cost estimation, budgets, financing incentives, power prices, the choice between selling or using electric power, the contracts, etc.), the planning of the project, the administrative procedure, the selection of a professional installer, how to run the photovoltaic system, how to run the business, etc

  8. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  9. Independent technical review of the Sandia National Laboratories Environmental Restoration Project

    1994-11-01

    An Independent Technical Review was conducted of the Environmental Restoration Project. The objective of the review was recommendations, from a commercial perspective, on a systems level path forward to safe, minimum cost and schedule project completion. The work presented represents the consensus analysis and recommendations of thirteen individuals with varied backgrounds, expertise, and experience. The ITR team recommends that the barriers to the opportunity described in the diagnosis be eliminated using an integrated DOE-Sandia system approach. Piecemeal changes will not result in the desired commercial efficiency. DOE needs to operate as the contracting agency for a Major System Acquisition. If it does not, commercial performance will not be achieved regardless of the contractor. Likewise, Sandia needs to establish and implement the necessary project structure and management systems to operate with commercial contractor like efficiency

  10. Using Geomorphic Change Detection to Understand Restoration Project Success Relative to Stream Size

    Yeager, A.; Segura, C.

    2017-12-01

    Large wood (LW) jams have long been utilized as a stream restoration strategy to create fish habitat, with a strong focus on Coho salmon in the Pacific Northwest. These projects continue to be implemented despite limited understanding of their success in streams of different size. In this study, we assessed the changes triggered by LW introductions in 10 alluvial plane bed reaches with varying drainage areas (3.9-22 km²) and bankfull widths (6.4-14.7 m) in one Oregon Coast Range basin. In this basin, LW was added in an effort to improve winter rearing habitat for Coho salmon. We used detailed topographic mapping (0.5 m² resolution) to describe the local stream and floodplain geometry. Pebble counts were used to monitor changes in average substrate size after the LW addition. Field surveys were conducted immediately after the LW were installed, in the summer of 2016, and one year after installation, in the summer of 2017. We used geomorphic change detection analysis to quantify the amount of scour and deposition at each site along with changes in average bankfull width. Then we determined the relative amount of change among all sites to identify which size stream changed the most. We also modeled fluctuations in water surface elevation at each site, correlating frequency and inundation of the LW with geomorphic changes detected from the topographic surveys. Preliminary results show an increase in channel width and floodplain connectivity at all sites, indicating an increase in off-channel habitat for juvenile Coho salmon. Bankfull widths increased up to 75% in small sites and up to 25% in large sites. Median grain size became coarser in large streams (increased up to 20%), while we saw a similar amount of fining at smaller sites. The overall increase in channel width is compensated by an overall decrease in bed elevation at both large and small sites, suggesting the maintenance of overall geomorphic equilibrium. Further work will include quantifying these

  11. Hangman Restoration Project : Annual Report, August 1, 2001 - July 31, 2002.

    Green, Gerald I.; Coeur D' Alene Tribe.

    2002-06-01

    The construction of hydroelectric facilities in the Columbia Basin resulted in the extirpation of anadromous fish stocks in Hangman Creek and its tributaries within the Coeur d'Alene Reservation. Thus, the Coeur d'Alene Indian Tribe was forced to rely more heavily on native fish stocks such as redband trout (Oncorhynchus mykiss garideini), westslope cutthroat trout (O. clarki lewisii) and bull trout (Salvelinus confluentus) as well as local wildlife populations. Additionally, the Tribe was forced to convert prime riparian habitat into agricultural lands to supply sustenance for their changed needs. Wildlife habitats within the portion of the Hangman Creek Watershed that lies within the Coeur d'Alene Indian Reservation have been degraded from a century of land management practices that include widespread conversion of native habitats to agricultural production and intensive silvicultural practices. Currently, wildlife and fish populations have been marginalized and water quality is significantly impaired. In the fall of 2000 the Coeur d'Alene Tribe Wildlife Program, in coordination with the Tribal Fisheries Program, submitted a proposal to begin addressing the degradations to functioning habitats within the Coeur d'Alene Reservation in the Hangman Watershed. That proposal led to the implementation of this project during BPA's FY2001 through FY2003 funding cycle. The project is intended to protect, restore and/or enhance priority riparian, wetland and upland areas within the headwaters of Hangman Creek and its tributaries in order to promote healthy self-sustaining fish and wildlife populations. A key goal of this project is the implementation of wildlife habitat protection efforts in a manner that also secures areas with the potential to provide stream and wetland habitats essential to native salmonid populations. This goal is critical in our efforts to address both resident fish and wildlife habitat needs in the Hangman Watershed. All

  12. Sulimar Queen environmental restoration project closure package Sandia environmental stewardship exemplar.

    Tillman, Jack B.

    2008-09-01

    In March 2008, Sandia National Laboratories (Sandia), in partnership with the Bureau of Land Management, Roswell Field Office, completed its responsibilities to plug and abandon wells and restore the surface conditions for the Sulimar Queens Unit, a 2,500 acre oil field, in Chaves County, Southeast New Mexico. Sandia assumed this liability in an agreement to obtain property to create a field laboratory to perform extensive testing and experimentation on enhanced oil recovery techniques for shallow oil fields. In addition to plugging and abandoning 28 wells, the project included the removal of surface structures and surface reclamation of disturbed lands associated with all plugged and abandoned wells, access roads, and other auxiliary facilities within unit boundaries. A contracting strategy was implemented to mitigate risk and reduce cost. As the unit is an important wildlife habitat for prairie chickens, sand dune lizards, and mule deer, the criteria for the restoration and construction process were designed to protect and enhance the wildlife habitat. Lessons learned from this project include: (1) extreme caution should be exercised when entering agreements that include future liabilities, (2) partnering with the regulator has huge benefits, and (3) working with industry experts, who were familiar with the work, and subcontractors, who provided the network to complete the project cost effectively.

  13. Summary of operations and performance of the Murdock site restoration project in 2008.

    LaFreniere, L. M.; Environmental Science Division

    2009-06-04

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A.

  14. The 12-foot pressure wind tunnel restoration project model support systems

    Sasaki, Glen E.

    1992-01-01

    The 12 Foot Pressure Wind Tunnel is a variable density, low turbulence wind tunnel that operates at subsonic speeds, and up to six atmospheres total pressure. The restoration of this facility is of critical importance to the future of the U.S. aerospace industry. As part of this project, several state of the art model support systems are furnished to provide an optimal balance between aerodynamic and operational efficiency parameters. Two model support systems, the Rear Strut Model Support, and the High Angle of Attack Model Support are discussed. This paper covers design parameters, constraints, development, description, and component selection.

  15. Summary of operations and performance of the Murdock site restoration project in June 2005-December 2006.

    LaFreniere, L. M.; Environmental Science Division

    2007-05-31

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the initial period of systems operation, from June 2005 through December 2006. In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the initial period of operation.

  16. Addressing elder abuse: the Waterloo restorative justice approach to elder abuse project.

    Groh, Arlene; Linden, Rick

    2011-04-01

    The Community Care Access Centre (CCAC) of Waterloo Region, in partnership with a number of other social service agencies, designed and implemented a restorative justice model applicable to older adults who have been abused by an individual in a position of trust. The project was very successful in building partnerships, as many community agencies came together to deal with the problem of elder abuse. The program also raised the profile of elder abuse in the community. However, despite intensive efforts, referrals to the restorative justice program were quite low. Because of this, the program moved to a new organizational model, the Elder Abuse Response Team (EART), which has retained the guiding philosophy of restorative justice but has broadened the mandate. The team has evolved into a conflict management system that has multiple points of entry for cases and multiple options for dealing with elder abuse. The team has developed a broad range of community partners who can facilitate referrals to the EART and also can help to provide an individualized response to each case. The transition to the EART has been successful, and the number of referrals has increased significantly. Copyright © Taylor & Francis Group, LLC

  17. Flood effects on an Alaskan stream restoration project: the value of long-term monitoring

    Densmore, Roseann V.; Karle, Kenneth F.

    2009-01-01

    On a nationwide basis, few stream restoration projects have long-term programs in place to monitor the effects of floods on channel and floodplain configuration and floodplain vegetation, but long-term and event-based monitoring is required to measure the effects of these stochastic events and to use the knowledge for adaptive management and the design of future projects. This paper describes a long-term monitoring effort (15 years) on a stream restoration project in Glen Creek in Denali National Park and Preserve in Alaska. The stream channel and floodplain of Glen Creek had been severely degraded over a period of 80 years by placer mining for gold, which left many reaches with unstable and incised streambeds without functioning vegetated floodplains. The objectives of the original project, initiated in 1991, were to develop and test methods for the hydraulic design of channel and floodplain morphology and for floodplain stabilization and riparian habitat recovery, and to conduct research and monitoring to provide information for future projects in similar degraded watersheds. Monitoring methods included surveyed stream cross-sections, vegetation plots, and aerial, ground, and satellite photos. In this paper we address the immediate and outlying effects of a 25-year flood on the stream and floodplain geometry and riparian vegetation. The long-term monitoring revealed that significant channel widening occurred following the flood, likely caused by excessive upstream sediment loading and the fairly slow development of floodplain vegetation in this climate. Our results illustrated design flaws, particularly in regard to identification and analysis of sediment sources and the dominant processes of channel adjustment.

  18. Viking GCMS Data Restoral and Perceiving Temperature on Other Worlds: Astrobiology Projects at NASA Ames

    Guzman, Melissa

    2015-01-01

    The primary task for the summer was to procure the GCMS data from the National Space Science Data Coordinated Archive (NSSDCA) and to assess the current state of the data set for possible reanalysis opportunities. After procurement of the Viking GCMS data set and analysis of its current state, the internship focus shifted to preparing a plan for restoral and archiving of the GCMS data set. A proposal was prepared and submitted to NASA Headquarters to restore and make available the 8000 mass chromatographs that are the basic data generated by the Viking GCMS instrument. The relevance of this restoral and the methodology we propose for restoral is presented. The secondary task for the summer is to develop a thermal model for the perceived temperature of a human standing on Mars, Titan, or Europa. Traditionally, an equation called "Fanger's comfort equation" is used to measure the perceived temperature by a human in a given reference environment. However, there are limitations to this model when applied to other planets. Therefore, the approach for this project has been to derive energy balance equations from first principles and then develop a methodology for correlating "comfort" to energy balance. Using the -20 C walk-in freezer in the Space Sciences building at NASA Ames, energy loss of a human subject is measured. Energy loss for a human being on Mars, Titan and Europa are calculated from first principles. These calculations are compared to the freezer measurements, e.g. for 1 minute on Titan, a human loses as much energy as x minutes in a -20 C freezer. This gives a numerical comparison between the environments. These energy calculations are used to consider the physiological comfort of a human based on the calculated energy losses.

  19. Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT

    Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

    2012-05-31

    The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

  20. Advanced Monitoring Systems Initiative Project Achievements for Environmental Restoration and Waste Management

    Hohman, E.H.; Lohrstorfer, C.L.; Venedam, R.J.; Weeks, S.J.; Fannin, C.R.

    2006-01-01

    The Advanced Monitoring Systems Initiative (AMSI) project has been in existence since 2002. In this short time period, AMSI has successfully developed, tested and/or demonstrated over 30 advanced sensors and monitoring systems for applications in environmental restoration, waste management and other areas of national interest. This presentation summarizes the AMSI project, and gives examples of recent successes. The purpose of the presentation is to make Symposium attendees aware of AMSI's capabilities and experience, for possible use in the future. Example successes include the following: - Automated hexavalent chromium (Cr(VI)) monitoring in wells alongside the Columbia River; - Atmospheric chemical sensor array for remote, real-time plume tracking; - Wireless sensor platform for long-term monitoring of subsurface moisture; - Embedded piezo-resistive micro-cantilever (EPM) units for carbon tetrachloride (CCl 4 ) and hydrogen cyanide (HCN) detection; - 'iHistorian' for efficient, real-time data management of chemical releases. (authors)

  1. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  2. Image restoration by the method of convex projections: part 1 theory.

    Youla, D C; Webb, H

    1982-01-01

    A projection operator onto a closed convex set in Hilbert space is one of the few examples of a nonlinear map that can be defined in simple abstract terms. Moreover, it minimizes distance and is nonexpansive, and therefore shares two of the more important properties of ordinary linear orthogonal projections onto closed linear manifolds. In this paper, we exploit the properties of these operators to develop several iterative algorithms for image restoration from partial data which permit any number of nonlinear constraints of a certain type to be subsumed automatically. Their common conceptual basis is as follows. Every known property of an original image f is envisaged as restricting it to lie in a well-defined closed convex set. Thus, m such properties place f in the intersection E(0) = E(i) of the corresponding closed convex sets E(1),E(2),...EE(m). Given only the projection operators PE(i) onto the individual E(i)'s, i = 1 --> m, we restore f by recursive means. Clearly, in this approach, the realization of the P(i)'s in a Hilbert space setting is one of the major synthesis problems. Section I describes the geometrical significance of the three main theorems in considerable detail, and most of the underlying ideas are illustrated with the aid of simple diagrams. Section II presents rules for the numerical implementation of 11 specific projection operators which are found to occur frequently in many signal-processing applications, and the Appendix contains proofs of all the major results.

  3. Authenticity and Restoration: The Benefits of Historical Studies on Re-Examining the Implemented Restorations in Persepolis

    Mahdi Motamedmanesh

    2016-03-01

    Full Text Available Preserving the authenticity of historical monuments is an inseparable part of restoration activities that has always been asserted by the international principles of historical preservation. However, the local condition of historical sites may influence such a primitive intention of restorers. While historical documents are appropriate sources which can provide restorers with the real condition of ancient structures in the course of time, investigation through these precious materials is a time-consuming process and the reliability of these old evidences is, itself, a challenging issue. The Italian Institute for Middle and Far East (IsMEO missioned long-term restoration activities in Persepolis between 1964 and the Islamic Revolution in Iran. Generally, this institute is praised for this series of projects. In this paper, the author questions the historical authenticity of restoration activities missioned by this institute in a structure so-called The Gate of All Nations. Indeed, the restoration of this structure was influenced by the 2500th anniversary of the Persian Empire, which was held in Persepolis in 1971. By tracing the context of historical evidences and presenting a method for obtaining the authenticity of these documents, this paper demonstrates a new perspective towards the arrangement of a stone-made capital, which ornaments the uppermost part of a re-erected ancient column.

  4. Assessing the Performance of In-Stream Restoration Projects Using Radio Frequency Identification (RFID Transponders

    Bruce MacVicar

    2015-10-01

    Full Text Available Instream channel restoration is a common practice in river engineering that presents a challenge for research. One research gap is the development of monitoring techniques that allow for testable predictions of sediment transport and supply. Here we use Radio Frequency Identification (RFID transponders to compare the short-term (1-year sediment transport response to flood events in a restored and a control reach. The field site is Wilket Creek, an enlarged creek in a fully urbanized catchment without stormwater management control in Toronto, Ontario. The responses to three flooding periods, each of which are at or above the design bankfull discharge, are described. Key results are that (i particle mobility is lower in the restored reach for all three periods; (ii full mobility occurs in the control reach during the first two floods while partial mobility occurs in the restored reach; and (iii the constructed morphology exerted a controlling influence on particle entrainment, with higher mobility in the pools. Log-transformed travel distances exhibit normal distributions when grouped by particle size class, which allows a statistical comparison with power law and other predictive travel-distance relations. Results show that three bedload transport conditions can occur, with partial mobility associated with a mild relation between particle size and travel distance and full mobility associated with either a flat or steep relation depending on the degree of integration of particles in the bed. Recommendations on seeding strategy and sample sizes are made to improve the precision of the results by minimizing confidence intervals for mobility and travel distances. Even in a short term study, the RFID sediment tracking technique allows a process-based assessment of stream restoration outcomes that can be used to justify the instream intervention and plan future attempts to stabilize and enhance the system.

  5. Clinical studies in restorative dentistry: New directions and new demands.

    Opdam, N J M; Collares, K; Hickel, R; Bayne, S C; Loomans, B A; Cenci, M S; Lynch, C D; Correa, M B; Demarco, F; Schwendicke, F; Wilson, N H F

    2018-01-01

    Clinical research of restorative materials is confounded by problems of study designs, length of trials, type of information collected, and costs for trials, despite increasing numbers and considerable development of trials during the past 50 years. This opinion paper aims to discuss advantages and disadvantages of different study designs and outcomes for evaluating survival of dental restorations and to make recommendations for future study designs. Advantages and disadvantages of randomized trials, prospective and retrospective longitudinal studies, practice-based, pragmatic and cohort studies are addressed and discussed. The recommendations of the paper are that clinical trials should have rational control groups, include confounders such as patient risk factors in the data and analysis and should use outcome parameters relevant for profession and patients. Copyright © 2017 The Academy of Dental Materials. Published by Elsevier Ltd. All rights reserved.

  6. Large-scale dam removal in the northeast United States: documenting ecological responses to the Penobscot River Restoration Project

    Collins, M. J.; Aponte Clarke, G.; Baeder, C.; McCaw, D.; Royte, J.; Saunders, R.; Sheehan, T.

    2012-12-01

    The Penobscot River Restoration Project aims to improve aquatic connectivity in New England's second largest watershed ( 22,000 km2) by removing the two lowermost, mainstem dams and bypassing a third dam on a principal tributary upstream. Project objectives include: restoring unobstructed access to the entire historic riverine range for five lower river diadromous species including Atlantic and shortnose sturgeon; significantly improving access to upstream habitat for six upper river diadromous species including Atlantic salmon; reconnecting trophic linkages between headwater areas and the Gulf of Maine; restoring fluvial processes to the former impoundments; improving recreational and Penobscot Nation cultural opportunities; and maintaining basin-wide hydropower output. The project is expected to have landscape-scale benefits and the need for a significant investment in long-term monitoring and evaluation to formally quantify ecosystem response has been recognized. A diverse group of federal, state, tribal, NGO, and academic partners has developed a long-term monitoring and evaluation program composed of nine studies that began in 2009. Including American Recovery and Reinvestment Act (ARRA) funding that leveraged partner contributions, we have invested nearly $2M to date in pre- and post-removal investigations that evaluate geomorphology/bed sediment, water quality, wetlands, and fisheries. Given the number of affected diadromous species and the diversity of their life histories, we have initiated six distinct, but related, fisheries investigations to document these expected changes: Atlantic salmon upstream and downstream passage efficiency using passive integrated transponder (PIT) and acoustic telemetry; fish community structure via an index of biotic integrity (IBI); total diadromous fish biomass through hydroacoustics; shortnose sturgeon spawning and habitat use via active and passive acoustic telemetry; and freshwater-marine food web interactions by

  7. Wind River Watershed Restoration Project; Underwood Conservation District, Annual Report 2002-2003.

    White, Jim

    2004-02-01

    The goal of the Wind River project is to preserve, protect and restore Wind River steelhead. In March, 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia as 'threatened' under the Endangered Species Act. In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical. Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery and restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative. The Wind River Project includes four cooperating agencies. Those are the Underwood Conservation District (UCD), United States Geological Service (USGS), US Forest Service (USFS), and Washington State Department of Fish & Wildlife (WDFW). Tasks include monitoring steelhead populations (USGS and WDFW), Coordinating a Watershed Committee and Technical Advisory Group (UCD), evaluating physical habitat conditions (USFS and UCD), assessing watershed health (all), reducing road sediments sources (USFS), rehabilitating riparian corridors, floodplains, and channel geometry (UCD, USFS), evaluate removal of Hemlock Dam (USFS), and promote local watershed stewardship (UCD, USFS). UCD's major efforts have included coordination of the Wind River Watershed Committee and Technical Advisory Committee (TAC), water temperature and water chemistry monitoring, riparian habitat improvement projects, and educational activities. Our coordination work enables the local Watershed Committee and TAC to function and provide essential input to Agencies, and our habitat improvement work focuses on riparian revegetation. Water chemistry and temperature data collection provide information for monitoring watershed conditions and fish habitat, and are comparable with data gathered in previous years. Water chemistry information collected on Trout Creek should, with 2 years data, determine whether pH levels make conditions

  8. Settling characteristics of fine-grained sediments used in Louisiana coastal land building and restoration projects

    Ghose Hajra, M.

    2016-02-01

    Coastal property development, sea level rise, geologic subsidence, loss of barrier islands, increasing number and intensity of coastal storms and other factors have resulted in water quality degradation, wetlands loss, reduced storm and surge protection, ground settlement, and other challenges in coastal areas throughout the world. One of the goals towards reestablishing a healthy coastal ecosystem is to rebuild wetlands with river diversion or sediment conveyance projects that optimally manage and allocate sediments, minimally impact native flora and fauna, and positively affect the water quality. Engineering properties and material characteristics of the dredged material and foundation soils are input parameters in several mathematical models used to predict the long term behavior of the dredged material and foundation soil. Therefore, proper characterization of the dredged material and foundation soils is of utmost importance in the correct design of a coastal restoration and land reclamation project. The sedimentation and consolidation characteristics of the dredged material as well as their effects on the time rate of settlement of the suspended solid particles and underlying foundation soil depend, among other factors, on the (a) grain size distribution of the dredged material, (b) salinity (fresh, brackish, or saltwater environment) of the composite slurry, and (c) concentration of the solid particles in the slurry. This paper will present the results from column settling tests and self-weight consolidation tests performed on dredged samples obtained from actual restoration projects in Louisiana. The effects of salinity, grain size distribution, and initial particle concentration on the sedimentation and consolidation parameters of the dredged material will also be discussed.

  9. Great Basin paleoenvironmental studies project

    1993-01-01

    Project goals, project tasks, progress on tasks, and problems encountered are described and discussed for each of the studies that make up the Great Basin Paleoenvironmental Studies Project for Yucca Mountain. These studies are: Paleobotany, Paleofauna, Geomorphology, and Transportation. Budget summaries are also given for each of the studies and for the overall project

  10. An Ecosystem-Based Approach to Habitat Restoration Projects with Emphasis on Salmonids in the Columbia River Estuary, 2003 Technical Report.

    Johnson, G.; Thom, R.; Whiting, A. (Pacific Northwest National Laboratory)

    2003-11-01

    actions in the CRE are under continual evaluation and revision at both the project and program levels. Lessons learned from current and proposed habitat restoration projects need to be applied to all future work, such as the Estuary Partnership's habitat restoration program and the U.S. Army Corps of Engineers General Investigation Study for the CRE, to ensure the most effective use of resources and the best possible long term environment for salmonid growth and survival in the CRE.

  11. Summary of operations and performance of the Murdock site restoration project in 2007.

    LaFreniere, L. M.; Environmental Science Division

    2008-06-03

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief

  12. Phase I of the Kissimmee River restoration project, Florida, USA: impacts of construction on water quality.

    Colangelo, David J; Jones, Bradley L

    2005-03-01

    Phase I of the Kissimmee River restoration project included backfilling of 12 km of canal and restoring flow through 24 km of continuous river channel. We quantified the effects of construction activities on four water quality parameters (turbidity, total phosphorus flow-weighted concentration, total phosphorus load and dissolved oxygen concentration). Data were collected at stations upstream and downstream of the construction and at four stations within the construction zone to determine if canal backfilling and construction of 2.4 km of new river channel would negatively impact local and downstream water quality. Turbidity levels at the downstream station were elevated for approximately 2 weeks during the one and a half year construction period, but never exceeded the Florida Department of Environmental Protection construction permit criteria. Turbidity levels at stations within the construction zone were high at certain times. Flow-weighted concentration of total phosphorus at the downstream station was slightly higher than the upstream station during construction, but low discharge limited downstream transport of phosphorus. Total phosphorus loads at the upstream and downstream stations were similar and loading to Lake Okeechobee was not significantly affected by construction. Mean water column dissolved oxygen concentrations at all sampling stations were similar during construction.

  13. Technical Approach and Plan for Transitioning Spent Nuclear Fuel (SNF) Project Facilities to the Environmental Restoration Program

    SKELLY, W.A.

    1999-01-01

    This document describes the approach and process in which the 100-K Area Facilities are to be deactivated and transitioned over to the Environmental Restoration Program after spent nuclear fuel has been removed from the K Basins. It describes the Transition Project's scope and objectives, work breakdown structure, activity planning, estimated cost, and schedule. This report will be utilized as a planning document for project management and control and to communicate details of project content and integration

  14. Strategic alliance for environmental restoration - results of the Chicago Pile 5 large scale demonstration project

    Aker, R.E.; Bradley, T.L.; Bhattacharyya, S.

    1998-01-01

    The world's largest environmental cleanup effort is focused upon the DOE weapons complex. These cleanup efforts parallel those which will be required as the commercial nuclear industry reaches the end of licensed life. The strategic Alliance for Environmental Restoration (Strategic Alliance), reflects the cooperative interest of industry, commercial nuclear utilities, university and national laboratory team members to bring a collaborative best-in-class approach to finding, and providing effective delivery of innovative environmental remediation technologies to the DOE Complex and subsequently to industry. The Strategic Alliance is comprised of team members from ComEd, Duke Engineering and Services, 3M, ICF Kaiser, Florida International University, and Argonne National Laboratory in concert with DOE. This team tested and evaluated over twenty innovative technologies in an effort to help provide cost effective technology solutions to DOE/Industry needs for decontamination and decommissioning. This paper summarizes the approach used by the Strategic Alliance and describes the results of this DOE funded project

  15. Germination characteristics of Rhinanthus minor influence field emergence, competitiveness and potential use in restoration projects.

    Marin, M; Laverack, G; Matthews, S; Powell, A A

    2018-02-10

    The facultative root hemi-parasite Rhinanthus minor is often used in grassland habitat restoration projects to regulate ecosystem structure and function. Its impact on community productivity and diversity as a function of resource supply, sward composition and management has been widely investigated. However, there is a lack of information about the possible influence of seed quality on the efficacy of the hemi-parasite. Ten seed lots from commercial sources were sown in the field and their germination characteristics were investigated in the laboratory. Seeds from four lots were also germinated and sown in pots alongside plants of two host species, Lotus corniculatus and Holcus lanatus. Plant establishment, height and flowering density were evaluated for the hemi-parasite, while plant biomass was measured for both R. minor and its host. Two aspects of seed quality influenced the field emergence of seed lots of R. minor, the radicle emergence (%) and the length of the lag period from the beginning of imbibition to germination (mean germination time), which indicates seed vigour. A longer lag period (lower vigour) was associated with higher levels of seedling mortality and lower plant vigour, in terms of plant height and biomass accumulation and was also reflected in the parasitic impact of the seed lots. Seed quality, specifically germination and vigour, can influence the establishment, survival, subsequent plant productivity and parasitic impact of R. minor in vegetation restoration projects. Seed quality is discussed as a key factor to consider when predicting the impact of the hemi-parasite on community productivity and diversity. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  16. How public issues shape environmental restoration plans - experiences with Colorado UMTRA projects

    Hunt, B.; Monaghan, J.

    1991-01-01

    Federal environmental restoration plans are being significantly impacted by open-quotes grassrootsclose quotes public pressure and by community demands, some of which have little relation to the technical standards of remediation and which go well beyond authorizing legislation. These demands often represent significant additional project costs. A review of Uranium Mill Tailings Remedial Action (UMTRA) Program experiences in Colorado suggests that the more serious open-quotes grassrootsclose quotes issues associated with remediation rarely diminish and, in fact, will intensify over time. This presents program administrators with the dilemma of attempting to adhere to program mandates and keep projects within budget, while at the same time trying to be responsive to community concerns. Such high-profiled community debates have the ability to delay remediation and even jeopardize important projects. After prolonged public debate, when it becomes clear an issue will not dissipate, project officials may be forced to meet certain community demands. Often, this results in not only increased costs, but a loss of public confidence in clean-up efforts. Evidence also suggests, however, that when critical public issues can be identified and addressed before they become overly contentious, significant problems and controversy can be avoided; but, the situation is made difficult because project officials often lack the policy guidance to determine which, if any, community demands should be addressed and to what extent they should be met. The adoption of several key public policy principles by program administrators will provide a greater ability to address community demands in a timely and successful manner

  17. Project chariot remediation - the use of DOE's observational approach for environmental restoration with elements of the new DOE safer approach

    Hopkins, A.; Stewart, C.; Cabble, K.

    1994-01-01

    The primary purpose of Project Chariot was to investigate the technical problems and assess the effect of the proposed harbor excavation using nuclear explosives in Alaska. However, no nuclear devices were brought to the Project Chariot site. Between 1959 and 1961 various environmental tests were conducted. During the course of these environmental studies, the U.S. Geological Survey (USGS) granted the use of up to 5 curies of radioactive material at the Chariot site in Cape Thompson, Alaska; however only 26 millicuries were ever actually used. The tests were conducted in 12 test plots which were later gathered together and were mixed with in situ-soils generating approximately 1,600 cubic feet of soil. This area was then covered with four feet of clean soil, creating a mound. In 1962, the site was abandoned. A researcher at the University of Alaska at Fairbanks obtained in formation regarding the tests conducted and the materials left at the Project Chariot site. In response to concerns raised through the publication of this information, it was decided by the Department of Energy (DOE) that total remediation of the mound be completed within the year. During the summer of 1993, IT Corporation carried out the assessment and remediation of the Project Chariot site using a streamlined approach to waste site decision making called the Observational Approach (OA), and added elements of the new DOE Streamlined Approach for Environmental Restoration (SAFER). This remediation and remediation approach is described

  18. RIGED-RA project - Restoration and management of Coastal Dunes in the Northern Adriatic Coast, Ravenna Area - Italy

    Giambastiani, Beatrice M. S.; Greggio, Nicolas; Sistilli, Flavia; Fabbri, Stefano; Scarelli, Frederico; Candiago, Sebastian; Anfossi, Giulia; Lipparini, Carlo A.; Cantelli, Luigi; Antonellini, Marco; Gabbianelli, Giovanni

    2016-10-01

    Coastal dunes play an important role in protecting the coastline. Unfortunately, in the last decades dunes have been removed or damaged by human activities. In the Emilia- Romagna region significant residual dune systems are found only along Ravenna and Ferrara coasts. In this context, the RIGED-RA projectRestoration and management of coastal dunes along the Ravenna coast” (2013-2016) has been launched with the aims to identify dynamics, erosion and vulnerability of Northern Adriatic coast and associated residual dunes, and to define intervention strategies for dune protection and restoration. The methodology is based on a multidisciplinary approach that integrates the expertise of several researchers and investigates all aspects (biotic and abiotic), which drive the dune-beach system. All datasets were integrated to identify test sites for applying dune restoration. The intervention finished in April 2016; evolution and restoration efficiency will be assessed.

  19. Project studies and engaged scholarship

    Geraldi, Joana; Söderlund, Jonas

    2016-01-01

    and to rejuvenate these research directions. Design/methodology/approach The authors propose the umbrella term: “project studies” to denote the research related to projects and temporary organizing. Project studies is conceived not only as a body of research, but also as a social process embedded in research...... scholars, who’s “job” goes beyond the writing of articles and research applications, and includes shaping discourses of project research, nurturing new project scholars, contributing to project practice and carefully considering the legacy of projects and project studies in society. Originality......Purpose In 2006, the “Rethinking Project Management” network called for a paradigm shift in project research, and proposed five research directions. The directions inspired research and marked a milestone in the development of the field. The purpose of this paper is to reflect on the past decade...

  20. Macroinvertebrate communities evaluated prior to and following a channel restoration project in Silver Creek, Blaine County, Idaho, 2001-16

    MacCoy, Dorene E.; Short, Terry M.

    2017-11-22

    The U.S. Geological Survey, in cooperation with Blaine County and The Nature Conservancy, evaluated the status of macroinvertebrate communities prior to and following a channel restoration project in Silver Creek, Blaine County, Idaho. The objective of the evaluation was to determine whether 2014 remediation efforts to restore natural channel conditions in an impounded area of Silver Creek caused declines in local macroinvertebrate communities. Starting in 2001 and ending in 2016, macroinvertebrates were sampled every 3 years at two long-term trend sites and sampled seasonally (spring, summer, and autumn) in 2013, 2015, and 2016 at seven synoptic sites. Trend-site communities were collected from natural stream-bottom substrates to represent locally established macroinvertebrate assemblages. Synoptic site communities were sampled using artificial (multi-plate) substrates to represent recently colonized (4–6 weeks) assemblages. Statistical summaries of spatial and temporal patterns in macroinvertebrate taxonomic composition at both trend and synoptic sites were completed.The potential effect of the restoration project on resident macroinvertebrate populations was determined by comparing the following community assemblage metrics:Total taxonomic richness (taxa richness);Total macroinvertebrate abundance (total abundance);Ephemeroptera, Plecoptera, Trichoptera (EPT) richness;EPT abundance;Simpson’s diversity; andSimpson’s evenness for periods prior to and following restoration.A significant decrease in one or more metric values in the period following stream channel restoration was the basis for determining impairment to the macroinvertebrate communities in Silver Creek.Comparison of pre-restoration (2001–13) and post‑restoration (2016) macroinvertebrate community composition at trend sites determined that no significant decreases occurred in any metric parameter for communities sampled in 2016. Taxa and EPT richness of colonized assemblages at synoptic sites

  1. 78 FR 1246 - Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the...

    2013-01-08

    ...-FF08RSDC00] Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the... scoping with regard to the environmental impact statement (EIS) for the proposed Otay River Estuary... one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  2. Gridded Surface Subsurface Hydrologic Analysis Modeling for Analysis of Flood Design Features at the Picayune Strand Restoration Project

    2016-08-01

    restore its predrainage hydrology and ecological function for beneficial effects on flora and fauna in the project area and surrounding public lands. The...partnership with South Florida Water Management District (SFWMD), is constructing these features. Engineering support is required for hydrologic and...simulation accuracy and related resource requirements. Spatial data products such as digital elevation models, surveyed channel cross sections, soil

  3. UF's Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP)

    Aufmuth, Joe

    2018-01-01

    Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.

  4. Conservation and restoration of indigenous plants to improve community livelihoods: the Useful Plants Project

    Ulian, Tiziana; Sacandé, Moctar; Mattana, Efisio

    2014-05-01

    Kew's Millennium Seed Bank partnership (MSBP) is one of the largest ex situ plant conservation initiatives, which is focused on saving plants in and from regions most at risk, particularly in drylands. Seeds are collected and stored in seed banks in the country of origin and duplicated in the Millennium Seed Bank in the UK. The MSBP also strengthens the capacity of local communities to successfully conserve and sustainably use indigenous plants, which are important for their wellbeing. Since 2007, high quality seed collections and research information have been gathered on ca. 700 useful indigenous plant species that were selected by communities in Botswana, Kenya, Mali, Mexico and South Africa through Project MGU - The Useful Plants Project. These communities range from various farmer's groups and organisations to traditional healers, organic cotton/crop producers and primary schools. The information on seed conservation and plant propagation was used to train communities and to propagate ca. 200 species that were then planted in local gardens, and as species reintroduced for reforestation programmes and enriching village forests. Experimental plots have also been established to further investigate the field performance (plant survival and growth rate) of indigenous species, using low cost procedures. In addition, the activities support revenue generation for local communities directly through the sustainable use of plant products or indirectly through wider environmental and cultural services. This project has confirmed the potential of biodiversity conservation to improve food security and human health, enhance community livelihoods and strengthen the resilience of land and people to the changing climate. This approach of using indigenous species and having local communities play a central role from the selection of species to their planting and establishment, supported by complementary research, may represent a model for other regions of the world, where

  5. In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

    Juhlin, R.; Butherus, M.

    2006-01-01

    The U.S. Department of Energy (DOE) is conducting thermal remediation to remove non-aqueous phase liquids (NAPLs) from the subsurface at the Northeast Site that is part of the Pinellas Environmental Restoration Project. The Northeast Site is located on the Young - Rainey Science, Technology, and Research (STAR) Center in Largo, Florida. The STAR Center was formerly a DOE facility. The NAPL remediation was performed at Area A and is currently being performed at Area B at the Northeast Site. The remediation at Area A was completed in 2003 and covered an area of 900 m 2 (10,000 ft 2 ) and a depth of remediation that extended to 10.7 m (35 ft) below ground surface. Cleanup levels achieved were at or below maximum contaminant levels in almost all locations. The remediation project at Area B is ongoing and covers an area of 3,240 m 2 (36,000 ft 2 ), a volume of 41,300 m (54,000 yd 3), and a depth of remediation to 12 m (40 ft) below ground surface. In addition, a portion of the subsurface under an occupied building in Area B is included in the remediation. The cleanup levels achieved from this remediation will be available in the Area B Final Report that will be posted on the DOE Office of Legacy Management web site (www.lm.doe.gov/land/sites/fl/ pinellas/pinellas.htm) in January 2007. Electrical resistive heating and steam were the chosen remediation methods at both areas. Lessons learned from the Area A remediation were incorporated into the Area B remediation and could benefit managers of similar remediation projects. (authors)

  6. Restoring effective sleep tranquility (REST): A feasibility and pilot study.

    Eakman, Aaron M; Schmid, Arlene A; Henry, Kimberly L; Rolle, Natalie R; Schelly, Catherine; Pott, Christine E; Burns, Joshua E

    2017-06-01

    The purpose of this pilot study was to establish the feasibility of completing a future controlled trial of a multi-component cognitive behavioral therapy for insomnia program for military veterans with sleep disturbance. This was a single-arm feasibility and pilot study. Participants were United States post-9/11 veterans with service-connected injuries, university students, and had self-reported sleep disturbances. Restoring Effective Sleep Tranquility was a multi-component cognitive behavioral therapy for insomnia intervention consisting of seven sessions of group therapy and eight 1:1 sessions delivered by occupational therapists. Feasibility and pilot indicators were process, resources, management, and scientific, including pre-post-assessments of sleep difficulties, dysfunctional sleep beliefs, participation, and pain interference. Indicators were supportive of feasibility, including reduced sleep difficulties (for example Medical Outcomes Study Sleep Measure [ t  = 3.29, p  = .02]), reduced nightmares: t  = 2.79, p  = .03; fewer dysfunctional sleep beliefs: t  = 3.63, p  = .01, and greater ability to participate in social roles: t  = -2.86, p  = .03, along with trends towards improved satisfaction with participation and reduced pain interference. The Restoring Effective Sleep Tranquility program may reduce sleep difficulties and improve participation in US veterans with service-connected injuries, and evidence indicates a controlled trial would be feasible to deliver.

  7. Environmental Restoration Program pollution prevention checklist guide for the facility characterization project phase

    1993-09-01

    A facility characterization (FC) is conducted to determine the nature and extent contamination at a potential hazardous facility waste site. The information gathered during an FC includes (1) data on the volume and chemical nature of the waste, (2) information on the extent of contamination and the migration potential of the contaminants, (3) preliminary information on evaluation of alternative concepts that can or cannot be considered, and (4)supportive technical and cost data. For the purposes of identification, the following operational phases will be used for definition for this phase of the decommissioning and decontamination process (1) facility characterization before clean up, (2) characterization during clean up, (3) characterization of waste materials, and (4) site characterization after clean up. A key consideration in this process is the prevention of any waste to be generated from these characterization activities. The purpose of this checklist guide is to assist users with incorporating pollution prevention/waste minimization (PP/WM) in all FC phase projects of the Environmental Restoration (ER) Program. This guide will help users document PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction

  8. Environmental Restoration Program pollution prevention checklist guide for the surveillance and maintenance project phase

    1993-09-01

    DOE Order 5820.2 mandates that a surveillance and maintenance program be established in all shut-down facilities to ensure adequate containment of contamination, provide physical safety and security, and reduce potential public and environmental hazards. A key consideration in this process is the prevention of any waste to be generated from these activities. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Surveillance and Maintenance (S ampersand M) phase projects of the Environmental Restoration (ER) Program. This guide will help users document their PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  9. Analysis of explosion-induced releases of toxic materials at an environmental restoration project

    Bloom, S.G.; Moon, W.H. Jr.

    1993-01-01

    Prior to 1988, a variety of materials were buried on the US DOE Oak Ridge Reservation. Records of the disposal operations are incomplete and toxic materials may have been placed adjacent to potential explosives. One of the safety concerns in conducting an environmental restoration project at the burial sites, is the possibility of an explosion which could release toxic materials to the atmosphere. A safety analysis examined the consequences of such releases by first postulating an upper bound for the strength of an explosive. A correlation, developed by Steindler and Seefeldt of Argonne National Laboratory, was then used to estimate the amount and particle-size distribution of the material that could become airborne from the explosion. The estimated amount of airborne material was the source term in an atmospheric dispersion model which was used to calculate infinite-time, concentration-time integrals and 5-minute, time- weighted average concentrations at locations down-wind from the explosion. The dispersion model includes particle deposition as a function of particle-size distribution class. The concentration-time integrals and average concentrations were compared to published guidelines to assess the consequences of an accidental explosion

  10. Trends and habitat associations of waterbirds using the South Bay Salt Pond Restoration Project, San Francisco Bay, California

    De La Cruz, Susan E. W.; Smith, Lacy M.; Moskal, Stacy M.; Strong, Cheryl; Krause, John; Wang, Yiwei; Takekawa, John Y.

    2018-04-02

    Executive SummaryThe aim of the South Bay Salt Pond Restoration Project (hereinafter “Project”) is to restore 50–90 percent of former salt evaporation ponds to tidal marsh in San Francisco Bay (SFB). However, hundreds of thousands of waterbirds use these ponds over winter and during fall and spring migration. To ensure that existing waterbird populations are supported while tidal marsh is restored in the Project area, managers plan to enhance the habitat suitability of ponds by adding islands and berms to change pond topography, manipulating water salinity and depth, and selecting appropriate ponds to maintain for birds. To help inform these actions, we used 13 years of monthly (October–April) bird abundance data from Project ponds to (1) assess trends in waterbird abundance since the inception of the Project, and (2) evaluate which pond habitat characteristics were associated with highest abundances of different avian guilds and species. For comparison, we also evaluated waterbird abundance trends in active salt production ponds using 10 years of monthly survey data.We assessed bird guild and species abundance trends through time, and created separate trend curves for Project and salt production ponds using data from every pond that was counted in a year. We divided abundance data into three seasons—fall (October–November), winter (December–February), and spring (March–April). We used the resulting curves to assess which periods had the highest bird abundance and to identify increasing or decreasing trends for each guild and species.

  11. A project optimization for small watercourses restoration in the northern part of the Volga-Akhtuba floodplain by the geoinformation and hydrodynamic modeling

    Voronin, Alexander; Vasilchenko, Ann; Khoperskov, Alexander

    2018-03-01

    The project of small watercourses restoration in the northern part of the Volga-Akhtuba floodplain is considered together with the aim of increasing the watering of the territory during small and medium floods. The topography irregularity, the complex structure of the floodplain valley consisting of large number of small watercourses, the presence of urbanized and agricultural areas require careful preliminary analysis of the hydrological safety and efficiency of geographically distributed project activities. Using the digital terrain and watercourses structure models of the floodplain, the hydrodynamic flood model, the analysis of the hydrological safety and efficiency of several project implementation strategies has been conducted. The objective function values have been obtained from the hydrodynamic calculations of the floodplain territory flooding for virtual digital terrain models simulating alternatives for the geographically distributed project activities. The comparative efficiency of several empirical strategies for the geographically distributed project activities, as well as a two-stage exact solution method for the optimization problem has been studied.

  12. Screening for Phytophthora cinnamomi in reclaimed mined lands targeted for American chestnut restoration projects

    Shiv Hiremath; Kirsten Lehtoma; Annemarie Nagle; Pierluigi. Bonello

    2011-01-01

    We are working toward restoring the American chestnut in southeastern Ohio, which was once part of the tree's natural range. Some of these lands have been severely affected by excessive mining operations for several decades. Therefore, we are planning and testing use of ectomycorrhizal fungi in the restoration efforts. Mycorrhizal fungi may play a vital role in...

  13. 75 FR 52360 - Upper Truckee River Restoration and Golf Course Reconfiguration Project, El Dorado County, CA

    2010-08-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Upper Truckee River Restoration and Golf Course... and comment the draft EIR/EIS for the Upper Truckee River Restoration and Golf Course Reconfiguration... include continuing existing golf course use, removal of the entire Lake Tahoe Golf Course, or...

  14. A review of theoretical frameworks applicable for designing agricultural watershed restoration projects

    Agricultural watershed restoration is the process of assisting the recovery of ecosystem structure and/or function within watersheds that have been degraded and damaged by agriculture. Unfortunately, agricultural watershed restoration is the rare exception within the Midwestern United States despit...

  15. Biological restoration of major transportation facilities domestic demonstration and application project (DDAP): technology development at Sandia National Laboratories.

    Ramsey, James L., Jr. (.,; .); Melton, Brad; Finley, Patrick; Brockman, John; Peyton, Chad E.; Tucker, Mark David; Einfeld, Wayne; Griffith, Richard O.; Brown, Gary Stephen; Lucero, Daniel A.; Betty, Rita G.; McKenna, Sean Andrew; Knowlton, Robert G.; Ho, Pauline

    2006-06-01

    The Bio-Restoration of Major Transportation Facilities Domestic Demonstration and Application Program (DDAP) is a designed to accelerate the restoration of transportation nodes following an attack with a biological warfare agent. This report documents the technology development work done at SNL for this DDAP, which include development of the BROOM tool, an investigation of surface sample collection efficiency, and a flow cytometry study of chlorine dioxide effects on Bacillus anthracis spore viability.

  16. Characterizing Process-Based River and Floodplain Restoration Projects on Federal Lands in Oregon, and Assessing Catalysts and Barriers to Implementation

    Bianco, S.; Jones, J. A.; Gosnell, H.

    2017-12-01

    Process-based restoration, a new approach to river and floodplain management, is being implemented on federal lands across Oregon. These management efforts are aimed at promoting key physical processes in order to improve river ecological function, create diverse habitat, and increase biological productivity for ESA-listed bull trout and spring Chinook salmon. Although the practice is being disseminated across the Pacific Northwest, it remains unclear what is driving aquatic and riparian ecosystem restoration towards this process-based approach and away from form-based methods such as Rosgen's Natural Channel Design. The technical aspects of process-based restoration have been described in the literature (ex. Beechie et al. 2010), but little is known about the practice from a social science perspective, and few case studies exist to assess the impact of these efforts. We combine semi-structured qualitative interviews with management experts and photogrammetric analysis to better understand how complex social processes and changing ideas about aquatic ecosystems are manifesting on the ground in federal land management. This study characterizes process-based river and floodplain restoration projects on federal lands in Oregon, and identifies catalysts and barriers to its implementation. The Deer Creek Floodplain Enhancement project serves as a case study for photogrammetric analysis. To characterize long-term changes at Deer Creek, geomorphic features were mapped and classified using orthoimage mosaics developed from a time series of historic aerial photographs dating back to 1954. 3D Digital Elevation Models (3D-DEMs) were created of portions of the modified sections of Deer Creek and its floodplain immediately before and after restoration using drone-captured aerial photography and a photogrammetric technique called Structure from Motion. These 3D-DEMs have enabled extraction of first-order geomorphic variables to compare pre- and post-project conditions. This

  17. Laboratory studies on natural restoration of ground water after in-situ leach uranium mining

    Bell, N.E.; Deutsch, W.J.; Serne, R.J.

    1983-05-01

    When uranium is mined using in-situ leach techniques, the chemical quality of the ground water in the ore-zone aquifer is affected. This could lead to long-term degradation of the ground water if restoration techniques are not applied after the leaching is completed. Pacific Northwest Laboratory (PNL), is conducting an NRC-sponsored research project on natural restoration and induced-restoration techniques. Laboratory studies were designed to evaluate the ability of the natural system (ore-zone sediments and groundwater) to mitigate the effects of mining on aquifer chemistry. Using batch and flow-through column experiments [performed with lixiviant (leaching solution) and sediments from the reduced zone of an ore-zone aquifer], we found that the natural system can lower uranium and bicarbonate concentrations in solutions and reduce the lixiviant redox potential (Eh). The change in redox potential could cause some of the contaminants that were dissolved during the uranium leaching operation to precipitate, thereby lowering their solution concentration. The concentrations of other species such as calcium, potassium, and sulfate increased, possibly as a result of mineral dissolution and ion exchange. In this paper, we describe the experimentally determined mobility of contaminants after in-situ leach mining, and discuss the possible chemical process affecting mobility

  18. Laboratory studies on natural restoration of ground water after in-situ leach uranium mining

    Bell, N.E.; Deutsch, W.J.; Serne, R.J.

    1983-05-01

    When uranium is mined using in-situ leach techniques, the chemical quality of the ground water in the ore-zone aquifer is affected. This could lead to long-term degradation of the ground water if restoration techniques are not applied after the leaching is completed. Pacific Northwest Laboratory (PNL), is conducting an NRC-sponsored research project on natural restoration and induced-restoration techniques. Laboratory studies were designed to evaluate the ability of the natural system (ore-zone sediments and groundwater) to mitigate the effects of mining on aquifer chemistry. Using batch and flow-through column experiments (performed with lixiviant (leaching solution) and sediments from the reduced zone of an ore-zone aquifer), we found that the natural system can lower uranium and bicarbonate concentrations in solutions and reduce the lixiviant redox potential (Eh). The change in redox potential could cause some of the contaminants that were dissolved during the uranium leaching operation to precipitate, thereby lowering their solution concentration. The concentrations of other species such as calcium, potassium, and sulfate increased, possibly as a result of mineral dissolution and ion exchange. In this paper, we describe the experimentally determined mobility of contaminants after in-situ leach mining, and discuss the possible chemical process affecting mobility.

  19. Shared visions, future challenges: a case study of three Collaborative Forest Landscape Restoration Program locations

    Emily H. Walpole

    2017-06-01

    Full Text Available The USDA Forest Service is encouraging the restoration of select forest ecosystems through its Collaborative Forest Landscape Restoration Program (CFLRP. Collaboration is often necessary to implement landscape-scale management projects such as these, and a substantial body of research has examined the benefits and limitations of using collaboration as a tool for improving relationships, trust, and other outcomes among stakeholder groups. However, limited research has investigated the use of collaboration to achieve large-scale ecological restoration goals. Restoration poses some unique conditions for a collaborative approach, including reaching agreement on which historic conditions to use as a reference point, the degree of departure from these reference conditions that warrants management intervention, and how to balance historic conditions with expected future conditions and current human uses of the landscape. Using a mental-models approach, semistructured interviews were conducted with a total of 25 participants at three CFLRP sites. Results indicate that collaboration contributed to improved relationships and trust among participants, even among stakeholder groups with a history of disagreement over management goals. In addition, a shared focus on improving ecosystem resilience helped groups to address controversial management topics such as forest thinning in some areas. However, there was also evidence that CFLRP partnerships in our study locations have primarily focused on areas of high agreement among their stakeholders to date, and have not yet addressed other contentious topics. Previous studies suggest that first conducting management in areas with high consensus among participating stakeholders can build relationships and advance long-term goals. Nonetheless, our results indicate that achieving compromise in less obviously departed systems will require more explicit value-based discussions among stakeholders.

  20. Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska

    Kautsky, Mark [U.S. Department of Energy, Office of Legacy Management; Hutton, Rick [Navarro Research & Engineering; Miller, Judy [Navarro Research & Engineering

    2016-03-06

    The Chariot site is located in the Ogotoruk Valley in the Cape Thompson region of northwest Alaska. Project Chariot was part of the Plowshare Program, created in 1957 by the US Atomic Energy Commission (AEC), a predecessor agency of the US Department of Energy (DOE), to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. AEC, with assistance from other agencies, conducted more than 40 pretest bioenvironmental studies of the Cape Thompson area between 1959 and 1962; however, the Plowshare Program work at the Project Chariot site (Figure 1) was cancelled because of strong public opposition [1]. No nuclear explosions were ever conducted at the site.

  1. Restoring Eelgrass (Zostera marina) from Seed: A Comparison of Planting Methods for Large-Scale Projects

    Orth, Robert; Marion, Scott; Granger, Steven; Traber, Michael

    2008-01-01

    Eelgrass (Zostera marina) seeds are being used in a variety of both small- and large-scale restoration activities and have been successfully used to initiate recovery of eelgrass in the Virginia seaside coastal lagoons...

  2. NOAA's Coastal Protection and Restoration Division: Watershed Database and Mapping Projects

    National Oceanic and Atmospheric Administration, Department of Commerce — Protection and restoration of coastal watersheds requires the synthesis of complex environmental issues. Contaminated site remediation, dredging and disposal of...

  3. Hydrological information products for the Off-Project Water Program of the Klamath Basin Restoration Agreement

    Snyder, Daniel T.; Risley, John C.; Haynes, Jonathan V.

    2012-01-01

    The Klamath Basin Restoration Agreement (KBRA) was developed by a diverse group of stakeholders, Federal and State resource management agencies, Tribal representatives, and interest groups to provide a comprehensive solution to ecological and water-supply issues in the Klamath Basin. The Off-Project Water Program (OPWP), one component of the KBRA, has as one of its purposes to permanently provide an additional 30,000 acre-feet of water per year on an average annual basis to Upper Klamath Lake through "voluntary retirement of water rights or water uses or other means as agreed to by the Klamath Tribes, to improve fisheries habitat and also provide for stability of irrigation water deliveries." The geographic area where the water rights could be retired encompasses approximately 1,900 square miles. The OPWP area is defined as including the Sprague River drainage, the Sycan River drainage downstream of Sycan Marsh, the Wood River drainage, and the Williamson River drainage from Kirk Reef at the southern end of Klamath Marsh downstream to the confluence with the Sprague River. Extensive, broad, flat, poorly drained uplands, valleys, and wetlands characterize much of the study area. Irrigation is almost entirely used for pasture. To assist parties involved with decisionmaking and implementation of the OPWP, the U.S. Geological Survey (USGS), in cooperation with the Klamath Tribes and other stakeholders, created five hydrological information products. These products include GIS digital maps and datasets containing spatial information on evapotranspiration, subirrigation indicators, water rights, subbasin streamflow statistics, and return-flow indicators. The evapotranspiration (ET) datasets were created under contract for this study by Evapotranspiration, Plus, LLC, of Twin Falls, Idaho. A high-resolution remote sensing technique known as Mapping Evapotranspiration at High Resolution and Internalized Calibration (METRIC) was used to create estimates of the spatial

  4. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    NONE

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals.

  5. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals

  6. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers.

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m(3)/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  7. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m3/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  8. The STRATEGY project: decision tools to aid sustainable restoration and long-term management of contaminated agricultural ecosystems.

    Howard, B J; Beresford, N A; Nisbet, A; Cox, G; Oughton, D H; Hunt, J; Alvarez, B; Andersson, K G; Liland, A; Voigt, G

    2005-01-01

    The STRATEGY project (Sustainable Restoration and Long-Term Management of Contaminated Rural, Urban and Industrial Ecosystems) aimed to provide a holistic decision framework for the selection of optimal restoration strategies for the long-term sustainable management of contaminated areas in Western Europe. A critical evaluation was carried out of countermeasures and waste disposal options, from which compendia of state-of-the-art restoration methods were compiled. A decision support system capable of optimising spatially varying restoration strategies, that considered the level of averted dose, costs (including those of waste disposal) and environmental side effects was developed. Appropriate methods of estimating indirect costs associated with side effects and of communicating with stakeholders were identified. The importance of stakeholder consultation at a local level and of ensuring that any response is site and scenario specific were emphasised. A value matrix approach was suggested as a method of addressing social and ethical issues within the decision-making process, and was designed to be compatible with both the countermeasure compendia and the decision support system. The applicability and usefulness of STRATEGY outputs for food production systems in the medium to long term is assessed.

  9. The STRATEGY project: decision tools to aid sustainable restoration and long-term management of contaminated agricultural ecosystems

    Howard, B.J.; Beresford, N.A.; Nisbet, A.; Cox, G.; Oughton, D.H.; Hunt, J.; Alvarez, B.; Andersson, K.G.; Liland, A.; Voigt, G.

    2005-01-01

    The STRATEGY project (Sustainable Restoration and Long-Term Management of Contaminated Rural, Urban and Industrial Ecosystems) aimed to provide a holistic decision framework for the selection of optimal restoration strategies for the long-term sustainable management of contaminated areas in Western Europe. A critical evaluation was carried out of countermeasures and waste disposal options, from which compendia of state-of-the-art restoration methods were compiled. A decision support system capable of optimising spatially varying restoration strategies, that considered the level of averted dose, costs (including those of waste disposal) and environmental side effects was developed. Appropriate methods of estimating indirect costs associated with side effects and of communicating with stakeholders were identified. The importance of stakeholder consultation at a local level and of ensuring that any response is site and scenario specific were emphasised. A value matrix approach was suggested as a method of addressing social and ethical issues within the decision-making process, and was designed to be compatible with both the countermeasure compendia and the decision support system. The applicability and usefulness of STRATEGY outputs for food production systems in the medium to long term is assessed

  10. INTEGRATED SURVEY FOR ARCHITECTURAL RESTORATION: A METHODOLOGICAL COMPARISON OF TWO CASE STUDIES

    G. Bianchi

    2016-06-01

    Full Text Available A preliminary survey campaign is essential in projects of restoration, urban renewal, rebuilding or promotion of architectural heritage. Today several survey techniques allow full 3D object restitution and modelling that provides a richer description than simple 2D representations. However, the amount of data to collect increases dramatically and a trade-off between efficiency and productivity from one side and assuring accuracy and completeness of the results on the other must be found. Depending on the extent and the complexity of the task, a single technique or a combination of several ones might be employed. Especially when documentation at different scales and with different levels of detail are foreseen, the latter will likely be necessary. The paper describes two architectural surveys in Italy: the old village of Navelli (AQ, affected by the earthquake in 2009, and the two most relevant remains in Codiponte (MS, damaged by the earthquake in 2013, both in the context of a project of restoration and conservation. In both sites, a 3D survey was necessary to represent effectively the objects. An integrated survey campaign was performed in both cases, which consists of a GPS network as support for georeferencing, an aerial survey and a field survey made by laser scanner and close range photogrammetry. The two case studies, thanks to their peculiarities, can be taken as exemplar to wonder if the integration of different surveying techniques is today still mandatory or, considering the technical advances of each technology, it is in fact just optional.

  11. Riparian forest restoration: Conflicting goals, trade-offs, and measures of success

    Heather L. Bateman; David M. Merritt; J. Bradley Johnson

    2012-01-01

    Restoration projects can have varying goals, depending on the specific focus, rationale, and aims for restoration. When restoration projects use project-specific goals to define activities and gauge success without considering broader ecological context, determination of project implications and success can be confounding. We used case studies from the Middle Rio...

  12. Performance Evaluation and Field Application of Porous Vegetation Concrete Made with By-Product Materials for Ecological Restoration Projects

    Hwang-Hee Kim

    2016-03-01

    Full Text Available The purpose of this study was to evaluate the performance of porous vegetation concrete block made from blast furnace slag cement containing industrial by-products such as blast furnace slag aggregate and powder. The blocks were tested for void ratio, compressive strength and freeze-thaw resistance to determine the optimal mixing ratio for the porous vegetation block. An economic analysis of the mixing ratio showed that the economic efficiency increased when blast furnace slag aggregate and cement were used. Porous vegetation concrete blocks for river applications were designed and produced. Hydraulic safety, heavy metal elution and vegetation tests were completed after the blocks were applied in the field. The measured tractive force ranged between 7.0 kg/m2 for fascine revetment (vegetation revetment and 16.0 kg/m2 for stone pitching (hard revetment, which ensured sufficient hydraulic stability in the field. Plant growth was measured after the porous vegetation concrete block was placed in the field. Seeds began to sprout one week after seeding; after six weeks, the plant length exceeded 300 mm. The average coverage ratio reached as high as 90% after six weeks of vegetation. These results clearly indicated that the porous vegetation concrete block was suitable for environmental restoration projects.

  13. Development of decontamination, decommissioning and environmental restoration technology

    Lee, Byung Jik; Kwon, H S; Kim, G N. and others

    1999-03-01

    Through the project of 'Development of decontamination, decommissioning and environmental restoration technology', the followings were studied. 1. Development of decontamination and repair technology for nuclear fuel cycle facilities 2. Development of dismantling technology 3. Development of environmental restoration technology. (author)

  14. Clinical study of the marginal microfiltration in restorations with amalgam applying sealant cavitario

    Lahoud Salem, Víctor; Mendoza Zapata, Janet; Vidal Goñi, Raúl

    2014-01-01

    The present study to evaluate the clinical evaluation, marginal leakage of 30 amalgams restorations with sealers cavity and 30 amalgams restorations not sealers cavity. After of 12 months observation in amalgams restorations with sealers cavity 100% success in marginal leakage and not presents of secondary caries, not to have presents clinical cases of sensitivity post-operative and pulp inflammation. El presente estudio consistió en evaluar clínicamente la microfiltración marginal en 30 r...

  15. WIRE project- Soil water repellence in biodiverse semi arid environments: new insights and implications for ecological restoration

    Muñoz-Rojas, Miriam; Jiménez-Morillo, Nicasio T.; Jordan, Antonio; Zavala, Lorena M.; Stevens, Jason; González-Pérez, Jose Antonio

    2017-04-01

    Background Soil water repellency (SWR) can have a critical effect on the restoration of disturbed ecosystems causing poor plant establishment and promoting erosion processes. Although SWR has been reported in most continents of the world for different soil types, climate conditions and land uses, there are still many research gaps in the knowledge of its causes and controlling factors (Doerr et al.,2000; Jordan et al., 2013), particularly in Mediterranean arid semi arid environments which are largely affected by this phenomenon. The WIRE project aims to investigate SWR in soils under different vegetation types of dominant biodiverse ecosystems of Western Australia (WA), e.g. hummock grasslands and Banksia woodlands, as well as characterizing organic compounds that induce hydrophobicity in these soils. Banksia woodlands (BW) are of particular interest in this project. These are iconic ecosystems of WA composed by an overstorey dominated by Proteaceae that are threatened by sand mining activities and urban expansion. Conservation and restoration of these woodlands are critical but despite considerable efforts to restore these areas, the success of current rehabilitation programs is poor due to the high sensitivity of the ecosystem to drought stress and the disruption of water dynamics in mature BW soils that result in low seedling survival rates (5-30%). The main objectives of this collaborative research are: i) to identify SWR intensity and severity under different vegetation types and evaluate controlling factors in both hummock grasslands and BW (ii) to characterize hydrophobic compounds in soils using analytical pyrolysis techniques and iii) to investigate the impact of SWR on water economy in relation with soil functioning and plant strategies for water uptake in pristine BW. Methods In a series of field trials and experimental studies, we measured SWR of soil samples under lab conditions in oven-dry samples (48 h, 105 °C) that were previously collected under

  16. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A

    2001-04-01

    The objectives, the programme, and the achievements of the Site Restoration Department of SCK-CEN in 2000 are summarised. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and activities related to the management of decommissioning projects. The department provides consultancy and services to external organisations.

  17. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A.

    2001-01-01

    The objectives, the programme, and the achievements of the Site Restoration Department of SCK-CEN in 2000 are summarised. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and activities related to the management of decommissioning projects. The department provides consultancy and services to external organisations

  18. Occlusal glass ionomer cermet, resin sandwich and amalgam restorations: a 2-year clinical study.

    Lidums, A; Wilkie, R; Smales, R

    1993-08-01

    This study compared the clinical behavior of a glass ionomer silver cermet (Ketac-Silver), a posterior resin composite (Visio-Molar) used with the "sandwich" technique, and a high-copper amalgam (Dispersalloy) for restoring conventional Class I occlusal cavity preparations. Two dentists placed 116 restorations in the posterior permanent teeth of 35 adults treated at a dental hospital. Restorations were assessed at 6-month intervals over 2 years for bulk loss of material and occlusal wear, surface voids, roughness and cracking, surface and marginal staining, and marginal fracture. Losses of material and surface voids were obvious with the cermet material, with surface crazing or cracking being present in 33% of the restorations. The cermet cannot be recommended as a long-term permanent restorative material if the restorations are likely to be subjected to heavy occlusal stresses and abrasive wear.

  19. Survival Rates from Fracture of Endodontically Treated Premolars Restored with Full-coverage Crowns or Direct Resin Composite Restorations: A Retrospective Study.

    Suksaphar, Warattama; Banomyong, Danuchit; Jirathanyanatt, Titalee; Ngoenwiwatkul, Yaowaluk

    2018-02-01

    The aim of the present study was to compare the survival rates against fracture of premolar endodontically treated teeth (ETT) restored with resin composite or crowns and to identify risk factors associated with the fracture. Data from dental records and radiographs of premolar ETT with postendodontic restorations (ie, resin composite or crowns) were collected between 2012 and 2016 and selected following selected inclusion and exclusion criteria. Tooth location, type of restoration, number of proximal contacts, and amount of tooth surface loss were recorded. The incidence and restorability of postendodontic fractures were identified. Survival rates against fracture of the 2 restoration types were calculated using Kaplan-Meier survival analysis. Any potential factors associated with fractures were identified using Cox proportional hazards models. The survival rate against fracture of ETT restored with crowns (95.1%) was higher than resin composite (77.0%). ETT restored with resin composite with 1 or 2 tooth surface losses and 2 proximal contacts had a high survival rate of 88.5% that was not significantly different from ETT with crowns. A higher incidence of restorability after fracture was observed in teeth restored with resin composite than crowns. The type of restoration and number of proximal contacts were identified as potential risk factors associated with fracture incidence. The survival rate against fracture of ETT restored with crowns was higher than resin composite. However, ETT with 1 or 2 tooth surface losses and 2 proximal contacts and restored with resin composite showed a high survival rate that was comparable with ETT restored with crowns. Copyright © 2017 American Association of Endodontists. Published by Elsevier Inc. All rights reserved.

  20. Long-term temporal trajectories to enhance restoration efficiency and sustainability on large rivers: an interdisciplinary study

    Eschbach, David; Schmitt, Laurent; Imfeld, Gwenaël; May, Jan-Hendrik; Payraudeau, Sylvain; Preusser, Frank; Trauerstein, Mareike; Skupinski, Grzegorz

    2018-05-01

    While the history of a fluvial hydrosystem can provide essential knowledge on present functioning, historical context remains rarely considered in river restoration. Here we show the relevance of an interdisciplinary study for improving restoration within the framework of a European LIFE+ project on the French side of the Upper Rhine (Rohrschollen Island). Investigating the planimetric evolution combined with historical high-flow data enabled us to reconstruct pre-disturbance hydromorphological functioning and major changes that occurred on the reach. A deposition frequency assessment combining vertical evolution of the Rhine thalweg, chronology of deposits in the floodplain, and a hydrological model revealed that the period of incision in the main channel corresponded to high rates of narrowing and lateral channel filling. Analysis of filling processes using Passega diagrams and IRSL dating highlights that periods of engineering works were closely related to fine sediment deposition, which also presents concomitant heavy metal accumulation. In fact, current fluvial forms, processes and sediment chemistry around Rohrschollen Island directly reflect the disturbances that occurred during past correction works, and up to today. Our results underscore the advantage of combining functional restoration with detailed knowledge of the past trajectory to (i) understand the functioning of the hydrosystem prior to anthropogenic disturbances, (ii) characterize the human-driven morphodynamic adjustments during the last 2 centuries, (iii) characterize physico-chemical sediment properties to trace anthropogenic activities and evaluate the potential impact of the restoration on pollutant remobilization, (iv) deduce the post-restoration evolution tendency and (v) evaluate the efficiency and sustainability of the restoration effects. We anticipate our approach will expand the toolbox of decision-makers and help orientate functional restoration actions in the future.

  1. Long-term temporal trajectories to enhance restoration efficiency and sustainability on large rivers: an interdisciplinary study

    D. Eschbach

    2018-05-01

    Full Text Available While the history of a fluvial hydrosystem can provide essential knowledge on present functioning, historical context remains rarely considered in river restoration. Here we show the relevance of an interdisciplinary study for improving restoration within the framework of a European LIFE+ project on the French side of the Upper Rhine (Rohrschollen Island. Investigating the planimetric evolution combined with historical high-flow data enabled us to reconstruct pre-disturbance hydromorphological functioning and major changes that occurred on the reach. A deposition frequency assessment combining vertical evolution of the Rhine thalweg, chronology of deposits in the floodplain, and a hydrological model revealed that the period of incision in the main channel corresponded to high rates of narrowing and lateral channel filling. Analysis of filling processes using Passega diagrams and IRSL dating highlights that periods of engineering works were closely related to fine sediment deposition, which also presents concomitant heavy metal accumulation. In fact, current fluvial forms, processes and sediment chemistry around Rohrschollen Island directly reflect the disturbances that occurred during past correction works, and up to today. Our results underscore the advantage of combining functional restoration with detailed knowledge of the past trajectory to (i understand the functioning of the hydrosystem prior to anthropogenic disturbances, (ii characterize the human-driven morphodynamic adjustments during the last 2 centuries, (iii characterize physico-chemical sediment properties to trace anthropogenic activities and evaluate the potential impact of the restoration on pollutant remobilization, (iv deduce the post-restoration evolution tendency and (v evaluate the efficiency and sustainability of the restoration effects. We anticipate our approach will expand the toolbox of decision-makers and help orientate functional restoration actions in the

  2. Joint Coordinating Committee on environmental restoration and waste management (JCCEM) support, technology transfer, and special projects

    Edgar, D.E.

    1993-01-01

    Argonne National Laboratory (ANL) assisted in identifying and evaluating foreign technologies to meet EM needs; supported the evaluation, removal, and/or revision of barriers to international technology and information transfer/exchange; facilitated the integration and coordination of U.S. government international environmental restoration and waste management activities; and enhanced U.S. industry's competitiveness in the international environmental technology market

  3. 77 FR 21721 - Sierra National Forest, Bass Lake Ranger District, California, Whisky Ecosystem Restoration Project

    2012-04-11

    ... and vigor of conifer stands, reduce the spread and intensity of wildfires within and outside of the Wildland Urban Interface (WUI) and restore other ecological processes. DATES: Comments concerning the scope... on these federal and formerly private lands, combined with the exclusion of fire, have altered forest...

  4. Manager Perspectives on Communication and Public Engagement in Ecological Restoration Project Success

    We argue that public engagement is crucial to achieving lasting ecological success in aquatic restoration efforts, and that the most effective public engagement mechanisms are what we term iterative mechanisms. Here we look to a particular social-ecological system – the restorati...

  5. Comparative study of image restoration techniques in forensic image processing

    Bijhold, Jurrien; Kuijper, Arjan; Westhuis, Jaap-Harm

    1997-02-01

    In this work we investigated the forensic applicability of some state-of-the-art image restoration techniques for digitized video-images and photographs: classical Wiener filtering, constrained maximum entropy, and some variants of constrained minimum total variation. Basic concepts and experimental results are discussed. Because all methods appeared to produce different results, a discussion is given of which method is the most suitable, depending on the image objects that are questioned, prior knowledge and type of blur and noise. Constrained minimum total variation methods produced the best results for test images with simulated noise and blur. In cases where images are the most substantial part of the evidence, constrained maximum entropy might be more suitable, because its theoretical basis predicts a restoration result that shows the most likely pixel values, given all the prior knowledge used during restoration.

  6. Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)

    Gilbert, J.L.

    1998-01-01

    The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454

  7. Environmental Impact Assessment of reservoir construction: new perspectives for restoration economy, and development: the Belo Monte Power Plant case study.

    Tundisi, J G; Matsumura-Tundisi, T; Tundisi, J E M

    2015-08-01

    The Environmental Impact Assessment of reservoir construction can be viewed as a new strategic perspective for the economic development of a region. Based on the principles of a watershed approach a interdisciplinary and multidisciplinary systemic view including biogeophysiographical, economic and socio environmental studies the new vision of a EIA provides a basic substratum for the restoration economy and an advanced model for the true development much well ahead of the modernization aspects of the project of a reservoir construction.

  8. Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program

    1995-01-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  9. Multi-Scalar Governance for Restoring the Brazilian Atlantic Forest: A Case Study on Small Landholdings in Protected Areas of Sustainable Development

    Alaine A. Ball

    2014-04-01

    Full Text Available Implementation of forest restoration projects requires cross-scale and hybrid forms of governance involving the state, the market, civil society, individuals, communities, and other actors. Using a case study from the Atlantic Forest Hotspot, we examine the governance of a large-scale forest restoration project implemented by an international non-governmental organization (NGO on family farmer landholdings located within protected areas of sustainable development. In addition to forest restoration, the project aims to provide an economic benefit to participating farmers by including native species with market potential (fruits, timber in restoration models and by contracting farmers in the planting phase. We employed qualitative methods such as structured interviews and participant observation to assess the effect of environmental policy and multi-scalar governance on implementation and acceptability of the project by farmers. We demonstrate that NGO and farmer expectations for the project were initially misaligned, hampering farmer participation. Furthermore, current policy complicated implementation and still poses barriers to project success, and projects must remain adaptable to changing legal landscapes. We recommend increased incorporation of social science methods in earlier stages of projects, as well as throughout the course of implementation, in order to better assess the needs and perspectives of participants, as well as to minimize trade-offs.

  10. Influence of restoration adjustments on prefrontal blood flow: A simplified NIRS preliminary study.

    Sasaguri, Kenichi; Otsuka, Takero; Tsunashima, Hiroyuki; Shimazaki, Tateshi; Kubo, Kin-Ya; Onozuka, Minoru

    The aim of this study was to examine, after setting several restorations, the influence of adjusted occlusal interference during gum chewing on blood flow in the prefrontal area as determined using near-infrared spectroscopy. The physiological rate was assessed using a visual analog scale (VAS) questionnaire. We selected 16 patients who desired prosthetic restorative treatment on the lateral dentition, and eight healthy volunteers. Subjects were divided into three eight-person groups. One group received restorations on the premolar area (PA), another group received restorations on the molar area (MA), and the control group (CT) received no prosthetic restorations. The spectroscope was fastened to the frontal region of the head after placement of the final restoration, but before adjustment. Pre-adjustment (first gum chewing for CT) blood flow in the prefrontal cortex was measured during gum chewing. Blood flow was again measured during gum chewing after the restoration (second gum chewing for CT) had been adjusted in accordance with the subjective assessment of the patient while wearing the device. The VAS provided quantification of comfort during gum chewing before and after restoration adjustment. For the PA and MA groups, adjusting restorations decreased discomfort significantly during gum chewing. Moreover, in the MA group, prefrontal blood flow was significantly reduced, and blood flow correlated with discomfort. Activation of the prefrontal area may provide an objective criterion for judging the functionality of occlusion after prosthetic occlusal reconstruction and/or orthodontics.

  11. Scientific and interdisciplinary method as support for the restoration project. The balustrade steps of Villa Cerami

    Giulia Sanfilippo

    2015-07-01

    Full Text Available In this work an interdisciplinary study of the weathering forms of the Villa Cerami balustrade, was carried out with the aim to identify the type and causes of these and to plan conservation measures. The studied balustrade adorns and protects the steps of Villa Cerami garden, which is a suggestive example of 18th century ‘urban villa’, located in the very core of the Baroque Catania. Sadly, these stunning steps, whose magnificence and placement characterises the out-door environment of the building, at present suffer from bad degradation conditions, and the decorative details adorning the baluster are affected by irreversible damage. The causes of this ongoing degradation process are: material features, humidity, pollution and the consumption caused by the activities performed in the building. Since 1957 it has been the location of the Faculty of Law of the University of Catania. In this study, three balusters affected by the main weathering forms (biological colonization, black crust and granular disintegration recognised in the entire balustrade, were selected. The lithological type and the weathering forms were defined on the basis of an in situ investigation, using respectively the comparison of materials, to identify the calcarenites type, and the Italian norm UNI 11182 along with the Fitzner formalism, to classify the degradation forms.  A 3D survey of the selected balusters was performed with a time of flight Laser Scanner HDS300 of the Leica Geosystem with the aim to better define the volume and total surfaces of the material parts affected by erosion. The surfaces affected by black crust, were obtained by means of an image modelling technique. Data were used to calculate the damage indices through equations proposed by Fitzner and the limit at break for crushing. The potentiality of this interdisciplinary approach (architects, engineers and geologists is shown with the aim to apply it to the restoration of the entire monument

  12. Teatro zandonai in Rovereto, Italy: a case study for restoration

    Pompoli, Roberto; Prodi, Nicola; Ortega, Irene

    2015-01-01

    Early in 2002 the Municipality of Rovereto, North Italy, planned the theatre restoration works, which were ended in success by reopening of the theatre on October 18th 2014 with the 9th Beethoven Symphony. The most important interventions regarded the raising of the stage tower by 5 m, the revision...

  13. Effect of restoration volume on stresses in a mandibular molar: a finite element study.

    Wayne, Jennifer S; Chande, Ruchi; Porter, H Christian; Janus, Charles

    2014-10-01

    There can be significant disagreement among dentists when planning treatment for a tooth with a failing medium-to-large--sized restoration. The clinician must determine whether the restoration should be replaced or treated with a crown, which covers and protects the remaining weakened tooth structure during function. The purpose of this study was to evaluate the stresses generated in different sized amalgam restorations via a computational modeling approach and reveal whether a predictable pattern emerges. A computer tomography scan was performed of an extracted mandibular first molar, and the resulting images were imported into a medical imaging software package for tissue segmentation. The software was used to separate the enamel, dentin, and pulp cavity through density thresholding and surface rendering. These tissue structures then were imported into 3-dimensional computer-aided design software in which material properties appropriate to the tissues in the model were assigned. A static finite element analysis was conducted to investigate the stresses that result from normal occlusal forces. Five models were analyzed, 1 with no restoration and 4 with increasingly larger restoration volume proportions: a normal-sized tooth, a small-sized restoration, 2 medium-sized restorations, and 1 large restoration as determined from bitewing radiographs and occlusal surface digital photographs. The resulting von Mises stresses for dentin-enamel of the loaded portion of the tooth grew progressively greater as the size of the restoration increased. The average stress in the normal, unrestored tooth was 4.13 MPa, whereas the smallest restoration size increased this stress to 5.52 MPa. The largest restoration had a dentin-enamel stress of 6.47 MPa. A linear correlation existed between restoration size and dentin-enamel stress, with an R(2) of 0.97. A larger restoration volume proportion resulted in higher dentin-enamel stresses under static loading. A comparison of the von Mises

  14. Review of Invasive Riparian Trees that Impact USACE Ecosystem Restoration Projects

    2016-08-01

    often release seeds in periods of stress , including periods when exposed to herbicides or mechanical disturbances. Such characteristics make this...Approved for public release ; distribution is unlimited. ERDC TN-EMRRP-SI-36 August 2016 Review of Invasive Riparian Trees that Impact USACE...various spatial control methods for woody invasive plant removal in densely vegetated riparian habitats. The USACE ecosystem restoration mission has

  15. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  16. Urban forest restoration cost modeling: a Seattle natural areas case study

    Jean M. Daniels; Weston Brinkley; Michael D. Paruszkiewicz

    2016-01-01

    Cities have become more committed to ecological restoration and management activities in urban natural areas. Data about costs are needed for better planning and reporting. The objective of this study is to estimate the costs for restoration activities in urban parks and green space in Seattle, Washington. Stewardship activity data were generated from a new database...

  17. Digital Workflows for Restoration and Management of the Museum Affandi - a Case Study in Challenging Circumstances

    Herbig, U.; Styhler-Aydın, G.; Grandits, D.; Stampfer, L.; Pont, U.; Mayer, I.

    2017-08-01

    The appropriate restoration of architectural heritage needs a careful and comprehensive documentation of the existing structures, which even elaborates, if the function of the building needs special attention, like in museums. In a collaborative project between the Universitas Gadjah Mada, Yogyakarta, Indonesia and two universities in Austria (TU Wien and the Danube University Krems) a restoration and adaptation concept of the Affandi Museum in Yogyakarta is currently in progress. It provides a perfect case study for the development of a workflow to combine data from a building survey, architectural research, indoor climate measurements and the documentation of artwork in a challenging environment, from hot and humid tropical climate to continuous threads by natural hazards like earthquakes or volcanic eruptions. The Affandi Museum houses the collection of Affandi, who is considered to be Indonesia's foremost Expressionist painter and partly designed and constructed the museum by himself. With the spirit of the artist still perceptible in the complex the Affandi Museum is an important part of the Indonesian cultural heritage. Thus its preservation takes special attention and adds to the complexity of the development of a monitoring and maintenance concept. This paper describes the ongoing development of an approach to a workflow from the measurement and research of the objects, both architectural and artwork, to the semantically enriched BIM Model as the base for a sustainable monitoring tool for the Affandi Museum.

  18. DIGITAL WORKFLOWS FOR RESTORATION AND MANAGEMENT OF THE MUSEUM AFFANDI - A CASE STUDY IN CHALLENGING CIRCUMSTANCES

    U. Herbig

    2017-08-01

    Full Text Available The appropriate restoration of architectural heritage needs a careful and comprehensive documentation of the existing structures, which even elaborates, if the function of the building needs special attention, like in museums. In a collaborative project between the Universitas Gadjah Mada, Yogyakarta, Indonesia and two universities in Austria (TU Wien and the Danube University Krems a restoration and adaptation concept of the Affandi Museum in Yogyakarta is currently in progress. It provides a perfect case study for the development of a workflow to combine data from a building survey, architectural research, indoor climate measurements and the documentation of artwork in a challenging environment, from hot and humid tropical climate to continuous threads by natural hazards like earthquakes or volcanic eruptions. The Affandi Museum houses the collection of Affandi, who is considered to be Indonesia's foremost Expressionist painter and partly designed and constructed the museum by himself. With the spirit of the artist still perceptible in the complex the Affandi Museum is an important part of the Indonesian cultural heritage. Thus its preservation takes special attention and adds to the complexity of the development of a monitoring and maintenance concept. This paper describes the ongoing development of an approach to a workflow from the measurement and research of the objects, both architectural and artwork, to the semantically enriched BIM Model as the base for a sustainable monitoring tool for the Affandi Museum.

  19. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  20. Hydrological science and wetland restoration: some case studies from Europe

    2007-01-01

    Full Text Available Throughout the world, wetlands are increasingly being recognised as important elements of the landscape because of their high biodiversity and goods and services they provide to mankind. After many decades of wetland destruction and conversion, large areas of wetlands are now protected under the International Convention on Wetlands (Ramsar and regional or national legislation such as the European Union Habitats Directive. In many cases, there is a need to restore the ecological character of the wetland through appropriate water management. This paper provides examples of scientific knowledge of wetland hydrology that can guide such restoration. It focuses on the need for sound hydrological science on a range of issues including water level control, topography, flood storage, wetland connections with rivers and sustainability of water supply under climate change.

  1. Mount St. Helens Ecosystem Restoration General Reevaluation Study Reconnaissance Report

    2007-07-01

    reproduction observed in impacted streams was attributed to temporary groundwater upwelling. Adult salmon and steelhead that returned to the Toutle River...to 33.5% in 1982. Survival of eggs to hatching stage in volcanic substrate ranged from 50% to 95%. Successful reproduction observed in...areas with native conifers . Look for opportunities to enhance or restore off-channel rearing habitat. 84 A number of habitat constraints still

  2. Projected Impacts of Climate, Urbanization, Water Management, and Wetland Restoration on Waterbird Habitat in California's Central Valley.

    Elliott L Matchett

    Full Text Available The Central Valley of California is one of the most important regions for wintering waterbirds in North America despite extensive anthropogenic landscape modification and decline of historical wetlands there. Like many other mediterranean-climate ecosystems across the globe, the Central Valley has been subject to a burgeoning human population and expansion and intensification of agricultural and urban development that have impacted wildlife habitats. Future effects of urban development, changes in water supply management, and precipitation and air temperature related to global climate change on area of waterbird habitat in the Central Valley are uncertain, yet potentially substantial. Therefore, we modeled area of waterbird habitats for 17 climate, urbanization, water supply management, and wetland restoration scenarios for years 2006-2099 using a water resources and scenario modeling framework. Planned wetland restoration largely compensated for adverse effects of climate, urbanization, and water supply management changes on habitat areas through 2065, but fell short thereafter for all except one scenario. Projected habitat reductions due to climate models were more frequent and greater than under the recent historical climate and their magnitude increased through time. After 2065, area of waterbird habitat in all scenarios that included severe warmer, drier climate was projected to be >15% less than in the "existing" landscape most years. The greatest reduction in waterbird habitat occurred in scenarios that combined warmer, drier climate and plausible water supply management options affecting priority and delivery of water available for waterbird habitats. This scenario modeling addresses the complexity and uncertainties in the Central Valley landscape, use and management of related water supplies, and climate to inform waterbird habitat conservation and other resource management planning. Results indicate that increased wetland restoration

  3. Projected Impacts of Climate, Urbanization, Water Management, and Wetland Restoration on Waterbird Habitat in California's Central Valley.

    Matchett, Elliott L; Fleskes, Joseph P

    2017-01-01

    The Central Valley of California is one of the most important regions for wintering waterbirds in North America despite extensive anthropogenic landscape modification and decline of historical wetlands there. Like many other mediterranean-climate ecosystems across the globe, the Central Valley has been subject to a burgeoning human population and expansion and intensification of agricultural and urban development that have impacted wildlife habitats. Future effects of urban development, changes in water supply management, and precipitation and air temperature related to global climate change on area of waterbird habitat in the Central Valley are uncertain, yet potentially substantial. Therefore, we modeled area of waterbird habitats for 17 climate, urbanization, water supply management, and wetland restoration scenarios for years 2006-2099 using a water resources and scenario modeling framework. Planned wetland restoration largely compensated for adverse effects of climate, urbanization, and water supply management changes on habitat areas through 2065, but fell short thereafter for all except one scenario. Projected habitat reductions due to climate models were more frequent and greater than under the recent historical climate and their magnitude increased through time. After 2065, area of waterbird habitat in all scenarios that included severe warmer, drier climate was projected to be >15% less than in the "existing" landscape most years. The greatest reduction in waterbird habitat occurred in scenarios that combined warmer, drier climate and plausible water supply management options affecting priority and delivery of water available for waterbird habitats. This scenario modeling addresses the complexity and uncertainties in the Central Valley landscape, use and management of related water supplies, and climate to inform waterbird habitat conservation and other resource management planning. Results indicate that increased wetland restoration and additional

  4. Projected impacts of climate, urbanization, water management, and wetland restoration on waterbird habitat in California’s Central Valley

    Matchett, Elliott L.; Fleskes, Joseph

    2017-01-01

    The Central Valley of California is one of the most important regions for wintering waterbirds in North America despite extensive anthropogenic landscape modification and decline of historical wetlands there. Like many other mediterranean-climate ecosystems across the globe, the Central Valley has been subject to a burgeoning human population and expansion and intensification of agricultural and urban development that have impacted wildlife habitats. Future effects of urban development, changes in water supply management, and precipitation and air temperature related to global climate change on area of waterbird habitat in the Central Valley are uncertain, yet potentially substantial. Therefore, we modeled area of waterbird habitats for 17 climate, urbanization, water supply management, and wetland restoration scenarios for years 2006–2099 using a water resources and scenario modeling framework. Planned wetland restoration largely compensated for adverse effects of climate, urbanization, and water supply management changes on habitat areas through 2065, but fell short thereafter for all except one scenario. Projected habitat reductions due to climate models were more frequent and greater than under the recent historical climate and their magnitude increased through time. After 2065, area of waterbird habitat in all scenarios that included severe warmer, drier climate was projected to be >15% less than in the “existing” landscape most years. The greatest reduction in waterbird habitat occurred in scenarios that combined warmer, drier climate and plausible water supply management options affecting priority and delivery of water available for waterbird habitats. This scenario modeling addresses the complexity and uncertainties in the Central Valley landscape, use and management of related water supplies, and climate to inform waterbird habitat conservation and other resource management planning. Results indicate that increased wetland restoration and additional

  5. Effect of severe hurricanes on biorock coral reef restoration projects in Grand Turk, Turks and Caicos Islands.

    Wells, Lucy; Perez, Fernando; Hibbert, Marlon; Clerveaux, Luc; Johnson, Jodi; Goreau, Thomas J

    2010-10-01

    Artificial reefs are often discouraged in shallow waters over concerns of storm damage to structures and surrounding habitat. Biorock coral reef restoration projects were initiated in waters around 5 m deep in Grand Turk, at Oasis (October 2006) and at Governor's Beach (November 2007). Hemi-cylindrical steel modules, 6m long were used, four modules at Oasis and six at Governor's Beach. Each project has over 1200 corals transplanted from sites with high sedimentation damage, and are regularly monitored for coral growth, mortality and fish populations. Corals show immediate growth over wires used to attach corals. Growth has been measured from photographs using a software program and is faster at Governor's Beach. After hurricanes Hanna and Ike (September 2008) the Governor's Beach structure was fully standing since the waves passed straight through with little damage, the Oasis structures which were tie-wired rather than welded had one module collapse (since been replaced with a new, welded structure). Hurricane Ike was the strongest hurricane on record to hit Grand Turk. Most cables were replaced following the hurricanes due to damage from debris and high wave action. The projects lost about a third of the corals due to hurricanes. Most of those lost had only been wired a few days before and had not yet attached themselves firmly. These projects have regenerated corals and fish populations in areas of barren sand or bedrock and are now attractive to snorkelers. High coral survival and low structural damage after hurricanes indicate that Biorock reef restoration can be effective in storm-impacted areas.

  6. Effect of severe hurricanes on Biorock Coral Reef Restoration Projects in Grand Turk, Turks and Caicos Islands

    Lucy Wells

    2010-10-01

    Full Text Available Artificial reefs are often discouraged in shallow waters over concerns of storm damage to structures and surrounding habitat. Biorock coral reef restoration projects were initiated in waters around 5m deep in Grand Turk, at Oasis (October 2006 and at Governor’s Beach (November 2007. Hemi-cylindrical steel modules, 6m long were used, four modules at Oasis and six at Governor’s Beach. Each project has over 1200 corals transplanted from sites with high sedimentation damage, and are regularly monitored for coral growth, mortality and fish populations. Corals show immediate growth over wires used to attach corals. Growth has been measured from photographs using a software program and is faster at Governor’s Beach. After hurricanes Hanna and Ike (September 2008 the Governor’s Beach structure was fully standing since the waves passed straight through with little damage, the Oasis structures which were tie-wired rather than welded had one module collapse (since been replaced with a new, welded structure. Hurricane Ike was the strongest hurricane on record to hit Grand Turk. Most cables were replaced following the hurricanes due to damage from debris and high wave action. The projects lost about a third of the corals due to hurricanes. Most of those lost had only been wired a few days before and had not yet attached themselves firmly. These projects have regenerated corals and fish populations in areas of barren sand or bedrock and are now attractive to snorkelers. High coral survival and low structural damage after hurricanes indicate that Biorock reef restoration can be effective in storm-impacted areas. Rev. Biol. Trop. 58 (Suppl. 3: 141-149. Epub 2010 October 01.

  7. Environmental restoration: Integrating hydraulic control of groundwater, innovative contaminant removal technologies and wetlands restoration--A case study at SRS

    Lewis, C.M.; Serkiz, S.M.; Adams, J.; Welty, M.

    1992-01-01

    The groundwater remediation program at the F and H Seepage Basins, Savannah River Sits (SRS) is a case study of the integration of various environmental restoration technologies at a single waste site. Hydraulic control measures are being designed to mitigate the discharge of groundwater plumes to surface water. One of the primary constituents of the plumes is tritium. An extraction and reinjection scenario is being designed to keep the tritium in circulation in the shallow groundwater, until it can naturally decay. This will be accomplished by extracting groundwater downgradient of the waste sites, treatment, and reinjection of the tritiated water into the water table upgradient of the basins. Innovative in-situ technologies, including electrolytic migration, are being field tested at the site to augment the pump-treat-reinject system. The in-situ technologies target removal of contaminants which are relatively immobile, yet represent long term risks to human health and the environment. Wetland restoration is an integral part of the F and H remediation program. Both in-situ treatment of the groundwater discharging the wetlands to adjust the pH, and replacement of water loss due to the groundwater extraction program ar being considered. Toxicity studies indicate that drought and the effects of low pH groundwater discharge have been factors in observed tree mortality in wetlands near the waste sites

  8. Information needs for habitat protection: Marbled murrelet habitat identification. Restoration project 93051b. Exxon Valdez oil spill restoration project final report

    Kuletz, K.J.; Marks, D.K.; Naslund, N.L.; Goodson, N.G.; Cody, M.B.

    1994-12-01

    To define murrelet nesting habitat in southcentral Alaska, we surveyed inland activity of murrelets and measured habitat features between 1991 and 1993, in Prince William Sound, Kenai Fjords National Park and Afognak Island, Alaska (N=262 sites). Using all study areas, we developed statistical models that explain variation in murrelet activity levels and predict the occurrence of behaviors indicative of nesting, based on temporal, geographic, topographic, weather and habitat variables. The multiple regression analyses explained 52 percent of the variation in murrelet activity level. Stepwise logistic regression was used to identify variables that could predict the occurrence of nesting behaviors. The best model included survey method (from a boat, shore or inland), location relative to the head of a bay, tree diameter and number of potential nesting platforms on trees. Overall, the features indicative of murrelet nesting habitat included low elevation locations near the heads of bays, with extensive forest cover of large old-growth trees.

  9. Hydrodynamic Modeling Analysis for Leque Island and zis a ba Restoration Feasibility Study

    Whiting, Jonathan M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Khangaonkar, Tarang [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-01-31

    Ducks Unlimited, Inc. in collaboration with Washington State Department of Fish and Wildlife (WDFW), and Stillaguamish Tribe of Indians have proposed the restoration of Leque Island and zis a ba (formerly Matterand) sites near the mouth of Old Stillaguamish River Channel in Port Susan Bay, Washington. The Leque Island site, which is owned by WDFW, consists of nearly 253 acres of land south of Highway 532 that is currently behind a perimeter dike. The 90-acres zis a ba site, also shielded by dikes along the shoreline, is located just upstream of Leque Island and is owned by Stillaguamish Tribes. The proposed actions consider the removal or modification of perimeter dikes at both locations to allow estuarine functions to be restored. The overall objective of the proposed projects is to remove the dike barriers to 1) provide connectivity and access between the tidal river channel and the restoration site for use by juvenile migrating salmon and 2) create a self-sustaining tidal marsh habitat. Ducks Unlimited engaged Pacific Northwest National Laboratory (PNNL) to develop a three-dimensional hydrodynamic model of the Port Susan Bay, Skagit Bay, and the interconnecting Leque Island region for use in support of the feasibility assessment for the Leque Island and zis a ba restoration projects. The objective of this modeling-based feasibility assessment is to evaluate the performance of proposed restoration actions in terms of achieving habitat goals while assessing the potential hydraulic and sediment transport impacts to the site and surrounding parcels of land.

  10. In vitro Comparative Evaluation of Various Restorative Materials used for restoring Class III Cavities in Deciduous Anterior Teeth: A Clinical Study.

    Priyank, Harsh; Verma, Ankita; Gupta, Komal; Chaudhary, Esha; Khandelwal, Deepak; Nihalani, Shweta

    2016-12-01

    Beauty standards in today's modernized world scenario are formed by well-aligned and well-designed bright white teeth. One of the major reasons behind patients reporting to dental clinics is pain. Caries in the anterior primary teeth forms one of the major concerns from a restorative point of view. Very few studies are quoted in literature which stresses on the follow-up of anterior restorations in primary teeth. Hence, we evaluated and compared the efficacy of composite resin and resin-modified glass ionomer cement (RGIC) for class III restorations in primary anterior teeth. The present study was conducted in the pediatric dental wing and included a total of 80 patients aged 3 to 5½ years who reported with the chief complaint of carious lesions in the primary anterior teeth. Patients having minimal of a pair of similar appearing small carious lesions on the same proximal surfaces of the deciduous maxillary incisors were included for the study. All the patients were randomly divided into two groups: One in which RGIC restoration was done and other in which composite restoration was done. Cavity preparation was done and filling of the cavity with the restorative materials was carried out. Assessment of the restorations was done at 4, 8, and 12 months time following criteria given by Ryge et al. All the results were analyzed by Statistical Package for the Social Sciences (SPSS) software. Mann-Whitney test and one-way analysis of variance (ANOVA) were used to evaluate the level of significance; p value less than 0.05 was considered as significant. For composite and RGIC restorations, the mean score for anatomic shape was 1.21 and 1.10 respectively. While comparing the clinical parameters, nonsignificant results were obtained between composite and RGIC restorative materials at 4-, 8-, and 12-month interval. On comparing the clinical parameters for individual restorative materials at different time intervals, statistically significant results were obtained only for

  11. The anthropogenic nature of present-day low energy rivers in western France and implications for current restoration projects

    Lespez, L.; Viel, V.; Rollet, A. J.; Delahaye, D.

    2015-12-01

    As in other European countries, western France has seen an increase in river restoration projects. In this paper, we examine the restoration goals, methods and objectives with respect to the long-term trajectory and understanding of the contemporary dynamics of the small low energy rivers typical of the lowlands of Western Europe. The exhaustive geomorphological, paleoenvironmental and historical research conducted in the Seulles river basin (Normandy) provides very accurate documentation of the nature and place of the different legacies in the fluvial systems we have inherited. The sedimentation rate in the Seulles valley bottom has multiplied by a factor of 20 since the end of the Bronze Age and has generated dramatic changes in fluvial forms. Hydraulic control of the rivers and valley bottoms drainage throughout the last millennium has channelized rivers within these deposits. The single meandering channel which characterizes this river today is the legacy of the delayed and complex effects of long term exploitation of the river basin and the fluvial system. Bring to light that the "naturalness" of the restored rivers might be questioned. Our research emphasizes the gap between the poor knowledge of the functioning of these rivers and the concrete objectives of the restoration works undertaken, including dam and weir removal. Account of the long-term history of fluvial systems is required, not only to produce a pedagogic history of the "river degradation" but more fundamentally (i) to situate the current functioning of the fluvial system in a trajectory to try to identify thresholds and anticipate the potential turning points in a context of climate and land use change, (ii) to understand the role of morphosedimentary legacies on the current dynamics, (iii) to open the discussion on reference functioning or expected states and (iv) to open discussion on the sustainability of ecological restoration. To conclude, we point out the necessity to take into account the

  12. Tank farm restoration and safe operation, project W-314, upgrade scope summary report (USSR)

    Jacobson, R.W.

    1997-01-01

    This revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from Alternative Generation Analysis (AGA), customer guidance, and changing requirements. It defines the actual upgrades currently in scope, and provides traceability to the requirements and/or drivers

  13. Risk Management Plan for Tank Farm Restoration and Safe Operations, Project W-314

    MCGREW, D.L.

    2000-01-01

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314

  14. Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations, Project W-314

    MCGREW, D.L.

    2000-01-01

    The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project

  15. Project management plan for the gunite and associated tanks treatability studies project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    1995-12-01

    This plan for the Gunite and Associated Tanks (GAAT) Treatability Studies Project satisfies the requirements of the program management plan for the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program as established in the Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program. This plan is a subtier of several other ER documents designed to satisfy the US Department of Energy (DOE) Order 4700.1 requirement for major systems acquisitions. This project management plan identifies the major activities of the GAAT Treatability Studies Project; establishes performance criteria; discusses the roles and responsibilities of the organizations that will perform the work; and summarizes the work breakdown structure, schedule, milestones, and cost estimate for the project

  16. Do large scale restoration projects reduce within-species traits variability? - Présentées à 2 congrès

    Harzé, Mélanie; Monty, Arnaud; Mahy, Grégory

    2015-01-01

    Dry calcareous grasslands represent local biodiversity hotspots of European temperate regions. They have suffered intensive fragmentations due to due to the abandonment of traditional agropastoral systems and the resulting encroachment, reforestation, urbanization or transformation into arable lands. In order to preserve and enhance their ecological value, a series of ecological restoration projects have been implemented throughout Europe (LIFE+). As habitats restoration costs can be prohibit...

  17. Implications of a valuation study for ecological and social indicators associated with Everglades restoration.

    Seeteram, Nadia A; Engel, Victor; Mozumder, Pallab

    2018-06-15

    The Everglades of south Florida, although degraded, imparts vital ecosystem benefits, including contributions to high quality drinking water supplies and habitat for a number of threatened and endangered species. Restoration of the Everglades can improve the provision of these benefits but also may impose tradeoffs with competing societal demands. This study focuses on understanding public preferences for Everglades restoration and estimating the willingness to pay (WTP) values for restored ecosystem services (ES) through the implementation of a discrete choice experiment (DCE). We collected data from 2302 respondents from the general public from an online survey designed to elicit WTP values for selected ecological and social attributes associated with Everglades restoration scenarios. We compare the findings to results from earlier studies (Milon et al., 1999; Milon and Scrogin, 2005), which also estimated WTP values among Floridians for Everglades restoration. For some attributes, WTP for Everglades restoration appears to have slightly increased while for others WTP appears to have decreased. We estimated statewide aggregate WTP values for components of species population restoration up to $2B over 10 years. Several factors impeded a direct comparison of current and historical WTP values, including time elapsed, different samples and sampling methods- which may have implications for integrating ecosystem service valuation studies into water management decisions. Copyright © 2018 Elsevier B.V. All rights reserved.

  18. Planning for environmental restoration of uranium mining and milling sites in Central and Eastern Europe. Proceedings of a workshop held under the technical co-operation project RER/9/022 on environmental restoration in Central and Eastern Europe

    1997-11-01

    An IAEA Regional Technical Co-operation (TC) project RER/9/022 on ''Environmental Restoration'' for central and eastern Europe and the former USSR was launched in 1992 and concluded at the end of 1996. The first phase of this project had the primary purpose of identifying and characterizing radioactively contaminated sites in the region, including evaluation of doses to the general public and other environmental impacts. The main result of this phase of the project were published in IAEA-TECDOC-865. A new 1995-1996 phase of the project focused on the radioactive contamination of uranium mining and milling sites and the development of plans for environmental restoration of these sites. While the 1993-1994 phase aimed at attracting the attention of Member States in the region to a long neglected problem, the second phase served as a stimulus to initiate concrete planning activities that would lead to corrective actions in highly contaminated areas in those countries. As a consequence, the project emphasis shifted from scientific discussions to the identification of responsibilities, planning activities, and the assessment of existing and required resources for the eventual implementation of restoration plans. The 1995-1996 phase of the project consisted of a planning meeting and three workshops that addressed different topical themes. The papers compiled in this publication were presented at the last workshop, held in Felix, Romania, 4-8 November 1996. They summarize national situations in environmental contamination as of the end of 1996 and ongoing or planned actions for remediation

  19. Quantifying the Carbon Balance of Forest Restoration and Wildfire under Projected Climate in the Fire-Prone Southwestern US.

    Hurteau, Matthew D

    2017-01-01

    Climate projections for the southwestern US suggest a warmer, drier future and have the potential to impact forest carbon (C) sequestration and post-fire C recovery. Restoring forest structure and surface fire regimes initially decreases total ecosystem carbon (TEC), but can stabilize the remaining C by moderating wildfire behavior. Previous research has demonstrated that fire maintained forests can store more C over time than fire suppressed forests in the presence of wildfire. However, because the climate future is uncertain, I sought to determine the efficacy of forest management to moderate fire behavior and its effect on forest C dynamics under current and projected climate. I used the LANDIS-II model to simulate carbon dynamics under early (2010-2019), mid (2050-2059), and late (2090-2099) century climate projections for a ponderosa pine (Pinus ponderosa) dominated landscape in northern Arizona. I ran 100-year simulations with two different treatments (control, thin and burn) and a 1 in 50 chance of wildfire occurring. I found that control TEC had a consistent decline throughout the simulation period, regardless of climate. Thin and burn TEC increased following treatment implementation and showed more differentiation than the control in response to climate, with late-century climate having the lowest TEC. Treatment efficacy, as measured by mean fire severity, was not impacted by climate. Fire effects were evident in the cumulative net ecosystem exchange (NEE) for the different treatments. Over the simulation period, 32.8-48.9% of the control landscape was either C neutral or a C source to the atmosphere and greater than 90% of the thin and burn landscape was a moderate C sink. These results suggest that in southwestern ponderosa pine, restoring forest structure and surface fire regimes provides a reasonable hedge against the uncertainty of future climate change for maintaining the forest C sink.

  20. Quantifying the Carbon Balance of Forest Restoration and Wildfire under Projected Climate in the Fire-Prone Southwestern US.

    Matthew D Hurteau

    Full Text Available Climate projections for the southwestern US suggest a warmer, drier future and have the potential to impact forest carbon (C sequestration and post-fire C recovery. Restoring forest structure and surface fire regimes initially decreases total ecosystem carbon (TEC, but can stabilize the remaining C by moderating wildfire behavior. Previous research has demonstrated that fire maintained forests can store more C over time than fire suppressed forests in the presence of wildfire. However, because the climate future is uncertain, I sought to determine the efficacy of forest management to moderate fire behavior and its effect on forest C dynamics under current and projected climate. I used the LANDIS-II model to simulate carbon dynamics under early (2010-2019, mid (2050-2059, and late (2090-2099 century climate projections for a ponderosa pine (Pinus ponderosa dominated landscape in northern Arizona. I ran 100-year simulations with two different treatments (control, thin and burn and a 1 in 50 chance of wildfire occurring. I found that control TEC had a consistent decline throughout the simulation period, regardless of climate. Thin and burn TEC increased following treatment implementation and showed more differentiation than the control in response to climate, with late-century climate having the lowest TEC. Treatment efficacy, as measured by mean fire severity, was not impacted by climate. Fire effects were evident in the cumulative net ecosystem exchange (NEE for the different treatments. Over the simulation period, 32.8-48.9% of the control landscape was either C neutral or a C source to the atmosphere and greater than 90% of the thin and burn landscape was a moderate C sink. These results suggest that in southwestern ponderosa pine, restoring forest structure and surface fire regimes provides a reasonable hedge against the uncertainty of future climate change for maintaining the forest C sink.

  1. STN-stimulation in Parkinson's disease restores striatal inhibition of thalamocortical projection

    Geday, Jacob; Østergaard, Karen; Johnsen, Erik

    2009-01-01

    To test the hypothesis that deep brain stimulation of the subthalamic nucleus (STN) restores the inhibitory output to the striatothalamocortical loop in Parkinson's disease, we obtained functional brain images of blood flow in 10 STN-stimulated patients with Parkinson's disease. Patients were...... in the STN and in the left nucleus lentiformis. Conversely, flow declined in the left supplementary motor area (BA 6), ventrolateral nucleus of the left thalamus, and right cerebellum. Activation of the basal ganglia and deactivation of supplementary motor area and thalamus were both correlated...... with the improvement of motor function. The result is consistent with the explanation that stimulation in resting patients raises output from the STN with activation of the inhibitory basal ganglia output nuclei and subsequent deactivation of the thalamic anteroventral and ventrolateral nuclei and the supplementary...

  2. The cost and feasibility of marine coastal restoration.

    Bayraktarov, Elisa; Saunders, Megan I; Abdullah, Sabah; Mills, Morena; Beher, Jutta; Possingham, Hugh P; Mumby, Peter J; Lovelock, Catherine E

    2016-06-01

    Land-use change in the coastal zone has led to worldwide degradation of marine coastal ecosystems and a loss of the goods and services they provide. Restoration is the process of assisting the recovery of an ecosystem that has been degraded, damaged, or destroyed and is critical for habitats where natural recovery is hindered. Uncertainties about restoration cost and feasibility can impede decisions on whether, what, how, where, and how much to restore. Here, we perform a synthesis of 235 studies with 954 observations from restoration or rehabilitation projects of coral reefs, seagrass, mangroves, salt-marshes, and oyster reefs worldwide, and evaluate cost, survival of restored organisms, project duration, area, and techniques applied. Findings showed that while the median and average reported costs for restoration of one hectare of marine coastal habitat were around US$80000 (2010) and US$1600000 (2010), respectively, the real total costs (median) are likely to be two to four times higher. Coral reefs and seagrass were among the most expensive ecosystems to restore. Mangrove restoration projects were typically the largest and the least expensive per hectare. Most marine coastal restoration projects were conducted in Australia, Europe, and USA, while total restoration costs were significantly (up to 30 times) cheaper in countries with developing economies. Community- or volunteer-based marine restoration projects usually have lower costs. Median survival of restored marine and coastal organisms, often assessed only within the first one to two years after restoration, was highest for saltmarshes (64.8%) and coral reefs (64.5%) and lowest for seagrass (38.0%). However, success rates reported in the scientific literature could be biased towards publishing successes rather than failures. The majority of restoration projects were short-lived and seldom reported monitoring costs. Restoration success depended primarily on the ecosystem, site selection, and techniques

  3. A Restorative Justice Approach to Empathy Development in Sex Offenders: An Exploratory Study

    Roseman, Christopher P.; Ritchie, Martin; Laux, John M.

    2009-01-01

    The authors describe an exploratory study in sex offender treatment using a restorative justice approach to examine the shame, guilt, and empathy development of convicted sexual offenders. Implications for clinical practice and future research are highlighted. (Contains 3 tables.)

  4. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  5. Experiencing Restorative Justice Practices within the Context of an Academic Course--A Phenomenological Mixed Methods Study

    Dedinsky, Paul C.

    2012-01-01

    This study explored restorative justice arising in the context of an academic high school course in which students learned restorative justice principles and strategies. Given that the literature provided limited guidance of restorative justice in this context, these novel circumstances presented a unique opportunity for study. The central…

  6. Restoration of degraded arid farmland at Project Wadi Attir: Impact of conservation on biological productivity and soil organic matter

    Mor-Mussery, Amir; Helman, David; Ben Eli, Michael; Leu, Stefan

    2017-04-01

    The Israeli Negev Desert, as most Mediterranean drylands, is profoundly degraded. We have been documenting degradation and successful rehabilitation approaches in recent research, aiming at maximizing environmental and economic benefits while restoring healthy dryland soils and perennial vegetation to act as carbon sinks. These methods have been implemented for rehabilitation of Project Wadi Attir's. 50 hectares of heavily degraded farmland suffering from intensive soil erosion (expressed in dense gullies net and massive overland flow). Project Wadi Attir is a groundbreaking initiative of the Bedouin community in the Negev, for establishing a model sustainable agricultural operation. The project was initiated by the US-based Sustainability Laboratory and the Hura Municipal Council. The project is designed to demonstrate implementation of holistic sustainability principles developed by The Lab. The project's ecosystem restoration component involves site development, erosion control, soil conservation and improvement, planting of native and agroforestry trees, together with conservation and protection of biodiversity hotspots and avoiding grazing have, within three years, revealed the high biodiversity and productivity potential of this arid/semi-arid landscape. A number of shrublands and loess plots were subject to strict conservation, avoiding tilling and grazing. Soil fertility, productivity and biodiversity of these conserved plots inside the farm boundaries was compared to similar unprotected plots outside the farm fences by sampling in the field and by using satellite imaging. Our findings indicate a gradual improvement of SOM content specifically in the conserved shrubland area. Water infiltration, herbaceous biomass productivity and ants' activity of the protected plots also significantly increased within 3 years compared to the unprotected control areas. Starting from similar soil organic matter content in 2013 (3.3%) in the rocky slopes, in 2016 1% higher

  7. Towards Biological Restoration of Tehran Megalopolis River Valleys- Case Study: Farahzad River

    Samadi, Nafishe; Oveis Torabi, Seyed; Akhani, Hossein

    2017-04-01

    Towards biological restoration of Tehran megalopolis river-valleys: case study Farahzad river 1Nafiseh Samadi, 2OveisTorabi, 3Hossein Akhani 1Mahsab Shargh Company, Tehran ,Iran, nafiseh19@gmail.com 2 Mahsab Shargh Company, Tehran ,Iran, weg@tna-co.com 3Department of Plant Sciences, Halophytes and C4 Research Laboratory, School of Biology, College of Sciences, University of Tehran, PO Box 14155-6455, Tehran, Iran, akhani@khayam.ut.ac.ir Tehran is located in northcentral parts of Iran on the alluvium of southern Alborz Mountains. Seven rivers originated from the highlands of N Tehran run inside and around the city. Many of these river valleys have been deformed by a variety of urban utilizations such as garden, building, canal, park, autobahn etc. Tehran with more than eight million populations suffered from adverse environmental conditions such as pollution and scarcity of natural habitats for recreational activities. Ecological restoration of altered river valleys of Tehran is one of the priorities of Tehran municipality started as a pilot project in Farahzad river. Intensive disturbance, conversion into various urban utilization, illegal building construction, waste water release into the river, garbage accumulation, artificial park constructions and domination of invasive species have largely altered the river. Parts of the river located in Pardisan Nature Park was studied before its complete deformation into a modern park. The riparian vegetation consisted of Tamarix ramosissima and Salix acmophylla shrubs with large number of aquatic and palustric plants. The norther parts of the river still contain semi-natural vegetation which change into patchy and intensive degraded habitats towards its southern parts. In northern parts of valley there are old gardens of Morus alba and Juglans regia, and planted trees such as Plataneus oreientalis and Acer negundo. Salix acmophylla, Fraxinus excelsior and Celtis caucasica are native species growing on river margin or

  8. Beyond Restoration. Valorization of the Public. Monumental Heritage Asset The Istituto degli Innocenti and the MUDI Project

    Carlo Terpolilli

    2012-04-01

    Full Text Available While protection of our collective monumental heritage is a value and an objective we pass along to future generations, at the same time it must be conceived of a commitment to making these assets available to citizens of the present time. This means applying the disciplines of preservation and restoration and at the same time going beyond with a cultural approach that interprets the monumental asset as a fabbrica; that is, as a place of ongoing design activity: a workshop for a work in progress. This approach necessitates programs for valorization and productive investments that operate in full respect of the assets themselves while employing the innovative tools available for ensuring that the asset as a whole produces income. This is the framework for the MUDI project in Florence.

  9. 78 FR 26319 - Deepwater Horizon Oil Spill; Proposal of Future Early Restoration Projects and Environmental Reviews

    2013-05-06

    ... selected and implemented in accordance with the Oil Pollution Act of 1990 (OPA), the Framework Agreement... oil spill under the Oil Pollution Act 1990 (OPA; 33 U.S.C. 2701 et seq.). Pursuant to OPA, federal and... cost of this project is approximately $3.5 million. Sea Rim State Park Amenities (Jefferson County...

  10. Restoring the Power Projection Capabilities of the U.S. Armed Forces

    2017-02-16

    stealthy UAVs; swarms of small, expendable UAVs; and robotic sensors on the surface. The idea is to spread sensors across a number of different...powered exoskeleton , also known as the Talon Project • Develop swarming and autonomous unmanned vehicles a David Ochmanek, Peter A. Wilson, Brenna

  11. 77 FR 21722 - Gore Creek Restoration Project; Intent To Prepare an Environmental Impact Statement

    2012-04-11

    ... District Ranger, P.O. Box 7, Yampa, Colorado 80483 or email comments to comments-rocky-mountain-medicine... causing adverse impacts to stream networks within the project boundary. Proposed Action The Yampa Ranger..., road decommissioning, new road construction, and dispersed campsite decommissioning along streams...

  12. Public participation in environmental decision-making: a case study of ecosystem restoration in South FloridaPublic participation in environmental decision-making: a case study of ecosystem restoration in South Florida

    Ogden, Laura

    2006-01-01

    The “ecosystem” is the conceptual model guiding environmental restoration projects in the Florida Everglades, a large wetlands region in the southern United States. According to applied ecological frameworks, ecosystems are geographies (of various temporal and spatial scales) where systemic interrelationships of organisms and habitat occur. With current project estimates at 14.8 billion dollars, ecosystem restoration in South Florida represents one of the largest and most expensive environmen...

  13. Study on monitoring ecological restoration in Jiuli mining area by SAR image

    Wei, Na; Chen, Fu; Tang, Qian

    2011-10-01

    The ecological restoration in mining area is one of the study hot spots in the field of resources and environment at present. The vegetation biomass is used as the ecological restoration evaluation index in mining area in the paper. The synthetic aperture radar image after ecological restoration in mining area is used to classify different kinds of vegetation covers. Integrating the field data and the data of L band, the average total backward scattering coefficient which corresponds to the synthetic aperture radar image is calculated and the relation model between the average total backward scattering coefficient and vegetation biomass is established. At last the vegetation biomass is assessed in Jiuli mining area. The results show that the vegetation biomass characteristics which are assessed by using synthetic aperture radar image data and the field data of vegetation biomass characteristics have better consistency in Jiuli mining area. The effects of ecological restoration can be evaluated by using this relation model effectively and accurately.

  14. The CEDICAE and the paper collections conservation and restoration Laboratory at CNEA : present and future organization and projects

    Calvo, Ana M.; Semino, Maria S.; Romero, Gregoria O.; Alfaro, Laura S.; Miranda, Maria V.; Chinen, Silvia P.

    2009-01-01

    In Ezeiza Atomic Center (CAE), there is a working group formed by staff members from a Documentation and Information Center known as 'Lic. Maria Isabel Gonzalez' (CEDICAE) and from the CNEA Paper Collections Conservation and Restoration Laboratory. New personnel were hired in 2007, which allowed the reorganization of tasks and gave way to the creation of new projects. By conducting weekly morning meetings, the working group decided to organize and plan the activities that had to be conducted. From the first moment, the main objective of the group was to offer a service of excellence, i.e. to provide a duly and timely response to the bibliographical requests made by users, to perform tasks in the laboratory, to train members in diverse subjects of preventive conservation, surveys and evaluations of archives and libraries, and tasks of restoration of our own material and material from third parties. Among the projects carried out by the CEDICAE, the following are included: Firstly, the continuous training and education of its personnel, training of users in topics dealing with the use of the MINCyT Library, participation in the Internal Network of Libraries (REDIN) in order to adopt a joint policy by CNEA libraries, participation in the Network RRIAN (Regional Network of Information for Latin America and the Caribbean in the Nuclear Field), participation in the Federal Network of Libraries and Information, with the National Commission of Public Libraries (CONABIP) and with the Documentation Center of the Ministry of Economy and so on. It has worked in training of personnel working at the institutions that submit requests to the Laboratory (SERPAJ, Monastery of San Francisco, Ministry of Economy, CONABIP, etc) regarding topics of preventive conservation. It has realised a mockup of bibliographical recovery of damaged material after any climate disasters and has conducted surveys and evaluations from the point of view of preventive conservation. In this sense and as an

  15. Restoration of Movement using FES: An Introductory Study I

    Ahmed, M.; Huq, M. S.; Ibrahim, B. S. K. K.

    2018-03-01

    FES has been applied for movement restoration, rehabilitation and therapy in spinal cord injury and nervous system failure subjects, whose number rise worldwide every year. Despite the increase, assist devices that are expected to aid healthcare delivery are not in abundance and could be as a result of standards imposed due to the sensitive condition of the subjects. Although closed loop control systems are expected to positively aid in that regards, the delicacy of the plant was a big constraint. An existing model from the works Ferrarin and Pedotti was elaborated from the knee swinging to the sit-to-stand movements and from the two mathematical models it can be inferred that even though similar higher level of excitation would be required for sit-to-stand manoeuvre. As part of research to improve on closed approach for the FES system, an appraisal was successfully done on the neuromuscular model together with fatigue models from the works on Lynch. The remodelled fatigue models to suit the research were presented.

  16. Electronic document management meets environmental restoration recordkeeping requirements: A case study

    Burnham, S.L.

    1995-01-01

    Efforts at migrating records management at five Department of Energy sites operated under management by Lockheed Martin Energy Systems, Inc. for Environmental Restoration (ER) business activities are described. The corporate environment, project definition, records keeping requirements are described first. Then an evaluation of electronic document management technologies and of internal and commercially available systems are provided. Finally adopted incremental implementation strategy and lessons learned are discussed

  17. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  18. Environmental assessment of the Environmental Restoration Project at Sandia National Laboratories/New Mexico

    NONE

    1996-03-01

    Sandia National Laboratories/New Mexico (SNL/NM) is managed and operated for the U.S. Department of Energy (DOE) by Sandia Corporation, a subsidiary of the Lockheed Martin Company. SNL/NM is located on land controlled by DOE within the boundaries of Kirtland Air Force Base (KAFB) in Albuquerque, New Mexico. The major responsibilities of SNL/NM are the support of national security and energy projects. This report provides an environmental assessment of proposed remedial action activities at the solid waste management units at SNL/NM. A risk assessment of health hazards is also discussed.

  19. Spectrophotometric Evaluation of the Pulpal Peroxide Levels in Intact and Restored Teeth - An Invitro Study.

    Patri, Gaurav; Acharya, Gourismita; Agrawal, Pratik; Panda, Vijeta

    2016-08-01

    Hydrogen peroxide (30%) is a commonly used "in office" bleaching agent. Deleterious effects of hydrogen peroxide on the pulp have been observed. The present study was conducted with the aim to evaluate the penetration of 30% hydrogen peroxide into the pulp chamber through intact teeth and through the surface of teeth, restored with either hybrid composite or Resin Modified Glass Ionomer Cement (RMGIC). Sixty extracted human maxillary central incisors were selected and divided into six groups. Two groups were restored with hybrid composite resin and two with RMGIC, while two groups were left intact. The teeth with acetate buffer solution in their pulp cavity were then immersed in either 30% hydrogen peroxide or distilled water depending upon the group, for 60 minutes at 37°C. Then horseradish peroxidase and leucocrystal violet were added to the acetate buffer solution present in the pulp chamber after it was transferred to a test tube and the optical density of the resultant blue solution obtained was measured spectrophotometrically. The data obtained were analyzed using one way ANOVA and Student's t-test. The data obtained established that hydrogen peroxide penetrated into the pulp from the bleaching agent used. Hydrogen peroxide (30%) showed the highest pulpal peroxide level in teeth restored with RMGIC followed by teeth restored with hybrid composite resin and the least amount of penetration was observed in intact teeth. The amount of peroxide penetration into the tooth is more through restored tooth than intact tooth and is also dependant on the type of restorative materials used.

  20. Evaluating the accotink creek restoration project for improving water quality, in-stream habitat, and bank stability

    Struck, S.D.; Selvakumar, A.; Hyer, K.; O'Connor, T.

    2007-01-01

    Increased urbanization results in a larger percentage of connected impervious areas and can contribute large quantities of stormwater runoff and significant quantities of debris and pollutants (e.g., litter, oils, microorganisms, sediments, nutrients, organic matter, and heavy metals) to receiving waters. To improve water quality in urban and suburban areas, watershed managers often incorporate best management practices (BMPs) to reduce the quantity of runoff as well as to minimize pollutants and other stressors contained in stormwater runoff. It is well known that land-use practices directly impact urban streams. Stream flows in urbanized watersheds increase in magnitude as a function of impervious area and can result in degradation of the natural stream channel morphology affecting the physical, chemical, and biological integrity of the stream. Stream bank erosion, which also increases with increased stream flows, can lead to bank instability, property loss, infrastructure damage, and increased sediment loading to the stream. Increased sediment loads may lead to water quality degradation downstream and have negative impacts on fish, benthic invertebrates, and other aquatic life. Accotink Creek is in the greater Chesapeake Bay and Potomac watersheds, which have strict sediment criteria. The USEPA (United States Environmental Protection Agency) and USGS (United States Geological Survey) are investigating the effectiveness of stream restoration techniques as a BMP to decrease sediment load and improve bank stability, biological integrity, and in-stream water quality in an impaired urban watershed in Fairfax, Virginia. This multi-year project continuously monitors turbidity, specific conductance, pH, and water temperature, as well as biological and chemical water quality parameters. In addition, physical parameters (e.g., pebble counts, longitudinal and cross sectional stream surveys) were measured to assess geomorphic changes associated with the restoration. Data

  1. Effects of functional restoration versus 3 hours per week physical therapy: a randomized controlled study.

    Jousset, Nathalie; Fanello, Serge; Bontoux, Luc; Dubus, Valérie; Billabert, Colette; Vielle, Bruno; Roquelaure, Yves; Penneau-Fontbonne, Dominique; Richard, Isabelle

    2004-03-01

    Randomized parallel-group comparative trial with a 6-month follow-up period. To compare, in chronic low back pain patients, the effectiveness of a functional restoration program, including intensive physical training, occupational therapy, and psychological support to an active individual therapy consisting of 3 hours physical therapy per week during 5 weeks. Controlled studies conducted in the United States showed a benefit of functional restoration in patients with low back pain, especially on return to work. Randomized Canadian and European trials had less favorable results. In France, there has been up to now no randomized study. Controlled studies suggested a positive effect of functional restoration programs. Eighty-six patients with low back pain were randomized to either the functional restoration (44 patients) or the active individual therapy (42 patients) program. One person in each group never started the program. Two patients did not complete the functional restoration program, and one was lost to follow-up at 6 months. The mean number of sick-leave days in the 2 previous years was 6 months. After adjustment on the variable "workplace enrolled in an ergonomic program", the mean number of sick-leave days was significantly lower in the functional restoration group. Physical criteria and treatment appreciation were also better. There was no significant difference in the intensity of pain, the quality of life and functional indexes, the psychological characteristics, the number of contacts with the medical system, and the drug intake. This study demonstrates the effectiveness of a functional restoration program on important outcome measures, such as sick leave, in a country that has a social system that protects people facing difficulties at work.

  2. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  3. Data-driven Inquiry in Environmental Restoration Studies

    Zalles, D. R.; Montgomery, D. R.

    2008-12-01

    Place-based field work has been recognized as an important component of geoscience education programs for engaging students. Field work helps students appreciate the spatial extent of data and the systems operating in a locale. Data collected in a place has a temporal aspect that can be explored through representations such as photographs and maps and also though numerical data sets that capture characteristics of place. Yet, experiencing authentic geoscience research in an educational setting requires going beyond fieldwork: students must develop data literacy skills that will enable them to connect abstract representations of spatio-temporal data with place. Educational researchers at SRI International led by Dr. Daniel Zalles, developer of inquiry-based geoscience curricula, and geoscientists at the University of Washington (UW) led by Dr. David Montgomery, Professor of Earth and Space Sciences, are building educational curriculum modules that help students make these connections. The modules concern the environmental history of the Puget Sound area in Washington State and its relevance for the American Indians living there. This collaborative project relies on environmental data collected in the Puget Sound Regional Synthesis Model (PRISM) and Puget Sound River History Project. The data sets are being applied to inquiry-based geoscience investigations at the undergraduate and high school level. The modules consist of problem-based units centered on the data sets, plus geographic and other data representations. The modules will rely on educational "design patterns" that characterize geoscientific inquiry tasks. Use of design patterns will enable other modules to be built that align to the modes of student thinking and practice articulated in the design patterns. The modules will be accompanied by performance assessments that measure student learning from their data investigations. The design principles that drive this project have already been used effectively

  4. Valuing Externalities of Watershed Restoration and Erosion Control Projects in Mediterranean Basins: A Comparative Analysis of the Contingent Valuation and Replacement Cost Methods

    Saez, Maria Del Carmen Almansa; Calatrava-Requena, Javier

    2002-01-01

    The methodology used for Economic Valuation of the Externalities generated by the Watershead Restoration and Erosion Control Projects in the Hydrographic Basins of the Mediterranean Slope, is based on the Replacement Cost Method. Environmental Economics, however, today offer us other methodological possibilities, whose application to the valuation of this type of project may prove to be of interest. It is the case of the Contingent Valuation Method used for the evaluation of the effects of th...

  5. Anacostia River fringe wetlands restoration project: final report for the five-year monitoring program (2003 through 2007)

    Krafft, Cairn C.; Hammerschlag, Richard S.; Guntenspergen, Glenn R.

    2009-01-01

    The 6-hectare (ha) freshwater tidal Anacostia River Fringe Wetlands (Fringe Wetlands) were reconstructed along the mainstem of the Anacostia River in Washington, DC (Photograph 1, Figure 1) during the summer of 2003. The Fringe Wetlands consist of two separate planting cells. Fringe A, located adjacent to Lower Kingman Island, on the west bank of the Anacostia River, occupies 1.6 ha; Fringe B, located on the east bank of the Anacostia River, occupies 4.4 ha. This project is the third in a series of freshwater tidal wetland reconstructions on the Anacostia River designed and implemented by the US Army Corps of Engineers (USACE) Baltimore District and District Department of the Environment (DDOE) on lands managed by the National Park Service (NPS). The first was Kenilworth Marsh, reconstructed in 1993 (Syphax and Hammerschlag 2005); the second was Kingman Marsh, reconstructed in 2000 (Hammerschlag et al. 2006). Kenilworth and Kingman were both constructed in low-energy backwaters of the Anacostia. However, the Fringe Wetlands, which were constructed on two pre-existing benches along the high-energy mainstem, required sheet piling to provide protection from erosive impacts of increased flow and volume of water associated with storm events during the establishment phase (Photograph 2). All three projects required the placement of dredged sediment materials to increase elevations enough to support emergent vegetation (Photograph 3). The purpose of all three wetland reconstruction projects was to restore pieces of the once extensive tidal freshwater marsh habitat that bordered the Anacostia River historically, prior to the dredge and fill operations and sea wall installation that took place there in the early to mid-1900's (Photograph 4).

  6. Planning for environmental restoration of uranium mining and milling sites in Central and Eastern Europe. Proceedings of a workshop held under the technical co-operation project RER/9/022 on environmental restoration in Central and Eastern Europe

    NONE

    1997-11-01

    An IAEA Regional Technical Co-operation (TC) project RER/9/022 on ``Environmental Restoration`` for central and eastern Europe and the former USSR was launched in 1992 and concluded at the end of 1996. The first phase of this project had the primary purpose of identifying and characterizing radioactively contaminated sites in the region, including evaluation of doses to the general public and other environmental impacts. The main result of this phase of the project were published in IAEA-TECDOC-865. A new 1995-1996 phase of the project focused on the radioactive contamination of uranium mining and milling sites and the development of plans for environmental restoration of these sites. While the 1993-1994 phase aimed at attracting the attention of Member States in the region to a long neglected problem, the second phase served as a stimulus to initiate concrete planning activities that would lead to corrective actions in highly contaminated areas in those countries. As a consequence, the project emphasis shifted from scientific discussions to the identification of responsibilities, planning activities, and the assessment of existing and required resources for the eventual implementation of restoration plans. The 1995-1996 phase of the project consisted of a planning meeting and three workshops that addressed different topical themes. The papers compiled in this publication were presented at the last workshop, held in Felix, Romania, 4-8 November 1996. They summarize national situations in environmental contamination as of the end of 1996 and ongoing or planned actions for remediation. Refs, figs, tabs.

  7. 78 FR 56921 - South Bay Salt Pond Restoration Project, Phase 2 (Ponds R3, R4, R5, S5, A1, A2W, A8, A8S, A19...

    2013-09-16

    ...-F2013227943] South Bay Salt Pond Restoration Project, Phase 2 (Ponds R3, R4, R5, S5, A1, A2W, A8, A8S, A19... South Bay Salt Pond Restoration Project and consists of restoring and enhancing over 2,000 acres of... Pollution Control Plant located at 700 Los Esteros Road, San Jose, California. The details of the public...

  8. Restoration of Apollo Data by the Lunar Data Project/PDS Lunar Data Node: An Update

    Williams, David R.; Hills, H. Kent; Taylor, Patrick T.; Grayzeck, Edwin J.; Guinness, Edward A.

    2016-01-01

    The Apollo 11, 12, and 14 through 17 missions orbited and landed on the Moon, carrying scientific instruments that returned data from all phases of the missions, included long-lived Apollo Lunar Surface Experiments Packages (ALSEPs) deployed by the astronauts on the lunar surface. Much of these data were never archived, and some of the archived data were on media and in formats that are outmoded, or were deposited with little or no useful documentation to aid outside users. This is particularly true of the ALSEP data returned autonomously for many years after the Apollo missions ended. The purpose of the Lunar Data Project and the Planetary Data System (PDS) Lunar Data Node is to take data collections already archived at the NASA Space Science Data Coordinated Archive (NSSDCA) and prepare them for archiving through PDS, and to locate lunar data that were never archived, bring them into NSSDCA, and then archive them through PDS. Preparing these data for archiving involves reading the data from the original media, be it magnetic tape, microfilm, microfiche, or hard-copy document, converting the outmoded, often binary, formats when necessary, putting them into a standard digital form accepted by PDS, collecting the necessary ancillary data and documentation (metadata) to ensure that the data are usable and well-described, summarizing the metadata in documentation to be included in the data set, adding other information such as references, mission and instrument descriptions, contact information, and related documentation, and packaging the results in a PDS-compliant data set. The data set is then validated and reviewed by a group of external scientists as part of the PDS final archive process. We present a status report on some of the data sets that we are processing.

  9. Evaluation of dental restorations: a comparative study between clinical and digital photographic assessments.

    Moncada, G; Silva, F; Angel, P; Oliveira, O B; Fresno, M C; Cisternas, P; Fernandez, E; Estay, J; Martin, J

    2014-01-01

    The aim of this study was to compare the efficacy of a direct clinical evaluation method with an indirect digital photographic method in assessing the quality of dental restorations. Seven parameters (color, occlusal marginal adaptation, anatomy form, roughness, occlusal marginal stain, luster, and secondary caries) were assessed in 89 Class I and Class II restorations from 36 adults using the modified US Public Health Service/Ryge criteria. Standardized photographs of the same restorations were digitally processed by Adobe Photoshop software, separated into the following four groups and assessed by two calibrated examiners: Group A: The original photograph displayed at 100%, without modifications (IMG100); Group B: Formed by images enlarged at 150% (IMG150); Group C: Formed by digital photographs displayed at 100% (mIMG100), with digital modifications (levels adjustment, shadow and highlight correction, color balance, unsharp Mask); and Group D: Formed by enlarged photographs displayed at 150% with modifications (mIMG150), with the same adjustments made to Group C. Photographs were assessed on a calibrated screen (Macbook) by two calibrated clinicians, and the results were statistically analyzed using Wilcoxon tests (SSPS 11.5) at 95% CI. The photographic method produced higher reliability levels than the direct clinical method in all parameters. The evaluation of digital images is more consistent with clinical assessment when restorations present some moderate defect (Bravo) and less consistent when restorations are clinically classified as either satisfactory (Alpha) or in cases of severe defects (Charlie). The digital photographic method is a useful tool for assessing the quality of dental restorations, providing information that goes unnoticed with the visual-tactile clinical examination method. Additionally, when analyzing restorations using the Ryge modified criteria, the digital photographic method reveals a significant increase of defects compared to those

  10. Radiologic study of peridontal and periapical changes for the restorated teeth

    Ahn, Hyung Kyu

    1978-01-01

    The purpose of this study is to investigate the effect of dental restorations on the periodontal and periapical tissues. The author examined 620 cases of amalgam, 390 cases of fold inlay, 442 cases of crown and 644 cases of bridge through the standard intraoral films being appended in the charts that gad been kept at the Dept. of Oral Diagnosis in Seoul National University Hospital. This study obtained the following results; 1. The restorations of amalgam, gold inlay crown and bridge were found more frequently in female than in male. 2. The restorations of amalgam, gold inlay and crown were found more numerously in mandibular teeth than in maxillary teeth in both sexes. But in the case of crown, the fact is quite the reverse especially in anterior teeth. 3. On the contrary, tn the case of bridge, the restorations of bridge were much more distributed in the maxillary teeth than in the mandibular teeth. 4. Roentgenographic changes of periodontal tissues whose teeth were treated with any type of four restorations were periodontal space widening, lamina dura discontinuity and periapical lesion in the order described in both sexes. 5. On the occasion of between amalgam and gold inlay or between crown and bridge, the differences of periodontal changes were of no consequence. On the other hand, the differences of periodontal changes were apparent between the group of amalgam and gold inlay and the group of crown and bridge.

  11. Impact of stream restoration on flood waves

    Sholtes, J.; Doyle, M.

    2008-12-01

    Restoration of channelized or incised streams has the potential to reduce downstream flooding via storing and dissipating the energy of flood waves. Restoration design elements such as restoring meanders, reducing slope, restoring floodplain connectivity, re-introducing in-channel woody debris, and re-vegetating banks and the floodplain have the capacity to attenuate flood waves via energy dissipation and channel and floodplain storage. Flood discharge hydrographs measured up and downstream of several restored reaches of varying stream order and located in both urban and rural catchments are coupled with direct measurements of stream roughness at various stages to directly measure changes to peak discharge, flood wave celerity, and dispersion. A one-dimensional unsteady flow routing model, HEC-RAS, is calibrated and used to compare attenuation characteristics between pre and post restoration conditions. Modeled sensitivity results indicate that a restoration project placed on a smaller order stream demonstrates the highest relative reduction in peak discharge of routed flood waves compared to one of equal length on a higher order stream. Reductions in bed slope, extensions in channel length, and increases in channel and floodplain roughness follow restoration placement with the watershed in relative importance. By better understanding how design, scale, and location of restored reaches within a catchment hydraulically impact flood flows, this study contributes both to restoration design and site decision making. It also quantifies the effect of reach scale stream restoration on flood wave attenuation.

  12. A comparative study of additive and subtractive manufacturing for dental restorations.

    Bae, Eun-Jeong; Jeong, Il-Do; Kim, Woong-Chul; Kim, Ji-Hwan

    2017-08-01

    Digital systems have recently found widespread application in the fabrication of dental restorations. For the clinical assessment of dental restorations fabricated digitally, it is necessary to evaluate their accuracy. However, studies of the accuracy of inlay restorations fabricated with additive manufacturing are lacking. The purpose of this in vitro study was to evaluate and compare the accuracy of inlay restorations fabricated by using recently introduced additive manufacturing with the accuracy of subtractive methods. The inlay (distal occlusal cavity) shape was fabricated using 3-dimensional image (reference data) software. Specimens were fabricated using 4 different methods (each n=10, total N=40), including 2 additive manufacturing methods, stereolithography apparatus and selective laser sintering; and 2 subtractive methods, wax and zirconia milling. Fabricated specimens were scanned using a dental scanner and then compared by overlapping reference data. The results were statistically analyzed using a 1-way analysis of variance (α=.05). Additionally, the surface morphology of 1 randomly (the first of each specimen) selected specimen from each group was evaluated using a digital microscope. The results of the overlap analysis of the dental restorations indicated that the root mean square (RMS) deviation observed in the restorations fabricated using the additive manufacturing methods were significantly different from those fabricated using the subtractive methods (Padditive manufacturing methods (P=.466). Similarly, no significant differences were found between wax and zirconia, the subtractive methods (P=.986). The observed RMS values were 106 μm for stereolithography apparatus, 113 μm for selective laser sintering, 116 μm for wax, and 119 μm for zirconia. Microscopic evaluation of the surface revealed a fine linear gap between the layers of restorations fabricated using stereolithography apparatus and a grooved hole with inconsistent weak scratches

  13. The socioeconomic factors that facilitate or constrain restoration management: Watershed rehabilitation and wet meadow (bofedal) restoration in the Bolivian Andes.

    Hartman, Brett D; Cleveland, David A

    2018-03-01

    Restoration ecology holds promise for addressing land degradation in impoverished rural environments, provided the approach is adapted to rural development settings. While there is a need for increased integration of social dynamics in land restoration, few systematic studies exist. We explored the socioeconomic factors that influence restoration management, including local motives and perceived benefits, incentives, land tenancy, institutional factors, conflict resolution, accessibility, off-farm labor, and outmigration. The study area is a successful watershed rehabilitation and wet meadow restoration project in the Bolivian Andes that began in 1992. We used household survey methods (n = 237) to compare the communities that had conducted the most restoration management with those that had conducted the least. Results suggest that several factors facilitate investments in land restoration, including aligning restoration objectives with local motives and perceived benefits, ensuring incentives are in place to stimulate long-term investments, conflict resolution, private land tenancy, and accessibility. However, higher levels of organization and active leadership can facilitate land restoration on communal lands. Increased livelihood benefits from land restoration helped slow the rate of rural to urban migration, with 24.5% outmigration in the highest restoration management communities compared to 62.1% in the lowest restoration management communities. Results suggest that land restoration projects that integrate community development into project planning and implementation will achieve greater success. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Poverty Alleviation and Environmental Restoration Using the Clean Development Mechanism: A Case Study from Humbo, Ethiopia

    Brown, Douglas R.; Dettmann, Paul; Rinaudo, Tony; Tefera, Hailu; Tofu, Assefa

    2011-08-01

    Poverty, hunger and demand for agricultural land have driven local communities to overexploit forest resources throughout Ethiopia. Forests surrounding the township of Humbo were largely destroyed by the late 1960s. In 2004, World Vision Australia and World Vision Ethiopia identified forestry-based carbon sequestration as a potential means to stimulate community development while engaging in environmental restoration. After two years of consultation, planning and negotiations, the Humbo Community-based Natural Regeneration Project began implementation—the Ethiopian organization's first carbon sequestration initiative. The Humbo Project assists communities affected by environmental degradation including loss of biodiversity, soil erosion and flooding with an opportunity to benefit from carbon markets while reducing poverty and restoring the local agroecosystem. Involving the regeneration of 2,728 ha of degraded native forests, it brings social, economic and ecological benefits—facilitating adaptation to a changing climate and generating temporary certified emissions reductions (tCERs) under the Clean Development Mechanism. A key feature of the project has been facilitating communities to embrace new techniques and take responsibility for large-scale environmental change, most importantly involving Farmer Managed Natural Regeneration (FMNR). This technique is low-cost, replicable, and provides direct benefits within a short time. Communities were able to harvest fodder and firewood within a year of project initiation and wild fruits and other non-timber forest products within three years. Farmers are using agroforestry for both environmental restoration and income generation. Establishment of user rights and local cooperatives has generated community ownership and enthusiasm for this project—empowering the community to more sustainably manage their communal lands.

  15. Analysis of factors affecting failure of glass cermet tunnel restorations in a multi-center study.

    Pilebro, C E; van Dijken, J W

    2001-06-01

    The aim of this study was to analyze factors influencing the failures of tunnel restorations performed with a glass cermet cement (Ketac Silver). Caries activity, lesion size, tunnel cavity opening size, partial or total tunnel, composite lamination or operating time showed no significant correlation to failure rate. Twelve dentists in eight clinics clinically experienced and familiar with the tunnel technique placed 374 restorations. The occlusal sections of fifty percent of the restorations were laminated with hybrid resin composite. The results of the yearly clinical and radiographic evaluations over the course of 3 years were correlated to factors that could influence the failure rate using logistic regression analysis. At the 3-year recall a cumulative number of 305 restorations were available. The cumulative replacement rate was 20%. The main reasons for replacement were marginal ridge fracture (14%) and dentin caries (3%). Another 7% of the restorations which had not been replaced were classified as failures because of untreated dentin caries. The only significant variable observed was the individual failure rate of the participating dentists varying between 9 and 50% (p=0.013).

  16. Risk profile and quality of dental restorations: a cross-sectional study.

    Sonbul, Helal; Birkhed, Dowen

    2010-03-01

    The aims of the present study were (1) to evaluate the percentage of recurrent caries with respect to the estimated caries risk profile obtained with a Cariogram, (2) to evaluate the quality of restorations in a Saudi population with several restorations and (3) to determine the additional value of bite-wing radiographs as an aid to quality evaluation. A total of 803 restorations were examined in 100 adults according to the United States Public Health Service/Ryge criteria. Salivary and microbiological factors, dietary habits and plaque index were investigated. The Cariogram was used to evaluate the risk profiles. Class II bite-wing radiographs (n = 281) were taken to examine the marginal integrity and the anatomic form proximally. The patients were categorized according to 'the chance of avoiding caries' into three risk groups: 0%-20% (n = 38), 21%-40% (n = 28) and 41%-100% (n = 34). ANOVA revealed statistically significant differences between the risk groups with respect to the recurrent caries (P percentage of the total restorations (56%) were diagnosed with recurrent caries. The quality of anatomic form and surface texture was unacceptable in the majority of cases. After adding the evaluations of class II bite-wings, the percentage of unacceptable restorations increased by 28% and 17% with regard to marginal integrity and anatomic form, respectively (P percentage 'chance of avoiding caries' as estimated by the Cariogram. The importance of bite-wings was emphasized as an aid to quality evaluation.

  17. Web application to access U.S. Army Corps of Engineers Civil Works and Restoration Projects information for the Rio Grande Basin, southern Colorado, New Mexico, and Texas

    Archuleta, Christy-Ann M.; Eames, Deanna R.

    2009-01-01

    The Rio Grande Civil Works and Restoration Projects Web Application, developed by the U.S. Geological Survey in cooperation with the U.S. Army Corps of Engineers (USACE) Albuquerque District, is designed to provide publicly available information through the Internet about civil works and restoration projects in the Rio Grande Basin. Since 1942, USACE Albuquerque District responsibilities have included building facilities for the U.S. Army and U.S. Air Force, providing flood protection, supplying water for power and public recreation, participating in fire remediation, protecting and restoring wetlands and other natural resources, and supporting other government agencies with engineering, contracting, and project management services. In the process of conducting this vast array of engineering work, the need arose for easily tracking the locations of and providing information about projects to stakeholders and the public. This fact sheet introduces a Web application developed to enable users to visualize locations and search for information about USACE (and some other Federal, State, and local) projects in the Rio Grande Basin in southern Colorado, New Mexico, and Texas.

  18. PUREX transition project case study

    Jasen, W.G.

    1996-01-01

    In December 1992, the US Department of Energy (DOE) directed that the Plutonium-Uranium Extraction (PUREX) Plant be shut down and deactivated because it was no longer needed to support the nation's production of weapons-grade plutonium. The PUREX/UO 2 Deactivation Project will establish a safe and environmentally secure configuration for the facility and preserve that configuration for 10 years. The 10-year span is used to predict future maintenance requirements and represents the estimated time needed to define, authorize, and initiate the follow-on decontamination and decommissioning activities. Accomplishing the deactivation project involves many activities. Removing major hazards, such as excess chemicals, spent fuel, and residual plutonium are major goals of the project. The scope of the PUREX Transition Project is described within

  19. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    NONE

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs.

  20. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs

  1. Management & Communication: Project Management Case Study

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  2. Water quality in South San Francisco Bay, California: current condition and potential issues for the South Bay Salt Pond Restoration Project.

    Grenier, J Letitia; Davis, Jay A

    2010-01-01

    The SBSPRP is an extensive tidal wetland restoration project that is underway at the margin of South San Francisco Bay, California. The Project, which aims to restore former salt ponds to tidal marsh and manage other ponds for water bird support, is taking place in the context of a highly urbanized watershed and an Estuary already impacted by chemical contaminants. There is an intimate relationship between water quality in the watershed, the Bay, and the transitional wetland areas where the Project is located. The Project seeks to restore habitat for endangered and endemic species and to provide recreational opportunities for people. Therefore, water quality and bioaccumulation of contaminants in fish and wildlife is an important concern for the success of the Project. Mercury, PCBs, and PBDEs are the persistent contaminants of greatest concern in the region. All of these contaminants are present at elevated concentrations both in the abiotic environment and in wildlife. Dioxins, pyrethroids, PAHs, and selenium are also problematic. Organochlorine insecticides have historically impacted the Bay, and they remain above thresholds for concern in a small proportion of samples. Emerging contaminants, such as PFCs and non-PBDE flame retardants, are also an important water quality issue. Beyond chemical pollutants, other concerns for water quality in South San Francisco Bay exist, and include biological constituents, especially invasive species, and chemical attributes, such as dissolved oxygen and salinity. Future changes, both from within the Project and from the Bay and watershed, are likely to influence water quality in the region. Project actions to restore wetlands could worsen, improve, or not affect the already impaired water quality in South Bay. Accelerated erosion of buried sediment as a consequence of Project restoration actions is a potentially serious regional threat to South Bay water and sediment quality. Furthermore, the planned restoration of salt ponds

  3. An outline of a model-based expert system to identify optimal remedial strategies for restoring contaminated aquatic ecosystems: the project MOIRA

    Appelgren, A.; Bergstrom, U.; Brittain, J.; Monte, L.

    1996-10-01

    The present report describes the fundamental principles of the research programme MOIRA (a model based computerized system for management support to Identify optimal remedial strategies for Restoring radionuclide contaminated Aquatic ecosystems and drainage areas) financed by the EC (European Community) (Contract N F14P-CT96-0036). The interventions to restore radionuclides contaminated aquatic systems may result in detrimental ecological, social and economical effects. Decision makers must carefully evaluate these impacts. The main aim of the MOIRA project is the development of an expert system based on validated models predicting the evolution of the radioactive contamination of fresh water systems following countermeasure applications and their relevant ecological, social and economical impacts. The expert system will help decision makers, that are not necessarily gifted with experience in environmental modeling, to identify optimal remedial strategies for restoring contaminated fresh water systems

  4. An outline of a model-based expert system to identify optimal remedial strategies for restoring contaminated acquatic ecosystems: The project ``moira``

    Appelgren, A.; Bergstrom, U. [Studsvik Eco and AB, Nykoping (Sweden); Brittain, J. [Oslo Univ. (Norway). LFI Zoological Museum; Gallego Diaz, E. [Madrid Universidad Politecnica (Spain). Dept. de Ingenieria Nuclear; Hakanson, L. [KEMA Nuclear, Arnhem (Niger); Monte, L. [ENEA, Centro Ricerche Casaccia, Rome (Italy). Dip. Ambiente

    1996-10-01

    The present report describes the fundamental principles of the research programme MOIRA (a model based computerized system for management support to Identify optimal remedial strategies for Restoring radionuclide contaminated Aquatic ecosystems and drainage areas) financed by the EC (European Community) (Contract N F14P-CT96-0036). The interventions to restore radionuclides contaminated aquatic systems may result in detrimental ecological, social and economical effects. Decision makers must carefully evaluate these impacts. The main aim of the MOIRA project is the development of an expert system based on validated models predicting the evolution of the radioactive contamination of fresh water systems following countermeasure applications and their relevant ecological, social and economical impacts. The expert system will help decision makers, that are not necessarily gifted with experience in environmental modeling, to identify optimal remedial strategies for restoring contaminated fresh water systems.

  5. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  6. Using plant functional traits to guide restoration: A case study in California coastal grassland

    Sandel, Brody Steven; Corbin, Jeffrey; Krupa, Monica

    2011-01-01

    Restoration ecology can benefit greatly from developments in trait-based ecology that enable improved predictions of how the composition of plant communities will respond to changes in environmental conditions. Plant functional traits can be used to guide the restoration of degraded habitats...... generally from the treatments. Carbon addition led to large intraspecific trait shifts, with individuals in C addition plots having smaller, denser leaves and shorter stature. Species' trait plasticity, however, was not related to the community composition response to C addition.   Our study indicates...

  7. Effectiveness of hydrological forest restoration projects on soil erosion control in Mediterranean catchment

    Castillo, V. M.; Boix Fayos, C.; Vente, J. de; Martinez-Mena, M.; Barbera, G. G.

    2009-01-01

    Extensive land use changes have occurred in many Mediterranean catchments as a result of reforestation and the abandonment of agricultural activities. Besides this, the establishment of check-dams has been promoted to reduce soil erosion and sediment transport. In this study a combination of field work, mapping and modelling was used to test influence of land use scenarios with and without sediment control structures on sediment yield at catchment scale. Model simulation shows that in a scenario without check-dams, the land used changes between 1956 and 1997 caused a progressive decrease in sediment yield of 54%. In a scenario without land use changes but with check-dams, about 77% of the sediment yield was retained behind the dams. Both land use changes and check-dams are effective measures decreasing sediment yield in catchment, however they act at very different temporal scales. (Author) 5 refs.

  8. Carbon Dioxide Emission Evaluation of Porous Vegetation Concrete Blocks for Ecological Restoration Projects

    Hwang-Hee Kim

    2017-02-01

    Full Text Available The purpose of this study is to determine the mix proportions that can minimize CO2 emissions while satisfying the target performance of porous vegetation concrete. The target performance of porous vegetation concrete was selected as compressive strength (>15 MPa and void ratio (>25%. This study considered the use of reinforcing fiber and styrene butadiene (SB latex to improve the strength of porous vegetation concrete, as well as the use of blast furnace slag aggregate to improve the CO2 emissions-reducing effect, and analyzed and evaluated the influence of fiber reinforcing, SB latex, and blast furnace slag aggregate on the compressive strength and CO2 emissions of porous vegetation concrete. The CO2 emissions of the raw materials were highest for cement, followed by aggregate, SB latex, and fiber. Blast furnace slag aggregate showed a 30% or more CO2 emissions-reducing effect versus crushed aggregate, and blast furnace slag cement showed a 78% CO2 emissions-reducing effect versus Portland cement. The CO2 emissions analyses for each raw material showed that the CO2 emissions during transportation were highest for the aggregate. Regarding CO2 emissions in each production stage, the materials stage produced the highest CO2 emissions, while the proportion of CO2 emissions in the transportation stage for each raw material, excluding fiber, were below 3% of total emissions. Use of blast furnace slag aggregate in porous vegetation concrete produced CO2 emissions-reducing effects, but decreased its compressive strength. Use of latex in porous vegetation concrete improved its compressive strength, but also increased CO2 emissions. Thus, it is appropriate to use latex in porous vegetation concrete to improve its strength and void ratio, and to use a blast furnace slag aggregate replacement ratio of 40% or less.

  9. Dental caries, restorations and extractions by dental caries in first permanent molars. Clinical and radiographic study

    Aguiar, Sandra Maria H.C. Avila de; Santos Pinto, Ruy dos

    1996-01-01

    This research analyse by clinical and radiographic study, dental caries, restorations and extractions in 1.600 first permanent molars, from 400 children, both sexes, aged 5 to 13 years old, assisted in the Children's Clinic, Faculdade de Odontologia de Aracatuba, UNESP, in 1994. (author)

  10. Independent Study Project, Topic: Topology.

    Notre Dame High School, Easton, PA.

    Using this guide and the four popular books noted in it, a student, working independently, will learn about some of the classical ideas and problems of topology: the Meobius strip and Klein bottle, the four color problem, genus of a surface, networks, Euler's formula, and the Jordan Curve Theorem. The unit culminates in a project of the students'…

  11. VT River Restoration Data in Lamoille County

    Vermont Center for Geographic Information — (Link to Metadata) Documented river and riparian buffer restoration projects in Lamoille County, Vermont. Restoration includes buffer plantings (trees and shrubs),...

  12. Ecological restoration: Biodiversity and conservation

    Vargas Rios, Orlando

    2011-01-01

    In this essay the principal concepts and methods applied on projects aimed at ecological restoration are reviewed, with emphasis on the relationship between conservation, biodiversity and restoration. The most common definitions are provided and the steps to take into account to develop projects on ecological restoration, which will be determined by the level of degradation of the ecosystem to be intervened.

  13. Energy study of a medieval tower, restored as a museum

    Papadopoulos, A.M.; Avgelis, A. [Aristotle University of Thessaloniki (Greece). Dept. of Mechanical Engineering; Santamouris, M. [National Kapodestrean University, Athens (Greece). Dept. of Applied Physics

    2003-10-01

    Museums are buildings of particular significance due to their function and their status. At the same time they are buildings in which the principles of energy conservation are rarely applied, sometimes without reason. It has been decided by the Hellenic Ministry of Culture to convert a medieval tower, built in the year 1344 as a fortress with 0.8-1.5 m thick walls and almost no windows, into a museum. The present paper discusses the difficulties that arise in the attempt to balance between the indoor climate conditions necessary to protect the exhibits and to provide comfortable conditions to the visitors, whilst respecting the aesthetics and the historical significance of the building. Furthermore, one needs to consider the difficult but necessary task of assessing factors such as the building's shell's thermal conductivity and capacity, the ventilation necessary as well as the indoor air movement, in order to determine the cooling loads. Finally, the challenge lies in designing and dimensioning an effective and efficient HVAC system, which should be as discrete as possible. The present paper aims to present the results of the study, to discuss the expected energy behaviour of the building and to comment on the options for introducing energy conservation techniques. (author)

  14. Estuarine conservation and restoration: the Somme and the Seine case studies (English Channel, France).

    Ducrotoy, Jean-Paul; Dauvin, Jean-Claude

    2008-01-01

    Megatidal estuaries such as the Seine and the Somme (North-Western France) are rather well delimited and human impacts on them are well understood. Since the middle of the 19th Century, there has been a slow but irreversible degradation of the state of these English Channel estuaries. However, current conservation and restoration strategies tend to freeze habitats in a particular state, their status being defined, most often, through a patrimonial or utilitarian approach. Connectedness between biotopes (sensu habitat+community) has a tendency to be neglected, especially with regard to main ecological gradients, i.e., salinity. In this paper, evaluation methodologies are proposed with the intention of assessing changes to ecosystem functions, under anthropogenic disturbance, controlled or otherwise. The Seine (a heavily industrialised ecosystem) is compared to the Somme (considered here for its pseudo-natural features) in order to discriminate between oceanic processes (siltation and plugging of estuaries) and anthropogenic influences. Preservation and restoration of habitats rely on a robust scientific methodology. The multi-scale approach adopted in the projects presented here relies on sensitive socio-ecological assessment procedures, tools for evaluating ecological quality, and well-built monitoring programmes based upon pertinent indicators. Such managerial tools were used to refine strategies and make them compatible with the sustainable co-development of resources in a European context. This paper demonstrates how scientists were able to acquire and apply knowledge in the field of rehabilitation and restoration. Jointly with managers and policy-makers, they have brought scientific information and socio-economics together in order to answer questions about the restoration of sites or habitats and to anticipate future propositions in the spirit of Integrated Coastal Zone Management (ICZM).

  15. ramic restorations

    Ashish R Jain

    2013-01-01

    Full Text Available Rehabilitation of a patient with severely worn dentition after restoring the vertical dimension is a complex procedure and assessment of the vertical dimension is an important aspect in these cases. This clinical report describes the full mouth rehabilitation of a patient who was clinically monitored to evaluate the adaptation to a removable occlusal splint to restore vertical dimension for a period 1 month and provisional restorations to determine esthetic and functional outcome for a period of 3 months. It is necessary to recognizing that form follows function and that anterior teeth play a vital role in the maintenance of oral health. Confirmation of tolerance to changes in the vertical dimension of occlusion (VDO is of paramount importance. Articulated study casts and a diagnostic wax-up can provide important information for the evaluation of treatment options. Alteration of the VDO should be conservative and should not be changed without careful consideration.

  16. How economics can further the success of ecological restoration.

    Iftekhar, Md Sayed; Polyakov, Maksym; Ansell, Dean; Gibson, Fiona; Kay, Geoffrey M

    2017-04-01

    Restoration scientists and practitioners have recently begun to include economic and social aspects in the design and investment decisions for restoration projects. With few exceptions, ecological restoration studies that include economics focus solely on evaluating costs of restoration projects. However, economic principles, tools, and instruments can be applied to a range of other factors that affect project success. We considered the relevance of applying economics to address 4 key challenges of ecological restoration: assessing social and economic benefits, estimating overall costs, project prioritization and selection, and long-term financing of restoration programs. We found it is uncommon to consider all types of benefits (such as nonmarket values) and costs (such as transaction costs) in restoration programs. Total benefit of a restoration project can be estimated using market prices and various nonmarket valuation techniques. Total cost of a project can be estimated using methods based on property or land-sale prices, such as hedonic pricing method and organizational surveys. Securing continuous (or long-term) funding is also vital to accomplishing restoration goals and can be achieved by establishing synergy with existing programs, public-private partnerships, and financing through taxation. © 2016 Society for Conservation Biology.

  17. Long-term River Trajectories to Enhance Restoration Efficiency and Sustainability on the Upper Rhine: an Interdisciplinary Study (Rohrschollen Island, France)

    Eschbach, D.; Laurent, S.; May, J. H.; Imfeld, G.; Payraudeau, S.; Preusser, F.

    2017-12-01

    While the history of a fluvial hydrosystem can provide essential knowledge on present functioning, historical context remains rarely considered in river restoration. Here we show the relevance of an interdisciplinary historical study for improving restoration within the framework of a European LIFE+ project on the French side of the Upper-Rhine (Rohrschollen Island). Planimetric evolution combined with historical high flow data enabled to reconstruct pre-disturbance hydromorphological functioning and major changes that occurred on the reach. A deposition frequency assessment combining vertical evolution of the Rhine thalweg, chronology of deposits in the floodplain and a hydrological model revealed that the period of vertical incision in the main channel corresponded to high rates of narrowing and lateral channel filling. The analysis of filling processes by Passega diagram and IRLS dating highlight that periods of engineering works were closely related to fine sediment deposition, which present also concomitant heavy metal accumulation. In fact, current fluvial forms, processes and sediment chemistry around the Rohrschollen Island directly reflect the disturbances that occurred during past correction works, and up to today. Our results underscore the advantage of combining functional restoration with detailed knowledge of past-trajectory to: (i) understand the functioning of the hydrosystem prior anthropogenic disturbances, (ii) characterize the human-driven morphodynamic adjustments during the two last centuries, (iii) characterize physio-chemical sediment properties to trace anthropogenic activities and evaluate the potential impact of the restoration on pollutant remobilization, (iv) deduce post-restoration evolution and (v) evaluate efficiency and sustainability of the restoration effects. We anticipate our approach to expand the toolbox of decision-makers and help orientating functional restoration actions in the future.

  18. Issues related to uncertainty in projections of hazardous and mixed waste volumes in the U.S. Department of Energy's environmental restoration program

    Picel, K.C.

    1995-01-01

    Projected volumes of contaminated media and debris at US Department of Energy (DOE) environmental restoration sites that are potentially subject to the hazardous waste provisions of the Resource Conservation and Recovery Act are needed to support programmatic planning. Such projections have been gathered in various surveys conducted under DOE's environmental restoration and waste management programs. It is expected that reducing uncertainty in the projections through review of existing site data and process knowledge and through further site characterization will result in substantially lowered projections. If promulgated, the US Environmental Protection Agency's Hazardous Waste Identification Rule would result in potentially even greater reductions in the projections when site conditions are reviewed under the provisions of the new rule. Reducing uncertainty in projections under current and future waste identification rules may be necessary to support effective remediation planning. Further characterization efforts that may be conducted should be designed to limit uncertainty in identifying volumes of wastes to the extent needed to support alternative selection and to minimize costs of remediation

  19. Using unassisted ecosystem development to restore marginal land case study of post mining areas

    Frouz, Jan

    2017-04-01

    When we evaluate efficiency of individual restoration measures we typically compare individual restoration treatments or compare them with initial state or similar ecosystem in surrounding landscape. We argue that sensible way to show added value of restoration measure is to compare them with unassisted ecosystem development. Case study of ecosystem development in Sokolov post mining district (Czech Republic) show that spontaneous succession of ecosystem can be, in many parameters, comparable with various reclamation approaches. In suitable substrates the succession is driven mainly by site topography. In sites which were leveled grassy vegetation develops. In sites where original wave like topography was preserved the ecosystem develops towards forest. In forest sites the development on most of the investigated ecosystem parameters (cower, biomass soil developments, water holding capacity, carbon storage) in succession sites is little bit slower compare to reclaimed plantation during first 15-20 years. However in older sites differences disappear and succession sites show similarity with restored sites. Despite similarity in these ecosystem functions possibilities of spontaneous sites for commercial use has to be explored.

  20. Fracture resistance of class IV fiber-reinforced composite resin restorations: An in vitro study

    P S Praveen Kumar

    2017-01-01

    Full Text Available Objectives: The aim of this study was to evaluate fracture resistance of incisal edge fractures (Class IV restored with a Glass Fiber-reinforced Composite (FRC. Materials and Methods: Twenty-four extracted sound maxillary central incisors were randomly divided into two groups. Group I (control contained untreated teeth. Samples in experimental groups II were prepared by cutting the incisal (one-third part of the crown horizontally and was subjected to enamel preparations, then restored with a Glass FRC. Fracture resistance was evaluated as Newton's for samples tested in a Hounsfield universal testing machine. Failure modes were examined microscopically. Results: Mean peak failure load (Newton's observed in Glass Fiber-reinforced Nanocomposite was 863.50 ± 76.12. The experimental group showed similar types of failure modes with the majority occurring as cohesive and mixed type. 58% of the teeth in Glass FRC group fractured below the cementoenamel junction. Conclusion: Using Fiber reinforced composite substructure under conventional composites in Class IV restorations, the fracture resistance of the restored incisal edge could be increased.

  1. Technical framework for groundwater restoration

    1991-04-01

    This document provides the technical framework for groundwater restoration under Phase II of the Uranium Mill Tailings Remedial Action (UMTRA) Project. A preliminary management plan for Phase II has been set forth in a companion document titled ''Preplanning Guidance Document for Groundwater Restoration''. General principles of site characterization for groundwater restoration, restoration methods, and treatment are discussed in this document to provide an overview of standard technical approaches to groundwater restoration

  2. Strategic planning for instream flow restoration: a case study of potential climate change impacts in the central Columbia River basin.

    Donley, Erin E; Naiman, Robert J; Marineau, Mathieu D

    2012-10-01

    We provide a case study prioritizing instream flow restoration activities by sub-basin according to the habitat needs of Endangered Species Act (ESA)-listed salmonids relative to climate change in the central Columbia River basin in Washington State (USA). The objective is to employ scenario analysis to inform and improve existing instream flow restoration projects. We assess the sensitivity of late summer (July, August, and September) flows to the following scenario simulations - singly or in combination: climate change, changes in the quantity of water used for irrigation and possible changes to existing water resource policy. Flows for four sub-basins were modeled using the Water Evaluation and Planning system (WEAP) under historical and projected conditions of 2020 and 2040 for each scenario. Results indicate that Yakima will be the most flow-limited sub-basin with average reductions in streamflow of 41% under climate conditions of 2020 and 56% under 2040 conditions; 1.3-2.5 times greater than those of other sub-basins. In addition, irrigation plays a key role in the hydrology of the Yakima sub-basin - with flow reductions ranging from 78% to 90% under severe to extreme (i.e., 20-40%) increases in agricultural water use (2.0-4.4 times the reductions in the other sub-basins). The Yakima and Okanogan sub-basins are the most responsive to simulations of flow-bolstering policy change (providing salmon with first priority water allocation and at biologically relevant flows), as demonstrated by 91-100% target flows attained. The Wenatchee and Methow sub-basins do not exhibit similar responsiveness to simulated policy changes. Considering climate change only, we conclude that flow restoration should be prioritized first in the Yakima and Wenatchee sub-basins, and second in the Okanogan and Methow. Considering both climate change and possible policy changes, we recommend that the Yakima sub-basin receive the highest priority for flow restoration activities to sustain

  3. Dementia wander garden aids post cerebrovascular stroke restorative therapy: a case study.

    Detweiler, Mark B; Warf, Carlena

    2005-01-01

    An increasing amount of literature suggests the positive effects of nature in healthcare. The extended life expectancy in the US and the consequent need for long-term care indicates a future need for restorative therapy innovations to reduce the expense associated with long-term care. Moving carefully selected stroke patients' sessions to the peaceful setting of a dementia wander garden, with its designed paths and natural stimuli, may be beneficial. Natural settings have been shown to improve attention and reduce stress--both important therapy objectives in many post-stroke rehabilitation programs. In this case study, using the dementia wander garden for restorative therapy of a non-dementia patient was a novel idea for the restorative therapy group, which does not have a horticultural therapy program. The dementia wander garden stage of the post-stroke rehabilitation helped the patient through a period of treatment resistance. The garden provided both an introduction to the patient's goal of outdoor rehabilitation and a less threatening environment than the long-term care facility hallways. In part because the patient was less self-conscious about manifesting his post-stroke neurological deficits, falling, and being viewed as handicapped when in the dementia wander garden setting, he was able to resume his treatment plan and finish his restorative therapy. In many physical and mental rehabilitation plans, finding a treatment modality that will motivate an individual to participate is a principal goal. Use of a dementia wander garden may help some patients achieve this goal in post-stroke restorative therapy.

  4. Structural Study and Evaluation of Previous Restoration Work of Mohammad 'Ali Pasha Mosque at the Citadel in Cairo

    dr.Yaser Yehya Amin Abdel-Aty

    2011-01-01

    Full Text Available Mohammad 'Ali Pasha Mosque at the Citadel in Cairo is considered one of the main landmarks in Egypt. It majestically stands at a northwestern bend of the Citadel and it is visible from numerous locations in Cairo. It has become the symbol of the Citadel, to the point that its name is given to the whole complex in the colloquial Egyptian parlance. This paper studies analytically the static and dynamic structural behavior of this great mosque using computer numerical modeling techniques, to reach the main reasons for past cracking and failures in its domed-roof and other structural elements, which occurred by the end of 19th Century. A number of 3D-models are analyzed to study the mosque, in both original and after restoration conditions, under static (i.e. dead and live loads and dynamic (i.e. Eigenvector modal analysis, response-spectrum and time-history cases of loading. Besides, structural evaluation of major restoration project, in 1930s, is conducted to determine the current structural safety status of the mosque

  5. Investigating the Value of Restorative Practice: An Action Research Study of One Boy in a Mixed Secondary School

    Standing, Vicky; Fearon, Colm; Dee, Tim

    2012-01-01

    Purpose: In response to an increasingly high level of exclusion rates for boys within secondary school in the UK, this study seeks to explore the value of restorative practice and justice for changing student behaviour. Design/methodology/approach: As a piece of action research, the authors aimed to look at how methods of restorative practice…

  6. Electrocoagulation project: Pilot study testwork

    Donini, J.C.; Garand, D.K.; Hassan, T.A.; Kar, K.L.; Thind, S.S.

    1991-09-01

    When a suspension or emulsion flows between two sacrificial metal electrodes excited by ac, the dispersed phase is consolidated and then settles. Laboratory-scale investigation of this mechanism, called electrocoagulation, and of its areas of application to water treatment were previously completed and a subsequent project was initiated to design and construct pilot-scale equipment consisting of an electrocoagulation cell, power supply, and computerized control system. The constructed pilot plant was used to test the effectiveness of electrocoagulation to clarify coal processing plant effluent. Results obtained with clay suspensions showed that flow conditions in the cell have a major effect on electric power consumption, and a reduction by a factor of three on this crucial cost parameter appeared possible compared to a previously tested batch-scale electrocoagulation system. Results obtained using the coal plant thickener feed closely duplicated those obtained with the clay mixtures. Aluminum electrode consumption, however, remained unchanged compared to the bench-scale tests. Supernatant clarity far exceeded requirements, while settling rate was too low. The settling could be speeded up by appropriate use of chemicals, but such addition affects the coagulation mechanism and reduces supernatant clarity. A tradeoff between settling rate and clarity was thus established. The total cost of treatment was deemed to be in excess of coal company requirements, but the pilot tests revealed much about the electrocoagulation system under continuous flow conditions. The technology is seen as having application in other areas such as municipal and industrial waste treatment. 22 refs., 6 figs., 2 tabs.

  7. Study of radiation damage restoration and antimony ions redistribution in Si(1 0 0) and Si(1 1 1) crystals

    Labbani, R; Chafi, Z

    2002-01-01

    In this work, we study the radiation damage restoration and antimony ions redistribution into and oriented silicon substrates. The samples are implanted with antimony to a dose of 5x10 sup 1 sup 4 Sb sup + cm sup - sup 2 at 60 keV energy, then annealed under oxygen atmosphere at 900 deg. C, 30 min. The thin layer of SiO sub 2 (which is formed on Si surface by dry oxidation and expected to prevent any loss of Sb sup + dopant during Si recovery) is removed by a 10% HF solution. The specimens are analyzed by H sup + Rutherford Backscattering Spectrometry operating at 0.3 MeV energy in both random and channelling modes. The values of the projected range, R sub p , the standard deviation, DELTA R sub p , and the dose of antimony ions, which are estimated with a simple program, are in agreement with tabulated ones. It is also shown that the surface damage restoration is better for Si(1 0 0) samples than for Si(1 1 1) ones, in other words, the radiation damage is more significant in Si(1 1 1) substrates. Moreover,...

  8. An in vitro study of dental enamel wear by restorative materials using radiometric method

    Adachi, Lena Katekawa

    2000-01-01

    There is an increasing demand and interest to study the dental materials wear as well as about the abrasion effect on antagonistic teeth. Due to the fact that the existent restorative materials have no specifications about their abrasiveness, it is necessary the establishment of degrees of comparison among them to support clinical application. In this work, the radiometric method was applied to study the enamel wear caused by another enamel and by restorative materials (Ceramco II, Noritake and Finesse porcelains, Artglass and Targis). The dental enamel made radioactive by irradiation at the IEA-R1m nuclear research reactor under a thermal neutron flux was submitted to wear in a machine which allows sliding motion of an antagonistic surface in contact with this radioactive enamel. The enamel wear was evaluated by measuring beta activity of 32 P transferred to water from this irradiated tooth. Results obtained indicated that dental porcelains cause pronounced enamel wear when compared with that provoked by another enamel or by resin materials. Resin materials caused less enamel wear than another enamel. Vickers microhardness data obtained for antagonistic materials showed a correlation with the wear caused to the enamel. This study allowed to conclude that the radiometric method proposed can be used satisfactorily in the evaluation of enamel wear by restorative materials. This method presents advantages due to quick responses and ease of analyses There is (author)

  9. Study on underground-water restoration of acid in-situ leaching process with electrodialytic desalination

    Huang Chongyuan; Meng Jin; Li Weicai

    2003-01-01

    The study focus undergrounder water restoration of acid in-situ leaching process with electrodialysis desalination in Yining Uranium Mine. It is shown in field test that electrodialysis desalination is an effective method for underground water restoration of acid in-situ leaching process. When TDS of underground-water at the decommissioning scope is 10-12 g/L, and TDS will be less than 1 g/L after the desalination process, the desalination rate is more than 90%, freshwater recovery 60%-70%, power consumption for freshwater recovery 5 kW·h/m 3 , the distance of the desalination flow 12-13 m, current efficiency 80%, and the throughput of the twin membrane 0.22-0.24 m 3 /(m 2 ·d)

  10. A Study for the Restoration of the Sundials in King Sejong Era

    Lee, Yong Sam; Kim, Sang Hyuk

    2011-06-01

    The sundials produced in King Sejong era had the functions of accurate observation instruments and were fabricated in various forms such as Angbuilgu (hemispherical sundial). In this study, we investigated the literature, structural characteristics and principles of Hyeonjuilgu, Cheonpyeongilgu and Jeongnamilgu that were developed in Joseon to have the unique structures. Additionally, the sundials were reviewed in the perspective of technical history by comparing them with the sundials of China. For the restoration of the sundials, we identified the principle in which the light spots and shade of the sun were used, and drew the variations of the altitude and azimuth by the yearly motion of the sun on the Siban on the hemispheric and flat surfaces. Based on these results, we completed the design drawings of the three sundials and proposed the restoration models.

  11. A Study for the Restoration of the Sundials in King Sejong Era

    Yong Sam Lee

    2011-06-01

    Full Text Available The sundials produced in King Sejong era had the functions of accurate observation instruments and were fabricated in various forms such as Angbuilgu (hemispherical sundial. In this study, we investigated the literature, structural characteristics and principles of Hyeonjuilgu, Cheonpyeongilgu and Jeongnamilgu that were developed in Joseon to have the unique structures. Additionally, the sundials were reviewed in the perspective of technical history by comparing them with the sundials of China. For the restoration of the sundials, we identified the principle in which the light spots and shade of the sun were used, and drew the variations of the altitude and azimuth by the yearly motion of the sun on the Siban on the hemispheric and flat surfaces. Based on these results, we completed the design drawings of the three sundials and proposed the restoration models.

  12. Principles of Wetland Restoration

    the return of a degraded ecosystem to a close approximation of its remaining natural potential - is experiencing a groundswell of support across the United States. The number of stream, river, lake, wetland and estuary restoration projects grows yearly

  13. Effect of vegetation structure on breeding territory selection by red-winged blackbirds in a floodplain forest restoration project

    Maria A. Furey; Dirk E. Burhans; Hong He; Michael A. Gold; Bruce E. Cutter

    2003-01-01

    Our research investigates the role of vegetation structure in the selection of breeding territories by red-winged blackbirds (Agelaius phoeniceus) in two floodplain oak-restoration sites. Perches are used extensively by red-winged blackbirds in territorial display during the spring (Yasukawa and Searcy 1995). We hypothesized that breeding territory...

  14. Coronal microleakage with five different temporary restorative materials following walking bleach technique: An ex-vivo study

    G. P. V Srikumar

    2012-01-01

    Full Text Available Context: Walking bleach technique uses 30% hydrogen peroxide and sodium perborate, and this paste mixture causes loosening of the coronal temporary restorative materials and thus decreasing its clinical effectiveness and causing irritation to the patients oral tissues. In the present study, sealing ability of hygroscopic coronal temporary restorative materials were compared with the other commonly used temporary restorative materials. Aim: To evaluate the effects of walking bleach material on the marginal sealing ability and coronal microleakage of the hydrophilic temporary restorative materials with that of the other commonly used temporary restorative materials in endodontic practice. Materials and Methods: Seventy-five extracted human maxillary central incisor teeth were prepared chemo-mechanically and obturated with gutta-percha in lateral condensation technique. Surface of each tooth was double coated with cyanoacrylate glue. All the teeth were randomly divided in to five groups. Out of 15 teeth in each group, 10 teeth served as experimental specimens, in which bleaching agent was placed in the pulp chamber and 5 teeth served as control, in which no bleaching agent was placed. The access cavities were restored with temporary restorative materials being tested per each group respectively. The specimens were then immersed in 1% India ink dye and subjected to thermo cycling for 7 days. All the teeth were longitudinally sectioned and observed with stereomicroscope and were graded according to the depth of linear dye penetration. Statistical Analysis Used: Mann-Whitney U test and Kruskal-Wallis test. Results: Hydrophilic temporary restorative materials Cavit G and Coltosol F have shown minimal coronal dye leakage with better sealing ability when exposed to walking bleach paste mixture in the dye penetration tests compared to other commonly used temporary restorative materials. Conclusion: Marginal sealing ability of Cavit G and Coltosol F were

  15. A study of dentists’ preferences for the restoration of shortened dental arches with partial dentures

    Nassani, Mohammad Zakaria; Ibraheem, Shukran; Al-Hallak, Khaled Rateb; Ali El Khalifa, Mohammed Othman; Baroudi, Kusai

    2015-01-01

    Objective: This study aimed to use a utility method in order to assess dentists’ preferences for the restoration of shortened dental arches (SDAs) with partial dentures. Also, the impact of patient age and length of the SDA on dentists’ preferences for the partial dentures was investigated. Materials and Methods: Totally, 104 subjects holding a basic degree in dentistry and working as staff members in a private dental college in Saudi Arabia were interviewed and presented with 12 scenarios for patients of different ages and mandibular SDAs of varying length. Participants were asked to indicate on a standardized visual analog scale how they would value the health of the patient's mouth if the mandibular SDAs were restored with cobalt-chromium removable partial dentures (RPDs). Results: With a utility value of 0.0 representing the worst possible health state for a mouth and 1.0 representing the best, dentists’ average utility value of the RPD for the SDAs was 0.49 (sd= 0.15). Mean utility scores of the RPDs across the 12 SDA scenarios ranged between 0.35 and 0.61. RPDs that restored the extremely SDAs attracted the highest utility values and dentists’ utility of the RPD significantly increased with the increase in the number of missing posterior teeth. No significant differences in dentists’ mean utility values for the RPD were identified among SDA scenarios for patients of different ages. Conclusion: Restoration of the mandibular SDAs by RPDs is not a highly preferred treatment option among the surveyed group of dentists. Length of the SDA affects dentists’ preferences for the RPD, but patient age does not. PMID:26038647

  16. Effect of CO2 laser on root caries inhibition around composite restorations: an in vitro study.

    de Melo, Jociana Bandeira; Hanashiro, Fernando Seishim; Steagall, Washington; Turbino, Miriam Lacalle; Nobre-dos-Santos, Marinês; Youssef, Michel Nicolau; de Souza-Zaroni, Wanessa Christine

    2014-03-01

    The aim of the present study was to investigate the in vitro effect of CO2 laser on the inhibition of root surface demineralization around composite resin restorations. For this purpose, 30 blocks obtained from human molar roots were divided into three groups: group 1 (negative control), cavity prepared with cylindrical diamond bur + acid etching + adhesive + composite resin restoration; group 2, cavity prepared with cylindrical diamond bur + CO2 laser (5.0 J/cm(2)) + acid etching + adhesive + composite resin; and group 3, cavity prepared with cylindrical diamond bur + CO2 laser (6.0 J/cm(2)) + acid etching + adhesive + composite resin. After this procedure, the blocks were submitted to thermal and pH cycling. Root surface demineralization around the restorations was measured by microhardness analysis. The hardness results of the longitudinally sectioned root surface were converted into percentage of mineral volume, which was used to calculate the mineral loss delta Z (ΔZ). The percentage of mineral volume, ΔZ, and the percentage of demineralization inhibition of the groups were statistically analyzed by using analysis of variance and Tukey-Kramer test. The percentage of mineral volume was higher in the irradiated groups up to 80 μm deep. The ΔZ was significantly lower in the irradiated groups than in the control group. The percentage of reduction in demineralization ranged from 19.73 to 29.21 in position 1 (50 μm), and from 24.76 to 26.73 in position 2 (100 μm), when using 6 and 5 J/cm(2), respectively. The CO2 laser was effective in inhibiting root demineralization around composite resin restorations.

  17. Coordinated Noninvasive Studies (CNS) Project

    Lauter, Judith

    1988-11-01

    Research activities during this period include: data collection related to the interface between complex-sound production and perception, specifically, studies on speech acoustics including two experiments on voice-onset-time variability in productions by speakers of several languages, and a series on acoustical characteristics of emotional expression; data collection regarding individual differences in the effect of stimulus characteristic on relative ear advantages; continuing data analysis and new collections documenting individual differences in auditory evoked potentials, with details related to auditory-systems asymmetries preliminary tests regarding the match between behavioral measures of relative ear advantages and quantitative-electroencephalographic asymmetries observed during auditory stimulation; pilot testing using a combination of Nuclear Magnetic Resonance's (NMR) anatomical-imaging and chemical-spectral-analysis capabilities to study physiological activation in the human brain.

  18. Coordinated Noninvasive Studies (CNS) Project

    1988-11-01

    It Is used to "label’ (e.g., glucose labelled with an isotope of carbon), autoradlography can used to study metabolism (e.g., uptake of dopamIne In...defined dysfunctions, Such as autism and dementia, and to obtain detailed Information regarding brain function even In subjects who cannot actively...man. Ann NY Acad Sc 508: 1-537. Courchesne E (In press) Cerebellar changes In autism . In J Swann and A Messer (Eds) Disorders of the developing

  19. Project JADE. Geo scientific studies

    Munier, R.; Follin, S.; Rhen, I.; Gustafson, Gunnar; Pusch, R.

    2001-08-01

    In the present report an evaluation of the geological impact on various deposition methods is presented. The studied methods are KBS-3 V (vertical deposition), KBS-3 H (horizontal deposition) and MLH (medium long holes).The investigation has been subdivided into three separate studies concerning rock mechanics, hydrogeology and structural geology. These are included as appendices. Various methods have been used for the analyses for example DFN-models (Discrete Fracture Networks), DFN, FEM (Finite Element Method), BEM (Boundary Element Method), DEM (Discrete Element Method) and BayMar (Bayesian-Markov). The prerequisites used for these investigations are based on earlier investigations of the TBM tunnel at the Aespoe Hard Rock Laboratory. As a consequence thereof, the results presented here are specific to the locale but some conclusions of general character still can be made. In short the results of the investigations can be concluded as follows: If the rock mass exhibits a hydraulic anisotropy, the level of acceptance is strongly correlated to the direction of the deposition tunnels (applies to MLH and KBS-3 H). Differences between the methods concerning mechanical stability have been identified. The final choice of method will depend on the possibility to place the deposition tunnels in a favorable orientation. However, engineering can solve the problems associated to instability in the tunnels. KBS-3 (bored deposition tunnels) is recommended for rock masses in which the stress field has a moderate variation in magnitude and orientation. KBS-3 V (drilled and blasted deposition tunnels) and MLH are considered more robust and therefore recommended for rock masses in which the stress field has a large variation in magnitude or orientation. The impact of the fracture array differs for the studied methods. The level of acceptance differs but the differences are considered to be of no practical importance. For the studied rock mass (Aespoe), KBS-3 is recommended. MLH

  20. Case studies of riparian and watershed restoration in the southwestern United States—Principles, challenges, and successes

    Ralston, Barbara E.; Sarr, Daniel A.; Ralston, Barbara E.; Sarr, Daniel A.

    2017-07-18

    Globally, rivers and streams are highly altered by impoundments, diversions, and stream channelization associated with agricultural and water delivery needs. Climate change imposes additional challenges by further reducing discharge, introducing variability in seasonal precipitation patterns, and increasing temperatures. Collectively, these changes in a river or stream’s annual hydrology affects surface and groundwater dynamics, fluvial processes, and the linked aquatic and riparian responses, particularly in arid regions. Recognizing the inherent ecosystem services that riparian and aquatic habitats provide, society increasingly supports restoring the functionality of riparian and aquatic ecosystems.Given the wide range in types and scales of riparian impacts, approaches to riparian restoration can range from tactical, short-term, and site-specific efforts to strategic projects and long-term collaborations best pursued at the watershed scale. In the spirit of sharing information, the U.S. Geological Survey’s Grand Canyon Monitoring and Research Center convened a workshop June 23-25, 2015, in Flagstaff, Ariz. for practitioners in restoration science to share general principles, successful restoration practices, and discuss the challenges that face those practicing riparian restoration in the southwestern United States. Presenters from the Colorado River and the Rio Grande basins, offered their perspectives and experiences in restoration at the local, reach and watershed scale. Outcomes of the workshop include this Proceedings volume, which is composed of extended abstracts of most of the presentations given at the workshop, and recommendations or information needs identified by participants. The organization of the Proceedings follows a general progression from local scale restoration to river and watershed scale approaches, and finishes with restoration assessments and monitoring.

  1. Weight restoration therapy rapidly reverses cortical thinning in anorexia nervosa: A longitudinal study.

    Bernardoni, Fabio; King, Joseph A; Geisler, Daniel; Stein, Elisa; Jaite, Charlotte; Nätsch, Dagmar; Tam, Friederike I; Boehm, Ilka; Seidel, Maria; Roessner, Veit; Ehrlich, Stefan

    2016-04-15

    Structural magnetic resonance imaging studies have documented reduced gray matter in acutely ill patients with anorexia nervosa to be at least partially reversible following weight restoration. However, few longitudinal studies exist and the underlying mechanisms of these structural changes are elusive. In particular, the relative speed and completeness of brain structure normalization during realimentation remain unknown. Here we report from a structural neuroimaging study including a sample of adolescent/young adult female patients with acute anorexia nervosa (n=47), long-term recovered patients (n=34), and healthy controls (n=75). The majority of acutely ill patients were scanned longitudinally (n=35): at the beginning of standardized weight restoration therapy and again after partial weight normalization (>10% body mass index increase). High-resolution structural images were processed and analyzed with the longitudinal stream of FreeSurfer software to test for changes in cortical thickness and volumes of select subcortical regions of interest. We found globally reduced cortical thickness in acutely ill patients to increase rapidly (0.06 mm/month) during brief weight restoration therapy (≈3 months). This significant increase was predicted by weight restoration alone and could not be ascribed to potentially mediating factors such as duration of illness, hydration status, or symptom improvements. By comparing cortical thickness in partially weight-restored patients with that measured in healthy controls, we confirmed that cortical thickness had normalized already at follow-up. This pattern of thinning in illness and rapid normalization during weight rehabilitation was largely mirrored in subcortical volumes. Together, our findings indicate that structural brain insults inflicted by starvation in anorexia nervosa may be reversed at a rate much faster than previously thought if interventions are successful before the disorder becomes chronic. This provides

  2. Restoration of Oral Function for Adult Edentulous Patients with Ectodermal Dysplasia: A Prospective Preliminary Clinical Study.

    Wu, Yiqun; Wang, Xu Dong; Wang, Feng; Huang, Wei; Zhang, Zhiyong; Zhang, Zhiyuan; Kaigler, Darnell; Zou, Duohong

    2015-10-01

    Therapy with zygomatic implants (ZIs) or conventional implants (CIs) has proven to be an effective method to restore oral function for systemically healthy patients. However, it is still a major challenge to fully restore oral function to edentulous adult patients with ectodermal dysplasia (ED). The aim of this study was to determine an effective treatment protocol for restoring oral function using ZIs and CIs to edentulous adult ED patients. Ten edentulous adult ED patients were treated in this study. The treatment protocol involved the following: (1) bone augmentation in the region of the anterior teeth; (2) placement of two ZIs and four CIs in the maxilla, and four CIs in the mandible; (3) fabrication of dental prosthesis; and (4) psychological and oral education. Following treatment of these patients, implant success rates, biological complications, patient satisfaction, and psychological changes were recorded. Although there was evidence of bone graft resorption in the maxilla, bone augmentation of the mandible was successful in all patients. Nine CIs in the maxilla failed and were removed. All ZIs were successful, and the CIs success rates were 77.50% in the maxilla and 100% in the mandible, with a mean of 88.75%. The mean peri-implant bone resorption for the CIs ranged from 1.3 ± 0.4 mm to 1.8 ± 0.6 mm, and four cases exhibited gingival hyperplasia in the maxilla and mandible. One hundred percent of the patients were satisfied with the restoration of their oral function, and >50% of the patients exhibited enhanced self-confidence and self-esteem. This study demonstrates that oral function can be restored in edentulous adult ED patients using a comprehensive and systematic treatment protocol involving psychological and oral education, bone augmentation, implant placement, and denture fabrication. Despite these positive outcomes, bone augmentation remains challenging in the anterior region of the maxilla for edentulous adult ED patients. © 2015

  3. Hydrological Classification, a Practical Tool for Mangrove Restoration

    Van Loon, Anne F.; Te Brake, Bram; Van Huijgevoort, Marjolein H. J.; Dijksma, Roel

    2016-01-01

    Mangrove restoration projects, aimed at restoring important values of mangrove forests after degradation, often fail because hydrological conditions are disregarded. We present a simple, but robust methodology to determine hydrological suitability for mangrove species, which can guide restoration practice. In 15 natural and 8 disturbed sites (i.e. disused shrimp ponds) in three case study regions in south-east Asia, water levels were measured and vegetation species composition was determined....

  4. A Study on Ganui-Dae’s External Form and Its Modeling for Restoration

    Min-Soo Lee

    2013-12-01

    Full Text Available Ganui-Dae, built in the reign of King Sejong, Joseon Dynasty, is a comprehensive observatory. It has various instruments for observation and time signal such as Ganui, Gyupyo(Gnomon, water-hammering type Honui and Honsang, and so on. Studying on Ganui-Dae has been focused on its location, history, criterion, etc, so far. However, studying on its external form and construction method has been conducted insufficiently. This study suggests the model for restoration of Ganui-Dae. The model is based on the analysis about external form of Ganui-Dae in various antique maps, and its construction method in those days.

  5. Identification of remediation needs and technology development focus areas for the Environmental Restoration (ER) Project at Sandia National Laboratories/New Mexico (SNL/NM)

    Tucker, M.D.

    1995-06-01

    The Environmental Restoration (ER) Project has been tasked with the characterization, assessment, remediation and long-term monitoring of contaminated waste sites at Sandia National Laboratories/New Mexico (SNL/NM). Many of these sites will require remediation which will involve the use of baseline technologies, innovative technologies that are currently under development, and new methods which will be developed in the near future. The Technology Applications Program (TAP) supports the ER Project and is responsible for development of new technologies for use at the contaminated waste sites, including technologies that will be used for remediation and restoration of these sites. The purpose of this report is to define the remediation needs of the ER Project and to identify those remediation needs for which the baseline technologies and the current development efforts are inadequate. The area between the remediation needs and the existing baseline/innovative technology base represents a technology gap which must be filled in order to remediate contaminated waste sites at SNL/NM economically and efficiently. In the first part of this report, the remediation needs of the ER Project are defined by both the ER Project task leaders and by TAP personnel. The next section outlines the baseline technologies, including EPA defined Best Demonstrated Available Technologies (BDATs), that are applicable at SNL/NM ER sites. This is followed by recommendations of innovative technologies that are currently being developed that may also be applicable at SNL/NM ER sites. Finally, the gap between the existing baseline/innovative technology base and the remediation needs is identified. This technology gap will help define the future direction of technology development for the ER Project

  6. Project safety studies - nuclear waste management (PSE)

    1981-10-01

    The project 'Safety Studies-Nuclear Waste Management' (PSE) is a research project performed by order of the Federal Minister for Research and Technology, the general purpose of which is to deepen and ensure the understanding of the safety aspects of the nuclear waste management and to prepare a risk analysis which will have to be established in the future. Owing to this the project is part of a series of projects which serve the further development of the concept of nuclear waste management and its safety, and which are set up in such a way as to accompany the realization of that concept. This report contains the results of the first stage of the project from 1978 to mid-1981. (orig./RW) [de

  7. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.2: Planning for environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    NONE

    1996-03-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. It is under these circumstances that the IAEA decided to launch a Technical Co-operation (TC) Project on Environmental Restoration in Central and Eastern Europe. The project was initiated in the latter part of 1992 and ended in 1994. The countries that were involved and represented in this forum are: Belarus, Bulgaria, Croatia, Czech Republic, Estonia, Hungary, Kazakhstan, Poland, Romania, Russian Federation, Slovakia, Slovenia and the Ukraine. Several experts from countries outside the region participated and offered their co-operation throughout the project. Refs, figs, tabs.

  8. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.2: Planning for environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    1996-03-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. It is under these circumstances that the IAEA decided to launch a Technical Co-operation (TC) Project on Environmental Restoration in Central and Eastern Europe. The project was initiated in the latter part of 1992 and ended in 1994. The countries that were involved and represented in this forum are: Belarus, Bulgaria, Croatia, Czech Republic, Estonia, Hungary, Kazakhstan, Poland, Romania, Russian Federation, Slovakia, Slovenia and the Ukraine. Several experts from countries outside the region participated and offered their co-operation throughout the project. Refs, figs, tabs

  9. A Case Study on Nitrogen Uptake and Denitrification in a Restored Urban Stream in Baltimore, Maryland

    Restoring urban infrastructure and managing the nitrogen cycle represent emerging challenges for urban water quality. We investigated whether stormwater control measures (SCMs), a form of green infrastructure, integrated into restored and degraded urban stream networks can influe...

  10. Restorative green outdoor environments at acute care hospitals - case studies in Denmark

    Abdul Shukor, Shureen Faris Binti

    The PhD thesis is based on research which was conducted between 2009 and 2012. It deals with green outdoor environments (GOEs) at acute care hospitals in the capital region of Denmark. The aim of this PhD study is to gain deeper knowledge about the design and use of GOEs which supports mental...... the buildings. The majority of users are satisfied with the existing GOEs and the results gained from the PRS indicate that they regard the GOEs as having potential for mental restoration. The important contributions of this PhD study are that it highlights the importance of having GOE at acute care hospitals...

  11. Restoration and economics: A union waiting to happen?

    Alicia S.T. Robbins; Jean M. Daniels

    2012-01-01

    In this article, our objective is to introduce economics as a tool for the planning, prioritization, and evaluation of restoration projects. Studies that develop economic estimates of public values for ecological restoration employ methods that may be unfamiliar to practitioners. We hope to address this knowledge gap by describing economic concepts in the context of...

  12. Development of decontamination, decommissioning and environmental restoration technology

    Lee, Byung Jik; Kwon, H. S.; Kim, G. N. and others

    1999-03-01

    Through the project of 'Development of decontamination, decommissioning and environmental restoration technology', the followings were studied. 1. Development of decontamination and repair technology for nuclear fuel cycle facilities 2. Development of dismantling technology 3. Development of environmental restoration technology. (author)

  13. Development of decontamination, decommissioning and environmental restoration technology

    Lee, Byung Jik; Kwon, H. S.; Kim, G. N. and others

    1999-03-01

    Through the project of D evelopment of decontamination, decommissioning and environmental restoration technology , the followings were studied. 1. Development of decontamination and repair technology for nuclear fuel cycle facilities 2. Development of dismantling technology 3. Development of environmental restoration technology. (author)

  14. Use of vegetation sampling and analysis to detect a problem within a portion of a prairie restoration project.

    Franson, Raymond; Scholes, Chad; Krabbe, Stephen

    2017-01-02

    In June 2005, the Department of Energy (DOE) began establishing the 60-ha Howell Prairie around the disposal cell at the DOE Weldon Spring Site (WSS). Prairies were historically present in the area of the site. Quantitative Cover sampling was used to quantify Total Cover, Native Grass Cover, Non-Native Grass Cover, Native Forb Cover, Non-Native Forb Cover, Warm Season (C 4 Grass), Cool Season (C 3 Grass), Perennial Cover and Annual Cover, Litter, and Bare Ground. Four permanent vegetation sampling plots were established. The first 4 years of vegetation measurements at Howell Prairie were made during above-average rainfall years on burned and unburned plots. The fifth-year (2012) vegetation measurements were made after below-average rainfall. Five years of results not only document the consistency of the restoration effort in three areas, but also demonstrate deficiencies in Grass Cover in a fourth area. The results are not only useful for Howell Prairie, but will be useful for restoration work throughout the region. Restoration work suffers from a lack of success monitoring and in this case from a lack of available reference areas. Floristic Quality Indices are used to make qualitative comparisons of the site to Konza Prairie sites.

  15. Skjern River Restoration Counterfactual

    Clemmensen, Thomas Juel

    2014-01-01

    In 2003 the Skjern River Restoration Project in Denmark was awarded the prestigious Europa Nostra Prize for ‘conserving the European cultural heritage’ (Danish Nature Agency 2005). In this case, however, it seems that the conservation of one cultural heritage came at the expense of another cultural...... this massive reconstruction work, which involved moving more than 2,7 million cubic meters of earth, cause a lot of ‘dissonance’ among the local population, the resulting ‘nature’ and its dynamic processes are also constantly compromising the preferred image of the restored landscape (Clemmensen 2014......). The presentation offers insight into an on-going research and development project - Skjern River Restoration Counterfactual, which question existing trends and logics within nature restoration. The project explores how the Skjern River Delta could have been ‘restored’ with a greater sensibility for its cultural...

  16. Esmeralda project for studying extensive sodium fire

    Sophy, Y.M.; Roy, D.; Bentz, A.; Gerosa, A.; Noel, H.

    1979-01-01

    This paper describes the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The motivations which prompted the decision to create this research facility are related to construction of the Super-Phenix breeder reactor and to the scale effect problems posed by the use of very large quantities of sodium. Information is included on the dimensions of the installation, the objectives of the project, the means to be employed, the timetable to be followed, and the organization which was created for this project within the context of Franco-Italian cooperation

  17. Drivers of Ecological Restoration: Lessons from a Century of Restoration in Iceland

    Ása L. Aradóttir

    2013-12-01

    Full Text Available We analyzed the main drivers for ecological restoration in Iceland from 1907 to 2010 and assessed whether the drivers have changed over time and what factors might explain the changes, if any. Our study was based on a catalogue of 100 restoration projects, programs, and areas, representing 75% to 85% of all restoration activities in Iceland. Catastrophic erosion was an early driver for soil conservation and restoration efforts that still ranked high in the 2000s, reflecting the immense scale of soil erosion and desertification in Iceland. Socioeconomic drivers such as farming and the provision of wood products were strong motivators of ecological restoration over most of the 20th century, although their relative importance decreased with time as the number and diversity of drivers increased. In the 1960s and 1970s, the construction of hard infrastructure, and moral values such as improving the aesthetics of the countryside and "repaying the debt to the land" emerged as motivations for restoration actions. In the late 1990s, the United Nations Climate Change Convention became a driver for restoration, and the importance of nature conservation and recreation increased. Technological development and financial incentives did not show up as drivers of ecological restoration in our study, although there are some indications of their influence. Furthermore, policy was a minor driver, which might reflect weak policy instruments for ecological restoration and some counteractive policies.

  18. Evaluation of Microhardness of Mineral Trioxide Aggregate after Immediate Placement of Different Coronal Restorations: An In Vitro Study

    Maryam Kazemipoor

    2018-02-01

    Full Text Available Objectives: The purpose of this research was to evaluate the effect of immediate placement of different restorative materials in comparison with a temporary restoration on the surface microhardness of mineral trioxide aggregate (MTA.Materials and Methods: Access cavities were prepared in 40 extracted human molars, and a 3-mm layer of MTA was placed in the pulp chamber. The samples were divided into eight groups (n=5. Ten minutes after the MTA placement, two groups were restored with Zonalin temporary restoration, while the other six groups were restored with glass-ionomer cement (GIC, resin-modified glass-ionomer (RMGI, or resin-based composite. In each group, the Vickers microhardness (VMH of MTA was determined after 7 and 21 days. Data were entered into SPSS 17 software program and were analyzed by two-way analysis of variance (ANOVA. The significance level was set at 5%.Results: The type of restorative materials had a statistically significant effect on the microhardness of MTA (P=0.002. However, the microhardness of MTA was neither significantly influenced by the timing of final restoration (P=0.246 nor by the time-material interaction (P=0.116.Conclusions: Based on the results of the present study and by considering the limitations of laboratory studies, it is recommended to postpone the placement of final restorations until the underlying MTA is completely set. Otherwise, in the clinical conditions in which early covering of MTA is recommended, sufficient moist-curing and hydration should be guaranteed by selecting a restorative material with the lowest hydrophilic interaction energy.

  19. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A

    2002-04-01

    The objectives, the programme, and the achievements of SCK-CEN's Site Restoration Department for 2001 are described. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and the management of spent fuel and the flow of dismantled materials and the recycling of materials from decommissioning activities based on the smelting of metallic materials in specialised foundries. The department provides consultancy and services to external organisations and performs R and D on new techniques including processes for the treatment of various waste components including the reprocessing of spent fuel, the treatment of tritium, the treatment of liquid alkali metals into cabonates through oxidation, the treatment of radioactive organic waste and the reconditioning of bituminised waste products.

  20. Bruxism in prospective studies of veneered zirconia restorations-a systematic review.

    Schmitter, Marc; Boemicke, Wolfgang; Stober, Thomas

    2014-01-01

    The objectives of this work were to systematically review the effect of bruxism on the survival of zirconia restorations on teeth and to assess the prevalence of nocturnal masseter muscle activity in a clinical sample. A Medline search was performed independently and in triplicate using the term "zirconia" and activating the filter "clinical trial." Furthermore, three other electronic databases were searched using the same term. Only papers published in English on prospective studies of veneered zirconia frameworks on teeth were included. To estimate the prevalence of sleep bruxism in clinical settings, subjects with no clinical signs of bruxism and who did not report grinding and/or clenching were examined by use of a disposable electromyographic device. The initial search resulted in 107 papers, of which 22 were included in the analysis. Bruxers were excluded in 20 of these articles. In 1 study bruxers were not excluded, and 1 study did not provide information regarding this issue. The methods used to identify bruxers were heterogeneous/not described, and no study used reliable, valid methods. Of 33 subjects without clinical signs of bruxism, nocturnal muscle activity exceeded predefined muscle activity for 63.8% of the subjects. There is a lack of information about the effect of bruxism on the incidence of technical failure of veneered zirconia restorations because all available studies failed to use suitable instruments for diagnosis of bruxism. Nocturnal muscle activity without clinical symptoms/report of bruxism was observed for a relevant number of patients.

  1. Restoration of a coal-mine overburden dump - a case study

    Singh, R.S.; Chaulya, S.K.; Tewary, B.K.; Dhar, B.B. [Central Mining Research Institute, Dhanbad (India)

    1996-03-01

    For the restoration of a coal-mine overburden dump, five tree species viz Delgergia sisoo, Azadirachta indica, Albizia procera, Delonix regia and Acacia nilotica were seeded to evaluate their germination and growth performance. Dalbergia sisoo was found to be the best early successional leguminous plant species showing maximum increase in shoot length and diameter on the mine dump. Therefore, it is recommended that the findings of this study be implemented on mass scale in the dry tropics of India. 10 refs., 6 figs.

  2. Aurora Mine project - historical resources baseline study

    Reeves, B.

    1996-01-01

    This volume contains the results of a base line archaeological study of the Aurora Mine Project local study area. It was compiled in support of Syncrude Canada's application to the Alberta Energy and Utilities Board (AEUB) and Alberta Environmental Protection to construct and operate it new Aurora Mine, located northeast of Fort McMurray, Alberta. The objective of this study was to compile, consolidate, review and analyze the reports for the area compiled over the past 22 years in and adjacent to the local study area (LSA), particularly those of now existing and Syncrude projects, and previously proposed Alsands and OSLO projects. The report is a summary of the human history in the area including pre-contact native archaeological sites, past archaeological studies, the Hinterland site pattern, post-contact native traditional sites, oil sands exploration/development related sites and paleontological sites in the subject area, and areas adjacent to it. 150 refs., 5 tabs., 43 figs

  3. RESTORATION AND SUSTAINABLE VALORIZATION OF CULTURAL HERITAGE AND REGIONAL POLICY IN NORTH-WEST REGION OF ROMANIA. CASE STUDY OF REVITALIZATION OF THE ORADEA FORTRESS

    Anca Dodescu

    2014-12-01

    Full Text Available The paper presents cultural heritage, cultural tourism potential of North-West Region of Romania face to face with restoration and sustainable valorization of cultural heritage as a major domain of intervention of regional policy in Romania. Due to Romanian regionalization form, the Regional Operational Programme (ROP is currently the only programme of regional policy in Romania in 2007-2013. One of the major domains of intervention of ROP 2007-2013 in Romania was restoration and sustainable valorization of cultural heritage. The first paper specific objective is to explore projects contracted until 31.12.2013 in the field of restoration and sustainable valorization of cultural heritage in North-West Region of Romania and their regional development relevance in the context of existing regional development strategies. The second paper specific objective is to present a model of restoration of cultural heritage in a sustainable way throughout the case study of Revitalization of the Oradea Fortress in order to introduce it in the tourism circuit - that could become an example for other cultural sites around the region and a succes story in the field of cultural tourism based of ROP 2007-2013 experience. Exploring rich cultural heritage of the North-West Region face to face with poor condition of cultural heritage sites and investments required in order to introduce them in touristic circuit, the paper concludes that all contracted projects are relevant for sustainable valorization of regional cultural heritage and cultural tourism potential in the context of existing regional development strategies, but they contributed only partially to regional specific needs. Also, the paper concludes that number of ROP 2007-2013 projects implemented in the field of cultural heritage is surprisingly small, area of interest of these projects is rather narrow and analyzes the most important causes for these gaps. Based on the case study presented, the paper

  4. Ecological Restoration: Guidance from Theory

    Joy Zedler

    2005-09-01

    Full Text Available A review of the science and practice of ecosystem restoration led me to identify key ecological theories and concepts that are relevant to planning, implementing, and sustaining restoration efforts. From experience with actual restoration projects, I provide guidance for improving the restoration process. Despite an abundance of theory and guidance, restoration goals are not always achieved, and pathways toward targets are not highly predictable. This is understandable, since each restoration project has many constraints and unique challenges. To improve restoration progress, I advise that sites be designed as experiments to allow learning while doing. At least the larger projects can be restored in phases, each designed as experimental treatments to test alternative restoration approaches. Subsequent phases can then adopt one or more of the treatments that best achieved goals in earlier phases while applying new tests of other restoration measures. Both science and restoration can progress simultaneously. This phased, experimental approach (called “adaptive restoration” is an effective tool for improving restoration when monitoring, assessment, interpretation and research are integrated into the process.

  5. An archaeological reconnaissance of a 14 mile section of the East Fork Poplar Creek for the Environmental Restoration Project, Anderson and Roane Counties, Tennessee

    DuVall, G.D.

    1993-01-01

    At the request of the US Army Corps of Engineers, Nashville District, Nashville, Tennessee, an archaeological reconnaissance of the potential impact areas of the Environmental Restoration Project (ERP) along the East Fork Poplar Creek was conducted during the period December 16, 1991, and March 3, 1992. The reconnaissance was conducted in response to environmental evaluations as a result of the accidental spillage of approximately 293,000 pounds of mercury, radionuclides, heavy metals and other compounds. The reconnaissance to assess adverse impacts to cultural resources located within the boundaries of Federally-licensed, permitted, funded or assisted projects was conducted in compliance with the National Historic Preservation Act of 1966, National Environmental Policy Act of 1969 and Executive Order 11593

  6. Does river restoration affect diurnal and seasonal changes to surface water quality? A study along the Thur River, Switzerland

    Chittoor Viswanathan, Vidhya [Eawag, Swiss Federal Institute of Aquatic Science and Technology, Department of Water Resources and Drinking Water, Überlandstrasse 133, 8600 Dübendorf (Switzerland); Université de Neuchâtel, Centre d' Hydrogéologie et de Géothermie (CHYN), Rue Emile-Argand 11, CH-2000 Neuchâtel (Switzerland); Molson, John [Université Laval, Département de Géologie et Génie Géologique, Québec City, Québec (Canada); Schirmer, Mario [Eawag, Swiss Federal Institute of Aquatic Science and Technology, Department of Water Resources and Drinking Water, Überlandstrasse 133, 8600 Dübendorf (Switzerland); Université de Neuchâtel, Centre d' Hydrogéologie et de Géothermie (CHYN), Rue Emile-Argand 11, CH-2000 Neuchâtel (Switzerland)

    2015-11-01

    Changes in river water quality were investigated along the lower reach of the Thur River, Switzerland, following river restoration and a summer storm event. River restoration and hydrological storm events can each cause dramatic changes to water quality by affecting various bio-geochemical processes in the river, but have to date not been well documented, especially in combination. Evaluating the success of river restoration is often restricted in large catchments due to a lack of high frequency water quality data, which are needed for process understanding. These challenges were addressed in this study by measuring water quality parameters including dissolved oxygen (DO), temperature, pH, electrical conductivity (EC), nitrate and dissolved organic carbon (DOC) with a high temporal frequency (15 min–1 h) over selected time scales. In addition, the stable isotopes of water (δD and δ{sup 18}O-H{sub 2}O) as well as those of nitrate (δ{sup 15}N-NO{sub 3}{sup −} and δ{sup 18}O-NO{sub 3}{sup −}) were measured to follow changes in water quality in response to the hydrological changes in the river. To compare the spatial distribution of pre- and post-restoration water quality, the sampling stations were chosen upstream and downstream of the restored section. The diurnal and seasonal changes were monitored by conducting 24-hour campaigns in three seasons (winter, summer and autumn) in 2012 and 2013. The amplitude of the diurnal changes of the various observed parameters showed significant seasonal and spatial variability. Biological processes — mainly photosynthesis and respiration — were found to be the major drivers of these diurnal cycles. During low flow in autumn, a reduction of nitrate (attributed to assimilation by autotrophs) in the pre-dawn period and a production of DOC during the daytime (attributed to photosynthesis) were observed downstream of the restored site. Further, a summer storm event was found to override the influence of these biological

  7. Does river restoration affect diurnal and seasonal changes to surface water quality? A study along the Thur River, Switzerland

    Chittoor Viswanathan, Vidhya; Molson, John; Schirmer, Mario

    2015-01-01

    Changes in river water quality were investigated along the lower reach of the Thur River, Switzerland, following river restoration and a summer storm event. River restoration and hydrological storm events can each cause dramatic changes to water quality by affecting various bio-geochemical processes in the river, but have to date not been well documented, especially in combination. Evaluating the success of river restoration is often restricted in large catchments due to a lack of high frequency water quality data, which are needed for process understanding. These challenges were addressed in this study by measuring water quality parameters including dissolved oxygen (DO), temperature, pH, electrical conductivity (EC), nitrate and dissolved organic carbon (DOC) with a high temporal frequency (15 min–1 h) over selected time scales. In addition, the stable isotopes of water (δD and δ 18 O-H 2 O) as well as those of nitrate (δ 15 N-NO 3 − and δ 18 O-NO 3 − ) were measured to follow changes in water quality in response to the hydrological changes in the river. To compare the spatial distribution of pre- and post-restoration water quality, the sampling stations were chosen upstream and downstream of the restored section. The diurnal and seasonal changes were monitored by conducting 24-hour campaigns in three seasons (winter, summer and autumn) in 2012 and 2013. The amplitude of the diurnal changes of the various observed parameters showed significant seasonal and spatial variability. Biological processes — mainly photosynthesis and respiration — were found to be the major drivers of these diurnal cycles. During low flow in autumn, a reduction of nitrate (attributed to assimilation by autotrophs) in the pre-dawn period and a production of DOC during the daytime (attributed to photosynthesis) were observed downstream of the restored site. Further, a summer storm event was found to override the influence of these biological processes that control the diurnal

  8. Rethinking Partnerships with the Aim of Producing Knowledge with Practical Relevance: a Case Study in the Field of Ecological Restoration

    Héloïse Gonzalo-Turpin

    2008-12-01

    Full Text Available Researchers in conservation biology and restoration ecology often work in partnership with local actors to increase the practical relevance of the knowledge they produce. Although an academic mode of knowledge production is essential in research for a better understanding of biological systems, it often fails to produce frameworks and methodologies having practical relevance that can be used in conservation and restoration programs. The involvement of researchers in collective plans of action is supposed to contribute to the production of a more contextualized form of knowledge. In this paper, we report our experience of partnership research in an ecological restoration project. We show that changing our mode of knowledge production to one that produces knowledge having more practical relevance requires a particular spectrum of partners and reflexive communication between all the partners. We advocate the need for participatory approaches that favor collective and reflexive processes of problem finding and problem solving in conservation and restoration projects. Putting such processes into practice is not only a challenge for researchers but also for their partners, and presupposes a profound transformation of their roles.

  9. Health-Related Quality of Life after Restorative Proctocolectomy: A Cross-Sectional Study.

    Helavirta, I; Hyöty, M; Oksanen, P; Huhtala, H; Haapamäki, J; Aitola, P

    2018-05-01

    Patients undergoing restorative proctocolectomy have often suffered from active ulcerative colitis which should be remembered when assessing quality of life after operation. The aim of this study was to explore health-related quality of life after restorative proctocolectomy in those with poor or good pouch function and to compare that to patients with active or inactive ulcerative colitis and to the general population. Altogether, 282 restorative proctocolectomy patients were investigated. The control group comprised 408 ulcerative colitis patients from the local register. Generic 15D and disease-specific inflammatory bowel disease questionnaire health-related quality of life instruments were used. Population-based data were available for 15D. Pouch function was evaluated with Öresland score and colitis activity with simple clinical colitis activity index. 15D results showed that patients with good pouch function had health-related quality of life similar to that of the general population. Health-related quality of life with inflammatory bowel disease questionnaire was equally good in patients with good pouch function (n = 131; 70%) and inactive colitis (n = 95; 63%), and equally impaired in patients with poor pouch function (n = 56; 30%) and active colitis (n = 18; 12%). The majority of patients had health-related quality of life comparable to that in general population. Most patients with active ulcerative colitis are likely to improve their health-related quality of life after successful surgery. These findings are important when informing colitis patients about life after surgery.

  10. Benefits of investing in ecosystem restoration

    Groot, de R.S.; Blignaut, J.; Ploeg, van der S.; Aronson, J.; Elmqvist, T.; Farley, J.

    2013-01-01

    Measures aimed at conservation or restoration of ecosystems are often seen as net-cost projects by governments and businesses because they are based on incomplete and often faulty cost-benefit analyses. After screening over 200 studies, we examined the costs (94 studies) and benefits (225 studies)

  11. Halifax Lateral Pipeline Project : comprehensive study report

    1998-12-01

    The National Energy Board has requested the preparation of a comprehensive study report (CSR) for the proposed Halifax Lateral Pipeline Project in support of Maritimes and Northeast Pipeline Company's proposal to construct the lateral pipeline to transport natural gas produced in offshore Nova Scotia to the Tufts Cove electric generating station in the Halifax Regional Municipality. The project will also enhance the access of natural gas to potential markets located along the pipeline route. This CSR was prepared according to guidelines of the Canadian Environmental Assessment Agency. The report presents: (1) an overview of the project, (2) a summary of the regulatory requirements for assessment, (3) a description of the environmental assessment and regulatory process to date, (4) a summary of the predicted residual environmental and socio-economic effects associated with the project, and (5) a summary of the public consultation process. The environmental and socio-economic assessment focused on these eleven issues: groundwater resources, surface water resources, wetlands, soils, air quality, fish habitat, rare herpetiles, mammals, avifauna, rare plants and archaeological heritage resources. The report identified potential interactions between the project and valued socio-economic and environmental components. These were addressed in combination with recommended mitigative measures to reduce potential adverse effects. It was concluded that the overall environmental effects from the proposed project are likely to be minimal and can be effectively managed with good environmental management methods. 14 refs., 5 tabs., 5 figs., 2 appendices

  12. Methodology for ranking restoration options

    Hedemann Jensen, Per

    1999-04-01

    The work described in this report has been performed as a part of the RESTRAT Project FI4P-CT95-0021a (PL 950128) co-funded by the Nuclear Fission Safety Programme of the European Commission. The RESTRAT project has the overall objective of developing generic methodologies for ranking restoration techniques as a function of contamination and site characteristics. The project includes analyses of existing remediation methodologies and contaminated sites, and is structured in the following steps: characterisation of relevant contaminated sites; identification and characterisation of relevant restoration techniques; assessment of the radiological impact; development and application of a selection methodology for restoration options; formulation of generic conclusions and development of a manual. The project is intended to apply to situations in which sites with nuclear installations have been contaminated with radioactive materials as a result of the operation of these installations. The areas considered for remedial measures include contaminated land areas, rivers and sediments in rivers, lakes, and sea areas. Five contaminated European sites have been studied. Various remedial measures have been envisaged with respect to the optimisation of the protection of the populations being exposed to the radionuclides at the sites. Cost-benefit analysis and multi-attribute utility analysis have been applied for optimisation. Health, economic and social attributes have been included and weighting factors for the different attributes have been determined by the use of scaling constants. (au)

  13. Er:YAG Laser and Fractured Incisor Restorations: An In Vitro Study

    C. Fornaini

    2012-01-01

    Full Text Available Introduction. The aim of this study was to analyse the effects of an Er:YAG laser on enamel and dentine in cases of dental restorations involving fractured teeth, utilizing the dental fragment. Materials and Methods. Seventy-two freshly extracted bovine incisors were fractured at the coronal level by using a hammer applied with a standardized method, and the fragment was reattached by using three different methods: Er:YAG laser, orthophosphoric acid, and laser plus acid. The different groups were evaluated by a test realized with the dynamometer to know the force required to successfully detach the reattached fragment and by a microinfiltration test by using a 0.5% methylene blue solution followed by the optic microscope observation. Results. The compression test showed only a slight difference between the three groups, without any statistical significance. The infiltration test used to evaluate the marginal seal between the fracture fragment and the tooth demonstrated that etching with Er:YAG laser alone or in combination with orthophosphoric acid gives better results than orthophosphoric acid alone, with a highly significant statistical result. Discussion. Reattaching a tooth fragment represents a clinically proven methodology, in terms of achieving resistance to detachment, and the aim of this work was to demonstrate the advantages of Er:YAG laser on this procedure. Conclusion. This “in vitro” study confirms that Er:YAG laser can be employed in dental traumatology to restore frontal teeth after coronal fracture.

  14. Challenges of ecological restoration

    Halme, Panu; Allen, Katherine A.; Aunins, Ainars

    2013-01-01

    we introduce northern forests as an ecosystem, discuss the historical and recent human impact and provide a brief status report on the ecological restoration projects and research already conducted there. Based on this discussion, we argue that before any restoration actions commence, the ecology......The alarming rate of ecosystem degradation has raised the need for ecological restoration throughout different biomes and continents. North European forests may appear as one of the least vulnerable ecosystems from a global perspective, since forest cover is not rapidly decreasing and many...... on Biological Diversity. Several northern countries are now taking up this challenge by restoring forest biodiversity with increasing intensity. The ecology and biodiversity of boreal forests are relatively well understood making them a good model for restoration activities in many other forest ecosystems. Here...

  15. Ecological impact study methodology for hydrotechnical projects

    Manoliu, Mihai; Toculescu, Razvan

    1993-01-01

    Besides the expected benefits, hydrotechnical projects may entail unfavorable effects on the hydrological regime, environment, health and living conditions of the population. Rational water resource management should take into consideration both the favorable and unfavorable effects. This implies the assessment of socio-economic and environmental impacts of the changes of the hydrological regime. The paper proposes a methodology for carrying out impact studies of hydrotechnical projects. The results of the work are presented graphically on the basis of composite programing. A summary of mathematical methods involved in impact study design is also presented. (authors)

  16. Benefits of investing in ecosystem restoration.

    DE Groot, Rudolf S; Blignaut, James; VAN DER Ploeg, Sander; Aronson, James; Elmqvist, Thomas; Farley, Joshua

    2013-12-01

    Measures aimed at conservation or restoration of ecosystems are often seen as net-cost projects by governments and businesses because they are based on incomplete and often faulty cost-benefit analyses. After screening over 200 studies, we examined the costs (94 studies) and benefits (225 studies) of ecosystem restoration projects that had sufficient reliable data in 9 different biomes ranging from coral reefs to tropical forests. Costs included capital investment and maintenance of the restoration project, and benefits were based on the monetary value of the total bundle of ecosystem services provided by the restored ecosystem. Assuming restoration is always imperfect and benefits attain only 75% of the maximum value of the reference systems over 20 years, we calculated the net present value at the social discount rates of 2% and 8%. We also conducted 2 threshold cum sensitivity analyses. Benefit-cost ratios ranged from about 0.05:1 (coral reefs and coastal systems, worst-case scenario) to as much as 35:1 (grasslands, best-case scenario). Our results provide only partial estimates of benefits at one point in time and reflect the lower limit of the welfare benefits of ecosystem restoration because both scarcity of and demand for ecosystem services is increasing and new benefits of natural ecosystems and biological diversity are being discovered. Nonetheless, when accounting for even the incomplete range of known benefits through the use of static estimates that fail to capture rising values, the majority of the restoration projects we analyzed provided net benefits and should be considered not only as profitable but also as high-yielding investments. Beneficios de Invertir en la Restauración de Ecosistemas. © 2013 Society for Conservation Biology.

  17. Assessment and restoring soil functionality in degraded areas of organic vineyards. The preliminary results of the ReSolVe project in Italy

    Priori, Simone; Agnelli, Alessandro; Castaldini, Maurizio; D'Avino, Lorenzo; D'Errico, Giada; Gagnarli, Elena; Giudi, Silvia; Goggioli, Donatella; Lagomarsino, Alessandra; Landi, Silvia; Leprini, Marco; Pellegrini, Sergio; Perria, Rita; Puccioni, Sergio; Simoni, Sauro; Storchi, Paolo; Valboa, Giuseppe; Zombardo, Alessandra; Costantini, Edoardo

    2016-04-01

    In both conventional and organic Italian vineyards, it is quite common to have areas characterized by problems in vine health, grape production and quality, often caused by improper land preparation before vine plantation and/or management. Causes for soil malfunctioning can include: reduced contribution of the soil fauna to the ecosystem services (i.e. nutrient cycles), poor organic matter content, imbalance of some element ratio, altered pH, water deficiency, soil compaction and/or scarce oxygenation. ReSolVe is a transnational and interdisciplinary 3-years research project aimed at testing the effects of selected organic strategies for restoring optimal soil functionality in degraded areas within vineyard. The different restoring strategies implemented in each plot will be: i) compost produced on farm by manure + pruning residue + grass, ii) faba bean and barley green manure, iii) sowing and dry mulching with Trifolium squarrosum L. During two years of such treatments, the trend of the soil features and the grapevine status will be monitored in detail, to reveal the positive and negative effects of such treatments. The project involves 8 research groups in 6 different EU countries (Italy, France, Spain, Sweden, Slovenia, and Turkey), with experts from several disciplines, including soil science, ecology, microbiology, grapevine physiology, viticulture, and biometry. The experimental vineyards are situated in Italy (Chianti hills and Maremma plain, Tuscany), France (Bordeaux and Languedoc), Spain (La Rioja) and Slovenia (Primorska) for winegrape, and in Turkey (Adana and Mersin) for table grape. Soil features before implementing restoring strategies showed lower content of soil organic matter and enzyme activities, and higher carbonates in degraded areas than in the non-degraded areas. The Biological Soil Quality values of microarthropods were always high, in comparison with data registered in similarly managed vineyards or stable ecosystems, and the data showed

  18. Supplement analysis for the proposed upgrades to the tank farm ventilation, instrumentation, and electrical systems under Project W-314 in support of tank farm restoration and safe operations

    1997-05-01

    The mission of the TWRS program is to store, treat, and immobilize highly radioactive tank waste in an environmentally sound, safe, and cost-effective manner. Within this program, Project W-314, Tank Farm Restoration and Safe Operations, has been established to provide upgrades in the areas of instrumentation and control, tank ventilation, waste transfer, and electrical distribution for existing tank farm facilities. Requirements for tank farm infrastructure upgrades to support safe storage were being developed under Project W-314 at the same time that the TWRS EIS alternative analysis was being performed. Project W-314 provides essential tank farm infrastructure upgrades to support continued safe storage of existing tank wastes until the wastes can be retrieved and disposed of through follow-on TWRS program efforts. Section4.0 provides a description of actions associated with Project W-314. The TWRS EIS analyzes the environmental consequences form the entire TWRS program, including actions similar to those described for Project W-314 as a part of continued tank farm operations. The TWRS EIS preferred alternative was developed to a conceptual level of detail to assess bounding impact areas. For this Supplement Analysis, in each of the potential impact areas for Project W-314, the proposed action was evaluated and compared to the TWRS EIS evaluation of the preferred alternative (Section 5.0). Qualitative and/or quantitative comparisons are then provided in this Supplement Analysis to support a determination on the need for additional National Environmental Policy Act (NEPA) analysis. Based on this Supplement Analysis, the potential impacts for Project W-314 would be small in comparison to and are bounded by the impacts assessed for the TWRS EIS preferred alternative, and therefore no additional NEPA analysis is required (Section 7.0)

  19. Immediate restoration of single tapered implants with nonoccluding provisional crowns: a 5-year clinical prospective study.

    Lang, Lisa A; Turkyilmaz, Ilser; Edgin, Wendell A; Verrett, Ronald; Garcia, Lily T

    2014-04-01

    Dental literature has limited number of publications regarding long-term outcome data of immediate restoration of single missing teeth with an implant-supported provisional crown. This 5-year study evaluated hard and soft tissue responses to the immediate placement of single implant-supported provisional crowns. Twenty patients received one dental implant restored immediately with a provisional acrylic resin screw-retained crown. Crestal bone loss was evaluated from standardized periapical radiographs collected at 3-month intervals for the first 21 months followed by a 5-year evaluation. Historical controls acquired from available dental literature were used for comparison. One implant failed within 2 months of surgical placement, presenting with pain and mobility. The remaining implants demonstrated no infection, pain, or radiolucencies. Nineteen implants were clinically immobile, osseointegrated, and asymptomatic at 21 months. At 5 years, one patient died, three patients were noncompliant, and 15 implants were evaluated as functional. Mean bone loss (MBL) at 1 year and 21 months was approximately 0.5 ± 0.5 mm and 0.70 ± 0.26 mm at 5 years. There was no statistically significant difference between MBLs at p provisionalization of single dental implants compares favorably with conventional loading protocols. Long-term data suggest that immediate provisionalization of single dental implants is a viable treatment option. © 2012 Wiley Periodicals, Inc.

  20. NCSS Peace Studies Project: An Interim Report.

    Ferber, Michael

    This preliminary report of a National Council for the Social Studies (NCSS) project briefly assesses teaching materials related to peace and nuclear warfare. Covering elementary, secondary, and higher education, the materials discussed present a variety of activities, decision-making approaches, and analytical assessments of policies of many…

  1. Reef and Shore. Hawaii Nature Study Project.

    Hawaii Univ., Honolulu. Curriculum Research and Development Group.

    This teaching guide is one of a series developed by the Curriculum Research and Development Group at the University of Hawaii. The program is laboratory and field oriented for elementary students. The focus of study for the project is the plant and animal life and the physical components of the Hawaiian environment, and their ecological…

  2. a Restoration Oriented Hbim System for Cultural Heritage Documentation: the Case Study of Parma Cathedral

    Bruno, N.; Roncella, R.

    2018-05-01

    The need to safeguard and preserve Cultural Heritage (CH) is increasing and especially in Italy, where the amount of historical buildings is considerable, having efficient and standardized processes of CH management and conservation becomes strategic. At the time being, there are no tools capable of fulfilling all the specific functions required by Cultural Heritage documentation and, due to the complexity of historical assets, there are no solution as flexible and customizable as CH specific needs require. Nevertheless, BIM methodology can represent the most effective solution, on condition that proper methodologies, tools and functions are made available. The paper describes an ongoing research on the implementation of a Historical BIM system for the Parma cathedral, aimed at the maintenance, conservation and restoration. Its main goal was to give a concrete answer to the lack of specific tools required by Cultural Heritage documentation: organized and coordinated storage and management of historical data, easy analysis and query, time management, 3D modelling of irregular shapes, flexibility, user-friendliness, etc. The paper will describe the project and the implemented methodology, focusing mainly on survey and modelling phases. In describing the methodology, critical issues about the creation of a HBIM will be highlighted, trying to outline a workflow applicable also in other similar contexts.

  3. PERIPHERAL APPLICATION OF REPETITIVE PULSE MAGNETIC STIMULATION ON JOINT CONTRACTURE FOR MOBILITY RESTORATION: CONTROLLED RANDOMIZED STUDY

    Efthimios J. Kouloulas

    2016-10-01

    Full Text Available Background: Joint contracture is a limitation in the passive or active range of motion (ROM of a joint, where in addition to the mobility limiting factor the pain is also present. Repetitive pulsed Magnetic Stimulation (rPMS appears to be an effective, non-invasive and safety solution for treating this condition. Therefore aim of this study was to evaluate the effect of rPMS in treating joint contracture. Methods: 30 subjects with joint contracture in the knee were enrolled in this study and divided respectively into Treatment and Control group. The treatment group were delivered with rPMS therapy. The control group was delivered with conventional physiotherapy method (ultrasound. The primary outcome measurements were: 1. Mobility evaluation by goniometry (ROM in degrees while performing flexion and Patient Functional Assessment Questionnaire (PFAQ for ability to perform Activities of Daily Living (ADL and 2. Pain evaluation by 10-point Visual Analog Scale (VAS for pain perception. Absence of adverse events was set as a secondary measure. Results: The results of the study show statistical difference (p<0.05 between the levels of improvement of all studied parameters while comparing between both groups. The results suggest greater immobility restoration and pain relieving effect of the rPMS in comparison to conventional physiotherapy method. Conclusion: rPMS an effective and safe non-invasive method for mobility restoration and pain relief in case of joint contractures. This study suggests the method as beneficial and quality of life ameliorating among patients suffering from immobilized joints accompanied by pain.

  4. A synopsis of short-term response to alternative restoration treatments in sagebrush-steppe: the SageSTEP project

    McIver, James; Brunson, Mark; Bunting, Steve; Chambers, Jeanne; Doescher, Paul; Grace, James; Hulet, April; Johnson, Dale; Knick, Steven T.; Miller, Richard; Pellant, Mike; Pierson, Fred; Pyke, David; Rau, Benjamin; Rollins, Kim; Roundy, Bruce; Schupp, Eugene; Tausch, Robin; Williams, Jason

    2014-01-01

    The Sagebrush Steppe Treatment Evaluation Project (SageSTEP) is an integrated long-term study that evaluates ecological effects of alternative treatments designed to reduce woody fuels and to stimulate the herbaceous understory of sagebrush steppe communities of the Intermountain West. This synopsis summarizes results through 3 yr posttreatment. Woody vegetation reduction by prescribed fire, mechanical treatments, or herbicides initiated a cascade of effects, beginning with increased availability of nitrogen and soil water, followed by increased growth of herbaceous vegetation. Response of butterflies and magnitudes of runoff and erosion closely followed herbaceous vegetation recovery. Effects on shrubs, biological soil crust, tree cover, surface woody fuel loads, and sagebrush-obligate bird communities will take longer to be fully expressed. In the short term, cool wet sites were more resilient than warm dry sites, and resistance was mostly dependent on pretreatment herbaceous cover. At least 10 yr of posttreatment time will likely be necessary to determine outcomes for most sites. Mechanical treatments did not serve as surrogates for prescribed fire in how each influenced the fuel bed, the soil, erosion, and sage-obligate bird communities. Woody vegetation reduction by any means resulted in increased availability of soil water, higher herbaceous cover, and greater butterfly numbers. We identified several trade-offs (desirable outcomes for some variables, undesirable for others), involving most components of the study system. Trade-offs are inevitable when managing complex natural systems, and they underline the importance of asking questions about the whole system when developing management objectives. Substantial spatial and temporal heterogeneity in sagebrush steppe ecosystems emphasizes the point that there will rarely be a “recipe” for choosing management actions on any specific area. Use of a consistent evaluation process linked to monitoring may be the

  5. Monitoring habitat restoration projects: U.S. Fish and Wildlife Service Pacific Region Partners for Fish and Wildlife Program and Coastal Program Protocol

    Woodward, Andrea; Hollar, Kathy

    2011-01-01

    Refuges, Contribute to the implementation of the State Comprehensive Wildlife Conservation Strategies, and Help achieve the objectives of the National Fish Habitat Partnerships and regionally based bird conservation plans (for example, North American Waterfowl Management Plan, U.S. Pacific Island Shorebird Conservation Plans, Intermountain West Regional Shorebird Plan, etc.). The Partners Program accomplishes these priorities by: Developing and maintaining strong partnerships, and delivering on-the-ground habitat restoration projects designed to reestablish habitat function and restore natural processes; Addressing key habitat limiting factors for declining species; Providing corridors for wildlife and decrease impediments to native fish and wildlife migration; and Enhancing native plant communities by reducing invasive species and improving native species composition. The Coastal Program is a voluntary fish and wildlife conservation program that focuses on watershed-scale, long-term collaborative resource planning and on-the-ground restoration projects in high-priority coastal areas. The Coastal Program conducts planning and restoration work on private, State, and Federal lands, and partnerships with other agencies-Native American Tribes, citizens, and organizations are emphasized. Coastal Program goals include restoring and protecting coastal habitat, providing technical and cost-sharing assistance where appropriate, supporting community-based restoration, collecting and developing information on the status of and threats to fish and wildlife, and using outreach to promote stewardship of coastal resources. The diversity of habitats and partners in Region 1 present many opportunities for conducting restoration projects. Faced with this abundance of opportunity, the Partners Program and Coastal Program must ensure that limited staffing and project dollars are allocated to benefit the highest priority resources and achieve the highest quality results for Federal trust

  6. Comparative study of nanomechanical properties of cements used in teeth restoration

    Peluccio, M S; Bignardi, C; Lombardo, S; Montevecchi, F M; Carossa, S

    2007-01-01

    The discipline of dental science includes the diagnosis of disease in the mouth and teeth, its manifestations and the procedures involved in the restoration of their integrity and function. Restoration of lost tooth structure with suitable materials plays an integral part in the successful rehabilitation of oral tissues. Several factors influence the performance of dental restorations. These factors include the type of cement used to bond crown restoration to prepared teeth. The nanoindentation method was used to explore the mechanical properties of different types of resin cement polymerized using different techniques. A Nano Indenter XP (from MTS Nano Instruments, USA) was used for the experimental tests. A sample of 40 extracted human teeth were restored using two different resin cements: Variolink II (Ivoclar Vivadent, Liechtenstein) and Venus A2 (Heraeus Kulzer, Germany). Both resin cements are light-cured and one of them is self-cured so that the degree of polymerization would be higher. The data obtained for nanohardness and the Young's modulus were analysed using ANOVA to evaluate the influence of different factors (the resin cement and polymerization technique used, the position on the tooth-restoration interface) and to determine the best performance for restoration. The results obtained could give a useful indication of the choice of cementation technique and of the materials used for the restoration of lost tooth structure in different clinical cases

  7. A Phenomenological Study of the Experience of Respondents in Campus-Based Restorative Justice Programs

    Meagher, Peter J.

    2009-01-01

    The focus of this dissertation was the use of restorative justice practices in the collegiate setting. Some have expressed concern with the legal nature of campus conduct processes. Restorative practices have been implemented in criminal justice and K-12 settings and are seen by some as an antidote to overly legalistic campus conduct processes.…

  8. Steps Towards Sustainability and Tools for Restoring Natural Capital: Etang de Berre (southern France) case study

    Aronson, J.; Claeys, F.; Westerberg, V.; Picon, P.; Bernard, G.; Bocognano, J.M.; Groot, de R.S.

    2011-01-01

    Communities, nations, not-for-pro fi t groups, and some mining, infrastructure, and energy corporations are catching on to the fact that the ecological restoration of degraded ecosystems is vital to their search for sustainability and ecological accountability. The science of restoration ecology can

  9. Diverse Approaches to Implement and Monitor River Restoration: A Comparative Perspective in France and Germany

    Morandi, Bertrand; Kail, Jochem; Toedter, Anne; Wolter, Christian; Piégay, Hervé

    2017-11-01

    River restoration is a main emphasis of river management in European countries. Cross-national comparisons of its implementation are still rare in scientific literature. Based on French and German national censuses, this study compares river restoration practices and monitoring by analysing 102 French and 270 German projects. This comparison aims to draw a spatial and temporal framework of restoration practices in both countries to identify potential drivers of cross-national similarities and differences. The results underline four major trends: (1) a lag of almost 15 years in river restoration implementation between France and Germany, with a consequently higher share of projects in Germany than in France, (2) substantial similarities in restored reach characteristics, short reach length, small rivers, and in "agricultural" areas, (3) good correspondences between stressors identified and restoration measures implemented. Morphological alterations were the most important highlighted stressors. River morphology enhancement, especially instream enhancements, were the most frequently implemented restoration measures. Some differences exist in specific restoration practices, as river continuity restoration were most frequently implemented in French projects, while large wood introduction or channel re-braiding were most frequently implemented in German projects, and (4) some quantitative and qualitative differences in monitoring practices and a significant lack of project monitoring, especially in Germany compared to France. These similarities and differences between Germany and France in restoration application and monitoring possibly result from a complex set of drivers that might be difficult to untangle (e.g., environmental, technical, political, cultural).

  10. Study on the forest vegetation restoration monitoring using HJ-1A hyperspectral data

    Chuan, Zhang; Fawang, Ye; Hongcheng, Liu; Haixia, He

    2014-01-01

    In this paper, Xunke County was studied using HJ-1A hyperspectral data for monitoring vegetation restoration after forest fires. The pre-processing procedure including data format conversion, image mosaicing and atmospheric correction. Support vector machine classification was used to perform surface feature identification based on the extracted spectral end-members. On that basis, the image area was divided into seven categories and statistical analysis of classification types was performed. The results showed that HJ-1A hyperspectral data had great potential in fine classification of surface features and the accuracy of classification was 91.8%. The mild and severe fire-affected area extraction provided useful reference for disaster recovery monitoring. Furthermore, the distinction between coniferous forest and broadleaved forest can offer useful information for forest fire prevention and early warning to some extent

  11. Environmental restoration of uranium contaminated sites in Estonia within the framework of IAEA project (RER/9/022) in 1995-1996

    Ratas, R.

    1997-01-01

    In Estonia there are several radioactively contaminated sites left from the military and uranium progressing activities by the former Soviet Union. Enhanced radiation levels are prevalent in the Paldiski area, a former nuclear submarine training centre; on the territory of the waste depository at Saku/Tammiku and at Sillamae, where a large depository of uranium milling tailings is situated. During the last two years considerable effort has been put into restoration of these sites. To start with, designing of reasonably achievable remediation projects have been taken up. Estonia has received large contributions from many western countries and organisations. Practical remediation work on contaminated areas, e.g. at Sillamae is, however, delayed due to lack of funds. (author)

  12. Stable Isotope Signatures of Carbon and Nitrogen to Characterize Exchange Processes and Their Use for Restoration Projects along the Austrian Danube

    Hein, T. [Wasser Cluster Lunz, Lunz-See and Institute of Hydrobiology and Aquatic Ecosystem Management, University for Natural Resources and Life Sciences, Vienna, (Austria); Bondar-Kunze, E. [University of Natural Resources and Applied Life Sciences, Vienna (Austria); Welti, N. [Institute of Hydrobiology and Aquatic Ecosystem Management, Vienna (Austria)

    2013-05-15

    The size and composition of an organic matter pool and its sources is a fundamental ecosystem property of river networks. River ecosystems are known to receive large amounts of terrestrial organic matter from catchments, still the question is to what extent aquatic sources influence riverine food webs or at least some components of these food webs. To identify different sources and their potential biological availability at the ecosystem level, we propose using stable isotope signatures of carbon and nitrogen and their respective elemental ratios. In this study, we used these parameters to evaluate river restoration measures. The target of the restoration was to improve surface connectivity between the main channel of the Danube downstream from Vienna and a side arm system within a floodplain. Analyses of the natural abundance of stable isotopes revealed that the restored side arm system showed distinct differences in the particulate organic matter pool in relation to hydrological connectivity. At low water levels, aquatic sources dominate in the side arm system, while at high water levels riverine organic matter is the dominating source. At medium connectivity levels aquatic sources also prevail in the side arm, thus an export of bio-available organic matter into the main channel can be expected. Based on these measurements, the increased - but hydrologically controlled - phytoplankton production was assessed and through this information, changes in ecosystem function were evaluated. (author)

  13. European Wind Farm Project Costs History and Projections 2008 Study

    2008-10-15

    At the request of Enova (the 'Client'), Garrad Hassan and Partners Limited ('GH') has provided technical advice on capital cost expectations for wind farm developments. In summary, the work provides a survey of the present and future 5-year prognosis for costs and conditions facing developers and suppliers in the European wind power market. The report will be used as a benchmark to support tendering for future Norwegian projects. As such, it will also provide discussion of how project characteristics can influence project cost. Data Used in the Analysis GH has obtained data on the investment costs for 35 projects developed or in development in Europe. The projects represent to the extent possible the characteristics representative of potential Norwegian projects. The data used in this analysis are from actual projects in: France, Germany, Hungary, Ireland, Italy, Northern Ireland, Portugal, Scotland, Spain and Wales. The turbine capacities represented in the data are typically 2 MW or above, except in one case where a mix of turbines sizes was used at the project. GH highlights that because of high demand for turbines, the main manufacturers have recently been offering to meet delivery schedules for new orders from late 2010. For new tenders it is likely that delivery time frames offered will now be for 2011 deliveries. As a result of the current 'Seller's Market', production capacity typically relates directly to the number of turbines sold in the year; therefore for 2007 the annual production capacity was approximately 22 GW. GH is aware that turbine suppliers across the market are working to increase their production capacity in order to ease the pressure on the market, however, there are bottlenecks through the supply chain at the sub component level. As a result, increases in production capacity will likely remain at a relatively steady state in the short term. Energy Assessment The energy assessment of a project is the area

  14. Study of sticky rice-lime mortar technology for the restoration of historical masonry construction.

    Yang, Fuwei; Zhang, Bingjian; Ma, Qinglin

    2010-06-15

    mortar is a special organic-inorganic composite material. The inorganic component is calcium carbonate, and the organic component is amylopectin, which is presumably derived from the sticky rice soup added to the mortar. A systematic study of sticky rice-lime mortar technology was conducted to help determine the proper courses of action in restoring ancient buildings. Lime mortars with varying sticky rice content were prepared and tested. The physical properties, mechanical strength, and compatibility of lime mortar were found to be significantly improved by the introduction of sticky rice, suggesting that sticky rice-lime mortar is a suitable material for repairing mortar in ancient masonry. Moreover, the amylopectin in the lime mortar was found to act as an inhibitor; the growth of the calcium carbonate crystals is controlled by its presence, and a compact structure results, which may explain the enhanced performance of this organic-inorganic composite compared to single-component lime mortar.

  15. Project CAPTURE: a U.S. national prioritization assessment of tree species for conservation, management, and restoration

    Kevin M. Potter; Barbara S. Crane; Valerie D. Hipkins

    2017-01-01

    that forest tree species will undergo population-level extirpation or species-level extinction during the next century. Project CAPTURE (Conservation Assessment and Prioritization of Forest Trees Under Risk of Extirpation) is a cooperative effort across the three U.S. Department of Agriculture Forest Service (USDA FS) deputy areas to establish a framework for...

  16. Project CAPTURE: using forest inventory and analysis data to prioritize tree species for conservation, management, and restoration

    Kevin M. Potter; Barbara S. Crane; William W. Hargrove

    2015-01-01

    A variety of threats, most importantly climate change and insect and disease infestation, will increase the likelihood that forest tree species could experience population-level extirpation or species-level extinction during the next century. Project CAPTURE (Conservation Assessment and Prioritization of Forest Trees Under Risk of Extirpation) is a cooperative effort...

  17. LHC related projects and studies - Part (I)

    Garoby, R.; Ponce, L.

    2012-01-01

    This session was the first of the two sessions dealing with future projects and the associated studies. Starting with descriptions of the plans and needs of the LHCb and ALICE experiments which are less extensively documented than those of ATLAS and CMS, it addressed the plans for the High Luminosity LHC and for the upgrade of the injectors, both for protons and other ions. (authors)

  18. Correlational Study of Risk Management and Information Technology Project Success

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  19. "In Situ Vascular Nerve Graft" for Restoration of Intrinsic Hand Function: An Anatomical Study.

    Mozaffarian, Kamran; Zemoodeh, Hamid Reza; Zarenezhad, Mohammad; Owji, Mohammad

    2018-06-01

    In combined high median and ulnar nerve injury, transfer of the posterior interosseous nerve branches to the motor branch of the ulnar nerve (MUN) is previously described in order to restore intrinsic hand function. In this operation a segment of sural nerve graft is required to close the gap between the donor and recipient nerves. However the thenar muscles are not innervated by this nerve transfer. The aim of the present study was to evaluate whether the superficial radial nerve (SRN) can be used as an "in situ vascular nerve graft" to connect the donor nerves to the MUN and the motor branch of median nerve (MMN) at the same time in order to address all denervated intrinsic and thenar muscles. Twenty fresh male cadavers were dissected in order to evaluate the feasibility of this modification of technique. The size of nerve branches, the number of axons and the tension at repair site were evaluated. This nerve transfer was technically feasible in all specimens. There was no significant size mismatch between the donor and recipient nerves Conclusions: The possible advantages of this modification include innervation of both median and ulnar nerve innervated intrinsic muscles, preservation of vascularity of the nerve graft which might accelerate the nerve regeneration, avoidance of leg incision and therefore the possibility of performing surgery under regional instead of general anesthesia. Briefly, this novel technique is a viable option which can be used instead of conventional nerve graft in some brachial plexus or combined high median and ulnar nerve injuries when restoration of intrinsic hand function by transfer of posterior interosseous nerve branches is attempted.

  20. The study on the immunity restoring function of cWPROL in treating experimental radiation esophagitis

    Shen Li; Shan Baoen; Zhang Li; Lu Fuhe; Guo Xiujuan

    2007-01-01

    Objective: To study the restorative function of compound white peony root oral liquids (cWPROL) in treating rats' experimental acute radiation-induced esophagitis from the aspect of immunodeficiency. Methods: 128 Wistar rats were divided into eight groups. The radiation esophagitis was induced by 43 Gy 60 Co. Then the rats were treated with medicine in different ways. On every experimental point the absolute number and percentage of T lymphocyte subsets were analyzed by flow cytometry. The changes of the leukocyte in number and differential count were detected by haemocyte counting instrument. IgG and C3 in rats' serum were analyzed by immunological turbidimetry. Results: Radiation brought on decrease of experimental rats 'leukocyte count, the lymphocyte differential count, absolute count and absolute T lymphocyte subsets in the blood and the content of IgG and C3 with radiation esophagitis. cWPROL could increase the lymphocyte percentage compared that in with the radiated group 2. The preventive (high dose) could increase lymphocyte count while Western medicine decreased rats' leukocyte count, lymphocyte percentage and absolute count (P<0.05). The absolute T lymphocyte subsets in rats' peripheral blood increased in the group infused with cWPROL (high dose) (P<0.001). Compared with the radiated group 2 the absolute T lymphocyte subsets decreased significantly(P<0.001), and the content of complement C3 increased in the group infused with cWPROL (high dose) (P<0.05) but decreased in the group infused with Western medicine (P<0.01). Conclusion: cWPROL plays the role of restoring the cytoimmunity and immunity damaged by radiation in rats with radiation esophagitis. (authors)

  1. A study on the radiopacity of cavity lining materials for posterior composite resin restoration

    Moon, Joo Hoon [Dept. of Oral and Maxillofacial Radiology, College of Dentistry, Chosun University, Kwangju (Korea, Republic of); Choi, Eui Hwan [Dept. of Conservative Dentistry, College of Dentistry, Chosun University, Kwangju (Korea, Republic of)

    2000-12-15

    The aim of this study was to determine the relative radiopacities of cavity lining materials (Resin-modified Glass Ionomer cement, Compomer and Flowable resin) for posterior composite resin restoration. Resin-modified glass ionomer cement (Fuji II LC, Vitrebond (TM)), Compomers (Dyract , Compoglass, F2000, Dyract(R) flow Compoglass Flow) and Flowable resins (Tetric (R) flow, Aeliteflo (TM) Revolution (TM)) were used. Five specimens of 5 mm in diameter and 2 mm thick were fabricated with each material. Human molars were horizontally sectioned 2 mm thick to include both enamel and dentin. The radiopacities of enamel, dentin, cavity lining materials, aluminum step wedge were obtained from conventional radiograph and NIH image program. All the tested lining materials showed levels of radiopacity the same as or greater than that of dentin. All compomer tested (Dyract (R), Compoglass, F2000, Dyract (R) flow, Compoglass Flow) and Vitrebond (TM), Tetric (R) flow were more radiopaque than enamel. The radiopacities of Fuji II LC and Revolution (TM) were between enamel and dentin and resin-modified glass ionomer cement, Compomer and Tetric (R) flow were greater than those of Revolution (TM), Aeliteflo (TM) or dentin. The level of radiopacity of the tested materials was variable; those with low radiopacity should be avoided in class II restorations, where a clear determination of recurrent caries by the examining clinician could be compromised. Clinician should be able to distinguish these cavity lining materials radiographically from recurrent decay, voids, gaps, or other defects that lead to clinical failure. Utilization of materials ranked more radiopaque than enamel would enable clinicians to distinguish the lining material from tooth structure.

  2. A study on the radiopacity of cavity lining materials for posterior composite resin restoration

    Moon, Joo Hoon; Choi, Eui Hwan

    2000-01-01

    The aim of this study was to determine the relative radiopacities of cavity lining materials (Resin-modified Glass Ionomer cement, Compomer and Flowable resin) for posterior composite resin restoration. Resin-modified glass ionomer cement (Fuji II LC, Vitrebond (TM)), Compomers (Dyract , Compoglass, F2000, Dyract(R) flow Compoglass Flow) and Flowable resins (Tetric (R) flow, Aeliteflo (TM) Revolution (TM)) were used. Five specimens of 5 mm in diameter and 2 mm thick were fabricated with each material. Human molars were horizontally sectioned 2 mm thick to include both enamel and dentin. The radiopacities of enamel, dentin, cavity lining materials, aluminum step wedge were obtained from conventional radiograph and NIH image program. All the tested lining materials showed levels of radiopacity the same as or greater than that of dentin. All compomer tested (Dyract (R), Compoglass, F2000, Dyract (R) flow, Compoglass Flow) and Vitrebond (TM), Tetric (R) flow were more radiopaque than enamel. The radiopacities of Fuji II LC and Revolution (TM) were between enamel and dentin and resin-modified glass ionomer cement, Compomer and Tetric (R) flow were greater than those of Revolution (TM), Aeliteflo (TM) or dentin. The level of radiopacity of the tested materials was variable; those with low radiopacity should be avoided in class II restorations, where a clear determination of recurrent caries by the examining clinician could be compromised. Clinician should be able to distinguish these cavity lining materials radiographically from recurrent decay, voids, gaps, or other defects that lead to clinical failure. Utilization of materials ranked more radiopaque than enamel would enable clinicians to distinguish the lining material from tooth structure.

  3. Wildlife Response to Riparian Restoration on the Sacramento River

    Gregory H Golet

    2008-06-01

    Full Text Available Studies that assess the success of riparian restoration projects seldom focus on wildlife. More generally, vegetation characteristics are studied, with the assumption that animal populations will recover once adequate habitats are established. On the Sacramento River, millions of dollars have been spent on habitat restoration, yet few studies of wildlife response have been published. Here we present the major findings of a suite of studies that assessed responses of four taxonomic groups (insects, birds, bats, and rodents. Study designs fell primarily into two broad categories: comparisons of restoration sites of different ages, and comparisons of restoration sites with agricultural and remnant riparian sites. Older restoration sites showed increased abundances of many species of landbirds and bats relative to younger sites, and the same trend was observed for the Valley elderberry longhorn beetle (Desmocerus californicus dimorphus, a federally threatened species. Species richness of landbirds and ground-dwelling beetles appeared to increase as restoration sites matured. Young restoration sites provided benefits to species that utilize early successional riparian habitats, and after about 10 years, the sites appeared to provide many of the complex structural habitat elements that are characteristic of remnant forest patches. Eleven-year old sites were occupied by both cavity-nesting birds and special-status crevice-roosting bats. Restored sites also supported a wide diversity of bee species, and had richness similar to remnant sites. Remnant sites had species compositions of beetles and rodents more similar to older sites than to younger sites. Because study durations were short for all but landbirds, results should be viewed as preliminary. Nonetheless, in aggregate, they provide convincing evidence that restoration along the Sacramento River has been successful in restoring riparian habitats for a broad suite of faunal species. Not only did

  4. Innovative Project Activities in Science [From the NSTA Study of Innovative Project Activities

    Science Teacher, 1975

    1975-01-01

    Describes four projects chosen as innovative project activities in science which exhibited identification of unique or novel problems and creative approaches to their solutions. Projects included a study of fish in Lake Erie, a goat raising project, an analysis of terrestrial plant ecology and soil composition, and a study of marine and wetlands…

  5. Genotoxic effects of silver amalgam and composite restorations: Micronuclei-Based cohort and case–control study in oral exfoliated cells

    S Jeslin Mary

    2018-01-01

    Full Text Available Context: A huge number of people carry dental fillings which contain either mercury-based amalgam and/or the recently introduced methacrylate-based resins. It has been shown that both these materials are known to be leached into the oral cavity and induce genotoxic alterations in the buccal mucosal cells. Because of its low cost and ease of manipulation, dental amalgam is still widely used as a restorative material in developing countries. The health risks associated with the components of this restorative material has always been a matter of concern. The present study was designed to assess the frequency of micronuclei (MN in oral mucosal cells as it is a promising tool for studying the genotoxic effect of clastogenic agents on them. Aims: The aim of this study is to evaluate the genotoxic effects of silver amalgam and composite restorations by measuring the mean number of MN in oral exfoliated cells. Materials and Methods: The present study was a prospective cohort study which includes a study group consisting of 110 participants. The study sample was equally divided into 55 participants requiring only amalgam restoration and 55 participants requiring only composite restoration in any permanent molar teeth. The same participants before the restoration formed the control group. Smears were obtained from each patient before and 10 days after restoration and were stained with DNA-specific Feulgen stain. The number of cells containing MN out of 500 cells were counted and recorded. After the evaluation of the slides, the results were compiled and subjected to statistical analysis. Results: There was a statistically significant (P < 0.01 variation in the mean number of MN after the restoration in both amalgam (5.41 ± 1.25 and composite (2.83 ± 0.85 restorations when compared to before the restoration. However, the mean number of MN in composite restoration was significantly less when compared to amalgam restoration. There was also a statistically

  6. Linking restoration ecology with coastal dune restoration

    Lithgow, D.; Martínez, M. L.; Gallego-Fernández, J. B.; Hesp, P. A.; Flores, P.; Gachuz, S.; Rodríguez-Revelo, N.; Jiménez-Orocio, O.; Mendoza-González, G.; Álvarez-Molina, L. L.

    2013-10-01

    Restoration and preservation of coastal dunes is urgently needed because of the increasingly rapid loss and degradation of these ecosystems because of many human activities. These activities alter natural processes and coastal dynamics, eliminate topographic variability, fragment, degrade or eliminate habitats, reduce diversity and threaten endemic species. The actions of coastal dune restoration that are already taking place span contrasting activities that range from revegetating and stabilizing the mobile substrate, to removing plant cover and increasing substrate mobility. Our goal was to review how the relative progress of the actions of coastal dune restoration has been assessed, according to the ecosystem attributes outlined by the Society of Ecological Restoration: namely, integrity, health and sustainability and that are derived from the ecological theory of succession. We reviewed the peer reviewed literature published since 1988 that is listed in the ISI Web of Science journals as well as additional references, such as key books. We exclusively focused on large coastal dune systems (such as transgressive and parabolic dunefields) located on natural or seminatural coasts. We found 150 articles that included "coastal dune", "restoration" and "revegetation" in areas such as title, keywords and abstract. From these, 67 dealt specifically with coastal dune restoration. Most of the studies were performed in the USA, The Netherlands and South Africa, during the last two decades. Restoration success has been assessed directly and indirectly by measuring one or a few ecosystem variables. Some ecosystem attributes have been monitored more frequently (ecosystem integrity) than others (ecosystem health and sustainability). Finally, it is important to consider that ecological succession is a desirable approach in restoration actions. Natural dynamics and disturbances should be considered as part of the restored system, to improve ecosystem integrity, health and

  7. The Project TALENT Twin and Sibling Study.

    Prescott, Carol A; Achorn, Deanna Lyter; Kaiser, Ashley; Mitchell, Lindsey; McArdle, John J; Lapham, Susan J

    2013-02-01

    Project TALENT is a US national longitudinal study of about 377,000 individuals born in 1942-1946, first assessed in 1960. Students in about 1,200 schools participated in a 2-day battery covering aptitudes, abilities, interests, and individual and family characteristics (Flanagan, 1962; www.projectTALENT.org). Follow-up assessments 1, 5, and 11 years later assessed educational and occupational outcomes. The sample includes approximately 92,000 siblings from 40,000 families, including 2,500 twin pairs and 1,200 other siblings of twins. Until recently, almost no behavior genetic research has been conducted with the sample. In the original data collection information was not collected with the intent to link family members. Recently, we developed algorithms using names, addresses, birthdates, and information about family structure to link siblings and identify twins. We are testing several methods to determine zygosity, including use of yearbook photographs. In this paper, we summarize the design and measures in Project TALENT, describe the Twin and Sibling sample, and present our twin-sib-classmate model. In most twin and family designs, the 'shared environment' includes factors specific to the family combined with between-family differences associated with macro-level variables such as socioeconomic status. The school-based sampling design used in Project TALENT provides a unique opportunity to partition the shared environment into variation shared by siblings, specific to twins, and associated with school- and community-level factors. The availability of many measured characteristics on the family, schools, and neighborhoods enhances the ability to study the impact of specific factors on behavioral variation.

  8. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  9. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2002 Annual Report.

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2003-06-30

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day, who contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2002, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies

  10. Posterior bulk-filled resin composite restorations. A 5-year randomized controlled clinical study

    van Dijken, Jan WV; Pallesen, Ulla

    2016-01-01

    mm as needed to fill the cavity 2 mm short of the occlusal cavosurface. The occlusal part was completed with the nano-hybrid resin composite (Ceram X mono+). In the other cavity, the resin composite-only (Ceram X mono+) was placed in 2 mm increments. The restorations were evaluated using slightly......, 4 SDR-CeramX mono+ and 6 CeramX mono +-only restorations. The main reasons for failure were tooth fracture (6) and secondary caries (4). The annual failure rate (AFR) for all restorations (Class I and II) was for the bulk-filled-1.1% and for the resin composite-only restorations 1.3% (p = 0...

  11. Plant traits in response to raising groundwater levels in wetland restoration : evidence from three case studies

    Bodegom, P.M. van; Grootjans, A.P.; Sorrell, B.K.; Bekker, R.M.; Bakker, C.; Ozinga, W.A.; Middleton, B.

    Question: Is raising groundwater tables successful as a wetland restoration strategy? Location: Kennemer dunes, The Netherlands; Moksloot dunes, The Netherlands and Bullock Creek fen, New Zealand. Methods: Generalizations were made by analysing soil dynamics and the responsiveness of integrative

  12. Plant traits in response to raising groundwater levels in wetland restoration: evidence from three case studies

    Bodegom, van P.M.; Grootjans, A.P.; Sorrell, B.K.; Bekker, R.M.; Bakker, C.; Ozinga, W.A.

    2006-01-01

    Question: Is raising groundwater tables successful as a wetland restoration strategy? Location: Kennemer dunes, The Netherlands; Moksloot dunes, The Netherlands and Bullock Creek fen, New Zealand. Methods: Generalizations were made by analysing soil dynamics and the responsiveness of integrative

  13. The Citizenship Safety Project: a pilot study.

    Frederick, K; Barlow, J

    2006-02-01

    The Government White Paper Saving Lives: Our Healthier Nation (1999) provides a clear indication that accidents are a serious public health problem and have been targeted by the Department of Health as a key area for prevention over the next 10 years. School-based injury prevention programmes have been identified as one of the key settings for the implementation of the White Paper's heath promotion strategies. The Citizen Safety Project (CSP) is a peer-delivered injury prevention programme for Year 10 students (14-15 years) and Year 2 pupils (6-7 years). This paper summarizes the findings of a pilot study that assessed the feasibility of implementing the CSP in schools and of conducting a larger study. Working as part of their Personal Social Health Education lessons, 11 pairs (n = 22) of Year 10 students developed a project to take one accident prevention theme of their choice into a primary school to teach small groups of five or six Year 2 pupils (n = 55). A formative evaluation was conducted, based on interviews with Year 2 and Year 10 teachers (n = 2), and the diaries of Year 10 students. Knowledge of accident prevention and risk awareness was measured in Year 2 pupils using the Draw and Write technique, and impact on Year 10 students was measured using self-esteem and locus of control inventories. Using both statistical and thematic analysis the study concludes that the CSP is well accepted, improves knowledge in Year 2 pupils and boosts confidence in Year 10 students, while concurrently achieving key stage attainment targets. Implications of the study are discussed in terms of future research, as are recommendations with regard to modifications to the project.

  14. The Ranger project - a case study

    Young, R.I.

    1983-01-01

    Ranger Uranium Mines Pty. Ltd. operates an open pit mine and ore treatment plant in the Northern Territory designed to produce 3000 tonne/yr of U 3 O 8 from 3500 tonne/day of mill feed. The construction of the project was completed in 1981. Wright-Davy were the project managers and designers of the $270 million ore treatment plant and associated infrastructure. Details of project cost, staffing, project design and project systems are given

  15. Hydrological classification, a practical tool for mangrove restoration

    Loon, van Anne F.; Brake, te Bram; Huijgevoort, Van Marjolein H.J.; Dijksma, Roel

    2016-01-01

    Mangrove restoration projects, aimed at restoring important values of mangrove forests after degradation, often fail because hydrological conditions are disregarded. We present a simple, but robust methodology to determine hydrological suitability for mangrove species, which can guide restoration

  16. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR), Nevada, Revision 0

    Matthews, Patrick; Burmeister, Mark

    2014-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion (NTTR). CAU 415 is located on Range 4808A of the Nevada Test and Training Range (NTTR) and consists of one corrective action site: NAFR-23-02, Pu Contaminated Soil. The CAU 415 site consists of the atmospheric release of radiological contaminants to surface soil from the Project 57 safety experiment conducted in 1957. The safety experiment released plutonium (Pu), uranium (U), and americium (Am) to the surface soil over an area of approximately 1.9 square miles. This area is currently fenced and posted as a radiological contamination area. Vehicles and debris contaminated by the experiment were subsequently buried in a disposal trench within the surface-contaminated, fenced area and are assumed to have released radiological contamination to subsurface soils. Potential source materials in the form of pole-mounted electrical transformers were also identified at the site and will be removed as part of closure activities.

  17. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    Survochak, Scott [USDOE Office of Legacy Management, Washington, DC (United States); Daniel, Joe [Navarrao Research and Engineering, Inc., Oak Ridge, TN (United States)

    2017-01-01

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)—trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

  18. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    Survochak, Scott; Daniel, Joe

    2017-01-01

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)-trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

  19. Fracture resistance of structurally compromised and normal endodontically treated teeth restored with different post systems: An in vitro study

    Vajihesadat Mortazavi

    2012-01-01

    Full Text Available Background: With the aim of developing methods that could increase the fracture resistance of structurally compromised endodontically treated teeth, this study was conducted to compare the effect of three esthetic post systems on the fracture resistance and failure modes of structurally compromised and normal roots. Materials and Methods: Forty five extracted and endodontically treated maxillary central teeth were assigned to 5 experimental groups (n=9. In two groups, the post spaces were prepared with the corresponding drills of the post systems to be restored with double taper light posts (DT.Light-Post (group DT.N and zirconia posts (Cosmopost (group Zr.N. In other 3 groups thin wall canals were simulated to be restored with Double taper Light posts (DT.W, double taper Light posts and Ribbond fibers (DT+R.W and Zirconia posts (Zr.W. After access cavity restoration and thermocycling, compressive load was applied and the fracture strength values and failure modes were evaluated. Data were analyzed using two-way ANOVA, Tukey and Fisher exact tests (P<0.05. Results: The mean failure loads (N were 678.56, 638.22, 732.44, 603.44 and 573.67 for groups DT.N, Zr.N, DT.W, DT+R.W and Zr.w respectively. Group DT+R.W exhibited significantly higher resistance to fracture compared to groups Zr.N, DT.W and Zr.w (P<0.05. A significant difference was detected between groups DT.N and Zr.W (P=0.027. Zirconia posts showed significantly higher root fracture compared to fiber posts (P=0.004. Conclusion: The structurally compromised teeth restored with double taper light posts and Ribbond fibers showed the most fracture resistance and their strengths were comparable to those of normal roots restored with double taper light posts. More desirable fracture patterns were observed in teeth restored with fiber posts.

  20. The importance of genetic make-up in seagrass restoration : a case study of the seagrass Zostera noltei

    Jahnke, Marlene; Serra, Ilia Anna; Bernard, Guillaume; Procaccini, Gabriele

    2015-01-01

    Seagrass meadows are among the most important coastal ecosystems. Their ongoing decline is of concern, and transplantations are carried out in many parts of the world to restore the ecosystem services seagrass meadows provide. Several studies have highlighted the importance of genetic diversity for

  1. Studying long-term, large-scale grassland restoration outcomes to improve seeding methods and reveal knowledge gaps

    1) Considerable research is currently focused on restoring the World’s degraded grasslands by introducing species from seed. The research is continually providing valuable new insights into early seeded plant establishment, but more emphasis on longer, larger studies is needed to better quantify s...

  2. Ecological, political and social challenges of prescribed fire restoration in east Texas pineywoods ecosystems: a case study

    Sandra Rideout; Brian P. Oswald; Michael H. Legg

    2003-01-01

    The effectiveness of prescribed fire restoration of forested sites in three state parks in east Texas, USA was studied. Two sites consisted of mixed shortleaf (Pinus echinata Mill.) or loblolly pine (Pinus taeda L.) and broadleaf overstoreys. The third site was a longleaf pine (Pinus palustris Mill.)/little...

  3. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: watershed restoration projects: annual report, 1999.; ANNUAL

    2001-01-01

    The John Day River is the second longest free-flowing river in the contiguous United States and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1999, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional eleven (11

  4. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: watershed restoration projects: annual report, 1998.; ANNUAL

    1999-01-01

    The John Day River is the second longest free-flowing river in the contiguous US and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1998, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional ten (10) watershed

  5. Model Studies on the Effectiveness of MBBR Reactors for the Restoration of Small Water Reservoirs

    Nowak, Agata; Mazur, Robert; Panek, Ewa; Chmist, Joanna

    2018-02-01

    The authors present the Moving Bed Biofilm Reactor (MBBR) model with a quasi-continuous flow for small water reservoir restoration, characterized by high concentrations of organic pollutants. To determine the efficiency of wastewater treatment the laboratory analysis of physic-chemical parameters were conducted for the model on a semi-technical scale of 1:3. Wastewater treatment process was carried out in 24 h for 1 m3 for raw sewage. The startup period was 2 weeks for all biofilters (biological beds). Approximately 50% reduction in COD and BOD5 was obtained on average for the studied bioreactors. Significant improvements were achieved in theclarity of the treated wastewater, with the reduction of suspension by 60%. The oxygen profile has improved significantly in 7 to 9 hours of the process, and a diametric reduction in the oxidative reduction potential was recorded. A preliminary model of biological treatment effectiveness was determined based on the conducted studies. In final stages, the operation mode was set in real conditions of polluted water reservoirs.

  6. Restoration of floodplain meadows: Effects on the re-establishment of mosses

    Wolski, Grzegorz J.; Harnisch, Matthias; Otte, Annette; Bomanowska, Anna; Donath, Tobias W.

    2017-01-01

    Vascular plants serve as target species for the evaluation of restoration success as they account for most of the plant species diversity and vegetation cover. Although bryophytes contribute considerably to the species diversity of meadows, they are rarely addressed in restoration projects. This project is a first step toward making recommendations for including mosses in alluvial floodplain restoration projects. The opportunity to assess the diversity and ecological requirements of mosses on floodplain meadows presented itself within the framework of a vegetation monitoring that took place in 2014 on meadows located along the northern Upper Rhine. In this area, large-scale meadow restoration projects have taken place since 1997 in both the functional and fossil floodplains. Other studies have shown that bryophytes are generally present in green hay used in restoration, providing inadvertent bryophyte introduction. We compared bryophyte communities in donor and restored communities and correlated these communities with environmental variables—taking into account that the mosses on the restoration sites possibly developed from green hay. This analysis provided insights as to which species of bryophytes should be included in future restoration projects, what diaspores should be used, and how they should be transferred. Data on bryophyte occurrence were gathered from old meadows, and from restoration sites. We found distinct differences in bryophyte composition (based on frequency) in restored communities in functional flood plains compared to donor communities. Generally, restoration sites are still characterized by a lower species-richness, with a significantly lower occurrence of rare and red listed species and a lower species-heterogeneity. In conclusion, our research establishes what mosses predominate in donor and restored alluvial meadows along the northern Upper River, and what microsite conditions favour particular species. This points the way to deliberate

  7. Studies on the restoration succession of PFU microbial communities in a pilot-scale microcosm.

    Jiang, Jian-Guo; Shen, Yun-Fen

    2007-06-01

    In order to imitate the restoration succession process of natural water ecosystem, a laboratory microcosm system of constant-flow-restoration was designed and established. A eutrophycation lake, Lake Donghu, was selected as the subject investigated. Six sampling stations were set on the lake, among which the water of station IV was natural clean water, and others were polluted with different degrees. Polyurethane foam unit microbial communities, which had colonized in the stations for a month, were collected from these stations and placed in their respective microcosms, using clean water of station IV to gradually replace the water of these microcosms. In this process, the healthy community in clean water continuously replaced the damaged communities in polluted water, the restoration succession of the damaged communities was characterized by weekly determination of several functional and structural community parameters, including species number (S), diversity index (DI), community pollution value (CPV), heterotrophy index (HI), and similarity coefficient. Cluster analysis based on similarity coefficient was used to compare the succession discrepancies of these microbial communities from different stations. The ecological succession of microbial communities during restoration was investigated by the variable patterns of these parameters, and based on which, the restoration standards of these polluted stations were suggested in an ecological sense. That was, while being restored, the water of station 0 (supereutrophycation) should be substituted with natural clean water by 95%; station I (eutrophycation), more than 90%; station II (eutrophycation), more than 85%; station III (eutrophycation), about 85%; station V (mesoeutrophycation), less than 50%. The effects of the structural and functional parameters in monitoring and assessing ecological restoration are analyzed and compared.

  8. Restoration in South Africa

    Blignaut, J

    2010-01-01

    Full Text Available Restoration can provide a wide range of direct and indirect benefits to society. However, there are very few projects that have attempted to properly quantify those benefits and present them in such a way that society is motivated to invest...

  9. Shade variance in ceramic restoration and shade tab: An in vitro study

    Pannaikadu Somasundaram Prabu

    2012-01-01

    Full Text Available Background: In clinical practice aesthetics for any restoration needs to consider the parameters of surface form, translucency and colour.To achieve ideal aesthetics the colour replication process for dental porcelain is the most important step which comprises of a shade selection phase followed by shade duplication. Materials and Methods: The ceramic brands Vita VMK95 (classic and Ivoclar classic V were used for comparison with Vita classic shade tab guide shades A2 and B2. The samples were made of specific shape, size, and were of the recommended dimensions from investing self-cure acrylic strips to casted NiCr specimens Objective. The objective of this study was to quantify the results in CIE AE units system for the colour differences between the Vita shade guide colours and two commercial porcelains for metal ceramic crowns. Results: The results indicated that the porcelains do not match the shade guides to which they are compared and shade variations exist between different lots of porcelain from the same and different manufacturer. Conclusion: Problems identified that porcelains do not match the shade guides to which they are compared and shade variations exist between different lots of porcelain from the same and different manufacturer

  10. Restoration of a wild grey partridge shoot: a major development in the Sussex study, UK

    Ewald, J. A.

    2012-01-01

    Full Text Available The scientific basis of wild grey partridge management has been known for a generation. This includes controlling nest predators, providing nesting cover, having sufficient insect food for chicks and appropriate rates of shooting. More recently, measures such as providing food for adult birds and habitats for protection from birds of prey have also been considered important. Habitat provision can be expensive, but in the UK costs can be partially recovered through governmental agri–environment schemes. The landowner still needs to pay for the essential gamekeeper. Since 2003/04, one part of the Game & Wildlife Conservation Trust’s (GWCT Sussex Study area has put these principles of environmental management into practice with the aim of restoring a wild grey partridge shoot to this part of Southern England. Results have been impressive, with the spring pair density increasing from 0.3 pairs/100 ha in 2003 to nearly 20 pairs/100 ha in 2010 on an area of just over 10 km2. Over the past two years a wild grey partridge shoot has taken place, and the landowner and his team have gained national recognition for their conservation work.

  11. Location Independent Professional Project: A Pilot Study

    Hudson, J.A.; Long, J.P.; Miller, M.M.

    1999-02-01

    This pilot study project explored the problem of providing access to the nomadic worker who desires to connect a computer through network access points at a number of different locations within the SNL/NM campus as well as outside the campus. The design and prototype development gathered knowledge that may allow a design to be developed that could be extended to a larger number of SNL/NM network drop boxes. The focus was to provide a capability for a worker to access the SNL IRN from a network drop box (e.g. in a conference room) as easily as when accessing the computer network from the office normally used by the worker. Additional study was done on new methods to authenticate the off campus worker, and protect and control access to data.

  12. Ecological restoration of litter in mined areas

    Teresinha Gonçalves Bizuti, Denise; Nino Diniz, Najara; Schweizer, Daniella; de Marchi Soares, Thaís; Casagrande, José Carlos; Henrique Santin Brancalion, Pedro

    2016-04-01

    The success of ecological restoration projects depends on going monitoring of key ecological variables to determine if a desired trajectory has been established and, in the case of mining sites, nutrient cycling recovery plays an utmost importance. This study aimed to quantify and compare the annual litter production in native forests, and in restoration sites established in bauxite mines. We collected samples in 6 native forest remnants and 6 year-old restoration sites every month for a period of one year, in the city of Poços de Caldas/MG, SE Brazil. 120 wire collectors were used (0,6x0,6) and suspended 30cm above the soil surface. The material was dried until constant weight, weighed and fractionated in leaves, branches and reproductive material. The average annual litter production was 2,6 Mg ha-1 in native forests and 2,1 in forest in restoration sites, differing statistically. Litter production was higher in the rainy season, especially in September. Among the litter components, the largest contributor to total production was the fraction leaves, with 55,4% of the total dry weight of material collected, followed by reproductive material which contributed 24,5% and branches, with 20%. We conclude that the young areas in restoration process already restored important part, but still below the production observed in native areas.

  13. Interim restorations.

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  14. Restoring forests

    Jacobs, Douglass F.; Oliet, Juan A.; Aronson, James

    2015-01-01

    of land requiring restoration implies the need for spatial prioritization of restoration efforts according to cost-benefit analyses that include ecological risks. To design resistant and resilient ecosystems that can adapt to emerging circumstances, an adaptive management approach is needed. Global change......, in particular, imparts a high degree of uncertainty about the future ecological and societal conditions of forest ecosystems to be restored, as well as their desired goods and services. We must also reconsider the suite of species incorporated into restoration with the aim of moving toward more stress resistant...... and competitive combinations in the longer term. Non-native species may serve an important role under some circumstances, e.g., to facilitate reintroduction of native species. Propagation and field establishment techniques must promote survival through seedling stress resistance and site preparation. An improved...

  15. Bacterial adhesion on direct and indirect dental restorative composite resins: An in vitro study on a natural biofilm.

    Derchi, Giacomo; Vano, Michele; Barone, Antonio; Covani, Ugo; Diaspro, Alberto; Salerno, Marco

    2017-05-01

    Both direct and indirect techniques are used for dental restorations. Which technique should be preferred or whether they are equivalent with respect to bacterial adhesion is unclear. The purpose of this in vitro study was to determine the affinity of bacterial biofilm to dental restorative composite resins placed directly and indirectly. Five direct composite resins for restorations (Venus Diamond, Adonis, Optifil, Enamel Plus HRi, Clearfil Majesty Esthetic) and 3 indirect composite resins (Gradia, Estenia, Signum) were selected. The materials were incubated in unstimulated whole saliva for 1 day. The biofilms grown were collected and their bacterial cells counted. In parallel, the composite resin surface morphology was analyzed with atomic force microscopy. Both bacterial cell count and surface topography parameters were subjected to statistical analysis (α=.05). Indirect composite resins showed significantly lower levels than direct composite resins for bacterial cell adhesion, (Pcomposite resins (P>.05). However, within the indirect composite resins a significantly lower level was found for Gradia than Estenia or Signum (Pcomposite resin roughness and bacterial adhesion when the second and particularly the third-order statistical moments of the composite resin height distributions were considered. Indirect dental restorative composite resins were found to be less prone to biofilm adhesion than direct composite resins. A correlation of bacterial adhesion to surface morphology exists that is described by kurtosis; thus, advanced data analysis is required to discover possible insights into the biologic effects of morphology. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  16. Studies on the male sterility-fertility restoration system of AE. Kotschyi 19

    Cheng Junyuan; Sun Guoqing; Liu Luxiang; Zhao Linshu; Lu Xiuxia

    1996-01-01

    Sterile plants were obtained from the distant hybridization between Ae. Kotschyi 19 as the female parent and the Chinese Spring and T. yunnanense King as the male parent. Common wheat lines were used to testcross and backcross with the F 1 sterile plants successively. Male sterile line K-19 with Ae. Kotschyi cytoplasm and common wheat nucleus was bred. Over 10 K-19 MS lines were obtained. They are steady without monoploid. 7 restorers were obtained with the restoring ability from 88.2% to 96.9% according to the domestic method, from 116.4% to 150.4% according to the international method

  17. River restoration: separating myths from reality

    Friberg, N.; Woodward, G.

    2015-12-01

    River restorations are a social construct where degraded systems are physically modified to obtain a pre-disturbance set of attributes. These can be purely esthetic but are often linked to some kind of biotic recovery or the provision of important ecosystem services such as flood control or self-purification. The social setting of restoration projects, with a range of potential conflicts, significantly reduces scale of most interventions to a size with little room, or wish, for natural processes. We show that projects sizes are still very small and that the restoration target is not to recover natural geomorphic processes but rather to fulfil human perception of what a nice stream looks like. One case from Danish lowland streams, using a space-for-time substitution approach, shows excess use of pebble and gravel when restoring channelized sandy bottom streams, de-coupling the link between energy and substrate characteristics that are found in natural lowland systems. This has implication for both the biological structure and functioning of these systems as a direct link between substrate heterogeneity and macroinvertebrate diversity was not found in restored streams, while the density of grazer increased indicating an increased use of periphyton as a basal resource. Another case of adding woody debris to UK lowland streams, using a BACI study design, showed very little effect on the macroinvertebrate community even after a 100-year flood, which indicate that added tree trunks did not provide additional flow refugia. We suggest that restoration schemes should aim at restoring the natural physical structural complexity in the streams and at the same time enhance the possibility of re-generating the natural geomorphological processes sustaining the habitats in streams and rivers.

  18. Methodology for ranking restoration options

    Jensen, Per Hedemann

    1999-01-01

    techniques as a function of contamination and site characteristics. The project includes analyses of existing remediation methodologies and contaminated sites, and is structured in the following steps:-characterisation of relevant contaminated sites -identication and characterisation of relevant restoration...... techniques -assessment of the radiological impact -development and application of a selection methodology for restoration options -formulation ofgeneric conclusions and development of a manual The project is intended to apply to situations in which sites with nuclear installations have been contaminated...

  19. A comparative study of the accuracy between plastic and metal impression transfer copings for implant restorations.

    Fernandez, Monica A; Paez de Mendoza, Carmen Y; Platt, Jeffrey A; Levon, John A; Hovijitra, Suteera T; Nimmo, Arthur

    2013-07-01

    A precise transfer of the position and orientation of the antirotational mechanism of an implant to the working cast is particularly important to achieve optimal fit of the final restoration. This study evaluated and compared the accuracy of metal and plastic impression copings for use in a full-arch mandibular edentulous simulation with four implants. Metal and plastic impression transfer copings for two implant systems, Nobel Biocare™ Replace and Straumann SynOcta®, were assessed on a laboratory model to simulate clinical practice. The accuracy of producing stone casts using these plastic and metal impression transfer copings was measured against a standard prosthetic framework consisting of a cast gold bar. A total of 20 casts from the four combinations were obtained. The fit of the framework on the cast was tested by a noncontact surface profilometer, the Proscan 3D 2000 A, using the one-screw test. The effects of implant/system and impression/coping material on gap measurements were analyzed using repeated measures ANOVA. The findings of this in vitro study were as follows: plastic copings demonstrated significantly larger average gaps than metal for Straumann (p = 0.001). Plastic and metal copings were not significantly different for Nobel (p = 0.302). Nobel had significantly larger average gaps than Straumann for metal copings (p = 0.003). Nobel had marginally smaller average gaps than Straumann (p = 0.096) for plastic copings. The system-by-screw location interaction was significant as well (p impression copings were more accurate than plastic copings when using the Straumann system, and there was no difference between metal and plastic copings for the Nobel Replace system. The system-by-screw location was not conclusive, showing no correlation within each system. © 2013 by the American College of Prosthodontists.

  20. Combined association of clinical and lifestyle factors with non-restorative sleep: The Nagahama Study.

    Takeshi Matsumoto

    Full Text Available Non-restorative sleep (NRS was suggested to be associated with cardiovascular outcomes. However, causative factors for NRS have not been fully elucidated. This study aimed to clarify factors and their relationships with NRS to better understand the clinical and epidemiological implications of NRS and to develop a score that can objectively evaluate NRS status.Study subjects consisted of 9,788 community residents (age 53.6 ± 13.4 y. Subjective NRS as well as possible clinical and lifestyle factors for NRS were investigated by questionnaires. Other clinical parameters were obtained from personal records of information obtained at the baseline examination.A total of 3,261 participants complained of NRS. Factors independently associated with subjective NRS were younger age (odds ratio = 1.43, use of a hypnotic drug (2.04, irregular sleep schedule (2.02, short sleep duration (<5 h, 11.7; 5-6 h, 4.81; 6-7 h, 2.40, frequent sleepiness (2.33, routine stress (4.63, no habitual exercise (1.61, nocturia symptoms (1.43, symptoms of gastroesophageal reflux disease (1.44, and depression (1.46 (all P <0.001. The NRS score comprised of these 10 factors was linearly associated with the frequency of subjective NRS (Ptrend <0.001. Frequency of individuals with a high NRS score was greater in women (52.3% than in men (42.1%, P<0.001, while no clear association was observed with common risk factors for cardiovascular diseases.NRS was a phenomenon representing various clinical and lifestyle features. Careful attention should be paid to individuals with a high NRS score who might be at risk for mental fatigue and have unfavorable lifestyle factors.

  1. Some new machine projects studied at LNS

    Tkatchenko, A.

    1983-01-01

    In front of the increasing interest for the synchrotron radiation uses, the electron storage rings have been gradually transformed in light sources. Yet, those machines had not been optimized for this use. So, in the last 10 years, numerous optimized machines have been defined and destinated to sole synchrotron light production up to the X domain. In the French domain, several projects have been elaborated, to satisfy the national needs in far UV and X radiation. - SUPER-ACO project (0,8 GeV) from Orsay. Its realisation is in progress. - SIREM project (1,2 GeV) from Grenoble CEN. - European ESRF project (5 GeV) optimized for X radiation, and for which a work group has been installed at CERN. - A X radiation national machine project (3 or 4 GeV) derived from the ESRF one. - At last, the Mars project, concerning a X radiation source storage ring aimed to a industrial use: the microlithographie [fr

  2. Effects of salinity and particle concentration on sediment hydrodynamics and critical bed-shear-stress for erosion of fine grained sediments used in wetland restoration projects

    Ghose-Hajra, M.; McCorquodale, A.; Mattson, G.; Jerolleman, D.; Filostrat, J.

    2015-03-01

    Sea-level rise, the increasing number and intensity of storms, oil and groundwater extraction, and coastal land subsidence are putting people and property at risk along Louisiana's coast, with major implications for human safety and economic health of coastal areas. A major goal towards re-establishing a healthy and sustainable coastal ecosystem has been to rebuild Louisiana's disappearing wetlands with fine grained sediments that are dredged or diverted from nearby rivers, channels and lakes to build land in open water areas. A thorough geo-hydrodynamic characterization of the deposited sediments is important in the correct design and a more realistic outcome assessment of the long-term performance measures for ongoing coastal restoration projects. This paper evaluates the effects of salinity and solid particle concentration on the re-suspension characteristics of fine-grained dredged sediments obtained from multiple geographic locations along the Gulf coast. The critical bed-shear-stress for erosion has been evaluated as a function of sedimentation time. The sediment hydrodynamic properties obtained from the laboratory testing were used in a numerical coastal sediment distribution model to aid in evaluating sediment diversions from the Mississippi River into Breton Sound and Barataria Bay.

  3. Effects of salinity and particle concentration on sediment hydrodynamics and critical bed-shear-stress for erosion of fine grained sediments used in wetland restoration projects

    M. Ghose-Hajra

    2015-03-01

    Full Text Available Sea-level rise, the increasing number and intensity of storms, oil and groundwater extraction, and coastal land subsidence are putting people and property at risk along Louisiana’s coast, with major implications for human safety and economic health of coastal areas. A major goal towards re-establishing a healthy and sustainable coastal ecosystem has been to rebuild Louisiana’s disappearing wetlands with fine grained sediments that are dredged or diverted from nearby rivers, channels and lakes to build land in open water areas. A thorough geo-hydrodynamic characterization of the deposited sediments is important in the correct design and a more realistic outcome assessment of the long-term performance measures for ongoing coastal restoration projects. This paper evaluates the effects of salinity and solid particle concentration on the re-suspension characteristics of fine-grained dredged sediments obtained from multiple geographic locations along the Gulf coast. The critical bed-shear-stress for erosion has been evaluated as a function of sedimentation time. The sediment hydrodynamic properties obtained from the laboratory testing were used in a numerical coastal sediment distribution model to aid in evaluating sediment diversions from the Mississippi River into Breton Sound and Barataria Bay.

  4. Clinical observation of small-incision extracapsular cataract extraction with intraocular lens implantation for the treatment of cataract in the sight restoration project

    Xiao-Jian Cheng

    2014-04-01

    Full Text Available AIM: To analyze the clinical effects of small-incision extracapsular cataract extraction with intraocular lens implantation for the treatment of cataract.METHODS:Totally 642 cases 676 eyes of cataract were treated by small-incision extracapsular cataract extraction with intraocular lens implantation. Complication during and after operations and postoperative visual acuity was observed.RESULTS:Visual acuity of 670 eyes was ≥0.05 and off-blindness rate was 99.11%, and there was 627 eyes ≥0.3 and the off-disability rate was 92.75% after 1mo. Rupture of posterior capsule during surgery occurred in 24 eyes. Fifty-four eyes were corneal edema, and anterior chamber exudation were 26 eyes, and 23 eyes were hypertension after operation. CONCLUSION: There are a little complications during and after operation for cataract treated by small-incision extracapsular cataract extraction with intraocular lens implantation. Patients have good recovery after operation. This operation does not need high-standard equipments and is suitable in the sight restoration project.

  5. Green Walls for a Restorative Classroom Environment : A Controlled Evaluation Study

    van den Berg, Agnes E; Wesselius, Janke E; Maas, Jolanda; Tanja-Dijkstra, Karin

    2017-01-01

    In the present research, we evaluated the restorative impacts of green walls with living plants in classrooms of two elementary schools using a controlled, prospective design with baseline measurements and follow-ups at 2 and 4 months. At each time of measurement, children's (n = 170, age = 7-10)

  6. Performance Evaluation and Field Application of Porous Vegetation Concrete Made with By-Product Materials for Ecological Restoration Projects

    Hwang-Hee Kim; Chan-Gi Park

    2016-01-01

    The purpose of this study was to evaluate the performance of porous vegetation concrete block made from blast furnace slag cement containing industrial by-products such as blast furnace slag aggregate and powder. The blocks were tested for void ratio, compressive strength and freeze-thaw resistance to determine the optimal mixing ratio for the porous vegetation block. An economic analysis of the mixing ratio showed that the economic efficiency increased when blast furnace slag aggregate and c...

  7. Evaluation of Koontz Lake (North Indiana) Ecological Restoration Options - Comparison of Dredging and Aeration - and Broad Application to USACE Projects

    2018-01-01

    necessity of dredging, special water treatment, and maintenance of shipping and stream channels (Glassner-Shwayder 1993). Influxes of sediment have an...eutrophication, harmful algae, invasive plants, and shallowing due to accumulation of sediment and muck. A study was conducted to assist in evaluating... sediments . (The U.S. Army Engineer Research and Development Center does not endorse any specific products or brands). DISCLAIMER: The contents of this

  8. Restoration of high zinc and lead tailings with municipal biosolids and lime: a field study.

    Brown, Sally; Svendsen, Alex; Henry, Chuck

    2009-01-01

    A field study was conducted to test the ability of biosolids (BS) and different types of lime to increase soil pH, neutralize subsoil acidity, and restore a vegetative cover to alluvial mine tailings in Leadville, CO. The tailings had soil pH of 5.2 and total Cd, Pb, and Zn of 75+/-20, 2600+/-1100, and 6700+/-1900 mg kg(-1). Types of lime included agricultural lime (AL), sugar beet lime (SBL), and lime kiln dust (LKD) applied at 224 Mg ha(-1) calcium carbonate equivalent. Plots were established in 2000 and monitored intermittently through 2007. All amendments increased pH in surface and subsurface depths, with LKD, LKD+BS, and SBL+BS being the most effective. Amendments also reduced 0.01 mol L(-1) Ca(NO3)2 extractable Zn and Cd compared to the control. Plant growth was sparse on all treatments with limited yield for three of four harvests. Poor growth may have been related to elevated electrical conductivity (EC). All amendments except LKD alone (5.79 dS m(-1)) increased EC compared to the control treatment (5.28 dS m(-1)). Electrical conductivity was highest in 2002 which had the lowest summer rainfall. In 2005 EC in all treatments except the SBL+BS was similar in the surface soil. Aboveground plant tissue concentrations of Zn and Cd were also elevated. Limited precipitation and high electrical conductivity may be responsible for poor plant growth. Higher rainfall for the last sampling period resulted in significant growth in the LKD+BS, SBL+BS, and LKD alone treatments.

  9. In-situ leaching of crownpoint, NM, uranium ore: Part 7 - Laboratory study of chemical agents for molybdenum restoration

    Strom, E.T.; Vogt, T.C.

    1987-01-01

    One possible drawback to the use of an in-situ leaching to recover uranium is the potential release of previously insoluble chemical species into the formation water. Before a pilot test of in-situ uranium leaching at Crownpoint, NM, was begun, extensive laboratory studies were undertaken to develop chemical methods for treating one possible contaminant, molybdenum (Mo). New Mexico regulations restrict the amount of Mo permissable in formation waters after leaching to less than 1 ppm. Two techniques to restore Mo after leaching were studied with core and pack tests. These studies suggest that if Mo restoration problems occur in the field, the use of precipitating agents such as Ca/sup 2+/ or reducing agents such as Fe/sup 2+/ may be helpful in ameliorating such problems

  10. The Dynamics of Project-Based Learning Extension Courses: The "Laboratory of Social Projects" Case Study

    Arantes do Amaral, Joao Alberto

    2017-01-01

    In this case study we discuss the dynamics that drive a free-of-charge project-based learning extension course. We discuss the lessons learned in the course, "Laboratory of Social Projects." The course aimed to teach project management skills to the participants. It was conducted from August to November of 2015, at Federal University of…

  11. Regional nuclear fuel cycle centers study project

    Bennett, L.; Catlin, R.G.; Meckoni, V.

    1977-01-01

    The concept of regional fuel cycle centers (RFCC) has attracted wide interest. The concept was endorsed by many countries in discussions at the General Conference of the International Atomic Energy Agency and at the General Assembly of the United Nations. Accordingly, in 1975, the IAEA initiated a detailed study of the RFCC concept. The Agency study has concentrated on what is referred to as the ''back-end'' of the fuel cycle because that is the portion which is currently problematic. The study covers transport, storage, processing and recycle activities starting from the time the spent fuel leaves the reactor storage pools and through all steps until the recycled fuel is in finished fuel elements and shipped to the reactor. A detailed evaluation of the specific features of large regional fuel cycle centers established on a multinational basis vis-a-vis smaller dispersed fuel cycle facilities set up on a national basis has been carried out. The methodology for assessment of alternative strategies for fuel storage, reprocessing, and recycling of plutonium has been developed, characteristic data on material flows and cost factors have been generated, and an analytic system has been developed to carry out such evaluations including appropriate sensitivity analysis. Studies in related areas on institutional and legal, organizational, environmental, materials control and other essential aspects have also been made. The material developed during the course of this Study would enable any group of interested Member States to examine and work out alternative strategies pertinent to their present and projected nuclear fuel cycle needs, as well as evolve institutional, legal and other appropriate frameworks or agreements for the establishment of fuel cycle centers on a multinational cooperative basis

  12. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  13. Long-term competence restoration.

    Morris, Douglas R; DeYoung, Nathaniel J

    2014-01-01

    While the United States Supreme Court's Jackson v. Indiana decision and most state statutes mandate determinations of incompetent defendants' restoration probabilities, courts and forensic clinicians continue to lack empirical evidence to guide these determinations and do not yet have a consensus regarding whether and under what circumstances incompetent defendants are restorable. The evidence base concerning the restoration likelihood of those defendants who fail initial restoration efforts is even further diminished and has largely gone unstudied. In this study, we examined the disposition of a cohort of defendants who underwent long-term competence restoration efforts (greater than six months) and identified factors related to whether these defendants were able to attain restoration and adjudicative success. Approximately two-thirds (n = 52) of the 81 individuals undergoing extended restoration efforts were eventually deemed restored to competence. Lengths of hospitalization until successful restoration are presented with implications for the reasonable length of time that restoration efforts should persist. Older individuals were less likely to be restored and successfully adjudicated, and individuals with more severe charges and greater factual legal understanding were more likely to be restored and adjudicated. The significance of these findings for courts and forensic clinicians is discussed.

  14. Hair restoration.

    Rawnsley, Jeffrey D

    2008-08-01

    The impact of male hair loss as a personal and social marker of aging is tremendous and its persistence as a human concern throughout recorded history places it in the forefront of male concern about the physical signs of aging. Restoration of the frontal hairline has the visual effect of re-establishing facial symmetry and turning back time. Follicular unit transplantation has revolutionized hair restoration, with its focus on redistributing large numbers of genetically stable hair to balding scalp in a natural distribution. Follicular unit hair restoration surgery is a powerful tool for the facial plastic surgeon in male aesthetic facial rejuvenation because it offers high-impact, natural-appearing results with minimal downtime and risk for adverse outcome.

  15. Fracture resistance of prepared premolars restored with bonded new lab composite and all-ceramic inlay/onlay restorations: Laboratory study.

    Wafaie, Ramy Ahmed; Ibrahim Ali, Ashraf; Mahmoud, Salah Hasab

    2018-01-25

    To assess the influence of new light curing lab composite, lithium-disilicate glass-ceramic and yttrium-stabilized zirconia-based ceramic on the fracture resistance of maxillary premolars with class II inlay and onlay preparations. Seventy sound maxillary premolars were divided randomly into seven main groups. The first group was left intact (control group). The remaining six groups were prepared with inlay and onlay cavities and restored with lab composite (SR Nexco), lithium-disilicate glass-ceramic (IPS e.max Press) and yttrium-stabilized zirconia-based ceramic (ICE Zirkon). The restorations were cemented with luting resin composite (Variolink N). All specimens were thermocycled 5000 cycles between 5°C ± 2°C and 55°C ± 2°C and were then cyclic loaded for 500 000 cycles. The specimens were subjected to a compressive load in a universal testing machine using a metal sphere until fracture occurred. The results were analyzed by 2-way ANOVA and Tukey HSD post hoc tests. The level of significance was set at P  .05). However, statistically significant differences were found among the means of control group and the groups restored with lab composite inlays, lab composite onlays, pressable glass ceramic inlays and pressable glass ceramic onlays (P lab composite is used. Conversely, when a ceramic material being used, the prepared teeth for inlay and onlay restorations showed a comparable strength to the intact teeth especially zirconia ceramic. Premolar teeth restored with zirconia ceramic inlays and onlays exhibited fracture resistance comparable to intact teeth. © 2018 Wiley Periodicals, Inc.

  16. Student Outcomes of Eco-Restoration Service-Learning Experiences in Urban Woodlands

    Knackmuhs, Eric; Farmer, James; Reynolds, Heather L.

    2017-01-01

    Service learning with ecological restoration projects can positively affect participants' attitudes, behaviors, and learning, but little is known about the longevity of these effects. Furthermore, urban green spaces are an understudied, yet increasingly important, context for eco-restoration service learning. This study examined the persistence of…

  17. Allometric equations for estimating tree biomass in restored mixed-species Atlantic Forest stands

    Lauro Rodrigues Nogueira; Vera Lex Engel; John A. Parrotta; Antonio Carlos Galvão de Melo; Danilo Scorzoni Ré

    2014-01-01

    Restoration of Atlantic Forests is receiving increasing attention because of its role in both biodiversity conservation and carbon sequestration for global climate change mitigation. This study was carried out in an Atlantic Forest restoration project in the south-central region of São Paulo State – Brazil to develop allometric equations to estimate tree biomass of...

  18. LHC related projects and studies - Part (II)

    Rossi, L.; De Maria, R.

    2012-01-01

    The session was devoted to address some aspects of the HL-LHC (High Luminosity LHC) project and explore ideas on new machines for the long term future. The session had two parts. The former focused on some of the key issues of the HL-LHC projects: beam current limits, evolution of the collimation system, research plans for the interaction region magnets and crab cavities. The latter explored the ideas for the long term future projects (LHeC and HE-LHC) and how the current research-development program for magnets and RF structures could fit in the envisaged scenarios

  19. The CUORE/CUORICINO project: preliminary studies

    Brofferio, C.

    2000-01-01

    A 1-t bolometer detector, aiming at the search for neutrinoless double-beta decay, cold dark matter, and solar axions with extremely high sensitivity, has been proposed (CUORE project). At the moment, the construction of a 420 kg array of 56 TeO 2 bolometers (CUORICINO project) has been approved and is financed. CUORICINO will be a feasibility test for CUORE, while increasing the present sensitivity on 0νββ half-life of 130 Te (1 x 10 23 yr, 90% C.L.) The scale of the art of CUORICINO, together with the physical motivations and the technical feasibility of the CUORE project are briefly discussed [ru

  20. The CUORE/CUORICINO project: Preliminary studies

    Brofferio, C.

    2000-01-01

    A 1-t bolometer detector, aiming at the search for neutrinoless double-beta decay, cold dark matter, and solar axions with extremely high sensitivity, has been proposed (CUORE project). At the moment, the construction of a 42-kg array of 56 TeO 2 bolometers (CUORICINO project) has been approved and is financed. CUORICINO will be a feasibility test for CUORE, while increasing the present sensitivity on 0νββ half-life of 130 Te (1 x 10 23 yr, 90% C.L.). The state of the art of CUORICINO, together with the physical motivations and the technical feasibility of the CUORE project, is briefly discussed

  1. Study of nanostructured clay's application in photoactivated restorative resins, used in dentistry

    Campos, Luiza Melo de Paiva

    2012-01-01

    The problem caused by polymerization shrinkage is critical, because the resin must remain closely in the tooth cavity while gaining rigidity and decrease its dimensions. Forcing the restorative material to distance or to separate the walls of the cavity, the resulting disruption would lead to microleakage, responsible for other problems such as secondary caries, postoperative soreness and may even cause pulpal changes. This process induces the volumetric change of the compound, given by the union of radicals in the formation of the macromolecule (polymer), causing a decrease in volume. This study aimed to develop new experimental composites through the addition of nano components clay minerals in a polymer matrix-based BisGMA / TEGDMA, to evaluate the possibility of a different dimensional behavior during the polymerization. Were used in this study, experimental composites added nanoparticle clay MMT Cloisite 10A (at concentrations of 50, 55, 60, 65 and 70 wt%) and Cloisite 30B (at concentrations of 50, 55, 60 and 65 wt%), which were then compared with the performance of the experimental composites added with micro-particles of silanized silica hybrid Aerosil OX-50 (at concentrations of 50, 60, 65 and 70 wt%). Was used the methods of characterization: Scanning Electron Microscopy (SEM), Thermal-Mechanical Analysis (TMA), Thermogravimetric Analysis (TGA), Differential Scanning Calorimetry (DSC), Absorption Spectroscopy in the Region of the Infrared (FTIR), X-ray Diffraction (XRD), Micro Hardness Knoop, Holographic Interferometry Technique (HIT), Digital Holography (DH), Correlation Image (CI) and Thermography. It was observed that the experimental composites with nanoparticles added clay Cloisite 10A and Cloisite 30B, performed better on tests that measured the polymerization shrinkage (TMA, HIT/HD/IC) and the micro hardness (Knoop), in relation to composites added with Silica Aerosil OX-50. These results may be related to the interaction polymer/clay and the nano

  2. Comparison of Micro-Leakage around Temporary Restorative Materials Placed in Complex Endodontic Access Cavities: An In-Vitro Study

    Adnan, S.; Khan, F. R.

    2016-01-01

    Objective: To compare mean micro-leakage around 3 types of temporary restorative materials in-vitro, when placed adjacent to permanent restorations (amalgam) in complex endodontic access cavities. Study Design: Randomized controlled trial. Place and Duration of Study: Dental Clinics, Dental Laboratory and Research Laboratory at The Aga Khan University Hospital, Karachi, from January to Jun 2014. Methodology: After random allocation of 60 teeth into 3 experimental groups, each group had conventional class II cavities prepared and amalgam placed. After 14 days, endodontic access cavities were made in these teeth, followed byplacement of Cavit, IRM and CLIP (depth of 4 mm each). After thermo-cycling and immersion in 0.5 percentage methylene blue dye, the teeth were sectioned mesio-distally and observed under stereoscopic microscope (magnification * 4) along 2 interfaces 'a' and 'b' (tooth-temporary restoration and temporary restoration-primary restoration), respectively. Depth of dye penetration was measured in millimeters. Results: IRM was leakiest at interface 'a', cavit had highest dye penetration at interface 'b', while CLIP exhibited least micro-leakage at 'a' and 'b'. The mean dye penetration for Cavit was 0.80 ± 0.23 mm at 'a', and 2.24 ± 0.48 mm at 'b'. For IRM, it was 1.82 ± 0.09 mm at 'a', and 0.44 ± 0.13 mm at 'b'. For CLIP, the mean dye penetration was 0.43 ± 0.05 mm at 'a', and 0.32 ± 0.12 mm at 'b'. The difference in dye penetration observed between the 3 groups at both interfaces was statistically significant. Conclusion: In a complex access cavity made adjacent to a pre-existing amalgam restoration, CLIP exhibits the least micro-leakage, followed by IRM and Cavit. (author)

  3. Project ATTACK and Project VISTA: Benchmark studies on the road to NATO's early TNF policy

    Garrity, P.J.

    1994-01-01

    This paper is concerned with those studies and analyses that affected early NATO nuclear policy and force structure. The discussion focuses specifically on two open-quotes benchmarkclose quotes activities. Project VISTA and Project ATTACK. These two studies were chosen less because one can document their direct impact on NATO nuclear policy and more because they capture the state of thinking about tactical nuclear weapons at a particular point of time. Project VISTA offers an especially important benchmark in this respect. Project ATTACK is a rather different kind of benchmark. It is not a pathbreaking study. It is much narrower and more technical than VISTA. It appears to have received no public attention. Project ATTACK is interesting because it seems to capture a open-quotes nuts-and-boltsclose quotes feel for how U.S. (and thereby NATO) theater nuclear policy was evolving prior to MC 48. The background and context for Project VISTA and Project ATTACK are presented and discussed

  4. Revitalization of Orlík Reservoir – case study of a regional restoration project

    Očásková, I.; Vrba, Jaroslav; Průša, L.

    2014-01-01

    Roč. 4, č. 1 (2014), s. 77-82 ISSN 1805-0174 Grant - others:GA MŠk(CZ) CZ.1.07/2.4.00/17.0130 Institutional support: RVO:60077344 Keywords : Vltava river basin * eutrophication * socio-economic transformation * regional governance * science-based sustainable strategy Subject RIV: DJ - Water Pollution ; Quality

  5. National Biomedical Tracer Facility: Project definition study

    Heaton, R.; Peterson, E.; Smith, P.

    1995-01-01

    The Los Alamos National Laboratory is an ideal institution and New Mexico is an ideal location for siting the National Biomedical Tracer Facility (NBTF). The essence of the Los Alamos proposal is the development of two complementary irradiation facilities that combined with our existing radiochemical processing hot cell facilities and waste handling and disposal facilities provide a low cost alternative to other proposals that seek to satisfy the objectives of the NBTF. We propose the construction of a 30 MeV cyclotron facility at the site of the radiochemical facilities, and the construction of a 100 MeV target station at LAMPF to satisfy the requirements and objectives of the NBTF. We do not require any modifications to our existing radiochemical processing hot cell facilities or our waste treatment and disposal facilities to accomplish the objectives of the NBTF. The total capital cost for the facility defined by the project definition study is $15.2 M. This cost estimate includes $9.9 M for the cyclotron and associated facility, $2.0 M for the 100 MeV target station at LAMPF, and $3.3 M for design

  6. National Biomedical Tracer Facility: Project definition study

    Heaton, R.; Peterson, E. [Los Alamos National Lab., NM (United States); Smith, P. [Smith (P.A.) Concepts and Designs (United States)

    1995-05-31

    The Los Alamos National Laboratory is an ideal institution and New Mexico is an ideal location for siting the National Biomedical Tracer Facility (NBTF). The essence of the Los Alamos proposal is the development of two complementary irradiation facilities that combined with our existing radiochemical processing hot cell facilities and waste handling and disposal facilities provide a low cost alternative to other proposals that seek to satisfy the objectives of the NBTF. We propose the construction of a 30 MeV cyclotron facility at the site of the radiochemical facilities, and the construction of a 100 MeV target station at LAMPF to satisfy the requirements and objectives of the NBTF. We do not require any modifications to our existing radiochemical processing hot cell facilities or our waste treatment and disposal facilities to accomplish the objectives of the NBTF. The total capital cost for the facility defined by the project definition study is $15.2 M. This cost estimate includes $9.9 M for the cyclotron and associated facility, $2.0 M for the 100 MeV target station at LAMPF, and $3.3 M for design.

  7. Contribuição da fauna silvestre em projetos de restauração ecológica no Brasil Contribution of the wildlife in ecological restoration projects in Brazil

    Wanuza Helena Campos

    2012-12-01

    Full Text Available O sucesso no processo de restauração e manutenção da dinâmica de um ecossistema é extremamente dependente da capacidade das espécies em promover interações interespecíficas entre as diversas formas de vida. Estas interações criam um cenário favorável à restauração ecológica de ecossistemas degradados. Assim, por meio de revisão de literatura, o objetivo deste trabalho é relatar a contribuição e utilização dos diferentes grupos de animais na execução de projetos de restauração ecológica no Brasil. As aves e mamíferos frugívoros e também outros animais, como os répteis, peixes e insetos, têm se destacado como ferramentas de auxílio aos projetos de restauração ecológica. As técnicas para atração de animais e consequente chegada de propágulos em um ecossistema degradado compreende a utilização de poleiros, que servem de pouso e abrigo para a avifauna e morcegos, e a utilização de abrigos artificiais, que servem para fuga de predadores, descanso e reprodução dos animais. De modo geral, estes estudos são excelentes ferramentas para gerir ações de manejo ambiental em ecossistemas degradados, possibilitando a recuperação da biodiversidade destes ambientes. The success in the process of restoration and maintenance of the dynamics of an ecosystem is highly dependent on the capacity of species to promote interspecific interactions among the various life forms. These interactions create a favorable environment for the ecological restoration of degraded ecosystems. Thus, by review the literature, the objective of this study is to report the contribution and use of different animal groups in carrying out ecological restoration projects in Brazil. The fruit-eating birds and mammals and also other animals such as reptiles, fish and insects have been highlighted as tools to aid environmental ecological restoration projects. Techniques for attracting animals and consequent arrival of seedlings in a degraded

  8. only: A Case Study In Projective Meaning

    Craige Roberts

    2010-01-01

    I offer an integrated theory of the meaning of only in which the prejacent, while not presupposed, is both entailed and backgrounded, hence tends to project (following a general proposal about projection due to Simons et al. 2010). Moreover, I argue, contra Beaver & Brady (2008), that only is not conventionally associated with focus, the focus effects arising instead pragmatically. But I do adopt aspects of their semantics for only, including the presupposition of a pre-order over the ele...

  9. Columbia Estuary Ecosystem Restoration Program: Restoration Design Challenges for Topographic Mounds, Channel Outlets, and Reed Canarygrass

    Diefenderfer, Heida L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Borde, Amy B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sinks, Ian A. [Columbia Land Trust, Vancouver, WA (United States); Cullinan, Valerie I. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-08-31

    The purpose of this study was to provide science-based information to practitioners and managers of restoration projects in the Columbia Estuary Ecosystem Restoration Program (CEERP) regarding aspects of restoration techniques that currently pose known challenges and uncertainties. The CEERP is a program of the Bonneville Power Administration (BPA) and the U.S. Army Corps of Engineers (Corps), Portland District, in collaboration with the National Marine Fisheries Service and five estuary sponsors implementing restoration. The estuary sponsors are Columbia Land Trust, Columbia River Estuary Study Taskforce, Cowlitz Tribe, Lower Columbia Estuary Partnership, and Washington Department of Fish and Wildlife. The scope of the research conducted during federal fiscal year 2015 included three aspects of hydrologic reconnection that were selected based on available scientific information and feedback from restoration practitioners during project reviews: the design of mounds (also called hummocks, peninsulas, or berms); the control of reed canarygrass (Phalaris arundinaceae); and aspects of channel network design related to habitat connectivity for juvenile salmonids.

  10. Effect of ecological restoration programs on dust concentrations in the North China Plain: a case study

    Long, Xin; Tie, Xuexi; Li, Guohui; Cao, Junji; Feng, Tian; Zhao, Shuyu; Xing, Li; An, Zhisheng

    2018-05-01

    In recent decades, the Chinese government has made a great effort in initiating large-scale ecological restoration programs (ERPs) to reduce the dust concentrations in China, especially for dust storm episodes. Using the Moderate Resolution Imaging Spectroradiometer (MODIS) land cover product, the ERP-induced land cover changes are quantitatively evaluated in this study. Two obvious vegetation protective barriers arise throughout China from the southwest to the northeast, which are well known as the Green Great Wall (GGW). Both the grass GGW and forest GGW are located between the dust source region (DSR) and the densely populated North China Plain (NCP). To assess the effect of ERPs on dust concentrations, a regional transport/dust model (WRF-DUST, Weather Research and Forecast model with dust) is applied to investigate the evolution of dust plumes during a strong dust storm episode from 2 to 8 March 2016. The WRF-DUST model generally performs reasonably well in reproducing the temporal variations and spatial distributions of near-surface [PMC] (mass concentration of particulate matter with aerodynamic diameter between 2.5 and 10 µm) during the dust storm event. Sensitivity experiments have indicated that the ERP-induced GGWs help to reduce the dust concentration in the NCP, especially in BTH (Beijing, Tianjin, and Hebei). When the dust storm is transported from the upwind DSR to the downwind NCP, the [PMC] reduction ranges from -5 to -15 % in the NCP, with a maximum reduction of -12.4 % (-19.2 µg m-3) in BTH and -7.6 % (-10.1 µg m-3) in the NCP. We find the dust plumes move up to the upper atmosphere and are transported from the upwind DSR to the downwind NCP, accompanied by dust decrease. During the episode, the forest GGW is nonsignificant in dust concentration control because it is of benefit for dry deposition and not for emission. Conversely, the grass GGW is beneficial in controlling dust erosion and is the dominant reason for [PMC] decrease in the NCP

  11. Effect of ecological restoration programs on dust concentrations in the North China Plain: a case study

    X. Long

    2018-05-01

    Full Text Available In recent decades, the Chinese government has made a great effort in initiating large-scale ecological restoration programs (ERPs to reduce the dust concentrations in China, especially for dust storm episodes. Using the Moderate Resolution Imaging Spectroradiometer (MODIS land cover product, the ERP-induced land cover changes are quantitatively evaluated in this study. Two obvious vegetation protective barriers arise throughout China from the southwest to the northeast, which are well known as the Green Great Wall (GGW. Both the grass GGW and forest GGW are located between the dust source region (DSR and the densely populated North China Plain (NCP. To assess the effect of ERPs on dust concentrations, a regional transport/dust model (WRF-DUST, Weather Research and Forecast model with dust is applied to investigate the evolution of dust plumes during a strong dust storm episode from 2 to 8 March 2016. The WRF-DUST model generally performs reasonably well in reproducing the temporal variations and spatial distributions of near-surface [PMC] (mass concentration of particulate matter with aerodynamic diameter between 2.5 and 10 µm during the dust storm event. Sensitivity experiments have indicated that the ERP-induced GGWs help to reduce the dust concentration in the NCP, especially in BTH (Beijing, Tianjin, and Hebei. When the dust storm is transported from the upwind DSR to the downwind NCP, the [PMC] reduction ranges from −5 to −15 % in the NCP, with a maximum reduction of −12.4 % (−19.2 µg m−3 in BTH and −7.6 % (−10.1 µg m−3 in the NCP. We find the dust plumes move up to the upper atmosphere and are transported from the upwind DSR to the downwind NCP, accompanied by dust decrease. During the episode, the forest GGW is nonsignificant in dust concentration control because it is of benefit for dry deposition and not for emission. Conversely, the grass GGW is beneficial in controlling dust erosion and is the

  12. Forest restoration at Redwood National Park: exploring prescribed fire alternatives to second-growth management: a case study

    Engber, Eamon; Teraoka, Jason; van Mantgem, Phillip J.

    2017-01-01

    Almost half of Redwood National Park is comprised of second-growth forests characterized by high stand density, deficient redwood composition, and low understory biodiversity. Typical structure of young redwood stands impedes the recovery of old-growth conditions, such as dominance of redwood (Sequoia sempervirens (D. Don) Endl.), distinct canopy layers and diverse understory vegetation. Young forests are commonly comprised of dense, even-aged Douglas-fir (Pseudotsuga menziesii (Mirb.) Franco) and redwood stump sprouts, with simple canopy structure and little understory development. Moreover, many of these young stands are believed to be vulnerable to disturbance in the form of drought, disease and fire. Silvicultural practices are increasingly being employed by conservation agencies to restore degraded forests throughout the coast redwood range; however, prescribed fire treatments are less common and potentially under-utilized as a restoration tool. We present an early synthesis from three separate management-scale prescribed fire projects at Redwood National Park spanning 1to 7 years post-treatment. Low intensity prescribed fire had minimal effect on overstory structure, with some mortality observed in trees smaller than 30 cm diameter. Moderate to high intensity fire may be required to reduce densities of larger Douglas-fir, the primary competitor of redwood in the Park’s second growth forests. Fine woody surface fuels fully recovered by 7 years post-burn, while recruitment of larger surface fuels was quite variable. Managers of coastal redwood ecosystems will benefit by having a variety of tools at their disposal for forest restoration and management.

  13. Marine Ecosystem Restoration in Changing European Seas

    Ounanian, Kristen; Delaney, Alyne; Carballo Cárdenas, Eira

    2017-01-01

    and using different narratives of marine restoration, and being confronted with different forms of uncertainties. The paper’s overall contribution is the synthesis of these seemingly disparate components (narratives of restoration, uncertainty in decision making, and governance arrangements) to evaluate...... the impact of existing (maritime and environmental) policies, the governance setting, definitions of restoration and uncertainties on the effectiveness of marine restoration projects. Such a synthesis is a necessary move toward a systematic evaluation of ways to govern and formally institutionalize marine...

  14. Spent nuclear fuel project design basis capacity study

    Cleveland, K.J.

    1996-09-09

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. Alternative configurations, sub-system cycle times, and operating scenarios were tested to identify their impact on total project duration and equipment requirements.

  15. Using Habitat Equivalency Analysis to Assess the Cost Effectiveness of Restoration Outcomes in Four Institutional Contexts

    Scemama, Pierre; Levrel, Harold

    2016-01-01

    At the national level, with a fixed amount of resources available for public investment in the restoration of biodiversity, it is difficult to prioritize alternative restoration projects. One way to do this is to assess the level of ecosystem services delivered by these projects and to compare them with their costs. The challenge is to derive a common unit of measurement for ecosystem services in order to compare projects which are carried out in different institutional contexts having different goals (application of environmental laws, management of natural reserves, etc.). This paper assesses the use of habitat equivalency analysis (HEA) as a tool to evaluate ecosystem services provided by restoration projects developed in different institutional contexts. This tool was initially developed to quantify the level of ecosystem services required to compensate for non-market impacts coming from accidental pollution in the US. In this paper, HEA is used to assess the cost effectiveness of several restoration projects in relation to different environmental policies, using case studies based in France. Four case studies were used: the creation of a market for wetlands, public acceptance of a port development project, the rehabilitation of marshes to mitigate nitrate loading to the sea, and the restoration of streams in a protected area. Our main conclusion is that HEA can provide a simple tool to clarify the objectives of restoration projects, to compare the cost and effectiveness of these projects, and to carry out trade-offs, without requiring significant amounts of human or technical resources.

  16. Restoring proximal caries lesions conservatively with tunnel restorations

    Chu CH

    2013-07-01

    Full Text Available Chun-Hung Chu1, May L Mei,1 Chloe Cheung,1 Romesh P Nalliah2 1Faculty of Dentistry, The University of Hong Kong, Hong Kong, People's Republic of China; 2Department of Restorative Dentistry and Biomaterials Sciences, Harvard School of Dental Medicine, Boston, MA, USA Abstract: The tunnel restoration has been suggested as a conservative alternative to the conventional box preparation for treating proximal caries. The main advantage of tunnel restoration over the conventional box or slot preparation includes being more conservative and increasing tooth integrity and strength by preserving the marginal ridge. However, tunnel restoration is technique-sensitive and can be particularly challenging for inexperienced restorative dentists. Recent advances in technology, such as the contemporary design of dental handpieces with advanced light-emitting diode (LED and handheld comfort, offer operative dentists better vision, illumination, and maneuverability. The use of magnifying loupes also enhances the visibility of the preparation. The advent of digital radiographic imaging has improved dental imaging and reduced radiation. The new generation of restorative materials has improved mechanical properties. Tunnel restoration can be an option to restore proximal caries if the dentist performs proper case selection and pays attention to the details of the restorative procedures. This paper describes the clinical technique of tunnel restoration and reviews the studies of tunnel restorations. Keywords: operative, practice, tunnel preparation, composite, amalgam, glass ionomer

  17. Transparent Restoration

    Barou, L.; Bristogianni, T.; Oikonomopoulou, F.

    2017-01-01

    This paper investigates the application of structural glass in restoration and conservation practices in order to highlight and safeguard our built heritage. Cast glass masonry is introduced in order to consolidate a half-ruined historic tower in Greece, by replacing the original parts of the façade

  18. Restorative neuroscience

    Andres, Robert H; Meyer, Morten; Ducray, Angélique D

    2008-01-01

    There is increasing interest in the search for therapeutic options for diseases and injuries of the central nervous system (CNS), for which currently no effective treatment strategies are available. Replacement of damaged cells and restoration of function can be accomplished by transplantation of...

  19. Environmental Restoration

    Zeevaert, T.; Vanmarcke, H

    1998-07-01

    The objectives of SCK-CEN's programme on environmental restoration are (1) to optimize and validate models for the impact assessment from environmental, radioactive contaminations, including waste disposal or discharge; (2) to support the policy of national authorities for public health and radioactive waste management. Progress and achievements in 1997 are reported.

  20. Restoration of ailing wetlands.

    Oswald J Schmitz

    2012-01-01

    Full Text Available It is widely held that humankind's destructive tendencies when exploiting natural resources leads to irreparable harm to the environment. Yet, this thinking runs counter to evidence that many ecological systems damaged by severe natural environmental disturbances (e.g., hurricanes can restore themselves via processes of natural recovery. The emerging field of restoration ecology is capitalizing on the natural restorative tendencies of ecological systems to build a science of repairing the harm inflicted by humans on natural environment. Evidence for this, for example, comes from a new meta-analysis of 124 studies that synthesizes recovery of impacted wetlands worldwide. While it may take up to two human generations to see full recovery, there is promise, given human will, to restore many damaged wetlands worldwide.