WorldWideScience

Sample records for response planning guidelines

  1. EM Health and Safety Plan Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This document contains information about the Health and Safety Plan Guidelines. Topics discussed include: Regulatory framework; key personnel; hazard assessment; training requirements; personal protective equipment; extreme temperature disorders or conditions; medical surveillance; exposure monitoring/air sampling; site control; decontamination; emergency response/contingency plan; emergency action plan; confined space entry; and spill containment.

  2. Innovations in emergency response plans : making the useful application of the 2007 CDA guidelines for emergency response plans

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, A.J. [Columbia Power Corp., Castlegar, BC (Canada)

    2008-07-01

    Columbia Power Corporation (CPC) changed its perspective and approach to emergency response plans (ERP) between 2002 and 2007 from one of administrative necessity to one of important functional reference. The new 2007 Canadian Dam Association Guidelines helped facilitate that transition for both CPC and all dam owners. As part of the licensing requirements for its new facility, CPC had an ERP commissioned and developed in 2002. A potential dam safety event occurred in 2004, which necessitated the need for the ERP to be put to use. However, at the time, it was found to be lacking in functionality for field personnel. As a result, CPC recognized the significance of having a functional ERP for field staff and undertook a substantial redraft between 2005 and 2007. This paper discussed the development of the ERP with particular reference to assessing the top potential emergency scenarios for the facility; development of response plans for the identified scenarios; a flow chart to guide personnel through the required actions; response checklist; detailed inspection checklists and any required forms, photos or specific information. It was concluded that the new ERP has been well received and has improved facility awareness and emergency preparedness. 1 ref., 2 figs.

  3. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    Science.gov (United States)

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  4. Development of urban planning guidelines for improving emergency response capacities in seismic areas of Iran.

    Science.gov (United States)

    Hosseini, Kambod Amini; Jafari, Mohammad Kazem; Hosseini, Maziar; Mansouri, Babak; Hosseinioon, Solmaz

    2009-10-01

    This paper presents the results of research carried out to improve emergency response activities in earthquake-prone areas of Iran. The research concentrated on emergency response operations, emergency medical care, emergency transportation, and evacuation-the most important issues after an earthquake with regard to saving the lives of victims. For each topic, some guidelines and criteria are presented for enhancing emergency response activities, based on evaluations of experience of strong earthquakes that have occurred over the past two decades in Iran, notably Manjil (1990), Bam (2003), Firouz Abad-Kojour (2004), Zarand (2005) and Broujerd (2006). These guidelines and criteria are applicable to other national contexts, especially countries with similar seismic and social conditions as Iran. The results of this study should be incorporated into comprehensive plans to ensure sustainable development or reconstruction of cities as well as to augment the efficiency of emergency response after an earthquake.

  5. Planning new basic guideline to the radiological risk. Content, radiological criteria and implementation

    International Nuclear Information System (INIS)

    Calvin Cuartero, M.; Vega Riber, R. de la; Martin Calvarro, J. M.

    2011-01-01

    The most important aspects of the Basic Guideline focus on their area of planning, groups of potential radiological emergencies in the type of activity associated with the levels of response planning and responsible organizations, structure and functions for each level, radiological criteria, implementation and maintenance of the effectiveness of the level of response plans abroad.

  6. Effective operational oil spill response planning

    International Nuclear Information System (INIS)

    Meyers, R.J.

    1991-01-01

    An operational Contingency Plan is one of the single most important aspects of effective oil spill response operations. It is a spill control game plan. A thorough contingency plan provides a set of guidelines that can be used to help direct all phases of spill response activities. More than simple a compilation of lists and rosters, the contingency plan reflects strategic and philosophical elements of spill response that help to ensure a viable response to any spill incident. Facilities and oil carrying vessels should have well maintained contingency plans with these features. This paper describes the requirement for effective oil spill response pans and the training required to exercise them

  7. Failed fuel action plan guidelines: Special report

    International Nuclear Information System (INIS)

    1987-11-01

    The objective of this document is to provide a generic guideline that can be used to formulate a failed fuel action plan (FFAP) for specific application by a utility. This document is intended to be part of a comprehensive fuel reliability monitoring, management, and improvement program. The utilities may utilize this document as one resource in developing a failed fuel action plan. This document is not intended to be used as a failed fuel action plan standard. This document is intended to provide guidance on: management responsibilities; fuel performance parameters; cost/benefit analysis; action levels; long-term improvement methods; and data collection, analysis, and trending. 3 refs., 4 figs., 6 tabs

  8. No. 354-Canadian HIV Pregnancy Planning Guidelines.

    Science.gov (United States)

    Loutfy, Mona; Kennedy, V Logan; Poliquin, Vanessa; Dzineku, Frederick; Dean, Nicola L; Margolese, Shari; Symington, Alison; Money, Deborah M; Hamilton, Scot; Conway, Tracey; Khan, Sarah; Yudin, Mark H

    2018-01-01

    The objective of the Canadian HIV Pregnancy Planning Guidelines is to provide clinical information and recommendations for health care providers to assist Canadians affected by HIV with their fertility, preconception, and pregnancy planning decisions. These guidelines are evidence- and community-based and flexible and take into account diverse and intersecting local/population needs based on the social determinants of health. EVIDENCE: Literature searches were conducted by a librarian using the Medline, Cochrane Central Register of Controlled Trials (CENTRAL), and Embase databases for published articles in English and French related to HIV and pregnancy and HIV and pregnancy planning for each section of the guidelines. The full search strategy is available upon request. The evidence obtained was reviewed and evaluated by the Infectious Diseases Committee of the SOGC under the leadership of the principal authors, and recommendations were made according to the guidelines developed by the Canadian Task Force on Preventive Health Care and through use of the Appraisal of Guidelines Research and Evaluation instrument for the development of clinical guidelines. Guideline implementation should assist the practitioner in developing an evidence-based approach for the prevention of unplanned pregnancy, preconception, fertility, and pregnancy planning counselling in the context of HIV infection. These guidelines have been reviewed and approved by the Infectious Disease Committee and the Executive and Council of the SOGC. Canadian Institutes of Health Research Grant Planning and Dissemination grant (Funding Reference # 137186), which funded a Development Team meeting in 2016. Crown Copyright © 2018. Published by Elsevier Inc. All rights reserved.

  9. 7 CFR 611.10 - Standards, guidelines, and plans.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Standards, guidelines, and plans. 611.10 Section 611... § 611.10 Standards, guidelines, and plans. (a) NRCS conducts soil surveys under national standards and guidelines for naming, classifying, and interpreting soils and for disseminating soil survey information. (b...

  10. Societal Planning: Identifying a New Role for the Transport Planner-Part II: Planning Guidelines

    DEFF Research Database (Denmark)

    Khisty, C. Jotin; Leleur, Steen

    1997-01-01

    The paper seeks to formulate planning guidelines based on Habermas's theory of communicative action. Specifically, this has led to the formulation of a set of four planning validity claims concerned to four types of planning guidelines concerning adequacy, dependency, suitability and adaptability......-a-vis the planning validity claims. Among other things the contingency of this process is outlined. It is concluded (part I & II) that transport planners can conveniently utilize the guidelines in their professional practice, tailored to their particular settings....

  11. Applying international standards and guidelines on corporate social responsibility: An action plan

    NARCIS (Netherlands)

    Cramer, J.M.

    2005-01-01

    How can a company start the process of corporate social responsibility in an international context, thereby makinge use of diverse standards and guidelines? This question immediately came to the fore emerged after the start of the programme ‘Corporate social responsibility in international context’

  12. Plans to adapt Point Lepreau ageing management to new industry guidelines

    International Nuclear Information System (INIS)

    Greenlaw, G.; Gendron, T.; Slade, J.; Rankin, B.

    2008-01-01

    In preparation for PLGS life extension, NBPN spent considerable effort to evaluate the impact of ageing and to develop ageing management processes to maintain the required safety functions for extended operation. These were based on INPO AP-913. Recently, the CNSC has been developing Canadian ageing management guidelines in line with the IAEA approach. In response, NBPN plans to document how current PLGS processes meet the new CNSC guidelines and to identify any areas for improvement. Best practices from utilities that have retrofitted IAEA guidelines and PLGS experience in applying risk-based methods for ageing management will be used to implement improvements. (author)

  13. Sandia software guidelines: Software quality planning

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This volume is one in a series of Sandia Software Guidelines intended for use in producing quality software within Sandia National Laboratories. In consonance with the IEEE Standard for Software Quality Assurance Plans, this volume identifies procedures to follow in producing a Software Quality Assurance Plan for an organization or a project, and provides an example project SQA plan. 2 figs., 4 tabs.

  14. Operating Plan and Guidelines (2011 - 2016)

    International Nuclear Information System (INIS)

    2011-01-01

    The Committee on Nuclear Regulatory Activities (CNRA) of the OECD Nuclear Energy Agency (NEA) is an international committee made up primarily of senior nuclear regulators. It was established in 1989 as a forum for the exchange of information and experience among regulatory organisations and for the review of developments which could affect regulatory requirements. The Committee is responsible for the programme of the NEA, concerning the regulation, licensing and inspection of nuclear installations. In particular, the Committee reviews current practices and operating experience. The Joint CSNI/CNRA Strategic Plan states that: The Operating Plan for each committee aligns with the Joint CNRA/ CSNI Strategic Plan. The Committee's Operating Plans describes each Committee's organisation, priorities, and operating procedures to be used in fulfilling their mandates in accordance with this strategic plan. Specific attention will be given to ensure that cross-cutting issues are satisfactorily dealt with. This report represents such an operating plan. The intention is that it should fit onto a new third rung on the ladder representing the hierarchy of documents that govern the work of CNRA. At the top of this hierarchy is the Strategic Plan of the NEA; immediately below that is the Joint CSNI/CNRA Strategic Plan; followed by the new operating plan and the guidelines for methods of work. This plan sets the basis for establishing the current CNRA Programme of Work. Since the issuance of the last plan in 2007 there has been a significant shift and many member countries are now constructing new facilities or in the process of legislative or technical processing for new licenses. This comes along in an atmosphere in which current operating plants requesting power up-rates, extended licenses, and substantial activity in new licensing and new construction. It is clear that all these activities require similar attention from the regulators and operators, and the responsibilities

  15. RANET technical guidelines: Interim technical guidelines for national assistance capabilities. Emergency preparedness and response. Date effective: 1 January 2007

    International Nuclear Information System (INIS)

    2006-12-01

    The publication is issued as an attachment to EPR-RANET (2006) and has the same status. It provides administrative and technical guidelines for National Assistance Capabilities and enters into effect on 1 January 2007. Additional technical guidelines are under development by assistance work group under international Action Plan for Strengthening the International Preparedness and Response System for Nuclear and Radiological Emergencies. As these are finalised they will be included in this document

  16. The importance of socially responsible strategic planning

    Science.gov (United States)

    Štrukelj, Tjaša

    2017-10-01

    This paper researches the importance of social responsible strategic planning regardless of the sector and shows research results on the case example of the selected tourism sector, which has economic and employment potential and social and environmental implications. Tourism sector is closely interdependent with transport sector and influences it. Therefore, the more we develop the tourism sector, the more the transport sector is developing as well. Based on Mulej’s Dialectical Systems Theory (DST) we found out that enterprises should integrate sustainability and social responsibility into their strategic planning if they want the Earth to survive. This urged the European Union, ISO International Standards Organization, many other organisations and many researchers. To make strategic planning socially responsible, enterprise’s governors should request social responsibility in business policy, which represents their governance guidelines and is implemented through the strategies set up by top managers and realised in the basic realisation process - their business operations.

  17. PREPARE: guidelines for planning animal research and testing.

    Science.gov (United States)

    Smith, Adrian J; Clutton, R Eddie; Lilley, Elliot; Hansen, Kristine E Aa; Brattelid, Trond

    2018-04-01

    There is widespread concern about the quality, reproducibility and translatability of studies involving research animals. Although there are a number of reporting guidelines available, there is very little overarching guidance on how to plan animal experiments, despite the fact that this is the logical place to start ensuring quality. In this paper we present the PREPARE guidelines: Planning Research and Experimental Procedures on Animals: Recommendations for Excellence. PREPARE covers the three broad areas which determine the quality of the preparation for animal studies: formulation, dialogue between scientists and the animal facility, and quality control of the various components in the study. Some topics overlap and the PREPARE checklist should be adapted to suit specific needs, for example in field research. Advice on use of the checklist is available on the Norecopa website, with links to guidelines for animal research and testing, at https://norecopa.no/PREPARE .

  18. Serving our communities better. Guidelines for planning and developing integrated delivery networks.

    Science.gov (United States)

    Prybil, L; Golden, P; Ballance, X

    1995-04-01

    In 1994 the Daughters of Charity National Health System-East Central (DCNHS-East Central) adopted 11 guidelines to help corporate staff and local leaders plan and develop integrated networks. Guideline 1 emphasizes needs-based strategic planning. Guideline 2 focuses on the community-based network planning process, recommending a team approach and ongoing communication with the local ordinary. In guidelines 3 through 5, the DCNHS-East Central Board of Directors spells out key issues that must be covered in proposals ultimately presented for governance action. Guideline 6 presents three core elements that should characterize all CBNs in which DCNHS-East Central institutions participate. Guideline 7 emphasizes that all CBN proposals and agreements must be clear with respect to the Catholic identity of DCNHS-East Central institutions. Guidelines 8 and 9 require that proposed changes to traditional policies and management practices be explicit in CBN proposals. The tenth guideline requires that all CBN proposals indicate an explicit evaluation function. The final guideline underscores that regardless of the strategic fit or how well a CBN is designed, it is unlikely to succeed unless both internal and external relationships are based on a solid foundation of honesty, mutual respect, and trust.

  19. APA guidelines: their importance and a plan to keep them current: 2013 annual report of the Policy and Planning Board.

    Science.gov (United States)

    2014-01-01

    When guidelines are approved by APA, they become association policy, and it is imperative that they remain current. The revision of guidelines poses several challenges to the association. These challenges range from the availability and allocation of resources to support the complicated processes involved in developing and updating these policies to the lack of a clearly defined process that includes identification of tasks, assignments of responsibilities, and so forth. For this reason, the APA Board of Directors asked the Policy and Planning Board (P&P) to work with the boards of the four directorates (i.e., the Education Directorate, the Practice Directorate, the Public Interest Directorate, and the Science Directorate) to create a proposal that would (a) make recommendations with regard to how the review and revision of guidelines documents might best be accomplished in accordance with the APA Strategic Plan and existing policies and procedures and (b) make suggestions regarding the association resources that might be required. The Board of Directors approved the proposed review process in December 2013. 2014 APA, all rights reserved

  20. Field assessment of a model tuberculosis outbreak response plan for low-incidence areas

    Directory of Open Access Journals (Sweden)

    Pascopella Lisa

    2007-10-01

    Full Text Available Abstract Background For a regional project in four low-incidence states, we designed a customizable tuberculosis outbreak response plan. Prior to dissemination of the plan, a tuberculosis outbreak occurred, presenting an opportunity to perform a field assessment of the plan. The purpose of the assessment was to ensure that the plan included essential elements to help public health professionals recognize and respond to outbreaks. Methods We designed a semi-structured questionnaire and interviewed all key stakeholders involved in the response. We used common themes to assess validity of and identify gaps in the plan. A subset of participants provided structured feedback on the plan. Results We interviewed 11 public health and six community stakeholders. The assessment demonstrated that (1 almost all of the main response activities were reflected in the plan; (2 the plan added value by providing a definition of a tuberculosis outbreak and guidelines for communication and evaluation. These were areas that lacked written protocols during the actual outbreak response; and (3 basic education about tuberculosis and the interpretation and use of genotyping data were important needs. Stakeholders also suggested adding to the plan questions for evaluation and a section for specific steps to take when an outbreak is suspected. Conclusion An interactive field assessment of a programmatic tool revealed the value of a systematic outbreak response plan with a standard definition of a tuberculosis outbreak, guidelines for communication and evaluation, and response steps. The assessment highlighted the importance of education and training for tuberculosis in low-incidence areas.

  1. nestor Guideline for Preservation Planning – a Process Model

    Directory of Open Access Journals (Sweden)

    Sabine Schrimpf

    2014-02-01

    Full Text Available The nestor guideline for preservation planning is the latest in a series of nestor publications. nestor is the German competence network for digital preservation and it offers all interested parties from the private and public domains the possibility to participate in working groups. The guideline for preservation planning is the result of such a working group, which discussed the conceptual and practical issues of implementing the OAIS Functional Entity “Preservation Planning”.The guideline describes a process model and offers some guidance on potential implementations. It integrates and builds on recognized community concepts like Significant Properties, the OAIS Designated Community, the National Archives of Australia’s Performance Model, the PREMIS concept of Intellectual Entities and Representations, and the PLANET’s approach to preservation planning. Furthermore, it introduces the concepts “intended use” (Nutzungsziele, “information type” (Informationstyp and “preservation group” (Erhaltungsgruppe. The purpose of these new categories is that information objects shall be grouped by information type (e.g., audio, video, text… and intended use (e.g., reading for pleasure, search for specific information… to preservation groups for automatic processing. Significant properties can then be derived for whole preservation groups. The file format alone is considered as not completely sufficient for such categorisation. Some exemplary implementation solutions of the new concepts are presented in an annex.The guideline takes into account that resources for preservation planning and preservation actions are limited and has therefore adopted 4 premises: adequacy, financial viability, automation, and authenticity of archived objects. Its pragmatic approach becomes apparent in the definition and explanation of these dimensions. The guideline is written from the point of view of representatives of memory institutions, i

  2. National planning guidelines for environment ally sustainable development in Scotland and lessons learnt for Pakistan

    International Nuclear Information System (INIS)

    Qamar-ul-Islam; Anjum, G.A.; Shahzad, M.

    2005-01-01

    This piece of research work reflects the researcher's academic as well as the practical experiences of Scottish planning about the concept, issues and policy formulations. It is in the context of National Planning Policy Guidelines, originated in Scotland with particular reference to it's Fife Region. The first part reflects the general overview of Scotland followed by brief description of the region. Another part deals with the existing strategic issues in the region which are related to land and the environment notably rural planning priorities, agricultural scarce land, conservation of recreational and tourist areas, forest land potentials, landscape resources, national scenic areas, petro-chemical, industrial zones, river pollution and future land use for housing. This study has suggested National Planning Policy Guidelines to these issues. Last section deals with the lessons learnt from Scotland and appropriate application of these guidelines in case of Pakistan. The establishment of the relevant National Planning Guidelines according to our local environmental and socio-economic conditions can also play a significant role to safe guard our rural and urban landscapes and their respective environments. These broad guidelines must therefore be recommended in the broader spectrum in spatial linkage. Moreover these guidelines must therefore synthesize and articulated specifically at structure plans, master plans at district, sub district or local plans and planning processes which can lead Pakistan towards environmentally sustainable development. (author)

  3. Guidelines and workbook for assessment of organization and administration of utilities seeking operating license for a nuclear power plant. Guidelines for utility organization and administration plan. Volume 1, Revision 1

    International Nuclear Information System (INIS)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1986-09-01

    Volumes 1 and 2 of this report are a partial response to the requirements of Item I.B.1.1 of the ''NRC Action Plan Developed as a Result of the TMI-2 Accident,'' NUREG-0660, and are designed to serve as a basis for replacing the earlier NUREG-0731, ''Guidelines for Utility Management Structure and Technical Resources.'' These Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The purpose of the Workbook (Vol. 2) is to guide the NRC reviewer through a systematic review and assessment of a proposed organization and administration. It is the NRC's intention to incorporate these Guidelines and Workbook into a future revision of the Standard Review Plan (SRP), NUREG-0800. However, at this time the report is being published so that the material may be used on a voluntary basis by industry to systematically prepare or evaluate their organization or administration plans. Use of the report by the NRC would not occur until after it has been incorpoarted in the SRP

  4. Planning new basic guideline to the radiological risk. Content, radiological criteria and implementation; Nueva direcctriz basica de planificacion ante el riesgo radiologico. Contenido, criterio radiologicos e implantacion

    Energy Technology Data Exchange (ETDEWEB)

    Calvin Cuartero, M.; Vega Riber, R. de la; Martin Calvarro, J. M.

    2011-07-01

    The most important aspects of the Basic Guideline focus on their area of planning, groups of potential radiological emergencies in the type of activity associated with the levels of response planning and responsible organizations, structure and functions for each level, radiological criteria, implementation and maintenance of the effectiveness of the level of response plans abroad.

  5. Developing a highway emergency response plan for incidents involving hazardous materials, second edition, March 1992

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This provides minimum guidelines for developing an emergency response plan for incidents involving hazardous liquid hydrocarbons, such as gasoline and crude oil, transported in MC 306/DOT 406 and MC 307/DOT 407 aluminum cargo tanks and for coordinating and cooperating with local, state, and federal officials. This publication covers response plan priorities, personnel training, special equipment, media relations, environmental relations, and post-response activities. The apprendixes to this recommended practice outline a highway emergency response plan and suggest a procedure for removing liquid hydrocarbons from overturned cargo tanks and righting the tank vehicles

  6. Guidelines for the review of state ITS/CVO business plans

    Science.gov (United States)

    1997-08-01

    This document provides guidelines for the review of state ITS/CVO business plans by the FHWA. The purpose of the review is to ensure that the state business plans have been developed in a manner consistent with the FHWAs intent in awarding ITS/CVO...

  7. Guidelines and criteria for planning Slovenian settlements

    Directory of Open Access Journals (Sweden)

    Andrej Pogačnik

    2001-01-01

    Full Text Available The article deals with proposals for directing settlement development and management in Slovenia on the national level. They should be integrated in the spatial order, a part of the national spatial plan. First a short chronology of research with similar topics and simultaneous critical analysis is presented. The methodology and possible models for structuring directives is elaborated. Based on recent research by domestic authors, European guidelines and own ideas, a manual was devised, dividing guidelines hierarchically between the national, regional and local level. The second part or rather different type of text attached to the manual is a glossary. It also includes an index for further research of various sources.

  8. Preliminary report on operational guidelines developed for use in emergency preparedness and response to a radiological dispersal device incident.

    Energy Technology Data Exchange (ETDEWEB)

    Yu, C.; Cheng, J.-J.; Kamboj, S.; Domotor, S.; Wallo, A.; Environmental Science Division; DOE

    2006-12-15

    This report presents preliminary operational guidelines and supporting work products developed through the interagency Operational Guidelines Task Group (OGT). The report consolidates preliminary operational guidelines, all ancillary work products, and a companion software tool that facilitates their implementation into one reference source document. The report is intended for interim use and comment and provides the foundation for fostering future reviews of the operational guidelines and their implementation within emergency preparedness and response initiatives in the event of a radiological dispersal device (RDD) incident. The report principally focuses on the technical derivation and presentation of the operational guidelines. End-user guidance providing more details on how to apply these operational guidelines within planning and response settings is being considered and developed elsewhere. The preliminary operational guidelines are categorized into seven groups on the basis of their intended application within early, intermediate, and long-term recovery phases of emergency response. We anticipate that these operational guidelines will be updated and refined by interested government agencies in response to comments and lessons learned from their review, consideration, and trial application. This review, comment, and trial application process will facilitate the selection of a final set of operational guidelines that may be more or less inclusive of the preliminary operational guidelines presented in this report. These and updated versions of the operational guidelines will be made available through the OGT public Web site (http://ogcms.energy.gov) as they become finalized for public distribution and comment.

  9. Considering wind energy in regional planning guidelines and communal land-use planning; Die Beruecksichtigung der Windenergie in der Richt- und Nutzungsplanung

    Energy Technology Data Exchange (ETDEWEB)

    Soguel, R. [Atelier North and Robyr, Neuchatel (Switzerland); Henz, H.R. [Metron Raumplanung AG, Brugg (Switzerland)

    2001-07-01

    This report made for the Swiss Federal Office of Energy (SFOE) discusses the situation in Switzerland regarding the planning guidelines required at regional and communal level that are required for the granting of permission to build wind energy installations. Various types of wind turbines and wind farms are described and topics such as planning tools, landscape protection and promotional concepts are discussed. The role of the Swiss Cantons in the promotion of wind energy is examined and the question of how to integrate wind energy plant into cantonal and communal planning guidelines is looked at. This working guide introduces two schemes that demonstrate how the planning process for the construction of wind farms can be co-ordinated with the development of land-use plans. Examples of current cantonal guidelines are presented in the appendix to the report.

  10. Developing team leadership to facilitate guideline utilization: planning and evaluating a 3-month intervention strategy.

    Science.gov (United States)

    Gifford, Wendy; Davies, Barbara; Tourangeau, Ann; Lefebre, Nancy

    2011-01-01

    Research describes leadership as important to guideline use. Yet interventions to develop current and future leaders for this purpose are not well understood. To describe the planning and evaluation of a leadership intervention to facilitate nurses' use of guideline recommendations for diabetic foot ulcers in home health care. Planning the intervention involved a synthesis of theory and research (qualitative interviews and chart audits). One workshop and three follow-up teleconferences were delivered at two sites to nurse managers and clinical leaders (n=15) responsible for 180 staff nurses. Evaluation involved workshop surveys and interviews. Highest rated intervention components (four-point scale) were: identification of target indicators (mean 3.7), and development of a team leadership action plan (mean 3.5). Pre-workshop barriers assessment rated lowest (mean 2.9). Three months later participants indicated their leadership performance had changed as a result of the intervention, being more engaged with staff and clear about implementation goals. Creating a team leadership action plan to operationalize leadership behaviours can help in delivery of evidence-informed care. Access to clinical data and understanding team leadership knowledge and skills prior to formal training will assist nursing management in tailoring intervention strategies to identify needs and gaps. © 2010 The Authors. Journal compilation © 2010 Blackwell Publishing Ltd.

  11. British Columbia inland oil spill response plan

    International Nuclear Information System (INIS)

    2005-01-01

    This paper presents an outline of the organization, procedures and duties of the provincial government in response to inland oil spills stemming from pipeline or tank-farm rupture, train derailment and vehicle accidents in British Columbia. Provincial response strategies were reviewed, along with their relationships to various policies and standards. Public, infrastructure and environmental protection were identified as key factors. Incident notification procedures were detailed, including outlines of roles, event criteria and call for incident management teams. Agreements and cost recovery issues were examined. The characteristics of site response were reviewed, including details of communications, tactical planning, and unified command among local and federal governments. The role of First Nations and responsible parties was also addressed. Details of shore cleanup, wildlife rescue, decontamination, and waste handling strategies were presented. The organization, missions and duties for an incident management team were outlined, along with a summary of operational guidelines and information on team positions and the establishment of joint information centres. The involvement of cooperating agencies was examined. An incident command system was also presented, including details of planning, operations, logistics, and organization. A checklist of individual duties was provided, with details of responsibilities, safety issues and general instructions for all team members. tabs., figs

  12. Canadian HIV Pregnancy Planning Guidelines: No. 278, June 2012.

    Science.gov (United States)

    Loutfy, Mona R; Margolese, Shari; Money, Deborah M; Gysler, Mathias; Hamilton, Scot; Yudin, Mark H

    2012-10-01

    Four main clinical issues need to be considered for HIV-positive individuals and couples with respect to pregnancy planning and counselling: (1) pre-conceptional health; (2) transmission from mother to infant, which has been significantly reduced by combined antiretroviral therapy; (3) transmission between partners during conception, which requires different prevention and treatment strategies depending on the status and needs of those involved; and (4) management of infertility issues. The objective of the Canadian HIV Pregnancy Planning Guidelines is to provide clinical information and recommendations for health care providers to assist HIV-positive individuals and couples with their fertility and pregnancy planning decisions. These guidelines are evidence- and community-based and flexible, and they take into account diverse and intersecting local/population needs and the social determinants of health. Intended outcomes are (1) reduction of risk of vertical transmission and horizontal transmission of HIV, (2) improvement of maternal and infant health outcomes in the presence of HIV, (3) reduction of the stigma associated with pregnancy and HIV, and (4) increased access to pregnancy planning and fertility services. PubMed and Medline were searched for articles published in English or French to December 20, 2010, using the following terms: "HIV" and "pregnancy" or "pregnancy planning" or "fertility" or "reproduction" or "infertility" or "parenthood" or "insemination" or "artificial insemination" or "sperm washing" or "IVF" or "ICSI" or "IUI." Other search terms included "HIV" and 'horizontal transmission" or "sexual transmission" or "serodiscordant." The following conference databases were also searched: Conference on Retroviruses and Opportunistic Infections, International AIDS Conference, International AIDS Society, Interscience Conference on Antimicrobial Agents and Chemotherapy, the Canadian Association of HIV/AIDS Research, and the Ontario HIV Treatment

  13. Are there national strategies, plans and guidelines for the treatment of hepatitis C in people who inject drugs?

    DEFF Research Database (Denmark)

    Maticic, Mojca; Videcnik Zorman, Jerneja; Gregorcic, Sergeja

    2014-01-01

    . RESULTS: All of the 33 invited European countries participated in the survey. Twenty-two responses came from non-governmental organizations, six from public health institutions, four from university institutions and one was an independent consultant. Fourteen (42.4%) of the countries reported having...... have been included in the international guidelines for the treatment of HCV infection. The aim of this survey was to collect data from European countries on the existence of national strategies, action plans and clinical guidelines for HCV treatment in the general population and PWID in particular...

  14. Transformation Planning of Ecotourism Systems to Invigorate Responsible Tourism

    Directory of Open Access Journals (Sweden)

    Yun Eui Choi

    2017-12-01

    Full Text Available The purpose of this study is to introduce transformation plans that can stimulate responsible ecotourism by using systems thinking to solve ecotourism problems in Korea. Systems thinking is a research method used to understand the operating mechanisms of the variables that influence an entire system, in order to identify its problems. The four types of ecotourism systems are classified as follows: low-infrastructure and resident-initiated, high-infrastructure and resident-initiated, high-infrastructure and government-initiated and low-infrastructure and government-initiated. These systems vary based on the need for tourism facilities and the form of governance. Each type of system is analyzed using the systems thinking process (dynamic thinking, causal thinking, feedback thinking, strategic thinking at representative ecotourism sites in Jeollanam-do and the following transformation plans are proposed to improve the responsibility at the tourism sites: First, local residents will develop a system to manage and operate ecotourism ventures and establish cooperative governance structures to strengthen the local capacity. Second, ecotourism operators will improve the quality of their educational and interpretative programs and tourist information platforms in order to raise awareness of the responsibilities of ecotourists. Third, ecotourism systems that are improved through ecotourists’ and tour operators' heightened senses of responsibility can sustain ecotourism independently. These transformation plans can be applied to policy proposals for revitalizing ecotourism, to guidelines for improving community resilience and to biological habitat protection plans. This study is meaningful in that it discusses the role of stakeholders in ecotourism planning and promoting responsible tourism and their role in utilizing and conserving natural resources accordingly.

  15. Policy guidelines for collective bargaining and family planning.

    Science.gov (United States)

    Finnigan, O D; Parulan, D

    1973-01-01

    The benfits of establishing family planning through collective bargaining to both labor and management are discussed. Until workers can be convinced that their children will receive health care, education and employment, and that they will be economically secure in old age, it is difficult to convince them of the many benefits of child spacing and small family size. In 1953, it was calculated by management in a Japanese steel factory that about 70% of all acidents could be attributable to difficulties in the private lives of employees. In order to ease problems in the home, collective agreements were initiated by management in the Nippon Express Company to provide family planning services. Labor agreed as long as the workers were to share in the economic awards which came from participation. Costs of implementing the family planning programs were fully offset by the decrease in expenditure on family allowances, confinement, nursing, and so on. In India some ten estates began a program in which a certain amount of money is paid into an account for every month that a woman does not become pregnant. If the woman becomes pregnant, she forfeits a substantial amount of the fund. This money comes directly from the funds which would normally have to be set aside to provide for maternity and child support programs. Certain guidelines are presented in the paper to outline the areas of responsibility of labor and management in the provision of family planning services. Among the many possibilities mentioned is the idea that both labor and management could look into the conceivability of plowing back a portion of whatever savings are accrued by management into a pension scheme to compensate workers for the loss of labor caused by having fewer children than were previously anticipated.

  16. Guidelines for Sandia ASCI Verification and Validation Plans - Content and Format: Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    TRUCANO,TIMOTHY G.; MOYA,JAIME L.

    1999-12-01

    This report summarizes general guidelines for the development of Verification and Validation (V and V) plans for ASCI code projects at Sandia National Laboratories. The main content categories recommended by these guidelines for explicit treatment in Sandia V and V plans are (1) stockpile drivers influencing the code development project (2) the key phenomena to be modeled by the individual code; (3) software verification strategy and test plan; and (4) code validation strategy and test plans. The authors of this document anticipate that the needed content of the V and V plans for the Sandia ASCI codes will evolve as time passes. These needs will be reflected by future versions of this document.

  17. Praxis and guidelines for planned homebirths in the Nordic countries - an overview

    DEFF Research Database (Denmark)

    Lindgren, Helena; Kjaergaard, Hanne; Olafsdottir, Olof Asta

    2014-01-01

    to a midwife attending the birth varies geographically. In the Stockholm County Council guidelines have been developed for publicly funding of planned home births; for the rest of Sweden no national guidelines have been formulated and the service is privately funded. KEY CONCLUSION: Inconsistencies in the home...... birth services of the Nordic countries imply different opportunities for midwifery care to women with regard to their preferred place of birth. Uniform sociodemography, health care systems and cultural context in the Nordic countries are factors in favour of further research to compare and aggregate...... woman has the right to be attended by a midwife during a homebirth and each county council must present a plan for the organization of birth services, including homebirth services. In Norway and Iceland the service is fully or partly funded by taxes and national guidelines are available but access...

  18. Continuity of operations planning in college athletic programs: The case for incorporating Federal Emergency Management Guidelines.

    Science.gov (United States)

    Hall, Stacey A; Allen, Brandon L; Phillips, Dennis

    2016-01-01

    College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.

  19. Quality Primary Care and Family Planning Services for LGBT Clients: A Comprehensive Review of Clinical Guidelines.

    Science.gov (United States)

    Klein, David A; Malcolm, Nikita M; Berry-Bibee, Erin N; Paradise, Scott L; Coulter, Jessica S; Keglovitz Baker, Kristin; Schvey, Natasha A; Rollison, Julia M; Frederiksen, Brittni N

    2018-04-01

    LGBT clients have unique healthcare needs but experience a wide range of quality in the care that they receive. This study provides a summary of clinical guideline recommendations related to the provision of primary care and family planning services for LGBT clients. In addition, we identify gaps in current guidelines, and inform future recommendations and guidance for clinical practice and research. PubMed, Cochrane, and Agency for Healthcare Research and Quality electronic bibliographic databases, and relevant professional organizations' websites, were searched to identify clinical guidelines related to the provision of primary care and family planning services for LGBT clients. Information obtained from a technical expert panel was used to inform the review. Clinical guidelines meeting the inclusion criteria were assessed to determine their alignment with Institute of Medicine (IOM) standards for the development of clinical practice guidelines and content relevant to the identified themes. The search parameters identified 2,006 clinical practice guidelines. Seventeen clinical guidelines met the inclusion criteria. Two of the guidelines met all eight IOM criteria. However, many recommendations were consistent regarding provision of services to LGBT clients within the following themes: clinic environment, provider cultural sensitivity and awareness, communication, confidentiality, coordination of care, general clinical principles, mental health considerations, and reproductive health. Guidelines for the primary and family planning care of LGBT clients are evolving. The themes identified in this review may guide professional organizations during guideline development, clinicians when providing care, and researchers conducting LGBT-related studies.

  20. Guidelines for evaluating software configuration management plans for digital instrumentation and control systems

    International Nuclear Information System (INIS)

    Cheon, Se Woo; Park, Jong Kyun; Lee, Ki Young; Lee, Jang Soo; Kim, Jang Yeon

    2001-08-01

    Software configuration management (SCM) is the process for identifying software configuration items (CIs), controlling the implementation and changes to software, recording and reporting the status of changes, and verifying the completeness and correctness of the released software. SCM consists of two major aspects: planning and implementation. Effective SCM involves planning for how activities are to be performed, and performing these activities in accordance with the Plan. This report first reviews the background of SCM that include key standards, SCM disciplines, SCM basic functions, baselines, software entity, SCM process, the implementation of SCM, and the tools of SCM. In turn, the report provides the guidelines for evaluating the SCM Plan for digital I and C systems of nuclear power plants. Most of the guidelines in the report are based on IEEE Std 828 and ANSI/IEEE Std 1042. According to BTP-14, NUREG-0800, the evaluation topics on the SCM Plan is classified into three categories: management, implementation, and resource characteristics

  1. Analysis of Existing Guidelines for the Systematic Planning Process of Clinical Registries.

    Science.gov (United States)

    Löpprich, Martin; Knaup, Petra

    2016-01-01

    Clinical registries are a powerful method to observe the clinical practice and natural disease history. In contrast to clinical trials, where guidelines and standardized methods exist and are mandatory, only a few initiatives have published methodological guidelines for clinical registries. The objective of this paper was to review these guidelines and systematically assess their completeness, usability and feasibility according to a SWOT analysis. The results show that each guideline has its own strengths and weaknesses. While one supports the systematic planning process, the other discusses clinical registries in great detail. However, the feasibility was mostly limited and the special requirements of clinical registries, their flexible, expandable and adaptable technological structure was not addressed consistently.

  2. Assessing the impact of the U.S. Endangered Species Act recovery planning guidelines on managing threats for listed species.

    Science.gov (United States)

    Troyer, Caitlin M; Gerber, Leah R

    2015-10-01

    The Endangered Species Act (ESA) of the United States was enacted in 1973 to prevent the extinction of species. Recovery plans, required by 1988 amendments to the ESA, play an important role in organizing these efforts to protect and recover species. To improve the use of science in the recovery planning process, the Society for Conservation Biology (SCB) commissioned an independent review of endangered species recovery planning in 1999. From these findings, the SCB made key recommendations for how management agencies could improve the recovery planning process, after which the U.S. Fish and Wildlife Service and the National Marine Fisheries Service redrafted their recovery planning guidelines. One important recommendation called for recovery plans to make threats a primary focus, including organizing and prioritizing recovery tasks for threat abatement. We sought to determine the extent to which results from the SCB study were incorporated into these new guidelines and whether the SCB recommendations regarding threats manifested in recovery plans written under the new guidelines. Recovery planning guidelines generally incorporated the SCB recommendations, including those for managing threats. However, although recent recovery plans have improved in their treatment of threats, many fail to adequately incorporate threat monitoring. This failure suggests that developing clear guidelines for monitoring should be an important priority in improving ESA recovery planning. © 2015 Society for Conservation Biology.

  3. Guidelines for the responsible management of plutonium

    International Nuclear Information System (INIS)

    Agrell, P.H.

    1997-01-01

    Since 1994 an informal group of representatives of States party to the NPT has been trying to develop agreed international guidelines for the responsible management of non-military plutonium. This paper gives a brief description of the outcome. Since the results are still subject to decision by Governments, the description must be in general terms only. The paper describes the background to, and genesis of, the discussions and the general approach taken, which was based on commitment to the NPT, national responsibility for the management of nuclear materials and the fuel cycle, upholding of the IAEA's safeguards system, and a focus on civil material. An indication is given of the development of the Group's thinking, especially the decisions that any guidelines must be capable of accommodating surplus military plutonium, as well as civil, and that the main focus should be on measures to increase transparency. The resulting guidelines are described. Their main features are a re-statement of commitments and standards for the management of non-military plutonium with regard to non-proliferation, safety, and other fields, a commitment to the management of such plutonium according to a consistent national strategy, and a commitment to the publication of information on that strategy, and of annual statistics for holdings of plutonium in a consistent format. Other aspects of the guidelines are also explained. Finally, an attempt is made to assess the possible practical effects of the guidelines if adopted by governments. (author)

  4. Guidelines for conducting pharmaceutical budget impact analyses for submission to public drug plans in Canada.

    Science.gov (United States)

    Marshall, Deborah A; Douglas, Patrick R; Drummond, Michael F; Torrance, George W; Macleod, Stuart; Manti, Orlando; Cheruvu, Lokanadha; Corvari, Ron

    2008-01-01

    Until now, there has been no standardized method of performing and presenting budget impact analyses (BIAs) in Canada. Nevertheless, most drug plan managers have been requiring this economic data to inform drug reimbursement decisions. This paper describes the process used to develop the Canadian BIA Guidelines; describes the Guidelines themselves, including the model template; and compares this guidance with other guidance on BIAs. The intended audience includes those who develop, submit or use BIA models, and drug plan managers who evaluate BIA submissions. The Patented Medicine Prices Review Board (PMPRB) initiated the development of the Canadian BIA Guidelines on behalf of the National Prescription Drug Utilisation Information System (NPDUIS). The findings and recommendations from a needs assessment with respect to BIA submissions were reviewed to inform guideline development. In addition, a literature review was performed to identify existing BIA guidance. The detailed guidance was developed on this basis, and with the input of the NPDUIS Advisory Committee, including drug plan managers from multiple provinces in Canada and a representative from the Canadian Agency for Drugs and Technologies in Health. A Microsoft Excel-based interactive model template was designed to support BIA model development. Input regarding the guidelines and model template was sought from each NPDUIS Advisory Committee member to ensure compatibility with existing drug plan needs. Decisions were made by consensus through multiple rounds of review and discussion. Finally, BIA guidance in Canadian provinces and other countries were compared on the basis of multiple criteria. The BIA guidelines consist of three major sections: Analytic Framework, Inputs and Data Sources, and Reporting Format. The Analytic Framework section contains a discussion of nine general issues surrounding BIAs (model design, analytic perspective, time horizon, target population, costing, scenarios to be compared

  5. Australasian Gastrointestinal Trials Group (AGITG) Contouring Atlas and Planning Guidelines for Intensity-Modulated Radiotherapy in Anal Cancer

    International Nuclear Information System (INIS)

    Ng, Michael; Leong, Trevor; Chander, Sarat; Chu, Julie; Kneebone, Andrew; Carroll, Susan; Wiltshire, Kirsty; Ngan, Samuel; Kachnic, Lisa

    2012-01-01

    Purpose: To develop a high-resolution target volume atlas with intensity-modulated radiotherapy (IMRT) planning guidelines for the conformal treatment of anal cancer. Methods and Materials: A draft contouring atlas and planning guidelines for anal cancer IMRT were prepared at the Australasian Gastrointestinal Trials Group (AGITG) annual meeting in September 2010. An expert panel of radiation oncologists contoured an anal cancer case to generate discussion on recommendations regarding target definition for gross disease, elective nodal volumes, and organs at risk (OARs). Clinical target volume (CTV) and planning target volume (PTV) margins, dose fractionation, and other IMRT-specific issues were also addressed. A steering committee produced the final consensus guidelines. Results: Detailed contouring and planning guidelines and a high-resolution atlas are provided. Gross tumor and elective target volumes are described and pictorially depicted. All elective regions should be routinely contoured for all disease stages, with the possible exception of the inguinal and high pelvic nodes for select, early-stage T1N0. A 20-mm CTV margin for the primary, 10- to 20-mm CTV margin for involved nodes and a 7-mm CTV margin for the elective pelvic nodal groups are recommended, while respecting anatomical boundaries. A 5- to 10-mm PTV margin is suggested. When using a simultaneous integrated boost technique, a dose of 54 Gy in 30 fractions to gross disease and 45 Gy to elective nodes with chemotherapy is appropriate. Guidelines are provided for OAR delineation. Conclusion: These consensus planning guidelines and high-resolution atlas complement the existing Radiation Therapy Oncology Group (RTOG) elective nodal ano-rectal atlas and provide additional anatomic, clinical, and technical instructions to guide radiation oncologists in the planning and delivery of IMRT for anal cancer.

  6. Guidelines for inclusion: Ensuring Indigenous peoples' involvement in water planning processes across South Eastern Australia

    Science.gov (United States)

    Saenz Quitian, Alejandra; Rodríguez, Gloria Amparo

    2016-11-01

    Indigenous peoples within the Murray-Darling Basin have traditionally struggled for the recognition of their cultural, social, environmental, spiritual, commercial and economic connection to the waters that they have traditionally used, as well as their right to engage in all stages of water planning processes. Despite Australian national and federal frameworks providing for the inclusion of Indigenous Australians' objectives in planning frameworks, water plans have rarely addressed these objectives in water, or the strategies to achieve them. Indeed, insufficient resources, a lack of institutional capacity in both Indigenous communities and agencies and an inadequate understanding of Indigenous people's objectives in water management have limited the extent to which Indigenous objectives are addressed in water plans within the Murray-Darling Basin. In this context, the adoption of specific guidelines to meet Indigenous requirements in relation to basin water resources is crucial to support Indigenous engagement in water planning processes. Using insights from participatory planning methods and human rights frameworks, this article outlines a set of alternative and collaborative guidelines to improve Indigenous involvement in water planning and to promote sustainable and just water allocations.

  7. 20 CFR 323.4 - Guidelines for content of a nongovernmental plan.

    Science.gov (United States)

    2010-04-01

    ... benefits, how such benefits will be computed, and the conditions under which an employee will be... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Guidelines for content of a nongovernmental plan. 323.4 Section 323.4 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD...

  8. Play for All Guidelines: Planning, Design and Management of Outdoor Play Settings for All Children. Second Edition.

    Science.gov (United States)

    Moore, Robin C., Ed.; Goltsman, Susan M., Ed.; Iacofano, Daniel S., Ed.

    These guidelines assist professional designers, park and recreation managers, and community groups when making decisions about the planning, design, and ongoing management of children's public play environments. The guidelines are updated to meet or exceed the requirements of the Americans with Disabilities Act Guidelines (July 26, 1991) and the…

  9. Strategy Guideline: Demonstration Home

    Energy Technology Data Exchange (ETDEWEB)

    Savage, C.; Hunt, A.

    2012-12-01

    This guideline will provide a general overview of the different kinds of demonstration home projects, a basic understanding of the different roles and responsibilities involved in the successful completion of a demonstration home, and an introduction into some of the lessons learned from actual demonstration home projects. Also, this guideline will specifically look at the communication methods employed during demonstration home projects. And lastly, we will focus on how to best create a communication plan for including an energy efficient message in a demonstration home project and carry that message to successful completion.

  10. Strategy Guideline. Demonstration Home

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, A.; Savage, C.

    2012-12-01

    This guideline will provide a general overview of the different kinds of demonstration home projects, a basic understanding of the different roles and responsibilities involved in the successful completion of a demonstration home, and an introduction into some of the lessons learned from actual demonstration home projects. Also, this guideline will specifically look at the communication methods employed during demonstration home projects. And lastly, we will focus on how to best create a communication plan for including an energy efficient message in a demonstration home project and carry that message to successful completion.

  11. Utah obstetricians' opinions of planned home birth and conflicting NICE/ACOG guidelines: A qualitative study.

    Science.gov (United States)

    Rainey, Emily; Simonsen, Sara; Stanford, Joseph; Shoaf, Kimberley; Baayd, Jami

    2017-06-01

    The United Kingdom's National Institute for Health and Care Excellence (NICE) recently published recommendations that support planned home birth for low-risk women. The American College of Obstetricians and Gynecologists (ACOG) remains wary of planned home birth, asserting that hospitals and birthing centers are the safest birth settings. Our objective was to examine opinions of obstetricians in Salt Lake City, Utah about home birth in the context of rising home birth rates and conflicting guidelines. Participants were recruited through online searches of Salt Lake City obstetricians and through snowball sampling. We conducted individual interviews exploring experiences with and attitudes toward planned home birth and the ACOG/NICE guidelines. Fifteen obstetricians who varied according to years of experience, location of medical training, sex, and subspecialty (resident, OB/GYN, maternal-fetal medicine specialist) were interviewed. Participants did not recommend home birth but supported a woman's right to choose her birth setting. Obstetrician opinions about planned home birth were shaped by misconceptions of home birth benefits, confusion surrounding the scope of care at home and among home birth providers, and negative transfer experiences. Participants were unfamiliar with the literature on planned home birth and/or viewed the evidence as unreliable. Support for ACOG guidelines was high, particularly in the context of the United States health care setting. Physician objectivity may be limited by biases against home birth, which stem from limited familiarity with published evidence, negative experiences with home-to-hospital transfers, and distrust of home birth providers in a health care system not designed to support home birth. © 2017 Wiley Periodicals, Inc.

  12. A treatment planning comparison of four target volume contouring guidelines for locally advanced pancreatic cancer radiotherapy

    International Nuclear Information System (INIS)

    Fokas, Emmanouil; Eccles, Cynthia; Patel, Neel; Chu, Kwun-Ye; Warren, Samantha; McKenna, W. Gillies; Brunner, Thomas B.

    2013-01-01

    Background and purpose: Contouring of target volumes varies significantly in radiotherapy of pancreatic ductal adenocarcinoma (PDAC). There is a lack of consensus as to whether elective lymph nodes (eLN’s) should be included or not in the planning target volume (PTV). In the present study we analyzed the dosimetric coverage of the eLN’s and organs at risk (OAR) by comparing four different contouring guidelines. Methods and materials: PTVs were delineated with (Oxford and RTOG guidelines) or without (Michigan and SCALOP guidelines) including the eLNs in eleven patients with PDAC. eLNs included the peripancreatic, paraaortic, paracaval, celiac trunk, superior mesenteric and portal vein clinical target volumes (CTVs). A 3D-CRT plan (50.40 Gy in 28 fractions) was performed to analyze and compare the dosimetric coverage of all eLNs and OAR between the 4 contouring guidelines. Results: The size of Oxford and RTOG PTVs was comparable and significantly larger than the SCALOP and Michigan PTVs. Interestingly the eLNs received a significant amount of incidental dose irradiation by PTV-based plans that only aimed to treat the tumor without the eLNs. The dosimetric coverage of eLN presented a large variability according to the respective contouring methods. The difference in the size of the 4 PTVs was reflected to the dose distribution at the OAR. Conclusions: Our study provides important information regarding the impact of different contouring guidelines on the dose distribution to the eLNs and the OAR in patients with locally advanced PDAC treated with radiotherapy

  13. Guidelines for nuclear plant response to an earthquake

    International Nuclear Information System (INIS)

    1989-12-01

    Guidelines have been developed to assist nuclear plant personnel in the preparation of earthquake response procedures for nuclear power plants. The objectives of the earthquake response procedures are to determine (1) the immediate effects of an earthquake on the physical condition of the nuclear power plant, (2) if shutdown of the plant is appropriate based on the observed damage to the plant or because the OBE has been exceeded, and (3) the readiness of the plant to resume operation following shutdown due to an earthquake. Readiness of a nuclear power plant to restart is determined on the basis of visual inspections of nuclear plant equipment and structures, and the successful completion of surveillance tests which demonstrate that the limiting conditions for operation as defined in the plant Technical Specifications are met. The guidelines are based on information obtained from a review of earthquake response procedures from numerous US and foreign nuclear power plants, interviews with nuclear plant operations personnel, and a review of reports of damage to industrial equipment and structures in actual earthquakes. 7 refs., 4 figs., 4 tabs

  14. Guidelines for communicating about the risks of nuclear energy effectively, responsibly, and ethically

    International Nuclear Information System (INIS)

    Covello, V.T.

    1991-01-01

    This paper presents and discusses guidelines for communicating information about the risks of nuclear energy effectively, responsibility, and ethically. It consists of four parts: guidelines for communicating risk information; guidelines for presenting and explaining risk-related numbers and statistics; guidelines for presenting and explaining risk comparisons; and problems frequently encountered in communicating risk information

  15. Personalised Care Plan Management Utilizing Guideline-Driven Clinical Decision Support Systems.

    Science.gov (United States)

    Laleci Erturkmen, Gokce Banu; Yuksel, Mustafa; Sarigul, Bunyamin; Lilja, Mikael; Chen, Rong; Arvanitis, Theodoros N

    2018-01-01

    Older age is associated with an increased accumulation of multiple chronic conditions. The clinical management of patients suffering from multiple chronic conditions is very complex, disconnected and time-consuming with the traditional care settings. Integrated care is a means to address the growing demand for improved patient experience and health outcomes of multimorbid and long-term care patients. Care planning is a prevalent approach of integrated care, where the aim is to deliver more personalized and targeted care creating shared care plans by clearly articulating the role of each provider and patient in the care process. In this paper, we present a method and corresponding implementation of a semi-automatic care plan management tool, integrated with clinical decision support services which can seamlessly access and assess the electronic health records (EHRs) of the patient in comparison with evidence based clinical guidelines to suggest personalized recommendations for goals and interventions to be added to the individualized care plans.

  16. Oil spill response plan

    International Nuclear Information System (INIS)

    1999-08-01

    The plan outlined in this document specifies the actions that the Canadian Wildlife Service Atlantic Region is mandated to take in the event of an oil spill, or on discovering oiled migratory birds in terrestrial, fresh water, marine and inter-tidal habitats. In addition to describing the role and responsibilities of the Canadian Wildlife Service, the document also describes response plans of other agencies for dealing with all wildlife species affected by oil spills. Reporting paths, the lead agency concept, shared responsibilities with other Canadian Wildlife Service regional offices, provincial agencies, Heritage Canada, non-government wildlife response agencies, oil spill response organizations, and international organizations are outlined. An overview of the reporting and communications process is also provided

  17. Administrative Guidelines: Education of Gifted Students [and] Plan for Education of the Gifted in South Dakota.

    Science.gov (United States)

    South Dakota State Dept. of Education and Cultural Affairs, Pierre.

    This document is intended to assist South Dakota schools in the development and implementation of Gifted Education Plans, and includes state laws and rules pertaining to gifted education, guidelines for reporting, and explanations of the necessary components of a district's written plan. A brief statement of philosophy addresses characteristics of…

  18. BWR emergency procedure guidelines

    International Nuclear Information System (INIS)

    Post, J.S.; Karner, E.F.; Stratman, R.A.

    1984-01-01

    This chapter describes plans for dealing with reactor accidents developed by the Boiling Water Reactor (BWR) Owners' Group in response to post-Three Mile Island US NRC requirements. The devised Emergency Procedure Guidelines (EPGs), applicable to all BWRs, are symptom-based rather than event-based. According to the EPGs, the operator does not need to identify what event is occurring in the plant in order to decide what action to take, but need only observe the symptoms (values and trends of key control parameters) which exist and take appropriate action to control these symptoms. The original objective was to provide reactor operator guidance in responding to a small break loss-of-coolant accident (LOCA), but subsequent revisions have included other types of reactor accidents. Topics considered include the reactor pressure vessel (RPV) control guideline, the primary containment control guideline, the secondary containment control guideline, the radioactivity release control guideline, multiple failures vs. the design basis, safe limits vs. technical specifications, the technical status, licensing, and implementation. The EPGs are based upon maintaining both adequate core cooling and primary containment integrity

  19. Revising the South African guidelines for human settlement planning and design (the red book)

    CSIR Research Space (South Africa)

    Van Niekerk, Willemien

    2015-11-01

    Full Text Available The Guidelines for Human Settlement Planning and Design, commonly known as the Red Book, is a South African publication aimed at providing practical guidance to built environment professionals in support of the creation of sustainable and vibrant...

  20. Oil spill response planning, training and facilities for wildlife in Prince William Sound, Alaska

    International Nuclear Information System (INIS)

    Hillman, S.O.

    1996-01-01

    The special provisions of the SERVS System of the Alyeska Pipeline Service Company concerning the treatment of wildlife in the event of an oil spill, were described. The Company is prepared to mobilize a rapid response for protection and treatment of wildlife in the event of an oil spill anywhere along the trans-Alaska pipeline or in Prince William Sound. Equipment for hazing, capture, and treatment is pre-assembled and staged at facilities at the Valdez Marine Terminal. Veterinarians and wildlife treatment specialists are under contract for treating oiled birds. This complex of wildlife response capabilities meets or exceeds the guidelines and response planning standards set by wildlife agencies. 7 refs., 6 figs

  1. Planning guidance for emergency response to a hypothetical nuclear attack on Riyadh, Saudi Arabia

    Science.gov (United States)

    Shubayr, Nasser Ali M.

    The threat of nuclear attack will remain imminent in an ever-advancing society. Saudi Arabia is not immune to this threat. This dissertation establishes planning guidance for response to a nuclear attack on Riyadh, the capital of Saudi Arabia, based on a hypothetical scenario of a nuclear detonation. A case scenario of a one-megaton thermonuclear bomb detonated at ground level over Riyadh is used to support the thesis. Previous nuclear tests and the Hiroshima and Nagasaki bombings have been used to present possible effects on Riyadh. US planning guidance and lessons learned from the Chernobyl and Fukushima nuclear plants accidents have been used to develop the emergency response guidance. The planning guidance outlines a rapid response to the nuclear detonation. Four damage zones have been identified; severe damage zone, moderate damage zone, light damage zone and dangerous fallout zone. Actions that are recommended, and those that should be avoided, have been determined for each zone. Shelter/ evacuation evaluation for blast-affected and fallout-affected areas is the basis for the recommendation that shelter in place is the best decision for the first hours to days after the attack. Guidelines for medical care response and population monitoring and decontamination are included to reduce the early and long-term effects of the attack. Recommendations to the Saudi Arabian authorities have been made to facilitate suitable preparedness and response for such an event.

  2. Planned home birth: the professional responsibility response.

    Science.gov (United States)

    Chervenak, Frank A; McCullough, Laurence B; Brent, Robert L; Levene, Malcolm I; Arabin, Birgit

    2013-01-01

    This article addresses the recrudescence of and new support for midwife-supervised planned home birth in the United States and the other developed countries in the context of professional responsibility. Advocates of planned home birth have emphasized patient safety, patient satisfaction, cost effectiveness, and respect for women's rights. We provide a critical evaluation of each of these claims and identify professionally appropriate responses of obstetricians and other concerned physicians to planned home birth. We start with patient safety and show that planned home birth has unnecessary, preventable, irremediable increased risk of harm for pregnant, fetal, and neonatal patients. We document that the persistently high rates of emergency transport undermines patient safety and satisfaction, the raison d'etre of planned home birth, and that a comprehensive analysis undermines claims about the cost-effectiveness of planned home birth. We then argue that obstetricians and other concerned physicians should understand, identify, and correct the root causes of the recrudescence of planned home birth; respond to expressions of interest in planned home birth by women with evidence-based recommendations against it; refuse to participate in planned home birth; but still provide excellent and compassionate emergency obstetric care to women transported from planned home birth. We explain why obstetricians should not participate in or refer to randomized clinical trials of planned home vs planned hospital birth. We call on obstetricians, other concerned physicians, midwives and other obstetric providers, and their professional associations not to support planned home birth when there are safe and compassionate hospital-based alternatives and to advocate for a safe home-birth-like experience in the hospital. Copyright © 2013 Mosby, Inc. All rights reserved.

  3. [The multidisciplinary practice guideline 'The responsible use of biologicals'].

    NARCIS (Netherlands)

    Bijlsma, J.W.J.; Hagemeijer, J.W.; Bijl, M. van der; Jansen, T.L.Th.A.; Laar, M.A. van der; Landewe, R.B.; Nurmohamed, M.T.

    2011-01-01

    - A multidisciplinary working group has developed a practice guideline containing various recommendations on the responsible and efficient use of biologicals.- These biologicals include both soluble immune-receptor proteins and monoclonal antibodies that are aimed at immune mediators, receptors or

  4. The emergency response guidelines for the Westinghouse pressurized water reactor

    International Nuclear Information System (INIS)

    Dekens, J.P.; Bastien, R.; Prokopovich, S.R.

    1985-01-01

    The Three Mile Island accident has demonstrated that the guidance provided for mitigating the consequences of design basis accidents could be inadequate when multiple incidents, failures or errors occur during or after the accident. Westinghouse and the Westinghouse Owners Group have developed new Emergency Response Guidelines (E.R.G.). The E.R.G. are composed of two independent sets of procedures and of a systematic tool to continuously evaluate the plant safety throughout the response to an accident. a) The Optimal Recovery Guidelines are entered each time the reactor is tripped or the Emergency Core Cooling System is actuated. An immediate verification of the automatic protective actuations is performed and the accident diagnosis process is initiated. When nature of the accident is identified, the operator is transferred to the applicable recovery procedure and subprocedures. A permanent rediagnosis is performed throughout the application of the optimal Recovery Guidelines and cross connections are provided to the adequate procedure if an error in diagnosis is identified. b) Early in the course of the accident, the operating staff initiates monitoring of the Critical Safety Functions. These are defined as the set of functions ensuring the integrity of the physical barriers against radioactivity release. The review of these functions is peformed continuously through a cyclic application of the status trees. c) The Function Restoration Guidelines are entered when the Critical Safety Function monitoring identifies a challenge to one of the functions. Depending on the severity of the challenge, the transfer to a Function Restoration Guideline can be immediate for a severe challenge or delayed for a minor challenge. Those guidelines are independent of the scenario of the accident, but only based on plant parameters and equipment availability

  5. Guidelines on hospital emergency plans for the management of minor radiation accidents

    International Nuclear Information System (INIS)

    1992-12-01

    This document provides guidance on the organizational structure, personnel, facilities, equipment, supplies and treatment principles required for the initial care of injured persons who have been accidentally exposed to ionizing radiation and who may be contaminated with radioisotopes. The first part of the document, directed at hospital administrators, provides guidance on the principles of planning and preparedness for handling a radiation incident. The second part is directed at hospital emergency personnel responsible for treating patients who may be contaminated with radioactive materials. Three types of victims are considered. The first has been accidentally irradiated with X-rays or gamma rays over the entire body or in localized areas. There is no radioactive residue on or about the body. The second type of victim has known or suspected radioactive contamination within a wound, within the body or on the skin. A third type of victim believes he or she has been exposed and contaminated, but has not been. These guidelines apply in particular to smaller community hospitals. (L.L.) 27 refs., 3 figs

  6. The nuclear emergency plans

    International Nuclear Information System (INIS)

    Fuertes Menendez, M. J.; Gasco Leonarte, L.; Granada Ferrero, M. J.

    2007-01-01

    Planning of the response to emergencies in nuclear plants is regulated by the Basic Nuclear Emergency Plan (PLABEN). This basic Plan is the guidelines for drawing up, implementing and maintaining the effectiveness of the nuclear power plant exterior nuclear emergency plans. The five exterior emergency plans approved as per PLABEN (PENGUA, PENCA, PENBU, PENTA and PENVA) place special emphasis on the preventive issues of emergency planning, such as implementation of advance information programs to the population, as well as on training exercises and drills. (Author)

  7. Trial application of guidelines for nuclear plant response to an earthquake

    International Nuclear Information System (INIS)

    Schmidt, W.; Oliver, R.; O'Connor, W.

    1993-09-01

    Guidelines have been developed to assist nuclear plant personnel in the preparation of earthquake response procedures for nuclear power plants. These guidelines are published in EPRI report NP-6695, ''Guidelines for Nuclear Plant Response to an Earthquake,'' dated December 1989. This report includes two sets of nuclear plant procedures which were prepared to implement the guidelines of EPRI report NP-6695. The first set were developed by the Toledo Edison Company Davis-Besse plant. Davis-Besse is a pressurized water reactor (PWR) and contains relatively standard seismic monitoring instrumentation typical of many domestic nuclear plants. The second set of procedures were prepared by Yankee Atomic Electric Company for the Vermont Yankee facility. This plant is a boiling water reactor (BWR) with state-of-the-art seismic monitoring and PC-based data processing equipment, software developed specifically to implement the OBE Exceedance Criterion presented in EPRI report NP-5930, ''A Criterion for Determining Exceedance of the operating Basis Earthquake.'' The two sets of procedures are intended to demonstrate how two different nuclear utilities have interpreted and applied the EPRI guidance given in report NP-6695

  8. Transport accident emergency response plan

    International Nuclear Information System (INIS)

    Vallette-Fontaine, M.; Frantz, P.

    1998-01-01

    To comply with the IAEA recommendations for the implementation of an Emergency Response Plan as described in Safety Series 87, Transnucleaire, a company deeply involved in the road and rail transports of the fuel cycle, masters means of Emergency Response in the event of a transport accident. This paper aims at analyzing the solutions adopted for the implementation of an Emergency Response Plan and the development of a technical support and adapted means for the recovery of heavy packagings. (authors)

  9. Guidelines for developing certification programs for newly generated TRU waste

    International Nuclear Information System (INIS)

    Whitty, W.J.; Ostenak, C.A.; Pillay, K.K.S.; Geoffrion, R.R.

    1983-05-01

    These guidelines were prepared with direction from the US Department of Energy (DOE) Transuranic (TRU) Waste Management Program in support of the DOE effort to certify that newly generated TRU wastes meet the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria. The guidelines provide instructions for generic Certification Program preparation for TRU-waste generators preparing site-specific Certification Programs in response to WIPP requirements. The guidelines address all major aspects of a Certification Program that are necessary to satisfy the WIPP Waste Acceptance Criteria and their associated Compliance Requirements and Certification Quality Assurance Requirements. The details of the major element of a Certification Program, namely, the Certification Plan, are described. The Certification Plan relies on supporting data and control documentation to provide a traceable, auditable account of certification activities. Examples of specific parts of the Certification Plan illustrate the recommended degree of detail. Also, a brief description of generic waste processes related to certification activities is included

  10. Child- and youth-friendly land-use and transport planning guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, R.; O' Brien, C. [Centre for Sustainable Transportation, Toronto, ON (Canada)

    2005-04-27

    Increased automobile use has been associated with rising obesity, reduced academic performance and compromised emotional development in children and youths. This paper proposed a range of guidelines focused on the needs of children and young people. It is intended for use by municipalities or other agencies in transport and land-use planning. Recommendations included the appointment of a staff or council member responsible for bringing a children's perspective to transport and land use planning issues; an identification of the travel needs of young people; an exploration of pedestrian routes used by children to ensure their safety and useability; and the arrangement of walking buses and other means of supervision for very young children. The construction of separate sidewalks for children and youth on heavy traffic roads was recommended, as well as separate bicycle paths and provisions at intersections. It was suggested that planners should ensure that destinations needed by children are within walking or cycling distance. It was also suggested that the transit system should be made safer and introduce or maintain low fares. It was observed that school funding formulas encourage the construction and use of large schools that are more likely to have traffic congestion, and that parents often pressure school boards for more buses so that children will not have to walk or cycle to school. Reductions in road traffic and the enforcement of speed limits in urban areas were recommended, as well as the use of low emission or electric vehicles. It was suggested that there is a lack of parental awareness regarding the short- and long-term health impacts of driving their children rather than supporting active transport. 90 refs., 2 tabs., 9 figs.

  11. The siting guidelines, 10 CFR Part 960

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1991-01-01

    The Siting Guidelines, 10 CFR Part 960, have played a major role in the U.S. Department of Energy's (the Department) Office of Civilian Radioactive Waste Management siting program since their development and implementation in response to the Nuclear Waste Policy Act of 1982. According to the Act, the Siting Guidelines were applicable to the selection of sites for characterization. The Nuclear Waste Policy Amendments Act of 1987 (the Amendments Act) has selected the Yucca Mountain, Nevada, site for characterization from among those nominated according to the Siting Guidelines. Thus, the Amendments Act has taken the repository program beyond the phase of Siting Guidelines applicability, making the U.S. Nuclear Regulatory Commission's 10 CFR Part 60 the applicable regulation. However, the Department has chosen to make use of aspects of the Siting Guidelines in the Site Characterization Plan for the Yucca Mountain Site. (author) 4 figs., 11 refs

  12. Patient attributes warranting consideration in clinical practice guidelines, health workforce planning and policy

    Directory of Open Access Journals (Sweden)

    Segal Leonie

    2011-09-01

    Full Text Available Abstract Background In order for clinical practice guidelines (CPGs to meet their broad objective of enhancing the quality of care and supporting improved patient outcomes, they must address the needs of diverse patient populations. We set out to explore the patient attributes that are likely to demand a unique approach to the management of chronic disease, and which are crucial if evidence or services planning is to reflect clinic populations. These were incorporated into a new conceptual framework; using diabetes mellitus as an exemplar. Methods The patient attributes that informed the framework were identified from CPGs, the diabetes literature, an expert academic panel, and two cross-disciplinary panels; and agreed upon using a modified nominal group technique. Results Full consensus was reached on twenty-four attributes. These factors fell into one of three themes: (1 type/stage of disease, (2 morbid events, and (3 factors impacting on capacity to self-care. These three themes were incorporated in a convenient way in the workforce evidence-based (WEB model. Conclusions While biomedical factors are frequently recognised in published clinical practice guidelines, little attention is given to attributes influencing a person's capacity to self-care. Paying explicit attention to predictable threats to effective self-care in clinical practice guidelines, by drawing on the WEB model, may assist in refinements that would address observed disparities in health outcomes across socio-economic groups. The WEB model also provides a framework to inform clinical training, and health services and workforce planning and research; including the assessment of healthcare needs, and the allocation of healthcare resources.

  13. Integrating the environment in local strategic planning : Guidelines (Case of Morocco)

    Science.gov (United States)

    Benbrahim, Hafsa

    2018-05-01

    Since 2010, an advanced regionalization project has been initiated by Morocco, which plans to consolidate the processes of decentralization and deconcentration by extending the powers of the regions and other local authorities. This project, institutionalized in the 2011 Constitution, defines the territorial organization of the Kingdom and reinforces decentralization according to a model of advanced regionalization. Through advanced regionalization, Morocco aims at integrated and sustainable development in economic, social, cultural and environmental terms, through the development of the potential and resources of each region. However, in order to honor this commitment of advanced regionalization, local authorities must be assisted in adopting a local strategic planning approach, allowing them to develop territorial plans for sustainable development in accordance with the national legal framework, specifically the Framework law 99-12, and international commitments in terms of environmental protection. This research deals with the issue of environmental governance in relation to the role and duties of local authorities. Thus, the main goal of our study is to present the guidelines to be followed by the local authorities to improve the quality of the environment integration process in the local strategic planning with the aim of putting it in a perspective of sustainable development.

  14. Emergency planning and response - role nad responsibilities of the regulatory body

    International Nuclear Information System (INIS)

    Nizamska, M.

    1999-01-01

    The development of a emergency plan and organisation of adequate emergency preparedness in case of radiological accident in NPP cannot be effective without the appropriate preparatory work. In most countries, also in Republic of Bulgaria, several organisations are identified to have a potential role to play in a radiological emergency. For these reason is very important to have a national organisation, with a mandate to organise, inspect and co-ordinate the possibility of ministries and institution to react in case of radiological emergency, i.e. to quarantine the possibility for implementation of adequate counter measure for protection of the population and environment in case of radiological emergency in NPP. For the purposes of the emergency planning and response the NPP operator, ministries and the institutions developed an Emergency plan - NPP Emergency Plan and National Emergency Plan. The development of the emergency plans will be impossible without the good co-operation of the organisations which have a responsibilities in a radiological emergency. Once emergency plans are adopted, each individual organisation, also the NPP operator, must ensure that in can carry out its role effectively in accordance with the emergency plan and can develop the appropriate organisation for action and implementation of protection counter measures. For testing the emergency plans a regular exercise must be organised. Periodic reviews of the plan and modifications, based on actual events and exercise experience must be performed. The main aim of these report is to present the Bulgarian emergency planning organisation and response by explaining the national emergency panning and response legislation, implementation of IAEA recommendations and exercise experience

  15. Guidelines for responsible short-term global health activities: developing common principles.

    Science.gov (United States)

    Lasker, Judith N; Aldrink, Myron; Balasubramaniam, Ramaswami; Caldron, Paul; Compton, Bruce; Evert, Jessica; Loh, Lawrence C; Prasad, Shailendra; Siegel, Shira

    2018-02-07

    Growing concerns about the value and effectiveness of short-term volunteer trips intending to improve health in underserved Global South communities has driven the development of guidelines by multiple organizations and individuals. These are intended to mitigate potential harms and maximize benefits associated with such efforts. This paper analyzes 27 guidelines derived from a scoping review of the literature available in early 2017, describing their authorship, intended audiences, the aspects of short term medical missions (STMMs) they address, and their attention to guideline implementation. It further considers how these guidelines relate to the desires of host communities, as seen in studies of host country staff who work with volunteers. Existing guidelines are almost entirely written by and addressed to educators and practitioners in the Global North. There is broad consensus on key principles for responsible, effective, and ethical programs--need for host partners, proper preparation and supervision of visitors, needs assessment and evaluation, sustainability, and adherence to pertinent legal and ethical standards. Host country staff studies suggest agreement with the main elements of this guideline consensus, but they add the importance of mutual learning and respect for hosts. Guidelines must be informed by research and policy directives from host countries that is now mostly absent. Also, a comprehensive strategy to support adherence to best practice guidelines is needed, given limited regulation and enforcement capacity in host country contexts and strong incentives for involved stakeholders to undertake or host STMMs that do not respect key principles.

  16. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    Science.gov (United States)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  17. Guidelines for District Heating Substations

    Energy Technology Data Exchange (ETDEWEB)

    2009-07-15

    The present guidelines contain a set of recommendations focusing on planning, installation, use and maintenance of district heating (DH) substations within district heating systems throughout Europe. The recommendations were developed in order to enable readers to develop well-functioning substations and an effective heat and domestic warm water delivery. These guidelines are intended to give the most effective overall solutions for various parts of the customer installation. The guidelines are not meant to specify the different components of the substation such as meters or heat exchangers. The guidelines deal with a wide variety of issues concerning both present systems of today and district heating systems of the future. Specific handling and maintenance recommendations are mainly focused on present modern systems but are also intended to cover the future situation as much as is feasible. For this reason, certain existing systems are not dealt with in these guidelines. For instance, these guidelines do not cover steam systems, systems with temperatures exceeding 110 deg C and pressure levels above 1.6 MPa. The guidelines include a chapter on the heat meter, as the meter and especially the meter installation is always installed simultaneously with the rest of the substation. These guidelines aim to provide best-practice and easy-to-handle recommendations for: - those who are responsible for relations between district heating utilities and customers; - those who own or maintain a building connected to the district heating network; - those who manufacture, plan, purchase, test and install substations. These guidelines do not deal with investment or cost aspects, but in general, Euroheat and Power recommends looking at the lifetime cost of all components of the substation, instead of investment costs alone. An example of this is provided in Chapter 7.8. The Guidelines were developed based on the most optimal operating principles of substations and meters

  18. Guidelines on the defense-in-depth and diversity planning and analysis in digital instrumentation and control systems

    International Nuclear Information System (INIS)

    Cheon, Se Woo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Lee, Jang Soo; Kim, Jang Yeol

    2000-08-01

    Digital instrumentation and control (I and C) systems are becoming an ever-increasing part in I and C systems of nuclear power plants due to such features such as versatility, flexibility, and reduced sizes. The digital technology introduces a possibility that common-cause or common-mode failures (CCF or CMF) may cause redundant safety systems to fail in such a way that there is loss of safety function. A special form of CMF analysis called 'defense-in-depth and diversity' (D-in-D and D) analysis has been developed to identify possible common-mode failure vulnerabilities and to support a specific licensing action in digital systems. There are two main stages in D-in-D and D activities: both plan and analysis. The purposes of this technical report are i) to review background of D-in-D and D and some of important issues in digital D-in-D and D, ii) to provide guidelines for a vendor to prepare planning and/or analysis documents on D-in-D and D, and iii) to provide guidelines for an evaluator to review applicant's D-in-D and D planning and/or analysis documents, to ensure that the requirements of the D-in-D and D for digital I and C systems are followed. Most of guidelines suggested in this report were based on NUREG/CR-6303 which was published in 1994. The report will be helpful for a vendor to prepare and for an evaluator to review both D-in-D and D planning or analysis documents for digital I and C systems such as the KNGR project

  19. Guidelines on the defense-in-depth and diversity planning and analysis in digital instrumentation and control systems

    Energy Technology Data Exchange (ETDEWEB)

    Cheon, Se Woo; Park, Jong Kyun; Lee, Ki Young; Kwon, Ki Choon; Lee, Jang Soo; Kim, Jang Yeol

    2000-08-01

    Digital instrumentation and control (I and C) systems are becoming an ever-increasing part in I and C systems of nuclear power plants due to such features such as versatility, flexibility, and reduced sizes. The digital technology introduces a possibility that common-cause or common-mode failures (CCF or CMF) may cause redundant safety systems to fail in such a way that there is loss of safety function. A special form of CMF analysis called 'defense-in-depth and diversity' (D-in-D and D) analysis has been developed to identify possible common-mode failure vulnerabilities and to support a specific licensing action in digital systems. There are two main stages in D-in-D and D activities: both plan and analysis. The purposes of this technical report are (i) to review background of D-in-D and D and some of important issues in digital D-in-D and D, (ii) to provide guidelines for a vendor to prepare planning and/or analysis documents on D-in-D and D, and (iii) to provide guidelines for an evaluator to review applicant's D-in-D and D planning and/or analysis documents, to ensure that the requirements of the D-in-D and D for digital I and C systems are followed. Most of guidelines suggested in this report were based on NUREG/CR-6303 which was published in 1994. The report will be helpful for a vendor to prepare and for an evaluator to review both D-in-D and D planning or analysis documents for digital I and C systems such as the KNGR project.

  20. Development of suicide postvention guidelines for secondary schools: a Delphi study

    Directory of Open Access Journals (Sweden)

    Georgina R. Cox

    2016-02-01

    Full Text Available Abstract Background Suicide of school-aged adolescents is a significant problem, with serious implications for students and staff alike. To date, there is a lack of evidence regarding the most effective way for a secondary school to respond to the suicide of a student, termed postvention [(Crisis 33:208-214, 2012, (Crisis 34:164-182, 2013]. The aim of this study was to employ the expert consensus (Delphi methodology to the development of a set of guidelines, to assist English-speaking secondary schools to develop a plan to respond to a student suicide, or to respond to a suicide in the absence of a predetermined plan. Methods The Delphi methodology was employed, which involved a two-stage process. Firstly, medical and research databases, existing postvention guidelines developed for schools, and lay literature were searched in order to identify potential actions that school staff could carry out following the suicide of a student. Based on this search, an online questionnaire was produced. Secondly, 40 experts in the area of suicide postvention from English-speaking countries were recruited and asked to rate each action contained within this questionnaire, in terms of how important they felt it was to be included in the postvention guidelines. A set of guidelines was developed based on these responses. In total, panel members considered 965 actions across three consensus rounds. Results Five hundred fourty-eight actions were endorsed for inclusion into the postvention guidelines based on an 80 % consensus agreement threshold. These actions were groups according to common themes, which are presented in the following sections: 1. Developing an Emergency Response Plan; 2. Forming an Emergency Response Team; 3. Activating the Emergency Response Team; 4. Managing a suspected suicide that occurs on school grounds; 5. Liaising with the deceased student’s family; 6. Informing staff of the suicide; 7. Informing students of the suicide; 8. Informing

  1. Public informations guidelines

    International Nuclear Information System (INIS)

    1986-06-01

    The purpose of these Public Information Guidelines is to provide principles for the implementation of the NWPA mandate and the Mission Plan requirements for the provision of public information. These Guidelines set forth the public information policy to be followed by all Office of Civilian Radioactive Waste Management (OCRWM) performance components. The OCRWM offices should observe these Guidelines in shaping and conducting public information activities

  2. Public informations guidelines

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-06-01

    The purpose of these Public Information Guidelines is to provide principles for the implementation of the NWPA mandate and the Mission Plan requirements for the provision of public information. These Guidelines set forth the public information policy to be followed by all Office of Civilian Radioactive Waste Management (OCRWM) performance components. The OCRWM offices should observe these Guidelines in shaping and conducting public information activities.

  3. A model national emergency response plan for radiological accidents

    International Nuclear Information System (INIS)

    1993-09-01

    The IAEA has supported several projects for the development of a national response plan for radiological emergencies. As a results, the IAEA has developed a model National Emergency Response Plan for Radiological Accidents (RAD PLAN), particularly for countries that have no nuclear power plants. This plan can be adapted for use by countries interested in developing their own national radiological emergency response plan, and the IAEA will supply the latest version of the RAD PLAN on computer diskette upon request. 2 tabs

  4. Post-mastectomy radiotherapy in Denmark: From 2D to 3D treatment planning guidelines of The Danish Breast Cancer Cooperative Group

    DEFF Research Database (Denmark)

    Thomsen, Mette Skovhus; Berg, Martin; Nielsen, Hanne M.

    2008-01-01

    centres participated. This work also included a definition of the tissue structures needed to be outlined on the planning CT-scan. The work was initiated in 2003 and the guidelines were approved by the DBCG Radiotherapy Committee in 2006. The first of January 2007 the 3D guidelines had been fully...

  5. Exercising the federal radiological emergency response plan

    International Nuclear Information System (INIS)

    Gant, K.S.; Adler, M.V.; Wolff, W.F.

    1986-01-01

    Multiagency exercises were an important part of the development of the Federal Radiological Emergency Response Plan. This paper concentrates on two of these exercises, the Federal Field Exercise in March 1984 and the Relocation Tabletop Exercise in December 1985. The Federal Field Exercise demonstrated the viability and usefulness of the draft plan; lessons learned from the exercise were incorporated into the published plan. The Relocation Tabletop Exercise examined the federal response in the postemergency phase. This exercise highlighted the change over time in the roles of some agencies and suggested response procedures that should be developed or revised. 8 refs

  6. Toward Personalized Pressure Ulcer Care Planning: Development of a Bioinformatics System for Individualized Prioritization of Clinical Pratice Guideline

    Science.gov (United States)

    2016-10-01

    AWARD NUMBER: W81XWH-15-1-0342 TITLE: Toward Personalized Pressure Ulcer Care Planning: Development of a Bioinformatics System for Individualized...Planning: Development of a Bioinformatics System for Individualized Prioritization of Clinical Pratice Guideline 5a. CONTRACT NUMBER 5b. GRANT...recommendations of CPG has been identified by experts in the field. We will use bioinformatics to enable data extraction, storage, and analysis to support

  7. Development application guidelines : Newfoundland offshore area

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    The Canada-Newfoundland Offshore Petroleum Board has created a set of guidelines which describe the information needed by the Board to process a development application by a proponent of an offshore hydrocarbon development project. The guidelines also describe the review process that will be followed in considering a proponent`s application. Proponents must also refer to the Canada-Newfoundland Atlantic Accord Implementation Act and the Canada-Newfoundland Atlantic Accord Implementation (Newfoundland) Act. These guidelines also describe the requirements for the Canada-Newfoundland benefits plan, the environmental impact statement, the socio-economic impact statement, the safety plan, and the environmental protection plan.

  8. Enhancing usability of augmented-reality-based mobile escape guidelines for radioactive accidents

    International Nuclear Information System (INIS)

    Tsai, Ming-Kuan; Yau, Nie-Jia

    2013-01-01

    When radioactive accidents occur, modern tools in information technology for emergency response are good solutions to reduce the impact. Since few information-technology-based applications were developed for people during radioactive accidents, a previous study (Tsai et al., 2012) proposed augmented-reality-based mobile escape guidelines. However, because of the lack of transparent escape routes and indoor escape guidelines, the usability of the guidelines is limited. Therefore, this study introduces route planning and mobile three-dimensional (3D) graphics techniques to address the identified problems. The proposed approach could correctly present the geographical relationship from user locations to the anticipated shelters, and quickly show the floor-plan drawings as users are in the buildings. Based on the testing results, in contrast to the previous study, this study offered better escape routes, when the participants performed self-evacuation in outdoor and indoor environments. Overall, this study is not only a useful reference for similar studies, but also a beneficial tool for emergency response during radioactive accidents. -- Highlights: ► Enhancing the efficiency when people escape from radioactive accidents. ► The spatial relationship is transparently displayed in real time. ► In contrast to a previous study, this study offers better escape guidelines

  9. Emergency response planning in Saskatchewan

    International Nuclear Information System (INIS)

    Irwin, R.W.

    1998-01-01

    Release reporting and spill clean-up requirements by Saskatchewan Energy and Mines were reviewed. Wascana's experience in response planning was discussed. It was suggested that the key to prevention was up-front due diligence, including facility and oil well analysis. Details of Wascana's emergency plan, and details of Saskatchewan Energy and Mines release reporting procedures were also provided

  10. The development of seismic guidelines for the Stanford Linear Accelerator Center

    International Nuclear Information System (INIS)

    Huggins, R.

    1996-08-01

    This paper describes the development of Seismic Guidelines for the Stanford Linear Accelerator Center (SLAC). Although structures have always been built conservatively, SLAC management decided to review and update their seismic guidelines. SLAC is about mid-way between the epicenters of the 8.3 Richter magnitude 1906 San Francisco and the 7.2 Loma Prieta Earthquakes. The west end of the two mile long electron/positron particle accelerator lies a half mile from the large San Andreas Fault. Suggestions for seismic planning processes were solicited from local computer manufacturing firms, universities, and federal laboratories. A Committee of the various stakeholders in SLAC's seismic planning retained an internationally known Seismic Planning Consultant and reviewed relevant standards and drafted Guidelines. A panel of seismic experts was convened to help define the hazard, site response spectra, probabilistic analysis of shaking, and near field effects. The Facility's structures were assigned to seismic classes of importance, and an initial assessment of a sample of a dozen buildings conducted. This assessment resulted in emergency repairs to one structure, and provided a open-quotes reality basisclose quotes for establishing the final Guidelines and Administrative Procedures, and a program to evaluate remaining buildings, shielding walls, tunnels, and other special structures

  11. The development of seismic guidelines for the Stanford Linear Accelerator Center

    Energy Technology Data Exchange (ETDEWEB)

    Huggins, R.

    1996-08-01

    This paper describes the development of Seismic Guidelines for the Stanford Linear Accelerator Center (SLAC). Although structures have always been built conservatively, SLAC management decided to review and update their seismic guidelines. SLAC is about mid-way between the epicenters of the 8.3 Richter magnitude 1906 San Francisco and the 7.2 Loma Prieta Earthquakes. The west end of the two mile long electron/positron particle accelerator lies a half mile from the large San Andreas Fault. Suggestions for seismic planning processes were solicited from local computer manufacturing firms, universities, and federal laboratories. A Committee of the various stakeholders in SLAC`s seismic planning retained an internationally known Seismic Planning Consultant and reviewed relevant standards and drafted Guidelines. A panel of seismic experts was convened to help define the hazard, site response spectra, probabilistic analysis of shaking, and near field effects. The Facility`s structures were assigned to seismic classes of importance, and an initial assessment of a sample of a dozen buildings conducted. This assessment resulted in emergency repairs to one structure, and provided a {open_quotes}reality basis{close_quotes} for establishing the final Guidelines and Administrative Procedures, and a program to evaluate remaining buildings, shielding walls, tunnels, and other special structures.

  12. Guidelines and workbook for assessment of organization and administration of utilities seeking operating license for a nuclear power plant. Guidelines for utility organization and administration plan. Volume 1

    International Nuclear Information System (INIS)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1985-08-01

    The Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The Guidelines allow for individual approaches to organizational structures to account for differences in plant size, number of operating units, number of plant sites, and the individual utility approach to providing technical support. These unique approaches, however, should meet the criteria of a reasoned, fully developed, and logically consistent focus on the user's organization in terms of organization of work, policies and procedures, staffing, and external relationships

  13. ISS Payload Operations: The Need for and Benefit of Responsive Planning

    Science.gov (United States)

    Nahay, Ed; Boster, Mandee

    2000-01-01

    International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of

  14. What of guidelines for osteoarthritis?

    Science.gov (United States)

    Lim, Anita Y N; Doherty, Michael

    2011-05-01

    Osteoarthritis (OA) is by far the most common joint disease and a major cause of pain and disability. The prevalence and impact of OA will increase in the next decades in the Asia-Pacific region due to increased longevity, increasing urbanization and a parallel increase in obesity. The three main types of evidence to inform evidence-based practice are research evidence, expert experience and patient opinion--all three of these are equally weighted. Guideline development groups vary in terms of process and structure of guideline production and in how much integration there is between research, expert and patient evidence. Nevertheless, guidelines on OA concur in recommending: holistic assessment of the patient and individualizing the management plan; patient information access; weight loss if overweight or obese, and prescription of exercise. Additional adjunctive non-pharmacological and pharmacological interventions, including surgery, may be added to this core set as required. However, when audited, it appears that management of OA is often suboptimal, with a major focus on oral analgesics, especially non-steroidal anti-inflammatory drugs. A number of barriers to implementation are evident and appropriate audit of care is necessary to improve delivery of service and to plan healthcare resources. For OA, the effect size of placebo in clinical trials is usually far greater than the additional specific effect of individual treatments, emphasizing the importance of contextual ('meaning') response in this chronic painful condition. This has important implications for clinical care in that optimization of the contextual response can lead to improvements in patient outcomes even in the absence of very effective treatments. © 2011 The Authors. International Journal of Rheumatic Diseases © 2011 Asia Pacific League of Associations for Rheumatology and Blackwell Publishing Asia Pty Ltd.

  15. 36 CFR 910.67 - Square guidelines.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Square guidelines. 910.67... GUIDELINES AND UNIFORM STANDARDS FOR URBAN PLANNING AND DESIGN OF DEVELOPMENT WITHIN THE PENNSYLVANIA AVENUE DEVELOPMENT AREA Glossary of Terms § 910.67 Square guidelines. Square Guidelines establish the Corporation's...

  16. Evaluation criteria for emergency response plans in radiological transportation

    International Nuclear Information System (INIS)

    Lindell, M.K.; Perry, R.W.

    1980-01-01

    This paper identifies a set of general criteria which can be used as guides for evaluating emergency response plans prepared in connection with the transportation of radiological materials. The development of criteria takes the form of examining the meaning and role of emergency plans in general, reviewing the process as it is used in connection with natural disasters and other nonnuclear disasters, and explicitly considering unique aspects of the radiological transportation setting. Eight areas of critical importance for such response plans are isolated: notification procedures; accident assessment; public information; protection of the public at risk; other protective responses; radiological exposure control; responsibility for planning and operations; and emergency response training and exercises. (Auth.)

  17. Environmental aspects of contingency planning and spill response

    International Nuclear Information System (INIS)

    Hillman, S.O.

    1993-01-01

    Alyeska Pipeline Service Company has implemented an incident command system (ICS) for crisis management within the company for response to spills at all company facilities including the Valdez Marine Terminal. The system is also used by Alyeska acting as the initial response contractor for TAPS laden tankers within Prince William Sound. During the past three years, Alyeska has undertaken a complete review of the spill prevention and response plans for these areas. This poster session focuses on the environmental aspects of the response planning efforts. Information is available on contingency planning updates in the areas of dispersant use, burning as a response tool, bioremediation of marine oil spills, waste management, permitting, coastal resource and sensitive habitat data base, and wildlife protection and management. All of these subjects are addressed in the resource documents (RD) supplementing the contingency plans. The RD revisions have been a coordinated effort, involving operators, agencies, and the public through the citizen advisory group

  18. Internal Guidelines for interactions with communities and local governments

    International Nuclear Information System (INIS)

    1985-11-01

    These Guidelines provide principles for interactions with local populations. Interaction with communities and local govenments are the responsibility of the Office of Civilian Radioactive Wastes Management program's implementing offices. The Guidelines provide policy direction to these implementing offices, while preserving their ability to tailor local interactions to fit a given situation, taking into account the social and political context and the history of local involvement in the program. Project Offices conduct community and local interactions within overall program resources which must be husbanded prudently. Careful planning by implementing offices should ensure that adequate resources are available to foster effective interactions with local representatives

  19. Regional adaptation strategies to climate change: Guidelines for urban planning in Serbia

    Directory of Open Access Journals (Sweden)

    Maruna Marija

    2012-01-01

    regulations especially in areas exposed to climate impacts. In the absence of a national strategy of adaptation to climate change, urban planning guidelines could be determined by comparative analysis of regional recommendations in the field of urban planning and the existing legislative framework in Serbia.

  20. Oil spill response planning on the Columbia river estuary

    International Nuclear Information System (INIS)

    Christopherson, S.K.; Slyman, P.M.

    1993-01-01

    The Columbia River Estuary lies along the Washington-Oregon state boundary on the west coast of the United States. The entire area is environmentally very sensitive with numerous large, shallow bays, exposed mud flats, wetland areas, and central channels having maximum currents of three to four knots. These features make the area very difficult to protect from an oil spill. Spill response is further complicated because of the many different state, federal, and local jurisdictions with mandated responsibilities in oil spill response and environmental protection. Under the leadership of the US Coast Guard Marine Safety Office in Portland, Oregon, a steering group was established to guide the development of a response plan for the Columbia River Estuary. A concerted effort was made to include representatives from response organizations, natural resource agencies, and resource users from federal, state, and local governments, and commercial sectors in the planning process. The first draft of an operational response plan was completed the summer of 1992 through a combination of technical workshops, field trips, and small working groups meeting with local communities. The Columbia River Estuary Response Plan prioritizes areas to protect; identifies specific response strategies for protecting these areas; and outlines the Iogistics needed to implement these strategies, including equipment needs, the location of staging areas, and the identification of pre-designed command posts. The local spill response cooperative and oil transportation industry are using the plan to coordinate the purchase of response equipment and the staging of this equipment at numerous locations along the river. The key to success is ensuring that all the groups responding to an event participate in the planning process together. This process has worked well and will serve as a model for response planning for other areas along the Columbia River and coastal areas of Washington and Oregon

  1. Hygiene guideline for the planning, installation, and operation of ventilation and air-conditioning systems in health-care settings - Guideline of the German Society for Hospital Hygiene (DGKH).

    Science.gov (United States)

    Külpmann, Rüdiger; Christiansen, Bärbel; Kramer, Axel; Lüderitz, Peter; Pitten, Frank-Albert; Wille, Frank; Zastrow, Klaus-Dieter; Lemm, Friederike; Sommer, Regina; Halabi, Milo

    2016-01-01

    Since the publication of the first "Hospital Hygiene Guideline for the implementation and operation of air conditioning systems (HVAC systems) in hospitals" (http://www.krankenhaushygiene.de/informationen/fachinformationen/leitlinien/12) in 2002, it was necessary due to the increase in knowledge, new regulations, improved air-conditioning systems and advanced test methods to revise the guideline. Based on the description of the basic features of ventilation concepts, its hygienic test and the usage-based requirements for ventilation, the DGKH section "Ventilation and air conditioning technology" attempts to provide answers for the major air quality issues in the planning, design and the hygienically safe operation of HVAC systems in rooms of health care.

  2. Quality plan for criticality safety calculations at Rocky Flats

    International Nuclear Information System (INIS)

    Pecora, D.

    1978-01-01

    The text of the plan is given, and some of the guidelines followed in writing it are discussed to aid others who may be faced with the same task. The plan is divided into four sections. The Introduction describes the general functions and purpose of the calculational program. The second section, Activities and Responsibilities, lists specific tasks and their purposes and assigns responsibility for performance. The third section references relevant documentation (e.g., ANSI standards), and the final section describes quality plans for specific functions

  3. Simulation as an ethical imperative and epistemic responsibility for the implementation of medical guidelines in health care.

    Science.gov (United States)

    Garbayo, Luciana; Stahl, James

    2017-03-01

    Guidelines orient best practices in medicine, yet, in health care, many real world constraints limit their optimal realization. Since guideline implementation problems are not systematically anticipated, they will be discovered only post facto, in a learning curve period, while the already implemented guideline is tweaked, debugged and adapted. This learning process comes with costs to human health and quality of life. Despite such predictable hazard, the study and modeling of medical guideline implementation is still seldom pursued. In this article we argue that to systematically identify, predict and prevent medical guideline implementation errors is both an epistemic responsibility and an ethical imperative in health care, in order to properly provide beneficence, minimize or avoid harm, show respect for persons, and administer justice. Furthermore, we suggest that implementation knowledge is best achieved technically by providing simulation modeling studies to anticipate the realization of medical guidelines, in multiple contexts, with system and scenario analysis, in its alignment with the emerging field of implementation science and in recognition of learning health systems. It follows from both claims that it is an ethical imperative and an epistemic responsibility to simulate medical guidelines in context to minimize (avoidable) harm in health care, before guideline implementation.

  4. Optimization-based guidelines to retirement planning and pension product design

    DEFF Research Database (Denmark)

    Konicz Bell, Agnieszka Karolina

    their retirement savings, this thesis presents some optimization techniques that could be applied by pension providers and financial advisers to provide individuals with such guidelines. For a given objective function and a number of constraints, we search for the optimal solution, which indicates, for example...... investigate the optimal annuity choice under inflation risk, which is often ignored both by practitioners advising on the retirement planning and by scholars investigating the consumption-investment problems. We search for an optimal level of retirement income in real terms, given investment opportunities...... in inflation-linked, nominal, and variable annuities, as well as in stocks and bonds. Our findings show that real annuities are a crucial asset in every portfolio, and that trying to hedge inflation without investing in inflation-linked products leads to a lower and more volatile retirement income. In the last...

  5. Responsibility modelling for civil emergency planning

    OpenAIRE

    Sommerville, Ian; Storer, Timothy; Lock, Russell

    2009-01-01

    This paper presents a new approach to analysing and understanding civil emergency planning based on the notion of responsibility modelling combined with HAZOPS-style analysis of information requirements. Our goal is to represent complex contingency plans so that they can be more readily understood, so that inconsistencies can be highlighted and vulnerabilities discovered. In this paper, we outline the framework for contingency planning in the United Kingdom and introduce the notion of respons...

  6. Agency procedures for the NRC incident response plan. Final report

    International Nuclear Information System (INIS)

    1983-02-01

    The NRC Incident Response Plan, NUREG-0728/MC 0502 describes the functions of the NRC during an incident and the kinds of actions that comprise an NRC response. The NRC response plan will be activated in accordance with threshold criteria described in the plan for incidents occurring at nuclear reactors and fuel facilities involving materials licensees; during transportation of licensed material, and for threats against facilities or licensed material. In contrast to the general overview provided by the Plan, the purpose of these agency procedures is to delineate the manner in which each planned response function is performed; the criteria for making those response decisions which can be preplanned; and the information and other resources needed during a response. An inexperienced but qualified person should be able to perform functions assigned by the Plan and make necessary decisions, given the specified information, by becoming familiar with these procedures. This rule of thumb has been used to determine the amount of detail in which the agency procedures are described. These procedures form a foundation for the training of response personnel both in their normal working environment and during planned emergency exercises. These procedures also form a ready reference or reminder checklist for technical team members and managers during a response

  7. Emergency response planning in hospitals, United States: 2003-2004.

    Science.gov (United States)

    Niska, Richard W; Burt, Catharine W

    2007-08-20

    This study presents baseline data to determine which hospital characteristics are associated with preparedness for terrorism and natural disaster in the areas of emergency response planning and availability of equipment and specialized care units. Information from the Bioterrorism and Mass Casualty Preparedness Supplements to the 2003 and 2004 National Hospital Ambulatory Medical Care Surveys was used to provide national estimates of variations in hospital emergency response plans and resources by residency and medical school affiliation, hospital size, ownership, metropolitan statistical area status, and Joint Commission accreditation. Of 874 sampled hospitals with emergency or outpatient departments, 739 responded for an 84.6 percent response rate. Estimates are presented with 95 percent confidence intervals. About 92 percent of hospitals had revised their emergency response plans since September 11, 2001, but only about 63 percent had addressed natural disasters and biological, chemical, radiological, and explosive terrorism in those plans. Only about 9 percent of hospitals had provided for all 10 of the response plan components studied. Hospitals had a mean of about 14 personal protective suits, 21 critical care beds, 12 mechanical ventilators, 7 negative pressure isolation rooms, and 2 decontamination showers each. Hospital bed capacity was the factor most consistently associated with emergency response planning and availability of resources.

  8. Comparison of nuclear plant emergency plans of PBNCC members

    International Nuclear Information System (INIS)

    Kato, W.Y.; Hopwood, J.M.

    1987-01-01

    The Nuclear Safety Working Group (NSWG) of the Pacific Basin Nuclear Cooperation Committee initiated cooperation among Pacific Basin areas based primarily around emergency planning. The NSWG conducted a review of the emergency response plans of members. This paper briefly reviews and makes a comparison of the emergency response plans, with particular attention on the response organization, the planning zone, and the protective action guidelines for emergencies. Although all areas have adopted the same basic elements of emergency planning and are similar, there are also variances due to different governmental structures, population densities, and available resources. It is found that the most significant difference is in the size of the emergency planning zone. The paper concludes with a discussion on possible future cooperative activities of the working group. (author)

  9. Responsive consumerism: empowerment in markets for health plans.

    Science.gov (United States)

    Elbel, Brian; Schlesinger, Mark

    2009-09-01

    American health policy is increasingly relying on consumerism to improve its performance. This article examines a neglected aspect of medical consumerism: the extent to which consumers respond to problems with their health plans. Using a telephone survey of five thousand consumers conducted in 2002, this article assesses how frequently consumers voice formal grievances or exit from their health plan in response to problems of differing severity. This article also examines the potential impact of this responsiveness on both individuals and the market. In addition, using cross-group comparisons of means and regressions, it looks at how the responses of "empowered" consumers compared with those who are "less empowered." The vast majority of consumers do not formally voice their complaints or exit health plans, even in response to problems with significant consequences. "Empowered" consumers are only minimally more likely to formally voice and no more likely to leave their plan. Moreover, given the greater prevalence of trivial problems, consumers are much more likely to complain or leave their plans because of problems that are not severe. Greater empowerment does not alleviate this. While much of the attention on consumerism has focused on prospective choice, understanding how consumers respond to problems is equally, if not more, important. Relying on consumers' responses as a means to protect individual consumers or influence the market for health plans is unlikely to be successful in its current form.

  10. Planned Change in Agrarian Countries.

    Science.gov (United States)

    Niehoff, Arthur H.

    The report provides operationally relevant concepts and guidelines for persons responsible for planning and implementing development projects in agrarian countries. A framework for describing or evaluating the conduct of development projects is proposed, and applied to the results of an analysis of 203 case studies of past projects. Influences,…

  11. Record of responses to public comments on proposed general guidelines for recommendation of sites for nuclear waste repositories

    International Nuclear Information System (INIS)

    1983-01-01

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425, referred to in this document as the Act) assigned to the US Department of Energy (DOE) the authority for the disposal of high-level radioactive waste and spent nuclear fuel. Among other provisions, the Act specifies a process and schedule for the siting of two geologic repositories for this purpose. The Act requires that the DOE issue general guidelines for the recommendation of sites for repositories. The guidelines are to be developed in consultation with three Federal agencies (the Council on Environmental Quality, the US Environmental Protection Agency, and the US Geological Survey) and with interested Governors and issued with the concurrence of the US Nuclear Regulatory Commission. To meet this directive, the DOE convened a task force of program experts to develop proposed guidelines, issued the proposed guidelines on February 7, 1983, and invited comments from the specified Federal agencies, interested Governors, and the general public. Public hearings on the proposed guidelines were held in March at the following locations: Chicago, New Orleans, Washington, DC, Salt Lake City, and Seattle. After considering the resulting comments and preparing responses to them, the task force prepared a draft of this comment-response document and a set of alternative guidelines; these documents were issued on May 27, 1983. This document summarizes the record of comments that directly led to the alternative guidelines of May 27, 1983. It contains synopses of comments, presents the responses of the task force to the comments, and briefly describes how the proposed guidelines of February 7, 1983, were revised to produce the alternative guidelines of May 27, 1983. 13 references

  12. Emergency planning and response preparedness in Slovenia

    International Nuclear Information System (INIS)

    Martincic, R.; Frlin-Lubi, A.; Usenicnik, B.

    2000-01-01

    Disasters do occur and so do nuclear or radiological accidents. Experience has shown that advance emergency response preparedness is essential in order to mitigate the consequences of an accident. In Slovenia, the Civil Protection Organization is the responsible authority for emergency preparedness and response to any kind of disasters. The Krko Nuclear Power Plant is the only nuclear power plant in Slovenia. To date the plant has operated safely and no serious incidents have been recorded. Slovenia nevertheless, maintains a high level of emergency preparedness, which is reflected in the area of prevention and safety and in the area of emergency response preparedness. The emergency management system for nuclear emergencies is incorporated into an overall preparedness and response system. The paper presents an overview of nuclear or radiological emergency response preparedness in Slovenia and its harmonization with the international guidelines. (author)

  13. Hygiene guideline for the planning, installation, and operation of ventilation and air-conditioning systems in health-care settings – Guideline of the German Society for Hospital Hygiene (DGKH

    Directory of Open Access Journals (Sweden)

    Külpmann, Rüdiger

    2016-02-01

    Full Text Available Since the publication of the first “Hospital Hygiene Guideline for the implementation and operation of air conditioning systems (HVAC systems in hospitals” ( in 2002, it was necessary due to the increase in knowledge, new regulations, improved air-conditioning systems and advanced test methods to revise the guideline. Based on the description of the basic features of ventilation concepts, its hygienic test and the usage-based requirements for ventilation, the DGKH section “Ventilation and air conditioning technology” attempts to provide answers for the major air quality issues in the planning, design and the hygienically safe operation of HVAC systems in rooms of health care.

  14. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  15. Emergency Response Guideline Development

    International Nuclear Information System (INIS)

    Gary D Storrick

    2007-01-01

    Task 5 of the collaborative effort between ORNL, Brazil, and Westinghouse for the International Nuclear Energy Research Initiative entitled 'Development of Advanced Instrumentation and Control for an Integrated Primary System Reactor' focuses on operator control and protection system interaction, with particular emphasis on developing emergency response guidelines (ERGs). As in the earlier tasks, we will use the IRIS plant as a specific example of an integrated primary system reactor (IPSR) design. The present state of the IRIS plant design--specifically, the lack of a detailed secondary system design--precludes establishing detailed emergency procedures at this time. However, we can create a structure for their eventual development. This report summarizes our progress to date. Section 1.2 describes the scope of this effort. Section 2 compares IPSR ERG development to the recent AP1000 effort, and identifies three key plant differences that affect the ERGs and control room designs. The next three sections investigate these differences in more detail. Section 3 reviews the IRIS Safety-by-Design philosophy and its impact on the ERGs. Section 4 looks at differences between the IRIS and traditional loop PWR I and C Systems, and considers their implications for both control room design and ERG development. Section 5 examines the implications of having one operating staff control multiple reactor units. Section 6 provides sample IRIS emergency operating procedures (EOPs). Section 7 summarizes our conclusions

  16. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  17. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  18. Ethics-sensitivity of the Ghana national integrated strategic response plan for pandemic influenza.

    Science.gov (United States)

    Laar, Amos; DeBruin, Debra

    2015-05-07

    Many commentators call for a more ethical approach to planning for influenza pandemics. In the developed world, some pandemic preparedness plans have already been examined from an ethical viewpoint. This paper assesses the attention given to ethics issues by the Ghana National Integrated Strategic Plan for Pandemic Influenza (NISPPI). We critically analyzed the Ghana NISPPI's sensitivity to ethics issues to determine how well it reflects ethical commitments and principles identified in our review of global pandemic preparedness literature, existing pandemic plans, and relevant ethics frameworks. This paper reveals that important ethical issues have not been addressed in the Ghana NISPPI. Several important ethical issues are unanticipated, unacknowledged, and unplanned for. These include guidelines on allocation of scarce resources, the duties of healthcare workers, ethics-sensitive operational guidelines/protocols, and compensation programs. The NISPPI also pays scant attention to use of vaccines and antivirals, border issues and cooperation with neighboring countries, justification for delineated actions, and outbreak simulations. Feedback and communication plans are nebulous, while leadership, coordination, and budgeting are quite detailed. With respect to presentation, the NISPPI's text is organized around five thematic areas. While each area implicates ethical issues, NISPPI treatment of these areas consistently fails to address them. Our analysis reveals a lack of consideration of ethics by the NISPPI. We contend that, while the plan's content and fundamental assumptions provide support for implementation of the delineated public health actions, its consideration of ethical issues is poor. Deficiencies include a failure to incorporate guidelines that ensure fair distribution of scarce resources and a lack of justification for delineated procedures. Until these deficiencies are recognized and addressed, Ghana runs the risk of rolling out unjust and ethically

  19. OSART guidelines

    International Nuclear Information System (INIS)

    1988-02-01

    The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the operational safety of nuclear power plants. These OSART Guidelines provide overall guidance for the experts to ensure the consistency and comprehensiveness of the operational safety review. Specific guidelines are provided as guide for the systematic review in the following areas important to operational safety: management, organization and administration, training and qualification, operations, maintenance, technical support, radiation protection, chemistry, emergency planning and preparedness

  20. Emergency response planning in Pennsylvania

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1988-01-01

    In the decade since the accident at Three Mile Island, emergency planning for response to these events has undergone a significant change in Pennsylvania, as elsewhere. Changes respond to federal guidance and to state agency initiatives. The most singular change is the practice of implementing a protective action throughout the entire emergency planning zone (EPZ). Due to Pennsylvania agency experiences during the accident, the decision was made soon after to develop a staff of nuclear engineers, each giving special day-to-day attention to a specific nuclear power station in the state. Changes in communications capabilities are significant, these being dedicated phone lines between the Commonwealth and each power station, and the reorientation of the Department of Environmental Resources radio network to accommodate direction of field monitoring teams from Harrisburg. Changes that are being or will be implemented in the near future include assessing the emergency response data system for electronic delivery of plant parameter data form facilities during accidents, increased participation in exercises, emergency medical planning, and training, the inclusion of all 67 counties in Pennsylvania in an ingestion EPZ, and the gradual severance of dependence on land-line emergency communication systems

  1. ANS-8.23: Criticality accident emergency planning and response

    International Nuclear Information System (INIS)

    Pruvost, N.L.

    1991-01-01

    A study group has been formed under the auspices of ANS-8 to examine the need for a standard on nuclear criticality accident emergency planning and response. This standard would be ANS-8.23. ANSI/ANS-8.19-1984, Administrative Practices for Nuclear Criticality Safety, provides some guidance on the subject in Section 10 titled -- Planned Response to Nuclear Criticality Accidents. However, the study group has formed a consensus that Section 10 is inadequate in that technical guidance in addition to administrative guidance is needed. The group believes that a new standard which specifically addresses emergency planning and response to a perceived criticality accident is needed. Plans for underway to request the study group be designated a writing group to create a draft of such a new standard. The proposed standard will divide responsibility between management and technical staff. Generally, management will be charged with providing the necessary elements of emergency planning such as a criticality detection and alarm system, training, safe evacuation routes and assembly areas, a system for timely accountability of personnel, and an effective emergency response organization. The technical staff, on the other hand, will be made responsible for establishing specific items such as safe and clearly posted evacuation evacuation routes and dose criteria for personnel assembly areas. The key to the question of responsibilities is that management must provide the resources for the technical staff to establish the elements of an emergency response effort

  2. Guidelines for Learning Stations.

    Science.gov (United States)

    Fehrle, Carl C.; Schulz, Jolene

    Guidelines for designing and planning learning stations for pupils at the elementary grade level include suggestions on how to develop a station that will be successful in meeting the learners' needs. Instructions for the use of tapes at a station and matching pupils with stations are given, as are guidelines on classroom arrangement and record…

  3. Disaster Response and Planning for Libraries.

    Science.gov (United States)

    Kahn, Miriam B.

    Providing a customized disaster response plan to assist libraries in quick recovery, this resource also outlines step to minimize damage and protect materials before trouble strikes. The first section of the book, "Response," contains information how to handle small jobs in-house and suggestions for working with contractors--with an…

  4. Gender Responsive Community Based Planning and Budgeting ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... Responsive Community Based Planning and Budgeting Tool for Local Governance ... in data collection, and another module that facilitates gender responsive and ... In partnership with UNESCO's Organization for Women in Science for the ...

  5. Risk analysis in oil spill response planning

    International Nuclear Information System (INIS)

    Chernoplekov, A.N.; Alexandrov, A.A.

    2005-01-01

    Tiered response is a basic approach to emergency plans, including oil spill response (OSR). This paper delineates a huge set of accidental scenarios within a certain tier of response generated by a computer during risk assessment. Parameters such as the amount of oil spilled, duration of discharge and types of losses should be provided in OSR scenarios. Examples of applications include offshore installations, sub sea or onshore pipelines, and localized onshore facilities. The paper demonstrates how to use risk analysis results for delineating all likely spills into groups that need a specific tier response. The best world practices and Russian regulatory approaches were outlined and compared. Corresponding algorithms were developed and their application in pipelines was presented. The algorithm combines expert's skills and spill trajectory modeling with the net environmental benefit analysis principle into the incident specific emergency response planning. 9 refs., 13 tabs., 2 figs

  6. Hanford Emergency Response Plan

    International Nuclear Information System (INIS)

    Wagoner, J.D.

    1994-04-01

    The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures

  7. Hanford Emergency Response Plan

    Energy Technology Data Exchange (ETDEWEB)

    Wagoner, J.D.

    1994-04-01

    The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures.

  8. 40 CFR 799.11 - Availability of test guidelines.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Availability of test guidelines. 799.11... General Provisions § 799.11 Availability of test guidelines. (a) The TSCA and FIFRA guidelines for the...-487-4650). (b) The OECD guidelines for the various study plans are available from the following...

  9. 40 CFR 60.36e - Inspection guidelines.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Inspection guidelines. 60.36e Section...) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Hospital/Medical/Infectious Waste Incinerators § 60.36e Inspection guidelines. (a) For approval, a State plan shall...

  10. Phase II -- Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan

    Energy Technology Data Exchange (ETDEWEB)

    Berg, K.

    1994-09-01

    To establish guidelines for the implementation and administration of an injury and illness prevention program for PVUSA and to assign specific responsibilities for the execution of the program. To provide a basic Safety and Health Action Plan (hereinafter referred to as Plan) that assists management, supervision, and project personnel in the recognition, evaluation, and control of hazardous activities and/or conditions within their respective areas of responsibility.

  11. Sites Requiring Facility Response Plans, Geographic NAD83, EPA (2006) [facility_response_plan_sites_la_EPA_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Locations of facilities in Louisiana requiring Oil Pollution Act (OPA) Facility Response Plans (FRP). The dataset was provided by the Region 6 OSCARS program....

  12. Oil spill response planning under the Oil Pollution Act of 1990

    International Nuclear Information System (INIS)

    Lees, J.E.

    1992-01-01

    The oil spill in Alaska's Prince William Sound on March 24, 1989 illustrated the need for more resources, better planning, and better command and control to efficiently and effectively respond to, contain and cleanup catastrophic oil spills. In response to public concern and industry initiatives to resolve existing oil spill response problems. Congress enacted the comprehensive Oil Pollution Act of 1990 (OPA-90) on August 18, 1990. OPA-90 mandates comprehensive changes in vessel and facility response planning, envisioning a comprehensive and integrated oil spill response planning scheme, with revisions to reflect OPA-90's new requirements. Area Committees comprised of federal, state and local officials and others will prepare Area Contingency Plans for Coast Guard approval, which set forth the framework for responding to open-quotes worst case dischargesclose quotes. Owners and operators of tank vessels and onshore and offshore facilities must submit individual response plans for federal approval by February 18, 1993, identifying and ensuring availability of private personnel and equipment necessary to remove to the maximum extent practicable a open-quotes worst case discharge.close quotes The Coast Guard is considering rules to implement these requirements. Major challenges exist to meet the statutory requirements, including response times, skimming efficiencies, adverse weather and others that affect emergency response capability. This paper focuses on: (1) oil spill response problems identified and lessons learned from the Prince William Sound spill; (2) OPA-90's complex and technical oil spill response planning requirements and their effect on response planning for marine operations; (3) the federal regulatory program to implement OPA-90, defining spill response capability for a open-quotes worst case discharge,close quotes considering existing response resources and the new capabilities by the industry-supported Marine Spill Response Corporation

  13. 40 CFR 60.33e - Emissions guidelines.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Emissions guidelines. 60.33e Section 60...) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Hospital/Medical/Infectious Waste Incinerators § 60.33e Emissions guidelines. (a) For approval, a State plan shall...

  14. Federal, provincial and territorial public health response plan for biological events.

    Science.gov (United States)

    McNeill, R; Topping, J

    2018-01-04

    The Federal/Provincial/Territorial (FPT) Public Health Response Plan for Biological Events was developed for the Public Health Network Council (PHNC). This plan outlines how the national response to public health events caused by biological agents will be conducted and coordinated, with a focus on implementation of responses led by senior-level FPT public health decision-makers. The plan was developed by an expert task group and was approved by PHNC in October, 2017. The plan describes roles, responsibilities and authorities of FPT governments for public health and emergency management, a concept of operations outlining four scalable response levels and a governance structure that aims to facilitate an efficient, timely, evidence-informed and consistent approach across jurisdictions. Improving effective engagement amongst public health, health care delivery and health emergency management authorities is a key objective of the plan.

  15. Criteria for evaluation and guidelines for land use planning in terms of sustainable urban development

    Directory of Open Access Journals (Sweden)

    Irena Ostojić

    2014-10-01

    Full Text Available Sustainable spatial development is a generally accepted objective and principle in spatial planning. It is implemented mainly by regulations in the sectors for management of natural resources, but not comprehensively in implementing regulations for urban space management. One of the most important instruments of spatial planning at local level is land use, for which there is no comprehensive framework of implementing measures for achieving sustainable spatial objectives in urban areas. In accordance with the review and critical analysis of literature, there are four measures presented in the paper: protection of natural resources and reduction of environmental-climate risks, compact urban structure, mixed-use and accessibility of urban functions. The review and analysis have shown that the listed measures enable sustainable development of urban areas, but only if they are planned and implemented in accordance with supporting physical, social and economic elements of urban space. In the conclusion, indicators which can assess the level of sustainability in land use design are presented and guidelines for restructuring land use in existing settlement areas are described.

  16. Guidelines for indoor air hygiene in school buildings

    Energy Technology Data Exchange (ETDEWEB)

    Moriske, Heinz-Joern; Szewzyk, Regine (eds.)

    2008-08-15

    The new guidelines for indoor air hygiene in school buildings are intended as a response to current requirements in school practice. The recommendations aim to help to avoid mistakes in modernising school buildings and to provide hygiene-specific support in planning of new school buildings. The guidelines are laid out as follows: (a) In the general section the targets of the guidelines and the target groups are addressed. The current indoor hygiene situation in German schools is described, followed by the parameters with regard to peripheral issues which will not be dealt with further; (b) Part A deals with the hygiene requirements in the practical running of schools. Besides general requirements for maintenance and operation the important issues of cleaning and ventilation are considered, as well as minor building works; (c) Part B provides an overview of important chemical and biological contaminants in schools; (d) Part C looks at building and air conditioning requirements. The important issues of acoustic requirements is also addressed; (e) Part D shows how to deal practically with problem cases and list case studies with 'typical' procedures; (f) Part E provides a brief overview of existing renovation guidelines.

  17. Guidelines for indoor air hygiene in school buildings

    Energy Technology Data Exchange (ETDEWEB)

    Moriske, Heinz-Joern; Szewzyk, Regine [eds.

    2008-08-15

    The new guidelines for indoor air hygiene in school buildings are intended as a response to current requirements in school practice. The recommendations aim to help to avoid mistakes in modernising school buildings and to provide hygiene-specific support in planning of new school buildings. The guidelines are laid out as follows: (a) In the general section the targets of the guidelines and the target groups are addressed. The current indoor hygiene situation in German schools is described, followed by the parameters with regard to peripheral issues which will not be dealt with further; (b) Part A deals with the hygiene requirements in the practical running of schools. Besides general requirements for maintenance and operation the important issues of cleaning and ventilation are considered, as well as minor building works; (c) Part B provides an overview of important chemical and biological contaminants in schools; (d) Part C looks at building and air conditioning requirements. The important issues of acoustic requirements is also addressed; (e) Part D shows how to deal practically with problem cases and list case studies with 'typical' procedures; (f) Part E provides a brief overview of existing renovation guidelines.

  18. NDMA guidelines on handling of nuclear and radiological emergencies

    Energy Technology Data Exchange (ETDEWEB)

    Abani, M C [National Disaster Management Authority, New Delhi (India)

    2010-07-01

    The vulnerability to the disasters is high in India due to the large population density, fast growing urbanization, industrialization and also because of poor economic conditions of people. Natural disasters have been recurring phenomena in India, leading to extensive loss of life, livelihood and property. The primary reason for such heavy losses can be attributed to the reactive and response-centric approach adopted in the past in handling of the disasters. Based on the Guidelines a holistic approach is to be adopted for Nuclear Emergency Management Framework that assigns the highest priority to prevention, mitigation and compliance to regulatory requirements, while strengthening preparedness, capacity development, response etc. It will be implemented through strengthening of the existing action plans or by preparing new action plans at national, state and district levels by the stakeholders at all levels of administration

  19. NDMA guidelines on handling of nuclear and radiological emergencies

    International Nuclear Information System (INIS)

    Abani, M.C.

    2010-01-01

    The vulnerability to the disasters is high in India due to the large population density, fast growing urbanization, industrialization and also because of poor economic conditions of people. Natural disasters have been recurring phenomena in India, leading to extensive loss of life, livelihood and property. The primary reason for such heavy losses can be attributed to the reactive and response-centric approach adopted in the past in handling of the disasters. Based on the Guidelines a holistic approach is to be adopted for Nuclear Emergency Management Framework that assigns the highest priority to prevention, mitigation and compliance to regulatory requirements, while strengthening preparedness, capacity development, response etc. It will be implemented through strengthening of the existing action plans or by preparing new action plans at national, state and district levels by the stakeholders at all levels of administration

  20. Safety plan for the cooperative telerobotic retrieval system equipment development area

    Energy Technology Data Exchange (ETDEWEB)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  1. Safety plan for the cooperative telerobotic retrieval system equipment development area

    International Nuclear Information System (INIS)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A)

  2. Emergency response planning and preparedness for transport accidents involving radioactive material

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of this Guide is to provide assistance to public authorities and others (including consignors and carriers of radioactive materials) who are responsible for ensuring safety in establishing and developing emergency response arrangements for responding effectively to transport accidents involving radioactive materials. This Guide is concerned mainly with the preparation of emergency response plans. It provides information which will assist those countries whose involvement with radioactive materials is just beginning and those which have already developed their industries involving radioactive materials and attendant emergency plans, but may need to review and improve these plans. The need for emergency response plans and the ways in which they are implemented vary from country to country. In each country, the responsible authorities must decide how best to apply this Guide, taking into account the actual shipments and associated hazards. In this Guide the emergency response planning and response philosophy are outlined, including identification of emergency response organizations and emergency services that would be required during a transport accident. General consequences which could prevail during an accident are described taking into account the IAEA Regulations for the Safe Transport of Radioactive Material. 43 refs, figs and tabs

  3. Quality of Diagnosis and Treatment Plans After Using the 'Diagnostic Guideline for Anxiety and Challenging Behaviours' in People with Intellectual Disabilities: A Comparative Multiple Case Study Design.

    Science.gov (United States)

    Pruijssers, Addy; van Meijel, Berno; Maaskant, Marian; Keeman, Noortje; van Achterberg, Theo

    2016-07-01

    People with intellectual disabilities often have a multitude of concurrent problems due to the combination of cognitive impairments, psychiatric disorders (particularly anxiety) and related challenging behaviours. Diagnoses in people with intellectual disabilities are complicated. This study evaluates the quality of the diagnoses and treatment plans after using a guideline that was developed to support professionals in their diagnostic tasks. A comparative multiple case study with an experimental and control condition, applying deductive analyses of diagnoses and treatment plans. The analyses revealed that the number of diagnostic statements and planned treatment actions in the experimental group was significantly larger and more differentiated than in the control condition. In the control group, consequential harm and protective factors were hardly mentioned in diagnoses and treatment plans. Working with the 'Diagnostic Guideline for Anxiety and CB' leads to improved diagnoses and treatment plans compared with care as usual. © 2015 John Wiley & Sons Ltd.

  4. Data Qualification guidelines

    International Nuclear Information System (INIS)

    Edwards, T.B.; Shine, E.P.

    1992-01-01

    Data Qualification (DQ) is a formal, technical process whose objective is to affirm that experimental data are suitable for their intended use. Although it is not possible to develop a fixed recipe for the DQ process to cover all test situations, these general guidelines have been developed for the Nuclear Engineering Section to establish a framework for qualifying data from steady-state processing. These guidelines outline the role of the DQ team providing insight into the planning and conducting of the DQ process

  5. 40 CFR 256.01 - Purpose and scope of the guidelines.

    Science.gov (United States)

    2010-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose... guidelines is to assist in the development and implementation of State solid waste management plans, in... objectives of environmentally sound management and disposal of solid and hazardous waste, resource...

  6. Standard operating procedures for ESPEN guidelines and consensus papers.

    Science.gov (United States)

    Bischoff, Stephan C; Singer, Pierre; Koller, Michael; Barazzoni, Rocco; Cederholm, Tommy; van Gossum, André

    2015-12-01

    The ESPEN Guideline standard operating procedures (SOP) is based on the methodology provided by the Association of Scientific Medical Societies of Germany (AWMF), the Scottish Intercollegiate Guidelines Network (SIGN), and the Centre for Evidence-based Medicine at the University of Oxford. The SOP is valid and obligatory for all future ESPEN-sponsored guideline projects aiming to generate high-quality guidelines on a regular basis. The SOP aims to facilitate the preparation of guideline projects, to streamline the consensus process, to ensure quality and transparency, and to facilitate the dissemination and publication of ESPEN guidelines. To achieve this goal, the ESPEN Guidelines Editorial board (GEB) has been established headed by two chairmen. The GEB will support and supervise the guideline processes and is responsible for the strategic planning of ESPEN guideline activities. Key elements of the SOP are the generation of well-built clinical questions according to the PICO system, a systemic literature search, a classification of the selected literature according to the SIGN evidence levels providing an evidence table, and a clear and straight-forward consensus procedure consisting of online voting's and a consensus conference. Only experts who meet the obligation to disclosure any potential conflict of interests and who are not employed by the Industry can participate in the guideline process. All recommendations will be graded according to the SIGN grading and novel outcome models besides biomedical endpoints. This approach will further extent the leadership of ESPEN in creating up-to-date and suitable for implementation guidelines and in sharing knowledge on malnutrition and clinical nutrition. Copyright © 2015 Elsevier Ltd and European Society for Clinical Nutrition and Metabolism. All rights reserved.

  7. Water management planning guideline for waterpower

    International Nuclear Information System (INIS)

    2002-05-01

    Hydroelectric power has been used in Ontario for over 150 years, providing the impetus to economic development in the province. Currently, 83 hydroelectric utilities own the more than 200 hydro power facilities in Ontario, accounting for approximately 26 per cent of the total electrical generating capacity in the province. Flood control and the creation of recreational opportunities were added benefits derived from the construction of hydroelectric dams. The three ways of operating hydroelectric facilities are: run-of-the-river which involves minimal forebay storage, peaking which involves the operation of the dam for specific periods of high energy demand, and intermediate. The Ontario government plans to open the electricity market to competition, guided by four principles: (1) protecting consumers and offering more choice, (2) ensuring a strong business climate with a reliable supply of electricity, (3) protecting the environment, and (4) encouraging new ways of doing business and new sources of power. To address issues that arise from the operation of hydroelectric facilities, dam owners and hydroelectric facilities operators are required to develop Water Management Plans, outlining how the facility will be operated to balance environmental, social and economic objectives. The present document was developed to define goals and principles concerning planning, the scope of Water Management Plans, the criteria and the general planning process to be adopted for the preparation of the Plans. 1 tab., 4 figs

  8. The World Health Organization-United Nations Population Fund Strategic Partnership Programme's implementation of family planning guidelines and tools in Asia-Pacific countries.

    Science.gov (United States)

    Mody, Sheila K; Ba-Thike, Katherine; Gaffield, Mary E

    2013-04-01

    The aim of this study was to assess the impact of the Strategic Partnership Programme, a collaboration between the World Health Organization and the United Nations Population Fund to improve evidence-based guidance for country programs through the introduction of selected practice guidelines to improve sexual and reproductive health. Information for this report is from questionnaires sent to Ministries of Health in 2004 (baseline assessment) and in 2007 (assessment of outcome), annual country reports and personal communication with focal points from Ministries of Health and World Health Organization regional and country offices. Following the Strategic Partnership Programme, family planning guidance was used extensively to: formulate and update reproductive health policy; update standards and guidelines; improve training curricula; conduct training activities; develop advocacy and communication materials; and promote change in service. The Strategic Partnership Programme was successful in promoting the introduction of evidence-based guidelines for reproductive health in several Asian countries. The countries that adapted the family planning guidance observed an increase in demand for contraceptives commodities. © 2012 The Authors. Journal of Obstetrics and Gynaecology Research © 2012 Japan Society of Obstetrics and Gynecology.

  9. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  10. From Delivery to Adoption of Physical Activity Guidelines: Realist Synthesis

    Directory of Open Access Journals (Sweden)

    Liliana Leone

    2017-10-01

    Full Text Available Background: Evidence-based guidelines published by health authorities for the promotion of health-enhancing physical activity (PA, continue to be implemented unsuccessfully and demonstrate a gap between evidence and policies. This review synthesizes evidence on factors influencing delivery, adoption and implementation of PA promotion guidelines within different policy sectors (e.g., health, transport, urban planning, sport, education. Methods: Published literature was initially searched using PubMed, EBSCO, Google Scholar and continued through an iterative snowball technique. The literature review spanned the period 2002–2017. The realist synthesis approach was adopted to review the content of 39 included studies. An initial programme theory with a four-step chain from evidence emersion to implementation of guidelines was tested. Results: The synthesis furthers our understanding of the link between PA guidelines delivery and the actions of professionals responsible for implementation within health services, school departments and municipalities. The main mechanisms identified for guidance implementation were scientific legitimation, enforcement, feasibility, familiarity with concepts and PA habits. Threats emerged to the successful implementation of PA guidelines at national/local jurisdictional levels. Conclusions: The way PA guidelines are developed may influence their adoption by policy-makers and professionals. Useful lessons emerged that may inform synergies between policymaking and professional practices, promoting win-win multisectoral strategies.

  11. Waste minimization and pollution prevention awareness plan

    International Nuclear Information System (INIS)

    1991-01-01

    The purpose of this plan is to document the Lawrence Livermore National Laboratory (LLNL) Waste Minimization and Pollution Prevention Awareness Program. The plan specifies those activities and methods that are or will be employed to reduce the quantity and toxicity of wastes generated at the site. The intent of this plan is to respond to and comply with (DOE's) policy and guidelines concerning the need for pollution prevention. The Plan is composed of a LLNL Waste Minimization and Pollution Prevention Awareness Program Plan and, as attachments, Program- and Department-specific waste minimization plans. This format reflects the fact that waste minimization is considered a line management responsibility and is to be addressed by each of the Programs and Departments. 14 refs

  12. Waste minimization and pollution prevention awareness plan

    Energy Technology Data Exchange (ETDEWEB)

    1991-05-31

    The purpose of this plan is to document the Lawrence Livermore National Laboratory (LLNL) Waste Minimization and Pollution Prevention Awareness Program. The plan specifies those activities and methods that are or will be employed to reduce the quantity and toxicity of wastes generated at the site. The intent of this plan is to respond to and comply with (DOE's) policy and guidelines concerning the need for pollution prevention. The Plan is composed of a LLNL Waste Minimization and Pollution Prevention Awareness Program Plan and, as attachments, Program- and Department-specific waste minimization plans. This format reflects the fact that waste minimization is considered a line management responsibility and is to be addressed by each of the Programs and Departments. 14 refs.

  13. Key Response Planning Factors for the Aftermath of Nuclear Terrorism

    Energy Technology Data Exchange (ETDEWEB)

    Buddemeier, B R; Dillon, M B

    2009-01-21

    Despite hundreds of above-ground nuclear tests and data gathered from Hiroshima and Nagasaki, the effects of a ground-level, low-yield nuclear detonation in a modern urban environment are still the subject of considerable scientific debate. Extensive review of nuclear weapon effects studies and discussions with nuclear weapon effects experts from various federal agencies, national laboratories, and technical organizations have identified key issues and bounded some of the unknowns required to support response planning for a low-yield, ground-level nuclear detonation in a modern U.S. city. This study, which is focused primarily upon the hazards posed by radioactive fallout, used detailed fallout predictions from the advanced suite of three-dimensional (3-D) meteorology and plume/fallout models developed at Lawrence Livermore National Laboratory (LLNL), including extensive global Key Response Planning Factors for the Aftermath of Nuclear Terrorism geographical and real-time meteorological databases to support model calculations. This 3-D modeling system provides detailed simulations that account for complex meteorology and terrain effects. The results of initial modeling and analysis were presented to federal, state, and local working groups to obtain critical, broad-based review and feedback on strategy and messaging. This effort involved a diverse set of communities, including New York City, National Capitol Regions, Charlotte, Houston, Portland, and Los Angeles. The largest potential for reducing casualties during the post-detonation response phase comes from reducing exposure to fallout radiation. This can be accomplished through early, adequate sheltering followed by informed, delayed evacuation.B The response challenges to a nuclear detonation must be solved through multiple approaches of public education, planning, and rapid response actions. Because the successful response will require extensive coordination of a large number of organizations, supplemented by

  14. The implementation of the IAEA accident response plan in Yugoslav practice

    International Nuclear Information System (INIS)

    Orlic, M.; Pavlovic, R.; Markovic, S.; Pavlovic, S.

    1996-01-01

    One of the important lessons from the Chernobyl accident is the necessity of existence of operational national emergency response plan. Summarizing consequences and experiences after Chernobyl accident, expert groups from IAEA, ICRP and other international scientific organizations, have been extensively worked on reviewing old ones, and preparing new radiation protection and nuclear safety principals and codes. One of the important issue is national emergency response plan for radiological accident. The nuclear accident response plan in Yugoslavia is presented in this paper. It is essentially based on IAEA model national response plan for radiological accident. This model has to be adjusted to the specificity of member states. The optimum society organization for emergency management in the case of accidents in ionizing radiation sources practices is suggested in this paper. Specific characteriztics of Yugoslav state organization relating to accident response are emphasised. (author)

  15. Radiological emergency response planning in Pennsylvania

    International Nuclear Information System (INIS)

    Henderson, O.K.

    1981-01-01

    The most important aspect of emergency preparedness is to recognize and accept the fact that there exists a potential for a problem or a condition and that it requires some attention. Emergency plans should be sufficiently flexible so as to accommodate the emergency situation as it unfolds. Of the several emergency responses that may be taken following a nuclear power plant accident evacuation evokes the greatest attention and discussion as to whether it is truly a feasible option. Movements of people confined to mass care facilities or on life support systems involve special requirements. The Three Mile Island accident has been the most studied nuclear incident in the history of the nuclear power reactor industry. The findings of these reports will have a major influence on nuclear power issues as they are addressed in the future. The question remains as to whether the political leadership will be willing to provide the resources required by the emergency plan. Future safety and emergency response to nuclear accidents depend upon Government and industry acting responsibly and not merely responding to regulations. The Three Mile Island accident has had some beneficial side effects for the emergency management community. It has: increased the level of awareness and importance of emergency planning; served as a catalyst for the sharing of experiences and information; encouraged standardization of procedures; and emphasized the need for identifying and assigning responsibilities. The Emergency Management Organization in responding to a disaster situation does not enjoy the luxury of time. It needs to act decisively and correctly. It does not often get a second chance. Governments, at all levels, and the nuclear power industry have been put on notice as a result of Three Mile Island. The future of nuclear energy may well hang in the balance, based upon the public's perception of the adequacy of preparedness and safety measures being taken. (author)

  16. Evaluation process of global environmental impact: assessment guidelines

    International Nuclear Information System (INIS)

    Memon, A.R.; Mahar, R.B.

    2001-01-01

    In developed and developing countries, the EIA (Environmental Impact Assessment) is becoming mandatory for the approval of Industrial projects and projects of Environmental hazards. The approving authority of each country has its own guidelines to get projects approved and make project proponents responsible to submit Environmental Impact Statement for the its detailed assessment. In this paper authors have studied an existing EIA Global guidelines and its evaluation process of altogether 40 countries from four continents, Asia, Pacific/Middle East, Europe, Australia and America/Canada. This evaluation process is recorded in the tabulation form and it has been formulated stage wise in which stage one highlights the inception of EIA guidelines of each country and stage two and three gives implementation process. The inception stage of guidelines gives an idea that when EIA was started and an implementation stages provide all information that when EIA become a part of legislation that provide an opportunity to the reader to understand the decision making process for project approvals. The main objective of writing EIA guidelines is to monitor the sustain ability of various types of the projects under different sectoral guidelines, therefore Projects related with different Sectors have been chosen and a detailed record in tabulation form gives an idea to understand the interaction of these guidelines. To make this paper more comprehensive, authors have gone thorough the sectoral guidelines of altogether 64 countries and studied 21 sector oriented project fields. These are of Agriculture/Irrigation, Biodiversity, Coastal/Marine, Community Participation, Extractive industries, Fisheries, Forestry, Hazard Risk, Health, Human settlement, Industry, Multi sectorial, Ports and Harbors, Power, refugees/resettlement, Social, Strategies/Planning, Tourism/Recreational, transportation, Waste Pollution and Wetlands/Water resources. (author)

  17. On the need for a national radiological response plan in Egypt

    International Nuclear Information System (INIS)

    Gant, K.D.; Salama, M.; Ghani, A.H.A.; Sharnouby, A.E.; Hamouda, I.

    1997-01-01

    Use of radioactive materials and sources is increasing within the Arab Republic of Egypt. With this increase comes a need to prepare for accidents involving these materials. For years there has been an informal agreement between the National Centre for Nuclear Safety and Radiation Control (NCNSRC), one of the four centers operated by the Atomic Energy Agency (AEA), and the Civil Defense Authority (CDA) to cooperate in a radiological emergency. CDA currently has the responsibility for responding to all types of emergencies. The increasing use of radioactive materials and the complexity of the response required by accidents creates a need for a more formal arrangement. In response to the increasing possibility of radiation accidents in or near Egypt, the government is preparing the Egyptian Emergency Response Plan for Radiological Accidents to coordinate the response efforts of the national agencies. This plan, which is now being finalized, provides information on agency roles and responsibilities during a response. The plan will also provide a basis for initiating training, planning for emergency public information, and developing public education efforts

  18. RE-PLAN: An Extensible Software Architecture to Facilitate Disaster Response Planning

    Science.gov (United States)

    O’Neill, Martin; Mikler, Armin R.; Indrakanti, Saratchandra; Tiwari, Chetan; Jimenez, Tamara

    2014-01-01

    Computational tools are needed to make data-driven disaster mitigation planning accessible to planners and policymakers without the need for programming or GIS expertise. To address this problem, we have created modules to facilitate quantitative analyses pertinent to a variety of different disaster scenarios. These modules, which comprise the REsponse PLan ANalyzer (RE-PLAN) framework, may be used to create tools for specific disaster scenarios that allow planners to harness large amounts of disparate data and execute computational models through a point-and-click interface. Bio-E, a user-friendly tool built using this framework, was designed to develop and analyze the feasibility of ad hoc clinics for treating populations following a biological emergency event. In this article, the design and implementation of the RE-PLAN framework are described, and the functionality of the modules used in the Bio-E biological emergency mitigation tool are demonstrated. PMID:25419503

  19. Radioactive materials transportation emergency response plan

    International Nuclear Information System (INIS)

    Karmali, N.

    1987-05-01

    Ontario Hydro transports radioactive material between its nuclear facilities, Atomic Energy of Canada Limited at Chalk River Laboratories and Radiochemical Company in Kanata, on a regular basis. Ontario Hydro also occasionally transports to Whiteshell Laboratories, Hydro-Quebec and New Brunswick Electric Power Commission. Although there are stringent packaging and procedural requirements for these shipments, Ontario Hydro has developed a Radioactive Materials Transportation Emergency Response Plan in the event that there is an accident. The Transportation Emergency Response plan is based on six concepts: 1) the Province id divided into three response areas with each station (Pickering, Darlington, Bruce) having identified response areas; 2) response is activated via a toll-free number. A shift supervisor at Pickering will answer the call, determine the hazards involved from the central shipment log and provide on-line advice to the emergency worker. At the same time he will notify the nearest Ontario Hydro area office to provide initial corporate response, and will request the nearest nuclear station to provide response assistance; 3) all stations have capability in terms of trained personnel and equipment to respond to an accident; 4) all Ontario Hydro shipments are logged with Pickering NGS. Present capability is based on computerized logging with the computer located in the shift office at Pickering to allow quick access to information on the shipment; 5) there is a three tier structure for emergency public information. The local Area Manager is the first Ontario Hydro person at the scene of the accident. The responding facility technical spokesperson is the second line of Corporate presence and the Ontario Hydro Corporate spokesperson is notified in case the accident is a media event; and 6) Ontario Hydro will respond to non-Hydro shipments of radioactive materials in terms of providing assistance, guidance and capability. However, the shipper is responsible

  20. Action plan in response to March 1981 report to NFPQT Committee

    International Nuclear Information System (INIS)

    1981-03-01

    This plan of action has been prepared at the direction of the Acting Under Secretary in response to the report of the Nuclear Facilities Personnel Qualifications and Training (NFPQT) Committee on A Safety Assessment of Department of Energy Nuclear Reactors. Senior Department officials with Headquarters responsibilities for the safety of nuclear facilities owned by and operated for the Department have developed this plan with input from the operations office managers having operational responsibility for such facilities. A summary of the plan's objectives and a cross-reference to the findings of the NFPQT Committee Report is attached to the plan. Appendix A contains implementing actions and Appendix B contains a summary of actions responsive to lessons learned from the TMI accident that have been completed or are well underway. Although the plan is written in definitive language, the specific actions (such as organization realignments and proposals) will be subject to appropriate review and approval. Also, other adjustments may be required as the actions are implemented

  1. Osteoarthritis guidelines: a progressive role for topical nonsteroidal anti-inflammatory drugs

    Directory of Open Access Journals (Sweden)

    Stanos SP

    2013-04-01

    Full Text Available Steven P Stanos Rehabilitation Institute of Chicago, Center for Pain Management, Chicago, IL, USA Abstract: Current treatment guidelines for the treatment of chronic pain associated with osteoarthritis reflect the collective clinical knowledge of international experts in weighing the benefits of pharmacologic therapy options while striving to minimize the negative effects associated with them. Consideration of disease progression, pattern of flares, level of functional impairment or disability, response to treatment, coexisting conditions such as cardiovascular disease or gastrointestinal disorders, and concomitant prescription medication use should be considered when creating a therapeutic plan for a patient with osteoarthritis. Although topical nonsteroidal anti-inflammatory drugs historically have not been prevalent in many of the guidelines for osteoarthritis treatment, recent evidence-based medicine and new guidelines now support their use as a viable option for the clinician seeking alternatives to typical oral formulations. This article provides a qualitative review of these treatment guidelines and the emerging role of topical nonsteroidal anti-inflammatory drugs as a therapy option for patients with localized symptoms of osteoarthritis who may be at risk for oral nonsteroidal anti-inflammatory drug-related serious adverse events. Keywords: osteoarthritis, nonsteroidal anti-inflammatory drugs, guidelines, topical analgesics, diclofenac

  2. Guidelines 2.0: systematic development of a comprehensive checklist for a successful guideline enterprise

    Science.gov (United States)

    Schünemann, Holger J.; Wiercioch, Wojtek; Etxeandia, Itziar; Falavigna, Maicon; Santesso, Nancy; Mustafa, Reem; Ventresca, Matthew; Brignardello-Petersen, Romina; Laisaar, Kaja-Triin; Kowalski, Sérgio; Baldeh, Tejan; Zhang, Yuan; Raid, Ulla; Neumann, Ignacio; Norris, Susan L.; Thornton, Judith; Harbour, Robin; Treweek, Shaun; Guyatt, Gordon; Alonso-Coello, Pablo; Reinap, Marge; Brožek, Jan; Oxman, Andrew; Akl, Elie A.

    2014-01-01

    Background: Although several tools to evaluate the credibility of health care guidelines exist, guidance on practical steps for developing guidelines is lacking. We systematically compiled a comprehensive checklist of items linked to relevant resources and tools that guideline developers could consider, without the expectation that every guideline would address each item. Methods: We searched data sources, including manuals of international guideline developers, literature on guidelines for guidelines (with a focus on methodology reports from international and national agencies, and professional societies) and recent articles providing systematic guidance. We reviewed these sources in duplicate, extracted items for the checklist using a sensitive approach and developed overarching topics relevant to guidelines. In an iterative process, we reviewed items for duplication and omissions and involved experts in guideline development for revisions and suggestions for items to be added. Results: We developed a checklist with 18 topics and 146 items and a webpage to facilitate its use by guideline developers. The topics and included items cover all stages of the guideline enterprise, from the planning and formulation of guidelines, to their implementation and evaluation. The final checklist includes links to training materials as well as resources with suggested methodology for applying the items. Interpretation: The checklist will serve as a resource for guideline developers. Consideration of items on the checklist will support the development, implementation and evaluation of guidelines. We will use crowdsourcing to revise the checklist and keep it up to date. PMID:24344144

  3. Commentary on recent therapeutic guidelines for osteoarthritis.

    Science.gov (United States)

    Cutolo, Maurizio; Berenbaum, Francis; Hochberg, Marc; Punzi, Leonardo; Reginster, Jean-Yves

    2015-06-01

    Despite availability of international evidence-based guidelines for osteoarthritis (OA) management, agreement on the different treatment modalities is lacking. A symposium of European and US OA experts was held within the framework of the Annual European Congress of Rheumatology to discuss and compare guidelines and recommendations for the treatment of knee OA and to reach a consensus for management, particularly for areas in which there is no clear consensus: non-pharmacological therapy; efficacy and safety of analgesics and non-steroidal anti-inflammatory drugs (NSAIDs); intra-articular (i.a.) hyaluronates (HA); and the role of chondroitin sulfate (CS) and/or glucosamine sulfate (GS). All guidelines reviewed agree that knee OA is a progressive disease of the joint whose management requires non-pharmacological and pharmacological approaches. Discrepancies between guidelines are few and mostly reflect heterogeneity of expert panels involved, geographical differences in the availability of pharmacotherapies, and heterogeneity of the studies included. Panels chosen for guideline development should include experts with real clinical experience in drug use and patient management. Implementation of agreed guidelines can be thwarted by drug availability and reimbursement plans, resulting in optimal OA treatment being jeopardized, HA and symptomatic slow-acting drugs for osteoarthritis (SySADOAs) being clear examples of drugs whose availability and prescription can greatly vary geographically. In addition, primary care providers, often responsible for OA management (at least in early disease), may not adhere to clinical care guidelines, particularly for non-pharmacological OA treatment. Harmonization of the recommendations for knee OA treatment is challenging but feasible, as shown by the step-by-step therapeutic algorithm developed by the European Society for Clinical and Economic Aspects of Osteoporosis and Osteoarthritis (ESCEO). More easily disseminated and

  4. AsMA Medical Guidelines for Air Travel: In-Flight Medical Care.

    Science.gov (United States)

    Thibeault, Claude; Evans, Anthony D; Pettyjohn, Frank S; Alves, Paulo M

    2015-06-01

    Medical Guidelines for Airline Travel provide information that enables healthcare providers to properly advise patients who plan to travel by air. All airlines are required to provide first aid training for cabin crew, and the crew are responsible for managing any in-flight medical events. There are also regulatory requirements for the carriage of first aid and medical kits. AsMA has developed recommendations for first aid kits, emergency medical kits, and universal precaution kits.

  5. Osteoarthritis guidelines: a progressive role for topical nonsteroidal anti-inflammatory drugs.

    Science.gov (United States)

    Stanos, Steven P

    2013-01-01

    Current treatment guidelines for the treatment of chronic pain associated with osteoarthritis reflect the collective clinical knowledge of international experts in weighing the benefits of pharmacologic therapy options while striving to minimize the negative effects associated with them. Consideration of disease progression, pattern of flares, level of functional impairment or disability, response to treatment, coexisting conditions such as cardiovascular disease or gastrointestinal disorders, and concomitant prescription medication use should be considered when creating a therapeutic plan for a patient with osteoarthritis. Although topical nonsteroidal anti-inflammatory drugs historically have not been prevalent in many of the guidelines for osteoarthritis treatment, recent evidence-based medicine and new guidelines now support their use as a viable option for the clinician seeking alternatives to typical oral formulations. This article provides a qualitative review of these treatment guidelines and the emerging role of topical nonsteroidal anti-inflammatory drugs as a therapy option for patients with localized symptoms of osteoarthritis who may be at risk for oral nonsteroidal anti-inflammatory drug-related serious adverse events.

  6. OSART guidelines. 1992 edition

    International Nuclear Information System (INIS)

    1992-01-01

    The IAEA Operational Safety Review Team (OSART) Guidelines provide overall guidance for the experts to ensure the consistency and comprehensiveness of the operational safety review. Specific guidelines are provided as a guide for the systematic review in the following areas important to operational safety: management, organization and administration, training and qualification, operations, maintenance, technical support, radiation protection, chemistry, emergency planning and preparedness. Additional guidance and reference material has been prepared by the IAEA to complement the expertise of the OSART members

  7. Workplace health and safety during pandemic influenza : CAGC guideline

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-11-15

    Pandemic influenza is a possible biological hazard that employers must take into account during hazard assessment and emergency planning. This report presented a guideline to all workplaces in Alberta and provided information on legislated requirements, best practices, guidelines and strategies in workplace health and safety and employment standards in the event of a pandemic influenza. The report explained the difference between a pandemic and a pandemic influenza, and why scientists expect another pandemic influenza. Pandemic influenza was described as being different from seasonal influenza. This document also explained how pandemic influenza relates to the worker and the workplace, and how the workplace can prepare for and respond to pandemic influenza. Pandemic influenza hazard categories were also listed along with steps in the hazard assessment and control of pandemic influenza. The steps involve listing the types of work and work-related activities; identifying the hazard; assessing the hazards; implementing controls; communicating the information to workers and providing training; and evaluating the effectiveness of controls. The guide also addressed emergency response plan development for pandemic influenza; first aid; and employment standards during pandemic influenza. refs., tabs.

  8. Environmental audit guidelines for pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    Environmental auditing is a form of management control which provides an objective basis by which a company can measure the degree of compliance with environmental regulations. Other benefits of this type of auditing include improved environmental management, furthering communication on environmental issues of concern within the company, and provision of documentation on environmental diligence. A series of environmental audit guidelines for pipelines is presented in the form of lists of questions to be asked during an environmental audit followed by recommended actions in response to those questions. The questions are organized into seven main categories: environmental management and planning; operating procedures; spill prevention; management of wastes and hazardous materials; environmental monitoring; construction of pipelines; and pipeline abandonment, decommissioning and site reclamation

  9. Multicultural Communities: Guidelines for Library Services. Third Edition

    Science.gov (United States)

    International Federation of Library Associations and Institutions (NJ1), 2009

    2009-01-01

    These Guidelines constitute the third edition of the International Federation of Library Associations (IFLA) "Multicultural Communities: "Guidelines for Library Services." This revision follows the IFLA Section of Library Services to Multicultural Populations' "2006-2010 Strategic Plans": to review and revise the…

  10. The development and revision of the Federal Radiological Emergency Response Plan

    International Nuclear Information System (INIS)

    Gant, K.S.; Adler, M.V.; Wolff, W.F.

    1989-01-01

    Since 1985, federal agencies have been using the Federal Radiological Emergency Response Plan (FRERP) in exercises and real events. This experience and the development of other emergency response guidance (e.g., National System for Emergency Coordination) are fueling current efforts to review and revise the FRERP to reflect what the agencies have learned since the FRERP was published. Revision efforts are concentrating on clarifying the plan and addressing deficiencies. No major changes are expected in the general structure of the federal response nor should states need to revise their plans because of these modifications. 5 refs

  11. Women's Preventive Services Guidelines Affordable Care Act Expands Prevention Coverage for Women's Health and Well-Being

    Science.gov (United States)

    ... in existing guidelines. Health Resources and Services Administration Women's Preventive Services Guidelines Non-grandfathered plans (plans or policies created or sold after March 23, 2010, or older plans or policies that ...

  12. Ethics and professional responsibility: Essential dimensions of planned home birth.

    Science.gov (United States)

    McCullough, Laurence B; Grünebaum, Amos; Arabin, Birgit; Brent, Robert L; Levene, Malcolm I; Chervenak, Frank A

    2016-06-01

    Planned home birth is a paradigmatic case study of the importance of ethics and professionalism in contemporary perinatology. In this article we provide a summary of recent analyses of the Centers for Disease Control database on attendants and birth outcomes in the United States. This summary documents the increased risks of neonatal mortality and morbidity of planned home birth as well as bias in Apgar scoring. We then describe the professional responsibility model of obstetric ethics, which is based on the professional medical ethics of two major figures in the history of medical ethics, Drs. John Gregory of Scotland and Thomas Percival of England. This model emphasizes the identification and careful balancing of the perinatologist's ethical obligations to pregnant, fetal, and neonatal patients. This model stands in sharp contrast to one-dimensional maternal-rights-based reductionist model of obstetric ethics, which is based solely on the pregnant woman's rights. We then identify the implications of the professional responsibility model for the perinatologist's role in directive counseling of women who express an interest in or ask about planned home birth. Perinatologists should explain the evidence of the increased, preventable perinatal risks of planned home birth, recommend against it, and recommend planned hospital birth. Perinatologists have the professional responsibility to create and sustain a strong culture of safety committed to a home-birth-like experience in the hospital. By routinely fulfilling these professional responsibilities perinatologists can help to prevent the documented, increased risks planned home birth. Copyright © 2016 Elsevier Inc. All rights reserved.

  13. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Science.gov (United States)

    2010-07-01

    .... 155, App. C Appendix C to Part 155—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan dealing with training is one of the key elements of a response plan. This concept is... included training as one of the sections required in a vessel or facility response plan. In reviewing...

  14. Emergency preparedness and response plan for nuclear facilities in Indonesia

    International Nuclear Information System (INIS)

    Nur Rahmah Hidayati; Pande Made Udiyani

    2009-01-01

    All nuclear facilities in Indonesia are owned and operated by the National Nuclear Energy Agency (BATAN). The programs and activities of emergency planning and preparedness in Indonesia are based on the existing nuclear facilities, i.e. research reactors, research reactor fuel fabrication plant, radioactive waste treatment installation and radioisotopes production installation. The assessment is conducted to learn of status of emergency preparedness and response plan for nuclear facilities in Indonesia and to support the preparation of future Nuclear Power Plant. The assessment is conducted by comparing the emergency preparedness and response system in Indonesia to the system in other countries such as Japan and Republic of Korea, since the countries have many Nuclear Power Plants and other nuclear facilities. As a result, emergency preparedness response plan for existing nuclear facility in Indonesia has been implemented in many activities such as environmental monitoring program, facility monitoring equipment, and the continuous exercise of emergency preparedness and response. However, the implementation need law enforcement for imposing the responsibility of the coordinators in National Emergency Preparedness Plan. It also needs some additional technical support systems which refer to the system in Japan or Republic of Korea. The systems must be completed with some real time monitors which will support the emergency preparedness and response organization. The system should be built in NPP site before the first NPP will be operated. The system should be connected to an Off Site Emergency Center under coordination of BAPETEN as the regulatory body which has responsibility to control of nuclear energy in Indonesia. (Author)

  15. Guideline on action plans and strategies to mobilize waste-to-energy production

    Energy Technology Data Exchange (ETDEWEB)

    Loonik, J.; Saarepera, R.; Kaeger, M. [and others

    2012-12-15

    This report presents some results of the REMOWE project and sets guidelines for regional policy makers, SME's and the general public as well for more deep realization of waste-to-energy policy principles in action. The overall objective of the project is, on regional levels, to contribute to a decreased negative effect on the environment by reduction of carbon dioxide emission by creating a balance between energy consumption and sustainable use of renewable energy sources (waste-to-energy cycle). Reduction of carbon dioxide emissions and use of renewable energy sources are broad areas and this project will focus on energy resources from waste and actions to facilitate implementation of energy efficient technology in the Baltic Sea region within the waste-to-energy area. The focus is to utilise waste from cities, farming and industry for energy purposes in an efficient way. The project seeks to facilitate the implementation of sustainable systems for waste-to-energy in the Baltic Sea region and specifically, in a first step, in the project partner regions. The project's duration is 12/2009-12/2012. This report is structured into 8 chapters, which are further divided into subchapters if needed. Relevant data about current situation about waste generation and management in partner regions of REMOWE project are described in Chapter 1. There are guidelines on action plan and strategies for regional policy makers, SME's and the general public to mobilize waste to energy production in Chapter 2. Beside guidelines, this report contains references to basic political acts of waste and energy management of EU and best practices of implementation them in regional level (Chapter 3). The focus of Chapters 4 and 5 is on energetic potential of waste and technologies for utilisation of waste for energy purposes. During the project period in each of partner region innovation processes were realised and innovation ides evaluated, basic results are collected into

  16. Guidance Manual for preparing Nuclear and Radiological Emergency Preparedness and Response Plan

    Energy Technology Data Exchange (ETDEWEB)

    Muhammed, Kabiru [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Jeong, Seung-Young [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2014-10-15

    The Nuclear and Radiological Emergency Preparedness and Response Plan(NREPRP) describes the capabilities, responsibilities and authorities of government agencies and a conceptual basis for integrating the activities of these agencies to protect public health and safety. The NREPRP addresses issues related to actual or perceived radiation hazard requiring a national response in order to: i. Provide co-ordination of a response involving multi-jurisdictions or significant national responsibilities; or ii. Provide national support to state and local governments. The objective of this research is to establish Guidance Manual for preparing a timely, organized and coordinated emergency response plan for Authorities/agencies to promptly and adequately determine and take actions to protect members of the public and emergency workers. The manual will not provide sufficient details for an adequate response. This level of details is contained in standard operating procedures that are being developed based on the plan developed. Base on the data obtain from integrated planning levels and responsibility sharing, the legal document of major government agencies participating in NREPRP form the legal basis for the response plan. Also the following documents should be some international legal binding documents. Base on the international safety requirement and some countries well developed NREPRP, we have drafted a guidance manual for new comer countries for easy development of their countries NREPRP. Also we have taken in to consideration lessons learn from most accident especially Fukushima accident.

  17. Guidance Manual for preparing Nuclear and Radiological Emergency Preparedness and Response Plan

    International Nuclear Information System (INIS)

    Muhammed, Kabiru; Jeong, Seung-Young

    2014-01-01

    The Nuclear and Radiological Emergency Preparedness and Response Plan(NREPRP) describes the capabilities, responsibilities and authorities of government agencies and a conceptual basis for integrating the activities of these agencies to protect public health and safety. The NREPRP addresses issues related to actual or perceived radiation hazard requiring a national response in order to: i. Provide co-ordination of a response involving multi-jurisdictions or significant national responsibilities; or ii. Provide national support to state and local governments. The objective of this research is to establish Guidance Manual for preparing a timely, organized and coordinated emergency response plan for Authorities/agencies to promptly and adequately determine and take actions to protect members of the public and emergency workers. The manual will not provide sufficient details for an adequate response. This level of details is contained in standard operating procedures that are being developed based on the plan developed. Base on the data obtain from integrated planning levels and responsibility sharing, the legal document of major government agencies participating in NREPRP form the legal basis for the response plan. Also the following documents should be some international legal binding documents. Base on the international safety requirement and some countries well developed NREPRP, we have drafted a guidance manual for new comer countries for easy development of their countries NREPRP. Also we have taken in to consideration lessons learn from most accident especially Fukushima accident

  18. 'Tell us something we don't already know or do!' - The response of planning and transport professionals to public health guidance on the built environment and physical activity.

    Science.gov (United States)

    Allender, Steven; Cavill, Nick; Parker, Mike; Foster, Charles

    2009-04-01

    A large proportion of non-communicable disease can be attributed to modifiable risk factors such as poor nutrition and physical inactivity. We present data on planning and transport practitioners' perceptions and responses to government public health guidance aimed at modifying environmental factors to promote physical activity. This study was informed by questions on the role of evidence-based guidance, the views of professionals towards the guidance, the links between guidance and existing legislation and policy and the practicality of guidelines. A key informant 'snowball' sampling technique was used to recruit participants from the main professional planning organisations across England. Seventy-six people were interviewed in eight focus groups. We found that evidence-based public health guidance is a new voice in urban and town planning, although much of the advice is already reflected by the 'accepted wisdom' of these professions. Evidence-based health guidance could be a powerful driver affecting planning practice, but other legislated planning guidance may take priority for planning and transport professionals.

  19. Preparation of site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This safety guidelines is issued as a lead document to facilitate preparation of specific site manuals by the responsible organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publications on the subject: Safety manual on site emergency plan on nuclear installations. AERB/SM/NISD-1, 1986 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come about in a significant manner after the accidents at Chernobyl and Bhopal

  20. Sensitivity mapping for oil spill response. V. 1

    International Nuclear Information System (INIS)

    1997-01-01

    Making and updating sensitivity maps are key activities in the oil spill contingency planning process. These maps convey essential information to spill responders by showing where the different coastal resources are, and by indicating environmentally sensitive areas. The making of a map involves assembling information on resources and deciding on what guidelines for spill response should be included, through consultation with relevant organizations. This can be done regardless of whether or not the benefits of computerized Geographic Information Systems and databases are available. Uses of sensitivity maps range from planning practical site-specific shore protection and clean-up to strategic planning for large remote areas. This report provides information and guidelines on different map types, categories of information to be included, and symbols, with reference to the different users and their requirements. (UK)

  1. Field Campaign Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Voyles, J. W. [DOE ARM Climate Research Facility, Washington, DC (United States); Chapman, L. A. [DOE ARM Climate Research Facility, Washington, DC (United States)

    2015-12-01

    This document establishes a common set of guidelines for the Atmospheric Radiation Measurement (ARM) Climate Research Facility for planning, executing, and closing out field campaigns. The steps that guide individual field campaigns are described in the Field Campaign Tracking System and are specifically tailored to meet the scope of each field campaign.

  2. Radiological emergency: Malaysian preparedness and response

    International Nuclear Information System (INIS)

    Yusof, M. A. W.; Ali, H. M.

    2011-01-01

    Planning and preparation in advance for radiological emergencies can help to minimise potential public health and environmental threats if and when an actual emergency occurs. During the planning process, emergency response organisations think through how they would respond to each type of incident and the resources that will be needed. In Malaysia, planning, preparation for and response to radiological emergencies involve many parties. In the event of a radiological emergency and if it is considered a disaster, the National Security Council, the Atomic Energy Licensing Board and the Malaysian Nuclear Agency (Nuclear Malaysia) will work together with other federal agencies, state and local governments, first responders and international organisations to monitor the situation, contain the release, and clean up the contaminated site. Throughout the response, these agencies use their protective action guidelines. This paper discusses Malaysian preparedness for, and response to, any potential radiological emergency. (authors)

  3. Using principles from emergency management to improve emergency response plans for research animals.

    Science.gov (United States)

    Vogelweid, Catherine M

    2013-10-01

    Animal research regulatory agencies have issued updated requirements for emergency response planning by regulated research institutions. A thorough emergency response plan is an essential component of an institution's animal care and use program, but developing an effective plan can be a daunting task. The author provides basic information drawn from the field of emergency management about best practices for developing emergency response plans. Planners should use the basic principles of emergency management to develop a common-sense approach to managing emergencies in their facilities.

  4. Dynamic sensorimotor planning during long-term sequence learning: the role of variability, response chunking and planning errors.

    Science.gov (United States)

    Verstynen, Timothy; Phillips, Jeff; Braun, Emily; Workman, Brett; Schunn, Christian; Schneider, Walter

    2012-01-01

    Many everyday skills are learned by binding otherwise independent actions into a unified sequence of responses across days or weeks of practice. Here we looked at how the dynamics of action planning and response binding change across such long timescales. Subjects (N = 23) were trained on a bimanual version of the serial reaction time task (32-item sequence) for two weeks (10 days total). Response times and accuracy both showed improvement with time, but appeared to be learned at different rates. Changes in response speed across training were associated with dynamic changes in response time variability, with faster learners expanding their variability during the early training days and then contracting response variability late in training. Using a novel measure of response chunking, we found that individual responses became temporally correlated across trials and asymptoted to set sizes of approximately 7 bound responses at the end of the first week of training. Finally, we used a state-space model of the response planning process to look at how predictive (i.e., response anticipation) and error-corrective (i.e., post-error slowing) processes correlated with learning rates for speed, accuracy and chunking. This analysis yielded non-monotonic association patterns between the state-space model parameters and learning rates, suggesting that different parts of the response planning process are relevant at different stages of long-term learning. These findings highlight the dynamic modulation of response speed, variability, accuracy and chunking as multiple movements become bound together into a larger set of responses during sequence learning.

  5. 29 CFR 1608.11 - Limitations on the application of these guidelines.

    Science.gov (United States)

    2010-07-01

    ... Guidelines are applicable only with respect to the circumstances described in § 1608.1(d), of this part. They... complained of, these Guidelines are inapplicable. (c) Currency of plan or program. Under section 713(b)(1), persons may rely on the plan or program only during the time when it is current. Currency is related to...

  6. Guidelines for a radiology department

    International Nuclear Information System (INIS)

    1981-05-01

    This manual presents guidelines for hospitals on a radiology quality assurance and dose measurement audit program and a system of planned actions that monitor and record the performance and effectiveness of the radiological service

  7. Guidelines for Guidelines: Are They Up to the Task? A Comparative Assessment of Clinical Practice Guideline Development Handbooks

    Science.gov (United States)

    Ansari, Shabnam; Rashidian, Arash

    2012-01-01

    Objectives We conducted a comparative review of clinical practice guideline development handbooks. We aimed to identify the main guideline development tasks, assign weights to the importance of each task using expert opinions and identify the handbooks that provided a comprehensive coverage of the tasks. Methods We systematically searched and included handbooks published (in English language) by national, international or professional bodies responsible for evidenced-based guideline development. We reviewed the handbooks to identify the main guideline development tasks and scored each handbook for each task from 0 (the handbook did not mention the task) to 2 (the task suitably addressed and explained), and calculated a weighted score for each handbook. The tasks included in over 75% of the handbooks were considered as ‘necessary’ tasks. Result Nineteen guideline development handbooks and twenty seven main tasks were identified. The guideline handbooks’ weighted scores ranged from 100 to 220. Four handbooks scored over 80% of the maximum possible score, developed by the National Institute for Health and Clinical Excellence, Swiss Centre for International Health, Scottish Intercollegiate Guidelines Network and World Health Organization. Necessary tasks were: selecting the guideline topic, determining the guideline scope, identifying relevant existing guidelines, involving the consumers, forming guideline development group,, developing clinical questions, systematic search for evidence, selecting relevant evidence, appraising identifies research evidence, making group decision, grading available evidence, creating recommendations, final stakeholder consultation, guideline implementation strategies, updating recommendations and correcting potential errors. Discussion Adequate details for evidence based development of guidelines were still lacking from many handbooks. The tasks relevant to ethical issues and piloting were missing in most handbooks. The findings

  8. Spatial planning of wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-01-01

    This paper proposes guidelines for spatial planning for wind power, based on experience with spatial planning in Belgium, Denmark, France and the Netherlands. In addition experiences from Germany and Ireland have been used. This guidelines quotes all decisive criteria for successful implementation of wind energy: landscape integration, stakeholders involvement, noise and distance from buildings. (author)

  9. Formalization of Medical Guidelines

    Czech Academy of Sciences Publication Activity Database

    Peleška, Jan; Anger, Z.; Buchtela, David; Šebesta, K.; Tomečková, Marie; Veselý, Arnošt; Zvára, K.; Zvárová, Jana

    2005-01-01

    Roč. 1, - (2005), s. 133-141 ISSN 1801-5603 R&D Projects: GA AV ČR 1ET200300413 Institutional research plan: CEZ:AV0Z10300504 Keywords : GLIF model * formalization of guidelines * prevention of cardiovascular diseases Subject RIV: IN - Informatics, Computer Science

  10. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  11. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  12. 33 CFR 155.1045 - Response plan requirements for vessels carrying oil as a secondary cargo.

    Science.gov (United States)

    2010-07-01

    ... PREVENTION REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1045 Response plan requirements... actions. (4) The organizational structure that will be used to manage the response actions. This structure... with government agencies; (v) Spill response operations; (vi) Planning; (vii) Logistics support; and...

  13. 33 CFR Appendix D to Part 154 - Training Elements for Oil Spill Response Plans

    Science.gov (United States)

    2010-07-01

    ... Appendix D to Part 154—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan dealing with training is one of the key elements of a response plan. This concept is clearly expressed by... that the plans often do not provide sufficient information in the training section of the plan for...

  14. Preliminary waste acceptance requirements for the planned Konrad repository

    International Nuclear Information System (INIS)

    Warnecke, E.; Brennecke, P.

    1987-01-01

    The Physikalisch-Technische Bundesanstalt (PTB) has established Preliminary Waste Acceptance Requirements for the planned Konrad repository. These requirements were developed, in accordance with the Safety Criteria of the Reactor Safety Commission, with the help of a site specific safety assessment; they are under the reservation of the plan approval procedure, which is still in progress. In developing waste acceptance requirements, the PTB fulfills one of its duties as the institute responsible for waste disposal and gives guidelines for waste conditioning to waste producers and conditioners. (orig.) [de

  15. Guidelines for state ITS/CVO business plans

    Science.gov (United States)

    1997-02-01

    This technical memorandum was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national progr...

  16. Hanford Surplus Facilities Program plan

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1989-09-01

    The Hanford Surplus Facilities Program is responsible for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The management of these facilities requires a surveillance and maintenance program to keep them in a safe condition and development of a plan for ultimate disposition. Criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy-Richland Operations Office, Defense Facilities Decommissioning Program Office, and are consistent with the Westinghouse Hanford Company commitment to decommission the Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities to the end of disposition

  17. National response plan - Major nuclear or radiological accidents

    International Nuclear Information System (INIS)

    2014-02-01

    France has been implementing stringent radiation protection and nuclear safety and security measures for many years. However, this does not mean that the country is exempt from having to be prepared to deal with an emergency. Changes in France, Europe and other parts of the globe have made it necessary for France to reconsider how it responds to nuclear and radiological emergencies. As the potential impact of a nuclear or radiological accident can affect a wide range of activities, the plan described herein is based on a cross-sector and inter-ministerial approach to emergency response. The Chernobyl and Fukushima-Daiichi disasters are proof that the consequences of a major nuclear or radiological accident can affect all levels of society. These challenges are substantial and relate to: public health: An uncontrolled nuclear accident can have immediate consequences (death, injury, irradiation) as well as long-term consequences that can lead to increased risk of developing radiation-induced diseases (such as certain types of cancer); environmental quality: Radiation contamination can last for several decades and, in some cases, can result in an area being closed off permanently to the public; economic and social continuity: Nuclear accidents bring human activity to a halt in contaminated areas, disrupting the economic and social order of the entire country. It may therefore be necessary to adapt economic and social systems and carry out clean-up operations if people and businesses have been displaced; quality of international relations: Related to fulfillment of obligations to alert and inform European and international partners. This international dimension also covers the protection of French nationals present in countries stricken by a nuclear accident. This national plan provides reference information on how to prepare for a nuclear or radiological emergency and make the appropriate decisions in the event of an emergency. It covers the emergency phase (including

  18. Time orientation, planning horizons and responsibility into the future

    International Nuclear Information System (INIS)

    Svenson, O.; Nilsson, G.

    1988-01-01

    Subjects of four categories (social science students, engineering students, retired people and nuclear waste experts) were asked about past events, planning, risks and future time with emphasis on energy related issues and in particular questions concerning spent nuclear waste. Among, the results reported it was found that events in the past were located more or less correctly and that events further back systematically too close to the present. Today's responsibility into the future was judged to cover 3 to 6 generations ahead and an adequate planning horizon for a local community to be on the average 11 to 14 years. Adequate planning horizons for the handling of spent nuclear fuel were judged to be from 100 to 500 years. The responsibility for effects of today's decisions was judged to be from about 100 to 300 years into the future for environmental pollution and from about 50 to 600 years for nuclear waste. However, non-negliqable proportions of the subjects choose a more moral standpoint and gave answers indicating that responsibility had to be unlimited. Some sex differences were found and an interaction with age offered as a hypothesis to be investigated in the future. Interrelations between clusters of questions revealed some links from past time and planning to judgements of environmental and nuclear power related risks. (orig.)

  19. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs

  20. SU-E-P-38: Comparison of Capri Applicator HDR Planning Methods to Meet the NCCN Uterine Neoplasm 2.2015 Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Klash, S; Steinman, J [Radphys Oncology Services, LLC, Knoxville, TN (United States); Stanley, T [CCS Oncology Center, Kenmore, NY (United States); Kim, D; Yi, S [CCS Oncology, Williamsville, NY (United States); Yap, J [CCS Oncology, Williamsville, New York (United States)

    2015-06-15

    Purpose: To establish a systematic planning approach for Capri intravaginal multichannel balloon applicators that meet updated Version 2.2015 NCCN guidelines for uterine neoplasms, which dictate delivery of 400 to 600 cGy in 2 to 3 fractions prescribed to the vaginal mucosa for HDR combined with EBRT as well as a regimen of 600 cGy x 5 (to the vaginal mucosa) for HDR brachytherapy alone. Methods: Studies have shown three different channel configurations of the Capri applicator are optimal for dosimetric conformity: central channel combined with the six inner ring channels (R12), all inner and outer ring channels (R23), or all thirteen channels (R123). To minimize the dose to the vaginal mucosa, a traditional 0.5cm expansion contour from the Capri surface was created. Optimization limits were set to push 600 cGy to 100% of the Capri volume, while simultaneously restricting dose to the expansion contour. Results: Plans were created using all three configurations (R12, R23, R123) and evaluated to determine which was best for delivering 600 cGy to the vaginal mucosa. Our criteria was: Capri V100 > 98%, Vaginal Mucosa Dmax < 125%, Bladder Dmax < 100%, Rectum Dmax < 100%. All configurations show Capri V100 values greater than 98.5%, with differences between plans varying by less than 1%. Vaginal mucosal Dmax values showed differences of roughly 5% of prescription. The R12 configuration proved the lowest vaginal mucosa Dmax, on average. The OAR Dmax values showed an average dose difference of roughly 2% of prescription, with the R23 configuration having the best results. Conclusion: The R12 channel configuration optimally fits our planning criteria and NCCN guidelines for 600 cGy prescribed to the vaginal mucosa. On average, it produced the highest Capri V100, the lowest vaginal mucosal Dmax, and a marginally higher OAR Dmax doses compared to the R23 and R123 plans.

  1. SU-E-P-38: Comparison of Capri Applicator HDR Planning Methods to Meet the NCCN Uterine Neoplasm 2.2015 Guidelines

    International Nuclear Information System (INIS)

    Klash, S; Steinman, J; Stanley, T; Kim, D; Yi, S; Yap, J

    2015-01-01

    Purpose: To establish a systematic planning approach for Capri intravaginal multichannel balloon applicators that meet updated Version 2.2015 NCCN guidelines for uterine neoplasms, which dictate delivery of 400 to 600 cGy in 2 to 3 fractions prescribed to the vaginal mucosa for HDR combined with EBRT as well as a regimen of 600 cGy x 5 (to the vaginal mucosa) for HDR brachytherapy alone. Methods: Studies have shown three different channel configurations of the Capri applicator are optimal for dosimetric conformity: central channel combined with the six inner ring channels (R12), all inner and outer ring channels (R23), or all thirteen channels (R123). To minimize the dose to the vaginal mucosa, a traditional 0.5cm expansion contour from the Capri surface was created. Optimization limits were set to push 600 cGy to 100% of the Capri volume, while simultaneously restricting dose to the expansion contour. Results: Plans were created using all three configurations (R12, R23, R123) and evaluated to determine which was best for delivering 600 cGy to the vaginal mucosa. Our criteria was: Capri V100 > 98%, Vaginal Mucosa Dmax < 125%, Bladder Dmax < 100%, Rectum Dmax < 100%. All configurations show Capri V100 values greater than 98.5%, with differences between plans varying by less than 1%. Vaginal mucosal Dmax values showed differences of roughly 5% of prescription. The R12 configuration proved the lowest vaginal mucosa Dmax, on average. The OAR Dmax values showed an average dose difference of roughly 2% of prescription, with the R23 configuration having the best results. Conclusion: The R12 channel configuration optimally fits our planning criteria and NCCN guidelines for 600 cGy prescribed to the vaginal mucosa. On average, it produced the highest Capri V100, the lowest vaginal mucosal Dmax, and a marginally higher OAR Dmax doses compared to the R23 and R123 plans

  2. Best Practice No 177: Best practice guideline: writing a business case for service development in pathology.

    Science.gov (United States)

    Galloway, M J

    2004-04-01

    This guideline reviews the introduction and development of business planning in the National Health Service. A guideline for writing a business case for service development that would form part of a pathology business plan has been developed. This guideline outlines six steps that are required in the preparation of a business case. The format of the guideline has been developed largely from other national guidelines that have been published for the development of capital projects. In view of the publication of these guidelines, the scope of this guideline excludes business cases for information, management, and technology projects and large capital projects.

  3. Emergency response planning for transport accidents involving radioactive materials

    International Nuclear Information System (INIS)

    1982-03-01

    The document presents a basic discussion of the various aspects and philosophies of emergency planning and preparedness along with a consideration of the problems which might be encountered in a transportation accident involving a release of radioactive materials. Readers who are responsible for preparing emergency plans and procedures will have to decide on how best to apply this guidance to their own organizational structures and will also have to decide on an emergency planning and preparedness philosophy suitable to their own situations

  4. 5 CFR 1310.1 - Policy guidelines.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Policy guidelines. 1310.1 Section 1310.1 Administrative Personnel OFFICE OF MANAGEMENT AND BUDGET OMB DIRECTIVES OMB CIRCULARS § 1310.1 Policy guidelines. In carrying out its responsibilities, the Office of Management and Budget issues policy guidelines to...

  5. 30 CFR 254.7 - How do I submit my response plan to the MMS?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false How do I submit my response plan to the MMS... do I submit my response plan to the MMS? You must submit the number of copies of your response plan that the appropriate MMS regional office requires. If you prefer to use improved information technology...

  6. Medical Malpractice Implications of Clinical Practice Guidelines.

    Science.gov (United States)

    Ruhl, Douglas S; Siegal, Gil

    2017-08-01

    Clinical practice guidelines aim to improve medical care by clarifying and making useful recommendations to providers. Although providers should account for patients' unique characteristics when determining a treatment plan, it is generally perceived as good practice to follow guidelines when applicable. This is of interest in malpractice litigation, where it is essential to establish a standard of care to evaluate the performances of providers. Although the opinions of expert witnesses are used to determine standards of care, guidelines are expected to play a leading role. Guidelines alone should not establish a legal standard but may help inform this discussion in the courtroom. Therefore, it is incumbent that excellent, practical, and timely guidelines are continually created and updated in a transparent way. These guidelines must be very clear and underscore the various strengths of recommendation based on the quality of available evidence.

  7. Guidelines for Planning the School Breakfast Program. Revised.

    Science.gov (United States)

    Georgia State Dept. of Education, Atlanta. Office of School Administrative Services.

    Some of the factors considered in these guidelines include basic nutritional requirements, food component minimums, food variety, and amounts of food served in elementary and secondary school breakfast programs. Suggestions are made for serving foods that will appeal to young people. Samples of hot and cold menus are provided. Forms for evaluating…

  8. 45 CFR 673.5 - Emergency response plan.

    Science.gov (United States)

    2010-10-01

    ... ensure that: (a) The vessel owner's or operator's shipboard oil pollution emergency plan, prepared and... Pollution from Ships, 1973, as modified by the Protocol of 1978 relating thereto (MARPOL 73/78), has provisions for prompt and effective response action to such emergencies as might arise in the performance of...

  9. The updating of clinical practice guidelines: insights from an international survey

    Directory of Open Access Journals (Sweden)

    Solà Ivan

    2011-09-01

    Full Text Available Abstract Background Clinical practice guidelines (CPGs have become increasingly popular, and the methodology to develop guidelines has evolved enormously. However, little attention has been given to the updating process, in contrast to the appraisal of the available literature. We conducted an international survey to identify current practices in CPG updating and explored the need to standardize and improve the methods. Methods We developed a questionnaire (28 items based on a review of the existing literature about guideline updating and expert comments. We carried out the survey between March and July 2009, and it was sent by email to 106 institutions: 69 members of the Guidelines International Network who declared that they developed CPGs; 30 institutions included in the U.S. National Guideline Clearinghouse database that published more than 20 CPGs; and 7 institutions selected by an expert committee. Results Forty-four institutions answered the questionnaire (42% response rate. In the final analysis, 39 completed questionnaires were included. Thirty-six institutions (92% reported that they update their guidelines. Thirty-one institutions (86% have a formal procedure for updating their guidelines, and 19 (53% have a formal procedure for deciding when a guideline becomes out of date. Institutions describe the process as moderately rigorous (36% or acknowledge that it could certainly be more rigorous (36%. Twenty-two institutions (61% alert guideline users on their website when a guideline is older than three to five years or when there is a risk of being outdated. Twenty-five institutions (64% support the concept of "living guidelines," which are continuously monitored and updated. Eighteen institutions (46% have plans to design a protocol to improve their guideline-updating process, and 21 (54% are willing to share resources with other organizations. Conclusions Our study is the first to describe the process of updating CPGs among prominent

  10. Feasibility of implementing a practice guideline for fall prevention on geriatric wards: a multicentre study.

    Science.gov (United States)

    Milisen, Koen; Coussement, Joke; Arnout, Hanne; Vanlerberghe, Virginie; De Paepe, Leen; Schoevaerdts, Didier; Lambert, Margareta; Van Den Noortgate, Nele; Delbaere, Kim; Boonen, Steven; Dejaeger, Eddy

    2013-04-01

    About 40% of all adverse events in hospital are falls, but only about one in three Belgian hospitals have a fall prevention policy in place. The implementation of a national practice guideline is urgently needed. This multicentre study aimed to determine the feasibility of a previously developed guideline. SETTING, PARTICIPANTS AND METHOD: Seventeen geriatric wards, selected at random out of 40 Belgian hospitals who agreed to take part in the study, evaluated the fall prevention guideline. After the one-month test period, 49 healthcare workers completed a questionnaire on the feasibility of the guideline. At the end of the study, 512 geriatric patients had been assessed using the practice guideline. The average time spent per patient on case finding, multifactorial assessment and initiating a treatment plan was 5.1, 76.1 and 30.6 min, respectively. For most risk assessments and risk modifications, several disciplines considered themselves as being responsible and capable. The majority (more than 69%) of the respondents judged the practice guideline as useful, but only a small majority (62.3%) believed that the guideline could be successfully integrated into their daily practice over a longer period of time. Barriers for implementation included a large time investment (81.1%), lack of communication between the different disciplines (35.8%), lack of motivation of the patient (34.0%), lack of multidisciplinary teamwork (28.3%), and lack of interest from the hospital management (15.4%). Overall, the guideline was found useful, and for each risk factor (except for visual impairment), at least one discipline felt responsible and capable. Towards future implementation of the guideline, following steps should be considered: division of the risk-factor assessment duties and interventions among different healthcare workers; patient education; appointment of a fall prevention coordinator; development of a fall prevention policy with support from the management of the hospital

  11. The nuclear medicine department in the emergency management plan: a referent structure for the nuclear and radiological risks

    International Nuclear Information System (INIS)

    Barat, J.L.; Ducassou, D.; Lesgourgues, P.; Zamaron, S.; Boulard, G.

    2006-01-01

    Each french public or private hospital has to establish guidelines for an immediate response to mass casualties (Emergency Management Plan or 'White' Plan). For a nuclear accident or terrorist attack, the staff of the Nuclear Medicine Department may be adequately prepared and equipped. This paper presents the nuclear and radiological risks section of the final draft of the White Plan developed at Bordeaux University Hospital. (author)

  12. An investigation of face and fingerprint feature-fusion guidelines

    CSIR Research Space (South Africa)

    Brown, Dane

    2016-05-01

    Full Text Available There are a lack of multi-modal biometric fusion guidelines at the feature-level. This paper investigates face and fingerprint features in the form of their strengths and weaknesses. This serves as a set of guidelines to authors that are planning...

  13. Public comments and responses to the 1991 Hanford Cleanup Five-Year Plan

    International Nuclear Information System (INIS)

    1992-05-01

    The Department of Energy (DOE) Richland Field Office (RL) updated its Site-Specific Plan (DOE-RL 1991a) dealing with cleanup and operation of the Hanford Site in September 1991. The plan provides direction as to how DOE will carry out the national strategy for managing and cleaning up the Hanford Site wastes resulting from production of nuclear weapons. The plan is updated annually. We asked the public to comment on the plan during its 60-day public comment period. This report presents the comments and provides responses. The introduction explains how the comments were gathered and how we responded. This report is in four main sections: (1) comments and responses addressed locally; (2) comments forwarded to DOE-Headquarters for their response (these responses will appear in the National Five-Year Plan [DOE 1991a]); (3) comments we did not respond to here because they were outside the scope, or about how we gathered the public's comments; and (4) the appendices, which include a glossary, a list of acronyms used in the document, and the letters and cards we received reproduced in their entirety

  14. Surplus Facilities and Resource Conservation and Recovery Act Closure program plan, fiscal year 1992

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1991-10-01

    The Surplus Facilities and Resource Conservation and Recovery Act Closure program is responsible to US Department of Energy Field Office, Richland for the safe, cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The Surplus Facilities and Resource Conservation and Recovery Act Closure program is also responsible to US Department of Energy Field Office, Richland for the program management of specific Resource Conservation and Recovery Act closures at the Hanford Site. This program plan addresses only the surplus facilities. The criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy Field Office, Richland, Environmental Restoration Division. The guidelines are consistent with the Westinghouse Hanford Company commitment to decommission Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities until disposal

  15. Integrating guideline development and implementation: analysis of guideline development manual instructions for generating implementation advice

    Directory of Open Access Journals (Sweden)

    Gagliardi Anna R

    2012-07-01

    Full Text Available Abstract Background Guidelines are important tools that inform healthcare delivery based on best available research evidence. Guideline use is in part based on quality of the guidelines, which includes advice for implementation and has been shown to vary. Others hypothesized this is due to limited instructions in guideline development manuals. The purpose of this study was to examine manual instructions for implementation advice. Methods We used a directed and summative content analysis approach based on an established framework of guideline implementability. Six manuals identified by another research group were examined to enumerate implementability domains and elements. Results Manuals were similar in content but lacked sufficient detail in particular domains. Most frequently this was Accomodation, which includes information that would help guideline users anticipate and/or overcome organizational and system level barriers. In more than one manual, information was also lacking for Communicability, information that would educate patients or facilitate their involvement in shared decision making, and Applicability, or clinical parameters to help clinicians tailor recommendations for individual patients. Discussion Most manuals that direct guideline development lack complete information about incorporating implementation advice. These findings can be used by those who developed the manuals to consider expanding their content in these domains. It can also be used by guideline developers as they plan the content and implementation of their guidelines so that the two are integrated. New approaches for guideline development and implementation may need to be developed. Use of guidelines might be improved if they included implementation advice, but this must be evaluated through ongoing research.

  16. Nuclear emergency planning and response in the Netherlands after Chernobyl

    International Nuclear Information System (INIS)

    Bergman, L.J.W.M.; Kerkhoven, I.P.

    1989-01-01

    After Chernobyl an extensive project on nuclear emergency planning and response was started in the Netherlands. The objective of this project was to develop a (governmental) structure to cope with accidents with radioactive materials, that can threaten the Dutch community and neighbouring countries. The project has resulted in a new organizational structure for nuclear emergency response, that differs on major points from the existing plans and procedures. In this paper an outline of the new structure is given. Emphasis is placed on accidents with nuclear power plants

  17. Guidelines for computer security in general practice.

    Science.gov (United States)

    Schattner, Peter; Pleteshner, Catherine; Bhend, Heinz; Brouns, Johan

    2007-01-01

    As general practice becomes increasingly computerised, data security becomes increasingly important for both patient health and the efficient operation of the practice. To develop guidelines for computer security in general practice based on a literature review, an analysis of available information on current practice and a series of key stakeholder interviews. While the guideline was produced in the context of Australian general practice, we have developed a template that is also relevant for other countries. Current data on computer security measures was sought from Australian divisions of general practice. Semi-structured interviews were conducted with general practitioners (GPs), the medical software industry, senior managers within government responsible for health IT (information technology) initiatives, technical IT experts, divisions of general practice and a member of a health information consumer group. The respondents were asked to assess both the likelihood and the consequences of potential risks in computer security being breached. The study suggested that the most important computer security issues in general practice were: the need for a nominated IT security coordinator; having written IT policies, including a practice disaster recovery plan; controlling access to different levels of electronic data; doing and testing backups; protecting against viruses and other malicious codes; installing firewalls; undertaking routine maintenance of hardware and software; and securing electronic communication, for example via encryption. This information led to the production of computer security guidelines, including a one-page summary checklist, which were subsequently distributed to all GPs in Australia. This paper maps out a process for developing computer security guidelines for general practice. The specific content will vary in different countries according to their levels of adoption of IT, and cultural, technical and other health service factors. Making

  18. Systematic Review of Clinical Practice Guidelines for Failed Antidepressant Treatment Response in Major Depressive Disorder, Dysthymia, and Subthreshold Depression in Adults.

    Science.gov (United States)

    MacQueen, Glenda; Santaguida, Pasqualina; Keshavarz, Homa; Jaworska, Natalia; Levine, Mitchell; Beyene, Joseph; Raina, Parminder

    2017-01-01

    This systematic review critically evaluated clinical practice guidelines (CPGs) for treating adults with major depressive disorder, dysthymia, or subthreshold or minor depression for recommendations following inadequate response to first-line treatment with selective serotonin reuptake inhibitors (SSRIs). Searches for CPGs (January 2004 to November 2014) in English included 7 bibliographic databases and grey literature sources using CPG and depression as the keywords. Two raters selected CPGs on depression with a national scope. Data extraction included definitions of adequate response and recommended treatment options. Two raters assessed quality using the Appraisal of Guidelines for Research and Evaluation II (AGREE II) instrument. From 46,908 citations, 3167 were screened at full text. From these 21 CPG were applicable to adults in primary care and outpatient settings. Five CPGs consider patients with dysthymia or subthreshold or minor depression. None provides recommendations for those who do not respond to first-line SSRI treatment. For adults with MDD, most CPGs do not define an "inadequate response" or provide specific suggestions regarding how to choose alternative medications when switching to an alternative antidepressant. There is variability between CPGs in recommending combination strategies. AGREE II ratings for stakeholder involvement in CPG development, editorial independence, and rigor of development are domains in which depression guidelines are often less robust. About half of patients with depression require second-line treatment to achieve remission. Consistency and clarity in guidelines for second-line treatment of depression are therefore important for clinicians but lacking in most current guidelines. This may reflect a paucity of primary studies upon which to base conclusions.

  19. Formalization of 2007 ESH/ESC Hypertension Guidelines (HGL)

    Czech Academy of Sciences Publication Activity Database

    Peleška, Jan; Anger, Z.; Buchtela, David; Tomečková, Marie; Veselý, Arnošt; Zvárová, Jana; Zvolský, Miroslav

    2008-01-01

    Roč. 26, Suppl. 1 (2008), s. 302-302 ISSN 0952-1178. [ Hypertension 2008. 14.06.2008-19.06.2008, Berlin] R&D Projects: GA AV ČR 1ET200300413 Institutional research plan: CEZ:AV0Z10300504 Keywords : formalization of medical guidelines * 2007 ESH/ESC hypertension guidelines Subject RIV: FA - Cardiovascular Diseases incl. Cardiotharic Surgery

  20. Planning for off-site response to radiation accidents in nuclear facilities

    International Nuclear Information System (INIS)

    1981-01-01

    The purpose of this publication is to give guidance to those who are responsible for the protection of the public in the event of an accident occurring at a land-based nuclear facility. This guidance should assist in the advance preparation of emergency response plans and implementing procedures. Basic principles of protective measures along with their advantages and disadvantages are discussed. Other principles related to emergency planning and the operational response to an emergency are outlined. Although the guidance is primarily oriented towards land-based nuclear power facilities, the guidance does have general application to other types of nuclear facility

  1. Planning for off-site response to radiation accidents in nuclear facilities

    International Nuclear Information System (INIS)

    1979-01-01

    The purpose of this manual is to give guidance to those who are responsible for the protection of the public in the event of an accident occurring at a land-based nuclear facility. This guidance should assist in the advance preparation of emergency response plans and implementing procedures. Basic principles of protective measures along with their advantages and disadvantages are discussed. Other principles related to emergency planning and the operational response to an emergency are outlined. Although the guidance is primarily oriented toward land-based nuclear power facilities, the guidance does have general application to other types of nuclear facilities

  2. 10 CFR 436.102 - General operations plan format and content.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false General operations plan format and content. 436.102... PROGRAMS Guidelines for General Operations Plans § 436.102 General operations plan format and content. (a... effective date of these guidelines, a general operations 10-year plan which shall consist of two parts, an...

  3. Human performance evaluation: The procedures of ultimate response guideline for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Kang-Hung, E-mail: alvinks@iner.gov.tw [Institute of Nuclear Energy Research, Atomic Engery Council, No. 1000, Whenhua Road, Jiaan Village, Longtan Township, Taoyuan County, Taiwan (China); Hwang, Sheue-Ling, E-mail: slhwang@ie.nthu.edu.tw [Department of Industrial Engineering and Engineering Management, National Tsing Hua University, No. 101, Section 2, Kuang-Fu Road, Hsinchu, Taiwan 30013, Taiwan (China)

    2014-07-01

    Highlights: • This study adopts SPAR-H to evaluate HEPs in the URG procedures. • The involvement of URG procedures could reduce CDF significantly. • Upgrading the training level of staff will enhance the reliability effectively. • Aiding the plant manager in making URG decision will enhance the reliability. - Abstract: In the nuclear accident which occurred in Japan on March 11, 2011, several units of Fukushima conventional BWR experienced a total loss of power and water supply triggered by a heavy earthquake and subsequent Tsunami which were outside design models. In the past, when an accident occurred, operators in nuclear power plants (NPP) followed emergency operating procedures (EOPs) or severe accident management guidance (SAMG). However, EOP and SAMG are symptom-based procedures to cope with severe transients and accidents, depending on real-time operational parameters. Ultimate response guidelines (URG), a plant specific interim remedy action plan, was developed to manage accidents caused by compound disasters which exceed design models. The URG guides the plant operators’ conduct of reactor depressurization, core cooling water injection, and containment venting. This study adopts NUREG/CR-6883 (Standardized Plant Analysis Risk Human Reliability Analysis, SPAR-H) to evaluate human error probabilities (HEPs) of action and diagnosis in the current URG procedures. We found the human reliability of URG procedures analyzed by SPAR-H is about 85% (depending on different decision makers). Upgrading the training level of staff or enhancing plant managers ability to decide whether to execute URG will enhance the human reliability of URG procedures.

  4. Preservation of information about the repository for spent nuclear fuels - proposal for action plan

    International Nuclear Information System (INIS)

    Bowen-Schrire, Monica; Eckerhall, Daniel; Jander, Hans; Waniewska, Katarina

    2008-10-01

    This report is a proposal for an action plan with the ultimate aim of ensuring that information about the repository for spent nuclear fuel can be preserved and transferred for future generations. The purpose of the proposal for an action plan is to present ideas on tangible measures and guidelines for information preservation and transfer, in the short and long term. The report deals with a number of aspects relating to information preservation as well as risks that can lead to the loss of important information. The proposal for an action plan is based on reasoning about these subjects. The main emphasis is on measures that need to be implemented in the near future to ensure that successive and direct information transfer is handled in a suitable manner. It is suggested that the following measures should be implemented within a five-year period: - Designate a person responsible for information preservation. - Work out guidelines for information preservation and transfer. - Form a network with other organizations in Sweden. - Initiate a dialogue with other countries, especially USA and France. - Participate in seminars, conferences and workgroups on an international level within the IAEA and NEA. In a longer time perspective the following measures should also be implemented: - Implement guidelines for information preservation and transfer. - Document the archiving system. - Establish a communication plan. - Archive information about the repository. - Keep the action plan up to date

  5. Planning for Accessibility.

    Science.gov (United States)

    Spoor, Dana L.

    1997-01-01

    Argues that barrier-free designs should be incorporated in the first steps of school facility planning to avoid the difficulties in meeting Americans with Disabilities Act (ADA) guidelines during renovations. Explains why not all barriers need be removed to make a facility accessible to everyone. Discusses issues involving ADA guidelines and child…

  6. Guidelines on the Harmonization of Response and Assistance Capabilities for a Nuclear or Radiological Emergency. EPR-Harmonized Assistance Capabilities 2017

    International Nuclear Information System (INIS)

    2017-01-01

    The aim of this publication is to provide guidelines to Member States and relevant international organizations on processes and arrangements that may be implemented as part of emergency preparedness and response (EPR) arrangements to assist in harmonizing national EPR capabilities and international assistance, when requested so that the products of their response operations are comparable and compatible. This publication provides details on the types, contents and formats of data and mapping products that may be generated during a response to nuclear or radiological emergencies. The publication applies the safety principles stated in IAEA Safety Standards Series No. SF 1, Fundamental Safety Principles, primarily Principle 9 on EPR, and it will be of assistance to Member States in meeting the requirements established in IAEA Safety Standards Series No. GSR Part 7, Preparedness and Response for a Nuclear or Radiological Emergency. Requirement 17 of this publication establishes that the “government shall ensure that adequate arrangements are in place to benefit from, and to contribute to the provision of, international assistance for preparedness and response for a nuclear or radiological emergency.” As part of these arrangements, it is required that due account is taken of the “compatibility requirements for the capabilities to be obtained from and to be rendered to different States so as to ensure the usefulness of these capabilities.” These guidelines are intended to help Member States to ensure that compatible response and assistance capabilities are in place. This publication is intended to be used by national authorities involved in emergency preparedness and response, and national response teams in all States. The guidelines provided need to be adapted to fit a State’s particular organizational arrangements, language, terminology, concept of operation, and capabilities. However, the products generated need to be compatible with the types and formats

  7. INTERNATIONAL LABOUR LAW PRINCIPLES AS GUIDELINES TO FOSTEREMPLOYMENT RELATIONS

    Directory of Open Access Journals (Sweden)

    Aniko Noemi TURI

    2017-06-01

    Full Text Available Contemporary human resource management practices often ignore very important values of international labour law; however there is a wide floor for improvements in this area. In this sense the main guidelines are arising from the legal acts of the International organizations. The social responsibility, professional ethics and management are categories which have the intense relation with the legal system. Some historically developed degree of social responsibility and professional ethics may be considered as an important resource of values which are the starting point for building the legal system and also international regulations. The international labour law principles are significant elements in employment relations. The paper represents how the principles of the international labour law can positively influence managerial strategies through the social dialogue. Social dialogue provides a communication platform between social partners and by that it is actually creating a socio-economic and social development. Furthermore social dialogue is a key instrument in planning social development, harmonizing different interests, prevent and resolve disputes between the management and labour. International law shows many ways how to strengthen the principle of ethics in the employment relations. The values, arising from the existing international legal documents may be the significant guideline for the development of “good practices of managers”.

  8. Improving planning, design, reporting and scientific quality of animal experiments by using the Gold Standard Publication Checklist, in addition to the ARRIVE guidelines.

    Science.gov (United States)

    Hooijmans, Carlijn R; de Vries, Rob; Leenaars, Marlies; Curfs, Jo; Ritskes-Hoitinga, Merel

    2011-03-01

    Several studies have demonstrated serious omissions in the way research that use animals is reported. In order to improve the quality of reporting of animal experiments, the Animals in research: reporting in vivo experiments (ARRIVE) Guidelines were published in the British Journal of Pharmacology in August 2010. However, not only the quality of reporting of completed animal studies needs to be improved, but also the design and execution of new experiments. With both these goals in mind, we published the Gold Standard Publication Checklist (GSPC) in May 2010, a few months before the ARRIVE guidelines appeared. In this letter, we compare the GSPC checklist with the ARRIVE Guidelines. The GSPC describes certain items in more detail, which makes it both easier to use when designing and conducting an experiment and particularly suitable for making systematic reviews of animal studies more feasible. In order to improve not only the reporting but also the planning, design, execution and thereby, the scientific quality of animal experiments, we strongly recommend to all scientists involved in animal experimentation and to editors of journals publishing animal studies to take a closer look at the contents of both the ARRIVE guidelines and GSPC, and select the set of guidelines which is most appropriate for their particular situation. © 2011 The Authors. British Journal of Pharmacology © 2011 The British Pharmacological Society.

  9. An emergency response plan for transportation

    International Nuclear Information System (INIS)

    Fontaine, M.V.; Guerel, E.

    2000-01-01

    Transnucleaire is involved in road and rail transport of nuclear fuel cycle materials. To comply with IAEA recommendations, Transnucleaire has to master methods of emergency response in the event of a transport accident. Considering the utmost severe situations, Transnucleaire has studied several cases and focused especially on an accident involving a heavy cask. In France, the sub-prefect of each department is in charge of the organisation of the emergency teams. The sub-prefect may request Transnucleaire to supply experts, organisation, equipment and technical support. The Transnucleaire Emergency Response Plan covers all possible scenarios of land transport accidents and relies on: (i) an organisation ready for emergency situations, (ii) equipment dedicated to intervention, and (iii) training of its own experts and specialised companies. (author)

  10. The management of acute risks. Oil spill contingency planning and response

    International Nuclear Information System (INIS)

    Monk, D.C.; Cormack, D.

    1992-01-01

    It is clear that the risks of environmental damage can be best minimized by preventing oil spills from occurring at all. Since absolute prevention is unrealistic, however, early detection is essential and aerial surveillance techniques are of great value in this connection. If spills do occur, proper contingency planning and clean-up techniques can minimize impacts, but will rarely avoid them completely if the spilled oil reaches the coastline. It is evident that a main priority should be to prevent spilled oil reaching the coastline. The way in which oil spill response strategy is implemented is discussed in detail. It is based on four key elements: the allocation of responsibilities; contingency planning; training and exercises; regular audit of plans and response mechanisms. A case study of the oil spill strategy employed at the Sullom Voe oil terminal in Shetland is used as an illustration. (UK)

  11. Planning and Preparing for Emergency Response to Transport Accidents Involving Radioactive Material. Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide provides guidance on various aspects of emergency planning and preparedness for dealing effectively and safely with transport accidents involving radioactive material, including the assignment of responsibilities. It reflects the requirements specified in Safety Standards Series No. TS-R-1, Regulations for the Safe Transport of Radioactive Material, and those of Safety Series No. 115, International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. Contents: 1. Introduction; 2. Framework for planning and preparing for response to accidents in the transport of radioactive material; 3. Responsibilities for planning and preparing for response to accidents in the transport of radioactive material; 4. Planning for response to accidents in the transport of radioactive material; 5. Preparing for response to accidents in the transport of radioactive material; Appendix I: Features of the transport regulations influencing emergency response to transport accidents; Appendix II: Preliminary emergency response reference matrix; Appendix III: Guide to suitable instrumentation; Appendix IV: Overview of emergency management for a transport accident involving radioactive material; Appendix V: Examples of response to transport accidents; Appendix VI: Example equipment kit for a radiation protection team; Annex I: Example of guidance on emergency response to carriers; Annex II: Emergency response guide.

  12. Waste Minimization and Pollution Prevention Awareness Plan

    International Nuclear Information System (INIS)

    1992-01-01

    The purpose of this plan is to document the Lawrence Livermore National Laboratory (LLNL) Waste Minimization and Pollution Prevention Awareness Program. The plan specifies those activities and methods that are or will be employed to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy Department of Energy (DOE) and other legal requirements that are discussed in Section C, below. The Pollution Prevention Awareness Program is included with the Waste Minimization Program as suggested by DOE Order 5400.1. The intent of this plan is to respond to and comply with the Department's policy and guidelines concerning the need for pollution prevention. The Plan is composed of a LLNL Waste Minimization and Pollution Prevention Awareness Program Plan and, as attachments, Directorate-, Program- and Department-specific waste minimization plans. This format reflects the fact that waste minimization is considered a line management responsibility and is to be addressed by each of the Directorates, Programs and Departments. Several Directorates have been reorganized, necessitating changes in the Directorate plans that were published in 1991

  13. Guidelines and workbook for of organization and administration of utilities seeking operating license for a nuclear power plant. Workbook for assessment of organization and management. Volume, 2, Revision 1

    International Nuclear Information System (INIS)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1986-09-01

    This report is a partial response to the requirements of Item I.B.1.1 of the ''NRC Action Plan Developed as a Result of the TMI-2 Accident,'' NUREG-0660, and is designed to serve as a basis for replacing the earlier NUREG-0731, ''Guidelines for Utility Management Structure and Technical Resources.'' The Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The purpose of the Workbook is to guide the NRC reviewer through a systematic review and assessment of a proposed organization and administration. It is the NRC's intention to incorporate these Guidelines and Workbook into a future revision of the Standard Review Plan (SRP), NUREG-0800. However, at this time the report is being published so that the material may be used on a voluntary basis by industry to systematically prepare or evaluate their organization or administration plans. Use of the report by the NRC would not occur until after it has been incorporated in the SRP

  14. Comprehensive School Alienation Program, Guidelines.

    Science.gov (United States)

    Hawaii State Dept. of Education, Honolulu. Office of Instructional Services.

    This document presents guidelines developed by the Hawaii State Department of Education's Comprehensive School Alienation Program to consolidate and strengthen the delivery of services to alienated students. It is intended to assist district staff, school administrators, and project personnel in planning and implementing program activities and…

  15. Underground Test Area Activity Communication/Interface Plan, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro, Las Vegas, NV (United States); Rehfeldt, Kenneth [Navarro, Las Vegas, NV (United States)

    2016-10-01

    The purpose of this plan is to provide guidelines for effective communication and interfacing between Underground Test Area (UGTA) Activity participants, including the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and its contractors. This plan specifically establishes the following: • UGTA mission, vision, and core values • Roles and responsibilities for key personnel • Communication with stakeholders • Guidance in key interface areas • Communication matrix

  16. Guidelines for writing an argumentative essay

    OpenAIRE

    Aleksandra Egurnova

    2014-01-01

    The guidelines below are intended for teachers, professors, students, and the public at large who are interested in the issues of English writing culture. They provide a detailed plan for completing the writing task–writing an argumentative essay.

  17. Detecting and Responding to a Dengue Outbreak: Evaluation of Existing Strategies in Country Outbreak Response Planning

    Directory of Open Access Journals (Sweden)

    Julia Harrington

    2013-01-01

    Full Text Available Background. Dengue outbreaks are occurring with increasing frequency and intensity. Evidence-based epidemic preparedness and effective response are now a matter of urgency. Therefore, we have analysed national and municipal dengue outbreak response plans. Methods. Thirteen country plans from Asia, Latin America and Australia, and one international plan were obtained from the World Health Organization. The information was transferred to a data analysis matrix where information was extracted according to predefined and emerging themes and analysed for scope, inconsistencies, omissions, and usefulness. Findings. Outbreak response planning currently has a considerable number of flaws. Outbreak governance was weak with a lack of clarity of stakeholder roles. Late timing of responses due to poor surveillance, a lack of combining routine data with additional alerts, and lack of triggers for initiating the response weakened the functionality of plans. Frequently an outbreak was not defined, and early response mechanisms based on alert signals were neglected. There was a distinct lack of consideration of contextual influences which can affect how an outbreak detection and response is managed. Conclusion. A model contingency plan for dengue outbreak prediction, detection, and response may help national disease control authorities to develop their own more detailed and functional context specific plans.

  18. A bi-level integrated generation-transmission planning model incorporating the impacts of demand response by operation simulation

    International Nuclear Information System (INIS)

    Zhang, Ning; Hu, Zhaoguang; Springer, Cecilia; Li, Yanning; Shen, Bo

    2016-01-01

    Highlights: • We put forward a novel bi-level integrated power system planning model. • Generation expansion planning and transmission expansion planning are combined. • The effects of two sorts of demand response in reducing peak load are considered. • Operation simulation is conducted to reflect the actual effects of demand response. • The interactions between the two levels can guarantee a reasonably optimal result. - Abstract: If all the resources in power supply side, transmission part, and power demand side are considered together, the optimal expansion scheme from the perspective of the whole system can be achieved. In this paper, generation expansion planning and transmission expansion planning are combined into one model. Moreover, the effects of demand response in reducing peak load are taken into account in the planning model, which can cut back the generation expansion capacity and transmission expansion capacity. Existing approaches to considering demand response for planning tend to overestimate the impacts of demand response on peak load reduction. These approaches usually focus on power reduction at the moment of peak load without considering the situations in which load demand at another moment may unexpectedly become the new peak load due to demand response. These situations are analyzed in this paper. Accordingly, a novel approach to incorporating demand response in a planning model is proposed. A modified unit commitment model with demand response is utilized. The planning model is thereby a bi-level model with interactions between generation-transmission expansion planning and operation simulation to reflect the actual effects of demand response and find the reasonably optimal planning result.

  19. Characteristics of Effective Collaboration in Response to Diversified Transportation Planning Authority

    OpenAIRE

    John S. Miller

    2011-01-01

    Advantages of decentralized transportation planning responsibilities may include reduced project delivery cost, the integration of comprehensive long-range planning with regional land use, and greater accountability regarding local concerns. Yet disadvantages may include a tendency for operations to dominate longer-term planning, inconsistent operational standards, and difficulty in achieving network benefits, since some transportation links may provide benefits to the entire system but not ...

  20. Emergency planning, response and assessment: a concept for a center of excellence

    International Nuclear Information System (INIS)

    Dickerson, M.H.

    1986-01-01

    This paper discusses a general concept for a center of excellence devoted to emergency planning, response and assessment. A plan is presented to implement the concept, based on experience gained from emergency response as it relates to the nuclear and toxic chemical industries. The role of the World Laboratory in this endeavor would complement and enhance other organizations than are involved in related activities

  1. Development of quantitative methods for spill response planning: a trajectory analysis planner

    International Nuclear Information System (INIS)

    Galt, J.A.; Payton, D.L.

    1999-01-01

    In planning for response to oil spills, a great deal of information must be assimilated. Typically, geophysical flow patterns, ocean turbulence, complex chemical processes, ecological setting, fisheries activities, economics of land use, and engineering constraints on response equipment all need to be considered. This presents a formidable analysis problem. It can be shown, however, that if an appropriate set of evaluation data is available, an objective function and appropriate constraints can be formulated. From these equations, the response problem can be cast in terms of game theory of decision analysis and an optimal solution can be obtained using common scarce-resource allocation methods. The optimal solution obtained by this procedure maximises the expected return over all possible implementations of a given set of response options. While considering the development of an optimal spill response, it is useful to consider whether (in the absence of complete data) implementing some subset of these methods is possible to provide relevant and useful information for the spill planning process, even though it may fall short of a statistically optimal solution. In this work we introduce a trajectory analysis planning (TAP) methodology that can provide a cohesive framework for integrating physical transport processes, environmental sensitivity of regional sites, and potential response options. This trajectory analysis planning methodology can be shown to implement a significant part of the game theory analysis and provide 'minimum regret' strategy advice, without actually carrying out the optimisation procedures. (Author)

  2. Development of emergency response plans for community water ...

    African Journals Online (AJOL)

    All water services systems, irrespective of size, location etc., should have emergency response plans (ERPs) to guide officials, stakeholders and consumers through emergencies, as part of managing risks in the water supply system. Emergencies in the water supply system may result from, among other causes, natural ...

  3. Technology disaster response and recovery planning a LITA guide

    CERN Document Server

    Mallery, Mary

    2015-01-01

    Featuring contributions from librarians who offer hard-won advice gained from personal experience, this compendium leads readers through a step-by-step process of creating a library technology disaster response and recovery plan.

  4. Computer Security Incident Response Planning at Nuclear Facilities

    International Nuclear Information System (INIS)

    2016-06-01

    The purpose of this publication is to assist Member States in developing comprehensive contingency plans for computer security incidents with the potential to impact nuclear security and/or nuclear safety. It provides an outline and recommendations for establishing a computer security incident response capability as part of a computer security programme, and considers the roles and responsibilities of the system owner, operator, competent authority, and national technical authority in responding to a computer security incident with possible nuclear security repercussions

  5. Impact of the Provider and Healthcare team Adherence to Treatment Guidelines (PHAT-G) intervention on adherence to national obesity clinical practice guidelines in a primary care centre.

    Science.gov (United States)

    Barnes, Emily R; Theeke, Laurie A; Mallow, Jennifer

    2015-04-01

    Obesity is significantly underdiagnosed and undertreated in primary care settings. The purpose of this clinical practice change project was to increase provider adherence to national clinical practice guidelines for the diagnosis and treatment of obesity in adults. Based upon the National Institutes of Health guidelines for the diagnosis and treatment of obesity, a clinical change project was implemented. Guided by the theory of planned behaviour, the Provider and Healthcare team Adherence to Treatment Guidelines (PHAT-G) intervention includes education sessions, additional provider resources for patient education, a provider reminder system and provider feedback. Primary care providers did not significantly increase on documentation of diagnosis and planned management of obesity for patients with body mass index (BMI) greater than or equal to 30. Medical assistants increased recording of height, weight and BMI in the patient record by 13%, which was significant. Documentation of accurate BMI should lead to diagnosis of appropriate weight category and subsequent care planning. Future studies will examine barriers to adherence to clinical practice guidelines for obesity. Interventions are needed that include inter-professional team members and may be more successful if delivered separately from routine primary care visits. © 2015 John Wiley & Sons, Ltd.

  6. Guideline Knowledge Representation Model (GLIKREM)

    Czech Academy of Sciences Publication Activity Database

    Buchtela, David; Peleška, Jan; Veselý, Arnošt; Zvárová, Jana; Zvolský, Miroslav

    2008-01-01

    Roč. 4, č. 1 (2008), s. 17-23 ISSN 1801-5603 R&D Projects: GA MŠk(CZ) 1M06014 Institutional research plan: CEZ:AV0Z10300504 Keywords : knowledge representation * GLIF model * guidelines Subject RIV: IN - Informatics, Computer Science http://www.ejbi.org/articles/200812/34/1.html

  7. Radon legislation and national guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Aakerblom, G

    1999-07-01

    50-500 Bq/l for public waters and 200-1000 Bq/l for private water supplies. 4 EU member states and 11 non-EU European countries have reference levels for the concentration of radioactive elements in building materials. 8 European countries have guidelines regarding radon at city planning and 13 have mapped the radon risk in their countries. It is essential to the work against radon and to future reduction of radon concentrations in dwellings and workplaces that the national states issue recommendations, regulations, directives or laws on radon limits and building practices. In order to have a significant effect on the radon situation, the questionnaire responses show that radon reference levels and regulations must be enforced or very little progress is achieved. Extensive measurement and research programs have been carried out in many in countries. Heretofore, only those countries with enforced regulations have had successful programs, resulting in remedial actions in more than 10,000 buildings. The only exception is USA, which concentrated on extensive information media campaigns on radon and the training of large numbers of contractors to perform measurements and remedial measures.

  8. Radon legislation and national guidelines

    International Nuclear Information System (INIS)

    Aakerblom, G.

    1999-07-01

    -500 Bq/l for public waters and 200-1000 Bq/l for private water supplies. 4 EU member states and 11 non-EU European countries have reference levels for the concentration of radioactive elements in building materials. 8 European countries have guidelines regarding radon at city planning and 13 have mapped the radon risk in their countries. It is essential to the work against radon and to future reduction of radon concentrations in dwellings and workplaces that the national states issue recommendations, regulations, directives or laws on radon limits and building practices. In order to have a significant effect on the radon situation, the questionnaire responses show that radon reference levels and regulations must be enforced or very little progress is achieved. Extensive measurement and research programs have been carried out in many in countries. Heretofore, only those countries with enforced regulations have had successful programs, resulting in remedial actions in more than 10,000 buildings. The only exception is USA, which concentrated on extensive information media campaigns on radon and the training of large numbers of contractors to perform measurements and remedial measures

  9. Test plan for qualification of the S-type fiberglass materials for use as the liquid observation well casing

    International Nuclear Information System (INIS)

    Parra, S.A.

    1995-01-01

    This test plan presents the guidelines and requirements for acceptance of the S-type fiberglass material for use as the liquid observation well casing material. The plan for evaluating the physical properties of the candidate fiberglass materials when subjected to radiation, corrosive chemicals, and high temperatures typically found in the waste tanks are outlined. The tests also include tube connection evaluations. Finally, the test plan identifies the participants, their responsibilities, and the schedule for completion of the work

  10. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented

  11. Asthma Management in Educational Settings: Implementing Guideline-Based Care in Washington State Schools.

    Science.gov (United States)

    Evans-Agnew, Robin A; Klein, Nicole; Lecce, Sally

    2015-11-01

    Managing asthma in the schools is complex and requires careful planning. This article highlights key steps in implementing guideline-based care for children with asthma in Washington State schools: assessing students, establishing acuity, communicating with parents, and training staff. Advance planning can improve outcomes for students, parents, and school staff in managing this complex and prevalent disease. NASN recently developed asthma management guidelines. Developing state-specific guidelines provides an opportunity to speak specifically to state laws and nurse practice acts while also reinforcing the importance of specialized practice to school nurses, school administrators and teachers, parents, and students. © 2015 The Author(s).

  12. The Plan's the Thing.

    Science.gov (United States)

    Raley, Nancy

    1986-01-01

    Planning is the process of setting direction, priorities, and guidelines. A CASE survey of public relations professionals is described that notes the use of staff retreats and brainstorming sessions, among other techniques and strategies, that help professionals plan. (MLW)

  13. Intention to use sport concussion guidelines among community-level coaches and sports trainers.

    Science.gov (United States)

    Newton, Joshua D; White, Peta E; Ewing, Michael T; Makdissi, Michael; Davis, Gavin A; Donaldson, Alex; Sullivan, S John; Seward, Hugh; Finch, Caroline F

    2014-09-01

    Sporting bodies have developed guidelines for managing community-level players with suspected concussion in response to international consensus statements on concussion in sport. The purpose of this study was to examine the factors that influence the intended use of concussion guidelines among community-level coaches and sports trainers from two popular football codes in Australia: Australian football and rugby league. Cross-sectional survey. The survey, based on an extended theory of planned behaviour model, was completed by 183 Australian football coaches, 121 Australian football sports trainers, 171 rugby league coaches, and 142 rugby league sports trainers. Personal norms and self-efficacy were significant predictors of intention to use concussion guidelines, although the relationship between self-efficacy and intention was stronger among Australian football coaches than rugby league coaches. Analysis of the salient beliefs that underpin self-efficacy found that coaches, irrespective of football code, felt less familiar (χ(2)=25.70, psports trainers in using the concussion guidelines. At the same time, Australian football personnel, irrespective of their team role, felt that they had insufficient time (χ(2)=8.04, psport concussion guidelines should focus on enhancing self-efficacy and leveraging personal norms. Increasing coaches' familiarity and experience in using the concussion guidelines would also be warranted, as would finding ways to overcome the perceived time and resource constraints identified among Australian football personnel. Copyright © 2013 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.

  14. Regulations and guidelines from the manufacturers' point of view

    International Nuclear Information System (INIS)

    Orth, K.H.

    1977-01-01

    Work on regulations and guidelines is a prerequisite for a better utilization of capacities, for improvements with regard to the licensing procedure and for a more efficient use of the available potential of engineers at the manufacturers' side who, freed from routine tasks, might be charged with further improving the safety of plants. Regulations and guidelines enable a shortening of the planning and building time, an employment of well-tried techniques and directions, multiple use of manufacturing documents, a reduction of the risks to be met in the planning, construction and start-up phases. They enable mass-production of components to be finished at a fixed date, a standardized operation manual and standardized staff training. Cooperation of nuclear power plant manufacturers in drawing up regulations and guidelines is thus not only an issue for the present, but also an investment for the future. (orig./HP) [de

  15. Environmental emergency response plans (EERPs): A single plan approach to satisfy multiple regulations

    International Nuclear Information System (INIS)

    Muzyka, L.

    1995-01-01

    Conrail is a freight railroad operating in twelve northeast and midwestern states transporting goods and materials over 11,700 miles of railroad. To repair, maintain, rebuild, and manufacture locomotives and rail cars, and to maintain the track, right of way, bridges, tunnels and other structures, Conrail uses petroleum products, solvents and cleaners. These products are stored in hundreds of storage tanks in and around the yards and right of way. To power the trains, locomotives are fueled with diesel fuel. With large volumes of fuel, lubricants, solvents and cleaners, safe and efficient handling of petroleum and chemicals is crucial to avoid negative impacts on the environment. Conrail recently revisited the issue of environmental emergency response planning. In an attempt to assure full compliance with a myriad of federal, state, and local regulation, a ''single plan approach'' was chosen. Single plans for each facility, coined EERPs, were decided on after careful review of the regulations, and evaluation of the company's operational and organizational needs

  16. Survey of Canadian hospitals radiation emergency plans

    Energy Technology Data Exchange (ETDEWEB)

    Davis, C [Social Data Research Ltd./The Flett Consulting Group, Inc., Ottawa, ON (Canada)

    1996-02-01

    This report documents the findings of a survey of Canadian hospitals conducted by Social Data Research Ltd. during the Spring and Summer, 1995. The main objective of the survey was to determine the state of readiness of Canadian hospitals in respect of radiation emergency planning. In addition, the AECB was interested in knowing the extent to which a report by the Group of Medical Advisors, `GMA-3: Guidelines on Hospital Emergency Plans for the Management of Minor Radiation Accidents`, which was sponsored and distributed in 1993, was received and was useful to hospital administrators and emergency personnel. A self-administered questionnaire was distributed to 598 acute care hospitals, and 274 responses were received. The main conclusion of this study is that, with the exception of a few large institutions, hospitals generally do not have specific action plans to handle minor radiation accidents. (author).

  17. Survey of Canadian hospitals radiation emergency plans

    International Nuclear Information System (INIS)

    Davis, C.

    1996-02-01

    This report documents the findings of a survey of Canadian hospitals conducted by Social Data Research Ltd. during the Spring and Summer, 1995. The main objective of the survey was to determine the state of readiness of Canadian hospitals in respect of radiation emergency planning. In addition, the AECB was interested in knowing the extent to which a report by the Group of Medical Advisors, 'GMA-3: Guidelines on Hospital Emergency Plans for the Management of Minor Radiation Accidents', which was sponsored and distributed in 1993, was received and was useful to hospital administrators and emergency personnel. A self-administered questionnaire was distributed to 598 acute care hospitals, and 274 responses were received. The main conclusion of this study is that, with the exception of a few large institutions, hospitals generally do not have specific action plans to handle minor radiation accidents. (author)

  18. ECOWindS Joint Action Plan - Guidelines for Implementation

    DEFF Research Database (Denmark)

    2015-01-01

    The Joint Action Plan (JAP) is a deliverable of the European Clusters for Offshore Wind Servicing (ECOWindS) project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry. Th...

  19. Process for planning and control of software projects using XedroGESPRO

    OpenAIRE

    Jacqueline Marín-Sánchez; José Alejandro Lugo-García; Pedro Yobanis Piñero-Pérez; Alena María Santiesteban-García; Félix Noel Abelardo-Santana; Javier Menéndez-Rizo

    2014-01-01

    The software project management in Cuba has become a key area for improving production processes and decisionmaking in organizations. Several models and standards for process improvement, related with project management, proposed best practices on issues of planning and control of projects. However, they are generic guidelines that describe only those activities to execute, leaving the responsibility for implementing to organizations, using sometimes , expensive proprietary infor...

  20. NDMA guidelines on management of nuclear and radiological emergencies

    International Nuclear Information System (INIS)

    Abani, M.C.

    2011-01-01

    The National Disaster Management Authority (NDMA), ever since it's formation as an apex policy making body for the country in the field of disaster management, has formulated a set of guidelines to assist the various ministries, states and stakeholders in preparing their plans to handle different types of disasters. The guidelines on management of nuclear and radiological emergencies assume great importance in the present context, as our country has very ambitious programme to exploit nuclear energy for peaceful uses. Though, we have an enviable and impeccable record of safety and virtually fail-safe operations in all our nuclear establishments, the possibility, however, remote it may be, of human error, systems failure, sabotage, earthquake, floods, terrorist attacks etc leading to the release of radioactive material in the public domain, cannot be entirely ruled out. With this view, it was decided to prepare the national guidelines by NDMA to manage any nuclear/radiological emergency in public domain. Through these guidelines, we aim to further strengthen our existing nuclear/radiological emergency management framework and generate public awareness, which will go a long way in allaying misapprehensions, if any, amongst the public about the country's nuclear programme. Like in all our guidelines for handling of different types of the disasters, in these Guidelines also, maximum emphasis has been laid on the prevention of nuclear and radiological emergencies, along with a detailed consideration of all other elements of the disaster management continuum. The national guidelines have been prepared and a consensus was arrived on various issues, after widespread consultations and elaborates discussions amongst experts as well as stakeholders. It is assumed that once these guidelines are implemented by the stakeholders and converted into action plans followed by SOPs that will further reduce the chances of accidents in the nuclear arena. (author)

  1. UMTRA Project: Environment, Safety, and Health Plan

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations

  2. Strategy and Management Guideline on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    An action-oriented and practical guideline for the planning, organisation and management of preventive school maintenance in Eritrea. The manual is the result of a participatory planning process which has involved actors at the school and community level, district levels and the national policy...

  3. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    International Nuclear Information System (INIS)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site

  4. Guidelines for the undergraduate psychology major: Version 2.0.

    Science.gov (United States)

    2016-01-01

    The APA Guidelines for the Undergraduate Psychology Major: Version 2.0 (henceforth Guidelines 2.0; APA, 2013) represents a national effort to describe and develop high-quality undergraduate programs in psychology. The task force charged with the revision of the original guidelines for the undergraduate major examined the success of the document's implementation and made changes to reflect emerging best practices and to integrate psychology's work with benchmarking scholarship in higher education. Guidelines 2.0 abandoned the original distinction drawn between psychology-focused skills and psychology skills that enhance liberal arts development. Instead, Guidelines 2.0 describes five inclusive goals for the undergraduate psychology major and two developmental levels of student learning outcomes. Suggestions for assessment planning are provided for each of the five learning goals. (c) 2016 APA, all rights reserved).

  5. Choosing the Right Words: The Development of Guidelines for the Selection of the "Appropriate" Crisis-Response Strategies.

    Science.gov (United States)

    Coombs, W. Timothy

    1995-01-01

    States that although crisis management has evolved rapidly in the past decade, the symbolic aspect of crisis management has been ignored. Indicates little research has been done to examine the effects of crisis-response strategies to see how they shape public opinion. Presents a list of guidelines for appropriate use of a given strategy (based on…

  6. UK national guidelines on the management of syphilis 2015.

    Science.gov (United States)

    Kingston, M; French, P; Higgins, S; McQuillan, O; Sukthankar, A; Stott, C; McBrien, B; Tipple, C; Turner, A; Sullivan, A K; Radcliffe, Keith; Cousins, Darren; FitzGerald, Mark; Fisher, Martin; Grover, Deepa; Higgins, Stephen; Kingston, Margaret; Rayment, Michael; Sullivan, Ann

    2016-05-01

    These guidelines are an update for 2015 of the 2008 UK guidelines for the management of syphilis. The writing group have piloted the new BASHH guideline methodology, notably using the GRADE system for assessing evidence and making recommendations. We have made significant changes to the recommendations for screening infants born to mothers with positive syphilis serology and to facilitate accurate and timely communication between the teams caring for mother and baby we have developed a birth plan. Procaine penicillin is now an alternative, not preferred treatment, for all stages of syphilis except neurosyphilis, but the length of treatment for this is shortened. Other changes are summarised at the start of the guideline. © The Author(s) 2016.

  7. Planning and implementing nuclear emergency response facilities

    International Nuclear Information System (INIS)

    Williams, D.H.

    1983-01-01

    After Three Mile Island, Arkansas Nuclear One produced a planning document called TMI-2 Response Program. Phase I of the program defined action plans in nine areas: safety assessment, training, organization, public information, communication, security, fiscal-governmental, technical and logistical support. Under safety assessment, the staff was made even better prepared to handle radioactive material. Under training, on site simulators for each unit at ANO were installed. The other seven topics interface closely with each other. An emergency control center is diagrammed. A habitable technical support system was created. A media center, with a large media area, and an auditorium, was built. Electric door strike systems increased security. Phone networks independently run via microwave were installed. Until Three Mile Island, logistical problems were guesswork. That incident afforded an opportunity to better identify and prepare for these problems

  8. New Structure of Emergency Response Plan in Croatia

    International Nuclear Information System (INIS)

    Valcic, I.; Subasic, D.; Cavlina, N.

    1998-01-01

    The new structure of a national emergency response plan in the case of nuclear accident is based on general requirements of modernization according to international recommendations, with a new Technical Support Center as a so-called lead technical agency, with the plan adapted to the organization of the Civil Protection, with all necessary elements of preparedness for the event of a nuclear accident in Krsko NPP and Paks NPP and with such a plan of procedures that will, to greatest possible extent, be compatible with the existing plan in neighboring countries Slovenia and Hungary. The main requirement that direct s a new organization scheme for taking protective actions in the event of a nuclear accident, is the requirement of introducing a Technical Support Center. The basic role of TSC is collecting data and information on nuclear accident, analyzing and estimating development of an accident, and preparing proposals for taking protective actions and for informing the public. TSC is required to forward those proposals to the Civil Protection, which on the basis of evaluation of proposals makes decisions on implementation and surveillance of implementation of protective measures. (author)

  9. Guidelines for Reporting Medical Research

    DEFF Research Database (Denmark)

    Johansen, Mathilde; Thomsen, Simon Francis

    2016-01-01

    As a response to a low quality of reporting of medical research, guidelines for several different types of study design have been developed to secure accurate reporting and transparency for reviewers and readers from the scientific community. Herein, we review and discuss the six most widely...... accepted and used guidelines: PRISMA, CONSORT, STROBE, MOOSE, STARD, and SPIRIT. It is concluded that the implementation of these guidelines has led to only a moderate improvement in the quality of the reporting of medical research. There is still much work to be done to achieve accurate and transparent...... reporting of medical research findings....

  10. The BUMP model of response planning: intermittent predictive control accounts for 10 Hz physiological tremor.

    Science.gov (United States)

    Bye, Robin T; Neilson, Peter D

    2010-10-01

    Physiological tremor during movement is characterized by ∼10 Hz oscillation observed both in the electromyogram activity and in the velocity profile. We propose that this particular rhythm occurs as the direct consequence of a movement response planning system that acts as an intermittent predictive controller operating at discrete intervals of ∼100 ms. The BUMP model of response planning describes such a system. It forms the kernel of Adaptive Model Theory which defines, in computational terms, a basic unit of motor production or BUMP. Each BUMP consists of three processes: (1) analyzing sensory information, (2) planning a desired optimal response, and (3) execution of that response. These processes operate in parallel across successive sequential BUMPs. The response planning process requires a discrete-time interval in which to generate a minimum acceleration trajectory to connect the actual response with the predicted future state of the target and compensate for executional error. We have shown previously that a response planning time of 100 ms accounts for the intermittency observed experimentally in visual tracking studies and for the psychological refractory period observed in double stimulation reaction time studies. We have also shown that simulations of aimed movement, using this same planning interval, reproduce experimentally observed speed-accuracy tradeoffs and movement velocity profiles. Here we show, by means of a simulation study of constant velocity tracking movements, that employing a 100 ms planning interval closely reproduces the measurement discontinuities and power spectra of electromyograms, joint-angles, and angular velocities of physiological tremor reported experimentally. We conclude that intermittent predictive control through sequential operation of BUMPs is a fundamental mechanism of 10 Hz physiological tremor in movement. Copyright © 2010 Elsevier B.V. All rights reserved.

  11. Translating international HIV treatment guidelines into local priorities in Indonesia.

    Science.gov (United States)

    Tromp, Noor; Prawiranegara, Rozar; Siregar, Adiatma; Wisaksana, Rudi; Pinxten, Lucas; Pinxten, Juul; Lesmana Putra, Arry; Kurnia Sunjaya, Deni; Jansen, Maarten; Hontelez, Jan; Maurits, Scott; Maharani, Febrina; Bijlmakers, Leon; Baltussen, Rob

    2018-03-01

    International guidelines recommend countries to expand antiretroviral therapy (ART) to all HIV-infected individuals and establish local-level priorities in relation to other treatment, prevention and mitigation interventions through fair processes. However, no practical guidance is provided for such priority-setting processes. Evidence-informed deliberative processes (EDPs) fill this gap and combine stakeholder deliberation to incorporate relevant social values with rational decision-making informed by evidence on these values. This study reports on the first-time implementation and evaluation of an EDP in HIV control, organised to support the AIDS Commission in West Java province, Indonesia, in the development of its strategic plan for 2014-2018. Under the responsibility of the provincial AIDS Commission, an EDP was implemented to select priority interventions using six steps: (i) situational analysis; (ii) formation of a multistakeholder Consultation Panel; (iii) selection of criteria; (iv) identification and assessment of interventions' performance; (v) deliberation; and (vi) selection of funding and implementing institutions. An independent researcher conducted in-depth interviews (n = 21) with panel members to evaluate the process. The Consultation Panel included 23 stakeholders. They identified 50 interventions and these were evaluated against four criteria: impact on the epidemic, stigma reduction, cost-effectiveness and universal coverage. After a deliberative discussion, the Consultation Panel prioritised a combination of several treatment, prevention and mitigation interventions. The EDP improved both stakeholder involvement and the evidence base for the strategic planning process. EDPs fill an important gap which international guidelines and current tools for strategic planning in HIV control leave unaddressed. © 2018 The Authors. Tropical Medicine & International Health Published by John Wiley & Sons Ltd.

  12. When implementation fails: the case of a nursing guideline for fall prevention

    NARCIS (Netherlands)

    van der Helm, Jelle; Goossens, Astrid; Bossuyt, Patrick

    2006-01-01

    BACKGROUND: Implementing guidelines can be very difficult. No magic bullet or step-by-step implementation plan is available, neither is any single implementation strategy superior. At the Academic Medical Center (AMC) in Amsterdam, a nursing guideline was developed in 1993 on prevention of patient

  13. Guidelines for sustainable tourism planning in the township of San Francisco de Asis (Acandi Municipality, Choco, Colombia)

    International Nuclear Information System (INIS)

    Roldan Carvajal, Carlos Daniel

    2012-01-01

    This paper presents important management guidelines for conducting a tourism planning process in the township of San Francisco de Asis, which were developed from the conceptual notion of sustainable tourism and participation of local people. This case considered the participatory research method, used ethnography techniques and implemented shops with the community. As a main result proposed the consolidation of four components, socio- political, socio- cultural, social- ecological and socio- economic; that must be managed in an integrated fashion to achieve real sustainable tourism in this territory. In the first component outlines an participatory process that must take place between the various stake holders; in the second considered strengthen the social tissue and valuing cultural traditions to adequately integrate tourism activities; the third proposes an integrated environmental conservation in the whole territory and as an obligation of all stake holders, including to tourists; finally, in the fourth component, recommend the creation of more opportunities and general welfare for the entire local population in order to prevent the growth of tourism segregated. As a general conclusion will projected that the implementation of these guidelines permitted advance, from the practical, in the development of a truly sustainable tourism that help improve the living conditions of local people and conserve valuable natural and cultural resources that exist in this territory.

  14. Human engineering guidelines for the evaluation and assessment of Video Display Units

    International Nuclear Information System (INIS)

    Gilmore, W.E.

    1985-07-01

    This report provides the Nuclear Regulatory Commission with a single source that documents known guidelines for conducting formal Human Factors evaluations of Video Display Units (VDUs). The handbook is a ''cookbook'' of acceptance guidelines for the reviewer faced with the task of evaluating VDUs already designed or planned for service in the control room. The areas addressed are video displays, controls, control/display integration, and workplace layout. Guidelines relevant to each of those areas are presented. The existence of supporting research is also indicated for each guideline. A Comment section and Method for Assessment section are provided for each set of guidelines

  15. Using gEUD based plan analysis method to evaluate proton vs. photon plans for lung cancer radiation therapy.

    Science.gov (United States)

    Xiao, Zhiyan; Zou, Wei J; Chen, Ting; Yue, Ning J; Jabbour, Salma K; Parikh, Rahul; Zhang, Miao

    2018-03-01

    The goal of this study was to exam the efficacy of current DVH based clinical guidelines draw from photon experience for lung cancer radiation therapy on proton therapy. Comparison proton plans and IMRT plans were generated for 10 lung patients treated in our proton facility. A gEUD based plan evaluation method was developed for plan evaluation. This evaluation method used normal lung gEUD(a) curve in which the model parameter "a" was sampled from the literature reported value. For all patients, the proton plans delivered lower normal lung V 5 Gy with similar V 20 Gy and similar target coverage. Based on current clinical guidelines, proton plans were ranked superior to IMRT plans for all 10 patients. However, the proton and IMRT normal lung gEUD(a) curves crossed for 8 patients within the tested range of "a", which means there was a possibility that proton plan would be worse than IMRT plan for lung sparing. A concept of deficiency index (DI) was introduced to quantify the probability of proton plans doing worse than IMRT plans. By applying threshold on DI, four patients' proton plan was ranked inferior to the IMRT plan. Meanwhile if a threshold to the location of curve crossing was applied, 6 patients' proton plan was ranked inferior to the IMRT plan. The contradictory ranking results between the current clinical guidelines and the gEUD(a) curve analysis demonstrated there is potential pitfalls by applying photon experience directly to the proton world. A comprehensive plan evaluation based on radio-biological models should be carried out to decide if a lung patient would really be benefit from proton therapy. © 2018 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.

  16. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  17. 49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans

    Science.gov (United States)

    2010-10-01

    ... potentially affected public drinking water intake, lake, river, and stream within a radius of 5 miles (8... Appendix A to Part 194 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY RESPONSE...

  18. Guidelines for equipment and staffing of radiotherapy facilities in the European countries: Final results of the ESTRO-HERO survey

    International Nuclear Information System (INIS)

    Dunscombe, Peter; Grau, Cai; Defourny, Noémie; Malicki, Julian; Borras, Josep M.; Coffey, Mary; Bogusz, Marta; Gasparotto, Chiara; Slotman, Ben; Lievens, Yolande; Kokobobo, Arianit; Sedlmayer, Felix; Slobina, Elena; De Hertogh, Olivier; Hadjieva, Tatiana; Petera, Jiri; Eriksen, Jesper Grau; Jaal, Jana; Bly, Ritva; Azria, David

    2014-01-01

    Background and purpose: In planning to meet evidence based needs for radiotherapy, guidelines for the provision of capital and human resources are central if access, quality and safety are not to be compromised. A component of the ESTRO-HERO (Health Economics in Radiation Oncology) project is to document the current availability and content of guidelines for radiotherapy in Europe. Materials and methods: An 84 part questionnaire was distributed to the European countries through their national scientific and professional radiotherapy societies with 30 items relating to the availability of guidelines for equipment and staffing and selected operational issues. Twenty-nine countries provided full or partial evaluable responses. Results: The availability of guidelines across Europe is far from uniform. The metrics used for capital and human resources are variable. There seem to have been no major changes in the availability or specifics of guidelines over the ten-year period since the QUARTS study with the exception of the recent expansion of RTT staffing models. Where comparison is possible it appears that staffing for radiation oncologists, medical physicists and particularly RTTs tend to exceed guidelines suggesting developments in clinical radiotherapy are moving faster than guideline updating. Conclusion: The efficient provision of safe, high quality radiotherapy services would benefit from the availability of well-structured guidelines for capital and human resources, based on agreed upon metrics, which could be linked to detailed estimates of need

  19. Development of new canine and feline preventive healthcare guidelines designed to improve pet health.

    Science.gov (United States)

    2011-01-01

    The American Veterinary Medical Association (AVMA) and American Animal Hospital Association (AAHA) have jointly introduced the first Canine and Feline Preventive Healthcare Guidelines. These consensus statements provide veterinarians with a new resource for improving patient care by emphasizing the value and scope of regular pet examinations. The two guidelines provide complete recommendations for comprehensive preventive healthcare programs, published as accessible, single-page documents. The guidelines are based on the subjective-objective-assessment-plan (SOAP) methodology of case management, a proven approach traditionally used with sick or injured patients. This logical and disciplined process is equally applicable to healthy patients and is designed to consistently deliver optimal patient care. The guidelines recommend visits for health examinations on at least an annual basis, recognizing that for many pets, more frequent visits may be appropriate, depending on the individual needs of the patient. The guidelines also provide detailed diagnostic, therapeutic, prevention, and follow up plans, to be accompanied by appropriate documentation. The inclusive content and concise format of the guidelines are designed to maximize their practical value and make them easy to implement.

  20. Advanced human-system interface design review guidelines

    International Nuclear Information System (INIS)

    O'Hara, J.M.

    1990-01-01

    Advanced, computer-based, human-system interface designs are emerging in nuclear power plant (NPP) control rooms. These developments may have significant implications for plant safety in that they will greatly affect the ways in which operators interact with systems. At present, however, the only guidance available to the US Nuclear Regulatory Commission (NRC) for the review of control room-operator interfaces, NUREG-0700, was written prior to these technological changes and is thus not designed to address them. The objective of the project reported in this paper is to develop an Advanced Control Room Design Review Guideline for use in performing human factors reviews of advanced operator interfaces. This guideline will be implemented, in part, as a portable, computer-based, interactive document for field use. The paper describes the overall guideline development methodology, the present status of the document, and the plans for further guideline testing and development. 21 refs., 3 figs

  1. Cities and mobility: a planning guideline for community-compatible mobility; Stadtwege: Planungsleitfaden fuer Stadtvertraegliche Mobilitaet in Kommunen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    So far, municipal transport planning and policy have not really resulted in pioneering concepts for solving problems arising from the transport issue common to all cities. Even individual promising approaches, which mostly relate to singular aspects of municipal transport policy, cannot obscure the fact that the routines of transport planning obviate innovative impulses. Even the research project's two exemplary municipalities, Freiburg and Schwerin, are a long way from having attained a mobility beneficial to the community (as reflected in a report on these cities' transport situation in the annex). In both there are elements of motor-vehicle-oriented planning and transport policy, but also, in part, distinct clues to a decline in car orientation and to the furtherance of alternative, environmentally compatible means of transport. The present guideline wants to open up new perspectives and give concerned planners impulses. It summarizes results from the research project 'Compatibility of urban mobility' and describes new ideas and paradigms in municipal transport planning and policy. (orig.) [German] Kommunale Verkehrsplanung und -politik hat bisher nicht zu wirklich zukunftsweisenden Loesungsentwuerfen der flaechendeckend festzustellenden Verkehrsproblematik in den Staedten gefuehrt. Auch einzelne gute Ansaetze, die meist auf singulaere Aspekte der staedtischen Verkehrspolitik bezogen sind, koennen nicht darueber hinwegtaeuschen, dass die Routinen der Verkehrsplanung den Blick auf innovative Impulse verstellen. Auch die beiden Modellkommunen des Forschungsprojektes, Freiburg und Schwerin, sind um einiges von dem Ziel der Stadtvertraeglichen Mobilitaet entfernt (s. verkehrliche Zustandsbeschreibung im Anhang). In beiden Staedten finden sich Elemente der autoorientierten Planung und Verkehrspolitik, aber auch zum Teil deutliche Hinweise des Zurueckdraengens der Autoorientierung und der Foerderung der umweltvertraeglichen

  2. [Ethical principles of management and planning during influenza pandemic].

    Science.gov (United States)

    Kubar', O I; Asatrian, A Zh

    2012-01-01

    The article is dedicated to an actual problem of ethical component inclusion into the system of management and planning of epidemic control measures during threat emergence and in the course of influenza pandemic (epidemic) progress. Data regarding development of international ethical guidelines during influenza including WHO recommendations are presented and analysis of normative documents in Russian Federation is given. A necessity of comprehension and accounting of ethical values in pandemic preparedness is shown, main directions of action and responsibility are revealed. Key ethical positions of planning and implementation of measures during influenza pandemic are outlined, compliance with those determines the level of public support and thus provides the effectiveness of the implemented measures.

  3. Nuclear accident/radiological emergency assistance plan. NAREAP - edition 2000. Emergency preparedness and response

    International Nuclear Information System (INIS)

    2000-01-01

    The purpose of the Nuclear Accident/Radiological Emergency Assistance Plan (NAREAP) is to describe the framework for systematic, integrated, co-ordinated, and effective preparedness and response for a nuclear accident or radiological emergency involving facilities or practices that may give rise to a threat to health, the environment or property. The purpose of the NAREAP is: to define the emergency response objectives of the Agency's staff in a nuclear accident or a radiological emergency; to assign responsibilities for performing the tasks and authorities for making the decisions that comprise the Agency staff's response to a nuclear accident or radiological emergency; to guide the Agency managers who must ensure that all necessary tasks are given the necessary support in discharging the Agency staff responsibilities and fulfilling its obligations in response to an emergency; to ensure that the development and maintenance of detailed and coherent response procedures are well founded; to act as a point of reference for individual Agency staff members on their responsibilities (as an individual or a team member) throughout a response; to identify interrelationships with other international intergovernmental Organizations; and to serve as a training aid to maintain readiness of personnel. The NAREAP refers to the arrangements of the International Atomic Energy Agency and of the United Nations Security and Safety Section at the Vienna International Centre (UNSSS-VIC) that may be necessary for the IAEA to respond to a nuclear accident or radiological emergency, as defined in the Early Notification and Assistance Conventions. It covers response arrangements for any situation that may have actual, potential or perceived radiological consequences and that could require a response from the IAEA, as well as the arrangements for developing, maintaining and exercising preparedness. The implementing procedures themselves are not included in the NAREAP, but they are required

  4. 47 CFR 90.1211 - Regional plan.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Regional plan. 90.1211 Section 90.1211... § 90.1211 Regional plan. (a) To facilitate the shared use of the 4.9 GHz band, each region may submit a plan on guidelines to be used for sharing the spectrum within the region. Any such plan must be...

  5. Evidence-based guidelines for the wise use of computers by children: physical development guidelines.

    Science.gov (United States)

    Straker, L; Maslen, B; Burgess-Limerick, R; Johnson, P; Dennerlein, J

    2010-04-01

    Computer use by children is common and there is concern over the potential impact of this exposure on child physical development. Recently principles for child-specific evidence-based guidelines for wise use of computers have been published and these included one concerning the facilitation of appropriate physical development. This paper reviews the evidence and presents detailed guidelines for this principle. The guidelines include encouraging a mix of sedentary and whole body movement tasks, encouraging reasonable postures during computing tasks through workstation, chair, desk, display and input device selection and adjustment and special issues regarding notebook computer use and carriage, computing skills and responding to discomfort. The evidence limitations highlight opportunities for future research. The guidelines themselves can inform parents and teachers, equipment designers and suppliers and form the basis of content for teaching children the wise use of computers. STATEMENT OF RELEVANCE: Many children use computers and computer-use habits formed in childhood may track into adulthood. Therefore child-computer interaction needs to be carefully managed. These guidelines inform those responsible for children to assist in the wise use of computers.

  6. A survey of psychiatrists' attitudes toward treatment guidelines.

    Science.gov (United States)

    Healy, Daniel J; Goldman, Mona; Florence, Timothy; Milner, Karen K

    2004-04-01

    We developed a survey to look at psychiatrists' attitudes toward psychotropic prescribing guidelines, specifically the Texas Medication Algorithm Project (TMAP) algorithms. The 22-page survey was distributed to 24 psychiatrists working in 4 CMHC's; 13 completed the survey. 90% agreed that guidelines should be general and flexible. The majority also agreed that guidelines should define how to measure response to a specific agent; fewer agreed guidelines should specify dosage, side effect management, or augmentation strategies. Psychiatrists were familiar with TMAP; none referred to it in their practice. In spite of this, psychiatrists' medication preferences were similar to those suggested by guidelines.

  7. Formalized Combined 2003 European Guidelines on Cardiovascular Disease Prevention and Hypertension

    Czech Academy of Sciences Publication Activity Database

    Peleška, Jan; Anger, Z.; Buchtela, David; Tomečková, Marie; Veselý, Arnošt; Zvárová, Jana

    23 Suppl. 2, - (2005), s. 196 ISSN 0263-6352. [European Meeting on Hypertension /15./. 17.06.2005-21.06.2005, Milan] R&D Projects: GA AV ČR 1ET200300413 Institutional research plan: CEZ:AV0Z10300504 Keywords : European medical guidelines * formalization of combined guidelines Subject RIV: FA - Cardiovascular Disease s incl. Cardiotharic Surgery

  8. A Typology for Modeling Processes in Clinical Guidelines and Protocols

    Science.gov (United States)

    Tu, Samson W.; Musen, Mark A.

    We analyzed the graphical representations that are used by various guideline-modeling methods to express process information embodied in clinical guidelines and protocols. From this analysis, we distilled four modeling formalisms and the processes they typically model: (1) flowcharts for capturing problem-solving processes, (2) disease-state maps that link decision points in managing patient problems over time, (3) plans that specify sequences of activities that contribute toward a goal, (4) workflow specifications that model care processes in an organization. We characterized the four approaches and showed that each captures some aspect of what a guideline may specify. We believe that a general guideline-modeling system must provide explicit representation for each type of process.

  9. Public safety around dams guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, T [Canadian Dam Association, Edmonton, AB (Canada)

    2010-07-01

    This presentation discussed Canadian and international initiatives for improving dam safety and described some of the drivers for the development of new Canadian Dam Association (CDA) public safety guidelines for dams. The CDA guidelines were divided into the following 3 principal sections: (1) managed system elements, (2) risk assessment and management, and (3) technical bulletins. Public and media responses to the drownings have called for improved safety guidelines. While the public remains unaware of the hazards of dams, public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. Guidelines are needed for dam owners in order to provide due diligence. Various organizations in Canada are preparing technical and public safety dam guidelines. CDA guidelines have also been prepared for signage, booms and buoys, and audible and visual alerts bulletins. Working groups are also discussing recommended practices for spill procedures, spillways and the role of professional engineers in ensuring public safety. Methods of assessing risk were also reviewed. Managed system elements for risk assessment and public interactions were also discussed, and stepped control measures were presented. tabs., figs.

  10. Joint Planning Of Energy Storage and Transmission Considering Wind-Storage Combined System and Demand Side Response

    Science.gov (United States)

    Huang, Y.; Liu, B. Z.; Wang, K. Y.; Ai, X.

    2017-12-01

    In response to the new requirements of the operation mode of wind-storage combined system and demand side response for transmission network planning, this paper presents a joint planning of energy storage and transmission considering wind-storage combined system and demand side response. Firstly, the charge-discharge strategy of energy storage system equipped at the outlet of wind farm and demand side response strategy are analysed to achieve the best comprehensive benefits through the coordination of the two. Secondly, in the general transmission network planning model with wind power, both energy storage cost and demand side response cost are added to the objective function. Not only energy storage operation constraints and but also demand side response constraints are introduced into the constraint condition. Based on the classical formulation of TEP, a new formulation is developed considering the simultaneous addition of the charge-discharge strategy of energy storage system equipped at the outlet of the wind farm and demand side response strategy, which belongs to a typical mixed integer linear programming model that can be solved by mature optimization software. The case study based on the Garver-6 bus system shows that the validity of the proposed model is verified by comparison with general transmission network planning model. Furthermore, the results demonstrate that the joint planning model can gain more economic benefits through setting up different cases.

  11. Methods of Medical Guidelines Modelling in GLIF.

    Czech Academy of Sciences Publication Activity Database

    Buchtela, David; Anger, Z.; Peleška, Jan (ed.); Tomečková, Marie; Veselý, Arnošt; Zvárová, Jana

    2005-01-01

    Roč. 11, - (2005), s. 1529-1532 ISSN 1727-1983. [EMBEC'05. European Medical and Biomedical Conference /3./. Prague, 20.11.2005-25.11.2005] Institutional research plan: CEZ:AV0Z10300504 Keywords : medical guidelines * knowledge modelling * GLIF model Subject RIV: BD - Theory of Information

  12. Flight plan: taking responsibility for aviation emissions

    Energy Technology Data Exchange (ETDEWEB)

    Kimber, Hugo

    2007-07-01

    Aviation emissions make up less than 2 per cent of the world total, but are rising fast. These environmental costs must be balanced with development gains, however: air travel can hugely benefit poor countries' economies. The good news is that much can be done to curb emissions while keeping those benefits on board. Workable tools and guidelines for passengers, travel providers, government and airlines are waiting in the wings. A vital area for improvement is the way emissions are reported and calculated. Airlines, travel providers and carbon companies currently report emissions using a hotchpotch of methods, all producing varying results. Basing reports on fuel usage will make standardised ecolabelling possible. With an informed choice, passengers can buy tickets strategically and so encourage airlines to use more efficient technology. Airports can integrate ways of limiting emissions into their daily operations, while governments can invest in better air traffic control. Collective responsibility — and action — could make flying a much more sustainable means of travel.

  13. Organization and planning of conferences

    International Nuclear Information System (INIS)

    Hudson, S.R.

    1976-05-01

    The author uses as an example of conference planning The First International Topical Conference on Electron Beam Research and Technology which was held in Albuquerque, New Mexico, November 3-6, 1975. Guidelines are given through all phases of planning up to and during the meeting

  14. Implementation Plan for a Common Nordic Retail Market. Evaluation of the responses on the public consultation

    Energy Technology Data Exchange (ETDEWEB)

    2010-09-15

    Draft implementation plan for a common Nordic Retail Market was developed in close cooperation with relevant stakeholders in the Nordic electricity market during winter and spring 2010. The implementation plan outlines what should be done, by whom and when in order to create a common Nordic end user market over the coming years. NordREG organised a public consultation on the draft implementation plan from the end of June until the beginning of the August, 2010 and received 25 responses from stakeholders. This evaluation report includes summary of stakeholders' responses and NordREG comments on stakeholders' views. The evaluation of the responses has been taken into account during the finalization of the implementation plan

  15. Compliance with federal and state regulations regarding the emergency response plan and physical security plan at the Oregon State TRIGA reactor

    International Nuclear Information System (INIS)

    Johnson, A.G.; Ringle, J.C.; Anderson, T.V.

    1976-01-01

    Recent legislative actions within the State of Oregon have had a significant impact upon the OSU TRIGA Emergency Response Plan, and to a lesser extent upon the Physical Security Plan. These state imposed changes will be reviewed in light of existing federal requirements. With the upcoming acquisition of FLIP fuel in August 1976, NRC required several major changes to the existing Physical Security Plan. Within the limitations of public disclosure, these changes will be contrasted to the present plan. (author)

  16. A survey on the methodological processes and policies of renal guideline groups as a first step to harmonize renal guidelines

    NARCIS (Netherlands)

    Haller, Maria C.; van der Veer, Sabine N.; Nagler, Evi V.; Tomson, Charlie; Lewington, Andrew; Hemmelgarn, Brenda R.; Gallagher, Martin; Rocco, Michael; Obrador, Gregorio; Vanholder, Raymond; Craig, Jonathan C.; van Biesen, Wim

    2015-01-01

    Worldwide, several bodies produce renal guidelines, potentially leading to duplication of effort while other topics may remain uncovered. A collaborative work plan could improve efficiency and impact, but requires a common approved methodology. The aim of this study was to identify organizational

  17. Planning and Response to the Detonation of an Improvised Nuclear Device: Past, Present, and Future Research

    Energy Technology Data Exchange (ETDEWEB)

    Bentz, A

    2008-07-31

    While the reality of an improvised nuclear device (IND) being detonated in an American city is unlikely, its destructive power is such that the scenario must be planned for. Upon reviewing the academic literature on the effects of and response to IND events, this report looks to actual responders from around the country. The results from the meetings of public officials in the cities show where gaps exist between theoretical knowledge and actual practice. In addition to the literature, the meetings reveal areas where future research needs to be conducted. This paper recommends that local response planners: meet to discuss the challenges of IND events; offer education to officials, the public, and responders on IND events; incorporate 'shelter-first' into response plans; provide information to the public and responders using the 3 Cs; and engage the private sector (including media) in response plans. In addition to these recommendations for the response planners, the paper provides research questions that once answered will improve response plans around the country. By following the recommendations, both groups, response planners and researchers, can help the country better prepare for and mitigate the effects of an IND detonation.

  18. Planning and Response to the Detonation of an Improvised Nuclear Device: Past, Present, and Future Research

    International Nuclear Information System (INIS)

    Bentz, A.

    2008-01-01

    While the reality of an improvised nuclear device (IND) being detonated in an American city is unlikely, its destructive power is such that the scenario must be planned for. Upon reviewing the academic literature on the effects of and response to IND events, this report looks to actual responders from around the country. The results from the meetings of public officials in the cities show where gaps exist between theoretical knowledge and actual practice. In addition to the literature, the meetings reveal areas where future research needs to be conducted. This paper recommends that local response planners: meet to discuss the challenges of IND events; offer education to officials, the public, and responders on IND events; incorporate 'shelter-first' into response plans; provide information to the public and responders using the 3 Cs; and engage the private sector (including media) in response plans. In addition to these recommendations for the response planners, the paper provides research questions that once answered will improve response plans around the country. By following the recommendations, both groups, response planners and researchers, can help the country better prepare for and mitigate the effects of an IND detonation

  19. Addressing the gap between public health emergency planning and incident response

    Science.gov (United States)

    Freedman, Ariela M; Mindlin, Michele; Morley, Christopher; Griffin, Meghan; Wooten, Wilma; Miner, Kathleen

    2013-01-01

    Objectives: Since 9/11, Incident Command System (ICS) and Emergency Operations Center (EOC) are relatively new concepts to public health, which typically operates using less hierarchical and more collaborative approaches to organizing staff. This paper describes the 2009 H1N1 influenza outbreak in San Diego County to explore the use of ICS and EOC in public health emergency response. Methods: This study was conducted using critical case study methodology consisting of document review and 18 key-informant interviews with individuals who played key roles in planning and response. Thematic analysis was used to analyze data. Results: Several broad elements emerged as key to ensuring effective and efficient public health response: 1) developing a plan for emergency response; 2) establishing the framework for an ICS; 3) creating the infrastructure to support response; 4) supporting a workforce trained on emergency response roles, responsibilities, and equipment; and 5) conducting regular preparedness exercises. Conclusions: This research demonstrates the value of investments made and that effective emergency preparedness requires sustained efforts to maintain personnel and material resources. By having the infrastructure and experience based on ICS and EOC, the public health system had the capability to surge-up: to expand its day-to-day operation in a systematic and prolonged manner. None of these critical actions are possible without sustained funding for the public health infrastructure. Ultimately, this case study illustrates the importance of public health as a key leader in emergency response. PMID:28228983

  20. Development of acute exposure guideline levels for airborne exposures to hazardous substances.

    Science.gov (United States)

    Krewski, Daniel; Bakshi, Kulbir; Garrett, Roger; Falke, Ernest; Rusch, George; Gaylor, David

    2004-04-01

    Hazardous substances can be released into the atmosphere due to industrial and transportation accidents, fires, tornadoes, earthquakes, and terrorists, thereby exposing workers and the nearby public to potential adverse health effects. Various enforceable guidelines have been set by regulatory agencies for worker and ambient air quality. However, these exposure levels generally are not applicable to rare lifetime acute exposures, which possibly could occur at high concentrations. Acute exposure guideline levels (AEGLs) provide estimates of concentrations for airborne exposures for an array of short durations that possibly could cause mild (AEGL-1), severe, irreversible, potentially disabling adverse health effects (AEGL-2), or life threatening effects (AEGL-3). These levels can be useful for emergency responders and planners in reducing or eliminating potential risks to the public. Procedures and methodologies for deriving AEGLs are reviewed in this paper that have been developed in the United States, with direct input from international representatives of OECD member-countries, by the National Advisory Committee for Acute Exposure Guidelines for Hazardous Substances and reviewed by the National Research Council. Techniques are discussed for the extrapolation of effects across different exposure durations. AEGLs provide a viable approach for assisting in the prevention, planning, and response to acute airborne exposures to toxic agents.

  1. Reporting of clinical trials: a review of research funders' guidelines

    Directory of Open Access Journals (Sweden)

    Williamson Paula R

    2008-11-01

    Full Text Available Abstract Background Randomised controlled trials (RCTs represent the gold standard methodological design to evaluate the effectiveness of an intervention in humans but they are subject to bias, including study publication bias and outcome reporting bias. National and international organisations and charities give recommendations for good research practice in relation to RCTs but to date no review of these guidelines has been undertaken with respect to reporting bias. Methods National and international organisations and UK based charities listed on the Association for Medical Research Charities website were contacted in 2007; they were considered eligible for this review if they funded RCTs. Guidelines were obtained and assessed in relation to what was written about trial registration, protocol adherence and trial publication. It was also noted whether any monitoring against these guidelines was undertaken. This information was necessary to discover how much guidance researchers are given on the publication of results, in order to prevent study publication bias and outcome reporting bias. Results Seventeen organisations and 56 charities were eligible of 140 surveyed for this review, although there was no response from 12. Trial registration, protocol adherence, trial publication and monitoring against the guidelines were often explicitly discussed or implicitly referred too. However, only eleven of these organisations or charities mentioned the publication of negative as well as positive outcomes and just three of the organisations specifically stated that the statistical analysis plan should be strictly adhered to and all changes should be reported. Conclusion Our review indicates that there is a need to provide more detailed guidance for those conducting and reporting clinical trials to help prevent the selective reporting of results. Statements found in the guidelines generally refer to publication bias rather than outcome reporting bias

  2. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems

  3. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  4. Approach to downstream planning for nearshore response and sensitive areas protection outside Prince William Sound, Alaska

    International Nuclear Information System (INIS)

    DeCola, E.G.; Robertson, T.L.; Robertson, R.; Banta, J.

    2004-01-01

    This study assessed the need for an oil spill response plan for downstream coastal communities that could be affected by oil spilled from tankers travelling in Prince William Sound, Alaska. For the purpose of oil spill contingency planning, the State of Alaska has been divided into the Kodiak and Cook Inlet sub-areas that are at risk for downstream impacts from a Prince William Sound oil spill. The 1989 Exxon Valdez oil spill provided an example of a worst-case scenario oil spill from a tanker in Prince William Sound, but the oil spill planning system that has evolved in Alaska does not adequately plan for on oil spill that originates in one sub-area of the state, but impacts other sub-areas in the downstream spill path. This study analyzed the gaps that exist in the current response planning system in the Prince William Sound, Cook Inlet and Kodiak sub-areas. A method was proposed to improve the existing response plans so that emergency response teams are better prepared to manage cross-boundary oil spills originating in Prince William Sound. The proposed method focuses on nearshore response and sensitive areas protection for coastlines and communities that are at risk for oil spills from a tanker travelling the Trans-Alaska Pipeline System (TAPS). 11 refs., 3 figs

  5. 40 CFR 60.33c - Emission guidelines for municipal solid waste landfill emissions.

    Science.gov (United States)

    2010-07-01

    ... waste landfill emissions. 60.33c Section 60.33c Protection of Environment ENVIRONMENTAL PROTECTION... Guidelines and Compliance Times for Municipal Solid Waste Landfills § 60.33c Emission guidelines for municipal solid waste landfill emissions. (a) For approval, a State plan shall include control of MSW...

  6. ESTRO ACROP guidelines for target volume definition in the treatment of locally advanced non-small cell lung cancer.

    Science.gov (United States)

    Nestle, Ursula; De Ruysscher, Dirk; Ricardi, Umberto; Geets, Xavier; Belderbos, Jose; Pöttgen, Christoph; Dziadiuszko, Rafal; Peeters, Stephanie; Lievens, Yolande; Hurkmans, Coen; Slotman, Ben; Ramella, Sara; Faivre-Finn, Corinne; McDonald, Fiona; Manapov, Farkhad; Putora, Paul Martin; LePéchoux, Cécile; Van Houtte, Paul

    2018-04-01

    Radiotherapy (RT) plays a major role in the curative treatment of locally advanced non-small cell lung cancer (NSCLC). Therefore, the ACROP committee was asked by the ESTRO to provide recommendations on target volume delineation for standard clinical scenarios in definitive (chemo)radiotherapy (RT) and adjuvant RT for locally advanced NSCLC. The guidelines given here are a result of the evaluation of a structured questionnaire followed by a consensus discussion, voting and writing procedure within the committee. Hence, we provide advice for methods and time-points of diagnostics and imaging before the start of treatment planning and for the mandatory and optional imaging to be used for planning itself. Concerning target volumes, recommendations are given for GTV delineation of primary tumour and lymph nodes followed by issues related to the delineation of CTVs for definitive and adjuvant radiotherapy. In the context of PTV delineation, recommendations about the management of geometric uncertainties and target motion are given. We further provide our opinions on normal tissue delineation and organisational and responsibility questions in the process of target volume delineation. This guideline intends to contribute to the standardisation and optimisation of the process of RT treatment planning for clinical practice and prospective studies. Copyright © 2018 Elsevier B.V. All rights reserved.

  7. The UK national response plan: An 'all-risk' approach

    International Nuclear Information System (INIS)

    Englefield, C.

    2001-01-01

    Full text: The UK has been using and regulating radioactive materials for many years. The law, and the regulatory systems to implement it have developed over time, to meet the perceived need. More recently, the threat of inadvertent movements of, and illicit trafficking in radioactive materials has become apparent. This relatively new challenge cannot be met by a single U.K. law enforcement body. There will be Police and security services interest in any cases that arise of deliberate trafficking in fissile materials, and there will be statutory concerns for Customs and Excise. At the operational level, they do not have radioanalytical services and radiation protection support immediately available, as the frequency of occurrence of such incidents is extremely low. However, the typical case is an inadvertent movement. These usually involve orphaned sources, where none of the above law enforcement bodies have a statutory locus. In such cases, it is the UK environment agencies that take the lead (as regulators of radioactive substances), together with Health and Safety Executive as regulators of radiation safety. However they do not have all the statutory powers needed to intervene. This is in contrast to the position in some other countries. The UK paper at the International Conference of Regulators in Buenos Aires in December 2000 described the UK's co-ordination work to create synergies between law enforcement bodies and potentially affected industry groups. This was described as an 'All Risk Approach'. This is seen as the best way to manage an effective response to the challenge, given that the legislation cannot at present provide all the necessary powers. This new paper will describe the UK Response Plan and how it is designed to cover all risk: radiological and socio-economic. It will also describe how the Plan is being tested and validated as a project. The plan draws on UK Emergency Planning policy, as well as IAEA guidance on the Prevention, Detection and

  8. Lupus nephritis management guidelines compared.

    Science.gov (United States)

    Wilhelmus, Suzanne; Bajema, Ingeborg M; Bertsias, George K; Boumpas, Dimitrios T; Gordon, Caroline; Lightstone, Liz; Tesar, Vladimir; Jayne, David R

    2016-06-01

    In the past years, many (randomized) trials have been performed comparing the treatment strategies for lupus nephritis. In 2012, these data were incorporated in six different guidelines for treating lupus nephritis. These guidelines are European, American and internationally based, with one separate guideline for children. They offer information on different aspects of the management of lupus nephritis including induction and maintenance treatment of the different histological classes, adjunctive treatment, monitoring of the patient, definitions of response and relapse, indications for (repeat) renal biopsy, and additional challenges such as the presence of vascular complications, the pregnant SLE patient, treatment in children and adolescents and considerations about end-stage renal disease and transplantation. In this review, we summarize the guidelines, determine the common ground between them, highlight the differences and discuss recent literature. © The Author 2015. Published by Oxford University Press on behalf of ERA-EDTA. All rights reserved.

  9. Restoring stakeholders’ trust in multinationals’ tax planning practices with corporate social responsibility (CSR)

    NARCIS (Netherlands)

    Jallai, Ave-Geidi; Peeters, Bruno; Gribnau, Hans; Badisco, Jo

    2017-01-01

    This contribution discusses the tax planning behaviour of big corporations and investigates Corporate Social Responsibility (CSR) as a tool to battle the issue. It will be argued that certain legal tax planning strategies of multinationals are not acceptable to local communities and the public in

  10. 33 CFR 155.1040 - Response plan requirements for unmanned tank barges carrying oil as a primary cargo.

    Science.gov (United States)

    2010-07-01

    ... POLLUTION PREVENTION REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1040 Response plan...-based support or advice; (ii) The individuals who shall be notified of a casualty potentially affecting... coordinator responsible for overseeing or directing those actions. (4) The organizational structure that will...

  11. Model State Plan Characteristics. A Guide for Refining State Plans for Career Education.

    Science.gov (United States)

    Mitchell, Anita

    This guide for refining state plans for career education was developed to assist states in revision of their state plans to satisfy requirements of Public Law 95-207. The guide is divided into fourteen chapters. Chapter 1, the introduction, contains background information on the assessment conducted to develop the guidelines. (A full report of…

  12. Evidence-based guidelines

    DEFF Research Database (Denmark)

    Wattjes, Mike P; Rovira, Àlex; Miller, David

    2015-01-01

    . This use of MRI can help predict treatment response and assess the efficacy and safety of new therapies. In the second part of the MAGNIMS (Magnetic Resonance Imaging in MS) network's guidelines on the use of MRI in MS, we focus on the implementation of this technique in prognostic and monitoring tasks. We...

  13. Assessing the readiness of a school system to adopt food allergy management guidelines.

    Science.gov (United States)

    Eldredge, Christina; Patterson, Leslie; White, Brenda; Schellhase, Kenneth

    2014-08-01

    The prevalence of potentially fatal food allergies in school-aged children is rising. It is important for schools to have a food allergy management policy and an emergency action plan for each affected student. To examine the current status of food allergy guideline and/or policy implementation and adoption in a large school system in southeastern Wisconsin. A 24-item anonymous electronic survey was developed and completed by school principals and administrators in the Archdiocese of Milwaukee School System (approximately 125 schools) in southeastern Wisconsin. One in 4 responding schools reported no guidelines or policy. Schools that reported having students with special needs due to food allergy were more likely to have a local food allergy policy compared to schools that did not report having students with food allergy special needs (OR 6.3, 1.5-26, P = 0.01). Schools with food allergy guidelines/policies were 3.5 times more likely to require student individual action plans than schools with no guidelines or policies (OR 3.5, 1.00-12.2, P = 0.05). Gaps in evidence-based food allergy policy implementation were found in this school system. Schools with food-allergic children with special needs were more likely to have guidelines/policy, however, they were not more likely to require emergency action plans. The majority of schools (66, 90%) reported interest in receiving further information or training on food allergy management.

  14. Postoperative Radiotherapy for Prostate Cancer: A Comparison of Four Consensus Guidelines and Dosimetric Evaluation of 3D-CRT Versus Tomotherapy IMRT

    International Nuclear Information System (INIS)

    Malone, Shawn; Croke, Jennifer; Roustan-Delatour, Nicolas; Belanger, Eric; Avruch, Leonard; Malone, Colin; Morash, Christopher; Kayser, Cathleen; Underhill, Kathryn; Li Yan; Malone, Kyle; Nyiri, Balazs; Spaans, Johanna

    2012-01-01

    Purpose: Despite the benefits of adjuvant radiotherapy after radical prostatectomy, approximately one-half of patients relapse. Four consensus guidelines have been published (European Organization for Research and Treatment of Cancer, Faculty of Radiation Oncology Genito-Urinary Group, Princess Margaret Hospital, Radiation Therapy Oncology Group) with the aim of standardizing the clinical target volume (CTV) delineation and improve outcomes. To date, no attempt has been made to compare these guidelines in terms of treatment volumes or organ at risk (OAR) irradiation. The extent to which the guideline-derived plans meet the dosimetric constraints of present trials or of the Quantitative Analysis of Normal Tissue Effects in the Clinic (QUANTEC) trial is also unknown. Our study also explored the dosimetric benefits of intensity-modulated radiotherapy (IMRT). Methods and Materials: A total of 20 patients treated with postoperative RT were included. The three-dimensional conformal radiotherapy (3D-CRT) plans were applied to cover the guideline-generated planning target volumes (66 Gy in 33 fractions). Dose–volume histograms (DVHs) were analyzed for CTV/planning target volume coverage and to evaluate OAR irradiation. The OAR DVHs were compared with the constraints proposed in the QUANTEC and Radiotherapy and Androgen Deprivation In Combination After Local Surgery (RADICALS) trials. 3D-CRT plans were compared with the tomotherapy plans for the Radiation Therapy Oncology Group planning target volume to evaluate the advantages of IMRT. Results: The CTV differed significantly between guidelines (p < 0.001). The European Organization for Research and Treatment of Cancer-CTVs were significantly smaller than the other CTVs (p < 0.001). Differences in prostate bed coverage superiorly accounted for the major volumetric differences between the guidelines. Using 3D-CRT, the DVHs rarely met the QUANTEC or RADICALS rectal constraints, independent of the guideline used. The RADICALS

  15. Problems related to public perceptions of radiological emergency planning and response

    International Nuclear Information System (INIS)

    Reilly, Margaret A.

    1989-01-01

    Beyond the scientific, the administrative and procedural issues of radiological emergency planning and response there is the issue of public perception. This paper emphasises that, radiation crises being a rare occurrence there is no enough database for generating scholarly quantitative reports. It suggests the need for disseminating timely and accurate information through a single spokesman from a responsible public agency

  16. A landscape analysis plan

    Science.gov (United States)

    Nancy E. Fleenor

    2002-01-01

    A Landscape Analysis Plan (LAP) sets out broad guidelines for project development within boundaries of the Kings River Sustainable Forest Ecosystems Project. The plan must be a dynamic, living document, subject to change as new information arises over the course of this very long-term project (several decades). Two watersheds, each of 32,000 acres, were dedicated to...

  17. Utilization of the American Telemedicine Association's Clinical Practice Guidelines

    Science.gov (United States)

    Antoniotti, Nina; Bernard, Jordana

    2013-01-01

    Abstract Background: The American Telemedicine Association (ATA) Standards and Guidelines Committee develops practice standards and guidelines. Key to the Committee's mission is dissemination so the standards can be used in the practice of telemedicine. Over a 2-year period, when a standards document was accessed from the ATA Web site, a short survey was completed, but it did not assess how the documents were used once downloaded. A more formal survey was conducted to determine the impact ATA standards and guidelines are having on healthcare delivery via telemedicine. Materials and Methods: A survey was developed and distributed via SurveyMonkey to 13,177 ATA members and nonmembers in November 2011. Results were compiled and analyzed after a 90-day open period for responses to be submitted. Results: The majority of respondents (96%) believe the practice of telemedicine/telehealth should have standards and guidelines and that the ATA and other professional societies/associations should be responsible for developing them. The top uses of guidelines include guidance for clinical practice, training, gaining reimbursement, and research. Respondents indicating a need for standards and guidelines said the ATA (78.7%) and other professional societies/associations (74.5%) should be responsible for development. When asked to list specific practice guidelines or standards they are using for telehealth, the majority (21.5%) are using in-house (e.g., hospital, company)-developed guidelines, followed by those from professional associations/societies (20.4%) and those developed by the ATA (18.2%). Conclusions: Overall, the survey results indicate guidelines documents developed by the ATA and other professional societies and those developed in-house are being regularly accessed and used in both public and private sectors. Practitioners of telemedicine believe that standards and guidelines are needed for guidance for clinical practice, training, gaining reimbursement, and research

  18. Guidelines for interim storage of low level waste

    International Nuclear Information System (INIS)

    Hornibrook, C.; Castagnacci, A.; Clymer, G.; Kelly, J.; Naughton, M.; Saunders, P.; Stoner, P.; Walker, N.; Cazzolli, R.; Dettenmeier, R.; Loucks, L.; Rigsby, M.; Spall, M.; Strum, M.

    1992-12-01

    This report presents an overview of on-site storage of Low Level Waste while providing guidelines for using the complete Interim On-Site Storage of Low Level Waste report series. Overall, this report provides a methodology for planning and implementing on-site storage

  19. SU-F-BRA-14: Optimization of Dosimetric Guidelines for Accelerated Partial Breast Irradiation (APBI) Using the Strut-Adjusted Volume Implant (SAVI)

    International Nuclear Information System (INIS)

    Mooney, K; Altman, M; Garcia-Ramirez, J; Thomas, M; Zoberi, I; Mullen, D; DeWees, T; Esthappan, J

    2015-01-01

    Purpose: Treatment planning guidelines for accelerated partial breast irradiation (ABPI) using the strut-adjusted volume implant (SAVI) are inconsistent between the manufacturer and NSABP B-39/RTOG 0413 protocol. Furthermore neither set of guidelines accounts for different applicator sizes. The purpose of this work is to establish guidelines specific to the SAVI that are based on clinically achievable dose distributions. Methods: Sixty-two consecutive patients were implanted with a SAVI and prescribed to receive 34 Gy in 10 fractions twice daily using high dose-rate (HDR) Ir-192 brachytherapy. The target (PTV-EVAL) was defined per NSABP. The treatments were planned and evaluated using a combination of dosimetric planning goals provided by the NSABP, the manufacturer, and our prior clinical experience. Parameters evaluated included maximum doses to skin and ribs, and volumes of PTV-EVAL receiving 90%, 95%, 100%, 150%, and 200% of the prescription (V90, etc). All target parameters were evaluated for correlation with device size using the Pearson correlation coefficient. Revised dosimetric guidelines for target coverage and heterogeneity were determined from this population. Results: Revised guidelines for minimum target coverage (ideal in parentheses): V90≥95%(97%), V95≥90%(95%), V100≥88%(91%). The only dosimetric parameters that were significantly correlated (p<0.05) with device size were V150 and V200. Heterogeneity criteria were revised for the 6–1 Mini/6-1 applicators to V150≤30cc and V200≤15cc, and unchanged for the other sizes. Re-evaluation of patient plans showed 90% (56/62) met the revised minimum guidelines and 76% (47/62) met the ideal guidelines. All and 56/62 patients met our institutional guidelines for maximum skin and rib dose, respectively. Conclusions: We have optimized dosimetric guidelines for the SAVI applicators, and found that implementation of these revised guidelines for SAVI treatment planning yielded target coverage exceeding

  20. Emergency response plan for accidents in Saudi Arabia

    International Nuclear Information System (INIS)

    Al-Solaiman, K.M.; Al-Arfaj, A.M.; Farouk, M.A.

    2000-01-01

    This paper presents a brief description of the general emergency plan for accidents involving radioactive materials in the Kingdom of Saudi Arabia. Uses of radioactive materials and radiation sources and their associated potential accident are specified. Most general accident scenarios of various levels have been determined. Protective measures have been specified to reduce individual and collective doses arising during accident situations. Intervention levels for temporary exposure situations, as established in the IAEA's basic safety standards for protection against ionising radiation and for the safety of radiation sources, are adopted as national intervention levels. General procedures for implementation of the response plan, including notification and radiological monitoring instrumentation and equipment, are described and radiation monitoring teams are nominated. Training programs for the different parties which may be called upon to respond are studied and will be started. (author)

  1. Severe accident management guidelines tool

    International Nuclear Information System (INIS)

    Gutierrez Varela, Javier; Tanarro Onrubia, Augustin; Martinez Fanegas, Rafael

    2014-01-01

    Severe Accident is addressed by means of a great number of documents such as guidelines, calculation aids and diagnostic trees. The response methodology often requires the use of several documents at the same time while Technical Support Centre members need to assess the appropriate set of equipment within the adequate mitigation strategies. In order to facilitate the response, TECNATOM has developed SAMG TOOL, initially named GGAS TOOL, which is an easy to use computer program that clearly improves and accelerates the severe accident management. The software is designed with powerful features that allow the users to focus on the decision-making process. Consequently, SAMG TOOL significantly improves the severe accident training, ensuring a better response under a real situation. The software is already installed in several Spanish Nuclear Power Plants and trainees claim that the methodology can be followed easier with it, especially because guidelines, calculation aids, equipment information and strategies availability can be accessed immediately (authors)

  2. Staff supplement to the draft report on human engineering guide to control room evaluation: response to comments, sample checklist, draft systems review guidelines, and evaluation procedures

    International Nuclear Information System (INIS)

    1981-03-01

    This staff supplement to Draft Report NUREG/CR-1580, Human Engineering Guide to Control Room Evaluation, provides staff responses to comments on the draft report and supplemental material not provided in the draft report. The supplemental material includes new draft guidelines for the systems review of nuclear power plant control rooms and sample checklists and corresponding human engineering guidelines

  3. The ASM Curriculum Guidelines for Undergraduate Microbiology: A Case Study of the Advocacy Role of Societies in Reform Efforts.

    Science.gov (United States)

    Horak, Rachel E A; Merkel, Susan; Chang, Amy

    2015-05-01

    A number of national reports, including Vision and Change in Undergraduate Biology Education: A Call to Action, have called for drastic changes in how undergraduate biology is taught. To that end, the American Society for Microbiology (ASM) has developed new Curriculum Guidelines for undergraduate microbiology that outline a comprehensive curriculum for any undergraduate introductory microbiology course or program of study. Designed to foster enduring understanding of core microbiology concepts, the Guidelines work synergistically with backwards course design to focus teaching on student-centered goals and priorities. In order to qualitatively assess how the ASM Curriculum Guidelines are used by educators and learn more about the needs of microbiology educators, the ASM Education Board distributed two surveys to the ASM education community. In this report, we discuss the results of these surveys (353 responses). We found that the ASM Curriculum Guidelines are being implemented in many different types of courses at all undergraduate levels. Educators indicated that the ASM Curriculum Guidelines were very helpful when planning courses and assessments. We discuss some specific ways in which the ASM Curriculum Guidelines have been used in undergraduate classrooms. The survey identified some barriers that microbiology educators faced when trying to adopt the ASM Curriculum Guidelines, including lack of time, lack of financial resources, and lack of supporting resources. Given the self-reported challenges to implementing the ASM Curriculum Guidelines in undergraduate classrooms, we identify here some activities related to the ASM Curriculum Guidelines that the ASM Education Board has initiated to assist educators in the implementation process.

  4. The ASM Curriculum Guidelines for Undergraduate Microbiology: A Case Study of the Advocacy Role of Societies in Reform Efforts

    Directory of Open Access Journals (Sweden)

    Rachel E.A. Horak

    2015-03-01

    Full Text Available A number of national reports, including Vision and Change in Undergraduate Biology Education: A Call to Action, have called for drastic changes in how undergraduate biology is taught. To that end, the American Society for Microbiology (ASM developed new Curriculum Guidelines for undergraduate microbiology that outline a comprehensive curriculum for any undergraduate introductory microbiology course or program of study. Designed to foster enduring understanding of core microbiology concepts, the Guidelines work synergistically with backwards course design to focus teaching on student-centered goals and priorities.  In order to qualitatively assess how the ASM Curriculum Guidelines are used by educators and learn more about the needs of microbiology educators, the ASM Education Board distributed two surveys to the ASM education community. In this report, we discuss results of these surveys (353 responses. We found that the ASM Curriculum Guidelines are being implemented in many different types of courses at all undergraduate levels. Educators indicated that the ASM Curriculum Guidelines were very helpful when planning courses and assessments. We discuss some specific ways in which the ASM Curriculum Guidelines have been used in undergraduate classrooms. The survey identified some barriers that microbiology educators faced when trying to adopt the ASM Curriculum Guidelines, including lack of time, lack of financial resources, and lack of supporting resources. Given the self-reported challenges to implementing the ASM Curriculum Guidelines in undergraduate classrooms, we identify here some activities related to the ASM Curriculum Guidelines that the ASM Education Board has initiated to assist educators in the implementation process.

  5. Development of a statewide hospital plan for radiologic emergencies

    International Nuclear Information System (INIS)

    Dainiak, Nicholas; Delli Carpini, Domenico; Bohan, Michael; Werdmann, Michael; Wilds, Edward; Barlow, Agnus; Beck, Charles; Cheng, David; Daly, Nancy; Glazer, Peter; Mas, Peter; Nath, Ravinder; Piontek, Gregory; Price, Kenneth; Albanese, Joseph; Roberts, Kenneth; Salner, Andrew L.; Rockwell, Sara

    2006-01-01

    Although general guidelines have been developed for triage of victims in the field and for hospitals to plan for a radiologic event, specific information for clinicians and administrators is not available for guidance in efficient management of radiation victims during their early encounter in the hospital. A consensus document was developed by staff members of four Connecticut hospitals, two institutions of higher learning, and the State of Connecticut Department of Environmental Protection and Office of Emergency Preparedness, with assistance of the American Society for Therapeutic Radiology and Oncology. The objective was to write a practical manual for clinicians (including radiation oncologists, emergency room physicians, and nursing staff), hospital administrators, radiation safety officers, and other individuals knowledgeable in radiation monitoring that would be useful for evaluation and management of radiation injury. The rationale for and process by which the radiation response plan was developed and implemented in the State of Connecticut are reviewed. Hospital admission pathways are described, based on classification of victims as exposed, contaminated, and/or physically injured. This manual will be of value to those involved in planning the health care response to a radiologic event

  6. Response to planned treatment interruptions in HIV infection varies across childhood

    DEFF Research Database (Denmark)

    NN, NN; Valerius, Niels Henrik

    2010-01-01

    OBJECTIVE: To evaluate clinical, immunological and virological consequences of CD4-guided antiretroviral therapy (ART) planned treatment interruptions (PTIs) compared with continuous therapy in children with chronic HIV infection in the Paediatric European Network for Treatment of AIDS 11 trial......) or PTI (56). In PTI, ART was restarted if confirmed CD4% was less than 20% or more than 48 weeks had been spent off ART. The primary outcome was Centers for Disease Control and Prevention (CDC) stage C event, death or CD4% less than 15% (and CD4 cell count less than 200 cells/microl for children aged 7......-term follow-up in Paediatric European Network for Treatment of AIDS 11 trial are ongoing. Further research into the role of treatment interruption in children is required, particularly, as guidelines now recommend early ART for all infected infants....

  7. Leadership Succession Planning in Catholic Education: An Ongoing Plan for Leadership Development, Identification, and Selection

    Science.gov (United States)

    Fitzgerald, Mary; Sabatino, Anthony

    2014-01-01

    The fundamental elements of successful leadership succession in any organization are recognizing the inevitability of leadership change and the necessity of a plan for leadership succession. This book provides a rationale and planning guideline for board chairs, superintendents, and superiors of religious communities to use when the need arises to…

  8. 78 FR 48159 - Preliminary 2012 Effluent Guidelines Program Plan and 2011 Annual Effluent Guidelines Review Report

    Science.gov (United States)

    2013-08-07

    ... publish a preliminary plan in the odd numbered years and a final plan in the even numbered years. The... necessary before concluding the review of the three remaining point source categories: Pulp, Paper and... standards for the 2012 reviews. These methodologies included: Identifying pass-through pollutants in sewage...

  9. 33 CFR 155.1230 - Response plan development and evaluation criteria.

    Science.gov (United States)

    2010-07-01

    ... impact; (2) Oil recovery devices appropriate for the type of animal fats or vegetable oils carried; and (3) Other appropriate equipment necessary to respond to a discharge involving the type of animal fats... VESSELS Response plan requirements for vessels carrying animal fats and vegetable oils as a primary cargo...

  10. International Association of Dental Traumatology guidelines for the management of traumatic dental injuries

    DEFF Research Database (Denmark)

    Diangelis, Anthony J; Andreasen, Jens O; Ebeleseder, Kurt A

    2012-01-01

    Traumatic dental injuries (TDIs) of permanent teeth occur frequently in children and young adults. Crown fractures and luxations are the most commonly occurring of all dental injuries. Proper diagnosis, treatment planning and followup are important for improving a favorable outcome. Guidelines sh...... goal of these guidelines is to delineate an approach for the immediate or urgent care of TDIs. In this first article, the IADT Guidelines for management of fractures and luxations of permanent teeth will be presented....

  11. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water

  12. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  13. European Patient Summary Guideline: Focus on Greece.

    Science.gov (United States)

    Berler, Alexander; Tagaris, Anastassios; Chronaki, Catherine

    2016-01-01

    The European Patient Summary (PS) guideline specifies a minimal dataset of essential and important information for unplanned or emergency care initially defined in the epSOS project with aim to improve patients' safety and quality of Care. The eHealth Network of European Union (EU) Member State (MS) representatives established under Article 14 of the EU directive 2011/24 on patient rights to cross-border healthcare adopted PS guideline in November 2013 and since then the guideline has been part of MS strategic eHealth implementation plans, standardization efforts, and concrete regional, national, European and international projects. This paper reviews implementation efforts for the implementation of an operational patient summary service in Greece drawing on challenges and lessons learned for sustainable standards-based large scale eHealth deployment in Europe and abroad, as well as the reuse of best practices from international standards and integration profiles.

  14. Technical Basis for Radiological Emergency Plan Annex for WTD Emergency Response Plan: West Point Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hickey, Eva E.; Strom, Daniel J.

    2005-08-01

    Staff of the King County Wastewater Treatment Division (WTD) have concern about the aftermath of a radiological dispersion event (RDE) leading to the introduction of significant quantities of radioactive material into the combined sanitary and storm sewer system in King County, Washington. Radioactive material could come from the use of a radiological dispersion device (RDD). RDDs include "dirty bombs" that are not nuclear detonations but are explosives designed to spread radioactive material (National Council on Radiation Protection and Measurements (NCRP) 2001). Radioactive material also could come from deliberate introduction or dispersion of radioactive material into the environment, including waterways and water supply systems. This document, Volume 3 of PNNL-15163 is the technical basis for the Annex to the West Point Treatment Plant (WPTP) Emergency Response Plan related to responding to a radiological emergency at the WPTP. The plan primarily considers response to radioactive material that has been introduced in the other combined sanitary and storm sewer system from a radiological dispersion device, but is applicable to any accidental or deliberate introduction of materials into the system.

  15. Guidelines in lower-middle income countries.

    Science.gov (United States)

    Olayemi, Edeghonghon; Asare, Eugenia V; Benneh-Akwasi Kuma, Amma A

    2017-06-01

    Guidelines include recommendations intended to optimize patient care; used appropriately, they make healthcare consistent and efficient. In most lower-middle income countries (LMICs), there is a paucity of well-designed guidelines; as a result, healthcare workers depend on guidelines developed in Higher Income Countries (HICs). However, local guidelines are more likely to be implemented because they are applicable to the specific environment; and consider factors such as availability of resources, specialized skills and local culture. If guidelines developed in HICs are to be implemented in LMICs, developers need to incorporate local experts in their development. Involvement of local stakeholders may improve the rates of implementation by identifying and removing barriers to implementation in LMICs. Another option is to encourage local experts to adapt them for use in LMICs; these guidelines may recommend strategies different from those used in HICs, but will be aimed at achieving the best practicable standard of care. Infrastructural deficits in LMICs could be improved by learning from and building on the successful response to the human immunodeficiency virus/acquired immunodeficiency syndrome pandemic through interactions between HICs and LMICs. Similarly, collaborations between postgraduate medical colleges in both HICs and LMICs may help specialist doctors training in LMICs develop skills required for guideline development and implementation. © 2017 John Wiley & Sons Ltd.

  16. Applications of NTCP calculations to treatment planning

    International Nuclear Information System (INIS)

    Kutcher, G.J.

    1995-01-01

    A fundamental step in the treatment decision process is the evaluation of a treatment plan. Most often treatment plans are judged by tradition using guidelines like target homogeneity and maximum dose to non-target tissues. While such judgments implicitly assume a relationship between dose distribution parameters and patient response, the judgment process is essentially supported by clinical outcomes from previous treatments. With the development of conformal therapy, new and unusual dose distributions and escalated doses are possible, while the clinical consequences are unknown. this situation has instigated attempts to place plan evaluation on a more systematic platform. One such endeavor has centered around attempts to calculate normal tissue complication probability (NTCP) and its sibling, tumor control probability (TCP). This lecture will be composed of two parts. The first will begin with a review of two categories of NTCP models: (1) an 'empirical' approach, based upon a power-law relationship between partial organ tolerance and irradiated volume, and histogram reduction to account for inhomogeneous irradiation: (2) a 'statistical' approach in which local responses are combined according to the underlying tissue architecture. Since both rely upon clinical data - often of limited and questionable validity - we will review some examples from the clinical and biological literature. The second part of the lecture will review clinical applications of biological-index based models: ranking competing treatment plans; design of dose escalation protocols; optimization of treatment plans with intensity modulation. We will also demonstrate how biological indices can be used to derive dose-volume histograms which account for treatment uncertainty

  17. Assessing the integration of health center and community emergency preparedness and response planning.

    Science.gov (United States)

    Wineman, Nicole V; Braun, Barbara I; Barbera, Joseph A; Loeb, Jerod M

    2007-11-01

    To assess the state of health center integration into community preparedness, we undertook a national study of linkages between health centers and the emergency preparedness and response planning initiatives in their communities. The key objectives of this project were to gain a better understanding of existing linkages in a nationally representative sample of health centers, and identify health center demographic and experience factors that were associated with strong linkages. The objectives of the study were to gain a baseline understanding of existing health center linkages to community emergency preparedness and response systems and to identify factors that were associated with strong linkages. A 60-item questionnaire was mailed to the population of health centers supported by the Health Resources and Services Administration's Bureau of Primary Health Care in February 2005. Results were aggregated and a chi square analysis identified factors associated with stronger linkages. Overall performance on study-defined indicators of strong linkages was low: 34% had completed a hazard vulnerability analysis in collaboration with the community emergency management agency, 30% had their role documented in the community plan, and 24% participated in community-wide exercises. Stronger linkages were associated with experience responding to a disaster and a perception of high risk for experiencing a disaster. The potential for health centers to participate in an integrated response is not fully realized, and their absence from community-based planning leaves an already vulnerable population at greater risk. Community planners should be encouraged to include health centers in planning and response and centers should receive more targeted resources for community integration.

  18. The implementation of the Plan Esperanza and response to the imPACT Review.

    Science.gov (United States)

    Vidaurre, Tatiana; Santos, Carlos; Gómez, Henry; Sarria, Gustavo; Amorin, Edgar; López, Marga; Regalado, Roxana; Manrique, Javier; Tarco, Duniska; Ayestas, Carlos; Calderón, Mónica; Mas, Luis; Neciosup, Silvia; Salazar, Miriam; Chávez, Juan Carlos; Ubillus, Milward; Limache, Abel; Ubillus, José Carlos; Navarro, Jeannie; Sarwal, Kavita; Sutcliffe, Simon; Gutiérrez-Aguado, Alfonso; Silva, Marianela; Mena, Amalia; Guillén, María Eugenia; Castañeda, Carlos; Abugattas, Julio

    2017-10-01

    Following the implementation of the National Cancer Prevention and Control Results-based Budget Programme (PpR Cancer-024) in 2011, the Peruvian Government approved the Plan Esperanza-a population-based national cancer control plan-in 2012. Legislation that ensured full government-supported funding for people who were otherwise unable to access or afford care and treatment accompanied the Plan. In 2013, the Ministry of Health requested an integrated mission of the Programme of Action for Cancer Therapy (imPACT) report to strengthen cancer control in Peru. The imPACT Review, which was executed in 2014, assessed Peru's achievements in cancer control, and areas for improvement, including cancer control planning, further development of population-based cancer registration, increased prevention, early diagnosis, treatment and palliative care, and the engagement and participation of civil society in the health-care system. This Series paper gives a brief history of the development of the Plan Esperanza, describes the innovative funding model that supports it, and summarises how funds are disseminated on the basis of disease, geography, and demographics. An overview of the imPACT Review, and the government's response in the context of the Plan Esperanza, is provided. The development and execution of the Plan Esperanza and the execution of and response to the imPACT Review demonstrates the Peruvian Government's commitment to fighting cancer across the country, including in remote and urban areas. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. Value and limitations of clinical practice guidelines in neonatology.

    Science.gov (United States)

    Polin, Richard A; Lorenz, John M

    2015-12-01

    Given the overwhelming size of the neonatal literature, clinicians must rely upon expert panels such as the Committee on Fetus and Newborn in the USA and the National Institute for Healthcare and Excellence in the UK for guidance. Guidelines developed by expert panels are not equivalent to evidence-based medicine and are not rules, but do provide evidence-based recommendations (when possible) and at minimum expert consensus reports. The standards used to develop evidence-based guidelines differ among expert panels. Clinicians must be able judge the quality of evidence from an expert panel, and decide whether a recommendation applies to their neonatal intensive care unit or infant under their care. Furthermore, guidelines become outdated within a few years and must be revised or discarded. Clinical practice guidelines should not always be equated with standard of care. However, they do provide a framework for determining acceptable care. Clinicians do not need to follow guidelines if the recommendations are not applicable to their population or infant. However, if a plan of care is not consistent with apparently applicable clinical practice guidelines, the medical record should include an explanation for the deviation from the relevant practice guideline. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. Experts' perspective on the performance of Chinese technical guidelines for Plan Environmental Impact Assessment

    International Nuclear Information System (INIS)

    He Jia; Sun Sun; Bao Cunkuan; Chen Fan; Jiang Dahe

    2011-01-01

    This research was to evaluate the Technical Guideline (HJ/T130-2003) effectiveness based on data resource from a questionnaire survey and interviews on EIA experts. The result demonstrated that the guideline served mainly as a quality control measure for PEIA products, and only a small proportion of experts considered it effective due to its inconsistency with the newly released Chinese PEIA Regulation (2009) and poor practicability. Current status of SEA implementation in China was also studied in terms of application fields, effectiveness evaluation, and major issues to affect SEA, to conclude that SEA implementation in China is premature, and with limited effectiveness. The major problem was the lack of effective methodologies and technical tools. Recommendations for revising the PEIA Guideline and advices to improving SEA implementation in China were accordingly proposed.

  1. Clinical Practice Guidelines for the Medical Management of Nonhospitalized Ulcerative Colitis: The Patient Perspective

    Directory of Open Access Journals (Sweden)

    A Hillary Steinhart

    2015-01-01

    Full Text Available A series of clinical practice guidelines were recently developed by the Canadian Association of Gastroenterology (CAG to provide clinicians with recommendations for the medical management of nonhospitalized ulcerative colitis (UC patients. These guidelines were developed, reviewed and agreed on by expert clinicians and methodologists. Following the finalization of the guidelines, a group of patients with UC as well as several inflammatory bowel disease clinicians, were brought together for a half-day workshop to provide feedback from the patient perspective. At the workshop, the guideline development process was described and the guidelines were reviewed to ensure comprehension. Patients then had the opportunity to provide their insight to the relevance of the guideline development process and the content of the guidelines as it related to their personal experiences with UC. The patient group believed that, although the new guidelines will be a tremendous resource for the health care provider community, a more ‘lay-friendly’ version would better facilitate dialogue between patients and their health care practitioners. The importance of the patient/physician relationship is paramount when making decisions regarding treatment plans, in which patient preferences play a key role in determining the most appropriate therapy and dosing regimen, which, in turn, impact the likelihood of adherence to the treatment plan. It was also believed that quality of life issues were not fully addressed in the guidelines. Much could be learned from shared experiences and coping strategies that would empower patients to take charge of their health and become equal partners with their care providers.

  2. Energy Design Guidelines for High Performance Schools: Tropical Island Climates

    Energy Technology Data Exchange (ETDEWEB)

    2004-11-01

    The Energy Design Guidelines for High Performance Schools--Tropical Island Climates provides school boards, administrators, and design staff with guidance to help them make informed decisions about energy and environmental issues important to school systems and communities. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school in tropical island climates. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs.

  3. Bridge removal plan requirements.

    Science.gov (United States)

    2011-04-15

    This report provides resources that detail specifications and guidelines related to bridge removal plans across the : United States. We have organized the information into three sections: : ! National Guidance : Includes language from AASHTO specific...

  4. 40 CFR 256.04 - State plan approval, financial assistance.

    Science.gov (United States)

    2010-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements, Definitions § 256.04 State plan approval, financial assistance. (a) The...

  5. Condensate polishing guidelines for PWR and BWR plants

    International Nuclear Information System (INIS)

    Robbins, P.; Crinigan, P.; Graham, B.; Kohlmann, R.; Crosby, C.; Seager, J.; Bosold, R.; Gillen, J.; Kristensen, J.; McKeen, A.; Jones, V.; Sawochka, S.; Siegwarth, D.; Keeling, D.; Polidoroff, T.; Morgan, D.; Rickertsen, D.; Dyson, A.; Mills, W.; Coleman, L.

    1993-03-01

    Under EPRI sponsorship, an industry committee, similar in form and operation to other guideline committees, was created to develop Condensate Polishing Guidelines for both PWR and BWR systems. The committee reviewed the available utility and water treatment industry experience on system design and performance and incorporated operational and state-of-the-art information into document. These guidelines help utilities to optimize present condensate polisher designs as well as be a resource for retrofits or new construction. These guidelines present information that has not previously been presented in any consensus industry document. The committee generated guidelines that cover both deep bed and powdered resin systems as an integral part of the chemistry of PWR and BWR plants. The guidelines are separated into sections that deal with the basis for condensate polishing, system design, resin design and application, data management and performance and management responsibilities

  6. Guidelines and algorithms for managing the difficult airway.

    Science.gov (United States)

    Gómez-Ríos, M A; Gaitini, L; Matter, I; Somri, M

    2018-01-01

    The difficult airway constitutes a continuous challenge for anesthesiologists. Guidelines and algorithms are key to preserving patient safety, by recommending specific plans and strategies that address predicted or unexpected difficult airway. However, there are currently no "gold standard" algorithms or universally accepted standards. The aim of this article is to present a synthesis of the recommendations of the main guidelines and difficult airway algorithms. Copyright © 2017 Sociedad Española de Anestesiología, Reanimación y Terapéutica del Dolor. Publicado por Elsevier España, S.L.U. All rights reserved.

  7. Computerization of guidelines: towards a "guideline markup language".

    Science.gov (United States)

    Dart, T; Xu, Y; Chatellier, G; Degoulet, P

    2001-01-01

    Medical decision making is one of the most difficult daily tasks for physicians. Guidelines have been designed to reduce variance between physicians in daily practice, to improve patient outcomes and to control costs. In fact, few physicians use guidelines in daily practice. A way to ease the use of guidelines is to implement computerised guidelines (computer reminders). We present in this paper a method of computerising guidelines. Our objectives were: 1) to propose a generic model that can be instantiated for any specific guidelines; 2) to use eXtensible Markup Language (XML) as a guideline representation language to instantiate the generic model for a specific guideline. Our model is an object representation of a clinical algorithm, it has been validated by running two different guidelines issued by a French official Agency. In spite of some limitations, we found that this model is expressive enough to represent complex guidelines devoted to diabetes and hypertension management. We conclude that XML can be used as a description format to structure guidelines and as an interface between paper-based guidelines and computer applications.

  8. Institutional plan FY 1998--FY 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The Institutional Plan has been rearranged this year as a reflection of new Department of Energy (DOE) guidelines and to better illustrate the Laboratory`s mission-oriented focus. In Section 1 of this plan, the authors set forth their vision, mission, core competencies, strategic view, and related material. This section illustrates integration with the vision, mission, priorities, and core businesses of DOE. They define strategies, tactics, and guidelines and describe how they measure progress. In Section 2, they have elaborated on how they plan to address the Laboratory`s mission, describing programs and activities in the context of their role in this mission. Section 3 contains information on their approach to managing their business and operations. First they address the most critical issue safety. In this section, they confirm that Los Alamos is addressing the DOE critical success factors and describe the initiatives and plans that make their mission successful and leads them toward their vision. Section 4 contains details of their resources. 44 figs., 56 tabs.

  9. GUIDELINES FOR TRAINING SITUATION ANALYSIS (TSA). FINAL REPORT.

    Science.gov (United States)

    CHENZOFF, ANDREW P.; FOLLEY, JOHN D., JR.

    THESE GUIDELINES REPRESENT A TEXTBOOK FOR INSTRUCTION IN THREE PHASES OF TRAINING SITUATION ANALYSIS (TSA), A STANDARDIZED PROCEDURE DEVELOPED BY THE NAVAL TRAINING DEVICE CENTER FOR SYSTEMATICALLY GATHERING AND INTERPRETING THE INFORMATION RELEVANT TO THE PLANNING OF TRAINING AND TRAINING DEVICES. THREE PHASES OF TSA ARE DESCRIBED IN…

  10. Guidelines for standard and biuretic renogram in children

    International Nuclear Information System (INIS)

    Gordon, I.; Piepsz, A.; Colarinha, P.; Hahn, K.; Fischer, S.; Porn, U.; Sixt, R.; Velzen, J. van

    2000-01-01

    The guidelines are intended to help nuclear medical teams in their daily routine. The information given relates to aspects such as data acquisition, evaluation and interpretation, and indications for pediatric renal functional scintigraphy. The guidelines have been elaborated in response to a request of EANM and the American Society of Nuclear Medicine, who expressed the need for guidelines on recommended procedures for most of the standard nuclear medical examinations. The guidelines express the opinion of the Paediatric Committee of the EANM, and should be seen in the context of generally accepted basic principles in nuclear medicine, as well as local and national regulatory standards in radiation protection. (orig./CB) [de

  11. Procurement guideline for oil recovery boats; Oeljyntorjuntaveneen hankintaohje

    Energy Technology Data Exchange (ETDEWEB)

    Pajala, J.

    2011-12-15

    These guidelines have been compiled to assist in the procurement of oil recovery boats, with the intention of ensuring that new boats meet the future needs of oil spill response operations and that procurement will be carried out in a manner that is economically sound and technologically well-founded. Furthermore, the guidelines are intended to encourage the development and adoption of new solutions for oil recovery boats. The issues covered by these guidelines include: Multiple uses of boats, classification of boats and class-specific requirements, the principle of sustainable development and the boats' lifecycle, qualification to be set for the crews, procurement timeline, regulations and guidelines, inspections and approvals. (orig.)

  12. Symptom relief in patients with pneumonia and dementia: implementation of a practice guideline.

    Science.gov (United States)

    van der Maaden, Tessa; van der Steen, Jenny T; Koopmans, Raymond T C M; Doncker, Sarah M M M; Anema, Johannes R; Hertogh, Cees M P M; de Vet, Henrica C W

    2017-08-01

    This study aimed to assess the degree of implementation and barriers encountered in the use of a practice guideline for optimal symptom relief for patients with dementia and pneumonia in Dutch nursing homes. A process evaluation included assessment of reach, fidelity, and dose delivered using researcher's observations, and dose received was addressed in a question "use of the practice guideline," which the physicians completed for each patient included in the study. Perceived barriers were assessed with a structured questionnaire (response 69%) and semi-structured interviews (n = 14), which were subject to qualitative content analysis. Of the 55 physicians involved in the intervention phase, 87% attended an implementation meeting; 20 physicians joined the study later (reach). The intervention was implemented as planned, and all intervention components were delivered by the researchers (fidelity and dose delivered). Thirty-six physicians included 109 patients. For 81% of the patients, the treating physician stated to have used the guideline (dose received). The guideline was perceived as providing a good overview of current practice, but some physicians had expected a more directive protocol or algorithm. Further, recommended regular observations of symptoms were rarely performed. Physician's often felt that "this is not different from what we usually do," and with the acute illness, there was not always enough time to (re)familiarize with the contents. The physicians used the practice guideline frequently despite important barriers. Future implementation may involve strategies such as multiple interactive meetings. Further, the greatest potential to alter usual practice should be emphasized, such as using observational instruments. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  13. Quality Assurance Plan, N springs expedited response action

    International Nuclear Information System (INIS)

    Jackson, G.J.

    1994-01-01

    This document is the Quality Assurance Plan (QAP) to be followed during the definitive design, construction, and operational phases for activities associated with the N Springs Expedited Response Action (ERA) for the 100-NR-2 Operable Unit (OU). Westinghouse Hanford Company (WHC) will comply with the US Department of Energy (DOE) Order 5700.6C, Quality Assurance (DOE 1989), and the US Environmental Protection Agency (EPA), EPA/530-SW-86-031, Technical Guidance Document: Construction Quality Assurance for Hazardous Waste Land Disposal Facilities (EPA 1986)

  14. Energy Design Guidelines for High Performance Schools: Tropical Island Climates

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-11-01

    Design guidelines outline high performance principles for the new or retrofit design of K-12 schools in tropical island climates. By incorporating energy improvements into construction or renovation plans, schools can reduce energy consumption and costs.

  15. Guidelines for developing transportation management plans in Virginia.

    Science.gov (United States)

    2005-01-01

    A transportation management plan (TMP) is a comprehensive program of traffic control, communication, operation, and demand management strategies designed to maintain acceptable levels of traffic flow in work zones. A systematic procedure and/or check...

  16. Sewage epidemiology and illicit drug research: the development of ethical research guidelines.

    Science.gov (United States)

    Prichard, Jeremy; Hall, Wayne; de Voogt, Pim; Zuccato, Ettore

    2014-02-15

    To discuss the need to develop ethical guidelines for researchers using sewage epidemiology to monitor drug use in the general population and specific precincts, including prisons, schools and workplaces. Describe current applications of sewage epidemiology, identify potential ethical risks associated with this science, and identify key means by which these risks may be mitigated through proportionate ethical guidance that allows this science to be fully developed. A rapidly advancing field of research is sewage epidemiology (SE) - the analysis of wastewater samples to monitor illicit drug use and other substances. Typically this research involves low ethical risks because individual participants cannot be identified and, consequently, review has been waived by human research ethics committees. In the absence of such oversight, ethical research guidelines are recommended for SE teams, peer reviewers and journal editors; guidelines will assist them to mitigate any risks in general population studies and studies of prisons, schools and workplaces. Potential harms include the stigmatisation of participants and, in the prison setting, austere policy responses to SE data that impact negatively upon inmate-participants. The risk of harm can be managed through research planning, awareness of the socio-political context in which results will be interpreted (or, in the case of media, sensationalised) and careful relations with industry partners. Ethical guidelines should be developed in consultation with SE scholars and be periodically amended. They should include publication processes that safeguard scientific rigour and be promulgated through existing research governance structures. Guidelines will assist to promote an ethical research culture among SE teams and scholars involved in the publication process and this will work to protect the reputation of the field. Copyright © 2014 Elsevier B.V. All rights reserved.

  17. NSPWG-recommended safety requirements and guidelines for SEI nuclear propulsion

    International Nuclear Information System (INIS)

    Marshall, A.C.; Lee, J.H.; McCulloch, W.H.; Sawyer, J.C. Jr.; Bari, R.A.; Brown, N.W.; Cullingford, H.S.; Hardy, A.C.; Remp, K.; Sholtis, J.A.

    1992-01-01

    An Interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top- level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of Safety Functional Requirements. In addition the NSPWG reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. Safety requirements were developed for reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, and safeguards. Guidelines were recommended for risk/reliability, operational safety, flight trajectory and mission abort, space debris and meteoroids, and ground test safety. In this paper the specific requirements and guidelines will be discussed

  18. Long-term pavement performance compliance with Department of Transportation information dissemination quality guidelines

    Science.gov (United States)

    2008-11-01

    This document provides information on the compliance of the LTPP program with the guidelines the Department of Transportation (DOT) issued Information Dissemination Quality Guidelines (IDQG). These guidelines were developed in response to requirement...

  19. Food selection criteria for disaster response planning in urban societies.

    Science.gov (United States)

    Wien, Michelle; Sabaté, Joan

    2015-05-12

    Nutrition professionals that have menu planning and disaster management responsibilities should consider factors that have transcended from ancient to current times, in addition to recognizing societal trends that have led to our current increased vulnerability in the event of a disaster. Hence, we proceeded to develop a set of "Disaster Response Diets" (DRDs) for use in urban societies inclusive of the aforementioned considerations. A three-phase multidimensional approach was used to identify food groups suitable for creating a set of DRDs. Phase One consisted of calculating the percent daily nutrient intake and Drewnowski's naturally nutrient rich (NNR) score for an individual or mean composite for one serving of food from 11 specific food groups. In Phase Two, in addition to nutrient density, the 11 food groups were evaluated and scored based on the following DRD planning criteria: storage and handling properties, preparation ease and, cultural acceptance/individual tolerance. During Phase Three, three DRDs were developed based upon the data retrieved from Phases one and two. In Phase One, the NNR scores ranged from 2.1 for fresh fruits to 28.1 for dry cereals, a higher score indicating a higher nutrient density. During Phase Two, a maximum score of 12 was possible based on appropriateness for a disaster situation. Five plant-based food groups (dry cereals, nuts, dried fruits, grains and legumes) achieved a score ranging between 7 and 12, whereas the five fresh food groups were deemed ineligible due to sanitation and perishability concerns. During Phase Three, three DRDs (milk-inclusive, milk-free and Grab-and-Go) were developed as benchmarks for disaster response planning. Plant-based DRDs are universally acceptable and tolerated across cultures and religions. Therefore, we suggest nutrition professionals consider using a plant-based approach for creating DRDs for public health institutions and organizations.

  20. Maintenance implementation plan for fuel supply shutdown

    International Nuclear Information System (INIS)

    Stephenson, R.L.

    1995-06-01

    This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ''MAINTENANCE MANAGEMENT PROGRAM'', that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan

  1. Improving Access to Quality Care in Family Planning: WHO's Four Cornerstones of Evidence-based Guidance

    Institute of Scientific and Technical Information of China (English)

    Shang-chun WU; Yan ZOU; K Church; O Meirik

    2007-01-01

    The four cornerstones of guidance in technique service of family planning are established by WHO based on high quality evidences. They have been updated according to the appearing new evidences, and the consensuses were reached by the international experts in this field. The four documents include Medical Eligibility Criteria for Contraceptive Use, Selected Practice Recommendations for Contraceptive Use, Decision-making Tool for Family Planning Clients and Providers and The Global Handbook for Family Planning Providers. The first two documents mainlyface to the policy-makers and programme managers and were treated as the important references for creating the local guideline. The other two documents were developed for the front-line health-care and family planning providers at different levels, which include plenty of essential technical information to help providers improve their ability in service delivery and counselling. China paid great attention to the introduction and application of WHO guidelines. As soon as the newer editions of these documents were available, the Chinese version would be followed. WHO guidelines have been primarily adapted with the newly issued national guideline, The Clinical Practical Skill Guidelines- Family Planning Part, which was established by China Medical Association. At the same time, the WHO guidelines have been introduced to some of the linicians and family planning providers at different levels. In the future, more special training courses will be introduced to the township level based on the needs of grassroot providers.

  2. Savannah River Site management response plan for chemical safety vulnerability field assessment. Revision 1

    International Nuclear Information System (INIS)

    Kahal, E.J.; Murphy, S.L.; Salaymeh, S.R.

    1994-09-01

    As part of the U.S. Department of Energy's (DOE) initiative to identify potential chemical safety vulnerabilities in the DOE complex, the Chemical Safety Vulnerability Core Working Group issued a field verification assessment report. While the report concluded that Savannah River Site (SRS) is moving in a positive direction, the report also identified five chemical safety vulnerabilities with broad programmatic impact that are not easily nor quickly remedied. The May 1994 SRS Management Response Plan addressed the five SRS vulnerabilities identified in the field assessment report. The SRS response plan listed observations supporting the vulnerabilities and any actions taken or planned toward resolution. Many of the observations were resolved by simple explanations, such as the existence of implementation plans for Safety Analysis Report updates. Recognizing that correcting individual observations does not suffice in remedying the vulnerabilities, a task team was assembled to address the broader programmatic issues and to recommend corrective actions

  3. Update and revision of WHO air quality guidelines for Europe

    Energy Technology Data Exchange (ETDEWEB)

    Younes, M. [WHO European Centre for Environment and Health, Bilthoven (Netherlands). Bilthoven Div.

    1995-12-31

    The WHO Air Quality Guidelines for Europe (AQG), published in 1987, have provided a uniform basis for the development of strategies for the control of air pollution, and have contributed to the maintenance and improvement of public health in several countries. The aim of the guidelines is to provide a basis for protecting public health from adverse effects of air pollutants, and for eliminating or reducing to a minimum, those contaminants that are known or likely to be hazardous to human health and wellbeing. Since the publication of the first edition of the AQG, new scientific data in the fields of air pollution toxicology and epidemiology have accumulated and new developments in risk assessment methodologies have taken place, requiring updating and/or revision of the existing guidelines. This fact was recognized during the preparation of the initial work plan of the European Centre for Environment and Health, and it was recommended that the Centre undertake any necessary amendments and extensions to the Air Quality Guidelines. The updating procedure is being carried out in cooperation with the International Programme on Chemical Safety (IPCS) and the Commission of the European Communities (CEC) and will be implemented through working group meetings which require the preparation of working documents on specific air pollutants or mixtures and a final consultation to discuss the updated document.It was initiated by a Planning Meeting which was organized in January 1993. The purpose of the planning meeting was to set the framework for the updating and revision process, in particular to discuss the scope and purpose, the contents and the format of the revised AQG publication, to define the details of and the time schedule for the updating process and to identify the working groups needed and their way of operation. (author)

  4. Update and revision of WHO air quality guidelines for Europe

    Energy Technology Data Exchange (ETDEWEB)

    Younes, M [WHO European Centre for Environment and Health, Bilthoven (Netherlands). Bilthoven Div.

    1996-12-31

    The WHO Air Quality Guidelines for Europe (AQG), published in 1987, have provided a uniform basis for the development of strategies for the control of air pollution, and have contributed to the maintenance and improvement of public health in several countries. The aim of the guidelines is to provide a basis for protecting public health from adverse effects of air pollutants, and for eliminating or reducing to a minimum, those contaminants that are known or likely to be hazardous to human health and wellbeing. Since the publication of the first edition of the AQG, new scientific data in the fields of air pollution toxicology and epidemiology have accumulated and new developments in risk assessment methodologies have taken place, requiring updating and/or revision of the existing guidelines. This fact was recognized during the preparation of the initial work plan of the European Centre for Environment and Health, and it was recommended that the Centre undertake any necessary amendments and extensions to the Air Quality Guidelines. The updating procedure is being carried out in cooperation with the International Programme on Chemical Safety (IPCS) and the Commission of the European Communities (CEC) and will be implemented through working group meetings which require the preparation of working documents on specific air pollutants or mixtures and a final consultation to discuss the updated document.It was initiated by a Planning Meeting which was organized in January 1993. The purpose of the planning meeting was to set the framework for the updating and revision process, in particular to discuss the scope and purpose, the contents and the format of the revised AQG publication, to define the details of and the time schedule for the updating process and to identify the working groups needed and their way of operation. (author)

  5. Overview and status of Department of Energy siting guidelines

    International Nuclear Information System (INIS)

    Hanlon, C.

    1984-01-01

    One of the initial requirements of the Nuclear Waste Policy Act of 1982 was the development of siting guidelines for use in the selection of repository sites. The key issues raised during the consultation process are summarized as follows: the use of NRC and EPA regulations; the application of the guidelines in the siting process; the structure and specificity of the guidelines; the relationship between system and technical guidelines; the use of the systems approach in evaluating the overall performance of the repository system; the relative importance of individual guidelines; the degree of reliance placed on engineered barriers; impacts on the local population; impacts on the environment; protection of ground-water resources; and transportation. All of these issues were considered in revising the guidelines, and the responses to them are summarized in general terms

  6. Severe accident management at nuclear power plants - emergency preparedness and response actions

    International Nuclear Information System (INIS)

    Pawar, S.K.; Krishnamurthy, P.R.

    2015-01-01

    This paper describes the current level of emergency planning and preparedness and also improvement in the emergency management programme over the years including lessons learned from Fukushima accident, hazard analysis and categorization of nuclear facilities into hazard category for establishing the emergency preparedness class, classification of emergencies based on the Emergency Action Levels (EAL), development of EAL’s for PHWR, Generic Criteria in terms of projected dose for initiating protective actions (precautionary urgent protective actions, urgent protective actions, early protective actions), operational intervention levels (OIL), Emergency planning zones and distances, protection strategy and reference levels, use of residual dose for establishing reference levels for optimization of protection strategy, criteria for termination of emergency, transition of emergency exposure situation to existing exposure situation or planned exposure situation, criteria for medical managements of exposed persons and guidance for controlling the dose of emergency workers. This paper also highlights the EALs for typical PHWR type reactors for all types of emergencies (plant, site and offsite), transition from emergency operating procedures (EOP) to accident management guidelines (AMG) to emergency response actions and proposed implementation of guidelines

  7. Selecting and Planning for an Automated Library System: Guidelines for Libraries.

    Science.gov (United States)

    Piccininni, James

    Guidelines are given for automating a library. Issues arising in automation are illustrated through the experience of the Doherty Library of the University of St. Thomas, Houston (Texas). The first step is to decide what type of system is right for the needs of the library and its patrons. In considering vendors of systems, it is important to…

  8. Facility Response Plan (FRP) Points, Region 9, 2014, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — A Facility Response Plan (FRP) demonstrates a facility's preparedness to respond to a worst case oil discharge. Under the Clean Water Act, as amended by the Oil...

  9. Facility Response Plan (FRP) Points, Region 9, 2013, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — A Facility Response Plan (FRP) demonstrates a facility's preparedness to respond to a worst case oil discharge. Under the Clean Water Act, as amended by the Oil...

  10. Facility Response Plan (FRP) Points, Region 9, 2012, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — A Facility Response Plan (FRP) demonstrates a facility's preparedness to respond to a worst case oil discharge. Under the Clean Water Act, as amended by the Oil...

  11. Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

    Science.gov (United States)

    Hitz, F. R.

    1976-01-01

    The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

  12. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    International Nuclear Information System (INIS)

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie

    2013-01-01

    Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (∼2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ∼2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the

  13. Wireless application guidelines for usability design and evaluation for developing countries

    International Nuclear Information System (INIS)

    Khoja, S.A.; Ursani, A.A.; Ali, A.

    2009-01-01

    The aim of this paper is to provide guidelines for designing wireless applications. These guidelines are developed with the help of Human Computer Interaction based Usability Evaluation surveys and tests results. These guidelines will help in making wireless applications more usable and attractive for users and will help designers to plan effective interactive applications. The guidelines presented in the paper have been derived from the results of surveys, usability tests and SET (Summative Evaluation Tests) carried out over 200 people of Karachi, Pakistan, from different walks of life with different academic and professional backgrounds, making imperative suggestions not only to improve the usability of exciting features given in wireless and mobile products, but also provide suggestions to improve usability of basic components such as, text, navigation, interactivity, multimedia, control and behavior. (author)

  14. Sandia software guidelines, Volume 4: Configuration management

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    This volume is one in a series of Sandia Software Guidelines for use in producing quality software within Sandia National Laboratories. This volume is based on the IEEE standard and guide for software configuration management. The basic concepts and detailed guidance on implementation of these concepts are discussed for several software project types. Example planning documents for both projects and organizations are included.

  15. Transformation Planning of Ecotourism Systems to Invigorate Responsible Tourism

    OpenAIRE

    Yun Eui Choi; Minsun Doh; Samuel Park; Jinhyung Chon

    2017-01-01

    The purpose of this study is to introduce transformation plans that can stimulate responsible ecotourism by using systems thinking to solve ecotourism problems in Korea. Systems thinking is a research method used to understand the operating mechanisms of the variables that influence an entire system, in order to identify its problems. The four types of ecotourism systems are classified as follows: low-infrastructure and resident-initiated, high-infrastructure and resident-initiated, high-infr...

  16. Stakeholder insights on the planning and development of an independent benchmark standard for responsible food marketing.

    Science.gov (United States)

    Cairns, Georgina; Macdonald, Laura

    2016-06-01

    A mixed methods qualitative survey investigated stakeholder responses to the proposal to develop an independently defined, audited and certifiable set of benchmark standards for responsible food marketing. Its purpose was to inform the policy planning and development process. A majority of respondents were supportive of the proposal. A majority also viewed the engagement and collaboration of a broad base of stakeholders in its planning and development as potentially beneficial. Positive responses were associated with views that policy controls can and should be extended to include all form of marketing, that obesity and non-communicable diseases prevention and control was a shared responsibility and an urgent policy priority and prior experience of independent standardisation as a policy lever for good practice. Strong policy leadership, demonstrable utilisation of the evidence base in its development and deployment and a conceptually clear communications plan were identified as priority targets for future policy planning. Future research priorities include generating more evidence on the feasibility of developing an effective community of practice and theory of change, the strengths and limitations of these and developing an evidence-based step-wise communications strategy. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Development of the International Guidelines for Home Health Nursing.

    Science.gov (United States)

    Narayan, Mary; Farris, Cindy; Harris, Marilyn D; Hiong, Fong Yoke

    2017-10-01

    Throughout the world, healthcare is increasingly being provided in home and community-based settings. There is a growing awareness that the most effective, least costly, patient-preferred setting is patients' home. Thus, home healthcare nursing is a growing nursing specialty, requiring a unique set of nursing knowledge and skills. Unlike many other nursing specialties, home healthcare nursing has few professional organizations to develop or support its practice. This article describes how an international network of home healthcare nurses developed international guidelines for home healthcare nurses throughout the world. It outlines how the guidelines for home healthcare nursing practice were developed, how an international panel of reviewers was recruited, and the process they used for reaching a consensus. It also describes the plan for nurses to contribute to future updates to the guidelines.

  18. 'Present nuclear emergency responses in India: tracing requirements and guidelines suggested after Fukushima accident in regards to public and plant safety

    International Nuclear Information System (INIS)

    Jawale, Priyanka M.

    2014-01-01

    In this poster the primary initiative is to educate the public at large and instill confidence about the present Emergency Response Systems of DAE and the imminent agencies in India. Poster attempts to analyse present regulatory and safety systems, mechanisms like plant and site emergency response plans are in place to handle radiation emergencies and how public will not be affected in any manner. In India also we needed some supplementary provisions to cope up with major disasters in Nuclear Power Plants (NPP) apart from the existing one. Some of the NPPs are not under the UN safeguards, which can not import Uranium also need extra care and protection. Regulatory and safety functions of Atomic Energy in India are carried out by the Atomic Energy Regulatory Board (Atomic Energy Regulatory Board), the poster attempts to explain the present regulatory and safety mechanism under Atomic Energy Regulatory Board. We have the plant and site emergency response plans in place. The well planned functioning of these is demonstrated here. India is equipped with detail plans of emergency response system, to handle the radiation emergencies in public domain even at the locations where DAE facility is not available

  19. Energy Design Guidelines for High Performance Schools: Arctic and Subarctic Climates

    Energy Technology Data Exchange (ETDEWEB)

    2004-11-01

    The Energy Design Guidelines for High Performance Schools--Arctic and Subarctic Climates provides school boards, administrators, and design staff with guidance to help them make informed decisions about energy and environmental issues important to school systems and communities. These design guidelines outline high performance principles for the new or retrofit design of your K-12 school in arctic and subarctic climates. By incorporating energy improvements into their construction or renovation plans, schools can significantly reduce energy consumption and costs.

  20. Radiotherapy facilities: Master planning and concept design considerations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-08-15

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology, a typical project work plan and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals.

  1. Radiotherapy facilities: Master planning and concept design considerations

    International Nuclear Information System (INIS)

    2014-01-01

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology, a typical project work plan and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals

  2. PPR: a database for radiologic protection plan elaboration

    International Nuclear Information System (INIS)

    Goncalves, M.; Farias, J.T. de; Batista, D.V.

    2001-01-01

    The Plan of Radiation Protection is a document demanded for Licensing of the Radioactive Installations. It establishes the system of Radioprotection to be implemented by the Service of Radiation Protection. Its main objective is to achieve the requirements of Radiation Protection and Safety constants in the regulations CNEN-NE-3.01 - Basic Guidelines of Radiation Protection and CNEN-NE-3.06 - Requirements of Radiation Protection and Safety for Services of Radiotherapy. The proposal presented here has the aim to easy the development and the uniformity of the elaboration of the Plan of Radiation Protection. Considering the difficulties found by the physicists responsible for the services in developing a Plan of Radiation Protection that contemplate all the necessary requirements, as well as the final analysis accomplished by CNEN, the present project was elaborated. This consists of a software of easy use, developed according to the most modern patterns of programming, allowing to the user to elaborate the Plan of Radiation Protection in agreement with to basic needs of the Installation. Soon the software will be available in the page web of CNEN for download. (author)

  3. Preservation of information about the repository for spent nuclear fuels - proposal for action plan; Bevarande av information om slutfoervar foer anvaent kaernbraensle - foerslag till handlingsplan

    Energy Technology Data Exchange (ETDEWEB)

    Bowen-Schrire, Monica; Eckerhall, Daniel; Jander, Hans; Waniewska, Katarina (Vattenfall Power Consultant AB, Stockholm (Sweden))

    2008-10-15

    This report is a proposal for an action plan with the ultimate aim of ensuring that information about the repository for spent nuclear fuel can be preserved and transferred for future generations. The purpose of the proposal for an action plan is to present ideas on tangible measures and guidelines for information preservation and transfer, in the short and long term. The report deals with a number of aspects relating to information preservation as well as risks that can lead to the loss of important information. The proposal for an action plan is based on reasoning about these subjects. The main emphasis is on measures that need to be implemented in the near future to ensure that successive and direct information transfer is handled in a suitable manner. It is suggested that the following measures should be implemented within a five-year period: - Designate a person responsible for information preservation. - Work out guidelines for information preservation and transfer. - Form a network with other organizations in Sweden. - Initiate a dialogue with other countries, especially USA and France. - Participate in seminars, conferences and workgroups on an international level within the IAEA and NEA. In a longer time perspective the following measures should also be implemented: - Implement guidelines for information preservation and transfer. - Document the archiving system. - Establish a communication plan. - Archive information about the repository. - Keep the action plan up to date

  4. [Methodology report of the 2017 guidelines on fibromyalgia syndrome].

    Science.gov (United States)

    Häuser, W; Nothacker, M

    2017-06-01

    The regular update of the guidelines on fibromyalgia syndrome, AWMF number 145/004, was planned for April 2017. The guidelines were developed by 13 scientific societies and 2 patient self-help organizations coordinated by the German Pain Society. Working groups (n = 8) with a total of 42 members were formed balanced with respect to gender, medical expertise, position in the medical or scientific hierarchy and potential conflicts of interest. A systematic search of the literature from December 2010 to May 2016 was performed in the Cochrane library, MEDLINE, PsycINFO and Scopus databases. Levels of evidence were assigned according to the classification system of the Oxford Centre for Evidence-Based Medicine version 2009. The strength of recommendations was achieved by multiple step formalized procedures to reach a consensus. Efficacy, risks, patient preferences and applicability of therapies available were weighed up against each other. The guidelines were reviewed and approved by the board of directors of the societies engaged in the development of the guidelines. The guidelines are published in several forms, i.e. complete and short scientific versions and clinical practice and patient versions.

  5. Biological and chemical terrorism: strategic plan for preparedness and response. Recommendations of the CDC Strategic Planning Workgroup.

    Science.gov (United States)

    2000-04-21

    The U.S. national civilian vulnerability to the deliberate use of biological and chemical agents has been highlighted by recognition of substantial biological weapons development programs and arsenals in foreign countries, attempts to acquire or possess biological agents by militants, and high-profile terrorist attacks. Evaluation of this vulnerability has focused on the role public health will have detecting and managing the probable covert biological terrorist incident with the realization that the U.S. local, state, and federal infrastructure is already strained as a result of other important public health problems. In partnership with representatives for local and state health departments, other federal agencies, and medical and public health professional associations, CDC has developed a strategic plan to address the deliberate dissemination of biological or chemical agents. The plan contains recommendations to reduce U.S. vulnerability to biological and chemical terrorism--preparedness planning, detection and surveillance, laboratory analysis, emergency response, and communication systems. Training and research are integral components for achieving these recommendations. Success of the plan hinges on strengthening the relationships between medical and public health professionals and on building new partnerships with emergency management, the military, and law enforcement professionals.

  6. Pediatric Sepsis Guidelines: Summary for resource-limited countries

    Science.gov (United States)

    Khilnani, Praveen; Singhi, Sunit; Lodha, Rakesh; Santhanam, Indumathi; Sachdev, Anil; Chugh, Krishan; Jaishree, M.; Ranjit, Suchitra; Ramachandran, Bala; Ali, Uma; Udani, Soonu; Uttam, Rajiv; Deopujari, Satish

    2010-01-01

    Justification: Pediatric sepsis is a commonly encountered global issue. Existing guidelines for sepsis seem to be applicable to the developed countries, and only few articles are published regarding application of these guidelines in the developing countries, especially in resource-limited countries such as India and Africa. Process: An expert representative panel drawn from all over India, under aegis of Intensive Care Chapter of Indian Academy of Pediatrics (IAP) met to discuss and draw guidelines for clinical practice and feasibility of delivery of care in the early hours in pediatric patient with sepsis, keeping in view unique patient population and limited availability of equipment and resources. Discussion included issues such as sepsis definitions, rapid cardiopulmonary assessment, feasibility of early aggressive fluid therapy, inotropic support, corticosteriod therapy, early endotracheal intubation and use of positive end expiratory pressure/mechanical ventilation, initial empirical antibiotic therapy, glycemic control, and role of immunoglobulin, blood, and blood products. Objective: To achieve a reasonable evidence-based consensus on the basis of published literature and expert opinion to formulating clinical practice guidelines applicable to resource-limited countries such as India. Recommendations: Pediatric sepsis guidelines are presented in text and flow chart format keeping resource limitations in mind for countries such as India and Africa. Levels of evidence are indicated wherever applicable. It is anticipated that once the guidelines are used and outcomes data evaluated, further modifications will be necessary. It is planned to periodically review and revise these guidelines every 3–5 years as new body of evidence accumulates. PMID:20606908

  7. BWR water chemistry guidelines and PWR primary water chemistry guidelines in Japan – Purpose and technical background

    Energy Technology Data Exchange (ETDEWEB)

    Kawamura, Hirotaka, E-mail: kawamuh@criepi.denken.or.jp [Central Research Institute of Electric Power Industry (Japan); Hirano, Hideo [Central Research Institute of Electric Power Industry (Japan); Katsumura, Yousuke [University of Tokyo (Japan); Uchida, Shunsuke [Tohoku University (Japan); Mizuno, Takayuki [Mie University (Japan); Kitajima, Hideaki; Tsuzuki, Yasuo [Japan Nuclear Safety Institute (Japan); Terachi, Takumi [Institute of Nuclear Safety System, Inc. (Japan); Nagase, Makoto; Usui, Naoshi [Hitachi-GE Nuclear Energy, Ltd. (Japan); Takagi, Junichi; Urata, Hidehiro [Toshiba Corporation (Japan); Shoda, Yasuhiko; Nishimura, Takao [Mitsubishi Heavy Industry, Ltd. (Japan)

    2016-12-01

    Highlights: • Framework of BWR/PWR water chemistry Guidelines in Japan are presented. • Guideline necessity, definitions, philosophy and technical background are mentioned. • Some guideline settings for control parameters and recommendations are explaines. • Chemistry strategy is also mentioned. - Abstract: After 40 years of light water reactor (LWR) operations in Japan, the sustainable development of water chemistry technologies has aimed to ensure the highest coolant system component integrity and fuel reliability performance for maintaining LWRs in the world; additionally, it aimed to achieve an excellent dose rate reduction. Although reasonable control and diagnostic parameters are utilized by each boiling water reactor (BWR) and pressurized water reactor (PWR) owner, it is recognized that specific values are not shared among everyone involved. To ensure the reliability of BWR and PWR operation and maintenance, relevant members of the Atomic Energy Society of Japan (AESJ) decided to establish guidelines for water chemistry. The Japanese BWR and PWR water chemistry guidelines provide strategies to improve material and fuel reliability performance as well as to reduce dosing rates. The guidelines also provide reasonable “control values”, “diagnostic values” and “action levels” for multiple parameters, and they stipulate responses when these levels are exceeded. Specifically, “conditioning parameters” are adopted in the Japanese PWR primary water chemistry guidelines. Good practices for operational conditions are also discussed with reference to long-term experience. This paper presents the purpose, technical background and framework of the preliminary water chemistry guidelines for Japanese BWRs and PWRs. It is expected that the guidelines will be helpful as an introduction to achieve safety and reliability during operations.

  8. How do SAGES members rate its guidelines?

    Science.gov (United States)

    Hope, William W; Richardson, William; Fanelli, Robert; Stefanidis, Dimitrios

    2014-04-01

    The development of practice guidelines should take into consideration the opinions of end users. The Society of American Gastrointestinal and Endoscopic Surgeons (SAGES) has implemented several changes in its guideline development and dissemination process based on previous end-user input. An anonymous electronic survey was conducted via e-mail solicitation in September 2011. Respondents were asked to submit their feedback on the 26 guidelines produced by our society using a 32-item questionnaire and to suggest topics for new guideline development and areas of improvement. Responses from the survey were received by 494 people, of whom 474 (96 %) were clinicians; 373 (75 %) were general, laparoscopic, or bariatric surgeons; and 324 (65 %) held leadership roles within their institution. Most respondents were 35-44 years old (36 %), male (83 %), and had been in practice for over 10 years (54 %). A total of 383 (81 %) had used our guidelines, and, of those, 96 % agreed with their content. Guideline quality was rated 4.34; value 4.27; and ease of access 3.97 on a five-point Likert scale. The most commonly referenced guideline in the survey regarded surgical treatment of reflux (67 %), followed by laparoscopy during pregnancy (51 %). The three most common reasons guidelines were accessed were to update knowledge (68 %), to maximize patient care through evidence-based treatment (51 %), and to obtain a critical literature review. The majority of respondents indicated they greatly value and agree with our guidelines. These results indicate that recent efforts to improve our guidelines have succeeded.

  9. Lessons learned from the second Federal Radiology Emergency Response Plan Field Exercise (FFE-2)

    International Nuclear Information System (INIS)

    Adler, M.V.; Gant, K.S.; Weiss, B.H.; Wolff, W.F.; Adler, V.

    1988-01-01

    The FFE-2, held in 1987 at the Zion Nuclear Power Station, provided a large-scale, multiagency, field test of the Federal Radiological Emergency Response Plan (FRERP). The FRERP provided workable guidance for coordinating the federal response efforts and effectively supplementing the states' resources. Needs for more training for responders and clarification in portions of the response were identified

  10. 40 CFR 256.03 - State plan submission, adoption, and revision.

    Science.gov (United States)

    2010-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements, Definitions § 256.03 State plan submission, adoption, and revision. (a) To be...

  11. Application of Group-Level Item Response Models in the Evaluation of Consumer Reports about Health Plan Quality

    Science.gov (United States)

    Reise, Steven P.; Meijer, Rob R.; Ainsworth, Andrew T.; Morales, Leo S.; Hays, Ron D.

    2006-01-01

    Group-level parametric and non-parametric item response theory models were applied to the Consumer Assessment of Healthcare Providers and Systems (CAHPS[R]) 2.0 core items in a sample of 35,572 Medicaid recipients nested within 131 health plans. Results indicated that CAHPS responses are dominated by within health plan variation, and only weakly…

  12. The response to a worst-case scenario - the national emergency plan for nuclear accidents

    Energy Technology Data Exchange (ETDEWEB)

    Cunningham D, John [Radiological Protection Inst. of Ireland (Ireland)

    1996-10-01

    The Chernobyl accident in 1986 highlighted many deficiencies in the preparedness of countries to deal with a major accident. It demonstrated how vulnerable countries are to transboundary contamination. Ireland had no emergency plan at the time of the accident and only minimal facilities with which to assess the consequences of the accident. Nonetheless, the then Nuclear Energy Board with the assistance of Government Departments and the Civil Defence organisation reacted quickly to assess the situation despite the complete lack of information about the accident from the then USSR. Even countries with advanced nuclear technologies faced similar difficulties. It was quickly recognised by Government that the national laboratory facilities were totally inadequate. The Nuclear Energy Board was provided with additional resources to assist it to cope in the short term with the very large demand for monitoring. In the longer term a new national radiation laboratory was provided and the Board was formally replaced by the Radiological Protection Institute of Ireland. It was given statutory responsibility to monitor radiation levels, to advise measures to be taken for the protection of the public and to provide information for the public. An emergency plan based on the Chernobyl experience was drafted in 1987, amended and published in 1992. Certain features of this plan were implemented from 1987 onwards, notably the classification of responsibilities and the installation of a national continuous radiation monitoring system. The paper outlines the responsibilities of those who could be involved in a response to a nuclear incident, the procedures used to evaluate its consequences and the provision of information for the public. The plan provides an integrated management system which has sufficient flexibility to enable a rapid response to be made to a major or minor crisis, either foreseen or unforeseen and whatever its cause.

  13. Adherence to management guidelines for childhood asthma in Australia.

    Science.gov (United States)

    Bereznicki, Bonnie J; Beggs, Sean; Duff, Caitlin; Bereznicki, Luke

    2015-12-01

    Little is known about doctors' treatment preferences for childhood asthma. The aim of this study was to investigate adherence to management guidelines for childhood asthma. One thousand general practitioners (GPs) and paediatric specialists in Australia were invited to take part in a survey, which collected demographic details and explored their familiarity with and adherence to childhood asthma management guidelines. Two hundred doctors (20% response rate) responded and were eligible for inclusion in the survey. Approximately half (54.5%) of the respondents were very familiar with at least one of the childhood asthma management guidelines. The majority of respondents (86.8%) followed guideline recommendations when prescribing initial maintenance therapy for childhood asthma, while 89.2% and 68.0% followed guideline recommendations regarding step-up and step-down therapy respectively. Overall familiarity with childhood asthma management guidelines could be improved. There is scope for improvement in the adherence to these guidelines when prescribing medication in childhood asthma, particularly for step-down therapy.

  14. Guidelines to restoring structural integrity of covered bridge members

    Science.gov (United States)

    Ronald W. Anthony

    2018-01-01

    These guidelines are designed for decision makers (selectmen, county commissioners, city planners, preservation officers, etc.) that have responsibility for repairing and maintaining existing covered bridges to help them understand what goes into making effective decisions about how, and when, to repair a covered bridge. The purpose of these guidelines is to present...

  15. International variation in adherence to referral guidelines for suspected cancer: a secondary analysis of survey data.

    Science.gov (United States)

    Nicholson, Brian D; Mant, David; Neal, Richard D; Hart, Nigel; Hamilton, Willie; Shinkins, Bethany; Rubin, Greg; Rose, Peter W

    2016-02-01

    Variation in cancer survival persists between comparable nations and appears to be due, in part, to primary care practitioners (PCPs) having different thresholds for acting definitively in response to cancer-related symptoms. To explore whether cancer guidelines, and adherence to them, differ between jurisdictions and impacts on PCPs' propensity to take definitive action on cancer-related symptoms. A secondary analysis of survey data from six countries (10 jurisdictions) participating in the International Cancer Benchmarking Partnership. PCPs' responses to five clinical vignettes presenting symptoms and signs of lung (n = 2), colorectal (n = 2), and ovarian cancer (n = 1) were compared with investigation and referral recommendations in cancer guidelines. Nine jurisdictions had guidelines covering the two colorectal vignettes. For the lung vignettes, although eight jurisdictions had guidelines for the first, the second was covered by a Swedish guideline alone. Only the UK and Denmark had an ovarian cancer guideline. Survey responses of 2795 PCPs (crude response rate: 12%) were analysed. Guideline adherence ranged from 20-82%. UK adherence was lower than other jurisdictions for the lung vignette covered by the guidance (47% versus 58%; P nations and poor guideline adherence does not explain differential survival. Guidelines that fail to cover high-risk presentations or that recommend non-definitive action may reduce definitive diagnostic action. © British Journal of General Practice 2016.

  16. International Continence Society supported pelvic physiotherapy education guideline.

    Science.gov (United States)

    Bakker, Els; Shelly, Beth; Esch, Fetske H; Frawley, Helena; McClurg, Doreen; Meyers, Peter

    2018-02-01

    To provide a guideline of desired knowledge, clinical skills and education levels in Pelvic Physiotherapy (PT). Physiotherapy (PT) involves "using knowledge and skills unique to physiotherapists" and, "is the service only provided by, or under the direction and supervision of a physiotherapist." 1 METHODS: The PT Committee, within the body of the International Continence Society (ICS), collected information regarding existing educational levels for pelvic floor PT. Through face to face and on on-line discussion consensus was reached which was summarized in three progressive educational levels based on knowledge and skills and brought together in a guideline. The guideline was submitted to all physiotherapists and the Educational Committee of the ICS, and after approval, submitted to the Executive Board of the ICS. The guideline lists, in a progressive way, knowledge areas and skills to be achieved by education. It is broad and allows for individual interpretation based on local situations regarding education and healthcare possibilities. It is intended to be dynamic and updated on a regular basis. The proposed Pelvic PT education guideline is a dynamic document that allows course creators to plan topics for continuing course work and to recognize educational level of a therapist in the field of Pelvic PT. This education guideline can be used to set minimum worldwide standards resulting in higher skill levels for local pelvic physiotherapists and thereby better patient care outcome. © 2018 Wiley Periodicals, Inc.

  17. Clinical Practice Guidelines for Irritable Bowel Syndrome in Korea, 2017 Revised Edition

    Science.gov (United States)

    Song, Kyung Ho; Jung, Hye-Kyung; Kim, Hyun Jin; Koo, Hoon Sup; Kwon, Yong Hwan; Shin, Hyun Duk; Lim, Hyun Chul; Shin, Jeong Eun; Kim, Sung Eun; Cho, Dae Hyeon; Kim, Jeong Hwan; Kim, Hyun Jung

    2018-01-01

    In 2011, the Korean Society of Neurogastroenterology and Motility (KSNM) published clinical practice guidelines on the management of irritable bowel syndrome (IBS) based on a systematic review of the literature. The KSNM planned to update the clinical practice guidelines to support primary physicians, reduce the socioeconomic burden of IBS, and reflect advances in the pathophysiology and management of IBS. The present revised version of the guidelines is in continuity with the previous version and targets adults diagnosed with, or suspected to have, IBS. A librarian created a literature search query, and a systematic review was conducted to identify candidate guidelines. Feasible documents were verified based on predetermined inclusion and exclusion criteria. The candidate seed guidelines were fully evaluated by the Guidelines Development Committee using the Appraisal of Guidelines for Research and Evaluation II quality assessment tool. After selecting 7 seed guidelines, the committee prepared evidence summaries to generate data exaction tables. These summaries comprised the 4 main themes of this version of the guidelines: colonoscopy; a diet low in fermentable oligosaccharides, disaccharides, monosaccharides, and polyols; probiotics; and rifaximin. To adopt the core recommendations of the guidelines, the Delphi technique (ie, a panel of experts on IBS) was used. To enhance dissemination of the clinical practice guidelines, a Korean version will be made available, and a food calendar for patients with IBS is produced. PMID:29605976

  18. Siting guidelines and their role in repository site selection

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1985-01-01

    The first requirement of the Nuclear Waste Policy Act was for the Secretary of Energy to issue general guidelines for siting repositories. The guidelines were to specify detailed geologic considerations that would be the primary criteria for the selection of sites in various host rocks, as well as factors that would qualify or disqualify any site from development as a repository. These guidelines were clearly intended to provide not only the framework for the siting program but also the stimulus for establishing effective communication and consultation among the parties involved in the program. The Act further required that the guidelines be a factor in the development of all future decision documents of the Office of Civilian Radioactive Waste Management, including the environmental assessments that would accompany the nomination of sites for characterization, the site-characterization plans that are to be prepared before the sinking of exploratory shafts at any candidate site, and the environmental impact statement that is to support the recommendation of a site for development as a repository. More than two years after its passage, the intention of the Act for the guidelines has been realized. Concurred in by the Nuclear Regulatory Commission on June 22, 1984, and issued by the Department in November 1984, the guidelines include postclosure technical guidelines that apply to conditions governing the long-term performance of the repository system; preclosure technical guidelines that apply to conditions governing the siting, construction, operation, and closure of the repository; and system guidelines whose objective is to ensure that the regulatory requirements of the Environmental Protection Agency and the Nuclear Regulatory Commission are met

  19. Inter-Organisational Systems, Strategy and Structure: the case for planning environments

    Directory of Open Access Journals (Sweden)

    Pat Finnegan

    1998-11-01

    Full Text Available Electronic trade and commerce have brought inter organisational co-operation to the forefront of organisational strategies. However, inter-organisational systems (IOS planning lacks appropriate methodological guidelines, and tends to be practised in an insular manner. This paper examines the development of systems in three interorganisational networks in Ireland in order to ascertain the planning that went into them. The networks studied are representative of three types of structural interdependencies - pooled, reciprocal and sequential. Although it is difficult to identify an activity that can be clearly labelled IOS planning, planning is integral to the development of all networks. The interdependencies influence planning processes and outcomes. For the pooled and reciprocal networks, the planning process gives a focus. For the sequential network, the main planning is done by the hub organisation, and extended to the spokes. Planning interactions across all networks illustrate similarities that reveal that existence of planning environments within which IOS planning takes place. These planning environments are proposed as being an appropriate basis for the development of IOS planning guidelines.

  20. Emergency response guide-B ECCS guideline evaluation analyses for N reactor

    International Nuclear Information System (INIS)

    Chapman, J.C.; Callow, R.A.

    1989-07-01

    INEL conducted two ECCS analyses for Westinghouse Hanford. Both analyses will assist in the evaluation of proposed changes to the N Reactor Emergency Response Guide-B (ERG-B) Emergency Core System (ECCS) guideline. The analyses were a sensitivity study for reduced-ECCS flow rates and a mechanistically determined confinement steam source for a delayed-ECCS LOCA sequence. The reduced-ECCS sensitivity study established the maximum allowable reduction in ECCS flow as a function of time after core refill for a large break loss-of-coolant accident (LOCA) sequence in the N Reactor. The maximum allowable ECCS flow reduction is defined as the maximum flow reduction for which ECCS continues to provide adequate core cooling. The delayed-ECCS analysis established the liquid and steam break flows and enthalpies during the reflood of a hot core following a delayed ECCS injection LOCA sequence. A simulation of a large, hot leg manifold break with a seven-minute ECCS injection delay was used as a representative LOCA sequence. Both analyses were perform using the RELAP5/MOD2.5 transient computer code. 13 refs., 17 figs., 3 tabs

  1. Public comments and responses to the 1989 Hanford cleanup five-year plan

    International Nuclear Information System (INIS)

    1991-06-01

    In April 1990 the US Department of Energy (DOE) issued a site- specific Five-Year Plan (DOE-RL 1989a) on Hanford's cleanup for public review and comment. The plan guides Hanford in carrying out DOE's national plan for environmental restoration and waste management. During the 90-day public comment period, DOE held nine public meetings to answer questions and gather comments on the plan. This report is in three main sections. The first presents consolidated public comments and responses. These were compiled from both verbal comments from public meetings and written comments. The second section contains comments not responded to in this plan. Those comments were outside this plan's scope, related to how we gathered public comments, or intended for and directed to DOE-Headquarters. In the appendixes are the written comment letters we received and a short glossary and list of special terms we use. The source of comments is shown in parentheses after the comment. The individual who made the comment, the city of the public meeting, or the organization name is generally used. When several sources gave the same comment, a source was not listed. 26 refs

  2. Biomedical programs operations plans

    Science.gov (United States)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  3. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  4. Digital marketing plan for a news agency

    OpenAIRE

    Do, Thi Minh Chau

    2013-01-01

    In the business world, an effective marketing plan is an important guideline for any company, regardless of how small or big the business scale is, to stay focused to their goals. Moreover, "the written marketing plan gives a common direction to all staff in the company" (McKinlay & O'Connor, 2007). Therefore, formulating a marketing plan prior to utilizing any marketing actions is substantial and necessary. However, producing a marketing plan requires knowledge of marketing. For those re...

  5. Interagency Communication and Collaboration on School Crisis Response Planning and Management

    Science.gov (United States)

    Skavdahl, Britta M.

    2010-01-01

    Purpose. The purpose of this study was to determine what research-based and federally recommended practices in the area of school crisis response planning and management were being implemented in K-8 school districts in Northern California, as well as the degree with which the recommended practices were being implemented. Finally, the study…

  6. Guidelines for the use of biological monitors in air pollution control (plants). Pt. 1. Methodological guidance for the drawing-up of biomonitoring guidelines (plants)

    Energy Technology Data Exchange (ETDEWEB)

    Zimmermann, R.D. [Buero fuer Konzeptionelle Bioindikation, Jockgrim (Germany); Wagner, G. [Universitaet des Saarlandes, Saarbruecken (Germany). Inst. fuer Biogeographie; Finck, M.

    2000-04-01

    The main objective of this study is to encourage and promote further development of the methodological basis for a broader and more effective use of biological methods for monitoring the effects of air pollution on plants. It is not intended here to explain or discuss general criteria for the design of environmental monitoring studies and principal statistical methods for dealing with heterogeneously distributed spatial phenomena in detail. A further objective of this study is to give general guidance on how to - select suitable bioindicators, - develop, optimise and validate specific guidelines for the use of these bioindicators, - plan, design and employ biomonitoring studies for different purposes, - develop case-specific study plans determining how to apply an appropriate bioindicator (method-specific guideline) to a given task, case and area, - adapt principles of quality assurance and quality control to biomonitoring studies, - increase the importance and reliability of results obtained by bioindicators with respect to administrative measures. (orig.)

  7. Development of Consensus Treatment Plans for Juvenile Localized Scleroderma

    Science.gov (United States)

    Li, Suzanne C.; Torok, Kathryn S.; Pope, Elena; Dedeoglu, Fatma; Hong, Sandy; Jacobe, Heidi T.; Rabinovich, C. Egla; Laxer, Ronald M.; Higgins, Gloria C.; Ferguson, Polly J.; Lasky, Andrew; Baszis, Kevin; Becker, Mara; Campillo, Sarah; Cartwright, Victoria; Cidon, Michael; Inman, Christi J; Jerath, Rita; O'Neil, Kathleen M.; Vora, Sheetal; Zeft, Andrew; Wallace, Carol A.; Ilowite, Norman T.; Fuhlbrigge, Robert C

    2013-01-01

    Objective To develop standardized treatment plans, clinical assessments, and response criteria for active, moderate to high severity juvenile localized scleroderma (jLS). Background jLS is a chronic inflammatory skin disorder associated with substantial morbidity and disability. Although a wide range of therapeutic strategies have been reported in the literature, a lack of agreement on treatment specifics and accepted methods for clinical assessment of have made it difficult to compare approaches and identify optimal therapy. Methods A core group of pediatric rheumatologists, dermatologists and a lay advisor was engaged by the Childhood Arthritis and Rheumatology Research Alliance (CARRA) to develop standardized treatment plans and assessment parameters for jLS using consensus methods/nominal group techniques. Recommendations were validated in two face-to-face conferences with a larger group of practitioners with expertise in jLS and with the full membership of CARRA, which encompasses the majority of pediatric rheumatologists in the U.S and Canada. Results Consensus was achieved on standardized treatment plans that reflect the prevailing treatment practices of CARRA members. Standardized clinical assessment methods and provisional treatment response criteria were also developed. Greater than 90% of pediatric rheumatologists responding to a survey (67% of CARRA membership) affirmed the final recommendations and agreed to utilize these consensus plans to treat patients with jLS. Conclusions Using consensus methodology, we have developed standardized treatment plans and assessment methods for jLS. The high level of support among pediatric rheumatologists will support future comparative effectiveness studies and enable the development of evidence-based guidelines for the treatment of jLS. PMID:22505322

  8. Application of The APA Practice Guidelines on Suicide to Clinical Practice.

    Science.gov (United States)

    Jacobs, Douglas G; Brewer, Margaret L

    2006-06-01

    This article presents charts from The American Psychiatric Association Practice Guideline for the Assessment and Treatment of Patients with Suicidal Behaviors, part of the Practice Guidelines for the Treatment of Psychiatric Disorders Compendium, and a summary of the assessment information in a format that can be used in routine clinical practice. Four steps in the assessment process are presented: the use of a thorough psychiatric examination to obtain information about the patient's current presentation, history, diagnosis, and to recognize suicide risk factors therein; the necessity of asking very specific questions about suicidal ideation, intent, plans, and attempts; the process of making an estimation of the patient's level of suicide risk is explained; and the use of modifiable risk and protective factors as the basis for treatment planning is demonstrated. Case reports are used to clarify use of each step in this process.

  9. Planning and preparing for emergency response to transport accidents involving radioactive material. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    The objective of this Safety Guide is to provide guidance to the public authorities and others (including consignors, carriers and emergency response authorities) who are responsible for developing and establishing emergency arrangements for dealing effectively and safely with transport accidents involving radioactive material. It may assist those concerned with establishing the capability to respond to such transport emergencies. It provides guidance for those Member States whose involvement with radioactive material is just beginning. It also provides guidance for those Member States that have already developed their radioactive material industries and the attendant emergency plans but that may need to review and improve these plans

  10. 77 FR 43350 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the San Diego Unified...

    Science.gov (United States)

    2012-07-24

    ... impacts, as described in the applicant's habitat conservation plan (plan). We request data, comments, and..., the Carroll Canyon Preserve on the east and south, and aggregate mining operations on the west. The... compliance with all applicable California Department of Education School Development Guidelines (guidelines...

  11. Application of Real-Time Automated Traffic Incident Response Plan Management System: A Web Structure for the Regional Highway Network in China

    Directory of Open Access Journals (Sweden)

    Yongfeng Ma

    2014-01-01

    Full Text Available Traffic incidents, caused by various factors, may lead to heavy traffic delay and be harmful to traffic capacity of downstream sections. Traffic incident management (TIM systems have been developed widely to respond to traffic incidents intelligently and reduce the losses. Traffic incident response plans, as an important component of TIM, can effectively guide responders as to what and how to do in traffic incidents. In the paper, a real-time automated traffic incident response plan management system was developed, which could generate and manage traffic incident response plans timely and automatically. A web application structure and a physical structure were designed to implement and show these functions. A standard framework of data storage was also developed to save information about traffic incidents and generated response plans. Furthermore, a conformation survey and case-based reasoning (CBR were introduced to identify traffic incident and generate traffic incident response plans automatically, respectively. Twenty-three traffic crash-related incidents were selected and three indicators were used to measure the system performance. Results showed that 20 of 23 cases could be retrieved effectively and accurately. The system is practicable to generate traffic incident response plans and has been implemented in China.

  12. Planning and Preparation for CD-ROM Implementation: The Citadel Library.

    Science.gov (United States)

    Maynard, J. Edmund

    Management guidelines for library planning and a strategic planning program profile based on the literature were used in the planning process for implementing access to databases on CD-ROM at the Daniel Library of the Citadel, Military College of South Carolina. According to this model, the planning process would consist of five stages: (1)…

  13. Basic Concepts Required in the Development of a Planning Information System.

    Science.gov (United States)

    Kennedy, F. D.

    This report, the result of developmental research on a planning information system for North Carolina, describes the planning process at higher levels of State government, defines a general information system and derives a planning information system from various types of planning, provides guidelines for system design and evaluation, and…

  14. Steam Generator Owners Group PWR secondary water chemistry guidelines

    International Nuclear Information System (INIS)

    Welty, C.S. Jr.; Green, S.J.

    1985-01-01

    In 1981 the Steam Generator Owners Group (SGOG), a group of domestic and foreign pressurized water reactor (PWR) owners, developed and issued the PWR secondary water chemistry guidelines. The guidelines were prepared in response to the growing recognition that a majority of the problems causing reduced steam generator reliability (e.g., denting, wasteage, pitting, etc.) were related to secondary (steam) side water purity. The guidelines were subsequently issued as an Electric Power Research Institute (EPRI) report. In 1984 they were revised to reflect industry experience in adopting the original issuance and to incorporate new information on causes of corrosion damage. The guidelines have been endorsed and their adoption recommended by the SGOG

  15. International variation in adherence to referral guidelines for suspected cancer: a secondary analysis of survey data

    Science.gov (United States)

    Nicholson, Brian D; Mant, David; Neal, Richard D; Hart, Nigel; Hamilton, Willie; Shinkins, Bethany; Rubin, Greg; Rose, Peter W

    2016-01-01

    Background Variation in cancer survival persists between comparable nations and appears to be due, in part, to primary care practitioners (PCPs) having different thresholds for acting definitively in response to cancer-related symptoms. Aim To explore whether cancer guidelines, and adherence to them, differ between jurisdictions and impacts on PCPs’ propensity to take definitive action on cancer-related symptoms. Design and setting A secondary analysis of survey data from six countries (10 jurisdictions) participating in the International Cancer Benchmarking Partnership. Method PCPs’ responses to five clinical vignettes presenting symptoms and signs of lung (n = 2), colorectal (n = 2), and ovarian cancer (n = 1) were compared with investigation and referral recommendations in cancer guidelines. Results Nine jurisdictions had guidelines covering the two colorectal vignettes. For the lung vignettes, although eight jurisdictions had guidelines for the first, the second was covered by a Swedish guideline alone. Only the UK and Denmark had an ovarian cancer guideline. Survey responses of 2795 PCPs (crude response rate: 12%) were analysed. Guideline adherence ranged from 20–82%. UK adherence was lower than other jurisdictions for the lung vignette covered by the guidance (47% versus 58%; P <0.01) but similar (45% versus 46%) or higher (67% versus 38%; P <0.01) for the two colorectal vignettes. PCPs took definitive action least often when a guideline recommended a non-definitive action or made no recommendation. UK PCPs adhered to recommendations for definitive action less than their counterparts (P <0.01). There wasno association between jurisdictional guideline adherence and 1-year survival. Conclusion Cancer guideline content is variable between similarly developed nations and poor guideline adherence does not explain differential survival. Guidelines that fail to cover high-risk presentations or that recommend non-definitive action may reduce definitive

  16. Assessment of emergency response planning and implementation in the aftermath of major natural disasters and technological accidents

    International Nuclear Information System (INIS)

    Milligan, Patricia A.; Jones, Joseph; Walton, F.; Smith, J.D.

    2008-01-01

    Emergency planning around nuclear power plants represents some of the most mature and well developed emergency planning in the United States. Since the implementation of NUREG-0654 / FEMA-REP-1, Rev. 1, A Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants (NRC, 1980a) the licensees, local, and State agencies have developed detailed Radiological Emergency Response Programs. An important component of these plans is the evacuation of the population in the event of a general emergency condition at the plant. In January 2005, the U.S. Nuclear Regulatory Commission (NRC) published the landmark report, 'Identification and Analysis of Factors Affecting Emergency Evacuations' (NUREG/CR 6864/), which represented the most comprehensive investigation of public evacuations in the United States in more than 15 years. Since the completion of this research, several high profile evacuations have occurred, including Hurricane Katrina in New Orleans, Hurricane Rita in Houston, as well as major wildfires across the western U.S. The NRC commissioned an update to its 2005 evacuation case study publication to evaluate the evacuation experience of the selected communities (e.g., timeliness, related injuries, hazard avoidance); the level of preplanning that was in place for the affected areas and extent that the pre planned requirements were implemented during the emergency response; the critical factors contributing to the efficiency of or impediments to the evacuations (e.g., training, drills, preparedness, experience, resources, facilities, and organizational structure); and additional factors that may have contributed to less than satisfactory public response (i.e., availability of personal transportation, use of public transportation, lack of availability of shelters, etc.). The comprehensive report will be published in fall of 2008 as NUREG/CR-6981, Assessment of Emergency Response Planning and

  17. Medical Guidelines Presentation and Comparing with Electronic Health Record

    Czech Academy of Sciences Publication Activity Database

    Veselý, Arnošt; Zvárová, Jana; Peleška, Jan; Buchtela, David; Anger, Z.

    2006-01-01

    Roč. 75, č. 3-4 (2006), s. 240-245 ISSN 1386-5056 R&D Projects: GA AV ČR 1ET200300413 Institutional research plan: CEZ:AV0Z10300504 Keywords : medical guidelines * electronic health record * GLIF model * reminder facility Subject RIV: IN - Informatics, Computer Science Impact factor: 1.726, year: 2006

  18. UPSAT guidelines. 1996 edition. Reference document for IAEA Uranium Productions Safety Assessment Teams (UPSATs)

    International Nuclear Information System (INIS)

    1996-05-01

    The IAEA Uranium Production Safety Assessment Team (UPSAT) programme provides advice and assistance to Member States to enhance the safety and environmental performance of uranium production facilities during construction, commissioning and operation. Sound design and construction are prerequisite for the safe and environmentally responsible operation of uranium mines and mills. However, the safety of the facility depends ultimately on sound policies, procedures and practices; on the capability and reliability of the construction, commissioning and operating personnel; on comprehensive instructions; and on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. The UPSAT guidelines have been developed in the following areas: (1) management, organization and administration; (2) training and qualification; (3) operation (4) maintenance; (5) safety, fire protection, emergency planning, and preparedness; (6) radiation protection; (7) environmental monitoring programme; (8) construction management; (9) commissioning and decommissioning

  19. Planning an Effective Child Care Center.

    Science.gov (United States)

    Wright, Rodney; Wright, Sydney

    This conference presentation offers general guidelines for planning a new child care facility. Particular attention is given to site selection, space requirements, functional requirements, materials, climate, and choosing an architect. (RH)

  20. • New guidelines for national airline caterers.

    Science.gov (United States)

    1989-06-24

    The Government is to issue new guidelines to prevent food poisoning from airline meals. The proposed action comes in response to recent survey evidence which found contaminated meals served up to passengers.

  1. Impact of target volume coverage with Radiation Therapy Oncology Group (RTOG) 98-05 guidelines for transrectal ultrasound guided permanent Iodine-125 prostate implants

    International Nuclear Information System (INIS)

    Horwitz, Eric M.; Mitra, Raj K.; Uzzo, Robert G.; Das, Indra J.; Pinover, Wayne H.; Hanlon, Alexandra L.; McNeeley, Shawn W.; Hanks, Gerald E.

    2003-01-01

    Purpose: Despite the wide use of permanent prostate implants for the treatment of early stage prostate cancer, there is no consensus for optimal pre-implant planning guidelines that results in maximal post-implant target coverage. The purpose of this study was to compare post-implant target volume coverage and dosimetry between patients treated before and after Radiation Therapy Oncology Group (RTOG) 98-05 guidelines were adopted using several dosimetric endpoints. Materials and methods: Ten consecutively treated patients before the adoption of the RTOG 98-05 planning guidelines were compared with ten consecutively treated patients after implementation of the guidelines. Pre-implant planning for patients treated pre-RTOG was based on the clinical target volume (CTV) defined by the pre-implant TRUS definition of the prostate. The CTV was expanded in each dimension according to RTOG 98-05 and defined as the planning target volume. The evaluation target volume was defined as the post-implant computed tomography definition of the prostate based on RTOG 98-05 protocol recommendations. Implant quality indicators included V 100 , V 90 , V 100 , and Coverage Index (CI). Results: The pre-RTOG median V 100 , V 90 , D 90 , and CI values were 82.8, 88.9%, 126.5 Gy, and 17.1, respectively. The median post-RTOG V 100 , V 90 , D 90 , and CI values were 96.0, 97.8%, 169.2 Gy, and 4.0, respectively. These differences were all statistically significant. Conclusions: Implementation of the RTOG 98-05 implant planning guidelines has increased coverage of the prostate by the prescription isodose lines compared with our previous technique, as indicated by post-implant dosimetry indices such as V 100 , V 90 , D 90 . The CI was also improved significantly with the protocol guidelines. Our data confirms the validity of the RTOG 98-05 implant guidelines for pre-implant planning as it relates to enlargement of the CTV to ensure adequate margin between the CTV and the prescription isodose

  2. Facility Response Plan (FRP) Inspected Points, Region 9, 2014, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — A Facility Response Plan (FRP) demonstrates a facility's preparedness to respond to a worst case oil discharge. Under the Clean Water Act, as amended by the Oil...

  3. Particular intervention plan of the Civaux Nuclear Power Plant. Public version. Special provision of the organisation plan for civil protection response

    International Nuclear Information System (INIS)

    2016-04-01

    The Particular intervention plan (PPI in French) is an emergency plan which foresees the measures and means to be implemented to address the potential risks of the presence and operation of a nuclear facility. This plan is implemented and developed by the Prefect in case of nuclear accident (or incident leading to a potential accident), the impact of which extending beyond the facility perimeter. It represents a special section of the organisation plan for civil protection response (ORSEC plan). The PPI foresees the necessary measures and means for crisis management during the first hours following the accident and is triggered by the Department Prefect according to the information provided by the facility operator. Its aim is to protect the populations leaving within 10 km of the facility against a potential radiological hazard. The PPI describes: the facility, the intervention area, the protection measures for the population, the conditions of emergency plan triggering, the crisis organisation, the action forms of the different services, and the post-accident stage. This document is the public version of the Particular intervention plan of the Civaux nuclear power plant (Vienne, France)

  4. Quality assurance in radiotherapy: Proposal of guidelines concerning clinical and technological aspects

    International Nuclear Information System (INIS)

    Group of study 'Assicurazione di qualita' in radioterapia'.

    1996-12-01

    The document, based on European guidelines, was jointly developed by radiation oncologists, radiation physicists and radiation technologists. In contains the aims of the guidelines, professional profiles, roles and responsibilities, personnel and equipment requirements, procedures

  5. Project gnome decontamination and decommissioning plan

    International Nuclear Information System (INIS)

    1979-04-01

    The document presents the operational plan for conducting the final decontamination and decommissioning work at the site of the first U.S. nuclear detonation designed specifically for peaceful purposes and the first underground event on the Plowshare Program to take place outside the Nevada Test Site. The plan includes decontamination and decommissioning procedures, radiological guidelines, and the NV concept of operations

  6. Forest planning at territory level: a methodological proposal

    Directory of Open Access Journals (Sweden)

    Agnoloni S

    2009-05-01

    Full Text Available This paper describes goals and methodologies of the Land Plan for Forest and Natural Environment Management Guidance (PFTI stemming from the Ri.Selv.Italia national project (within the “Forest Land Planning” 4.2 subproject. The PFTI geographic range of application is at an intermediate level between single forest-management-unit-level plan and regional forest plans, and deals with forest and pastures resources management. PFTI’s main purposes concern forest resource and forest economy analysis and assessment of the benefits that can be provided to local population through a rational forest management, taking into account also the social structure and potential local conflicts. PFTI’s final task is then to weigh up all these issues in order to give specific participated forest management guidelines at a territorial scale. Unlike the forest-management-unit-level plan, whose specific duties are predetermined and fixed, the PFTI is not necessarily a mandatory plan. On the opposite, PFTI should suggest several specific silviculture guidelines and alternative management scenarios.

  7. Geographic Response Information Network : a new tool to manage community information for oil spill contingency planning and response operations

    Energy Technology Data Exchange (ETDEWEB)

    Munger, M.; Bryant, T. [Cook Inlet Regional Citizen' s Advisory Council, Kenai, AK (United States); Haugstad, E.; Kwietniak, J. [Tesora Alaska Petroleum, Kenai, AK (United States); DeCola, E.; Robertson, T. [Nuka Research and Planning Group, Seldovia, AK (United States)

    2006-07-01

    This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. There are several sub-headings under each category, such as location, people, economy, subsistence and transportation. This general information allows incident management personnel to obtain a community profile to better understand the cultural, social and economic basis of the community. The GRIN prototype was developed for the Kodiak urban area, but it may be expanded in the future to include other coastal communities in Alaska. 3 refs., 6 figs.

  8. Geographic Response Information Network : a new tool to manage community information for oil spill contingency planning and response operations

    International Nuclear Information System (INIS)

    Munger, M.; Bryant, T.; Haugstad, E.; Kwietniak, J.; DeCola, E.; Robertson, T.

    2006-01-01

    This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. There are several sub-headings under each category, such as location, people, economy, subsistence and transportation. This general information allows incident management personnel to obtain a community profile to better understand the cultural, social and economic basis of the community. The GRIN prototype was developed for the Kodiak urban area, but it may be expanded in the future to include other coastal communities in Alaska. 3 refs., 6 figs

  9. Legislative framework on establishing emergency response plan in the case of a nuclear accident

    International Nuclear Information System (INIS)

    Novosel, N.; Valcic, I.; Biscan, R.

    2000-01-01

    To give an overview of the legislative framework, which defined emergency planning in Croatia in the case of a nuclear accident, it's necessary to look at all international recommendations and obligations and the national legislation, acts and regulations. It has to be emphasized that Croatia signed three international conventions in this field, and by that took over some responsibilities and obligations. Beside that, it is also in Croatian interest to follow the recommendations of international institutions such as International Atomic Energy Agency (IAEA standards and technical documents). On the other hand, national legislation in this field consists of several laws, which cover nuclear safety measures, governmental organization, natural disasters and acts (decree, decisions) of responsible authority for emergency planning in the case of a nuclear accident (Ministry of Economy). This paper presents an overview of the international and Croatian legislation which influenced the emergency planning in the case of a nuclear accident. (author)

  10. World Health Organization guideline development: an evaluation.

    Directory of Open Access Journals (Sweden)

    David Sinclair

    Full Text Available BACKGROUND: Research in 2007 showed that World Health Organization (WHO recommendations were largely based on expert opinion, rarely used systematic evidence-based methods, and did not follow the organization's own "Guidelines for Guidelines". In response, the WHO established a "Guidelines Review Committee" (GRC to implement and oversee internationally recognized standards. We examined the impact of these changes on WHO guideline documents and explored senior staff's perceptions of the new procedures. METHODS AND FINDINGS: We used the AGREE II guideline appraisal tool to appraise ten GRC-approved guidelines from nine WHO departments, and ten pre-GRC guidelines matched by department and topic. We interviewed 20 senior staff across 16 departments and analyzed the transcripts using the framework approach. Average AGREE II scores for GRC-approved guidelines were higher across all six AGREE domains compared with pre-GRC guidelines. The biggest changes were noted for "Rigour of Development" (up 37.6%, from 30.7% to 68.3% and "Editorial Independence" (up 52.7%, from 20.9% to 73.6%. Four main themes emerged from the interviews: (1 high standards were widely recognized as essential for WHO credibility, particularly with regard to conflicts of interest; (2 views were mixed on whether WHO needed a single quality assurance mechanism, with some departments purposefully bypassing the procedures; (3 staff expressed some uncertainties in applying the GRADE approach, with departmental staff concentrating on technicalities while the GRC remained concerned the underlying principles were not fully institutionalized; (4 the capacity to implement the new standards varied widely, with many departments looking to an overstretched GRC for technical support. CONCLUSIONS: Since 2007, WHO guideline development methods have become more systematic and transparent. However, some departments are bypassing the procedures, and as yet neither the GRC, nor the quality assurance

  11. January 2014 pulmonary journal club: interventional guidelines

    Directory of Open Access Journals (Sweden)

    Mathew M

    2014-01-01

    Full Text Available No abstract available. Article truncated after 150 words. A few years ago a colleague and I were discussing the shape of healthcare in the USA. One of the comments that was made was "that despite the high costs within our system, that at least there was some standardization in the treatment of certain diseases, for example, receiving Aspirin for an acute myocardial infarction". Guidelines exist to ensure that for certain conditions a standard of care is practiced. When guidelines start to become a measuring stick for what is now considered best practice…..then it our responsibility to ensure that guidelines are rooted on high quality evidence. This paper reviewed the validity of guidelines published and practiced by several of the interventional medical societies including the American Association for Bronchology and Interventional Pulmonology (AABIP, American Society of Diagnostic and Interventional Nephrology (ASDIN, American Society For Gastrointestinal Endoscopy (ASGE and the Society for Cardiovascular Angiography and Interventions (SCAI. A total of ...

  12. Antihyperlipidemic Medication Treatment Patterns and Statin Adherence Among Patients with ASCVD in a Managed Care Plan After Release of the 2013 ACC/AHA Guideline on the Treatment of Blood Cholesterol.

    Science.gov (United States)

    Bellows, Brandon K; Olsen, Cody J; Voelker, Jennifer; Wander, Curtis

    2016-08-01

    The American College of Cardiology (ACC) and American Heart Association (AHA) released a new blood cholesterol treatment guideline in November 2013. It is unknown how the new recommendations have affected cholesterol medication use and adherence in a commercial health plan. To evaluate the effect of the 2013 guideline release on antihyperlipidemic treatment patterns and statin adherence in patients with atherosclerotic cardiovascular disease (ASCVD) compared with a historical control group. This study was a historical cohort analysis of adult patients (aged 21-75 years) with clinical ASCVD enrolled in a SelectHealth commercial health plan. Patients were included in the guideline implementation cohort if they had a medical claim with an ICD-9-CM diagnosis of ASCVD in the year before the November 2013 ACC/AHA guideline release. The index date was defined as the first outpatient medical claim with an ICD-9-CM for ASCVD in the first 6 months after the guideline was released. Patients were required to have continuous enrollment for ≥ 1 year before and after the index date. These same criteria were applied to patients exactly 4 years earlier to identify a historical control group. Patients meeting these criteria formed the antihyperlipidemic treatment patterns cohort. Of these, patients who also had ≥1 pharmacy claim for a statin in the 1-year pre- and post-index periods were included in the statin adherence cohort. Antihyperlipidemic treatment patterns were assessed using pharmacy claims for antihyperlipidemic medications in the 1-year pre- and post-index periods. Antihyperlipidemic medication claims were classified as a nonstatin cholesterol medication, low-intensity statin, moderate-intensity statin, or high-intensity statin. To address differences in pre-index antihyperlipidemic medications between the guideline implementation and historical control groups, patients were randomly matched 1:1 based on pre-index classification in a post hoc analysis. Post

  13. Marine spill response planning for the non-persistent oil transportation industry in Alaska

    International Nuclear Information System (INIS)

    Taylor, E.; Egland, L.

    1998-01-01

    The unique difficulties that face oil spill response planning for the oil transportation industry in Alaska were discussed. Three levels of response strategies and actions proposed by the Alaska Petroleum Distributors and Transporters (APD and T) member companies were reviewed. They were: (1) immediate response (on-board resources), (2) in-region response (caches in Subareas), and (3) out-of-region cascaded resources (from Anchorage and other sources). The strategies and levels of capability were proposed as emergency measures in addition to the more important prevention measures already instituted to prevent discharges of non-persistent oil. 5 refs., 2 tabs., 9 figs

  14. Barriers and Enablers to Implementation of Dietary Guidelines in Early Childhood Education Centers in Australia: Application of the Theoretical Domains Framework.

    Science.gov (United States)

    Grady, Alice; Seward, Kirsty; Finch, Meghan; Fielding, Alison; Stacey, Fiona; Jones, Jannah; Wolfenden, Luke; Yoong, Sze Lin

    2018-03-01

    To identify perceived barriers and enablers to implementation of dietary guidelines reported by early childhood education center cooks, and barriers and enablers associated with greater implementation based on assessment of center menu compliance. Cross-sectional telephone interview. Early childhood education centers, New South Wales, Australia. A total of 202 cooks responsible for menu planning; 70 centers provided a menu for review of compliance with dietary guidelines. Barriers and enablers to dietary guideline implementation were determined using a tool assessing constructs of the Theoretical Domains Framework (TDF). Higher scores (≥6) for each construct indicated enablers to guideline implementation; lower scores (barriers. Multivariable linear regression identified TDF constructs associated with greater guideline implementation. Scores were lowest for reinforcement (mean, 5.85) and goals (mean, 5.89) domains, and highest for beliefs about consequences (mean, 6.51) and social/professional role and identity (mean, 6.50). The skills domain was positively associated with greater implementation of guidelines based on menu review (P = .01). Cooks perceived social/professional role and identity, and beliefs about consequences to be enablers to dietary guideline implementation; however, only the skills domain was associated with greater implementation. There are opportunities to target the incongruence in perceptions vs reality of the barriers and enablers to implementation. Future research could examine the utility of the TDF to identify barriers and enablers to implementation to inform intervention development and for evaluating interventions to examine intervention mechanisms. Copyright © 2017 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.

  15. Characteristics of Effective Collaboration in Response to Diversified Transportation Planning Authority

    Directory of Open Access Journals (Sweden)

    John S. Miller

    2011-01-01

    Full Text Available Advantages of decentralized transportation planning responsibilities may include reduced project delivery cost, the integration of comprehensive long-range planning with regional land use, and greater accountability regarding local concerns. Yet disadvantages may include a tendency for operations to dominate longer-term planning, inconsistent operational standards, and difficulty in achieving network benefits, since some transportation links may provide benefits to the entire system but not to the immediate area where the link is located. To surmount these challenges in a decentralized environment, agencies need to cooperate effectively. Characteristics of effective collaboration include (1 experienced personnel, (2 credibility of the deciding entity, (3 transparency of decision-making processes, (4 an authority with sufficient power and/or funding to encourage implementation of key initiatives, (5 clear incentives for cooperation, and, of special importance given limited resources, and (6 an ability to evaluate tradeoffs. An access management case study demonstrates how agencies may use these characteristics to advance challenging projects in a decentralized environment.

  16. Implementation of a clinical dementia guideline. A controlled study on the effect of a multifaceted strategy

    DEFF Research Database (Denmark)

    Waldorff, Frans Boch; Almind, Gert; Mäkelä, Marjukka

    2003-01-01

    OBJECTIVE: To assess the impact of a multifaceted implementation strategy aiming to improve GP adherence to a clinical guideline on dementia. DESIGN: Controlled before and after study using data records from regional laboratories. The guideline was mailed to all GPs. The multifaceted implementation...... strategy was planned with local GPs, and consisted of seminars, outreach visits, reminders and continuing medical education (CME) small group training. SETTING: Primary health care. SUBJECTS: 535 GP practices with 727 physicians in Denmark. MAIN OUTCOME MEASURES: The diffusion and use of the guideline...... of dementia in general practice. CONCLUSION: Although GPs regarded the guideline applicable in primary care, no change in practice adherence to guideline recommendations was detected after a multifaceted implementation....

  17. Developing clinical practice guidelines: target audiences, identifying topics for guidelines, guideline group composition and functioning and conflicts of interest.

    Science.gov (United States)

    Eccles, Martin P; Grimshaw, Jeremy M; Shekelle, Paul; Schünemann, Holger J; Woolf, Steven

    2012-07-04

    Clinical practice guidelines are one of the foundations of efforts to improve health care. In 1999, we authored a paper about methods to develop guidelines. Since it was published, the methods of guideline development have progressed both in terms of methods and necessary procedures and the context for guideline development has changed with the emergence of guideline clearing houses and large scale guideline production organisations (such as the UK National Institute for Health and Clinical Excellence). It therefore seems timely to, in a series of three articles, update and extend our earlier paper. In this first paper we discuss: the target audience(s) for guidelines and their use of guidelines; identifying topics for guidelines; guideline group composition (including consumer involvement) and the processes by which guideline groups function and the important procedural issue of managing conflicts of interest in guideline development.

  18. Guideline of guidelines: asymptomatic microscopic haematuria.

    Science.gov (United States)

    Linder, Brian J; Bass, Edward J; Mostafid, Hugh; Boorjian, Stephen A

    2018-02-01

    The aim of the present study was to review major organizational guidelines on the evaluation and management of asymptomatic microscopic haematuria (AMH). We reviewed the haematuria guidelines from: the American Urological Association; the consensus statement by the Canadian Urological Association, Canadian Urologic Oncology Group and Bladder Cancer Canada; the American College of Physicians; the Joint Consensus Statement of the Renal Association and British Association of Urological Surgeons; and the National Institute for Health and Care Excellence. All guidelines reviewed recommend evaluation for AMH in the absence of potential benign aetiologies, with the evaluation including cystoscopy and upper urinary tract imaging. Existing guidelines vary in their definition of AMH (role of urine dipstick vs urine microscopy), the age threshold for recommending evaluation, and the optimal imaging method (computed tomography vs ultrasonography). Of the reviewed guidelines, none recommended the use of urine cytology or urine markers during the initial AMH evaluation. Patients should have ongoing follow-up after a negative initial AMH evaluation. Significant variation exists among current guidelines for AMH with respect to who should be evaluated and in what manner. Given the patient and health system implications of balancing appropriately focused and effective diagnostic evaluation, AMH represents a valuable future research opportunity. © 2017 The Authors BJU International © 2017 BJU International Published by John Wiley & Sons Ltd.

  19. Human-system interface design review guideline -- Process and guidelines: Final report. Revision 1, Volume 1

    International Nuclear Information System (INIS)

    1996-06-01

    NUREG-0700, Revision 1, provides human factors engineering (HFE) guidance to the US Nuclear Regulatory Commission staff for its: (1) review of the human system interface (HSI) design submittals prepared by licensees or applications for a license or design certification of commercial nuclear power plants, and (2) performance of HSI reviews that could be undertaken as part of an inspection or other type of regulatory review involving HSI design or incidents involving human performance. The guidance consists of a review process and HFE guidelines. The document describes those aspects of the HSI design review process that are important to the identification and resolution of human engineering discrepancies that could adversely affect plant safety. Guidance is provided that could be used by the staff to review an applicant's HSI design review process or to guide the development of an HSI design review plan, e.g., as part of an inspection activity. The document also provides detailed HFE guidelines for the assessment of HSI design implementations. NUREG-0700, Revision 1, consists of three stand-alone volumes. Volume 1 consists of two major parts. Part 1 describes those aspects of the review process of the HSI design that are important to identifying and resolving human engineering discrepancies. Part 2 contains detailed guidelines for a human factors engineering review which identify criteria for assessing the implementation of an applicant's or licensee's HSI design

  20. Evaluation of HIV testing recommendations in specialty guidelines for the management of HIV indicator conditions

    DEFF Research Database (Denmark)

    Lord, E; Stockdale, A J; Malek, R

    2017-01-01

    OBJECTIVES: European guidelines recommend HIV testing for individuals presenting with indicator conditions (ICs) including AIDS-defining conditions (ADCs). The extent to which non-HIV specialty guidelines recommend HIV testing in ICs and ADCs is unknown. Our aim was to pilot a methodology in the UK...... are piloting methods to engage with guideline development groups to ensure that patients diagnosed with ICs/ADCs are tested for HIV. We then plan to apply our methodology in other European settings as part of the Optimising Testing and Linkage to Care for HIV across Europe (OptTEST) project....... to review specialty guidelines and ascertain if HIV was discussed and testing recommended. METHODS: UK and European HIV testing guidelines were reviewed to produce a list of 25 ADCs and 49 ICs. UK guidelines for these conditions were identified from searches of the websites of specialist societies...

  1. Integrating evidence-based interventions into client care plans.

    Science.gov (United States)

    Doran, Diane; Carryer, Jennifer; Paterson, Jane; Goering, Paula; Nagle, Lynn; Kushniruk, Andre; Bajnok, Irmajean; Clark, Carrie; Srivastava, Rani

    2009-01-01

    Within the mental health care system, there is an opportunity to improve patient safety and the overall quality of care by integrating clinical practice guidelines with the care planning process through the use of information technology. Electronic assessment tools such as the Resident Assessment Inventory - Mental Health (RAI-MH) are widely used to identify the health care needs and outcomes of clients. In this knowledge translation initiative, an electronic care planning tool was enhanced to include evidence-based clinical interventions from schizophrenia guidelines. This paper describes the development of a mental health decision support prototype, a field test by clinicians, and user experiences with the application.

  2. Project Gasbuggy well plugging and site restoration plan

    International Nuclear Information System (INIS)

    1978-07-01

    The operational plan for conducting the final restoration work at the site of the first U.S. underground nuclear experiment for the stimulation of low-productivity natural gas reservoirs is given. The plan includes well plugging procedures, surface facilities decontamination and removal procedures, radiological guidelines, and environmental considerations

  3. Some guidance on preparing validation plans for the DART Full System Models.

    Energy Technology Data Exchange (ETDEWEB)

    Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy (Sandia National Laboratories, Albuquerque, NM)

    2009-03-01

    Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generally applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.

  4. Electric heating guidelines: power smart home; 2. ed.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Guidelines, for use by B. C. Hydro, were established for proper planning and design of an electric heating system for residential buildings. The guidebook is divided into five sections: (1) comfort and electric heating systems, (2) contractors` guide to heat loss calculation, (3) imperial heat loss factors, (4) metric heat loss factors, and (5) installation guidelines for electric heating systems. Individual topics discussed include heat loss and the human body, heating systems and comfort, heat loss design, air leakage, and soil conductivity factors. Design considerations and equipment standards were described for the following electric heating systems: electric resistance baseboard systems, forced flow unitary heaters, electric radiant cable in-floor systems, radiant ceiling systems, forced warm air heating systems, furnaces, and heat pumps. 68 tabs., 29 figs.

  5. US Department of Energy, Westinghouse Hanford Company ARECO cesium transportation plan

    Energy Technology Data Exchange (ETDEWEB)

    Clements, E.P., Westinghouse Hanford

    1996-07-15

    The U.S. Department of Energy (DOE) is committed to the safe, efficient, and cost-effective transportation of all materials that support its various programs and activities. DOE strives to ensure that hazardous materials (particularly radioactive),hazardous substances, and hazardous mixed waste are handled and transported in compliance with all applicable federal, state,tribal, and local rules and regulations. This plan outlines the activities and responsibilities of DOE and other agencies that will be followed to conclude a significant movement of radioactive cesium (Cs) chloride capsules in a safe and uneventful manner. DOE-Headquarters (DOE-HQ) has directed that Cs capsules manufactured at the Waste Encapsulation and Storage Facility (WESF) be returned to WESF, located at DOE`s Hanford Site in southeast Washington State. Currently, there are 25 Cs capsules at the Applied Radiant Energy Corporation (ARECO)facility utilized for the polymerization of wood products in Lynchburg, Virginia, that requires removal as part of the overall Cs capsule return effort. This plan has been prepared in cooperation with member states of the Western Governors` Association (WGA) and the Southern States Energy Board (SSEB);the Council of State Governments Midwestern Office; and the Confederated Tribes of the Umatilla Indian Reservations, through whose jurisdictions these shipments will pass, and is an example of DOE-HQ`s commitment to early coordination and substantive involvement in its decision-making processes. This transportation plan identifies responsibilities, requirements,and procedures to ensure the success of the capsule return program. The plan summarizes transportation activities,organizational responsibilities, emergency preparedness guidelines, and other methods for achieving safe transport.

  6. New Tsunami Response, Mitigation, and Recovery Planning "Playbooks" for California (USA) Maritime Communities

    Science.gov (United States)

    Wilson, R. I.; Lynett, P. J.; Miller, K.; Eskijian, M.; Dengler, L. A.; Ayca, A.; Keen, A.; Admire, A. R.; Siegel, J.; Johnson, L. A.; Curtis, E.; Hornick, M.

    2015-12-01

    The 2010 Chile and 2011 Japan tsunamis both struck the California coast offering valuable experience and raised a number of significant issues for harbor masters, port captains, and other maritime entities. There was a general call for more planning products to help guide maritime communities in their tsunami response, mitigation, and recovery activities. The State of California is working with the U.S. Federal Emergency Management Agency (FEMA), the U.S. National Tsunami Hazard Mitigation Program (NTHMP), and other tsunami experts to provide communities with new tsunami planning tools to address these issues: Response Playbooks and plans have been developed for ports and harbors identifying potential tsunami current hazards and related damage for various size events. Maps have been generated showing minor, moderate, and severe damage levels that have been linked to current velocity thresholds of 3, 6, and 9 knots, respectively. Knowing this information allows harbor personnel to move ships or strengthen infrastructure prior to the arrival of distant source tsunamis. Damage probability tools and mitigation plans have been created to help reduce tsunami damage by evaluating the survivability of small and large vessels in harbors and ports. These results were compared to the actual damage assessments performed in California and Japan following the 2011 Japanese tsunami. Fragility curves were developed based on current velocity and direction to help harbor and port officials upgrade docks, piles, and related structures. Guidance documents are being generated to help in the development of both local and statewide recovery plans. Additional tools, like post-tsunami sediment and debris movement models, will allow harbors and ports to better understand if and where recovery issues are most likely to occur. Streamlining the regulatory and environmental review process is also a goal of the guidance. These maritime products and procedures are being integrated into guidance

  7. Workplace Disruption following Psychological Trauma: Influence of Incident Severity Level on Organizations' Post-Incident Response Planning and Execution

    Directory of Open Access Journals (Sweden)

    GS DeFraia

    2016-04-01

    Full Text Available Background: Psychologically traumatic workplace events (known as critical incidents, which occur globally, are increasing in prevalence within the USA. Assisting employers in their response is a growing practice area for occupational medicine, occupational social work, industrial psychology and other occupational health professions. Traumatic workplace events vary greatly in their level of organizational disruption. Objective: To explore whether extent of workplace disruption influences organizations' decisions for post-incident response planning and plan execution. Methods: Administrative data mining was employed to examine practice data from a workplace trauma response unit in the USA. Bivariate analyses were conducted to test whether scores from an instrument measuring extent of workplace disruption associated with organizational decisions regarding post-incident response. Results: The more severe and disruptive the incident, the more likely organizations planned for and followed through to deliver on-site interventions. Following more severe incidents, organizations were also more likely to deliver group sessions and to complete follow-up consultations to ensure ongoing worker recovery. Conclusion: Increasing occupational health practitioners' knowledge of varying levels of organizational disruption and familiarity with a range of organizational response strategies improves incident assessment, consultation and planning, and ensures interventions delivered are consistent with the level of assistance needed on both worker and organizational levels.

  8. Workplace Disruption following Psychological Trauma: Influence of Incident Severity Level on Organizations' Post-Incident Response Planning and Execution.

    Science.gov (United States)

    DeFraia, G S

    2016-04-01

    Psychologically traumatic workplace events (known as critical incidents), which occur globally, are increasing in prevalence within the USA. Assisting employers in their response is a growing practice area for occupational medicine, occupational social work, industrial psychology and other occupational health professions. Traumatic workplace events vary greatly in their level of organizational disruption. To explore whether extent of workplace disruption influences organizations' decisions for post-incident response planning and plan execution. Administrative data mining was employed to examine practice data from a workplace trauma response unit in the USA. Bivariate analyses were conducted to test whether scores from an instrument measuring extent of workplace disruption associated with organizational decisions regarding post-incident response. The more severe and disruptive the incident, the more likely organizations planned for and followed through to deliver on-site interventions. Following more severe incidents, organizations were also more likely to deliver group sessions and to complete follow-up consultations to ensure ongoing worker recovery. Increasing occupational health practitioners' knowledge of varying levels of organizational disruption and familiarity with a range of organizational response strategies improves incident assessment, consultation and planning, and ensures interventions delivered are consistent with the level of assistance needed on both worker and organizational levels.

  9. Role of operator response guidelines in CANDU 9 design program

    International Nuclear Information System (INIS)

    Jaitly, R.K.

    2000-01-01

    The CANDU 9 is a large version of the CANDU Pressurized Heavy Water Reactor (PHWR) system developed in Canada. With an electrical output of approximately 935 MWe, the CANDU 9 complements the established mid-size CANDU 6 (700 MWe) and makes use of proven technology updated with state of the art features resulting from ongoing development. The CANDU 9 builds on the reactor and process system designs of the operating Darlington and Bruce B plants, and incorporates a modified CANDU 6 station layout, as well as improved construction methods and operational features. A high level of standardization has always been a feature of CANDU reactors. This theme is emphasized in the CANDU 9; all key components (reactor core, steam generators, coolant pumps, pressure tubes, etc.) are of the same design as those proven in service in the operating CANDU power stations. Including Probabilistic Safety Assessment (PSA) as part of the CANDU 9 design process from the outset of the program was seen as key to ensuring completeness of safety related requirements. The PSA work provided an in-depth understanding of the plant response to various postulated accidents. As well, the time frame for recovery and the related operator actions were identified. This information together with AECL's experience in supporting the development of Emergency Operating Procedures (EOPs) for the operating CANDU reactors are the basis for preparation of CANDU 9 Operator Response Guidelines (ORGs). Technical content, format and human factors considerations adopted for the ORGs are such that these can be readily converted to EOPs. The scope of ORGs includes generic as well as event specific ORGs. This dual approach is required to provide defense-in-depth. This paper describes the process used to prepare ORGs for the CANDU 9 reactor and discusses important benefits gained from the application of ORGs as input to the control center design and future preparation of the EOPs. (author)

  10. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    Energy Technology Data Exchange (ETDEWEB)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  11. Experience Report: Constraint-Based Modelling and Simulation of Railway Emergency Response Plans

    DEFF Research Database (Denmark)

    Debois, Søren; Hildebrandt, Thomas; Sandberg, Lene

    2016-01-01

    ways to proceed, including ways not necessarily anticipated in the paper-based emergency response plans. The case study was undertaken as part of a short research, ProSec, project funded by the Danish Defence Agency, with the aim of applying and developing methods for collaborative mapping of emergency...

  12. Non-power radwaste inventory, characteristics, storage and disposal plan in China

    International Nuclear Information System (INIS)

    Zhao Yamin; Guo Zede

    1997-01-01

    Based on the practical experience regarding L/ILW management, national management system and waste management principles have been established in China, and their key points are summarized as follows: The National Environmental Protection Agency (NEPA) is responsible for the centralized management of country's radwastes: unified planning; organizing coordinations; licensing; supervising and inspecting the activities of environment protection. The China national Nuclear Corporation (CNNC) takes the responsibility of research and development of radwaste management; siting, construction, and operating disposal facilities; technical support for making regulations, standards and guidelines. The units using radioactive isotopes and producing radwastes should take charge of temporal storage of their own wastes. L/ILW management principles: controlling waste generation amount as less as possible; collecting wastes according to their categories; reducing volume and immobilizing; reliably packaging; interim storage and disposal. This paper is limited to introduce the waste from nuclear technology application, its inventory, characteristics, interim storage and disposal plan. Information concerning L/ILW management, not limited nuclear technology application radwaste, can be found in references. 4 refs

  13. Deriving cleanup guidelines for radionuclides at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

    1997-01-01

    Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL`s Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory. With the exception of radium, there are no regulations or guidelines to establish cleanup guidelines for radionuclides in soils at BNL. BNL must derive radionuclide soil cleanup guidelines for a number of Operable Units (OUs) and Areas of Concern (AOCs). These guidelines are required by DOE under a proposed regulation for radiation protection of public health and the environment as well as to satisfy the requirements of CERCLA. The objective of this report is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL. Implementation of the approach is briefly discussed.

  14. Deriving cleanup guidelines for radionuclides at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

    1997-01-01

    Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL's Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory. With the exception of radium, there are no regulations or guidelines to establish cleanup guidelines for radionuclides in soils at BNL. BNL must derive radionuclide soil cleanup guidelines for a number of Operable Units (OUs) and Areas of Concern (AOCs). These guidelines are required by DOE under a proposed regulation for radiation protection of public health and the environment as well as to satisfy the requirements of CERCLA. The objective of this report is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL. Implementation of the approach is briefly discussed

  15. Development of a theory- and evidence-based intervention to enhance implementation of physical therapy guidelines for the management of low back pain.

    Science.gov (United States)

    Rutten, Geert M; Harting, Janneke; Bartholomew, Leona K; Braspenning, Jozé C; van Dolder, Rob; Heijmans, Marcel Fgj; Hendriks, Erik Jm; Kremers, Stef Pj; van Peppen, Roland Ps; Rutten, Steven Tj; Schlief, Angelique; de Vries, Nanne K; Oostendorp, Rob Ab

    2014-01-15

    Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process.

  16. Center for Plant Conservation's Best Practice Guidelines for the reintroduction of rare plants

    Institute of Scientific and Technical Information of China (English)

    Joyce Maschinski; Matthew A. Albrecht

    2017-01-01

    Recent estimates indicate that one-fifth of botanical species worldwide are considered at risk of becoming extinct in the wild. One available strategy for conserving many rare plant species is reintro-duction, which holds much promise especially when carefully planned by following guidelines and when monitored long-term. We review the Center for Plant Conservation Best Reintroduction Practice Guidelines and highlight important components for planning plant reintroductions. Before attempting reintro-ductions practitioners should justify them, should consider alternative conservation strategies, under-stand threats, and ensure that these threats are absent from any recipient site. Planning a reintroduction requires considering legal and logistic parameters as well as target species and recipient site attributes. Carefully selecting the genetic composition of founders, founder population size, and recipient site will influence establishment and population growth. Whenever possible practitioners should conduct rein-troductions as experiments and publish results. To document whether populations are sustainable will require long-term monitoring for decades, therefore planning an appropriate monitoring technique for the taxon must consider current and future needs. Botanical gardens can play a leading role in devel-oping the science and practice of plant reintroduction.

  17. Guidelines for authorities and operators from the EURATOM regulation according to nuclear safety

    International Nuclear Information System (INIS)

    Karpenstein, Ulrich

    2010-01-01

    At 22nd July, 2009 the guideline 2009/71/EURATOM on a community framework for the nuclear security of nuclear installations comes into effect. A lot of regulations of this guideline intervene very deeply in the competencies of the member states. In acknowledgment of the national responsibility for nuclear security, the guideline grants large free space to the member states. Thereby, the guideline aims at a general legal framework and a mutual learning process off.

  18. Public comments and responses to the 1993 Hanford cleanup five-year plan

    International Nuclear Information System (INIS)

    1993-08-01

    In March 1993, the US Department of Energy, Richland Operations Office (DOE-RL) published its annual Site-Specific Five-Year Plan. The Site-Specific Plan is published to inform the public about the background, status, and plans for Environmental Restoration (ER) and Waste Management (WM) activities at the Hanford site. It is the only document that seeks to bring all ER and WM elements together in one document. The Site-Specific Plan is a companion document to the National Five-Year Plan that deals with all the sites within the DOE complex on a summary level. This Response to Comments document does not try to address every question or concern raised during the public comment period. Some questions were outside the scope of the Five-Year Plan, some we could not decipher, others were variations of the same question. The initial round of public meetings was held in Portland, Oregon, and Seattle, Pasco, and Olympia, Washington. At the request of the Oregon Department of Energy (ODOE) and the Washington State Department of Ecology (Ecology), a second round of meetings was held in Portland and Olympia. Both agencies felt that the first two meetings were held with too little advance notice, and before the Plan could be distributed. Once the public meetings were over and the comment period closed, we then compiled the public comments, largely from audio tapes of the meetings. Individual functions within Hanford were asked to consider and respond to the comments

  19. Planning procedures towards high climatic quality cities. Example referring to Lisbon

    Directory of Open Access Journals (Sweden)

    Maria João Alcoforado

    2006-12-01

    Full Text Available The different stages of research on high climatic quality city are presented in this paper: acquisition of appropriate urban climate information, analysis of different urban climate features and selection of planning strategies (accordingly with the climate zone. Then, with the aid of a GIS, systematic guidelines for planning can be given. As a result, different types of benefits for city dwellers are to be expected (comfort, health, economic. Lisbon is presented as a case study. It is shown how the “translation” of the knowledge of Lisbon’s urban climate into simple guidelines for urban planning in order to mitigate the urban heat island, promote ventilation and increase air quality, was carried out. To this end, maps of the physical features of the city of Lisbon were drawn, synthesised into “urban homogeneous units” map. Climate guidelines are specified for each of the six groups of units (brought together according to urban morphology, topography and position in town.

  20. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    Science.gov (United States)

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is

  1. BIM Guidelines Inform Facilities Management Databases: A Case Study over Time

    Directory of Open Access Journals (Sweden)

    Karen Kensek

    2015-08-01

    Full Text Available A building information model (BIM contains data that can be accessed and exported for other uses during the lifetime of the building especially for facilities management (FM and operations. Working under the guidance of well-designed BIM guidelines to insure completeness and compatibility with FM software, architects and contractors can deliver an information rich data model that is valuable to the client. Large owners such as universities often provide these detailed guidelines and deliverable requirements to their building teams. Investigation of the University of Southern California (USC Facilities Management Service’s (FMS website showed a detailed plan including standards, file names, parameter lists, and other requirements of BIM data, which were specifically designated for facilities management use, as deliverables on new construction projects. Three critical details were also unearthed in the reading of these documents: Revit was the default BIM software; COBie was adapted to help meet facilities management goals; and EcoDomus provided a display of the collected data viewed through Navisworks. Published accounts about the Cinema Arts Complex developed with and under these guidelines reported positive results. Further examination with new projects underway reveal the rapidly changing relational database landscape evident in the new USC “Project Record Revit Requirement Execution Plan (PRxP”.

  2. KAERI software verification and validation guideline for developing safety-critical software in digital I and C system of NPP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jang Yeol; Lee, Jang Soo; Eom, Heung Seop

    1997-07-01

    This technical report is to present V and V guideline development methodology for safety-critical software in NPP safety system. Therefore it is to present V and V guideline of planning phase for the NPP safety system in addition to critical safety items, for example, independence philosophy, software safety analysis concept, commercial off the shelf (COTS) software evaluation criteria, inter-relationships between other safety assurance organizations, including the concepts of existing industrial standard, IEEE Std-1012, IEEE Std-1059. This technical report includes scope of V and V guideline, guideline framework as part of acceptance criteria, V and V activities and task entrance as part of V and V activity and exit criteria, review and audit, testing and QA records of V and V material and configuration management, software verification and validation plan production etc., and safety-critical software V and V methodology. (author). 11 refs.

  3. KAERI software verification and validation guideline for developing safety-critical software in digital I and C system of NPP

    International Nuclear Information System (INIS)

    Kim, Jang Yeol; Lee, Jang Soo; Eom, Heung Seop.

    1997-07-01

    This technical report is to present V and V guideline development methodology for safety-critical software in NPP safety system. Therefore it is to present V and V guideline of planning phase for the NPP safety system in addition to critical safety items, for example, independence philosophy, software safety analysis concept, commercial off the shelf (COTS) software evaluation criteria, inter-relationships between other safety assurance organizations, including the concepts of existing industrial standard, IEEE Std-1012, IEEE Std-1059. This technical report includes scope of V and V guideline, guideline framework as part of acceptance criteria, V and V activities and task entrance as part of V and V activity and exit criteria, review and audit, testing and QA records of V and V material and configuration management, software verification and validation plan production etc., and safety-critical software V and V methodology. (author). 11 refs

  4. Radiotherapy Facilities: Master Planning and Concept Design Considerations (Russian Edition)

    International Nuclear Information System (INIS)

    2015-01-01

    This publication provides guidelines on how to plan a radiotherapy facility in terms of the strategic master planning process including the legal, technical and infrastructure requirements. It outlines a risk assessment methodology and a typical project work plan, and describes the professional expertise required for the implementation of such a project. Generic templates for a block design are suggested, which include possibilities for future expansion. These templates can be overlaid onto the designated site such that the most efficient workflow between the main functional areas can be ensured. A sample checklist is attached to act as a guideline for project management and to indicate the critical stages in the process where technical expert assistance may be needed. The publication is aimed at professionals and administrators involved in infrastructure development, planning and facility management, as well as engineers, building contractors and radiotherapy professionals

  5. Developing Guidelines for HIV Antibody Testing among Victims of Pediatric Sexual Abuse.

    Science.gov (United States)

    Gellert, George A.; And Others

    1990-01-01

    An interim set of human immunodeficiency virus (HIV) testing guidelines for victims of pediatric sexual abuse (PSA) is proposed. Guidelines are based on responses of 63 practitioners of PSA assessment to 7 hypothetical clinical profiles with 12 testing criteria. (Author/DB)

  6. Ontario Hydro's transportation of radioactive material and emergency response plan

    International Nuclear Information System (INIS)

    Karmali, N.

    1993-01-01

    Ontario Hydro has been transporting radioactive material for almost 30 years without any exposure to the public or release to the environment. However, there have been three accidents involving Hydro's shipments of radioactive material. In addition to the quality packaging and shipping program, Ontario Hydro has an Emergency Response Plan and capability to deal with an accident involving a shipment of radioactive material. The Corporation's ability to respond, to effectively control and contain the situation, site remediation, and to provide emergency public information in the event of a road accident minimizes the risk to the public and the environment. This emphasizes their commitment to worker safety, public safety and impact to the environment. Response capability is mandated under various legislation and regulations in Canada

  7. WECC Variable Generation Planning Reference Book: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Makarov, Yuri V.; Du, Pengwei; Etingov, Pavel V.; Ma, Jian; Vyakaranam, Bharat

    2013-05-13

    The document titled “WECC Variable Generation Planning Reference Book”. This book is divided into two volumes; one is the main document (volume 1)and the other is appendices (volume 2). The main document is a collection of the best practices and the information regarding the application and impact of variables generation on power system planning. This volume (appendices) has additional information on the following topics: Probabilistic load flow problems. 2. Additional useful indices. 3. high-impact low-frequency (HILF) events. 4. Examples of wide-area nomograms. 5. Transmission line ratings, types of dynamic rating methods. 6. Relative costs per MW-km of different electric power transmission technologies. 7. Ultra-high voltage (UHV) transmission. 8.High voltage direct current (VSC-HVDC). 9. HVDC. 10. Rewiring of existing transmission lines. 11. High-temperature low sag (HTLS) conductors. 12. The direct method and energy functions for transient stability analysis in power systems. 13.Blackouts caused by voltage instability. 14. Algorithm for parameter continuation predictor-corrector methods. 15. Approximation techniques available for security regions. 16. Impacts of wind power on power system small signals stability. 17. FIDVR. 18. FACTS. 19. European planning standard and practices. 20. International experience in wind and solar energy sources. 21. Western Renewable Energy Zones (WREZ). 22. various energy storage technologies. 23. demand response. 24. BA consolidation and cooperation options. 25. generator power management requirements and 26. European planning guidelines.

  8. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  9. [Standards and guidelines of radiation protection and safety in dental X-ray examinations].

    Science.gov (United States)

    Guo, X L; Li, G; Cheng, Y; Yu, Q; Wang, H; Zhang, Z Y

    2017-12-09

    With the rapid development of imaging technology, the application of dental imaging in diagnosis, treatment planning, intraoperative surgical navigation, monitoring of treatment or lesion development and assessment of treatment outcomes is playing an essential role in oral healthcare. The increased total number of dental X-ray examinations is accompanied by a relatively significant increase in collective dose to patients as well as to dental healthcare workers, which is harmful to human bodies to a certain degree. Some radiation protection standards and guidelines in dental radiology have been published in European countries, US, Canada and Australia, etc. Adherence to these standards and guidelines helps to achieve images with diagnostic quality and avoid unnecessary and repeated exposures. However, no radiation protection standard or guideline with regard to dental X-ray examinations has been put in force so far in mainland China. Therefore, a literature review on available radiation protection standards and guidelines was conducted to provide reference to the development of radiation protection standards or guidelines in mainland China.

  10. Computed tomography-based treatment planning for high-dose-rate brachytherapy using the tandem and ring applicator: influence of applicator choice on organ dose and inter-fraction adaptive planning

    Directory of Open Access Journals (Sweden)

    Vishruta A. Dumane

    2017-06-01

    Full Text Available Three dimensional planning for high-dose-rate (HDR brachytherapy in cervical cancer has been highly recommended by consensus guidelines such as the American Brachytherapy Society (ABS and the Groupe Européen de Curiethérapie – European Society for Radiotherapy and Oncology (GEC-ESTRO. In this document, we describe our experience with computed tomography (CT-based planning using the tandem/ring applicator. We discuss the influence of applicator geometry on doses to organs at risk (OARs, namely the bladder, rectum, and sigmoid. Through example cases with dose prescribed to point A, we demonstrate how adaptive planning can help achieve constraints to the OARs as per guidelines.

  11. Report to Congress on status of emergency response planning for nuclear power plants

    International Nuclear Information System (INIS)

    1981-03-01

    This report responds to a request (Public Law 96-295, Section 109) for the Nuclear Regulatory Commission (NRC) to report to Congress on the status of emergency response planning in support of nuclear power reactors. The report includes information on the status of this planning as well as on the Commission actions relating to emergency preparedness. These actions include a summary of the new regulatory requirements and the preliminary results of two comprehensive Evacuation Time Estimate studies; one requested by the NRC including 50 nuclear power plant sites and one conducted by the Federal Emergency Management Agency (FEMA) for 12 high population density sites. FEMA provided the information in this report on the status of State and local planning, including projected schedules for joint State/county/licensee emergency preparedness exercises. Included as Appendicies are the NRC Emergency Planning Final Regulations, 10 CFR Part 50 (45 FR 55402), the FEMA Proposed Rule, 'Review and Approval of State and Local Radiological Emergency Plans and Preparedness', 44 CFR Part 350 (45 FR 42341) and the NRC/FEMA Memorandums of Understanding

  12. Clinicians adopting evidence based guidelines: a case study with thromboprophylaxis

    Directory of Open Access Journals (Sweden)

    Fry Margaret

    2011-09-01

    Full Text Available Abstract Background Venous Thromboembolism (VTE is a cause of hospital mortality and managing its morbidity is associated with significant expenditure. Uptake of evidenced based guideline recommendations intended to prevent VTE in hospital settings is sub-optimal. This study was conducted to explore clinicians' attitudes and the clinical environment in which they work to understand their reluctance to adopt VTE prophylaxis guidelines. Methods Between February and November 2009, 40 hospital employed doctors from 2 Australian metropolitan hospitals were interviewed in depth. Qualitative data were analysed according to thematic methodology. Results Analysis of interviews revealed that barriers to evidence based practice include i the fragmented system of care delivery where multiple members of teams and multiple teams are responsible for each patient's care, and in the case of VTE, where everyone shares responsibility and no-one in particular is responsible; ii the culture of practice where team practice is tailored to that of the team head, and where medicine is considered an 'art' in which guidelines should be adapted to each patient rather than applied universally. Interviewees recommend clear allocation of responsibility and reminders to counteract VTE risk assessment being overlooked. Conclusions Senior clinicians are the key enablers for practice change. They will need to be convinced that guideline compliance adds value to their patient care. Then with the support of systems in the organisation designed to minimize the effects of care fragmentation, they will drive practice changes in their teams. We believe that evidence based practice is only possible with a coordinated program that addresses individual, cultural and organisational constraints.

  13. Methodological Guidelines for Advertising Research

    DEFF Research Database (Denmark)

    Rossiter, John R.; Percy, Larry

    2017-01-01

    In this article, highly experienced advertising academics and advertising research consultants John R. Rossiter and Larry Percy present and discuss what they believe to be the seven most important methodological guidelines that need to be implemented to improve the practice of advertising research....... Their focus is on methodology, defined as first choosing a suitable theoretical framework to guide the research study and then identifying the advertising responses that need to be studied. Measurement of those responses is covered elsewhere in this special issue in the article by Bergkvist and Langner. Most...

  14. Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia

    Science.gov (United States)

    Said, N. F. Md; Sidek, L. M.; Basri, H.; Muda, R. S.; Razad, A. Z. Abdul

    2016-03-01

    Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.

  15. Aquaponics in Urban Agriculture: Social Acceptance and Urban Food Planning

    Directory of Open Access Journals (Sweden)

    Georgia Pollard

    2017-06-01

    Full Text Available Aquaponics is emerging as a novel technology with particular potential for urban agriculture (UA. The social acceptance of aquaponics and its place in urban food planning has not previously been studied. This study used focus groups, key informant interviews, and scenario analyses to investigate the reactions of Adelaide’s urban food opinion leaders and local government area (LGA officials to aquaponics. Most of the focus group participants were unfamiliar with aquaponics. The perceived negatives of the technology received greater attention than the perceived benefits. Aquaponics was thought to be most competitive in either niche or wholesale markets, with a need for scaled guidelines from backyard to large-scale commercial production. For aquaponics in urban settings the influence of urban planning and policy is an important, but to date unstudied, consideration. The urban growers’ opinions of the overcomplicated nature of urban food planning corresponded with the mixed policy responses of the LGAs towards UA. This further supports the participants’ desire for a supportive State Government stance on UA to encourage consistency in LGAs.

  16. Provision of Family Planning Services in Tanzania: A Comparative ...

    African Journals Online (AJOL)

    Adherence to the policy guidelines and standards is necessary for family planning services. We compared public and private facilities in terms of provision of family planning services. We analyzed data from health facility questionnaire of the 2006 Tanzania Service Provision Assessment survey, based on 529 health ...

  17. Formalized 2003 European Guidelines on Cardiovascular Disease Prevention in Clinical Practice

    Czech Academy of Sciences Publication Activity Database

    Peleška, Jan; Anger, Z.; Buchtela, David; Tomečková, Marie; Veselý, Arnošt

    2004-01-01

    Roč. 25, - (2004), s. 444 ISSN 0195-668X. [ESC Congress 2004. 28.08.2004-01.09.2004, Munich] Institutional research plan: CEZ:AV0Z1030915 Keywords : formalized European guidelines on CVD prevention * computer GLIF model * decision algorithm Subject RIV: BD - Theory of Information

  18. 20 CFR 641.310 - May the Governor delegate responsibility for developing and submitting the State Plan?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false May the Governor delegate responsibility for developing and submitting the State Plan? 641.310 Section 641.310 Employees' Benefits EMPLOYMENT AND TRAINING... developing and submitting the State Plan, provided that any such delegation is consistent with State law and...

  19. Guidelines Gas Act. Information and Consultation Document 2001

    International Nuclear Information System (INIS)

    De Groene, P.; Teljeur, E.; Verdonkschot, I.R.

    2001-06-01

    This Information and Consultation Document has been drawn up for the consultation period that will be held prior to the approval of the new Guidelines, in accordance with sections 13 and 18 of the Dutch Gas Act. In determining the topics for discussion in the consultation document, DTe has based its decision on the scope and aim of these Guidelines. In doing so, DTe's objective is to achieve these aims in a responsible manner, with limited interventions in the market. The Guidelines focus firstly on gas transport companies, in so far as they transport gas to supply eligible customers. In the year 2002, customers with an annual off-take of 1 million m 3 or more will be eligible. Secondly, the Guidelines focus on gas storage companies that have a dominant position or are deemed to have a dominant position, in accordance with section 18(2) of the Gas Act. In determining the Guidelines, in accordance with section 13(1) of the Gas Act, the Director of DTe has to take into account the promotion of trade and the promotion of the efficient operation of gas transport companies and users of the gas network. In addition, it appears from the Parliamentary Proceedings that the Guidelines also have the aim of preventing abuse of a dominant position. This document indicates the way DTe intends to achieve the statutory aims referred to above. Partly on the basis of experience in other countries, DTe assumes that realising these aims and creating a 'level playing field' on the Dutch gas market is a gradual process that may take several years. It will not be possible to realise all the conditions for achieving the above-mentioned objectives, as outlined by DTe in the Information and Consultation Document, in 2002. DTe therefore intends to limit the Guidelines for the year 2002 to the conditions that have priority. The aim of the consultation process and the responses of the various markets players is partly to determine the conditions that have priority. For the purposes of

  20. ANSI/ANS-8.23-1997: nuclear criticality accident emergency planning and response

    International Nuclear Information System (INIS)

    Baker, J.S.

    2004-01-01

    American National Standard ANSUANS-8.23 was developed to expand upon the basic emergency response guidance given in American National Standard, 'Administrative Practices for Nuclear Criticality Safety' ANSI/ANS-8.19-1996 (Ref. 1). This standard provides guidance for minimizing risks to personnel during emergency response to a nuclear criticality accident outside reactors. This standard is intended to apply to those facilities for which a criticality accident alarm system, as specified in American National Standard, 'Criticality Accident Alarm System', ANSI/ANS-8.3-1997 (Ref. 2) is in use. The Working Group was established in 1990, with Norman L. Pruvost as chairman. The Working Group had up to twenty-three members representing a broad range of the nuclear industry, and has included members from Canada, Japan and the United Kingdom. The initial edition of ANSI/ANS-8.23 was approved by the American National Standards Institute on December 30, 1997. It provides guidance for the following topics: (1) Management and technical staff responsibilities; (2) Evaluation of a potential criticality accident; (3) Emergency plan provisions; (4) Evacuation; (5) Re-entry, rescue and stabilization; and (6) Classroom training, exercises and evacuation drills. This guidance is not for generic emergency planning issues, but is specific to nuclear criticality accidents. For example, it assumes that an Emergency Plan is already established at facilities that implement the standard. During the development of the initial edition of ANSI/ANS-8.23, each Working Group member evaluated potential use of the standard at a facility with which the member was familiar. This revealed areas where a facility could have difficulty complying with the standard. These reviews helped identify and eliminate many potential problems and ambiguities with the guidance. The Working Group has received very limited feedback from the user community since the first edition of the standard was published. Suggestions

  1. Developing an Implementation Guideline to International Standard School for Schools under Secondary Educational Service Area Office 25

    Directory of Open Access Journals (Sweden)

    Worawut Poltree

    2017-09-01

    Full Text Available The objectives of developing an implementation guideline to international standard school for schools under secondary educational service area office 25 were ; 1 to study present and problem an implementation guideline to international standard school for schools under secondary educational service area office 25 and 2 to develop an implementation guideline to international standard school for schools under secondary educational service area office 25. There were 68 samples ; administrators, deputy administrators, head of quality management systems, and academic teachers by purposive sampling. The tools used to collect the data were the five level scale questionnaire and structured interviews. Data were analyzed using mean, standard deviation, and descriptive analysis. The researcher set the research by 2 phase. The first phase educated present and problem an implementation guideline to international standard school for schools under secondary educational service area office 25. The research was assessed feasibility of developing an implementation guideline to international standard school for schools under secondary educational service area office 25 by 5 experts. The research results were: 1. The present and problem an implementation guideline to international standard school for schools under secondary educational service area office 25 found that the overall present were at the high level and each one was at the high level. The overall problem were at the low and each one was at the moderate 2 aspects ; The leadership and the focus on personnel. Then it was at the low level. 2. Developing an implementation guideline to international standard school for schools under secondary educational service area office 25 found that 1 the leadership had set with the vision, values, performance of the school’s senior leadership, including good governance of the school, implementation of the ethics law, and responsibility for the community, 2 strategic

  2. Towards a national burns disaster plan | Rogers | South African ...

    African Journals Online (AJOL)

    The International Society for Burns Injuries (ISBI) has published guidelines for the management of multiple or mass burns casualties, and recommends that 'each country has or should have a disaster planning system that addresses its own particular needs. The need for a national burns disaster plan integrated with ...

  3. Constraining Influence Diagram Structure by Generative Planning: An Application to the Optimization of Oil Spill Response

    OpenAIRE

    Agosta, John Mark

    2013-01-01

    This paper works through the optimization of a real world planning problem, with a combination of a generative planning tool and an influence diagram solver. The problem is taken from an existing application in the domain of oil spill emergency response. The planning agent manages constraints that order sets of feasible equipment employment actions. This is mapped at an intermediate level of abstraction onto an influence diagram. In addition, the planner can apply a surveillance operator that...

  4. Human-system interface design review guideline -- Process and guidelines: Final report. Revision 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-06-01

    NUREG-0700, Revision 1, provides human factors engineering (HFE) guidance to the US Nuclear Regulatory Commission staff for its: (1) review of the human system interface (HSI) design submittals prepared by licensees or applications for a license or design certification of commercial nuclear power plants, and (2) performance of HSI reviews that could be undertaken as part of an inspection or other type of regulatory review involving HSI design or incidents involving human performance. The guidance consists of a review process and HFE guidelines. The document describes those aspects of the HSI design review process that are important to the identification and resolution of human engineering discrepancies that could adversely affect plant safety. Guidance is provided that could be used by the staff to review an applicant`s HSI design review process or to guide the development of an HSI design review plan, e.g., as part of an inspection activity. The document also provides detailed HFE guidelines for the assessment of HSI design implementations. NUREG-0700, Revision 1, consists of three stand-alone volumes. Volume 1 consists of two major parts. Part 1 describes those aspects of the review process of the HSI design that are important to identifying and resolving human engineering discrepancies. Part 2 contains detailed guidelines for a human factors engineering review which identify criteria for assessing the implementation of an applicant`s or licensee`s HSI design.

  5. DOE-owned spent nuclear fuel program plan

    International Nuclear Information System (INIS)

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines

  6. DOE-owned spent nuclear fuel program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines.

  7. Indian Point Nuclear Power Station: verification analysis of County Radiological Emergency-Response Plans

    International Nuclear Information System (INIS)

    Nagle, J.; Whitfield, R.

    1983-05-01

    This report was developed as a management tool for use by the Federal Emergency Management Agency (FEMA) Region II staff. The analysis summarized in this report was undertaken to verify the extent to which procedures, training programs, and resources set forth in the County Radiological Emergency Response Plans (CRERPs) for Orange, Putnam, and Westchester counties in New York had been realized prior to the March 9, 1983, exercise of the Indian Point Nuclear Power Station near Buchanan, New York. To this end, a telephone survey of county emergency response organizations was conducted between January 19 and February 22, 1983. This report presents the results of responses obtained from this survey of county emergency response organizations

  8. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 1, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  9. Postdoctoral program guidelines.

    Energy Technology Data Exchange (ETDEWEB)

    Teich-McGoldrick, Stephanie; Miller, Andrew W.; Sava, Dorina Florentina; Liu, Yanli; Ferreira, Summer Rhodes; Biedermann, Laura Butler; Cruz-Campa, Jose Luis; Hall, Lisa Michelle; Liu, Xiaohua H.; Ekoto, Isaac

    2012-04-01

    We, the Postdoc Professional Development Program (PD2P) leadership team, wrote these postdoc guidelines to be a starting point for communication between new postdocs, their staff mentors, and their managers. These guidelines detail expectations and responsibilities of the three parties, as well as list relevant contacts. The purpose of the Postdoc Program is to bring in talented, creative people who enrich Sandia's environment by performing innovative R&D, as well as by stimulating intellectual curiosity and learning. Postdocs are temporary employees who come to Sandia for career development and advancement reasons. In general, the postdoc term is 1 year, renewable up to five times for a total of six years. However, center practices may vary; check with your manager. At term, a postdoc may apply for a staff position at Sandia or choose to move to university, industry or another lab. It is our vision that those who leave become long-term collaborators and advocates whose relationships with Sandia have a positive effect upon our national constituency.

  10. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan. Part 1: ASC software quality engineering practices, Version 2.0.

    Energy Technology Data Exchange (ETDEWEB)

    Sturtevant, Judith E.; Heaphy, Robert; Hodges, Ann Louise; Boucheron, Edward A.; Drake, Richard Roy; Minana, Molly A.; Hackney, Patricia; Forsythe, Christi A.; Schofield, Joseph Richard, Jr. (,; .); Pavlakos, Constantine James; Williamson, Charles Michael; Edwards, Harold Carter

    2006-09-01

    The purpose of the Sandia National Laboratories Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. The plan defines the ASC program software quality practices and provides mappings of these practices to Sandia Corporate Requirements CPR 1.3.2 and 1.3.6 and to a Department of Energy document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines. This document also identifies ASC management and software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals.

  11. Oxytocin augmentation during labor: how to implement medical guidelines into clinical practice.

    Science.gov (United States)

    Holmgren, Stina; Silfver, Kristina Gren; Lind, Cecilia; Nordström, Lennart

    2011-11-01

    To describe an extensive process to implement guidelines for oxytocin use during labor and to report its effects on compliance to clinical practice guidelines after 1 year. A multifaceted strategy was developed to involve all obstetric staff and identify possible local barriers to change in advance. The process lasted for more than 1 year. To describe the implementation of oxytocin use according to the new guidelines, and to compare management in clinical practice with guideline recommendations from audits performed before and after the project. Identification of possible barriers to change, academic detailing, audits with feedback, and local opinion leaders were important factors for a successful process. Documentation of the indication for oxytocin use increased from 54% before, to 86% after the completion of the project (Pcheck list to monitor oxytocin use. However, audits with feedback need to continue for medical safety, and have been planned to take place every 6 months. Copyright © 2011 Elsevier B.V. All rights reserved.

  12. Progress and challenges in freshwater conservation planning

    CSIR Research Space (South Africa)

    Nel, JL

    2009-06-01

    Full Text Available are suggested for promoting effective implementation: assessing socioeconomic and institutional contexts, promoting cooperation, and embedding plans within a monitoring and evaluation framework. These guidelines are based on experiences from integrated water...

  13. Contraception: Everyone's responsibility

    African Journals Online (AJOL)

    The use of modern methods of contraception in married women or women in union ... Contraception and Fertility Planning Policy and Service Delivery. Guidelines and .... methods. Injectable contraceptives have for a long time been offered.

  14. Dental students′ compliance with antibiotic prescribing guidelines for dental infections in children

    Directory of Open Access Journals (Sweden)

    Yee Chen Wong

    2016-01-01

    Full Text Available Context: To investigate the antibiotic prescribing training received by dental students, clinical experience in treating child patients, awareness of antibiotic prescribing guidelines, preparedness in antibiotic prescribing, and compliance with antibiotic prescribing guidelines for the management of dental infections in children. Methods: This was a cross-sectional study involving final year dentals students from Malaysian and Asian dental schools. A self-administered questionnaire consisting of five clinical case scenarios was e-mailed to all final year students at selected dental schools. Students′ responses were compared for each clinical case scenario with the prescribing guidelines of the American Academy of Pediatric Dentistry and the American Dental Association. Compliance in each scenario was tested for association with their preparedness in antibiotic prescribing, previous training on antibiotic prescribing and awareness of antibiotic prescribing guidelines using Chi-square test. Data collected were analyzed using SPSS statistics version 20. Results: A total of 108 completed responses were received. About 74 (69% students were from Malaysian dental schools. The compliance rate with prescribing guidelines ranged from 15.7% to 43.5%. Those attending Malaysian dental schools (47.3% and those who had treated child patient more often (46.3% were more likely (P < 0.05 to be aware of the guidelines. Those who had received antibiotic prescribing training (21.3% were more likely to think they were well prepared in antibiotic prescribing (P < 0.05. Conclusions: Final year dental students had low awareness and compliance with antibiotic prescribing guidelines. Further research is needed to investigate how compliance with the guidelines may be enhanced.

  15. [The national Dutch Institute for Healthcare Improvement guidelines 'Preoperative trajectory': the essentials].

    Science.gov (United States)

    Wolff, André P; Boermeester, Marja; Janssen, Ingrid; Pols, Margreet; Damen, Johan

    2010-01-01

    In view of the shortcomings of the organisation of the perioperative process that have been ascertained by the Dutch Health Inspectorate (IGZ), the Inspectorate has requested hospitals and care professionals to implement measures to improve this situation. In response to the IGZ's first report, the Dutch Institute for Healthcare Improvement (CBO) has developed the national, multiprofessional guidelines entitled 'Preoperative Trajectory' which were published in January 2010. Implementation of these guidelines should improve communication between professionals and lead to standardization and transparency of the preoperative patient care process, with uniform handovers and clear responsibilities. These guidelines are the first to provide recommendations at process of care level which are intended to increase patient safety and reduce the risk of damage to patients.

  16. Urgent need to reevaluate the latest World Health Organization guidelines for toxic inorganic substances in drinking water.

    Science.gov (United States)

    Frisbie, Seth H; Mitchell, Erika J; Sarkar, Bibudhendra

    2015-08-13

    The World Health Organization (WHO) has established guidelines for drinking-water quality that cover biological and chemical hazards from both natural and anthropogenic sources. In the most recent edition of Guidelines for Drinking-water Quality (2011), the WHO withdrew, suspended, did not establish, or raised guidelines for the inorganic toxic substances manganese, molybdenum, nitrite, aluminum, boron, nickel, uranium, mercury, and selenium. In this paper, we review these changes to the WHO drinking-water guidelines, examining in detail the material presented in the WHO background documents for each of these toxic substances. In some cases, these WHO background documents use literature reviews that do not take into account scientific research published within the last 10 or more years. In addition, there are instances in which standard WHO practices for deriving guidelines are not used; for example, rounding and other mathematical errors are made. According to published meeting reports from the WHO Chemical Aspects Working Group, the WHO has a timetable for revising some of its guidelines for drinking-water quality, but for many of these toxic substances the planned changes are minimal or will be delayed for as long as 5 years. Given the limited nature of the planned WHO revisions to the inorganic toxic substances and the extended timetable for these revisions, we suggest that governments, researchers, and other stakeholders might establish independent recommendations for inorganic toxic substances and possibly other chemicals to proactively protect public health, or at the very least, revert to previous editions of the Guidelines for Drinking-water Quality, which were more protective of public health.

  17. Do we need regional guidelines for breast cancer management in the MENA region? MENA Breast Cancer Guidelines project.

    Science.gov (United States)

    Fayed, Reham; Hamza, Dina; Abdallah, Heba; Kelany, Mohamed; Tahseen, Amira; Aref, Adel T

    2017-01-01

    Breast cancer is the most common cancer among females worldwide in general and in the Middle East and the North African region (MENA region) in particular. Management of breast cancer in the MENA region faces a lot of challenges, which include younger age at presentation, aggressive behaviour, lack of national breast screening programmes and lack of reliable data registries as well as socioeconomic factors. These factors make applying the international guidelines for breast cancer management very challenging. The aim of this project is to explore the need for a regional breast cancer guideline as well as to screen the clinical practice of breast cancer management in the MENA region. Three web-based designed surveys were sent to more than 600 oncologists in the MENA region from the period of August 2013 to October 2014. Full descriptive data and information regarding the application of international breast cancer guidelines were collected. The software was using the IP address to prevent duplication of collected data. Descriptive analysis and results were shown as numbers and percentages. During the period of the survey, 104 oncologists responded, representing around an 11% response rate. The majority of replies came from Egypt (59 responses (59%)), followed by Saudi Arabia (ten responses (9.6%)). Fifty-one per cent of responders had more than ten years of experience, and further 31.7% had 5-10 years of experience. Seventy-four per cent were working in governmental hospitals, which is our target sector. There was a major defect in having a genetic counsel unit (78.8% declared an absence of this service), presence of a national breast screening programme (55.8% declared an absence of this service), performing sentinel lymph node biopsy (43.3% declared an absence of this service). The need for regional guidelines for the management of breast cancer was agreed upon by 90.6% of responders. There is a clear need to improve the management of breast cancer in the MENA

  18. 40 CFR 300.440 - Procedures for planning and implementing off-site response actions.

    Science.gov (United States)

    2010-07-01

    ... unless the Remedial Project Manager or OSC assures the proper management of the CERCLA waste samples or... OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Hazardous Substance Response § 300.440... § 300.440(d). (5) Off-site transfers of those laboratory samples and treatability study CERCLA wastes...

  19. Guidelines for Preservation, Conservation, and Restoration of Local History and Local Genealogical Materials.

    Science.gov (United States)

    RQ, 1993

    1993-01-01

    Presents guidelines adopted by the American Library Association (ALA) relating to the preservation, conservation, and restoration of local history and local genealogical materials. Topics addressed include assessing preservation needs; developing a plan; choosing appropriate techniques, including microduplication, photoduplication, electronic…

  20. Put in value of the Santa Teresa Park as a cultural landscape. Project and Ordinance of the Landscape in the General Guidelines of its Master Plan

    Directory of Open Access Journals (Sweden)

    Nair Rosana Sommaruga Montiel

    2018-03-01

    Full Text Available The paper is a summary of the landscape studies developed in the framework of 'Lineamientos generales para el Plan Director del Parque Santa Teresa' (General guidelines for Santa Teresa Park Master Plan, agreement made between the Ministry of Tourism, and the Faculty of Architecture, Design And Urbanism of the University of the Republic between August 2015 and July 2016. The purpose of the Convention is to position the Santa Teresa Park as a "model park" for Uruguay, putting in value its patrimonial, landscape and Environmental characteristics, thus contributing to its tourism and sociocultural promotion. The entire project includes and combines different disciplinary studies as well as external contributions. The Research program “Landscape and Public Space” from the Institute of Design in collaboration with VIDIALAB develops the Characterization and Landscape Assessment of the Park, through studies and proposals on its landscape structures, sociocultural perceptions and the qualification of the visual landscape.