WorldWideScience

Sample records for resources inventory project

  1. The Timber Resource Inventory Model (TRIM): a projection model for timber supply and policy analysis.

    P.L. Tedder; R.N. La Mont; J.C. Kincaid

    1987-01-01

    TRIM (Timber Resource Inventory Model) is a yield table projection system developed for timber supply projections and policy analysis. TRIM simulates timber growth, inventories, management and area changes, and removals over the projection period. Programs in the TRIM system, card-by-card descriptions of required inputs, table formats, and sample results are presented...

  2. An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem. [Spacelab inventory procurement planning

    Schlagheck, R. A.

    1977-01-01

    New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

  3. Constructing a Cross-Domain Resource Inventory: Key Components and Results of the EarthCube CINERGI Project.

    Zaslavsky, I.; Richard, S. M.; Malik, T.; Hsu, L.; Gupta, A.; Grethe, J. S.; Valentine, D. W., Jr.; Lehnert, K. A.; Bermudez, L. E.; Ozyurt, I. B.; Whitenack, T.; Schachne, A.; Giliarini, A.

    2015-12-01

    While many geoscience-related repositories and data discovery portals exist, finding information about available resources remains a pervasive problem, especially when searching across multiple domains and catalogs. Inconsistent and incomplete metadata descriptions, disparate access protocols and semantic differences across domains, and troves of unstructured or poorly structured information which is hard to discover and use are major hindrances toward discovery, while metadata compilation and curation remain manual and time-consuming. We report on methodology, main results and lessons learned from an ongoing effort to develop a geoscience-wide catalog of information resources, with consistent metadata descriptions, traceable provenance, and automated metadata enhancement. Developing such a catalog is the central goal of CINERGI (Community Inventory of EarthCube Resources for Geoscience Interoperability), an EarthCube building block project (earthcube.org/group/cinergi). The key novel technical contributions of the projects include: a) development of a metadata enhancement pipeline and a set of document enhancers to automatically improve various aspects of metadata descriptions, including keyword assignment and definition of spatial extents; b) Community Resource Viewers: online applications for crowdsourcing community resource registry development, curation and search, and channeling metadata to the unified CINERGI inventory, c) metadata provenance, validation and annotation services, d) user interfaces for advanced resource discovery; and e) geoscience-wide ontology and machine learning to support automated semantic tagging and faceted search across domains. We demonstrate these CINERGI components in three types of user scenarios: (1) improving existing metadata descriptions maintained by government and academic data facilities, (2) supporting work of several EarthCube Research Coordination Network projects in assembling information resources for their domains

  4. TRIM timber projections: an evaluation based on forest inventory measurements.

    John R. Mills

    1989-01-01

    Two consecutive timberland inventories collected from permanent plots in the natural pine type in North Carolina were used to evaluate the timber resource inventory model (TRIM). This study compares model predictions with field measurements and examines the effect of inventory data aggregation on the accuracy of projections. Projections were repeated for two geographic...

  5. Projecting Timber Inventory at the Product Level

    Lawrence Teeter; Xiaoping Zhou

    1999-01-01

    Current timber inventory projections generally lack information on inventory by product classes. Most models available for inventory projection and linked to supply analyses are limited to projecting aggregate softwood and hardwood. The research presented describes a methodology for distributing the volume on each FIA (USDA Forest Service Forest Inventory and Analysis...

  6. Base-age invariance and inventory projections

    C. J. Cieszewski; R. L. Bailey; B. E. Borders; G. H. Brister; B. D. Shiver

    2000-01-01

    One of the most important functions of forest inventory is to facilitate management decisions towards forest sustainability based on inventory projections into the future. Therefore, most forest inventories are used for predicting future states of the forests, in modern forestry the most common methods used in inventory projections are based on implicit functions...

  7. Projecting national forest inventories for the 2000 RPA timber assessment.

    John R. Mills; Xiaoping. Zhou

    2003-01-01

    National forest inventories were projected in a study that was part of the 2000 USDA Forest Service Resource Planning Act (RPA) timber assessment. This paper includes an overview of the status and structure of timber inventory of the National Forest System and presents 50-year projections under several scenarios. To examine a range of possible outcomes, results are...

  8. Radioactive waste inventories and projections

    McLaren, L.H.

    1982-11-01

    This bibliography contains information on radioactive waste inventories and projections included in the Department of Energy's Energy Data Base from January 1981 through September 1982. The arrangement is by report number for reports, followed by nonreports in reverse chronological order. These citations are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes, each preceded by a brief description, are provided: Corporate Author, Personal Author, Subject, Contract Number, and Report Number. (25 abstracts)

  9. Current Resource Imagery Projects

    Farm Service Agency, Department of Agriculture — Map showing coverage of current Resource imagery projects. High resolution/large scale Resource imagery is typically acquired for the U.S. Forest Service and other...

  10. Inventory of Canadian marine renewable energy resources

    Cornett, A. [National Research Council of Canada, Ottawa, ON (Canada). Canadian Hydraulics Centre; Tarbotton, M. [Triton Consultants Ltd., Vancouver, BC (Canada)

    2006-07-01

    The future development of marine renewable energy sources was discussed with reference to an inventory of both wave energy and tidal current resources in Canada. Canada is endowed with rich potential in wave energy resources which are spatially and temporally variable. The potential offshore resource is estimated at 37,000 MW in the Pacific and 145,000 MW in the Atlantic. The potential nearshore resource is estimated at 9,600 MW near the Queen Charlotte Islands, 9,400 MW near Vancouver Island, 1,000 MW near Sable Island, and 9,000 MW near southeast Newfoundland. It was noted that only a fraction of the potential wave energy resource is recoverable and further work is needed to delineate important local variations in energy potential close to shore. Canada also has rich potential in the tidal resource which is highly predictable and reliable. The resource is spatially and temporally variable, with 190 sites in Canada with an estimated 42,200 MW; 89 sites in British Columbia with an estimated 4,000 MW; and, 34 sites in Nunavut with an estimated 30,500 MW. It was also noted that only a fraction of the potential tidal resource is recoverable. It was suggested that the effects of energy extraction should be evaluated on a case-by-case basis for both wave and tidal energy. This presentation provided a site-by site inventory as well as an analysis of buoy measurements and results from wind-wave hindcasts and tide models. Future efforts will focus on wave modelling to define nearshore resources; tidal modelling to fill gaps and refine initial estimates; assessing impacts of energy extraction at leading sites; and developing a web-enabled atlas of marine renewable energy resources. The factors not included in this analysis were environmental impacts, technological developments, climate related factors, site location versus power grid demand, hydrogen economy developments and economic factors. tabs., figs.

  11. VT County National Resources Inventory Data 1982-1997

    Vermont Center for Geographic Information — (Link to Metadata) This collection provides tabular USDA - Natural Resource Conservation Service (NRCS), National Resources Inventory (NRI) data (1982-1997), by...

  12. Radwaste inventories and projections: an overview

    Notz, K.J.

    1982-07-01

    The Integrated Data Base program was set up to provide fully integrated and reconciled inventories, characteristics, and projections for spent nuclear fuel and all categories of radioactive waste. Eight summary papers, six of which were presented at an ANS special session in Los Angeles in June 1982, are included in this report: data base needs and functions: national planning; integrated data base for spent fuel and radwaste: inventories; integrated data base projections; RAWSYM: radioactive waste management system; NWTS program waste projection data needs; low-level waste management data base system; waste sludge composition at the Savannah River Plant; and summary of characteristics of transuranic waste found at DOE sites

  13. Spent fuel and waste inventories and projections

    Carter, W.L.; Finney, B.C.; Alexander, C.W.; Blomeke, J.O.; McNair, J.M.

    1980-08-01

    Current inventories of commercial spent fuels and both commercial and US Department of Energy radioactive wastes were compiled, based on judgments of the most reliable information available from Government sources and the open literature. Future waste generation rates and quantities to be accumulated over the remainder of this century are also presented, based on a present projection of US commercial nuclear power growth and expected defense-related activities. Spent fuel projections are based on the current DOE/EIA estimate of nuclear growth, which projects 180 GW(e) in the year 2000. It is recognized that the calculated spent fuel discharges are probably high in view of recent reactor cancellations; hence adjustments will be made in future updates of this report. Wastes considered, on a chapter-by-chapter basis, are: spent fuel, high-level wastes, transuranic wastes, low-level wastes, mill tailings (active sites), and remedial action wastes. The latter category includes mill tailings (inactive sites), surplus facilities, formerly utilized sites, and the Grand Junction Project. For each category, waste volume inventories and projections are given through the year 2000. The land usage requirements are given for storage/disposal of low-level and transuranic wastes, and for present inventories of mill tailings

  14. Projecting other public inventories for the 2005 RPA timber assessment update.

    Xiaoping Zhou; John R. Mills; Richard W. Haynes

    2007-01-01

    This study gives an overview of the current inventory status and the projection of future forest inventories on other public timberland. Other public lands are lands administered by state, local, and federal government but excluding National Forest System lands. These projections were used as part of the 2005 USDA Forest Service Resource Planning Act timber assessment...

  15. The ABAG biogenic emissions inventory project

    Carson-Henry, C. (Editor)

    1982-01-01

    The ability to identify the role of biogenic hydrocarbon emissions in contributing to overall ozone production in the Bay Area, and to identify the significance of that role, were investigated in a joint project of the Association of Bay Area Governments (ABAG) and NASA/Ames Research Center. Ozone, which is produced when nitrogen oxides and hydrocarbons combine in the presence of sunlight, is a primary factor in air quality planning. In investigating the role of biogenic emissions, this project employed a pre-existing land cover classification to define areal extent of land cover types. Emission factors were then derived for those cover types. The land cover data and emission factors were integrated into an existing geographic information system, where they were combined to form a Biogenic Hydrocarbon Emissions Inventory. The emissions inventory information was then integrated into an existing photochemical dispersion model.

  16. US Coast Guard national spill response resource inventory

    Giraitis, D.M.

    1993-01-01

    The Oil Pollution Act of 1990 (OPA 90) mandated the establishment of a National Response Unit, now renamed the National Strike Force Coordination Center (NSFCC). Among the duties OPA 90 assigned to this new Coast Guard unit was to compile and maintain a comprehensive list of spill removal resources, personnel, and equipment that is available to Federal and State agencies and to the public. The Coast Guard's Research and Development Center has been developing this project, the Response Resource Inventory (RRI), for one year. The RRI is expected to be operational, with resource data from industry in the data base, by the time of the International Oil Spill Conference in March 1993. The RRI will contain data on skimmers, specialized oil recovery vessels, oil/water separators, dispersants and delivery systems, etc. Previous attempts to maintain a national data base of these response resources, including an earlier Coast Guard system called the Spill Cleanup Equipment Inventory System (SKIM), fell into disuse for a number of reasons. Inaccuracies caused by inadvertent double counting of equipment and outdated information coupled with difficulties in accessing the information were common shortfalls of early systems. During the development of the RRI, user-group meetings were held to determine system requirements and study the failures of previous systems. Methods of obtaining and entering data were a major concern during RRI development. A data collection system that supplies the resource holder with a DOS-formatted diskette containing a collection program will be used. The program will make extensive use of pick lists to minimize the data entry burden on the resource holder and maintain standard entries. When the program is completed, the diskette will be mailed to the NSFCC, where the data will be transferred quickly to the RRI data base. Easy access to the data for the public and industry will be afforded mainly through a computer bulletin board

  17. An Inventory of Foreign Language Cultural Resources.

    Steele, Winifred H.

    The results of a survey of cultural resources available to high school foreign language students in the Central New Jersey and New York City areas are presented in a listing of cultural and professional organizations, businesses, schools, government tourist offices, television and radio broadcasts, publications, religious groups, travel agents,…

  18. Cultural Resources Survey and Archeological Inventory of the Proposed Carrollton Revetment Project, Orleans Parish, Louisiana, Phase 1. Volume 1 of 2

    2004-11-01

    The proposed project area has a humid sub- kin ash (Fraxinus profunda ), green ash (Frax- tropical climate with prevailing southerly winds. inus...leans on June 27, 1967, is 39’ (1020 F) (Magill Salix nigra Black willow 1990:6; Trahan 1989; Peters and Beall 2002). Fraxinus profunda Pumpkin ash...In addition, the Internet radio show "New bait blue glass jar embossed "BROM... /EM...," Orleans Nostalgia" references radio advertise- refers to a

  19. Cultural Resource Inventory of Lands in and Adjacent to the City of Rochester, Minnesota Flood Control Project on the South Fork Zumbro River,

    1981-09-14

    the area directly east of present- day Rochester contained fire-maintained oak openings and barrens . This area consisted of oak groves or single trees...Archaeological Survey of Lands Adjacent to the Pine River Reservoir; University of Minnesota and St. Paul District Corps of Engineers; Archaeological Field...Archaeological Field Services, Inc.; Principal Investigator. 1980 An Archaeological Reconnaissance Survey of the Harrison Hills Project, Plymouth , Hennepin

  20. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 3. Mid-Continent region

    None

    1979-07-01

    The US Corps of Engineers' assessment of the nation's hydroelectric resources provides a current and comprehensive estimate of the potential for incremental or new generation at existing dams and other water resource projects, as well as for undeveloped sites in the US. The demand for hydroelectric power is addressed and various related policy and technical considerations are investigated to determine the incentives, constraints, and impacts of developing hydropower to meet a portion of the future energy demands. The comprehensive data represent the effort of the Corps of Engineers based on site-specific analysis and evaluation. Summary tables include estimates of the potential capacity and energy at each site in the inventory. The number of sites and potential capacity in each state are identified, but specific detailed information is included for sites in Colorado, Kansas, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, and Wyoming.

  1. Mongolia wind resource assessment project

    Elliott, D.; Chadraa, B.; Natsagdorj, L.

    1998-01-01

    The development of detailed, regional wind-resource distributions and other pertinent wind resource characteristics (e.g., assessment maps and reliable estimates of seasonal, diurnal, and directional) is an important step in planning and accelerating the deployment of wind energy systems. This paper summarizes the approach and methods being used to conduct a wind energy resource assessment of Mongolia. The primary goals of this project are to develop a comprehensive wind energy resource atlas of Mongolia and to establish a wind measurement program in specific regions of Mongolia to identify prospective sites for wind energy projects and to help validate some of the wind resource estimates. The Mongolian wind resource atlas will include detailed, computerized wind power maps and other valuable wind resource characteristic information for the different regions of Mongolia

  2. Digital Soil Resource Inventories: Status and Prospects in 2015.

    Rossiter, David

    2016-01-01

    Eleven years ago, the author published a paper (Soil Use and Management 20(3): 296–301) titled “Digital soil resource inventories: status and prospects,” which concluded that, at the time, the quantity and quality of digital soil survey information at global, national, regional, and local scales was

  3. ICPP water inventory study project summary report

    Richards, B.T.

    1994-01-01

    The Idaho Chemical Processing Plant (ICPP) Water inventory Study was initiated in September 1993 with the formation of a joint working group consisting of representatives from DOE-ID, State of Idaho INEL Oversight Program, US Geological Survey, and INEL employees to investigate three issues that had been identified by the INEL Oversight Program at ICPP: (1) the water inventory imbalance at ICPP, (2) the source of water infiltrating into the Tank Farm vault sumps, and (3) the source of water providing potential recharge to perched water bodies underlying ICPP. These issues suggested that water was being lost from the ICPP distribution system. The INEL Oversight Program was concerned that the unaccounted for water at ICPP could be spreading contaminants that have been released over the past 40 years of operations of ICPP, possibly to the Snake River Plain Aquifer. This report summarizes the findings of each of the component investigations that were undertaken to resolve each of the three issues. Concerns about the risk of spreading contaminants will be resolved as part of the Remedial Investigation/Feasibility Study being undertaken at ICPP in compliance with the Federal Facility Agreement and Consent Order between DOE-H), EPA, and the State of Idaho. This report will be a key input to that study

  4. CINERGI: Community Inventory of EarthCube Resources for Geoscience Interoperability

    Zaslavsky, Ilya; Bermudez, Luis; Grethe, Jeffrey; Gupta, Amarnath; Hsu, Leslie; Lehnert, Kerstin; Malik, Tanu; Richard, Stephen; Valentine, David; Whitenack, Thomas

    2014-05-01

    Organizing geoscience data resources to support cross-disciplinary data discovery, interpretation, analysis and integration is challenging because of different information models, semantic frameworks, metadata profiles, catalogs, and services used in different geoscience domains, not to mention different research paradigms and methodologies. The central goal of CINERGI, a new project supported by the US National Science Foundation through its EarthCube Building Blocks program, is to create a methodology and assemble a large inventory of high-quality information resources capable of supporting data discovery needs of researchers in a wide range of geoscience domains. The key characteristics of the inventory are: 1) collaboration with and integration of metadata resources from a number of large data facilities; 2) reliance on international metadata and catalog service standards; 3) assessment of resource "interoperability-readiness"; 4) ability to cross-link and navigate data resources, projects, models, researcher directories, publications, usage information, etc.; 5) efficient inclusion of "long-tail" data, which are not appearing in existing domain repositories; 6) data registration at feature level where appropriate, in addition to common dataset-level registration, and 7) integration with parallel EarthCube efforts, in particular focused on EarthCube governance, information brokering, service-oriented architecture design and management of semantic information. We discuss challenges associated with accomplishing CINERGI goals, including defining the inventory scope; managing different granularity levels of resource registration; interaction with search systems of domain repositories; explicating domain semantics; metadata brokering, harvesting and pruning; managing provenance of the harvested metadata; and cross-linking resources based on the linked open data (LOD) approaches. At the higher level of the inventory, we register domain-wide resources such as domain

  5. ADP Analysis project for the Human Resources Management Division

    Tureman, Robert L., Jr.

    1993-01-01

    The ADP (Automated Data Processing) Analysis Project was conducted for the Human Resources Management Division (HRMD) of NASA's Langley Research Center. The three major areas of work in the project were computer support, automated inventory analysis, and an ADP study for the Division. The goal of the computer support work was to determine automation needs of Division personnel and help them solve computing problems. The goal of automated inventory analysis was to find a way to analyze installed software and usage on a Macintosh. Finally, the ADP functional systems study for the Division was designed to assess future HRMD needs concerning ADP organization and activities.

  6. Integrating Semantic Information in Metadata Descriptions for a Geoscience-wide Resource Inventory.

    Zaslavsky, I.; Richard, S. M.; Gupta, A.; Valentine, D.; Whitenack, T.; Ozyurt, I. B.; Grethe, J. S.; Schachne, A.

    2016-12-01

    Integrating semantic information into legacy metadata catalogs is a challenging issue and so far has been mostly done on a limited scale. We present experience of CINERGI (Community Inventory of Earthcube Resources for Geoscience Interoperability), an NSF Earthcube Building Block project, in creating a large cross-disciplinary catalog of geoscience information resources to enable cross-domain discovery. The project developed a pipeline for automatically augmenting resource metadata, in particular generating keywords that describe metadata documents harvested from multiple geoscience information repositories or contributed by geoscientists through various channels including surveys and domain resource inventories. The pipeline examines available metadata descriptions using text parsing, vocabulary management and semantic annotation and graph navigation services of GeoSciGraph. GeoSciGraph, in turn, relies on a large cross-domain ontology of geoscience terms, which bridges several independently developed ontologies or taxonomies including SWEET, ENVO, YAGO, GeoSciML, GCMD, SWO, and CHEBI. The ontology content enables automatic extraction of keywords reflecting science domains, equipment used, geospatial features, measured properties, methods, processes, etc. We specifically focus on issues of cross-domain geoscience ontology creation, resolving several types of semantic conflicts among component ontologies or vocabularies, and constructing and managing facets for improved data discovery and navigation. The ontology and keyword generation rules are iteratively improved as pipeline results are presented to data managers for selective manual curation via a CINERGI Annotator user interface. We present lessons learned from applying CINERGI metadata augmentation pipeline to a number of federal agency and academic data registries, in the context of several use cases that require data discovery and integration across multiple earth science data catalogs of varying quality

  7. 7 CFR 767.201 - Real estate inventory property with important resources.

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Real estate inventory property with important... SERVICE AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS INVENTORY PROPERTY MANAGEMENT Real Estate Property With Important Resources or Located in Special Hazard Areas § 767.201 Real estate inventory...

  8. Spent fuel and radioactive waste inventories, projections, and characteristics

    1984-09-01

    Current inventories and characteristics of commercial spent fuels and both commercial and US Department of Energy (DOE) radioactive wastes were compiled through December 31, 1983, based on the most reliable information available from government sources and the open literature, technical reports, and direct contacts. Future waste and spent fuel to be generated over the next 37 years and characteristics of these materials are also presented, consistent with the latest DOE/Energy Information Administration (EIA) or projection of US commercial nuclear power growth and expected defense-related and private industrial and institutional activities. Materials considered, on a chapter-by-chapter basis, are: spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, airborne waste, remedial action waste, and decommissioning waste. For each category, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated, based on reported or calculated isotopic compositions. 48 figures, 107 tables

  9. Spent fuel and radioactive-waste inventories, projections, and characteristics

    1982-10-01

    Current inventories and characteristics of commercial spent fuels and both commercial and US Department of Energy radioactive wastes were compiled, based on the most reliable information available from government sources and the open literature, technical reports, and direct contacts. Future waste and spent fuel to be generated over the next 40 years, and characteristics of these materials are also presented, based on a present DOE/EIA projection of US commercial nuclear power growth and expected defense-related and industrial and institutional activities. Materials considered, on a chapter-by-chapter basis, are: spent fuel, high-level waste, transuranic waste, low-level waste, remedial action waste, active uranium mill tailings, airborne waste, and decommissioning. For each category, current and projected inventories are given through the year 2020. The land usage requirements are given for storage/disposal of low-level and transuranic wastes, and for the present inventories of inactive uranium mill tailings. For each waste category the radioactivity and thermal power are calculated. Isotopic compositions and cost data are given for each waste type and for spent fuel

  10. Uranium Resources Inventory at Jumbang III West Kalimantan Systematic Prospection

    Soetopo, B; Wusana Y; Paimin; Sudjiman, FX

    1998-01-01

    Systematic prospection at jumbang III sector, west kalimantan has been carried out for identifying characteristic occurrence of the U mineralization and inventorying U resources potential area. The investigation has been based on U indication discovered in the form of a radiometric anomaly outcrop as high as 9000c/s. The possibility the U occurrence potential at the investigated may be resulted from granitic magma intrusion which produced an allogeneic type of uranium controlled by tectonic force. The method of the investigation includes systematic geological mapping and the result of the investigation shows that the lithology at the area is metamorphic rocks, intruded by biotite granite and dyke biotite adamelite and kersantite. Geological structure is NE-SW N-S and ESE- WNW strike slip faults. The uranium mineralization includes uraninite associated with magnetite, ilmenite, pyrite, pyrhotite, molybdenite, chalcopyrite, rutile, tourmaline, and quarts by magmatic hydrothermal process of allogeneic type U. The total U content of rock area is 7,57-4197,67 ppm U potential of the estimation result is 187.920 ton reserve and 25.3812 ton metallic U

  11. One project's waste is another project's resource

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  12. Electronic Resources Management Project Presentation 2012

    Ramli, Rindra M.

    2012-01-01

    This presentation describes the electronic resources management project undertaken by the KAUST library. The objectives of this project is to migrate information from MS Sharepoint to Millennium ERM module. One of the advantages of this migration

  13. Spent fuel and radioactive waste inventories, projections, and characteristics

    1983-09-01

    Current inventories and characteristics of commercial spent fuels and both commercial and US Department of Energy radioactive wastes were compiled through December 31, 1982, based on the most reliable information available from government sources and the open literature, technical reports, and direct contacts. Future waste and spent fuel to be generated over the next 40 years and characteristics of these materials are also presented, based on the latest DOE/EIA projection of US commercial nuclear power growth and expected defense-related and industrial and institutional activities. Materials considered, on a chapter-by-chapter bases, are: spent fuel, high-level waste, transuranic waste, low-level waste, active uranium mill tailings, airborne waste, remedial action waste, and decommissioning waste. For each category, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated, based on reported or calculated isotopic compositions. One chapter gives broad, summary data on the costs of spent fuel and radioactive waste management and disposal to provide an economic perspective. This chapter is not intended as a definitive guide, but it is a source of reasonable, order-of-magnitude costs and also provides references to more-detailed and scenario-specific studies. An appendix on generic flowsheets and source terms used for the projections is also included

  14. Electronic Resources Management Project Presentation 2012

    Ramli, Rindra M.

    2012-11-05

    This presentation describes the electronic resources management project undertaken by the KAUST library. The objectives of this project is to migrate information from MS Sharepoint to Millennium ERM module. One of the advantages of this migration is to consolidate all electronic resources into a single and centralized location. This would allow for better information sharing among library staff.

  15. Mexico Wind Resource Assessment Project

    Schwartz, M.N.; Elliott, D.L.

    1995-05-01

    A preliminary wind energy resource assessment of Mexico that produced wind resource maps for both utility-scale and rural applications was undertaken as part of the Mexico-U.S. Renewable Energy Cooperation Program. This activity has provided valuable information needed to facilitate the commercialization of small wind turbines and windfarms in Mexico and to lay the groundwork for subsequent wind resource activities. A surface meteorological data set of hourly data in digital form was utilized to prepare a more detailed and accurate wind resource assessment of Mexico than otherwise would have been possible. Software was developed to perform the first ever detailed analysis of the wind characteristics data for over 150 stations in Mexico. The hourly data set was augmented with information from weather balloons (upper-air data), ship wind data from coastal areas, and summarized wind data from sources in Mexico. The various data were carefully evaluated for their usefulness in preparing the wind resource assessment. The preliminary assessment has identified many areas of good-to-excellent wind resource potential and shows that the wind resource in Mexico is considerably greater than shown in previous surveys.

  16. Front Range Infrastructure Resources Project: water-resources activities

    Robson, Stanley G.; Heiny, Janet S.

    1998-01-01

    Infrastructure, such as roads, buildings, airports, and dams, is built and maintained by use of large quantities of natural resources such as aggregate (sand and gravel), energy, and water. As urban area expand, local sources of these resource are becoming inaccessible (gravel cannot be mined from under a subdivision, for example), or the cost of recovery of the resource becomes prohibitive (oil and gas drilling in urban areas is costly), or the resources may become unfit for some use (pollution of ground water may preclude its use as a water supply). Governmental land-use decision and environmental mandates can further preclude development of natural resources. If infrastructure resources are to remain economically available. current resource information must be available for use in well-reasoned decisions bout future land use. Ground water is an infrastructure resource that is present in shallow aquifers and deeper bedrock aquifers that underlie much of the 2,450-square-mile demonstration area of the Colorado Front Range Infrastructure Resources Project. In 1996, mapping of the area's ground-water resources was undertaken as a U.S. Geological Survey project in cooperation with the Colorado Department of Natural Resources, Division of Water Resources, and the Colorado Water Conservation Board.

  17. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 1. Pacific Northwest region

    None

    1979-07-01

    The preliminary inventory and analysis procedures provide a comprehensive assessment of the undeveloped hydroelectric power potential in the US and determines which sites merit more thorough investigation. Over 5400 existing structures have been identified as having the physical potential to add hydropower plants or increase hydropower output thereby increasing our present hydropower capacity from a total of 64,000 MW to 158,000 MW and our energy from 280,000 GWH to 503,000 GWH. While the physical potential for this increase is clearly available, some of these projects will undoubtedly not satisfy more-detailed economic analysis as well as the institutional and environmental criteria which will be imposed upon them. Summary tables include estimates of the potential capacity and energy at each site in the inventory. In some cases, individual projects may be site alternatives to others in the same general location, when only one can be considered for hydropower development. The number of sites per state is identified, but specific information is included for only the sites in Alaska, Idaho, Oregon, and Washington in this first volume.

  18. Statistical Strategy for Inventorying and Monitoring the Ecosystem Resources of the State of Jalisco at Multiple Scales and Resolution Levels

    Robin M. Reich; Hans T. Schreuder

    2006-01-01

    The sampling strategy involving both statistical and in-place inventory information is presented for the natural resources project of the Green Belt area (Centuron Verde) in the Mexican state of Jalisco. The sampling designs used were a grid based ground sample of a 90x90 m plot and a two-stage stratified sample of 30 x 30 m plots. The data collected were used to...

  19. Resource Roads demonstration project : final report

    NONE

    2009-07-15

    British Columbia's vast network of resource roads are considered to be amongst the most dangerous, high-risk workplaces in the province. Resource roads, also known as industrial roads, forest service roads, or petroleum development roads, present several unique safety challenges as workplaces. They are built for the purpose of access, egress and transport of materials, resources, equipment and people. However, the lack the same diligence of enforcement and a consistent design, construction, maintenance and standard for use as public highways or municipal roads. There are also safety challenges related to public use of resource roads. This report presented a project, called ResourceRoads by WorkSafe BC that focused on the organization and implementation of a management structure that would provide a system of coordination and a process of compliance for the users of the defined road systems. The project was based on information gathered in two forest districts of Prince George and the South Peace Forest Districts. A committee consisting of the actual owner of the road and other users was formed. The report presented a history of British Columbia's resource road system, and discussed resource roads as industrial workplaces and worksites, as well as resource road fatality statistics. The demonstration project was outlined in terms of project leadership; scope; strategic objectives; project purpose; performance objectives; project communication; demonstration areas; and project stages. Project fundamentals and project findings were also presented along with recommendations and responses to the Auditor General report and the Forest Safety Ombudsman report. It was concluded that potential uses of new technologies for resource road vehicles should be reviewed. tabs., figs.

  20. Phase I Cultural Resources Survey and Archeological Inventory of the Segura Staging Area, Iberia Parish, Louisiana

    2003-01-01

    This document presents the results of a Phase I cultural resources survey and archeological inventory of the Segura Staging Area located on the right descending bank of Bayou Teche at approximate River Mile...

  1. Scheduling of resource-constrained projects

    Klein, Robert

    2000-01-01

    Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practiti...

  2. Canada's forest biomass resources: deriving estimates from Canada's forest inventory

    Penner, M.; Power, K.; Muhairwe, C.; Tellier, R.; Wang, Y.

    1997-01-01

    A biomass inventory for Canada was undertaken to address the data needs of carbon budget modelers, specifically to provide estimates of above-ground tree components and of non-merchantable trees in Canadian forests. The objective was to produce a national method for converting volume estimates to biomass that was standardized, repeatable across the country, efficient and well documented. Different conversion methods were used for low productivity forests (productivity class 1) and higher productivity forests (productivity class 2). The conversion factors were computed by constructing hypothetical stands for each site, age, species and province combination, and estimating the merchantable volume and all the above-ground biomass components from suitable published equations. This report documents the procedures for deriving the national biomass inventory, and provides illustrative examples of the results. 46 refs., 9 tabs., 5 figs

  3. Timber resource statistics for the Yakataga inventory unit, Alaska, 1976.

    Willem W.S. van Hees

    1985-01-01

    Statistics on forest area, total gross and net timber volumes, and annual net growth and mortality are presented from the 1976 timber inventory of the Yakataga unit, Alaska. Timberland area is estimated at 209.3 thousand acres (84.7 thousand ha), net growing stock volume at 917.1 million cubic feet (26.0 million m3), and annual net growth and...

  4. Phase I Marine and Terrestrial Cultural Resources Survey of 13 Project Items Located on Marsh Island, Iberia Parish, Louisiana

    Barr, William

    1999-01-01

    This report presents the results of Phase I cultural resources survey and archeological inventory of two marine and 11 terrestrial project items on and near Marsh Island in Iberia Parish, Louisiana...

  5. An integrated GIS/remote sensing data base in North Cache soil conservation district, Utah: A pilot project for the Utah Department of Agriculture's RIMS (Resource Inventory and Monitoring System)

    Wheeler, D. J.; Ridd, M. K.; Merola, J. A.

    1984-01-01

    A basic geographic information system (GIS) for the North Cache Soil Conservation District (SCD) was sought for selected resource problems. Since the resource management issues in the North Cache SCD are very complex, it is not feasible in the initial phase to generate all the physical, socioeconomic, and political baseline data needed for resolving all management issues. A selection of critical varables becomes essential. Thus, there are foud specific objectives: (1) assess resource management needs and determine which resource factors ae most fundamental for building a beginning data base; (2) evaluate the variety of data gathering and analysis techniques for the resource factors selected; (3) incorporate the resulting data into a useful and efficient digital data base; and (4) demonstrate the application of the data base to selected real world resoource management issues.

  6. Nationwide Natural Resource Inventory of the Philippines Using Lidar: Strategies, Progress, and Challenges

    Blanco, A. C.; Tamondong, A.; Perez, A. M.; Ang, M. R. C.; Paringit, E.; Alberto, R.; Alibuyog, N.; Aquino, D.; Ballado, A.; Garcia, P.; Japitana, M.; Ignacio, M. T.; Macandog, D.; Novero, A.; Otadoy, R. E.; Regis, E.; Rodriguez, M.; Silapan, J.; Villar, R.

    2016-06-01

    The Philippines has embarked on a detailed nationwide natural resource inventory using LiDAR through the Phil-LiDAR 2 Program. This 3-year program has developed and has been implementing mapping methodologies and protocols to produce high-resolution maps of agricultural, forest, coastal marine, hydrological features, and renewable energy resources. The Program has adopted strategies on system and process development, capacity building and enhancement, and expanding the network of collaborations. These strategies include training programs (on point cloud and image processing, GIS, and field surveys), workshops, forums, and colloquiums (program-wide, cluster-based, and project-based), and collaboration with partner national government agencies and other organizations. In place is a cycle of training, implementation, and feedback in order to continually improve the system and processes. To date, the Program has achieved progress in the development of workflows and in rolling out products such as resource maps and GIS data layers, which are indispensable in planning and decision-making. Challenges remains in speeding up output production (including quality checks) and in ensuring sustainability considering the short duration of the program. Enhancements in the workflows and protocols have been incorporated to address data quality and data availability issues. More trainings have been conducted for project staff hired to address human resource gaps. Collaborative arrangements with more partners are being established. To attain sustainability, the Program is developing and instituting a system of training, data updating and sharing, information utilization, and feedback. This requires collaboration and cooperation of the government agencies, LGUs, universities, other organizations, and the communities.

  7. Use of isotope techniques in water resources inventory planning and development

    1979-01-01

    The seminar, sponsored jointly by the IAEA, UNESCO, and WHO, was organized by the Isotope Hydrology Section for hydrologists and hydrogeologists from English-speaking African countries who have primary administrative and technical responsibility in planning, implementing, and supervising programmes in the field of water resources in their countries. The aim of the seminar was to discuss and to inform the participants of both the theoretical and applied aspects of isotope techniques in hydrology and their potential use in studies dealing with water resources inventory, planning, and development. A similar regional seminar was organized in 1973 by the IAEA in Mexico City for Latin- American countries. In 1979, such a seminar will be held for French-speaking African countries. The Nairobi seminar was held at the East African Institute for Meteorological Training and Research. It was opened by the Minister for Water Development of the Kenyan Government, Dr. Gikonyo Kiano, who stressed the importance of water development problems in the African region and who appreciated the IAEA/UNESCO/WHO initiative in holding the seminar on isotope techniques in water resources in Nairobi. The programme of seminar lectures and discussions included the following topics. 1 Basic principles of radioisotope techniques and stable isotope ratios in hydrology 2. Tritium and radiocarbon as environmental tracers for dating water bodies 3 Isotope techniques in studying the origin of groundwater, recharge, and flow of groundwater. 4. Isotope techniques for identification of surface and groundwater relationships. 5 Surface water studies including lake dynamics, discharge measurements and sediment transport 6. Isotope methods in aquifer characteristics. 7 Isotope methods in geothermal resources prospecting. 8. Isotope techniques in hydraulics engineering. Each topic was illustrated with detailed descriptions of case studies During discussions, participants presented important problems (of water

  8. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  9. State-of-the-art techniques for inventory of Great Lakes aquatic habitats and resources

    Edsall, Thomas A.; Brock, R.H.; Bukata, R.P.; Dawson, J.J.; Horvath, F.J.; Busch, W.-Dieter N.; Sly, Peter G.

    1992-01-01

    This section of the Classification and Inventory of Great Lakes Aquatic Habitat report was prepared as a series of individually authored contributions that describe, in various levels of detail, state-of-the-art techniques that can be used alone or in combination to inventory aquatic habitats and resources in the Laurentian Great Lakes system. No attempt was made to review and evaluate techniques that are used routinely in limnological and fisheries surveys and inventories because it was felt that users of this document would be familiar with them.

  10. Nevada test site radionuclide inventory and distribution: project operations plan

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  11. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 2. Pacific Southwest region

    None

    1979-07-01

    The estimates of existing, incremental, and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Pacific Southwest region, the maximum physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy greater than 85,000 GWH. By comparison, these values represent about 6% of the total potential capacity and hydroelectric energy generation estimated for the entire US. Of the total capacity estimated for the region, 9900 MW has been installed. The remainder (23,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (6000 MW) and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (17,200 MW). Small-scale facilities account for less than 4% of the region's total installed capacity, but another 600 MW could be added to these and other small water resource projects. In addition, 600 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of California and Utah having the largest potential for incremental development at existing projects in the Pacific Southwest region. States comprising the Southwest are Arizona, California, Hawaii, Nevada, and Utah.

  12. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 6. Northeast region

    None

    1979-07-01

    In the Northeast region, the physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy of some 153,000 GWH. By comparison, the available data represent about 6% of the total capacity and 11% of the hydroelectric energy potential estimated for the entire US. Of the total capacity estimated for the region, 6100 MW has been installed. The remainder (27,200 MW, excluding the undeveloped capacity in the New England States) is the maximum which could be developed by upgrading and expanding existing projects (18,700 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (8500 MW). Small-scale facilities account for about 15% of the region's total installed capacity, but another 1800 MW could be added to these and other small water-resource projects. In addition, 500 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of New York, Maine, and New Hampshire having the largest potential for incremental development at existing projects in the Northeast region. West Virginia, Maryland, Delaware, New Jersey, Pennsylvania, New York, Connecticut, Massachusetts, Rhode Island, New Hampshire, Vermont, and Maine comprise the Northeast region.

  13. Aniakchak National Monument and Preserve: Geologic resources inventory report

    Hults, Chad P.; Neal, Christina

    2015-01-01

    This GRI report is a companion document to previously completed GRI digital geologic map data. It was written for resource managers to support science-informed decision making. It may also be useful for interpretation. The report was prepared using available geologic information, and the NPS Geologic Resources Division conducted no new fieldwork in association with its preparation. Sections of the report discuss distinctive geologic features and processes within the park, highlight geologic issues facing resource managers, describe the geologic history leading to the present-day landscape, and provide information about the GRI geologic map data. A poster illustrates these data. The Map Unit Properties Table summarizes report content for each geologic map unit.

  14. The resource soil in Colombia - Inventory and problematic

    Malagon Castro; Dimas

    1998-01-01

    Soil survey studies as performed in Colombia, sintethize geographical knowledge both of the natural resource and the land as such. This holistic approach integrals geomorphology, climate, petrography-sediment logy, soils, land cover and land use. The Colombian geographic institute has performed these studies for the last five decades. This article initially summarizes the historical development of Colombian soil survey, continues with the Colombian soil resource knowledge and its application through land interpretative classifications, land use conflicts, soil degradation aspects and Colombian land zonifications. The final discussion emphasizes soil survey issues and perspective

  15. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  16. Renewable energy resource and technology assessment: Southern Tier Central Region, New York, New York. Renewable Energy Resource Inventory; renewable energy technology handbook; technology assessment workbook

    1978-12-01

    The Renewable Energy Resource Inventory contains regional maps that record the location of renewable energy resources such as insolation, wind, biomass, and hydropower in the Southern Tier Central Region of New York State. It contains an outline of a process by which communities can prepare local renewable energy resource inventories using maps and overlays. The process starts with the mapping of the resources at a regional scale and telescopes to an analysis of resources at a site-specific scale. The resource inventory presents a site analysis of Sullivan Street Industrial Park, Elmira, New York.

  17. Inventory and surveillance of natural resources as a contribution to land utilization planning in the Sahel

    Panzer, K F

    1980-09-01

    The destructive land-use practices observed in large parts of the Sahel of West-Africa as a consequence of increasing population pressure must be replaced by sustained-yield management, e.g., by agro-sylvo-pastoral land-use systems. Information and planning aids required can only be obtained through the inventory and subsequent monitoring of the natural, renewable resources, i.e. water, range- and wood lands. Because of the extent and inaccessibility of the Sahel, an inventory design combining clustered fieldplots and large-scale aerial photography is being considered as most efficient in statistical and economical terms. Evidently, an inventory cannot solve the serious problems in the Sahel, but its results can contribute essentially towards defining better land-use policies and towards more effective management of the natural resource base.

  18. A sense inventory for clinical abbreviations and acronyms created using clinical notes and medical dictionary resources.

    Moon, Sungrim; Pakhomov, Serguei; Liu, Nathan; Ryan, James O; Melton, Genevieve B

    2014-01-01

    To create a sense inventory of abbreviations and acronyms from clinical texts. The most frequently occurring abbreviations and acronyms from 352,267 dictated clinical notes were used to create a clinical sense inventory. Senses of each abbreviation and acronym were manually annotated from 500 random instances and lexically matched with long forms within the Unified Medical Language System (UMLS V.2011AB), Another Database of Abbreviations in Medline (ADAM), and Stedman's Dictionary, Medical Abbreviations, Acronyms & Symbols, 4th edition (Stedman's). Redundant long forms were merged after they were lexically normalized using Lexical Variant Generation (LVG). The clinical sense inventory was found to have skewed sense distributions, practice-specific senses, and incorrect uses. Of 440 abbreviations and acronyms analyzed in this study, 949 long forms were identified in clinical notes. This set was mapped to 17,359, 5233, and 4879 long forms in UMLS, ADAM, and Stedman's, respectively. After merging long forms, only 2.3% matched across all medical resources. The UMLS, ADAM, and Stedman's covered 5.7%, 8.4%, and 11% of the merged clinical long forms, respectively. The sense inventory of clinical abbreviations and acronyms and anonymized datasets generated from this study are available for public use at http://www.bmhi.umn.edu/ihi/research/nlpie/resources/index.htm ('Sense Inventories', website). Clinical sense inventories of abbreviations and acronyms created using clinical notes and medical dictionary resources demonstrate challenges with term coverage and resource integration. Further work is needed to help with standardizing abbreviations and acronyms in clinical care and biomedicine to facilitate automated processes such as text-mining and information extraction.

  19. Estimation of forest resources from a country wide laser scanning survey and national forest inventory data

    Nord-Larsen, Thomas; Schumacher, Johannes

    2012-01-01

    Airborne laser scanning may provide a means for assessing local forest biomass resources. In this study, national forest inventory (NFI) data was used as reference data for modeling forest basal area, volume, aboveground biomass, and total biomass from laser scanning data obtained in a countrywid...

  20. HALL project. Justifying synthesis of the dimensioning inventory model

    Lagrange, M.H.

    2003-01-01

    This document explains the input data and the hypotheses retained for the establishment of the dimensioning inventory model (DIM). It recalls, first, the scenarios considered for the spent fuel and reprocessing management, describes the updating of the list of families of high-activity and long living (HALL) waste packages and the hypotheses considered for their quantifying in the inventory model. It presents also the selection criteria of type-packages and the list of such packages. It precises the regrouping of package families into type-packages and the related quantitative data. Finally, it details the modalities of preparation of radiological and chemical description of type-packages. (J.S.)

  1. STATEWIDE INVENTORIES OF HERITAGE RESOURCES: MACRIS AND THE EXPERIENCE IN MASSACHUSETTS

    P. H. Stott

    2017-08-01

    Full Text Available The Massachusetts Historical Commission (MHC is the State Historic Preservation Office for Massachusetts. Established in 1963, MHC has been inventorying historic properties for over half a century. Since 1987, it has maintained a heritage database, the Massachusetts Cultural Resource Information System, or MACRIS. Today MACRIS holds over 206,000 records from the 351 towns and cities across the Commonwealth. Since 2004, a selection of the more than 150 MACRIS fields has been available online at mhcmacris. net. MACRIS is widely used by independent consultants preparing project review files, by MHC staff in its regulatory responsibilities, by local historical commissions monitoring threats to their communities, as well as by scholars, historical organizations, genealogists, property owners, reporters, and the general public interested in the history of the built environment. In 2016 MACRIS began migration off of its three-decade old Pick multivalue database to SQL Server, and in 2017, the first redesign of its thirteen-year old web interface should start to improve usability. Longer-term improvements have the goal of standardizing terminology and ultimately bringing interoperability with other heritage databases closer to reality.

  2. Statewide Inventories of Heritage Resources: Macris and the Experience in Massachusetts

    Stott, P. H.

    2017-08-01

    The Massachusetts Historical Commission (MHC) is the State Historic Preservation Office for Massachusetts. Established in 1963, MHC has been inventorying historic properties for over half a century. Since 1987, it has maintained a heritage database, the Massachusetts Cultural Resource Information System, or MACRIS. Today MACRIS holds over 206,000 records from the 351 towns and cities across the Commonwealth. Since 2004, a selection of the more than 150 MACRIS fields has been available online at mhcmacris. net. MACRIS is widely used by independent consultants preparing project review files, by MHC staff in its regulatory responsibilities, by local historical commissions monitoring threats to their communities, as well as by scholars, historical organizations, genealogists, property owners, reporters, and the general public interested in the history of the built environment. In 2016 MACRIS began migration off of its three-decade old Pick multivalue database to SQL Server, and in 2017, the first redesign of its thirteen-year old web interface should start to improve usability. Longer-term improvements have the goal of standardizing terminology and ultimately bringing interoperability with other heritage databases closer to reality.

  3. Distributing Resources in a Construction Project

    Axel, Erik

    2015-01-01

    In the present paper the status of theories are discussed. It will be based on the fact that our understanding comes out of our common activity, and we will take point of departure in some empirical material from a construction project. We shall explore a conception of conflictual cooperation, wh...... that accordingly theories must change with the process, that they are dissolving in praxis. Keywords: arrangement, common cause, concept, conflictual cooperation, contradictions, design of square, praxis, procedure, resources, theory....

  4. e-MIR2: a public online inventory of medical informatics resources.

    de la Calle, Guillermo; García-Remesal, Miguel; Nkumu-Mbomio, Nelida; Kulikowski, Casimir; Maojo, Victor

    2012-08-02

    Over the past years, the number of available informatics resources in medicine has grown exponentially. While specific inventories of such resources have already begun to be developed for Bioinformatics (BI), comparable inventories are as yet not available for the Medical Informatics (MI) field, so that locating and accessing them currently remains a difficult and time-consuming task. We have created a repository of MI resources from the scientific literature, providing free access to its contents through a web-based service. We define informatics resources as all those elements that constitute, serve to define or are used by informatics systems, ranging from architectures or development methodologies to terminologies, vocabularies, databases or tools. Relevant information describing the resources is automatically extracted from manuscripts published in top-ranked MI journals. We used a pattern matching approach to detect the resources' names and their main features. Detected resources are classified according to three different criteria: functionality, resource type and domain. To facilitate these tasks, we have built three different classification schemas by following a novel approach based on folksonomies and social tagging. We adopted the terminology most frequently used by MI researchers in their publications to create the concepts and hierarchical relationships belonging to the classification schemas. The classification algorithm identifies the categories associated with resources and annotates them accordingly. The database is then populated with this data after manual curation and validation. We have created an online repository of MI resources to assist researchers in locating and accessing the most suitable resources to perform specific tasks. The database contains 609 resources at the time of writing and is available at http://www.gib.fi.upm.es/eMIR2. We are continuing to expand the number of available resources by taking into account further

  5. Strategically oriented management and controlling of resource intensive projects

    Kemmeter, Sascha

    2015-01-01

    The book on strategically oriented management and controlling of resource intensive projects covers the following issues: frame of project management and project controlling, classification of the decommissioning of nuclear facilities as resource intensive projects, research design for case studies, results of the study of project management specific characteristics of decommissioning, reference model for the project management of nuclear facility decommissioning.

  6. e-MIR2: a public online inventory of medical informatics resources

    de la Calle Guillermo

    2012-08-01

    Full Text Available Abstract Background Over the past years, the number of available informatics resources in medicine has grown exponentially. While specific inventories of such resources have already begun to be developed for Bioinformatics (BI, comparable inventories are as yet not available for the Medical Informatics (MI field, so that locating and accessing them currently remains a difficult and time-consuming task. Description We have created a repository of MI resources from the scientific literature, providing free access to its contents through a web-based service. We define informatics resources as all those elements that constitute, serve to define or are used by informatics systems, ranging from architectures or development methodologies to terminologies, vocabularies, databases or tools. Relevant information describing the resources is automatically extracted from manuscripts published in top-ranked MI journals. We used a pattern matching approach to detect the resources’ names and their main features. Detected resources are classified according to three different criteria: functionality, resource type and domain. To facilitate these tasks, we have built three different classification schemas by following a novel approach based on folksonomies and social tagging. We adopted the terminology most frequently used by MI researchers in their publications to create the concepts and hierarchical relationships belonging to the classification schemas. The classification algorithm identifies the categories associated with resources and annotates them accordingly. The database is then populated with this data after manual curation and validation. Conclusions We have created an online repository of MI resources to assist researchers in locating and accessing the most suitable resources to perform specific tasks. The database contains 609 resources at the time of writing and is available at http://www.gib.fi.upm.es/eMIR2. We are continuing to expand the number

  7. A sense inventory for clinical abbreviations and acronyms created using clinical notes and medical dictionary resources

    Moon, Sungrim; Pakhomov, Serguei; Liu, Nathan; Ryan, James O; Melton, Genevieve B

    2014-01-01

    Objective To create a sense inventory of abbreviations and acronyms from clinical texts. Methods The most frequently occurring abbreviations and acronyms from 352 267 dictated clinical notes were used to create a clinical sense inventory. Senses of each abbreviation and acronym were manually annotated from 500 random instances and lexically matched with long forms within the Unified Medical Language System (UMLS V.2011AB), Another Database of Abbreviations in Medline (ADAM), and Stedman's Dictionary, Medical Abbreviations, Acronyms & Symbols, 4th edition (Stedman's). Redundant long forms were merged after they were lexically normalized using Lexical Variant Generation (LVG). Results The clinical sense inventory was found to have skewed sense distributions, practice-specific senses, and incorrect uses. Of 440 abbreviations and acronyms analyzed in this study, 949 long forms were identified in clinical notes. This set was mapped to 17 359, 5233, and 4879 long forms in UMLS, ADAM, and Stedman's, respectively. After merging long forms, only 2.3% matched across all medical resources. The UMLS, ADAM, and Stedman's covered 5.7%, 8.4%, and 11% of the merged clinical long forms, respectively. The sense inventory of clinical abbreviations and acronyms and anonymized datasets generated from this study are available for public use at http://www.bmhi.umn.edu/ihi/research/nlpie/resources/index.htm (‘Sense Inventories’, website). Conclusions Clinical sense inventories of abbreviations and acronyms created using clinical notes and medical dictionary resources demonstrate challenges with term coverage and resource integration. Further work is needed to help with standardizing abbreviations and acronyms in clinical care and biomedicine to facilitate automated processes such as text-mining and information extraction. PMID:23813539

  8. Solmap: Project In India's Solar Resource Assessment

    Indradip Mitra

    2014-12-01

    Full Text Available India launched Jawaharlal Nehru National Solar Mission in 2009, which aims to set up 20 000 MW of grid connected solar power, besides 2 000 MW equivalent of off-grid applications and cumulative growth of solar thermal collector area to 20 million m2 by 2022. Availability of reliable and accurate solar radiation data is crucial to achieve the targets. As a result of this initiative, Ministry of New and Renewable Energy (MNRE of Government of India (GoI has awarded a project to Centre for Wind Energy Technology (C-WET, Chennai in the year 2011 to set up 51 Solar Radiation Resource Assessment (SRRA stations using the state-of-the-art equipment in various parts of the country, especially the sites with high potential for solar power. The GoI project has synergy with SolMap project, which is implemented by the Deutsche GesellschaftfürInternationaleZusammenarbeit (GIZ in cooperation with the MNRE. SolMap project is contributing to SRRA project in establishing quality checks on the data obtained as per International protocols and helping data processing to generate investment grade data. The paper highlights the details of SRRA stations and an attempt has been made to present some of the important results of quality control and data analysis with respect to GHI and DNI. While our analysis of the data over one year finds that intensity and profile of the insolation are not uniform across the geographic regions, the variability in DNI is particularly high. Strong influence of monsoon is also identified. SRRA infrastructure aims to develop investment grade solar radiation resource information to assist project activities under the National Solar Mission of India.

  9. The KINDRA H2020 Project: a knowledge inventory for hydrogeology research

    Petitta, Marco; Bodo, Balazs; Caschetto, Mariachiara; Correia, Victor; Cseko, Adrienn; Fernandez, Isabel; Hartai, Eva; Hinsby, Klaus; Madarasz, Tamas; Garcia Padilla, Mercedes; Szucs, Peter

    2015-04-01

    into wider programs generally related to water, environment or ecology. In order to have a comprehensive understanding on the groundwater theme, it is necessary to create a "snapshot" of our scientific knowledge as of 2015/2016 covering as many European countries as possible. Such comprehensive coverage will result in an accurate assessment of the state of the art in hydrogeology research in various geographical and geo-environmental settings, allowing for direct comparison and the exploitation of synergies. The KINDRA project (Knowledge Inventory for hydrogeology research, Grant Agreement No. 642047, www.kindraproject.eu) seeks to create a critical mass for scientific knowledge exchange of hydrogeology research, to ensure wide applicability of research results, including support of innovation and development, and to reduce unnecessary duplication of efforts. KINDRA is funded by the European Commission's HORIZON2020 Framework Programme. The project started on 1 January 2015 with the overall objective to take stock of our contemporary knowledge of hydrogeology with the help of an inventory of research results, activities, projects and programmes, and then use the inventory to identify critical research challenges and gaps, with a view to avoiding overlaps. This approach takes into account the implementation of the WFD and new innovation areas within integrated water resources management, allowing at EU scale the future correct management and policy development of groundwater.

  10. Uranium resource evaluation project quality assurance evaluation

    Grimes, J.G.

    1981-01-01

    This evaluation was conducted over an eight-month period from February 4 through October 1, 1980. During this time, field sampling was suspended for an indefinite time period while the National Uranium Resource Evaluation (NURE) Program underwent restructuring. In addition, the Uranium Resource Evaluation (URE) Project archives are being restructured. Since it is difficult to evaluate quality assurance needs of a program that is undergoing drastic change and because sections of the evaluation were well along before these changes were announced, this evaluation reflects the situation as it was during February 1980. The following quality assurance related programs are continuing to date: (1) periodic checks of field sampling procedures by the Supervising Field Geologist and the Director of Field Operations; (2) verification of field form information and laboratory analytical data verification for all geochemical surveys; (3) URE Project laboratory quality control program (all elements routinely analyzed); and (4) Ames interlaboratory quality control program (uranium only). UCC-ND was given the responsibility of conducting a Hydrogeochemical and Stream Sediment Reconnaissance (HSSR) survey in the Central United States (Illinois, Indiana, Iowa, Kansas, Michigan, Minnesota, Nebraska, North Dakota, Oklahoma, Texas, South Dakota, and Wisconsin). During 1979 and 1980, 13 detailed surveys were conducted by the URE Project in the Central and Western United States to characterize the hydrogeochemistry, stream sediment geochemistry, and/or radiometric patterns of known or potential uranium occurrences. Beginning in 1980, the HSSR surveys were modified to the Regional Hydrogeochemical and Stream Sediment (RHSS) surveys

  11. Aleutian Islands Coastal Resources Inventory and Environmental Sensitivity Maps: SOCECON (Socioeconomic Resource Points and Lines)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains human-use resource data for Coastal Resource Service Area (CRSA) boundaries, mineral sites, airports, boat ramps, marinas, and Coast Guard...

  12. Golden Gate National Recreation Area Vegetation Inventory Project

    California Natural Resource Agency — High resolution vegetation polygons mapped by the National Park Service. The vegetation units of this map were determined through stereoscopic interpretation of...

  13. Atmosphere Resource Recovery & Environmental Monitoring for Long Duration Exploration Project

    National Aeronautics and Space Administration — The AES Atmosphere Resource Recovery & Environmental Monitoring (ARREM) for Long Duration Exploration Project project is maturing Atmosphere Revitalization...

  14. New Approach for forest inventory estimation and timber harvesting planning in mountain areas: the SLOPE project

    Prandi, F.; Magliocchetti, D.; Poveda, A.; De Amicis, R.; Andreolli, M.; Devigili, F.

    2016-06-01

    Forests represent an important economic resource for mountainous areas being for a few region and mountain communities the main form of income. However, wood chain management in these contexts differs from the traditional schemes due to the limits imposed by terrain morphology, both for the operation planning aspects and the hardware requirements. In fact, forest organizational and technical problems require a wider strategic and detailed level of planning to reach the level of productivity of forest operation techniques applied on flatlands. In particular, a perfect knowledge of forest inventories improves long-term management sustainability and efficiency allowing a better understanding of forest ecosystems. However, this knowledge is usually based on historical parcel information with only few cases of remote sensing information from satellite imageries. This is not enough to fully exploit the benefit of the mountain areas forest stocks where the economic and ecological value of each single parcel depends on singletree characteristics. The work presented in this paper, based on the results of the SLOPE (Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas) project, investigates the capability to generate, manage and visualize detailed virtual forest models using geospatial information, combining data acquired from traditional on-the-field laser scanning surveys technologies with new aerial survey through UAV systems. These models are then combined with interactive 3D virtual globes for continuous assessment of resource characteristics, harvesting planning and real-time monitoring of the whole production.

  15. New Approach for forest inventory estimation and timber harvesting planning in mountain areas: the SLOPE project

    F. Prandi

    2016-06-01

    Full Text Available Forests represent an important economic resource for mountainous areas being for a few region and mountain communities the main form of income. However, wood chain management in these contexts differs from the traditional schemes due to the limits imposed by terrain morphology, both for the operation planning aspects and the hardware requirements. In fact, forest organizational and technical problems require a wider strategic and detailed level of planning to reach the level of productivity of forest operation techniques applied on flatlands. In particular, a perfect knowledge of forest inventories improves long-term management sustainability and efficiency allowing a better understanding of forest ecosystems. However, this knowledge is usually based on historical parcel information with only few cases of remote sensing information from satellite imageries. This is not enough to fully exploit the benefit of the mountain areas forest stocks where the economic and ecological value of each single parcel depends on singletree characteristics. The work presented in this paper, based on the results of the SLOPE (Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas project, investigates the capability to generate, manage and visualize detailed virtual forest models using geospatial information, combining data acquired from traditional on-the-field laser scanning surveys technologies with new aerial survey through UAV systems. These models are then combined with interactive 3D virtual globes for continuous assessment of resource characteristics, harvesting planning and real-time monitoring of the whole production.

  16. NREL: U.S. Life Cycle Inventory Database - About the LCI Database Project

    About the LCI Database Project The U.S. Life Cycle Inventory (LCI) Database is a publicly available database that allows users to objectively review and compare analysis results that are based on similar source of critically reviewed LCI data through its LCI Database Project. NREL's High-Performance

  17. Global Inventory and Analysis of Smart Grid Demonstration Projects

    Mulder, W.; Kumpavat, K.; Faasen, C.; Verheij, F.; Vaessen, P [DNV KEMA Energy and Sustainability, Arnhem (Netherlands)

    2012-10-15

    As the key enabler of a more sustainable, economical and reliable energy system, the development of smart grids has received a great deal of attention in recent times. In many countries around the world the benefits of such a system have begun to be investigated through a number of demonstration projects. With such a vast array of projects it can be difficult to keep track of changes, and to understand which best practices are currently available with regard to smart grids. This report aims to address these issues through providing a comprehensive outlook on the current status of smart grid projects worldwide.

  18. Hydroelectric resources. Inventory of the hydroelectric resources of the Atlantic Coast

    Arrieta, R.M.; Insignares R, G.

    1987-01-01

    Basically this report gives a clear vision of the possibilities of energy development in the Colombian Atlantic Coast, projects that contemplate a wide range as soon as it refers that is to say to generation ranges, they have been identified at level macro in the Sierra Nevada region and the Peasant with a profitable hydroelectric potential of 631 MW; in the Sinu region, 3 projects were identified with a profitable potential of 1186 MW and in the Magdalena region, was also identified 3 projects whose profitable potential is of 475 MW. At level micro, the carried out studies defined in the same previous regions a series of projects that they necessarily reach the megawatt. The report contains a description of each one of the identified projects and its current situation. It also presents a review of the makers of turbines that exist at the moment in the country

  19. Integrated data base report--1995: US spent nuclear fuel and radioactive waste inventories, projections, and characteristics

    1996-12-01

    The information in this report summarizes the U.S. Department of Energy (DOE) data base for inventories, projections, and characteristics of domestic spent nuclear fuel and radioactive waste. This report is updated annually to keep abreast of continual waste inventory and projection changes in both the government and commercial sectors. Baseline information is provided for DOE program planning purposes and to support DOE program decisions. Although the primary purpose of this document is to provide background information for program planning within the DOE community, it has also been found useful by state and local governments, the academic community, and some private citizens

  20. An inventory control project in a major Danish company using compound renewal demand models

    Larsen, Christian; Seiding, Claus Hoe; Teller, Christian

    operation is highly automated. However, the procedures for estimating demands and the policies for the inventory control system that were in use at the beginning of the project did not fully match the sophisticated technological standard of the physical system. During the initial phase of the project...... We describe the development of a framework to compute the optimal inventory policy for a large spare-parts' distribution centre operation in the RA division of the Danfoss Group in Denmark. The RA division distributes spare parts worldwide for cooling and A/C systems. The warehouse logistics...

  1. [Inventories of the Earth. Mineral resource appraisals and the rise of resource economics].

    Westermann, Andrea

    2014-03-01

    How do the earth sciences mediate between the natural and social world? This paper explores the question by focusing on the history of nonfuel mineral resource appraisal from the late nineteenth to the mid twentieth century. It argues that earth sciences early on embraced social scientific knowledge, i.e. economic knowledge, in particular, when it came to determining or deposits and estimating the magnitude of mineral reserves. After 1900, assessing national and global mineral reserves and their "life span" or years of supply became ever more important, scaling up and complementing traditional appraisal practices on the level of individual mines or mining and trading companies. As a consequence, economic methods gained new weight for mineral resource estimation. Natural resource economics as an own field of research grew out of these efforts. By way of example, the mineral resource appraisal assigned to the U.S. Materials Policy Commission by President Harry S. Truman in 1951 is analyzed in more detail. Natural resource economics and environmental economics might be interpreted as a strategy to bring down the vast and holistically conceived object of geological and ecological research, the earth, to human scale, and assimilate it into social matters.

  2. Inventory of cassava plant protection and development projects in ...

    A total of 303 cassava protection and development projects were identified of which about half are plant protection-oriented. Most activities on cassava protection have been centred on biological control and host plant resistance. The least activity has been on chemical control. The applicability of the collected database is ...

  3. THE CORONAL LOOP INVENTORY PROJECT: EXPANDED ANALYSIS AND RESULTS

    Schmelz, J. T. [USRA, 7178 Columbia Gateway Drive, Columbia, MD 21046 (United States); Christian, G. M.; Chastain, R. A., E-mail: jschmelz@usra.edu [Physics Department, University of Memphis, Memphis, TN 38152 (United States)

    2016-11-10

    We have expanded upon earlier work that investigates the relative importance of coronal loops with isothermal versus multithermal cross-field temperature distributions. These results are important for determining if loops have substructure in the form of unresolved magnetic strands. We have increased the number of loops targeted for temperature analysis from 19 to 207 with the addition of 188 new loops from multiple regions. We selected all loop segments visible in the 171 Å images of the Atmospheric Imaging Assembly (AIA) that had a clean background. Eighty-six of the new loops were rejected because they could not be reliably separated from the background in other AIA filters. Sixty-one loops required multithermal models to reproduce the observations. Twenty-eight loops were effectively isothermal, that is, the plasma emission to which AIA is sensitive could not be distinguished from isothermal emission, within uncertainties. Ten loops were isothermal. Also, part of our inventory was one small flaring loop, one very cool loop whose temperature distribution could not be constrained by the AIA data, and one loop with inconclusive results. Our survey can confirm an unexpected result from the pilot study: we found no isothermal loop segments where we could properly use the 171-to-193 ratio method, which would be similar to the analysis done for many loops observed with TRACE and EIT. We recommend caution to observers who assume the loop plasma is isothermal, and hope that these results will influence the direction of coronal heating models and the effort modelers spend on various heating scenarios.

  4. Spent fuel and radioactive waste inventories and projections as of December 31, 1980

    1981-09-01

    Current inventories and characteristics of commercial spent fuels and both commercial and US Department of Energy radioactive wastes were compiled, based on the most reliable information available from Government sources and the open literature, technical reports, and direct contacts. Future waste generation rates and characteristics of these materials to be accumulated over the remainder of this century are also presented, based on a present DOE/EIA projection of US commercial nuclear power growth and expected defense-related and industrial and institutional activities. Materials considered, on a chapter-by-chapter basis, are: spent fuel, high-level wastes, transuranic waste, low-level waste, remedial action waste, active uranium mill tailings, and airborne waste. For each category, current and projected inventories are given through the year 2000. The land usage requirements are given for storage/disposal of low-level and transuranic wastes, and for the present inventories of inactive uranium mill tailings

  5. Spent fuel and radioactive waste: an integrated data base of inventories, projections, and characteristics

    Notz, K.J.; Forsberg, C.W.; Mastal, E.F.

    1984-01-01

    The Integrated Data Base (IDB) Program provides official US Department of Energy (DOE) data on spent fuel and radioactive waste inventories, projections, and characteristics. This information is provided through the cooperative efforts of the IDB Program and DOE lead offices, lead sites, major programs, and generator sites. The program is entering its fifth year, and major accomplishments are summarized in three broad areas: (1) the annual inventory report, including ORIGEN2 applications and a Quality Assurance (QA) plan; (2) the summary data file and direct user access; and (3) data processing methodology and support to other programs. Plans for future work in these areas are outlined briefly, including increased utilization of personal computers. Some examples of spent fuel data are given in terms of projected quantities for two growth scenarios, burnup and age profile of the existing inventory, and the approximate specific thermal power relative to high-level waste (HLW) from various sources. 4 refs., 2 figs., 3 tabs

  6. Inventory of the patents and publications of FP7 projects in the field of ICT

    Jacob, J.; Sanditov, Bulat; Smirnov, Evgueni; Wintjes, Rene; Surpatean, A.; Notten, Ad; Sasso, Simone

    2015-01-01

    The inventory includes data on 295 patents and 18,158 publications resulting from FP7 funded projects in the field of ICT (ICT theme within Cooperation Programme and eInfrastructures within Capacities Programme). The period covered is 2007 - 2013. Patents and publications have been reported by

  7. Effects of resource management regimes on project schedule

    Al-Jibouri, Saad H.S.

    2002-01-01

    This paper deals with the problem of resource scheduling within given resource constraints on a sectionalised construction project. A computer model has been developed which realistically simulates the progress of projects. A project has been selected and divided into sections whereby section

  8. Inventory of demonstration and trail projects in sustainable energy and transport in Scandinavia

    Andersen, Per Dannemand; Cramer-Petersen, Claus Lundgaard; Harnes, Kristian N.

    This report documents the work of work package 2 of the InnoDemo research project funded by the Research Council of Norway. Partners in the project are The Nordic Institute for Studies in Innovation, Research and Education (NIFU) (project leader), DTU Management Engineering at Technical University...... of Denmark, and CIRCLE at Lund’s University. From a state-of-the-art study in the project’s work package 1, a set of characteristics have been specified to be collected in an inventory of demonstration projects and funding programmes. This data was collected in parallel in Denmark, Norway and Sweden...

  9. A project on groundwater research inventory and classification to make groundwater visible

    Cseko, Adrienn; Petitta, Marco; van der Keur, Peter; Fernandez, Isabel; Garcia Alibrandi, Clint; Hinsby, Klaus; Hartai, Eva; Garcia Padilla, Mercedes; Szucs, Peter; Mikita, Viktoria; Bisevac, Vanja; Bodo, Balazs

    2017-04-01

    Hydrogeology related research activities cover a wide spectrum of research areas at EU and national levels. The European knowledge base on this important topic is widespread and fragmented into broader programs generally related to waterresources, environment or ecology. In order to achieve a comprehensive understanding on the groundwater theme, the KINDRA project (Knowledge Inventory for Hydrogeology Research - www.kindraproject.eu) seeks to carry out an accurate assessment of the state of the art in hydrogeology research and to create a critical mass for scientific knowledge exchange of hydrogeology research, to ensure wide accessibility and applicability of research results, including support of innovation and development, and to reduce unnecessary duplication of efforts. The first two years of the project have focused its efforts in developing the concept of a Harmonized Terminology and Methodology for Classification and Reporting Hydrogeology related Research in Europe (HRCSYS) as well as its implementation in the European Inventory of Groundwater Research (EIGR). For developing the common terminology, keywords characterizing research on groundwater have been identified from two main sources: the most important EU directives and policy documents and from groundwater related scientific literature. To assess the importance and pertinence of the keywords, these have been ranked by performing searches via the Web of Science, Scopus and Google Scholar search engines. The complete merged list of keywords consisting of more than 200 terms has been organized in a tree hierarchy, identifying three main categories: Societal Challenges (SC), Operational Actions (OA) and Research Topics (RT). The relationships among these main categories expressed by a 3D approach, identifying single intersections among 5 main overarching groups for each category. The EIGR itself contains metadata (about 1800 records at the moment) of research efforts and topic related knowledge

  10. Time-constrained project scheduling with adjacent resources

    Hurink, Johann L.; Kok, A.L.; Paulus, J.J.; Schutten, Johannes M.J.

    We develop a decomposition method for the Time-Constrained Project Scheduling Problem (TCPSP) with adjacent resources. For adjacent resources the resource units are ordered and the units assigned to a job have to be adjacent. On top of that, adjacent resources are not required by single jobs, but by

  11. Time-constrained project scheduling with adjacent resources

    Hurink, Johann L.; Kok, A.L.; Paulus, J.J.; Schutten, Johannes M.J.

    2008-01-01

    We develop a decomposition method for the Time-Constrained Project Scheduling Problem (TCPSP) with Adjacent Resources. For adjacent resources the resource units are ordered and the units assigned to a job have to be adjacent. On top of that, adjacent resources are not required by single jobs, but by

  12. Inventory and case studies of Louisiana, non-electric industrial applications of geopressured geothermal resources. Quarterly progress report, March 1-May 31, 1977

    Schnadelbach, T.W. Jr.

    1977-06-01

    An inventory is provided of geopressured geothermal resources in Louisiana. The Louisiana industries; classified as Food and Kindred Products were cataloged and inventoried to determine potential and specific uses of the known energy resources. The possibility of relocating industries to the available resources is explored. Individual case studies are presented for near term industrial conversion for resource application. (MHR)

  13. Project SAFE. Update of the SFR-1 safety assessment. Phase 1. Appendix A1: Inventory

    Riggare, P.

    1998-01-01

    One of the aims in the safety assessment of SFR-1 is to estimate the release to the environment. In order to make these calculations there is a need to describe the inventory in greater detail. The new computerised database of waste in SFR-1 gives a good possibility to achieve this. The aim for project SAFE is to make both conservative and realistic radionuclide transport calculations. To achieve this goal there must be two inventories. The conservative inventory is the inventory used in the design of the repository, which in most parts is identical with the limits in the licence for SFR-1. There is a great interest to have good estimates of the volumes of the different waste types. A thorough prognosis should be made in 1999, but until then the latest one from 1995 could be used in the calculations. The total (actual) inventory of nuclides is calculated from the measurements of the easy-to-measure nuclides since, in principle, all hard-to-measure nuclides are calculated by correlation factors to 60 Co and 137 Cs . These factors should be reviewed since there are quite large uncertainties involved. 14 C dominates the individual doses after a few hundred years and the collective dose in the inland-scenario. The amount of the nuclide is uncertain since the correlation factor is very uncertain. The chemical speciation of 14 C is also of interest due to different properties of organic and inorganic carbon. 36 Cl is very hard to measure. Although the authorities in their reviews of the safety reports say that there probably are small doses from chlorine, the inventory should be improved. 59 Ni is a long-lived nuclide that sets a limit to the close-to-the-core metal scrap that can be taken to SFR- 1. There is an ongoing research project to provide a better measuring method for 59 Ni. This should make it possible to improve the knowledge about 59 Ni inventory. The assumption that 90 % of the inventory is collected in the ion-exchange resins should be checked. Actinides

  14. Project Management Methodology in Human Resource Management

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  15. Effects of control technology on the projected krypton-85 environmental inventory

    Oscarson, E.E.

    1973-01-01

    Growth projections for the USA nuclear power industry may be used to make projections of future radioactive material inventories available for potential release to the environment. Since krypton-85 is produced in reactors, the potential routes of release to the environment are at the reactors or the fuel reprocessing plants. The present generation of reactors and fuel reprocessing plants do not use any systems to limit the release of krypton-85 into the biosphere. Clean-up systems are currently being designed and could be introduced when necessary. The cumulative inventory of krypton-85 in the environment is dependent upon the time of introduction of these clean-up systems and their efficiencies, in addition to the total quantity produced. Annual and cumulative inventories of krypton-85 are projected to increase dramatically over the next 50 years. If controls are assumed to be initiated at various years, a series of graphs of different cumulative environmental inventories and the associated doses and health effects are drawn. Varying the year of introduction and the efficiency of these systems allows one to speculate as to the optimum time for control implementation

  16. Management Strategy for Hydroelectric Project Toro 2: Knowing and enhancing natural resources sustainably

    José Pereira Chaves

    2014-01-01

    Full Text Available The aim of this article is to understand and sustainably enhance the biological and ecological resources of the Hydroelectric Project of Toro 2, thus; a research was carried out to inventory the presence of birds, mammals and plants, in order to know if the site qualifies as a biological tourist attraction, as well as to know the opinion of local people. It is proposed the sustainable uses of natural resources, through a strategy of use, management and conservation of the ecosystems.

  17. The AVI project: A bibliographical and archive inventory of landslides and floods in Italy

    Guzzetti, Fausto; Cardinali, Mauro; Reichenbach, Paola

    1994-07-01

    The AVI project was commissioned by the Minister of Civil Protection to the National Group for Prevention of Hydrogeologic Hazards to complete an inventory of areas historically affected by landslides and floods in Italy. More than 300 people, divided into 15 research teams and two support groups, worked for one year on the project. Twenty-two journals were systematically searched for the period 1918 1990, 350,000 newspaper issues were screened, and 39,953 articles were collected. About 150 experts on mass movement and floods were interviewed and 1482 published and unpublished technical and scientific reports were reviewed. The results of the AVI project, in spite of the limitations, represent the most comprehensive archiving of mass movement and floods ever prepared in Italy. The type and quality of the information collected and the methodologies and techniques used to make the inventory are discussed. Possible applications and future developments are also presented.

  18. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  19. Resource allocation in IT projects: using schedule optimization

    Michael Chilton

    2014-01-01

    Full Text Available Resource allocation is the process of assigning resources to tasks throughout the life of a project. Despite sophisticated software packages devoted to keeping track of tasks, resources and resource assignments, it is often the case that project managers find some resources over-allocated and therefore unable to complete the assigned work in the allotted amount of time. Most scheduling software has provisions for leveling resources, but the techniques for doing so simply add time to the schedule and may cause delays in tasks that are critical to the project in meeting deadlines. This paper presents a software application that ensures that resources are properly balanced at the beginning of the project and eliminates the situation in which resources become over-allocated. It can be used in a multi-project environment and reused throughout the project as tasks, resource assignments and availability, and the project scope change. The application utilizes the bounded enumeration technique to formulate an optimal schedule for which both the task sequence and resource availability are taken into account. It is run on a database server to reduce the running time and make it a viable application for practitioners.

  20. Integrated data base report - 1994: US spent nuclear fuel and radioactive waste inventories, projections, and characteristics

    1995-09-01

    The Integrated Data Base Program has compiled historic data on inventories and characteristics of both commercial and U.S. Department of Energy (DOE) spent nuclear fuel and commercial and U.S. government-owned radioactive wastes. Except for transuranic wastes, inventories of these materials are reported as of December 31, 1994. Transuranic waste inventories are reported as of December 31, 1993. All spent nuclear fuel and radioactive waste data reported are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest DOE/Energy Information Administration (EIA) projections of U.S. commercial nuclear power growth and the expected DOE-related and private industrial and institutional activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, DOE Environmental Restoration Program contaminated environmental media, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the calendar-year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions

  1. Integrated data base report - 1994: US spent nuclear fuel and radioactive waste inventories, projections, and characteristics

    NONE

    1995-09-01

    The Integrated Data Base Program has compiled historic data on inventories and characteristics of both commercial and U.S. Department of Energy (DOE) spent nuclear fuel and commercial and U.S. government-owned radioactive wastes. Except for transuranic wastes, inventories of these materials are reported as of December 31, 1994. Transuranic waste inventories are reported as of December 31, 1993. All spent nuclear fuel and radioactive waste data reported are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest DOE/Energy Information Administration (EIA) projections of U.S. commercial nuclear power growth and the expected DOE-related and private industrial and institutional activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, DOE Environmental Restoration Program contaminated environmental media, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the calendar-year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions.

  2. Integrated data base report - 1996: US spent nuclear fuel and radioactive waste inventories, projections, and characteristics

    1997-12-01

    The Integrated Data Base Program has compiled historic data on inventories and characteristics of both commercial and U.S. Department of Energy (DOE) spent nuclear fuel (SNF) and commercial and U.S. government-owned radioactive wastes. Inventories of most of these materials are reported as of the end of fiscal year (FY) 1996, which is September 30, 1996. Commercial SNF and commercial uranium mill tailings inventories are reported on an end-of-calendar year (CY) basis. All SNF and radioactive waste data reported are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest DOE/Energy Information Administration (EIA) projections of U.S. commercial nuclear power growth and the expected DOE-related and private industrial and institutional activities. The radioactive materials considered, on a chapter-by-chapter basis, are SNF, high-level waste, transuranic waste, low-level waste, uranium mill tailings, DOE Environmental Restoration Program contaminated environmental media, naturally occurring and accelerator-produced radioactive material, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through FY 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions

  3. The Environmental Restoration Project Style and Resources Guide; TOPICAL

    C. J. Forbes

    1999-01-01

    This Style Guide identifies the wide and flexible array of support services/resources that are available to ER project and functional organizations through Publication and Graphic Services. The Style Guide describes how ER Project groups can complete virtually any kind of information project without any costs charged to their budgets. Another purpose of the Style Guide is to provide ER project and functional organizations with the ability to determine when to request capabilities/resources for information projects, and when to complete such projects on their own

  4. Inventory of current environmental monitoring projects in the US-Canadian transboundary region

    Glantz, C.S.; Ballinger, M.Y.; Chapman, E.G.

    1986-05-01

    This document presents the results of a study commissioned to survey and summarize major environmental monitoring projects in the US-Canadian transboundary region. Projects with field sites located within 400 km (250 mi) of the border and active after 1980 were reviewed. The types of projects included: ambient air-quality monitoring, ambient water-quality monitoring, deposition monitoring, forest/vegetation monitoring and research, soil studies, and ecosystem studies. Ecosystem studies included projects involving the measurement of parameters from more than one monitoring category (e.g., studies that measured both water and soil chemistry). Individual descriptions were formulated for 184 projects meeting the spatial and temporal criteria. Descriptions included the official title for the project, its common abbreviation, program emphasis, monitoring site locations, time period conducted, parameters measured, protocols employed, frequency of sample collection, data storage information, and the principal contact for the project. A summary inventory subdivided according to the six monitoring categories was prepared using a computerized data management system. Information on major centralized data bases in the field of environmental monitoring was also obtained, and summary descriptions were prepared. The inventory and data base descriptions are presented in appendices to this document.

  5. Integrated multi-resource planning and scheduling in engineering project

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  6. Radioactive waste management: a series of bibliographies. Radioactive waste inventories and projections. Supplement 1

    McLaren, L.H.

    1986-01-01

    This bibliography contains information on radioactive waste inventories and projections included in the Department of Energy's Energy Data Base from October 1982 through December 1984. The arrangement is by report number for reports, followed by nonreports in reverse chronological order. These citations are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes, each preceded by a brief description, are provided: Corporate Author, Personal Author, Subject, Contract Number, and Report Number. 31 abstracts

  7. Integrated data base for 1988: Spent fuel and radioactive waste inventories, projections, and characteristics

    1988-09-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1987. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The current projections of future waste and spent fuel to be generated through the year 2020 and characteristics of these materials are also presented. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected defense-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis are: spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, remedial action waste, and decommissioning waste. For each category, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reportd for miscellaneous, highly radioactive materials that may require geologic disposal. 89 refs., 46 figs., 104 tabs

  8. Integrated Data Base for 1989: Spent fuel and radioactive waste inventories, projections, and characteristics

    1989-11-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1988. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The current projections of future waste and spent fuel to be generated through the year 2020 and characteristics of these materials are also presented. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected defense-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, remedial action waste, commercial reactor and fuel cycle facility decommissioning waste, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous, highly radioactive materials that may require geologic disposal. 45 figs., 119 tabs

  9. Integrated data base for 1990: US spent fuel and radioactive waste inventories, projections, and characteristics

    1990-10-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1989. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The current projections of future waste and spent fuel to be generated through the year 2020 and characteristics of these materials are also presented. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal. 22 refs., 48 figs., 109 tabs

  10. Integrated Data Base for 1991: US spent fuel and radioactive waste inventories, projections, and characteristics

    1991-10-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1990. These data are based on the most reliable information available form government sources, the open literature, technical reports, and direct contacts. The current projections of future waste and spent fuel to be generated generally through the year 2020 and characteristics of these materials are also presented. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered are spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal. 160 refs., 61 figs., 142 tabs

  11. Aurora Mine project - historical resources baseline study

    Reeves, B.

    1996-01-01

    This volume contains the results of a base line archaeological study of the Aurora Mine Project local study area. It was compiled in support of Syncrude Canada's application to the Alberta Energy and Utilities Board (AEUB) and Alberta Environmental Protection to construct and operate it new Aurora Mine, located northeast of Fort McMurray, Alberta. The objective of this study was to compile, consolidate, review and analyze the reports for the area compiled over the past 22 years in and adjacent to the local study area (LSA), particularly those of now existing and Syncrude projects, and previously proposed Alsands and OSLO projects. The report is a summary of the human history in the area including pre-contact native archaeological sites, past archaeological studies, the Hinterland site pattern, post-contact native traditional sites, oil sands exploration/development related sites and paleontological sites in the subject area, and areas adjacent to it. 150 refs., 5 tabs., 43 figs

  12. Integrated data base for 1993: US spent fuel and radioactive waste inventories, projections, and characteristics

    Klein, J.A.; Storch, S.N.; Ashline, R.C.

    1994-03-01

    The Integrated Data Base (IDB) Program has compiled historic data on inventories and characteristics of both commercial and DOE spent fuel; also, commercial and U.S. government-owned radioactive wastes through December 31, 1992. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest U.S. Department of Energy/Energy Information Administration (DOE/EIA) projections of U.S. commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste (HLW), transuranic (TRU), waste, low-level waste (LLW), commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) LLW. For most of these categories, current and projected inventories are given through the calendar-year (CY) 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal

  13. Integrated Data Base for 1992: US spent fuel and radioactive waste inventories, projections, and characteristics

    1992-10-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1991. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal

  14. The Southern Alberta Information Resources (SAIR Project

    Kathy Crewdson

    2008-06-01

    Full Text Available Abstract Southern Alberta Information Resources (SAIR is a collaborative bibliography of published resources significant to southern Alberta. Objectives and progress with evolving methodology, technology, issues and challenges are explored within the context of the library field. We investigate a collaborative digital library that allows librarians and non-librarians alike to share information on specific topics through MARC records. An outcome of a collaborative digital library is how to create and sustain interest within the library community. Southern Alberta region was selected based on the authors’ familiarity with the region. Some issues and questions remain to be resolved. Digital formats present a number of challenges in terms of selection and presentation. Legal issues relating to technology such as linking and location information have emerged. Basic technical issues remain, such as, how best to update links.

  15. Spatial Statistical and Modeling Strategy for Inventorying and Monitoring Ecosystem Resources at Multiple Scales and Resolution Levels

    Robin M. Reich; C. Aguirre-Bravo; M.S. Williams

    2006-01-01

    A statistical strategy for spatial estimation and modeling of natural and environmental resource variables and indicators is presented. This strategy is part of an inventory and monitoring pilot study that is being carried out in the Mexican states of Jalisco and Colima. Fine spatial resolution estimates of key variables and indicators are outputs that will allow the...

  16. The mobilization of supplier resources for complex projects

    Lutz, Salla; Ellegaard, Chris

    2015-01-01

    . Therefore, buying companies also need to influence supplier actors to prioritize and optimize resource flows into their specific exchange. Based on a theoretical basis comprising the literature on buyer-seller relationship, including resource based research of the Industrial Marketing and Purchasing (IMP......) group, as well as Dynamic Capabilities theory and the project management literature, this paper presents the results from a study of applied buying company resource mobilization routines. We report on a qualitative investigation of routines applied in complex construction projects in the North European...... offshore wind turbine industry. Complex construction/production projects are widespread global business phenomena, but knowledge of resource mobilization routines in this context is scarce in the literature. We find that the complex project owner (buying company) applies a series of 11 particular routines...

  17. Integrated data base for 1986: spent fuel and radioactive waste inventories, projections, and characteristics. Revision 2

    1986-09-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US Department of Energy (DOE) radioactive wastes through December 31, 1985, based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. Current projections of future waste and spent fuel to be generated through the year 2020 and characteristics of these materials are also presented. The information forecasted is consistent with the expected defense-related and private industrial and institutional activities and the latest DOE/Energy Information Administration (EIA) projections of US commercial nuclear power growth. The materials considered, on a chapter-by-chapter basis, are: spent fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, remedial action waste, and decommissioning waste. For each category, current and projected inventories are given through the year 2020, and the radioactivity and thermal power are calculated based on reported or calculated isotopic compositions

  18. How do glacier inventory data aid global glacier assessments and projections?

    Hock, R.

    2017-12-01

    Large-scale glacier modeling relies heavily on datasets that are collected by many individuals across the globe, but managed and maintained in a coordinated fashion by international data centers. The Global Terrestrial Network for Glaciers (GTN-G) provides the framework for coordinating and making available a suite of data sets such as the Randolph Glacier Inventory (RGI), the Glacier Thickness Dataset or the World Glacier Inventory (WGI). These datasets have greatly increased our ability to assess global-scale glacier mass changes. These data have also been vital for projecting the glacier mass changes of all mountain glaciers in the world outside the Greenland and Antarctic ice sheet, a total >200,000 glaciers covering an area of more than 700,000 km2. Using forcing from 8 to 15 GCMs and 4 different emission scenarios, global-scale glacier evolution models project multi-model mean net mass losses of all glaciers between 7 cm and 24 cm sea-level equivalent by the end of the 21st century. Projected mass losses vary greatly depending on the choice of the forcing climate and emission scenario. Insufficiently constrained model parameters likely are an important reason for large differences found among these studies even when forced by the same emission scenario, especially on regional scales.

  19. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable

  20. One project`s waste is another project`s resource

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  1. Forest inventory with LiDAR and stereo DSM on Washington department of natural resources lands

    Jacob L. Strunk; Peter J. Gould

    2015-01-01

    DNR’s forest inventory group has completed its first version of a new remote-sensing based forest inventory system covering 1.4 million acres of DNR forest lands. We use a combination of field plots, lidar, NAIP, and a NAIP-derived canopy surface DSM. Given that height drives many key inventory variables (e.g. height, volume, biomass, carbon), remote-sensing derived...

  2. Management and Development of the Western Resources Project

    Terry Brown

    2009-03-09

    The purpose of this project was to manage the Western Resources Project, which included a comprehensive, basin-wide set of experiments investigating the impacts of coal bed methane (CBM; a.k.a. coal bed natural gas, CBNG) production on surface and groundwater in the Powder River Basin in Wyoming. This project included a number of participants including Apache Corporation, Conoco Phillips, Marathon, the Ucross Foundation, Stanford University, the University of Wyoming, Montana Bureau of Mines and Geology, and Western Research Institute.

  3. Natural Resource Damages Settlement Projects at the Fernald Preserve - 12316

    Powell, Jane [Fernald Preserve Site Manager, DOE Office of Legacy Management, Harrison, Ohio (United States); Schneider, Tom [Fernald Project Manager, Ohio Environmental Protection Agency, Dayton, Ohio (United States); Hertel, Bill [Project Manager, S.M. Stoller Corporation, Harrison, Ohio (United States); Homer, John [Environmental Scientist, S.M. Stoller Corporation, Harrison, Ohio (United States)

    2012-07-01

    This paper describes the development and implementation of two ecological restoration projects at the Fernald Preserve that are funded through a CERCLA natural resource damage settlement. The Paddys Run Tributary Project involves creation of vernal pool wetland habitat with adjacent forest restoration. The Triangle Area Project is a mesic tall-grass prairie establishment, similar to other efforts at the Fernald Preserve. The goal of the Fernald Natural Resource Trustees is to establish habitat for Ambystomatid salamander species, as well as grassland birds. Planning and implementation of on-property ecological restoration projects is one component of compensation for natural resource injury. As with the rest of the Fernald Preserve, ecological restoration has helped turn a DOE liability into a community asset. (authors)

  4. The software analysis project for the Office of Human Resources

    Tureman, Robert L., Jr.

    1994-01-01

    There were two major sections of the project for the Office of Human Resources (OHR). The first section was to conduct a planning study to analyze software use with the goal of recommending software purchases and determining whether the need exists for a file server. The second section was analysis and distribution planning for retirement planning computer program entitled VISION provided by NASA Headquarters. The software planning study was developed to help OHR analyze the current administrative desktop computing environment and make decisions regarding software acquisition and implementation. There were three major areas addressed by the study: current environment new software requirements, and strategies regarding the implementation of a server in the Office. To gather data on current environment, employees were surveyed and an inventory of computers were produced. The surveys were compiled and analyzed by the ASEE fellow with interpretation help by OHR staff. New software requirements represented a compilation and analysis of the surveyed requests of OHR personnel. Finally, the information on the use of a server represents research done by the ASEE fellow and analysis of survey data to determine software requirements for a server. This included selection of a methodology to estimate the number of copies of each software program required given current use and estimated growth. The report presents the results of the computing survey, a description of the current computing environment, recommenations for changes in the computing environment, current software needs, management advantages of using a server, and management considerations in the implementation of a server. In addition, detailed specifications were presented for the hardware and software recommendations to offer a complete picture to OHR management. The retirement planning computer program available to NASA employees will aid in long-range retirement planning. The intended audience is the NASA civil

  5. The Mentoring Profile Inventory: An Online Professional Development Resource for Cooperating Teachers

    Clarke, Anthony; Collins, John; Triggs, Valerie; Nielsen, Wendy; Augustine, Ann; Coulter, Dianne; Cunningham, Joni; Grigoriadis, Tina; Hardman, Stephanie; Hunter, Lee; Kinegal, Jane; Li, Bianca; Mah, Jeff; Mastin, Karen; Partridge, David; Pawer, Leonard; Rasoda,Sandy; Salbuvik, Kathleen; Ward, Mitch; White, Janet; Weil, Frederick

    2012-01-01

    We report on the origins, development and refinement of an online inventory to help cooperating teachers focus on selected dimensions of their practice. The Mentoring Profile Inventory (MPI) helps quantify important features of both the motivating and challenging aspects of mentoring student teachers and provides results to respondents in a…

  6. Nevada Photo-Based Inventory Pilot (NPIP) resource estimates (2004-2005)

    Tracey S. Frescino; Gretchen G. Moisen; Paul L. Patterson; Elizabeth A. Freeman; James Menlove

    2016-01-01

    The complex nature of broad-scale, strategic-level inventories, such as the Forest Inventory and Analysis program (FIA) of the USDA Forest Service, demands constant evolution and evaluation of methods to get the best information possible while continuously increasing efficiency. The State of Nevada is predominantly comprised of nonforested Federal lands with a small...

  7. Inventory and characteristics of current and projected low-level radioactive materials and waste in the United States

    Bisaria, A.; Bugos, R.G.; Pope, R.B.; Salmon, R.; Storch, S.N.; Lester, P.B.

    1994-01-01

    The Integrated Data Base (IDB), under US Department of Energy (DOE) funding and guidance, provides an annual update of compiled data on current and projected inventories and characteristics of DOE and commercially owned radioactive wastes. The data base addresses also the inventories of DOE and commercial spent fuel. These data are derived from reliable information from government sources, open literature, technical reports, and direct contacts. The radioactive materials considered are spent nuclear fuel, high-level waste (HLW), transuranic (TRU) waste, low-level waste (LLW), commercial uranium mill tailings, environmental restoration wastes, and mixed-LLW. This paper primarily focuses on LLW inventory and characterization

  8. Resource Constrained Planning of Multiple Projects with Separable Activities

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  9. Water Resources Research Grant Program project descriptions, fiscal year 1987

    ,

    1987-01-01

    This report contains information on the 34 new projects funded by the United States Geological Survey 's Water Resources Research Grant Program in fiscal year 1987 and on 3 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), and a project description that includes: (1) identification of water related problems and problem-solution approach (2) contribution to problem solution, (3) objectives, and (4) approach. The 34 projects include 12 in the area of groundwater quality problems, 12 in the science and technology of water quality management, 1 in climate variability and the hydrologic cycle, 4 in institutional change in water resources management, and 5 in surface water management. For the three completed projects, the report furnishes the grant number; project title; performing organization; principal investor(s); starting data; data of receipt of final report; and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report contains tables showing: (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization. (Author 's abstract)

  10. Natural Resources Management on Corps of Engineers Water Resources Development Projects: Practices, Challenges, and Perspectives on the Future

    Kasual, Richard

    1998-01-01

    Natural resources management on U.S. Army Corps of Engineers water resources development projects was documented from the responses of management personnel to a detailed questionnaire mailed to a stratified random sample of projects...

  11. Forest resource projection tools at the European level

    Schelhaas, M.; Nabuurs, G.J.; Verkerk, P.J.; Hengeveld, G.M.; Packalen, Tuula; Sallnäs, O.; Pilli, Roberto; Grassi, J.; Forsell, Nicklas; Frank, S.; Gusti, Mykola; Havlik, Petr

    2017-01-01

    Many countries have developed their own systems for projecting forest resources and wood availability. Although studies using these tools are helpful for developing national policies, they do not provide a consistent assessment for larger regions such as the European Union or Europe as a whole.

  12. Automated Inventory and Monitoring of the ALICE HLT Cluster Resources with the SysMES Framework

    Ulrich, J; Lara, C; Böttger, S; Kebschull, U; Haaland, Ø; Röhrich, D

    2012-01-01

    The High-Level-Trigger (HLT) cluster of the ALICE experiment is a computer cluster with about 200 nodes and 20 infrastructure machines. In its current state, the cluster consists of nearly 10 different configurations of nodes in terms of installed hardware, software and network structure. In such a heterogeneous environment with a distributed application, information about the actual configuration of the nodes is needed to automatically distribute and adjust the application accordingly. An inventory database provides a unified interface to such information. To be useful, the data in the inventory has to be up to date, complete and consistent. Manual maintenance of such databases is error-prone and data tends to become outdated. The inventory module of the ALICE HLT cluster overcomes these drawbacks by automatically updating the actual state periodically and, in contrast to existing solutions, it allows the definition of a target state for each node. A target state can simply be a fully operational state, i.e. a state without malfunctions, or a dedicated configuration of the node. The target state is then compared to the actual state to detect deviations and malfunctions which could induce severe problems when running the application. The inventory module of the ALICE HLT cluster has been integrated into the monitoring and management framework SysMES in order to use existing functionality like transactionality and monitoring infrastructure. Additionally, SysMES allows to solve detected problems automatically via its rule-system. To describe the heterogeneous environment with all its specifics, like custom hardware, the inventory module uses an object-oriented model which is based on the Common Information Model. The inventory module provides an automatically updated actual state of the cluster, detects discrepancies between the actual and the target state and is able to solve detected problems automatically. This contribution presents the current implementation

  13. Penerapan Enterprise Resource Planning (ERP pada Sistem Pembelian, Penjualan dan Inventory Barang di Mini Market 7 Putra

    Andre Nofriandi

    2015-10-01

    Full Text Available 7 Putra is one of the mini market located on the Pasar Sungai Sariak. Purchasing, sales, and inventory of goods on this market mini is done without using a computer. It can be seen from the process of buying new goods, the receipt of goods, payment to suppliers, inventories in storage, movement of goods, sales of goods and payments from customers. ll of the above processes suffer from the financial constraints and poorly controlled. Application development Enterprise Resource Planning (ERP in a mini-market 7 Putra to assist and facilitate the process of purchase, sales and inventory items. Implementation of ERP in 7 Putra done through several stages of the business process analysis, analysis of ERP selection, ERP implementation and ERP testing. In filming the analysis of business processes, use BPMN (Business Process Modeling Notation. The module used in this research is the main module purchase, sales, as well as items and inventory. Before the implementation of ERP. ERP selection was done according to the 7th Round. The results of the election analysis showed FrontAccounting application is an application that is suitable for 7 Putra. ERP implementation is done by using the application FrontAccounting. System testing is done to check and make sure it is appropriate and ERP applications can run as expected. The test is based on existing business processes in 7 Putra. Results of testing ERP accordance with existing reporting and business processes in the 7th Round

  14. A case study of resources management planning with multiple objectives and projects

    Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.

    1994-09-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.

  15. Projected wood energy impact on US forest wood resources

    Skog, K.E. [USDA Forest Service, Madison, WI (United States)

    1993-12-31

    The USDA Forest Service has developed long-term projections of wood energy use as part of a 1993 assessment of demand for and supply of resources from forest and range lands in the United States. To assess the impact of wood energy demand on timber resources, a market equilibrium model based on linear programming was developed to project residential, industrial, commercial, and utility wood energy use from various wood energy sources: roundwood from various land sources, primary wood products mill residue, other wood residue, and black liquor. Baseline projections are driven by projected price of fossil fuels compared to price of wood fuels and the projected increase in total energy use in various end uses. Wood energy use is projected to increase from 2.67 quad in 1986 to 3.5 quad in 2030 and 3.7 quad in 2040. This is less than the DOE National Energy Strategy projection of 5.5 quad in 2030. Wood energy from forest sources (roundwood) is projected to increase from 3.1 billion (10{sup 9}) ft{sup 3} in 1986 to 4.4. billion ft{sup 3} in 2030 and 4.8 billion ft{sup 3} in 2040 (88, 124 and 136 million m{sup 3}, respectively). This rate of increase of roundwood use for fuel -- 0.8 percent per year -- is virtually the same as the projected increase rate for roundwood for pulpwood. Pulpwood roundwood is projected to increase from 4.2 billion ft{sup 3} in 1986 to 6.0 billion ft{sup 3} in 2030 and 6.4 billion ft{sup 3} in 2040 (119, 170 and 183 million m{sup 3}, respectively).

  16. Carbon emissions and resources use by Chinese economy 2007: A 135-sector inventory and input-output embodiment

    Chen, G. Q.; Chen, Z. M.

    2010-11-01

    A 135-sector inventory and embodiment analysis for carbon emissions and resources use by Chinese economy 2007 is presented in this paper by an ecological input-output modeling based on the physical entry scheme. Included emissions and resources belong to six categories as: (1) greenhouse gas (GHG) in terms of CO 2, CH 4, and N 2O; (2) energy in terms of coal, crude oil, natural gas, hydropower, nuclear power, and firewood; (3) water in terms of freshwater; (4) exergy in terms of coal, crude oil, natural gas, grain, bean, tuber, cotton, peanut, rapeseed, sesame, jute, sugarcane, sugar beet, tobacco, silkworm feed, tea, fruits, vegetables, wood, bamboo, pulp, meat, egg, milk, wool, aquatic products, iron ore, copper ore, bauxite, lead ore, zinc ore, pyrite, phosphorite, gypsum, cement, nuclear fuel, and hydropower; (5) and (6) solar and cosmic emergies in terms of sunlight, wind power, deep earth heat, chemical power of rain, geopotential power of rain, chemical power of stream, geopotential power of stream, wave power, geothermal power, tide power, topsoil loss, coal, crude oil, natural gas, ferrous metal ore, non-ferrous metal ore, non-metal ore, cement, and nuclear fuel. Accounted based on the embodied intensities are carbon emissions and resources use embodied in the final use as rural consumption, urban consumption, government consumption, gross fixed capital formation, change in inventories, and export, as well as in the international trade balance. The resulted database is basic to environmental account of carbon emissions and resources use at various levels.

  17. Endangered Species and Wildlife Resources Inventory Kwajalein Atoll, U.S. Army , Republic of the Marshall Islands 1996 (NODC Accession 0000251)

    National Oceanic and Atmospheric Administration, Department of Commerce — This report summarizes the results of the first Environmental Standards and Procedures (UES) inventory of endangered species and wildlife resources at United States...

  18. Inventory of endangered species and wildlife resources at the US Army Kwajalein Atoll, Republic of the Marshall Islands, 1988 (NODC Accession 0000631)

    National Oceanic and Atmospheric Administration, Department of Commerce — An inventory of endangered species and the wildlife resources at the US Army Kwajelein Atoll, Republic of the Marshall Island were conducted from 30 October 1998 to...

  19. 77 FR 33774 - Agency Information Collection Activities: Comment Request; Education and Human Resources Project...

    2012-06-07

    ... and Human Resources Project Monitoring Clearance AGENCY: National Science Foundation. ACTION: Notice...). SUPPLEMENTARY INFORMATION: Title of Collection: Education and Human Resources Project Monitoring Clearance. OMB... States and internationally. The Directorate for Education and Human Resources (EHR), a unit within NSF...

  20. 76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation

    2011-10-17

    ... Resource Pool; Loveland Area Projects, General Eligibility Criteria. The resource pool for capacity and... transmission in Kansas. Final allocation of the Post-2014 Resource Pool; Loveland Area Projects, is contingent...

  1. Nuclear human resource projection up to 2030 in KOREA

    Min, Byung Joo; Lee, Man Ki; Nam, Kee Yung; Jeong, Ki Ho

    2011-01-01

    The prospects for growth of the nuclear power industry in Korea have improved remarkably as the demand for energy increases in stride with economic development. Meanwhile, as nuclear energy development is enhanced, nuclear technology has also improved evolutionarily and innovatively in the areas of reactor design and safety measures. As nuclear technology development in Korea advances, more human resources are required. Accordingly, the need for a well-managed program of human resource development (HRD) aimed at assuring needed capacities, skills, and knowledge and maintaining valuable human resources through education and training in various nuclear-related fields has been recognized. A well-defined and object-oriented human resource development and management (HRD and M) is to be developed in order to balance between the dynamics of supply and demand of the workforce in the nuclear industry. The HRD and M schemes include a broad base of disciplines, education, sciences, and technologies within a framework of national sustainable development goals, which are generally considered to include economics, environment, and social concerns. In this study, the projection methodology considering a variety of economic, social, and environmental factors was developed. Using the developed methodology, medium- and long-term nuclear human resources projections up to 2030 were conducted in compliance with the national nuclear technology development programmes and plans

  2. Resource Allocation in a Repetitive Project Scheduling Using Genetic Algorithm

    Samuel, Biju; Mathew, Jeeno

    2018-03-01

    Resource Allocation is procedure of doling out or allocating the accessible assets in a monetary way and productive way. Resource allocation is the scheduling of the accessible assets and accessible exercises or activities required while thinking about both the asset accessibility and the total project completion time. Asset provisioning and allocation takes care of that issue by permitting the specialist co-ops to deal with the assets for every individual demand of asset. A probabilistic selection procedure has been developed in order to ensure various selections of chromosomes

  3. Timber resource statistics for the Copper River inventory unit, Alaska, 1968.

    Karl M. Hegg

    1975-01-01

    This first intensive forest inventory of Alaska's Copper River Valley found a commercial forest area of 287,800 acres with 303.8 million cubic feet of growing stock. Additionally, a noncommercial stratum was examined that had substantial standing volume but did not meet the growth criteria for commercial forest land. This stratum contained 152,800 acres with a...

  4. Test Reviews: Loranger, A. W. (2001). "OMNI Personality Inventory." Lutz, FL: Psychological Assessment Resources

    Guess, Pamela

    2006-01-01

    The OMNI Personality Inventory (OMNI) is a self-report questionnaire designed for use with adolescents and adults between 18 and 74 years of age. The questionnaire is not based on a particular theory, consistent with current trends in test development, according to the author. An abbreviated form of the OMNI, the OMNI-IV Personality Disorder…

  5. Data analysis and management for the Uranium Resource Evaluation Project

    Kane, V.E.

    1980-01-01

    The Department of Energy has funded a large data collection effort with the purpose of determining the US uranium resources. This Uranium Resource Evaluation (URE) Project required a large data management effort which involved collection, retrieval, processing, display, and analysis of large volumes of data. Many of the characteristics of this data processing system are relevant to other applications, particularly where routine processing involves analyses for input into numerous technical reports. The URE Project computing system has a modular program structure which has enabled a straightforward interface with both special and general graphics and analysis packages such as SAS, BMDP, and SURFACE II. Other topics include cost-effective computing, data quality, report quality computer output, and test versus production program development

  6. Responsible Mining: A Human Resources Strategy for Mine Development Project

    Sampathkumar, Sriram (Ram)

    2012-01-01

    Mining is a global industry. Most mining companies operate internationally, often in remote, challenging environments and consequently frequently have respond to unusual and demanding Human Resource (HR) requirements. It is my opinion that the strategic imperative behind success in mining industry is responsible mining. The purpose of this paper is to examine how an effective HR strategy can be a competitive advantage that contributes to the success of a mining project in the global mining in...

  7. Mackenzie Gas Project : gas resource and supply study

    Harris, D.G.; Braaten, K.M.

    2004-01-01

    A study was conducted to assess the future gas supply for the Mackenzie Gas Project. The economically recoverable gas resources and deliverability in the region were assessed in order to support construction of the Mackenzie Valley pipeline and the associated gathering system. This supply study was based on a 25 year timeframe for resource development. Production forecasts were also prepared for 50 years following the date of the study. Natural gas forecasts for the general area to be served by the proposed pipeline were also presented. This report includes an introduction to the final gas resource and supply study as well as the regional geology relating to discovered and undiscovered resources. The following regions were included in the study area: onshore Mackenzie Delta including the Niglintgak, Parsons Lake and Taglu anchor fields; central Mackenzie Valley region extending from the Mackenzie Delta south to 63 degrees latitude; northern portion of the Yukon Territory; and, portions of the offshore Mackenzie Delta region limited to a water depth of 30 metres. Forecasts and economic analyses were prepared for the following 3 scenarios: contingent onshore resources only; contingent and prospective onshore resources; and, contingent and prospective onshore and offshore resources. Sensitivity forecasts were prepared for a fully expanded pipeline capacity of 1.8 bcf/day with an equal capacity gathering system. In addition, the National Energy Board estimates of resources for the 3 anchor field were used in place of the operator's estimates. A geological review was included for the plays in the study area. 15 refs., 43 tabs., 38 figs

  8. Assessing local resources and culture before instituting quality improvement projects.

    Hawkins, C Matthew

    2014-12-01

    The planning phases of quality improvement projects are commonly overlooked. Disorganized planning and implementation can escalate chaos, intensify resistance to change, and increase the likelihood of failure. Two important steps in the planning phase are (1) assessing local resources available to aid in the quality improvement project and (2) evaluating the culture in which the desired change is to be implemented. Assessing local resources includes identifying and engaging key stakeholders and evaluating if appropriate expertise is available for the scope of the project. This process also involves engaging informaticists and gathering available IT tools to plan and automate (to the extent possible) the data-gathering, analysis, and feedback steps. Culture in a department is influenced by the ability and willingness to manage resistance to change, build consensus, span boundaries between stakeholders, and become a learning organization. Allotting appropriate time to perform these preparatory steps will increase the odds of successfully performing a quality improvement project and implementing change. Copyright © 2014 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  9. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  10. Selecting downscaled climate projections for water resource impacts and adaptation

    Vidal, Jean-Philippe; Hingray, Benoît

    2015-04-01

    Increasingly large ensembles of global and regional climate projections are being produced and delivered to the climate impact community. However, such an enormous amount of information can hardly been dealt with by some impact models due to computational constraints. Strategies for transparently selecting climate projections are therefore urgently needed for informing small-scale impact and adaptation studies and preventing potential pitfalls in interpreting ensemble results from impact models. This work proposes results from a selection approach implemented for an integrated water resource impact and adaptation study in the Durance river basin (Southern French Alps). A large ensemble of 3000 daily transient gridded climate projections was made available for this study. It was built from different runs of 4 ENSEMBLES Stream2 GCMs, statistically downscaled by 3 probabilistic methods based on the K-nearest neighbours resampling approach (Lafaysse et al., 2014). The selection approach considered here exemplifies one of the multiple possible approaches described in a framework for identifying tailored subsets of climate projections for impact and adaptation studies proposed by Vidal & Hingray (2014). It was chosen based on the specificities of both the study objectives and the characteristics of the projection dataset. This selection approach aims at propagating as far as possible the relative contributions of the four different sources of uncertainties considered, namely GCM structure, large-scale natural variability, structure of the downscaling method, and catchment-scale natural variability. Moreover, it took the form of a hierarchical structure to deal with the specific constraints of several types of impact models (hydrological models, irrigation demand models and reservoir management models). The implemented 3-layer selection approach is therefore mainly based on conditioned Latin Hypercube sampling (Christierson et al., 2012). The choice of conditioning

  11. The family medicine curriculum resource project structural framework.

    Stearns, Jeffrey A; Stearns, Marjorie A; Davis, Ardis K; Chessman, Alexander W

    2007-01-01

    In the original contract for the Family Medicine Curricular Resource Project (FMCRP), the Health Resources and Services Administration (HRSA), Division of Medicine and Dentistry, charged the FMCRP executive committee with reviewing recent medical education reform proposals and relevant recent curricula to develop an analytical framework for the project. The FMCRP executive and advisory committees engaged in a review and analysis of a variety of curricular reform proposals generated during the last decade of the 20th century. At the same time, in a separate and parallel process, representative individuals from all the family medicine organizations, all levels of learners, internal medicine and pediatric faculty, and the national associations of medical and osteopathic colleges (Association of American Medical Colleges and the American Association of Colleges of Osteopathic Medicine) were involved in group discussions to identify educational needs for physicians practicing in the 21st century. After deliberation, a theoretical framework was chosen for this undergraduate medical education resource that mirrors the Accreditation Council for Graduate Medical Education (ACGME) competencies, a conceptual design originated for graduate medical education. In addition to reflecting the current environment calling for change and greater accountability in medical education, use of the ACGME competencies as the theoretical framework for the FMCR provides a continuum of focus between the two major segments of physician education: medical school and residency.

  12. Speculative resources of uranium. A review of International Uranium Resources Evaluation Project (IUREP) estimates 1982-1983

    1983-01-01

    On a country by country basis the International Uranium Resources Evaluation Project (IUREP) estimates 1982-1983 are reviewed. Information provided includes exploration work, airborne survey, radiometric survey, gamma-ray spectrometric survey, estimate of speculative resources, uranium occurrences, uranium deposits, uranium mineralization, agreements for uranium exploration, feasibilities studies, geological classification of resources, proposed revised resource range, production estimate of uranium

  13. Specifics of multi-project management: interaction and resources constraints

    Tsvetkova Nadezhda

    2017-01-01

    Full Text Available Multi-project management is fundamentally different from the control of a particular project or a set of slightly interconnected projects in terms of complexity and specifics. In multiproject management of the company production it is important to analyze the innovation interaction and its impact on the commercialization stage. A multiparameter factor of innovations interaction was introduced. The optimization problem which considers this factor was mathematically defined. The solution of this problem produces a schedule of innovations launches. This problem definition allows updating the objective function that corresponds to the aims of a manufacturing company. For example, it can help maximize the number of interdependent innovations with restrictions to current tangible and intangible resources or minimize the number of used tangible resources at a fixed number of innovations implemented. In order to verify the optimization problem an evolutionary approach based on genetic algorithm and local search is used. The verification was performed by the Solver a Microsoft Excel add-in. The readiness for practical use of the proposed solution was proved by the experiment.

  14. ORIGEN-based Nuclear Fuel Inventory Module for Fuel Cycle Assessment: Final Project Report

    Skutnik, Steven E. [Univ. of Tennessee, Knoxville, TN (United States). Dept. of Nuclear Engineering

    2017-06-19

    The goal of this project, “ORIGEN-based Nuclear Fuel Depletion Module for Fuel Cycle Assessment" is to create a physics-based reactor depletion and decay module for the Cyclus nuclear fuel cycle simulator in order to assess nuclear fuel inventories over a broad space of reactor operating conditions. The overall goal of this approach is to facilitate evaluations of nuclear fuel inventories for a broad space of scenarios, including extended used nuclear fuel storage and cascading impacts on fuel cycle options such as actinide recovery in used nuclear fuel, particularly for multiple recycle scenarios. The advantages of a physics-based approach (compared to a recipe-based approach which has been typically employed for fuel cycle simulators) is in its inherent flexibility; such an approach can more readily accommodate the broad space of potential isotopic vectors that may be encountered under advanced fuel cycle options. In order to develop this flexible reactor analysis capability, we are leveraging the Origen nuclear fuel depletion and decay module from SCALE to produce a standalone “depletion engine” which will serve as the kernel of a Cyclus-based reactor analysis module. The ORIGEN depletion module is a rigorously benchmarked and extensively validated tool for nuclear fuel analysis and thus its incorporation into the Cyclus framework can bring these capabilities to bear on the problem of evaluating long-term impacts of fuel cycle option choices on relevant metrics of interest, including materials inventories and availability (for multiple recycle scenarios), long-term waste management and repository impacts, etc. Developing this Origen-based analysis capability for Cyclus requires the refinement of the Origen analysis sequence to the point where it can reasonably be compiled as a standalone sequence outside of SCALE; i.e., wherein all of the computational aspects of Origen (including reactor cross-section library processing and interpolation, input and output

  15. Wisconsin's fourth forest inventory, 1983.

    John S. Jr. Spencer; W. Brad Smith; Jerold T. Hahn; Gerhard K. Raile

    1988-01-01

    The fourth inventory of the timber resource of Wisconsin shows that growing-stock volume increased from 11.2 to 15.5 billion cubic feet between 1968 and 1983, and area of timberland increased from 14.5 to 14.8 million acres. Presented are analysis and statistics on forest area and timber volume, growth, mortality, removals, and projections.

  16. EarthCube as an information resource marketplace; the GEAR Project conceptual design

    Richard, S. M.; Zaslavsky, I.; Gupta, A.; Valentine, D.

    2015-12-01

    Geoscience Architecture for Research (GEAR) is approaching EarthCube design as a complex and evolving socio-technical federation of systems. EarthCube is intended to support the science research enterprise, for which there is no centralized command and control, requirements are a moving target, the function and behavior of the system must evolve and adapt as new scientific paradigms emerge, and system participants are conducting research that inherently implies seeking new ways of doing things. EarthCube must address evolving user requirements and enable domain and project systems developed under different management and for different purposes to work together. The EC architecture must focus on creating a technical environment that enables new capabilities by combining existing and newly developed resources in various ways, and encourages development of new resource designs intended for re-use and interoperability. In a sense, instead of a single architecture design, GEAR provides a way to accommodate multiple designs tuned to different tasks. This agile, adaptive, evolutionary software development style is based on a continuously updated portfolio of compatible components that enable new sub-system architecture. System users make decisions about which components to use in this marketplace based on performance, satisfaction, and impact metrics collected continuously to evaluate components, determine priorities, and guide resource allocation decisions by the system governance agency. EC is designed as a federation of independent systems, and although the coordinator of the EC system may be named an enterprise architect, the focus of the role needs to be organizing resources, assessing their readiness for interoperability with the existing EC component inventory, managing dependencies between transient subsystems, mechanisms of stakeholder engagement and inclusion, and negotiation of standard interfaces, rather than actual specification of components. Composition of

  17. Inventory parameters

    Sharma, Sanjay

    2017-01-01

    This book provides a detailed overview of various parameters/factors involved in inventory analysis. It especially focuses on the assessment and modeling of basic inventory parameters, namely demand, procurement cost, cycle time, ordering cost, inventory carrying cost, inventory stock, stock out level, and stock out cost. In the context of economic lot size, it provides equations related to the optimum values. It also discusses why the optimum lot size and optimum total relevant cost are considered to be key decision variables, and uses numerous examples to explain each of these inventory parameters separately. Lastly, it provides detailed information on parameter estimation for different sectors/products. Written in a simple and lucid style, it offers a valuable resource for a broad readership, especially Master of Business Administration (MBA) students.

  18. Lithium Resources and Production: Critical Assessment and Global Projections

    Steve H. Mohr

    2012-03-01

    Full Text Available This paper critically assesses if accessible lithium resources are sufficient for expanded demand due to lithium battery electric vehicles. The ultimately recoverable resources (URR of lithium globally were estimated at between 19.3 (Case 1 and 55.0 (Case 3 Mt Li; Best Estimate (BE was 23.6 Mt Li. The Mohr 2010 model was modified to project lithium supply. The Case 1 URR scenario indicates sufficient lithium for a 77% maximum penetration of lithium battery electric vehicles in 2080 whereas supply is adequate to beyond 2200 in the Case 3 URR scenario. Global lithium demand approached a maximum of 857 kt Li/y, with a 100% penetration of lithium vehicles, 3.5 people per car and 10 billion population.

  19. Aleutian Islands Coastal Resources Inventory and Environmental Sensitivity Maps: M_MAMPT (Marine Mammal Points)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains biological resource data for seals and sea lions in the Aleutian Islands, Alaska. Points in this data set represent locations of haulout and...

  20. Aleutian Islands Coastal Resources Inventory and Environmental Sensitivity Maps: NESTS (Nest Polygons)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains biological resource data for alcids, shorebirds, waterfowl, diving birds, pelagic birds, gulls and terns in the Aleutian Islands, Alaska....

  1. Use of remote sensing techniques for inventorying and planning utilization of land resources in South Dakota

    Myers, V. I.; Frazee, C. J.; Rusche, A. E.; Moore, D. G.; Nelson, G. D.; Westin, F. C.

    1974-01-01

    The basic procedures for interpreting remote sensing imagery to rapidly develop general soils and land use inventories were developed and utilized in Pennington County, South Dakota. These procedures and remote sensing data products were illustrated and explained to many user groups, some of whom are interested in obtaining similar data. The general soils data were integrated with land soils data supplied by the county director of equalization to prepare a land value map. A computer print-out of this map indicating a land value for each quarter section is being used in tax reappraisal of Pennington County. The land use data provided the land use planners with the present use of land in Pennington County. Additional uses of remote sensing applications are also discussed including tornado damage assessment, hail damage evaluation, and presentation of soil and land value information on base maps assembled from ERTS-1 imagery.

  2. Assessment of the Nevada Test Site as a Site for Distributed Resource Testing and Project Plan: March 2002

    Horgan, S.; Iannucci, J.; Whitaker, C.; Cibulka, L.; Erdman, W.

    2002-05-01

    The objective of this project was to evaluate the Nevada Test Site (NTS) as a location for performing dedicated, in-depth testing of distributed resources (DR) integrated with the electric distribution system. In this large scale testing, it is desired to operate multiple DRs and loads in an actual operating environment, in a series of controlled tests to concentrate on issues of interest to the DR community. This report includes an inventory of existing facilities at NTS, an assessment of site attributes in relation to DR testing requirements, and an evaluation of the feasibility and cost of upgrades to the site that would make it a fully qualified DR testing facility.

  3. Projected radionuclide inventories of DWPF glass from current waste at time of production

    Plodinec, M.J.

    1993-01-01

    The Waste Acceptance Preliminary Specifications (WAPS) require that the DWPF estimate the inventory of long-lived radionuclides present in the waste glass, and report the values in the Waste Form Qualification Report. In this report, conservative (biased high) estimates of the radionuclide inventory of glass produced from waste currently in the Tank Farm are provided. In most cases, these calculated values compare favorably with actual data. In those cases where the agreement is not good, the values reported here are conservative

  4. NREL Solar Radiation Resource Assessment Project: Status and outlook

    Renne, D.; Riordan, C.; Maxwell, E.; Stoffel, T.; Marion, B.; Rymes, M.; Wilcox, S.; Myers, D.

    1992-05-01

    This report summarizes the activities and accomplishments of NREL's Solar Radiation Resource Assessment Project during fiscal year 1991. Currently, the primary focus of the SRRAP is to produce a 1961 - 1990 National Solar Radiation Data Base, providing hourly values of global horizontal, diffuse, and direct normal solar radiation at approximately 250 sites around the United States. Because these solar radiation quantities were measured intermittently at only about 50 of these sites, models were developed and applied to the majority of the stations to provide estimates of these parameters. Although approximately 93 percent of the data base consists of modeled data this represents a significant improvement over the SOLMET/ERSATZ 1952 - 1975 data base. The magnitude and importance of this activity are such that the majority of SRRAP human and financial resources were devoted to the data base development. However, in FY 1991 the SRRAP was involved in many other activities, which are reported here. These include the continued maintenance of a solar radiation monitoring network in the southeast United States at six Historically Black Colleges and Universities (HBCU's), the transfer of solar radiation resource assessment technology through a variety of activities, participation in international programs, and the maintenance and operation of NREL's Solar Radiation Research Laboratory.

  5. Airborne Geophysical/Geological Mineral Inventory CIP Program

    1999-01-01

    The Airborne-Geophysical/Geological Mineral Inventory project is a special multi-year investment to expand the knowledge base of Alaska's mineral resources and catalyze private-sector mineral development...

  6. Forest inventory in Myanmar

    Bo, Sit [Forest Resource Div., Forest Department (Myanmar)

    1993-10-01

    Forest inventory in Myanmar started in 1850s. Up till 1975, Myanmar Forest Department conducted forest inventories covering approximately one forest division every year. The National Forest Survey and Inventory Project funded by UNDP and assisted by FAO commenced in 1981 and the National Forest Management and Inventory project followed in 1986. Up till end March 1993, pre-investment inventory has covered 26.7 million acres, reconnaissance inventory 5.4 million acres and management inventory has carried out in 12 townships

  7. Forest inventory in Myanmar

    Sit Bo

    1993-01-01

    Forest inventory in Myanmar started in 1850s. Up till 1975, Myanmar Forest Department conducted forest inventories covering approximately one forest division every year. The National Forest Survey and Inventory Project funded by UNDP and assisted by FAO commenced in 1981 and the National Forest Management and Inventory project followed in 1986. Up till end March 1993, pre-investment inventory has covered 26.7 million acres, reconnaissance inventory 5.4 million acres and management inventory has carried out in 12 townships

  8. 78 FR 45960 - Notice of Inventory Completion: Missouri Department of Natural Resources, Jefferson City, MO

    2013-07-30

    ... Department of Natural Resources. If no additional requestors come forward, transfer of control of the human... to develop a sky-ride and tourist attraction, and five of the six mounds were destroyed. One..., and some human remains were displayed as a part of the tourist attraction. In 1995 and 1996, the City...

  9. 76 FR 36150 - Notice of Inventory Completion: Florida Department of State/Division of Historical Resources...

    2011-06-21

    ....A. Pound Human Identification Laboratory and Dr. John Krigbaum, University of Florida, Department of... described as a multi-component black earth midden deposit on a relict Everglades tree island, associated... to the Florida Department of State/Division of Historical Resources for identification pending...

  10. The Thai-Canadian nuclear human resources development linkage project

    Sumitra, Tatchai; Chankow, Nares; Bradley, K.; Bereznai, G.

    1998-01-01

    The Thai-Canadian Nuclear Human Resources Development Linkage Project (the P roject ) was initiated in 1994 in order to develop the engineering and scientific expertise needed for Thailand to decide whether and how the country can best benefit from the establishment of a nuclear power program. The Project was designed to upgrade current academics and people in industry, and to develop an adequate supply of new technical personnel for academic, industry, utility, regulatory and other government institutions. The key Project objectives included the establishment of a Chair in Nuclear Engineering at Chulalongkorn University, the upgrading of the current Masters level curriculum, the establishment of undergraduate and doctorate level curricula, development and delivery of an industrial training program for people in industry and government, exchanges of Thai and Canadian academics and industry experts to establish common research programs and teaching interests, and a public education program that was to test in Thailand some of the techniques that have been successfully used in Canada. (author)

  11. Integrating gender into natural resources management projects: USAID lessons learned.

    1998-01-01

    This article discusses USAID's lessons learned about integrating gender into natural resource management (NRM) projects in Peru, the Philippines, and Kenya. In Peru, USAID integrated women into a solid waste management project by lending money to invest in trash collection supplies. The loans allowed women to collect household waste, transfer it to a landfill, and provide additional sanitary disposal. The women were paid through direct fees from households and through service contracts with municipalities. In Mindanao, the Philippines, women were taught about the health impact of clean water and how to monitor water quality, including the monitoring of E. coli bacteria. Both men and women were taught soil conservation techniques for reducing the amount of silt running into the lake, which interferes with the generation of electricity and affects the health of everyone. The education helped women realize the importance of reducing silt and capitalized on their interest in protecting the health of their families. The women were thus willing to monitor the lake's water quality to determine if the conservation efforts were effective. In Kenya, USAID evaluated its Ecology, Community Organization, and Gender project in the Rift Valley, which helped resettle a landless community and helped with sustainable NRM. The evaluation revealed that women's relative bargaining power was less than men's. Organized capacity building that strengthened women's networks and improved their capacity to push issues onto the community agenda assured women a voice in setting the local NRM agenda.

  12. A GLOBAL ASSESSMENT OF SOLAR ENERGY RESOURCES: NASA's Prediction of Worldwide Energy Resources (POWER) Project

    Zhang, T.; Stackhouse, P. W., Jr.; Chandler, W.; Hoell, J. M.; Westberg, D.; Whitlock, C. H.

    2010-12-01

    NASA's POWER project, or the Prediction of the Worldwide Energy Resources project, synthesizes and analyzes data on a global scale. The products of the project find valuable applications in the solar and wind energy sectors of the renewable energy industries. The primary source data for the POWER project are NASA's World Climate Research Project (WCRP)/Global Energy and Water cycle Experiment (GEWEX) Surface Radiation Budget (SRB) project (Release 3.0) and the Global Modeling and Assimilation Office (GMAO) Goddard Earth Observing System (GEOS) assimilation model (V 4.0.3). Users of the POWER products access the data through NASA's Surface meteorology and Solar Energy (SSE, Version 6.0) website (http://power.larc.nasa.gov). Over 200 parameters are available to the users. The spatial resolution is 1 degree by 1 degree now and will be finer later. The data covers from July 1983 to December 2007, a time-span of 24.5 years, and are provided as 3-hourly, daily and monthly means. As of now, there have been over 18 million web hits and over 4 million data file downloads. The POWER products have been systematically validated against ground-based measurements, and in particular, data from the Baseline Surface Radiation Network (BSRN) archive, and also against the National Solar Radiation Data Base (NSRDB). Parameters such as minimum, maximum, daily mean temperature and dew points, relative humidity and surface pressure are validated against the National Climate Data Center (NCDC) data. SSE feeds data directly into Decision Support Systems including RETScreen International clean energy project analysis software that is written in 36 languages and has greater than 260,000 users worldwide.

  13. HHS Enterprise Data Inventory

    U.S. Department of Health & Human Services — The Enterprise Data Inventory (EDI) is the comprehensive inventory listing of agency data resources including public, restricted public, and non-public datasets.

  14. National Wetlands Inventory Polygons

    Minnesota Department of Natural Resources — Wetland area features mapped as part of the National Wetlands Inventory (NWI). The National Wetlands Inventory is a national program sponsored by the US Fish and...

  15. MX Siting Investigation. Water Resources Program Industry Activity Inventory, Nevada-Utah.

    1980-09-02

    Agua Caliente Existing 150 gpm *One of five sites shown on Plate II may be the site of this project. There are also three additional sites outside the...SOURCE: Wells WATER RECIRCULATED: 80%, hopefully WATER QUALITY: POTABLE : STOCK AGRICULTURE OTHER ? OPERATION - REOPENED: Reopened NEW: WATER...year _________ TYPE OF BENEFICIAL USE: __ * ~~WATER SOURCE: ____-____ WATER RECIRCULATED: ___ _____ WATER QUALITY: POTABLE : STOCK ___AGRICULTURE

  16. Integrated data base for 1993: US spent fuel and radioactive waste inventories, projections, and characteristics. Revision 9

    Klein, J.A.; Storch, S.N.; Ashline, R.C. [and others

    1994-03-01

    The Integrated Data Base (IDB) Program has compiled historic data on inventories and characteristics of both commercial and DOE spent fuel; also, commercial and U.S. government-owned radioactive wastes through December 31, 1992. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest U.S. Department of Energy/Energy Information Administration (DOE/EIA) projections of U.S. commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste (HLW), transuranic (TRU), waste, low-level waste (LLW), commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) LLW. For most of these categories, current and projected inventories are given through the calendar-year (CY) 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal.

  17. Integrated Data Base report--1993: U.S. spent nuclear fuel and radioactive waste inventories, projections, and characteristics. Revision 10

    1994-12-01

    The Integrated Data Base Program has compiled historic data on inventories and characteristics of both commercial and DOE spent nuclear fuel; also, commercial and US government-owned radioactive wastes through December 31, 1993. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, DOE Environmental Restoration Program wastes, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given the calendar-year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal. 256 refs., 38 figs., 141 tabs.

  18. Integrated Data Base report--1993: U.S. spent nuclear fuel and radioactive waste inventories, projections, and characteristics. Revision 10

    1994-12-01

    The Integrated Data Base Program has compiled historic data on inventories and characteristics of both commercial and DOE spent nuclear fuel; also, commercial and US government-owned radioactive wastes through December 31, 1993. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, DOE Environmental Restoration Program wastes, commercial reactor and fuel-cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given the calendar-year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal. 256 refs., 38 figs., 141 tabs

  19. Aircraft Emission Inventories Projected in Year 2015 for a High Speed Civil Transport (HSCT) Universal Airline Network. Final report

    Baughcum, S.L.; Henderson, S.C.

    1995-07-01

    This report describes the development of a three-dimensional database of aircraft fuel burn and emissions (fuel burned, NOx, CO, and hydrocarbons) from projected fleets of high speed civil transports (HSCT`s) on a universal airline network. Inventories for 500 and 1000 HSCT fleets, as well as the concurrent subsonic fleets, were calculated. The objective of this work was to evaluate the changes in geographical distribution of the HSCT emissions as the fleet size grew from 500 to 1000 HSCT`s. For this work, a new expanded HSCT network was used and flights projected using a market penetration analysis rather than assuming equal penetration as was done in the earlier studies. Emission inventories on this network were calculated for both Mach 2.0 and Mach 2.4 HSCT fleets with NOx cruise emission indices of approximately 5 and 15 grams NOx/kg fuel. These emissions inventories are available for use by atmospheric scientists conducting the Atmospheric Effects of Stratospheric Aircraft (AESA) modeling studies. Fuel burned and emissions of nitrogen oxides (NOx as NO2), carbon monoxide, and hydrocarbons have been calculated on a 1 degree latitude x 1 degree longitude x 1 kilometer attitude grid and delivered to NASA as electronic files.

  20. Integrated Data Base for 1992: US spent fuel and radioactive waste inventories, projections, and characteristics. Revision 8

    Payton, M. L.; Williams, J. T.; Tolbert-Smith, M.; Klein, J. A.

    1992-10-01

    The Integrated Data Base (IDB) Program has compiled current data on inventories and characteristics of commercial spent fuel and both commercial and US government-owned radioactive wastes through December 31, 1991. These data are based on the most reliable information available from government sources, the open literature, technical reports, and direct contacts. The information forecasted is consistent with the latest US Department of Energy/Energy Information Administration (DOE/EIA) projections of US commercial nuclear power growth and the expected DOE-related and private industrial and institutional (I/I) activities. The radioactive materials considered, on a chapter-by-chapter basis, are spent nuclear fuel, high-level waste, transuranic waste, low-level waste, commercial uranium mill tailings, environmental restoration wastes, commercial reactor and fuel cycle facility decommissioning wastes, and mixed (hazardous and radioactive) low-level waste. For most of these categories, current and projected inventories are given through the year 2030, and the radioactivity and thermal power are calculated based on reported or estimated isotopic compositions. In addition, characteristics and current inventories are reported for miscellaneous radioactive materials that may require geologic disposal.

  1. Inventory and Evaluation of Engineering Cultural Resources: Montgomery to Gadsden, Alabama Coosa River, Alabama,

    1981-03-01

    to retain some of its aesthetic quality. Important bridges were also being constructed outside of France. The Westminister Bridge (1738-50) was built... Legislative Session. It was eventually to connect the waters of Mobile Bay with the Coosa River at Wetumpka, and eventually with the Tennessee. The project...Bridge Act of 1927 were important legislative aids. The state act resulted in the construction of fifteen major bridges, including the attractive

  2. Knowledge inventory for resource efficiency measures in existing buildings; Kunskapsinventering avseende resurseffektiviserande aatgaerder inom befintlig bebyggelse

    Jarnehammar, Anna; Kildsgaard, Ivana; Prejer, Erik

    2011-07-01

    The report summarizes the state of knowledge for various renovation measures of apartment buildings built between 1941-1980. The renovation potential is estimated to give half the energy use for heating and hot water. This efficiency improvement is considered possible, but not likely. There are many case studies of individual projects with theoretical calculations of renovation potential for different measures. There are relatively many general studies of the housing stock in general where the potential for various measures have been calculated for the whole of Sweden, but few studies of actual projects completed. Binding minimum requirements related to the Energy Performance of Buildings Directive (EPBD) for buildings for renovation has been introduced in several other countries in the EU which is also found to contribute to more energy-efficient measures introduced in major renovation projects. The key measures that we have found is the introduction of FTX system, renovation of the building envelope as well as individual metering and billing of heating and hot water.

  3. Uranium resources inventory on systematic prospection stage at Jumbang II Sector West Kalimantan

    Subiantoro, Lilik; Paimin; Suripto; Widito, P.; Marzuki, Anang

    2002-01-01

    Some uranium occurrences have been discovered as mineralized outcrops and soils at Jumbang II sector. The aim of this investigation is to find the mineralization characteristic, geometric and distribution and resources estimation. The investigation method is systematic topographic, geologic, and radiometric mapping and identification of uranium on the geological aspect. At Jumbang II have been identified four mineralization zones within total area 8.56 hectare. The mineralization zones consist of quartzite rock associations. The quartzite is characterized by the existence of some mineralized veins. The veins contain uraninite and secondary uranium mineral autunite and gummite, and it also contains monazite, tourmaline, biotite, feldspar, quartz, zircon, and some ore minerals. The ore minerals consist of molybdenite, pyrrhotite, magnetite, pyrite, hematite, chalcopyrite, galena, sphalerite and arsenopyrite. Uranium content of quartzite is about 28 ppm to 18,500 ppm U (A zone), 1,125.9 ppm U (B zone) and 515 ppm U (C and D zone). The lateral and vertical ore distributions are locally. The mineralization is veins type and is controlled by intersection WNW-ESE, NNE-EEW structure direction, which was vertical to sub vertical fractures. Resources potential within 80-m depth is 3,106.893 tons U metal

  4. An inventory control project in a major Danish company using compound renewal demand models

    Larsen, Christian; Seiding, Claus Hoe; Teller, Christian

    2008-01-01

    procedures for determining suitable inventory control variables based on the fitted demand distributions and a service-level requirement stated in terms of an order fill rate. Finally, we validated the results of our models against the procedures that had been in use in the company. It was concluded...

  5. Project Re-ed: increase in self-esteem as measured by the Coopersmith Inventory.

    Friedman, S; Rogers, P P; Gettys, J

    1975-02-01

    A group of boys and girls (9 to 15 yr. of age) who were identified as emotionally disturbed and in residential enrollment at a short-term (2 to 15 mo.) high-impact residential treatment center displayed a significant gain on the Coopersmith Self-esteem Inventory. Of the 59 children 37 showed a gain; 19 showed a decrease.

  6. Italian National Forest Inventory: methods, state of the project, and future developments

    Giovanni Tabacchi; Flora De Natale; Antonio Floris; Caterina Gagliano; Patrizia Gasparini; Gianfranco Scrinzi; Vittorio Tosi

    2007-01-01

    A primary objective of the Italian National Forest Inventory (NFI) is to provide information required by the Kyoto Protocol and the Ministerial Conference on the Protection of Forests in Europe in relation to sustainable forest management practices. For this reason, the second Italian NFI was aimed at providing data in a way that is consistent with the international...

  7. Cotton gin trash in the western United States: Resource inventory and energy conversion characterization

    Haase, S.G.; Quinn, M.W.; Whittier, J.P. [NEOS Corp., Lakewood, CO (United States); Cohen, T.M.; Lansford, R.R. [New Mexico State Univ., Las Cruces, NM (United States); Craig, J.D. [Cratech Inc., Tahoka, TX (United States); Swanson, D.S.; Morgan, G. [Western Regional Biomass Energy Program, Golden, CO (United States)

    1993-12-31

    The disposal of wastes associated with the processing of cotton is posing increasing problems for cotton gin operators in the western United States. Traditional disposal methods, such as open-air incineration and landfilling are no longer adequate due to increasing environmental concerns. This paper evaluates the technical, economic and environmental feasibility for cotton gin trash to serve as an energy resource. Cotton gin trash has been quantified, by county, in the five cotton-growing states of the western United States. The energy conversion technology that appears to offer the most promise is gasification. An economic evaluation model has been developed that will allow gin operators to analyze their own situation to determine the profitability of converting gin trash to energy.

  8. Evaluation and recommendations concerning the visual resource inventory and evaluation systems used within the forest service and the bureau of land management

    Blaise George Grden

    1979-01-01

    This paper is an investigation of the Visual Management System (VMS) and the Visual Resource Inventory and Evaluation Process (VRIEP). Questionnaires were developed and sent to persons who were experienced with VMS and/or VRIEP. VMS has been found easier to under-stand and apply than VRIEP. The methodology of VRIEP has been found to he a more complete approach than...

  9. Historic, enthnohistoric and prehistoric cultural resource inventory. Final technical report, November 1980-May 1982

    1982-01-01

    The goal of this study is to provide a literature search and write a historical narrative of the cultural significance of the study area for the proposed WyCoalGas Inc., pipeline, railroad, well fields, and coal gasification plant. The request for a cultural resource investigation states at a minimum the study shall be a literature search on the narrow one mile corridor along the proposed pipelines, areas included within the various facilities plus a one mile buffer surrounding these facilities. In addition, the study must be tied into appropriate local, state, and national history. The writer of this history has felt a responsibility for providing a realistic assessment of the themes of the study area's historical development. Several ideas have been concentrated upon: its American Indian heritage; the Euro-American's exploitive relationship with the region; and the overriding fragile, arid nature of its land. It is hoped that the government agencies and ultimately the energy company will feel a similiar responsibility toward the study area's historical integrity.

  10. Detailed prospective stages of inventory of U resources in Mentawa and Seruyan, Center of Kalimantan

    Ramadanus; Sudjiman; Agus, S.

    1996-01-01

    Indication of U mineralization in granite biotite 1.500 cps and metasilt boulders 500 cps - 15.000 cps was found in Mentawa River. This detailed examination was done with the aim to gather geological information and U mineralization and to obtain knowledge about potential U resources. Methods used were geological mapping, the radiometric measuring and peeling the chosen outcrop samples were taken from outcrop and anomaly boulders, and stream sediment as mud and heavy minerals. This research was backed up with laboratory analysis in the form of petrography, mineragraphy, autoradiography, total and mobile U content. The result of this research stratigraphy of Mentawa and Seruyan which consisted of schist and tonalite. Outcrop of U mineralization was found in schist in the from of uraninite generally, filled up SSE-NNW subvertical-vertical dipping. Boulder of U mineralizations was found in the from of uraninite, gumite and autonite associated with turmaline. Those U mineralizations mentioned were found in Mentawa Satu River and upper reaches of Rengka River with distribution width + 7 km 2

  11. The U resources inventory at Tebalungkang sector, west Kalimantan systematic prospection stage

    Soetopo, B.; Suripto; Boman; Sajiyo

    1996-01-01

    The systematic prospection at Tebalungkang sector, West Kalimantan was carried out to characterize the occurrence of U mineralization and to invent the potential U resources at the area. The investigation was done on the basis of previous results, i.e. radiometric anomalous outcrops and boulders of 1000-7000 C/s. The methods for the investigation was systematic geological mapping and radiometric measurements of soil and tranced rocks and supported by mineralogical and geochemical analyses. The results of the investigation show that this area consists of metamorphic rocks, intruded by granite quartz-diorite batholites and dike of andesite and lamprophyre. From geological structure this is 30 o plunging from anticlin NE-SW and NNW-SSE, is crossed by NE-SW and E-W normal faults and NW-SE and WNW-ESE strike slip faults. Uranium mineralization appears in quartz-schist brecciated and quachitite (lamprophyre). The radioactive minerals were thorite and monazite, associated with rutile, ilmenite, magnetite, hematite, pyrite, calcopyrite, muscovite, apatite and allanite. The U content from rock samples has been found to be 4,5-54,75 ppm U

  12. National Wetlands Inventory Lines

    Minnesota Department of Natural Resources — Linear wetland features (including selected streams, ditches, and narrow wetland bodies) mapped as part of the National Wetlands Inventory (NWI). The National...

  13. 78 FR 8192 - Agency Information Collection Activities: Comment Request; Education and Human Resources Project...

    2013-02-05

    ... NATIONAL SCIENCE FOUNDATION Agency Information Collection Activities: Comment Request; Education and Human Resources Project Monitoring Clearance AGENCY: National Science Foundation. ACTION: Notice... study will assess the implementation of resources, models, and technologies to determine how and why...

  14. Penerapan Sistem Informasi Penjualan dan Inventori HANDPHONE serta Aksesorisnya Menggunakan Enterprise Resource Planning(ERP (Studi Kasus : Toko Nahda Cell

    Aries Munandar AM

    2016-08-01

    Full Text Available Saat ini proses bisnis yang berjalan di Toko Handphone Nahda Cell belum terkomputerisasi. Semua transaksi masih menggunakan blangko faktur. Laporan Penjualan dan Stok barang masih menggunakan pencatatan secara manual dibuku. Hal ini tentu akan berakibat terhadap pelayanan dan pembukuan yang tidak baik pada toko tersebut. Untuk itu diperlukan solusi agar permasalahan itu dapat diatasi. Salah satunya dengan penerapan sistem informasi menggunakan aplikasi Enterprise Resource Planning (ERP. Aplikasi ERP ini dapat dirancang sendiri dan dapat juga menggunakan aplikasi yang open source. Penerapan ERP pada Toko Nahda Cell menggunakan ERP yang bersifat Open Source Software (OSS. Tahapan yang dilakukan dalam penerapannya dimulai dengan studi pendahuluan, selanjutnya studi literatur digunakan untuk mencari landasan teori dan penelitian terdahulu tentang penerapan sistem ERP, mengidentifikasi proses bisnis inventory dan penjualan barang yang sedang berjalan kemudian membuatkan usulan sistem secara terkomputerisasi, yang digambarkan dengan menggunakan Business Process Model Notation (BPMN, serta penggambaran model kerja sistem yang akan diterapkan menggunakan use case diagram. Kemudian tahapan selanjutnya adalah melakukan analisis pemilihan Aplikasi ERP OSS, penerapan aplikasi dan pengujian aplikasi. Hasil penelitian ini menunjukkan bahwa aplikasi ERP OSS yang dipilih dapat memberikan solusi terhadap permasalahan yang dihadapi toko Handphone Nahda Cell.

  15. Compilation Of An Econometric Human Resource Efficiency Model For Project Management Best Practices

    G. van Zyl; P. Venier

    2006-01-01

    The aim of the paper is to introduce a human resource efficiency model in order to rank the most important human resource driving forces for project management best practices. The results of the model will demonstrate how the human resource component of project management acts as the primary function to enhance organizational performance, codified through improved logical end-state programmes, work ethics and process contributions. Given the hypothesis that project management best practices i...

  16. Mammalian Survey Techniques for Level II Natural Resource Inventories on Corps of Engineers Projects (Part 1)

    2009-07-01

    sheep (Ovis dalli dalli), mountain goats (Oreamnos americanus) and other hoofed animals are often surveyed using aerial counts from fixed-wing...Society Bulletin 34:69-73. Hilty, J. A., and A. M. Merenlender. 2004. Use of riparian corridors and vineyards by mammalian preda- tors in northern...Witmer, and R. M. Engeman. 2004. Feral swine impacts on agriculture and the environment. Sheep and Goat Research Journal 19:34-40. Slade, N. A., and

  17. Cultural Resources Inventory of the Montz Freshwater Diversion Project Corridor, St. Charles Parish, Louisiana. Volume 1.

    1986-06-23

    o’uisiana. Genealogical Publishing Company, Inc., Baltimore. Din, Gilbert C. (editor) 1917 Louisiana in 1776: A Memoria of Francisco Bouliiney...of Engineers. Shelford, Victor E. 1963 The Ecology of North America. University o- T-IlinoTis Press, Urbana . Sitterson, J. Carlyle 1953 Sugar

  18. An Application of BLM's Riparian Inventory Procedure to Rangeland Riparian Resources in the Kern and Kaweah River Watersheds

    Patricia Gradek; Lawrence Saslaw; Steven Nelson

    1989-01-01

    The Bakersfield District of the Bureau of Land Management conducted an inventory of rangeland riparian systems using a new method developed by a Bureau-wide task force to inventory, monitor and classify riparian areas. Data on vegetation composition were collected for 65 miles of streams and entered into a hierarchical vegetation classification system. Ratings of...

  19. Classification of human- and automated resource allocation approaches in multi-project management

    Ponsteen, A.; Kusters, R.J.; Pasian, B.; Storm, P.

    2015-01-01

    Managing a multi-project environment requires a different method than managing a single project. The main challenge of managing a multi-project environment is the allocation of scarce human resources over the projects in execution. As part of a broader research on this topic, the aim of this paper

  20. The analysis of MS Project Server platform for managing of human resources in multiproject environment

    Kadunc, Boštjan

    2009-01-01

    Effective project management requires qualified project managers, who must have complete control over their projects, so they can perform fluently. For easier and more effective project management, we can use various software solutions. In my graduation thesis I focused on working with resources - detecting and resolving their over-allocation. For their regulation I have used Microsoft Office Project Professional 2007 in connection with Microsoft Office Project Server 2007. My goal wa...

  1. Leadership and Human Resource Management in Project Circumstances

    Fadjar, Adnan

    2008-01-01

    Leadership is a very important issue in any organizations. The complexity of a project makes the role of the project manager as the leader even more challenging because he/she has to work in an organization which has relatively short time period and dealing with many people who come from various backgrounds. This paper discusses various theories of leadership and proposes their application in project circumstances. As It is often said that the project management is effective if it can manage ...

  2. INVENTORY OF ECOSYSTEM RESTORATION PROJECTS - PUBLISHED ON THE OFFICE OF WATER WEB PAGE

    USEPA's National Risk Management Research Laboratory working jointly with the Office of Water, has developed an Internet-accessible database of ecosystem restoration projects within the Mid-Atlantic Integrated Assessment (MAIA) region. This article informs project owners of the i...

  3. TWRS privatization support project waste characterization resource dictionary

    Patello, G.K.; Wiemers, K.D.

    1996-09-01

    A single estimate of waste characteristics for each underground storage tanks at the Hanford Site is not available. The information that is available was developed for specific programmatic objectives and varies in format and level of descriptive detail, depending on the intended application. This dictionary reflects an attempt to define what waste characterization information is available. It shows the relationship between the identified resource and the original data source and the inter-relationships among the resources; it also provides a brief description of each resource. Developed as a general dictionary for waste characterization information, this document is intended to make the user aware of potenially useful resources

  4. The Italian bat roost project: a preliminary inventory of sites and conservation perspectives

    Gruppo Italiano di Ricerca sui Chirotter GIRC

    2005-01-01

    Full Text Available Abstract The Italian bat roost project, launched by the Italian Chiroptera Research Group (GIRC, aims to develop a constantly updated national database of bat roosts. Short-term objectives are to inventory roosts and identify the most important ones from a conservation perspective, in order to set priorities for management actions. Published records and field data from 1990 onwards are filed. To date, the database contains 1243 records from 750 roosts, covering 352 10x10 km UTM grid-cells. Among roosts, 167 were used for hibernation (S roosts, 244 for breeding (R roosts and 431 as either temporary roosts or for unknown needs, not verified or not considered in the survey (X roosts. Roosting sites occurred in buildings (45.1%, caves (35.3%, artificial underground sites (10.3%, trees (5.5%, bridges (2.1%, bat boxes (1.3% and rocky cliffs (0.4%. At least 29 species were found, and the number of roosts per species ranged between 1 and 261. S and/or R roosts fulfilling certain combinations of number of species and individuals or having at least 50 individuals of species cited in Annex II of the 92/43/EEC Directive (excluding Miniopterus schreibersii, adding Myotis punicus were classified as sites of special conservation interest. When meeting at least one such conditions, type X roosts that were not classified as either S or R, were considered potential sites of special conservation interest, for which further data collection is recommended. In all, 97 roosts of special conservation interest were identified: 30 S roosts, 60 R roosts and 7 roosts selected for both hibernation and breeding. 20 X roosts were identified as potential sites of special conservation interest. For at least 93.7% of roosts, factors potentially harming the bats were documented, particularly people access to the roost, and renovation of buildings used as a roost. In almost two thirds of such cases it was judged that conservation was not ensured

  5. Amoco/Environmental Protection Agency Pollution Prevention Project, Yorktown refinery. Refinery release inventory. Final report

    Klee, H.; Kizier, G.J.; Baloo, S.; Hockman, E.L.; Couzens-Roberts, C.

    1992-07-01

    The report volume summarizes physical data obtained during a 2-year pollution prevention study of Amoco Oil Company's Yorktown Virginia Refinery. The study was jointly sponsored as a cooperative effort of Amoco Corporation and the United States Environmental Protection Agency. A multi-media sampling program was used to identify potential pollution sources within the Refinery. Sampling and analysis included air, surface water, groundwater, and solid waste data. Public perceptions about environmental issues of concern in the vicinity of the Refinery were also surveyed. The inventory showed that nearly 99 percent of the releases were airborne at the facility. Most of the remainder involved land disposal of solid wastes. Specific sources of major pollutants are identified

  6. OER, Resources for Learning--Experiences from an OER Project in Sweden

    Ossiannilsson, Ebba S. I.; Creelman, Alastair M.

    2012-01-01

    This article aims to share experience from a Swedish project on the introduction and implementation of Open Educational Resources (OER) in higher education with both national and international perspectives. The project, "OER--resources for learning", was part of the National Library of Sweden Open Access initiative and aimed at exploring, raising…

  7. Toward a Framework for Resource Efficiency Evaluation in Industry: Recommendations for Research and Innovation Projects

    Sophie Sfez

    2017-01-01

    Full Text Available The world is facing a tremendous resource supply challenge. One strategy of regions and nations to address this issue is to encourage research and innovation through funding programs. Most of the time, these programs require that research and innovation projects quantify potential increases in resource efficiency achieved by the projects. However, no consensus exists on how to calculate resource efficiency; therefore, a wide range of approaches is followed. As a result, resource efficiency results are not comparable between projects, and because no rules or guidelines exist to help project developers, the approach followed is not always appropriate. This paper aims to discuss the existing approaches and methods used to evaluate resource efficiency. In this context, resource efficiency is defined as the ratio between the benefits obtained from resources and the impact or amount of resources used. The most challenging step is the determination of this ratio’s denominator because a wide range of methods to quantify resource consumption exist and are being used. They can be classified as gate-to-gate or life cycle based methods and can be subdivided into accounting methods and impact assessment methods. Each method considers different aspects of resources; thus, no single method aims to answer the same research questions. Therefore, project developers must make a well informed choice about which method to use. This paper provides recommendations to support this choice, as well as the overall evaluation and the valorization of the resource efficiency ratio in the framework of research and innovation programs.

  8. Compilation Of An Econometric Human Resource Efficiency Model For Project Management Best Practices

    G. van Zyl

    2006-11-01

    Full Text Available The aim of the paper is to introduce a human resource efficiency model in order to rank the most important human resource driving forces for project management best practices. The results of the model will demonstrate how the human resource component of project management acts as the primary function to enhance organizational performance, codified through improved logical end-state programmes, work ethics and process contributions. Given the hypothesis that project management best practices involve significant human resource and organizational changes, one would reasonably expect this process to influence and resonate throughout all the dimensions of an organisation.

  9. Solving Multi-Resource Constrained Project Scheduling Problem using Ant Colony Optimization

    Hsiang-Hsi Huang

    2015-01-01

    Full Text Available This paper applied Ant Colony Optimization (ACO to develop a resource constraints scheduling model to achieve the resource allocation optimization and the shortest completion time of a project under resource constraints and the activities precedence requirement for projects. Resource leveling is also discussed and has to be achieved under the resource allocation optimization in this research. Testing cases and examples adopted from the international test bank were studied for verifying the effectiveness of the proposed model. The results showed that the solutions of different cases all have a better performance within a reasonable time. These can be obtained through ACO algorithm under the same constrained conditions. A program was written for the proposed model that is able to automatically produce the project resource requirement figure after the project duration is solved.

  10. Resource Planning and Management: Job One for Software Project Managers

    2011-05-01

    negotiation based on mutual understanding of and belief i th j t t t i lAcceptancen e pro ec managemen r ang e – Project leaders need to communicate...Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that...puts the figure at $1.22 T (even more zeros) Constant barrage of project doom and gloom Optimize tomorrow today.TM …. Reasons for Project

  11. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Guatemala

    1977-08-01

    Before 1959 a private individual (Mr. Rene Abularach) is reported to have made an airborne radiometric survey of the Sierra de las Minas and Sierra Madre Ranges. Although many anomalies were detected by this survey, none were verified in the ground survey followup, despite apparently adequate flight control. In 1968 a United Nations Special Fund Mineral Survey Project completed over 1,000 km of carborne radiometric survey with geiger counter readings at 500 m intervals. No anomalies were detected, but background radioactivity for several formations and geologic environments was established. In 1969 the Guatemalan government solicited the IAEA for technical assistance In conducting a preliminary uranium favorability study designed to formulate recommendations for a national radioactive ore prospecting program. A carborne radiometric survey was made of environments theoretically favorable for uranium deposition, with spot geological and radiometric examinations being .conducted in the more favorable areas. All Important mining regions of Guatemala except the leterites and the ultrabasics were visited. No evidence of a uranium province was observed 1n these field investigations and the recommendation was made that the government not embark on a more detailed national prospecting program at that time. At the time of completion of the IAEA-Guatemalan government (GOG) reconnaissance program in 1971, no uranium reserves or resources were known. More recent information on uranium occurrences and resources 1n Guatemala does not appear to be available. Information on more recent uranium reconnaissance than that undertaken during 1971 IAEA-GOG study is lacking. However, in more recent years the country's mineral potential has been generally evaluated with the aid of the UN and ICAITI (Central American Research Institute for Industry). Except for quarry materials, the state owns all minerals. The state has priority on purchase of any mineral production needed for the country

  12. Forest Inventory-based Projection Systems for Wood and Biomass Availability

    Barreiro, Susana; Schelhaas, M.; McRoberts, Ronald E.; Kändler, Gerald

    2017-01-01

    Well-managed forests and woodlands are a renewable resource, producing essential
    raw material with minimum waste and energy use. Rich in habitat and species diversity, forests may contribute to increased ecosystem stability. They can absorb the effects of unwanted deposition and other

  13. Danish-Czech wind resource know-how transfer project. Interim report 2002

    Rathmann, O.; Noergaerd, P.; Frandsen, S.

    2003-12-01

    The progress of the Danish-Czech Wind Resource Know-how Transfer Project is reported. The know-how transfer component of the project has consisted in performing a wind resource training workshop for about 13 individuals from the Czech Republic, ranging from scientists to wind farm project developers, and in donating modern software for evaluating wind resources. The project has also included a review of a Czech overview-study of wind speeds inside the country as well as a study of the electricity tariffs and their impact on wind energy utilization in the Czech Republic. A problematic existing Czech wind farm project, locked up in a no-production situation, was also addressed. However, this situation turned out to be related to problems with economy and owner-ship to a higher degree than to low wind resources and technical problems, and it was not possible for the project to point out a way out of this situation. (au)

  14. The Development of Digital Collections and Resources Organization Related Projects in Taiwan

    Hsueh-Hua Chen

    2001-12-01

    Full Text Available With the development of Internet, digital libraries/museums have received worldwide attention and many developed countries are doing extensive researches on digital libraries/museums. In Taiwan, many institutions have digitized their rare collections. This paper introduces the recent development of digital projects in Taiwan, including: Digital Museum Project, National Digital Collection Project and National Culture Database Project, and also especially introduces some resources organization related projects. [Article content in Chinese

  15. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Taiwan

    1977-12-01

    Taiwan is an island of 36,000 sq km located 160 km east of mainland China. Geologically, the oldest rocks are Tertiary, and the only igneous rocks on the island are Quaternary andesites and basalts. Copper, gold, and silver are the only known metallic minerals produced. Uranium occurrences and exploration efforts are unknown. The potential uranium resource of Taiwan is considered a category 1 resource. (author)

  16. Research on evaluating water resource resilience based on projection pursuit classification model

    Liu, Dong; Zhao, Dan; Liang, Xu; Wu, Qiuchen

    2016-03-01

    Water is a fundamental natural resource while agriculture water guarantees the grain output, which shows that the utilization and management of water resource have a significant practical meaning. Regional agricultural water resource system features with unpredictable, self-organization, and non-linear which lays a certain difficulty on the evaluation of regional agriculture water resource resilience. The current research on water resource resilience remains to focus on qualitative analysis and the quantitative analysis is still in the primary stage, thus, according to the above issues, projection pursuit classification model is brought forward. With the help of artificial fish-swarm algorithm (AFSA), it optimizes the projection index function, seeks for the optimal projection direction, and improves AFSA with the application of self-adaptive artificial fish step and crowding factor. Taking Hongxinglong Administration of Heilongjiang as the research base and on the basis of improving AFSA, it established the evaluation of projection pursuit classification model to agriculture water resource system resilience besides the proceeding analysis of projection pursuit classification model on accelerating genetic algorithm. The research shows that the water resource resilience of Hongxinglong is the best than Raohe Farm, and the last 597 Farm. And the further analysis shows that the key driving factors influencing agricultural water resource resilience are precipitation and agriculture water consumption. The research result reveals the restoring situation of the local water resource system, providing foundation for agriculture water resource management.

  17. A STUDY ON OPTIMISATION OF RESOURCES FOR MULTIPLE PROJECTS BY USING PRIMAVERA

    B. S. K. REDDY

    2015-02-01

    Full Text Available Resources play vital role in construction projects. The performance of construction industry depends chiefly on how best the resources are managed. Optimisation play pivotal role in resource management, but task is highly haphazard and chaotic under the influence of complexities and vastness. Management always looks for optimum utility of resources available with them. Hence, the project management has got important place especially in resource allocation and smooth functioning with allocated budget. To achieve these goals and to exercise enhance optimisation certain tools are used for resource allocation optimally. Present work illustrates resource optimisation exercises on two ongoing projects in Dubai, UAE. Resource demands of project A & B are individually levelled and observed cumulative requirement is 17475. In other option demands of projects A & B are aggregated and then together levelled, the necessary resource observed is 16490. Comparison of individually levelled and then combined option with aggregated and then levelled clearly indicates reduction in demand of resources by 5.65% in later option, which could be best considered for economy.

  18. Heuristic algorithm for single resource constrained project scheduling problem based on the dynamic programming

    Stanimirović Ivan

    2009-01-01

    Full Text Available We introduce a heuristic method for the single resource constrained project scheduling problem, based on the dynamic programming solution of the knapsack problem. This method schedules projects with one type of resources, in the non-preemptive case: once started an activity is not interrupted and runs to completion. We compare the implementation of this method with well-known heuristic scheduling method, called Minimum Slack First (known also as Gray-Kidd algorithm, as well as with Microsoft Project.

  19. Optimizing strategy for repetitive construction projects within multi-mode resources

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of a contractor’s view such as: proposed project duration with corresponding gross value and cash flows. Cash flow analysis of construction projects has a long history and has been an important topic in construction management. Determination of project cash flows is very sensitive, especially for repetitive construction projects. This paper focuses on how to calculate tender data for repetitive construction projects such as: project duration, project cost, project/bid price, project cash flows, project maximum working capital and project net present value that is equivalent to net profit at the beginning of the project. A simplified multi-objective optimization formulation will be presented that creates best tender data to contractor comparing with more feasible options that are generated from multi-mode resources in a given project. This mathematical formulation is intended to give more scenarios which provide a practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price and project maximum working capital while maximizing its net present value simultaneously. At the end of the paper, an illustrative example will be presented to demonstrate the applications of proposed technique to an optimization expressway of repetitive construction project.

  20. Market Design Project. Demand Response Resources in Sweden - a summary

    Fritz, Peter

    2006-06-01

    An important discussion in later years has been whether the necessary reserves in the electricity market are to be generated through normal market mechanisms, i.e. with the price as the primary controlling parameter, or if it requires a collectively financed capacity reserve and how regulations in such a case should be shaped. The issue is first and foremost a matter of where the line is drawn between that which 'the market' should handle and that which can be assured through regulation. Autumn 2002 Svenska Kraftnaet (the Swedish TSO) presented an investigation to the government in which it was suggested that the capacity balance should primarily be managed through the use of normal pricing mechanisms, but that the state should strengthen responsibility for the nation's capacity balance in the period up until 2008. When approaching an effect loss situation, spot prices and balancing power prices will skyrocket. Today, most people are in agreement that a condition for maintained delivery safety is that normal pricing mechanisms are in place and that consumption actually is affected by high prices. The main reason for this conclusion is that it is very expensive to keep production facilities in reserve for situations that are expected to occur very seldom - it is cheaper to encourage large customers to reduce their consumption. The other reason is that increased price sensitivity creates conditions for a more stable and more predictable pricing development in strained situations. While being aware that a response to increased demand is needed, we see too little of that on the market today. The aim of this project is to present concrete measures that will awaken this slumbering resource. In order to judge how much demand response that can reasonably be expected and if there is any financial gain for customers, electricity suppliers and grid operators; it has been necessary to cast a few predictions about future price peaks. We estimate price peaks in the 3-10 SEK

  1. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Australia

    1977-08-01

    In Australia most exploration for uranium has been conducted by companies and individuals. The geological mapping and airborne radiometric surveying conducted by the BMR is made available to interested persons. Exploration for uranium in Australia can be divided into two periods - 1947 to 1961 and 1966-1977. During the first period the Commonwealth Government introduced measures to encourage uranium exploration including a system of rewards for the discovery of uranium ore. This reward system resulted in extensive activity by prospectors particularly in the known mineral fields. Equipped with a Geiger counter or scintillometer, individuals with little or no experience in prospecting could compete with experienced prospectors and geologists. During this period several relative small uranium deposits were discovered generally by prospectors who found outcropping mineralisation. The second phase of uranium exploration in Australia began in 1966 at which time reserves amounted to only 6,200 tonnes of uranium and by 3 977 reserves had been increased to 289,000 tonnes. Most of the exploration was done by companies with substantial exploration budgets utilising more advanced geological and geophysical techniques. In the field of airborne radiometer the development of multi-channel gamma ray spectrometers with large volume crystal detectors increased the sensitivity of the tool as a uranium detector and resulted in several major discoveries. Expenditure or exploration for uranium increased from 1966 to 1971 but has declines in recent years. After listing the major geological elements of Australia, its uranium production and resources are discussed. During the period 1954-71 the total production of uranium concentrate in Australia amounted to 7,780 tonnes of uranium, and was derived from deposits at Rum Jungle (2,990 tonnes U) and the South Alligator River (610 tonnes U) in the Northern Territory, Mary Kathleen (3,460 tonnes U) in Queensland and Radium Hill (720 tonnes U

  2. Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: A dynamic forward approach

    Aidin Delgoshaei

    2016-09-01

    Full Text Available Purpose: The issue resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating drawback is frequently seen after scheduling of a project in practice which causes a schedule to be useless. Modifying an over-allocated schedule is very complicated and needs a lot of efforts and time. In this paper, a new and fast tracking method is proposed to schedule large scale projects which can help project engineers to schedule the project rapidly and with more confidence. Design/methodology/approach: In this article, a forward approach for maximizing net present value (NPV in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF is proposed. The progress payment method is used and all resources are considered as pre-emptible. The proposed approach maximizes NPV using unscheduled resources through resource calendar in forward mode. For this purpose, a Genetic Algorithm is applied to solve. Findings: The findings show that the proposed method is an effective way to maximize NPV in MRCPSP-DCF problems while activity splitting is allowed. The proposed algorithm is very fast and can schedule experimental cases with 1000 variables and 100 resources in few seconds. The results are then compared with branch and bound method and simulated annealing algorithm and it is found the proposed genetic algorithm can provide results with better quality. Then algorithm is then applied for scheduling a hospital in practice. Originality/value: The method can be used alone or as a macro in Microsoft Office Project® Software to schedule MRCPSP-DCF problems or to modify resource over-allocated activities after scheduling a project. This can help project engineers to schedule project activities rapidly with more accuracy in practice.

  3. The Azimuth Project: an Open-Access Educational Resource

    Baez, J. C.

    2012-12-01

    The Azimuth Project is an online collaboration of scientists, engineers and programmers who are volunteering their time to do something about a wide range of environmental problems. The project has several aspects: 1) a wiki designed to make reliable, sourced information easy to find and accessible to a technically literate nonexperts, 2) a blog featuring expository articles and news items, 3) a project to write programs that explain basic concepts of climate physics and illustrate principles of good open-source software design, and 4) a project to develop mathematical tools for studying complex networked systems. We discuss the progress so far and some preliminary lessons. For example, enlisting the help of experts outside academia highlights the problems with pay-walled journals and the benefits of open access, as well as differences between how software development is done commercially, in the free software community, and in academe.

  4. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Syria

    1977-11-01

    Very little information is available to IAEA on the geology and uranium potential of Syria. In 1975 a contract was awarded to Huntings Geology and Geophysics Ltd by the Ministry of Petroleum and Mineral Resources to carry out a study of the country's mineral resources with particular reference to phosphate uranium, chrome and industrial materials. The results of this survey are not known. Apart from the assumption of some possibility of uranium recovery as a by-product from phosphate production it is assumed that the Speculative Potential is likely to be less than 1000 tonnes uranium. (author)

  5. Analysis of the impact of the Dutch Heat Act on projects and an inventory of stakeholders

    Budding, B.; Gerrits, W.; Grootscholten, C.

    2010-08-01

    The Dutch Heat Act was adopted by the Dutch Lower Chamber in February 2009. The main aim of the Act is reliable delivery of heat at reasonable prices and conditions to protect the consumer. The Dutch Ministry of Economic Affairs commissioned a study on the effect of the Heat Act on investment decisions for new heat projects, encompassing a quantitative and a qualitative assessment. [nl

  6. Combat Resource Management (11bm) Applied Research Project (ARP)

    2009-12-01

    tactiques de combat embarquées, comme partie du processus C2 naval militaire, définit un domaine application qui implique à la fois des décideurs humains ...combat ships defending against incoming threats and where coordination of their respective resources is a complex problem of capital importance...the case of the several frigates defending against incoming threats, multi-agent coordi- nation is a complex problem of capital importance. Better

  7. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Thailand

    1977-08-01

    Thailand is a country with an area of 514?000 square kilometres situated in the centre of continental south-east Asia, The geology of Thailand is very varied with sedimentary formations ranging from Cambrian to Quaternary in age and including sandstones, shales, limestones of many varieties. Among the igneous rocks, granites are very important and rhyolites, tuffs diorites, basalts and ultrabasic rocks also exist. Tin is the most important mineral occurrence. Available information on the geology and mineral resources suggests that the country may contain significant resources of radioactive minerals. Favourable potential host types are; 1) uranium and thorium in monazite in beach sands and tin placer deposits; 2) uranium in sandstones, principally in Jurassic sandstones of the Khorat Plateau; 3) uranium in Tertiary lignite deposits; 4) uranium in veins in granites; 5) uranium related to fluorite deposits; 6) uranium in black shales and phosphates. Uranium mineralization in sedimentary rocks at Phu Wieng was discovered in 1970. The area has been radiometrically grid mapped and limited shallow drilling has shown continuity.of the narrow, carbonaceous, conglomeratic sandstone host bed. No uranium reserves or resources can be stated at the present time, but the favourable geology of the Khorat Plateau, the known uranium occurrence and the very small exploration coverage is possibly indicative of a good future potential. The Speculative Potential is estimated to be between 1000 and 10,000 tonnes uranium. (author)

  8. WHE-PAGER Project: A new initiative in estimating global building inventory and its seismic vulnerability

    Porter, K.A.; Jaiswal, K.S.; Wald, D.J.; Greene, M.; Comartin, Craig

    2008-01-01

    The U.S. Geological Survey’s Prompt Assessment of Global Earthquake’s Response (PAGER) Project and the Earthquake Engineering Research Institute’s World Housing Encyclopedia (WHE) are creating a global database of building stocks and their earthquake vulnerability. The WHE already represents a growing, community-developed public database of global housing and its detailed structural characteristics. It currently contains more than 135 reports on particular housing types in 40 countries. The WHE-PAGER effort extends the WHE in several ways: (1) by addressing non-residential construction; (2) by quantifying the prevalence of each building type in both rural and urban areas; (3) by addressing day and night occupancy patterns, (4) by adding quantitative vulnerability estimates from judgment or statistical observation; and (5) by analytically deriving alternative vulnerability estimates using in part laboratory testing.

  9. Forest inventories generate scientifically sound information on the forest resource, but do our data and information really matter?

    Christoph Keinn; Goran Stahl

    2009-01-01

    Current research in forest inventory focuses very much on technical-statistical problems geared mainly to the optimization of data collection and information generation. The basic assumption is that better information leads to better decisions and, therefore, to better forest management and forest policy. Not many studies, however, strive to explicitly establish the...

  10. Success probability orientated optimization model for resource allocation of the technological innovation multi-project system

    Weixu Dai; Weiwei Wu; Bo Yu; Yunhao Zhu

    2016-01-01

    A success probability orientated optimization model for resource al ocation of the technological innovation multi-project system is studied. Based on the definition of the technological in-novation multi-project system, the leveling optimization of cost and success probability is set as the objective of resource al ocation. The cost function and the probability function of the optimization model are constructed. Then the objective function of the model is constructed and the solving process is explained. The model is applied to the resource al ocation of an enterprise’s technological innovation multi-project system. The results show that the pro-posed model is more effective in rational resource al ocation, and is more applicable in maximizing the utility of the technological innovation multi-project system.

  11. Backgrounder : 1998 historic resources overview assessment, Churchill River power project

    1999-01-01

    A survey was conducted to gather information regarding the history of land-use of the Innu Nation of Labrador. The survey was made possible through research into land use and documentary sources plus the analysis of geomorphologic features and air photos. The areas of the survey included portions of the Strait of Belle Isle, Churchill Valley, proposed transmission routes of the Churchill Power Project, and survey lines at Atikonak Lake. Over 65 historical and traditional land-use sites were recorded, including two major Hudson Bay Company fur-trading posts in the Churchill Valley. This survey will be important in helping to ensure that important sites are not destroyed as a result of the proposed Churchill Power Project

  12. International Uranium Resources Evaluation Project (IUREP) national favourability studies: India

    1977-08-01

    Physiographically India has a total area of 3,268,010 km 2 in three distinct regions. 1. The Peninsular shield in the south with an area of 823,310 km 2 . 2. The Himalayan mountain system with an area of 1,797,200 km 2 . 3. The Indo-Gangetic alluvial plain with an area of 647,500 km 2 . The three presently recognised major uranium provinces in India are: 1. The Singhbhum uranium province; 2. The Rajasthan uranium province, 3. The Madhya Pradesh uranium province. The Atomic Minerals Division of the Department of Atomic Energy has carried out a vigorous exploration programme since 1949 but despite their efforts a great deal of ground has still to be explored. At present, structurally controlled deposits account for most of the uranium resources of India. Uranium occurrences and deposits have been outlined in (1) Vein type deposits (the Singhbhum belt), (2) Conglomerate (Karnataka and Udaipur area, Raiasthan), (3) Sandstones (Madhra Pradesh and Swaliks, Himachal Pradesh, (4) Others such as carbonatites, marine phosphates, etc, (Mussorrie - Sahasradhara In Uttar Pradesh and Chatterpur-Saucur in Madhya Pradesh), (5) By-product Uranium in copper tailings and beach sands. India's total resources are listed as 52,538 tonnes uranium (68,300 short tons U 3 O 8 ) with additional resources from monazite of 12700 tonnes uranium. In view of the wide geological favourability, the many types of occurrences already known and the vast areas of unexplored ground it is estimated that the Speculative Potential may be between 150,000 and 250,000 tonnes uranium which is Category 5. (author)

  13. Considerations in the environmental assessment of resource projects

    Alvarez, P.R.

    1999-01-01

    A broad view is sketched of what needs to happen for Canada's petroleum industry to become a major player in Canada's emerging north, the Northwest Territories and the Yukon Territory. Industry needs to see more clarity and certainty about regulations and timelines, land claim settlements and their implementation, and the resolution of jurisdictional overlaps before it will commit the long-term investment dollars that will provide lasting and environmentally sustainable benefits for northeners. After years of being written off by many industry observers, the two territories have seen a sudden change recently. Oil and gas prices began to recover just when Chevron announced the results of its K-29 well, one of the most prolific wells in the Fort Liard area uncovering a reservoir containing up to 600 billion cubic feet of natural gas. Many companies are prospecting in the area. Given this vast potential, the question has to be asked: Why is so little money being spent developing these resources while billions are being spent in the frontier off Canada's east coast. The answer is location and timing. Some related problems of the lack of infrastructure and the shortage of trained workers are a natural phase of developing a new frontier. What resource development investors have difficulty tolerating is the ongoing uncertainty about access to the resource base and often protracted time for decisions. Such investors need to know clearly and quickly what are the rules, costs and timelines of doing business in the north. Industry in the north has to be responsible and sensitive to the environment and the unique culture and aspirations of northeners, and governments and regulatory bodies have to quickly and clearly simplify the approval process so that the petroleum industry is willing to risk the long-term investments needed to develop this new frontier

  14. NEW ATTRACTION MECHANISM OF INVESTMENT RESOURCES FOR FINANCING INFRASTRUCTURE PROJECTS

    A. S. Popkova

    2013-01-01

    Full Text Available The paper analyzes revenue-yielding bonds as an efficient tool of governmental and municipal management. Conditions required for issue of  security papers have considered in the paper. The paper describes main  stages of the infrastructure bonded loan implementation. The global experience in financing construction and upgrading of infrastructure facilities through the bond issue has been investigated in the paper. The contains an analysis of risks while executing infrastructure projects and proposes methods for their minimization.

  15. Impact of water control projects on fisheries resources in Bangladesh

    Mirza, Monirul Qader; Ericksen, Neil J.

    1996-07-01

    Bangladesh is a very flat delta built up by the Ganges—Brahmaputra—Meghna/Barak river systems. Because of its geographical location, floods cause huge destruction of lives and properties almost every year. Water control programs have been undertaken to enhance development through mitigating the threat of disasters. This structural approach to flood hazard has severely affected floodplain fisheries that supply the major share of protein to rural Bangladesh, as exemplified by the Chandpur Irrigation Project. Although the regulated environment of the Chandpur project has become favorable for closed-water cultured fish farming, the natural open-water fishery loss has been substantial. Results from research show that fish yields were better under preproject conditions. Under project conditions per capita fish consumption has dropped significantly, and the price of fish has risen beyond the means of the poor people, so that fish protein in the diet of poor people is gradually declining. Bangladesh is planning to expand water control facilities to the remaining flood-prone areas in the next 15 20 years. This will cause further loss of floodplain fisheries. If prices for closed-water fish remain beyond the buying power of the poor, alternative sources of cheap protein will be required.

  16. Natural resource inventory and monitoring for Ulaan Taiga Specially Protected Areas—An assessment of needs and opportunities in northern Mongolia

    Moore, Peggy E.; Meyer, Joseph B.; Chow, Leslie S.

    2017-03-10

    Between 1997 and 2011, Mongolia established three specially protected areas in the north-central part of the country to protect various high-value resources. These areas are jointly referred to as the Ulaan Taiga Specially Protected Areas. In accordance with the goals of the draft general management plan, this report identifies options for initiating an inventory and monitoring program for the three protected areas. Together, the three areas comprise over 1.5 million hectares of mountainous terrain west of Lake Hovsgol and bordering the Darkhad Valley. The area supports numerous rare ungulates, endangered fish, and over 40 species of threatened plants. Illegal mining, illegal logging, and poaching pose the most immediate threats to resources. As a first step, a review of published literature would inform natural resource management at the Ulaan Taiga Specially Protected Areas because it would inform other inventories.Vegetation classification and mapping also would inform other inventory efforts because the process incorporates geographic analysis to identify environmental gradients, fine-scale sampling that captures species composition and structure, and landscape-scale results that represent the variety and extent of habitats for various organisms. Mapping using satellite imagery reduces the cost per hectare.Following a determination of existing knowledge, field surveys of vertebrates and vascular plants would serve to build species lists and fill in gaps in existing knowledge. For abiotic resources, a focus on monitoring air quality, evaluating and monitoring water quality, and assembling and storing weather data would provide information for correlating resource response status with changing environmental conditions.Finally, we identify datasets that, if incorporated into a geographic information system, would inform resource management. They include political boundaries, infrastructure, topography, surficial geology, hydrology, fire history, and soils.In terms

  17. Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources Projects

    2006-09-01

    ERDC/TN ANSRP-06-3 September 2006 Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources...Cole, R. A. (2006). “ Freshwater aquatic nuisance species impacts and management costs and benefits at Federal Water resources projects,” ANSRP...Projects1 by Richard A. Cole THE ISSUE: A small fraction of the species that inhabit the nation’s fresh waters become aquatic nuisance species (ANS

  18. Resource Letter MP-2: The Manhattan project and related nuclear research

    Reed, B. Cameron

    2011-02-01

    This Resource Letter is a supplement to my earlier Resource Letter MP-1 and provides further sources on the Manhattan Project and related nuclear research. Books and journal articles are cited for the following topics: General works, technical works, biographical and autobiographical works, foreign wartime programs and allied intelligence, technical papers of historical interest, and postwar policy and technical developments. I also give a list of videos and websites dealing with the Manhattan Project, nuclear weapons, and nuclear issues.

  19. Inventory and projection of greenhouse gases emissions for Sumatera Utara Province

    Ambarita, H.; Soeharwinto; Ginting, N.; Basyuni, M.; Zen, Z.

    2018-03-01

    Greenhouse Gases (GHGs) emissions which result in global warming is a serious problem for the human being. Total globally anthropogenic GHG emissions were the highest in the history of the year 2000 to 2010 and reached 49 (4.5) Giga ton CO2eq per year in 2010. Many governments addressed their commitment to reducing GHG emission. The Government of Indonesia (GoI) has released a target in reducing its GHG emissions by 26% from level business as usual by 2020, and this target can be increased up to 41% by international aid. In this study, the GHG emissions for Sumatera Utara province are assessed and divided into six sectors. They are Agricultural, Land Use and Forestry, Energy, Transportation, Industrial, and Waste sectors. The results show that total GHG emissions for Sumatera Utara province in the baseline year 2010 is 191.4 million tons CO2eq. The business-as-usual projection of the GHG emission in 2020 is 354.5 million tons CO2eq. Mitigation actions will reduce GHG emissions up to 30.5% from business as usual emission in 2020.

  20. Project Galaxy - Sustianable Resource Supply and Environmental Implications

    Downing, Mark [ORNL; Wimmer, Robert [Toyota Motor Corp.

    2012-03-01

    sustainability effects as a result of providing renewable energy is complex. We have only included in this report environmental effects as a result of producing biomass for the biorefinery, and the area represented by the footprint of the biorefinery itself. In doing this, we have defined critical environmental variables (water, soil, air, and flora and fauna) and discussed some measurable indicators used to quantify effects such as nitrate content, soil organic matter, air particulates, and avian species diversity, respectively. We also point out the need to perform specific sustainability risk assessments, and the need to continually evaluate the life cycle inventory with an accompanying life-cycle assessment. Only in this dynamic framework can environmental sustainability be determined, evaluated and assessed, and contrasted with economic sustainability goals of a firm or an industry.

  1. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Italy

    1977-10-01

    The Italian Republic comprises a 1200 - Km - long peninsula ex- tending from southern Europe into the Mediterranean Sea, and a number of adjacent islands, among which the principals are Sicily and Sardinia. The total area is in excess of 300,000 Sq.Km, the islands account for some 50, 000 Sq.Km. From a physiographic and morphologic point of view, Italy mainly consists of the Alpine region and the Po valley to the North and of the Appennine range and small Coastal plains to the Centre and South. Plains occupied only 20% of the total area, hills and mountains, up to 4,810 m of elevation, contribute almost equally to the remaining 80%. The most promising uranium mineralizations have been found in the Bergamasc Alps, near the small town of Novazza. Pitchblende and minor sphalerite (formation temperature, 80 deg. - 100 deg. C) occur disseminated in volcanics of permian age. The host rocks at the Novazza uranium deposit, consist of an acid ignimbrite with cineritic texture. The rocks have been affected by metasomatism which brought abundant neo-formation minerals such as silica, sericite, carbonates and minor adularia, albite and muscovite. The reasonably assured resources of the Novazza deposit have been estimated to be 1,200 ton of U having a grade of 900 p.p.m. U. Estimated additional resources are 1,000 ton U. Production is scheduled to start in 1980

  2. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Jordan

    1977-08-01

    Jordanian geology is dominated by the Great Rift Valley System. Most of the country is covered by Cretaceous and Eocene sediments, largely sandstones and limestones. These include phosphorates and bituminous limestones in the Upper Cretaceous, South of the Dead Sea, Mesozoic and Paleozoic rocks overlie exposed granitic Pre Cambrian basement rocks carrying many minor intrusives . Phosphates provide the main mineral export of Jordan. The Natural Resources Authority (Geological Survey and Bureau of Mines) initiated a survey in 1972 of the distribution of uranium on the phosphorite horizon. In 1974 the Survey calculated that the uranium content of the phosphate areas surveyed up to that time was 5 million metric tonnes U 3 O 8 . The average U 3 O 8 content is approximately 0.02% U 3 O 8 . The exploitation of such resources would be as a byproduct of the phosphate industry and dependent on the rate of phosphate production and the capacity of triple super-phosphate plants, none of which exist at the present time. In the southern area in Paleozoic and Pre Cambrian areas there are some hopes of conventional type deposits being found but the potential appears to be small. (author)

  3. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Canada

    1977-08-01

    Exploration for mineral deposits in Canada resulted in the discovery of large uranium deposits, such as at Great. Bear Lake, Northwest Territories (1930), in the Elliot Lake area, Ontario (1949); Beaverlodge, Wollaston Lake Fold Belt and Carswell Structure in Saskatchewan (1946-1975) and many uranium occurrences in the Canadian Shield, in the Orogenic Belts and in the Platforms. Uranium output in Canada since 1942 until and including 1976 amounted to 112,000 tonnes U. Reasonably Assured uranium resources as of 1976 amounted to 167,000 tonnes U (at a price up to $40/lb. U 3 0 8 ) and 15,000 tonnes U (at a price more than $40 up to $60/lb. U 3 O 8 ). Estimated Additional uranium resources as of 1976 amounted to 392,000 tonnes U (at a price up to $40/lb. U-Og) and 264,000 tonnes U (at a price more than $40 up to $60/lb. U 3 0 8 ). Possible further potential beyond the above mentioned classes is tentatively estimated to be in the 6th category according to NEA/IAEA favourability classification. (author)

  4. Flexible resource management and its effect on project cost and duration

    Pinha, Denis C.; Ahluwalia, Rashpal S.

    2018-06-01

    In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported in the literature is presented to demonstrate the capabilities of this method. As for practical implications, this approach enhances the decision-making process which results in improved solutions in terms of total project duration and cost. From an academic viewpoint, this paper adds empirical evidence to enrich the existing literature, as it highlights relevant issues to model properly the complexity of real-life projects.

  5. Midwest Forensics Resource Center Project Summary June 2005

    David Baldwin

    2005-06-01

    The mission of the MFRC Research and Development Program, is to provide technological advances in forensic science for the benefit of our regional partners as well as the forensic community at large. Key areas of forensic science need are identified through our interactions with our Midwest partners and our R&D advisory group, as well as through our participation in national meetings in forensic science. Under the sponsorship of the National Institute of Justice, the MFRC solicits proposals for the development of practical and useful technology, instrumentation, and methodology that address needs in areas related to forensic science and its application to operational crime laboratories. The MFRC facilitates proposal development by working to establish partnerships between researchers and our regional partners. The MFRC administers a peer-review of the proposals and then funds the selected projects at a cost of approximately $55,000 each, with a 12-month period of performance. The process for selection of these projects includes the following steps: (1) drafting of a call for proposals by MFRC staff, (2) review of the draft call by members of the R&D advisory committee, (3) review and approval of the call by NIJ, (4) issuance of the call to ISU, Ames Laboratory, regional partners, and research organizations, (5) receipt of proposals, (6) review of proposals by R&D advisory committee, (7) ranking and selection by MFRC staff using advisory committee reviews, with concurrence by NIJ, (8) notification of proposers, (9) receipt and review of progress reports by MFRC, (10) receipt and review of final reports by MFRC, R&D advisory committee, and NIJ. The decision to fund any specific project is based upon a peer-reviewed call-for-proposal system administered by the MFRC. The reviewers are crime laboratory specialists and scientists who are asked to rate the proposals on four criteria areas including: (1) relevance to the mission of the MFRC, (2) technical approach and

  6. Copper Mountain, Wyoming, intermediate-grade uranium resource assessment project. Final report. National Uranium Resource Evaluation

    Madson, M.E.; Ludlam, J.R.; Fukui, L.M.

    1982-11-01

    Intermediate-grade uranium resources were delineated and estimated for Eocene and Precambrian host rock environments in the 39.64 mi 2 Copper Mountain, Wyoming, assessment area. Geologic reconnaissance and geochemical, geophysical, petrologic, borehole, and structural data were interpreted and used to develop a genetic model for uranium mineralization in these environments. Development of a structural scoring system and application of computer graphics in a high-confidence control area established the basis for estimations of uranium resources in the total assessment area. 8 figures, 5 tables

  7. The 2001 activities and the 3rd workshop of the human resources development project in FNCA

    2002-07-01

    In 1999, the Project for Human Resources Development (HRD) was initiated as defined in the framework of the Forum for Nuclear Cooperation in Asia (FNCA), organized by the Atomic Energy Commission of Japan. The objective of the HRD Project is to solidify the foundation of technologies for nuclear development and utilization in Asia by promoting human resources development in Asian countries. In the Project are two kinds of activity; In-workshop activity and Outside-of-workshop activity. The 3rd Workshop on Human Resources Development in the Nuclear Field was held on October 29 to November 1, at the Nuclear Training Center of KAERI. Participating countries were China, Indonesia, Republic of Korea, Japan, Malaysia, the Philippines, Thailand, and Vietnam. The secretariat for the Human Resources Development Project is provided by the Nuclear Training Center of the Korea Atomic Energy Research Institute and the Nuclear Technology and Education Center of the Japan Atomic Energy Research Institute. This report consists of presentation papers and materials at the Workshop as In-Workshop Activity, a document of project review on Human Resources Development for the fourth Coordinators Meeting of FNCA at Tokyo on March, 2002, a letter of proposal from the Project Leader of Japan to the project leaders of the participating countries, and training materials of participating countries as Outside-Workshop Activity. (author)

  8. Project profile of crystl. Land resources information service

    1986-04-01

    The US Department of Energy (DOE) plans to locate one high-level nuclear waste repository in the eastern United States by the year 2000. Current plans call for this repository to be located in crystalline rock formations. North Carolina is one of seventeen states with crystalline rock bodies that are under study. DOE is evaluating the geological aspects of the rock bodies as well as the impact a repository will have on the natural and cultural resources of the area. Funds have been granted to North Carolina from DOE to allow the state to review DOE's findings. A portion of these funds have been used to build digital geographic datasets that are being used for this evaluation and review. This report summarizes the data collected and methods used in entering them into the computer

  9. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Sikkim

    1977-11-01

    Sikkim is a country in the eastern Himalayas and is bound on the west by Nepal, on the north by Tibet, on the east by Bhutan and on the south by India. Precambrian Darjeeling gneiss forms the rim of the amphitheatre while schists of Late Precambrian to Lower Paleozoic rocks form tee habital interior. A small outcrop of carboniferous to Permain methomorphic rocks is preserved in the Tista Basin as well in a thin outcrop trust upon fluvitile beds of Sivalik which is mostly of Pliestocene age. Imbricate thrusts have stacked the rocks in a vast heap where reverse metamorphism is common. Ni information is available concerning uranium occurrences and resources as well as past and present explorations. The uranium potential of Sikkim is almost zero

  10. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Iraq

    1977-11-01

    Iraq consists of a lowland trough lying between asymmetrical and very different upland massifs to the east, north and west and continuing southeastwards to the Persian Gulf. The region is one of crustal weakness and subsidence with relatively young plastic sedimentary rocks engulfed in downwarped, ancient, rigid and highly resistant blocks. Exploration in the 1954-55 period found some minor radioactive anomalies and very low uranium contents in limestones and phosphates. The results of an aerial radiometric survey in 1973-74 are not known to IAEA. Iraq has no reported uranium resources but there are several favourable formations which warrant a detailed survey. In view of the size of the country and the small amount of systematic exploration carried out up to the present time, the Speculative Potential is considered to lie in the 1,000 to 10,000 tonnes uranium category. (author)

  11. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Belgium

    1977-12-01

    Uranium occurrences and resources - To date the uranium identified in Belgium is limited to a number of occurrences and none of these have as yet proved significant from a reserve or resource viewpoint. The main uranium occurrences ares (1) In the Upper Cambrian graphite schists corresponding to the culm of Sweden small zones are found (30 - 50 cm thick) with an average of 20 ppm uranium. (2) Near Vise at the base of the Carboniferous the Visean formation is discordantly superimposed on the Permian (Frasnian) and overlain by shales and phyllites. Solution pockets at the boundary contain phosphatic lenses that contain uranium values of up to 200 ppm. Autunite and Torbernite are the main uranium minerals associated with a number of complex phosphatic minerals. Within the Chalk (Maestrichtien) of the Mons basin, that is mainly in the Ciply - St. Symphorien and Baudow district. Here is found enrichment of uranium up to 140 ppm over large areas related to phosphatic chalk. The thickness of the zone varies from a few to 20 metres. However, as the P 2 O 5 content is not high enough for the deposits to be exploited at present for phosphate there is little possibility of the uranium being concentrated at high enough levels to be exploited for itself alone. (4) Near to Vielsalm (in the Stavelot Massif) are some thin quartz veins containing small amounts of copper and uranium minerals (Torbornite). Values of up to 70 ppm are recorded. (5) A number of low uranium values are recorded associated with phosphatic nodules and zones in the Lower Pleistocene and Tertiary

  12. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Nigaragua

    1977-08-01

    On invitation of the Nicaraguan Government, the U. S. Atomic Energy Commission conducted a reconnaissance for uranium in March, 1953. Operating and abandoned mines, as well as prospects, formations, contacts, dikes and sills enroute to these mines were tested by scintillometer. Reconnaissance included two mineralized areas exposed in windows within the volcanic belt but did not include the schists and granitic intrusions in the north eastern part of the country. No anomalous radioactivity was detected. No uranium occurrences were discovered during the 1953 reconnaissance and no uranium deposits or prospects are indicated on the metallogenetic map of Central America or in the bibliography of Nicaraguan geology. Information is net available on current exploration in Nicaragua. All subsoil mineral resources besides quarry materials belong to the state. In the interest of national defence, uranium, thorium, lithium and their derivatives, along with certain other mineral substances, may be classified as o f temporary strategic interest , and their exploration or exploitation would then be subject to special laws. The Ministry of Economy may establish permanent or temporary national reserves on which mining activities are essentially precluded. Foreign nationals and corporations may acquire mineral concessions although particular regulations may be applicable to such an acquisition. Exploration of any favourable formations has been hindered by volcanic ash cover in western Nicaragua and dense vegetation in the East. Little geologic work has been done on the Paleozoic metamorphic rocks or Todos Santos Formation of the Northern Highlands. These could possibly show some potential for discovery of uranium as might the alaskites near Siuna. The potential resources of Nicaragua are estimated at less than 1,000 tonnes uranium

  13. The Frustrated Nerds Project--Resources for Systems Administrators in Higher Education: A Resource Webliography

    Henninger, Jessamyn; Aber, Susan Ward

    2010-01-01

    Systems Architects and Information Technology administrators working in higher education help faculty, staff, and student computer users. Yet, who helps them? What resources do these professionals value? A case study was conducted using purposeful sampling and data collection through electronic interview to gather the preferred information-seeking…

  14. Exploiting Growing Stock Volume Maps for Large Scale Forest Resource Assessment: Cross-Comparisons of ASAR- and PALSAR-Based GSV Estimates with Forest Inventory in Central Siberia

    Christian Hüttich

    2014-07-01

    Full Text Available Growing stock volume is an important biophysical parameter describing the state and dynamics of the Boreal zone. Validation of growing stock volume (GSV maps based on satellite remote sensing is challenging due to the lack of consistent ground reference data. The monitoring and assessment of the remote Russian forest resources of Siberia can only be done by integrating remote sensing techniques and interdisciplinary collaboration. In this paper, we assess the information content of GSV estimates in Central Siberian forests obtained at 25 m from ALOS-PALSAR and 1 km from ENVISAT-ASAR backscatter data. The estimates have been cross-compared with respect to forest inventory data showing 34% relative RMSE for the ASAR-based GSV retrievals and 39.4% for the PALSAR-based estimates of GSV. Fragmentation analyses using a MODIS-based land cover dataset revealed an increase of retrieval error with increasing fragmentation of the landscape. Cross-comparisons of multiple SAR-based GSV estimates helped to detect inconsistencies in the forest inventory data and can support an update of outdated forest inventory stands.

  15. Report on the EMBER Project--A European Multimedia Bioinformatics Educational Resource

    Attwood, Terri K.; Selimas, Ioannis; Buis, Rob; Altenburg, Ruud; Herzog, Robert; Ledent, Valerie; Ghita, Viorica; Fernandes, Pedro; Marques, Isabel; Brugman, Marc

    2005-01-01

    EMBER was a European project aiming to develop bioinformatics teaching materials on the Web and CD-ROM to help address the recognised skills shortage in bioinformatics. The project grew out of pilot work on the development of an interactive web-based bioinformatics tutorial and the desire to repackage that resource with the help of a professional…

  16. Human resource management in the project-oriented organization: Employee well-being and ethical treatment

    Turner, R.; Huemann, M.; Keegan, A.

    2008-01-01

    As part of a wider study into human resource management (HRM) practices in project-oriented organizations, we investigated the issue of employee well-being. Project-oriented organizations adopt temporary work processes to deliver products and services to clients. This creates a dynamic work

  17. Resource Letter MP-1: The Manhattan Project and related nuclear research

    Reed, B. Cameron

    2005-09-01

    This Resource Letter provides a guide to literature on the Manhattan Project and related nuclear research. Books and journal articles are cited for the following topics: general works, technical works, biographical and autobiographical works, the German nuclear program, and technical papers of historical interest. A list of videos and websites dealing with the Manhattan Project, nuclear weapons, and nuclear issues is also given.

  18. Project of an information integrated system to provide support to the regulatory control of the radioactive waste inventory

    Christovao, Marilia Tavares

    2005-05-01

    Sources and radioactive waste deriving from industry activities, medical practice and other areas are collected, received, and stored as waste on Brazilian Nuclear Energy Commission (CNEN) Institutes, that also generate, treat and store their own radioactive waste. The object of this project is to present an Integrated Information System named SICORR, having as guidelines, the referred processes to the radioactive waste regulatory control, under the responsibility of the Radioactive Waste Division (DIREJ), the General Coordination of Licensing and Control (CGLC), the Directorate of Safety and Radiation Protection (DRS) and the CNEN. The main objective of the work was reached, once the project SICORR modeling considers the radioactive waste control inventory, enclosing the treatment and integration of the radioactive waste and the radionuclides data and processes; the installations that produce, use, transport or store radiation sources data; and, CNEN Institutes responsible for the radioactive waste management data. The SICORR functions or essential modules involve the data treatment, integration, standardization and consistency between the processes. The SICORR specification and the analysis results are registered in documents, Software Specification Proposal (PESw) and Software Requirements Specification (ERSw), and are presented in text, in diagrams and user interfaces. Use cases have been used in the SICORR context diagram. The user interfaces for each use case have been detailed, defining the graphical layout, the relationships description with other interfaces, the interface details properties and the commands and the product entrances and exits. For objects radioactive waste and radionuclides, states diagrams have been drawn. The activities diagram represents the business model process. The class diagram represents the static objects and relationships that exist between them, under the specification point of view. The class diagram have been determined

  19. Resource Letter MP-3: The Manhattan Project and Related Nuclear Research

    Reed, B. Cameron

    2016-10-01

    This Resource Letter is a supplement to the earlier Resource Letters MP-1 and MP-2, and provides further sources on the Manhattan Project and related research. Books, review papers, journal articles, videos, and websites are cited for the following topics: general works, technical works, biographical and autobiographical works, foreign wartime nuclear programs and related allied intelligence, the use of the bombs against Hiroshima and Nagasaki, technical papers of historical interest, postwar policy and technical developments, and educational materials. Together, these three Resource Letters describe nearly 400 sources of information on the Manhattan Project.

  20. Energy saving and emission reduction: A project of coal-resource integration in Shanxi Province, China

    Zhang Jianjun; Fu Meichen; Geng Yuhuan; Tao Jin

    2011-01-01

    The small or middle coal mines with illegal operations in developing countries or regions can cause bad energy waste and environmental disruption. The project of coal-resource integration in Shanxi Province of China gives a new idea or an approach to energy saving and emission reduction. It is a social- and economic-ecological project. The paper shows the targets of energy saving and emission reduction in Shanxi Province, and analyses the aims, significance, design process and implementation of the integration project. Based on that, the paper discusses the challenges and opportunities the project brings. The analysis shows that the project of coal-resource integration in developing countries or regions can effectively improve mining technologies, collect capital and impel international cooperation and exchange. Finally, the paper analyses the concerns about the future, including the possible problems of implementation period, industrial updating, environmental impact and re-employment. However, the successful integration of coal resources can mitigate energy crisis and climate crisis and promote cleaner production effectively. - Highlights: → Coal-resource integration gives a new idea or an approach to energy saving and emission reduction. → Coal-resource integration mitigates climate crisis and promotes cleaner production. → Coal-resource integration brings challenges and opportunities to traditional mining industries.

  1. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Portugal

    1977-10-01

    Portugal is situated on the western edge of the Iberian Meseta. At present, its reasonably assured reserves are about 7800 t of U (including 1000 t of U at more than 830/lb U 3 O 8 ) and 850 t of U in estimated additional reserves. This potential is divided between vein deposits and deposits located in the peribatholithic schists or enclaved in granite. Two main districts share these reserves - Beira at the centre of the country and Alto Alentejo in the east, approximately at the same latitude as Lisbon. In spite of the considerable prospecting activities authorized by Portugal in the Meseta area, the subject cannot yet be regarded as exhausted. Additional resources may still be located in the horizontal and vertical extensions of the vein mineralizations or schists from the already known deposits or outside the districts containing such deposits. Moreover, certain post-Palaeozoic sedimentary basins exhibit features favourable for the presence of uranium-bearing deposits and therefore deserve to be taken into consideration. However, there are as yet no examples of economic mineralization in such locations in Portugal. All things considered, we considered it reasonable to place Portugal in category No. 3 of the classiffication adopted by BJREP. (author)

  2. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Indonesia

    1977-10-01

    Indonesia is a country of south east Asia comprising a large island group extending east-west for over 3000 miles. The geology of Indonesia is fairly well known but is extremely complicated. Successive mountain movements took place around an ancient crustal area. The oldest, of Permian-Triassic age formed northeast Sumatra, northern Java and western Kalimantan. This was followed by the Sumatra orogenesis and finally in Cretaceous and Tertiary times the southern half of Java and the islands as far as New Guinea were formed. Geological studies tend to indicate that the most favourable uranium areas are likely to be in West Sumatra and West Kalimantan. Exploration by the Directorate of Survey and Geology of the National Atomic Energy Agency has been carried out on a small scale since 1961. Exploration concession have been granted to French, German and Japanese organisations. No uranium reserve or resource figures have ever been stated but small occurrences and radioactive anomalies have been found in West and South Sumatra, West and Central Kalimantan and in West Irian. Although the geology of some areas appears to be favourable, little success has attended exploration efforts to date and thus the Speculative Potential is noted as between 1,000 and 10,000 tonnes uranium. (author)

  3. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Turkey

    1977-08-01

    Turkey has an area of 296 185 sq mi or 767 120 square kilometers. The geology is dominated lay Tertiary and post-Tertiary rocks which are very widespread but extensive outcrops of Mesozoic rocks also occur. Paleozoic rocks, mainly gneisses, mica schists and quartzites occur in the ancient massifs, principally the Istranca massif in Thrace, the Merideres massif in western Anatolia and the Karrshir massif in central Anatolia. Prospecting for uranium began in Turkey in 1953 and the Atomic Energy Raw Materials Division of the Maden Tetkikive Arama Enstitusu (M.T.A.) was founded in 1956. By 1962 a total of 78% of the whole country had been covered by serial radiometric reconnaissance prospecting. Uranium was discovered at Kasar in western Anatolia in 1961 and several hundred tons of reserves estimated two years later. Uranium prospecting was largely recessed from 1963 to 1967. IAEA/UNDP assistance was provided in 1962-63 and 1965 and between 1974 and 1977 in a detailed exploration programme in the Kasar area. In the whole country nearly 600 anomalies and occurrences had been identified by 1963. Several occurrences principally in Western Anatolia had been assigned a small reserve. A recent official estimate places the total national reserve at 3150 tonnes uranium in the less than 30% category of reasonably assured resources. A speculative Potential of between 30,000 and 50,000 tonnes uranium is considered to be reasonable. (author)

  4. Advanced Water Purification System for In Situ Resource Utilization Project

    Anthony, Stephen M.

    2014-01-01

    A main goal in the field of In Situ Resource Utilization is to develop technologies that produce oxygen from regolith to provide consumables to an extratrrestrial outpost. The processes developed reduce metal oxides in the regolith to produce water, which is then electrolyzed to produce oxygen. Hydrochloric and hydrofluoric acids are byproducts of the reduction processes, which must be removed to meet electrolysis purity standards. We previously characterized Nation, a highly water selective polymeric proton-exchange membrane, as a filtrtion material to recover pure water from the contaminated solution. While the membranes successfully removed both acid contaminants, the removal efficiency of and water flow rate through the membranes were not sufficient to produce large volumes of electrolysis-grade water. In the present study, we investigated electrodialysis as a potential acid removable technique. Our studies have show a rapid and significant reduction in chloride and fluoride concentrations in the feed solution, while generating a relatively small volume of concentrated waste water. Electrodialysis has shown significant promise as the primary separation technique in ISRU water purification processes.

  5. SERI Solar Radiation Resource Assessment Project: Fiscal Year 1990 Annual Progress Report

    Riordan, C; Maxwell, E; Stoffel, T; Rymes, M; Wilcox, S

    1991-07-01

    The purpose of the Solar Radiation Resource Project is to help meet the needs of the public, government, industry, and utilities for solar radiation data, models, and assessments as required to develop, design, deploy, and operate solar energy conversion systems. The project scientists produce information on the spatial (geographic), temporal (hourly, daily, and seasonal), and spectral (wavelength distribution) variability of solar radiation at different locations in the United States. Resources committed to the project in FY 1990 supported about four staff members, including part-time administrative support. With these resources, the staff must concentrate on solar radiation resource assessment in the United States; funds do not allow for significant efforts to respond to a common need for improved worldwide data. 34 refs., 21 figs., 6 tabs.

  6. Image applications for coastal resource planning: Elkhorn Slough Pilot Project

    Kvitek, Rikk G.; Sharp, Gary D.; VanCoops, Jonathan; Fitzgerald, Michael

    1995-01-01

    The purpose of this project has been to evaluate the utility of digital spectral imagery at two levels of resolution for large scale, accurate, auto-classification of land cover along the Central California Coast. Although remote sensing technology offers obvious advantages over on-the-ground mapping, there are substantial trade-offs that must be made between resolving power and costs. Higher resolution images can theoretically be used to identify smaller habitat patches, but they usually require more scenes to cover a given area and processing these images is computationally intense requiring much more computer time and memory. Lower resolution images can cover much larger areas, are less costly to store, process, and manipulate, but due to their larger pixel size can lack the resolving power of the denser images. This lack of resolving power can be critical in regions such as the Central California Coast where important habitat change often occurs on a scale of 10 meters. Our approach has been to compare vegetation and habitat classification results from two aircraft-based spectral scenes covering the same study area but at different levels of resolution with a previously produced ground-truthed land cover base map of the area. Both of the spectral images used for this project were of significantly higher resolution than the satellite-based LandSat scenes used in the C-CAP program. The lower reaches of the Elkhorn Slough watershed was chosen as an ideal study site because it encompasses a suite of important vegetation types and habitat loss processes characteristic of the central coast region. Dramatic habitat alterations have and are occurring within the Elkhorn Slough drainage area, including erosion and sedimentation, land use conversion, wetland loss, and incremental loss due to development and encroachnnent by agriculture. Additonally, much attention has already been focused on the Elkhorn Slough due to its status as a National Marine Education and Research

  7. International Uranium Resources Evaluation Project (IUREP) national favourability studies: France

    1977-09-01

    France, with an area of 550,000 km 2 , has been prospecting its territory for uranium for more than 30 years. The proven uranium reserves in all the ore categories defined by the NEA/lAEA are estimated at around 120,000 tU, of which 25,000 tU have already been mined. About 70% of these reserves are associated with granites, while the bulk of the remainder is located in Permian sediments and the last in Paleogene sediments. The prospecting effort has not been distributed equally over French territory. More than half of it - recent orogens and large basins - have been little or very little prospected. On the other hand, the Hercynian massifs and their Upper Paleozoic mantle have been systematically prospected. Nevertheless, even within the latter there is still room for further exploration: extensions of already known mineralizations both laterally and vertically, conventional mineralizations deep down or under a mantle, types of mineralizations not investigated previously (those associated with acid or intermediate vulcanism, peribatholithic shales, alkaline complexes etc.). Of course, in the areas that have not been so well explored, because they appear less favourable, there are still some possibilities, namely, in the areas of recent orogens, mineralizations associated with antemesozoic cores (same types as above) or directly associated with orogenesis (slightly to moderately metamorphic sandstone-phyllitic formations, certain sedimentary formations etc.). As for the large basins, they are capable of containing mineralizations associated with some of their formations (Paleogene of the Basin of Aquitaine etc), but they may also cover workable uranium deposits. It is possible that, in the not to distant future access may be gained to such ores in particular cases. On this basis it does not seem unreasonable to reckon with the discovering of new resources of an order of magnitude between half and the same as those already found. (author)

  8. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Sweden

    1977-11-01

    Sweden, covers an area of approx. 450 000 square kilometers. It has a population of 8 millions. With few exceptions in the northern part the access can be regarded as good. A dense network of motorroads and railroad exists. The results obtained by the exploration works combined with other available geo-information permit a separation of two principal uranium provinces in Sweden. The first one is confined to sediments of Upper Cambrian and Lower Ordovician which appears in Southern Sweden and along the border of the Caledonian mountain range in Central Sweden. The uranium occurrence are stratiform, of blackshale type which occurs in the Peltura zone of Upper Cambrian or they are associated to a phosphatite-bearing unit of Lower Ordovician overlying the Cambrian shale formation. The distribution of uranium in Upper Cambrian rocks is in general dependant on their lithology which itself is related to the paleography. This conditions explain relatively higher uranium content of the shale from Billigen.The potential resources of the province are estimated at about 1 million tonnes uranium. The second uranium province, called Arjeplog-Arvidsjaur, situated immediately south of the Arctic circle, comprises one deposit - Pleutajokk - and a group of more than twenty occurrences of similar characteristics and age (1 700 - 1 800 my.). The results of the past exploration have shown that uranium is present in different types of rocks. Because of the presence of uranium in many of the pegmatites the possibility of the formation of large low grade deposits should be tested. Favourable areas are those regions where the geological conditions are similar to the geology of the Grenville province in Canada or the Damara belt of SW-Africa. Special studies are recommended on this subject

  9. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Bolivia

    1977-08-01

    Bolivia has an area of 1,098,580 square kilometers. Its capital is La Paz. The western part of the country is dominated by two ranges of the Andes Mountains, the Cordillera Occidental on the vest flank of the high plateau (Altiplano) and the Cordillera Real (or Oriental) on the east flank. The northern Andes average 5,486 meters in elevation; the southern Andes are not as lofty. The Altiplano is 3,658 to A,267 meters high and 129 km. in average width; it is the largest basin of inland drainage in South America and contains the renowned Lake Titicaca on the Peruvian-Bolivian border. The eastern tropical lowlands or pampas (Oriente) comprise about two-thirds of the country, with rain forest in the northern portion. An intermediate zone of valleys and basins lies between the eastern Andes and Oriente. Bolivia differs from other Andean countries, like Chile, Peru and Ecuador, in having large areas of Preeambrian schists, gneisses, migmatites and granites. These crop out in the eastern part of the country. Parts of these rocks contain banded iron formations (i.e., in the Muttin region) and are probably early Precambrian in age. Little systematic exploration for uranium was undertaken in Bolivia until the late 1960's. In 1967, 1968 and 1969 technical assistance was requested from, and provided by, the IAEA. This work led to evaluation of radioactive anomalies in veins of northeast Bolivia and in sandstones in the extreme southern part of the country. Although no uranium reserves are now credited to Bolivia, the geologic possibilities for several kinds of uranium deposits coupled with the relatively limited work done to date suggest that uranium orebodies will be discovered. It is estimated that the potential resources of Bolivia are in the range of 10,000 to 100,000 tonnes uranium

  10. National Wetlands Inventory Points

    Minnesota Department of Natural Resources — Wetland point features (typically wetlands that are too small to be as area features at the data scale) mapped as part of the National Wetlands Inventory (NWI). The...

  11. Public Waters Inventory Maps

    Minnesota Department of Natural Resources — This theme is a scanned and rectified version of the Minnesota DNR - Division of Waters "Public Waters Inventory" (PWI) maps. DNR Waters utilizes a small scale...

  12. Shuffled Frog Leaping Algorithm for Preemptive Project Scheduling Problems with Resource Vacations Based on Patterson Set

    Yi Han

    2013-01-01

    Full Text Available This paper presents a shuffled frog leaping algorithm (SFLA for the single-mode resource-constrained project scheduling problem where activities can be divided into equant units and interrupted during processing. Each activity consumes 0–3 types of resources which are renewable and temporarily not available due to resource vacations in each period. The presence of scarce resources and precedence relations between activities makes project scheduling a difficult and important task in project management. A recent popular metaheuristic shuffled frog leaping algorithm, which is enlightened by the predatory habit of frog group in a small pond, is adopted to investigate the project makespan improvement on Patterson benchmark sets which is composed of different small and medium size projects. Computational results demonstrate the effectiveness and efficiency of SFLA in reducing project makespan and minimizing activity splitting number within an average CPU runtime, 0.521 second. This paper exposes all the scheduling sequences for each project and shows that of the 23 best known solutions have been improved.

  13. Ion exchange separation of plutonium and gallium (1) resource and inventory requirements, (2) waste, emissions, and effluent, and (3) facility size

    DeMuth, S.

    1997-01-01

    The following report summarizes an effort intended to estimate within an order-of-magnitude the (1) resource and inventory requirements, (2) waste, emissions, and effluent amounts, and (3) facility size, for ion exchange (IX) separation of plutonium and gallium. This analysis is based upon processing 3.5 MT-Pu/yr. The technical basis for this summary is detailed in a separate document, open-quotes Preconceptual Design for Separation of Plutonium and Gallium by Ion Exchangeclose quotes. The material balances of this separate document are based strictly on stoichiometric amounts rather than details of actual operating experience, in order to avoid classification as Unclassified Controlled Nuclear Information. This approximation neglets the thermodynamics and kinetics which can significantly impact the amount of reagents required. Consequently, the material resource requirements and waste amounts presented here would normally be considered minimums for processing 3.5 MT-Pu/yr; however, the author has compared the inventory estimates presented with that of an actual operating facility and found them similar. Additionally, the facility floor space presented here is based upon actual plutonium processing systems and can be considered a nominal estimate

  14. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Bangladesh

    1978-01-01

    With the exception of the exploration activities in relation with the Beach Sand Project along the eastern Bay of Bengal, no systematic exploration for uranium had been done before December 1976, when a radiometric survey was implemented by the IAEA. As a result of this survey high radioactivity up to 450 cps was detected in placer Tipam deposits, The background of the terrain made up by Tertiary sediments is 160 - 170 cps. An anomaly was found in Kalipur Chara area which coincides with concentration of heavy minerals derived from Tipam Sandstones. Another anomaly was found within a horizon of Tipam sandstone crossing Hari River. An isolated outcrop in the riverbed showed a count rate up to 4 times background. During the follow up work it was found that this steeply dipping mineralized band stretches (with interruptions) over a distance of at least 3km along a strike. Samples collected from three different spils showed concentration of uranium 50, 60 and 140 ppm. The mineralized bed varies in thickness from a few cm to 2 m. It consists of alternating altered and unaltered sandstone. Bangladesh and Australian experts have separated monazite, zircon, ilmenite, rutile and magnetite from local sands at Cox's Bazar, 96 km southeast of Dacca. Radioactive mineral content is around 3,1% and exploitation may be feasible. Concerning the present status of exploration the technical assistance mission of the IAEA in the field of uranium exploration in Bangladesh is continuing with the objective to evaluate uranium potential in Chittongong and Sylhet district. Concerning areas favourable for uranium first priority should be given to areas of Hari River and Kalipur Chara where radioactive anomalies were detected. In general the area covered by Tipam Sandstone appears to be favourable for uranium mineralization. The potential for new discoveries in Bangladesh appears to be not too bad. Speculative potential could be in the order of 1-10,000 tons uranium

  15. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Panama

    1977-08-01

    About 20 percent of Panama has been covered by airborne radiometric surveys, largely in the Azuero-Petaquilia area. Essentially no ground examinations have been made. About one third of the country remains unmapped. Most of the rest has been examined only in rapid reconnaissance largely by the United Nations and oil companies. Detailed mapping has been confined to the Canal Zone. No uranium deposits or prospects of economic interest are known in Panama. There appears to be no information available on present exploration activities for uranium. Panama has no specific legislation relating to nuclear energy. However, all mineral deposits belong to the state, except for salt and similar materials, and are governed by the mineral resources code. There appears to be only one remote possibility for uranium mineralization in Panama, namely, sandstone-type deposits. Marginal marine and fluvial sediments, such as host sandstone-type deposits elsewhere, are most abundant 1n the lower Cenozoic parts of the Azuero and possibly Bocas del Toro basins and are probably absent or poorly developed in the Darien and Central basin. Rocks with even moderate background uranium concentrations to be leached and deposited in such sediments are confined to the silicic and alkaline Intrusive rocks of the La Yeguada Formation 1n western Panama and possibly the Rio Guayabo stock in the Sierra de Maje of eastern Panama. Only the La Yeguada Formation is extensive enough and near enough to a potential sedimentary ore host to be important. Uranium concentrations have not been measured in this unit but its silicic composition, relatively young age (with respect to other volcanic rocks in Panama) and high ash content suggest that it may have relatively high Teachable uranium content. The best areas for exploration for La Yeguada-derived sandstone-type uranium deposits would be in the Pese formation between Santiago and Chitre in the Azuero basin. Possibly favourable sandstone type exploration ground

  16. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Mexico

    1977-07-01

    Reserves of uranium are located in the north eastern part of Mexico, primarily in the states of Tamaulipas and Chihuahua. Most of the remainder of Mexico's reserves are near the Tamaulipas-Neuvo Leon state border in the Tertiary Frio Formation, where they apparently occur in the types of uranium deposits found in Texas, U.S.A. There are two deposits, La Coma and Buenavista, but nothing has been published on dimensions of the ore bodies. Forty-five miles northeast of Hermosillo, in Sonora state is the Los Amoles district where uranium is found associated with gold and other metals in low-grade deposits on the margins of a Cretaceous batholith. Another occurrence is reported in the mining district of Placer de Guadelupe and Puerto del Aire, about 40-50 km northeast of Chihuahua City, in the state of Chihuahua. Reserves of U 3 O 8 which were published in January 1977 by Nuclear Exchange Corporation of Menlo Park, California, are listed. The government of Mexico has not estimated potential resources. It should be noted that much of Mexico appears favourable for uranium, and only 10 percent has been explored. According to NUEXCO (1977), efforts to find uranium are being increased in an attempt to supply Mexico's nuclear reactor requirements through 1990. Activity is reported to be centered in Tamaulipas and Chihuahua states and to a lesser extent in Nueva Leon, Sonora, Coahuila, and Baja California. Major effort will continue to be placed in Chihuahua state to supply the Penna Bianca mill. Correspondence between favorable geological settings for uranium and the geologic regions of Mexico is reported. Mexico is a country with considerable areas that appear promising for discovery of sandstone, vein, and tuff-related deposits. On the other hand, its potential for Precambrian conglomerate and unconformity-related deposits is limited. Considering these geologic factors, as well as the relatively limited amount of exploration done to date, a guesstimate of speculative

  17. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Argentina

    1977-08-01

    intruded by acidic rocks. The High Cordiilera, an area of 200,000 square kilometers in northwestern Argentina contains sedimentary, metamorphic, and igneous rocks that could be favorable although the difficult topography is a restrictive influence. The distribution of uranium mineralization in various sediments and other rock types over large areas of Argentina is suggestive of widespread favorability for uranium-ore formation. Inasmuch as uranium reserves plus potential are already estimated at close to 80,000 tons U 3 O 8 , and exploration has not been exhaustively conducted, ultimate resource potential might realistically be expected to fall in the 100,000 to 500,000 ton U 3 O 8 range

  18. Projected Growth in Small-Scale, Fossil-Fueled Distributed Generation: Potential Implications for the U.S. Greenhouse Gas Inventory

    Eberle, Annika [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Heath, Garvin A [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-29

    The generation capacity of small-scale (less than one megawatt) fossil-fueled electricity in the United States is anticipated to grow by threefold to twenty-fold from 2015 to 2040. However, in adherence with internationally agreed upon carbon accounting methods, the Environmental Protection Agency's (EPA's) U.S. Greenhouse Inventory (GHGI) does not currently attribute greenhouse gases (GHGs) from these small-scale distributed generation sources to the electric power sector and instead accounts for these emissions in the sector that uses the distributed generation (e.g., the commercial sector). In addition, no other federal electric-sector GHG emission data product produced by the EPA or the U.S. Energy Information Administration (EIA) can attribute these emissions to electricity. We reviewed the technical documentation for eight federal electric-sector GHG emission data products, interviewed the data product owners, collected their GHG emission estimates, and analyzed projections for growth in fossil-fueled distributed generation. We show that, by 2040, these small-scale generators could account for at least about 1%- 5% of total CO2 emissions from the U.S. electric power sector. If these emissions fall outside the electric power sector, the United States may not be able to completely and accurately track changes in electricity-related CO2 emissions, which could impact how the country sets GHG reduction targets and allocates mitigation resources. Because small-scale, fossil-fueled distributed generation is expected to grow in other countries as well, the results of this work also have implications for global carbon accounting.

  19. A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

    Yongyi Shou

    2014-01-01

    Full Text Available A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent’s energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resource-constrained project portfolio selection and scheduling problem.

  20. The promise of common pool resource theory and the reality of commons projects

    Fred P. Saunders

    2014-08-01

    Full Text Available Commons projects, such as community-based natural resource management, have widespread appeal, which has enabled them to shrug off a mixed performance in practice. This paper discusses how the theoretical assumptions of common pool resource (CPR theory may have inadvertently contributed to the unfulfilled expectations of commons projects. The paper argues that the individual ‘rational resource user’, encapsulated in the CPR design principles, struggles to provide clear direction for meaningful consideration of local norms, values and interests in commons projects. The focus of CPR theory on efficiency and functionality results in a tendency in commons projects to overlook how local conditions are forged through relations at multiple scales. Commonly politically complex and changing relations are reduced to institutional design problems based on deriving the incentives and disincentives of ‘rational resource users. The corollary is that CPR theory oversimplifies the project context that it is seeking to change because it offers little or no direction to deal with the social embeddedness of resource use or implications of different stratifications.

  1. Optimizing strategy software for repetitive construction projects within multi-mode resources

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of contractor’s view such as: proposed project duration with corresponding gross value and cash flows. This paper focuses on how to calculate tender data using Optimizing Strategy Software (OSS for repetitive construction projects with identical activity’s duration in case of single number of crew such as: project duration, project/bid price, project maximum working capital, and project net present value of the studied project. A simplified multi-objective optimization software (OSS will be presented that creates best tender data to contractor compared with more feasible options generated from multi-mode resources in a given project. OSS is intended to give more scenarios which provide practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price, and project maximum working capital while maximizing its net present value simultaneously. OSS is designed by java programing code system to provide a number of new and unique capabilities, including: (1 Ranking the obtained optimal plans according to a set of planner specified weights representing the relative importance of duration, price, maximum working capital and net present value in the analyzed project; (2 Visualizing and viewing the generated optimal trade-off; and (3 Providing seamless integration with available project management calculations. In order to provide the aforementioned capabilities of OSS, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; (4 A connecting module. At the end of the paper, an illustrative example will be presented to demonstrate and verify the applications of the proposed software (OSS to an optimization expressway of repetitive construction project.

  2. Hawaii energy strategy project 3: Renewable energy resource assessment and development program

    NONE

    1995-11-01

    RLA Consulting (RLA) has been retained by the State of Hawaii Department of Business, Economic Development and Tourism (DBEDT) to conduct a Renewable Energy Resource Assessment and Development Program. This three-phase program is part of the Hawaii Energy Strategy (HES), which is a multi-faceted program intended to produce an integrated energy strategy for the State of Hawaii. The purpose of Phase 1 of the project, Development of a Renewable Energy Resource Assessment Plan, is to better define the most promising potential renewable energy projects and to establish the most suitable locations for project development in the state. In order to accomplish this goal, RLA has identified constraints and requirements for renewable energy projects from six different renewable energy resources: wind, solar, biomass, hydro, wave, and ocean thermal. These criteria were applied to areas with sufficient resource for commercial development and the results of Phase 1 are lists of projects with the most promising development potential for each of the technologies under consideration. Consideration of geothermal energy was added to this investigation under a separate contract with DBEDT. In addition to the project lists, a monitoring plan was developed with recommended locations and a data collection methodology for obtaining additional wind and solar data. This report summarizes the results of Phase 1. 11 figs., 22 tabs.

  3. Introducing a New Concept Inventory on Climate Change to Support Undergraduate Instruction, Teacher Education, Education Research, and Project Evaluation (Invited)

    Morrow, C. A.; Monsaas, J.; Katzenberger, J.; Afolabi, C. Y.

    2013-12-01

    The Concept Inventory on Climate Change (CICC) is a new research-based, multiple-choice 'test' that provides a powerful new assessment tool for undergraduate instructors, teacher educators, education researchers, and project evaluators. This presentation will describe the features and the development process of the (CICC). This includes insights about how the development team (co-authors) integrated and augmented their multi-disciplinary expertise. The CICC has been developed in the context of a popular introductory undergraduate weather and climate course at a southeastern research university (N~400-500 per semester). The CICC is not a test for a grade, but is intended to be a useful measure of how well a given teaching and learning experience has succeeded in improving understanding about climate change and related climate concepts. The science content addressed by the CICC is rooted in the national consensus document, 'Climate Literacy: The Essential Principles of Climate Science'. The CICC has been designed to support undergraduate instruction, and may be valuable in comparable contexts that teach about climate change. CICC results can help to inform decisions about the effectiveness of teaching strategies by 1) flagging conceptual issues (PRE-instruction); and 2) detecting conceptual change (POST-instruction). Specific CICC items and their answer choices are informed by the research literature on common misunderstandings about climate and climate change. Each CICC item is rated on a 3-tier scale of the cognitive sophistication the item is calling for, and there is a balance among all three tiers across the full instrument. The CICC development process has involved data-driven changes to successive versions. Data sources have included item statistics from the administration of progressively evolved versions of the CICC in the weather and climate course, group interviews with students, and expert review by climate scientists, educators, and project evaluators

  4. The 2004 activities and the workshop of the human resources development project in FNCA. Contract research

    NONE

    2005-08-01

    In 1999, the Project for Human Resources Development (HRD Project) was initiated as defined in the framework of the Forum for Nuclear Cooperation in Asia (FNCA), organized by the Atomic Energy Commission of Japan. The objective of the HRD Project is to solidify the foundation of technologies for nuclear development and utilization in Asia by promoting human resources development in Asian countries. In the Project there are two kinds of activity; in-workshop activity and Outside-of-workshop activity. The FNCA 2004 Workshop on HRD Project was held on October 4-7, 2004, in Kuala Lumpur, Malaysia. The Workshop was sponsored by the Ministry of Science and Technology Innovation (MOSTI) of Malaysia and the Ministry of Education, Culture, Sports, Science and Technology (MEXT) of Japan. The Malaysian Institute for Nuclear Technology Research (MINT) and the Japan Atomic Energy Research Institute (JAERI) acted as the hosts. Participating countries were China, Indonesia, Republic of Korea, Japan, Malaysia, the Philippines, Thailand, and Vietnam. The activities of HRD Project was presented in the Sixth Coordinators Meeting of FNCA was held on March 30 - April 1, 2005, in Tokyo, Japan. This report consists of presentation papers and materials at the FNCA 2004 Workshop, a review document of HRD Project for the Coordinators Meeting of FNCA, a letter of request from the Project Leader of Japan to the Project Leaders of the participating countries and theme of the country report as Outside-Workshop Activity. (author)

  5. Hydroelectric resources. Inventory of the hydroelectric resources of the Atlantic Coast; Recursos hidroelectricos. Inventario de los recursos hidroelectricos de la Costa Atlantica

    Arrieta, R M; Insignares R, G

    1987-07-01

    Basically this report gives a clear vision of the possibilities of energy development in the Colombian Atlantic Coast, projects that contemplate a wide range as soon as it refers that is to say to generation ranges, they have been identified at level macro in the Sierra Nevada region and the Peasant with a profitable hydroelectric potential of 631 MW; in the Sinu region, 3 projects were identified with a profitable potential of 1186 MW and in the Magdalena region, was also identified 3 projects whose profitable potential is of 475 MW. At level micro, the carried out studies defined in the same previous regions a series of projects that they necessarily reach the megawatt. The report contains a description of each one of the identified projects and its current situation. It also presents a review of the makers of turbines that exist at the moment in the country.

  6. Models of Financing and Available Financial Resources for Transport Infrastructure Projects

    O. Pokorná

    2001-01-01

    Full Text Available A typical feature of transport infrastructure projects is that they are expensive and take a long time to construct. Transport infrastructure financing has traditionally lain in the public domain. A tightening of many countries' budgets in recent times has led to an exploration of alternative resources for financing transport infrastructures. A variety of models and methods can be used in transport infrastructure project financing. The selection of the appropriate model should be done taking into account not only financial resources but also the distribution of construction and operating risks and the contractual relations between the stakeholders.

  7. NCRN Hemlock Inventory Data

    Department of the Interior — ​Data associated with the 2015 hemlock inventory project in NCR. Eastern hemlock (Tsuga canadensis) is a coniferous tree native to the NE and Appalachian regions of...

  8. The Integrated Data Base program: An executive-level data base of spent fuel and radioactive waste inventories, projections, and characteristics

    Klein, J.A.

    1987-01-01

    The Integrated Data Base (IDB) is the official US Department of Energy (DOE) data base for spent fuel and radioactive waste inventories and projections. As such, it should be as convenient to utilize as is practical. Examples of summary-level tables and figures are presented, as well as more-detailed graphics describing waste-form distribution by site and line charts illustrating historical and projected volume (or mass) changes. This information is readily accessible through the annual IDB publication. Other presentation formats are also available to the DOE community through a simple request to the IDB Program

  9. A comprehensive inventory of radiological and nonradiological contaminants in waste buried or projected to be buried in the subsurface disposal area of the INEL RWMC during the years 1984-2003, Volume 2

    1995-05-01

    This is the second volume of this comprehensive report of the inventory of radiological and nonradiological contaminants in waste buried or projected to be buried in the subsurface disposal area of the Idaho National Engineering Laboratory. Appendix B contains a complete printout of contaminant inventory and other information from the CIDRA Database and is presented in volumes 2 and 3 of the report

  10. Human resource management in the project-oriented organization: Employee well-being and ethical treatment

    Turner, R.; Huemann, M.; Keegan, A.

    2008-01-01

    As part of a wider study into human resource management (HRM) practices in project-oriented organizations, we investigated the issue of employee well-being. Project-oriented organizations adopt temporary work processes to deliver products and services to clients. This creates a dynamic work environment, where additional pressures can be imposed on the employee from fluctuating work-loads, uncertain requirements, and multiple role demands. These pressures can create issues for employee well-be...

  11. A study of the Bienstock-Zuckerberg algorithm, Applications in Mining and Resource Constrained Project Scheduling

    Muñoz, Gonzalo; Espinoza, Daniel; Goycoolea, Marcos; Moreno, Eduardo; Queyranne, Maurice; Rivera, Orlando

    2016-01-01

    We study a Lagrangian decomposition algorithm recently proposed by Dan Bienstock and Mark Zuckerberg for solving the LP relaxation of a class of open pit mine project scheduling problems. In this study we show that the Bienstock-Zuckerberg (BZ) algorithm can be used to solve LP relaxations corresponding to a much broader class of scheduling problems, including the well-known Resource Constrained Project Scheduling Problem (RCPSP), and multi-modal variants of the RCPSP that consider batch proc...

  12. The Lifestyle Project: Challenging Students to Redefine their Approach to Resource Use (Invited)

    Kirk, K.

    2009-12-01

    The Lifestyle Project is a way for students to learn about environmental impacts by changing their own lifestyles. It is a three-week exercise during which students reduce their energy use, waste output and water use by changing the way they live from day to day. The project has fairly rigid parameters, allowing students to achieve a gradual but definitive change in their everyday habits. Students begin by taking baseline measurements of their resource use, and then they select three different areas in which they are interested in reducing their environmental impact. Within each area there are clearly defined rules that provide a structured means for achieving significant changes. Each week the project becomes more rigorous, because students will have to meet the requirements more frequently. They write about their experiences in journals, which are incredibly insightful and illustrate just how profoundly the project affects them. The Lifestyle Project has been used across several campuses and in many educational settings such as traditional courses, online courses and in informal settings. Its strength lies in allowing students to quantify and modify their own use of resources, then compare their personal reductions to what could be applied in a larger population. This helps them apply and personalize many of the concepts addressed in courses about environmental geology, climate change, or energy resources. The incremental nature of the project allows students several opportunities to practice new behaviors, so that they become adept at using far fewer resources than they thought would be possible. Results from the Lifestyle Project indicate that students save significant amounts of energy, on the order of 1 to 2 million BTUs per day. Journal reflections illustrate a corresponding shift in students’ personal awareness of their use of resources and the repercussions of their daily decisions. Although many students find the project frustrating at first, after

  13. Statistical strategy for inventorying and monitoring the ecosystem resources of the Mexican States of Jalisco and Colima at multiple scales and resolution levels

    H. T. Schreuder; M. S. Williams; C. Aguirre-Bravo; P. L. Patterson

    2003-01-01

    The sampling strategy is presented for the initial phase of the natural resources pilot project in the Mexican States of Jalisco and Colima. The sampling design used is ground-based cluster sampling with poststratification based on Landsat Thematic Mapper imagery. The data collected will serve as a basis for additional data collection, mapping, and spatial modeling...

  14. A Cultural Resources Inventory and Historical Evaluation of the Smoky Atmospheric Nuclear Test, Areas 8, 9, and 10, Nevada National Security Site, Nye County, Nevada

    Jones, Robert C. [Desert Research Inst. (DRI), Reno, NV (United States); King, Maureen L. [Desert Research Inst. (DRI), Reno, NV (United States); Beck, Colleen M. [Desert Research Inst. (DRI), Reno, NV (United States); Falvey, Lauren W. [Desert Research Inst. (DRI), Reno, NV (United States); Menocal, Tatianna M. [Desert Research Inst. (DRI), Reno, NV (United States)

    2014-09-01

    This report presents the results of a National Historic Preservation Act Section 106 cultural resources inventory and historical evaluation of the 1957 Smoky atmospheric test location on the Nevada National Security Site (NNSS). The Desert Research Institute (DRI) was tasked to conduct a cultural resources study of the Smoky test area as a result of a proposed undertaking by the Department of Energy Environmental Management. This undertaking involves investigating Corrective Action Unit (CAU) 550 for potential contaminants of concern as delineated in a Corrective Action Investigation Plan. CAU 550 is an area that spatially overlaps portions of the Smoky test location. Smoky, T-2c, was a 44 kt atmospheric nuclear test detonated at 5:30 am on August 31, 1957, on top of a 213.4 m (700 ft) 200 ton tower (T-2c) in Area 8 of the NNSS. Smoky was a weapons related test of the Plumbbob series (number 19) and part of the Department of Defense Exercise Desert Rock VII and VIII. The cultural resources effort involved the development of a historic context based on archival documents and engineering records, the inventory of the cultural resources in the Smoky test area and an associated military trench location in Areas 9 and 10, and an evaluation of the National Register eligibility of the cultural resources. The inventory of the Smoky test area resulted in the identification of structures, features, and artifacts related to the physical development of the test location and the post-test remains. The Smoky test area was designated historic district D104 and coincides with a historic archaeological site recorded as 26NY14794 and the military trenches designed for troop observation, site 26NY14795. Sites 26NY14794 and 26NY14795 are spatially discrete with the trenches located 4.3 km (2.7 mi) southeast of the Smoky ground zero. As a result, historic district D104 is discontiguous and in total it covers 151.4 hectares (374 acres). The Smoky test location, recorded as historic

  15. The 2002 activities and the 4th workshop of the human resources development project in FNCA

    2003-07-01

    In 1999, the Project for Human Resources Development (HRD Project) was initiated as defined in the framework of the Forum for Nuclear Cooperation in Asia (FNCA), organized by the Atomic Energy Commission of Japan. The objective of the HRD Project is to solidify the foundation of technologies for nuclear development and utilization in Asia by promoting human resources development in Asian countries. In the Project there are two kinds of activity; In-workshop activity and Outside-of-workshop activity. The 4th Workshop on HRD Project was held on october 8-10, 2002, in Batangas, the Philippines. The Workshop was sponsored by the Department of Science and Technology (DOST) of the Philippines and the Ministry of Education, Culture, Sports, Science and Technology (MEXT) of Japan. The Philippine Nuclear Research Institute (PNRI) and the Japan Atomic Energy Research Institute (JAERI) acted as the hosts. Participating countries were China, Indonesia, Republic of Korea, Japan, Malaysia, the Phillippines, Thailand, and Vietnam. This report consists of presentation papers and materials at the 4th workshop as In-Workshop Activity, a review document of HRD Project for the 5th Coordinators Meeting of FNCA at Tokyo on March, 2003, a letter of proposal from the Project Leader of Japan to the Project Leaders of the participating countries, and training materials of participating countries as Outside-Workshop Activity. (author)

  16. The 2003 activities and the workshop of the human resources development project in FNCA

    2004-07-01

    In 1999, the Project for Human Resources Development (HRD Project) was initiated as defined in the framework of the Forum for Nuclear Cooperation in Asia (FNCA), organized by the Atomic Energy Commission of Japan. The objective of the HRD Project is to solidify the foundation of technologies for nuclear development and utilization in Asia by promoting human resources development in Asian countries. In the Project there are two kinds of activity; In-workshop activity and Outside-of-workshop activity. The FNCA 2003 Workshop on HRD Project was held on October 8-10, 2003, in Bangkok, Thailand. The Workshop was sponsored by the Ministry of Science and Technology (MOST) of Thailand and the Ministry of Education, Culture, Sports, Science and Technology (MEXT) of Japan. Office of Atoms for Peace (OAP) and the Japan Atomic Energy Research Institute (JAERI) acted as the hosts. Participating countries were China, Republic of Korea, Japan, Malaysia, the Philippines, Thailand, and Vietnam. Unfortunately Indonesia could not attend the Workshop this time. This report consists of presentation papers and materials at the FNCA 2003 Workshop as In-Workshop Activity, a review document of HRD Project for the 6th Coordinators Meeting of FNCA at Tokyo on March, 2004, a letter of proposal from the Project Leader of Japan to the Project Leaders of the participating countries, and training materials of participating countries as Outside-Workshop Activity. (author)

  17. Danish-Czech wind resource know-how transfer project. Final report

    Rathmann, O.; Noergaerd, P.; Frandsen, S.

    2004-06-01

    The course of the Danish-Czech Wind Resource Know-how Transfer Project is reported. The know-how transfer component of the project has consisted in performing a wind resource training work-shop for about 13 individuals from the Czech Republic, ranging from scientists to wind farm project developers, and in donating modern software for evaluating wind resources. The project has also included a review of a Czech overview-study of wind speeds inside the country as well as an investigation of the electricity tariffs and their impact on wind energy utilization in the Czech Republic. A problematic existing Czech wind farm project, locked up in a no-production situation, was also addressed. Not until the purchase by a new owner-company, which initiated the necessary repair and maintenance, the wind farm resumed normal operation. As its last task, the present project assisted in consolidating future operation through a helping package consisting of a training course for the wind farm technicians and in a package of relevant spare parts. (au)

  18. Some key techniques of SPOT-5 image processing in new national land and resources investigation project

    Xue, Changsheng; Li, Qingquan; Li, Deren

    2004-02-01

    In 1988, the detail information on land resource was investigated in China. Fourteen years later, it has changed a lot. It is necessary that the second land resource detailed investigation should be implemented. On this condition, the New National Land and Resources Investigation Project in China, which will last 12 years, has been started since 1999. The project is directly under the administration of the Ministry of Land and Resource (MLR). It was organized and implemented By China Geological, China Land Surveying and Planning Institute (CLSPI) and Information Center of MLR. It is a grand and cross century project supported by the Central Finance, based on State and public interests and strategic characteristics. Up to now, "Land Use Dynamic Monitoring By Remote Sensing," "Arable Land Resource Investigation," "Rural Collective Land Property Right Investgiation," "Establishment of Public Consulting Standardization of Cadastral Information," "Land Resource Fundamental Maps and Data Updating," "Urban Land Price Investigation and Intensive Utilization Potential Capacity Evaluation," "Farmland Classification, Gradation, and Evaluation," "Land Use Database Construction at City or County Level" 8 subprojects have had the preliminary achievements. In this project, SPOT-1/2/4 and Landsat-7 TM data were always applied to monitor land use dynamic change as the main data resource. Certainly, IRS, CBERS-2, and IKONOS data also were tested in small areas. In 2002, the SPOT-5 data, whose spatial resolution of the panchromatic image is 2.5 meters and the spectral one is 10 meters, were applied into update the land use base map at the 1:10000 scale in 26 Chinese cities. The purpose in this paper is to communicate the experience of SPOT-5 image processing with the colleagues.

  19. Platinum-group elements in southern Africa: mineral inventory and an assessment of undiscovered mineral resources: Chapter Q in Global mineral resource assessment

    Zientek, Michael L.; Causey, J. Douglas; Parks, Heather L.; Miller, Robert J.

    2014-01-01

    The platinum-group elements, platinum, palladium, rhodium, ruthenium, iridium, and osmium, possess unique physical and chemical characteristics that make them indispensable to modern technology and industry. However, mineral deposits that are the main sources of these elements occur only in three countries in the world, raising concerns about potential disruption in mineral supply. Using information in the public domain, mineral resource and reserve information has been compiled for mafic and ultramafic rocks in South Africa and Zimbabwe that host most of the world’s platinum-group element resources.

  20. Inventory of armourstone

    Le Turdu Valéry

    2016-01-01

    Full Text Available Natural armourstone is widely used for hydraulic works, both in the coastal domain and in border of rivers and torrents, especially to protect against flood and the effects of waves and currents. To meet the expectations associated with this resource, an inventory of armourstone quarries was realized on a national scale in France. This inventory informs not only about the localization of quarries but also about the quality and the availability of materials. To fully optimize this inventory in a dynamic format, the association of all actors of the sector was preferred to archival research. This partnership approach led to project deliverables that can constitute durably a shared reference. The database can indeed be updated regularly thanks to the contacts established with the professionals of quarries. The access to this database is offered to a wide public: maritime and fluvial ports, local authorities in charge of planning and managing structures that protect against flood and other hydraulic hazards. This new database was organized considering its importance on the operational plan. This led to a hierarchical organization at two levels for each quarry face: first level, a synthesis sheet brings the essential information to realize choices upstream to the operational phases. Second level, a detailed specification sheet presents the technical characteristics observed in the past on the considered face. The atlas has two information broadcasting formats: a pdf file with browsing functions and a geographical information system that allows remote request of the database. These two media have their own updating rhythms, annual for the first and continue for the second.

  1. FUNCTIONAL MODEL OF THE MATERIAL RESOURCES MANAGEMENT FOR PROJECTS OF THE CREATION OF NEW TECHNIQUES

    S. Yu. Danshyna

    2016-01-01

    Full Text Available The article is devoted to problem of material management arising in the implementation of projects for the development and creation (modernization of the new techniques. The uniqueness of the projects, their limit on the cost and time does not allow the use of traditional approaches to resource management. Such projects are often implemented in the development of companies; where it is not possible to abandon the traditional operating methods of management. The aim of the article is a formalization of the process of material management of projects, a description of its information flows for integrate into the project management practices and for improve the efficiency of material management. For the systematization of information arising from the material resources management, invited the set-theoretic representation of the management process. According with the requirements of project management standards were described the sets and defined rules of their transformation. Specification of the set-theoretic representation helped to establish the area and limits of the modelling process. Further decomposition process became the basis of the functional model, constructed in accordance with the methodology IDEF 0. A graphical representation of the model allows you to visualize the process at different levels of detail. For specification of issues related to the organization and promotion of material flow, were developed functional models of sub-processes and were described the identified data-flows. For the harmonization of process and project approaches formulated conditions for evaluating the efficiency of material management. The developed models can be the basis for designing the structure of companies, for regulation of their project activities, as well as for establishing an information system of management resources of projects.

  2. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  3. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  4. Public Value Creation Enabled by Healthcare IS Projects – a resource-based-view

    Schlichter, Bjarne Rerup; Svejvig, Per; Laursen, Markus

    Creation of value from IT projects is a recurring theme that has diffused into healthcare information sys-tems (HIS). By applying a resource-based-view on findings from a study on the optimisation project of an integrated health information system (HIS) we develop a framework of capabilities needed...... in a public HIS setting to create value. The framework consists of Professional- , Organisational-, Patient Perceived- and Employee Perceived-Value dimensions. HIS is partly overlooked in the public management literature and the aspect of emergence and (personal as well as organisational) learning plays...... an important role in the creation value in HIS-projects....

  5. A Case Study of Resources Management Planning with Multiple Objectives and Projects

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decisionmaking tools. We have previously described a multiple objective planning...

  6. Resource-constrained project scheduling: computing lower bounds by solving minimum cut problems

    Möhring, R.H.; Nesetril, J.; Schulz, A.S.; Stork, F.; Uetz, Marc Jochen

    1999-01-01

    We present a novel approach to compute Lagrangian lower bounds on the objective function value of a wide class of resource-constrained project scheduling problems. The basis is a polynomial-time algorithm to solve the following scheduling problem: Given a set of activities with start-time dependent

  7. Matching of Resources and the Design of Organizations for Project Management

    Cunningham, S.

    2012-01-01

    This paper addresses a problem common to many high-technology firms. How can firms select and resource appropriate projects while balancing the needs of management as well as technologists? We argue that such problems result in social dilemmas for organizations, requiring practical institutional

  8. 78 FR 79707 - Notice of Public Meeting, Gateway West Project Subcommittee of the Boise District Resource...

    2013-12-31

    ... Resource Advisory Council on matters of planning and management of the Gateway West Project (sections 8 and... Interior, through the BLM, on a variety of planning and management issues associated with public land... a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS...

  9. Inventory of forest and rangeland resources, including forest stress. [Atlanta, Georgia, Black Hills, and Manitou, Colorado test sites

    Heller, R. C.; Aldrich, R. C.; Weber, F. P.; Driscoll, R. S. (Principal Investigator)

    1974-01-01

    The author has identified the following significant results. Some current beetle-killed ponderosa pine can be detected on S190-B photography imaged over the Bear Lodge mountains in the Black Hills National Forest. Detections were made on SL-3 imagery (September 13, 1973) using a zoom lens microscope to view the photography. At this time correlations have not been made to all of the known infestation spots in the Bear Lodge mountains; rather, known infestations have been located on the SL-3 imagery. It was determined that the beetle-killed trees were current kills by stereo viewing of SL-3 imagery on one side and SL-2 on the other. A successful technique was developed for mapping current beetle-killed pine using MSS imagery from mission 247 flown by the C-130 over the Black Hills test site in September 1973. Color enhancement processing on the NASA/JSC, DAS system using three MSS channels produced an excellent quality detection map for current kill pine. More importantly it provides a way to inventory the dead trees by relating PCM counts to actual numbers of dead trees.

  10. Joint-operation in water resources project in Indonesia: Integrated or non-integrated

    Ophiyandri, Taufika; Istijono, Bambang; Hidayat, Benny

    2017-11-01

    The construction of large water resources infrastructure project often involved a joint-operation (JO) project between two or more construction companies. The form of JO can be grouped into two categories - an integrated type and a non-integrated type. This paper investigates the reason of forming a JO project made by companies. The specific advantages and problems of JO project is also analysed in this paper. In order to achieve the objectives, three water resources infrastructure projects were selected as case studies. Data was gathered by conducting 11 semi-structured interviews to project owners, contractor managers, and project staffs. Data was analysed by means of content analysis. It was found that the most fundamental factor to form a JO is to win a competition or tender. An integrated model is in favour because it can reduce overhead costs and has a simple management system, while a non-integrated model is selected because it can avoid a sleeping partner and make contractor more responsible for their own job.

  11. The 2006 activities and the workshop of the human resources development project in FNCA (Contract research)

    2007-09-01

    In 1999, the Project for Human Resources Development (HRD Project) was initiated as defined in the framework of the Forum for Nuclear Cooperation in Asia (FNCA), organized by the Atomic Energy Commission of Japan. The objective of the HRD Project is to solidify the foundation of technologies for nuclear development and utilization in Asia by promoting human resources development in Asia countries. In the Project there are two kinds of activity; In-workshop activity and Outside-workshop activity. The FNCA 2006 Workshop on HRD Project was held on July 31 - August 4, 2006, in Shenzhen, China. The Workshop was sponsored by the China Atomic Energy Authority (CAEA) and the Ministry of Education, Culture, Sports, Science and Technology (MEXT) of Japan. The China Atomic Energy Authority (CAEA) and the Japan Atomic Energy Agency (JAEA) acted as the hosts. Participating countries were China, Indonesia, Republic of Korea, Japan, Malaysia, the Philippines, Thailand, and Vietnam. The activities of HRD Project was presented in the Eighth Coordinators Meeting of FNCA held on February 7th - 9th, 2007, in Tokyo, Japan. This report consists of presentation papers and materials at the FNCA 2006 Workshop, a review document of HRD Project for the Coordinators Meeting of FNCA as Outside-Workshop Activity. (author)

  12. The Navruz Project: Cooperative transboundary monitoring data sharing and modeling of water resources in Central Asia

    Passell, Howard David; Barber, David S.; Solodukhin, V.; Khazekhber, S.; Pozniak, V.; Vasiliev, I.; Alekhina, V.; Djuraev, Akram; Radyuk, R.; Suozzi, D.

    2006-01-01

    The Navruz Project engages scientists from nuclear physics research institutes and water science institutions in the Central Asia Republics of Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan, and Sandia National Laboratories. The project uses standardized methods to monitor basic water quality parameters, radionuclides, and metals in the Syr Darya and Amu Darya rivers. Phase I of the project was initiated in 2000 with 15 sampling points in each of the four countries with sample analysis performed for over 100 parameters. Phase II of the project began in 2003 and expanded sampling to include at least 30 points in each country in an effort to characterize ''hot spots'' and to identify sources. Phase III of the project began in 2006 and will integrate decision support modeling with the existing monitoring. Overall, the project addresses four main goals: to create collaboration among Central Asian scientists and countries; to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and nonproliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources. Contamination of these rivers is a result of growing population, urbanization, and agricultural activities, as well as radioactive contamination from a legacy of uranium mining and related activities of the former Soviet Union. The project focuses on waterborne radionuclides and metals because of the importance of these contaminants to public health and political stability in Central Asia.

  13. The 2005 activities and the workshop of the human resources development project in FNCA (Contract research)

    2006-10-01

    In 1999, the Project for Human Resources Development (HRD Project) was initiated as defined in the framework of the Forum for Nuclear Cooperation in Asia (FNCA), organized by the Atomic Energy Commission of Japan. The objective of the HRD Project is to solidify the foundation of technologies for nuclear development and utilization in Asia by promoting human resources development in Asian countries. In the Project there are two kinds of activity; In-workshop activity and Outside-of-workshop activity. The FNCA 2005 Workshop on HRD Project was held on September 13-16, 2005, in Dalat, Viet Nam. The Workshop was sponsored by the Ministry of Science and Technology (MOST) of Viet Nam and the Ministry of Education, Culture, Sports, Science and Technology (MEXT) of Japan. The Vietnam Atomic Energy Commission (VAEC) and the Japan Atomic Energy Agency (JAEA) acted as the hosts. Participating countries were China, Indonesia, Republic of Korea, Japan, Malaysia, the Philippines, Thailand, and Vietnam. The activities of HRD Project was presented in the Seventh Coordinators Meeting of FNCA was held on March 30 - April 1, 2006, in Tokyo, Japan. This report consists of presentation papers and materials at the FNCA 2005 Workshop, a review document of HRD Project for the Coordinators Meeting of FNCA as Outside-Workshop Activity. (author)

  14. Renewable Resources: a national catalog of model projects. Volume 1. Northeast Solar Energy Center Region

    None

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Northeast Solar Energy Center Region. (WHK).

  15. Harmonization and development of resources and tools for Italian natural language processing within the PARLI project

    Bosco, Cristina; Delmonte, Rodolfo; Moschitti, Alessandro; Simi, Maria

    2015-01-01

    The papers collected in this volume are selected as a sample of the progress in Natural Language Processing (NLP) performed within the Italian NLP community and especially attested by the PARLI project. PARLI (Portale per l’Accesso alle Risorse in Lingua Italiana) is a project partially funded by the Ministero Italiano per l’Università e la Ricerca (PRIN 2008) from 2008 to 2012 for monitoring and fostering the harmonic growth and coordination of the activities of Italian NLP. It was proposed by various teams of researchers working in Italian universities and research institutions. According to the spirit of the PARLI project, most of the resources and tools created within the project and here described are freely distributed and they did not terminate their life at the end of the project itself, hoping they could be a key factor in future development of computational linguistics.

  16. Renewable Resources: a national catalog of model projects. Volume 3. Southern Solar Energy Center Region

    None

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Southern Solar Energy Center Region. (WHK)

  17. Renewable Resources: a national catalog of model projects. Volume 4. Western Solar Utilization Network Region

    None

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Western Solar Utilization Network Region. (WHK)

  18. An inventory of innovative policies and measures for energy efficiency. Phase 1 of the EU SAVE 'White and Green' project

    Oikonomou, V.; Patel, M.

    2004-12-01

    be considered and also modern regulatory approaches. Much attention is paid in this report to the modern market instruments, which are based on the concept of trading, with the most prominent representative being the European Emissions Trading scheme. Other more recent market based instruments discussed in this report are the White and Green Certificates. Encompassing the above, this report intends to provide an overview of all major P+M for energy efficiency improvement. The P+M are categorized according to some parameters such as a general description of the measure, the sector applied, the mechanism at work, the countries where this measure has been designed and/or implemented and the stakeholders they involve during their implementation. Furthermore, a critical assessment of each measure follows according to some criteria, like effectiveness, efficiency and goal achievement. The underlying motivation for the preparation of such an inventory of P+M is to establish the grounds for a comparative assessment of measures as they are currently discussed and/or applied in the European Union. Four P+M will then be chosen which will be then analyzed in depth in Phase II of the 'White and Green' project. In this phase simulation models will be used to study the impact of various solutions on the cost of saving energy (particularly electricity and gas), the role that different technologies could play and their expected diffusion, etc. In the context outlined above, it is clearly of interest to assess the various solutions for market-oriented policy measures aimed at increasing the efficiency in the final uses of energy, to identify the best practices and to present, to the European Commission and to the Member states, indications on the potential advantages of using such practices in the promotion of a common energy policy objective

  19. Resource Constrained Project Scheduling Subject to Due Dates: Preemption Permitted with Penalty

    Behrouz Afshar-Nadjafi

    2014-01-01

    Full Text Available Extensive research works have been carried out in resource constrained project scheduling problem. However, scarce researches have studied the problems in which a setup cost must be incurred if activities are preempted. In this research, we investigate the resource constrained project scheduling problem to minimize the total project cost, considering earliness-tardiness and preemption penalties. A mixed integer programming formulation is proposed for the problem. The resulting problem is NP-hard. So, we try to obtain a satisfying solution using simulated annealing (SA algorithm. The efficiency of the proposed algorithm is tested based on 150 randomly produced examples. Statistical comparison in terms of the computational times and objective function indicates that the proposed algorithm is efficient and effective.

  20. PROJECT-ORIENTED RESOURCE MANAGEMENT SYSTEM FOR RESPONDING TO EMERGENCIES IN RURAL AREAS

    Андрій Іванович ІВАНУСА

    2016-02-01

    Full Text Available Substantiated way to determine the feasibility of the location of rescue units in the conditions of rural areas. Proposed improving the existing methods of using of forces and means to extinguish fires, emergencies, etc., by involving specially trained volunteer rescue brigades, carrying out daily duty at their place of residence. To improve the interaction of rescue units involved in the reaction to emergency situations improved the system of information and communication management of forces and means. Developed the model diagram of the project environment optimal allocation of resources when creating center responding to emergencies in conditions of encirclement turbulent environment of a sphere of civil protection. Developed 3D-model and WBS-structure of the project creation of center responding to emergencies using modern energy saving technologies that will minimize the use of financial resources on the stages of the realization and exploitation of the project.

  1. The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

    Denis Pinha

    2016-11-01

    Full Text Available This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practical situations where the definition of optimal changes on a regular basis. The proposed approach empowers the project manager to determine what is optimal, on a given day, under the current constraints, such as, change of priorities, lack of skilled worker. The proposed method utilizes a simulation approach to determine feasible solutions, under the current constraints. Resources can be non-consumable, consumable, or doubly constrained. The paper also presents a real-life case study dealing with scheduling of ship repair activities.

  2. Integrating Vegetation Classification, Mapping, and Strategic Inventory for Forest Management

    C. K. Brewer; R. Bush; D. Berglund; J. A. Barber; S. R. Brown

    2006-01-01

    Many of the analyses needed to address multiple resource issues are focused on vegetation pattern and process relationships and most rely on the data models produced from vegetation classification, mapping, and/or inventory. The Northern Region Vegetation Mapping Project (R1-VMP) data models are based on these three integrally related, yet separate processes. This...

  3. The Federal Cylinder Project: A Guide to Field Cylinder Collections in Federal Agencies. Volume 1, Introduction and Inventory.

    Brady, Erika; And Others

    Volume one of a multivolume catalog inventories 247 federal agency collections of wax cylinder recordings made by early ethnographers during 5 decades (1890-1941) of field work with Native American, traditional American, and world cultures. Native American music, chants, and linguistic samples comprise the majority of the collection. In addition…

  4. The Italian National Forest Inventory: geographical and positioning aspects in relation to the different phases of the project

    Giacomo Colle; Antonio Floris; Gianfranco Scrinzi; Giovanni Tabacchi; Lorenzo Cavini

    2009-01-01

    In this article, we describe in depth the analysis and solutions to manage the multiple coordinates of the sampling objects coming from the three different phases of the second Italian national forest inventory (Inventario Nazionale delle Foreste e dei serbatoi forestali di Carbonio [INFC]). In particular, this article describes the criteria used to determine the...

  5. New Mexico Forest Inventory and Analysis: American Recovery and Reinvestment Act Project, Field Report: 2010-2012

    Mary Stuever; John Capuano

    2014-01-01

    For a 3-year period, from 2010-2012, the New Mexico Forestry Division utilized contractors to collect Forest Inventory and Analysis (FIA) data in New Mexico. Funded through the American Recovery and Reinvestment Act, the State partnered with the Interior West FIA Program. Together, both agencies collected data on approximately 6,450 plots. This effort represents the...

  6. A comprehensive inventory of radiological and nonradiological contaminants in waste buried or projected to be buried in the subsurface disposal area of the INEL RWMC during the years 1984-2003, Volume 1

    1995-05-01

    This report presents a comprehensive inventory of the radiological and nonradiological contaminants in waste buried or projected to be buried from 1984 through 2003 in the Subsurface Disposal Area (SDA) at the Radioactive Waste Management Complex (RWMC) of the Idaho National Engineering Laboratory. The project to compile the inventory is referred to as the recent and projected data task. The inventory was compiled primarily for use in a baseline risk assessment under the Comprehensive Environmental Response, Compensation, and Liability Act. The compiled information may also be useful for environmental remediation activities that might be necessary at the RWMC. The information that was compiled has been entered into a database termed CIDRA-the Contaminant Inventory Database for Risk Assessment. The inventory information was organized according to waste generator and divided into waste streams for each generator. The inventory is based on waste information that was available in facility operating records, technical and programmatic reports, shipping records, and waste generator forecasts. Additional information was obtained by reviewing the plant operations that originally generated the waste, by interviewing personnel formerly employed as operators, and by performing nuclear physics and engineering calculations. In addition to contaminant inventories, information was compiled on the physical and chemical characteristics and the packaging of the 99 waste streams. The inventory information for waste projected to be buried at the SDA in the future was obtained from waste generator forecasts. The completeness of the contaminant inventories was confirmed by comparing them against inventories in previous reports and in other databases, and against the list of contaminants detected in environmental monitoring performed at the RWMC

  7. Managing large energy and mineral resources (EMR) projects in challenging environments

    Chanmeka, Arpamart

    The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their

  8. Inventory of Federal energy-related environment and safety research for FY 1977. Volume II. Project listings

    1978-07-01

    This volume contains Biomedical and Environmental Research, Environmental Control Technology Research, and Operational and Environmental Safety Research project listings. The projects are ordered numerically by log number.

  9. Preliminary publications book 2 from project on mineral resources, metallogenesis, and tectonics of northeast Asia

    Nokleberg, Warren J.; Miller, Robert J.; Naumova, Vera V.; Khanchuk, Alexander I.; Parfenov, Leonid M.; Kuzmin, Mikhail I.; Bounaeva, Tatiana M.; Obolenskiy, Alexander A.; Rodionov, Sergey M.; Seminskiy, Zhan V.; Diggles, Michael F.

    2003-01-01

    This is the Web version of a CD-ROM publication. This report consists of summary major compilations and syntheses accomplished in the six-year project through April 2003 for the study on the Mineral Resources, Metallogenesis, and Tectonics of Northeast Asia (Eastern and Southern Siberia, Mongolia, Northeastern China, South Korea, and Japan). The major scientific goals and benefits of the project are to: (1) provide a comprehensive international data base on the mineral resources of the region that is the first, extensive knowledge available in English; (2) provide major new interpretations of the origin and crustal evolution of mineralizing systems and their host rocks, thereby enabling enhanced, broad-scale tectonic reconstructions and interpretations; and (3) promote trade and scientific and technical exchanges between the North America and Northeast Asia. Data from the project are providing sound scientific data and interpretations for commercial firms, governmental agencies, universities, and individuals that are developing new ventures and studies in the project area, and for land-use planning studies that deal with both mineral potential issues. Northeast Asia has vast potential for known and undiscovered mineral deposits; however, little information existed in English in the West until publication of products from this project. Consequently, data and interpretations from the project are providing basic knowledge for major scientific, commercial, national, and international endeavors by other interested individuals and groups.

  10. The CARIPANDA project: Climate change and water resources in the Adamello Natural Park of Italy

    Bocchiola, D.

    2009-04-01

    The three years (2007-2009) CARIPANDA project funded by the Cariplo Foundation of Italy is aimed to evaluate scenarios for water resources in the Adamello natural Park of Italy in a window of 50 years or so (until 2050). The project is led by Ente Parco Adamello and involves Politecnico di Milano, Università Statale di Milano, Università di Brescia, and ARPA Lombardia as scientific partners, while ENEL hydropower Company of Italy joins the project as stake holder. The Adamello Natural Park is a noteworthy resource in the Italian Alps. The Adamello Group is made of several glacierized areas (c. 24 km2), of both debris covered and free ice types, including the widest Italian Glacier, named Adamello, spreading on an area of about c. 18 km2. Also the Adamello Natural Reserve, covering 217 km2 inside the Adamello Park and including the Adamello glaciers, hosts a number of high altitude safeguarded vegetal and animal species, the safety of which is a primary task of the Reserve. Project's activity involves analysis of local climate trend, field campaigns on glaciers, hydrological modelling and remote sensing of snow and ice covered areas, aimed to build a consistent model of the present hydrological conditions and of the areas. Then, properly tailored climate change projections for the area, obtained using local data driven downscaling of climate change projections from GCMs model, are used to infer the likely response to expected climate change conditions. With two years in the project now some preliminary findings can be highlighted and some preliminary trend analysis carried out. The proposed poster provides a resume of the main results of the project insofar, of interest as a benchmark for similar ongoing and foregoing projects about climate change impact on European mountainous natural areas.

  11. Increasing the Value of Research: A Comparison of the Literature on Critical Success Factors for Projects, IT Projects and Enterprise Resource Planning Projects

    Annie Maddison Warren

    2016-11-01

    Full Text Available Since the beginning of modern project management in the 1960s, academic researchers have sought to identify a definitive list of Critical Success Factors (CSFs, the key things that project managers must get right in order to deliver a successful product. With the advent of Information Technology (IT projects and, more recently, projects to deliver Enterprise Resource Planning (ERP systems, attention has turned to identifying definitive lists of CSFs for these more specific project types. The purpose of this paper is to take stock of this research effort by examining how thinking about each type of project has evolved over time, before producing a consolidated list of CSFs for each as a basis for comparison. This process reveals a high degree of similarity, leading to the conclusion that the goal of identifying a generic list of CSFs for project management has been achieved. Therefore, rather than continuing to describe lists of CSFs, researchers could increase the value of their contribution by taking a step forward and focusing on why, despite this apparent knowledge of how to ensure their success, ERP projects continue to fail.

  12. Implications of applying solar industry best practice resource estimation on project financing

    Pacudan, Romeo

    2016-01-01

    Solar resource estimation risk is one of the main solar PV project risks that influences lender’s decision in providing financing and in determining the cost of capital. More recently, a number of measures have emerged to mitigate this risk. The study focuses on solar industry’s best practice energy resource estimation and assesses its financing implications to the 27 MWp solar PV project study in Brunei Darussalam. The best practice in resource estimation uses multiple data sources through the measure-correlate-predict (MCP) technique as compared with the standard practice that rely solely on modelled data source. The best practice case generates resource data with lower uncertainty and yields superior high-confidence energy production estimate than the standard practice case. Using project financial parameters in Brunei Darussalam for project financing and adopting the international debt-service coverage ratio (DSCR) benchmark rates, the best practice case yields DSCRs that surpass the target rates while those of standard practice case stay below the reference rates. The best practice case could also accommodate higher debt share and have lower levelized cost of electricity (LCOE) while the standard practice case would require a lower debt share but having a higher LCOE. - Highlights: •Best practice solar energy resource estimation uses multiple datasets. •Multiple datasets are combined through measure-correlate-predict technique. •Correlated data have lower uncertainty and yields superior high-confidence energy production. •Best practice case yields debt-service coverage ratios (DSCRs) that surpass the benchmark rates. •Best practice case accommodates high debt share and have low levelized cost of electricity.

  13. MANAGING THE INTERACTION OF RESOURCE DISTRIBUTION IN PROJECT MANAGEMENT OF IMPLEMENTATION AND FUNCTIONING OF EMERGENCY CALL SYSTEMS

    Дмитро Сергійович КОБИЛКІН

    2016-02-01

    Full Text Available There have been proposed to use a mobile module "Resources manager" and its component model – scheme for managing the distribution of resources during the project management of implementation and functioning of System 112 in Ukraine. Are described the formalized tasks of performance the processes of managing the model – scheme at all stages of the projects life cycle. Also is developed the model – scheme interaction the blocks of the mobile module of resource management at the System 112 project. It describes the step by step interaction of blocks project management with the project data for successful project implementation and obtaining a product of the project, pointing out the environmental impact of the project on each of the project blocks. The conclusions about the expediency and efficiency of implementation of model – scheme in conditions of managing the emergency call systems at a single number were made.

  14. Into the new electricity age with Optimal integration of decentralized energy resources - The FENIX Project

    Cech, Heinz; Fuchs, Erich; Heher, Anton; Ilo, Albana; Sezi, Tevfik; Trimmel, Johann; Werner, Thomas; Marti-Rodriguez, Juan

    2010-09-15

    Decentralized Energy Resources (DERs) will play a significant role in future energy scenarios. Today, the 'plug and forget' connection principle for renewable energy resources has the goal to maximize the active power transfer, without using their real capabilities. Other DERs based on fossil fuels are only activated in emergency situations. This paper describes the results of a demonstration project, where DERs installed in a large distribution area are utilized for participating in the day ahead energy market, frequency and voltage support for the transmission system, voltage support at specific distribution locations and feeders, and stability support in emergency situations.

  15. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Turkey

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) mission to Turkey. The IUREP Orientation Phase mission to Turkey estimates that the Speculative Resources of that country fall within the range of 21 000 to 55 000 tonnes of uranium. This potential is expected to lie in areas of Neogene and possibly other Tertiary sediments, in particular in the areas of the Menderes Massif and Central Anatolia. The mission describes a proposed exploration programme with expenditures over a five year period of between $80 million and $110 million, with nearly half of the amount being spent on drilling. (author)

  16. Mars Atmospheric In Situ Resource Utilization Projects at the Kennedy Space Center

    Muscatello, A. C.; Hintze, P. E.; Caraccio, A. J.; Bayliss, J. A.; Karr, L. J.; Paley, M. S.; Marone, M. J.; Gibson, T. L.; Surma, J. M.; Mansell, J. M.; hide

    2016-01-01

    The atmosphere of Mars, which is approximately 95% carbon dioxide (CO2), is a rich resource for the human exploration of the red planet, primarily by the production of rocket propellants and oxygen for life support. Three recent projects led by NASA's Kennedy Space Center have been investigating the processing of CO2. The first project successfully demonstrated the Mars Atmospheric Processing Module (APM), which freezes CO2 with cryocoolers and combines sublimated CO2 with hydrogen to make methane and water. The second project absorbs CO2 with Ionic Liquids and electrolyzes it with water to make methane and oxygen, but with limited success so far. A third project plans to recover up to 100% of the oxygen in spacecraft respiratory CO2. A combination of the Reverse Water Gas Shift reaction and the Boudouard reaction eventually fill the reactor up with carbon, stopping the process. A system to continuously remove and collect carbon is under construction.

  17. Mars Atmospheric In Situ Resource Utilization Projects at the Kennedy Space Center

    Muscatello, Anthony; Hintze, Paul; Meier, Anne; Bayliss, Jon; Karr, Laurel; Paley, Steve; Marone, Matt; Gibson, Tracy; Surma, Jan; Mansell, Matt; hide

    2016-01-01

    The atmosphere of Mars, which is 96 percent carbon dioxide (CO2), is a rich resource for the human exploration of the red planet, primarily by the production of rocket propellants and oxygen for life support. Three recent projects led by NASAs Kennedy Space Center have been investigating the processing of CO2. The first project successfully demonstrated the Mars Atmospheric Processing Module (APM), which freezes CO2 with cryocoolers and combines sublimated CO2 with hydrogen to make methane and water. The second project absorbs CO2 with Ionic Liquids and electrolyzes it with water to make methane and oxygen, but with limited success so far. A third project plans to recover up to 100 of the oxygen in spacecraft respiratory CO2. A combination of the Reverse Water Gas Shift reaction and the Boudouard reaction eventually fill the reactor up with carbon, stopping the process. A system to continuously remove and collect carbon has been tested with encouraging results.

  18. Inventory of existing heat pump projects and the use of solar energy for heat pumps in the Dutch house construction sector

    1997-01-01

    The aim of the title inventory is to learn from the experiences with heat pump projects in the Netherlands. Descriptions are given of practical experiences with heat pump applications in the last 15 years in the housing sector. Possible and feasible heat pump system concepts are analyzed and energy balances and energy consumption are calculated. Special attention is paid to the use of solar energy in combination with electric (compression) heat pumps. One of the most important bottlenecks is the method and availability of heat extraction: the choice for the different options is determined by investment costs, permission, regulations, and local conditions. 14 refs., 4 appendices

  19. The In-Situ Resource Utilization Project Under the New Exploration Enterprise

    Larson, William E.; Sanders, Gerald B.

    2010-01-01

    The In Situ Resource Utilization Project under the Exploration Technology Development Program has been investing in technologies to produce Oxygen from the regolith of the moon for the last few years. Much of this work was demonstrated in a lunar analog field demonstration in February of 2010. This paper will provide an overview of the key technologies demonstrated at the field demonstration will be discussed a long with the changes expected in the ISRU project as a result of the new vision for Space Exploration proposed by the President and enacted by the Congress in the NASA Authorization Act of2010.

  20. Resource-constrained project scheduling problem: review of past and recent developments

    Farhad Habibi

    2018-01-01

    Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.

  1. Clinical Decision Support (CDS) Inventory

    U.S. Department of Health & Human Services — The Clinical Decision Support (CDS) Inventory contains descriptions of past and present CDS projects across the Federal Government. It includes Federal projects,...

  2. The Project Activities of the Renewable Energy Resources Use in the Republic of Serbia

    Larisa Jovanović

    2014-09-01

    Full Text Available With the ratification of the Energy Community of Southeast Europe countries (14th July 2006 the Republic of Serbia, among other things, accepted the obligation to adopt and implement a plan of applying the Directive 2001/77/EC about promoting the production of electrical energy from renewable energy sources. The projects of the renewable energy resources use have a positive impact on the environment, in particular about the mitigation of global climate change and local environmental sustainability.

  3. Crew Resource Management (CRM) video storytelling project: a team-based learning activity

    Ma, Maggie Jiao; Denando, John

    2011-01-01

    This Crew Resource Management (CRM) video storytelling project asks students to work in a team (4-5 people per team) to create (write and produce) a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management). The activity is composed of two parts: (1) creating a video story of CRM in aviation, and (2) delivering a group pr...

  4. A review and an outlook of the National Cultural Information Resources Sharing Project

    ZHANG; Yanbo

    2008-01-01

    This paper discusses the Project’s organization system,technical system,creation of digital resources and service mode.It also summarizes achievements gained since the commencement of the Project,and also analyzes some of the more important issues during implementation stage and gives a few suggestions of the future development during the next stage of the 11thFive-Year Plan.

  5. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Madagascar

    1985-01-01

    A report has recently been made public which describes the findings of the International Uranium Resources Evaluation Project (IUREP) Mission to Madagascar. The IUREP Orientation Phase Mission to Madagascar estimates the Speculative Resources of that country to be within the wide range of 4 000 to 38 000 tonnes uranium. Such resources could lie in areas with known occurrences (uranothorianite, Ft. Dauphin up to 5 000 t U, i.e. 'pegmatoids'; uranocircite, Antsirabe up to 3 000 t U in Neogene sediments; carnotiteautonite, Karoo area up to 30 000 t U in sandstones and in areas with as yet untested environments (e.g. related to unconformities and calcretes). Modifications to existing uranium exploration programmes are suggested and policy alternatives reviewed. No specific budget is proposed. (author)

  6. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Uganda

    1985-01-01

    A full report has been compiled describing the findings of the International Uranium Resources Evaluation Project (IUREP) Orientation Phase Mission to Uganda. The Mission suggest that the speculative uranium resources of the country could be within the very wide range of 0 to 105 000 tonnes of uranium metal. The Mission finds that most of these speculative resources are related to Proterozoic unconformities and to Cenozoic sandstones of the Western Rift Valley. Some potential is also associated with Post-tectonic granites. The Mission recommends to rehabilitate the Geological Survey of Uganda in order to enable it to conduct and support a uranium exploration programme for unconformity related and for standstone hosted uranium deposits. Recommended exploration methods encompass geological mapping and compilation, an airborne gamma-ray spectrometer survey north of 1 deg. North latitude, stream sediment sampling, and ground scintillometric surveys in favourable areas. Follow up work should include VLF-EM surveys, emanometry and drilling. (author)

  7. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance for Geothermal Resource Evaluation Projects

    Robert P. Breckenridge; Thomas R. Wood; Joel Renner

    2010-09-01

    The purpose of this document is to report on the evaluation of geothermal resource potential on and around three different United States (U. S.) Air Force Bases (AFBs): Nellis AFB and Air Force Range (AFR) in the State of Nevada (see maps 1 and 5), Holloman AFB in the State of New Mexico (see map 2), and Mountain Home AFB in the State of Idaho (see map 3). All three sites are located in semi-arid parts of the western U. S. The U. S. Air Force, through its Air Combat Command (ACC) located at Langley AFB in the State of Virginia, asked the Federal Energy Management Program (FEMP) for technical assistance to conduct technical and feasibility evaluations for the potential to identify viable geothermal resources on or around three different AFBs. Idaho National Laboratory (INL) is supporting FEMP in providing technical assistance to a number of different Federal Agencies. For this report, the three different AFBs are considered one project because they all deal with potential geothermal resource evaluations. The three AFBs will be evaluated primarily for their opportunity to develop a geothermal resource of high enough quality grade (i.e., temperature, productivity, depth, etc.) to consider the possibility for generation of electricity through a power plant. Secondarily, if the resource for the three AFBs is found to be not sufficient enough for electricity generation, then they will be described in enough detail to allow the base energy managers to evaluate if the resource is suitable for direct heating or cooling. Site visits and meetings by INL personnel with the staff at each AFB were held in late FY-2009 and FY-2010. This report provides a technical evaluation of the opportunities and challenges for developing geothermal resources on and around the AFBs. An extensive amount of literature and geographic information was evaluated as a part of this assessment. Resource potential maps were developed for each of the AFBs.

  8. Managing aquatic ecosystems and water resources under multiple stress--an introduction to the MARS project.

    Hering, Daniel; Carvalho, Laurence; Argillier, Christine; Beklioglu, Meryem; Borja, Angel; Cardoso, Ana Cristina; Duel, Harm; Ferreira, Teresa; Globevnik, Lidija; Hanganu, Jenica; Hellsten, Seppo; Jeppesen, Erik; Kodeš, Vit; Solheim, Anne Lyche; Nõges, Tiina; Ormerod, Steve; Panagopoulos, Yiannis; Schmutz, Stefan; Venohr, Markus; Birk, Sebastian

    2015-01-15

    Water resources globally are affected by a complex mixture of stressors resulting from a range of drivers, including urban and agricultural land use, hydropower generation and climate change. Understanding how stressors interfere and impact upon ecological status and ecosystem services is essential for developing effective River Basin Management Plans and shaping future environmental policy. This paper details the nature of these problems for Europe's water resources and the need to find solutions at a range of spatial scales. In terms of the latter, we describe the aims and approaches of the EU-funded project MARS (Managing Aquatic ecosystems and water Resources under multiple Stress) and the conceptual and analytical framework that it is adopting to provide this knowledge, understanding and tools needed to address multiple stressors. MARS is operating at three scales: At the water body scale, the mechanistic understanding of stressor interactions and their impact upon water resources, ecological status and ecosystem services will be examined through multi-factorial experiments and the analysis of long time-series. At the river basin scale, modelling and empirical approaches will be adopted to characterise relationships between multiple stressors and ecological responses, functions, services and water resources. The effects of future land use and mitigation scenarios in 16 European river basins will be assessed. At the European scale, large-scale spatial analysis will be carried out to identify the relationships amongst stress intensity, ecological status and service provision, with a special focus on large transboundary rivers, lakes and fish. The project will support managers and policy makers in the practical implementation of the Water Framework Directive (WFD), of related legislation and of the Blueprint to Safeguard Europe's Water Resources by advising the 3rd River Basin Management Planning cycle, the revision of the WFD and by developing new tools for

  9. Strategically oriented management and controlling of resource intensive projects; Strategieorientiertes Management und Controlling ressourcenintensiver Projekte. Fallstudienanalyse und Konzeption eines Referenzmodells zum Projektmanagement der Stilllegung kerntechnischer Anlagen

    Kemmeter, Sascha

    2015-07-01

    The book on strategically oriented management and controlling of resource intensive projects covers the following issues: frame of project management and project controlling, classification of the decommissioning of nuclear facilities as resource intensive projects, research design for case studies, results of the study of project management specific characteristics of decommissioning, reference model for the project management of nuclear facility decommissioning.

  10. Inventory of Information Resources; A Comparison of the American Geological Institute (AGI) Pilot Project with the National Referral Center (NRC) Inventory.

    Price, John F.

    The National Referral Center (NRC) and its many services to the scientific and technical community are discussed in some detail as a preamble to a proposal of a cooperative arrangement between NRC and the American Geological Institute (AGI), its supporting societies, and all geoscientists in a combined effort to enlarge and maintain a…

  11. PROJECT MANAGEMENT FOR THE STATE-GOVERNED GEOLOGICAL EXPLORATION OF MINERAL RESOURCES

    A. M. Lygin

    2018-03-01

    Full Text Available The relevance of the research. Creating high-efficient and innovation-oriented system of studying the subsoil and the mineral resource base is one of the priority areas of developing the geological sphere. The purpose of the present study is to substantiate the rationale for the adoption of the project management methods for the exploration work. Research methods: method of system analysis, method of comparison and analogies, and method of scientific generalization. The results and their application. This article deals with the content of the main standard legislative documents which determine the strategy and lines of the country’s geological sector development in the nearest future. The article discloses the purposes and their strategic objectives and the content of the state program of the Russian Federation called “Reproduction and use of natural resources”. The resource support of the program and its subroutines is also revealed. The structure of geological industry management in modern conditions is presented. The main activities for restructuring of the geological industry are set out. They include the following points. The transformation of the Federal state unitary enterprises of information and expert profile, the advancement of scientific organizations engaged in scientific and analytical support of performed public functions. These functions are concerned with the geological study of subsoil and reproduction of the mineral resource base, as well as improving its management. The consolidation of specialized geological organizations on the types of exploration and mining, and also the main results of reorganization of the enterprises is taken into account. All of the aforementioned is subordinated to and is conducted by the Federal Agency for subsoil management. The shortcomings of the current system of management of works on the state geological study of the subsoil were revealed at the expense of the Federal budget. The

  12. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    None

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV.

  13. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV

  14. [Physical projects atelier: strategy for physical resources administration learning on nursing].

    Draganov, Patricia Bover; Sanna, Maria Cristina

    2011-09-01

    The success of learning involves adequate strategies. Those inspired on andragogy, which is the science of teaching adults, seem to be ideal for the nursing undergraduate subject "projects", with a focus on the administration of physical resources for nursing. This study reports teaching strategies that try to estimulate the acquisition of competences that make the nurse capable of a dialogue on projects with a multiprofessional team. The strategy involved a workshop composed by four stages: reading of projects, health assistance institute (HAI) attributions, notions on physical scaling strategies and development of a glossary. The strategy, proposed by a graduate student in the subject "Strategies to the teaching of Administration", was tested through practical application, evaluated and approved by graduate students and teachers. The conditions for its implementation are working with few students, availability of proper classrooms and equipment, and partnership with HAIs.

  15. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  16. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Zambia

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) mission to Zambia. The IUREP Orientation Phase mission to Zambia estimates that the Speculative Resources of that country fall within the range of 33 000 and 100 000 tonnes uranium. The majority of these resources are believed to exist in the Karoo sediments. Other potentially favourable geological environments are the Precambrian Katanga sediments, as well as intrusive rocks of different chemical compositions and surficial duricrusts. Previous unofficial estimates of Zambia's Reasonably Assured Resources (RAR) and Estimated Additional Resources (EAR) are considered to be still valid: the total RAR amount to 6 000 tonnes uranium, located in Karoo (4 000 tonnes) and Katanga (2 000 tonnes) sediments, while the EAR are believed to total 4 000 tonnes being found only in Karoo sediments. The mission recommends that approximately US$ 40 million be spent on uranium exploration in Zambia over 10 years. The largest part of this expenditure would be for drilling, while the remainder should be spent on airborne and ground surveys, as well as on interpretative work on previous airborne data, Landsat imageries, etc. (author)

  17. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Somalia

    1985-01-01

    A full report has been compiled describing the findings of the International Uranium Resources Evaluation Project (IUREP) Orientation Phase Mission to Somalia. The Mission suggests that in addition to the reasonably assured resources (RAR) of 5 000 t uranium and estimated additional resources (EAR) of 11 000 t uranium in calcrete deposits, the speculative resources (SR) could be within the wide range of 0 - 150 000 t uranium. The majority of these speculative resources are related to sandstone and calcrete deposits. The potential for magmatic hydrothermal deposits is relatively small. The Mission recommends an exploration programme of about US$ 22 000 000 to test the uranium potential of the country which is thought to be excellent. The Mission also suggests a reorganization of the Somalia Geological Survey in order to improve its efficiency. Recommended methods include geological mapping, Landsat imagery interpretation, airborne and ground scintillometer surveys, and geochemistry. Follow-up radiometric surveys, exploration geophysics, mineralogical studies, trenching and drilling are proposed in favourable areas. (author)

  18. Final project memorandum: sea-level rise modeling handbook: resource guide for resource managers, engineers, and scientists

    Doyle, Thomas W.

    2015-01-01

    Coastal wetlands of the Southeastern United States are undergoing retreat and migration from increasing tidal inundation and saltwater intrusion attributed to climate variability and sea-level rise. Much of the literature describing potential sea-level rise projections and modeling predictions are found in peer-reviewed academic journals or government technical reports largely suited to reading by other Ph.D. scientists who are more familiar or engaged in the climate change debate. Various sea-level rise and coastal wetland models have been developed and applied of different designs and scales of spatial and temporal complexity for predicting habitat and environmental change that have not heretofore been synthesized to aid natural resource managers of their utility and limitations. Training sessions were conducted with Federal land managers with U.S. Fish and Wildlife Service, National Park Service, and NOAA National Estuarine Research Reserves as well as state partners and nongovernmental organizations across the northern Gulf Coast from Florida to Texas to educate and to evaluate user needs and understanding of concepts, data, and modeling tools for projecting sea-level rise and its impact on coastal habitats and wildlife. As a result, this handbook was constructed from these training and feedback sessions with coastal managers and biologists of published decision-support tools and simulation models for sea-level rise and climate change assessments. A simplified tabular context was developed listing the various kinds of decision-support tools and ecological models along with criteria to distinguish the source, scale, and quality of information input and geographic data sets, physical and biological constraints and relationships, datum characteristics of water and land elevation components, utility options for setting sea-level rise and climate change scenarios, and ease or difficulty of storing, displaying, or interpreting model output. The handbook is designed

  19. Evaluating the mathematical models to Solve Job Shop Problem with the Use of human resources specialists in projects

    Renato Penha

    2012-10-01

    Full Text Available A project can be defined as a complex system. This requires the use of resources (human, material, technology, etc., allocated among alternative uses, as a means to achieve specific goals by the presence of constraints of different orders. The planning, allocation and prioritization of resources, including human resource specialists (HRE, is performed by means of single project management.This treatment can cause internal strife by using the same resource or even its underuse, and may worsen in software development environments due to the high degree of interdependence, uncertainty and risk of each project. This need is related to the so called Job Shop Problem (JSP. In this context, the objective of this study is to evaluate the mathematical models of genetic algorithm and optimization and their contributions to solve Job Shop Problem in software development projects with the use of human resources specialists.

  20. South Asia river-flow projections and their implications for water resources

    Mathison, C.; Wiltshire, A. J.; Falloon, P.; Challinor, A. J.

    2015-12-01

    South Asia is a region with a large and rising population, a high dependence on water intense industries, such as agriculture and a highly variable climate. In recent years, fears over the changing Asian summer monsoon (ASM) and rapidly retreating glaciers together with increasing demands for water resources have caused concern over the reliability of water resources and the potential impact on intensely irrigated crops in this region. Despite these concerns, there is a lack of climate simulations with a high enough resolution to capture the complex orography, and water resource analysis is limited by a lack of observations of the water cycle for the region. In this paper we present the first 25 km resolution regional climate projections of river flow for the South Asia region. Two global climate models (GCMs), which represent the ASM reasonably well are downscaled (1960-2100) using a regional climate model (RCM). In the absence of robust observations, ERA-Interim reanalysis is also downscaled providing a constrained estimate of the water balance for the region for comparison against the GCMs (1990-2006). The RCM river flow is routed using a river-routing model to allow analysis of present-day and future river flows through comparison with available river gauge observations. We examine how useful these simulations are for understanding potential changes in water resources for the South Asia region. In general the downscaled GCMs capture the seasonality of the river flows but overestimate the maximum river flows compared to the observations probably due to a positive rainfall bias and a lack of abstraction in the model. The simulations suggest an increasing trend in annual mean river flows for some of the river gauges in this analysis, in some cases almost doubling by the end of the century. The future maximum river-flow rates still occur during the ASM period, with a magnitude in some cases, greater than the present-day natural variability. Increases in river flow

  1. National dam inventory provides data for analysis

    Spragens, L.

    1992-01-01

    The Association of State Dam Safety Officials completed a dam inventory this fall. Information on approximately 90,000 state-regulated dams in the US collected during the four-year inventory is being used to build a database managed by the Federal Emergency Management Agency. In addition to ASDSO's work, the federal government conducted an inventory of federal dams. This data will be added to the state information to form one national database. The database will feature 35 data fields for each entry, including the name of the dam, its size, the name of the nearest downstream community, maximum discharge and storage volume, the date of the last inspection, and details about the emergency action plan. The program is an update of the nation's first dam inventory, required by the Dam Safety Act of 1972. The US Army Corps of Engineers completed the original inventory in 1981. The Water Resources Development Act of 1986 authorized appropriations of $2.5 million for the Corps to update the inventory. FEMA and the Corps entered into an agreement for FEMA to undertake the task for the Corps and to coordinate work on both the federal and state inventories. ASDSO compiles existing information on state-regulated dams into a common format for the database, added missing information, and established a process for continually updating data. ASDSO plans to analyze the information collected for the database. It will look at statistics for the number of dams regulated, communities that could be affected, and the number of high-hazard dams. FEMA is preparing reports for Congress on the project. The reports, which are expected to be ready by May 1993, will include information on the methodology used and facts about regulated dams under state jurisdiction

  2. Coastal seas as resource for Blue Growth - SmartSea project

    Kotilainen, Aarno; Alvi, Kimmo; Boman, Anton; Hämäläinen, Jyrki; Kaskela, Anu; Rantataro, Jyrki; Vallius, Henry; Virtasalo, Joonas

    2017-04-01

    Blue growth is a long term strategy of the European Union (EU) to enhance the sustainable growth of the maritime sector. Our surrounding seas have been drivers for the European economy for a long time, but still they have great potential for further exploiting of natural resources and economic growth. Especially if the growth can be achieved in an environmentally sustainable way, benefits are obvious. It has been estimated that improvement of the state of the Baltic Sea would until 2030 create 900 000 jobs in the whole Baltic Sea area, mainly in Blue Tech, tourism, real estate and building businesses (Dahlgren et al. 2015). However, coastal seas already experience multiple stressors like off-shore construction, pollution, eutrophication, shipping, over-fishing, and climate change. In order to obtain sustainable Blue Growth, it is necessary to localize and assess the current maritime activities, estimate their growth potential, and investigate their present and future effects on each other and on the marine environment. The purpose of the SmartSea project is to support the growth of commercial marine activities in the Gulf of Bothnia region, in the northern Baltic Sea. The Gulf of Bothnia is an essential resource in terms of fish farming and wind power, for example, and it is also possible to make use of the geological resources of the gulf. Moreover, the rapid growth of the commercial marine activities and the consequences of the climate change may lead to conflicts between the different activities and harm the marine ecosystem of the Gulf of Bothnia. The SmartSea project aims to identify these risks and find solutions for the sustainable use of the sea. SmartSea project is funded by the Strategic Research Council of Academy of Finland, grant No: 292 985. The project will last for six years (2015-2020) and its funding totals nearly 8 million euros. The project involves close to 40 researchers from eight different institutions: the Finnish Meteorological Institute

  3. Project ECHO: A Telementoring Program for Cervical Cancer Prevention and Treatment in Low-Resource Settings

    Melissa S. Lopez

    2017-10-01

    Full Text Available Cervical cancer incidence and mortality rates are significantly higher in low- and middle-income countries compared with the United States and other developed countries. This disparity is caused by decreased access to screening, often coupled with low numbers of trained providers offering cancer prevention and treatment services. However, similar disparities are also found in underserved areas of the United States, such as the Texas-Mexico border, where cervical cancer mortality rates are 30% higher than in the rest of Texas. To address these issues, we have adopted the Project ECHO (Extension for Community Healthcare Outcomes program, a low-cost telementoring model previously proven to be successful in increasing local capacity, improving patient management skills, and ultimately improving patient outcomes in rural and underserved areas. We use the Project ECHO model to educate local providers in the management of cervical dysplasia in a low-resource region of Texas and have adapted it to inform strategies for the management of advanced cervical and breast cancer in Latin America and sub-Saharan Africa. This innovative approach, using ECHO, is part of a larger strategy to enhance clinical skills and develop collaborative projects between academic centers and partners in low-resource regions.

  4. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    None

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.

  5. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume

  6. Natural resource risk and cost management in environmental restoration: Demonstration project at the Savannah River Site

    Bascietto, J.J.; Sharples, F.E.

    1995-01-01

    The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff's understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues

  7. Archeological and Historic Cultural Resources Inventory for a Proposed Flood Control Project at Devils Lake, Ramsey County, North Dakota.

    1983-10-01

    Chautauqua Association signed a contract with J.H. McCulloch to secure a right-of- way for the Chautauqua Railway. McCulloch received a 30 year franchise in...excavation at Bakery of U.S. military fort Palo Duro St. Park, TX; Test excavation at historic dugout Sea Rim State Park, TX; Archaeological survey San

  8. Archeological and Historic Cultural Resources Inventory for a Proposed Flood Control Project at Grafton, Walsh County, North Dakota.

    1983-10-01

    10,000 B.C. to 6000 B.C.) subsistence was based primarily on exploitation of herds of big game animals, popularly referred to as megafauna. Much of this...Alkire Mound (32SI200), and Porcupine Creek Component (32SI6, an occupation site) , all located on the Missouri River and north of the North Dakota...attempting to form any idea of the numerous herds of buffalo which must have passed here" (Harold Printing Co. 1909). It is likely that such a region would

  9. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Rwanda

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) Mission to Rwanda. The IUREP Orientation Phase Mission to Rwanda estimates that the Speculative Resources of that country fall within the range of 500 to 5 000 tonnes of uranium. The majority of this potential is expected to be located in the Precambrian Ruzizian, especially in conjunction with tectonized pegmatoidal remobilizations of metamorphic sediments of western Rwanda. Other favourable geological environments include lamprophyric dikes and post tectonic granites of central Rwanda. The Mission recommends that over a period of five years approximately US$4.2 million be spent on exploration in Rwanda. The majority of this would be spent on airborne and ground geophysical surveys ($1.5 million) and exploration drilling ($1 million). Prospecting, trenching and tunneling and analytical work would require the remainder of the $4.2 million ($1.7 million). (author)

  10. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Colombia

    1984-01-01

    A full report has been released describing the findings of the International Uranium Resources Evaluation Project (IUREP) Orientation Phase Mission to Colombia. The Mission suggests that the speculative uranium resources of the country could be within the very wide range of 20 000 tonnes of 220 000 tonnes of uranium metal. The Mission finds that the area with the highest potential is the Llanos Orientales (Interior Zone), which has the potential of hosting quartz-pebble conglomerate deposits, Proterozoic unconformity-related deposits and sandstone deposits. The Mission recommends that approximately US$80 million should be expended in a phased ten-year exploration programme. It is likely that the majority of the funds will be needed for drilling, followed by ground surveys and airborne radiometry. It is the opinion of the Mission that the considerable funds required for the proposed programme could most suitably be raised by inviting national or foreign commercial organizations to participate under a shared production agreement. (author)

  11. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Burundi

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) Mission to Burundi. The IUREP Orientation Phase Mission to Burundi estimates that the Speculative Resources of that country fall within the range of 300 to more than 4 100 tonnes of uranium. The potential is rather evenly distributed throughout the Proterozoic of Burundi in various geological environments (unconformity, hydrothermal, fault controlled, etc.). The mission recommends that over a period of five years U.S. $ 3 to 4.5 million be spent on exploration in Burundi, with even spending on the various exploration techniques as e.g. prospecting, drilling trenching, geophysical surveys, analyses, etc. (author)

  12. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Bolivia

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) mission to Bolivia. The IUREP Orientation Phase mission to Bolivia estimates that the Speculative Uranium Resources of that country fall within the range of 100 to 107 500 tonnes uranium. The majority of this potential is expected to be located in the Precambrian crystalline and sedimentary rocks of the southwestern part of the Central Brazilian Shield. Other potentially favourable geologic environments include Palaeozoic two mica granites and their metasedimentary hosts, Mesozoic granites and granodiorites as well as the intruded formations and finally Tertiary acid to intermediate volcanics. The mission recommends that approximately US$ 13 million be spent on exploration in Bolivia over a five-year period. The majority of this expenditure would be for airborne and surface exploration utilising geologic, magnetometric, radiometric, and geochemical methods and some pitting, trenching, tunneling and drilling to further evaluate the discovered occurrences. (author)

  13. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Venezuela

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) mission to Venezuela. The IUREP Orientation Phase mission to Venezuela estimates that the Speculative Resources of that country fall within the range 2,000 to 42,000 tonnes uranium.- The majority of this potential is expected to be located in the Precambrian crystalline and sedimentary rocks of the Guayana Shield. Other potentially favorable geologic environments include Cretaceous phosphorite beds, continental sandstone and granitic rocks. The mission recommends that approximately US $18 million be spent on exploration in Venezuela over the next five years. The majority of this expenditure would be for surface surveys utilizing geologic studies, radiometric and geochemical surveys and some drilling for geologic information. Additional drilling would be required later to substantiate preliminary findings. (author)

  14. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Peru

    1984-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (TUREP) Mission to Peru. The IUREP Orientation Phase Mission to Peru estimates that the Speculative Resources of that country fall within the range of 6 000 to 11 000 tonnes uranium. The majority of this potential is expected to be located in Late Tertiary ignimbrites and associated sediments in the high Andes of southern Peru. Other favourable geological environments include calcretes, developed from Tertiary volcanogenic sources over the Precambrian in the Pacific Coastal desert in southern Peru, and Hercynian subvolcanic granites in the eastern Cordillera of southern Peru. The Mission recommends that over a period of five years approximately U.S. $10 million be spent on exploration in Peru. The majority of this would be spent on drilling ($5 million) and tunnelling ($2 million) with an additional $3 million on surface and airborne radiometric surveys. (author)

  15. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Cameroon

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) Mission to Cameroon. The IUREP Orientation Phase Mission to Cameroon estimates the Speculative Resources of that country to be in the order of 10 000 tonnes uranium for syenite-associated U-deposits in southern Cameroon, and in the order of 5 000 tonnes uranium for uranium deposits associated with albitized and desilicified late tectonic Panafrican granites (episyenite) and Paleozoic volcanics in northern Cameroon. No specific tonnage is given for Francevillian equivalents (DJA-Series) and for Mesozoic and Cenozoic sedimentary basins, which are thought to hold limited potential for sandstone hosted uranium. However the Douala basin, consisting of mixed marine and continental sequences merits some attention. No specific budget and programme for uranium exploration are proposed for Cameroon. Instead specific recommendations concerning specific potential environments and general recommendation concerning the methodology of exploration are made. (author)

  16. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Ghana

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) Mission to Ghana. The IUREP Orientation Phase Mission to Ghana estimates that the Speculative Resources of that country fall within the range of 15 000 to 40 000 tonnes of uranium. The majority of this potential is expected to be located in the Proterozoic Panafrican Mobile Belt (up to 17 000 tonnes uranium) and the Paleozoic Obosum Beds of the Voltaian basin (up to 15 000 tonnes uranium), the remainder being associated with various other geological environments. The mission recommends that over a period of three (3) years approximately U.S. $5 million) would be spent on exploration in Ghana. A major part of this (U.S $2 million) would be spent on an airborne spectrometer survey over the Voltaian basin (Obosum beds), much of the remainder being spent on ground surveys, trenching and percussion drilling. (author)

  17. Grey Guide: A Community Driven Open Resource Project in Grey Literature

    Biagioni, Stefania; Giannini, Silvia

    2017-01-01

    In December 2013, the GreyGuide Project was formerly launched as an online forum and repository of good practice in grey literature. The GreyGuide manages Open Source Repositories and provides a unique resource in the field of grey literature that is long awaited and which responds to the information needs of a diverse, international grey literature community. As GreyNet's web access Portal, the GreyGuide now provides a wealth of content that was previously either confined to web pages or was...

  18. An Adaptive Large Neighborhood Search Algorithm for the Resource-constrained Project Scheduling Problem

    Muller, Laurent Flindt

    2009-01-01

    We present an application of an Adaptive Large Neighborhood Search (ALNS) algorithm to the Resource-constrained Project Scheduling Problem (RCPSP). The ALNS framework was first proposed by Pisinger and Røpke [19] and can be described as a large neighborhood search algorithm with an adaptive layer......, where a set of destroy/repair neighborhoods compete to modify the current solution in each iteration of the algorithm. Experiments are performed on the wellknown J30, J60 and J120 benchmark instances, which show that the proposed algorithm is competitive and confirms the strength of the ALNS framework...

  19. The ATLAS Computing Agora: a resource web site for citizen science projects

    Bourdarios, Claire; The ATLAS collaboration

    2016-01-01

    The ATLAS collaboration has recently setup a number of citizen science projects which have a strong IT component and could not have been envisaged without the growth of general public computing resources and network connectivity: event simulation through volunteer computing, algorithms improvement via Machine Learning challenges, event display analysis on citizen science platforms, use of open data, etc. Most of the interactions with volunteers are handled through message boards, but specific outreach material was also developed, giving an enhanced visibility to the ATLAS software and computing techniques, challenges and community. In this talk the Atlas Computing Agora (ACA) web platform will be presented as well as some of the specific material developed for some of the projects.

  20. Resources and Operations Section

    Burgess, R.L.

    1978-01-01

    Progress is reported on the data resources group with regard to numeric information support; IBP data center; and geoecology project. Systems ecology studies consisted of nonlinear analysis-time delays in a host-parasite model; dispersal of seeds by animals; three-dimensional computer graphics in ecology; spatial heterogeneity in ecosystems; and analysis of forest structure. Progress is also reported on the national inventory of biological monitoring programs; ecological sciences information center; and educational activities

  1. Idiosyncratic responses of grizzly bear habitat to climate change based on projected food resource changes.

    Roberts, David R; Nielsen, Scott E; Stenhouse, Gordon B

    2014-07-01

    Climate change vulnerability assessments for species of conservation concern often use species distribution and ecological niche modeling to project changes in habitat. One of many assumptions of these approaches is that food web dependencies are consistent in time and environmental space. Species at higher trophic levels that rely on the availability of species at lower trophic levels as food may be sensitive to extinction cascades initiated by changes in the habitat of key food resources. Here we assess climate change vulnerability for Ursus arctos (grizzly bears) in the southern Canadian Rocky Mountains using projected changes to 17 of the most commonly consumed plant food items. We used presence-absence information from 7088 field plots to estimate ecological niches and to project changes in future distributions of each species. Model projections indicated idiosyncratic responses among food items. Many food items persisted or even increased, although several species were found to be vulnerable based on declines or geographic shifts in suitable habitat. These included Hedysarum alpinum (alpine sweet vetch), a critical spring and autumn root-digging resource when little else is available. Potential habitat loss was also identified for three fruiting species of lower importance to bears: Empetrum nigrum (crowberry), Vaccinium scoparium (grouseberry), and Fragaria virginiana (strawberry). A general trend towards uphill migration of bear foods may result in higher vulnerability to bear populations at low elevations, which are also those that are most likely to have human-bear conflict problems. Regardless, a wide diet breadth of grizzly bears, as well as wide environmental niches of most food items, make climate change a much lower threat to grizzly bears than other bear species such as polar bears and panda bears. We cannot exclude, however, future alterations in human behavior and land use resulting from climate change that may reduce survival rates.

  2. Cost-effectiveness of environmental management for vector control in resource development projects.

    Bos, R

    1991-01-01

    Vector control methods are traditionally divided in chemical, biological and environmental management approaches, and this distinction also reflected in certain financial and economic aspects. This is particularly true for environmental modification, usually engineering or other structural works. It is highly capital intensive, as opposed to chemical and biological control which require recurrent expenditures, and discount rates are therefore a prominent consideration in deciding for one or the other approach. Environmental manipulation requires recurrent action, but can often be carried out with the community participation, which raises the issue of opportunity costs. The incorporation of environmental management in resource projects is generally impeded by economic considerations. The Internal Rate of Return continues to be a crucial criterion for funding agencies and development banks to support new projects; at the same time Governments of debt-riden countries in the Third World will do their best to avoid additional loans on such frills as environmental and health safeguards. Two approaches can be recommended to nevertheless ensure the incorporation of environmental management measures in resource projects in an affordable way. First, there are several examples of cases where environmental management measures either have a dual benefit (increasing both agricultural production and reducing vector-borne disease transmission) or can be implemented at zero costs. Second, the additional costs involved in structural modifications can be separated from the project development costs considered in the calculations of the Internal Rate of Return, and financial support can be sought from bilateral technical cooperation agencies particularly interested in environmental and health issues. There is a dearth of information in the cost-effectiveness of alternative vector control strategies in the developing country context. The process of integrating vector control in the

  3. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Republic of Burundi. Draft

    Gehrisch, W.; Chaigne, M.

    1983-06-01

    The basic objective of the International Uranium Resources Evaluation project lUREP is to 'Review the present body of knowledge pertinent to the existence of uranium resources, to review and evaluate the potential for the discovery of additional uranium resources and to suggest new exploration efforts which might be carried out in promising areas in collaboration with the countries concerned'. Therefore, the scope of the IUREP orientation phase Mission to Burundi was to review all data on past exploration in Burundi, to develop a better understanding of the uranium potential of the country, to make an estimate of the speculative resources of the country, to make recommendation as appropriate on the best methods or techniques for evaluating the resources in the favourable areas and for estimating possible costs as well, to compile a report which could be immediately available to the Burundian authorities. This mission gives a general introduction, a geological review of Burundi, information on non-uranium mining in Burundi, the history of uranium exploration, occurrences of uranium IUREP mission field reconnaissance, favourable areas for speculative potential, the uranium resources position and recommendations for future exploration. Conclusions are the following. The IUREP Orientation -phase mission to Burundi believes that the Speculative Resources of that country fall b etween 300 and 4100 tons uranium oxide but a less speculative appraisal is more likely between 0 and 1000 tons. There has been no uranium production and no official estimates of Uranium Resources in Burundi. Past exploration mainly dating from 1969 onwards and led the UNDP Mineral project has indicated a limited number of uranium occurrences and anomalies. The speculative uranium resources are thought to be possibly associated with potential unconformity related vein-like deposits of the Lower Burundian. Other speculative uranium resources could be associated with granitic or peribatholitic

  4. Offshore Sand Resource Needs, Data Availability and Revaluation, and Beach Nourishment Projects in North Carolina

    Conery, I.; Walsh, J. P.

    2016-12-01

    Storms and sea-level rise continue to impact the dynamic coastlines of North Carolina. Since the coastal region is economically critical to the state and yields numerous ecosystem services, many towns have planned beach nourishment projects. However, offshore sands compatible for nourishment are limited, and project costs fluctuate with borrow source proximity to the shoreline. Hurricane Sandy (2012) caused high water levels and waves resulting in localized overwash and erosion in the northeastern part of NC. In response, to effectively meet the rising nourishment demands for recovery after future storm events and for long-term resiliency, the Bureau of Ocean Energy Management (BOEM) recognized the need to compile and consolidate all geophysical and geologic information in federal waters (3-8 nm) along the East Coast states. A GIS database was created for NC using bathymetric, seismic reflection, sediment and other relevant data from federal, state and private entities. Information will be accessible to the public, coastal planners and managers to allow for informed decision-making and cost-effective project planning. Priority regions for seismic and core collection were determined based on data gaps and needs across the state. In addition, potential sand resource thickness and volume in northeastern NC were revaluated using comparisons of several overlapping datasets. Shoreline volume losses were calculated using long-term erosion rates and compared to historic and future nourishment projects. Finally, tourism-based revenue by town was evaluated and related to short and long-term nourishment costs.

  5. Projections of specialist physicians in Mexico: a key element in planning human resources for health.

    Nigenda, Gustavo; Muños, José Alberto

    2015-09-22

    Projections are considered a useful tool in the planning of human resources for health. In Mexico, the supply and demand of specialist doctors are clearly disconnected, and decisions must be made to reduce labour market imbalances. Thus, it is critical to produce reliable projections to assess future interactions between supply and demand. Using a service demand approach, projections of the number of specialist physicians required by the three main public institutions were calculated using the following variables: a) recent recruitment of specialists, b) physician productivity and c) retirement rates. Two types of scenarios were produced: an inertial one with no changes made to current production levels and an alternative scenario adjusted by recommended productivity levels. Results show that institutions must address productivity as a major policy element to act upon in future contracting of specialist physicians. The projections that adjusted for productivity suggest that the hiring trends for surgeons and internists should be maintained or increased to compensate for the increase in demand for services. In contrast, due to the decline in demand for obstetric and paediatric services, the hiring of new obstetrician-gynaecologists and paediatricians should be reduced to align with future demand.

  6. The Climaware project: Impacts of climate change on water resources management - regional strategies and European view

    Thirel, Guillaume; D'Agostino, Daniela; Démerliac, Stéphane; Dorchies, David; Flörke, Martina; Jay-Allemand, Maxime; Jost, Claudine; Kehr, Katrin; Perrin, Charles; Scardigno, Alessandra; Schneider, Christof; Theobald, Stephan; Träbing, Klaus

    2014-05-01

    Climate projections produced with CMIP5 and applied by the Intergovernmental Panel on Climate Change (IPCC) in its fifth assessment report indicate that changes in precipitation and temperature are expected to occur throughout Europe in the 21th century, with a likely decrease of water availability in many regions. Besides, water demand is also expected to increase, in link with these expected climate modifications, but also due to socio-economic and demographic changes. In this respect, the use of future freshwater resources may not be sustainable from the current water management perspective. Therefore adaptation strategies will most likely be needed to cope with these evolutions. In this context, the main objective of the ClimAware project (2010-2013 - www.uni-kassel.de/fb14/wasserbau/CLIMAWARE/, a project implemented within the IWRM-NET Funding Initiative) was to analyse the impacts of climate change (CC) on freshwater resources at the continental and regional scales and to identify efficient adaptation strategies to improve water management for various socio-economic sectors. This should contribute to a more effective implementation of the Water Framework Directive (WFD) and its instruments (river basin management plans, programmes of measures). The project developed integrated measures for improved freshwater management under CC constraints. More specifically, the objectives of the ClimAware project were to: • elaborate quantitative projections of changes in river flows and consequences such as flood frequency, drought occurrence and sectorial water uses. • analyse the effect of CC on the hydromorphological reference conditions of rivers and therefore the definition of "good status". • define management rules/strategies concerning dam management and irrigation practices on different time perspectives. • investigate uncertainties in climate model - scenario combinations. The research approach considered both European and regional perspectives, to get

  7. Applying inventory classification to a large inventory management system

    Benjamin Isaac May

    2017-06-01

    Full Text Available Inventory classification aims to ensure that business-driving inventory items are efficiently managed in spite of constrained resources. There are numerous single- and multiple-criteria approaches to it. Our objective is to improve resource allocation to focus on items that can lead to high equipment availability. This concern is typical of many service industries such as military logistics, airlines, amusement parks and public works. Our study tests several inventory prioritization techniques and finds that a modified multi-criterion weighted non-linear optimization (WNO technique is a powerful approach for classifying inventory, outperforming traditional techniques of inventory prioritization such as ABC analysis in a variety of performance objectives.

  8. Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Stovall, Stacey H.

    1994-08-01

    The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

  9. Genetic algorithm parameters tuning for resource-constrained project scheduling problem

    Tian, Xingke; Yuan, Shengrui

    2018-04-01

    Project Scheduling Problem (RCPSP) is a kind of important scheduling problem. To achieve a certain optimal goal such as the shortest duration, the smallest cost, the resource balance and so on, it is required to arrange the start and finish of all tasks under the condition of satisfying project timing constraints and resource constraints. In theory, the problem belongs to the NP-hard problem, and the model is abundant. Many combinatorial optimization problems are special cases of RCPSP, such as job shop scheduling, flow shop scheduling and so on. At present, the genetic algorithm (GA) has been used to deal with the classical RCPSP problem and achieved remarkable results. Vast scholars have also studied the improved genetic algorithm for the RCPSP problem, which makes it to solve the RCPSP problem more efficiently and accurately. However, for the selection of the main parameters of the genetic algorithm, there is no parameter optimization in these studies. Generally, we used the empirical method, but it cannot ensure to meet the optimal parameters. In this paper, the problem was carried out, which is the blind selection of parameters in the process of solving the RCPSP problem. We made sampling analysis, the establishment of proxy model and ultimately solved the optimal parameters.

  10. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Bolivia. Draft

    Leroy, Jacques; Mueller-Kahle, Eberhard

    1982-08-01

    The uranium exploration done so far in Bolivia has been carried out by COBOEN, partly with IAEA support, and AGIP S.p.A. of Italy, which between 1974 and 1978 explored four areas in various parts of Bolivia under a production sharing contract with COBOEN. The basic objective of the International Uranium Resources Evaluation Project (IUREP) is to 'review the present body of knowledge pertinent to the existence of uranium resources, to review and evaluate the potential for discovery of additional uranium resources, and to suggest new exploitation efforts which might be carried out in promising areas in collaboration with the country concerned'. Following the initial bibliographic study which formed Phase I of IUREP, it was envisaged that a further assessment in cooperation with, and within, the country concerned would provide a better delineation of areas of high potential and a more reliable estimate as to the degree of favourability for the discovery of additional uranium resources. It was planned that such work would be accomplished through field missions to the country concerned and that these field missions and the resulting report would be known as the Orientation Phase of IUREP. The purpose of the Orientation Phase mission to Bolivia was a) to develop a better understanding of the uranium potential of the country, b) to make an estimate of the Speculative Resources of the country, c) to delineate areas favourable for the discovery of these uranium resources, d) to make recommendations as appropriate on the best methods for evaluating the favourable areas, operating procedures and estimated possible costs, e) to develop the logistical data required to carry out any possible further work, and f) to compile a report which would be immediately available to the Bolivian authorities. The mission reports contains information about a general introduction, non-uranium exploration and mining in Bolivia, manpower in exploration, geological review of Bolivia, past uranium

  11. Project Scheduling Heuristics-Based Standard PSO for Task-Resource Assignment in Heterogeneous Grid

    Ruey-Maw Chen

    2011-01-01

    Full Text Available The task scheduling problem has been widely studied for assigning resources to tasks in heterogeneous grid environment. Effective task scheduling is an important issue for the performance of grid computing. Meanwhile, the task scheduling problem is an NP-complete problem. Hence, this investigation introduces a named “standard“ particle swarm optimization (PSO metaheuristic approach to efficiently solve the task scheduling problems in grid. Meanwhile, two promising heuristics based on multimode project scheduling are proposed to help in solving interesting scheduling problems. They are the best performance resource heuristic and the latest finish time heuristic. These two heuristics applied to the PSO scheme are for speeding up the search of the particle and improving the capability of finding a sound schedule. Moreover, both global communication topology and local ring communication topology are also investigated for efficient study of proposed scheme. Simulation results demonstrate that the proposed approach in this investigation can successfully solve the task-resource assignment problems in grid computing and similar scheduling problems.

  12. Cultural-resource survey report: Hoover Dam Powerplant Modification Project II. Associated transmission-line facility

    Queen, R.L.

    1991-06-01

    The Bureau of Reclamation (Reclamation) is proposing to modify or install additional transmission facilities between the Hoover Dam hydroelectric plant and the Western Area Power Authority substation near Boulder City, Nevada. Reclamation has completed cultural resource investigations to identify historic or prehistoric resources in the project area that might be affected during construction of the transmission line. Four possible transmission corridors approximately 50 feet wide and between 9.5 and 11.5 miles long were investigated. The proposed transmission lines either parallel or replace existing transmission lines. The corridors generally have undergone significant disturbance from past transmission line construction. A Class II sampling survey covering approximately 242 acres was conducted. Access or construction roads have not been identified and surveys of these areas will have to be completed in the future. No historic or prehistoric archeological sites were encountered within the four corridor right-of-ways. It is believed that the probability for prehistoric sites is very low. Four historic period sites were recorded that are outside, but near, the proposed corridor. These sites are not individually eligible for the National Register of Historic Places, but may be associated with the construction of Hoover Dam and contribute to a historic district or multiple property resource area focusing on the dam and its construction

  13. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Morocco

    1985-01-01

    A report has recently been published on the findings of the mission to Morocco under the International Uranium Resources Evaluation Project (IUREP) Orientation Phase. The IUREP Orientation Phase Mission estimates that the speculative resources of Morocco range from 70 000 to 180 000 tonnes of uranium, half of which could be expected to occur in the Northern Provinces, which are relatively well explored, and the other half in the little explored Southern Provinces. In the north, speculative resources are fairly evenly distributed among the various types of deposit, in particular vein deposits (intragranitic and contact) linked with Hercynian and Precambrian blocks, the sandstone type deposits linked with Mesozoic strata and the volcanogenic deposits, especially of Precambrian age. The potential for large high-grade deposits, especially for those linked with unconformities and linear albitites, has been little investigated in Morocco and is chiefly thought to lie in the Precambrian in the Anti-Atlas and Southern Provinces. Here, the presence of acid volcanic rock reinforces the uranium potential, and there is also some potential for calcrete-related deposits. Phosphate-related uranium, to be recovered shortly, constitutes by far the largest reserves in Morocco, estimated at about 7 million tonnes of recoverable uranium. Recommendations have been made for further study of known occurrences and identification of new ones, such as unconformity and albitite-related deposits. (author)

  14. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Morocco

    1985-01-01

    A report has recently been published on the findings of the mission to Morocco under the International Uranium Resources Evaluation Project (IUREP) Orientation Phase. The IUREP Orientation Phase Mission estimates that the speculative resources of Morocco range from 70 000 to 180 000 tonnes of uranium, half of which could be expected to occur in the Northern Provinces, which are relatively well explored, and the other half in the little explored Southern Provinces. In the north, speculative resources are fairly evenly distributed among the various types of deposit, in particular vein deposits (intragranitic and contact) linked with Hercynian and Precambrian blocks, the sandstone type deposits linked with Mesozoic strata and the volcanogenic deposits, especially of Precambrian age. The potential for large high-grade deposits, especially for those linked with unconformities and linear albitites, has been little investigated in Morocco and is chiefly thought to lie in the Precambrian in the Anti-Atlas and Southern Provinces. Here, the presence of acid volcanic rock reinforces the uranium potential, and there is also some potential for calcrete-related deposits. Phosphate-related uranium, to be recovered shortly, constitutes by far the largest reserves in Morocco, estimated at about 7 million tonnes of recoverable uranium. Recommendations have been made for further study of known occurrences and identification of new ones, such as unconformity and albitite-related deposits. (author) [fr

  15. Project CAPTURE: using forest inventory and analysis data to prioritize tree species for conservation, management, and restoration

    Kevin M. Potter; Barbara S. Crane; William W. Hargrove

    2015-01-01

    A variety of threats, most importantly climate change and insect and disease infestation, will increase the likelihood that forest tree species could experience population-level extirpation or species-level extinction during the next century. Project CAPTURE (Conservation Assessment and Prioritization of Forest Trees Under Risk of Extirpation) is a cooperative effort...

  16. Calculating Optimal Inventory Size

    Ruby Perez

    2010-01-01

    Full Text Available The purpose of the project is to find the optimal value for the Economic Order Quantity Model and then use a lean manufacturing Kanban equation to find a numeric value that will minimize the total cost and the inventory size.

  17. 1998 Inventory of Endangered Species and Wildlife Resources at the US Army Kwajalein Atoll, Republic of the Marshall Islands (NODC Accession 0000631)

    National Oceanic and Atmospheric Administration, Department of Commerce — This report summarizes the results of the second United States Army Kwajalein Atoll (USAKA) Activities in the Republic of the Marshall Islands (UES) inventory of...

  18. 1996 Inventory of Endangered Species and Wildlife Resources on US Army Kwajalein Atoll, Republic of the Marshall Islands (NODC Accession 0000251)

    National Oceanic and Atmospheric Administration, Department of Commerce — This report summarizes the results of the first United States Army Kwajalein Atoll (USAKA) Activities in the Republic of the Marshall Islands (UES) inventory of...

  19. Riparian Inventory

    Kansas Data Access and Support Center — This dataset is a digital representation of the 1:24,000 Land Use Riparian Areas Inventory for the state of Kansas. The dataset includes a 100 foot buffer around all...

  20. Report on the CSC project group meeting on alternative energy resources

    1977-11-01

    Under its coordinated R and D programme the Commonwealth Science Council in cooperation with the Ministry of Agriculture, Food and Consumer Affairs, Barbados, organized a meeting to identify suitable projects for inter-country collaboration. Specifically the meeting had three aims: 1. Review present state of activities in alternative energy resources and assess small scale energy needs in the region. 2. Identify specific projects for inter-country collaboration. 3. Draft joint project proposals for such collaboration. A small group of experts (Annex VII) from Britain, Canada, USA and CSC secretariat staff made detailed plans for the Barbados meeting. With a view to assessing real energy needs locally, the Group recommended that a study be undertaken in Barbados prior to the meeting. A report on such a study was presented at the meeting. Member countries were also invited to prepare country papers. In addition, following the planning Group's recommendation, several technical papers were prepared. These covered subjects ranging from conceptual aspects to clarify objectives, assumptions and criteria to a review of all alternative energy technologies

  1. Final environmental statement related to the Plateau Resources Limited Shootering Canyon Uranium Project (Garfield County, Utah)

    1979-07-01

    The proposed action is the issuance of a Source Material License to Plateau Resources, Ltd., for the construction and operation of the proposed Shootering Canyon Uranium Project with a product (U 3 O 8 ) production limited to 2.2 x 10 5 kg (4.9 x 10 5 lb) per year. Impacts to the area from the operation of the Shootering Canyon Uranium Project will include the following: alterations of up to 140 ha (350 acres) that will be occupied by the mill, mill facilities, borrow areas, tailings areas, and roads; an increase in the existing background radiation levels of the mill area as a result of continuous but small releases of uranium, radium, radon, and other, radioactive materials during construction and operation; socioeconomic effects on the local area, particularly the proposed community of Ticaboo, where the majority of workers will be housed during project construction and operation; and production of solid waste material (tailings) from the mill at a rate of about 680 MT (750 tons) per day and deposition as a slurry in an onsite impoundment area; construction and operation of the Shootering Canyon mill will provide employment and induced economic benefits for the region but may also result in some socioeconomic stress. On the basis of the analysis and evaluation set forth in this Environmental Statement, it is proposed that any license issued for the Shootering Canyon mill should be subject to certain conditions for the protection of the environment. A list is included. Nine appendices are also included

  2. 30 CFR 220.032 - Inventories.

    2010-07-01

    ... operations. The accumulation of surplus stocks shall be avoided by proper materiel control, inventory and... physical inventory that has not been credited to NPSL operations under § 220.015(a)(2) shall be credited to... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Inventories. 220.032 Section 220.032 Mineral...

  3. Sustainability-Oriented Financial Resource Allocation in a Project Portfolio through Multi-Criteria Decision-Making

    Nomeda Dobrovolskienė

    2016-05-01

    Full Text Available Modern portfolio theory attempts to maximize the expected return of a portfolio for a given level of portfolio risk, or equivalently minimize risk for a given level of expected return. The reality, however, shows that, when selecting projects to a portfolio and allocating resources in the portfolio, an increasing number of organizations take into account other aspects as well. As a result of the sole purpose (risk-return, it offers only a partial solution for a sustainable organization. Existing project portfolio selection and resource allocation methods and models do not consider sustainability. Therefore, the aim of this article is to develop a sustainability-oriented model of financial resource allocation in a project portfolio by integrating a composite sustainability index of a project into Markowitz’s classical risk-return scheme (mean-variance model. The model was developed by applying multi-criteria decision-making methods. The practicability of the model was tested by an empirical study in a selected construction company. The proposed sustainability-oriented financial resource allocation model could be used in allocating financial resources in any type of business. The use of the model would not only help organisations to manage risk and achieve higher return but would also allow carrying out sustainable projects, thereby promoting greater environmental responsibility and giving more consideration to the wellbeing of future generations. Moreover, the model allows quantifying the impact of the integration of sustainability into financial resource allocation on the return of a portfolio.

  4. A Priority Rule-Based Heuristic for Resource Investment Project Scheduling Problem with Discounted Cash Flows and Tardiness Penalties

    Amir Abbas Najafi

    2009-01-01

    Full Text Available Resource investment problem with discounted cash flows (RIPDCFs is a class of project scheduling problem. In RIPDCF, the availability levels of the resources are considered decision variables, and the goal is to find a schedule such that the net present value of the project cash flows optimizes. In this paper, we consider a new RIPDCF in which tardiness of project is permitted with defined penalty. We mathematically formulated the problem and developed a heuristic method to solve it. The results of the performance analysis of the proposed method show an effective solution approach to the problem.

  5. South Asia river flow projections and their implications for water resources

    Mathison, C.; Wiltshire, A. J.; Falloon, P.; Challinor, A. J.

    2015-06-01

    South Asia is a region with a large and rising population and a high dependance on industries sensitive to water resource such as agriculture. The climate is hugely variable with the region relying on both the Asian Summer Monsoon (ASM) and glaciers for its supply of fresh water. In recent years, changes in the ASM, fears over the rapid retreat of glaciers and the increasing demand for water resources for domestic and industrial use, have caused concern over the reliability of water resources both in the present day and future for this region. The climate of South Asia means it is one of the most irrigated agricultural regions in the world, therefore pressures on water resource affecting the availability of water for irrigation could adversely affect crop yields and therefore food production. In this paper we present the first 25 km resolution regional climate projections of river flow for the South Asia region. ERA-Interim, together with two global climate models (GCMs), which represent the present day processes, particularly the monsoon, reasonably well are downscaled using a regional climate model (RCM) for the periods; 1990-2006 for ERA-Interim and 1960-2100 for the two GCMs. The RCM river flow is routed using a river-routing model to allow analysis of present day and future river flows through comparison with river gauge observations, where available. In this analysis we compare the river flow rate for 12 gauges selected to represent the largest river basins for this region; Ganges, Indus and Brahmaputra basins and characterize the changing conditions from east to west across the Himalayan arc. Observations of precipitation and runoff in this region have large or unknown uncertainties, are short in length or are outside the simulation period, hindering model development and validation designed to improve understanding of the water cycle for this region. In the absence of robust observations for South Asia, a downscaled ERA-Interim RCM simulation provides a

  6. Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North Water Diversion Project

    Jing-chun Feng

    2011-06-01

    Full Text Available Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields.

  7. Travel reliability inventory for Chicago.

    2013-04-01

    The overarching goal of this research project is to enable state DOTs to document and monitor the reliability performance : of their highway networks. To this end, a computer tool, TRIC, was developed to produce travel reliability inventories from : ...

  8. Comparison of the availability of groundwater information sources in Poland with other European countries. Knowledge inventory for hydrogeology research - project KINDRA

    Tomaszewska, Barbara; Dendys, Marta; Tyszer, Magdalena

    2017-11-01

    Regulations of the Water Framework Directive 200/60/EC (WFD) had been applied by European Union countries into their legislation system. However, it does not guarantee that the groundwater research has the same standard and quality in EU countries. KINDRA international research project was launched to assessment of existing groundwater-related practical and scientific knowledge based on a new Hydrogeological Research Classification System (HRC-SYS). This classification is supported by a web-service - the European Inventory of Groundwater Research (EIGR). The main goal of the project is implementation policy of optimization in groundwater research in EU. The preliminary result of survey about groundwater management shows that in Poland is a good state of implementation WFD. Good level of implementation is especially related with groundwater monitoring. It is because a lot of institutions and municipal entities carry out their tasks referring to quality or quantity assessment. Results of their works are published as reports, newsletters, maps, bulletins etc. These materials are potential source of information which can be a valuable contribution to EIGR. However, a lot of information are published only in polish language, so it is impossible to spread this knowledge in Europe.

  9. Comparison of the availability of groundwater information sources in Poland with other European countries. Knowledge inventory for hydrogeology research – project KINDRA

    Tomaszewska Barbara

    2017-01-01

    Full Text Available Regulations of the Water Framework Directive 200/60/EC (WFD had been applied by European Union countries into their legislation system. However, it does not guarantee that the groundwater research has the same standard and quality in EU countries. KINDRA international research project was launched to assessment of existing groundwater-related practical and scientific knowledge based on a new Hydrogeological Research Classification System (HRC-SYS. This classification is supported by a web-service – the European Inventory of Groundwater Research (EIGR. The main goal of the project is implementation policy of optimization in groundwater research in EU. The preliminary result of survey about groundwater management shows that in Poland is a good state of implementation WFD. Good level of implementation is especially related with groundwater monitoring. It is because a lot of institutions and municipal entities carry out their tasks referring to quality or quantity assessment. Results of their works are published as reports, newsletters, maps, bulletins etc. These materials are potential source of information which can be a valuable contribution to EIGR. However, a lot of information are published only in polish language, so it is impossible to spread this knowledge in Europe.

  10. Iowa's Forest Resources in 1999

    Joseph T. II Boykin

    2002-01-01

    The North Central Research Station's Forest Inventory and Analysis Program began fieldwork for the fourth forest inventory of Iowa in 1999. This inventory initiates a new annual inventory system. This Research Note contains preliminary estimates of Iowa's forest resources prepared from data gathered during the first year of the inventory.

  11. City of Flagstaff Project: Ground Water Resource Evaluation, Remote Sensing Component

    Chavez, Pat S.; Velasco, Miguel G.; Bowell, Jo-Ann; Sides, Stuart C.; Gonzalez, Rosendo R.; Soltesz, Deborah L.

    1996-01-01

    Many regions, cities, and towns in the Western United States need new or expanded water resources because of both population growth and increased development. Any tools or data that can help in the evaluation of an area's potential water resources must be considered for this increasingly critical need. Remotely sensed satellite images and subsequent digital image processing have been under-utilized in ground water resource evaluation and exploration. Satellite images can be helpful in detecting and mapping an area's regional structural patterns, including major fracture and fault systems, two important geologic settings for an area's surface to ground water relations. Within the United States Geological Survey's (USGS) Flagstaff Field Center, expertise and capabilities in remote sensing and digital image processing have been developed over the past 25 years through various programs. For the City of Flagstaff project, this expertise and these capabilities were combined with traditional geologic field mapping to help evaluate ground water resources in the Flagstaff area. Various enhancement and manipulation procedures were applied to the digital satellite images; the results, in both digital and hardcopy format, were used for field mapping and analyzing the regional structure. Relative to surface sampling, remotely sensed satellite and airborne images have improved spatial coverage that can help study, map, and monitor the earth surface at local and/or regional scales. Advantages offered by remotely sensed satellite image data include: 1. a synoptic/regional view compared to both aerial photographs and ground sampling, 2. cost effectiveness, 3. high spatial resolution and coverage compared to ground sampling, and 4. relatively high temporal coverage on a long term basis. Remotely sensed images contain both spectral and spatial information. The spectral information provides various properties and characteristics about the surface cover at a given location or pixel

  12. Greenhouse Emission Reductions and Natural Gas Vehicles: A Resource Guide on Technology Options and Project Development

    Orestes Anastasia; NAncy Checklick; Vivianne Couts; Julie Doherty; Jette Findsen; Laura Gehlin; Josh Radoff

    2002-09-01

    that deal with passenger vehicles--and with transportation in general--do not address the climate change component explicitly, and thus there are few GHG reduction goals that are included in these programs. Furthermore, there are relatively few protocols that exist for accounting for the GHG emissions reductions that arise from transportation and, specifically, passenger vehicle projects and programs. These accounting procedures and principles gain increased importance when a project developer wishes to document in a credible manner, the GHG reductions that are achieved by a given project or program. Section four of this paper outlined the GHG emissions associated with NGVs, both upstream and downstream, and section five illustrated the methodology, via hypothetical case studies, for measuring these reductions using different types of baselines. Unlike stationary energy combustion, GHG emissions from transportation activities, including NGV projects, come from dispersed sources creating a need for different methodologies for assessing GHG impacts. This resource guide has outlined the necessary context and background for those parties wishing to evaluate projects and develop programs, policies, projects, and legislation aimed at the promotion of NGVs for GHG emission reduction.

  13. Geotechnical and water resource aspects of uranium mill tailings pile reclamation projects

    Caldwell, J.A.; Tackston, J.W.; Portillo, R.

    1986-01-01

    Design and construction work is currently in progress at more than twenty sites associated with the UMTRA Project - this involves final reclamation of the uranium mill tailings piles so that they are stable for at least 200 years and for up to 1000 years. Remedial action construction plans for the tailings piles involve detailed consideration of the present and possible future ground water and surface-water impacts of the pile. Since the stabilized pile is ultimately a major geotechnical structure, detailed consideration of the long-term resistance to erosion and containment of radioactive material is also required. A case history illustrates how the critical design criteria governing the remedial action activities at the various piles are applied to the pile at the Lakeview site to provide for long-term protection of the water resource and public health and safety

  14. Salt repository project site study plan for water resources: Revision 1

    1987-12-01

    The Site Study Plan for Water Resources describes a field program consisting of surface-water and ground-water characterization. The surface-water studies will determine the drainage basin characteristics (i.e., topography, soils, land use), hydrometeorology, runoff to streams and playas, and surface-water quality (i.e., offsite pollution sources in playa lakes and in streams). The environmental ground-water studies will focus on ground-water quality characterization. The site study plan describes for each study the need for the study, study design, data management and use, schedule of proposed activities, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Projects Requirements Document. 78 refs., 8 figs., 5 tabs

  15. Battery-Powered Electric and Hybrid Electric Vehicle Projects to Reduce Greenhouse Gas Emissions: A Resource for Project Development

    National Energy Technology Laboratory

    2002-07-31

    as requiring specific technology improvements or an increase in fuel efficiency. Site-specific project activities can also be undertaken to help decrease GHG emissions, although the use of such measures is less common. Sample activities include switching to less GHG-intensive vehicle options, such as electric vehicles (EVs) or hybrid electric vehicles (HEVs). As emissions from transportation activities continue to rise, it will be necessary to promote both types of abatement activities in order to reverse the current emissions path. This Resource Guide focuses on site- and project-specific transportation activities. .

  16. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Portugal

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) mission to Portugal. The IUREP Orientation Phase mission to Portugal estimates that the Speculative Resources of that country fall within the range 20,000 to 80,000 tonnes uranium. The majority of this potential is expected to be located in intergranitic vein deposits and in pre-Ordovician schists, but other favourable geological environments include episyenites and Meso-Cainozoic continental sediments. The mission recommends that approximately US$25 million be spent on exploration in Portugal over the next 10 years. The majority of this ($18 million) would be spent on drilling, with a further $7 million on surface surveys and airborne radiometric surveys. It is the opinion of the IUREP Orientation Phase Mission that the considerable funding required for the outlined programme would most suitably be realized by inviting national or foreign commercial organisations to participate in the exploration effort under a partnership or shared production arrangements. (author)

  17. Hydrologic Resources Management Program and Underground Test Area Project FY2005 Progress Report

    Eaton, G F; Genetti, V; Hu, Q; Hudson, G B; Kersting, A B; Lindvall, R E; Moran, J E; Nimz, G J; Ramon, E C; Rose, T P; Shuller, L; Williams, R W; Zavarin, M; Zhao, P

    2007-01-01

    This report describes FY 2005 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains five chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E and E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN)

  18. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Madagascar. September-October 1981

    Meyer, John H.; Brinck, Johan W.

    1981-01-01

    This study, resulting from the IUREP Orientation Mission to Madagascar, includes the reported information on infrastructure, mining regulations and conditions made available to the Mission. Within the structure of the centrally planned economic system, uranium exploration and mining is considered the exclusive activity of OMNIS, an organization founded by the State for that purpose (Office Militaire National pour les Industries Strategiques). Madagascar has a long history of prospection and small-scale exploitation of uranium (thorium and radium). Some of this activity dates back to 1909, culminating in significant production of both uranium and thorium (in excess of 5900 tonnes of uranothorianite) by the CEA and private contractors in the Fort Dauphin area from 1955 to 1968. Past exploration and development work in a number of areas, notably by the CEA, OMNIS and the IAEA/UNDP, is reviewed and the uranium resources and mineral indications reported. The areas rated at present as the more important and which continue to be investigated (by OMNIS, in conjunction with IAEA/UNDP projects) in the order of priority are: the Fort Dauphin area, the Karroo formation and the Neogene lacustrine basin at Antsirabe. The Mission estimates that Madagascar has a moderate potential for undiscovered resources; it is estimated that such speculative resources could lie within the range of 4000 - 38000 tonnes U. In addition there are areas with as yet untested environments and with no known occurrences which may be favourable but which will require prospection. Modifications to existing programmes and new programmes are suggested. Policy alternatives are reviewed

  19. Research of water resources allocation of South-to-North Water Diversion East Route Project in Jiangsu Province ,Eastern China

    Zeng, C.

    2015-12-01

    Optimized allocation of water resources is the important means of solving regional water shortage and can improve the utilization of water resources. Water resources allocation in the large-scale water diversion project area is the current research focus. This research takes the east route of the South-to-North Water Transfer Project in Jiangsu province as the research area, based on the hydrological model, agricultural irrigation quota model, and water project scheduling model, a water resources allocation model was constructed. The research carried on generalized regional water supply network, simulated the water supply, water demand and water deficit in agriculture, industry, life, ecology and lock under the status quo and planning engineering conditions. According to the results, the east route of the South-to-North Water Transfer Project is helpful to improve regional water shortage situation. The results showed that pump output increase by 2.8 billion cubic meters of water. On the conditions of P = 95%, 75% and 50%, compared with the benchmark year, water demand increases slightly due to the need of social and economic development in planning years, and water supply increased significantly because of new diversion ability. Water deficit are greatly reduced by 74.9% especially in the commonly drought condition because of the new project operation and optimized allocation of water resources.

  20. [Resource support as the basis of projects for the prevention of violence and addiction].

    Keupp, Heiner

    2004-10-01

    Lastingly effective projects for the prevention of violence and addiction must ask which resources adolescents require for coping with their lives. A central criteria for a successful life is the creation of coherence in one's inner life and thus the basis for becoming capable of functioning in society. In earlier social eras, the readiness to take on ready-made identity packages was the central criteria for coping with life. Today, this depends on individual adaptation and identity work, and thus the capability for self-organisation, for "intentionality" or "embedding". Children and young people need "free spaces" in their worlds, in order to be able to outline themselves and to act formatively upon their everyday environment. The future prospects of adolescents depend upon their options for learning the "craft of freedom". Sustainable key qualifications for coping with life in globalised, digital capitalism must grasp education as a hard-headed process in which the subject's capacity for self-organisation is to be given optimal encouragement, so that the patchwork of their own identity can succeed as a self-determined creative project.

  1. The Transgenic RNAi Project at Harvard Medical School: Resources and Validation.

    Perkins, Lizabeth A; Holderbaum, Laura; Tao, Rong; Hu, Yanhui; Sopko, Richelle; McCall, Kim; Yang-Zhou, Donghui; Flockhart, Ian; Binari, Richard; Shim, Hye-Seok; Miller, Audrey; Housden, Amy; Foos, Marianna; Randkelv, Sakara; Kelley, Colleen; Namgyal, Pema; Villalta, Christians; Liu, Lu-Ping; Jiang, Xia; Huan-Huan, Qiao; Wang, Xia; Fujiyama, Asao; Toyoda, Atsushi; Ayers, Kathleen; Blum, Allison; Czech, Benjamin; Neumuller, Ralph; Yan, Dong; Cavallaro, Amanda; Hibbard, Karen; Hall, Don; Cooley, Lynn; Hannon, Gregory J; Lehmann, Ruth; Parks, Annette; Mohr, Stephanie E; Ueda, Ryu; Kondo, Shu; Ni, Jian-Quan; Perrimon, Norbert

    2015-11-01

    To facilitate large-scale functional studies in Drosophila, the Drosophila Transgenic RNAi Project (TRiP) at Harvard Medical School (HMS) was established along with several goals: developing efficient vectors for RNAi that work in all tissues, generating a genome-scale collection of RNAi stocks with input from the community, distributing the lines as they are generated through existing stock centers, validating as many lines as possible using RT-qPCR and phenotypic analyses, and developing tools and web resources for identifying RNAi lines and retrieving existing information on their quality. With these goals in mind, here we describe in detail the various tools we developed and the status of the collection, which is currently composed of 11,491 lines and covering 71% of Drosophila genes. Data on the characterization of the lines either by RT-qPCR or phenotype is available on a dedicated website, the RNAi Stock Validation and Phenotypes Project (RSVP, http://www.flyrnai.org/RSVP.html), and stocks are available from three stock centers, the Bloomington Drosophila Stock Center (United States), National Institute of Genetics (Japan), and TsingHua Fly Center (China). Copyright © 2015 by the Genetics Society of America.

  2. The Transgenic RNAi Project at Harvard Medical School: Resources and Validation

    Perkins, Lizabeth A.; Holderbaum, Laura; Tao, Rong; Hu, Yanhui; Sopko, Richelle; McCall, Kim; Yang-Zhou, Donghui; Flockhart, Ian; Binari, Richard; Shim, Hye-Seok; Miller, Audrey; Housden, Amy; Foos, Marianna; Randkelv, Sakara; Kelley, Colleen; Namgyal, Pema; Villalta, Christians; Liu, Lu-Ping; Jiang, Xia; Huan-Huan, Qiao; Wang, Xia; Fujiyama, Asao; Toyoda, Atsushi; Ayers, Kathleen; Blum, Allison; Czech, Benjamin; Neumuller, Ralph; Yan, Dong; Cavallaro, Amanda; Hibbard, Karen; Hall, Don; Cooley, Lynn; Hannon, Gregory J.; Lehmann, Ruth; Parks, Annette; Mohr, Stephanie E.; Ueda, Ryu; Kondo, Shu; Ni, Jian-Quan; Perrimon, Norbert

    2015-01-01

    To facilitate large-scale functional studies in Drosophila, the Drosophila Transgenic RNAi Project (TRiP) at Harvard Medical School (HMS) was established along with several goals: developing efficient vectors for RNAi that work in all tissues, generating a genome-scale collection of RNAi stocks with input from the community, distributing the lines as they are generated through existing stock centers, validating as many lines as possible using RT–qPCR and phenotypic analyses, and developing tools and web resources for identifying RNAi lines and retrieving existing information on their quality. With these goals in mind, here we describe in detail the various tools we developed and the status of the collection, which is currently composed of 11,491 lines and covering 71% of Drosophila genes. Data on the characterization of the lines either by RT–qPCR or phenotype is available on a dedicated website, the RNAi Stock Validation and Phenotypes Project (RSVP, http://www.flyrnai.org/RSVP.html), and stocks are available from three stock centers, the Bloomington Drosophila Stock Center (United States), National Institute of Genetics (Japan), and TsingHua Fly Center (China). PMID:26320097

  3. Interdisciplinarity and Hermeneutics as Pedagogical Resources for the Elaboration of Learning Projects

    Lizbeth Teresa Villamizar Vega

    2017-08-01

    Full Text Available The so-called Learning Projects (AP are considered a methodological strategy conceived in the school and for the school, that must be elaborated in a school year product of a collaborative work between the educative community: students, teachers and managers, but where some teachers Have no clear idea of the linkage they can give to the syllabus contents of the subjects they teach with the learning project, they also do not know that interdisciplinarity and hermeneutics are pedagogical resources that will enable both teachers and students to seek the answer to What does their daily action mean? It is here that the need for a holistic view of the teachers who manage the different curricular units in the technical schools is recognized, where they must search through the APs That the students demonstrate their ability to grant new knowledge, instrumental functionality and usefulness to solve present and future problems that can create critical, reflective, humanistic, liberating and environmental human beings that benefit the community where they are immersed, Where the solution of the problem is solved with the interpretation of the transmitted knowledge, as well as with the new interdisciplinary competences to look for real solutions to real problems.

  4. The US National Resources Defense Council/Soviet Academy of Sciences Nuclear Test Ban Verification Project

    Cochran, T.B.

    1989-01-01

    The first week in September 1987 was an extraordinary one for arms control verification. As part of the co-operative Test Ban Verification Project of the Natural Resources Defense Council (NRDC) and the Soviet Academy of Sciences, fourteen American scientists from the Scripps Institution of Oceanography (at the University of California- San Diego), University of Nevada-Reno and the University of Colorado went to the region of the Soviet's principal nuclear test site near Semipalatinsk. Together with their Soviet counterparts from the Institute of Physics of the Earth (IPE) in Moscow, they fired off three large chemical explosions. The purpose of these explosions was to demonstrate the sensitivity of the three seismic stations surrounding the test site, to study the efficiency with which high-frequency seismic waves propagate in the region, and to study differences between chemical explosions, nuclear explosions and earthquakes in order more firmly to establish procedures for verification of a nuclear test ban. This paper presents a review of the results of these experiments, an update on the status of the joint project, and a review of the significance of high frequency seismic data to test ban verification

  5. NASA In-Situ Resource Utilization (ISRU) Technology and Development Project Overview

    Sanders, Gerald B.; Lason, William E.; Sacksteder, Kurt R.; Mclemore, Carole; Johnson, Kenneth

    2008-01-01

    Since the Vision for Space Exploration (VSE) was released in 2004, NASA, in conjunction with international space agencies, industry, and academia, has continued to define and refine plans for sustained and affordable robotic and human exploration of the Moon and beyond. With the goal of establishing a lunar Outpost on the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, a change in how space exploration is performed is required. One area that opens up the possibility for the first time of breaking our reliance on Earth supplied consumables and learn to live off the land is In-Situ Resource Utilization (ISRU). ISRU, which involves the extraction and processing of space resources into useful products, can have a substantial impact on mission and architecture concepts. In particular, the ability to make propellants, life support consumables, and fuel cell reagents can significantly reduce the cost, mass, and risk of sustained human activities beyond Earth. However, ISRU is an unproven capability for human lunar exploration and can not be put in the critical path of lunar Outpost success until it has been proven. Therefore, ISRU development and deployment needs to take incremental steps toward the desired end state. To ensure ISRU capabilities are available for pre-Outpost and Outpost deployment by 2020, and mission and architecture planners are confident that ISRU can meet initial and long term mission requirements, the ISRU Project is developing technologies and systems in three critical areas: (1) Regolith Excavation, Handling and Material Transportation; (2) Oxygen Extraction from Regolith; and (3) Volatile Extraction and Resource Prospecting, and in four development stages: (I) Demonstrate feasibility; (II) Evolve system w/ improved technologies; (III) Develop one or more systems to TRL 6 before start of flight development; and (IV) Flight development for

  6. Crew Resource Management (CRM video storytelling project: a team-based learning activity

    Ma, Maggie Jiao

    2011-01-01

    Full Text Available This Crew Resource Management (CRM video storytelling project asks students to work in a team (4-5 people per team to create (write and produce a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management. The activity is composed of two parts: (1 creating a video story of CRM in aviation, and (2 delivering a group presentation. Each tem creates a 5-8 minute long video clip of its story. The story must be originally created by the team to educate pilot and/or aviation management students on good practices of CRM in aviation. Accidents and incidents can be used as a reference to inspire ideas. However, this project is not to re-create any previous CRM accidents/incidents. The video story needs to be self-contained and address two or more aspects of CRM specified in the Federal Aviation Administration’s Advisory Circular 120-51. The presentation must include the use of PowerPoint or similar software and additional multimedia visual aids. The presentation itself will last no more than 17 minutes in length; including the actual video story (each group has additional 3 minutes to set up prior to the presentation. During the presentation following the video each team will discuss the CRM problems (or invite audience to identify CRM problems and explain what CRM practices were performed, and should have been performed. This presentation also should describe how each team worked together in order to complete this project (i. e. , good and bad CRM practiced

  7. Phase I Water Rental Pilot Project : Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Riggin, Stacey H.; Hansen, H. Jerome

    1992-10-01

    The Idaho Water Rental Pilot Project was implemented as a part of the Non-Treaty Storage Fish and Wildlife Agreement (NTSA) between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to improve juvenile and adult salmon and steelhead passage in the lower Snake River with the use of rented water for flow augmentation. The primary purpose of this project is to summarize existing resource information and provide recommendations to protect or enhance resident fish and wildlife resources in Idaho with actions achieving flow augmentation for anadromous fish. Potential impacts of an annual flow augmentation program on Idaho reservoirs and streams are modeled. Potential sources of water for flow augmentation and operational or institutional constraints to the use of that water are identified. This report does not advocate flow augmentation as the preferred long-term recovery action for salmon. The state of Idaho strongly believes that annual drawdown of the four lower Snake reservoirs is critical to the long-term enhancement and recovery of salmon (Andrus 1990). Existing water level management includes balancing the needs of hydropower production, irrigated agriculture, municipalities and industries with fish, wildlife and recreation. Reservoir minimum pool maintenance, water quality and instream flows are issues of public concern that will be directly affected by the timing and quantity of water rental releases for salmon flow augmentation, The potential of renting water from Idaho rental pools for salmon flow augmentation is complicated by institutional impediments, competition from other water users, and dry year shortages. Water rental will contribute to a reduction in carryover storage in a series of dry years when salmon flow augmentation is most critical. Such a reduction in carryover can have negative impacts on reservoir fisheries by eliminating shoreline spawning beds, reducing available fish habitat

  8. Projecting changes in the distribution and productivity of living marine resources: A critical review of the suite of modelling approaches used in the large European project VECTORS

    Peck, Myron A.; Arvanitidis, Christos; Butenschön, Momme; Canu, Donata Melaku; Chatzinikolaou, Eva; Cucco, Andrea; Domenici, Paolo; Fernandes, Jose A.; Gasche, Loic; Huebert, Klaus B.; Hufnagl, Marc; Jones, Miranda C.; Kempf, Alexander; Keyl, Friedemann; Maar, Marie; Mahévas, Stéphanie; Marchal, Paul; Nicolas, Delphine; Pinnegar, John K.; Rivot, Etienne; Rochette, Sébastien; Sell, Anne F.; Sinerchia, Matteo; Solidoro, Cosimo; Somerfield, Paul J.; Teal, Lorna R.; Travers-trolet, Morgan; De Wolfshaar, Van Karen E.

    2018-01-01

    We review and compare four broad categories of spatially-explicit modelling approaches currently used to understand and project changes in the distribution and productivity of living marine resources including: 1) statistical species distribution models, 2) physiology-based, biophysical models of

  9. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Peru. August - October 1981

    Hetland, Donald L.; Michie, Uisdean McL.

    1981-01-01

    The IUREP Orientation Phase Mission to Peru believes that the Speculative Resources of that country fall between 6,000 and 11,000 tonnes uranium. There has been no uranium production in Peru and there are no official estimates of uranium resources. Past exploration in Peru (dating from about 1952) has indicated a paucity of valid uranium occurrences and radioactive anomalies. Only recently (1980) have anomalous areas been identified, (Macusani-Picotani). The identified Speculative Resources are mainly in Late Tertiary ignimbrites and associated sediments in the high Andes of southern Peru. Geologically, there are direct parallels between these resources and deposits of the Los Frailes areas of neighbouring Bolivia. Other minor Speculative Resources may be present in calcretes developed from Tertiary volcanogenic sources over the Precambrian in the Pacific Coastal desert of southern Peru but no positive indications have been recognised. Hercynian sub-volcanic granites in the eastern cordillera of southern Peru may have some associated Speculative Resources both intra and extra granitic. No Speculative Potential could be identified in Permo-Triassic or Tertiary post tectonic continental sediments anywhere in Peru. Such potential may exist but further reconnaissance of the continental late Tertiary basins, with positive indications would be required before inclusion of potential in this category. Recent discoveries in the volcanogenic environment of southern Peru have been by carborne, helicopter borne and on on-foot reconnaissance of isolated areas. It is recommended that there be a more systematic, integrated study of the entire volcanic district assisted by volcanic petrographic examination. Assessment of the known occurrences requires immediate subsurface study by drilling and exploration audits to assess their continuity, grade variation and thickness. This phase will be significantly more expensive than previous exploration. Non-core drilling should supplement

  10. A Resource for Eliciting Student Alternative Conceptions: Examining the Adaptability of a Concept Inventory for Natural Selection at the Secondary School Level

    Lucero, Margaret M.; Petrosino, Anthony J.

    2017-01-01

    The Conceptual Inventory of Natural Selection (CINS) is an example of a research-based instrument that assesses conceptual understanding in an area that contains well-documented alternative conceptions. Much of the CINS's use and original validation has been relegated to undergraduate settings, but the information learned from student responses on…

  11. Groundwater well inventory and assessment in the area of the proposed Normally Pressured Lance natural gas development project, Green River Basin, Wyoming, 2012

    Sweat, Michael J.

    2013-01-01

    During May through September 2012, the U.S. Geological Survey, in cooperation with the Bureau of Land Management, inventoried and assessed existing water wells in southwestern Wyoming for inclusion in a possible groundwater-monitor network. Records were located for 3,282 wells in the upper Green River Basin, which includes the U.S. Geological Survey study area and the proposed Normally Pressured Lance natural gas development project area. Records for 2,713 upper Green River Basin wells were determined to be unique (not duplicated) and to have a Wyoming State Engineers Office permit. Further, 376 of these wells were within the U.S. Geological Survey Normally Pressured Lance study area. Of the 376 wells in the U.S. Geological Survey Normally Pressured Lance study area, 141 well records had sufficient documentation, such as well depth, open interval, geologic log, and depth to water, to meet many, but not always all, established monitor well criteria. Efforts were made to locate each of the 141 wells and to document their current condition. Field crews were able to locate 121 of the wells, and the remaining 20 wells either were not located as described, or had been abandoned and the site reclaimed. Of the 121 wells located, 92 were found to meet established monitor well criteria. Results of the field efforts during May through September 2012, and specific physical characteristics of the 92 wells, are presented in this report.

  12. Next generation of human resources for GEN (Generation) III+ new build projects

    Baltin, Goerge; Glaubrecht, Stefan; Schoenfelder, Christian

    2014-01-01

    requires a wide spread approach, involving important stakeholders in this field, such as nuclear operators, nuclear suppliers, academic institutions and political institutions. The specific approach will vary from one country to another and will depend on various factors, e.g. the objectives of the national nuclear program, the existing nuclear infrastructure (if any, e.g. legal framework, educational institutions), the existence (and possibly maturity) of a nuclear industry, the selected GEN III+ technology and the related local supply chain, as well as the integration of national institutions into international networks. The paper provides a systematic overview of the dimensions to be considered as well as the various options and development paths available, and the factors determining the selection process for a specific national approach fusing the efforts of authorities, utilities, education providers and industry. The commitment of industry is illustrated by presenting some examples from recent activities in which AREVA is involved, such as partnerships with academic institutions in Germany, Poland, or Slovakia. Furthermore, as international networks will play an increasingly important role for human resources development, AREVA's participation in international educational associations like ENEN (European Nuclear Education Network), or in international projects, e.g. those funded by the European Commission, is covered. This is assisted by AREVA's involvement in implementing a new methodology for training and job taxonomy (ECVET), supporting life-long learning and international mobility. Finally the paper draws some conclusions on different approaches, and provides some recommendations for future human resources development activities. (authors)

  13. Radiotherapy infrastructure and human resources in Switzerland : Present status and projected computations for 2020.

    Datta, Niloy Ranjan; Khan, Shaka; Marder, Dietmar; Zwahlen, Daniel; Bodis, Stephan

    2016-09-01

    The purpose of this study was to evaluate the present status of radiotherapy infrastructure and human resources in Switzerland and compute projections for 2020. The European Society of Therapeutic Radiation Oncology "Quantification of Radiation Therapy Infrastructure and Staffing" guidelines (ESTRO-QUARTS) and those of the International Atomic Energy Agency (IAEA) were applied to estimate the requirements for teleradiotherapy (TRT) units, radiation oncologists (RO), medical physicists (MP) and radiotherapy technologists (RTT). The databases used for computation of the present gap and additional requirements are (a) Global Cancer Incidence, Mortality and Prevalence (GLOBOCAN) for cancer incidence (b) the Directory of Radiotherapy Centres (DIRAC) of the IAEA for existing TRT units (c) human resources from the recent ESTRO "Health Economics in Radiation Oncology" (HERO) survey and (d) radiotherapy utilization (RTU) rates for each tumour site, published by the Ingham Institute for Applied Medical Research (IIAMR). In 2015, 30,999 of 45,903 cancer patients would have required radiotherapy. By 2020, this will have increased to 34,041 of 50,427 cancer patients. Switzerland presently has an adequate number of TRTs, but a deficit of 57 ROs, 14 MPs and 36 RTTs. By 2020, an additional 7 TRTs, 72 ROs, 22 MPs and 66 RTTs will be required. In addition, a realistic dynamic model for calculation of staff requirements due to anticipated changes in future radiotherapy practices has been proposed. This model could be tailor-made and individualized for any radiotherapy centre. A 9.8 % increase in radiotherapy requirements is expected for cancer patients over the next 5 years. The present study should assist the stakeholders and health planners in designing an appropriate strategy for meeting future radiotherapy needs for Switzerland.

  14. Radiotherapy infrastructure and human resources in Switzerland. Present status and projected computations for 2020

    Datta, Niloy Ranjan; Khan, Shaka; Marder, Dietmar; Zwahlen, Daniel; Bodis, Stephan

    2016-01-01

    The purpose of this study was to evaluate the present status of radiotherapy infrastructure and human resources in Switzerland and compute projections for 2020. The European Society of Therapeutic Radiation Oncology ''Quantification of Radiation Therapy Infrastructure and Staffing'' guidelines (ESTRO-QUARTS) and those of the International Atomic Energy Agency (IAEA) were applied to estimate the requirements for teleradiotherapy (TRT) units, radiation oncologists (RO), medical physicists (MP) and radiotherapy technologists (RTT). The databases used for computation of the present gap and additional requirements are (a) Global Cancer Incidence, Mortality and Prevalence (GLOBOCAN) for cancer incidence (b) the Directory of Radiotherapy Centres (DIRAC) of the IAEA for existing TRT units (c) human resources from the recent ESTRO ''Health Economics in Radiation Oncology'' (HERO) survey and (d) radiotherapy utilization (RTU) rates for each tumour site, published by the Ingham Institute for Applied Medical Research (IIAMR). In 2015, 30,999 of 45,903 cancer patients would have required radiotherapy. By 2020, this will have increased to 34,041 of 50,427 cancer patients. Switzerland presently has an adequate number of TRTs, but a deficit of 57 ROs, 14 MPs and 36 RTTs. By 2020, an additional 7 TRTs, 72 ROs, 22 MPs and 66 RTTs will be required. In addition, a realistic dynamic model for calculation of staff requirements due to anticipated changes in future radiotherapy practices has been proposed. This model could be tailor-made and individualized for any radiotherapy centre. A 9.8 % increase in radiotherapy requirements is expected for cancer patients over the next 5 years. The present study should assist the stakeholders and health planners in designing an appropriate strategy for meeting future radiotherapy needs for Switzerland. (orig.) [de

  15. RCRA [Resource Conservation and Recovery Act] ground-water monitoring projects for Hanford facilities: Annual progress report for 1988

    Fruland, R.M.; Lundgren, R.E.

    1989-04-01

    This report describes the progress during 1988 of 14 Hanford Site ground-water monitoring projects covering 16 hazardous waste facilities and 1 nonhazardous waste facility (the Solid Waste Landfill). Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act (RCRA) of 1976 and the State of Washington Administrative Code. 21 refs., 23 figs., 8 tabs

  16. National Biological Monitoring Inventory

    Burgess, R.L.

    1979-01-01

    The National Biological Monitoring Inventory, initiated in 1975, currently consists of four computerized data bases and voluminous manual files. MAIN BIOMON contains detailed information on 1,021 projects, while MINI BIOMON provides skeletal data for over 3,000 projects in the 50 states, Puerto Rico, the Virgin Islands, plus a few in Canada and Mexico. BIBLIO BIOMON and DIRECTORY BIOMON complete the computerized data bases. The structure of the system provides for on-line search capabilities to generate details of agency sponsorship, indications of funding levels, taxonomic and geographic coverage, length of program life, managerial focus or emphasis, and condition of the data. Examples of each of these are discussed and illustrated, and potential use of the Inventory in a variety of situations is emphasized

  17. Pastures to Prairies to Pools: An Update on Natural Resource Damages Settlement Projects at the Fernald Preserve - 13198

    Powell, Jane [Fernald Preserve Site Manager, DOE Office of Legacy Management, Harrison, Ohio (United States); Schneider, Tom [Fernald Project Manager, Ohio Environmental Protection Agency, Dayton, Ohio (United States); Hertel, Bill [Project Manager, S.M. Stoller Corporation, Harrison, Ohio (United States); Homer, John [Environmental Scientist, S.M. Stoller Corporation, Harrison, Ohio (United States)

    2013-07-01

    The DOE Office of Legacy Management oversees implementation and monitoring of two ecological restoration projects at the Fernald Preserve, Fernald, Ohio, that are funded through a CERCLA natural resource damage settlement. Planning and implementation of on-property ecological restoration projects is one component of compensation for natural resource injury. The Paddys Run Tributary Project involves creation of vernal pool wetland habitat with adjacent forest restoration. The Triangle Area Project is a mesic tall-grass prairie establishment, similar to other efforts at the Fernald Preserve. The goal of the Fernald Natural Resource Trustees is to establish habitat for Ambystomatid salamander species, as well as grassland birds. Field implementation of these projects was completed in May 2012. Herbaceous cover and woody vegetation survival was determined in August and September 2012. Results show successful establishment of native vegetation. Additional monitoring will be needed to determine whether project goals have been met. As with the rest of the Fernald Preserve, ecological restoration has helped turn a DOE liability into a community asset. (authors)

  18. Pastures to Prairies to Pools: An Update on Natural Resource Damages Settlement Projects at the Fernald Preserve - 13198

    Powell, Jane; Schneider, Tom; Hertel, Bill; Homer, John

    2013-01-01

    The DOE Office of Legacy Management oversees implementation and monitoring of two ecological restoration projects at the Fernald Preserve, Fernald, Ohio, that are funded through a CERCLA natural resource damage settlement. Planning and implementation of on-property ecological restoration projects is one component of compensation for natural resource injury. The Paddys Run Tributary Project involves creation of vernal pool wetland habitat with adjacent forest restoration. The Triangle Area Project is a mesic tall-grass prairie establishment, similar to other efforts at the Fernald Preserve. The goal of the Fernald Natural Resource Trustees is to establish habitat for Ambystomatid salamander species, as well as grassland birds. Field implementation of these projects was completed in May 2012. Herbaceous cover and woody vegetation survival was determined in August and September 2012. Results show successful establishment of native vegetation. Additional monitoring will be needed to determine whether project goals have been met. As with the rest of the Fernald Preserve, ecological restoration has helped turn a DOE liability into a community asset. (authors)

  19. The CDC Hemophilia B mutation project mutation list: a new online resource.

    Li, Tengguo; Miller, Connie H; Payne, Amanda B; Craig Hooper, W

    2013-11-01

    Hemophilia B (HB) is caused by mutations in the human gene F9. The mutation type plays a pivotal role in genetic counseling and prediction of inhibitor development. To help the HB community understand the molecular etiology of HB, we have developed a listing of all F9 mutations that are reported to cause HB based on the literature and existing databases. The Centers for Disease Control and Prevention (CDC) Hemophilia B Mutation Project (CHBMP) mutation list is compiled in an easily accessible format of Microsoft Excel and contains 1083 unique mutations that are reported to cause HB. Each mutation is identified using Human Genome Variation Society (HGVS) nomenclature standards. The mutation types and the predicted changes in amino acids, if applicable, are also provided. Related information including the location of mutation, severity of HB, the presence of inhibitor, and original publication reference are listed as well. Therefore, our mutation list provides an easily accessible resource for genetic counselors and HB researchers to predict inhibitors. The CHBMP mutation list is freely accessible at http://www.cdc.gov/hemophiliamutations.

  20. The Inspiring Science Education project and the resources for HEP analysis by university students

    Fassouliotis, Dimitris; Kourkoumelis, Christine; Vourakis, Stylianos

    2016-01-01

    The Inspiring Science Education outreach project has been running for more than two years, creating a large number of inquiry based educational resources for high-school teachers and students. Its goal is the promotion of science education in schools though new methods built on the inquiry based education techniques, involving large consortia of European partners and implementation of large-scale pilots in schools. Recent hands-on activities, developing and testing the above mentioned innovative applications are reviewed. In general, there is a lack for educational scenaria and laboratory courses earmarked for more advanced, namely university, students. At the University of Athens for the last four years, the HYPATIA on-line event analysis tool has been used as a lab course for fourth year undergraduate physics students, majoring in HEP. Up to now, the course was limited to visual inspection of a few tens of ATLAS events. Recently the course was enriched with additional analysis exercises, which involve large samples of events. The students through a user friendly interface can analyse the samples and optimize the cut selection in order to search for new physics. The implementation of this analysis is described

  1. A HYBRID HEURISTIC ALGORITHM FOR SOLVING THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP

    Juan Carlos Rivera

    Full Text Available The Resource Constrained Project Scheduling Problem (RCPSP is a problem of great interest for the scientific community because it belongs to the class of NP-Hard problems and no methods are known that can solve it accurately in polynomial processing times. For this reason heuristic methods are used to solve it in an efficient way though there is no guarantee that an optimal solution can be obtained. This research presents a hybrid heuristic search algorithm to solve the RCPSP efficiently, combining elements of the heuristic Greedy Randomized Adaptive Search Procedure (GRASP, Scatter Search and Justification. The efficiency obtained is measured taking into account the presence of the new elements added to the GRASP algorithm taken as base: Justification and Scatter Search. The algorithms are evaluated using three data bases of instances of the problem: 480 instances of 30 activities, 480 of 60, and 600 of 120 activities respectively, taken from the library PSPLIB available online. The solutions obtained by the developed algorithm for the instances of 30, 60 and 120 are compared with results obtained by other researchers at international level, where a prominent place is obtained, according to Chen (2011.

  2. Use of the environmental resource management and analysis system at the Fernald Environmental Management Project

    Erjavec, J.L.

    1992-01-01

    In the past, hazardous waste site characterization and remediation using computer-based technologies has been a difficult and time-consuming process because of the need to analyze data using non-interfaced computer and software environments. The Environmental Resource Management and Analysis System (ERMA) was developed as an innovative approach to the management, analyses and depiction of data collected during a hazardous site remediation. A modular, multi-disciplined software package, ERMA integrates an environmental database management system with variety of Geographic Information System technologies. ERMA capabilities include spatial analysis, three-dimensional subsurface geologic interpretation and modeling, terrain modeling, and groundwater flow and contaminant transport modeling. ERMA's data management is provided through a set of user-modifiable, graphic interface tools that permit complex data queries, data modification and reporting. An ERMA prototype has been implemented at the Fernald Environmental Management Project (a Department of Energy cleanup site) using groundwater monitoring and elevation data collected over the last few years. ERMA has enabled the precision posting of data from the 853 groundwater monitoring wells at the site. Data from these wells have ben used to define the piezometric surface of the Great Miami Aquifer and correlate it with the uranium concentration contours of an identified groundwater plume. Using spatial query capabilities, radioactive sampling results from monitoring wells have been compared to contour maps defining the extent of the plume to determine the validity of those maps and the need for additional well locations

  3. Emissions from decentralised CHP plants 2007 - Energinet.dk Environmental project no. 07/1882. Project report 5 - Emission factors and emission inventory for decentralised CHP production

    Nielsen, Malene; Nielsen, Ole-Kenneth; Thomsen, M.

    2010-06-15

    Updated emission factors for decentralised combined heat and power (CHP) plants with a capacity < 25MWe have been estimated based on project emission measurements as well as emission measurements performed in recent years that were collected. The emission factors valid for 2006/2007 have been estimated for the plant technologies: Municipal solid waste (MSW) incineration plants, plants combusting straw or wood, natural gas fuelled reciprocating engines, biogas fuelled engines, natural gas fuelled gas turbines, gas oil fuelled reciprocating engines, gas oil fuelled gas turbines, steam turbines combusting residual oil and reciprocating engines combusting biomass producer gas based on wood. The emission factors for MSW incineration plants are much lower than the emission factors that were estimated for year 2000. The considerable reduction in the emission factors is a result of lower emission limit values in Danish legislation since 2006 that has lead to installation of new and improved flue gas cleaning systems in most MSW incineration plants. For CHP plants combusting wood or straw no major technical improvements have been implemented. The emission factors for natural gas fuelled reciprocating engines have been reduced since year 2000 as a result of technical improvements that have been carried out due to lower emission limit values in Danish legislation. The NO{sub x} emission factor for natural gas fuelled gas turbines has decreased 62 % since year 2000. This is a result of installation of low-NO{sub x} burners in almost all gas turbines that has been necessary to meet new emission limits in Danish legislation. The emission measurements programme included screening of the emissions of HCB, PCB, PCDD/-F and PBDD/-F. Compared to the Danish national emission decentralized CHP plants are major emission sources for CH{sub 4}, NO{sub x}, SO{sub 2}, heavy metals and HCB. (author)

  4. Towards efficient use of research resources: a nationwide database of ongoing primary care research projects in the Netherlands.

    Kortekaas, Marlous F; van de Pol, Alma C; van der Horst, Henriëtte E; Burgers, Jako S; Slort, Willemjan; de Wit, Niek J

    2014-04-01

    PURPOSE. Although in the last decades primary care research has evolved with great success, there is a growing need to prioritize the topics given the limited resources available. Therefore, we constructed a nationwide database of ongoing primary care research projects in the Netherlands, and we assessed if the distribution of research topics matched with primary care practice. We conducted a survey among the main primary care research centres in the Netherlands and gathered details of all ongoing primary care research projects. We classified the projects according to research topic, relation to professional guidelines and knowledge deficits, collaborative partners and funding source. Subsequently, we compared the frequency distribution of clinical topics of research projects to the prevalence of problems in primary care practice. We identified 296 ongoing primary care research projects from 11 research centres. Most projects were designed as randomized controlled trial (35%) or observational cohort (34%), and government funded mostly (60%). Thematically, most research projects addressed chronic diseases, mainly cardiovascular risk management (8%), depressive disorders (8%) and diabetes mellitus (7%). One-fifth of the projects was related to defined knowledge deficits in primary care guidelines. From a clinical primary care perspective, research projects on dermatological problems were significantly underrepresented (P = 0.01). This survey of ongoing projects demonstrates that primary care research has a firm basis in the Netherlands, with a strong focus on chronic disease. The fit with primary care practice can improve, and future research should address knowledge deficits in professional guidelines more.

  5. Research cooperation project on environmentally friendly technology for highly efficient mineral resources extraction and treatment. Detail design for pilot plant

    NONE

    1999-03-01

    Photographs and drawings were edited into a book in relation with a joint project for environment preservation technologies in high-efficiency extraction and treatment of mineral resources, and detail design for a pilot plant. The book classified the related devices into fabricated devices, purchased devices and electrical devices, and contains detailed drawings and photographs thereof. (NEDO)

  6. Next Generation Computer Resources: Reference Model for Project Support Environments (Version 2.0)

    Brown, Alan

    1993-01-01

    The objective of the Next Generation Computer Resources (NGCR) program is to restructure the Navy's approach to acquisition of standard computing resources to take better advantage of commercial advances and investments...

  7. Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources Projects

    Cole, Richard A

    2006-01-01

    ...) when they significantly degrade services provided by water resources. Government agencies, utilities, and other water resource managers incur substantial costs controlling ANS and repairing damage to restore service performance to desired levels...

  8. Optimization of Inventory

    PROKOPOVÁ, Nikola

    2017-01-01

    The subject of this thesis is optimization of inventory in selected organization. Inventory optimization is a very important topic in each organization because it reduces storage costs. At the beginning the inventory theory is presented. It shows the meaning and types of inventory, inventory control and also different methods and models of inventory control. Inventory optimization in the enterprise can be reached by using models of inventory control. In the second part the company on which is...

  9. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Cameroon. Draft

    Trey, Michel de; Leney, George W.

    1983-05-01

    The purpose of the International Uranium Resource Evaluation Project (IUREP) missions to host nations is to: R eview the present body of knowledge pertinent to the existence of uranium resources, to review and evaluate the potential for the discovery of additional resources, and to suggest new exploration efforts which might be carried out in promising areas in collaboration with the countries concerned. Guidance in the achievement of these goals is provided through a check list of desired relevant information on: general background, the potential role of nuclear energy, and organizations involved, information on the mining industry, technical manpower employed or available, available maps, aerial photographs, and publications, national geological survey and organizations involved in uranium, private organizations involved in uranium exploration and mining, results of previous exploration, known uranium occurrences, plans for further work, legal and administrative requirements for exploration and logistical information on facilities available. The economy of CAMEROON is sound and continues to expand with an annual growth rates of 5-6%. Emphasis is placed on private investment with government participation in major development projects. The overall investment climate is good. Minerals exploration is carried out under nonexclusive Prospecting License and exclusive Exploration License that may later be converted to a Mining Lease or Mining Concession. Many of the conditions must be negotiated. Uranium is classified as a strategic mineral, and may be subject to special review. There is no defined policy on uranium development. Two government organizations are concerned with geology and mining. The INSTITUT DE RECHERCHES GEOLOGIQUES ET MINIERES (IRGM) conducts programs of geologic mapping and research, mineralogy, hydrology, and alternate energy sources. The DEPARTMENT OF MINES AND GEOLOGY (DMG) is responsible for all minerals exploration and mining. It includes a

  10. Renewable Resources: a national catalog of model projects. Volume 2. Mid-American Solar Energy Complex Region

    None

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Mid-American Solar Energy Complex Region. (WHK)

  11. Initial Radionuclide Inventories

    H. Miller

    2004-09-19

    The purpose of this analysis is to provide an initial radionuclide inventory (in grams per waste package) and associated uncertainty distributions for use in the Total System Performance Assessment for the License Application (TSPA-LA) in support of the license application for the repository at Yucca Mountain, Nevada. This document is intended for use in postclosure analysis only. Bounding waste stream information and data were collected that capture probable limits. For commercially generated waste, this analysis considers alternative waste stream projections to bound the characteristics of wastes likely to be encountered using arrival scenarios that potentially impact the commercial spent nuclear fuel (CSNF) waste stream. For TSPA-LA, this radionuclide inventory analysis considers U.S. Department of Energy (DOE) high-level radioactive waste (DHLW) glass and two types of spent nuclear fuel (SNF): CSNF and DOE-owned (DSNF). These wastes are placed in two groups of waste packages: the CSNF waste package and the codisposal waste package (CDSP), which are designated to contain DHLW glass and DSNF, or DHLW glass only. The radionuclide inventory for naval SNF is provided separately in the classified ''Naval Nuclear Propulsion Program Technical Support Document'' for the License Application. As noted previously, the radionuclide inventory data presented here is intended only for TSPA-LA postclosure calculations. It is not applicable to preclosure safety calculations. Safe storage, transportation, and ultimate disposal of these wastes require safety analyses to support the design and licensing of repository equipment and facilities. These analyses will require radionuclide inventories to represent the radioactive source term that must be accommodated during handling, storage and disposition of these wastes. This analysis uses the best available information to identify the radionuclide inventory that is expected at the last year of last emplacement

  12. Distribution method optimization : inventory flexibility

    Asipko, D.

    2010-01-01

    This report presents the outcome of the Logistics Design Project carried out for Nike Inc. This project has two goals: create a model to measure a flexibility aspect of the inventory usage in different Nike distribution channels, and analyze opportunities of changing the decision model of splitting

  13. Projecting Future Sea Level Rise for Water Resources Planning in California

    Anderson, J.; Kao, K.; Chung, F.

    2008-12-01

    Sea level rise is one of the major concerns for the management of California's water resources. Higher water levels and salinity intrusion into the Sacramento-San Joaquin Delta could affect water supplies, water quality, levee stability, and aquatic and terrestrial flora and fauna species and their habitat. Over the 20th century, sea levels near San Francisco Bay increased by over 0.6ft. Some tidal gauge and satellite data indicate that rates of sea level rise are accelerating. Sea levels are expected to continue to rise due to increasing air temperatures causing thermal expansion of the ocean and melting of land-based ice such as ice on Greenland and in southeastern Alaska. For water planners, two related questions are raised on the uncertainty of future sea levels. First, what is the expected sea level at a specific point in time in the future, e.g., what is the expected sea level in 2050? Second, what is the expected point of time in the future when sea levels will exceed a certain height, e.g., what is the expected range of time when the sea level rises by one foot? To address these two types of questions, two factors are considered: (1) long term sea level rise trend, and (2) local extreme sea level fluctuations. A two-step approach will be used to develop sea level rise projection guidelines for decision making that takes both of these factors into account. The first step is developing global sea level rise probability distributions for the long term trends. The second step will extend the approach to take into account the effects of local astronomical tides, changes in atmospheric pressure, wind stress, floods, and the El Niño/Southern Oscillation. In this paper, the development of the first step approach is presented. To project the long term sea level rise trend, one option is to extend the current rate of sea level rise into the future. However, since recent data indicate rates of sea level rise are accelerating, methods for estimating sea level rise

  14. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1997

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell

  15. Skills Inventory

    Social Security Administration — Application to assist in 1) determining effects of retirement on IT workforce, 2) resource planning, and 3) understanding training needs. Also attempts to satisfy...

  16. UNIVERSAL MANAGEMENT SYSTEM OF EDUCATIONAL RESOURCES OF THE KHMARA’S SCIENTIFIC RESEARCH PROJECT OF OPEN EDUCATION

    Volodymyr I. Bessarabov

    2013-12-01

    Full Text Available The article is devoted to actual problems of the choice of technological platform and creation of a universal system of management of educational resources. The advantages of cloud technologies of distributed computing compared to server-side technologies for the purpose of creating a universal system of management of educational resources are shown. The choice of the service Google Apps for Education as a technological basis for constructing the system of management of educational resources was substantiated. It is concluded about the high efficiency of cloud technologies for creating the universal system of management of educational resources to integrate education and training on a single technology platform in projects of open education.

  17. A test of the Forest Inventory and Analysis Program’s down woody material indicator for regional fuel estimation in the Southern Appalachian Mountains (PROJECT SO-F-06-01)

    G. Geof Wang; Zhi-Ping Wang; Aaron D. Stottlemyer; Thomas A. Waldrop

    2013-01-01

    Both the National Fire Plan (http://199.134.225.50/nwcc/t2_wa4/ pdf/RuralAssistance.pdf) and the Healthy Forest Initiative (http://www.fs.fed.us/projects/ hfi/2003/august/documents/hfi-fact-sheet. pdf) call for reduction of hazardous fuels. Consequently, estimations of forest fuel loading at various scales become necessary. The Forest Inventory and Analysis (FIA)...

  18. Integration of surface and groundwater resources for the development of Hamad Basin project

    Rofail, Nabil; Asaad, S. I.

    1989-11-01

    Hamad Basin (166,000 km2) is an extensive basin, inhabited by 219,000 souls. It is located in the arid region within the border of four Arab States: Syria, Jordan, Iraq, and Saudi Arabia. Average annual precipitation depth is 78 mm, falling mostly during winter. Integrated studies of the natural resources, (water, soil, range, and animal) were carried out with other complementary studies to formulate a socioeconomic development plan for the promissing areas within the basin. Modern technologies were applied such as remote sensing, isotope analysis, processing, and documenting of basic hydrogeological data within the data bank system using computer facilities. Results revealed that the output of the natural dry plant production amounts to 2.0 × 106 tons. Animal wealth comprise 2 × 106 head mainly of sheep. Average annual surface runoff is 146 × 106 m3, which could be appropriately exploited in water spreading schemes to improve range. Water lost presently through evaporation from vast flat depression (Khabra) could be conserved through deepening the Khabras, and recharging shallow perched aquifer by surface runoff, which could be mined later. Results of regional geology, partial geophysical studies, and hydrogeological, hydrochemical interpretations have concuded the existance of two main aquifer systems, the first lies within the tertiary and quaternary formations, while the second extends to the mesozoic, and paleozoic. Their yield varies quantitively and qualitively, up to 100 × 106 m3 could be safely drawn annually. One compound pilot project was selected within the sector of each of the four Arab States to test the feasibility of the proposed development program for the promissing areas of the basin.

  19. Inventory Abstraction

    Leigh, C.

    2000-01-01

    The purpose of the inventory abstraction as directed by the development plan (CRWMS M and O 1999b) is to: (1) Interpret the results of a series of relative dose calculations (CRWMS M and O 1999c, 1999d). (2) Recommend, including a basis thereof, a set of radionuclides that should be modeled in the Total System Performance Assessment in Support of the Site Recommendation (TSPA-SR) and the Total System Performance Assessment in Support of the Final Environmental Impact Statement (TSPA-FEIS). (3) Provide initial radionuclide inventories for the TSPA-SR and TSPA-FEIS models. (4) Answer the U.S. Nuclear Regulatory Commission (NRC)'s Issue Resolution Status Report ''Key Technical Issue: Container Life and Source Term'' (CLST IRSR) (NRC 1999) key technical issue (KTI): ''The rate at which radionuclides in SNF [Spent Nuclear Fuel] are released from the EBS [Engineered Barrier System] through the oxidation and dissolution of spent fuel'' (Subissue 3). The scope of the radionuclide screening analysis encompasses the period from 100 years to 10,000 years after the potential repository at Yucca Mountain is sealed for scenarios involving the breach of a waste package and subsequent degradation of the waste form as required for the TSPA-SR calculations. By extending the time period considered to one million years after repository closure, recommendations are made for the TSPA-FEIS. The waste forms included in the inventory abstraction are Commercial Spent Nuclear Fuel (CSNF), DOE Spent Nuclear Fuel (DSNF), High-Level Waste (HLW), naval Spent Nuclear Fuel (SNF), and U.S. Department of Energy (DOE) plutonium waste. The intended use of this analysis is in TSPA-SR and TSPA-FEIS. Based on the recommendations made here, models for release, transport, and possibly exposure will be developed for the isotopes that would be the highest contributors to the dose given a release to the accessible environment. The inventory abstraction is important in assessing system performance because

  20. INVENTORY ABSTRACTION

    Ragan, G.

    2001-01-01

    The purpose of the inventory abstraction, which has been prepared in accordance with a technical work plan (CRWMS M andO 2000e for/ICN--02 of the present analysis, and BSC 2001e for ICN 03 of the present analysis), is to: (1) Interpret the results of a series of relative dose calculations (CRWMS M andO 2000c, 2000f). (2) Recommend, including a basis thereof, a set of radionuclides that should be modeled in the Total System Performance Assessment in Support of the Site Recommendation (TSPA-SR) and the Total System Performance Assessment in Support of the Final Environmental Impact Statement (TSPA-FEIS). (3) Provide initial radionuclide inventories for the TSPA-SR and TSPA-FEIS models. (4) Answer the U.S. Nuclear Regulatory Commission (NRC)'s Issue Resolution Status Report ''Key Technical Issue: Container Life and Source Term'' (CLST IRSR) key technical issue (KTI): ''The rate at which radionuclides in SNF [spent nuclear fuel] are released from the EBS [engineered barrier system] through the oxidation and dissolution of spent fuel'' (NRC 1999, Subissue 3). The scope of the radionuclide screening analysis encompasses the period from 100 years to 10,000 years after the potential repository at Yucca Mountain is sealed for scenarios involving the breach of a waste package and subsequent degradation of the waste form as required for the TSPA-SR calculations. By extending the time period considered to one million years after repository closure, recommendations are made for the TSPA-FEIS. The waste forms included in the inventory abstraction are Commercial Spent Nuclear Fuel (CSNF), DOE Spent Nuclear Fuel (DSNF), High-Level Waste (HLW), naval Spent Nuclear Fuel (SNF), and U.S. Department of Energy (DOE) plutonium waste. The intended use of this analysis is in TSPA-SR and TSPA-FEIS. Based on the recommendations made here, models for release, transport, and possibly exposure will be developed for the isotopes that would be the highest contributors to the dose given a release

  1. Ecological Footprint of Biological Resource Consumption in a Typical Area of the Green for Grain Project in Northwestern China

    Jie Hu

    2015-01-01

    Full Text Available Following the implementation of the Green for Grain Project in 2000 in Guyuan, China, the decrease in cultivated land and subsequent increase in forest and grassland pose substantial challenges for the supply of biological products. Whether the current biologically productive land-use patterns in Guyuan satisfy the biological product requirements for local people is an urgent problem. In this study, the ecological footprints of biological resource consumption in Guyuan were calculated and analyzed based on the ‘City Hectare’ Ecological Footprint (EF Method. The EFs of different types of biological resource products consumed from different types of biologically productive land were then analyzed. In addition, the EFs of various biological resource products before and after the implementation of the Green for Grain Project (1998 and 2012 were assessed. The actual EF and bio-capacity (BC were compared, and differences in the EF and BC for different types of biologically productive lands before and after the project were analyzed. The results showed that the EF of Guyuan’s biological resource products was 0.65866 ha/cap, with an EF outflow and EF inflow of 0.2280 ha/cap and 0.0951 ha/cap, respectively. The per capita EF of Guyuan significantly decreased after the project, as did the ecological deficit. Whereas the cultivated land showed a deficit, grasslands were characterized by ecological surplus. The total EF of living resource consumption in Guyuan was 810,941 ha, and the total BC was 768,065 ha. In additional to current biological production areas, approximately 42,876 ha will be needed to satisfy the demands of Guyuan’s people. Cultivated land is the main type of biologically productive land that is needed.

  2. 75 FR 48365 - Solicitation for a Cooperative Agreement-NIC Cost Containment Online Resource Center Project

    2010-08-10

    ..., or design aspects proposed that will enhance the project? Organizational (35%) Does the proposed..., organization, individual or team have the organizational capacity to complete the project tasks? Are the... there a reasonable justification for their inclusion in the project and a clear structure to ensure...

  3. Vermont's Forest Resources, 2006

    R.S. Morin; R. De Geus

    2008-01-01

    This publication provides an overview of forest resource attributes for Vermont based on an annual inventory conducted by the Forest Inventory and Analysis (FIA) program at the Northern Research Station of the U.S. Forest Service. These annual estimates, along with web-posted core tables, will be updated annually. For more information regarding past inventory reports...

  4. Wisconsin's forest resources, 2005

    Charles, H. (Hobie) Perry; Gary J. Brand

    2006-01-01

    The annual forest inventory of Wisconsin continues, and this document reports 2001-05 moving averages for most variables and comparisons between 2000 and 2005 for growth, removals, and mortality. Summary resource tables can be generated through the Forest Inventory Mapmaker website at http://ncrs2.fs.fed.us/4801/fiadb/index. htm. Estimates from this inventory show a...

  5. Projecting water resources changes in potential large-scale agricultural investment areas of the Kafue River Basin in Zambia

    Kim, Y.; Trainor, A. M.; Baker, T. J.

    2017-12-01

    Climate change impacts regional water availability through the spatial and temporal redistribution of available water resources. This study focuses on understanding possible response of water resources to climate change in regions where potentials for large-scale agricultural investments are planned in the upper and middle Kafue River Basin in Zambia. We used historical and projected precipitation and temperature to assess changes in water yield, using the Soil and Water Assessment Tool (SWAT) hydrological model. Some of the Coupled Model Intercomparison Project Phase 5 (CMIP5) climate model outputs for the Representative Concentration Pathway (RCP) 4.5 and 8.5 scenarios project a temperature warming range from 1.8 - 5.7 °C over the region from 2020 to 2095. Precipitation projection patterns vary monthly but tend toward drier dry seasons with a slight increase in precipitation during the rainy season as compared to the historical time series. The best five calibrated parameter sets generated for the historical record (1965 - 2005) were applied for two future periods, 2020 - 2060 and 2055 - 2095, to project water yield change. Simulations projected that the 90th percentile water yield would be exceeded across most of the study area by up to 800% under the medium-low (RCP4.5) CO2 emission scenario, whereas the high (RCP8.5) CO2 emission scenario resulted in a more spatially varied pattern mixed with increasing (up to 500%) and decreasing (up to -54%) trends. The 10th percentile water yield indicated spatially varied pattern across the basin, increasing by as much as 500% though decreasing in some areas by 66%, with the greatest decreases during the dry season under RCP8.5. Overall, available water resources in the study area are projected to trend toward increased floods (i.e. water yields far exceeding 90th percentile) as well as increasing drought (i.e. water yield far below 10th percentile) vulnerability. Because surface water is a primary source for agriculture

  6. The nuclide inventory in SFR-1

    Ingemansson, Tor

    2001-10-01

    This report is an account for a project carried out on behalf of the Swedish Radiation Protection Authority (SSI): 'Nuclide inventory in SFR-1' (The Swedish underground disposal facility for low and intermediate level reactor waste). The project comprises the following five sub-projects: 1) Measuring methods for nuclides, difficult to measure, 2) The nuclide inventory in SFR-1, 3) Proposal for nuclide library for SFR-1 and ground disposal, 4) Nuclide library for exemption, and 5) Characterising of the nuclide inventory and documentation for SFL waste. In all five sub-projects long-lived activity, including Cl-36, has been considered

  7. Leadership Development of Rehabilitation Professionals in a Low-Resource Country: A Transformational Leadership, Project-Based Model.

    Pascal, Maureen Romanow; Mann, Monika; Dunleavy, Kim; Chevan, Julia; Kirenga, Liliane; Nuhu, Assuman

    2017-01-01

    This paper presents an overview of the activities and outcomes of the Leadership Institute (LI), a short-term leadership development professional development course offered to physiotherapists in a low-resource country. Previous studies have provided examples of the benefits of such programs in medicine and nursing, but this has yet to be documented in the rehabilitation literature. The prototype of leadership development presented may provide guidance for similar trainings in other low-resource countries and offer the rehabilitation community an opportunity to build on the model to construct a research agenda around rehabilitation leadership development. The course used a constructivist approach to integrate participants' experiences, background, beliefs, and prior knowledge into the content. Transformational leadership development theory was emphasized with the generation of active learning projects, a key component of the training. Positive changes after the course included an increase in the number of community outreach activities completed by participants and increased involvement with their professional organization. Thirteen leadership projects were proposed and presented. The LI provided present and future leaders throughout Rwanda with exposure to transformative leadership concepts and offered them the opportunity to work together on projects that enhanced their profession and met the needs of underserved communities. Challenges included limited funding for physiotherapy positions allocated to hospitals in Rwanda, particularly in the rural areas. Participants experienced difficulties in carrying out leadership projects without additional funding to support them. While the emphasis on group projects to foster local advocacy and community education is highly recommended, the projects would benefit from a strong long-term mentorship program and further budgeting considerations. The LI can serve as a model to develop leadership skills and spur professional

  8. Radiotherapy infrastructure and human resources in Switzerland. Present status and projected computations for 2020

    Datta, Niloy Ranjan; Khan, Shaka; Marder, Dietmar [KSA-KSB, Kantonsspital Aarau, RadioOnkologieZentrum, Aarau (Switzerland); Zwahlen, Daniel [Kantonsspital Graubuenden, Department of Radiotherapy, Chur (Switzerland); Bodis, Stephan [KSA-KSB, Kantonsspital Aarau, RadioOnkologieZentrum, Aarau (Switzerland); University Hospital Zurich, Department of Radiation Oncology, Zurich (Switzerland)

    2016-09-15

    The purpose of this study was to evaluate the present status of radiotherapy infrastructure and human resources in Switzerland and compute projections for 2020. The European Society of Therapeutic Radiation Oncology ''Quantification of Radiation Therapy Infrastructure and Staffing'' guidelines (ESTRO-QUARTS) and those of the International Atomic Energy Agency (IAEA) were applied to estimate the requirements for teleradiotherapy (TRT) units, radiation oncologists (RO), medical physicists (MP) and radiotherapy technologists (RTT). The databases used for computation of the present gap and additional requirements are (a) Global Cancer Incidence, Mortality and Prevalence (GLOBOCAN) for cancer incidence (b) the Directory of Radiotherapy Centres (DIRAC) of the IAEA for existing TRT units (c) human resources from the recent ESTRO ''Health Economics in Radiation Oncology'' (HERO) survey and (d) radiotherapy utilization (RTU) rates for each tumour site, published by the Ingham Institute for Applied Medical Research (IIAMR). In 2015, 30,999 of 45,903 cancer patients would have required radiotherapy. By 2020, this will have increased to 34,041 of 50,427 cancer patients. Switzerland presently has an adequate number of TRTs, but a deficit of 57 ROs, 14 MPs and 36 RTTs. By 2020, an additional 7 TRTs, 72 ROs, 22 MPs and 66 RTTs will be required. In addition, a realistic dynamic model for calculation of staff requirements due to anticipated changes in future radiotherapy practices has been proposed. This model could be tailor-made and individualized for any radiotherapy centre. A 9.8 % increase in radiotherapy requirements is expected for cancer patients over the next 5 years. The present study should assist the stakeholders and health planners in designing an appropriate strategy for meeting future radiotherapy needs for Switzerland. (orig.) [German] Ziel dieser Studie war es, den aktuellen Stand der Infrastruktur und Personalausstattung der

  9. Projecting changes in the distribution and productivity of living marine resources: A critical review of the suite of modelling approaches used in the large European project VECTORS

    Peck, Myron A.; Arvanitidis, Christos; Butenschön, Momme; Canu, Donata Melaku; Chatzinikolaou, Eva; Cucco, Andrea; Domenici, Paolo; Fernandes, Jose A.; Gasche, Loic; Huebert, Klaus B.; Hufnagl, Marc; Jones, Miranda C.; Kempf, Alexander; Keyl, Friedemann; Maar, Marie; Mahévas, Stéphanie; Marchal, Paul; Nicolas, Delphine; Pinnegar, John K.; Rivot, Etienne; Rochette, Sébastien; Sell, Anne F.; Sinerchia, Matteo; Solidoro, Cosimo; Somerfield, Paul J.; Teal, Lorna R.; Travers-Trolet, Morgan; van de Wolfshaar, Karen E.

    2018-02-01

    We review and compare four broad categories of spatially-explicit modelling approaches currently used to understand and project changes in the distribution and productivity of living marine resources including: 1) statistical species distribution models, 2) physiology-based, biophysical models of single life stages or the whole life cycle of species, 3) food web models, and 4) end-to-end models. Single pressures are rare and, in the future, models must be able to examine multiple factors affecting living marine resources such as interactions between: i) climate-driven changes in temperature regimes and acidification, ii) reductions in water quality due to eutrophication, iii) the introduction of alien invasive species, and/or iv) (over-)exploitation by fisheries. Statistical (correlative) approaches can be used to detect historical patterns which may not be relevant in the future. Advancing predictive capacity of changes in distribution and productivity of living marine resources requires explicit modelling of biological and physical mechanisms. New formulations are needed which (depending on the question) will need to strive for more realism in ecophysiology and behaviour of individuals, life history strategies of species, as well as trophodynamic interactions occurring at different spatial scales. Coupling existing models (e.g. physical, biological, economic) is one avenue that has proven successful. However, fundamental advancements are needed to address key issues such as the adaptive capacity of species/groups and ecosystems. The continued development of end-to-end models (e.g., physics to fish to human sectors) will be critical if we hope to assess how multiple pressures may interact to cause changes in living marine resources including the ecological and economic costs and trade-offs of different spatial management strategies. Given the strengths and weaknesses of the various types of models reviewed here, confidence in projections of changes in the

  10. Integrated data base for spent fuel and radwaste: inventories

    Notz, K.J.; Carter, W.L.; Kibbey, A.H.

    1982-01-01

    The Integrated Data Base (IDB) program provides and maintains current, integrated data on spent reactor fuel and radwaste, including historical data, current inventories, projected inventories, and material characteristics. The IDB program collects, organizes, integrates, and - where necessary - reconciles inventory and projection (I/P) and characteristics information to provide a coherent, self-consistent data base on spent fuel and radwaste

  11. Improving Nursing Communication Skills in an Intensive Care Unit Using Simulation and Nursing Crew Resource Management Strategies: An Implementation Project.

    Turkelson, Carman; Aebersold, Michelle; Redman, Richard; Tschannen, Dana

    Effective interprofessional communication is critical to patient safety. This pre-/postimplementation project used a multifaceted educational strategy with high-fidelity simulation to introduce evidence-based communication tools, adapted from Nursing Crew Resource Management, to intensive care unit nurses. Results indicated that participants were satisfied with the education, and their perceptions of interprofessional communication and knowledge improved. Teams (n = 16) that used the communication tools during simulation were more likely to identify the problem, initiate key interventions, and have positive outcomes.

  12. Data sharing report characterization of the surveillance and maintenance project miscellaneous process inventory waste items Oak Ridge National Laboratory, Oak Ridge, TN

    Weaver, Phyllis C. [Oak Ridge Inst. for Science and Education (ORISE), Oak Ridge, TN (United States)

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, to provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a sampling and analysis campaign to target certain items associated with URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing for final disposal. This waste was generated during processing, surveillance, and maintenance activities associated with the facilities identified in the process knowledge (PK) provided in Appendix A. A list of items for sampling and analysis were generated from a subset of materials identified in the WHP populations (POPs) 4, 5, 6, 7, and 8, plus a small number of items not explicitly addressed by the WHP. Specifically, UCOR S&M project personnel identified 62 miscellaneous waste items that would require some level of evaluation to identify the appropriate pathway for disposal. These items are highly diverse, relative to origin; composition; physical description; contamination level; data requirements; and the presumed treatment, storage, and disposal facility (TSDF). Because of this diversity, ORAU developed a structured approach to address item-specific data requirements necessary for acceptance in a presumed TSDF that includes the Environmental Management Waste Management Facility (EMWMF)—using the approved Waste Lot (WL) 108.1 profile—the Y-12 Sanitary Landfill (SLF) if appropriate; Energy

  13. Opening up the solar box: Cultural resource management and actor network theory in solar energy projects in the Mojave Desert

    Gorrie, Bryan F.

    This project considers the ways that Actor-Network Theory (ANT) can be brought to bear upon Cultural Resource Management (CRM) practices on renewable energy projects. ANT is a way of making inquiry into scientific knowledge practices and as CRM is intended to preserve environmental, historic, and prehistoric resources, it necessarily involves certain kinds of knowledge generation about regions in which projects are being developed. Because the practice of CRM is complex, involving a range of actors from developers to biologists, native peoples to academics, private landholders to environmental and cultural activists, it is imperative to account for the interests of all stakeholders and to resist devolving into the polemical relations of winners and losers, good and bad participants, or simple situations of right and wrong. This project intends to account for the "matters of concern" of various actors, both primary and secondary, by examining the case study of a single solar installation project in the Mojave Desert. A theoretical description of ANT is provided at the beginning and the concerns of this theory are brought to bear upon the case study project through describing the project, discussing the laws governing CRM on federal lands and in the state of California, and providing the points of view of various interviewees who worked directly or indirectly on various aspects of CRM for the solar project. The creators of ANT claim that it is not a methodology but it does speak to ethnomethodologies in that it insists that there is always something more to learn from inquiring into and describing any given situation. These descriptions avoid generalizations, providing instead various points of entry, from diverse perspectives to the project. There is an invitation to avoid assuming that one knows all there is to know about a given situation and to choose instead to continue investigating and thus give voice to the more obscure, often marginalized, voices in the

  14. The role of strategic forest inventories in aiding land management decision-making: Examples from the U.S

    W. Keith Moser; Renate Bush; John D. Shaw; Mark H. Hansen; Mark D. Nelson

    2010-01-01

    A major challenge for today’s resource managers is the linking of standand landscape-scale dynamics. The U.S. Forest Service has made major investments in programs at both the stand- (national forest project) and landscape/regional (Forest Inventory and Analysis [FIA] program) levels. FIA produces the only comprehensive and consistent statistical information on the...

  15. The international Genome sample resource (IGSR): A worldwide collection of genome variation incorporating the 1000 Genomes Project data.

    Clarke, Laura; Fairley, Susan; Zheng-Bradley, Xiangqun; Streeter, Ian; Perry, Emily; Lowy, Ernesto; Tassé, Anne-Marie; Flicek, Paul

    2017-01-04

    The International Genome Sample Resource (IGSR; http://www.internationalgenome.org) expands in data type and population diversity the resources from the 1000 Genomes Project. IGSR represents the largest open collection of human variation data and provides easy access to these resources. IGSR was established in 2015 to maintain and extend the 1000 Genomes Project data, which has been widely used as a reference set of human variation and by researchers developing analysis methods. IGSR has mapped all of the 1000 Genomes sequence to the newest human reference (GRCh38), and will release updated variant calls to ensure maximal usefulness of the existing data. IGSR is collecting new structural variation data on the 1000 Genomes samples from long read sequencing and other technologies, and will collect relevant functional data into a single comprehensive resource. IGSR is extending coverage with new populations sequenced by collaborating groups. Here, we present the new data and analysis that IGSR has made available. We have also introduced a new data portal that increases discoverability of our data-previously only browseable through our FTP site-by focusing on particular samples, populations or data sets of interest. © The Author(s) 2016. Published by Oxford University Press on behalf of Nucleic Acids Research.

  16. Texas, 2008 forest inventory and analysis factsheet

    James Bentley

    2011-01-01

    This science update summarizes the findings of the first statewide annual inventory conducted by the Southern Forest Inventory and Analysis (FIA) Program in cooperation with the Texas Forest Service of the forest resource attributes in Texas. The 254 counties of Texas are consolidated into seven FIA survey units—southeast (unit 1), the northeast (unit 2), the north...

  17. Texas, 2010 forest inventory and analysis factsheet

    James W. Bentley

    2012-01-01

    This science update summarizes the findings of the statewide annual inventory conducted by the Southern Forest Inventory and Analysis (FIA) Program in cooperation with the Texas Forest Service of the forest resource attributes in Texas. The 254 counties of Texas are consolidated into seven FIA survey units – southeast (unit 1), northeast (unit 2), north central (unit 3...

  18. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  19. Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.

    United States. Bonneville Power Administration.

    1993-10-01

    A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

  20. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  1. Privatization Financing Alternatives: Blending Private Capital and Public Resources for a Successful Project

    BT Oakley; JH Holbrook; L Scully; MR Weimar; PK Kearns; R DiPrinzio

    1998-10-19

    The U.S. Department of Energy (DOE) launched the Contract Reform Initiative in 1994 in order to improve the effectiveness and effkiency of managing major projects and programs. The intent of this initiative is to help DOE harness both technical and market forces to reduce the overall cost of accomplishing DOE's program goals. The new approach transfers greater risk to private contractors in order to develop incentives that align contractor performance with DOE's objectives. In some cases, this goal can be achieved through public-private partnerships wherein the govermhent and the contractor share risks associated with a project in a way that optimizes its economics. Generally, this requires that project risks are allocated to the party best equipped to manage and/or underwrite them. While the merits of privatization are well documented, the question of how privatized services should be financed is often debated. Given the cost of private sector equity and debt, it is difficult to ignore the lure of the government's "risk free" cost of capital. However, the source of financing for a project is an integral part of its overall risk allocation, and therefore, participation by the government as a financing source could alter the allocation of risks in the project, diminishing the incentive structure. Since the government's participation in the project's financing often can be a requirement for financial feasibility, the dilemma of structuring a role for the government without undermining the success of the project is a common and difficult challenge faced by policymakers around the world. However, before reverting to a traditional procurement approach where the government enters into a cost-plus risk profile, the government should exhaust all options that keep the private entity at risk for important aspects of the project. Government participation in a project can include a broad range of options and can be applied with precision to bridge a

  2. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Somalia

    Levich, Robert A.; Muller-Kahle, Eberhard

    1983-04-01

    The IUREP Orientation Phase Mission to Somalia suggests that in addition to the reasonably assured resources (RAR) of 5 000 t uranium and estimated additional resources (EAR) of 11 000 t uranium in calcrete deposits, the speculative resources (SR) could be within the wide range of 0 - 150 000 t uranium. The majority of these speculative resources are related to sandstone and calcrete deposits. The potential for magmatic hydrothermal deposits is relatively small. The Mission recommends an exploration programme of about US $ 22 000 000 to test the uranium potential of the country which is thought to be excellent. The Mission also suggests a reorganization of the Somalia Geological Survey in order to improve its efficiency. Recommended methods include geological mapping, Landsat Imagery Interpretation, airborne and ground scintillometer surveys, and geochemistry. Follow-up radiometric surveys, exploration geophysics, mineralogical studies, trenching and drilling are proposed in favourable areas

  3. Water resources data, Ohio: Water year 1991. Volume 2, St. Lawrence River Basin: Statewide project data

    Shindel, H.L.; Klingler, J.H.; Mangus, J.P.; Trimble, L.E.

    1992-03-01

    The Water Resources Division of the US Geological Survey (USGS), in cooperation with State agencies, obtains a large amount of data pertaining to the water resources of Ohio each water year. These data, accumulated during many years, constitute a valuable data base for developing an improved understanding of the water resources of the State. To make these data readily available to interested parties outside the USGS, the data are published annually in this report series entitled ``Water Resources Data--Ohio.`` This report (in two volumes) includes records on surface water and ground water in the State. Specifically, it contains: (1) Discharge records for 131 streamflow-gaging stations, 95 miscellaneous sites; (2) stage and content records for 5 streams, lakes, and reservoirs; (3) water-quality for 40 streamflow-gaging stations, 378 wells, and 74 partial-record sites; and (4) water levels for 431 observation wells.

  4. National Uranium Resource Evaluation: intermediate-grade uranium resource assessment project for part of the Maybell District, Sand Wash Basin, Colorado

    Goodknight, C.S.

    1983-04-01

    Intermediate-grade uranium resources in the Miocene Browns Park Formation were assessed for part of the Maybell district in the Sand Wash Basin, Colorado, as part of the National Uranium Resource Evaluation program conducted by Bendix Field Engineering Corporation for the US Department of Energy. Two sites, each 2 mi 2 (5 km 2 ) in size, in the district were selected to be assessed. Site selection was based on evaluation of geologic, geophysical, and geochemical data that were collected from a larger project area known to contain uranium enrichment. The assessment of the sites was accomplished primarily by drilling 19 holes through the Browns Park Formation and by using the geophysical and geochemical data from those holes and from a larger number of industry-drilled holes. Analytical results of samples from uranium prospects, mainly along faults in the sites, were also used for the assessment. Data from surface samples and from drill-hole samples and logs of the site south of Lay Creek indicate that no intermediate-grade uranium resources are present. However, similar data from the site north of Lay Creek verify that approximately 25 million lb (11.2 million kg) of intermediate-grade uranium resources may be present. This assessment assumes that an average uranium-enriched thickness of 10 ft (3 m) at a grade of 0.017% U 3 O 8 is present in at least two thirds of the northern site. Uranium enrichment in this site occurs mainly in the lower 150 ft (45 m) of the Browns Park Formation in fine- to medium-grained sandstone that contains abundant clay in its matrix. Facies variations within the Browns Park preclude correlation of individual beds or zones of uranium enrichment between closely spaced drill holes

  5. SPACE PHYSICS: Developing resources for astrophysics at A-level: the TRUMP Astrophysics project

    Swinbank, Elizabeth

    1997-01-01

    After outlining the astrophysical options now available in A-level physics syllabuses, this paper notes some of the particular challenges facing A-level teachers and students who chose these options and describes a project designed to support them. The paper highlights some key features of the project that could readily be incorporated into other areas of physics curriculum development.

  6. Reduce, Reuse, Recycle: Resources and Strategies for the Use of Writing Projects in Mathematics

    Latulippe, Joe; Latulippe, Christine

    2014-01-01

    As an often recommended but under-utilized pedagogical strategy, writing in mathematics has many benefits for students. However, creating and grading worthwhile writing projects can be more time-consuming than utilizing more traditional forms of assessment. This paper provides a concrete example of a writing project prompt, questions, directions,…

  7. Characteristic Features of Innovation Project Management Aimed at University Human Resource Development

    Kalimullin, Aydar M.; Yungblud, Valery T.; Khodyreva, Elena A.

    2016-01-01

    The relevance of the studied issue is based on the need to develop theoretical approaches to project management at a higher educational institution taking into consideration the specifics of the subject area of the projects that ensure finding the "growth points" and addressing the long-term objectives of a university in the field of…

  8. A method for evaluating the funding of components of natural resource and conservation projects

    Wellington, John F., E-mail: welling@ipfw.edu [Indiana University – Purdue University Fort Wayne (IPFW), Doermer School of Business, 203 Stonegate Drive Erie, PA 16505 (United States); Lewis, Stephen A., E-mail: lewis.sa07@gmail.com [Mongrel Works, LLC., Columbus, OH 43209 (United States)

    2016-02-15

    Many public and private entities such as government agencies and private foundations have missions related to the improvement, protection, and sustainability of the environment. In pursuit of their missions, they fund projects with related outcomes. Typically, the funding scene consists of scarce funding dollars for the many project requests. In light of funding limitations and funder's search for innovative funding schemes, a method to support the allocation of scarce dollars among project components is presented. The proposed scheme has similarities to methods in the project selection literature but differs in its focus on project components and its connection to and enumeration of the universe of funding possibilities. The value of having access to the universe is demonstrated with illustrations. The presentation includes Excel implementations that should appeal to a broad spectrum of project evaluators and reviewers. Access to the space of funding possibilities facilitates a rich analysis of funding alternatives. - Highlights: • Method is given for allocating scarce funding dollars among competing projects. • Allocations are made to fund parts of projects • Proposed method provides access to the universe of funding possibilities. • Proposed method facilitates a rich analysis of funding possibilities. • Excel spreadsheet implementations are provided.

  9. Development of a European resource on the origins of pathogens of aquaculture: The Europa Project

    Snow, M.; Barja, J.; Colquhoun, D.

    2004-01-01

    This workshop described the EUROPA project, an EU-funded program aimed at creating a web-based database of molecular sequence data-sets related to significant pathogens of aquaculture. The project aims to focus the efforts of fish health researchers into generating large, evolving and readily ava...

  10. A method for evaluating the funding of components of natural resource and conservation projects

    Wellington, John F.; Lewis, Stephen A.

    2016-01-01

    Many public and private entities such as government agencies and private foundations have missions related to the improvement, protection, and sustainability of the environment. In pursuit of their missions, they fund projects with related outcomes. Typically, the funding scene consists of scarce funding dollars for the many project requests. In light of funding limitations and funder's search for innovative funding schemes, a method to support the allocation of scarce dollars among project components is presented. The proposed scheme has similarities to methods in the project selection literature but differs in its focus on project components and its connection to and enumeration of the universe of funding possibilities. The value of having access to the universe is demonstrated with illustrations. The presentation includes Excel implementations that should appeal to a broad spectrum of project evaluators and reviewers. Access to the space of funding possibilities facilitates a rich analysis of funding alternatives. - Highlights: • Method is given for allocating scarce funding dollars among competing projects. • Allocations are made to fund parts of projects • Proposed method provides access to the universe of funding possibilities. • Proposed method facilitates a rich analysis of funding possibilities. • Excel spreadsheet implementations are provided

  11. Extracting the resource rent from the CDM projects: Can the Chinese Government do better?

    Liu Xuemei

    2010-01-01

    The revenue generated from a CDM project in China will be shared by the government and the project owner, and is also subject to the corporate income tax. This paper studies the impacts of the revenue sharing policy and income tax on the CDM market. The economic model presented in this paper shows that higher-cost CDM projects will be more affected by the CDM policies than lower-cost projects. In addition, the majority of CERs will be generated from lower-cost projects. This kind of distribution of CERs across different types of CDM projects, which is in line with the current picture of the CDM market in China, is not consistent with the goal of sustainable development. A simulation shows that a type-by-type tax/fee scheme would be more effective in assisting sustainable development than the current CDM policies. The study also suggests the government use negative tax/fee with the type-by-type scheme to subsidize the CDM projects that generate large sustainability benefits but would otherwise not be developed due to high costs. If all of the revenue from the CDM is recycled, it is estimated that CERs generation will increase by 98.28 MtC, mainly from the CDM projects that have substantial sustainability benefits for the host country.

  12. Uranium supply/demand projections to 2030 in the OECD/NEA-IAEA ''Red Book''. Nuclear growth projections, global uranium exploration, uranium resources, uranium production and production capacity

    Vance, Robert

    2009-01-01

    World demand for electricity is expected to continue to grow rapidly over the next several decades to meet the needs of an increasing population and economic growth. The recognition by many governments that nuclear power can produce competitively priced, base load electricity that is essentially free of greenhouse gas emissions, combined with the role that nuclear can play in enhancing security of energy supplies, has increased the prospects for growth in nuclear generating capacity. Since the mid-1960s, with the co-operation of their member countries and states, the OECD Nuclear Energy Agency (NEA) and the International Atomic Energy Agency (IAEA) have jointly prepared periodic updates (currently every 2 years) on world uranium resources, production and demand. These updates have been published by the OECD/NEA in what is commonly known as the ''Red Book''. The 2007 edition replaces the 2005 edition and reflects information current as of 1 st January 2007. Uranium 2007: Resources, Production and Demand presents, in addition to updated resource figures, the results of a recent review of world uranium market fundamentals and provides a statistical profile of the world uranium industry. It contains official data provided by 40 countries (and one Country Report prepared by the IAEA Secretariat) on uranium exploration, resources, production and reactor-related requirements. Projections of nuclear generating capacity and reactor-related uranium requirements to 2030 as well as a discussion of long-term uranium supply and demand issues are also presented. (orig.)

  13. Engaging cultural resources to promote mental health in Dutch LSES neighborhoods: study of a community-based participatory media project.

    Knibbe, Mare; de Vries, Marten; Horstman, Klasien

    2017-06-01

    Community-based participatory media projects form a promising new strategy for mental health promotion that can help address the mental health-gap identified by the World Health Organization. (2008b) mhGAP, Mental Health Gap Action Programme: Scaling Up Care for Mental, Neurological and Substance Use Disorders. World Health Organization, Geneva. In this article we present an ethnographic study about a participatory media project that was developed to promote mental health in selected Dutch low socio-economic status neighborhoods. Through narrowcastings (group film viewings), participant observation and interviews we mapped the ways in which the media project effected and facilitated the collective sense-making process of the audience with regard to sources of stress impacting mental health and opportunities for action. These determinants of mental health are shaped by cultural dimensions, since the cultural context shapes everyday experiences of stress as well as the resources and skills to manage them. Our analysis shows that the media project engaged cultural resources to challenge stressful social scripts. We conclude that more attention should be paid to cultural narratives in a community to understand how health promotion strategies can support social resilience. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  14. A hybrid electromagnetism-like algorithm for a multi-mode resource-constrained project scheduling problem

    Mohammad Hossein Sadeghi

    2013-08-01

    Full Text Available In this paper, two different sub-problems are considered to solve a resource constrained project scheduling problem (RCPSP, namely i assignment of modes to tasks and ii scheduling of these tasks in order to minimize the makespan of the project. The modified electromagnetism-like algorithm deals with the first problem to create an assignment of modes to activities. This list is used to generate a project schedule. When a new assignment is made, it is necessary to fix all mode dependent requirements of the project activities and to generate a random schedule with the serial SGS method. A local search will optimize the sequence of the activities. Also in this paper, a new penalty function has been proposed for solutions which are infeasible with respect to non-renewable resources. Performance of the proposed algorithm has been compared with the best algorithms published so far on the basis of CPU time and number of generated schedules stopping criteria. Reported results indicate excellent performance of the algorithm.

  15. Teaching Sustainable Water Resources and Low Impact Development: A Project Centered Course for First-Year Undergraduates

    Cianfrani, C. M.

    2009-12-01

    Teaching Sustainable Water Resources and Low Impact Development: A Project Centered Course for First-Year Undergraduates Christina M. Cianfrani Assistant Professor, School of Natural Science, Hampshire College, 893 West Avenue, Amherst, MA 01002 Sustainable water resources and low impact development principles are taught to first-year undergraduate students using an applied design project sited on campus. All students at Hampshire College are required to take at least one natural science course during their first year as part of their liberal arts education. This requirement is often met with resistance from non-science students. However, ‘sustainability’ has shown to be a popular topic on campus and ‘Sustainable Water Resources’ typically attracts ~25 students (a large class size for Hampshire College). Five second- or third-year students are accepted in the class as advanced students and serve as project leaders. The first-year students often enter the class with only basic high school science background. The class begins with an introduction to global water resources issues to provide a broad perspective. The students then analyze water budgets, both on a watershed basis and a personal daily-use basis. The students form groups of 4 to complete their semester project. Lectures on low impact design principles are combined with group work sessions for the second half of the semester. Students tour the physical site located across the street from campus and begin their project with a site analysis including soils, landcover and topography. They then develop a building plan and identify preventative and mitigative measures for dealing with stormwater. Each group completes TR-55 stormwater calculations for their design (pre- and post-development) to show the state regulations for quantity will be met with their design. Finally, they present their projects to the class and prepare a formal written report. The students have produced a wide variety of creative

  16. NASA Ames DEVELOP Interns: Helping the Western United States Manage Natural Resources One Project at a Time

    Justice, Erin; Newcomer, Michelle

    2010-01-01

    The western half of the United States is made up of a number of diverse ecosystems ranging from arid desert to coastal wetlands and rugged forests. Every summer for the past 7 years students ranging from high school to graduate level gather at NASA Ames Research Center (ARC) as part of the DEVELOP Internship Program. Under the guidance of Jay Skiles [Ames Research Center (ARC) - Ames DEVELOP Manager] and Cindy Schmidt [ARC/San Jose State University Ames DEVELOP Coordinator] they work as a team on projects exploring topics including: invasive species, carbon flux, wetland restoration, air quality monitoring, storm visualizations, and forest fires. The study areas for these projects have been in Washington, Utah, Oregon, Nevada, Hawaii, Alaska and California. Interns combine data from NASA and partner satellites with models and in situ measurements to complete prototype projects demonstrating how NASA data and resources can help communities tackle their Earth Science related problems.

  17. Hydrography - Water Resources

    NSGIC Education | GIS Inventory — A Water Resource is a DEP primary facility type related to the Water Use Planning Program. The sub-facility types related to Water Resources that are included are:...

  18. Minnesota DNR Forest Stand Inventory Version 2

    Minnesota Department of Natural Resources — This layer is a digital inventory of individual forest stands. The data is collected by DNR Foresters in each DNR Forestry Administrative Area, and is updated on a...

  19. Developing Inventory Projection Models Using Empirical Net Forest Growth and Growing-Stock Density Relationships Across U.S. Regions and Species Group

    Prakash Nepal; Peter J. Ince; Kenneth E. Skog; Sun J. Chang

    2012-01-01

    This paper describes a set of empirical net forest growth models based on forest growing-stock density relationships for three U.S. regions (North, South, and West) and two species groups (softwoods and hardwoods) at the regional aggregate level. The growth models accurately predict historical U.S. timber inventory trends when we incorporate historical timber harvests...

  20. Effort estimation for enterprise resource planning implementation projects using social choice - a comparative study

    Koch, Stefan; Mitlöhner, Johann

    2010-08-01

    ERP implementation projects have received enormous attention in the last years, due to their importance for organisations, as well as the costs and risks involved. The estimation of effort and costs associated with new projects therefore is an important topic. Unfortunately, there is still a lack of models that can cope with the special characteristics of these projects. As the main focus lies in adapting and customising a complex system, and even changing the organisation, traditional models like COCOMO can not easily be applied. In this article, we will apply effort estimation based on social choice in this context. Social choice deals with aggregating the preferences of a number of voters into a collective preference, and we will apply this idea by substituting the voters by project attributes. Therefore, instead of supplying numeric values for various project attributes, a new project only needs to be placed into rankings per attribute, necessitating only ordinal values, and the resulting aggregate ranking can be used to derive an estimation. We will describe the estimation process using a data set of 39 projects, and compare the results to other approaches proposed in the literature.