WorldWideScience

Sample records for reservation operable unit

  1. Seminar 1. Joint Military Operations. Application of the Operational Reserve

    National Research Council Canada - National Science Library

    Copp, A

    1997-01-01

    .... As a means of achieving decisive effect at the operational level of war, the operational reserve should be considered an operational function and should be addressed as both a planning element...

  2. Operable Unit Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of operable unit data from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  3. Fundamental Drivers of the Cost and Price of Operating Reserves

    Energy Technology Data Exchange (ETDEWEB)

    Hummon, Marissa [National Renewable Energy Lab. (NREL), Golden, CO (United States); Denholm, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jorgenson, Jennie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Palchak, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kirby, Brendan [Kirby Consultant; Ma, Ookie [U.S. Department of Energy, Washington, DC (United States)

    2013-07-01

    Operating reserves impose a cost on the electric power system by forcing system operators to keep partially loaded spinning generators available for responding to system contingencies variable demand. In many regions of the United States, thermal power plants provide a large fraction of the operating reserve requirement. Alternative sources of operating reserves, such as demand response and energy storage, may provide more efficient sources of these reserves. However, to estimate the potential value of these services, the cost of reserve services under various grid conditions must first be established. This analysis used a commercial grid simulation tool to evaluate the cost and price of several operating reserve services, including spinning contingency reserves and upward regulation reserves. These reserve products were evaluated in a utility system in the western United States, considering different system flexibilities, renewable energy penetration, and other sensitivities. The analysis demonstrates that the price of operating reserves depend highly on many assumptions regarding the operational flexibility of the generation fleet, including ramp rates and the fraction of fleet available to provide reserves.

  4. Unit 34: Overlay Operators

    OpenAIRE

    Unit 34, CCTP; Pitts, Teresa A.

    1998-01-01

    This unit describes types, example uses and implementation of different overlay operations. Using commands in ESRI’s Arc/Info, it summarizes necessary pre-overlay and overlay tasks in an example application in which locations for Gypsy Moth traps must be determined.

  5. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  6. Operational Army Reserve Implications for Organizational Health

    National Research Council Canada - National Science Library

    Dahms, Jonathan A

    2007-01-01

    The Army Reserve has been in a constant state of mobilization since 1995 with the advent of the Bosnia crisis and the pace of mobilization increased exponentially after the terrorist attacks of September 11, 2001...

  7. 7 CFR 1212.54 - Operating reserve.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... RESEARCH, PROMOTION, CONSUMER EDUCATION AND INDUSTRY INFORMATION ORDER Honey Packers and Importers Research, Promotion, Consumer Education, and Industry Information Order Expenses and Assessments § 1212.54 Operating...

  8. 24 CFR 904.112 - Operating reserve.

    Science.gov (United States)

    2010-04-01

    ...) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT...) Working capital for payment of a deficit in a homebuyer's NRMR, until such deficit is offset by future... deficit in the operation of the Project for a fiscal year, including a deficit resulting from monthly...

  9. 24 CFR 891.860 - Operating reserves.

    Science.gov (United States)

    2010-04-01

    ... an amount sufficient to cover the operating expenses of the development for at least a three-month period. (b) Project income, project rental assistance, tenant rents, and tax credit equity may be used to...) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND...

  10. 2007 Posture Statement, Army Reserve: An Operational Force

    National Research Council Canada - National Science Library

    Stultz, Jack C

    2007-01-01

    The 2007 Army Reserve Posture Statement describes how the Army Reserve continues to transform from a strategic reserve to an operational force, meeting today's challenges as it better prepares for future uncertainties...

  11. Improving Deterministic Reserve Requirements for Security Constrained Unit Commitment and Scheduling Problems in Power Systems

    Science.gov (United States)

    Wang, Fengyu

    Traditional deterministic reserve requirements rely on ad-hoc, rule of thumb methods to determine adequate reserve in order to ensure a reliable unit commitment. Since congestion and uncertainties exist in the system, both the quantity and the location of reserves are essential to ensure system reliability and market efficiency. The modeling of operating reserves in the existing deterministic reserve requirements acquire the operating reserves on a zonal basis and do not fully capture the impact of congestion. The purpose of a reserve zone is to ensure that operating reserves are spread across the network. Operating reserves are shared inside each reserve zone, but intra-zonal congestion may block the deliverability of operating reserves within a zone. Thus, improving reserve policies such as reserve zones may improve the location and deliverability of reserve. As more non-dispatchable renewable resources are integrated into the grid, it will become increasingly difficult to predict the transfer capabilities and the network congestion. At the same time, renewable resources require operators to acquire more operating reserves. With existing deterministic reserve requirements unable to ensure optimal reserve locations, the importance of reserve location and reserve deliverability will increase. While stochastic programming can be used to determine reserve by explicitly modelling uncertainties, there are still scalability as well as pricing issues. Therefore, new methods to improve existing deterministic reserve requirements are desired. One key barrier of improving existing deterministic reserve requirements is its potential market impacts. A metric, quality of service, is proposed in this thesis to evaluate the price signal and market impacts of proposed hourly reserve zones. Three main goals of this thesis are: 1) to develop a theoretical and mathematical model to better locate reserve while maintaining the deterministic unit commitment and economic dispatch

  12. Unit commitment with probabilistic reserve: An IPSO approach

    International Nuclear Information System (INIS)

    Lee, Tsung-Ying; Chen, Chun-Lung

    2007-01-01

    This paper presents a new algorithm for solution of the nonlinear optimal scheduling problem. This algorithm is named the iteration particle swarm optimization (IPSO). A new index, called iteration best, is incorporated into particle swarm optimization (PSO) to improve the solution quality and computation efficiency. IPSO is applied to solve the unit commitment with probabilistic reserve problem of a power system. The outage cost as well as fuel cost of thermal units was considered in the unit commitment program to evaluate the level of spinning reserve. The optimal scheduling of on line generation units was reached while minimizing the sum of fuel cost and outage cost. A 48 unit power system was used as a numerical example to test the new algorithm. The optimal scheduling of on line generation units could be reached in the testing results while satisfying the requirement of the objective function

  13. CIRCULATING INTER-OPERATIONAL RESERVES: LONG-TIME ERRORS

    Directory of Open Access Journals (Sweden)

    G. A. Каlinkin

    2009-01-01

    Full Text Available The paper shows that for dozens of years some researchers have presented a formula for calculating changes in circulating inter-operational reserve in the working phase of the flow production line in a wrong way as a formula for calculating a maximum change in the circulating inter-operational reserve of the working phase and the paper proposes an algorithm for calculation of circulating reserve in a boundary point of working phases of straight flow line. Having calculated a maximum change of the circulating reserve in the working phases it is possible to obtain an algebraic sum of reserve changes . After that the total algebraic sum of circulating reserve changes in boundary points from the initial phase to the final one. According to a minimum value of the algebraic sum of  the reserve changes in the phases it is possible to find a boundary point of phases where the reserve is equal to zero. A reserve in any boundary point  of  phases  is  calculated  through  finding  an  absolute value of the algebraic sum of reserve changes from boundary point of phases, where the reserve is equal to zero, to the sought one.

  14. Maintaining an Operational U.S. Army Reserve through Medical Readiness

    Science.gov (United States)

    2012-03-07

    Immunizations will be monitored and kept current. Pass: Current for Total Force/All Services vaccines including hepatitis A, tetanus-diphtheria ( Td ...reserve soldiers required to sustain current and future operations. Endnotes 1 LTG Jack C. Stultz and CSM Michael D. Schultz, The United States...11 LTG Jack C. Stultz and CSM Michael D. Schultz, The United States Army Reserve 2011 Posture Statement, Fiscal Year 2011, Posture Statement

  15. Reserve reporting in the United States coal industry

    International Nuclear Information System (INIS)

    Grubert, Emily

    2012-01-01

    United States energy policymaking can be better supported with accurate and consistent data on coal reserves, both in the public and private sectors. In particular, reserve data for coal and other energy resources should be directly comparable so that decision-makers can easily understand the relationship among available resources. Long-term policy and investment choices regarding energy security, the environment, and resource allocation depend on accurate information, but existing and easily available data on the magnitude of geologically, environmentally, economically, socially, and legally accessible coal reserves are of insufficient quality to guide such decisions. Even still, these data are often presented for use in policy and energy analysis. Currently, coal reserves are overstated relative to competitor energy resource reserves, in part because coal reporting standards have historically been more liberal and vague than standards for resources like natural gas. Overstating the marketable coal resource could lead to inefficient allocation of limited capital investment that can be difficult to reverse. US government bodies like the Energy Information Administration, United States Geological Survey, Securities and Exchange Commission, and Bureau of Land Management can help correct deficiencies by clarifying standards and collecting data that are relevant for decision-makers, such as energy-based reserve information. - Highlights: ► US Coal reserves are important to public and private policy and investment decisions. ► Poor quality data and coal reserve overreporting misrepresent reality. ► Choices made based on bad information can lead to long-term capital misallocation. ► Numerous government agencies are tasked with providing public data on coal reserves. ► Clearer, more restrictive reserves reporting standards can aid decision-makers.

  16. Organization of Control Units with Operational Addressing

    OpenAIRE

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  17. Disaggregating reserve-to-production ratios: An algorithm for United States oil and gas reserve development

    Science.gov (United States)

    Williams, Charles William

    Reserve-to-production ratios for oil and gas development are utilized by oil and gas producing states to monitor oil and gas reserve and production dynamics. These ratios are used to determine production levels for the manipulation of oil and gas prices while maintaining adequate reserves for future development. These aggregate reserve-to-production ratios do not provide information concerning development cost and the best time necessary to develop newly discovered reserves. Oil and gas reserves are a semi-finished inventory because development of the reserves must take place in order to implement production. These reserves are considered semi-finished in that they are not counted unless it is economically profitable to produce them. The development of these reserves is encouraged by profit maximization economic variables which must consider the legal, political, and geological aspects of a project. This development is comprised of a myriad of incremental operational decisions, each of which influences profit maximization. The primary purpose of this study was to provide a model for characterizing a single product multi-period inventory/production optimization problem from an unconstrained quantity of raw material which was produced and stored as inventory reserve. This optimization was determined by evaluating dynamic changes in new additions to reserves and the subsequent depletion of these reserves with the maximization of production. A secondary purpose was to determine an equation for exponential depletion of proved reserves which presented a more comprehensive representation of reserve-to-production ratio values than an inadequate and frequently used aggregate historical method. The final purpose of this study was to determine the most accurate delay time for a proved reserve to achieve maximum production. This calculated time provided a measure of the discounted cost and calculation of net present value for developing new reserves. This study concluded that

  18. [Operational medical reserve within the French Mililitary Health Service].

    Science.gov (United States)

    Vergez-Larrouget, Claude; Roberton, Delphine; Schneider, Cindy; Reggad, Farid; Charrot, François; Cueff, Serge

    2014-09-01

    The operational reserve is an essential component of the army health service thanks to the trained and experienced healthcare professionals. From a civilian background or with prior active duty, their technical and military skills enable them to provide medical support for all types of missions, both within France and abroad.

  19. The Australian money market and the operations of the Reserve Bank of Australia: a comparative analysis

    OpenAIRE

    Michael Dotsey

    1987-01-01

    This article provides a comparative analysis of central bank operating procedures in Australia and the United States. It also examines the effect that the structure of overnight money markets, reserve requirements, and central bank lending procedures have on monetary control in both countries. Evidently the Australian financial structure is such that an interest rate instrument provides superior control of money, a result that may not hold in the United States.

  20. Assessment of operation reserves in hydrothermal electric systems with high wind generation

    NARCIS (Netherlands)

    Ramos, Andres; Rivier, Michel; García-González, Javier; Latorre, Jesus M.; Morales Espana, G.

    2016-01-01

    In this paper, we propose a method to analyze the amount of operation reserves procured in a system based on two stages. The first stage is a detailed hourly unit commitment and the second stage is a simulation model with a shorter time period. The method is applied to the Spanish hydrothermal

  1. Environmental Engineering Unit Operations and Unit Processes Laboratory Manual.

    Science.gov (United States)

    O'Connor, John T., Ed.

    This manual was prepared for the purpose of stimulating the development of effective unit operations and unit processes laboratory courses in environmental engineering. Laboratory activities emphasizing physical operations, biological, and chemical processes are designed for various educational and equipment levels. An introductory section reviews…

  2. Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik; Gao, Wenzhong

    2015-10-27

    The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

  3. Physical protection of nuclear operational units

    International Nuclear Information System (INIS)

    1981-07-01

    The general principles of and basic requirements for the physical protection of operational units in the nuclear field are established. They concern the operational units whose activities are related with production, utilization, processing, reprocessing, handling, transport or storage of materials of interest for the Brazilian Nuclear Program. (I.C.R.) [pt

  4. Productivity benchmarks for operative service units.

    Science.gov (United States)

    Helkiö, P; Aantaa, R; Virolainen, P; Tuominen, R

    2016-04-01

    Easily accessible reliable information is crucial for strategic and tactical decision-making on operative processes. We report development of an analysis tool and resulting metrics for benchmarking purposes at a Finnish university hospital. The analysis tool is based on data collected in a resource management system and an in-house cost-reporting database. The exercise reports key metrics for four operative service units and six surgical units from 2014 and the change from year 2013. Productivity, measured as total costs per total hours, ranged from 658 to 957 €/h and utilization of the total available resource hours at the service unit level ranged from 66% to 74%. The lowest costs were in a unit running only regular working hour shifts, whereas the highest costs were in a unit operating on 24/7 basis. The tool includes additional metrics on operating room (OR) scheduling and monthly data to support more detailed analysis. This report provides the hospital management with an improved and detailed overview of its operative service units and the surgical process and related costs. The operating costs are associated with on call duties, size of operative service units, and the requirements of the surgeries. This information aids in making mid- to long range decisions on managing OR capacity. © 2016 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  5. Naval Reserve Force: Cost and Benefit Analysis of Reducing the Number of Naval Surface Reserve Force Operating Budget Holders

    National Research Council Canada - National Science Library

    Young, Eric

    1997-01-01

    .... This thesis examines one of Commander Naval Surface Reserve Force's initiatives for reducing the current number of Operating Budget holder's Comptroller Departments without sacrificing efficiency...

  6. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  7. Optimal Location of Marine Forces Reserve Units by Demographics

    Science.gov (United States)

    2014-06-01

    GA Naval Air Station Atlanta, GA Robins Air Force Base/Warner Robins, GA Dobbins Army Reserve Base, GA Forest Park, GA Rome, GA a31 Marine...Island Arsenal, IL a65 Grissom Army Reserve Base/ Peru , IN Indianapolis, IN Terre Haute, IN a66 Perrysburg, OH Selfridge Army National Guard Base

  8. Requirement for Naval Reserve Component Units Not Assigned to Support Regional Contingencies

    National Research Council Canada - National Science Library

    Gimble, Thomas

    1996-01-01

    Our primary objective was to determine whether a valid need exists for Naval Reserve units and non-unit Reserve personnel who are not assigned to meet the needs of anticipated regional contingencies...

  9. Morphological operators on the unit circle.

    Science.gov (United States)

    Hanbury, A G; Serra, J

    2001-01-01

    Images encoding angular information are common in image analysis. Examples include the hue band of color images, or images encoding directional texture information. Applying mathematical morphology to image data distributed on the unit circle is not immediately possible, as the unit circle is not a lattice. Three approaches to solving this problem are presented. First, difference-based operators are studied (e.g., gradient, top-hat). Second, a definition of grouped circular data is suggested, and "pseudo" morphological operators, which operate only on grouped data, are introduced. Finally, processing using pixel labeling is presented, leading to the development of a cyclic opening operator. Applications for treating the hue band of color images and for finding perturbations in wood texture are given.

  10. Operating Reserves and Wind Power Integration: An International Comparison; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M.; Donohoo, P.; Lew, D.; Ela, E.; Kirby, B.; Holttinen, H.; Lannoye, E.; Flynn, D.; O' Malley, M.; Miller, N.; Eriksen, P. B.; Gottig, A.; Rawn, B.; Gibescu, M.; Lazaro, E. G.; Robitaille, A.; Kamwa, I.

    2010-10-01

    This paper provides a high-level international comparison of methods and key results from both operating practice and integration analysis, based on an informal International Energy Agency Task 25: Large-scale Wind Integration.

  11. Ready, Reliable, and Relevant: The Army Reserve Component as an Operational Reserve

    Science.gov (United States)

    2015-05-21

    Kurt A. Rorvik 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Advanced Military...Consequence Management Response Force CEF Contingency Expeditionary Force CJCS Chairman of the Joint Chiefs of Staff CMH Center of Military...Treaty Organization vii NCO Non-Commissioned Officer NDAA National Defense Authorization Act NGB National Guard Bureau NOS Notification of

  12. UNITED STATES SPECIAL OPERATIONS FORCES IN AFRICA

    Science.gov (United States)

    2016-02-16

    reduce human suffering, disease, hunger , or privation. DOS and the United States Agency for International Development would typically support the...Operations (MISO). MISO are planned to convey selected information and indicators to foreign audiences to influence their emotions , motives, objective

  13. Key for the classification of reserves/resources - United Nations International Framework Classification for Reserves/Resources (UNFC)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-08-22

    Since the introduction of the United Nations International Framework Classification for Reserves/Resources (UNFC) - Solid Fuels and Mineral Commodities in 1977 by UNECE, recommended for application worldwide in 1998 by the UN Economic and Social Council (ECOSOC), some of those using the system who do not deal daily with the classification of reserves/resources are not certain how they should apply this reserves/resources classification system. The classification key described here provides the user with an easy to use tool for classifying reserves/resources according to the UN Framework Classification. This document is submitted by the Government of Germany. 9 refs., 2 figs., 2 tabs., 1 append.

  14. Operating performance of LWR nuclear generating units

    International Nuclear Information System (INIS)

    Pia, S.

    1984-01-01

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  15. Stochastic and Deterministic Unit Commitment Considering Uncertainty and Variability Reserves for High Renewable Integration

    Directory of Open Access Journals (Sweden)

    Ilias G. Marneris

    2017-01-01

    Full Text Available The uncertain and variable nature of renewable energy sources in modern power systems raises significant challenges in achieving the dual objective of reliable and economically efficient system operation. To address these challenges, advanced scheduling strategies have evolved during the past years, including the co-optimization of energy and reserves under deterministic or stochastic Unit Commitment (UC modeling frameworks. This paper presents different deterministic and stochastic day-ahead UC formulations, with focus on the determination, allocation and deployment of reserves. An explicit distinction is proposed between the uncertainty and the variability reserve, capturing the twofold nature of renewable generation. The concept of multi-timing scheduling is proposed and applied in all UC policies, which allows for the optimal procurement of such reserves based on intra-hourly (real-time intervals, when concurrently optimizing energy and commitments over hourly intervals. The day-ahead scheduling results are tested against different real-time dispatch regimes, with none or limited look-ahead capability, or with the use of the variability reserve, utilizing a modified version of the Greek power system. The results demonstrate the enhanced reliability achieved by applying the multi-timing scheduling concept and explicitly considering the variability reserve, and certain features regarding the allocation and deployment of reserves are discussed.

  16. Coal reserves in the United States and around the world

    International Nuclear Information System (INIS)

    Jubert, K.; Masudi, H.

    1995-01-01

    There is an urgent need to examine the role that coal might play in meeting world energy needs during the next 20 years. Oil from the Organization of Petroleum Exporting Countries (OPEC) can no longer be relied upon to provide expanding supplies of energy, even with rapidly rising prices. Neither can nuclear energy be planned on for rapid expansion worldwide until present uncertainties about it are resolved. Yet, the world's energy needs will continue to grow, even with vigorous energy conservation programs and with optimistic rates of expansion in the use of solar energy. Coal already supplies 25% of the world's energy, its reserves are vast, and it is relatively inexpensive. This study, with the aid of reports from the World Coal Study (WOCOL) examines the needs for coal on a global scale, its availability past and present, and its future prospects

  17. Performance Analysis of the United States Marine Corps War Reserve Materiel Program Process Flow

    Science.gov (United States)

    2016-12-01

    WAR RESERVE MATERIEL PROGRAM PROCESS FLOW December 2016 By: Nathan A. Campbell Luke S. Helwig Spencer D. Sweet Advisors: Eddine Dahel...RESERVE MATERIEL PROGRAM PROCESS FLOW Nathan A. Campbell , Captain, United States Marine Corps Luke S. Helwig, Captain, United States Marine...PERFORMANCE ANALYSIS OF THE UNITED STATES MARINE CORPS WAR RESERVE MATERIEL PROGRAM PROCESS FLOW 5. FUNDING NUMBERS 6. AUTHOR(S) Nathan A. Campbell

  18. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  19. Higher-Order Thinking in the Unit Operations Laboratory.

    Science.gov (United States)

    Miller, Ronald L.; Ely, James F.; Baldwin, Robert M.; Olds, Barbara M.

    1998-01-01

    Argues that the unit operations laboratory provides an ideal setting to help chemical engineering students become better engineering practitioners. Describes a summer program at the Colorado School of Mines that incorporates experience into a unit operations laboratory. (DDR)

  20. 200-BP-5 operable unit treatability test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

  1. How the United States Army Reserve Can Effectively Support the Defense Support of Civilian Authorities Mission

    Science.gov (United States)

    2015-02-15

    status, Soldiers are paid for unit training assemblies or UTAs . A UTA lasts four hours and is equal to one day of active duty base pay. An eight-hour...radiological nuclear (CBRN) units in communities throughout the United States. The USAR focus on the homeland security and defense mission will allow the...active Army to concentrate its resources on preparing for and responding to overseas contingency operations. Using the USAR in support of the ARNG in

  2. Sharing the Burden and Risk: An Operational Assessment of the Reserve Components in Operation Iraqi Freedom

    Science.gov (United States)

    2016-10-01

    components and between Services built the foundation of trust and teamwork necessary to prosecute the campaign. In terms of operational communities...integration efforts were cultural, based on outdated organizational practices and attitudes . D. Conclusion In this chapter, IDA looked at ARC...concern with respect to professionalism and discipline were of three types. The first was discussed previously: the difference in attitude toward

  3. 40 CFR 73.80 - Operation of allowance reserve program for conservation and renewable energy.

    Science.gov (United States)

    2010-07-01

    ... for conservation and renewable energy. 73.80 Section 73.80 Protection of Environment ENVIRONMENTAL... and Renewable Energy Reserve § 73.80 Operation of allowance reserve program for conservation and renewable energy. (a) General. The Administrator will allocate allowances from the Conservation and...

  4. Evaluation of blood reservation and use for caesarean sections in a tertiary maternity unit in south western Nigeria

    Directory of Open Access Journals (Sweden)

    Oshodi Yussuf A

    2010-09-01

    Full Text Available Abstract Background Haemorrhage from obstetric causes is the most common cause of maternal mortality in the developing world. Prevention of mortality from haemorrhage will necessarily involve prompt blood transfusions among other life saving measures. There are however limited stocks of fresh or stored blood in many health care facilities in Sub Saharan Africa. Caesarean section has been identified as a common indication for blood transfusion in obstetrics practice and its performance is often delayed by non availability of blood in our centre. An evaluation of blood reservation and use at caesarean sections in a tertiary maternity unit in Lagos, south western Nigeria should therefore assist in formulating the most rational blood transfusion policies. Methods Case records of 327 patients who had elective and emergency caesarian sections at the Lagos State University Teaching Hospital between 1st October and 31st December 2007 were reviewed. Data pertaining to age, parity, booking status, type and indication for Caesarean section, pre- and post-operative packed cell volume, blood loss at surgery, units of blood reserved in the blood bank, unit(s of blood transfused and duration of hospital stay was extracted and the data analysed. Results There were 1056 deliveries out of which 327 (31% were by Caesarean section. During the study period, a total of 654 units of blood were reserved in the blood bank and subsequently made available in theatre. Out of this number, only 89 (13.6% were transfused to 41 patients. Amongst those transfused, twenty-six (54% were booked and 31 (75.6% had primary caesarian section. About 81% of those transfused had emergency caesarean section. The most common indication for surgery among those transfused were placenta praevia (9 patients with 21 units of blood and cephalo-pelvic disproportion (8 patients with 13 units. Conclusion Even though a large number of units of blood was reserved and made available in the theatre at

  5. Incorporating Safety into a Unit Operations Laboratory Course.

    Science.gov (United States)

    King, Julia A.

    1998-01-01

    Details the incorporation of safety procedures and issues into the curriculum of an undergraduate chemical engineering unit operations laboratory course. Includes checklists and sample reporting forms. (DDR)

  6. Provision of operating reserves with distributed generation; Fornecimento de reservas operativas com geracao distribuida

    Energy Technology Data Exchange (ETDEWEB)

    Chaves, Francisco David Moya; Jannuzzi, Gilberto de Martino [Universidade Estadual de Campinas (FEM/UNICAMP), SP (Brazil). Fac. de Engenharia Mecanica; Silva, Luiz Carlos Pereira da [Universidade Estadual de Campinas (FEEC/UNICAMP), SP (Brazil). Fac. de Engenharia Eletrica e de Computacao

    2008-07-01

    Among the ancillary services, the operating reserves are important researching aspects, which deal with supplying ways and selling-buying prices. Currently, distributed generation (DG) rises as a new participant in providing ancillary services, therefore, it is of great importance in operating reserves subject. This work shows some advantages and technical drawbacks by using DG when operating reserves are supplied. Different sceneries were computed where the electric generation was performed in a centralized and non-centralized way respectively. A methodology for identifying the maximum DG, which can be allocated, is proposed; this maximum level can be assessed without carrying out a negative impact in the network. Diverse DG technologies, which present better performance in supplying such reserves, are also presented. (author)

  7. Quantitative, steady-state properties of Catania's computational model of the operant reserve.

    Science.gov (United States)

    Berg, John P; McDowell, J J

    2011-05-01

    Catania (2005) found that a computational model of the operant reserve (Skinner, 1938) produced realistic behavior in initial, exploratory analyses. Although Catania's operant reserve computational model demonstrated potential to simulate varied behavioral phenomena, the model was not systematically tested. The current project replicated and extended the Catania model, clarified its capabilities through systematic testing, and determined the extent to which it produces behavior corresponding to matching theory. Significant departures from both classic and modern matching theory were found in behavior generated by the model across all conditions. The results suggest that a simple, dynamic operant model of the reflex reserve does not simulate realistic steady state behavior. Copyright © 2011 Elsevier B.V. All rights reserved.

  8. A Chronological Reliability Model to Assess Operating Reserve Allocation to Wind Power Plants: Preprint

    International Nuclear Information System (INIS)

    Milligan, M. R.

    2001-01-01

    As the use of wind power plants increases worldwide, it is important to understand the effect these power sources have on the operations of the grid. This paper focuses on the operating reserve impact of wind power plants. Many probabilistic methods have been applied to power system analysis, and some of these are the basis of reliability analysis. This paper builds on a probabilistic technique to allocate the operating reserve burden among power plants in the grid. The method was originally posed by Strbac and Kirschen[1] and uses an allocation that prorates the reserve burden based on expected energy not delivered. Extending this method to include wind power plants allows the reserve burden to be allocated among different plants using the same method, yet incorporates information about the intermittent nature of wind power plants

  9. 2014 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2016-05-01

    Based on information provided by operators who responded to the 2014 National Census of Ferry Operators (NCFO), the Bureau of Transportation Statistics (BTS) conservatively estimates that ferries in the United States carried just over 115 million pas...

  10. Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    During fiscal year 1992, the reserves generated $473 million in revenues, a $181 million decrease from the fiscal year 1991 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $200 million, resulting in net cash flow of $273 million, compared with $454 million in fiscal year 1991. From 1976 through fiscal year 1992, the Naval Petroleum and Oil Shale Reserves generated more than $15 billion in revenues and a net operating income after costs of $12.5 billion. In fiscal year 1992, production at the Naval Petroleum Reserves at maximum efficient rates yielded 26 million barrels of crude oil, 119 billion cubic feet of natural gas, and 164 million gallons of natural gas liquids. From April to November 1992, senior managers from the Naval Petroleum and Oil Shale Reserves held a series of three workshops in Boulder, Colorado, in order to build a comprehensive Strategic Plan as required by Secretary of Energy Notice 25A-91. Other highlights are presented for the following: Naval Petroleum Reserve No. 1--production achievements, crude oil shipments to the strategic petroleum reserve, horizontal drilling, shallow oil zone gas injection project, environment and safety, and vanpool program; Naval Petroleum Reserve No. 2--new management and operating contractor and exploration drilling; Naval Petroleum Reserve No. 3--steamflood; Naval Oil Shale Reserves--protection program; and Tiger Team environmental assessment of the Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming.

  11. Characteristics of the prices of operating reserves and regulation services in competitive electricity markets

    International Nuclear Information System (INIS)

    Wang Peng; Zareipour, Hamidreza; Rosehart, William D.

    2011-01-01

    In this paper, characteristics of the prices of reserves and regulation services in the Ontario, New York and ERCOT electricity markets are studied. More specifically, price variability, price jumps, long-range correlation, and non-linearity of the prices are analyzed using the available measures in the literature. For the Ontario electricity market, the prices of 10-min spinning, 10-min non-spinning, and 30-min operating reserves for the period May 1, 2002 to December 31, 2007 are analyzed. For the New York market, prices of the same reserves plus regulation service are studied for the period February 5, 2005 to December 31, 2008. For the ERCOT market, we analyze the prices of responsive reserve, regulation up and regulation down services, for the period January 1, 2005 to December 31, 2009. The studied characteristics of operating reserve and regulation prices are also compared with those of energy prices. The findings of this paper show that the studied reserve and regulation prices feature extreme volatility, more frequent jumps and spikes, different peak price occurrence time, and lower predictability, compared to the energy prices. - Research highlights: → We examine various statistical characteristics of reserve and regulation prices. → We compare characteristics of reserve and regulation and energy prices. → Reserve and regulation prices feature different patterns from energy prices. → Reserve and regulation prices are more dispersive and volatile than energy price.

  12. United Nations Peacekeeping Operations: Challenges and Opportunities

    Science.gov (United States)

    2012-04-27

    complex amalgam of challenging interrelated multitask operations, including disarmament, demobilization and reintegration; humanitarian assistance...where UN police operated brothels and trafficked women from Eastern Europe for prostitution. 29 The most famous Prince Zeid al- Hussein’s report...submitted on March 2005, concluded that sexual exploitation of women and girl 10 by UN security personnel and civilian was significant, wide spread and

  13. Updated United Nations Framework Classification for reserves and resources of extractive industries

    Science.gov (United States)

    Ahlbrandt, T.S.; Blaise, J.R.; Blystad, P.; Kelter, D.; Gabrielyants, G.; Heiberg, S.; Martinez, A.; Ross, J.G.; Slavov, S.; Subelj, A.; Young, E.D.

    2004-01-01

    The United Nations have studied how the oil and gas resource classification developed jointly by the SPE, the World Petroleum Congress (WPC) and the American Association of Petroleum Geologists (AAPG) could be harmonized with the United Nations Framework Classification (UNFC) for Solid Fuel and Mineral Resources (1). The United Nations has continued to build on this and other works, with support from many relevant international organizations, with the objective of updating the UNFC to apply to the extractive industries. The result is the United Nations Framework Classification for Energy and Mineral Resources (2) that this paper will present. Reserves and resources are categorized with respect to three sets of criteria: ??? Economic and commercial viability ??? Field project status and feasibility ??? The level of geologic knowledge The field project status criteria are readily recognized as the ones highlighted in the SPE/WPC/AAPG classification system of 2000. The geologic criteria absorb the rich traditions that form the primary basis for the Russian classification system, and the ones used to delimit, in part, proved reserves. Economic and commercial criteria facilitate the use of the classification in general, and reflect the commercial considerations used to delimit proved reserves in particular. The classification system will help to develop a common understanding of reserves and resources for all the extractive industries and will assist: ??? International and national resources management to secure supplies; ??? Industries' management of business processes to achieve efficiency in exploration and production; and ??? An appropriate basis for documenting the value of reserves and resources in financial statements.

  14. The identification and description of the management units of the Goegap Nature Reserve

    Directory of Open Access Journals (Sweden)

    Helga Rosch

    2001-07-01

    Full Text Available Goegap Nature Reserve, near Springbok, is situated in the floral paradise of Namaqualand. This 15 000 ha reserve falls within the Namaqualand Broken Veld and in the transition zone between this Veld type and the False Succulent Karoo. Otherwise, it could be said that the reserve falls within the Upland Succulent Karoo and the transition zone between this vegetation type and the Bushmanland vegetation type. With the use of stratified aerial photographs of the reserve, random sample plots were placed within each homogeneous physiographic-physionomic unit and 284 releves were compiled in September 1998. With the use of the BBPC computer program, the resulting TWINSPAN split the data into two tables, one predominantly for the Plains and one for the Rocky Hills. After refining these tables, 13 plant communities were identified. These communities, together with the stratified aerial photographs, land type and habitat information were used to determine ten management units for the reserve. These units will be used in effective management and monitoring on the reserve. Table 1 and 2 will be uploaded as a supplementary file in due course.

  15. Integrated Ground Operations Demonstration Units Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the project is to demonstrate cost efficient cryogenic operations on a relevant scale that can be projected onto future Spaceport architectures...

  16. 21 CFR 872.6640 - Dental operative unit and accessories.

    Science.gov (United States)

    2010-04-01

    ..., and other dental devices and accessories. The device may be attached to a dental chair. (b... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Dental operative unit and accessories. 872.6640... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6640 Dental operative unit and...

  17. Sanitary Engineering Unit Operations and Unit Processes Laboratory Manual.

    Science.gov (United States)

    American Association of Professors in Sanitary Engineering.

    This manual contains a compilation of experiments in Physical Operations, Biological and Chemical Processes for various education and equipment levels. The experiments are designed to be flexible so that they can be adapted to fit the needs of a particular program. The main emphasis is on hands-on student experiences to promote understanding.…

  18. Analysis of Serbian Military Riverine Units Capability for Participation in the United Nations Peacekeeping Operations

    Directory of Open Access Journals (Sweden)

    Slobodan Radojevic

    2017-06-01

    Full Text Available This paper analyses required personnel, training capacities and equipment for participation in the United Nations peacekeeping operations with the riverine elements. In order to meet necessary capabilities for engagement in United Nations peacekeeping operations, Serbian military riverine units have to be compatible with the issued UN requirements. Serbian Armed Forces have the potential to reach such requirements with the River Flotilla as a pivot for the participation in UN missions. Serbian Military Academy adopted and developed educational and training program in accordance with the provisions and recommendations of the IMO conventions and IMO model courses. Serbian Military Academy has opportunities for education and training military riverine units for participation in the United Nations peacekeeping operations. Moreover, Serbia has Multinational Operations Training Center and Peacekeeping Operations Center certified to provide selection, training, equipping and preparations of individuals and units to the United Nations multinational operations.

  19. Operational Strategies for Predictive Dispatch of Control Reserves in View of Stochastic Generation

    DEFF Research Database (Denmark)

    Delikaraoglou, Stefanos; Heussen, Kai; Pinson, Pierre

    2014-01-01

    In view of the predictability and stochasticity of wind power generation, transmission system operators (TSOs) can benefit from predictive dispatch of slow and manual control reserves in order to maintain reactive reserve levels for unpredictable events. While scenario-based approaches...... for stochastic optimization are well suited for this problem, it appears that TSOs are hesitant in adopting this method into their practice of predictive dispatch. Differences in the formulation of constraints and cost functions, the timing and reserve product constraints influence the dispatch result...

  20. Costs of Flying Units in Air Force Active and Reserve Components

    Science.gov (United States)

    2013-01-01

    puerto Rico ANG headquarters x Radar Evaluation Squadron x Range Control Squadron x Range Squadron x Range Support Squadron x Rapid Reaction Squadron x...Within operational units, aircrews must meet frequency and currency standards for spe- cific types of sorties and events in order to maintain mission

  1. Levels of medical support for United Nations peacekeeping operations.

    Science.gov (United States)

    Seet, B

    1999-07-01

    It is important to standardize the classification of medical units in United Nations (U.N.) peacekeeping operations to ensure that they meet operational requirements and to facilitate planning and administration. It further ensures interoperability between medical facilities from different countries. The U.N. Department of Peacekeeping Operations has adopted a four-level medical support organization, with the classification level of a unit largely determined by its treatment capability and capacity. Planning and allocation of medical resources depend largely on the peacekeeping mandate, the type of peacekeeping operation, existing medical infrastructure, geographical factors, and assessed medical threats. A summary of medical units currently deployed in U.N. peacekeeping missions is presented. This should promote understanding of the U.N. medical support concept and assist national military organizations in the planning for such operations.

  2. Unit costs of waste management operations

    International Nuclear Information System (INIS)

    Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

    1994-04-01

    This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ''cradle to grave'') cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics

  3. Economic theory and the application of incentive contracts to procure operating reserves

    International Nuclear Information System (INIS)

    Wang, L.; Yu, C.W.; Wen, F.S.

    2007-01-01

    The ancillary services market plays an important role in the operation of an electricity market, especially for achieving a high level of reliability. Among all ancillary services, operating reserve is an important research focus, with the attention mainly on the optional procurement and pricing methods. These methods differ in many aspects, including the objective, allocation of risks, and feasibility. In this paper, a new approach is proposed to analyze the users' reserve procurement problem and a novel reserve trade mechanism is developed between electricity users and the retailer of the market. First, the differences between the procurement of operating reserve in decentralized and centralized ways are analyzed. The comparison of the equilibrium solutions reveals that the centralized procurement that results in a systemic optimal solution is better than the decentralized procurement that results in a Nash equilibrium solution. Furthermore, an incentive contract based on a Principal-agent model, that is able to induce a systemic optimality as well as a Pareto equilibrium and manage risks at the same time is designed. The proposed model is equitable and beneficial to all participants. An example is served to illustrate the features of the model and the methodology. (author)

  4. Analysis of operating reliability of WWER-1000 unit

    International Nuclear Information System (INIS)

    Bortlik, J.

    1985-01-01

    The nuclear power unit was divided into 33 technological units. Input data for reliability analysis were surveys of operating results obtained from the IAEA information system and certain indexes of the reliability of technological equipment determined using the Bayes formula. The missing reliability data for technological equipment were used from the basic variant. The fault tree of the WWER-1000 unit was determined for the peak event defined as the impossibility of reaching 100%, 75% and 50% of rated power. The period was observed of the nuclear power plant operation with reduced output owing to defect and the respective time needed for a repair of the equipment. The calculation of the availability of the WWER-1000 unit was made for different variant situations. Certain indexes of the operating reliability of the WWER-1000 unit which are the result of a detailed reliability analysis are tabulated for selected variants. (E.S.)

  5. Security-constrained unit commitment with flexible operating modes

    Science.gov (United States)

    Lu, Bo

    The electricity industry throughout the world, which has long been dominated by vertically integrated utilities, is facing enormous challenges. To enhance the competition in electricity industry, vertically integrated utilities are evolving into a distributed and competitive industry in which market forces drive the price of electricity and possibly reduce the net cost of supplying electrical loads through increased competition. To excel in the competition, generation companies (GENCOs) will acquire additional generating units with flexible operating capability which allows a timely response to the continuous changes in power system conditions. This dissertation considers the short-term scheduling of generating units with flexible modes of operation in security-constrained unit commitment (SCUC). Among the units considered in this study are combined cycle units, fuel switching/blending units, photovoltaic/battery system, pumped-storage units, and cascaded hydro units. The proposed security-constrained unit commitment solution will include a detailed model of transmission system which could impact the short-term scheduling of units with flexible operation modes.

  6. The United Nations and Peace Operations in El Salvador

    National Research Council Canada - National Science Library

    Reyes, Ruben

    2000-01-01

    This document presents an historical overview of the Salvadoran contra-insurgency war and the key role of the United Nations, which supported the legal framework to develop peace operations in order...

  7. Ensuring the Reliable Operation of the Power Grid: State-Based and Distributed Approaches to Scheduling Energy and Contingency Reserves

    Science.gov (United States)

    Prada, Jose Fernando

    Keeping a contingency reserve in power systems is necessary to preserve the security of real-time operations. This work studies two different approaches to the optimal allocation of energy and reserves in the day-ahead generation scheduling process. Part I presents a stochastic security-constrained unit commitment model to co-optimize energy and the locational reserves required to respond to a set of uncertain generation contingencies, using a novel state-based formulation. The model is applied in an offer-based electricity market to allocate contingency reserves throughout the power grid, in order to comply with the N-1 security criterion under transmission congestion. The objective is to minimize expected dispatch and reserve costs, together with post contingency corrective redispatch costs, modeling the probability of generation failure and associated post contingency states. The characteristics of the scheduling problem are exploited to formulate a computationally efficient method, consistent with established operational practices. We simulated the distribution of locational contingency reserves on the IEEE RTS96 system and compared the results with the conventional deterministic method. We found that assigning locational spinning reserves can guarantee an N-1 secure dispatch accounting for transmission congestion at a reasonable extra cost. The simulations also showed little value of allocating downward reserves but sizable operating savings from co-optimizing locational nonspinning reserves. Overall, the results indicate the computational tractability of the proposed method. Part II presents a distributed generation scheduling model to optimally allocate energy and spinning reserves among competing generators in a day-ahead market. The model is based on the coordination between individual generators and a market entity. The proposed method uses forecasting, augmented pricing and locational signals to induce efficient commitment of generators based on firm

  8. Initial startup and operations of Yonggwang Units 3 and 4

    International Nuclear Information System (INIS)

    Collier, T.J.; Chari, D.R.; Kiraly, F.

    1996-01-01

    A significant milestone in the nuclear power industry was achieved in 1995, when Yonggwang (YGN) Units 3 and 4 were accepted into in commercial operation by Korea Electric Power Corporation (KEPCO). YGN Unit 3 was accepted into commercial operation on March 31, 1995, the original date established during project initiation. YGN Unit 4 was accepted into operation on January 1, 1996, 3 months ahead of schedule. Each YGN unit produces approximately 1,050 Mwe and supplies approximately ten percent of the total electric power demand in the Republic of Korea (ROK). The overall plant efficiency is approximately 37% which is at least 1% higher than most nuclear units. Since achieving commercial operation, YGN Unit 3 has operated at essentially full power which has resulted in an annual performance rate in excess of 85%. YGN Unit 3 is the first of six pressurized water reactors which are currently under design and construction in the ROK and serves as the reference design for the Korean Standard Nuclear Power Plant program. Both YGN Units 3 and 4 include a System 800 Nuclear Steam Supply System (NSSS). The NSSS is rated at 2,815 Mwth and is the ABB-CE standard design. The design includes numerous advanced design features which enhance plant safety, performance and operability. A well executed startup test program was successfully completed on both units prior to commercial operation. A summary of the YGN NSSS design features, the startup test program and selected test results demonstrating the performance of those features are presented in this paper

  9. Integration of renewable generation uncertainties into stochastic unit commitment considering reserve and risk: A comparative study

    International Nuclear Information System (INIS)

    Quan, Hao; Srinivasan, Dipti; Khosravi, Abbas

    2016-01-01

    The uncertainties of renewable energy have brought great challenges to power system commitment, dispatches and reserve requirement. This paper presents a comparative study on integration of renewable generation uncertainties into SCUC (stochastic security-constrained unit commitment) considering reserve and risk. Renewable forecast uncertainties are captured by a list of PIs (prediction intervals). A new scenario generation method is proposed to generate scenarios from these PIs. Different system uncertainties are considered as scenarios in the stochastic SCUC problem formulation. Two comparative simulations with single (E1: wind only) and multiple sources of uncertainty (E2: load, wind, solar and generation outages) are investigated. Five deterministic and four stochastic case studies are performed. Different generation costs, reserve strategies and associated risks are compared under various scenarios. Demonstrated results indicate the overall costs of E2 is lower than E1 due to penetration of solar power and the associated risk in deterministic cases of E2 is higher than E1. It implies the superimposed effect of uncertainties during uncertainty integration. The results also demonstrate that power systems run a higher level of risk during peak load hours, and that stochastic models are more robust than deterministic ones. - Highlights: • An extensive comparative study for renewable integration is presented. • A novel scenario generation method is proposed. • Wind and solar uncertainties are represented by a list of prediction intervals. • Unit commitment and dispatch costs are discussed considering reserve and risk.

  10. Eielson Air Force Base Operable Unit 2 baseline risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, R.E.; Jarvis, T.T.; Jarvis, M.R.; Whelan, G.

    1994-10-01

    Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be present in groundwater wells. The data also showed an elevated level of trace metals in groundwater.

  11. Risk coordination in the computation of operating balancing reserves for wind power integration

    Energy Technology Data Exchange (ETDEWEB)

    Menemenlis, N.; Huneault, M. [IREQ, Varennes, QC (Canada); Robitaille, A. [Hydro-Quebec Production, Montreal, QC (Canada). Dir. Planification de la production eolienne, Direction generale

    2011-07-01

    Recently, with the advent of wind generation, utilities acknowledged that they must modify their operating reserve levels to mitigate the effects of the combined inherent uncertainties. In our previous work, we presented a methodology to compute balancing reserves (BRs), for the time-horizon of 1-48 hours ahead, based on a short term reliability criterion called risk. Our methodology allowed the computation of dynamic reserves but the risk target was treated as an input. It was pointed out that these reserves have an economic value. Maintaining BRs using stand-by capacity comes at a cost, which may be split into three components: a fixed cost for maintaining capacity for BRs, a variable cost when they are deployed and an opportunity costs of power not sold to maintain the reserves beyond useful levels. Here we undertake a study of the problem of establishing adequate risk targets for the computation of BRs, and consequently of determining the amount of unused power capacity that could be freed for sale on export markets. The problem is essentially formulated as an economic problem in the particular HQ context. The solution results in a trade-off between the sale revenues and the expected cost of reserves. (orig.)

  12. Feasibility study report for the 200-BP-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  13. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9x10 -5

  14. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 x 10 5

  15. Searching for a global reserves standard - The United Nations Framework Classification for Fossil Energy and Mineral Reserves and Resources 2009

    Energy Technology Data Exchange (ETDEWEB)

    Lynch-Bell, Michael

    2010-09-15

    The UNFC-2009 applies to fossil energy and mineral reserves and resources located on or below the Earth's surface and is intended to serve the needs for classification at a global level for governments, for industry and for financial reporting. UNFC-2009 is a generic system in which quantities are classified on the basis of the three fundamental criteria of economic and social viability (E), field project status and feasibility (F), and geological knowledge (G), using a numerical coding system. The aim of this paper is to explore whether the UNFC-2009 can meet the needs of all internal and external stakeholders.

  16. 200-UP-2 Operable Unit technical baseline report

    Energy Technology Data Exchange (ETDEWEB)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO{sub 3}) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO{sub 3} Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab.

  17. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  18. Preoperative Renal Functional Reserve Predicts Risk of Acute Kidney Injury After Cardiac Operation.

    Science.gov (United States)

    Husain-Syed, Faeq; Ferrari, Fiorenza; Sharma, Aashish; Danesi, Tommaso Hinna; Bezerra, Pércia; Lopez-Giacoman, Salvador; Samoni, Sara; de Cal, Massimo; Corradi, Valentina; Virzì, Grazia Maria; De Rosa, Silvia; Muciño Bermejo, María Jimena; Estremadoyro, Carla; Villa, Gianluca; Zaragoza, Jose J; Caprara, Carlotta; Brocca, Alessandra; Birk, Horst-Walter; Walmrath, Hans-Dieter; Seeger, Werner; Nalesso, Federico; Zanella, Monica; Brendolan, Alessandra; Giavarina, Davide; Salvador, Loris; Bellomo, Rinaldo; Rosner, Mitchell H; Kellum, John A; Ronco, Claudio

    2018-04-01

    Although acute kidney injury (AKI) frequently complicates cardiac operations, methods to determine AKI risk in patients without underlying kidney disease are lacking. Renal functional reserve (RFR) can be used to measure the capacity of the kidney to increase glomerular filtration rate under conditions of physiologic stress and may serve as a functional marker that assesses susceptibility to injury. We sought to determine whether preoperative RFR predicts postoperative AKI. We enrolled 110 patients with normal resting glomerular filtration rates undergoing elective cardiac operation. Preoperative RFR was measured by using a high oral protein load test. The primary end point was the ability of preoperative RFR to predict AKI within 7 days of operation. Secondary end points included the ability of a risk prediction model, including demographic and comorbidity covariates, RFR, and intraoperative variables to predict AKI, and the ability of postoperative cell cycle arrest markers at various times to predict AKI. AKI occurred in 15 patients (13.6%). Preoperative RFR was lower in patients who experienced AKI (p RFR was highly predictive of AKI. A reduced RFR appears to be a novel risk factor for AKI, and measurement of RFR preoperatively can identify patients who are likely to benefit from preventive measures or to select for use of biomarkers for early detection. Larger prospective studies to validate the use of RFR in strategies to prevent AKI are warranted. ClinicalTrials.gov identifier: NCT03092947, ISRCTN Registry: ISRCTN16109759. Copyright © 2018 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  19. Qualitative risk assessment for the 100-NR-2 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This qualitative risk assessment provides information about the 100- NR-2 Groundwater Operable Unit of the Hanford reservation. Topics discussed in this report are: data evaluation; human health risk assessment overview; ecological evaluations; summary of uncertainty; results of both the ecological and human health evaluations; toxicity assessment; risk characterization; and a summary of contaminants of potential concern

  20. Effects of Computer Reservation System in the Operations of Travel Agencies

    Directory of Open Access Journals (Sweden)

    Sevillia S. Felicen

    2016-11-01

    Full Text Available In travel industry, the main tool used is the computerized booking systems and now known as Global Distribution Systems or GDS. This paper aimed to determine the effect of using Computer Reservation System among Travel Agencies in terms of technical, human and financial aspect. This will help the Internship office to include the identified travel agencies in their linkages where the students will be deployed for internship. The result of this study will also be helpful and can be utilized in the course travel and tour operations with computer reservation system. The descriptive method of research was used with managers and users/staff of 20 travel agencies as participants of the study. Questionnaire was used as main data gathering instrument utilizing percentage, frequency and weighted mean as statistical tool. Abacus System is the computer reservation system used by all travel agencies in Batangas. All travel agencies offered services such as domestic and international hotel reservation, domestic and international ticketing and package tour. The CRS can connect guest to all forms of travel; it has installed built in system security features that can improve agency’s efficiency and productivity.

  1. Adequacy of operating reserves for power systems in future european wind power scenarios

    DEFF Research Database (Denmark)

    Das, Kaushik; Litong-Palima, Marisciel; Maule, Petr

    2015-01-01

    operating reserves. To study the effects of these imbalances, anticipated wind scenarios for European power systems are modelled for 2020 and 2030. Wind power forecasts for different time scales and real-time available wind power are modelled. Based on these studies, this paper qualitatively analyzes......Wind power generation is expected to increase in Europe by large extent in future. This will increase variability and uncertainty in power systems. Imbalances caused due to uncertainty in wind power forecast can trigger frequency instability in the system. These imbalances are handled using...... the adequacy of primary and secondary reserves requirements for future European power systems. This paper also discusses the challenges due to the uncertainty in wind power forecasts and their possible solutions for wind installation scenarios for 2020 and 2030....

  2. Planning and Operational Considerations for Units Utilizing Military Working Dogs

    Science.gov (United States)

    2009-01-01

    certain conditions and sup- port elements to maintain maximal effectiveness. To gain the maximum benefit from canine units, teams that work with dogs must...Planning and Operational Considerations for Units Utilizing Military Working Dogs 5 INTRODUCTION Military working dogs (MWDs) play an in- creasingly...take factors into consideration re- lating to canine health, handling, and safety. TRANSPORTATION AND HOUSING Transportation of dogs in the

  3. Implementation of Active Learning Method in Unit Operations II Subject

    OpenAIRE

    Ma'mun, Sholeh

    2018-01-01

    ABSTRACT: Active Learning Method which requires students to take an active role in the process of learning in the classroom has been applied in Department of Chemical Engineering, Faculty of Industrial Technology, Islamic University of Indonesia for Unit Operations II subject in the Even Semester of Academic Year 2015/2016. The purpose of implementation of the learning method is to assist students in achieving competencies associated with the Unit Operations II subject and to help in creating...

  4. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  5. Operational studies of thermal-hydraulic unit steam generators

    International Nuclear Information System (INIS)

    Shejnkman, A.G.; Bel'tyukov, A.I.; Vylomov, V.V.; Karpenko, A.I.; Lyzhin, A.A.; Smirnov, M.V.; Khaletskij, Eh.Eh.

    1989-01-01

    Results of the complex of tests, experimental studies and operational measurements of thermal-hydraulic characteristics of the PGM-200M steam generators conducted in the period of start-up and bringing-up to full capability at the BN-600 power unit are presented. Analysis of the data obtained shows that the steam generator comprising eight sections ensures heat removal at the nominal power with seven operating sections. The uniformity of coolant flow rate distribution over the steam generator sections practically does not depend on the number of operating sections

  6. Unit Operation Experiment Linking Classroom with Industrial Processing

    Science.gov (United States)

    Benson, Tracy J.; Richmond, Peyton C.; LeBlanc, Weldon

    2013-01-01

    An industrial-type distillation column, including appropriate pumps, heat exchangers, and automation, was used as a unit operations experiment to provide a link between classroom teaching and real-world applications. Students were presented with an open-ended experiment where they defined the testing parameters to solve a generalized problem. The…

  7. Adaptation of Professional Skills in the Unit Operations Laboratory

    Science.gov (United States)

    Rende, Deniz; Rende, Sevinc; Baysal, Nihat

    2012-01-01

    We introduce the design of three consecutive unit operations laboratory (UOL) courses that retain the academic rigor of the course while incorporating skills essential for professional careers, such as ability to propose ideas, develop practical solutions, participate in teamwork, meet deadlines, establish communication between technical support…

  8. modification of sequence of unit operations in mechanized palm fruit ...

    African Journals Online (AJOL)

    the observation of the traditional system prac- ticed in West Africa where the fruit and its processing technologies originated. For this reason it makes economic sense to reexam- ine and compare thoroughly, all activities in- volved in each unit operation of both the tra- ditional and mechanized palm fruit processing methods ...

  9. modification of sequence of unit operations in mechanized palm fruit

    African Journals Online (AJOL)

    MODIFICATION OF SEQUENCE OF UNIT. OPERATIONS IN MECHANIZED PALM FRUIT. PROCESSING. B.N. Nwankwojikea, A.O. Odukweb, J.C. Agunwambac a. Department of Mechanical Engineering, Michael Okpara University of Agriculture,. Umudike, Abia State, Nigeria. b. Department of Mechanical Engineering, ...

  10. The Development and Deployment of a Virtual Unit Operations Laboratory

    Science.gov (United States)

    Vaidyanath, Sreeram; Williams, Jason; Hilliard, Marcus; Wiesner, Theodore

    2007-01-01

    Computer-simulated experiments offer many benefits to engineering curricula in the areas of safety, cost, and flexibility. We report our experience in developing and deploying a computer-simulated unit operations laboratory, driven by the guiding principle of maximum fidelity to the physical lab. We find that, while the up-front investment in…

  11. An Automated Distillation Column for the Unit Operations Laboratory

    Science.gov (United States)

    Perkins, Douglas M.; Bruce, David A.; Gooding, Charles H.; Butler, Justin T.

    2005-01-01

    A batch distillation apparatus has been designed and built for use in the undergraduate unit operations laboratory course. The column is fully automated and is accompanied by data acquisition and control software. A mixture of 1­-propanol and 2-­propanol is separated in the column, using either a constant distillate rate or constant composition…

  12. Implementation and Analysis of Hemodialysis in the Unit Operations Laboratory

    Science.gov (United States)

    Madihally, Sundararajan V.; Lewis, Randy S.

    2007-01-01

    To enhance bioengineering in the chemical engineering curriculum, a Unit Operations experiment simulating the hemodialysis of creatinine was implemented. The blood toxin creatinine was used for developing a more realistic dialysis experiment. A dialysis model is presented that allows students to assess the validity of model assumptions. This work…

  13. Community-Based Presentations in the Unit Operations Laboratory

    Science.gov (United States)

    Mitchell, Brian S.; Law, Victor J.

    2005-01-01

    A method for incorporating community­-based oral presentations into the undergraduate chemical engineering unit operations laboratory experience is described. Examples are given of appropriate topics and how these presentations can be incorporated into the experiment sequence. Course evaluations reflect the fact that these presentations are an…

  14. Semiconductor Chemical Reactor Engineering and Photovoltaic Unit Operations.

    Science.gov (United States)

    Russell, T. W. F.

    1985-01-01

    Discusses the nature of semiconductor chemical reactor engineering, illustrating the application of this engineering with research in physical vapor deposition of cadmium sulfide at both the laboratory and unit operations scale and chemical vapor deposition of amorphous silicon at the laboratory scale. (JN)

  15. Biomass publications of the forest operations research unit: A synthesis

    Science.gov (United States)

    Dana Mitchell; Renee Ayala; [Compilers

    2005-01-01

    The Forest Operations Unit of the Southern Research Station has been studying biomass-related topics since 1977. This CD aids the reader by organizing these publications in one easy-to-use CD. This CD is comprised of an executive summary, two bibliographies, individual publications (in PDF format), and a keyword listing. The types of publications included on this CD...

  16. Pressure Swing Adsorption in the Unit Operations Laboratory

    Science.gov (United States)

    Ganley, Jason

    2018-01-01

    This paper describes a student laboratory in the Unit Operations Laboratory at the Colorado School of Mines: air separation by pressure swing adsorption. The flexibility of the system enables students to study the production of enriched nitrogen or oxygen streams. Automatic data acquisition permits the study of cycle steps and performance.…

  17. Thunderstorm Algorithm for Determining Unit Commitment in Power System Operation

    Directory of Open Access Journals (Sweden)

    Arif Nur Afandi

    2016-12-01

    Full Text Available Solving the unit commitment problem is an important task in power system operation for deciding a balanced power production between various types of generating units under technical constraints and environmental limitations. This paper presents a new intelligent computation method, called the Thunderstorm Algorithm (TA, for searching the optimal solution of the integrated economic and emission dispatch (IEED problem as the operational assessment for determining unit commitment. A simulation using the IEEE-62 bus system showed that TA has smooth convergence and is applicable for solving the IEED problem. The IEED’s solution is associated with the total fuel consumption and pollutant emission. The proposed TA method seems to be a viable new approach for finding the optimal solution of the IEED problem.

  18. Operational Research to Improve HIV Prevention in the United States

    Science.gov (United States)

    Herbst, Jeffrey H.; Glassman, Marlene; Carey, James W.; Painter, Thomas M.; Gelaude, Deborah J.; Fasula, Amy M.; Raiford, Jerris L.; Freeman, Arin E.; Harshbarger, Camilla; Viall, Abigail H.; Purcell, David W.

    2015-01-01

    The HIV/AIDS epidemic in the United States continues despite several recent noteworthy advances in HIV prevention. Contemporary approaches to HIV prevention involve implementing combinations of biomedical, behavioral, and structural interventions in novel ways to achieve high levels of impact on the epidemic. Methods are needed to develop optimal combinations of approaches for improving efficiency, effectiveness, and scalability. This article argues that operational research offers promise as a valuable tool for addressing these issues. We define operational research relative to domestic HIV prevention, identify and illustrate how operational research can improve HIV prevention, and pose a series of questions to guide future operational research. Operational research can help achieve national HIV prevention goals of reducing new infections, improving access to care and optimization of health outcomes of people living with HIV, and reducing HIV-related health disparities. PMID:22217681

  19. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  20. The United Nations framework classification for fossil energy and mineral reserves and resources 2009

    Science.gov (United States)

    MacDonald, D.; Lynch-Bell, M.; Ross, J.; Heiberg, S.; Griffiths, C.; Klett, T.

    2011-01-01

    Effective resource management in a globalizing economy requires accurate assessments of fossil energy and minerals resources. The recoverable quantities must be described and categorized in a manner that is consistent with scientific and social/economic information describing the economy as well as with the information describing the projects to recover them. A number of different standards have evolved over time in response to various professional needs Under a mandate given by the United Nations Economic and Social Council, the United Nations Economic Commission for Europe (UNECE) has cooperated with Governments, regulatory agencies, industry, international organizations, and professional organizations (including Committee for Mineral Reserves International Reporting Standards (CRIRSCO), the Society of Petroleum Engineers (SPE), the American Association of Petroleum Geologists (AAPG), and the Society of Petroleum Evaluation Engineers (SPEE)), as well as with outstanding experts, to define a global classification for extractive activities (including oil, gas, heavy oil and bitumen extraction) that reflects the principal concerns of existing petroleum and mineral classifications. The United Nations Framework Classification for Fossil Energy and Mineral Reserves and Resources-2009 (UNFC-2009) aims to serve the following four principal needs: 1. The needs in international energy and mineral studies to formulate robust and long-sighted policies. 2. The needs of governments in managing their resources accordingly, allowing market prices to be transferred to the wellhead with as little loss as possible. 3. The industries' needs for information while deploying technology, management and finance to secure energy supplies and capture value efficiently within the established frameworks to serve its host countries, shareholders and stakeholders. 4. The financial community's need for information to allocate capital appropriately, providing reduced costs and improved long

  1. Greenhouse gas emissions from operating reserves used to backup large-scale wind power.

    Science.gov (United States)

    Fripp, Matthias

    2011-11-01

    Wind farms provide electricity with no direct emissions. However, their output cannot be forecasted perfectly, even a short time ahead. Consequently, power systems with large amounts of wind power may need to keep extra fossil-fired generators turned on and ready to provide power if wind farm output drops unexpectedly. In this work, I introduce a new model for estimating the uncertainty in short-term wind power forecasts, and how this uncertainty varies as wind power is aggregated over larger regions. I then use this model to estimate the reserve requirements in order to compensate for wind forecast errors to a 99.999% level of reliability, and an upper limit on the amount of carbon dioxide that would be emitted if natural gas power plants are used for this purpose. I find that for regions larger than 500 km across, operating reserves will undo 6% or less of the greenhouse gas emission savings that would otherwise be expected from wind power.

  2. Advanced Transport Operating System (ATOPS) control display unit software description

    Science.gov (United States)

    Slominski, Christopher J.; Parks, Mark A.; Debure, Kelly R.; Heaphy, William J.

    1992-01-01

    The software created for the Control Display Units (CDUs), used for the Advanced Transport Operating Systems (ATOPS) project, on the Transport Systems Research Vehicle (TSRV) is described. Module descriptions are presented in a standardized format which contains module purpose, calling sequence, a detailed description, and global references. The global reference section includes subroutines, functions, and common variables referenced by a particular module. The CDUs, one for the pilot and one for the copilot, are used for flight management purposes. Operations performed with the CDU affects the aircraft's guidance, navigation, and display software.

  3. American nurses' work autonomy on patient care and unit operations.

    Science.gov (United States)

    Mrayyan, Majd T

    Work autonomy is an essential aspect of nurses' professional lives. The aim of this research was to study American nurses' work autonomy and, in particular, autonomy over patient care and unit operations decisions. Data were collected electronically during July of 2004. A total of 300 American nurses were recruited from two clinical listserves in which nurses communicate electronically as a group. Nurses were more autonomous about decisions relating to patient care than unit operations, and their total work autonomy was moderate. Correlations and stepwise regression analyses revealed that nurses' experience, education, and time commitments influenced their work autonomy. Findings suggest that nurses' work autonomy should be enhanced to reach its full potential and that nurse administrators should promote their nurses' work autonomy.

  4. Stability Analysis for Operation of DG Units in Smart Grids

    DEFF Research Database (Denmark)

    Pouresmaeil, Edris; Shaker, Hamid Reza; Mehrasa, Majid

    2015-01-01

    This paper presents a multifunction control strategy for the stable operation of Distributed Generation (DG) units during grid integration. The proposed control model is based on Direct Lyapunov Control (DLC) theory and provides a stable region for the appropriate operation of DG units during grid...... integration. Using DLC technique in DG technology can provide the continuous injection of maximum active power in fundamental frequency from the DG source to the grid, compensating all reactive power and harmonic current components of grid-connected loads through the integration of DG link into the grid....... Application of this concept can guarantee to reduce the stress on the grid during the energy demand peak. Simulation results are presented to demonstrate the proficiency and performance of the proposed DLC technique in DG technology....

  5. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    International Nuclear Information System (INIS)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-01-01

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed

  6. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-05-22

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

  7. [Operational units for health risk management (patient safety)].

    Science.gov (United States)

    Pardo Hernández, A; Claveria Fontán, A; García Urbaneja, M; López Barba, J

    2008-12-01

    In 1995 INSALUD began to develop performance measures in the field of risk management, and following transfer of powers to the regions, these led to the development of operational units in individual healthcare centres. These units, which consist of a group of health professionals, including managers, aim to identify, evaluate, analyse and deal with health risks, to enhance patient safety. Their organisational structure can vary in accordance with the needs, resources and philosophy of each individual organisation. This paper presents the experience of the risk management units developed in four Spanish regions: Madrid, the Basque Country, Galicia and INGESA (Ceuta and Melilla). It also includes reflections on assessment of their impact and on their future role in improving safety in healthcare services.

  8. Licensed operating reactors. Operating units status report, data as of 2-28-79

    International Nuclear Information System (INIS)

    1979-03-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices and IE Headquarters; and the third section is an appendix containing comparative statistics of U.S. nuclear/fossil capacity, identification of nuclear power plants within regional Electric Reliability Councils, the relative status of U.S. nuclear electric production to all U.S. electric production by state, and selected Edison Electric Institute operating statistics. Throughout the report, statistical factors for periods greater than a report month, or for more than one unit, are computed as the arithmetic average of each unit's individual operating statistics. The statistical factors for each unit for the report month are computed from actual power production for the month. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data is checked for consistency with previously submitted statistics

  9. Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-10-01

    This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

  10. Laws and regulations of laser operation in the United States.

    Science.gov (United States)

    DiGiorgio, Catherine M; Avram, Mathew M

    2018-02-05

    The laws and regulations governing laser operation in the United States are vague, complex, and vary state-to-state. The objective of this study is to present an overview of the laws and regulations of laser operation in each of the 50 states. We performed an extensive online search of the law in each of the 50 states by examining multiple state cosmetology boards, state legislative boards, state nursing boards, and state medical boards. Laser regulations are best divided into three categories: delegation, supervision, and operation. Our findings demonstrate the complicated nature of the regulations covering this issue and identify a lack of regulation in numerous states. Lasers Surg. Med. © 2018 Wiley Periodicals, Inc. © 2018 Wiley Periodicals, Inc.

  11. Short-term Operating Strategy with Consideration of Load Forecast and Generating Unit Uncertainty

    Science.gov (United States)

    Sarjiya; Eua-Arporn, Bundhit; Yokoyama, Akihiko

    One of the common problems faced by many electric utilities concernes with the uncertainty from both load forecast error and generating unit unavailability. This uncertainty might lead to uneconomic operation if it is not managed properly in the planning stage. Utilities may have many operational tools, e.g. unit commitment, economic dispatch. However, they require a proper operating strategy, taking into account uncertainties. This paper explicitly demonstrates how to include the uncertainties to obtain the best operating strategy for any power systems. The uncertainty of the load forecast is handled using decision analysis method, meanwhile the uncertainty of the generating unit is approached by inclusion of risk cost to the total cost. In addition, three spinning reserve strategies based on deterministic criteria are incorporated in the development of scenario. Meanwhile, Mixed Integer Linear Programming method is utilized to generate unit commitment decision in each created scenario. The best strategy which gives the minimum total cost is selected among the developed scenarios. The proposed method has been tested using a modified of IEEE 24-bus system. Sensitivity analysis with respect to the number of unit, expected unserved energy price, standard deviation of load forecast, and probability of load level is reported.

  12. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Vukelich, S.E. [Golder Associates, Inc., Richland, WA (United States)

    1994-09-22

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River.

  13. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    International Nuclear Information System (INIS)

    Vukelich, S.E.

    1994-01-01

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River

  14. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  15. The quality of operative notes at a general surgery unit.

    Science.gov (United States)

    Rogers, A; Bunting, M; Atherstone, A

    2008-09-01

    With the increasingly litigious nature of medical practice, accurate documentation is critical. This is particularly true for operative procedures, and medical councils have identified this and published guidelines to aid surgeons. However, these remain a frequently cited weakness in their defence in medico-legal cases. This study assessed the accuracy of operative notes in a general surgery unit in order to improve our practice. An audit of 100 consecutive operative notes was performed, and notes were assessed using the Royal College of Surgeons guidelines. The quality of note-taking of trainees was compared with that of consultant surgeons. A series of operation note pro formas was designed in response to the findings. Of the notes, 66% were completed by trainees. The vast majority of notes had no diagram to demonstrate the surgical findings or illustrate the actions. Specialist surgeons were more likely to describe the actions accurately, but less likely to describe wound closure methods or dressings used. They were also less likely to complete adequate postoperative orders. This study identifies key areas of weakness in our operative note-keeping. Pro formas should be introduced and made available for commonly performed procedures, and diagrams should be used wherever possible.

  16. Post-Operative Intensive Care Unit Requirements Following Elective Craniotomy

    Science.gov (United States)

    HANAK, BRIAN W.; WALCOTT, BRIAN P.; NAHED, BRIAN V.; MUZIKANSKY, ALONA; MIAN, MATTHEW K.; KIMBERLY, WILLIAM T.; CURRY, WILLIAM T.

    2012-01-01

    Objective Commonly, patients undergoing craniotomy are admitted to an intensive care setting post-operatively to allow for close monitoring. We aim to determine the frequency with which patients who have undergone elective craniotomies require intensive care unit level interventions or experience significant complications during the post-operative period to identify a subset of patients for whom an alternative to ICU level care may be appropriate. Methods Following Institutional Review Board approval, a prospective, consecutive cohort of adult patients undergoing elective craniotomy was established at the Massachusetts General Hospital between the dates of April 2010 and March 2011. Inclusion criteria were intradural operations requiring craniotomy performed on adults (18 years of age or greater). Exclusion criteria were cases of an urgent or emergent nature, patients who remained intubated post-operatively, and patients who had a ventriculostomy drain in place at the conclusion of the case. Results 400 patients were analyzed. Univariate analysis revealed that diabetics (p = 0.00047), patients who required intra-operative blood product administration (p = 0.032), older patients (p craniotomy. Properly selected patients may not require post-craniotomy ICU monitoring. Further study of resource utilization is necessary to validate these preliminary findings, particularly in different hospital types. PMID:23182731

  17. The United States national volcanic ash operations plan for aviation

    Science.gov (United States)

    Albersheim, Steven; Guffanti, Marianne

    2009-01-01

    Volcanic-ash clouds are a known hazard to aviation, requiring that aircraft be warned away from ash-contaminated airspace. The exposure of aviation to potential hazards from volcanoes in the United States is significant. In support of existing interagency operations to detect and track volcanic-ash clouds, the United States has prepared a National Volcanic Ash Operations Plan for Aviation to strengthen the warning process in its airspace. The US National Plan documents the responsibilities, communication protocols, and prescribed hazard messages of the Federal Aviation Administration, National Oceanic and Atmospheric Administration, US Geological Survey, and Air Force Weather Agency. The plan introduces a new message format, a Volcano Observatory Notice for Aviation, to provide clear, concise information about volcanic activity, including precursory unrest, to air-traffic controllers (for use in Notices to Airmen) and other aviation users. The plan is online at http://www.ofcm.gov/p35-nvaopa/pdf/FCM-P35-2007-NVAOPA.pdf. While the plan provides general operational practices, it remains the responsibility of the federal agencies involved to implement the described procedures through orders, directives, etc. Since the plan mirrors global guidelines of the International Civil Aviation Organization, it also provides an example that could be adapted by other countries.

  18. Training operators of VVER-1000 units in Eastern Europe

    International Nuclear Information System (INIS)

    Normand, X.; Nabet, E.; Hauesberger, P.

    1996-01-01

    The VVER 1000 is the most recent nuclear reactor designed in the former Soviet Union. Its design and operation principles are close to Western four-loop reactors in the 1000- to 1500-MW class; therefore, the Western simulation technology is usually directly applicable to the simulation of these units. Moreover, the current number of state-of-the-art training simulators in operation is very limited. A total of 19 units are in operation, while only 2 modern simulators are available (full-scope type) in Balakovo and Zaporozhe. Access to these simulators is practically limited to the respective plants' trainees, which means that the other units have to be satisfied with hands-on training. Facing this situation and taking into account the predicted lifetime of these plants (15 to 25 yr to go, maybe more), a lot of effort has been made in recent years to provide the plants with modern simulators. The major hurdles to this action were obviously financial and technical (availability of codes, computers, software tools). Today, one full-scope project (Kalinin) is almost complete, and three have been announced (Novovoronezh, Khmelnitsky, Kozloduy). Full-scope simulators are clearly the ultimate target of a concerned power plants. However, all users do realize the advantages of the complementary approach with compact simulators: 1. They can be available quickly for starting the training process. 2. They cover a training field that is not (or partly) addressed by full-scope simulators, i.e., the demonstration of physical phenomena in normal and accidental situations

  19. Article separation apparatus and method for unit operations

    Science.gov (United States)

    Pardini, Allan F.; Gervais, Kevin L.; Mathews, Royce A.; Hockey, Ronald L.

    2010-06-22

    An apparatus and method are disclosed for separating articles from a group of articles. The apparatus includes a container for containing one or more articles coupled to a suitable fluidizer for suspending articles within the container and transporting articles to an induction tube. A portal in the induction tube introduces articles singly into the induction tube. A vacuum pulls articles through the induction tube separating the articles from the group of articles in the container. The apparatus and method can be combined with one or more unit operations or modules, e.g., for inspecting articles, assessing quality of articles, or ascertaining material properties and/or parameters of articles, including layers thereof.

  20. Feasibility Study for Operable Unit 7-13/14

    Energy Technology Data Exchange (ETDEWEB)

    K. Jean Holdren

    2007-05-29

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

  1. Feasibility Study for Operable Unit 7-13/14

    International Nuclear Information System (INIS)

    K. Jean Holdren Thomas E. Bechtold Brian D. Preussner

    2007-01-01

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision

  2. Risk-based decision analysis for groundwater operable units

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1995-01-01

    This document proposes a streamlined approach and methodology for performing risk assessment in support of interim remedial measure (IRM) decisions involving the remediation of contaminated groundwater on the Hanford Site. This methodology, referred to as ''risk-based decision analysis,'' also supports the specification of target cleanup volumes and provides a basis for design and operation of the groundwater remedies. The risk-based decision analysis can be completed within a short time frame and concisely documented. The risk-based decision analysis is more versatile than the qualitative risk assessment (QRA), because it not only supports the need for IRMs, but also provides criteria for defining the success of the IRMs and provides the risk-basis for decisions on final remedies. For these reasons, it is proposed that, for groundwater operable units, the risk-based decision analysis should replace the more elaborate, costly, and time-consuming QRA

  3. Predictive Control of Demand Side Units Participating in the Primary Frequency Reserve Market

    DEFF Research Database (Denmark)

    Biegel, Benjamin; Stoustrup, Jakob; Andersen, Palle

    2013-01-01

    We consider an aggregator controlling a mixed portfolio of conventional power generators and demand side units. The generators are controllable within certain power and ramp limitations while the demand side units are characterized by flexible consumptions and therefore can be treated as energy...

  4. Documentation of the demonstrated reserve base of coal in the United States. Volume 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Herhal, A J; Britton, S G; Minnucci, C A

    1982-03-01

    The purpose of this report is to document the methodologies used to develop the 1979 Demonstrated Reserve Base (DRB) of coal. The main body of this report summarizes the methodological procedures used to develop each state reserve estimate. The appendices to the report provide a detailed description of the entire DRB process for each state.

  5. The United States Marine Corps Reserve: Reorganization for an Integrated Force

    Science.gov (United States)

    2015-04-28

    Reserve: A Policy and Historical Context and the Way Forward, Joint Forces Quarterly, 59, (4th quarter 2010),15. http://www.army.mil/ article /45817...Wadsworth Cengage Learning, 2010. Garcia, Federico E. and David L. Reese. Monetary Incentives in the Selected Marine Corps Reserve. Crm . Vol. 96

  6. Assessing the Potential for Using Reserves in Operations Other Than War

    National Research Council Canada - National Science Library

    Brown, Roger

    1997-01-01

    ... superpower. Its new status conferred on it new responsibilities, including requirements to lead and participate in global operations that require military forces but do not involve armed conflict...

  7. An analysis of post-traumatic stress symptoms in United States Air Force drone operators.

    Science.gov (United States)

    Chappelle, Wayne; Goodman, Tanya; Reardon, Laura; Thompson, William

    2014-06-01

    Remotely piloted aircraft (RPA), commonly referred to as "drones," have emerged over the past decade as an innovative warfighting tool. Given there is a paucity of empirical research assessing drone operators, the purpose of this study was to assess for the prevalence of PTSD symptoms among this cohort. Of the 1084 United States Air Force (USAF) drone operators that participated, a total of 4.3% endorsed a pattern of symptoms of moderate to extreme level of severity meeting criteria outlined in the Diagnostic and Statistical Manual of Mental Disorders-4th edition. The incidence of PTSD among USAF drone operators in this study was lower than rates of PTSD (10-18%) among military personnel returning from deployment but higher than incidence rates (less than 1%) of USAF drone operators reported in electronic medical records. Although low PTSD rates may be promising, limitations to this study are discussed. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. Operation of N Reactor and Fuels Fabrication Facilities, Hanford Reservation, Richland, Benton County, Washington: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1980-08-01

    Environmental data, calculations and analyses show no significant adverse radiological or nonradiological impacts from current or projected future operations resulting from N Reactor, Fuels Fabrication and Spent Fuel Storage Facilities. Nonoccupational radiation exposures resulting from 1978 N Reactor operations are summarized and compared to allowable exposure limits.

  9. Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1993

    International Nuclear Information System (INIS)

    1993-01-01

    During fiscal year 1993, the reserves generated $440 million in revenues, a $33 million decrease from the fiscal year 1992 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $207 million, resulting in net cash flow of $233 million, compared with $273 million in fiscal year 1992. From 1976 through fiscal year 1993, the Naval Petroleum and Oil Shale Reserves generated $15.7 billion in revenues for the US Treasury, with expenses of $2.9 billion. The net revenues of $12.8 billion represent a return on costs of 441 percent. See figures 2, 3, and 4. In fiscal year 1993, production at the Naval Petroleum and Oil Shale Reserves at maximum efficient rates yielded 25 million barrels of crude oil, 123 billion cubic feet of natural gas, and 158 million gallons of natural gas liquids. The Naval Petroleum and Oil Shale Reserves has embarked on an effort to identify additional hydrocarbon resources on the reserves for future production. In 1993, in cooperation with the US Geological Survey, the Department initiated a project to assess the oil and gas potential of the program's oil shale reserves, which remain largely unexplored. These reserves, which total a land area of more than 145,000 acres and are located in Colorado and Utah, are favorably situated in oil and gas producing regions and are likely to contain significant hydrocarbon deposits. Alternatively the producing assets may be sold or leased if that will produce the most value. This task will continue through the first quarter of fiscal year 1994

  10. Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, B.-M.; Lew, D.; Milligan, M.

    2011-07-01

    This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

  11. Operation of the radioactive acid digestion test unit

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1980-01-01

    The Radioactive Acid Digestion Test Unit (RADTU) has been constructed at Hanford to demonstrate the application of the Acid Digestion Process for treating combustible transuranic wastes and scrap materials. The RADTU with its original tray digestion vessel has recently completed a six-month campaign processing potentially contaminated nonglovebox wastes from a Hanford plutonium facility. During this campaign, it processed 2100 kg of largely cellulosic wastes at an average sustained processing rate of 3 kg/h as limited by the water boiloff rate from the acid feeds. The on-line operating efficiency was nearly 50% on a twelve hour/day, five day/week basis. Following this campaign, a new annular high rate digester has been installed for testing. In preliminary tests with simulated wastes, the new digester demonstrated a sustained capacity of 10 kg/h with greatly improved intimacy of contact between the digestion acid and the waste. The new design also doubles the heat transfer surface, which with reduced heat loss area, is expected to provide at least three times the water boiloff rate of the previous tray digester design. Following shakedown testing with simulated and low-level wastes, the new unit will be used to process combustible plutonium scrap and waste from Hanford plutonium facilities for the purposes of volume reduction, plutonium recovery, and stabilization of the final waste form

  12. Diverse characteristics of wetlands restored under the Wetlands Reserve Program in the Southeastern United States

    Science.gov (United States)

    Diane De Steven; Joel M. Gramling

    2012-01-01

    The Wetlands Reserve Program (WRP) restores converted or degraded wetlands on private working lands; however, the nature and outcomes of such efforts are undocumented in the Southeastern U.S. Identification of wetland types is needed to assess the program's conservation benefits, because ecological functions differ with hydrogeomorphic (HGM) type. We reviewed...

  13. Applied Meteorology Unit - Operational Contributions to Spaceport Canaveral

    Science.gov (United States)

    Bauman, William H., III; Roeder, William P.; Lafosse, Richard A.; Sharp, David W.; Merceret, Francis J.

    2004-01-01

    The Applied Meteorology Unit (AMU) provides technology development, evaluation and transition services to improve operational weather support to the Space Shuttle and the National Space Program. It is established under a Memorandum of Understanding among NASA, the Air Force and the National .Weather Service (NWS). The AMU is funded and managed by NASA and operated by ENSCO, Inc. through a competitively awarded NASA contract. The primary customers are the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS), FL; the Spaceflight Meteorology Group (SMG) at Johnson Space Center (JSC) in Houston, TX; and the NWS office in Melbourne, FL (NWS MLB). This paper will briefly review the AMU's history and describe the three processes through which its work is assigned. Since its inception in 1991 the AMU has completed 72 projects, all of which are listed at the end of this paper. At least one project that highlights each of the three tasking processes will be briefly reviewed. Some of the projects that have been especially beneficial to the space program will also be discussed in more detail, as will projects that developed significant new techniques or science in applied meteorology.

  14. Predicting U.S. Army Reserve Unit Manning Using Market Demographics

    Science.gov (United States)

    2015-06-01

    One should always procrastinate on one’s thesis to surprise the kids at the beach. Next, I would like to thank my thesis team, Professor Sam...hand (S-Level), equipment readiness/serviceability (R- Level), and unit training (T-Level), each measured on a one to four scale using sub-level...converted them to a scale from 0 to 10. Based on their relative importance, each measure received a weighting that allowed for the generation of an

  15. Enhanced Teaching and Student Learning through a Simulator-Based Course in Chemical Unit Operations Design

    Science.gov (United States)

    Ghasem, Nayef

    2016-01-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes…

  16. Should the United States Marine Corps Refine Its System of Active Component Enlisted Recruitment in Order to Target the Needs of Select Marine Corps Reserve Units?

    Science.gov (United States)

    2012-03-23

    on its investment by not establishing a connection between the AC recruiting missions and the needs of the proximal reserve units. By establishing this...which encourages the continuum of service. The end result of this transition is an opportunity to better meet the needs of the AC and the RC, while

  17. Variable-Speed Wind Power Plant Operating With Reserve Power Capability: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Singh, M.; Gevorgian, V.; Muljadi, E.; Ela, E.

    2013-10-01

    As the level of wind penetration increases, wind turbine technology must move from merely generating power from wind to taking a role in supporting the bulk power system. Wind turbines should have the capability to provide inertial response and primary frequency (governor) response. Wind turbine generators with this capability can support the frequency stability of the grid. To provide governorresponse, wind turbines should be able to generate less power than the available wind power and hold the rest in reserves, ready to be accessed as needed. In this paper, we explore several ways to control wind turbine output to enable reserve-holding capability. The focus of this paper is on doubly-fed induction generator (also known as Type 3) and full-converter (also known as Type 4) windturbines.

  18. Long Term Operation in the United States – Subsequent License Renewal for Plant Operation Beyond 60 Years

    International Nuclear Information System (INIS)

    Johnson, M.

    2016-01-01

    To date, renewed operating licenses have been issued for 78 of the operating nuclear power plant units in the United States of America (USA), enabling these plants to operate for up to 60 years. License renewal applications for another 14 units are currently under review. With 38 of these units in the operating period beyond 40 years, there is growing interest by the industry for subsequent license renewal, wherein plants would be relicensed to operate for an additional 20-year period, out to 80 years. The NRC is currently evaluating technical issues for 80 years of plant operation, to enable development of guidance documents such as a Generic Aging Lessons Learned Report and a Standard Review Plan that would apply to subsequent license renewal. This paper describes the status of license renewal in the USA, including the prognosis for plant operation out to 80 years. (author)

  19. Enhancement of operating flux in a membrane bio-reactor coupled with a mechanical sieve unit.

    Science.gov (United States)

    Park, Seongjun; Yeon, Kyung-Min; Moon, Seheum; Kim, Jong-Oh

    2018-01-01

    Filtration flux is one of the key factors in regulating the performance of membrane bio-reactors (MBRs) for wastewater treatment. In this study, we explore the effectiveness of a mechanical sieve unit for effective flux enhancement through retardation of the fouling effect in a modified MBR system (SiMBR). In brief, the coarse sieve unit having 100 μm and 50 μm permits small size microorganism flocs to adjust the biomass concentration from the suspended basin to the membrane basin. As a result, the reduced biofouling effect due to the lowered biomass concentration from 7800 mg/L to 2400 mg/L, enables higher flux through the membrane. Biomass rejection rate of the sieve is identified to be the crucial design parameter for the flux enhancement through the incorporation of numerical simulations and operating critical-flux measurement in a batch reactor. Then, the sieve unit is prepared for 10 L lab-scale continuous SiMBR based on the correlation between sieve pore size and biomass rejection characteristics. During continuous operation of lab-scale SiMBR, biomass concentration is maintained with a higher biomass concentration in the aerobic basin (7400 mg/L) than that in the membrane basin (2400 mg/L). In addition, the SiMBR operations are conducted using three different commercial hollow fiber membranes to compare the permeability to that of conventional MBR operations. For all cases, the modified MBR having a sieve unit clearly results in enhanced permeability. These results successfully validate that SiMBR can effectively improve flux through direct reduction of biomass concentration. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. Computation of dynamic operating balancing reserve for wind power integration for the time-horizon 1-48 hours

    Energy Technology Data Exchange (ETDEWEB)

    Menemenlis, N.; Huneault, M. [IREQ, Varennes, QC (Canada); Robitaille, A. [Hydro-Quebec Production, Dir. Planification de la production eolienne, Direction Generale, Montreal, QC (Canada)

    2010-07-01

    Integrating wind power into the operations-planning horizon of 1 to 48 hours ahead, a challenge facing utilities is how to cope with wind forecast uncertainties, in addition to existing inherent uncertainties of load forecast errors and unavailability of generation. Utilities counter forecast uncertainties by maintaining operational reserves to ensure a high level of reliability to the system. With the advent of wind generation, additional reserves are required to cover the incremental uncertainties. In this paper, we fine tune a methodology for calculating additional balancing reserves which had reproduced accurately only an average scenario. Here, several wind forecast errors distributions are introduced corresponding to different wind forecast levels. These distributions are approximated by gamma-like distributions with time-varying parameters. The results show that modeling uncertainties as a function of wind generation levels impacts significantly the balancing reserves and associated risk, and justifies the necessity to veer towards a dynamic computation of dynamic balancing reserves that consider the imminent wind generation forecast. (orig.)

  1. Estimates of hydraulic fracturing (Frac) sand production, consumption, and reserves in the United States

    Science.gov (United States)

    Bleiwas, Donald I.

    2015-01-01

    The practice of fracturing reservoir rock in the United States as a method to increase the flow of oil and gas from wells has a relatively long history and can be traced back to 1858 in Fredonia, New York, when a gas well situated in shale of the Marcellus Formation was successfully fractured using black powder as a blasting agent. Nearly all domestic hydraulic fracturing, often referred to as hydrofracking or fracking, is a process where fluids are injected under high pressure through perforations in the horizontal portion of a well casing in order to generate fractures in reservoir rock with low permeability (“tight”). Because the fractures are in contact with the well bore they can serve as pathways for the recovery of gas and oil. To prevent the fractures generated by the fracking process from closing or becoming obstructed with debris, material termed “proppant,” most commonly high-silica sand, is injected along with water-rich fluids to maintain or “prop” open the fractures. The first commercial application of fracking in the oil and gas industry took place in Oklahoma and Texas during the 1940s. In 1949, over 300 wells, mostly vertical, were fracked (ALL Consulting, LLC, 2012; McGee, 2012; Veil, 2012) and used silica sand as a proppant (Fracline, 2011). The resulting increase in well productivity demonstrated the significant potential that fracking might have for the oil and gas industry.

  2. Unit testing, model validation, and biological simulation [version 1; referees: 2 approved, 1 approved with reservations

    Directory of Open Access Journals (Sweden)

    Gopal P. Sarma

    2016-08-01

    Full Text Available The growth of the software industry has gone hand in hand with the development of tools and cultural practices for ensuring the reliability of complex pieces of software. These tools and practices are now acknowledged to be essential to the management of modern software. As computational models and methods have become increasingly common in the biological sciences, it is important to examine how these practices can accelerate biological software development and improve research quality. In this article, we give a focused case study of our experience with the practices of unit testing and test-driven development in OpenWorm, an open-science project aimed at modeling Caenorhabditis elegans. We identify and discuss the challenges of incorporating test-driven development into a heterogeneous, data-driven project, as well as the role of model validation tests, a category of tests unique to software which expresses scientific models.

  3. Unit commitment problem of thermal generation units for short term operational planning using simple genetic algorithm

    International Nuclear Information System (INIS)

    Ahmad, A.; Malik, T.N.; Ahmad, A.

    2006-01-01

    Unit Commitment problem plays a major role in power system since the improved UC schedules may save the electric utilities millions of dollars per year in production cost. The objective of the optimal commitment is to determine the on/off states of the units in the system to meet the load requirement and spinning reserve requirement at each time period such that the overall cost of generation is minimum, while satisfying various constraints. Several research have been done in this field for the past three decades. With the development of modern power system, it is not practical to use the classical approaches to solve large scale UC problem. Due to the limitations of the mathematical programming methods. Al based techniques are used GA is an adaptive search method for optimal or near optimal commitment order. GA can get a sub-optimal solution that is very close to the global optimal solution and can meet the demand of engineering application. A GA implementation using the standard reproduction. cross over and mutation has been used to get optimal solution. The approach of UC using GA consists of repeating the process of economic dispatch and minimizing the objective function for various unit combinations and over a population of feasible solution. UC solution based on GA has been programmed/ implemented in C++. The performance of GA approach is initially tested as a case study for 3-generator system and for a load pattern of 24 hours. This paper applies the GA to the UC scheduling problem and illustrates details of the performance of genetic algorithm. The aim of this paper is to propose the suitability of a new approach to the solution of the UC problem. (author)

  4. Operator support system for power unit control in abnormal modes of operation

    International Nuclear Information System (INIS)

    Kurka, J.

    1993-01-01

    I and C system technology, partly Soviet and partly Czechoslovakian, used on the NPP Dukovany units represents the control technology standard of late 70-ties and it becomes the weak part of the whole system. The modernization of the system, therefore, is necessary and it is already in preparation. The specification of both the scope and the depth of upgrading/replacement is being carried out within the framework of the PHARE program. The second phase of the program aimed at the final specifications of requirements on new I and C system is in progress. The output will serve as detailed specification for bid invitation for control system supplier. Parallely, the preparation of specification for WWER-440 full-scope plant simulator for operator training is in progress as well. In the case of two units with WWER-1000 MW reactors, the completion of construction of which was even threaten for a certain period of time, essential changes have taken place in the design of both the I and C systems and the reactor core. 7 figs

  5. 2016 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2017-10-01

    This publication highlights data collected by the 2016 NCFO. The Bureau of Transportation Statistics (BTS) conducted the NCFO from April through November 2016, collecting the operational characteristics of the 2015 calendar year ferry operations.

  6. 40 CFR 60.105a - Monitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking...

    Science.gov (United States)

    2010-07-01

    ..., Catalytic Reforming Units, and Sulfur Recovery Units. (iii) The owner or operator shall install, operate... for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). 60.105a Section 60.105a... and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). (a) FCCU and...

  7. Variation in the cost of 5 common operations in the United States.

    Science.gov (United States)

    Wakeam, Elliot; Molina, George; Shah, Neel; Lipsitz, Stuart R; Chang, David C; Gawande, Atul A; Haynes, Alex B

    2017-09-01

    Health care costs are an important policy focus in the United States. The magnitude and drivers of variation in the costs of common operative procedures are not well understood. We sought to characterize variation in costs across hospitals. We used data from the Nationwide Inpatient Sample from 2001-2011 for 5 elective operations: colectomy, coronary artery bypass graft, total knee arthroplasty, cesarean section, and lung resection. Hospitals were benchmarked for each using hierarchical risk- and reliability-adjustment methods to generate an observed-to-expected cost ratio, which was adjusted for patient demographics, comorbidity, wage index, and procedure complexity. Hospitals were divided into quintiles. Characteristics of high- and low-quintile hospitals and their adjusted outcomes were examined. Cost observed-to-expected ratios ranged widely for all 5 procedures: 14.9-fold for colectomy, 5.5-fold for coronary artery bypass graft, 12.5-fold for lung resection, 10.6-fold for total knee arthroplasty, and 28.0-fold for cesarean section. Comparing highest to lowest cost quintiles of hospitals, high-cost hospitals were more likely to serve minority and Medicaid patients. Mortality was elevated significantly in high-cost hospitals for colectomy, coronary artery bypass graft, and lung resection (adjusted odds ratio 1.99, 1.32, 2.57; respectively). Service lines were correlated at low-cost hospitals. There was a significant association between greater procedure volume and low-cost hospitals for colectomy, coronary artery bypass graft, and total knee arthroplasty. Despite robust adjustment, there is wide cost variation for common operative procedures in the United States. High-cost hospitals may need to focus on cost reduction at the hospital level to reduce cost across service lines. Benchmarking costs may identify significant opportunities to promote value, or the balance between cost and quality, in operative care in the United States. Copyright © 2017 Elsevier Inc

  8. Unit information system operational displays for VVER-1000 reactors

    International Nuclear Information System (INIS)

    Anikanov, S.S.; Carrera, J.P.; Gordon, P.

    1997-01-01

    The role of high level operational displays is explained as well as the principles of the design of such displays. The tasks of WWER operating personnel are described and the support provided by operational displays is highlighted. The architecture of the displays is also dealt with. (A.K.)

  9. Operative training in otolaryngology in the United Kingdom: a specialist registrar survey

    NARCIS (Netherlands)

    Georgalas, Christos; Hadjihannas, Edward; Ghufoor, Khalid; Pracy, Paul; Papesch, Michael

    2005-01-01

    OBJECTIVE: To assess the current status of operative training for otolaryngology specialist registrars in the United Kingdom. DESIGN: Web-based questionnaire survey. PARTICIPANTS: All otolaryngology specialist registrars in the United Kingdom. MAIN OUTCOME MEASURES: The overall satisfaction with

  10. 77 FR 62247 - Dynamic Positioning Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units...

    Science.gov (United States)

    2012-10-12

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard [Docket No. USCG-2011-1106] Dynamic Positioning... ``Mobile Offshore Drilling Unit Dynamic Positioning Guidance''. The notice recommended owners and operators of Mobile Offshore Drilling Units (MODUs) follow Marine Technology Society (MTS) Dynamic Positioning...

  11. USGS world petroleum assessment 2000; new estimates of undiscovered oil and natural gas, including reserve growth, outside the United States

    Science.gov (United States)

    ,

    2000-01-01

    Oil and natural gas account for approximately 63 percent of the world’s total energy consumption. The U.S. Geological Survey periodically estimates the amount of oil and gas remaining to be found in the world. Since 1981, each of the last four of these assessments has shown a slight increase in the combined volume of identified reserves and undiscovered resources. The latest assessment estimates the volume of technically recoverable conventional oil and gas that may be added to the world's reserves, exclusive of the United States, in the next 30 years. The USGS World Petroleum Assessment 2000 reports an increase in global petroleum resources, including a 20-percent increase in undiscovered oil and a 14-percent decrease in undiscovered natural gas compared to the previous assessment (table 1). These results have important implications for energy prices, policy, security, and the global resource balance.

  12. How Can the United States Army Improve Human Intelligence in Peace Operations?

    National Research Council Canada - National Science Library

    Wright, David

    2003-01-01

    .... These secondary collectors, such as the Military Police, Psychological Operations, Civil Affairs and Line Units conduct liaison with international and local police forces, host-government official...

  13. Operating Reserve Reductions from a Proposed Energy Imbalance Market with Wind and Solar Generation in the Western Interconnection

    Energy Technology Data Exchange (ETDEWEB)

    King, J.; Kirby, B.; Milligan, M.; Beuning, S.

    2012-05-01

    This paper considers several alternative forms of an energy imbalance market (EIM) proposed in the nonmarket areas of the Western Interconnection. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: balancing authority cooperation and sub-hourly dispatch. As the penetration of variable generation increases on the power system, additional interest in coordination would likely occur. Several alternative approaches could be used, but consideration of any form of coordinated unit commitment is beyond the scope of this analysis. This report examines the benefits of several possible EIM implementations--both separately and in concert.

  14. United Nations Peace Operations: The Applicable Norms and The Application of the Law of Armed Conflict

    National Research Council Canada - National Science Library

    Bialke, Joseph

    2000-01-01

    In this thesis, I first detail the history and applicable norms of United Nations peacekeeping operations, to include the use of force in self-defense as applicable to "classical" peacekeeping operations...

  15. Corrective economic dispatch and operational cycles for probabilistic unit commitment with demand response and high wind power

    International Nuclear Information System (INIS)

    Azizipanah-Abarghooee, Rasoul; Golestaneh, Faranak; Gooi, Hoay Beng; Lin, Jeremy; Bavafa, Farhad; Terzija, Vladimir

    2016-01-01

    Highlights: • Suggesting a new UC mixing a probabilistic security and incentive demand response. • Investigating the effects of uncertainty on UC using chance-constraint programming. • Proposing an efficient spinning reserve satisfaction based on a new ED correction. • Presenting a new operational cycles way to convert binary variable to discrete one. - Abstract: We propose a probabilistic unit commitment problem with incentive-based demand response and high level of wind power. Our novel formulation provides an optimal allocation of up/down spinning reserve. A more efficient unit commitment algorithm based on operational cycles is developed. A multi-period elastic residual demand economic model based on the self- and cross-price elasticities and customers’ benefit function is used. In the proposed scheme, the probability of residual demand falling within the up/down spinning reserve imposed by n − 1 security criterion is considered as a stochastic constraint. A chance-constrained method, with a new iterative economic dispatch correction, wind power curtailment, and commitment of cheaper units, is applied to guarantee that the probability of loss of load is lower than a pre-defined risk level. The developed architecture builds upon an improved Jaya algorithm to generate feasible, robust and optimal solutions corresponding to the operational cost. The proposed framework is applied to a small test system with 10 units and also to the IEEE 118-bus system to illustrate its advantages in efficient scheduling of generation in the power systems.

  16. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  17. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    International Nuclear Information System (INIS)

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement

  18. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  19. Phase I and II feasibility study report for the 300-FF-5 operable unit

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018

  20. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... a Combined License) of New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY... a COL intending to construct and operate new nuclear power plants (NPPs) on multi-unit sites to... Impacts of Construction (under a Combined License) of New Nuclear Power Plants on Operating Units at Multi...

  1. An Examination of the United States Air Service's Logistics Operations

    National Research Council Canada - National Science Library

    Hunt, Andrew

    1998-01-01

    This historical study details the U.S. Air Service's logistics operations at home and abroad in an attempt to determine the relationship between the process and more recently established logistic principles...

  2. Brunswick Steam Electric Plant, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 30,399 MWH with the generator on line 334.5 hrs. Unit 2 generated 2,481,014 MWH with the generator on line 4,915.53 hrs. Information is presented concerning operations, shutdowns and power reductions, maintenance, power generation, modifications, changes to operational procedures, radiation exposures, and leak rate testing

  3. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  4. System-Level Operational and Adequacy Impact Assessment of Photovoltaic and Distributed Energy Storage, with Consideration of Inertial Constraints, Dynamic Reserve and Interconnection Flexibility

    Directory of Open Access Journals (Sweden)

    Lingxi Zhang

    2017-07-01

    Full Text Available The growing penetration of solar photovoltaic (PV systems requires a fundamental understanding of its impact at a system-level. Furthermore, distributed energy storage (DES technologies, such as batteries, are attracting great interest owing to their ability to provide support to systems with large-scale renewable generation, such as PV. In this light, the system-level impacts of PV and DES are assessed from both operational and adequacy perspectives. Different control strategies for DES are proposed, namely: (1 centralised, to support system operation in the presence of increasing requirements on system ramping and frequency control; and (2 decentralised, to maximise the harnessing of solar energy from individual households while storing electricity generated by PV panels to provide system capacity on request. The operational impacts are assessed by deploying a multi-service unit commitment model with consideration of inertial constraints, dynamic reserve allocation, and interconnection flexibility, while the impacts on adequacy of supply are analysed by assessing the capacity credit of PV and DES through different metrics. The models developed are then applied to different future scenarios for the Great Britain power system, whereby an electricity demand increase due to electrification is also considered. The numerical results highlight the importance of interconnectors to provide flexibility. On the other hand, provision of reserves, as opposed to energy arbitrage, from DES that are integrated into system operation is seen as the most effective contribution to improve system performance, which in turn also decreases the role of interconnectors. DES can also contribute to providing system capacity, but to an extent that is limited by their individual and aggregated energy availability under different control strategies.

  5. An Appraisal Of The Operation And Management Of Unit Trust ...

    African Journals Online (AJOL)

    A lot of money is held by the public instead of being invested in shares or in money market instruments as a result of widespread financial illiteracy. Many people do not know that not only well-to-do people can invest in the shares of companies. This is because they are not aware of schemes like unit trust through which ...

  6. 7 CFR 631.22 - Access to operating unit.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Miscellaneous § 631.22... unit for the purpose of ascertaining the accuracy of any representations made in a contract or leading up to a contract, and as to the performance of the terms and conditions of the contract. Access shall...

  7. Compatibility of pressure sensitive adhesives with recycling unit operations

    Science.gov (United States)

    David. Bormett; Carl. Houtman; Said. Abubakr; Joseph. Peng

    1999-01-01

    Removal of pressure sensitive adhesives (PSAs) from recovered paper is a major problem facing the paper recycling industry. As a result of a United States Postal Service (USPS) initiative, which currently purchases about 12% of domestic PSA production, a team was formed consisting of representatives from the USPS, the Forest Products Laboratory, Springborn Testing and...

  8. Evolution of United States Army Deployment Operations: The Santiago Campaign

    Science.gov (United States)

    2015-09-03

    the leader of the campaign. Secretary of War Russell Alger; Adjutant General of the United States Army, Colonel Henry Corbin ; and Commanding...Military Studies Henry A. Arnold III, COL Accepted this 23rd day of May 2015 by: _________________________________________, Director...stores and one telegraph office. The main attraction was the Tampa Bay Hotel that rested on six acres with a silver dome covering a small casino. Henry B

  9. Optimizing Resources of United States Navy for Humanitarian Operations

    Science.gov (United States)

    2014-08-26

    teaching and developing master’s students and executives in the U.S. and Europe in principles of supply chain management and manufacturing operations. He...critical capabilities. Large number of deaths and injuries Population dispersion, homelessness , and large number of missing persons Increased

  10. 101st Sustainment Brigade Supports Operation United Assistance

    Science.gov (United States)

    2016-05-17

    Petty, and Maj. Benjamin Polanco Jr. Capt. Shawn Palmer, a biochemist with the 1st Area Medical Laboratory from Aberdeen Proving Ground, Maryland...I order- ing cycle that resulted in predictable, sustainable, and timely delivery of rations. Operational rations were also stored in a warehouse

  11. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electric power generated in 1975 was 1,074,401 MW(e) with the generator on line 4,680.7 hrs. Information is presented concerning operations, maintenance, radioactive effluents and waste shipments, health physics, shutdowns, and personnel exposures

  12. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 2,587,248 MWH(e) with the reactor on line 6,242.4 hr. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, and reportable occurrences

  13. A Study of a Hospital Operating Unit as a Foundation for Future Improvements

    OpenAIRE

    Rydenfält, Christofer

    2011-01-01

    The main objective of the research presented was to gain an understanding of how the dynamics between professionals, tools and objectives work in an operating unit in order to obtain knowledge useful when designing the operating unit of the future with emphasis on the work environment, effectiveness and patient safety. By investigating how different professions in the operating theatre view their work and its dynamics, as well as observing how the work is actually carried out, it is possible ...

  14. Cost and Operational Effectiveness Analysis of Aiternative Force Structures for Fulfillment of the United States Marine Corps Operational Support Airlift and Search and Rescue Missions

    National Research Council Canada - National Science Library

    Chase, Eric

    2000-01-01

    This thesis provides a preliminary cost and operational effectiveness analysis of alternative force structures for the United States Marine Corps operational support airlift and search and rescue missions...

  15. Economic Viability of Pumped-Storage Power Plants Equipped with Ternary Units and Considering Hydraulic Short-Circuit Operation

    Science.gov (United States)

    Chazarra, Manuel; Pérez-Díaz, Juan I.; García-González, Javier

    2017-04-01

    This paper analyses the economic viability of pumped-storage hydropower plants equipped with ternary units and considering hydraulic short-circuit operation. The analysed plant is assumed to participate in the day-ahead energy market and in the secondary regulation service of the Spanish power system. A deterministic day-ahead energy and reserve scheduling model is used to estimate the maximum theoretical income of the plant assuming perfect information of the next day prices and the residual demand curves of the secondary regulation reserve market. Results show that the pay-back periods with and without the hydraulic short-circuit operation are significantly lower than their expected lifetime and that the pay-back periods can be reduced with the inclusion of the hydraulic short-circuit operation.

  16. The United States Army Operating Concept, 2016-2028

    Science.gov (United States)

    2010-08-19

    Recommended Changes to Publications and Blank Forms) to Director, TRADOC ARCIC (ATFC-ED), 20 Whistler Lane, Fort Monroe, Virginia 23651-1046...Corps-Iraq, established a Counter IED Operations Intelligence Center (COIC), directed by Colonel James Hickey, to focus, integrate, and synchronize...71. 44 James A. Dewar, Carl H. Builder, William M. Hix, Morlie H. Levin, Assumption-based planning, RAND 1993. 45 Drilling for certainty http

  17. Cognitive model of the power unit operator activity

    International Nuclear Information System (INIS)

    Chachko, S.A.

    1992-01-01

    Basic notions making it possible to study and simulate the peculiarities of man-operator activity, in particular his way of thiking, are considered. Special attention is paid to cognitive models based on concept of decisive role of knowledge (its acquisition, storage and application) in the man mental processes and activity. The models are based on three basic notions, which are the professional world image, activity strategy and spontaneous decisions

  18. United Nations Operations: Who Should be in Charge?

    Science.gov (United States)

    1994-04-01

    Cold War; Panama, Iraq, and the New World Order, in RIGHT V. MIGHT, supra note 16, at 109, 128; and HANS KELSON, THE LAW OF THE UNITED NATIONS 928...interpretation would also appear to resolve Kelsen’s dilemma (see KELSEN , supra note 35, at 935) with respect to the Korean conflict. Kelsen argues the Security...and Scheffer, supra note 35, at 131. 45. See D. J. HARRIS, CASES AND MATERIAL ON INTERNATIONAL LAW 681 (4th ed. 1991); KELSEN , supra note 35, at 756

  19. Experimental determinations of the turbine condenser operation at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Romascu, Gabriel; Dragusin, Dumitru; Rogociu, Ioan; Macodean, Luminita; Marciulescu, George

    1999-01-01

    The condenser system represents one of the most important BOP (balance of plant) systems of the CANDU 700 MW Unit at Cernavoda NPP. The paper presents theoretical calculation elements, mathematical model for simulation of condenser operation and the results obtained by model implementation as compared to operation data. The model could be adapted to other turbine and operation regime types. (authors)

  20. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for such commercial air operations as crop dusting, pest control, pipeline patrol, mapping, surveying...

  1. Operation of the radioactive acid-digestion test unit (RADTU)

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1981-01-01

    At the Karlsruhe Nuclear Research Center, research and development work concerned with the acid digestion of combustible waste with high plutonium content is being carried out. The main objectives are the reduction of the waste volume, the recovery of the plutonium and the transformation of the process residues into a product suitable for final disposal. For this purpose an inactive demonstration plant with a throughput of 1.5 kg/h has been constructed. In the first version, the reactor of this plant was a tray reactor of the HEDL type. During test operations the sedimentation of a residue was observed on the tray. The density of this residue was higher than that of the residue suspended in the reaction acid. Experiments using tantalum oxide (D=8.4 g/cm 3 ) to simulate the plutonium oxide (D=11.5 g/cm 3 ) have verified this observation. This means that in active operation a sedimentation of plutonium oxide on the tray is to be expected. With respect to these results a new reactor was developed where the settling of the residue is avoided by appropriate design and high circulation velocity of the reaction acid. The reactor consists of a tube 50-80 mm in diameter, which is curved to form a closed loop with an arm length of about 1x1 m. Since October 1979 this ring reactor has been under inactive test operation. Its behaviour is very stable. The velocity of the reaction acid in the heater is 0.5-1 m/s. A settling of residues or tantalum oxide has not been observed. The throughput attained is comparable to that of the tray reactor but the space requirement is three times smaller, and the volume of the reaction acid four times smaller. (author)

  2. 47 CFR 90.421 - Operation of mobile station units not under the control of the licensee.

    Science.gov (United States)

    2010-10-01

    ....421 Operation of mobile station units not under the control of the licensee. Mobile stations, as... unauthorized operation of such units not under its control. (a) Public Safety Pool. (1) Mobile units licensed... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operation of mobile station units not under the...

  3. United Kingdom: Procurement Related Nuclear Experience (Operating Experience)

    International Nuclear Information System (INIS)

    2016-01-01

    Procurement of nuclear facilities in the United Kingdom is subject to nuclear site licence conditions issued by the Government through the Office for Nuclear Regulation (ONR). Each nuclear facility in the United Kingdom must have a nuclear site licence and must comply with the 36 general conditions that are set out in the Licence Condition Handbook (October 2014). In addition, the ONR has published a technical assessment guide for the procurement of nuclear safety related items or services; a guide on intelligent customers and a guide on records management also apply to the procurement phase, and ONR interventions look across all three of these documents. Procurement governance arrangements need to be developed (including a policy, manual, procedures and template documents) and approved within the utility company. The ONR monitors the arrangements via interventions and deems the arrangements to be ‘adequate’. Some procurement contracts become lifetime records for nuclear safety related systems and need to be retained while the plant is in place. A formal record retention schedule needs to be created and managed by the procurement organization. The utility company may elect to set hold points during the various procurement stages and, importantly, obtain approval for the contract and its content from all technical stakeholders (with particular emphasis on the engineering, project management and design authority quality functions before contract award). For contracts with high nuclear safety significance, the ONR may enforce additional hold points before and/or after contract award. There is a general requirement that the utility puts in place adequate arrangements to ensure that suitably qualified and experienced personnel are employed to implement adequate management arrangements and to act as an intelligent customer. This includes being able to demonstrate that any contractor or supplier is suitable, capable and experienced, and has the necessary processes and

  4. Analysis of low-temperature EAST system operation unit

    International Nuclear Information System (INIS)

    Zhuang Ming; Hu Liangbing; Feng Hansheng; Zhang Qiyong; Yuan Chunyan

    2010-01-01

    EAST (Experimental Advanced Superconductive Tokamak) is the first fully superconductive Tokamak fusion experimental devices in the world. The CIC (cable in conduit) type toroidal field (TF) and poloidal field (PF) coils are made of NbTi/Cu hybrid materials. The main EAST cryogenic users are TF and PF coils, their current leads, the superconducting (SC) buslines, the magnet support structures, and thermal shields. EAST cryogenic system is responsible for supplying supercritical helium and cold helium to cold components, the safe and steady operation of which is an essential condition for successful physics experiments. Since the first commissioning in February 2006, it was cooled down for five plasma physics experimental campaigns. In the fifth experiment, stable and repeatable 60 seconds plasma discharge were achieved with D-shape cross-section and double null divertor configuration under the condition that the temperature of central electrons is 15 million degrees celsius and elongation ratio is 1.9. This paper presents the operating behavior of the cryogenic system in the past 5 experiments. This analysis is helpful for increasing the stability of the cryogenic system, and also with further purpose to guarantee the success of the long plasma duration experiments in future. (authors)

  5. Standard formatted data units-control authority operations

    Science.gov (United States)

    1991-01-01

    The purpose of this document is to illustrate a Control Authority's (CA) possible operation. The document is an interpretation and expansion of the concept found in the CA Procedures Recommendation. The CA is described in terms of the functions it performs for the management and control of data descriptions (metadata). Functions pertaining to the organization of Member Agency Control Authority Offices (MACAOs) (e.g., creating and disbanding) are not discussed. The document also provides an illustrative operational view of a CA through scenarios describing interaction between those roles involved in collecting, controlling, and accessing registered metadata. The roles interacting with the CA are identified by their actions in requesting and responding to requests for metadata, and by the type of information exchanged. The scenarios and examples presented in this document are illustrative only. They represent possible interactions supported by either a manual or automated system. These scenarios identify requirements for an automated system. These requirements are expressed by identifying the information to be exchanged and the services that may be provided by a CA for that exchange.

  6. Ground Operations Demonstration Unit for Liquid Hydrogen Initial Test Results

    Science.gov (United States)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-01-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  7. Preparation status for continuous operation of Kori unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Choi, C.H. . E-mail : chechee@khnp.co.kr

    2005-01-01

    Kori unit 1 Nuclear Power Plant is the first commercial operation plant in Korea. In Korea, the life extension of NPP beyond design lifetime reached practically application stage. Preparations status for continuous operation of Kori unit 1, Many researches have demonstrated that life extension beyond design lifetime is possible in terms of technology. This paper is to introduce and to share the continuous operation preparations status and schedule for Kori unit 1 License Renewal Process an additional every 10 years beyond the design life 30 years term. (author)

  8. Operational Optimization of Large-Scale Parallel-Unit SWRO Desalination Plant Using Differential Evolution Algorithm

    Science.gov (United States)

    Wang, Xiaolong; Jiang, Aipeng; Jiangzhou, Shu; Li, Ping

    2014-01-01

    A large-scale parallel-unit seawater reverse osmosis desalination plant contains many reverse osmosis (RO) units. If the operating conditions change, these RO units will not work at the optimal design points which are computed before the plant is built. The operational optimization problem (OOP) of the plant is to find out a scheduling of operation to minimize the total running cost when the change happens. In this paper, the OOP is modelled as a mixed-integer nonlinear programming problem. A two-stage differential evolution algorithm is proposed to solve this OOP. Experimental results show that the proposed method is satisfactory in solution quality. PMID:24701180

  9. History and evaluation of the operation of Jaslovske Bohunice V-1 NPP Unit 1

    International Nuclear Information System (INIS)

    Obert, M.; Kovac, V.

    2007-01-01

    The following information is provided: Deadline and reasons for discontinuation of operation of V-1 reactor unit 1; improvements of V-1 reactor units in early 1990s ('Minor Reconstruction'); 'Gradual Reconstruction': underlying requirements, systems concerned, implementation process and results; technical and economic indicators of operation of V-1 unit 1; reasons for and way of transfer of the V-1 NPP to a new company within the process of privatization of the Slovenske elektrarne Inc. utility; and, in conclusion, assessment of the operation and outline of planned activities within the decommissioning process. (orig.)

  10. The chemical energy unit partial oxidation reactor operation simulation modeling

    Science.gov (United States)

    Mrakin, A. N.; Selivanov, A. A.; Batrakov, P. A.; Sotnikov, D. G.

    2018-01-01

    The chemical energy unit scheme for synthesis gas, electric and heat energy production which is possible to be used both for the chemical industry on-site facilities and under field conditions is represented in the paper. The partial oxidation reactor gasification process mathematical model is described and reaction products composition and temperature determining algorithm flow diagram is shown. The developed software product verification showed good convergence of the experimental values and calculations according to the other programmes: the temperature determining relative discrepancy amounted from 4 to 5 %, while the absolute composition discrepancy ranged from 1 to 3%. The synthesis gas composition was found out practically not to depend on the supplied into the partial oxidation reactor (POR) water vapour enthalpy and compressor air pressure increase ratio. Moreover, air consumption coefficient α increase from 0.7 to 0.9 was found out to decrease synthesis gas target components (carbon and hydrogen oxides) specific yield by nearly 2 times and synthesis gas target components required ratio was revealed to be seen in the water vapour specific consumption area (from 5 to 6 kg/kg of fuel).

  11. Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR.

  12. Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-10-01

    The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

  13. Example of cost calculations for an operating room and a post-anaesthesia care unit.

    Science.gov (United States)

    Raft, J; Millet, F; Meistelman, C

    2015-08-01

    The aim of this study was to evaluate the cost of an operating room using data from our hospital. Using an accounting-based method helped us. Over the year 2012, the sum of direct and indirect expenses with cost sharing expenses allowed us to calculate the cost of the operating room (OR) and of the post-anaesthesia care unit (PACU). The cost of the OR and PACU was €10.8 per minute of time offered. Two thirds of the direct expenses were allocated to surgery and one third to anaesthesia. Indirect expenses were 25% of the direct expenses. The cost of medications and single use medical devises was €111.45 per anaesthesia. The total cost of anaesthesia (taking into account wages and indirect expenses) was €753.14 per anaesthesia as compared to the total cost of the anaesthesia. The part of medications and single use devices for anaesthesia was 14.8% of the total cost. Despite the difficulties facing cost evaluation, this model of calculation, assisted by the cost accounting controller, helped us to have a concrete financial vision. It also shows that a global reflexion is necessary during financial decision-making. Copyright © 2015 Société française d’anesthésie et de réanimation (Sfar). Published by Elsevier Masson SAS. All rights reserved.

  14. Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit

    International Nuclear Information System (INIS)

    1995-03-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR

  15. Analysis of Fukushima unit 2 accident considering the operating conditions of RCIC system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Il, E-mail: sikim@kaeri.re.kr; Park, Jong Hwa; Ha, Kwang Soon; Cho, Song-Won; Song, JinHo

    2016-03-15

    Highlights: • Fukushima unit 2 accident was analyzed using MELCOR 1.8.6. • RCIC operating conditions were assumed and best case was selected. • Effect of RCIC operating condition on accident scenario was found. - Abstract: A severe accident in Fukushima occurred on March 11, 2011 and units 1, 2 and 3 were damaged severely. A tsunami following an earthquake made the supply of electricity power stop, and the safety systems, which use AC or DC power in plants could not operate properly. It is supposed that the degree of core degradation of unit 2 is less serious than in the other plants, and it was estimated that the operation of reactor core isolation cooling (RCIC) system at the initial stage of the accident minimized the core damage through decay heat removal. Although the operating conditions of the RCIC system are not known clearly, it can be important to analyze the accident scenario of unit 2. In this study, best case of the Fukushima unit 2 accident was presented considering the operating conditions of the RCIC system. The effects of operating condition on core degradation and fission product release rate to environment were also examined. In addition, importance of torus room flooding level in the accident analysis was discussed. MELCOR 1.8.6 was used in this research, and the geometries of plant and operating conditions of safety system were obtained from TEPCO through OECD/NEA BSAF Project.

  16. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  17. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  18. Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits

    Energy Technology Data Exchange (ETDEWEB)

    Naiknimbalkar, N.

    1993-08-01

    This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging.

  19. 78 FR 39018 - Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 2 and 3

    Science.gov (United States)

    2013-06-28

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 2 and 3 AGENCY: Nuclear Regulatory Commission. ACTION: Supplement to Final Supplement 38 to the Generic Environmental...

  20. Start-up and commercial operation of the Laguna Verde power plants, unit 1

    International Nuclear Information System (INIS)

    Torres R, J.F.

    1991-01-01

    The main features of the unit 1 of the Laguna Verde Power Plant is presented as well as the phases of the start-up process. The process includes various steps and tests up to start the commercial operation. (author)

  1. Explicit isospectral flows for the AKNS operator on the unit interval

    International Nuclear Information System (INIS)

    Amour, L

    2009-01-01

    We consider the AKNS operator on the unit interval. The boundary conditions are self-adjoint separated boundary conditions. For fixed boundary conditions, we make the formulae for flows induced by general tangent vector fields on isospectral sets explicit

  2. Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits

    International Nuclear Information System (INIS)

    Naiknimbalkar, N.

    1993-01-01

    This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging

  3. Analysis of the Vertical Takeoff and Landing Unmanned Aerial Vehicle (VTUAV) in Small Unit Urban Operations

    National Research Council Canada - National Science Library

    Cason, Roman

    2004-01-01

    ...) to replace the aging Pioneer Unmanned Aerial Vehicle (UAV) system. This thesis examines the critical elements this platform must possess to effectively support small units operating in urban environments...

  4. Revised Final Remedial Investigation. Addendum Report for Operable Units 4, 8, and 9. Volume I

    National Research Council Canada - National Science Library

    Davis, Karl Clune

    1997-01-01

    This revised final report presents the results of previous investigations as well as the results of the Phase I and Phase II RI sampling and analysis for 11 SWMUs within three operable units at Tooele Army Depot (TEAD...

  5. Military Operations Against Terrorist Groups Abroad: Implications for the United States Air Force

    National Research Council Canada - National Science Library

    Ochmanek, David

    2003-01-01

    .... The purpose of this study is to help defense planners anticipate the types of demands that future operations against terrorists will place on the armed forces of the United States, particularly...

  6. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  7. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. Shanklin

    2006-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

  8. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  9. H. B. Robinson Plant, Unit 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit achieved a good performance record through the year, experiencing only short duration shutdowns or power reductions. Information is presented concerning operations, maintenance, shutdowns, and occupational radiation exposures. In November there was a scheduled refueling lasting 40 days. After a start-up physics test program, the unit achieved 100 percent power on December 22, 1976

  10. Quad-Cities Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 2,024,125 net electrical MWH and the generator was on line 3162.6 hours. Unit 2 generated 746,184 net electrical MWH and was on line 1475.3 hrs. Data is included concerning operations, power generation, shutdowns, maintenance, changes, and tests. (FS)

  11. Does the United States’ Strategic Mobility Program Support the Needs of Operational Commanders

    Science.gov (United States)

    2010-10-01

    engineering and humanitarian relief missions conducted by USSOUTHCOM in Cnetral American and the Carribean . 70 Ibid. 25 vessels with two berths of...Does the United States’ Strategic Mobility Program Support the Needs of Operational Commanders? A Monograph by MAJ Erik E. Hilberg United...per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and

  12. Operation Bali assist--the Royal Darwin Hospital Intensive Care Unit.

    Science.gov (United States)

    Stephens, D P; De Keulenaer, B L; Collins, S; Harbison, P W; Weidmann, G; Potter, A W

    2003-06-01

    On October 12, 2002 the Bali bombing resulted in 62 severely injured patients being evacuated to Royal Darwin Hospital. This paper describes the planning and execution of the Intensive Care Unit disaster plan in the wake of the Bali bombing. There were a total of 20 patients from the Bali blast admitted to the Intensive Care Unit. The disaster operation was successful with all patients admitted, resuscitated, emergency treatment performed and then evacuated to interstate burns units in a timely and efficient manner.

  13. Point Beach Nuclear Plant, Units 1 and 2. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    Unit 1 generated 227,877 MWH with the generator on-line 540 hrs and Unit 2 generated 324,954 MWH with the generator on-line 696 hrs. Information is presented concerning operating experience; procedure changes, tests, and experiments; maintenance, licensee event reports and other events of interest; data tabulations of electric power generation, unit shutdowns, forced power reductions, and number of personnel and Man/Rem exposure; eddy current testing of steam generator tubes; and fuel history

  14. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January thru December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 953,015.5 MWH with the generator on line 7,399.37 hrs. Unit 2 generated 4,371,553.689 MWH with the generator on line 6,664.58 hrs while Unit 3 generated 4,034,251 MWH with the generator on line 7,234.86 hrs. Information is presented concerning operations, maintenance, and shutdowns

  15. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  16. Effect of RCIC Operating Conditions on the Accident Scenario in Fukushima Unit 2

    International Nuclear Information System (INIS)

    Kim, Sung Il; Park, Jong Hwa; Ha, Kwang Soon

    2015-01-01

    This study was conducted by using MELCOR 1.8.6. Fukushima unit 2 accident was analyzed using MELCOR in this study, and best estimate scenario with considering RCIC operating conditions was presented. Researches on the boiling water reactor (BWR) plant with reactor core isolation cooling (RCIC) system have been conducted. Research on the RCIC operation in Fukushima unit 2 was also conducted by Sandia National Laboratory. MELCOR analysis of the Fukushima unit 2 accident was conducted in the report and energy balance in wetwell was described by considering RCIC operation. However, the effect of RCIC operation condition on the accident scenario has not been studied. The operating conditions of RCIC system affect the pressures in wetwell and drywell, and the high pressure can make leakage path of fission product from PCV to reactor building. Thus it can be directly related with the amount of fission product which released to environment. In this study, severe accident on Fukushima unit 2 was analyzed considering the operating condition of RCIC system, and best estimated scenario was presented. In addition, the effect of RCIC turbine efficiency on the accident progression was examined. Energy balance in suppression chamber was also considered with discussion on the effect of torus room flooding level. It was found that the operating condition of RCIC turbine not only affects the variation of drywell pressure but also the amount of released fission products to environment. It was also confirmed that the RCIC turbine efficiency in the accident would be less than normal operating condition

  17. Short-Term and Long-Term Effects of United Nations Peace Operations

    OpenAIRE

    Sambanis, Nicholas

    2007-01-01

    Earlier studies have shown that United Nations peace operations make a positive contribution to peacebuilding efforts after civil wars. But do these effects carry over to the period after the peacekeepers leave? And how do the effects of UN peace operations interact with other determinants of peacebuilding in the long run? The author addresses these questions using a revised version of the...

  18. Decommissioning strategy of the operating WWER type units in the Ukraine

    International Nuclear Information System (INIS)

    Litvinsky, L.L.; Lobach, Yu.N.; Skripov, A.E.

    2002-01-01

    At present in Ukraine, 13 WWER type units are in operation and two other ones are in the final stage of construction. Decommissioning of these units is expected after the year 2010. General planning of their decommissioning is developed in the framework of the decommissioning strategy of operating WWER type units. The strategy contains the objectives, principles and main tasks of the decommissioning as well as the activities at each phase of decommissioning. It is considered a broad range of factors important for the planning and implementation of decommissioning. (author)

  19. Operating experience with unit for sulfuric acid alkylation of isobutane by butylenes

    Energy Technology Data Exchange (ETDEWEB)

    Tagavov, I.T.; Sumanov, V.T.; Khadzhiev, S.N.

    1988-09-01

    The operation of units for the sulfuric acid alkylation of isobutanes by butylenes have been performed. The reaction was carried out in a KSG-3 horizontal sulfuric acid contractor. A butane-butylene fraction from catalytic cracking and an isobutane fraction from the central gas fractionating unit were used as a feedstock. The studies have shown that the unit will give a high-quality product under various conditions of operation. The specific consumption of sulfuric acid in processing different types of feed remains within acceptable limits.

  20. Feasibility study report for the 200-BP-1 operable unit. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 {times} 10{sup 5}.

  1. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992

  2. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  3. Kozloduy NPP units 5 and 6 modernization program. Requirements for operational initiating events

    International Nuclear Information System (INIS)

    Hristova, R.; Kalchev, B.; Moncheva, I.

    2006-01-01

    This paper deals with an investigation whose object was to review the correspondence of the performed modernization measures on units 5 and 6 in NPP Kozloduy with the demands of the operational practices, including recovering of causes for repeating and dependent initiating events. In the investigation measures, related to operational events modernisation, were identified and it was substantiated that the modernisation program is closely related to the operational demands

  4. Results of toxicity tests and chemical analyses conducted on sediments collected from the TNX Outfall Delta Operable Unit, July 1999

    International Nuclear Information System (INIS)

    Specht, W.L.

    2000-01-01

    In order to provide unit specific toxicity data that will be used to address critical uncertainty in the ecological risk assessment (ERA) for the TNX Outfall Delta Operable Unit (TNXOD OU), sediments were collected from eight locations in the Inner Swamp portion of the operable unit and two unit specific background locations. These samples were analyzed for total mercury, total uranium, and sediment toxicity

  5. Eliminate the Army and Air Force Reserves: Building a Robust National Guard to Meet 21st Century Operational Challenges

    Science.gov (United States)

    2016-04-04

    CENTURY REFORM Militia Reform and the Creation of the Army Reserve The Spanish -American War of 1898 is often cited as providing the impetus for...substantial gain in 1908 when Congress established a Medical Reserve Corps to address medical inadequacies identified during Spanish -American War.6...study the matter.26 Lack of transparency in the reserve components bureaucracies prevented the GAO from providing members of Congress a definitive

  6. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research Into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H., III; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2011-01-01

    The Applied Meteorology Unit (AMU) provides technology development and transition services to improve operational weather support to America's space program . The AMU was founded in 1991 and operates under a triagency Memorandum of Understanding (MOU) between the National Aeronautics and Space Administration (NASA), the United States Air Force (USAF) and the National Weather Service (NWS) (Ernst and Merceret, 1995). It is colocated with the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS) and funded by the Space Shuttle Program . Its primary customers are the 45WS, the Spaceflight Meteorology Group (SMG) operated for NASA by the NWS at the Johnson Space Center (JSC) in Houston, TX, and the NWS forecast office in Melbourne, FL (MLB). The gap between research and operations is well known. All too frequently, the process of transitioning research to operations fails for various reasons. The mission of the AMU is in essence to bridge this gap for America's space program.

  7. Remedial investigation/feasibility study report for lower Watts Bar Reservoir Operable Unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the Lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch River. This area has received hazardous substances released over a period of 50 years from the U.S. Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received containments, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. Water-soluble contaminants released to ORR surface waters are rapidly diluted upon entering the Clinch River and then quickly transported downstream to the Tennessee River where further dilution occurs. Almost the entire quantity of these diluted contaminants rapidly flows through LWBR. In contrast, particle-associated contaminants tend to accumulate in the lower Clinch River and in LWBR in areas of sediment deposition. Those particle-associated contaminants that were released in peak quantities during the early years of ORR operations (e.g., mercury and 137 Cs) are buried under as much as 80 cm of cleaner sediment in LWBR. Certain contaminants, most notably polychlorinated biphenyls (PCBs), have accumulated in LWBR biota. The contamination of aquatic biota with PCBs is best documented for certain fish species and extends to reservoirs upstream of the ORR, indicating a contamination problem that is regional in scope and not specific to the ORR

  8. Influence of unit operations on the levels of polyacetylenes in minimally processed carrots and parsnips: An industrial trial.

    Science.gov (United States)

    Koidis, Anastasios; Rawson, Ashish; Tuohy, Maria; Brunton, Nigel

    2012-06-01

    Carrots and parsnips are often consumed as minimally processed ready-to-eat convenient foods and contain in minor quantities, bioactive aliphatic C17-polyacetylenes (falcarinol, falcarindiol, falcarindiol-3-acetate). Their retention during minimal processing in an industrial trial was evaluated. Carrot and parsnips were prepared in four different forms (disc cutting, baton cutting, cubing and shredding) and samples were taken in every point of their processing line. The unit operations were: peeling, cutting and washing with chlorinated water and also retention during 7days storage was evaluated. The results showed that the initial unit operations (mainly peeling) influence the polyacetylene retention. This was attributed to the high polyacetylene content of their peels. In most cases, when washing was performed after cutting, less retention was observed possibly due to leakage during tissue damage occurred in the cutting step. The relatively high retention during storage indicates high plant matrix stability. Comparing the behaviour of polyacetylenes in the two vegetables during storage, the results showed that they were slightly more retained in parsnips than in carrots. Unit operations and especially abrasive peeling might need further optimisation to make them gentler and minimise bioactive losses. Copyright © 2011 Elsevier Ltd. All rights reserved.

  9. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  10. 40 CFR Table 16 to Subpart Uuu of... - Operating Limits for Organic HAP Emissions From Catalytic Reforming Units

    Science.gov (United States)

    2010-07-01

    ... Emissions From Catalytic Reforming Units 16 Table 16 to Subpart UUU of Part 63 Protection of Environment... Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63... Catalytic Reforming Units As stated in § 63.1566(a)(2), you shall meet each operating limit in the following...

  11. 40 CFR Table 2 to Subpart Uuu of... - Operating Limits for Metal HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63... Emissions From Catalytic Cracking Units 2 Table 2 to Subpart UUU of Part 63 Protection of Environment... Catalytic Cracking Units As stated in § 63.1564(a)(2), you shall meet each operating limit in the following...

  12. 40 CFR Table 9 to Subpart Uuu of... - Operating Limits for Organic HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63... Emissions From Catalytic Cracking Units 9 Table 9 to Subpart UUU of Part 63 Protection of Environment... Catalytic Cracking Units As stated in § 63.1565(a)(2), you shall meet each operating limit in the following...

  13. Control technique for enhancing the stable operation of distributed generation units within a microgrid

    International Nuclear Information System (INIS)

    Mehrasa, Majid; Pouresmaeil, Edris; Mehrjerdi, Hasan; Jørgensen, Bo Nørregaard; Catalão, João P.S.

    2015-01-01

    Highlights: • A control technique for enhancing the stable operation of distributed generation units is proposed. • Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors. • The compensation of instantaneous variations in the reference current components is considered. • Simulation results confirm the performance of the control scheme within the microgrid. - Abstract: This paper describes a control technique for enhancing the stable operation of distributed generation (DG) units based on renewable energy sources, during islanding and grid-connected modes. The Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors of DG units during integration and power sharing with loads and/or power grid, which is an appropriate tool to analyze and define a stable operating condition for DG units in microgrid technology. The compensation of instantaneous variations in the reference current components of DG units in ac-side, and dc-link voltage variations in dc-side of interfaced converters, are considered properly in the control loop of DG units, which is the main contribution and novelty of this control technique over other control strategies. By using the proposed control technique, DG units can provide the continuous injection of active power from DG sources to the local loads and/or utility grid. Moreover, by setting appropriate reference current components in the control loop of DG units, reactive power and harmonic current components of loads can be supplied during the islanding and grid-connected modes with a fast dynamic response. Simulation results confirm the performance of the control scheme within the microgrid during dynamic and steady-state operating conditions

  14. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  15. Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

  16. Phase 1 remedial investigation report for 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit

  17. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  18. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Request

    Energy Technology Data Exchange (ETDEWEB)

    L. Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  19. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Report

    Energy Technology Data Exchange (ETDEWEB)

    Lee Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  20. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    International Nuclear Information System (INIS)

    1997-05-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  1. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Biggerstaff, R.L.

    1994-06-30

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy`s (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment.

  2. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    International Nuclear Information System (INIS)

    Biggerstaff, R.L.

    1994-01-01

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy's (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment

  3. Assessment of DoD-Provided Healthcare for Members of the United States Armed Forces Reserve Components

    Science.gov (United States)

    2014-10-08

    The TRICARE Dental Program covers the following services: • exams, cleanings, fluorides, sealants , and x-rays, • fillings, including white fillings...establish that programs will be in place to support the medical and dental readiness of Reserve Component (RC) service members so they comply with... dental care to RC service members for all wounds, illnesses, and injuries incurred or aggravated in the line of duty until they have recovered. Reserve

  4. Mortality on grower/finisher-only swine operations in the United States

    Directory of Open Access Journals (Sweden)

    Losinger W.C.

    1999-01-01

    Full Text Available For 53 grower/finisher-only swine operations that participated in the United States National Animal Health Monitoring System 1995 National Swine Study, mortality among finisher pigs ranged from 0 to 12.0% over a 6-month period. Twenty-six (49.1% had 2% mortality. Nine (17.0% operations experienced >4% mortality. Fisher's exact test revealed that operations with all-in all-out management were significantly more likely to have 1 grower/finisher pig came from another source. Larger operations (where >900 pigs entered the grower/finisher phase practiced all-in, all-out management more frequently than smaller operations, and had a lower mean percent mortality than smaller operations. Diagnosis of Salmonella in finisher pigs performed at a laboratory or by a veterinarian in the 12 months prior to interview was associated with both increased percent mortality and increased percent mortality per day.

  5. 31 CFR 357.13 - Obligations of the United States and the Federal Reserve Banks with respect to Book-entry...

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Obligations of the United States and... 357.13 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL... BONDS, NOTES AND BILLS HELD IN LEGACY TREASURY DIRECT Treasury/Reserve Automated Debt Entry System...

  6. 40 CFR 62.15145 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...

  7. NSSS design and cycle 1 operating history data for Arkansas Nuclear One, Unit-2. Final report

    International Nuclear Information System (INIS)

    Gagne, P.A.

    1981-03-01

    This report contains design and cycle 1 operating data for the Arkansas Nuclear One, Unit-2 nuclear steam supply system. The design data include descriptions of the reactor core, reactor coolant system, and control systems which are a part of the nuclear steam supply system. Operating history data are provided for the period of December 1978 through January 1980. The most important operating history data provided include reactor power, cumulative fuel burnup, control rod position, primary coolant temperature, and a series of power distribution state points

  8. Limited field investigation report for the 100-KR-4 Operable Unit

    International Nuclear Information System (INIS)

    1994-07-01

    This limited field investigation (LFI) was conducted to optimize the use of interim remedial measures (IRM) for expediting clean up while maintaining a technically sound and cost-effective program. The 100-KR-4 Operable Unit is one of four operable units associated with the 100 K Area. Operable units KR-1, KR-2 and KR-3 address contaminant sources while 100-KR-4 addresses contamination present in the underlying groundwater. The IRM decision process for groundwater operable units is based on three aspects: (1) Is the concentration greater than Hanford background? (2) Does the concentration present a medium or high human-health risk? (3) Does the concentration exceed an ecologically based applicable, relevant and appropriate requirements (ARAR) or present an environmental hazard quotient > I? The primary methods of investigation used during this LFI were the installation of monitoring wells and sampling of groundwater. The samples collected from the groundwater and soils were submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the location and degree of contamination. All soil samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all first round and a minimum of 10% of subsequent round data were validated

  9. Limited field investigation report for the 100-DR-1 Operable Unit

    International Nuclear Information System (INIS)

    1994-06-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km 2 (0.59 mi 2 ) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation

  10. Donald C. Cook Nuclear Power Plant, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit was paralleled to the grid 83.1 percent of the time and 7,073,200 MWH gross was generated. There were six scheduled outages and 14 forced outages/load reductions. Information is presented concerning operations, shutdowns, power reductions, inservice maintenance, personnel radiation exposures, fuel history, and facility changes

  11. Interprofessional Rhetoric and Operational Realities: An Ethnographic Study of Rounds in Four Intensive Care Units

    Science.gov (United States)

    Paradis, Elise; Leslie, Myles; Gropper, Michael A.

    2016-01-01

    Morning interprofessional rounds (MIRs) are used in critical care medicine to improve team-based care and patient outcomes. Given existing evidence of conflict between and dissatisfaction among rounds participants, this study sought to better understand how the operational realities of care delivery in the intensive care unit (ICU) impact the…

  12. Liquid phase methanol LaPorte process development unit: Modification, operation, and support studies

    Energy Technology Data Exchange (ETDEWEB)

    1991-02-02

    This report consists of Detailed Data Acquisition Sheets for Runs E-6 and E-7 for Task 2.2 of the Modification, Operation, and Support Studies of the Liquid Phase Methanol Laporte Process Development Unit. (Task 2.2: Alternate Catalyst Run E-6 and Catalyst Activity Maintenance Run E-7).

  13. Limited field investigation report for the 100-DR-1 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km{sup 2} (0.59 mi{sup 2}) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation.

  14. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit

  15. Development of in-situ product removal strategies in biocatalysis applying scaled-down unit operations

    DEFF Research Database (Denmark)

    Heintz, Søren; Börner, Tim; Ringborg, Rolf Hoffmeyer

    2017-01-01

    -automatically characterize ω-transaminases in a scaled-down packed-bed reactor (PBR) module, showing MPPA as a strong inhibitor. To overcome the inhibition, a two-step liquid-liquid extraction (LLE) ISPR concept was tested using scaled-down unit operations combined in a plug-and-play manner. Through the tested ISPR concept...

  16. ABOUT NOTION OF MEASUREMENT RELIABILITY WHEN MONITORING OPERATION MODES OF POWER UNITS

    Directory of Open Access Journals (Sweden)

    V. A. Anishchenko

    2005-01-01

    Full Text Available Monitoring process of measurement reliability in respect of variables that characterize operation modes of power units is investigated in the paper. Control algorithms based on the minimax criterion have been developed. These algorithms take into account the uncertainty in the notion of measurement reliability, the probability distribution laws for the variables under control, and the values of monitoring errors.

  17. 77 FR 40091 - Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating, Units 2 and 3

    Science.gov (United States)

    2012-07-06

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating, Units 2 and 3 AGENCY: Nuclear... statement for license renewal of nuclear plants; availability. SUMMARY: The U.S. Nuclear Regulatory...

  18. Limited field investigation report for the 100-BC-5 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This limited field investigation (LFI) was conducted to assess the applicability of interim remedial measures (IRM) for reducing human health and environmental risks within the 100-BC-5 Groundwater Operable Unit. The 100-BC-5 Operable Unit is one of three operable units associated with the 100 B/C Area. Operable units 1 and 2 address contaminant sources while 100-BC-5 addresses contamination present in the underlying groundwater. The primary method of investigation used during this LFI was the installation of monitoring wells. Samples were collected from the groundwater and soils and submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the locations and levels of contaminants. All samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all first round and 10% of the subsequent rounds of data associated with the LFI were validated. The screening method was used to identify contaminants of potential concern (COPC). This screening method eliminated from further consideration constituents that were below background. Constituents considered nontoxic to humans were eliminated from the human health evaluation. Inconsistency and blank contamination were also evaluated in the screening process. These COPC were evaluated further in the qualitative risk assessment (QRA). Tritium and strontium-90 were identified as contaminants of concern at 100-BC-5 because the concentrations exceeded potential applicable or relevant and appropriate requirements. The QRA determined that the risk is low for all of the site contaminants.

  19. 76 FR 5408 - Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3, Environmental Assessment and...

    Science.gov (United States)

    2011-01-31

    ... concluded that the proposed actions will have no significant impact. Environmental Assessment Identification... impacts associated with the proposed exemption. The details of the staff's safety evaluation will be... COMMISSION Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3, Environmental Assessment and...

  20. Hydrologic resources management program and underground test area operable unit fy 1997

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D. F., LLNL

    1998-05-01

    This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

  1. A Moveable Feast--A Progressive Approach to the Unit Operations Laboratory

    Science.gov (United States)

    Conner, Wm. Curtis, Jr.; Hammond, Karl D.; Laurence, Robert L.

    2011-01-01

    The authors describe an alternative format for the senior laboratory in which students are allowed--indeed, expected--to communicate with previous groups and build on their results. The effect is a unit operations laboratory in which students are empowered to propose the experiments they wish to do and in which the cumulative experience of the…

  2. Use of the LITEE Lorn Manufacturing Case Study in a Senior Chemical Engineering Unit Operations Laboratory

    Science.gov (United States)

    Abraham, Nithin Susan; Abulencia, James Patrick

    2011-01-01

    This study focuses on the effectiveness of incorporating the Laboratory for Innovative Technology and Engineering Education (LITEE) Lorn Manufacturing case into a senior level chemical engineering unit operations course at Manhattan College. The purpose of using the case study is to demonstrate the relevance of ethics to chemical engineering…

  3. 77 FR 31402 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2...

    Science.gov (United States)

    2012-05-25

    ... Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Application and Amendments to....regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment.... Your request should state that the NRC does not routinely edit comment submissions to remove such...

  4. Improving the Reliability of Technological Subsystems Equipment for Steam Turbine Unit in Operation

    Science.gov (United States)

    Brodov, Yu. M.; Murmansky, B. E.; Aronson, R. T.

    2017-11-01

    The authors’ conception is presented of an integrated approach to reliability improving of the steam turbine unit (STU) state along with its implementation examples for the various STU technological subsystems. Basing on the statistical analysis of damage to turbine individual parts and components, on the development and application of modern methods and technologies of repair and on operational monitoring techniques, the critical components and elements of equipment are identified and priorities are proposed for improving the reliability of STU equipment in operation. The research results are presented of the analysis of malfunctions for various STU technological subsystems equipment operating as part of power units and at cross-linked thermal power plants and resulting in turbine unit shutdown (failure). Proposals are formulated and justified for adjustment of maintenance and repair for turbine components and parts, for condenser unit equipment, for regeneration subsystem and oil supply system that permit to increase the operational reliability, to reduce the cost of STU maintenance and repair and to optimize the timing and amount of repairs.

  5. Audio Cues to Assist Visual Search in Robotic System Operator Control Unit Displays

    Science.gov (United States)

    2005-12-01

    Christopher C. Stachowiak , and Michael A. Lattin ARL-TR-3632 December 2005 Approved for...Assist Visual Search in Robotic System Operator Control Unit Displays Ellen C. Haas, Ramakrishna S. Pillalamarri, Christopher C. Stachowiak , and...5e. TASK NUMBER 6. AUTHOR(S) Ellen C. Haas, Ramakrishna S. Pillalamarri, Christopher C. Stachowiak , and Michael A. Lattin (all of ARL

  6. Indian Point Station, Units 1 and 2. Annual operations report No. 25, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Indian Point-1 Reactor remained in the shutdown condition in compliance with NRC's IAC for ECCS. Unit 2 generated 4,889,038 MWH(e) and was on line 8,323.1 hrs. Information is presented concerning operation, maintenance, occupational personnel radiation protection, primary coolant chemistry, abnormal occurrences, changes, tests, and experiments

  7. 36 CFR 251.18 - Rights-of-way reserved by the grantor on lands conveyed to the United States.

    Science.gov (United States)

    2010-07-01

    ... reservation shall be paid for at rates to be prescribed by the Forest Officer in charge, which rates shall be the usual stumpage prices charged in the locality in sales of national forest timber of the same kind or species; for injury to timber, second growth, and reproduction, the amount of actual damage shall...

  8. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    International Nuclear Information System (INIS)

    Mellor, S.P.; Matthee, F.W.

    2002-01-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  9. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    Energy Technology Data Exchange (ETDEWEB)

    Mellor, S.P.; Matthee, F.W. [ESKOM, Koeberg Nuclear Power Station (South Africa)

    2002-07-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  10. A bioethanol process development unit: initial operating experiences and results with a corn fiber feedstock.

    Science.gov (United States)

    Schell, Daniel J; Riley, Cynthia J; Dowe, Nancy; Farmer, Jody; Ibsen, Kelly N; Ruth, Mark F; Toon, Susan T; Lumpkin, Robert E

    2004-01-01

    Interest in bioethanol production from lignocellulosic feedstocks for use as an alternative fuel is increasing, but near-term commercialization will require a low cost feedstock. One such feedstock, corn fiber, was tested in the US Department of Energy (DOE)/National Renewable Energy Laboratory (NREL) bioethanol pilot plant for the purpose of testing integrated equipment operation and generating performance data. During initial runs in 1995, the plant was operated for two runs lasting 10 and 15 days each and utilized unit operations for feedstock handling, pretreatment by dilute sulfuric-acid hydrolysis, yeast inoculum production, and simultaneous saccharification and fermentation using a commercially available cellulase enzyme. Although significant operational problems were encountered, as would be expected with the startup of any new plant, operating experience was gained and preliminary data were generated on corn fiber pretreatment and subsequent fermentation of the pretreated material. Bacterial contamination was a significant problem during these fermentations.

  11. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1994-09-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment (QRA). The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, bum pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy [DOE], the US Environmental Protection Agency [EPA], and Washington Department of Ecology [Ecology]) during the preparation of the 100-HR-2 Operable Unit work plan (DOE/RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure (IRM) as per the Hanford Past-Practice Strategy (HPPS) (DOE/RL 1991) and negotiations with DOE, EPA, and Ecology. An IRM is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The investigative phase was conducted in accordance with the RCRA Facility Investigation/Corrective Measures Study Work Plan for the 100-HR-2 Operable Unit (DOE/RL 1993f). The QRA was performed in accordance with the Hanford Site Baseline Risk Assessment Methodology (DOE/RL 1993b) and the recommendations incorporate the strategies of the HPPS. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and (4) provide a human health and ecological QRA associated with solid waste burial grounds

  12. Variable density management in riparian reserves: lessons learned from an operational study in managed forests of western Oregon, USA.

    Science.gov (United States)

    Samuel Chan; Paul Anderson; John Cissel; Larry Lateen; Charley. Thompson

    2004-01-01

    A large-scale operational study has been undertaken to investigate variable density management in conjunction with riparian buffers as a means to accelerate development of late-seral habitat, facilitate rare species management, and maintain riparian functions in 40-70 year-old headwater forests in western Oregon, USA. Upland variable retention treatments include...

  13. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  14. A Time to Build: An Expanded Role for United States Reserve Forces in Central America and the Caribbean

    Science.gov (United States)

    1988-04-01

    constirt-rt broad presidental objectives for a United States Lati- • American strategy (Joint Low Intensity Conflict Proje t 1986, p. 3-6, 6). The...t6) former SOUTHCOM commander, states We are not sending fighting soldiers to these countries (such as Guatemala, Honduras, Colombia, Bolivia, Peru ...The Sendero Luminoso in Rural Peru . In Fauriol. Georoes (Ed.). Latin American Insuroencies. Washinaton D.C.: Georgetown University Center for

  15. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  16. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  17. US Department of Energy Oak Ridge Operations Environmental Management Public Involvement Plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1996-03-01

    This document was prepared in accordance with CERCLA requirements for writing community relations plans. It includes information on how the DOE Oak Ridge Operations Office prepares and executes Environmental Management Community relations activities. It is divided into three sections: the public involvement plan, public involvement in Oak Ridge, and public involvement in 1995. Four appendices are also included: environmental management in Oak Ridge; community and regional overview; key laws, agreements, and policy; and principal contacts

  18. Field Laboratory in the Osage Reservation -- Determination of the Status of Oil and Gas Operations: Task 1. Development of Survey Procedures and Protocols

    Energy Technology Data Exchange (ETDEWEB)

    Carroll, Herbert B.; Johnson, William I.

    1999-04-27

    Procedures and protocols were developed for the determination of the status of oil, gas, and other mineral operations on the Osage Mineral Reservation Estate. The strategy for surveying Osage County, Oklahoma, was developed and then tested in the field. Two Osage Tribal Council members and two Native American college students (who are members of the Osage Tribe) were trained in the field as a test of the procedures and protocols developed in Task 1. Active and inactive surface mining operations, industrial sites, and hydrocarbon-producing fields were located on maps of the county, which was divided into four more or less equal areas for future investigation. Field testing of the procedures, protocols, and training was successful. No significant damage was found at petroleum production operations in a relatively new production operation and in a mature waterflood operation.

  19. Point Beach Nuclear Plant, Units 1 and 2. Semiannual operating report No. 10, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 operated at an average capacity factor of 65.2 percent with a net efficiency of 31.41 percent. Unit 2 operted at an average capacity factor of 88.6 lpercent with a net efficiency of 32.28 percent. Unit 1 was essentially base loaded while Unit 2 operated on load follow. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  20. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  1. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  2. Surry Power Station, Units 1 and 2. Semiannual operating report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    Net electric power generated by Surry Unit 1 was 6,930,353 MWH with the generator on line for 10,417.7 hours. Net electric power generated by Unit 2 was 5,699,299 MWH with the generator on line for 8,384.2 hours. Information is presented concerning operation, radioactive effluent releases, solid radioactive wastes, fuel shipments, occurrences in which temperature limitations on the condenser cooling water discharge were exceeded, changes in station organization, occupational personnel radiation exposure, nonradiological monitoring including thermal, physical, and biological programs, and the radiological environmental monitoring program. (U.S.)

  3. Proposed plan for interim remedial measure at the 100-KR-4 operable unit, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for an interim remedial action plan for the 100-KR-4 Operable Unit at the Hanford Site. The alternative presented is to remove contaminated groundwater from the Unit, treat it by ion exchange, and then dispose of treated groundwater by using upgradient injection wells to return it to the acquifer. This will protect the Columbia River environment from toxic hexavalent chromium. This alternative is the initial recommendation of the EPA, Ecology, and the DOE. Public comment on this plan is invited

  4. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    International Nuclear Information System (INIS)

    Anahara, N.; Yamada, M.; Kataoka, H.

    2000-01-01

    Kashiwazaki-Kariwa Nuclear Power Station Units Nos. 6 and 7, the world's first ABWRs (Advanced Boiling Water Reactor), started commercial operation on November 7, 1996 and July 2, 1997, respectively, and continued their commercial operation with a high capacity factor, low occupational radiation exposure and radioactive waste. Units 6 and 7 were in their 3rd cycle operation until 25th April 1999 and 1st November 1999, respectively. Thermal efficiency was 35.4-35.8% (design thermal efficiency: 34.5%) during these period, demonstrating better performance than that of BWR-5 (design thermal efficiency: 33.4%). Nos. 6 and 7 have experienced 2 annual outages. The first outage of unit No. 6 started on November 20, 1997 and was completed within 61 days (including 6 New Year holidays), and the second outage started on March 13, 1999 and was completed within 44 days. The first annual outage of unit No. 7 started on May 27, 1998, earlier than it would normally have been, to avoid an annual outage during the summer, and was completed within 55 days, and the second outage started on September 18th, 1999 and was completed within 45 days, All annual outages were carried out within a very short time period without any severe malfunctions, including newly designed ABWR systems and equipment. As the first outage in Japan, 55 days is a very short period, despite the fact that the Nos. 6 and 7 are the first ABWRs in the world and the largest capacity units in Japan. The total occupational radiation exposure of No. 6 was 300 man-mSv (1st outage) and 331 man-mSv (2nd outage). That of Unit 7 was 153 man-mSv (1st outage) Those of unit No. 6 were at the same level as those of unit No. 3, which is the latest design 1100MW(e) BWR-5. That of unit No. 7 was the lowest ever at Kashiwazaki-Kariwa nuclear power station. The drums of radioactive waste discharged during the annual outage numbered 54 (1st outage) for No. 6 and 62 (1st outage) for No. 7, which was less than the design target of 100

  5. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  6. Ageing Management of the reactor internals in Belgian nuclear units in view of Long Term Operation

    International Nuclear Information System (INIS)

    Gerard, R.; Bertolis, D.; Vissers, S.

    2012-01-01

    The reactor internals support the reactor core, distribute the coolant flow through the core, and guide and protect the rod control cluster assemblies and in-core instrumentation. Their integrity must be guaranteed in all operating and accident conditions. They are exposed to specific degradation mechanisms linked to the intense neutron irradiation, like Irradiation Assisted Stress Corrosion Cracking (IASCC) or potentially void swelling, in addition to more classical mechanisms like fatigue, wear and stress corrosion cracking. A rigorous follow-up of in-service degradation and an effective ageing management is therefore of crucial importance and contributes to the safe and economical operation of nuclear PWR units. (author)

  7. Dose rate evaluation of workers on the operation floor in Fukushima-Daiichi Unit 3

    Science.gov (United States)

    Matsushita, Kaoru; Kurosawa, Masahiko; Shirai, Keisuke; Matsuoka, Ippei; Mukaida, Naoki

    2017-09-01

    At Fukushima Daiichi Nuclear Power Plant Unit 3, installation of a fuel handling machine is planned to support the removal of spent fuel. The dose rates at the workplace were calculated based on the source distribution measured using a collimator in order to confirm that the dose rates on the operation floor were within a manageable range. It was confirmed that the accuracy of the source distribution was C/M = 1.0-2.4. These dose rates were then used to plan the work on the operation floor.

  8. Computer Drawing Method for Operating Characteristic Curve of PV Power Plant Array Unit

    Science.gov (United States)

    Tan, Jianbin

    2018-02-01

    According to the engineering design of large-scale grid-connected photovoltaic power stations and the research and development of many simulation and analysis systems, it is necessary to draw a good computer graphics of the operating characteristic curves of photovoltaic array elements and to propose a good segmentation non-linear interpolation algorithm. In the calculation method, Component performance parameters as the main design basis, the computer can get 5 PV module performances. At the same time, combined with the PV array series and parallel connection, the computer drawing of the performance curve of the PV array unit can be realized. At the same time, the specific data onto the module of PV development software can be calculated, and the good operation of PV array unit can be improved on practical application.

  9. Steam generator tube integrity requirements and operating experience in the United States

    International Nuclear Information System (INIS)

    Karwoski, K.J.

    2009-01-01

    Steam generator tube integrity is important to the safe operation of pressurized-water reactors. For ensuring tube integrity, the U.S. Nuclear Regulatory Commission uses a regulatory framework that is largely performance based. This performance-based framework is supplemented with some prescriptive requirements. The framework recognizes that there are three combinations of tube materials and heat treatments currently used in the United States and that the operating experience depends, in part, on the type of material used. This paper summarizes the regulatory framework for ensuring steam generator tube integrity, it highlights the current status of steam generators, and it highlights some of the steam generator issues and challenges that exist in the United States. (author)

  10. Operating experience of desalination unit coupled to primary coolant system of CIRUS

    International Nuclear Information System (INIS)

    Ranjan, Rakesh; Kumar, Surinder; Ramesh, N.; Mathur, D.; Sharma, R.C.

    2010-01-01

    Cirus is a 40 MWth, heavy water moderated, light water cooled, natural uranium fuelled research reactor located at Trombay, Mumbai. The reactor had been in operation since 1960 with an average availability factor of about 70% for about three decades. Reactor was shut down in October 1997 for refurbishment and was started back in 2003. Towards improving quality of life of public, since seventies, BARC has been engaged in R and D activities related to desalination. These efforts have led to the successful development of desalination technologies based on Multistage Flash (MSF) evaporation, Reverse Osmosis (RO) and Low Temperature Evaporation (LTE). Using low temperature vacuum evaporation technology, the centre had been studying the possibility of using the waste heat of nuclear reactors for seawater desalination. Based on this know-how, a 30 cubic meter per day (30 ton /day) pilot plant had been designed. With the aim of demonstrating the utilization of waste heat from research reactor, it was decided to integrate the unit to CIRUS during refurbishing outage of the reactor. The work involved design, installation and commissioning of set up to transfer heat from primary coolant of CIRUS to desalination unit through an intermediate demineralized water circuit. The unit was installed and commissioned during refurbishment outage of the reactor. The unit has been operated at its rated capacity and its performance has been satisfactory. The product water has been utilized to augment the demineralized water inventory of primary coolant system after processing it through ion exchanger resin. This paper highlights the experience gained during installation, commissioning and operation of the desalination unit which will be useful for application of the technology of utilization of waste heat. (author)

  11. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    International Nuclear Information System (INIS)

    Cushing, C.E.

    1993-04-01

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations' suitability as indicators of chemical releases during cleanup activities at the US Department of Energy's Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of 60 Co, 90 Sr, and 137 Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area

  12. The new local control systems for operating gaseous diffusion plant units at Pierrelatte

    International Nuclear Information System (INIS)

    Delacroix, C.

    1990-01-01

    The development of a local control network for operating gaseous diffusion plant units is presented. The objective of the control system up date was to replace all the information network hardware. The new generation HP1000 calculators and a network architecture were chosen. The validation tests performed in laboratory and in situ, and the management policies towards the personnel during the technical changes are summarized [fr

  13. Data validation report for the 100-HR-3 Operable Unit, fifth round groundwater samples

    Energy Technology Data Exchange (ETDEWEB)

    Vukelich, S.E. [Kearney (A.T.), Inc., Chicago, IL (United States)

    1994-01-20

    The data from the chemical analysis of 68 samples from the 100-HR-3 Operable Unit Third Quarter 1993 Groundwater Sampling Investigation and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at the site. Sample analysis included inorganics and general chemical parameters. Fifty three samples were validated for radiochemical parameters.

  14. Baseline groundwater model update for p-area groundwater operable unit, NBN

    Energy Technology Data Exchange (ETDEWEB)

    Ross, J. [Savannah River Site (SRS), Aiken, SC (United States); Amidon, M. [Savannah River Site (SRS), Aiken, SC (United States)

    2015-09-01

    This report documents the development of a numerical groundwater flow and transport model of the hydrogeologic system of the P-Area Reactor Groundwater Operable Unit at the Savannah River Site (SRS) (Figure 1-1). The P-Area model provides a tool to aid in understanding the hydrologic and geochemical processes that control the development and migration of the current tritium, tetrachloroethene (PCE), and trichloroethene (TCE) plumes in this region.

  15. Data validation report for the 100-D Ponds Operable Unit: 100-D ponds sampling

    International Nuclear Information System (INIS)

    Stankovich, M.T.

    1994-01-01

    Westinghouse-Hanford has requested that 100 percent of the Sample Delivery Groups be validated for the 100-D Ponds Operable Unit Sampling Investigation. Therefore the data from the chemical analysis of all 30 samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site

  16. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1995-07-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment. The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, burn pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy, the US Environmental Protection Agency, and Washington State Department of Ecology during the preparation of the 100-HR-2 Operable Unit Work Plan (DOE-RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure as per the Hanford Past-Practice Strategy (DOE-RL 1991) and negotiations with the Department of Energy, US Environmental Protection Agency, and Washington State Department of Ecology. An interim remedial measure is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and 4) provide a human health and ecological QRA associated with solid waste burial grounds

  17. Discrete Sampling Test Plan for the 200-BP-5 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, Mark D.

    2010-02-04

    The Discrete Groundwater Sampling Project is conducted by the Pacific Northwest National Laboratory (PNNL) on behalf of CH2M HILL Plateau Remediation Company. The project is focused on delivering groundwater samples from proscribed horizons within select groundwater wells residing in the 200-BP-5 Operable Unit (200-BP-5 OU) on the Hanford Site. This document provides the scope, schedule, methodology, and other details of the PNNL discrete sampling effort.

  18. Contaminant Attenuation and Transport Characterization of 200-DV-1 Operable Unit Sediment Samples

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Szecsody, James E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Qafoku, Nikolla [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Moran, James J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lee, Brady D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Snyder, Michelle M.V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lawter, Amanda R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Resch, Charles T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gartman, Brandy N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhong, Lirong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Nims, Megan K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Saunders, Danielle L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Williams, Benjamin D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Horner, Jacob A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leavy, Ian I. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Baum, Steven R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Christiansen, Beren B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Clayton, Ray E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); McElroy, Erin M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Appriou, Delphine [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tyrrell, Kimberly J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Striluk, Miranda L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-15

    A laboratory study was conducted to quantify contaminant attenuation processes and associated contaminant transport parameters that are needed to evaluate transport of contaminants through the vadose zone to the groundwater. The laboratory study information, in conjunction with transport analyses, can be used as input to evaluate the feasibility of Monitored Natural Attenuation and other remedies for the 200-DV-1 Operable Unit at the Hanford Site.

  19. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E.

    1993-04-01

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations' suitability as indicators of chemical releases during cleanup activities at the US Department of Energy's Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of [sup 60]Co, [sup 90]Sr, and [sup 137]Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area.

  20. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E.

    1993-04-01

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations` suitability as indicators of chemical releases during cleanup activities at the US Department of Energy`s Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of {sup 60}Co, {sup 90}Sr, and {sup 137}Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area.

  1. The Impact of Divorce Among Marines, E-5 and Below, on Unit Operational Readiness

    Science.gov (United States)

    2013-04-12

    where they work, marriage perceived as a rite of passage to adulthood, etc.)? If Marines are, in fact, incentivized to marry at a far higher rate...marital decisions: 1) Mandatory annual training for all Marines, E-5 and below, on the realities of marriage in the Marine Corps; 2) mandatory pre...number of Marines lost to suicide and allowing more time available to train. first-term Marines, divorce, marriage , suicide, unit operational readiness

  2. The Role of the Marine Amphibious Unit, Special Operations Capable in Low Intensity Conflict

    Science.gov (United States)

    1988-05-06

    to "hit the.m where they ain’t," to pit our strength against enemy weakness.. Environmental Verseatility. MAGTFs train in "every clime and place...favor the insurgent who, like a weightlifter , slowly builds his strength on ever-incroasing amounts of weight. Limited War is the involvement of...Marine Corps and its place in the LIC environment. In 19B5 the Marine Corps began training its Marine Amphibious Units (MAU) to be Special Operations

  3. Closing the Door Behind You: How the United States Army Conducts Logistical Withdrawals after Lengthy Operations

    Science.gov (United States)

    2013-05-23

    AirLand Battle doctrine. It remains an active Field Manual. FM 100-9 details the steps to regenerate combat power after extensive attrition by enemy...peace talks in Paris . After a heavy bombing campaign against North Vietnam forced a resumption of negotiations, the United States agreed to a cease-fire...march to Baghdad, hindered mobility throughout urban areas and stability operations. CJTF-7 leaders saw that additional forces would be required to

  4. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  5. Start up and commercial operation of Laguna Verde nuclear power plant. Unit 1

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1991-01-01

    Prior to start up of Laguna Verde nuclear power plant preoperational tests and start tests were performed and they are described in its more eminent aspects. In relation to commercial operation of nuclear station a series of indicator were set to which allow the measurement of performance in unit 1, in areas of plant efficiency and personal safety. Antecedents. Laguna Verde station is located in Alto Lucero municipality in Veracruz state, 70 kilometers north-northeast from port of Veracruz and a 290 kilometers east-northeast from Mexico city. The station consist of two units manufactured by General Electric, with a nuclear system of vapor supply also called boiling water (BWR/5), and with a system turbine-generator manufactured by Mitsubishi. Each unit has a nominal power of 1931 MWt and a level design power of 675 Mwe and a net power of 654 Electric Megawatts

  6. 200-ZP-1 operable unit borehole summary report for FY 1995 and FY 1996

    International Nuclear Information System (INIS)

    Darrach, M.E.

    1996-10-01

    This document details the well construction, sampling, analyses, and geologic character of the Ringold Formation fluvial unit E gravels as encountered in 16 boreholes in the 200-ZP-1 Operable Unit. These boreholes were drilled by Water Development Hanford Corporation during fiscal years 1995 and 1996. Two of the sixteen boreholes were abandoned; the remaining 14 boreholes were completed as functioning production and compliance wells. The borehole logs and well summary sheets included as Appendices A and B of this document, respectively, depict and describe the vadose zone stratigraphic units encountered during the course of drilling. Appendix C contains the results of sieve analyses conducted on samples obtained via resonant sonic coring and standard split-spoon methods. The sieve analyses were the driver behind the majority of the well designs. Also, for completeness, Appendices D and E contain the well design calculations and the well development process

  7. The improvement for PWR secondary system integrity at Tomari Unit 3 commercial operation from 2009

    International Nuclear Information System (INIS)

    Sasaki, Keisuke; Hayakawa, Hitoshi; Nakahama, Satoshi; Aizawa, Yamato; Shoda, Yasuhiko; Yamakami, Katsuhiko; Murata, Kazutoyo; Kanedome, Masato

    2014-01-01

    In Tomari Unit 3 (PWR, 912 MWe, 3-loops, commercial operation started from 2009), secondary system has been adopted high pH (pH 10) treatment and introduced the improved systems for long term plant integrity from commissioning stage. Specifically, high pH (pH 10) treatment and material improvement are applied to suppress flow accelerated corrosion (FAC) and steam generator (SG) fouling. Steam generator blow down (SGBD) heat recovery and clean up system (SGBD water is cooled and recovered to up-stream of condensate demineralizer (C/D)) was adopted to remove SG impurities efficiently. Condensate filtering system and elimination of the copper alloy for heat exchangers are also introduced. Tomari Unit 3 high pH treatment successfully achieves low iron concentration around 1 ppb in the feed water. Impurities concentrations in SGBD water are also low (Na, Cl, SO 4 : 0.1 ∼ 0.2 ppb) by adopting SGBD heat recovery and clean up system which are equivalent to those in a plant operated with full flow condensate demineralizer. These results mitigate the FAC issue, long term SG fouling, SG tube degradation concurrently. The condensate filtering system can decrease not only iron inflow to feed water during operation, but can shorten the clean-up process and reduce total amount of makeup water during the start-up stage. This paper gives introduction to the Tomari Unit 3 improved secondary systems and its effective results. (author)

  8. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    Science.gov (United States)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.

  9. Enhanced teaching and student learning through a simulator-based course in chemical unit operations design

    Science.gov (United States)

    Ghasem, Nayef

    2016-07-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes through simulators. A case study presenting the teaching method was evaluated using student surveys and faculty assessments, which were designed to measure the quality and effectiveness of the teaching method. The results of the questionnaire conclusively demonstrate that this method is an extremely efficient way of teaching a simulator-based course. In addition to that, this teaching method can easily be generalised and used in other courses. A student's final mark is determined by a combination of in-class assessments conducted based on cooperative and peer learning, progress tests and a final exam. Results revealed that peer learning can improve the overall quality of student learning and enhance student understanding.

  10. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  11. 40 CFR 60.1200 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 60.1200 Section 60.1200 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Good Combustion Practices: Operating Requirements § 60.1200 What are the operating practice...

  12. 78 FR 13384 - In the Matter of FirstEnergy Nuclear Operating Co. (Beaver Valley Units 1 and 2); Confirmatory...

    Science.gov (United States)

    2013-02-27

    ... and NPF-73; EA-12-254] In the Matter of FirstEnergy Nuclear Operating Co. (Beaver Valley Units 1 and 2... operation of the Beaver Valley Power Station, Units 1 and 2 (Beaver Valley, facility), in accordance with..., the licensee described its progress for transitioning Beaver Valley to NFPA 805. FENOC also notified...

  13. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Woongryol, E-mail: wrlee@nfri.re.kr; Lee, Taegu; Hong, Jaesic

    2016-11-15

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  14. A Mathematical Model and Its Application for Hydro Power Units under Different Operating Conditions

    Directory of Open Access Journals (Sweden)

    Weijia Yang

    2015-09-01

    Full Text Available This paper presents a mathematical model of hydro power units, especially the governor system model for different operating conditions, based on the basic version of the software TOPSYS. The mathematical model consists of eight turbine equations, one generator equation, and one governor equation, which are solved for ten unknown variables. The generator and governor equations, which are different under various operating conditions, are presented and discussed in detail. All the essential non-linear factors in the governor system (dead-zone, saturation, rate limiting, and backlash are also considered. Case studies are conducted based on one Swedish hydro power plant (HPP and three Chinese plants. The simulation and on-site measurements are compared for start-up, no-load operation, normal operation, and load rejection in different control modes (frequency, opening, and power feedback. The main error in each simulation is also discussed in detail. As a result, the model application is proved trustworthy for simulating different physical quantities of the unit (e.g., guide vane opening, active power, rotation speed, and pressures at volute and draft tube. The model has already been applied effectively in consultant analyses and scientific studies.

  15. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context

    Directory of Open Access Journals (Sweden)

    Peio Lopez-Iturri

    2018-01-01

    Full Text Available In the context of hospital management and operation, Intensive Care Units (ICU are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework.

  16. Operational Evaluation of VEGGIE Food Production System in the Habitat Demonstration Unit

    Science.gov (United States)

    Stutte, Gary W.; Newsham, Gerard; Morrow, Robert M.; Wheeler, Raymond M.

    2011-01-01

    The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSan(tm) as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

  17. Operation Evaluation of the VEGGIE Food Production System in the Habitat Demonstration Unit

    Science.gov (United States)

    Stutte, Gary W.; Newsham, Gerard; Morrow, Robert M.; Wheeler, Raymond M.

    2011-01-01

    The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSantm as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

  18. Regulating manure application discharges from concentrated animal feeding operations in the United States

    International Nuclear Information System (INIS)

    Centner, Terence J.; Feitshans, Theodore A.

    2006-01-01

    In the United States, reducing pollution from agriculture has received attention due to data suggesting that this is the leading source of impairment of many waterbodies. The federal government revised its regulations governing concentrated animal feeding operations (CAFOs) to enhance governmental oversight over sources of pollution. For the application of manure resulting in pollutant discharges, CAFOs need to implement nutrient management plans. A federal court affirmed the ability of the US federal government to oversee the application of manure from CAFOs that have discharges. Simultaneously, owners and operators of CAFOs who have implemented an appropriate nutrient management plan may forgo securing a permit if their discharges qualify under the agricultural stormwater discharge exemption. - New rules applying to the application of manure by large concentrated animal feeding operations should reduce water contamination

  19. Operation of Beaver Valley Power Station, Unit 2, Docket No. 50-412, Beaver County, Pennsylvania

    International Nuclear Information System (INIS)

    1985-09-01

    The final environmental impact statement (EPA No. 850438F) assesses the effects of operating a pressurized water reactor in Pennsylvania on the south bank of the Ohio River, which would serve as the final heat sink for the cooling system. Operation of Unit 2 would add 836 MW of capacity and increase system reliability. The plant would employ 465 at an $18 million payroll. Facilities for the plant would take up 56 acres of agricultural land. The operation result in both water and noise pollution. There is only a small probability of impacts due to potential radiation exposure. The Federal Water Pollution Control Act of 1972 and Nuclear Regulatory Commission Regulations require the impact statement

  20. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC)

    OpenAIRE

    Mohammad Javad Abdollahi; Majid Moazzami

    2015-01-01

    In this paper security constraints unit commitment (SCUC) in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested...

  1. Development of in situ product removal strategies in biocatalysis applying scaled-down unit operations.

    Science.gov (United States)

    Heintz, Søren; Börner, Tim; Ringborg, Rolf H; Rehn, Gustav; Grey, Carl; Nordblad, Mathias; Krühne, Ulrich; Gernaey, Krist V; Adlercreutz, Patrick; Woodley, John M

    2017-03-01

    An experimental platform based on scaled-down unit operations combined in a plug-and-play manner enables easy and highly flexible testing of advanced biocatalytic process options such as in situ product removal (ISPR) process strategies. In such a platform, it is possible to compartmentalize different process steps while operating it as a combined system, giving the possibility to test and characterize the performance of novel process concepts and biocatalysts with minimal influence of inhibitory products. Here the capabilities of performing process development by applying scaled-down unit operations are highlighted through a case study investigating the asymmetric synthesis of 1-methyl-3-phenylpropylamine (MPPA) using ω-transaminase, an enzyme in the sub-family of amino transferases (ATAs). An on-line HPLC system was applied to avoid manual sample handling and to semi-automatically characterize ω-transaminases in a scaled-down packed-bed reactor (PBR) module, showing MPPA as a strong inhibitor. To overcome the inhibition, a two-step liquid-liquid extraction (LLE) ISPR concept was tested using scaled-down unit operations combined in a plug-and-play manner. Through the tested ISPR concept, it was possible to continuously feed the main substrate benzylacetone (BA) and extract the main product MPPA throughout the reaction, thereby overcoming the challenges of low substrate solubility and product inhibition. The tested ISPR concept achieved a product concentration of 26.5 g MPPA  · L -1 , a purity up to 70% g MPPA  · g tot -1 and a recovery in the range of 80% mol · mol -1 of MPPA in 20 h, with the possibility to increase the concentration, purity, and recovery further. Biotechnol. Bioeng. 2017;114: 600-609. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  2. The nuclear industry's transition to risk-informed regulation and operation in the United States

    International Nuclear Information System (INIS)

    Kadak, Andrew C.; Matsuo, Toshihiro

    2007-01-01

    This paper summarizes a study of the transition of the United States nuclear industry from a prescriptive regulatory structure to a more risk informed approach to operations and regulations. The transition occurred over a 20 yr period in which gradual changes were made in the fundamental regulations and to the approach to nuclear safety and operations. While the number of actual regulatory changes were few, they are continuing. The utilities that embraced risk informed operations made dramatic changes in the way they approached operations and outage management. Those utilities that used risk in operations showed dramatic improvement in safety based on Institute of Nuclear Power Operations (INPO) performance indicators. It was also shown that the use of risk did not negatively affect safety performance of the plants compared to standard prescriptive approaches. This was despite having greater flexibility in compliance to regulatory standards and the use of the newly instituted risk-informed reactor oversight process. Key factors affecting the successful transition to a more risk-informed approach to regulations and operations are: strong top management support and leadership both at the regulator and the utility; education and training in risk principles and probabilistic risk Assessment tools for engineers, operators and maintenance staff; a slow and steady introduction of risk initiatives in areas that can show value to both the regulator and the industry; a transparent regulatory foundation built around a safety goal policy and the development of a strong safety culture at the utility to allow for more independence in safety compliance and risk management. The experience of the United States shows positive results in both safety and economics. The INPO and NRC metrics presented show that the use of risk information in operations and regulation is marginally better with no degradation in safety when plants that have embraced risk-informed approaches are compared

  3. Microbiological and aflatoxin evaluation of Brazil nut pods and the effects of unit processing operations.

    Science.gov (United States)

    Arrus, Katia; Blank, Greg; Clear, Randall; Holley, Richard A; Abramson, David

    2005-05-01

    Harvesting of Brazil nuts not only helps to preserve the Amazon rainforest but also provides income to individuals who would otherwise have little means of making a livelihood. Recently, the European Community has tightened the quality requirements for Brazil nuts, particularly with regard to aflatoxin levels and microbiological contamination. The objectives of this research were to gain a better understanding of the origin of aflatoxins on Brazil nuts and to microbiologically evaluate some of the operations involved in processing. In this regard, five Brazil nut pods were aseptically picked from trees located in each of three concessions of the Peruvian Amazon rainforest (Madre de Dios province). The exteriors of the pods and the nuts were examined for yeast and molds, including Aspergillus flavus and Aspergillus parasiticus, and for bacteria, including Salmonella and Escherichia coli. Brazil nuts obtained from various commercial process operations located in Peru were similarly evaluated. Exteriors of all Brazil nut pods did not contain A. parasiticus, and only pods from one concession yielded A. flavus isolates. All isolates tested were aflatoxigenic (630 to 915 ppb total aflatoxin). Coliforms, E. coli, and salmonellae were not recovered from any of the pods. Whole, in-shell nuts obtained after opening the pods yielded no A. flavus or A. parasiticus. Aflatoxins were not detected (detection limit 1.75 ppb) in any of the nuts. Whole, in-shell and shelled nuts from various process operations were all positive for A. flavus but negative for E. coli and salmonellae. Soaking of whole, in-shell nuts before cracking or shelling increased coliform numbers, whereas levels of A. flavus decreased. In order to gain a better understanding of the sanitary performance of the unit process operations, additional evaluations should be conducted on product lots processed on different days. Also, the microbiology of product processed from common lots should be followed through the

  4. Unit operations used to treat process and/or waste streams at nuclear power plants

    International Nuclear Information System (INIS)

    Godbee, H.W.; Kibbey, A.H.

    1980-01-01

    Estimates are given of the annual amounts of each generic type of LLW [i.e., Government and commerical (fuel cycle and non-fuel cycle)] that is generated at LWR plants. Many different chemical engineering unit operations used to treat process and/or waste streams at LWR plants include adsorption, evaporation, calcination, centrifugation, compaction, crystallization, drying, filtration, incineration, reverse osmosis, and solidification of waste residues. The treatment of these various streams and the secondary wet solid wastes thus generated is described. The various treatment options for concentrates or solid wet wastes, and for dry wastes are discussed. Among the dry waste treatment methods are compaction, baling, and incineration, as well as chopping, cutting and shredding. Organic materials [liquids (e.g., oils or solvents) and/or solids], could be incinerated in most cases. The filter sludges, spent resins, and concentrated liquids (e.g., evaporator concentrates) are usually solidified in cement, or urea-formaldehyde or unsaturated polyester resins prior to burial. Incinerator ashes can also be incorporated in these binding agents. Asphalt has not yet been used. This paper presents a brief survey of operational experience at LWRs with various unit operations, including a short discussion of problems and some observations on recent trends

  5. Operations for hernia and varicose veins in a day-bed unit.

    Science.gov (United States)

    Goulbourne, I A; Ruckley, C V

    1979-01-01

    Over eight years (1970-8) 1055 patients underwent operations for hernia or "major" varicose veins in a day-bed unit. Here, 608 were discharged home on the day of operation, 262 were transferred to a convalescent hospital for 48 hours, and 161 were retained in the acute ward as part of a controlled trial. Special emphasis was placed on selection and preadmission screening. Failure of planning was uncommon in that only 2.5% were detained in hospital and 1% had to be readmitted. About one-quarter of the patients had complications but these were generally trivial and were satisfactorily treated by the community nursing sisters or general practitioners, or both. Analysis of the total operations for hernia or varicose veins in the unit over the past 19 years shows that, whereas formerly all patients with these conditions were admitted to the main surgical ward, nowadays almost all are managed either by day care or in a five-day ward. PMID:509075

  6. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H.; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2010-01-01

    The Applied Meteorology Unit (AMU) provides technology transition and technique development to improve operational weather support to the Space Shuttle and the entire American space program. The AMU is funded and managed by NASA and operated by a contractor that provides five meteorologists with a diverse mix of advanced degrees, operational experience, and associated skills including data processing, statistics, and the development of graphical user interfaces. The AMU's primary customers are the U.S. Air Force 45th Weather Squadron at Patrick Air Force Base, the National Weather Service Spaceflight Meteorology Group at NASA Johnson Space Center, and the National Weather Service Melbourne FL Forecast Office. The AMU has transitioned research into operations for nineteen years and worked on a wide range of topics, including new forecasting techniques for lightning probability, synoptic peak winds,.convective winds, and summer severe weather; satellite tools to predict anvil cloud trajectories and evaluate camera line of sight for Space Shuttle launch; optimized radar scan strategies; evaluated and implemented local numerical models; evaluated weather sensors; and many more. The AMU has completed 113 projects with 5 more scheduled to be completed by the end of 2010. During this rich history, the AMU and its customers have learned many lessons on how to effectively transition research into operations. Some of these lessons learned include collocating with the operational customer and periodically visiting geographically separated customers, operator submitted projects, consensus tasking process, use of operator primary advocates for each project, customer AMU liaisons with experience in both operations and research, flexibility in adapting the project plan based on lessons learned during the project, and incorporating training and other transition assistance into the project plans. Operator involvement has been critical to the AMU's remarkable success and many awards

  7. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  8. Dresden Nuclear Power Station, Units 1, 2, and 3. Semiannual report on operating and maintenance, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 388,882 MWH(e) and was on line 3111.2 hours, Unit 2 generated 1,204,106 MWH(e) and was on line 2013.4 hours, and Unit 3 generated 2,250,810 MWH(e) and was on line 3836 hours. Information is presented concerning operations, shutdowns, maintenance, changes, tests, and experiments for the three units. (U.S.)

  9. Multiobjective Optimization of a Counterrotating Type Pump-Turbine Unit Operated at Turbine Mode

    Directory of Open Access Journals (Sweden)

    Jin-Hyuk Kim

    2014-05-01

    Full Text Available A multiobjective optimization for improving the turbine output and efficiency of a counterrotating type pump-turbine unit operated at turbine mode was carried out in this work. The blade geometry of both the runners was optimized using a hybrid multiobjective evolutionary algorithm coupled with a surrogate model. Three-dimensional Reynolds-averaged Navier-Stokes equations with the shear stress transport turbulence model were discretized by finite volume approximations and solved on hexahedral grids to analyze the flow in the pump-turbine unit. As major hydrodynamic performance parameters, the turbine output and efficiency were selected as objective functions with two design variables related to the hub profiles of both the runner blades. These objectives were numerically assessed at twelve design points selected by Latin hypercube sampling in the design space. Response surface approximation models for the objectives were constructed based on the objective function values at the design points. A fast nondominated sorting genetic algorithm for the local search coupled with the response surface approximation models was applied to determine the global Pareto-optimal solutions. The trade-off between the two objectives was determined and described with respect to the Pareto-optimal solutions. The results of this work showed that the turbine outputs and efficiencies of optimized pump-turbine units were simultaneously improved in comparison to the reference unit.

  10. Scale-up of a mixer-settler extractor using a unit operations approach

    International Nuclear Information System (INIS)

    Lindholm, D.C.; Bautista, R.G.

    1976-01-01

    The results of scale-up studies on a continuous, multistage horizontal mixer-settler extractor are presented. The chemical and mechanical system involves the separation of lanthanum from a mixture of rare earth chlorides using di(2-ethylhexyl) phosphoric acid as the solvent and dilute HCl as a scrub solution in a bench scale extractor. Each stage has a hold-up of 2.6 l. A single stage unit is utilized for scale-up studies. Results are obtained on four sizes of geometrically similar units, the largest being six times the volume of the original bench size. A unit operations technique is chosen so that mixing and settling can be examined independently. Variables examined include type of continuous phase, flow rate of inlet streams, and power input to the mixer. Inlet flow-rate ratios are kept constant for all tests. Two potential methods of unbaffled pump-mixer scale-up are explored; the maintenance of constant impeller tip speed and constant power input. For the settler, the previously successful method of basing design on constant flow-rate per unit cross-sectional area is used

  11. Risk assessment on the preventive maintenance of Ulchin units 3 and 4 during power operation

    International Nuclear Information System (INIS)

    Kang, Dae Il; Kim, See Darl; Jang, Seung Chul; Kim Kil Yoo; Ha, Jae Joo

    2000-01-01

    In this paper, the risk assessments on the change of AOTs and the PM during power operation of major safety systems for Ulchin Units 3 and 4 were performed to identify the possibility of on-line maintenance of them. From a point of vies of risk assessment, the results of this study show that the current AOTs of LPSIS, SCS, and CSS can be increased to 7 days and that of EDG to 10 days. Also, the results show that on-line maintenance of LPSIS< SCS, CSS, EDG, ECWS, ESWS, and CCWS for Ulchin Units 3 and 4 can be performed without increasing the risk greatly. It is expected that the PM at power for the systems mentioned in this study will decrease the shutdown period for refueling more than 2 days. (author)

  12. Cooling unit for a superconducting power cable. Two years successful operation

    Energy Technology Data Exchange (ETDEWEB)

    Herzog, Friedhelm [Messer Group GmbH, Krefeld (Germany); Kutz, Thomas [Messer Industriegase GmbH, Bad Soden (Germany); Stemmle, Mark [Nexans Deutschland GmbH, Hannover (Germany); Kugel, Torsten [Westnetz GmbH, Essen (Germany)

    2016-07-01

    High temperature super conductors (HTS) can efficiently be cooled with liquid nitrogen down to a temperature of 64 K (-209 C). Lower temperatures are not practical, because nitrogen becomes solid at 63 K (-210 C). To achieve this temperature level the coolant has to be vaporized below atmospheric pressure. Messer has developed a cooling unit with an adequate vacuum subcooler, a liquid nitrogen circulation system, and a storage vessel for cooling an HTS power cable. The cooling unit was delivered in 2013 for the German AmpaCity project of RWE Deutschland AG, Nexans and Karlsruhe Institute of Technology. Within this project RWE and Nexans installed the worldwide longest superconducting power cable in the city of Essen, Germany. The cable is in operation since March 10th, 2014.

  13. Selection of Forklift Unit for Warehouse Operation by Applying Multi-Criteria Analysis

    Directory of Open Access Journals (Sweden)

    Predrag Atanasković

    2013-07-01

    Full Text Available This paper presents research related to the choice of the criteria that can be used to perform an optimal selection of the forklift unit for warehouse operation. The analysis has been done with the aim of exploring the requirements and defining relevant criteria that are important when investment decision is made for forklift procurement, and based on the conducted research by applying multi-criteria analysis, to determine the appropriate parameters and their relative weights that form the input data and database for selection of the optimal handling unit. This paper presents an example of choosing the optimal forklift based on the selected criteria for the purpose of making the relevant investment decision.

  14. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  15. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449 ampersand D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit

  16. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449&D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit.

  17. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  18. Investigation on Main Radiation Source at Operation Floor of Fukushima Daiichi Nuclear Power Station Unit 4

    Science.gov (United States)

    Hirayama, Hideo; Kondo, Kenjiro; Suzuki, Seishiro; Hamamoto, Shimpei; Iwanaga, Kohei

    2017-09-01

    Pulse height distributions were measured using a LaBr3 detector set in a 1 cm lead collimator to investigate main radiation source at the operation floor of Fukushima Daiichi Nuclear Power Station Unit 4. It was confirmed that main radiation source above the reactor well was Co-60 from the activated steam dryer in the DS pool (Dryer-Separator pool) and that at the standby area was Cs-134 and Cs-137 from contaminated buildings and debris at the lower floor. Full energy peak count rate of Co-60 was reduced about 1/3 by 12mm lead sheet placed on the floor of the fuel handling machine.

  19. Operational Stress Control and Readiness (OSCAR): The United States Marine Corps Initiative to Deliver Mental Health Services to Operating Forces

    National Research Council Canada - National Science Library

    Nash, William P

    2006-01-01

    Combat/operational stress control, defined as programs and policies to prevent, identify, and manage adverse combat/operational stress reactions, is the primary responsibility of military commanders...

  20. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  1. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  2. Survey of glaucoma surgical preferences and post-operative care in the United Kingdom.

    Science.gov (United States)

    Rodriguez-Una, Ignacio; Azuara-Blanco, Augusto; King, Anthony J

    2017-04-01

    To evaluate the spectrum of glaucoma surgery and the post-operative follow-up regimes undertaken among glaucoma specialists in the United Kingdom. National survey. Seventy-five glaucoma specialists (consultants and fellows). An eight-question survey was emailed to all glaucoma subspecialists members of the United Kingdom and Eire Glaucoma Society. Surgery undertaken, post-operative management, awareness of intervention tariff and handling of the follow-up burden generated through surgery. Almost all the participants (74/75: 99%) routinely performed trabeculectomy, 54 responders (72%) undertook tube surgery and Minimally Invasive Glaucoma Surgery (MIGS) was more frequently undertaken (33.0%) than non-penetrating surgery (23%). In general, for patients with advanced glaucoma requiring a low target intraocular pressure (IOP), the most frequent primary intervention was trabeculectomy (99%), followed by tubes (64%). Similarly, in patients with less advanced glaucoma requiring moderate target IOP, participants preferred trabeculectomy (99%), followed by MIGS (60%). By the first 6 months after the procedure, trabeculectomy and Baerveldt tube implant required a larger number of postoperative visits (9 and 7, respectively), than iStent® and non-penetrating deep sclerectomy (3 and 5, respectively). The majority of participants were not aware of the costs of their interventions. A wide variety of glaucoma surgery techniques are undertaken. Post-operative follow-up regimes are variable between techniques and for surgeons using the same technique. Trabeculectomy requires more follow-up than any other intervention. For patients requiring low IOP, trabeculectomy is the operation of choice for most surgeons. © 2016 Royal Australian and New Zealand College of Ophthalmologists.

  3. Light weight portable operator control unit using an Android-enabled mobile phone

    Science.gov (United States)

    Fung, Nicholas

    2011-05-01

    There have been large gains in the field of robotics, both in hardware sophistication and technical capabilities. However, as more capable robots have been developed and introduced to battlefield environments, the problem of interfacing with human controllers has proven to be challenging. Particularly in the field of military applications, controller requirements can be stringent and can range from size and power consumption, to durability and cost. Traditional operator control units (OCUs) tend to resemble laptop personal computers (PCs), as these devices are mobile and have ample computing power. However, laptop PCs are bulky and have greater power requirements. To approach this problem, a light weight, inexpensive controller was created based on a mobile phone running the Android operating system. It was designed to control an iRobot Packbot through the Army Research Laboratory (ARL) in-house Agile Computing Infrastructure (ACI). The hardware capabilities of the mobile phone, such as Wi- Fi communications, touch screen interface, and the flexibility of the Android operating system, made it a compelling platform. The Android based OCU offers a more portable package and can be easily carried by a soldier along with normal gear requirements. In addition, the one hand operation of the Android OCU allows for the Soldier to keep an unoccupied hand for greater flexibility. To validate the Android OCU as a capable controller, experimental data was collected evaluating use of the controller and a traditional, tablet PC based OCU. Initial analysis suggests that the Android OCU performed positively in qualitative data collected from participants.

  4. Solving optimum operation of single pump unit problem with ant colony optimization (ACO) algorithm

    International Nuclear Information System (INIS)

    Yuan, Y; Liu, C

    2012-01-01

    For pumping stations, the effective scheduling of daily pump operations from solutions to the optimum design operation problem is one of the greatest potential areas for energy cost-savings, there are some difficulties in solving this problem with traditional optimization methods due to the multimodality of the solution region. In this case, an ACO model for optimum operation of pumping unit is proposed and the solution method by ants searching is presented by rationally setting the object function and constrained conditions. A weighted directed graph was constructed and feasible solutions may be found by iteratively searching of artificial ants, and then the optimal solution can be obtained by applying the rule of state transition and the pheromone updating. An example calculation was conducted and the minimum cost was found as 4.9979. The result of ant colony algorithm was compared with the result from dynamic programming or evolutionary solving method in commercial software under the same discrete condition. The result of ACO is better and the computing time is shorter which indicates that ACO algorithm can provide a high application value to the field of optimal operation of pumping stations and related fields.

  5. Overview of the Habitat Demonstration Unit Power System Integration and Operation at Desert RATS 2010

    Science.gov (United States)

    Colozza, Anthony J.; George, Pat; Gambrell, Ronnie; Chapman, Chris

    2013-01-01

    A habitat demonstration unit (HDU) was constructed at NASA Johnson Space Center (JSC) and designed by a multicenter NASA team led out of NASA Kennedy Space Center (KSC). The HDU was subsequently utilized at the 2010 Desert Research and Technology Studies (RATS) program held at the Black Point Lava Flow in Arizona. This report describes the power system design, installation and operation for the HDU. The requirements for the power system were to provide 120 VAC, 28 VDC, and 120 VDC power to the various loads within the HDU. It also needed to be capable of providing power control and real-time operational data on the load's power consumption. The power system had to be capable of operating off of a 3 phase 480 VAC generator as well as 2 solar photovoltaic (PV) power systems. The system operated well during the 2 week Desert RATS campaign and met all of the main goals of the system. The power system is being further developed to meet the future needs of the HDU and options for this further development are discussed.

  6. Operation time extension for power units of the first generation NPP and the liability for potential damage

    International Nuclear Information System (INIS)

    Kovalevich, O.M.

    2000-01-01

    The problem on the operation time extension for the six operating NPP first generation power units is discussed. However it is not advisable to improve the safety of these power units up to the acceptable level, therefore there arises the contradiction between the operation time extension of these power units and potential damage for the population. The possibility of having the increased civilian-legal responsibility for potential harm and losses in case of an accident is proposed to be considered as a compensating measure. The measures for realization of this civilian-legal responsibility are described [ru

  7. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This volume is in support of the findings of an investigation into contamination of the Clinch River and Poplar Creek near the Oak Ridge Reservation (for more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities there). It addresses the quality assurance objectives for measuring the data, presents selected historical data, contains data from several discrete water characterization studies, provides data supporting the sediment characterization, and contains data related to several biota characterization studies.

  8. Screening of Potential Remediation Methods for the 200-ZP-1 Operable Unit at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J.; Nimmons, Michael J.; Johnson, Christian D.; Dresel, P EVAN.; Murray, Christopher J.

    2006-08-07

    A screening-level evaluation of potential remediation methods for application to the contaminants of concern (COC) in the 200-ZP-1 Operable Unit at the Hanford Site was conducted based on the methods outlined in the Guidance for Conducting Remedial Investigations and Feasibility Studies under CERCLA Interim Final. The scope of this screening was to identify the most promising remediation methods for use in the more detailed analysis of remediation alternatives that will be conducted as part of the full feasibility study. The screening evaluation was conducted for the primary COC (potential major risk drivers). COC with similar properties were grouped for the screening evaluation. The screening evaluation was conducted in two primary steps. The initial screening step evaluated potential remediation methods based on whether they can be effectively applied within the environmental setting of the 200-ZP-1 Operable Unit for the specified contaminants. In the second step, potential remediation methods were screened using scoping calculations to estimate the scale of infrastructure, overall quantities of reagents, and conceptual approach for applying the method for each defined grouping of COC. Based on these estimates, each method was screened with respect to effectiveness, implementability, and relative cost categories of the CERCLA feasibility study screening process defined in EPA guidance.

  9. Explicit isospectral flows associated to the AKNS operator on the unit interval. II

    Science.gov (United States)

    Amour, Laurent

    2012-10-01

    Explicit flows associated to any tangent vector fields on any isospectral manifold for the AKNS operator acting in L2 × L2 on the unit interval are written down. The manifolds are of infinite dimension (and infinite codimension). The flows are called isospectral and also are Hamiltonian flows. It is proven that they may be explicitly expressed in terms of regularized determinants of infinite matrix-valued functions with entries depending only on the spectral data at the starting point of the flow. The tangent vector fields are decomposed as ∑ξkTk where ξ ∈ ℓ2 and the Tk ∈ L2 × L2 form a particular basis of the tangent vector spaces of the infinite dimensional manifold. The paper here is a continuation of Amour ["Explicit isospectral flows for the AKNS operator on the unit interval," Inverse Probl. 25, 095008 (2009)], 10.1088/0266-5611/25/9/095008 where, except for a finite number, all the components of the sequence ξ are zero in order to obtain an explicit expression for the isospectral flows. The regularized determinants induce counter-terms allowing for the consideration of finite quantities when the sequences ξ run all over ℓ2.

  10. Preliminary remedial action objectives for the Tank 16 groundwater operable unit

    International Nuclear Information System (INIS)

    Miles, W.C. Jr.

    1992-01-01

    Tank 16 is a High Level Radioactive Waste tank in the H-Area Tank Farm on the Savannah River Site that was placed into service in May 1959. A leak was detected in one of the construction weld joints while the tank was being filled. Before jet evacuation of the tank waste was completed, the leak overflowed the annulus pan and an estimated 16 to 700 gallons of waste escaped to the environment (soil and groundwater) over a six hour period contaminating approximately 1,600--70,000 cubic feet of soil with up to 5000 curies of activity (principally Cs 137 ). The Tank 16 bottom is constructed below the groundwater table which resulted in almost immediate contamination of that medium. Low groundwater flow rates, the ion exchange property of adjacent soils, and the distance to the nearest surface water bodies (1,500 to 8,000 feet) indicates that surface water and sediment outcrop of contaminates may be expected between 44 and 530 years (Poe et al., 1974). Remedial action objectives consist of medium-specific and operable unit specific goals for protecting human health and the environment. These objectives are specific and do not limit the range of alternatives that may be developed.A range of remedial technologies, which provides for treatment, containment, and removal requirements of contaminated media remaining at the Tank 16 groundwater operable unit, is identified and developed for each general response action

  11. 76 FR 77528 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Science.gov (United States)

    2011-12-13

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling parties: Pick-Your-Part Auto Wrecking; Hayward Associates, LLC; and PNM Properties, LLC. The settlement requires the settling parties to pay a total of $102,161 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling parties pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles, CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  12. 76 FR 79678 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Science.gov (United States)

    2011-12-22

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling parties: Pick-Your-Part Auto Wrecking; Hayward Associates, LLC; and PNM Properties, LLC. The settlement requires the settling parties to pay a total of $102,161 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling parties pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles, CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  13. 77 FR 123 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Science.gov (United States)

    2012-01-03

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling party: Waste Management Recycling & Disposal Services of California, Inc., dba Bradley Landfill & Recycling Center. The settlement requires the settling party to pay a total of $185,734 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling party pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  14. Report on geological surveys in the 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Sandness, G.A.

    1991-03-01

    This report describes a set of geophysical surveys performed by the Pacific Northwest Laboratory at selected locations within the 300-FF-1 Operable Unit at Hanford. Field work and preliminary data processing activities were initiated in September 1989. These actions were terminated by the Westinghouse Hanford Company before completion in December 1989. Work was reinitiated in October 1990, to complete the processing of the data that had already been collected and to report the results. Because the field work was only partially completed, the task objectives, as presented in the Statement of Work, could not be fully met. This report is, therefore, a progress report covering the work performed through December 11, 1989. This task involved (1) ground-penetrating radar surveys of the 618-4 and 618-5 Burial Grounds, and (2) ground-penetrating radar and electromagnetic induction surveys along the assumed routes of the abandoned process sewers and radioactive liquid waste sewers in the 300-FF-1 Operable Unit. The surveys in the burial grounds were intended to identify burial trenches and pits, to determine the depth of fill, and to locate waste materials, including any that might be outside the perimeter fences. The surveys along the sewer routes were intended, first, to confirm the locations of the sewers as shown on existing maps or to otherwise accurately determine their locations, and second, to attempt to identify locations of possible leaks. 3 refs., 3 figs., 2 tabs

  15. Current Conditions Risk Assessment for the 300-FF-5 Groundwater Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Miley, Terri B.; Bunn, Amoret L.; Napier, Bruce A.; Peterson, Robert E.; Becker, James M.

    2007-11-01

    This report updates a baseline risk assessment for the 300 Area prepared in 1994. The update includes consideration of changes in contaminants of interest and in the environment that have occurred during the period of interim remedial action, i.e., 1996 to the present, as well as the sub-regions, for which no initial risk assessments have been conducted. In 1996, a record of decision (ROD) stipulated interim remedial action for groundwater affected by releases from 300 Area sources, as follows: (a) continued monitoring of groundwater that is contaminated above health-based levels to ensure that concentrations continue to decrease, and (b) institutional controls to ensure that groundwater use is restricted to prevent unacceptable exposure to groundwater contamination. In 2000, the groundwater beneath the two outlying sub-regions was added to the operable unit. In 2001, the first 5-year review of the ROD found that the interim remedy and remedial action objectives were still appropriate, although the review called for additional characterization activities. This report includes a current conditions baseline ecological and human health risk assessment using maximum concentrations in the environmental media of the 300-FF-5 Operable Unit and downstream conditions at the City of Richland, Washington. The scope for this assessment includes only current measured environmental concentrations and current use scenarios. Future environmental concentrations and future land uses are not considered in this assessment.

  16. ENHANCING THE OPERATIONAL EFFICIENCY OF DIRECT CURRENT DRIVE BASED ON USE OF SUPERCONDENSER POWER STORAGE UNITS

    Directory of Open Access Journals (Sweden)

    А. M. Mukha

    2017-10-01

    Full Text Available Purpose.The scientific work is intended to analyse the expansion of the load range and the implementation of regeneration braking (RB of the direct current drive by using the supercondenser power storage units. Methodology.To solve the problem, we use the methods of the electric drive theory, impulse electronics and the method of calculation of transient electromagnetic processes in linear electric circuits in the presence of super-condensers therein. Findings.The stiffness of the mechanical and electromechanical characteristics of a series motor is significantly increased, which makes it possible to use a DC drive under load, much smaller than 15…20% of the nominal one. Numerical calculations of the operation process of the supercondenser power storage unit were fulfilled with a sharp decrease in the load of a traction electric motor of a direct current electric locomotive. The possibility of RB of the direct current drive with the series motor is substantiated. The equations of the process of charging and discharging of super-condenser storage unit in RB mode are solved. The authors examined the effect of capacitance on the nature of maintaining the excitation current of an electric motor in the mode of small loads.Originality.The paper developed theoretical approaches for the transformation of soft (mechanical and electromechanical characteristics into hard ones of DC series motors. For the first time a new, combined method of the series motor RB is proposed and substantiated. Further development obtained the methods for evaluating the storage unit parameters, taking into account the criteria for reliable parallel operation of super-condensers with an electric motor field. Practical value.The proposed and substantiated transformation of soft characteristics into stiff ones allows us to use general-purpose electric drives with series motors and at low loads, and in traction electric drives - to reduce the intensity of electric stockwheel

  17. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  18. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1: Main text

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  19. The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J.R.; Heo, T.Y.; Cho, B.H. [Korea Electric Power Research Institute, Taejeon (Korea, Republic of); Kang, T.G.; Kim, H.M.; Kim, Y.S.; Oh, S.M.; Kang, Y.S. [Korea Electric Power Data Network Co., Seoul (Korea, Republic of)

    1997-12-31

    Due to aging of the imported seismic monitoring system of Uljin of t 1 and 2 units it is difficult for this system to provide enough functions needed for the security of seismic safety and the evaluation of the earthquake data from the seismic instrumentation. For this reason, it is necessary to replace the seismic monitoring system of Uljin 1 and 2 units with a new system which has the localized and upgraded hardware and corresponding software. In the part of standardization of existing seismic monitoring system, furthermore, it is necessary to develop the seismic wave analysis system which incorporate newly developed software and can real-timely analyze the seismic wave. This report is the finial product of research project ``The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2`` which have been performed from June 1996 to June 1997 by KEPRI and KDN. Main accomplishments - Review of regulatory criteria for seismic monitoring system -Analysis and upgrade of hardware system -Analysis and upgrade of software system - Development of seismic wave analysis system. (author). 17 refs., 49 figs., 6 tabs.

  20. Interprofessional rhetoric and operational realities: an ethnographic study of rounds in four intensive care units.

    Science.gov (United States)

    Paradis, Elise; Leslie, Myles; Gropper, Michael A

    2016-10-01

    Morning interprofessional rounds (MIRs) are used in critical care medicine to improve team-based care and patient outcomes. Given existing evidence of conflict between and dissatisfaction among rounds participants, this study sought to better understand how the operational realities of care delivery in the intensive care unit (ICU) impact the success of MIRs. We conducted a year-long comparative ethnographic study of interprofessional collaboration and patient and family involvement in four ICUs in tertiary academic hospitals in two American cities. The study included 576 h of observation of team interactions, 47 shadowing sessions and 40 clinician interviews. In line with best practices in ethnographic research, data collection and analysis were done iteratively using the constant comparative method. Member check was conducted regularly throughout the project. MIRs were implemented on all units with the explicit goals of improving team-based and patient-centered care. Operational conditions on the units, despite interprofessional commitment and engagement, appeared to thwart ICU teams from achieving these goals. Specifically, time constraints, struggles over space, and conflicts between MIRs' educational and care-plan-development functions all prevented teams from achieving collaboration and patient-involvement. Moreover, physicians' de facto control of rounds often meant that they resembled medical rounds (their historical predecessors), and sidelined other providers' contributions. This study suggests that the MIRs model, as presently practiced, might not be well suited to the provision of team-based, patient-centered care. In the interest of interprofessional collaboration, of the optimization of clinicians' time, of high-quality medical education and of patient-centered care, further research on interprofessional rounds models is needed.

  1. Long-Term Monitoring Network Optimization Evaluation for Operable Unit 2, Bunker Hill Mining and Metallurgical Complex Superfund Site, Idaho

    Science.gov (United States)

    This report presents a description and evaluation of the ground water and surface water monitoring program associated with the Bunker Hill Mining and Metallurgical Complex Superfund Site (Bunker Hill) Operable Unit (OU) 2.

  2. 78 FR 26662 - Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit No. 3 Extension of Public...

    Science.gov (United States)

    2013-05-07

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit No. 3 Extension of Public Comment Period AGENCY: Nuclear Regulatory Commission. ACTION: Draft environmental assessment and finding...

  3. Post-deployment Mental Health in Reserve and National Guard Service Members: Deploying With or Without One's Unit and Deployment Preparedness.

    Science.gov (United States)

    Ursano, Robert J; Wang, Jing; Fullerton, Carol S; Ramsawh, Holly; Gifford, Robert K; Russell, Dale; Cohen, Gregory H; Sampson, Laura; Galea, Sandro

    2018-01-01

    Given the greater prevalence of post-deployment mental health concerns among reservists, the higher likelihood of deploying without their regular unit, and potentially lower rates of deployment preparedness, we examined associations between deploying with or without one's regular unit (individual augmentee status, IAS), deployment preparedness, and mental health problems including post-traumatic stress disorder (PTSD), depression (MDD), and binge drinking in a nationally representative sample of Reserve Component (RC) Army and Marine-enlisted males (n = 705). A series of multivariate regressions examined the association of mental health with IAS and deployment preparedness, adjusting for demographics. To examine whether deployment preparedness varied by IAS, an IAS × deployment preparedness interaction was included. In an adjusted model, being an individual augmentee and low deployment preparedness were associated with any mental health problem (screening positive for PTSD, MDD, binge drinking, or any combination of the three). There was a significant IAS × deployment preparedness interaction. Mental health problems did not vary by preparedness among individual augmentees. Participants deploying with regular units with low-medium preparedness had greater risk for mental health problems (odds ratio [OR] = 3.69, 95% confidence interval [CI] = 1.78-7.62 and OR = 2.29, 95% CI = 1.12-4.71), than those with high preparedness. RC-enlisted male personnel who deployed without their regular unit were five times more likely to have a mental health problem, and were 61% more likely to report binge drinking. Additionally, those with lower levels of deployment preparedness were up to three times more likely to have a mental health problem and up to six times more likely to report PTSD. The current investigation found that both IAS and deployment preparedness were associated with negative mental health outcomes in a large representative sample of previously deployed RC

  4. The United States Nuclear Regulatory Commission's process to evaluate licensee operational safety performance

    International Nuclear Information System (INIS)

    Roe, J.W.

    1989-01-01

    The paper describes the United States Regulatory Commission (NRC)'s process to evaluate licensee operational safety performance. A brief discussion of the transition in safety philosophy between the past predominantly design-construction phase of US nuclear power to the now predominantly operating reactors is included. The unique character of the US nuclear power industry is described to illustrate its licensee performance evaluation challenge. With this introduction, the process of licensee operational safety performance evaluation at the NRC is discussed. The process consists of combining the past Systematic Assessment of Licensee Performance (SALP) programme, newly revised, with a dedicated performance evaluation headquarters group and a series of reviews and evaluations involving various levels of NRC senior managers. The intent of the process is to retain and improve the SALP programme, while strengthening the process by expanding the scope of the evaluation and progressively focusing the attention of NRC senior management on plants of concern. The goal of the process is to anticipate the plants of concern before they can become a threat to the public health and safety. (author)

  5. Continuous operation of NPP Kori Unit 1 - Fireproof paint for cables

    International Nuclear Information System (INIS)

    Wendt, Dipl-Ing. Ruediger; Kim, Duill; Sik, Cho Hong

    2008-01-01

    Fireproof cable coating materials have been used in European NPP, especially in Germany, Russia, Ukraine, Czech Republic, Lithuania, Switzerland. Wide experiences were made during operation while applying these systems. In NPP Kori, Unit 1, a fire proof cable coating project was realised for the first time in a NPP of KHNP. The scope of services of the cable trays to coat amounts to 15,587m 2 . In different fire compartments and rooms the cables should be coated partially respectively completely with the fire proof cable coating system. The extent of cable surfaces to coat was stipulated by KHNP on the basis of an analysis made by KHNP. The project was tendered on the basis of a technical specification of KHNP. The specification is mainly predicted on Korean and US standards. The most important criteria for the fire proof cable coating is resumed as follows: The fireproof cable coating has to assure the fire protection of the cables for a period defined and for operational conditions defined in such a manner that the general conditions for the operation of the cable installation will not be affected

  6. Geophysical Investigation of the 618-10 and 618-11 Burial Grounds, 300-FF-2 Operable Unit

    International Nuclear Information System (INIS)

    Bergstrom, K.A.; Bolin, D.J.; Mitchell, T.H.

    1997-09-01

    This document summarizes the results of geophysical investigations conducted at two radioactive solid waste burial grounds, 618-10 and 618-11. The burial grounds are located approximately 4.5 miles and 7 miles north of the 300 Area, respectively. These sites are within the 300-FF-2 Operable Unit, where geophysical techniques are being used to characterize the distribution of solid waste in the subsurface as part of the Limited Field Investigations for this operable unit

  7. 40 CFR 60.1690 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 60.1690 Section 60.1690 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Model Rule-Good Combustion Practices: Operating Requirements § 60.1690 What...

  8. A Formula for the Units to Satisfy an Operation's Desired Rate of Return in CVP Analysis--A Conceptual Approach

    Science.gov (United States)

    Anderson, Johann A.; Leese, Wallace R.

    2016-01-01

    A common formula presented in many managerial- and cost-accounting textbooks makes possible the determination of the quantity of units which must be produced and sold to generate a desired dollar-amount of operating income. This article addresses the question "What formula can be used to determine the quantity of units needed to yield a…

  9. A manned maneuvering unit proximity operations planning and flight guidance display and control system

    Science.gov (United States)

    Gershzohn, Gary R.; Sirko, Robert J.; Zimmerman, K.; Jones, A. D.

    1990-01-01

    This task concerns the design, development, testing, and evaluation of a new proximity operations planning and flight guidance display and control system for manned space operations. A forecast, derivative manned maneuvering unit (MMU) was identified as a candidate for the application of a color, highway-in-the-sky display format for the presentation of flight guidance information. A silicon graphics 4D/20-based simulation is being developed to design and test display formats and operations concepts. The simulation includes the following: (1) real-time color graphics generation to provide realistic, dynamic flight guidance displays and control characteristics; (2) real-time graphics generation of spacecraft trajectories; (3) MMU flight dynamics and control characteristics; (4) control algorithms for rotational and translational hand controllers; (5) orbital mechanics effects for rendezvous and chase spacecraft; (6) inclusion of appropriate navigation aids; and (7) measurement of subject performance. The flight planning system under development provides for: (1) selection of appropriate operational modes, including minimum cost, optimum cost, minimum time, and specified ETA; (2) automatic calculation of rendezvous trajectories, en route times, and fuel requirements; (3) and provisions for manual override. Man/machine function allocations in planning and en route flight segments are being evaluated. Planning and en route data are presented on one screen composed of two windows: (1) a map display presenting a view perpendicular to the orbital plane, depicting flight planning trajectory and time data attitude display presenting attitude and course data for use en route; and (2) an attitude display presenting local vertical-local horizontal attitude data superimposed on a highway-in-the-sky or flight channel representation of the flight planned course. Both display formats are presented while the MMU is en route. In addition to these displays, several original display

  10. Maintaining reduced noise levels in a resource-constrained neonatal intensive care unit by operant conditioning.

    Science.gov (United States)

    Ramesh, A; Denzil, S B; Linda, R; Josephine, P K; Nagapoornima, M; Suman Rao, P N; Swarna Rekha, A

    2013-03-01

    To evaluate the efficacy of operant conditioning in sustaining reduced noise levels in the neonatal intensive care unit (NICU). Quasi-experimental study on quality of care. Level III NICU of a teaching hospital in south India. 26 staff employed in the NICU. (7 Doctors, 13 Nursing staff and 6 Nursing assistants). Operant conditioning of staff activity for 6 months. This method involves positive and negative reinforcement to condition the staff to modify noise generating activities. Comparing noise levels in decibel: A weighted [dB (A)] before conditioning with levels at 18 and 24 months after conditioning. Decibel: A weighted accounts for noise that is audible to human ears. Operant conditioning for 6 months sustains the reduced noise levels to within 62 dB in ventilator room 95% CI: 60.4 - 62.2 and isolation room (95% CI: 55.8 - 61.5). In the preterm room, noise can be maintained within 52 dB (95% CI: 50.8 - 52.6). This effect is statistically significant in all the rooms at 18 months (P = 0.001). At 24 months post conditioning there is a significant rebound of noise levels by 8.6, 6.7 and 9.9 dB in the ventilator, isolation and preterm room, respectively (P =0.001). Operant conditioning for 6 months was effective in sustaining reduced noise levels. At 18 months post conditioning, the noise levels were maintained within 62 dB (A), 60 dB (A) and 52 dB (A) in the ventilator, isolation and pre-term room, respectively. Conditioning needs to be repeated at 12 months in the ventilator room and at 18 months in the other rooms.

  11. A Survey of the Fuel Cycles Operated in the United Kingdom

    International Nuclear Information System (INIS)

    Allday, C.

    1963-01-01

    (a) The natural uranium/ magnox fuel cycle. The United Kingdom have chosen the natural uranium graphite-moderated gas-cooled reactor as the basis of their nuclear power programme. They have operated the reactors at Calder Hall and Chapelcross for seven years; the Berkeley and Bradwell reactors of the CEGB are now operating, and reactors at seven other sites are under construction or planned. The fuel for these reactors is designed and manufactured at the U.K.A.E.A. Springfields factory and then transported to the reactor site for loading. After irradiation and discharge the fuel is transported to the U.K.A.E.A. site at Windscale for separation of uranium and plutonium from fission products. The paper outlines the UK experience of design and manufacture of fuel, re actor operation, transport of irradiated fuel and subsequent processing of the fuel. Mention is made of the behaviour of fuel in a reactor and alternative charging and discharging programmes, the subject is further elaborated in another paper. (b) Reactors using enriched fuels. The UK are developing an advanced gas-cooled reactor (AGR), the prototype reactor of which came on power in 1963. The fuel is manufactured from enriched uranium oxide canned in stainless steel and it will be reprocessed through a ''head-end'' which will be added to the Windscale Magnox separation plant. The enriched uranium for the AGR is produced in the UK Diffusion Plant at Capenhurst. An alternative to enriched uranium oxide as a fuel is plutonium-enriched natural-uranium oxide. The paper outlines the experience in production of oxide fuel for AGR, the operating experience with the reactor so far and the plans for reprocessing the fuel. The alternative use of a plutonium fuel is considered and the effects of this on costs and the fuel cycle. Finally the paper outlines the place of Magnox and AGR reactors in the UK power programme. (author) [fr

  12. Annual Summary Report, February to December 1998, for the 100-HR-3 and 100-KR-4 Pump-and-Treat Operations and Operable Units

    International Nuclear Information System (INIS)

    Boutin, R. J.

    1999-01-01

    This annual summary report discusses the interim remedial actions at the 100-HR-3 and 100-KR-4 Operable Units (OUs) for February 1,1998, through December 31, 1998. This is the second annual summary report that has been submitted for these OUs; the first report was released in April 1998 (DOE-RL 1998). Ongoing annual summaries and performance evaluations of each of the pump-and-treat systems are required by the Remedial Design Report and Remedial Action Work Plan for the 100-HR-3 and 100-KR-4 Groundwater Operable Units' Interim Action (RDR/RAWP) (DOE-RL 1996)

  13. Geophysical investigation of the 116-H-1 liquid waste disposal trench, 100-HR-1 operable unit

    International Nuclear Information System (INIS)

    Bergstrom, K.A.; Mitchell, T.H.

    1996-04-01

    A geophysical investigation and data integration were conducted for the 116-H-1 Liquid Waste Disposal Trench, which is located in the 100-HR-1 Operable Unit. The 116-H-1 Liquid Waste Disposal Trench is also known as the 107-H Liquid Waste Disposal Trench, the 107-H Rupture Effluent Trench, and the 107-H Trench (Deford and Einan 1995). The trench was primarily used to hold effluent from the 107-H Retention Basin that had become radioactive from contact with ruptured fuel elements. The effluent may include debris from the ruptured fuel elements (Koop 1964). The 116-H-1 Liquid Waste Disposal Trench was also used to hold water and sludge from the 107-H Retention Basin during the basin's deactivation in 1965

  14. Clinical microbiology in the intensive care unit: Strategic and operational characteristics

    Directory of Open Access Journals (Sweden)

    Bhattacharya S

    2010-01-01

    Full Text Available Infection is a major cause of morbidity and mortality among patients admitted in intensive care units (ICUs. The application of the principles and the practice of Clinical Microbiology for ICU patients can significantly improve clinical outcome. The present article is aimed at summarising the strategic and operational characteristics of this unique field where medical microbiology attempts to venture into the domain of direct clinical care of critically ill patients. The close and strategic partnership between clinical microbiologists and intensive care specialists, which is essential for this model of patient care have been emphasized. The article includes discussions on a variety of common clinical-microbiological problems faced in the ICUs such as ventilator-associated pneumonia, blood stream infections, skin and soft tissue infection, UTI, infection control, besides antibiotic management.

  15. Eielson Air Force Base operable unit 2 and other areas record of decision

    International Nuclear Information System (INIS)

    Lewis, R.E.; Smith, R.M.

    1994-10-01

    This decision document presents the selected remedial actions and no action decisions for Operable Unit 2 (OU2) at Eielson Air Force Base (AFB), Alaska, chosen in accordance with state and federal regulations. This document also presents the decision that no further action is required for 21 other source areas at Eielson AFB. This decision is based on the administrative record file for this site. OU2 addresses sites contaminated by leaks and spills of fuels. Soils contaminated with petroleum products occur at or near the source of contamination. Contaminated subsurface soil and groundwater occur in plumes on the top of a shallow groundwater table that fluctuates seasonally. These sites pose a risk to human health and the environment because of ingestion, inhalation, and dermal contact with contaminated groundwater. The purpose of this response is to prevent current or future exposure to the contaminated groundwater, to reduce further contaminant migration into the groundwater, and to remediate groundwater

  16. Evaluation of the operational efficiency of pacifying police units in the state of Rio de Janeiro

    Directory of Open Access Journals (Sweden)

    Igor Rosa Dias de Jesus

    2014-05-01

    Full Text Available The Pacification Police Unit (UPP is a new model for public security and policing, aimed at ensuring local security and, above all, reduce, or even, extinguish violent crime linked to drug trafficking, and approach people and police. The purpose of this article is measuring the operational efficiency of all UPPs installed in the state of Rio de Janeiro by the beginning of 2011 by Data Envelopment Analysis (DEA. For this, it was used the CCR model – input-oriented – developed by Charnes, Cooper and Rhodes, which allows an objective assessment of the overall efficiency, identifying the sources of inefficiencies and the needed targets to achieve the efficiency in each UPP. The results converge to a reduction of the amount of policemen in all communities out of the efficiency frontier.

  17. 300-FF-1 operable unit remedial investigation phase II report: Physical separation of soils treatability study

    International Nuclear Information System (INIS)

    1994-04-01

    This report describes the approach and results of physical separations treatability tests conducted at the Hanford Site in the North Process Pond of the 300-FF-1 Operable Unit. Physical separation of soils was identified as a remediation alternative due to the potential to significantly reduce the amount of contaminated soils prior to disposal. Tests were conducted using a system developed at Hanford consisting of modified EPA equipment integrated with screens, hoppers, conveyors, tanks, and pumps from the Hanford Site. The treatability tests discussed in this report consisted of four parts, in which an estimated 84 tons of soil was processed: (1) a pre-test run to set up the system and adjust system parameters for soils to be processed; (2) a baseline run to establish the performance of the system - Test No. 1; (3) a final run in which the system was modified as a result of findings from the baseline run - Test No. 2; and (4) water treatment

  18. 300-FF-1 operable unit remedial investigation phase II report: Physical separation of soils treatability study

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This report describes the approach and results of physical separations treatability tests conducted at the Hanford Site in the North Process Pond of the 300-FF-1 Operable Unit. Physical separation of soils was identified as a remediation alternative due to the potential to significantly reduce the amount of contaminated soils prior to disposal. Tests were conducted using a system developed at Hanford consisting of modified EPA equipment integrated with screens, hoppers, conveyors, tanks, and pumps from the Hanford Site. The treatability tests discussed in this report consisted of four parts, in which an estimated 84 tons of soil was processed: (1) a pre-test run to set up the system and adjust system parameters for soils to be processed; (2) a baseline run to establish the performance of the system - Test No. 1; (3) a final run in which the system was modified as a result of findings from the baseline run - Test No. 2; and (4) water treatment.

  19. Development and Evaluation of the Habitat Demonstration Unit Medical Operations Workstation and Opportunities for Future Research

    Science.gov (United States)

    Howard, Robert L., Jr.

    2012-01-01

    As NASA develops missions to leave Earth orbit and explore distant destinations (Mars, Moon, Asteroids) it is necessary to rethink human spaceflight paradigms in the life sciences. Standards developed for low earth orbit human spaceflight may not be fully applicable and in-space research may be required to develop new standards. Preventative and emergency medical care may require new capabilities never before used in space. Due to spacecraft volume limitations, this work area may also be shared with various animal and plant life science research. This paper explores the prototype Medical Operations Workstation within the NASA Habitat Demonstration Unit and discusses some of the lessons learned from field analogue missions involving the workstation. Keywords: Exploration, medical, health, crew, injury emergency, biology, animal, plant, science, preventative, emergency.

  20. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    International Nuclear Information System (INIS)

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided

  1. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  2. Technical challenges in the qualitative ecological risk assessments performed on the Hanford Site operable units

    International Nuclear Information System (INIS)

    Probasco, K.M.

    1994-01-01

    Qualitative Risk Assessments (QRAS) have been selected as the method for providing the risk-driver indications for interim, remedial, and cleanup actions for the Hanford Site operable units' ecological risk assessments. This expedited response action path has been developed for the Hanford Site to facilitate time-critical decisions and generate immediate emergency cleanup actions. Tight budgets and aggressive time schedules are a major factor in the development of the QRA process. The QRA is a quick way to find immediate threats and a good precursor to a full risk assessment. However, numerous technical challenges have been identified with the QRA approach. The QRA approach differs from a baseline risk assessment in several ways. The main differences involve the use of data that have previously been gathered from the site, and the development of a ''bias-for-action'' document that would reveal qualitative risks from the contaminants identified at the operable units. Technical challenges concerning the ecological portion of these QRAs have raised questions about using the ORA for decision-making and may have weakened the validity of its use in the established procedural framework. Challenges involving such issues as the extrapolation of the contaminant data, data validation and screening techniques, receptor selections, and the final risk characterization outcome threaten the feasibility of the QRA as a decision-making tool. This discussion provides insight into resolving technical challenges and may be a ''lessons-learned'' device for those interested in the QRA approach. Ultimately, these challenges are proving to be learning tools for scientists, regulators, and ecologists and are identifying the data gaps and research direction for future ecological baseline risk assessments

  3. Simulation of operational processes in hospital emergency units as lean healthcare tool

    Directory of Open Access Journals (Sweden)

    Andreia Macedo Gomes

    2017-07-01

    Full Text Available Recently, the Lean philosophy is gaining importance due to a competitive environment, which increases the need to reduce costs. Lean practices and tools have been applied to manufacturing, services, supply chain, startups and, the next frontier is healthcare. Most lean techniques can be easily adapted to health organizations. Therefore, this paper intends to summarize Lean practices and tools that are already being applied in health organizations. Among the numerous techniques and lean tools used, this research highlights the Simulation. Therefore, in order to understand the use of Simulation as a Lean Healthcare tool, this research aims to analyze, through the simulation technique, the operational dynamics of the service process of a fictitious hospital emergency unit. Initially a systematic review of the literature on the practices and tools of Lean Healthcare was carried out, in order to identify the main techniques practiced. The research highlighted Simulation as the sixth most cited tool in the literature. Subsequently, a simulation of a service model of an emergency unit was performed through the Arena software. As a main result, it can be highlighted that the attendants of the built model presented a degree of idleness, thus, they are able to atend a greater demand. As a last conclusion, it was verified that the emergency room is the process with longer service time and greater overload.

  4. Emergy Evaluation of Dwelling Operation in Five Housing Units of Montreal Island, Canada

    Directory of Open Access Journals (Sweden)

    Ricardo Enrique Vega-Azamar

    2017-04-01

    Full Text Available Sustainability of cities and the environmental implications of high resource utilization by the domestic sector are growing concerns related to urban regions. Well-informed urban planning decision-making is an essential tool to help in the task and, for that, an important point to consider is the influence of parameters like residential density and housing typology on the intensity of resource utilization. Emergy synthesis, a life-cycle energy analysis methodological approach that considers the interaction of natural and human-made flows, was used to evaluate the environmental support for dwelling operational stage in five typical present-day housing units on the island of Montreal. As expected, resource utilization, measured as total emergy used, was positively correlated to housing unit size both with respect to number of occupants and dwelling size. Results suggest that variables affecting notably the intensity of resource utilization are per household income and per dweller habitable space and, while a higher income increased per capita emergy in all cases, increasing space availability per resident did not result in a decrease of empower density after 50 m2/person. Future work should consider lower and higher densities and analyses at the scale of blocks, neighborhoods and urban planning zones.

  5. Model for Sucker-Rod Pumping Unit Operating Modes Analysis Based on SimMechanics Library

    Science.gov (United States)

    Zyuzev, A. M.; Bubnov, M. V.

    2018-01-01

    The article provides basic information about the process of a sucker-rod pumping unit (SRPU) model developing by means of SimMechanics library in the MATLAB Simulink environment. The model is designed for the development of a pump productivity optimal management algorithms, sensorless diagnostics of the plunger pump and pumpjack, acquisition of the dynamometer card and determination of a dynamic fluid level in the well, normalization of the faulty unit operation before troubleshooting is performed by staff as well as equilibrium ratio determining by energy indicators and outputting of manual balancing recommendations to achieve optimal power consumption efficiency. Particular attention is given to the application of various blocks from SimMechanics library to take into account the pumpjack construction principal characteristic and to obtain an adequate model. The article explains in depth the developed tools features for collecting and analysis of simulated mechanism data. The conclusions were drawn about practical implementation possibility of the SRPU modelling results and areas for further development of investigation.

  6. Limited field investigation report for the 100-HR-1 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-HR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA) (WHC 1993a), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. A LFI Report is required, in accordance with the HPPS, when waste sites are to be considered for IRMs. The LFI is an integral part of the remedial investigation/feasibility study (RI/FS) or Resource Conservation and Recovery Act (RCRA) facility investigation/corrective measures study (RFI/CMS) and process and functions as a focused RI or RFI for selection of IRMs. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRMs, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify contaminant- and location-specific applicable or relevant and appropriate requirements (ARA), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose an unacceptable risk that warrants action through IRMs. The 100-HR-1 unit encompasses approximately 100 acres adjacent to the Columbia River shoreline. It contains waste units associated with the original plant facilities constructed to support the H Reactor. The area also contains evaporation basins which received liquid process wastes and nonroutine deposits of chemical wastes from the 300 Area, where fuel elements for the N Reactor were produced.

  7. Limited field investigation report for the 100-HR-1 Operable Unit

    International Nuclear Information System (INIS)

    1994-08-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-HR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA) (WHC 1993a), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. A LFI Report is required, in accordance with the HPPS, when waste sites are to be considered for IRMs. The LFI is an integral part of the remedial investigation/feasibility study (RI/FS) or Resource Conservation and Recovery Act (RCRA) facility investigation/corrective measures study (RFI/CMS) and process and functions as a focused RI or RFI for selection of IRMs. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRMs, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify contaminant- and location-specific applicable or relevant and appropriate requirements (ARA), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose an unacceptable risk that warrants action through IRMs. The 100-HR-1 unit encompasses approximately 100 acres adjacent to the Columbia River shoreline. It contains waste units associated with the original plant facilities constructed to support the H Reactor. The area also contains evaporation basins which received liquid process wastes and nonroutine deposits of chemical wastes from the 300 Area, where fuel elements for the N Reactor were produced

  8. Enhancing the ecological and operational characteristics of water treatment units at TPPs based on baromembrane technologies

    Science.gov (United States)

    Chichirova, N. D.; Chichirov, A. A.; Filimonova, A. A.; Saitov, S. R.

    2017-12-01

    The innovative baromembrane technologies for water demineralization were introduced at Russian TPPs more than 25 years ago. While being used in the power engineering industry of Russia, these technologies demonstrated certain advantages over the traditional ion-exchange and thermal technologies of makeup water treatment for steam boilers. Water treatment units based on the baromembrane technology are compact, easy to operate, and highly automated. The experience gained from the use of these units shows that their reliability depends directly on preliminary water treatment. The popular water pretreatment technology with coagulation by aluminum oxychloride proved to be inefficient during the seasonal changes of source water quality that occurs at some stations. The use of aluminum coagulant at pH 8 and higher does not ensure the stable and qualitative pretreatment regime: soluble aluminum forms slip on membranes of the ultrafiltration unit, thereby causing pollution and intoxication as well as leading to structural damages or worsening of mechanical properties of the membranes. The problem of increased pH and seasonal changes of the source water quality can be solved by substitution of the traditional coagulant into a new one. To find the most successful coagulant for water pretreatment, experiments have been performed on both qualitative and quantitative analysis of the content of natural organic matters in the Volga water and their structure. We have developed a software program and measured the concentrations of soluble aluminum and iron salts at different pH values of the source water. The analysis of the obtained results has indicated that iron sulfate at pH 6.0-10.2, in contrast to aluminum oxychloride, is not characterized by increased solubility. Thus, the basic process diagrams of water pretreatment based on baromembrane technologies with pretreatment through coagulation by iron salts and wastewater amount reducing from 60-40 to 5-2% have been introduced for

  9. The United Nations Standing Force a Qualitative Analysis of Strategic and Operational Options for the United States

    Science.gov (United States)

    1993-06-01

    Approved by: Fa t search Acvisor Dagil-- 7 • serch Ad Executive Summary of THE UNITED NATIONS STANDING FORCE The Secretary General of the United Nations has...should the United States participa’e? 5. Could the U.S. still protect/pursue its national interests? 6. How would the U.S. participate? 7. What might the...Cyprus since 1964.2k We can only wonder if the proposal by the S3ecretary General for the family of nations to exercise py ventive 8 I measures, given

  10. Microalgae cultivation as tertiary unit operation for treatment of pharmaceutical wastewater associated with lipid production.

    Science.gov (United States)

    Hemalatha, Manupati; Venkata Mohan, S

    2016-09-01

    Microalgae based treatment was studied to polish sequential batch reactor (SBR) treated pharmaceutical wastewater under mixotrophic mode of operation with simultaneous biomass/lipid production. At the end of biomass growth phase (BGP), carbon removal efficiency was observed to be 73% along with good removal of nitrates (62%). Since microalgae assimilate nutrients from wastewater for growth, an increment in total biomass productivity (2.8g/l) was observed. Subjecting to nutrient stress phase (NSP), total lipid content of 17.2% with neutral lipids of 6.2% was observed under light condition. Contrarily, dark condition depicted total lipid content of 15.8% with neutral lipids constituting 6.5%. The nutrient stress in combination with light showed marked influence on the profile of saturated and unsaturated fatty acids. Integration of microalgae cultivation improves environmental sustainability and enables greener routes of biofuels and value added products synthesis in a biorefinery approach. Copyright © 2016 Elsevier Ltd. All rights reserved.

  11. Two-Dimensional Simulation of Mass Transfer in Unitized Regenerative Fuel Cells under Operation Mode Switching

    Directory of Open Access Journals (Sweden)

    Lulu Wang

    2016-01-01

    Full Text Available A two-dimensional, single-phase, isothermal, multicomponent, transient model is built to investigate the transport phenomena in unitized regenerative fuel cells (URFCs under the condition of switching from the fuel cell (FC mode to the water electrolysis (WE mode. The model is coupled with an electrochemical reaction. The proton exchange membrane (PEM is selected as the solid electrolyte of the URFC. The work is motivated by the need to elucidate the complex mass transfer and electrochemical process under operation mode switching in order to improve the performance of PEM URFC. A set of governing equations, including conservation of mass, momentum, species, and charge, are considered. These equations are solved by the finite element method. The simulation results indicate the distributions of hydrogen, oxygen, water mass fraction, and electrolyte potential response to the transient phenomena via saltation under operation mode switching. The hydrogen mass fraction gradients are smaller than the oxygen mass fraction gradients. The average mass fractions of the reactants (oxygen and hydrogen and product (water exhibit evident differences between each layer in the steady state of the FC mode. By contrast, the average mass fractions of the reactant (water and products (oxygen and hydrogen exhibit only slight differences between each layer in the steady state of the WE mode. Under either the FC mode or the WE mode, the duration of the transient state is only approximately 0.2 s.

  12. Operable Unit 1 remedial investigation report, Eielson Air Force Base, Alaska

    International Nuclear Information System (INIS)

    Gilmore, T.J.; Fruland, R.M.; Liikala, T.L.

    1994-06-01

    This remedial investigation report for operable Unit 1 (OU-1) at Eielson Air Force Base presents data, calculations, and conclusions as to the nature and extent of surface and subsurface contamination at the eight source areas that make up OU-1. The information is based on the 1993 field investigation result and previous investigations. This report is the first in a set of three for OU-1. The other reports are the baseline risk assessment and feasibility study. The information in these reports will lead to a Record of Decision that will guide and conclude the environmental restoration effort for OU-1 at Eielson Air Force Base. The primary contaminants of concern include fuels and fuel-related contaminants (diesel; benzene, toluene, ethylbenzene, and xylene; total petroleum hydrocarbon; polycyclic aromatic hydrocarbons), maintenance-related solvents and cleaners (volatile chlorinated hydrocarbons such as trichloroothylene), polychlorinated biphenyls, and dichlorodiphenyltrichloroethane (DDT). The origins of contaminants of concern include leaks from storage tanks, drums and piping, and spills. Ongoing operations and past sitewide practices also contribute to contaminants of concern at OU-1 source areas. These include spraying mixed oil and solvent wastes on unpaved roads and aerial spraying of DDT

  13. Operable Unit 1 remedial investigation report, Eielson Air Force Base, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Gilmore, T.J.; Fruland, R.M.; Liikala, T.L. [and others

    1994-06-01

    This remedial investigation report for operable Unit 1 (OU-1) at Eielson Air Force Base presents data, calculations, and conclusions as to the nature and extent of surface and subsurface contamination at the eight source areas that make up OU-1. The information is based on the 1993 field investigation result and previous investigations. This report is the first in a set of three for OU-1. The other reports are the baseline risk assessment and feasibility study. The information in these reports will lead to a Record of Decision that will guide and conclude the environmental restoration effort for OU-1 at Eielson Air Force Base. The primary contaminants of concern include fuels and fuel-related contaminants (diesel; benzene, toluene, ethylbenzene, and xylene; total petroleum hydrocarbon; polycyclic aromatic hydrocarbons), maintenance-related solvents and cleaners (volatile chlorinated hydrocarbons such as trichloroothylene), polychlorinated biphenyls, and dichlorodiphenyltrichloroethane (DDT). The origins of contaminants of concern include leaks from storage tanks, drums and piping, and spills. Ongoing operations and past sitewide practices also contribute to contaminants of concern at OU-1 source areas. These include spraying mixed oil and solvent wastes on unpaved roads and aerial spraying of DDT.

  14. 100-OL-1 Operable Unit Pilot Study: XRF Evaluation of Select Pre-Hanford Orchards

    Energy Technology Data Exchange (ETDEWEB)

    Bunn, Amoret L.; Fritz, Brad G.; Pulsipher, Brent A.; Gorton, Alicia M.; Bisping, Lynn E.; Brandenberger, Jill M.; Pino, Christian; Martinez, Dominique M.; Rana, Komal; Wellman, Dawn M.

    2014-11-20

    Prior to the acquisition of land by the U.S. Department of War in February 1943 and the creation of the Hanford Site, the land along the Columbia River was home to over 1000 people. Farming and orchard operations by both homesteaders and commercial organizations were prevalent. Orchard activities and the associated application of lead arsenate pesticide ceased in 1943, when residents were moved from the Hanford Site at the beginning of the Manhattan Project. Today, the residues from historical application of lead arsenate pesticide persist in some locations on the Hanford Site. In 2012, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology established the 100-OL-1 Operable Unit (OU) through the Hanford Federal Facility Agreement and Consent Order, known as the Tri-Party Agreement. The pre-Hanford orchard lands identified as the 100-OL-1 OU are located south of the Columbia River and east of the present-day Vernita Bridge, and extend southeast to the former Hanford townsite. The discontinuous orchard lands within 100-OL-1 OU are approximately 20 km2 (5000 ac). A pilot study was conducted to support the approval of the remedial investigation/feasibility study work plan to evaluate the 100-OL-1 OU. This pilot study evaluated the use of a field portable X-ray fluorescence (XRF) analyzer for evaluating lead and arsenic concentrations on the soil surface as an indicator of lead arsenate pesticide residues in the OU. The objectives of the pilot study included evaluating a field portable XRF analyzer as the analytical method for decision making, estimating the nature and extent of lead and arsenic in surface soils in four decision units, evaluating the results for the purpose of optimizing the sampling approach implemented in the remedial investigation, and collecting information to improve the cost estimate and planning the cultural resources review for sampling activities in the remedial investigation. Based on

  15. Molten salt coal gasification process development unit. Phase 1. Volume 1. PDU operations. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kohl, A.L.

    1980-05-01

    This report summarizes the results of a test program conducted on the Molten Salt Coal Gasification Process, which included the design, construction, and operation of a Process Development Unit. In this process, coal is gasified by contacting it with air in a turbulent pool of molten sodium carbonate. Sulfur and ash are retained in the melt, and a small stream is continuously removed from the gasifier for regeneration of sodium carbonate, removal of sulfur, and disposal of the ash. The process can handle a wide variety of feed materials, including highly caking coals, and produces a gas relatively free from tars and other impurities. The gasification step is carried out at approximately 1800/sup 0/F. The PDU was designed to process 1 ton per hour of coal at pressures up to 20 atm. It is a completely integrated facility including systems for feeding solids to the gasifier, regenerating sodium carbonate for reuse, and removing sulfur and ash in forms suitable for disposal. Five extended test runs were made. The observed product gas composition was quite close to that predicted on the basis of earlier small-scale tests and thermodynamic considerations. All plant systems were operated in an integrated manner during one of the runs. The principal problem encountered during the five test runs was maintaining a continuous flow of melt from the gasifier to the quench tank. Test data and discussions regarding plant equipment and process performance are presented. The program also included a commercial plant study which showed the process to be attractive for use in a combined-cycle, electric power plant. The report is presented in two volumes, Volume 1, PDU Operations, and Volume 2, Commercial Plant Study.

  16. Typhoid perforation: Post-operative Intensive Care Unit care and outcome

    Directory of Open Access Journals (Sweden)

    Mukaila Oyegbade Akinwale

    2016-01-01

    Full Text Available Background: Typhoid perforation ileitis is a serious complication of typhoid fever, a common and unfortunate health problem in a resource-poor country like Nigeria. Following bowel perforation, treatment is usually by simple closure or bowel resection and anastomosis after adequate aggressive fluid resuscitation and electrolyte correction. Postoperatively, some of these patients do require management in Intensive Care Unit (ICU on account of sepsis or septic shock and to improve survival. Patients and Methods: This is a prospective observational study in which 67 consecutive patients who had exploratory laparotomy for typhoid perforation between August 2009 and October 2012 in the main operating theatre of the University College Hospital, Ibadan, were studied. The attending anaesthetists had the freedom of choosing the appropriate anaesthetic drugs depending on the patients' clinical condition. The reason for admission into the ICU, the types of organ support required and outcomes were recorded. Results: Twenty-five patients (37.3% out of 67 required critical care. Reasons for admission among others included poor respiratory effort, hypotension, septic shock and delayed recovery from anaesthesia. Twenty-one patients (84% required mechanical ventilation with a mean duration of 2.14 days (range 1–5 days. Fourteen patients required ionotropic support and the length of ICU stay ranged from 1 to 15 days (mean 4.32 days. Nineteen patients (76% were successfully managed and discharged to the ward while 24% (6 patients mortality rate was recorded. Conclusion: This study showed high rate of post-operative ICU admission in patients with typhoid perforation with a high demand for critical care involving mechanical ventilation and ionotropic support. In centres that manage patients presenting with typhoid ileitis and perforation, post-operative critical care should be available.

  17. Monticello Mill Tailings Site, Operable Unit lll, Annual Groundwater Report, May 2015 Through April 2016

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Jason [USDOE Office of Legacy Management (LM), Washington, DC (United States); Smith, Fred [Navarro Research and Engineering, Oak Ridge, TN (United States)

    2016-10-01

    This report provides the annual analysis of water quality restoration progress, cumulative through April 2016, for Operable Unit (OU) III, surface water and groundwater, of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Monticello Mill Tailings Site (MMTS). The MMTS is a Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List site located in and near the city of Monticello, San Juan County, Utah. MMTS comprises the 110-acre site of a former uranium- and vanadium-ore-processing mill (mill site) and 1700 acres of surrounding private and municipal property. Milling operations generated 2.5 million cubic yards of waste (tailings) from 1942 to 1960. The tailings were impounded at four locations on the mill site. Inorganic constituents in the tailings drained from the impoundments to contaminate local surface water (Montezuma Creek) and groundwater in the underlying alluvial aquifer. Mill tailings dispersed by wind and water also contaminated properties surrounding and downstream of the mill site. Remedial actions to remove and isolate radiologically contaminated soil, sediment, and debris from the former mill site, Operable Unit I (OU I), and surrounding properties (OU II) were completed in 1999 with the encapsulation of the wastes in an engineered repository located on DOE property 1 mile south of the former mill site. This effectively removed the primary source of groundwater contamination; however, contamination of groundwater and surface water remains within OU III at levels that exceed water quality protection standards. Uranium is the primary contaminant of concern (COC). LM implemented monitored natural attenuation with institutional controls as the OU III remedy in 2004. Because groundwater restoration proceeded more slowly than expected and did not meet performance criteria established in the OU III Record of Decision (June 2004), LM implemented a contingency action in 2009 by an Explanation of

  18. Impact of Selection of Cord Blood Units from the United States and Swiss Registries on the Cost of Banking Operations

    Science.gov (United States)

    Bart, Thomas; Boo, Michael; Balabanova, Snejana; Fischer, Yvonne; Nicoloso, Grazia; Foeken, Lydia; Oudshoorn, Machteld; Passweg, Jakob; Tichelli, Andre; Kindler, Vincent; Kurtzberg, Joanne; Price, Thomas; Regan, Donna; Shpall, Elizabeth J.; Schwabe, Rudolf

    2013-01-01

    Background Over the last 2 decades, cord blood (CB) has become an important source of blood stem cells. Clinical experience has shown that CB is a viable source for blood stem cells in the field of unrelated hematopoietic blood stem cell transplantation. Methods Studies of CB units (CBUs) stored and ordered from the US (National Marrow Donor Program (NMDP) and Swiss (Swiss Blood Stem Cells (SBSQ)) CB registries were conducted to assess whether these CBUs met the needs of transplantation patients, as evidenced by units being selected for transplantation. These data were compared to international banking and selection data (Bone Marrow Donors Worldwide (BMDW), World Marrow Donor Association (WMDA)). Further analysis was conducted on whether current CB banking practices were economically viable given the units being selected from the registries for transplant. It should be mentioned that our analysis focused on usage, deliberately omitting any information about clinical outcomes of CB transplantation. Results A disproportionate number of units with high total nucleated cell (TNC) counts are selected, compared to the distribution of units by TNC available. Therefore, the decision to use a low threshold for banking purposes cannot be supported by economic analysis and may limit the economic viability of future public CB banking. Conclusions We suggest significantly raising the TNC level used to determine a bankable unit. A level of 125 × 107 TNCs, maybe even 150 × 107 TNCs, might be a viable banking threshold. This would improve the return on inventory investments while meeting transplantation needs based on current selection criteria. PMID:23637645

  19. Impact of selection of cord blood units from the United States and swiss registries on the cost of banking operations.

    Science.gov (United States)

    Bart, Thomas; Boo, Michael; Balabanova, Snejana; Fischer, Yvonne; Nicoloso, Grazia; Foeken, Lydia; Oudshoorn, Machteld; Passweg, Jakob; Tichelli, Andre; Kindler, Vincent; Kurtzberg, Joanne; Price, Thomas; Regan, Donna; Shpall, Elizabeth J; Schwabe, Rudolf

    2013-02-01

    Over the last 2 decades, cord blood (CB) has become an important source of blood stem cells. Clinical experience has shown that CB is a viable source for blood stem cells in the field of unrelated hematopoietic blood stem cell transplantation. Studies of CB units (CBUs) stored and ordered from the US (National Marrow Donor Program (NMDP) and Swiss (Swiss Blood Stem Cells (SBSQ)) CB registries were conducted to assess whether these CBUs met the needs of transplantation patients, as evidenced by units being selected for transplantation. These data were compared to international banking and selection data (Bone Marrow Donors Worldwide (BMDW), World Marrow Donor Association (WMDA)). Further analysis was conducted on whether current CB banking practices were economically viable given the units being selected from the registries for transplant. It should be mentioned that our analysis focused on usage, deliberately omitting any information about clinical outcomes of CB transplantation. A disproportionate number of units with high total nucleated cell (TNC) counts are selected, compared to the distribution of units by TNC available. Therefore, the decision to use a low threshold for banking purposes cannot be supported by economic analysis and may limit the economic viability of future public CB banking. We suggest significantly raising the TNC level used to determine a bankable unit. A level of 125 × 10(7) TNCs, maybe even 150 × 10(7) TNCs, might be a viable banking threshold. This would improve the return on inventory investments while meeting transplantation needs based on current selection criteria.

  20. FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    BYRNES ME

    2008-07-18

    The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986

  1. Operations of electric taxis to serve advance reservations by trip chaining: Sensitivity analysis on network size, customer demand and number of charging stations

    Directory of Open Access Journals (Sweden)

    Hao Wang

    2016-10-01

    Full Text Available This research investigated the performance of an Electric Taxi (ET fleet that catered solely for customers with advance reservations. In a previously related research, a customized Paired Pickup and Delivery Problem with Time Window and Charging Station (PPDPTWCS had been formulated to solve for the minimum number of taxis that would serve a fixed set of customer demand. The concept behind this fleet optimization was to chain multiple customer trips and trips to Charging Stations (CSs to form a route and assigned to a taxi driver. In this paper the sensitivity of the ET fleet’s operations with respect to network sizes, customer demand densities and number of CSs have been investigated. It also analyzed the market shares of the CSs and the occupancy of a CS over time. The results showed that, (1 the expansion of network size or the increase in customer demand density led to increase in fleet size, number of trips to the CSs and maximum occupancies at the CSs but these performance measures grew at different rates; (2 when the network size and number of CSs were fixed, an increase in customer demand density led to a better utilization of taxis in terms of more customers served per taxi and higher average revenue per taxi; (3 given the same network size and demand density, the ET fleet’s performance was relatively insensitive to the number of CSs; and (4 the usage of individual CS was affected by the number of CS and their locations; and (5 when all the ETs were fully charged at the beginning of the same shift hour, they visited the CSs in bunches when their batteries were about to run out. These findings contribute to a better understanding of the operations of the ET fleet and the CSs. They could be used for making better decisions in the planning of ET operations.

  2. Overview of PAT process analysers applicable in monitoring of film coating unit operations for manufacturing of solid oral dosage forms.

    Science.gov (United States)

    Korasa, Klemen; Vrečer, Franc

    2018-01-01

    Over the last two decades, regulatory agencies have demanded better understanding of pharmaceutical products and processes by implementing new technological approaches, such as process analytical technology (PAT). Process analysers present a key PAT tool, which enables effective process monitoring, and thus improved process control of medicinal product manufacturing. Process analysers applicable in pharmaceutical coating unit operations are comprehensibly described in the present article. The review is focused on monitoring of solid oral dosage forms during film coating in two most commonly used coating systems, i.e. pan and fluid bed coaters. Brief theoretical background and critical overview of process analysers used for real-time or near real-time (in-, on-, at- line) monitoring of critical quality attributes of film coated dosage forms are presented. Besides well recognized spectroscopic methods (NIR and Raman spectroscopy), other techniques, which have made a significant breakthrough in recent years, are discussed (terahertz pulsed imaging (TPI), chord length distribution (CLD) analysis, and image analysis). Last part of the review is dedicated to novel techniques with high potential to become valuable PAT tools in the future (optical coherence tomography (OCT), acoustic emission (AE), microwave resonance (MR), and laser induced breakdown spectroscopy (LIBS)). Copyright © 2017 Elsevier B.V. All rights reserved.

  3. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    On December 21, 1989, the EPA placed the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) on the National Priorities List (NPL). On January 1, 1992, a Federal Facilities Agreement (FFA) between the DOE Field Office in Oak Ridge (DOE-OR), EPA Region IV, and the Tennessee Department of Environment and Conservation (TDEC) went into effect. This FFA establishes the procedural framework and schedule by which DOE-OR will develop, coordinate, implement and monitor environmental restoration activities on the ORR in accordance with applicable federal and state environmental regulations. The DOE-OR Environmental Restoration Program for the ORR addresses the remediation of areas both within and outside the ORR boundaries. This sampling and analysis plan focuses on confirming the cleanup of the stretch of EFPC flowing from Lake Reality at the Y-12 Plant through the City of Oak Ridge, to Poplar Creek on the ORR and its associated floodplain. Both EFPC and its floodplain have been contaminated by releases from the Y-12 Plant since the mid-1950s. Because the EFPC site-designated as an ORR operable unit (OU) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is included on the NPL, its remediation must follow the specific procedures mandated by CERCLA, as amended by the Superfund Amendments and Reauthorization Act in 1986

  4. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    On December 21, 1989, the EPA placed the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) on the National Priorities List (NPL). On January 1, 1992, a Federal Facilities Agreement (FFA) between the DOE Field Office in Oak Ridge (DOE-OR), EPA Region IV, and the Tennessee Department of Environment and Conservation (TDEC) went into effect. This FFA establishes the procedural framework and schedule by which DOE-OR will develop, coordinate, implement and monitor environmental restoration activities on the ORR in accordance with applicable federal and state environmental regulations. The DOE-OR Environmental Restoration Program for the ORR addresses the remediation of areas both within and outside the ORR boundaries. This sampling and analysis plan focuses on confirming the cleanup of the stretch of EFPC flowing from Lake Reality at the Y-12 Plant through the City of Oak Ridge, to Poplar Creek on the ORR and its associated floodplain. Both EFPC and its floodplain have been contaminated by releases from the Y-12 Plant since the mid-1950s. Because the EFPC site-designated as an ORR operable unit (OU) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is included on the NPL, its remediation must follow the specific procedures mandated by CERCLA, as amended by the Superfund Amendments and Reauthorization Act in 1986.

  5. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Abdollahi

    2015-08-01

    Full Text Available In this paper security constraints unit commitment (SCUC in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested for many researchers and network operators. Using Electrical Vehicles (PEVs and wind power for energy production is one of the newest proposed methods for replacing fossil fuels.One of the effective strategies for analyzing of the effects of Vehicle 2 Grid (V2G and wind power in optimal operation of generation is running of SCUC for power systems that are equipped with V2G and wind power resources. In this paper, game theory method is employed for deterministic solution of day-ahead unit commitment with considering security constraints in the simultaneous presence of V2G and wind power units. This problem for two scenarios of grid-controlled mode and consumer-controlled mode in three different days with light, medium and heavy load profiles is analyzed. Simulation results show the effectiveness of the presence of V2G and wind power for decreasing of generation cost and improving operation indices of power systems.

  6. Approach and plan for cleanup actions in the 100-FR-2 operable unit of the Hanford Site, Revision 0

    International Nuclear Information System (INIS)

    1995-06-01

    A new administrative approach is being used to reach a cleanup decision for the 100-FR-2 Operable Unit. The unit, located at the 100-F Area, contains solid waste sites and is one of the remaining operable units scheduled for characterization and cleanup in the 100 Area. This Focus Package (1) describes the new approach and activities needed to reach a decision on cleanup actions for the 100-FR-2 Operable Unit and (2) invites public participation into the planning process. The previous approach included the production of a Work Plan, a Limited Field Investigation Report, a Qualitative Risk Assessment, a Focused Feasibility Study, and a Proposed Plan, all culminating in an interim action Record of Decision. Information gathered to date on other operable units allows the analgous site approach to be used on the 100-FR-2 Operable Unit, and therefore, a reduction in documentation preparation. The U.S. Environmental Protection Agency, Washington State Department of Ecology, and the U.S. Department of Energy (Tri-Party Agreement) believe that the new approach will save time and funding. In the new approach, the Work Plan has been condensed into this 12 page Focus Package. The Focus Package includes a summary of 100-F Area information, a list of waste sites in the 100-FR-2 Operable Unit, a summary of proposed work, and a schedule. The new approach will also combine the Limited Field Investigation and Qualitative Risk Assessment reports into the Focused Feasibility Study. The Focused Feasibility Study will analyze methods and costs to clean up waste sites. Consolidating the documents should reduce the time to complete the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process by 16 months, compared to the previous approach

  7. Operational Stress Control and Readiness (OSCAR): The United States Marine Corps Initiative to Deliver Mental Health Services to Operating Forces

    National Research Council Canada - National Science Library

    Nash, William P

    2006-01-01

    .... The role of military mental health professionals in combat/operational stress control is to adapt scientific tools for prevention, identification, and treatment for use by military leaders at all levels...

  8. Operating Room Within the Neonatal Intensive Care Unit--Experience of a Medical Center in Taiwan.

    Science.gov (United States)

    Wang, Ya-Lei; Jeng, Suh-Fang; Tsao, Po-Nien; Chou, Hung-Chieh; Chen, Chien-Yi; Hsieh, Wu-Shiun

    2015-08-01

    Most neonates who reside in the neonatal intensive care unit (NICU) and require surgery are transferred to the operating room (OR) or undergo bedside surgery. However, critically ill neonates who are transferred often encounter the risk of complications. An OR in our NICU was therefore launched in 2009. This study was to appraise the surgeries performed in the NICU OR and compare results with the traditional main OR outside the NICU. This was a retrospective study in the NICU of a tertiary center. Retrospective chart review was conducted for all neonates who underwent surgical procedures in the NICU OR and the main OR. The information regarding baseline characteristics, surgical procedures and duration, ventilator use, hypothermia, hyperglycemia, instrument dislocations, surgically related infection or complications, and outcomes was obtained. There were a total of 65 patients in this study, 37 in the NCIU OR group and 28 in the main OR group. The presurgical mean airway pressure and the fraction of inspired oxygen (FiO2) were comparable between the two groups, but the postsurgical FiO2 was significantly lower in the NICU OR group (31.0%) than in the main OR group (40.9%; p = 0.027). Furthermore, the NICU OR group required a significantly shorter preoperation waiting time (34.4 minutes vs. 63.6 minutes, p = 0.001) and had a lower incidence of hypothermia than the main OR group (8.1% vs. 39.3%, p = 0.008). However, surgically related complications were similar between groups. The OR within the NICU may reduce the risk of complications during transportation and provide continuity of care to critically ill neonates. It also decreases the disturbance to other NICU patients during operation. Copyright © 2014. Published by Elsevier B.V.

  9. GROUDWATER REMEDIATION AT THE 100-HR-3 OPERABLE UNIT HANFORD, SITE WASHINGTON, USA - 11507

    International Nuclear Information System (INIS)

    Smoot, J.L.; Biebesheimer, F.H.; Eluskie, J.A.; Spiliotopoulos, A.; Tonkin, M.J.; Simpkin, T.

    2011-01-01

    The 100-HR-3 Groundwater Operable Unit (OU) at the Hanford Site underlies three former plutonium production reactors and the associated infrastructure at the 100-D and 100-H Areas. The primary contaminant of concern at the site is hexavalent chromium; the secondary contaminants are strontium-90, technetium-99, tritium, uranium, and nitrate. The hexavalent chromium plume is the largest plume of its type in the state of Washington, covering an area of approximately 7 km 2 (2.7 mi 2 ) with concentrations greater than 20 (micro)g/L. Concentrations range from 60,000 (micro)g/L near the former dichromate transfer station in the 100-D Area to large areas of 20 to 100 (micro)g/L across much of the plume area. Pump-and-treat operations began in 1997 and continued into 2010 at a limited scale of approximately 200 gal/min. Remediation of groundwater has been fairly successful in reaching remedial action objectives (RAOs) of 20 (micro)g/L over a limited region at the 100-H, but less effective at 100-D. In 2000, an in situ, permeable reactive barrier was installed downgradient of the hotspot in 100-D as a second remedy. The RAOs are still being exceeded over a large portion of the area. The CH2M HILL Plateau Remediation Company was awarded the remediation contract for groundwater in 2008 and initiated a remedial process optimization study consisting of modeling and technical studies intended to enhance the remediation. As a result of the study, 1,400 gal/min of expanded treatment capacity are being implemented. These new systems are designed to meet 2012 and 2020 target milestones for protection of the Columbia River and cleanup of the groundwater plumes.

  10. Operating room fire prevention: creating an electrosurgical unit fire safety device.

    Science.gov (United States)

    Culp, William C; Kimbrough, Bradly A; Luna, Sarah; Maguddayao, Aris J

    2014-08-01

    To reduce the incidence of surgical fires. Operating room fires represent a potentially life-threatening hazard and are triggered by the electrosurgical unit (ESU) pencil. Carbon dioxide is a fire suppressant and is a routinely used medical gas. We hypothesize that a shroud of protective carbon dioxide covering the tip of the ESU pencil displaces oxygen, thereby preventing fire ignition. Using 3-dimensional modeling techniques, a polymer sleeve was created and attached to an ESU pencil. This sleeve was connected to a carbon dioxide source and directed the gas through multiple precisely angled ports, generating a cone of fire-suppressive carbon dioxide surrounding the active pencil tip. This device was evaluated in a flammability test chamber containing 21%, 50%, and 100% oxygen with sustained ESU activation. The sleeve was tested with and without carbon dioxide (control) until a fuel was ignited or 30 seconds elapsed. Time to ignition was measured by high-speed videography. Fires were ignited with each control trial (15/15 trials). The control group median ± SD ignition time in 21% oxygen was 3.0 ± 2.4 seconds, in 50% oxygen was 0.1 ± 1.8 seconds, and in 100% oxygen was 0.03 ± 0.1 seconds. No fire was observed when the fire safety device was used in all concentrations of oxygen (0/15 trials; P fire ignition was 76% to 100%. A sleeve creating a cone of protective carbon dioxide gas enshrouding the sparks from an ESU pencil effectively prevents fire in a high-flammability model. Clinical application of this device may reduce the incidence of operating room fires.

  11. 8 December 1953 - 8 December 1963. Atomic co-operation in the United Nations

    International Nuclear Information System (INIS)

    1964-01-01

    Full text: Ten years ago, on 8 December 1953, President Eisenhower proposed to the General Assembly of the United Nations measures to build 'a new avenue to peace'. This was the beginning of the idea that international understanding can be fostered through peaceful atomic co-operation in an international organization. Re-reading the President's statement ten years later, one is impressed by the continued urgency of his message. What he said in fact was that the nations of the world were living in the shadow of an overwhelming atomic threat and that steps were necessary, even though modest and untried, to break the impasse between the East and the West in the very field which caused the most profound concern - atomic energy. The International Atomic Energy Agency became an institutional reality in 1957, when the first General Conference met with 56 members. It now has 83 members, and a further five nations will become members as soon as statutory formalities are completed. The activity on the part of the Agency during these six years has gradually expanded, although it has fallen short of earlier hopes in certain areas. Time and patience, however, have been required and 1963 foreshadows further progress. Ten years after the proposal of the idea, scientists and statesmen can look back and be gratified that a contribution has been made to international understanding. Scientists and statesmen can look ahead, hopefully, to a future of increasing activity in this special agency to develop co-operation and agreement in the field of atomic energy. (author)

  12. Reserve valuation in electric power systems

    Science.gov (United States)

    Ruiz, Pablo Ariel

    Operational reliability is provided in part by scheduling capacity in excess of the load forecast. This reserve capacity balances the uncertain power demand with the supply in real time and provides for equipment outages. Traditionally, reserve scheduling has been ensured by enforcing reserve requirements in the operations planning. An alternate approach is to employ a stochastic formulation, which allows the explicit modeling of the sources of uncertainty. This thesis compares stochastic and reserve methods and evaluates the benefits of a combined approach for the efficient management of uncertainty in the unit commitment problem. Numerical studies show that the unit commitment solutions obtained for the combined approach are robust and superior with respect to the traditional approach. These robust solutions are especially valuable in areas with a high proportion of wind power, as their built-in flexibility allows the dispatch of practically all the available wind power while minimizing the costs of operation. The scheduled reserve has an economic value since it reduces the outage costs. In several electricity markets, reserve demand functions have been implemented to take into account the value of reserve in the market clearing process. These often take the form of a step-down function at the reserve requirement level, and as such they may not appropriately represent the reserve value. The value of reserve is impacted by the reliability, dynamic and stochastic characteristics of system components, the system operation policies, and the economic aspects such as the risk preferences of the demand. In this thesis, these aspects are taken into account to approximate the reserve value and construct reserve demand functions. Illustrative examples show that the demand functions constructed have similarities with those implemented in some markets.

  13. 5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system

    CERN Document Server

    Ferlin, G; Claudet, S; Pezzetti, M

    2015-01-01

    Since 2009, the Large Hadron Collider (LHC) is in operation at CERN. The LHC superconducting magnets distributed over eight sectors of 3.3-km long are cooled at 1.9 K in pressurized superfluid helium. The nominal operating temperature of 1.9 K is produced by eight 1.8-K refrigeration units based on centrifugal cold compressors (3 or 4 stages depending to the vendor) combined with warm volumetric screw compressors with sub-atmospheric suction. After about 5 years of continuous operation, we will present the results concerning the availability for the final user of these refrigeration units and the impact of the design choice on the recovery time after a system trip. We will also present the individual results for each rotating machinery in terms of failure origin and of Mean Time between Failure (MTBF), as well as the consolidations and upgrades applied to these refrigeration units.

  14. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Units 1 and 2 were down for the first half of the year caused by the fire of March 1975. Net electrical power generated by Unit 1 this year was 1,301,183 MWH with the generator on line 2,175.25 hrs. Unit 2 generated 1,567,170 MWH with the generator on line 2,548.73 hrs. Unit 3 began full power operation on November 20th and generated 1,416,891 MWH with the generator on line 2,058.20 hrs. Information is presented concerning operations, fuel performance, surveillance testing, containment leak testing, changes, power generation, shutdown and forced reductions, coolant chemistry, occupational radiation exposures, and maintenance

  15. Final Environmental Statement related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1985-09-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with Beaver Valley Power Station Unit 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs, and concludes that the action called for is the issuance of an operating license for Beaver Valley Unit 2

  16. Schizoaffective Disorder in an acute psychiatric unit: Profile of users and agreement with Operational Criteria (OPCRIT

    Directory of Open Access Journals (Sweden)

    Ryola Singh

    2016-05-01

    Full Text Available Background: Schizoaffective Disorder is a controversial and poorly understood diagnosis. Experts disagree on whether it is a discrete disorder; whether it is on a spectrum between Bipolar Disorder and Schizophrenia or whether it even exists. Lack of individual research attention given to this disorder, changing diagnostic criteria and hence poor diagnostic stability have all contributed to the dearth of knowledge surrounding Schizoaffective Disorder. Objectives: To describe the profile of mental health care users (MHCUs diagnosed with Schizoaffective Disorder and determine the degree of agreement between the clinicians’ diagnosis and Operational Criteria (OPCRIT. Method: All MHCUs at Helen Joseph Hospital psychiatric unit with Schizoaffective Disorder between 01 January 2004 and 31 December 2010 were included. The demographic, clinical and treatment profiles as well as data required for OPCRIT were extracted from hospital records and discharge summaries. Results: Most MHCUs with Schizoaffective Disorder were female (68.89%, with a mean age of illness onset of 25 years (SD ± 7.11, had a family history of mood disorders (76.92% and displayed impaired functioning. Majority (80% were treated with at least one antipsychotic and one mood stabiliser. No agreement was found between the clinicians’ diagnosis and OPCRIT. Conclusion: While the profile of MHCUs with Schizoaffective Disorder in this study is similar to other studies, the lack of agreement between the clinicians’ and OPCRIT diagnoses calls for further research using larger population samples and a dimensional approach to diagnoses in order to improve understanding and management of Schizoaffective Disorder.

  17. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2

    International Nuclear Information System (INIS)

    1995-09-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985). Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992). Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), Supplement No. 12 (October 1993). Supplement No. 13 (April 1994), Supplement No. 14 (December 1994), and Supplement No. 15 (June 1995) issued by the Office of Nuclear Reactor Regulation of the U.S. Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos, 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER

  18. First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit

    CERN Document Server

    Antoine, A; Magnin, N; Juteau, P; Voumard, N

    2011-01-01

    Two LHC Beam Dumping Systems (LBDS) remove the counter-rotating beams safely from the collider during setting up of the accelerator, at the end of a physics run and in case of emergencies. Dump requests can come from 3 different sources: the machine protection system in emergency cases, the machine timing system for scheduled dumps or the LBDS itself in case of internal failures. These dump requests are synchronized with the 3 μs beam abort gap in a fail-safe redundant Trigger Synchronization Unit (TSU) based on a Digital Phase Locked Loop (DPLL), locked onto the LHC beam revolution frequency with a maximum phase error of 40 ns. The synchronized trigger pulses coming out of the TSU are then distributed to the high voltage generators of the beam dump kickers through a redundant fault-tolerant trigger distribution system. This paper describes the operational experience gained with the TSU since its commissioning with beam in 2009, and highlights the improvements, which have been implemented f...

  19. Health risks associated with ingesting venison from a uranium enrichment facility with multiple operable units

    International Nuclear Information System (INIS)

    Duncan, J.; Welsh, C.

    1995-01-01

    Ingestion of game, including venison, may be a significant exposure pathway in human health risk assessments at hazardous waste sites. The difficulty associated with modeling contaminant tissue concentrations in a wide-ranging herbivorous mammal is compounded when the home range of the mammal extends over multiple operable units (OUs) of varying size and media contaminant concentration. Using biotransfer factors extracted from the literature and species-specific parameter information (e.g., home range size, diet, forage and water ingestion rates) the authors estimate contaminant concentrations in venison based on soil and surface water contaminant concentrations and determine the contribution of individual OUs to modeled venison tissue concentrations. Estimated tissue concentrations are calculated through the use of site foraging factors (SFFS) that adjust exposure contributions from individual OUs to account for the size of the OU in relation to the animals home range. The authors then use the venison tissue concentrations to estimate human health risk associated with ingesting venison under both a current and future exposure scenario

  20. Leveraging Telemedicine Infrastructure to Monitor Quality of Operating Room to Intensive Care Unit Handoffs.

    Science.gov (United States)

    Barry, Mark E; Hochman, Beth R; Lane-Fall, Meghan B; Zappile, Denise; Holena, Daniel N; Smith, Brian P; Kaplan, Lewis J; Huffenberger, Ann; Reilly, Patrick M; Pascual, Jose L

    2017-07-01

    To analyze in-room video recordings of operating room (OR) to intensive care unit (ICU) handoffs to determine tempo and quality of team interactions on nights and weekends compared with weekdays, and to demonstrate how existing telemedicine technology can be used to evaluate handoffs. This prospective observational study of OR-to-ICU bedside handoffs was conducted in the surgical ICU of the Hospital of the University of Pennsylvania in July 2014-January 2015. Handoff video recordings were obtained for quality improvement purposes using existing telemedicine cameras. Evaluators used adapted validated in-person assessment measures to analyze basic characteristics and quality measures (timing, report types, report duration, presence of physical exam, teamwork skills, engagement, report delivery skills, listening skills, interruptions, unprofessional comments or actions). Sixteen weekday and 16 night and weekend handoffs were compared. There were no significant differences in basic characteristics. Most quality measures were similar on weekdays compared with nights and weekends. Surgeons demonstrated better report delivery skills and engagement on nights and weekends (P = .002 and P = .04, respectively), whereas OR anesthesiologists' scores were similar during both time frames. This study presents a novel approach of assessing handoff quality in OR-to-ICU handoffs using an existing telemedicine infrastructure. Using this approach, quality measures of night and weekend handoffs were found to be no worse-and sometimes better-than those during weekdays. Video analysis may emerge as an ideal unobtrusive quality improvement methodology to monitor handoffs and improve education and compliance with institutional handoff policies.

  1. 200-UP-1 Operable Unit borehole summary report for FY 1995

    International Nuclear Information System (INIS)

    Darrach, M.E.

    1996-07-01

    This report details the well construction, sampling, analyses, and geologic character of the Ringold Formation as it was encountered in five wells drilled in the 200-UP-1 Operable Unit during fiscal year (FY) 1995. The 200-UP-1 Interim Remedial Measure Drilling Description of Work was prepared to support the FY 95 field work and presented the specific field activities and procedural requirements to be implemented. The geology of the vadose zone is not described in the text of this report. Vadose zone geology in the immediate area is characterized in sufficient detail in existing documents. However, the borehole logs and well summary sheets provided in the appendices depict the vadose zone stratigraphy and well construction details. Sieve analyses conducted on sediments from the saturated zone were used to design the well completions; these analyses are included. Where applicable, inferences are made concerning the geologic character of the saturated interval. In addition, a synopsis of the preliminary well development process is outlined. Other related information is included with this report as supplemental data

  2. PROGRAM EVALUATION INVOLVEMENT INDONESIAN NATIONAL ARMED FORCES (TNI ON MISSION UNITED NATIONS PEACEKEEPING OPERATIONS (UNPKO

    Directory of Open Access Journals (Sweden)

    I Gede Sumertha KY

    2017-07-01

    Full Text Available This research is constructed in order to study and to evaluate involvement TNI on mission United Nations Peacekeeping Operations (UNPKO in Lebanon program FY 2014-2015 due to achieve vision 4000 Peacekeepers. The CIPP model is using on apply the qualitative method for the research with consist of four evaluation components: (1 context; (2 input; (3 process; (4 product. The mechanism collecting data were collected through interviews, observations, questionnaires and documentation study. There are three levels of evaluation for judgment each aspect: low, moderate, and high. The summarized results and figured into case-order effect matrix was figure out of the categorization.The results of this research indicate that TNI involvement in mission UNPKO Lebanon, aspire to increase the number of peacekeepers up to 4.000 personnel in the category “high”, but still have some minor additional improvement especially on coordination among stakeholders. This is because the Results of Context Evaluation has a category of "high" with a scale of assessment "many" (75.3%; the Results of Input Evaluation has a category of "high" with a scale of assessment "moderate" (60.6%; the Results of Process Evaluation has a category of "high" with a scale of assessment "moderate" (65.3% and the Results of Product Evaluation has a category of "high" with a scale of assessment "moderate" (63.3% .

  3. Data validation report for the 100-FR-3 Operable Unit, third round groundwater samples

    Energy Technology Data Exchange (ETDEWEB)

    Ayres, J.M.

    1994-03-31

    Westinghouse-Hanford has requested that a minimum of 20% of the total number of Sample Delivery Groups be validated for the 100-FR-3 operable Unit Third Round Groundwater sampling investigation. Therefore, the data from the chemical analysis of 51 samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site. The report is broken down into sections for each chemical analysis and radiochemical analysis type. Each section addresses the data package completeness, holding time adherence, instrument calibration and tuning acceptability, blank results, accuracy, precision, system performance, as well as the compound identification and quantitation. In addition, each section has an overall assessment and summary for the data packages reviewed for the particular chemical/radiochemical analyses. Detailed backup information is provided to the reader by SDG No. and sample number. For each data package, a matrix of chemical analyses per sample number is presented, as well as data qualification summaries.

  4. Identification of Promising Remediation Technologies for Iodine in the UP-1 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lee, Brady D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Qafoku, Nikolla [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Szecsody, James E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Vermeul, Vincent R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-09-01

    Iodine-129 (129I) generated at the U.S. Department of Energy (DOE) Hanford Site during plutonium production was released to the subsurface, resulting in several large, though dilute, plumes in the groundwater, including the plume in the 200-UP-1 operable unit (OU). Because 129I is an uncommon contaminant, relevant remediation experience and scientific literature are limited, though work is under way to better understand the fate and transport of 129I in the environment and the effectiveness of potential remediation technologies. The recent UP-1 Evaluation Plan for Iodine and report on the Conceptual Model of Iodine Behavior in the Subsurface at the Hanford Site provide information on the history of contamination in the 200-UP-1 OU, relevant controlling processes (biological and geochemical), risk, the conceptual site model, and potential remedial options, which provided a foundation for this study. In this study, available information was compiled and used to categorize potential remediation technologies, culminating in a recommendation of promising technologies for further evaluation. Approaches to improve the technical information about promising technologies are also recommended in this study so that a subsequent evaluation of potential remediation alternatives can assess these technologies.

  5. Technological developments in real-time operational hydrologic forecasting in the United States

    Science.gov (United States)

    Hudlow, Michael D.

    1988-09-01

    The hydrologic forecasting service of the United States spans applications and scales ranging from those associated with the issuance of flood and flash warnings to those pertaining to seasonal water supply forecasts. New technological developments (underway in or planned by the National Weather Service (NWS) in support of the Hydrologic Program) are carried out as combined efforts by NWS headquarters and field personnel in cooperation with other organizations. These developments fall into two categories: hardware and software systems technology, and hydrometeorological analysis and prediction technology. Research, development, and operational implementation in progress in both of these areas are discussed. Cornerstones of an overall NWS modernization effort include implementation of state-of-the-art data acquisition systems (including the Next Generation Weather Radar) and communications and computer processing systems. The NWS Hydrologic Service will capitalize on these systems and will incorporate results from specific hydrologic projects including collection and processing of multivariate data sets, conceptual hydrologic modeling systems, integrated hydrologic modeling systems with meteorological interfaces and automatic updating of model states, and extended streamflow prediction techniques. The salient aspects of ongoing work in these areas are highlighted in this paper, providing some perspective on the future U.S. hydrologic forecasting service and its transitional period into the 1990s.

  6. Qualitative research within trials: developing a standard operating procedure for a clinical trials unit

    Science.gov (United States)

    2013-01-01

    Background Qualitative research methods are increasingly used within clinical trials to address broader research questions than can be addressed by quantitative methods alone. These methods enable health professionals, service users, and other stakeholders to contribute their views and experiences to evaluation of healthcare treatments, interventions, or policies, and influence the design of trials. Qualitative data often contribute information that is better able to reform policy or influence design. Methods Health services researchers, including trialists, clinicians, and qualitative researchers, worked collaboratively to develop a comprehensive portfolio of standard operating procedures (SOPs) for the West Wales Organisation for Rigorous Trials in Health (WWORTH), a clinical trials unit (CTU) at Swansea University, which has recently achieved registration with the UK Clinical Research Collaboration (UKCRC). Although the UKCRC requires a total of 25 SOPs from registered CTUs, WWORTH chose to add an additional qualitative-methods SOP (QM-SOP). Results The qualitative methods SOP (QM-SOP) defines good practice in designing and implementing qualitative components of trials, while allowing flexibility of approach and method. Its basic principles are that: qualitative researchers should be contributors from the start of trials with qualitative potential; the qualitative component should have clear aims; and the main study publication should report on the qualitative component. Conclusions We recommend that CTUs consider developing a QM-SOP to enhance the conduct of quantitative trials by adding qualitative data and analysis. We judge that this improves the value of quantitative trials, and contributes to the future development of multi-method trials. PMID:23433341

  7. ALTERNATIVE REMEDIATION TECHNOLOGY STUDY FOR GROUNDWATER TREATMENT AT 200-PO-1 OPERABLE UNIT AT HANFORD SITE

    Energy Technology Data Exchange (ETDEWEB)

    DADO MA

    2008-07-31

    This study focuses on the remediation methods and technologies applicable for use at 200-PO-I Groundwater Operable Unit (OU) at the Hanford Site. The 200-PO-I Groundwater au requires groundwater remediation because of the existence of contaminants of potential concern (COPC). A screening was conducted on alternative technologies and methods of remediation to determine which show the most potential for remediation of groundwater contaminants. The possible technologies were screened to determine which would be suggested for further study and which were not applicable for groundwater remediation. COPCs determined by the Hanford Site groundwater monitoring were grouped into categories based on properties linking them by remediation methods applicable to each COPC group. The screening considered the following criteria. (1) Determine if the suggested method or technology can be used for the specific contaminants found in groundwater and if the technology can be applied at the 200-PO-I Groundwater au, based on physical characteristics such as geology and depth to groundwater. (2) Evaluate screened technologies based on testing and development stages, effectiveness, implementability, cost, and time. This report documents the results of an intern research project conducted by Mathew Dado for Central Plateau Remediation in the Soil and Groundwater Remediation Project. The study was conducted under the technical supervision of Gloria Cummins and management supervision of Theresa Bergman and Becky Austin.

  8. Qualitative research within trials: developing a standard operating procedure for a clinical trials unit.

    Science.gov (United States)

    Rapport, Frances; Storey, Mel; Porter, Alison; Snooks, Helen; Jones, Kerina; Peconi, Julie; Sánchez, Antonio; Siebert, Stefan; Thorne, Kym; Clement, Clare; Russell, Ian

    2013-02-21

    Qualitative research methods are increasingly used within clinical trials to address broader research questions than can be addressed by quantitative methods alone. These methods enable health professionals, service users, and other stakeholders to contribute their views and experiences to evaluation of healthcare treatments, interventions, or policies, and influence the design of trials. Qualitative data often contribute information that is better able to reform policy or influence design. Health services researchers, including trialists, clinicians, and qualitative researchers, worked collaboratively to develop a comprehensive portfolio of standard operating procedures (SOPs) for the West Wales Organisation for Rigorous Trials in Health (WWORTH), a clinical trials unit (CTU) at Swansea University, which has recently achieved registration with the UK Clinical Research Collaboration (UKCRC). Although the UKCRC requires a total of 25 SOPs from registered CTUs, WWORTH chose to add an additional qualitative-methods SOP (QM-SOP). The qualitative methods SOP (QM-SOP) defines good practice in designing and implementing qualitative components of trials, while allowing flexibility of approach and method. Its basic principles are that: qualitative researchers should be contributors from the start of trials with qualitative potential; the qualitative component should have clear aims; and the main study publication should report on the qualitative component. We recommend that CTUs consider developing a QM-SOP to enhance the conduct of quantitative trials by adding qualitative data and analysis. We judge that this improves the value of quantitative trials, and contributes to the future development of multi-method trials.

  9. Micro-cogeneration units based on Stirling engine for heating and their real operation

    Science.gov (United States)

    Čierny, Jaroslav; Patsch, Marek

    2014-08-01

    This article was deal with micro-cogeneration units based on Stirling engine. We watched problematic of real working Stirling engine. The article also contain hookup of unit constructed at University of Zilina.

  10. Surry Power Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electric power generated by Unit 1 was 2,315,124 MWH(e) and Unit 2 generated 2,062,954 MWH(e) with Unit 1 generator on line for 3,157.8 hrs and Unit 2 on line for 2,881.2 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  11. Loss of vital ac power and the residual heat removal system during mid-loop operations at Vogtle Unit 1 on March 20, 1990

    International Nuclear Information System (INIS)

    1990-06-01

    On March 20, 1990, the Vogtle Electric Generating Plant Unit 1, located in Burke County, Georgia, about 25 miles southeast of Augusta, experienced a loss of all safety (vital) ac power. The plant was in cold shutdown with reactor coolant level lowered to ''mid-loop'' for various maintenance tasks. Both the containment building personnel hatch and equipment hatch were open. One emergency diesel generator and one reserve auxiliary transformer were out of service for maintenance, with the remaining reserve auxiliary transformer supplying both Unit 1 safety buses. A truck in the low voltage switchyard backed into the support column for an offsite power feed to the reserve auxiliary transformer which was supplying safety power. The insulator broke, a phase-to-ground fault occurred, and the feeder circuit breakers for the safety buses opened. The operable emergency diesel generator started automatically because of the undervoltage condition on the safety bus, but tripped off after about 1 minute. About 20 minutes later the diesel generator load sequencer was reset, causing the diesel generator to start a second time. The diesel generator operated for about 1 minute, and tripped off. The diesel generator was restarted in the manual emergency mode 36 minutes after the loss of power. The generator remained on line and provided power to its safety bus. During the 36 minutes without safety bus power, the reactor coolant system temperature rose from about 90 degree F to 136 degree F. This report documents the results of an Incident Investigation Team sent to Vogtle by the Executive Director for Operations of the US Nuclear Regulatory Commission to determine what happened, identify the probable causes, and make appropriate findings and conclusions. 79 figs., 16 tabs

  12. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  13. 33 CFR 125.53 - Requirements for credentials; certain vessels operating on navigable waters of the United States...

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Requirements for credentials; certain vessels operating on navigable waters of the United States (including the Great Lakes and Western Rivers). 125.53 Section 125.53 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND...

  14. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  15. 40 CFR Table 5 to Subpart Ppp of... - Process Vents From Batch Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Science.gov (United States)

    2010-07-01

    ... Operations-Monitoring, Recordkeeping, and Reporting Requirements 5 Table 5 to Subpart PPP of Part 63... Hazardous Air Pollutant Emissions for Polyether Polyols Production Pt. 63, Subpt. PPP, Table 5 Table 5 to Subpart PPP of Part 63—Process Vents From Batch Unit Operations—Monitoring, Recordkeeping, and Reporting...

  16. 40 CFR Table 6 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Science.gov (United States)

    2010-07-01

    ... Operations-Monitoring, Recordkeeping, and Reporting Requirements 6 Table 6 to Subpart PPP of Part 63... Hazardous Air Pollutant Emissions for Polyether Polyols Production Pt. 63, Subpt. PPP, Table 6 Table 6 to Subpart PPP of Part 63—Process Vents From Continuous Unit Operations—Monitoring, Recordkeeping, and...

  17. 40 CFR Table 7 to Subpart Ppp of... - Process Vents From Continuous Unit Operations-Monitoring, Recordkeeping, and Reporting Requirements

    Science.gov (United States)

    2010-07-01

    ... Operations-Monitoring, Recordkeeping, and Reporting Requirements 7 Table 7 to Subpart PPP of Part 63... Hazardous Air Pollutant Emissions for Polyether Polyols Production Pt. 63, Subpt. PPP, Table 7 Table 7 to Subpart PPP of Part 63—Process Vents From Continuous Unit Operations—Monitoring, Recordkeeping, and...

  18. Safety evaluation report related to the operation of Shoreham Nuclear Power Station, Unit No. 1. Docket No. 50-322

    International Nuclear Information System (INIS)

    1983-02-01

    Supplement No. 3 to the Safety Evaluation Report of Long Island Lighting Company's application for a license to operate the Shoreham Nuclear Power Station, Unit 1, located in Suffolk County, New York, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement addresses several items that have come to light since the previous supplement was issued

  19. Teaching Mass Transfer and Filtration Using Crossflow Reverse Osmosis and Nanofiltration: An Experiment for the Undergraduate Unit Operations Lab

    Science.gov (United States)

    Anastasio, Daniel; McCutcheon, Jeffrey

    2012-01-01

    A crossflow reverse osmosis (RO) system was built for a senior-level chemical engineering unit operations laboratory course. Intended to teach students mass transfer fundamentals related to membrane separations, students tested several commercial desalination membranes, measuring water flux and salt rejections at various pressures, flow rates, and…

  20. 76 FR 388 - Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice...

    Science.gov (United States)

    2011-01-04

    ... Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice of Consideration of Issuance... Web site http://www.regulations.gov . Because your comments will not be edited to remove any... will not edit their comments to remove any identifying or contact information, and therefore, they...

  1. 76 FR 30206 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice...

    Science.gov (United States)

    2011-05-24

    ... Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice of Consideration of Issuance..., http://www.regulations.gov . Because your comments will not be edited to remove any identifying or... received from other persons for submission to the NRC inform those persons that the NRC will not edit their...

  2. The Building Blocks for JWST I and T (Integrations and Test) to Operations - From Simulator to Flight Units

    Science.gov (United States)

    Fatig, Curtis; Ochs, William; Johns, Alan; Seaton, Bonita; Adams, Cynthia; Wasiak, Francis; Jones, Ronald; Jackson, Wallace

    2012-01-01

    The James Webb Space Telescope (JWST) Project has an extended integration and test (I&T) phase due to long procurement and development times of various components as well as recent launch delays. The JWST Ground Segment and Operations group has developed a roadmap of the various ground and flight elements and their use in the various JWST I&T test programs. The JWST Project s building block approach to the eventual operational systems, while not new, is complex and challenging; a large-scale mission like JWST involves international partners, many vendors across the United States, and competing needs for the same systems. One of the challenges is resource balancing so simulators and flight products for various elements congeal into integrated systems used for I&T and flight operations activities. This building block approach to an incremental buildup provides for early problem identification with simulators and exercises the flight operations systems, products, and interfaces during the JWST I&T test programs. The JWST Project has completed some early I&T with the simulators, engineering models and some components of the operational ground system. The JWST Project is testing the various flight units as they are delivered and will continue to do so for the entire flight and operational system. The JWST Project has already and will continue to reap the value of the building block approach on the road to launch and flight operations.

  3. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text

    International Nuclear Information System (INIS)

    1996-03-01

    This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch River/Poplar Creek Operable Unit (CR/PC OU), an off-site OU associated with environmental restoration activities at the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). As a result of past, present, and potential future releases of hazardous substances into the environment, the ORR was placed on the National Priorities List in December 1989 (54 FR 48184). Sites on this list must be investigated for possible remedial action, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 42 U.S.C. 9601, et seq.). This report documents the findings of the remedial investigation of this OU and the feasibility of potential remedial action alternatives. These studies are authorized by Sect. 117 of CERCLA and were conducted in accordance with the requirements of the National Contingency Plan (40 CFR Part 300). DOE, the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC) have entered into a Federal Facility Agreement (FFA), as authorized by Sect. 120 of CERCLA and Sects. 3008(h) and 6001 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et seq.). The purpose of this agreement is to ensure a coordinated and effective response for all environmental restoration activities occurring at the ORR. In addition to other responsibilities, the FFA parties mutually define the OU boundaries, set remediation priorities, establish remedial investigation priorities and strategies, and identify and select remedial actions. A copy of this FFA is available from the DOE Information Resource Center in Oak Ridge, Tennessee

  4. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 1. Main text

    International Nuclear Information System (INIS)

    1995-09-01

    This is the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include 137 Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and 137 Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River

  5. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 3. Appendix E

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains Appendix E: Toxicity Information and Uncertainty Analysis, description of methods, from the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

  6. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 1. Main text

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This is the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

  7. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch River/Poplar Creek Operable Unit (CR/PC OU), an off-site OU associated with environmental restoration activities at the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). As a result of past, present, and potential future releases of hazardous substances into the environment, the ORR was placed on the National Priorities List in December 1989 (54 FR 48184). Sites on this list must be investigated for possible remedial action, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 42 U.S.C. 9601, et seq.). This report documents the findings of the remedial investigation of this OU and the feasibility of potential remedial action alternatives. These studies are authorized by Sect. 117 of CERCLA and were conducted in accordance with the requirements of the National Contingency Plan (40 CFR Part 300). DOE, the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC) have entered into a Federal Facility Agreement (FFA), as authorized by Sect. 120 of CERCLA and Sects. 3008(h) and 6001 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et seq.). The purpose of this agreement is to ensure a coordinated and effective response for all environmental restoration activities occurring at the ORR. In addition to other responsibilities, the FFA parties mutually define the OU boundaries, set remediation priorities, establish remedial investigation priorities and strategies, and identify and select remedial actions. A copy of this FFA is available from the DOE Information Resource Center in Oak Ridge, Tennessee.

  8. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 4. Appendix F

    International Nuclear Information System (INIS)

    1995-09-01

    This section contains ecotoxicological profiles for the COPECs for the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The ecotoxicological information is presented for only those endpoints for which the chemicals are COPECs. The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include 137 Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and 137 Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River

  9. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 3. Appendix E

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains Appendix E: Toxicity Information and Uncertainty Analysis, description of methods, from the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include 137 Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and 137 Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River

  10. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 4. Appendix F

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This section contains ecotoxicological profiles for the COPECs for the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The ecotoxicological information is presented for only those endpoints for which the chemicals are COPECs. The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

  11. Proposed plan for interim remedial measure at the 100-HR-3 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measure for addressing groundwater contamination at the 100-HR-3 Operable Unit, located at the Hanford Site, along the Columbia River. In addition, this plan includes a summary of other alternatives analyzed for the 100-HR-3 Operable Unit. The 100 Areas of the Hanford Site were placed on the Superfund National Priorities List (NPL) on November 3, 1989, because of soil and groundwater contamination resulting from the past operation of nuclear facilities. The preferred alternative described here is Institutional Control/Continued Current Actions. This alternative includes continued operation and evaluation of the Pilot-Scale Treatability Study located in the 100 D/DR Area, further evaluation of ecological risks through the Columbia River Comprehensive Impact Assessment, continued application of institutional controls and groundwater monitoring. Three areas make up the 100-HR-3 Operable Unit: 100 H Reactor area; 100 D/DR Reactor area; and the area between the H and D/DR reactors. Chromium is the main contaminant of concern in the groundwater below this area and is thought to be causing adverse impacts to the Columbia River and surrounding habitat

  12. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1977

    International Nuclear Information System (INIS)

    1978-01-01

    After a summary of reactor operating experiences, data are presented concerning amendments to the operating licenses and technical specifications, changes, modifications, tests, experiments, and maintenance of safety-related equipment

  13. Global Strategy Implementation at the Business Unit Level: Operational Capabilities and Administrative Mechanisms

    OpenAIRE

    Kendall Roth; David M Schweiger; Allen J Morrison

    1991-01-01

    The study examines the impact of internationally strategy on organizational design and the influence of the organizational design on effectiveness at the business unit level. The empirical findings are based on survey responses from eighty-two business units competing in global industries. The findings are supportive of the contingency notion which suggests that business unit effectiveness is a function of the fit between the international strategy and the organizational design.© 1991 JIBS. J...

  14. 40 CFR Table 21 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Reforming Units

    Science.gov (United States)

    2010-07-01

    ... Limits for Organic HAP Emissions From Catalytic Reforming Units 21 Table 21 to Subpart UUU of Part 63... Hazardous Air Pollutants for Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and... Compliance With Operating Limits for Organic HAP Emissions From Catalytic Reforming Units As stated in § 63...

  15. 40 CFR Table 14 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... Hazardous Air Pollutants for Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and... Limits for Organic HAP Emissions From Catalytic Cracking Units 14 Table 14 to Subpart UUU of Part 63... Compliance With Operating Limits for Organic HAP Emissions From Catalytic Cracking Units As stated in § 63...

  16. 40 CFR Table 7 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Metal HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... Hazardous Air Pollutants for Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and... Limits for Metal HAP Emissions From Catalytic Cracking Units 7 Table 7 to Subpart UUU of Part 63... With Operating Limits for Metal HAP Emissions From Catalytic Cracking Units As stated in § 63.1564(c)(1...

  17. The application of burnup credit for spent fuel operations in the United Kingdom

    International Nuclear Information System (INIS)

    Bowden, R.

    1998-01-01

    This paper begins by outlining the structure of the nuclear industry in the United Kingdom. It then sets out the methodology of burnup credit, and provides a brief discussion of the validation and robustness of the calculational route. This leads to a description of both the current and intended applications of burnup credit in the United Kingdom. (author)

  18. Quad-Cities Station, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated by Unit 1 was 3,393,062 MWH with the generator on line 5,703.0 hrs. Unit 2 generated 4,304,684 MWH with the generator on line 7,145.3 hrs. Information is presented concerning modifications, maintenance, power generation, shutdowns, occupational radiation exposures, and organization

  19. C-17 Weapons Instructor Course: Unit Basing to Optimize Operational Efficiency and Mission Effectiveness

    Science.gov (United States)

    2012-06-15

    attention and visibility it has. I would also like to thank Colonel Wyn Elder and Colonel Paul Murphy who provided support, encouragement, and backing...Welcome Package. https://wwwmil.nellis.af.mil/units/usafws/advsupp/advsmain.htm. 15 April, 2010. United States National Library of Medicine. HTA

  20. Record of Decision for Tank Farm Soil and INTEC Groundwater, Operable Unit 3-14

    Energy Technology Data Exchange (ETDEWEB)

    L. S. Cahn

    2007-05-16

    This decision document presents the selected remedy for Operable Unit (OU) 3-14 tank farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center (INTEC), which is located on the Idaho National Laboratory (INL) Site. The tank farm was initially evaluated in the OU 3-13 Record of Decision (ROD), and it was determined that additional information was needed to make a final decision. Additional information has been obtained on the nature and extent of contamination in the tank farm and on the impact to groundwater. The selected remedy was chosen in accordance with the Comprehensive Environmental Response, Liability and Compensation Act of 1980 (CERCLA) (42 USC 9601 et seq.), as amended by the Superfund Amendments and Reauthorization Act of 1986 (Public Law 99-499) and the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR 300). The selected remedy is intended to be the final action for tank farm soil and groundwater at INTEC. The response action selected in this ROD is necessary to protect the public health, welfare, or the environment from actual or threatened releases of hazardous substances into the environment. Such a release or threat of release may present an imminent and substantial endangerment to public health, welfare, or the environment. The remedial actions selected in this ROD are designed to reduce the potential threats to human health and the environment to acceptable levels. In addition, DOE-ID, EPA, and DEQ (the Agencies) have determined that no action is necessary under CERCLA to protect public health, welfare, or the environment at 16 sites located outside the tank farm boundary. The purposes of the selected remedy are to (1) contain contaminated soil as the radionuclides decay in place, (2) isolate current and future workers and biological receptors from contact with contaminated soil, and (3) restore the portion of Snake River Plain Aquifer contaminated by INTEC releases to Idaho Ground Water Quality

  1. BIOTIC INTEGRITY OF STREAMS IN THE SAVANNAH RIVER SITE INTEGRATOR OPERABLE UNITS, 1996 TO 2003

    Energy Technology Data Exchange (ETDEWEB)

    Paller, M; Susan Dyer, S

    2004-11-08

    The Savannah River Site (SRS) has been divided into six Integrator Operable Units (IOUs) that correspond to the watersheds of the five major streams on the SRS (Upper Three Runs, Fourmile Branch, Pen Branch, Steel Creek, and Lower Three Runs) and the portions of the Savannah River and Savannah River Swamp associated with the SRS. The streams are the primary integrators within each IOU because they potentially receive, through surface or subsurface drainage, soluble contaminants from all waste sites within their watersheds. If these contaminants reach biologically significant levels, they would be expected to effect the numbers, types, and health of stream organisms. In this study, biological sampling was conducted within each IOU as a measure of the cumulative ecological effects of the waste sites within the IOUs. The use of information from biological sampling to assess environmental quality is often termed bioassessment. The IOU bioassessment program included 38 sites in SRS streams and nine sites in the Savannah River. Sampling was conducted in 1996 to 1998, 2000, and 2003. Four bioassessment methods were used to evaluate ecological conditions in the IOU streams: the Index of Biotic Integrity, the Fish Health Assessment Index, measurement of fish tissue contaminant levels, and two benthic macroinvertebrate indices. The Index of Biotic Integrity (IBI) is an EPA supported method based on comparison of ecologically important and sensitive fish assemblage variables between potentially disturbed and reference (i.e., undisturbed) sites. It is designed to assess the ability of a stream to support a self-sustaining biological community and ecological processes typical of undisturbed, natural conditions. Since many types of contaminants can bioaccumulate, fish tissue contaminant data were used to determine the types of chemicals fish were exposed to and their relative magnitudes among IOUs. The Fish Health Assessment Index (HAI) is an EPA supported method for assessing

  2. Does the Future Engineer Force Transition Engineer Units between Offensive and Stability Operations in Ways That Achieve Responsiveness, Versatility, Agility, Effectiveness, and Efficiency?

    National Research Council Canada - National Science Library

    London, David T

    2005-01-01

    .... The main question is as follows: Does the FEF transition engineer units between offensive and stability operations in ways that achieve responsiveness, versatility, agility, effectiveness, and efficiency...

  3. Performance-Based Technology Selection Filter application report for Teledyne Wah Chang Albany Operable Unit Number One

    International Nuclear Information System (INIS)

    Richardson, J.G.; Morrison, J.L.; Morneau, R.A.; O'Brien, M.C.; Rudin, M.J.

    1992-05-01

    This report summarizes the application of the Performance-Based Technology Selection Filter (PBTSF) developed for the Idaho National Laboratory's Buried Waste Integrated Demonstration Program as applied to remediation activities conducted at the Teledyne Wah Chang Albany (TWCA) Superfund Site, Operable Unit One. The remedial action at the TWCA Operable Unit One consisted of solidification, excavation, transportation, and monocell disposal of the contents of two sludge ponds contaminated with various inorganic and organic compounds. Inorganic compounds included low levels of uranium and radium isotopes, as well zirconium, hafnium, chromium, mercury, and nickel. Organic compounds included methylene chloride, 1,1,1-trichloroethane, 1,1-dichloroethane, tetrachloroethane, and hexachlorobenzene. Remediation began in June 1991, and was completed in November 1991. The TWCA Operable Unit One configuration option consisted of 15 functional subelements. Data were gathered on these subelements and end-to-end system operation to calculate numerical values for 28 system performance measures. These were then used to calculate a system performance score. An assessment was made of the availability and definitional clarity of these performance measures, applicability of PBTSF utility functions, and rollup methodology. The PBTSF scoring function worked well, with few problems noted in data gathering, utility function normalization, and scoring calculation. The application of this process to an actual in situ treatment and excavation technical process option clarified the specific terms and bounds of the performance score functions, and identified one problem associated with the definition of system boundary

  4. Organization and methodology applied to the control of commissioning tests to guarantee safe operation of nuclear units

    International Nuclear Information System (INIS)

    Clausner, J.P.; Jorel, M.

    1990-12-01

    This paper describes the activities of the Safety Analysis Department (DAS), which provides technical support for the French safety authorities in the specific context of analysis and control of startup test programme quality at each of the different stages of the programme. These activities combine to ensure that the objective of the startup tests is reached, in particular that the functions of each safety-related system are guaranteed in all operating configurations, that the performance levels of all components in the system comply with design criteria and that defects revealed during previous tests have been dealt with correctly. The special case of French nuclear facilities, linked to unit standardization, has made it possible to acquire a large amount of experience with the startup of the 900 MWe units and has illustrated the importance of defining a startup test programme. In 1981, a working group, comprising operating organization and safety authority representatives, studied the lessons which had to be learned from 900 MWe unit startup and the improvements which could be made and taken into account in the 1300 MWe unit startup programme. To illustrate the approach adopted by the DAS, we go on to describe the lessons learned from startup of the first 1300 MWe (P4) units

  5. United States Department of Energy Nevada Operations Office Environmental Compliance Handbook. Third edition

    International Nuclear Information System (INIS)

    1998-03-01

    The Environment, Safety and Health Division (ESHD) of the Nevada Operations Office has prepared this Environmental Compliance Handbook for all users of the Nevada Test Site (NTS) and other US Department of Energy, Nevada Operations Office (DOE/NV) facilities. The Handbook gives an overview of the important environmental laws and regulations that apply to the activities conducted by the Nevada Operations Office and other users of DOE/NV facilities in Nevada

  6. United States Department of Energy Nevada Operations Office Environmental Compliance Handbook. Third edition

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The Environment, Safety & Health Division (ESHD) of the Nevada Operations Office has prepared this Environmental Compliance Handbook for all users of the Nevada Test Site (NTS) and other US Department of Energy, Nevada Operations Office (DOE/NV) facilities. The Handbook gives an overview of the important environmental laws and regulations that apply to the activities conducted by the Nevada Operations Office and other users of DOE/NV facilities in Nevada.

  7. Trend analysis of nuclear reactor automatic trip events subjected to operator's human error at United States nuclear power plants

    International Nuclear Information System (INIS)

    Takagawa, Kenichi

    2009-01-01

    Trends in nuclear reactor automatic trip events due to human errors during plant operating mode have been analyzed by extracting 20 events which took place in the United States during the period of seven years from 2002 to 2008, cited in the LERs (Licensee Event Reports) submitted to the US Nuclear Regulatory Commission (NRC). It was shown that the yearly number of events was relatively large before 2005, and thereafter the number decreased. A period of stable operation, in which the yearly number was kept very small, continued for about three years, and then the yearly number turned to increase again. Before 2005, automatic trip events occurred more frequently during periodic inspections or start-up/shut-down operations. The recent trends, however, indicate that trip events became more frequent due to human errors during daily operations. Human errors were mostly caused by the self-conceit and carelessness of operators through the whole period. The before mentioned trends in the yearly number of events might be explained as follows. The decrease in the automatic trip events is attributed to sharing trouble information, leading as a consequence to improvement of the manual and training for the operations which have a higher potential risk of automatic trip. Then, while the period of stable operation continued, some operators came to pay less attention to preventing human errors and not interest in the training, leading to automatic trip events in reality due to miss-operation. From these analyses on trouble experiences in the US, we learnt the followings to prevent the occurrence similar troubles in Japan: Operators should be thoroughly skilled in basic actions to prevent human errors as persons concerned. And it should be further emphasized that they should elaborate by imaging actual plant operations even though the simulator training gives them successful experiences. (author)

  8. The Operational Preparedness of United States Air Force Certified Registered Nurse Anesthetists to Provide Trauma Anesthesia

    National Research Council Canada - National Science Library

    Frank, Michael W

    1999-01-01

    .... The purpose of this study was to determine the experience and training in trauma anesthesia of CRNAs in the United States Air Force, as well as their perceived value of this experience and training...

  9. Analysis of operational factors that can lead to fuel failure in WWER units

    International Nuclear Information System (INIS)

    Evdokimov, I.A.; Likhanskij, V.V.; Sorokin, A.A.; Zborovskij, V.G.; Kozhakin, A.N.; Chernetskij, M.G.; Shestakov, Yu.M.; Semenovykh, A.S.

    2014-01-01

    The present paper is focused on fuel failure in WWER units in the period of 2003 through 2013. The data of visual inspections and post-irradiation examinations of leaking fuel assemblies in hot cells are reported [ru

  10. Turkey Point Plant, Units 3 and 4. Semiannual operating report No. 6, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated by Unit 3 was 2,676,523 MWH(e) with the plant on line 4,148.8 hrs. Unit 4 generated 1,429,108 MWH(e) and was on line 2,232.0 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental radiation monitoring. (FS)

  11. Final environmental statement related to the operation of Millstone Nuclear Power Station, Unit No. 3 (Docket No. 50-423)

    International Nuclear Information System (INIS)

    1984-12-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of Millstone Nuclear Power Station, Unit 3, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeologic sites will be small. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial. On the basis of the analysis and evaluation set forth in this environmental statement, it is concluded that the action called for under NEPA and 10 CFR 51 is the issuance of an operating license for Millstone Nuclear Power Station, Unit 3. 101 references, 33 figures, 30 tables

  12. Toeplitz and Hankel operators and Dixmier trances on the unit ball of C-n

    Czech Academy of Sciences Publication Activity Database

    Engliš, Miroslav; Guo, K.; Zhang, G.

    2009-01-01

    Roč. 137, č. 11 (2009), s. 3669-3678 ISSN 0002-9939 R&D Projects: GA ČR(CZ) GA201/06/0128 Institutional research plan: CEZ:AV0Z10190503 Keywords : Schatten- von Neumann classes * Macaev classes * trace * Dixmier trace * Toeplitz operators * Hankel operators Subject RIV: BA - General Mathematics Impact factor: 0.640, year: 2009

  13. The Quality of Operative Notes at a General Surgery Unit | Rogers ...

    African Journals Online (AJOL)

    practice, accurate documentation is critical. This is particularly true for operative procedures, and medical councils have identified this and published guidelines to aid surgeons. However, these remain a frequently cited weakness in their defence in medico-legal cases. This study assessed the accuracy of operative notes in ...

  14. History of Operations Research in the United States Army, Volume 1: 1942-1962

    Science.gov (United States)

    2006-11-08

    Division also undertook operational sim- ulations of various air defense missiles, such as the Nike , Talos, and Hawk systems.349 Th e Strategy and...of ORO Work Program,” pp. 10, 13, Figure 12. 64As early as 1953, the advertisements for ORO employment in Th e Journal of the Operations Research

  15. The Agency's technical co-operation programme with the United Arab Emirates 1984-1994 country programme summaries

    International Nuclear Information System (INIS)

    1994-01-01

    This report contains a review of the Agency's technical co-operation activities in the United Arab Emirates carried out during 1984-1994. In terms of coverage and analytical depth, country programmes summaries stand somewhere midway between in-depth country programme evaluations and individual project evaluations. They attempt to provide a comprehensive, descriptive picture of the Agency's co-operation with a Member State in a manner that will be particularly useful for programming decisions. The attempt is very much to describe - largely through statistical data - not to provide independent analysis and evaluation

  16. Safety Evaluation Report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1985-10-01

    This Safety Evaluation Report on the application filed by Duquesne Light Company, as applicant and agent for the owners, for a license to operate the Beaver Valley Power Station Unit 2 (Docket No. 50-412) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Shippingport Borough, Beaver County, Pennsylvania, on the south bank of the Ohio River. Subject to the favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  17. Design and operational considerations of United States commercial nea-surface low-level radioactive waste disposal facilities

    International Nuclear Information System (INIS)

    Birk, Sandra M.

    1997-01-01

    Low-level radioactive waste disposal standards and techniques in the United States have evolved significantly since the early 1960's. Six commercial LLW disposal facilities(Barnwell, Richland, Ward Valley, Sierra Blanca, Wake County and Boyd County) operated and proposed between 1962 and 1997. This report summarizes each site's design and operational considerations for near-surface disposal of low-level radioactive waste. These new standards and mitigating efforts at closed facilities (Sheffield, Maxey Flats, Beatty and West Valley) have helped to ensure that the public has been safely protected from LLW. 15 refs

  18. Safety evaluation report related to the operation of Millstone Nuclear Power Station, Unit No. 3 (Docket No. 50-423)

    International Nuclear Information System (INIS)

    1984-07-01

    The Safety Evaluation Report for the application filed by Northeast Nuclear Energy Company, as applicant and agent for the owners, for a license to operate the Millstone Nuclear Power Station Unit 3 (Docket No. 50-423), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in the town of Waterford, New London County, Connecticut, on the north shore of Long Island Sound. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  19. Inverse spectral results for Schroedinger operators on the unit interval with partial information given on the potentials

    International Nuclear Information System (INIS)

    Amour, L.; Raoux, T.; Faupin, J.

    2009-01-01

    We pursue the analysis of the Schroedinger operator on the unit interval in inverse spectral theory initiated in the work of Amour and Raoux [''Inverse spectral results for Schroedinger operators on the unit interval with potentials in Lp spaces,'' Inverse Probl. 23, 2367 (2007)]. While the potentials in the work of Amour and Raoux belong to L 1 with their difference in L p (1≤p k,1 spaces having their difference in W k,p , where 1≤p≤+∞, k(set-membership sign)(0,1,2). It is proved that two potentials in W k,1 ([0,1]) being equal on [a,1] are also equal on [0,1] if their difference belongs to W k,p ([0,a]) and if the number of their common eigenvalues is sufficiently high. Naturally, this number decreases as the parameter a decreases and as the parameters k and p increase

  20. Inverse spectral results for Schrödinger operators on the unit interval with partial information given on the potentials

    Science.gov (United States)

    Amour, L.; Faupin, J.; Raoux, T.

    2009-03-01

    We pursue the analysis of the Schrödinger operator on the unit interval in inverse spectral theory initiated in the work of Amour and Raoux ["Inverse spectral results for Schrödinger operators on the unit interval with potentials in Lp spaces," Inverse Probl. 23, 2367 (2007)]. While the potentials in the work of Amour and Raoux belong to L1 with their difference in Lp (1≤p<∞), we consider here potentials in Wk,1 spaces having their difference in Wk,p, where 1≤p≤+∞, k ɛ{0,1,2}. It is proved that two potentials in Wk,1([0,1]) being equal on [a,1] are also equal on [0,1] if their difference belongs to Wk,p([0,a]) and if the number of their common eigenvalues is sufficiently high. Naturally, this number decreases as the parameter a decreases and as the parameters k and p increase.

  1. Baseline risk assessment for the quarry residuals operable unit of the Weldon Spring Site, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1998-02-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. Cleanup of the site consists of several integrated components. The quarry residuals operable unit (QROU), consisting of the Weldon Spring quarry and its surrounding area, is one of four operable units being evaluated. In accordance with requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE is conducting a remedial investigation/feasibility study (RI/FS) to determine the proper response to address various contaminated media that constitute the QROU. Specifically, the operable unit consists of the following areas and media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and the bulk waste; groundwater underlying the quarry and surrounding area; and other media located in the surrounding vicinity of the quarry, including surface water and sediment at Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek. An initial evaluation of conditions at the quarry area identified remaining data requirements needed to support the conceptual site exposure and hydrogeological models. These data requirements are discussed in the RI/FS work plan issued in January 1994. Soil contamination located at a property adjacent to the quarry, referred to as Vicinity Property 9 (VP9), was originally part of the scope of the QROU, as discussed in the work plan. However, a decision was subsequently made to remediate this vicinity property as part of cleanup activities for the chemical plant operable unit, as provided for in the Record of Decision (ROD). Remediation of VP9 was completed in early 1996. Hence, this baseline risk assessment (BRA) does not address VP9

  2. Potential effects of forestry operations and associated best management practices on riparian wildlife species in the southeastern United States

    Science.gov (United States)

    Brooke M. Warrington; W. Michael Aust; Scott M. Barrett; W. Mark Ford; M. Chad Bolding; Andy Dolloff

    2016-01-01

    The US Fish and Wildlife Service is considering the addition of 374 riparian and aquatic species in the southeastern United States to the federal Threated and Endangered Species List. This recommendation is a result of a 2011 petition, which recognized forest operations as having negative effects on 51 percent of the listed species, citing research conducted in the...

  3. Baseline risk assessment for the quarry residuals operable unit of the Weldon Spring Site, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. Cleanup of the site consists of several integrated components. The quarry residuals operable unit (QROU), consisting of the Weldon Spring quarry and its surrounding area, is one of four operable units being evaluated. In accordance with requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE is conducting a remedial investigation/feasibility study (RI/FS) to determine the proper response to address various contaminated media that constitute the QROU. Specifically, the operable unit consists of the following areas and media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and the bulk waste; groundwater underlying the quarry and surrounding area; and other media located in the surrounding vicinity of the quarry, including surface water and sediment at Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek. An initial evaluation of conditions at the quarry area identified remaining data requirements needed to support the conceptual site exposure and hydrogeological models. These data requirements are discussed in the RI/FS work plan issued in January 1994. Soil contamination located at a property adjacent to the quarry, referred to as Vicinity Property 9 (VP9), was originally part of the scope of the QROU, as discussed in the work plan. However, a decision was subsequently made to remediate this vicinity property as part of cleanup activities for the chemical plant operable unit, as provided for in the Record of Decision (ROD). Remediation of VP9 was completed in early 1996. Hence, this baseline risk assessment (BRA) does not address VP9.

  4. Draft environmental statement related to the operation of Millstone Nuclear Power Station, Unit No. 3 (Docket No. 50-423)

    International Nuclear Information System (INIS)

    1984-07-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of Millstone Nuclear Power Station, Unit 3, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs

  5. Safety Evaluation Report related to the operation of Shoreham Nuclear Power Station, Unit No. 1 (Docket No. 50-322)

    International Nuclear Information System (INIS)

    1989-04-01

    Supplement 10 (SSER 10) to the Safety Evaluation Report on Long Island Lighting Company's application for a license to operate the Shoreham Nuclear Power Station, Unit 1, located in Suffolk County, New York, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement addresses several items that have been reviewed by the staff since the previous supplement was issued

  6. Safety evaluation report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1986-05-01

    This report, Supplement No. 1 to the Safety Evaluation Report for the application filed by the Duquesne Light Company et al. (the applicant) for a license to operate the Beaver valley Power Station, Unit 2 (Docket No. 50-412), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time the Safety Evaluation Report was published

  7. Safety evaluation report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1987-03-01

    This report, Supplement No. 4 to the Safety Evaluation Report for the application filed by the Duquesne Light Company et al. (the applicant) for a license to operate the Beaver Valley Power Station, Unit 2 (Docket No. 50-412), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved when the Safety Evaluation Report and its Supplements 1, 2, and 3 were published

  8. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Unit 2 (Docket No. 50-446)

    International Nuclear Information System (INIS)

    1993-02-01

    Supplement 26 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Unit 2, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, 21, 22, 23, 24, and 25 to that report were published. This supplement deals primarily with Unit 2 issues; however, it also references evaluations for several licensing issues that relate to Unit 1, which have been resolved since Supplement 25 was issued

  9. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Unit 2 (Docket No. 50-446)

    International Nuclear Information System (INIS)

    1992-09-01

    This document supplement 25 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Unit 2 (NUREG-0797), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, 21, 22, 23, and 24 to that report were published. This supplement deals primarily with Unit 2 issues; however, it also references evaluations for several Unit 1 licensing items resolved since Supplement 24 was issued

  10. Operating power plant experience with condensate polishing units in morpholine/ammonia-OH cycle

    International Nuclear Information System (INIS)

    Kumbhar, A.G.; Padmakumari, T.V.; Narasimhan, S.V.; Mathur, P.K.

    1995-01-01

    Impurity removal efficiency of condensate polisher plant (CPP) in ammonium cycle is poor. Cost considerations demand CPP operation in amine-OH cycle. With certain precautions such as higher regeneration levels, good regenerent quality, minimized cross contamination, continuous monitoring of influent and effluent and provision for 100% standby bed, it is possible to operate CPP beyond H-OH cycle while keeping the effluent impurities within the specified limits. This paper presents problem associated with the Madras Atomic Power Station (MAPS) CPP operation in morpholine-OH form and Korba Super Thermal Power Station (KSTPS) CPP in ammonia-OH form and suggested remedial measures. (author). 3 refs., 1 fig

  11. Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-09-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime's, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives

  12. Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives.

  13. Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

  14. Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-07-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives

  15. EnviroAtlas - Acres of USDA Farm Service Agency Conservation Reserve Program land by 12-Digit HUC for the Conterminous United States.

    Data.gov (United States)

    U.S. Environmental Protection Agency — This EnviroAtlas dataset shows the acres of land enrolled in the US Department of Agriculture (USDA)'s Conservation Reserve Program (CRP). The CRP is administered by...

  16. Surface radiation survey and soil sampling of the 300-FF-1 operable unit, Hanford Site, southeastern Washington: A case study

    International Nuclear Information System (INIS)

    Teel, S.S.; Olsen, K.B.

    1990-10-01

    The methods used for conducting a radiological characterization of the soil surface for the Phase I Remedial Investigation of a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site is presented via a case study. The study site is an operable unit (300-FF-1) located in and adjacent to the 300 Area of the US Department of Energy's Hanford Site in southeastern Washington State. The operable unit contains liquid and solid waste disposal facilities associated with nuclear fuels fabrication. Continuous surface radiation surveying and soil sampling of selected locations were conducted. Contamination was found in several locations within the operable unit including areas near the liquid and solid waste disposal facilities. Instruments used during surveying included portable beta/gamma (P-11) detectors, and the Ultrasonic Ranging and Data System using an NaI (Tl) detector. Laboratory analyses results indicate that above-background radiation levels were primarily due to the presence of uranium. Both types of field instruments used in the study were effective in detecting surface contamination from radionuclides; however, each had specific advantages. Guidelines are presented for the optimum use of these instruments when performing a radiological characterization of the soil surface. 4 refs., 3 figs., 3 tabs

  17. Mass and number size distributions of emitted particulates at five important operation units in a hazardous industrial waste incineration plant.

    Science.gov (United States)

    Lin, Chi-Chi; Huang, Hsiao-Lin; Hsiao, Wen-Yuan

    2016-01-01

    Past studies indicated particulates generated by waste incineration contain various hazardous compounds. The aerosol characteristics are very important for particulate hazard control and workers' protection. This study explores the detailed characteristics of emitted particulates from each important operation unit in a rotary kiln-based hazardous industrial waste incineration plant. A dust size analyzer (Grimm 1.109) and a scanning mobility particle sizer (SMPS) were used to measure the aerosol mass concentration, mass size distribution, and number size distribution at five operation units (S1-S5) during periods of normal operation, furnace shutdown, and annual maintenance. The place with the highest measured PM10 concentration was located at the area of fly ash discharge from air pollution control equipment (S5) during the period of normal operation. Fine particles (PM2.5) constituted the majority of the emitted particles from the incineration plant. The mass size distributions (elucidated) made it clear that the size of aerosols caused by the increased particulate mass, resulting from work activities, were mostly greater than 1.5 μm. Whereas the number size distributions showed that the major diameters of particulates that caused the increase of particulate number concentrations, from work activities, were distributed in the sub micrometer range. The process of discharging fly ash from air pollution control equipment can significantly increase the emission of nanoparticles. The mass concentrations and size distributions of emitted particulates were different at each operation unit. This information is valuable for managers to take appropriate strategy to reduce the particulate emission and associated worker exposure.

  18. The Operational Preparedness of United States Air Force Certified Registered Nurse Anesthetists to Provide Trauma Anesthesia

    National Research Council Canada - National Science Library

    Frank, Michael W

    1999-01-01

    ...) must expand their role while deployed and be skilled in the management of trauma. Treating traumatically injured patients in Air Force hospitals is limited while working outside of the operational theater...

  19. United States Special Operations Command Strategic Issues for the Long War

    National Research Council Canada - National Science Library

    Wiley, Joseph T

    2006-01-01

    ...) as the supported combatant command in the Global War on Terrorism. However the scope of the national strategy is vastly beyond simply implementing a campaign plan for Special Operations Forces (SOF...

  20. Agent-Based Simulation of German Peacekeeping Operations for Units up to Platoon Level

    National Research Council Canada - National Science Library

    Erlenbruch, Thomas

    2002-01-01

    A significant challenge to the German Military Forces or "Bundeswehr" today is the development of tactics that will enable soldiers airmen and sailors to be successful in small-scale peacekeeping operations...