  1. European commission research activities on iodine

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, E della [European Commission, Brussels (Belgium)

    1996-12-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs.

  2. European commission research activities on iodine

    International Nuclear Information System (INIS)

    Loggia, E. della

    1996-01-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs

  3. Evaluation of a 'virtual' approach to commissioning health research.

    Science.gov (United States)

    McCourt, Christine A; Morgan, Philip A; Youll, Penny

    2006-10-18

    The objective of this study was to evaluate the implementation of a 'virtual' (computer-mediated) approach to health research commissioning. This had been introduced experimentally in a DOH programme--the 'Health of Londoners Programme'--in order to assess whether is could enhance the accessibility, transparency and effectiveness of commissioning health research. The study described here was commissioned to evaluate this novel approach, addressing these key questions. A naturalistic-experimental approach was combined with principles of action research. The different commissioning groups within the programme were randomly allocated to either the traditional face-to-face mode or the novel 'virtual' mode. Mainly qualitative data were gathered including observation of all (virtual and face-to-face) commissioning meetings; semi-structured interviews with a purposive sample of participants (n = 32/66); structured questionnaires and interviews with lead researchers of early commissioned projects. All members of the commissioning groups were invited to participate in collaborative enquiry groups which participated actively in the analysis process. The virtual process functioned as intended, reaching timely and relatively transparent decisions that participants had confidence in. Despite the potential for greater access using a virtual approach, few differences were found in practice. Key advantages included physical access, a more flexible and extended time period for discussion, reflection and information gathering and a more transparent decision-making process. Key challenges were the reduction of social cues available in a computer-mediated medium that require novel ways of ensuring appropriate dialogue, feedback and interaction. However, in both modes, the process was influenced by a range of factors and was not technology driven. There is potential for using computer-mediated communication within the research commissioning process. This may enhance access

  4. Evaluation of a 'virtual' approach to commissioning health research

    Directory of Open Access Journals (Sweden)

    Morgan Philip A

    2006-10-01

    Full Text Available Abstract Background The objective of this study was to evaluate the implementation of a 'virtual' (computer-mediated approach to health research commissioning. This had been introduced experimentally in a DOH programme – the 'Health of Londoners Programme' – in order to assess whether is could enhance the accessibility, transparency and effectiveness of commissioning health research. The study described here was commissioned to evaluate this novel approach, addressing these key questions. Methods A naturalistic-experimental approach was combined with principles of action research. The different commissioning groups within the programme were randomly allocated to either the traditional face-to-face mode or the novel 'virtual' mode. Mainly qualitative data were gathered including observation of all (virtual and face-to-face commissioning meetings; semi-structured interviews with a purposive sample of participants (n = 32/66; structured questionnaires and interviews with lead researchers of early commissioned projects. All members of the commissioning groups were invited to participate in collaborative enquiry groups which participated actively in the analysis process. Results The virtual process functioned as intended, reaching timely and relatively transparent decisions that participants had confidence in. Despite the potential for greater access using a virtual approach, few differences were found in practice. Key advantages included physical access, a more flexible and extended time period for discussion, reflection and information gathering and a more transparent decision-making process. Key challenges were the reduction of social cues available in a computer-mediated medium that require novel ways of ensuring appropriate dialogue, feedback and interaction. However, in both modes, the process was influenced by a range of factors and was not technology driven. Conclusion There is potential for using computer-mediated communication within

  5. Commissioning of research reactors. Safety guide

    International Nuclear Information System (INIS)

    2006-01-01

    The objective of this Safety Guide is to provide recommendations on meeting the requirements for the commissioning of research reactors on the basis of international best practices. Specifically, it provides recommendations on fulfilling the requirements established in paras 6.44 and 7.42-7.50 of International Atomic Energy Agency, Safety of Research Reactors, IAEA Safety Standards Series No. NS-R-4, IAEA, Vienna (2005) and guidance and specific and consequential recommendations relating to the recommendations presented in paras 615-621 of International Atomic Energy Agency, Safety in the Utilization and Modification of Research Reactors, Safety Series No. 35-G2, IAEA, Vienna (1994) and paras 228-229 of International Atomic Energy Agency, Safety Assessment of Research Reactors and Preparation of the Safety Analysis Report, Safety Series No. 35-G1, IAEA, Vienna (1994). This Safety Guide is intended for use by all organizations involved in commissioning for a research reactor, including the operating organization, the regulatory body and other organizations involved in the research reactor project

  6. Swiss Federal Energy Research Commission - Annual report 2009

    International Nuclear Information System (INIS)

    Maus, K.

    2010-02-01

    This annual report for the Swiss Federal Office of Energy (SFOE) provides an overview of the work carried out by the Swiss Federal Energy Research Commission CORE in 2009. The commission's main work included preparation work for the revised energy research concept for the period 2013 - 2016, a review of all research programmes operated by the Swiss Federal Office of Energy SFOE, the enhancement of cooperation with public and private research and promotion institutions, the coordination and consultation of research institutions and the improvement of international information exchange. The report summarises coordination work with the many CORE programmes and defines strategic main areas of interest for future work

  7. Nuclear safety research at the European Commission's Joint Research Centre

    International Nuclear Information System (INIS)

    Toerroenen, K.

    2003-01-01

    Nuclear power plants currently generate some 35 % of electricity used in the European Union and applicant countries. Nuclear safety will therefore remain a priority for the EU, particularly in view of enlargement, the need to monitor ageing nuclear installations and the licencing of advanced new reactor systems. The European Commission's Joint Research Centre (JRC), with its long involvement and recognised competence in nuclear safety related activities, provides direct support to the European Commission services responsible for nuclear safety and civil protection. (author)

  8. National evaluation commission relative to the researches on the radioactive wastes management

    International Nuclear Information System (INIS)

    2004-01-01

    Implemented in april 1994, the National Evaluation Commission (CNE) continues in this tenth report, its study on the radioactive wastes management following the three axis defined by the 1991 law: separation and transmutation, underground disposal, conditioning and log time storage. This report takes stock on the CNE activity in 2003 as on the researches advances around these three axis. In the framework of the international cooperation, the commission details also the researches and realizations abroad. (A.L.B.)

  9. Asking the right questions: Scoping studies in the commissioning of research on the organisation and delivery of health services

    Directory of Open Access Journals (Sweden)

    Peckham Stephen

    2008-07-01

    Full Text Available Abstract Scoping studies have been used across a range of disciplines for a wide variety of purposes. However, their value is increasingly limited by a lack of definition and clarity of purpose. The UK's Service Delivery and Organisation Research Programme (SDO has extensive experience of commissioning and using such studies; twenty four have now been completed. This review article has four objectives; to describe the nature of the scoping studies that have been commissioned by the SDO Programme; to consider the impact of and uses made of such studies; to provide definitions for the different elements that may constitute a scoping study; and to describe the lessons learnt by the SDO Programme in commissioning scoping studies. Scoping studies are imprecisely defined but usually consist of one or more discrete components; most commonly they are non-systematic reviews of the literature, but other important elements are literature mapping, conceptual mapping and policy mapping. Some scoping studies also involve consultations with stakeholders including the end users of research. Scoping studies have been used for a wide variety of purposes, although a common feature is to identify questions and topics for future research. The reports of scoping studies often have an impact that extends beyond informing research commissioners about future research areas; some have been published in peer reviewed journals, and others have been published in research summaries aimed at a broader audience of health service managers and policymakers. Key lessons from the SDO experience are the need to relate scoping studies to a particular health service context; the need for scoping teams to be multi-disciplinary and to be given enough time to integrate diverse findings; and the need for the research commissioners to be explicit not only about the aims of scoping studies but also about their intended uses. This necessitates regular contact between researchers and

  10. National evaluation commission relative to the researches on the radioactive wastes management; Commission nationale d'evaluation relative aux recherches sur la gestion des dechets radioactifs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    Implemented in april 1994, the National Evaluation Commission (CNE) continues in this tenth report, its study on the radioactive wastes management following the three axis defined by the 1991 law: separation and transmutation, underground disposal, conditioning and log time storage. This report takes stock on the CNE activity in 2003 as on the researches advances around these three axis. In the framework of the international cooperation, the commission details also the researches and realizations abroad. (A.L.B.)

  11. Beam commissioning of the 3-GeV rapid cycling synchrotron of the Japan Proton Accelerator Research Complex

    Directory of Open Access Journals (Sweden)

    H. Hotchi

    2009-04-01

    Full Text Available The 3-GeV rapid cycling synchrotron (RCS of the Japan Proton Accelerator Research Complex (J-PARC was commissioned in October 2007, and successfully accomplished 3 GeV acceleration on October 31. Six run cycles through February 2008 were dedicated to commissioning the RCS, for which the initial machine parameter tuning and various underlying beam studies were completed. Then since May 2008 the RCS beam has been delivered to the downstream facilities for their beam commissioning. In this paper we describe beam tuning and study results following our beam commissioning scenario and a beam performance and operational experience obtained in the first commissioning phase through June 2008.

  12. U.S. Nuclear Regulatory Commission natural analogue research program

    International Nuclear Information System (INIS)

    Kovach, L.A.; Ott, W.R.

    1995-01-01

    This article describes the natural analogue research program of the U.S. Nuclear Regulatory Commission (US NRC). It contains information on the regulatory context and organizational structure of the high-level radioactive waste research program plan. It also includes information on the conditions and processes constraining selection of natural analogues, describes initiatives of the US NRC, and describes the role of analogues in the licensing process

  13. Views of NHS commissioners on commissioning support provision. Evidence from a qualitative study examining the early development of clinical commissioning groups in England.

    Science.gov (United States)

    Petsoulas, Christina; Allen, Pauline; Checkland, Kath; Coleman, Anna; Segar, Julia; Peckham, Stephen; Mcdermott, Imelda

    2014-10-15

    The 2010 healthcare reform in England introduced primary care-led commissioning in the National Health Service (NHS) by establishing clinical commissioning groups (CCGs). A key factor for the success of the reform is the provision of excellent commissioning support services to CCGs. The Government's aim is to create a vibrant market of competing providers of such services (from both for-profit and not-for-profit sectors). Until this market develops, however, commissioning support units (CSUs) have been created from which CCGs are buying commissioning support functions. This study explored the attitudes of CCGs towards outsourcing commissioning support functions during the initial stage of the reform. The research took place between September 2011 and June 2012. We used a case study research design in eight CCGs, conducting in-depth interviews, observation of meetings and analysis of policy documents. We conducted 96 interviews and observed 146 meetings (a total of approximately 439 h). Many CCGs were reluctant to outsource core commissioning support functions (such as contracting) for fear of losing local knowledge and trusted relationships. Others were disappointed by the absence of choice and saw CSUs as monopolies and a recreation of the abolished PCTs. Many expressed doubts about the expectation that outsourcing of commissioning support functions will result in lower administrative costs. Given the nature of healthcare commissioning, outsourcing vital commissioning support functions may not be the preferred option of CCGs. Considerations of high transaction costs, and the risk of fragmentation of services and loss of trusted relationships involved in short-term contracting, may lead most CCGs to decide to form long-term partnerships with commissioning support suppliers in the future. This option, however, limits competition by creating 'network closure' and calls into question the Government's intention to create a vibrant market of commissioning support

  14. National Nuclear Research Institute, Ghana Atomic Energy Commission: Annual Report 2014

    International Nuclear Information System (INIS)

    2014-01-01

    This annual report covers the research and commercial activities of the National Nuclear Research Institute of the Ghana Atomic Energy Commission for the year 2014. Also listed are the scientific and technical publications issued by staff.

  15. Bioethics commission to review gene patenting

    Energy Technology Data Exchange (ETDEWEB)

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  16. The Commission's research action programme on the development of nuclear fission energy

    International Nuclear Information System (INIS)

    1984-01-01

    For its 'Framework Programme 1984-1987' the Commission has defined the major goals for a European Scientific and Technical Strategy. One of the means to reduce the energy dependence of the Community, which is an important objective, is to favour the development of nuclear fission energy. As electricity production by nuclear reactors has reached industrial maturity, the Community activities are directed mainly to safety aspects, in order to ensure the protection of workers and the general public, against hazards linked to operations in the nuclear fuel cycle. A description of the main features of the five sub-programmes on nuclear fission energy is given below; these programmes are: reactor safety; nuclear fuels and actinides research; management of radioactive waste; safeguarding and management of fissile materials; decommissioning of nuclear installations. The research and development work is carried out either by the Commission's Joint Research Center or by organizations and companies of the Member Countries, with the Commission's financial support. (author)

  17. Analogue studies at the french atomic commission (CEA)

    International Nuclear Information System (INIS)

    Petit, J.C.

    1986-06-01

    The different research activities of the French Atomic Energy Commission in the analogue study field are presented. Most of them are conducted in collaboration with major research organisations, both french and international. In fact, the scientific community has been associated to these programmes at different steps of their realisation. The brief description presented illustrates the great diversity and complementarity of actions conducted by CEA for better understanding, through the study of natural analogues, the basic processes that will rule the long term behaviour of high level radwaste materials in a repository and hence contributing to hopefully guaranty disposal safety

  18. Monitoring and analysis of technology transfer and intellectual property regimes and their use results of a study carried out on behalf of the European Commission (DG Research)

    CERN Document Server

    Van Eecke, Patrick; Bolger, P; Truyens, M

    2008-01-01

    This report presents the results of a three-year study commissioned by the European Commission (DG Research) regarding the monitoring, analysis and use of technology transfer and intellectual property regimes in the European Union. This study was organised in the context of the 6th Framework Programme for R&D, and was jointly carried out by law firms Mason Hayes+Curran (Dublin) and DLA Piper (Brussels).

  19. 77 FR 9273 - WORKSHOP Sponsored by the Nuclear Regulatory Commission and the Electric Power Research Institute...

    Science.gov (United States)

    2012-02-16

    ... Commission and the Electric Power Research Institute on the Treatment of Probabilistic Risk Assessment.... SUMMARY: The U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Regulatory Research (RES), in cooperation with the Electric Power Research Institute (EPRI), will hold a joint workshop on the Treatment of...

  20. A Study on the Efficient Operating Management of Atomic Energy Commission

    International Nuclear Information System (INIS)

    Yun, Sungwon; Chung, W. S.; Lee, D. S.; Park, S. J.

    2013-04-01

    This study aimed to provide professionals in humanities and social sciences, not only nuclear, with a place for communication by establishing a website of Atomic Energy Commission and people with a place for participation which help the nuclear policy reflect public opinions. By establishing the website of Atomic Energy Commission, experts (including those in humanities and social sciences) can suggest policy agenda and public opinions can be suggested through the place for public participation. Also the website should restrict on indiscreet search by separating sections only for experts and provide experts with a section for active and creative debate on nuclear policy. All the accessible meeting agenda and minutes have been chronologically organized and the findings of the committee have been announced to share with people concerning nuclear policy. In terms of the effective operation of Atomic Energy Commission, research has been conducted for standing committee, regular meeting, activating the commission through system change and expert committee in addition to support for the 2nd meeting of Atomic Energy Committee and the 31st Nuclear Expert Committee. Activation measures to improve the operating system of the commission is proposed as following; changing of the commission's chairman operating system, standing commission regular meeting, activation of subcommittee and expanding and diversifying of agenda

  1. The U.S. Nuclear Regulatory Commission seismic safety research program

    International Nuclear Information System (INIS)

    Kenneally, R.M.; Guzy, D.J.; Murphy, A.J.

    1988-01-01

    The seismic safety research program sponsored by the U.S. Nuclear Regulatory Commission is directed toward improving the evaluation of potential earthquake effects on nuclear power plant operations. The research has been divided into three major program areas: earth sciences, seismic design margins, and fragilities and response. A major thrust of this research is to assess plant behavior for seismic events more severe and less probable than those considered in design. However, there is also research aimed at improving the evaluation of earthquake input and plant response at plant design levels

  2. Radiation protection commissioning of neutron beam instruments at the OPAL research reactor

    International Nuclear Information System (INIS)

    Parkes, Alison; Saratsopoulos, John; Deura, Michael; Kenny, Pat

    2008-01-01

    The neutron beam facilities at the 20 MW OPAL Research Reactor were commissioned in 2007 and 2008. The initial suite of eight neutron beam instruments on two thermal neutron guides, two cold neutron guides and one thermal beam port located at the reactor face, together with their associated shielding were progressively installed and commissioned according to their individual project plans. Radiation surveys were systematically conducted as reactor power was raised in a step-wise manner to 20 MW in order to validate instrument shielding design and performance. The performance of each neutron guide was assessed by neutron energy spectrum and flux measurements. The activation of beam line components, decay times assessments and access procedures for Bragg Institute beam instrument scientists were established. The multiple configurations for each instrument and the influence of operating more than one instrument or beamline simultaneously were also tested. Areas of interest were the shielding around the secondary shutters, guide shield and bunker shield interfaces and monochromator doors. The shielding performance, safety interlock checks, improvements, radiation exposures and related radiation protection challenges are discussed. This paper discusses the health physics experience of commissioning the OPAL Research Reactor neutron beam facilities and describes health physics results, actions taken and lessons learned during commissioning. (author)

  3. Swiss Federal Energy Research Commission - Annual report 2008

    International Nuclear Information System (INIS)

    Maus, K.

    2009-01-01

    This annual report presents a review of the activities carried out by the Swiss Federal Energy Research Commission CORE in the year 2008. Main points of interest were the definition of a new CORE vision, a review of all research programmes, co-operation and co-ordination with public and private institutes, active consultancy, recommendations for further education and training, improved international information exchange and good communication with business, politics and the general public. The definition of a concept for Swiss energy research for the period 2012 to 2016 is mentioned. The annual report also reports on an internal visit made to various laboratories of the Swiss Federal Institute of Technology in Lausanne and the Energy Center in Zurich. The focussing of CORE activities on particular themes is discussed

  4. Geothermal research and development program of the US Atomic Energy Commission

    Science.gov (United States)

    Werner, L. B.

    1974-01-01

    Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

  5. Leadership of healthcare commissioning networks in England: a mixed-methods study on clinical commissioning groups

    Science.gov (United States)

    Zachariadis, Markos; Oborn, Eivor; Barrett, Michael; Zollinger-Read, Paul

    2013-01-01

    Objective To explore the relational challenges for general practitioner (GP) leaders setting up new network-centric commissioning organisations in the recent health policy reform in England, we use innovation network theory to identify key network leadership practices that facilitate healthcare innovation. Design Mixed-method, multisite and case study research. Setting Six clinical commissioning groups and local clusters in the East of England area, covering in total 208 GPs and 1 662 000 population. Methods Semistructured interviews with 56 lead GPs, practice managers and staff from the local health authorities (primary care trusts, PCT) as well as various healthcare professionals; 21 observations of clinical commissioning group (CCG) board and executive meetings; electronic survey of 58 CCG board members (these included GPs, practice managers, PCT employees, nurses and patient representatives) and subsequent social network analysis. Main outcome measures Collaborative relationships between CCG board members and stakeholders from their healthcare network; clarifying the role of GPs as network leaders; strengths and areas for development of CCGs. Results Drawing upon innovation network theory provides unique insights of the CCG leaders’ activities in establishing best practices and introducing new clinical pathways. In this context we identified three network leadership roles: managing knowledge flows, managing network coherence and managing network stability. Knowledge sharing and effective collaboration among GPs enable network stability and the alignment of CCG objectives with those of the wider health system (network coherence). Even though activities varied between commissioning groups, collaborative initiatives were common. However, there was significant variation among CCGs around the level of engagement with providers, patients and local authorities. Locality (sub) groups played an important role because they linked commissioning decisions with

  6. Ethical evaluation of research proposals by ethics panels advising the European Commission.

    Science.gov (United States)

    Kolar, Roman

    2004-06-01

    Ethical principles with regard to animal experimentation are referred to in European Union (EU) legislation and other official documents. Therefore, applications for funding of research under the EU's research programme may undergo an ethical review that is carried out by so-called ethics panels, consisting of experts chosen by the European Commission. The work of these panels differs substantially from that of other ethical committees, as they exist on the institutional, local, regional or national level. Their main purpose is not to decide whether a proposed research can be regarded legal, and therefore should be endorsed or licensed; instead, it is to help the Commission in prioritising its funding. The panels may examine other ethical aspects than those of animal experimentation or animal welfare alone, such as the use of human volunteers. This is reflected by the composition of the panels. Their decisions are normally based on consensus. Even though these decisions may refer to EU legislation, the criteria applied are not restricted to those provided by this legislation. Nevertheless, the various aspects of the Commission's ethical evaluation system (e.g. formal and practical basic conditions, information content of applications, type of decisions taken, lacking of any quality control) offers opportunities for improvement.

  7. Findings by the Commission Evaluating Nuclear Safety and Repository Research in Germany

    International Nuclear Information System (INIS)

    Sandtner, W.; Closs, K.D.

    2000-01-01

    The Commission Evaluating Nuclear Safety and Repository Research in Germany, which had been appointed by the German Federal Ministry of Economics on September 24, 1999, submitted its report. Here is the gist of the Commission's findings: Irrespective of the criteria established with the political decision to terminate the use of nuclear power in Germany, competence in nuclear safety must be maintained over the next few decades. Only in this way can the government perform its duty and make provisions for the future, and can the safety of nuclear facilities and waste management pathways be ensured in accordance with the international state of the art. In view of the considerable reduction in funding in recent years and also in future, measures must be taken to ensure that further decreases in-roject funding and institutionalized government financing are excluded so as to avoid further declines in terms of manpower and competence in this field. Reactor safety and repository research must be financed at a level allowing the federal government to discharge its legal duties. The full report by the Commission, with its annexes, is available on the GRS web site (http://www.grs.de) as a PDF file. (orig.) [de

  8. International radiation commissions 1896 to 2008. Research into atmospheric radiation from IMO to IAMAS

    International Nuclear Information System (INIS)

    Bolle, H.J.; Moeller, F.; London, J.

    2008-01-01

    The document covers a historical compilation on research into atmospheric radiation from 1896 to 2008. The first part is a brief history of the radiation commissions of IMO (International Meteorological Organization) and IUGG (International Union of Geodesy and Geophysics) for the period 1824 to 1948. Part 2 Covers the International Radiation Commission (IRC) of IAM (International Association of Meteorology)/IAMAS (International Association of Meteorology and Atmospheric Sciences)/IAMAP (International Association of Meteorology and Atmospheric Physics); the Re-constitution of the IUGG Radiation Commision, the Officers of the International Radiation Commission of IUUG 1948-2008, and the activities of the Radiation Commision of the IUGG 1948-2008. The appendices include the Radiation Commission Members, the summaries of presented papers from 1954 and 1957, the IRC publications, and acronyms

  9. International radiation commissions 1896 to 2008. Research into atmospheric radiation from IMO to IAMAS

    Energy Technology Data Exchange (ETDEWEB)

    Bolle, H J [comp.; Moeller, F; London, J

    2008-05-15

    The document covers a historical compilation on research into atmospheric radiation from 1896 to 2008. The first part is a brief history of the radiation commissions of IMO (International Meteorological Organization) and IUGG (International Union of Geodesy and Geophysics) for the period 1824 to 1948. Part 2 Covers the International Radiation Commission (IRC) of IAM (International Association of Meteorology)/IAMAS (International Association of Meteorology and Atmospheric Sciences)/IAMAP (International Association of Meteorology and Atmospheric Physics); the Re-constitution of the IUGG Radiation Commision, the Officers of the International Radiation Commission of IUUG 1948-2008, and the activities of the Radiation Commision of the IUGG 1948-2008. The appendices include the Radiation Commission Members, the summaries of presented papers from 1954 and 1957, the IRC publications, and acronyms.

  10. Radiation research within the framework programmes of the European Commission

    Energy Technology Data Exchange (ETDEWEB)

    Karaoglou, A.; Kelly, G.N.; Desmet, G.; Menzel, H.G.; Schibilla, H.; Olast, M.; Gasperini, F.; Chadwick, K.H.; Sinnave, J. [European Commission Directorate General science, Brussels (Belgium). Research and Development, Radiation Protection Research Action

    1997-09-01

    The background to the radiation protection research and training programme of the European Commission is described in the presentation. The objectives and achievements of the third framework programme are summarised together with a description of how the achievements led to the establishment of the priorities for the fourth framework programme. Indications on the preliminary prospects for the fifth framework programme, 1998-2002 are also given. (6 refs.).

  11. Charities' response to the European Commission call of interest for their involvement in the European Research Area

    CERN Document Server

    Sessano, D.

    2003-01-01

    This paper presents an exploratory study to investigate what could be the role of the charities concerned with scientific research in the European Research Area (ERA). The analysis particularly concentrates on UK and Italy. The questions on which the exploratory study was developed are: 1. “In what specific areas of the ERA did the European Commission (EC) for the involvement of charities? And could there be other areas in which charities might participate?” 2. “Given the role and situation of charities in UK and Italy, what role, if any, could they be willing to play in the ERA? Is it the same as the one proposed by the Commission or not?” In order to answer these questions, the following discussion will focus at first on a short overview of the charity sector, both at the general level and at the national level in UK and Italy. Then a brief presentation of the European Research Area will be given. The hypotheses of the study will then be presented, followed by a methodological section. Results wi...

  12. Study of the Nuclear Regulatory Commission's Appellate System

    International Nuclear Information System (INIS)

    Bickwit, L.; Malsch, M.; Ostrach, S.; Christenson, K.

    1979-12-01

    At the Chairman's request the Office of the General Counsel studied the Commission's appellate system. The study included examination of the development of the study, analysis of the current workload, investigation of the practices of other agencies, and consideration of alternatives to the present system. The study recommends retention of the present system with some limited modifications to enable the Commission to more effectively use its existing appellate powers

  13. Assessment of the implementation of a neutron measurement system during the commissioning of the Jordan Research and Training Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Bae, Sang Hoon; Suh, Sang Mun [Division of Research Reactor System Design, Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Cha, Han Ju [Dept. of Electrical Engineering, Intelligent Power Conversion Laboratory, Chungnam National University, Daejeon (Korea, Republic of)

    2017-04-15

    The Jordan Research and Training Reactor (JRTR) is the first research reactor in Jordan, the commissioning of which is ongoing. The reactor is a 5-MWth, open-pool type, light-water-moderated, and cooled reactor with a heavy water reflector system. The neutron measurement system (NMS) applied to the JRTR employs a wide-range fission chamber that can cover from source range to power range. A high-sensitivity boron trifluoride counter was added to obtain more accurate measurements of the neutron signals and to calibrate the log power signals; the NMS has a major role in the entire commissioning stage. However, few case studies exist concerning the application of the NMS to a research reactor. This study introduces the features of the NMS and the boron trifluoride counter in the JRTR and shares valuable experiences from lessons learned from the system installation to its early commissioning. In particular, the background noise relative to the signal-to-noise ratio and the NMS signal interlock are elaborated. The results of the count rates with the neutron source and the effects of the discriminator threshold are summarized.

  14. Yale and the Atomic Bomb Casualty Commission

    International Nuclear Information System (INIS)

    Bowers, J.Z.

    1983-01-01

    This is a description, based largely on personal discussions, of the contributions of men from the Yale University School of Medicine to the saga of the immediate and long-term studies on the medical effects of the atomic bombs at Hiroshima and Nagasaki. They played key roles in the immediate studies of bomb effects, in the creation of long-term studies of delayed effects, and in elevating the Atomic Bomb Casualty Commission after 1955 to a position of excellence in its studies and relations with the Japanese. The accumulation of the information presented in this paper derives from research for the preparation of the history of the Atomic Bomb Casualty Commission. In 1975, the commission was passed to Japanese leadership as the Radiation Effects Research Foundation

  15. Tritium research and technology facilities for fusion inside the Bruyeres-le-Chatel Research Center of the French Atomic Energy Commission

    International Nuclear Information System (INIS)

    Hircq, B.

    1990-01-01

    Because of a large tritium experience in the Bruyeres-le-Chatel Research Center (Atomic Energy Commission-FRANCE), new activities could be undertaken in 1986 inside the European Fusion Technology Program, especially tritium studies within the frame work of the Next European Torus. After presenting the general tritium research program which concerns the Torus Exhaust Gas Processing (deuterium-tritium purification and storage) and involved materials (weldability of tritium-helium containing steels and corrosion of steels by tritiated water), major obtained results are given before describing the associated equipments. (orig.)

  16. Radiological and Medical Sciences Research Institute, Ghana Atomic Energy Commission: Annual Report 2014

    International Nuclear Information System (INIS)

    2014-01-01

    The Radiological and Medical Sciences Research Institute was established in 2009, as the forth research institute of the Ghana Atomic Energy Commission. This Annual Report provides an overview of the major activities of the Institutes in the year 2014. Major items covered in the report include: Strategic objectives; Collaborations; Personnel and Organisational Structure; Facilities and Technical Services; Summary of Research and Development Projects; Human Resource Development; Publications and Technical Reports.

  17. 76 FR 21369 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2011-04-15

    ... technological advances; examine diverse perspectives and possibilities for useful international collaboration on... emerging research in biomedicine and related areas of science and technology. The Commission is charged to... research, healthcare delivery, and technological innovation. In undertaking these duties, the Commission...

  18. Australian Atomic Energy Commission: A new energy research establishment at Lucas Heights

    Energy Technology Data Exchange (ETDEWEB)

    Moyal, A [Sydney Univ. (Australia). Dept. of Government and Public Administration

    1980-02-01

    A review of the role of the Atomic Energy Commission has recommended that the Lucas Heights establishment should engage in research on energy sources in general, rather than nuclear only as at present, and that certain of its present functions (regulatory and manufacturing) should be handled by other organisations.

  19. Some Main Results of Commissioning of the Dalat Research Reactor with Low Enriched Fuel

    International Nuclear Information System (INIS)

    Nguyen Nhi Dien; Luong Ba Vien; Pham Van Lam; Le Vinh Vinh; Huynh Ton Nghiem

    2014-01-01

    After completion of design calculation of the Dalat Nuclear Research Reactor (DNRR) for conversion from high-enriched uranium fuel (HEU) to low-enriched uranium (LEU) fuel, the commissioning programme for DNRR with entire core loaded with LEU fuel was successfully carried out from 24 November 2011 to 13 January 2012. The experimental results obtained during the implementation of commissioning programme showed a good agreement with design calculations and affirmed that the DNRR with LEU core have met all safety and exploiting requirements. (author)

  20. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  1. U.S. Radioecology Research Programs of the Atomic Energy Commission in the 1950s

    Energy Technology Data Exchange (ETDEWEB)

    Reichle, D.E.

    2004-01-12

    This report contains two companion papers about radiological and environmental research that developed out of efforts of the Atomic Energy Commission in the late 1940s and the 1950s. Both papers were written for the Joint U.S.-Russian International Symposium entitled ''History of Atomic Energy Projects in the 1950s--Sociopolitical, Environmental, and Engineering Lessons Learned,'' which was hosted by the International Institute for Applied Systems Analysis in Laxemberg, Austria, in October 1999. Because the proceedings of this symposium were not published, these valuable historic reviews and their references are being documented as a single ORNL report. The first paper, ''U.S. Radioecology Research Programs Initiated in the 1950s,'' written by David Reichle and Stanley Auerbach, deals with the formation of the early radioecological research programs at the U.S. Atomic Energy Commission's nuclear production facilities at the Clinton Engineering Works in Oak Ridge, Tennessee; at the Hanford Plant in Richland, Washington; and at the Savannah River Plant in Georgia. These early radioecology programs were outgrowths of the environmental monitoring programs at each site and eventually developed into the world renowned National Laboratory environmental program sponsored by the Office of Biological and Environmental Research of the U.S. Department of Energy. The original version of the first paper was presented by David Reichle at the symposium. The second paper, ''U.S. Atomic Energy Commission's Environmental Research Programs Established in the 1950s,'' summarizes all the environmental research programs supported by the U.S. Atomic Energy Commission in the 1950s and discusses their present-day legacies. This paper is a modified, expanded version of a paper that was published in September 1997 in a volume commemorating the 50th anniversary symposium of the U.S. Department of Energy's Office of

  2. Qualitative study investigating the commissioning process for older people's services provided by third sector organisations: SOPRANO study protocol.

    Science.gov (United States)

    Sands, Gina; Chadborn, Neil; Craig, Chris; Gladman, John

    2016-05-18

    The commissioning of third sector services for older people may influence the quality, availability and coordination of services for older people. The SOPRANO study aims to understand the relationships between and processes of commissioning bodies and third sector organisations providing health and social care services for older people. This qualitative study will be based in the East Midlands region of England. An initial scoping survey of commissioners will give an overview of services to maintain the health and well-being of older people in the community that are commissioned. Following this, semistructured interviews will be conducted with 4 sample groups: health and social care commissioners, service provider managers, service provider case workers and older service users. A sample size of 10-15 participants in each of the 4 groups is expected to be sufficient to reach data saturation, resulting in a final expected sample size of 40-60 participants. Informed consent will be gained from all participants, and those unable to provide informed consent will be excluded. The interview data will be analysed by 2 researchers using framework content analysis. Approval for the study has been gained from the University of Nottingham School of Medicine ethical review board, and the relevant approvals have been gained from the National Health Service (NHS) research and development departments for interviewing NHS staff. Early engagement with a wide range of stakeholders will ensure that the research findings are extensively disseminated to relevant stakeholders (including commissioners and third sector providers) in an accessible format using the extensive communication networks available to the National Institute for Health Research (NIHR) Collaboration for Leadership in Applied Health Research and Care CLAHRCs (applied health research organisations covering all of England). The study will also be disseminated through academic routes such as conference presentations and

  3. Regional health workforce planning through action research: lessons for commissioning health services from a case study in Far North Queensland.

    Science.gov (United States)

    Panzera, Annette June; Murray, Richard; Stewart, Ruth; Mills, Jane; Beaton, Neil; Larkins, Sarah

    2016-01-01

    Creating a stable and sustainable health workforce in regional, rural and remote Australia has long been a challenge to health workforce planners, policy makers and researchers alike. Traditional health workforce planning is often reactive and assumes continuation of current patterns of healthcare utilisation. This demonstration project in Far North Queensland exemplifies how participatory regional health workforce planning processes can accurately model current and projected local workforce requirements. The recent establishment of Primary Health Networks (PHNs) with the intent to commission health services tailored to individual healthcare needs underlines the relevance of such an approach. This study used action research methodology informed by World Health Organization (WHO) systems thinking. Four cyclical stages of health workforce planning were followed: needs assessment; health service model redesign; skills-set assessment and workforce redesign; and development of a workforce and training plan. This study demonstrated that needs-based loco-regional health workforce planning can be achieved successfully through participatory processes with stakeholders. Stronger health systems and workforce training solutions were delivered by facilitating linkages and planning processes based on community need involving healthcare professionals across all disciplines and sectors. By focusing upon extending competencies and skills sets, local health professionals form a stable and sustainable local workforce. Concrete examples of initiatives generated from this process include developing a chronic disease inter-professional teaching clinic in a rural town and renal dialysis being delivered locally to an Aboriginal community. The growing trend of policy makers decentralising health funding, planning and accountability and rising health system costs increase the future utility of this approach. This type of planning can also assist the new PHNs to commission health services

  4. Atomic Energy Commission Act, 2000 (Act 588)

    International Nuclear Information System (INIS)

    2000-01-01

    Act 588 of the Republic of Ghana entitled, Atomic Energy Commission Act, 2000, amends and consolidates the Atomic Energy Commission Act, 204 of 1963 relating to the establishment of the Atomic Energy Commission. Act 588 makes provision for the Ghana Atomic Energy Commission to establish more institutes for the purpose of research in furtherance of its functions and also promote the commercialization of its research and development results. (E.A.A.)

  5. Research on nuclear energy within the European Commission Research Framework Programme

    International Nuclear Information System (INIS)

    Forsstroem, H.

    2000-01-01

    The strategic goal of the 5 th EURATOM RTD Framework Programme (FP5) is to help exploit the full potential of nuclear energy in a sustainable manner, by making current technologies even safer and more economical and by exploring promising new concepts. The programme covers nuclear fusion, nuclear fission and radiation protection. Part of the programme on nuclear fission and radiation protection is being implemented through ''indirect actions'', i.e. research co-sponsored (up to 50% of total costs) and co-ordinated by DG RESEARCH of the European Commission (EC) but carried out by external public and private organisations as multi-partner projects. The budget available for these indirect actions during FP5 (1998-2002) is 191 MEuro. The programme covers four different areas: safety of existing reactors, including plant life management, severe accident management and development of evolutionary systems; safety of the fuel cycle, including radioactive waste management and disposal, partitioning and transmutation and decommissioning of nuclear installation; safety of future systems, including new or revisited reactor or fuel cycle concepts; radiation protection and radiological sciences, including both basic radiobiology and radiophysics and issues connected to the application of radiation protection. After the first calls for proposals of FP5, which were evaluated in 1999 about 140 research projects have been selected for funding and is now in the process of starting. In parallel the research projects that were supported in the 4th Framework Programme (1994 - 1998) are coming to an end, and being reported, at the same time as the first thoughts on the 6 t h FP are discussed.An important new component for the future research in Europe is the concept of a European Research Area (ERA). The purpose of ERA is to create better overall framework conditions for research in Europe. Some of the concepts being discussed in this context are networking of centres of excellence, a

  6. Commission of the european communities. Joint research centre. Petten Establishment. Annual Report 1977

    International Nuclear Information System (INIS)

    1977 marked the beginning of a new multiannual research programme for the European Commission's Joint research Centre. Regarding the exploitation of HFR (High Flux Reactor), the year was one of steady, on-schedule operation with high utilization, although this fell off slightly in the autumn due to overloading of our capsule project engineering team and manufacturing services. We are pleased to note that the HFR Users' Meeting, held in October, drew about 100 participants from Europe and America and demonstrated a lively interest in the Commission's materials testing reactor. Technical improvements to the plant are being examined as one means of maintaining or even increasing this interest in the 1980's. Following the wishes of the Council of Ministers, new Advisory Committees for Programme Management have been set up for all the Joint Research Centre's activities and those for HFR and High Temperature Materials Programmes have met at Petten. This latter Committee is entirely new to its task, the programme having been served until 1977 by a number of ad hoc meetings of national experts. The work of the Organic Chemistry Laboratory falls under the wings of the Community Reference Bureau Advisory Committee, who have met in Brussels and strongly encouraged the development of the activity

  7. Ghana Atomic Energy Commission: Annual Report 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute.

  8. Ghana Atomic Energy Commission: Annual Report 2001

    International Nuclear Information System (INIS)

    2002-01-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute

  9. Nine centuries waiting: The experiences of Iranians surrogacy commissioning mothers

    OpenAIRE

    Zandi, Mitra; Vanaki, Zohreh; Shiva, Marziyeh; Mohammadi, Eesa

    2014-01-01

    Background: There are a few studies about commissioning mothers’ understanding from the surrogacy during 9 months of waiting for delivery in Iran and other countries. This study was conducted with an aim to explore and explain the nature of concerns (experiences) of commissioning mothers. Materials and Methods: A qualitative design with a conventional content analysis approach was used to gather and analyze the experiences of commissioning mothers. They were selected from Royan Research Centr...

  10. European Commission research on aircraft impacts in the atmosphere

    Energy Technology Data Exchange (ETDEWEB)

    Amanatidis, G T; Angeletti, G [European Commission (CEC), Brussels (Belgium)

    1998-12-31

    Aircraft engines release in the troposphere and lower stratosphere a number of chemical compounds (NO{sub x}, CO{sub 2}, CO, H{sub 2}O, hydrocarbons, sulphur, soot, etc.) which could potentially affect the ozone layer and the climate through chemical, dynamical and radiative changes. The global amount of gases and particles emitted by current subsonic and projected supersonic aircraft fleets can be estimated, but significant uncertainties remain about the fate of these emissions in the atmosphere. The European efforts concerning these potential atmospheric impacts of aircraft emissions are conducted by the Environment and Climate Research Programme of the European Commission (EC) as well as by national programmes of the Member States of the European Union (EU). The European research activities in this field, are described, divided for practical reasons in two periods. The first includes activities supported under the 3. Framework Programme for R and D activities which covered the period from 1992 up to 1996, while the second period has started in early 1996 and is supported under the 4. Framework Programme. (R.P.) 6 refs.

  11. European Commission research on aircraft impacts in the atmosphere

    Energy Technology Data Exchange (ETDEWEB)

    Amanatidis, G.T.; Angeletti, G. [European Commission (CEC), Brussels (Belgium)

    1997-12-31

    Aircraft engines release in the troposphere and lower stratosphere a number of chemical compounds (NO{sub x}, CO{sub 2}, CO, H{sub 2}O, hydrocarbons, sulphur, soot, etc.) which could potentially affect the ozone layer and the climate through chemical, dynamical and radiative changes. The global amount of gases and particles emitted by current subsonic and projected supersonic aircraft fleets can be estimated, but significant uncertainties remain about the fate of these emissions in the atmosphere. The European efforts concerning these potential atmospheric impacts of aircraft emissions are conducted by the Environment and Climate Research Programme of the European Commission (EC) as well as by national programmes of the Member States of the European Union (EU). The European research activities in this field, are described, divided for practical reasons in two periods. The first includes activities supported under the 3. Framework Programme for R and D activities which covered the period from 1992 up to 1996, while the second period has started in early 1996 and is supported under the 4. Framework Programme. (R.P.) 6 refs.

  12. Assessment report no. 1 by the National Commission for assessment of researches and studies related to the management of radioactive materials and wastes

    International Nuclear Information System (INIS)

    2007-06-01

    After a presentation of the main orientations of the Commission, this report describes the legal framework for the management of radioactive materials and wastes (long life high level and intermediate level wastes, other wastes, separation and transmutation, waste packaging), proposes an assessment of researches and studies coordinated by the ANDRA (on high and medium level wastes) and of those coordinated by the CEA (on separation and transmutation, on waste packaging and long term behaviour). It gives an overview of recent international developments in the field of nuclear waste storage (in Sweden, Finland, United-Kingdom, Canada, United States, and Belgium)

  13. National Capital Planning Commission Meeting Transcripts

    Data.gov (United States)

    National Capital Planning Commission — Transcripts of the monthly (with the exception of August) National Capital Planning Commission meeting transcripts are provided for research to confirm actions taken...

  14. A Virtual Commissioning Learning Platform

    DEFF Research Database (Denmark)

    Mortensen, Steffen; Madsen, Ole

    2018-01-01

    The introduction of reconfigurable manufacturing systems (RMS), Industry 4.0 and the associated technologies requires the establishment of new competencies. Towards that goal, Aalborg University (AAU) has developed an Industry 4.0 learning factory, the AAU Smart Production Lab. The AAU Smart...... Production Lab integrates a number of Industry 4.0 technologies for learning and research purposes. One of the many techniques is virtual commissioning. Virtual commissioning uses a virtual plant model and real controllers (PLCs) enabling a full emulation of the manufacturing system for verification. Virtual...... commissioning can lower the commissioning time up to 63%, allowing faster time to market. However, virtual commission is still missing industrial impact one of the reasons being lack of competencies and integration experiences. The paper presents the setup of the virtual commissioning learning platform...

  15. Report of promotion expert commission for radiation application on 'Promotion of accelerator application study'

    International Nuclear Information System (INIS)

    1997-01-01

    This is a report published on June, 1996, by promotion expert commission for radiation application of the Atomic Energy Commission. Japanese research and development in the fields of forming and application techniques of radiation beams using accelerator is at comparatively high level in the world, and it seems to be important for Japan not only to maintain these research and development level but also to contribute to creation of worldwide intelligent welfare due to scientific technology. In this report, some investigations are conducted on present state and future view of the radiation application study using accelerator, accelerator facility necessary to promote such application study and a procedure to execute its smooth application. However, objects of the study are not limited only for physical study on elementary particle and atomic nucleus, but expanded to photon, electron, positron, muon, proton, neutron, various inonic beams and RI beams for radiations, which are widely applied to industries such as materials science, material engineering, bio-and life-science, medical science, technical engineering, and so forth, and which will be expected for large contribution to development of these industries. The following items are discussed here; 1) present state and future view of radiation application study using accelerator, 2) Accelerator to be prepared and its executing method, and 3) Promotion method of the accelerator application study. (G.K.)

  16. Managing vital records in the Ghana Atomic Energy Commission

    International Nuclear Information System (INIS)

    Osei, Mary Mavis

    2004-05-01

    Several vital records can be found within the Ghana Atomic Energy Commission. Some of these records include confidential files on staff and general purpose files on staff, specialised subject files on IAEA, FAO, UN agencies etc, records on agreements from memorandum of understanding between the commission and other organisations, legislative instruments establishing the commission and its institutes and research publications. The study critically examined how these vital records at the Ghana Atomic Energy Commission were managed with the view of identifying problems and to propose actions for improvement. The specific objectives of the study was to examine methods of storage, security measures put in place to manage vital records, committment of management and staff to these measures, quality of records staff and vital records policy. Recommendations have been provided to help in the efficient and effective management of records in the commission. (A.B.)

  17. PRA research and the development of risk-informed regulation at the U.S. nuclear regulatory commission

    International Nuclear Information System (INIS)

    Siu, Nathan; Collins, Dorothy

    2008-01-01

    Over the years, Probabilistic Risk Assessment (PRA) research activities conducted at the U.S. Nuclear Regulatory Commission (NRC) have played an essential role in support of the agency's move towards risk-informed regulation. These research activities have provided the technical basis for NRC's regulatory activities in key areas; provided PRA methods, tools, and data enabling the agency to meet future challenges; supported the implementation of NRC's 1995 PRA Policy Statement by assessing key sources of risk; and supported the development of necessary technical and human resources supporting NRC's risk-informed activities. PRA research aimed at improving the NRC's understanding of risk can positively affect the agency's regulatory activities, as evidenced by three case studies involving research on fire PRA, Human Reliability Analysis (HRA), and Pressurized Thermal Shock (PTS) PRA. These case studies also show that such research can take a considerable amount of time, and that the incorporation of research results into regulatory practice can take even longer. The need for sustained effort and appropriate lead time is an important consideration in the development of a PRA research program aimed at helping the agency address key sources of risk for current and potential future facilities

  18. Public education and enforcement research study (PEERS).

    Science.gov (United States)

    2013-08-01

    In 2001, the Federal Railroad Administration (FRA) and the Illinois Commerce Commission (ICC) established the Public Education and Enforcement Research Study (PEERS) to test the effectiveness of various education and enforcement (E&E) techniques to i...

  19. Primary care-led commissioning: applying lessons from the past to the early development of clinical commissioning groups in England.

    Science.gov (United States)

    Checkland, Kath; Coleman, Anna; McDermott, Imelda; Segar, Julia; Miller, Rosalind; Petsoulas, Christina; Wallace, Andrew; Harrison, Stephen; Peckham, Stephen

    2013-09-01

    The current reorganisation of the English NHS is one of the most comprehensive ever seen. This study reports early evidence from the development of clinical commissioning groups (CCGs), a key element in the new structures. To explore the development of CCGs in the context of what is known from previous studies of GP involvement in commissioning. Case study analysis from sites chosen to provide maximum variety across a number of dimensions, from September 2011 to June 2012. A case study analysis was conducted using eight detailed qualitative case studies supplemented by descriptive information from web surveys at two points in time. Data collection involved observation of a variety of meetings, and interviews with key participants. Previous research shows that clinical involvement in commissioning is most effective when GPs feel able to act autonomously. Complicated internal structures, alongside developing external accountability relationships mean that CCGs' freedom to act may be subject to considerable constraint. Effective GP engagement is also important in determining outcomes of clinical commissioning, and there are a number of outstanding issues for CCGs, including: who feels 'ownership' of the CCG; how internal communication is conceptualised and realised; and the role and remit of locality groups. Previous incarnations of GP-led commissioning have tended to focus on local and primary care services. CCGs are keen to act to improve quality in their constituent practices, using approaches that many developed under practice-based commissioning. Constrained managerial support and the need to maintain GP engagement may have an impact. CCGs are new organisations, faced with significant new responsibilities. This study provides early evidence of issues that CCGs and those responsible for CCG development may wish to address.

  20. Sustainable and resource efficient intensivation of crop production - Perspectives of agro-ecosystem research Policy paper of the DFG Senate Commission on Agroecosystem Research

    NARCIS (Netherlands)

    Wolters, V.; Isselstein, J.; Stützel, H.; Ordon, F.; Haaren, von C.; Schlecht, E.; Wesseler, J.H.H.; Birner, R.; Lützow, von M.; Brüggemann, N.; Diekkrüger, B.; Fangmeier, A.; Flessa, H.; Kage, H.; Kaupenhohann, M.; Kögel-Knabner, I.; Mosandl, R.; Seppelt, R.

    2014-01-01

    With its policy paper the Senate Commission on Agro-ecosystemResearch of the Deutsche Forschungsgemeinschaft(DFG) summarizes potential benefits of basic researchfor the sustainable intensification of crop production. Agro-ecosystems critically contribute to fulfilling the need forincreasing food and

  1. Swiss Federal Energy Research Commission - Annual report 2008; Eidgenoessische Energieforschungskommission CORE. Jahresbericht 2008

    Energy Technology Data Exchange (ETDEWEB)

    Maus, K.

    2009-07-01

    This annual report presents a review of the activities carried out by the Swiss Federal Energy Research Commission CORE in the year 2008. Main points of interest were the definition of a new CORE vision, a review of all research programmes, co-operation and co-ordination with public and private institutes, active consultancy, recommendations for further education and training, improved international information exchange and good communication with business, politics and the general public. The definition of a concept for Swiss energy research for the period 2012 to 2016 is mentioned. The annual report also reports on an internal visit made to various laboratories of the Swiss Federal Institute of Technology in Lausanne and the Energy Center in Zurich. The focussing of CORE activities on particular themes is discussed

  2. The role of national ethics commissions in Finland.

    Science.gov (United States)

    Halila, Ritva

    2003-08-01

    There are six national ethics commissions in Finland. The National Advisory Board on Research Ethics was first established in 1991, followed by the National Advisory Board on Biotechnology and the Board on Gene Technology in 1995. The National Advisory Board on Health Care Ethics was established in 1998, followed by its Sub-Committee on Medical Research Ethics in 1999. The Co-operation Group for Laboratory Animal Sciences was established in 2001. Only the Board on Gene Technology works as a national authority and gives binding opinions and recommendations about the use of genetically modified organisms. The Sub-Committee on Medical Research Ethics acts a national research ethics committee and gives opinions about research projects. Other advisory boards do not make legally binding decisions, but their expertise gives a lot of power to their opinions and statements. The commissions work in close collaboration with each other, having regular meetings. They arrange seminars and conferences, and share information with each other. The commissions also share duties and information in international collaboration. How the voice and opinions of these commissions is heard in society lies in the wide, multi-professional expertise of their members. Large commissions and wide expertise may make it difficult to find consensus in their opinions and statements, although wide expertise may, more than discussion in a small expert group, help to further process difficult ethical issues. Collaboration between different bodies is important in order to share duties, and also to add more emphasis to the statements and opinions where different bodies share interests. In our country, the interest that national commissions share is research ethics, where the advisory boards and their members have discharged collaborative activities for years.

  3. Supplementary plasma heating studies in the Atomic Energy Commission France

    International Nuclear Information System (INIS)

    Consoli, T.

    1976-01-01

    The research on supplementary heating of toroidal plasma made in France at the Atomic Energy Commission and in the European Community are described (with special reference to the J.E.T. project) in the frame of the national programs. A non exhaustive description of the world effort in this topic is also presented: (neutral injection heating, TTMP (transit time magnetic pumping) heating, electron and ion cyclotron resonance, and lower hybrid resonance heating)

  4. Radioactive waste management: outline of the research programme of the Commission of the European Communities

    International Nuclear Information System (INIS)

    Bresesti, M.

    1980-01-01

    The lines of activity, the main achievements and the perspectives of the research programme of the Commission of the European Communities on radioactive waste management, are presented. In particular an overall view of the activity on chemical separation and nuclear transmutation of actinides is given, as introduction to the various presentations of the JRC staff on specific aspects of this waste management strategy

  5. Feasibility study for the Nuclear Research Centre of the Nuclear Energy Commission

    International Nuclear Information System (INIS)

    1985-01-01

    The feasibility study was carried out in order to evaluate the possibility of building a Nuclear Research Centre in Uruguay, which would support a wide range of nuclear related technological activities. A market research was carried out, of the products to be manufactured at the Nuclear Centre, regarding the size of production. A detailed list of the main products considered is enclosed. The siting study was performed through the analysis of the incidental factors, such as environment, technical scope and socio-ecomonic factors. An engineering study for the main installations was done. The investment and financial sources were also studied

  6. Commission on Legal Matters

    CERN Multimedia

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  7. Part of the inter ministerial commission of artificial radioelements (cirea) in the areas of medicine, research and industry

    International Nuclear Information System (INIS)

    Fages, D.Ph.

    2000-01-01

    The Inter ministerial commission of artificial radioelements (C.I.R.E.A.) has been implemented to regulate the production, import, use of artificial radioelements. It gives advices in areas such preparation, import, export, fabrication, calibration, transport, transfer as well as the general conditions of use, the measures of protection against the effects of radiations. The commission is divided in two sections: for the first one, it treats the questions relative to medical practices and human biology, for the second one it treats questions relative to others areas( agriculture, industry, research else than medical one). (N.C.)

  8. Advancing Ethical Neuroscience Research.

    Science.gov (United States)

    Borah, B Rashmi; Strand, Nicolle K; Chillag, Kata L

    2016-12-01

    As neuroscience research advances, researchers, clinicians, and other stakeholders will face a host of ethical challenges. The Presidential Commission for the Study of Bioethical Issues (Bioethics Commission) has published two reports that provide recommendations on how to advance research endeavors ethically. The commission addressed, among other issues, how to prioritize different types of neuroscience research and how to include research participants who have impaired consent capacity. The Bioethics Commission's recommendations provide a foundation for ethical guidelines as neuroscience research advances and progresses. © 2016 American Medical Association. All Rights Reserved.

  9. Salinity guidelines for irrigation: Case studies from Water Research ...

    African Journals Online (AJOL)

    Salinity guidelines for irrigation: Case studies from Water Research Commission projects along the Lower Vaal, Riet, Berg and Breede Rivers. ... It is suggested that a more dynamic approach be used for managing salinity under irrigation at farm level, i.e. the use of models. Amongst others, future research should focus on ...

  10. Public education and enforcement research study : Macomb, Illinois : analysis

    Science.gov (United States)

    2011-03-01

    The Public Education and Enforcement Research Study (PEERS) was a collaborative effort between the Federal Railroad Administration, the Illinois Commerce Commission, and local communities in the State of Illinois. This project was designed to promote...

  11. Philippine Atomic Energy Commission: Annual report 1982

    International Nuclear Information System (INIS)

    1983-02-01

    This publication enumerates the research and development activities of the Philippine Atomic Energy Commission with priorities geared towards achieving the economic and social upliftment of the Filipinos in the field of agriculture, energy, industry, health and environment. Highlights are summaries of investigations and studies of great importance in crop improvement, animal production, nuclear fuels, nutrition research, not to mention its supportive technology, technical services, nuclear information and public acceptance, and nuclear manpower development. (RTD)

  12. Truth commissions and gender: A South African case study

    African Journals Online (AJOL)

    groups and activists led the Commission to take up gender in ad hoc ways, such ... evaluating the Commission, it is possible to see how its ad hoc approach to gender ... on 'hearing the experiences of victims of gross violations from the people.

  13. Time for Change? Climate Science Reconsidered: Report of the UCL Policy Commission on Communicating Climate Science, 2014

    OpenAIRE

    Rapley, C. G.; De Meyer, K.; Carney, J.; Clarke, R.; Howarth, C.; Smith, N.; Stilgoe, J.; Youngs, S.; Brierley, C.; Haugvaldstad, A.; Lotto, B.; Michie, S.; Shipworth, M.; Tuckett, D.

    2014-01-01

    The UCL Policy Commission on the Communication of Climate Science, chaired by Professor Chris Rapley comprises a cross-disciplinary project group of researchers from psychology, neuroscience, science and technology studies, earth sciences and energy research. The Commission examined the challenges faced in communicating climate science effectively to policy-makers and the public, and the role of climate scientists in communication. / The Commission explored the role of climate scientists in c...

  14. Post commissioning noise study

    International Nuclear Information System (INIS)

    Heraud, P.

    2008-01-01

    This presentation described a wind farm post-commissioning study conducted at a wind farm owned by Helimax Energy Inc. The farm was located in a partly-forested, partly cultivated region in Quebec that featured gently rolling hills. Over 600 dwellings were located within 2 km of the wind farm, and 44 dwellings were within the wind farm's boundaries. The noise impact assessments were conducted at various points near the wind farm. The wind farm was designed using an International Standards Organization (ISO) noise propagation model and a 40 dBA to provide adequate setbacks. The study was conducted using 10 days of continuous measurements at selected points of a wind farm. Points of reception included points from 650 m to 800 m. Noise over 2 km was not thought to be contributed by the wind turbine. The nearest dwelling was 512 m from one of the farm's wind turbines. The study also considered ground factor, temperature, relative humidity, and the height of the receptors. Quebec noise level limits are 40 dBA at night, and 45 dBA during the day. Noise level limits are independent of wind speed. Measured noise contributions over 40 dBA were not observed during the measurement program. The wind turbines were only audible for 1 night out of the 30 night study period. It was concluded that the ISO noise propagation model is a reliable tool for conducting noise impact assessments. tabs., figs

  15. Commissioning an Engineering Scale Coal Gasifier

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Douglas J.; Bearden, Mark D.; Cabe, James E.

    2010-07-01

    This report explains the development, commissioning, and testing of an engineering scale slagging coal gasifier at PNNL. The initial objective of this project was to commission the gasifier with zero safety incidents. The commissioning work was primarily an empirical study that required an engineering design approach. After bringing the gasifier on-line, tests were conducted to assess the impact of various operating parameters on the synthesis gas (syngas) product composition. The long-term intent of this project is to produce syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in catalyst, materials, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for greater than 4 hours using coal feedstock. In addition, alternate designs that allow for increased flexibility regarding the fuel sources that can be used for syngas production is desired. Continued modifications to the fuel feed system will be pursued to address these goals. Alternative feed mechanisms such as a coal/methanol slurry are being considered.

  16. Radiological emergency preparedness arrangements in the European Commission

    International Nuclear Information System (INIS)

    Tanner, V.

    2002-01-01

    The purpose of this paper is to give an overview of the different procedures established within the European Commission, which are relevant to radiological emergency planning and response. Although emergency preparedness is a national responsibility within the European Union, the Commission has clearly defined operational tasks in terms of emergency information exchange and community foodstuff regulations. In addition the Commission promotes research programmes and training courses in the field

  17. Survey on the virtual commissioning of manufacturing systems

    Directory of Open Access Journals (Sweden)

    Chi G. Lee

    2014-07-01

    Full Text Available This paper reviews and identifies issues in the application of virtual commissioning technology for automated manufacturing systems. While the real commissioning of a manufacturing system involves a real plant system and a real controller, the virtual commissioning deals with a virtual plant model and a real controller. The expected benefits of virtual commissioning are the reduction of debugging and correction efforts during the subsequent real commissioning stage. However, it requires a virtual plant model and hence still requires significant amount time and efforts. Two main issues are identified, the physical model construction of a virtual device, and the logical model construction of a virtual device. This paper reviews the current literature related to the two issues and proposes future research directions to achieve the full utilization of virtual commissioning technology.

  18. Proceedings of the international workshop on building the new HRA: errors of commission - from research to application

    International Nuclear Information System (INIS)

    2003-01-01

    The main mission of the Working Group on Risk Assessment (RISK) is to advance the understanding and utilisation of probabilistic safety analysis (PSA) in ensuring continued safety of nuclear installations in Member countries. One of the major criticisms of current PSAs is that they do not adequately address an important class of human system interactions, namely inappropriate actions, particularly those that might occur during the response to a transient or accident, that place the plant in a situation of higher risk. This class of inappropriate actions is often referred to as 'errors of commission'. The principal characteristic of an error of commission in a PSA context is that its consequence is a state of unavailability of a component, system or function. This is in contrast to an error of omission, which is characterised by a lack of action and, therefore, preserves the status quo of a system, component, or function. In the PSA context, the most significant errors of commission are those that, in addition to resulting in failure to perform some function, also fail or make unavailable other equipment or functions needed to mitigate the accident scenario, or otherwise exacerbate the situation. The workshop reported herein is an extension of the work of the Working Group on Risk Assessment (RISK) performed to review errors of commission in probabilistic safety analysis (NEA/CSNI/R(2000)17). The main purpose of the meeting was to provide a forum for exchange of information including lessons learned, identification of gaps in our current understanding and knowledge, data needs, and research needs. This workshop also provides a perspective for another workshop, Building the New HRA: Strengthening the Link Between Experience and HRA, to be held in Munich in January of 2002. Individual speakers present a broad international perspective that summarises technical issues, lessons learned, and experiences gained through applying second-generation human reliability

  19. Review and evaluation of the Nuclear Regulatory Commission safety research program for Fiscal Year 1983. Report to the Congress

    International Nuclear Information System (INIS)

    1982-02-01

    Public Law 95-209 includes a requirement that the Advisory Committee on Reactor Safeguards submit an annual report to Congress on the safety research program of the Nuclear Regulatory Commission. This report presents the results of the ACRS review and evaluation of the NRC safety research program for Fiscal Year 1983. The report contains a number of comments and recommendations

  20. Training related research and development conducted at Oak Ridge National Laboratory for the US Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Haas, P.M.

    1985-01-01

    For a number of years Oak Ridge National Laboratory (ORNL) has conducted a sizeable program of human factors research and development in support of the Office of Nuclear Regulatory Research of the US Nuclear Regulatory Commission (NRC). The history of this effort has in many ways paralleled the growth of human factors R and D throughout the nuclear industry and the program has contributed to advances in the industry as well as to NRC regulatory and research programs. This paper reviews the major projects and products of the program relevant to training and concludes with an identification of future R and D needs

  1. Marketing Plan and Marketing Research for KUAS Game Studies

    OpenAIRE

    Tukiainen, Reno

    2012-01-01

    This thesis was commissioned by Tieto^2 Project. The aim of the thesis was to study higher education marketing, including marketing planning and marketing research, from the point of view of marketing Kajaani University of Applied Sciences game study programmes. After the relevant theoretical literature was reviewed, a marketing research was conducted by interviewing current KUAS game students and new applicants who had applied for KUAS game studies in the spring of 2012. Based on the analyse...

  2. The U.S. Nuclear Regulatory Commission Thermal-Hydraulic Research Program: Maintaining expertise in a changing environment

    International Nuclear Information System (INIS)

    Sheron, B.W.; Shotkin, L.M.; Baratta, A.J.

    1993-01-01

    Throughout the 1970s and early 1980s, the U.S. Nuclear Regulatory Commission's (NRC's) thermal-hydraulic research program enjoyed ample funding, sponsored extensive experimental and analytical development programs, and attracted worldwide expertise. With the completion of the major experimental programs and with the promulgation of the revised emergency core-cooling system rule, both the funding and prominence of thermal-hydraulic research at the NRC have declined in recent years. This has led justifiably to the concern by some that the program may no longer have the minimal elements needed to maintain both expertise and world-class status. The purpose of this article is to describe the NRC's current thermal-hydraulic research program and to show how this program ensures maintenance of a viable, robust research effort and retention of needed expertise and international leadership

  3. Methods for Automated and Continuous Commissioning of Building Systems

    Energy Technology Data Exchange (ETDEWEB)

    Larry Luskay; Michael Brambley; Srinivas Katipamula

    2003-04-30

    Avoidance of poorly installed HVAC systems is best accomplished at the close of construction by having a building and its systems put ''through their paces'' with a well conducted commissioning process. This research project focused on developing key components to enable the development of tools that will automatically detect and correct equipment operating problems, thus providing continuous and automatic commissioning of the HVAC systems throughout the life of a facility. A study of pervasive operating problems reveled the following would most benefit from an automated and continuous commissioning process: (1) faulty economizer operation; (2) malfunctioning sensors; (3) malfunctioning valves and dampers, and (4) access to project design data. Methodologies for detecting system operation faults in these areas were developed and validated in ''bare-bones'' forms within standard software such as spreadsheets, databases, statistical or mathematical packages. Demonstrations included flow diagrams and simplified mock-up applications. Techniques to manage data were demonstrated by illustrating how test forms could be populated with original design information and the recommended sequence of operation for equipment systems. Proposed tools would use measured data, design data, and equipment operating parameters to diagnosis system problems. Steps for future research are suggested to help more toward practical application of automated commissioning and its high potential to improve equipment availability, increase occupant comfort, and extend the life of system equipment.

  4. 77 FR 2298 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2012-01-17

    ... nation's leaders in medicine, science, ethics, religion, law, and engineering. The Commission advises the President on bioethical issues arising from advances in biomedicine and related areas of science and... research, health care delivery, and technological innovation are conducted in a socially and ethically...

  5. BROOKHAVEN: Booster commissioned

    Energy Technology Data Exchange (ETDEWEB)

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  6. Analyzing the contributions of a government-commissioned research project: A case study

    NARCIS (Netherlands)

    Hegger, I.; Janssen, S.W.J.; Keijsers, J.F.E.M.; Schuit, A.J.; Oers, H.A.M. van

    2014-01-01

    Background: It often remains unclear to investigators how their research contributes to the work of the commissioner. We initiated the 'Risk Model' case study to gain insight into how a Dutch National Institute for Public Health and the Environment (RIVM) project and its knowledge products

  7. Review and evaluation of the Nuclear Regulatory Commission Safety Research Program for Fiscal Years 1984 and 1985

    International Nuclear Information System (INIS)

    1983-02-01

    This is the sixth report by the Advisory Committee on Reactor Safeguards (ACRS) that has been prepared in response to the Congressional requirement for an annual report on the Nuclear Regulatory Commission (NRC) Reactor Safety Research Program. Part I is a compilation of our general comments and recommendations regarding the NRC Safety Research Program, and includes budget recommendations and an identification of matters of special importance that deserve increased emphasis. It is intended to serve as an Executive Summary. Part II is divided into ten chapters, each of which represents a Decision Unit of the NRC research program. In each chapter, specific comments are included on the research involved in the Decision Unit, an assessment of priorities, and recommendations regarding new directions and levels of funding

  8. Analyzing the contributions of a government-commissioned research project : A case study

    NARCIS (Netherlands)

    Hegger, I.; Janssen, S.W.J.; Keijsers, J.F.E.M.; Schuit, A.J.; van Oers, J.A.M.

    2014-01-01

    Background It often remains unclear to investigators how their research contributes to the work of the commissioner. We initiated the ‘Risk Model’ case study to gain insight into how a Dutch National Institute for Public Health and the Environment (RIVM) project and its knowledge products contribute

  9. Anxious Behaviors of Patrons of an X-Rated Movie: An Update of the Winick Study for the Commission on Obscenity and Pornography.

    Science.gov (United States)

    Copeland, Gary A.; Davis, Donald M.

    A study examined the behavior patterns of patrons arriving at theatres that showed both "X" rated and "PG" rated movies. The study was undertaken to update the findings of the President's Commission on Pornography and Obscenity, which conducted similar research in 1970 and 1971. Patrons entering the theatre's X and PG rated…

  10. 77 FR 61608 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2012-10-10

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Public Meeting of the Presidential Commission for the Study of Bioethical Issues AGENCY: Department of Health and Human Services, Office of the Assistant... leaders in medicine, science, ethics, religion, law, and engineering. The Commission advises [[Page 61609...

  11. 77 FR 76042 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2012-12-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Public Meeting of the Presidential Commission for the Study of Bioethical Issues AGENCY: Department of Health and Human Services, Office of the Assistant..., religion, law, and engineering. The Commission advises the President on bioethical issues arising from...

  12. Redesign and commissioning of sexual health services in England - a qualitative study.

    Science.gov (United States)

    Walker, I F; Leigh-Hunt, N; Lee, A C K

    2016-10-01

    Responsibility for the commissioning of sexual and reproductive health (SRH) services transferred from the National Health Service to local authorities in England in 2013. This transfer prompted many local authorities to undertake new procurements of these SRH services. This study was undertaken to capture some of the lessons learnt in order to inform future commissioning and system redesign. A qualitative study was carried out involving semi-structured interviews. Interviews were conducted with 13 local authority sexual health commissioners in Yorkshire and the Humber from 11 interviews. Thematic analysis was used to identify themes from transcripts of the interviews with the 13 participants. Key themes identified were as follows: the challenge and complexity to those new to clinical commissioning; the prerequisites of robust infrastructural inputs to undertake the process, including technical expertise, a dependable project team, with clarity over the timescales and the budget; the requirement for good governance, stakeholder engagement and successful management of relationships with the latter; and the need to focus on the outcomes, aiming for value for money and improved system performance. Several key issues emerged from our study that significantly influenced the outcome of the redesign and commissioning process for sexual health services. An adapted model of the Donabedian evaluation framework was developed to provide a tool to inform future system redesign. Our model helps identify the key determinants for successful redesign in this context which is essential to both mitigate potential risks and maximize the likelihood of successful outcomes. Our model may have wider applications. Copyright © 2016 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.

  13. A brief review of some pathology research supported by the Georgia Commodity Commission for Pecans at the USDA-ARS, Byron

    Science.gov (United States)

    With the changes currently taking place nationally in the pecan industry, and the production issues faced specifically by growers in Georgia and elsewhere in the southeastern region, the pathology research projects funded by the Georgia Commodity Commission for Pecans (CC) are reviewed. The results ...

  14. 75 FR 52533 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2010-08-26

    ... bioethical, legal, and social issues related to potential scientific and technological advances; examine... of public policy with regard to this advancing science. The Commission also will hear more from the... Science, The Presidential Commission for the Study of Bioethical Issues. ACTION: Notice of meeting...

  15. The fast breeder studies for the Enquete Commission of the German Bundestag

    International Nuclear Information System (INIS)

    Marth, W.

    1982-01-01

    The Enquete Commission 'future nuclear energy policy' of the German Bundestag had ordered two studies in its first report which was to serve as a basis for its discussions on the commissioning of the SNR 300. The result of the so-called upper-limit study was that, in case of a Bethe-Tait failure, i.e. an energetic excursion of performance, the upper limit of 370 MW determined by the licensing procedure for the SNR 300 is not exceeded. It can be concluded from the risk-orientated analysis that the environmental risk of the SNR 300 must be rated lower than that of a 1300 MWe pressurized water reactor. The results of these studies are supported by well-known scientists; the so-called 'critical scientists' arrive at opposite consequences. (orig.) [de

  16. The practice of commissioning healthcare from a private provider: learning from an in-depth case study.

    Science.gov (United States)

    Chambers, Naomi; Sheaff, Rod; Mahon, Ann; Byng, Richard; Mannion, Russell; Charles, Nigel; Exworthy, Mark; Llewellyn, Sue

    2013-01-01

    The direction of health service policy in England is for more diversification in the design, commissioning and provision of health care services. The case study which is the subject of this paper was selected specifically because of the partnering with a private sector organisation to manage whole system redesign of primary care and to support the commissioning of services for people with long term conditions at risk of unplanned hospital admissions and associated service provision activities. The case study forms part of a larger Department of Health funded project on the practice of commissioning which aims to find the best means of achieving a balance between monitoring and control on the one hand, and flexibility and innovation on the other, and to find out what modes of commissioning are most effective in different circumstances and for different services. A single case study method was adopted to explore multiple perspectives of the complexities and uniqueness of a public-private partnership referred to as the "Livewell project". 10 single depth interviews were carried out with key informants across the GP practices, the PCT and the private provider involved in the initiative. The main themes arising from single depth interviews with the case study participants include a particular understanding about the concept of commissioning in the context of primary care, ambitions for primary care redesign, the importance of key roles and strong relationships, issues around the adoption and spread of innovation, and the impact of the current changes to commissioning arrangements. The findings identified a close and high trust relationship between GPs (the commissioners) and the private commissioning support and provider firm. The antecedents to the contract for the project being signed indicated the importance of leveraging external contacts and influence (resource dependency theory). The study has surfaced issues around innovation adoption in the healthcare context

  17. Commission errors of active intentions: the roles of aging, cognitive load, and practice.

    Science.gov (United States)

    Boywitt, C Dennis; Rummel, Jan; Meiser, Thorsten

    2015-01-01

    Performing an intended action when it needs to be withheld, for example, when temporarily prescribed medication is incompatible with the other medication, is referred to as commission errors of prospective memory (PM). While recent research indicates that older adults are especially prone to commission errors for finished intentions, there is a lack of research on the effects of aging on commission errors for still active intentions. The present research investigates conditions which might contribute to older adults' propensity to perform planned intentions under inappropriate conditions. Specifically, disproportionally higher rates of commission errors for still active intentions were observed in older than in younger adults with both salient (Experiment 1) and non-salient (Experiment 2) target cues. Practicing the PM task in Experiment 2, however, helped execution of the intended action in terms of higher PM performance at faster ongoing-task response times but did not increase the rate of commission errors. The results have important implications for the understanding of older adults' PM commission errors and the processes involved in these errors.

  18. TH-AB-201-10: Portal Dosimetry with Elekta IViewDose:Performance of the Simplified Commissioning Approach Versus Full Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Kydonieos, M; Folgueras, A; Florescu, L; Cybulski, T; Marinos, N; Thompson, G; Sayeed, A [Elekta Limited, Crawley, West Sussex (United Kingdom); Rozendaal, R; Olaciregui-Ruiz, I [Netherlands Cancer Institute - Antoni van Leeuwenhoek, Amsterdam, Noord-Holland (Netherlands); Subiel, A; Patallo, I Silvestre [National Physical Laboratory, London (United Kingdom)

    2016-06-15

    Purpose: Elekta recently developed a solution for in-vivo EPID dosimetry (iViewDose, Elekta AB, Stockholm, Sweden) in conjunction with the Netherlands Cancer Institute (NKI). This uses a simplified commissioning approach via Template Commissioning Models (TCMs), consisting of a subset of linac-independent pre-defined parameters. This work compares the performance of iViewDose using a TCM commissioning approach with that corresponding to full commissioning. Additionally, the dose reconstruction based on the simplified commissioning approach is validated via independent dose measurements. Methods: Measurements were performed at the NKI on a VersaHD™ (Elekta AB, Stockholm, Sweden). Treatment plans were generated with Pinnacle 9.8 (Philips Medical Systems, Eindhoven, The Netherlands). A farmer chamber dose measurement and two EPID images were used to create a linac-specific commissioning model based on a TCM. A complete set of commissioning measurements was collected and a full commissioning model was created.The performance of iViewDose based on the two commissioning approaches was compared via a series of set-to-work tests in a slab phantom. In these tests, iViewDose reconstructs and compares EPID to TPS dose for square fields, IMRT and VMAT plans via global gamma analysis and isocentre dose difference. A clinical VMAT plan was delivered to a homogeneous Octavius 4D phantom (PTW, Freiburg, Germany). Dose was measured with the Octavius 1500 array and VeriSoft software was used for 3D dose reconstruction. EPID images were acquired. TCM-based iViewDose and 3D Octavius dose distributions were compared against the TPS. Results: For both the TCM-based and the full commissioning approaches, the pass rate, mean γ and dose difference were >97%, <0.5 and <2.5%, respectively. Equivalent gamma analysis results were obtained for iViewDose (TCM approach) and Octavius for a VMAT plan. Conclusion: iViewDose produces similar results with the simplified and full commissioning

  19. 76 FR 7853 - Patient Safety Organizations: Voluntary Delisting From Oregon Patient Safety Commission

    Science.gov (United States)

    2011-02-11

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Agency for Healthcare Research and Quality Patient Safety Organizations: Voluntary Delisting From Oregon Patient Safety Commission AGENCY: Agency for Healthcare Research and Quality (AHRQ), HHS. ACTION: Notice of delisting. SUMMARY: Oregon Patient Safety Commission: AHRQ...

  20. Danish Atomic Energy Commission 1974/75

    International Nuclear Information System (INIS)

    1975-11-01

    Activities of the Danish Atomic Energy Commission and the Risoe eesearch Establishment for the period April1, 1974 to March 31, 1975 are summarized. The operations of the various facilities at the Research Establishment are revised. Operating staff levels and financial data are tabulated, a selected list of staff publications is given, and the design data on research facilities are presented. (B.P.)

  1. Selection, follow-up, and analysis in the Atomic Bomb Casualty Commission Study

    International Nuclear Information System (INIS)

    Jablon, S.

    1985-01-01

    More is known about ionizing radiation as a cause of human cancer than about any other carcinogen. Most of this knowledge is derived from the studies conducted by the Atomic Bomb Casualty Commission and Radiation Effects Research Foundation on about 100,000 Japanese survivors of the atomic bombing in 1945. The importance of these studies is based on the large size of the exposed population and the fact that individual estimates of radiation dose were possible. These factors and the combined excellence of the centralized vital statistics reporting and population registration systems in Japan have made feasible the continuing longitudinal studies of cancer mortality by site in relation to radiation dose over a span of more than 30 years. Excellent voluntary cooperation by the survivors has enabled the continuation of a biennial physical examination program which has made possible the acquisition of blood for studies of radiation-induced chromosomal aberrations and mutations at the level of specific genes. Similarly, with the cooperation of local universities, hospitals, and physicians, tumor and tissue registries necessary for the study of cancer incidence have been developed. An autopsy pathology program has enabled study of the accuracy of cause of death certification

  2. Managing resources in NHS dentistry: using health economics to inform commissioning decisions

    Directory of Open Access Journals (Sweden)

    Exley Catherine E

    2011-05-01

    Full Text Available Abstract Background The aim of this study is to develop, apply and evaluate an economics-based framework to assist commissioners in their management of finite resources for local dental services. In April 2006, Primary Care Trusts in England were charged with managing finite dental budgets for the first time, yet several independent reports have since criticised the variability in commissioning skills within these organisations. The study will explore the views of stakeholders (dentists, patients and commissioners regarding priority setting and the criteria used for decision-making and resource allocation. Two inter-related case studies will explore the dental commissioning and resource allocation processes through the application of a pragmatic economics-based framework known as Programme Budgeting and Marginal Analysis. Methods/Design The study will adopt an action research approach. Qualitative methods including semi-structured interviews, focus groups, field notes and document analysis will record the views of participants and their involvement in the research process. The first case study will be based within a Primary Care Trust where mixed methods will record the views of dentists, patients and dental commissioners on issues, priorities and processes associated with managing local dental services. A Programme Budgeting and Marginal Analysis framework will be applied to determine the potential value of economic principles to the decision-making process. A further case study will be conducted in a secondary care dental teaching hospital using the same approach. Qualitative data will be analysed using thematic analysis and managed using a framework approach. Discussion The recent announcement by government regarding the proposed abolition of Primary Care Trusts may pose challenges for the research team regarding their engagement with the research study. However, whichever commissioning organisations are responsible for resource allocation

  3. Nine centuries waiting: The experiences of Iranians surrogacy commissioning mothers.

    Science.gov (United States)

    Zandi, Mitra; Vanaki, Zohreh; Shiva, Marziyeh; Mohammadi, Eesa

    2014-05-01

    There are a few studies about commissioning mothers' understanding from the surrogacy during 9 months of waiting for delivery in Iran and other countries. This study was conducted with an aim to explore and explain the nature of concerns (experiences) of commissioning mothers. A qualitative design with a conventional content analysis approach was used to gather and analyze the experiences of commissioning mothers. They were selected from Royan Research Centre and other infertility centers in Iran. After purposive sampling for the selection of the participants, unstructured interviews were held for data collection. Twenty-four unstructured interviews were conducted with 12 commissioning mothers, 2 surrogate mothers, and 2 infertility center social workers who directly and continuously dealt with these mothers. TWO MAIN THEMES EMERGED FROM THE DATA ANALYSIS: 1. cultural dilemma (consisting of three subthemes: Social taboo, concerns about disclosure to others and the child, concerns about altering maternal and child's identity, and 2. uncertain waiting (consisting of three subthemes: Concerns about health of fetus and surrogate, concerns about an unfamiliar surrogate, and concerns about lack of preparation for maternal role). The study reveals the importance of maternal emotional care in this group and introduces a new arena for nurses' activity. These findings help the mothers by nurses' activities in health care clinics and anywhere they deliver nursing care.

  4. Nine centuries waiting: The experiences of Iranians surrogacy commissioning mothers

    Science.gov (United States)

    Zandi, Mitra; Vanaki, Zohreh; Shiva, Marziyeh; Mohammadi, Eesa

    2014-01-01

    Background: There are a few studies about commissioning mothers’ understanding from the surrogacy during 9 months of waiting for delivery in Iran and other countries. This study was conducted with an aim to explore and explain the nature of concerns (experiences) of commissioning mothers. Materials and Methods: A qualitative design with a conventional content analysis approach was used to gather and analyze the experiences of commissioning mothers. They were selected from Royan Research Centre and other infertility centers in Iran. After purposive sampling for the selection of the participants, unstructured interviews were held for data collection. Twenty-four unstructured interviews were conducted with 12 commissioning mothers, 2 surrogate mothers, and 2 infertility center social workers who directly and continuously dealt with these mothers. Results: Two main themes emerged from the data analysis: 1. cultural dilemma (consisting of three subthemes: Social taboo, concerns about disclosure to others and the child, concerns about altering maternal and child's identity, and 2. uncertain waiting (consisting of three subthemes: Concerns about health of fetus and surrogate, concerns about an unfamiliar surrogate, and concerns about lack of preparation for maternal role). Conclusions: The study reveals the importance of maternal emotional care in this group and introduces a new arena for nurses’ activity. These findings help the mothers by nurses’ activities in health care clinics and anywhere they deliver nursing care. PMID:24949058

  5. Commission of the European Communities - Review of fast reactor activities, March 1979

    International Nuclear Information System (INIS)

    Balz, W.

    1979-01-01

    The Commission of the European Communities pursued its activities on the lines described earlier. Besides the execution of a research programme in its Joint Research Centre the Commission endeavoured to support the development and demonstration of fast reactors. Most of the latter activities were performed in the frame of the Fast Reactor Coordinating Committee

  6. Report of nuclear utility industry responses to Kemeny Commission recommendations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-02-15

    The purpose of this paper is to provide a report of nuclear utility industry progress in responding to the recommendations of the President's Commission on the Accident at Three Mile Island (The Kemeny Commission). On April 11, 1979, in response to TMI, President Carter established a Commission to conduct '.... a comprehensive study and investigation of the recent accident involving the nuclear power facility on Three Mile Island in Pennsylvania'. The Commission was chaired by Dr. John G. Kemeny, then President of Dartmouth College. (A list of all members of The Kemeny Commission is provided in Attachment to the Appendix ). The report of the commission's findings and recommendations was transmitted to the President in October 1979. During this same period, the nuclear utility industry responded to TMI by creating the Institute of Nuclear Power Operations (INPO) with a mission to promote the highest levels of safety and reliability - to promote excellence - in the operation of nuclear electric generating plants. In addition, the Nuclear Safety Analysis Center (NSAC) was established at the Electric Power Research Institute (EPRI to evaluate the accident and assist in determining the best industry response. In a White House paper (and press release) of December 7 1979, the President announced that he agreed fully with the spirit and intent of al the Kemeny Commission recommendations and requested that the industry and The Nuclear Regulatory Commission (NRC) comply with the recommendations. The President also recognized the industry initiative in establishing INPO and called for several actions involving the Institute; the President directed the Department of Energy and other government agencies to provide assistance to INPO and the industry. An overall status of the nuclear utility industry responses to Kemeny Commission recommendations in the key areas directly related to nuclear plant operations is provided below. A more detailed status of industry responses to the

  7. Report of nuclear utility industry responses to Kemeny Commission recommendations

    International Nuclear Information System (INIS)

    1989-02-01

    The purpose of this paper is to provide a report of nuclear utility industry progress in responding to the recommendations of the President's Commission on the Accident at Three Mile Island (The Kemeny Commission). On April 11, 1979, in response to TMI, President Carter established a Commission to conduct '.... a comprehensive study and investigation of the recent accident involving the nuclear power facility on Three Mile Island in Pennsylvania'. The Commission was chaired by Dr. John G. Kemeny, then President of Dartmouth College. (A list of all members of The Kemeny Commission is provided in Attachment to the Appendix ). The report of the commission's findings and recommendations was transmitted to the President in October 1979. During this same period, the nuclear utility industry responded to TMI by creating the Institute of Nuclear Power Operations (INPO) with a mission to promote the highest levels of safety and reliability - to promote excellence - in the operation of nuclear electric generating plants. In addition, the Nuclear Safety Analysis Center (NSAC) was established at the Electric Power Research Institute (EPRI to evaluate the accident and assist in determining the best industry response. In a White House paper (and press release) of December 7 1979, the President announced that he agreed fully with the spirit and intent of al the Kemeny Commission recommendations and requested that the industry and The Nuclear Regulatory Commission (NRC) comply with the recommendations. The President also recognized the industry initiative in establishing INPO and called for several actions involving the Institute; the President directed the Department of Energy and other government agencies to provide assistance to INPO and the industry. An overall status of the nuclear utility industry responses to Kemeny Commission recommendations in the key areas directly related to nuclear plant operations is provided below. A more detailed status of industry responses to the

  8. Commissioning MMS

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  9. Compressor Load Stand: Commissioning and Control Strategies

    National Research Council Canada - National Science Library

    Causey, Andrew

    1998-01-01

    .... The purpose of this research project was to commission this load stand, which includes setting up the hardware, setting up a control system, a data acquisition system, and an automatic test sequence system...

  10. Features of successful bids for funding of applied health research: a cohort study.

    Science.gov (United States)

    Turner, Sheila; Davidson, Peter; Stanton, Louise; Cawdeary, Victoria

    2014-09-22

    The literature suggests that research funding decisions may be influenced by criteria such as gender or institution of the principal investigator (PI). The aim of this study was to investigate the association between characteristics of funding applications and success when considered by a research funding board. We selected a retrospective cohort of 296 outline applications for primary research (mainly pragmatic clinical trials) submitted to the commissioning board of the National Institute for Health Research (NIHR) Health Technology Assessment (HTA) Programme between January 1st 2006 and December 31st 2009. We selected proposals submitted to the commissioned NIHR HTA work stream as they addressed issues which the programme already deemed to be important, hence the priority of the research question was not considered as one of the selection criteria for success or failure. Main outcome measures were success or failure at short-listing and in obtaining research funding. The characteristics of applications associated with success at shortlisting and funding were multi-disciplinarity of the team (OR 19.94 [5.13, 77.50], P research applications most strongly associated with success were related to the range of expertise in the team and the completion of a pilot or feasibility study.

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services

  12. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  13. 'Animateurs' and animation: what makes a good commissioning manager?

    Science.gov (United States)

    Checkland, Kath; Snow, Stephanie; McDermott, Imelda; Harrison, Stephen; Coleman, Anna

    2012-01-01

    To examine the managerial behaviours adopted by commissioning managers in English primary care trusts (PCTs), and to explore the impact of these behaviours. Qualitative case studies were undertaken in four PCTs, focusing on staff engaged in the commissioning of hospital services. Both formal and informal observation were undertaken (150 hours), and 41 in-depth interviews conducted with managers and general practitioners (GPs). Managers adopted many managerial behaviours familiar from the literature, including sharing information, and networking inside and outside the organization. Multiple organizational layers and unclear decision-making processes hindered this activity. In addition, some managers with responsibility for facilitating practice-based commissioning (PbC) adopted a managerial mode that we have called being an 'animateur'. This approach involved the active management of disparate groups of people over whom the manager had no authority, and appeared to be a factor in determining success. It was facilitated by managerial autonomy and was more prevalent where managers were seen to have legitimacy. Some organizational practices appeared to inhibit its development. From 2012/13 it is planned that GPs will be taking more responsibility for commissioning in the English NHS. This research suggests that managers of the new commissioning organizations will require a deep and contextualized understanding of the NHS and that it is important that organizational processes do not inhibit managerial behaviour. Legitimacy may be an issue in contexts were managers are automatically transferred from their existing appointments.

  14. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  15. Division B Commission 40: Radio Astronomy

    NARCIS (Netherlands)

    Chapman, Jessica M.; Giovaninni, Gabriele; Taylor, Russell; Carilli, Christopher; Hills, Richard; Hirabayashi, Hisashi; Jonas, Justin L.; Lazio, Joseph; Morganti, Raffaella; Nan, Rendong; Rubio, Monica; Shastri, Prjaval; Kellermann, Ken; Ekers, Ronald; Ohishi, Masatoshi

    2016-01-01

    IAU Commission 40 for Radio Astronomy (hereafter C40) brought together scientists and engineers who carry out observational and theoretical research in radio astronomy and who develop and operate the ground and space-based radio astronomy facilities and instrumentation. As of June 2015, the

  16. FRM-II research neutron source commissioned

    International Nuclear Information System (INIS)

    Anon.

    2004-01-01

    On March 2, 2004, the Heinz Maier-Leibnitz research neutron source (FRM-II) generated neutrons for the first time. This marked the most important step on the way to using FRM-II for scientific purposes. On this occasion, this unique research facility in the world was dedicated in a ceremony attended by approximately 1000 representatives of politics, industry, and science. The keynote speaker, Federal Minister of the Interior Otto Schily; Bavarian Minister President Edmund Stoiber; Professor Claus Weyrich (Member of the Executive Board of Siemens AG); Dr. Thomas Goppel (Bavarian State Minister for Science, Research, and Arts); Professor Wolfgang A. Herman (President of the Technical University of Munich); Hannelore Gabor (2nd Mayor of the host municipality of Garching); and Professor Winfried Petry (Scientific Director of FRM-II) underlined the great importance of FRM-II for science, research, medicine, and technology. FRM-II will not only fill the 'neutron gap', but create extremely brilliant working conditions thanks to its considerably higher neutron flux compared to that of its predecessor, the legendary Atomic Egg. After the first conceptual design studies starting in 1980, the ground breaking ceremony in August 1996, and the third partial permit issued at Easter of 2003, a unique tool is now available for modern science and for medical and technical applications. (orig.) [de

  17. Status report on research programmes of the Commission of European Communities related to risk evaluation of geological disposal of radioactive waste

    International Nuclear Information System (INIS)

    Girardi, F.

    1977-01-01

    The programmes of the Commission of European Communities related to risk evaluation of geological disposal of radioactive waste are presented. The Joint Research Centre carries out theoretical modelling activities and a few selected experimental activities which are related to model development and verification. A set of contractual research activities, coordinated by the General Directorate of Research, Scientific Affairs and Education and set up primarily to encourage development of optimised waste management strategies will provide the many additional experimental data which are necessary for a realistic evaluation of long term hazard to man and the environment

  18. Philippine Atomic Energy Commission: Annual report 1983

    International Nuclear Information System (INIS)

    1984-01-01

    This publication gives the highlights of the research and development projects of the Philippine Atomic Energy Commission in agriculture and food, nuclear fuels and power system technology, medicine, public health and nutrition, environmental surveillance, supportive basic research, social response to nuclear technology, nuclear licensing and safeguards, supportive technology and international and local linkages including manpower development. (ELC)

  19. Curriculum for Commissioning Energy Efficient Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Webster, Lia [Portland Energy Conservation, Inc., OR (United States)

    2012-12-27

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual

  20. Commissioning of radiotherapy treatment planning systems: Testing for typical external beam treatment techniques. Report of the Coordinated Research Project (CRP) on Development of Procedures for Quality Assurance of Dosimetry Calculations in Radiotherapy

    International Nuclear Information System (INIS)

    2008-01-01

    users at the hospitals. Commissioning is one of the most important parts of the entire QA programme for both the RTPS and the planning process. Commissioning involves testing of system functions, documentation of the different capabilities and verification of the ability of the dose calculation algorithms to reproduce measured dose calculations. The current report is limited to treatment simulation tests for external high-energy photon beams that are performed prior to clinical use of RTPS. The report deals with the verification of the dose calculations through commissioning tests that cover typical treatment techniques only. This report also summarizes the results of a pilot study of the clinical commissioning recommendations that was performed by the participants of the Coordinated Research Project at their home institutions. The summary of the pilot study is available to medical physicists as an example of the implementation of the clinical commissioning procedures for RTPSs at their hospitals. Issues related to intensity modulated radiation therapy (IMRT) or other specialized techniques such as stereotactic radiosurgery are not addressed in this clinical commissioning report. While recognizing the specific scope of this report, this publication is useful to the purchasers of RTPSs in any country although they may have to perform tests beyond those described in this report to meet the needs of specialized techniques that have not been addressed here

  1. Rehabilitation robotics in robotics for healthcare ; a roadmap study for the European Commission

    NARCIS (Netherlands)

    Gelderblom, G.J.; Wilt, M.de; Cremers, G.; Rensma, A.R.

    2009-01-01

    To gain understanding in the current status of Robotics in healthcare the European Commission issued a roadmap study into this domain. This paper reports on the main characteristics and results of this study. The study covered the wide domain of Healthcare and in this paper the domains relevant for

  2. Commissioning (Phases 4, 4A, 4B)

    National Research Council Canada - National Science Library

    Schofield, Andrew

    1997-01-01

    Phase 4 marked the completion of ANS&A's commitments under the BAA, as the new large centrifuge at the Waterways Experiment Station was commissioned and a series of research experiments were undertaken to demonstrate the breadth of new...

  3. National Bioethics Commissions as Educators.

    Science.gov (United States)

    Lee, Lisa M

    2017-05-01

    As has become tradition, executive directors of United States' presidential bioethics committees offer reflections about their experience shortly after the orderly shutdown of the commission staff. After the records are filed according to government records regulations; after all the staff members, who are hired into temporary positions that must be renewed every two years, have secured permanent employment; after preparations are made to ensure that the next commission staff (should there be one) has a budget and standard operating procedures in order to begin its work in a timely manner; after the lights are turned out for the last time, the executive director makes the final climb up the stairs into the sunlight and reflects on the whirlwind. There is much about my work with the Presidential Commission for the Study of Bioethical Issues that deserves comment, but one aspect of the commission that has been especially valuable to me is its work to educate the nation on bioethical issues. This is, moreover, a contribution in which the commission staff was central, and it is one that, as an ethics educator myself, I will cherish deeply. © 2017 The Hastings Center.

  4. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Science.gov (United States)

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  5. Commissioning of the new heat exchanger for the research nuclear reactor IEA-R1

    Energy Technology Data Exchange (ETDEWEB)

    Castro, Alfredo Jose Alvim de; Cassiano, Douglas Alves; Umbehaun, Pedro Ernesto; Carvalho, Marcos Rodrigues de; Frajndlich, Roberto [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)]. E-mails: ajcastro@ipen.br; docass@gmail.com.br; umbehaun@ipen.br; carvalho@ipen.br; frajndli@ipen.br

    2008-07-01

    The Research Reactor IEA-R1 placed at IPEN/CNEN-SP is of the swimming pool type, light water moderated and with graphite reflectors, and was build and designed by Babcock and Wilcox Co. Start up operation was in September the 16{sup th}, 1957, being the first criticality for South Hemisphere. Although designed to operate at 5 MW, the IEA-R1 was operated until 2001 with 2 MW and was suitable for use in basic and applied research as well as the production of medical radioisotopes, industry and natural sciences applications. Due to a recent demand increase on radioisotopes in Brazil for medical diagnoses and therapies applications, IPEN /CNEN updated the IEA-R1 power to 5 MW and to work at continuous operation regime. Studies on the Ageing Management for the Research Reactor IEA-R1 were conducted according to IAEA procedures. As result of these studies critical components within the Ageing Management Program were identified. Also were made recommendations on the implementation of test scheduling and standardization procedures to organize data and documents. One of the main results was the need of monitoring the two heat exchangers, the two primary circuit pumps and the data acquisition system. During monitoring procedures, issues were observed on the IEA-R1 operation at 5 MW mainly due to the ageing of the Babcox and Wilcox TCA heat exchanger, and excessive vibrations at high flow rates on CBC's TCB heat exchanger. So, from 2005 on, it was decided to work with 3,5 MW and provide a new IESA heat exchanger with 5 MW capacity, to substitute the TCA heat exchanger. This work presents results on the commissioning of the new heat exchanger and compares against the values calculated in the IESA project. The results show that the IEA-R1 Reactor can be operated more safety and continuously at 5 MW with the new IESA heat exchanger. (author)

  6. Is woodfuel a strategic issue for the Forestry Commission?

    International Nuclear Information System (INIS)

    Simpson, James

    2000-01-01

    The chapter allows us to answer the question: Is wood fuel a strategic issue for the Forestry Commission? The key points are that: Wood fuel is a strategic issue for the Forestry Commission; Wood fuel is a forest product which can be obtained from both short and long rotation woodlands. Although demand at an industrial scale is relatively low at present there appear to be good prospects for an increase in the near future; The silvicultural systems and forest operations which are employed in the production of wood fuel must be compatible with the UK Forestry Standard and must take account of economic, environmental and social sustainability; The Forestry Commission, as the lead department in GB forestry matters, uses a range of mechanisms in the promotion of sustainable forest management. Many of these are directly applicable to the production of wood fuel; The Forestry Commission's approach to funding research on silvicultural systems and forest operations is based on the identification and removal of barriers which appear to be standing in the way of sustainable forest management. The wood fuel industry could be far more significant to forest management than it is today and this has implications for our research programme. (Author)

  7. Niger Delta Development Commission and Sustainable ...

    African Journals Online (AJOL)

    Niger Delta Development Commission and Sustainable Development of Niger Delta Region of Nigeria: The Case of Rivers State. Goddey Wilson. Abstract. The study is on Niger Delta Development Commission and sustainable development of Niger Delta region of Nigeria, the case of Rivers State. The main objective of the ...

  8. Guidelines for residential commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  9. Studies for the Commissioning of the CERN CMS Silicon Strip Tracker

    CERN Document Server

    Bloch, Christoph; Abbaneo, Duccio; Fabjan, Christian Wolfgang

    2008-01-01

    In 2008 the Large Hadron Collider (LHC) at CERN will start producing proton-proton collisions of unprecedented energy. One of its main experiments is the Compact Muon Solenoid (CMS), a general purpose detector, optimized for the search of the Higgs boson and super symmetric particles. The discovery potential of the CMS detector relies on a high precision tracking system, made of a pixel detector and the largest silicon strip Tracker ever built. In order to operate successfully a device as complex as the CMS silicon strip Tracker, and to fully exploit its potential, the properties of the hardware need to be characterized as precisely as possible, and the reconstruction software needs to be commissioned with physics signals. A number of issues were identified and studied to commission the detector, some of which concern the entire Tracker, while some are specific to the Tracker Outer Barrel (TOB): - the time evolution of the signals in the readout electronics need to be precisely measured and correctly simulate...

  10. Introductory user's manual for the US Nuclear Regulatory Commission Reactor Safety Research Data Bank

    International Nuclear Information System (INIS)

    Scofield, N.R.; Hardy, H.A.; Laats, E.T.

    1983-02-01

    The United States Nuclear Regulatory Commission (NRC) has established the NRC/Division of Accident Evaluation (DAE) Data Bank Program to collect, store, and make available data from the many domestic and foreign water safety research programs. Local direction of the program is provided by E G and G Idaho, Inc., prime contractor for the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL). The NRC/DAE Data Bank Program provides a central computer storage mechanism and access software for data that is to be used by code development and assessment groups in meeting the code and correlation needs of the nuclear industry. The administrative portion of the program provides data entry, documentation, training, and advisory services to users and the NRC. The NRC/DAE Data Bank and the capabilities of the data access software are described

  11. Scientific management of the commissioning of the Temelin NPP

    International Nuclear Information System (INIS)

    Pazdera, F.; Vasa, I.; Svoboda, C.

    2002-01-01

    A Scientific Supervisory Group (SSG) for the commissioning of the Temelin nuclear power plant was set up by the statutory body of CEZ, a.s. (utility which holds responsibility for the start-up of the plant pursuant to Act No. 18/1997). The SSG provides support to the operator through expertise in nuclear safety assurance and nuclear power plant commissioning. Nuclear Research Institute Rez plc was appointed to this function. The article gives the definition and explains the statute of the SSG, highlights its main tasks and responsibilities, and presents the main results of activities of the SSG. The mission of the International Scientific Council for the Commissioning of the Temelin NPP is also briefly outlined. (author)

  12. Making the Choices Necessary to Make a Difference: The Responsibility of National Bioethics Commissions.

    Science.gov (United States)

    Grady, Christine

    2017-05-01

    In this essay, I offer some reflections on how the topics were identified and approached by the Presidential Commission for the Study of Bioethical Issues, on which I had the honor to serve, in the hope that the reflections may be useful to future national bioethics commissions. In the executive order that established the bioethics commission, President Obama explicitly recognized the ethical imperative to responsibly pursue science, innovation, and advances in biomedical research and health care, and the importance of national attention to these issues. The bioethics commission prioritized practicable, actionable, targeted recommendations. Like most earlier U.S. national bioethics commissions, President Obama's commission did not undertake projects on significant and troublesome issues related to health and health care that were not associated with new science or technology. Issues such as health care access, health care delivery, opioid addiction, end-of-life care, and physician-aid-in-dying are topical and ethically complex areas of significance to bioethics, and they are also being discussed and debated by the public, the media, and policy-makers. In my view, there are good reasons to select and prioritize projects as well as a justification for confining commission efforts to issues related to novel science and emerging technologies, when there is only one national-level bioethics commission that has been established by the Office of the President. © 2017 The Hastings Center.

  13. Methodological Appendix of Research Methods Employed in the Mexican American Education Study.

    Science.gov (United States)

    Commission on Civil Rights, Washington, DC.

    The U.S. Commission on Civil Rights released Mexican American Education Study findings in a series of documents: (1) "The Ethnic Isolation of Mexican Americans in the Public Schools of the Southwest" (ED 052 849), "The Unfinished Education" (ED 056 821), and "The Excluded Student" (ED 062 069). The research methods employed in the study are…

  14. 78 FR 32295 - Commission Meeting

    Science.gov (United States)

    2013-05-29

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: June 20...

  15. 77 FR 10599 - Commission Meeting

    Science.gov (United States)

    2012-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 15...

  16. 78 FR 12412 - Commission Meeting

    Science.gov (United States)

    2013-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 21...

  17. 78 FR 52601 - Commission Meeting

    Science.gov (United States)

    2013-08-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: September 19, 2013...

  18. 77 FR 70204 - Commission Meeting

    Science.gov (United States)

    2012-11-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the SUPPLEMENTARY INFORMATION section of this notice. DATES: December 14, 2012...

  19. 78 FR 69517 - Commission Meeting

    Science.gov (United States)

    2013-11-19

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: December 12, 2013...

  20. 77 FR 52106 - Commission Meeting

    Science.gov (United States)

    2012-08-28

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: September 20...

  1. The Commission on Employment Conditions, an ambitious undertaking !

    CERN Multimedia

    Staff Association

    2010-01-01

    Since the beginning of the year, the Commission on Employment Conditions has had much success in the number and ability of its participants. It has mostly worked on salaries, the only compulsory subject of the 2010 five-yearly review. In the framework of this review, the Commission has analysed the results of the comparison carried out by the OECD (see Echo 104 and 105). Through its research and analysis, the Commission has clearly shown that our salaries are lower than those of the comparators. It is there necessary to adjust the salary grid with a salary catch-up and not an increase. In 20 years, no five-yearly review has ended with a significant catch-up. Today it is essential to inform our colleagues that this subject needs to be dealt with and that measures must be taken to finance it, as is the case for restoring the equilibrium of the Pension Fund and Health Insurance schemes. The Commission has established an argumentation to help our fellow delegates talk about the delicate subject of salary catch-...

  2. The initial criticality and nuclear commissioning test program at HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Choong-Sung; Seo, Chul-Gyo; Jun, Byung-Jin [Korea Atomic Energy Research Institute, Dukjin-Dong 150, Yusung-Ku, Taejon, 305-353 (Korea, Republic of)

    1995-07-01

    The construction of the Korea Multipurpose Research Reactor - HANARO of 3MW, developed by Korea Atomic Energy Research Institute, was completed at the beginning of this year. The first fuel loading began on February 2 1995, and initial criticality was achieved on February 8, when the core had four 18-element assemblies and thirteen 36-element assemblies. The critical control rod position was 600.8 mm which represents excess reactivity of 0.71 $. Currently the nuclear commissioning test is on going under the zero power range. This paper describes the initial criticality approach of the HANARO, and its nuclear commissioning test program. (author)

  3. History of the Atomic Energy Commission

    International Nuclear Information System (INIS)

    Buck, A.L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  4. History of the Atomic Energy Commission

    International Nuclear Information System (INIS)

    Buck, A.L.

    1982-08-01

    This pamphlet traces the history of the Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946, to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  5. 77 FR 28420 - Commission Meeting

    Science.gov (United States)

    2012-05-14

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: June 7, 2012, at 9...

  6. A study on the planning for the research and development of nuclear energy

    International Nuclear Information System (INIS)

    Noh, Byong Chull; Won, B. C.; Bang, J. K.; Jung, Y. H.; Kim, M. R.; Cho, C. Y.; Lee, H. S.; Kim, J. U.; Yeo, J. W.; Hong, Y. P.; Kim, I. C.; Rha, K. H.; Yoon, Y. S.; Park, J. H.; Ko, Y. S.; Kim, S. S.; Kang, W. J.; Lee, Y. H.; Shim, H. W.

    1997-01-01

    This study has performed aiming to provide the government with the basic input to establish 'the comprehensive promotion plan for utilization, research and development of nuclear energy' and 'the mid- and long-term nuclear research and development program', thus the government set it up as a national plan after endorsement of Atomic Energy Commission. Next, the feasibility study of the proton accelerators construction which is expected to use for nuclear research and development and industry. And a systematic and integrated research and development management system for the large-scale projects has been studied considering the inherent uncertainty and high risk of research and development. (author). 24 tabs., 6 figs

  7. Continuous commissioning of buildings: A case study of a campus building in Denmark

    DEFF Research Database (Denmark)

    Markoska, Elena; Jradi, Muhyiddine; Jørgensen, Bo Nørregaard

    2016-01-01

    The general trend in building commissioning is that the commissioning is often either insufficiently comprehensive in its execution, or it is not conducted at all. As such, it has been observed that buildings often will contain faults that have not been discovered during the commissioning phase....... In this paper, we present a framework for continuous verification and commissioning of a building with a set of performance tests that are able to monitor the performance and functionality with a daily granularity. The performance tests are run on a newly constructed campus building in Denmark, over the course...... of three months, and the results of the performance tests are presented within a dashboard application, which helps verify that the building is performing accordingly to its original design intent....

  8. Katerynoslav is the scientific archived commission and collections of writing sights

    Directory of Open Access Journals (Sweden)

    K. O. Telezhnyak

    2014-02-01

    The scientific value of Katerynoslav of the scientific archived commission is marked in the article, that was instrumental in forming of a deserving spring base for science with a variety of issues and indicated that collecting as a practice was a creature of his time and contributed to the development of science, education. The scientific archived commissions were semi­official establishments. They executed the functions of local historical societies simultaneously. Collective activity of members of Commission was very fruitful. It influenced on maintenance of unique complexes of writing sources. It is necessary to mark selfless activity each to the member of Commission. People that enter in the complement of Commission became the business connoisseurs. Local researchers gradually from amateurs became professionals. Them active work was instrumental in awakening of the personal interest at local wide public to historical science and native edge.

  9. Individual performance evaluation of the Brazilian Nuclear Energy Commission (CNEN): a meta-evaluative study

    International Nuclear Information System (INIS)

    Bezerra, Leonardo Ferreira

    2017-01-01

    The present study is a summative meta-evaluation that had as objective to evaluate the quality of the process of evaluation of individual performance of the servers of the National Commission of Nuclear Energy, being guided by the scientific curiosity to know to what extent the evaluation of performance the National Commission for Nuclear Energy meets the quality standards disseminated by the Joint Committee on Standards for Educational Evaluation. The methodology chosen to be used was based on the management approach and had as a guiding principle of the study the elaboration of a framework of criteria considering the aforementioned standards. The criteria established in the criteria framework guided the preparation of the items of the questionnaire sent to the National Commission of Nuclear Energy servers. In addition to the questionnaire, the observation of this author was considered in the context where the phenomenon occurred, which allowed a better reflective analysis of the data collected by the questionnaire. Regarding the results, it can be inferred that the performance evaluation developed at the National Commission of Nuclear Energy can be considered of quality, highlighting the servers' trust for the data, the communication process of the program stages, the credibility of the evaluators, the process of negotiation of goals and adaptability of the instrument over the course of the cycle. However, there are some opportunities for improvement, considering the relevance of evaluation as a tool to improve the performance of the autarchy's servers. Among the points that need to be improved is that there is currently a lack of knowledge about the legal basis and justification of the process of evaluation process by the servers and the lack of clarity regarding the content of the final evaluation report. Among the recommendations of this study, one can consider as the most relevant the need to: disseminate the results of this meta-evaluation to the

  10. Anticipate and communicate: Ethical management of incidental and secondary findings in the clinical, research, and direct-to-consumer contexts (December 2013 report of the Presidential Commission for the Study of Bioethical Issues).

    Science.gov (United States)

    Weiner, Christine

    2014-09-15

    Genomic population research increases the possibility of finding genetic coding anomalies that are not the primary object of research but may have significance for the current and future medical care of research participants and progeny. The December 2013 Report of the Presidential Commission for the Study of Bioethical Issues (Anticipate and Communicate: Ethical Management of Incidental and Secondary Findings in the Clinical, Research, and Direct-to-Consumer Contexts (http://bioethics.gov/sites/default/files/FINALAnticipateCommunicate_PCSBI_0.pdf)) recommends that a researcher anticipate these findings and make a plan that addresses which findings will be communicated to research participants and how. Following these recommendations will be disruptive for both investigators and institutional review boards (IRBs) until the research community reaches consensus, or a mechanism for evolving consensus, on which results should be returned to research participants. A protocol-by-protocol approach, though laborious, makes sense for both investigators and IRBs as the research community thinks through the implications of genomic research. Epidemiologists will note that discussion of the return of results and the plan for communicating findings should be included in both the participant consent agreement and the research protocol submitted to the IRB. © The Author 2014. Published by Oxford University Press on behalf of the Johns Hopkins Bloomberg School of Public Health. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  11. Commission on Social Security

    CERN Multimedia

    Staff Association

    2010-01-01

    A commission studying past, present, and future social stakes ! For many years we have been hearing about the problems of funding of health insurance benefits in our different Member States. At CERN we are not totally immune from this problem.  To start with, let us recall that we have a mutual-benefit scheme which covers everyone for the consequences of the uncertainties in life (illness and accidents). The rules of our scheme are established by CERN in the framework of a sub-group of the Standing Concertation Committee, the CERN Health Insurance Scheme Board (CHISB), which is also in charge of managing the scheme.  The work of the “ProtSoc” (Protection Sociale – Social Security) commission, as we like to call it at the Staff Association, is to help your representatives on the CHISB, by preparing together with them the subjects and positions to be put forward and defended. This commission, which groups together the staff delegates who wish to invest their ...

  12. Liberalism, authority, and bioethics commissions.

    Science.gov (United States)

    MacDougall, D Robert

    2013-12-01

    Bioethicists working on national ethics commissions frequently think of themselves as advisors to the government, but distance themselves from any claims to actual authority. Governments however may find it beneficial to appear to defer to the authority of these commissions when designing laws and policies, and might appoint such commissions for exactly this reason. Where does the authority for setting laws and policies come from? This question is best answered from within a normative political philosophy. This paper explains the locus of moral authority as understood within one family of normative political theories--liberal political theories--and argues that most major "liberal" commentators have understood both the source and scope of ethics commissions' authority in a manner at odds with liberalism, rightly interpreted. The author argues that reexamining the implications of liberalism for bioethics commissions would mean changing what are considered valid criticisms of such commissions and also changing the content of national bioethics commission mandates. The author concludes that bioethicists who participate in such commissions ought to carefully examine their own views about the normative limits of governmental authority because such limits have important implications for the contribution that bioethicists can legitimately make to government commissions.

  13. Recent trends in user studies: action research and qualitative methods

    Directory of Open Access Journals (Sweden)

    T.D. Wilson

    1998-01-01

    Full Text Available This paper was commissioned by Professor Gernot Wersig of the Freie Universität, Berlin in 1980, as part of his Project, Methodeninstrumentarium zur Benutzforschung in Information und Dokumentation. It attempted to set out what was, for the time, a novel perspective on appropriate methodologies for the study of human information seeking behaviour, focusing on qualitative methods and action research, arguing that the application of information research depended up its adoption into the managerial processes of organizations, rather than its self-evident relationship to any body of theory.

  14. GenHyPEM: A research program on PEM water electrolysis supported by the European Commission

    Energy Technology Data Exchange (ETDEWEB)

    Millet, Pierre; Dragoe, Diana [Institut de Chimie Moleculaire et des Materiaux d' Orsay, UMR CNRS no 8182, Universite Paris-Sud 11, 15 rue Georges Clemenceau, 91405 Orsay Cedex (France); Grigoriev, Serguey; Fateev, Vladimir [Hydrogen Energy and Plasma Technology, Institute of Russian Research Center, Kurchatov Institute, 1, Kurchatov sq., 123182 Moscow (Russian Federation); Etievant, Claude [Compagnie Europeenne des Technologies de l' Hydrogene (CETH), Innov' Valley Entreprise, Batiment D0, Route de Nozay, 91461 Marcoussis Cedex (France)

    2009-06-15

    GenHyPEM (Generateur d'Hydrogene par electrolyse de l'eau PEM <>) is an STREP programme (no 019802) supported by the European Commission in the course of the 6th framework research programme. This R and D project which started in October 2005, is a 2.6 MEUR research effort over three years. It gathers partners from Belgium, Germany, Romania, Federation of Russia, Armenia and France. The main goal of the project is to develop low-cost and high pressure (50 bar) PEM water electrolysers for the production of up to several Nm{sup 3} H{sub 2}/h. The purpose of this communication is to present the current status of GenHyPEM. Major results and technological achievements obtained so far in the fields of academic (electrocatalysis, polymer electrolyte) and applied (stack development and performances) research are presented. Non-noble electrocatalysts have been identified to replace platinum for the HER and stable performances have been obtained during operation at high (1 A cm{sup -2}) current density, paving the way to substantial cost reductions. Prototype electrolysers producing from 0.1 to 5 Nm{sup 3} H{sub 2}/h have been successfully developed. (author)

  15. Commission 4: Ephemerides

    Science.gov (United States)

    Kaplan, George H.; Hohenkerk, Catherine Y.; Fukushima, Toshio; Arlot, Jean-Eudes; Bangert, John A.; Bell, Steven A.; Folkner, William M.; Lara, Martin; Pitjeva, Elena V.; Urban, Sean E.; Vondrák, Jan

    2012-04-01

    The Commission 4 Organizing Committee began its work for the 2009-2012 triennium by revising the commission's terms of reference, which serve as our ``mission statement.'' The new terms of reference are:(a)Maintain cooperation and collaboration between the national offices providing ephemerides, prediction of phenomena, astronomical reference data, and navigational almanacs.(b)Encourage agreement on the bases (reference systems, time scales, models, and constants) of astronomical ephemerides and reference data in the various countries. Promote improvements to the usability and accuracy of astronomical ephemerides, and provide information comparing computational methods, models, and results to ensure the accuracy of data provided.(c)Maintain databases, available on the Internet to the national ephemeris offices and qualified researchers, containing observations of all types on which the ephemerides are based. Promote the continued importance of observations needed to improve the ephemerides, and encourage prompt availability of these observations, especially those from space missions, to the science community.(d)Encourage the development of software and web sites that provide astronomical ephemerides, prediction of phenomena, and astronomical reference data to the scientific community and public.Promote the development of explanatory material that fosters better understanding of the use and bases of ephemerides and related data.

  16. Scenarios for a robust policy mix: the final report of the German study commission on sustainable energy supply

    International Nuclear Information System (INIS)

    Hennicke, P.

    2004-01-01

    In February 2000, the German Bundestag established a Study Commission on 'Sustainable Energy Supplies in View of Globalisation and Liberalisation' (cf. Final Report, 2002). The Commission's Final Report is a contribution made by Germany toward implementing the sustainable development objectives defined in 1992 at the World Summit in Rio de Janeiro (Agenda 21). Despite minority votes of several members of the Study Commission, the main outcomes of the Final Report are worthwhile discussing in other industrial countries. The Commission had been given the mandate to identify 'robust, sustainable development paths' for the energy sector for the period up to 2050, which represent a scientific basis for the German parliament's further decision-making in the field of long-term energy policy. The applied backcasting approach showed that an ambitious climate-protection goal--reducing CO 2 emissions by 80% by 2050 - is technically and economically feasible. The main strategies and instruments for protecting the climate while ensuring a sustainable energy supply are summarised

  17. The Audit Commission review of diabetes services in England and Wales, 1998-2001.

    Science.gov (United States)

    Fitzsimons, B; Wilton, L; Lamont, T; McCulloch, L; Boyce, J

    2002-07-01

    AIMS OF THE AUDIT COMMISSION: The Audit Commission has a statutory duty to promote the best use of public money. It does this through value for money studies, such as that reported in Testing Times[1]. This work has been followed with a review of innovative practice in commissioning. These initiatives aim to support the implementation of the diabetes national service framework. The Audit Commission also appoints external auditors to NHS organizations who assess probity and value for money in the NHS; the latter by applying national studies locally and by carrying out local studies. Research for Testing Times consisted of structured visits to nine acute trusts, a telephone survey of 26 health authorities and a postal survey of 1400 people with diabetes and 250 general practitioners. Local audits used a subset of the original research tools. Case studies were identified through a cascade approach to contacts established during Testing Times and through self-nomination. Rising numbers of people with diabetes are placing increasing pressure on hospital services. Some health authorities and primary care organizations have reviewed patterns of service provision in the light of the increasing demands. These reviews show wide variations in patterns of routine care. In addition, there is a widespread lack of data on the delivery of structured care to people with diabetes. People with diabetes report delays in gaining access to services, and insufficient time with staff. There are insufficient arrangements in place for providing information and learning opportunities to support self-management. As the number of people with diabetes continues to rise, the potential for providing more care in a primary care setting needs to be explored. This will enable specialist services to focus more effectively on those with the most complex needs.

  18. Danish Atomic Energy Commission Annual Report 1 April 1975 - 28 April 1976

    International Nuclear Information System (INIS)

    1976-10-01

    Activities of the Danish Atomic Energy Commission and the Research Establishment Risoe for the period 1 April 1975 - 28 April 1976 are summarized. Financial data are tabulated, and a list of staff publications is given. This is the last report before the dissolution of the Danish Atomic Energy Commission. (B.P.)

  19. Commissioning of Temelin NPP as seen by scientific supervisory group

    International Nuclear Information System (INIS)

    Svoboda, C.

    2003-01-01

    Scientific Supervisory Group worked during the Temelin NPP commissioning process as an independent supervisor. The main tasks and main results of its activity are described in this contribution. The characteristic common features of commissioning process and most important events from the Scientific Supervisory Group point of view are presented. In April 1999 the Czech Power Utility with the objective to achieve maximum level of nuclear safety and quality within the NPP Temelin commissioning procedures has established a special body / Scientific Supervisory Group and requested Nuclear Research Institute Rez plc to perform the required function. The Scientific Supervisory Group proceeds in accordance with its Statute and provides an independent specialised professional and expert work focused on nuclear safety assurance, assesment of the selected documentation related to plant preparedness for the individual commissioning stages, and, of course. on assessment of the commissioning tests results. While performing its function the Scientific Supervisory Group is guided by the Atomic Act and the relevant Directives of State Office for Nuclear Safety; its activities are in compliance with the applicable IAEA recommendations (Authors)

  20. The role of the Joint Research Centre from the European Commission in the European Structural Integrity Networks AMES, ENIQ and NESC

    International Nuclear Information System (INIS)

    Estorff, U. von; Torronen, K.

    1999-01-01

    Due to the reduction in many countries of the research budget for nuclear safety several European institutions and organisations and the Institute for Advanced Materials (IAM) of the Joint Research Centre (JRC) of the European Commission (EC) have developed co-operative programmes now organised into 'Networks' for mutual benefit. They include utilities, engineering companies, research and development (R and D) laboratories and regulatory bodies. These Networks are all organised and managed in a similar way, i.e. like the successful Programme for the Inspection of Steel Components (PISC). The IAM plays the role of Operating Agent, Reference Laboratory and Network Manager of these Networks: European Network on Ageing Materials Evaluation and Studies (AMES), European Network for Inspection Qualification (ENIQ) and Network for Evaluating Steel Components (NESC), each of them dealing with a specific aspect of fitness for purpose of materials in structural components. This article will describe how the network organisation works, which was the positive experience from the past, why the networks are a tool for integrating fragmented research in Europe and how they fit into the mission of the JRC and therefore follow the EC policy. (orig.)

  1. Commission Conditions d'emploi

    CERN Multimedia

    Staff Association

    2017-01-01

    Au CERN, nous avons la formidable possibilité d’imaginer nos CONDITIONS D’EMPLOIS. Rendez-vous compte ! Nous avons le pouvoir de proposer des idées et de les défendre pour avoir des conditions d’emplois qui soient les plus attractives possibles pour le personnel en place et à venir. ---------------- L’Association du personnel du CERN, tout le monde connait ou en a entendu parler. Ce qui est moins connu, ce sont les diverses commissions internes qui traitent des sujets propres à défendre les intérêts du personnel. Les publications dans notre journal, l’Echo, sont un des moyens à notre disposition pour vous faire découvrir chacune des commissions internes de l’Association du personnel (voir Echo n°242 sur la commission juridique, et Echo n°255 sur la commission des cas particuliers). Commission Conditions d&...

  2. Safe LHC beam commissioning

    International Nuclear Information System (INIS)

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  3. Commissioning of NSLS-II

    Energy Technology Data Exchange (ETDEWEB)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  4. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  5. Ghana Atomic Energy Commission : at a glance. 3. ed.

    International Nuclear Information System (INIS)

    1998-07-01

    The brochure provides a brief history of the establishment and functions of the Ghana Atomic Energy Commission. It also provides information on the structure, facilities and activities of existing research institutes and centres

  6. A Public Commissioning Maturity Model for Construction Clients

    NARCIS (Netherlands)

    Hermans, M.H.; Volker, L.; Eisma, P.R.

    2014-01-01

    Being a public organization with construction needs, whether they are housing, building or infrastructure related, implies close co-operation and interaction with the supply chain. Substantial research exists that focuses on project related aspects of commissioning and on the role of the

  7. Cognitive Enhancement and Beyond: Recommendations from the Bioethics Commission.

    Science.gov (United States)

    Allen, Anita L; Strand, Nicolle K

    2015-10-01

    Media outlets are reporting that cognitive enhancement is reaching epidemic levels, but evidence is lacking and ethical questions remain. The US Presidential Commission for the Study of Bioethical Issues (Bioethics Commission) has examined the issue, and we lay out the commission's findings and their relevance for the scientific community. Published by Elsevier Ltd.

  8. Israel Atomic Energy Commission 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Selecting the research efforts to be highlighted in the Israel Atomic Energy Commission`s Annual Report from the large body and broad spectrum of ongoing work is not an easy task. The extensive bibliography of published results attached to the report attests to the scope of this difficulty. Of the many worthwhile projects, four were chosen to represent best the current trends in the continuing R and D program at the research centers of the Israel Atomic Energy Commission. One of these trends is the growing cooperation with private industry, in an attempt to gear our R and D programs to respond to market demands. Another feature, noted already several years ago, is the extensive collaboration of our scientists and engineers with colleagues at other institutions, in Israel and abroad. some of the work reported is part of evolving international industrial cooperation projects, illustrating both these trends. Following a trend common to many nuclear research centers around the world, a substantial part of our research effort is non-nuclear in nature. This is illustrated in the first article, which deals with advances in the application of non-linear optics in diverse fields of science and technology. These include state-of-the-art solid-state lasers, rapid modulation of light signals, development and generation of tunable sources of coherent light, optical data storage and the microscopic probing of biological and inorganic samples. The present work reports on a range of R and D, from the fundamentals of non-linear optical materials to proof-of-principle demonstrations of non-linear subwavelength resolution microscopy, to fabrication of prototype commercial tunable laser systems The second report considers the microstrain characteristics in some alloys using X-ray diffraction (XRD). The research utilizes XRD line broadening effects to study the characteristics of alloys from especially prepared surfaces. These characteristics include the homogeneity of alloying

  9. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  10. Truth commissions and gender: A South African case study ...

    African Journals Online (AJOL)

    South Africa's gendered past was never substantially addressed by the South African Truth and Reconciliation Commission (TRC) despite attempts by women's groups to ensure its inclusion.. The TRC's treatment of gender was in part constrained by its 'gender-blind' mandate, which ignored the different experiences and ...

  11. A History of the Atomic Energy Commission

    Science.gov (United States)

    Buck, Alice L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  12. Aerial Measuring System (AMS)/ Israel Atomic Energy Commission (IAEC) Joint Comparison Study

    International Nuclear Information System (INIS)

    Halevy, I.; Dadon, S.; Sheinfeld, M.; Broide, A.; Rofe, S.; Yaar, I.; Wasiolek, P.

    2014-01-01

    In support of the U.S. Department of Energy (DOE) International Emergency Management and Cooperation (IEMC/NA-46) Program, the comparison of the U.S. and Israeli Aerial Measuring Systems (AMS) study was proposed and accepted. The study, organized by the DOE/National Nuclear Security Administration (NNSA) Remote Sensing Laboratory (RSL), involved the DOE/NNSA Aerial Measuring System Project based at the RSL and operated under a contractor agreement by National Security Technologies, LLC (NSTec), and the Israel Atomic Energy Commission (IAEC) Aerial Measuring System. The operational comparison was conducted at RSL-Nellis in Las Vegas, Nevada, during week of June 24–27, 2013. The Israeli system, Air RAM 2000 (figure 1, down), was shipped to RSL-Nellis and mounted together with the DOE Spectral Advanced Radiological Computer System, Model A (SPARCS-A, figure 1 up) on U.S. DOE Bell-412 helicopter for a series of aerial comparison measurements at local test ranges, including the Desert Rock Airport and Area 3 at the Nevada National Security Site (NNSS). A four-person Israeli team from the IAEC, Nuclear Research Center – Negev (NRCN) supported the activity. The main objective of this joint comparison was use the DOE/RSL Bell-412 helicopter aerial platform, perform the comparison study of measuring techniques and radiation acquisition systems utilized for emergency response by IEAC and NNSA AMS

  13. The Lancet Commission on Syria | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The journal has adopted a series of global commissions that convene groups of experts for a limited time to produce thematic work aimed at improving human lives through scientific review and inquiry, and to encourage accountability for the problem under study. The Commission on Syria marks the first time a Southern ...

  14. Nuclear Regulatory Commission information digest

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  15. A Guide to Building Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  16. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  17. Muon Beamline Commissioning and Feasibility Study for μSR at a New DC Muon Beamline, MuSIC-RCNP, Osaka University

    Science.gov (United States)

    Tomono, Dai; Fukuda, Mitsuhiro; Hatanaka, Kichiji; Higemoto, Wataru; Kawashima, Yoshitaka; Kojima, Kenji M.; Kuno, Yoshitaka; Matsuda, Yugo; Matsuzaki, Teiichiro; Miyake, Yasuhiro; Miyamoto, Koichiro; Morita, Yasuyuki; Motoishi, Takahiro; Nakazawa, Yu; Ninomiya, Kazuhiko; Nishikawa, Ryo; Ohta, Saki; Sato, Akira; Shimomura, Koichiro; Takahisa, Keiji; Weichao, Yao; Wong, Ming L.

    At the new DC muon beamline MuSIC at Research Center for Nuclear Physics (RCNP), Osaka University, the beamline construction from the solenoid system of the muon production to the experimental port was completed. A beamline commissioning and a feasibility study for μSR are now in progress. With newly refurbished spectrometer installed at the experimental port, we succeeded in observing μSR spectra and μ-e decay asymmetry in a simple setup down to 4 K. We are still under development of other μSR appratuses.

  18. Engaging GPs in commissioning: realist evaluation of the early experiences of Clinical Commissioning Groups in the English NHS.

    Science.gov (United States)

    McDermott, Imelda; Checkland, Kath; Coleman, Anna; Osipovič, Dorota; Petsoulas, Christina; Perkins, Neil

    2017-01-01

    Objectives To explore the 'added value' that general practitioners (GPs) bring to commissioning in the English NHS. We describe the experience of Clinical Commissioning Groups (CCGs) in the context of previous clinically led commissioning policy initiatives. Methods Realist evaluation. We identified the programme theories underlying the claims made about GP 'added value' in commissioning from interviews with key informants. We tested these theories against observational data from four case study sites to explore whether and how these claims were borne out in practice. Results The complexity of CCG structures means CCGs are quite different from one another with different distributions of responsibilities between the various committees. This makes it difficult to compare CCGs with one another. Greater GP involvement was important but it was not clear where and how GPs could add most value. We identified some of the mechanisms and conditions which enable CCGs to maximize the 'added value' that GPs bring to commissioning. Conclusion To maximize the value of clinical input, CCGs need to invest time and effort in preparing those involved, ensuring that they systematically gather evidence about service gaps and problems from their members, and engaging members in debate about the future shape of services.

  19. 77 FR 26012 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2012-05-02

    ... ethical issues associated with the development of medical countermeasures for children as well as access... ethical issues associated with the development of medical countermeasures for children, and second, to... Study of Bioethical Issues AGENCY: Presidential Commission for the Study of Bioethical Issues, Office of...

  20. Commissioning of the ATLAS Liquid Argon Calorimeters

    CERN Document Server

    Cooke, M; The ATLAS collaboration

    2009-01-01

    Since the first modules of the ATLAS LAr calorimeters were read out in situ in 2006, commissioning studies have been performed. These studies include the testing of the electronics calibration system, surveys for dead or problematic channels, investigations of the quality of the physics pulse shape prediction , and tests of energy and time reconstruction with cosmic or single beam induced signals. The results of these commissioning studies indicate the LAr calorimeters are prepared for LHC collisions and positioned to meet the physics objectives of the ATLAS experiment.

  1. 47 CFR 1.1528 - Commission review.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission review. 1.1528 Section 1.1528... Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on its own initiative, in...

  2. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The global commissioning campaign begins this year with a series of weekly two-day global runs of limited participation until mid-March. The aim of these runs varies week-to-week, but includes the commissioning the calorimeter triggers, the muon track-finder triggers in the DT/CSC overlap, the PLL locking ranges, and generally accumulating data either for HCAL noise characterization or detector studies with cosmic muons. In mid-March a full Global Run is scheduled with all components participating, followed in April by a Cosmic Run with the aim of collecting statistics over a couple weeks with the installed Tracker and other subsystems. The ultimate milestone is the Cosmic Run At Four Tesla (CRAFT), with a completed CMS closed and the solenoid energized for data-taking during June. The Detector Performance Groups start the year with the focus to prepare for LHC collisions, and the associated challenges (CSA08) and global commissioning exercises (CRAFT) along the way. New this year is the addition of the Tri...

  3. U.S. Department of Energy & Nuclear Regulatory Commission Advanced Fuel Cycle Research & Development Seminar Series FY 2007 & 2008

    Energy Technology Data Exchange (ETDEWEB)

    Grandy, Christopher [Argonne National Lab. (ANL), Argonne, IL (United States)

    2008-08-01

    In fiscal year 2007, the Advanced Burner Reactor project initiated an educational seminar series for the Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) personnel on various aspects of fast reactor fuel cycle closure technologies. This important work was initiated to inform DOE and NRC personnel on initial details of sodium-cooled fast reactor, separations, waste form, and safeguard technologies being considered for the Advanced Fuel Cycle Research and Development program, and to learn the important lesson from the licensing process for the Clinch River Breeder Reactor Plant that educating the NRC staff early in the regulatory process is very important and critical to a project success.

  4. Atomic Energy Commission Act, 1963

    International Nuclear Information System (INIS)

    1963-01-01

    Promulgated in 1963, the Atomic Energy Commission Act (204) established and vested in the Ghana Atomic Energy Commission the sole responsibility for all matters relating to the peaceful uses of atomic energy in the country. Embodied in the Act are provisions relating to the powers, duties, rights and liabilities of the Commission. (EAA)

  5. Role of the team of scientific and technical commissioning support (TSTCS) during Mochovce NPP unit 3 and 4 commissioning

    International Nuclear Information System (INIS)

    Hermansky, J.; Prachar, M.; Sedlacek, M.; Petenyi, V.

    2011-01-01

    The Team of Scientific and Technical Commissioning Support (TSTCS) shall provide an independent support for the Mochovce NPP 3 and 4 Commissioning Department during Mochovce Units 3 and 4 commissioning. This independent support will be in line with the Mochovce NPP 3 and 4 Directive 'Non-active tests and commissioning' and it will be carried out in form of professional and expert works focusing on supervision of fulfilment of requirements for nuclear safety observance. The TSTCS duty to provide for such services during NPP commissioning is specified by Slovak Regulatory Body legislation. The independent TSTCS will supervise; - fulfilment of requirements for nuclear safety during preparation and implementation of commissioning tests; -scientific and technical level of commissioning programmes, and reflection on nuclear safety requirements in commissioning programmes,- commissioning process and test results. Main standpoints of the Team activities for individual unit commissioning stages will be; - assesment of the selected programs of functional tests in installations having an impact on nuclear safety and evaluation of the results of these tests; - assesment of the programs of physics and power commissioning, - assesment of the unit preparedness before fuel loading start; - assesment of the unit preparedness for performing initial criticality and low power commissioning and power commissioning stages; - evaluation of the results of physics and power commissioning stages and sub-stages; - final evaluation of the results from implementing the physics and power commissioning stages. The paper also presents a short description of the Team scope activities, the Team organisation, and a procedure for issuing of standpoints to individual unit commissioning stages. (Authors)

  6. Improving Internet Governance: Support to the Global Commission ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project provides continued support to the Global Commission on Internet Governance (GCIG) to engage the developing world in important Internet governance discussions. The funds will allow the GCIG to conduct research on the Internet-related dimensions of public policy to inform recommendations for the future of ...

  7. The Kemeny commission report. Comments by UKAEA

    International Nuclear Information System (INIS)

    1979-01-01

    The report of the President's Commission - the Kemeny Report - on the accident at Three Mile island has been considered by the UKAEA and the implications of the Commission's findings and recommendations for the United Kingdom examined. The contents of the report have been studied not only generally but also for each site and especially with respect to plant instrumentation, operator training, emergency arrangements and communications. The Authority believes that there are no major deficiencies but is fully aware of the crucial importance of continuing to exercise all possible care and ensuring that each detailed point arising from the Kemeny Commission's Report is given careful thought. (U.K.)

  8. Jules Horowitz Reactor: Organisation for the Preparation of the Commissioning Phase and Normal Operation

    Energy Technology Data Exchange (ETDEWEB)

    Estrade, J.; Fabre, J. L.; Marcille, O. [French Alternative Energies end Atomic Energy Commission, Provence (France)

    2013-07-01

    The Jules Horowitz Reactor (JHR) is a new modern Material Testing Reactor (MTR) currently under construction at CEA Cadarache research centre in the south of France. It will be a major research facility in support to the development and the qualification of materials and fuels under irradiation with sizes and environment conditions relevant for nuclear power plants in order to optimise and demonstrate safe operations of existing power reactors as well as to support future reactors design. It will represent also an important research infrastructure for scientific studies dealing with material and fuel behaviour under irradiation. The JHR will contribute also to secure the production of radioisotope for medical application. This is a key public health stake. The construction of JHR which started in 2007 is going-on with target of commissioning by the end of 2017. The design of the reactor provides modern experimental capacity in support to R and D programs for the nuclear energy for the next 60 years. In parallel to the facility construction, the preparation of the future staff and of the organisation to operate the reactor safely, reliably and efficiently is an important issue. In this framework, many actions are in progress to elaborate: Ο the staffing and the organisational structure for the commissioning test phases and also for normal operation, Ο the documentation in support to the reactor operation (safety analysis report, general operating rules, procedures, instructions, ···), Ο the maintenance, in service and periodic test programs, Ο staff training programs by using dedicated facilities (simulator, ···) Ο commissioning test programs for ensuring that the layout of systems and subcomponents is completed in accordance with the design requirements, the specification performances and the safety criteria. These commissioning tests will also be helpful for transferring the knowledge on the installed systems to the operating group. This paper gives the

  9. Commissioning of the IDS Neutron Detector and $\\beta$-decay fast-timing studies at IDS

    CERN Document Server

    Piersa, Monika

    2016-01-01

    The following report describes my scientific activities performed during the Summer Student Programme at ISOLDE. The main part of my project was focused on commissioning the neutron detector dedicated to nuclear decay studies at ISOLDE Decay Station (IDS). I have participated in all the steps needed to make it operational for the IS609 experiment. In the testing phase, we obtained expected detector response and calibrations confirmed its successful commissioning. The detector was mounted in the desired geometry at IDS and used in measurements of the beta-delayed neutron emission of $^8$He. After completing aforementioned part of my project, I became familiar with the fast-timing method. This technique was applied at IDS in the IS610 experiment performed in June 2016 to explore the structure of neutron-rich $^{130-134}$Sn nuclei. Since the main part of my PhD studies will be the analysis of data collected in this experiment, the second part of my project was dedicated to acquiring knowledge about technical de...

  10. Summary of the contributions to reactor safety research commissioned by the Republic of Austria and done by the Forschungszentrum Seibersdorf from 1987 to 1990

    International Nuclear Information System (INIS)

    Sonneck, G.; Sdouz, G.

    1991-09-01

    In 1987 the Forschungszentrum Seibersdorf was commissioned by the Republic of Austria with the collaboration in the Nuclear Safety Research Index, the OECD-LOFT-Programme and the International Coordinated Assessment and Application Programme (ICAAP). This report summarises the work done from 1987 to 1990, mainly in the field of thermal hydraulics, fuel rod behaviour and source term. Besides some analyses for experiments done in loops based on BWRs and PWRs of western design the work concentrated on safety researchs for WWERS. (Authors)

  11. The grave is wide: the Hibakusha of Hiroshima and Nagasaki and the legacy of the Atomic Bomb Casualty Commission and the Radiation Effects Research Foundation.

    Science.gov (United States)

    O'Malley, Gerald F

    2016-07-01

    Following the atomic bomb attacks on Japan in 1945, scientists from the United States and Japan joined together to study the Hibakusha - the bomb affected people in what was advertised as a bipartisan and cooperative effort. In reality, despite the best efforts of some very dedicated and earnest scientists, the early years of the collaboration were characterized by political friction, censorship, controversy, tension, hostility, and racism. The 70-year history, scientific output and cultural impact of the Atomic Bomb Casualty Commission and the Radiation Effects Research Foundation are described in the context of the development of Occupied Japan.

  12. The Danish Welfare Commission

    DEFF Research Database (Denmark)

    Gjerding, Allan Næs

    2006-01-01

    on public services, and install economic incentives for the behaviour of private households. The paper then digs into the proposals of the commission that are broadly grouped into five policy target areas con-cerning (1) the ageing of the population, (2) the incentives for labour market participation, (3......The paper deals with the main report of the Danish Welfare Commission and the one-hundred-and-nine proposals on the structure of the future Danish welfare state that the com-mission has put forward. Following upon a brief review of the discussion on the work of the Danish Welfare Commission......) competitiveness in the global economy, (4) behavioural regulation of the use of public bene-fits and services, and (5) management within tight budgets of an increasing demand on health and care. Finally, the concluding section sums up the discussion and elaborates on the debate on the Welfare Commission’s work...

  13. How are clinical commissioning groups managing conflicts of interest under primary care co-commissioning in England? A qualitative analysis.

    Science.gov (United States)

    Moran, Valerie; Allen, Pauline; McDermott, Imelda; Checkland, Kath; Warwick-Giles, Lynsey; Gore, Oz; Bramwell, Donna; Coleman, Anna

    2017-11-08

    From April 2015, NHS England (NHSE) started to devolve responsibility for commissioning primary care services to clinical commissioning groups (CCGs). The aim of this paper is to explore how CCGs are managing potential conflicts of interest associated with groups of GPs commissioning themselves or their practices to provide services. We carried out two telephone surveys using a sample of CCGs. We also used a qualitative case study approach and collected data using interviews and meeting observations in four sites (CCGs). We conducted 57 telephone interviews and 42 face-to-face interviews with general practitioners (GPs) and CCG staff involved in primary care co-commissioning and observed 74 meetings of CCG committees responsible for primary care co-commissioning. Conflicts of interest were seen as an inevitable consequence of CCGs commissioning primary care. Particular problems arose with obtaining unbiased clinical input for new incentive schemes and providing support to GP provider federations. Participants in meetings concerning primary care co-commissioning declared conflicts of interest at the outset of meetings. Different approaches were pursued regarding GPs involvement in subsequent discussions and decisions with inconsistency in the exclusion of GPs from meetings. CCG senior management felt confident that the new governance structures and policies dealt adequately with conflicts of interest, but we found these arrangements face limitations. While the revised NHSE statutory guidance on managing conflicts of interest (2016) was seen as an improvement on the original (2014), there still remained some confusion over various terms and concepts contained therein. Devolving responsibility for primary care co-commissioning to CCGs created a structural conflict of interest. The NHSE statutory guidance should be refined and clarified so that CCGs can properly manage conflicts of interest. Non-clinician members of committees involved in commissioning primary care

  14. The 'added value' GPs bring to commissioning: a qualitative study in primary care.

    Science.gov (United States)

    Perkins, Neil; Coleman, Anna; Wright, Michael; Gadsby, Erica; McDermott, Imelda; Petsoulas, Christina; Checkland, Kath

    2014-11-01

    The 2012 Health and Social Care Act in England replaced primary care trusts with clinical commissioning groups (CCGs) as the main purchasing organisations. These new organisations are GP-led, and it was claimed that this increased clinical input would significantly improve commissioning practice. To explore some of the key assumptions underpinning CCGs, and to examine the claim that GPs bring 'added value' to commissioning. In-depth interviews with clinicians and managers across seven CCGs in England between April and September 2013. A total of 40 clinicians and managers were interviewed. Interviews focused on the perceived 'added value' that GPs bring to commissioning. Claims to GP 'added value' centred on their intimate knowledge of their patients. It was argued that this detailed and concrete knowledge improves service design and that a close working relationship between GPs and managers strengthens the ability of managers to negotiate. However, responders also expressed concerns about the large workload that they face and about the difficulty in engaging with the wider body of GPs. GPs have been involved in commissioning in many ways since fundholding in the 1990s, and claims such as these are not new. The key question is whether these new organisations better support and enable the effective use of this knowledge. Furthermore, emphasis on experiential knowledge brings with it concerns about representativeness and the extent to which other voices are heard. Finally, the implicit privileging of GPs' personal knowledge ahead of systematic public health intelligence also requires exploration. © British Journal of General Practice 2014.

  15. SSCL Commissioning and Operations

    International Nuclear Information System (INIS)

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  16. Introductory user's manual for the US Nuclear Regulatory Commission Reactor Safety Research Data Bank. Revision 3

    International Nuclear Information System (INIS)

    Hardy, H.A.; Laats, E.T.

    1985-03-01

    The United States Nuclear Regulatory Commission (USNRC) has established the NRC/Division of Accident Evaluation (DAE) Data Bank Program to collect, store, and make available data from the many domestic and foreign water reactor safety research programs. Local direction of the program is provided by EG and G Idaho, Inc., prime contractor for the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL). The NRC/DAE Data Bank Program provides a central computer storage mechanism and access software for data to be used by code development and assessment groups in meeting the code correlation needs of the nuclear industry. The administrative portion of the program provides data entry, documentation, training, and advisory services to users and the USNRC. The NRC/DAE Data Bank and the capabilities of the data access software are described in this document

  17. 75 FR 16127 - Establishment of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2010-03-31

    ... Ms. Crawford work in the Commission's office located at: 1425 New York Avenue, NW., Suite C100... advances in biomedicine and related areas of science and technology. The Commission shall pursue its work..., medicine, technology, engineering, law, philosophy, theology, and other areas of the humanities or social...

  18. The Commission of European Communities project 'mirage' (migration of radionuclides in the geosphere)

    International Nuclear Information System (INIS)

    Come, B.

    1984-01-01

    The co-ordinated project 'MIRAGE' on Migration of Radionuclides in the Geosphere corresponds to the follow-up, from 1983 onwards, of the present activities of the laboratories of the Member States, up to the end of 1984, and of the Joint Research Centre at Ispra, up to the end of 1983. It is concentrated upon the study of the transfer of radioactivity from conditioned waste through the different barriers up to the interface between the geosphere and the biosphere. The MIRAGE project is performed in the framework of the Commission of European Communities (CEC) indirect action programme on Management and Storage of Radioactive Waste, sub-programme Undergound Disposal, and of the CEC direct action programme on Safety of Nuclear Materials at the Joint Research Centre, Ispra Establishment. The total financial commitment in this project is at present 6,384,000 ECU for 1983 and 1984 and the Commission participates financially in each study selected on a cost-sharing basis to a level of about 40% of the total cost. The costs of the studies performed at JRC-Ispra are not included in this amount. The number of organizations, firms and laboratories involved in this project comes to about 40

  19. Atomic Energy Commission (Amendment) Law, 1993

    International Nuclear Information System (INIS)

    1993-02-01

    The Atomic Energy Commission (Amendment) Law, 1993 (P.N.D.C.L. 308) seeks to amend the Atomic Energy Commission Act of 1963 (Act 204) so as to provide for the establishment of a Radiation Protection Board and other institutes under the Ghana Atomic Energy Commission. The Law further repeats the Atomic Energy Commission (Amendment) Law of 1982 (P.N.D.C.L. 37). (EAA)

  20. Should diabetes be commissioned through multidisciplinary networks, rather than Practice Based Commissioning?

    Science.gov (United States)

    Simmons, David; English, Patrick; Robins, Peter; Craig, Andrew; Addicott, Rachael

    2011-04-01

    Diabetes is recognized as a complex, long term, largely asymptomatic condition requiring self management skills, a range of health care professionals and articulated health services. Diabetes Networks have been introduced to provide guidance from people with diabetes and local health professionals with different skills to ensure that diabetes care is well organized, sustainable and delivers quality care. We have considered the role of Diabetes Networks in the English setting. Drawing on studies of health service organization and health policy, we describe the context in which diabetes commissioning is currently occurring in England, the role of Diabetes Networks and key components for an effective Diabetes Network. We have identified that Diabetes Networks are not currently mandatory and discovered policy approaches that are likely to work against safe, timely, integrated approaches to diabetes services with potentially harmful impacts on people with diabetes in the future. Practice Based Commissioning, where it sidelines Diabetes Networks, is a particular concern. We have identified key components of Diabetes Networks including explicit frameworks for leadership, membership, funding, decision making, communication and action. Diabetes is a condition requiring collaboration between all involved. Diabetes Networks include patients and all relevant health professionals and should dictate what and how diabetes care should be commissioned within the local health economy. Copyright © 2010 Primary Care Diabetes Europe. Published by Elsevier Ltd. All rights reserved.

  1. Leadership for health commissioning in the new NHS.

    Science.gov (United States)

    Coleman, Anna; Segar, Julia; Checkland, Kath; McDermott, Imelda; Harrison, Stephen; Peckham, Stephen

    2015-01-01

    The purpose of this paper is to explore the early experiences of those involved with the development of Clinical Commissioning Groups (CCGs), examining how the aspiration towards a "clinically-led" system is being realised. The authors investigate emerging leadership approaches within CCGs in light of the criterion for authorisation that calls for "great leaders". Qualitative research was carried out in eight case studies (CCGs) across England over a nine-month period (September 2011 to May 2012) when CCGs were in their early development. The authors conducted a mix of interviews (with GPs and managers), observations (at CCG meetings) and examined associated documentation. Data were thematically analysed. The authors found evidence of two identified approaches to leadership - positive deviancy and responsible guardianship - being undertaken by GPs and managers in the developing CCGs. Historical experiences and past ways of working appeared to be influencing current developments and a commonly emerging theme was a desire for the CCG to "do things differently" to the previous commissioning bodies. The authors discuss how the current reorganisation threatens the guardianship approach to leadership and question if the new systems being implemented to monitor CCGs' performance may make it difficult for CCGs to retain creativity and innovation, and thus the ability to foster the positive deviant approach to leadership. This is a large scale piece of qualitative research carried out as CCGs were beginning to develop. It provides insight into how leadership is developing in CCGs highlighting the complexity involved in these roles.

  2. Cracks show in African Commission | Daniels | Africa Insight

    African Journals Online (AJOL)

    Far from providing leadership, the African Commission is riven with regional, linguistic and religious rivalries. Article Metrics. Metrics Loading ... Metrics powered by PLOS ALM · http://dx.doi.org/10.4314/ai.v31i4.22383 · AJOL African Journals Online. HOW TO USE AJOL... for Researchers · for Librarians · for Authors. OTHER ...

  3. The Lhc beam commissioning

    International Nuclear Information System (INIS)

    Redarelli, S.; Bailey, R.

    2008-01-01

    The plans for the Lhc proton beam commissioning are presented. A staged commissioning approach is proposed to satisfy the request of the Lhc experiments while minimizing the machine complexity in early commissioning phases. Machine protection and collimation aspects will be tackled progressively as the performance will be pushed to higher beam intensities. The key parameters are the number of bunches, k b , the proton intensity pe bunch, N, and the β in the various interaction points. All together these parameters determine the total beam power and the complexity of the machine. We will present the proposed trade off between the evolution of these parameters and the Lhc luminosity performance.

  4. Participatory approaches to environmental policy-making. The European Commission Climate Policy Process as a case study

    International Nuclear Information System (INIS)

    Van den Hove, S.

    2000-01-01

    The paper investigates the relevance of participatory approaches to environmental policy-making when sustainable development is taken as the encompassing normative basis for environmental governance. In the first section, we illustrate the frequent references to participatory approaches in environmental decision-making. We then look at environmental issue attributes as determinants of the problem-solving requirements for environmental decision-making. We conclude the section by investigating whether and how participatory approaches could answer some of these requirements. In the second section, an illustration is proposed with the presentation of a participatory process that took place in 1997, during the last phase of the international negotiations that led to the Kyoto Conference of the Parties to the UN Framework Convention on Climate Change, and in 1998 in the preparation of the post-Kyoto phase. The process, organised by the European Commission, consisted of a series of workshops whose objective was to furnish timely inputs responding to the European Commission's information needs for climate policy formation in the pre- and post-Kyoto periods. This was to be achieved through the establishment of interfaces between: (1) the research community; (2) the EC Climate negotiation team and through it the EU Member States representatives; (3) other Commission interests (the 'inside stakeholders'); (4) a range of 'outside' stakeholders including industry, finance and commerce, employment, environment, consumer and citizen interests. We reflect on the participatory nature of the process and show how the process met some of the decision-making requirements identified in the first section. 27 refs

  5. The impact of leadership development on GP mental health commissioning.

    Science.gov (United States)

    Dickerson, Emma; Fenge, Lee-Ann; Rosenorn-Lanng, Emily

    2017-07-03

    Purpose This paper aims to explore the learning needs of general practitioners (GPs) involved in commissioning mental health provision in England, and offer an evaluation of a leadership and commissioning skills development programme for Mental Health Commissioners. Design/methodology/approach Retrospective mixed method, including online mixed method survey, rating participants' knowledge, skills, abilities, semi-structured telephone interviews and third-party questionnaires were used. Results were analysed for significant differences using the Wilcoxon Signed Ranks test. Open-ended responses and interview transcripts were analysed thematically. Findings Indicative results showed that participants perceived significant impacts in ability across eight key question groups evaluated. Differences were found between the perceived and observed impact in relation to technical areas covered within the programme which were perceived as the highest scoring impacts by participants. Research limitations/implications The indicative results show a positive impact on practice has been both perceived and observed. Findings illustrate the value of this development programme on both the personal development of GP Mental Health Commissioners and commissioning practice. Although the findings of this evaluation increase understanding in relation to an important and topical area, larger scale, prospective evaluations are required. Impact evaluations could be embedded within future programmes to encourage higher participant and third-party engagement. Future evaluations would benefit from collection and analysis of attendance data. Further research could involve patient, service user and carer perspectives on mental health commissioning. Originality value Results of this evaluation could inform the development of future learning programmes for mental health commissioners as part of a national approach to improve mental health provision.

  6. Contributi econometrici della Cowles Commission, 1944-47: uno sguardo retrospettivo

    Directory of Open Access Journals (Sweden)

    L.R. KLEIN

    2013-10-01

    Full Text Available The Cowles Commission's econometric work had a profound effect on economic analysis after the Second World War. Econometrics was a young discipline at that time and the author discusses the principle contributors and their work at the Cowles Commission for Research in Economics. Successful econometrics relies on combining economics with mathematics and statistics. It is also important to remember that quantitative economics does not give results that are robust in very small confidence areas - rather they provide guidance for policy makers and facilitate a better understanding of the economy.  JEL Codes: B23 

  7. The PEC Network 1993. Directory of the Peace Education Commission. Peace Education Miniprints, No. 47.

    Science.gov (United States)

    Bjerstedt, Ake, Ed.

    This extensive list of the council members of the Peace Education Commission (PEC) from 1992-1994 gives mailing addresses and some telephone and fax numbers to enable direct contact with network members. The Peace Education Commission (PEC) facilitates international cooperation among individuals interested in peace education and research related…

  8. Nuclear Regulatory Commission 1989 Information Digest

    International Nuclear Information System (INIS)

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  9. The structure of state utility commissions and protection of the captive ratepayer: Is there a connection? Occasional paper {number_sign}23

    Energy Technology Data Exchange (ETDEWEB)

    Zearfoss, N.N.

    1998-06-01

    While there is a considerable body of literature on regulatory decision making, the dominant theories have emphasized the influence of external factors on commissioners, which largely result in capture. Underlying these theories is the assumption that resources translate into influence. The theory proposed in this research is that while resources are necessary in order to influence commission decisions, they are not sufficient. Instead, their effects are mediated by two conditions: one, the structural characteristics of each state commission, which enable it to acquire and analyze information and two, the attributes of the type of consumer safeguards, e.g. a rate freeze or quality-of-service standards with attached financial penalties, which commissions could have adopted. The guiding research hypothesis is that the greater the ability of the commission to acquire and analyze information, the more likely it is to enact more stringent measures to protect the captive ratepayer. The major implications of this research are two. (1) This research suggests that commissions react not just to political pressure and economic incentives, but also to information. Indeed, this research asserts that information is a significant determinant in the decision making process. (2) Where the general public has neither the knowledge nor the understanding to take a position with regard to an issue, a regulatory commission with greater resources and more professional personnel is more likely to be its champion than is a commission with fewer resources and less professional personnel.

  10. Restructuring the Energy System. Report of the Energy Commission

    International Nuclear Information System (INIS)

    1995-01-01

    The commission was instructed to examine the current energy policy programs for restructuring and developing the energy system (i.e. phasing out nuclear power and moving to renewable sources) and to analyze the needs for changes; to propose measures for ensuring an efficient electricity supply under the new conditions of a liberalized electricity market; and to present proposals for a schedule for reorganizing the energy system. The report gives a full picture of the Swedish energy system including supply, consumption, prices, environmental impacts, R and D, and international aspects. The commission concludes that one nuclear power plant can be closed during the 1990's without upsetting the power balances. Phasing out all nuclear plants by year 2010 will create problems with the price levels of electricity supply, and will conflict with the CO 2 reduction objective. The proposals for economic control measures for performing the restructuring include: An environmental bonus (or investment support) for environmentally sound electricity production financed by an electricity tax, a tax on nuclear power increasing with the age of the reactors, a reorganization fund to finance new and environmentally acceptable electricity production. Also, energy research should be allotted greater resources, in particular for new technology for electricity production. The commission points towards the possibilities for reducing energy consumption, and especially electricity consumption. Space heating should gradually move away from electric heating. Examples are given on measures for improving energy efficiency and problems with financing such measures should be studied

  11. The response of the Government of Ontario to the final report of the Royal Commission on Electric Power Planning

    International Nuclear Information System (INIS)

    1981-05-01

    In March 1980, after nearly five years of hearings and research, the Ontario Royal Commission on Electric Power Planning submitted the first volume of its final report. The remaining eight volumes were submitted in April 1980. The Commission made 88 recommendations on technical, operational, and policy issues. The present document sets out the Ontario government's response to the recommendations. The government accepts and is implementing 77 recommendations. Four recommendations require further study, and six have been rejected

  12. Viet Nam National Atomic Energy Commission

    International Nuclear Information System (INIS)

    1992-01-01

    Vietnam National Atomic Energy Commission (VINATOM) is a governmental body in charge of organizing and coordinating activities related to use of nuclear energy for peaceful purpose. VINATOM in structure consists of the Nuclear Research Institute (Dalat), the Institute of Nuclear Science and Technology (Hanoi), the Institute for Technology of Radioactive and Rare Elements (Hanoi), and the Centre for Nuclear Technique Application (Ho Chi Minh City). This catalogue introduces profiles of nuclear R and D activities under management by VINATOM. (N.H.A)

  13. Tire Crumb Research Study Literature Review / Gap ...

    Science.gov (United States)

    In order to more fully understand data gaps in human exposure and toxicity to tire crumb materials, ATSDR, CPSC and EPA undertook a collaborative effort in the form of a scientific literature review and subsequent gaps analysis. The first objective of the Literature Review and Gap Analysis (LRGA) collaboration was to identify the existing body of literature related specifically to human exposure to tire crumb materials through the use of synthetic turf athletic fields and playgrounds. The second objective was to characterize and summarize the relevant data from the scientific literature. The final objective was to review the summary information and identify data gaps to build on the current understanding of the state-of-the-science and inform the development of specific research efforts that would be most impactful in the near-term. Because of the need for additional information, the U.S. Environmental Protection Agency (EPA), the Centers for Disease Control and Prevention/Agency for Toxic Substances and Disease Registry (ATSDR), and the U.S. Consumer Product Safety Commission (CPSC) launched a multi-agency action plan to study key environmental human health questions. The Federal Research Action Plan includes numerous activities, including research studies (U.S. EPA, 2016). A key objective of the Action Plan is to identify key knowledge gaps.

  14. 75 FR 66378 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2010-10-28

    ..., and social issues related to potential scientific and technological advances; examine diverse... to formulation of public policy with regard to this advancing science. The Commission also will... third meeting in November. At this meeting, the Commission will continue discussing the emerging science...

  15. 78 FR 20647 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2013-04-05

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Public Meeting of the Presidential Commission for the... the Assistant Secretary for Health, Department of Health and Human Services. ACTION: Notice of Meeting..., ethics, religion, law, and engineering. The Bioethics Commission advises the President on bioethical...

  16. 78 FR 46335 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2013-07-31

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Public Meeting of the Presidential Commission for the... the Secretary, Department of Health and Human Services. ACTION: Notice of meeting. SUMMARY: The... Bioethics Commission is an advisory panel of the nation's leaders in medicine, science, ethics, religion...

  17. Commissioning of the LHC Cryogenic System Subsystems Cold Commissioning in Preparation of Full Sector Tests

    CERN Document Server

    Serio, L; Ferlin, G; Gilbert, N; Gruehagen, Henning; Knoops, S; Parente, C; Sanmartí, M

    2006-01-01

    The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distributed around the 26.7-km circumference ring located in a deep underground tunnel. The status of the cryogenic system commissioning is presented together with the experience gained in operating and commissioning it.

  18. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  19. U.S. Nuclear Regulatory Commission bases for control of solid materials

    International Nuclear Information System (INIS)

    Meck, R.A.; Cardille, F.P.; Feldman, C.; Gnugnoli, G.N.; Huffert, A.M.; Klementowicz, S.P.

    2002-01-01

    The U.S. Nuclear Regulatory Commission (NRC) is considering whether to proceed with rulemaking on the control of solid materials with very low levels of associated radioactivity. The current implementation of clearance by NRC licensees is the context for the decision. Inputs to the decision include information gathering efforts of the Commission in the areas of public workshops, dose assessments and inventories, the recommendations of the National Academies' National Research Council (NAs) on regulatory alternatives, and participation in international efforts by the International Atomic Energy Agency (IAEA). (author)

  20. Preparation and procedures of pre-commissioning on DECY-13 cyclotron

    International Nuclear Information System (INIS)

    Silakhuddin

    2016-01-01

    A preparation and procedures for pre-commissioning of DECY-13 Cyclotron have been discussed and the steps for these have been arranged. Pre-commissioning is a testing stage of individual subsystems when all subsystems have been integrated into a cyclotron system. The discussion was taken from references, the next the readiness of devices was studied and then the preparation and procedures of the pre-commissioning were arranged. The results of the discussion are that for doing the pre-commissioning of the cyclotron DECY-13 still requires the completion of RF-dee subsystem and some components for testing are still to be completed. (author)

  1. The international law commission and international environmental law

    International Nuclear Information System (INIS)

    Ramcharan, B.G.

    1975-01-01

    If the oceans are destroyed through pollution there will be nothing left to manage. Protection against pollution is thus a fundamental aspect of ocean management. What legal principles are available for the protection of the oceans. This paper brings together the relevant practice of the foremost international body responsible for the codification and development of international law: the International Law Commission. It describes the work of the Commission concerning: 1) pollution of the high seas; 2) pollution of international watercourses; and 3) international responsibility for environmental hazards. It concludes by expressing the hope that the Commission will further study, codify and develop international environmental law

  2. National Commission of Assessment of researches and studies related to the management of radioactive materials and wastes

    International Nuclear Information System (INIS)

    2010-01-01

    This report proposes an assessment of progress realized by studies and researches on the geological storage of long-life high- and intermediate-activity wastes, and on the separation-transmutation of actinides present in the spent fuel of nuclear reactors. The first part deals with storages and disposal, discusses the evolution of the deep storage concept since 2005, and the storage cost, analyses the storage operation (exploitation, closure, corrosion, lixiviation, dissolution and diffusion), reports the assessment of studies and researches (about radioactive wastes and sizing inventory models of geologic storage projects, in situ experiences, thermal load, phenomenological analysis of storage, researches performed to select a site), and more precisely discusses the storage cost issue. The second part deals with the separation-transmutation technology: the ASTRID programme, nuclear stock development scenarios and their consequences, impact of separation-transmutation on storage piece of land, fuel cycle. The third part gives an overview of other national actions and of experiences in other countries

  3. 17 CFR 201.57 - Commission review.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review. 201.57... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the... Division of the Commission may seek review of the initial decision on the fee application, or the...

  4. Commissioning of ATLAS

    CERN Document Server

    Thomas, J

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focussing on combined running and track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  5. ATF2 Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  6. ATF2 COMMISSIONING

    CERN Document Server

    Seryi, A; Parker, B; Schulte, D; Delahaye, J P; Tomas, R; Zimmermann, F; Wolski, A; Elsen, E; Sanuki, T; Gianfelice-Wendt, E; Ross, M; Wendt, M; Takahashi, T; Bai, S; Gao, J; Bolzon, B; Geffroy, N; Jeremie, A; Apsimon, R; Burrows, P; Constance, B; Perry, C; Resta-Lopez, J; Swinson, C; Araki, S; Aryshev, A; Hayano, H; Honda, Y; Kubo, K; Kume, T; Kuroda, S; Masuzawa, M; Naito, T; Okugi, T; Sugahara, R; Tauchi, T; Terunuma, N; Urakawa, J; Yokoya, K; Iwashita, Y; Sugimoto, T; Heo, A Y; Kim, E S; Kim, H S; Bambade, P; Renier, Y; Rimbault, C; Huang, J Y; Kim, S H; Park, Y J; Hwang, W H; Blair, G; Boogert, S; Karataev, P; Molloy, S; Amann, J; Bellomo, P; Lam, B; McCormick, D; Nelson, J; Paterson, E; Pivi, M; Raubenheimer, T; Spencer, C; Wang, M H; White, G; Wittmer, W; Woodley, M; Yan, Y; Zhou, F; Angal-Kalinin, D; Jones, J; Lyapin, A; Scarfe, A; Kamiya, Y; Komamiya, S; Oroku, M; Suehara, T; Yamanaka, T

    2010-01-01

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  7. Joint Commission

    Science.gov (United States)

    ... for the latest publication of The Joint Commission Journal on Quality and Patient Safety (JQPS). . How We Work Process improvement program breeds quality culture, empowers staff An article in Quality Progress, June ...

  8. 2. Annual report of the Electronuclear Energy Information Commission

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    During its second year of operation, the Electronuclear Energy Information Commission concentrated its efforts on current issues and the conditions and limits of information in the nuclear field. The Commission consulted official organizations (EDF, CEA, Ministry of Industry) as well as trade-union members, politicians and independent individuals of all opinions on electronuclear programs, the problem of 'cracks' discovered in some French reactors and on the public utility enquiry conducted for Plogoff. The Commission also studied the activities of the Ministry of Education in the training of young people in the type of reasoning necessary when faced with complex technical problems. The Commission emphasizes that information policies cannot be valid unless they are preceeded by, or at least accompanied by an appropriate and sufficient amount of education. The debates that took place on the various different topics arising are presented in the eleven following annexes: 1/ decree of November 10th, 1977 concerning the setting up of the Electronuclear Information Commission; 2/ composition of the Commission; 3/ the Harrisburg plant accident (United States); 4/ the 'cracks' observed in some French reactors; 5/ storage and processing of nuclear wastes; 6/ informing the population living in the vicinity of a nuclear plant; 7/ comparative electricity generation costs; 8/ hearing of syndical, political, and ecological organizations; 9/ information on nuclear energy in schools; 10/ quantitative comparisons of the pollution associated with various means; 11/ the realization of impact studies to Plogoff [fr

  9. Cracks show in African Commission | Daniels | Africa Insight

    African Journals Online (AJOL)

    Far from providing leadership, the African Commission is riven with regional, linguistic and religious rivalries. http://dx.doi.org/10.4314/ai.v31i4.22383 · AJOL African Journals Online. HOW TO USE AJOL... for Researchers · for Librarians · for Authors · FAQ's · More about AJOL · AJOL's Partners · Terms and Conditions of Use ...

  10. The ‘added value’ GPs bring to commissioning: a qualitative study in primary care

    Science.gov (United States)

    Perkins, Neil; Coleman, Anna; Wright, Michael; Gadsby, Erica; McDermott, Imelda; Petsoulas, Christina; Checkland, Kath

    2014-01-01

    Background The 2012 Health and Social Care Act in England replaced primary care trusts with clinical commissioning groups (CCGs) as the main purchasing organisations. These new organisations are GP-led, and it was claimed that this increased clinical input would significantly improve commissioning practice. Aim To explore some of the key assumptions underpinning CCGs, and to examine the claim that GPs bring ‘added value’ to commissioning. Design and setting In-depth interviews with clinicians and managers across seven CCGs in England between April and September 2013. Method A total of 40 clinicians and managers were interviewed. Interviews focused on the perceived ‘added value’ that GPs bring to commissioning. Results Claims to GP ‘added value’ centred on their intimate knowledge of their patients. It was argued that this detailed and concrete knowledge improves service design and that a close working relationship between GPs and managers strengthens the ability of managers to negotiate. However, responders also expressed concerns about the large workload that they face and about the difficulty in engaging with the wider body of GPs. Conclusion GPs have been involved in commissioning in many ways since fundholding in the 1990s, and claims such as these are not new. The key question is whether these new organisations better support and enable the effective use of this knowledge. Furthermore, emphasis on experiential knowledge brings with it concerns about representativeness and the extent to which other voices are heard. Finally, the implicit privileging of GPs’ personal knowledge ahead of systematic public health intelligence also requires exploration. PMID:25348997

  11. Disposition of recommendations of the National Research Council in the report ''Revitalizing Nuclear Safety Research''

    International Nuclear Information System (INIS)

    1988-06-01

    On December 8, 1986, the Committee on Nuclear Safety Research of the National Research Council submitted its report, ''Revitalizing Nuclear Safety Research,'' to the US Nuclear Regulatory Commission (NRC). The Commission and its staff have carefully reviewed the Committee's report and have extensively examined the planning, implementation, and management of NRC research programs in order to respond most effectively to the Committee's recommendations. This report presents the Commission's view of the Committee's report and describes the actions that are under way in response to its recommendations

  12. Commission of the European Communities review of fast reactor activities, March 1981

    Energy Technology Data Exchange (ETDEWEB)

    Balz, W [Commission of the European Communities, Brussels (Belgium)

    1981-05-01

    The Commission of the European Communities continued its activities in the field of fast reactors development essentially in the frame of the Fast Reactor Coordinating Committee (FRCC) and by execution of a Reactor Programme at its Joint Research Center (JRC). The study was concerned with introducing fast reactors into European Community, elaboration of preliminary safety criteria and guidelines for typical fast reactor accidents; codes and standards; LMFBR safety, fuel, fuel cycle safety.

  13. Commission of the European Communities review of fast reactor activities, March 1981

    International Nuclear Information System (INIS)

    Balz, W.

    1981-01-01

    The Commission of the European Communities continued its activities in the field of fast reactors development essentially in the frame of the Fast Reactor Coordinating Committee (FRCC) and by execution of a Reactor Programme at its Joint Research Center (JRC). The study was concerned with introducing fast reactors into European Community, elaboration of preliminary safety criteria and guidelines for typical fast reactor accidents; codes and standards; LMFBR safety, fuel, fuel cycle safety

  14. Biological dosimetry studies for boron neutron capture therapy at the RA-1 research reactor facility

    International Nuclear Information System (INIS)

    Trivillin, Veronica A.; Heber, Elisa M.; Itoiz, Maria E.; Schwint, Amanda E.; Castillo, Jorge

    2004-01-01

    Initial physical dosimetry measurements have been completed using activation spectrometry and thermoluminescent dosimeters to characterize the BNCT facility developed at the RA-1 research reactor operated by the National Atomic Energy Commission in Buenos Aires. Biological dosimetry was performed employing the hamster cheek pouch oral cancer model previously validated for BNCT studies by our group. Results indicate that the RA-1 neutron source produces useful dose rates for BNCT studies but that some improvements in the initial configuration will be needed to optimize the spectrum for thermal-neutron BNCT research applications. (author)

  15. Enacting localist health policy in the English NHS: the 'governing assemblage' of Clinical Commissioning Groups.

    Science.gov (United States)

    Hammond, Jonathan; Coleman, Anna; Checkland, Kath

    2018-01-01

    Objectives The Health and Social Care Act 2012 introduced Clinical Commissioning Groups to take responsibility for commissioning (i.e. planning and purchasing) the majority of services for local populations in the English NHS. Constituted as 'membership organizations', with membership compulsory for all GP practices, Clinical Commissioning Groups are overseen by, and are accountable to, a new arm's-length body, NHS England. This paper critically engages with the content and policy narrative of the 2012 Act and explores this in relation to the reality of local policy enactment. Methods Set against a careful review of the 2012 Act, a case study of a nascent Clinical Commissioning Groups was conducted. The research included observations of Clinical Commissioning Group meetings and events (87 h), and in-depth interviews (16) with clinical commissioners, GPs, and managers. Results The 2012 Act was presented as part of a broader government agenda of decentralization and localism. Clinical Commissioning Group membership organizations were framed as a means of better meeting the needs and preferences of local patients and realizing a desirable increase in localism. The policy delineated the 'governing body' and 'the membership', with the former elected from/by the latter to oversee the organization. 'The membership' was duty bound to be 'good', engaged members and to represent their patients' interests. Fieldwork with Notchcroft Clinical Commissioning Group revealed that Clinical Commissioning Groups' statutory duty to NHS England to 'ensure the continuous improvement' of GP practice members involved performance scrutiny of GP practices. These governance processes were carried out by a varied cast of individuals, many of whom did not fit into the binary categorization of membership and governing body constructed in the policy. A concept, the governing assemblage, was developed to describe the dynamic cast of people involved in shaping the work and direction of the Clinical

  16. Commissioning of the nuclear power plant

    International Nuclear Information System (INIS)

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  17. Molr - A delegation framework for accelerator commissioning

    CERN Document Server

    Valliappan, Nachiappan

    2017-01-01

    Accelerator commissioning is the process of preparing an accelerator for beam operations. A typical commissioning period at CERN involves running thousands of tests on many complex systems and machinery to ensure smooth beam operations and correct functioning of the machine protection systems. AccTesting is a software framework which helps orchestrate the commissioning of CERN’s accelerators and it’s equipment systems. This involves running and managing tests provided by various commissioning tools and analyzing their outcomes. Currently, AccTesting only supports a specific set of commissioning tools. In this project, we aim to widen the spectrum of commissioning tools supported by AccTesting by developing a generic and programmable integration framework called Molr, which would enable the integration of more commissioning tools with AccTesting. In this report, we summarize the work done during the summer student project and lay out a brief overview of the current status and next steps for Molr.

  18. 26th May 2011 -Delegate to CERN Open Council sessions and European Commission Head of Unit for Joint Programming European Research Area, DG Research and Innovation R. Lečbychová visiting the CERN Control Centre with M. Pojer, accompanied by CERN S. Stavrev.

    CERN Multimedia

    Maximilien Brice

    2011-01-01

    26th May 2011 -Delegate to CERN Open Council sessions and European Commission Head of Unit for Joint Programming European Research Area, DG Research and Innovation R. Lečbychová visiting the CERN Control Centre with M. Pojer, accompanied by CERN S. Stavrev.

  19. Study on Maintenance Personnel Development Plan For The Exported APR1400 Commissioning

    International Nuclear Information System (INIS)

    Cho, Sungbae; Kim, Jongdae; Jun, Hokwang; Hwang, Inok; Kang, Jaeyuel

    2012-01-01

    This paper indicates ways to develop maintenance personnel for the exported APR1400 commissioning. The exported APR1400 has not been experienced ay maintenance yet, and requirements for maintenance personnel have not been clarified yet. Based on sound maintenance experience, KEPCO Plant Service and Engineering Company (KEPCO KPS) has studied on maintenance training and career requirement to establish a development plan of the maintenance personnel for the exported nuclear power plant. By defining manpower and training requirement, and mobilization plan, we expect to secure reliability of the exported APR1400

  20. From franchise to state commission: Regulation of the electric utility industry, 1907 to 1932

    Science.gov (United States)

    Reutter, Keith Alan

    1997-09-01

    Empirical research into the effects of regulation on industry has been around since the early 1960s. Over the last thirty plus years a number of interesting results have been brought to the fore. For instance, it has been found that regulation of the trucking industry limits entry and increases prices. A similar result has been pointed to in other industries such as commercial airlines and banking. The effect of the state commission form of regulation on the electric utility industry has been less conclusive. State commissions became dominant during the period 1910-1930, replacing local franchising as a method of regulating the electric utility industry. Two competing theories suggest why this transformation took place, the "capture" and "public interest" theories of regulation. The capture theory of regulation suggests that the electric utility industry demanded state regulation as a way to earn above normal profits and reduce competition. The public interest theory suggests the purpose of regulation by state commissions was to benefit the general public by forcing the industry to be competitive. Few studies have tried to determine which theory more aptly describes the actual events that took place. The empirical model developed in Chapter V, is an extension of the current literature. A set of simultaneous equations describing the natural gas and electricity markets is estimated using cross-sectional time-series data from 1907 to 1932. The effect of regulation on the electric utility industry is modeled with a dummy variable taking on a value of one to designate that a state commission had been established. The results suggest the capture theory of regulation best describes the period under study. The empirical estimates indicate that state commissions (1) reduced the rate at which the real price of electricity was falling, (2) had a negative impact on firms entering the industry, (3) had a positive influence on the cost of producing a kwh of electricity, and (4

  1. The Industry Commission inquiry into charitable organisations.

    Science.gov (United States)

    Suter, K

    1996-01-01

    The Industry Commission has carried out Australia's largest inquiry into charities. It was, from the point of view of charities, an unsatisfactory operation, all the more so since it was not clear why the task had been given to the commission. This article examines the commission's work in three ways: the overall relationship between government and charities; the commission's proposed major reforms; and the minor reforms.

  2. Nuclear Regulatory Commission issuances, October 1993

    International Nuclear Information System (INIS)

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners' motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners' have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission's Memorandum and Order are included

  3. U.S. Arctic research in a technological age

    International Nuclear Information System (INIS)

    Johnson, P.L.

    1993-01-01

    The United States Arctic Research Commission was established in 1984 primarily as an advisory agency. An Interagency Arctic Research Policy Committee is one of the main recipients of the Commission's recommendations. The Committee formulated an Arctic research policy calling for research focused on national security concerns, regional development with minimal environmental or adverse social impact, and scientific research on Arctic phenomena and processes. In basic science, emphasis is placed on the need to understand Arctic processes as part of the global earth system. These processes include those that affect and are affected by climatic change. A new research program in Arctic systems science has three components: paleoenvironmental studies on ice core from Greenland; ocean-atmosphere interactions; and land-atmosphere interactions. The Commission also recognizes a need to focus on issues relevant to the Arctic as an integral component of the world economic system, since the Arctic is a significant source of petroleum and minerals. The Commission recommended that the Committee develop an Arctic engineering research plan with emphasis on such topics as oil spill prevention, waste disposal, small-scale power generation, and Arctic construction techniques. The USA is also cooperating in international Arctic research through the International Arctic Science Committee, the Arctic Environmental Protection Strategy, and the North Pacific Marine Science Organization

  4. Commission 1

    African Journals Online (AJOL)

    state" to provide the Commission with information on the measures that they have ...... policies and identify the gaps in ensuring the full realisation of socio- economic .... Boulle L, Harris Band Hoexter C Constitutional and Administrative Law.

  5. arXiv Medical Physics Commissioning

    CERN Document Server

    Meer, David

    The medical commissioning is an important step to bring a particle gantry into clinical operation for tumour treatments. This involves the parametrization and characterization of all relevant systems including the beam delivery, the patient table, the imaging systems and the connection to all required software components. This article is limited to necessary tasks for the beam delivery system of a pencil beam scanning system. Usually the commissioning starts with the characterization of the unscanned beam and the calibration of the beam energy. The following steps are the parametrization of the scanning system, the commissioning of the beam position monitoring system and characterization of the spot size, all requiring precisions better than 1 mm. The commissioning effort for these tasks depends also on the gantry topology. Finally, the calibration of the dose measurement system ensures that any dose distribution can be delivered with an absolute precision better than 1%.

  6. Can general practitioner commissioning deliver equity and excellence? Evidence from two studies of service improvement in the English NHS.

    Science.gov (United States)

    Gridley, Kate; Spiers, Gemma; Aspinal, Fiona; Bernard, Sylvia; Atkin, Karl; Parker, Gillian

    2012-04-01

    To explore some of the key assumptions underpinning the continued development of general practitioner-led commissioning in health services. Qualitative data from two studies of service improvement in the English NHS were considered against England's plans for GP-led commissioning. These data were collected through in-depth interviews with a total of 187 professionals and 99 people affected by services in 10 different primary care trust areas across England between 2008 and 2009. Internationally, GPs are seen to have a central position in health systems. In keeping with this, the English policy places emphasis on the 'pivotal role' of general practitioners, considered to be ideally placed to commission in the best interests of their patients. However, our evidence suggests that general practitioners do not always have a pivotal role for all patients. Moreover, it is planned that the new commissioning groups in England will not be subject to top-down performance management and this raises the question of how agreed quality standards will be met under the proposed new system. This paper questions the assumption that GPs are best placed to commission health services in a way that meets quality standards and leads to equitable outcomes. There is little evidence to suggest that GPs will succeed where others have failed and a risk that, without top-down performance management, service improvement will be patchy, leading to greater, not reduced, inequity.

  7. Commissioning a Rotating Target Wheel Assembly for Heavy Element Studies

    Science.gov (United States)

    Fields, L. D.; Bennett, M. E.; Mayorov, D. A.; Folden, C. M.

    2013-10-01

    The heaviest elements are produced artificially by fusing nuclei of light elements within an accelerator to form heavier nuclei. The most direct method to increase the production rate of nuclei is to increase the beam intensity, necessitating the use of a rotating target to minimize damage to the target by deposited heat. Such a target wheel was constructed for heavy element research at Texas A&M University, Cyclotron Institute, consisting of a wheel with three banana-shaped target cutouts. The target is designed to rotate at 1700 rpm, and a fiber optic cable provides a signal to trigger beam pulsing in order to avoid irradiating the spokes between target segments. Following minor mechanical modifications and construction of a dedicated electrical panel, the rotating target assembly was commissioned for a beam experiment. A 15 MeV/u beam of 20Ne was delivered from the K500 cyclotron and detected by a ruggedized silicon detector. The beam pulsing response time was characterized as a function of the rational frequency of the target wheel. Preliminary analysis suggests that the K500 is capable of pulsing at rates of up to 250 Hz, which is sufficient for planned future experiments. Funded by DOE and NSF-REU Program.

  8. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Science.gov (United States)

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0159] Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S... Policy. In SRM-SECY-12-0047, ``Revisions to the Nuclear Regulatory Commission Enforcement Policy,'' dated...

  9. Instrumented home energy rating and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  10. Review report: safety and reliability issues on digital instrumentation and control systems in nuclear power plants and United States Nuclear Regulatory Commission`s dispositions

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, Norio; Suzudo, Tomoaki [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-09-01

    Recently, digital instrumentation and control (I and C) systems have been applied to nuclear power plants (NPPs) in various countries. Introduction of digital I and C systems, however, raises special issues on design, implementation, safety and licensing. Since FY 1997, the Japan Atomic Energy Research Institute (JAERI) has been carrying out a project, Study on Reliability of Digital I and C Systems, which includes extensive reviews of design approaches, technical standards, regulatory processes, especially, in the United States. This report summarizes the results from the study of National Research Council (NRC) and the U.S. Nuclear Regulatory Commission`s (USNRC`s) responses to the recommendations made by the NRC`s study. That study identified six technical key issues (system aspects of digital I and C technology, software quality assurance, common-mode software failure potential, safety and reliability assessment methods, human factors and man-machine interface, dedication of commercial off-the-shelf hardware and software) and two strategic key issues (case-by-case licensing process, adequacy of technical infrastructure) that arise from the introduction of digital I and C technology and then, made recommendations to the USNRC for coping with digital I and C applications. The USNRC responded to each recommendation and showed their own dispositions in which the USNRC agreed with most of the recommendations. In Japan, it is expected that introduction of digital I and C technology is inevitable in NPPs because the vendors are gradually discontinuing support and stocking of analog components. To cope with such situations, there is a need to develop and update the standards and guidelines applicable to digital I and C technology. The key issues and the USNRC`s dispositions provided in this report is believed to be useful for developing and updating them. (J.P.N.)

  11. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  12. Decree no. 2005-79 from January 26, 2005, authorizing the Atomic Energy Commission to proceed to the definitive shutdown and dismantling operations of the nuclear facility no.21, named Siloette research reactor, in the Grenoble city territory (Isere)

    International Nuclear Information System (INIS)

    2005-02-01

    On May 26, 2003, the French atomic energy commission (CEA) addressed an authorization demand for the definitive shutdown and dismantling of the Siloette research reactor. After a technical and administrative instruction of this demand by the French nuclear safety authority (ASN), a project of decree has been presented on July 6, 2004 at the permanent section of the inter-ministry commission of basic nuclear facilities. The commission gave its favourable judgment which is the object of this decree. (J.S.)

  13. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    Tiziano Camporesi

    Pit commissioning activities The last 4 months have seen various major achievements in hardware commissioning, global data taking, readiness of the DPGs to deal with LHC data flows and alignment and calibration workflows. Since February, the global commissioning has been characterized on the one side by more and more of the final CMS detector becoming available for global readout and triggering and on the other side by consolidation of many of the central software infrastructure and of most of the services infrastructure. The reliability of services like cooling, power, gas has markedly improved with respect to what we observed in the second half of 2007.   Of particular note are the delivery of all low voltage power supplies, the commissioning of the final power distribution, the progressive commissioning ( still ongoing)  of the Detector Safety System and of the associated DCS early warning and alarm system. On the detector side, while already we are used to seeing all of HCAL being exe...

  14. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The commissioning effort is presently addressing two main areas: the commissioning of the hardware components at the pit and the coordination of the activities of the newly constituted Detector Performance groups (DPGs). At point 5, a plan regarding the service cavern and the commissioning of the connections of the off-detector electronics (for the data collection line and trigger primitive generation) to the central DAQ and the central Trigger has been defined. This activity was started early February and will continue until May. It began with Tracker electronics followed so far by HCAL and CSC. The goal is to have by May every detector commission, as much as possible, their data transfer paths from FED to Central DAQ as well as their trigger setups between TPGs and Global Level 1 trigger. The next focus is on connections of front-ends to the service cavern. This depends strongly on the installations of services. Presently the only detector which has its link fibers connected to the off-detector electr...

  15. Danish Atomic Energy Commission Annual Report 1 April 1974 -31 March 1975

    International Nuclear Information System (INIS)

    1975-10-01

    Activities of the Danish Atomic Energy Commission and the Risoe Research Establishment for the period April 1, 1974 to March 31, 1975 are summarized. The operations of the various facilities at the Research Establishment are revised. Operating staff levels and financial data are tabulated, and a list of staff publications is given. (author)

  16. 17 CFR 171.28 - Participation by Commission staff.

    Science.gov (United States)

    2010-04-01

    ... staff. 171.28 Section 171.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION..., Membership Denial and Registration Actions § 171.28 Participation by Commission staff. The Division of.... The Commission shall by order establish a supplementary briefing schedule for the Commission staff and...

  17. Point Lepreau G.S. commissioning management experience

    International Nuclear Information System (INIS)

    Alikhan, S.; Walker, W.J.

    1983-05-01

    This paper shares the experience gained by New Brunswick Power in commissioning its first nuclear plant, with particular emphasis on the management techniques that were developed. Some of the areas discussed include: organization of Nuclear Operations Group responsible for commissioning and its interface with construction; outline and scope of documentation required to define, execute and report commissioning to satisfy the licensing requirements, management techniques developed to implement commissioning; and a summary of lessons learned and recommendations for the future

  18. Israel Atomic Energy Commission 1996 Annual Report

    International Nuclear Information System (INIS)

    1996-01-01

    Selecting the research efforts to be highlighted in the Israel Atomic Energy Commission's Annual Report from the large body and broad spectrum of ongoing work is not an easy task. The extensive bibliography of published results attached to the report attests to the scope of this difficulty. Of the many worthwhile projects, four were chosen to represent best the current trends in the continuing R and D program at the research centers of the Israel Atomic Energy Commission. One of these trends is the growing cooperation with private industry, in an attempt to gear our R and D programs to respond to market demands. Another feature, noted already several years ago, is the extensive collaboration of our scientists and engineers with colleagues at other institutions, in Israel and abroad. some of the work reported is part of evolving international industrial cooperation projects, illustrating both these trends. Following a trend common to many nuclear research centers around the world, a substantial part of our research effort is non-nuclear in nature. This is illustrated in the first article, which deals with advances in the application of non-linear optics in diverse fields of science and technology. These include state-of-the-art solid-state lasers, rapid modulation of light signals, development and generation of tunable sources of coherent light, optical data storage and the microscopic probing of biological and inorganic samples. The present work reports on a range of R and D, from the fundamentals of non-linear optical materials to proof-of-principle demonstrations of non-linear subwavelength resolution microscopy, to fabrication of prototype commercial tunable laser systems The second report considers the microstrain characteristics in some alloys using X-ray diffraction (XRD). The research utilizes XRD line broadening effects to study the characteristics of alloys from especially prepared surfaces. These characteristics include the homogeneity of alloying

  19. Yellin's review of the Nuclear Regulatory Commission's Reactor Safety Study: comment

    International Nuclear Information System (INIS)

    Wilson, R.

    1976-01-01

    Joel Yellin (Bell J. Economics, Vol. 7, No. 1 (Spr. 1976)) reviewed the Reactor Safety Study (WASH-1400, or Rasmussen Report) published by the Nuclear Regulatory Commission and makes several criticisms. Wilson finds that some of these criticisms are much overstated, while others, although valid, are mainly criticisms of presentation. To be useful for public policy, reactor risks--and indeed all nuclear risks--must be compared with other risks society faces. Wilson feels that the Rasmussen Report is weak in these comparisons, primarily because there exist few estimates of risk in other places, but that the comparisons he does make indeed confirm that the risk is smaller than Yellin suggests. 20 references

  20. 19 CFR 213.5 - Access to Commission resources.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Access to Commission resources. 213.5 Section 213.5 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in...

  1. Alaska Public Offices Commission, Department of Administration, State of

    Science.gov (United States)

    Visiting Alaska State Employees State of Alaska Department of Administration Alaska Public Offices Commission Alaska Department of Administration, Alaska Public Offices Commission APOC Home Commission Filer ; AO's Contact Us Administration > Alaska Public Offices Commission Alaska Public Offices Commission

  2. 47 CFR 0.420 - Other Commission publications.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Other Commission publications. 0.420 Section 0... Information Printed Publications § 0.420 Other Commission publications. The following additional Commission publications may be purchased from the Superintendent of Documents: (a) Statistics of Communications Common...

  3. 29 CFR 2200.92 - Review by the Commission.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION RULES OF PROCEDURE Posthearing Procedures § 2200.92 Review by the Commission. (a) Jurisdiction of the Commission; issues on... Commission to review the entire case. The issues to be decided on review are within the discretion of the...

  4. Determinants of perceived and actual knowledge of commission paid by contributors in the pension funds industry

    Directory of Open Access Journals (Sweden)

    Pablo Farías

    2017-01-01

    Full Text Available This paper examines the determinants of perceived and actual knowledge of commission paid by contributors in the Chilean pension funds industry. Results show that price consciousness and brand credibility are positively associated with perceived and actual knowledge of commission paid by pension fund contributors. Results also show that financial literacy is only positively associated with actual knowledge of commission paid by contributors. Additionally, results show that price based advertising exposure is only positively associated with perceived knowledge of commission paid by contributors. This association is stronger for contributors with a high use of the price-quality cue. Based on the findings presented, implications for managers, regulators and researchers are drawn.

  5. National Capital Planning Commission Library contents

    Data.gov (United States)

    National Capital Planning Commission — The National Capital Planning Commission library catalog is a compilation of titles, authors, years of publication and topics of books, reports and NCPC publications.

  6. Competition and deregulation in the electric industry. A study of organizational change: The New York State Public Service Commission

    Science.gov (United States)

    Ashley, Deborah J. Cordaro

    2000-11-01

    Public organizations are formed in response to societal needs. They collect taxes, educate children, enforce laws and provide protection to the environment, the nation and consumers. One such organization is the New York State Public Service Commission. In 1907, legislation was passed to form the New York State Public Service Commission the first regulatory body of its kind in the United States. Its mission was to provide safe, reliable and reasonably priced electricity. Subsequently, this became the model that was implemented in every state in the nation. The past decade heralds an era of competition and a lessening of regulatory control. The telephone, natural gas and airline industries are in various stages of deregulation, and the electric industry is beginning down this path as well. In an environment such as this, are regulatory organizations necessary, and if they are, how can they organize to meet the new societal requirements? The case of the New York State Public Service Commission at this point in time offers a real time study of a regulatory body immersed in an environment that is calling for competition and an end to big government. Utilizing case studies of industries that have deregulated, or are in the process of deregulating, indicates a future societal need for regulations. This result does not lead to a conclusion that organizational change is unnecessary. This Dissertation will lay out the current organizational structure of the Public Service Commission, give an overview of the environmental signals, describe the mission/core values, and illustrate general political and employee factors that are indigenous to public service. Utilizing both classic and current organizational theory, an evaluation will be made of the Commission's need for change, their ability to change, and obstacles they may encounter.

  7. The Commissioning of the LHC Technical Systems

    CERN Document Server

    Saban, R; Baggiolini, V; Ballarino, A; Barbero-Soto, E; Bellesia, B; Bordry, Frederick; Bozzini, D; Casas-Lino, M-P; Chareyre, V; Claudet, S; Coelingh, G-J; Dahlerup-Petersen, K; Denz, R; Fehér, S; Flora, R; Gruwé, M; Kain, V; Kirby, G; Koratzinos, M; Lauckner, R; Le Naour, S; Mess, K-H; Millet, F; Montabonnet, V; Nisbet, D; Perea-Solano, B; Pojer, M; Principe, R; Rabehl, R; Rijllart, A; Redaelli, S; Rodríguez-Mateos, F; Schmidt, R; Serio, L; Siemko, A; Solfaroli-Camillocci, M; Thiesen, H; Venturini, W; Vergara-Fernandez, A; Verweij, A; Zerlauth, M

    2007-01-01

    The LHC is an accelerator with unprecedented complexity where the energy stored in magnets and the beams exceeds other accelerators by one-to-two orders of magnitude. To ensure a safe and efficient machine start-up without being plagued by technical problems, a phase of "hardware commissioning" was introduced: a thorough commissioning of technical systems without beam. This activity started in June 2005 with the commissioning of individual systems, followed by operating a full sector, one eighth of the machine; the commissioning is expected to last until spring 2008 when commissioning with beam will start. The LHC architecture allows the commissioning of each of the eight sectors independently from the others, before the installation of other sectors is complete. An important effort went into the definition of the programme and the organization of the coordination in the field, as well as in the preparation of the tools to record and analyze test results. This paper discusses the experience with this approach...

  8. 45 CFR 702.12 - Contempt of the Commission.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Contempt of the Commission. 702.12 Section 702.12 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS RULES ON HEARINGS, REPORTS, AND MEETINGS OF THE COMMISSION Hearings and Reports § 702.12 Contempt of the Commission...

  9. Joint US Geological Survey, US Nuclear Regulatory Commission workshop on research related to low-level radioactive waste disposal, May 4-6, 1993, National Center, Reston, Virginia; Proceedings

    Science.gov (United States)

    Stevens, Peter R.; Nicholson, Thomas J.

    1996-01-01

    This report contains papers presented at the "Joint U.S. Geological Survey (USGS) and U.S. Nuclear Regulatory Commission (NRC) Technical Workshop on Research Related to Low-Level Radioactive Waste (LLW) Disposal" that was held at the USGS National Center Auditorium, Reston, Virginia, May 4-6, 1993. The objective of the workshop was to provide a forum for exchange of information, ideas, and technology in the geosciences dealing with LLW disposal. This workshop was the first joint activity under the Memorandum of Understanding between the USGS and NRC's Office of Nuclear Regulatory Research signed in April 1992.Participants included invited speakers from the USGS, NRC technical contractors (U.S. Department of Energy (DOE) National Laboratories and universities) and NRC staff for presentation of research study results related to LLW disposal. Also in attendance were scientists from the DOE, DOE National Laboratories, the U.S. Environmental Protection Agency, State developmental and regulatory agencies involved in LLW disposal facility siting and licensing, Atomic Energy Canada Limited (AECL), private industry, Agricultural Research Service, universities, USGS and NRC.

  10. Process of becoming a mother for Iranian surrogacy-commissioning mothers: A grounded theory study.

    Science.gov (United States)

    Zandi, Mitra; Vanaki, Zohreh; Shiva, Marziyeh; Mohammadi, Eesa

    2018-01-01

    Little knowledge is available about the experiences of the commissioning mothers during the process of surrogacy; thus, the present study was conducted in order to explore and analyze this process. This study was conducted in a referral institute in Tehran with a qualitative approach and using grounded theory methodology. The data were collected through 39 unstructured, in-depth interviews that were conducted with 15 gestational commissioning mothers, two of their husbands, four surrogates, and five of the personnel at centers for assisted reproduction (some participants were interviewed more than once). Sampling started purposively and then continued theoretically. The analysis revealed the main concern of these mothers to be the feeling of "insecurity about becoming a mother" and their predominant strategy for dealing with it to be "seeking security about becoming a mother," which emerged as a core concept. The consequences of the mothers' adopted strategies and the effects of the intervening factors included "reaching a state of relative peace," "a continuing threat to one's identity," and "mental and physical exhaustion." Identifying the demands of this group of mothers can help medical personnel, particularly nurses, adopt better plans for the future and to optimize the care they provide to these patients. © 2017 Japan Academy of Nursing Science.

  11. US Nuclear Regulatory Commission annual report, 1985. Volume 2

    International Nuclear Information System (INIS)

    1986-01-01

    The decisions and actions of the Nuclear Regulatory Commission (NRC) during fiscal year 1985 are reported. Areas covered include reactor regulation, cleanup at Three Mile Island, analysis and evaluation of operational experience, nuclear materials, waste management, safeguards, inspection, enforcement, quality assurance, emergency preparedness, and nuclear regulatory research. Also, cooperation with the states, international programs, proceedings and litigation, and management are discussed

  12. A Staged Approach to LHC Commissioning

    CERN Document Server

    Lamont, M; Brüning, Oliver Sim; Collier, P; Lauckner, R; Schmidt, R

    2006-01-01

    Effective commissioning of the LHC with beam will demand very good preparation; all concerned subsystems will need to be well-prepared and thoroughly tested before first beam. To clarify the demands on the systems involved the objectives of the commissioning phases are presented, along with a breakdown of the phases and the essential prerequisites for each. The nature of the interdependencies between the various systems is highlighted; in particular the need for a well-planned commissioning of the machine protection system.

  13. Commissioning of the ATLAS Liquid Argon Calorimeters

    CERN Document Server

    Cooke, Mark S

    2009-01-01

    A selection of ATLAS liquid argon (LAr) calorimeter commissioning studies are presented. These include a coherent noise study, a measurement of the quality of the physics pulse shape prediction, and energy and time reconstruction analyses with cosmic and single beam signals.

  14. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  15. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  16. The commissioning of nuclear power plants

    International Nuclear Information System (INIS)

    1989-09-01

    The objectives and requirements to be met in commissioning nuclear power plants are presented. The objective of commissioning is to ensure that each component, subsystem, system, or structure in a plant will be capable of fulfilling its design requirements throughout its design life. The requirements for commissioning are: the preparation of a detailed, comprehensive, documented program to demonstrate that all components, systems and structures relevant to safety meet design intent; documented evidence that safety systems are fully operable and can meet design requirements; and, appropriate documentation of the actual state or behaviour of all components, systems and structures relevant to safety. All systems must be included in the commissioning program. Whenever possible, full safety system test should be performed. If a full system in situ test is not possible, alternative means are suggested. (8 refs.)

  17. Radiation Protection Institute,Ghana Atomic Energy Commission: Annual Report 2014

    International Nuclear Information System (INIS)

    2014-01-01

    The Radiation Protection Institute of the Ghana Atomic Energy Commission was established to provide scientific and technical support for executing the operational functions of the Radiation Protection Board. The 2014 Annual Report highlights the operational activities of Institutes. Also presented is a list of research projects, publications and abstracts of technical reports.

  18. Safety Culture Evaluation at Research Reactors of Pakistan Atomic Energy Commission

    International Nuclear Information System (INIS)

    Qamar, M.A.; Saeed, A.; Shah, J.H.

    2016-01-01

    The concept of safety culture was presented by IAEA in document INSAG-4 (1991), delineated as “assembly of characteristics and attitudes in organizations and individuals which establish that, as an overriding priority, nuclear plant safety issues receive the attention warranted by their significance”. The purpose of this paper is to describe the evaluation of safety culture at research reactors of the Pakistan Atomic Energy Commission (PAEC). Evaluating the safety culture of a particular organization poses some challenges which can be resolved by using safety culture evaluation models like those of Sachein (1992) and Harber-Barrier(1998). In PAEC, safety culture is the integral part of management system which not only promotes safety culture throughout the organization but also enhances its significance. To strengthen the safety culture, PAEC is also participating in a number of international and regional meetings of IAEA regarding safety culture. PAEC and the national regulator Pakistan Nuclear Regulatory Authority (PNRA) are also arranging workshops, peer reviews, sharing operational experiences and interacting with IAEA missions to enhance its capabilities in the field of safety culture. The Directorate General of Safety (DOS) is a corporate office of PAEC for safety and regulatory matters. DOS is in the process of implementing a program to evaluate safety culture at nuclear installations of PAEC to ensure that safety culture is included as a vital segment of the Integral Management System of the establishment. In this regard, training sessions and lectures on safety culture evaluation are normally conducted in PAEC for awareness and enhancement of the safety culture program. Safety culture is also addressed in PNRA Regulations like PAK-909 and PAK-913. In this paper we will focus on the safety culture evaluation in our research reactors, i.e., PARR-1 and PARR-2. The evaluation results will be based on observations, interviews of employees, group discussions

  19. Reactor aging research. United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Vassilaros, M.G.

    1998-01-01

    The reactor ageing research activities in USA described, are focused on the research of reactor vessel integrity, including regulatory issues and technical aspects. Current emphasis are described for fracture analysis, embrittlement research, inspection capabilities, validation od annealing rule, revision of regulatory guide

  20. European Commission study on energy costs and subsidies in the EU. Report for EDF

    International Nuclear Information System (INIS)

    Roques, Fabien; Perekhodtsev, Dmitri; Verhaeghe, Charles

    2014-01-01

    The European Commission (EC) has launched a study in order to provide a complete and consistent view on the subsidies and external costs associated with different power generation technologies. Such study is expected to provide input for policy making in years to come. FTI CL Energy has been mandated by EDF to provide a critical review of the methodology developed in the EC study, and to identify potential gaps in coverage and/or contestable assumptions. The study provides a description of best practice to improve the methodology and surveys the literature to provide a range of estimates for critical assumptions on costs and subsidies

  1. Information risk in emerging utility markets: The role of commission- sponsored audits

    Energy Technology Data Exchange (ETDEWEB)

    Wirick, D.W.; Lawton, R.W.; Burns, R.E.; Lee, S.

    1996-03-01

    As public utilities and regulators begin to define their new relationship under various forms of regulations, some have questioned the continuing need for commission-sponsored audits. This study evaluates the role of such audits by examining their core purpose: the reduction of information risk (risk that a commission might make a wrong decision because of reliance on faulty information). It identifies five generic types of information that will be needed by commissions in the future and describes a cost-benefit analysis for identifying the appropriate method for mitigating information risk for state regulatory commissions.

  2. Comparative Study on Research Reactor Operation Requirements of IAEA and Korea

    International Nuclear Information System (INIS)

    Yune, Young Gill; Chang, Woo Joon; Lee, Jinho

    2014-01-01

    The IAEA safety requirements represent a consensus view of the IAEA's member states and encompass the recommendations of international experts for the safety of the research reactor. The IAEA safety standards are acknowledged as a global standard by most countries in the world. Therefore, it is desirable to harmonize domestic safety requirements with those of the IAEA. Also, since the IAEA safety requirements include international endeavors to strengthen nuclear safety and to apply the latest nuclear safety technologies to nuclear facilities, a comparative analysis of the safety requirements of the IAEA and Korea for the research reactor will be beneficial to obtaining the insights to improve regulations of the research reactor in Korea. For the reason, a comparative study has been conducted for the research reactor operation safety requirements of the IAEA and Korea in this paper. This paper briefly introduced operation safety requirements in the NS-R-4, analysis methods of this study, and the analysis results. A comparative study has been performed on research reactor operation safety requirements of the IAEA and Korea. This study has identified some gaps in operation safety requirements for the NPP of Korea, comparing with those for the research reactor of the IAEA in the following areas: periodic safety assessment, utilization and modification of the reactor, extended shutdown, inspection/testing/maintenance, operating organization, emergency planning, and commissioning

  3. Let's do Diversity : report of the University of Amsterdam Diversity Commission

    NARCIS (Netherlands)

    G. Wekker (Gloria); M.W. Slootman (Marieke W.); R.A. Icaza Garza (Rosalba); H. Jansen (Hans); R. Vázquez (Rolando)

    2016-01-01

    markdownabstractBetween March and September 2016, the Diversity Commission studied diversity at the University of Amsterdam. Recognizing that the challenge to enhance social justice at the University requires active engagement with diversity, the Commission approached the topic along two lines:

  4. Optimization of the commissioning period of nuclear power plant

    International Nuclear Information System (INIS)

    Hou Ganglian; Li Chunyue

    2014-01-01

    Due to current equipment manufacture capacity, construction experience and other factors, commissioning of nuclear power projects was used to be postponed, which could lead to delay of the whole project. Based on the actual situation, optimization of commissioning period and its logic could be an effective way to improve this situation to some extent. Based on previous practice and experience in the schedule management for the commissioning nuclear power projects, this paper analyzes and discusses the characteristics of make commissioning plan and the difficulties of program implementation and strategies of commissioning plan optimization, discusses and presents ways of dynamic plan adjustment and optimization at the vision of entire project, synthesizes the methods of time management through commissioning itself, interface and management, expounds measures for the timing and optimization of commissioning schedule and commissioning period, and sums up the ways of optimization of commissioning period, improving management capabilities and control of optimization principles. (authors)

  5. Building and commissioning of a setup to study ageing phenomena in gaseous detectors

    International Nuclear Information System (INIS)

    Abuhoza, A.; Schmidt, H.R.; Biswas, S.; Frankenfeld, U.; Hehner, J.; Schmidt, C.J.

    2016-01-01

    In high-rate heavy-ion experiments, gaseous detectors encounter big challenges in terms of degradation of their performance due to a phenomenon called ageing. A setup for high precision ageing studies has been constructed and commissioned at the GSI detector laboratory. The setup as well as the gas system have been carefully optimized to reach a high sensitivity for ageing effects. Two different materials have been examined for their influence on gaseous detectors: RTV-3145 and Gerband 705. The details of the construction of the ageing test setup and the test results will be presented.

  6. Building and commissioning of a setup to study ageing phenomena in gaseous detectors

    Energy Technology Data Exchange (ETDEWEB)

    Abuhoza, A., E-mail: aabuhoza@kacst.edu.sa [GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt 64291 (Germany); King Abdulaziz City for Science and Technology (KACST), Riyadh (Saudi Arabia); Goethe-Universität, Frankfurt (Germany); Schmidt, H.R. [Eberhard-Karls-Universität, Tübingen (Germany); Biswas, S. [School of Physical Sciences, National Institute of Science Education and Research, Jatni 752050 (India); Frankenfeld, U.; Hehner, J.; Schmidt, C.J. [GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt 64291 (Germany)

    2016-07-11

    In high-rate heavy-ion experiments, gaseous detectors encounter big challenges in terms of degradation of their performance due to a phenomenon called ageing. A setup for high precision ageing studies has been constructed and commissioned at the GSI detector laboratory. The setup as well as the gas system have been carefully optimized to reach a high sensitivity for ageing effects. Two different materials have been examined for their influence on gaseous detectors: RTV-3145 and Gerband 705. The details of the construction of the ageing test setup and the test results will be presented.

  7. The Spallation Neutron Source Beam Commissioning and Initial Operations

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, Stuart [Argonne National Lab. (ANL), Argonne, IL (United States); Aleksandrov, Alexander V. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Allen, Christopher K. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Assadi, Saeed [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bartoski, Dirk [University of Texas, Houston, TX (United States). Anderson Cancer Center; Blokland, Willem [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Casagrande, F. [Michigan State Univ., East Lansing, MI (United States); Campisi, I. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Chu, C. [Michigan State Univ., East Lansing, MI (United States); Cousineau, Sarah M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Crofford, Mark T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Danilov, Viatcheslav [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Deibele, Craig E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dodson, George W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Feshenko, A. [Inst. for Nuclear Research (INR), Moscow (Russian Federation); Galambos, John D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Han, Baoxi [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hardek, T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Holmes, Jeffrey A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Holtkamp, N. [SLAC National Accelerator Lab., Menlo Park, CA (United States); Howell, Matthew P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Jeon, D. [Inst. for Basic Science, Daejeon (Korea); Kang, Yoon W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kasemir, Kay [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kim, Sang-Ho [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kravchuk, L. [Institute for Nuclear Research (INR), Moscow (Russian Federation); Long, Cary D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); McManamy, T. [McManamy Consulting, Inc., Middlesex, MA (United States); Pelaia, II, Tom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Piller, Chip [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Plum, Michael A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pogge, James R. [Tennessee Technological Univ., Cookeville, TN (United States); Purcell, John David [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Shea, T. [European Spallation Source, Lund (Sweden); Shishlo, Andrei P [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sibley, C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stockli, Martin P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stout, D. [Michigan State Univ., East Lansing, MI (United States); Tanke, E. [European Spallation Source, Lund (Sweden); Welton, Robert F [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Zhang, Y. [Michigan State Univ., East Lansing, MI (United States); Zhukov, Alexander P [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    The Spallation Neutron Source (SNS) accelerator delivers a one mega-Watt beam to a mercury target to produce neutrons used for neutron scattering materials research. It delivers ~ 1 GeV protons in short (< 1 us) pulses at 60 Hz. At an average power of ~ one mega-Watt, it is the highest-powered pulsed proton accelerator. The accelerator includes the first use of superconducting RF acceleration for a pulsed protons at this energy. The storage ring used to create the short time structure has record peak particle per pulse intensity. Beam commissioning took place in a staged manner during the construction phase of SNS. After the construction, neutron production operations began within a few months, and one mega-Watt operation was achieved within three years. The methods used to commission the beam and the experiences during initial operation are discussed.

  8. Perceptions and misconceptions regarding the Joint Commission's view of quality monitoring.

    Science.gov (United States)

    Patterson, C H

    1989-10-01

    The Joint Commission recently has revised its hospital standards for infection control to reflect more accurately current state-of-the-art practices. In addition, the Joint Commission's Agenda for Change initiatives include the development of clinical indicators; one of the topics that will be included in those clinical indicator sets will be infection control. How the hospital chooses to organize itself to conduct the historically required monitoring and evaluation of clinical patient care currently required by the standards of the Joint Commission is at the option of the hospital. How the hospital will organize and collect data specific to infection control indicators yet to be developed by the Joint Commission has not been determined and will not be defined until specific research and development projects are completed. The hospital is expected to have in place infection prevention, surveillance, and control programs; it also is expected to have in place a quality assurance program that focuses not only on solving identified problems but also on the improvement of patient care quality. How the hospitals organize and/or integrate these activities is also at its option. It is expected that qualified professionals will direct and enforce infection prevention, surveillance, and control practices; indicators for infection control can provide data that will help assess the relative success of those practices and activities. The Joint Commission is not developing the capability to judge, on its own part, the actual quality of care provided by an organization seeking accreditation. Rather, the Joint Commission is committed to developing more accurate means to evaluate the structures, processes, and outcomes of diagnosis and treatment activities, as well as their interrelationships. Clinical excellence is supported by quality in the organizational environment and the managerial and leadership contexts within which patient care is delivered. Both clinical and

  9. Ethical Principles, Process, and the Work of Bioethics Commissions.

    Science.gov (United States)

    Sulmasy, Daniel P

    2017-05-01

    Shortly after the Presidential Commission for the Study of Bioethical Issues was constituted in 2010 and days before the commission members were to join a conference call to discuss possible topics for their deliberation, Craig Venter held a press conference announcing that his lab had created a synthetic chromosome for a species of mycoplasma and had inserted this genetic material into organisms of another species of mycoplasma (the genes of which had been deactivated), transforming the host species into the donor species. While not overtly claiming to have "created life in the test tube," Venter's publicity seemed cleverly designed to provoke the media into reporting his discovery in just that way. The resulting uproar caused President Obama to give his new bioethics commission the assignment of investigating the ethics of the emerging field of synthetic biology. The commission went right to work. It formed working groups to deliberate about parts of the report, feeding ideas and language to the staff members who would do the actual writing, and then present the working group suggestions to the commission as a whole for public deliberation at open meetings. One of those working groups was charged with coming up with ethical principles that would guide the analysis. Having served as a member of that working group, I report here on the process by which these principles emerged and reflect upon the suitability of that process for the work of public bioethics commissions. © 2017 The Hastings Center.

  10. [Globalization in medical research].

    Science.gov (United States)

    Ehni, H-J; Wiesing, U

    2018-03-01

    The globalization of clinical research is gaining momentum. In particular, emerging countries, such as Brazil, India, Russia and South Africa show a significant increase in clinical trials. This trend is generating various ethical problems, which are examined in the present article. Sometimes, generally accepted ethical rules, such as the evaluation of clinical trials by ethics commissions are not respected and sometimes conflicts are generated which are difficult to resolve. For instance, it is controversial which standard of care researchers and sponsors have to provide in an international study. These conflicts are exacerbated by a fundamental dilemma: more research on diseases prevalent in developing and emerging countries is necessary. At the same time, the protection of study participants in those countries creates particular challenges. In recent years, international commissions and guidelines have achieved significant progress in solving these conflicts; however, the further development has to be analyzed very carefully. Incentives for better research on neglected diseases have to be created. Undesirable developments and abuse have to be prevented by appropriate international ethical standards.

  11. A study on the operator's errors of commission (EOC) in accident scenarios of nuclear power plants: methodology development and application

    International Nuclear Information System (INIS)

    Kim, Jae Whan; Jung, Won Dea; Park, Jin Kyun; Kang, Da Il

    2003-04-01

    As the concern on the operator's inappropriate interventions, the so-called Errors Of Commission (EOCs), that can exacerbate the plant safety has been raised, much of interest in the identification and analysis of EOC events from the risk assessment perspective has been increased. Also, one of the items in need of improvement for the conventional PSA and HRA that consider only the system-demanding human actions is the inclusion of the operator's EOC events into the PSA model. In this study, we propose a methodology for identifying and analysing human errors of commission that might be occurring from the failures in situation assessment and decision making during accident progressions given an initiating event. In order to achieve this goal, the following research items have been performed: Firstly, we analysed the error causes or situations contributed to the occurrence of EOCs in several incidents/accidents of nuclear power plants. Secondly, limitations of the advanced HRAs in treating EOCs were reviewed, and a requirement for a new methodology for analysing EOCs was established. Thirdly, based on these accomplishments a methodology for identifying and analysing EOC events inducible from the failures in situation assessment and decision making was proposed and applied to all the accident sequences of YGN 3 and 4 NPP which resulted in the identification of about 10 EOC situations

  12. Consultancy research as a barrier to strengthening social science research capacity in Uganda.

    Science.gov (United States)

    Wight, Daniel; Ahikire, Josephine; Kwesiga, Joy C

    2014-09-01

    There is a shortage of senior African social scientists available to lead or manage research in Africa, undermining the continent's ability to interpret and solve its socio-economic and public health problems. This is despite decades of investment to strengthen research capacity. This study investigated the role of individually commissioned consultancy research in this lack of capacity. In 2006 structured interviews (N = 95) and two group discussions (N = 16 total) were conducted with a fairly representative sample of Ugandan academic social scientists from four universities. Twenty-four senior members of 22 Ugandan and international commissioning organizations were interviewed. Eight key actors were interviewed in greater depth. Much of Ugandan social science research appears to take the form of small, individually contracted consultancy projects. Researchers perceived this to constrain their professional development and, more broadly, social science research capacity across Uganda. Conversely, most research commissioners seemed broadly satisfied with the research expertise available and felt no responsibility to contribute to strengthening research capacity. Most consultancy research does not involve institutional overheads and there seems little awareness of, or interest in, such overheads. Although inequalities in the global knowledge economy are probably perpetuated primarily by macro-level factors, in line with Dependency Theory, meso-level factors are also important. The current research market and institutional structures in Uganda appear to create career paths that seriously impede the development of high quality social science research capacity, undermining donor investments and professional effort to strengthen this capacity. These problems are probably generic to much of sub-Saharan Africa. However, both commissioning and research organizations seem ready, in principle, to establish national guidelines for institutional research consultancies. These

  13. Radioactive Waste Treatment and Conditioning Using Plasma Technology Pilot Plant: Testing and Commissioning

    International Nuclear Information System (INIS)

    Rafizi Salihuddin; Rohyiza Baan; Norasalwa Zakaria

    2016-01-01

    Plasma pilot plant was commissioned for research and development program on radioactive waste treatment. The plant is equipped with a 50 kW direct current of non-transferred arc plasma torch which mounted vertically on top of the combustion chamber. The plant also consists of a dual function chamber, a water cooling system, a compress air supply system and a control system. This paper devoted the outcome after testing and commissioning of the plant. The problems arise was discussed in order to find the possible suggestion to overcome the issues. (author)

  14. The Legal Policy Of The General Election As An Independent Commission A Review Of Indonesian Election 2014

    Directory of Open Access Journals (Sweden)

    Josner Simanjuntak

    2015-08-01

    Full Text Available Abstract The Legal Institution of the General Election in Indonesia has an important role in the process of elections to realize the sovereignty of the people. The legal institution is independent as mandated of the Indonesian constitution The 1945 Constitution. In the Election organizers as a chapter of the 1945 Constitution stating that the Election Commission shall be independent and impartial toward participating in the election and political party. However in practice this task is not easy and can be run smoothly it is difficult to maintain a balanced relationship between the participant election commissions. This research is a descriptive analytic one using juridical normative approach to study the legal principles legal synchronization. The technique being used to gather data is librarian research supported by field research using interview and questionnaire technique. The data being gathered are analyzed qualitatively. The result of the research shows that the legal institution the general election in undertaking has not been independent as expected because for institutional and administrative for has not been independence and not impartiality and not professionalism. The rules in the process of elections is it not the election system and achievement of justice.

  15. Alberta Petroleum Marketing Commission annual report, 1993

    International Nuclear Information System (INIS)

    1994-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1993 marked the last full year of the Commission operating as Alberta's representative in the energy regulatory arena in Canada and the USA; due to restructuring, these functions will be transferred to the Ministry of Energy in early 1994. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 40.2 million bbl, down 11% from 1992, and receipts of heavy crude were 3.7 million bbl, down 42% from 1992. Revenue from crude oil sales was $800 million, down 25% from 1992. The Commission's natural gas activities in 1993 included price determination and information collection. 4 figs., 3 tabs

  16. Startup and commissioning of pressurized water reactors

    International Nuclear Information System (INIS)

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  17. Commissioning MMS: Challenges and Lessons Learned

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  18. 75 FR 81244 - Military Leadership Diversity Commission Meeting

    Science.gov (United States)

    2010-12-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission Meeting... will take place: 1. Name of Committee: Military Leadership Diversity Commission (MLDC). 2. Date... Military Leadership Diversity Commission to continue their efforts to address congressional concerns as...

  19. Update on the activities of the central interstate low-level radioactive waste compact commission

    International Nuclear Information System (INIS)

    Peery, R.J.

    1987-01-01

    Since its formation in 1983, the Central Interstate Low-Level Radioactive Waste Compact Commission has moved at a deliberate pace to meet the responsibilities placed on the states by federal law. In addition to the normal activities associated with an agency empowered to regulate a specific industry, the Commission has conducted a number of studies designed to help it meet its responsibilities. The Phase I Site Exclusionary Study identified those areas in each of the member states that failed to meet criteria set out in 10 CFR 61. The key elements of a Management Study are: an evaluation of the region's waste stream, development of the procedures the Commission will use to select a developer for the region's waste facility, an assessment of disposal alternatives, and the development of a plan to review the results of the management plan. The Commission is conducting a Phase II Site Exclusionary Study in which a closer analysis of each area will allow the Commission to determine if there are areas in each state that are capable of being sited. The Commission is also considering the draft Request for Proposals to Develop a Low-Level Radioactive Waste Facility within the Region

  20. Official communication of the Safety Commission

    CERN Multimedia

    DG Unit

    2009-01-01

    The Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of 2 April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  1. Official communication of the Safety Commission

    CERN Multimedia

    DG Unit

    2009-01-01

    We, the Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of the 2nd April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  2. 77 FR 3752 - Commission Information Collection Activities (FERC-725I); Comment Request

    Science.gov (United States)

    2012-01-25

    ... accounting for double counting, the net number of entities responding will be approximately 167 entities... rule. The record retention cost comes from Commission staff research on record retention requirements... the collection of information, including the validity of the methodology and assumptions used; (3...

  3. International Commission on Radiological Protection. History, policies, procedures

    International Nuclear Information System (INIS)

    Lindell, Bo; Dunster, H.J.; Valentin, Jack; )

    2000-01-01

    This report briefly reviews the history, mode of operation, concepts, and current policies of the International Commission on Radiological Protection (ICRP). It touches upon the objectives of the Commission's recommendations, the quantities used, the biological basis of the Commission's policy, the quantitative basis for its risk estimates, the structure of the system of protection, some problems of interpretation and application in that system, and the need for stability, consistency, and clarity in the Commission's recommendations. (author)

  4. Alberta Petroleum Marketing Commission annual report, 1992

    International Nuclear Information System (INIS)

    1993-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1992 marked the end of chronically depressed natural gas prices and a significant reduction in natural gas surpluses. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, unchanged from 1991, and receipts of heavy crude were 6.3 million bbl, up 4% from 1991. Revenue from crude oil sales was $1.1 billion, down from $1.64 billion in 1991. The Commission's natural gas activities in 1992 included price determination and information collection. 9 figs., 1 tab

  5. Nuclear Regulatory Commission: 1981 annual report

    International Nuclear Information System (INIS)

    1981-01-01

    This seventh annual report of the US Nuclear Regulatory Commission covers major actions, events and planning that occurred during fiscal year 1981, with some coverage of later events, where appropriate. Chapters of the report address the agency's various functions or areas of activity: regulating nuclear power plants; evaluating reactor operating experience; licensing nuclear materials and their transportation; safeguarding nuclear plants and materials; managing nuclear wastes; inspection and enforcement; cooperation with state governments; international activities; research and standards development; hearings; decisions and litigation; and administrative and public communications matters. Each chapter presents a detailed review of program accomplishments during the report period, fiscal year 1981

  6. Status of Nuclear Activities of Bangladesh Atomic Energy Commission

    Energy Technology Data Exchange (ETDEWEB)

    Begum, Zakia [Planning and Development, Bangladesh Atomic Energy Commission - BAEC, Paramanu Bhaban, E 12/A, Agargoan, 01207 Shere Banglanagar, Dhaka (Bangladesh)

    2008-07-01

    Bangladesh Atomic Energy Commission (BAEC) is the national authority for acquisition, development and application of Nuclear Science and Technology and thus is playing the pioneering role for the development of the country's nuclear research programmes and thus helping to achieve the cherished goal of self-reliance through national efforts and international co-operation. Being firmly committed to the peaceful uses of Atomic Energy, programmes have been undertaken in Physical Sciences, Biological Sciences, Engineering and Nuclear Power Sector by Bangladesh Atomic Energy Commission and some of the results have been transferred from laboratories to hospitals, agriculture, industries and environment for practical applications. In spite of some major constrains, presently BAEC's activities have increased many folds and keeping in view of the overall power crisis of the country efforts have also been given to establish Nuclear Power Plant in the country. (author)

  7. 77 FR 8095 - Technical Corrections to Commission Regulations

    Science.gov (United States)

    2012-02-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 2 [Docket No. RM11-30-000; Order No. 756] Technical Corrections to Commission Regulations Issued February 8, 2012. AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule: correcting amendment. SUMMARY: This document adds...

  8. Report of the Nevada Commission on Nuclear Projects

    International Nuclear Information System (INIS)

    1986-11-01

    This summary represents the major conclusions reached by the Commission on Nuclear Projects. They reflect the Commission's experience with the high-level nuclear waste disposal program since 1985 and are the result of the Commission's scrutiny of both State and federal repository-related activities

  9. Research and development action of the Commission of the European Communities (CEC) in the field of radioactive waste management

    International Nuclear Information System (INIS)

    Orlowski, S.; Bresesti, M.

    1983-01-01

    The CEC R and D action, started in 1973, is carried out within the framework of cost-sharing contracts with Community organizations and in the laboratories of the Joint Research Centre, Ispra. About 350 research workers from 30 organizations within the Community are taking part. The R and D activities cover processing, conditioning, characterization, intermediate storage and final disposal of the radioactive wastes generated in reactors and in fuel reprocessing and fuel fabrication plants. In the Community, spent fuels are not considered as radioactive waste. About one half of the total effort has been devoted to the disposal of high-level and long-lived radioactive wastes in geological formations (granite, clay, salt) and to related studies. The sub-seabed disposal option is also being investigated with a more limited effort. The R and D activities on waste treatment cover low-level, alpha-bearing and gaseous wastes. An important activity has been developed on the characterization of vitrified HLW. A similar activity for the characterization of other types of conditioned wastes has been started. The R and D activity of the CEC is supported by the existence of a Community Plan of Action (1980-1992) which entrusts to the Commission a wider role in the development of waste management policies. The Plan assures in particular the continuity of the R and D work up to 1992. International co-operation is considered important; international symposia have been co-sponsored with the IAEA; co-operative agreements with non-Community countries are in force (such as with Canada) or in preparation (such as with the USA). (author)

  10. 18 CFR 388.104 - Informal advice from Commission staff.

    Science.gov (United States)

    2010-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Commission staff. (a) The Commission staff provides informal advice and assistance to the general public and... expressed by the staff do not represent the official views of the Commission, but are designed to aid the...

  11. The European Commission's light bulb decree: Another costly regulation?

    International Nuclear Information System (INIS)

    Frondel, Manuel; Lohmann, Steffen

    2011-01-01

    Since September 2009, Regulation 244/2009 of the European Commission enforces the gradual phase-out of incandescent light bulbs. As of September 2012, only energy-efficient lighting sources will be allowed for sale. Among these are halogen light bulbs, light-emitting diodes (LED), or compact fluorescent light bulbs-often referred to as energy-saving light bulbs. The Commission's justification for the phase-out of conventional light bulbs maintains that a reduction in the electricity consumed will not only lead to lower energy cost for private households and industrial consumers, but at the same time lead to a decrease in greenhouse gas emissions. This article discusses possible reasons for the slow market diffusion of energy-saving light bulbs and shows that the investment in energy-efficient light bulbs does not necessarily lead to significant cost reductions. Drawing on some illustrative examples, we demonstrate that the use of cheaper incandescent bulbs instead of energy-saving light bulbs can be economically rational in cases of rather low usage times, in which the higher initial purchasing price might only pay off after very long time spans. Furthermore, due to the coexistence with the European Emissions Trading Scheme (ETS), this regulation attains no additional emission reductions beyond those achieved by the ETS alone. We thus conclude that the general ban of incandescent light bulbs is inappropriate and should be abolished by the Commission. - Research highlights: → This article discusses reasons for the slow market diffusion of energy-saving light bulbs. → We show that using incandescent bulbs can be rational in cases of rather low usage times. → We conclude that the general ban of incandescent light bulbs should be abolished by the Commission.

  12. Commissioning of self-management support for people with long-term conditions: an exploration of commissioning aspirations and processes.

    Science.gov (United States)

    Reidy, Claire; Kennedy, Anne; Pope, Catherine; Ballinger, Claire; Vassilev, Ivo; Rogers, Anne

    2016-07-15

    To explore how self-management support (SMS) is considered and conceptualised by Clinical Commissioning Groups (CCGs) and whether this is reflected in strategic planning and commissioning. SMS is an essential element of long-term condition (LTC) management and CCGs are responsible for commissioning services that are coordinated, integrated and link into patient's everyday lives. This focus provides a good test and exemplar for how commissioners communicate with their local population to find out what they need. A multisite, quasi-ethnographic exploration of 9 CCGs. National Health Service (NHS) CCGs in southern England, representing varied socioeconomic status, practice sizes and rural and urban areas. Content analysis of CCG forward plans for mention of SMS. Semistructured interviews with commissioners (n=10) explored understanding of SMS and analysed thematically. The practice of commissioning explored through the observations of Service User Researchers (n=5) attending Governing Body meetings (n=10, 30 hours). Observations illuminate the relative absence of SMS and gateways to active engagement with patient and public voices. Content analysis of plans point to tensions between local aspirations and those identified by NHS England for empowering patients by enhancing SMS services ('person-centred', whole systems). Interview data highlight disparities in the process of translating the forward plans into practice. Commissioners reference SMS as a priority yet details of local initiatives are notably absent with austerity (cost-containment) and nationally measured biomedical outcomes taking precedence. Commissioners conceptualise locally sensitive SMS as a means to improve health and reduce service use, but structural and financial constraints result in prioritisation of nationally driven outcome measures and payments relating to biomedical targets. Ultimately, there is little evidence of local needs driving SMS in CCGs. CCGs need to focus more on early strategic

  13. Educational Change by Commission: Attempting "Trickle Down" Reform.

    Science.gov (United States)

    Ginsberg, Rick; Wimpelberg, Robert K.

    1987-01-01

    The processes and procedures of national commissions on education are discussed. Elements of commonality are presented with a review of competing explanations of the popularity of such commissions. A sociopolitical thesis of educational reform through commissions is advanced, based on the "trickle down" theory of economics. (SLD)

  14. 77 FR 58941 - Appeal Proceedings Before the Commission

    Science.gov (United States)

    2012-09-25

    ... forth more specific rules for the different types of appeals. Rules for appeals of ordinance..., 582, 583, 584, and 585 RIN 3141-AA47 Appeal Proceedings Before the Commission AGENCY: National Indian... Commission) promulgates this final rule to enhance and clarify appeal proceedings before the Commission. This...

  15. Horizontal mergers and weak and strong competition commissions

    Directory of Open Access Journals (Sweden)

    Ristić Bojan

    2014-01-01

    Full Text Available In this paper we analyse the horizontal merger of companies in an already concentrated industry. The participants in mergers are obliged to submit notification to the Competition Commission but they also have the option of rejecting the merger. At the time of the notification submission the participants do not know whether the Commission is strong or weak, and they can complain to the Court if the Commission prohibits the merger. We model the strategic interaction between Participants and Commission in a dynamic game of incomplete information and determine weak perfect Bayesian equilibria. The main finding of our paper is that Participants will base their decision to submit notification on their belief in a weak Commission decision and will almost completely ignore the possibility of a strong Commission decision. We also provide a detailed examination of one case from Serbian regulatory practice, which coincides with the results of our game theoretical model.

  16. Large Hadron Collider commissioning and first operation.

    Science.gov (United States)

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  17. Study on Pressure drop for Ion Exchanger in Jordan Research and Training Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Park, Ki-jung; Choi, Jungwoon; Kim, Seong-Hoon; Chi, Dae-Young; Park, Cheol [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    The Jordan Research and Training Reactor (JRTR) is currently being constructed and commissioned in the JUST (Jordan University of Science and Technology) site. The main fluid systems relevant to the JRTR have been proceeding at the Korea Atomic Energy Research Institute. In order to achieve the purpose of the pool water purification, two filters and two ion exchangers which can be to remove suspended solids and ionic impurities in the in-taken pool water have been designed. For the reliable design of this system pump, it is important to predict the pressure drop of the system equipment including the ion exchanger. In this study, the pressure drop in the ion exchanger of PWMS is predicted by using the well-known model and the results provided from manufacturing company. And, the calculated results are compared to the actual data which is measured from the ion exchanger during the PWMS commissioning. The predicted pressure drop is dominated by the resin bed as a portion of about 85% for total pressure drop. The predicted pressure drop is compared to the measured pressure drop of the ion exchanger which is installed in the JRTR, the data above 5 kg/s agree within 5% in the entire range.

  18. 17 CFR 9.26 - Participation of Commission staff.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Participation of Commission staff. 9.26 Section 9.26 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES... Respect to Appeals § 9.26 Participation of Commission staff. Within twenty days after receipt of the...

  19. 32 CFR 700.873 - Inspection incident to commissioning of ships.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Inspection incident to commissioning of ships... Inspection incident to commissioning of ships. When a ship is to be commissioned, the authority designated to place such ship in commission shall, just prior to commissioning, cause an inspection to be made to...

  20. Permanent Commission for Health and Safety

    CERN Multimedia

    Association du personnel

    2007-01-01

    The mandate of the Staff Association's permanent commission for Health and Safety is to examine all aspects of health and safety related to the working environment at CERN. In no way does it wish to be a substitute for the official bodies that are responsible for these matters. The Commission's aim is to formulate remarks on and make proposals about these questions to the relevant bodies and the CERN Management. Its main focus is the safety of the CERN staff but it is also concerned with the safety of the installations and of the CERN environment. The Commission reports to the Staff Council and the Executive Committee of the Staff Association.

  1. Residential ventilation standards scoping study

    Energy Technology Data Exchange (ETDEWEB)

    McKone, Thomas E.; Sherman, Max H.

    2003-10-01

    The goals of this scoping study are to identify research needed to develop improved ventilation standards for California's Title 24 Building Energy Efficiency Standards. The 2008 Title 24 Standards are the primary target for the outcome of this research, but this scoping study is not limited to that timeframe. We prepared this scoping study to provide the California Energy Commission with broad and flexible options for developing a research plan to advance the standards. This document presents the findings of a scoping study commissioned by the Public Interest Energy Research (PIER) program of the California Energy Commission to determine what research is necessary to develop new residential ventilation requirements for California. This study is one of three companion efforts needed to complete the job of determining the ventilation needs of California residences, determining the bases for setting residential ventilation requirements, and determining appropriate ventilation technologies to meet these needs and requirements in an energy efficient manner. Rather than providing research results, this scoping study identifies important research questions along with the level of effort necessary to address these questions and the costs, risks, and benefits of pursuing alternative research questions. In approaching these questions and corresponding levels of effort, feasibility and timing were important considerations. The Commission has specified Summer 2005 as the latest date for completing this research in time to update the 2008 version of California's Energy Code (Title 24).

  2. Commission of the European Communities - Activities in the field of fast reactors

    International Nuclear Information System (INIS)

    Balz, W.

    1977-01-01

    The Commission of the European Communities is performing activities in the field of fast reactor on two lines: a) activities aiming to prepare the commercialization of fast reactors by coordination and collaboration between national programmes. b) the execution of an own programme in the Joint Research Centre at Ispra (Italy) and Karlsruhe (Federal Republic of Germany) in the field of FBR safety and research on Pu-bearing fuel

  3. DESY: HERA commissioning

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The commissioning of the world's first electron-proton collider - the 6.3 kilometre HERA ring at the DESY Laboratory in Hamburg - last year was the result of more than a decade of careful planning, design and construction

  4. Alberta Petroleum Marketing Commission annual report, 1991

    International Nuclear Information System (INIS)

    1992-04-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. In 1991, the middle east crisis caused prices to spike at the commencement of the Gulf war, but these quickly stabilized. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, down 1.5% from 1990, and receipts of heavy crude were 6.1 million bbl, up 5% from 1990. Revenue from crude oil sales was $1,642,244,000, down from $2,078,197,000 in 1990. Loss of the Montreal market through pipeline closure led to increased pressure on prices, particularly on heavy crudes. The Commission's natural gas activities in 1991 included price determination and information collection. 9 figs., 1 tab

  5. Preparation of physics commissioning of Mochovce units 3 and 4

    International Nuclear Information System (INIS)

    Sedlacek, M.; Chrapciak, V.

    2010-01-01

    The Project 'Mochovce Units 3 and 4 Completion' started in 2009 and it will be finished in 2013. VUJE, Inc. is one of the five main Project contractors for the Nuclear Island and it is responsible, inter alia, for Mochovce Units 3 and 4 commissioning. The commissioning of Units 3 and 4 includes the stages of Physics Commissioning and Power Commissioning. This paper deals with the preparation of Mochovce Units 3 and 4 Physics Commissioning. In the paper there is presented a preparation of some commissioning documents, e.g. 'Quality Assurance Programme', 'Commissioning Programme', 'Stage Programme for Physics Commissioning', 'Test working programmes', 'Neutron-physics characteristics for Physics and Power Commissioning', etc. The scope of Physics Commissioning is presented by list of tests. For assessment of tests results so-called three-level acceptance criteria will be applied: realization, design and safety criteria. In the paper there are also presented computer codes, which will be used for neutron-physics characteristics calculation and the fuel loading scheme for the reactor core of Mochovce Unit 3. (Authors)

  6. Discussion: European Commission policy

    International Nuclear Information System (INIS)

    Coldwell, R.

    1993-01-01

    This paper documents the debate which arose following two papers presented to a seminar run by the Centre for the Study of Regulated Industries, on 11th November 1992, on European Commission (EC) energy policies. The issues raised cover how an internal market for electricity and natural gas will be implemented under a proposed EC directive, bearing in mind the level of opposition from a number of Member States. How this Directive will apply to vertically integrated structures, such as Scottish Electricity Industry, is also considered. (UK)

  7. Reduced emissions of greenhouse gases 2050: Technological wedges - Input to the Commission on Low Emissions

    International Nuclear Information System (INIS)

    Rosenberg, Eva; Espegren, Kari Aamodt; Finden, Per; Hageman, Rolf; Stenersen, Dag

    2006-09-01

    The Commission on Low Emissions was established in March 2005 and has been charged with the task of describing how Norway can achieve a 50-80 percent reduction in emissions of greenhouse gases by 2050. The commission describes the desired total reduction in emissions to be a set of actions or 'wedges', meaning that the reduction in emissions are linked to an array of technological and behavioural changes. The technological wedges are described here, while the behavioural wedges are treated in a different report. The potentials described are based on the Low Emission's reference line. Possible changes in the reference line will result in changed potentials. The technological wedges studied comprise to a great extent a potential of 50-80 percent reduction in greenhouse gases by 2050. This depends on considerable effort from research and development, and a determination to change external conditions

  8. Activity report of the Commission for Grid Perspectives

    International Nuclear Information System (INIS)

    Mignon, Herve; Rabouche, Ikram

    2015-01-01

    After an introduction by the Commission chairman, this report briefly evokes actions undertaken in cooperation with other actors: Meteo France for climate scenarios, Artelys and Enea consulting for a study on the potential of energy storage, Maias Eolis for its tools of management of wind energy variability, the French-German office for renewable energies for its report on challenges for renewable energies in Germany, and the Ancre for the presentation of long term energetic scenarios. It discusses how the Commission is a privileged body for the consultation about RTE's prospective visions, as well as far as data transparency is concerned

  9. Commissioning of the double Penning trap system MLLTRAP and first studies on mass-dependent systematic uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Krug, Kevin; Weber, Christine; Thirolf, Peter G.; Szerypo, Jerzy; Gartzke, Eva; Habs, Dietrich [Fakultaet fuer Physik, LMU Muenchen (Germany); Kolhinen, Veli [Fakultaet fuer Physik, LMU Muenchen (Germany); Department of Physics, University of Jyvaeskylae (Finland)

    2010-07-01

    The cylindrical double Penning trap system MLLTRAP in its commissioning phase at the Maier-Leibnitz-Laboratory (MLL) Tandem accelerator in Garching is designed to perform high-accuracy mass measurements on fusion-reaction products. As the mass uncertainty is inversely proportional to the ionic charge state, the ions of interest will be charge bred prior to injection into the Penning trap system. In the future setup, both traps are foreseen to be operated as measurement traps with a relative homogeneity of the magnetic field at the trapping sites of {delta}B/B{<=}0.3 ppm. In the commissioning phase, an offline surface ionization source is used for iterative optimization of the apparatus and studies on mass-dependent systematic uncertainties. Mass measurements via the time-of-flight ion cyclotron resonance method (TOF-ICR) of reference ions with well-known masses ({sup 85}Rb, {sup 87}Rb, {sup 39}K, {sup 133}Cs) were carried out to analyze mass-dependent systematic effects. Together with previous studies on the uncertainty due to magnetic-field fluctuations the current status with respect to the limits of mass accuracy of the apparatus is presented.

  10. New body starts independent advisory work for EU Commission

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The new European Science and Technology Assembly (ESTA) had its first General Assembly on 6-7 September in Brussels. According to Commissioner A. Ruberti, the European Union's 'Minister' for science, technology and higher education, who has been largely responsible for ESTA's creation, the tasks of the new and independent Assembly of Scientists are to give opinions and advice and to help the European Commission implement the EU research policy

  11. Ninth Semiannual Report of the Commission to the Congress, July - December 1950. January 1951

    Energy Technology Data Exchange (ETDEWEB)

    Dean, Gordon; Glennan, T. Keith; Murray, Thomas E.; Pike, Sumner T.; Smyth, H. D.

    1951-01-31

    The document represents the ninth semiannual Atomic Energy Commission (AEC) report to Congress. The report sums up the major activities and developments in the national atomic energy program. This ninth report gives a summary of the year's program operations insofar as they can be reported within the limits of national security. It provides as well a brief review of the methods which the Commission follows in contracting with industries, research institutions, and with universities and colleges for the carrying on of the many phases of the national atomic energy program.

  12. The review of constitutional norms concerning local public administration in the view of the European Commission for Democracy through Law (Venice Commission)

    OpenAIRE

    Apostolache, Mihai

    2015-01-01

    The proposals of the Commission to review the Constitution of Romania were subject to the analysis of experts from the European Commission for Democracy through Law (the Venice Commission), who expressed their opinion in a report adopted at the 98th plenary session of the European body. The article analyzes the recommendations of the Venice Commission regarding the proposed changes to the constitutional norms governing local public administration, comprising some general aspects concern...

  13. Members of the Science and Technology Commission, Spanish Senate

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    Photo 01: (left to right) Mr Francisco Xabier Albistur, Senator; Mrs Mercedes Senen, Lawyer of the Commission; Mr Ramon Antonio Socias, Second Vice-President of the Commission; Prof. Luciano Maiani, CERN Director-General, Mr Alonso Arroyo, President of the Commission, signing the VIP visitors' book; and Mr Adolfo Abejon, Senator. Photo 02: Mr Alonso Arroyo, President of the Commission, signing the VIP visitors' book. Photos 03, 04: Mr Ramon Antonio Socias, Second Vice-President of the Commission, signing the VIP visitors' book; and Mr Adolfo Abejon, Senator. Photo 05: Mr Francisco Xabier Albistur, Senator, signing the VIP visitors' book. Photo 06: Mrs Mercedes Senen, Lawyer of the Commission, signing the VIP visitors' book. Photo 07: (left to right) Mr Francisco Xabier Albistur, Senator; Prof. Juan Antonio Rubio, Education and Technology Transfer Division Leader; Prof. Luciano Maiani, CERN Director-General; Mr Ramon Antonio Socias, Second Vice-President of the Commission; Mr Alonso Arroyo, President of the C...

  14. Risoe Research Establishment, Denmark

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1973-07-01

    On the poetic Roskilde Fjord, 40 kilometers from Copenhagen, and near Roskilde, capital of Denmark in the 12th century, stands the Risoe Research Establishment of the Danish Atomic Energy Commission. ere 700 men and women are engaged in searching for ways in which atomic energy can be used to make the world a better and healthier place. The work at Risoe comprises fundamental research, reactor technology and other technological studies, agricultural research and health and safety studies. Nuclear power stations are scheduled to be operative in Denmark some time between 1975 and 1980, and the planning of these stations and development of the many processes this will involve has become a major task at Risoe. Special conditions have to be fulfilled in selecting the site of an atomic research station, and the barren Risoe peninsula had them all: safety, because the site was free from buildings to permit continuous control; closeness to the scientific institutions of the capital, Copenhagen; social amenities in Roskilde; finally, access to an a adequate water supply. his special series of photos covering some aspects of the work and safety conditions at Risoe was commissioned by WHO. (author)

  15. Risoe Research Establishment, Denmark

    International Nuclear Information System (INIS)

    1973-01-01

    On the poetic Roskilde Fjord, 40 kilometers from Copenhagen, and near Roskilde, capital of Denmark in the 12th century, stands the Risoe Research Establishment of the Danish Atomic Energy Commission. ere 700 men and women are engaged in searching for ways in which atomic energy can be used to make the world a better and healthier place. The work at Risoe comprises fundamental research, reactor technology and other technological studies, agricultural research and health and safety studies. Nuclear power stations are scheduled to be operative in Denmark some time between 1975 and 1980, and the planning of these stations and development of the many processes this will involve has become a major task at Risoe. Special conditions have to be fulfilled in selecting the site of an atomic research station, and the barren Risoe peninsula had them all: safety, because the site was free from buildings to permit continuous control; closeness to the scientific institutions of the capital, Copenhagen; social amenities in Roskilde; finally, access to an a adequate water supply. his special series of photos covering some aspects of the work and safety conditions at Risoe was commissioned by WHO. (author)

  16. Commissioning for the European XFEL facility

    Science.gov (United States)

    Nölle, D.

    2017-06-01

    The European XFEL is a 4th generation light source based on the Self Amplified Spontaneous Emission (SASE) FreeElectron-Laser concept. It is currently being commissioned in North- Germany. The core installation is a 17.5 GeV superconducting accelerator driving 3 SASE lines with photon energies from 1 to beyond 20 keV range with a maximum of 27.000 pulses per second. The international facility is organized as a limited liability company with shareholders from the contributing countries. DESY has taken over the leadership of the accelerator construction consortium, and will be in charge of the operation of the accelerator complex. The facility was set up with contributions from the 11 shareholder countries, either being hardware systems and/or staff or cash contributions. The construction is almost complete, and the commissioning phase has started by the end of 2015. This contribution will report the status of the accelerator complex with emphasis on the commissioning of the accelerator and an outlook to the commissioning of the SASE 1 FEL line.

  17. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    D. Acosta

    Point 5 commissioning activities Since the last CMS week there has been little global commissioning activities: the first mid week global run aiming to assess the status of the hardware and DAQ software after the winter maintenance and developments has taken place two weeks ago involving all subdetectors but tracker and pixel whose hardware is still being actively worked on. The local commissioning restarted once the cooling became available again the third week of January. Below are detailed the main activities which have taken place so far. DAQ The activity of the central DAQ group during pause of global runs was focused on various items. The commissioning of the 900 new PCs which will be used to run the HLT processes has been almost completed. It is planned to use these PCs in the first global run at the start of March. In addition the location of various server PCs which host essential functionalities to get the private ".cms" network going, has been re-organized to allow to implemen...

  18. Powers and Duties of Corporate Affairs Commission

    African Journals Online (AJOL)

    Mofasony

    POWERS AND DUTIES OF THE CORPORATE AFFAIRS. COMMISSION ... The Registrar-General is the Chief Executive of the Commission and is saddled .... Federal Board of Inland Revenue Department of the Ministry of Finance v). Register ...

  19. Commissioning quality assurance at Pickering NGS

    International Nuclear Information System (INIS)

    Wieckowski, J.T.

    1983-05-01

    Ontario Hydro decided in 1978 to implement a formal quality assurance program applicable to commissioning and operation of nuclear generating stations. Pickering NGS is the first station to have the commissioning quality assurance (CQA) program applied to it. This paper outlines the scope, implementation, and evaluation of the CQA program as applied to Pickering Unit 5

  20. Nuclear Regulatory Commission: more aggressive leadership needed

    International Nuclear Information System (INIS)

    Staats, E.B.

    1980-01-01

    The Energy Reorganization Act of 1974 which established the Nuclear Regulatory Commission required GAO to evaluate the Commission's performance by January 18, 1980. This report responds to that requirement. GAO concluded that, although improvements have been made, the Commission's nuclear regulatory performance can be characterized best as slow, indecisive, cautious - in a word, complacent. This has largely resulted from a lack of aggressive leadership as evidenced by the Commissioners' failure to establish regulatory goals, control policymaking, and most importantly, clearly define their roles in nuclear regulation

  1. Research priorities at the European Commission in relation to maintenance optimization and nuclear power plant life management

    International Nuclear Information System (INIS)

    Contri, Paolo

    2009-01-01

    Analysis of experience in many countries operating nuclear power plants (NPPs) suggests that, while differences in long term operation (LTO) programs are mainly related to the various national regulatory processes, the main features and basic technical requirements are similar. The implementation of these however needs reshaping in an integrated plant life management (PLIM) framework, bearing in mind the specific safety implications of LTO. R and D is essential to support this process, not only for long term extrapolation of the component integrity and behaviour, but also for a proper maintenance system and for an adequate management structure ensuring effective management strategies at plant level, able to address organisational issues, spare part management, staff ageing, component obsolescence, etc. This is recognised by the European Commission, which supports R and D in targeted areas in the framework of the EURATOM programme, both by “direct actions” i.e. projects managed and executed by its Directorate General Joint Research Centers (JRC) and by indirect actions i.e. funding of selected projects, managed by the Directorate General Research (RTD). This paper outlines the JRC's priorities in the current 7th Framework Programme in relation to R and D tasks for maintenance and ISI to support the highest safety level at member's NPPs and appropriate decision-making tools for the optimisation of these programs. A newly developed UE model for PLIM, also integrating maintenance optimisation issues, is presented for further discussion. (author)

  2. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    The major progress made during the last months has been in the consolidation of services for the +endcaps and three barrel wheels (YB+2, YB+1 and YB0): all subdetectors have now final power connections (including Detector Safety protection), the gas systems have been commissioned for all gas detectors (the recirculation is not yet activated for the RPC though) and detector cooling has also been commissioned. Their integration with final services is the necessary condition for being able to operate larger fractions the detector. Recent weeks have seen full HCAL, more than 50% of EB and full wheels of DTs and CSC being operated using final services. This has not yet translated into major progress of global integration due to major interruptions of central services, which have not allowed the necessary debugging and commissioning time to all the subdetec¬tors and central activities like DAQ and trigger. Moreover the running in of the final central services has introduced instabilities related to the co...

  3. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    P5 Commissioning activities The commissioning effort at the pit has made major progress since the last CMS week concerning the installation and operation of the off-detector electronics in USC. The progress has been much slower in the experi¬mental cavern due to the delay in the deployment of the infrastructure which should eventually allow safe powering-up of the front ends. Nevertheless, temporary power connections have allowed operation of slices of subdetectors at any given time. HF, HE, ECAL, DTs, RPCs and CSCs have carried out local commissioning tests with these temporary services. The status of hardware deployment in USC and on the towers/balconies is represented in the detailed table below.   Table 1: Status of installation of off-detector electronics. FEDs are detector dependent hardware modules which perform the first ‘colla¬tion’ of front-end data and send it to Central-data for event building. Tracker, ECAL, HCAL have their front end electronics mo...

  4. Photon beam commissioning of an Elekta Synergy linear accelerator

    Science.gov (United States)

    Al Mashud, Md Abdullah; Tariquzzaman, M.; Jahangir Alam, M.; Zakaria, GA

    2017-12-01

    The aim of this study is to present the results of commissioning of Elekta Synergy linear accelerator (linac). The acceptance test and commissioning were performed for three photon beams energies 4 MV, 6 MV and 15 MV and for the multileaf collimator (MLC). The percent depth doses (PDDs), in-plane and cross-plane beam profiles, head scatter factors (Sc), relative photon output factors (Scp), universal wedge transmission factor and MLC transmission factors were measured. The size of gantry, collimator, and couch isocenter were also measured.

  5. Stepwise commissioning of a steam boiler with stability guarantees

    DEFF Research Database (Denmark)

    Johansen, Simon Vestergaard; Kallesøe, Carsten Skovmose; Bendtsen, Jan Dimon

    2016-01-01

    This paper aims to make the commissioning of an industrial MIMO controller more straightforward by gradually commissioning it from a set of SISO controllers, after the system has been started. For this purpose a stepwise commissioning strategy based on the Youla-Kucera parametrization has been de...... been commissioned from a SISO controller using the developed method on a real steam boiler and measurements show a clear performance improvement after transition....

  6. C46 `ASTRONOMY Education and Development': a Peculiar Commission

    Science.gov (United States)

    de Greve, Jean-Pierre; García, Beatriz; Gerbaldi, Michèle; Ferlet, Roger; Guinan, Edward; Hearnshaw, John; Jones, Barrie; Marschall, Laurence; Miley, George; Pasachoff, Jay; Ros, Rosa; Stavinschi, Magda; Torres-Peimbert, Silvia

    2016-04-01

    C46 was a Commission of the Executive Committee of the IAU under Division XII (Union-Wide Activities), then after 2012 under Division C (Education, Outreach, and Heritage). It was the only commission dealing exclusively with astronomy education; a previous Commission 38 (Exchange of Astronomers), which allocated travel grants to astronomers who needed them, and a Working Group on the Worldwide Development of Astronomy, have been absorbed by Commission 46.

  7. Case study of the interdisciplinary integration in an IST-E3 project

    DEFF Research Database (Denmark)

    Jørgensen, Ulrik

    2002-01-01

    Case study of a specific IST-E3 project funded by the EU commissions 5th framework program. The case study highlights the difficulties in integrating different disciplinary approaches and suggests that a more openended research strategy should be applied by the commission.......Case study of a specific IST-E3 project funded by the EU commissions 5th framework program. The case study highlights the difficulties in integrating different disciplinary approaches and suggests that a more openended research strategy should be applied by the commission....

  8. Research laboratories annual report 1994

    International Nuclear Information System (INIS)

    1996-01-01

    The publication is the 1994 annual report of the Israel atomic energy commission in a new format. The report includes three invited papers and a bibliographic list of publications by the commission scientific researches

  9. Research laboratories annual report 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The publication is the 1994 annual report of the Israel atomic energy commission in a new format. The report includes three invited papers and a bibliographic list of publications by the commission scientific researches.

  10. Involving stakeholders in policy research should not imply that they control the problem definition: lessons from a case study on new analgesics

    NARCIS (Netherlands)

    Moret-Hartman, M.; van der Wilt, G.J.; Grin, J.

    2009-01-01

    The Dutch Health Care Insurance Board (HCIB) commissions research to guide their policy recommendations. However, the studies conducted do not always yield relevant information. This may result from differences in problem definitions held by the HCIB and target populations. To compensate these

  11. Commissioning the Linac Coherent Light Source injector

    Directory of Open Access Journals (Sweden)

    R. Akre

    2008-03-01

    Full Text Available The Linac Coherent Light Source is a SASE x-ray free-electron laser (FEL project presently under construction at SLAC [J. Arthur et al., SLAC-R-593, 2002.]. The injector section, from drive laser and rf photocathode gun through first bunch compressor chicane, was installed in the fall of 2006. The initial system commissioning with an electron beam was completed in August of 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photocathode drive laser, rf gun, photocathode, S-band and X-band rf systems, first bunch compressor, and the various beam diagnostics.

  12. Motivation and values of European Commission staff. Paper

    NARCIS (Netherlands)

    Vandenabeele, W.V.; Ban, C.

    2009-01-01

    The concept of public service motivation has been central to the discussion of motivation in the field of public management but has never been studied in international organizations. This paper reports on a preliminary study of motivational issues within the European Commission, including motivation

  13. Commissioning quality assurance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig.

  14. Commissioning quality assurance for nuclear power plants

    International Nuclear Information System (INIS)

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig

  15. Surrogacy commissioning fathers and HIV

    OpenAIRE

    Jordaan, D W

    2014-01-01

    Surrogacy is not regulated by a single legal instrument only, nor is confirmation of a surrogacy agreement by the High Court an unqualified green light for the surrogacy process to proceed. In the context of the HIV status of the commissioning father, whose gametes are to be used for the conception of the child in pursuance of a surrogacy agreement, the intended in vitro fertilisation of the surrogate mother may only take place on condition that the commissioning father, and his semen, have b...

  16. Research laboratories annual report 1993

    International Nuclear Information System (INIS)

    1994-08-01

    The 1993 annual report of the Israel Atomic Energy Commission presents, in brief and concise form, recent results and achievements of the well established program of the basic and applied research carried out by the scientists and engineers of the Israel Atomic Energy Commission in collaboration with colleagues at the other institutions in Israel and abroad. In terms of contents, the report presents the usual combination of topical basic applied research. Much of the work has been published or submitted for publication in the international scientific or technical literature. The main headings in the report are: theoretical physics and theoretical chemistry; optics and lasers; solid states and nuclear physics; materials sciences; chemistry; environmental studies and radiopharmaceuticals; radiation effects, dosimetry and radioprotection; and instrumentation and techniques

  17. Ghana Space Science and Technology Institute (GSSTI),Ghana Atomic Energy Commission: Annual Report 2013/2014

    International Nuclear Information System (INIS)

    2014-01-01

    The report presents the structure as well as the research projects of the newly established Ghana Space Science and Technology Institute of the Ghana Atomic Energy Commission from January to December 2014. Research projects listed are in the areas of Astronomy and Astrophysics; Remote Sensing; Electronics and Instrumentation; and Satellite Communication.

  18. The Australian Royal Commission into Institutional Responses to Child Sexual Abuse.

    Science.gov (United States)

    Wright, Katie; Swain, Shurlee; McPhillips, Kathleen

    2017-12-01

    The Royal Commission into Institutional Responses to Child Sexual Abuse is the largest royal commission in Australia's history and one of the largest public inquiries into institutional child abuse internationally. With an investment from the Australian government of half a billion dollars, it examined how institutions with a responsibility for children, both historically and in the present, have responded to allegations of child sexual abuse. Announced in the wake of previous Australian and international inquiries, public scandals and lobbying by survivor groups, its establishment reflected increasing recognition of the often lifelong and intergenerational damage caused by childhood sexual abuse and a strong political commitment to improving child safety and wellbeing in Australia. This article outlines the background, key features and innovations of this landmark public inquiry, focusing in particular on its extensive research program. It considers its international significance and also serves as an introduction to this special edition on the Australian Royal Commission, exploring its implications for better understanding institutional child sexual abuse and its impacts, and for making institutions safer places for children in the future. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  19. Summarisation of construction and commissioning experience for nuclear power integrated test facility

    International Nuclear Information System (INIS)

    Xiao Zejun; Jia Dounan; Jiang Xulun; Chen Bingde

    2003-01-01

    Since the foundation of Nuclear Power Institute of China, it has successively designed various engineering experimental facilities, and constructed nuclear power experimental research base, and accumulated rich construction experiences of nuclear power integrated test facility. The author presents experience on design, construction and commissioning of nuclear power integrated test facility

  20. 75 FR 73083 - Sunshine Act Meeting; Open Commission Meeting

    Science.gov (United States)

    2010-11-29

    ... FEDERAL COMMUNICATIONS COMMISSION Sunshine Act Meeting; Open Commission Meeting November 30, 2010. The Federal Communications Commission will hold an Open Meeting on the subjects listed below on... demonstrate accessibility technologies. The meeting site is fully accessible to people using wheelchairs or...

  1. 75 FR 2114 - Military Leadership Diversity Commission (MLDC); Meeting

    Science.gov (United States)

    2010-01-14

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission (MLDC....150, the Department of Defense announces that the Military Leadership Diversity Commission (MLDC) will... commissioners of the Military Leadership Diversity Commission to continue their efforts to address congressional...

  2. Overall review strategy for the Nuclear Regulatory Commission's High-Level Waste Repository Program

    International Nuclear Information System (INIS)

    Johnson, R.L.

    1994-11-01

    The Overall Review Strategy gives general guidance to the Nuclear Regulatory Commission staff for conducting it's license application and pre-license application reviews. These reviews are in support of the Commission's construction authorization decision for a geologic repository for the disposal of high-level radioactive waste. Objectives and strategies are defined that focus the staff's reviews on determining compliance with requirements of 10 CFR Part 60. These strategies define how the staff prioritizes its reviews on those key technical uncertainties considered to be most important to repository performance. Strategies also give guidance for developing, in an integrated way, the License Application Review Plan together with supporting performance assessments, analyses, and research

  3. Regulatory Commission of Alaska

    Science.gov (United States)

    Map Help Regulatory Commission of Alaska Login Forgot Password Arrow Image Forgot password? View Cart login Procedures for Requesting Login For Consumers General Information Telephone Electric Natural Gas

  4. 36 CFR 401.6 - Approval by National Commission of Fine Arts.

    Science.gov (United States)

    2010-07-01

    ... Commission of Fine Arts. 401.6 Section 401.6 Parks, Forests, and Public Property AMERICAN BATTLE MONUMENTS COMMISSION MONUMENTS AND MEMORIALS § 401.6 Approval by National Commission of Fine Arts. A design for a... Commission of Fine Arts before the Commission can accept it. ...

  5. 18 CFR 375.102 - Custody and authentication of Commission records.

    Science.gov (United States)

    2010-04-01

    ... authentication of Commission records. 375.102 Section 375.102 Conservation of Power and Water Resources FEDERAL... Provisions § 375.102 Custody and authentication of Commission records. (a) Custody of official records. (1...) Authentication of Commission action. All orders and other actions of the Commission shall be authenticated or...

  6. Methods and quality assurance in environmental medicine. Formation of a RKI-Commission

    International Nuclear Information System (INIS)

    Eis, D.

    2000-01-01

    An almost bewildering number of widely differing methods and techniques, often not validated, are being applied often inappropriately in the field of environmental medicine to answer questions regarding exposure assessment, diagnosis, treatment, counselling and prevention. Therefore, quality control within the field of environmental medicine is quite problematic. A primary goal of the newly formed RKI-Commission 'Methods and Quality Assurance in Environmental Medicine' is to form a panel of experts in the field, who evaluate the situation and generate consensus documents containing respective recommendations. By this the commission will contribute to standardization and agreement on appropriate methods, procedures and their correct application in the practice of environmental medicine. Hopefully it will also achieve a stronger, more consistent use of evidence-based-medicine and improve the quality of the structure, processes and results of research and practice in this field. The committee will initially deal with the issue of clinical environmental medicine, because here the largest problems in quality assurance are seen. In this context the commission will look at the problem areas of environmental-medical outpatient units and environmental clinics. The work of the commission will be supported by the newly formed Documentation and Evaluation Center for Methods in Environmental Medicine (Zentrale Erfassungs- und Bewertungsstelle fuer umweltmedizinische Methoden, ZEBUM) at the Robert Koch Institute. (orig.) [de

  7. Commissioning for Humidified Buildings

    National Research Council Canada - National Science Library

    Deal, Brian

    1998-01-01

    .... Although proper commissioning procedures have been noted to reduce the potential for approximately 70 percent of these claims, no standards exist for the control of moisture migration in building...

  8. Commissioning of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(CDS)2069446

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focusing on simultaneous running and combined track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  9. A study on the operator's errors of commission (EOC) in accident scenarios of nuclear power plants: methodology development and application

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Whan; Jung, Won Dea; Park, Jin Kyun; Kang, Da Il

    2003-04-01

    As the concern on the operator's inappropriate interventions, the so-called Errors Of Commission (EOCs), that can exacerbate the plant safety has been raised, much of interest in the identification and analysis of EOC events from the risk assessment perspective has been increased. Also, one of the items in need of improvement for the conventional PSA and HRA that consider only the system-demanding human actions is the inclusion of the operator's EOC events into the PSA model. In this study, we propose a methodology for identifying and analysing human errors of commission that might be occurring from the failures in situation assessment and decision making during accident progressions given an initiating event. In order to achieve this goal, the following research items have been performed: Firstly, we analysed the error causes or situations contributed to the occurrence of EOCs in several incidents/accidents of nuclear power plants. Secondly, limitations of the advanced HRAs in treating EOCs were reviewed, and a requirement for a new methodology for analysing EOCs was established. Thirdly, based on these accomplishments a methodology for identifying and analysing EOC events inducible from the failures in situation assessment and decision making was proposed and applied to all the accident sequences of YGN 3 and 4 NPP which resulted in the identification of about 10 EOC situations.

  10. Commissioning and Operational Experience in Power Reactor Fuel Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Pradhan, S., E-mail: spradhan@barctara.gov.in [Tarapur Based Reprocessing Plant, Bhabha Atomic Research Centre, Tarapur (India)

    2014-10-15

    After completing design, construction, commissioning, operation and maintenance experience of the reprocessing plants at Tarapur, Mumbai and Kalpakkam a new reprocessing plant is commissioned and put into operation at BARC, Tarapur since 2011. Subsequent to construction clearance, commissioning of the plant is taken in many steps with simultaneous review by design and safety committees. In spite of vast experience, all the staff was retrained in various aspects of process and utility operations and in operation of innovative changes incorporated in the design. Operating personnel are licensed through an elaborate procedure consisting of various check lists followed by personnel interview. Commissioning systems were divided in sub-systems. Sub-systems were commissioned independently and later integrated testing was carried out. For commissioning, extreme operating conditions were identified in consultation with designers and detailed commissioning procedures were made accordingly. Commissioning was done in different conditions to ensure safety, smooth operation and maintainability. Few modifications were carried out based on commissioning experience. Technical specifications for operation of the plant are made in consultation with designers and reviewed by safety committees. Operation of the plant was carried out after successful commissioning trials with Deep Depleted Uranium (DDU). Emergency operating procedures for each design basis accident were made. Performance of various systems, subsystems are quite satisfactory and the plant has given very good capacity factor. (author)

  11. Commissioning of specialist palliative care services in England.

    Science.gov (United States)

    Lancaster, Harriet; Finlay, Ilora; Downman, Maxwell; Dumas, James

    2018-03-01

    Some failures in end-of-life care have been attributed to inconsistent provision of palliative care across England. We aimed to explore the variation in commissioning of services by Clinical Commissioning Groups (CCGs) using a data collection exercise. We sent a Freedom of Information request in the form of an open questionnaire to all 209 CCGs in England to assess their commissioning of palliative and end-of-life care services, mainly focused on the provision of specialist palliative care services. 29 CCGs provided information about the number of patients with some form of palliative care needs in their population. For specialist palliative care services, CCGs allocated budgets ranging from £51.83 to £2329.19 per patient per annum. 163 CCGs (77.90%) currently commission 7-day admission to their specialist palliative care beds. 82.84% of CCGs commission 7-day specialist palliative care services in patients' own homes and out-of-hours services rely heavily on hospice provision. 64 CCGs (31.37%) commission pain control teams, the majority of whom only operate in regular working hours. 68.14% of CCGs reported commissioning palliative care education of any sort for healthcare professionals and 44.85% of CCGs had no plans to update or review their palliative care services. The most important finding from this exercise is that the information CCGs hold about their population and services is not standardised. However, information based on data that are more objective, for example, population and total budget for palliative care, demonstrate wide variations in commissioning. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  12. Textbooks evaluations in the National Textbook Commission: the school knowledge conformation in the 1940’s

    Directory of Open Access Journals (Sweden)

    Juliana Miranda Filgueiras

    2013-05-01

    Full Text Available This article analyzes the textbooks evaluations, performed during the 1940’s, and the relationship with the school knowledge conformation. The schoolbook policy was promulgated by Law n. 1.006/38, which created the National Textbook Commission (CNLD, responsible for examining and authorizing the textbooks to be adopted across the country. We tried to discuss the Commission constitution, understand who its members were and the work those people developed, focusing on the study of the textbooks evaluations. The analysis highlighted the conflicts between the people involved in those evaluations, who were trying to update the contents and teaching methods in accordance with the official programs and scientific research areas, as well as seeking an official spelling conform for the whole country.

  13. Research overview 1992

    International Nuclear Information System (INIS)

    1993-11-01

    The accelerator and fusion research division is not only the largest scientific division at LBL, but also one of the most diverse. Major efforts in this report are discussed. Investigations in both magnetic and inertial fusion energy; Design, construction, and commissioning of the Advanced Light Source, a state-of-the-art synchrotron-radiation facility; Theoretical and applied studies of accelerator physics; Research and development in superconducting magnets for accelerators and other scientific and industrial applications; and Operation of a heavy-ion accelerator complex, the Bevalac, for nuclear science and biomedical research

  14. Commissioning of the LHC

    CERN Multimedia

    CERN. Geneva

    2007-01-01

    The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.

  15. Report of the State of Nevada Commission on Nuclear Projects

    International Nuclear Information System (INIS)

    1990-12-01

    This third biennial Report of the Nevada Commission on Nuclear Projects has been prepared in fulfillment of the requirements of NRS 459.0092, which stipulates that the Commission shall report to the Governor and Legislature on any matter relating to radioactive waste disposal the Commission deems appropriate and advise and make recommendations on the policy of the State concerning nuclear waste disposal projects. Chapter One of the Report presents a brief overview of the Commission's functions and statutory charges. It also contains a summary of developments which have affected the overall nuclear waste disposl issue since the last Commission Report was published in November, 1988. Chapter Two contains a synthesis of Commission activities and reports on the findings of the Commission relative to the geotechnical, environmental, socioeconomic, transportation, intergovernmental and legal aspects of federal and State nuclear waste program efforts

  16. Uranium recovery research sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory. Annual progress report, May 1982-May 1983

    International Nuclear Information System (INIS)

    Foley, M.G.; Opitz, B.E.; Deutsch, W.J.

    1983-06-01

    Pacific Northwest Laboratory (PNL) is currently conducting research for the US Nuclear Regulatory Commission (NRC) on uranium recovery process wastes for both active and inactive operations. NRC-sponsored uranium recovery research at PNL is focused on NRC regulatory responsibilities for uranium-recovery operations: license active milling and in situ extraction operations; concur on the acceptability of DOE remedial-action plans for inactive sites; and license DOE to maintain inactive sites following remedial actions. PNL's program consists of four coordinated projects comprised of a program management task and nine research tasks that address the critical technical and safety issues for uranium recovery. Specifically, the projects endeavor to find and evaluate methods to: prevent erosion of tailings piles and prevent radon release from tailings piles; evaluate the effectiveness of interim stabilization techniques to prevent wind erosion and transport of dry tailings from active piles; estimate the dewatering and consolidation behavior of slurried tailings to promote early cover placement; design a cover-protection system to prevent erosion of the cover by expected environmental stresses; reduce seepage into ground water and prevent ground-water degradation; control solution movement and reaction with ground water in in-situ extraction operations; evaluate natural and induced restoration of ground water in in-situ extraction operations; and monitor releases to the environment from uranium recovery facilities

  17. Uranium recovery research sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory. Annual progress report, May 1982-May 1983

    Energy Technology Data Exchange (ETDEWEB)

    Foley, M.G.; Opitz, B.E.; Deutsch, W.J.; Peterson, S.R.; Gee, G.W.; Serne, R.J.; Hartley, J.N.; Thomas, V.W.; Kalkwarf, D.R.; Walters, W.H.

    1983-06-01

    Pacific Northwest Laboratory (PNL) is currently conducting research for the US Nuclear Regulatory Commission (NRC) on uranium recovery process wastes for both active and inactive operations. NRC-sponsored uranium recovery research at PNL is focused on NRC regulatory responsibilities for uranium-recovery operations: license active milling and in situ extraction operations; concur on the acceptability of DOE remedial-action plans for inactive sites; and license DOE to maintain inactive sites following remedial actions. PNL's program consists of four coordinated projects comprised of a program management task and nine research tasks that address the critical technical and safety issues for uranium recovery. Specifically, the projects endeavor to find and evaluate methods to: prevent erosion of tailings piles and prevent radon release from tailings piles; evaluate the effectiveness of interim stabilization techniques to prevent wind erosion and transport of dry tailings from active piles; estimate the dewatering and consolidation behavior of slurried tailings to promote early cover placement; design a cover-protection system to prevent erosion of the cover by expected environmental stresses; reduce seepage into ground water and prevent ground-water degradation; control solution movement and reaction with ground water in in-situ extraction operations; evaluate natural and induced restoration of ground water in in-situ extraction operations; and monitor releases to the environment from uranium recovery facilities.

  18. Commissioning and start-up of RA-8 critical assembly

    International Nuclear Information System (INIS)

    Lorenzo, N. de; Diaz, C.; Facchini, G.; Fernandez, C.; Fittipaldi, A.; Juracich, R.; Levanon, I.; Manceda, J.; Martinez, J.; Mogdan, R.; Perez, J.; Scarnichia, E.; Blaumann, H.; Gennuso, G.; Scotti, G.

    1999-01-01

    The RA-8 critical assembly was designed as one of the experimental facilities for the CAREM Reactor Project. This paper describes the activities developed during the cold and hot commissioning, pointing out the difficulties and the solutions applied (some of them original ones). Moreover, this paper will show the main features of the newest nuclear installation of CNEA making a brief description of its characteristics. Among the special circumstances related to the commissioning that are described in the paper we can mention the following: 1. The facility shares the building with the Thermohydraulic Assay Laboratory (L.E.T.), another experimental facility of CAREM, and thus some shared systems have already been working for many years before this start up. Special procedures for these systems were designed to verify the proper functioning under the new requirements. 2. A new driving mechanism, based in hydraulic cylinders, was used to move the control rods. The criteria for acceptance and a validation of the procedure completeness have been carried out. 3. The implementation of a power measurement system based in neutron noise. 4. Measurement of Power Distribution using direct gamma counting from the fuel elements. 5. The commissioning was interrupted for a ten-month period because the personnel involved had to carry out the commissioning of the Egyptian Research Reactor 2. Also, the common activities during a commissioning are described, pointing out the major steps carried out and the results obtained. The following are examples of these activities: 1. Environmental dose survey (before fuel loading and during other stages). 2. Test of equipment and systems isolated from the rest of the plant. 3. Integrated system test (two or more systems working at the same time). 4. Start-up and power operation simulations before fuel loading. 5. Fuel loading strategy during the approximation to criticality by mass. 6. Modification of systems' components to improve the

  19. 78 FR 78352 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ14-4-000] Orlando Utilities Commission; Notice of Filing Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): Order No. 1000 Further Regional Compliance Filing to be effective...

  20. 75 FR 37789 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2010-06-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ10-2-000] Orlando Utilities Commission; Notice of Filing June 23, 2010. Take notice that on June 11, 2010, the Orlando Utilities Commission filed, pro forma revised tariff sheets for inclusion in its open access transmission...

  1. 76 FR 31307 - Commission of Fine Arts; Notice of Meeting

    Science.gov (United States)

    2011-05-31

    ... COMMISSION OF FINE ARTS Commission of Fine Arts; Notice of Meeting The next meeting of the U.S. Commission of Fine Arts is scheduled for June 16, 2011, at 10 a.m. in the Commission offices at the National Building Museum,Suite 312, Judiciary Square, 401 F Street, NW., Washington, DC, 20001-2728. Items of...

  2. Requirements for BNCT at a nuclear research reactor. Results from a BNCT workshop organized by the European Commission in Prague, November 2005

    International Nuclear Information System (INIS)

    Moss, Ray; Sauerwein, Wolfgang; Wittig, Andrea; Burian, Jiri

    2006-01-01

    As part of the European Commission's Enlargement and Integration Action (E and IA), which is intended to improve exchange and relationship within the extended European Union (EU), a Workshop was organized in Prague in November 2005. The purpose of the workshop was to present and discuss technical and organisational requirements in setting up a BNCT facility at a research reactor. Topics included: treatment of a patient by BNCT; organisational aspects and regulatory affairs; BNCT from the nuclear perspective and BNCT from the clinician's perspective. Presentations were given by BNCT experts in their particular field, whilst eleven different national nuclear research centres from the New Member States and Accession Countries, interested in developing a BNCT programme, presented the status of their preparations. The conclusions of the Workshop were that an early and close collaboration between nuclear and medical groups is the basis for BNCT, that a local effort to build a BNCT facility should be supported by a national research programme including basic and clinical science and that the JRC and its partners are ready to support national initiatives within the EU and candidate countries. (author)

  3. Linac4 chopper line commissioning strategy

    CERN Document Server

    Bellodi, G; Lombardi, A M; Posocco, P A; Sargsyan, E

    2010-01-01

    The report outlines the strategy for beam-based commissioning of the Linac4 3 MeV chopper line as currently scheduled to start in the second half of 2011 in the Test Stand Area. A dedicated temporary diagnostics test bench will complement the measurement devices foreseen for permanent installation in the chopper line. A commissioning procedure is set out as a series of consecutive phases, each one supposed to meet a well- defined milestone in the path to fully characterise the beam-line. Specific set-ups for each stage are defined in terms of beam characteristics, machine settings and diagnostics used. Operational guidelines are given and expected results at the relative points of measurements are shown for simulated scenarios (on the basis of multi-particle tracking studies carried out with the codes PATH and TRACEWin). These are then interpreted in the light of the resolution limits of the available diagnostics instruments to assess the precision reach on individual measurements and the feasibility of techn...

  4. Safety improvement and results of commissioning of Mochovce NPP WWER 440/213

    International Nuclear Information System (INIS)

    Lipar, M.

    1998-01-01

    Mochovce NPP is the last one of this kind and compared to its predecessors, it is characterized by several modifications which contribute to the improvement of the safety level. In addition based on Nuclear Regulatory Authority requirements and based on documents: - IAEA - Safety Issues and their ranking for NPP WWER 440/213, - IAEA - Safety Improvement of Mochovce NPP Project Review Mission, - Riskaudit - Evaluation of the Mochovce NPP Safety Improvements. Additional safety measures have been implemented before commissioning. The consortium EUCOM (FRAMATOME - SIEMENS), SKODA Praha, ENERGOPROJEKT Praha, Russian organizations and VUJE Trnava Nuclear Power Plants research institute were selected for design and implementation of the safety measures. The papers summarized, safety requirements, safety measures implemented, results of commissioning and results of safety analysis report evaluation. (author)

  5. NSLS-II commissioning and operation

    Energy Technology Data Exchange (ETDEWEB)

    Wang, G., E-mail: gwang@bnl.gov; Shaftan, T.; Bassi, G.; Bengtsson, J.; Blednykh, A.; Blum, E.; Cheng, W.; Choi, J.; Davidsaver, M.; Doom, L.; Fliller, R.; Ganetis, G.; Guo, W.; Hidaka, Y.; Kramer, S.; Li, Y.; Podobedov, B.; Qian, K.; Rose, J.; Seletskiy, S. [Brookhaven National Laboratory, Upton, NY 11973 (United States); and others

    2016-07-27

    The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

  6. Agency transformation and state public utility commissions

    International Nuclear Information System (INIS)

    Jones, Douglas N.

    2006-01-01

    The demise of public utility commissions has been periodically predicted (sometimes hoped for). In their long history they have been attacked by critics as ineffective, inefficient, expensive, or unnecessary. Further, the demonstrated survivability of the commission concept has often been uncharitably attributed to powerful political constituencies, self-preservation manoeuvrings by commissioners themselves, and inertia. The implications of this article point another way. Commission regulation of public utilities has survived mainly because of continued need for social oversight of these critical industry sectors and the capacity of PUCs strategically to adapt to fundamental changes in their surroundings. Two transformational upheavals are treated here - a challenge of flexibility and responsiveness by the dramatic run-up in costs and prices in the 1970s and challenge to relevance by the policy shift to greater reliance on market competition in the 1990s - and regulation's successful accommodation to them. Viewed this way commission regulation is more in a position of 'second wind' than 'last breath'. (author)

  7. 76 FR 25685 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-05-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-000] Orlando Utilities Commission; Notice of Filing Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to be effective 4/15/2011. Any person...

  8. 76 FR 35209 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-001] Orlando Utilities Commission; Notice of Filing Take notice that on May 26, 2011, Orlando Utilities Commission submitted its tariff filing per 35.17(b): Amendment to Compliance Filing to be effective 4/15/2011. Any...

  9. 76 FR 49469 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-08-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-15-000] Orlando Utilities Commission; Notice of Filing Take notice that on July 29, 2011, Orlando Utilities Commission (OUC), pursuant to section 205 of the Federal Power Act (FPA) \\1\\ and Part 35 of the Federal Energy Regulatory...

  10. The design, construction, and commissioning of a multi-use cyclotron facility

    International Nuclear Information System (INIS)

    Ho, S.; Hutcheson, M.; Schick-Martin, D.; Dalzell, M.; Alexander, N.

    2015-01-01

    The Sylvia Fedoruk Canadian Centre for Nuclear Innovation in Saskatchewan is in the process of commissioning the Saskatchewan Centre for Cyclotron Sciences that is to be used for both academic research and commercial radiopharmaceutical production. The hybrid nature of this facility comes with unique challenges in satisfying both the rigid demands of pharmaceutical production while providing the necessary flexibility for academic research. In order to meet these competing demands, the Fedoruk Centre has assembled a distinct combination of skill sets and areas of expertise to operate a facility with an interdisciplinary focus. (author)

  11. The LHC from commissioning to operation

    CERN Document Server

    Lamont, M

    2011-01-01

    In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulating 1 fb-1 by the end of the year. The progress from commissioning to operation is described. Emphasis is put on the beam performance, but also on the performance of the different hardware systems. The role of collimation and machine protection is discussed, in view of the very high stored beam and magnet energy.

  12. CRASH - Community Road Accident System Homepage : feasibility study on a European Road Safety Information System, financially supported by the European Commission.

    NARCIS (Netherlands)

    Brouwer, M. Poppe, F. Blokpoel, A. & Kars, V.

    2000-01-01

    This report is the result of a feasibility study, financially supported by the European Commission. The study investigated the possibilities for the development and maintenance of a European Road Safety Information System with relevant and internationally comparable information. Recommendations on

  13. Java Tool Framework for Automation of Hardware Commissioning and Maintenance Procedures

    International Nuclear Information System (INIS)

    Ho, J C; Fisher, J M; Gordon, J B; Lagin, L J; West, S L

    2007-01-01

    The National Ignition Facility (NIF) is a 192-beam laser system designed to study high energy density physics. Each beam line contains a variety of line replaceable units (LRUs) that contain optics, stepping motors, sensors and other devices to control and diagnose the laser. During commissioning and subsequent maintenance of the laser, LRUs undergo a qualification process using the Integrated Computer Control System (ICCS) to verify and calibrate the equipment. The commissioning processes are both repetitive and tedious when we use remote manual computer controls, making them ideal candidates for software automation. Maintenance and Commissioning Tool (MCT) software was developed to improve the efficiency of the qualification process. The tools are implemented in Java, leveraging ICCS services and CORBA to communicate with the control devices. The framework provides easy-to-use mechanisms for handling configuration data, task execution, task progress reporting, and generation of commissioning test reports. The tool framework design and application examples will be discussed

  14. Commissioning and Performance of the LHCb Silicon Tracker

    CERN Multimedia

    van Tilburg, J; Buechler, A; Bursche , A; Chiapolini, N; Elsaesser, C; Hangartner, V; Salzmann, C; Steiner, S; Steinkamp, O; Staumann, U; Tobin, M; Vollhardt, A; Bay, A; Bettler, M O; Blanc, F; Bressieux, J; Conti, G; Fave, V; Frei, R; Gauvin, N; Gonzalez, R; Haefeli, G; Hicheur, A; Keune, A; Luisier, J; Muresan, R; Nakada, T; Needham, M; Nicolas, L; Knecht, M; Perrin, A; Potterat, C; Schneider, O; Tran, M; Aquines Gutierrez, O; Bauer, C; Britsch, M; Hofmann, W; Maciuc, F; Schmelling, M; Voss, H; Adeva, B; Esperante, D; Fungueiriño Pazos, J; Gallas, A; Pazos-Alvarez, A; Pérez-Trigo, E; Pló Casasús, M; Rogríguez Pérez, P; Saborido, J; Vázquez, P; Iakovenko, V; Okhrimenko, O; Pugatch, V

    2010-01-01

    The LHCb Silicon Tracker is a silicon micro-strip detector with a sensitive area of 12 m$^2$ and a total of 272k readout channels. The Silicon Tracker consists of two parts that use different detector modules. The detector installation was completed by early summer 2008 and the commissioning without beam has reached its finals stage, successfully overcoming most of the encountered problems. Currently, the detector has more than 99% of the channels fully functioning. Commissioning with particles has started using beam-induced events from the LHC injection tests in 2008 and 2009. These events allowed initial studies of the detector performance. Especially, the detector modules could be aligned with an accuracy of about 20 $\\mu$m. Furthermore, with the first beam collisions that took place end of 2009 we could further study the performance and improve the alignment of the detector.

  15. Impact assessment and policy learning in the European Commission

    International Nuclear Information System (INIS)

    Ruddy, Thomas F.; Hilty, Lorenz M.

    2008-01-01

    Governance for sustainable development requires policy coherence and Environmental Policy Integration, which are being hindered by difficulties coordinating the two separate impact assessment processes being conducted in the European Commission. One of them, the Commission-wide Impact Assessment process, looks primarily at EU-internal impacts, whereas the other one, Sustainability Impact Assessment (SIA) in DG Trade, looks outward to other countries and intergovernmental organizations. Ideally, the two processes should complement one another, especially as the two are set to continue being done in parallel. The paper uses a case study of the reform of the European sugar regime under a World Trade Organization ruling to demonstrate how the two impact assessment processes could better complement one another. Feedback from the experience had with existing trade agreements could then promote policy learning and inform the negotiations on new agreements. The number of new bilateral and Regional Trade Agreements is expected to continue rising, thus increasing the importance of the Commission-wide Impact Assessment process required for them

  16. PLEIADES-HR IMAGE QUALITY COMMISSIONING

    Directory of Open Access Journals (Sweden)

    L. Lebègue

    2012-07-01

    Full Text Available PLEIADES is the highest resolution civilian earth observing system ever developed in Europe. This imagery program is conducted by the French National Space Agency, CNES. It operates since 2012 a first satellite PLEIADES-HR launched on 2011 December 17th, a second one should be launched by the end of the year. Each satellite is designed to provide optical 70 cm resolution coloured images to civilian and defence users. The Image Quality requirements were defined from users studies from the different spatial imaging applications, taking into account the trade-off between on-board technological complexity and ground processing capacity. The assessment of the image quality and the calibration operation have been performed by CNES Image Quality team during the 6 month commissioning phase that followed the satellite launch. These activities cover many topics gathered in two families : radiometric and geometric image quality. The new capabilities offered by PLEIADES-HR agility allowed to imagine new methods of image calibration and performance assessment. Starting from an overview of the satellite characteristics, this paper presents all the calibration operations that were conducted during the commissioning phase and also gives the main results for every image quality performance.

  17. VINCI: the VLT Interferometer commissioning instrument

    Science.gov (United States)

    Kervella, Pierre; Coudé du Foresto, Vincent; Glindemann, Andreas; Hofmann, Reiner

    2000-07-01

    The Very Large Telescope Interferometer (VLTI) is a complex system, made of a large number of separated elements. To prepare an early successful operation, it will require a period of extensive testing and verification to ensure that the many devices involved work properly together, and can produce meaningful data. This paper describes the concept chosen for the VLTI commissioning instrument, LEONARDO da VINCI, and details its functionalities. It is a fiber based two-way beam combiner, associated with an artificial star and an alignment verification unit. The technical commissioning of the VLTI is foreseen as a stepwise process: fringes will first be obtained with the commissioning instrument in an autonomous mode (no other parts of the VLTI involved); then the VLTI telescopes and optical trains will be tested in autocollimation; finally fringes will be observed on the sky.

  18. Overview of the Nuclear Regulatory Commission's safety research program

    International Nuclear Information System (INIS)

    Beckjord, E.S.

    1989-01-01

    Accomplishments during 1988 of the Office of Nuclear Regulatory Research and the program of safety research are highlighted, and plans, expections, and needs of the next year and beyond are discussed. Topics discussed include: ECCS Appendix K Revision; pressurized thermal shock; NUREG-1150, or the PRA method performance document; resolution of station blackout; severe accident integration plan; nuclear safety research review committee; and program management

  19. Daily life support for older adults evaluated by commissioned welfare volunteers

    OpenAIRE

    Onishi, Joji

    2016-01-01

    Japan has a unique system of commissioned welfare volunteers who are familiar with neighborhoods and can identify the households requiring assistance and connect them to public support. In the present study, an anonymous self-rated questionnaire was delivered to commissioned welfare volunteers to clarify the daily life supports provided for elderly households requiring assistance, and 2270 data were collected. The questionnaires included information about elderly households requiring assistan...

  20. Commission administration. National Low-Level Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1984-09-01

    This report is one in a series of commission option documents prepared for the US Department of Energy, designed to assist regional low-level waste compact commissions in their organization, administration and efforts to effectively manage waste within their regions. In particular, this report addresses topics related to commission administrative procedures, personnel, procurement and finance

  1. Australian Atomic Energy Commission: A case study in Australian science and government

    Energy Technology Data Exchange (ETDEWEB)

    Moyal, A M [New South Wales Inst. of Tech., Broadway (Australia)

    1975-09-01

    No major scientific body in Australia has evoked as much questioning, criticism and speculation as the Australian Atomic Energy Commission, which was established in 1953 and which, 21 years later, still stands poised on the threshold of bringing Australia into the nuclear age. It is argued that the AAEC has not consolidated the goals and purposes which were set for it over two decades ago. This study attempts to answer the following questions: 1) Is the AAEC a viable institution or is it a white elephant; 2) Has it a rationale and a future in the present age; 3) Has it been accountable or has it evolved, expanded, reorganised, changed direction, consumed funds, used and produced talent, and ultimately marked time behind closed political and administrative doors; 4) Why have its work, its accomplishments and failures not been subjected to public scrutiny.

  2. Overview of the Beam diagnostics in the Medaustron Accelerator:Design choices and test Beam commissioning

    CERN Document Server

    Osmic, F; Gyorgy, A; Kerschbaum, A; Repovz, M; Schwarz, S; Neustadt, W; Burtin, G

    2012-01-01

    The MedAustron centre is a synchrotron based accelerator complex for cancer treatment and clinical and non-clinical research with protons and light ions, currently under construction in Wiener Neustadt, Austria. The accelerator complex is based on the CERN-PIMMS study [1] and its technical implementation by the Italian CNAO foundation in Pavia [2]. The MedAustron beam diagnostics system is based on sixteen different monitor types (153 devices in total) and will allow measuring all relevant beam parameters from the source to the irradiation rooms. The monitors will have to cope with large intensities and energy ranges. Currently, one ion source, the low energy beam transfer line and the RFQ are being commissioned in the Injector Test Stand (ITS) at CERN. This paper gives an overview of all beam monitors foreseen for the MedAustron accelerator, elaborates some of the design choices and reports the first beam commissioning results from the ITS.

  3. Development and Commissioning of a Small/Mid-Size Wind Turbine Test Facility: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Valyou, D.; Arsenault, T.; Janoyan, K.; Marzocca, P.; Post, N.; Grappasonni, G.; Arras, M.; Coppotelli, G.; Cardenas, D.; Elizalde, H.; Probst, O.

    2015-01-01

    This paper describes the development and commissioning tests of the new Clarkson University/Center for Evaluation of Clean Energy Technology Blade Test Facility. The facility is a result of the collaboration between the New York State Energy Research and Development Authority and Intertek, and is supported by national and international partners. This paper discusses important aspects associated with blade testing and includes results associated with modal, static, and fatigue testing performed on the Sandia National Laboratories' Blade Systems Design Studies blade. An overview of the test capabilities of the Blade Test Facility are also provided.

  4. The financial incentives of European Commission to renewable energies

    International Nuclear Information System (INIS)

    Thomas, A.

    2000-01-01

    The European Commission has an active policy of favoring renewable energies but despite that, only one European program (ALTENER program) is completely dedicated to that topic, in fact various other programs allows the financing of projects concerning renewable energies. This article reviews various current programs that can offer such opportunities. ALTENER-1 was launched in 1993 and ALTENER-2 took over in 1998. ALTENER-2 is funded with 74 millions Euros for 5 years and can finance studies, pilot installations, information and training actions. 2 other programs ETAP and SYNERGY are also concerned by renewable or alternative energies. The fifth PCRD (research and development framing plan) is dedicated to problems of society and then can concern energy. PCRD is made up of 3 major programs (1-the international role of European research, 2-human potential and socio-economic research, 3-innovation and small and medium-scale enterprises) and 4 theme programs (1-energy, environment and durable development, 2-quality of life and management of life resources, 3-friendly information technologies and 4-growth and competitiveness. Each one of these 7 programs can finance actions concerning renewable energies but the first of the theme program is the best opportunity, it is funded with 2 milliards Euros for 5 years. (A.C.)

  5. United States Nuclear Regulatory Commission staff practice and procedure digest

    International Nuclear Information System (INIS)

    1991-02-01

    This Revision 9 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1990 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 9 replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through September 30, 1990. This edition of the Digest was prepared by attorneys from Aspen Systems Corporation pursuant to Contract number 18-89-346. Persons using this Digest are placed on notice that it may not be used as an authoritative citation in support of any position before the Commission or any of its adjudicatory tribunals. Persons using this Digest are also placed on notice that it is intended for use only as an initial research tool, that it may, and likely does, contain errors, including errors in analysis and interpretation of decisions, and that the user should not rely on the Digest analyses and interpretations but must read, analyze and rely on the user's own analysis of the actual Commission, Appeal Board and Licensing Board decisions cited. Further, neither the United States, the Nuclear Regulatory Commission, Aspen Systems Corporation, nor any of their employees makes any expressed or implied warranty or assumes liability or responsibility for the accuracy, completeness or usefulness of any material presented in the Digest. The Digest is roughly structured in accordance with the chronological sequence of the nuclear facility licensing process as set forth in Appendix A to 10 CFR Part 2. Those decisions which did not fit into that structure are dealt with in a section on general matters. Where appropriate, particular decisions are indexed under more than one heading. (JF)

  6. 77 FR 67637 - Equity and Excellence Commission

    Science.gov (United States)

    2012-11-13

    ... notice also describes the functions of the Commission. Notice of this meeting is required by section 10(a.... ADDRESSES: The Commission will meet in Washington, DC at the National Museum of the American Indian at... Lounge of the museum on November 27 and in the museum's fourth-floor conference room on November 28. FOR...

  7. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Sixth Semiannual Report of the Commission to the Congress: Atomic Energy and the Life Sciences, July 1949

    Energy Technology Data Exchange (ETDEWEB)

    Lilienthal, David E.; Bacher, Robert F.; Pike, Sumner T.; Strauss, Lewis L.

    1949-07-01

    The document represents the sixth semiannual Atomic Energy Commission (AEC) report to Congress. The report sums up briefly the major developments in the national atomic energy program and further gives a comprehensive review of one of its major phases -- the biological and medical activities. It outlines the AEC program in all phases of medicine and biology, reviews research results and projects under way, reports what is known of the effects of radiation on man and other living things, and surveys the benefits which may be derived from the use of radiation for diagnosis and treatment of disease and for the study of plants and animals. Since radiation from atomic sources also is potentially harmful to all living things, the Commission has set up safeguards for all who might, without such protection, be exposed to harmful radiation.

  10. 17 CFR 146.9 - Appeals to the Commission.

    Science.gov (United States)

    2010-04-01

    ... Commission or any Commission employee has failed or refused to comply with provisions of the Privacy Act or... disagreement has been filed shall clearly note the portion which is disputed, and include a copy of the...

  11. Lattice Commissioning Strategy Simulation for the B Factory

    International Nuclear Information System (INIS)

    Lee, M.; Whittum, D.; Yan, Y.; Cai, Y.; Shoaee, H.

    2011-01-01

    To prepare for the PEP-II turn on, we have studied one commissioning strategy with simulated lattice errors. Features such as difference and absolute orbit analysis and correction are discussed. To prepare for the commissioning of the PEP-II injection line and high energy ring (HER), we have developed a system for on-line orbit analysis by merging two existing codes: LEGO and RESOLVE. With the LEGO-RESOLVE system, we can study the problem of finding quadrupole alignment and beam position (BPM) offset errors with simulated data. We have increased the speed and versatility of the orbit analysis process by using a command file written in a script language designed specifically for RESOLVE. In addition, we have interfaced the LEGO-RESOLVE system to the control system of the B-Factory. In this paper, we describe online analysis features of the LEGO-RESOLVE system and present examples of practical applications.

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  14. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission Issuance

    International Nuclear Information System (INIS)

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-11-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1992-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. 77 FR 31378 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-05-25

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust... Office of the Secretary is announcing that the Secretarial Commission on Indian Trust Administration and Reform (the Commission) will hold a public meeting on June 11 and 12, 2012. The Commission has gathered...

  4. Commissioning and operation of DRAGON

    International Nuclear Information System (INIS)

    Engel, Sabine

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the 21 Na(p,γ) 22 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of ±20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented

  5. The preparation and implementation of the commissioning of Qinshan nuclear power plant

    International Nuclear Information System (INIS)

    Huang Jinyuan

    1993-05-01

    The commissioning test of Qinshan Nuclear Power Plant is summarized. The preparation stage includes the organizations, commissioning programme, network planning, commissioning items, management procedures, responsibilities and interfaces between divisions, products ordering and supplying, personal training, quality assurance and the review and supervision by National Nuclear Safety Administration etc. The implementation stage includes the commissioning programme planning, intermediate hand-over inspection of the system and equipment, inspecting conditions and setting organizations for commissioning, the transition from commissioning to operating. Finally, some experiences in the commissioning test are presented in the article

  6. Commissioning of the ALICE-LHC online data quality monitoring framework

    International Nuclear Information System (INIS)

    Roukoutakis, Filimon; Haller, Barthelemy von

    2009-01-01

    ALICE is one of the experiments installed at CERN Large Hadron Collider, dedicated to the study of heavy-ion collisions. The final ALICE data acquisition system has been installed and is being used for the testing and commissioning of detectors. Data Quality Monitoring (DQM) is an important aspect of the online procedures for a HEP experiment. In this presentation we overview the commissioning and the integration of ALICE's AMORE (Automatic MOnitoRing Environment), a custom-written distributed application aimed at providing DQM services in a large, experiment-wide scale.

  7. Cancer risks near nuclear facilities: the importance of research design and explicit study hypotheses.

    Science.gov (United States)

    Wing, Steve; Richardson, David B; Hoffmann, Wolfgang

    2011-04-01

    In April 2010, the U.S. Nuclear Regulatory Commission asked the National Academy of Sciences to update a 1990 study of cancer risks near nuclear facilities. Prior research on this topic has suffered from problems in hypothesis formulation and research design. We review epidemiologic principles used in studies of generic exposure-response associations and in studies of specific sources of exposure. We then describe logical problems with assumptions, formation of testable hypotheses, and interpretation of evidence in previous research on cancer risks near nuclear facilities. Advancement of knowledge about cancer risks near nuclear facilities depends on testing specific hypotheses grounded in physical and biological mechanisms of exposure and susceptibility while considering sample size and ability to adequately quantify exposure, ascertain cancer cases, and evaluate plausible confounders. Next steps in advancing knowledge about cancer risks near nuclear facilities require studies of childhood cancer incidence, focus on in utero and early childhood exposures, use of specific geographic information, and consideration of pathways for transport and uptake of radionuclides. Studies of cancer mortality among adults, cancers with long latencies, large geographic zones, and populations that reside at large distances from nuclear facilities are better suited for public relations than for scientific purposes.

  8. US Nuclear Regulatory Commission, 1984 annual report. Volume 1

    International Nuclear Information System (INIS)

    1985-01-01

    This is the 10th annual report of the US Nuclear Regulatory Commission (NRC). This report covers the major activities, events, decisions and planning that took place during fiscal year 1984 (October 1983 through September 1984) within the NRC or involving the NRC. Information is presented concerning 1984 highlights and planning for 1985; reactor regulation; cleanup at Three Mile Island Unit 2; operational experience; nuclear materials; safeguards; waste management; inspection, enforcement, quality assurance, and emergency preparedness; cooperation with the States; international programs; nuclear regulatory research; proceedings and litigation; and management and communication

  9. The European Commission's light bulb decree: Another costly regulation?

    Energy Technology Data Exchange (ETDEWEB)

    Frondel, Manuel, E-mail: frondel@rwi-essen.de [Ruhr-University Bochum (RUB), Ruhr-Graduate School in Economics (RGS Econ) (Germany); Rheinisch-Westfaelisches Institut fuer Wirtschaftsforschung (RWI), Hohenzollernstr. 1-3, 45128 Essen (Germany); Lohmann, Steffen [Rheinisch-Westfaelisches Institut fuer Wirtschaftsforschung (RWI), Hohenzollernstr. 1-3, 45128 Essen (Germany); Tinbergen Institute (Netherlands)

    2011-06-15

    Since September 2009, Regulation 244/2009 of the European Commission enforces the gradual phase-out of incandescent light bulbs. As of September 2012, only energy-efficient lighting sources will be allowed for sale. Among these are halogen light bulbs, light-emitting diodes (LED), or compact fluorescent light bulbs-often referred to as energy-saving light bulbs. The Commission's justification for the phase-out of conventional light bulbs maintains that a reduction in the electricity consumed will not only lead to lower energy cost for private households and industrial consumers, but at the same time lead to a decrease in greenhouse gas emissions. This article discusses possible reasons for the slow market diffusion of energy-saving light bulbs and shows that the investment in energy-efficient light bulbs does not necessarily lead to significant cost reductions. Drawing on some illustrative examples, we demonstrate that the use of cheaper incandescent bulbs instead of energy-saving light bulbs can be economically rational in cases of rather low usage times, in which the higher initial purchasing price might only pay off after very long time spans. Furthermore, due to the coexistence with the European Emissions Trading Scheme (ETS), this regulation attains no additional emission reductions beyond those achieved by the ETS alone. We thus conclude that the general ban of incandescent light bulbs is inappropriate and should be abolished by the Commission. - Research Highlights: > This article discusses reasons for the slow market diffusion of energy-saving light bulbs. > We show that using incandescent bulbs can be rational in cases of rather low usage times. > We conclude that the general ban of incandescent light bulbs should be abolished by the Commission.

  10. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  11. Law of the Energy Regulatory Commission

    International Nuclear Information System (INIS)

    1995-01-01

    This Decree-Law consist of three chapters each on divided in articles and subsections and came into force in November 1 st., 1995. Chapter I, with the heading 'Nature and Powers', defines the Energy Regulatory Commission as a decentralized organ of the Energy Secretariat with technical and operative autonomy in terms of the law, and establish the conditions for the sell, generation, exportation and importation of electricity with destination to particular and public services. The sell transport, storage and distribution of natural gas, as well as the gas liquefied from petroleum are also considered. Chapter II with the heading 'Organization and duties' establish that the Commission is integrated by five Committee, the President included. The Committee members will deliberate in collegiate manner and the decisions are by majority, having the President a vote of quality. Chapter III for 'General provisions' is related to the lawsuits arises between the Commission and the users of services. (Author)

  12. Commissioning of Nuclear Power Plants. The AREVA approach

    International Nuclear Information System (INIS)

    Mateo, G.

    2014-01-01

    Georges Mateo, Fellow Expert at AREVA, closed the last day of conferences by detailing deeply the different phases of NPPs commissioning. He insisted on the skills required to be a Commissioning engineer and on the carrier opportunities that it offers

  13. A Longitudinal Study of Illinois State Scholarship Commission Monetary Award Recipients, 1967-1974.

    Science.gov (United States)

    Boyd, Joseph D.; Fenske, Robert H.

    The present effectiveness and future direction of monetary award programs administered by the Illinois State Scholarship Commission is examined in three surveys. A random sample of 1,000 was drawn from the total number of scholarship recipients during the 1967-68 and 1970-71 academic years; 2,000 from the 1973-74 survey. It is shown that: (1)…

  14. 16 CFR 1020.1 - Why is the Commission issuing this rule?

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Why is the Commission issuing this rule... § 1020.1 Why is the Commission issuing this rule? (a) To state the Commission's policies on small... small businesses do not bear a disproportionate share of any burden or cost created by a Commission...

  15. 76 FR 4369 - Special Law Enforcement Commissions

    Science.gov (United States)

    2011-01-25

    ...This notice announces the online publication of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the Office of Justice Services following passage of the Tribal Law and Order Act of 2010. The documents are published on the Indian Affairs Web site.

  16. Commissioning of the Ground Test Accelerator RFQ

    International Nuclear Information System (INIS)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H - injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2βγ Drift Tube Linac (DTL-1) module, the 8.7 MeV 2βγ DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations

  17. Commissioning of the ground test accelerator RFQ

    International Nuclear Information System (INIS)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Garnott, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohsen, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Sandoval, D.P.; Saadatmand, K.; Stevens, R.R.Jr.; Vaughn, G.; Wadlinger, E.A.; Yuan, V.; Connolly, R.; Weiss, R.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on line. The commissioning stages are the 35-keV H - injector, the 2.5-MeV radio-frequency quadrupole (RFQ), the intertank matching section (IMS), the 3.2-MeV first 2-βλ drift tube linac (DTL-1) module, the 8.7-MeV 2-βλDTL (modules 1-5), and the 24-MeV GTA (all 10 DTL modules). Commissioning results from the RFQ beam experiments are presented along with comparisons with simulations. (Author) 8 refs., 9 figs

  18. Oklahoma Study of Educator Supply and Demand: Trends and Projections

    Science.gov (United States)

    Berg-Jacobson, Alex; Levin, Jesse

    2015-01-01

    In June 2014, the Oklahoma State Regents of Higher Education (OSRHE) commissioned American Institutes for Research (AIR) to conduct a study to better understand both historical and future predicted trends of educator supply and demand across Oklahoma. OSRHE commissioned the study in partnership with the Oklahoma Commission for Teacher Preparation…

  19. State Electricity Commission of Victoria. Annual report 1984-1985

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    The State Electricity Commission of Victoria is a body corporate first constituted under the Electricity Commissioner's Act 1918. It now operates under the State Electricity Commission Act 1958. It generates, transmits and distributes electricity throughout Victoria's 228,000 square kilometres and supplies directly to 1.424 million customers. In addition 277,800 customers are supplied by eleven municipal authorities which purchase electricity in bulk from the Commission. The Commission also has a regulatory responsibility to ensure the safe use of electricity. It employs 22,518 people. The installed capacity of generators in the Commission's system, plus Victoria's share of Snowy and Hume generation, totalled 6603 MW at 30 June 1985 and the main transmission system comprises 500 kV, 300 kV and 220 kV lines. Corporate objectives have been developed in seven broad areas: customers,employee, finance, ntural resources, environment, conservationand community. These areas of activity are detailed in this report.

  20. Comparison of Brokerage and Commission in Iranian Commercial Law

    Directory of Open Access Journals (Sweden)

    Manochehr Ghadami

    2017-02-01

    Full Text Available Terms such as commission and brokerage are similar in the concept of agency and in some cases they are different. In the legal system of Iran, commission section is derived from French law and it drives out the commission from the realm of agency and justifies it as an entity equal to the contract of the mandate. On the other hand, the brokerage has not been discussed in Iran’s jurisprudential sources and civil law as a legal body establishment; therefore, we can take it as new found phenomena that came to our legal system simultaneous with the commercial law concepts.  Such differences between commission agent with broker can be stated like this: the commission agent is only obliged to announce the actions and especially do his missions to the commander, in fact the commission agent has the right of disclosure before his commander, but according to the article 337 of the written law, the broker also has the right of disclosure of the details of transaction toward the party with whom the brokerage contract has not been signed. The broker is usually the middleman of the transmission in consideration of receiving a specific amount of money or he can find a party for a person who wants to conduct a transaction and he himself doesn’t get involved in the transaction and is not engaged, whereas the commission agent is directly a contracting party and the true beneficiary (commander which the transaction is done in his account has no contact with the main buyer. This survey is done by the analytical-descriptive method for comparing the brokerage and commission in the commercial law of Iran.

  1. 17 CFR 155.3 - Trading standards for futures commission merchants.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Trading standards for futures commission merchants. 155.3 Section 155.3 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION TRADING STANDARDS § 155.3 Trading standards for futures commission merchants. (a) Each futures...

  2. 76 FR 71449 - Reporting Line for the Commission's Ethics Counsel

    Science.gov (United States)

    2011-11-18

    ... Ethics Counsel AGENCY: Securities and Exchange Commission. ACTION: Final rule. SUMMARY: The Securities... of the Ethics Counsel is now a stand-alone Office of the Commission and that the head of the Office, the Ethics Counsel, reports directly to the Chairman of the Commission. DATES: Effective Date...

  3. NSLS-II injector commissioning and initial operation

    Energy Technology Data Exchange (ETDEWEB)

    Bacha, B.; Blum, E.; Bassi, B.; Bengtsson, J.; Blednykh, A.; Buda, S.; Cheng, W.; Choi, J.; Cuppolo, J.; D Alsace, R.; Davidsaver, M.; DeLong, J.; Doom, L.; Durfee, d.; fliller, R.; Fulkerson, M.; Ganetis, G.; Gao, F.; Gardner, C.; Guo, W.; Heese, R.; Hidaka, Y.; Hu, Y.; Johanson, M.; Kosciuk, B.; Kowalski, S.; Dramer, S.; Krinsky, S.; Li, Y.; Louie, W.; Maggipinto, M.; Marino, P.; Mead, J.; Oliva, G.; Padrazo, D.; Pedersen, K.; Podobedov, B.; Rainer, R.; Rose, J.; Santana, M.; Seletskiy, S.; Shaftan, T.; Singh, O.; Singh, P.; Smalyuk, V.; Smith, R.; Summers, T.; Tagger, J.; Tian, Y.; Wahl, W.; Wang, G.; Weiner, G.; Willeke, F.; Yang, L.; Yang, X.; Zeitler, E.; Zitvogel, E.; Zuhoski, P.

    2015-05-03

    The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

  4. Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decision, July 1972 - June 1995

    International Nuclear Information System (INIS)

    1996-04-01

    This is the seventh edition of the Nuclear Regulatory Commission (NRC) Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1995 interpreting the NRC rules of practice in 10 CFR part 2

  5. PROMOTER COMMISSION LEGISLATIVE AND EXTERNAL REPRESENTATIVE OF THE UNION

    Directory of Open Access Journals (Sweden)

    Nely Militaru

    2014-11-01

    Full Text Available Commission was established by the Treaty establishing the Economic Community of Coal and Osel – signed in Paris in 1951, entered into force next year –as the High Authority supranational institution with discretionary decisionmaking powers in optics of this treaty. Also known as “guardian of the treaties” Commission by its member, who exercise their functions in complete independence, is an institution that promotes the general interest of the Union (art. 17 par.TEU. Commission oversees therefore application of Union law. In this capacity, especially in terms of the competence of the legislative proposal, the Commission by calling upon specialists and experts from EU Member States harmonize with the national interest.

  6. 19 CFR 210.49 - Implementation of Commission action.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Implementation of Commission action. 210.49 Section 210.49 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE ADJUDICATION AND ENFORCEMENT Determinations and Actions Taken § 210.49...

  7. Page THE ROLE OF SECURITIES AND EXCHANGE COMMISSION

    African Journals Online (AJOL)

    Fr. Ikenga

    Exchange Commission requires that important information concerning the issuer and the securities ... role of the Securities and Exchange Commission in regulating investments and securities ... relatively long periods for use by economic units with deficit funds. ..... (including bank account) of any person whose assets were.

  8. 17 CFR 200.80 - Commission records and information.

    Science.gov (United States)

    2010-04-01

    ... intelligence investigation, information furnished by a confidential source; (v) Would disclose techniques or... Commission publishes weekly the SEC Docket, which prints the full text of every Commission release. (iii) The... obtained from the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402. (iv...

  9. [The history of the Kaiser Wilhelm Society during the Third Reich. Interim reports of the president's commission of the Max Planck Society].

    Science.gov (United States)

    Weber, M M

    2002-11-01

    In 1997 the Max Planck Society set up a presidential commission to do research on the historical development of its precursor organization, the Kaiser Wilhelm Society (KWG), during the Third Reich. This paper presents some of the important results given in the interim reports of this commission that are relevant to psychiatry. It focuses on brain research, anthropology, psychiatric genetics, and the role of the well-known biochemist Adolf Butenandt. In general, the interim reports reflect the numerous links between the biomedical research of the KWG and the institutions of the National Socialist (Nazi) state. However, they do not yet allow a final historical assessment as to the complex situation of this field of research during National Socialism.

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  13. 76 FR 24383 - Commission's Rules of Practice, Procedure, and Organization

    Science.gov (United States)

    2011-05-02

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Parts 0 and 1 [GC Docket No. 10-44; FCC 11-16] Commission... docket management measures, such as broadening the use of docketed proceedings; expanding the requirement... effective date for FCC rules in the event the Commission does not specify an effective date in a rulemaking...

  14. Commissioning and operation of DRAGON

    CERN Document Server

    Engel, S

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the sup 2 sup 1 Na(p,gamma) sup 2 sup 2 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of +-20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented.

  15. Nuclear safety research

    International Nuclear Information System (INIS)

    1996-01-01

    The topics 'Large-sized PWR-NPP Safety Techniques Research',and 'The Key Techniques Research on the Safety Supervision and Control for Operation of Nuclear Installations' have been adopted as an apart of 'the National 9th five Year Programs for Tacking the Key Scientific and Technical Topics' which are organized by the State Planning Commission (SPC) and State Science and Technology Commission (SSTC) respectively, and have obtained a financial support from them. To play a better role with the limited fund, the NNSA laid special stress on selecting key sub-topics on nuclear safety, and carefully choosing units which would undertake sub-topics and signing technical contracts with them

  16. Genetic testing in the epilepsies—Report of the ILAE Genetics Commission

    OpenAIRE

    Ottman, Ruth; Hirose, Shinichi; Jain, Satish; Lerche, Holger; Lopes-Cendes, Iscia; Noebels, Jeffrey L.; Serratosa, José; Zara, Federico; Scheffer, Ingrid E.

    2010-01-01

    In this report, the International League Against Epilepsy (ILAE) Genetics Commission discusses essential issues to be considered with regard to clinical genetic testing in the epilepsies. Genetic research on the epilepsies has led to the identification of more than 20 genes with a major effect on susceptibility to idiopathic epilepsies. The most important potential clinical application of these discoveries is genetic testing: the use of genetic information, either to clarify the diagnosis in ...

  17. Meeting of Commission of International Committee on Petrology of Coals

    Energy Technology Data Exchange (ETDEWEB)

    Timofeev, P P; Bogolyubova, L I

    1982-03-01

    In Urbana, Illinois from 18-20 May 1979 the XXXII session of the International Committee on Petrology met. Reports were made on standards for the study of bituminous and anthracite coals. Use of reflective capacity of vitrain to determine coalification of coals was discussed along with a proposition to establish numerical boundaries between brown, bituminous and anthracite coals. The re-editing of the International Dictionary on Petrology of Coals was agreed upon in view of new facts on microcomponents of coal and methods of studying them. The next meeting of the Commission took place at Ostrav, Czechoslovakia from 14-26 April 1980. At the plenary session, new officials were elected and agreement to re-edit the Dictionary on Petrology of Coals was confirmed. At the meeting of the Commission on Coal Petrography the question of the determination of components of coal by quantitative diagnosis, and results of determining components of vitrain by measuring its reflective capacity were reported on. At the meeting of the Committee on Applying Facts of Petrology in Geology, the classification of solid oil bitumen and organic substance of sediments was discussed. At the meeting of the Committee on the Application of the Petrology of Coals in Industry, attention was given to discussing basic parameters for the international classification of coals to be presented at the meeting of the Economic Commission of Europe in Geneva. In the final plenary session of the commission, results of discussions were summarized. The next session was to be held in France in 1981. (In Russian)

  18. 78 FR 4366 - Appeal Proceedings Before the Commission

    Science.gov (United States)

    2013-01-22

    ... significant adverse effect on competition, employment, investment, productivity, innovation, or the ability of... assessment is not required. Civil Justice Reform In accordance with Executive Order 12988, the Commission has...(a) and 3(b)(2) of the Order. National Environmental Policy Act The Commission has determined that...

  19. 16 CFR 5.66 - Commission decision and reconsideration.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Commission decision and reconsideration. 5.66 Section 5.66 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF... (b) references therein to “court of appeals” shall be deemed for purposes of proceedings under this...

  20. Arizona Commission of Indian Affairs 1982 Annual Report.

    Science.gov (United States)

    Arizona Commission of Indian Affairs, Phoenix.

    Designed to provide insight into the proceedings, transactions, and findings of the Arizona Commission of Indian Affairs, this 1981-82 annual report reflects the Commission's efforts to improve communications, understanding and working relationships between tribes and state government to provide tribes with technical assistance. The report…

  1. Views of Swedish Commissioning Parents Relating to the Exploitation Discourse in Using Transnational Surrogacy

    Science.gov (United States)

    Arvidsson, Anna; Johnsdotter, Sara; Essén, Birgitta

    2015-01-01

    Transnational surrogacy, when people travel abroad for reproduction with the help of a surrogate mother, is a heavily debated phenomenon. One of the most salient discourses on surrogacy is the one affirming that Westerners, in their quest for having a child, exploit poor women in countries such as India. As surrogacy within the Swedish health care system is not permitted, Swedish commissioning parents have used transnational surrogacy, and the majority has turned to India. This interview study aimed to explore how commissioning parents negotiate the present discourses on surrogacy. Findings from the study suggest that the commissioning parents’ views on using surrogacy are influenced by competing discourses on surrogacy represented by media and surrogacy agencies. The use of this reproductive method resulted, then, in some ambiguity. Although commissioning parents defy the exploitation discourse by referring to what they have learnt about the surrogate mother’s life situation and by pointing at the significant benefits for her, they still had a request for regulation of surrogacy in Sweden, to better protect all parties involved. This study, then, gives a complex view on surrogacy, where the commissioning parents simultaneously argue against the exploitation discourse but at the same time are uncertain if the surrogate mothers are well protected in the surrogacy arrangements. Their responses to the situation endorse the need for regulation both in Sweden and India. PMID:25955178

  2. Views of Swedish commissioning parents relating to the exploitation discourse in using transnational surrogacy.

    Science.gov (United States)

    Arvidsson, Anna; Johnsdotter, Sara; Essén, Birgitta

    2015-01-01

    Transnational surrogacy, when people travel abroad for reproduction with the help of a surrogate mother, is a heavily debated phenomenon. One of the most salient discourses on surrogacy is the one affirming that Westerners, in their quest for having a child, exploit poor women in countries such as India. As surrogacy within the Swedish health care system is not permitted, Swedish commissioning parents have used transnational surrogacy, and the majority has turned to India. This interview study aimed to explore how commissioning parents negotiate the present discourses on surrogacy. Findings from the study suggest that the commissioning parents' views on using surrogacy are influenced by competing discourses on surrogacy represented by media and surrogacy agencies. The use of this reproductive method resulted, then, in some ambiguity. Although commissioning parents defy the exploitation discourse by referring to what they have learnt about the surrogate mother's life situation and by pointing at the significant benefits for her, they still had a request for regulation of surrogacy in Sweden, to better protect all parties involved. This study, then, gives a complex view on surrogacy, where the commissioning parents simultaneously argue against the exploitation discourse but at the same time are uncertain if the surrogate mothers are well protected in the surrogacy arrangements. Their responses to the situation endorse the need for regulation both in Sweden and India.

  3. Views of Swedish commissioning parents relating to the exploitation discourse in using transnational surrogacy.

    Directory of Open Access Journals (Sweden)

    Anna Arvidsson

    Full Text Available Transnational surrogacy, when people travel abroad for reproduction with the help of a surrogate mother, is a heavily debated phenomenon. One of the most salient discourses on surrogacy is the one affirming that Westerners, in their quest for having a child, exploit poor women in countries such as India. As surrogacy within the Swedish health care system is not permitted, Swedish commissioning parents have used transnational surrogacy, and the majority has turned to India. This interview study aimed to explore how commissioning parents negotiate the present discourses on surrogacy. Findings from the study suggest that the commissioning parents' views on using surrogacy are influenced by competing discourses on surrogacy represented by media and surrogacy agencies. The use of this reproductive method resulted, then, in some ambiguity. Although commissioning parents defy the exploitation discourse by referring to what they have learnt about the surrogate mother's life situation and by pointing at the significant benefits for her, they still had a request for regulation of surrogacy in Sweden, to better protect all parties involved. This study, then, gives a complex view on surrogacy, where the commissioning parents simultaneously argue against the exploitation discourse but at the same time are uncertain if the surrogate mothers are well protected in the surrogacy arrangements. Their responses to the situation endorse the need for regulation both in Sweden and India.

  4. Automatic Analysis at the Commissioning of the LHC Superconducting Electrical Circuits

    CERN Document Server

    Reymond, H; Charrondiere, C; Rijllart, A; Zerlauth, M

    2011-01-01

    Since the beginning of 2010 the LHC has been operating in a routinely manner, starting with a commissioning phase and then an operation for physics phase. The commissioning of the superconducting electrical circuits requires rigorous test procedures before entering into operation. To maximize the beam operation time of the LHC, these tests should be done as fast as procedures allow. A full commissioning need 12000 tests and is required after circuits have been warmed above liquid nitrogen temperature. Below this temperature, after an end of year break of two months, commissioning needs about 6000 tests. As the manual analysis of the tests takes a major part of the commissioning time, we automated existing analysis tools. We present here how these LabVIEW™ applications were automated, the evaluation of the gain in commissioning time and reduction of experts on night shift observed during the LHC hardware commissioning campaign of 2011 compared to 2010. We end with an outlook at what can be further optimized.

  5. Automatic analysis at the commissioning of the LHC superconducting electrical circuits

    International Nuclear Information System (INIS)

    Reymond, H.; Andreassen, O.O.; Charrondiere, C.; Rijllart, A.; Zerlauth, M.

    2012-01-01

    Since the beginning of 2010 the LHC has been operating in a routinely manner, starting with a commissioning phase and then an operation for physics phase. The commissioning of the superconducting electrical circuits requires rigorous test procedures before entering into operation. To maximize the beam operation time of the LHC, these tests should be done as fast as procedures allow. A full commissioning need 12000 tests and is required after circuits have been warmed above liquid nitrogen temperature. Below this temperature, after an end of year break of two months, commissioning needs about 6000 tests. As the manual analysis of the tests takes a major part of the commissioning time, we automated existing analysis tools. We present here how these LabVIEW TM applications were automated, the evaluation of the gain in commissioning time and reduction of experts on night shift observed during the LHC hardware commissioning campaign of 2011 compared to 2010. We end with an outlook at what can be further optimized. (authors)

  6. Commissioning and equity in primary care in Australia: Views from Primary Health Networks.

    Science.gov (United States)

    Henderson, Julie; Javanparast, Sara; MacKean, Tamara; Freeman, Toby; Baum, Fran; Ziersch, Anna

    2018-01-01

    This paper reports findings from 55 stakeholder interviews undertaken in six Primary Health Networks (PHNs) in Australia as part of a study of the impact of population health planning in regional primary health organisations on service access and equity. Primary healthcare planning is currently undertaken by PHNs which were established in 2015 as commissioning organisations. This was a departure from the role of Medicare Locals, the previous regional primary health organisations which frequently provided services. This paper addresses perceptions of 23 senior staff, 11 board members and 21 members of clinical and community advisory councils or health priority groups from six case study PHNs on the impact of commissioning on equity. Participants view the collection of population health data as facilitating service access through redistributing services on the basis of need and through bringing objectivity to decision-making about services. Conversely, participants question the impact of the political and geographical context and population profile on capacity to improve service access and equity through service commissioning. Service delivery was seen as fragmented, the model is at odds with the manner in which Aboriginal Community Controlled Health Organisations (ACCHOs) operate and rural regions lack services to commission. As a consequence, reliance upon commissioning of services may not be appropriate for the Australian primary healthcare context. © 2017 John Wiley & Sons Ltd.

  7. New research possibilities at the Budapest research reactor

    International Nuclear Information System (INIS)

    Hargitai, T.; Vidovszky, I.

    2001-01-01

    The Budapest Research Reactor is the first nuclear facility of Hungary. It was commissioned in 1959, reconstructed and upgraded in 1967 and 1986-92. The main purpose of the reactor is to serve neutron research. The reactor was extended by a liquid hydrogen type cold neutron source in 2000. The research possibilities are much improved by the CNS both in neutron scattering and neutron activation. (author)

  8. 16 CFR 1015.10 - Commission report of actions to Congress.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Commission report of actions to Congress. 1015.10 Section 1015.10 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL PROCEDURES FOR... U.S.C. 552(a) § 1015.10 Commission report of actions to Congress. On or before February 1 of each...

  9. Behind the Scenes of Public Construction Clients – Collecting Data on Commissioning Activities and Organisational Approach

    NARCIS (Netherlands)

    Hermans, M.H.; Eisma, P.R.

    2015-01-01

    The understanding of public commissioning activity is fairly limited, with national and European research primarily focusing on large scale projects, European procurement procedures and new construction. However, most construction activities involve small scale projects and assignments performed by

  10. Nuclear Regulatory Commission issuances, April 1995. Volume 41, Number 4

    International Nuclear Information System (INIS)

    1995-04-01

    This book contains issuances of the Nuclear Regulatory Commission and of the Atomic Safety and Licensing Boards, and an issuance of the Director's decision. The issuances concern a petition filed by Dr. James E Bauer seeking interlocutory Commission review of the Atomic Safety and Licensing Board's order imposing several restrictions on Dr. Bauer; a denial of an Interveners' Petition for Review addressing the application of Babcock and Wilcox for a renewal of its Special Nuclear Materials License; granting a motion for a protective order, by Sequoyah Fuel Corporation and General Atomics, limiting the use of the protected information to those individuals participating in the litigation and for the purposes of the litigation only; granting a Petitioner's petition for leave to intervene and request for a hearing concerning Georgia Institute of Technology (Georgia Tech Research Reactor) renewal of a facility license; and a denial of a petition filed by Mr. Ted Dougherty requesting a shutdown of the San Onofre Nuclear Generating Station based on concerns regarding the vulnerability of the plant to earthquakes and defensibility of the plant to a terrorist threat

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Danials of Petitions for Rulemaking (DPRM)

  18. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1989-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuance received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1986-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1988-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-06-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1990-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety And Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1985-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Studies Performed in Preparation for the Spallation Neutron Source Accumulator Ring Commissioning

    CERN Document Server

    Cousineau, Sarah M; Henderson, Stuart; Holmes, Jeffrey Alan; Plum, Michael

    2005-01-01

    The Spallation Neutron Source accumulator ring will compress 1.5?1014, 1 GeV protons from a 1 ms bunch train to a single 695 ns proton bunch for use in neutron spallation. Due to the high beam power, unprecedented control of beam loss will be required in order to control radiation and allow for hands-on maintenance in most areas of the ring. A number of detailed investigations have been performed to understand the primary sources of beam loss and to predict and mitigate problems associated with radiation hot spots in the ring. The ORBIT particle tracking code is used to perform realistic simulations of the beam accumulation in the ring, including detailed modeling of the injection system, transport through the measured magnet fields including higher order multipoles, and beam loss and collimation. In this paper we present the results of a number of studies performed in preparation for the 2006 commissioning of the accumulator ring.

  19. The New World Information Order. [Commission Document] 31.

    Science.gov (United States)

    Masmoudi, Mustapha

    One of a series prepared for the International Commission for the Study of Communication of Unesco, this report elucidates the principal reasons supporting reform of the international information system. Following an introduction that outlines the role of information in developing countries and explains why the current media are inadequate, the…

  20. State Electricity Commission of Victoria annual report 1983-1984

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    The State Electricity Commission of Victoria (SECV) generates, transmits and distributes electricity throughout Victoria's 228,000 square kilometres and supplies directly to 1.390 million customers. In addition, 278,500 customers are supplied by eleven municipal authorities which purchase electricity in bulk from the Commission. The Commission also has a responsibility to ensure the safe use of electricity. The Commission's mission statement is 'to provide cost effective energy and services and to act at all times in the best interests of the people of Victoria by being a responsible, adaptive, financially sound and efficient public utility'. The mission statement is the foundation for all activities and should provide the Commission with a sense of direction and unity of purpose. Corporate objectives have been developed in the following seven broad areas: customer, employee, finance, natural resources, environment, conservation and community. Each objective has been translated into a series of specific goals, the achievement of which will be monitored. Details relating to these areas of activity are detailed in this report.