WorldWideScience

Sample records for research reactor ra

  1. Research nuclear reactor RA - Annual Report 1989

    International Nuclear Information System (INIS)

    Sotic, O.

    1989-12-01

    Annual report concerning the project 'RA research nuclear reactor' for 1989, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities [sr

  2. RA Research nuclear reactor - Annual report 1987

    International Nuclear Information System (INIS)

    1987-12-01

    Annual report concerning the project 'RA research nuclear reactor' for 1987, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities [sr

  3. RA Research reactor, Annual report 1988

    International Nuclear Information System (INIS)

    Sotic, O.

    1988-12-01

    Annual report concerning the project 'RA research nuclear reactor' for 1989, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities [sr

  4. Research nuclear reactor RA, Annual Report 2001

    International Nuclear Information System (INIS)

    Sotic, O.

    2002-01-01

    During 2001, activities at the RA research nuclear reactor in were performed according to the Contract about financing of the RA reactor for the period January-December 2001, signed by the Ministry of Science, technology and development of the Republic of Serbia. RA reactor was not operated since shutdown in August 1984. Although, the most of the planned reconstruction activities were finished until 1991, the most important, which was concerned with exchange of the reactor instrumentation, financed by the IAEA, was interrupted due to international sanctions imposed on the country. Since 1992, all the renewal and reconstruction activities were ceased. Continuous aging and degradation of the equipment and facilities demand decision making about the future status of the Ra reactor. Until this decision is made it is an obligation to maintain control and maintenance of ventilation system, power supply, internal transportation system, spent fuel storage, hot cells, electronic fuel surveillance system, and part of the stationary dosimetry system. In 2001, apart from the mentioned activities, actions were undertaken related to maintenance of the reactor building and installations. The most important tasks fulfilled were: protection of the roof of the ventilation system building, purchase and installing the fire protection system and twelve new battery cells in the reactor building. There were no actions concerned with improvement of the conditions for intermediate spent fuel storage. With the support of IAEA, actions were initiated for possible transport of the spent fuel tu Russia. At the end of 2001, preparations were started for possible future decommissioning of the RA reactor. After, renewal of the membership of our country in the IAEA, the Government of Yugoslavia has declared its attitude about the intention of RA reactor decommissioning at the General Conference in September 2001 [sr

  5. Research nuclear reactor RA - Annual Report 1994

    International Nuclear Information System (INIS)

    Sotic, O.

    1994-12-01

    Activities related to revitalisation of the RA reactor stared in 1986, were continued in 1991. A number of interventions on the reactor components were finished that are supposed to enable continuous and reliable operation. The last, and at the same time largest action, related to exchange of complete reactor instrumentation is underway, but it is behind the schedule in 1991 because the delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. In 1991 most of the existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Activities related to improvement of Russian project were continued in 1994. Control and maintenance of the reactor components was done regularly and efficiently. Extensive repair of the secondary coolant loop is almost finished and will be completed in the first part of 1995 according to existing legal procedures and IAEA recommendations. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 47 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. Research reactor RA Annual report for year 1991 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection [sr

  6. Research nuclear reactor RA - Annual Report 1991

    International Nuclear Information System (INIS)

    Sotic, O.

    1992-01-01

    Activities related to revitalisation of the RA reactor stared in 1986, were continued in 1991. A number of interventions on the reactor components were finished that are supposed to enable continuous and reliable operation. The last, and at the same time largest action, related to exchange of complete reactor instrumentation is underway, but it is behind the schedule in 1991 because the delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. In 1991 most of the existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Construction of some support elements is almost finished by the local staff. The Institute has undertaken this activity in order to speed up the ending of the project. If all the planned instrumentation would not arrive until the end of March 1992, it would not be possible to start the RA reactor testing operation in the first part of 1993, as previously planned. In 1991, 53 staff members took part in the activities during 1991, which is considered sufficient for maintenance and repair conditions. Research reactor RA Annual report for year 1991 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection [sr

  7. Research nuclear reactor RA - Annual report 1992

    International Nuclear Information System (INIS)

    Sotic, O.

    1992-12-01

    Research reactor RA Annual report for year 1992 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. First part includes 8 annexes describing reactor operation, activities of services for maintenance of reactor components and instrumentation, financial report and staffing. Second annex B is a paper by Z. Vukadin 'Recurrence formulas for evaluating expansion series of depletion functions' published in 'Kerntechnik' 56, (1991) No.6 (INIS record no. 23024136. Second part of the report is devoted to radiation protection issues and contains 4 annexes with data about radiation control of the working environment and reactor environment, description of decontamination activities, collection of radioactive wastes, and meteorology data [sr

  8. RA research reactor - properties and experimental capabilities

    International Nuclear Information System (INIS)

    Milosevic, M.; Martinc, R.

    1978-01-01

    The brief survey of the Reactor RA exploitation experience, as well as the reactor equipment state, after 18 years of operation is presented. The results of efforts spent on reactor characteristics improvement in order to ensure safe and reliable reactor operation for next 15-20 years, are described [sr

  9. RA Research nuclear reactor Part 1, RA Reactor operation and maintenance in 1987

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1987-01-01

    RA research reacto was not operated due to the prohibition issued in 1984 by the Government of Serbia. Three major tasks were finished in order to fulfill the licensing regulations about safety of nuclear facilities which is the condition for obtaining permanent operation licence. These projects involved construction of the emergency cooling system, reconstruction of the existing special ventilation system, and renewal of the system for electric power supply of the reactor systems. Renewal of the RA reactor instrumentation system was initiated. Design project was done by the Russian Atomenergoeksport, and is foreseen to be completed by the end of 1988. The RA reactor safety report was finished in 1987. This annual report includes 8 annexes concerning reactor operation, activities of services and financial issues, and three special annexes: report on testing the emergency cooling system, report on renewal of the RA reactor and design specifications for reactor renewal and reconstruction [sr

  10. RA research nuclear reactor - Annual report 1985; Istrazivacki nuklearni reaktor RA - Izvestaj za 1985. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-12-01

    Research reactor RA Annual report for year 1985 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1985 godinu sastoji se od dva dela: prvi deo obuhvata pogon i odzavanje reaktora RA, a drugi poslove zastite od zracenja na reaktoru RA.

  11. RA Research reactor, Annual report 1986; Istrazivacki nuklearni reaktor RA - Izvestaj za 1986. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1986-12-01

    Research reactor RA Annual report for year 1985 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1986 godinu sastoji se od dva dela: prvi deo obuhvata pogon i odzavanje reaktora RA, a drugi poslove zastite od zracenja na reaktoru RA.

  12. RA research reactor - potentials and prospective

    International Nuclear Information System (INIS)

    Sotic, O.

    1984-01-01

    Since December 1959, the RA reactor was operated successfully, except for a few shorter periods needed for maintenance and a four longer shutdown periods caused by decrease in the heavy water quality. Accordingly, reconstruction of some reactor systems was started at the beginning of this decad, as well as increase of its experimental potential which would enable its efficient reliable operation in the future period. Reconstruction is concerned with emergency core cooling system, special ventilation system, and modernization of the reactor instrumentation. Improvement of the experimental potential is related to modifications of the neutron scattering instruments. Development of methods for isotope production is described as well. Design of the reactor experimental loop with external cooling system will be of significant importance in improvement of reactor potential in the future

  13. RA Research reactor, Annual report 1971

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1971-12-01

    During 1971, the RA Reactor was operated at nominal power of 6.5 MW for 190 days, and 50 days at lower power levels. Total production mounted to 31606 MWh which is 5.3% higher than planned, and the highest annual level since the reactor started operation. Reactor was used for irradiation and experiments according to the demand of 425 users, of which 370 from the Institute and 55 external users. This report contains detailed data about reactor power and experiments performed in 1971. Discrepancies from the action plan, meaning higher production was achieved in June and December due to special demand of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to power cuts during reactor operation. There was no longer interruption caused by failures of the equipment. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. Shorter interruptions resulted from breaking of connectors in the technical water pipe system caused by soil sliding near the pumping station on the Danube. Total personnel exposure dose was lower than during previous years. There was no accident nor any event that could be called accidental. Decontamination od surfaces was less than during previous years. It was concluded that the successful operation in 1971 resulted from efficient work during past years. But, some of the activities were interrupted due to undefined policy concerned with operation of the RA reactor and financial issues. This involves study of the possibility to use highly enriched fuel that would increase the useful neutron flux and the reactor compatibility with similar reactors for the future ten years. Another project that has been interrupted is construction of the emergency core cooling system which is important for the reactor safety. Financial problems have influenced not only the reactor operation but the number of employees, which could cause negative

  14. Calculation of research reactor RA power at uncontrolled reactivity changes

    International Nuclear Information System (INIS)

    Cupac, S.

    1978-01-01

    The safety analysis of research reactor RA involves also the calculation of reactor power at uncontrolled reactivity changes. The corresponding computer code, based on Point Kinetics Model has been made. The short review of method applied for solving kinetic equations is given and several examples illustrating the reactor behaviour at various reactivity changes are presented. The results already obtained are giving rather rough picture of reactor behaviour in considered situations. This is the consequence of using simplified feed back and reactor cooling models, as well as temperature reactivity coefficients, which do not correspond to the actual reactor RA structure (which is now only partly fulfilled with 80% enriched uranium fuel). (author) [sr

  15. RA Research reactor, Annual report 1969

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1969-12-01

    During 1969, the RA Reactor was operated at nominal power of 6.5 MW for 200 days, and 15 days at lower power levels. Total production mounted to 31131 MWh which is 3.77% higher than planned. Reactor was used for irradiation and experiments according to the demand of 463 users from the Institute and 63 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. If there had been no problems with power supply during last three months and Danube low water level in September and October the past year would have been the most successful up to now. The number od scram shutdowns was not higher than during past two years in spite of the difficulties in the last quarter. There were three incidents which caused higher personnel exposure during operation. One, was the destruction of the canner with silver (because the time spent in the core was too long) which caused the surface contamination of the platform, the background radiation was 10 to 100 times higher than regular. The other two cases were caused by failure of the device for handling the fuel slugs in the fuel channels during refuelling. Reactor refuelling was done four times during 1969, and 499 fresh fuel slugs were used. Refuelling applied the approach of 'mixing' the fresh fuel slugs with the 'old' fuel slugs in the fuel channel. Decontamination of surfaces was on the same level as previously in spite of the problems with silver. Since two staff members have left, the present number od employees is now the minimum needed for reactor operation and maintenance. It is stated that the operation of components and equipment is on sufficiently high level after ten years of reactor operation. The action plan for 1970 is made according to the same principles as in previous four years but the planned production is decreased to 25000 MWh, because control of important components is needed after ten

  16. RA Reactor; Reaktor RA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-02-15

    In addition to basic characteristics of the RA reactor, organizational scheme and financial incentives, this document covers describes the state of the reactor components after 18 years of operation, problems concerned with obtaining the licence for operation with 80% fuel, problems of spent fuel storage in the storage pool of the reactor building and the need for renewal of reactor equipment, first of all instrumentation. [Serbo-Croat] Pored osnovnih karakeristika reaktora RA, organizacije rada i finansijskih pokazatelja, razmatra se stanje opreme reaktora nakon 18 godina rada, pitanja dozvole za rad sa 80% obogacenim gorivom, problem skladistenja isluzenog goriva u bazenu zgrade reaktora i potreba za obnavljanjem komponenti opreme, pre svega elektronske.

  17. RA Research reactor, Annual report 1988; Istrazivacki nuklearni reaktor RA - Izvestaj za 1988. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1988-12-15

    Annual report concerning the project 'RA research nuclear reactor' for 1989, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1989. godinu, koji finansira republicka zajednica za nauku SR Srbije po ugovoru br. 3705/1 sastoji se iz dva dela. Prvi deo obuhvata pogon i odrzavanje nuklearnog reaktora RA, sto predstavlja obavezu Odeljenja za reaktorski inzenjering u sastavu OOUR Instituta za multidisciplinarna istrazivanja i inzenjering RA. Drugi deo obuhvata poslove zastite od zracenja na reaktoru RA, sto predstavlja obavezu OOUR Instituta za zastitu od zracenja 'Zastita'. Naucno vece Instituta za multidisciplinarna istrazivanja i inzenjering RA ocenilo je da sadrzina ovog izvestaja odgovara izvrsenim poslovima na reaktoru RA u 1989. godini. Pozitivno se ocenjuje obim i kvalitet izvrsenih radova kako u pogledu odrzavanja i rekonstrukcije reaktora, tako i u pogledu poslova zastite od zracenja izvrsenih kod njega.

  18. Research nuclear reactor RA - Annual Report 1989; Istrazivacki nuklearni reaktor RA - Izvestaj za 1989. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1989-12-15

    Annual report concerning the project 'RA research nuclear reactor' for 1989, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1989. godinu, koji finansira republicka zajednica za nauku SR Srbije po ugovoru br. 3705/1 sastoji se iz dva dela. Prvi deo obuhvata pogon i odrzavanje nuklearnog reaktora RA, sto predstavlja obavezu Odeljenja za reaktorski inzenjering u sastavu OOUR Instituta za multidisciplinarna istrazivanja i inzenjering RA. Drugi deo obuhvata poslove zastite od zracenja na reaktoru RA, sto predstavlja obavezu OOUR Instituta za zastitu od zracenja 'Zastita'. Naucno vece Instituta za multidisciplinarna istrazivanja i inzenjering RA ocenilo je da sadrzina ovog izvestaja odgovara izvrsenim poslovima na reaktoru RA u 1989. godini. Pozitivno se ocenjuje obim i kvalitet izvrsenih radova kako u pogledu odrzavanja i rekonstrukcije reaktora, tako i u pogledu poslova zastite od zracenja izvrsenih kod njega.

  19. RA Reactor

    International Nuclear Information System (INIS)

    1978-02-01

    In addition to basic characteristics of the RA reactor, organizational scheme and financial incentives, this document covers describes the state of the reactor components after 18 years of operation, problems concerned with obtaining the licence for operation with 80% fuel, problems of spent fuel storage in the storage pool of the reactor building and the need for renewal of reactor equipment, first of all instrumentation [sr

  20. RA Reactor; Reaktor RA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-07-01

    This chapter includes the following: General description of the RA reactor, organization of work, responsibilities of leadership and operators team, regulations concerning operation and behaviour in the reactor building, regulations for performing experiments, regulations and instructions for inserting samples into experimental channels. [Serbo-Croat] Ovo (prvo) poglavlje sadrzi sledece: Opis reaktora RA; semu organizacije rada i rukovodjenja; prava i duznosti direktora i rukovodioca pogona reaktora, propise o rezimu rada i kretanja u zgradi reaktora, propise o izvodjenju eksperimenata, propise o unosenju uzoraka u eksperimentalne kanale reaktora.

  1. RA Reactor

    International Nuclear Information System (INIS)

    1989-01-01

    This chapter includes the following: General description of the RA reactor, organization of work, responsibilities of leadership and operators team, regulations concerning operation and behaviour in the reactor building, regulations for performing experiments, regulations and instructions for inserting samples into experimental channels [sr

  2. RA Research nuclear reactor, Part II: radiation protection at the RA reactor in 1987

    International Nuclear Information System (INIS)

    Ninkovic, M.; Ajdacic, N.; Zaric, M.; Vukovic, Z.

    1987-01-01

    Radiation protection tasks which enable safe operation of the RA reactor, and are defined according the the legal regulations and IAEA safety recommendations are sorted into four categories in this report: (1) Control of the working environment, dosimetry at the RA reactor and radiation protection; (2) Radioactivity control in the vicinity of the reactor and meteorology measurements; (3) Decontamination and relevant actions, collecting and treatment of fluid effluents; and and solid radioactive wastes [sr

  3. Status of the RA research reactor decommissioning project

    International Nuclear Information System (INIS)

    Ljubenov, V.; Nikolic, D.; Pesic, M.; Milosevic, M.; Kostic, Lj.; Steljic, M.; Sotic, O.; Antic, D. . E-mail address of corresponding author: vladan@vin.bg.ac.yu; Ljubenov, V.)

    2005-01-01

    The 6.5 MW heavy water RA research reactor at the VINCA Institute of Nuclear Sciences operated from 1959 to 1984. After 18 years of extended shutdown in 2002 it was decided that the reactor shutdown should be final. Preliminary decommissioning activities have been initiated by the end of 2002 under the Technical Co-operation Programme of the International Atomic Energy Agency. The objective of the project is to implement safe, timely and cost-effective decommissioning of the RA reactor up to unrestricted use of the site. Decommissioning project is closely related to two other projects: Safe Removal of the RA Reactor Spent Nuclear Fuel and Radioactive Waste Management in VINCA Institute. The main phases of the project include preparation of the detailed decommissioning plan, radiological characterization of the reactor site, dismantling and removal of the reactor components and structures, decontamination, final radiological site survey and the documentation of all the activities in order to obtain the approval for unrestricted use of the facility site. In this paper a review of the activities related to the preparation and realization of the RA reactor decommissioning project is given. Status of the project's organizational and technical aspects as for July 2004 are presented and plans for the forthcoming phases of the project realization are outlined. (author)

  4. RA Research nuclear reactor Part 1, RA Reactor operation and maintenance in 1987; Istrazivacki nuklearni reaktor RA Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1987. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Badrljica, R; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1987-12-15

    RA research reacto was not operated due to the prohibition issued in 1984 by the Government of Serbia. Three major tasks were finished in order to fulfill the licensing regulations about safety of nuclear facilities which is the condition for obtaining permanent operation licence. These projects involved construction of the emergency cooling system, reconstruction of the existing special ventilation system, and renewal of the system for electric power supply of the reactor systems. Renewal of the RA reactor instrumentation system was initiated. Design project was done by the Russian Atomenergoeksport, and is foreseen to be completed by the end of 1988. The RA reactor safety report was finished in 1987. This annual report includes 8 annexes concerning reactor operation, activities of services and financial issues, and three special annexes: report on testing the emergency cooling system, report on renewal of the RA reactor and design specifications for reactor renewal and reconstruction. [Serbo-Croat] Reaktor RA nije radio usled zabrane Izvsnog veca Skupstine Srbije od 27. avgusta 1984. U cilju povecanja pouzdanosti rada reaktora a da bi se udovoljilo zakonskim propisima sto je uslov za dobijanje stalne dozvole za rad realizovana su tri velika zahvata na reaktoru RA. Ovi zahvati obuhvatili su izgradnju sistema za hladjenje jezgra reaktora u slucaju nuzde, rekonstukciju postojeceg sistema specijalne ventilacije i rekonstrukciju sistema napajanja elektricnom energijom neophodnih potrosaca reaktora RA. Zapoceti su radovi na modernizaciji intrumentacije reaktora RA, projekat je izradjen u sovjetskoj organizaciji Atomenergoeksport, a trebalo bi da se realizuje do kraja 1989. godine. U cilju povecanja prostora za skladistenje ozracenog nuklearnog goriva i njegovog efikasnijeg koriscenja, izradjen je su projekti za rekonstrukciju postojecih uredjaja za rukovanje gorivom, povecanje smestajnog kapaciteta i preciscavanje vode u bazenima za odlezavanje. Realizaija ovih

  5. Radiation protection at the RA Reactor in 1993, RA research reactor, Part

    International Nuclear Information System (INIS)

    Ninkovic, M.; Pavlovic, R.; Mandic, M.; Sipka, V.; Grsic, Z.

    1993-01-01

    Radiation protection tasks which enable safe operation of the RA reactor, and are defined according the the legal regulations and IAEA safety recommendations are sorted into four categories in this report: (1) Control of the working environment, dosimetry and radiation protection at the RA reactor; (2) decontamination, collecting and treatment of fluid effluents and solid wastes; (3) Radioactivity control in the vicinity of the reactor and (4)meteorology measurements; (3). Each of the category is described as a separate annex of this report [sr

  6. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1986

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1986-01-01

    In order to enable future reliable operation of the RA reactor, according to new licensing regulations, three major tasks started in 1984 were fulfilled: building of the new emergency system, reconstruction of the existing ventilation system, and reconstruction of the power supply system. Simultaneously in 1985/1986 renewal of the instrumentation and reconstruction of the system for handling and storage of the spent fuel in the reactor building have started. Design projects for these tasks are almost finished and the reconstruction of both systems is expected to be finished until 1988 and mid 1989 respectively. RA reactor Safety report was finished according to the recommendations of the IAEA. Investments in 1986 were used for 8000 kg of heavy water, maintenance of reactor systems and supply of new components, reconstruction of reactor systems. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  7. RA Research reactor, Annual report 1972

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1972-12-01

    During 1972, the total production was 31151 MWh which is 3.8% higher than planned. The reactor was used for irradiation and experiments according to the demand of 381 users, of which 340 from the Institute and 41 external users. This report contains detailed data about reactor power and experiments performed in 1972. Discrepancies from the action plan, meaning higher production was achieved due to special demands of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to announced power cuts. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. There were no longer interruptions. One shorter interruption (shorter than 24 hours) caused by removal of a UO 2 capsule from the core, placed there for measuring heat transfer. Total personnel exposure dose was lower than during previous years. One accident caused contamination with gases and aerosols containing mainly shot-living isotopes. Decontamination od surfaces was less than during previous years. Practically there was no surface contamination that would demand action of the decontamination team, except for the regular decontamination after refueling. It was concluded that the successful operation in 1972 has a special significance having taking in account the financial crisis caused by the unresolved status of the reactor. It is emphasised, in the plan for the next year that there is an urgent need of making a long-term plan of rector application. It is indispensable to finish preparatory tasks for replacing the fuel with the highly enriched fuel elements by 1974, and building the core emergency cooling system [sr

  8. Research nuclear reactor RA - Annual Report 1997; Istrazivacki nuklearni reaktor RA - Izvestaj za 1997. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Vinca Institute of Nuclear Sciences, Beograd (Serbia and Montenegro)

    1997-12-01

    RA reactor is not in operation since 1984, activities related to revitalisation of the RA reactor started in 1986. The planned actions related to renewal of the reactor components were finished except for the most important action, related to exchange of complete reactor instrumentation which was delayed. Only 80% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the sanctions imposed to our country. The existing RA reactor instrumentation was dismantled. Control and maintenance of the reactor components was done regularly and efficiently. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 42 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. The problem of financing the reactor activities and maintenance remains unsolved. Research reactor RA Annual report for year 1997 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] Reaktor RA nije u pogonu od 1984, aktivnosti na revitalizaciji, rekostrukciji i modernizaciji reaktorski sistema zapocete su 1986. godine. Okoncan je niz zahvata na opremi postrojenja kojima ce se u narednom periodu omoguciti kontinualan i pouzdan rad ovog reaktora. Poslednji, i ujedno najveci zahvat, koji se odnosi na zamenu celokupne instrumentacije kasni zbog zastoja u isporuci opreme koja se izradjuje u Sovjetskom savezu. Do septembra 1991. godine isporuceno svega 80% od predvidjene kolicine. Od tada je svaka isporuka obustavljena, a razlog je privremena zabrana na sve isporuke opreme za Jugoslaviju usled sankcija uvedenih od strane organizacije Ujedinjenih nacija. Demontirana je postojeca instrumentacija. Kontrola i odrzavanje celopkupne opreme postrojenja, kao i remontni radovi izvrsavani su redovno i efikasno. Kontrola goriva od strane safeguard inspektora MAAE obavljana

  9. RA research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1985

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1985-01-01

    According to the plan, RA reactor was to be in operation in mid September 1985. But, since the building of the emergency cooling system, nor the reconstruction of the existing special ventilation system were not finished until the end of August reactor was not operated during 1985. During the previous four years reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care, which was cancelled in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981-1984. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks have started: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. IAEA has approved the amount of 1,300,000 US dollars for the renewal of the instrumentation [sr

  10. Research nuclear reactor RA - Annual Report 1975. Operation and maintenance

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    The plan for 1975 was successfully fulfilled. This is reflected in research related to improvement of operating properties of the RA reactor, mostly due to the effort of the RA staff employed in operation and maintenance of the reactor. Fuel saving achieved by this activity amounted to about 38% (80% enriched fuel). Preliminary work is done, concerned with new reactor core with highly enriched fuel. This is a significant saving as well. New fuel elements have arrived at the end of this year. It is going to enable increase of neutron flux by 50% without changing the nominal operating power. The possibility of further improvement of the reactor are analyzed, to enable material testing and production of radioactive sources. Mid term plan for reactor operation was made according to this analysis. It is planned to further increase the neutron flux in isolated smaller zones, and building new experimental loops with cooling and fast neutron converters. Much was done to increase the safety level of reactor operation and preparing the safety report [sr

  11. Research nuclear reactor RA - Annual report 1992; Istrazivacki nuklearni reaktor RA - Izvestaj za 1992. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-12-01

    Research reactor RA Annual report for year 1992 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. First part includes 8 annexes describing reactor operation, activities of services for maintenance of reactor components and instrumentation, financial report and staffing. Second annex B is a paper by Z. Vukadin 'Recurrence formulas for evaluating expansion series of depletion functions' published in 'Kerntechnik' 56, (1991) No.6 (INIS record no. 23024136. Second part of the report is devoted to radiation protection issues and contains 4 annexes with data about radiation control of the working environment and reactor environment, description of decontamination activities, collection of radioactive wastes, and meteorology data. [Serbo-Croat] Godisnji izvestaj o radu nuklearnog reaktora RA za 1992. godinu sastoji se od dva dela: prvi deo obuhvata pogon i odzavanje reaktora RA, a drugi poslove zastite od zracenja na reaktoru RA. Prvi deo sadrzi 8 priloga, koji opisuju rad reaktora i poslove sluzbi za odrzavanje opreme i komponenti, finansijski izvestaj, kadrovsku strukturu osoblja reaktora. Drugi prilog (B) je rad Z. Vukadina 'Recurrence formulas for evaluating expansion series of depletion functions' objavljen u casopisu Kerntechnik, 1991. Drugi deo izvestaja o poslovima zastite od zracenja sadrzi 4 priloga sa podacima radijacione kontrole radne sredine i okoline reaktora, opis poslova dekontaminacije i sakupljanja radioaktivnih materija, kao i meteoroloske podatke.

  12. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1983

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Raickovic, N.; Radivojevic, J.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1983-12-01

    After regular shutdown in November 1982, inspection of the fuel elements from the RA reactor core which was done from December 1982 - February 1983 has shown that there are deposits of aluminium oxides on the surface of the fuel cladding. After restart The RA reactor was operated at power levels from 1.8 - 2 MW, with 80% enriched uranium dioxide fuel elements. It was found that there was no corrosion of the fuel element cladding and that it was not possible to find the cause of surface deposition on the cladding surfaces without further operation. It was decided to purify the heavy water permanently during operation and to increase the heavy water flow by operating two pumps. This procedure was adopted in order to decrease the possibility of corrosion. The Safety committee of the Institute has approved this procedure for operating the RA reactor in 1983. The core was made of 80% enriched fuel, critical experiments were done until June 1983, and after that the operation was continued at power levels up to 2 MW [sr

  13. Research nuclear reactor RA - Annual Report 1991; Istrazivacki nuklearni reaktor RA - Izvestaj za 1991. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-01-01

    Activities related to revitalisation of the RA reactor stared in 1986, were continued in 1991. A number of interventions on the reactor components were finished that are supposed to enable continuous and reliable operation. The last, and at the same time largest action, related to exchange of complete reactor instrumentation is underway, but it is behind the schedule in 1991 because the delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. In 1991 most of the existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Construction of some support elements is almost finished by the local staff. The Institute has undertaken this activity in order to speed up the ending of the project. If all the planned instrumentation would not arrive until the end of March 1992, it would not be possible to start the RA reactor testing operation in the first part of 1993, as previously planned. In 1991, 53 staff members took part in the activities during 1991, which is considered sufficient for maintenance and repair conditions. Research reactor RA Annual report for year 1991 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] U 1991. godini nastavljeni su poslovi na revitalizaciji reaktora RA, zapocetoj 1986. godine. Okoncan je niz zahvata na opremi postrojenja kojima ce se u narednom periodu omoguciti kontinualan i pouzdan rad ovog reaktora. Poslednji, i ujedno najveci

  14. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1984

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1984-12-01

    During the 1984 the reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981. Operation of the primary cooling system was changed in order to avoid appearance of the previously noticed aluminium oxyhydrate on the surface of the fuel element claddings. The new cooling regime enabled more efficient heavy water purification. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks are planned: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. Financing of the planned activities will be partly covered by the IAEA. this Part I of the report includes 8 Annexes describing in detail the reactor operation, and 6 special papers dealing with the problems of reactor operation and utilization

  15. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1988

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1988-01-01

    According to the action plan for 1988, operation of the RA reactor should have been restarted in October, but the operating license was not obtained. Control and maintenance of the reactor components was done regularly and efficiently dependent on the availability of the spare parts. The major difficulty was maintenance of the reactor instrumentation. Period of the reactor shutdown was used for repair of the heavy water pumps in the primary coolant loop. With the aim to ensure future safe and reliable reactor operation, action were started concerning renewal of the reactor instrumentation. Design project was done by the soviet company Atomenergoeksport. The contract for constructing this equipment was signed, and it is planned that the equipment will be delivered by the end of 1990. In order to increase the space for storage of the irradiated fuel elements and its more efficient usage, projects were started concerned with reconstruction of the existing fuel handling equipment, increase of the storage space and purification of the water in the fuel storage pools. These projects are scheduled to be finished in mid 1989. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  16. Research nuclear reactor RA - Annual Report 1996; Istrazivacki nuklearni reaktor RA - Izvestaj za 1996. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1996-12-01

    Activities related to revitalisation of the RA reactor started in 1986, were continued in 1996. All the planned actions related to renewal of the reactor components were finished. The last, and at the same time most important action, related to exchange of complete reactor instrumentation is underway, delayed. The delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 80% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. The existing RA reactor instrumentation was dismantled. Control and maintenance of the reactor components was done regularly and efficiently. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 43 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. The problem of financing the reactor activities and maintenance remains unsolved. Research reactor RA Annual report for year 1996 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] U toku 1996. godine nastavljeni su poslovi na revitalizaciji reaktora RA, zapocetoj 1986. godine. Okoncan je niz zahvata na opremi postrojenja kojima ce se u narednom periodu omoguciti kontinualan i pouzdan rad ovog reaktora. Poslednji, i ujedno najveci zahvat, koji se odnosi na zamenu celokupne instrumentacije kasni zbog zastoja u isporuci opreme koja se izradjuje u Sovjetskom savezu. Izradu ove opreme finansira Medjunarodna agencija za atomsku energiju kroz ugovor sklopljen decembra 1988. godine sa moskovskom firmom Atomenergoexport. Prema tom

  17. RA Research reactor Annual report 1981 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Milosevic, M.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.

    1981-12-01

    The RA nuclear reactor stopped operation after March 1979 campaign due to appearance of aluminium oxyhydrates deposits on the surface of fuel element claddings. Relevant decisions of the Sanitary inspection body of the Ministry of health and the Director General of the 'Boris Kidric' Institute of nuclear sciences, Vinca, banned further reactor operation until reasons caused aluminium oxyhydrates deposition are investigated and removed to enable regular reactor operation. Until the end of 1979 and during 1980, after a series of analyses and findings that caused cease of reactor operation, all the preparatory actions needed for restart were performed. Due to the fact that there is no emergency cooling system and no appropriate filtering system at the reactor, and according to the new regulations about start up of nuclear facilities, the Sanitary inspection body made a decision about temporary licence for reactor start-up meaning performance of the 'zero experiment' limiting the operating power to 1% of the nominal power. Accordingly the reactor was restarted on January 21 1981. Criticality was reached with the core made of 80% enriched fuel elements only. After the experiment was finished by the end of March a permission was demanded for operation at higher power levels at full power. Taking into account the state of the reactor components the operating licence was issued limiting the power to 2 MW until reconstruction of the ventilation system and construction of the emergency cooling system are fulfilled. Program of testing operation started on September 15 1981 increasing gradually the operating power. Thus the reactor was operated at 2 MW power for 15 days during November and December. The total production achieved in 1981 was 1698 MWh. This enabled isotopes production at the reactor during last two months. Control and maintenance of the reactor components and systems was done regularly and efficiently within limits imposed by availability of spare parts. The

  18. Research nuclear reactor RA - Annual Report 1994; Istrazivacki nuklearni reaktor RA - Izvestaj za 1994. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1994-12-01

    Activities related to revitalisation of the RA reactor stared in 1986, were continued in 1991. A number of interventions on the reactor components were finished that are supposed to enable continuous and reliable operation. The last, and at the same time largest action, related to exchange of complete reactor instrumentation is underway, but it is behind the schedule in 1991 because the delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. In 1991 most of the existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Activities related to improvement of Russian project were continued in 1994. Control and maintenance of the reactor components was done regularly and efficiently. Extensive repair of the secondary coolant loop is almost finished and will be completed in the first part of 1995 according to existing legal procedures and IAEA recommendations. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 47 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. Research reactor RA Annual report for year 1991 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] U 1994. godini nastavljeni su poslovi na revitalizaciji reaktora RA, zapocetoj 1986. godine. Okoncan je niz zahvata na opremi postrojenja kojima ce se u narednom periodu omoguciti kontinualan i

  19. Argentina: Disposal aspects of RA-1 research reactor decommissioning waste

    Energy Technology Data Exchange (ETDEWEB)

    Harriague, S; Barberis, C; Cinat, E; Grizutti, C; Scolari, H [Comision Nacional de Energia Atomica, Buenos Aires (Argentina)

    2007-12-15

    The objective of the project is to analyze disposal aspects of waste from total dismantling of Argentinean research reactors, starting with the oldest one, 48 years old RA-1. In order to estimate decommissioning waste, data was collected from files, area monitoring, measurements, sampling to measure activity and composition, operational history and tracing of operational incidents. Measurements were complemented with neutron activation calculations. Decommissioning waste for RA-1 is estimated to be 71.5 metric tons, most of it concrete (57 tons), the rest being steels, lead and reflector graphite (4.8 tons). Due to their low specific activities, no disposal problems are foreseen in the case of metals and concrete. Disposal of aluminium, steel, lead and concrete is analyzed. On the contrary, as the country has no experience in managing graphite radioactive waste, work was concentrated on that material. Stored (Wigner) energy may exist in RA-1 graphite reflectors irradiated at room temperature. Evaluation of stored energy by calorimetric methods is proposed, and its annealing by inductive heating; HEPA filters should be used to deal with gaseous activity emissions, mainly Cl-36 and C-14. Galvanic corrosion, dust explosion, ignition and oxidation can be addressed and should not become disposal problems. Care must be taken with graphite dust generation and disposal, due to wetting and flotation problems. Lessons learned from the project are presented, and the benefits of sharing international experience are stressed. (author)

  20. Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-12-01

    During 1976 the Ra reactor was operating for about 30% shorter period than usual. The reason were extraordinary repair activities within regular and investment maintenance as well as repair of failures caused by neglected maintenance during previous 6 years. Delay was caused by unavailability of fuel (2% enriched fuel elements are spent) and the new 80% enriched fuel demanded experimental and theoretical analyses before being introduced into the core. Safety analyses concerned with using 80% enriched fuel both experimental and theoretical were successfully fulfilled. The December 1976 successful experimental campaign can be marked as end of the 17 years period of using 2% enriched fuel and start of the new period of using highly enriched fuel. This is significant not only for the reactor itself but for the users, because it would result in increase of neutron flux by 50% with the increase of costs by only 4%. Demand was submitted for obtaining the final license for transition operating regime with highly enriched fuel which would save at least 2 200 000 dinars. This will enable reactor operation in 1977 and later on, without interruption by 'critical' and other experiments related to new highly enriched fuel. A high number of repair and other urgent activities were fulfilled in order to enable safe operation. Some of these activities were done never before and some were neglected during past 6 years. The most important tasks were: purchase of Al tubes made of special alloy, fabrication and mounting of the fuel channel; overall investigation of reactor vessel leakage; repair of the heavy water pump; exchange of two vertical channels. basic equipment for construction of emergency cooling system was purchased. Hot cells are equipped for independent utilisation [sr

  1. RA Research nuclear reactor - Annual report 1987; Istrazivacki nuklearni reaktor RA - Izvestaj o radu za 1987. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-12-15

    Annual report concerning the project 'RA research nuclear reactor' for 1987, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1987. godinu, koji finansira republicka zajednica za nauku SR Srbije po ugovoru br. 3509/1 sastoji se iz dva dela. Prvi deo obuhvata pogon i odrzavanje nuklearnog reaktora RA, sto predstavlja obavezu Odeljenja za reaktorski inzenjering u sastavu OOUR Instituta za multidisciplinarna istrazivanja i inzenjering RA. Drugi deo obuhvata poslove zastite od zracenja na reaktoru RA, sto predstavlja obavezu OOUR Instituta za zastitu od zracenja 'Zastita'. Naucno vece Instituta za multidisciplinarna istrazivanja i inzenjjring RA ocenilo je da sadrzina ovog izvestaja odgovara izvrsenim poslovima na reaktoru RA u 1989. godini. Pozitivno se ocenjuje obim i kvalitet izvrsenih radova kako u pogledu odrzavanja i rekonstrukcije reaktora, tako i u pogledu poslova zastite od zracenja izvrsenih kod njega.

  2. Wireless condition monitoring for the RA-6 research reactor

    International Nuclear Information System (INIS)

    Garcia Peyrano, O.; Calzeta, O.; Rico, N.; Damiani, H.; Coutsiers, E.

    1999-01-01

    The vibration laboratory at C.A.B. has a great experience with the analysis and diagnostic of symptoms of failures in the rotating equipment of the R-6 research reactor and in our longest NPP (CANDU 600 Mw), located in Embalse town, Cordoba City, Argentina. Objective: The standard condition monitoring instrumentation system were designed for large equipment operating under different environmental conditions and sensitivities. The signal processing is not flexible and the diagnostic is an expensive method for the small poll type research reactors. This papers describes the research and development which are related whit the new concept, cheaper and flexible condition monitoring instrumentation system. Implementing a vibration analysis measurements technique with a sensor inside (in the pool) of the nuclear reactor RA-6, and mainly based on fft signal processing, an extensive program for vibration source identification was done. Different nuclear power conditions were monitored as full power and in zero power, also. This zero power shows the best acoustical environmental, because the cooling pumps are stop, and the core is cooling by natural convection. Two sensors were mainly used as the detector's subsystem. One of these detectors was an accelerometer attached to the top of the fine control rod and the other one was a water resistant omnidirectional microphone which was located underwater at different distances from the nuclear core. All the signal measurement by this two sensors were recorded and then was processed. Both signal was acquired at the same time for correlation analysis purposes. The analysis was composed by a 'Spectral Dynamics SD380' connected to a P.C. with dedicated post processing software. On the other hand, some calibration and sensitivity comparison was done using an SKFCM40, dual channel data collector and analyzer. (author)

  3. RA research reactor - properties and experimental capabilities; Istrazivacki reaktor RA - Tehnicke karakteristike i eksploatacione mogucnosti

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M; Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1978-05-15

    The brief survey of the Reactor RA exploitation experience, as well as the reactor equipment state, after 18 years of operation is presented. The results of efforts spent on reactor characteristics improvement in order to ensure safe and reliable reactor operation for next 15-20 years, are described. Prikazani su fragmenti iz eksploatacije reaktora kao i stanje opreme, posle 18 godina rada. Na kraju je dat prikaz sta je preduzeto i sta se preduzima da se poboljsaju karakteristike i poveca sigurnost i bezbednost rada za sledecih 15-20 godina.

  4. RA Research reactor Annual report 1982 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.; Miokovic, J.

    1982-12-01

    Reactor test operation started in September 1981 at 2 MW power with 80% enriched fuel continued during 1982 according to the previous plan. The initial reactor core was made of 44 fuel channel each containing 10 fuel slugs. The first half of 1982 was used for the needed measurements and analysis of operating parameters and functioning of reactor systems and equipment under operating conditions. Program concerned with the testing operation at higher power levels was started in the second half of this year. It was found that the inherent excess reactivity and control rod worths ensure safe operation according to the IAEA safety standards. Excess reactivity is high enough to enable higher power level of 4.7 MW during 4 monthly cycles each lasting 15-20 days. Favourable conditions for cooling exist for the initial core configuration. Effects of poisoning at startup on the reactivity and power density distribution were measured as well as initial spatial distribution of the neutron flux which was 3,9 10 13 cm -2 s -1 at 2 MW power. Modification of the calibration coefficient in the system for automated power level control was determined. All the results show that all the safety criteria and limitations concerned with fuel utilization are fulfilled if reactor power would be 4.7 MW. Additional testing operation at 3, 4, and 4.7 MW power levels will be needed after obtaining the licence for operating at nominal power. Transition from the initial core with 44 fuel channels to the equilibrium lattice configuration with 72 fuel channels each containing 10 fuel slugs, would be done gradually. Reactor was not operated in September because of the secondary coolant pipes were exchanged between Danube and the horizontal sedimentary. Control and maintenance of the reactor equipment was done regularly and efficiently dependent on the availability of the spare parts. Difficulties in maintenance of the reactor instrumentation were caused by unavailability of the outdated spare parts

  5. RA research reactor in 'Vinca' Institute-approach to the decommissioning

    International Nuclear Information System (INIS)

    Ljubenov, V.Lj.; Pesic, M.P.; Sotic, O.

    2002-01-01

    In this paper short overview of decommissioning process of research reactors according to IAEA standards and world practice is given. Basic technical characteristics and details of operational history of the RA research reactor in Vinca Institute of Nuclear Sciences are present. The main nuclear and radiation safety problems related to the RA reactor facility are defined and the outlines of the future decommissioning project are proposed. (author)

  6. RA Research reactor, Annual report 1970 - Operation and maintenance

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1970-12-01

    During 1970, the RA Reactor was operated at nominal power of 6.5 MW for 160 days, and 40 days at lower power levels. Total production mounted to 25968 MWh which is 3.87% higher than planned. The action plan was changed compared to the previous years because of sending the heavy water to France for re-concentration. Isotopic concentration of the heavy water was decreased to 99.05% and now after re-concentration it is 99.96%. Discrepancy from the action plan, in September was caused by the delay return of the heavy water for administrative and transportation difficulties. The restart of the reactor in September was postponed because the cladding of one fuel element was damaged immediately after the start-up, and the reactor had to be shutdown. In October and November reactor was in operation 28 and 25 days respectively which enabled to make up for the lost time. Reactor was used for irradiation and experiments according to the demand of 390 users, 340 from the Institute and 50 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. Shorter interruptions were caused only by difficulties with water supply pipes and sliding of the soil. Reactor was only twice scram shutdown because of the false signals caused by failures of the electronic control instrumentation. the period when reactor was not in operation was used for inspection of the reactor vessel internals. By using special TV cameras and telescopes, it was found that the there are no signs of corrosion on the reactor vessel, e.e. that the internals are in a very good state. Simultaneously, connection for the pipes of future emergency core cooling system were constructed. During 1970, the spent fuel was repacked from fuel channels into special aluminium casks. Four casks containing 660 fuel slugs was deposited int the storage pool No.4. There is now 18 casks with 2951 spent fuel slugs in

  7. Project RA Research nuclear reactor - Annual report 1993 with comparative review for the period 1991 - 1993

    International Nuclear Information System (INIS)

    1993-12-01

    Research reactor RA Annual report for year 1993 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. First part includes 8 annexes describing reactor operation, activities of services for maintenance of reactor components and instrumentation, financial report and staffing. The ninth separate annex deals with the feasibility of RA reactor applications. Second part of the report is devoted to radiation protection issues and contains 4 annexes with data about radiation control of the working environment and reactor environment, description of decontamination activities, collection of radioactive wastes, and meteorology data [sr

  8. Research nuclear reactor RA - Annual Report 1995, with comparative review for period 1991-1995

    International Nuclear Information System (INIS)

    Sotic, O.

    1995-12-01

    Activities related to revitalisation of the RA reactor started in 1986, were continued during period 1991-1995. All the planned actions related to renewal of the reactor components were finished. The last, and at the same time most important action, related to exchange of complete reactor instrumentation is underway, delayed. The delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. The existing RA reactor instrumentation was dismantled. Control and maintenance of the reactor components was done regularly and efficiently. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 47 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. The problem of financing the reactor activities and maintenance remains unsolved during the period 1991-1995. This research reactor RA Annual is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection [sr

  9. Decommissioning strategy for the 'RA' research nuclear reactor at the 'Vinca' Institute

    International Nuclear Information System (INIS)

    Matausek, M.V.

    2000-01-01

    Adopting the global strategy for decommissioning of the research reactor RA at the Vinca Institute and preliminary planning of particular activities is necessary independently on the decision of the future status of this reactor, namely even in the case that it is decided to complete the modernization and to use the reactor again. In this paper the global decommissioning strategy for the RA reactor is proposed, as well as the optimal time schedule of particular activities, based on the relevant experiences from other countries (author) [sr

  10. The RA nuclear research reactor at VINCA Institute as an engineering and scientific challenge

    International Nuclear Information System (INIS)

    Mesarovic, M.

    1997-01-01

    The RA nuclear research at the Vinca Institute of Nuclear Sciences is the largest nuclear research facility in Yugoslavia and belongs to that generation of research reactors which have had an important contribution to nuclear technology development. As these older reactors were generally not built to specific nuclear standards, new safety systems had to be installed at the RA reactor for a renewal of its operating licence in 1984 and it was shut down, after 25 years of operation. Although all the required and several additional systems were built for the restart of the RA reactor, a disruption of foreign delivery of new control equipment caused its conversion to a 'dormant' facility, and it is still out of operation. Therefore, the future status of the RA reactor presents an engineering and scientific challenge to the engineers and scientists from Yugoslavia and other countries that may be interested to participate. To attract their attention on the subject, principal features of the RA reactor and its present status are described in detail, based on a recent engineering economic and safety evaluation. A comparative review of the world research reactors is also presented.(author)

  11. Detection of fission products release in the research reactor 'RA' spent fuel storage pool

    International Nuclear Information System (INIS)

    Matausek, M.V.; Vukadin, Z.; Pavlovic, S.; Maksin, T.; Idakovic, Z.; Marinkovic, N.

    1997-05-01

    Spent fuel resulting from 25 years of operating the 6.5/10 MW thermal heavy water moderated and cooled research reactor RA at the VINCA Institute is presently all stored in the temporary spent fuel storage pool in the basement of the reactor building. In 1984, the reactor was shut down for refurbishment, which for a number of reasons has not yet been completed. Recent investigations show that independent of the future status of the research reactor, safe disposal of the so far irradiated fuel must be the subject of primary concern. The present status of the research reactor RA spent fuel storage pool at the VINCA Institute presents a serious safety problem. Action is therefore initiated in two directions. First, safety of the existing spent fuel storage should be improved. Second, transferring spent fuel into another, presumably dry storage space should be considered. By storing the previously irradiated fuel of the research reactor RA in a newly built storage space, sufficient free space will be provided in the existing spent fuel storage pool for the newly irradiated fuel when the reactor starts operation again. In the case that it would be decided to decommission the research reactor RA, the newly built storage space would provide safe disposal for the fuel irradiated so far

  12. Feasibility study to restart the research reactor RA with a converted core

    International Nuclear Information System (INIS)

    Matausek, M.V.; Plecas, I.; Marinkovic, N.

    1999-01-01

    Main options are specified for the future status of the 6.5 MW heavy water research reactor RA. Arguments pro and contra restarting the reactor are presented. When considering the option to restart the RA reactor, possibilities to improve its neutronic parameters, such as neutron flux values and irradiation capabilities, are discussed, as well as the compliance with the worldwide activities of Reduced Enrichment for Research and Test Reactors (RERTR) program. Possibility of core conversion is examined. Detailed reactor physics design calculations are performed for different fuel types and uranium loading. For different fuel management schemes results are presented for the effective multiplication factor, power distribution, fuel burnup and consumption. It is shown that, as far as reactor core parameters are considered, conversion to lower enrichment fuel could be easily accomplished. However, conversion to the lower enrichment could only be justified if combined with improvement of some other reactor attributes. (author)

  13. Design study of eventual core conversion for the research reactor RA

    International Nuclear Information System (INIS)

    Matausek, M. V.; Marinkovic, N.

    1998-01-01

    Main options are specified for the future status of the 6.5 MW heavy water research reactor RA. Arguments pro and contra restarting the reactor are presented. When considering the option to restart the RA reactor, possibilities to improve its neutronic parameters, such as neutron flux values and irradiation capabilities are discussed, as well as the compliance with the worldwide activities of Reduced Enrichment for Research and Test Reactors (RERTR) program. Possibility of core conversion is examined. Detailed reactor physics design calculations are performed for different fuel types and uranium loading. For different fuel management schemes results are presented for the effective, multiplication factor, power distribution, fuel burnup and consumption. It is shown that, as far as reactor core parameters are considered, conversion to lower enrichment fuel could be easily accomplished. However, conversion to the lower enrichment could only be justified if combined with improvement of some other reactor attributes. (author)

  14. Causes of extended shutdown state of 'RA' research reactor in Vinca Institute

    International Nuclear Information System (INIS)

    Pesic, M.; Kolundzija, V.; Ljubenov, V.; Cupac, S.

    2001-01-01

    This paper describes the causes and reasons for extended shutdown state of RA research reactor in the 'Vinca' Institute of Nuclear Sciences. Technical and legal matters that led to decision to stop RA reactor operation in 1984 and further problems related to maintenance and preparation for continuation of operation are given. Influence of nuclear policy of Yugoslav government and the 'Vinca' Institute at prolongation of the reactor shutdown state, as consequence of changing of nuclear programme in the country and the world are discussed and underlined. An overview of the legislation in the field of nuclear safety and regulatory control of radiation sources and radioactive materials in Yugoslavia is presented. (author)

  15. RA Research reactor, Part I: Technical and operational properties of the RA reactor; Analiza sigurnosti rada Reaktora RA I-III, Deo I: Tehnicke i pogonske karakteristike reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N; Zecevic, V; Nikolic, M; Popovic, B; Milosevic, M; Milic, M; Strugar, P; Pesic, M; Nikolic, V; Rajic, M; Radivojevic, J; Jankovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    RA reactor is a research reactor with rather high power density. Apart from research it is used for isotope production and industrial applications due to high reactivity excess (about 11%). It is a thermal reactor, heavy water moderated, cooled by D{sub 2}O, and H{sub 2}O, with a graphite reflector. Nominal power is 6.5 MW. Fuel is 2% enriched metal uranium, reactor core height is 1220 mm, and diameter is 1405 mm. Reactor lattice is square with lattice pitch 130 mm. There is 6 horizontal experimental channels and a graphite column. There is a total of 84 fuel channels and 45 experimental channels in the core. Maximum thermal neutron flux is 5.5 10{sup 13} n/cm{sup 2} s at nominal power level.

  16. Research nuclear reactor RA - Annual Report 1990 with the comparative evaluation for the period 1986-1990

    International Nuclear Information System (INIS)

    Sotic, O.

    1990-12-01

    Annual report concerning the project 'RA research nuclear reactor' for 1990, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities [sr

  17. Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976; Pogon i odrzavanje reaktora RA, Izvestaj o radu u 1976. godini

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-12-15

    During 1976 the Ra reactor was operating for about 30% shorter period than usual. The reason were extraordinary repair activities within regular and investment maintenance as well as repair of failures caused by neglected maintenance during previous 6 years. Delay was caused by unavailability of fuel (2% enriched fuel elements are spent) and the new 80% enriched fuel demanded experimental and theoretical analyses before being introduced into the core. Safety analyses concerned with using 80% enriched fuel both experimental and theoretical were successfully fulfilled. The December 1976 successful experimental campaign can be marked as end of the 17 years period of using 2% enriched fuel and start of the new period of using highly enriched fuel. This is significant not only for the reactor itself but for the users, because it would result in increase of neutron flux by 50% with the increase of costs by only 4%. Demand was submitted for obtaining the final license for transition operating regime with highly enriched fuel which would save at least 2 200 000 dinars. This will enable reactor operation in 1977 and later on, without interruption by 'critical' and other experiments related to new highly enriched fuel. A high number of repair and other urgent activities were fulfilled in order to enable safe operation. Some of these activities were done never before and some were neglected during past 6 years. The most important tasks were: purchase of Al tubes made of special alloy, fabrication and mounting of the fuel channel; overall investigation of reactor vessel leakage; repair of the heavy water pump; exchange of two vertical channels. basic equipment for construction of emergency cooling system was purchased. Hot cells are equipped for independent utilisation. [Serbo-Croat] Reaktor RA je u 1976. godini radio za oko 30% krace vreme od uobicajenog. Razlog su bill izuzetno veliki obim remontnih i drugih radova u okviru tekuceg i investicionog odrzavanja, kao i krupnih

  18. Neutron spectrometric evaluations in the Argentine research reactor RA-1

    International Nuclear Information System (INIS)

    Kunst, J.J.; Papadopulos, S.B.; Gregori, B.N.; Cruzate, J.A.

    1998-01-01

    Full text: The determination of the quantities dose equivalent H * (10) and personal dose equivalent Hp(10) in mixed field (n,γ) needs the knowledge of the related spectrum. In order to fulfill this aim spectrometer system has been built based on the combination of polyethylene spheres of different diameters (Bonner Spheres System-BSS) and a He 3 proportional counter detector sensitive to thermal neutrons. The detector is located in the geometrical centre of each of the spheres and has an associated electronics with a charge preamplifier, an amplifier and a multichannel system that allows the outgoing spectrum analysis. In order to determine the neutron spectrum a deconvolution method is applied based on the LOUHI82 code. In this work are shown the spectra and the related values of H * (10) that have been got in five places of the reactor and in the command room with the BSS. (author) [es

  19. Biological dosimetry studies for boron neutron capture therapy at the RA-1 research reactor facility

    International Nuclear Information System (INIS)

    Trivillin, Veronica A.; Heber, Elisa M.; Itoiz, Maria E.; Schwint, Amanda E.; Castillo, Jorge

    2004-01-01

    Initial physical dosimetry measurements have been completed using activation spectrometry and thermoluminescent dosimeters to characterize the BNCT facility developed at the RA-1 research reactor operated by the National Atomic Energy Commission in Buenos Aires. Biological dosimetry was performed employing the hamster cheek pouch oral cancer model previously validated for BNCT studies by our group. Results indicate that the RA-1 neutron source produces useful dose rates for BNCT studies but that some improvements in the initial configuration will be needed to optimize the spectrum for thermal-neutron BNCT research applications. (author)

  20. Accident conditions analysis of spent fuel storage pool RA research reactor in Vinca; Analiza udesnih stanja u odlagalistu isluzenog goriva istrazivackog rektora RA u Vinci

    Energy Technology Data Exchange (ETDEWEB)

    Jovic, V; Jovic, L [Institute of Nuclear Sciences VINCA, Belgrade (Serbia and Montenegro)

    2000-07-01

    Based on Safety analysis of the spent fuel pool RA research reactor in Vinca, conditions and possibilities accident sequences in present configuration storage facility are considered (author) [Serbo-Croat] Na osnovu Analize sigurnosti odlagalista isluzenog goriva istrazivackog reaktora RA u Vinci razmatraju se uslovi i mogucnosti pojave udesnih stanja u postojecoj konfiguraciji odlagalista (author)

  1. Criticality safety studies involved in actions to improve conditions for storing 'RA' research reactor spent fuel

    International Nuclear Information System (INIS)

    Matausek, M.; Marinkovic, N.

    1998-01-01

    A project has recently been initiated by the VINCA Institute of Nuclear Sciences to improve conditions in the spent fuel storage pool at the 6.5 MW research reactor RA, as well as to consider transferring this spent fuel into a new dry storage facility built for the purpose. Since quantity and contents of fissile material in the spent fuel storage at the RA reactor are such that possibility of criticality accident can not be a priori excluded, according to standards and regulations for handling fissile material outside a reactor, before any action is undertaken subcriticality should be proven under normal, as well as under credible abnormal conditions. To perform this task, comprehensive nuclear criticality safety studies had to be performed. (author)

  2. RA Research nuclear reactor, Part II - radiation protection at the RA nuclear reactor in 1984; Istrazivacki nuklearni reaktor RA - Deo II - zastita od zracenja kod nuklearnog reaktora RA u 1984. godini

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M; Ajdacic, N; Zaric, M; Vukovic, Z [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1984-12-15

    Radon protection tasks which enable safe operation of the RA reactor, and are defined according the the legal regulations and IAEA safety recommendations are sorted into four categories in this report: (1) Control of the working environment, dosimetry at the RA reactor; (2) Radioactivity control in the vicinity of the reactor and meteorology measurements; (3) Collecting and treatment of fluid effluents; and (4) radioactive wastes, decontamination and actions. Each category is described as a separate annex of this report.

  3. RA Research reactor, Report for the period January-December 2002

    International Nuclear Information System (INIS)

    Pesic, M.; Sotic, O.; Nikolic, A.

    2003-01-01

    During 2002 activities at the RA research nuclear reactor were performed according to the action plan related to maintenance of this facility and Contract about financing the reactor for the period January-december 2002 signed in June 2002 with the Ministry of science, technologies and development of the Republic of Serbia. In July 2002. the the Government of Serbia has finally declared a decision about permanent shutdown of the RA reactor, initiation of reactor decommissioning process, and solving the problem of the spent fuel storage in the reactor building. These decisions demanded new organizational structure in the Institute for efficient completion of the mentioned programs. As previously, the main activities during the reporting period involved maintenance of the systems which must be operated permanently or occasionally and the systems and equipment of special importance for security of the facility. In addition to regular maintenance activities, a series of investment tasks were completed in the reactor building. Special activities were related to nuclear fuel inspection conducted by the IAEA. Significant cooperation with IAEA was achieved after September 2001, when Yugoslavia became again a member of the IAEA. During 2002 a number of significant activities were prepared and completed: transport of fresh highly enriched fuel to Russia; signing the contract with IAEA concerning work on future RA reactor decommissioning program; preliminary analysis and preparation for storage of spent nuclear fuel and future decommissioning. The contracts signed with the IAEA are in complete agreement with decisions of the Serbian government. It is indispensable to create a regulatory body on the government level which would provide needed conditions for completion of these complicated tasks and control performance. At this moment no such body exists and no financial support is provided although this is a condition for obtaining support from the IAEA or any other

  4. Description of the RA-3 research reactor as a model facility

    International Nuclear Information System (INIS)

    Vicens, Hugo E.; Quintana, Jorge A.

    2001-01-01

    The Argentine RA-3 reactor is described as a model facility for the information to be provided to the IAEA in accordance with the requirements of the Model Additional Protocol. RA-3 reactor was designed as a 5 MW swimming pool reactor, moderated and cooled with light water. Its fuel was 90% enriched uranium. The reactor started its operation in 1967, has been modified and improved in many components, including the core, that now is fueled with moderately enriched uranium

  5. A Small-Animal Irradiation Facility for Neutron Capture Therapy Research at the RA-3 Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Emiliano Pozzi; David W. Nigg; Marcelo Miller; Silvia I. Thorp; Amanda E. Schwint; Elisa M. Heber; Veronica A. Trivillin; Leandro Zarza; Guillermo Estryk

    2007-11-01

    The National Atomic Energy Commission of Argentina (CNEA) has constructed a thermal neutron source for use in Boron Neutron Capture Therapy (BNCT) applications at the RA-3 research reactor facility located in Buenos Aires. The Idaho National Laboratory (INL) and CNEA have jointly conducted some initial neutronic characterization measurements for one particular configuration of this source. The RA-3 reactor (Figure 1) is an open pool type reactor, with 20% enriched uranium plate-type fuel and light water coolant. A graphite thermal column is situated on one side of the reactor as shown. A tunnel penetrating the graphite structure enables the insertion of samples while the reactor is in normal operation. Samples up to 14 cm height and 15 cm width are accommodated.

  6. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1986; Istrazivacki nuklearni reaktor RA, deo 1, pogon i odrzavanje nukleanog reaktora RA u 1986. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Badrljica, R; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1986-12-01

    In order to enable future reliable operation of the RA reactor, according to new licensing regulations, three major tasks started in 1984 were fulfilled: building of the new emergency system, reconstruction of the existing ventilation system, and reconstruction of the power supply system. Simultaneously in 1985/1986 renewal of the instrumentation and reconstruction of the system for handling and storage of the spent fuel in the reactor building have started. Design projects for these tasks are almost finished and the reconstruction of both systems is expected to be finished until 1988 and mid 1989 respectively. RA reactor Safety report was finished according to the recommendations of the IAEA. Investments in 1986 were used for 8000 kg of heavy water, maintenance of reactor systems and supply of new components, reconstruction of reactor systems. This report includes 8 annexes concerning reactor operation, activities of services and financial issues. [Serbo-Croat] Sa ciljem da se obezbedi pouzdan rad reaktora RA a u skladu sa zakonskim propisima, zavrsena su tri velika zahvata zapoceta 1984: izgradnja novog sistema za udesno hladjenje, rekonstrukcija postojeceg sistema za ventilaciju, i modernizacija reaktorske instrumentacije. Istovremeno tokom 1985/1986. zapoceta je modernizacija instrumentacije i rekonstrukcija sistema za rukovanje i skladistenje iskoriscenog goriva u zgradi reaktora. Projekti za navedene radove su vec zavrseni ili su u zavrsnoj fazi, a ocekuje se da ce rekonstrukcija oba sistema biti zavrsena do kraja 1988. odnosno sredine 1989. godine. Izrada izvestaja o sigurnosti reaktora RA, prema preporukama MAAE zavrsena je 1986. Investiciona ulaganja na reaktoru Ra u 1986. iskoriscena su za: nabavku 8000 kg teske vode, za investiciono odrzavanje reaktorskih sistema i nabavku opreme, za rekonstrukciju reaktorskih sistema. Ovaj izvestaj sadrzi 8 priloga koji opisuju rad reaktora, rad strucnih sluzbi i finansiranje.

  7. Research nuclear reactor RA - Annual Report 1975. Operation and maintenance; Istrazivacki nuklearni reaktor RA - Izvestaj za 1975. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    The plan for 1975 was successfully fulfilled. This is reflected in research related to improvement of operating properties of the RA reactor, mostly due to the effort of the RA staff employed in operation and maintenance of the reactor. Fuel saving achieved by this activity amounted to about 38% (80% enriched fuel). Preliminary work is done, concerned with new reactor core with highly enriched fuel. This is a significant saving as well. New fuel elements have arrived at the end of this year. It is going to enable increase of neutron flux by 50% without changing the nominal operating power. The possibility of further improvement of the reactor are analyzed, to enable material testing and production of radioactive sources. Mid term plan for reactor operation was made according to this analysis. It is planned to further increase the neutron flux in isolated smaller zones, and building new experimental loops with cooling and fast neutron converters. Much was done to increase the safety level of reactor operation and preparing the safety report. [Serbo-Croat] Izvrsenje zadataka u 1975. godini bilo je uspesno. To se ogleda u povecanju istrazivackog rada vezanog za poboljsanje eksploatacionih karakteristika reaktora RA, pretezno koriscenjem sopstvenog kadra angazovanog u pogonu i odrzavanju reaktora. Ovim radom postignuta je usteda goriva od oko 38% (80% obogaceno gorivo). Izvrseni su preliminarni radovi na prevodjenju reaktora RA na novo gorivo, sto je takodje velika usteda. Novo gorivo je stiglo krajem godine i ono ce obezbediti porast neutronskog fluksa od 50%, bez promene nominalne snage reaktora. Izvrsena je analiza mogucnosti daljeg usavrsavanja reaktora za potrebe ispitivanja materijala kao i proizvodnju radioaktivnih izvora. Na osnovu ove analize nacinjen je srednjorocni program rada reaktora RA sa tezistem na daljem povecanju fluksa u izdvojenim manjim zonama i ugradnju 'hladjenih petlji' i brzih konvertora. Mnogo je ucinjeno na povecanju stepena sigurnosti

  8. Corrosion of aluminium-clad spent fuel at RA research reactor

    International Nuclear Information System (INIS)

    Pesic, M.; Maksin, T.; Dobrijevic, R.; Idjakovic, Z.

    2003-01-01

    Almost 95% of all spent fuel elements of the RA research reactor in the Vinca Institute of Nuclear Sciences, Belgrade, Serbia and Montenegro, are stored in 30 aluminium barrels and about 300 stainless steel channel-holders in the temporary spent fuel storage water pool. The first activities of sludge and water samples, taken from the pool, were measured in 1996-1997 and were followed by analysis of chemical composition of samples. Visual inspections of fuel elements in some stainless steel tubes and of the fuel channels stored in the reactor core have shown that some deposits cover aluminium cladding. Stains and surface discoloration are noted on many of the spent fuel elements that were examined visually during the core unloading and inspections carried out in 1979 - 1984. Some of water samples, taken from pool, about a 150 stainless steel tubes and 16 barrels have shown very high 137-Cs activity compared to low activity measured in pool water. It was concluded that aluminium cladding of the fuel elements was penetrated due to corrosion process. Study on influence of water corrosion processes in the RA reactor storage pool was started within the framework of the IAEA CRP 'Corrosion of Research Reactor Aluminium-Clad Spent Fuel in Water' in 2002. The first test rack with various aluminium and stainless steel coupons, supplied by the IAEA, was immersed in the pool already in 1996. New racks were immersed in 2002 and 2003. The rack immersed in 1996 was taken out from the pool in 2002 and the rack immersed in 2002 was taken out in 2003. Results of the examination of these racks, carried out according to the strategy and the protocol, proposed by the IAEA, are described in this paper. (author)

  9. Operation of the RA research nuclear reactor under forced regime; Rad istrazivackog nuklearnog reaktora RA u forsiranom rezimu

    Energy Technology Data Exchange (ETDEWEB)

    Mitrovic, S [Institut za nuklearne nauke Boris Kidric, Vinca, Beograd (Yugoslavia)

    1964-07-01

    Ra reactor was designed for operation at nominal power of 6.5 MW and under forced regime. From the start of operation in 1959 until the general refurbishment in 1963 it was not operated under forced regime. At reactor power of 10 MW the mean thermal neutron flux increases from 3 to 4.6 10{sup 13} n cm{sup -2} sec{sup -1}, the maximum neutron flux increases from 6 to 9.3 10{sup 13} n cm{sup -2} sec{sup -1}, and at the exit of the experimental channel it increases from 5 to 7.7 10{sup 9} n cm{sup -2} sec{sup -1}. In order to achieve safer and more suitable operating conditions, winter period of 1963 was chosen for the first increase of reactor power level, because of low temperatures in the secondary coolant loop. This paper contains the most relevant data concerned with the reactor operation at increased power.

  10. RA Research reactor, Annual report 1971; Istrazivacki nuklearni reaktor RA - Izvestaj za 1971. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1971-12-15

    During 1971, the RA Reactor was operated at nominal power of 6.5 MW for 190 days, and 50 days at lower power levels. Total production mounted to 31606 MWh which is 5.3% higher than planned, and the highest annual level since the reactor started operation. Reactor was used for irradiation and experiments according to the demand of 425 users, of which 370 from the Institute and 55 external users. This report contains detailed data about reactor power and experiments performed in 1971. Discrepancies from the action plan, meaning higher production was achieved in June and December due to special demand of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to power cuts during reactor operation. There was no longer interruption caused by failures of the equipment. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. Shorter interruptions resulted from breaking of connectors in the technical water pipe system caused by soil sliding near the pumping station on the Danube. Total personnel exposure dose was lower than during previous years. There was no accident nor any event that could be called accidental. Decontamination od surfaces was less than during previous years. It was concluded that the successful operation in 1971 resulted from efficient work during past years. But, some of the activities were interrupted due to undefined policy concerned with operation of the RA reactor and financial issues. This involves study of the possibility to use highly enriched fuel that would increase the useful neutron flux and the reactor compatibility with similar reactors for the future ten years. Another project that has been interrupted is construction of the emergency core cooling system which is important for the reactor safety. Financial problems have influenced not only the reactor operation but the number of employees, which could cause negative

  11. RA Reactor applications, Annex A

    International Nuclear Information System (INIS)

    Cupac, S.; Vukadin, Z.

    2000-01-01

    Full text: In 2000 Ra reactor was not operated. New instrumentation is not complete, without it, it is not possible to think about reactor start-up. Since 1985, when reactor operation was forbidden, there are 480 fuel elements left in 48 fuel channels in the reactor core. Heavy water was removed from the reactor core because of the repair of the heavy water pumps in 1986. The old instrumentation was removed. Eleven years after being left to its own destiny, it would be difficult to imagine that anybody would think of reactor restart without examining the state of reactor vessel and other vital reactor components. Maintaining the reactor under existing conditions without final decision about restart or permanent shutdown is destructive for this nuclear facility. The existing state that pertains for more than 10 years would have only one result, destruction of the RA reactor [sr

  12. RA Reactor applications, Annex A

    International Nuclear Information System (INIS)

    Cupac, S.; Vukadin, Z.

    1998-01-01

    Full text: In 1998 Ra reactor was not operated. New instrumentation is not complete, without it, it is not possible to think about reactor start-up. Since 1985, when reactor operation was forbidden, there are 480 fuel elements left in 48 fuel channels in the reactor core. Heavy water was removed from the reactor core because of the repair of the heavy water pumps in 1986. The old instrumentation was removed. Eleven years after being left to its own destiny, it would be difficult to imagine that anybody would think of reactor restart without examining the state of reactor vessel and other vital reactor components. Maintaining the reactor under existing conditions without final decision about restart or permanent shutdown is destructive for this nuclear facility. The existing state that pertains for more than 10 years would have only one result, destruction of the RA reactor [sr

  13. RA Reactor applications, Annex A

    International Nuclear Information System (INIS)

    Cupac, S.; Vukadin, Z.

    1996-01-01

    Full text: In 2000 Ra reactor was not operated. New instrumentation is not complete, without it, it is not possible to think about reactor start-up. Since 1985, when reactor operation was forbidden, there are 480 fuel elements left in 48 fuel channels in the reactor core. Heavy water was removed from the reactor core because of the repair of the heavy water pumps in 1986. The old instrumentation was removed. Eleven years after being left to its own destiny, it would be difficult to imagine that anybody would think of reactor restart without examining the state of reactor vessel and other vital reactor components. Maintaining the reactor under existing conditions without final decision about restart or permanent shutdown is destructive for this nuclear facility. The existing state that pertains for more than 10 years would have only one result, destruction of the RA reactor [sr

  14. Current activities on improving storage conditions of the research reactor RA spent fuel - Part II

    International Nuclear Information System (INIS)

    Matausek, M.V.; Kopecni, M.; Vukadin, Z.; Plecas, I.; Pavlovic, R.; Sotic, O.; Marinkovic, N.

    1998-01-01

    To minimize further corrosion and preserve integrity of aluminum barrels and the stainless steel channel-type containers that were found to contain leaking spent fuel, actions to improve conditions in the existing spent fuel storage pool at the RA research reactor were initiated. Technology was elaborated and equipment was produced and applied for removal of sludge and other debris from the bottom of the pool, filtration of the pool water, sludge conditioning in cement matrix and disposal at the low and medium waste repository at VINCA site. More sophisticated operations are to be performed together with foreign experts. Safety measures and precautions were determined. Subcriticality was proved under normal and/or possible abnormal conditions. (author)

  15. Regulations for RA reactor operation

    International Nuclear Information System (INIS)

    1980-09-01

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions [sr

  16. Prompt gamma neutron activation analysis facility at the RA-6 research reactor

    International Nuclear Information System (INIS)

    Sanchez, F. A.; Calzetta, O

    2004-01-01

    A prompt gamma neutron activation activation analysis facility was developed at the 500 kw thermal power RA-6 research reactor of the Bariloche Atomic Center, Argentina.This facility consist of a radial beam port with external positioning of the sample.The gamma radiation is reduced by a bismuth filter placed inside the extraction tube and the beam diameter is limited by a set of two collimators up to 5 cm.The neutron flux at the sample position is 7 10 6 n/cm 2 s with a Cadmium ratio of 20/1.The gamma detector is a 50 % efficiency type p HPGe rounded by a NaI(Tl) for Compton suppressioning.The gamma spectra is measured through 0 to 8.5 MeV.The background have counting rate of 350 cps without sample. In this work is shown the efficiency curve, the calculed sensibilities and the lower detection limits for B, Cd, Sm, Gd, H, Cl, Hg, Eu, Ti, Ag, Au, Mo. The RA-6's PGNAA facility is fully working, although the analytic capacity is under improvement [es

  17. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1984; Istrazivacki nuklearni reaktor RA - Deo I - Pogon, odrzavanje i eksploatacija nuklearnog reaktora RA u 1984. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Badrljica, R; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1984-12-15

    During the 1984 the reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981. Operation of the primary cooling system was changed in order to avoid appearance of the previously noticed aluminium oxyhydrate on the surface of the fuel element claddings. The new cooling regime enabled more efficient heavy water purification. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks are planned: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. Financing of the planned activities will be partly covered by the IAEA. this Part I of the report includes 8 Annexes describing in detail the reactor operation, and 6 special papers dealing with the problems of reactor operation and utilization.

  18. RA reactor operation and maintenance

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-02-01

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air

  19. RA Research reactor, Annual report 1968 - Operation and maintenance; Istrazivacki nuklearni reaktor RA - Izvestaj za 1968. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1968-12-15

    During 1968, the RA Reactor was operated at nominal power of 6.5 MW for 190 days, and during 50 days at lower power levels. Total production amounted to 31051 MWh which is 3.5% higher than planned. reactor was used for irradiation and experiments according to the demand of 600 users, of which 517 from the Institute and 83 externals users. This report contains detailed data about reactor power and experiments performed in 1968. It is concluded that the reactor operation was more successful than during previous years. There was only one longer interruption which lasted 27 hours because of the power cut on the cable for the pump station on Danube. Number of safety shutdowns were at the same level as during last year. The only significant incident in 1968 was air contamination with the radioactive argon in the reactor hall. The reactor operation was not interrupted although the hall was evacuated for two hours. The was no significant exposure of the staff. In April and September the integral dosed were higher than during other months because of the accident during refueling (mixing the slugs with irradiated and fresh fuel). There was no significant surface contamination, i.e. the decontaminated surface were negligible. Due to 'mixing' refueling scheme. [Serbo-Croat] Reaktor RA je u 1968. godini radio na nominalnoj snazi od 6,5 MW 190 dana i 50 dana na manjim snagama. Ukupni rad iznosio je 31051 MWh odnosno 3,5% vise od planiranog. Reaktor je koriscen za ozracivanja i eksperimente za 600 korisnika od cega 517 iz Instituta i 83 za korisnika izvan Instituta. Ovaj izvestaj sadrzi detaljne podatke o radu i eksperimentima koji su obavljani. Zakljucuje se da je reaktor radio uspesnije nego prethodnih godina. U toku 1968. godine samo je jedan duzi prekid u radu od 27 casova izazvan zbog proboja kablovske glave na odvodu za pumpnu stanicu na Dunavu. Sigurnosna zaustavljanja bila su na proslogodisnjem nivou. Jedini znacajniji incident u 1968. godini, bio je kontaminacija vazduha

  20. RA Research reactor, Annual report 1970 - Operation and maintenance; Istrazivacki nuklearni reaktor RA - Izvestaj za 1970. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1970-12-15

    During 1970, the RA Reactor was operated at nominal power of 6.5 MW for 160 days, and 40 days at lower power levels. Total production mounted to 25968 MWh which is 3.87% higher than planned. The action plan was changed compared to the previous years because of sending the heavy water to France for re-concentration. Isotopic concentration of the heavy water was decreased to 99.05% and now after re-concentration it is 99.96%. Discrepancy from the action plan, in September was caused by the delay return of the heavy water for administrative and transportation difficulties. The restart of the reactor in September was postponed because the cladding of one fuel element was damaged immediately after the start-up, and the reactor had to be shutdown. In October and November reactor was in operation 28 and 25 days respectively which enabled to make up for the lost time. Reactor was used for irradiation and experiments according to the demand of 390 users, 340 from the Institute and 50 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. Shorter interruptions were caused only by difficulties with water supply pipes and sliding of the soil. Reactor was only twice scram shutdown because of the false signals caused by failures of the electronic control instrumentation. the period when reactor was not in operation was used for inspection of the reactor vessel internals. By using special TV cameras and telescopes, it was found that the there are no signs of corrosion on the reactor vessel, e.e. that the internals are in a very good state. Simultaneously, connection for the pipes of future emergency core cooling system were constructed. During 1970, the spent fuel was repacked from fuel channels into special aluminium casks. Four casks containing 660 fuel slugs was deposited int the storage pool No.4. There is now 18 casks with 2951 spent fuel slugs in

  1. RA Research reactor, Annual report 1969; Istrazivacki nuklearni reaktor RA - Izvestaj za 1969. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1969-12-15

    During 1969, the RA Reactor was operated at nominal power of 6.5 MW for 200 days, and 15 days at lower power levels. Total production mounted to 31131 MWh which is 3.77% higher than planned. Reactor was used for irradiation and experiments according to the demand of 463 users from the Institute and 63 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. If there had been no problems with power supply during last three months and Danube low water level in September and October the past year would have been the most successful up to now. The number od scram shutdowns was not higher than during past two years in spite of the difficulties in the last quarter. There were three incidents which caused higher personnel exposure during operation. One, was the destruction of the canner with silver (because the time spent in the core was too long) which caused the surface contamination of the platform, the background radiation was 10 to 100 times higher than regular. The other two cases were caused by failure of the device for handling the fuel slugs in the fuel channels during refuelling. Reactor refuelling was done four times during 1969, and 499 fresh fuel slugs were used. Refuelling applied the approach of 'mixing' the fresh fuel slugs with the 'old' fuel slugs in the fuel channel. Decontamination of surfaces was on the same level as previously in spite of the problems with silver. Since two staff members have left, the present number od employees is now the minimum needed for reactor operation and maintenance. It is stated that the operation of components and equipment is on sufficiently high level after ten years of reactor operation. The action plan for 1970 is made according to the same principles as in previous four years but the planned production is decreased to 25000 MWh, because control of important components is needed after ten

  2. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1983; Istrazivacki nuklearni reaktor RA - Deo I - Pogon, odrzavanje i eksploatacija nuklearnog reaktora RA u 1983. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Kozomara-Maic, S; Cupac, S; Raickovic, N; Radivojevic, J; Badrljica, R; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1983-12-15

    After regular shutdown in November 1982, inspection of the fuel elements from the RA reactor core which was done from December 1982 - February 1983 has shown that there are deposits of aluminium oxides on the surface of the fuel cladding. After restart The RA reactor was operated at power levels from 1.8 - 2 MW, with 80% enriched uranium dioxide fuel elements. It was found that there was no corrosion of the fuel element cladding and that it was not possible to find the cause of surface deposition on the cladding surfaces without further operation. It was decided to purify the heavy water permanently during operation and to increase the heavy water flow by operating two pumps. This procedure was adopted in order to decrease the possibility of corrosion. The Safety committee of the Institute has approved this procedure for operating the RA reactor in 1983. The core was made of 80% enriched fuel, critical experiments were done until June 1983, and after that the operation was continued at power levels up to 2 MW. [Serbo-Croat] Pregledom nuklearnog goriva iz tehnoloskih kanala reaktora RA koji je izvrsen u periodu decembear 1982-feburuar 1983. godine nakon zaustavljanja reaktora po isteku novembarske kampanje 1982. godine, ustanovljeno je da ponovo dolazi do stvaranja taloga u obliku hidratisanih oksida aluminiuma na kosuljicama gorivnih elemenata. Nakon ponovnog pustanja u rad, reaktor je do novembra 1981. godine neprekidno bio u pogonu na snagama 1,8 - 2 MW. Jezgro je bilo formirano iskljucivo sa od gorivnih elemenata sa 80% obogacenim uran dioksidom. Utvrdjeno je da kosuljica gorivnog elementa nije korodirala, i da se bez nastval rada ne moze utvrditi uzrok pojave taloga na povrsini kosuljice. Da bi se mogucnost korozije aluminjumskih komponenti u primarnom kolu raktora svela na sto manju meru odluceno je da se vrsi neprekidno preciscavanje teske vode i da se istovremeno poveca protok teske vode radom dve pumpe, Komitet za sigurnost Instituta odobrio je ovakav nacin

  3. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1988; Istrazivacki nuklearni reaktor RA, deo 1, pogon i odrzavanje nukleanog reaktora RA u 1988. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Badrljica, R; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1988-12-15

    According to the action plan for 1988, operation of the RA reactor should have been restarted in October, but the operating license was not obtained. Control and maintenance of the reactor components was done regularly and efficiently dependent on the availability of the spare parts. The major difficulty was maintenance of the reactor instrumentation. Period of the reactor shutdown was used for repair of the heavy water pumps in the primary coolant loop. With the aim to ensure future safe and reliable reactor operation, action were started concerning renewal of the reactor instrumentation. Design project was done by the soviet company Atomenergoeksport. The contract for constructing this equipment was signed, and it is planned that the equipment will be delivered by the end of 1990. In order to increase the space for storage of the irradiated fuel elements and its more efficient usage, projects were started concerned with reconstruction of the existing fuel handling equipment, increase of the storage space and purification of the water in the fuel storage pools. These projects are scheduled to be finished in mid 1989. This report includes 8 annexes concerning reactor operation, activities of services and financial issues. [Serbo-Croat] Prema planu za 1988. godinu, reaktor RA je trebalo da pusten u rad oktobra meseca, medjutim nije dobio dozvolu za nastavak rada. Kontrola i odrzavanje opreme izvrsavani su redovno i efikasno, u granicama koje su diktirane raspolozivoscu repromaterijala i rezervnih delova. Najvecu poteskocu pricinjavalo je odrzavanje instrumentacije. Period stajanja u 1988. godini iskoriscen je za remont teskovodnih pumpi u primarnom kolu hladjenja. U cilju povecanja pouzdanosti rada reaktora zapoceti su radovi na modernizaciji instrumentacije, projekat je izradjen u sovjetskoj organizaciji Atomenergoeksport, sklopljen je ugovor o izradi ove opreme koja bi trebalo da bude isporucena do kraja 1990. U cilju povecanja prostora za skladistenje ozracenog

  4. RA Research reactor, Annual report 1973; Istrazivacki nuklearni reaktor RA - Izvestaj za 1973. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1973-12-15

    During 1973, RA reactor was operated at nominal power for 4687 hours and 54 hours at lower power levels. The total production was 30504 MWh which is 1.6% higher than planned. Practically there was no discrepancies from the plan, since the action plan was corrected at the beginning of this year caused by the demand of changing the schedule for refuelling for the purpose of 'power excursion' experiment. The reactor was used for irradiation and experiments according to the demand of 336 users. This report contains detailed data about reactor power and experiments performed in 1973. Total number safety shutdowns was 12, of which 7 were caused by power cuts. Three shutdowns caused by failures of the equipment were caused by failures of new electronic tubes. Two shutdowns were caused by the operators. There have been three shorter interruptions announced power cuts. Total personnel exposure dose was lower than during previous years. There were no accidents during this year. Decontamination of surfaces was less than during previous years. Practically there was no surface contamination, and the quantity of collected radioactive waste was lower than previously. There were no liquid radioactive effluents. It was concluded that the successful operation in 1973 has a special significance taking into account the financial crisis. There still remains a number of unsolved problems related to: completing the inventory of spare parts, exchange of some elements of the equipment, exchange of instrumentation, and purchase of the highly enriched fuel. [Serbo-Croat] Reaktor RA je u 1973. godini radio na nominalnoj snazi 4687 sati i 54 sata na manjim snagama. Ukupni rad iznosio je 30504 MWh odnosno 1,6% vise od planiranog. Prakticno nije bilo odstupanja od plana rada koji je pocetkom godine korigovan zbog promene planiranih izmena goriva usled izvodjenja eksperimenta 'ekskurzije snage'. Reaktor je koriscen za ozracivanja i eksperimente za 336 korisnika. Ovaj izvestaj sadrzi detaljne

  5. RA Research nuclear reactor, Part 1, RA reactor operation and maintenance in 1993, with comparative review for the period 1991 - 1993, Annex 3

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1993-01-01

    RA reactor was not operated during 1993 because of the complete instrumentation exchange. Although it has been planned to exchange the complete instrumentation until the end of 1993, and to start reactor operation in the first half of 1993 this was not fulfilled because the instrumentation was not delivered until the end of 1993. Main activities during past seven years were related to construction of the emergency cooling system; repair and reconstruction of the system for handling the spent fuel and improvement of spent fuel storage conditions; exchange of the aged instrumentation. Other reactor components and systems, reactor core, primary coolant loop and gas circulation system are in good condition concerning future start-up [sr

  6. Collaborative Physical and Biological Dosimetry Studies for Neutron Capture Therapy at the RA-1 Research Reactor Facility

    Energy Technology Data Exchange (ETDEWEB)

    David W. Nigg; Amanda E. Schwint; John K. Hartwell; Elisa M. Heber; Veronica Trivillin; Jorge Castillo; Luis Wentzeis; Patrick Sloan; Charles A. Wemple

    2004-10-01

    Initial physical dosimetry measurements have been completed using activation spectrometry and thermoluminiscent dosimeters to characterize the BNCT irradiation facility developed at the RA-1 research reactor operated by the Argentine National Atomic Energy Commission in Buenos Aires. Some biological scoping irradiations have also been completed using a small-animal (hamster) oral mucosa tumor model. Results indicate that the RA-1 neutron source produces useful dose rates but that some improvements in the initial configuration will be needed to optimize the spectrum for thermal-neutron BNCT research applications.

  7. Collaborative Physical and Biological Dosimetry Studies for Neutron Capture Therapy at the RA-1 Research Reactor Facility

    Energy Technology Data Exchange (ETDEWEB)

    Nigg, D.W.; Schwint, A.E.; Hartwell, J.K.; Heber, E.M.; Trivillin, V.; Castillo, J.; Wentzeis, L.; Sloan, P.; Wemple, C.A.

    2004-10-04

    Initial physical dosimetry measurements have been completed using activation spectrometry and thermoluminiscent dosimeters to characterize the BNCT irradiation facility developed at the RA-1 research reactor operated by the Argentine National Atomic Energy Commission in Buenos Aires. Some biological scoping irradiations have also been completed using a small-animal (hamster) oral mucosa tumor model. Results indicate that the RA-1 neutron source produces useful dose rates but that some improvements in the initial configuration will be needed to optimize the spectrum for thermal-neutron BNCT research applications.

  8. RA Research reactor, Annual report 1972; Istrazivacki nuklearni reaktor RA - Izvestaj za 1972. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1972-12-15

    During 1972, the total production was 31151 MWh which is 3.8% higher than planned. The reactor was used for irradiation and experiments according to the demand of 381 users, of which 340 from the Institute and 41 external users. This report contains detailed data about reactor power and experiments performed in 1972. Discrepancies from the action plan, meaning higher production was achieved due to special demands of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to announced power cuts. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. There were no longer interruptions. One shorter interruption (shorter than 24 hours) caused by removal of a UO{sub 2} capsule from the core, placed there for measuring heat transfer. Total personnel exposure dose was lower than during previous years. One accident caused contamination with gases and aerosols containing mainly shot-living isotopes. Decontamination od surfaces was less than during previous years. Practically there was no surface contamination that would demand action of the decontamination team, except for the regular decontamination after refueling. It was concluded that the successful operation in 1972 has a special significance having taking in account the financial crisis caused by the unresolved status of the reactor. It is emphasised, in the plan for the next year that there is an urgent need of making a long-term plan of rector application. It is indispensable to finish preparatory tasks for replacing the fuel with the highly enriched fuel elements by 1974, and building the core emergency cooling system. [Serbo-Croat] Ukupni rad Reaktora RA je u 1972. godini iznosio je 31151 MWh odnosno 3,8% vise od planiranog. Reaktor je koriscen za ozracivanja i eksperimente za 381 korisnika od cega 340 iz Instituta i 41 za korisnike izvan Instituta. Ovaj izvestaj sadrzi detaljne podatke o radu i

  9. RA Reactor applications, Annex A

    International Nuclear Information System (INIS)

    Martinc, R.; Cupac, S.; Stanic, A.

    1990-01-01

    RA reactor was not operated during the past five years due to the renewal and reconstruction of the reactor systems, which in underway. In the period from 1986-1990, reactor was operated only 144 MWh in 1986, for the need of testing the reactor systems and possibility of irradiating 125 I. Reactor will not be operated in 1991 because of the exchange of complete instrumentation which is planned to be finished by the end of 1991. It is expected to start operation in May 1992. That is why this annex includes the plan of reactor operation for period of nine months starting from from the moment of start-up. It is planned to operate the reactor at 0.02 MW power first three months, to increase the power gradually and reach 3.5 MW after 8 months of operation. It is foreseen to operate the reactor at 4.7 MW from the tenth month on [sr

  10. Research nuclear reactor RA - Annual Report 1990 with the comparative evaluation for the period 1986-1990; Istrazivacki nuklearni reaktor RA - Izvestaj za 1990. godinu uz uporedni pregled za period 1986 - 1990

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1990-12-15

    Annual report concerning the project 'RA research nuclear reactor' for 1990, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1990. godinu, koji finansira republicka zajednica za nauku SR Srbije po ugovoru br. 3705/1 sastoji se iz dva dela. Prvi deo obuhvata pogon i odrzavanje nuklearnog reaktora RA, sto predstavlja obavezu Odeljenja za reaktorski inzenjering u sastavu OOUR Instituta za multidisciplinarna istrazivanja i inzenjering RA. Drugi deo obuhvata poslove zastite od zracenja na reaktoru RA, sto predstavlja obavezu OOUR Instituta za zastitu od zracenja 'Zastita'. Naucno vece Instituta za multidisciplinarna istrazivanja i inzenjjring RA ocenilo je da sadrzina ovog izvestaja odgovara izvrsenim poslovima na reaktoru RA u 1989. godini. Pozitivno se ocenjuje obim i kvalitet izvrsenih radova kako u pogledu odrzavanja i rekonstrukcije reaktora, tako i u pogledu poslova zastite od zracenja izvrsenih kod njega.

  11. Safety analysis of the present status of the research reactor 'RA' at 'Vinca' Institute

    International Nuclear Information System (INIS)

    Jovic, V.; Jovic, L.; Zivotic, Z.; Milovanovic, Dj.

    1995-01-01

    Safety analysis of the nuclear facility which has been out of work for a long time and whose future is not defined at the present moment, can not be connected to the usual, normatively regulated system analysis procedure in both operational and accidental regimes. Therefore, the safety analysis of the present status of the present status of the reactor RA is related to system and components analysis which, in present conditions maintain their nuclear functions operational. In the first place, it refers to components and equipment in which radioactive radiation generation still exists and to installations and equipment maintaining radiation level below permitted limit. in the context of the analysis the following areas are being covered: present status characteristics, accidental events while operating period from 1959. to 1984., nuclear fuels and radioactive waste inventory, basic characteristics and status of safety-related systems and equipment, radiation protection, potential accident analysis at present status of the reactor RA, potential accidental situations due to natural events (earthquakes, water flood) or man-induced events and security. 8 refs

  12. Peak power factor determination of the RA-6 Argentinean Research Reactor using measurement-calculations correlations

    International Nuclear Information System (INIS)

    Sanchez, F. A.; Blaumann, H.; Lopasso, E.; Longhino, J

    2009-01-01

    The maximum power of a reactor is limited by the power peaking factor. During the design stage it is calculated with neutronic calculation codes. This is not enough for ensuring its value due to modelling approximations. For the RA-6s low enrichment new core a calculus-measurement correlation method have been applied. Position and magnitude of the maximum power density estimated by calculus are used by this method. For this work 249 cooper-gold alloy (1.55% Au) wires have been distributed along the core using 19 aluminium blades. Their positions have been selected using information given by a 5 groups PUMA reactor model. Wire s activity have been measured with a HPGe detector. Gold activity have been used only for verifying the calculated core spectrum. The measured power peaking factor was 2.48±0.3 (3σ), 15% above the calculated value. About 97% of measured points had less than 20% calculation-measurement difference and about 80% had less than 10%. The power peaking factor determined by this method consolidates also the calculations models. [es

  13. Analysis of psychological tests of the personnel employed at the RA research reactor

    International Nuclear Information System (INIS)

    Babic, S.

    1993-05-01

    The greatest nuclear accident in the history, the Chernobyl accident, had strong influence on international nuclear safety regulations. Though human error, as factor of risk, was never completely neglected but now it takes careful consideration, from design to man power. The situation in our country and results of psychological tests of occupational exposed persons in research reactor are discussed (author) [sr

  14. Optimum RA reactor fuelling scheme

    International Nuclear Information System (INIS)

    Strugar, P.; Nikolic, V.

    1965-10-01

    Ideal reactor refueling scheme can be achieved only by continuous fuel elements movement in the core, which is not possible, and thus approximations are applied. One of the possible approximations is discontinuous movement of fuel elements groups in radial direction. This enables higher burnup especially if axial exchange is possible. Analysis of refueling schemes in the RA reactor core and schemes with mixing the fresh and used fuel elements show that 30% higher burnup can be achieved by applying mixing, and even 40% if reactivity due to decrease in experimental space is taken into account. Up to now, mean burnup of 4400 MWd/t has been achieved, and the proposed fueling scheme with reduction of experimental space could achieve mean burnup of 6300 MWd/t which means about 25 Mwd/t per fuel channel [sr

  15. RA reactor operation and maintenance; Pogon i odrzavanje reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air.

  16. Nuclear Reactor RA Safety Report, Vol. 4, Reactor

    International Nuclear Information System (INIS)

    1986-11-01

    RA research reactor is thermal heavy water moderated and cooled reactor. Metal uranium 2% enriched fuel elements were used at the beginning of its operation. Since 1976, 80% enriched uranium oxide dispersed in aluminium fuel elements were gradually introduced into the core and are the only ones presently used. Reactor core is cylindrical, having diameter 40 cm and 123 cm high. Reaktor core is made up of 82 fuel elements in aluminium channels, lattice is square, lattice pitch 13 cm. Reactor vessel is cylindrical made of 8 mm thick aluminium, inside diameter 140 cm and 5.5 m high surrounded with neutron reflector and biological shield. There is no containment, the reactor building is playing the shielding role. Three pumps enable circulation of heavy water in the primary cooling circuit. Degradation of heavy water is prevented by helium cover gas. Control rods with cadmium regulate the reactor operation. There are eleven absorption rods, seven are used for long term reactivity compensation, two for automatic power regulation and two for safety shutdown. Total anti reactivity of the rods amounts to 24%. RA reactor is equipped with a number of experimental channels, 45 vertical (9 in the core), 34 in the graphite reflector and two in the water biological shield; and six horizontal channels regularly distributed in the core. This volume include detailed description of systems and components of the RA reactor, reactor core parameters, thermal hydraulics of the core, fuel elements, fuel elements handling equipment, fuel management, and experimental devices [sr

  17. Project RA Research nuclear reactor - Annual report 1993 with comparative review for the period 1991 - 1993; Projekat Istrazivacki nuklearni reaktor RA - Izvestaj za 1993. godinu, uz uporedni pregled za period 1991 - 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-15

    Research reactor RA Annual report for year 1993 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. First part includes 8 annexes describing reactor operation, activities of services for maintenance of reactor components and instrumentation, financial report and staffing. The ninth separate annex deals with the feasibility of RA reactor applications. Second part of the report is devoted to radiation protection issues and contains 4 annexes with data about radiation control of the working environment and reactor environment, description of decontamination activities, collection of radioactive wastes, and meteorology data. [Serbo-Croat] Godisnji izvestaj o radu nuklearnog reaktora RA za 1993. godinu sastoji se od dva dela: prvi deo obuhvata pogon i odzavanje reaktora RA, a drugi poslove zastite od zracenja na reaktoru RA. Prvi deo sadrzi 8 priloga, koji opisuju rad reaktora i poslove sluzbi za odrzavanje opreme i komponenti, finansijski izvestaj, kadrovsku strukturu osoblja reaktora. Poseban prilog razmatra mogucnosti koriscenja istrazivackog reaktora RA. Drugi deo izvestaja o poslovima zastite od zracenja sadrzi 4 priloga sa podacima radijacione kontrole radne sredine i okoline reaktora, opis poslova dekontaminacije i sakupljanja radioaktivnih materija, kao i meteoroloske podatke.

  18. Regulations for RA reactor operation; Propisi nuklearnog reaktora 'RA'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-09-15

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions. [Serbo-Croat] Propisi o radu nuklearnog reaktora RA pisani su tako da svi zakonski propisi definisani 'Zakonom o zastiti od jonizujuceg zracenja' i pratecim propisima (devet pravilnika) kao i tehnicke norme prema preporukama MAAE budu postovani u punoj meri pri radu reaktora. Sadrzaj ove knjige obuhvata: osnovne podatke o reaktoru; zakonske propise; organizaciju rada reaktora RA; opste propise o rezimu rada, kretanju u zgradi reaktora, izvodjenju eksperimenata; pogonske propise za rad u normalnom rezimu i u slucaju udesa.

  19. RA Research reactor Annual report 1981 - Part 1, Operation, maintenance and utilization of the RA reactor; Istrazivacki nuklearni reaktor RA, Deo 1 - Pogon, odrzavanje i eksploatacija reaktora u 1981. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Milosevic, M; Martinc, R; Kozomara-Maic, S; Cupac, S; Radivojevic, J; Stamenkovic, D; Skoric, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1981-12-15

    The RA nuclear reactor stopped operation after March 1979 campaign due to appearance of aluminium oxyhydrates deposits on the surface of fuel element claddings. Relevant decisions of the Sanitary inspection body of the Ministry of health and the Director General of the 'Boris Kidric' Institute of nuclear sciences, Vinca, banned further reactor operation until reasons caused aluminium oxyhydrates deposition are investigated and removed to enable regular reactor operation. Until the end of 1979 and during 1980, after a series of analyses and findings that caused cease of reactor operation, all the preparatory actions needed for restart were performed. Due to the fact that there is no emergency cooling system and no appropriate filtering system at the reactor, and according to the new regulations about start up of nuclear facilities, the Sanitary inspection body made a decision about temporary licence for reactor start-up meaning performance of the 'zero experiment' limiting the operating power to 1% of the nominal power. Accordingly the reactor was restarted on January 21 1981. Criticality was reached with the core made of 80% enriched fuel elements only. After the experiment was finished by the end of March a permission was demanded for operation at higher power levels at full power. Taking into account the state of the reactor components the operating licence was issued limiting the power to 2 MW until reconstruction of the ventilation system and construction of the emergency cooling system are fulfilled. Program of testing operation started on September 15 1981 increasing gradually the operating power. Thus the reactor was operated at 2 MW power for 15 days during November and December. The total production achieved in 1981 was 1698 MWh. This enabled isotopes production at the reactor during last two months. Control and maintenance of the reactor components and systems was done regularly and efficiently within limits imposed by availability of spare parts. The

  20. RA Research reactor Annual report 1982 - Part 1, Operation, maintenance and utilization of the RA reactor; Istrazivacki nuklearni reaktor RA - Deo 1 - Pogon, odrzavanje i eksploatacija nuklearnog reaktora RA u 1982. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Kozomara-Maic, S; Cupac, S; Radivojevic, J; Stamenkovic, D; Skoric, M; Miokovic, J [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1982-12-15

    Reactor test operation started in September 1981 at 2 MW power with 80% enriched fuel continued during 1982 according to the previous plan. The initial reactor core was made of 44 fuel channel each containing 10 fuel slugs. The first half of 1982 was used for the needed measurements and analysis of operating parameters and functioning of reactor systems and equipment under operating conditions. Program concerned with the testing operation at higher power levels was started in the second half of this year. It was found that the inherent excess reactivity and control rod worths ensure safe operation according to the IAEA safety standards. Excess reactivity is high enough to enable higher power level of 4.7 MW during 4 monthly cycles each lasting 15-20 days. Favourable conditions for cooling exist for the initial core configuration. Effects of poisoning at startup on the reactivity and power density distribution were measured as well as initial spatial distribution of the neutron flux which was 3,9 10{sup 13} cm{sup -2} s{sup -1} at 2 MW power. Modification of the calibration coefficient in the system for automated power level control was determined. All the results show that all the safety criteria and limitations concerned with fuel utilization are fulfilled if reactor power would be 4.7 MW. Additional testing operation at 3, 4, and 4.7 MW power levels will be needed after obtaining the licence for operating at nominal power. Transition from the initial core with 44 fuel channels to the equilibrium lattice configuration with 72 fuel channels each containing 10 fuel slugs, would be done gradually. Reactor was not operated in September because of the secondary coolant pipes were exchanged between Danube and the horizontal sedimentary. Control and maintenance of the reactor equipment was done regularly and efficiently dependent on the availability of the spare parts. Difficulties in maintenance of the reactor instrumentation were caused by unavailability of the

  1. Radiation protection at reactors RA and RB

    International Nuclear Information System (INIS)

    Ninkovic, M.

    2003-02-01

    Radiation protection activities at the RA and RB reactors are imposed by the existing legal regulations and international recommendations in this field. This annual report contains five parts which cover the following topics: Radiation safety, dosimetry control and technical radiation protection at reactors RA and RB; Handling of radioactive waste, actions and decontamination; Control of the environment (surroundings of RA and RB reactors) and meteorological measurements; Control of internal contamination and internal exposure; Health control od personnel exposed to radiation. Personnel as well as financial data are part of this report

  2. RA research nuclear reactor operation in forced regime, Annex 5; Prilog 5 - Rad istrazivackog nuklearnog reaktora RA u forsiranom rezimu, Prvo saopstenje

    Energy Technology Data Exchange (ETDEWEB)

    Mitrovic, S [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1964-12-15

    In order to increase the flux and experimental potentials of the RA reactor, properties of the reactor operating in the forced regime have been inspected four times, twice with the spent fuel (core C), and twice with partly fresh fuel (cores E and F). Forced regime means power higher than nominal 6.5 MW. From the analyses of technology parameters during operation in the forced regime at power levels of 7 and 11 MW, state and behaviour of the components, efficiency of the biological protection and other parameters it was concluded that the reactor operation is possible at power levels of 10 MW during a whole year, and under certain conditions even longer operation at power levels up to 15 MW. This paper examines the reactor operation conditions in the forced regime and gives conclusions related to real increase of the experimental possibilities, isotope production and economic factors. Radi povecanja fluksa i eksperimentalnih mogucnosti reaktora RA, cetiri puta su proverene osobine reaktora u forsiranom rezimu, tj. na snagama vecim od nominalne (6,5 MW) i to dva puta sa istrosenim gorivom (jezgro C) i dva puta sa delimicno svezim (jezgra E i F). Iz analize tehnoloskih parametara u toku eksperimentalno rada reaktora u forsiranom rezimu na snagama od 7 do 11 MW, stanja i ponasanja opreme, efikasnosti bioloske zastite i ostalih parametara, zakljucuje se da je moguc permanentan rad reaktora tokom cele godine na snagama do 10 MW, a pod izvesnim uslovima i duzi rad na snagama do 15 MW. U radu su diskutovani uslovi rada reaktora u forsiranom rezimu i donose se zakljucci o realnom povecanju eksperimentalnih mogucnosti, proizvodnje radioizotopa i o ekonomskim faktorima (author)

  3. Measurements for kinetic parameters estimation in the RA-0 research reactor

    International Nuclear Information System (INIS)

    Gomez, A; Bellino, P A

    2012-01-01

    In the present work, measurements based on the neutron noise technique and the inverse kinetic method were performed to estimate the different kinetic parameters of the reactor in its critical state. By means of the neutron noise technique, we obtained the current calibration factor of the ionization chamber M6 belonging to the power range channels of the reactor instrumentation. The maximum current allowed compatible with the maximum power authorized by the operation license was also obtained. Using the neutron noise technique, the reduced mean reproduction time (Λ*) was estimated. This parameter plays a fundamental role in the deterministic analysis of criticality accidents. Comparison with previous values justified performing new measurements to study systematic trends in the value of Λ*. Using the inverse kinetics method, the reactivity worth of the control rods was estimated, confirming the existence of spatial effects and trends previously observed (author)

  4. Communications programme for the RA nuclear reactor decommission

    International Nuclear Information System (INIS)

    Milanovic, S.; Antic, D.

    2002-01-01

    During the decommissioning of the RA research nuclear reactor at the VINCA Institute of Nuclear Sciences, an adequate number of radiation and contamination surveys should be conduced to assure radiological safety of the workers, the public and the environment. Public would like to know more about the nuclear and radiological safety. The communications programme defines the ways to informing the public, its representatives and the information media about the health and safety aspects of the activities during the RA nuclear reactor decommission. (author)

  5. Chemical dosimetry at the RA reactor; Hemijska dozimetrija reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Gal, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    This report presents the results of measurements of absorbed doses axial and radial distribution in the vertical experimental channels of the RA reactor. Measurements were done in channels VK-5, VK-7, VK-9 and GF-36. Results were compared to the results of calorimetry measurements and measured neutron flux values performed by other laboratories. Fricke and oxalate dosemeters were used in addition to the cobalt indicators.

  6. Research nuclear reactor RA - Annual Report 1995, with comparative review for period 1991-1995; Istrazivacki nuklearni reaktor RA - Izvestaj za 1995. godinu, uz uporedni pregled za period 1991-1995

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1995-12-01

    Activities related to revitalisation of the RA reactor started in 1986, were continued during period 1991-1995. All the planned actions related to renewal of the reactor components were finished. The last, and at the same time most important action, related to exchange of complete reactor instrumentation is underway, delayed. The delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. The existing RA reactor instrumentation was dismantled. Control and maintenance of the reactor components was done regularly and efficiently. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 47 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. The problem of financing the reactor activities and maintenance remains unsolved during the period 1991-1995. This research reactor RA Annual is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] U periodu 1991-1995. godina nastavljeni su poslovi na revitalizaciji reaktora RA, zapocetoj 1986. godine. Okoncan je niz zahvata na opremi postrojenja kojima ce se u narednom periodu omoguciti kontinualan i pouzdan rad ovog reaktora. Poslednji, i ujedno najveci zahvat, koji se odnosi na zamenu celokupne instrumentacije kasni zbog zastoja u isporuci opreme koja se izradjuje u Sovjetskom savezu. Izradu ove opreme finansira Medjunarodna agencija za atomsku energiju kroz ugovor sklopljen decembra 1988. godine sa moskovskom

  7. RA-0 reactor. New neutronic calculations

    International Nuclear Information System (INIS)

    Rumis, D.; Leszczynski, F.

    1990-01-01

    An updating of the neutronic calculations performed at the RA-0 reactor, located at the Natural, Physical and Exact Sciences Faculty of Cordoba National University, are herein described. The techniques used for the calculation of a reactor like the RA-0 allows prediction in detail of the flux behaviour in the core's interior and in the reflector, which will be helpful for experiments design. In particular, the use of WIMSD4 code to make calculations on the reactor implies a novelty in the possible applications of this code to solve the problems that arise in practice. (Author) [es

  8. Research reactors in Argentina

    International Nuclear Information System (INIS)

    Carlos Ruben Calabrese

    1999-01-01

    Argentine Nuclear Development started in early fifties. In 1957, it was decided to built the first a research reactor. RA-1 reactor (120 kw, today licensed to work at 40 kW) started operation in January 1958. Originally RA-1 was an Argonaut (American design) reactor. In early sixties, the RA-1 core was changed. Fuel rods (20% enrichment) was introduced instead the old Argonaut core design. For that reason, a critical facility named RA-0 was built. After that, the RA-3 project started, to build a multipurpose 5 MW nuclear reactor MTR pool type, to produce radioisotopes and research. For that reason and to define the characteristics of the RA-3 core, another critical facility was built, RA-2. Initially RA-3 was a 90 % enriched fuel reactor, and started operation in 1967. When Atucha I NPP project started, a German design Power Reactor, a small homogeneous reactor was donated by the German Government to Argentina (1969). This was RA-4 reactor (20% enrichment, 1W). In 1982, RA-6 pool reactor achieved criticality. This is a 500 kW reactor with 90% enriched MTR fuel elements. In 1990, RA-3 started to operate fueled by 20% enriched fuel. In 1997, the RA-8 (multipurpose critical facility located at Pilcaniyeu) started to operate. RA-3 reactor is the most important CNEA reactor for Argentine Research Reactors development. It is the first in a succession of Argentine MTR reactors built by CNEA (and INVAP SE ) in Argentina and other countries: RA-6 (500 kW, Bariloche-Argentina), RP-10 (10MW, Peru), NUR (500 kW, Algeria), MPR (22 MW, Egypt). The experience of Argentinian industry permits to compete with foreign developed countries as supplier of research reactors. Today, CNEA has six research reactors whose activities have a range from education and promotion of nuclear activity, to radioisotope production. For more than forty years, Argentine Research Reactors are working. The experience of Argentine is important, and argentine firms are able to compete in the design and

  9. Measurements of neutron flux in the RA reactor

    International Nuclear Information System (INIS)

    Raisic, N.

    1961-12-01

    This report includes the following separate parts: Thermal neutron flux in the experimental channels od RA reactor; Epithermal neutron flux in the experimental channels od RA reactor; Fast neutron flux in the experimental channels od RA reactor; Thermal neutron flux in the thermal column and biological experimental channel; Neutronic measurements in the RA reactor cell; Temperature reactivity coefficient of the RA reactor; design of the device for measuring the activity of wire [sr

  10. RA reactor building and installations; Zgrada 'RA' i instalacije

    Energy Technology Data Exchange (ETDEWEB)

    Badrljica, R; Sanovic, V; Skoric, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1985-08-15

    RA reactor building is made of reinforced concrete and bricks. It is closed facility with a limited number of controlled openings, doors and windows. The site of the building is 100 m above the sea level, 20 m above the mean Danube level and 8 m above the level of the neighbouring stream Mlaka. The building consists of three parts: central prismatic part, annex - surrounding the central part and the sanitary corridor. The biggest space is the reactor hall. In addition to the detailed description and drawings of the reactor building this documents includes design specifications of: electrical installation, water supply system, sewage system, ventilation and heating, gas and compressed air systems. A separate chapter is devoted to fire protection. Zgrada reaktora RA izgradjena je od armiranog betona i opeke, kao zatvoreni objekat ogranicenog broja kontolisanih otvora, sa ogranicenim brojem vrata i prozora. Plato na kojem je zgrada izgradjena nalazi se na 100 m nadmorske visine, na 20 m iznad srednjeg vodostaja Dunava i 8 m iznad nivoa obliznjeg potoka Mlaka. Zgrada se sastoji iz tri dela: sredisnjeg prizmaticnog dela, aneksa - prstenastog okvira sredisnog dela i sanitarnog propusnika. Pojedinacno najveci prostor zauzima reaktorska hala. Pored detaljnog opisa i plana zgrade, ovaj dokument sadrzi projekat elektricne instalacije, projekat vodovoda i kanalizacije, ventilacije i grejanja, instalacije gasa i komprimovanog vazduha. Posebno poglavlje posveceno je protivpozarnoj zastiti.

  11. Radiation protection at the RA Reactor in 1998, RA reactor annual report, Part -2

    International Nuclear Information System (INIS)

    Ninkovic, M.; Pavlovic, R.; Mandic, M.; Pavlovic, S.; Grsic, Z.

    1998-01-01

    Radiation protection tasks which enable safe operation of the RA reactor, and are defined according the the legal regulations and IAEA safety recommendations are sorted into four categories in this report: (1) Control of the working environment, dosimetry at the RA reactor; (2) Radioactivity control in the vicinity of the reactor and meteorology measurements; (3) Collecting and treatment of fluid effluents; and (4) radioactive wastes, decontamination and actions. Each of the category is described as a separate annex of this report [sr

  12. Radiation protection at the RA Reactor in 1988, Part -2, RA reactor annual report

    International Nuclear Information System (INIS)

    Ninkovic, M.; Ajdacic, N.; Zaric, M.; Vukovic, Z.

    1988-01-01

    Radiation protection tasks which enable safe operation of the RA reactor, and are defined according the the legal regulations and IAEA safety recommendations are sorted into four categories in this report: (1) Control of the working environment, dosimetry at the RA reactor and radiation protection; (2) Radioactivity control in the vicinity of the reactor and meteorology measurements; (3) Decontamination and relevant actions, collecting and treatment of fluid effluents; and and solid radioactive wastes [sr

  13. Waste Management During RA Reactor Decommissioning

    International Nuclear Information System (INIS)

    Markovic, M.; Avramovic, I.

    2008-01-01

    The objective of radioactive waste management during the RA reactor decommissioning is to deal with radioactive waste in a manner that protects human health and the environment now and in the future. The estimation of waste quantities to be expected during decommissioning is a very important step in the initial planning. (author)

  14. Regulations and instructions for RA reactor operation

    International Nuclear Information System (INIS)

    1989-01-01

    This regulatory guide consists of following 4 chapters: Description of the RA reactor, organization scheme, regulations for performing experiments; Regulations for staff on duty; Instructions for operating the vacuum systems, heavy water and helium systems; and evacuation in case of accident [sr

  15. Measurements of neutron flux in the RA reactor; Merenje karakteristika neutronskog fluksa u reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    This report includes the following separate parts: Thermal neutron flux in the experimental channels od RA reactor; Epithermal neutron flux in the experimental channels od RA reactor; Fast neutron flux in the experimental channels od RA reactor; Thermal neutron flux in the thermal column and biological experimental channel; Neutronic measurements in the RA reactor cell; Temperature reactivity coefficient of the RA reactor; design of the device for measuring the activity of wire. [Serbo-Croat] Ovaj izvestaj sadrzi sledece referate: Fluks termalnih neutrona u eksperimentalnim kanalima reaktora RA; Fluks epitermalnih neutrona u eksperimentalnim kanalima reaktora RA; Fluks brzih neutrona u eksperimentalnim kanalima reaktora RA; Fluks termalnih neurona u termalnoj koloni i bioloskom eksperimentalnom kanalu; Neutronska merenja u elementarnoj celiji reaktora RA; Temperaturni koeficijent reaktivnosti reaktora RA; Projekat uredjaja za merenje radioaktivnosti zice.

  16. Possibilities for power reactor structural material and fuel testing in reactor RA; Mogucnosti reaktora RA za testiranje konstrukcionih materijala i goriva energetskih reaktora

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Lazarevic, Dj; Stefanovic, D; Cupac, S; Pesic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1978-05-15

    Nuclear reactor RA at Vinca has been designed as a high flux general purpose research reactor. Among other it was intended to play a role of material testing reactor. A scope of activities of Material Laboratory and Reactor RA Department of Boris Kidric Institute is presented in this report. Reactor RA capacity for reactor structural material and fuel irradiation is also described. The increase of RA reactor irradiation capacity is based on the improvement of VISA type fuel channel for fast neutron irradiations, as well as on the general neutron flux increase, due to introduction of highly enriched uranium fuel into reactor core and the advanced in-core fuel management. The irradiation capacities described allow for the reactor material and fuel testing to the considerable extent. Istrazivacki reaktor RA u Vinci je projektovan kao visokofluksni istrazivacki reaktor opste namene. Pored ostalog, on je namenjen i za testiranje reaktorskih konstrukcionih materijala i goriva. U radu je dat pregled aktivnosti Laboratorije za materijale IBK i reaktora RA na tom podrucju, kao i opis povecanih mogucnosti reaktora RA za ozracivanje reaktorskih materijala i goriva u cilju njihovog testiranja. Povecanje mogucnosti reaktora RA zasniva se na usavrsavanju specijalnog gorivnog kanala tipa VISA (za ozracivanje materijala brzim neutronima), kao i na opstem povecanju neutronskog fluksa na osnovu uvodjenja i nacina koriscenja visokoobogacenog uranskog goriva u reaktoru RA. Opisane mogucnosti reaktora RA dozvoljavaju u znatnoj meri ispitivanje konstrukcionih materijala i goriva energetskih reaktora.

  17. Study on the technical feasibility of Fission-Track dating at two irradiation positions of the RA-6 research reactor

    International Nuclear Information System (INIS)

    Dorval, Eric

    2005-01-01

    The method of Fission-Track dating is based upon the detection of the damage caused by fission fragments from the Uranium contained in geological samples.In order to determine the age of a sample, both the amount of spontaneous fissions occurred and the Uranium concentration must be known.The latter requires the irradiation of the samples inside a reactor with a well-thermalized flux, so that fissions are induced over 235 U targets only. Therefore, the Uranium concentration may be determined.The main inconvenient presented by the irradiation sites at the RA-6 MTR-type reactor is that neutron flux is not completely thermal there, which means that fissions due to epithermal and fast neutrons will not be negligible.In the same way, tracks due to fissions of 238 U and 232 Th will be detected. In order to know the corrections that must be applied to those measurements performed in this reactor, it is necessary to characterize fast flux.Because of it, this laboratory's gamma spectrometry equipment had to be calibrated. After that, several activation detectors were irradiated and results were analyzed. Finally, it was determined that it is feasible to Fission-Track date at the I6 position. However, limitations associated to this method were analyzed for the values of flux measured in the different sites

  18. RA Reactor operation and maintenance (I-IX), Part IV, Task 3.08/04, Refurbishment of the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    This volume contains reports describing maintenance and repair work of the RA reactor instrumentation, equipment of the reactor dosimetry control system, and equipment for regulation and control systems

  19. Implementation of a reactivity meter for the RA-6 reactor

    International Nuclear Information System (INIS)

    Herzovich, P.F.

    1991-06-01

    An 'on line' and 'off line' digital reactivity meter was developed and implemented for the RA-6 research reactor. Safety and control rod calibration will be permitted by means of this system with the same precision and faster than the period method, becoming a helpful tool to the operator in critical approach and in experimental design. (Author) [es

  20. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Tanaskovic, M.

    1992-01-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems [sr

  1. RA-0 reactor. New neutronic calculations; Reactor RA-0. Nuevos calculos neutronicos

    Energy Technology Data Exchange (ETDEWEB)

    Rumis, D; Leszczynski, F

    1991-12-31

    An updating of the neutronic calculations performed at the RA-0 reactor, located at the Natural, Physical and Exact Sciences Faculty of Cordoba National University, are herein described. The techniques used for the calculation of a reactor like the RA-0 allows prediction in detail of the flux behaviour in the core`s interior and in the reflector, which will be helpful for experiments design. In particular, the use of WIMSD4 code to make calculations on the reactor implies a novelty in the possible applications of this code to solve the problems that arise in practice. (Author). [Espanol] En este trabajo se actualizan los calculos neutronicos realizados para el reactor RA-0, instalado en la Facultad de Ciencias Exactas, Fisicas y Naturales de la Universidad Nacional de Cordoba. Se describen los calculos realizados hasta la fecha y los resultados obtenidos. Las tecnicas incorporadas al calculo de un reactor como el RA-0 permiten predecir en detalle el comportamiento del flujo en el interior del nucleo y en el reflector, lo que sera una importante ayuda en el diseno de experimentos. En particular, el empleo del codigo WIMSD4 para calculos del reactor completo constituye una novedad en las posibles aplicaciones de ese codigo para resolver problemas que se presentan en la practica. (Autor).

  2. Future prospects of reactor Ra at VINCA institute

    International Nuclear Information System (INIS)

    Davidovic, M.; Babic-Stojic, B.; Dobrijevic, R.

    1997-01-01

    Reactor RA at Nuclear Research Institute Vinca belongs to a group of the medium thermal neutron flux reactors, according to classification at end of nineties. At the beginning reactor RA has been used as a powerful source of neutrons and gamma-quanta for various experiments (interaction of neutrons and gamma-quanta with materials) and for production of artificial radioactive materials for commercial use. Very successful utilization of this neutron spectrum has been in its use for structural studies of crystal materials and liquid metals, for magnetic structure studies of various magnetic materials, as well as, dynamic properties of ferro magnetics, ferroelectrics, etc. This kind of spectrometers still exist at reactor RA and with an improved detection system could be used again if reactor starts functioning. Besides this, a part of activity was devoted to construction of neutron guide tubes for thermal neutrons and this could also be accomplished relatively easy in the future. A part of the activities of the reactor should in the future be devoted to the training of students in the field of solid state physics and nuclear physics. Particular attention will be paid to the use of established technologies in production of radioactive isotopes and a new class of isotopes for custom use will be developed as well as highly commercial and prospective products (silicon doping, radiography, etc.). (author)

  3. RA Research nuclear reactor, Part 1, RA reactor operation and maintenance in 1993, with comparative review for the period 1991 - 1993, Annex 3; Projekat Istrazivacki nuklearni reaktor RA - 1 Deo Pogon i odrzavanje nuklearnog reaktora RA u 1993. godini, uz uporedni pregled za period 1991 - 1993. - prilog 3

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Mikic, N; Tanaskovic, M [Vinca Institute of Nuclear Sciences, Beograd (Serbia and Montenegro)

    1993-12-15

    RA reactor was not operated during 1993 because of the complete instrumentation exchange. Although it has been planned to exchange the complete instrumentation until the end of 1993, and to start reactor operation in the first half of 1993 this was not fulfilled because the instrumentation was not delivered until the end of 1993. Main activities during past seven years were related to construction of the emergency cooling system; repair and reconstruction of the system for handling the spent fuel and improvement of spent fuel storage conditions; exchange of the aged instrumentation. Other reactor components and systems, reactor core, primary coolant loop and gas circulation system are in good condition concerning future start-up. [Serbo-Croat] U 1993. godini reaktor nije bio u pogonu zbog zamene njegove celokupne instrumentacije. Iako je bilo planirano da se celokupna instrumentacija zameni do kraja 1993. te da reaktor pocne sa radom u prvoj polovini 1993. Ovo nije ispunjeno jer celokupna oprema nije isporucena ni do kraja 1993. godine. Osnovni zahvati koji su u proteklih sedma godina izvrseni, odnosili su se na izgradnju sistema za udesno hladjenje, rekonstrukciju sistema za rukovanje ozracenim gorivom i poboljsanje uslova za stokiranje ovog goriva, zamenu instrumentacije. Ostali sistemi reaktora, reaktorsko jezgro, primarno kolo hladjenja i sistem za cirkulaciju gasa su u dobrom stanju i mogu se nesmetano koristiti u buducem radu.

  4. RA Reactor operation and maintenance (I-IX), Part I

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    The report on RA reactor operation and maintenance for year 1963 is divided in six tasks. This volume contains the introductory report, and three tasks of the final report, namely reactor exploitation, reactivity changes of the RA reactor before repair, planning of refuelling

  5. Measurements of neutron flux in the RA reactor; Merenje karakteristika neutronskog fluksa u reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    This report includes results of the following measurements performed at the RA reactor: thermal neutron flux in the experimental channels, epithermal and fast neutron flux, neutron flux in the biological shield, neutron flux distribution in the reactor cell.

  6. Kinetic parameters of the RB and RA reactors

    Energy Technology Data Exchange (ETDEWEB)

    Petrovic, M; Obradovic, D [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1965-12-15

    In the paper the expressions for transfer functions of the zero power reactors, as well as power reactors of the RA reactor type are given, based on the space independent model. The modulation method for reactor transfer function measurements is explained. The results of the measurement and interpretation are given. The measurement were done on the RB and RA reactors in 'Boris Kidrich' Institute for Nuclear Sciences in Vincha (author)

  7. Characterization of the neutron flow for the implementation of an experimental analysis installation for rapid gamma activation in the Argentine Research Reactor RA-6

    International Nuclear Information System (INIS)

    Henriquez, C.; Gennuso, G.

    2000-01-01

    This is the final work to obtain a Diploma on Specialization in Application of Nuclear Technological Energy, carried out at the Research Reactor RA-6, from March to December 1999. Different work has been realized on the Tangential Tube N of the 500 KW Argentine RA-6 research reactor, in order to add a new technique to the present existing analytical methods. This Prompt Gamma Neutron Activation Analysis technique (PGNAA) requires a beam of collimated thermal neutrons, a lowest possible gamma radiation, and a thermal component of the biggest possible cadmium rate. It also must have a high resolution detection system for the measurement of the gamma radiation emitted after the capture of the neutron produced in the study sample. Continuing with the facility's technical requirements, a collimator was installed inside the N passing tube, in order to concentrate the neutrons coming from the nuclear core and also to compensate possible losses during the path. This collimator is 440mm long and 200 mm in diameter and consists of lead and steel cylinders with different size holes on the inside, so that it can deliver a 50 mm diameter beam of thermal collimated neutrons. Two 100 mm thick bismuth filters are inside the passing tube, to reduce the gamma component inside de beam, coming from the reactor core. This work aims to the characterization of the thermal and epithermal component of the neutron beam in the collimator and at the exit of it , and also to prove experimentally that the collimator achieves the technical specifications for which it was designed and built, specifically by verifying its functioning (degree of convergence of the beam obtained). On the other hand, it is necessary to learn about the PGNAA technique in order to define the technical requirements for its adequate operation. (author)

  8. Operation and maintenance of the RA reactor in 1964, I-II, Part II; Pogon i odrzavanje reaktora RA u 1964. godini, I-II, II Deo

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1964-12-15

    This volume of the report contains the following 15 Annexes: Improvement of the fuel cycle economy (record No. 37009803 in INIS DB); Analysis of neutron flux increase in horizontal experimental channels of the RA reactor record No. 37005698 in INIS DB); Application of the critical system for determining the thermal neutron flux in a research reactor with central horizontal reflector ( record No. 37055005 in INIS DB); Determining the capacity of the RA reactor heat exchanger dependent on the coolant water temperature and flow; Operation of the RA reactor in forced regime; Analysis of the CEN-132 heavy water pumps failures at the RA reactor from decontamination till present; Modifications in the vacuum loop of the distillation system; Report on decontamination of the evaporator and cleaning of the condenser of the distillation system; Operation of reactor at nominal power with reduced D{sub 2}O circulation; Cooling of the RA reactor with reduced flow rate in the heavy water loop; Measurement of the heavy water level in the fuel channels of the RA reactor; Conclusions of the experts group of the RA reactor at the meeting held on November 2 and 3 1964; Conclusions of the experts group at the meeting held on November 23 1964; After heat and the cooling problem after RA reactor shut-down; Measurement of noise and vibrations on the Ra reactor heavy water system; Calculation and measurement of the uranium temperature during irradiation in the experimental channel in the reflector of the RA reactor; Temperature measurement of the reactor materials samples irradiated in the fuel channels of the RA reactor; Study of the modifications in the synchronous generators, heavy water pumps and condenser batteries of the RA reactor.

  9. Reproduction of the RA reactor fuel element fabrication; Reprodukcija izrade gorivnog elementa za reaktor RA

    Energy Technology Data Exchange (ETDEWEB)

    Novakovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    This document includes the following nine reports: Final report on task 08/12 - testing the Ra reactor fuel element; design concept for fabrication of RA reactor fuel element; investigation of the microstructure of the Ra reactor fuel element; Final report on task 08/13 producing binary alloys with Al, Mo, Zr, Nb and B additions; fabrication of U-Al alloy; final report on tasks 08/14 and 08/16; final report on task 08/32 diffusion bond between the fuel and the cladding of the Ra reactor fuel element; Final report on task 08/33, fabrication of the RA reactor fuel element cladding; and final report on task 08/36, diffusion of solid state metals. Ovaj rad sadrzi devet priloga: 1. Zavrsni izvestaj o podzadatku 08/12, ispitivanje elementa goriva reaktora RA; 2. Koncepcija izrade gorivnog elementa reaktora RA; 3. Ispitivanje mikrostrukture gorivnog elementa reaktora RA; 4. Zavrsni izvestaj o podzadatku 08/13, dobijanje binarnih legura urana sa legirajucim komponentama Al, Mo, Zr, Nb i B; 5. Dobijanje legure U-Al; 6. Zavrsni izvestaj o podzadacima 08/14 i 08/16; 7. Zavrsni izvestaj o podzadatku 08/32, difuziona veza goriva i kosuljice gorivnog elementa reaktora RA; 8. Zavrsni izvestaj o podzadatku 08/33, izrada kosuljice gorivnog elementa reaktora RA; 9. Zavrsni izvestaj o podzadatku 08/36, difuzija kod metala u cvrstom stanju.

  10. Measurements at the RA Reactor related to the VISA-2 project - Part 1, Start-up of the RA reactor and measurement of new RA reactor core parameters

    International Nuclear Information System (INIS)

    Markovic, H.

    1962-07-01

    The objective of the measurements was determining the neutron flux in the RA reactor core. Since the number of fuel channels is increased from 56 to 68 within the VISA-2 project, it was necessary to attain criticality of the RA reactor and measure the neutron flux properties. The 'program of RA reactor start-up' has been prepared separately and it is included in this report. Measurements were divided in two phases. First phase was measuring of the neutron flux after the criticality was achieved but at zero power. During phase two measurements were repeated at several power levels, at equilibrium xenon poisoning. This report includes experimental data of flux distributions and absolute values of the thermal and fast neutron flux in the RA reactor experimental channels and values of cadmium ratio for determining the neutron epithermal flux. Data related to calibration of regulatory rods for cold un poisoned core are included [sr

  11. Reproduction of the RA reactor fuel element fabrication

    International Nuclear Information System (INIS)

    Novakovic, M.

    1961-12-01

    This document includes the following nine reports: Final report on task 08/12 - testing the Ra reactor fuel element; design concept for fabrication of RA reactor fuel element; investigation of the microstructure of the Ra reactor fuel element; Final report on task 08/13 producing binary alloys with Al, Mo, Zr, Nb and B additions; fabrication of U-Al alloy; final report on tasks 08/14 and 08/16; final report on task 08/32 diffusion bond between the fuel and the cladding of the Ra reactor fuel element; Final report on task 08/33, fabrication of the RA reactor fuel element cladding; and final report on task 08/36, diffusion of solid state metals [sr

  12. RA reactor operation and maintenance in 1996, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1996-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. Since the RA reactor is shutdown since 1984, it is high time for decision making of its future status. Possible solutions for the future status of the RA reactor discussed in this report are: renewal of reactor components for the reactor restart, conservation of the reactor (temporary shutdown) or permanent reactor shutdown. Control and maintenance of the reactor instrumentation and devices was done regularly but dependent on the availability of the spare parts and financial means. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  13. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities

  14. RA Reactor operation and maintenance (I-IX), Part IV, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora RA (I-IX), IV Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume contains reports describing maintenance and repair work of the RA reactor instrumentation, equipment of the reactor dosimetry control system, and equipment for regulation and control systems.

  15. Research reactors

    International Nuclear Information System (INIS)

    Merchie, Francois

    2015-10-01

    This article proposes an overview of research reactors, i.e. nuclear reactors of less than 100 MW. Generally, these reactors are used as neutron generators for basic research in matter sciences and for technological research as a support to power reactors. The author proposes an overview of the general design of research reactors in terms of core size, of number of fissions, of neutron flow, of neutron space distribution. He outlines that this design is a compromise between a compact enough core, a sufficient experiment volume, and high enough power densities without affecting neutron performance or its experimental use. The author evokes the safety framework (same regulations as for power reactors, more constraining measures after Fukushima, international bodies). He presents the main characteristics and operation of the two families which represent almost all research reactors; firstly, heavy water reactors (photos, drawings and figures illustrate different examples); and secondly light water moderated and cooled reactors with a distinction between open core pool reactors like Melusine and Triton, pool reactors with containment, experimental fast breeder reactors (Rapsodie, the Russian BOR 60, the Chinese CEFR). The author describes the main uses of research reactors: basic research, applied and technological research, safety tests, production of radio-isotopes for medicine and industry, analysis of elements present under the form of traces at very low concentrations, non destructive testing, doping of silicon mono-crystalline ingots. The author then discusses the relationship between research reactors and non proliferation, and finally evokes perspectives (decrease of the number of research reactors in the world, the Jules Horowitz project)

  16. Research reactors

    International Nuclear Information System (INIS)

    Kowarski, L.

    1955-01-01

    It brings together the techniques data which are involved in the discussion about the utility for a research institute to acquire an atomic reactor for research purposes. This type of decision are often taken by non-specialist people who can need a brief presentation of a research reactor and its possibilities in term of research before asking advises to experts. In a first part, it draws up a list of the different research programs which can be studied by getting a research reactor. First of all is the reactor behaviour and kinetics studies (reproducibility factor, exploration of neutron density, effect of reactor structure, effect of material irradiation...). Physical studies includes study of the behaviour of the control system, studies of neutron resonance phenomena and study of the fission process for example. Chemical studies involves the study of manipulation and control of hot material, characterisation of nuclear species produced in the reactor and chemical effects of irradiation on chemical properties and reactions. Biology and medicine research involves studies of irradiation on man and animals, genetics research, food or medical tools sterilization and neutron beams effect on tumour for example. A large number of other subjects can be studied in a reactor research as reactor construction material research, fabrication of radioactive sources for radiographic techniques or applied research as in agriculture or electronic. The second part discussed the technological considerations when choosing the reactor type. The technological factors, which are considered for its choice, are the power of the reactor, the nature of the fuel which is used, the type of moderator (water, heavy water, graphite or BeO) and the reflector, the type of coolants, the protection shield and the control systems. In the third part, it described the characteristics (place of installation, type of combustible and comments) and performance (power, neutron flux ) of already existing

  17. Nuclear Reactor RA Safety Report, Vol. 14, Safety protection measures

    International Nuclear Information System (INIS)

    1986-11-01

    Nuclear reactor accidents can be caused by three type of errors: failure of reactor components including (1) control and measuring instrumentation, (2) errors in operation procedure, (3) natural disasters. Safety during reactor operation are secured during its design and construction and later during operation. Both construction and administrative procedures are applied to attain safe operation. Technical safety features include fission product barriers, fuel elements cladding, primary reactor components (reactor vessel, primary cooling pipes, heat exchanger in the pump), reactor building. Safety system is the system for safe reactor shutdown and auxiliary safety system. RA reactor operating regulations and instructions are administrative acts applied to avoid possible human error caused accidents [sr

  18. Measurement of transient hydrodynamic characteristics of the reactor RA primary cooling system

    International Nuclear Information System (INIS)

    Jovic, L.; Majstorovic, D.; Zeljkovic, I.

    1987-01-01

    Experimental study of transient hydrodynamic characteristics of the research nuclear reactor RA by simultaneous measurements of fluid flow and pressure on several locations of the RA primary coolant system is done. Loss of electric power transient on the main circulation pumps is simulated. measurement methodology, data processing and results of measured data analysis are given. (author)

  19. Nuclear Reactor RA Safety Report, Vol. 8, Auxiliary system

    International Nuclear Information System (INIS)

    1986-11-01

    This volume describes RA reactor auxiliary systems, as follows: special ventilation system, special drainage system, hot cells, systems for internal transport. Ventilation system is considered as part of the reactor safety and protection system. Its role is eliminate possible radioactive particles dispersion in the environment. Special drainage system includes pipes and reservoirs with the safety role, meaning absorption or storage of possible radioactive waste water from the reactor building. Hot cells existing in the RA reactor building are designed for production of sealed radioactive sources, including packaging and transport [sr

  20. Preparations for the shipment of RA-3 reactor irradiated fuel

    International Nuclear Information System (INIS)

    Goldschmidt, Adrian; Novara, Oscar; Lafuente, Jose

    2002-01-01

    During the last quarter of 2000, in the Radioactive Waste Management Area of the Argentine National Commission of Atomic Energy (CNEA), located at Ezeiza Atomic Center (CAE), activities associated to the shipment of 207 MTR spent fuels containing high enrichment uranium were carried out within the Foreign Research Reactor/Domestic Research Reactor Receipt Program launched by the US Department of Energy (DOE). The MTR spent fuel shipped to Savannah River Site (SRS) was fabricated in Argentina with 90% enriched uranium of US origin and it was utilized in the operation of the research and radioisotope production reactor RA-3 from 1968 until 1987. After a cooling period at the reactor, the spent fuel was transferred to the Central Storage Facility (CSF) located in the waste management area of CAE for interim storage. The spent fuel (SF) inventory consisted of 166 standard assemblies (SA) and 41 control assemblies (CA). Basically, the activities performed were the fuel conditioning operations inside the storage facility (remote transference of the assemblies to the operation pool, fuel cropping, fuel re-identification, loading in transport baskets, etc.) conducted by CNEA. The loading of the filled baskets in the transport casks (NAC-LWT) by means of intermediate transfer systems and loaded casks final preparations were conducted by NAC personnel (DOE's contractor) with the support of CNEA personnel. (author)

  1. RA reactor exploitation, task 3.08/01; Zadatak 3.08/01 - Eksploatacija reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During 1963 the RA reactor was operated for 1852 hours at mean power of 5.7 MW (total power production was 10716 MWh). Reactor was used for irradiation according to the demand of 356 users, and 15 experiments. The reason for decreased operation in comparison with the previous year was repair of all the reactor equipment and decontamination of the heavy water system. This report contains detailed data about reactor power, reactivity changes and fuel burnup. Mean monthly usage of the reactor experimental channels as well as samples which were irradiated are part of this report.

  2. Removal of spent fuel from the TVR reactor for reprocessing and proposals for the RA reactor spent fuel handling

    International Nuclear Information System (INIS)

    Volkov, E.B.; Konev, V.N.; Shvedov, O.V.; Bulkin, S.Yu; Sokolov, A.V.

    2002-01-01

    The 2,5 MW heavy-water moderated and cooled research reactor TVR was located at the Moscow Institute for Theoretical and Experimental Physics site. In 1990 the final batch of spent nuclear fuel (SNF) from the TVR reactor was transported for reprocessing to Production Association (PA) 'Mayak'. This transportation of the SNF was a part of TVR reactor decommissioning. The special technology and equipment was developed in order to fulfill the preparation of TVR SNF for transportation. The design of the TVR reactor and the fuel elements used are similar to the design and fuel elements of the RA reactor. Two different ways of RA spent fuel elements for transportation to reprocessing plant are considered: in aluminum barrels, and in additional cans. The experience and equipment used for the preparing TVR fuel elements for transportation can help the staff of RA reactor to find the optimal way for these technical operations. (author)

  3. Safety analysis of RA reactor operation, I-II, Part I - RA reactor technical and operation characteristics; Analiza sigurnosti rada reaktora RA - I-III, I deo - Tehnicke i pogonske karakteristike reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    RA research reactor is a thermal, heavy water moderated system with graphite reflector having nominal power 6.5 MW. The 2% enriched metal uranium fuel in the reactor core produces mean thermal neutron flux of 2.9 10{sup 13} neutrons/cm{sup 2} s, and maximum neutron flux 5.5 10{sup 13} neutrons/cm{sup 2} s. main components of the reactor described in this report are: rector core, reflector, biological shield, heavy water cooling system, ordinary water cooling system, helium system, reactor control system, reactor safety system, dosimetry system, power supply system, and fuel transport system. Detailed reactor properties and engineering drawings of all the system are part of this volume.

  4. Nuclear Reactor RA Safety Report, Vol. 13, Causes of possible accidents

    International Nuclear Information System (INIS)

    1986-11-01

    This volume includes the analysis of possible accidents on the RA research reaktor. Any unwanted action causing decrease of integrity of any of the reactor safety barriers is considered to be a reactor accident. Safety barriers are: fuel element cladding, reactor vessel, biogical shield, and reactor building. Reactor accidents can be classified in four categories: (1) accidents caused by reactivity changes; (2) accidents caused by mis function of the cooling system; (3) accidents caused by errors in fuel management and auxiliary systems; (4) accidents caused by natural or other external disasters. The analysis of possible causes of reactor accidents includes the analysis of possible impacts on the reactor itself and the environment [sr

  5. RA reactor operation and maintenance in 1994, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1994-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. The spent fuel elements used from the very beginning of reactor operation are stored in the existing pools. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988 and was fulfilled in 1990. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  6. RA reactor exploitation, task 3.08/01

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-01-01

    During 1963 the RA reactor was operated for 1852 hours at mean power of 5.7 MW (total power production was 10716 MWh). Reactor was used for irradiation according to the demand of 356 users, and 15 experiments. The reason for decreased operation in comparison with the previous year was repair of all the reactor equipment and decontamination of the heavy water system. This report contains detailed data about reactor power, reactivity changes and fuel burnup. Mean monthly usage of the reactor experimental channels as well as samples which were irradiated are part of this report

  7. Program of RA reactor start-up to nominal power

    International Nuclear Information System (INIS)

    1959-01-01

    The zero start-up program is followed by the program of RA reactor start-up to nominal power. This program is described in detail and includes the following measurements: radiation characteristics at the exit of the channels; gamma and fast neutron dose distribution in the reactor; influence of absorbers on the reactivity; temperature effect; absolute flux and calibration of ionization chambers; xenon effect; thermal and hydraulics; dosimetry around the reactor; neutron flux in the reactor core and in the reactor hall; heavy water level; thermal characteristics after shutdown. A list of measuring devices and instrumentation is included with the detailed action plan and list of responsible staff members

  8. Nuclear Reactor RA Safety Report, Vol. 1, Introduction; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 1, Uvod

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    Based on the agreement between governments of Socialist Federal Republic of Yugoslavia and USSR of January 28 1956, a contract was signed about construction of RA research reactor in the Boris Kidric Institute of nuclear sciences. Building of the RA reactor started in 1956, and has reached criticality in 1959. Since then it has been in almost permanent operation, except for five longer shutdown periods: in 1963 because of heavy water and primary coolant system contamination with cobalt; in 1970 because of transporting the heavy water to France for isotopic regeneration; in 1979/1980 and 1983 because of aluminium oxyhydrate deposition on the fuel element cladding in reactor active region; in 1985/1986 because of ventilation system reconstruction and construction of emergency core cooling system. RA reactor is a heavy water cooled and heavy water moderated research reactor. Since the beginning of its operation, 2% enriched metal uranium fuel was used. From 1976, 80% enriched uranium oxide fuel elements were used partially in some core regions and since 1981 the complete core was filled with this highly enriched fuel. RA reactor was designed to operate under normal conditions at 6.5 MW power and at 10 MW power under forced regime. As a powerful neutron source the reactor was meant to be used for research in the field of reactor and neutron physics, solid state physics, radiation chemistry, biology and radioactive isotopes production. RA reactor was build by Yugoslav companies based on USSR basic design project. Main components of the systems were produced in USSR. [Serbo-Croat] Na osnovu Sporazuma izmedju vlada SFRJ i SSSR od 28. januara 1956. godine, sklopljen je ugovor o izgradnji istrazivackog reaktora RA u Institutu za nuklearne nauke Boris Kidric u Vinci. Reaktor RA je poceo da se gradi 1956. godine, a kriticnost je postigao 1959. godine. Od tada je takoreci neprekidno bio u radu, izuzev u pet slucajeva duzeg stajanja: 1963. godine - zbog kontaminacije teske vode

  9. Diagrams about RA reactor operation, Annex 7; Prilog 7 - Rad reaktora RA po godinama - dijagrami

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    This Annex 7 includes diagrams about RA reactor operation (MWh) from 1960-1975; mean values of reactor power per day and month in 1975, and percent of utilisation of experimental space during 1975. [Serbo-Croat] Ovaj prilog sadrzi dijagrame o radu reaktora (MWh) po godinama (1960-1975); srednje vrednosti dnevne snage reaktora u 1975. godini; rad reakrora (MWh) po mesecima u 1975; procenat iskoriscenja eksperimentalnog prostora u 1975. godini.

  10. RA reactor operation and maintenance in 1989, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Sanovic, V.

    1989-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in July 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The following major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the power supply system. Project concerned with renewal of RA reactor complete instrumentation was started at the end of 1988. Contract was signed between the IAEA and Soviet Atomenergoexport for supplying the new instrumentation for the RA reactor. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988. In 1989, device for water purification designed by the reactor staff started operation and spent fuel handling equipment is being mounted. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  11. RA Reactor operation and maintenance (I-IX), Part I; Pogon i odrzavanje reaktora RA (I-IX), I Deo

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    The report on RA reactor operation and maintenance for year 1963 is divided in six tasks. This volume contains the introductory report, and three tasks of the final report, namely reactor exploitation, reactivity changes of the RA reactor before repair, planning of refuelling.

  12. Measurement of neutrons in the RA reactor cell; Merenje neutrona u elementarnoj celiji reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N; Bosevski, T [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    A special experimental device was constructed for measuring the neutron flux distribution in the RA reactor cell. This device simulated the reactor cell in order to avoid disturbance in the reactor core. It was made of an aluminium cylindrical vessel having outer diameter same as the vertical experimental channel and contained three fuel slugs. Hole was made in through the center of the fuel slugs and a copper wire was placed in the hole for measuring the thermal neutron flux distribution. It was placed in the experimental channel VK-5 in the location of highest neutron flux. Handling of samples for irradiation was quite simple.

  13. Course of operators of the RA-3 reactor

    International Nuclear Information System (INIS)

    Caligiuri, G.A.

    1983-01-01

    Description of the fundamental principles of the nuclear reactors' control systems. The RA-3 reactor's control and measurement systems are principally described, without setting aside the basic criteria for the design of an appropriate instrumentation for the control of a nuclear reactor, as well as the theory on which the functioning of the several detectors and equipments used in a nuclear instrumentation are based. The main purpose of this course is that of serving, preferentially as a text, for the training of personnel which shall perform operation tasks in this reactor. The work includes three well-defined sections. The first two ones make an introduction to the subject, while the third one, extending to more than half-work, deals with the general description of the system in which the control and operation logic of RA-3 are included. (R.J.S) [es

  14. Instructions for RA reactor decontamination - Annex 10; Prilog 10 - Uputstvo za dekontaminaciju Reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-12-15

    Instructions for RA reactor decontamination includes: action plan for decontamination of the heavy water system by 7% water solution of H{sub 3}PO{sub 4} + 2% CrO{sub 3} acid; description of the preparatory work including calculation of the pipes volume and installation of special pipes; detailed instructions for decontamination procedure. [Serbo-Croat] Uputstvo za dekontaminaciju Reaktora RA sadrzi: plan operacija za dekontaminaciju sistema teske vode 7% vodenim rastvorom kiseline H{sub 3}PO{sub 4} + 2% CrO{sub 3}; opis pripremnih radova ukljucujuci proracun zapremine covovoda i montiranje posebnih cevovoda; detaljno uputstvo za izvodjenje operacija pri dekontaminaciji.

  15. RA reactor kinetic parameters - Progress report; Kineticki parametri reaktora RA - Izvestaj o napredovanju -

    Energy Technology Data Exchange (ETDEWEB)

    Petrovic, M; Obradovic, D; Jevtovic, V; Velickovic, Lj [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1965-11-15

    The objective of nuclear reactor kinetics study is to analyze the stability of reactor operation in practice. The obtained parameters should define the needed properties of automatic control system relevant for the stability of the designed reactor system. Refining the analytical models is done by using the analysis and interpretation of experimental data. Results of measured the reactor response obtained by using the reactor oscillator ROB-1 are explained by using the space independent model of the zero power reactor, by power reactor model with one feedback circuit, and by a complex model. It was assumed that the perturbations of the system are small and that linearized kinetic equations could be used. Linearized kinetic equation of the reactor system are transformed into the frequency region in order to analyze the measured values directly. The objective of this paper is to measure the RA reactor kinetics parameters, and analyze the stability of reactor operation at power levels high than nominal. Istrazivanja u oblasti kinetike nuklearnih reaktora imaju za cilj da dovedu analizu stabilnosti rada reaktora na nivo 'radne tehnologije'. Dobijeni pararametri treba da specificiraju potrebne karakteristike sistema automatske kontrole za odgovarajucu stabilnost projektovanog reaktorskog sistema. Doterivanjem analitickih modela do takvog nivoa da se zapazeni fenomeni mogu anailitcki predvideti ide preko analize i interpretacije eksperimentalnih podataka. Eksperimentalni rezultati merenja odziva reaktora, izvedeni reaktorskim oscilatorom ROB-1, interpretirani su na osnovu prostorno nezavisnog modela za reaktor nulte snage, modelom reaktora snage sa jednim kolom povratne sprege, kao i kompleksnim modelom. U ovom radu se poslo od toga da su perturbacije parametara sistema male, pa se mogu upotrebiti linearizovane kineticke jednacine. Linearizovane kineticke jednacine reaktorskog sistema transformirane su u frekventno podrucje s ciljem direktne analize mernih rezultata

  16. Nuclear Reactor RA Safety Report, Vol. 9, Radiation protection

    International Nuclear Information System (INIS)

    1986-11-01

    Instrumentation for Radiation protection existing at the RA reactor is dating mostly from the period 1957-1959 when the reactor has been built. With some minor exception it was produced in USSR. Radiation protection system was constructed based on specific design project, somewhat modified original USSR project which has been indispensable because of some modification of the building design. During the past 27 years no renewal of the instrumentation was done, only maintenance was performed. Instrumentation consists of old electronic devices which caused difficulties and even prevented regular maintenance because of lack of spare parts. Instrumentation for radiation protection at the RA reactor is classified as follows: centralized dosimetry system; stationary dosimetry instrumentation, movable and personal dosimetry systems. Apart from the scheme of dosimetry instrumentation this volume includes description of radiation protection procedures; protection devices; radiation doses and dose limit data; program for environmental radioactivity control; medical control procedures [sr

  17. RA reactor operation and maintenance in 1992, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktoro RA u 1992. Godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Majstorovic, D; Tanaskovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-12-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems. [Serbo-Croat] U toku 1992 godine poslovi u okviru projekta 'Istrazivacki nuklearni reaktor RA' obavljani su u skladu sa programom i planom rada. Osnovne aktivnosti na kojima je radjeno odnosile su se na revitalizaciju reaktora RA, kao i na odrzavanje opreme. U ovom periodu reaktor nije bio u pogonu. Svo osoblje je bilo angazovano na poslovima rekonstrukcije i modernizacije postojecih i dogradnje novih reaktorskih sistema, na odrzavanju opreme a deo tehnickog osoblja je bio obucavan za vrsenje odgovarajucih poslova u pogonu i odrzavanju opreme.

  18. Operation and maintenance of the RA reactor; Pogon i odrzavanje reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Petrovic, M; Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    During 1961 the RA reactor was used for irradiation of samples for 258 users ( from which 188 from the Institute) and for 34 experiments, this means productions of 5958 MWh. The production was almost four times bigger than during previous year due to the demand of the Laboratories of the Institute. Burnup of the fuel from the first batch was about 30%. This means that the operation time could be much higher. Number of safety shut-downs was 11. The reasons were related to electrical faults, 9 occurrences, failure of the instrument for reactor period measurement, once, and failure of the pump once. This report covers state and operation data of the reactor components, control instruments, devices for reactor protection, dosimetry, heavy water system, helium system, mechanical and electrical equipment. Problems related to training of the staff and lack of personnel are mentioned as well.

  19. ICMPv6 RA Flooding Vulnerability Research

    Directory of Open Access Journals (Sweden)

    Linas Jočys

    2016-06-01

    Full Text Available ICMPv6 is the newest version of internet control message protocol, whose main purpose is to send error message indicating packet processing failure. It is know that ICMPv6 is technologically vulnerable. One of those vulnerabilities is the ICMPv6 RA flooding vulnerability, which can lead to systems in Local Area Network slow down or full stop. This paper will discuss Windows (XP, 7, 8.1 and Linux Ubuntu 14 operating systems resistance to RA flooding attack research and countermeasures to minimize this vulnerability.

  20. Calculation of neutron spectra in the reactor cell of the RA experimental reactor in Vinca

    International Nuclear Information System (INIS)

    Bosevski, T.; Altiparmakov, D.; Marinkovic, N.

    1974-01-01

    In the frame of neutron properties of RA experimental reactor the study of energy neutron spectra in the reactor cell are planned. Complex reactor cell geometry, nine cylindrical regions causes high space-energy variations of neutron flux with a significant gradient both in energy and space variables. Treatment of such a complex problem needs adequate methodology which ensures reliable results and control of accuracy. This paper describes in detail the method for calculating group constants based on lattice cell calculation for the need of calculation of reactor core parameters. In 26 group approximation for the energy region from 0 - 10.5 MeV, values of neutron spectra are obtained in 18 space points chosen to describe, with high accuracy, integral reactor cell parameters of primary importance for the reactor core calculation. Obtained space-energy distribution of neutron flux in the reactor cell is up to now unique in the study of neutron properties of Ra reactor [sr

  1. Use of plate fuel elements for the RA3 reactor

    International Nuclear Information System (INIS)

    Parodi, C.; Parkanski, D.; Higa, M.; Marajofsky, A.

    1992-01-01

    The RA3 reactor is a pool reactor, redesigned for 5 MW dissipation. Nineteen plates are used in each fuel element. The utilization of 20% enriched U, gives the possibility of the development of rod type fuel with Al/U 3 O 8 cermets. The thermohydraulic and neutronic conditions are studied in this work in order to satisfy the stipulated power. In addition, the fabrication conditions of Al/U 3 O 8 and Al/U 3 O 8 /Zr H 2 cermets with densities within the limits imposed by the thermohydraulics and neutronics conditions are studied. (author)

  2. Nuclear Reactor RA Safety Report, Format and Contents

    International Nuclear Information System (INIS)

    1986-11-01

    This is a new complete version of the safety report of nuclear reactor RA is made according to the recommendations of the IAEA. Report includes all the relevant data needed for evaluation of safe operation of this nuclear facility. Each of seven volumes of this report cover separate topics as follows: (1) introduction; (2) Site characteristics; (3) description of the reactor building and installations; (4) description of the reactor; (5) description of the coolant system; (6) description of the regulation and safety instrumentation; (7) description of the power supply system; (8) description of the auxiliary systems; (9) radiation protection issues; (10) radioactive waste management (11) reactor operation; (12) accident analysis during previous operation; (13) analysis of possible accident causes; (14) safety analysis and preventive actions: (15) analysis of significant accidents; (16) analysis of maximum possible accident; (17) environmental impact analysis in case of accident [sr

  3. Corrosion of aluminium alloy test coupons in water of spent fuel storage pool at RA reactor

    International Nuclear Information System (INIS)

    Pesic, M.; Maksin, T.; Jordanov, G.; Dobrijevic, R.

    2004-12-01

    Study on corrosion of aluminium cladding, of the TVR-S type of enriched uranium spent fuel elements of the research reactor RA in the storage water pool is examined in the framework nr the International Atomic Energy Agency (IAEA) Coordinated Research Project (CRP) 'Corrosion of Research Reactor Clad-Clad Spent Fuel in Water' since 2002. Standard racks with aluminium coupons are exposed to water in the spent fuel pools of the research reactor RA. After predetermined exposure times along with periodic monitoring of the water parameters, the coupons are examined according to the strategy and the protocol supplied by the IAEA. Description of the standard corrosion racks, experimental protocols, test procedures, water quality monitoring and compilation of results of visual examination of corrosion effects are present in this article. (author)

  4. Safety shutdowns and failures of the RA reactor equipment; Sigurnosna zaustavljanja i kvarovi opreme na reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Mitrovic, S [Institut za nuklearne nauke ' Boris Kidric' , Vinca, Belgrade (Yugoslavia)

    1966-07-01

    This report is an attempt of statistical analysis of the failures occurred during RA reactor operation. A list of failures occurred on the RA equipment during 1965 is included. Failures were related to the following systems: dosimetry system (22%), safety and control system (7%), heavy water system (2%), technical water (4%), helium system (2%), measuring instruments (30%), transport, ventilation, power supply systems (32%). A review of safety shutdowns from 1962 to 1966 is included as well, as a comparison with three similar reactors. Although the number of events used for statistical analysis was not adequate, it has been concluded that RA reactor operation was stable and reliable.

  5. RA reactor safety analysis, Part II - Accident analysis; Analiza sigurnosti rada Reaktora RA I-III, Deo II - Analiza akcidenta

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N; Radanovic, Lj; Milovanovic, M; Afgan, N; Kulundzic, P [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    This part of the RA reactor safety analysis includes analysis of possible accidents caused by failures of the reactor devices and errors during reactor operation. Two types of accidents are analyzed: accidents resulting from uncontrolled reactivity increase, and accidents caused by interruption of cooling.

  6. Operation, maintenance and utilization of the RA reactor, Annual report 1978

    International Nuclear Information System (INIS)

    Milosevic, M.

    1978-12-01

    It has been planned for 1978 that the RA reactor would be operated for 158 dana at nominal power of 6.5 MW meaning production of 24 648 MWh. The plan was fulfilled since 24 652 MWh was produces. Reactor operation for 158 days is relevant to reactor operation for 200 days in the period before 1975. The reason is increased neutron flux achieved due to improved fuel management and the characteristics of the new 80% enriched fuel. At the end of 1978 the reactor core contained 45% of 80% enriched fuel elements. Increase of neutron flux has shortened the typical time needed for irradiation of the most important samples for isotope production. This significant success in reactor operation is at the same time an obligation for increasing its utilization. Some new trends proposed for increasing reactor utilization capacities were presented at the Conference on utilization of research nuclear reactors in Yugoslavia held in May 1978 [sr

  7. Online monitoring and diagnostic system on RA-6 nuclear reactor

    International Nuclear Information System (INIS)

    Garcia Peyrano, O. A.; Marticorena, M.; Koch, R. G.; Martinez, J. S; Berruti, G. E.; Nunez, W. M.; Gonzales, L. A.; Tarquini, L. D.; Sotelo, J. P

    2009-01-01

    This paper presents the Online Automatic Monitoring and Diagnostic System for mechanical components, installed on RA-6 Nuclear Reactor (San Carlos de Bariloche, Argentina). This system has been designed, installed and set-up by the Vibrations and Mechatronics Laboratory (Centro Atomico Bariloche, Comision Nacional de Energia Atomica) and Sitrack.com Argentina SA. This system provides an online mechanical diagnostic of the main reactor components, allowing incipient failures to be early detected and identified, avoiding unscheduled shut-downs and reducing maintenance times. The diagnostic is accomplished by an online analysis of the vibratory signature of the mechanical components, obtained by vibrations sensors on the main pump and the decay tank. The mechanical diagnostic and the main operational parameters are displayed on the reactor control room and published on the internet. [es

  8. RA reactor operation and maintenance, Annual report 1974

    International Nuclear Information System (INIS)

    Milosevic, D. et al

    1974-12-01

    During 1974, RA reactor was operated at nominal power for 194 days and 13 days at lower power levels. The total production was 30711 MWh which is 2.4% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 437 users. This report contains detailed data about reactor power and experiments performed in 1974. Total number of afety shutdowns was 11, of which 8 were caused by power cuts, and 3 due to human error. Maximum individual personnel exposure dose was 50% of the maximum permissible dose. There were no accidents during this year. Decontamination of surfaces was less than during previous years. About 805 m 2 of surfaces and 178 objects were decontaminated. It was concluded that the successful operation in 1974 has a special significance taking into account the financial problems [sr

  9. Temperature reactivity coefficient of the RA reactor; Temperaturni koeficijenat reaktivnosti reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N; Strugar, P; Dobrosavljevic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    Temperature reactivity coefficient of the RA reactor was determined as follows. Stabilization of moderator temperature and graphite reflector was achieved in the reactor operated at power levels of 20, 100, 500, 1000, 3000 and 5000 kW. Temperature change of the moderator was achieved by changing the water flow rate in the secondary cooling system. The fuel temperature was changed simultaneously. During the measurement at each power level the temperature change was between 30 - 50 deg C. Changing the position of the automated regulator is registered during moderator temperature change, and these changes were used for determining the total reactivity change by using the calibration curves for the automated regulator. In the measured temperature range the the reactivity change was linear and it was possible to determine the total temperature coefficient.

  10. Tasks related to increase of RA reactor exploitation and experimental potential, 03. Crane for handling the vertical experimental channels of the RA reactor - design project

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1963-07-01

    Within the work related to improvement of experimental potential of the RA reactor, this document describes the design project of the new crane for handling the vertical experimental channels of the RA reactor, engineering drawings of the crane main elements, mechanical part, design project of the electrical part of the crane and cost estimation

  11. Ventilation system in the RA reactor building - design specifications

    International Nuclear Information System (INIS)

    Badrljica, R.

    1984-09-01

    Protective role of the ventilation system of nuclear facilities involve construction of ventilation barriers which prevent release of radioactive particulates or gases, elimination od radioactive particulates and gases from the air which is released from contaminated zones into the reactor environment. Ventilation barriers are created by dividing the building into a number of ventilation zones with different sub pressure compared to the atmospheric pressure. The RA reactor building is divided into four ventilation zones. First zone is the zone of highest risk. It includes reactor core with horizontal experimental channels, underground rooms of the primary coolant system (D 2 O), helium system, hot cells and the space above the the reactor core. Second zone is the reactor hall and the room for irradiated fuel storage. The third zone includes corridors in the basement, ground floor and first floor where the probability of contamination is small. The fourth zone includes the annex where the contamination risk is low. There is no have natural air circulation in the reactor building. Ventilators for air input and outlet maintain the sub pressure in the building (pressure lower than the atmospheric pressure). This prevents release of radioactivity into the atmosphere [sr

  12. Ventilation system in the RA reactor building - design specifications; Sistem ventilacije u objektu 'RA' - Tehnicki opis

    Energy Technology Data Exchange (ETDEWEB)

    Badrljica, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1984-09-15

    Protective role of the ventilation system of nuclear facilities involve construction of ventilation barriers which prevent release of radioactive particulates or gases, elimination od radioactive particulates and gases from the air which is released from contaminated zones into the reactor environment. Ventilation barriers are created by dividing the building into a number of ventilation zones with different sub pressure compared to the atmospheric pressure. The RA reactor building is divided into four ventilation zones. First zone is the zone of highest risk. It includes reactor core with horizontal experimental channels, underground rooms of the primary coolant system (D{sub 2}O), helium system, hot cells and the space above the the reactor core. Second zone is the reactor hall and the room for irradiated fuel storage. The third zone includes corridors in the basement, ground floor and first floor where the probability of contamination is small. The fourth zone includes the annex where the contamination risk is low. There is no have natural air circulation in the reactor building. Ventilators for air input and outlet maintain the sub pressure in the building (pressure lower than the atmospheric pressure). This prevents release of radioactivity into the atmosphere. Zastitne uloge ventilacionog sistema kod nuklearnih postrojenja obuhvataju formiranje ventilacionih barijera koje onemugucavaju sirenje radioaktivnih cestica ili gasova putem cirkulacije vazduha; eliminaciju radioaktivnih cestica i gasova iz vazduha koji se evakuise iz kontaminiranih prostora u okolinu reaktorskog postrojenja. Formiranje zastitnih ventilacionih barijera ostvaruje se obicno podelom unutrasnjosti objekta na vise ventilacionih zona razlicitih podpritisaka u odnosu na spoljni atmosferski pritisak. Celi prostor zgrade reaktora RA podeljen je u cetiri ventilacione zone. Prva zona je zona najveceg rizika, u koju spadaju reaktorsko jezgro sa horizontalnim eksperimentalnim kanalima, tehnoloske

  13. New about research reactors

    International Nuclear Information System (INIS)

    Egorenkov, P.M.

    2001-01-01

    The multi-purpose research reactor MAPLE (Canada) and concept of new reactor MAPLE-CNF as will substitute the known Canadian research reactor NRU are described. New reactor will be used as contributor for investigations into materials, neutron beams and further developments for the CANDU type reactor. The Budapest research reactor (BRR) and its application after the last reconstruction are considered also [ru

  14. Nuclear reactors sources of contamination - RA reactor in Vinca as an example; Nuklearni reaktori kao izvori kontaminacije - Primer reaktora RA u Vinci -

    Energy Technology Data Exchange (ETDEWEB)

    Mitrovic, S; Djukic, Z; Dobrosavljevic, N [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1966-03-15

    This study contains an analysis of possible contamination caused by reactor accidents. In addition to description of maximum credible accident impacts on the environment it covers the prevention and procedures to be undertaken in case of accident. The RA reactor was taken as an example. Since the probability of maximum credible accident is very low minor accident that could cause fission products release were analyzed. Analysis of the spent fuel storage pool at the RA reactor is included as well.

  15. Nuclear research reactors

    International Nuclear Information System (INIS)

    1985-01-01

    It's presented data about nuclear research reactors in the world, retrieved from the Sien (Nuclear and Energetic Information System) data bank. The information are organized in table forms as follows: research reactors by countries; research reactors by type; research reactors by fuel and research reactors by purpose. (E.G.) [pt

  16. RA reactor action plan for 1977 - Annex VI; Prilog VI - Plan rada reaktora RA za 1977. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-12-15

    In the RA reactor action plan for 1977 it is foreseen that the reactor would be operated for 181 days, mostly at nominal power of 6.5 MW. It is planned to produce 28236 MWh in total. Five reactor core exchanges (refuelling) are planned. The plan includes time for repair of components as well as for cooling. [Serbo-Croat] Plan rada reaktora RA predvidja rad tokom 181 dana, vecim delom na nominalnoj snazi od 6,5 MW tokom 1977. godine. Planirano je da ukupni rad iznosi 28236 MWh. Planom je predvidjeno i pet izmena goriva kao i vreme potrebno za remont opreme i hladjenje.

  17. Research reactors - an overview

    International Nuclear Information System (INIS)

    West, C.D.

    1997-01-01

    A broad overview of different types of research and type reactors is provided in this paper. Reactor designs and operating conditions are briefly described for four reactors. The reactor types described include swimming pool reactors, the High Flux Isotope Reactor, the Mark I TRIGA reactor, and the Advanced Neutron Source reactor. Emphasis in the descriptions is placed on safety-related features of the reactors. 7 refs., 7 figs., 2 tabs

  18. An evaluation of the worker exposure during the RA reactor decommissioning due to presence of contamination

    International Nuclear Information System (INIS)

    Ljubenov, V.; Simovic, R.

    2005-01-01

    In this paper a possibility to establish the relationship between the presence of the surface contamination in the RA reactor rooms and the worker exposure during the decommissioning activities is discussed. RESRAD-BUILD code and the models typical for the RA reactor has been used to determine annual doses from the supposed activities of the main expected RA reactor contaminants. Different room air exchange rates have been modelled and analysed. (author) [sr

  19. Program of RA reactor start-up to nominal power; Program dizanja reaktora 'RA' na nominalnu snagu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1959-07-01

    The zero start-up program is followed by the program of RA reactor start-up to nominal power. This program is desed in detail and includes the following measurements: radiation characteristics at the exit of the channels; gamma and fast neutron dose distribution in the reactor; influence of absorbers on the reactivity; temperature effect; absolute flux and calibration of ionization chambers; xenon effect; thermal and hydraulics; dosimetry around the reactor; neutron flux in the reactor core and in the reactor hall; heavy water level; thermal characteristics after shutdown. A list of measuring devices and instrumentation is included with the detailed action plan and list of responsible staff members.

  20. A database model for the radiological characterization of the RA reactor in the 'Vinca' Institute

    International Nuclear Information System (INIS)

    Steljic, M.; Ljubenov, V.

    2004-01-01

    During the preparation and realization of the radiological characterization of nuclear facility it is necessary to organize, store, review and process large amount of various data types. The documentation has to be treated according to the quality assurance (QA) programme requirements, and to ultimate goal would be to establish the unique record management system (RMS) for the nuclear facility decommissioning project. This paper presents the design details of the database model for the radiological characterization of the RA research reactor (author) [sr

  1. Operation and maintenance of the RA reactor in 1965

    International Nuclear Information System (INIS)

    Milosevic, D.

    1966-01-01

    It has been planned for 1965 that the RA reactor would be operated each month for 20 days at nominal power of 6.5 MW, at lower power for 5 days, meaning production of 27 400 MWh. The plan was fulfilled since reactor produced 28809 MWh, i.e. 5% more than planned. Reactor was used for irradiation in the vertical experimental channels according to the demand of 1264 users from the Institute and 191 external users. Two groups of experiments done: at nominal power simultaneously with isotope production and experiments which demanded particular power levels and temperatures. Three fuel exchanges were done during this year, meaning that 40 fuel channels were changed in total. Vertical experimental channels VEK-1 and VEK-9 having diameter 100 mm were changed by channels having diameter 50 mm and shortened by 435 mm. Channel VEK-5 with diameter 110 mm was changed shortened by 430 mm. This enabled better fuel economy, the burnup was increased from 4500 MWd/t to 5000 MWd/t. This report contains the action plan for 1966

  2. Decontamination of the RA reactor heavy water system, Annex 9

    International Nuclear Information System (INIS)

    Maksimovic, Z.B.; Nikolic, R.M.; Marinkovic, M.D.; Jelic, Lj.M.

    1963-01-01

    Both stainless steel and aluminium parts of the RA reactor heavy water system system were decontaminated as well as the heavy water itself. System was contaminated with 60 Co. Decontamination factor was determined by activity measurements during distillation. Concentration of the corrosion products in the heavy water was measured by spectrochemical analysis, and found to be 0.1 - 1 mg/l. Chemical analyses of the aluminium and stainless steel surfaces showed that cobalt was adsorbed on the aluminium oxide layer. Water solution of 7%H 3 PO 4 + 2% CrO 3 was used for decontamination of the heavy water system and distillation device. This was found to be the most efficient solvent which does not affect stainless steel corrosion. Decontamination factors achieved were from 60 - 100. Decontamination results enabled determining the distribution of cobalt in the system: 10 Ci on the stainless steel parts, 50 Ci in the heavy water; and above 600 Ci on the fuel and experimental channels. Specific activity of 60 Co was calculated to be 15 Ci/g on the reactor channels, 8 Ci/g on the stainless steel parts and 3 Ci/g in the heavy water. Decontamination of the aluminium parts was not done because it was considered it could initiate corrosion. Since the efficiency of distillation is increased it was expected that permanent distillation would remove most of the activity in the reactor channels

  3. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VII Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities.

  4. Irradiation of an uranium silicide prototype in RA-3 reactor

    International Nuclear Information System (INIS)

    Calabrese, R.; Estrik, G.; Notari, C.

    1996-01-01

    The factibility of irradiation of an uranium silicide (U 3 Si 2 ) prototype in the RA-3 reactor was studied. The standard RA-3 fuel element uses U 3 O 8 as fissible material. The enrichment of both standard and prototype is the same: 20% U 235 and also the frame geometry and number of plates is identical. The differences are in the plate dimensions and the fissile content which is higher in the prototype. The cooling conditions of the core allow the insertion of the prototype in any core position, even near the water trap, if the overall power is kept below 5Mw. Nevertheless, the recommendation was to begin irradiation near the periphery and later on move the prototype towards more central positions in order to increase the burnup rate. The prototype was effectively introduced in a peripheral position and the thermal fluxes were measured between plates with the foil activation technique. These were also evaluated with the fuel management codes and a reasonable agreement was found. (author). 5 refs., 3 figs., 3 tabs

  5. Ra reactor operation plan for 1976 - Annex 6

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    Contrary to previous years the RA reactor operation plan for 1976 is conditioned by more uncertainties than ever for the following reasons. It is planned for February to repair the components in order to eliminate the consequences of leaking from the vertical experimental channel VK-4 which happened in december 1975. Apart from this, measurements related to transfer of the core to highly enriched fuel under minimum power are foreseen to be performed in February. In April, it would be indispensable to locate the point of He gas leaking and its prevention. Core transfer to highly enriched fuel is planned for April for testing of the fuel elements under operating conditions and step by step increase of the power density up to the nominal power. Complete plan for core transfer would be available by the end of February 1976. It is planned to make-up for the mentioned delays from May-December 1976 [sr

  6. Consolidation of the neutron spectrum in the RA-6 reactor

    International Nuclear Information System (INIS)

    Bazzana, S.; Chiaraviglio, N.

    2013-01-01

    Unfolding procedures can be used to determine the neutron or gamma spectrum in a multigroup structure from experimental and calculation results. In this way, it is possible to adjust with high reliability magnitudes that cannot be directly measured. For neutron unfolding it is necessary the use of a set of detectors with different energetic response. In this work we describe two unfolding experiences in different positions of the RA-6 reactor of the Bariloche Atomic Centre. One of them consisted in the unfolding in an incore position and the other one in the BNCT facility beam.Experimental techniques and neutron detectors for each experience are described along with the correction factors that must be taken into account for each experience. In both cases there is good agreement between measured and adjusted quantities. (author) [es

  7. Investigation of corrosion of materials of the irradiation device in the RA reactor

    International Nuclear Information System (INIS)

    Zaric, M.; Mance, A.; Vlajic, M.

    1963-12-01

    Devices for sample irradiation in the vertical RA reactor channels will be made of aluminium alloys. According to the regulations concerned with introducing materials into the RA reactor core, corrosion characterisation of these materials is an obligation. Corrosion properties of four aluminium alloys were investigated both in contact with stainless steel and without it. First part of this report deals with the corrosion testing of aluminium alloys in water by gravimetric and electrochemical methods. Bi-distilled water at temperatures less than 100 deg C was used. Second part is related to aluminium alloys corrosion in carbon dioxide gas under experimental conditions. The second part of research was initiated by the design of the head of the independent CO 2 loop for samples cooling [sr

  8. Nuclear Reactor RA Safety Report, Vol. 8, Auxiliary system; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 8, Pomocni sistemi

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    This volume describes RA reactor auxiliary systems, as follows: special ventilation system, special drainage system, hot cells, systems for internal transport. Ventilation system is considered as part of the reactor safety and protection system. Its role is eliminate possible radioactive particles dispersion in the environment. Special drainage system includes pipes and reservoirs with the safety role, meaning absorption or storage of possible radioactive waste water from the reactor building. Hot cells existing in the RA reactor building are designed for production of sealed radioactive sources, including packaging and transport. [Serbo-Croat] Ova knjiga obuhvata opis pomocnih sistem reaktora RA: sistem specijalne ventilacije, sistem specijalne kanalizacije, vruce komore, sistemi za unutrasnji transport. Ventilacioni sistem je znacajan deo sistema zastite i sigurnosti reaktora. Njegova je uloga da onemoguci disperziju radioaktivnih cestica u okolinu. Sistem specijalne kanalizacije sastoji se od agregata, cevovoda i rezervoara sa sigurnosnom armaturom i ima zadatak da prihvata i u sebe deponuje radioaktivne otpadne vode iz objekarta reaktora RA. U zgradi reaktora RA postoje vruce komore koje su namenjene za proizvodnju zatvorenih izvora zracenje, ukljucujuci i mehanicku obradu, prepakivanje i transport.

  9. Radiation protection at the RA Reactor in 1984, Part -2, Annex 2a: Radioactivity control of the RA reactor environment - atmospheric precipitations, dust, water, soil, plants, fruit.

    International Nuclear Information System (INIS)

    Ajdacic, N.; Martic, M.; Jovanovic, J.

    1984-01-01

    Control of radioactivity in the biosphere in the vicinity of the RA reactor is part of the radioactivity control done regularly for the whole territory of the Vinca institute. During 1984 control was conducted according to the plan. According to the measured data no significant changes have been found in the surroundings of the RA reactor. All the analysed samples have followed the activity values of the precipitations

  10. Operation, maintenance and utilization of the RA reactor, Annual report 1978; Pogon, odrzavanje i eksploatacija reaktora RA, Izvestaj o radu u 1978. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1978-12-15

    It has been planned for 1978 that the RA reactor would be operated for 158 dana at nominal power of 6.5 MW meaning production of 24 648 MWh. The plan was fulfilled since 24 652 MWh was produces. Reactor operation for 158 days is relevant to reactor operation for 200 days in the period before 1975. The reason is increased neutron flux achieved due to improved fuel management and the characteristics of the new 80% enriched fuel. At the end of 1978 the reactor core contained 45% of 80% enriched fuel elements. Increase of neutron flux has shortened the typical time needed for irradiation of the most important samples for isotope production. This significant success in reactor operation is at the same time an obligation for increasing its utilization. Some new trends proposed for increasing reactor utilization capacities were presented at the Conference on utilization of research nuclear reactors in Yugoslavia held in May 1978. [Serbo-Croat] Reaktor RA imao je u planu za 1978. godinu 158 dana rada na nominalnoj snazi od 6.5 MW, sto odgovara radu od 24 648 MWh. Ostvareno je 24 652 MWh sto znaci da je plan ostvaren. Rad reaktora od 158 dana odgovara radu reaktora od 200 dana u periodu pre 1975. godine. Razlog je povecanje neutronskog fluksa zahvaljujuci usavrsenom rukovanju gorivom i karakteristikama novog 80% obogacenog goriva. Krajem 1978. godine 45% jezgra reaktora bilo je popunjeno novim 80% obogacenim gorivom. Povecani neutronski fluks omogucio je skracenje vremena ozracivanja vaznih uzoraka za proizvodnju radioaktivnih izotopa. Ovaj znacajan uspeh je istovremeno obaveza znatno veceg iskoriscenja reaktora RA. Rezultati napora da se postigne vece iskoriscenje reaktora RA prezentirani su na Konferenciji o koriscenju nuklearnih reaktora u Jugoslaviji koja je odrzana u maju 1978.

  11. Measurements at the RA Reactor related to the VISA-2 project - Part 1, Start-up of the RA reactor and measurement of new RA reactor core parameters; Fizicka merenja na reaktoru RA u vezi projekta VISA-2 - I deo, Pustanje u rad reaktora RA i merenje fizickih parametara novog jezgra reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Markovic, H [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1962-07-15

    The objective of the measurements was determining the neutron flux in the RA reactor core. Since the number of fuel channels is increased from 56 to 68 within the VISA-2 project, it was necessary to attain criticality of the RA reactor and measure the neutron flux properties. The 'program of RA reactor start-up' has been prepared separately and it is included in this report. Measurements were divided in two phases. First phase was measuring of the neutron flux after the criticality was achieved but at zero power. During phase two measurements were repeated at several power levels, at equilibrium xenon poisoning. This report includes experimental data of flux distributions and absolute values of the thermal and fast neutron flux in the RA reactor experimental channels and values of cadmium ratio for determining the neutron epithermal flux. Data related to calibration of regulatory rods for cold un poisoned core are included. [Serbo-Croat] Svrha merenja je odredjivanje neutronskog fluksa u reaktoru RA. S obzirom na uvecani broj tehnoloskih kanala of 56 na 68 u vezi projekta VISA-2, bilo je potrebno ponovo dovesti reaktora RA do kriticnosti i izvrsiti merenja karakteristika fluksa neutrona. Posebno je pripremljen 'program pustanja u pogon reaktora RA', koji je sadrzan u ovom dokumentu. Program merenja bio je podeljen na dve faze. Prva faza je merenje fluksa pre podizanju reaktora na nominalnu snagu. Slicna merenja vrsena su i na vecim snagama u drugoj fazi, pod uslovima ravnoteznog zatrovanja reaktora ksenonom, jer se tada pokazuju izvesne promene u odgovarajucim karakteristikama fluksa neutrona. Ovaj izvestaj sadrzi merene vrednosti raspodele fluksa i apsolutne vrednosti termalnih i brzih neutrona kao i kadmijumskih odnosa koji su korisceni za odredjivanje fluksa epitermalnih neutrona. Opisana je kalibracija regulacionih sipki za hladan nezatrovan reaktor.

  12. Safety aspects of the cleaning and conditioning of radioactive sludge from spent fuel storage pool on 'RA' Research reactor in the Vinca Institute

    International Nuclear Information System (INIS)

    Pavlovic, R; Pavlovic, S.; Plecas, I.

    1999-01-01

    Spent fuel elements from nuclear reactors in the Vinca Institute have been temporary stored in water filled storage pool. Due to the fact that the water in the spent fuel elements storage pool have not been purified for a long time, all metallic components submerged in the water have been hardly corroded and significant amount of the sludge has been settled on the bottom of the pool. As a first step in improving spent fuel elements storage conditions and slowing down corrosion in the storage spent fuel elements pool we have decided to remove the sludge from the bottom of the pool. Although not high, but slightly radioactive, this sludge had to be treated as radioactive waste material. Some safety aspects and radiation protection measures in the process of the spent fuel storage pool cleaning are presented in this paper

  13. The CEA research reactors

    International Nuclear Information System (INIS)

    Schwartz, J.P.

    1993-01-01

    Two main research reactors, specifically designed, PEGASE reactor and Laue-Langevin high flux reactor, are presented. The PEGASE reactor was designed at the end of the 50s for the study of the gas cooled reactor fuel element behaviour under irradiation; the HFR reactor, was designed in the late 60s to serve as a high yield and high level neutron source. Historical backgrounds, core and fuel characteristics and design, flux characteristics, etc., are presented. 5 figs

  14. RA reactor operation and maintenance in 1994, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1994. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Mikic, N; Tanaskovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1994-12-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. The spent fuel elements used from the very beginning of reactor operation are stored in the existing pools. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988 and was fulfilled in 1990. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Zavrseni su radovi na izgradnji sistema za udesno hladjenje, rekonstrukciji postojeceg sistema specijalne ventilacije i rekonstrukciji sistema za napajanje elektricnom energijom. Zapoceti su radovi na modernizaciji, odnosno zameni instrumentacije reaktora ali njegova realizacija kasni

  15. Tasks related to increase of RA reactor exploitation and experimental potential, 04. Device for transport of radioactive reactor channels and semi channels of the RA reactor, design project (I-III) Part II, Vol. II; Radovi na povecanju eksploatacionih i eksperimentalnih mogucnosti reaktora RA, 04. Uredjaj za transport aktivnih tehnoloskih kanala I semikanala reaktora RA - izrada projekta (I-III), II Deo, Album II

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-07-15

    This second volume includes calculations of the main components of the transporter, description of the mechanical part of the transporter and the engineering drawing of the device for transport of radioactive reactor channels and semi channels of the RA reactor.

  16. RA reactor operation in 1991, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1991. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1991, three major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. Renewal of the reactor instrumentation was started but but it is behind the schedule in 1991 because the delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA for political reasons. In 1991 most of the existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Training of the existing personnel was done regularly, but lack of financial support prevented employment of new workers that would be needed for operation in shifts and regular maintenance. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Kako bi se ubuduce mogao obezbediti

  17. Safety analysis of RA Reactor operation I-III; Analiza sigurnosti rada Reaktora RA I - III, IZ-213-0322-1963

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    This safety analysis report covers the following three parts: Technical and operational characteristics of the RA reactor; Accidents analysis; and Environmental effects of the maximum possible accident. [Serbo-Croat] Ovaj izvestaj o analizi sigurnosti rada reaktora RA sastoji se od tri dela: Tehnicke i pogonske karakteristike reaktora RA; Analiza akcidenta; i Posledice maksimalno moguceg akcidenta na okolinu reaktora.

  18. RA reactor operation and maintenance in 1989, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1989. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Zivotic, Z; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1989-12-15

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in July 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The following major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the power supply system. Project concerned with renewal of RA reactor complete instrumentation was started at the end of 1988. Contract was signed between the IAEA and Soviet Atomenergoexport for supplying the new instrumentation for the RA reactor. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988. In 1989, device for water purification designed by the reactor staff started operation and spent fuel handling equipment is being mounted. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula 1984. Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Zavrseni su radovi na izgradnji sistema za udesno hladjenje, rekonstrukciji postojeceg sistema specijalne ventilacije i rekonstrukciji sistema za napajanje elektricnom energijom. Krajem 1988, medjunarodna agencija za atomsku energiju potpisala je ugovor sa sovjetskom firmom Atomergexport za izradu novog sistema instrumentacije. Sa ciljem da se poveca i efikasnije koristi prostor za skladistenje ozracenog goriva, 1987. godine zapoceta je realizacija projekata preciscavanja vode u bazenima za odlezavanje

  19. Proceedings of the Conference on research reactors application in Yugoslavia

    International Nuclear Information System (INIS)

    1978-05-01

    The Conference on research reactors operation was organised on the occasion of 20 anniversary of the RB zero power reactor start-up. The presentations showed that research reactors in Yugoslavia, RB, RA and TRIGA had an important role in development of nuclear sciences and technology in Yugoslavia. The reactors were applied in non-destructive testing of materials and fuel elements, development of reactor noise techniques, safety analyses, reactor control methods, neutron activation analysis, neutron radiography, dosimetry, isotope production, etc [sr

  20. Safeguarding research reactors

    International Nuclear Information System (INIS)

    Powers, J.A.

    1983-03-01

    The report is organized in four sections, including the introduction. The second section contains a discussion of the characteristics and attributes of research reactors important to safeguards. In this section, research reactors are described according to their power level, if greater than 25 thermal megawatts, or according to each fuel type. This descriptive discussion includes both reactor and reactor fuel information of a generic nature, according to the following categories. 1. Research reactors with more than 25 megawatts thermal power, 2. Plate fuelled reactors, 3. Assembly fuelled reactors. 4. Research reactors fuelled with individual rods. 5. Disk fuelled reactors, and 6. Research reactors fuelled with aqueous homogeneous fuel. The third section consists of a brief discussion of general IAEA safeguards as they apply to research reactors. This section is based on IAEA safeguards implementation documents and technical reports that are used to establish Agency-State agreements and facility attachments. The fourth and last section describes inspection activities at research reactors necessary to meet Agency objectives. The scope of the activities extends to both pre and post inspection as well as the on-site inspection and includes the examination of records and reports relative to reactor operation and to receipts, shipments and certain internal transfers, periodic verification of fresh fuel, spent fuel and core fuel, activities related to containment and surveillance, and other selected activities, depending on the reactor

  1. Investigation of corrosion of materials of the irradiation device in the RA reactor; Ispitivanje korozije materijala uredjaja za ozracivanje na reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Zaric, M; Mance, A; Vlajic, M [Institute of Nuclear Sciences Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    Devices for sample irradiation in the vertical RA reactor channels will be made of aluminium alloys. According to the regulations concerned with introducing materials into the RA reactor core, corrosion characterisation of these materials is an obligation. Corrosion properties of four aluminium alloys were investigated both in contact with stainless steel and without it. First part of this report deals with the corrosion testing of aluminium alloys in water by gravimetric and electrochemical methods. Bi-distilled water at temperatures less than 100 deg C was used. Second part is related to aluminium alloys corrosion in carbon dioxide gas under experimental conditions. The second part of research was initiated by the design of the head of the independent CO{sub 2} loop for samples cooling. [Serbo-Croat] Uredjaji za ozracivanje u vertikalnim kanalima reaktora RA, bice napravljeni od legura aluminjuma. Prema propisima o unosenju materijala u RA reaktor materijali se moraju prethodno ispitati i sa stanovista korozije. Ispitivane su korozione pojave na cetiri aluminjumske legure sa i bez kontakta sa nerdjajucim celikom. Prvi deo ovog rada tretira pitanje korozije legura aluminijuma u vodi gravimetrijskim i elektrohemijskim metodama. Koriscena je bidestilovana voda na temperaturi do 100 deg C. Drugi deo se odnosi na ispitivanje ponasanja legura aluminijuma u gasovitom ugljen dioksidu pod uslovima eksperimenta. Drugi deo istrazivanja izvrsen je za potrebe izgradnje glave petlje nezavisnog kola za hladjenje uzoraka gasovitim CO{sub 2}.

  2. Nuclear Reactor RA Safety Report, Vol. 12, Accidents during reactor operation

    International Nuclear Information System (INIS)

    1986-11-01

    This volume includes description and analysis of typical accidents occurred during operation of RA reactor in chronological order, as follows: contamination of primary coolant circuit; leakage of heavy water from the primary coolant loop; contamination of vertical experimental channel; air contamination in the reactor building and loss of circulation of the primary coolant; failures of the vacuum pump and spent fuel packaging device; rupture of the spent fuel element cladding; dethronement's of capsule for irradiation of fuel element; rupture of the vertical experimental channel and contamination of the surroundings; swelling of a fuel element; appearance of deposits on the surface of the fuel elements cladding. The last chapter describes similar accidents occurred on nuclear reactors in the world [sr

  3. Calculation of the flow distribution for the new core of the RA-6 reactor

    International Nuclear Information System (INIS)

    Garcia, J.C.; Delmastro, Dario F.

    2007-01-01

    In this work the pressure drop, the flow distribution, effective cooling flow rate and the velocity in the subchannels that cool fuel plates for the new core of RA-6 research reactor were calculated. These calculations were performed for a flow of 340 m 3 /hr and water temperatures of 12 C degrees, of 35 C degrees and 42 C degrees. The flow distribution was calculated without considering either safety factors or geometric changes. All the calculations were performed considering the flow as isothermal. (author) [es

  4. CAC-RA1 1958-1998. The first years of the Constituyentes Atomic Center (CAC). History of the first Argentine nuclear reactor (RA-1)

    International Nuclear Information System (INIS)

    Forlerer, Elena; Palacios, Tulio A.

    1998-01-01

    After giving the milestones of the development of the Constituyentes Atomic Center since 1957, the history of the construction of the first nuclear reactor (RA-1) in Argentina, including the local fabrication of its fuel elements, is surveyed. The RA-1 reached criticality on January 17, 1958. The booklet commemorates the 40th year of the reactor operation

  5. RA reactor Action plan for 1978 - Annex VI; Prilog VI - Plan rada reaktora RA za 1978. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-12-15

    This annex include a detailed monthly action plan of the RA reactor for 1978. It was planned that the reactor will operate at nominal and lower power levels for 158 days. The plan is made with the aim to achieve same annual neutron flux as in 1977, which is somewhat higher then the annual production in the period from 1968-1975. [Serbo-Croat] Ovaj prilog sadrzi detaljan plan rada reaktora RA za 1978. godinu. Planirano je da reaktor radi na nominalnoj snazi of 6,5 MW i na manjim snagama ukupno 158 dana. Plan je napravljen tako da se ostvari godisnja proizvodnja neutronskog fluksa u obimu koji je relaizovan 1977. godine sto je nesto vise od godisnje proizvodnje u periodu 1968-1975.

  6. The epithermal neutron-flux distribution in the reactor RA - Vinca

    International Nuclear Information System (INIS)

    Marinkov, V.; Bikit, I.; Martinc, R.; Veskovic, M.; Slivka, J.; Vaderna, S.

    1987-01-01

    The distribution of the epithermal neutron flux in the reactor RA - Vinca has been measured by means of Zr - activation detectors. In the channel VK-8 non-homogeneous flux distribution was observed (author) [sr

  7. Description of the control and safety systems of the RA reactor; Opis sistema za upravljanje i sigurnosnu zastitu RA

    Energy Technology Data Exchange (ETDEWEB)

    Popovic, B; Pesic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Yugoslavia)

    1962-07-01

    This report contains detailed description and scheme of the control and safety system of the RA reactor. It consists of interconnected five systems: for automated regulation; compensation rods; safety rods; power density measurement device; period meter; automated D{sub 2}O level meter in the core. Automated regulation system is divided into two parts: basic system for reactor operation regime at power from 10kW - 10 MW and precise regulation system for operation at set-up power level up to 10 kW which is used occasionally.

  8. Fast neutron flux in the RA reactor experimental channels; Fluks brzih neutrona u eksperimentalnim kanalima reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N; Dobrosavljevic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    Fast neutron flux in the RA reactor experimental channels was determined by using threshold reaction detectors. The (n,p) type reactions S{sub 32} (n,p)P{sub 32}, and Al{sub 24} (n,p)Na{sub 24}. Prepared sulphur and phosphorous foils were placed in cadmium boxes and irradiated in experimental channels VK-5, VK-7 and VK-9. Gold foils were irradiated simultaneously for controlling the reactor power. Reactor power was 100 kW during irradiation of half an hour. Activity of P{sub 32} and S{sub 31} after reactor shutdown was measured by 4{pi} counter and three calibrated GM counters. Absolute neutron flux was determined by using thus obtained data.

  9. Operation and maintenance of RA Reactor, Annual report 1977; Pogon i odrzavanje reaktora RA - Izvestaj o radu u 1977. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1977-12-15

    During 1977, the RA Reactor was operated at nominal power of 6.5 MW for 183 days. Total production was 28582 MWh which is 10% higher than planned. Second phase of introducing the 80% enriched fuel was fulfilled according to the plan. This means that the reactor core will be filled with highly enriched fuel in 1978. Refueling was done three time during the past year. After completing the first phase of the fuel exchange which was related mostly to reactor safety, the second phase will be devoted to the more efficient increase of neutron flux . This second phase is of utmost importance because higher neutron flux will provide better and more efficient reactor application from economic point of view. This will justify the application of the new more expensive highly enriched fuel. The budget for reactor operation and maintenance is hardly enough to cover the maintenance of the components and instrumentation. During 1977 there were no accidents related nor incidents related to the instrumentation or related to radiation protection. [Serbo-Croat] Reaktor RA je u toku 1977. godine ostvario rad od 28583 MWh odnosno 183 dana rada na nominalnoj snazi, sto u odnosu na plan rada iznosi 10% vise od planiranog. Druga faza uvodjenja 80% obogacenog goriva izvrsena je prema planu sto znaci da ce se punjenje jezgra reaktora 80% gorivom zavrsiti u toku 1978. godine. Izvrsene su tri izmene goriva. Posle isteka prvog dela prelaznog rezima koji je usmeren na maksimalnu sigurnost reaktora preci ce se na drugi deo usmeren na vece i brze povecanje neutronskog fluksa. Druga faza je od izuzetnog znacaja jer ce omoguciti bolje i znatno ekonomicnije koriscenje reaktora i opravdati upotrebu novog i skupljeg goriva. Sredstva za pogon i odrzavanje reaktora RA su jedva dovoljna za odrzavanje neophodnog nivoa opreme. Akcidenata u toku 1977. godine nije bilo ni sa opremom ni u pogledu zastite od zracenja.

  10. RA Reactor operation and maintenance (I-IX), part VI, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VI Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the period planned for maintenance and refurbishment of the RA reactor the gas reactor system including the ventilation system was inspected and tested, the components were cleaned. This report describes detailed instructions and actions concerning repair and decontamination of the gas and ventilation systems components.

  11. IV Training program for the staff of the laboratory for the RA reactor exploitation; IV Programi obuke osoblja Laboratorije za eksploataciju reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-07-01

    All the staff members of the laboratory for RA reactor exploitation are obliged to learn the following: fundamental properties of the RA reactor, the role and functionality of the reactor components, basic and auxiliary reactor systems, basics of radioactivity, measures for preventing contamination. The personnel working in shifts must be acquainted with the regulations and instructions for reactor operation. Training programs for reactor operators, mechanics, electricians, instrumentators and dosimetrysts are described separately. Svi saradnici Laboratorije za eksploataciju reaktora RA moraju poznavati sledece oblasti: Osnovne karakeristike reaktora RA, princip rada, ulogu i funkcionisanje komponenti reaktora, osnovnih i pomocnih sistema reaktora; osnovne pojmove o radioaktivnom zracenju, mere za sprecavanje kontaminacije. Osoblje koje radi u smenama mora dodatno poznavati propise i uputstva za rad reaktora. Posebno je naveden program obuke operatora reaktora, mehanicara, electricara, instrumentatora, dozimetrista.

  12. Nuclear Reactor RA Safety Report, Vol. 9, Radiation protection; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 9, Zastita od zracenja

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    Instrumentation for Radiation protection existing at the RA reactor is dating mostly from the period 1957-1959 when the reactor has been built. With some minor exception it was produced in USSR. Radiation protection system was constructed based on specific design project, somewhat modified original USSR project which has been indispensable because of some modification of the building design. During the past 27 years no renewal of the instrumentation was done, only maintenance was performed. Instrumentation consists of old electronic devices which caused difficulties and even prevented regular maintenance because of lack of spare parts. Instrumentation for radiation protection at the RA reactor is classified as follows: centralized dosimetry system; stationary dosimetry instrumentation, movable and personal dosimetry systems. Apart from the scheme of dosimetry instrumentation this volume includes description of radiation protection procedures; protection devices; radiation doses and dose limit data; program for environmental radioactivity control; medical control procedures. [Serbo-Croat] Instrumentacija za zastitu od zracenja koja danas postoji na reaktoru RA najvecim delom potice iz perioda 1957-1959 kada je reaktor gradjen. Sa malim izuzetcima instrumentacija je proizvedena u SSSR. Sistem za zastitu izveden je na osnovu posebnog projekta koji predstavlja modifikaciju originalnog projekta koja je bila neophodna usled modifikovanog gradjevinskog projekta. U proteklom periodu od 27 godina instrumentacija nije obnavljana vec je vrseno samo odrzavanje. Instrumentacija je izradjena u danas prevazidjenoh tehnoligiji (elektronske cevi) sto je otezavalo i skoro onemogucavalo normalno odrzavanje. Instrumentacija za zastitu od zracenja na reaktoru RA moze se podeliti na tri dela: centralizovani dozimetrijski sistem; stacionarna dozimetrijska instrumentacija; prenosna i licna dozimetrijska instrumentacija. Pored seme sistema dozimetrijske kontrole ova knjiga sadrzi opis

  13. Modelling of the RA-1 reactor using a Monte Carlo code; Modelado del reactor RA-1 utilizando un codigo Monte Carlo

    Energy Technology Data Exchange (ETDEWEB)

    Quinteiro, Guillermo F; Calabrese, Carlos R [Comision Nacional de Energia Atomica, General San Martin (Argentina). Dept. de Reactores y Centrales Nucleares

    2000-07-01

    It was carried out for the first time, a model of the Argentine RA-1 reactor using the MCNP Monte Carlo code. This model was validated using data for experimental neutron and gamma measurements at different energy ranges and locations. In addition, the resulting fluxes were compared with the data obtained using a 3D diffusion code. (author)

  14. Radiation protection at the RA Reactor in 1985, Part -4, decontamination and treatment of solid radioactive materials for the needs of RA reactor

    International Nuclear Information System (INIS)

    Plecas, I.; Vukovic, Z.; Blagojevic, R.; Kostadinovic, A.

    1985-01-01

    This report describes the activity of the decontamination and treatment team for the needs of the RA reactor, its equipment, working conditions, methods for decontamination, means of decontamination, type and quantity of decontaminated surfaces, number of decontaminated objects, quantity of collected radioactive solid wastes, their packaging, transport to the storage place and topography od radiation field in the storage during 1985 [sr

  15. Multi purpose research reactor

    International Nuclear Information System (INIS)

    Raina, V.K.; Sasidharan, K.; Sengupta, Samiran; Singh, Tej

    2006-01-01

    At present Dhruva and Cirus reactors provide the majority of research reactor based facilities to cater to the various needs of a vast pool of researchers in the field of material sciences, physics, chemistry, bio sciences, research and development work for nuclear power plants and production of radio isotopes. With a view to further consolidate and expand the scope of research and development in nuclear and allied sciences, a new 20 MWt multi purpose research reactor is being designed. This paper describes some of the design features and safety aspects of this reactor

  16. Thermal hydraulic modelling of the Mo and Iridium irradiation facilities of the RA10 reactor

    International Nuclear Information System (INIS)

    Gramajo, M.; García, J.; Marcel, C.P.

    2013-01-01

    The RA-10 reactor is a multipurpose, open pool research reactor. The core consists of a rectangular array of MTR type fuel. The produced thermal power is 30 MW which is extracted by the refrigeration system via an ascendant flow through the core. The core reflector is D 2 O contained in a watertight tank. The design of the reactor includes a number of out-core facilities which are meant to be used for industrial, medical and research purposes. Among all the facilities, the most important ones are the Molybdenum and Iridium ones which we modeled in this work. During the normal operation of the reactor, the manipulation and the on-line extraction of the irradiation facilities is foreseen. Therefore the study of the head loss during the normal operation as well as during the extraction maneuvers plays a relevant role in the design and safety analysis. In this work a CFD commercial code is use dto perform the calculations needed to guarantee the design requirements.In addition, a full detailed geometric model for both, the Molybdenum and Iridium facilities,is used to perform the required simulations. The obtained results allow to evaluating the thermal-hydraulic performance of the proposed facilities designs. (author)

  17. Multipurpose research reactors

    International Nuclear Information System (INIS)

    1988-01-01

    The international symposium on the utilization of multipurpose research reactors and related international co-operation was organized by the IAEA to provide for information exchange on current uses of research reactors and international co-operative projects. The symposium was attended by about 140 participants from 36 countries and two international organizations. There were 49 oral presentations of papers and 24 poster presentations. The presentations were divided into 7 sessions devoted to the following topics: neutron beam research and applications of neutron scattering (6 papers and 1 poster), reactor engineering (6 papers and 5 posters), irradiation testing of fuel and material for fission and fusion reactors (6 papers and 10 posters), research reactor utilization programmes (13 papers and 4 posters), neutron capture therapy (4 papers), neutron activation analysis (3 papers and 4 posters), application of small reactors in research and training (11 papers). A separate abstract was prepared for each of these papers. Refs, figs and tabs

  18. Up-dating of the RA-0 reactor shielding. Gamma and neutron isodoses

    International Nuclear Information System (INIS)

    Murua, Carlos A.; Chautemps, Norma A.; Ackerley, Alejandro F.; Alexeiew, Vladimiro

    1999-01-01

    A comparative analysis of the historical shielding configurations of the RA-0 reactor is performed and the comparison methodology is described. The gamma and neutron dose mapping of the last two stages of the reactor shielding has been carried out and the results are analysed

  19. Reactor Materials Research

    International Nuclear Information System (INIS)

    Van Walle, E.

    2001-01-01

    The activities of the Reactor Materials Research Department of the Belgian Nuclear Research Centre SCK-CEN in 2000 are summarised. The programmes within the department are focussed on studies concerning (1) fusion, in particular mechanical testing; (2) Irradiation Assisted Stress Corrosion Cracking (IASCC); (3) nuclear fuel; and (4) Reactor Pressure Vessel Steel (RPVS)

  20. Reactor Materials Research

    Energy Technology Data Exchange (ETDEWEB)

    Van Walle, E

    2001-04-01

    The activities of the Reactor Materials Research Department of the Belgian Nuclear Research Centre SCK-CEN in 2000 are summarised. The programmes within the department are focussed on studies concerning (1) fusion, in particular mechanical testing; (2) Irradiation Assisted Stress Corrosion Cracking (IASCC); (3) nuclear fuel; and (4) Reactor Pressure Vessel Steel (RPVS)

  1. Physical measurements at the RA reactor related to VISA-2, e. Measurements of flux and reactivity during RA reactor operation and exploitation; Fizicka merenja na reaktoru RA u vezi projekta VISA-2, e. Pracenje fluksa i reaktivnosti u toku eksploatacije reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Markovic, H [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-05-15

    This report includes the following: characteristics of neutron flux in vertical experimental channels of the RA reactor; characteristics of neutron flux in VISA-2 channels; reactivity changes in the reactor during VISA-2 irradiation including calibration of control rods.

  2. Nuclear Reactor RA Safety Report, Vol. 16, Maximum hypothetical accident

    International Nuclear Information System (INIS)

    1986-11-01

    Fault tree analysis of the maximum hypothetical accident covers the basic elements: accident initiation, phase development phases - scheme of possible accident flow. Cause of the accident initiation is the break of primary cooling pipe, heavy water system. Loss of primary coolant causes loss of pressure in the primary circuit at the coolant input in the reactor vessel. This initiates safety protection system which should automatically shutdown the reactor. Separate chapters are devoted to: after-heat removal, coolant and moderator loss; accident effects on the reactor core, effects in the reactor building, and release of radioactive wastes [sr

  3. Ageing of research reactors

    International Nuclear Information System (INIS)

    Ciocanescu, M.

    2001-01-01

    Historically, many of the research institutions were centred on a research reactor facility as main technological asset and major source of neutrons for research. Important achievements were made in time in these research institutions for development of nuclear materials technology and nuclear safety for nuclear energy. At present, ageing of nuclear research facilities among these research reactors and ageing of staff are considerable factors of reduction of competence in research centres. The safe way of mitigation of this trend deals with ageing management by so called, for power reactors, Plant Life Management and new investments in staff as investments in research, or in future resources of competence. A programmatic approach of ageing of research reactors in correlation with their actual and future utilisation, will be used as a basis for safety evaluation and future spending. (author)

  4. Siting of research reactors

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of this document is to develop criteria for siting and the site-related design basis for research reactors. The concepts presented in this document are intended as recommendations for new reactors and are not suggested for backfitting purposes for facilities already in existence. In siting research reactors serious consideration is given to minimizing the effects of the site on the reactor and the reactor on the site and the potential impact of the reactor on the environment. In this document guidance is first provided on the evaluation of the radiological impact of the installation under normal reactor operation and accident conditions. A classification of research reactors in groups is then proposed, together with a different approach for each group, to take into account the relevant safety problems associated with facilities of different characteristics. Guidance is also provided for both extreme natural events and for man-induced external events which could affect the safe operation of the reactor. Extreme natural events include earthquakes, flooding for river or coastal sites and extreme meteorological phenomena. The feasibility of emergency planning is finally considered for each group of reactors

  5. Australian research reactor studies

    International Nuclear Information System (INIS)

    McCulloch, D.B.

    1978-01-01

    The Australian AEC has two research reactors at the Lucas Heights Research Establishment, a 10 HW DIDO class materials testing reactor, HIFAR, and a smaller 100kW reactor MOATA, which was recently upgraded from 10kW power level. Because of the HIFAR being some 20 years old, major renewal and repair programmes are necessary to keep it operational. To enable meeting projected increases in demand for radioisotopes, plans for a new reactor to replace the HIFAR have been made and the design criteria are described in the paper. (author)

  6. Actions needed for RA reactor exploitation - I-IV, Part I, Thermotechnical experiments related to RA reactor hot start-up; Radovi za potrebe eksploatacije reaktora RA - I-IV, I Deo, Termotehnicki eksperimenti u vezi pustanja rektora RA na snagu

    Energy Technology Data Exchange (ETDEWEB)

    Novakovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    Heavy water coolant loop of the RA reactor includes the reactor, circulation pumps, heat exchangers and pipes. The objective of this task was measuring the thermal parameters of the RA reactor during operation. This report contains the results of the experiment, calculations of thermal regime for the outer and inner tubes, maximum temperature of the fuel element, fluid flow rate in the reactor channels, temperature of the coolant and fuel element cladding.

  7. Analysis of a possible experimental assessment of a prototype fuel element containing burnable poison in the RA-3 reactor

    International Nuclear Information System (INIS)

    Lerner, Ana Maria; Madariaga, Marcelo

    2002-01-01

    The Argentine RA-3 research reactor (5 MW) is presently operated with LEU fuel by the National Atomic Energy Commission (CNEA). It belongs to the group of nuclear installations controlled, from the radiological and nuclear safety point of view, by the Nuclear Regulatory Authority (ARN). A new type of fuel elements containing burnable absorbers, with similar enrichment as the standard fuel elements but greater fissile contents, has recently been proposed for a new Argentine reactor design (RRR). In this framework the ARN considers interesting, if technically possible, the performance of an experiment in the RA-3 reactor. The experiment might enable, for such fuel element containing burnable poison, the verification of its neutronic behaviour under irradiation as well as a validation of the calculation line by comparison to measured values. It should be desirable that such experiment could reproduce as much as possible those conditions estimated for the RRR reactor, still under design in Argentina, having Silicide fuel elements with burnable poison, in the shape of cadmium wires in their structure. We here analyse a possible experiment consisting in the loading of a prototype fuel element with burnable poison in a normally loaded RA-3 core configuration. It would essentially be a standard RA-3 fuel element, having cadmium wires in its frame. This experiment would enable the verification of the prototype behaviour under irradiation, its operation limits and conditions, and particularly, the reactivity safety margins established in Argentine Standards, both calculated and measured. The main part of the experiment would imply some 200 full power days of operation at 5 MW, which would be drastically reduced if the reactor power is increased to 10 MW, as foreseen. We also show that under the proposed conditions, the experiment would not represent a significant penalty to the reactor normal operation. (author)

  8. Regulations and instructions for RA reactor operation; Propisi i uputstva za pogon reaktora 'A'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-07-01

    This regulatory guide consists of following 4 chapters: Description of the RA reactor, organization scheme, regulations for performing experiments; Regulations for staff on duty; Instructions for operating the vacuum systems, heavy water and helium systems; and evacuation in case of accident. [Serbo-Croat] Ovaj pravilnik sadrzi sledeca 4 poglavlja: Opis reaktora RA, sema organizacije rada, propisi za izvodjenje eksperimenata; Pravilnik za rad dezurnog osoblja; Uputstva za rada sa vakuum sistemima, sistemom teske vode, sistemom helijuma; evakuacija u slucaju udesa.

  9. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.

    1999-01-01

    As a consequences of the government decision in September 1997. ANSTO established a replacement research reactor project to manage the procurement of the replacement reactor through the necessary approval, tendering and contract management stages This paper provides an update of the status of the project including the completion of the Environmental Impact Statement. Prequalification and Public Works Committee processes. The aims of the project, management organisation, reactor type and expected capabilities are also described

  10. Radiation protection at the RA Reactor in 1986, Part -2, Annex 2a, Radioactivity control of the RA reactor environment (atmospheric precipitations, dust, water, soil, plants, fruit...)

    International Nuclear Information System (INIS)

    Ajdacic, N.; Martic, M.; Jovanovic, J.

    1986-01-01

    Control of radioactivity in the biosphere in the vicinity of the RA reactor is part of the radioactivity control done regularly for the whole territory of the Vinca institute (report by the same authors included in this Annex). During 1986 control was conducted according to the plan until May 1, 1986 when a dramatic increase of the precipitations and all other samples from the biosphere was recorded. According to the measured data no significant changes have been found in the surroundings of the RA reactor, until April 29 1986. Since then more detailed control was conducted, the number of samples was increased, apart from standard measuring procedure of total beta activity measurements, gamma spectrometry of all samples was applied. High activity level of the following nuclides was found: Iodine, cerium,cesium, tellurium, ruthenium, barium, lanthanum, etc. As an example activity of ?1?3?1 I in one sample was 564±5 kBq/m 2 [sr

  11. CAC-RA1 1958-1998. The first years of the Constituyentes Atomic Center (CAC). History of the first Argentine nuclear reactor (RA-1); CAC-RA-1 1958-1998. Los primeros anios del CAC. Historia del primer reactor nuclear argentino (RA-1)

    Energy Technology Data Exchange (ETDEWEB)

    Forlerer, Elena; Palacios, Tulio A [comps.

    1998-07-01

    After giving the milestones of the development of the Constituyentes Atomic Center since 1957, the history of the construction of the first nuclear reactor (RA-1) in Argentina, including the local fabrication of its fuel elements, is surveyed. The RA-1 reached criticality on January 17, 1958. The booklet commemorates the 40th year of the reactor operation.

  12. Tasks related to increase of RA reactor exploitation and experimental potential, 03. Crane for handling the vertical experimental channels of the RA reactor - design project; Radovi na povecanju eksploatacionih i eksperimentalnih mogucnosti reaktora RA, 03. Kran za opsluzivanje vertikalnih eksperimentalnih kanala reaktora RA - izrada projekta

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-07-15

    Within the work related to improvement of experimental potential of the RA reactor, this document describes the design project of the new crane for handling the vertical experimental channels of the RA reactor, engineering drawings of the crane main elements, mechanical part, design project of the electrical part of the crane and cost estimation.

  13. Radiation protection at the RA reactor in 1984, Part II c Radioactivity control in the environment of the RA reactor, Meteorology measurements

    International Nuclear Information System (INIS)

    Grsic, Z.; Zaric, M.; Nikolic, R.; Stevanovic, M.

    1984-01-01

    During 1984, meteorology measurements were continued as a part of the environmental control of the Vinca Institute. This report covers the period from December 1983 - November 1984. Part of the meteorology measurements and data analysis is adapted to the needs of the Institute, i.e. RA reactor and some Laboratories. The objective of these activities is forming the data base for solving everyday and special problems related to control, protection and safety of Institute environment

  14. Necessity of research reactors

    International Nuclear Information System (INIS)

    Ito, Tetsuo

    2016-01-01

    Currently, only three educational research reactors at two universities exist in Japan: KUR, KUCA of Kyoto University and UTR-KINKI of Kinki University. UTR-KINKI is a light-water moderated, graphite reflected, heterogeneous enriched uranium thermal reactor, which began operation as a private university No. 1 reactor in 1961. It is a low power nuclear reactor for education and research with a maximum heat output of 1 W. Using this nuclear reactor, researches, practical training, experiments for training nuclear human resources, and nuclear knowledge dissemination activities are carried out. As of October 2016, research and practical training accompanied by operation are not carried out because it is stopped. The following five items can be cited as challenges faced by research reactors: (1) response to new regulatory standards and stagnation of research and education, (2) strengthening of nuclear material protection and nuclear fuel concentration reduction, (3) countermeasures against aging and next research reactor, (4) outflow and shortage of nuclear human resources, and (5) expansion of research reactor maintenance cost. This paper would like to make the following recommendations so that we can make contribution to the world in the field of nuclear power. (1) Communication between regulatory authorities and business operators regarding new regulatory standards compliance. (2) Response to various problems including spent fuel measures for long-term stable utilization of research reactors. (3) Personal exchanges among nuclear experts. (4) Expansion of nuclear related departments at universities to train nuclear human resources. (5) Training of world-class nuclear human resources, and succession and development of research and technologies. (A.O.)

  15. Chemical dosimetry of the RA reactor at Vinca, Yugoslavia; Hemijska dozimetrija reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Gal, O; Markovic, V; Radak, B [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1969-07-01

    The ten-year work on in-pile chemical dosimetry of the Radiation chemistry Department at the Boris Kidric Institute at Vinca is reviewed. As an introduction, the general theory of the dosimetry of two-component radiation field is given and the uses of the derived equations in calorimetry and chemical dosimetry have been discussed. The chemical systems worked out for the in-pile use: solid oxalic acid and their solutions in light and heavy water, are then described and also the procedures of their use. The latter two are treated as a double system particularly suitable for two-component radiation fields. Finally, the limitations in use are discussed and some other systems, the study of which is in progress, mentioned (malonic and succinic acid) (author) [Serbo-Croat] Merenje energije koju apsorbuje sistem izlozen zracenju sastavni je deo svakog radijaciono-hemijskog eksperimenta. Time se moze objasniti veliki interes za koriscenje postojecih i razvijanje novih metoda dozimetrije u laboratorijama koje se bave radijacionom hemijom. Poslednjih godina posebna paznja se posvecuje dozimetriji vrlo visokih doza (10{sup 2}-10{sup 3} mrad) narocito onih sa kojima se radi u polju mesovitog zracenja reaktora. U laboratoriji za radijacionu hemiju Instituta 'Boris Kidric' u Vinci na dozimetriji zracenja reaktorskog jezgra radi se vec skoro 10 godina. Ta aktivnost je deo rada na hemijskoj dozimetriji uopste, kojom se bavi ova laboratorija od svog postanka (kraj 1955. godine). Sa radom na dozimetriji kod nas otpocelo se u periodu prvog podizanja na snagu reaktora RA, krajem 1959. godine. Paralelno su razvijane i primenjivane i hemijske i kalorimetrijske metode i njima vrsena dozimetrijska kalibracija reaktora. U ovom radu ucestvovalo je vise istrazivaca iz Laboratorije za radijacionu hemiju uz tesnu saradnju sa reaktorskim fizicarima i osobljem reaktora RA. Cilj ovog napisa je da sumira nas rad na hemijskoj dozimetriji reaktora. Pri tom se, najpre, zeli da ukaze na sustinu

  16. Research reactor support

    International Nuclear Information System (INIS)

    2005-01-01

    Research reactors (RRs) have been used in a wide range of applications including nuclear power development, basic physics research, education and training, medical isotope production, geology, industry and other fields. However, many research reactors are fuelled with High Enriched Uranium (HEU), are underutilized and aging, and have significant quantities of spent fuel. HEU inventories (fresh and spent) pose security risks Unavailability of a high-density-reprocessable fuel hinders conversion and limits back-end options and represents a survival dilemma for many RRs. Improvement of interim spent fuel storage is required at some RRs. Many RRs are under-utilized and/or inadequately funded and need to find users for their services, or permanently shut down and eventually decommission. Reluctance to decommission affect both cost and safety (loss of experienced staff ) and many shut down but not decommissioned RR with fresh and/or spent fuel at the sites invoke serious concern. The IAEA's research reactor support helps to ensure that research reactors can be operated efficiently with fuels and targets of lower proliferation and security concern and that operators have appropriate technology and options to manage RR fuel cycle issues, especially on long term interim storage of spent research reactor fuel. Availability of a high-density-reprocessable fuel would expand and improve back end options. The International Atomic Energy Agency provides assistance to Member States to convert research reactors from High Enriched Uranium fuel and targets (for medical isotope production) to qualified Low Enriched Uranium fuel and targets while maintaining reactor performance levels. The assistance includes provision of handbooks and training in the performance of core conversion studies, advice for the procurement of LEU fuel, and expert services for LEU fuel acceptance. The IAEA further provides technical and administrative support for countries considering repatriation of its

  17. Thai research reactor

    International Nuclear Information System (INIS)

    Aramrattana, M.

    1987-01-01

    The Office of Atomic Energy for Peace (OAEP) was established in 1962, as a reactor center, by the virtue of the Atomic Energy for Peace Act, under operational policy and authority of the Thai Atomic Energy for Peace Commission (TAEPC); and under administration of Ministry of Science, Technology and Energy. It owns and operates the only Thai Research Reactor (TRR-1/M1). The TRR-1/M1 is a mixed reactor system constituting of the old MTR type swimming pool, irradiation facilities and cooling system; and TRIGA Mark III core and control instrumentation. The general performance of TRR-1/M1 is summarized in Table I. The safe operation of TRR-1/M1 is regulated by Reactor Safety Committee (RSC), established under TAEPC, and Health Physics Group of OAEP. The RCS has responsibility and duty to review of and make recommendations on Reactor Standing Orders, Reactor Operation Procedures, Reactor Core Loading and Requests for Reactor Experiments. In addition,there also exist of Emergency Procedures which is administered by OAEP. The Reactor Operation Procedures constitute of reactor operating procedures, system operating procedures and reactor maintenance procedures. At the level of reactor routine operating procedures, there is a set of Specifications on Safety and Operation Limits and Code of Practice from which reactor shift supervisor and operators must follow in order to assure the safe operation of TRR-1/M1. Table II is the summary of such specifications. The OAEP is now upgrading certain major components of the TRR-1/M1 such as the cooling system, the ventilation system and monitoring equipment to ensure their adequately safe and reliable performance under normal and emergency conditions. Furthermore, the International Atomic Energy Agency has been providing assistance in areas of operation and maintenance and safety analysis. (author)

  18. RA reactor operation and maintenance, Annual report 1974; Pogon i odrzavanje reaktora RA - Izvestaj o radu u 1974. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1974-12-15

    During 1974, RA reactor was operated at nominal power for 194 days and 13 days at lower power levels. The total production was 30711 MWh which is 2.4% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 437 users. This report contains detailed data about reactor power and experiments performed in 1974. Total number of afety shutdowns was 11, of which 8 were caused by power cuts, and 3 due to human error. Maximum individual personnel exposure dose was 50% of the maximum permissible dose. There were no accidents during this year. Decontamination of surfaces was less than during previous years. About 805 m{sup 2} of surfaces and 178 objects were decontaminated. It was concluded that the successful operation in 1974 has a special significance taking into account the financial problems. [Serbo-Croat] Reaktor RA je u 1974. godini radio na nominalnoj snazi 194 dana i 13 dana na manjim snagama. Ukupni rad iznosio je 30711 MWh odnosno 1,4% vise od planiranog. Prakticno nije bilo odstupanja od plana rada. Reaktor je koriscen za ozracivanja i eksperimente za 437 korisnika. Ovaj izvestaj sadrzi detaljne podatke o radu i eksperimentima koji su obavljani. U toku godine bilo je 11 sigurnosnih zaustavljanja, od cega 8 zbog elektricnog napona i 3 usled greske osoblja. Ukupna doza ozracivanja ljudstva bila je manja nego prethodnih godina. Maksimalna doza po oveku bila je 50% manja od maksimalno dozvoljene doze. Nije bilo ni jednog akcidenta. Dekontaminirano je znatno manje povrsina nego ranijih godina, i sakupljeno manje otpada nego prethodnih godina, dok tecnih efluenata nije bilo. Zakljuceno je da uspesan rad reaktora u 1974. godini ima poseban znacaj kada se imaju na umu problemi finansiranja reaktora.

  19. Research reactor DHRUVA

    International Nuclear Information System (INIS)

    Veeraraghaven, N.

    1990-01-01

    DHRUVA, a 100 MWt research reactor located at the Bhabha Atomic Research Centre, Bombay, attained first criticality during August, 1985. The reactor is fuelled with natural uranium and is cooled, moderated and reflected by heavy water. Maximum thermal neutron flux obtained in the reactor is 1.8 X 10 14 n/cm 2 /sec. Some of the salient design features of the reactor are discussed in this paper. Some important features of the reactor coolant system, regulation and protection systems and experimental facilities are presented. A short account of the engineered safety features is provided. Some of the problems that were faced during commissioning and the initial phase of power operation are also dealt upon

  20. Dosimetry and radiation shielding at the RA reactor, Annual report 1975, Annex 5

    International Nuclear Information System (INIS)

    Ninkovic, M.

    1976-01-01

    In the working environment at the RA reactor, the level of gamma radiation is measured continuously by the built-in stationary system. According to the needs, measurement are done in the reactor hall every day. The level of gamma radiation is measured separately in typical points when the reactor is operated at nominal power and during intervals between two operating campaigns. The level of neutron radiation is measured according to the needs by means of a mobile spherical neutron detector. These measurements are done in the reactor hall around the horizontal experimental channels. Measured values of neutron radiation are three times lower than the relevant levels of gamma radiation [sr

  1. Safety analysis of an irradiation device for 99Mo production in RA-3 reactor

    International Nuclear Information System (INIS)

    Lerner, Ana Maria; Madariaga, Marcelo; Waldman, Ricardo

    2000-01-01

    The Argentine RA-3 research reactor (5 MW) has been converted to LEU fuel more than nine years ago. Since then, it has been operating with LEU fuel, which has been designed and fabricated at the National Atomic Energy Commission (CNEA). The Nuclear Regulatory Authority (ARN) is the institution in charge of the installation safety control. It is under this framework that the ARN has elaborated a neutronic calculation model for the RA-3 core, paying special attention to the device presently used for the irradiation of (HEU) 235 U targets required to obtain 9 '9Mo as a fission product. A regulatory analysis of results is carried out in the framework of ARN standards for fixed experiments. For such purpose, calculated reactivity values associated with such device are compared with recently measured values at the installation. Finally, and according to guidelines established in the first part of this work, a calculation model for a new device proposed by CNEA for the irradiation of metallic (LEU) uranium targets and still at its design stage, is here analysed. (author)

  2. In vivo BNCT in experimental and spontaneous tumors at RA-1 reactor

    International Nuclear Information System (INIS)

    Trivillin, Veronica A.; Heber, Elisa M.; Itoiz, Maria E.; Schwint, Amanda E.; Nigg, David W.

    2003-01-01

    Within the search for new applications of Boron Neutron Capture Therapy (BNCT) and the basic research oriented towards the study of BNCT radiobiology to optimize its therapeutic gain, we previously proposed and validated the hamster cheek pouch oral cancer model and showed, for the first time, the success of BNCT to treat oral cancer in an experimental model. The staff of the Ra-1 Reactor (Constituyentes Atomic Center) adapted the thermal beam and physical set-up to perform in vivo BNCT of superficial tumors in small animals. We preformed a preliminary characterization of the thermal beam, performed beam only irradiation of normal and tumor bearing hamsters and in vivo BNCT of experimental oral squamous cell carcinomas in hamsters mediated by boron phenylalanine (BPA) and GB-10 (Na 2 10 B 10 H 10 ). Having demonstrated the absence of radio toxic effects in healthy tissue and a therapeutic effect of in vivo BNCT in hamster cheek pouch tumors employing the Ra-1 thermal beam, we performed a feasibility study of the treatment by BNCT of 3 terminal cases of spontaneous head and neck squamous cell carcinoma in cats following the corresponding biodistribution studies. This was the first treatment of spontaneous tumors by BNCT in our country and the first treatment by BNCT in cats worldwide. This preclinical study in terminal cases showed significant tumor control by BNCT with no damage to normal tissue. (author)

  3. Tritium release during inspection of reactor 'RA' at 'Vinca' institute

    International Nuclear Information System (INIS)

    Sipka, V.; Miljevic, N.; Grsic, Z.; Todorovic, D.; Radenkovic, M.

    1997-01-01

    Tritium content in daily precipitation, atmospheric water vapor inside of the reactor hall and around 'Vinca' Institute as well as in soil up to 800 m distance was monitoring during the regular inspection of the fuel channels. Tritium activity in the reactor hall air moisture was in the range from 0.022 to 6.7 MBq/m 3 . Tritium content in soil moisture between 12.7 and 530.9 Bq/l indicate a certain contamination due to tritium release in the environment, depending on the depth and distance from the place of release (author) [sr

  4. Service for maintenance of electronic equipment of the RA reactor, Report for 1977 - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1977-01-01

    This report describes the tasks and organizational structure of the Service for maintenance of electronic equipment of the RA reactor. The most important task of this Service is control and maintenance of the reactor control and protection instruments, operation control, and dosimetry system. Besides data about this basic instrumentation, the report includes data about control and maintenance of other electronic equipment related to the experimental devices [sr

  5. Financial report on the investment and maintenance of the RA reactor and equipment, Annex 5

    International Nuclear Information System (INIS)

    2002-01-01

    For the purpose of maintenance of the RA reactor building and equipment, Serbian Ministry of science, technology and development has approved financial support for the following: purchase and installing 12 new battery cells in the reactor building, for purchase of the missing fire protection equipment, and purchasing the material for protection of the roof of the ventilation center. All the planned tasks were fulfilled [sr

  6. Operation and maintenance of the RA reactor in 1965; Pogon i odrzavanje reaktora RA. Izvestaj o radu u 1965. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1966-01-15

    It has been planned for 1965 that the RA reactor would be operated each month for 20 days at nominal power of 6.5 MW, at lower power for 5 days, meaning production of 27 400 MWh. The plan was fulfilled since reactor produced 28809 MWh, i.e. 5% more than planned. Reactor was used for irradiation in the vertical experimental channels according to the demand of 1264 users from the Institute and 191 external users. Two groups of experiments done: at nominal power simultaneously with isotope production and experiments which demanded particular power levels and temperatures. Three fuel exchanges were done during this year, meaning that 40 fuel channels were changed in total. Vertical experimental channels VEK-1 and VEK-9 having diameter 100 mm were changed by channels having diameter 50 mm and shortened by 435 mm. Channel VEK-5 with diameter 110 mm was changed shortened by 430 mm. This enabled better fuel economy, the burnup was increased from 4500 MWd/t to 5000 MWd/t. This report contains the action plan for 1966.

  7. Modelling of the RA-1 reactor using a Monte Carlo code

    International Nuclear Information System (INIS)

    Quinteiro, Guillermo F.; Calabrese, Carlos R.

    2000-01-01

    It was carried out for the first time, a model of the Argentine RA-1 reactor using the MCNP Monte Carlo code. This model was validated using data for experimental neutron and gamma measurements at different energy ranges and locations. In addition, the resulting fluxes were compared with the data obtained using a 3D diffusion code. (author)

  8. Backfitting of research reactors

    International Nuclear Information System (INIS)

    Delrue, R.; Noesen, T.

    1985-01-01

    The backfitting of research reactors covers a variety of activities. 1. Instrumentation and control: Control systems have developed rapidly and many reactor operators wish to replace obsolete equipment by new systems. 2. Pool liners: Some pools are lined internally with ceramic tiles. These may become pervious with time necessitating replacement, e.g. by a new stainless steel liner. 3. Heat removal system: Deficiencies can occur in one or more of the cooling system components. Upgrading may require modifications of the system such as addition of primary loops, introduction of deactivation tanks, pump replacement. Recent experience in such work has shown that renewal, backfitting and upgrading of an existing reactor is economically attractive since the related costs and delivery times are substantially lower than those required to install a new research reactor

  9. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.; Horlock, K.

    2001-01-01

    The contract for the design, construction and commissioning of the Replacement Research Reactor was signed in July 2000. This was followed by the completion of the detailed design and an application for a construction licence was made in May 2001. This paper will describe the main elements of the design and their relation to the proposed applications of the reactor. The future stages in the project leading to full operation are also described

  10. Nuclear Reactor RA Safety Report, Vol. 12, Accidents during reactor operation; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 12, Akcidenti u dosadasnjem radu reaktora

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    This volume includes description and analysis of typical accidents occurred during operation of RA reactor in chronological order, as follows: contamination of primary coolant circuit; leakage of heavy water from the primary coolant loop; contamination of vertical experimental channel; air contamination in the reactor building and loss of circulation of the primary coolant; failures of the vacuum pump and spent fuel packaging device; rupture of the spent fuel element cladding; dethronement's of capsule for irradiation of fuel element; rupture of the vertical experimental channel and contamination of the surroundings; swelling of a fuel element; appearance of deposits on the surface of the fuel elements cladding. The last chapter describes similar accidents occurred on nuclear reactors in the world. [Serbo-Croat] Ova knjiga sadrzi hronoloski pregled i analizu karakteristika akcidenata u dosadasnjem radu reaktora RA: kontaminacija primarnog kola hladjenja; isticanje teske vode is primarnog kola hladjenje; kontaminacija eksperimentalnog vertikalnog kanala; kontaminacija vazduha u hali reaktora i prestanak cirkulacije primarnog hladioca; otkaz vakum pumpe i uredjaja za prepakivanje ozracenog goriva; proboj kosuljice ozracenog gorivnog elementa; dehermetizacija kapsule za ozracivanje nuklearnog goriva; proboj eksperimentalnog vertikalnog kanala i kontaminacija prostorija; bubrenje gorivnog elementa; pojava taloga na kosuljicama gorivnih elemenata. Poslednje poglavlje opisuje udese na koji su se dogodili na nuklearnim reaktorima u svetu.

  11. Optimization of the neutron calculation model for the RA-6 reactor

    International Nuclear Information System (INIS)

    Coscia, G.A.

    1981-01-01

    A model for the neutronic calculation of the RA-6 reactor which includes the codes ANISN and EQUIPOSE is analyzed. Starting with a brief description of the reactor, the core and its parts, the general scheme of calculation applied is presented. The fuel elements used were those which are utilized in the RA-3 reactor; this is of the MTR type with 90% enriched uranium. With the approximations used, an analysis of such model of calculation was made, trying to optimize it by reducing, if possible, the calculation time without loosing accuracy. In order to improve the calculation model, it is recomended a cross section data library specific for the enrichment of the fuel considered 90% and the incorporation of a more advanced code than EQUIPOISE which would be DIXYBAR. (M.E.L.) [es

  12. Nuclear reactor instrumentation at research reactor renewal

    International Nuclear Information System (INIS)

    Baers, B.; Pellionisz, P.

    1981-10-01

    The paper overviews the state-of-the-art of research reactor renewals. As a case study the instrumentation reconstruction of the Finnish 250 kW TRIGA reactor is described, with particular emphasis on the nuclear control instrumentation and equipment which has been developed and manufactured by the Central Research Institute for Physics, Budapest. Beside the presentation of the nuclear instrument family developed primarily for research reactor reconstructions, the quality assurance policy conducted during the manufacturing process is also discussed. (author)

  13. Utilization of research reactors

    International Nuclear Information System (INIS)

    1962-01-01

    About 200 research reactors are now in operation in different parts of the world, and at least 70 such facilities, which are in advanced stages of planning and construction, should be critical within the next two or three years. In the process of this development a multitude of problems are being encountered in formulating and carrying out programs for the proper utilization of these facilities, especially in countries which have just begun or are starting their atomic energy work. An opportunity for scientific personnel from different Member States to discuss research reactor problems was given at an international symposium on the Programing and Utilization of Research Reactors organized by the Agency almost immediately after the General Conference session. Two hundred scientists from 35 countries, as well as from the European Nuclear Energy Agency and EURATOM, attended the meeting which was held in Vienna from 16 to 21 October 1961

  14. Moderators for the design of a cold neutron source for the RA 3 reactor

    International Nuclear Information System (INIS)

    Cantargi, F; Sbaffoni, M; Granada, R

    2004-01-01

    The cold neutron production of hydrogenous materials was studied, taking into account their radiation resistance, for the conceptual design of a cold neutron source for the RA-3 reactor.Low spontaneous release of chemical energy was found in mesitylene.Libraries for hidrogen in mesitylene were generated using the NJOY nuclear processing system and the resulting cross sections were compared with experimental data.Good agreement between measurements and calculations was found in those cases where data are available.New calculations using the RA-3 geometry and these validated libraries will be performed [es

  15. Design of neutron radiography facility in pool for the reactor RA-10

    International Nuclear Information System (INIS)

    Peirone, M.; Coleff, A.; Sanchez, F.; Chiaraviglio, N.

    2013-01-01

    RA-10 project consists in the design and construction of a multipurpose reactor for multiple applications, including radioisotopes production, material testing and an in pool facility for neutron imaging. Neutron imaging is a powerful tool for studies of materials and offer several advantages among other attenuation-based techniques. In this study mechanical and neutronic requirements for the RA-10 in pool neutron imaging facility are described. The MCNP neutronic model and the mechanical design satisfying these requirements in a first engineering stage are described. (author)

  16. Reactor Materials Research

    Energy Technology Data Exchange (ETDEWEB)

    Van Walle, E

    2002-04-01

    The activities of SCK-CEN's Reactor Materials Research Department for 2001 are summarised. The objectives of the department are: (1) to evaluate the integrity and behaviour of structural materials used in nuclear power industry; (2) to conduct research to unravel and understand the parameters that determine the material behaviour under or after irradiation; (3) to contribute to the interpretation, the modelling of the material behaviour and to develop and assess strategies for optimum life management of nuclear power plant components. The programmes within the department are focussed on studies concerning (1) Irradiation Assisted Stress Corrosion Cracking (IASCC); (2) nuclear fuel; and (3) Reactor Pressure Vessel Steel.

  17. Reactor Materials Research

    International Nuclear Information System (INIS)

    Van Walle, E.

    2002-01-01

    The activities of SCK-CEN's Reactor Materials Research Department for 2001 are summarised. The objectives of the department are: (1) to evaluate the integrity and behaviour of structural materials used in nuclear power industry; (2) to conduct research to unravel and understand the parameters that determine the material behaviour under or after irradiation; (3) to contribute to the interpretation, the modelling of the material behaviour and to develop and assess strategies for optimum life management of nuclear power plant components. The programmes within the department are focussed on studies concerning (1) Irradiation Assisted Stress Corrosion Cracking (IASCC); (2) nuclear fuel; and (3) Reactor Pressure Vessel Steel

  18. Results of environmental radiation monitoring and meteorology measurements (material prepared for obtaining the licence for RA reactor experimental operation)

    International Nuclear Information System (INIS)

    1980-10-01

    According to the demands for obtaining the licence for restarting the Ra reactor and the experimental operation this document includes the radiation monitoring measured data in the working space and environment of the RA reactor, i.e. Boris Kidric Institute. The meteorology measured data are included as well. All the measurements are performed according to the radiation protection program applied actually from the first reactor start-up at the end of 1959 [sr

  19. Nuclear Reactor RA Safety Report, Vol. 14, Safety protection measures; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 14, Sigurnosne zastitne mere

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    Nuclear reactor accidents can be caused by three type of errors: failure of reactor components including (1) control and measuring instrumentation, (2) errors in operation procedure, (3) natural disasters. Safety during reactor operation are secured during its design and construction and later during operation. Both construction and administrative procedures are applied to attain safe operation. Technical safety features include fission product barriers, fuel elements cladding, primary reactor components (reactor vessel, primary cooling pipes, heat exchanger in the pump), reactor building. Safety system is the system for safe reactor shutdown and auxiliary safety system. RA reactor operating regulations and instructions are administrative acts applied to avoid possible human error caused accidents. [Serbo-Croat] Uzroci udesa na nuklearnim reaktorima mogu se svrstati u jednu od sledece tri grupe: (1) otkaz pojedinih delova opreme, ukljucujuci mernu i kontrolnu instrumentaciju, (2) greske u pogonu i eksploataciji, (3) prirodne nepogode, katastrofe. Bezbednost i sigurnost u radu nuklearnog reaktora osiguravaju se odredjenim merama koje se preduzimaju pri njegovoj izgradnji i kasnije njegovoj elsploataciji. Te mere se mogu podeliti u sledece dve kategorije: (1) mere tehnicke zastite, i (2) administrativne mere. Mere tehnicke zastite sastoje se od barijere fissionih produkata, kosuljice gorivnih elemenata, primarnog kola reaktora RA (reaktorski sud, cevovod primarnog kola, toploizmenjivac u pimpi), zgrada reaktora. Sigurnosni sistem cini sistem za sigurnosno zaustavljanje reaktora i pomocni sigurnosni sistem. Kroz odgovarajuce propise i uputstva za rad na reaktoru RA primenjene su administrativne mere neophodne za sprecavanje udes koji bi mogao nastati kao posledica ljudskog faktora.

  20. Ra reactor operation plan for 1976 - Annex 6; Prilog 6 - Plan rada reaktora RA za 1976. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    Contrary to previous years the RA reactor operation plan for 1976 is conditioned by more uncertainties than ever for the following reasons. It is planned for February to repair the components in order to eliminate the consequences of leaking from the vertical experimental channel VK-4 which happened in december 1975. Apart from this, measurements related to transfer of the core to highly enriched fuel under minimum power are foreseen to be performed in February. In April, it would be indispensable to locate the point of He gas leaking and its prevention. Core transfer to highly enriched fuel is planned for April for testing of the fuel elements under operating conditions and step by step increase of the power density up to the nominal power. Complete plan for core transfer would be available by the end of February 1976. It is planned to make-up for the mentioned delays from May-December 1976. [Serbo-Croat] Za razliku od prethodnih godina izrada plana rada reaktora RA za 1976. godinu vezana je za mnogo vise neizvesnosti nego ikada ranije iz sledecih razloga. U februaru se vrsi remont opreme i uklanjanja posledica procurivanja vertikalnog eksperimentalog kanala VK-4, koje se dogodilo decembra 1975. Sem toga u februaru se vrse merenja na minimalnim snagama u sklopu priprema za prelazak na novo gorivo. U aprilu ce biti neophodno lociranje mesta gde istice He gas kao i otklanjanje uzroka ovog curenja. Planirano je da se u aprilu ubaci novo gorivo u jezgro u cilju testiranja pod radnim uslovima uz postepeno povecanje snage do nominalne. Planirano je da se smanjeni obim rada usled navedenih uslova nadoknadi u potpunosti u periodu maj-decembar 1976.

  1. Radiation protection personnel training in Research Reactors

    International Nuclear Information System (INIS)

    Fernandez, Carlos Dario; Lorenzo, Nestor Pedro de

    1996-01-01

    The RA-6 research reactor is considering the main laboratory in the training of different groups related with radiological protection. The methodology applied to several courses over 15 years of experience is shown in this work. The reactor is also involved in the construction, design, start-up and sell of different installation outside Argentina for this reason several theoretical and practical courses had been developed. The acquired experience obtained is shown in this paper and the main purpose is to show the requirements to be taken into account for every group (subjects, goals, on-job training, etc) (author)

  2. Dosimetry and radiation protection at the RA reactor in 1972; Dozimetrija i zastita kod reaktora RA u 1972. godini

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M M [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1973-07-01

    Dosimetry results collected within radiation protection of the RA reactor during this year are presented. Neutron and gamma radiation data were measured at characteristic control points. Statistical review of the total number of measurement is given as well. The report includes contents of radioactive gasses and aerosols in the air, as well as the contamination data of surfaces, clothes and uncovered body parts of the personnel. Particular accident which occurred during dismantling of the experimental channel containing the capsule with the new fuel element was analysed. This accident occurred at the RA reactor at the beginning of this year. It was found that that the maximum individual external dose was 2.2 R, and that only one individual was exposed to this dose. About 15% of the personnel was exposed to doses between 1 and 2 R, the remaining 85% was exposed to doses less than 1 R. Base on the frequency of activities undertaken in the contaminated regions, safety and control measures and expected internal exposure of the personnel, it was evaluated that the internal exposure could be neglected compared to the external exposure of the personnel. Prikazani su rezultati sakupljani u toku godine u okviru dozimetrijske kontrole i zastite kod reaktora. Dati su podaci o nivoima neutrona i gama zracenja na karakteristicnim kontrolnim mestima, kao i statisticki pregledi ukupnog broja merenja. Navedeni su rezultati merenja sadrzaja radioaktivnih gasova i aerosola u vazduhu, kao i stepena kontaminacije povrsina, odece i otkrivenih delova tela radnog osoblja. Analiziran je specifican akcident koji se odigrao na reaktoru pocetkom godine, pri demontazi eksperimentalnog kanala sa kapsulom novog gorivog elementa. Na kraju, izlozena je analiza ozracivanja radnog osoblja. Konstatovano je da je maksimalna individualna doza spoljasnjeg ozracivanja bila 2,2 (R), i da je ovoj dozi bilo izlozeno samo jedno lice. Oko 15% osoblja bilo je izlozeno dozama izmedju 1 i 2 (R), a ostalih 85

  3. Design and construction of demineralized water production and maintenance system for RA-O nuclear reactor

    International Nuclear Information System (INIS)

    Rumis, D.; Martin, H.R.

    1990-01-01

    The normal operation of zero power RA-O Nuclear Reactor requires a production and maintenance of demineralized water system. This system was designed and built-up during the works for actualization, upgrading and new start up at Cordoba National University of this facility. This paper comments the relevant aspects about the didactical purpose of that system and the details considered for training and practices with it. Similarly, considerations about solids wastes and effluents treatment are discussed. (Author)

  4. Power measurement of the RA-3 reactor using the neutron noise technique and 16N

    International Nuclear Information System (INIS)

    Gomez, Angel

    2003-01-01

    This work describes a measurement method based on the neutron noise technique which is used for determining the relation between the power and the currents of two ionization chambers. These chambers are sensitive to the gamma radiation from the 16 N decay produced in the RA-3 reactor core. The power during operation is obtained from the calibration factors by measuring those currents. As this calibration factors depend on the cooler flow that circulates in the reactor core and in the 16 N measuring system, an estimator, that is a function of the ratio of this currents, is proposed in order to detect flow changes. (author)

  5. Description of the control and safety systems of the RA reactor

    International Nuclear Information System (INIS)

    Popovic, B.; Pesic, M.

    1962-01-01

    This report contains detailed description and scheme of the control and safety system of the RA reactor. It consists of interconnected five systems: for automated regulation; compensation rods; safety rods; power density measurement device; period meter; automated D 2 O level meter in the core. Automated regulation system is divided into two parts: basic system for reactor operation regime at power from 10kW - 10 MW and precise regulation system for operation at set-up power level up to 10 kW which is used occasionally

  6. Operational report, basics of the preliminary project for reconstruction of the RA reactor ventilation system

    International Nuclear Information System (INIS)

    Martinc, R.

    1982-01-01

    This report presents the summary of results needed for designing the reconstruction of the RA reactor ventilation system. The final complete report will published later, including results of possible additional analyses according to the needs of main detailed project. Due to the size of the facility the need of filters for particulates is expected in systems V-1 and V-2, as well as revision of the system V-4. Adsorption filters are not needed in case of operation under regular working conditions. It would be favorable, but not indispensable to construct an adsorption filter that could be used occasionally at the input of V-2 system under the upper water shielding. This filter would be switched on when dehermetization of the reactor is planned and increased radioactivity is indicated in the gas system or experimental space of the RA reactor as well as in case of fuel elements failure. The aim of applying filters is shortening the time these elements would spend in the hermetized reactor i.e. their fast removal from the reactor. It is indispensable to build-in 'emergency' highly efficient adsorption filters in the V-2 system which would be switched on in case of accidents that would cause fuel elements meltdown (with simultaneous accident dehermetization of the heavy water system) [sr

  7. The design of a fuel element for the RA-3 reactor (Ezeiza Atomic Center)

    International Nuclear Information System (INIS)

    Agueda, Horacio C.; Estevez, Esteban; Gerding, Jose R.; Markiewicz, Mario E.

    2003-01-01

    Some features of the mechanical design of the low enrichment fuel element for the RA-3 reactor are described, with emphasis in those aspects of the original design that have been modified considering the experience acquired in the design of other fuel elements. The proposed modification is based fundamentally on the replacement of all welded joints by screwed joints, which facilitates the manufacture of the fuel element, avoiding the distortions produced by the welds used at present and contributing to the fulfillment of the foreseen tolerances. A basic characteristic of this design is a careful manufacture of the fuel element's structural components in order to assure an assembling of the fuel element that fulfills the tolerances intrinsically required. The fuel is designed for the RA-3 reactor and uses U 3 O 8 or U 3 Si 2 as carrying phase of the fissile material with an enrichment of 19.70% of 235 U. The design verification was performed by analytical and numerical methods, and is supported by testing of materials in laboratory, hydrodynamics tests and performance evaluations of the fuel elements in the RA-3 reactor. (author)

  8. Fast breeder reactor research

    International Nuclear Information System (INIS)

    1975-01-01

    reactors of the future, the body of research aimed at developing liquid metal cooled fast reactors, national plans for work in 1976 on developing fast reactors - these were some of the topics discussed in connection with the national programmes. The development of power reactors involves a wide range of problems in the fields of nuclear and reactor physics, the thermophysics, chemistry, physics and technology of the cooling system, structural materials and nuclear fuel, the fabrication of reliable fuel elements and operating equipment, reactor monitoring and control, spent fuel reprocessing, the economics of constructing fast power reactors, nuclear safety, etc. The IWGFR, as at previous meetings, therefore paid great attention to the matter of holding international specialists' meetings. The working group recommended that the IAEA should organize the following IWGFR meetings in 1976: (1) In-Service Inspection and Monitoring (Bensberg, FRG, March 1976). (2) Cavitation in Sodium and Studies of Analogy with Water as Compared to Sodium (Cadarache, France, April 1976). (3) High Temperature Structural Design Technology (United States, May 1976) (4) Aerosol Formation, Vapour Deposits and Sodium Vapour Trapping (France, September-December 1976). The Group welcomed the IAEA's proposal to hold specialists' meetings on 'Fast Reactor Instrumentation' and 'Fuel Reprocessing and Recycling Techniques' within the framework of the Agency's programme of working groups in 1976. After discussing questions of co-ordinating and organizing international conferences on fast reactors, the IWGFR agreed to send representatives to the joint meeting of the American Nuclear Society and the American Institute of Metallurgical Engineers on 'Liquid Metal Technology', to be held at Champion, Pennsylvania, U.S.A. from 3-6 May 1976, and recommended that the IAEA should organize an international symposium on the 'Design, Construction and Operating Experience of Demonstration Fast Power Reactors' at Bologna

  9. Regulations for the maintenance division of the RA reactor, Annex 6; Prilog 6 - Pravilnik poslovanja Odelenja odrzavanja i remonta reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Badrljica, R [Reaktor RA, Odelenje odrzavanja, Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1965-12-15

    The regulations for the Division of reactor maintenance include the organizational scheme, tasks of the Division, and operation procedures for all the staff members. [Serbo-Croat] Pravilnik o radu Odelenja za odrzavanje reaktora RA sadrzi opis organizacione strukture sluzbe, zadataka Odelenja, organizacije rada, nacin poslovanja za sve saradnike Odelenja.

  10. Annex 1 - Task 08/12 final report, testing the RA reactor fuel element; Prilog 1 - Zavrsni izvestaj o podzadatku 08/12, Ispitivanje gorivnog elementa reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Mihajlovic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    Testing of the RA reactor fuel element is presented in Annex 2 and 3 of this report. Annex 2 describes the construction of individual parts of the fuel elements and the results of the chemical analyses. Annex 3 shows the microstructure of uranium in the fuel element.

  11. Thermohydraulic calculations in rectangular channels for RA-6 type reactors with transition regime

    International Nuclear Information System (INIS)

    Sillin, N; Vertullo, A.; Masson, V.; Hilal, R

    2009-01-01

    In August 2000 and within the framework of the RA-6 core conversion from high to low enrichment (20%), a preliminary analysis was performed to evaluate the maximum power that the reactor could operate with the new kernel without makeing substantial changes. This meant keeping intact, for example, the concrete shield of the pool and the nucleus inlet and outlet pipes embedded in the walls. Preliminary results indicated that for these boundary conditions a maximum power of about 3 MWt could be achieved. In August 2005 the project was resumed and new calculations performed taking as a starting point the ECBE plate fuel element(U3O8-Al). A core was developed with cooling channle widths of 2.6 mm for the control fuel elements and 2.7 mm for standard fuel elements. The thermo-hydraulic calculation puts in evidence that coolant flow into the core was in the transitional regime for the vast majority of configurations. While TERMIC code, used for thermo-hydraulic design, has been extensively tested and validated for use in research reactors under turbulent and laminar flows, this is not so for transition conditions. The transition regime is strongly dependent on conditions such as flow inlet characteristics, channel geometry, etc.. and therefore there are no reliable correlations for general use. For this reason we found it convenient to carry out experiments simulating the working conditions in order to adjust the code results with experimental data. In the present work we show the experimental results, the simulation of the experiences using the TERMIC code, and the adjustments made to the correlations used by the code so that it can be applied to the thermo-hydraulic design of the new core. [es

  12. Experience in utilizing research reactors in Yugoslavia

    Energy Technology Data Exchange (ETDEWEB)

    Pop-Jordanov, J.; Raisic, N. [Boris Kidric Institute of Nuclear Sciences VINCA, Belgrade (Yugoslavia); Copic, M.; Gabrovsek, Z. [Jozef Stefan Institute Ljubljana (Yugoslavia)

    1972-07-01

    The nuclear institutes in Yugoslavia possess three research reactors. Since 1958, two heavy-water reactors have been in operation at the 'Boris Kidric' Institute, a zero-power reactor RB and a 6. 5-MW reactor RA. At the Jozef Stefan Institute, a 250-kW TRIGA Mark II reactor has been operating since 1966. All reactors are equipped with the necessary experimental facilities. The main activities based on these reactors are: (1) fundamental research in solid-state and nuclear physics; (2) R and D activities related to nuclear power program; and (3) radioisotope production. In fundamental physics, inelastic neutron scattering and diffraction phenomena are studied by means of the neutron beam tubes and applied to investigations of the structures of solids and liquids. Valuable results are also obtained in n - γ reaction studies. Experiments connected with the fuel -element development program, owing to the characteristics of the existing reactors, are limited to determination of the fuel element parameters, to studies on the purity of uranium, and to a small number of capsule irradiations. All three reactors are also used for the verification of different methods applied in the analysis of power reactors, particularly concerning neutron flux distributions, the optimization of reactor core configurations and the shielding effects. An appreciable irradiation space in the reactors is reserved for isotope production. Fruitful international co-operation has been established in all these activities, on the basis of either bilateral or multilateral arrangements. The paper gives a critical analysis of the utilization of research reactors in a developing country such as Yugoslavia. The investments in and the operational costs of research reactors are compared with the benefits obtained in different areas of reactor application. The impact on the general scientific, technological and educational level in the country is also considered. In particular, an attempt is made ro

  13. Experience in utilizing research reactors in Yugoslavia

    International Nuclear Information System (INIS)

    Pop-Jordanov, J.; Raisic, N.; Copic, M.; Gabrovsek, Z.

    1972-01-01

    The nuclear institutes in Yugoslavia possess three research reactors. Since 1958, two heavy-water reactors have been in operation at the 'Boris Kidric' Institute, a zero-power reactor RB and a 6. 5-MW reactor RA. At the Jozef Stefan Institute, a 250-kW TRIGA Mark II reactor has been operating since 1966. All reactors are equipped with the necessary experimental facilities. The main activities based on these reactors are: (1) fundamental research in solid-state and nuclear physics; (2) R and D activities related to nuclear power program; and (3) radioisotope production. In fundamental physics, inelastic neutron scattering and diffraction phenomena are studied by means of the neutron beam tubes and applied to investigations of the structures of solids and liquids. Valuable results are also obtained in n - γ reaction studies. Experiments connected with the fuel -element development program, owing to the characteristics of the existing reactors, are limited to determination of the fuel element parameters, to studies on the purity of uranium, and to a small number of capsule irradiations. All three reactors are also used for the verification of different methods applied in the analysis of power reactors, particularly concerning neutron flux distributions, the optimization of reactor core configurations and the shielding effects. An appreciable irradiation space in the reactors is reserved for isotope production. Fruitful international co-operation has been established in all these activities, on the basis of either bilateral or multilateral arrangements. The paper gives a critical analysis of the utilization of research reactors in a developing country such as Yugoslavia. The investments in and the operational costs of research reactors are compared with the benefits obtained in different areas of reactor application. The impact on the general scientific, technological and educational level in the country is also considered. In particular, an attempt is made ro

  14. The market for research reactors

    International Nuclear Information System (INIS)

    Roegler, H.J.

    1986-01-01

    The assay deals with some basic questions if there is an international market for research reactors at all, which influencing factors affect this market, and if research reactors have any effects on the future market for nuclear engineering. (UA) [de

  15. Research reactors and materials testing

    International Nuclear Information System (INIS)

    Vidal, H.

    1986-01-01

    Research reactors can be classified in three main groups according to the moderator which is used. Their technical characteristics are given and the three most recent research and materials testing reactors are described: OSIRIS, ORPHEE and the high-flux reactor of Grenoble. The utilization of research reactors is reviewed in four fields of activity: training, fundamental or applied research and production (eg. radioisotopes) [fr

  16. Nuclear Reactor RA Safety Report, Vol. 5, Reactor cooling systems; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 5, Hladjenje reaktora i pripadajuci sistemi

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    RA reactor cooling system enable cooling during normal operation and under possible accidental conditions and include: technical water system, heavy water system, helium gas system, system for heavy water purification and emergency cooling system. Primary cooling system is a closed heavy water circulation system. Heavy water system is designed to enable permanent circulation and twofold function of heavy water. In the upward direction of cooling it has a coolant role and in the downward direction it is the moderator. Separate part of the primary coolant loop is the system for heavy water purification. This system uses distillation and ion exchange processes. [Serbo-Croat] Sistemi za hladjenje reaktora RA obezbedjuju hladjenje u svim rezimima eksploatacije i potenijalno udesnim satnjim i obuhvataju: sistem tehnicke vode, sistem teske vode, gasni sistem helijuma, sistem za preciscavanje teske vode i sistem za akcidentalno hladjenje. Primarni sistem za hladjenje je zatvoreni cirkulacioni sistem teske vode. Specificnost sistema teske vode vezana je za neprekidnost cirkulacije i razlicite funkcije teske vode. U uzlaznom strujanju, teske vode ima ulogu hladioca a u silaznom ulogu moderatora. Poseban deo primarnog sistema predstavlja sistem za preciscavanje teske vode. Ovaj sistem koristi destilacioni i jonoizmenjivacki postupak.

  17. Radiation dosimetry of the reactor RA at Vinca, Measurements by isothermal calorimeter

    Energy Technology Data Exchange (ETDEWEB)

    Radak, B; Markovic, V; Draganic, I [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    1. In this work we have made attempts to: - analyze the problems of reactor radiation dosimetry; - describe the solutions of this problem by the calorimetric method; - present our results of measurements of the reactor RA at Vinca, and to describe the method, apparatus and measuring equipment used. 2. Use was made of the isothermal calorimeter with thermistors which measured the absorbed dose rates within the range 10{sup 4}-10{sup 6} rad/h, with an accuracy of 2-5%. It was shown that the reactor radiation in which the thermal neutron flux is up to the order of magnitude 10{sup 12} n/cm{sup 2}/sec, and the integral thermal neutron flux up to about 10{sup 16} n/cm{sup 2} exerts no significant influence upon the working characteristics out of the thermistors used. 3. Determination was made of the absorbed dose distribution into the gamma-ray and the neutron contribution. For this purpose we used 3 materials: ordinary water, heavy water and graphite. 4. Measurements were carried out in two vertical experimental holes 'VK-5' and 'VK-6' of the reactor RA at several heights. It has been shown that the absorbed dose height distribution agrees well with the thermal flux distribution curve, although the relations of the absorbed doses of the two holes are not in accordance with the corresponding thermal flux relations (author)

  18. Radiation dosimetry of the reactor RA at Vinca, Measurements by isothermal calorimeter

    Energy Technology Data Exchange (ETDEWEB)

    Radak, B; Markovic, V; Draganic, I [Institute of Nuclear Sciences Boris Kidric, Department of radiation chemistry, Vinca, Beograd (Serbia and Montenegro)

    1961-10-15

    In this work we have made attempts to: analyze the problems of reactor radiation dosimetry; describe the solution of this problem by the calorimetric method; present our results of measurements on the reactor RA at Vinca, and to describe the method, apparatus and measuring equipment used. Use was made of the isothermal calorimeter with thermistors which measured the absorbed dose rates within the range 10{sup 4}-10{sup 6} rad/h, with an accuracy of 2-5%. It was shown that the reactor radiation in which the thermal neutron flux is up to the order of magnitude 10{sup 12} n/cm{sup 2}/sec, and the integral thermal neutron flux up to about 10{sup 16} n/cm{sup 2} exerts no significant influence upon the working characteristics of the thermistors used. Determination was made of the absorbed dose distribution into the gamma-ray and the neutron contribution. For this purpose we used 3 materials: ordinary water, heavy water and graphite. Measurements were carried out in two vertical experimental holes 'VK-5' and 'VK-9' of the reactor RA at several heights. It has been shown that the absorbed dose height distribution agrees well with the thermal flux distribution curve, although the relations of the absorbed doses of the two holes are not in accordance with the corresponding thermal flux relations (author)

  19. Radiation dosimetry of the reactor RA at Vinca, Measurements by isothermal calorimeter

    International Nuclear Information System (INIS)

    Radak, B.; Markovic, V.; Draganic, I.

    1961-01-01

    1. In this work we have made attempts to: - analyze the problems of reactor radiation dosimetry; - describe the solutions of this problem by the calorimetric method; - present our results of measurements of the reactor RA at Vinca, and to describe the method, apparatus and measuring equipment used. 2. Use was made of the isothermal calorimeter with thermistors which measured the absorbed dose rates within the range 10 4 -10 6 rad/h, with an accuracy of 2-5%. It was shown that the reactor radiation in which the thermal neutron flux is up to the order of magnitude 10 12 n/cm 2 /sec, and the integral thermal neutron flux up to about 10 16 n/cm 2 exerts no significant influence upon the working characteristics out of the thermistors used. 3. Determination was made of the absorbed dose distribution into the gamma-ray and the neutron contribution. For this purpose we used 3 materials: ordinary water, heavy water and graphite. 4. Measurements were carried out in two vertical experimental holes 'VK-5' and 'VK-6' of the reactor RA at several heights. It has been shown that the absorbed dose height distribution agrees well with the thermal flux distribution curve, although the relations of the absorbed doses of the two holes are not in accordance with the corresponding thermal flux relations (author)

  20. Radiation dosimetry of the reactor RA at Vinca, Measurements by isothermal calorimeter

    International Nuclear Information System (INIS)

    Radak, B.; Markovic, V.; Draganic, I.

    1961-01-01

    In this work we have made attempts to: analyze the problems of reactor radiation dosimetry; describe the solution of this problem by the calorimetric method; present our results of measurements on the reactor RA at Vinca, and to describe the method, apparatus and measuring equipment used. Use was made of the isothermal calorimeter with thermistors which measured the absorbed dose rates within the range 10 4 -10 6 rad/h, with an accuracy of 2-5%. It was shown that the reactor radiation in which the thermal neutron flux is up to the order of magnitude 10 12 n/cm 2 /sec, and the integral thermal neutron flux up to about 10 16 n/cm 2 exerts no significant influence upon the working characteristics of the thermistors used. Determination was made of the absorbed dose distribution into the gamma-ray and the neutron contribution. For this purpose we used 3 materials: ordinary water, heavy water and graphite. Measurements were carried out in two vertical experimental holes 'VK-5' and 'VK-9' of the reactor RA at several heights. It has been shown that the absorbed dose height distribution agrees well with the thermal flux distribution curve, although the relations of the absorbed doses of the two holes are not in accordance with the corresponding thermal flux relations (author)

  1. The analysis of the RA reactor irradiated fuel cooling in the spent fuel pool; Analiza hladjenja ozracenog goriva u bazenu za odlaganje reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Vrhovac, M; Afgan, N; Spasojevic, D; Jovic, V [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1985-07-01

    According to the RA reactor exploitation plan the great quantity of the irradiated spent fuel will be disposed in the reactor spent fuel pool after each reactor campaign which will including the present spent fuel inventory increase the residual power level in the pool and will soon cause the pool capacity shortage. To enable the analysis of the irradiated fuel cooling the pool and characteristic spent fuel canister temperature distribution at the residual power maximum was done. The results obtained under the various spent fuel cooling conditions in the pit indicate the normal spent fuel thermal load even in the most inconvenient cooling conditions. (author)

  2. Feasibility of ISO 14000 certification for the RA-6 reactor of the Bariloche Atomic Center

    International Nuclear Information System (INIS)

    Gho, Carlos J.

    2003-01-01

    The strengths and weaknesses of a proposal to set up a System for the Environmental Management of RA-6 reactor are reviewed. With this aim: The facility, its surroundings, its institutional frame, and the links of both the National Atomic Energy Commission and the Bariloche Atomic Center with the environmental issues are described. The RA-6 past and present regarding the environment is analyzed. The existence of an abundant documentation on procedures and manuals for administrative and technical management, as well as records of environmental behavior is determined. A summary is made of the work done with the staff in order to assess their motivation to develop this type of initiative, and their degree of knowledge and awareness of environmental issues. It is worthy to point out the high professional training of the RA-6 staff. This information is analyzed under the point of view of ISO 14001 both text and philosophy. It is shown that there exist important strengths that enable to face a concrete project, and that the weaknesses are few, most of them can be overcome somehow easily. The opportunity is remarkable. Conclusion is made that RA-6 is not only in optimal conditions to face successfully the implementation of an Environmental Management System, but it has already a rudimentary one

  3. Research and materials irradiation reactors

    International Nuclear Information System (INIS)

    Ballagny, A.; Guigon, B.

    2004-01-01

    Devoted to the fundamental and applied research on materials irradiation, research reactors are nuclear installations where high neutrons flux are maintained. After a general presentation of the research reactors in the world and more specifically in France, this document presents the heavy water cooled reactors and the water cooled reactors. The third part explains the technical characteristics, thermal power, neutron flux, operating and details the Osiris, the RHF (high flux reactor), the Orphee and the Jules Horowitz reactors. The last part deals with the possible utilizations. (A.L.B.)

  4. RA-6 reactor's probabilistic safety evaluation. Identification and selection of starting events

    International Nuclear Information System (INIS)

    Kay, J.; Chiossi, C.; Felizia, E.; Vallerga, H.; Kalejman, G.; Navarro, R.; Caruso, G.J.

    1987-01-01

    A summary of the 'Identification and selection of starting events' stage of the previous probabilistic safety evaluation of RA-6 reactor is presented. This evaluation was performed to verify if the safety criteria required for the licensing of RA-6 are met and to promote the diffusion of its meaning and usefulness with educational purposes. At this stage the starting events of RA-6 are determined and the probability that such events occur is calculated. The identification and selection of starting events is performed in two steps: determination of proposed starting events and determination of postulated starting events. The proposed starting events are determined by means of the master logic diagram (MLD) method, while the postulated starting events are obtained by grouping the proposed starting events. The simplifying hypothesis required for the application of MLD to the reactor are also formulated. The probability that the proposed and postulated starting events occur is afterwards calculated, adopting different fault models, in accordance with the nature of events that are considered. Conservative hypothesis on the characteristics of these events and the uncertainty of parameter values of those models are also formulated. The numerical values of the above mentioned probabilities are obtained by giving the parameters suitable values that are extracted from specialized publications. (Author)

  5. Applications of Research Reactors

    International Nuclear Information System (INIS)

    2014-01-01

    One of the IAEA's statutory objectives is to 'seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world.' One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish 'standards of safety for protection of health and minimization of danger to life and property'. The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. The purpose of the earlier publication, The Application of Research Reactors, IAEA-TECDOC-1234, was to present descriptions of the typical forms of research reactor use. The necessary criteria to enable an application to be performed were outlined for each one, and, in many cases, the minimum as well as the desirable requirements were given. This revision of the publication over a decade later maintains the original purpose and now specifically takes into account the changes in service requirements demanded by the relevant stakeholders. In particular, the significant improvements in

  6. Practical experience for liquid radioactive waste treatment from spent fuel storage pool on RA reactor in Vinca Institute

    International Nuclear Information System (INIS)

    Plecas, I.; Pavlovic, R.; Pavlovic, S.

    2002-01-01

    The present paper reports the results of the preliminary removal of sludge from the bottom of the spent fuel storage pool in the RA reactor, mechanical filtration of the pool water and sludge conditioning and storage. Yugoslavia is a country without a nuclear power plant (NPP) on its territory. The law which strictly forbids NPP construction is still valid, but, nevertheless we must handle and dispose radioactive waste. This is not only because of radwaste originating from the use of radioactive materials in medicine and industry, but also because of the waste generated by research in the Nuclear Sciences Institute Vinca. In the last forty years, in the Vinca Institute, as a result of two research reactors being operational, named RA and RB, and as a result of the application of radionuclides in medicine, industry and agriculture, radioactive waste materials of different levels of specific activity were generated. As a temporary solution, radioactive waste materials are stored in two interim storages. Radwaste materials that were immobilized in the inactive matrices are to be placed in concrete containers, for further manipulation and disposal.(author)

  7. Application of the neutron noise technique for measurement of reactivity for subcritical reactor RA-4

    International Nuclear Information System (INIS)

    Orso, J; Marenzana, A

    2012-01-01

    Reactor core RA-4 is divided into two parts that come together to start reactor. The reactor with core separate has the largest subcritical condition, this condition is more secure and therefore the reactor shutdown. In this paper measurements are made of the decay constant of the neutron prompt ' P ', using the α-Rossi and α-Feynman methods to calculate the reactivity of the reactor core for different positions. Both techniques are compared and reactivity is obtained for several position of the reactor core using the α-Rossi technical which is obtained a function that gives the reactivity depending on the separation of the core length. Both techniques are verified using a no multiplicative system. Reactivity values for different position of the core obtained by α-Rossi technique are: $[0 cm] = (-11+/-1) dollar, $[3 cm] = (-7+/-1) dollar, $[3.5 cm] (-5.5+/-0.8) dollar, $[4.2 cm] = (-3.8+/-0.3) dollar y $[4.5] = (-3.0+/-0.1) dollar (author)

  8. Mimic of OSU research reactor

    International Nuclear Information System (INIS)

    Lu, Hong; Miller, D.W.

    1991-01-01

    The Ohio State University research reactor (OSURR) is undergoing improvements in its research and educational capabilities. A computer-based digital data acquisition system, including a reactor system mimic, will be installed as part of these improvements. The system will monitor the reactor system parameters available to the reactor operator either in digital parameters available to the reactor operator either in digital or analog form. The system includes two computers. All the signals are sent to computer 1, which processes the data and sends the data through a serial port to computer 2 with a video graphics array VGA monitor, which is utilized to display the mimic system of the reactor

  9. RA reactor reactivity changes before refurbishment - Task 3.08/02; Zadatak 3.08/02 - Promene reaktivnosti reaktora RA do remonta

    Energy Technology Data Exchange (ETDEWEB)

    Dobrosavljevic, N; Strugar, P; Stamenkovic, S [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    From the the end of 1959, when the RA reactor started operation until January 1963 reactor was operated with the initial fuel batch of 56 fuel channels. After 310 MWd 68 fuel channels were added to the reactor core, and after further 357 MWd the core was filled up to the maximum of 88 fuel channels. Basic reactor parameters were systematically measured during two years of operation. This report covers the measurements concerned directly with the reactor operation: calibration of the control rods and their reactivity worths during operation, determining the total built-in reactivity excess and its change during burnup, determination of reactivity dependence on the temperature, xenon effect in the core.

  10. CER. Research reactors in France

    International Nuclear Information System (INIS)

    Estrade, Jerome

    2012-01-01

    Networking and the establishment of coalitions between research reactors are important to guarantee a high technical quality of the facility, to assure well educated and trained personnel, to harmonize the codes of standards and the know-ledge of the personnel as well as to enhance research reactor utilization. In addition to the European co-operation, country-specific working groups have been established for many years, such as the French research reactor Club d'Exploitants des Reacteurs (CER). It is the association of French research reactors representing all types of research reactors from zero power up to high flux reactors. CER was founded in 1990 and today a number of 14 research reactors meet twice a year for an exchange of experience. (orig.)

  11. Nuclear Reactor RA Safety Report, Vol. 15, Analysis of significant accidents; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 15, Analiza znacajnih akcidenata

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    Power excursions of the RA reactor a mathematical model of reactor kinetic behaviour was formulated to describe power and temperature coefficients for both reactor fuel and moderator. Computer code TM-1 was written for analysis of possible reactor accidents. Power excursions caused by uncontrolled control rod removal and heavy water flow into the central vertical experimental channel were analyzed. Accidents caused by fuel elements handling were discussed including possible fuel element damage. Although the probability for uncontrolled radioactive materials release into the environment is very low, this type of accidents are analyzed as well including the impact on the personnel and the environment. A separate chapter describes analysis of the loss of flow accident. Safety analysis covers the possible damage of the outer steel Ra reactor vessel and the water screens which are part of the water biological shield. [Serbo-Croat] Radi analize dinamickog ponasanja reaktora RA u toku ekskurzije snage formulisan je matematicki model koji opisuje promene snage i temperature goriva i moderatora. Za analizu predpostavljenih akcidenata realizovan je racunarski program TM-1. Analizirane su ekskurzije snage usled nekontrolisanog izvlacenja kontrolnih sipki i punjenja centralnog vertikalnog eksperimentalnog kanala teskom vodom. Analizirani su akcidenti pri rukovanju nuklearnim gorivom ukljucujuci ostecenje nuklearnog goriva. Iako je verovatnoca za nekontrolisano rasturanje radioaktivnog materijala mala, analizirani su i ovakvi moguci akcidenti koji mogu uticati kako na osoblje reaktora tako i na okolinu. Posebno poglavlje obuhvata analizu akcidenta u slucaju prestanka cirkulacije primarnog hladioca. Analiza sigurnosti reaktora obuhvata i moguce ostecenje spoljasnjeg celicnog suda reaktora RA kao i vodenih ekrana koji su deo vodenog bioloskog stita.

  12. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex A - Reactor applications

    International Nuclear Information System (INIS)

    Martinc, R.; Stanic, A.

    1985-01-01

    This document describes reactor operation from 1981 to 1985, including data about short term (shorter than 24 hours) and long term operation interruptions, as well as safety shutdown and reactor applications. During 1982, 1983 until July 1984 reactor was operated at 2 MW power according to the plan. Plan was not fulfilled in 1983 because deposits were noticed again, at the end of 1982, on the surface of fuel elements. Reactor was mainly used for neutron activation purposes and isotope production as source of neutrons for experimental purposes [sr

  13. Digital control of research reactors

    International Nuclear Information System (INIS)

    Crump, J.C. III.; Richards, W.J.; Heidel, C.C.

    1991-01-01

    Research reactors provide an important service for the nuclear industry. Developments and innovations used for research reactors can be later applied to larger power reactors. Their relatively inexpensive cost allows research reactors to be an excellent testing ground for the reactors of tomorrow. One area of current interest is digital control of research reactor systems. Digital control systems offer the benefits of implementation and superior system response over their analog counterparts. At McClellan Air Force Base in Sacramento, California, the Stationary Neutron Radiography System (SNRS) uses a 1,000-kW TRIGA reactor for neutron radiography and other nuclear research missions. The neutron radiography beams generated by the reactor are used to detect corrosion in aircraft structures. While the use of the reactor to inspect intact F-111 wings is in itself noteworthy, there is another area in which the facility has applied new technology: the instrumentation and control system (ICS). The ICS developed by General Atomics (GA) contains several new and significant items: (a) the ability to servocontrol on three rods, (b) the ability to produce a square wave, and (c) the use of a software configurator to tune parameters affected by the actual reactor core dynamics. These items will probably be present in most, if not all, future research reactors. They were developed with increased control and overall usefulness of the reactor in mind

  14. Research on background neutron of 226Ra γ source

    International Nuclear Information System (INIS)

    Ji Changsong

    1996-01-01

    This work studies the background neutron emission of 226 Ra γ source: the mechanism of resulting in background neutron is studied; a thesis that the (α, n) type reaction on Radium carriers Cl or Br is the main source of creating background neutron emission of 226 Ra γ source has been proposed and certificated; a proposal of substitution of Cl carrier by Br in radium source produced in China in order to reduce background neutron emission is put forward. A result to reduce the background neutron from 96.4 neutrons/4πsmgRa to 6.1 neutrons/4πsmgRa is obtained

  15. Continuous Monitoring of GAMMA Radiation Field in the Reactor RA Building

    International Nuclear Information System (INIS)

    Stalevski, T.

    2008-01-01

    This paper presents the system for continuos monitoring of gamma doze rate in the reactor RA building. Industrial (PC compatible) computer acquires analog signals from eight ionization chambers and eight analog signals from three BPH devices. Digital output interface is used for testing ionization chambers and BPH devices. Computer program for data analyzes and presentation is written in graphical programming language LabVIEW and enables monitoring of measured data in real time. Measured data can be monitored over local computer network, Internet and mobile devices using standard web browsers. (author)

  16. Absolute measurements of the fast neutron flux in the reactor RA

    Energy Technology Data Exchange (ETDEWEB)

    Berovic, N; Boreli, F; Dragin, R [Institute of Nuclear Sciences Boris Kidric, Department of physics, Vinca, Beograd (Serbia and Montenegro)

    1961-10-15

    The absolute neutron flux in the vertical VK-5 hole of the reactor RA was determined by using the {sup 27}Al (n, alpha) {sup 24}Na reaction, and by counting the {sup 24}Na - 2.5 MeV gamma line photopeak activity. A method for the determination of {sigma}{sub eff} as a mean value between the two large limiting cases of neutron spectra is used. The flux at the power level of 5 MW was found to be (2.5{+-}0.9){center_dot}10{sup 12}n/cm{sup 2}sec (author)

  17. Simple computational modeling for human extracorporeal irradiation using the BNCT facility of the RA-3 Reactor

    International Nuclear Information System (INIS)

    Farias, Ruben; Gonzalez, S.J.; Bellino, A.; Sztenjberg, M.; Pinto, J.; Thorp, Silvia I.; Gadan, M.; Pozzi, Emiliano; Schwint, Amanda E.; Heber, Elisa M.; Trivillin, V.A.; Zarza, Leandro G.; Estryk, Guillermo; Miller, M.; Bortolussi, S.; Soto, M.S.; Nigg, D.W.

    2009-01-01

    We present a simple computational model of the reactor RA-3 developed using Monte Carlo transport code MCNP. The model parameters are adjusted in order to reproduce experimental measured points in air and the source validation is performed in an acrylic phantom. Performance analysis is carried out using computational models of animal extracorporeal irradiation in liver and lung. Analysis is also performed inside a neutron shielded receptacle use for the irradiation of rats with a model of hepatic metastases.The computational model reproduces the experimental behavior in all the analyzed cases with a maximum difference of 10 percent. (author)

  18. Determination of the neutron spectrum at different locations in the Argentine RA-1 Reactor; Determinacion del espectro neutronico en distintas posiciones del reactor RA-1

    Energy Technology Data Exchange (ETDEWEB)

    Lerner, A M; Madariaga, M R [Autoridad Regulatoria Nuclear, Buenos Aires (Argentina)

    1999-12-31

    Full text: It is well known that the RA-1 reactor is used to irradiate different types of materials with neutrons. The Radio dosimetry Group (which belongs to the Nuclear Regulatory Authority) uses its fast column for the design, calibration and set up of criticality dosimeters as well as for a quick assessment of the dose to workers in case of an accident. With such purpose, Au(1), Au under Cd and In(2) foils were irradiated to estimate absolute thermal, epithermal and fast neutron fluxes at the irradiation location. The accuracy of this estimation is higher when the response to the present neutron spectrum of the different materials constituting the detectors is better known. This, in turn, requires the previous knowledge of such spectrum (a detailed energy dependence of neutron flux) at the analysed location. In this work a neutronic calculation is presented at the fast irradiation location. The whole calculation was carried out following two different methodologies, and considering a power of 40 kW. The reactor and its surroundings were represented by a simplified one-dimensional model, as a concentric cylindrical set of regions. Figures are drawn representing fast and thermal fluxes (with the cut at 0.4 eV) as a function of the distance to the core centre. The neutron flux (in n/cm{sup 2}sec.eV) as a function of energy is also shown at the fast irradiation location. Values of flux (in n/cm{sup 2}.sec.eV) are also provided as a function of energy in other typical locations, as well as the equivalent integrated flux values (in n/cm{sup 2}.sec). ((1) According to the reaction Au{sup 197}(n,{gamma})Au{sup 198}, having a cross section of {sigma}{sub 0}=98.8b for thermal neutrons. (2) According to the reaction In{sup 115}(n,n`)In{sup 115m}, with a cross section of some 70 mb for neutrons with energies above 1.2MeV). (author) [Espanol] Texto completo: Como se sabe, el reactor RA1 se utiliza para irradiar con neutrones distintos tipos de materiales. El grupo de

  19. RA Reactor operation and maintenance (I-IX), part VIII, Task 3.08/05, Decontamination of the reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    Permanent increase of radiation in the heavy water system was noticed during first three year of the RA reactor operation, even when the reactor was shutdown. It was found that there was no failure of the fuel element cladding. Radioactive cobalt was found in the heavy water which was rather strange. During repair of the heavy water system, it has been found that stellite was used for coating the heavy water pumps. Since stellite is a cobalt alloy, this could have been the source of radioactive cobalt in the heavy water. The stellite coating was damaged due to friction and particle of cobalt appeared in the coolant, they were activated since they were in the core. decontamination of the heavy water and the heavy water coolant loop was a must . Beside the detailed report on the contamination and decontamination of the heavy water system this volume includes 14 annexes describing the investigation of the event and the whole procedure of decontamination

  20. Semiconductor research with reactor neutrons

    International Nuclear Information System (INIS)

    Kimura, Itsuro

    1992-01-01

    Reactor neutrons play an important role for characterization of semiconductor materials as same as other advanced materials. On the other hand reactor neutrons bring about not only malignant irradiation effects called radiation damage, but also useful effects such as neutron transmutation doping and defect formation for opto-electronics. Research works on semiconductor materials with the reactor neutrons of the Kyoto University Reactor (KUR) are briefly reviewed. In this review, a stress is laid on the present author's works. (author)

  1. Operation, safety and utilization of the RA reactor in 1978 - Report; Prilog I - Rad, sigurnost i iskoriscenost reaktora RA u 1978. godini - Izvestaj

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Stanic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1978-12-15

    This report includes a review of work related to development of reactor operation capacities and increase of the RA reactor safety and economic operation. Statistical data about reactor operation and utilization are included as well. Introducing of the new 80% enriched fuel into the the reactor core enabled increase of the neutron flux, i.e. increase of its production capabilities. Safety and optimization analyses concerned with introduction of the new fuel have shown that the most safe and economic procedure was gradual introducing of the highly enriched fuel. This procedure was based on the concept of mixed core configuration with 2% and 80% enriched fuel elements. By applying this original concept the following significant savings were achieved: fuel elements savings, shortening of the annual period of reactor operation, savings in spent fuel casks, electric power savings, slowing down of heavy water degradation. [Serbo-Croat] Ovaj izvestaj sadrzi pregled o radu na razvoju eksploatacionih mogucnosti i povecanju sigurnosti i ekonomicnosti reaktora RA. Prilozeni su i statisticki podaci o radu i iskoriscenosti reaktora u 1978. godini. Uvodjenje novog 80% obogacenog goriva u jezgro reaktora omogucilo je povecanje neutronskog fluksa tj. povecanje njegovoh proizvodnih mogucnosti. Sigurnosne i optimizacione analize uvodjenja novog goriva pokazale su da je nasigurniji i najekonomicniji postupak postupnog uvodjenja visokoobogacenog goriva koji se zasniva na konceptu mesane resetke sa 2% i 80% obogacenim gorivom. Ovaj originalni koncept omogucio je da se postignu znatne ustede u gorivu, skracivanje godisnjeg rada reaktora, usteda sudova za odlaganje isluzenog goriva, usteda elektricne energije, usporavanje degradacije teske vode.

  2. Actions needed for RA reactor exploitation - I-IV, Part II, Design project VI-SA 1, Experimental loop for testing the EL-4 reactor fuel elements in the central vertical experimental channel of the RA reactor in Vinca

    International Nuclear Information System (INIS)

    Novakovic, M.

    1961-12-01

    The objective of installing the VISA-1 loop was testing the fuel elements of the EL-4 reactor. The fuel elements planned for testing are natural UO 2 with beryllium cladding, cooled by CO 2 under nominal pressure of 60 at and temperature 600 deg C. central vertical experimental channel of the RA reactor was chosen for installing a test loop cooled by CO 2 . This report contains the detailed design project of the testing loop with the control system and safety analysis of the planned experiment

  3. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex D - Report of the Mechanics Service

    International Nuclear Information System (INIS)

    Sulem, B.

    1985-01-01

    Service for mechanical components at the RA reactor includes: control and maintenance of utility components, mechanical workshop, hot cells and storage. Control and maintenance of main components covers: reactor core, heavy water system, technical water system, gas system. This service is responsible for the following auxiliary systems: transportation units; spent fuel storage pool; special ventilation system; personal protection appliances; hot cells. Maintenance of the reactor building, ventilation, heating, water supply, sewage, fire protection devices, gas and compressed air systems are included [sr

  4. Nuclear research reactors in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Cota, Anna Paula Leite; Mesquita, Amir Zacarias, E-mail: aplc@cdtn.b, E-mail: amir@cdtn.b [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2011-07-01

    The rising concerns about global warming and energy security have spurred a revival of interest in nuclear energy, giving birth to a 'nuclear power renaissance' in several countries in the world. Particularly in Brazil, in the recent years, the nuclear power renaissance can be seen in the actions that comprise its nuclear program, summarily the increase of the investments in nuclear research institutes and the government target to design and build the Brazilian Multipurpose research Reactor (BMR). In the last 50 years, Brazilian research reactors have been used for training, for producing radioisotopes to meet demands in industry and nuclear medicine, for miscellaneous irradiation services and for academic research. Moreover, the research reactors are used as laboratories to develop technologies in power reactors, which are evaluated today at around 450 worldwide. In this application, those reactors become more viable in relation to power reactors by the lowest cost, by the operation at low temperatures and, furthermore, by lower demand for nuclear fuel. In Brazil, four research reactors were installed: the IEA-R1 and the MB-01 reactors, both at the Instituto de Pesquisas Energeticas Nucleares (IPEN, Sao Paulo); the Argonauta, at the Instituto de Engenharia Nuclear (IEN, Rio de Janeiro) and the IPR-R1 TRIGA reactor, at the Centro de Desenvolvimento da Tecnologia Nuclear (CDTN, Belo Horizonte). The present paper intends to enumerate the characteristics of these reactors, their utilization and current academic research. Therefore, through this paper, we intend to collaborate on the BMR project. (author)

  5. Physical security at research reactors

    International Nuclear Information System (INIS)

    Clark, R.A.

    1977-01-01

    Of the 84 non-power research facilities licensed under 10 CFR Part 50, 73 are active (two test reactors, 68 research reactors and three critical facilities) and are required by 10 CFR Part 73.40 to provide physical protection against theft of SNM and against industrial sabotage. Each licensee has developed a security plan required by 10 CFR Part 50.34(c) to demonstrate the means of compliance with the applicable requirements of 10 CFR Part 73. In 1974, the Commission provided interim guidance for the organization and content of security plans for (a) test reactors, (b) medium power research and training reactors, and (c) low power research and training reactors. Eleven TRIGA reactors, with power levels greater than 250 kW and all other research and training reactors with power levels greater than 100 kW and less than or equal to 5,000 kW are designated as medium power research and training reactors. Thirteen TRIGA reactors with authorized power levels less than 250 kW are considered to be low power research and training reactors. Additional guidance for complying with the requirements of 73.50 and 73.60, if applicable, is provided in the Commission's Regulatory Guides. The Commission's Office of Inspection and Enforcement inspects each licensed facility to assure that an approved security plan is properly implemented with appropriate procedures and physical protection systems

  6. Nuclear research reactors in Brazil

    International Nuclear Information System (INIS)

    Cota, Anna Paula Leite; Mesquita, Amir Zacarias

    2011-01-01

    The rising concerns about global warming and energy security have spurred a revival of interest in nuclear energy, giving birth to a 'nuclear power renaissance' in several countries in the world. Particularly in Brazil, in the recent years, the nuclear power renaissance can be seen in the actions that comprise its nuclear program, summarily the increase of the investments in nuclear research institutes and the government target to design and build the Brazilian Multipurpose research Reactor (BMR). In the last 50 years, Brazilian research reactors have been used for training, for producing radioisotopes to meet demands in industry and nuclear medicine, for miscellaneous irradiation services and for academic research. Moreover, the research reactors are used as laboratories to develop technologies in power reactors, which are evaluated today at around 450 worldwide. In this application, those reactors become more viable in relation to power reactors by the lowest cost, by the operation at low temperatures and, furthermore, by lower demand for nuclear fuel. In Brazil, four research reactors were installed: the IEA-R1 and the MB-01 reactors, both at the Instituto de Pesquisas Energeticas Nucleares (IPEN, Sao Paulo); the Argonauta, at the Instituto de Engenharia Nuclear (IEN, Rio de Janeiro) and the IPR-R1 TRIGA reactor, at the Centro de Desenvolvimento da Tecnologia Nuclear (CDTN, Belo Horizonte). The present paper intends to enumerate the characteristics of these reactors, their utilization and current academic research. Therefore, through this paper, we intend to collaborate on the BMR project. (author)

  7. Spent fuel from RA reactor inspection of state and options for management

    International Nuclear Information System (INIS)

    Aden, V.G.; Bulkin, S. Yu.; Sokolov, A. V.; Matausek, M.V.; Vukadin, Z.

    2001-01-01

    About five thousand spent fuel elements from RA reactor have been stored for over 30 years in sealed aluminum barrels in the spent fuel storage pool. This way of storage does not provide complete information about the state of spent fuel elements or the medium inside the barrels, like pressure or radioactivity. The technology has been developed and the equipment has been manufactured to inspect the state of the spent fuel and to reduce eventual internal pressure inside the aluminum barrels. The realization of this technology was started in 1999 but due to political and financial difficulties was not completed. In September the year 2000 the work was restarted. Two different ways of RA reactor spent fuel elements preparation for transportation or long-term storage are considered: 'all fuel elements canning without leak-tightness testing' and 'all fuel elements leak-tightness testing'. It is believed that the first option offers several distinct advantages, which can be summarized as: greater reliability in the course of transportation or dry storage. Higher safety for workers. Lower expenditures for non-standard equipment manufacturing. Shorter duration of work. (author)

  8. Dry storage of MTR spent fuel from the Argentine radioisotope production reactor RA-3

    International Nuclear Information System (INIS)

    Di Marco, A.; Gillaume, E.J.; Ruggirello, G.; Zaweruchi, A.

    1996-01-01

    The nuclear fuel elements of the RA-3 reactor consist in 19 rectangular fuel plates held in position by two lateral structural plates. The whole assembly is coupled to the lower nozzles that fits in the reactor core grid. The inner plates are 1.5 mm thick, 70.5 mm wide and 655 mm long and the outer plates are 100 mm longer. The fuel plates are formed by a core of an AI-U alloy co-laminated between two plates of Al. Enrichment is 90% 235 U. After being extracted from the reactor, the fuel elements have been let to cool down in the reactor storage pool and finally moved to the storage facility. This facility is a grid of vertical underground channels connected by a piping system. The system is filled with processed and controlled water. At the present the storage capacity of the facility is near to be depleted and some indications of deterioration of the fuel elements has been detected. Due to the present status of the facility and the spent fuel stored there, a decision has been taken to proceed to modify the present underwater storage to dry storage. The project consist in: a) Decontamination and conditioning of the storage channels to prepare them for dry storage. b) Disassembly of the fuel elements in hot cells in order to can only the active fuel plates in an adequate tight canister. c) The remnant structural pieces will be treated as low level waste. (author). 10 figs

  9. Operation and maintenance of the RA reactor, Report on operation in 1966, task 6.08

    International Nuclear Information System (INIS)

    Milosevic, D. and others

    1966-12-01

    During 1966, RA reactor was operated at nominal power for 196 days and 28 days at lower power levels. The total production was 31015 MWh which is 3% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 644 users, of which 516 were from the Institute. This report contains detailed data about reactor power and experiments performed in 1966, and a chart showing discrepancies from the plan. data concerned about the utilization of reactor experimental channels are included as well. Total number of safety shutdowns was 37, of which 20 were caused by power cuts, 10 due to voltage instabilities, 4 due to human error and 3 due to failures of instrumentation. These data are compared to safety shutdown data of previous few years. There have been no accidents which could cause any significant effects. The incidents occurred during this year are described in detail. Detailed data concerning exposure of the personnel are part of this report

  10. Management of research reactor ageing

    International Nuclear Information System (INIS)

    1995-03-01

    As of December 1993, about one quarter of the operating research reactors were over 30 years old. The long life of research reactors has raised some concern amongst research reactor operators, regulators and, to some extent, the general public. The International Atomic Energy Agency commenced activities on the topic of research reactor ageing by appointing an internal working group in 1988 and convening a Consultants Meeting in 1989. The subject was also discussed at an international symposium and a regional seminar held in 1989 and 1992 respectively. A draft document incorporating information and experience exchanged at the above meetings was reviewed by a Technical Committee Meeting held in Vienna in 1992. The present TECDOC is the outcome of this meeting and contains recommendations, guidelines and information on the management of research reactor ageing, which should be used in conjunction with related publications of the IAEA Research Reactor Safety Programme, which are referenced throughout the text. This TECDOC will be of interest to operators and regulators involved with the safe operation of any type of research reactor to (a) understand the behaviour and influence of ageing mechanisms on the reactor structures, systems and components; (b) detect and assess the effect of ageing; (c) establish preventive and corrective measures to mitigate these effects; and (d) make decisions aimed at the safe and continued operation of a research reactor. 32 refs, tabs

  11. Management of research reactor ageing

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    As of December 1993, about one quarter of the operating research reactors were over 30 years old. The long life of research reactors has raised some concern amongst research reactor operators, regulators and, to some extent, the general public. The International Atomic Energy Agency commenced activities on the topic of research reactor ageing by appointing an internal working group in 1988 and convening a Consultants Meeting in 1989. The subject was also discussed at an international symposium and a regional seminar held in 1989 and 1992 respectively. A draft document incorporating information and experience exchanged at the above meetings was reviewed by a Technical Committee Meeting held in Vienna in 1992. The present TECDOC is the outcome of this meeting and contains recommendations, guidelines and information on the management of research reactor ageing, which should be used in conjunction with related publications of the IAEA Research Reactor Safety Programme, which are referenced throughout the text. This TECDOC will be of interest to operators and regulators involved with the safe operation of any type of research reactor to (a) understand the behaviour and influence of ageing mechanisms on the reactor structures, systems and components; (b) detect and assess the effect of ageing; (c) establish preventive and corrective measures to mitigate these effects; and (d) make decisions aimed at the safe and continued operation of a research reactor. 32 refs, tabs.

  12. Independent CO2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels, Task 2.50.05

    International Nuclear Information System (INIS)

    Stojic, M.; Pavicevic, M.

    1964-01-01

    This report contains the following volumes V and VI of the Project 'Independent CO 2 loop for cooling the samples irradiated in RA reactor vertical experimental channels': Design project of the dosimetry control system in the independent CO 2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels, and Safety report for the Independent CO 2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels [sr

  13. Tasks related to increase of RA reactor exploitation and experimental potential, 01. Designing the protection chamber in the RA reactor hall for handling the radioactive experimental equipment (I-II) Part II, Vol. II; Radovi na povecanju eksploatacionih i eksperimentalnih mogucnosti reaktora RA, 01. Projektovanje zastitne komore u hali reaktora RA za rad sa aktivnim eksperimentalnim uredjajima (I-II), II Deo, Album II

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-07-15

    This second volume of the project for construction of the protection chamber in the RA reactor hall for handling the radioactive devices includes the technical description of the chamber, calculation of the shielding wall thickness, bottom lead plate, horizontal stability of the chamber, cost estimation, and the engineering drawings.

  14. Improvement of research reactor sustainability

    International Nuclear Information System (INIS)

    Ciocanescu, M.; Paunoiu, C.; Toma, C.; Preda, M.; Ionila, M.

    2010-01-01

    The Research Reactors as is well known have numerous applications in a wide range of science technology, nuclear power development, medicine, to enumerate only the most important. The requirements of clients and stack-holders are fluctuating for the reasons out of control of Research Reactor Operating Organization, which may ensure with priority the safety of facility and nuclear installation. Sustainability of Research Reactor encompasses several aspects which finally are concentrated on safety of Research Reactor and economical aspects concerning operational expenses and income from external resources. Ensuring sustainability is a continuous, permanent activity and also it requests a strategic approach. The TRIGA - 14 MW Research Reactor detains a 30 years experience of safe utilization with good performance indicators. In the last 4 years the reactor benefited of a large investment project for modernization, thus ensuring the previous performances and opening new perspectives for power increase and for new applications. The previous core conversion from LEU to HEU fuel accomplished in 2006 ensures the utilization of reactor based on new qualified European supplier of TRIGA LEU fuel. Due to reduction of number of performed research reactors, the 14 MW TRIGA modernized reactor will play a significant role for the following two decades. (author)

  15. Operation, maintenance and utilization of the RA reactor, Annual report for 1980; Pogon, odrzavanje i eksploatacija reaktora RA, Izvestaj o radu u 1980. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1980-12-15

    During 1980 the activities of RA reactor staff was conducted in two directions: repair works and determination of the state of the existing equipment; and preparing and constructing additional equipment and completing the documentation needed to fulfill the new legal regulations. preparation of the existing equipment for future operation was finished, but construction of the additional equipment (according to the regulations) is not done at planned rate due to different reasons such as lack of budget, administration, import. This report includes a chapter devoted to the analysis of the operation difficulties that caused prohibition of reactor operation as well as difficulties in achievement of the planned activities for 1980. Data about financial issues are included as well. [Serbo-Croat] U toku 1980. godine rad OOUR-a Nuklearni reaktor RA odvijao se u dva smera: remontnim radovima i utvrdjivanju stanja postojece opreme i u pripremi i ugradnji potrebne dodatne opreme i kompletiranju neophodne dokumentacije prema novim zakonskim propisima. Priprema postojece opreme za rad je u potpunosti izvrsena, dok se projekti i ugradnja dodatne opreme (prema zakonskim obavezama) ne odvija potrebnom brzinom zbog raznih objektivnih razloga, kao nedostatak sredstava, odobrenja, uvoza. Ovaj izvestaj sadrzi poglavlje posveceno analizi teskoca u radu koje su dovele do zabrane rada reaktora, i teskoca u realizovanju plana rada u 1980. godini, ako i podatke o finansiranju projekta 'pogon, odrzavanje i eksploatacija reaktora RA'.

  16. Research reactor`s role in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Choi, C-O [Korea Atomic Energy Research Inst., Taejon (Korea, Republic of)

    1996-12-31

    After a TRIGA MARK-II was constructed in 1962, new research activity of a general nature, utilizing neutrons, prevailed in Korea. Radioisotopes produced from the MARK-II played a good role in the 1960`s in educating people as to what could be achieved by a neutron source. Because the research reactor had implanted neutron science in the country, another TRIGA MARK-III had to be constructed within 10 years after importing the first reactor, due to increased neutron demand from the nuclear community. With the sudden growth of nuclear power, however, the emphasis of research changed. For a while research activities were almost all oriented to nuclear power plant technology. However, the specifics of nuclear power plant technology created a need for a more highly capable research reactor like HANARO 30MWt. HANARO will perform well with irradiation testing and other nuclear programs in the future, including: production of key radioisotopes, doping of silicon by transmutation, neutron activation analysis, neutron beam experiments, cold neutron source. 3 tabs., 2 figs.

  17. Preparation of mandatory documentation before the start up of the RA-0 'zero power' nuclear reactor at Cordoba National University

    International Nuclear Information System (INIS)

    Martin, H.R.; Keil, W.M.; Pezzi, N.

    1991-01-01

    Before the start up of the RA-0 'zero power' nuclear reactor installed at Cordoba National University, it was necessary to send to the Regulatory Authority the mandatory documentation which is required in the licensing process. With the previous papers existing for the operation in the first years of the '70, a work program for the future operational training personnel was elaborated. Based on the Authority's applicable rules and the recommendations and with particular criteria originated in the working university conditions, the SAFETY report of RA-0 nuclear reactor was prepared. This paper describes the principal contents, items and documents involved in the safety report. (Author) [es

  18. Replacement research reactor for Australia

    International Nuclear Information System (INIS)

    Miller, Ross

    1998-01-01

    In 1992, the Australian Government commissioned a review into the need for a replacement research reactor. That review concluded that in about years, if certain conditions were met, the Government could make a decision in favour of a replacement reactor. A major milestone was achieved when, on 3 September 1997, the Australian Government announced the construction of a replacement research reactor at the site of Australia's existing research reactor HIFAR, subject to the satisfactory outcome of an environmental assessment process. The reactor will be have the dual purpose of providing a first class facility for neutron beam research as well as providing irradiation facilities for both medical isotope production and commercial irradiations. The project is scheduled for completion before the end of 2005. (author)

  19. Experimental researches of nuclear reactor neutron and gamma radiation scattering into the atmosphere

    International Nuclear Information System (INIS)

    Istomin, Yu.L.; Zelensky, D.I.; Cherepnin, Yu.S.; Orlov, Yu.V.; Netecha, M.E.; Avaev, V.N.; Vasel'ev, G.A.; Sakamoto, H.; Nomura, Y.; Naito, Y.

    1998-01-01

    In the report there are results of measuring radiation distribution on the caps of the RA and IWG.1M research reactors. Comparative analysis of the results is also in the report. There are neutron spectra in the interval of energies from 10 -9 to 13 MeV above RA and IWG.1M reactors. The spectra were measured with a set of activation detectors. Measurements were calculated to a nominal rate: for RA reactor - 300 kw, for IWG.1M - 7 MW. Thus, in the course of the experiment, vast experimental information relating to distribution of the RA and IWG.1M reactor gamma and neutron radiation scattered in the air for distances varying from 50 to 1000 m from the reactors has become available. The data obtained are to be used to verify the calculation codes and to validate the group nuclear constants

  20. Tasks related to increase of RA reactor exploitation and experimental potential, 01. Designing the protection chamber in the RA reactor hall for handling the radioactive experimental equipment (I-II) Part II, Vol. II

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1963-07-01

    This second volume of the project for construction of the protection chamber in the RA reactor hall for handling the radioactive devices includes the technical description of the chamber, calculation of the shielding wall thickness, bottom lead plate, horizontal stability of the chamber, cost estimation, and the engineering drawings

  1. Contamination, decontamination and radiochemical safety analyses of the RA reactor (Report 1966)

    International Nuclear Information System (INIS)

    Maksimovic, Z.

    1966-12-01

    This contract is concerned with development of methods for detection of fission products i the heavy water and quantitative radiochemical analysis for detecting one fission product which enables reliable verification of heavy water contamination by fission products and estimation of contamination level. Qualitative and quantitative radiometry measurements of fission products in water are shown on page 4. Page 6 shows study of contamination and decontamination of water on the laboratory level. Experiments have shown that the majority of fission products was adsorbed on the uranium oxide and that the iodine isotopes are partly in water (non-adsorbed). Gamma spectrometry analyses showed 131 I moves to distillate with the initial quantities of distilled water. decontamination factors compared to the total activity of fission products in distillator and distillate are not higher than ∼10 3 . Decontamination of water contaminated by uranium oxide and fission products in the distillation device of the RA reactor is shown on page 8. Experiments demanded special preparation due to high activity of uranium (1.7 g of uranium irradiated in the reactor for 10 days at neutron flux 1.10 13 n.cm 2 /s. Prior preparations for transport and dissolution of irradiated metal uranium as well as sampling were needed. Distillation was done under lower pressure and temperature to avoid possible contamination of the environment bu fission products and iodine. Decontamination factors are shown in Table. Contamination and decontamination of stainless steel on the laboratory level are described on page 5. It was found that the deposition of activity on the stainless steel plates is inhomogeneous showing that the uranium oxide and fission products are deposited on the rough metal surfaces. According to literature data and our laboratory studies decontamination was done by nitric acid solution (2MHNO 3 ). Since the heavy water system of the RA reactor was made of stainless teel (except the

  2. Research Reactors Coalitions

    International Nuclear Information System (INIS)

    Borio, Andrea; Bradley, E.; Vyshniauskas, Judy; Ridikas, Danas

    2013-01-01

    When considering the potential role of an existing RR or possibly the construction of a new RR, it is clear that a nuclear science and technology programme (including nuclear power) could benefit provided the RR is safely and competently managed, well utilised and adequately funded. Based on MSs experience, a domestic RR may not be required to develop a nuclear power programme, provided the decision takes advantage of foreign expertise, including access to foreign RRs facilities and RRs regional/international networks. If a country decides to gain access to a foreign research reactor, it may need considering the potential risk of change in the political relationship with the host country that could compromise the achievement of its national relevant objectives. This risk may be offset by availability of many options within one or more regional/international RRs networks and coalitions. Examples include the use of existing RRs in vendor, non-vendor countries and, in some cases non-nuclear power countries, to develop human resources in support of the introduction of nuclear power elsewhere. International RR networking trends are most evident with high flux, higher capability, and more complex fuel and material testing RRs being shared through international partnerships. However, networks involving low-medium power RRs for education and training purposes are also gaining a more prominent role to support nuclear capacity building in newcomer MSs. Networking through the internet seems also to be a promising way to support, as complementary offer to direct access to RRs facilities, MSs nuclear capacity building objectives (e.g. the IRL project)

  3. Investigation of the heavy water distillation system at the RA reactor; Ispitivanje sistema za destilaciju teske vode reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V; Badrljica, R [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    The heavy water distillation system was tested because this was not done before the reactor start-up. Detailed inspection of the system components showed satisfactory results. Leak testing was done as well as the testing of the instrumentation which enables reliable performance of the system. Performance testing was done with ordinary water and later 2700 l of heavy water from the reactor was purified, decreasing the activity by 45%.

  4. Research on reactor physics data

    International Nuclear Information System (INIS)

    1961-01-01

    In the early years of nuclear reactor research, each national program tended to develop its own reactor physics information. The Government of Norway proposed to the Agency the undertaking of a joint program in reactor physics utilizing the facilities and staff of its zero power reactor NORA then under construction. Following the approval by the Board of Governors in February, the Agency invited Member States to submit the names and qualifications of scientists they wished to suggest for the project. All the results and information gained through the program, which is expected to last about three years, will be placed at the disposal of the Agency's Member States

  5. Activity of the Service for maintenance of the electronic equipment of the RA reactor in 1976, report - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1976-01-01

    Within the organizational structure of the RA reactor staff, the Service for instrumentation maintenance has the following tasks: maintenance of the existing electronic equipment; participating in experiments planning and preparation of electronic equipment; purchasing new equipment, spare parts and components; construction of new equipment for internal needs; implementation of new equipment. Basic instrumentation of the reactor facility includes: control and protection system, and dosimetry system [sr

  6. Meeting on reactor safety research

    International Nuclear Information System (INIS)

    1982-09-01

    The meeting 'Reactor Safety Research' organized for the second time by the GRS by order of the BMFT gave a review of research activities on the safety of light water reactors in the Federal Repulbic of Germany, international co-operation in this field and latest results of this research institution. The central fields of interest were subjects of man/machine-interaction, operational reliability accident sequences, and risk. (orig.) [de

  7. The research reactors their contribution to the reactors physics

    International Nuclear Information System (INIS)

    Barral, J.C.; Zaetta, A.; Johner, J.; Mathoniere, G.

    2000-01-01

    The 19 october 2000, the french society of nuclear energy organized a day on the research reactors. This associated report of the technical session, reactors physics, is presented in two parts. The first part deals with the annual meeting and groups general papers on the pressurized water reactors, the fast neutrons reactors and the fusion reactors industry. The second part presents more technical papers about the research programs, critical models, irradiation reactors (OSIRIS and Jules Horowitz) and computing tools. (A.L.B.)

  8. Preparation of a criticality benchmark based on experiments performed at the RA-6 reactor

    International Nuclear Information System (INIS)

    Bazzana, S.; Blaumann, H; Marquez Damian, J.I

    2009-01-01

    The operation and fuel management of a reactor uses neutronic modeling to predict its behavior in operational and accidental conditions. This modeling uses computational tools and nuclear data that must be contrasted against benchmark experiments to ensure its accuracy. These benchmarks have to be simple enough to be possible to model with the desired computer code and have quantified and bound uncertainties. The start-up of the RA-6 reactor, final stage of the conversion and renewal project, allowed us to obtain experimental results with fresh fuel. In this condition the material composition of the fuel elements is precisely known, which contributes to a more precise modeling of the critical condition. These experimental results are useful to evaluate the precision of the models used to design the core, based on U 3 Si 2 and cadmium wires as burnable poisons, for which no data was previously available. The analysis of this information can be used to validate models for the analysis of similar configurations, which is necessary to follow the operational history of the reactor and perform fuel management. The analysis of the results and the generation of the model were done following the methodology established by International Criticality Safety Benchmark Evaluation Project, which gathers and analyzes experimental data for critical systems. The results were very satisfactory resulting on a value for the multiplication factor of the model of 1.0000 ± 0.0044, and a calculated value of 0.9980 ± 0.0001 using MCNP 5 and ENDF/B-VI. The utilization of as-built dimensions and compositions, and the sensitivity analysis allowed us to review the design calculations and analyze their precision, accuracy and error compensation. [es

  9. Safety analysis for research reactors

    International Nuclear Information System (INIS)

    2008-01-01

    The aim of safety analysis for research reactors is to establish and confirm the design basis for items important to safety using appropriate analytical tools. The design, manufacture, construction and commissioning should be integrated with the safety analysis to ensure that the design intent has been incorporated into the as-built reactor. Safety analysis assesses the performance of the reactor against a broad range of operating conditions, postulated initiating events and other circumstances, in order to obtain a complete understanding of how the reactor is expected to perform in these situations. Safety analysis demonstrates that the reactor can be kept within the safety operating regimes established by the designer and approved by the regulatory body. This analysis can also be used as appropriate in the development of operating procedures, periodic testing and inspection programmes, proposals for modifications and experiments and emergency planning. The IAEA Safety Requirements publication on the Safety of Research Reactors states that the scope of safety analysis is required to include analysis of event sequences and evaluation of the consequences of the postulated initiating events and comparison of the results of the analysis with radiological acceptance criteria and design limits. This Safety Report elaborates on the requirements established in IAEA Safety Standards Series No. NS-R-4 on the Safety of Research Reactors, and the guidance given in IAEA Safety Series No. 35-G1, Safety Assessment of Research Reactors and Preparation of the Safety Analysis Report, providing detailed discussion and examples of related topics. Guidance is given in this report for carrying out safety analyses of research reactors, based on current international good practices. The report covers all the various steps required for a safety analysis; that is, selection of initiating events and acceptance criteria, rules and conventions, types of safety analysis, selection of

  10. Research reactor 'A' 6.5/10 MW; Istrazivacki reaktor 'A' 6,5/10 MW

    Energy Technology Data Exchange (ETDEWEB)

    Petrovic, M [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1961-07-01

    This booklet includes a short description of the RA research reactor with basic properties of its components: control and safety system, heavy water system, technical water cooling system, heavy water distillation system, cover gas system, dosimetry control system, power supply system. It is used for fundamental research in reactor and nuclear physics, isotope production, materials testing.

  11. Data concerning operation and application of RA reactor in 1975, Annex 1; Prilog 1 - Podaci o radu i iskoriscenosti reaktora RA u 1975. godini

    Energy Technology Data Exchange (ETDEWEB)

    Stanic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    RA reactor was operating according to the plan for 1975 adopted in December of the previous year. It was planned for reactor to be operated at nominal power first 10-20 days each month, three following days were reserved for different power levels according to the users' demand. Four fuel exchanges were planned and fulfilled with minor delay. Data concerning planned and real operation, as well as delays from the plan and shorter interruptions are presented in tables of this Annex. It is shown that all the delays and interruptions which amounted to 104 hours were compensated. [Serbo-Croat] Reaktor RA je radio prema planu rada za 1975. godinu, nacinjenom u decembru prethodne godine. Planirano je da reaktor radi neprekidno prvih 10-20 dana u mesecu na nominalnoj snazi, tri sledeca dana je rezervisano za rad na drugim snagama zavisno od potreba korisnuka. Planirane su i 4 izmene goriva. Podaci o planiranom i ostvarenom radu kao i odstupanjima od plana i kracim prekidima u radu reaktora dati su u tabelama ovog priloga. Vidi se da su sva odstupanja i prekidi u ukupnom trajanju od 104 sata u celini nadoknadjeni.

  12. Radioactivity in the environment of the RA nuclear reactor in Vinca for the period 1977-1980. Material prepared for the RA reactor safety report; Radioaktivnost okoline nuklearnog reaktora RA u Vinci u periodu 1977-1980, Materijal pripremljen za izradu Sigurnosnog izvestaja za reaktor RA

    Energy Technology Data Exchange (ETDEWEB)

    Ajdacic, N; Martinc, R [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1980-12-15

    Review of the environmental monitoring data presented in this report is prepared for the RA reactor safety report. These data resulted from four-year monitoring of precipitations and deposited dust. Measurements were done daily. In addition to these data, tables contain mean daily values, total monthly values of beta activities of precipitation from 1977 - 1980. Radioactivity control of the RA reactor environment showed that there was no significant discrepancy compared to the mean values for several years, apart from seasonal variations and meteorological influences. In the period from October 1976 to mid 1978 a number of higher values were recorded probably due to nuclear explosions. During 1979 the general activity level was relatively low, showing increase tendency during 1980.

  13. Safety analysis of RA reactor operation, I-III, Part III - Environmental effect of the maximum credible accident

    International Nuclear Information System (INIS)

    Raisic, N.

    1963-02-01

    Maximum credible accident at the RA reactor would consider release of fission products into the environment. This would result from fuel elements failure or meltdown due to loss of coolant. The analysis presented in this report assumes that the reactor was operating at nominal power at the moment of maximum possible accident. The report includes calculations of fission products activity at the moment of accident, total activity release during the accident, concentration of radioactive material in the air in the reactor neighbourhood, and the analysis of accident environmental effects

  14. Training of research reactor personnel

    International Nuclear Information System (INIS)

    Cherruau, F.

    1980-01-01

    Research reactor personnel operate the reactor and carry out the experiments. These two types of work entail different activities, and therefore different skills and competence, the number of relevant staff being basically a function of the size, complexity and versatility of the reactor. Training problems are often reactor-specific, but the present paper considers them from three different viewpoints: the training or retraining of new staff or of personnel already employed at an existing facility, and training of personnel responsible for the start-up and operation of a new reactor, according to whether local infrastructure and experience already exist or whether they have to be built up from scratch. On-the-spot experience seems to be an essential basis for sound training, but requires teaching abilities and aids often difficult to bring together, and the availability of instructors that does not always fit in smoothly with current operational and experimental tasks. (author)

  15. Neutron spectrometry in mixed fields: characterisation of the Ra-1- reactor workplace

    International Nuclear Information System (INIS)

    Gregori, B.; Carelli, J.; Cruzate, J.; Papadopulos, S.

    2006-01-01

    The characterisation of the neutron spectrum of a workplace is an essential dosimetric tool for improving the assessment of the personal equivalent dose of the workers. In addition, if the operational conditions of the facility are well defined, the set of field spectra obtained may be used as a reference for comparing the performance of different type of neutron detectors. Recently, using a neutron spectrometric system based on a set of moderated spheres with 3 He detector, the characterisation of the neutron spectra in workplaces of the Argentine Reactor No. 1 (R.A. -1) has been carried out. The spectrometric system consists of 12 spheres made of the high density polyethylene d mean δ =0.95 g cm 3 , with diameters between 3'' and 12'' and a proportional counter of 3 He, 4 atm of nominal pressure, Centronic trade mark, located in the centre of the spheres. The neutron response matrix was calculated using the M.C.N.P. -I.V.B. code and E.N.D.F./B-VI library in the energy range between thermal neutron and 100 MeV. The neutron spectrum was unfolded using the M.A.X.E.D. unfolding code. The validation of the spectrometric system was performed at Cea-Cadarache (France) with of 252 Cf, Am Be, and 252 Cf + D 2 O sources. Therefore, in this work, the spectral fluence of the field in the selected points of the facility (R.A.-1) has been presented and the ambient dose equivalent, H *(10), and the personal dose equivalent, Hp(10), have been derived from the neutron fluence, applying ICRP-74 recommended fluence to dose conversion factors. The quantities evaluated have uncertainties less than 15%, which is considered good enough for radiation protection requirements. (authors)

  16. Operation and maintenance of the RA nuclear reactor for 1977, Report Annex I; Rad i iskoriscenost reaktora RA u 1977. godini, izvestaj Prilog I

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Stanic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1977-12-15

    RA reactor operation plan was fulfilled, meaning 28583 MWh. In addition to 183 days of operation at full power, during 1977 the reactor was operated for 14 days at lower power level according to the demand of users. The utilization level of rector irradiation capability (neutron flux and time of operation) was 14%. This annex includes detailed statistical data about reactor operation, utilization, power level, savings concerned with new 80% enriched fuel. All the 9 vertical experimental channels were used for irradiation in the reactor core. Digression from the action plan were caused by refueling and demand od the users. There have been 11 safety shutdowns, of which 6 caused by power cuts, 4 due to failure of the instruments, and 1 due to earthquake in March 1977. [Serbo-Croat] Planirani rad reaktora na nominalnoj snazi ostvaren je u iznosu od 28583 MWh. U toku 1977. godine reaktor je radio 14 dana na manjim snagama i u posebnom eksperimentalnom rezimu na zahtev korisnika. Iskoriscenost kapaciteta reaktora za ozracivanje uzoraka (na bazi neutronskog fluksa i vremena rada reaktora) bila je 41%. Ovaj izvestaj sadrzi detaljne statisticke podatke o radu i iskoriscenosti reaktora, podatke o ustedi goriva prelaskom na 80% obogaceno gorivo. Korisceno je svih 9 vertikalnih eksperimentalnih kanala u aktivnoj zoni. Uzroci odstupanja od plana rada osim zamene goriva bili su zahtevi korisnika. Bilo je 11 sigurnosnih zaustavljanja, 6 usled nestanka napona, 4 usled kvarova opreme i instrumentacije, i 1 put usled zemljotresa u martu.

  17. Tasks related to increase of RA reactor exploitation and experimental potential, 02. Verification of the system for detecting failures of the RA reactor fuel element cladding; Radovi na povecanju eksploatacionih i eksperimentalnih mogucnosti reaktora RA, 02. Provera sistema za detekciju pucanja kosuljice gorivnog elementa reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-07-15

    For the purpose of this task it was necessary to analyze the time dependent distribution of fission products in the fuel element and leaks through the cracks in the cladding; to calculate the quantity of solid fission products, volatile fission products and fission gases for the RA reactor; to collect the data for estimating the activity of the short-living isotopes created by neutron irradiation of D{sub 2}O; analyze the number of delayed neutrons in D{sub 2}O. Experiment were needed to estimate the distribution of Xe and Kr in the heavy water in the reactor channel and analyze the activity of D{sub 2}O and helium based on reactor operation data. For the purpose of verifying the efficiency and safety of the existing system for detecting the cracks of the fuel element cladding is presented in this report together with the review of similar systems at a number of reactors in the world.

  18. Program of critical experiment and measurements at the RA reactor; Program kriticnih eksperimenata i merenja na reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-04-14

    Program described in this document describes in detail the following experiments: critical experiments with two reactor core lattices with 38 and 44 fuel channels, initial heavy water level being 1300 mm, criticality is achieved by adding heavy water; preliminary analysis of heavy water quality and verification of the fuel isotopic contents; experiment with the initial core which contains 56 fuel channels with maximum heavy water level according to the Russian proposal; measurement of neutron flux by Dy and In foils; measurement of reactivity excess dependent on the heavy water level and number of fuel rods; measurement of reactor period for determined reactivity change; measurement of moderator temperature coefficient; measurement of absolute flux. [Serbo-Croat] Program sadrzan u ovom dokumentu opisuje detaljno sledece eksperimente: kriticni eksperiment sa dve konfiguracije jezgra reaktora, sa 38 i 44 gorivna kanala, pocetni nivo teske vode je 1300 mm, kriticnost se dostize dodavanjem teske vode; prethodno izvrsenom analizom teske vode i proverom izotopskog sastava goriva; eksperiment sa pocetnom resetkom koja prema ruskom predlogu sadrzi 56 gorivnih kanala i maksimalnom visinom teske vode; merenje raspodele neutronskog fluksa folijama Dy i In; kalibracija regulacionih sipki; merenje viska reaktivnosti sa promenom visine nivoa teske vode i promenom broja sipki; merenje periode reaktora za odredjenu promenu reaktivnosti; merenje temperaturnog koeficijenta za vodu; merenje apsolutnog fluksa.

  19. Independent CO{sub 2} loop for cooling the samples irradiated in vertical experimental channels of the RA reactor, Vol. I; Nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u vertikalnim eksperimentalnim kanalima reaktora RA, Album I

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M; Pavlovic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-06-15

    Project 'independent CO{sub 2} loop for cooling the samples irradiated in the vertical experimental channels of the RA reactor' is presented in two volumes: volume I - head of the low temperature coolant loop for reactor RA, and volume II - Outer low-temperature reactor coolant loop. Volume I includes: the design specifications for the head of the low-temperature coolant loop, technical description, thermal calculation, calculations of mechanical loads, antireactivity and activation of the components of the coolant loop head, engineering schemes and drawings, cost estimation data. [Serbo-Croat] Projekat 'Nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u vertikalnim eksperimentalnim kanalima reaktora RA', sastoji se od dva albuma: album I - Glava niskotemperaturno rashladne petlje za reaktor RA, album II - Spoljno kolo niskotemperaturne rashladne petlje za reaktora. Album I sadrzi projektni zadatak glave niskotemperaturne petlje, tehnicki opis, termicki proracun, proracun mehanickih naprezanja, antireaktivnosti i aktivacije kontrukcionih elemenata glave petlje, konstrukcione seme i crteze glave petlje, predracun.

  20. Results of environmental radiation monitoring and meteorology measurements (material prepared for obtaining the licence for RA reactor experimental operation); Rezultati merenja zracenja u okolini i rezultati meteoroloskih merenja (materijal pripremljen radi dobijanja dozvole za pustanje Reaktora RA u probni rad)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-10-15

    According to the demands for obtaining the licence for restarting the Ra reactor and the experimental operation this document includes the radiation monitoring measured data in the working space and environment of the RA reactor, i.e. Boris Kidric Institute. The meteorology measured data are included as well. All the measurements are performed according to the radiation protection program applied actually from the first reactor start-up at the end of 1959. [Serbo-Croat] Saglasno zahtevu za dobijanje dozvole za ponovno pustanje u probni rad reaktora RA, ovaj dokument sadrzi rezultate merenja zracenja u okolini (radnoj i zivotnoj) reaktora RA odnosno instituta 'Boris Kidric' kao i podatke o meteoroloskim merenjima. Sve merenja rade se prema programu mera zastite od zracenja koje se sprovode prakticno od prvog pustanja reaktora u rad krajem 1959. godine.

  1. Calculation-measurement comparison for control rods reactivity in RA-3 nuclear reactor

    International Nuclear Information System (INIS)

    Estryk, Guillermo; Gomez, Angel

    2002-01-01

    The RA-3 Nuclear Reactor of the Atomic Energy National Commission from Argentina, begun working with high enrichment fuel elements in 1967, and turned to low enrichment by 1990. During 1999 it was found out that several fuel elements had problems, so more than 50 % of them had to be removed from the core. Because of this, it was planned to go from core 93 to core 94 with special care from nuclear safety point of view. Core 94 was preceded by other five, T-1 to T-5, only as transitory ones. The care implied several nuclear parameters measurements: core reactivity excess, calibration of control rods, etc. Calculations were performed afterwards to simulate those measurements using the neutron diffusion code PUMA. The comparison shows a good agreement for more than 80% of the cases with differences lower than 10% in reactivity. The greatest differences were found in the last part of the control rods calibration and a better calculation of cell constants is planned to be done in order to improve the adjustment. (author)

  2. Measurement of gamma radiation doses at the RA reactor by thermoluminescent dosemeters

    International Nuclear Information System (INIS)

    Prokic, M.

    1974-01-01

    This paper presents the procedures and gamma radiation doses measured at the exit from the horizontal experimental channel HK-5, vertical experimental channel VK-5 and in the thermal column of the RA reactor in Vinca. Measurement of gamma radiation dose in the mixed intense gamma and neutron radiation field was done by two types of thermoluminescent dosemeters, LiF (TLD-700) and CaF 2 (TLD-08). Gamma dose in the VK-5 was measured in the air and on the bottle filled with tissue-equivalent solution. Increase of the dose on the surface of the bottle was 2.3 compared to the gamma dose value in the air. Correction for the influence of neutrons having different energies was done by using the known sensitivity values of both TL dosemeter types for thermal, intermediate and fast neutrons. Results showed that the TLD-700 dosemeter contains 5 time more Li-6 isotopes (0.035%) than the declared value causing increased neutron sensitivity of this dosemeter. This paper includes numerical sensitivity data for neutrons of different energies for both types of TL dosemeters. Neutron sensitivity values for TLD-700 are related to LiF with 0.035% of Li-6 isotope. Result of measurement have also shown that the CaF 2 :Mn (TLD-08) thermoluminescent dosemeter is more suitable for gamma radiation dose measurements in mixed n-gamma fields with intensive neutron fluxes due to lower neutron sensitivity compared to TLD-700 [sr

  3. Operation, maintenance and utilization of the RA reactor - Report on operation in 1979; Pogon, odrzavanje i eksploatacija reaktora RA, Izvestaj o radu u 1979. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M

    1979-12-15

    During 1979 the RA reactor was in operation only three months, i.e. only 24% of the planned activity was achieved. The reactor operation was interrupted in March due to problems that could not be solved by the existing equipment. Alkalinity of the heavy water resulting from the existing ammonia ions could not be removed by the existing distillation system. In addition deposition of aluminium oxyhydrate on the fuel elements was increased. This was noticed during routine control when the reactor was shutdown for refueling. The decision of the Director general of the Institute and sanitary Inspector followed, prohibiting further reactor operation. A separate chapter of this report is devoted to the analysis of the difficulties and possible solution of the problem in cooperation with the experts from different laboratories of the Institute. Aged and damaged instruments at the reactor were not exchange due to lack of budget. During the operation there were no accidents. [Serbo-Croat] U toku 1979. godine plan rada ostvaren je sa 24%, odnosno reaktor je radio samo prva tri meseca. U martu je doslo do prekida rada reaktora zbog pojave koja se nije mogla otkloniti postojecom opremom. Alkalnost teske vode, posledica prisustva amonijum jona, ne moze se odstraniti sistemom destilacije. Pored toga usled dotrajalosti opreme povecano je talozenje aluminijum oksihidroksida na gorivnim elementima. Ova pojava uocena je tokom rutinske kontrole prilikom izmene goriva a usledila je obustava rada resenjem Direktora i sanitarnog inspektora. Posebno poglavlje ovog izvestaja posveceno je analizi teskoca u radu i reaktora i resavanju nastalih problema sa gorivom u saradnji sa saradnicima drugih laboratorija Instituta. Dotrajali uredjaji i oprema nisu zamenjeni usled nedostatka sredstava. U toku rada nije bilo akcidenata.

  4. Utilization of nuclear research reactors

    International Nuclear Information System (INIS)

    1980-01-01

    Full text: Report on an IAEA interregional training course, Budapest, Hungary, 5-30 November 1979. The course was attended by 19 participants from 16 Member States. Among the 28 training courses which the International Atomic Energy Agency organized within its 1979 programme of technical assistance was the Interregional Training Course on the Utilization of Nuclear Research Reactors. This course was held at the Nuclear Training Reactor (a low-power pool-type reactor) of the Technical University, Budapest, Hungary, from 5 to 30 November 1979 and it was complemented by a one-week Study Tour to the Nuclear Research Centre in Rossendorf near Dresden, German Democratic Republic. The training course was very successful, with 19 participants attending from 16 Member States - Bangladesh, Bolivia, Czechoslovakia, Ecuador, Egypt, India, Iraq, Korean Democratic People's Republic, Morocco, Peru, Philippines, Spain, Thailand, Turkey, Vietnam and Yugoslavia. Selected invited lecturers were recruited from the USA and Finland, as well as local scientists from Hungarian institutions. During the past two decades or so, many research reactors have been put into operation around the world, and the demand for well qualified personnel to run and fully utilize these facilities has increased accordingly. Several developing countries have already acquired small- and medium-size research reactors mainly for isotope production, research in various fields, and training, while others are presently at different stages of planning and installation. Through different sources of information, such as requests to the IAEA for fellowship awards and experts, it became apparent that many research reactors and their associated facilities are not being utilized to their full potential in many of the developing countries. One reason for this is the lack of a sufficient number of trained professionals who are well acquainted with all the capabilities that a research reactor can offer, both in research and

  5. Power measurement of the RA-3 reactor using the neutron noise technique and {sup 16}N; Medicion de la potencia del reactor RA-3, mediante la tecnica de ruido neutronico y nitrogeno 16

    Energy Technology Data Exchange (ETDEWEB)

    Gomez, Angel [Comision Nacional de Energia Atomica, General San Martin (Argentina). Dept. Reactores y Centrales Nucleares

    2003-07-01

    This work describes a measurement method based on the neutron noise technique which is used for determining the relation between the power and the currents of two ionization chambers. These chambers are sensitive to the gamma radiation from the {sup 16}N decay produced in the RA-3 reactor core. The power during operation is obtained from the calibration factors by measuring those currents. As this calibration factors depend on the cooler flow that circulates in the reactor core and in the {sup 16}N measuring system, an estimator, that is a function of the ratio of this currents, is proposed in order to detect flow changes. (author)

  6. Computerized reactor monitor and control for research reactors

    International Nuclear Information System (INIS)

    Buerger, L.; Vegh, E.

    1981-09-01

    The computerized process control system developed in the Central Research Institute for Physics, Budapest, Hungary, is described together with its special applications at research reactors. The nuclear power of the Hungarian research reactor is controlled by this computerized system, too, while in Lybia many interesting reactor-hpysical calculations are built into the computerized monitor system. (author)

  7. Irradiation of an uranium silicide prototype in RA-3 reactor; Irradiacion de un elemento combustible prototipo de siliciuro de uranio en el RA-3

    Energy Technology Data Exchange (ETDEWEB)

    Calabrese, R; Estrik, G; Notari, C [Comision Nacional de Energia Atomica, San Martin (Argentina). Unidad de Actividad Reactores y Centrales Nucleares

    1997-12-31

    The factibility of irradiation of an uranium silicide (U{sub 3} Si{sub 2}) prototype in the RA-3 reactor was studied. The standard RA-3 fuel element uses U{sub 3} O{sub 8} as fissible material. The enrichment of both standard and prototype is the same: 20% U{sub 235} and also the frame geometry and number of plates is identical. The differences are in the plate dimensions and the fissile content which is higher in the prototype. The cooling conditions of the core allow the insertion of the prototype in any core position, even near the water trap, if the overall power is kept below 5Mw. Nevertheless, the recommendation was to begin irradiation near the periphery and later on move the prototype towards more central positions in order to increase the burnup rate. The prototype was effectively introduced in a peripheral position and the thermal fluxes were measured between plates with the foil activation technique. These were also evaluated with the fuel management codes and a reasonable agreement was found. (author). 5 refs., 3 figs., 3 tabs.

  8. Research reactor modernization and refurbishment

    International Nuclear Information System (INIS)

    2009-08-01

    Many recent, high profile research reactor unplanned shutdowns can be directly linked to different challenges which have evolved over time. The concept of ageing management is certainly nothing new to nuclear facilities, however, these events are highlighting the direct impact unplanned shutdowns at research reactors have on various stakeholders who depend on research reactor goods and services. Provided the demand for these goods and services remains strong, large capital projects are anticipated to continue in order to sustain future operation of many research reactors. It is within this context that the IAEA organized a Technical Workshop to launch a broader Agency activity on research reactor modernization and refurbishment (M and R). The workshop was hosted by the operating organization of the HOR Research Reactor in Delft, the Netherlands, in October 2006. Forty participants from twenty-three countries participated in the meeting: with representation from Africa, Asia Pacific, Eastern Europe, North America, South America and Western Europe. The specific objectives of this workshop were to present facility reports on completed, existing and planned M and R projects, including the project objectives, scope and main characteristics; and to specifically report on: - the project impact (planned or actual) on the primary and key supporting motivation for the M and R project; - the project impact (planned or actual) on the design basis, safety, and/or regulatory-related reports; - the project impact (planned or actual) on facility utilization; - significant lessons learned during or following the completion of M and R work. Contributions from this workshop were reviewed by experts during a consultancy meeting held in Vienna in December 2007. The experts selected final contributions for inclusion in this report. Requests were also distributed to some authors for additional detail as well as new authors for known projects not submitted during the initial 2006 workshop

  9. Experimental verification of methods for gamma dose rate calculations in the vicinity of containers with the RA reactor spent fuel elements

    International Nuclear Information System (INIS)

    Milosevic, M.; Cupac, S.; Pesic, M.

    2005-01-01

    The methodology for equivalent gamma dose rate determination on the outer surface of existing containers with the spent fuel elements of the RA reactor is briefly summarised, and experimental verification of this methodology in the field of gamma rays near the aluminium channel with spent fuel elements lifted from the stainless steel containers no. 275 in the RA reactor hall is presented. The proposed methodology is founded on: the existing fuel burnup data base; methods and models for the photon source determination in the RA reactor spent fuel elements developed in the Vinca Institute, and validated Monte Carlo codes for the equivalent gamma dose rate calculations. (author) [sr

  10. Research reactor fuel - an update

    International Nuclear Information System (INIS)

    Finlay, M.R.; Ripley, M.I.

    2003-01-01

    In the two years since the last ANA conference there have been marked changes in the research reactor fuel scene. A new low-enriched uranium (LEU) fuel, 'monolithic' uranium molybdenum, has shown such promise in initial trials that it may be suitable to meet the objectives of the Joint Declaration signed by Presidents Bush and Putin to commit to converting all US and Russian research reactors to LEU by 2012. Development of more conventional aluminium dispersion UMo LEU fuel has continued in the meantime and is entering the final qualification stage of multiple full sized element irradiations. Despite this progress, the original 2005 timetable for UMo fuel qualification has slipped and research reactors, including the RRR, may not convert from silicide to UMo fuel before 2007. The operators of the Swedish R2 reactor have been forced to pursue the direct route of qualifying a UMo lead test assembly (LTA) in order to meet spent fuel disposal requirements of the Swedish law. The LTA has recently been fabricated and is expected to be loaded shortly into the R2 reactor. We present an update of our previous ANA paper and details of the qualification process for UMo fuel

  11. Utilization of research reactors - A global perspective

    International Nuclear Information System (INIS)

    Muranaka, R.G.

    1988-01-01

    This paper presents 1) a worldwide picture of research reactors, operable, shutdown, under construction and planned, 2) statistics on utilization of research reactors including TRIGA reactors, and 3) some results of a survey conducted during 1988 on the utilization of research reactors in developing Member States in the Asia-Pacific Region

  12. Radiation protection at the RA Reactor in 1988, Part -2, Annex 2c, Environmental radioactivity control, meteorology measurements

    International Nuclear Information System (INIS)

    Grsic, Z.; Zaric, M.; Adamovic, M.; Stevanovic, M.

    1988-01-01

    During 1988, meteorology measurements were continued as a part of the environmental control of the Vinca Institute. This report covers the period from November 1984 - November 1985. Part of the meteorology measurements and data analysis is adapted to the needs of the Institute, i.e. RA reactor and some Laboratories. The objective of these activities is forming the data base for solving everyday and special problems related to control, protection and safety of Institute environment [sr

  13. New experimental space for irradiating samples by RA reactor fast neutron flux at temperatures up to 100 deg C

    International Nuclear Information System (INIS)

    Pavicevic, M.; Novakovic, M.; Zecevic, V.

    1961-01-01

    The objective of this paper is to present adaptation of the RA reactor which would enable samples irradiation by fast neutrons and describe new experimental possibilities. New experimental space was achieved using hollow fuel elements which have been reconstructed to enable placement of irradiation capsules inside the tube. This paper includes thermal analysis and describes problems related to operation, safety and radiation protection issues which arise from using reconstructed fuel elements

  14. Strategic Planning for Research Reactors

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA-TECDOC-1212 which primarily focused on enhancing the utilization of existing research reactors. This updated version also provides guidance on how to develop and implement a strategic plan for a new research reactor project and will be of particular interest for organizations which are preparing a feasibility study to establish such a new facility. This publication will enable managers to determine more accurately the actual and potential capabilities of an existing reactor, or the intended purpose and type of a new facility. At the same time, management will be able to match these capabilities to stakeholders/users’ needs and establish the strategy of meeting such needs. In addition, several annexes are presented, including some examples as clarification to the main text and ready-to-use templates as assistance to the team drafting a strategic plan.

  15. Conclusions of the experts group of the RA reactor at the meeting held on November 2 and 3 1964 - Annex 12a

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1964-01-01

    Conclusions of the experts group of the RA reactor are related to: analyses of reactor operation at 6.5 MW power with heavy water coolant flow of 250 m 3 /h (2 pumps rotation speed 1500 rotations/min); decisions of future operation; further preparation activities related to reactor operation in forced regime and reduced cooling conditions

  16. Research reactors: design, safety requirements and applications

    International Nuclear Information System (INIS)

    Hassan, Abobaker Mohammed Rahmtalla

    2014-09-01

    There are two types of reactors: research reactors or power reactors. The difference between the research reactor and energy reactor is that the research reactor has working temperature and fuel less than the power reactor. The research reactors cooling uses light or heavy water and also research reactors need reflector of graphite or beryllium to reduce the loss of neutrons from the reactor core. Research reactors are used for research training as well as testing of materials and the production of radioisotopes for medical uses and for industrial application. The difference is also that the research reactor smaller in terms of capacity than that of power plant. Research reactors produce radioactive isotopes are not used for energy production, the power plant generates electrical energy. In the world there are more than 284 reactor research in 56 countries, operates as source of neutron for scientific research. Among the incidents related to nuclear reactors leak radiation partial reactor which took place in three mile island nuclear near pennsylvania in 1979, due to result of the loss of control of the fission reaction, which led to the explosion emitting hug amounts of radiation. However, there was control of radiation inside the building, and so no occurred then, another accident that lead to radiation leakage similar in nuclear power plant Chernobyl in Russia in 1986, has led to deaths of 4000 people and exposing hundreds of thousands to radiation, and can continue to be effect of harmful radiation to affect future generations. (author)

  17. Advanced Research Reactor Fuel Development

    Energy Technology Data Exchange (ETDEWEB)

    Kim, C. K.; Park, H. D.; Kim, K. H. (and others)

    2006-04-15

    RERTR program for non-proliferation has propelled to develop high-density U-Mo dispersion fuels, reprocessable and available as nuclear fuel for high performance research reactors in the world. As the centrifugal atomization technology, invented in KAERI, is optimum to fabricate high-density U-Mo fuel powders, it has a great possibility to be applied in commercialization if the atomized fuel shows an acceptable in-reactor performance in irradiation test for qualification. In addition, if rod-type U-Mo dispersion fuel is developed for qualification, it is a great possibility to export the HANARO technology and the U-Mo dispersion fuel to the research reactors supplied in foreign countries in future. In this project, reprocessable rod-type U-Mo test fuel was fabricated, and irradiated in HANARO. New U-Mo fuel to suppress the interaction between U-Mo and Al matrix was designed and evaluated for in-reactor irradiation test. The fabrication process of new U-Mo fuel developed, and the irradiation test fuel was fabricated. In-reactor irradiation data for practical use of U-Mo fuel was collected and evaluated. Application plan of atomized U-Mo powder to the commercialization of U-Mo fuel was investigated.

  18. Diagnostic measurement on research reactors

    International Nuclear Information System (INIS)

    Dach, K.; Zbytovsky, A.

    A comparison is made of noise experiments on zero power and power reactors. The general characteristics of noise experiments on power reactors is their ''passivity'', i.e., the experiment does not require any interruption of the normal operating regime of the reactor system. On zero power research reactors where the fission reaction constitutes the dominant noise source such conditions have to be created in the study of noise components as to make the investigated noise dominant and the noise of the fission reaction the background. The simultaneous use of both methods makes it possible to determine the spectral composition of reactivity fluctuations, which facilitates the identification of noise sources. The conditions are described of the recordability of noise components. The possibilities are listed provided for research work in Czechoslovakia and the possibility is studied of setting up an expert team to organize the respective experimental programme on an international scale. Power reactors manufactured in the GDR are considered as the suitable experimental base. (J.P.)

  19. Australia's replacement research reactor project

    International Nuclear Information System (INIS)

    Harris, K.J.

    1999-01-01

    HIFAR, a 10 MW tank type DIDO Class reactor has operated at the Lucas Heights Science and Technology Centre for 43 years. HIFAR and the 10 kW Argonaut reactor 'Moata' which is in the Care and Maintenance phase of decommissioning are Australia's only nuclear reactors. The initial purpose for HIFAR was for materials testing to support a nuclear power program. Changing community attitude through the 1970's and a Government decision not to proceed with a planned nuclear power reactor resulted in a reduction of materials testing activities and a greater emphasis being placed on neutron beam research and the production of radioisotopes, particularly for medical purposes. HIFAR is not fully capable of satisfying the expected increase in demand for medical radiopharmaceuticals beyond the next 5 years and the radial configuration of the beam tubes severely restricts the scope and efficiency of neutron beam research. In 1997 the Australian Government decided that a replacement research reactor should be built by the Australian Nuclear Science and Technology Organisation at Lucas Heights subject to favourable results of an Environmental Impact Study. The Ei identified no reasons on the grounds of safety, health, hazard or risk to prevent construction on the preferred site and it was decided in May 1999 that there were no environmental reasons why construction of the facility should not proceed. In recent years ANSTO has been reviewing the operation of HIFAR and observing international developments in reactor technology. Limitations in the flexibility and efficiency achievable in operation of a tank type reactor and the higher intrinsic safety sought in fundamental design resulted in an early decision that the replacement reactor must be a pool type having cleaner and higher intensity tangential neutron beams of wider energy range than those available from HIFAR. ANSTO has chosen to use it's own resources supported by specialised external knowledge and experience to identify

  20. 2012 review of French research reactors

    International Nuclear Information System (INIS)

    Estrade, Jerome

    2013-01-01

    Proposed by the French Reactor Operators' Club (CER), the meeting and discussion forum for operators of French research reactors, this report first gives a brief presentation of these reactors and of their scope of application, and a summary of highlights in 2012 for each of them. Then, it proposes more detailed presentations and reviews of characteristics, activities, highlights, objectives and results for the different types of reactors: neutron beam reactors (Orphee, High flux reactor-Laue-Langevin Institute or HFR-ILL), technological irradiation reactors (Osiris and Phenix), training reactors (Isis and Azur), reactors for safety research purposes (Cabri and Phebus), reactors for neutronic studies (Caliban, Prospero, Eole, Minerve and Masurca), and new research reactors (the RES facility and the Jules Horowitz reactor or JHR)

  1. Caramel fuel for research reactors

    International Nuclear Information System (INIS)

    Bussy, P.

    1979-11-01

    This fuel for research reactors is made of UO 2 pellets in a zircaloy cladding to replace 93% enriched uranium. It is a cold fuel, non contaminating and non proliferating, enrichment is only 7 to 8%. Irradiation tests were performed until burn-up of 50000 MWD/t [fr

  2. Fast reactor research in Switzerland

    International Nuclear Information System (INIS)

    Brogli, R.; Hudina, M.; Pelloni, S.; Sigg, B.; Stanculescu, A.

    1998-01-01

    The small Swiss research program on fast reactors serves to further understanding of the role of LMFR for energy production and to convert radioactive waste to more environmentally benign forms. These activities are on the one hand the contribution to the comparison of advanced nuclear systems and bring on the other to our physical and engineers understanding. (author)

  3. Spatial distribution of reactor radiation around the horizontal experimental hole of the RA Reactor at Vinca; Prostorna raspodela reaktorskog zracenja oko horizontalnog eksperimentalnog kanala reaktora RA u Vinci

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M; Paligoric, D; Vujisic, B [Institute of Nuclear Sciences Vinca, Beograd (Serbia and Montenegro)

    1964-10-15

    A survey is given of the measurement of the spatial distribution of thermal and fast neutrons and gamma radiations inside and around the reactor radiation beam which is carried through the experimental channel outside the reactor biological shield thus being a potential danger for the personnel in the reactor hall. The results obtained are used to determine the optimal distribution of the shielding elements around the free radiation beam. The activation method was used to determine the distribution of slow and fast neutrons. The detectors were Au{sup 197} and In {sup 115} for slow, and the S{sup 32} (n,p) P{sup 32} reaction for fast neutrons. The relative distribution of slow and fast neutrons along the beam axis in the space outside the reactor, and evaluation of the absolute value of the flux at the place where the beam comes out from the biological shield are given (author)

  4. Activity of the RA Reactor Physics group in 1980 - Definition of the Operation conditions for future safe and economical RA reactor operation with 80% enriched fuel; Prilog Ia - Rad sluzbe za fiziku reaktora RA u 1980. godini - Definisanje pogonskih uslova za dalji siguran i ekonomican rad reaktora RA sa 80% obogacenim gorivom

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1980-12-15

    During 1980. the RA reactor was not in operation. That is why this period was devoted to definition of operating conditions for further reactor operation with 80% enriched fuel. The fuel elements which were in the core at the moment of shutdown in March 1979will not be used again (388 80% enriched fuel elements, and 511 2% enriched fuel elements). The reactor will be operated only with 80% enriched fuel, staring with initiat core configuration with 440 elements on the borders gradually changing to equi;librium core with 720 fuel elements. The analyses were concerned with safety issues of future operation. [Serbo-Croat] Reaktor RA tokom 1980 godine nije radio. Zbog toga je ovaj period iskoriscen za intenzivan rad na definisanju pogonskih uslova za dalji rad reaktora sa 80% obogacenim gorivom. Gorivo sa kojim je reaktor prestao da radi marta 1979. godine (388 gorivnih elemenata 80% obogacenoh i 511 elementa 2% obogaceno) nece biti vraceno u jezgro, vec ce reaktor raditi samo sa 80% obogacenim gorivom, pocev od konfiguracije sa 440 elemenata na periferiji do ravnotezne konfiguracije sa 720 elemenata. Sve nalize su se bavile sigurnosnim aspektima rada reaktora sa visokoobogacenim gorivom u jezgru.

  5. Determination of the neutron spectrum at different locations in the Argentine RA-1 Reactor

    International Nuclear Information System (INIS)

    Lerner, A.M.; Madariaga, M.R.

    1998-01-01

    Full text: It is well known that the RA-1 reactor is used to irradiate different types of materials with neutrons. The Radio dosimetry Group (which belongs to the Nuclear Regulatory Authority) uses its fast column for the design, calibration and set up of criticality dosimeters as well as for a quick assessment of the dose to workers in case of an accident. With such purpose, Au(1), Au under Cd and In(2) foils were irradiated to estimate absolute thermal, epithermal and fast neutron fluxes at the irradiation location. The accuracy of this estimation is higher when the response to the present neutron spectrum of the different materials constituting the detectors is better known. This, in turn, requires the previous knowledge of such spectrum (a detailed energy dependence of neutron flux) at the analysed location. In this work a neutronic calculation is presented at the fast irradiation location. The whole calculation was carried out following two different methodologies, and considering a power of 40 kW. The reactor and its surroundings were represented by a simplified one-dimensional model, as a concentric cylindrical set of regions. Figures are drawn representing fast and thermal fluxes (with the cut at 0.4 eV) as a function of the distance to the core centre. The neutron flux (in n/cm 2 sec.eV) as a function of energy is also shown at the fast irradiation location. Values of flux (in n/cm 2 .sec.eV) are also provided as a function of energy in other typical locations, as well as the equivalent integrated flux values (in n/cm 2 .sec). ((1) According to the reaction Au 197 (n,γ)Au 198 , having a cross section of σ 0 =98.8b for thermal neutrons. (2) According to the reaction In 115 (n,n')In 115m , with a cross section of some 70 mb for neutrons with energies above 1.2MeV). (author) [es

  6. Project requirements for reconstruction of the RA reactor ventilation system, Task 2.8. Measurement of radioactive iodine and other isotopes contents in the gas system of the RA reactor, Annex of the task

    International Nuclear Information System (INIS)

    Vujisic, Lj. et al

    1981-01-01

    This report is a supplement to the task 2.8. When planning and constructing the ventilation system, it was found that it is necessary to perform additional experiments during RA reactor operation at 2 MW power level for a longer period. In addition to the helium system, the potential source of radioactive pollutants is the space below the upper water shielding of the reactor. All the experimental and fuel channels are ending in this space. During repair and fuel exchange radioactivity can be released in this space. For that reason this space is important when planing and designing the filtration system for incidental conditions or planned dehermetisation of the reactor. The third point where radioactive isotope identification was done, was the entrance into the chimney during steady state operation and planned dehermetisation of the reactor. The following samples were measured: gas system during reactor operation at 2 MW power; entrance into the chimney during last 48 hours of reactor operation at 2 MW power; sample on the platform under the upper water shield with the opened fuel channel after the reactor shutdown; and simultaneously with the latter, measurement at the entrance to the chimney. This annex contains the list of identified radioactive isotopes, volatile and gaseous as well as concentration of volatile 131 I on the adsorbents [sr

  7. Fuels for Canadian research reactors

    International Nuclear Information System (INIS)

    Feraday, M.A.

    1993-01-01

    This paper includes some statements and remarks concerning the uranium silicide fuels for which there is significant fabrication in AECL, irradiation and defect performance experience; description of two Canadian high flux research reactors which use high enrichment uranium (HEU) and the fuels currently used in these reactors; limited fabrication work done on Al-U alloys to uranium contents as high as 40 wt%. The latter concerns work aimed at AECL fast neutron program. This experience in general terms is applied to the NRX and NRU designs of fuel

  8. Power reactor core safety research

    International Nuclear Information System (INIS)

    Rim, C.S.; Kim, W.C.; Shon, D.S.; Kim, J.

    1981-01-01

    As a part of nuclear safety research program, a project was launched to develop a model to predict fuel failure, to produce the data required for the localizaton of fuel design and fabrication technology, to establish safety limits for regulation of nuclear power plants and to develop reactor operation method to minimize fuel failure through the study of fuel failure mechanisms. During 1980, the first year of this project, various fuel failure mechanisms were analyzed, an experimental method for out-of-pile tests to study the stress corrosion cracking (SCC) behaviour of Zircaloy cladding underiodine environment was established, and characteristics of PWR and CANDU Zircaloy specimens were examined. Also developed during 1980 were the methods and correlations to evaluate fuel failures in the reactor core based on operating data from power reactors

  9. Design project of the dosimetry control system in the independent CO2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels, Vol. V

    International Nuclear Information System (INIS)

    1964-01-01

    Design project of the dosimetry control system in the independent CO 2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels includes the following: calculations of CO 2 gas activity, design of the dosimetry control system, review of the changes that should be done in the RA reactor building for installing the independent CO 2 loop, specification of the materials with cost estimation, engineering drawings of the system [sr

  10. Research for enhancing reactor safety

    International Nuclear Information System (INIS)

    1989-05-01

    Recent research for enhanced reactor safety covers extensive and numerous experiments and computed modelling activities designed to verify and to improve existing design requirements. The lectures presented at the meeting report GRS research results and the current status of reactor safety research in France. The GRS experts present results concerning expert systems and their perspectives in safety engineering, large-scale experiments and their significance in the development and verification of computer codes for thermohydraulic modelling of safety-related incidents, the advanced system code ATHLET for analysis of thermohydraulic processes of incidents, the analysis simulator which is a tool for fast evaluation of accident management measures, and investigations into event sequences and the required preventive emergency measures within the German Risk Study. (DG) [de

  11. Dosimetry and radiation shielding at the RA reactor, Annual report 1975, Annex 5; Prilog 5 - Dozimetrija i tehnicka zastita

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    In the working environment at the RA reactor, the level of gamma radiation is measured continuously by the built-in stationary system. According to the needs, measurement are done in the reactor hall every day. The level of gamma radiation is measured separately in typical points when the reactor is operated at nominal power and during intervals between two operating campaigns. The level of neutron radiation is measured according to the needs by means of a mobile spherical neutron detector. These measurements are done in the reactor hall around the horizontal experimental channels. Measured values of neutron radiation are three times lower than the relevant levels of gamma radiation. [Serbo-Croat] Na reaktoru RA vrsi se stalna kontrola nivoa gama zracenja po tehnoloskim i radnim prostorijama, pomocu ugradjenog stacionarnog sistema. Svakodnevno se vrse merenja u reaktorskoj hali, prema ukazanim potrebama. Posebno se mere nivoi gamma zracenja u karakteristicnim tackama pri radu reaktora na nominalnoj snazi i u pauzama izmedju dva kampanje. Merenje nivoa neutronskog zracenja vrsi se diskontinualno pomocu mobilnog sfernog neutronskog dozimetra. Merenja se obavljaju u hali oko horizontalnih eksperimentalnih kanala. Izmerene vrednosti su u proseku tri puta manje od odgovarajucih nivoa gama zracenja.

  12. Research reactor's role in Korea

    International Nuclear Information System (INIS)

    Choi, C-O.

    1995-01-01

    After a TRIGA MARK-II was constructed in 1962, new research activity of a general nature, utilizing neutrons, prevailed in Korea. Radioisotopes produced from the MARK-II played a good role in the 1960's in educating people as to what could be achieved by a neutron source. Because the research reactor had implanted neutron science in the country, another TRIGA MARK-III had to be constructed within 10 years after importing the first reactor, due to increased neutron demand from the nuclear community. With the sudden growth of nuclear power, however, the emphasis of research changed. For a while research activities were almost all oriented to nuclear power plant technology. However, the specifics of nuclear power plant technology created a need for a more highly capable research reactor like HANARO 30MWt. HANARO will perform well with irradiation testing and other nuclear programs in the future, including: production of key radioisotopes, doping of silicon by transmutation, neutron activation analysis, neutron beam experiments, cold neutron source. 3 tabs., 2 figs

  13. The research reactor TRIGA Mainz

    International Nuclear Information System (INIS)

    Hampel, G.; Eberhardt, K.; Trautmann, N.

    2006-01-01

    The TRIGA Mark II reactor at the Institut fuer Kernchemie became first critical on August 3 rd , 1965. It can be operated in the steady state mode with a maximum power of 100 kWth and in the pulse mode with a peak power of 250 MWth. A survey of the research programmes performed at the TRIGA Mainz is given covering applications in basic research as well as applied science in nuclear chemistry and nuclear physics. Furthermore, the reactor is used for neutron activation analysis and for education and training of scientists, teachers, students and technical personal. Important projects for the future of the TRIGA Mainz are the UCN (ultra cold neutrons) experiment, fast chemical separation, medical applications and the use of the NAA as well as the use of the reactor facility for the training of students in the fields of nuclear chemistry, nuclear physics and radiation protection. Taking into account the past and future operation schedule and the typically low burn-up of TRIGA fuel elements (∝4 g U-235/a), the reactor can be operated for at least the next decade taking into account the fresh fuel elements on stock and without changing spent fuels. (orig.)

  14. Dosimetry and technical radiation protection at the RA Reactor - Report for 1977, Annex V; Prilog V - Dozimetrija i tehnicka zastita od zracenja kod reaktora RA - Izvestaj za 1977. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1977-12-15

    This report includes data about the level of gamma and neutron radiation, and level of contamination in the working environment at the RA reactor, data about collective and individual exposure of the staff to radiation, data about contamination and decontamination as well as radioactive waste. During 1977, at the RA reactor there was no accident that would cause significant exposure of tf the staff or contamination of the working space and the environment of the reactor. [Serbo-Croat] Ovaj Izvestaj sadrzi podatke o nivou gama i neutronskog zracenja i stepenu kontaminacije radne sredine, podatke o individualnom i kolektivnom izlaganju zracenju radnog osoblja, podatke o kontaminaciji i dekontaminaciji kao i o radioaktivnom otpadu. U toku 1977. godine, na reaktoru RA nije bilo akcidenata vecih razmera koji bi za posledice imali znacajnije ozracivanje radnog osoblja i kontaminaciju radne sredine i okoline.

  15. Activities needed for exploitation of the RA reactor I-IV, Part III, IZ-093-0103-1961; Radovi za potrebe eksploatacije raktora RA - I-IV - III deo, IZ-093-0103-1961

    Energy Technology Data Exchange (ETDEWEB)

    Jurida, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    For the purpose of designing the low-temperature loop at the RA reactor, a list of materials that would be irradiated in the reactor was made. This document includes a review of the radiochemistry data for the listed materials and data about thermal stability of the mentioned materials. Calculation of heat generated in listed samples was based on the theoretical and experimental results of radiation characteristics of the RA reactor. Maximum temperature values in the samples without forced cooling are calculated. [Serbo-Croat] Za potrebe projektovanja niskotemperaturne petlje na reaktoru RA nacinjen je pregled materijala za ozracivanje u reaktoru. Ovaj dokument sadrzi pregled radiajaciono hemijskih podataka za navedene materijale i podatke o termickoj stabilnosti pomenutih materijala. Toplota generisana u navedenim uzorcima racunata je uzimajuci u obzir osnovne podatke teorijske i eksperimentalne rezultate odredjivanja karakteristika zracenja u reaktoru. Izracunate su maksimalne temperature u uzorcima bez prinudnog hladjenja.

  16. New research reactor for Australia

    International Nuclear Information System (INIS)

    Miller, R.

    1992-01-01

    HIFAR, Australia's major research reactor was commissioned in 1958 to test materials for an envisaged indigenous nuclear power industry. HIFAR is a Dido type reactor which is operated at 10 MW. With the decision in the early 1970's not to proceed to nuclear power, HIFAR was adapted to other uses and has served Australia well as a base for national nuclear competence; as a national facility for neutron scattering/beam research; as a source of radioisotopes for medical diagnosis and treatment; and as a source of export revenue from the neutron transmutation doping of silicon for the semiconductor industry. However, all of HIFAR's capabilities are becoming less than optimum by world and regional standards. Neutron beam facilities have been overtaken on the world scene by research reactors with increased neutron fluxes, cold sources, and improved beams and neutron guides. Radioisotope production capabilities, while adequate to meet Australia's needs, cannot be easily expanded to tap the growing world market in radiopharmaceuticals. Similarly, neutron transmutation doped silicon production, and export income from it, is limited at a time when the world market for this material is expanding. ANSTO has therefore embarked on a program to replace HIFAR with a new multi-purpose national facility for nuclear research and technology in the form of a reactor: a) for neutron beam research, - with a peak thermal flux of the order of three times higher than that from HIFAR, - with a cold neutron source, guides and beam hall, b) that has radioisotope production facilities that are as good as, or better than, those in HIFAR, c) that maximizes the potential for commercial irradiations to offset facility operating costs, d) that maximizes flexibility to accommodate variations in user requirements during the life of the facility. ANSTO's case for the new research reactor received significant support earlier this month with the tabling in Parliament of a report by the Australian Science

  17. Research Reactors Types and Utilization

    International Nuclear Information System (INIS)

    Abdelrazek, I.D.

    2008-01-01

    A nuclear reactor, in gross terms, is a device in which nuclear chain reactions are initiated, controlled, and sustained at a steady rate. The nuclei of fuel heavy atoms (mostly 235 U or 239 Pu), when struck by a slow neutron, may split into two or more smaller nuclei as fission products,releasing energy and neutrons in a process called nuclear fission. These newly-born fast neutrons then undergo several successive collisions with relatively low atomic mass material, the moderator, to become thermalized or slow. Normal water, heavy water, graphite and beryllium are typical moderators. These neutrons then trigger further fissions, and so on. When this nuclear chain reaction is controlled, the energy released can be used to heat water, produce steam and drive a turbine that generates electricity. The fission process, and hence the energy release, are controlled by the insertion (or extraction) of control rods through the reactor. These rods are strongly neutron absorbents, and thus only enough neutrons to sustain the chain reaction are left in the core. The energy released, mostly in the form of heat, should be continuously removed, to protect the core from damage. The most significant use of nuclear reactors is as an energy source for the generation of electrical power and for power in some military ships. This is usually accomplished by methods that involve using heat from the nuclear reaction to power steam turbines. Research reactors are used for radioisotope production and for beam experiments with free neutrons. Historically, the first use of nuclear reactors was the production of weapons grade plutonium for nuclear weapons. Currently all commercial nuclear reactors are based on nuclear fission. Fusion power is an experimental technology based on nuclear fusion instead of fission.

  18. Neutron magnetic scattering experiments performed by VIKRA group at the RA reactor in Vinca; Eksperimenti grupe VIKRA na reaktoru RA u Vinci sa rasejanjem neutrona na magnetnim materijalima

    Energy Technology Data Exchange (ETDEWEB)

    Kranicki, S; Rzany, H; Wanic, A [Institute of Nuclear Physics, Krakov (Poland); Szytula, A [Jagiellonian University, Krakov (Poland); Todorovic, J; Dimitrijevic, Z; Radenkovic, S [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1978-05-15

    A short communication about investigations of magnetic materials by means of the neutron magnetic scattering performed by Polish-Yugoslav group VIKRA (Vinca-Krakov) at the RA reactor in Vinca in the period 1962-1977 will be presented. In the field of neutron inelastic scattering information about magnetic interactions (exchange integrals) and their temperature behaviour in such substances as Fe{sub 7}S{sub 8}, {alpha}-Fe{sub 2}O{sub 3}, CR{sub 2}O{sub 3}, {alpha}-Co, Cu{sub 2}MnAl and Mn{sub 1.88}Cr{sub 0.12}Sb was obtained by measuring magnon dispersion relations. In the field of neutron elastic scattering valuable results concerning crystallographic and magnetic structures of oxyhydroxides, several Heusler alloys and intermetallic compounds of 3d metals (for instance of NiMnGe, CoMnSi) were obtained. A short description of the KSN spectrometer used in all experiments will also be given. (author) Dato je kratko saopstenje o istrazivanjima magnetnih materijala magnetnim neutronskim rasejanjem izvrsenim od strane poljsko-jugoslovenske grupe VIKRA (Vinca-Krakov) na reaktoru RA u Vinci u periodu od 1962-1977. U oblasti neelasticnog rasejanja neutrona, obavestenja o magnetnim uzajamnim dejstvima (integralima izmene) i njihovim temperaturskim ponasanjima su dobijeni merenjem disperzione relacije magnona u takvim materijalima kao sto su Fe{sub 7}S{sub 8}, {alpha}-Fe{sub 2}O{sub 3}, CR{sub 2}O{sub 3}, {alpha}-Co, Cu{sub 2}MnAl and Mn{sub 1.88}Cr{sub 0.12}Sb. U oblasti neutronskog elasticnog rasejanja dobijeni su korisni rezultati o kristalografskim i magnetnim strukturama oksihidroksida gvozdja, niza Heuslerovih legura i intermetalnih jedinjenja 3d metala (napr. NiMnGe, Co,MnSi). Dat je kratak opis KSN spektrometra upotrebljenog u svim ovim eksperimentima. (author)

  19. Radiation protection at the RA Reactor in 1985, Part -3, Removal and treatment of radioactive effluents for the needs of RA reactor

    International Nuclear Information System (INIS)

    Plecas, I.; Vukovic, Z.; Kostadinovic, A.

    1985-01-01

    Contaminated water originates from: hot cells, heavy water distillation device, storage pools for cooling and cutting of fuel elements, water biological shield of the reactor. During 1985 5 m of contaminated water was released from hot cells in the VR-pool containing highly radioactive waste water with 60 Co and trace amount of fission products [sr

  20. Directory of Nuclear Research Reactors 1994

    International Nuclear Information System (INIS)

    1995-08-01

    The Directory of Nuclear Research Reactors is an output of the Agency's computerized Research Reactor Data Base (RRDB). It contains administrative, technical and utilization information on research reactors known to the Agency at the end of December 1994. The data base converted from mainframe to PC is written in Clipper 5.0 and the publication generation system uses Excel 4. The information was collected by the Agency through questionnaires sent to research reactor owners. All data on research reactors, training reactors, test reactors, prototype reactors and critical assemblies are stored in the RRDB. This system contains all the information and data previously published in the Agency's publication, Directory of Nuclear Research Reactor, as well as updated information

  1. RASI Update: Research for RA In-Service Education.

    Science.gov (United States)

    Dickson, Gary L.; And Others

    1981-01-01

    Reports results of applied research with the Resident Assistant Stress Inventory. Concluded that sex, personality, job performance, experience, stress management training, and housing characteristics affect perceived anxiety among resident assistants. Suggests additional research is needed for planning inservice education programs. (JAC)

  2. Research reactors in Austria - Present situation

    International Nuclear Information System (INIS)

    Boeck, H.; Musilek, A.; Villa, M.

    2005-01-01

    In the past decades Austria operated three research reactors, the 10 MW ASTRA reactor at Seibersdorf, the 250 kW TRIGA reactor at the Atominstitut and the 1 kW Argonaut reactor at the Technical University in Graz. Since the shut down of the ASTRA on July 31th, 1999 and its immediate decommissioning reactor and the shut down of the Argonaut reactor in Graz on August 31st, 2004 only one reactor remains operational for keeping nuclear competence in Austria which is the 250 kW TRIGA Mark II reactor. (author)

  3. Accident analysis in research reactors

    International Nuclear Information System (INIS)

    Adorni, M.; Bousbia-salah, A.; D'Auria, F.; Hamidouche, T.

    2007-01-01

    With the sustained development in computer technology, the possibilities of code capabilities have been enlarged substantially. Consequently, advanced safety evaluations and design optimizations that were not possible few years ago can now be performed. The challenge today is to revisit the safety features of the existing nuclear plants and particularly research reactors in order to verify that the safety requirements are still met and - when necessary - to introduce some amendments not only to meet the new requirements but also to introduce new equipment from recent development of new technologies. The purpose of the present paper is to provide an overview of the accident analysis technology applied to the research reactor, with emphasis given to the capabilities of computational tools. (author)

  4. Reactor safety research in Sweden

    International Nuclear Information System (INIS)

    Pershagen, B.

    1980-02-01

    Objectives, means and results of Swedish light water reactor safety research during the 1970s are reviewed. The expenditure is about 40 Million Swkr per year excluding industry. Large efforts have been devoted to experimental studies of loss of coolant accidents. Large scale containment response tests for simulated pipe breaks were carried out at the Marviken facility. At Studsvik a method for testing fuel during fast power changes has been developed. Stress corrosion, crack growth and the effect of irradiation on the strength ductility of Zircaloy tube was studied. A method for determining the fracture toughness of pressure vessel steel was developed and it was shown that the fracture toughness was lower than earlier assumed. The release of fission products to reactor water was studied and so was the release, transport and removal of airborne radioactive matter for Swedish BWRs and PWRs. Test methods for iodine filter systems were developed. A system for continuous monitoring of radioactive noble gas stack release was developed for the Ringhals plant. Attention was drawn to the importance of the human factor for reactor safety. Probabilistic methods for risk analysis were applied to the Barsebaeck 2 and Forsmark 3 boiling water reactors. Procedures and working conditions for operator personnel were investigated. (GBn)

  5. Nuclear instrumentation for research reactors

    International Nuclear Information System (INIS)

    Hofer, Carlos G.; Pita, Antonio; Verrastro, Claudio A.; Maino, Eduardo J.

    1997-01-01

    The nuclear instrumentation for research reactors in Argentina was developed in 70'. A gradual modernization of all the nuclear instrumentation is planned. It includes start-up and power range instrumentation, as well as field monitors, clamp, scram and rod movement control logic. The new instrumentation is linked to a computer network, based on real time operating system for data acquisition, display and logging. This paper describes the modules and whole system aspects. (author). 2 refs

  6. Research reactor developments in Australia

    International Nuclear Information System (INIS)

    Godfrey, Robert

    1998-01-01

    The Australian Nuclear Science and Technology Organization (ANSTO) operates the 10 MW research reactor, HIFAR, at the Lucas Heights site approximately 30 kilometres south of Sydney. Although recent reviews and inspections have confirmed that HIFAR operates safely by an adequate margin and has minimal impact, it was concluded that the reactor design and age places limitations on its operation and utilization, and that HIFAR is approaching the end of its economic life. In September 1997, a decision was made by the Australian Government to found ANSTO for the construction of a replacement research on the existing Lucas Heights site, subject to the requisite environmental assessment process. A draft EIS has been prepared and is currently undergoing public review. A design specification is in preparation, and a research reactor vendor pre-qualification process has been initiated. Spent fuel shipments have been made to Dounreay and to the Savannah River Site, and discussions are continuing regarding the disposition of the existing spent fuel and that arising form HIFAR's remaining operation. (author)

  7. Radiation protection at the RA reactor in 1984, Part III Removal of the liquid radioactive effluents for the needs of the RA reactor

    International Nuclear Information System (INIS)

    Mandic, M.; Plecas, I.; Vukovic, Z.; Knezevic, Lj.; Jankovic, O.; Kostadinovic, A.; Mihailovic, B.

    1984-01-01

    Contaminated water originates from: hot cells, heavy water distillation device, storage pools for cooling and cutting of fuel elements, water biological shield of the reactor. During 1984, 400 liters of water contaminated by 60 Co was treated. Most recent measurements showed that the VR-1 pool contains 280 m 3 of effluents having specific activity of 3.3 10 4 Bq/ml, and VR-2 contains 30 m 3 with specific activity of 4 10 3 Bq/ml

  8. Design and construction of multi research reactor

    International Nuclear Information System (INIS)

    1985-05-01

    This is the report about design and construction of multi research reactor, which introduces the purpose and necessity of the project, business contents, plan of progress of project and budget for the project. There are three appendixes about status of research reactor in other country, a characteristic of research reactor, three charts about evaluation, process and budget for the multi research reactor and three drawings for the project.

  9. Research nuclear reactor operation management

    International Nuclear Information System (INIS)

    Preda, M.; Carabulea, A.

    2008-01-01

    Some aspects of reactor operation management are highlighted. The main mission of the operational staff at a testing reactor is to operate it safely and efficiently, to ensure proper conditions for different research programs implying the use of the reactor. For reaching this aim, there were settled down operating plans for every objective, and procedure and working instructions for staff training were established, both for the start-up and for the safe operation of the reactor. Damages during operation or special situations which can arise, at stop, start-up, maintenance procedures were thoroughly considered. While the technical skill is considered to be the most important quality of the staff, the organising capacity is a must in the operation of any nuclear facility. Staff training aims at gaining both theoretical and practical experience based on standards about staff quality at each work level. 'Plow' sheet has to be carefully done, setting clear the decision responsibility for each person so that everyone's own technical level to be coupled to the problems which implies his responsibility. Possible events which may arise in operation, e.g., criticality, irradiation, contamination, and which do not arise in other fields, have to be carefully studied. One stresses that the management based on technical and scientific arguments have to cover through technical, economical and nuclear safety requirements a series of interlinked subprograms. Every such subprograms is subject to some peculiar demands by the help of which the entire activity field is coordinated. Hence for any subprogram there are established the objectives to be achieved, the applicable regulations, well-defined responsibilities, training of the personnel involved, the material and documentation basis required and activity planning. The following up of positive or negative responses generated by experiments and the information synthesis close the management scope. Important management aspects

  10. Radiation protection at the RA nuclear reactor in 1987, Part II.a. Control of radioactivity in the environment of the RA nuclear reactor (precipitation, fallout, water, soil, plants, fruit)

    International Nuclear Information System (INIS)

    Martic, M.; Ajdacic, N.; Jovanovic, J.

    1987-01-01

    Control of radioactivity in the biosphere in the vicinity of the RA reactor is part of the radioactivity control done regularly for the whole territory of the Vinca Institute. According to the measurements during 1987 it was found that the total contamination of the precipitation was highest in January compared to the period before Chernobylsk accident. Mean monthly value of the total beta cavity was highest in April 5.41 times higher than the relevant value in 1986. This is a preliminary report, the measurement data will be presented after after analysis in the annual report [sr

  11. Bulletin of the Research Laboratory for Nuclear Reactors

    International Nuclear Information System (INIS)

    Aritomi, Masanori

    2008-01-01

    The bulletin consists of two parts. The first part includes General Research Report. The Research Laboratory for Nuclear Reactors, Tokyo Institute of Technology has three engineering divisions such as Energy Engineering, Mass Transmutation Engineering, and System and Safety Engineering. In this part, 17 reports of Energy Engineering division, 8 reports of Mass transmutation Engineering division, 11 reports of System and Safety Engineering division are described as their activities. In addition, 3 reports of Cooperative Researches are also summarized. The second part is Special Issue about COE-INES RESEARCH REPORT 2007. In this part, 3 reports of Innovative Reactor Group, 2 reports of Innovative Nuclear Energy Utilization System Group, 3 reports of Innovative Transmutation/Separation Group, 2 reports of Relationship between Nuclear and Society Group, 1 report of RA Students in the COE-INES Captainship Educational Program are described as results to their researches. (J.P.N.)

  12. Current status of the world's research reactors

    International Nuclear Information System (INIS)

    Dodd, B.

    1999-01-01

    Data from the IAEA's Research Reactor Database (RRDB) provides information with respect to the status of the world's research reactors. Some summary data are given. Recent initiatives by the IAEA regarding communications and information flow with respect to research reactors are discussed. Future plans and perspectives are also introduced. (author)

  13. Decommissioning of Salaspils Research Reactor

    International Nuclear Information System (INIS)

    Abramenkovs, A.; Popelis, A.; Abramenkova, G

    2008-01-01

    The Salaspils Research Reactor (SRR) is out of operation since July 1998 and the decommissioning of SRR was started in 1999 according to the decision of the Government of Latvia. The main decommissioning activities up to 2006 were connected with collecting and conditioning of historical radioactive wastes from different storages outside and inside of reactor hall. The total amount of dismantled materials was about 700 tons, more than 77 tons were conditioned in concrete containers for disposal in repository. The radioactive wastes management technology is discussed in the paper. It was found, that additional efforts must be spent for immobilization of radionuclides in cemented matrix to be comply with the wastes acceptance criteria. The investigations of mechanical stability of water-cement matrix are described and discussed in the paper

  14. Myrrha, new polyvalent research reactor

    International Nuclear Information System (INIS)

    Khatcheressian, Nayiri; Haj Tahar, Malek

    2015-01-01

    Myrrha (Multi-purpose hybrid research reactor for high-tech applications) is the first prototype of sub-critical nuclear reactor driven by a particle accelerator (an ADS, accelerator-driven system) at semi-industrial scale (50-100 MW), a safe and easy-to-control technology. In an interview, the manager of this project recalls his curriculum, presents and comments the characteristics of Myrrha, outlines why these ADS are so interesting to produce radio-isotopes, comments the variety of countries and companies involved in this project, outlines the peculiarities of Myrrha in terms of safety and the main technological challenges (a mixing of lead and bismuth for the coolant, control of corrosion by oxygen, an improved reliability based on redundant design and fault tolerance, MOX as fuel). He also evokes competing technologies

  15. RA reactor operation and maintenance in 1990 with comparative evaluation from 1986-1990, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1990. godini, uz uporedni pregled za period 1986-1990. godina

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Vasovic, B; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1990-12-15

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The new emergency cooling system and the reconstruction of the existing ventilation system were finished in 1989, the conditions for further reactor operation were fulfilled. In the meantime new licensing regulations adopted in 1988 were not demanding the mentioned conditions for reactors operated at power less than 10MW, RA reactor power being 6.5 MW. But the reactor could not be restarted due to planned renewal of the reactor instrumentation. It is planned to exchange the complete instrumentation by the end of 1991. Training program for the staff operating and maintaining the reactor components was prepared in 1985. Reconstruction, modification and construction of components demanded new documentation needed for further safe reactor operation. New version of RA reactor safety report was finished in 1986 according to the recommendations of IAEA and licensing regulations of Yugoslavia. In 1989, new documents were written covering regulations and instructions for reactor operation. The new reactor experimental loop was designed in 1986, and constructed and tested in 1990. All the reactor components were maintained by specific reactor services. Financing of the reactor remains a permanent problem. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula 1984. godine Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Radovi na izgradnji sistema za udesno hladjenje i rekonstrukciji postojeceg sistema specijalne ventilacije zavrseni su 1989. godine. Uslovi za nastavak rada reaktora

  16. Safety analysis for testing operation of the RA reactor in the Boris Kidric Institute, Vinca; Analiza sigurnosti rada reaktora 'RA' za probni rad u Institutu za nuklearne nauke 'Boris Kidric' - Vinca

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1980-09-15

    This safety report covers detailed description of the RA reactor core, reactor components, coolant system, control system, safety system, reactor building including site characteristics. A separate chapter is devoted to radiation protection and radioactive waste management. Organizational structure od the reactor staff as well as training program are included. The last chapter includes detailed emergency plans for three accidents classified in three categories. [Serbo-Croat] Ovaj izvestaj sadrzi detaljan opis reaktora RA, sistema za hladjenje, kontolno-sigurnosnog sistema, elektricnog sistema, zgrade sa instalacijama, ukljucujuci karakteristike lokacije. Posebno poglavlje opisuje sistem zastite od zracenja i rukovanje radioaktivnim otpadom. Opisana je organizacija rada i program obuke osoblja. Poslednje poglavlje sadrzi detaljan plan mera za slucaj udesa klasifikovanih u tri kategorije.

  17. RA reactor safety analysis I-III, Part III - Environmental effect of the maximum credible accident; Analiza sigurnosti rada Reaktora RA I-III, III deo - Posledica maksimalno moguceg akcidenta na okolinu reaktora

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    The objective of the maximum credible accident analysis was to determine the integral radiation doses in the vicinity of the reactor and in the environment. In case of RA reactor the maximum credible accident, meaning release of the fission products, would be caused by fuel elements meltdown. This analysis includes the following calculation results: activity of the fission products, volatility of the fission products, concentration of radioactive materials in the air, analysis of the accident environmental effects.

  18. Report on participation of the operational dosimetry division in refurbishment of the RA reactor, Task 3.08/04-13

    International Nuclear Information System (INIS)

    Ninkovic, M.

    1963-01-01

    During the refurbishment of the RA reactor, from January to June 1963 the division of operational division had a very important role and comprehensive tasks. To enable safety of the staff it was necessary to provide protection clothes, personnel dosemeters; permanent monitoring of radiation doses; strict control of the procedures for completing the planned maintenance and repair operations to avoid contamination of the personnel and working space. The refurbishment activities described in this report are: removal of fuel from the core; refurbishment of the heavy water system; decontamination of the distillation equipment; repair of the gas system

  19. Training and Certification of Research Reactor Personnel

    International Nuclear Information System (INIS)

    Zarina Masood

    2011-01-01

    The safe operation of a research reactor requires that reactor personnel be fully trained and certified by the relevant authorities. Reactor operators at PUSPATI TRIGA Reactor underwent extensive training and are certified, ever since the reactor first started its operation in 1982. With the emphasis on enhancing reactor safety in recent years, reactor operator training and certification have also evolved. This paper discusses the changes that have to be implemented and the challenges encountered in developing a new training programme to be in line with the national standards. (author)

  20. Actions needed for RA reactor exploitation - I-IV, Part II, Design project VI-SA 1, Experimental loop for testing the EL-4 reactor fuel elements in the central vertical experimental channel of the RA reactor in Vinca; Radovi za potrebe eksploatacije reaktora RA - I-IV, II Deo, Predprojekat VI-SA 1, Petlja za ispitivanje gorivnih elemenata reaktora EL-4 u centralnom vertikalnom eksperimentalnom kanalu reaktora RA u Vinci

    Energy Technology Data Exchange (ETDEWEB)

    Novakovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    The objective of installing the VISA-1 loop was testing the fuel elements of the EL-4 reactor. The fuel elements planned for testing are natural UO{sub 2} with beryllium cladding, cooled by CO{sub 2} under nominal pressure of 60 at and temperature 600 deg C. central vertical experimental channel of the RA reactor was chosen for installing a test loop cooled by CO{sub 2}. This report contains the detailed design project of the testing loop with the control system and safety analysis of the planned experiment.

  1. RA Reactor operation and maintenance (I-IX), Part III, Task 3.08/04-02 Refurbishment of the electrical equipment; Pogon i odrzavanje reaktora RA (I-IX), III Deo, Zadatak 3.08/04-02 Remont elektro opreme

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V; Nikolic, M; Poznanovic, B; Rajic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume contains detailed action plan for repair of electrical equipment of the RA reactor, the list of electrical equipment parts which were either repaired or exchanged for improvement of their performance. Detailed work describing the repair and maintenance work done of the listed equipment is part of this report. Equipment related to dosimetry and control systems are included as well.

  2. Safety of research reactors (Design and Operation)

    International Nuclear Information System (INIS)

    Dirar, H. M.

    2012-06-01

    The primary objective of this thesis is to conduct a comprehensive up-to-date literature review on the current status of safety of research reactor both in design and operation providing the future trends in safety of research reactors. Data and technical information of variety selected historical research reactors were thoroughly reviewed and evaluated, furthermore illustrations of the material of fuel, control rods, shielding, moderators and coolants used were discussed. Insight study of some historical research reactors was carried with considering sample cases such as Chicago Pile-1, F-1 reactor, Chalk River Laboratories,. The National Research Experimental Reactor and others. The current status of research reactors and their geographical distribution, reactor category and utilization is also covered. Examples of some recent advanced reactors were studied like safety barriers of HANARO of Korea including safety doors of the hall and building entrance and finger print identification which prevent the reactor from sabotage. On the basis of the results of this research, it is apparent that a high quality of safety of nuclear reactors can be attained by achieving enough robust construction, designing components of high levels of efficiency, replacing the compounds of the reactor in order to avoid corrosion and degradation with age, coupled with experienced scientists and technical staffs to operate nuclear research facilities.(Author)

  3. New research reactor proposed for Australia

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    A new research reactor has been proposed for construction within the next ten years, to replace the HIFAR reactor which operating capabilities have been over taken by later designs. This paper outlines the main research applications of the new reactor design and briefly examines issues related to its cost, economic benefits, safety and location

  4. Safety research for CANDU reactors

    International Nuclear Information System (INIS)

    Hancox, W.T.

    1982-10-01

    Continuing research to develop and verify computer models of CANDU-PHW reactor process and safety systems is described. It is focussed on loss-of-coolant accidents (LOCAs) because they are the precursors of more serious accidents. Research topics include: (i) fluid-dynamic and heat-transfer processes in the heat transport system during the blowdown and refilling phases of LOCAs; (ii) thermal and mechanical behaviour of fuel elements; (iii) thermal and mechanical behaviour of the fuel and the fuel-channel assembly in situations where the heavy-water moderator is the sink for decay heat produced in the fuel; (iv) chemical behaviour of fission gases that might be released into the reactor coolant and transported to the containment system; and (v) combustion of hydrogen-air-steam mixtures that would be produced if fuel temperatures were sufficiently high to initiate the zirconium-water reaction. The current status of the research on each of these topics is highlighted with particular emphasis on the conclusions reached to date and their impact on the continuing program

  5. Reliability studies in research reactors

    International Nuclear Information System (INIS)

    Albuquerque, Tob Rodrigues de

    2013-01-01

    Fault trees and event trees are widely used in industry to model and to evaluate the reliability of safety systems. Detailed analyzes in nuclear installations require the combination of these two techniques. This study uses the methods of FT (Fault Tree) and ET (Event Tree) to accomplish the PSA (Probabilistic Safety Assessment) in research reactors. According to IAEA (lnternational Atomic Energy Agency), the PSA is divided into Level 1, Level 2 and Level 3. At the Level 1, conceptually, the security systems perform to prevent the occurrence of accidents, At the Level 2, once accidents happened, this Level seeks to minimize consequences, known as stage management of accident, and at Level 3 accident impacts are determined. This study focuses on analyzing the Level 1, and searching through the acquisition of knowledge, the consolidation of methodologies for future reliability studies. The Greek Research Reactor, GRR-1, is a case example. The LOCA (Loss of Coolant Accident) was chosen as the initiating event and from it, using ET, possible accidental sequences were developed, which could lead damage to the core. Moreover, for each of affected systems, probabilities of each event top of FT were developed and evaluated in possible accidental sequences. Also, the estimates of importance measures for basic events are presented in this work. The studies of this research were conducted using a commercial computational tool SAPHIRE. Additionally, achieved results thus were considered satisfactory for the performance or the failure of analyzed systems. (author)

  6. External irradiation of the personnel operating the reactor RA at Vinca in the period 1963-1966

    International Nuclear Information System (INIS)

    Ninkovic, M.M.; Minincic, Z.

    1968-06-01

    The paper first gives a survey of the characteristic operations performed on the Vinca reactor RA in which most of the personnel become irradiated. Following is a schematic diagram of the irradiations in the period 1963-1966 in which the reactor was in continual operation. The surveys are given for each month and each year separately, while the irradiated personnel are grouped in several characteristic irradiation dose ranges. In this analysis special emphasis is given to a survey of irradiation of the personnel classified according to their profession, i.e. their post. This kind of analysis is indispensable in planning work, proper disposition of the personnel and undertaking special protective measures for reducing the irradiations (author) [sr

  7. Fuel elements of research reactors in China

    International Nuclear Information System (INIS)

    Zhou Yongmao; Chen Dianshan; Tan Jiaqiu

    1987-01-01

    This paper describes the current status of design, fabrication of fuel elements for research reactors in China, emphasis is placed on the technology of fuel elements for the High Flux Engineering Test Reactor (HFETR). (author)

  8. IAEA safety standards for research reactors

    International Nuclear Information System (INIS)

    Abou Yehia, H.

    2007-01-01

    The general structure of the IAEA Safety Standards and the process for their development and revision are briefly presented and discussed together with the progress achieved in the development of Safety Standards for research reactor. These documents provide the safety requirements and the key technical recommendations to achieve enhanced safety. They are intended for use by all organizations involved in safety of research reactors and developed in a way that allows them to be incorporated into national laws and regulations. The author reviews the safety standards for research reactors and details their specificities. There are 4 published safety standards: 1) Safety assessment of research reactors and preparation of the safety analysis report (35-G1), 2) Safety in the utilization and modification of research reactors (35-G2), 3) Commissioning of research reactors (NS-G-4.1), and 4) Maintenance, periodic testing and inspection of research reactors (NS-G-4.2). There 5 draft safety standards: 1) Operational limits and conditions and operating procedures for research reactors (DS261), 2) The operating organization and the recruitment, training and qualification of personnel for research reactors (DS325), 3) Radiation protection and radioactive waste management in the design and operation of research reactors (DS340), 4) Core management and fuel handling at research reactors (DS350), and 5) Grading the application of safety requirements for research reactors (DS351). There are 2 planned safety standards, one concerning the ageing management for research reactor and the second deals with the control and instrumentation of research reactors

  9. Nuclear Capacity Building through Research Reactors

    International Nuclear Information System (INIS)

    2017-01-01

    Four Instruments: •The IAEA has recently developed a specific scheme of services for Nuclear Capacity Building in support of the Member States cooperating research reactors (RR) willing to use RRs as a primary facility to develop nuclear competences as a supporting step to embark into a national nuclear programme. •The scheme is composed of four complementary instruments, each of them being targeted to specific objective and audience: Distance Training: Internet Reactor Laboratory (IRL); Basic Training: Regional Research Reactor Schools; Intermediate Training: East European Research Reactor Initiative (EERRI); Group Fellowship Course Advanced Training: International Centres based on Research Reactors (ICERR)

  10. Seismic research on graphite reactor core

    International Nuclear Information System (INIS)

    Lai Shigang; Sun Libin; Zhang Zhengming

    2013-01-01

    Background: Reactors with graphite core structure include production reactor, water-cooled graphite reactor, gas-cooled reactor, high-temperature gas-cooled reactor and so on. Multi-body graphite core structure has nonlinear response under seismic excitation, which is different from the response of general civil structure, metal connection structure or bolted structure. Purpose: In order to provide references for the designing and construction of HTR-PM. This paper reviews the history of reactor seismic research evaluation from certain countries, and summarizes the research methods and research results. Methods: By comparing the methods adopted in different gas-cooled reactor cores, inspiration for our own HTR seismic research was achieved. Results and Conclusions: In this paper, the research ideas of graphite core seismic during the process of designing, constructing and operating HTR-10 are expounded. Also the project progress of HTR-PM and the research on side reflection with the theory of similarity is introduced. (authors)

  11. Dosimetry and technical radiation protection at the RA reactor in 1979, Report on the project 'Operation and maintenance of the RA reactor'

    International Nuclear Information System (INIS)

    Ninkovic, M. et al.

    1979-12-01

    This report include the analysis of the dosimetry and technical radiation protection results collected during 1979. The first part shows the data about the fundamental exposure to radiation and the statistical review of the total number of measurements. The following are included as well: measured values of radioactive gases and aerosol contents in air; contamination level of surfaces, clothes and uncovered parts of the staff bodies. Analysis of the personnel exposure is presented in the second part of the report. It was stated that the maximum individual external dose was 9.5 mGy, and the exposure dose was 1/5 lower than the annual dose limit for all the exposed personnel. It was estimated that that the internal contamination is negligible compared to the external contamination. This statement was based on the frequency of tasks in the contaminated zones, undertaken control and protection measures, as well as on the evaluation of the expected internal contamination. Comparative evaluation of the occupational exposures is given for the past five years. This showed that the exposure in 1979 was approximately on the same level as the mean value during past four years. The third part of the report covers the numerical data about the quantity of the collected radioactive waste, total size of contaminated and decontaminated surfaces and number of decontaminated objects. A brief analysis of the accidents occurred during this year under regular reactor operating conditions, maintenance and repair is given at the end. It was stated that there has been no accident that would cause exposure higher than the prescribed limits or any significant contamination of the working space or environment. The more detailed analyses concerned with radiation protection aspects of the irregularities noticed on the nuclear fuel elements were described in the Annex. It was concluded that the mentioned problems did not cause any leaks. This was significant for planning and manipulating the

  12. Safety analysis of RA reactor operation, I-III, Part III - Environmental effect of the maximum credible accident; Analiza sigurnosti rada reaktora RA - I-III, III deo - Posledica maksimalno moguceg akcidenta na okolinu reaktora

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    Maximum credible accident at the RA reactor would consider release of fission products into the environment. This would result from fuel elements failure or meltdown due to loss of coolant. The analysis presented in this report assumes that the reactor was operating at nominal power at the moment of maximum possible accident. The report includes calculations of fission products activity at the moment of accident, total activity release during the accident, concentration of radioactive material in the air in the reactor neighbourhood, and the analysis of accident environmental effects.

  13. RB Research nuclear reactor, Annual report for 2007

    International Nuclear Information System (INIS)

    Milosevic, M.; Ljubenov, V.; Pesic, M.; Jevremovic, M.; Minic, D.; Sipka, Dj.

    2008-01-01

    Report on RB reactor operation during 2007 contains 3 parts. Part one contains a brief description of the reactor, reactor operation and operational capabilities, reactor components, relevant dosimetry and radiation protection issues, personnel and financial data. Part two is devoted to maintenance of the reactor components, namely, fuel, heavy water, reactor vessel, heavy water circulation system, absorption rods and heavy water level meters, maintenance of electronic, mechanical, electrical and auxiliary equipment. Part three contains data concerned with reactor operation during 2007. Majority of measurement were related to spent fuel from the RA reactor, safety of transportation containers and verification of relevant computer codes

  14. RB research reactor Safety Report

    International Nuclear Information System (INIS)

    Sotic, O.; Pesic, M.; Vranic, S.

    1979-04-01

    This RB reactor safety report is a revised and improved version of the Safety report written in 1962. It contains descriptions of: reactor building, reactor hall, control room, laboratories, reactor components, reactor control system, heavy water loop, neutron source, safety system, dosimetry system, alarm system, neutron converter, experimental channels. Safety aspects of the reactor operation include analyses of accident causes, errors during operation, measures for preventing uncontrolled activity changes, analysis of the maximum possible accident in case of different core configurations with natural uranium, slightly and highly enriched fuel; influence of possible seismic events

  15. Industrial structure at research reactor suppliers

    International Nuclear Information System (INIS)

    Roegler, H.-J.; Bogusch, E.; Friebe, T.

    2001-01-01

    Due to the recent joining of the forces of Framatome S. A. from France and the Nuclear Division of Siemens AG Power Generation (KWU) from Germany to a Joint Venture named Framatome Advanced Nuclear Power S.A.S., the issue of the necessary and of the optimal industrial structure for nuclear projects as a research reactor is, was discussed internally often and intensively. That discussion took place also in the other technical fields such as Services for NPPs but also in the field of interest here, i. e. Research Reactors. In summarizing the statements of this presentation one can about state that: Research Reactors are easier to build than NPPs, but not standardised; Research Reactors need a wide spectrum of skills and experiences; to design and build Research Reactors needs an experienced team especially in terms of management and interfaces; Research Reactors need background from built reference plants more than from operating plants; Research Reactors need knowledge of suitable experienced subsuppliers. Two more essential conclusions as industry involved in constructing and upgrading research reactors are: Research Reactors by far are more than a suitable core that generates a high neutron flux; every institution that designs and builds a Research Reactor lacks quality or causes safety problems, damages the reputation of the entire community

  16. Application of research reactors for radiation education

    International Nuclear Information System (INIS)

    Ito, Yasuo; Harasawa, Susumu; Hayashi, Shu A.; Tomura, Kenji; Matsuura, Tatsuo; Nakanishi, Tomoko M.; Yamamoto, Yusuke

    1999-01-01

    Nuclear research Reactors are, as well as being necessary for research purposes, indispensable educational tools for a country whose electric power resources are strongly dependent on nuclear energy. Both large and small research reactors are available, but small ones are highly useful from the viewpoint of radiation education. This paper oders a brief review of how small research reactors can, and must, be used for radiation education for high school students, college and graduate students, as well as for the public. (author)

  17. Application of research reactors for radiation education

    Energy Technology Data Exchange (ETDEWEB)

    Ito, Yasuo [Tokyo Univ. (Japan). Research Center for Nuclear Science and Technology; Harasawa, Susumu; Hayashi, Shu A.; Tomura, Kenji; Matsuura, Tatsuo; Nakanishi, Tomoko M.; Yamamoto, Yusuke

    1999-09-01

    Nuclear research Reactors are, as well as being necessary for research purposes, indispensable educational tools for a country whose electric power resources are strongly dependent on nuclear energy. Both large and small research reactors are available, but small ones are highly useful from the viewpoint of radiation education. This paper oders a brief review of how small research reactors can, and must, be used for radiation education for high school students, college and graduate students, as well as for the public. (author)

  18. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex B - Report of the Technology Service; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1985. godini - Prilog B - Izvestaj o radu tehnoloske sluzbe

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Vukadin, Z; Stosic, O; Cupac, S [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1985-12-01

    Technology service is established according to the need of unified technology control of the reactor, based on the organizational structure developed in USA, a part of which was applied at the Krsko NPP. Tasks of this service are: regular control and recording of operating reactor parameters under steady state and accidental conditions; control of chemical state of the reactor core (control of Ph values and electro conductivity of the heavy water and technical water); dosimetry parameters control and recording; safety and optimisation analyses when planning reactor core modifications; (changing the type of fuel, design of new components); cooperation with the reactor users during isotope production, activation analyses, application of neutron beams; participating in research programs; planning refueling. The most important task performed by this service was conversion of the core from 2% to 80% enriched fuel elements. A methodology for optimizing the reactor application was developed. Operation of the heavy water purification system, heavy water parameters, and operation of the gas system were controlled. Radiation and contamination levels in the working environment were measured, individual and collective doses. [Serbo-Croat] Tehnoloska sluzba uspostavljena je u skladu sa ispoljenim potrebama jedinstvene tehnoloske kontrole reaktora, oslanjajajucui se na organizacionu semu koja je razvijena u SAD, a cija je jedna varijanta primenjena na NE Krsko. Zadaci sluzbe su obavljanje sledecih zadataka: redovna kontrola i evidencija radnih parametara reaktora u redovnim i akcidentalnim uslovima; kontrola hemijskog rezima u reaktoru (kontrola PH vrednosti i elektroprovodnosti teske i tehnicke vode); kontrola i evidencija tehnicke dozimetrije; sigurnosne i optimizacione analize prilikom planiranja izmena na reaktoru (promene vrste goriva, izgradnja novih elemenata opreme); saradnja sa korisnicima reaktora prilikom prozivodnje izotopa, aktivacione analize, koriscenja

  19. Research reactors; Les piles de recherche

    Energy Technology Data Exchange (ETDEWEB)

    Kowarski, L [Commissariat a l' Energie Atomique, Paris (France). Centre d' Etudes Nucleaires; [Organisation europeenne pour la Recherche Nucleaire, Geneve (Switzerland)

    1955-07-01

    It brings together the techniques data which are involved in the discussion about the utility for a research institute to acquire an atomic reactor for research purposes. This type of decision are often taken by non-specialist people who can need a brief presentation of a research reactor and its possibilities in term of research before asking advises to experts. In a first part, it draws up a list of the different research programs which can be studied by getting a research reactor. First of all is the reactor behaviour and kinetics studies (reproducibility factor, exploration of neutron density, effect of reactor structure, effect of material irradiation...). Physical studies includes study of the behaviour of the control system, studies of neutron resonance phenomena and study of the fission process for example. Chemical studies involves the study of manipulation and control of hot material, characterisation of nuclear species produced in the reactor and chemical effects of irradiation on chemical properties and reactions. Biology and medicine research involves studies of irradiation on man and animals, genetics research, food or medical tools sterilization and neutron beams effect on tumour for example. A large number of other subjects can be studied in a reactor research as reactor construction material research, fabrication of radioactive sources for radiographic techniques or applied research as in agriculture or electronic. The second part discussed the technological considerations when choosing the reactor type. The technological factors, which are considered for its choice, are the power of the reactor, the nature of the fuel which is used, the type of moderator (water, heavy water, graphite or BeO) and the reflector, the type of coolants, the protection shield and the control systems. In the third part, it described the characteristics (place of installation, type of combustible and comments) and performance (power, neutron flux ) of already existing

  20. Research reactors; Les piles de recherche

    Energy Technology Data Exchange (ETDEWEB)

    Kowarski, L. [Commissariat a l' Energie Atomique, Paris (France). Centre d' Etudes Nucleaires]|[Organisation europeenne pour la Recherche Nucleaire, Geneve (Switzerland)

    1955-07-01

    It brings together the techniques data which are involved in the discussion about the utility for a research institute to acquire an atomic reactor for research purposes. This type of decision are often taken by non-specialist people who can need a brief presentation of a research reactor and its possibilities in term of research before asking advises to experts. In a first part, it draws up a list of the different research programs which can be studied by getting a research reactor. First of all is the reactor behaviour and kinetics studies (reproducibility factor, exploration of neutron density, effect of reactor structure, effect of material irradiation...). Physical studies includes study of the behaviour of the control system, studies of neutron resonance phenomena and study of the fission process for example. Chemical studies involves the study of manipulation and control of hot material, characterisation of nuclear species produced in the reactor and chemical effects of irradiation on chemical properties and reactions. Biology and medicine research involves studies of irradiation on man and animals, genetics research, food or medical tools sterilization and neutron beams effect on tumour for example. A large number of other subjects can be studied in a reactor research as reactor construction material research, fabrication of radioactive sources for radiographic techniques or applied research as in agriculture or electronic. The second part discussed the technological considerations when choosing the reactor type. The technological factors, which are considered for its choice, are the power of the reactor, the nature of the fuel which is used, the type of moderator (water, heavy water, graphite or BeO) and the reflector, the type of coolants, the protection shield and the control systems. In the third part, it described the characteristics (place of installation, type of combustible and comments) and performance (power, neutron flux ) of already existing

  1. Strategic planning for research reactors. Guidance for reactor managers

    International Nuclear Information System (INIS)

    2001-04-01

    The purpose of this publication is to provide guidance on how to develop a strategic plan for a research reactor. The IAEA is convinced of the need for research reactors to have strategic plans and is issuing a series of publications to help owners and operators in this regard. One of these covers the applications of research reactors. That report brings together all of the current uses of research reactors and enables a reactor owner or operator to evaluate which applications might be possible with a particular facility. An analysis of research reactor capabilities is an early phase in the strategic planning process. The current document provides the rationale for a strategic plan, outlines the methodology of developing such a plan and then gives a model that may be followed. While there are many purposes for research reactor strategic plans, this report emphasizes the use of strategic planning in order to increase utilization. A number of examples are given in order to clearly illustrate this function

  2. Work related to increasing the exploitation and experimental possibilities of the RA reactor, 05. Independent CO2 loop for cooling the samples irradiated in the RA vertical experimental channels (I-IV), Part II, IZ-240-0379-1963, Vol. II Head of the low temperature RA reactor coolant loop

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1963-07-01

    The objective of the project was to design the head of the CO 2 coolant loop for cooling the materials during irradiation in the RA reactor. Six heads of coolant loops will be placed in the RA reactor, two in the region of heavy water in the experimental channels VEK-6 and four in the graphite reflector in the channels VEK-G. maximum generated heat in the heads of the coolant loop is 10500 kcal/h and minimum generated heat is 1500 kcal/h. The loops are cooled by CO 2 gas, coolant flow is 420 kg/h, and the pressure is 4.5 atu. There is a need to design and construct the secondary coolant loop for the low temperature coolant loop. This volume includes technical specifications of the secondary CO 2 loop with instructions for construction and testing; needed calculations; specification of materials; cost estimation for materials, equipment and construction; and graphical documentation [sr

  3. Work related to increasing the exploitation and experimental possibilities of the RA reactor, 05. Independent CO2 loop for cooling the samples irradiated in the RA vertical experimental channels (IIV), Part I, IZ-240-o379-1963, Vol. I, Head of the low temperature RA reactor coolant loop

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1963-07-01

    The objective of the project was to design the head of the CO 2 coolant loop for cooling the materials during irradiation in the RA reactor. Six heads of coolant loops will be placed in the RA reactor, two in the region of heavy water in the experimental channels VEK-6 and four in the graphite reflector in the channels VEK-G. Materials for irradiation are metallurgy and chemical samples. In addition to the project objectives, this volume includes technical specifications of the coolant loop head, thermal calculations, calculations of mechanical stress, antireactivity and activation of the construction materials, cost estimation, scheme of the coolant loop head, diagrams of CO 2 gas temperature, thermal neutron flux distribution, design specifications of two proposed solutions for head of low temperature coolant loop [sr

  4. MAPLE research reactor beam-tube performance

    International Nuclear Information System (INIS)

    Lee, A.G.; Lidstone, R.F.; Gillespie, G.E.

    1989-05-01

    Atomic Energy of Canada Limited (AECL) has been developing the MAPLE (Multipurpose Applied Physics Lattice Experimental) reactor concept as a medium-flux neutron source to meet contemporary research reactor applications. This paper gives a brief description of the MAPLE reactor and presents some results of computer simulations used to analyze the neutronic performance. The computer simulations were performed to identify how the MAPLE reactor may be adapted to beam-tube applications such as neutron radiography

  5. The IAEA programme on research reactor safety

    International Nuclear Information System (INIS)

    Abou Yehia, H.

    2007-01-01

    According to the research reactor database of IAEA (RRDB), 250 reactors are operating worldwide, 248 have been shut down and 170 have been decommissioned. Among the 248 reactors that do not run, some will resume their activities, others will be dismantled and the rest do not face a clear future. The analysis of reported incidents shows that the ageing process is a major cause of failures, more than two thirds of operating reactors are over 30 years old. It also appears that the lack of adequate regulations or safety standards for research reactors is an important issue concerning reactor safety particularly when reactors are facing re-starting or upgrading or modifications. The IAEA has launched a 4-axis program: 1) to set basic safety regulations and standards for research reactors, 2) to provide IAEA members with an efficient help for the application of these safety regulations to their reactors, 3) to foster international exchange of information on research reactor safety, and 4) to provide IAEA members with a help concerning safety issues linked to malicious acts or sabotage on research reactors

  6. Safety of research reactors - A regulator's perspective

    International Nuclear Information System (INIS)

    Rahman, M.S.

    2001-01-01

    Due to historical reasons research reactors have received less regulatory attention in the world than nuclear power plants. This has given rise to several safety issues which, if not addressed immediately, may result in an undesirable situation. However, in Pakistan, research reactors and power reactors have received due attention from the regulatory authority. The Pakistan Research Reactor-1 has been under regulatory surveillance since 1965, the year of its commissioning. The second reactor has also undergone all the safety reviews and checks mandated by the licensing procedures. A brief description of the regulatory framework, the several safety reviews carried out have been briefly described in this paper. Significant activities of the regulatory authority have also been described in verifying the safety of research reactors in Pakistan along with the future activities. The views of the Pakistani regulatory authority on the specific issues identified by the IAEA have been presented along with specific recommendations to the IAEA. We are of the opinion that there are more Member States operating nuclear research reactors than nuclear power plants. Therefore, there should be more emphasis on the research reactor safety, which somehow has not been the case. In several recommendations made to the IAEA on the specific safety issues the emphasis has been, in general, to have a similar documentation and approach for maintaining and verifying operational safety at research reactors as is currently available for nuclear power reactors and may be planned for nuclear fuel cycle facilities. (author)

  7. The first university research reactor in India

    International Nuclear Information System (INIS)

    Murthy, G.S.

    1999-01-01

    At low power research reactor is being set up in Andhra University to cater to the needs of researchers and isotope users by the Department of Atomic Energy in collaboration with Andhra University. This reactor is expected to be commissioned by 2001-02. Departments like Chemistry, Earth Sciences, Physics, Life Sciences, Pharmacy, Medicine and Engineering would be the beneficiaries of the availability of this reactor. In this paper, details of the envisaged research programme and training activities are discussed. (author)

  8. Light water reactor safety research project

    International Nuclear Information System (INIS)

    Markoczy, G.; Aksan, S.N.; Behringer, K.; Prodan, M.; Stierli, F.; Ullrich, G.

    1980-07-01

    The research and development activities for the safety of Light Water Power Reactors carried out 1979 at the Swiss Federal Institute for Reactor Research are described. Considerations concerning the necessity, objectives and size of the Safety Research Project are presented, followed by a detailed discussion of the activities in the five tasks of the program, covering fracture mechanics and nondestructive testing, thermal-hydraulics, reactor noise analysis and pressure vessel steel surveillance. (Auth.)

  9. Operation and maintenance of the RA reactor in 1964, I-II, Part I

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1964-12-01

    During 1964, the Reactor as operated about 20 days each months at nominal power of 6.5 MW, 5 days at lower power levels and 5 days were used for maintenance. Total production was 27930 MWh which is 11.7% higher than the planned value. Fuel exchange was done 3 times during this period, 98 spent fuel channels were exchanged. In addition to routine maintenance of reactor components and instruments a series of analyses of heavy water and helium were done. Special attention was devoted to corrosion analyses of the reactor materials because of the heavy water system was refurbished decontaminated in 1963. Utilization of the experimental space in the reactor was better that previously. 546 samples were irradiated till the end of November, of which 443 for users from the Institute. Specific irradiations in the fast neutron flux were done in six VISA-2 channels in the core

  10. Operational report, Advantages of gradual introducing of highly enriched fuel into the RA reactor core from economic aspect and users needs; Radni izvestaj, Prednost postupka parcijalnog uvodjenja visokoobogacenog goriva u reaktor RA sa aspekta ekonomicnosti i potreba korisnika

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-10-14

    The possibility of increasing the neutron flux in the RA reactor was considered for a number of years. The possibilities of reactor reconstruction are not realistic and they should be disregarded. The possibility that remains is to achieve higher neutron flux by improving the fueling scheme and above all by introducing highly enriched fuel into the reactor core. Decision to purchase highly enriched fuel was quicker due to the fact that the 2% enriched uranium fuel is not fabricated any more. There are two procedures for exchanging the fuel in the reactor core: a) removal of partially spent 2% enriched fuel and formation of the core with fresh highly enriched fuel; b) gradually introducing the new fuel into the existing RA reactor core according to a special transfer regime. This report includes some comparative analyses of these two procedures from both economic point of view and the needs of users, as well as some technical conditions. These results are in favour of gradual introducing of new fuel into the reactor core. relevant direct savings amount to 3 000 000 dinars. Some of the most important advantages cannot be estimated in this way. This report does not cover the safety analyses results which are presented in a series of other papers. [Serbo-Croat] Vec vise godina razmatra se mogucnost za povecanje neutronskog fluksa u reaktoru RA. Mogucnosti za rekonstrukciju reaktora RA u tom smislu su minimalne i realno ih treba odbaciti. Prema tome preostaje da se povecanje neutronskog fluksa postigne usavrsavanjem seme izmene goriva, a pre svega uvodjenjem goriva sa visokim stepenom obogacenja u reaktor RA. Donosenje odluke o nabavci visokoobogacenog goriva i njegovom uvodjenju u reaktor ubrzano je i cinjenicom da se staro 2% obogaceno uransko gorivo vise ne proizvodi. Postoje dva postupka za prevodjenje reaktora na ovo gorivo: a) Uklanjanjem poluistrosenog 2% obogacenog goriva iz reaktora i formiranjem jezgra iskljucivo od svezeg visokoobogacenog goriva, b

  11. Investigation of the heavy water distillation system at the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.; Badrljica, R.

    1963-01-01

    The heavy water distillation system was tested because this was not done before the reactor start-up. Detailed inspection of the system components showed satisfactory results. Leak testing was done as well as the testing of the instrumentation which enables reliable performance of the system. Performance testing was done with ordinary water and later 2700 l of heavy water from the reactor was purified, decreasing the activity by 45%

  12. Measurement of the heavy water level in the fuel channels of the RA reactor - Annex 11

    International Nuclear Information System (INIS)

    Nikolic, M.

    1964-01-01

    The objective of measuring the heavy water level in the reactor channels was to verify experimentally the possibilities of reactor cooling with parallel operation of heavy water pumps od 1500 rotations/min at nominal power of 6.5 MW. Measurements were done in 2 periphery and 2 central fuel channels with pumps speed 1500, 1800 and 3000 rotations/min by a contact probe with electric resistance measuring device. precision of the measurement was ±1 cm

  13. The national standards program for research reactors

    International Nuclear Information System (INIS)

    Whittemore, W.L.

    1977-01-01

    In 1970 a standards committee called ANS-15 was established by the American Nuclear Society (ANS) to prepare appropriate standards for research reactors. In addition, ANS acts as Secretariat for a national standards committee N17 which is responsible to the American National Standards Institute (ANSI) for the national consensus efforts for standards related to research reactors. To date ANS-15 has completed or is working on 14 standards covering all aspects of the operation of research reactors. Of the 11 research reactor standards submitted to the ANSI N17 Committee since its inception, six have been issued as National standards, and the remaining are still in the process of review. (author)

  14. Planning the Decommissioning of Research Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Podlaha, J., E-mail: pod@ujv.cz [Nuclear Research Institute Rez, 25068 Rez (Czech Republic)

    2013-08-15

    In the Czech Republic, three research nuclear reactors are in operation. According to the valid legislation, preliminary decommissioning plans have been prepared for all research reactors in the Czech Republic. The decommissioning plans shall be updated at least every 5 years. Decommissioning funds have been established and financial resources are regularly deposited. Current situation in planning of decommissioning of research reactors in the Czech Republic, especially planning of decommissioning of the LVR-15 research reactor is described in this paper. There appeared new circumstances having wide impact on the decommissioning planning of the LVR-15 research reactor: (1) Shipment of spent fuel to the Russian Federation for reprocessing and (2) preparation of processing of radioactive waste from reconstruction of the VVR-S research reactor (now LVR-15 research reactor). The experience from spent fuel shipment to the Russian Federation and from the process of radiological characterization and processing of radioactive waste from reconstruction of the VVR-S research reactor (now the LVR-15 research reactor) and the impact on the decommissioning planning is described in this paper. (author)

  15. RB research reactor safety report

    International Nuclear Information System (INIS)

    Sotic, O.; Pesic, M.; Vranic, S.

    1979-04-01

    This new version of the safety report is a revision of the safety report written in 1962 when the RB reactor started operation after reconstruction. The new safety report was needed because reactor systems and components have been improved and the administrative procedures were changed. the most important improvements and changes were concerned with the use of highly enriched fuel (80% enriched), construction of reactor converter outside the reactor vessel, improved control system by two measuring start-up channels, construction of system for heavy water leak detection, new inter phone connection between control room and other reactor rooms. This report includes description of reactor building with installations, rector vessel, reactor core, heavy water system, control system, safety system, dosimetry and alarm systems, experimental channels, neutron converter, reactor operation. Safety aspects contain analyses of accident reasons, method for preventing reactivity insertions, analyses of maximum hypothetical accidents for cores with natural uranium, 2% enriched and 80% enriched fuel elements. Influence of seismic events on the reactor safety and well as coupling between reactor and the converter are parts of this document

  16. Application of JAERI research reactors to education

    International Nuclear Information System (INIS)

    Ogawa, Shigeru; Morozumi, Minoru

    1987-01-01

    At the dawning of the atomic age in Japan, training on reactor operation and reactor engineering experiments has been started in 1958 using JRR-1 (a 50 kW water boiler type reactor with liquid fuel), which was the first research reactor in Japan. The role of the training has been transferred to JRR-4 (a 3500 kW swimming pool type reactor with ETR type fuel) since 1969 due to the decommission of JRR-1. The training courses which have been held are: JRR-1 Short-Term Course for Operation (1958 ∼ 1963) General Course (1961 ∼ ) Reactor Engineering Course (1976 ∼ ) Training Course in Nuclear Technology (International course)(1986 ∼ ). And individual training concerning research reactors for the participants of scientist exchange program sponsored by Science and Technology Agency and of bilateral agreement have been initiated in 1985. The graduates of these courses work as staff members in various fields in nuclear industry. (author)

  17. United States Domestic Research Reactor Infrastructure TRIGA Reactor Fuel Support

    International Nuclear Information System (INIS)

    Morrell, Douglas

    2011-01-01

    The United State Domestic Research Reactor Infrastructure Program at the Idaho National Laboratory manages and provides project management, technical, quality engineering, quality inspection and nuclear material support for the United States Department of Energy sponsored University Reactor Fuels Program. This program provides fresh, unirradiated nuclear fuel to Domestic University Research Reactor Facilities and is responsible for the return of the DOE-owned, irradiated nuclear fuel over the life of the program. This presentation will introduce the program management team, the universities supported by the program, the status of the program and focus on the return process of irradiated nuclear fuel for long term storage at DOE managed receipt facilities. It will include lessons learned from research reactor facilities that have successfully shipped spent fuel elements to DOE receipt facilities.

  18. The Canadian research reactor spent fuel situation

    International Nuclear Information System (INIS)

    Ernst, P.C.

    1996-01-01

    This paper summarizes the present research reactor spent fuel situation in Canada. The research reactors currently operating are listed along with the types of fuel that they utilize. Other shut down research reactors contributing to the storage volume are included for completeness. The spent fuel storage facilities associated with these reactors and the methods used to determine criticality safety are described. Finally the current inventory of spent fuel and where it is stored is presented along with concerns for future storage. (author). 3 figs

  19. Usage of burnable poison on research reactors

    International Nuclear Information System (INIS)

    Villarino, Eduardo Anibal

    2002-01-01

    The fuel assemblies with burnable poison are widely used on power reactors, but there are not commonly used on research reactors. This paper shows a neutronic analysis of the advantages and disadvantages of the burnable poison usage on research reactors. This paper analyses both burnable poison design used on research reactors: Boron on the lateral wall and Cadmium wires. Both designs include a parametric study on the design parameters like the amount and geometry of the burnable poison. This paper presents the design flexibility using burnable poisons, it does not find an optimal or final design, which it will strongly depend on the core characteristics and fuel management strategy. (author)

  20. Reorganization of the radiologic protection of the nuclear reactor RA-0 for the next starting up at Cordoba National University

    International Nuclear Information System (INIS)

    Martin, H.R.; Chautemps, N.A.; Rumis, D.A.

    1991-01-01

    Due to the fulfillment to the tasks for the new starting up of the RA-0 Nuclear Reactor situated at the National University of Cordoba, it was necessary to plan and organize the service of Radiologic Protection to meet the future requirements in normal operation. The special characteristics that an installation of this type has in the university field, required special attention for making the university staff become aware in the working proceedings to follow up in normal conditions, such as the case of emergency that would originate in the installation. The training of the teaching and non teaching staff of the National University of Cordoba, the adjusting of the installations, the obtention of dosimetry and measurement equipment and the implementation of a monitor system of the staff were the main tasks confronted for the reorganization of the sector. (Author) [es

  1. Standards for safe operation of research reactors

    International Nuclear Information System (INIS)

    1996-01-01

    The safety of research reactors is based on many factors such as suitable choice of location, design and construction according to the international standards, it also depends on well trained and qualified operational staff. These standards determine the responsibilities of all who are concerned with the research reactors safe operation, and who are responsible of all related activities in all the administrative and technical stages in a way that insures the safe operation of the reactor

  2. Devices for irradiation of materials in the fast neutron flux at the RA heavy water reactor in Vinca; Uredjaji za ozracivanje materijala u fluksu brzih neutrona na teskovodnom reaktoru RA u Vinci

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institut za nuklearne nauke Boris Kidric, Vinca, Beograd (Yugoslavia)

    1964-07-01

    Full text: This paper covers the concept, technical description and problems of constructing special experimental facilities at the RA reactor in Vinca. During 1962, construction materials (graphite, Mg, Al-oxides, steel and Zircaloy) were irradiated in these facilities at temperatures below 100 deg C by the integral fast neutron flux of 2 10{sup 20} n/cm{sup 2}. Temperature of the samples cooled by heavy water circulating through hollow uranium elements was measured by thermocouples. Construction of the facility, sample preparation, related measurements of the flux and irradiation of the samples were done in cooperation with the Nuclear center in Saclay, France. A short review of the experiences in using the new experimental space at the RA reactor is given, together with some problems related to transport of radioactive capsules containing samples from Vinca to Saclay.

  3. Activities of the Service for maintenance of the RA reactor electronic equipment in 1979 - Report - Annex IV; Prilog IV Rad sluzbe za odrzavanje elektronske opreme reaktora RA u 1979. godini - Izvestaj -

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1979-12-15

    Within the organizational structure of the RA reactor staff, the Service for instrumentation maintenance has the following tasks: maintenance of the existing electronic equipment; participating in experiments planning and preparation of electronic equipment; purchasing new equipment, spare parts and components; construction of new equipment for internal needs; implementation of new equipment. Basic instrumentation of the reactor facility includes: control and protection system, and dosimetry system. [Serbo-Croat] U okviru organizacione seme OOUR nuklearni reaktor RA sluzba za odrzavanje instrumentacije postrojenja ima sledece zadatke: odrzavanje postojece elektronske opreme; ucesce u planiranju eksperimenata i priprema elektronske opreme; nabavka nove opreme, rezervnih delova i komponenti; rad na izradi elektronske opreme i uredjaja za sopstvene potrebe i izrada projekata u domenu reaktorske opreme i ucesce u ugradnji nove opreme. Osnovna instrumentacija postrojenja obuhvata: sistem za upravljanje i zastitu, sistem za tehnolosku kontrolu i sistem za dozimetrijsku kontrolu.

  4. Analysis of accident caused by temperature increase at the RA reactor in Vinca

    International Nuclear Information System (INIS)

    Afgan, N; Kulundzic, P.

    1964-06-01

    The objective of this work was to determine the maximum time interval without accident due to mechanical failures. The following accidents caused by mechanical failures are taken into account: loss of moderator flow, moderator leaking with or without circulation, and accidents caused by removal of fuel channels from the reactor vessel. Obtained numerical and experimental results are presented. Experimental device installed at the reactor was used for verification of calculation results. The analysis was done for the most damaging conditions and thus the obtained results represent the lowest boundary values [sr

  5. Physics and safety of advanced research reactors

    International Nuclear Information System (INIS)

    Boening, K.; Hardt, P. von der

    1987-01-01

    Advanced research reactor concepts are presently being developed in order to meet the neutron-based research needs of the nineties. Among these research reactors, which are characterized by an average power density of 1-10 MW per liter, highest priority is now generally given to the 'beam tube reactors'. These provide very high values of the thermal neutron flux (10 14 -10 16 cm -2 s -1 ) in a large volume outside of the reactor core, which can be used for sample irradiations and, in particular, for neutron scattering experiments. The paper first discusses the 'inverse flux trap concept' and the main physical aspects of the design and optimization of beam tube reactors. After that two examples of advanced research reactor projects are described which may be considered as two opposite extremes with respect to the physical optimization principle just mentioned. The present situation concerning cross section libraries and neutronic computer codes is more or less satisfactory. The safety analyses of advanced research reactors can largely be updated from those of current new designs, partially taking advantage of the immense volume of work done for power reactors. The paper indicates a few areas where generic problems for advanced research reactor safety are to be solved. (orig.)

  6. IAEA programme on research reactor safety

    International Nuclear Information System (INIS)

    Alcala, F.; Di Meglio, A.F.

    1995-01-01

    This paper describes the IAEA programme on research reactor safety and includes the safety related areas of conversions to the use of low enriched uranium (LEU) fuel. The program is based on the IAEA statutory responsibilities as they apply to the requirements of over 320 research reactors operating around the world. The programme covers four major areas: (a) the development of safety documents; (b) safety missions to research reactor facilities; (c) support of research programmes on research reactor safety; (d) support of Technical Cooperation projects on research reactor safety issues. The demand for these activities by the IAEA member states has increased substantially in recent years especially in developing countries with increasing emphasis being placed on LEU conversion matters. In response to this demand, the IAEA has undertaken an extensive programme for each of the four areas above. (author)

  7. Nuclear reactor safety research in Idaho

    International Nuclear Information System (INIS)

    Zeile, H.J.

    1983-01-01

    Detailed information about the performance of nuclear reactor systems, and especially about the nuclear fuel, is vital in determining the consequences of a reactor accident. Fission products released from the fuel during accidents are the ultimate safety concern to the general public living in the vicinity of a nuclear reactor plant. Safety research conducted at the Idaho National Engineering Laboratory (INEL) in support of the U.S. Nuclear Regulatory Commission (NRC) has provided the NRC with detailed data relating to most of the postulated nuclear reactor accidents. Engineers and scientists at the INEL are now in the process of gathering data related to the most severe nuclear reactor accident - the core melt accident. This paper describes the focus of the nuclear reactor safety research at the INEL. The key results expected from the severe core damage safety research program are discussed

  8. Overview of the Dalat Nuclear Research Reactor

    International Nuclear Information System (INIS)

    Nguyen Nhi Dien; Nguyen Thai Sinh; Luong Ba Vien

    2016-01-01

    The present reactor called Dalat Nuclear Research Reactor (DNRR) has been reconstructed from the former TRIGA Mark II reactor which was designed by General Atomic (GA, San Diego, California, USA), started building in early 1960s, put into operation in 1963 and operated until 1968 at nominal power of 250 kW. In 1975, all fuel elements of the reactor were unloaded and shipped back to the USA. The DNRR is a 500-kW pool-type research reactor using light water as both moderator and coolant. The reactor is used as a neutron source for the purposes of: (1) radioactive isotope production; (2) neutron activation analysis; and (3) research and training

  9. Annex 7 - Task 08/32 final report, Diffusion bond between the fuel and cladding of the RA reactor fuel element; Prilog 7 - Zavrsni izvestaj o podzadatku 08/32, Difuziona veza goriva i kosuljice gorivnog elementa reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Kustudic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    Based on testing the diffusin bond between the fuel and the aluminium cladding of the RA reactor fuel element it was found that the diffusion bond exists; uranium is protected by a nickel layer to prevent the damaging diffusion between uranium and aluminium; the nickel layer is about 5 microns thick. Under assumption that the diffusion annealing was done after cladding the annealing temperature was about 500 deg C for about 1 hour.

  10. New experimental space for irradiating samples by RA reactor fast neutron flux at temperatures up to 100 deg C; Novi eksperimentalni prostori namenjeni ozracivanju uzoraka u fluksu brzih neutrona na temperaturama do 100{sup 0} C na reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M; Novakovic, M; Zecevic, V [Boris Kidric Institute of nuclear sciences, Vinca, Belgrade (Yugoslavia)

    1961-07-01

    The objective of this paper is to present adaptation of the RA reactor which would enable samples irradiation by fast neutrons and describe new experimental possibilities. New experimental space was achieved using hollow fuel elements which have been reconstructed to enable placement of irradiation capsules inside the tube. This paper includes thermal analysis and describes problems related to operation, safety and radiation protection issues which arise from using reconstructed fuel elements.

  11. Management of operational events in research reactor

    International Nuclear Information System (INIS)

    Zhong Heping; Yang Shuchun; Peng Xueming

    2001-01-01

    The author describes the tracing management process post-operational event in a research reactor based on nuclear safety code, under the background of the research reactor in Nuclear Power Institute of China. It presorts the definite measures to the event tracing and it up its management factors

  12. RA Reactor operation and maintenance (I-IX), Part II, Task 3.08/04; Pogon i odrzavanje reaktora RA (I-IX), II Deo, Zadatak 3.08/04

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    Repair and maintenance work of the RA reactor components and equipment was longer than planned due to the following reasons: chemical decontamination of the reactor heavy water system indispensable for maintenance of the heavy water pumps; findings of contamination origin changed the maintenance schedule; some construction materials of the heavy water pumps which caused contamination had to be removed; a number of the planned operations had to be performed under increase level of gamma radiation which increased the time needed for repair. This report covers detailed description of all the maintenance and repair work done from 25 Jan to 22 Apr 1963.

  13. Experimental operation of the RA reactor with 4 fuel channels containing 80% enriched dispersion fuel - Operational Report; Radni izvestaj - Eksperimentalna kampanja reaktora RA sa 4 kanala sa 80% obogacenim disperzionim gorivom

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Milosevic, M; Cupac, S; Kozomara, S [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-12-15

    Start of utilization of the new 80% enriched dispersion nuclear fuel is underway in the RA reactor core. Both economic and technical analyses were in favor of introducing the new fuel elements gradually into the RA reactor core. Thus overall theoretical and experimental analyses as well as other preparations are directed to transition regime based on gradual introducing of new fuel into the core, i.e. reactor core with two types of fuel. The objective of these analyses and preparation is establishment of conditions for safe reactor operation during transition period. The analyses and preparations are almost completed. The experimental data about fuel burnup during a time period of operation at nominal power i.e. daily decrease of excess reactivity is missing. This data is needed for planning the refueling (quantity of fresh fuel and frequency of refueling) during the transient period. This data can be obtained only by normal operation of the reactor during a period of time significantly longer than the period of attaining equilibrium poisoning, as time between two D{sub 2}O condensate overflows into the RA reactor core. Thus a ten day experimental campaign was planned to be done in December 1976. This report presents the most important results of safety analyses and preparation which show that, during this experimental period, the reactor operation is absolutely safe taking into account the most important parameters influencing reactor safety, as reactivity, thermal and temperature limits for fuel and the reactor, etc. Data to be obtained during this experimental campaign are significant because they would enable definition of future supply of fresh fuel during the transition period. [Serbo-Croat] Predstoji pocetak koriscenja novog 80% obogacenog uranskog disperzionog goriva u reaktoru RA. Ekonomske i tehnicke analize dale su prednost postupku postepenog uvodjenja novog goriva u reaktor RA. Prema tome, obimne teorijske i eksperimentalne analize i druge pripreme

  14. RA-3 reactor core with uranium silicide fuel elements P-07 type

    International Nuclear Information System (INIS)

    Abbate, Maximo J.; Sbaffoni, Maria M.

    2003-01-01

    Following the studies on the utilization of fuel elements (FE) containing uranium silicide, core of the RA-3 was analyzed with several calculation models. At first, the present situation, i.e. the core charged with normal FE (U 3 O 8 ), has been analyzed to validate the simulation methodology comparing with experimental results and to establish reference data to 5 and 10 MW able to be compared with future new situations. Also, CITVAP's nuclear data libraries to be used in irradiation experiment planning were completed. The results were satisfactory and were applied to the study of the core containing P-07 FE [U 3 Si 2 ], in face of a future core change. Comparing with the performance of the U 3 O 8 FE, the silicides ones show the following advantages: - average burnup: 45 % greater; -extraction burnup increase 12 %; and, -the residence time [in full power days] could be a 117 % greater. (author)

  15. Design of a multipurpose research reactor

    International Nuclear Information System (INIS)

    Sanchez Rios, A.A.

    1990-01-01

    The availability of a research reactor is essential in any endeavor to improve the execution of a nuclear programme, since it is a very versatile tool which can make a decisive contribution to a country's scientific and technological development. Because of their design, however, many existing research reactors are poorly adapted to certain uses. In some nuclear research centres, especially in the advanced countries, changes have been made in the original designs or new research prototypes have been designed for specific purposes. These modifications have proven very costly and therefore beyond the reach of developing countries. For this reason, what the research institutes in such countries need is a single sufficiently versatile nuclear plant capable of meeting the requirements of a nuclear research programme at a reasonable cost. This is precisely what a multipurpose reactor does. The Mexican National Nuclear Research Institute (ININ) plans to design and build a multipurpose research reactor capable at the same time of being used for the development of reactor design skills and for testing nuclear materials and fuels, for radioisotopes production, for nuclear power studies and basic scientific research, for specialized training, and so on. For this design work on the ININ Multipurpose Research Reactor, collaborative relations have been established with various international organizations possessing experience in nuclear reactor design: Atomehnergoeksport of the USSR: Atomic Energy of Canada Limited (AECL); General Atomics (GA) of the USA; and Japan Atomic Energy Research Institute

  16. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Yoder, John; Bessler, Nancy J.

    1988-01-01

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  17. Nuclear data usage for research reactors

    International Nuclear Information System (INIS)

    Nakano, Yoshihiro; Soyama, Kazuhiko; Amano, Toshio

    1996-01-01

    In the department of research reactor, many neutronics calculations have been performed to construct, to operate and to modify research reactors of JAERI with several kinds of nuclear data libraries. This paper presents latest two neutronic analyses on research reactors. First one is design work of a low enriched uranium (LEU) fuel for JRR-4 (Japan Research Reactor No.4). The other is design of a uranium silicon dispersion type (silicide) fuel of JRR-3M (Japan Research Reactor No.3 Modified). Before starting the design work, to estimate the accuracy of computer code and calculation method, experimental data are calculated with several nuclear data libraries. From both cases of calculations, it is confirmed that JENDL-3.2 gives about 1 %Δk/k higher excess reactivity than JENDL-3.1. (author)

  18. IAEA activities on research reactor safety

    International Nuclear Information System (INIS)

    Alcala-Ruiz, F.

    1995-01-01

    Since its inception in 1957, the International Atomic Energy Agency (IAEA) has included activities in its programme to address aspects of research reactors such as safety, utilization and fuel cycle considerations. These activities were based on statutory functions and responsibilities, and on the current situation of research reactors in operation around the world; they responded to IAEA Member States' general or specific demands. At present, the IAEA activities on research reactors cover the above aspects and respond to specific and current issues, amongst which safety-related are of major concern to Member States. The present IAEA Research Reactor Safety Programme (RRSP) is a response to the current situation of about 300 research reactors in operation in 59 countries around the world. (orig.)

  19. Developments in the regulation of research reactors

    International Nuclear Information System (INIS)

    Loy, J.

    2003-01-01

    The International Atomic Energy Agency (IAEA) has data on over 670 research reactors in the world. Fewer than half of them are operational and a significant number are in a shutdown but not decommissioned state. The International Nuclear Safety Advisory Group (INSAG) has expressed concerns about the safety of many research reactors and this has resulted in a process to draw up an international Code of Conduct on the Safety of Research Reactors. The IAEA is also reviewing its safety standards applying to research reactors. On the home front, regulation of the construction of the Replacement Research Reactor continues. During the construction phase, regulation has centred around the consideration of Requests for Approval (RFA) for the manufacture and installation of systems, structures and components important for safety. Quality control of construction of systems, structures and components is the central issue. The process for regulation of commissioning is under consideration

  20. Software development for research reactors

    International Nuclear Information System (INIS)

    Krohn, J.L.; Feltz, D.E.; Khalil, N.S.

    1986-01-01

    The Texas A and M University Nuclear Science Center, in a program jointly sponsored with the International Atomic Energy Agency, is developing a series of computer software programs of use at research reactor facilities. The programs cover a wide range of topics including activation and shielding calculations, control rod calibrations, power calorimetrics, and fuel inventory including burnup. Many of the programs are modified and improved versions of programs already in use at the NSC that ran on outdated computing equipment. All of the new versions were written in Fortran77 on the NSC's new TI Pro microcomputer and are IBM-compatible. This paper describes the development and translation efforts in preparing the programs for use by other facilities, and gives an overview of the aim of the development effort. A brief description of each program that has been or is to be written is given including the required inputs and the resulting outputs. This paper also addresses the original needs that brought about the development program and the benefits to facility operations that each program provides. The programs discussed are available to interested parties in a hard-copy listing as requested. (author)

  1. The future role of research reactors

    International Nuclear Information System (INIS)

    Glaeser, W.

    2001-01-01

    The decline of neutron source capacity in the next decades urges for the planning and construction of new neutron sources for basic and applied research with neutrons. Modern safety precautions of research reactors make them competitive with other ways of neutron production using non-chain reactions for many applications. Research reactors consequently optimized offer a very broad range of possible applications in basic and applied research. Research reactors at universities also in the future have to play an important role in education and training in basic and applied nuclear science. (orig.)

  2. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  3. Simulation of a pool type research reactor

    International Nuclear Information System (INIS)

    Oliveira, Andre Felipe da Silva de; Moreira, Maria de Lourdes

    2011-01-01

    Computational fluid dynamic is used to simulate natural circulation condition after a research reactor shutdown. A benchmark problem was used to test the viability of usage such code to simulate the reactor model. A model which contains the core, the pool, the reflector tank, the circulation pipes and chimney was simulated. The reactor core contained in the full scale model was represented by a porous media. The parameters of porous media were obtained from a separate CFD analysis of the full core model. Results demonstrate that such studies can be carried out for research and test of reactors design. (author)

  4. Advanced research reactor fuel development

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chang Kyu; Pak, H. D.; Kim, K. H. [and others

    2000-05-01

    The fabrication technology of the U{sub 3}Si fuel dispersed in aluminum for the localization of HANARO driver fuel has been launches. The increase of production yield of LEU metal, the establishment of measurement method of homogeneity, and electron beam welding process were performed. Irradiation test under normal operation condition, had been carried out and any clues of the fuel assembly breakdown was not detected. The 2nd test fuel assembly has been irradiated at HANARO reactor since 17th June 1999. The quality assurance system has been re-established and the eddy current test technique has been developed. The irradiation test for U{sub 3}Si{sub 2} dispersed fuels at HANARO reactor has been carried out in order to compare the in-pile performance of between the two types of U{sub 3}Si{sub 2} fuels, prepared by both the atomization and comminution processes. KAERI has also conducted all safety-related works such as the design and the fabrication of irradiation rig, the analysis of irradiation behavior, thermal hydraulic characteristics, stress analysis for irradiation rig, and thermal analysis fuel plate, for the mini-plate prepared by international research cooperation being irradiated safely at HANARO. Pressure drop test, vibration test and endurance test were performed. The characterization on powders of U-(5.4 {approx} 10 wt%) Mo alloy depending on Mo content prepared by rotating disk centrifugal atomization process was carried out in order to investigate the phase stability of the atomized U-Mo alloy system. The {gamma}-U phase stability and the thermal compatibility of atomized U-16at.%Mo and U-14at.%Mo-2at.%X(: Ru, Os) dispersion fuel meats at an elevated temperature have been investigated. The volume increases of U-Mo compatibility specimens were almost the same as or smaller than those of U{sub 3}Si{sub 2}. However the atomized alloy fuel exhibited a better irradiation performance than the comminuted alloy. The RERTR-3 irradiation test of nano

  5. Reactor operations Brookhaven medical research reactor, Brookhaven high flux beam reactor informal monthly report

    International Nuclear Information System (INIS)

    Hauptman, H.M.; Petro, J.N.; Jacobi, O.

    1995-04-01

    This document is the April 1995 summary report on reactor operations at the Brookhaven Medical Research Reactor and the Brookhaven High Flux Beam Reactor. Ongoing experiments/irradiations in each are listed, and other significant operations functions are also noted. The HFBR surveillance testing schedule is also listed

  6. Research reactor standards and their impact on the TRIGA reactor community

    International Nuclear Information System (INIS)

    Richards, W.J.

    1980-01-01

    The American Nuclear Society has established a standards committee devoted to writing standards for research reactors. This committee was formed in 1971 and has since that time written over 15 standards that cover all aspects of research reactor operation. The committee has representation from virtually every group concerned with research reactors and their operation. This organization includes University reactors, National laboratory reactors, Nuclear Regulatory commission, Department of Energy and private nuclear companies and insurers. Since its beginning the committee has developed standards in the following areas: Standard for the development of technical specifications for research reactors; Quality control for plate-type uranium-aluminium fuel elements; Records and reports for research reactors; Selection and training of personnel for research reactors; Review of experiments for research reactors; Research reactor site evaluation; Quality assurance program requirements for research reactors; Decommissioning of research reactors; Radiological control at research reactor facilities; Design objectives for and monitoring of systems controlling research reactor effluents; Physical security for research reactor facilities; Criteria for the reactor safety systems of research reactors; Emergency planning for research reactors; Fire protection program requirements for research reactors; Standard for administrative controls for research reactors. Besides writing the above standards, the committee is very active in using communications with the nuclear regulatory commission on proposed rules or positions which will affect the research reactor community

  7. Manual for the operation of research reactors

    International Nuclear Information System (INIS)

    1965-01-01

    The great majority of the research reactors in newly established centres are light-water cooled and are often also light-water moderated. Consequently, the IAEA has decided to publish in its Technical Reports Series a manual dealing with the technical and practical problems associated with the safe and efficient operation of this type of reactor. Even though this manual is limited to light-water reactors in its direct application and presents the practices and experience at one specific reactor centre, it may also be useful for other reactor types because of the general relevance of the problems discussed and the long experience upon which it is based. It has, naturally, no regulatory character but it is hoped that it will be found helpful by staff occupied in all phases of the practical operation of research reactors, and also by those responsible for planning their experimental use. 23 refs, tabs

  8. Temperature measurement of the reactor materials samples irradiated in the fuel channels of the RA reactor - Annex 16

    International Nuclear Information System (INIS)

    Nikolic, M.; Djalovic, M.

    1964-01-01

    Reactor materials as graphite, stainless steel, magnox, zirconium alloys, etc. were exposed to fast neutron flux inside the fuel elements specially adapted for this purpose. Samples in the form ampoules were placed in capsules inside the fuel channels and cooled by heavy water which cools the fuel elements. In order to monitor the samples temperature 42 thermocouples were placed in the samples. That was necessary for reactor safety reasons and for further interpretation of measured results. Temperature monitoring was done continuously by multichannel milivoltmeters. This paper describes the technique of introducing the thermocouples, compensation instruments, control of the cold ends and adaptation of the instruments for precision (0.5%) temperature measurement in the range 30 deg - 130 deg C; 30 deg - 280 deg C and 30 deg - 80 deg C [sr

  9. dynamic performance of research reactors

    International Nuclear Information System (INIS)

    Abo elnor, A.G.M.

    2007-01-01

    this work studies the dynamic performance of material testing reactor (MTR), where the dynamic performance of any reactor reflects its safety behavior and it should enhance its intrinsic characteristics s ystem corrects itself internally without introducing external corrective action . the present work analyzes and studies the dynamic performance of mtr through the transfer function. the servo system parameters can be changed to fit the system demand. the servo system is an excellent approximation to some of the practical servo system currently use in reactor control system, and a quadratic form of this sort should closely approximate the behavior of almost any type of physical equipment which might be chosen to drive a control rod. proposed changes in servo system parameters could enhance the dynamic performance of the system , but the suitable parameters can be evaluated by using the automatic reactor power control system model

  10. Radiation protection at the RA Reactor in 1985, Part -2, Annex 1, Radioactivity control of working environment, dosimetry

    International Nuclear Information System (INIS)

    Ninkovic, M.; Bjelanovic, J.; Minincic, Z.; Komatina, R.; Raicevic, J.

    1985-01-01

    This report contains data and analysis of the of measured sample results collected during radiation protection control in the working environment of the RA reactor. First part contains basic exposure values and statistical review of the the total number of radiation measurements. It includes contents of radioactive gasses and effluents in the air, as well as the level of surface contamination of clothes and uncovered parts of the personnel bodies. Second part deals with the analysis of personnel doses. It was found that the maximum individual dose from external irradiation amounted to 8.2 mSV during past 10 months. Individual exposures for 7/10 of the personnel were less than 1/10 of the annual permissible exposure. Data are compared to radiation doses for last year and previous five years. Third part of this annex contains basic data about the quantity of collected radioactive waste, total quantity of contaminated and decontaminated surfaces. The last part analyzes accidents occurred at the reactor during 1985. It was found that there have been no accidents that could cause significant contamination of working surfaces and components nor radiation exposure of the personnel [sr

  11. Education and Training on ISIS Research Reactor

    International Nuclear Information System (INIS)

    Foulon, F.; Badeau, G.; Lescop, B.; Wohleber, X.

    2013-01-01

    In the frame of academic and vocational programs the National Institute for Nuclear Science and Technology uses the ISIS research reactor as a major tool to ensure a practical and comprehensive understanding of the nuclear reactor physics, principles and operation. A large set of training courses have been developed on ISIS, optimising both the content of the courses and the pedagogical approach. Programs with duration ranging from 3 hours (introduction to reactor operation) to 24 hours (full program for the future operators of research reactors) are carried out on ISIS reactor. The reactor is operated about 350 hours/year for education and training, about 40 % of the courses being carried out in English. Thus, every year about 400 trainees attend training courses on ISIS reactor. We present here the ISIS research reactor and the practical courses that have been developed on ISIS reactor. Emphasis is given to the pedagogical method which is used to focus on the operational and safety aspects, both in normal and incidental operation. We will present the curricula of the academic and vocational courses in which the practical courses are integrated, the courses being targeted to a wide public, including operators of research reactors, engineers involved in the design and operation of nuclear reactors as well as staff of the regulatory body. We address the very positive impact of the courses on the development of the competences and skills of participants. Finally, we describe the Internet Reactor Laboratories (IRL) that are under development and will consist in broadcasting the training courses via internet to remote facilities or institutions

  12. Education and Training on ISIS Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Foulon, F.; Badeau, G.; Lescop, B.; Wohleber, X. [French Atomic Energy and Alternative Energies Commission, Paris (France)

    2013-07-01

    In the frame of academic and vocational programs the National Institute for Nuclear Science and Technology uses the ISIS research reactor as a major tool to ensure a practical and comprehensive understanding of the nuclear reactor physics, principles and operation. A large set of training courses have been developed on ISIS, optimising both the content of the courses and the pedagogical approach. Programs with duration ranging from 3 hours (introduction to reactor operation) to 24 hours (full program for the future operators of research reactors) are carried out on ISIS reactor. The reactor is operated about 350 hours/year for education and training, about 40 % of the courses being carried out in English. Thus, every year about 400 trainees attend training courses on ISIS reactor. We present here the ISIS research reactor and the practical courses that have been developed on ISIS reactor. Emphasis is given to the pedagogical method which is used to focus on the operational and safety aspects, both in normal and incidental operation. We will present the curricula of the academic and vocational courses in which the practical courses are integrated, the courses being targeted to a wide public, including operators of research reactors, engineers involved in the design and operation of nuclear reactors as well as staff of the regulatory body. We address the very positive impact of the courses on the development of the competences and skills of participants. Finally, we describe the Internet Reactor Laboratories (IRL) that are under development and will consist in broadcasting the training courses via internet to remote facilities or institutions.

  13. Research reactor records in the INIS database

    International Nuclear Information System (INIS)

    Marinkovic, N.

    2001-01-01

    This report presents a statistical analysis of more than 13,000 records of publications concerned with research and technology in the field of research and experimental reactors which are included in the INIS Bibliographic Database for the period from 1970 to 2001. The main objectives of this bibliometric study were: to make an inventory of research reactor related records in the INIS Database; to provide statistics and scientific indicators for the INIS users, namely science managers, researchers, engineers, operators, scientific editors and publishers, decision-makers in the field of research reactors related subjects; to extract other useful information from the INIS Bibliographic Database about articles published in research reactors research and technology. (author)

  14. Reactor protection systems for the Replacement Research Reactor, ANSTO

    International Nuclear Information System (INIS)

    Morris, C.R.

    2003-01-01

    The 20-MW Replacement Research Reactor Project which is currently under construction at ANSTO will have a combination of a state of the art triplicated computer based reactor protection system, and a fully independent, and diverse, triplicated analogue reactor protection system, that has been in use in the nuclear industry, for many decades. The First Reactor Protection System (FRPS) consists of a Triconex triplicated modular redundant system that has recently been approved by the USNRC for use in the USA?s power reactor program. The Second Reactor Protection System is a hardwired analogue system supplied by Foxboro, the Spec 200 system, which is also Class1E qualified. The FRPS is used to drop the control rods when its safety parameter setpoints have been reached. The SRPS is used to drain the reflector tank and since this operation would result in a reactor poison out due to the time it would take to refill the tank the FRPS trip setpoints are more limiting. The FRPS and SRPS have limited hardwired indications on the control panels in the main control room (MCR) and emergency control centre (ECC), however all FRPS and SRPS parameters are capable of being displayed on the reactor control and monitoring system (RCMS) video display units. The RCMS is a Foxboro Series I/A control system which is used for plant control and monitoring and as a protection system for the cold neutron source. This paper will provide technical information on both systems, their trip logics, their interconnections with each other, and their integration into the reactor control and monitoring system and control panels. (author)

  15. A top priority problem of national radiation protection - proper disposal of research reactor spent fuel

    International Nuclear Information System (INIS)

    Marinkovic, N.; Matausek, M.V.; Jovic, V.

    1997-01-01

    The paper presents basic facts about RA research reactor at the Vinca Institute. The present state of the RA reactor spent fuel storage pool appears to be a serious safety and radiological problem, which must be solved urgently, independent of the decision about the future status of the reactor itself. The following paragraphs describe current activities on improving storage conditions of the research reactor RA spent fuel. Activities performed so far, concerning identification and improvement of the spent fuel storage conditions are presented. These are verification of radiation protection measures, radiological and chemical analyses, visual inspection and photographing, safety analyses and nuclear criticality studies.A project for long-term solution of the research reactor spent fuel storage is proposed. In order to minimise further corrosion and establish strict control of all the relevant technological parameters of the utility, improvement of conditions for disposal of the fuel in the existing storage, is foreseen in the first phase. New dry storage for long-term storing of the spent fuel should be built during the second phase of the project. Particular attention is paid to the activities related to radiation protection and waste treatment, starting from standard monitoring and control, radiological analyses, regulations and legislation, to complicated handling of high level radioactive waste. (authors)

  16. Independent CO{sub 2} loop for cooling the samples irradiated in the RA reactor vertical experimental channels, Task 2.50.05; Nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u vertikalnim eksperimentalnim kanalima reaktora RA, Zad. 2.50.05

    Energy Technology Data Exchange (ETDEWEB)

    Stojic, M; Pavicevic, M

    1964-07-01

    This report contains the following volumes V and VI of the Project 'Independent CO{sub 2} loop for cooling the samples irradiated in RA reactor vertical experimental channels': Design project of the dosimetry control system in the independent CO{sub 2} loop for cooling the samples irradiated in the RA reactor vertical experimental channels, and Safety report for the Independent CO{sub 2} loop for cooling the samples irradiated in the RA reactor vertical experimental channels. Ovaj izvestaj sadrzi dva albuma zadatka 'Nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u vertikalnim eksperimentalnim kanalima reaktora RA', Zad. 2.50.05: Album V: Predprojekat sistema dozimetrijske kontrole u nezavisnom kolu CO{sub 2} za hladjenje uzoraka ozracivanih u VEK reaktora RA i Album VI: Izvestaj o sigurnosti za nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u VEK reaktora RA.

  17. New research possibilities at the Budapest research reactor

    International Nuclear Information System (INIS)

    Hargitai, T.; Vidovszky, I.

    2001-01-01

    The Budapest Research Reactor is the first nuclear facility of Hungary. It was commissioned in 1959, reconstructed and upgraded in 1967 and 1986-92. The main purpose of the reactor is to serve neutron research. The reactor was extended by a liquid hydrogen type cold neutron source in 2000. The research possibilities are much improved by the CNS both in neutron scattering and neutron activation. (author)

  18. Impact of proposed research reactor standards on reactor operation

    Energy Technology Data Exchange (ETDEWEB)

    Ringle, J C; Johnson, A G; Anderson, T V [Oregon State University (United States)

    1974-07-01

    A Standards Committee on Operation of Research Reactors, (ANS-15), sponsored by the American Nuclear Society, was organized in June 1971. Its purpose is to develop, prepare, and maintain standards for the design, construction, operation, maintenance, and decommissioning of nuclear reactors intended for research and training. Of the 15 original members, six were directly associated with operating TRIGA facilities. This committee developed a standard for the Development of Technical Specifications for Research Reactors (ANS-15.1), the revised draft of which was submitted to ANSI for review in May of 1973. The Committee then identified 10 other critical areas for standards development. Nine of these, along with ANS-15.1, are of direct interest to TRIGA owners and operators. The Committee was divided into subcommittees to work on these areas. These nine areas involve proposed standards for research reactors concerning: 1. Records and Reports (ANS-15.3) 2. Selection and Training of Personnel (ANS-15.4) 3. Effluent Monitoring (ANS-15.5) 4. Review of Experiments (ANS-15.6) 5. Siting (ANS-15.7) 6. Quality Assurance Program Guidance and Requirements (ANS-15.8) 7. Restrictions on Radioactive Effluents (ANS-15.9) 8. Decommissioning (ANS-15.10) 9. Radiological Control and Safety (ANS-15.11). The present status of each of these standards will be presented, along with their potential impact on TRIGA reactor operation. (author)

  19. Impact of proposed research reactor standards on reactor operation

    International Nuclear Information System (INIS)

    Ringle, J.C.; Johnson, A.G.; Anderson, T.V.

    1974-01-01

    A Standards Committee on Operation of Research Reactors, (ANS-15), sponsored by the American Nuclear Society, was organized in June 1971. Its purpose is to develop, prepare, and maintain standards for the design, construction, operation, maintenance, and decommissioning of nuclear reactors intended for research and training. Of the 15 original members, six were directly associated with operating TRIGA facilities. This committee developed a standard for the Development of Technical Specifications for Research Reactors (ANS-15.1), the revised draft of which was submitted to ANSI for review in May of 1973. The Committee then identified 10 other critical areas for standards development. Nine of these, along with ANS-15.1, are of direct interest to TRIGA owners and operators. The Committee was divided into subcommittees to work on these areas. These nine areas involve proposed standards for research reactors concerning: 1. Records and Reports (ANS-15.3) 2. Selection and Training of Personnel (ANS-15.4) 3. Effluent Monitoring (ANS-15.5) 4. Review of Experiments (ANS-15.6) 5. Siting (ANS-15.7) 6. Quality Assurance Program Guidance and Requirements (ANS-15.8) 7. Restrictions on Radioactive Effluents (ANS-15.9) 8. Decommissioning (ANS-15.10) 9. Radiological Control and Safety (ANS-15.11). The present status of each of these standards will be presented, along with their potential impact on TRIGA reactor operation. (author)

  20. Radiation protection at the RA Reactor in 1986, Part -2, Annex 2a, Radioactivity control of the RA reactor environment (atmospheric precipitations, dust, water, soil, plants, fruit...); Deo 2 - Prilog 2a - Kontrola radioaktivnosti okoline nuklearnog reaktora RA (padavine i slobodno natalozena prasina, vode, zemljiste, rastinje, voce...)

    Energy Technology Data Exchange (ETDEWEB)

    Ajdacic, N; Martic, M; Jovanovic, J [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1986-12-01

    Control of radioactivity in the biosphere in the vicinity of the RA reactor is part of the radioactivity control done regularly for the whole territory of the Vinca institute (report by the same authors included in this Annex). During 1986 control was conducted according to the plan until May 1, 1986 when a dramatic increase of the precipitations and all other samples from the biosphere was recorded. According to the measured data no significant changes have been found in the surroundings of the RA reactor, until April 29 1986. Since then more detailed control was conducted, the number of samples was increased, apart from standard measuring procedure of total beta activity measurements, gamma spectrometry of all samples was applied. High activity level of the following nuclides was found: Iodine, cerium,cesium, tellurium, ruthenium, barium, lanthanum, etc. As an example activity of ?1?3?1 I in one sample was 564{+-}5 kBq/m{sup 2}. [Serbo-Croat] Kontrola radioaktivnosti biosfere u okolini reaktora RA je deo kontrole radioaktivnosti koja se redovno vrsi za celokupnu teritoriju Instituta Vinca (izvestaj istih autora ukljucen je u ovaj Prilog). Tokom 1986. kontrola je ostvarivana prema planu do 1. maja 1986, kada je registrovano drasticano povecanje aktivnosti padavina i ostalih uzoraka biosfere. Prema rezultatima merenja, nisu registrovana znacajnija odstupanja u okolini reaktora RA sve do 29. aprila 1986. Od tada se vrse detaljnija merenja, broj uzoraka je uvecan, pored standardno primenjivane metode primenom merenja totalne beta aktivnosti uzoraka, svi uzorci su analizirani gama spektrometrijski. Enormno visoka kontaminacija uzoraka posle gamma spektrometrije pokazala je prisustvo aktivacionih i fisionih radionuklida medju kojima su bili: jod, cerijum, cesijum, rutenijum, barium lantan i drugi. Tako je na primer samo aktivnost I-133 iznosila 564{+-}5 kBq/m{sup 2}.

  1. Analysis of neutron flux increase in the horizontal experimental channels of Ra reactor - masters thesis

    International Nuclear Information System (INIS)

    Strugar, P.

    1964-12-01

    Calculation and experimental results shown in this paper show that higher thermal neutron flux is obtained in the reactor core with central horizontal reflector at the same power level. The flux is increased when the moderation capability of the core is decreased. Apart from increase of the thermal component of the neutron flux in the experimental channels, the central reflector causes decrease of the epithermal neutron flux and gamma radiation intensity. This is very useful for studying (n, γ) reaction, neutron diffraction, etc. [sr

  2. Euratom contributions in Fast Reactor research programmes

    International Nuclear Information System (INIS)

    Fanghänel, Th.; Somers, J.

    2013-01-01

    The Sustainable Nuclear Initiative: • demonstrate long-term sustainability of nuclear energy; • demonstration reactors of Gen IV: •more efficient use of resources; • closed fuel cycle; • reduced proliferation risks; • enhanced safety features. • Systems pursued in Europe: • Sodium-cooled fast reactor SFR; • Lead-cooled fast reactor LFR; • Gas-cooled fast reactor GFR. Sustainable Nuclear Energy Technology Platform SNE-TP promotes research, development and demonstration of the nuclear fission technologies necessary to achieve the SET-Plan goals

  3. Experience about performance of experimental facility VISA-2 for materials irradiation by the fast neutron flux at the RA reactor in Vinca; Iskustvo u radu eksperimentalnih uredjaja VISA-2 za ozracivanje materijala u fluksu brzih neutron na reaktoru RA u Vinci

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institut za nuklearne nauke Boris Kidric, Vinca, Beograd (Yugoslavia)

    1964-07-01

    VISA-2 is an experimental device placed in the core of the RA reactor cooled by heavy water. The objective of constructing this device was irradiation of non-fissile samples of reactor materials in order to test radiation damage. Since the first irradiation program performed in 1962 a number of long-term irradiations were done successfully. This proved the device to be useful and showed new possibilities for RA reactor application. The irradiation programs were performed in cooperation with CEA- Saclay.

  4. Research reactor spent fuel in Ukraine

    International Nuclear Information System (INIS)

    Trofimenko, A.P.

    1996-01-01

    This paper describes the research reactors in Ukraine, their spent fuel facilities and spent fuel management problems. Nuclear sciences, technology and industry are highly developed in Ukraine. There are 5 NPPs in the country with 14 operating reactors which have total power capacity of 12,800 MW

  5. Operation and utilization of Indonesia Research Reactors

    International Nuclear Information System (INIS)

    Kuntoro, Iman; Sujalmo, Saiful; Tarigan, Alim

    2004-01-01

    For supporting the R and D in nuclear science and technology and its application, BATAN own and operate three research reactors namely, TRIGA-2000, KARTINI and RSG-GAS having thermal power of 2 MW, 100 kW and 30 MW respectively. The main features, operation and utilization progress of the reactors are described in this report. (author)

  6. Utilization of the SLOWPOKE-2 research reactor

    International Nuclear Information System (INIS)

    Lalor, G.C.

    2001-01-01

    SLOWPOKEs are typically low power research reactors that have a limited number of applications. However, a significant range of NAA can be performed with such reactors. This paper describes a SLOWPOKE-based NAA program that is performing a valuable series of studies in Jamaica, including geological mapping and pollution assessment. (author)

  7. MIT research reactor. Power uprate and utilization

    Energy Technology Data Exchange (ETDEWEB)

    Hu, Lin-Wen [Nuclear Reactor Laboratory, Massachusetts Inst. of Technology, Cambridge, MA (United States)

    2012-03-15

    The MIT Research Reactor (MITR) is a university research reactor located on MIT campus. and has a long history in supporting research and education. Recent accomplishments include a 20% power rate to 6 MW and expanding advanced materials fuel testing program. Another important ongoing initiative is the conversion to high density low enrichment uranium (LEU) monolithic U-Mo fuel, which will consist of a new fuel element design and power increase to 7 MW. (author)

  8. Research reactor utilization in chemistry programmes

    International Nuclear Information System (INIS)

    Bautista, E.

    1983-01-01

    The establishment and roles of the Philippines Atomic Energy Commission in promoting and regulating the use of atomic energy are explained. The research reactor, PRR-1 is being converted to TRIGA to meet the increasing demands of high-flux. The activities of PAEC in chemistry research programs utilizing reactor are discussed in detail. The current and future plans of Research and Development programs are also included. (A.J.)

  9. Radiation protection at the RA reactor in 1987, Part I: Control of the working environment - dosimetry and radiation protection at the RA reactor, Annex 1; Prilog 1, Zastita od zracenja kod reaktora RA u 1987. godini - Deo 1: Kontrola radne sredine - poslovi dozimetrije i tehnicke zastite od zracenja kod reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M; Bjelanovic, J; Minincic, Z; Komatina, R; Raicevic, J [Institute of Nuclear Sciences Boris Kidric, Vinca, Laboratory for radiation and environmental proetecion, Beograd (Serbia and Montenegro)

    1987-12-15

    This report contains data and analysis of the of measured sample results collected during radiation protection control in the working environment of the RA reactor. First part contains basic exposure values and statistical review of the the total number of radiation measurements. It includes contents of radioactive gasses and effluents in the air, as well as the level of surface contamination of clothes and uncovered parts of the personnel bodies. Second part deals with the analysis of personnel doses. It was found that the maximum individual dose from external irradiation amounted was less than 6.0 mSv during past 10 months. Individual exposures for 9/10 of the personnel were less than 1/10 of the annual permissible exposure. Data are compared to radiation doses for last year and previous five years. Third part of this annex contains basic data about the quantity of collected radioactive waste, total quantity of contaminated and decontaminated surfaces. During 1987 there have been no accidents that could cause significant contamination of working surfaces and components nor radiation exposure of the personnel. [Serbo-Croat] U ovom izvestaju prikazani su analizirani reprezentativni rezultati sakupljeni u okviru kontrole radne sredine i tehnicke zastite od zracenja reaktora RA. U prvom delu izvestaja izlozeni su podaci o osnovnim vidovima izlaganja zracenju i statisticki pregled ukupnog broja radiacionih merenja. Dati su takodje rezultati merenja sadrzaja radioktivnih gasova i aerosola u vazduhu, kao i stepena kontaminacije povrsina, odece i otkrivenih delova tela osoblja. U drugom delu izvestaja izlozeni su rezultati analize ozracivanja radnog osoblja. Utvrdjeno je da je maksimalna individualna doza spoljasnjeg izlaganja u proteklih 10 meseci bila 6,0 mSv, a da su pojadinacna izlaganja vise od 9/10 radnog osoblja bila manja od 1/10 godisnje granicne vrednosti. Dati su takodje uporedni podaci o ozracivanju osoblja u prethodnoj, kao i u pet proteklih godina, iz kojih

  10. Safety of Research Reactors. Safety Requirements

    International Nuclear Information System (INIS)

    2010-01-01

    The main objective of this Safety Requirements publication is to provide a basis for safety and a basis for safety assessment for all stages in the lifetime of a research reactor. Another objective is to establish requirements on aspects relating to regulatory control, the management of safety, site evaluation, design, operation and decommissioning. Technical and administrative requirements for the safety of research reactors are established in accordance with these objectives. This Safety Requirements publication is intended for use by organizations engaged in the site evaluation, design, manufacturing, construction, operation and decommissioning of research reactors as well as by regulatory bodies

  11. Effective utilization and management of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Muranaka, R [International Atomic Energy Agency, Vienna (Austria). Div. of Research and Isotopes

    1984-06-01

    The problem of utilizing a research reactor effectively is closely related to its management and therefore should not be considered separately. Too often, attention has been focused on specific techniques and methods rather than on the overall programme of utilization, with the result that skills and equipment have been acquired without any active continuing programme of applications and services. The seminar reported here provided a forum for reactor managers, users, and operators to discuss their experience. At the invitation of the Government of Malaysia, it was held at the Asia Pacific Development Centre, Kuala Lumpur, from 7 to 11 November 1983. It was attended by about 50 participants from 19 Member States; it is hoped that a report on the seminar, including papers presented, can be published and thus reach a wider audience. Thirty-one lectures and contributions were presented at a total of seven sessions: Research reactor management; Radiation exposure and safety; Research reactor utilization (two sessions); PUSPATI Research Reactor Project Development; Core conversion to low-enriched uranium, and safeguards; Research reactor technology. In addition, a panel discussed the causes and resolutions of the under-utilization of research reactors.

  12. Effective utilization and management of research reactors

    International Nuclear Information System (INIS)

    Muranaka, R.

    1984-01-01

    The problem of utilizing a research reactor effectively is closely related to its management and therefore should not be considered separately. Too often, attention has been focused on specific techniques and methods rather than on the overall programme of utilization, with the result that skills and equipment have been acquired without any active continuing programme of applications and services. The seminar reported here provided a forum for reactor managers, users, and operators to discuss their experience. At the invitation of the Government of Malaysia, it was held at the Asia Pacific Development Centre, Kuala Lumpur, from 7 to 11 November 1983. It was attended by about 50 participants from 19 Member States; it is hoped that a report on the seminar, including papers presented, can be published and thus reach a wider audience. Thirty-one lectures and contributions were presented at a total of seven sessions: Research reactor management; Radiation exposure and safety; Research reactor utilization (two sessions); PUSPATI Research Reactor Project Development; Core conversion to low-enriched uranium, and safeguards; Research reactor technology. In addition, a panel discussed the causes and resolutions of the under-utilization of research reactors

  13. The United States Advanced Reactor Technologies Research and Development Program

    International Nuclear Information System (INIS)

    O’Connor, Thomas J.

    2014-01-01

    The following aspects are addressed: • Nuclear energy mission; • Reactor research development and deployment (RD&D) programs: - Light Water Reactor Sustainability Program; - Small Modular Reactor Licensing Technical Support; - Advanced Reactor Technologies (ART)

  14. The first university research reactor in India

    International Nuclear Information System (INIS)

    Murty, G.S.

    1999-01-01

    As the first university research reactor in India, the low power, pool type with fixed core and low enriched uranium fuel research reactor is under construction in the Andhra university campus, Andhra Pradesh, India. The reactor is expected to be commissioned during 2001-2002. The mission of the reactor is to play the research center as a regional research facility catering to the needs of academic institutions and industrial organizations of this region of the country. Further, to encourage interdisplinary and multidisplinary research activities, to supply radioisotope and labelled compounds to the user institutions and to create awareness towards the peaceful uses of atomic energy. This report describes its objectives, status and future plans in brief. (H. Itami)

  15. The first university research reactor in India

    Energy Technology Data Exchange (ETDEWEB)

    Murty, G.S. [Co-ordinator, Low Power Research Reactor, Andhra Univ., Visakapatnam (India)

    1999-08-01

    As the first university research reactor in India, the low power, pool type with fixed core and low enriched uranium fuel research reactor is under construction in the Andhra university campus, Andhra Pradesh, India. The reactor is expected to be commissioned during 2001-2002. The mission of the reactor is to play the research center as a regional research facility catering to the needs of academic institutions and industrial organizations of this region of the country. Further, to encourage interdisplinary and multidisplinary research activities, to supply radioisotope and labelled compounds to the user institutions and to create awareness towards the peaceful uses of atomic energy. This report describes its objectives, status and future plans in brief. (H. Itami)

  16. Conceptual design of multipurpose compact research reactor

    International Nuclear Information System (INIS)

    Nagata, Hiroshi; Kusunoki, Tsuyoshi; Hori, Naohiko; Kaminaga, Masanori

    2012-01-01

    Conceptual design of the high-performance and low-cost multipurpose compact research reactor which will be expected to construct in the nuclear power plant introduction countries, started from 2010 in JAEA and nuclear-related companies in Japan. The aims of this conceptual design are to achieve highly safe reactor, economical design, high availability factor and advanced irradiation utilization. One of the basic reactor concept was determined as swimming pool type, thermal power of 10MW and water cooled and moderated reactor with plate type fuel element same as the JMTR. It is expected that the research reactors are used for human resource development, progress of the science and technology, expansion of industry use, lifetime extension of LWRs and so on. (author)

  17. Decommissioning of the Neuherberg Research Reactor (FRN)

    International Nuclear Information System (INIS)

    Demmeler, M.; Rau, G.; Strube, D.

    1982-01-01

    The Neuherberg Research Reactor is of type TRIGA MARK III with 1 MW steady state power and pulsable up to 2000 MW. During more than ten years of operation 12000 MWh and 6000 reactor pulses had been performed. In spite of its good technical condition and of permanent safe operation without any failures, the decommissioning of the Neuherberg research reactor was decided by the GSF board of directors to save costs for maintaining and personnel. As the mode of decommissioning the safe enclosure was chosen which means that the fuel elements will be transferred back to the USA. All other radioactive reactor components will be enclosed in the reactor block. Procedures for licensing of the decommissioning, dismantling procedures and time tables are presented

  18. Technical specifications: Health Physics Research Reactor

    International Nuclear Information System (INIS)

    1986-03-01

    These technical specifications define the key limitations that must be observed for safe operation of the Health Physics Research Reactor (HPRR) and an envelope of operation within which there is assurance that these limits will not be exceeded

  19. Cost estimation for decommissioning of research reactors

    International Nuclear Information System (INIS)

    Grossi, Pablo Andrade; Tello, Cledola Cassia Oliveira de; Segabinaze, Roberto de Oliveira; Daniska, Vladimir

    2013-01-01

    In the case of research reactors, the limited data that is available tends to provide only overall decommissioning costs, without any breakdown of the main cost elements. In order to address this subject, it is important to collect and analyse all available data of decommissioning costs for the research reactors. The IAEA has started the DACCORD Project focused on data analysis and costing of research reactors decommissioning. Data collection is organized in accordance with the International Structure for Decommissioning Costing (ISDC), developed jointly by the IAEA, the OECD Nuclear Energy Agency and the European Commission. The specific aims of the project include the development of representative and comparative data and datasets for preliminary costing for decommissioning. This paper will focus on presenting a technique to consider several representative input data in accordance with the ISDC structure and using the CERREX (Cost Estimation for Research Reactors in Excel) software developed by IAEA. (author)

  20. IRSN research programs concerning reactor safety

    International Nuclear Information System (INIS)

    Bardelay, J.

    2005-01-01

    This paper is made up of 3 parts. The first part briefly presents the missions of IRSN (French research institute on nuclear safety), the second part reviews the research works currently led by IRSN in the following fields : -) the assessment of safety computer codes, -) thermohydraulics, -) reactor ageing, -) reactivity accidents, -) loss of coolant, -) reactor pool dewatering, -) core meltdown, -) vapor explosion, and -) fission product release. In the third part, IRSN is shown to give a major importance to experimental programs led on research or test reactors for collecting valid data because of the complexity of the physical processes that are involved. IRSN plans to develop a research program concerning the safety of high or very high temperature reactors. (A.C.)